# Novagold Resources Inc: Form 10-Q for the period ended Aug 31, 2016

- Company: [Novagold Resources Inc](/companies/ng.md) (CIK 1173420)
- Form: 10-Q
- Filed: 2016-10-04
- Accepted by EDGAR: Oct 4, 2016, 21:09 ET
- Period: 2016-08-31
- Accession: 0001102624-16-003447
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1173420/000110262416003447/novagold10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1173420/000110262416003447/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2016-08-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Operating income | 3 months, 2016-06-01 to 2016-08-31 | −$6.4m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2015-12-01 to 2016-08-31 | −$23.3m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2016-06-01 to 2016-08-31 | $1.2m | us-gaap:InterestExpense |
| Interest expense | 9 months, 2015-12-01 to 2016-08-31 | $3.4m | us-gaap:InterestExpense |
| Income tax | 3 months, 2016-06-01 to 2016-08-31 | $74.0k | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2015-12-01 to 2016-08-31 | $153.0k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2016-06-01 to 2016-08-31 | −$7.4m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2015-12-01 to 2016-08-31 | −$26.5m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2016-06-01 to 2016-08-31 | −$0.02 | us-gaap:EarningsPerShareBasicAndDiluted |
| Diluted EPS | 9 months, 2015-12-01 to 2016-08-31 | −$0.08 | us-gaap:EarningsPerShareBasicAndDiluted |
| Operating cash flow | 3 months, 2016-06-01 to 2016-08-31 | −$535.0k | us-gaap:NetCashProvidedByUsedInOperatingActivitiesContinuingOperations |
| Operating cash flow | 9 months, 2015-12-01 to 2016-08-31 | −$10.4m | us-gaap:NetCashProvidedByUsedInOperatingActivitiesContinuingOperations |
| Cash and equivalents | at 2016-08-31 | $28.5m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2016-08-31 | $110.0m | us-gaap:AssetsCurrent |
| Total assets | at 2016-08-31 | $420.4m | us-gaap:Assets |
| Current liabilities | at 2016-08-31 | $2.7m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2016-08-31 | $107.2m | us-gaap:Liabilities |
| Long-term debt | at 2016-08-31 | $83.7m | us-gaap:LongTermDebtNoncurrent |
| Shareholders' equity | at 2016-08-31 | $313.2m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 17,225 characters.

*In Management’s Discussion and Analysis of Financial Condition and Results of Operations, “NOVAGOLD”, the “Company”, “we,” “us” and “our” refer to NOVAGOLD RESOURCES INC. and its consolidated subsidiaries. The following discussion and analysis of our financial condition and results of operations constitutes management’s review of the factors that affected our financial and operating performance for the three and nine month periods ended August 31, 2016 and 2015. This discussion should be read in conjunction with the condensed consolidated interim financial statements and notes thereto contained elsewhere in this report and our Annual Report on Form 10-K for the year ended November 30, 2015, as well as other information we file with the Securities and Exchange Commission on EDGAR at www.sec.gov and with Canadian Securities Administrators on SEDAR at www.sedar.com.*

### Overview

Our operations primarily relate to the delivery of project milestones, including the achievement of various technical, environmental, sustainable development, economic and legal objectives, obtaining necessary permits, preparation of engineering designs and the financing to fund these objectives.

Our goals for 2016 include:

- Advance the Donlin Gold project toward a construction decision.
- Advance Galore Creek mine planning and project design.
- Evaluate opportunities to monetize the value of Galore Creek.
- Maintain a healthy balance sheet.
- Maintain an effective corporate social responsibility program.

### Third quarter highlights

#### Advancement of the Donlin Gold project

In the third quarter of 2016, permitting activities continued at Donlin Gold and were focused on advancing major permits and approvals with State and Federal agencies as well as providing the U.S. Army Corps of Engineers (the “Corps”), the lead agency for the Donlin Gold Environmental Impact Statement (EIS), with requested input and information. The EIS is required by the National Environmental Policy Act (NEPA), the act that governs the process by which most major projects in the United States are evaluated. The EIS is also, in large part, a determining factor in the overall permitting timeline which commenced in 2012 for Donlin Gold. This document is comprised of four main sections which:

- Outline of the purpose and need for the development of the proposed mine and the benefit it would bring to the stakeholders of Donlin Gold’s Alaska Native Corporation partners, Calista Corporation and The Kuskokwim Corporation (TKC).
- Identify and analyze a reasonable range of alternatives to the mine development proposed by Donlin Gold which comprise variations on certain mine site facility designs, as well as local transportation and power supply options.
- Prepare an environmental analysis of the proposed action and reasonable alternatives (including a no action alternative), which identifies and characterizes the potential physical, biological, social, and cultural impacts relative to the existing baseline conditions. This portion constitutes the most extensive part of the EIS.
- Describe potential mitigation measures intended to reduce or eliminate the environmental impacts described in the impact analysis section.

The Corps filed the draft EIS in November 2015. Following the filing of the draft EIS, the Corps conducted 17 meetings in communities across the Yukon-Kuskokwim (Y-K) region and in Anchorage. The six-month public comment period for the draft EIS was completed on May 31, 2016. The public comment meetings gave the Corps an opportunity to present an overview of the draft EIS, which evaluates the potential environmental, social and economic impacts of the proposed project together with alternatives. The meetings also served as an excellent platform for stakeholders to ask questions and provide comments on the draft EIS. The Corps received approximately 600 separate comment submittals, including letters and public statements from Alaska Native Corporations, business groups, communities, the State of Alaska and other Federal agencies. The Corps is reviewing the comments to assess what studies or work would be required to prepare the final EIS. The Corps is working to establish a target release date for the final EIS, which is required before the Corps can issue a record of decision on Donlin Gold’s Clean Water Act Section 404 (wetland) and 10 (rivers and harbors) permit application. All Donlin Gold EIS documents, including the Corps’ time table for the Donlin Gold EIS process, can be found on their website at www.donlingoldeis.com.

In addition to actively participating in the NEPA process, Donlin Gold continues to advance other major permits and approvals by providing State and Federal agencies with information on major permit applications, including:

- working with the State to advance the review of Donlin Gold’s air quality permit application and preparation of the air quality permit, targeted for issuance in 2017;
- advancing the water discharge permit application and working with the State to advance the review of the integrated waste management permit application and reclamation plan;
- the Corps provided opportunities for public comment on Donlin Gold’s Public Notice CWA Section 404 (wetland)/10 (rivers and harbors) permit application as part of the draft EIS comment period which closed on May 31, 2016;
- Donlin Gold continues to work with State and Federal agencies to advance issuance of all other required permits, including dam safety approvals, pipeline authorizations, water use permits, fish habitat permits, as well as land and shoreline lease and right-of-way approvals.

An extensive list of additional Federal and State government permits and approvals must be obtained before the Donlin Gold project can commence construction. Preparation of the applications for some of these permits and approvals requires additional, more detailed engineering that was not part of the Donlin Gold feasibility study. Completion of this engineering will require a significant investment of funds, time, and other resources by Donlin Gold and its contractors. Also, the Donlin Gold board must approve a construction program and budget before proceeding with the development of the Donlin Gold project. The timing of the required engineering work and the Donlin Gold board’s approval of a construction program and budget, the receipt of all required governmental permits and approvals, and the availability of financing, among other factors, will affect the decision and timing to develop the Donlin Gold project. Among other reasons, project delays could occur as a result of public opposition, requests for additional information or analysis, limitations in agency staff resources during regulatory review and permitting, or project changes made by Donlin Gold.

As the Donlin Gold EIS and permitting processes progress, the owners (Barrick Gold Corporation and NOVAGOLD) are studying ways to further enhance the project’s value and minimize initial capital, such as modular construction techniques, more selective mining methods, automation of certain mining activities and other opportunities. To date, these additional studies have identified opportunities that have the potential to benefit the project when the owners decide to update the feasibility study, which was completed in 2011, and to initiate the engineering work necessary to advance the project design from feasibility level to basic and then detailed engineering. The owners will take all of this work into account before reaching a construction decision.

Our share of cash funding for Donlin Gold was $2.5 million and $7.2 million in the third quarter and first nine months of 2016, respectively, for permitting, community engagement and workforce development efforts. Our 50% share of the 2016 work program is expected to be approximately $9 million. The 2016 work program and budget includes funds to continue to advance the permitting and EIS processes. In addition, Donlin Gold continues to maintain its engagement with communities in the Y-K region.

We record our interest in the Donlin Gold project as an equity investment, which results in our 50% share of Donlin Gold’s expenses being recorded in the income statement as an operating loss. The investment amount recorded on the balance sheet primarily represents unused funds advanced to Donlin Gold.

#### Galore Creek project

In the third quarter of 2016, the Galore Creek Partnership continued to advance technical studies to optimize the project design. Final reports were completed on the first phase of the tunneling evaluation for access and material handling as well as enhancements to the mining, waste rock and water management plans. We expect this effort to further improve the value and marketability of the Galore Creek project, which we continue to be open to monetizing, in whole or in part, to strengthen our balance sheet and to contribute toward the development of the Donlin Gold project.

Our share of cash funding for Galore Creek was $0.2 million and $0.7 million in the third quarter and first nine months of 2016, respectively, for technical studies, care and maintenance, and supporting community initiatives. In 2016, our 50% share of the work program is expected to be approximately $1 million to continue to advance technical studies, support community initiatives and provide site care and maintenance.

We record our interest in the Galore Creek Partnership as an equity investment, which results in our 50% share of expenses being recorded in the income statement as an operating loss. The investment amount recorded on the balance sheet primarily represents the fair value of our investment in the Galore Creek Partnership in 2011, recorded upon completion of the earn-in by Teck Resources Limited, as well as unused funds advanced to the Partnership, all in Canadian dollars, and translated to U.S. dollars at the current exchange rate.

A sustained decline in the long-term copper price is deemed to be an indicator of possible impairment for our investment in the Galore Creek Partnership and our 40% direct interest in the Copper Canyon mineral property. The Canadian dollar is the functional currency for our Canadian operations and therefore we assess whether there has been a potential impairment triggering event related to copper prices in Canadian dollars. In Canadian dollar terms, there has not been a significant decline in the price of copper and therefore is not presently an indicator of possible impairment.

### Outlook

We do not currently generate operating cash flows. At August 31, 2016, we had cash and cash equivalents of $28.5 million and term deposits of $80.0 million. At present, we believe that these balances are sufficient to support our operations for the next twelve months and to cover the anticipated funding at the Donlin Gold and Galore Creek projects, in addition to general and administrative costs through completion of permitting at the Donlin Gold project. Additional capital may be necessary if the owners decide to update the feasibility study and initiate the engineering work necessary to advance the project design from feasibility level to basic and then to detailed engineering. Once a construction decision is reached, further capital will be needed. Future financings to fund construction are anticipated through a combination of debt financing, equity financing, project specific debt, or other means. Our continued operations are dependent on our ability to obtain additional financing or to generate future cash flows. However, there can be no assurance that we will be successful in our efforts to raise additional capital. For further information, see the risk factors in our Annual Report on Form 10-K for the year ended November 30, 2015, as filed with the SEC and the Canadian Securities Regulators on January 27, 2016.

For the full year, we expect to spend approximately $23 million; $2 million lower than our original forecast. We expect to spend approximately $10 million to fund our share of expenditures at the Donlin Gold and Galore Creek projects; $11 million for general and administrative costs, and $2 million for working capital and other corporate purposes. A total of $18 million was expended as of August 31, 2016.

### Summary of Consolidated Financial Performance

*($ thousands, except per share)*

|  | Three months ended August 31, 2016 | 2015 | Nine months ended August 31, 2016 | 2015 |
| --- | ---: | ---: | ---: | ---: |
| Loss from operations | $(6,422) | $(6,579) | $(23,343) | $(25,111) |
| Net loss | $(7,381) | $(6,301) | $(26,496) | $(24,784) |
| Net loss per common share |  |  |  |  |
| Basic and diluted | $(0.02) | $(0.02) | $(0.08) | $(0.08) |

### Results of Operations

#### Third quarter 2016 compared to 2015

Loss from operations decreased from $6.6 million in 2015 to $6.4 million in 2016, primarily due to a reduction of our share of losses at the Donlin Gold project, partially offset by a gain on the sale of equipment at Galore Creek in the third quarter of 2015.

Net loss increased from $6.3 million ($0.02 per share) in 2015 to $7.4 million ($0.02 per share) in 2016, primarily due to a $1.1 million foreign exchange gain in the third quarter of 2015. The U.S. dollar significantly strengthened in relation to the Canadian dollar during the third quarter of 2015 and a foreign exchange gain was realized by the Canadian parent company on its cash denominated in U.S. dollars.

#### First nine months 2016 compared to 2015

Loss from operations decreased from $25.1 million in 2015 to $23.3 million in 2016, primarily due to a reduction of our share of losses at the Donlin Gold project, as 2016 activities continued to focus on permitting and the EIS processes.

Net loss increased from $24.8 million ($0.08 per share) in 2015 to $26.5 million ($0.08 per share) in 2016, primarily due to a $4.4 million foreign exchange gain in 2015, partially offset by the reduction in loss from operations and lower interest expense. The U.S. dollar significantly strengthened in relation to the Canadian dollar during the first nine months of 2015 and a foreign exchange gain was realized by the Canadian parent company on its cash denominated in U.S. dollars.

### Liquidity, Capital Resources and Capital Requirements

| Three months ended August 31, ($ thousands) 2016 | 2015 | Nine months ended August 31, 2016 | 2015 |
| --- | ---: | ---: | ---: |
| Cash used in operations $(535) | $(1,755) | $(10,419) | $(9,913) |
| Cash used to fund Donlin Gold and Galore Creek $(2,742) | $(2,757) | $(7,935) | $(9,219) |
| Net cash provided from term deposits $— | $— | $5,000 | $10,000 |
| Cash used in financing activities $— | $— | $— | $(15,829) |
|  | At | At |  |
| ($ thousands) | August 31, 2016 | November 30, 2015 | Change |
| Cash and cash equivalents | $28,455 | $41,731 | $(13,276) |
| Term deposits | $80,000 | $85,000 | $(5,000) |

#### Third quarter 2016 compared to 2015

Cash and cash equivalents decreased by $3.3 million during the third quarter of 2016. The decrease in cash was primarily related to $2.7 million to fund our share of the Donlin Gold and Galore Creek projects and $0.5 million used in operating activities for administrative costs and working capital.

Cash used in operations decreased from $1.8 million in 2015, to $0.5 million in 2016, primarily due to the receipt of exploration tax credits resulting from drilling programs at Galore Creek in prior years.

#### First nine months 2016 compared to 2015

Cash and cash equivalents decreased by $13.3 million and term deposits decreased by $5.0 million during the first nine months of 2016. The decrease in cash was primarily related to $10.4 million used in operating activities for administrative costs and withholding taxes paid on performance share units vested and $7.9 million to fund our share of the Donlin Gold and Galore Creek projects, partially offset by a $5.0 million reduction in term deposits.

- Cash used in operations increased from $9.9 million in 2015, to $10.4 million in 2016, primarily due to higher withholding taxes paid on performance share units vested in the first quarter of 2016, partially offset by the receipt of exploration tax credits.
- Cash used to fund Donlin Gold and Galore Creek decreased by $1.3 million in 2016 due to the timing of Donlin Gold funding requirements for permitting.
- Cash provided from term deposits was $5.0 million in 2016 and $10.0 million in 2015.
- Cash used in financing activities in 2015 included $15.8 million to repay the remaining convertible notes.

### Outstanding share data

As of September 27, 2016, the Company had 320,015,809 common shares issued and outstanding. Also as of September 27, the Company had outstanding 19,828,841 stock options with a weighted-average exercise price of C$4.50, 2,619,150 Performance Share Units and 286,847 Deferred Share Units. Upon exercise of the foregoing convertible securities, the Company would be required to issue a maximum of 24,044,413 common shares.

### Accounting Developments

For a discussion of Recently Adopted and Recently Issued Accounting Pronouncements, see Note 2 to the Condensed Consolidated Interim Financial Statements.

## Market risk

As filed, 1,761 characters.

Our financial instruments are exposed to certain financial risks, including currency, credit and interest rate risks.

#### Currency risk

We are exposed to financial risk related to the fluctuation of foreign exchange rates. We operate in Canada and the United States and a portion of our expenses are incurred in Canadian dollars. A significant change in the currency exchange rate between the Canadian dollar relative to the U.S. dollar could have an effect on our results of operations, financial position or cash flows.

We have not hedged our exposure to currency fluctuations. At August 31, 2016, we are exposed to currency risk through our investment in the Galore Creek project, mineral properties, deferred income taxes and cash balances held in Canadian dollars.

Based on the above net exposures as at August 31, 2016, and assuming that all other variables remain constant, a $0.01 depreciation or appreciation of the Canadian dollar against the U.S. dollar would result in an increase/decrease of approximately $3.0 million in our consolidated comprehensive income (loss).

#### Credit risk

Concentration of credit risk exists with respect to our cash and cash equivalents and term deposit investments. All deposits are held through two large Canadian chartered banks with high investment-grade ratings and have maturities of less than one year.

#### Interest rate risk

The interest rate on the promissory note owed to Barrick Gold Corporation is variable with the U.S. prime rate. Based on the amount owing on the promissory note as at August 31, 2016, and assuming that all other variables remain constant, a 1% change in the U.S. prime rate would result in an increase/decrease of approximately $0.8 million in the interest accrued by us per annum.

## Controls and procedures

As filed, 1,582 characters.

Management, with the participation of our President and Chief Executive Officer and Chief Financial Officer, evaluated the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Exchange Act) as of August 31, 2016. On the basis of this review, our President and Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures are effective to ensure that the information we are required to disclose in reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the rules and forms of the SEC and to ensure that information required to be disclosed in the reports filed or submitted under the Exchange Act is accumulated and communicated to our management, including our President and Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

There have not been any changes in the Company’s internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) promulgated by the SEC under the Exchange Act) during the Company’s most recently completed fiscal quarter that have materially affected, or are reasonably likely to materially affect the Company’s internal control over financial reporting. The company’s internal controls over financial reporting are based on criteria established in Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission.

## Risk factors

As filed, 619 characters.

There have been no material changes to the risk factors set forth in our Annual Report on Form 10-K for the year ended November 30, 2015, as filed with the SEC on January 27, 2016. The risk factors in our Annual Report on Form 10-K for the year ended November 30, 2015, in addition to the other information set forth in this quarterly report, could materially affect our business, financial condition or results of operations. Additional risks and uncertainties not currently known to us or that we deem to be immaterial could also materially adversely affect our business, financial condition or results of operations.

Filed Oct 4, 2016.
Source: SEC EDGAR, the filing index for accession 0001102624-16-003447. Last ingested by Listed: Nov 11, 2026, 03:11 ET. No prices; not investment advice.