# Tutor Perini Corp: Form 10-Q for the period ended Mar 31, 2013

- Company: [Tutor Perini Corp](/companies/tpc.md) (CIK 77543)
- Form: 10-Q
- Filed: 2013-05-02
- Accepted by EDGAR: May 1, 2013, 18:45 ET
- Period: 2013-03-31
- Accession: 0001104659-13-036099
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/77543/000110465913036099/a13-9615_110q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/77543/000110465913036099/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2013-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Gross profit | 3 months, 2013-01-01 to 2013-03-31 | $100.4m | us-gaap:GrossProfit |
| Operating income | 3 months, 2013-01-01 to 2013-03-31 | $36.1m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2013-01-01 to 2013-03-31 | $11.3m | us-gaap:InterestExpense |
| Income tax | 3 months, 2013-01-01 to 2013-03-31 | $9.1m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2013-01-01 to 2013-03-31 | $14.8m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2013-01-01 to 2013-03-31 | $0.31 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2013-01-01 to 2013-03-31 | $0.31 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2013-01-01 to 2013-03-31 | 48,513,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2013-01-01 to 2013-03-31 | −$84.5m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2013-01-01 to 2013-03-31 | $12.2m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2013-03-31 | $132.3m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2013-03-31 | $2.07bn | us-gaap:AssetsCurrent |
| Total assets | at 2013-03-31 | $3.39bn | us-gaap:Assets |
| Current liabilities | at 2013-03-31 | $1.24bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2013-03-31 | $2.23bn | us-gaap:Liabilities |
| Long-term debt | at 2013-03-31 | $737.1m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2013-03-31 | $67.3m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2013-03-31 | $1.16bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 36,048 characters.

The following discusses our financial position at March 31, 2013, and the results of our operations for the three months ended March 31, 2013 and should be read in conjunction with: (1) the unaudited consolidated condensed financial statements and notes contained herein, and (2) the audited consolidated financial statements and accompanying notes to our Annual Report on Form 10-K for the fiscal year ended December 31, 2012.

### Overview

We were incorporated in 1918 as a successor to businesses that had been engaged in providing construction services since 1894. We provide diversified general contracting, construction management and design-build services to private customers and public agencies throughout the world. Our construction business is conducted through four basic segments or operations: Civil, Building, Specialty Contractors and Management Services. Our Civil segment specializes in public works construction and the repair, replacement and reconstruction of infrastructure, including highways, bridges, mass transit systems and water and wastewater treatment facilities, primarily in the western, northeastern and mid-Atlantic United States. Our Building segment has significant experience providing services to a number of specialized building markets, including the hospitality and gaming, transportation, healthcare, municipal offices, sports and entertainment, educational, correctional facilities, biotech, pharmaceutical and high-tech markets. Our Specialty Contractors segment specializes in plumbing, HVAC, electrical, mechanical, and pneumatically placed concrete for a full range of civil, building and management services construction projects in the industrial, commercial, hospitality and gaming, and transportation end markets, among others. Our Management Services segment provides diversified construction and design-build services to the U.S. military and federal government agencies, as well as surety companies and multi-national corporations in the United States and overseas.

The contracting and management services that we provide consist of general contracting, pre-construction planning and comprehensive management services, including planning and scheduling the manpower, equipment, materials and subcontractors required for the timely completion of a project in accordance with the terms and specifications contained in a construction contract. We also offer self-performed construction services including site work, concrete forming and placement, steel erection, electrical and mechanical, plumbing and HVAC. We provide these services by using traditional general contracting arrangements, such as fixed price, guaranteed maximum price and cost plus fee contracts and, to a lesser extent, construction management or design-build contracting arrangements. In the ordinary course of our business, we enter into arrangements with other contractors, referred to as “joint ventures,” for certain construction projects. Each of the joint venture participants is usually committed to supply a predetermined percentage of capital, as required, and to share in a predetermined percentage of the income or loss of the project. Generally, each joint venture participant is fully liable for the obligations of the joint venture.

We believe our leadership position as the contractor of choice for large, complex civil and non-residential building projects will support our long-term backlog growth. We experienced our third quarter of consecutive growth within our Building segment and we continued to experience increased contributions from our Civil and Specialty Contractor segments consistent with our focus on obtaining higher margin public works projects and enhancing our self-performance capabilities. We expect to continue to leverage our increased self-performance and schedule control capabilities to obtain additional large scale Civil and Building awards. We have capitalized on this leadership position and these synergies with recent significant new awards and pending awards, such as two educational building projects in California valued at $234 million; the Hudson Yards South Tower construction project in New York; a $58 million transit signal modernization project for the New York City Transit Authority; a $40 million federal facility in Mississippi; a $985 million pending award for the joint venture California High-Speed Rail design-build project; and an $840 million pending award for the San Francisco Municipal Transportation Agency (SFMTA) Central Subway project.

We continue our strategic focus on growing our business by pursuing and obtaining large complex public works projects.

The following tables set forth our consolidated condensed statement of operations:

*(In thousands)*

|  | Consolidated Results of Operations Three months ended March 31, 2013 | 2012 | % Change Favorable (Unfavorable) 2013 vs. 2012 |
| --- | ---: | ---: | ---: |
| Revenues | $992,928 | $912,534 | 8.8% |
| Cost of operations | 892,571 | 826,375 | (8.0)% |
| Gross profit | 100,357 | 86,159 | 16.5% |
| General and administrative expenses | 64,278 | 69,196 | 7.1% |
| Income from construction operations | 36,079 | 16,963 | 112.7% |
| Other expense, net | (827) | (2,308) | 64.2% |
| Interest expense | (11,336) | (11,082) | (2.3)% |
| Income before income taxes | 23,916 | 3,573 | 569.4% |
| Provision for income taxes | (9,116) | (4,776) | (90.9)% |
| Net income (loss) | $14,800 | $(1,203) |  |

|  | Consolidated Results of Operations Three months ended March 31, 2013 (As a percentage of Revenues) | 2012 |
| --- | ---: | ---: |
| Revenues | 100.0% | 100.0% |
| Cost of operations | 89.9% | 90.6% |
| Gross profit | 10.1% | 9.4% |
| General and administrative expenses | 6.5% | 7.6% |
| Income from construction operations | 3.6% | 1.8% |
| Other expense, net | (0.1)% | (0.2)% |
| Interest expense | (1.1)% | (1.2)% |
| Income before income taxes | 2.4% | 0.4% |
| Provision for income taxes | (0.9)% | (0.5)% |
| Net income (loss) | 1.5% | (0.1)% |

Revenues were $992.9 million for the three months ended March 31, 2013 compared to $912.5 million for the same quarter of 2012. Income from construction operations was $36.1 million for the three months ended March 31, 2013 compared to $17.0 million for the same quarter of 2012. Net income for the three months ended March 31, 2013 was $14.8 million compared to a net loss of $1.2 million for the same quarter of 2012. Basic and diluted earnings per share were $0.31 for the three months ended March 31, 2013 compared with a basic and diluted loss per share of $0.03 for the same quarter of 2012. Excluding $3.6 million in discrete tax adjustments and a $2.7 million pre-tax loss on the sale of certain auction rate securities, both of which were recognized in the first quarter of 2012, net income and diluted earnings per share for the first quarter of 2012 were $4.1 million and $0.08, respectively. Net income and diluted earnings per share excluding these adjustments are non-GAAP financial measures, which are discussed below and are reconciled to the most directly comparable GAAP measures.

Revenues increased by $80.4 million or 8.8% during the three months ended March 31, 2013 compared to the same quarter last year primarily due to 21.4% and 12.9% growth within the Building and Specialty Contractor Segments, respectively, associated with activity in new hospitality and gaming projects in California, Arizona and Nevada, work performed in New York in connection with damage caused by Hurricane Sandy, and increased activity in a Civil tunnel project in Washington. The increase in net income in the first quarter was primarily due to the increased revenue described above, and a reduction in general and administrative expenses.

At March 31, 2013, working capital was $827.9 million, an increase of $80.3 million from $747.6 million at December 31, 2012.

In the first quarter of 2013, we received significant new contract awards as well as additions to existing contracts and ended the quarter with a contract backlog of $5.5 billion, a decrease of $0.1 billion from $5.6 billion as of December 31, 2012. The decrease was due to reduced backlog in our Civil and Management Services segments associated with continued activity on certain tunnel projects on the West Coast and federal government projects in Afghanistan and Guam, partially offset by increased backlog in our Building and Specialty Contractors segments associated with recent project awards.

### Non-GAAP Measures

Our consolidated financial statements are presented based on accounting principles generally accepted in the United States (“U.S. GAAP”). We sometimes use non-GAAP measures of income from operations, net income, earnings per share and other measures that we believe are appropriate to enhance an overall understanding of our historical financial performance and future prospects. We are providing these non-GAAP measures to disclose additional information to facilitate the comparison of past and present operations, and they are among the indicators management uses as a basis for evaluating the Company’s financial performance as well as for forecasting future periods. For these reasons, management believes these non-GAAP measures can be useful operating performance measures to be considered by investors, prospective investors and others. These non-GAAP measures are not intended to replace the presentation of our financial results in accordance with GAAP, and they may not be comparable to other similarly titled measures of other companies.

The following table is a reconciliation of reported income from construction operations, net income (loss), and diluted earnings (loss) per share under GAAP to income from operations, net income and diluted earnings per share during the three months ended March 31, 2012, excluding discrete items. Included in discrete items is the impact of one-time expenses or benefits: (i) the $2.7 million realized loss on the sale of auction rate securities in the first quarter of 2012 less associated tax benefits and (ii) $3.6 million of discrete tax expense items related to an increase in unrecognized tax benefits and an adjustment, both associated with certain stock-based compensation items identified during the first quarter of 2012.

*(in thousands, except per share data)*

|  | Three months ended March 31, 2013 | 2012 |
| --- | ---: | ---: |
| Reported net income (loss) | $14,800 | $(1,203) |
| Plus: Realized loss on sale of investments | — | 2,699 |
| Less: Tax benefits provided on realized sale of investments | — | (1,057) |
| Plus: Discrete tax adjustments | — | 3,649 |
| Net income, excluding discrete items | $14,800 | $4,088 |
| Reported diluted income (loss) per common share | $0.31 | $(0.03) |
| Plus: Realized loss on sale of investments | — | 0.03 |
| Plus: Discrete tax adjustments | — | 0.08 |
| Diluted earnings per common share, excluding discrete items | $0.31 | $0.08 |

39

### Backlog Analysis

Our backlog of uncompleted construction work at March 31, 2013 was approximately $5.5 billion compared to $5.6 billion at December 31, 2012. During the first quarter of 2013, we converted a number of pending awards into backlog across each of our business segments and had significant adjustments to existing contracts. Significant awards included two educational building projects in California valued at $234 million; the Hudson Yards South Tower construction project in New York; a $58 million transit signal modernization project in New York; and a $40 million federal facility in Mississippi. In addition, we have pending contract awards, including the $985 million joint venture California High-Speed Rail project, the $840 million SFMTA Central Subway project in California, other low bids on civil bridge and transportation projects, and various specialty contracts that we anticipate will enter into backlog in the near future as the contracts for these projects are executed. We are continuing to track several large scale civil and building prospects for both public and private sector customers as we continue to leverage our self-performance and schedule control capabilities.

The following table provides an analysis of our backlog by business segment for the three months ended March 31, 2013.

*(in millions)*

|  | Backlog at December 31, 2012 | New Business Awarded (1) | Revenues Recognized | Backlog at March 31, 2013 |
| --- | ---: | ---: | ---: | ---: |
| Building | $1,964.9 | $490.8 | $(413.6) | $2,042.1 |
| Civil | 1,774.0 | 124.6 | (232.7) | 1,665.9 |
| Specialty Contractors | 1,507.3 | 289.0 | (301.9) | 1,494.4 |
| Management Services | 357.4 | 11.2 | (44.7) | 323.9 |
| Total | $5,603.6 | $915.6 | $(992.9) | $5,526.3 |

(1) New business awarded consists of the original contract price of projects added to our backlog plus or minus subsequent changes to the estimated total contract price of existing contracts.

### Critical Accounting Policies

Our significant accounting policies are described in Note 1 — *Description of Business and Summary of Significant Accounting Policies* of the Notes to Consolidated Financial Statements in Part IV, Item 15. *Exhibits and Financial Statement Schedules*, included in our Annual Report on Form 10-K for the fiscal year ended December 31, 2012. Our critical accounting policies are also identified and discussed in Item 7. *Management’s Discussion and Analysis of Financial Condition and Results of Operations* of our Annual Report on Form 10-K for the fiscal year ended December 31, 2012.

### Recently Issued Accounting Pronouncements

In July 2012, the FASB issued Accounting Standard Update (“ASU”) 2012-02, “*Testing Indefinite-Lived Intangible Assets for Impairment,”* a staff position that gives an entity the option to make a qualitative evaluation about the likelihood of indefinite-lived intangible asset impairment. An entity that adopts this option will be required to perform the quantitative test only if it concludes that the fair value of the indefinite-lived intangible asset is more likely than not less than its carrying value. The effective date is for annual and interim impairment tests performed for fiscal years beginning after September 15, 2012. The adoption of this update did not have a material effect on our consolidated financial statements.

In January 2013, the FASB issued ASU 2013-01, which clarifies which instruments and transactions are subject to the offsetting disclosure requirements established by ASU 2011-11”*Balance Sheet (Topic 210): Disclosures about Offsetting Assets and Liabilities.”.* ASU 2013-01 is effective for the fiscal years beginning on or after January 1, 2013, and interim periods within. Retrospective application is required for any period presented that begins before the entity’s initial application of the new requirements. The adoption of this guidance did not have a material impact on the Company’s financial statements.

In February 2013, the FASB issued ASU 2013-02, “*Reporting of Amounts Reclassified Out of Accumulated Other Comprehensive Income”*, an amendment to FASB ASC Topic 220, “*Comprehensive Income.”* The update requires disclosure of amounts reclassified out of accumulated other comprehensive income by component. In addition, an entity is required to present, either on the face of the statement of operations or in the notes, significant amounts reclassified out of accumulated other comprehensive income by the respective line items of net income but only if the amount reclassified is required to be reclassified to net income in its entirety in the same reporting period. For amounts not reclassified in their entirety to net income, an entity is required to cross-reference to other disclosures that provide additional detail about those amounts. This ASU is effective prospectively for the Company fiscal years, and interim periods within those years beginning after December 15, 2012. The adoption of this guidance did not have any impact on the Company’s financial statements.

In February 2013, the FASB issued ASU 2013-04, which provides guidance for the recognition, measurement, and disclosure of obligations resulting from joint and several liability arrangements for which the total amount of the obligation within the scope of this guidance is fixed at the reporting date. This ASU is an update to FASB ASC Topic 405, “*Liabilities”*. The amendments in this ASU are effective for fiscal years, and interim periods within those years, beginning after December 15, 2013. The Company is currently evaluating the impact of this guidance on its financial statements.

### Use of and changes in estimates

The Company’s construction business involves making significant estimates and assumptions in the normal course of business relating to its contracts and its joint venture contracts. Management focuses on evaluating the performance of contracts individually. These estimates can vary in the normal course of business as projects progress, when estimated productivity assumptions change based on experience to date and uncertainties are resolved. Change orders and claims, as well as changes in related estimates of costs to complete, are considered revisions in estimates. The Company uses the cumulative catch-up method applicable to construction contract accounting to account for revisions in estimates. The impact on operating margin in a reporting period and future periods from a change in estimate will depend on the stage of contract completion. There were no significant changes in contract estimates at completion that impacted gross profit for both the three months ended March 31, 2013 and 2012.

### Results of Operations

### Comparison of the Three Months Ended March 31, 2013 with the Three Months Ended March 31, 2012

Revenues were $992.9 million for the three months ended March 31, 2013 compared to $912.5 million for the same quarter of 2012. Income from construction operations was $36.1 million for the three months ended March 31, 2013 compared to $17.0 million for the same quarter of 2012. Net income for the three months ended March 31, 2013 was $14.8 million compared to a net loss of $1.2 million for the same quarter of 2012. Basic and diluted earnings per share were $0.31 for the three months ended March 31, 2013 compared with a basic and diluted loss per share of $0.03 for the same quarter of 2012. Excluding $3.6 million in discrete tax adjustments and a $2.7 million pre-tax loss on the sale of certain auction rate securities, both of which were recognized in the first quarter of 2012, net income and diluted earnings per share for the year-ago quarter were $4.1 million and $0.08, respectively. Net income and diluted earnings per share excluding these adjustments are non-GAAP financial measures, which are discussed above and are reconciled to the most directly comparable GAAP measures.

#### Revenues

The following table summarizes our revenues by business segment:

*(dollars in millions)*

|  | Revenues for the Three months ended March 31, 2013 | 2012 | $ Change | % Change |
| --- | ---: | ---: | ---: | ---: |
| Building | $413.6 | $340.8 | $72.8 | 21.4% |
| Civil | 232.7 | 249.4 | (16.7) | (6.7)% |
| Specialty Contractors | 301.9 | 267.4 | 34.5 | 12.9% |
| Management Services | 44.7 | 54.9 | (10.2) | (18.6)% |
| Total | $992.9 | $912.5 | $80.4 | 8.8% |

Building segment revenues increased by $72.8 million (or 21.4%), from $340.8 million in the first quarter of 2012 to $413.6 million in the first quarter of 2013, due primarily to activity in new hospitality and gaming projects in California, Arizona and Nevada.

Civil segment revenues decreased by $16.7 million (or 6.7%), from $249.4 million in the first quarter of 2012 to $232.7 million in the first quarter of 2013, due primarily to reduced activity on several mining and civil projects in the Midwest. Those decreases were partially offset by increased activity in a tunnel project in Washington.

Specialty Contractors segment revenues increased by $34.5 million (or 12.9%), from $267.4 million in the first quarter of 2012 to $301.9 million in the first quarter of 2013, due primarily to work performed in connection with damage caused by Hurricane Sandy.

Management Services segment revenues decreased by $10.2 million (or 18.6%), from $54.9 million in the first quarter of 2012 to $44.7 million in the first quarter of 2013, due primarily to reduced activity in a containerized housing project in Iraq, as well as in several surety projects.

#### Income (Loss) from Construction Operations

The following table summarizes our income (loss) from construction operations by business segment:

*(dollars in millions)*

|  | Income (Loss) from Construction Operations and Operating Margins Three months ended March 31, 2013 Amount | Margin | 2012 Amount | Margin | Change in Amount $%% |  | Margin |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Building | $4.2 | 1.0% | $(8.9) | (2.6)% | $13.1 | 147.2% | 3.6% |
| Civil | 21.6 | 9.3% | 16.9 | 6.8% | 4.7 | 27.8% | 2.5% |
| Specialty Contractors | 19.3 | 6.4% | 19.7 | 7.4% | (0.4) | (2.0)% | (1.0)% |
| Management Services | 2.8 | 6.3% | 1.9 | 3.5% | 0.9 | 47.4% | 2.8% |
|  | 47.9 | 4.8% | 29.6 | 3.2% | 18.3 | 61.8% | 1.6% |
| Corporate | (11.8) | (1.2)% | (12.6) | (1.4)% | 0.8 | (6.3)% | 0.2% |
| Income from construction operations | $36.1 | 3.6% | $17.0 | 1.9% | $19.1 | 112.4% | 1.7% |

Building segment income from construction operations increased $13.1 million (or 147.2%), from a loss of $8.9 million in the first quarter of 2012 to income of $4.2 million in the first quarter of 2013, due primarily to the increase in volume discussed above under *Revenues*, contributions from Hurricane Sandy-related projects, and a decrease in general and administrative expenses due primarily to staffing reductions. Building segment operating margin increased from (2.6%) in the first quarter of 2012 to 1.0% in the first quarter of 2013 due primarily to the above-mentioned reasons.

Civil segment income from construction operations increased $4.7 million (or 27.8%), from $16.9 million in the first quarter of 2012 to $21.6 million in the first quarter of 2013, due primarily to the increase in volume on a tunnel project in Washington as discussed above under *Revenues*, and increased higher-margin pipeline work in the Midwest, partly offset by unfavorable cost estimate adjustments associated with the execution of certain mining projects. Civil segment operating margin increased from 6.8% in the first quarter of 2012 to 9.3% in the first quarter of 2013 due primarily to the above-mentioned reasons.

Specialty Contractors segment income from construction operations decreased by $0.4 million (or 2.0%), from $19.7 million in the first quarter of 2012 to $19.3 million in the first quarter of 2013, due primarily to reduced activity on numerous smaller electrical subcontracts, partly offset by Hurricane Sandy-related projects and reduced general and administrative expenses. Specialty Contractors segment operating margin declined from 7.4% in the first quarter of 2012 to 6.4% in the first quarter of 2013 due primarily to reduced activity on several higher-margin electrical subcontracts, as well as several favorable close-out adjustments realized in 2012.

Management Services segment income from construction operations increased by $0.9 million (or 47.4%), from $1.9 million in the first quarter of 2012 to $2.8 million in the first quarter of 2013, due primarily to favorable performance on an aircraft parking apron project in Guam and related favorable adjustments to certain project cost estimates and reduced general and administrative expenses. These increases were partially offset by the reduction in volume discussed above under *Revenues.* Management Services segment operating margin increased from 3.5% in the first quarter of 2012 to 6.3% in the first quarter of 2013 due primarily to the above-mentioned reasons.

Corporate general and administrative expenses decreased by $0.8 million (or 6.3%), from $12.6 million in the first quarter of 2012 to $11.8 million in the first quarter of 2013 due primarily to timing of work performed by certain service providers.

#### Consolidated Other Income, Interest Expense and Provision for Income Taxes

*(dollars in millions)*

| Three months ended | March 31, 2013 | March 31, 2012 | $ Change | % Change |
| --- | ---: | ---: | ---: | ---: |
| Other Income (Expense), net | $(0.8) | $(2.3) | $1.5 | (65.2)% |
| Interest Expense | (11.3) | (11.1) | (0.2) | 1.8% |
| Provision for Income Taxes | (9.1) | (4.8) | (4.3) | 89.6% |

Other expense, net decreased by $1.5 million from $2.3 million in the first quarter of 2012 to $0.8 million in the first quarter of 2013, due primarily to a loss of $2.7 million on the sale of a portion of our auction rate securities in the first quarter of 2012.

Interest expense remained flat at $11.3 million in the first quarter of 2013 compared to $11.1 million in the first quarter of 2012.

We recognized income tax expense of $9.1 million in the first quarter of 2013 compared to income tax expense of $4.8 million in the first quarter of 2012. The increase in income tax expense was due to increased income in the first quarter of 2013. Excluding the unfavorable discrete tax adjustment of $3.6 million in the first quarter of 2012 and the favorable discrete adjustment of $0.4 million in the first quarter of 2013, the effective tax rate increased from 31.6% in the first quarter of 2012 to 39.9 % in the first quarter of 2013.

### Liquidity and Capital Resources

### Cash and Working Capital

At March 31, 2013 and December 31, 2012, cash held by us and available for general corporate purposes was $35.1 million and $70.8 million, respectively. Our proportionate share of cash held by joint ventures and available only for joint venture-related uses, including distributions to joint venture partners, was $97.2 million and $97.3 million at March 31, 2013 and December 31, 2012, respectively, and our restricted cash was $45.2 million and $38.7 million at March 31, 2013 and December 31, 2012, respectively. We do not believe that it is likely we will be called upon to contribute significant additional capital in the event of default by any of our partners.

We require each partner in the joint ventures in which we participate to accept joint and several responsibility for all obligations of the joint venture. Prior to forming a joint venture, we conduct a thorough analysis of the prospective partner to determine its capabilities, specifically relating to construction expertise, track record for delivering a quality product on time, reputation in the industry, as well as financial strength and available liquidity. We utilize a number of resources to verify a potential joint venture partner’s financial condition, including credit rating reports and financial information contained in its audited financial statements. We specifically review a potential partner’s available liquidity and bonding capacity. In the event we are concerned with the financial viability of a potential partner, we will require substantial initial cash contributions upon inception of the joint venture to mitigate the risk that we would be required to cover a disproportionate share of the joint venture’s future cash needs.

The majority of our joint venture contracts are for various government agencies that typically require the joint venture and/or our partners to complete a thorough pre-qualification process. This pre-qualification process typically includes the verification of each partner’s financial condition and capacity to perform the work, as well as the issuance of performance bonds by surety companies who also independently verify each partner’s financial condition.

A summary of cash flows for each of the three months ended March 31, 2013 and 2012 is set forth below:

*(dollars in millions)*

| Cash flows from: | Three Months Ended March 31, 2013 | 2012 |
| --- | ---: | ---: |
| Operating activities | $(84.4) | $(25.0) |
| Investing activities | (18.5) | 9.3 |
| Financing activities | 67.2 | 1.9 |
| Net decrease in cash | (35.7) | (13.8) |
| Cash at beginning of year | 168.0 | 204.2 |
| Cash at end of period | $132.3 | $190.4 |

During the three months ended March 31, 2013, we used $84.4 million in cash to fund operating activities, due primarily to the timing of collections in the Building and Specialty Contractors segments. We used $18.5 million in cash from investing activities, due primarily to the purchase of construction equipment of $12.2 million and an increase of $6.5 million in restricted cash. We received $67.2 million in cash from financing activities, due primarily to our outstanding borrowings under our revolving facility offset by cash used for scheduled debt repayments.

At March 31, 2013, we had working capital of $827.9 million, a ratio of current assets to current liabilities of 1.67 to 1.00, and a ratio of debt to equity of 0.69 to 1.00 compared to working capital of $747.6 million, a ratio of current assets to current liabilities of 1.61 to 1.00 and a ratio of debt to equity of 0.64 to 1.00 at December 31, 2012.

### Long-term Investments

At March 31, 2013, we had investments in auction rate securities (“ARS”) of $46.3 million, which are reflected at fair value. Our investment policy is to manage our assets to achieve our goals of preserving principal, maintaining adequate liquidity at all times, and maximizing returns subject to our investment guidelines. The current overall liquidity concerns in capital markets have affected our ability to liquidate many of our investments in auction rate securities. As such, we classified our ARS as “available-for-sale” Long-term Investments. Based on our ability to access our cash equivalent investments and our available revolving facility, we do not expect that the short-term lack of liquidity of our ARS investments will materially affect our overall liquidity position or our ability to execute our current business plan. For a description of our accounting for our ARS, see Note 5 — *Fair Value Measurements* to Consolidated Condensed Financial Statements.

### Long-term Debt

Debt was $804.4 million at March 31, 2013, an increase of $67.3 million from $737.1 million at December 31, 2012, due primarily to a net increase in borrowings of $84.0 million on our revolving line of credit partially offset by principal payments of $16.7 million on other long-term debt. We utilized the revolving facility for outstanding letters of credit in the amount of $0.2 million. Accordingly, at March 31, 2013, we had $95.8 million available to borrow under our credit agreement. We believe that our financial position and credit arrangements are sufficient to support our current backlog and anticipated new work.

Excluding the outstanding borrowings of $204.0 million on our revolving line of credit, the unsecured senior notes of $298.3 million and our $200 million term loan (which had been paid down to $143.8 million at March 31, 2013 from $152.5 million at December 31, 2012), the remaining balance of $158.3 million of our outstanding debt is generally secured by the underlying assets. Our debt to equity ratio was 0.69x as of March 31, 2013 compared to 0.64x as of December 31, 2012.

On August 2, 2012, we entered into a First Amendment (the “First Amendment”) to its Fifth Amended and Restated Credit Agreement (the “Credit Agreement”) entered into on August 3, 2011 as Borrower, with Bank of America, N.A., as Administrative Agent, Swing Line Lender and L/C Issuer (the “Lender”). The First Amendment modifies the financial covenants under the Credit Agreement to allow for more favorable minimum net worth, minimum fixed charge and maximum leverage ratios for us and also to add several new financial covenants including minimum liquidity and a consolidated senior leverage ratio. The First Amendment also increases the sublimit for letters of credit from $50 million to $150 million. The First Amendment also modifies the applicable interest rates for amounts outstanding under the credit facility as well as the quarterly fees per annum for the unused portion of the credit facility. As of the filing date of this Form 10-Q, we are in compliance and expect to continue to be in compliance with the modified financial covenants under the First Amendment.

There were no other material changes in our contractual obligations during the three months ended March 31, 2013.

### Off-Balance Sheet Arrangements

We do not have any financial partnerships with unconsolidated entities, such as entities often referred to as structured finance, special purpose entities or variable interest entities which are often established for the purpose of facilitating off-balance sheet arrangements or other contractually narrow or limited purposes. Accordingly, we are not exposed to any financing, liquidity, market or credit risk that could arise if we had such relationships.

### Forward-looking Statements

The statements contained in this Management’s Discussion and Analysis of the Consolidated Condensed Financial Statements on Form 10-Q that are not purely historical are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934, including without limitation, statements regarding our management’s expectations, hopes, beliefs, intentions or strategies regarding the future. These forward-looking statements are based on our current expectations and beliefs concerning future developments and their potential effects on us. There can be no assurance that future developments affecting us will be those that we have anticipated. These forward-looking statements involve a number of risks, uncertainties (some of which are beyond our control) or other assumptions that may cause actual results or performance to be materially different from those expressed or implied by such forward-looking statements. These risks and uncertainties include, but are not limited to:

- our ability to win new contracts and convert backlog into revenue;
- our ability to successfully and timely complete construction projects;
- our ability to realize the anticipated economic and business benefits of our acquisitions and our strategy to assemble and operate a Specialty Contractors business segment;
- the potential delay, suspension, termination or reduction in scope of a construction project;
- the continuing validity of the underlying assumptions and estimates of total forecasted project revenues, costs and profits and project schedules;
- the outcomes of pending or future litigation, arbitration or other dispute resolution proceedings;
- the availability of borrowed funds on terms acceptable to us;
- the ability to retain certain members of management;
- the ability to obtain surety bonds to secure our performance under certain construction contracts;
- possible labor disputes or work stoppages within the construction industry;
- changes in federal and state appropriations for infrastructure projects and the impact of changing economic conditions on federal, state and local funding for infrastructure projects;
- possible changes or developments in international or domestic political, social, economic, business, industry, market and regulatory conditions or circumstances;
- actions taken or not taken by third parties including our customers, suppliers, business partners, and competitors and legislative, regulatory, judicial and other governmental authorities and officials; and
- other risks and uncertainties discussed under the heading “Risk Factors” in our Annual Report on

Form 10-K for the year ended December 31, 2012 filed with the Securities and Exchange Commission on February 25, 2013.

We undertake no obligation to publicly update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as may be required under applicable securities laws.

## Market risk

As filed, 239 characters.

There has been no material change in our exposure to market risk from that described in Item 7A of our Annual Report on Form 10-K for the year ended December 31, 2012, filed with the Securities and Exchange Commission on February 25, 2013.

## Controls and procedures

As filed, 1,475 characters.

### Disclosure Controls and Procedures

The Company’s management, including our Chief Executive Officer and Chief Financial Officer, has carried out an evaluation of the effectiveness of the design and operation of our disclosure controls and procedures as required by Rule 13a-15(b) under the Securities Exchange Act of 1934, as amended (“Exchange Act”) as of the period covered by this report. Based upon that evaluation, the Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures (a) were effective to ensure that information we are required to disclose in reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms and (b) include, without limitation, controls and procedures designed to ensure that information required to be disclosed by us in reports filed or submitted under the Exchange Act is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

### Changes in Internal Controls Over Financial Reporting

There were no changes in our internal control over financial reporting during the period covered by this report that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 248 characters.

Information regarding risk factors affecting our business is discussed in our Annual Report on Form 10-K for the year ended December 31, 2012. There have been no material changes from those risk factors during the three months ended March 31, 2013.

Filed May 2, 2013.
Source: SEC EDGAR, the filing index for accession 0001104659-13-036099. Last ingested by Listed: Nov 15, 2026, 00:46 ET. No prices; not investment advice.