# Southern Copper Corp/: Form 10-K for the period ended Dec 31, 2008

- Company: [Southern Copper Corp/](/companies/scco.md) (CIK 1001838)
- Form: 10-K
- Filed: 2009-03-02
- Accepted by EDGAR: Mar 2, 2009, 06:08 ET
- Period: 2008-12-31
- Accession: 0001104659-09-013233
- Inline XBRL: no
- Main document: https://www.sec.gov/Archives/edgar/data/1001838/000110465909013233/a09-1444_110k.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1001838/000110465909013233/

## Business

As filed, 44,469 characters.

THE COMPANY

Southern Copper Corporation is one of the largest integrated copper producers in the world. We produce copper, molybdenum, zinc and silver. All of our mining, smelting and refining facilities are located in Peru and in Mexico and we conduct exploration activities in those countries and Chile. See Item 2 Properties, “Review of Operations” for maps of our principal mines, smelting facilities and refineries. Our operations make us one of the largest mining companies in Peru and also in Mexico. We are one the largest copper mining companies in the world with significant copper reserves. We were incorporated in Delaware in 1952 and have conducted copper mining operations since 1960. Since 1996, our common stock has been listed on both the New York and Lima Stock Exchanges.

Our Peruvian copper operations involve mining, milling and flotation of copper ore to produce copper concentrates and molybdenum concentrates; the smelting of copper concentrates to produce anode copper; and the refining of anode copper to produce copper cathodes. As part of this production process, we also produce significant amounts of molybdenum concentrate and refined silver. We also produce refined copper using SX/EW technology. We operate the Toquepala and Cuajone mines high in the Andes Mountains, approximately 860 kilometers southeast of the city of Lima, Peru. We also operate a smelter and refinery west of the Toquepala and Cuajone mines in the coastal city of Ilo, Peru.

Our Mexican operations are conducted through our subsidiary, Minera Mexico S.A. de C.V. (“Minera Mexico”), which we acquired on April 1, 2005. Minera Mexico engages principally in the mining and processing of copper, molybdenum, zinc, silver, gold and lead. Minera Mexico operates through subsidiaries that are grouped into three separate units. Mexicana de Cobre S.A. de C.V. (together with its subsidiaries, the “Mexcobre Unit”) operates La Caridad, an open-pit copper mine, a copper ore concentrator, a SX/EW plant, a smelter, refinery and a rod plant. Mexicana de Cananea S.A. de C.V. (together with its subsidiaries, the “Cananea Unit”) operates Cananea, an open-pit copper mine, which is located at the site of one of the world’s largest copper ore deposits, a copper concentrator and two SX/EW plants. Industrial Minera Mexico, S.A. de C.V. and Minerales Metalicos del Norte, S.A. (together with its subsidiaries, the “IMMSA Unit”) operate five underground mines that produce zinc, lead, copper, silver and gold, a coal mine and several industrial processing facilities for zinc and copper.

We utilize many up-to-date mining and processing methods, including global positioning systems and computerized mining operations. Our operations have a high level of vertical integration that allows us to manage the entire production process, from the mining of the ore to the production of refined copper and other products and most related transport and logistics functions, using our own facilities, employees and equipment.

The sales prices for our products are largely determined by market forces outside of our control. Our management, therefore, focuses on cost control and production enhancement to remain profitable. We endeavor to achieve these goals through capital spending programs, exploration efforts and cost reduction programs. Our focus is on seeking to remain profitable during periods of low copper prices and maximizing results in periods of high copper prices. For additional information on the sale prices of the metals we produce, please see “Metal prices.”

Currency Information:

Unless stated otherwise, all our financial information is presented in US dollars and any reference herein to “U.S. dollars”, “dollars”, or “$” are to U.S. dollars; references to “S/.”, “nuevo sol” or “nuevos soles”, are to Peruvian nuevos soles; and references to “peso”, “pesos”, or “Ps.”, are to Mexican pesos.

Unit Information:

Unless otherwise noted, all tonnages are in metric tons. To convert to short tons, multiply by 1.102. All ounces are troy ounces. All distances are in kilometers. To convert to miles, multiply by 0.621. To convert hectares to acres, multiply by 2.47.

ORGANIZATIONAL STRUCTURE

The following chart describes our organizational structure starting with our controlling stockholder as of December 31, 2008. For clarity of presentation, the chart identifies only principal subsidiaries and eliminates intermediate holding companies.

We are a majority-owned, indirect subsidiary of Grupo Mexico S.A.B. de C.V. (“Grupo Mexico”). Through its wholly-owned subsidiaries, Grupo Mexico as of December 31, 2008 owns approximately 79.0% of our capital stock. Grupo Mexico’s principal business is to act as a holding company for shares of other corporations engaged in the mining, processing, purchase and sale of minerals and other products and railway and other related services.

We conduct our operations in Peru through a registered branch (the “SPCC Peru Branch” or “Peruvian Branch”). The SPCC Peru Branch comprises substantially all of our assets and liabilities associated with our copper operations in Peru. The SPCC Peru Branch is not a corporation separate from us and, therefore, obligations of SPCC Peru Branch are direct obligations of SCC and vice-versa. It is, however, an establishment, registered pursuant to Peruvian law, through which we hold assets, incur liabilities and conduct operations in Peru. Although it has neither its own capital nor liability separate from us, it is deemed to have equity capital for purposes of determining the economic interests of holders of our investment shares, formerly known as labor shares (See Note 13 “Minority interest” of our consolidated financial statements).

On April 1, 2005, we acquired Minera Mexico, the largest mining company in Mexico on a stand-alone basis, from Americas Mining Corporation (“AMC”), a subsidiary of Grupo Mexico, our controlling stockholder. Minera Mexico is a holding company and all of its operations are conducted through subsidiaries that are grouped into three units: (i)the Mexcobre unit (ii) the Cananea unit and (iii) the IMMSA unit. We own 99.95% of Minera Mexico.

In 2008, in accordance with our approved $500 million share repurchase plan, we repurchased 28.5 million of our common shares. In addition, in 2008 AMC purchased approximately 11.8 million shares of our common shares. As a result of these transactions Grupo Mexico’s ownership of our capital stock increased to 79.0%. In 2009, through February 23, we purchased an additional 2.7 million shares of our common shares and AMC purchased 2.2 million shares of our common shares. As a result, as of February 23, 2009 Grupo Mexico’s ownership of our capital stock increased to 79.5%. Please see Note 22 “Subsequent Events”.

REPUBLIC OF PERU AND MEXICO

Our revenues are derived principally from our operations in Peru and Mexico. Risks attendant to the Company’s operations in both countries include our operations in those countries associated with economic and political conditions, effects of currency fluctuations and inflation, effects of government regulations and the geographic concentration of the Company’s operations.

AVAILABLE INFORMATION

We file annual, quarterly and current reports, proxy statements and other information with the U.S. Securities and Exchange Commission (“SEC”). You may read and copy any document we file at the SEC’s Public Reference Room at 100 F Street, Washington, D.C. 20549. Please call the SEC at 1-800-SEC-0330 for information on the Public Reference Room. The SEC maintains a web-site that contains annual, quarterly and current reports, proxy statements and other information that issuers (including Southern Copper Corporation) file electronically with the SEC. The SEC’s web-site is www.sec.gov.

Our Internet address is www.southerncoppercorp.com. Commencing with the Form 8-K dated March 14, 2003, we have made available free of charge on this internet address our annual, quarterly and current reports, as soon as reasonably practical after we electronically file such material with, or furnish it to, the SEC. Our web page includes the Corporate Governance guidelines and the charters of our most significant Board Committees. However, the information found on our website is not part of this or any other report.

CAUTIONARY STATEMENT

Forward-looking statements in this report and in other Company statements include statements regarding expected commencement dates of mining or metal production operations, projected quantities of future metal production, anticipated production rates, operating efficiencies, costs and expenditures, including taxes, as well as projected demand or supply for the Company’s products. Actual results could differ materially depending upon factors including the risks and uncertainties relating to general U.S. and international economic and political conditions, the cyclical and volatile prices of copper, other commodities and supplies, including fuel and electricity, availability of materials, insurance coverage, equipment, required permits or approvals and financing, the occurrence of unusual weather or operating conditions, lower than expected ore grades, water and geological problems, the failure of equipment or processes to operate in accordance with specifications, failure to obtain financial assurance to meet closure and remediation obligations, labor relations, litigation and environmental risks, as well as political and economic risk associated with foreign operations. Results of operations are directly affected by metals prices on commodity exchanges, which can be volatile.

Additional business information follows:

COPPER BUSINESS

Copper is the world’s third most widely used metal and an important component in the world’s infrastructure. Copper has unique chemical and physical properties, including high electrical conductivity and resistance to corrosion, as well as excellent malleability and ductility that has made it a superior material for use in the electrical energy, telecommunications, building construction, transportation and industrial machinery businesses. Copper is also an important metal in non-electrical applications such as plumbing and roofing and, when alloyed with zinc to form brass, in many industrial and consumer applications.

Copper industry fundamentals, including copper demand, price levels and stocks, strengthened in late 2003 and copper prices continued to improve into the third quarter of 2008, from the 15-year price lows set during 2002. However, late in the third quarter of 2008 the price of copper along with many of the world’s principal commodities weakened and began a decline that continues to date.

BUSINESS REPORTING SEGMENTS:

Company management views Southern Copper as having three operating segments and manages on the basis of these segments.

The three segments identified are groups of individual mines with similar economic characteristics, type of products, processes and support facilities, similar regulatory environments, similar employee bargaining contracts and similar currency risks. In addition, each mine within the individual group earns revenues from similar type of customers for their products and services and each group incurs expenses independently, including commercial transactions between groups.

Intersegment sales are based on arm’s-length prices at the time of sale. These may not be reflective of actual prices realized by the Company due to various factors, including additional processing, timing of sales to outside customers and transportation cost. Added to the segment information is information regarding the Company’s sales. The segments identified by the Company are:

1\. Peruvian operations include the Toquepala and Cuajone mine complexes and the smelting and refining plants, industrial railroad and port facilities which service both mines. Sales of its products are recorded as revenue of our Peruvian mines. The Peruvian operations produce copper, with production of by-product molybdenum, silver and other material.

2\. Mexican open pit operations, which include La Caridad and Cananea mine complexes and the smelting and refining plants and support facilities which service both mines. Sales of its products are recorded as revenue of our Mexican mines. The Mexican open pit operations produce copper, with production of by-products of molybdenum, silver and other material.

3\. Mexican underground mining operations include five underground mines that produce zinc, copper, silver and gold, a coal mine which produces coal and coke, and several industrial processing facilities for zinc, copper and silver. This group is identified as the IMMSA unit and sales of its products are recorded as revenue of the IMMSA unit.

Financial information is regularly prepared for each of the three segments and the results are reported to the Chief Operating Officer on the segment basis. The Chief Operating Officer focuses on operating income and on total assets as measures of performance to evaluate different segments and to make decisions to allocate resources to the reported segments. These are common measures in the mining industry.

Segment information is included in Item 2 under the captions “Metal Production by Segments” and “Ore Reserves.” More information on business segment and segment financial information are included in Note 20 of our consolidated financial statements.

CAPITAL EXPANSION PROGRAM

For a description of our Capital Expansion Program see “Management’s Discussion and Analysis of Financial Condition and Results of Operations-Capital Expansion Program.”

EXPLORATION ACTIVITIES

We are engaged in ongoing extensive exploration to locate additional ore bodies in Peru, Mexico and Chile. We also conduct exploration in the areas of our current mining operations. We invested $37.0 million on exploration programs in 2008, $40.2 million in 2007 and $22.7 million in 2006. In view of the uncertain economic conditions and the low metal prices we have reduced our budgeted 2009 exploration expenditures to $22.7 million.

Currently in Peru, we have direct control of 194,190 hectares of mineral rights. In Mexico, we hold 347,734 hectares of exploration concessions. We also hold 35,958 hectares of exploration concessions in Chile.

#### Peru

*Los Chancas.* The Los Chancas project, located in the department of Apurimac in southern Peru, is a copper and molybdenum porphyry deposit.

As a result of the pre-feasibility studies and after the preliminary design of the pit, estimates show 355 million tons of mineralized material with a copper content of 0.62%, 0.05% of molybdenum and 0.039 grams of gold per ton. In the last quarter of 2008 additional studies were started as well as a diamond drilling program for additional 35,000 meters, in order to define the extent of the deposit. Also a bidding process is under way for a feasibility study to be developed in 2009.

*Tantahuatay.* The Tantahuatay project is located in the department of Cajamarca in northern Peru. The exploration work conducted in 2008 was intended to evaluate the upper part of the deposit mainly for gold recovery. Work to date indicates 27.1 million tons of mineralized material, with an average silver content of 13.0 grams per ton and 0.89 grams of gold per ton. In 2008 we continued with the feasibility study and with our efforts to resolve the social and environmental concerns of communities near the project. We have a 44.25% share in this project.

#### Other Peruvian Prospects

In 2008 we conducted a total of 32,551.90 meters of diamond drilling in the area surrounding the Tia Maria Project as well as regional exploration conducted mainly in the Ayacucho Region. For 2009 the exploration program will be focused in central and southern Peru with defined projects in the Tacna and Ayacucho regions and we will continue with prospecting programs in the different mineralized strips.

#### Mexico

In addition to exploratory drilling programs at existing mines, we are currently conducting exploration to locate mineral deposits at various other sites in Mexico. The following are some of the more significant exploration projects:

*El Arco.* The El Arco site is located in the state of Baja California in Mexico. Preliminary investigations of the El Arco site indicate a deposit of 846 million tons of mineralized material with average copper grades of 0.51% and 0.14 grams of gold per ton, and 170 million tons of leach mineralized materials with average copper grades of 0.56%. In 2008, we have continued the process of identifying water sources for a leaching operation. Production wells will be tested to determine the water potential of this area. Also, five diamond drill holes have been drilled to a depth of 600 meters. The drilling indicates mineralized material, with 0.50%-0.70% copper mineralization extending 270 meters below the previously known mineralization.

*Angangueo.* The Angangueo site is located in the state of Michoacán in Mexico. A deposit of 13 million tons of mineralized material has been identified with diamond drilling. Testing indicates that the deposit contains mineralized material containing 0.16 grams of gold and 262 grams of silver per ton, and is comprised of 0.79% lead, 0.97% copper and 3.5% zinc. During 2005, we received the approval for our environmental impact study and we are in the process of obtaining land use approval. During 2008, we have continued negotiating with the state of Michoacan to purchase various properties essential to the operation. In addition, a feasibility study was commissioned; the results are expected to be available by the end of first quarter 2009.

*Buenavista.* The Buenavista project site is located in the state of Sonora in Mexico, adjacent to the Cananea ore body. Drilling and metallurgical studies have shown that the site contains 36 million tons of mineralized material containing 29 grams of silver, 0.69% of copper and 3.3% of zinc per ton. A new “scoping level” study indicates that Buenavista may be an economical deposit. During 2007, 2,100 meters were drilled to upgrade the mineralized material and to acquire material for metallurgical testing. Results confirm the previous geologic interpretation of the mineralized areas. Due to the Cananea strike no work was performed in 2008.

*Carbon Coahuila.* In Coahuila, an intensive exploration program of diamond drilling has identified two additional areas, Esperanza with a potential for more than 30 million tons of “in place” mineralized coal and Guayacan with a potential for 15 million tons of “in place” mineralized coal, that could be used for a future coal-fired power plant. During 2007 along with 5,767 meters of drilling, 23 million tons of mineralized coal resources were identified at our Nueva Rosita No. 16 concession. Due to changed priorities, no work was done on this project in 2008.

*The Chalchihuites.* The Chalchihuites project is located in the state of Zacatecas. It is a contact deposit with mixed oxides and sulfides of lead, copper, zinc and silver. A drilling program, in the late nineties, defined 16 million tons of mineralized material containing 95 grams of silver, 0.36% lead, 0.69% copper and 3.08% zinc per ton. Preliminary metallurgical testing indicates a leaching precipitating-flotation recovery process that can be applied to this ore. Due to other priorities only the diamond drilling for metallurgical testing was performed in 2008.

*Sierra de Lobos.* This project is located southwest of the city of Leon, Guanajuato. Our target is a copper and zinc deposit with grades between 0.5% and 1.0% copper and between 5% and 7% zinc including a small contribution of gold and silver. In 2008, 1,636 meters were drilled. Results confirm the presence of copper and zinc mineralization, but an economic deposit has not yet been identified.

*Pilares.* During 2008, we bought Freeport-McMoran’s 49% interest in Minera Pilares,S.A. de C.V. (“Minera Pilares”), giving us 100% ownership. Minera Pilares is located in the state of Sonora, ten kilometers from the town of Nacozari de Garcia. The work to clear and prepare the access to the Porvenir tunnel started at the end of 2008. Calculations using Mine-Sight software indicated 52.9 million tons of mineralized material, with 0.92% copper content.

#### Chile

*El Salado.* The El Salado prospect, located in the Atacama Region, corresponds to a copper-gold ore body which includes the Diego de Almeida sector. During 2008 a total of 3,232 meters of diamond drilling was performed which is expected to continue in 2009.

*Other Chilean Prospects.* During 2008 we continued with the exploration of Resguardo, (gold and copper veins) located in northern Chile (Region III-Atacama), with 3,729 meters of diamond drilling. We also performed 1,000 meters of diamond drilling at the Ticnamar prospect located in northern Chile (Region I-Tarapaca). Ticnamar is a porphiric deposit of copper and molybdenum. The exploration program for 2009 mainly contemplates continuing with the diamond drilling at El Salado, Resguardo and Ticnamar and to obtain the necessary permits to continue with the exploration of the gold-silver Catanave prospect.

PRINCIPAL PRODUCTS AND MARKETS

The principal uses of copper are in the building and construction industry, electrical and electronic products and, to a lesser extent, industrial machinery and equipment, consumer products and the automotive and transportation industries. Molybdenum is used to toughen alloy steels and soften tungsten alloy and is also used in fertilizers, dyes, enamels and reagents. Silver is used for photographic, electrical and electronic products and, to a lesser extent, brazing alloys and solder, jewelry, coinage, silverware and catalysts. Zinc is primarily used as a coating on iron and steel to protect against corrosion. It is also used to make die cast parts, in the manufacturing of batteries and in the form of sheets for architectural purposes.

Our marketing strategy and annual sales planning emphasize developing and maintaining long-term customer relationships, and thus acquiring annual or other long-term contracts for the sale of our products is a high priority. Approximately 90% of our metal production for the year 2008, 2007 and 2006, was sold under annual or longer-term contracts. Sales prices are determined based on prevailing commodity prices for the quotation period according to the terms of the contract.

We focus on the ultimate end-user customers as opposed to selling on the spot market or to trading companies. In addition, we devote significant marketing effort to diversifying our sales both by region and by customer base. We strive to provide superior customer service, including just-in-time deliveries of our products. Our ability to consistently fulfill customer demand is supported by our substantial production capacity.

For additional information on sales please see Revenue recognition on Note 2 “Summary of significant accounting policies” and Note 20 “Segments” of our consolidated financial statements.

METALS PRICES

Prices for our products are principally a function of supply and demand and, except for molybdenum, are established on the Commodities Exchange, or COMEX, in New York and the London Metal Exchange or LME, the two most important metal exchanges in the world. Prices for our molybdenum products are established by reference to the publication Platt’s Metals Week. Our contract prices also reflect any negotiated premiums and the costs of freight and other factors. From time to time, we have entered into hedging transactions to provide partial protection against future decreases in the market price of metals and we may do so under certain market conditions. We have entered into copper swaps and collar contracts in 2008, 2007 and 2006, and into zinc swap contracts in 2006. At December 31, 2008 we did not have any copper or zinc swap contracts outstanding. For a further discussion of derivative instruments see “Item 7 Quantitative and Qualitative Discussion about Market Risk”. For a further discussion of prices for our products, please see “Management’s Discussion and Analysis of Financial Condition and Results of Operations —Metal Prices.”

The table below shows the high, low and average COMEX and LME copper prices during the last 15 years:

| Year | Copper (COMEX) High | Low | Average | Copper (LME) High | Low | Average |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| 1994 | 1.40 | 0.78 | 1.07 | 1.40 | 0.78 | 1.05 |
| 1995 | 1.44 | 1.30 | 1.37 | 1.47 | 1.23 | 1.33 |
| 1996 | 1.31 | 0.86 | 1.06 | 1.29 | 0.83 | 1.04 |
| 1997 | 1.23 | 0.76 | 1.04 | 1.23 | 0.77 | 1.03 |
| 1998 | 0.86 | 0.64 | 0.75 | 0.85 | 0.65 | 0.75 |
| 1999 | 0.85 | 0.61 | 0.72 | 0.84 | 0.61 | 0.71 |
| 2000 | 0.93 | 0.74 | 0.84 | 0.91 | 0.73 | 0.82 |
| 2001 | 0.87 | 0.60 | 0.73 | 0.83 | 0.60 | 0.72 |
| 2002 | 0.78 | 0.65 | 0.72 | 0.77 | 0.64 | 0.71 |
| 2003 | 1.04 | 0.71 | 0.81 | 1.05 | 0.70 | 0.81 |
| 2004 | 1.54 | 1.06 | 1.29 | 1.49 | 1.06 | 1.30 |
| 2005 | 2.28 | 1.40 | 1.68 | 2.11 | 1.39 | 1.67 |
| 2006 | 4.08 | 2.13 | 3.10 | 3.99 | 2.06 | 3.05 |
| 2007 | 3.75 | 2.40 | 3.23 | 3.77 | 2.37 | 3.23 |
| 2008-1st Q | 3.99 | 3.05 | 3.53 | 4.03 | 3.02 | 3.54 |
| 2008-2nd Q | 4.03 | 3.53 | 3.80 | 4.03 | 3.59 | 3.83 |
| 2008-3rd Q | 4.08 | 2.89 | 3.45 | 4.08 | 2.91 | 3.48 |
| 2008-4th Q | 2.80 | 1.25 | 1.75 | 2.89 | 1.26 | 1.77 |
| 2008 | 4.08 | 1.25 | 3.13 | 4.08 | 1.26 | 3.16 |

11

The per pound COMEX copper price during the last 5, 10 and 15 year periods averaged $2.49, $1.63 and $1.44, respectively. The per pound LME copper price during the last 5, 10 and 15 year periods averaged $2.48, $1.62 and $1.42, respectively.

At February 23, 2009, the COMEX and LME copper prices were $1.45 and $1.43 per pound, respectively.

The table below shows the high, low and average market prices for our three principal by-products during the last 15 years:

| Year | Zinc (LME) High | Low | Average | Silver (COMEX) High | Low | Average | Molybdenum (Dealer Oxide Platt’s Metals Week) High | Low | Average |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| 1994 | 0.52 | 0.42 | 0.45 | 5.78 | 4.57 | 5.28 | 15.50 | 2.76 | 4.51 |
| 1995 | 0.52 | 0.44 | 0.47 | 6.10 | 4.38 | 5.19 | 16.50 | 4.25 | 8.08 |
| 1996 | 0.48 | 0.45 | 0.47 | 5.82 | 4.67 | 5.18 | 5.25 | 3.13 | 3.79 |
| 1997 | 0.80 | 0.47 | 0.60 | 6.31 | 4.16 | 4.87 | 4.75 | 3.59 | 4.31 |
| 1998 | 0.52 | 0.42 | 0.46 | 7.26 | 4.61 | 5.53 | 4.48 | 2.10 | 3.42 |
| 1999 | 0.56 | 0.41 | 0.49 | 5.76 | 4.87 | 5.22 | 2.80 | 2.52 | 2.66 |
| 2000 | 0.58 | 0.46 | 0.51 | 5.55 | 4.56 | 4.97 | 2.92 | 2.19 | 2.56 |
| 2001 | 0.48 | 0.33 | 0.40 | 4.81 | 4.03 | 4.36 | 2.58 | 2.19 | 2.35 |
| 2002 | 0.38 | 0.33 | 0.35 | 5.11 | 4.22 | 4.60 | 7.90 | 2.43 | 3.76 |
| 2003 | 0.46 | 0.34 | 0.38 | 5.98 | 4.35 | 4.89 | 7.60 | 3.28 | 5.29 |
| 2004 | 0.58 | 0.43 | 0.48 | 8.21 | 5.51 | 6.68 | 32.38 | 7.35 | 16.20 |
| 2005 | 0.87 | 0.53 | 0.63 | 9.00 | 6.43 | 7.32 | 39.25 | 25.00 | 31.99 |
| 2006 | 2.10 | 0.87 | 1.49 | 14.85 | 8.82 | 11.54 | 28.20 | 21.00 | 24.75 |
| 2007 | 1.93 | 1.00 | 1.47 | 15.50 | 11.47 | 13.39 | 33.75 | 24.50 | 30.19 |
| 2008-1st Q | 1.28 | 0.99 | 1.10 | 20.69 | 15.17 | 17.62 | 33.55 | 32.38 | 33.22 |
| 2008-2nd Q | 1.07 | 0.82 | 0.96 | 18.31 | 16.12 | 17.17 | 33.35 | 32.35 | 32.90 |
| 2008-3rd Q | 0.92 | 0.74 | 0.80 | 19.18 | 10.46 | 14.92 | 33.88 | 32.25 | 33.53 |
| 2008-4th Q | 0.75 | 0.47 | 0.54 | 12.72 | 8.79 | 10.15 | 31.40 | 8.75 | 16.63 |
| 2008 | 1.28 | 0.47 | 0.85 | 20.69 | 8.80 | 14.97 | 33.88 | 8.75 | 28.42 |

The per pound LME zinc price during the last 5, 10 and 15 year periods averaged $0.98, $0.71 and $0.63, respectively. The per ounce COMEX silver price during the last 5, 10 and 15 year periods averaged $10.78, $7.79 and $6.93, respectively. The per pound Platt’s Metals Week Dealer Oxide molybdenum price during the last 5, 10 and 15 year periods averaged $26.31, $14.82 and $11.49, respectively.

At February 23, 2009 the LME zinc price was $0.49 per pound, the COMEX silver price was $14.36 per ounce and the Platt’s Metals Week Dealer Oxide molybdenum price was $8.70 per pound.

COMPETITIVE CONDITIONS

Competition in the copper market is principally on a price and service basis, with price being the most important consideration when supplies of copper are ample. The Company’s products compete with other materials, including aluminum and plastics.

EMPLOYEES

As of December 31, 2008, we had 11,494 employees, approximately 73.0% of whom are covered by labor agreements with ten different labor unions. During the last several years, we have experienced strikes or other labor disruptions that have had an adverse impact on our operations and operating results. Since July 2007 and during all of 2008 our Cananea mine, Taxco mine and San Martin mine in Mexico have been on strike. We cannot assure you when these strikes will be settled, or that in the future we will not experience strikes or other labor related work stoppages that could have a material adverse effect on our financial condition and results of operations.

Peru

Approximately 68% of our Peruvian labor force was unionized at December 31, 2008, represented by eight separate unions. Three of these unions, one at each of our major production areas, represent the majority of our workers. The collective bargaining agreements for these unions last through February 2010. Additionally, there are five smaller unions, representing the balance of our workers. Collective bargaining agreements for this group are in force through November 2012.

From June 30 to July 5, 2008 the three major unions went on strike in support of a mining federation strike. During this strike operations were near normal; an insignificant amount of production was lost as we worked with the support of the staff and administrative personnel and with contractors.

Employees of the Toquepala and Cuajone units reside in townsites, where we have built 2,513 houses and apartments and 1,186 houses and apartments, respectively. In 1998, Company housing, at our Ilo unit, was sold to workers at nominal prices. We still hold 90 houses at Ilo for staff personnel. Housing, together with maintenance and utility services, is provided at minimal cost to most of our employees. Our townsite and housing complexes include schools, medical facilities, churches, social clubs, shopping, banking and other services.

Mexico

Approximately 75% of our Mexican labor force was unionized at December 31, 2008, represented by two separate unions. Under Mexican law, the terms of employment for unionized workers is set forth in collective bargaining agreements. Mexican companies negotiate the salary provisions of collective bargaining agreements with the labor unions annually and negotiate other benefits every two years. We conduct negotiations separately at each mining complex and each processing plant.

In the last seven years the Cananea mine has experienced more than nine labor stoppages totaling more than 634 days of inactivity through December 31, 2008. Since July 30, 2007 and during 2008, our Cananea mine in Mexico started a work stoppage, which continues into 2009. On January 11, 2008 the Mexican Federal Labor Court declared the Cananea strike illegal and ordered the workers to return to work within 24 hours. The workers partially returned to work and the Company resumed operations. However, on April 11, 2008 the workers restarted the labor stoppage and shut down production, based upon a new federal ruling. On September 4, 2008, the Fourth Labor District Judge granted the Company’s motion for reconsideration of a ruling by the federal labor court. In December 2008, the Mexican Federal Labor Court ruled in favor of the Company and declared the strike illegal. The union appealed this decision. On January 7, 2009 the judge of the fifth district on labor matters annulled the favorable decision to the Company. The Company has filed a request for a review of this ruling before an appellate federal court. The Company will continue to pursue a favorable resolution of the labor stoppage.

The Company has tried unsuccessfully to resolve the current labor stoppage that obstructs production at Cananea; hence in the second quarter 2008, the Board of Directors offered all Cananea employees a severance payment in accordance with the collective bargaining agreement and applicable law. This was offered in order to award the employees a significant severance payment that allows them to choose the labor alternative that is best for each of them. During 2008, under this plan, a group of employees was terminated at a cost to the Company of $15.2 million, which was recorded in cost of sales on the consolidated statement of earnings. We have estimated a liability of $36.4 million, which has been recorded on the consolidated balance sheet.

The Company has the right to resume operations at the mine with those workers who wish to continue. Nevertheless some strikers have illegally blocked the entrance to the unit. The Company has filed two successive complaints before an upper court in order to require the Fifth District judge to safeguard the Company’s right to operate.

Additionally, our Taxco and San Martin mines have been on strike since July 2007. It is expected that operations at these mines will remain suspended until these labor issues are resolved.

In 2006, there were a number of work stoppages at some of our Mexican operations. While some of these work stoppages were of a short-term nature with little or no production loss, others have been more disruptive. A strike at the La Caridad copper mine in Sonora began in the first quarter of 2006 and ended when the mine was returned to us on July 26, 2006. A strike at the San Martin polymetallic complex in Zacatecas commenced in the first quarter of 2006 and ended in May 2006. Additionally, workers at the Cananea copper mine went on strike on June 1, 2006 returning to work six weeks later on July 17, 2006. These work stoppages were declared illegal by the Mexican authorities. On June 9, 2006, we announced the closing of the La Caridad mine as picketing workers made it impossible to continue operations. As a result of these strikes, we declared “force majeure” on certain of our June and July copper contracts. On July 14, 2006, with the approval of a labor court, we dismissed the La Caridad workers. Individual work agreements, and the collective union contract, were terminated in compliance with the provisions of the ruling rendered by federal labor authorities. On July 26, 2006, the La Caridad installations were returned to us and we commenced to hire workers to resume operations.

Employees of the Mexcobre and Cananea Units reside in townsites at La Caridad and Cananea, where we have built approximately 2,000 houses and apartments and 275 houses and apartments, respectively. Employees of the IMMSA Unit principally reside on the grounds of the mining or processing complexes in which they work and where we have built approximately 900 houses and apartments. Housing, together with maintenance and utility services, is provided at minimal cost to most of our employees. Our townsites and housing complexes include educational and, in some units, medical facilities, churches, social clubs, shopping, banking and other services. At the Cananea Unit, health care is provided free of charge to employees, retired unionized employees and their families.

FUEL, ELECTRICITY AND WATER SUPPLIES

The principal raw materials used in our operations are fuels (including fuel oil to power boilers and generators, natural gas for metallurgical processes at our Mexican operations and diesel fuel for mining equipment), electricity and water. We believe that supplies of fuel, electricity and water are readily available. Although the prices of these raw materials may fluctuate beyond our control, we focus our efforts to reduce these increased costs through cost and energy saving measures.

Peru

In Peru, electric power for our operating facilities is generated by two thermal electric plants owned and operated by Energia del Sur, S.A. (“Enersur”), a diesel and waste heat boilers plant located adjacent to the Ilo smelter and a coal plant located south of Ilo. Power generation capacity for Peruvian operations is currently 344 megawatts. In addition, we have nine megawatts of power generation capacity from two small hydro-generating installations at Cuajone. Power is distributed over a 224-kilometer closed loop transmission circuit. We obtain fuel in Peru principally from a local producer.

In 1997, we sold our Ilo power plant to Enersur and entered into a twenty year power purchase agreement. We and Enersur also entered into an agreement for the sharing of certain services between the power plant and our smelter at Ilo. These arrangements were amended in 2003, releasing Enersur from its obligations to construct additional capacity to meet our increased electricity requirements. We believe we can satisfy the need for increased electricity requirements for our Peru operations from other sources, including local power providers.

In Peru, we have water rights or licenses for up to 1,950 liters per second from well fields at Huaitire, Vizcachas and Titijones aquifers and also surface water from the Suches lake and two small water courses, namely Quebrada Honda and Quebrada Tacalaya, which together are sufficient to supply the needs of our two operating units at Toquepala and Cuajone. At Ilo, we have desalinization plants that produce water for industrial and domestic use that we believe are sufficient for our current and projected needs.

Mexico

In Mexico, fuel is purchased directly or indirectly from Petroleos Mexicanos, (“PEMEX”), the state oil monopoly. Electricity for our Mexican operations, which is used as the main energy source at our mining complexes, is either purchased from the *Comision Federal de Electricidad* (the Federal Electricity Commission, or CFE), the state’s electrical power producer, or steam-generated at Mexcobre’s smelter by recovering energy from waste heat boilers. Accordingly, a significant portion of our operating costs in Mexico are dependent upon the pricing policies of PEMEX and CFE, which reflect government policy as well as international market prices for crude oil, natural gas and conditions in the refinery markets. Mexcobre imports natural gas from the U.S. through its pipeline (between Douglas, Arizona and Nacozari, Sonora). This permits us to import natural gas from the United States at market prices and thereby reduce operating costs. A contract with PEMEX provides us with the option of using a fixed price for a portion of our natural gas purchases.

In the last three years we entered into gas swap contracts to protect part of our gas consumption in both periods as follows:

|  | 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Gas volume (MMBTUs) | 460,000 | 900,000 | 3,650,000 |
| Fixed price | $8.2175 | $7.5250 | $4.2668 |
| (Loss) gain (in millions) | $(0.9) | $(0.9) | $6.3 |

The losses and gain obtained were included in the production cost. At December 31, 2008, we did not hold any open gas swap contracts.

In December 2005, we announced our plans for a 450 megawatt coal power generation plant in the state of Sonora, Mexico to supply our facilities.

In 2007, we reformulated this project to increase the plant capacity to 600 megawatt. During 2008, we continued with a feasibility study for this plant. In addition, we are reviewing developments in the power plant equipment market, as well as the coal market, in order to reassess the project in light of the current economic crisis.

In Mexico, water is a national property and industries not connected to a public services water supply must obtain a water concession from *Comisión Nacional del Agua* (the “National Water Commission”, or “CNA”). Water usage fees are established in the *Ley Federal de Derechos (the Federal Law on Water Rights),* which distinguishes several availability zones with different fees per unit of volume according to each zone. All of our operations have one or several water concessions and, with the exception of Mexicana de Cobre, pump out the required water from one or several wells. Mexicana de Cobre pumps water from the La Angostura dam, which is close to the mine and plants. At our Cananea facility, we maintain our own wells and pay the CNA for water measured by usage. Water conservation committees have been established in each plant in order to conserve and recycle water. Water usage fees are updated on a yearly basis and have been increasing in recent years.

ENVIRONMENTAL MATTERS

For a discussion of environmental matters reference is made to the information contained under the caption “Environmental matters” in “Note 14 Commitments and Contingencies” of the consolidated financial statements.

MINING RIGHTS AND CONCESSIONS

Peru

We have 249,554 hectares in concessions from the Peruvian government for our exploration, exploitation, extraction and/or production operations, distributed among our various sites as follows:

|  | Toquepala (hectares) | Cuajone | Ilo | Other | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Plants | 300 | 456 | 421 | — | 1,177 |
| Operations | 25,045 | 19,723 | 9,419 | — | 54,187 |
| Exploration | — | — | — | 194,190 | 194,190 |
| Total | 25,345 | 20,179 | 9,840 | 194,190 | 249,554 |

We believe that our Peruvian concessions are in full force and in effect under applicable Peruvian laws and that we are in compliance with all material terms and requirements applicable to these concessions. The concessions have indefinite terms, subject to our payment of concession fees of up to $3.00 per hectare annually for the mining concessions and a fee based on nominal capacity for the processing concessions. Fees paid during 2008, 2007 and 2006 were approximately $1.8 million, $1.4 million and $0.8 million, respectively. We have two types of mining concessions in Peru: metallic and non-metallic concessions. We also have water concessions for well fields at Huaitire, Titijones and Vizcachas and surface water rights from the Suches Lake, which together are sufficient to supply the needs of our Toquepala and Cuajone operating units.

In June 2004, the Peruvian Congress enacted legislation imposing a royalty charge to be paid by mining companies in favor of the regional governments and communities where mining resources are located. Under this law, we are subject to a 1% to 3% charge, based on sales, applicable to the value of the concentrates produced in our Toquepala and Cuajone mines. We made provisions of $53.9 million, $62.8 million and $67.2 million in 2008, 2007 and 2006, respectively, for this charge. These provisions are included in cost of sales (exclusive of depreciation, amortization and depletion) on the consolidated statement of earnings.

Mexico

In Mexico we have approximately 474,079 hectares in concessions from the Mexican government for our exploration and exploitation activities as outlined in the table below.

|  | Underground Mines (hectares) | La Caridad | Cananea | Projects | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Mine concessions | 88,417 | 112,409 | 22,317 | 250,936 | 474,079 |

We believe that our Mexican concessions are in full force and in effect under applicable Mexican laws and that we are in compliance with all material terms and requirements applicable to these concessions. Under Mexican law, mineral resources belong to the Mexican nation and a concession from the Mexican federal government is required to explore or mine mineral reserves. Mining concessions have a 50-year term that can be renewed for another 50 years. Holding fees for mining concessions can be from $0.4 to $8.8 per hectare depending on the expedition dates of mining concession. Fees paid during 2008, 2007 and 2006 were approximately $2.5 million, $2.2 million and $2.1 million, respectively. In addition, all of our operating units in Mexico have water concessions that are in full force and effect. We generally own the land to which our Mexican concessions relate, although ownership is not required in order to explore or mine a concession. We also own all of the processing facilities of our Mexican operations and the land on which they are constructed.

## Risk factors

As filed, 40,992 characters.

Every investor or potential investor in Southern Copper Corporation should carefully consider the following risk factors.

### General Risks Relating to Our Business

***Our financial performance is highly dependent on the price of copper and the other metals we produce.***

Our financial performance is significantly affected by the market prices of the metals that we produce, particularly the market prices of copper, molybdenum, zinc and silver. Historically, prices of the metals we produce have been subject to wide fluctuations and are affected by numerous factors beyond our control, including international economic and political conditions, levels of supply and demand, the availability and costs of substitutes, inventory levels maintained by users, actions of participants in the commodities markets and currency exchange rates. In addition, the market prices of copper and certain other metals have on occasion been subject to rapid short-term changes.

During the last 15-year period the yearly average price of copper per pound on the COMEX ranged from a low $0.72 in 1999 and 2002, to a high $3.23 in 2007. In 2008 the COMEX copper price decreased from a quarterly high of $3.80 per pound in the second quarter to a quarterly low of $ 1.75 per pound in the fourth quarter and closed the year at $1.39 per pound. The LME copper prices during these periods, while slightly different, closely paralleled the COMEX prices. Molybdenum, zinc and silver during the same 15-year period showed average highs and lows as follows: molybdenum $2.35 per pound, low in 2001 and $31.99 per pound, high in 2005; zinc $0.35 per pound, low in 2002 and $1.49 per pound, high in 2006; and silver $4.36 per ounce, low in 2001 and $14.97 per ounce high in 2008. Also please see discussion in Item 1, “Business,” “Metal Prices.”

We cannot predict whether metals prices will rise or fall in the future. Further declines in metals prices and, in particular, copper or molybdenum prices, will have an adverse impact on our results of operations and financial condition, and we might, in very adverse market conditions, consider curtailing or modifying certain of our mining and processing operations.

***Changes in the level of demand for our products could adversely affect our product sales.***

Our revenue is dependent on the level of industrial and consumer demand for the concentrates and refined and semi-refined metal products we sell. Changes in technology, industrial processes and consumer habits may affect the level of that demand to the extent that changes increase or decrease the need for our metal products. A change in demand, including any change resulting from economic slow-downs or recessions, could impact our results of operations and financial condition.

***Our actual reserves may not conform to our current estimates of our ore deposits and we depend on our ability to replenish ore reserves for our long-term viability.***

There is a degree of uncertainty attributable to the calculation of reserves. Until reserves are actually mined and processed, the quantity of ore and grades must be considered as estimates only. The proven and probable ore reserves data included in this report are estimates prepared by us based on evaluation methods generally used in the mining industry. In December 2006, as a result of an intensive drilling program followed by a review by independent mining consultants, we announced an increase in ore reserves at our Peruvian copper mines. We may be required in the future to revise our reserves estimates based on our actual production. We cannot assure you that our actual reserves conform to geological, metallurgical or other expectations or that the estimated volume and grade of ore will be recovered. Market prices of our metals, increased production costs, reduced recovery rates, short-term operating factors, royalty taxes and other factors may render proven and probable reserves uneconomic to exploit and may result in revisions of reserves data from time to time. Reserves data are not indicative of future results of operations. Our reserves are depleted as we mine. We depend on our ability to replenish our ore reserves for our long-term viability. We use several strategies to replenish and increase our ore reserves, including exploration and investment in properties located near our existing mine sites and investing in technology that could extend the life of a mine by allowing us to cost-effectively process ore types that were previously considered uneconomic. Acquisitions may also contribute to increased ore reserves and we review potential acquisition opportunities on a regular basis.

***Our business requires levels of capital expenditures which we may not be able to maintain.***

Our business is capital intensive. Specifically, the exploration and exploitation of copper and other metal reserves, mining, smelting and refining costs, the maintenance of machinery and equipment and compliance with laws and regulations require capital expenditures. We must continue to invest capital to maintain or to increase the amount of copper reserves that we exploit and the amount of copper and other metals we produce. We cannot assure you that we will be able to maintain our production levels to generate sufficient cash, or that we have access to sufficient financing to continue our exploration, exploitation and refining activities at or above present levels. As a result of the world’s current economic situation, we have suspended most of our capital investment projects.

***Restrictive covenants in the agreements governing our indebtedness and the indebtedness of our Minera Mexico subsidiary may restrict our ability to pursue our business strategies.***

Our financing instruments and those of our Minera Mexico subsidiary include financial and other restrictive covenants that, among other things, limit our and Minera Mexico’s abilities to incur additional debt and sell assets. If either we or our Minera Mexico subsidiary do not comply with these obligations, we could be in default under the applicable agreements which, if not addressed or waived, could require repayment of the indebtedness immediately. Our Minera Mexico subsidiary is further limited by the terms of its outstanding notes, which also restrict the Company’s applicable incurrence of debt and liens. In addition, future credit facilities may contain limitations on our incurrence of additional debt and liens and on our ability to dispose of assets.

***Applicable law restricts the payment of dividends from our Minera Mexico subsidiary to us.***

Minera Mexico is a Mexican company and, as such, may pay dividends only out of net income that has been approved by the shareholders. Shareholders must also approve the actual dividend payment, after mandatory legal reserves have been created and losses for prior fiscal years have been satisfied. As a result, these legal constraints may limit the ability of our Minera Mexico subsidiary to pay dividends to us, which in turn, may have an impact on our ability to service debt.

Through 2008, our management set aside $2.4 billion of unremitted earnings of its Mexican subsidiary, Minera Mexico, as appropriated retained earnings. It is our intention to indefinitely invest these funds in Mexico. These amounts are earmarked for the Company’s Mexican expansion program. See also Note 8 of the consolidated financial statements.

### Our operations are subject to risks, some of which are not insurable.

The business of mining, smelting and refining copper, zinc and other metals is subject to a number of risks and hazards, including industrial accidents, labor disputes, unusual or unexpected geological conditions, changes in the regulatory environment, environmental hazards and weather and other natural phenomena, such as earthquakes. Such occurrences could result in damage to, or destruction of, mining operations resulting in monetary losses and possible legal liability. In particular, surface and underground mining and related processing activities present inherent risks of injury to personnel and damage to equipment. We maintain insurance against many of these and other risks, which may not provide adequate coverage in certain circumstances. Insurance against certain risks, including certain liabilities for environmental damage or hazards as a result of exploration and production, is not generally available to us or other companies within the mining industry. Nevertheless recent environmental legal initiatives have considered future regulations regarding environmental damage insurance. In case such regulations come into force, we will have to analyze the need to obtain such insurance. We do not have, and do not intend to obtain, political risk insurance. These or other uninsured events may adversely affect our financial condition and results of operations.

***The loss of one of our large customers could have a negative impact on our results of operations.***

The loss of one or more of our significant customers could adversely affect our financial condition and results of operations. In 2008, 2007 and 2006, our largest customer accounted for approximately 10.6%, 12.4% and 10.1%, respectively, of our sales. Additionally, our five largest customers in each of 2008, 2007 and 2006 collectively accounted for approximately 35.8%, 39.6% and 33.7%, respectively, of our sales.

***Deliveries under our copper sales agreements can be suspended or cancelled by our customers in certain cases.***

Under each of our copper sales agreements, we or our customers may suspend or cancel delivery of copper during a period of force majeure. Events of force majeure under these agreements include acts of nature, labor strikes, fires, floods, wars, transportation delays, government actions or other events that are beyond the control of the parties. Any suspension or cancellation by our customers of deliveries under our copper or other sales contracts that are not replaced by deliveries under new contracts or sales on the spot market would reduce our cash flow and could adversely affect our financial condition and results of operations.

### The copper mining industry is highly competitive.

We face competition from other copper mining and producing companies around the world. We cannot assure you that competition from lower cost producers will not adversely affect us in the future.

In addition, mines have limited lives and, as a result, we must periodically seek to replace and expand our reserves by acquiring new properties. Significant competition exists to acquire properties producing or capable of producing copper and other metals.

The mining industry has experienced significant consolidation in recent years, including consolidation among some of our main competitors, as a result of which an increased percentage of copper production is from companies that also produce other products and may, consequently, be more diversified than we are. We cannot assure you that the result of current or further consolidation in the industry will not adversely affect us.

Potential changes to international trade agreements, trade concessions or other political and economic arrangements may benefit copper producers operating in countries other than Peru and Mexico, where our mining operations are currently located. We cannot assure you that we will be able to compete on the basis of price or other factors with companies that in the future may benefit from favorable trading or other arrangements.

***Increases in energy costs, accounting policy changes and other matters may adversely affect our results of operations.***

We require substantial amounts of fuel oil, electricity and other resources for our operations. Fuel, gas and power costs constitute approximately 43% of our total 2008 production cost. We rely upon third parties for our supply of the energy resources consumed in our operations. The prices for and availability of energy resources may be subject to change or curtailment, respectively, due to, among other things, new laws or regulations, imposition of new taxes or tariffs, interruptions in production by suppliers, worldwide price levels and market conditions. For example, during the 1970s and 1980s, our ability to import fuel oil was restricted by Peruvian government policies that required us to purchase fuel oil domestically from a government-owned oil producer at prices generally substantially above those prevailing on the world market. In addition, in recent years the price of oil has risen dramatically due to a variety of factors. Disruptions in supply or increases in costs of energy resources could have a material adverse effect on our financial condition and results of operations.

We believe our results of operations can, from time to time, be affected by accounting policy changes, which could have a material adverse effect on our results of operations and our financial position.

Additionally, we expect our future results will continue to be affected by the Peruvian mining royalty charge, which has reduced our earnings since 2004, as further described under Business—Mining Rights and Concessions—Peru.

***Our results and financial condition are affected by global and local market conditions.***

We are subject to the risks arising from adverse changes in domestic and global economic and political conditions. The United States has been in recession since December 2007. Business activity across a wide range of industries and regions has greatly been reduced and many businesses are in serious difficulty due to the lack of consumer spending and the lack of liquidity in the credit markets. Unemployment has increased significantly. Other economies in the world are similarly affected. Our industry is cyclical by nature and fluctuates with economic cycles, including the current global economic recession.

The continued credit crisis and related turmoil in the global financial system has had and may continue to have an impact on our business and our financial condition. The global economic recession and credit crisis in the financial markets may prompt banks to limit or deny lending to us or to our customers, which may have an adverse effect on our liquidity and on our ability to carry out our announced capital investment programs. Additionally, the global economic recession and credit crisis may prompt our customers to slow down or reduce the purchase of our products. We may experience longer sales cycles, difficulty in collecting sales proceeds, and lower prices for our products. A change in the demand of our products could impact our results of operations and financial condition. We cannot provide any assurance that any of these events will not have a material adverse effect on market conditions, prices of our securities, our ability to obtain financing, and our results of operations and financial condition.

### We may be adversely affected by labor disputes.

In the last several years we have experienced a number of strikes or other labor disruptions that have had an adverse impact on our operations and operating results. See “Business—Employees.” We could experience labor disputes, work stoppages or other disruptions in production that could adversely affect us. As of December 31, 2008, unions represented approximately 73% of our workforce.

In the last seven years the Cananea mine has experienced more than nine labor stoppages totaling more than 634 days of inactivity as of December 31, 2008. Beginning in July 2007, our Cananea mine, as well as Taxco and San Martin in Mexico started a work stoppage, which continues into 2009. On January 11, 2008 the Mexican Federal Labor Court declared the Cananea strike illegal and ordered the workers to return to work within 24 hours. The workers partially returned to work and the Company resumed operations. However, on April 11, 2008 the workers restarted the labor stoppage and shut down production, based upon a new federal ruling. On September 4, 2008, the Fourth Labor District Judge granted the Company the right for a new revision regarding a ruling by the federal labor court which will issue a new decision. The Company has tried unsuccessfully to resolve the current labor stoppage that obstructs production at Cananea and in the second quarter 2008, the Board of Directors offered all employees a severance payment in accordance with the collective bargaining agreement and applicable law. This was offered in order to award the employees a significant severance payment that allows them to choose the labor alternative that is best for each of them. During 2008, under this plan a group of employees was terminated at a cost of $15.2 million. In December 2008, the Mexican Federal Labor Court ruled in favor of the Company and declared the strike illegal. The union appealed this decision. On January 7, 2009 the judge of the fifth district on labor matters annulled the favorable decision to the Company. The Company has filed a request for a review of this ruling before an appellate federal court. The Company will continue to pursue a favorable resolution of the labor stoppage.

The Company has the right to resume operations at the mine with those workers who wish to continue. Nevertheless some strikers have illegally blocked the entrance to the unit. The Company has filed two successive complaints before an upper court in order to require the Fifth District judge to safeguard the Company’s right to operate.

Additionally, during 2006, there were a number of work stoppages at some of our other Mexican operations. While some of these work stoppages were of a short-term nature with little or no production loss, others have been more disruptive. A strike at the La Caridad copper mine in Sonora began in the first quarter of 2006 and ended in July 2006. As a result of these strikes, we were forced to declare “force majeure” on certain of our June and July copper contracts. In 2006, we also experienced strikes at our Cananea and San Martin mines.

Collective bargaining agreements with the Company’s Peruvian labor unions expired in 2007. A number of strikes were initiated by the Company’s labor unions, demanding wage increases and better benefits. In addition, some of the unions went on strike in support of national union strikes. These strikes were generally of a brief nature and the Company was able to continue normal operations with the support of staff and administrative personnel and contractors. New collective bargaining agreements, for periods ranging from three to six years were signed with all of the Company’s unions.

***Environmental, health and safety laws and other regulations may increase our costs of doing business, restrict our operations or result in operational delays.***

Our exploration, mining, milling, smelting and refining activities are subject to a number of Peruvian and Mexican laws and regulations, including environmental laws and regulations, as well as certain industry technical standards. Additional matters subject to regulation include, but are not limited to, concession fees, transportation, production, water use and discharge, power use and generation, use and storage of explosives, surface rights, housing and other facilities for workers, reclamation, taxation, labor standards, mine safety and occupational health.

Environmental regulations in Peru and Mexico have become increasingly stringent over the last decade and we have been required to dedicate more time and money to compliance and remediation activities. Furthermore, Mexican authorities have become more rigorous and strict in enforcing Mexican environmental laws. We expect additional laws and regulations will be enacted over time with respect to environmental matters. Recently, Peruvian environmental laws have been enacted imposing closure and remediation obligations on the mining industry. Moreover, our Mexican operations are also subject to the environmental agreement entered into by Mexico, the United States and Canada in connection with the North American Free Trade Agreement. We believe our operations are in compliance with all environmental laws and regulations within the areas we operate.

The development of more stringent environmental protection programs in Peru and Mexico and in relevant trade agreements could impose constraints and additional costs on our operations and require us to make significant capital expenditures in the future. We cannot assure you that future legislative, regulatory or trade developments will not have an adverse effect on our business, properties, results of operations, financial condition or prospects.

***Our metals exploration efforts are highly speculative in nature and may be unsuccessful.***

Metals exploration is highly speculative in nature, involves many risks and is frequently unsuccessful. Once mineralization is discovered, it may take a number of years from the initial phases of drilling before production is possible, during which time the economic feasibility of production may change. Substantial expenditures are required to establish proven and probable ore reserves through drilling, to determine metallurgical processes to extract the metals from the ore and, in the case of new properties, to construct mining and processing facilities. We cannot assure you that our exploration programs will result in the expansion or replacement of current production with new proven and probable ore reserves.

Development projects have no operating history upon which to base estimates of proven and probable ore reserves and estimates of future cash operating costs. Estimates are, to a large extent, based upon the interpretation of geological data obtained from drill holes and other sampling techniques, and feasibility studies that derive estimates of cash operating costs based upon anticipated tonnage and grades of ore to be mined and processed, the configuration of the ore body, expected recovery rates of the mineral from the ore, comparable facility and equipment operating costs, anticipated climatic conditions and other factors. As a result, actual cash operating costs and economic returns based upon development of proven and probable ore reserves may differ significantly from those originally estimated. Moreover, significant decreases in actual or expected prices may mean reserves, once found, will be uneconomical to produce.

### Our profits may be negatively affected by currency exchange rate fluctuations.

The U.S. dollar is our functional currency and our revenues are primarily denominated in U.S. dollars. However, portions of our operating costs are denominated in Peruvian nuevos soles and Mexican pesos. Accordingly, when inflation in Peru or Mexico increases without a corresponding devaluation of the nuevo sol or the Mexican peso our financial position, results of operations and cash flows could be adversely affected. To manage the volatility related to the risk of currency rate fluctuations, we may enter into forward exchange contracts. We cannot assure you, however, that currency fluctuations will not have an impact on our financial condition and results of operations.

Our assets, earnings and cash flows are influenced by various currencies due to the geographic diversity of our sales and the countries in which we operate. As some of our costs are incurred in currencies other than our functional currency, the U.S. dollar, fluctuations in currency exchange rates may have a significant impact on our financial results. These costs principally include electricity, labor, maintenance, local contractors and fuel. For the year ended December 31, 2008, a substantial portion of our costs were denominated in a currency other than U.S. dollar. Operating costs are influenced by the currencies of the countries where our mines and processing plants are located and also by those currencies in which the costs of equipment and services are determined. The Peruvian nuevo sol, the Mexican peso and the U.S. dollar are the most important currencies influencing our costs.

Further, in the past there has been a strong correlation between copper prices and the exchange rate of the U.S. dollar. A strengthening of the U.S. dollar may therefore be accompanied by lower copper prices, which would negatively affect our financial condition and results of operations.

### We may be adversely affected by challenges relating to slope stability.

Our open-pit mines get deeper as we mine them, presenting certain geotechnical challenges including the possibility of slope failure. If we are required to decrease pit slope angles or provide additional road access to prevent such a failure, our stated reserves could be negatively affected. Further, hydrological conditions relating to pit slopes, renewal of material displaced by slope failures and increased stripping requirements could also negatively affect our stated reserves. We have taken actions in order to maintain slope stability, but we cannot assure you that we will not have to take additional action in the future or that our actions taken to date will be sufficient. Unexpected failure or additional requirements to prevent slope failure may negatively affect our results of operations and financial condition, as well as have the effect of diminishing our stated ore reserves.

### Litigation involving Asarco may adversely affect us.

Our direct and indirect parent corporations, including AMC and Grupo Mexico, have from time to time been named parties in various litigations involving Asarco LLC (“Asarco”). In August 2002 the U.S. Department of Justice brought a claim alleging fraudulent conveyance in connection with AMC’s then-proposed purchase of SCC from Asarco. That action was settled pursuant to a Consent Decree dated February 2, 2003. In March 2003, AMC purchased its interest in SCC from a subsidiary of Asarco. In October 2004, AMC, Grupo Mexico, Mexicana de Cobre and other parties, not including SCC, were named in a lawsuit filed in New York State court in connection with alleged asbestos liabilities, which lawsuit claims, among other matters, that AMC’s purchase of SCC from Asarco should be voided as a fraudulent conveyance. The lawsuit filed in New York State court was stayed as a result of the August 2005 Chapter 11 bankruptcy filing by Asarco, as described below. However, on November 16, 2007, this lawsuit, after being removed to federal court, was transferred to the United States District Court for the Southern District of Texas in Brownsville, Texas, for resolution in conjunction with a new lawsuit filed by Asarco, the debtor in possession. On February 2, 2007 a complaint was filed by Asarco, the debtor in possession, alleging many of the matters previously claimed in the New York State lawsuit, including that AMC’s purchase of SCC from Asarco should be voided as a fraudulent conveyance. In June 2008 the lawsuit was concluded in Brownsville, Texas. The constructive fraudulent conveyance claim was dismissed; however the actual fraud and the aiding and abetting the breach of fiduciary duties counts were favorable to plaintiffs. The court’s decision did not determine the damage amount. Grupo Mexico has stated they will appeal the ruling. In late December 2004 and early January 2005, three purported class action derivative lawsuits were filed in the Delaware Court of Chancery (New Castle County) relating to the merger transaction between SCC and Minera Mexico. On January 31, 2005, the three actions were consolidated. The complaint alleges, among other things, that the merger was the result of breaches of fiduciary duties by SCC’s directors and was not entirely fair to SCC and its minority stockholders. The case is currently in the early stages of discovery. The defendants believe that the lawsuit is without merit and are vigorously defending the action. While Grupo Mexico and its affiliates believe that these claims are without merit, the Company cannot assure you that these or future claims, if successful, will not have an adverse effect on the Company’s parent corporation or the Company. Any increase in the financial obligations of the Company’s parent corporation, as a result of matters related to Asarco or otherwise could, among other effects, result in the Company’s parent corporation attempting to obtain increased dividends or other funding from the Company. In 2005, certain subsidiaries of Asarco filed bankruptcy petitions in connection with alleged asbestos liabilities. In July 2005, the unionized workers of Asarco commenced a work stoppage. As a result of various factors, including the above-mentioned work stoppage, in August 2005 Asarco filed a voluntary petition for relief under Chapter 11 of the U.S. Bankruptcy Code before the U.S. Bankruptcy Court in Corpus Christi, Texas. Asarco’s bankruptcy case is being joined with the bankruptcy cases of its subsidiaries. Asarco’s bankruptcy could result in additional claims being filed against Grupo Mexico and its subsidiaries, including SCC, Minera Mexico or its subsidiaries.

***We are controlled by Grupo Mexico, which exercises control over our affairs and policies and whose interests may be different from yours.***

Grupo Mexico owns indirectly approximately 79.0% of our capital stock. Certain of our and Minera Mexico’s officers and directors are also officers of Grupo Mexico. We cannot assure you that the interests of Grupo Mexico will not conflict with ours.

Grupo Mexico has the ability to determine the outcome of substantially all matters submitted for a vote to our stockholders and thus exercises control over our business policies and affairs, including the following:

- the composition of our board of directors and, as a result, any determinations of our board with respect to our business direction and policy, including the appointment and removal of our officers;
- determinations with respect to mergers and other business combinations, including those that may result in a change of control;
- whether dividends are paid or other distributions are made and the amount of any dividends or other distributions;
- sales and dispositions of our assets; and
- the amount of debt financing that we incur.

In addition, we and Minera Mexico have in the past engaged in, and expect to continue to engage in, transactions with Grupo Mexico and its other affiliates which are related party transactions and may present conflicts of interest. For additional information regarding the share ownership of, and our relationships with, Grupo Mexico and its affiliates, see “Related Party Transactions.”

***We may not continue to pay a significant amount of our net income as cash dividends on our common stock in the future.***

We have distributed a significant amount of our net income as dividends since 1996. Our dividend practice is subject to change at the discretion of our Board of Directors at any time. The amount that we pay in dividends is subject to a number of factors, including our results of operations, financial condition, cash requirements, tax considerations, future prospects, legal restrictions, contractual restrictions in credit agreements, limitations imposed by the government of Peru, Mexico or other countries where we have significant operations and other factors that our board of directors may deem relevant. In light of our expansion program and the current global economic recession and credit crisis we expect that future dividend distributions will be reduced from the levels of recent years.

### Risks Associated with Doing Business in Peru and Mexico

***There is uncertainty as to the termination and renewal of our mining concessions.***

Under the laws of Peru and Mexico, mineral resources belong to the state and government concessions are required in both countries to explore for or exploit mineral reserves. In Peru, our mineral rights derive from concessions from the Peruvian Ministry of Energy and Mines for our exploration, exploitation, extraction and/or production operations. In Mexico, our mineral rights derive from concessions granted, on a discretionary basis, by the Ministry of Economy, pursuant to the Mining Law and regulations thereunder.

Mining concessions in both Peru and Mexico may be terminated if the obligations of the concessionaire are not satisfied. In Peru, we are obligated to pay certain fees for our mining concession. In Mexico, we are obligated, among other things, to explore or exploit the relevant concession, to pay any relevant fees, to comply with all environmental and safety standards, to provide information to the Ministry of Economy and to allow inspections by the Ministry of Economy. Any termination or unfavorable modification of the terms of one or more of our concessions, or failure to obtain renewals of such concessions subject to renewal or extensions, could have a material adverse effect on our financial condition and prospects.

***Peruvian economic and political conditions may have an adverse impact on our business.***

A significant part of our operations are conducted in Peru. Accordingly, our business, financial condition or results of operations could be affected by changes in economic or other policies of the Peruvian government or other political, regulatory or economic developments in Peru. During the past several decades, Peru has had a history of political instability that has included military coups and a succession of regimes with differing policies and programs. Past governments have frequently intervened in the nation’s economy and social structure. Among other actions, past governments have imposed controls on prices, exchange rates and local and foreign investment as well as limitations on imports, have restricted the ability of companies to dismiss employees, have expropriated private sector assets (including mining companies) and have prohibited the remittance of profits to foreign investors.

There is a risk of terrorism in Peru relating to *Sendero Luminoso* and the *Movimiento Revolucionario Tupac Amaru*, which were particularly active in the 1980s and early 1990s. To a much lesser degree terrorist incidents have continued in some rural areas of the country.

Because we have significant operations in Peru, we cannot provide any assurance that political developments and economic conditions in Peru and/or terrorist activity will not have a material adverse effect on market conditions, prices of our securities, our ability to obtain financing, and our results of operations and financial condition.

***Mexican economic and political conditions may have an adverse impact on our business.***

A significant part of our operations are based in Mexico. In the past, Mexico has experienced both prolonged periods of weak economic conditions and dramatic deterioration in economic conditions, characterized by exchange rate instability and significant devaluation of the peso, increased inflation, high domestic interest rates, a substantial outflow of capital, negative economic growth, reduced consumer purchasing power and high unemployment. An economic crisis occurred in 1995 in the context of a series of internal disruptions and political events including a large current account deficit, civil unrest in the southern state of Chiapas, the assassination of two prominent political figures, a substantial outflow of capital and a significant devaluation of the peso.

A general election was held in Mexico on July 2, 2006, with Mr. Felipe Calderon as the winner. The results were contested and recounts were made. Nevertheless, on December 1, 2006, Mr. Calderon was sworn in as president of Mexico.

Because we have significant operations in Mexico, we cannot provide any assurance that political developments and economic conditions in Mexico, will not have a material adverse effect on market conditions, prices of our securities, our ability to obtain financing, and our results of operations and financial condition.

***Peruvian inflation reduced economic growth and fluctuations in the nuevo sol exchange rate may adversely affect our financial condition and results of operations.***

Over the past several decades, Peru has experienced periods of high inflation, slow or negative economic growth and substantial currency devaluation. The inflation rate in Peru, as measured by the *Indice de Precios al Consumidor* (Consumer Price Index) and published by the *Instituto Nacional de Estadistica e Informatica*, (National Institute of Statistics and Informatics), has fallen from a high of 7,649.7% in 1990 to 6.7% in 2008. The Peruvian currency has been devalued numerous times during the last 20 years. The devaluation rate has decreased from a high of 4,019.3% in 1990 to 4.8% in 2008. Our revenues are primarily denominated in U.S. dollars and our operating expenses are partly denominated in U.S. dollars. If inflation in Peru were to increase without a corresponding devaluation of the nuevo sol relative to the U.S. dollar, our financial position and results of operations, and the market price of our common stock, could be affected. Although the Peruvian government’s economic policy reduced inflation and the Peruvian economy has experienced a significant growth in recent years, we cannot assure you that inflation will not increase from its current level or that such growth will continue in the future at similar rates or at all.

Among the economic circumstances that could lead to a devaluation of the nuevo sol is the decline of Peruvian foreign reserves to inadequate levels. Peru’s foreign reserves at December 31, 2008, were $31.2 billion as compared to $27.7 billion and $17.3 billion at December 31, 2007 and 2006, respectively. We cannot assure that Peru will be able to maintain adequate foreign reserves to meet its foreign currency denominated obligations or that Peru will not devalue its currency should its foreign reserves decline.

***Mexican inflation, restrictive exchange control policies and fluctuations in the peso exchange rate may adversely affect our financial condition and results of operations.***

Although all of our Mexican operations’ sales of metals are priced and invoiced in U.S. dollars, a substantial portion of our Mexican operations’ cost of sales are denominated in pesos. Accordingly, when inflation in Mexico increases without a corresponding devaluation of the peso, as it did in 2000, 2001 and 2002, the net income generated by our Mexican operations is adversely affected.

The annual inflation rate in Mexico was 6.5% in 2008, 3.8% in 2007 and 4.1% in 2006. The Bank of Mexico has publicly announced an objective of 3% inflation for 2009. At the same time, the peso has been subject in the past to significant devaluation, which may not have been proportionate to the inflation rate and may not be proportionate to the inflation rate in the future. The value of the peso decreased by 24.5% in 2008, increased by 0.1% in 2007 and decreased by 1.5% in 2006.

While the Mexican government does not currently restrict the ability of Mexican companies or individuals to convert pesos into dollars or other currencies, in the future, the Mexican government could impose a restrictive exchange control policy, as it has done in the past. We cannot assure you that the Mexican government will maintain its current policies with regard to the peso or that the peso’s value will not fluctuate significantly in the future. The imposition of such exchange control policies could impair Minera Mexico’s ability to obtain imported goods and to meet its U.S. dollar-denominated obligations and could have an adverse effect on our business and financial condition.

***Developments in other emerging market countries and in the United States may adversely affect the prices of our common stock and our debt securities.***

The market value of securities of companies with significant operations in Peru and Mexico is, to varying degrees, affected by economic and market conditions in other emerging market countries. Although economic conditions in such countries may differ significantly from economic conditions in Peru or Mexico, as the case may be, investors’ reactions to developments in any of these other countries may have an adverse effect on the market value or trading price of the securities, including debt securities, of issuers that have significant operations in Peru or Mexico.

In addition, in recent years economic conditions in Mexico have increasingly become correlated to U.S. economic conditions. Therefore, adverse economic conditions in the United States could also have a significant adverse effect on Mexican economic conditions, including the price of our common stock or debt securities.

We cannot assure you that the market value or trading prices of our common stock and debt securities, will not be adversely affected by events in the United States or elsewhere, including in emerging market countries.

## Properties

As filed, 120,220 characters.

We were incorporated in Delaware in 1952. Our corporate offices in the United States are located at 11811 North Tatum Blvd. Suite 2500, Phoenix, Arizona 85028. Our telephone number in Phoenix, Arizona is (602) 494-5328. Our corporate offices in Mexico are located in Mexico City and our corporate offices in Peru are located in Lima. Our website is www.southerncoppercorp.com. We believe that our existing properties are in good condition and suitable for the conduct of our business.

REVIEW OF OPERATIONS

The following maps set forth the locations of our principal mines, smelting facilities and refineries. We operate open-pit copper mines in the southern part of Peru — at Toquepala and Cuajone — and in Mexico, principally at La Caridad and Cananea. We also operate five underground mines that produce zinc, copper, silver and gold, as well as a coal mine and a coke oven.

#### EXTRACTION, SMELTING AND REFINING PROCESSES

Our operations include open-pit and underground mining, concentrating, copper smelting, copper refining, copper rod production, solvent extraction/electrowinning (SX/EW), zinc refining, sulfuric acid production, molybdenum concentrate production and silver and gold refining. The extraction and production process are summarized below.

#### OPEN-PIT MINING

In an open-pit mine, the production process begins at the mine pit, where waste rock, leaching ore and copper ore are drilled and blasted and then loaded onto diesel-electric trucks by electric shovels. Waste is hauled to dump areas and leaching ore is hauled to leaching dumps. The ore to be milled is transported to the primary crushers.

#### UNDERGROUND MINING

In an underground mine, the production process begins at the stopes, where copper, zinc and lead veins are drilled and blasted and the ore is hauled to the underground crusher station. The crushed ore is then hoisted to the surface for processing.

#### CONCENTRATING

The copper ore with a copper grade over 0.4% from the primary crusher or the copper, zinc and lead-bearing ore from the underground mines is transported to a concentrator plant where gyratory crushers break the ore into sizes no larger than three-quarters of an inch. The ore is then sent to a mill section where it is ground to the consistency of fine powder. The finely ground ore is mixed with water and chemical reagents and pumped as a slurry to the flotation separator where it is mixed with certain chemicals. In the flotation separator, reagents solution and air pumped into the flotation cells cause the minerals to separate from the waste rock and bubble to the surface where they are collected and dried.

If the bulk concentrated copper contains molybdenum it is first processed in a molybdenum plant as described below under “Molybdenum Production.”

#### COPPER SMELTING

Copper concentrates are transported to a smelter, where they are smelted using a furnace, converter and anode furnace to produce either copper blister (which is in the form of cakes with air pockets) or copper anodes (which are cleaned of air pockets). At the smelter, the concentrates are mixed with flux (a chemical substance intentionally included for high temperature processing) and then sent to reverberatory furnaces producing copper matte and slag (a mixture of iron and other impurities). Copper matte contains approximately 65% copper. Copper matte is then sent to the converters, where the material is oxidized in two steps: (i) the iron sulfides in the matte are oxidized with silica, producing slag that is returned to the reverberatory furnaces, and (ii) the copper contained in the matte sulfides is then oxidized to produce copper that, after casting, is called blister copper, containing approximately 98% to 99% copper, or anodes, containing approximately 99.7% copper. Some of the blister and anode production is sold to customers and the remainder is sent to the refinery.

#### COPPER REFINING

Anodes are suspended in tanks containing sulfuric acid and copper sulfate. A weak electrical current is passed through the anodes and chemical solution and the dissolved copper is deposited on very thin starting sheets to produce copper cathodes containing approximately 99.99% copper. During this process, silver, gold and other metals (for example, palladium, platinum and selenium), along with other impurities, settle on the bottom of the tank (anodic slime). This anodic slime is processed at a precious metal plant where selenium, silver and gold are recovered.

#### COPPER ROD PLANT

To produce copper rod, copper cathodes are first smelted in a furnace and then dosified in a casting machine. The dosified copper is then extruded and passed through a cooling system that begins solidification of copper into a 60´50 millimeter copper bar. The resulting copper bar is gradually stretched in a rolling mill to achieve the desired diameter. The rolled bar is then cooled and sprayed with wax as a preservation agent and collected into a rod coil that is compacted and sent to market.

#### SOLVENT EXTRACTION/ELECTROWINNING (SX/EW)

An alternative to the conventional concentrator/smelter/refinery process is the leaching and SX/EW process. During the SX/EW process, certain types of low-grade ore with a copper grade under 0.4% are leached with sulfuric acid to allow copper content recovery. The acid and copper solution is then agitated with a solvent that contains chemical additives that attract copper ions. As the solvent is lighter than water, it floats to the surface carrying with it the copper content. The solvent is then separated using an acid solution, freeing the copper. The acid solution containing the copper is then moved to electrolytic extraction tanks to produce copper cathodes. Refined copper can be produced more economically (though over a longer period) and from lower grade ore using the SX/EW process instead of the traditional concentrating, smelting and refining process.

#### MOLYBDENUM PRODUCTION

Molybdenum is recovered from copper-molybdenum concentrates produced at the concentrator. The copper-molybdenum concentrate is first treated with a thickener until it becomes slurry with 60% solids. The slurry is then agitated in a chemical and water solution and pumped to the flotation separator. The separator creates a froth that carries molybdenum to the surface but not the copper mineral (which is later filtered to produce copper concentrates containing approximately 27% copper). The molybdenum froth is skimmed off, filtered and dried to produce molybdenum concentrates of approximately 58% contained molybdenum.

#### ZINC REFINING

Metallic zinc is produced through electrolysis using zinc concentrates and zinc oxides. Sulfur is eliminated from the concentrates by roasting and the zinc oxide is dissolved in sulfuric acid solution to eliminate solid impurities. The purified zinc sulfide solution is treated by electrolysis to produce refined zinc and to separate silver and gold, which are recovered as concentrates.

#### SULFURIC ACID PRODUCTION

Sulfur dioxide gases are produced in the copper smelting and zinc roasting processes. As a part of our environmental preservation program, we treat the sulfur dioxide emissions at two of our Mexican plants and at Peruvian processing facilities to produce sulfuric acid, some of which is, in turn, used for the copper leaching process, with the rest sold to mining and fertilizer companies located principally in Mexico, Peru, the United States, Chile and other countries.

#### SILVER AND GOLD REFINING

Silver and gold are recovered from copper, zinc and lead concentrates in the smelters and refineries, and from slimes through electrolytic refining.

#### KEY PRODUCTION CAPACITY DATA:

All production facilities are owned by the Company. The following table sets forth as of December 31, 2008, the locations of production facilities by reportable segment, the processes used, as well as the key production and capacity data for each location:

| Facility Name PERUVIAN OPEN PIT UNIT Mining Operations | Location | Process | Nominal Capacity (1) | 2008 Production | 2008 Capacity Utilization |
| --- | --- | --- | --- | --- | ---: |
| Cuajone Open-pit Mine | Cuajone (Peru) | Copper ore milling and recovery, copper and molybdenum concentrate production | 87.0 ktpd — Milling | 83.8 ktpd | 96.3 % |
| Toquepala Open-pit Mine | Toquepala (Peru) | Copper ore milling and recovery, copper and molybdenum concentrate production | 60.0 ktpd — Milling | 59.8 ktpd | 99.7 % |
| Toquepala SX-EW Plant | Toquepala (Peru) | Leaching, solvent extraction and cathode electro winning | 56.0 ktpy — Refined | 40.1 ktpy | 71.6 % |
| **Processing Operations** |  |  |  |  |  |
| Ilo Copper Smelter | Ilo (Peru) | Copper smelting, blister, anodes production | 1,200.0 ktpy — Concentrate feed | 1,003.3 ktpy | 83.6 % |
| Ilo Copper Refinery | Ilo (Peru) | Copper refining | 280 ktpy — Refined cathodes | 248.7 ktpy | 88.8 % |
| Ilo Acid Plants | Ilo (Peru) | Sulfuric Acid | 1,050 ktpy — Sulfuric acid | 958.6 ktpy | 91.2 % |
| Ilo Precious Metals Refinery | Ilo (Peru) | Slime recovery & processing, gold & silver refining | 320 tpy | 294.0 tpy | 91.9 % |
| **MEXICAN OPEN PIT UNIT** |  |  |  |  |  |
| Cananea Open-Pit Mine (2) | Sonora (Mexico) | Copper Ore milling & recovery, copper concentrate production | 76.7 ktpd — Milling | 16.7 ktpd | 21.8 % |
| Cananea SX-EW I, II Plants (2) | Sonora (Mexico) | Leaching, solvent extraction & refined cathode electrowinning | 54.8 ktpy (combined) | 9.5 ktpy | 17.3 % |
| La Caridad Open-Pit Mine | Sonora (Mexico) | Copper ore milling & recovery, copper & molybdenum concentrate production | 90.0 ktpd — Milling | 86.3 ktpd | 95.9 % |
| La Caridad SX-EW Plant | Sonora (Mexico) | Leaching, solvent extraction & cathode electro winning | 21.9 ktpy — Refined | 22.0 ktpy | 100.5 % |

32

| Processing Operations |  |  |  |  |  |
| --- | --- | --- | --- | --- | ---: |
| La Caridad Copper Smelter | Sonora (Mexico) | Concentrate smelting, anode production | 1,000 ktpy — Concentrate feed | 574.6 ktpy | 57.5 % |
| La Caridad Copper Refinery | Sonora (Mexico) | Copper refining | 300 ktpy Copper cathode | 140.3 ktpy | 46.8 % |
| La Caridad Copper Rod Plant | Sonora (Mexico) | Copper rod production | 150 ktpy Copper rod | 76.3 ktpy | 50.9 % |
| La Caridad Precious Metals Refinery | Sonora (Mexico) | Slime recovery & processing, gold & silver refining | 2.8 ktpy — Slime | 0.6 ktpy | 21.4 % |
| La Caridad Sulfuric Acid Plant | Sonora (Mexico) | Sulfuric acid | 1,565.5 ktpy — Sulfuric acid | 578.2 ktpy | 36.9 % |
| **IMMSA UNIT** |  |  |  |  |  |
| Underground Mines |  |  |  |  |  |
| Charcas | San Luis Potosi (Mexico) | Copper, zinc, lead milling, recovery & concentrate production | 1,460 ktpy — Milled ore | 1,168.7 ktpy | 80.1 % |
| San Martin (2) | Zacatecas (Mexico) | Lead, zinc, copper & silver mining, milling recovery & concentrate production | 1,606 ktpy — Milled ore | 0.0 ktpy | 0.0 % |
| Santa Barbara | Chihuahua (Mexico) | Lead, copper and zinc mining & concentrates production | 2,190 ktpy - Milled ore | 1,450.5 ktpy | 66.2 % |
| Santa Eulalia | Chihuahua (Mexico) | Lead & zinc mining and milling recovery & concentrate production | 547.5 ktpy — Milled ore | 280.9 ktpy | 51.3 % |
| Taxco (2) | Guerrero (Mexico) | Lead, zinc silver & gold mining recovery & concentrate production | 730 ktpy — Milled ore | 0.0 ktpy | 0.0 % |
| Nueva Rosita Coal & Coke Complex(3) | Coahuila (Mexico) | Clean coal production | 900 ktpy clean coal 100 ktpy coke | 71.3 ktpy 70.3 ktpy | 15.8 % 70.3 % |
| **Processing Operations** |  |  |  |  |  |
| San Luis Potosi Copper Smelter | San Luis Potosi (Mexico) | Concentrate smelting, blister production | 60 ktpy concentrate feed 24.0 ktpy blister production | 40.9 ktpy 19.0 ktpy | 82.2 % 79.2 % |
| San Luis Potosí Zinc Refinery | San Luis Potosi (Mexico) | Zinc concentrates refining | 105.0 ktpy zinc cathode | 95.4 ktpy | 90.9 % |
| San Luis Potosi Sulfuric Acid Plant | San Luis Potosi (Mexico) | Sulfuric acid | 180.0 ktpy sulfuric acid | 162.1 ktpy | 90.1 % |

Key: ktpd = thousands of tons per day

ktpy = thousands of tons per year

tpy = tons per year

(1) Our estimates of actual capacity contemplating normal operating conditions with allowance for normal downtime for repairs and maintenance and based on the average metal content for the relevant period.

(2) During 2008, there were 278 days of illegal strike work stoppage at Cananea and there was no production at Taxco and San Martin in 2008, due to illegal work stoppages.

(3) At December 31, 2008, the coal reserves for the Nueva Rosita coal plant were 66,038,000 tons with average sulfur content of 1.78% and a BTU content of 9,054.9 per pound.

#### PROPERTIES BOOK VALUE

At December 31, 2008, net book values of property are as follows:

Peruvian operations $1,846.7 million: Cuajone $396.7 million, Toquepala $624.8 million, Tia Maria Project $118.0 million and Ilo and other support facilities $707.2 million.

Mexican open pit operations: $1,644.5 million: (Cananea $559.4 million, La Caridad $1,081.2 million, property in progress and other facilities $3.9 million) and

Mexican IMMSA unit: $271.1 million (San Luis Potosi $40.5 million, zinc electrolytic refinery $62.2 million, Charcas $13.9 million, San Martin $33.6 million, Santa Barbara $56.4 million, Taxco $6.3 million, Santa Eulalia $17.7 million, Pasta de Conchos and Nueva Rosita $23.1 million and property in progress and other facilities $17.4 million).

SUMMARY OPERATING DATA

The following table sets out certain operating data underlying our financial and operating information for each of the periods indicated.

| COPPER (thousand pounds): Mined Peru open pit | Year Ended December 31, 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Toquepala | 251,651 | 310,560 | 334,605 |
| Cuajone | 432,249 | 401,498 | 384,493 |
| SX-EW Toquepala | 85,537 | 80,844 | 78,935 |
| **Mexico open pit** |  |  |  |
| La Caridad | 213,691 | 225,443 | 128,024 |
| Cananea | 13,591 | 140,896 | 245,331 |
| SX-EW La Caridad | 48,422 | 50,072 | 24,796 |
| SX-EW Cananea | 20,811 | 76,265 | 115,794 |
| **IMMSA Unit** | 11,949 | 19,961 | 23,270 |
| **Total Mined** | **1,077,901** | **1,305,539** | **1,335,248** |
| **Smelted** |  |  |  |
| **Peru open pit** |  |  |  |
| Blister Ilo | — | 20,466 | 67,364 |
| Anodes Ilo | 675,903 | 511,906 | 656,016 |
| **Mexico open pit** |  |  |  |
| Anodes La Caridad | 379,000 | 446,894 | 530,592 |
| **IMMSA Unit** |  |  |  |
| Blister IMMSA | 41,881 | 45,894 | 44,518 |
| **Total Smelted** | **1,096,784** | **1,025,160** | **1,298,490** |
| **Refined** |  |  |  |
| **Peru Open Pit** |  |  |  |
| Cathodes Ilo | 548,381 | 393,297 | 602,520 |
| SX-EW Toquepala | 88,511 | 88,920 | 78,935 |
| **Mexico Open Pit** |  |  |  |
| Cathodes La Caridad | 309,366 | 382,152 | 441,705 |
| SX-EW La Caridad | 48,422 | 50,072 | 24,796 |
| SX-EW Cananea | 20,811 | 76,265 | 115,794 |
| **Total Refined** | **1,015,491** | **990,706** | **1,263,750** |
| **Rod Mexico Open Pit** |  |  |  |
| La Caridad | 168,172 | 212,978 | 212,923 |
| **Total Rod** | **168,172** | **212,978** | **212,923** |
| **SILVER (thousand ounces)** |  |  |  |
| **Mined** |  |  |  |
| **Peru Open Pit** |  |  |  |
| Toquepala | 1,591 | 2,047 | 2,083 |
| Cuajone | 2,482 | 2,219 | 2,141 |
| **Mexico Open Pit** |  |  |  |
| La Caridad | 1,796 | 1,893 | 1,055 |
| Cananea | 81 | 798 | 1,616 |
| **IMMSA Unit** | 6,366 | 8,272 | 9,276 |
| **Total Mined** | **12,316** | **15,229** | **16,171** |
| **Refined** |  |  |  |
| Peru Open Pit — Ilo | 2,971 | 2,657 | 3,831 |
| Mexico Open Pit — La Caridad | 4,386 | 3,539 | 4,211 |
| IMMSA Unit | 3,484 | 3,805 | 4,337 |
| **Total Refined** | **10,841** | **10,001** | **12,379** |
| **MOLYBDENUM (thousand pounds)** |  |  |  |
| **Mined** |  |  |  |
| Toquepala | 10,289 | 13,730 | 12,815 |
| Cuajone | 9,793 | 8,424 | 7,767 |
| La Caridad | 16,052 | 13,578 | 5,514 |
| **Total Mined** | **36,134** | **35,732** | **26,096** |
| **ZINC (thousand pounds)** |  |  |  |
| Mined IMMSA | 235,718 | 266,787 | 301,133 |
| Refined IMMSA | 210,365 | 200,105 | 112,513 |

SLOPE STABILITY:

Peruvian Operations

The Toquepala and Cuajone pits are approximately 700 meters and 800 meters deep, respectively, under the present mine plan configuration both pits will reach a depth of 1,200 meters. The deepening pit presents us with a number of geotechnical challenges. Perhaps the foremost concern is the possibility of slope failure, a possibility that all open pit mines face. In order to maintain slope stability, in the past we have decreased pit slope angles, installed additional or duplicate haul road access, and increased stripping requirements. We have also responded to hydrological conditions and removed material displaced by a slope failure. There is no assurance that we will not have to take these or other actions in the future, any of which may negatively affect our results of operations and financial condition, as well as have the effect of diminishing our stated ore reserves. To meet the geotechnical challenges relating to slope stability of the open pit mines, we have taken the following steps:

In the late 1990’s we hosted round table meetings in Vancouver, B.C. with a group of recognized slope stability and open pit mining specialists. The agenda for these meetings was principally a review of pit design for mines with greater than 700 meter depth. The discussions included practices for monitoring, data collection and blasting processes.

Based on the concepts defined at the Vancouver meetings, we initiated slope stability studies to define the mining of reserves by optimum design. These studies were performed by outside consultants and included slope stability appraisals, evaluation of the numerical modeling, slope performance and inter-ramp angle design and evaluation of hydrological conditions.

The studies were completed in 2000 and we believe we implemented the study recommendations. One of the major changes implemented was slope angle reduction at both mines, Toquepala by an average of five degrees and Cuajone by an average of seven degrees. Although this increased the waste included in the mineable reserve calculation, it also improved the stability of the pits.

In the Toquepala mine in 2007 we installed 20 meter wide geotechnical berms every 10 benches. We believe this will further strengthen the stability of the Toquepala pit.

Since 1998, a wall depressurization program has been in place in both pits. This consists of a horizontal drilling program, which improves drainage thereby reducing saturation and increasing wall stability. Additionally, a new blasting control program was put in place, implementing vibration monitoring and blasting designs of low punctual energy. Also a new slope monitoring system was implemented using reflection prisms, deformation inclinometers and piezometers for water level control, as well as real-time robotic monitoring equipment.

To increase the possibility of mining in the event of a slide, we have provided for two ramps of extraction for each open pit mine.

While these measures cannot guarantee that a slope failure will not occur, we believe that our mining practices are sound and that the steps taken and the ongoing reviews performed are a prudent methodology for open pit mining.

In 2004, our 15-year mine plan study for the La Caridad mine was awarded to an independent consulting firm to conduct a geotechnical evaluation. The purpose of the plan was to develop a program of optimum bench design and inter-ramp slope angles for the open pit. A number of recommendations and observations were presented by the consultants. These included a recommendation of a maximum average bench face angle of 72 degrees. Additionally, single benching was recommended for the upper sections of the west, south and east walls of the main pit. Likewise, double benching was recommended for the lower levels of the main pit and single benching for the upper slope segments that consist of either alluvial material, mine waste dumps or mineralized stockpile material. Alternatively, slopes in these types of materials, may be designed with an overall 37 degree slope. We are currently reviewing these recommendations, but since final pit limits have not been yet established at La Caridad, all current pit walls are effectively working slopes. Geostructural and geotechnical data collected at the open pit mine from cell-mapping and oriented-core drilling databases provided the basis for the geotechnical evaluation and recommendations. We are also collecting new information related to geotechnical data from the last drill hole drilled in 2008.

A geotechnical evaluation, of the Cananea 15-year pit slope design, was prepared by an independent mine consulting firm. Results of the study included slope design angles by sectors as well as recommendations related to slope stability. Currently, the mine is in the second phase of a geohydrological study. This is a follow-up study of a phase 1 open pit dewatering assessment completed by independent water management consultants in 2004. A third phase of the study, which addresses pit dewatering design, and drilling of peripheral monitoring boreholes and dewatering test wells, will follow and is expected to be completed in 2010. The recommendations proposed by the consulting firms in Phases 1 and 2, are being implemented.

METAL PRODUCTION BY SEGMENTS

Set forth below are descriptions of the operations and other information relating to the operations included in each of our three segments.

PERUVIAN OPERATIONS

Our Peruvian segment operations include the Cuajone and Toquepala mine complexes and the smelting and refining plants, industrial railroad which links Ilo, Toquepala and Cuajone and port facilities.

Following is a map indicating the approximate location of, and access to, our Cuajone and Toquepala mine complexes as well as our Ilo processing facilities:

#### Cuajone

Our Cuajone operations consist of an open-pit copper mine and a concentrator located in southern Peru, 30 kilometers from the city of Moquegua and 840 kilometers from Lima. Access to the Cuajone property is by plane from Lima to Tacna (1:20 hours) and then by highway to Moquegua and Cuajone (3:30 hours). The concentrator has a milling capacity of 87,000 tons per day. Overburden removal commenced in 1970 and ore production commenced in 1976. Our Cuajone operations utilize a conventional open-pit mining method to collect copper ore for further processing in our concentrator.

The table below sets forth 2008, 2007 and 2006 production information for our Cuajone operations:

|  |  | 2008 | 2007 | 2006 |
| --- | --- | ---: | ---: | ---: |
| Mine annual operating days | (days) | 366 | 365 | 365 |
| Total material mined | (kt) | 118,054 | 116,438 | 112,410 |
| Total ore mined | (kt) | 30,217 | 28,310 | 28,299 |
| Copper grade | (%) | 0.751 | 0.755 | 0.703 |
| Molybdenum grade | (%) | 0.022 | 0.022 | 0.020 |
| Leach material mined (1) | (kt) | — | — | 41.6 |
| Leach material grade | (%) | — | — | 0.655 |
| Stripping ratio | (x) | 2.91 | 3.11 | 2.97 |
| Total material milled | (kt) | 30,250 | 28,352 | 28,228 |
| Copper recovery | (%) | 86.38 | 85.10 | 87.87 |
| Molybdenum recovery | (%) | 66.2 | 61.1 | 62.6 |
| Copper concentrate | (kt) | 759.1 | 706.7 | 666.7 |
| Molybdenum concentrate | (kt) | 8.1 | 7.0 | 6.4 |
| Copper concentrates average grade | (%) | 25.83 | 25.77 | 26.16 |
| Molybdenum concentrate average grade | (%) | 54.89 | 54.57 | 55.18 |
| Copper in concentrate | (kt) | 196.1 | 182.1 | 174.4 |
| Molybdenum in concentrate | (kt) | 4.4 | 3.8 | 3.5 |

Key: kt = thousand tons

x = ratio obtained dividing waste plus leachable material by ore mined

(1) In 2006, 41.6 kt of copper oxides were extracted from the Cuajone mine. No oxide material was mined in 2008 and 2007.

Copper and molybdenum grades are referred to as total copper grade and total molybdenum grade, respectively.

Major Cuajone mine equipment includes seven 290-ton capacity trucks, twenty 218-ton capacity trucks and seven 231-ton capacity trucks, three 73-ton capacity shovels, one 54-ton capacity shovel, one 43-ton capacity front end loader, four electric drills, seven track dozers, seven rubber track dozers, three front end loaders CAT 988 and 966 and three motor graders. We continuously improve and renovate our equipment.

The Cuajone porphyry copper deposit is located on the western slopes of Cordillera Occidental, in the southern-most Andes Mountains of Peru. The deposit is part of a mineral district that contains two additional known deposits, Toquepala and Quellaveco. The copper mineralization at Cuajone is typical of porphyry copper deposits.

The Cuajone deposit is located approximately 28 kilometers from the Toquepala deposit and is part of the Toquepala Group dated 60 to 100 million years (Upper Cretaceous to Lower Tertiary). The Cuajone lithology includes volcanic rocks from Cretaceous to Quaternary. There are 32 rock types including, pre-mineral rocks, balsaltic andesite, porphyritic rhyolite, Toquepala dolerite and intrusive rocks, including diorite, porphyritic latite, breccias and dikes. In addition, the following post-mineral rocks are present, the Huaylillas formation which appears in the south-southeast side of the deposit and has been formed by conglomerates, tuffs, traquites and agglomerates. These formations date 17 to 23 million years and are found in the Toquepala Group as discordance. The Chuntacala formation which dates 9 to 14 million years and is formed by conglomerates, flows, tuffs and agglomerates placed gradually in some cases and in discordance in others. Also Quaternary deposits are found in the rivers, creeks and hills. The mineralogy is simple with regular grade distribution and vertically funnel-shaped. Ore minerals include chalcopyrite (CuFeS2), chalcosine (Cu2S) and molybdenite (MoS2) with occasional galena, tetraedrite and enargite as non economical ore.

Mine exploration

Exploration activities during the drill campaign in 2008 are as follows:

| Studies | Meters | Holes | Notes |
| --- | ---: | ---: | --- |
| Infill Drilling | 779 | 3 | To obtain additional information to improve confidence in our block model. |
| Geotechnical Holes | 3,043 | 19 | To improve geotechnical information |
| **Total** | 3,822 | 22 |  |

Concentrator

Our Cuajone operations use state-of-the-art computer monitoring systems at the concentrator, the crushing plant and the flotation circuit in order to coordinate inflows and optimize operations. Material with a copper grade over 0.40% is loaded onto rail cars and sent to the milling circuit, where giant rotating crushers reduce the size of the rocks to approximately one-half of an inch. The ore is then sent to the ball mills, which grind it to the consistency of fine powder. The finely ground powder is agitated in a water and reagents solution and is then transported to flotation cells. Air is pumped into the cells to produce foam for floating the copper and molybdenum minerals, but splitting waste material called tailings. This copper-molybdenum bulk concentrate then is treated by inverse flotation where molybdenum is floated and copper is depressed. The copper concentrate is shipped by rail to the smelter at Ilo and the molybdenum concentrate is packaged for shipment to customers. Sulfides under 0.40% copper are considered waste.

Tailings are sent to thickeners where water is recovered. The remaining tailings are sent to the Quebrada Honda dam, our principal tailings storage facility.

Major Cuajone concentrator plant equipment includes: one primary crusher, three secondary crushers, seven tertiary crushers, ten primary ball mills, four ball mills for re-grinding rougher concentrate; one vertical mill for re-grinding rougher concentrate; thirty 100ft3 cells for rougher flotation; four 160ft3 cells for rougher flotation; five 60ft3 cells for cleaner scavenger; six 1350ft3 cells for cleaner scavenger; fourteen 300ft3 cells for cleaner scavenger; eight column cells; one Larox filter press; two thickeners for copper-molybdenum and copper concentrates; three tailings thickeners; one high-rate tailings thickener and six pumps for recycling reclaimed water.

A major mill expansion was completed in 1999 and the eleventh primary mill was put in operation in January 2008. We believe the plant’s equipment is in good physical condition and currently in operation.

#### Toquepala

Our Toquepala operations consist of an open-pit copper mine and a concentrator. We also refine copper at the SX/EW facility through a leaching process. Toquepala is located in southern Peru, 30 kilometers from Cuajone and 870 kilometers from Lima. Access is by plane from Lima to the city of Tacna (1:20 hours) and then by the Pan-American highway to Camiara (1:20 hours) and by road to Toquepala (1 hour). The concentrator has a milling capacity of 60,000 tons per day. The SX/EW facility has a production capacity of 56,000 tons per year of LME grade A copper cathodes. Overburden removal commenced in 1957 and ore production commenced in 1960. Our Toquepala operations utilize a conventional open-pit mining method to collect copper ore for further processing in our concentrator.

The table below sets forth 2008, 2007 and 2006 production information for our Toquepala operations:

|  |  | 2008 | 2007 | 2006 |
| --- | --- | ---: | ---: | ---: |
| Mine annual operating days | (days) | 366 | 365 | 365 |
| Total material mined | (kt) | 131,646 | 130,267 | 131,607 |
| Total ore mined | (kt) | 21,356 | 20,889 | 20,813 |
| Copper grade | (%) | 0.608 | 0.759 | 0.797 |
| Molybdenum grade | (%) | 0.036 | 0.046 | 0.043 |
| Leach material mined | (kt) | 74,286 | 90,521 | 42,827 |
| Leach material grade | (%) | 0.226 | 0.235 | 0.221 |
| Estimated leach recovery | (%) | 26.34 | 26.89 | 28.44 |
| SX/EW cathode production (from SPCC material) | (kt) | 38.8 | 36.7 | 35.8 |
| Third parties copper sulfate processed | (kt) | 5.6 | 15.2 | — |
| Average copper grade on copper sulfate | (%) | 23.88 | 24.16 | — |
| SX/EW cathode production from third parties | (kt) | 1.3 | 3.7 | — |
| Stripping ratio | (x) | 5.16 | 5.24 | 5.32 |
| Total material milled | (kt) | 21,328 | 20,906 | 20,828 |
| Copper recovery | (%) | 88.03 | 88.78 | 91.43 |
| Molybdenum recovery | (%) | 60.93 | 64.39 | 65.0 |
| Copper concentrate | (kt) | 419.7 | 521.9 | 557.5 |
| Molybdenum concentrate | (kt) | 8.5 | 11.4 | 10.7 |
| Copper concentrate average grade | (%) | 27.20 | 26.99 | 27.22 |
| Molybdenum concentrate average grade | (%) | 54.91 | 54.60 | 54.08 |
| Copper in concentrate | (kt) | 114.1 | 140.9 | 151.8 |
| Molybdenum in concentrate | (kt) | 4.7 | 6.2 | 5.8 |

Key: kt = thousand tons

x = ratio obtained dividing waste plus leachable material by ore mined.

Copper and molybdenum grades are referred to as total copper grade and total molybdenum grade, respectively.

Major mine equipment at Toquepala includes nineteen 290-ton capacity trucks, five 231-ton capacity trucks, eighteen 218-ton capacity trucks, one 78-ton capacity shovel, three 73-ton capacity shovels, three 20-ton capacity shovels, five electric rotary drills, one Down the Hole (DTH) drill for pre-split and one front-end loader with a capacity of 37 tons.

We continuously improve and renovate our equipment. In 2003, we started a project to install a crushing, conveying and spreading system at the Toquepala mine to improve cost containment and production efficiency. The new system improves recovery at our leaching facilities and will largely eliminate costly truck haulage in the process. The conveying system is operating and has positioned 42.5 million tons of waste material to build the ramp and has placed 28.5 million tons of leachable material.

In 2008 we installed conveyor No. 17. Present production for the last six month period of 2008 reached 7,186 tons per hour. This new system improves our cost containment and production efficiency. During 2008, we put into operation one new Komatsu 930E truck with improved haul efficiency.

The Toquepala porphyry copper deposit is located on the western slopes of Cordillera Occidental, in the southern-most Andes Mountains of Peru. The deposit is part of a mineral district that contains two additional known deposits, Cuajone and Quellaveco.

The Toquepala deposit is in the southern region of Peru, located on the western slope of the Andes mountain range, approximately 120 kilometers from the border with Chile. This region extends into Chile and is home to many of the worlds most significant known copper deposits. The deposit is in a territory with intrusive and eruptive activities of rhyolitic and andesitic rocks which are 70 million years old (Cretaceous-Tertiary) and which created a series of volcanic lava. The lava is composed of rhiolites, andesites and volcanic agglomerates with a western dip and at an altitude of 1,500 meters. These series are known as the Toquepala Group. Subsequently, different intrusive activities occurred which broke and smelted the rocks of the Toquepala Group. These intrusive activities resulted in diorites, granodiorites and dikes of porphyric dacite. Toquepala has a simple mineralogy with regular copper grade distribution. Economic ore is found as disseminated sulfurs throughout the deposit as veinlets, replenishing empty places or as small aggregates. Ore minerals include chalcopyrite (CuFeS2), chalcosine (Cu2S) and molybdenite (MoS2). A secondary enrichment zone is also found with thicknesses between 0 and 150 meters.

Mine exploration

Exploration activities during the drill campaign in 2008 are as follows:

| Studies | Meters | Holes | Notes |
| --- | ---: | ---: | --- |
| Infill and lateral body delimitation (leach and ore of Phase II) | 4,531 | 22 | To obtain additional information to improve confidence in the block model. |
| To define depth and location of potential surfaces of fault. | 1,892 | 8 | 4 drills in southwestern sector and 4 in the southeastern sector were perforated |
| Total | 6,423 | 30 |  |

Concentrator

Our Toquepala concentrator operations use state-of-the-art computer monitoring systems in order to coordinate inflows and optimize operations. Material with a copper grade over 0.40% is loaded onto rail cars and sent to the crushing circuit, where rotating crushers reduce the size of the rocks to approximately 85% less than one-half of an inch. The ore is then sent to the rod and ball mills, which grind it in a mix with water to the consistency of fine powder. The finely ground powder mixed with water is then transported to flotation cells. Air is pumped into the cells producing a froth, which carries the copper mineral to the surface but not the waste rock, or tailings. The bulk concentrate with sufficient molybdenum content is processed to recover molybdenum by inverse flotation. This final copper concentrate with a content of approximately 27.5% of copper is filtered in order to get 8.5% moisture. Concentrates are then shipped by rail to the smelter at Ilo.

Tailings are sent to thickeners where water is recovered. The remaining tailings are sent to the Quebrada Honda dam, our principal tailings storage facility.

Major concentrator plant equipment at Toquepala include one primary crusher, three secondary crushers, six tertiary crushers, eight rod mills, thirty-three ball mills, one distributed control system (DCS), one expert grinding system, forty-two flotation cells, fifteen column cells, seventy-two Agitair 1.13 m3 cells, two Larox pressure filters, five middling thickeners, two conventional tailings thickeners, three high-rate tailings thickeners, one tripper car, one track tractor and a recycled water pipe line.

SX/EW Plant

The SX/EW facility at Toquepala produces grade A LME electrowon copper cathodes of 99.999% purity from solutions obtained by leaching low-grade ore stored at the Toquepala and Cuajone mines. The leach plant commenced operations in 1995 with a design capacity of 35,629 tons per year of copper cathodes. In 1999 the capacity was expanded to 56,000 tons per year.

Copper oxides from Cuajone with a copper grade higher than 0.343%, with an acid solubility index higher than 20% and a cyanide solubility index higher than 50% are leached. In Toquepala, the leach material cutoff grade is 0.081% and therefore material with a total copper grade between 0.081% and 0.40% are leached.

Major equipment at the Cuajone SX plant includes one primary jaw crusher and one secondary cone crusher with a capacity of 390 tons per hour. In addition the plant has one agglomeration mill, one front end loader and three 109 ton capacity trucks for hauling to the leach dumps. Copper in solution produced in Cuajone is sent to Toquepala through an eight-inch pipe laid alongside the Cuajone-Toquepala railroad track.

Major equipment at the Toquepala plant includes three spray systems and five pregnant solution (PLS) ponds, each with its own pumping system to send the solution to the SX/EW plant. The plant also has three lines of SX, each with a nominal capacity of 1,068 cubic meters per hour of pregnant solution and 162 electrowinning cells.

Plant and equipment are supported by a maintenance plan and a quality management system to assure good physical condition and high availability. The SX/EW plant management quality system (including leaching operations) has been audited periodically since 2002 by an external audit company, and found to be in compliance with the requirements of the ISO 9001-2000 standard.

#### Processing Facilities - Ilo

Our Ilo smelter and refinery complex is located in the southern part of Peru, 17 kilometers north of the city of Ilo, 121 kilometers from Toquepala, 147 kilometers from Cuajone, and 1,240 kilometers from the city of Lima. Access is by plane from Lima to Tacna (1:20 hours) and then by highway to the city of Ilo (two hours). Additionally, we maintain a port facility in Ilo, from which we ship our product and receive supplies. Product shipped and supplies received are moved between Toquepala, Cuajone and Ilo on our industrial railroad.

Smelter

Our Ilo smelter provides copper for the refinery we operate as part of the same facility. Copper produced by the smelter exceeds the refinery’s capacity and the excess is sold to other refineries around the world. The nominal installed capacity of the smelter is 1,200,000 tons per year.

Copper concentrates from Toquepala and Cuajone are transported by railroad to the smelter, where they are smelted using an ISASMELT furnace, converters and anode furnaces to produce copper anodes with 99.7% copper. At the smelter, the concentrates are mixed with flux and other material and sent to the ISASMELT furnace producing a mixture of copper matte and slag which is tapped through a taphole to either of two rotary holding furnaces, where this smelted phases will be separated. Copper matte contains approximately 62% copper. Copper matte is then sent to the four converters, where the material is oxidized in two steps: (1) the iron sulfides in the matte are oxidized with oxygen enriched air and silica is added producing slag that is sent to the slag cleaning furnaces, and (2) the copper contained in the matte sulfides is then oxidized to produce blister copper, containing approximately 99.3% copper. The blister copper is refined in two anode furnaces by oxidation to remove sulfur with compressed air injected into the bath. Finally, the oxygen content of the molten copper is adjusted by reduction with injection of liquefied petroleum gas with steam into the bath. Anodes, containing approximately 99.7% copper are cast in two casting wheels.

The table below sets forth 2008, 2007 and 2006 production and sales information for our Ilo smelter plant:

|  | 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Concentrate smelted (kt) | 1,003 | 846 | 1,107 |
| Average copper recovery | 97.10% | 96.59% | 97.29% |
| Blister production (kt) | — | 9.3 | 30.8 |
| Average blister grade (%) | — | 99.369% | 99.349% |
| Anode production (kt) | 307.5 | 232.9 | 298.4 |
| Average anode grade (%) | 99.704% | 99.698% | 99.708% |
| Sulfuric acid produced (kt) | 959 | 771 | 376 |
| Blister sales (kt) | — | 9.3 | 3.0 |
| Anode sales (kt) | 10.0 | 14.1 | 13.5 |
| Average blister sales price ($/lb) | — | 3.20 | 3.10 |
| Average anode sales price ($/lb) | 1.84 | 2.87 | 3.17 |

Key: kt = thousand tons

The off gases from the smelter are treated to recover over 92% of the incoming sulfur received in the concentrates producing 98.5% sulfuric acid. The gas stream from the smelter with 11.34% SO2 is split between two plants: The No. 1 acid plant (single absorption/single contact) and the No. 2 plant (double absorption/double contact).

The smelter also has two oxygen plants. Plant No. 1, with 254 tons per day of production capacity and Plant No.2, with 1,045 tons per day of capacity.

In addition, the smelter includes a seawater intake system, two desalinization plants to provide water for the process, an electric substation and a new system of centralized controls using advanced computer technology.

Refinery

The refinery consists of a receiving and preparing anode facility, an electrolytic plant, a precious metal plant and a number of ancillary installations. The refinery is producing grade A copper cathode of 99.998% purity. The nominal capacity is 280,000 tons per year. Anodic slimes are recovered from the refining process and then sent to the precious metals facility to produce refined silver, refined gold and commercial grade selenium.

Anodes are suspended in tanks containing an aqueous solution of sulfuric acid and copper sulfate. A low voltage but high amperage electrical current is passed through the anodes, chemical solution and cathodes, in order to dissolve copper which is deposited on initially very thin starting sheets increasing its thickness to produce high grade copper cathodes containing at least 99.99% copper. During this process, silver, gold and other metals, including palladium, platinum and selenium, along with other impurities, settle on the bottom of the tank in form of anodic slime. This anodic slime is processed in a precious metal plant where silver, gold and selenium are recovered.

The table below sets forth 2008, 2007 and 2006 production and sales information for our Ilo refinery and precious metals plants:

|  | 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Cathodes produced (kt) | 248.7 | 178.4 | 273.3 |
| Average copper grade (%) | 99.986% | 99.998% | 99.998% |
| Refined silver produced (000 Kg) | 92.4 | 82.7 | 119.2 |
| Refined gold produced (kg) | 152.9 | 296.0 | 260.9 |
| Commercial grade selenium produced (t) | 44.2 | 35.4 | 49.8 |
| Average cathodes sales price ($/lb) | 2.95 | 3.20 | 3.20 |
| Average silver sales price ($/oz) | 14.2 | 12.30 | 11.46 |
| Average gold sales price ($/oz) | 833.59 | 692.29 | 589.76 |

Key: kt= thousands tons

Major equipment at the refinery includes one electrolytic plant, with 926 commercial cells, fifty-two starting sheet cells, sixteen primary liberator cells, twenty-four secondary liberator cells, an anodic slime treatment circuit (includes leaching and centrifugation), and a crude nickel sulfate production circuit.

Main equipment at the precious metals plant includes one selenium reactor, one tilting Copella furnace, twenty-four silver refining cells including an induction furnace for shots and silver ingots production and one hydrometallurgical system for gold recovery.

The refinery also has these facilities:

(1) Production Control: Provides sampling and sampling preparation for samples coming from the operating units as well as SX/EW, smelter and external services.

(2) Laboratory: Provides sample analysis services throughout the Company, including the analysis of final products like copper cathodes, electrowon cathodes, copper concentrates and oil analysis.

(3) Maintenance: Responsible for maintenance of all equipment involved in the process.

(4) Auxiliary facilities: Includes one desalinization plant to produce fresh water and a Babcock boiler to produce steam used in the refinery, one Gonella boiler and two stand-by KMH boilers.

Other facilities in Ilo are a coquina plant with a production capacity of 200,000 tons per year of seashells and a lime plant with a capacity of 80,000 tons per year. We also operate an industrial railroad to haul production and supplies between Toquepala, Cuajone and Ilo.

The industrial railroad’s main equipment includes fifteen locomotives of different types including 4000HP EMD’s SD70, 3000HP EMD’s GP40-3, 2250HP GE U23B and others. The rolling stock has approximately 490 cars of different types and capacities, including ore concentrate cars, gondolas, flat cars, dump cars, boxcars, tank cars and others. The track runs in a single 214 kilometer standard gauge line and supports a 30-ton axle load. The total length of the track system is around 257 kilometers including main yards and sidings.

The infrastructure includes 27 kilometers of track under tunnels and one concrete bridge. The industrial railroad includes a car repair shop which is responsible for maintenance and repair of the car fleet. In 2008 a long term main line upgrade program was completed and 115 and 133 pound rail replaced 90 and 105 pound rail. Also an upgrade program increasing the capacity of the ore concentrate cars from 70 to 100 net tons continues and is expected to be completed by 2010. Annual tonnage transported is approximately 5.5 million metric tons.

Following is a map indicating the approximate locations of our Mexican mines and processing facilities:

MEXICAN OPEN PIT SEGMENT

Our Mexican open-pit segment operations combines two units of Minera Mexico, Mexcobre and Mexcananea, which includes La Caridad and Cananea mine complexes and smelting and refining plants and support facilities which service both complexes.

Following is a map indicating the approximate location of, and access to, our Mexican open pit mine complexes as well as our processing facilities:

#### Cananea

Since July 2007, Cananea has been on strike. Please see Note 14 “Commitment and contingencies” to our consolidated financial statements. The Cananea mining unit operates an open-pit copper mine, a concentrator and two SX/EW plants. It is located 100 air-kilometers northwest of La Caridad and 40 kilometers south of the Arizona USA-Mexico border. It lies on the outskirts of the Cananea townsite. Cananea is connected by paved highways to the border city of Agua Prieta to the northeast, to the town of Nacozari in the southeast, and to the town of Imuris to the west. Cananea is also connected by railway to Agua Prieta and Nogales. A municipal airport is located approximately 20 kilometers to the northeast of Cananea.

The concentrator has a nominal milling capacity of 76,700 tons per day. The SX/EW facility has a cathode production capacity of 54,750 tons per year. The Cananea ore body is considered one of the world’s largest porphyry copper deposits. Cananea is the oldest continuously operated copper mine in North America, with operations dating back to 1899. High grade ore deposits in the district were mined exclusively using underground methods. The Anaconda Company acquired the property in 1917. In the early 1940s Anaconda started developing the first open pit in Cananea. In 1990, through a public auction procedure, Minera Mexico acquired 100% of the Cananea mining assets for $475 million. Cananea is currently applying conventional open-pit mining methods to extract copper ore for further processing in the concentrator. Two leach ore crushers and the corresponding belt conveying systems are used to convey the leachable material to the heaps. Likewise, run-off mine leachable ore is hauled by trucks to the leach dumps.

The following table shows 2008, 2007 and 2006 production information for Cananea:

|  |  | 2008 | 2007 | 2006 |
| --- | --- | ---: | ---: | ---: |
| Mine annual operating days (1) | (days) | 88 | 211 | 331 |
| Total material mined | (kt) | 4,820 | 74,672 | 114,595 |
| Total ore mined | (kt) | 1,271 | 12,545 | 22,896 |
| Copper grade | (%) | 0.628 | 0.630 | 0.588 |
| Leach material mined | (kt) | 2,965 | 39,198 | 59,678 |
| Leach material grade | (%) | 0.285 | 0.272 | 0.292 |
| Estimated leach recovery | (%) | 65.5 | 65.5 | 62.5 |
| SX/EW cathode production | (kt) | 9.4 | 34.6 | 52.5 |
| Stripping ratio | (x) | 2.79 | 4.95 | 4.01 |
| Total material milled | (kt) | 1,233 | 12,571 | 22,915 |
| Copper concentrate | (kt) | 24.5 | 229.8 | 386.0 |
| Copper concentrate average grade | (%) | 25.14 | 27.81 | 28.83 |
| Copper in concentrate | (kt) | 6.2 | 63.9 | 111.3 |
| Copper recovery | (%) | 79.65 | 81.22 | 82.56 |

Key: kt = thousand tons

x = ratio obtained dividing waste plus leachable material by ore mined.

The copper grade is total grade.

(1) During 2008 and 2007 there were 278 days and 154 days of illegal work stoppage, respectively. As consequence, the Company lost approximately 129 thousand tons and 55 thousand tons of copper in concentrates and 59 thousand tons and 24 thousand tons of SX/EW cathodes production in 2008 and 2007, respectively. Also while there were 47 days of strikes in 2006, only 34 production days were lost as 13 days of production were maintained with the support of management personnel.

Major Cananea mine equipment includes 44 trucks for ore hauling with individual capacities ranging from 240 to 360 tons, eight shovels with individual capacities ranging from 30 to 70 tons, and mine auxiliary equipment including, seven drillers, five front loaders, five motor graders and twenty-four tractors.

The Cananea mining district lies on the southern cordilleran orogen, which extends from southern Mexico to northwestern United States. It also falls within the Basin and Range metallogenic province. Geological and structural features in the district are representative of large, disseminated type, porphyry copper deposits. A calcareous sedimentary sequence of lower Paleozoic age, lithologically correlated with a similar section in southeastern Arizona, uncomformably overlies Precambrian granite basement. The entire section was covered by volcanic rocks of Mesozoic age and later intruded by deep seated granodiorite batholith of Tertiary age, with further quartz monzonite porphyry differentiates of Laramide age.

Mineralization in the district is extensive covering a surface area of approximately 30 km(2). An early pegmatitic stage associated with bornite-chalcopyrite-molybdenite assemblage was followed by a widespread flooding of hydrothermal solutions with quartz- pyrite-chalcopyrite. A pervasive quartz-sericite alteration is evident throughout the district’s igneous rock fabric.

An extensive and economically important zone of supergene enrichment, with disseminated and stockworks of chalcocite (Cu2S), developed below the iron oxide capping. This zone coincides with the topography and has an average thickness of 300 meters. A mixed zone of secondary and primary sulfides underlay the chalcocite blanket. The hypogene mineralization, principally chalcopyrite, (CuFeS2), extensively underlies the orebody. Molybdenite occurs throughout the deposit and the content tends to increase with depth.

The Cananea copper porphyry is considered world-class and unique. The deepest exploration results in the core of the deposit have confirmed significant increase in copper grades. Similar porphyry copper deposits usually contain lower grades at depth. The district is also unique for the occurrence of high-grade breccia pipes, occurring in clusters following the trend of the district.

Current dimensions of the mineralized ore body are 5x3 kilometers, and projects to more than 1 kilometer at depth. Considering the geological and economic potential of the Cananea porphyry copper deposit, it is expected that the operation can support a sizeable increase in copper production capacity.

Mine Exploration

Due to Cananea’s illegal work stoppage, the exploration program was not resumed during 2008. Assuming settlement of the work stoppage, the core drilling program in the areas adjacent to the deposit will be continued in 2009 in order to define areas where leach and waste will be deposited. Drilling results from past campaigns in areas adjacent to the deposit are confirming the district-wide mineralization and alteration patterns. The block model was updated with the in-fill exploratory results, both, for copper and molybdenum and we proceeded to calculate an updated estimate of the resource with new available data.

Concentrator

Cananea uses state-of-the-art computer monitoring systems at the concentrator, the crushing plant and the flotation circuit in order to coordinate inflows and optimize operations. Material with a copper grade over 0.38% is loaded onto trucks and sent to the milling circuit, where giant rotating crushers reduce the size of the ore to approximately one-half of an inch. The ore is then sent to the ball and bar mills, which grind it to the consistency of fine powder. The finely ground powder is agitated in a water and reagents solution and is then transported to flotation cells. Air is pumped into the cells producing a froth, which carries the copper mineral to the surface but not the waste rock, or tailings. Recovered copper, with the consistency of froth, is filtered and dried to produce copper concentrates with an average copper content of approximately 28%. Concentrates are then shipped by rail to the smelter at La Caridad.

The Cananea concentrator plant, with a milling capacity of 76,700 tons per day, consists of two primary crushers, four secondary crushers, ten tertiary crushers, ten primary mills, a distributed control system, five mills for re-grinding, 103 primary flotation cells, ten column cells, seventy exhaustion flotation cells, seven thickeners and three ceramic filters.

SX/EW Plant

The Cananea unit operates a leaching facility and two SX/EW plants. All copper ore with a grade lower than the mill cut-off grade of 0.38%, but higher than 0.25% copper, is delivered to the leaching dumps. A cycle of leaching and resting occurs for approximately five years to achieve a 62.5% recovery in the run-of-mine dumps and three years for the crushed leach material to achieve a 73% recovery.

The Cananea unit currently maintains 18.9 million cubic meters of pregnant leach solution in inventory with a concentration of approximately 2.0 grams of copper per liter.

Major equipment at the SX-EW plants I and II of Cananea includes two crushing systems (No. 1 and No. 2). Crushing system no. 1 has a capacity of 32,000 tons per day and includes an apron feeder, a conveyor belt feeder, seven conveyor belts system and a distributor car. Crushing system no. 2 has a capacity of 48,000 tons per day and includes one crusher, a conveyor belt feeder, three conveyor belts and a distributing car. There are four irrigation systems for the dumps and six dams for the pregnant leach solution (PLS). Plant I has three solvent extraction tanks with a nominal capacity of 16,000 liters per minute of PLS and 46 electrowinning cells. Plant I has a daily production capacity of 30 tons of copper cathodes with 99.999% purity. Plant II has five trains of solvent extraction with a nominal capacity of 55,000 liters per minute of PLS and 216 cells distributed in two bays. Plant II has a daily production capacity of 120 tons of copper cathodes with 99.9% purity.

We intend to increase our Cananea unit’s production of copper cathodes with a new SX/EW plant, (SXEW III) with an annual capacity of 33,000 tons. The plant would produce copper cathodes of ASTM grade 1 or LME grade A. The project includes the installation of storage for deliverables required for operation of the plant and the installation of an emergency power plant and a fire protection system. Due to the ongoing strike at Cananea, this project has been temporarily put on hold until we satisfactorily resolve the labor issue.

#### La Caridad

The La Caridad complex includes an open-pit mine, concentrator, smelter, copper refinery, precious metals refinery, rod plant, SX/EW plant, lime plant and two sulfuric acid plants.

La Caridad mine and mill are located about 23 kilometers southeast of the town of Nacozari de Garcia in northeastern Sonora. Nacozari is about 264 kilometers northeast of the Sonora state capital of Hermosillo and 121 kilometers south of the US-Mexico border. Nacozari is connected by paved highway with Hermosillo and Agua Prieta and by rail with the international port of Guaymas, and the Mexican and United States rail systems. An airstrip with a reported runway length of 2,500 meters is located 36 kilometers north of Nacozari, less than one kilometer away from the La Caridad copper smelter and refinery. The smelter and the sulfuric acid plants, as well as the refineries and rod plant, are located approximately 24 kilometers from the mine. Access is by paved highway and by railroad.

The concentrator began operations in 1979, the molybdenum plant was added in 1982, the smelter in 1986, the first sulfuric acid plant in 1988, the SX/EW plant in 1995, the second sulfuric acid plant in 1997, the copper refinery in 1997, the rod plant in 1998, and the precious metals refinery in 1999.

The table below sets forth 2008, 2007 and 2006 production information for La Caridad:

|  |  | 2008 | 2007 | 2006 (1) |
| --- | --- | ---: | ---: | ---: |
| Mine annual operating days | (days) | 366 | 365 | 229 |
| Total material mined | (kt) | 85,739 | 80,819 | 46,606 |
| Total ore mined | (kt) | 31,779 | 30,970 | 16,872 |
| Copper grade | (%) | 0.380 | 0.408 | 0.449 |
| Molybdenum grade | (%) | 0.0380 | 0.0377 | 0.0348 |
| Leach material mined | (kt) | 38,053 | 30,017 | 19,109 |
| Leach material grade | (%) | 0.235 | 0.252 | 0.252 |
| Estimated leach recovery | (%) | 50.84 | 34.44 | 34.39 |
| SX/EW cathode production | (kt) | 22.0 | 22.7 | 11.2 |
| Total material milled | (kt) | 31,587 | 31,129 | 16,637 |
| Stripping ratio | (x) | 1.70 | 1.61 | 1.76 |
| Copper concentrate | (kt) | 421.5 | 423.0 | 227.8 |
| Molybdenum concentrate | (kt) | 13.7 | 11.2 | 4.5 |
| Copper concentrate average grade | (%) | 23.00 | 24.18 | 25.49 |
| Molybdenum concentrate average grade | (%) | 53.02 | 54.83 | 55.92 |
| Copper in concentrate | (kt) | 96.9 | 102.3 | 58.1 |
| Molybdenum in concentrate | (kt) | 7.3 | 6.2 | 2.5 |
| Copper recovery | (%) | 80.70 | 80.43 | 77.69 |
| Molybdenum recovery | (%) | 60.59 | 52.54 | 43.20 |

Key: kt = thousand tons

x = ratio obtained dividing waste plus leachable material by ore mined

The copper and molybdenum grade are total grade. The molybdenum grade value corresponds to molybdenum disulfide (molybdenite); molybdenum recovery is presently about 60.59%.

(1) In 2006 there were 125 days of strikes.

Major mine equipment includes twenty-seven trucks for ore hauling with capacity of 240 tons, six shovels with a capacity of 43 cubic yard. Loading and auxiliary equipment include six drillers, five front loaders, three motorgraders and twenty tractors.

The La Caridad deposit is a typical porphyry copper deposit as seen also in the southwestern basin of United States. The La Caridad mine uses a conventional open-pit mining method. The ore body is at the top of a mountain, which gives La Caridad the advantage of a relative low waste-stripping ratio, natural pit drainage and relative short haul for both ore and waste. The mining method involves drilling, blasting, loading and haulage of ore and waste to the primary crushers and the waste dumps, respectively.

La Caridad deposit is located in northeastern Sonora, Mexico. The deposit is situated near the crest of the Sierra Juriquipa, about 23 kilometers southeast of the town of

Nacozari, Sonora, Mexico. The Sierra Juriquipa rises to elevations of around 2,000 meters in the vicinity of La Caridad and is one of the many north-trending mountain ranges in Sonora that form a southern extension of the basin and range province.

The La Caridad porphyry copper deposit occurs exclusively in felsic to intermediate intrusive igneous rocks and associated breccias. Host rocks include diorite and granodiorite. These rocks are intruded by a quartz monzonite porphyry stock and by numerous breccia masses, which contain fragments of all the older rock types.

Supergene enrichment, consisting of complete to partial chalcosite (Cu2S) replacement of chalcopyrite (CuFeS2). The zone of supergene enrichment occurs as a flat and tabular blanket with an average diameter of 1,700 meters and thickness generally between 0 and 90 meters.

Economic ore is found as disseminated sulfurs within the central part of the deposit. Sulfide-filled breccias cavities are most abundant in the intrusive breccia. This breccia-cavity mineralization occurs as sulfide aggregates which have crystallized in the spaces separating breccia clasts. Near the margins of the deposit, mineralization occurs almost exclusively in veinlets. Ore minerals include chalcopyrite (CuFeS2), chalcosite (Cu2S) and molybdenite (MoS2).

Mine Exploration

We have been mining the La Caridad ore body for over 25 years. The extent of the model area is approximately 6,000 meters by 4,000 meters with elevation ranging from 750 to 1,800 meters.

Fifteen drilling campaigns have been conducted on the property since 1968. These campaigns drilled a total of 3,315 drill holes: 1,152 were diamond drill hole and 2,163 were reverse circulation. We have also drilled some hammer and percussion drill holes. A total of 606,623 meters have been drilled through December 2008.

In 2008, La Caridad finished a large exploration program of 50,000 meters. The target was to get down to the 900 level in order to reduce the drilling space and to define the copper and molybdenum mineralization continuity and also carry out metallurgical testing for the flotation and leaching processes.

Concentrator

La Caridad uses state-of-the-art computer monitoring systems at the concentrator, the crushing plant and the flotation circuit in order to coordinate inflows and optimize operations. The concentrator has a current capacity of 90,000 tons of ore per day.

Ore extracted from the mine with a copper grade over 0.30% is sent to the concentrator and is processed into copper concentrates and molybdenum concentrates. The copper concentrates are sent to the smelter and the molybdenum concentrate is exported. The molybdenum recovery plant has a capacity of 2,000 tons per day of copper-molybdenum concentrates. The lime plant has a capacity of 340 tons of finished product per day.

La Caridad concentrator plant has a milling capacity of 90,000 tons per day and consists of two primary crushers, six secondary crushers, twelve tertiary crushers, twelve ball mills, a master milling control system, 100 primary flotation cells, four re-grinding mills, 96 cleaning flotation cells, twelve thickeners and six drum filters.

SX/EW Plant

Approximately 547.5 million tons of leaching ore with an average grade of approximately

0.26% copper have been extracted from the La Caridad open-pit mine and deposited in leaching dumps from May 1995 to December 31, 2008. All copper ore with a grade lower than the mill cut-off grade 0.30%, but higher than 0.15% copper, is delivered to the leaching dumps. In 1995, we completed the construction of a SX/EW facility at La Caridad that has allowed processing of this ore and certain leach ore reserves that were not mined and has resulted in a reduction in our copper production costs. The SX/EW facility has an annual capacity of 21,900 tons of copper cathodes.

The La Caridad SX-EW plant has nine irrigation systems for the dumps and two PLS dams, a container of heads that permits the combination of the solutions of both dams and feeds the SX/EW plant with a more homogenous concentration. The plant has three trains of solvent extraction with a nominal capacity of 2,070 cubic meters per hour and 94 electrowinning cells distributed in one single electrolytic bay. The plant has a daily production capacity of 62 tons of copper cathodes with 99.999% purity.

#### Processing Facilities — La Caridad

Our La Caridad complex includes a smelter, an electrolytic copper refinery, a precious metal refinery and a copper rod plant. The distance between this complex and the La Caridad mine is approximately 24 kilometers.

Smelter

Copper concentrates from Cananea and La Caridad are transported by rail and truck, respectively, to the La Caridad smelter where they are processed and cast into copper anodes of 99.2% purity. Sulfur dioxide off-gases collected from the flash furnace, Teniente converter and conventional converters are processed into sulfuric acid, at two sulfuric acid plants. Approximately 2% to 3% of this acid is used by our SX-EW plants and the balance is sold to third parties.

Almost all of the anodes produced in the smelter are sent to the La Caridad copper refinery. The actual installed capacity of the smelter is 1,000,000 tons per year, a capacity that is sufficient to treat all the concentrates of the La Caridad and Cananea mining complexes. The smelter includes a flash type concentrates drier, a steam drier, a flash furnace, one El Teniente modified converted furnace, two electric slag-cleaning furnaces, three Pierce-Smith converters, three rafinnate furnaces and two casting wheels. The anode production capacity is 300,000 tons per year.

Refinery

La Caridad includes an electrolytic copper refinery that uses permanent cathode technology. The installed capacity of the refinery is 300,000 tons per year. The refinery consists of an anode plant with a preparation area, an electrolytic plant with an electrolytic cell house with 1,115 cells and 32 liberator cells, two cathode stripping machines, an anode washing machine, a slime treatment plant and a number of ancillary installations. The refinery is producing grade A copper cathode of 99.99% purity. Anodic slimes are recovered from the refining process and sent to the slimes treatment plant where additional copper is extracted. The slimes are then filtered, packed and shipped to the La Caridad precious metals refinery to produce silver and gold.

The operations of the precious metal refinery are divided into two stages: (i) the antimony is eliminated from the slime, and (ii) the slime is dried in a steam dryer. After this the dried slime is smelted and a gold and silver alloy is obtained, which is known as dore. The precious metal refinery plant has a hydrometallurgical stage and a pyrometallurgical stage, besides a steam dryer, dore casting system, Kaldo furnace, 20 electrolytic cells in the silver refinery, one induction furnace for fine silver, one silver ingot casting system, two reactors for obtaining fine gold. The process ends with the refining of the gold and silver alloy.

Copper Rod Plant

A rod plant at the La Caridad complex was completed in 1998 and reached its full annual operating capacity of 150,000 tons in 1999. The plant is producing eight millimeter copper rods with a purity of 99.99%. The rod plant includes a vertical furnace, one retention furnace, one molding machine, one laminating machine, one coiling machine and one coil compacter.

Other facilities include a lime plant with a capacity of 132,000 tons per year; two sulfuric acid plants, one with a capacity of 2,625 tons per day and the second with a capacity of 2,135 tons per day; three oxygen plants, each with a production capacity of 275 tons per day; and two power turbo generators, one of them uses residual heat from the flash furnace, the first with a 11.5 megawatt capacity and the second with a 25 megawatt capacity.

The table below sets forth 2008, 2007 and 2006 production information for the La Caridad processing facilities:

| Smelter |  | 2008 | 2007 | 2006 |
| --- | --- | ---: | ---: | ---: |
| Total copper concentrate smelted | (kt) | 574.6 | 684.8 | 724.0 |
| Anode copper production | (kt) | 173.2 | 204.4 | 242.4 |
| Average copper content in anode | (%) | 99.25 | 99.19 | 99.28 |
| Average smelter recovery | (%) | 97.50 | 97.55 | 97.44 |
| Sulfuric acid production | (kt) | 578.2 | 674.3 | 670.5 |
| **Refinery** |  |  |  |  |
| Refined cathode production | (kt) | 140.3 | 173.3 | 200.4 |
| Refined silver production | (000 kg) | 136.4 | 110.1 | 131.0 |
| Refined gold production | (Kg) | 666 | 544 | 722 |
| **Rod Plant** |  |  |  |  |
| Copper rod production | (kt) | 76.3 | 96.6 | 96.6 |

| Sales data: |  | 2008 | 2007 | 2006 |
| --- | --- | ---: | ---: | ---: |
| Average realized price copper rod | ($per lb) | 3.24 | 3.24 | 3.11 |
| Average premium copper rod | ($per lb) | 0.11 | 0.07 | 0.08 |
| Average realized price gold | ($per ounce) | 858.80 | 660.57 | 596.83 |
| Average realized price silver | ($per ounce) | 13.84 | 13.04 | 11.58 |
| Average realized price sulfuric acid | ($per ton) | 145.99 | 47.66 | 41.86 |

Key: kt = thousand tons

MEXICAN IMMSA UNIT

Our IMMSA unit (underground mining poly-metallic division) operates five underground mining complexes situated in central and northern Mexico and produces zinc, lead, copper, silver, gold and has a coal mine. These complexes include industrial processing facilities for zinc, lead, copper and silver. All of IMMSA’s mining facilities employ exploitation systems and conventional equipment. We believe that all the plants and equipment are in satisfactory operating condition. IMMSA’s principal mining facilities include Charcas, Santa Barbara, San Martin, Santa Eulalia and Taxco.

The table below sets forth 2008, 2007 and 2006 production information for our Mexican IMMSA unit:

|  |  | 2008 | 2007 | 2006 |
| --- | --- | ---: | ---: | ---: |
| Average annual operating days(\*) |  | 315 | 290 | 323 |
| Total material mined and milled | (kt) | 2,923 | 3,863 | 4,407 |
| Zinc average ore grade | (%) | 4.14 | 3.62 | 3.56 |
| Zinc concentrate | (kt) | 194.0 | 222.8 | 252.1 |
| Zinc concentrate average grade | (%) | 55.10 | 54.32 | 54.17 |
| Zinc average recovery | (%) | 88.37 | 86.47 | 87.06 |
| Lead average ore grade | (%) | 0.89 | 0.65 | 0.57 |
| Lead concentrate | (kt) | 38.3 | 39.1 | 38.9 |
| Lead concentrate average grade | (%) | 53.36 | 49.53 | 49.06 |
| Lead average recovery | (%) | 78.38 | 77.09 | 76.32 |
| Copper average ore grade | (%) | 0.37 | 0.39 | 0.41 |
| Copper concentrate | (kt) | 18.3 | 36.9 | 46.4 |
| Copper concentrate average grade | (%) | 29.57 | 24.51 | 22.72 |
| Copper average recovery | (%) | 50.42 | 59.52 | 59.09 |

kt = thousand tons

(\*) Weighted average annual operating days based on total material mined and milled in the five mines: Charcas, San Martin, Taxco, Santa Barbara, and Santa Eulalia.

Charcas

The Charcas mining complex is located 111 kilometers north of the city of San Luis Potosi in the State of San Luis Potosi, Mexico. Charcas is connected to the state capital by a paved highway of 130 kilometers. 14 kilometers from the southeast of the Charcas complex is the “Los Charcos” railroad station which connects with the Mexico-Laredo railway. Also, a paved road connects Charcas to the city of Matehuala via a federal highway and begins at the northeast of the Charcas townsite. The complex includes three underground mines (San Bartolo, Rey-Reina and La Aurora) and one flotation plant that produces zinc, lead and copper concentrates, with significant amounts of silver. The Charcas mining district was discovered in 1573 and operations in the 20th century began in 1911. The Charcas mine is characterized by low operating costs and good quality ores and is situated near the zinc refinery. The Charcas mine is now Mexico’s largest producer of zinc.

The Charcas complex’s equipment includes sixteen jumbo drilling tools, twenty-one scoop trams for mucking and loading, seven trucks and three locomotives for internal ore haulage and three hoists. In addition, the mill has one primary crusher, one secondary crusher and two tertiary crushers, four mills and three flotation circuits.

The Charcas mining district occupies the east-central part of the Mexican Central Mesa and is part of the Sierra Madre metallogenic province. Geological history starts in the Superior Triasic, where sandy clay sediments were deposited argilloarenaceous. Due to emersion in the beginning of the Jurassic Superior, the sediments suffered intense erosion, settling on continental sediments. This sequence was affected by tectonic effort, which folded and failed on this rock package. Later the positioning of intrusive rocks originated fractures, which gave way to positioning of mineral deposits. The site’s paragenesis suggests two stages of mineralization. First minerals are rich in silver, lead and zinc, with abundant calcite and small quantities of quartz chalcopyrite. Second, there is a link of copper and silver, where the characteristic minerals are chalcopyrite, lead ore with silver content, pyrite and scarce sphalerite. Economic ore is found as replacement sulfurs in carbonates host rock. The ore mineralogy is comprised predominantly of calcopyrite (CuFeS2), sphalerite (ZnS), galena (PbS) and silver minerals as diaphorite (Pb2Ag3Sb3S8).

Mine exploration

In Charcas, 16,739 meters of diamond drilling were executed from underground stations and 39,043 meters from surface. With this drilling, 1,683,724 tons were added to the reserve base in 2008.

The table below sets forth 2008, 2007 and 2006 production information for our Charcas mine:

|  |  | 2008 | 2007 | 2006 |
| --- | --- | ---: | ---: | ---: |
| Annual operating days | (days) | 325 | 324 | 323 |
| Total material mined and milled | (kt) | 1,169 | 1,259 | 1,343 |
| Zinc average ore grade | (%) | 5.70 | 5.46 | 5.37 |
| Zinc concentrate | (kt) | 109.5 | 112.4 | 117.8 |
| Zinc concentrate average grade | (%) | 56.94 | 56.91 | 56.90 |
| Zinc average recovery | (%) | 93.53 | 93.14 | 92.97 |
| Lead average ore grade | (%) | 0.53 | 0.32 | 0.20 |
| Lead concentrate | (kt) | 9.8 | 7.6 | 4.6 |
| Lead concentrate average grade | (%) | 45.40 | 33.70 | 27.14 |
| Lead average recovery | (%) | 71.26 | 63.78 | 45.86 |
| Copper average ore grade | (%) | 0.23 | 0.22 | 0.21 |
| Copper concentrate | (kt) | 3.6 | 4.2 | 4.2 |
| Copper concentrate average grade | (%) | 28.54 | 26.17 | 26.08 |
| Copper average recovery | (%) | 37.83 | 40.07 | 38.16 |

kt = thousand tons

The Charcas mine uses the hydraulic cut-and-fill method and the room-and-pillar mining method with descending benches. The broken ore is hauled to the underground crusher station. The crushed ore is then hoisted to the surface for processing in the flotation plant to produce lead, zinc and copper concentrates. The capacity of the flotation plant is 4,000 tons of ore per day. The lead concentrate produced at Charcas is treated at a third party refinery in Mexico. The zinc and copper concentrates are treated at our San Luis Potosi zinc refinery and copper smelter.

Santa Barbara

The Santa Barbara mining complex is located approximately 26 kilometers southwest of the city of Hidalgo del Parral in southern Chihuahua, Mexico. The area can be reached via paved road from Hidalgo del Parral, a city on a federal highway. Chihuahua, the state capital is located 250 kilometers north of the Santa Barbara complex. Additionally, El Paso on the Texas border is located 600 kilometers north of Santa Barbara. Santa Barbara includes three main underground mines (San Diego, Segovedad and Tecolotes) and a flotation plant and produces lead, copper and zinc concentrates, with significant amounts of silver. Gold-bearing veins were discovered in the Santa Barbara district as early as 1536. Mining activities in the 20th century began in 1913.

The mining operations at Santa Barbara are more diverse and complex than at any of the other mines in our Mexican operations, with veins that aggregate approximately 21 kilometers in length. Each of the three underground mines has several shafts and crushers. Due to the variable characteristics of the ore bodies, four types of mining methods are used: shrinkage stoping, long-hole drilled open stoping, cut-and-fill stoping and horizontal bench stoping. The ore, once crushed, is processed in the flotation plant to produce concentrates. The flotation plant has a capacity of 5,700 tons of ore per day. The lead concentrate produced is treated at a third party refinery in Mexico. The copper concentrates are treated at our San Luis Potosi copper smelter, and the zinc concentrates are either treated at the San Luis Potosi zinc refinery or exported.

The major mine equipment at Santa Barbara includes eighteen jumbo drilling tools, one Simba drilling tools, thirty-six scoop trams, thirteen trucks and eleven locomotives for internal ore haulage, seven trucks for external haulage and six hoists. For treating the ore, there are six primary jaw crushers, one secondary crusher and two tertiary crushers, three mills and three flotation circuits. The concentrator plant has a milling capacity of 6,000 tons of ore per day.

The majority of production from the district comes from quartz veins within faults and fractures. The north to northwestern trending veins is up to several kilometers long, dips steeply to the west and is 0.5 to 30 meters wide. Ore shoots up to several hundred meters in length, extends to at least 900 meters below the surface and is separated from other ore by 0.5 to 1 meter of barren quartz vein. Metal zoning occurs in some veins, with zinc and lead content generally decreasing with depth and copper increasing with depth. Three main systems of veins exist inside the district, represented by the veins Coyote, Segovedad Novedad and Coyote Seca Palmar. In addition to the main veins, there are many smaller sub-parallel to branching ore bearing veins. Economic ore minerals include sphalerite (ZnS), marmatite (ZnFeS), galena (PbS), chalcopyrite (CuFeS2) and tetrahedrite (CuFe12Sb4S13). Gangue minerals include quartz (SiO2), pyrite (FeS2), magnetite (Fe2O4), pirrotite (Fe2+S), arsenopyrite (FeAsS) and fluorite (CaF2).

The Santa Barbara district has mineralization to indicate that it will continue to be a significant producer of lead, copper and zinc for decades. The full potential of the district has not yet been defined, but the area seems to justify an increase in exploration.

Mine Exploration:

In Santa Barbara, 12,705 meters were drilled from underground stations and 8,519 meters from the surface in 2008. With this drilling 511,603 tons were added to the reserve base in 2008.

The table below sets forth 2008, 2007 and 2006 production information for our Santa Barbara mines:

|  |  | 2008 | 2007 | 2006 |
| --- | --- | ---: | ---: | ---: |
| Annual operating days | (days) | 327 | 326 | 326 |
| Total material mined and milled | (kt) | 1,461 | 1,450 | 1,484 |
| Zinc average ore grade | (%) | 2.37 | 2.18 | 2.11 |
| Zinc concentrate | (kt) | 55.9 | 48.6 | 48.6 |
| Zinc concentrate average grade | (%) | 53.68 | 53.94 | 54.38 |
| Zinc average recovery | (%) | 86.69 | 82.82 | 84.50 |
| Lead average ore grade | (%) | 0.90 | 0.85 | 0.86 |
| Lead concentrate | (kt) | 19.4 | 19.5 | 20.1 |
| Lead concentrate average grade | (%) | 54.28 | 52.40 | 54.11 |
| Lead average recovery | (%) | 80.20 | 83.02 | 85.20 |
| Copper average ore grade | (%) | 0.53 | 0.53 | 0.52 |
| Copper concentrate | (kt) | 14.8 | 15.1 | 14.3 |
| Copper concentrate average grade | (%) | 29.82 | 29.81 | 30.20 |
| Copper average recovery | (%) | 56.87 | 58.49 | 56.10 |

kt = thousand tons

San Martin

The San Martin mining complex is located in the municipality of Sombrerete in the western part of the state of Zacatecas, Mexico, approximately 101 kilometers southeast of the city of Durango and nine kilometers east of the Durango State boundary. Access to the property is via a federal highway between the cities of Durango and Zacatecas. A paved six kilometer road connects the mine and town of San Martin with the highway. The city of Sombrerete is about 16 kilometers east of the property. The complex includes an underground mine and a flotation plant and produces lead, copper and zinc concentrates, with significant amounts of silver. The mining district in which the San Martin mine is located was discovered in 1555. Mining operations in the 20th century began in 1949. San Martin lies in the Mesa Central between the Sierra Madre Occidental and the Sierra Madre Oriental.

The horizontal cut-and-fill mining method is used at the San Martin mine. The broken ore is hauled to the underground crusher station. The ore is then brought to the surface and fed to the flotation plant to produce concentrates. The flotation plant has a total capacity of 4,400 tons of ore per day. The lead concentrate is treated at a third party refinery in Mexico. The copper concentrate is treated at our San Luis Potosi copper smelter and zinc concentrate is either treated at the San Luis Potosi zinc refinery or exported.

The major mine equipment at San Martin includes eight jumbo drilling tools, thirteen scoop trams, nine trucks and three hoists. For treating the ore, there are two primary jaw crushers, two secondary crushers and one tertiary crusher, two mills and three flotation circuits. The concentrator plant has a mill capacity of 4,400 tons of ore per day.

San Martin lies in the Central Mesa between two major geologic provinces, Sierra Madre Occidental and Sierra Madre Oriental. The main sedimentary rock-formation in the San Martin district is the Upper Cretaceous Age Cuesta del Cura limestone. The formation is an interlayered sequence of shallow marine limestone and black chert, and it is overlain by Indura formation which outcrops at the foot of the topographic heights of the Cuesta del Cura formation. It consists mainly of alternating shales and fine-grained clayed limestones in ten to thirty centimeter thick layers.

The district’s most important mineral deposits are replacement veins and bodies generated in the skarn by Cerro de la Gloria granodiorite intrusion. An extensive zone of skarn west of the intrusive hosts, the San Marcial, Ibarra and Gallo-Gallina main ore veins, which appear at the surface for distances of up to 1,000 meters, with thicknesses of 40 centimeters to four meters, paralleling the intrusive contact. In the central part of the deposit there is a horizontal zoning with respect to the contact of the intrusive with high values of silver and copper. In the top of the deposit there is mostly lead and zinc. In the northeast/east over concentric structures to the intrusive there is an increment of lead, zinc and silver in the skarn. Economic ore is found as replacement ore bodies between the main veins as massive and disseminated sulfides with widths from eight meters up to 200 meters. These bodies consist mostly of chalcopyrite (CuFeS2), sphalerite (ZnS), galena (PbS), bornite (Cu5FeS4), tetrahedrite (CuFe12Sb4S13), native silver (Ag), pyrrite (FeS), arsenopyrite (FeAsS) and stibnite (Sb2S3). Molybdenum and tungsten are found in little portions in the skarn near the contact associated with the calcite.

Mine Exploration

There was no mine exploration drilling in 2008 because the San Martin mine was on strike for the whole year.

The table below sets forth 2008, 2007 and 2006 production information for our San Martin mines:

|  |  | 2008 | 2007 | 2006 |
| --- | --- | ---: | ---: | ---: |
| Annual operating days | (days) (1) | — | 171 | 239 |
| Total material mined and milled | (kt) | — | 625 | 926 |
| Zinc average ore grade | (%) | — | 1.76 | 2.17 |
| Zinc concentrate | (kt) | — | 16.0 | 29.9 |
| Zinc concentrate average grade | (%) | — | 51.68 | 51.45 |
| Zinc average recovery | (%) | — | 75.16 | 76.67 |
| Lead average ore grade | (%) | — | 0.18 | 0.21 |
| Lead concentrate | (kt) | — | 1.1 | 2.6 |
| Lead concentrate average grade | (%) | — | 32.26 | 34.02 |
| Lead average recovery | (%) | — | 32.96 | 44.65 |
| Copper average ore grade | (%) | — | 0.69 | 0.71 |
| Copper concentrate | (kt) | — | 17.6 | 27.9 |
| Copper concentrate average grade | (%) | — | 19.59 | 18.38 |
| Copper average recovery | (%) | — | 80.21 | 77.89 |

kt = thousand tons

(1) There were 366, 136 and 77 days of strikes in 2008, 2007 and 2006, respectively. As a consequence San Martin lost 10,292 tons and 6,078 tons of zinc in concentrates, 501 tons and 477 tons of lead in concentrates and 4,375 tons and 2,237 tons of copper in concentrates in 2008 and 2007, respectively.

Santa Eulalia

The mining district of Santa Eulalia is located in the central part of the state of Chihuahua, Mexico, approximately 26 kilometers east of the city of Chihuahua. This district covers approximately 48 square kilometers and is divided into three fields: east field, central field and west field. The west field and the east field, in which the principal mines of the complex are found, are separated by six kilometers. The Buena Tierra mine is located in the west field and the San Antonio mine is located in the east field. The mining district was discovered in 1590, although exploitation did not formally begin until 1870.

The district of Santa Eulalia is connected to the city of Chihuahua by a paved road

(highway no. 45), at a distance of ten kilometers there is a paved detour to Aquiles Serdan and Francisco Portillo (also known as Santo Domingo) where the Company’s offices and the Buena Tierra mine are located. Access to the Buena Tierra mine and San Antonio mine is through an 11 kilometer unpaved road.

The Santa Eulalia mine suspended operations from October 2000 to December 2004, during which time rehabilitation work was completed at the San Antonio shaft and pipes were installed to expand the pumping capacity to 10,500 gallons per minute. In January 2005, operations restarted at the Santa Eulalia mine, with a production plan for 230,900 tons. The flotation plant, at which lead and zinc concentrates are produced, has a capacity of 1,500 tons of ore per day. The lead concentrate is treated at a third party refinery, and the zinc concentrate is treated at our San Luis Potosi zinc refinery.

Major mine equipment at the Santa Eulalia mine include five Jumbo drilling tools, nine scoop trams for mucking and loading, two trucks and two hoists. For treating the ore, there are two primary crushers, one secondary crusher and one tertiary crusher, two mill crushers, one mill and two flotation circuits. The concentrator plant has a milling capacity of 1,450 tons of ore per day.

Geology

Santa Eulalia is the largest of a number of similar districts that lie along the intersection of the Laramide-aged Mexican Thrust Belt and the Tertiary volcanic plateau of the Sierra Madre Occidental. Deposits throughout the belt occur in a thick Jurassic-Cretaceous carbonate succession that overlies Paleozoic or older crust.

The main sedimentary rock in the Santa Eulalia district is the Lower Cretaceous Limestone. These are irregularly covered by volcanic sedimentary conglomerates that are overlaid by volcanic rocks of the tertiary and alluvial material of the Quaternary Age.

In the Santa Eulalia mining district a thickness of 500 meters of sedimentary rocks is known to exist which consists of the following formations: 1) Formation Lagrima (limestone fossils); 2) Formation Glen Rose (limestone blue and at its base a black limestone appears); and 3) Formation Cuchillo (limestone with shale). Dikes and sills of riolite composition and sills of diabase also exist.

In the district there are several systems of fractures and faults associated with the emplacement of felsitic and maphic intrusives. The most important controller of the ore bodies are the north-south fractures.

The mineralization corresponds in its majority to ore skarns — silicoaluminates of calcium, iron and manganese with variable quantities of lead, zinc, copper and iron sulfides, located in the planes of crossings in the interstices of the silicates.

Economic ore is found as replacement in the Limestone Glen Rose in the contact with dikes and sills and replacements in diabase sills. The mineralogy is comprised predominantly of sphalerite (ZnS), galena (PbS) and small quantities of pyrargyrite (Ag3SbS3).

Mine Exploration

At Santa Eulalia, in 2008, 8,520 meters were drilled from underground stations and 9,649 meters from the surface. With this drilling an additional mineralized material of 502,755 tons was developed and 15,375 tons were added to the reserve base in 2008.

The table below sets forth 2008, 2007 and 2006 production information for our Santa Eulalia mine:

|  |  | 2008 | 2007 | 2006 |
| --- | --- | ---: | ---: | ---: |
| Annual operating days | (days) | 326 | 326 | 326 |
| Total material mined and milled | (kt) | 293 | 281 | 244 |
| Zinc average ore grade | (%) | 6.73 | 6.60 | 6.95 |
| Zinc concentrate | (kt) | 28.7 | 28.1 | 26.1 |
| Zinc concentrate average grade | (%) | 50.87 | 50.23 | 51.19 |
| Zinc average recovery | (%) | 73.87 | 76.14 | 78.75 |
| Lead average ore grade | (%) | 2.29 | 2.24 | 2.04 |
| Lead concentrate | (kt) | 9.1 | 8.5 | 7.1 |
| Lead concentrate average grade | (%) | 59.94 | 61.10 | 56.17 |
| Lead average recovery | (%) | 81.41 | 82.35 | 80.13 |

kt = thousand tons

Taxco

The Taxco mining complex is located on the outskirts of the city of Taxco in the northern part of Guerrero State, Mexico, approximately 71 kilometers from the city of Cuernavaca, Morelos, where access through the highway to the complex is possible. The complex includes several underground mines (San Antonio, Guerrero and Remedios) and a flotation plant and produces lead and zinc concentrates, with some amounts of gold and silver. The mining district in which the Taxco mines are located was discovered in 1519. Mining activities in the 20th century commenced in 1918. The Taxco district lies in the northern part of the Balsas-Mexcala basin adjacent to the Paleozoic Taxco-Zitacuaro Massif.

IMMSA employs shrinkage, cut-and-fill and the room and pillar mining methods at the Taxco mines. The flotation plant has a capacity of 2,000 tons of ore per day. The lead concentrate is treated at a third party refinery in Mexico. The zinc concentrate is either treated at the San Luis Potosi zinc refinery or exported.

The major mine equipment at the Taxco complex include four Jumbo drilling tools, ten scoop trams for mucking and loading, five trucks and three locomotives for internal ore haulage and three hoists. For treating the ore, there are two primary crushers, one secondary crusher and two tertiary crushers, three mills and two flotation circuits. The concentrator plant has a milling capacity of 2,000 tons of ore per day.

The Taxco district is stratigraphically formed of rocks from Jurassic to recent periods, which are described below, with emphasis on the mineralization control characteristics. The Taxco schist is composed of a series of schists and fylites, most likely from a volcanic-sedimentary sequence of tufa and limonites. They represent a sequence of metamorphological arch and its age has been defined as Jurassic Medium. The Morelos formation from the Upper Cretaceous age (Apian-Turonian) lies on a discordant form over Taxco schist and its contact is several times marked by a clay zone (mylonites) and breccia, which implies a shifting of this unit over the schist (packs). The Mezcala formation is constituted by a sequence of shale and sandstone with some inter-stratified layers of limestone. Its base is calcarean. Its top tends to be rich in clay with thin limestone layers. The Balsas group is constituted by conglomerates and is sandy on its base, rests in discordance form on an erosioned surface from the Mexcala formation. The Tilzapotla Ryolite is the newest rock, which emerged in the district before the alluvial deposit. It is formed of flux, breccia, tuffaceous, ignimbrites and vitrophyrre of ryolite composition.

There are four types of ore deposits found in Taxco district. In order of importance they are as follows: fissure-filling veins, replacement veins, blanket-like replacement bodies (so called “mantos”), stock works and brecciate chimneys. The three first ones are intimately related and they were formed in the same era, although in different stages.

The veins reach up to two kilometers in length with a variable potency of thirty centimeters up to eight meters, which is the case of copper veins at the mines of Guerrero, Hueyapa and Palo Amarillo at the San Antonio mine; the Remedios mine has among other veins, El Muerto and El Cristo one kilometer long and five meters in average potency.

Economic ore is found in the deposit in veins. Ore mineral include argentiferous galena (PbS), sphalerite (ZnS), pyrargyrite (Ag3SbS3), and other sulfosalts, and replacement “mantos.” The most mineralized zones are in the vicinity of the veins with the limestone. The mineralization is more intensive in the base of the limestone and consists of sphalerite (ZnS), galena (PbS), pyrite (FeS) and magnetite (FeOFe2O3).

Mine Exploration

There was no mine exploration drilling in 2008 because the Taxco mine was on strike for the whole year.

The table below sets forth 2008, 2007 and 2006 production information for our Taxco mine:

|  |  | 2008 | 2007 | 2006 |
| --- | --- | ---: | ---: | ---: |
| Annual operating days | (days)(1) | — | 171 | 323 |
| Total material mined and milled | (kt) | — | 248 | 411 |
| Zinc average ore grade | (%) | — | 4.08 | 4.0 |
| Zinc concentrate | (kt) | — | 17.7 | 29.7 |
| Zinc concentrate average grade | (%) | — | 47.83 | 48.35 |
| Zinc average recovery | (%) | — | 83.77 | 87.29 |
| Lead average ore grade | (%) | — | 0.56 | 0.65 |
| Lead concentrate | (kt) | — | 2.4 | 4.6 |
| Lead concentrate average grade | (%) | — | 43.69 | 46.16 |
| Lead average recovery | (%) | — | 74.97 | 79.24 |

kt = thousand tons

(1) There were 365 days and 136 days of strike in 2008 and 2007, respectively. As a result it is estimated that Taxco lost 13,306 tons and 5,531 tons of zinc in concentrates and 2,233 tons and 873 tons of lead in concentrates in 2008 and 2007, respectively.

#### Processing Facilities - San Luis Potosi

Our San Luis Potosi electrolytic zinc refinery is located in the city of San Luis Potosi, in the state of San Luis Potosi, Mexico. The San Luis Potosi copper smelter is adjacent to the refinery. The city of San Luis Potosi is connected to our refinery and smelter by a major highway and our refinery and smelter are connected to each other by paved roads.

Smelter

The San Luis Potosi copper smelter has been in operation since 1925 and has gone through several phases of modernization, principally over the last ten years. The smelter presently has the capacity to process 230,000 tons of copper concentrate per year.

The plant operates one blast furnace (with a second on stand-by) that smelts incoming materials, mainly copper concentrates and copper by-products from lead plants, to produce a copper matte. The copper matte is then treated in one of the two Pierce Smith converters, producing copper blister (95.7% copper), which in 2008 contained approximately 2.1 ounces of gold and 360 ounces of silver per ton of copper blister produced. Of a total copper concentrate intake of 40,878 tons in 2008, approximately 29% was supplied by the IMMSA unit’s mines and the remaining amount was purchased from third parties. 25% of the blister production is sold to the La Caridad copper smelter and the remaining 75% is sold to third party refineries throughout the world.

The San Luis Potosi copper smelter’s equipment include two yard locomotives, two drag-shovels, twenty dump cars and six mechanic front loaders for the furnace charge mixing. Smelting and conversion equipment include three blast furnaces, two Pierce Smith converter furnaces, two molding furnaces, six electric front loaders, six towing units, three narrow way locomotives, two bridge cranes, two 7-ton cranes and three hoists. Venting system equipment includes nine fans with different capacities and two filtering bag houses. This plant has a smelting capacity of 24,000 tons of blister copper per year.

As the materials treated at the smelter contain various impurities (especially lead and arsenic), the facility has been equipped with an arsenic recovery plant for treatment of the flue dust produced in the blast furnace section. This material contains approximately 35% lead and 18% arsenic which, when treated, produces approximately 1,800 tons per year of high purity arsenic trioxide which is, in turn, sold in the United States principally to the wood preserving industry. Approximately 13,000 tons per year of lead bearing calcines (approximately 32% lead) are sold annually to Industrias Peñoles, S.A. de C.V. (“Peñoles”).

The table below sets forth 2008, 2007 and 2006 production information for our San Luis Potosi copper smelter:

|  |  | 2008 | 2007 | 2006 |
| --- | --- | ---: | ---: | ---: |
| Total copper concentrate smelted | (kt) | 40.9 | 48.1 | 48.1 |
| Blister copper production | (kt) | 19.0 | 20.8 | 20.2 |
| Silver in blister | (oz. per ton) | 360 | 397 | 460 |
| Gold in blister | (oz. per ton) | 2.1 | 1.5 | 1.6 |
| Copper average grade in blister | (%) | 96.0 | 96.06 | 96.75 |
| Average smelter recovery | (%) | 97.07 | 97.18 | 98.13 |
| Average realized price copper blister | ($ per pound) | 2.63 | 3.35 | 3.51 |

kt = thousand tons

Zinc Refinery

The San Luis Potosi electrolytic zinc refinery was built in 1982. It was designed to produce 105,000 tons of refined zinc per year by treating up to 200,000 tons of zinc concentrate from our own mines, principally Charcas, located only 113 kilometers from the refinery. The refinery produces special high grade zinc (99.995% zinc), high grade zinc (over 99.9% zinc) and zinc-based alloys with aluminum, lead, copper or magnesium in varying quantities and sizes depending on market demand.

The electrolytic zinc refinery’s major equipment includes a roaster with a capacity of 85 m2 of roasting area, a steam recovery boiler and an acid plant. There is a calcine processing area with five leaching stages: neutral, hot acid, intermediate acid, acid, purified fourth and jarosite, as well as two stages for solution purifying. Additionally, the equipment includes a cell house with two electrowinning circuits to finally obtain metallic zinc; an alloy and molding area with two induction furnaces and four molding systems, two of them with chains to produce 25 kilogram ingots; and two casting wheels to manufacture one ton Jumbo pieces. This refinery has a production capacity of 105,000 tons of refined zinc per year.

The table below sets forth 2008, 2007 and 2006 production information for our San Luis Potosi zinc refinery:

|  |  | 2008 | 2007 | 2006(1) |
| --- | --- | ---: | ---: | ---: |
| Total zinc concentrate treated | (kt) | 179.2 | 181.3 | 118.0 |
| Refined zinc produced | (kt) | 95.4 | 90.9 | 45.3 |
| Sulfuric acid produced | (kt) | 162.1 | 165.1 | 98.5 |
| Refined silver produced | (kt) | 10.0 | 10.3 | 9.2 |
| Refined gold produced | (k) | 6.0 | 5.0 | 7.0 |
| Refined cadmium produced | (kt) | 0.6 | 0.6 | 0.4 |
| Average refinery recovery | (%) | 95.2 | 94.0 | 73.35 |
| Average realized price refined zinc | ($ per lb) | 0.89 | 1.46 | 1.67 |
| Average realized price zinc concentrate | ($ per lb) | 0.88 | 1.57 | 1.46 |
| Average realized price silver | ($ per oz) | 13.82 | 13.02 | 11.45 |

kt = thousand tons

(1) Some production was lost due to a fire at the refinery in the first quarter of 2006.

Nueva Rosita Coal and Coke Complex

The Nueva Rosita coal and coke complex, which began operations in 1924, is located in the state of Coahuila, Mexico on the outskirts of the city of Nueva Rosita near the Texas border. It includes a) an underground coal mine, which has been closed as a result of a gas explosion in February 2006; b) an open pit mine with a yearly capacity of approximately 350,000 tons of coal; c) a coal washing plant completed in 1998 with a capacity of 900,000 tons per year that produces clean coal of a higher quality; and d) a re-engineered and modernized 21 coke oven facility capable of producing 105,000 tons of coke (metallurgical, nut and fine) per year of which 95,000 tons are metallurgical coke. There is also a by-product plant to clean the coke gas oven in which tar, ammonium sulfate and light crude oil are recovered. There are also boilers to produce 80,000 steam pounds that are used in the by-products plant. The re-engineering and modernization of 21 ovens was completed in April, 2006 and it is presently operating with no problems to report.

At present, the coke oven installation supplies the San Luis Potosi copper smelter with low-cost coke, resulting in significant cost savings to the smelter. The surplus production is sold to Peñoles and other Mexican consumers in northern Mexico. We expect to sell 37,438 tons of metallurgical coke in 2009.

Mine Exploration:

During 2008 there was no exploration activity at the Nueva Rosita unit.

The table below sets forth 2008, 2007 and 2006 production information for our Nueva Rosita coal and coke complex:

|  | 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Coal mined — underground mine (kt) | — | — | 29.4 |
| Coal mined — open pit (kt) | 296.8 | 97.4 | 185.9 |
| Total coal mined (kt) | 296.8 | 97.4 | 215.3 |
| Average BTU content BTU/Lb | 9,100.0 | 9,054.9 | 9,720.0 |
| Average percent sulfur% | 1.80 | 1.78 | 0.80 |
| Clean coal produced (kt) | 91.5 | 41.1 | 51.8 |
| Coke tonnage produced (kt) | 70.3 | 63.4 | 55.7 |
| Average realized price coal ($ per ton) | 27.70 | 29.01 | 25.49 |
| Average realized price arsenic clean coal ($ per ton) | 45.00 | — | 47.07 |
| Average realized price coke ($ per ton) | 213.62 | 197.0 | 222.35 |

kt = thousand tons

In the Pasta de Conchos mining complex within the mine there are five continuous mining circuits, six transporting cars, two locomotives, one long wall equipment and a cutting machine. There is also a hoist to transport materials inside the unit; a breaker in the surface to feed the washing plant; and a set of 21 coke ovens with a capacity of 100,000 coke tons per year. There is a by-product plant to clean the coke gas in which tar, ammonium sulfate and light crude oil are recovered. There are also two boilers which produce 80,000 steam pounds that are used in the by-products plant.

ORE RESERVES:

Ore reserves are those estimated quantities of proven and probable material that may be economically mined and processed for extraction of their mineral content, at the time of the reserve determination. “Proven” (measured) reserves are reserves for which (a) quantity is computed from dimensions revealed in outcrops, trenches, workings or drill holes; (b) grade and/or quality are computed from the results of detailed samplings; and (c) the sites for inspection, sampling and measurement are spaced so closely and the geologic character is so well defined that size, shape, depth and mineral content of reserves are well-established. “Probable” (indicated) reserves are reserves for which quantity and grade and/or quality are computed from information similar to that used for proven (measured) reserves, but the sites for inspection, sampling, and measurement are farther apart or are otherwise less adequately spaced. The degree of assurance, although lower than that for proven (measured) reserves, is high enough to assume continuity between points of observation. “Mineralized material,” on the other hand, is a mineralized body that has been delineated by appropriately spaced drilling and/or underground sampling to support the reported tonnage and average grade of metal(s). Such a deposit does not qualify as a reserve until legal and economic feasibility are concluded based upon a comprehensive evaluation of unit costs, grade, recoveries and other material factors.

Our proven and probable ore reserve estimates are based on engineering evaluations of assay values derived from the sampling of drill holes and other openings. We believe that the samplings taken are spaced at intervals sufficiently close enough and the geological characteristics of the deposits are sufficiently well defined to render the estimates reliable. The ore reserves estimates include assessments of the resource, mining and metallurgy, as well as economic, marketing, legal, environmental, governmental, social and other necessary considerations.

Our Peruvian operations, including the Toquepala and Cuajone reserves, are classified into proven (measured), probable (indicated) and possible (inferred) categories based on a RCB Index (Relative Confidence Bound Index) that measures our level of geologic knowledge and confidence in each block. The RCB index is a measure of relative confidence in the block grade estimate. This approach combines the local variability of the composites used to krig a block with the Kriging variance and incorporates the use of confidence intervals in measuring uncertainty of the block estimates relative to each other. The final resource classification is then based on the distribution of these RCB values for blocks above 0.05% copper. It is the distribution that is used to find the breaks between proven/probable and probable/possible.

In December 2006, we announced a significant increase in ore reserves at our Peruvian mines. Using a 90 cent per pound copper price assumption, ore reserves increased 83% in Toquepala and 8% in Cuajone. The metal content has increased by 61% in Toquepala and 22% in Cuajone, extending the life of the Toquepala mine by 23 years and the life of the Cuajone mine by three years.

Our Mexican operations, including the Cananea and La Caridad reserves, are calculated using a mathematical block model and applying the Mine-Sight software system. The estimated grades per block are classified as proven and probable. These grades are calculated applying a three-dimensional interpolation procedure and the inverse distance squared. Likewise, the quadrant method or spherical search is implemented in order to limit the number of composites that will affect the block’s interpolated value. The composites data is derived from the geological exploration of the ore body. In order to classify the individual blocks in the model, a thorough geostatistical variogram analysis is conducted, taking into consideration the principal characteristics of the deposit. Based on this block model classification, and with the implementation of the Lerch-Grossman algorithm, and the Mine-Sight Pit Optimizer procedure, mineable reserves are determined. The calculated proven and probable reserves include those blocks that are economically feasible to mine by open pit method within a particular mine design.

For the IMMSA unit, the basis for reserve estimations are sampling of mining operations and drilling exploration, geographical and topographic surveys, tracking down all the foregoing in the corresponding maps, measurement, calculations and interpretation based on the maps and reports from the mines, the mills and/or smelters. Mineral reserves are mineral stock which is estimated for extraction, to exploit if necessary, to sell or utilize economically, all or in part, taking into consideration the quotations, subsidies, costs, availability of treatment plants and other conditions which the Company estimates will prevail in the period for which reserves are being calculated. The reserves are divided into proven (85% reliable or more according to statistical studies) and probable (70-80% reliable or more according to statistical studies) categories according to their level of reliability and availability. In order to comply with SEC regulations, proven reserves is a classification that can only be used for such mineral found on top of the last level of the mine (either mineral up to 15 meters below the last level or below the first 15 meters only with sufficient drilling (25 or 30 meters between each drill)).

Annually our engineering department reviews in detail the reserve computations. In addition, the engineering department reviews the computation when changes in assumptions occur. Changes can occur for price or cost assumptions, results in field drilling or new geotechnical parameters. We also engage third party consultants to review mine planning procedures.

Pursuant to SEC guidance, the reserves information in this report are calculated using average metals prices over the most recent three years unless otherwise stated. We refer to these three-year average metals prices as “current prices.” Our current prices for copper are calculated using prices quoted by COMEX, and our current prices for molybdenum are calculated according to Platt’s *Metals Week.* Unless otherwise stated, reserves estimates in this report use $3.148 per pound for copper and $28.022 per pound for molybdenum, both current prices as of December 31, 2008. The current prices for copper and molybdenum were $2.664 and $28.987 as of December 31, 2007 and $2.020 and $24.315 as of December 31, 2006.

For production planning purposes our management uses long-term metals price assumptions for copper and molybdenum. These prices are intended to approximate average prices over the long term. Starting December 31, 2007 these price assumptions were changed to $1.20 per pound for copper and $9.00 per pound for molybdenum. Average metal prices over the last 10 and 15 year periods and the continued positive outlook for these metals have led us to reappraise our view of prices. In prior years, we used metals price assumptions of $0.90 per pound for copper and $5.00 per pound for molybdenum.

For the years 2008, 2007 and 2006, we have used reserves estimates based on current average prices as of the most recent year then ended to determine amortization of mine development and intangible assets, for the years prior to 2006 the same reserve calculation was used to determine the amount of mine stripping that was capitalized and units of production amortization of capitalized mine stripping.

We periodically reevaluate estimates of our ore reserves, which represent our estimate as to the amount of unmined copper remaining in our existing mine locations that can be produced and sold at a profit. These estimates are based on engineering evaluations derived from samples of drill holes and other openings, combined with assumptions about copper market prices and production costs at each of our mines.

The persons responsible for ore reserve calculations are as follows:

Peruvian open pit:

Cuajone mine — Enrique A. Paredes, Mine Manager

Toquepala mine — Luis O. Ticona, Mine Manager

Mexican open pit:

La Caridad Mine - Marco A. Figueroa, Engineering and Mine Planning Superintendent

Cananea mine — Jesus Molinares, Engineering and Mine Planning Superintendent

IMMSA Unit:

Santa Barbara - Jorge M. Espinosa, Planning and Control Superintendent

Charcas - Jose P. Guerrero, Planning and Control Superintendent

Santa Eulalia — Guillermo Garcia, Planning and Control Superintendent

Taxco - Marco A. Gonzalez, Regional Geologist

San Martin - Maria I. Carrillo, Chief Engineer

For more information regarding our reserve estimates, please see “Management’s Discussion and Analysis of Financial Conditions and Results of Operations—Critical Accounting Policies and Estimates—Ore Reserves.”

The table below details our proven and probable copper and molybdenum reserves as estimated at December 31, 2008.

| Mineral Reserves Metal prices: | PERUVIAN OPEN-PIT UNIT Cuajone Mine (1) | Toquepala Mine (1) | MEXICAN OPEN-PIT UNIT Cananea Mine (1) | La Caridad Mine (1) | TOTAL OPEN-PIT MINES | MEXICAN IMMSA UNIT IMMSA (2) | Sensitivity to Change in metals prices (3) Increase 20% | Decrease 20% |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Copper ($/lb.) | 3.148 | 3.148 | 3.148 | 3.148 | 3.148 | 3.148 | 3.778 | 2.519 |
| Molybdenum ($/lb.) | 28.022 | 28.022 | 28.022 | 28.022 | 28.022 | 28.022 | 33.626 | 22.417 |
| Cut-off grade | 0.135% | 0.139% | 0.106% | 0.085% | 0.114% |  | 0.098% | 0.144% |
| Sulfide ore reserves (thousands of tons) | 2,446,155 | 4,294,020 | 6,684,931 | 3,800,122 | 17,225,228 | 48,340 | 18,380,324 | 15,219,550 |
| Average grade: |  |  |  |  |  |  |  |  |
| Copper | 0.517% | 0.442% | 0.378% | 0.223% | 0.379% | 0.470% | 0.365% | 0.408% |
| Molybdenum | 0.019% | 0.021% | — | 0.029% | 0.024% | — | 0.024% | 0.024% |
| Lead | — | — | — | — | — | 0.880% | — | — |
| Zinc | — | — | — | — | — | 3.140% | — | — |
| Leachable material (thousands of tons) | 19,257 | 1,304,621 | 1,773,625 | 1,145,308 | 4,242,811 | — | 4,039,305 | 4,864,465 |
| Leachable material grade | 0.454% | 0.064% | 0.127% | 0.117% | 0.106% | — | 0.091% | 0.131% |
| Waste (thousands of tons) (5) | 7,566,914 | 13,835,964 | 6,833,021 | 1,122,993 | 29,358,892 | — | 30,024,856 | 28,059,125 |
| Total material (thousands of tons) | 10,032,326 | 19,434,605 | 15,291,577 | 6,068,423 | 50,826,931 | — | 52,444,485 | 48,143,140 |
| Stripping ratio | 3.10 | 3.53 | 1.29 | 0.60 | 1.95 | — | 1.85 | 2.16 |
| **Leachable material** |  |  |  |  |  |  |  |  |
| Reserves in stock (thousands of tons) | 19,525 | 1,014,789 | 707,552 | 551,344 | 2,293,210 | — | 2,293,210 | 2,293,210 |
| Average copper grade | 0.474% | 0.146% | 0.127% | 0.251% | 0.168% | — | 0.168% | 0.168% |
| In pit reserves (thousands of tons) | 19,257 | 1,304,621 | 1,773,625 | 1,145,308 | 4,242,811 | — | 4,039,305 | 4,864,465 |
| Average copper grade | 0.454% | 0.064% | 0.127% | 0.117% | 0.106% | — | 0.091% | 0.131% |
| Total leachable reserves (thousands of tons) | 38,782 | 2,319,410 | 2,481,177 | 1,696,652 | 6,536,021 | — | 6,332,515 | 7,157,675 |
| Average copper grade | 0.464% | 0.100% | 0.127% | 0.160% | 0.128% | — | 0.119% | 0.143% |
| **Copper contained in ore reserves (thousand of tons) (4)** | **12,734** | **19,815** | **27,522** | **9,813** | **69,884** | **227** | **70,732** | **68,488** |

(1) The Cuajone, Toquepala, Cananea and La Caridad concentrator recoveries calculated for these reserves were 85.7%, 86.8%, 81.0% and 83.0%, respectively, obtained by using recovery formulas according to the different milling capacity and geo-metallurgical zones.

(2) The IMMSA unit includes the Charcas, Santa Barbara, San Martin, Santa Eulalia and Taxco mines. Zinc and lead contained in ore reserves are 1,518 and 425 thousand tons, respectively.

(3) In preparing the sensitivity analysis, we recalculated our reserves based on the assumption that current average metal prices were 20% higher and 20% lower, respectively, than the actual current average prices for year-end 2008. Reserve results of this sensitivity analysis are not proportional to the increase or decrease in metal price assumptions. The analysis above does not include our IMMSA unit’s underground mines, for which the sensitivity analysis is as follows:

|  | Sensitivity to 20% Change in Metals Prices Increase 20% | Decrease 20% |
| --- | ---: | ---: |
| Sulfide ore reserves (thousands of tons) | 48,831 | 46,553 |
| Average grade copper | 0.46% | 0.47% |
| Copper contained (thousands of tons) | 225 | 219 |

(4) Copper contained in ore reserves for open-pit mines is (i) the product of sulfide ore reserves and the average copper grade plus (ii) the product of in-pit leachable reserves and the average copper grade. Copper contained in ore reserves for underground mines is the product of sulfide ore reserves and the average copper grade.

The table below details our proven and probable copper and molybdenum reserves as of December 31, 2008 calculated based on long-term price assumptions of, $1.20 for copper and $9.00 for molybdenum.

| Mineral Reserves Metal prices: | Cuajone Mine | Toquepala Mine | Cananea Mine | La Caridad Mine | Total Open-Pit Mines | IMMSA (1) |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Copper ($/lb.) | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 |
| Molybdenum ($/lb.) | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| Cut-off grade | 0.303% | 0.321% | 0.366% | 0.181% | 0.310% | — |
| Sulfide ore reserves (thousands of tons) | 1,601,229 | 2,018,318 | 1,833,860 | 888,193 | 6,341,600 | 34,307 |
| Average grade: |  |  |  |  |  |  |
| Copper | 0.558% | 0.594% | 0.624% | 0.344% | 0.559% | 0.550% |
| Molybdenum | 0.020% | 0.035% | — | 0.028% | 0.028% | — |
| Lead | — | — | — | — | — | 1.000% |
| Zinc | — | — | — | — | — | 3.330% |
| Leachable material |  |  |  |  |  |  |
| (thousands of tons) | 11,602 | 1,953,365 | 3,117,556 | 1,587,596 | 6,669,579 | — |
| Leachable material grade | 0.581% | 0.199% | 0.268% | 0.177% | 0.227% | — |
| Waste (thousands of tons) | 3,668,193 | 8,149,976 | 2,719,387 | 426,392 | 14,963,948 | — |
| Total material (thousands of tons) | 5,280,484 | 12,121,659 | 7,670,803 | 2,902,181 | 27,975,127 | — |
| Stripping ratio | 2.30 | 5.01 | 3.18 | 2.27 | 3.41 | — |
| **Leachable material** |  |  |  |  |  |  |
| Reserves in stock (thousands of tons) | 19,525 | 1,014,789 | 707,552 | 551,344 | 2,293,210 | — |
| Average copper grade | 0.474% | 0.146% | 0.127% | 0.251% | 0.168% | — |
| In-pit reserves (thousands of tons) | 11,062 | 1,953,365 | 3,117,556 | 1,587,596 | 6,669,789 | — |
| Average copper grade | 0.581% | 0.199% | 0.268% | 0.177% | 0.227% | — |
| Total leachable reserves (thousands of tons) | 30,587 | 2,968,154 | 3,825,108 | 2,138,940 | 8,962,789 | — |
| Average copper grade | 0.513% | 0.181% | 0.242% | 0.196% | 0.212% | — |
| **Copper contained in ore reserves (thousands of tons) (2)** | **8,999** | **15,876** | **19,798** | **5,865** | **50,538** | **189** |

(1) The IMMSA unit includes the Charcas, Santa Barbara, San Martin, Santa Eulalia and Taxco mines. Zinc and lead contained in ore reserves are 1,142 and 343 thousand tons, respectively.

(2) Copper contained in ore reserves for open-pit mines is (i) the product of sulfide ore reserves and the average copper grade plus (ii) the product of in-pit leachable reserves and the average grade of copper. Copper contained in ore reserves for underground mines is the product of sulfide ore reserves and the average copper grade.

OVERVIEW OF BLOCK MODEL RECONCILIATION PROCESS

We apply the following block model to mill reconciliation procedure.

The following stages are identified at the Cuajone, Toquepala, Cananea and La Caridad mines:

1\. The mine geologists gather the necessary monthly statistical data from our information system (“SRP”), which provides ore tons milled and ore grades in the concentrator.

2\. Mined areas are topographically determined and related boundaries are built.

3\. Using the “interactive planner” option in our mining software (Minesight), ore tons and grades are calculated inside mined areas over the block model. At this point the current cut-off grade is considered.

4\. In the final stage, accumulated tons mined, weighted average grade for ore material and leach is compared with data coming from our SRP system.

Tonnage and grade reconciliation for 2008 are as follows:

| Mine | Long Range Model Tons (thousands) | % Copper | Mill Tons (thousands) | % Copper | Variance Tons (thousands) | % Copper |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Cuajone | 30,374 | 0.755 | 30,217 | 0.751 | 157 | 0.004 |
| Toquepala | 21,757 | 0.607 | 21,328 | 0.608 | 429 | (0.001) |
| Cananea | 12,852 | 0.633 | 12,545 | 0.630 | 307 | 0.003 |
| La Caridad | 32,332 | 0.374 | 31,779 | 0.380 | (553) | 0.016 |

If the estimation error appears greater than 3%, a detailed evaluation is done to review the differences, which normally could result in more in-fill drilling, in order to better understand the geological characteristics (grade, rock type, mineralization and alteration) and the spacing of drill holes which are considered in the ore body zone.

AVERAGE DRILL-HOLE SPACING

The following is the average drill-hole spacing for proven and probable sulfide reserves:

As of December 31, 2008

|  | Proven (average spacing in meters) | Probable |
| --- | ---: | ---: |
| Cuajone | 87.22 | 124.37 |
| Toquepala | 80.32 | 113.18 |
| Cananea | 51.96 | 100.94 |
| La Caridad | 44.40 | 101.54 |

69

## Legal proceedings

As filed, 156 characters.

Reference is made to the information under the caption “Litigation Matters” in the consolidated financial statement Note 14 “Commitments and Contingencies.”

## Management's discussion and analysis

As filed, 94,415 characters.

EXECUTIVE SUMMARY

*This Management’s Discussion and Analysis of Financial Condition and Results of Operations relates to and should be read together with our Audited Consolidated Financial Statements as of and for each of the years in the three-year period ended December 31, 2008. Therefore, unless otherwise noted, the discussion below of our financial condition and results of operations is for us, including our Minera Mexico subsidiary, on a consolidated basis for all periods. Our financial results may not be indicative of our future results.*

*This discussion contains forward-looking statements that are based on management’s current expectations, estimates and projections about our business and operations. Our actual results may differ materially from those currently anticipated and expressed in the forward-looking statements as a result of a number of factors. See “Cautionary Statements.”*

OVERVIEW

Our business is primarily the production and sale of copper. In the process of producing copper, a number of valuable metallurgical by-products are recovered, such as molybdenum, zinc, silver, lead and gold, which we also produce and sell. Market forces outside of our control largely determine the sales prices for our products. Our management, therefore, focuses on copper production, cost control, production enhancement and maintaining a prudent capital structure to remain profitable. We believe we endeavor to achieve these goals through capital spending programs, exploration efforts and cost reduction programs. Our aim is to remain profitable during periods of low copper prices and to maximize financial performance in periods of high copper prices.

Since our inception, we have principally maintained operations in Peru. However, in recent years, we have refocused our strategies to internationalize our business and broaden our market exposure. In 2003, we acquired exploration properties in Chile, which are being evaluated for potential exploitation and, in 2005 we acquired Minera Mexico, with substantial mining operations in Mexico. The acquisition was accounted for in a manner similar to a pooling of interests as it involved the reorganization of entities under common control.

The year 2008 was a turbulent time for the world’s economies and it appears to us that this will continue at a minimum through 2009. The sub-prime mortgage crisis in the United States led to liquidity issues at the major financial institutions and this spread through most of the industrialized world. These problems began to have a significant effect on our industry in the third quarter of 2008 and continued through the balance of the year as metal prices declined. The LME copper price ended 2007 at $3.03 per pound and averaged $3.62 per pound for the first three quarters of 2008; the copper price in the fourth quarter, however, averaged $1.77 per pound and ended the year at $1.32 per pound. Early in 2009, through mid-February we see copper averaging about $1.49 per pound. These metal prices are being influenced by current economic distress and also by inventory adjustments (draw-downs) by the worlds’ copper consumers. We anticipate that the inventory adjustments will be completed later in 2009 and that demand will rise afterwards. However, it is difficult to predict with any accuracy when this will occur.

While we are experiencing a major downturn, it must be remembered that we are in a cyclical industry and have historically operated through these up and down periods. Our Company’s strengths lie in our ore reserves, our low operating costs, our strong cash position of $716.7 million and our low debt level of $1.3 billion, with no significant principal payments until 2015, which we believe will permit us to maintain our profitability and positive cash flow. Nevertheless, we have suspended most of our capital investments in new as well as in expansion projects, as we believe this prudence and business discipline is needed during the current low commodity cycle.

By most objective results 2008 was a good year for our Company. Sales of $4.9 billion and net earnings of $1.4 billion were the third highest in our history, and dividend distributions to our shareholders of $1.7 billion were the second highest in our history. Additionally, the average 2008 LME price of copper of $3.16 per pound and the average molybdenum price of $28.42 were the second and third highest average prices, respectively, for these metals. However, the year closed with declining metal prices and resulted in a fourth quarter loss of $124.7 million, the first such loss of our Company since we combined our Peruvian operations with Minera Mexico in 2005. The declining fourth quarter metal prices also created an adjustment to sales to write down provisionally priced sales to the lower realized prices and lower future prices. This occurred as much of our copper, and almost all of our molybdenum sales, take their final price in months subsequent to shipment. Sales value for these provisionally priced shipments are recorded at prices in effect at the time of shipment, so that in a time of decreasing metal prices prior months sales create a negative adjustment to sales. The effect in 2008 of the provisional price adjustment was a reduction in net sales of $403.5 million and an estimated reduction in net earnings of $251.5 million.

Net sales for 2008 were $4.9 billion, as compared to $6.1 billion in 2007. The year end drop off in prices and lower volumes caused this decrease. Net earnings for 2008 were $1.4 billion, as compared to $2.2 billion in 2007, this decrease was primarily caused by the decreasing metal prices and lower sales volumes and higher 2008 production cost. In 2008, capital spending and exploration spending totaled $553.6 million, as compared to $356.0 million in 2007. Included in 2008 spending is $118.0 million for the Tia Maria project and $37.7 million for the Toquepala expansion project. In 2008 we distributed $1.7 billion in cash dividends to our shareholders, as compared to $2.0 billion in 2007. In light of the current economic situation we will continue to monitor dividend distributions throughout 2009. Please see our dividend policy under “other liquidity considerations” in this item.

In 2008 copper mine production decreased by 227.6 million pounds from prior year, largely as a result of the strike at our Cananea mine. Zinc and silver production, in 2008 also decreased, while molybdenum production increased slightly. Despite these decreases, we exceeded our production objectives at the open pit mines of Toquepala, Cuajone and La Caridad, as well as at the IMMSA underground units of Charcas, Santa Eulalia, Santa Barbara, the coking facility at Nueva Rosita and the La Caridad precious metals plant.

A continuing area of concern for our Company is the strike at our Cananea mine, as well as Taxco and San Martin. This strike began in July 2007 and continues into 2009. While positive judicial rulings have been issued a number of times, these have been generally followed by appeals that reversed the previous decisions. Most recently, in December 2008, the Mexican Federal Labor Court ruled in favor of the Company and declared the strike illegal. The union appealed this decision and on January 7, 2009, the judge of the fifth district on labor matters annulled the favorable decision to the Company. We have filed a request for a review of this ruling before an appellate federal court. We will continue to pursue a favorable resolution of the labor stoppage. It is expected that production at Cananea will remain suspended until these labor issues are resolved. We estimate that these strikes have reduced production of copper and zinc in 2008 by 425.6 million pounds and 52.0 million pounds, respectively, and have reduced operating income by approximately $1.1 billion. We are hopeful of resolving these strikes in 2009, but it is difficult to predict with any accuracy when this will occur.

We discuss below several matters that we believe are important to understand our results of operations and financial condition. These include, (i) our “operating cash costs” as a measure of our performance, (ii) metal prices, (iii) business segments, (iv) the effect of inflation and other local currency issues and (v) our expansion and modernization program and environmental protection program.

#### Operating Cash Costs

An overall benchmark used by us and a common industry metric to measure performance is operating cash costs per pound of copper produced. Operating cash cost is a non-GAAP measure that does not have a standardized meaning and may not be comparable to similarly titled measures provided by other companies. A reconciliation of our operating cash cost per pound to the cost of sales (exclusive of depreciation, amortization and depletion) as presented in the consolidated statement of earnings is presented under the subheading, “Non-GAAP Information Reconciliation,” below. We have defined operating cash cost per pound as cost of sales (exclusive of depreciation, amortization and depletion); plus selling, general and administrative charges, treatment and refining charges and by-products revenue and sales premiums; less workers’ participation and other miscellaneous charges, including the Peruvian royalty charge and the change in inventory levels; divided by total pounds of copper produced and purchased by us. In our calculation of operating cash cost per pound of copper produced, we credit against our costs the revenues from the sale of by-products, principally molybdenum, zinc, silver and the premium over market price that we receive on copper sales. We account for the by-product revenue in this way because we consider our principal business to be the production and sale of copper. We believe that our Company is viewed by the investment community as a copper company, and is valued, in large part, by the investment community’s view of the copper market and our ability to produce copper at a reasonable cost. We also include copper sales premiums as a credit, as these amounts are in excess of published copper prices. The increase in recent years in the price of molybdenum, as well as increases in silver and zinc, has had a significant effect on our traditional calculation of cash cost and its comparability between periods. Accordingly, we present cash costs with and without crediting the by-product revenues against our costs.

We exclude from our calculation of operating cash cost depreciation, amortization and depletion, which are considered non-cash expenses. Exploration is considered a discretionary expenditure and is also excluded. Workers’ participation provisions are determined on the basis of pre-tax earnings and are also excluded. Additionally excluded from operating cash costs are items of a non-recurring nature and the royalty charge.

Our operating cash costs per pound, as defined, are presented in the table below for the three years ended December 31, 2008. We present cash costs with and without the inclusion of by-product revenues.

| (Cents per pound) | 2008 | 2007 | 2006 | Positive (negative) Variance 2008-2007 | 2007-2006 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Operating cash cost per pound of copper produced and purchased | 34.1 | (13.3) | 15.9 | (47.4) | 29.2 |
| Less: by-products revenue | 137.3 | 151.3 | 112.4 | (14.0) | 38.9 |
| Operating cash cost per pound of copper produced and purchased without by-products revenue | 171.4 | 138.0 | 128.3 | (33.4) | (9.7) |

2008 against 2007:

As seen on the chart above, our cash cost per pound for 2008 when calculated with by-products revenue are costs of 34.1 cents per pound compared with a credit of 13.3 cents per pound in 2007. The decrease in the by-products credit in the 2008 period was largely due to lower molybdenum prices especially in the last quarter of the year. The effect of lower molybdenum prices reduced the by-products credit by approximately 13.7 cents per pound for 2008.

Our per pound cash cost, excluding by-product revenues, were higher by 33.4 cents per pound in 2008 compared to 2007 due to a decrease of 17.4% in copper production, principally as a result of the Cananea mine strike, which increased cash cost by 18.1 cents and the higher power and fuel cost which increased cash cost by 9.9 cents.

2007 against 2006:

Our cash cost per pound for 2007 when calculated with by-products revenue was a credit of 13.3 cents per pound compared with a cost of 15.9 cents per pound in 2006. The increase in the by-products credit in the 2007 period was largely due to higher molybdenum prices and sales volume. The credit for molybdenum sales was 84.9 cents per pound in 2007 as compared to 42.0 cents per pound in 2006.

Our cash cost, excluding by-product revenues, were higher by 9.7 cents per pound in 2007 compared to 2006 and this was due to 15.8 cents of higher production cost (mainly labor, power and fuel cost) as well as to 6.5 cents per pound of higher freight due to the sale of concentrates which were partially offset by 11.8 cents per pound of lower purchases of third-party metals.

#### Metals Prices

The profitability of our operations is dependent on, and our financial performance is significantly affected by, the international market prices for the products we produce, especially for copper, molybdenum, zinc and silver. Metals prices historically have been subject to wide fluctuations and are affected by numerous factors beyond our control. These factors, which affect each commodity to varying degrees, include international economic and political conditions, levels of supply and demand, the availability and cost of substitutes, inventory levels maintained by producers and others and, to a lesser degree, inventory carrying costs and currency exchange rates. In addition, the market prices of certain metals have on occasion been subject to rapid short-term changes due to speculative activities.

We are subject to market risks arising from the volatility of copper and other metals prices. Assuming that expected metal production and sales are achieved, that tax rates are unchanged and giving no effects to potential hedging programs, metal price sensitivity factors would indicate the estimated change in net earnings resulting from metal price changes in 2009 as provided in the table below:

|  | Copper | Molybdenum | Zinc | Silver |
| --- | ---: | ---: | ---: | ---: |
| Change in metal prices (per pound except silver — per ounce) | $0.01 | $1.00 | $0.01 | $1.00 |
| Change in net earnings (in millions) | $6.0 | $22.4 | $1.3 | $9.7 |

#### Business Segments

We view our Company as having three operating segments and manage on the basis of these segments. These segments are (1) our Peruvian operations, (2) our Mexican open-pit operations and (3) our Mexican underground operations, known as our IMMSA unit. Our Peruvian operations include the Toquepala and Cuajone mine complexes and the smelting and refining plants, industrial railroad and port facilities which service both mines. The Peruvian operations produce copper, with significant by-product production of molybdenum, silver and other material. Our Mexican open-pit operations include La Caridad and Cananea mine complexes, the smelting and refining plants and support facilities which service both mines. The Mexican open pit operations produce copper, with significant by-products production of molybdenum, silver and other material. Our IMMSA unit includes five underground mines that produce zinc, lead, copper, silver and gold, a coal mine which produces coal and coke, and several industrial processing facilities for zinc, copper and silver.

Segment information is included in our review of “Results of Operations” and also in Note 20 of our consolidated financial statements.

#### Inflation and Devaluation of the Peruvian Nuevo Sol and the Mexican Peso

Our functional currency is the U.S. dollar. Portions of our operating costs are denominated in Peruvian nuevos soles and Mexican pesos. Since our revenues are primarily denominated in U.S. dollars, when inflation/deflation in Peru or Mexico is not offset by a change in the exchange rate of the nuevo sol or the peso, respectively, to the dollar, our financial position, results of operations and cash flows could be adversely affected to the extent that the inflation/devaluation effects are passed onto us by our suppliers or reflected in our wage adjustments. In addition, the dollar value of our net monetary assets denominated in nuevos soles or pesos can be affected by devaluation of the nuevo sol or the peso, resulting in a remeasurement loss in our financial statements. Recent inflation and devaluation rates are provided in the table below.

| Peru | Year Ended December 31, 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Peruvian inflation rate | 6.6% | 3.9% | 1.1% |
| Nuevo sol/dollar devaluation/(appreciation) rate | 4.8% | (6.3)% | (6.8)% |
| Mexico |  |  |  |
| Mexican inflation rate | 6.5% | 3.8% | 4.1% |
| Peso/dollar devaluation/(appreciation) rate | 24.5% | (0.1%) | 1.5% |

#### Capital Expansion Program

We made capital expenditures of $516.7 million, $315.7 million and $455.8 million in 2008, 2007 and 2006, respectively, and we expect to make capital expenditures, of approximately $392.6 million in 2009. In general, the capital expenditures and projects described below are intended to increase production and/or decrease costs.

The table below sets forth our capital expenditures for the years ended December 31, 2008, 2007 and 2006:

*(dollars in millions)*

| Projects | Year Ended December 31, 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Ilo smelter modernization (including marine trestle) | $6.6 | $21.0 | $160.9 |
| Tia Maria — Arequipa —Peru | 118.0 |  |  |
| Cuajone ball mill | 1.4 | 10.0 | 0.4 |
| Toquepala crushing, conveying system for leach material | 0.1 | 2.0 | 3.3 |
| Toquepala concentrator expansion | 37.7 | — | — |
| Cuajone concentrador expansion | 18.2 |  |  |
| Tailings disposal — Quebrada Honda dam | 21.7 | 13.8 | 2.5 |
| Cuajone leaching pad | — | 1.4 | 2.4 |
| PLS dams at Huanaquera | 0.3 | 10.5 | 15.6 |
| Pilares Mine | 20.0 | — | — |
| La Caridad tailings dam - internal dikes | 2.1 | 2.1 | 3.4 |
| Metallurgical laboratory — La Caridad | 1.5 | 1.8 | — |
| La Caridad gas handling system | 11.3 | 12.2 | 4.7 |
| La Caridad by-products treatment plant | 6.9 | — | — |
| La Caridad Vertical lime kiln | 7.1 | 2.0 | 0.5 |
| PLS dams and leaching system Cananea | — | 4.1 | 0.8 |
| Cananea SX/EW plant III | — | 0.2 | 1.9 |
| Cananea crusher and conveyors system for leach material Phases II and III | 13.6 | 21.5 | 7.2 |
| La Caridad crusher high efficiency system | 2.8 | — | — |
| Nueva Rosita coke furnaces | — | — | 3.5 |
| San Martin underground shaft | — | — | 2.6 |
| La Caridad tailings dam growth — Concentrator | — | 1.9 | — |
| El Arco feasibility study, land a water | 3.9 | — | — |
| Santa Barbara Segovedad II mine expansion and conveyor and main substation | 6.5 | 3.7 | 0.8 |
| Total project expenditures | 279.7 | 108.2 | 210.5 |
| Replacement capital expenditures: |  |  |  |
| Mexico | 138.4 | 139.0 | 177.1 |
| Peru | 98.5 | 68.5 | 68.2 |
| Total replacement expenditures | 236.9 | \_207.5 | 245.3 |
| Total capital expenditures | $516.6 | $315.7 | $455.8 |

In light of the current business environment we have suspended most of our capital investments in new as well as in expansion projects. Set forth below are descriptions of some of our current expected capital expenditures. The Company expects to meet the cash requirements for these projects from cash on hand, internally generated funds and from additional external financing if required.

Peruvian Operations:

Tia Maria: The Tia Maria project, which includes the Tia Maria and the La Tapada deposits, is located in the department of Arequipa on the southern coast of Peru and is part of a copper porphyritic system.

The feasibility studies in 2008 for Tia Maria show 193 million tons of mineralized material with 0.302% copper content. For La Tapada, the estimated mineralized resources show 445 million tons of mineralized material, with 0.434% copper content. In 2008 the Company completed the basic engineering and started the detailed engineering studies for the project. The environmental impact assessment is expected to be completed in the second quarter of 2009.

As of December 31, 2008, we have spent $118.0 million for the Tia Maria project. We are currently evaluating whether to put on hold or to slow down the spending in light of current market conditions and capital equipment cost. We estimate spending $140.0 million on this project during 2009, which includes funds necessary to complete environmental and engineering studies, as well as spending previously committed. When completed the new operating unit is expected to produce 120,000 tons of copper cathodes per year.

Toquepala concentrator expansion: As of December 31, 2008, we have spent $37.7 million for the Toquepala expansion. This project is designed to increase annual Toquepala copper production by approximately 100,000 tons per year. We completed the feasibility study. The basic engineering is almost completed and detailed engineering will be started. The environmental impact assessment is also underway and is expected to be completed in the fourth quarter of 2009. We expect to spend $113.0 million in 2009, to complete studies and for previously committed orders. After that we will put on hold making any new additional capital spending commitments for this project.

Cuajone concentrator expansion: For the Cuajone concentrator expansion project we have completed the feasibility study and will only continue at this point with the environmental impact assessment. However, any further spending is being deferred pending improvement in economic conditions.

Ilo Smelter Modernization: This project was completed in January 2007 and has allowed our Company to increase sulfur capture over the 92% requirement established in our agreement with the Peruvian government. A complimentary project to the Ilo smelter modernization is the construction of a marine trestle to offload the sulfuric acid produced at the smelter directly to offshore ships. At December 31, 2008 this project reached 66% completion and is expected to be completed in June 2009. The completed project is expected to ease congestion in our Ilo area.

Tailings disposal at Quebrada Honda: This project will increase the height of the existing Quebrada Honda dam to impound future tailings from the Toquepala and Cuajone mills. The procurement of the main equipment and materials was finished. Construction of the main civil and mechanical and electrical installations for the main and lateral dams has been completed. The lateral dam was commissioned in December 2008 and the main dam will be commissioned in February 2009. Progress on the first stage of this project is 99.7% complete and the balance is expected to be completed by March 2009. The total cost of this project is estimated to be $66.0 million, with $38.0 million expended through December 31, 2008.

Mexican operations:

The Company will continue with the environmental projects at its mining and metallurgical facilities. At La Caridad metallurgical complex the gas handling and dust and effluent treatment projects are being completed. These projects are at 93% and 70% of completion, respectively, and have a combined budget of $9.0 million for 2009.

The Agua Prieta lime plant modernization project, in the Mexican state of Sonora, is moving forward to completion. When finished, this project is expected to reduce the annual lime cost of our Mexican operations by approximately $9.0 million. The capital budget for this project is $14.0 million.

Other Expenditures:

Regarding our copper deposit projects at Los Chancas in Peru, El Arco, Pilares and the underground polymetallic mine in Angangueo in Mexico, we will continue to evaluate them, but will defer making a final decision until economic conditions improve.

All capital projects related to Cananea are on hold pending resolution of the labor situation. These include the new SX-EW plant, the concentrator expansion and a molybdenum circuit at this operation.

Potential Projects:

We have a number of projects that we may develop in the future. We evaluate new projects on the basis of our long-term corporate objectives, expected return, environmental needs, required investment and estimated production, among other considerations. All capital expenditures have been stopped or are under review. We believe that this discipline is required in response to the weakened commodity prices and economic uncertainties.

The above information are estimates only. We cannot make any assurance that we will undertake any of these projects or that the information noted is accurate.

CRITICAL ACCOUNTING POLICIES AND ESTIMATES

Our significant accounting policies are discussed in Note 2, Summary of Significant Accounting Policies, of the Notes to Consolidated Financial Statements, included in Item 8, Financial Statements and Supplementary Data of this Annual Report on Form 10-K.

Our discussion and analysis of financial condition and results of operations, as well as quantitative and qualitative disclosures about market risks, are based upon our consolidated financial statements, which have been prepared in accordance with U.S. GAAP. Preparation of these consolidated financial statements requires our management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosures of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. We make our best estimate of the ultimate outcome for these items based on historical trends and other information available when the financial statements are prepared. Changes in estimates are recognized in accordance with the accounting rules for the estimate, which is typically in the period when new information becomes available to management. Areas where the nature of the estimate makes it reasonably possible that actual results could materially differ from amounts estimated include: ore reserves, revenue recognition, estimated mine stripping ratios, leachable material and related amortization, the estimated useful lives of fixed assets, asset retirement obligations, litigation and contingencies, valuation allowances for deferred tax assets, tax positions, fair value of financial instruments, and inventory obsolescence. We base our estimates on historical experience and on various other assumptions that we believe to be reasonable under the circumstances. Actual results may differ from these estimates under different assumptions or conditions.

Ore Reserves: For purposes of our long-term production planning, we use metal price assumptions of $1.20 per pound for copper and $9.00 per pound for molybdenum. Prior to 2007, we used $0.90 per pound and $5.00 per pound for copper and molybdenum, respectively. These prices are intended to approximate average prices over the long term. Ore reserves based on these prices are the basis for our internal planning, including the preparation of the mine plans for our mines. Our management uses these price assumptions, as it believes these prices reflect the full price cycle of the metals market.

However, pursuant to SEC guidance, the reserve information in this report is calculated using average metals prices over the most recent three years, except as otherwise stated. We refer to these three-year average metals prices as “current average prices.” Our current average prices for copper are calculated using prices quoted by COMEX, and our current average prices for molybdenum are calculated using prices published in *Platt’s Metals Week.* Unless otherwise stated, reserves estimates in this report use $3.15 per pound for copper and $28.02 per pound for molybdenum, both current average prices as of December 31, 2008. The current average per pound prices for copper and molybdenum were $2.66 and $28.99, respectively, as of December 31, 2007 and $2.02 and $24.31, respectively, as of December 31, 2006.

Certain financial information is based on reserve estimates calculated on the basis of current average prices. These include amortization of intangible assets and mine development.

Leachable Material: At one of our Mexican mines, we capitalize the cost of materials with low copper content extracted during the mining process (leachable material), which is collected in leach dumps. The amortization of the capitalized cost is determined based on the depletion period of the leach dumps, which is estimated to be five years.

If we were to have expensed all capitalized leaching costs associated with this mining operation as incurred, net operating cost would have decreased by $57.6 million and $10.1 million for the years 2008 and 2007, respectively, and increased $19.3 million for the year 2006.

Asset Retirement Obligation: Our mining and exploration activities are subject to various laws and regulations governing the protection of the environment. Accounting for reclamation and remediation obligations requires management to make estimates unique to each mining operation of the future costs we will incur to complete the reclamation and remediation work required to comply with existing laws and regulations. These estimates are based in part on our inflation and credit rate assumptions. Actual costs incurred in future periods could differ from amounts estimated. Additionally, future changes to environmental laws and regulations could increase the extent of reclamation and remediation work required to be performed by us. Any such increases in future costs could materially impact the amounts charged to operations for reclamation and remediation.

We further discuss our Asset Retirement Obligation in Note 10 to our consolidated financial statements included herein.

Revenue Recognition: For certain of our sales of copper and molybdenum products, customer contracts allow for pricing based on a month subsequent to shipping, generally ranging between one and six months subsequent to shipment. In such cases, revenue is recorded at a provisional price at the time of shipment. The provisionally priced copper sales are adjusted to reflect forward LME or COMEX copper prices at the end of each month until a final adjustment is made to the price of the shipments upon settlement with customers pursuant to the terms of the contract. In the case of molybdenum sales, for which there are no published forward prices, the provisionally priced sales are adjusted to reflect the market prices at the end of each month until a final adjustment is made to the price of the shipments upon settlement with customers pursuant to the terms of the contract. (See details under “Provisionally prices sales” below).

Derivative Instruments: We utilize certain types of derivative financial instruments to enhance our ability to manage risks that exist as part of our ongoing business operations and to enhance our return on Company assets. Derivative contracts are reflected as assets or liabilities in the balance sheet at their fair value. The estimated fair value of the derivatives is based on market and/or dealer quotations and in certain cases valuation modeling. From time to time we have entered into copper and zinc swap contracts to protect a fixed copper and zinc price for portions of our metal sales, hedging contracts to fix power prices for a portion of our production costs, interest rate swap agreements to hedge the interest rate risk exposure on certain of our bank obligations with variable interest rates, currency swap arrangements to ensure Mexican peso/ U.S. dollar conversion rates. Gains and losses related to copper and zinc hedges are included in net sales, gain and losses related to power costs are included in cost of sales, all other gains and losses on derivative contracts are included in “Gain (loss) on derivative contracts” in the consolidated statement of earnings.

Income Taxes: In preparing our consolidated financial statements, we recognize income taxes in each of the jurisdictions in which we operate. For each jurisdiction, we calculate the actual amount currently payable or receivable as well as deferred tax assets and liabilities attributable to temporary differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases. Deferred income tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which these temporary differences are expected to be recovered or settled. The effect on deferred tax assets and liabilities of a change in rate is recognized through the income tax provision in the period that the change is enacted.

A valuation allowance is provided for those deferred tax assets for which it is more likely than not that the related benefits will not be realized. In determining the amount of the valuation allowance, we consider estimated future taxable income as well as feasible tax planning strategies in each jurisdiction. If we determine that we will not realize all or a portion of our deferred tax assets, we will increase our valuation allowance with a charge to income tax expense. Conversely, if we determine that we will ultimately be able to realize all or a portion of the related benefits for which a valuation allowance has been provided, all or a portion of the related valuation allowance will be reduced with a credit to income tax expense.

Our Company’s operations involve dealing with uncertainties and judgments in the application of complex tax regulations in multiple jurisdictions. The final taxes paid are dependent upon many factors, including negotiations with taxing authorities in various jurisdictions and resolution of disputes arising from federal, state, and international tax audits. We recognize potential liabilities and record tax liabilities for anticipated tax audit issues in the U.S. and other tax jurisdictions based on our estimate of whether, and the extent to which, additional taxes will be due. As of January 1, 2007, we adopted FASB Interpretation No. 48, “Accounting for Uncertainty in Income Taxes,” (“FIN 48”), an interpretation of FASB Statement No. 109, “Accounting for Income Taxes,” guidance to record these liabilities (See Note 8 “Income Taxes” of the consolidated financial statements for additional information). We adjust these reserves in light of changing facts and circumstances; however, due to the complexity of some of these uncertainties, the ultimate resolution may result in a payment that is materially different from the Company’s current estimate of the tax liabilities. If our estimate of tax liabilities proves to be less than the ultimate assessment, an additional charge to expense would result. If payment of these amounts ultimately proves to be less than the recorded amounts, the reversal of the liabilities would result in tax benefits being recognized in the period when we determine the liabilities are no longer necessary. We recognize interest and penalties, if any, related to unrecognized tax benefits in income tax expense.

Asset Impairments: We evaluate our long-term assets when events or changes in economic circumstances indicate that the carrying amount of such assets may not be recoverable.

Our evaluations are based on business plans that are prepared using a time horizon that is reflective of our expectations of metal prices over our business cycle. We are currently using a long-term average copper price of $1.80 per pound of copper and an average molybdenum price of $12.00 per pound, along with near-term price forecast, for 2008 through 2010, reflective of the current price environment, for our impairment tests. We use an estimate of the future undiscounted net cash flows of the related asset or asset group over the remaining life to measure whether the assets are recoverable and measure any impairment by reference to fair value. Due to the illegal work stoppage we have performed an impairment analysis on the assets at the Cananea mine. We continue to provide periodic maintenance to the assets and expect to begin operations at this mine in the near future. We have determined through our impairment analysis that no impairment exists as of December 31, 2008. Should estimates of future copper and molybdenum prices decrease significantly, impairments could result.

#### Provisionally Priced Sales

The following are the provisionally priced copper and molybdenum sales outstanding at December 31, 2008, 2007 and 2006:

| Provisionally Priced Sales Copper | Year Ended December 31, 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Millions of pounds | 141.0 | 165.9 | 169.9 |
| Priced at average of (per pound) | $1.39 | $3.03 | $2.87 |
| Molybdenum |  |  |  |
| Millions of pounds | 6.3 | 4.7 | 7.3 |
| Priced at average of (per pound) | $9.50 | $32.38 | $24.50 |

Provisional sales adjustments included in accounts receivable and net sales at December 31, 2008, 2007 and 2006 were as follows:

*(dollars in millions)*

| Provisional Sales Adjustments | Year Ended December 31, 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Copper | $(44.2) | $(42.0) | $(47.3) |
| Molybdenum | (53.1) | — | (11.5) |
| Total | $(97.3) | $(42.0) | $(58.8) |

During the month of January 2009, the market price of copper increased and the price of molybdenum decreased slightly. The effect of these changes on 2008 sales settling in January 2009 was an increase of $1.1 million in sales. Additionally, forward prices for copper as of January 31, 2009 also increased, the effect of this increase on 2008 open sales settling after January 2009 would be an increase of $3.2 million in sales.

#### Results of Operations

The following table highlights key financial results for each of the years in the three-year period ended December 31, 2008.

*(dollars in millions)*

| Statement of Earnings Data | Year Ended December 31, 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Net sales | $4,850.8 | $6,085.7 | $5,460.2 |
| Cost of sales (exclusive of depreciation, amortization and depletion) | (2,182.2) | (2,122.2) | (2,019.8) |
| Selling, general and administrative | (102.4) | (98.0) | (88.3) |
| Depreciation, amortization and depletion | (327.3) | (327.9) | (275.1) |
| Exploration | (37.0) | (40.2) | (22.7) |
| Operating income | 2,201.9 | 3,497.4 | 3,054.3 |
| Interest expense | (105.9) | (123.2) | (113.4) |
| Interest capitalized | 6.8 | 14.7 | 27.9 |
| Interest income | 48.4 | 82.5 | 50.2 |
| Loss on debt prepayments | — | (16.6) | (1.1) |
| Loss on derivative instruments | (74.6) | (73.7) | (11.6) |
| Other income (expense) | 17.2 | 30.8 | (0.3) |
| Income taxes | (679.3) | (1,185.3) | (959.1) |
| Minority interest | (7.9) | (10.2) | (9.3) |
| Net earnings | $1,406.6 | $2,216.4 | $2,037.6 |

The table below outlines the average published market metals prices for our metals for each of the years ended December 31, 2008, 2007 and 2006:

### Average Market Metals Prices

|  | Year Ended December 31, 2008 | 2007 | 2006 | % Change 2007 to 2008 | 2006 to 2007 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Copper price ($ per pound - LME) | $3.16 | $3.23 | $3.05 | (2.2)% | 5.9% |
| Copper price ($ per pound - COMEX) | $3.13 | $3.22 | $3.09 | (2.8)% | 4.2% |
| Molybdenum price ($ per pound)(1) | $28.42 | $29.91 | $24.38 | (5.0)% | 22.7% |
| Zinc price ($ per pound - LME) | $0.85 | $1.47 | $1.49 | (42.2)% | (1.3)% |
| Silver price ($ per ounce - COMEX) | $14.97 | $13.39 | $11.54 | 11.8% | 16.0% |

(1) Platt’s Metals Week Dealer Oxide.

Segment Sales Information

The following table presents the volume of sales by segment of copper and our significant by-products, for each of the years in the three year period ended December 31, 2008:

| Copper Sales (million pounds) | Year Ended December 31, 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Peruvian operations | 793.7 | 863.4 | 860.9 |
| Mexican open-pit | 321.9 | 512.0 | 594.8 |
| Mexican IMMSA unit | 35.5 | 30.9 | 36.4 |
| Intersegment elimination | (36.6) | (75.8) | (105.9) |
| Total copper sales | 1,114.5 | 1,330.5 | 1,386.2 |

| By-product Sales (million pounds, except silver - million ounces) Peruvian operations: | Year Ended December 31, 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Molybdenum contained in concentrate | 20.3 | 21.9 | 20.6 |
| Zinc-refined and in concentrate (1) | 18.6 | 40.3 | 49.6 |
| Silver | 3.7 | 4.9 | 5.6 |
| Mexican open-pit operations: |  |  |  |
| Molybdenum contained in concentrate | 16.1 | 14.0 | 5.0 |
| Zinc-refined and in concentrate (1) | — | — | 15.5 |
| Silver | 4.5 | 3.6 | 4.5 |
| IMMSA unit |  |  |  |
| Zinc-refined and in concentrate | 220.7 | 250.6 | 273.1 |
| Silver | 8.9 | 10.7 | 12.0 |
| Intersegment elimination |  |  |  |
| Zinc | (18.2) | (39.1) | (57.1) |
| Silver | (2.1) | (0.9) | (2.3) |
| Total by-product sales |  |  |  |
| Molybdenum contained in concentrate | 36.4 | 35.9 | 25.6 |
| Zinc-refined and in concentrate | 221.1 | 251.8 | 281.1 |
| Silver | 15.0 | 18.3 | 19.8 |

(1) Through 2006, the Mexican open-pit operations purchased zinc products from IMMSA for resale to its customers. This practice was discontinued in 2006 and IMMSA’s zinc sales were either to their customers or to the Peruvian segment, who in turn resold to their customers.

**Results of Operations for the Year Ended December 31, 2008 Compared to Year Ended December 31, 2007.**

### Net sales

Net sales in 2008 were $4,850.8 million, compared with $6,085.7 million in 2007, a decrease of $1,234.9 million or 20.3%. The decrease was principally attributable to a decrease in sales volume of 16.2% and a decline in metal prices.

Copper sales volume decreased 16.2% in 2008 due to a 17.4% decrease in production principally due to the ongoing strike at the Cananea mine and lower ore grades at the Toquepala and La Caridad mines. In 2007, we also lost sales volume at Cananea due to a strike but to a lesser extent than in 2008. In addition, zinc and silver sales volume decreased as result of the strikes at some of our other Mexican operations.

The decline in metal prices began late in the third quarter of the year and continued through the fourth quarter. Copper was 2.8% and 2.2% lower in 2008, depending on whether it was COMEX or LME market, the molybdenum price was 5.0% lower and zinc prices were 42.2% lower. As a result of the decreasing copper and molybdenum prices, adjustments for provisionally priced sales reduced 2008 net sales by approximately $403.5 million. In 2008, approximately 60% of our copper and almost all of our molybdenum were sold under contracts that based the final sales price on months subsequent to shipment.

Net sales in 2008 also include a $137.0 million gain on copper derivatives compared with a gain of $10.9 million in 2007.

The table below presents information regarding the volume of our copper sales products.

| Copper Sales (million pounds) | Year Ended December 31, 2008 | 2007 |
| --- | ---: | ---: |
| Refined | 657.4 | 586.4 |
| Blister | 21.9 | 51.4 |
| Anode | 22.0 | 31.1 |
| Concentrates and other | 101.4 | 255.9 |
| SX/EW | 142.2 | 190.4 |
| Rod | 169.6 | 215.3 |
| **Total** | 1,114.5 | 1,330.5 |

Mine copper production was 1,077.9 million pounds in 2008, a decrease of 17.4% from 2007. This decrease of 227.6 million pounds included a reduction of 204.1 million pounds at our Mexican operations mainly due to strike related reductions at our Cananea and San Martin mines which were on strike almost all of 2008 and lower ore grade and PLS processed at the La Caridad mine. Additionally, production at our Peruvian mines decreased by 23.5 million pounds mainly due to lower ore grades and recoveries at the Toquepala mine.

Molybdenum production and sales volume increased 1.1% and 1.3%, respectively in 2008 when compared to 2007. The increases are principally due to higher grades from La Caridad mine.

Mine zinc production amounted to 235.7 million pounds in 2008, an 11.6% decrease from 2007. The decrease of 31.1 million pounds in zinc production is mainly due to the strike losses at our Taxco and San Martin mines.

Copper made up 69.2% of net sales in 2008 compared with 69.5% in 2007. Sales of by-products in 2008 totaled $1,495.9 million compared with $1,856.9 million in 2007, a decrease of 19.4%. The decrease is principally attributable to the decrease in the sales prices for molybdenum as well as decrease in sales volume and prices for zinc. The table below provides the sales of our by-products as a percentage of our total net sales.

| By-product Sales as a Percentage of Total Net Sales | Year Ended December 31, 2008 | 2007 |
| --- | ---: | ---: |
| Molybdenum | 16.5% | 17.8% |
| Zinc | 4.0% | 6.0% |
| Silver | 4.3% | 3.8% |
| Other by-products | 6.0% | 2.9% |
| **Total** | 30.8% | 30.5% |

90

### Cost of sales (exclusive of depreciation, amortization and depletion)

Our cost of sales (exclusive of depreciation, amortization and depletion) in 2008 was $2,182.2 million, compared with $2,122.2 million in 2007, an increase of $60.0 million, or 2.8%. The increase in cost of sales was principally due to 1) $152.7 million of higher production cost, including, $113.2 million of higher fuel and power cost and $37.1 million of higher labor costs mainly in our Peruvian operations due to new labor agreements and the appreciation of the nuevo sol, and 2) $56.5 million of higher concentrates purchased from third parties to cover the loss of production at our Mexican mines. These increases were partially offset by 1) $98.8 million of lower workers participation, 2) $13.2 million of lower mining royalties both due to the decrease in revenues as a result of lower metal prices and 3) $29.8 million of gain in currency translation mainly due to the depreciation of the Mexican peso.

### Selling, general and administrative

Our selling, general and administrative expense in 2008 was $102.4 million, compared with $98.0 million in 2007, an increase of $4.4 million. The increase was principally due to higher labor costs of $1.8 million, $1.5 million of higher legal and consulting services and $1.2 million of higher software and license fees.

### Exploration

We maintain active exploration programs in Peru, Mexico and Chile. Exploration expense in 2008 was $37.0 million and included $20.4 million in Peru (including Chile) and $16.6 million in Mexico, compared with $40.2 million in 2007, of which $25.4 million was in Peru (including Chile) and $14.8 million in Mexico.

Exploration expense at Tia Maria decreased from $8.9 million in 2007 to $4.6 million in 2008. The spending in 2007 was high because it included the Tia Maria feasibility study. In 2008, Tia Maria entered the development stage as an economic project, please see “Capital expansion program”, under this Item 7. Also in Peru, exploration spending on the Los Chancas project increased to $3.2 million in 2008 from $0.9 million in 2007, as we increased our spending on drilling and field work in 2008. Additionally, in 2007 we spent $7.0 million on other feasibility studies, compared to $3.2 million in 2008.

Exploration spending in Mexico was $16.6 million in 2008, as compared to $14.8 in 2007. Major spending in 2008 included drilling and field work at the Charcas and Santa Eulalia mines in our IMMSA unit.

### Interest expense

Interest expense in 2008 was $105.9 million compared with $123.2 million in 2007, a decrease of $17.3 million. Interest expense decreased in 2008 as a result of a decrease in our average debt outstanding, mainly due to the payment in April 2008 of $150 million of Series A of our Yankee bonds. Please see “Liquidity and Capital Resources” for a further discussion of our financing program.

### Capitalized interest

Capitalized interest in 2008 was $6.8 million, compared with $14.7 million in 2007, a decrease of $7.9 million. This decrease is mainly due to the startup of the Ilo smelter modernization project in early 2007 and the start up of the new PLS dump project at Toquepala in late 2007. Capitalized interest for these two projects was $3.2 million lower in 2008. Capitalized interest in our Mexican operations decreased by $4.7 million in 2008 due to payment of our Yankee bonds.

### Interest income

Interest income in 2008 was $48.4 million, compared with $82.5 million in 2007, a decrease of $34.1 million. Our interest income decreased principally as a result of lower interest rates on cash investments in 2008 and lower average invested balances.

### Loss on debt prepayments

Loss on debt prepayments in 2007 was $16.6 million. This loss was related to the repurchase of $68.6 million of Series B of our Yankee bonds. We did not prepay any debt in 2008.

### Loss on derivative instruments

Loss on derivative instruments in 2008 was $74.6 million compared with $73.7 million in 2007. Gain or losses on copper and other metal derivatives are included in net sales and gain or losses on gas derivatives are included in the cost of sales on the consolidated statement of earnings. The loss on derivative instruments in 2008 and 2007 includes the following (in millions):

|  | 2008 | 2007 |
| --- | ---: | ---: |
| Gain (loss) on US dollar/ Mexican peso exchange rate derivatives | $(74.6) | $8.6 |
| Loss on embedded derivatives in short-term investments | — | (81.0) |
| Loss on dual currency notes | — | (1.3) |
| Total | $(74.6) | $(73.7) |

The $74.6 million loss on US dollar/ Mexican peso exchange rate in 2008 was result of the devaluation of the Mexican peso late in 2008. The Mexican peso devalued 24.5% in 2008 compared to an appreciation of 0.1% in 2007. In 2007 we held short-term investment instruments which were indexed to SCC common stock prices and other instruments leveraged and indexed to certain bond pools. These instruments were not principal protected and were deemed to contain embedded derivatives. Related to these embedded derivatives we lost $81.0 million in 2007 which was recorded as “Loss on derivative instruments” in the consolidated statement of earnings. The total amount of these investment instruments were liquidated during the course of 2007. We did not hold these types of instruments in 2008.

For a further discussion please see Note 16 Derivative instruments to our consolidated financial statements.

### Other income (expense)

Other income (expense) in 2008 was $17.2 million compared to $30.8 million in 2007. The decrease of $13.6 million in income was attributable to $8.8 million of lower income in our Peruvian operations and $4.8 million in our Mexican operations. The decrease in income in our Peruvian operation was mainly due to a $10.3 million loss on a mark to market valuation of short-term investments, net of an increase in income of $1.5 million on miscellaneous sales. The decrease in income in our Mexican operation was mainly due to a loss of $12.4 million on the sale of investments, net of $3.9 million of tax recoveries, other than income tax. Also 2008 includes a $2.6 million loss on asset disposals.

### Income taxes

Income taxes in 2008 were $679.3 million and include $724.3 million of Peruvian and Mexican income taxes and a benefit of $45.0 million for U.S. Federal and state income taxes. Income taxes in 2007 were $1,185.3 million and include $1.153.9 million of Peruvian and Mexican income taxes and $31.5 million for U.S. Federal and state income taxes. US income taxes are primarily attributable to investment income and limitations placed on the use of available tax credits (both foreign tax credits and the minimum tax credit).

The decrease of $506.1 million or 42.7% was primarily due to $1,318.1 million of lower pretax income. The effective tax rate for 2008 was 32.5%, compared with 34.8% in 2007. The decrease in the effective tax rate is largely due to the decrease in unrecognized tax benefits for uncertain tax positions due to a settlement with the IRS. Please see note 8 “Income Taxes” for further discussion of the settlement.

### Minority interest

Minority interest in 2008 was $7.9 million compared with $10.2 million in 2007, a decrease of $2.3 million or 23.1%. This decrease is the result of lower earnings in our Peruvian operations.

### Net earnings

Our net earnings in 2008 were $1,406.6 million, compared with $2,216.4 million in 2007, a decrease of $809.8 million or 36.5%. Net earnings decreased as a result of the factors described above.

### Segment Operating Income Information — 2008 vs.2007:

### Peruvian Open-pit Operations

|  | 2008 | 2007 | Change Value% |  |
| --- | ---: | ---: | ---: | ---: |
| Net sales | $2,943.2 | $3,512.9 | $(569.7) | (16.2) |
| Operating costs and expenses | (1,418.4) | (1,541.2) | 122.8 | (8.0) |
| Operating income | $1,524.8 | $1,971.7 | $(446.9) | (22.7) |

Net sales at our Peruvian operations in 2008 were $2,943.2 million, compared with $3,512.9 million in 2007, a decrease of $569.7 million. This decrease was principally due to the price decline of copper and molybdenum late in 2008. While the LME copper price was 2.2% lower in 2008 (the majority of copper sales of our Peruvian operation are priced on the LME) and the molybdenum price was 5.0% lower. The reduction to sales was magnified, since the prices of the metals dropped sharply in the fourth quarter of 2008. This occurred since much of our sales of copper and molybdenum take final pricing in months subsequent to shipment. The effect of provisional price adjustments in the fourth quarter of 2008 reduced sales by $330.3 million.

Additionally, in 2008 copper, molybdenum and silver sales volume decreased by 69.7 million pounds, 1.6 million pounds and 1.2 million ounces, respectively. The decrease in copper sales was mainly due to lower rod sales by our trading subsidiary. These sales were less due to less material being available from our Mexican operations as a result of the Cananea strike. The decrease in molybdenum sales volume was due to lower production mainly from the Toquepala mine due to lower ore grade. Net sales in 2008 also include a gain on copper derivatives of $91.8 million compared with a gain of $5.5 million in 2007.

Operating costs and expenses at our Peruvian operations in 2008 were $1,418.4 million, compared with $1,541.2 in 2007, a decrease of $122.8 million principally due to lower cost of sales (exclusive of depreciation, amortization and depletion). Cost of sales (exclusive of depreciation, amortization and depletion) was $1,243.1 million in 2008, compared with $1,365.2 million in 2007. The decrease of $122.1 million was principally the result of 1) $104.6 million of lower copper concentrates purchased from third parties, 2) $153.0 million of lower metal purchased from our Mexican operations due to the strike at Cananea, 3) $17.1 million of lower workers participation due to lower earnings, 4) $16.5 million of lower sales expenses due to changes in product mix sales and 5) $8.9 million of lower mining royalties due to lower metal prices. These decreases were partially offset by $192.6 million of higher production cost mainly due to $118.0 million of higher fuel and power cost due to higher market prices and $62.3 million of higher labor cost due to new labor agreements and the appreciation of the Peruvian nuevo sol during part of the year.

Operating income in 2008 was $1,524.8 million, compared with $1,971.7 million in 2007, a decrease of $446.9 million. The operating income increased as a result of the factors described above.

### Mexican Open-pit Operations.

|  | 2008 | 2007 | Change Value% |  |
| --- | ---: | ---: | ---: | ---: |
| Net sales | $1,583.6 | $2,225.1 | $(641.5) | 28.8 |
| Operating costs and expenses | (949.5) | (954.4) | 4.9 | 0.5 |
| Operating income | $634.1 | $1,270.7 | $(636.6) | 50.1 |

Net sales at our Mexican open-pit operations in 2008 were $1,583.6 million, compared with $2,225.1 million in 2007, a decrease of $641.5 million or 28.8%. This decrease is result of lower metal prices and lower copper sales volume, mainly refined and rod, due to the loss of production as a result of the ongoing strike activity at the Cananea mine. While the COMEX copper price was 2.8% lower in 2008 (the majority of copper sales of our Mexican operations are priced on COMEX) and the molybdenum price was 5.0% lower, the effect of provisional price adjustments in the fourth quarter of 2008 reduced sales by $76.4 million. Partially offsetting this reduction, net sales in 2008 included a gain on copper derivatives of $45.2 million compared with a gain of $5.5 million in 2007.

Operating cost and expenses at our Mexican open-pit operations in 2008 was $949.5 million compared with $954.4 million in 2007, a decrease of $4.9 million. This decrease was the result of lower cost of sales (exclusive of depreciation, amortization and depletion) in 2008 of $7.7 million, partially offset by $1.4 million of higher depreciation amortization and depletion due to higher amortization of capitalized leach material and $0.9 million of higher selling, general and administrative expenses. The decrease in cost of sales (exclusive of depreciation, amortization and depletion) was principally the effect of the ongoing strike at the Cananea mine and is explained by 1) $56.4 million of lower production cost, 2) $62.0 million of lower workers’ participation, 3) $17.6 million of lower inventory consumption partially offset by 4) $99.0 million of higher metals purchased from third parties, 5) $28.0 million of continuing cost at Cananea mine and 6) $14.0 million of severance payments.

Operating income in 2008 was $634.1 million, compared with $1,270.7 million in 2007, a decrease of $636.6 million or 50.1%. The operating income increased as a result of the factors described above.

**IMMSA Unit.**

|  | 2008 | 2007 | Change Value% |  |
| --- | ---: | ---: | ---: | ---: |
| Net sales | $525.1 | $680.7 | $(155.6) | 22.9 |
| Operating costs and expenses | (511.7) | (434.3) | (77.4) | 17.8 |
| Operating income | $13.4 | $246.4 | $(233.0) | 94.6 |

Net sales at our IMMSA unit in 2008 were $525.1 million, compared with $680.7 million in 2007, a decrease of $155.6 million or 22.9%. The decrease in 2008 was principally due to lower sales volume caused by strikes at the Taxco and San Martin mines and lower zinc prices.

Operating costs and expenses at our IMMSA unit were $511.7 million in 2008, compared with $434.3 million in 2007, an increase of $77.4 million or 17.8%. This increase was principally the result of $84.7 million of higher cost of sales (exclusive of depreciation, amortization and depletion) partially offset by $4.9 million of lower depreciation, amortization and depletion, the effect of the accelerated depreciation taken in 2007 on the processing plant equipment at Pasta de Conchos as a result of the mine accident and $3.7 million of lower selling, general and administrative expenses due to lower consultant and support services. The increase in cost of sales (exclusive of depreciation, amortization and depletion) was principally the result of 1) $82.4 million of higher metal purchased from third parties to partially cover the production loss due to the strikes, 2) $38.0 million of loss in currency translation due to the depreciation of the Mexican peso against the US dollar, 3) $9.1 million of higher fuel and power cost due to increased market prices, 4) $8.6 million of higher drilling and field work at the Charcas and Santa Eulalia mines and 5) $11.4 million of contractor services for operations due to higher production of coal and coke in Nueva Rosita south pit. These increases were partially offset by 1) $21.2 million of lower workers participation, 2) $15.0 million for an insurance reimbursement for the zinc refinery fire in 2007, 3) $13.1 million of use of inventory and 4) $8.1 million of lower tolling cost due to termination of the contract in May 2008.

Operating income in 2008 was $13.4 million, compared with $246.4 million in 2007, a decrease of $233.0 million or 94.6%. The operating income decreased as a result of the factors described above.

#### Intersegment Eliminations and Adjustments

The net sales, operating costs and expenses and operating income discussed above will not be directly equal to amounts in our consolidated statement of earnings because the adjustments of intersegment operating revenues and expenses must be taken into account. Please see Note 20 of our consolidated financial statements.

**Results of Operations for the Year Ended December 31, 2007 Compared to Year Ended December 31, 2006.**

### Net sales

Our sales in 2007 were $6,085.7 million, compared with $5,460.2 million in 2006, an increase of $625.5 million or 11.5%. The increase was attributable to higher market prices for most of our products. Copper was 4.2% to 5.9% higher in 2007, depending on whether it was COMEX or LME market, the molybdenum price was 22.7% higher and silver was 16% higher. Zinc prices decreased by 1.3% in 2007. In addition, molybdenum sales volume increased 40.2% in 2007 due to higher grades at our Peruvian mines and increased production from the La Caridad mine which had strike losses in 2006. 2007 net sales also include a $10.9 million gain on copper derivatives compared with a loss of $276.1 million in 2006. There was, however, a decrease in copper sales volume in 2007 due to a strike at the Cananea mine.

Sales volume for copper decreased by 55.7 million pounds in 2007 a decrease of 4% compared with 2006. The impact of this decrease in copper sales volume, as well as a volume decrease in the sale of zinc and silver was a result of the strikes at some of our Mexican operations. However, during this year there was an increase in the volume of molybdenum sales.

The table below presents information regarding the volume of our copper sales products.

| Copper Sales (million pounds) | Year Ended December 31, 2007 | 2006 |
| --- | ---: | ---: |
| Refined | 586.4 | 835.0 |
| Blister | 51.4 | 43.9 |
| Anode | 31.1 | 29.9 |
| Concentrates | 255.9 | 56.0 |
| SX/EW | 190.4 | 210.9 |
| Rod | 215.3 | 210.5 |
| **Total** | 1,330.5 | 1,386.2 |

Mine copper production was 1,305.5 million pounds in 2007, a decrease of 2.2% from 2006. This decrease of 29.7 million pounds included a reduction of 24.6 million pounds at our Mexican operations due to strike related reductions at our Cananea and San Martin mines where strikes began on July 30, 2007 and ran through the end of the year. Additionally, production at our Peruvian mines decreased by 5.1 million pounds mainly due to lower ore grade at the Toquepala mine. The make up of our 2007 copper sales changed significantly from 2006, as we sold about 200 million additional pounds of copper in concentrate form and about 250 million pounds less of refined copper. This change was caused principally by some delays in reaching full capacity at our modernized Ilo smelter.

Molybdenum production and sales increased 36.8% and 40.2%, respectively in 2007 when compared to 2006. The increases are principally due to higher grades at our Peruvian mines and from La Caridad mine which lost production in 2006 due to strikes.

Mine zinc production amounted to 266.8 million pounds in 2007, a 11.4% decrease from 2006. The decrease of 34.3 million pounds in zinc production is mainly due to the strike losses at our Taxco and San Martin mines.

Copper made up 69.5% of net sales in 2007 compared with 76.0% in 2006. Sales of by-products in 2007 totaled $1,856.9 million compared with $1,313.1 million in 2006, an increase of 41.4%. The increase is principally attributable to the increase in the volume and sales prices for molybdenum. This increase was partially reduced by lower volume and sales prices for zinc. The table below provides the sales of our by-products as a percentage of our total net sales.

| By-product Sales as a Percentage of Total Net Sales | Year Ended December 31, 2007 | 2006 |
| --- | ---: | ---: |
| Molybdenum | 17.8% | 10.5% |
| Zinc | 6.0% | 7.1% |
| Silver | 3.8% | 4.1% |
| Other by-products | 2.9% | 2.3% |
| **Total** | 30.5% | 24.0% |

96

### Cost of sales (exclusive of depreciation, amortization and depletion)

Our cost of sales (exclusive of depreciation, amortization and depletion) in 2007 was $2,122.2 million, compared with $2,019.8 million in 2006, an increase of $102.4 million, or 5.1%. The increase in cost of sales was principally due to $132.0 million of higher production cost, including, $21.7 million due to higher fuel and power cost, $15.5 million of higher water cost at our Mexican operations due to an increase in the water rate applicable to the mining industry, $14.8 million of higher labor costs, $24.9 million of higher repair costs, and $55.1 million of other operating costs offset by $146.8 million of lower metal purchased from third parties. The increase in cost of sales also includes $32.3 million of higher freight and selling cost mainly due to higher sale of concentrates, $27.1 million of inventory consumption and $39.4 million of higher workers participation.

### Selling, general and administrative

Our selling, general and administrative expense in 2007 was $98.0 million, compared with $88.3 million in 2006, an increase of $9.7 million. The increase was principally due to higher labor costs of $6.4 million and $2.5 million of higher rental equipment and office maintenance cost at our Mexican corporate office.

### Depreciation, amortization and depletion

Depreciation, amortization and depletion was $327.9 million in 2007 compared with $275.1 million in 2006, an increase of $52.8 million over 2006. The increase includes additional charges of $24.4 million at our Peruvian operations, of which $21.7 million was for our newly activated Ilo smelter modernization project. Increases in depreciation, amortization and depletion in 2007 at our Mexican operations amounted to $28.5 million. This increase includes $11.4 million of higher amortization of capitalized leach material due to increased amounts capitalized in 2006, $8.9 million of accelerated depreciation of the processing plant equipment at Pasta de Conchos over the remaining mineral located in the open pit after the mine accident and $8.2 million due to the activation of maintenance and replacement equipment.

### Exploration

Exploration expense in 2007 was $40.2 million compared with $22.7 million in 2006, an increase of $17.5 million over 2006. This increase includes $11.8 million at our Peruvian operations, and was principally for the Tia Maria project in the department of Arequipa, where spending increased by $9.2 million. A feasibility study for the project was completed in 2007 and we are planning to begin the project in 2008. Exploration expense at our Mexican operation increased by $5.7 million in 2007 and was principally for the surface drilling activity at Santa Barbara, San Martin and Santa Eulalia.

### Interest expense

Interest expense in 2007 was $123.2 million compared with $113.4 million in 2006, an increase of $9.8 million. Interest expense increased in 2007 principally as a result of an increase in our average debt outstanding. Please see “Liquidity and Capital Resources” for a further discussion of our financing program.

### Capitalized interest

Capitalized interest in 2007 was $14.7 million, compared with $27.9 million in 2006, a decrease of $13.2 million. This decrease is largely due to the startup of the Ilo smelter modernization project in early 2007, for which we capitalized $14.0 million less interest in 2007.

### Interest income

Interest income in 2007 was $82.5 million, compared with $50.2 million in 2006, an increase of $32.3 million. Our interest income increased principally as a result of higher interest rates on short term securities and higher invested balances.

### Loss on debt prepayments

Loss on debt prepayments in 2007 was $16.6 million, compared with $1.1 million in 2006, an increase of $15.5 million. Losses in both periods are related to the repurchase of our Mexican Yankee bonds.

### Loss on derivative instruments

Loss on derivative instruments in 2007 was $73.7 million, compared with a loss of $11.6 million in 2006. Gain or losses on copper and other metal derivatives are included in the net sales line and gain or losses on gas derivatives are included in the cost of sales line of the consolidated statement of earnings. The loss on derivative instruments in 2007 and 2006 includes $81.0 million and $11.6 million of loss on the embedded derivatives on short-term investment, respectively. Also the 2007 loss on derivative instruments includes $1.3 million of loss on dual currency notes and gain of $8.6 million in exchange rate derivatives US dollar/Mexican peso. For a further discussion please see Note 3 Short-term Investments and Note 16 Derivative Instruments to our Audited Consolidated Financial Statements.

### Other income (expense)

Other income in 2007 was $30.8 million, compared with an expense of $0.3 million in 2006. The increase in income is primarily attributable to $12.4 million of gain on the sale of an inactive Mexican subsidiary, $3.0 million of lower cost of disposal of assets, and $10.5 million of lower miscellaneous expenses.

### Income taxes

Income taxes in 2007 were $1,185.3 million and include $1.153.8 million of Peruvian and Mexican income taxes and $31.5 million for U.S. Federal and state income taxes. Income taxes in 2006 were $959.1 million and included $940.3 million of Peruvian and Mexican income taxes and $18.8 million for U.S. Federal and state income taxes. US income taxes are primarily attributable to investment income and limitations placed on the use of available tax credits (both foreign tax credits and the minimum tax credit).

The increase of $226.2 million or 23.6% was primarily due to $405.8 million of higher pretax income. The effective tax rate for 2007 was 34.7%, compared with 31.9% in 2006. The increase in the effective tax rate is largely due to the incremental U.S. tax on dividend income. The dividend income eliminates in financial consolidation (book income) but it is taxable in the U.S. at the difference between the 35% U.S. statutory rate and the foreign tax credit rate of 28% on the dividend.

### Minority interest

Minority interest in 2007 was $10.2 million compared with $9.3 million in 2006, an increase of $0.9 million or 10.0%. This increase is the result of higher earnings.

### Net earnings

Our net earnings in 2007 were $2,216.4 million, compared with $2,037.6 million in 2006, an increase of $178.8 million or 8.8%. Net earnings increased as a result of the factors described above.

### Segment Operating Income Information — 2007 vs.2006:

### Peruvian Open-pit Operations

|  | 2007 | 2006 | Change Value% |  |
| --- | ---: | ---: | ---: | ---: |
| Net sales | $3,512.9 | $3,215.4 | $297.5 | 9.3% |
| Operating costs and expenses | (1,541.4) | (1,383.4) | (158.0) | 11.4% |
| Operating income | $1,971.5 | $1,832.0 | $139.5 | 7.6% |

Net sales at our Peruvian operations in 2007 were $3,512.9 million, compared with $3,215.4 million in 2006, an increase of $297.5 million. This increase was principally due to increases in the sales price of copper and molybdenum. The LME copper price was 5.9% higher in 2007 (the majority of sales of our Peruvian operations’ copper is priced on LME) and the molybdenum price was 22.7% higher. Additionally in 2007 copper and molybdenum sales volume increased by 2.5 million pounds and 1.3 million pounds, respectively. Net sales in 2007 include a gain on copper derivatives of $5.5 million compared with a loss of $162.3 million in 2006.

Operating costs and expenses at our Peruvian operations in 2007 were $1,541.4 million, compared with $1,383.4 in 2006, an increase of $158.0 million principally due to higher cost of sales and higher depreciation, amortization and depletion. The increase in cost of sales (exclusive of depreciation, amortization and depletion) of $117.8 million was principally the result of higher labor cost of $26.6 million due to an increase in salaries and an exchange rate effect, $9.6 million of higher fuel and power cost, $37.4 million of higher freight and selling cost mainly due to the sale of concentrates and $16.8 million of inventory consumption. The increase in depreciation, amortization of depletion of $24.4 million is mainly due to the newly activated Ilo smelter modernization project which represents an additional charge of $21.7 million.

Operating income in 2007 was $1,971.5 million, compared with $1,832.0 million in 2006, an increase of $139.5 million. The operating income increased as a result of the factors described above.

### Mexican Open-pit Operations

|  | 2007 | 2006 | Change Value% |  |
| --- | ---: | ---: | ---: | ---: |
| Net sales | $2,225.1 | $1,987.1 | $238.0 | 12.0% |
| Operating costs and expenses | (954.4) | (1,067.3) | 112.9 | 10.6% |
| Operating income | $1,270.7 | $919.8 | $350.9 | 38.1% |

Net sales from our Mexican open-pit operations in 2007 were $2,225.1 million, compared with $1,987.1 million in 2006, an increase of $238.0 million or 12.0%. This improvement is the result of the higher molybdenum volume, produced and sold in 2007 and the higher sales price for the molybdenum. Sales of molybdenum, produced by our La Caridad mine increased from 5.5 million pounds in 2006 to 13.6 million pounds in 2007. Significant production and sales of molybdenum were lost in 2006 as La Caridad had a lengthy strike in the first half of the year. This increase, from molybdenum sales, was reduced by the decrease in volume of copper sales, due principally to a strike at the Cananea mine. In addition, net sales in 2007 included a gain on copper derivatives of $5.5 million compared with a loss of $113.9 million in 2006.

Operating costs and expenses at our Mexican open-pit operations in 2007 were $954.4 million compared with $1,067.3 million in 2006, a decrease of $112.9 million or 10.6%. This decrease was principally the result of lower cost of sales net of higher depreciation, amortization and depletion. The decrease in cost of sales (exclusive of depreciation, amortization and depletion) of $131.9 million was principally the effect of the Cananea strike, which began on July 30, 2007 and continued through the end of 2007. An increase in depreciation, amortization and depletion of $16.6 million in 2006 was principally due to higher amortization of capitalized leach material due to increased amounts capitalized in 2006.

Operating income in 2007 was $1,270.7 million, compared with $919.8 million in 2006, an increase of $350.9 million or 38.1%. The operating income increased as a result of the factors described above.

### IMMSA Unit

|  | 2007 | 2006 | Change Value% |  |
| --- | ---: | ---: | ---: | ---: |
| Net sales | $680.7 | $702.5 | $(21.8) | (3.1%) |
| Operating costs and expenses | (434.3) | (405.2) | (29.1) | 7.2% |
| Operating income | $246.4 | $297.3 | $(50.9) | (17.1%) |

Net sales at our IMMSA unit in 2007 were $680.7 million, compared with $702.5 million in 2006, a decrease of $21.8 million or 3.1%. The decrease was principally due to lower sales volume caused by strikes at the Taxco and San Martin mines and lower zinc prices partially offset by higher sales prices in 2007 for copper and silver. Net sales in 2006 include a loss on zinc derivatives of $0.2 million.

Operating costs and expenses at our IMMSA unit were $434.3 million in 2007, compared with $405.2 million in 2006, an increase of $29.1 million or 7.2%. This increase was principally the result of higher cost of sales (exclusive of depreciation, amortization and depletion) and higher depreciation, amortization and depletion. The increase in cost of sales (exclusive of depreciation, amortization and depletion) of $15.8 million, was principally the result of $12.0 million of higher fuel and power cost, $1.7 million of higher water cost due to increase in water rates and $3.2 million of other operating cost. These increases were partially offset by $0.9 million of lower metal purchased from third parties. The increase in depreciation, amortization and depletion of $9.1 million is mainly due to the accelerated depreciation of the processing plant equipment at Pasta de Conchos over the remaining mineral located in the open pit after the mine accident.

Operating income in 2007 was $246.4 million, compared with $297.3 million in 2006, a decrease of $50.9 million or 17.1%. The operating income decreased as a result of the factors described above.

#### Intersegment Eliminations and Adjustments

The net sales, operating costs and expenses and operating income discussed above will not be directly equal to amounts in our consolidated statement of earnings because the adjustments of intersegment operating revenues and expenses must be taken into account. Please see Note 20 of our consolidated financial statements.

### Liquidity and Capital Resources

The following discussion relates to our liquidity and capital resources for each of the years in the three year period ended December 31, 2008.

### Liquidity

*(in millions)*

|  | Year Ended December 31, 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Net cash provided from operating activities | $1,720.6 | $2,703.5 | $2,059.3 |
| Net cash used for investing activities | (410.9) | (246.0) | (725.3) |
| Net cash used for financing activities | (2,048.0) | (2,088.3) | (1,164.3) |

### Cash Flows from Operating Activities

Net cash provided from operating activities was $1,720.6 million, $2,703.5 million and $2,059.4 million in 2008, 2007 and 2006, respectively. The decrease in 2008 was primarily the result of lower net earnings as a result of lower sales prices for most of our metal products and a decrease in sales volume. The increase in 2007 was primarily the result of higher net earnings, which was the result of improved sales prices for most of our metal products and the change in the balances of operating assets and liabilities. Also in 2007, an increase in molybdenum sales volume contributed to the increase in cash flow.

In 2008, our earnings were $1,406.6 million, approximately 81.8% of the net operating cash flow. Significant items deducted from, or added to arrive to operating cash flow included depreciation, amortization and depletion of $327.3 million and $56.8 million of unrealized loss on derivative instruments which positively increased operating cash flow and $100.1 million of a deferred income tax benefit, $30.0 million for a gain on the sale of inactive properties in our Mexican operations and $18.1 million of gain on currency translation which lowered our cash flow. Additionally in 2008, a decrease in working capital needs increased operating cash flow by $61.9 million.

The contribution from working capital includes (in millions):

|  |  |
| --- | ---: |
| Accounts receivable | $330.2 |
| Inventories | (3.3) |
| Accounts payable and accrued liabilities | (164.3) |
| Other operating assets and liabilities | (100.7) |
| Total | $61.9 |

The cash flow generated by the reduction in accounts receivable was primarily caused by the sharp decrease in metal prices at the end of 2008. The fourth quarter 2008 price of copper and molybdenum was approximately 46% and 55% lower than the fourth quarter of 2007. In addition, the year-end 2008 price of copper and molybdenum was approximately 55% and 70% lower than the year-end 2007 prices. Accounts payable and accrued liabilities decreased by $164.3 million in 2008, largely as a result of a decrease in workers’ participation and income tax accruals of $107.8 million and $97.8 million, respectively, as a result of lower earnings in 2008. Other operating assets and liabilities in 2008 were a use of cash of $100.7 million which was caused principally by a decrease of $84.5 million in FIN 48 provision, see Note 8 — “Income Taxes”, of our consolidated financial statements.

In 2007, our earnings were $2,216.4 million, approximately 82.0% of the net operating cash flow. Significant items deducted from, or added to arrive to operating cash flow included, depreciation amortization and depletion of $327.9 million, $81.0 million of realized loss on short-term investments and $66.6 million of deferred income tax, which positively increased operating cash flow and $45.9 million of capitalized leachable material, which lowered our cash flow. Additionally, a decrease in working capital needs increased operating cash flow by $34.9 million.

The 2007 contribution from working capital includes (in millions):

|  |  |
| --- | ---: |
| Accounts receivable | $66.2 |
| Inventories | (34.6) |
| Accounts payable and accrued liabilities | (150.3) |
| Other operating assets and liabilities | 153.6 |
| Total | $34.9 |

The cash flow generated by the reduction in accounts receivable was primarily caused by a timing difference in sales. The increase in inventory of $34.6 million was due to a temporary increase of supplies inventory due to the strikes at our Mexican operations partially offset by a decrease in metal inventory due to the decrease in production. Accounts payable and accrued liabilities decreased by $150.3 million. Other operating assets and liabilities in 2007 was a use of cash of $153.6 million.

In 2006, our earnings were $2,037.6 million, approximately 98.9% of the net operating cash flow. Significant items deducted from, or added to, our earnings to arrive to operating cash flow included, depreciation, amortization and depletion of $275.1 million, and $11.6 million of unrealized loss on short-term investment, which positively increased operating cash flow and capitalized leachable material of $65.9 million, which lowered our cash flow. Additionally, an increase in working capital reduced operating cash flow by $178.5 million. The working capital increase was the result of an increase of $217.9 million of receivables as a result of higher copper prices, this increase was reduced by a buildup of $80.7 million of accounts payable and accrued liabilities, a key component of which was the increase of $104.3 million in the unpaid provision for workers’ participation, which was paid in the first quarter of 2007. Other increases in working capital amounted to $41.3 million.

### Cash Flows from Investing Activities

Net cash used for investing activities was $410.9 million in 2008 compared to $246.0 million in 2007. In 2008 investing activities include $516.7 million of capital expenditures, $45.2 million received from the redemption of short-term investments and $60.6 million of proceeds from the sale of inactive properties in our Mexican operations.

The $516.7 million of capital expenditures includes the following expenditures at our Peruvian operations, $118.0 million for the Tia Maria project, $37.7 million for the Toquepala expansion project, $18.2 million for the Cuajone expansion project, $21.7 million for the tailing disposal project, $17.3 million for electrical shovels and $89.5 for equipment replacement and upgrades. Capital expenditures also include equipment replacement and upgrade of $145.0 million at Mexican our open pit operations, $44.2 million in our IMMSA unit and $25.1 million for our administrative office in Mexico.

Net cash used for investing activities was $246.0 million in 2007 compared to $725.3 million in 2006. In 2007, investing activities include $315.7 million of capital expenditures, $217.9 million for the purchase of short-term investments, less $287.4 million received on the redemption of short-term investments. The $315.7 million of capital expenditures, includes $21.0 million for the Ilo smelter modernization project, $13.8 million for the Toquepala leach dump project, $10.5 million for the PLS dam project and $270.4 million for equipment replacements and upgrades of which $188.6 million was for our Mexican operations.

Net cash used for investing activities was $725.3 million in 2006. In 2006, investing activities include $455.8 million of capital expenditures, and short-term investments of $280.0 million. The $455.8 million of capital expenditures includes $160.9 million for the Ilo smelter modernization project, $15.6 million for the Toquepala leach dump project and $279.3 million principally for equipment replacements and upgrades, of which $202.5 million was for our Mexican operations.

### Cash Flows from Financing Activities

For 2008, cash used for financing activities amounted to $2,048.0 million, and included a shareholder dividend distribution of $1,710.8 million, a distribution to minority interest investors of $10.2 million, $384.7 million for the repurchase of 28.5 million shares of our common stock and $160.0 million of debt repayment. In addition, we received $216.4 million from the sale of 350 million shares of our parent company’s common stock. See Note 15 “Stockholder Equity”.

For 2007, cash used for financing activities amounted $2,088.3 million, mainly for a dividend distribution of $2,002.3 million to our shareholders and $7.2 million to our remaining minority interest investors. In 2007, financing activities also include $68.6 million for the repurchase of our Yankee bonds series B and $10.0 million for the amortization of the Mitsui loan.

For 2006, cash used for financing activities amounted to $1,164.3 million, mainly for a dividend distribution of $1,509.1 million to our shareholders and $8.3 million to our remaining minority interest investors. In addition, net debt incurred in 2007 was $356.0 million.

### Other Liquidity Considerations

In 2008, the Company’s Board of Directors authorized an up to $500 million share repurchase program. Under this program we may purchase shares from time to time, based on market conditions and other factors. The repurchase program has no expiration date and may be modified or discontinued at any time. The shares acquired will be available for general corporate purposes. During 2008 we repurchased 28.5 million shares at an average cost of $13.49 totaling $384.7 million. Please see note 22 to the financial statements, “Subsequent events” for repurchase activity in 2009.

On January 30, 2009 the Board of Directors authorized a dividend of 11.7 cents per share to be paid on March 30, 2009 to shareholders of record as of March 11, 2009. Our dividend policy continues to be reviewed at Board of Directors’ meetings, taking into consideration the current capital investment program and expected future cash flow generated from operations.

We expect that it will meet our cash requirements for 2009 and beyond from cash on hand, internally generated funds and from additional external financing if required.

In December 2006, our Peruvian Branch signed a contract with the Peruvian government committing our Company to make annual contributions for five years to support the regional development of Peru. The contributions are being used for social benefit programs. In 2008 and 2007, we made contributions of $18.9 million and $16.1 million out of 2007 and 2006 earnings, respectively and has charged 2008 earnings $12.2 million for the 2009 contribution. Future contributions could increase or decrease depending on earnings and copper prices. If the average annual LME copper price is below $1.79 per pound the contribution will cease.

In June 2004, the Peruvian Congress enacted legislation imposing a royalty charge to be paid by mining companies. Under this law, we are subject to a 1% to 3% charge, based on sales, applicable to the value of the concentrates produced. We made a provision of $53.9 million, $62.8 million and $67.2 million in 2008, 2007 and 2006, for this charge. During 2008, 2007 and 2006 we made payments of $58.0 million, $64.0 million and $67.1 million, respectively, related to this charge.

### Financing

Our total debt at December 31, 2008 was $1,306.4 million compared with $1,466.4 million at December 31, 2007 before the unamortized discount of notes issued under par of $16.4 million and $16.7 million at December 31, 2008 and 2007, respectively. The $160.0 million net decrease in total debt during 2008 was due to the payment of $150.0 million of Yankee bonds series A. With this payment the Series A Yankee bonds were fully repaid. Additionally we paid $10.0 million of its Mitsui loan

Our ratio of debt to total capitalization was 27.5% at December 31, 2008, compared with 27.3% at December 31, 2007.

### Capital Expenditure Programs

A discussion of our capital expenditure programs is an important part of understanding our liquidity and capital resources. We expect to meet the cash requirements for these capital expenditures from cash on hand, internally generated funds and from additional external financing if required. For information regarding our capital expenditure programs, please see the discussion under the caption “Capital Expansion Program” of this section.

### Contractual Obligations

The following table summarizes our significant contractual obligations as of December 31, 2008:

*(dollars in millions)*

|  | Payments due by Period Total | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 and Thereafter |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Long-term debt | $1,306.4 | $10.0 | $10.0 | $10.0 | $10.0 | $10.0 | $1,256.4 |
| Interest on debt | 2,188.2 | 94.7 | 94.2 | 94.0 | 93.5 | 93.3 | 1,718.5 |
| FIN No. 48 (a) | 70.3 | — | — | — | — | — | — |
| Workers’ participation | 218.9 | 218.9 |  |  |  |  |  |
| Contribution to the Peruvian regional development | 12.2 | 12.2 |  |  |  |  |  |
| Pension and post-retirement obligations | 93.5 | 24.6 | 5.2 | 5.4 | 5.6 | 6.0 | 46.7 |
| Purchase obligations: |  |  |  |  |  |  |  |
| Commitment to purchase energy | 1,061.0 | 184.3 | 134.0 | 117.3 | 117.3 | 117.3 | 390.9 |
| Capital expenditure projects and material | 596.2 | 273.0 | 323.2 | — | — | — | — |
| Total | $5,546.7 | $817.7 | $566.6 | $226.7 | $226.4 | $226.6 | $3,412.5 |

(a) The above table does not include any future payment related to FIN No.48 liabilities because there is often a high degree of uncertainty regarding the timing of future cash outflows. As of December 31, 2008 the liability recognized by the Company is $70.3 million and is included as non-current liability in the consolidated balance sheet.

Interest on debt is calculated at rates in effect at December 31, 2008. Please refer to “Note 11-Financing” of our consolidated financial statements for a description of our long-term debt arrangements and credit facilities.

Workers’ participation is currently calculated based on Peruvian branch and Mexican pre-tax earnings. In Peru, the provision for workers’ participation is calculated at 8% of pre-tax earnings. The current portion of this participation, which is accrued during the year, is based on Branch’s taxable income and is distributed to workers following determination of final results for the year. In Mexico, workers’ participation is determined using the guidelines established in the Mexican income tax law at a rate of 10% of pre-tax earnings as adjusted by the tax law.

Pursuant to our agreement with the Peruvian Government signed on December 28, 2006 we have committed to make annual contributions for five years for the regional development of Peru based on Peruvian Branch earnings after income tax. Future contributions could increase or decrease depending on copper prices. The commitment of the Branch is for a total of 1.25% of its annual earnings, after Peruvian income tax. If the average annual LME copper price drops below $1.79 per pound the contribution will cease. For an additional discussion on this matter please see “Regional development contribution” on “Note 14-Commitments and Contingencies” of the consolidated financial statements.

Pension and post retirement obligations include the benefit expected to be paid under our post-retirement benefit plans. Please refer to Note 12 “Benefit plans” of our consolidated financial statements.

We have a commitment to purchase power for our Peruvian operations from Energia del Sur, S.A. until 2017. Amounts indicated on the above table are based on power costs in 2008, which are subject to change as energy generation costs change and our forecasted power requirements through the life of the agreements change.

Capital expenditure projects include committed purchase orders and executed contracts principally for our Peruvian projects of Tia Maria and the Toquepala concentrator expansion. These commitments are under re-evaluation and subject to renegotiation due to the current economic situation. Also, this line item includes committed purchase orders for operating material at our operations.

### Non-GAAP Information Reconciliation-

Following is a reconciliation of “Operating Cash Cost” (see page 80) to GAAP cost of sales in millions of dollars and cents per pound in the table below:

|  | 2008 $ million | $ per unit | 2007 $ million | $ per unit | 2006 $ million | $ per unit |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Cost of sales (exclusive of depreciation, amortization and depletion)—GAAP | $2,182.2 | $1.890 | $2,122.2 | $1.644 | $2,019.8 | $1.468 |
| Add: |  |  |  |  |  |  |
| Selling, general and administrative | 102.4 | 0.089 | 98.0 | 0.076 | 88.3 | 0.064 |
| Treatment and refining charges | 40.8 | 0.035 | 57.9 | 0.045 | 61.0 | 0.044 |
| By-product revenue (1) | (1,584.8) | (1.373) | (1,952.7) | (1.513) | (1,547.1) | (1.124) |
| Less: |  |  |  |  |  |  |
| Workers’ participation | (212.1) | (0.184) | (310.9) | (0.241) | (271.5) | (0.197) |
| Royalty charge and other, net | (111.1) | (0.095) | (155.0) | (0.120) | (127.1) | (0.093) |
| Inventory change | (23.9) | (0.021) | (31.5) | (0.024) | (4.4) | (0.003) |
| **Operating Cash Cost** | **$393.5** | **$0.341** | **$(172.0)** | **$(0.133)** | **$219.0** | **$0.159** |
| Less by-product revenue | 1,584.8 | 1.373 | 1,952.7 | 1.513 | 1,547.1 | 1.124 |
| Operating Cash Cost, without by-product revenue | $1,978.3 | $1.714 | $1,780.7 | $1.380 | $1,766.1 | $1.283 |
| Total pounds of copper produced and purchased (in millions) | 1,154.6 |  | 1,291.0 |  | 1,375.9 |  |

(1) Includes net by-product sales revenue and premiums on sales of refined products.

## Market risk

As filed, 15,758 characters.

A portion of our outstanding debt bears interest at variable rates and accordingly is sensitive to changes in interest rates. Interest rate changes would also result in gains or losses in the market value of our fixed rate debt portfolio due to differences in market interest rates and the rates at the inception of the debt agreements. Based upon our indebtedness at December 31, 2008, a change in interest rates of one percent (or 100 basis points) would impact net income and cash flows by $0.5 million annually.

We are also exposed to market risk associated with changes in foreign currency exchange rates as certain costs incurred are in currencies other than our functional currency, the U.S. dollar. To manage the volatility related to the risk, we may enter into forward exchange contracts, currency swaps or other currency hedging arrangements. Portions of our operating costs are denominated in Peruvian nuevos soles and Mexican pesos. Since our revenues are primarily denominated in U.S. dollars, when inflation/deflation in Peru or Mexico is not offset by a change in the exchange rate of the nuevo sol or the peso, respectively, to the dollar, our financial position, results of operations and cash flows could be adversely affected to the extent that the inflation/devaluation effects are passed onto us by our suppliers or reflected in our wage adjustments. In addition, the dollar value of our net monetary assets denominated in nuevos soles or pesos can be affected by devaluation of the nuevo sol or the peso, resulting in a remeasurement loss in our financial statements. Recent inflation and devaluation rates are provided in the table below.

| Peru | Year Ended December 31, 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Peruvian inflation rate | 6.6% | 3.9% | 1.1% |
| Nuevo sol/dollar devaluation/(appreciation) rate | 4.8% | (6.3)% | (6.8)% |
| Mexico |  |  |  |
| Mexican inflation rate | 6.5% | 3.8% | 4.1% |
| Peso/dollar devaluation/(appreciation) rate | 24.5% | (0.1)% | 1.5% |

Change in monetary position:

Assuming an exchange rate change of 10% at December 31, 2008, we estimate our net monetary position in Peruvian nuevo sol and Mexican pesos would increase (decrease) our net earnings as follows:

| Variance | Effect in net earnings ($ in million) |
| --- | ---: |
| Appreciation of 10% in exchange rate of dollar vs. Nuevo sol | $12.9 |
| Devaluation of 10% in exchange rate of dollar vs. nuevo sol | $(15.7) |
| Appreciation of 10% in exchange rate of dollar vs. Mexican peso | $11.4 |
| Devaluation of 10% in exchange rate of dollar vs. Mexican peso | $(14.0) |

The net monetary position is the net of those assets and liabilities that are nuevo sol or peso denominated at December 31, 2008. It principally includes cash and various receivables and liabilities in local currencies.

Metal price sensitivity:

We are subject to market risks arising from the volatility of copper and other metal prices. Assuming that expected metal production and sales are achieved, that tax rates are unchanged, and giving no effects to potential hedging programs, metal price sensitivity factors would indicate estimated changes in net earnings resulting from metal price changes in 2009 as provided in the table below:

|  | Copper | Molybdenum | Zinc | Silver |
| --- | ---: | ---: | ---: | ---: |
| Change in metal prices (per pound except silver — per ounce) | $0.01 | $1.00 | $0.01 | $1.00 |
| Change in net earnings (in millions) | $6.0 | $22.4 | $1.3 | $9.7 |

We occasionally use derivative instruments to manage our exposure to market risk from changes in commodity prices, interest rate and exchange rate risk exposures. We generally do not enter into derivative contracts unless we anticipate a future activity that is likely to occur that will result in exposing our Company to market risk.

Copper and zinc swaps:

During 2008, 2007 and 2006 we entered into copper collar and swap contracts to protect a portion of our sales of copper production as follows

| Collar contracts: | 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Pounds (in millions) | 220.5 | 170.5 | — |
| Average LME cap price | $4.23 | $4.07 | — |
| Average LME floor price | $3.40 | $3.20 | — |
| Swap contracts: |  |  |  |
| Pounds (in millions) | 175.1 | 11.9 | 847.7 |
| Weighted average COMEX price | $3.87 | $3.71 | $3.17 |

Related to the settlement of these copper collar and swap contracts, we recorded gains of $137.0 million and $10.9 million in 2008 and 2007, respectively, and a loss of $276.1 million in 2006. These gains and losses were recorded in net sales on the consolidated statement of earnings. Also, these gains and losses were recorded in net earnings in operating activities of the consolidated statement of cash flow.

In addition, in 2006 we entered into a zinc swap contract to protect the cost of a portion of the zinc concentrates purchased during the recovery from a fire at the San Luis Potosi zinc refinery. Related to the settlement of this zinc swap contract we recorded a loss of $0.2 million in 2006. This loss was recorded in net sales on the consolidated statement of earnings. Also, this loss was recorded in net earnings in operating activities of the consolidated statement of cash flow. We did not enter into any zinc derivative contracts in 2008 and 2007.

At December 31, 2008 we did not hold any open copper or zinc derivative contracts.

Transactions under these metal price protection programs are not accounted for as hedges under SFAS No. 133 and are adjusted to fair market value based on the metal prices as of the last day of the respective reporting period with the gain or loss recorded in net sales on the consolidated statement of earnings.

Gas swaps:

In the last three years we entered into gas swap contracts to protect part of our gas consumption in both periods as follows:

|  | 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Gas volume (MMBTUs) | 460,000 | 900,000 | 3,650,000 |
| Fixed price | $8.2175 | $7.5250 | $4.2668 |
| (Loss) gain (in millions) | $(0.9) | $(0.9) | $6.3 |

The losses and gain obtained were included in the production cost. At December 31, 2008, we did not hold any open gas swap contracts.

Exchange Rate Derivatives, U.S. dollar / Mexican peso contracts:

Because more than 85% of our sales collections in Mexico are in US dollars and many of our costs are in Mexican pesos, we entered into zero-cost derivative contracts with the purpose of protecting, within a range, against an appreciation of the Mexican peso to the US dollar.

At December 31, 2008 we held two types of exchange rate derivative contracts:

In the first type of exchange rate derivative contract, if the exchange rate settles at or below the barrier price, we do not sell US dollars, if the exchange rate settles above the barrier price and below the strike price established in the contract, we sell the notional amount of US dollars settling in the week at the strike price. If the exchange rate settles above the strike price established in the contract, we sell double the underlying amount of US dollars settling in the week at the strike price established in the contract. At December 31, 2008, we held the following contracts of this type:

| Notional Amount (millions) | Underlying amount (millions) | Due Date, Weekly expiration until | Strike Price (Mexican Pesos/U.S. Dollars) | Barrier Price (Mexican Pesos/ U.S. Dollars) |
| ---: | ---: | --- | ---: | ---: |
| $15.0 | $1.25 | March 11, 2009 | 11.25 | 10.60 |

Each notional amount includes a group of underlying amount transactions that have the same strike and barrier price.

In the second type of exchange rate derivative contract, if the exchange rate is less than or equal to the strike price, we sell US dollars in an amount equal to the underlying amount for the expiration period at the strike price. The difference between the strike price and the market exchange rate is considered a gain to us. The total accumulated gain over the life of the contract cannot exceed 200 cents per dollar transacted in the first contract and 500 cents per dollar transacted in the second contract. If the exchange rate is above the strike price, we sell dollars in an amount equal to 2 times the underlying amount for the expiration period at the strike price and the loss does not reduce the accumulated gain. At December 31, 2008, we held the following contracts of this type:

| Notional Amount (millions) | Underlying amount (millions) | Expiration Period | Due Date | Strike Price (Mexican Pesos/ U.S. Dollars) |
| ---: | ---: | --- | --- | ---: |
| $15.0 | $2.5 | Monthly | January 13, 2009 through June 11, 2009 | 10.59 |
| $85.0 | $2.5 | Weekly | January 2, 2009 through August 21, 2009 | 10.53 |

Each notional amount includes a group of underlying amount transactions that have the same strike and barrier price.

The exercise of these zero-cost derivative contracts resulted in a realized loss of $17.8 million in 2008 and gains of $8.1 million and $0.9 million in 2007 and 2006, respectively, which were recorded as Loss on derivative instruments in the consolidated statement of earnings.

At December 31, 2008, the mark-to-market of the above listed exchange rate derivative contracts generated an unrealized loss of $56.8 million which was recorded as Loss on derivative instruments in the consolidated statement of earnings.

If the exchange rate of the Mexican Peso to the US Dollar were to increase or decrease by 10%, the additional loss or benefit of these derivative instruments would not be considered material to our overall results of operations.

Dual currency notes:

In 2007 we invested $560.0 million in dual currency notes which provided an above market interest return subject to a barrier range of the Mexican peso/US dollar exchange rates. Related to these investments we realized an exchange loss of $1.3 million, which was recorded as a loss on derivative instruments in the consolidated statement of earnings. At December 31, 2008, we did not hold any dual currency notes.

We earned interest of $2.1 million in 2007, which was recorded as interest income in the consolidated statement of earnings.

Short-term investments:

The balance of short-term investments was as follows (in millions):

| Investments | As of December 31, 2008 | December 31, 2007 |
| --- | ---: | ---: |
| Short-term investments in securities issued by public companies with a weighted average interest rate of 1.85%. | $62.4 | $117.9 |

Short-term investments in securities consist of available for sale securities issued by public companies. The Company has a diversified portfolio of investments.

In 2008, we earned interest of $4.1 million, respectively, related to these investments which were recorded as interest income in the consolidated statement of earnings. In addition, in 2008, we redeemed $45.2 million of these investments.

During 2008 we lost $10.3 million on these investments. We considered this loss to be other than temporary, and therefore have recorded it as other expense in the consolidated statement of earnings.

During 2007 we invested $380.0 million in investment instruments, some of which were indexed to SCC common stock prices while others were leveraged and indexed to certain bond pools. The entire amount of these investment instruments were liquidated during the course of 2007. Related to these investments, we realized losses of $81.0 million in 2007 which were recorded as loss on derivative instruments in the consolidated statement of earnings. Additionally, we earned interest of $18.7 million on these investments in 2007 which were recorded in interest income in the consolidated statement of earnings.

### Impact of New Accounting Standards

In December 2008 the FASB approved FASB Staff Position (FSP) No. FAS 132(R)-1, “Employers’ Disclosures about Pensions and Other Postretirement Benefits” (FSP No. FAS

132(R)-1), which provides guidance on an employer’s disclosures about plan assets of a defined benefit pension or other postretirement plan. This FSP also includes a technical amendment to Statement 132(R) that requires a nonpublic entity to disclose net periodic benefit cost for each annual period for which a statement of income is presented. The disclosures about plan assets required by this FSP shall be provided for fiscal years ending after December 15, 2009.

In May 2008, the FASB issued SFAS No. 162, “The Hierarchy of Generally Accepted Accounting Principles.” This statement identifies the sources of accounting principles and the framework for selecting the principles to be used in the preparation of financial statements that are presented in conformity with U.S. GAAP. This statement is effective 60 days following the SEC’s approval of the Public Company Accounting Oversight Board amendments to AU Section 411, “The Meaning of Present Fairly in Conformity With Generally Accepted Accounting Principles.” We do not expect any material impact on our financial position and results of operations with the adoption of this statement.

On March 19, 2008 the FASB issued SFAS No. 161, “Disclosures about Derivative Instruments and Hedging Activities.” The new standard is intended to improve financial reporting about derivative instruments and hedging activities by requiring enhanced disclosures to enable investors to better understand their effects on an entity’s financial position, financial performance and cash flows. This statement is effective for financial statements issued for fiscal years and interim periods beginning after November 15, 2008. We are currently analyzing the effect that this statement will have on our financial position and results of operations.

In December 2007, the FASB published SFAS No. 160 “Non Controlling Interests in Consolidated Financial Statements” — an amendment of ARB No. 51. This statement addresses the reporting of minority interests in the results of the parent and provides direction for the recording of such interests in the financial statements. It also provides guidance for the recording of various transactions related to the minority interests, as well as certain disclosure requirements.

SFAS No. 160 will be effective for fiscal years, and interim periods beginning after December 15, 2008, earlier adoption is prohibited and shall be applied prospectively. The presentation and disclosure requirements shall be applied retrospectively for all periods presented. We have adopted this pronouncement on January 1, 2009.

The adoption of this statement will cause some changes to our presentation of financial results and our statement of position. However, these changes are not expected to be of a material nature.

In December 2007, the FASB published SFAS No. 141-R, which replaces SFAS No. 141, “Business Combinations.” This statement improves the reporting of information about a business combination and its effects. This statement establishes principles and requirements for how the acquirer will recognize and measure the identifiable assets acquired, the liabilities assumed, and any non-controlling interest in the acquisition. Also, the statement determines the recognition and measurement of goodwill acquired in the business combination or a gain from a bargain purchase, and finally, determines the disclosure requirements to enable users of the financial statements to evaluate the nature and financial effects of the business combination.

SFAS No 141-R will be effective for all business combinations with an acquisition date on or after the beginning of the first annual reporting period after December 15, 2008, earlier adoption is prohibited. The Company has adopted this pronouncement on January 1, 2009 to be applied in any future business combination.

## Controls and procedures

As filed, 2,803 characters.

As of December 31, 2008, the Company conducted an evaluation under the supervision and with the participation of the Company’s Disclosure Committee and the Company’s management, including the Chief Executive Officer and Chief Financial Officer, of the effectiveness and the design and operation of the Company’s disclosure controls and procedures. Based on that evaluation, the Chief Executive Officer and the Chief Financial Officer have concluded that the Company’s disclosure controls and procedures are effective as of December 31, 2008, to ensure that information required to be disclosed in reports filed or submitted under the Exchange Act is:

1\. recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and

2\. accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

#### CHANGES IN INTERNAL CONTROL OVER FINANCIAL REPORTING

There was no change in the Company’s internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934, as amended) that occurred during the quarter ended December 31, 2008 that has materially affected, or is reasonably likely to materially affect, the Company’s internal controls over financial reporting.

#### MANAGEMENT’S REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

Management is responsible for establishing and maintaining adequate internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the Company. Under the supervision and with the participation of management, including the Company’s principal executive officer and principal financial officer, the Company conducted an evaluation of the effectiveness of its internal control over financial reporting based on the framework in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organization of the Treadway Commission. Based on the evaluation made under this framework, management concluded that as of December 31, 2008 such internal control over financial reporting is effective.

Because of its inherent limitations, internal control over financial reporting, may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness for future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with policies or procedures may deteriorate.

The Company’s internal control over financial reporting as of December 31, 2008 has been audited by PricewaterhouseCoopers, an independent registered public accounting firm, as stated in their report which appears herein.

Filed Mar 2, 2009.
Source: SEC EDGAR, the filing index for accession 0001104659-09-013233. Last ingested by Listed: Nov 4, 2026, 00:34 ET. No prices; not investment advice.
