# Kosmos Energy Ltd.: Form 10-Q for the period ended Jun 30, 2012

- Company: [Kosmos Energy Ltd.](/companies/kos.md) (CIK 1509991)
- Form: 10-Q
- Filed: 2012-08-06
- Accepted by EDGAR: Aug 6, 2012, 11:40 ET
- Period: 2012-06-30
- Accession: 0001104659-12-054467
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1509991/000110465912054467/a12-13962_110q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1509991/000110465912054467/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2012-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2012-04-01 to 2012-06-30 | $112.7m | us-gaap:Revenues |
| Revenue | 6 months, 2012-01-01 to 2012-06-30 | $229.2m | us-gaap:Revenues |
| Interest expense | 3 months, 2012-04-01 to 2012-06-30 | $10.4m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2012-01-01 to 2012-06-30 | $23.5m | us-gaap:InterestExpense |
| Income tax | 3 months, 2012-04-01 to 2012-06-30 | $22.5m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2012-01-01 to 2012-06-30 | $38.8m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2012-04-01 to 2012-06-30 | −$24.8m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2012-01-01 to 2012-06-30 | −$62.4m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2012-04-01 to 2012-06-30 | −$0.07 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2012-01-01 to 2012-06-30 | −$0.17 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2012-04-01 to 2012-06-30 | −$0.07 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2012-01-01 to 2012-06-30 | −$0.17 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2012-04-01 to 2012-06-30 | 370,720,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2012-01-01 to 2012-06-30 | 369,973,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2012-01-01 to 2012-06-30 | $160.7m | us-gaap:NetCashProvidedByUsedInOperatingActivitiesContinuingOperations |
| Share repurchases | 6 months, 2012-01-01 to 2012-06-30 | $8.4m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2012-06-30 | $630.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2012-06-30 | $938.7m | us-gaap:AssetsCurrent |
| Total assets | at 2012-06-30 | $2.46bn | us-gaap:Assets |
| Current liabilities | at 2012-06-30 | $248.1m | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2012-06-30 | $1.11bn | us-gaap:LongTermDebtNoncurrent |
| Shareholders' equity | at 2012-06-30 | $989.2m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 40,632 characters.

*The following discussion and analysis should be read in conjunction with our consolidated financial statements and notes thereto contained herein and our annual financial statements for the year ended December 31, 2011, included in our annual report on Form 10-K along with the section Management’s Discussion and Analysis of financial condition and Results of Operations contained in such annual report. Any terms used but not defined in the following discussion have the same meaning given to them in the annual report. Our discussion and analysis includes forward-looking information that involves risks and uncertainties and should be read in conjunction with “Risk Factors” under Item 1A of this report and in the annual report, along with “Forward-Looking Information” at the end of this section for information about the risks and uncertainties that could cause our actual results to be materially different than our forward-looking statements.*

### Overview

We are an independent oil and gas exploration and production company currently focused on frontier and emerging areas in Africa and South America. Our asset portfolio includes existing production, major discoveries and exploration prospects offshore Ghana, as well as exploration licenses with significant hydrocarbon potential offshore Mauritania, Morocco and Suriname and onshore Cameroon.

We were incorporated pursuant to the laws of Bermuda as Kosmos Energy Ltd. in January 2011 to become a holding company for Kosmos Energy Holdings. Pursuant to the terms of a corporate reorganization that was completed immediately prior to the closing of Kosmos Energy Ltd.’s IPO on May 16, 2011, all of the interests in Kosmos Energy Holdings were exchanged for newly issued common shares of Kosmos Energy Ltd. As a result, Kosmos Energy Holdings became wholly owned by Kosmos Energy Ltd.

### Recent Highlights

During the second quarter of 2012, we had one lifting of oil totaling 997 MBbl from our Jubilee Field production resulting in revenues of $112.2 million. Our average realized price per barrel was $112.60.

A total of 17 development wells have been drilled during the Jubilee Field Phase 1 development. The Jubilee Field Phase 1A PoD was approved by the Ministry of Energy and GNPC in January 2012. The Phase 1A PoD includes eight additional wells to be drilled beginning in 2012, including five production wells and three water injection wells.

#### Ghana — exploration and appraisal activity

In January 2012, the Ntomme-2A appraisal well confirmed a downdip extension of the Ntomme Field on the DT Block. The well encountered high-quality stacked reservoir sandstones. A drill stem test was performed on the well in May 2012, which successfully flowed oil from multiple zones in the reservoir and confirmed continuity with the Ntomme discovery well. Fluid samples recovered from the well indicate an oil gravity of approximately 35 degrees API.

In July 2012, the Wawa-1 exploration well made a hydrocarbon discovery on the DT Block. Analysis of well results, including wireline logs, reservoir pressures and fluid samples, indicated the well encountered gas-condensate and oil-bearing pay. Fluid samples recovered from the well indicate an oil gravity of between 38 and 44 degrees API.

The WCTP PA, which governs our activities related to the WCTP Block, has a duration of 30 years from its effective date (July 2004); however, in July 2011, at the end of the seven-year exploration phase, parts of the WCTP Block on which we had not declared a discovery area, were not in a development and production area or were not in the Jubilee Unit were subject to relinquishment (“WCTP Relinquishment Area”). Our existing discoveries within the WCTP Block have not been relinquished, as the WCTP PA remains in effect after the end of the exploration phase and these are Akasa, Banda, Mahogany and Teak. In addition, we have disputed the relinquishment of the area around the Cedrela prospect. In July 2011, immediately prior to Kosmos receiving the drilling rig from another operator, damage to the rig incurred during preparations to move the rig to the WCTP Block rendered the rig incapable of drilling the Cedrela-1 exploration well prior to the end of the WCTP exploration period on July 21, 2011. As a result of this unforeseen delay in the drilling of the Cedrela-1 exploration well, the Company, as Operator for the WCTP PA Block partners, delivered a Notice of Force Majeure. The Ministry of Energy and GNPC did not agree this event was Force Majeure. On August 24, 2011, we as Operator of the WCTP Block and on behalf of the WCTP PA Block partners, delivered a Notice of Dispute to the Ministry of Energy and GNPC as provided under the WCTP PA, which is the initial step in triggering the formal dispute resolution process under the WCTP PA with the Government of Ghana regarding our rights to drill the Cedrela-1 exploration well. This Notice of Dispute establishes a process for negotiation and consultation for a period of 30 days (or longer if mutually agreed) among senior representatives from the Ministry of Energy, GNPC and the WCTP Block partners to resolve the matter. The issue continues to be discussed in an effort to reach a mutually agreed upon resolution among the parties.

We and our WCTP Block partners have certain rights to negotiate a new petroleum contract with respect to the WCTP Relinquishment Area. We and our WCTP Block partners exercised such right in July 2010 and formally submitted a proposed new petroleum agreement for the WCTP Relinquishment Area in early 2011. We and our WCTP Block partners, the Ministry of Energy and GNPC have agreed such WCTP PA rights extend from July 21, 2011 until such time as either a new petroleum contract is negotiated and entered into with us or we decline to match a bona fide third party offer GNPC may receive for the WCTP Relinquishment Area.

In February 2012, we exercised a right under the existing joint operating agreement to acquire the 4.05% participating interest of Sabre in the DT Block. In May 2012, Kosmos and Sabre reached a mutual agreement to terminate this acquisition.

Drilling of the Teak-4A appraisal well was completed in May 2012. The well encountered non-commercial reservoirs and accordingly was plugged and abandoned. Total well related costs incurred from inception through June 30, 2012 of $15.8 million are included in exploration expenses in the accompanying consolidated statement of operations.

#### Mauritania

In April 2012, we completed negotiations with Mauritania’s Ministry of Petroleum, Energy and Mines and executed separate petroleum contracts covering Blocks C8, C12 and C13 offshore Mauritania. Kosmos is the operator and has a 90% participating interest in each of these blocks. The Government of Mauritania has a 10% carried interest during the exploration period and the option to participate in any discovery on these blocks, and if it elects to exercise such option its participation interest would be between 10% and 14%. The first phase of the exploration period of the petroleum contract covering each of Blocks C8, C12 and C13 is four years in duration. These contracts were officially gazetted by the Government of Mauritania on June 15, 2012, thereby establishing the effective date for the petroleum contracts.

Our blocks in Mauritania cover 6.7 million acres (27,200 square kilometers) and are located within the western margin of the proven Mauritanian salt basin, on the Atlantic passive margin. The source rock in the basin is the same age and type as the source rock generated by the petroleum system in the Jubilee Field. Additionally, we believe the play model in the basin is similar to the play model found in the Jubilee Field. A petroleum system in Mauritania has been proven by the presence of offshore producing fields in adjacent blocks to those we hold.

We have an estimated $12.6 million in work commitments to perform exploration activities on our petroleum contracts in Mauritania. We plan to acquire seismic data in our blocks offshore Mauritania in 2013 to further define prospectivity on the blocks.

#### Morocco

In May 2012, we received joint ministerial approval from the Moroccan government to acquire an additional 18.75% participating interest in the Foum Assaka Offshore Block from Pathfinder Hydrocarbon Ventures Ltd., one of our block partners. Certain governmental approvals and processes are still required to be completed before this acquisition can be closed. After completing the acquisition, our participating interest in the Foum Assaka Offshore Block will be 56.25%.

#### Suriname

In May 2012, Kosmos entered into an agreement with Chevron Global Energy Inc. (“Chevron”) under which Kosmos will assign half of its interest in Block 42 and Block 45, offshore Suriname, to Chevron. Upon receipt of approval from the Suriname government and the closing of the agreement, each party will have a 50% working interest in Block 42 and Block 45.

### Results of Operations

Certain operating results and statistics for the comparative second quarters of 2012 and 2011 are included in the following table:

*(In thousands, except per barrel data)*

| Sales volumes: | Three Months Ended June 30, 2012 | 2011 | Six Months Ended June 30, 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| MBbl | 997 | 996 | 1,928 | 1,985 |
| Revenues: |  |  |  |  |
| Oil sales | $112,214 | $124,083 | $227,985 | $216,652 |
| Average sales price per Bbl | 112.60 | 124.62 | 118.25 | 109.14 |
| Costs: |  |  |  |  |
| Oil production, excluding workovers | $9,333 | $14,301 | $16,659 | $34,296 |
| Oil production, workovers | 10,259 | — | 10,259 | — |
| Total oil production costs | 19,592 | 14,301 | 26,918 | 34,296 |
| Depletion | 31,288 | 21,711 | 61,343 | 44,096 |
| Average cost per Bbl: |  |  |  |  |
| Oil production, excluding workovers | 9.37 | 14.36 | 8.64 | 17.28 |
| Oil production, workovers | 10.29 | — | 5.32 | — |
| Total oil production costs | 19.66 | 14.36 | 13.96 | 17.28 |
| Depletion | 31.39 | 21.80 | 31.82 | 22.21 |
| Oil production cost and depletion costs | $51.05 | $36.16 | $45.78 | $39.49 |

The following table shows the number of wells in the process of drilling or in active completion stages, and the number of wells suspended or awaiting completion as of June 30, 2012:

| Ghana | Wells in the Process of Drilling or in Active Completion Exploration Gross | Net | Development Gross | Net | Wells Suspended or Awaiting Completion Exploration Gross | Net | Development Gross | Net |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| West Cape Three Points | — | — | — | — | 8 | 2.47 | — | — |
| Deepwater Tano | 1 | 0.18 | — | — | 10 | 1.80 | — | — |
| Jubilee Unit | — | — | 1 | 0.24 | — | — | 3 | 0.72 |

28

The discussion of the results of operations and the period-to-period comparisons presented below analyze our historical results. The following discussion may not be indicative of future results.

### Three months ended June 30, 2012 compared to three months ended June 30, 2011

*(In thousands)*

| Revenues and other income: | Three Months Ended June 30, 2012 | 2011 | Increase (Decrease) |
| --- | ---: | ---: | ---: |
| Oil and gas revenue | $112,214 | $124,083 | $(11,869) |
| Interest income | 282 | 2,613 | (2,331) |
| Other income | 175 | 157 | 18 |
| Total revenues and other income | 112,671 | 126,853 | (14,182) |
| Costs and expenses: |  |  |  |
| Oil and gas production | 19,592 | 14,301 | 5,291 |
| Exploration expenses | 16,901 | 85,220 | (68,319) |
| General and administrative | 34,799 | 19,760 | 15,039 |
| Depletion and depreciation | 32,999 | 22,869 | 10,130 |
| Amortization—deferred financing costs | 2,194 | 2,194 | — |
| Interest expense | 10,446 | 18,400 | (7,954) |
| Derivatives, net | (1,982) | 1,363 | (3,345) |
| Doubtful accounts expense | — | (39,782) | 39,782 |
| Other expenses, net | 44 | 84 | (40) |
| Total costs and expenses | 114,993 | 124,409 | (9,416) |
| Income (loss) before income taxes | (2,322) | 2,444 | (4,766) |
| Income tax expense | 22,521 | 11,535 | 10,986 |
| Net loss | $(24,843) | $(9,091) | $(15,752) |

*Oil and gas revenue.* Oil and gas revenue decreased $11.9 million during the three months ended June 30, 2012, as compared with the three months ended June 30, 2011 due to a lower average realized price per barrel.

*Oil and gas production.* Oil and gas production costs increased $5.3 million during the three months ended June 30, 2012, as compared with the three months ended June 30, 2011 primarily due to workover costs for acid stimulations on three Jubilee Field wells, offset by a decrease due to the purchase of the FPSO in December 2011. During the three months ended June 30, 2012, the FPSO costs are being capitalized and expensed as depletion. Prior to the acquisition of the FPSO, we leased the FPSO from a third party and the lease costs were included in oil and gas production costs.

*Exploration expenses.* Exploration expenses decreased $68.3 million during the three months ended June 30, 2012, as compared with the three months ended June 30, 2011. During the three months ended June 30, 2012, we incurred $10.1 million of unsuccessful well costs related to the Ghana Teak-4A appraisal well. During the three months ended June 30, 2011, we incurred $79.9 million of unsuccessful well costs, primarily related to the Cameroon N’gata-1, Cameroon Mombe-1, Ghana Banda-1 and Ghana Odum exploration wells.

*General and administrative.* General and administrative costs increased $15.0 million during the three months ended June 30, 2012, as compared with the three months ended June 30, 2011, primarily due to increases in non-cash expenses for equity-based compensation and an increase in staffing. Total non-cash general and administrative costs were $17.6 million and $8.7 million for the three months ended June 30, 2012 and 2011, respectively.

*Depletion and depreciation.* Depletion and depreciation increased $10.1 million during the three months ended June 30, 2012, as compared with the three months ended June 30, 2011, primarily due to an increase in the cost basis of our oil and gas properties related to the purchase of the FPSO and an increase in the number of completed wells.

*Interest expense.* Interest expense decreased $8.0 million during the three months ended June 30, 2012, as compared with the three months ended June 30, 2011, primarily due to a decrease in the unrealized loss on the interest rate derivative instruments related to changes in fair value and a lower weighted average interest rate on our commercial debt facility (the “Facility”) for the three months ended June 30, 2012.

*Doubtful accounts expense.* During the second quarter of 2011, we released a $39.8 million allowance for doubtful accounts, related to a receivable in default. We received the full amount of the receivable during the third quarter of 2011.

*Income tax expense.* Income tax expense increased $11.0 million during the three months ended June 30, 2012, as compared to the three months ended June 30, 2011 due to an increase in net income from our Ghanaian and U.S. subsidiaries .

### Six months ended June 30, 2012 compared to six months ended June 30, 2011

*(In thousands)*

| Revenues and other income: | Six months Ended June 30, 2012 | 2011 | Increase (Decrease) |
| --- | ---: | ---: | ---: |
| Oil and gas revenue | $227,985 | $216,652 | $11,333 |
| Interest income | 1,028 | 4,967 | (3,939) |
| Other income | 205 | 644 | (439) |
| Total revenues and other income | 229,218 | 222,263 | 6,955 |
| Costs and expenses: |  |  |  |
| Oil and gas production | 26,918 | 34,296 | (7,378) |
| Exploration expenses | 56,545 | 93,652 | (37,107) |
| General and administrative | 74,122 | 33,047 | 41,075 |
| Depletion and depreciation | 64,648 | 46,367 | 18,281 |
| Amortization—deferred financing costs | 4,388 | 11,805 | (7,417) |
| Interest expense | 23,504 | 38,658 | (15,154) |
| Derivatives, net | 1,878 | 10,234 | (8,356) |
| Loss on extinguishment of debt | — | 59,643 | (59,643) |
| Doubtful accounts expense | — | (39,782) | 39,782 |
| Other expenses, net | 792 | 61 | 731 |
| Total costs and expenses | 252,795 | 287,981 | (35,186) |
| Income (loss) before income taxes | (23,577) | (65,718) | 42,141 |
| Income tax expense (benefit) | 38,807 | (1,976) | 40,783 |
| Net loss | $(62,384) | $(63,742) | $1,358 |

*Oil and gas revenue.* Oil and gas revenue increased $11.3 million during the six months ended June 30, 2012, as compared with the six months ended June 30, 2011 primarily due to a higher average realized price per barrel during the six months ended

June 30, 2012.

*Oil and gas production.* Oil and gas production costs decreased $7.4 million during the six months ended June 30, 2012, as compared with the six months ended June 30, 2011 primarily due to a decrease related to the purchase of the FPSO in December 2011 partially offset by workover costs for acid stimulations on three Jubilee Field wells, During the six months ended June 30, 2012, the FPSO costs are being capitalized and expensed as depletion. Prior to the acquisition of the FPSO, we leased the FPSO from a third party and the lease costs were included in oil and gas production costs.

*Exploration expenses.* Exploration expenses decreased $37.1 million during the six months ended June 30, 2012, as compared with the six months ended June 30, 2011. During the six months ended June 30, 2012, we incurred $33.4 million for seismic costs for Morocco, Ghana and Cameroon and $19.2 million of unsuccessful well costs, primarily related to the Ghana Teak-4A appraisal well. During the six months ended June 30, 2011, the Company incurred $83.3 million of unsuccessful well costs primarily related to the Cameroon N’gata-1, Cameroon Mombe-1, Ghana Makore-1, Ghana Banda-1 and Ghana Odum exploration wells and $10.2 million for seismic costs primarily for Ghana, Cameroon and new ventures.

*General and administrative.* General and administrative costs increased $41.1 million during the six months ended June 30, 2012, as compared with the six months ended June 30, 2011, due to increases in non-cash expenses of $29.7 million for equity-based compensation and an increase in staffing. Total non-cash general and administrative costs were $38.9 million and $9.1 million for the six months ended June 30, 2012 and 2011, respectively.

*Depletion and depreciation.* Depletion and depreciation increased $18.3 million during the six months ended June 30, 2012, as compared with the six months ended June 30, 2011, primarily due to an increase in the cost basis of our oil and gas properties related to the purchase of the FPSO and an increase in the number of completed wells.

*Amortization—deferred financing costs* and *Loss on extinguishment of debt.* In March 2011, we refinanced our existing commercial debt facilities. As part of the transaction, we incurred approximately $52.3 million of deferred financing costs, in addition to our existing unamortized deferred financing costs of $68.6 million. As a result of the transaction, we recorded a $59.6 million loss on the extinguishment of debt. The remaining costs were capitalized and are being amortized over the term of the Facility entered into in March 2011. The related amortization of deferred financing costs decreased by $7.4 million during the six months ended June 30, 2012, as compared to the six months ended June 30, 2011, due to the decrease in capitalized deferred financing costs and the longer term associated with the new Facility.

*Interest expense.* Interest expense decreased $15.2 million during the six months ended June 30, 2012, as compared with the six months ended June 30, 2011, primarily due to a decrease in the unrealized loss on the interest rate derivative instruments related to changes in fair value and a lower weighted average interest rate on the Facility during the six months ended June 30, 2012.

*Income tax expense (benefit).* Income tax expense increased $40.8 million during the six months ended June 30, 2012, as compared to the six months ended June 30, 2011 due to an increase in net income from our Ghanaian and U.S. subsidiaries.

### Liquidity and Capital Resources

We are actively engaged in an ongoing process to anticipate and meet our funding requirements related to exploring for and developing oil and natural gas resources in Africa and South America. We have historically secured funding from equity commitments and commercial debt facilities to meet our ongoing liquidity requirements. In addition, we received our first oil revenues in January 2011 from Jubilee Field production and the cash flows generated from our operating activities may provide an additional source of future funding. Additionally, existing cash on hand will be utilized as a source to fund our operating and investing activities.

#### Significant Sources of Capital

In March 2011, the Company secured a $2.0 billion Facility from a number of financial institutions and extinguished the then existing commercial debt facilities. The Facility supports our oil and gas exploration, appraisal and development programs and corporate activities. The total loan commitments of the Facility may be increased up to a maximum of $3.0 billion if the lenders increase their commitments or if loan commitments from new financial institutions are added. In all cases, however, the availability under the Facility is limited by borrowing base capacity, which is redetermined semi-annually. The International Finance Corporation entered the Facility in February 2012. The terms and conditions of the Facility remained consistent with the original terms and conditions, and the total commitment under the Facility remained unchanged.

As of June 30, 2012, borrowings under the Facility totaled $1.1 billion. As of June 30, 2012, the undrawn availability under the Facility was an additional $50.0 million.

The interest is the aggregate of the applicable margin (3.25% to 4.75%, depending on the amount of the Facility that is being utilized and the length of time that has passed from the date the Facility was entered into); LIBOR; and mandatory cost (if any, as defined in the Facility). Interest is payable on the last day of each interest period (and, if the interest period is longer than six months, on the dates falling at six-month intervals after the first day of the interest period). Kosmos pays commitment fees on the undrawn and unavailable portion of the total commitments. Commitment fees for the lenders are equal to 40% per annum of the then-applicable respective margin when a commitment is available for utilization and, equal to 20% per annum of the then-applicable respective margin when a commitment is not available for utilization. The Company recognizes interest expense in accordance with ASC 835—Interest, which requires interest expense to be recognized using the effective interest method. We determined the effective interest rate based on the estimated level of borrowings under the Facility. Accordingly, we recognized interest expense in excess of interest currently payable of $1.3 million and $1.2 million during the three months ended June 30, 2012 and 2011, respectively, and $3.1 million and $1.2 million during the six months ended June 30, 2012 and 2011, respectively.

The Facility provides a revolving-credit and letter of credit facility for an availability period that expires on May 15, 2014 (in the case of the revolving-credit facility) and on the final maturity date (in the case of the letter of credit facility). The available facility amount is subject to borrowing base constraints and also is constrained by the amortization schedule (once repayments under the Facility begin). As of May 15, 2014, outstanding borrowings will be subject to an amortization schedule. The first required payment could be as early as June 15, 2014, subject to the level of outstanding borrowings. The Facility has a final maturity date of March 29, 2018.

Kosmos has the right to cancel all the undrawn commitments under the Facility. The amount of funds available to be borrowed under the Facility, also known as the borrowing base amount, was previously determined each year on June 15 and December 15 as part of a forecast that is prepared by and agreed to by Kosmos and the Technical and Modeling Banks. In April 2012, the lenders agreed to change the borrowing base determination dates to April 15 and October 15. The formula to calculate the borrowing base amount is based, in part, on the sum of the net present values of net cash flows and relevant capital expenditures, reduced by certain ratios.

If an event of default exists under the Facility, the lenders can accelerate the maturity and exercise other rights and remedies, including the enforcement of security granted pursuant to the Facility over certain assets held by us.

We were in compliance with the financial covenants contained in the Facility as of April 19, 2012, our most recent forecast date, which requires the maintenance of:

- the field life cover ratio, not less than 1.30x; and
- the loan life cover ratio, not less than 1.10x.

The “field life cover ratio” is broadly defined, for each applicable forecast period, as the ratio of (x) net present value of net cash flow through the depletion of the Jubilee Field plus the net present value of capital expenditures incurred in relation to the Jubilee Field and certain other fields in Ghana, to (y) the aggregate loan amounts outstanding under the Facility. The “loan life cover ratio” is broadly defined, for each applicable forecast period, as the ratio of (x) net present value of net cash flow through the final maturity date of the Facility plus the net present value of capital expenditures incurred in relation to the Jubilee Field and certain other fields in Ghana, to (y) the aggregate loan amounts outstanding under the Facility.

#### Capital Expenditures and Investments

We expect to incur substantial costs as we continue to develop our oil and natural gas prospects and as we:

- complete our 2012 exploration and appraisal drilling program in our license areas;
- develop our discoveries that we determine to be commercially viable;
- purchase and analyze seismic and other geological and geophysical data to identify future prospects; and
- invest in additional oil and natural gas leases and licenses and potentially make additional acquisitions.

We have relied on a number of assumptions in budgeting for our future activities. These include the number of wells we plan to drill, our working interests in our prospects, the costs involved in developing or participating in the development of a prospect, the timing of third-party projects, and the availability of suitable equipment and qualified personnel. These assumptions are inherently subject to significant business, political, economic, regulatory, environmental and competitive uncertainties, contingencies and risks, all of which are difficult to predict and many of which are beyond our control. We may need to raise additional funds more quickly if one or more of our assumptions proves to be incorrect or if we choose to expand our hydrocarbon asset acquisition, exploration, appraisal or development efforts more rapidly than we presently anticipate. We may decide to raise additional funds before we need them if the conditions for raising capital are favorable. We may seek to sell equity or debt securities or obtain additional bank credit facilities. The sale of equity securities could result in dilution to our shareholders. The incurrence of additional indebtedness could result in increased fixed obligations and additional covenants that could restrict our operations.

#### 2012 Capital Program

We reduced our estimate for the 2012 capital program to approximately $500 million for the year ending December 31, 2012. With the success of the Company’s acid treatment program at Jubilee, we do not anticipate performing any further sidetrack operations in the current year. The removal of these sidetracks, along with updated appraisal plans on the Company’s WCTP Block, accounts for the reduction in estimated capital expenditures. The 2012 capital expenditure budget consists of:

- approximately 45% for developmental related expenditures; and
- approximately 55% for exploration and appraisal related expenditures, including new ventures exploration and expanding our license portfolio (including geological and geophysical expenses).

The ultimate amount of capital we will spend may fluctuate materially based on market conditions and the success of our drilling results. Our future financial condition and liquidity will be impacted by, among other factors, our level of production of oil and natural gas and the prices we receive from the sale of these commodities, the success of our exploration and appraisal drilling program, the number of commercially viable oil and natural gas discoveries made and the quantities of oil and natural gas discovered, the speed with which we can bring such discoveries to production, and the actual cost of exploration, appraisal and development of our oil and natural gas assets.

The following table presents our liquidity and financial position as of June 30, 2012:

*(In thousands)*

|  | June 30, 2012 |
| --- | ---: |
| Cash | $629,951 |
| Drawings under the commercial debt facility | 1,110,000 |
| Net debt | 480,049 |
| Total of unused borrowing base | 50,000 |
| Unused borrowing base plus cash | 679,951 |

### Cash Flows

*(In thousands)*

| Net cash provided by (used in): | Six months Ended June 30, 2012 | 2011 |
| --- | ---: | ---: |
| Operating activities | $160,685 | $54,499 |
| Investing activities | (194,194) | (119,543) |
| Financing activities | (9,632) | 782,908 |

***Operating activities.*** Net cash provided by operating activities for the six months ended June 30, 2012 was $160.7 million, compared with net cash provided in operating activities for the six months ended June 30, 2011 of $54.5 million. The increase in cash provided by operating activities in the six months ended June 30, 2012 compared with the same period in 2011 was primarily due to timing of cash receipts for oil sales and other working capital changes.

***Investing activities.*** Net cash used in investing activities for the six months ended June 30, 2012 was $194.2 million, compared with net cash used in investing activities for the six months ended June 30, 2011 of $119.5 million. The increase in cash used in investing activities in the six months ended June 30, 2012 compared with the same period in 2011 was primarily attributable to changes in restricted cash, notes receivable and expenditures for oil and gas assets primarily in Ghana for development activities. During the six months ended June 30, 2011, we released $112.0 million of associated restricted cash and set aside $27.7 million primarily related to requirements under the Facility.

***Financing activities.*** Net cash used by financing activities for the six months ended June 30, 2012 was $9.6 million, compared with net cash provided by financing activities for the six months ended June 30, 2011 of $782.9 million. The decrease in cash provided by financing activities in the six months ended June 30, 2012 compared with the same period in 2011 was primarily due to lower net borrowings on the Facility of $255.0 million offset by a decrease of $51.2 million in cash used for deferred financing costs. Additionally for the six months ended June 30, 2011, we received net proceeds from the IPO of $580.4 million

### Contractual Obligations

The following table summarizes by period the payments due for our estimated contractual obligations as of June 30, 2012:

*(In thousands)*

|  | Payments Due By Year(3) Total | 2012(4) | 2013 | 2014 | 2015 | 2016 | Thereafter |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Commercial debt facility(1) | $1,110,000 | $— | $— | $— | $110,000 | $444,444 | $555,556 |
| Interest payments on commercial debt facility(2) | 263,962 | 23,005 | 47,039 | 50,925 | 54,888 | 55,336 | 32,769 |
| Operating leases | 21,797 | 234 | 2,821 | 2,921 | 3,022 | 3,122 | 9,677 |

(1) The amounts included in the table represent principal maturities only. The scheduled maturities of debt are based on the level of borrowings and the available borrowing base as of June 30, 2012. Any increases or decreases in the level of borrowings or decreases in the available borrowing base would impact the scheduled maturities of debt during the next five years and thereafter.

(2) Based on outstanding borrowings as noted in (1) above and the LIBOR yield curve at the reporting date.

(3) Does not include purchase commitments for jointly owned fields and facilities where we are not the operator and excludes $16.7 million of commitments for exploration activities in our petroleum contracts. Does not include any well commitments we may have under our petroleum contracts.

(4) Represents payments for the period July 1, 2012 through December 31, 2012.

The following table presents maturities by expected maturity dates under the Facility, the weighted average interest rates expected to be paid on the Facility given current contractual terms and market conditions, and the debt’s estimated fair value. Weighted-average interest rates are based on implied forward rates in the yield curve at the reporting date. This table does not take into account amortization of deferred financing costs.

*(In thousands, except percentages)*

| Variable rate debt: | Year Ending December 31, July 1 Through December 31, 2012 | 2013 | 2014 | 2015 | 2016 | Thereafter | Asset (Liability) Fair Value at June 30, 2012 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Commercial debt facility maturities | $— | $— | $— | $110,000 | $444,444 | $555,556 | $(1,110,000) |
| Weighted average interest rate | 4.11% | 4.24% | 4.59% | 4.94% | 6.23% | 7.00% |  |
| Interest rate swaps: |  |  |  |  |  |  |  |
| Notional debt amount(1) | $114,896 | $91,683 | $47,033 | $16,875 | $6,250 | $— | $(3,037) |
| Fixed rate payable | 2.22% | 2.22% | 2.22% | 2.22% | 2.22% |  |  |
| Variable rate receivable(2) | 0.73% | 0.74% | 0.80% | 1.11% | 1.48% |  |  |
| Notional debt amount(1) | $114,896 | $91,683 | $47,033 | $16,875 | $6,250 | $— | $(3,240) |
| Fixed rate payable | 2.31% | 2.31% | 2.31% | 2.31% | 2.31% |  |  |
| Variable rate receivable(2) | 0.73% | 0.74% | 0.80% | 1.11% | 1.48% |  |  |
| Notional debt amount(1)(3) | $49,751 | $19,057 | $1,868 | $— | $— | $— | $(108) |
| Fixed rate payable | 0.98% | 0.98% | 0.98% |  |  |  |  |
| Variable rate receivable(2) | 0.73% | 0.74% | 0.76% |  |  |  |  |
| Notional debt amount(1)(4) | $26,877 | $24,680 | $38,434 | $23,137 | $— | $— | $(479) |
| Fixed rate payable | 1.34% | 1.34% | 1.34% | 1.34% |  |  |  |
| Variable rate receivable(2) | 0.73% | 0.74% | 0.80% | 1.24% |  |  |  |

(1) Represents weighted average notional contract amounts of interest rate derivatives.

(2) Based on implied forward rates in the yield curve at the reporting date.

(3) For 2014, represents notional amount from January — June 2014.

(4) For 2015, represents notional amount from January — June 2015.

### Off-Balance Sheet Arrangements

As of June 30, 2012, we did not have any material off-balance sheet arrangements.

### Critical Accounting Policies

We consider accounting policies related to our revenue recognition, exploration and development costs, receivables, income taxes, derivatives and hedging activities, estimates of proved oil and natural gas reserves, asset retirement obligations and impairment of long-lived assets as critical accounting policies. The policies include significant estimates made by management using information available at the time the estimates are made. However, these estimates could change materially if different information or assumptions were used. These policies are summarized in “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations section in our annual report on Form 10-K, for the year ended December 31, 2011.

### Cautionary Note Regarding Forward-looking Statements

This quarterly report on Form 10-Q contains estimates and forward-looking statements, principally in “Management’s Discussion and Analysis of Financial Condition and Results of Operations.” Our estimates and forward-looking statements are mainly based on our current expectations and estimates of future events and trends, which affect or may affect our businesses and operations. Although we believe that these estimates and forward-looking statements are based upon reasonable assumptions, they are subject to several risks and uncertainties and are made in light of information currently available to us. Many important factors, in addition to the factors described in our quarterly report on Form 10-Q and our annual report on Form 10-K, may adversely affect our results as indicated in forward-looking statements. You should read this quarterly report on Form 10-Q, the annual report on Form 10-K and the documents that we have filed with the Securities and Exchange Commission completely and with the understanding that our actual future results may be materially different from what we expect. Our estimates and forward-looking statements may be influenced by the following factors, among others:

- our ability to find, acquire or gain access to other discoveries and prospects and to successfully develop our current discoveries and prospects;
- uncertainties inherent in making estimates of our oil and natural gas data;
- the successful implementation of our and our block partners’ prospect discovery and development and drilling plans;
- projected and targeted capital expenditures and other costs, commitments and revenues;
- termination of or intervention in concessions, rights or authorizations granted by the governments of Ghana, Cameroon, Mauritania, Morocco or Suriname (or their respective national oil companies) or any other federal, state or local governments, to us;
- our dependence on our key management personnel and our ability to attract and retain qualified technical personnel;
- the ability to obtain financing and to comply with the terms under which such financing may be available;
- the volatility of oil and natural gas prices;
- the availability, cost, function and reliability of developing appropriate infrastructure around and transportation to our discoveries and prospects;
- the availability and cost of drilling rigs, production equipment, supplies, personnel and oilfield services;
- other competitive pressures;
- potential liabilities inherent in oil and natural gas operations, including drilling risks and other operational and environmental hazards;
- current and future government regulation of the oil and gas industry;
- cost of compliance, and our and our partners ability to comply, with laws and regulations;
- changes in environmental, health and safety or climate change laws, greenhouse gas regulation or the implementation, or interpretation, of those laws and regulations;
- environmental liabilities;
- geological, reservoir, technical, drilling, production and processing problems;
- military operations, civil unrest, terrorist acts, wars or embargoes;
- the cost and availability of adequate insurance coverage;
- our vulnerability to severe weather events; and
- other risk factors discussed in the “Item 1A. Risk Factors” section of this quarterly report on Form 10-Q and our annual report on Form 10-K.

The words “believe,” “may,” “will,” “aim,” “estimate,” “continue,” “anticipate,” “intend,” “expect,” “plan” and similar words are intended to identify estimates and forward-looking statements. Estimates and forward-looking statements speak only as of the date they were made, and, except to the extent required by law, we undertake no obligation to update or to review any estimate and/or forward-looking statement because of new information, future events or other factors. Estimates and forward-looking statements involve risks and uncertainties and are not guarantees of future performance. As a result of the risks and uncertainties described above, the estimates and forward-looking statements discussed in this Quarterly Report on Form 10-Q might not occur and our future results and our performance may differ materially from those expressed in these forward-looking statements due to, including, but not limited to, the factors mentioned above. Because of these uncertainties, you should not place undue reliance on these forward-looking statements.

## Market risk

As filed, 4,482 characters.

The primary objective of the following information is to provide forward-looking quantitative and qualitative information about our potential exposure to market risks. The term “market risks” as it relates to our currently anticipated transactions refers to the risk of loss arising from changes in commodity prices and interest rates. These disclosures are not meant to be precise indicators of expected future losses, but rather they are indicators of reasonably possible losses. This forward-looking information provides indicators of how we view and manage ongoing market risk exposures. We enter into market-risk sensitive instruments for purposes other than speculation.

The following table reconciles the changes that occurred in fair values of our open derivative contracts during the six months ending June 30, 2012:

*(In thousands)*

|  | Derivative Contracts Assets (Liabilities) Commodities | Interest Rates | Total |
| --- | ---: | ---: | ---: |
| Fair value of contracts outstanding as of December 31, 2011 | $(24,760) | $(8,074) | $(32,834) |
| Changes in contract fair value | (1,878) | (1,435) | (3,313) |
| Contract maturities (settlements) | 8,163 | 2,645 | 10,808 |
| Fair value of contracts outstanding as of June 30, 2012 | $(18,475) | $(6,864) | $(25,339) |

### Commodity Derivative Instruments

We enter into various oil derivative contracts to mitigate our exposure to commodity price risk associated with anticipated future oil production. These contracts currently consist of purchased puts and swaps with calls.

We manage and control market and counterparty credit risk in accordance with policies and guidelines approved by the Kosmos Board of Directors. In accordance with these policies and guidelines, we determine the appropriate timing and extent of derivative transactions. We attempt to minimize credit risk exposure to counterparties through formal credit policies, monitoring procedures and diversification. See Note 10—Derivative Financial Instruments in our consolidated financial statements for a description of the accounting procedures we follow relative to our derivative financial instruments.

### Commodity Price Sensitivity

The following table provides information about our oil derivative financial instruments that were sensitive to changes in oil prices as of June 30, 2012:

| Term 2012: | Type of Contract | Bbls per day | Weighted Average Price per Bbl Deferred Premium | Puts | Swaps | Calls | Asset(Liability) Fair Value at June 30, 2012 (1)(2) |
| --- | --- | ---: | ---: | ---: | ---: | ---: | ---: |
| July - December | Purchased puts | 4,739 | $6.79 | $61.56 | $— | $— | $(5,508) |
| August - December | Swaps with calls | 6,536 | — | — | 97.21 | 110.00 | 1,512 |
| 2013(3): |  |  |  |  |  |  |  |
| January - December | Purchased puts | 2,515 | $7.32 | $61.73 | $— | $— | $(5,474) |

(1) Fair values are based on the average forward Dated Brent oil prices on June 30, 2012 which by year are: 2012 - $97.64; and 2013 - $97.42. These fair values are subject to changes in the underlying commodity price. The average forward Dated Brent oil prices based on July 31, 2012 market quotes by year are: 2012 - $103.67 and 2013 - $101.04.

(2) Excludes $9.2 million of cash settlements made on our purchased puts and compound options which were settled in the month subsequent to period end.

(3) In July 2012, we entered into three-way collar contracts for 1.5 million barrels from January 2013 through December 2013 with a floor price of $95.00 per Bbl, a ceiling price of $105.00 per Bbl and a call price of $125.00 per Bbl. The three-way collar contracts are indexed to Dated Brent pricing and have a weighted average deferred premium of $4.82 per Bbl.

### Interest Rate Sensitivity

At June 30, 2012, we had indebtedness outstanding under our Facility of $1.1 billion, of which $803.6 million bore interest at floating rates. The weighted average annual interest rate incurred on this indebtedness for the six months ended June 30, 2012, was approximately 4.1%. If LIBOR increased 10% at this level of floating rate debt, we would pay an additional $0.2 million in interest expense per year on our Facility.

As of June 30, 2012, the fair market value of our interest rate swaps was a net liability of approximately $6.9 million. If LIBOR increased 10%, we estimate the liability would decrease to approximately $6.4 million, and if LIBOR decreased 10%, we estimate the liability would increase to approximately $7.3 million.

## Controls and procedures

As filed, 2,096 characters.

*Evaluation of Disclosure Controls and Procedures.* As of the end of the period covered by this report, an evaluation of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as defined in Rule 13a-15(e) under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) was performed under the supervision and with the participation of the Company’s management, including our Chief Executive Officer and Chief Financial Officer. Based on that evaluation, the Company’s Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective as of June 30, 2012.

For the quarter ended December 31, 2011, management determined that a material weakness existed in our internal controls over financial reporting because the Company did not maintain effective controls over the determination and reporting of the provision for income taxes. Specifically, management did not perform a sufficiently precise review to ensure the completeness and accuracy of the Company’s calculation of its income tax provision related to our treatment of unrealized derivative losses. Management has implemented remediation steps to address the material weakness and to improve our internal control over financial reporting. Based on the remediation steps taken, management believes that the material weakness identified above no longer exists.

*Evaluation of Changes in Internal Control over Financial Reporting.* Except as noted above, there were no changes in our internal controls over financial reporting during our most recent fiscal quarter that have materially affected, or are reasonably likely to materially affect, our internal controls over financial reporting. We have begun the process of documenting, reviewing and, as appropriate, improving our internal controls and procedures in anticipation of becoming subject to the SEC rules concerning internal control over financial reporting, which take effect beginning with the filing of our second annual report on Form 10-K due in March 2013.

## Risk factors

As filed, 1,525 characters.

The risk factor below supplements the risks discussed in the “Item 1A. Risk Factors” section of our annual report on Form 10-K.

*We may be required to obtain third-party consents and/or complete certain governmental processes in order to complete the acquisition or disposal of blocks and licenses.*

The acquisition of blocks and licenses by us or those we choose to sell such interests to may require third party consent, including from applicable national oil companies and government, regulatory or legislative authorities. In addition, certain governmental processes may be required to be completed in order for these acquisitions or dispositions to be finalized. We may not be able to commence exploration, development and production operations on any blocks or licenses (or similar interests) we have agreed to acquire, and may not be able to receive payment on any blocks or licenses (or similar interests) we have agreed to dispose of, until all such consents are received and governmental processes are completed. Furthermore, any delays in completing these requirements may affect our exploration timetable or financial condition. Upon entering into any agreement to complete a prospective acquisition or disposition transaction that is subject to third-party consent and/or the completion of governmental process, no assurance can be given that these consents will be obtained and/or these processes will be completed, and accordingly that such prospective transactions will close on a timely basis or otherwise.

Filed Aug 6, 2012.