# Idacorp Inc: Form 10-Q for the period ended Sep 30, 2023

- Company: [Idacorp Inc](/companies/ida.md) (CIK 1057877)
- Form: 10-Q
- Filed: 2023-11-02
- Accepted by EDGAR: Nov 2, 2023, 08:09 ET
- Period: 2023-09-30
- Accession: 0001057877-23-000059
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1057877/000105787723000059/ida-20230930.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1057877/000105787723000059/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2023-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2023-07-01 to 2023-09-30 | $496.6m | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Revenue | 9 months, 2023-01-01 to 2023-09-30 | $1.27bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Operating income | 3 months, 2023-07-01 to 2023-09-30 | $126.3m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2023-01-01 to 2023-09-30 | $276.7m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2023-07-01 to 2023-09-30 | $13.8m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2023-01-01 to 2023-09-30 | $29.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2023-07-01 to 2023-09-30 | $105.3m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2023-01-01 to 2023-09-30 | $229.9m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2023-07-01 to 2023-09-30 | $2.07 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2023-01-01 to 2023-09-30 | $4.53 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2023-07-01 to 2023-09-30 | $2.08 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2023-01-01 to 2023-09-30 | $4.53 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2023-07-01 to 2023-09-30 | 50,805,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2023-01-01 to 2023-09-30 | 50,762,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2023-01-01 to 2023-09-30 | $162.0m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 9 months, 2023-01-01 to 2023-09-30 | $427.2m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 9 months, 2023-01-01 to 2023-09-30 | $120.6m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2023-09-30 | $445.5m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2023-09-30 | $1.04bn | us-gaap:AssetsCurrent |
| Total assets | at 2023-09-30 | $8.29bn | us-gaap:Assets |
| Current liabilities | at 2023-09-30 | $488.9m | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2023-09-30 | $2.83bn | us-gaap:LongTermDebtNoncurrent |
| Shareholders' equity | at 2023-09-30 | $2.92bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 131,100 characters.

### AND RESULTS OF OPERATIONS

In MD&A in this report, the general financial condition and results of operations for IDACORP, Inc. and its subsidiaries (collectively, IDACORP) and Idaho Power Company and its subsidiary (collectively, Idaho Power) are discussed. While reading the MD&A, please refer to the accompanying condensed consolidated financial statements of IDACORP and Idaho Power. Also refer to "Cautionary Note Regarding Forward-Looking Statements" in this report for important information regarding forward-looking statements made in this MD&A and elsewhere in this report. This discussion updates the MD&A included in the 2022 Annual Report, and should also be read in conjunction with the information in that report. The results of operations for an interim period generally will not be indicative of results for the full year, particularly in light of the seasonality of Idaho Power's sales volumes, as discussed below.

### INTRODUCTION

IDACORP is a holding company formed in 1998 whose principal operating subsidiary is Idaho Power. IDACORP’s common stock is listed and trades on the New York Stock Exchange under the trading symbol "IDA". Idaho Power is an electric utility whose rates and other matters are regulated by the IPUC, OPUC, and FERC. Idaho Power generates revenues and cash flows primarily from the sale and distribution of electricity to customers in its Idaho and Oregon service areas, as well as from the wholesale sale and transmission of electricity. Idaho Power experiences its highest retail energy sales during the summer irrigation and cooling season, with a lower peak in the winter that generally results from heating demand.

Idaho Power is the parent of IERCo, a joint venturer in BCC, which mines and supplies coal to the Jim Bridger plant owned in part by Idaho Power. IDACORP’s other notable subsidiaries include IFS, an investor in affordable housing and other real estate tax credit investments, and Ida-West, an operator of small hydropower generation projects that satisfy the requirements of the PURPA.

### EXECUTIVE OVERVIEW

### Management's Outlook and Company Objectives

In the 2022 Annual Report, IDACORP's and Idaho Power's management included a summary of their business objectives for the companies for 2023 and beyond, under the heading "Executive Overview" in the MD&A. As of the date of this report, management's outlook and strategy remain consistent with that discussion, as updated by some of the discussion in this MD&A. Developments that have occurred since that report include the following:

- Idaho Power continues to focus on timely recovery of costs and earning a reasonable return on investment. On October 27, 2023, Idaho Power, the Staff of the IPUC, and intervening parties publicly filed a settlement stipulation (2023 General Rate Case Settlement Stipulation) with the IPUC related to the Idaho general rate case that Idaho Power had filed on June 1, 2023. The 2023 General Rate Case Settlement Stipulation is subject to approval by the IPUC. The general rate case filing and 2023 General Rate Case Settlement Stipulation are described more fully in Note 3 - "Regulatory Matters" to the condensed consolidated financial statements included in this report.
- In September 2023, Idaho Power filed its 2023 IRP with the IPUC and OPUC. The 2023 IRP preferred resource portfolio plans for a significant increase in energy and capacity resources over the next 20 years to meet growing demand, primarily solar, wind, and battery resource additions. In addition, the preferred resource portfolio includes conversions of multiple jointly-owned coal-fired generation units to natural gas-fired generation units. To support the resource additions, the preferred portfolio also includes the Boardman-to-Hemingway transmission line with an in-service date as early as 2026 and three Gateway West transmission line segments phased in with in-service dates from 2028 through 2040.
- In September 2023, IDACORP's board of directors approved a 5.1 percent increase in the regular quarterly cash dividend on IDACORP’s common stock from $0.79 per share to $0.83 per share, as a part of a 177 percent increase in quarterly dividends approved over the last twelve years.
- In March 2023, Idaho Power executed an agreement with the BPA to transfer BPA's 24 percent interest in the Boardman-to-Hemingway 500-kV transmission line project to Idaho Power, bringing Idaho Power's interest in the project to 45 percent. Further, in March 2023 the Oregon Supreme Court affirmed the Energy Facility Siting Council's (EFSC) order granting a site certificate for the Boardman-to-Hemingway transmission line project. In June 2023, both the IPUC and OPUC granted CPCNs related to the construction of the Boardman-to-Hemingway transmission line.
- In April and May 2023, the IPUC approved Idaho Power's applications for revised special contracts for electric service between Idaho Power and two large industrial customers, which were modeled after Idaho Power's Clean Energy Your Way program for the procurement of renewable energy for customers.
- In April 2023, the IPUC approved Idaho Power's 20-year power purchase agreement with Pleasant Valley Solar, LLC to purchase the output from a planned 200 MW solar facility, with a scheduled in-service date of March 2025. Idaho Power plans to sell that output exclusively to a large industrial customer under an agreement modeled after Idaho Power's Clean Energy Your Way program.
- Also in April 2023, Idaho Power entered into a 20-year agreement to utilize the storage capacity from a 150-MW battery storage facility scheduled to be online in June 2025. Idaho Power intends for this capacity to supplement over 200 MW of company-owned storage that it expects to be online in 2023 and 2024, and an additional 77 MW of company-owned storage it anticipates adding in 2025, pending regulatory approval. In July 2023, 80 MW of company-owned battery storage came online.
- Idaho Power issued a formal RFP in April 2023, soliciting bids for new energy and capacity resources as well as energy that can be delivered via transmission, beginning in 2026. At the time of the RFP issuance, Idaho Power’s long-range planning process had identified a potential need in 2026 and 2027 of approximately 350 MW of peak capacity, which could be met by approximately 1,100 MW of variable energy resources. RFP procurement decisions will be based on the most up-to-date energy and capacity need information. The RFP provides that a portion of these resources may be transmitted via the Boardman-to-Hemingway transmission line project, which Idaho Power plans to have in-service as early as 2026.

### Summary of Financial Results

The following is a summary of Idaho Power's net income, net income attributable to IDACORP, and IDACORP's earnings per diluted share for the three and nine months ended September 30, 2023 and 2022 (in thousands, except earnings per share amounts):

|  | Three months ended September 30, 2023 | 2022 | Nine months ended September 30, 2023 | 2022 |
| --- | ---: | ---: | ---: | ---: |
| Idaho Power net income | $103,022 | $104,532 | $225,812 | $213,181 |
| Net income attributable to IDACORP, Inc. | $105,264 | $106,380 | $229,936 | $216,928 |
| Weighted average outstanding shares – diluted | 50,805 | 50,722 | 50,762 | 50,689 |
| IDACORP, Inc. earnings per diluted share | $2.07 | $2.10 | $4.53 | $4.28 |

38

The table below provides a reconciliation of net income attributable to IDACORP for the three and nine months ended September 30, 2023, from the same periods in 2022 (items are in millions and are before related income tax impact unless otherwise noted):

|  | Three months ended |  | Nine months ended |  |
| --- | ---: | ---: | ---: | ---: |
| **Net income attributable to IDACORP, Inc. - September 30, 2022** |  | **$106.4** |  | **$216.9** |
| Increase (decrease) in Idaho Power net income: |  |  |  |  |
| Customer growth, net of associated power supply costs and power cost adjustment mechanisms | 4.6 |  | 11.4 |  |
| Usage per retail customer, net of associated power supply costs and power cost adjustment mechanisms | (17.2) |  | (18.1) |  |
| Idaho FCA revenues | 7.2 |  | 6.2 |  |
| Retail revenues per MWh, net of associated power supply costs and power cost adjustment mechanisms | 0.9 |  | 11.0 |  |
| Transmission wheeling-related revenues | (2.8) |  | 4.0 |  |
| Other O&M expenses | 4.9 |  | 8.3 |  |
| Depreciation expense | (4.9) |  | (18.1) |  |
| Other changes in operating revenues and expenses, net | 5.3 |  | 1.7 |  |
| (Decrease) Increase in Idaho Power operating income | (2.0) |  | 6.4 |  |
| Non-operating expense, net | (0.5) |  | 5.1 |  |
| Additional ADITC amortization | — |  | 7.5 |  |
| Income tax expense, excluding additional ADITC amortization | 1.0 |  | (6.4) |  |
| Total (decrease) increase in Idaho Power net income |  | (1.5) |  | 12.6 |
| Other IDACORP changes (net of tax) |  | 0.4 |  | 0.4 |
| **Net income attributable to IDACORP, Inc. - September 30, 2023** |  | **$105.3** |  | **$229.9** |

### Net Income - Third Quarter 2023

IDACORP's net income decreased $1.1 million for the third quarter of 2023 compared with the third quarter of 2022, due primarily to lower net income at Idaho Power. At Idaho Power, customer growth increased operating income by $4.6 million in the third quarter of 2023 compared with the third quarter of 2022, as the number of Idaho Power customers grew by approximately 14,000, or 2.3 percent, during the twelve months ended September 30, 2023. Usage per customer decreased operating income by $17.2 million in the third quarter of 2023 compared with the third quarter of 2022. Greater precipitation and more moderate temperatures in Idaho Power's service area led agricultural irrigation customers to use less energy per customer to operate irrigation pumps and residential and commercial customers to use less energy per customer for cooling purposes in the third quarter of 2023 compared with the third quarter of 2022. The revenue impact of the decrease in sales volumes per customer was partially offset by the FCA mechanism (applicable to residential and small commercial customers), which increased revenues in the third quarter of 2023 by $7.2 million compared with the third quarter of 2022.

Transmission wheeling-related revenues decreased $2.8 million during the third quarter of 2023 compared with the third quarter of 2022, resulting primarily from lower wheeling volumes as energy prices in the western United States were less volatile, reducing transmission system demand and revenues.

Total other O&M expenses in the third quarter of 2023 were $4.9 million lower than in the third quarter of 2022, due primarily to lower maintenance expenses at hydropower facilities and jointly-owned coal plants as a result of fewer planned maintenance projects, as well as the timing of regulatory deferrals.

Depreciation expense increased $4.9 million in the third quarter of 2023 compared with the third quarter of 2022, due primarily to an increase in plant-in-service.

Other changes in operating revenues and expenses, net, increased operating income by $5.3 million in the third quarter of 2023 compared with the third quarter of 2022, due primarily to lower property taxes and a decrease in net power supply expenses that were not deferred for future recovery in rates through Idaho Power's power cost adjustment mechanisms. Lower wholesale power purchase volumes and prices decreased Idaho Power's net power supply expenses in the third quarter of 2023 compared with the third quarter of 2022.

Non-operating expense, net, increased $0.5 million in the third quarter of 2023 compared with the third quarter of 2022. Higher interest expense on long-term debt and other liabilities in the third quarter of 2023 compared with the third quarter of 2022 was mostly offset by an increase in AFUDC and higher interest income due to higher interest rates and higher average cash and cash equivalents balances.

### Net Income - Year-To-Date 2023

IDACORP's net income increased $13.0 million for the first nine months of 2023 compared with the first nine months of 2022, due primarily to higher net income at Idaho Power. At Idaho Power, customer growth increased operating income by $11.4 million for the first nine months of 2023 compared with the first nine months of 2022. Usage per customer decreased operating income by $18.1 million during the first nine months of 2023 compared with the first nine months of 2022, due primarily to the lower usage per customer in the third quarter of 2023 described above. The revenue impact of the decrease in sales volumes per customer was partially offset by the FCA mechanism (applicable to residential and small commercial customers), which increased revenues in the first nine months of 2023 by $6.2 million compared with the first nine months of 2022.

The net increase in retail revenues per MWh, net of associated power supply costs and power cost adjustment mechanisms, increased operating income by $11.0 million in the first nine months of 2023 compared with the first nine months of 2022. The net increase in retail revenues per MWh was primarily due to the June 1, 2022, rate increase for Idaho Power’s Idaho retail customers related to an order from the IPUC that authorized Idaho Power to accelerate the depreciation on and recover through 2030 the net book value of coal-related assets at Idaho Power's jointly-owned Jim Bridger plant, as of December 31, 2020, plus forecasted plant investments (Bridger Order).

Transmission wheeling-related revenues increased $4.0 million during the first nine months of 2023 compared with the first nine months of 2022, resulting from Idaho Power's OATT rates being 1 percent higher and due to elevated energy prices in the western United States in the first quarter of 2023 compared with the first quarter of 2022.

Total other O&M expenses in the first nine months of 2023 were $8.3 million lower than the first nine months of 2022, due primarily to lower expenses from scheduled cyclical plant maintenance projects compared with the same period in 2022, as well as the timing of regulatory deferrals and payment credits received related to a jointly-funded infrastructure project. These decreases in other O&M expenses were offset partially by inflationary pressures on labor-related costs.

Depreciation expense increased $18.1 million due primarily to the impacts of the Bridger Order. The Bridger Order resulted in Idaho Power recording the deferral of certain depreciation expense in the second quarter of 2022. In addition, the increase was partially due to an increase in plant-in-service.

Non-operating expense, net, decreased $5.1 million in the first nine months of 2023 compared with the first nine months of 2022. AFUDC increased as the average construction work in progress balance was higher throughout the first nine months of 2023 compared with the first nine months of 2022. Also, interest and investment income increased due to higher interest rates and higher average cash and cash equivalents balances. These increases were partially offset by higher interest expense on long-term debt and other liabilities in the first nine months of 2023 compared with the first nine months of 2022.

Income tax expense in the first nine months of 2023 decreased $1.1 million compared with the first nine months of 2022, as increased taxes from higher pre-tax income was more than offset by additional ADITC amortization. Based on Idaho Power's current expectations of full-year 2023 results, Idaho Power recorded $7.5 million of additional ADITC amortization under its existing Idaho regulatory settlement stipulation during the first nine months of 2023. Idaho Power currently expects to amortize up to $10 million of additional ADITC for the full-year 2023, but did not record any additional ADITC amortization in 2022.

### Overview of General Factors and Trends Affecting Results of Operations and Financial Condition

IDACORP's and Idaho Power's results of operations and financial condition are affected by a number of factors, and the impact of those factors is discussed in more detail below in this MD&A. To provide context for the discussion elsewhere in this report, some of the more notable factors are as follows:

- ***Economic Conditions and Loads***: Economic conditions impact consumer demand for energy, revenues, collectability of accounts, the volume of wholesale energy sales, and the need to construct and improve infrastructure, purchase power, and implement programs to meet customer load demands. In recent years, Idaho Power has seen significant growth in the number of customers in its service area. Over the twelve months ended September 30, 2023, Idaho Power's customer count grew by 2.3 percent. While recessionary or volatile economic conditions could slow the rate of

customer growth in the near-term, Idaho Power expects its number of customers and, to a greater extent its load due to anticipated commercial and industrial customer growth, to increase in the foreseeable future.

Idaho Power filed its 2023 IRP, its 20-year forecast of power demand and supply options, with the IPUC and OPUC in September 2023. The 2023 IRP assumptions include significant large commercial and industrial additions in the 5-year forecasted annual growth rate, including from new facilities under development by Meta Platforms, Inc. and Micron Technology, Inc. (Micron). Included in the below table are Idaho Power's load forecast assumptions used in the 2023 IRP, and for comparison purposes, the analogous average annual growth rates Idaho Power used in the prior two IRPs.

|  | 5-Year Forecasted Annual Growth Rate Retail Sales (Billed MWh) | Annual Peak (Peak Demand) | 20-Year Forecasted Annual Growth Rate Retail Sales (Billed MWh) | Annual Peak (Peak Demand) |
| --- | ---: | ---: | ---: | ---: |
| 2023 IRP | 5.5% | 3.7% | 2.1% | 1.8% |
| 2021 IRP | 2.6% | 2.1% | 1.4% | 1.4% |
| 2019 IRP | 1.3% | 1.4% | 1.0% | 1.2% |

Idaho Power believes that existing and sustained growth in customers, load, and peak demand for electricity, along with changes in the regional transmission markets that have constrained the availability of transmission outside Idaho Power’s service area to import energy during peak load periods, require Idaho Power to increase its investment in capacity resources, transmission, and distribution infrastructure. This includes the Boardman-to-Hemingway and Gateway West transmission projects, along with other capacity and energy resources contemplated by the procurement of resources described in the "Rate Base Growth and Infrastructure Investment" section below in this MD&A.

- ***Rate Base Growth and Infrastructure Investment:*** The rates established by the IPUC, OPUC, and FERC are determined with the intent to provide an opportunity for Idaho Power to recover authorized operating expenses and depreciation and earn a reasonable return on “rate base.” Rate base is generally determined by reference to the original cost (net of accumulated depreciation) of utility plant in service and certain other assets, subject to various adjustments for deferred income taxes and other items. Over time, rate base is increased by additions to utility plant in service and reduced by depreciation of utility plant and write-offs as authorized by the IPUC and OPUC. Idaho Power is pursuing significant enhancements to its utility infrastructure in an effort to maintain system reliability, ensure an adequate supply of electricity, and provide service to new customers, including major ongoing transmission projects such as the Boardman-to-Hemingway and Gateway West projects. Idaho Power's existing hydropower and thermal generation facilities also require continuing upgrades and equipment replacement, and Idaho Power is undertaking a significant relicensing effort for the HCC, its largest hydropower generation resource. Idaho Power intends to pursue timely inclusion of any significant completed capital projects into rate base as part of a future general rate case or other appropriate regulatory proceeding.

As noted previously, Idaho Power believes that existing and sustained growth in customers, load, and peak demand for electricity, along with transmission constraints, has created the need for Idaho Power to acquire significant generation and storage resources to meet energy and capacity needs over the next several years. Idaho Power expects its capital expenditures on infrastructure investments in the next five years or more will be considerable as it works to address projected energy and capacity deficits. For more information about forecasted capital expenditures and expected rate base growth, see the "Liquidity and Capital Resources" section of this MD&A.

- ***Regulation of Rates and Cost Recovery; General Rate Case Filing and Existing Settlement Stipulation:*** The prices that Idaho Power is authorized to charge for its electric and transmission service are a critical factor in determining IDACORP's and Idaho Power's results of operations and financial condition. Those rates are established by state regulatory commissions and the FERC and are intended to allow Idaho Power an opportunity to recover its expenses and earn a reasonable return on investment. Idaho Power focuses on timely recovery of its costs through filings with its regulators, working to put in place innovative regulatory mechanisms, and prudent management of expenses and investments. Idaho Power has an existing regulatory settlement stipulation in Idaho that includes provisions for the accelerated amortization of ADITC to help achieve a minimum 9.4 percent Idaho ROE. The settlement stipulation also provides for the potential sharing between Idaho Power and its Idaho customers of Idaho-jurisdictional earnings in excess of a 10.0 percent Idaho ROE, which would adjust to the authorized return on equity determined in a general rate case. The settlement stipulation has no expiration date but the minimum Idaho ROE would revert back to 95 percent of the authorized return on equity determined in an Idaho general rate case. The specific terms of the settlement

stipulation, as currently in effect, are described in Note 3 - "Regulatory Matters" to the consolidated financial statements included in the 2022 Annual Report.

On June 1, 2023, Idaho Power filed a general rate case application with the IPUC, requesting an average increase in net rates of 8.61 percent in Idaho, effective January 1, 2024. Several factors impacted Idaho Power’s need to file its Idaho general rate case including the increase in depreciation expense from rate base-eligible assets as they are placed into service, the significant amounts of capital expenditures Idaho Power has made since its last general rate case filed in 2011, the expected financing costs for capital expenditures in a higher interest-rate environment, and, to a lesser extent, the inflationary pressures on other O&M expenses described above. On October 27, 2023, Idaho Power, the Staff of the IPUC, and intervening parties publicly filed the 2023 General Rate Case Settlement Stipulation with the IPUC related to the Idaho general rate case filing. The 2023 General Rate Case Settlement Stipulation is subject to approval by the IPUC. The general rate case filing and the 2023 General Rate Case Settlement Stipulation are described more fully in Note 3 - "Regulatory Matters" to the condensed consolidated financial statements included in this report.

Idaho Power expects to make a general rate case filing in Oregon in December 2023 and that processing of a general rate case in Oregon would take approximately ten months.

- ***Weather Conditions:*** Weather and agricultural growing conditions have a significant impact on Idaho Power's energy sales. Relatively low and high temperatures result in greater energy use for heating and cooling, respectively. During the agricultural growing season, which in large part occurs during the second and third quarters of each year, irrigation customers use electricity to operate irrigation pumps, and weather conditions, such as a prolonged winter, can impact the timing and extent of use of those pumps. Idaho Power also has tiered rates and seasonal rates, which contribute to increased revenues during higher-load periods, most notably during the third quarter of each year when overall customer demand is highest. Much of the adverse or favorable impact of weather on sales of energy to residential and small commercial customers is mitigated through the Idaho FCA mechanism, which is described in Note 3 - "Regulatory Matters" to the condensed consolidated financial statements included in this report.

Further, as Idaho Power's hydropower facilities comprise over one-half of Idaho Power's nameplate generation capacity, precipitation levels impact the mix of Idaho Power's generation resources. When hydropower generation decreases, Idaho Power must rely on more expensive generation sources and purchased power. When favorable hydropower generating conditions exist for Idaho Power, they also may exist for other Pacific Northwest hydropower facility operators, lowering regional wholesale market prices and impacting the revenue Idaho Power receives from wholesale energy sales. Much of the adverse or favorable impact of this volatility is addressed through the Idaho and Oregon power cost adjustment mechanisms, which lessen the potential earnings benefit or detriment of volatile hydrological conditions and their impact on overall power supply costs. For 2023, Idaho Power expects generation from its hydropower resources to be in the range of 6.4 to 6.8 million MWh, compared with 5.3 million MWh of hydropower generation in 2022 and a 30-year average annual total of 7.7 million MWh.

- ***Mitigation of Impact of Fuel and Purchased Power Expense:*** In addition to hydropower generation, Idaho Power relies significantly on natural gas and coal to fuel its generation facilities and on power purchases in the wholesale markets. Fuel costs are impacted by electricity sales volumes, the terms and conditions of contracts for fuel, Idaho Power's generation capacity, the availability of hydropower generation resources, transmission capacity, energy market prices, and Idaho Power's hedging of fuel and power costs. Purchased power costs are impacted by the terms and conditions of contracts for purchased power, the rate of expansion of alternative energy generation sources such as wind or solar energy, generation resource maintenance outages, and wholesale energy market prices. The Idaho and Oregon power cost adjustment mechanisms mitigate in large part the potential adverse earnings impacts to Idaho Power of fluctuations in power supply costs. Idaho Power also has an energy risk management and hedging program designed to mitigate some, but not all, of the price risk associated with volatile and elevated power supply and fuel costs. However, collection from customers or return to customers of most of the difference between actual power supply costs compared with those included in retail rates is deferred to a subsequent period, which can affect Idaho Power’s operating cash flow and liquidity until those costs are recovered from or returned to customers.
- ***Regulatory and Environmental Compliance Costs; Coal Plant Retirements:*** Idaho Power is subject to extensive federal and state laws, policies, and regulations, as well as regulatory actions and audits by agencies and quasi-governmental agencies, including the FERC, the North American Electric Reliability Corporation, and the Western Electricity Coordinating Council. Compliance with these requirements directly influences Idaho Power's operating environment and affects Idaho Power's operating costs. Moreover, environmental laws and regulations may increase the cost of constructing new facilities, may increase the cost of operating generation plants, may require that Idaho

Power install additional pollution control devices at existing generation plants, may result in penalties for non-compliance, even where inadvertent, or may require that Idaho Power curtail or cease operating certain generation plants. Idaho Power expects to spend significant amounts on environmental compliance and controls for the foreseeable future. Due to economic factors in part associated with the costs of compliance with environmental regulation, Idaho Power accelerated the retirement date of its Valmy plant, ceasing coal-fired operations at one unit in 2019 and planning to cease its participation in coal-fired operations at the remaining unit by year-end 2025. In June 2022, the IPUC approved Idaho Power's request to allow the coal-related assets at the Jim Bridger plant to be fully depreciated and recovered by end-of-year 2030. The IPUC's Bridger Order related to Idaho Power's plan to cease its participation in coal-related operations at the Jim Bridger plant by 2028 is described more fully in Note 3 - "Regulatory Matters" to the condensed consolidated financial statements included in this report. The preferred portfolio of Idaho Power’s 2023 IRP included the conversion of all coal generation units at the Valmy plant and Jim Bridger plant to natural gas generation units. Idaho Power would likely need to file an application with the IPUC to adjust the plant retirement dates for its gas-fired operations related to any potential conversions.

- ***Water Management and Relicensing of Hydropower Projects:*** Because of Idaho Power's reliance on stream flow in the Snake River and its tributaries, Idaho Power participates in numerous proceedings and venues that may affect its water rights, seeking to preserve the long-term availability of its rights for its hydropower projects. Also, Idaho Power is involved in renewing its long-term federal licenses for the HCC, its largest hydropower generation source, and for American Falls, its second largest hydropower generation source. Given the number of parties involved, Idaho Power's relicensing costs have been and are expected to continue to be substantial. As of the date of this report, Idaho Power cannot determine the ultimate terms of, and costs associated with, any resulting long-term licenses for the HCC or American Falls hydropower facilities.
- ***Wildfire Mitigation Efforts:*** In recent years, the western United States has experienced an increasing trend in the degree of annual destruction from wildfires. A variety of factors have contributed to this trend including climate change, increased wildland-urban interfaces, historical land management practices, and overall wildland and forest health. While Idaho Power has not experienced to-date the extent of catastrophic wildfires within its service area that have occurred in California and elsewhere in the western United States, Idaho Power is taking a proactive approach to wildfire threat in its service area and transmission corridors. Idaho Power has adopted a WMP that outlines actions Idaho Power is taking or is working to implement in the future to reduce wildfire risk and to strengthen the resiliency of its transmission and distribution system to wildfires. Idaho Power's approach to achieve these objectives includes identifying areas subject to elevated risk; system hardening programs, vegetation management, and field personnel practices to mitigate wildfire risk; incorporating current and forecasted weather and field conditions into operational practices; public safety power shutoff protocols adopted in 2022; and evaluating the performance and effectiveness of the strategies identified in the WMP through metrics and monitoring. In regulatory orders received in June 2021 and March 2023, the IPUC authorized Idaho Power to defer, for future amortization, the Idaho jurisdictional share of actual incremental O&M expenses and depreciation expense of certain capital investments necessary to implement the WMP. The IPUC orders related to the WMP are described in more detail in the "Regulatory Matters" section of this MD&A. If approved by the IPUC, the 2023 General Rate Case Settlement Stipulation would allow continued deferral of incremental vegetation management and insurance costs, as measured from 2022 actual costs, through the earlier of Idaho Power’s next Idaho general rate case or 2025.

### RESULTS OF OPERATIONS

This section of MD&A takes a closer look at the significant factors that affected IDACORP’s and Idaho Power’s earnings during the three months and nine months ended September 30, 2023. In this analysis, the results for the three months and nine months ended September 30, 2023, are compared with the same periods in 2022.

The table below presents Idaho Power’s energy sales and supply (in thousands of MWh) for the three months and nine months ended September 30, 2023 and 2022.

|  | Three months ended September 30, 2023 | 2022 | Nine months ended September 30, 2023 | 2022 |
| --- | ---: | ---: | ---: | ---: |
| Retail energy sales | 4,654 | 4,897 | 12,039 | 12,170 |
| Wholesale energy sales | 171 | 182 | 697 | 320 |
| Energy sales bundled with renewable energy credits | 31 | 36 | 813 | 586 |
| **Total energy sales** | 4,856 | 5,115 | 13,549 | 13,076 |
| Hydropower generation | 1,559 | 1,354 | 5,363 | 4,219 |
| Coal generation | 844 | 1,288 | 1,452 | 2,883 |
| Natural gas and other generation | 1,035 | 844 | 2,222 | 1,482 |
| **Total system generation** | 3,438 | 3,486 | 9,037 | 8,584 |
| Purchased power | 1,798 | 1,874 | 5,541 | 5,378 |
| Line losses | (380) | (245) | (1,029) | (886) |
| **Total energy supply** | 4,856 | 5,115 | 13,549 | 13,076 |

Weather-related information for Boise, Idaho, for the three months and nine months ended September 30, 2023 and 2022, is presented in the table below. While Boise, Idaho weather conditions are not necessarily representative of weather conditions throughout Idaho Power's service area, the greater Boise area has the majority of Idaho Power's customers and is included for illustrative purposes.

|  | Three months ended September 30, 2023 | 2022 | Normal (2) | Nine months ended September 30, 2023 | 2022 | Normal (2) |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Heating degree-days(1) | 49 | 13 | 94 | 3,218 | 3,518 | 3,181 |
| Cooling degree-days(1) | 1,076 | 1,233 | 847 | 1,322 | 1,390 | 1,035 |
| Precipitation (inches) | 2.1 | 0.3 | 0.8 | 8.8 | 7.6 | 8.0 |

(1) Heating and cooling degree-days are common measures used in the utility industry to analyze the demand for electricity and indicate when a customer would use electricity for heating and cooling. A degree-day measures how much the average daily temperature varies from 65 degrees. Each degree of temperature above 65 degrees is counted as one cooling degree-day, and each degree of temperature below 65 degrees is counted as one heating degree-day.

(2) Normal heating degree-days and cooling degree-days elements are, by convention, the arithmetic mean of the elements computed over 30 consecutive years. The normal amounts are the sum of the monthly normal amounts. These normal amounts are computed by the National Oceanic and Atmospheric Administration.

***Sales Volume and Generation:*** Retail sales volumes decreased 5 percent and 1 percent in the third quarter and first nine months of 2023, respectively, compared with the same periods in 2022, primarily due to weather variations that caused lower usage per customer. Greater precipitation and more moderate temperatures in Idaho Power's service area during the third quarter of 2023 led agricultural irrigation customers to use less energy per customer to operate irrigation pumps and residential and commercial customers to use less energy per customer for cooling purposes compared with same period in 2022. The decrease in usage per customer in both periods was partially offset by customer growth, as the number of Idaho Power's customers grew by 2.3 percent over the prior twelve months. For more information on the changes in sales volume, see the "Operating Revenues" section below in this MD&A.

Total system generation decreased 1 percent in the third quarter of 2023 compared with the third quarter of 2022, due primarily to lower retail sales described above. Total system generation increased 5 percent in the first nine months of 2023 compared with the same period in 2022, as total energy sales increased 4 percent. For more information on the changes in generation, see the "Operating Expenses" section below in this MD&A.

The financial impacts of fluctuations in wholesale energy sales, purchased power, fuel expense, and other power supply-related expenses are addressed in Idaho Power's Idaho and Oregon power cost adjustment mechanisms, which are described below in "Power Cost Adjustment Mechanisms."

### Operating Revenues

***Retail Revenues:*** The table below presents Idaho Power’s retail revenues (in thousands) and MWh sales volumes (in thousands) for the three months and nine months ended September 30, 2023 and 2022, and the number of customers as of September 30, 2023 and 2022.

| Retail revenues: | Three months ended September 30, 2023 | 2022 | Nine months ended September 30, 2023 | 2022 |
| --- | ---: | ---: | ---: | ---: |
| Residential (includes $5,583, $(1,447), $20,170, and $14,104, respectively, related to the FCA)(1) | $181,736 | $176,514 | $505,158 | $470,402 |
| Commercial (includes $328, $142, $900, and $730, respectively, related to the FCA)(1) | 107,971 | 101,794 | 283,478 | 259,620 |
| Industrial | 67,522 | 60,306 | 181,312 | 161,353 |
| Irrigation | 104,645 | 105,365 | 168,358 | 164,065 |
| Deferred revenue related to HCC relicensing AFUDC(2) | (2,815) | (2,815) | (6,861) | (6,861) |
| Total retail revenues | $459,059 | $441,164 | $1,131,445 | $1,048,579 |
| Volume of retail sales (MWh) |  |  |  |  |
| Residential | 1,513 | 1,620 | 4,440 | 4,458 |
| Commercial | 1,150 | 1,192 | 3,212 | 3,227 |
| Industrial | 906 | 883 | 2,641 | 2,620 |
| Irrigation | 1,085 | 1,202 | 1,746 | 1,865 |
| Total retail MWh sales | 4,654 | 4,897 | 12,039 | 12,170 |
| Number of retail customers at period end |  |  |  |  |
| Residential | 528,298 | 515,790 |  |  |
| Commercial | 78,233 | 76,988 |  |  |
| Industrial | 132 | 127 |  |  |
| Irrigation | 22,330 | 22,092 |  |  |
| Total customers | 628,993 | 614,997 |  |  |

(1) The FCA mechanism is an alternative revenue program and does not represent revenue from contracts with customers.

(2) As part of its January 30, 2009 general rate case order, the IPUC is allowing Idaho Power to recover a portion of the AFUDC on construction work in progress related to the HCC relicensing process, even though the relicensing process is not yet complete and the costs have not been moved to electric plant in service. Idaho Power is collecting approximately $8.8 million annually in the Idaho jurisdiction but is deferring revenue recognition of the amounts collected until the license is issued and the accumulated license costs approved for recovery are placed in service.

Changes in rates, changes in customer usage, customer growth, and changes in FCA mechanism revenues are the primary reasons for fluctuations in retail revenues from period to period. The primary influences on customer usage of electricity are weather, economic conditions, and energy efficiency. Extreme temperatures increase sales to customers who use electricity for cooling and heating, while moderate temperatures decrease sales. Precipitation levels and the timing of precipitation during the agricultural growing season also affect sales to customers who use electricity to operate irrigation pumps. Rates are also seasonally adjusted, providing for higher rates during peak load periods, and residential customer rates are tiered, providing for higher rates based on higher levels of usage. The seasonal and tiered rate structures contribute to seasonal fluctuations in revenues and earnings.

Retail revenues increased $17.9 million and $82.9 million during the third quarter and first nine months of 2023, respectively, compared with the same periods in 2022. The factors affecting retail revenues during the periods are discussed below.

- Rates: Average customer rates, excluding amounts related to the power cost adjustment mechanisms, increased retail revenues by $0.9 million and $11.0 million, respectively, for the three and nine months ended September 30, 2023, compared with the same periods in 2022. The increase in the first nine months of 2023 was due primarily to the June 1, 2022, rate increase for Idaho Power's retail customers related to the Bridger Order. Customer rates also include the collection from customers of amounts related to the power cost adjustment mechanisms, which increased revenues by $31.2 million and $75.4 million in the third quarter and first nine months of 2023, respectively, compared with the same periods of 2022. The amount collected from customers in rates under the power cost adjustment mechanisms has relatively little effect on operating income as a corresponding amount is recorded as expense in the same period it is collected through rates.
- Customers: Customer growth of 2.3 percent during the twelve months ended September 30, 2023, increased retail revenues by $7.5 million and $19.6 million in the third quarter and first nine months of 2023, respectively, compared with the same periods of 2022.
- Usage: Decreased usage (on a per customer basis) in all customer classes decreased retail revenues by $28.9 million and $29.3 million in the third quarter and first nine months of 2023, respectively, compared with the same periods of 2022. More precipitation in Idaho Power's service area during the spring and late summer of 2023 compared with the same period of 2022 led agricultural irrigation customers to use 10 percent and 6 percent less energy per customer to operate irrigation pumps during the third quarter and first nine months of 2023, respectively, compared with the same periods in 2022. Usage per residential and commercial customer during the third quarter and first nine months of 2023 was lower than the same periods in 2022, primarily due to weather variations that caused these customers to use less energy per customer for cooling in the spring and early summer of 2023.
- Idaho FCA Revenue: The FCA mechanism, applicable to Idaho residential and small commercial customers, adjusts revenue each year to accrue, or defer, the difference between the authorized fixed-cost recovery amount per customer and the actual fixed costs per customer recovered by Idaho Power through volume-based rates during the year. Lower usage (on a per customer basis) by residential and small commercial customers during the third quarter and first nine months of 2023 increased the amount of FCA revenue accrued by $7.2 million and $6.2 million, respectively compared with the same periods in 2022.

***Wholesale Energy Sales:*** Wholesale energy sales consist primarily of long-term sales contracts, sales of surplus system energy, and sales into the energy imbalance market in the western United States, and do not include derivative transactions. The table below presents Idaho Power’s wholesale energy sales for the three and nine months ended September 30, 2023 and 2022 (in thousands, except for revenue per MWh amounts).

|  | Three months ended September 30, 2023 | 2022 | Nine months ended September 30, 2023 | 2022 |
| --- | ---: | ---: | ---: | ---: |
| Wholesale energy revenues | $5,065 | $34,501 | $50,461 | $44,516 |
| Wholesale MWh sold | 171 | 182 | 697 | 320 |
| Wholesale energy revenues per MWh | $29.62 | $189.57 | $72.40 | $139.11 |

In the third quarter of 2023, wholesale energy revenues decreased $29.4 million, or 85 percent, compared with third quarter of 2022, due primarily to lower wholesale market prices. Wholesale energy revenues increased $5.9 million in the first nine months of 2023 compared with the first nine months of 2022, as higher wholesale energy sales volumes were mostly offset by lower wholesale market prices. The increase in wholesale energy volumes sold during the nine months ended September 30, 2023, was also partially due to energy originally purchased under derivative forward contracts to be bundled with renewable energy credits, but the energy was ultimately sold in the wholesale markets in the first quarter of 2023. Those sales increased wholesale energy revenues by $16.7 million in the first nine months of 2023 and a corresponding amount was recorded in purchased power on the condensed consolidated statements of income. The financial impacts of fluctuations in wholesale energy sales are largely mitigated by Idaho Power's Idaho and Oregon power cost adjustment mechanisms, which are described below in this section of the MD&A under "Power Cost Adjustment Mechanisms."

***Transmission Wheeling-Related Revenues:*** Transmission wheeling-related revenues decreased $2.8 million, or 12 percent, and increased $4.0 million, or 7 percent, during the third quarter and first nine months of 2023, respectively, compared with the same periods of 2022. Milder weather in the southwest United States and Pacific Northwest during the third quarter of 2023 compared with the third quarter of 2022 led to a narrow price spread between energy market hubs which resulted in lower wheeling volumes. The increased wheeling revenue for the first nine months of 2023 compared with the same period of 2022 was primarily due to elevated energy prices in the western United States during the first half of 2023 compared with the same period in 2022. Also, Idaho Power's OATT rates were approximately 1 percent higher in the first nine months of 2023 compared with the first nine months of 2022.

***Energy Efficiency Program Revenues:*** In both Idaho and Oregon, energy efficiency riders fund energy efficiency program expenditures. Expenditures funded through the riders are reported as an operating expense with an equal amount recorded in revenues, resulting in no net impact on earnings. The cumulative variance between expenditures and amounts collected through the rider is recorded as a regulatory asset or liability. A liability balance indicates that Idaho Power has collected more than it has spent and an asset balance indicates that Idaho Power has spent more than it has collected. At September 30, 2023, Idaho Power's energy efficiency rider balances were regulatory liabilities of $2.6 million in the Idaho jurisdiction and $0.8 million in the Oregon jurisdiction.

### Operating Expenses

***Purchased Power:*** The table below presents Idaho Power’s purchased power expenses and volumes for the three months and nine months ended September 30, 2023 and 2022 (in thousands, except for per MWh amounts).

|  | Three months ended September 30, 2023 | 2022 | Nine months ended September 30, 2023 | 2022 |
| --- | ---: | ---: | ---: | ---: |
| Purchased power expense | $142,851 | $192,884 | $405,404 | $370,035 |
| MWh purchased | 1,798 | 1,874 | 5,541 | 5,378 |
| Average cost per MWh | $79.45 | $102.93 | $73.16 | $68.81 |

Purchased power expense decreased $50.0 million in the third quarter of 2023 compared with the third quarter of 2022, due primarily to lower wholesale energy market prices as milder summer weather resulted in lower demand and lower fuel costs (natural gas and coal) in the wholesale markets in the western United States compared with the third quarter of 2022. Purchased power expense increased $35.4 million, or 10 percent, in the first nine months of 2023 compared with the same period of 2022, due primarily to elevated wholesale energy prices in the western United States during the first half of 2023 and, to a lesser extent, higher generation from projects under power purchase agreements.

***Fuel Expense:*** The table below presents Idaho Power’s fuel expenses and thermal generation for the three months and nine months ended September 30, 2023 and 2022 (in thousands, except for per MWh amounts).

| Expense | Three months ended September 30, 2023 | 2022 | Nine months ended September 30, 2023 | 2022 |
| --- | ---: | ---: | ---: | ---: |
| Coal | $31,792 | $35,185 | $57,521 | $85,190 |
| Natural gas | 39,931 | 28,446 | 134,396 | 58,560 |
| Total fuel expense | $71,723 | $63,631 | $191,917 | $143,750 |
| MWh generated |  |  |  |  |
| Coal | 844 | 1,288 | 1,452 | 2,883 |
| Natural gas | 1,035 | 844 | 2,222 | 1,482 |
| Total MWh generated | 1,879 | 2,132 | 3,674 | 4,365 |
| Average cost per MWh - Coal | $37.67 | $27.32 | $39.62 | $29.55 |
| Average cost per MWh - Natural gas | $38.58 | $33.70 | $60.48 | $39.51 |
| Weighted average, all sources | $38.17 | $29.85 | $52.24 | $32.93 |

The majority of the fuel for Idaho Power’s jointly-owned coal-fired plants is purchased through long-term contracts, including purchases from BCC, a one-third owned joint venture of IERCo. The price of coal from BCC is subject to fluctuations in mine operating expenses, geologic conditions, and production levels. BCC supplies approximately two-thirds of the coal used by the Jim Bridger plant. Natural gas is mainly purchased on the regional wholesale spot market at published index prices. In addition to commodity (variable) costs, both natural gas and coal expenses include costs that are more fixed in nature for items such as capacity charges, transportation, and fuel handling. Period-to-period variances in fuel expense per MWh are noticeably impacted by these fixed charges when generation output is substantially different between the periods.

Fuel expense increased $8.1 million, or 13 percent, and $48.2 million, or 34 percent, in the third quarter and first nine months of 2023, respectively, compared with the same periods of 2022, despite lower total thermal generation. The increases in fuel expense were primarily due to higher natural gas market prices and higher coal purchase prices in 2023, which resulted in an increase in the average cost per MWh of natural gas and coal generation. The mix of Idaho Power's thermal generation between natural gas and coal in the third quarter and first nine months of 2023 compared with the same periods of 2022 was affected by fluctuations in natural gas prices, and Idaho Power optimizing its dispatch of coal generation resources in an effort to help ensure adequate coal supply during its peak periods.

Included in fuel expense are gains and losses on settled financial gas hedges entered into in accordance with Idaho Power's energy risk management policy. In the third quarter of 2023, losses on financial gas hedges of $7.9 million increased natural gas fuel expense, while in the third quarter of 2022 and the first nine months of 2023 and 2022, gains on financial gas hedges of

$24.2 million, $4.2 million, and $28.6 million, respectively, reduced natural gas fuel expense. Most of these realized hedging gains and losses are passed on to customers through the power cost adjustment mechanisms described below.

***Power Cost Adjustment Mechanisms:*** Idaho Power's power supply costs (primarily purchased power and fuel expense, less wholesale energy sales) can vary significantly from year to year. Volatility of power supply costs arises from factors such as weather conditions, wholesale market prices, volumes of power purchased and sold in the wholesale markets, Idaho Power's hydropower and thermal generation volumes and fuel costs, generation plant availability, and retail loads. To address the volatility of power supply costs, Idaho Power's power cost adjustment mechanisms in the Idaho and Oregon jurisdictions allow Idaho Power to recover from customers, or refund to customers, most of the fluctuations in power supply costs. The PCA includes a cost or benefit sharing ratio that allocates the deviations in net power supply expenses between customers (95 percent) and Idaho Power (5 percent), with the exception of PURPA power purchases and demand response program incentives, which are allocated 100 percent to customers. The Idaho deferral period, or PCA year, runs from April 1 through March 31. Amounts deferred or accrued during the PCA year are primarily recovered or refunded during the subsequent June 1 through May 31 period. However, the IPUC directed Idaho Power to spread recovery of the March 31, 2023, PCA deferral balance over a two-year period from June 1, 2023, to May 31, 2025. Because of the power cost adjustment mechanisms, the primary financial impacts of power supply cost variations are that cash is paid out but recovery from customers does not occur until a future period, or cash that is collected is refunded to customers in a future period, resulting in fluctuations in operating cash flows from year to year.

The table that follows presents the components of the Idaho and Oregon power cost adjustment mechanisms for the three months and nine months ended September 30, 2023 and 2022 (in thousands).

|  | Three months ended September 30, 2023 | 2022 | Nine months ended September 30, 2023 | 2022 |
| --- | ---: | ---: | ---: | ---: |
| Power supply cost deferral | $(22,131) | $(42,885) | $(47,482) | $(40,246) |
| Oregon power supply cost accrual | — | — | 335 | — |
| Amortization of prior year authorized balances | 28,030 | 12,079 | 51,338 | 8,615 |
| Total power cost adjustment (income statement) | $5,899 | $(30,806) | $4,191 | $(31,631) |

The power supply accruals (deferrals) represent the portion of the power supply cost fluctuations accrued (deferred) under the power cost adjustment mechanisms. When actual power supply costs are lower than the amount forecasted in power cost adjustment rates, most of the difference is accrued as an increase to a regulatory liability or decrease to a regulatory asset. When actual power supply costs are higher than the amount forecasted in power cost adjustment rates, most of the difference is deferred as an increase to a regulatory asset or decrease to a regulatory liability. During the third quarter and first nine months of 2023, higher purchased power and fuel costs led to higher actual power supply costs compared with the forecasted amount, which resulted in an increase in the amount of power supply costs deferred by the mechanism. The amortization of the prior year’s balances represents the offset to the amounts being collected or refunded in the current power cost adjustment year that were deferred or accrued in the prior PCA year.

***Other O&M Expenses:*** Total other O&M expenses decreased $4.9 million, or 5 percent, and $8.3 million, or 3 percent, in the third quarter and first nine months of 2023, respectively, compared with the same periods of 2022, due primarily to lower expenses from scheduled cyclical plant maintenance projects, as well as the timing of regulatory deferrals and payment credits received related to a jointly funded infrastructure project, offset partially by inflationary pressures on labor-related and other costs.

### Income Taxes

IDACORP and Idaho Power income tax expense decreased $0.8 million and $1.1 million, respectively, for the first nine months of 2023 when compared with the same period of 2022, as increased taxes from higher pre-tax income was more than offset by $7.5 million of additional ADITC amortization. Idaho Power did not record any additional ADITC amortization in 2022. For information relating to IDACORP's and Idaho Power's computation of income tax expense, see Note 2 - "Income Taxes" to the condensed consolidated financial statements included in this report.

### LIQUIDITY AND CAPITAL RESOURCES

### Overview

Idaho Power funds its liquidity needs for capital expenditures through cash flows from operations, debt offerings, commercial paper markets, credit facilities, a term loan facility, and capital contributions from IDACORP. Idaho Power periodically files for rate adjustments for recovery of operating costs and capital investments to provide the opportunity to align Idaho Power's earned returns with those allowed by regulators.

As of October 27, 2023, IDACORP's and Idaho Power's access to debt, equity, and credit arrangements included:

- their respective $100 million and $300 million revolving credit facilities;
- IDACORP's shelf registration statement filed with the SEC on May 16, 2022, which may be used for the issuance of debt securities and common stock;
- Idaho Power's shelf registration statement filed with the SEC on May 16, 2022, which may be used for the issuance of first mortgage bonds and other debt securities; $280 million remains available for issuance pursuant to state regulatory authority; and
- IDACORP's and Idaho Power's issuance of commercial paper, which may be issued up to an amount equal to the available credit capacity under their respective credit facilities.

In March 2023, Idaho Power issued the following long-term debt with the proceeds being used for general corporate purposes, including repaying outstanding commercial paper and long-term debt and funding Idaho Power's capital projects:

- $60 million of 5.06% first mortgage bonds, secured medium-term notes, Series N, maturing in March 2043;
- $62 million of 5.20% first mortgage bonds, secured medium-term notes, Series N, maturing in March 2053; and
- $400 million of 5.50% first mortgage bonds, secured medium-term notes, Series M, maturing in March 2053.

During March through May 2023, a portion of the proceeds from the March 2023 issuances was used to repay outstanding commercial paper, $150 million in principal amount from a March 2022 term loan agreement, and $75 million in principal amount of maturing 2.50% first mortgage bonds, Series I.

In September 2023, Idaho Power issued $350 million of 5.80% first mortgage bonds, secured medium-term notes, Series M, maturing in April 2054. Idaho Power plans to use the proceeds for general corporate purposes including funding its capital projects.

In addition to the discussion above, which includes notable liquidity developments in 2023, more information on IDACORP's and Idaho Power's debt, equity, and credit facilities is included in Part II, Item 7 - "MD&A – Financing Programs and Available Liquidity" in the 2022 Annual Report.

IDACORP and Idaho Power monitor capital markets with a view toward opportunistic debt and equity transactions, taking into account current and potential future long-term needs. As a result, IDACORP may issue debt securities or common stock, and Idaho Power may issue first mortgage bonds or other debt securities, if the companies believe terms available in the capital markets are favorable and that issuances would be financially prudent.

Based on planned capital expenditures and other O&M expenses, the companies believe they will be able to meet capital and debt service requirements and fund corporate expenses during at least the next twelve months and thereafter for the foreseeable future with a combination of existing cash, operating cash flows generated by Idaho Power's utility business, availability under existing credit facilities, access to commercial paper, short-term and long-term debt markets, and equity issuances.

IDACORP and Idaho Power generally seek to maintain capital structures of approximately 50 percent debt and 50 percent equity. Maintaining this ratio influences IDACORP's and Idaho Power's debt and equity issuance decisions. As of September 30, 2023, IDACORP's and Idaho Power's capital structures, as calculated for purposes of applicable debt covenants, were as follows:

|  | IDACORP | Idaho Power |
| --- | ---: | ---: |
| Debt | 49% | 50% |
| Equity | 51% | 50% |

49

IDACORP and Idaho Power generally maintain their cash and cash equivalents in highly liquid investments, such as U.S. Treasury Bills, money market funds, and bank deposits.

IDACORP and Idaho Power believe they were in compliance with all credit facility and long-term debt covenants at September 30, 2023. Further, IDACORP and Idaho Power do not anticipate they will be in violation or breach of their respective debt covenants during 2023.

### Operating Cash Flows

IDACORP’s and Idaho Power's principal sources of cash flows from operations are Idaho Power's sales of electricity and transmission capacity. Significant uses of cash flows from operations include the purchase of fuel and power, other operating expenses, interest, income taxes, and plan contributions. Operating cash flows can be significantly influenced by factors such as weather conditions, rates and the outcome of regulatory proceedings, and economic conditions. As fuel and purchased power are significant uses of cash, Idaho Power has regulatory mechanisms in place that provide for the deferral and recovery of the majority of the fluctuation in those costs. However, if actual costs rise above the level currently allowed in retail rates, deferral balances increase (reflected as a regulatory asset), negatively affecting operating cash flows until such time as those costs, with interest, are recovered from customers.

IDACORP’s and Idaho Power’s operating cash inflows for the nine months ended September 30, 2023, were $162 million and $138 million, respectively, a decrease in cash flows from operations of $107 million for IDACORP and $156 million for Idaho Power, respectively, when compared with the same period in 2022. With the exception of cash flows related to income taxes, IDACORP's operating cash flows are principally derived from the operating cash flows from Idaho Power. Significant items that affected the companies' operating cash flows in the first nine months of 2023 when compared with the same period in 2022 were as follows:

- a $13 million increase in IDACORP and Idaho Power net income;
- changes in deferred taxes and taxes accrued and receivable combined to increase IDACORP and Idaho Power cash flows by $32 million and $67 million, respectively;
- changes in contributions to pension and postretirement benefit plans decreased IDACORP and Idaho Power cash flows by $11 million; and
- changes in working capital balances due primarily to timing, including fluctuations as follows:
- timing of accounts receivable and unbilled revenues increased operating cash flows by $47 million for IDACORP and $46 million for Idaho Power,
- the changes in materials, supplies, and fuel stock decreased operating cash flows by $49 million for IDACORP and Idaho Power, which was primarily due to an increase in material and supply inventory, and the timing of purchases and consumption of coal at Idaho Power's jointly-owned coal-fired generating plants; and
- the changes in accounts and wages payable decreased operating cash flows by $136 million for IDACORP and $220 million for Idaho Power, which was primarily due to a decrease in power supply costs and associated timing of payments. The $84 million difference between IDACORP and Idaho Power is related to timing of intercompany estimated tax payments.

### Investing Cash Flows

Investing activities consist primarily of capital expenditures related to new construction of, and improvements to, Idaho Power’s generation, transmission, and distribution facilities. IDACORP’s and Idaho Power’s net investing cash outflows for the nine months ended September 30, 2023, were $412 million and $403 million, respectively. Investing cash outflows for 2023 were primarily for construction of utility infrastructure needed to address Idaho Power’s customer growth, aging plant and equipment, and environmental and regulatory compliance requirements. Significant items and transactions that affected investing cash flows in the first nine months of 2023 included:

- $427 million of additions to property, plant and equipment, including $92 million spent on battery storage projects, and at September 30, 2023, $8 million was accrued in accounts payable on their consolidated balances sheets related to battery storage projects;
- $15 million received from Boardman-to-Hemingway project joint permitting participants relating to a portion of the permitting expenditures and a security deposit; and
- $6 million in sales of equity securities, held in a rabbi trust, which is designated to provide funding for obligations related to Idaho Power's SMSP.

### Financing Cash Flows

Financing activities provide supplemental cash for both day-to-day operations and capital requirements, as needed. IDACORP's and Idaho Power's net financing cash inflows for the nine months ended September 30, 2023, were $518 million and $561 million, respectively. Idaho Power funds liquidity needs for capital investment, working capital, managing commodity price risk, dividends, and other financial commitments through cash flows from operations, debt offerings, commercial paper markets, credit facilities, a term loan facility, and capital contributions from IDACORP. IDACORP funds its cash requirements, such as payment of taxes, payment of dividends, capital contributions to Idaho Power, and non-utility expenses allocated to IDACORP, through cash flows from operations, commercial paper markets, sales of common stock, and credit facilities. Significant items and transactions that affected financing cash flows in the first nine months of 2023 were as follows:

- in March 2023, Idaho Power repaid $100 million in principal amount of a March 2022 term loan agreement;
- in March 2023, Idaho Power issued $60 million in principal amount of 5.06% first mortgage bonds, secured medium-term notes, Series N, maturing in March 2043;
- in March 2023, Idaho Power issued $62 million in principal amount of 5.20% first mortgage bonds, secured medium-term notes, Series N, maturing in March 2053;
- in March 2023, Idaho Power issued $400 million in principal amount of 5.50% first mortgage bonds, secured medium-term notes, Series M, maturing in March 2053;
- in April 2023, Idaho Power repaid, at maturity, $75 million in principal amount of 2.50% first mortgage bonds, secured medium-term notes, Series I;
- in May 2023, Idaho Power repaid $50 million in principal amount of a March 2022 term loan agreement;
- in September 2023, Idaho Power issued $350 million in principal amount of 5.80% first mortgage bonds, secured medium-term notes, Series M, maturing in April 2054; and
- IDACORP and Idaho Power paid dividends of $121 million and $81 million in 2023, respectively.

### Available Short-Term Borrowing Liquidity

The table below outlines available short-term borrowing liquidity as of the dates specified (in thousands).

|  | September 30, 2023 IDACORP(2) | Idaho Power | December 31, 2022 IDACORP(2) | Idaho Power |
| --- | ---: | ---: | ---: | ---: |
| Revolving credit facility | $100,000 | $300,000 | $100,000 | $300,000 |
| Commercial paper outstanding | — | — | — | — |
| Identified for other use(1) | — | (19,885) | — | (19,885) |
| Net balance available | $100,000 | $280,115 | $100,000 | $280,115 |

(1) American Falls bonds that Idaho Power could be required to purchase prior to maturity under the optional or mandatory purchase provisions of the bonds, if the remarketing agent for the bonds is unable to sell the bonds to third parties.

(2) Holding company only.

Idaho Power has regulatory authority through December 2026 to incur up to $450 million in principal amount of short-term borrowing indebtedness at any one time outstanding. Idaho Power submitted applications to the IPUC, OPUC, and WPSC in October 2023, requesting authorization for the company to incur, issue, and sell from time to time up to $600 million in aggregate principal amount at any one time of unsecured borrowings through December 2030.

On October 27, 2023, IDACORP and Idaho Power had no loans outstanding under their revolving credit facilities and had no commercial paper outstanding.

The table below presents additional information about short-term commercial paper borrowing (in thousands) during the three and nine months ended September 30, 2023.

| Commercial Paper: Period end: | Three months ended September 30, 2023 IDACORP(1) | Idaho Power | Nine months ended September 30, 2023 IDACORP(1) | Idaho Power |
| --- | ---: | ---: | ---: | ---: |
| Amount outstanding | $— | $— | $— | $— |
| Weighted average interest rate | —% | —% | —% | —% |
| Daily average amount outstanding during the period | $— | $— | $— | $12,301 |
| Weighted average interest rate during the period | —% | —% | —% | 4.94% |
| Maximum month-end balance | $— | $— | $— | $110,000 |

(1) Holding company only.

### Impact of Credit Ratings on Liquidity and Collateral Obligations

IDACORP’s and Idaho Power’s access to capital markets, including the commercial paper market, and their respective financing costs in those markets, depend in part on their respective credit ratings. There have been no changes to IDACORP's or Idaho Power's ratings by S&P Global Ratings or Moody’s Investors Service from those included in the 2022 Annual Report. However, any rating can be revised upward or downward or withdrawn at any time by a rating agency if it decides that the circumstances warrant the change.

Idaho Power maintains margin agreements relating to its wholesale commodity contracts that allow performance assurance collateral to be requested of and/or posted with certain counterparties. As of September 30, 2023, Idaho Power had posted $29 million of cash performance assurance collateral related to these contracts. Should Idaho Power experience a reduction in its credit rating on its unsecured debt to below investment grade, Idaho Power could be subject to requests by its wholesale counterparties to post additional performance assurance collateral, and counterparties to derivative instruments and other forward contracts could request immediate payment or demand immediate ongoing full daily collateralization on derivative instruments and contracts in net liability positions. Based upon Idaho Power’s energy and fuel portfolio and then-existing market conditions, as of September 30, 2023, the amount of additional collateral that could have been requested upon a downgrade to below investment grade was approximately $10 million. To minimize capital requirements, Idaho Power actively monitors its portfolio exposure and the potential exposure to additional requests for performance assurance collateral through sensitivity analysis.

### Capital Requirements

Idaho Power's cash capital expenditures, excluding AFUDC, were $413 million during the nine months ended September 30, 2023. The table below presents Idaho Power's estimated accrual-basis additions to property, plant, and equipment for 2023 (including amounts incurred to-date) through 2027 (in millions of dollars). The amounts in the table exclude AFUDC but include net costs of removing assets from service that Idaho Power expects would be eligible to be included in rate base in future rate case proceedings. Given the uncertainty associated with the timing of infrastructure projects and associated expenditures, actual expenditures and their timing could deviate substantially from those set forth in the table. The capital expenditure table below assumes, among other projects, construction and ownership of a number of capacity resources identified in Idaho Power's RFPs and 2023 IRP in order to safely and reliably serve Idaho Power's customers. The timing and amount of actual constructed projects and capital expenditures could be affected by Idaho Power’s ability to timely obtain labor or materials at reasonable costs, supply chain disruptions and delays, regulatory determinations, inflationary pressures, macroeconomic conditions, or other issues, including those described below.

|  | 2023 | 2024 | 2025-2027 |
| --- | --- | --- | --- |
| Expected capital expenditures (excluding AFUDC) | $675-$725 | $850-$950 | $2,000-$2,500 |

***Major Infrastructure Projects:*** Idaho Power is engaged in the development of a number of significant projects and has entered into arrangements with third parties concerning joint infrastructure development. The discussion below provides a summary of developments in certain of those projects since the discussion of these matters included in Part II, Item 7 - "MD&A - Capital Requirements" in the 2022 Annual Report. The discussion below should be read in conjunction with that report.

Resource Additions to Address Projected Energy and Capacity Deficits: As noted previously, Idaho Power's existing and sustained growth in customers, load, and peak demand for electricity, along with transmission constraints, has created the need for Idaho Power to acquire significant generation, transmission, and storage resources to meet energy and capacity needs over the next several years. To help meet peak needs in 2023 through 2025, Idaho Power entered into contracts to purchase, own, and operate approximately 300 MW of battery storage assets with expected useful lives of approximately 20 years, entered into a 20-year agreement to purchase the storage capacity from a 150-MW battery storage facility, and also entered into three power purchase agreements for the combined 340 MW output of planned third-party solar facilities with 20- to 25-year terms. As described in “Regulatory Matters” of this MD&A, Idaho Power plans to sell the output of two of these solar power purchase agreements totaling 240 MW exclusively to two large industrial customers under agreements modeled after Idaho Power’s Clean Energy Your Way program. To help address the additional capacity deficits projected for 2026 through 2027, Idaho Power has issued an RFP for additional resources. The capital requirements table above includes capital expenditures of more than $400 million in the years 2023 through 2025 for resource additions to address projected energy and capacity deficits in those years, but does not currently include any amounts for possible company-owned resources from the RFP to address projected deficits in 2026 or 2027. Depending on factors such as RFP results, the timing of project in-service dates, estimated load and resource balances and customer growth, the nature and quantity of resources owned versus acquired under power purchase agreements or similar agreements, and the outcome of regulatory proceedings, actual expenditures and their timing could deviate substantially from Idaho Power's expected expenditures.

Boardman-to-Hemingway Transmission Line: The Boardman-to-Hemingway line, a planned 300-mile, high-voltage transmission project between a substation near Boardman, Oregon, and the Hemingway substation near Boise, Idaho, is expected to provide transmission service to meet future resource needs. Material procurement and construction subcontract bid events are in progress. As a result of delays in issuing Notices to Proceed from state and federal agencies, Idaho Power expects construction will begin in the first half of 2024. Given the status of ongoing activities and the construction period, Idaho Power expects the in-service date for the transmission line will be no earlier than 2026.

Until recently, Idaho Power had a joint funding agreement with PacifiCorp and BPA to pursue permitting of the project, with Idaho Power having an approximate 21 percent interest, BPA having an approximate 24 percent interest, and PacifiCorp having an approximate 55 percent interest in the permitting phase of the project. In March 2023, BPA, PacifiCorp, and Idaho Power signed various agreements to facilitate certain asset transfers and other coordination efforts among the parties as the transmission line moves toward construction. In particular, an agreement between Idaho Power and BPA transferred BPA’s total interest in the project to Idaho Power, increasing Idaho Power's interest to approximately 45 percent, and provided that Idaho Power will deliver transmission service to BPA's customers across southern Idaho. The agreement also required BPA to make a $10 million security payment to Idaho Power. On Idaho Power's condensed consolidated balance sheet, the agreement increased construction work in progress by $31 million for the acquired permitting interest, cash and cash equivalents by $10 million for the additional security payment, and other non-current liabilities by $41 million for Idaho Power's obligation to pay for the permitting interest and to return the security deposit to BPA. Payments to BPA for the permitting interest are expected to be made over a 15-year period beginning 10 years after energization of the transmission line project, while the security deposit is due to be returned to BPA upon energization.

Idaho Power has spent approximately $198 million, including Idaho Power's AFUDC, on the Boardman-to-Hemingway project through September 30, 2023. Pursuant to the terms of the joint funding arrangements, Idaho Power has received $113 million in reimbursement as of September 30, 2023, from project co-participants for their share of costs (including $31 million related to BPA's share, which was transferred to Idaho Power in March 2023 as part of the agreement described above) and continues to receive reimbursement as costs are incurred. The remaining joint permitting participant is obligated to reimburse Idaho Power for its share of any future project permitting expenditures or agreed upon early construction expenditures incurred by Idaho Power under the terms of the joint funding agreement.

The permitting phase of the Boardman-to-Hemingway project was subject to federal review and approval by various federal agencies. Federal agency records of decision have been received and all lawsuits challenging the federal rights-of-way have been resolved. In the separate State of Oregon permitting process, the state's EFSC approved Idaho Power's site certificate on September 27, 2022. The Oregon Department of Energy subsequently issued a final order and site certificate. Three parties filed appeals to the Oregon Supreme Court asking that court to overturn EFSC's approval of the Boardman-to-Hemingway site certificate. On March 9, 2023, the Oregon Supreme Court affirmed the EFSC's final order approving Idaho Power's site certificate.

In June 2023, Idaho Power and PacifiCorp executed a construction funding agreement and filed it with the FERC. The agreement became fully effective in September 2023 upon the meeting of the conditions precedent contained in the agreement including acceptance of the agreement by the FERC, receipt of the CPCNs for Boardman-to-Hemingway from Oregon and

Idaho for Idaho Power and Idaho and Wyoming for PacifiCorp, and Idaho Power and PacifiCorp consenting to the conditions contained within their respective CPCNs.

During the second quarter of 2023, the IPUC, OPUC, and Wyoming Public Service Commission granted Idaho Power and PacifiCorp their respective CPCNs related to the construction of the Boardman-to-Hemingway project.

Total cost estimates for the project are between $1.5 billion and $1.7 billion, including Idaho Power's AFUDC. The capital requirements table above includes approximately $640 million of Idaho Power's share of estimated costs (excluding AFUDC) related to the remaining permitting phase, design, material procurement, and construction phases of the project. Actual construction costs could differ from Idaho Power's estimates based upon Idaho Power’s or its contractors ability to timely obtain labor or materials at reasonable costs, supply chain disruptions and delays, inflationary pressures, macroeconomic conditions, or other issues.

Gateway West Transmission Line: Idaho Power and PacifiCorp are pursuing the joint development of the Gateway West project, a high-voltage transmission lines project between a substation located near Douglas, Wyoming, and the Hemingway substation located near Boise, Idaho. In 2012, Idaho Power and PacifiCorp entered a joint funding agreement for permitting of the project. Idaho Power has expended approximately $58 million, including Idaho Power's AFUDC, for its share of the permitting phase of the project through September 30, 2023.

The permitting phase of the Gateway West project was subject to review and approval of the U.S. Bureau of Land Management (BLM). The BLM has published its records of decision for all segments of the transmission line. In late 2020, PacifiCorp completed construction and commissioned a 140-mile segment of its portion of the project in Wyoming. In March 2023, PacifiCorp initiated the pre-construction phase of 620 miles of 500-kV transmission line from the Populus substation near Downey, Idaho, to the Hemingway substation near Boise, Idaho. Idaho Power and PacifiCorp continue to coordinate the timing of next steps to best meet customer and system needs including potentially modifying the ownership structure of a few segments of the project.

As of the date of this report, Idaho Power estimates the total cost for its share of the project (including both permitting and construction) to be in the range of between $900 million and $1.1 billion, including Idaho Power's AFUDC. The estimated cost range includes the possibility of an increase in Idaho Power participation in the construction of certain project segments, for which Idaho Power would need to coordinate with PacifiCorp. The capital requirements table above includes approximately $370 million of Idaho Power's share of estimated costs (excluding AFUDC) for the permitting phase of the project and early construction costs, based on Idaho Power's current estimate that it may commence construction of applicable segments during that time period. Actual construction costs could differ from Idaho Power's estimates based upon the ability of Idaho Power, PacificCorp, or their respective contractors to timely obtain labor or materials at reasonable costs, supply chain disruptions and delays, inflationary pressures, macroeconomic conditions, or other issues.

### Defined Benefit Pension Plan Contributions

Idaho Power has no minimum contribution requirement to its defined benefit pension plan in 2023, and during the nine months ended September 30, 2023, Idaho Power made contributions of $48 million in a continued effort to balance the regulatory collection of these expenditures with the amount and timing of contributions, as well as to mitigate the cost of being in an underfunded position. The primary impact of pension contributions is on the timing of cash flows, as the timing of cost recovery lags behind contributions.

### Contractual Obligations

IDACORP’s and Idaho Power’s contractual cash obligations have not materially changed during the nine months ended September 30, 2023, except as disclosed in Note 5 – “Long-Term Debt” and Note 8 – “Commitments” to the condensed consolidated financial statements included in this report.

### Dividends

The amount and timing of dividends paid on IDACORP’s common stock are within the discretion of IDACORP’s board of directors. IDACORP's board of directors reviews the dividend rate periodically to determine its appropriateness in light of IDACORP’s current and long-term financial position and results of operations, capital requirements, rating agency considerations, contractual and regulatory restrictions, legislative and regulatory developments affecting the electric utility industry in general and Idaho Power in particular, competitive conditions, and any other factors the board of directors deems relevant. The ability of IDACORP to pay dividends on its common stock is generally dependent upon dividends paid to it by its subsidiaries, primarily Idaho Power.

For additional information relating to IDACORP and Idaho Power dividends, including restrictions on IDACORP’s and Idaho Power’s payment of dividends, see Note 6 - “Common Stock” to the condensed consolidated financial statements included in this report.

### Off-Balance Sheet Arrangements

IDACORP's and Idaho Power's off-balance sheet arrangements have not changed materially from those reported in MD&A in the 2022 Annual Report.

### REGULATORY MATTERS

### Introduction

Idaho Power is under the jurisdiction (as to rates, service, accounting, and other general matters of utility operation) of the IPUC, the OPUC, and the FERC. The IPUC and OPUC determine the rates that Idaho Power is authorized to charge to its retail customers. Idaho Power is also under the regulatory jurisdiction of the IPUC, the OPUC, and the Wyoming Public Service Commission as to the issuance of debt and equity securities. As a public utility under the Federal Power Act, Idaho Power has authority to charge market-based rates for wholesale energy sales under its FERC tariff and to provide transmission services under its OATT. Additionally, the FERC has jurisdiction over Idaho Power's sales of transmission capacity and wholesale electricity, hydropower project relicensing, and system reliability, among other items.

Idaho Power develops its regulatory filings taking into consideration short-term and long-term needs for rate relief and several other factors that can affect the structure and timing of those filings. These factors include in-service dates of major capital investments, the timing and magnitude of changes in major revenue and expense items, and customer growth rates, as well as other factors. In recognition of Idaho Power’s current and anticipated significant infrastructure investments, including those that are intended to help meet projected near-term capacity deficits, Idaho Power filed a general rate case in Idaho on June 1, 2023. As discussed below, the 2023 General Rate Case Settlement Stipulation was filed for that rate case on October 27, 2023. Idaho Power's most recent previous general rate cases in Idaho and Oregon were filed in 2011, and during 2012, large single-issue rate cases for the Langley Gulch power plant reset base rates in Idaho and Oregon. The IPUC and OPUC have also approved base rate changes in single-issue cases subsequent to 2014. Idaho Power expects to file a general rate case in Oregon in December 2023.

Between general rate cases, Idaho Power relies upon customer growth, an FCA mechanism, power cost adjustment mechanisms, tariff riders, and other mechanisms to mitigate the impact of regulatory lag, which refers to the period of time between making an investment or incurring an expense and recovering that investment or expense and earning a return. Management's regulatory focus in recent years has been largely on regulatory settlement stipulations and the design of rate mechanisms.

The outcomes of significant proceedings are described in part in this report and further in the 2022 Annual Report. In addition to the discussion below, which includes notable regulatory developments since the discussion of these matters in the 2022 Annual Report, refer to Note 3 - "Regulatory Matters" to the condensed consolidated financial statements included in this report for additional information regarding Idaho Power's Idaho general rate case filing and other regulatory matters and recent regulatory filings and orders.

### Idaho General Rate Case and Filing of 2023 General Rate Case Settlement Stipulation

On June 1, 2023, Idaho Power filed a general rate case and proposed rate schedules for the Idaho jurisdiction with the IPUC. On October 27, 2023, Idaho Power, the Staff of the IPUC, and intervening parties publicly filed the 2023 General Rate Case Settlement Stipulation related to the Idaho general rate case filing. If the IPUC approves the 2023 General Rate Case Settlement Stipulation, it will authorize Idaho Power's filed general rate case, with the modifications contained in the 2023 General Rate Case Settlement Stipulation.

The 2023 General Rate Case Settlement Stipulation provides that Idaho Power would implement revised tariff schedules designed to recover $54.7 million in additional annual revenue from Idaho jurisdictional base rates effective January 1, 2024, representing a 4.25 percent overall average increase in Idaho Power's annual Idaho jurisdictional base rate revenues. The $54.7 million of additional annual revenue is net of a PCA rate decrease of $168.3 million (moving that amount from collection via the PCA and into base rates) and a reduction to annual energy efficiency rider collection of $3.5 million. The 2023 General Rate

Case Settlement Stipulation also provides for a 9.6 percent return on equity and a 7.247 percent authorized rate of return based on a non-specified cost of debt and capital structure, applied to an Idaho-jurisdictional rate base of approximately $3.8 billion. Idaho Power had requested a 10.4 percent authorized rate of return on equity and an approximate $3.9 billion Idaho retail rate base. See Note 3 – "Regulatory Matters" to the condensed consolidated financial statements included in this report for a more detailed summary of the significant provisions of the general rate case filing and proposed 2023 General Rate Case Settlement Stipulation.

The parties to the 2023 General Rate Case Settlement Stipulation agreed that certain matters would be examined in either separate, subsequent proceedings or continued in the general rate case docket. Those additional matters relate to, among other items, further review of Idaho Power plant investments by IPUC Staff to be completed by December 1, 2023, class cost-of-service methodology, and rate design related to time-of-use rates. The 2023 General Rate Case Settlement Stipulation provides that these subsequent proceedings will not impact the agreements reached in the 2023 General Rate Case Settlement Stipulation. To the extent Staff identifies potential prudence concerns, those prudence concerns would be addressed in Idaho Power's next general rate case.

The parties to the 2023 General Rate Case Settlement Stipulation have requested that the IPUC issue an order approving the agreed-upon rates effective January 1, 2024. Idaho Power is unable to predict whether the IPUC will approve the 2023 General Rate Case Settlement Stipulation or the ultimate outcome of the general rate case proceedings.

The 2023 General Rate Case Settlement Stipulation does not preclude Idaho Power from filing another general rate case in Idaho at any time in the future.

### Notable Retail Rate Changes

During 2023, Idaho Power received orders authorizing the rate changes summarized in the table below.

| Description | Status | Estimated Rate Impact(1) | Notes |
| --- | --- | --- | --- |
| PCA Mechanism - Idaho | New PCA rate became effective June 1, 2023 | $105.1 million PCA increase for the period from June 1, 2023, to May 31, 2024 | The income statement impact of revenue changes associated with the Idaho PCA mechanism is largely offset by associated increases and decreases in actual power supply costs and amortization of deferred power supply costs. The rate increase reflects higher costs associated with market energy and natural gas prices, combined with limited coal supply. The IPUC order approving the PCA increase defers collection of $95.1 million of deferred PCA costs to the subsequent annual PCA collection period. |
| FCA Mechanism - Idaho | New FCA rate became effective June 1, 2023 | $10.1 million FCA decrease for the period from June 1, 2023, to May 31, 2024 | The FCA is designed to remove a portion of Idaho Power’s financial disincentive to invest in energy efficiency programs by partially separating (or decoupling) the recovery of fixed costs from the volumetric kWh charge and instead linking it to a set amount per customer. |
| Annual Power Cost Update - Oregon | New APCU rate became effective June 1, 2023 | $7.7 million APCU increase for the period from June 1, 2023, to May 31, 2024 | The rate increase reflects continued high natural gas prices, combined with limited coal generation and increased forward market electric prices. |

(1) The annual amount collected in rates is typically not recovered on a straight-line basis (i.e., 1/12th per month), and is instead recovered in proportion to retail sales volumes.

### Idaho ADITC and Revenue Sharing Mechanism

A May 2018 Idaho settlement stipulation related to tax reform (May 2018 Idaho Tax Reform Settlement Stipulation) is described in Note 3 - "Regulatory Matters" to the consolidated financial statements included in the 2022 Annual Report. IDACORP and Idaho Power believe that the terms allowing additional amortization of ADITC in the settlement stipulations provide the companies with a greater degree of earnings stability than would be possible without the terms of the stipulations in effect. Based on its estimate of full-year 2023 Idaho ROE, in the three and nine months ended September 30, 2023, Idaho Power recorded zero and $7.5 million, respectively, in additional ADITC amortization under the May 2018 Idaho Tax Reform Settlement Stipulation. Accordingly, at September 30, 2023, $37.5 million of additional ADITC remains available for future use. Idaho Power recorded no additional ADITC amortization or provision against revenues for sharing of earnings with customers during 2022. If approved by the IPUC, the 2023 General Rate Case Settlement Stipulation would modify the Idaho ADITC and revenue sharing mechanism as described in Note 3 – "Regulatory Matters" to the condensed consolidated financial statements included in this report.

### Change in Deferred (Accrued) Net Power Supply Costs and the Power Cost Adjustment Mechanisms

Deferred (accrued) power supply costs represent certain differences between Idaho Power's actual net power supply costs and the costs included in its retail rates, the latter being based on annual forecasts of power supply costs. Deferred (accrued) power supply costs are recorded on the balance sheets for future recovery or refund through customer rates.

Idaho Power's power cost adjustment mechanisms in its Idaho and Oregon jurisdictions address the volatility of power supply costs and provide for annual adjustments to the rates charged to retail customers. The power cost adjustment mechanisms and associated financial impacts are described in "Results of Operations" in this MD&A and in Note 3 - "Regulatory Matters" to the condensed consolidated financial statements included in this report. With the exception of power supply expenses incurred under PURPA and certain demand response program costs that are passed through to customers substantially in full, the Idaho PCA mechanism allows Idaho Power to pass through to customers 95 percent of the differences in actual net power supply expenses as compared with base net power supply expenses, whether positive or negative. Thus, the primary financial statement impact of power supply cost deferrals or accruals is that the timing of when cash is paid out for power supply expenses differs from when those costs are recovered from customers, impacting operating cash flows from year to year.

The following table summarizes the change in deferred (accrued) net power supply costs during the nine months ended September 30, 2023 (in millions).

|  | Idaho | Oregon | Total |
| --- | ---: | ---: | ---: |
| Deferred net power supply costs at December 31, 2022 | $128.7 | $0.6 | $129.3 |
| Current period net power supply costs deferred (accrued) | 47.5 | (0.3) | 47.2 |
| Prior amounts collected through rates | (51.3) | (0.1) | (51.4) |
| SO2 allowance and renewable energy certificate net sales | (9.5) | (0.4) | (9.9) |
| Interest and other | 4.4 | — | 4.4 |
| Deferred (accrued) net power supply costs at September 30, 2023 | $119.8 | $(0.2) | $119.6 |

### 2023 Integrated Resource Plan

Idaho Power filed its most recent IRP with the IPUC and OPUC in September 2023. The 2023 IRP assumes a forecasted annual growth in average energy demand of 2.1 percent and a forecasted annual growth in peak-hour demand of 1.8 percent over the 20-year period. The 2023 IRP preferred resource portfolio and action plan adds 6,888 MW of resource capacity over the next 20 years to meet energy and capacity needs, including the addition of 3,325 MW of solar, 1,800 MW of wind, 1,453 MW of storage, 360 MW of additional energy efficiency, 340 MW of hydrogen, 160 MW from demand response, and 30 MW of geothermal. In addition, the preferred resource portfolio includes Idaho Power's complete exit from coal-fired generation by 2030 and the conversions of multiple jointly-owned coal-fired generation units to natural gas, adding a net total of 261 MW of generation capacity through 2043. To support these resource additions, the preferred portfolio also includes the Boardman-to-Hemingway transmission line in 2026 and three Gateway West transmission line segments phased in with in-service dates from 2028 through 2040. However, as noted in the 2023 IRP, there is considerable uncertainty surrounding the resource sufficiency estimates and project completion dates, including uncertainty around the timing and extent of third party development of renewable resources, fuel commodity prices, and the actual completion date of the transmission projects. These uncertainties, as well as others, could result in changes to the desirability of the preferred portfolio and adjustments to the timing and nature of anticipated and actual actions.

### Open Access Transmission Tariff Posting

Idaho Power uses a formula rate for transmission service provided under its OATT, which provides that transmission rates will be updated annually based primarily on financial and operational data Idaho Power files with the FERC. In October 2023, Idaho Power filed its 2023 final transmission rate with the FERC, reflecting a transmission rate of $30.74 per "kW-year," to be effective for the period from October 1, 2023, to September 30, 2024. A "kW-year" is a unit of electrical capacity equivalent to 1 kilowatt of power used for 8,760 hours. Idaho Power's final rate was based on an annual net point-to-point transmission revenue requirement of $135.7 million. The OATT rate in effect from October 1, 2022, to September 30, 2023, was $31.42 per kW-year based on an annual net point-to-point transmission revenue requirement of $132.7 million.

### Boardman-to-Hemingway Transmission Line Certificates of Public Convenience and Necessity

In June 2023, the IPUC and OPUC both issued orders granting Idaho Power's applications for certificates of public convenience and necessity authorizing construction of the Boardman-to-Hemingway 500-kV transmission line. The Boardman-to-Hemingway project is described in more detail in the "Liquidity and Capital Resources" section of this MD&A.

### Oregon Resource Procurement Filing

The State of Oregon has competitive bidding rules regarding a public utility's procurement of resources. However, as allowed by the rules in certain cases, Idaho Power is pursuing exceptions for its identified 2023, 2024, and 2025 resource needs.

In July 2023, following review by an independent evaluator appointed by the OPUC, OPUC staff, and other intervening parties, the OPUC issued an order approving issuance of Idaho Power's final RFP to procure resources for its anticipated energy and capacity needs in 2026 and 2027.

### Jim Bridger Power Plant Base Rate Adjustment and Recovery

In June 2022, the IPUC issued the Bridger Order approving, with modifications, Idaho Power’s amended application requesting authorization to (1) accelerate depreciation for the Jim Bridger plant, to allow the coal-related plant assets to be fully depreciated and recovered by December 31, 2030, (2) establish a balancing account to track the incremental costs, benefits, and required regulatory accounting associated with ceasing participation in coal-fired operations at the Jim Bridger plant, and (3) increase customer rates related to the associated incremental annual levelized revenue requirement. The Bridger Order and associated accounting are described in Note 3 – “Regulatory Matters” to the condensed consolidated financial statements included in this report. Idaho Power plans to cease participation in all coal-related operations at the Jim Bridger plant by 2028.

### Wildfire Mitigation Cost Deferral

In June 2021, the IPUC authorized Idaho Power to defer for future amortization incremental O&M and depreciation expense of certain capital investments necessary to implement the company's WMP. The IPUC also authorized Idaho Power to record these deferred expenses as a regulatory asset until the company can request amortization of the deferred costs in a future IPUC proceeding, at which time the IPUC will have the opportunity to review actual costs and determine the amount of prudently incurred costs that Idaho Power can recover through retail rates. In its 2021 application with the IPUC, Idaho Power projected spending approximately $47 million in incremental wildfire mitigation-related O&M and roughly $35 million in wildfire mitigation system-hardening incremental capital expenditures over a five-year period. The IPUC authorized a deferral period of five years, or until rates go into effect after Idaho Power's next general rate case, whichever is first. As of September 30, 2023, Idaho Power’s deferral of Idaho-jurisdiction costs related to the WMP was $45.4 million.

During the 2021 and 2022 wildfire seasons, Idaho Power identified needs for expanded mitigation measures by gaining additional insights and knowledge on wildfires and wildfire mitigation activities. In October 2022, Idaho Power filed an updated WMP with the IPUC along with an application requesting authorization to defer an estimated $16 million of newly identified incremental costs expected to be incurred between 2022 and 2025 associated with expanded wildfire mitigation efforts. In March 2023, the IPUC approved Idaho Power's updated WMP and request to defer additional incremental costs.

### Large Customer Rate Proceedings

*Brisbie, LLC Data Center:* In April 2023, the IPUC approved an arrangement, modeled after the Clean Energy Your Way program as described in the 2022 Annual Report in Part II, Item 7 - "Regulatory Matters," under which a new large load customer, Brisbie, LLC (Brisbie), a wholly-owned subsidiary of Meta Platforms, Inc., would purchase from Idaho Power energy for a new 960,000 square-foot enterprise data center. The energy to be purchased by Brisbie is anticipated to be generated by a to-be-constructed 200-MW solar facility pursuant to a long-term power purchase agreement between Idaho Power and a third party. The solar facility is scheduled to begin operating as early as March 2025.

In May 2023, the IPUC issued an order approving, with modifications, a special contract for electric service for Brisbie for the new data center. Idaho regulations require any utility customer with an average load exceeding 20 MW to enter into a special contract with its electric provider. Brisbie, in addition to its large load service requirements in excess of 20 MW, has a sustainability objective to support 100 percent of its operations with new renewable resources. Under the special contract, Idaho Power expects to procure enough renewable resources to support 100 percent of Brisbie's operations on an annual basis with new renewable resources. The modified special contract and related rate schedule were approved by the IPUC in October 2023.

*Micron Dedicated Renewable Resource*: In August 2022, the IPUC issued an order approving, with modifications, Idaho Power's application for a revised special contract for electric service between Idaho Power and Micron. The application was modeled after the Clean Energy Your Way program as described in the 2022 Annual Report in Part II, Item 7 - "Regulatory Matters," and included an arrangement under which Micron would purchase from Idaho Power energy generated by a to-be-constructed 40-MW solar facility pursuant to a 20-year power purchase agreement between Idaho Power and a third party. The solar facility began operating in May 2023.

In April 2023, the IPUC issued an order approving Idaho Power's compliance filing of revised electric service rates for Micron that include new energy rates that incorporate the solar generation and compensation for capacity value and excess renewable energy generation.

*Lamb Weston, Inc. Special Contract*: In September 2023, the IPUC issued an order approving Idaho Power's special contract for electric service for an existing large load customer, Lamb Weston, Inc. (Lamb Weston). Idaho Power anticipates Lamb Weston's large load service requirements to exceed 20 MW in the near future.

*Clean Energy Your Way Program*: In August 2023, the IPUC approved Idaho Power's application to expand optional customer clean energy offerings through its new Clean Energy Your Way Program. Specifically, Idaho Power received authority to: (1) rename its existing green power program; (2) maintain and expand procurement options for the renewable energy credits; (3) establish a regulatory framework for a future voluntary subscription green power service program; (4) offer a tailored renewable option for Idaho Power's largest customers; and (5) procure the associated additional resources outside of the IPUC's current competitive procurement requirements.

### Customer-Owned Generation Filing

Customer-owned generation enables customers to install solar panels or other on-site energy-generating resources and connect them to Idaho Power’s grid. If a customer requires more energy than its system generates, it uses energy supplied by Idaho Power’s grid and infrastructure. If a customer's system generates more energy than the customer uses, the energy is transferred to the grid and Idaho Power applies a corresponding kWh credit to the customer’s bill. In May 2018, the IPUC issued an order authorizing the creation of two new customer classes for residential and small commercial customers who install their own on-site generation, with no change to pricing or compensation. Idaho Power has initiated several cases with the IPUC related to studying the costs and benefits of customer-owned generation on Idaho Power’s system, and exploring potential modifications to the customer-owned generation pricing structure. In December 2019 and February 2020, the IPUC issued orders directing Idaho Power to (1) complete additional studies related to the costs and benefits of customer generation before changes to the compensation structure are implemented, and (2) continue to allow residential and small commercial customers with on-site generation installed prior to December 20, 2019, to be subject to the compensation and billing structure in place on that date until December 20, 2045. In December 2020, the IPUC issued an order establishing a 25-year grandfathering term for large commercial, industrial, and irrigation customers, similar to the terms approved for the residential and small commercial customer classes.

In June 2022, as directed by the IPUC, Idaho Power filed a comprehensive study on the costs and benefits of on-site generation based on the IPUC’s study framework findings and conclusions, and in December 2022, the IPUC issued an order that acknowledged Idaho Power's study and directed Idaho Power to file a new case requesting to implement changes to the structure and design of its on-site generation program. In May 2023, Idaho Power filed a new case as directed by the IPUC, requesting the IPUC to implement changes for non-grandfathered customers starting January 1, 2024, including: (1) a change from net monthly to real-time net billing, which would better measure customers’ actual reliance on the grid; (2) a change in the excess exported energy credit from a kWh credit ranging in value of 5 to 12 cents, depending on the customer class, to a time-differentiated financial bill credit ranging from approximately 5 to 20 cents per kWh that would be updated annually; and (3) a modification to the eligibility cap for large commercial, industrial, and irrigation customers. As of the date of this report, the IPUC's determination in this matter is pending.

### Renewable and Other Energy Contracts

Idaho Power has contracts for the purchase of electricity produced by third-party owned generation facilities, most of which produce energy with the use of renewable generation sources such as wind, solar, biomass, small hydropower, and geothermal. The majority of these contracts are entered into as mandatory purchases under PURPA. As of September 30, 2023, Idaho Power had contracts to purchase energy from 129 online PURPA projects. An additional five contracts are with online non-PURPA projects, including the Elkhorn Valley wind project with a 101-MW nameplate capacity, the Jackpot Solar project with a 120-MW nameplate capacity, and the Black Mesa solar project with a 40-MW nameplate capacity.

The following table sets forth, as of September 30, 2023, the resource type and nameplate capacity of Idaho Power's signed agreements for power purchases from PURPA and non-PURPA generating facilities. These agreements have original contract terms ranging from one to 35 years.

| Resource Type PURPA: | Online (MW) | Under Contract but not yet Online (MW) | Total Projects under Contract (MW) |
| --- | ---: | ---: | ---: |
| Wind | 625 | — | 625 |
| Solar | 316 | 74 | 390 |
| Hydropower | 150 | 1 | 151 |
| Other | 43 | — | 43 |
| Total | 1,134 | 75 | 1,209 |
| **Non-PURPA:** |  |  |  |
| Wind | 101 | — | 101 |
| Geothermal | 35 | — | 35 |
| Solar | 160 | 300 | 460 |
| Total | 296 | 300 | 596 |

The PURPA-qualifying facility projects not yet online include one hydropower project that is scheduled to be online in 2023, and one PURPA-qualifying facility solar project expected to be online in 2024. The table above also includes two PURPA-qualifying facility solar projects not yet online, totaling 71 MW, for which Idaho Power expects to terminate the existing agreements by January 31, 2024, due to non-performance by the contractual counterparties. Two non-PURPA solar projects, for 100 MW and 200 MW, are scheduled to be online in 2024 and 2025, respectively. In August 2023, the IPUC issued an order approving Idaho Power's agreement with the 100 MW solar project and granting Idaho Power a certificate of public convenience and necessity to acquire a total of 72 MW of new dispatchable energy storage to meet identified capacity deficiencies in 2024.

In April 2023, Idaho Power entered into an agreement, pending regulatory approval, with a 150-MW battery storage facility, scheduled to be online in June 2025. Under the agreement, the facility would provide 150 MW of capacity on Idaho Power’s system for a period of 20 years, and Idaho Power would have the exclusive right to dispatch and use the charging and discharging energy in exchange for a monthly payment. In May 2023, Idaho Power filed an application with the IPUC requesting an order approving the agreement and acknowledging the lease accounting necessary to facilitate the transaction, and that the resulting expenses are prudently incurred for ratemaking purposes. As part of that same application, Idaho Power requested that the IPUC issue an order granting Idaho Power a CPCN to acquire a total of 101 MW of new dispatchable energy storage to meet identified capacity deficiencies in both 2024 and 2025. As of the date of this report, the IPUC's decision in these matters is pending.

### Relicensing of Hydropower Projects

***HCC Relicensing:*** In connection with Idaho Power's major efforts to relicense the HCC, Idaho Power's largest hydropower complex, as described in more detail in the 2022 Annual Report in Part II, Item 7 - "Regulatory Matters," Idaho Power submitted to the FERC in July 2020 its supplement to the final license application. The supplement incorporated the settlement agreement reached between Idaho and Oregon on the CWA Section 401 certifications, which precipitated the states issuing final CWA Section 401 certifications in May 2019. The states of Idaho and Oregon also submitted the CWA Section 401 certifications to the FERC as part of the relicensing process. The supplement included feedback on proposed modifications of the 2007 final EIS for the HCC, as well as an updated cost analysis of the HCC and a request that the FERC issue a 50-year license and initiate a supplemental National Environmental Policy Act (NEPA) process at the FERC. Idaho Power prepared draft biological assessments in consultation with the USFWS and the NMFS and filed those with the FERC in October 2020. The draft biological assessments provide information to the USFWS and the NMFS that is necessary to issue their biological opinion as required under the ESA. Since December 2020, Idaho Power has responded to sixteen additional information requests issued by the FERC staff to aid in the FERC's analysis.

In June 2022, the FERC issued a Notice of Intent to prepare a supplemental EIS in accordance with NEPA. The FERC indicated that the supplemental EIS would address the new and revised measures proposed by the CWA 401 certification settlement, the conditions contained in the Oregon and Idaho water quality certifications, and the information provided in the draft biological assessments. The FERC also reinitiated informal consultation with the USFWS and the NMFS under section 7 of the ESA. In October 2023, the FERC issued a notice revising the schedule for completing the supplemental EIS. Under the revised schedule, the draft supplemental EIS is targeted to be published in February 2024 and the final supplemental EIS in November 2024.

Idaho Power estimates that the annual costs it will incur to obtain a new long-term license for the HCC, including AFUDC, are likely to range from $30 million to $40 million until issuance of the license. Subsequent to the issuance of a new license, Idaho Power expects to incur increased annual operating and maintenance costs to comply with the requirements of any new license and would seek to recover those increased costs through regulatory proceedings. Although Idaho Power is unable to predict the exact timing that the FERC will issue a new license or the ultimate capital investment and ongoing operating and maintenance costs Idaho Power will incur in complying with any new license, as of the date of this report, Idaho Power believes issuance of a new HCC license by the FERC will be in 2025 or thereafter.

Relicensing costs for Idaho Power's hydropower projects are recorded as construction work in progress until new multi-year licenses are issued by the FERC, at which time the charges are transferred to electric plant in service. Idaho Power expects to seek recovery of relicensing costs and costs related to a new long-term license through the regulatory process. Relicensing costs of $450 million (including AFUDC) for the HCC were included in construction work in progress at September 30, 2023. As of the date of this report, the IPUC authorizes Idaho Power to include in its Idaho jurisdiction rates $8.8 million of AFUDC annually relating to the HCC relicensing project. Collecting these amounts currently will reduce future collections when HCC relicensing costs are approved for recovery in base rates. As of September 30, 2023, Idaho Power's regulatory liability for collection of AFUDC relating to the HCC was approximately $224 million.

***American Falls Relicensing:*** In April 2020, the FERC formally initiated the relicensing of the American Falls hydropower facility, which is Idaho Power's largest hydropower facility outside of the HCC, with a generating capacity of 92.3 MW. Idaho Power owns the generation facility but not the structural dam itself, which is owned by the U.S. Bureau of Reclamation. The FERC recognized Idaho Power’s pre-application document, including a proposed process plan and schedule, and recognized Idaho Power’s intent to file an application for a license. In February 2023, following the public comment period on its draft license application, Idaho Power filed a final license application with the FERC. In July 2023, FERC issued a notice that Idaho Power’s final license application was accepted for filing and solicited motions to intervene and protest. In September 2023, FERC issued a request for comments to determine the resource issues that should be addressed in the environmental analysis and identify reasonable alternatives to the proposed action that FERC should evaluate under the NEPA framework. The relicensing has begun the process of informal ESA Section 7 consultation with the USFWS and Section 106 of the National Historic Preservation Act consultation with the Idaho State Historic Preservation Office.

In September 2023, Idaho Power filed an application for CWA Section 401 water quality certification with the IDEQ. The IDEQ acknowledged receipt of the Section 401 water quality certification application and informed Idaho Power that it anticipates preparing a draft certification and will seek public comment once the draft is complete. American Falls' current license expires in 2025, and as of the date of this report, Idaho Power expects the FERC to issue a new license for this facility concurrent with or prior to the existing license expiration.

### ENVIRONMENTAL MATTERS

### Overview

Idaho Power is subject to a broad range of federal, state, regional, and local laws and regulations designed to protect, restore, and enhance the environment, including the Clean Air Act (CAA), the CWA, the Resource Conservation and Recovery Act, the Toxic Substances Control Act, the Comprehensive Environmental Response, Compensation and Liability Act, and the ESA, among other laws. These laws are administered by a number of federal, state, and local agencies. In addition to imposing continuing compliance obligations and associated costs, these laws and regulations provide authority to regulators to levy substantial penalties for noncompliance, injunctive relief, and other sanctions. Idaho Power's two co-owned coal-fired power plants and three wholly-owned natural gas-fired combustion turbine power plants are subject to many of these regulations. Idaho Power's 17 hydropower projects are also subject to a number of water discharge standards and other environmental requirements.

Compliance with current and future environmental laws and regulations may:

- increase the operating costs of generating plants;
- increase the construction costs and lead time for new facilities;
- require the modification of existing generating plants, which could result in additional costs;
- require the curtailment, fuel-switching, or shut-down of existing generating plants;
- reduce the output from current generating facilities; or
- require the acquisition of alternative sources of energy or storage technology, increased transmission wheeling, or construction of additional generating facilities, which could result in higher costs.

Current and future environmental laws and regulations could significantly increase the cost of operating fossil fuel-fired generation plants and constructing new generation and transmission facilities, in large part through the substantial cost of permitting activities and the required installation of additional pollution control devices. In many parts of the United States, some higher-cost, high-emission coal-fired plants have ceased operation or the plant owners have announced a near-term cessation of operation, as the cost of compliance makes the plants uneconomical to operate. The decision to cease operation of the Boardman power plant in 2020 was based in part on the significant cost of compliance with environmental laws and regulations. The decision to pursue an end to participation in coal-fired operations at the Valmy plant was also based primarily on the economics of continuing coal-fired generation at the plant. Beyond increasing costs generally, these environmental laws and regulations could affect IDACORP's and Idaho Power's results of operations and financial condition if the costs associated with these environmental requirements and early plant retirements cannot be fully recovered in rates on a timely basis.

Part I - "Business - Utility Operations - Environmental Regulation and Costs" in the 2022 Annual Report, includes a summary of Idaho Power's expected capital and operating expenditures for environmental matters during the period from 2023 to 2025. Given the uncertainty of future environmental regulations and technological advances, there is uncertainty around near-term estimates, and Idaho Power is also unable to predict its environmental-related expenditures beyond 2025, though they could be substantial.

A summary of notable environmental matters (including conditions and events associated with climate change) impacting, or expected to potentially impact, IDACORP and Idaho Power is included in Part II, Item 7 - "MD&A - Environmental Issues" and "MD&A - Liquidity and Capital Resources - Capital Requirements - Environmental Regulation Costs" in the 2022 Annual Report. Recent developments in certain environmental matters relevant to Idaho Power are described below.

### Endangered Species Act Matters

***Changes to the Endangered Species Act:*** The listing of a species, or changes to the critical habitat designations, of fish, wildlife, or plants as threatened or endangered under the ESA, and the associated mitigation policies, may have an adverse impact on Idaho Power's ability to construct power supply, transmission, or distribution facilities or relicense or operate its hydropower facilities. In May 2023, the USFWS published a revised Mitigation Policy and a revised ESA Compensatory Mitigation Policy (Revised Policies) which together establish fundamental mitigation principles and compensatory mitigation standards and application guidance through implementation of the ESA. The Revised Policies scale back the mitigation goal from the previous policies by including a nexus and proportionality principle to reinforce that government-required mitigation measures must have a clear connection with the anticipated effects of the proposed land use. As of the date of this report, Idaho Power is uncertain to what extent the Revised Policies may impact its obligations in permitting infrastructure, including relicensing its hydropower facilities, and transmission lines.

### Clean Air Act Matters

***Good Neighbor Plan***: In June 2023, the EPA published the final rule under the CAA called the Federal "Good Neighbor Plan" for the 2015 Ozone National Ambient Air Quality Standards (Good Neighbor Plan), which took effect on August 4, 2023. The Good Neighbor Plan establishes NOx emissions budgets requiring fossil fuel-fired power plants to participate in an allowance-based ozone season trading program. The EPA's final rule temporarily excludes power plants located in Wyoming, while the EPA reevaluates the proposed disapproval of the Wyoming state implementation plan (SIP). In August 2023, the EPA published a proposed approval of the Wyoming SIP, finding that the EPA’s updated modeling demonstrated that Wyoming’s determination that no additional controls are required to address interstate transport for the 2015 zone National Ambient Air Quality Standards was reasonable. In September 2023, Idaho Power submitted comments in support of EPA’s proposed approval of the Wyoming SIP. Refer to Part II, Item 7 - "MD&A - Environmental Issues" in the 2022 Annual Report for more information on SIPs.

In July 2023, the Ninth Circuit Court of Appeals issued a stay halting application of the Good Neighbor Plan in Nevada pending a hearing on the merits of an appeal challenging the EPA's disapproval of Nevada's SIP. In light of the court's ruling, in September 2023, the EPA issued an interim final rule indefinitely suspending the implementation of the Good Neighbor Plan in Nevada. As of the date of this report, Idaho Power continues to evaluate the specific impacts the Good Neighbor Plan could have on its operations at the Valmy and Jim Bridger plants. If the Good Neighbor Plan is implemented in Nevada and Wyoming, Idaho Power anticipates that, under certain conditions, it could reduce the ability to use the full available output, or require the purchase of allowances in order to utilize the full available output, at the Valmy and Jim Bridger plants.

***Regulation of Greenhouse Gas Emissions***: In May 2023, the EPA released a proposed rule under Section 111 of the CAA to regulate greenhouse gas emissions from fossil fuel-fired power plants. The proposed rule would impose significant greenhouse gas (GHG) emissions reductions on new and existing natural gas-fired generating units and coal plants expected to be operational in 2040 and beyond. The proposed rule would require states to submit plans to the EPA to implement standards for existing sources within 24 months of the effective date of the emission guidelines. In August 2023, Idaho Power submitted comments to the EPA requesting it to maintain certain jurisdictional limits published in the rule and create flexibility for state plans to account for system reliability. As of the date of this report, Idaho Power continues to evaluate the specific impacts the proposed rule could have on its operations at its three natural gas facilities, as well as the Valmy and Jim Bridger plants. If the proposed rule is implemented, Idaho Power anticipates that the GHG emissions reductions may under certain circumstances only be achievable by reducing unit runtimes.

### Clean Water Act Matters

***Definition of “Waters of the United States” Under the CWA***: The definition of "waters of the United States" is fundamental to the application of the CWA because only those bodies of water designated as WOTUS are protected from unlawful discharge of pollutants under the CWA. In May 2023, the U.S. Supreme Court issued a decision defining WOTUS under the CWA and providing nationwide clarity of the federal government’s jurisdiction over WOTUS. The decision restricts the federal government's ability to regulate wetlands that do not have a continuous surface connection with a navigable water. While not addressed in the opinion, ephemeral streams and other water bodies that are not relatively permanent would also not be jurisdictional under the May 2023 decision. The new definition of WOTUS from the Supreme Court should not alter how the CWA applies to most of Idaho Power's facilities, including its hydropower plants. As a result, Idaho Power does not expect the new definition to materially impact Idaho Power's operations or financial condition.

***CWA Permitting***: Idaho Power's hydropower generation facilities are subject to compliance and permitting obligations under the CWA. Idaho Power has been engaged for several years with the EPA, and is now engaged with the IDEQ, regarding Idaho Power's CWA permitting obligations and compliance status for those facilities. Idaho Power has in the past, and expects in the future, to incur costs associated with those permitting and compliance obligations, but as of the date of this report, Idaho Power is unable to estimate with any reasonable certainty those costs. Idaho Power also expects to incur additional costs associated with the relicensing of its hydropower facilities, as discussed elsewhere in this report.

In June 2022, Idaho Power and the IDEQ entered into a consent judgment in the district courts for the third, fourth, fifth, and sixth judicial districts of the State of Idaho to resolve a National Pollutant Discharge Elimination System permitting issue related to 15 of Idaho Power’s hydropower projects that required Idaho Power to pay a $1.1 million fine, implement interim measures for compliance, and ultimately submit applications for new permits at each of the dams subject to the consent judgment. Due to a misinterpretation of law, the EPA cancelled water discharge permits in the mid-1990’s, and Idaho Power recently determined that those permits are applicable for operation of the dams. However, Idaho Power believes that the dams would have been in compliance with the earlier permits had they remained in place. As of the date of this report, Idaho Power has submitted new permit applications for ten of the dams and anticipates completing all submissions by June 2024.

### Invasive Species Management

Quagga mussels are an invasive species which have not been present in the Snake River system historically. Quagga mussel infestations can foul up irrigation, hydropower, and water delivery facilities and increase the costs to maintain such facilities. In September 2023, a larval form of quagga mussels and one adult quagga mussel were detected in the mid-Snake River near Twin Falls in Idaho Power's service area by the Idaho State Department of Agriculture (ISDA). As a result, in October 2023, ISDA treated approximately six miles of the Snake River, which includes Idaho Power's Twin Falls and Shoshone Falls hydropower facilities, using a copper-based, EPA-approved treatment called Natrix to eradicate quagga mussels.

If the treatment is unsuccessful, and a quagga mussel infestation occurs, it may result in increased other O&M costs for mitigation efforts and other adverse impacts for Idaho Power's operation of its hydropower facilities in any infested areas. As of the date of this report, Idaho Power cannot predict the extent to which the Natrix treatment will be successful in eradicating quagga mussels from the Snake River, the extent of the treatment’s impact to the river and its inhabitants, or the potential increase in other O&M expenses related to quagga mussel mitigation efforts.

### OTHER MATTERS

### Critical Accounting Policies and Estimates

IDACORP's and Idaho Power's discussion and analysis of their financial condition and results of operations are based upon their condensed consolidated financial statements, which have been prepared in accordance with generally accepted accounting principles. The preparation of these financial statements requires IDACORP and Idaho Power to make estimates and judgments that affect the reported amounts of assets, liabilities, revenues, and expenses and related disclosure of contingent assets and liabilities. On an ongoing basis, IDACORP and Idaho Power evaluate these estimates, including those estimates related to rate regulation, retirement benefits, contingencies, asset impairment, income taxes, unbilled revenues, and bad debt. These estimates are based on historical experience and on other assumptions and factors that are believed to be reasonable under the circumstances, and are the basis for making judgments about the carrying values of assets and liabilities that are not readily apparent from other sources. IDACORP and Idaho Power, based on their ongoing reviews, make adjustments when facts and circumstances dictate.

IDACORP’s and Idaho Power’s critical accounting policies are reviewed by the audit committees of the boards of directors. These policies have not changed materially from the discussion of those policies included under "Critical Accounting Policies and Estimates" in the 2022 Annual Report.

### Recently Issued Accounting Pronouncements

There have been no recently issued accounting pronouncements that have had or are expected to have a material impact on IDACORP's or Idaho Power's condensed consolidated financial statements.

## Market risk

As filed, 5,753 characters.

IDACORP is exposed to market risks, including changes in interest rates, changes in commodity prices, credit risk, and equity price risk. The following discussion summarizes material changes in these risks since December 31, 2022, and the financial instruments, derivative instruments, and derivative commodity instruments sensitive to changes in interest rates, commodity prices, and equity prices that were held at September 30, 2023. IDACORP has not entered into any of these market-risk-sensitive instruments for trading purposes.

### Interest Rate Risk

IDACORP manages interest expense and short- and long-term liquidity through a combination of fixed rate and variable rate debt. Generally, the amount of each type of debt is managed through market issuance, but interest rate swap and cap agreements with highly-rated financial institutions may be used to achieve the desired combination.

***Variable Rate Debt:*** As of September 30, 2023, IDACORP had no net variable rate debt, as the carrying value of short-term investments exceeded the carrying value of outstanding variable rate debt.

***Fixed Rate Debt:*** As of September 30, 2023, IDACORP had $2.8 billion in fixed rate debt, with a fair value of approximately $2.4 billion. These instruments are fixed rate and, therefore, do not expose the companies to a loss in earnings due to changes in market interest rates. However, the fair value of these instruments would increase by approximately $297 million if market interest rates were to decline by one percentage point from their September 30, 2023, levels.

### Commodity Price Risk

IDACORP's exposure to changes in commodity prices is related to Idaho Power's ongoing utility operations that produce electricity to meet the demand of its retail electric customers. These changes in commodity prices are mitigated in large part by Idaho Power's Idaho and Oregon power cost adjustment mechanisms. To supplement its supply resources and balance its supply of power with the demand of its retail customers, Idaho Power participates in the wholesale marketplace. IDACORP's commodity price risk as of September 30, 2023, had not changed materially from that reported in Item 7A of the 2022 Annual Report. Information regarding Idaho Power’s use of derivative instruments to manage commodity price risk can be found in Note 11 - "Derivative Financial Instruments" to the condensed consolidated financial statements included in this report.

### Credit Risk

IDACORP is subject to credit risk based on Idaho Power's activity with market counterparties. Idaho Power is exposed to this risk to the extent that a counterparty may fail to fulfill a contractual obligation to provide energy, purchase energy, or complete financial settlement for market activities. Idaho Power mitigates this exposure by actively establishing credit limits; measuring, monitoring, and reporting credit risk; using appropriate contractual arrangements; and transferring credit risk through the use of financial guarantees, cash, or letters of credit. Idaho Power maintains a current list of acceptable counterparties and credit limits.

The use of performance assurance collateral in the form of cash, letters of credit, or guarantees is common industry practice. Idaho Power maintains margin agreements relating to its wholesale commodity contracts that allow performance assurance collateral to be requested of and/or posted with certain counterparties. As of September 30, 2023, Idaho Power posted $29 million of performance assurance collateral related to these contracts. Should Idaho Power experience a reduction in its credit rating on Idaho Power's unsecured debt to below investment grade, Idaho Power could be subject to requests by its wholesale counterparties to post additional performance assurance collateral. Counterparties to derivative instruments and other forward contracts could request immediate payment or demand immediate ongoing full daily collateralization on derivative instruments and contracts in net liability positions. Based upon Idaho Power's energy and fuel portfolio and then-existing market conditions, as of September 30, 2023, the amount of additional collateral that could have been requested upon a downgrade to below investment grade was approximately $10 million. To minimize capital requirements, Idaho Power actively monitors the portfolio exposure and the potential exposure to additional requests for performance assurance collateral calls through sensitivity analysis.

IDACORP's credit risk related to uncollectible accounts, net of amounts reserved, as of September 30, 2023, had not changed materially from that reported in Item 7A of the 2022 Annual Report, except as disclosed in Note 4 - "Revenues" to the condensed consolidated financial statements included in this report. Additional information regarding Idaho Power’s management of credit risk and credit contingent features can be found in Note 11 - "Derivative Financial Instruments" to the condensed consolidated financial statements included in this report.

### Equity Price Risk

IDACORP is exposed to price fluctuations in equity markets, primarily through Idaho Power's defined benefit pension plan assets, a mine reclamation trust fund owned by an equity-method investment of Idaho Power, and other equity security investments at Idaho Power. The equity securities held by the pension plan and in such accounts are diversified to achieve broad market participation and reduce the impact of any single investment, sector, or geographic region. Idaho Power has established asset allocation targets for the pension plan holdings, which are described in Note 11 - "Benefit Plans" to the consolidated financial statements included in the 2022 Annual Report.

## Controls and procedures

As filed, 1,203 characters.

### Disclosure Controls and Procedures

***IDACORP:*** The Chief Executive Officer and the Chief Financial Officer of IDACORP, based on their evaluation of IDACORP’s disclosure controls and procedures (pursuant to Rule 13a-15(b) of the Securities Exchange Act of 1934 (Exchange Act)) as of September 30, 2023, have concluded that IDACORP’s disclosure controls and procedures (as defined in Rule 13a-15(e) of the Exchange Act) are effective as of that date.

***Idaho Power:*** The Chief Executive Officer and the Chief Financial Officer of Idaho Power, based on their evaluation of Idaho Power’s disclosure controls and procedures (pursuant to Rule 13a-15(b) of the Exchange Act) as of September 30, 2023, have concluded that Idaho Power’s disclosure controls and procedures (as defined in Rule 13a-15(e) of the Exchange Act) are effective as of that date.

### Changes in Internal Control over Financial Reporting

There have been no changes in IDACORP's or Idaho Power's internal control over financial reporting during the quarter ended September 30, 2023, that have materially affected, or are reasonably likely to materially affect, IDACORP's or Idaho Power's internal control over financial reporting.

## Risk factors

As filed, 591 characters.

The factors discussed in Part I - Item 1A - "Risk Factors" in the 2022 Annual Report, could materially affect IDACORP’s and Idaho Power's business, financial condition, or future results. In addition to those risk factors and other risks discussed in this report, see "Cautionary Note Regarding Forward-Looking Statements" in this report for additional factors that could have a significant impact on IDACORP's or Idaho Power's operations, results of operations, or financial condition and could cause actual results to differ materially from those anticipated in forward-looking statements.

Filed Nov 2, 2023.
Source: SEC EDGAR, the filing index for accession 0001057877-23-000059. Last ingested by Listed: Nov 3, 2026, 19:46 ET. No prices; not investment advice.