# Royal Gold Inc: Form 10-Q for the period ended Sep 30, 2010

- Company: [Royal Gold Inc](/companies/rgld.md) (CIK 85535)
- Form: 10-Q
- Filed: 2010-11-05
- Accepted by EDGAR: Nov 4, 2010, 17:56 ET
- Period: 2010-09-30
- Accession: 0001104659-10-056164
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/85535/000110465910056164/a10-20534_110q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/85535/000110465910056164/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2010-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Operating income | 3 months, 2010-07-01 to 2010-09-30 | $20.8m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2010-07-01 to 2010-09-30 | $6.9m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2010-07-01 to 2010-09-30 | $11.8m | us-gaap:NetIncomeLoss |
| Diluted shares (weighted) | 3 months, 2010-07-01 to 2010-09-30 | 55,250,028 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2010-07-01 to 2010-09-30 | $34.2m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Dividends paid | 3 months, 2010-07-01 to 2010-09-30 | $5.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2010-09-30 | $321.5m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2010-09-30 | $366.4m | us-gaap:AssetsCurrent |
| Total assets | at 2010-09-30 | $1.86bn | us-gaap:Assets |
| Current liabilities | at 2010-09-30 | $37.2m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2010-09-30 | $421.3m | us-gaap:Liabilities |
| Shareholders' equity | at 2010-09-30 | $1.41bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 34,159 characters.

### General

Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) is intended to provide information to assist you in better understanding and evaluating our financial condition and results of operations. We recommend that you read this MD&A in conjunction with our consolidated financial statements included in Item 1 of this Quarterly Report on Form 10-Q, as well as our Annual Report on Form 10-K for the fiscal year ended June 30, 2010 filed with the Securities and Exchange Commission (the “SEC”) on August 26, 2010 (the “Fiscal 2010 10-K”).

This MD&A contains forward-looking information. You should review our important note about forward-looking statements following this MD&A.

We refer to “GSR,” “NSR,” and other types of royalty interests throughout this MD&A. These terms are defined in our Fiscal 2010 10-K.

### Overview

Royal Gold, together with its subsidiaries, is engaged in the business of acquiring and managing precious metals royalties and similar interests. Royalties are passive (non-operating) interests in mining projects that provide the right to revenue or production from the project after deducting specified costs, if any. We seek to acquire existing royalties or to finance projects that are in production or in development stage in exchange for royalties or similar interests. We are engaged in a continual review of opportunities to acquire existing royalties, to create new royalties or similar interests through the financing of mine development or exploration, or to acquire companies that hold royalties. We currently, and generally at any time, have acquisition opportunities in various stages of active review, including, for example, our engagement of consultants and advisors to analyze particular opportunities, analysis of technical, financial and other confidential information, submission of indications of interest, participation in preliminary discussions and involvement as a bidder in competitive auctions.

As of September 30, 2010, the Company owns royalties on 34 producing properties, 23 development stage properties and 130 exploration stage properties, of which the Company considers 39 to be evaluation stage projects. The Company uses “evaluation stage” to describe exploration stage properties that contain mineralized material and on which operators are engaged in the search for reserves. We do not conduct mining operations nor are we required to contribute to capital costs, exploration costs, environmental costs or other mining costs on the properties in which we hold royalty interests. During the three months ended September 30, 2010, we focused on the management of our existing royalty interests and the acquisition of royalty and similar interests.

Our financial results are primarily tied to the price of gold, silver, copper, nickel and other metals, as well as production from our producing stage royalty interests. The price of gold, silver, copper, nickel and other metals have fluctuated widely in recent years. The marketability and the price of gold, silver, copper, nickel and other metals are influenced by numerous factors beyond the control of the Company and may have a material and adverse effect on the Company’s results of operations and financial condition.

For the three months ended September 30, 2010 and 2009, gold, silver, copper and nickel price averages and percentage of royalty revenues by metal were as follows:

| Metal | Three months ended September 30, 2010 Average Price | Percentage of Royalty Revenue | September 30, 2009 Average Price | Percentage of Royalty Revenue |
| --- | ---: | ---: | ---: | ---: |
| Gold ($/ounce) | $1,227 | 73% | $960 | 86% |
| Silver ($/ounce) | $18.97 | 4% | $14.69 | 2% |
| Copper ($/pound) | $3.29 | 9% | $2.65 | 7% |
| Nickel ($/pound) | $9.61 | 9% | $7.99 | 3% |
| Other | N/A | 5% | N/A | 2% |

15

### Principal Royalties

Our principal producing royalty interests are shown in the following table. The Company considers both historical and future potential revenues in determining which royalties in our portfolio are principal to our business. Estimated future potential royalty revenues from both producing and development properties are based on a number of factors, including reserves subject to our royalty interests, production estimates, feasibility studies, metal price assumptions, mine life, legal status and other factors and assumptions, any of which could change and could cause Royal Gold to conclude that one or more of such royalties is no longer principal to our business.

Please refer to our Fiscal 2010 10-K for further discussion of our principal producing royalty interests.

| Mine | Location | Operator | Royalty (Gold unless otherwise stated) |
| --- | --- | --- | --- |
| Cortez | Nevada, USA | Barrick Gold Corporation (“Barrick”) | GSR1: 0.40% to 5.0% sliding-scale GSR GSR2: 0.40% to 5.0% sliding-scale GSR GSR3: 0.71% GSR NVR1: 0.39% NVR |
| Robinson | Nevada, USA | Quadra Mining Ltd. (“Quadra”) | 3.0% NSR (copper, gold, silver, molybdenum) |
| Leeville | Nevada, USA | Newmont Mining Corporation (“Newmont”) | 1.8% NSR |
| Peñasquito | Zacatecas, Mexico | Goldcorp Inc. (“Goldcorp”) | 2.0% NSR (gold, silver, lead, zinc) |
| Mulatos(1) | Sonora, Mexico | Alamos Gold, Inc. (“Alamos”) | 1.0% to 5.0% sliding-scale NSR |
| Dolores | Chihuahua, Mexico | Minefinders Corporation, Ltd. (“Minefinders”) | 3.25% NSR; 2.0% NSR (silver) |
| Voisey’s Bay | Newfoundland and Labrador, Canada | Vale Inco Ltd. (“Vale”) | 2.7% NSR (nickel, copper, cobalt) |
| Andacollo | Region IV, Chile | Compañía Minera Teck Carmen de Andacollo | 75% of gold produced |
| Gwalia Deeps | Western Australia, Australia | St. Barbara Limited (“St. Barbara”) | 1.5% NSR |
| Taparko(2) | Burkina Faso, West Africa | High River Gold Mines Ltd. (“High River”) | 15% GSR (TB-GSR1); 0% to 10% sliding-scale GSR (TB-GSR2); 2.0% GSR (TB-GSR3) |
| Las Cruces | Andalucía, Spain | Inmet Mining (“Inmet”) | 1.5% NSR (copper) |

(1) The Mulatos royalty is capped at 2.0 million gold ounces of production. Approximately 610,000 cumulative ounces of gold have been produced as of September 30, 2010.

(2) As of September 30, 2010, the Company has recognized $35.0 million associated with TB-GSR1. In October 2010, the Company received the remaining amounts due associated with the $35.0 million cap. Upon receipt of the remaining amounts due, TB-GSR1 and TB-GSR2 were terminated, and the Company’s perpetual 2.0% GSR royalty (TB-GSR3) became effective. The TB-GSR3 royalty covers all gold produced from the Taparko mine.

Our principal development royalties are shown in the following table and are not yet in production. Please refer to our Fiscal 2010 10-K for further discussion of our principal development stage royalty interests.

| Mine | Location | Operator | Royalty or similar interests (Gold unless otherwise stated) |
| --- | --- | --- | --- |
| Pascua-Lama(1) | Region III, Chile | Barrick | 0.78% to 5.23% sliding-scale NSR |
|  |  |  | 1.05% fixed rate royalty (copper) |
| Canadian Malartic(2) | Quebec, Canada | Osisko Mining Corporation (“Osisko”) | 2.0% to 3.0% sliding-scale NSR |
| Holt(3) | Ontario, Canada | St Andrew Goldfields Ltd. (“St Andrew”) | 0.00013 x quarterly average gold price NSR |
| Mt. Milligan(4) | British Columbia, Canada | Terrane Metals Corp. (“Terrane”) | 25% of the payable gold |
| Wolverine | Yukon Territory, Canada | Yukon Zinc Corporation (“Yukon Zinc”) | 0.00% to 9.45% sliding-scale NSR (gold and silver) |

(1) Refer to “Recent Developments, Business Developments” below within this MD&A for a further discussion on the acquisition of additional royalty interests at Pascua-Lama.

(2) The Canadian Malartic royalty is subject to a buy down right, which if exercised by Osisko would lower the sliding-scale NSR royalty to 1.0% to 1.5%.

(3) Operator has contested the royalty rate and its obligation to pay the royalty. See Note 11 to our consolidated financial statements for further information.

(4) Refer to “Recent Developments, Business Developments” below within this MD&A for a further discussion on the acquisition of the Mt. Milligan gold stream.

### Operators’ Production Estimates by Royalty for Calendar 2010

We received annual production estimates from the operators of our producing mines during the first calendar quarter of 2010. The following table shows such production estimates for our principal producing properties for calendar 2010 as well as the actual production reported to us by the various operators through September 30, 2010. The estimates and production reports are prepared by the operators of the mining properties. We do not participate in the preparation or calculation of the operators’ estimates or production reports and have not independently assessed or verified the accuracy of such information.

Operators’ Production Estimate by Royalty for Calendar 2010 and Reported Production

Principal Producing Properties

For the period January 1, 2010 through September 30, 2010

| Royalty | Calendar 2010 Operator’s Production Estimate(1) Gold (oz.) | Silver (oz.) | Base Metals (lbs.) | Reported Production through September 30, 2010(2) Gold (oz.) | Silver (oz.) | Base Metals (lbs.) |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Andacollo(3) | 27,000 |  |  | 13,050 | — | — |
| Cortez GSR1 | 241,000 | — | — | 169,653 | — | — |
| Cortez GSR2 | — | — | — | 1,239 | — | — |
| Cortez GSR3 | 241,000 | — | — | 170,892 | — | — |
| Cortez NVR1 | 188,000 | — | — | 123,558 | — | — |
| Dolores(4),(5) | 91,000 | 2.3 million | — | 43,332 | 0.6 million | — |
| Gwalia Deeps | 102,000 |  |  | 74,270 | — | — |
| Las Cruces(4) |  |  |  |  |  |  |
| Copper |  |  | 161 million |  |  | 38.3 million |
| Leeville | 429,000 | — | — | 321,247 | — | — |
| Mulatos | 160,000 | — | — | 103,611 | — | — |
| Peñasquito(4) | 180,000 | 13.4 million |  | 102,568 | 8.5 million |  |
| Lead |  |  | 107 million |  |  | 56.0 million |
| Zinc |  |  | 135 million |  |  | 86.3 million |
| Robinson | 75,000 | — |  | 62,787 | — |  |
| Copper |  |  | 115 million |  |  | 83.1 million |
| Taparko(4) | 137,000 | — | — | 90,540 | — | — |
| Voisey’s Bay(4),(6) |  |  |  |  |  |  |
| Copper |  |  | N/A |  |  | 12.6 million |
| Nickel |  |  | N/A |  |  | 37.2 million |

(1) There can be no assurance that production estimates received from our operators will be achieved. Please refer to our cautionary language regarding forward-looking statements following this MD&A, as well as the Risk Factors identified in Part I, Item 1A, of our Fiscal 2010 10-K for information regarding factors that could affect actual results.

(2) Reported production relates to the amount of metal sales, subject to our royalty interests, for the period January 1, 2010 through September 30, 2010, as reported to us by the operators of the mines.

(3) The operator estimates that the mine will produce on average approximately 55,000 ounces of gold in concentrate annually for the first ten years of commercial production. The production estimate shown represents the expected ramp-up of production, beginning April 2010, to commercial production, which occurred during October 2010.

(4) Please refer to “Recent Developments, Property Developments” below within this MD&A for further discussion on updates at this property.

(5) Minefinders estimates that calendar 2010 production for gold will be between 91,000 ounces and 100,500 ounces of gold and silver production is estimated between 2.3 million ounces and 2.6 million ounces of silver.

(6) The Company has not received calendar 2010 production guidance from the operator.

### Recent Developments

#### Business Developments

#### Acquisition of Additional Royalty Interests at Pascua-Lama

On July 1, 2010, the Company entered into two separate assignment of rights agreements with two private Chilean citizens whereby Royal Gold acquired an additional 0.75% NSR sliding-scale royalty on the Pascua-Lama project, which is owned and operated by Barrick and located on the border between Argentina and Chile, for a purchase price of $53 million. Of this amount, $25 million was paid immediately to acquire an additional 0.35% royalty interest. A deferred payment of $28 million was made on October 28, 2010, to acquire the remaining 0.40% royalty interest. Upon the October 28, 2010 closings, Royal Gold’s total gold NSR royalty interest in the Pascua-Lama project increased to 5.23%, at gold prices above $800 per ounce. Pursuant to the assignment of rights agreements, Royal Gold also acquired a 0.20% fixed-rate NSR copper royalty that takes effect after January 1, 2017, increasing Royal Gold’s copper royalty interest in the Pascua-Lama project to 1.05%.

#### Mt. Milligan Gold Stream Acquisition

On October 20, 2010, the Company entered into a Purchase and Sale Agreement (the “Purchase and Sale Agreement”) pursuant to which a wholly-owned subsidiary of the Company, RGL Royalty AG (“RGL”), acquired the right to 25% of the payable gold produced from the Mt. Milligan copper-gold project in British Columbia (the “Gold Purchase Transaction”) from Terrane, a wholly-owned subsidiary of Thompson Creek Metals Company Inc. (“Thompson Creek”). The parties entered into the Purchase and Sale Agreement concurrently with the consummation of Thompson Creek’s acquisition of Terrane.

Pursuant to the Purchase and Sale Agreement, RGL paid $226.5 million at the closing of the Gold Purchase Transaction. In the future, upon satisfaction of certain conditions set forth in the Purchase and Sale Agreement, RGL will make additional payments (each, an “Additional Payment”) to Terrane in an amount not to exceed $85 million in the aggregate to fund a portion of the development costs of the Mt. Milligan project. RGL paid the $226.5 million portion of the total consideration from cash on hand. Upon commencement of production at the Mt. Milligan project, RGL will purchase 25% of the payable gold with a cash payment equal to the lesser of $400 or the prevailing market price for each payable ounce of gold until 550,000 ounces have been delivered to RGL and the lesser of $450 or the prevailing market price for each additional ounce thereafter. The Purchase and Sale Agreement also contains representations and warranties, covenants, conditions and indemnification provisions in respect of each party.

#### Property Developments

The following information is provided by the operators of the property, either to Royal Gold or in various documents made publicly available.

#### Andacollo

Teck Resources Limited (“Teck”) declared commercial production at the Andacollo mine beginning October 1, 2010. Teck described the achievement of commercial production as marking the completion of project development, commissioning and operational ramp-up. The plant has been averaging 53,000 tonnes of ore per day or 97% of design capacity of 55,000 tonnes per day. The ramp-up that began in mid-February was completed by the end of September, within seven months of first ore to the mill. Royalty payments from our Andacollo interest began with the commencement of shipments in May 2010.

#### Dolores

Minefinders reported that gold and silver production at the Dolores mine decreased in the second and third quarters of calendar 2010 due to lower average ore grades stacked on the leach pad and due to remediation work required to repair a tear in the Phase 1 leach pad that was discovered towards the end of June 2010. Heavy rains at site hampered the repair work and prompted the removal and placement of a large portion of un-leached ore on the Phase 2 leach pad. Minefinders has not released revised production guidance, but they have indicated that production from the third quarter of calendar 2010 is likely to be deferred.

#### Las Cruces

Inmet’s Las Cruces copper operation in Spain continues to experience difficulties as they start up production. Inmet reported that plant reliability has improved significantly and no substantial mechanical downtime was experienced during the third calendar quarter of 2010. Inmet is currently in the process of ramping-up throughput and production at Las Cruces. Inmet has revised their copper production objective for calendar 2010 at Las Cruces to 20,000 tonnes of copper cathode to reflect the slower ramp-up.

#### Peñasquito

In September 2010, Goldcorp reported that their annual guidance for gold sales of 180,000 ounces from the Peñasquito mine remains unchanged. Goldcorp also reported that they have declared commercial production, realized combined 30-day average throughput rates in excess of 70,000 tonnes per day, including peak daily throughput as high as 105,000 tonnes and continue on track with construction of the 30,000 tonne-per-day high pressure grinding roll circuit that was targeted for completion in early October. Goldcorp has reported that they are still on schedule for full production ramp-up to designed capacity of 130,000 tonnes-per-day in early calendar 2011, and concentrate sales are ramping up according to expectations.

#### Taparko

The Taparko mine commenced gold production in August 2007 and has contributed approximately $57.4 million in royalty revenue (from TB-GSR1 and TB-GSR2, collectively) since production commenced. During the quarter ended September 30, 2010, the $35 million cap associated with TB-GSR1 was achieved and the 2.0% GSR royalty (TB-GSR3) became effective. The TB-GSR1 and TB-GSR2 royalties terminated upon receipt of the remaining amounts due under the $35 million cap, which occurred in October 2010. The TB-GSR3 royalty covers all gold produced from the Taparko mine.

Refer to the Company’s Fiscal 2010 10-K for discussion regarding Somita SA’s breach of certain obligations under the Amended and Restated Funding Agreement dated February 22, 2006 between Royal Gold, Inc. and Somita SA. There were no material developments during the three months ended September 30, 2010 with respect to Somita SA’s breach.

#### Voisey’s Bay

Vale and United Steel Workers Local 9508 conducted sporadic discussions during the third calendar quarter of 2010 to address issues surrounding the strike that began August 1, 2009. Reports from October 20, 2010 have indicated that negotiations ended without an agreement. While we are unable to speculate on possible resolution of the dispute, Vale reported that the Canadian nickel operations were returning to normalcy, which includes a ramp-up of Voisey’s Bay mining and processing operations.

#### Canadian Malartic

Osisko reported that construction at the Canadian Malartic mine and mill facilities continue to advance. From June 2010 to September 2010, the mining fleet started pre-production mine activities, 67% of the project’s costs have been spent and 89% have been committed. Construction of new institutional buildings is nearing completion and residential relocation is 100% complete. Osisko reported that they remain on track towards their scheduled start-up and expect to be fully operational during the second quarter of calendar 2011.

#### Wolverine

Yukon Zinc reported that they are feeding stockpiled low grade ore to the plant as they finish commissioning of the mill. All three circuits (the lead, copper and zinc circuits) are operational. Yukon Zinc plans to feed ore to the plant from the underground mine in December 2010.

### Results of Operations

#### Quarter Ended September 30, 2010, Compared to Quarter Ended September 30, 2009

For the quarter ended September 30, 2010, we recorded net income attributable to Royal Gold stockholders of $11.8 million, or $0.22 per basic share and $0.21 per diluted share, as compared to net income attributable to Royal Gold stockholders of $7.1 million, or $0.18 per basic share and $0.17 per diluted share, for the quarter ended September 30, 2009. The increase in our earnings per share was primary attributable to an increase in royalty revenue, as discussed further below. This increase was partially offset by an increase in general and administrative and depletion expenses during the period, which are also discussed further below.

For the quarter ended September 30, 2010, we recognized total royalty revenue of $45.3 million (which includes $0.4 million of non-controlling interests), at an average gold price of $1,227 per ounce and an average copper price of $3.29 per pound, compared to royalty revenue of $26.1 million (which includes $0.4 million of non-controlling interests), at an average gold price of $960 per ounce and an average copper price of $2.65 per pound for the quarter ended September 30, 2009. Royalty revenue and the corresponding production, attributable to our royalty interests, for the quarter ended September 30, 2010 compared to the quarter ended September 30, 2009 is as follows:

Royalty Revenue and Production Subject to Our Royalty Interests

Quarter Ended September 30, 2010 and 2009

(In thousands, except reported production ozs. and lbs.)

| Royalty Metal(s) | Three Months Ended September 30, 2010 Royalty Revenue | Reported Production(1) |  | Three Months Ended September 30, 2009 Royalty Revenue | Reported Production(1) |  |
| --- | ---: | ---: | --- | ---: | ---: | --- |
| Andacollo(2),(3) Gold | $8,174 | 8,905 | oz. | N/A | N/A |  |
| Taparko(2) Gold | $7,567 | 30,587 | oz. | $5,966 | 25,350 | oz. |
| Voisey’s Bay(2),(4) | $3,506 |  |  | N/A |  |  |
| Nickel |  | 18.2 million | lbs. |  | N/A |  |
| Copper |  | 3.9 million | lbs. |  | N/A |  |
| Robinson | $3,128 |  |  | $1,855 |  |  |
| Gold |  | 19,012 | oz. |  | 18,269 | oz. |
| Copper |  | 28.5 million | lbs. |  | 21.1 million | lbs. |
| Peñasquito(2) | $3,006 |  |  | $626 |  |  |
| Gold |  | 35,624 | oz. |  | 22,900 | oz. |
| Silver |  | 3.2 million | oz. |  | 651,812 | oz. |
| Lead |  | 21.9 million | lbs. |  | N/A |  |
| Zinc |  | 39.0 million | lbs. |  | N/A |  |
| Leeville Gold | $2,635 | 122,834 | oz. | $2,317 | 133,821 | oz. |
| Cortez Gold | $2,487 | 33,134 | oz. | $5,827 | 94,864 | oz. |
| Mulatos Gold | $1,724 | 29,025 | oz. | $2,224 | 46,440 | oz. |
| Las Cruces(4) Copper | $875 | 17.5 million | lbs. | N/A | N/A |  |
| Gwalia Deeps(4) Gold | $493 | 26,644 | oz. | N/A | N/A |  |
| Dolores | $399 |  |  | $1,111 |  |  |
| Gold |  | 8,479 | oz. |  | 19,305 | oz. |
| Silver |  | 160,254 | oz. |  | 349,248 | oz. |
| Other(5) Various | $11,344 | N/A |  | $6,187 | N/A |  |
| **Total Royalty Revenue** | **$45,338** |  |  | **$26,113** |  |  |

(1) Reported production relates to the amount of metal sales, subject to our royalty interests, for the three months ended September 30, 2010 and 2009, as reported to us by the operators of the mines.

(2) Refer to “Recent Developments, Property Developments” earlier within this MD&A for further discussion of recent developments at the property.

(3) Royalty acquired in January 2010.

(4) Royalty acquired in February 2010 as part of the acquisition of International Royalty Corporation (“IRC”).

(5) “Other” includes all of the Company’s non-principal producing royalties as of September 30, 2010. “Other” for the three months ended September 30, 2009 included all of the Company’s non-principal producing royalties, Siguri and Goldstrike. Siguiri and Goldstrike were principal during our fiscal year 2010 and contributed $1.4 million and $1.0 million, respectively, during the quarter ended September 30, 2009. Individually, no royalty included within the “Other” category contributed greater than 5% of our total royalty revenue for either period.

The increase in royalty revenue for the quarter ended September 30, 2010, compared with the quarter ended September 30, 2009, resulted primarily from an increase in the average gold and copper prices, revenue from the recently acquired Andacollo royalty, additional revenue from the recently acquired IRC producing royalties ($7.8 million), the continued ramp-up at Peñasquito and an increase in production at Taparko and Robinson. These increases were partially offset by a decrease in production at Cortez and Dolores. Please refer to “Recent Developments, Property Developments” earlier within this MD&A for further discussion on recent developments regarding properties covered by certain of our royalty interests.

General and administrative expenses increased to $3.7 million for the quarter ended September 30, 2010, from $2.2 million for the quarter ended September 30, 2009. The increase was primarily due to an increase in audit fees from the Company’s previous independent registered accountants of approximately $0.4 million, increase in general corporate costs of $0.4 million and an increase in employee related costs of approximately $0.4 million. The increase in general corporate costs was attributable to an increase in stock exchange listing fees. Approximately $0.3 million of the increase in employee related costs was attributable to severance related costs, which are one-time, non-recurring charges.

The Company recorded total non-cash stock-based compensation expense related to our equity compensation plans of $1.3 million for the quarter ended September 30, 2010, compared to $1.2 million for the quarter ended September 30, 2009. Our non-cash stock-based compensation expense is allocated among costs of operations, general and administrative, and exploration and business development in our consolidated statements of operations and comprehensive income. Please refer to Note 6 of the notes to consolidated financial statements for further discussion of the allocation of non-cash stock-based compensation expense for the quarters ended September 30, 2010 and 2009.

Depreciation, depletion and amortization increased to $18.9 million for the quarter ended September 30, 2010, from $11.1 million for the quarter ended September 30, 2009. The increase was primarily due to production from the royalties acquired from IRC, which resulted in additional depletion of approximately $4.8 million during the period. The increase was also attributable to depletion from the recently acquired Andacollo royalty, which resulted in additional depletion expense of approximately $2.4 million during the period.

Interest and other expense increased to $2.3 million for the three months ended September 30, 2010, from $0.4 million for the three months ended September 30, 2009. The increase was primarily due to an increase in interest expense of approximately $1.7 million, which was associated with the outstanding balances on the Company’s debt facilities during the period.

During the quarter ended September 30, 2010, we recognized income tax expense totaling $6.9 million compared with $3.0 million during the quarter ended September 30, 2009. This resulted in an effective tax rate of 34.8% in the current period, compared with 24.9% in the quarter ended September 30, 2009. The increase in the effective tax rate for September 30, 2010 is primarily related to (i) an increase in tax expense related to earnings from non-U.S. subsidiaries, and (ii) the decrease in the tax benefit received on the statutory tax related to income from non-controlling interests. For a complete discussion of the factors that influence our effective tax rate, refer to Note 11 to the notes to consolidated financial statements in the Company’s Fiscal 2010 10-K.

### Liquidity and Capital Resources

#### Overview

At September 30, 2010, we had current assets of $366.4 million compared to current liabilities of $37.2 million for a current ratio of 10 to 1. This compares to current assets of $371.3 million and current liabilities of $35.8 million at June 30, 2010, resulting in a current ratio of approximately 10 to 1. As discussed below and earlier in this MD&A, in October 2010, the Company paid $254.5 million from cash on hand for the Mt. Milligan gold stream and the additional Pascua-Lama royalty interests, which could lower the Company’s current ratio.

During the quarter ended September 30, 2010, liquidity needs were met from $45.3 million in royalty revenues (including $0.4 million of non-controlling interests) and our available cash resources. As of September 30, 2010, the Company had $125 million outstanding under its credit facility, the maximum amount available. In addition, as of September 30, 2010, the Company had $117 million outstanding under its term loan facility. Refer to Note 5 of our notes to consolidated financial statements for further discussion on our debt.

We believe that our current financial resources and funds generated from operations will be adequate to cover anticipated expenditures for debt service (current and long-term), cost of operation expenses, general and administrative expense costs, exploration and business development costs, and capital expenditures for the foreseeable future. Our current financial resources are also available for royalty acquisitions, including the $85 million commitment as part of the Mt. Milligan gold stream acquisition, and to fund dividends. Our long-term capital requirements are primarily affected by our ongoing acquisition activities. The Company currently, and generally at any time, has acquisition opportunities in various stages of active review. In the event of a substantial royalty or other acquisition, we would likely need to seek additional debt or equity financing opportunities.

Please refer to our risk factors included in Part 1, Item 1A of our Fiscal Year 2010 10-K for a discussion of certain risks that may impact the Company’s liquidity and capital resources.

#### Recent Liquidity and Capital Resource Developments

#### Acquisition of Additional Royalty Interests at Pascua-Lama

As further discussed earlier within this MD&A under “Recent Developments, Business Developments,” on July 1, 2010 and October 28, 2010, the Company paid a total of $53 million to acquire additional royalty interests at Pascua-Lama. The total consideration was funded using cash on hand.

#### Mt. Milligan Gold Stream Acquisition

As further discussed earlier within this MD&A under “Recent Developments, Business Developments,” on October 20, 2010, the Company completed the Gold Purchase Transaction. Total consideration paid at closing for the Gold Purchase Transaction was $226.5 million, which was funded using cash on hand.

The Company will make additional payments to Terrane not to exceed $85 million to fund a portion of the development costs at the Mt. Milligan project, subject to certain conditions.

### Recently Adopted and Issued Accounting Standards

Please refer to Note 1 of the notes to consolidated financial statements for a discussion on recently adopted and issued accounting standards.

### Forward-Looking Statements

Cautionary “Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995: With the exception of historical matters, the matters discussed in this report are forward-looking statements that involve risks and uncertainties that could cause actual results to differ materially from projections or estimates contained herein. Such forward-looking statements include statements regarding projected production estimates and estimates pertaining to timing and commencement of production from the operators of our royalty properties; the adequacy of financial resources and funds to cover anticipated expenditures for general and administrative expenses as well as costs associated with exploration and business development and capital expenditures, and our expectation that substantially all our revenues will be derived from royalty interests. Factors that could cause actual results to differ materially from these forward-looking statements include, among others:

- changes in gold and other metals prices on which our royalties are paid or prices associated with the primary metals mined at our royalty properties;
- the production at or performance of our producing royalty properties;
- decisions and activities of the operators of our royalty properties;
- the ability of operators to bring projects into production and operate in accordance with feasibility studies;
- liquidity or other problems our operators may encounter;
- unanticipated grade and geological, metallurgical, processing or other problems at the royalty properties;
- mine operating and ore processing facility problems, pit wall or tailings dam failures, natural catastrophes such as floods or earthquakes and access to raw materials, water and power;
- changes in project parameters as plans of the operators are refined;
- changes in estimates of reserves and mineralization by the operators of our royalty properties;
- economic and market conditions;
- future financial needs;
- federal, state and foreign legislation governing us or the operators of our royalty properties;
- the availability of royalties for acquisition or other acquisition opportunities and the availability of debt or equity financing necessary to complete such acquisitions;
- our ability to make accurate assumptions regarding the valuation, timing and amount of royalty payments when making acquisitions;
- risks associated with conducting business in foreign countries, including application of foreign laws to contract and other disputes, environmental and permitting laws, community unrest and labor disputes, and enforcement and uncertain political and economic environments;
- risks associated with issuances of substantial additional common stock or incurrence of substantial indebtedness in connection with acquisitions or otherwise;
- acquisition and maintenance of permits and authorizations, completion of construction and commencement and continuation of production at the royalty properties;
- changes to management and key employees; and
- failure to complete future acquisitions;

as well as other factors described elsewhere in this report and our other reports filed with the SEC. Most of these factors are beyond our ability to predict or control. Future events and actual results could differ materially from those set forth in, contemplated by or underlying the forward-looking statements. We disclaim any obligation to update any forward-looking statements made herein. Readers are cautioned not to put undue reliance on forward-looking statements.

## Market risk

As filed, 2,305 characters.

Our earnings and cash flow are significantly impacted by changes in the market price of gold, silver, copper, nickel and other metals. Gold, silver, copper, nickel and other metal prices can fluctuate significantly and are affected by numerous factors, such as demand, production levels, economic policies of central banks, producer hedging, world political and economic events, and the strength of the U.S. dollar relative to other currencies. Please see “*Volatility in gold, silver, copper and other metal prices may have an adverse impact on the value of our royalty interests and reduce our royalty revenues. Certain of our royalty contracts have feature that may amplify the negative effects of a drop in commodity prices,”* under Part I, Item 1A of our Fiscal 2010 10-K, for more information that can affect gold and other prices as well as historical gold, silver and copper prices.

During the three month period ended September 30, 2010, we reported royalty revenues of $45.3 million, with an average gold price for the period of $1,227 per ounce and an average copper price of $3.29 per pound. Approximately 73% of our total recognized revenues for the three months ended September 30, 2010 were attributable to gold sales from our gold producing royalty interests, as shown within the MD&A. For the three months ended September 30, 2010, if the price of gold had averaged higher or lower by $100 per ounce, we would have recorded an increase or decrease in revenue of approximately $2.7 million.

Approximately 9% of our total recognized revenues for the three months ended September 30, 2010 were attributable to copper sales from our copper producing royalty interests. For the three months ended September 30, 2010, if the price of copper had averaged higher or lower by $0.50 per pound, we would have recorded an increase or decrease in revenues of approximately $0.7 million, respectively.

Approximately 9% of our total recognized revenues for the three months ended September 30, 2010 were attributable to nickel sales from our nickel producing royalty interests. For the three months ended September 30, 2010, if the price of nickel had averaged higher or lower by $1.00 per pound, we would have recorded an increase or decrease in revenues of approximately $0.7 million, respectively.

## Controls and procedures

As filed, 2,212 characters.

### Evaluation of Disclosure Controls and Procedures

As of September 30, 2010, the Company’s management, with the participation of the President and Chief Executive Officer and its Chief Financial Officer and Treasurer, carried out an evaluation of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934, as amended (the “Exchange

Act”)). Based on such evaluation, the Company’s President and Chief Executive Officer and its Chief Financial Officer and Treasurer have concluded that, as of September 30, 2010, the Company’s disclosure controls and procedures were effective to provide reasonable assurance that information required to be disclosed by the Company in reports that it files or submits under the Exchange Act is recorded, processed, summarized and reported within the required time periods and that such information is accumulated and communicated to the Company’s management, including the President and Chief Executive Officer and its Chief Financial Officer and Treasurer, as appropriate to allow timely decisions regarding required disclosure.

Disclosure controls and procedures involve human diligence and compliance and are subject to lapses in judgment and breakdowns resulting from human failures. As a result, a control system, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Further, the design of a control system must reflect the fact that there are resource constraints and the benefits of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that all control issues and instances of fraud, if any, within the Company have been detected.

### Changes in Internal Controls

There has been no change in the Company’s internal control over financial reporting during the three months ended September 30, 2010, that has materially affected, or that is reasonably likely to materially affect, the Company’s internal control over financial reporting.

## Risk factors

As filed, 287 characters.

Information regarding risk factors appears in Item 2 “MD&A — Forward-Looking Statements,” and various risks faced by us are also discussed elsewhere in Item 2 “MD&A” of this Quarterly Report on Form 10-Q. In addition, risk factors are included in Part I, Item 1A of our Fiscal 2010 10-K.