# Southern Copper Corp/: Form 10-K for the period ended Dec 31, 2013

- Company: [Southern Copper Corp/](/companies/scco.md) (CIK 1001838)
- Form: 10-K
- Filed: 2014-02-27
- Accepted by EDGAR: Feb 27, 2014, 14:52 ET
- Period: 2013-12-31
- Accession: 0001104659-14-014124
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1001838/000110465914014124/a13-26010_110k.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1001838/000110465914014124/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2013-12-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 12 months, 2013-01-01 to 2013-12-31 | $5.95bn | us-gaap:Revenues |
| Cost of revenue | 12 months, 2013-01-01 to 2013-12-31 | $2.87bn | us-gaap:CostOfRevenue |
| Gross profit | 3 months, 2013-10-01 to 2013-12-31 | $658.5m | us-gaap:GrossProfit |
| Gross profit | 12 months, 2013-01-01 to 2013-12-31 | $2.69bn | us-gaap:GrossProfit |
| Selling, general and administrative | 12 months, 2013-01-01 to 2013-12-31 | $102.6m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months, 2013-10-01 to 2013-12-31 | $615.9m | us-gaap:OperatingIncomeLoss |
| Operating income | 12 months, 2013-01-01 to 2013-12-31 | $2.53bn | us-gaap:OperatingIncomeLoss |
| Income tax | 12 months, 2013-01-01 to 2013-12-31 | $769.3m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2013-10-01 to 2013-12-31 | $407.5m | us-gaap:ProfitLoss |
| Net income | 12 months, 2013-01-01 to 2013-12-31 | $1.62bn | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2013-10-01 to 2013-12-31 | $0.48 | us-gaap:EarningsPerShareBasicAndDiluted |
| Diluted EPS | 12 months, 2013-01-01 to 2013-12-31 | $1.92 | us-gaap:EarningsPerShareBasicAndDiluted |
| Operating cash flow | 12 months, 2013-01-01 to 2013-12-31 | $1.86bn | us-gaap:NetCashProvidedByUsedInOperatingActivitiesContinuingOperations |
| Capital expenditure | 12 months, 2013-01-01 to 2013-12-31 | $1.70bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 12 months, 2013-01-01 to 2013-12-31 | $573.8m | us-gaap:PaymentsOfDividendsCommonStock |
| Share repurchases | 12 months, 2013-01-01 to 2013-12-31 | $281.4m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2013-12-31 | $1.67bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2013-12-31 | $3.42bn | us-gaap:AssetsCurrent |
| Total assets | at 2013-12-31 | $11.21bn | us-gaap:Assets |
| Current liabilities | at 2013-12-31 | $783.6m | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2013-12-31 | $4.20bn | us-gaap:LongTermDebtNoncurrent |
| Shareholders' equity | at 2013-12-31 | $5.53bn | us-gaap:StockholdersEquity |

## Business

As filed, 43,976 characters.

THE COMPANY

Southern Copper Corporation (“SCC”, “Southern Copper” or the “Company”) is one of the largest integrated copper producers in the world. We produce copper, molybdenum, zinc and silver. All of our mining, smelting and refining facilities are located in Peru and Mexico and we conduct exploration activities in those countries and in Argentina, Chile and Ecuador. See Item 2 “Properties - Review of Operations” for maps of our principal mines, smelting facilities and refineries. Our operations make us one of the largest mining companies in Peru and Mexico. We believe we have the largest copper reserves in the world. We were incorporated in Delaware in 1952 and have conducted copper mining operations since 1960. Since 1996, our common stock has been listed on both the New York and Lima Stock Exchanges.

Our Peruvian copper operations involve mining, milling and flotation of copper ore to produce copper concentrates and molybdenum concentrates; the smelting of copper concentrates to produce anode copper; and the refining of anode copper to produce copper cathodes. As part of this production process, we also produce significant amounts of molybdenum concentrate and refined silver. Additionally, we produce refined copper using SX-EW technology. We operate the Toquepala and Cuajone mines high in the Andes Mountains, approximately 860 kilometers southeast of the city of Lima, Peru. We also operate a smelter and refinery west of the Toquepala and Cuajone mines in the coastal city of Ilo, Peru.

Our Mexican operations are conducted through our subsidiary, Minera Mexico S.A. de C.V. (“Minera Mexico”), which we acquired in 2005. Minera Mexico engages primarily in the mining and processing of copper, molybdenum, zinc, silver, gold and lead. Minera Mexico operates through subsidiaries that are grouped into three separate units. Mexicana de Cobre S.A. de C.V. (together with its subsidiaries, the “La Caridad unit”) operates La Caridad, an open-pit copper mine, a copper ore concentrator, a SX-EW plant, a smelter, refinery and a rod plant. Since July 2011, Operadora de Minas e Instalaciones Mineras S.A de C.V. ( the “Buenavista unit”) operates Buenavista, formerly named Cananea, an open-pit copper mine, which is located at the site of one of the world’s largest copper ore deposits, a copper concentrator and two SX-EW plants. The Buenavista mine was operated from December 11, 2010 to July 2011 by Buenavista del Cobre S.A. de C.V. Industrial Minera Mexico, S.A. de C.V. (together with its subsidiaries, the “IMMSA unit”) operates five underground mines that produce zinc, lead, copper, silver and gold, a coal mine and a zinc refinery.

We utilize modern, state of the art mining and processing methods, including global positioning systems and computerized mining operations. Our operations have a high level of vertical integration that allows us to manage the entire production process, from the mining of the ore to the production of refined copper and other products and most related transport and logistics functions, using our own facilities, employees and equipment.

The sales prices for our products are largely determined by market forces outside of our control. Our management, therefore, focuses on cost control and production enhancement to remain profitable. We endeavor to achieve these goals through capital spending programs, exploration efforts and cost reduction programs. Our focus is to remain profitable during periods of low copper prices and on maximizing results in periods of high copper prices. For additional information on the sale prices of the metals we produce, please see “Metal Prices” in this Item 1.

Currency Information:

Unless stated otherwise, all our financial information is presented in U.S. dollars and any reference herein to “U.S. dollars”, “dollars”, or “$” are to U.S. dollars; references to “S/.”, “nuevo sol” or “nuevos soles”, are to Peruvian nuevos soles; and references to “peso”, “pesos”, or “Ps.”, are to Mexican pesos.

Unit Information:

Unless otherwise noted, all tonnages are in metric tons. To convert to short tons, multiply by 1.102. All ounces are troy ounces. All distances are in kilometers. To convert to miles, multiply by 0.621. To convert hectares to acres, multiply by 2.47.

ORGANIZATIONAL STRUCTURE

The following chart describes our organizational structure, starting with our controlling stockholders, as of December 31, 2013. For clarity of presentation, the chart identifies only our main subsidiaries and eliminates intermediate holding companies.

We are a majority-owned, indirect subsidiary of Grupo Mexico S.A.B. de C.V. (“Grupo Mexico”). Through its wholly-owned subsidiaries, Grupo Mexico as of December 31, 2013 owned 82.3% of our capital stock. Grupo Mexico’s principal business is to act as a holding company for shares of other corporations engaged in the mining, processing, purchase and sale of minerals and other products and railway and other related services.

We conduct our operations in Peru through a registered branch (the “SPCC Peru Branch”, “Branch” or “Peruvian Branch”). The SPCC Peru Branch comprises substantially all of our assets and liabilities associated with our copper operations in Peru. The SPCC Peru Branch is not a corporation separate from us and, therefore, obligations of SPCC Peru Branch are direct obligations of SCC and vice-versa. It is, however, an establishment, registered pursuant to Peruvian law, through which we hold assets, incur liabilities and conduct operations in Peru. Although it has neither its own capital nor liability separate from us, it is deemed to have equity capital for purposes of determining the economic interests of holders of our investment shares, (See Note 12 “Non-Controlling Interest” of our consolidated financial statements).

On April 1, 2005, we acquired Minera Mexico, the largest mining company in Mexico on a stand-alone basis, from Americas Mining Corporation (“AMC”), a subsidiary of Grupo Mexico, our controlling stockholder. Minera Mexico is a holding company and all of its operations are conducted through subsidiaries that are grouped into three units: (i) the La Caridad unit (ii) the Buenavista unit and (iii) the IMMSA unit. We own 99.95% of Minera Mexico.

In 2008, our Board of Directors authorized a $500 million share repurchase program. On July 28, 2011, our Board of Directors authorized an increase of the share repurchase program to $1 billion and on October 17, 2013, our Board of Directors authorized an additional increase to $2 billion. Pursuant to this program, through December 31, 2013 we have purchased 57.2 million shares of our common stock at a cost of $1,159.5 million. These shares are available for general corporate purposes. We may purchase additional shares from time to time, based on market conditions and other factors. This repurchase program has no expiration date and may be modified or discontinued at any time.

REPUBLIC OF PERU AND MEXICO

Our revenues are derived primarily from our operations in Peru and Mexico. Risks related to our operations in both countries include those associated with economic and political conditions, the effects of currency fluctuations and inflation, the effects of government regulations and the geographic concentration of our operations.

AVAILABLE INFORMATION

We file annual, quarterly and current reports, proxy statements and other information with the U.S. Securities and Exchange Commission (“SEC”). You may read and copy any document we file at the SEC’s Public Reference Room at 100 F Street NE, Washington, D.C. 20549. Please call the SEC at 1-800-SEC-0330 for information on the Public Reference Room. The SEC maintains a website that contains annual, quarterly and current reports, proxy statements and other information that issuers (including Southern Copper Corporation) file electronically with the SEC. The SEC’s website is www.sec.gov.

Our Internet address is www.southerncoppercorp.com. Commencing with the Form 8-K dated March 14, 2003, we have made available free of charge on this internet address our annual, quarterly and current reports, as soon as reasonably practical after we electronically file such material with, or furnish it to, the SEC. Our website also includes the Company’s Corporate Governance guidelines and the charters of our principal Board Committees. However, the information found on our website is not part of this or any other report.

CAUTIONARY STATEMENT

Forward-looking statements in this report and in other Company statements include statements regarding expected commencement dates of mining or metal production operations, projected quantities of future metal production, anticipated production rates, operating efficiencies, costs and expenditures, including taxes, as well as projected demand or supply for the Company’s products. Actual results could differ materially depending upon certain factors, including the risks and uncertainties relating to general U.S. and international economic and political conditions, the cyclical and volatile prices of copper, other commodities and supplies, including fuel and electricity, the availability of materials, insurance coverage, equipment, required permits or approvals and financing, the occurrence of unusual weather or operating conditions, lower than expected ore grades, water and geological problems, the failure of equipment or processes to operate in accordance with specifications, failure to obtain financial assurance to meet closure and remediation obligations, labor relations, litigation and environmental risks, as well as political and economic risk associated with foreign operations. Results of operations are directly affected by metal prices on commodity exchanges, which can be volatile.

Additional business information follows:

COPPER BUSINESS

Copper is the world’s third most widely used metal, after iron and aluminum, and an important component in the world’s infrastructure. Copper has unique chemical and physical properties, including high ductility, malleability, and thermal and electrical conductivity, and resistance to corrosion that has made it a superior material for use in electrical and electronic products, including power transmission and generation, which accounts for about three quarters of its global copper use, telecommunications, building construction, transportation and industrial machinery. Copper is also an important metal in non-electrical applications such as plumbing and roofing and, when alloyed with zinc to form brass, in many industrial and consumer applications.

Copper is an internationally traded commodity with prices principally determined by the major metal exchanges, the Commodities Exchange, or “COMEX”, in New York and the London Metal Exchange or “LME.” Copper is usually found in nature in association with sulfur. Pure copper metal is generally produced from a multistage process, beginning with the mining and concentrating of low-grade ores containing copper sulfide minerals, and followed by smelting and electrolytic refining to produce a pure copper cathode. An increasing share of copper is produced from acid leaching of oxidized ores. Copper is one of the oldest metals ever used and has been one of the most important materials in the development of civilization.

BUSINESS REPORTING SEGMENTS:

Our management views Southern Copper as having three reportable segments and manages it on the basis of these segments.

The three segments identified are groups of individual mines, each of which constitutes an operating segment with similar economic characteristics, type of products, processes and support facilities, regulatory environments, employee bargaining contracts and currency risks. In addition, each mine within the individual group earns revenues from similar type of customers for their products and services and each group incurs expenses independently, including commercial transactions between groups.

Inter-segment sales are based on arm’s-length prices at the time of sale. These may not be reflective of actual prices realized by the Company due to various factors, including additional processing, timing of sales to outside customers and transportation cost. Added to the segment information is information regarding the Company’s sales. The segments identified by the Company are:

1\. Peruvian operations, which include the Toquepala and Cuajone mine complexes and the smelting and refining plants, industrial railroad and port facilities that service both mines. Sales of its products are recorded as revenue of our Peruvian mines. The Peruvian operations produce copper, with production of by-products of molybdenum, silver and other material.

2\. Mexican open-pit operations, which include the La Caridad and Buenavista mine complexes and the smelting and refining plants and support facilities that service both mines. Sales of its products are recorded as revenue of our Mexican mines. The Mexican open-pit operations produce copper, with production of by-products of molybdenum, silver and other material.

3\. Mexican underground mining operations, which include five underground mines that produce zinc, copper, silver and gold, a coal mine that produces coal and coke, and a zinc refinery. This group is identified as the IMMSA unit and sales of its products are recorded as revenue of the IMMSA unit.

Financial information is regularly prepared for each of the three segments and the results are reported to the Senior Management Officers on a segment basis. The Senior Management Officers focus on operating income and on total assets as measures of performance to evaluate different segments and to make decisions to allocate resources to the reported segments. These are common measures in the mining industry.

Segment information is included in Item 2 “Properties,” under the captions — “Metal Production by Segments” and “Ore Reserves.” More information on business segment and segment financial information is included in Note 19 “Segment and Related Information” of our consolidated financial statements.

CAPITAL INVESTMENT PROGRAM

For a description of our capital investment program, see Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” — “Capital Investment Program.”

EXPLORATION ACTIVITIES

We are engaged in ongoing extensive exploration to locate additional ore bodies in Peru, Mexico, Argentina, Ecuador and Chile. We also conduct exploration in the areas of our current mining operations. We invested $51.0 million in exploration programs in 2013, $47.9 million in 2012 and $37.5 million in 2011 and we expect to spend approximately $67.8 million in exploration programs in 2014.

Currently, we have direct control of 93,972 and 160,454 hectares of exploration concessions in Peru and in Mexico, respectively. We also currently hold 100,383 hectares, 35,958 hectares and 2,544 hectares of exploration concessions in Argentina, Chile and Ecuador, respectively.

#### Peru

*Los Chancas.* This property, located in the department of Apurimac in southern Peru, is a copper and molybdenum porphyry deposit. At the end of 2013, we were in the final stages of completing a feasibility study for this property and expect to initiate an environmental impact assessment study in 2014. Current estimates indicate the presence of 545 million tons of mineralized material with a copper content of 0.59%, molybdenum content of 0.04% and 0.039 grams of gold per ton and 181 million tons of mineralized leachable material with a total copper content of 0.357%.

*Other Peruvian Prospects.* In 2013, after the evaluation of the 2012 drilling program results at El Penon, we decided not to pursue this project. Also, in 2013 we concluded an exploration program of 7,246 meters of diamond drilling around our current operating areas.

For 2014, we plan to continue, and further develop a diamond drilling program of 25,000 meters at several other Peruvian mineralized zones, including the Lagarto project, which is located in the north of the Lima region where we are exploring for a copper porphyry system. We also plan to continue with the regional exploration program at several different metallogenic zones of Peru.

#### Mexico

In addition to exploratory drilling programs at existing mines, we are currently conducting exploration to locate mineral deposits at various other sites in Mexico. The following are some of the more significant exploration projects:

*Buenavista-Zinc.* The Buenavista-Zinc site is located in the state of Sonora, Mexico and forms part of the Buenavista ore body. Drilling and metallurgical studies have shown that the zinc-copper deposit contains approximately 36 million tons of mineralized material containing 29 grams of silver per ton, 0.69% copper and 3.3% zinc. A “scoping level” study indicates that Buenavista-Zinc may be an economic deposit. In 2011, 11,956 meters of diamond drilling were executed to confirm grade and acquire geotechnical information. In 2012, the Buenavista-Zinc mine plan was integrated with the overall mine plan of the Buenavista pit. The metallurgical testing was completed early in 2013 indicating some recovery problems with oxidized zinc. During 2013, we drilled 15,128 additional meters to locate the oxidized zinc for new modelling and metallurgical testing. We expect to receive the results of the new model early in 2014 and to proceed with metallurgical testing.

*The Chalchihuites.* The Chalchihuites site is located in the state of Zacatecas. It is a replacement deposit with mixed oxides and sulfides of lead, copper, zinc and silver. In the late 1990s, a drilling program defined 16 million tons of mineralized material containing 95 grams of silver per ton and lead content of 0.36%, copper content of 0.69% and zinc content of 3.08%. Preliminary metallurgical testing indicates that a leaching precipitating-flotation recovery process can be applied to this ore. In 2009, we started a prefeasibility study, which we expect to complete early in 2014. In 2010 and 2011, we added several claims and performed a 9,386 meter drilling program that indicated at least seven million tons of mineralized material containing 97.9 grams of silver per ton, 0.41% lead, 0.52% copper and 2.53% zinc. In 2013, we continued with the process to obtain all permits and the land acquisition required for the project. In 2014, we plan to perform additional drilling to confirm the metallurgical results of the prefeasibility study and to drill three water wells to supply the water requirements of the project.

*Sierra de Lobos.* This project is located southwest of the city of Leon, Guanajuato. Drilling in 2008 confirmed the presence of copper and zinc mineralization, but an economic deposit has not yet been identified. The project was on hold between 2010 and 2011 due to the changes in our investment program priorities. In 2012, we obtained all required permits and started drilling activities. In 2013, we drilled 3,945 meters. Although we identified some mineralized ore bodies, they were not continuous. In 2014 we will analyze the results and decide the future of the project.

#### Chile

*Catanave.* Located in northern Chile (Arica), Catanave belongs to a mineralized epithermal system of gold and silver. In 2010, the environmental impact study was approved. Between 2011 and 2013 diamond drilling programs were completed. Currently we are evaluating the results of the drilling programs to decide the future of the project.

*Santa Marta and San Benito.* In 2013, after completing our diamond drilling program at these prospects, we decided not to pursue further work on the properties.

*El Salado*. A copper-gold prospect located in the Atacama region, northern Chile is being explored for copper and molybdenum porphyry. In 2013, we completed a conceptual engineering study of the project, which identified mineralization restricted to veins and irregular bodies. In 2013, we started a diamond drilling program of 22,000 meters focused on classifying the existing mineral. A further diamond drilling program of 15,000 meters is planned for 2014 defining the mineralized structures of the Diego de Almeida zone.

*Resguardo de la Costa.* A copper-gold prospect located in northern Chile (Atacama area). This prospect continues on hold, pending further evaluation.

*Other Chilean Prospects.* For 2014, we plan to continue with a regional exploration program focused on locating systems, mainly of porphyritic of copper and molybdenum. We plan to explore mainly in the Atacama metallogenetic strip, and the El Salado region where the Amor prospect, which has evidence of copper oxides and sulfurs and gold, is located.

#### Ecuador

In 2011, we started exploration activities in Ecuador.

*Chaucha:* the Ruta del Cobre (“Copper Road”) project is located south of Guayaquil. The mineralization is characteristic of a copper-molybdenum porphyry system. In 2013, we obtained all the permits required for the evaluation of the deposit. In 2014, we plan to conduct a diamond drilling program of 20,000 meters.

#### Argentina

In 2011, we started exploration activities in Argentina. During 2012, we carried out exploration mainly at the Cochicos project, located in the Province of Neuquen, where we expect to locate mineralization for an epithermal gold and silver system. During 2013, we performed geological exploration in the Salta, San Juan and Neuquen provinces where we expect to locate copper porphyry with precious metals epithermal systems. For 2014 we plan to start a diamond drilling exploration program of 10,000 meters at the Cerro Sementa project, located in the Salta Province, where we expect to locate porphyry copper and molybdenum mineralization. We also plan to continue with the regional exploration at Piuqenes and La Voluntad located in the San Juan and Neuquen provinces, respectively, where we expect to locate porphyry copper and molybdenum mineralization.

PRINCIPAL PRODUCTS AND MARKETS

Copper is primarily used in the building and construction industries, electrical and electronic products and, to a lesser extent, industrial machinery and equipment, consumer products and in the automotive and transportation industries. Molybdenum is used to toughen alloy steels and soften tungsten alloy and is also used in fertilizers, dyes, enamels and reagents. Silver is used for photographic, electrical and electronic products and, to a lesser extent, brazing alloys and solder, jewelry, coinage, silverware and catalysts. Zinc is primarily used as a coating on iron and steel to protect against corrosion. It is also used to make die cast parts, in the manufacturing of batteries and in the form of sheets for architectural purposes.

Our marketing strategy and annual sales planning emphasize developing and maintaining long-term customer relationships, and thus acquiring annual or other long-term contracts for the sale of our products is a high priority. Approximately 80% of our metal production for years 2013, 2012 and 2011, was sold under annual or longer-term contracts. Sales prices are determined based on prevailing commodity prices for the quotation period according to the terms of the contract.

We focus on the ultimate end-user customers as opposed to selling on the spot market or to trading companies. In addition, we devote significant marketing effort to diversifying our sales both by region and by customer base. We also strive to provide superior customer service, including timely deliveries of our products. Our ability to consistently fulfill customer demand is supported by our substantial production capacity.

For additional information on sales please see, “Revenue recognition” in Note 2 “Summary of Significant Accounting Policies” and Note 19 “Segment and Related Information” of our consolidated financial statements.

METALS PRICES

Prices for our products are principally a function of supply and demand and, except for molybdenum, are established on COMEX and LME, the two most important metal exchanges in the world. Prices for our molybdenum products are established by reference to the publication Platt’s Metals Week. Our contract prices also reflect any negotiated premiums and the costs of freight and other factors. From time to time, we have entered into hedging transactions to provide partial protection against future decreases in the market price of metals and we may do so under certain market conditions. We entered into copper derivative contracts for the first quarter of 2012 and the years 2011 and 2010. For a further discussion of derivative instruments, see Item 7A “Quantitative and Qualitative Disclosures about Market Risk.” For a further discussion of our products market prices, please see Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” — “Metal Prices.”

The table below shows the high, low and average COMEX and LME per pound copper prices during the last 15 years:

| Year | Copper (COMEX) High | Low | Average | Copper (LME) High | Low | Average |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| 1999 | 0.85 | 0.61 | 0.72 | 0.84 | 0.61 | 0.71 |
| 2000 | 0.93 | 0.74 | 0.84 | 0.91 | 0.73 | 0.82 |
| 2001 | 0.87 | 0.60 | 0.73 | 0.83 | 0.60 | 0.72 |
| 2002 | 0.78 | 0.65 | 0.72 | 0.77 | 0.64 | 0.71 |
| 2003 | 1.04 | 0.71 | 0.81 | 1.05 | 0.70 | 0.81 |
| 2004 | 1.54 | 1.06 | 1.29 | 1.49 | 1.06 | 1.30 |
| 2005 | 2.28 | 1.40 | 1.68 | 2.11 | 1.39 | 1.67 |
| 2006 | 4.08 | 2.13 | 3.10 | 3.99 | 2.06 | 3.05 |
| 2007 | 3.75 | 2.40 | 3.23 | 3.77 | 2.37 | 3.23 |
| 2008 | 4.08 | 1.25 | 3.13 | 4.08 | 1.26 | 3.16 |
| 2009 | 3.33 | 1.38 | 2.35 | 3.33 | 1.38 | 2.34 |
| 2010 | 4.44 | 2.76 | 3.43 | 4.42 | 2.76 | 3.42 |
| 2011 | 4.62 | 3.05 | 4.01 | 4.60 | 3.08 | 4.00 |
| 2012 | 3.97 | 3.28 | 3.61 | 3.93 | 3.29 | 3.61 |
| 2013-1st Q | 3.78 | 3.40 | 3.60 | 3.74 | 3.42 | 3.60 |
| 2013-2nd Q | 3.44 | 3.03 | 3.25 | 3.42 | 3.01 | 3.24 |
| 2013-3rd Q | 3.36 | 3.04 | 3.23 | 3.33 | 3.05 | 3.21 |
| 2013-4th Q | 3.47 | 3.15 | 3.28 | 3.35 | 3.15 | 3.24 |
| 2013 | 3.78 | 3.03 | 3.34 | 3.74 | 3.01 | 3.32 |

The per pound COMEX copper price during the last 5, 10 and 15 year periods averaged $3.35, $2.92 and $2.20 respectively. The per pound LME copper price during the last 5, 10 and 15 year periods averaged $3.34, $2.91 and $2.19, respectively.

The table below shows the high, low and average per-pound, except silver, which is per ounce, market prices for our three principal by-products during the last 15 years:

| Year | Silver (COMEX) High | Low | Average | Molybdenum (Dealer Oxide Platt’s Metals Week) High | Low | Average | Zinc(LME) High | Low | Average |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| 1999 | 5.76 | 4.87 | 5.22 | 2.80 | 2.52 | 2.66 | 0.56 | 0.41 | 0.49 |
| 2000 | 5.55 | 4.56 | 4.97 | 2.92 | 2.19 | 2.56 | 0.58 | 0.46 | 0.51 |
| 2001 | 4.81 | 4.03 | 4.36 | 2.58 | 2.19 | 2.35 | 0.48 | 0.33 | 0.40 |
| 2002 | 5.11 | 4.22 | 4.60 | 7.90 | 2.43 | 3.76 | 0.38 | 0.33 | 0.35 |
| 2003 | 5.98 | 4.35 | 4.89 | 7.60 | 3.28 | 5.29 | 0.46 | 0.34 | 0.38 |
| 2004 | 8.21 | 5.51 | 6.68 | 32.38 | 7.35 | 16.20 | 0.58 | 0.43 | 0.48 |
| 2005 | 9.00 | 6.43 | 7.32 | 39.25 | 25.00 | 31.99 | 0.87 | 0.53 | 0.63 |
| 2006 | 14.85 | 8.82 | 11.54 | 28.20 | 21.00 | 24.75 | 2.10 | 0.87 | 1.49 |
| 2007 | 15.50 | 11.47 | 13.39 | 33.75 | 24.50 | 30.19 | 1.93 | 1.00 | 1.47 |
| 2008 | 20.69 | 8.80 | 14.97 | 33.88 | 8.75 | 28.42 | 1.28 | 0.47 | 0.85 |
| 2009 | 19.30 | 10.42 | 14.67 | 18.00 | 7.83 | 10.91 | 1.17 | 0.48 | 0.75 |
| 2010 | 30.91 | 14.82 | 20.18 | 18.60 | 11.75 | 15.60 | 1.14 | 0.72 | 0.98 |
| 2011 | 48.58 | 26.81 | 35.18 | 17.88 | 12.70 | 15.33 | 1.15 | 0.79 | 0.99 |
| 2012 | 37.14 | 26.25 | 31.19 | 14.80 | 10.90 | 12.62 | 0.99 | 0.80 | 0.88 |
| 2013-1st Q | 32.41 | 28.29 | 30.03 | 11.95 | 10.70 | 11.28 | 0.99 | 0.84 | 0.92 |
| 2013-2nd Q | 27.91 | 18.53 | 23.10 | 11.20 | 10.28 | 10.80 | 0.87 | 0.81 | 0.83 |
| 2013-3rd Q | 24.65 | 18.73 | 21.39 | 10.18 | 9.12 | 9.36 | 0.89 | 0.81 | 0.84 |
| 2013-4th Q | 22.95 | 19.01 | 20.77 | 9.88 | 9.33 | 9.60 | 0.96 | 0.83 | 0.87 |
| 2013 | 32.41 | 18.53 | 23.82 | 11.95 | 9.12 | 10.26 | 0.99 | 0.81 | 0.87 |

The per pound LME zinc price during the last 5, 10 and 15 year periods averaged $0.89, $0.94 and $0.77, respectively. The per ounce COMEX silver price during the last 5, 10 and 15 year periods averaged $25.01, $17.89 and $13.53, respectively. The per pound Platt’s Metals Week Dealer Oxide molybdenum price during the last 5, 10 and 15 year periods averaged $12.94, $19.63 and $14.19, respectively.

COMPETITIVE CONDITIONS

Competition in the copper market is primarily on a price and service basis, with price being the most important consideration when supplies of copper are ample. Our products compete with other materials, including aluminum and plastics. For additional information, see “Item 1A Risk Factors — The copper mining industry is highly competitive.”

LABOR FORCE

As of December 31, 2013, we had 12,665 employees, approximately 70.6% of whom are unionized and represented by ten different labor unions. In recent years we have experienced a positive labor environment in our operations in Mexico and Peru, which is allowing us to increase productivity as well as helping us to achieve the goals of our capital expansion program.

Peru

Approximately 65.3% of our 4,430 Peruvian employees were unionized at December 31, 2013, represented by seven separate unions. Three of these unions, one at each major production area, represent the majority of our workers. Also, there are four smaller unions, representing the balance of workers. In the first quarter of 2013, we signed three-year collective bargaining agreements with all the unions. The agreements included, among other things, annual salary increases of 6.5%, 5% and 5% for each of the three years.

Employees of the Toquepala and Cuajone units reside in townsites, where we have built 3,700 houses and apartments. We also have 90 houses at Ilo for staff personnel. Housing, together with maintenance and utility services, is provided at minimal cost to most of our employees. Our townsite and housing complexes include schools, medical facilities, churches, social clubs and recreational facilities. We also provide shopping, banking and other services at the townsites.

Mexico

Approximately 73.8% of our 8,182 Mexican employees were unionized at December 31, 2013, represented by three separate unions. Under Mexican law, the terms of employment for unionized workers is set forth in collective bargaining agreements. Mexican companies negotiate the salary provisions of collective bargaining agreements with the labor unions annually and negotiate other benefits every two years. We conduct negotiations separately at each mining complex and each processing plant.

In recent years, the Mexican operations have experienced a positive improvement of their labor environment, as our workers, opted to change their affiliation from the *Sindicato Nacional de Trabajadores Mineros, Metalurgicos y Similares de la Republica Mexicana* (National Union of Mine and Metal Workers and Similar Activities of the Mexican Republic or the “National Mining Union”) the union formerly led by Napoleon Gomez Urrutia, to other less politicized unions. We believe that this change creates a more positive labor environment and will benefit both the Company and workers and allow us to increase our productivity and develop our capital expansion programs.

Our Taxco and San Martin mines in Mexico have been on strike since July 2007. For a discussion of labor matters reference is made to the information contained under the caption “Labor matters” in Note 13 “Commitments and Contingencies” of the consolidated financial statements

Employees of La Caridad and Buenavista units reside in townsites at Nacozari and Cananea, where we have built approximately 2,000 houses and apartments and 275 houses and apartments, respectively. Most of the employees of the IMMSA unit reside on the grounds of the mining or processing complexes in which they work and where we have built approximately 900 houses and apartments. Housing, together with maintenance and utility services, is provided at minimal cost to most of our employees. Our townsites and housing complexes include educational and, in some units, medical facilities, churches, social clubs, shopping centers, banking and other services. Through 2007, the Buenavista unit (at that time Cananea) provided health care services free of charge to employees and retired unionized employees and their families through its own hospital at the Buenavista unit. In 2011, the Company signed an agreement with the Secretary of Health of the State of Sonora to continue providing these services to its retired workers and their families. The new workers of Buenavista del Cobre will receive health services from the Mexican Institute of Social Security as is the case for all Mexican workers.

FUEL, ELECTRICITY AND WATER SUPPLIES

The principal raw materials used in our operations are fuels, electricity and water. We use natural gas to power boilers and generators and for metallurgical processes at our Mexican operations and diesel fuel for mining equipment. We believe that supplies of fuel, electricity and water are readily available. Although the prices of these raw materials may fluctuate beyond our control, we focus our efforts to reduce these costs through cost and energy saving measures.

Energy is the principal cost in mining, therefore the concern for its conservation and efficient usage is very important. We have energy management committees at most of our mines. The committees meet periodically to discuss consumption and to develop measures directed at saving energy. Also, alternative sources are being analyzed at the corporate level, both from traditional and renewable energy sources. This has helped us to develop a culture of energy conservation directed at the sustainability of our operations.

Peru

Fuel: In Peru, we obtain fuel primarily from a local producer. The Company believes that adequate supplies of fuel are available in Peru.

Electricity: In Peru, electric power for our operating facilities is generated by two thermal electric plants owned and operated by Enersur S.A., an independent power company (“Enersur”), a diesel and waste heat boilers plant located adjacent to the Ilo smelter and a coal plant located south of Ilo. Power generation capacity for Peruvian operations is currently 344 megawatts. Enersur constructed and placed in service three new power units by the end of June 2013, with a total capacity of 564 megawatt, which is providing additional power reserves in the south of Peru. Enersur is planning to build another 500 megawatt plant in the same area, which is expected to be completed by March 2017.

In addition, we have nine megawatts of power generation capacity from two small hydro-generating installations at Cuajone. Power is distributed over a 224-kilometer closed loop transmission circuit, which is interconnected with the Peruvian network.

In 1997, we sold our Ilo power plant to Enersur. In connection with the sale, a power purchase agreement was also completed under which we agreed to purchase all of our power needs for our Peruvian operations from Enersur for twenty years, commencing in 1997. In 2003, the agreement was amended releasing Enersur from its obligation to construct additional capacity to meet our increased electricity requirements and changing the power tariff as called for in the original agreement.

In 2009, we signed a Memorandum of Understanding (“MOU”) with Enersur regarding its power supply agreement. The MOU contains new economic terms that we believe better reflect current economic conditions in the power industry and in Peru. Additionally, the MOU includes an option for providing power for the Tia Maria project.

Water: We have water rights or licenses for up to 1,950 liters per second from well fields at the Huaitire, Vizcachas and Titijones aquifers and also surface water from the Suches lake and two small water courses, Quebrada Honda and Quebrada Tacalaya. We believe these water resources are sufficient to supply the needs of our operating units at Toquepala and Cuajone. At Ilo, we have desalinization plants that produce water for industrial and domestic use that we believe are sufficient for our current and projected needs.

Mexico

Fuel: In Mexico, fuel is purchased directly from Petroleos Mexicanos, (“PEMEX”), the state oil monopoly.

The La Caridad unit imports natural gas from the United States through its pipeline (between Douglas, Arizona and Nacozari, Sonora). This permits us to import natural gas from the United States at market prices and thereby reduce operating costs. Several contracts with PEMEX and the United States provide us with the option of using a monthly fixed price or daily fixed prices for our natural gas purchases.

Natural gas is used for metallurgical processes, to power furnaces, converters, casting wheels, boilers and electric generators. Diesel oil is a backup for all these uses. We use diesel oil for mining equipment at our operations.

Electricity: Electricity is used as the main energy source at our mining complexes. We purchase electricity from the *Comision Federal de Electricidad*, the Federal Electricity Commission, (“CFE”), the state’s electrical power producer. In addition, we recover some energy from waste heat boilers at the La Caridad smelter. Accordingly, a significant portion of our operating costs in Mexico are dependent upon the pricing policies of CFE, as well as PEMEX, which reflect government policy, as well as international market prices for crude oil, natural gas and conditions in the refinery markets.

Mexico Generadora de Energia S. de R. L., (“MGE”), an indirect subsidiary of Grupo Mexico, has completed the construction of one of the two power plants designed to supply power to some of the Company’s Mexican operations. It is expected that MGE will supply approximately 12% of its power output to third party energy users. These plants are natural gas-fired combined cycle power generating units, with a net total capacity of 516.2 megawatts. In December 2012, we signed a power supply agreement with MGE, whereby MGE will supply us with power through 2032. The first plant was completed in June 2013 and is supplying us power since December 2013. The second plant is expected to be completed by the end of the second quarter of 2014.

Water: In Mexico, water is deemed a public property and industries not connected to a public service water supply must obtain a water concession from *Comision Nacional del Agua* (the “National Water Commission,” or “CNA”). Water usage fees are established in the *Ley Federal de Derechos* (the Federal Law of Rights), which distinguishes several availability zones with different fees per unit of volume according to each zone, with the exception of Mexicana de Cobre. All of our operations have one or several water concessions and pump out the required water from wells. Mexicana de Cobre pumps water from the La

Angostura dam, which is close to the mine and plants. At our Buenavista facility, we maintain our own wells and pay the CNA for water usage. Water conservation committees have been established in each plant in order to conserve and recycle water. Water usage fees are updated on a yearly basis and have been increasing in recent years. In December 2013, Federal law pertaining to water rights was amended to change the method used to determine water usage fees for underground and surface water effective January 1, 2014. In 2014, we expect that the increase in usage fees will have an after tax cost of approximately $20 million.

ENVIRONMENTAL MATTERS

For a discussion of environmental matters reference is made to the information contained under the caption “Environmental matters” in Note 13 “Commitments and Contingencies” of the consolidated financial statements.

MINING RIGHTS AND CONCESSIONS

Peru

We have 179,520 hectares in concessions from the Peruvian government for our exploration, exploitation, extraction and/or production operations, distributed among our various sites as follows:

|  | Toquepala (hectares) | Cuajone | Ilo | Other | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Plants | 300 | 456 | 421 | — | 1,177 |
| Operations | 22,549 | 22,155 | 4,609 | 35,058 | 84,371 |
| Exploration | — | — | — | 93,972 | 93,972 |
| Total | 22,849 | 22,611 | 5,030 | 129,030 | 179,520 |

We believe that our Peruvian concessions are in full force and in effect under applicable Peruvian laws and that we are in compliance with all material terms and requirements applicable to these concessions. The concessions have indefinite terms, subject to our payment of concession fees of up to $3.00 per hectare annually for the mining concessions and a fee based on nominal capacity for the processing concessions. Fees paid during 2013, 2012 and 2011, were approximately $1.2 million, $1.3 million and $1.2 million, respectively. We have two types of mining concessions in Peru: metallic and non-metallic concessions.

In September 2011, the Peruvian Congress approved an amendment to the mining royalty charge. The new mining royalty charge is based on operating income margins with graduated rates ranging from 1% to 12%, with a minimum royalty charge assessed at 1% of net sales. If the operating income margin is 10% or less, the royalty charge is 1% and for each 5% increment in the operating income margin, the royalty charge rate increases by 0.75%, up to a maximum of 12%. Under the prior law the royalty was based on sales and calculated on the value of concentrates. In 2013, 2012 and 2011, we made provisions of $34.8 million, $51.0 million and $71.8 million, respectively, for this charge.

At the same time the Peruvian Congress amended the mining royalty charge, it enacted a new tax for the mining industry. This tax is also based on operating income and its rates range from 2% to 8.4%. For additional information see Note 7 “Income Taxes” to the consolidated financial statements.

Mexico

In Mexico we have approximately 535,932 hectares in concessions from the Mexican government for our exploration and exploitation activities as outlined on the table below.

|  | IMMSA (hectares) | La Caridad | Buenavista | Projects | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Mine concessions | 187,700 | 104,999 | 82,779 | 160,454 | 535,932 |

We believe that our Mexican concessions are in full force and in effect under applicable Mexican laws and that we are in compliance with all material terms and requirements applicable to these concessions. Under Mexican law, mineral resources belong to the Mexican nation and a concession from the Mexican federal government is required to explore or mine mineral reserves. Mining concessions have a 50-year term that can be renewed for another 50 years. Holding fees for mining concessions can be from $0.4 to $9.5 per hectare depending on the beginning date of the mining concession. Fees paid during 2013, 2012 and 2011 were approximately $5.6 million, $4.5 million and $3.5 million, respectively. In addition, all of our operating units in Mexico have water concessions that are in full force and effect. Although ownership is not required in order to explore or mine a concession, we generally own the land related to our Mexican concessions. We also own all of the processing facilities of our Mexican operations and the land on which they are constructed.

In December 2013, the Mexican government enacted a new law which, among other things, established a mining royalty charge of 7.5% on taxable EBITDA and an additional royalty charge of 0.5% on net sales value of gold, silver and platinum. These charges are effective January 2014 and are deductible for income tax purposes.

## Risk factors

As filed, 38,788 characters.

Every investor or potential investor in Southern Copper Corporation should carefully consider the following risk factors.

### General Risks Relating to Our Business

***Our financial performance is highly dependent on the price of copper and the other metals we produce.***

Our financial performance is significantly affected by the market prices of the metals that we produce, particularly the market prices of copper, molybdenum, zinc and silver. Historically, these prices have been subject to wide fluctuations and are affected by numerous factors beyond our control, including international economic and political conditions, levels of supply and demand, the availability and costs of substitutes, inventory levels maintained by users, actions of participants in the commodities markets and currency exchange rates. In addition, the market prices of copper and certain other metals have on occasion been subject to rapid short-term changes.

The table below provides the sales value of our products as a percentage of our total net sales value.

| Product | Year Ended December 31, 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Copper | 78.2% | 77.0% | 76.7% |
| Molybdenum | 6.6% | 6.8% | 8.0% |
| Silver | 6.6% | 7.4% | 7.2% |
| Zinc | 3.4% | 2.9% | 3.1% |
| Other by-products | 5.2% | 5.9% | 5.0% |

See also historical average price of our products on Item 1 Business caption “Metals prices.”

We cannot predict whether metals prices will rise or fall in the future. Future declines in metals prices and, in particular, copper will have an adverse impact on our results of operations and financial condition. In very adverse market conditions, we might, consider curtailing or modifying certain of our mining and processing operations.

***Changes in the level of demand for our products could adversely affect our product sales.***

Our revenue is dependent on the level of industrial and consumer demand for the concentrates and refined and semi-refined metal products we sell. Changes in technology, industrial processes and consumer habits may affect the level of demand to the extent that changes increase or decrease the need for our metal products. A change in demand, including any change resulting from economic slow-downs or recessions, could impact our results of operations and financial condition.

***Our actual reserves may not conform to our current estimates of our ore deposits and we depend on our ability to replenish ore reserves for our long-term viability.***

There is a degree of uncertainty attributable to the calculation of reserves. Until reserves are actually mined and processed, the quantity of ore and grades must be considered as estimates only. The proven and probable ore reserves data included in this report are estimates prepared by us based on evaluation methods generally used in the mining industry. We may be required in the future to revise our reserves estimates based on our actual production. We cannot assure you that our actual reserves conform to geological, metallurgical or other expectations or that the estimated volume and grade of ore will be recovered. Market prices of our metals, increased production costs, reduced recovery rates, short-term operating factors, royalty charges and other factors may render proven and probable reserves uneconomic to exploit and may result in revisions of reserves data from time to time. Reserves data are not indicative of future results of operations. Our reserves are depleted as we mine. We depend on our ability to replenish our ore reserves for our long-term viability. We use several strategies to replenish and increase our ore reserves, including exploration and investment in properties located near our existing mine sites and investing in technology that could extend the life of a mine by allowing us to cost-effectively process ore types that were previously considered uneconomic. Acquisitions may also contribute to increase ore reserves and we review potential acquisition opportunities on a regular basis. However, we cannot assure you that we will be able to continue with our strategy to replenish reserves indefinitely.

***Our business requires levels of capital expenditures which we may not be able to maintain.***

Our business is capital intensive. Specifically, the exploration and exploitation of copper and other metal reserves, mining, smelting and refining costs, the maintenance of machinery and equipment and compliance with laws and regulations require significant capital expenditures. We must continue to invest capital to maintain or to increase the amount of copper reserves that we exploit and the amount of copper and other metals we produce. We cannot assure you that we will be able to maintain our production levels to generate sufficient cash, or that we have access to sufficient financing to continue our exploration, exploitation and refining activities at or above present levels.

***Restrictive covenants in the agreements governing our indebtedness and the indebtedness of our Minera Mexico subsidiary may restrict our ability to pursue our business strategies.***

Our financing instruments and those of our Minera Mexico subsidiary include financial and other restrictive covenants that, among other things, limit our and Minera Mexico’s abilities to incur additional debt and sell assets. If either we or our Minera Mexico subsidiary do not comply with these obligations, we could be in default under the applicable agreements which, if not addressed or waived, could require repayment of the indebtedness immediately. Our Minera Mexico subsidiary is further limited by the terms of its outstanding notes, which also restrict the Company’s applicable incurrence of debt and liens. In addition, future credit facilities may contain limitations on our incurrence of additional debt and liens, on our ability to dispose of assets, or on our ability to pay dividends to our common stockholders.

***Applicable law restricts the payment of dividends from our Minera Mexico subsidiary to us.***

Our subsidiary, Minera Mexico, is a Mexican company and, as such, may pay dividends only out of net income that has been approved by the shareholders. Shareholders must also approve the actual dividend payment, after mandatory legal reserves have been created and losses for prior fiscal years have been satisfied. These legal constraints may limit the ability of Minera Mexico to pay dividends to us, which in turn, may have an impact on our ability to pay stockholder dividends or to service debt.

### Our operations are subject to risks, some of which are not insurable.

The business of mining, smelting and refining copper, zinc and other metals is subject to a number of risks and hazards, including industrial accidents, labor disputes, unusual or unexpected geological conditions, changes in the regulatory environment, environmental hazards, weather and other natural phenomena, such as, seismic activity. Such occurrences could result in damage to, or destruction of, mining operations resulting in monetary losses and possible legal liability. In particular, surface and underground mining and related processing activities present inherent risks of injury to personnel and damage to equipment. We maintain insurance against many of these and other risks, which in certain circumstances may not provide adequate coverage. Insurance against certain risks, including certain liabilities for environmental damage or hazards as a result of exploration and production, is not generally available to us or other companies within the mining industry. Nevertheless recent environmental legal initiatives have considered future regulations regarding environmental damage insurance. In case such regulations come into force, we will have to analyze the need to obtain such insurance. We do not have, and do not intend to obtain, political risk insurance. These or other uninsured events may adversely affect our financial condition and the results of operations.

***Deliveries under our copper sales agreements can be suspended or cancelled by our customers in certain cases.***

Under our sales agreements, we or our customers may suspend or cancel delivery of copper during a period of force majeure. Events of force majeure under these agreements include acts of nature, labor strikes, fires, floods, wars, transportation delays, government actions or other events that are beyond the control of the parties. Any suspension or cancellation by our customers of deliveries under our sales contracts that are not replaced by deliveries under new contracts or sales on the spot market would reduce our cash flow and could adversely affect our financial condition and results of operations.

### The copper mining industry is highly competitive.

We face competition from other copper mining and producing companies around the world. We cannot assure you that competition will not adversely affect us in the future.

In addition, mines have limited lives and, as a result, we must periodically seek to replace and expand our reserves by acquiring new properties. Significant competition exists to acquire properties producing or capable of producing copper and other metals.

The mining industry has experienced significant consolidation in recent years, including consolidation among some of our main competitors, as a result an increased percentage of copper production is from companies that also produce other products and may, consequently, be more diversified than we are. We cannot assure you that the result of current or future consolidation in the industry will not adversely affect us.

Potential changes to international trade agreements, trade concessions or other political and economic arrangements may benefit copper producers operating in countries other than Peru and Mexico, where our mining operations are currently located. We cannot assure you that we will be able to compete on the basis of price or other factors with companies that may benefit from future favorable trading or other arrangements.

***Interruptions of energy supply or increases in energy costs and other production costs may adversely affect our results of operations.***

We require substantial amounts of fuel oil, electricity and other resources for our operations. Fuel, gas and power costs constituted approximately 34.7% and 34.8% of our total production cost in 2013 and 2012, respectively. We rely upon third parties for our supply of the energy resources consumed in our operations. The prices for and availability of energy resources may be subject to change or curtailment, respectively, due to, among other things, new laws or regulations, imposition of new taxes or tariffs, interruptions in production by suppliers, worldwide price levels and market conditions. Disruptions in energy supply or increases in costs of energy resources or increases of other production costs could have a material adverse effect on our financial condition and results of operations.

***Shortages of water supply, critical parts, equipment and skilled labor may adversely affect our operations and development projects.***

Our mining operations require significant quantities of water for mining, ore processing and related support facilities. Although each operation currently has sufficient water rights to cover its operational demands, the loss of some or all water rights for any of our mines or operations, in whole or in part, or shortages of water to which we have rights could require us to curtail or shut down mining production and could prevent us from pursuing expansion opportunities. Additionally, we have not yet secured adequate water rights to support all of our announced expansion projects, and our inability to secure those rights could prevent us from pursuing some of those opportunities. In addition, future shortages of critical parts, equipment and skilled labor could adversely affect our operations and development projects.

***Our results and financial condition are affected by global and local market conditions.***

We are subject to the risks arising from adverse changes in domestic and global economic and political conditions. Our industry is cyclical by nature and fluctuates with economic cycles.

Weakness in the global economy can be marked by, among other adverse factors, lower levels of consumer and corporate confidence, decreased business investment, lower consumer spending, increased unemployment, reduced income and asset values in many areas, currency volatility and limited availability of credit and access to capital.

Concerns over weaknesses in the global economy may prompt our customers to slow down or reduce the purchase of our products. We may experience longer sales cycles, difficulty in collecting sales proceeds, and lower prices for our products. A change in the demand of our products could impact our results of operations and financial condition. We cannot provide any assurance that any of these events will not have a material adverse effect on market conditions, prices of our securities, our ability to obtain financing, and our results of operations and financial condition.

***Environmental, health and safety laws, regulatory response to climate change, and other regulations may increase our costs of doing business, restrict our operations or result in operational delays.***

Our exploration, mining, milling, smelting and refining activities are subject to a number of Peruvian and Mexican laws and regulations, including environmental laws and regulations, as well as certain industry technical standards. Additional matters subject to regulation include, but are not limited to, concession fees, transportation, production, water use and discharge, power use and generation, use and storage of explosives, surface rights, housing and other facilities for workers, reclamation, taxation, labor standards, mine safety and occupational health.

We are required to comply with occupational health and safety laws and regulations in Peru and Mexico where our operations are subject to periodic inspections by the relevant governmental authorities. These laws and regulations govern, among others, health and safety work place conditions, including high risk labor and the handling, storage and disposal of chemical and other hazardous substances. We believe our operations are in compliance in all material respects with applicable health and safety laws and regulations in the countries in which we operate. Compliance with these laws and regulations and new or existing regulations that may be applicable to us in the future could increase our operating costs and adversely affect our financial results of operations and cash flows.

We regularly monitor occupational health and safety performance and compliance through programs, reports and activities at our operations. Accidents are reported to Mexican and Peruvian authorities as required. In 2013, we did not have fatalities in Peru or in Mexico. In 2012, we had three fatalities in Mexico, three contractor employees and three fatalities in Peru, two Company employees and one contractor employee. The amounts paid to the Mexican and Peruvian authorities for reportable accidents did not have a material impact on our results. Under Mexican and Peruvian law penalties and fines for safety violations are generally monetary, but in certain cases may lead to the temporary or permanent shutdown of the affected facility or the suspension or revocation of permits or licenses. In 2013 and 2012, we were not subject to material penalties or sanctions and we did not experience any shutdowns of our work areas. Also, violation of security and safety laws and regulations in our Peruvian operations can be considered a crime, with a sentence of up to 10 years of prison.

Environmental regulations in Peru and Mexico have become increasingly stringent over the last decade and we have been required to dedicate more time and money to compliance and remediation activities. Furthermore, Mexican authorities have become more rigorous and strict in enforcing Mexican environmental laws. We expect additional laws and regulations will be enacted over time with respect to environmental matters.

The principal legislation applicable to our Mexican operations is the Federal General Law of Ecological Balance and Environmental Protection (the “General Law”), which is enforced by the Federal Bureau of Environmental Protection. Article 180 of this Law was amended in 2011. This amendment eases the ability for an individual or entity to contest administrative acts, including environmental authorizations, permits or concessions. As a result, more legal actions supported or sponsored by non-governmental groups, interested in halting projects, and not necessarily in protecting the rights of affected communities may be filed against us. Additionally, amendments to the Civil Federal Procedures Code and the enforcement of the Environmental Liability Federal Law may result in more litigation, including suspension of the activities alleged to cause harm and/or economic fines.

In 2003 and 2005, Peruvian environmental laws imposing closure and remediation obligations on the mining industry were enacted. Additionally, future changes to environmental laws and regulations could increase the extent of reclamation and remediation work required to be performed by us. Any such increases in future costs could materially impact the amounts charged to operations for reclamation and remediation.

In 2012, we decided to recognize an estimated asset retirement obligation for our mining properties in Mexico as part of our environmental commitment. Even though, there is currently no enacted law, statute, ordinance, or written or oral contract requiring us to carry out mine closure and environmental remediation activities, we believe that a constructive obligation presently exists based on, among other things, our remediation experience from the closure of the San Luis Potosi smelter in 2010. Moreover, our Mexican operations are also subject to the environmental agreement entered into by Mexico, the United States and Canada in connection with the North American Free Trade Agreement. This agreement, as well as new international treaties regarding human rights, contains environmental provisions and initiatives. We believe our operations are in material compliance with all environmental laws and regulations within the areas we operate.

Regulatory response to climate change, restrictions, caps, taxes, or other controls on emissions of greenhouse gasses, including on emissions from the combustion of carbon-based fuels, could significantly increase our operating costs. Restrictions on emissions could also affect our customers. A number of governments or governmental bodies have introduced or are contemplating regulatory changes in response to the potential impacts of climate change. These regulatory initiatives will be either voluntary or mandatory and may impact our operations directly or through our suppliers or customers.

Our Peruvian operations are affected by environmental regulations which establish stringent air quality standards. The Peruvian environmental agency has designated three atmospheric basins that require further attention to comply with these air quality standards. The Ilo basin is one of these three areas. We expect to join the local government and other stakeholders in the Ilo basin to develop the action plan and evaluate alternatives and their feasibility in order to achieve these new air quality standards.

Additionally, in 2013, the Peruvian government enacted new soil environmental quality standards applicable to any existing facility or project that generates or could generate risk of soil contamination in its area of operation or influence. The rule applies to any existing facility or project and requires the company to report a soil testing analysis. We are waiting the complementary regulations to determine the impact of this rule.

The potential physical impacts of climate change on our operations are highly uncertain, and would be particular to the geographic location of our facilities. These may include changes in rainfall patterns, water shortages, changing sea levels, changing storm patterns and intensities, and changing temperatures. These effects may adversely impact the cost, production and financial performance of our operations.

The development of more stringent environmental protection programs in Peru and Mexico and in relevant trade agreements could impose constraints and additional costs on our operations requiring us to make significant capital expenditures in the future. We cannot assure you that current or future legislative, regulatory or trade developments will not have an adverse effect on our business, properties, operating results, financial condition or prospects.

***Our metals exploration efforts are highly speculative in nature and may be unsuccessful.***

Metals exploration is highly speculative in nature, involves many risks and is frequently unsuccessful. Once mineralization is discovered, it may take a number of years from the initial phases of drilling before production is possible, during which time the economic feasibility of production may change. Substantial expenditures are required to establish proven and probable ore reserves through drilling, to determine metallurgical processes to extract the metals from the ore and, in the case of new properties, to construct mining and processing facilities. We cannot assure you that our exploration programs will result in the expansion or replacement of current production with new proven and probable ore reserves.

Development projects have no operating history upon which we can base estimates of proven and probable ore reserves and estimates of future cash operating costs. Estimates are, to a large extent, based upon the interpretation of geological data obtained from drill holes and other sampling techniques, and feasibility studies that derive estimates of cash operating costs based upon anticipated tonnage and grades of ore to be mined and processed, the configuration of the ore body, expected recovery rates of the mineral from the ore, comparable facility and equipment operating costs, anticipated climatic conditions and other factors. As a result, actual cash operating costs and economic returns based upon development of proven and probable ore reserves may differ significantly from those originally estimated. Moreover, significant decreases in actual or expected prices may mean reserves, once found, will be uneconomical to produce.

### We may be adversely affected by challenges relating to slope stability.

Our open-pit mines get deeper as we mine them, presenting certain geotechnical challenges including the possibility of slope failure. If we are required to decrease pit slope angles or provide additional road access to prevent such a failure, our stated reserves could be negatively affected. Further, hydrological conditions relating to pit slopes, renewal of material displaced by slope failures and increased stripping requirements could also negatively affect our stated reserves. We have taken actions in order to maintain slope stability, but we cannot assure you that we will not have to take additional action in the future or that our actions taken to date will be sufficient. Unexpected failure or additional requirements to prevent slope failure may negatively affect our results of operations and financial condition, as well as have the effect of diminishing our stated ore reserves.

### We may be adversely affected by labor disputes.

In the last several years we have experienced a number of strikes or other labor disruptions that have had an adverse impact on our operations and operating results. As of December 31, 2013, unions represented approximately 70.6% of our workforce. Currently, we have labor agreements in effect for our Mexican and Peruvian operations.

Our Taxco and San Martin mines in Mexico, have been on strike since July 2007. It is expected that operations at these mines will remain suspended until these labor issues are resolved.

We cannot assure you when these strikes will be settled, or that in the future we will not experience strikes or other labor related work stoppages that could have a material adverse effect on our financial condition and results of operations.

***Our new mining or metal production projects may be subject to additional costs due to community actions and other factors.***

In recent years worldwide mining activity has been pressured by neighboring communities for financial commitments to fund social benefit programs and infrastructure improvements. Our projects in Peru are not exempt from these pressures. Our Tia Maria mine and Toquepala expansion projects in Peru have been delayed as we are trying to resolve difference with community groups. Please see further details in Note 13 “Commitment and Contingencies - Other contingencies”.

It appears that it is becoming a part of the Peruvian mining environment, that in order to obtain acceptance from local communities for projects in their localities, demands for substantial investments in community infrastructure and upgrades must be met in order to proceed with the mining projects.

We are confident that we will continue with the Tia Maria mine and the Toquepala expansion projects. However, we cannot assure you that we will not continue to incur additional costs for community infrastructure and upgrades in order to obtain the approval of current or future mining projects.

***We are controlled by Grupo Mexico, which exercises control over our affairs and policies and whose interests may be different from yours.***

At December 31, 2013, Grupo Mexico owned indirectly 82.3% of our capital stock. Certain of our and Minera Mexico’s officers and directors are also directors and/or officers of Grupo Mexico and/or of its affiliates. We cannot assure you that the interests of Grupo Mexico will not conflict with our minority stockholders.

Grupo Mexico has the ability to determine the outcome of substantially all matters submitted for a vote to our stockholders and thus exercises control over our business policies and affairs, including the following:

- the composition of our Board of Directors and, as a result, any determinations of our Board with respect to our business direction and policy, including the appointment and removal of our officers;
- determinations with respect to mergers and other business combinations, including those that may result in a change of control;
- whether dividends are paid or other distributions are made and the amount of any dividends or other distributions;
- sales and dispositions of our assets; and
- the amount of debt financing that we incur.

We cannot assure you that increased financial obligations of Grupo Mexico or AMC resulting from financings or for other reasons will not result in our parent corporations obtaining loans, increased dividends or other funding from us.

In addition, we have in the past engaged in, and expect to continue to engage in, transactions with Grupo Mexico and its other affiliates which are related party transactions and may present conflicts of interest. For additional information regarding the share ownership of, and our relationships with, Grupo Mexico and its affiliates, see Note 18 “Related Party Transactions.”

***We may not continue to pay a significant amount of our net income as cash dividends on our common stock in the future.***

We have distributed a significant amount of our net income as dividends since 1996. Our dividend practice is subject to change at the discretion of our Board of Directors at any time. The amount that we pay in dividends is subject to a number of factors, including our results of operations, financial condition, cash requirements, tax considerations, future prospects, legal restrictions, contractual restrictions in credit agreements, limitations imposed by the government of Peru, Mexico or other countries where we have significant operations and other factors that our Board of Directors may deem relevant. In light of our capital investment program and the current global economic conditions, it is possible that future dividend distributions will be reduced from the levels of recent years.

### International Risks

We are a company with substantial assets located outside of the United States. We conduct production operations in Peru and Mexico and exploration activities in these countries as well as in Chile, Argentina and Ecuador. Accordingly, in addition to the usual risks associated with conducting business in foreign countries, our business may be adversely affected by political, economic and social uncertainties in each of these countries. Such risks include possible expropriation or nationalization of property, confiscatory taxes or royalties, possible foreign exchange controls, changes in the national policy toward foreign investors, extreme environmental standards, etc.

Our insurance does not cover most losses caused by the above described risks. Consequently, our production, development and exploration activities in these countries could be substantially affected by factors beyond our control, some of which could materially and adversely affect our financial position or results of operations.

### Risks Associated with Doing Business in Peru and Mexico

***There is uncertainty as to the termination and renewal of our mining concessions.***

Under the laws of Peru and Mexico, mineral resources belong to the state and government concessions are required in both countries to explore for or exploit mineral reserves. In Peru, our mineral rights derive from concessions from MINEM for our exploration, exploitation, extraction and/or production operations. In Mexico, our mineral rights derive from concessions granted, on a discretionary basis, by the Ministry of Economy, pursuant to Mexican mining law and regulations thereunder.

Mining concessions in both Peru and Mexico may be terminated if the obligations of the concessioner are not satisfied. In Peru, we are obligated to pay certain fees for our mining concession. In Mexico, we are obligated, among other things, to explore or exploit the relevant concession, to pay any relevant fees, to comply with all environmental and safety standards, to provide information to the Ministry of Economy and to allow inspections by the Ministry of Economy. Any termination or unfavorable modification of the terms of one or more of our concessions, or failure to obtain renewals of such concessions subject to renewal or extensions, could have a material adverse effect on our financial condition and prospects.

***Peruvian economic and political conditions may have an adverse impact on our business.***

A significant part of our operations are conducted in Peru. Accordingly, our business, financial condition or results of operations could be affected by changes in economic or other policies of the Peruvian government or other political, regulatory or economic developments in the country. During the past several decades, Peru has had a succession of regimes with differing policies and programs. Past governments have frequently intervened in the nation’s economy and social structure. Among other actions, past governments have imposed controls on prices, exchange rates and local and foreign investments, as well as limitations on imports, have restricted the ability of companies to dismiss employees and have prohibited the remittance of profits to foreign investors.

In more recent years Peru has had political and social stability. The Peruvian government’s economic policies reduced inflation and the Peruvian economy has experienced significant growth. On October 5, 2014 Peru will hold regional and mayor elections and, in 2016, a new presidential election. Peruvian law prohibits the immediate reelection of the current president.

Because we have significant operations in Peru, we cannot provide any assurance that political developments and economic conditions in Peru and/or other factors will not have a material adverse effect on market conditions, prices of our securities, our ability to obtain financing, and our results of operations and financial condition.

***Mexican economic and political conditions, as well as drug-related violence, may have an adverse impact on our business.***

The Mexican economy is highly sensitive to economic developments in the United States, mainly because of its high level of exports to the United States market. The recent global financial crisis and the subsequent downturn in the United States economy caused real gross domestic product in Mexico to decrease 6.6% in 2009. Mexico’s policy measures in response to the crisis and its prior economic performance have helped the economy begin a recovery. Gross domestic product grew by 1.3% and 3.8% in 2013 and 2012, respectively, and the Bank of Mexico expects a growth between 3% and 4% in 2014. Other risks in Mexico are increases in taxes on the mining sector and higher royalties as was just enacted in December 2013. As has occurred in other metal producing countries, the mining industry may be perceived as a source of additional fiscal revenue.

Regarding the political situation in Mexico, security institutions are under significant stress, as a result of drug-related violence. This situation creates potential risks especially for transportation of minerals and finished products, which affect a small part of our production. However, drug-related violence has had a limited impact on our operations as it has tended to concentrate outside our areas of production. If this were to change, the risk to our operations might increase.

Because we have significant operations in Mexico, we cannot provide any assurance that political developments and economic conditions, as well as drug-related violence, in Mexico will not have a material adverse effect on market conditions, prices of our securities, our ability to obtain financing, and our results of operations and financial condition.

***Peruvian inflation and fluctuations in the nuevo sol exchange rate may adversely affect our financial condition and results of operations.***

Although the U.S. dollar is our functional currency and our revenues are primarily denominated in U.S. dollars, due to the countries we operate, portions of our operating costs are denominated in Peruvian nuevos soles. Accordingly, when inflation or deflation in Peru is not offset by a change in the exchange rate of the Nuevo sol, our financial position, results of operations, cash flows and the market price of our common stock, could be affected.

Over the past several years, Peru has experienced one of its best economic periods. Inflation in 2013, 2012 and 2011 was 2.9%, 2.6% and 4.8%, respectively. The value of the nuevo sol has devaluated against the U.S. dollar 9.6% in 2013 and appreciated against the U.S. dollar, 5.4% in 2012 and 4.0% in 2011. Although the Peruvian government’s economic policy reduced inflation and the economy has experienced significant growth in recent years, we cannot assure you that inflation will not increase from its current level or that such growth will continue in the future at similar rates or at all. Additionally a global financial economic crisis, could negatively affect the Peruvian economy.

To manage the volatility related to the risk of currency rate fluctuations, we may enter into forward exchange contracts. We cannot assure you, however, that currency fluctuations will not have an impact on our financial condition and results of operations.

***Mexican inflation, restrictive exchange control policies and fluctuations in the peso exchange rate may adversely affect our financial condition and results of operations.***

Although all of our Mexican operations’ sales of metals are priced and invoiced in U.S. dollars, a substantial portion of its costs are denominated in pesos. Accordingly, when inflation in Mexico increases without a corresponding depreciation of the peso the net income generated by our Mexican operations is adversely affected. The annual inflation rate in Mexico was 4.0% in 2013, 3.6% in 2012 and 3.8% in 2011. The Bank of Mexico has publicly announced a target of 3.8% inflation for 2014.

At the same time, the peso has been subject in the past to significant volatility, which may not have been proportionate to the inflation rate and may not be proportionate to the inflation rate in the future. The value of the peso to the U.S. dollar decreased by 0.5% in 2013, increased by 6.9% in 2012, and decreased by 13.1% in 2011.

The Mexican government does not currently restrict the ability of Mexican companies or individuals to convert pesos into dollars or other currencies. While we do not expect the Mexican government to impose any restriction or exchange control policies in the future, it is an area we closely monitor. We cannot assure you the Mexican government will maintain its current policies with regard to the peso or that the peso’s value will not fluctuate significantly in the future. The imposition of exchange control policies could impair Minera Mexico’s ability to obtain imported goods and to meet its U.S. dollar-denominated obligations and could have an adverse effect on our business and financial condition.

***Developments in other emerging market countries and in the United States may adversely affect the prices of our common stock and our debt securities.***

The market value of securities of companies with significant operations in Peru and Mexico is, to varying degrees, affected by economic and market conditions in other emerging market countries. Although economic conditions in such countries may differ significantly from economic conditions in Peru or Mexico, as the case may be, investors’ reactions to developments in any of these other countries may have an adverse effect on the market value or trading price of the securities, including debt securities, of issuers that have significant operations in Peru or Mexico.

In addition, in recent years economic conditions in Mexico have increasingly become correlated to U.S. economic conditions. Therefore, adverse economic conditions in the United States could also have a significant adverse effect on Mexican economic conditions, including the price of our common stock or debt securities.

We cannot assure you that the market value or trading prices of our common stock and debt securities, will not be adversely affected by events in the United States or elsewhere, including in emerging market countries.

## Properties

As filed, 137,370 characters.

We were incorporated in Delaware in 1952. Our corporate offices in the United States are located at 1440 East Missouri Avenue Suite 160, Phoenix, Arizona 85014. Our Phoenix telephone number is (602) 264-1375. Our corporate offices in Mexico are located in Mexico City and our corporate offices in Peru are located in Lima. Our website is www.southerncoppercorp.com. We believe that our existing properties are in good condition and suitable for the conduct of our business.

REVIEW OF OPERATIONS

The following maps set forth the locations of our principal mines, smelting facilities and refineries. We operate open-pit copper mines in the southern part of Peru — at Toquepala and Cuajone — and in Mexico, principally at La Caridad and Buenavista. We also operate five underground mines that produce zinc, copper, silver and gold, as well as a coal mine and a coke oven.

#### EXTRACTION, SMELTING AND REFINING PROCESSES

Our operations include open-pit and underground mining, concentrating, copper smelting, copper refining, copper rod production, solvent extraction/electrowinning (SX-EW), zinc refining, sulfuric acid production, molybdenum concentrate production and silver and gold refining. The extraction and production process are summarized below.

#### OPEN-PIT MINING

In an open-pit mine, the production process begins at the mine pit, where waste rock, leaching ore and copper ore are drilled and blasted and then loaded onto diesel-electric trucks by electric shovels. Waste is hauled to dump areas and leaching ore is hauled to leaching dumps. The ore to be milled is transported to the primary crushers.

#### UNDERGROUND MINING

In an underground mine, the production process begins at the stopes, where copper, zinc and lead veins are drilled and blasted and the ore is hauled to the underground crusher station. The crushed ore is then hoisted to the surface for processing.

#### CONCENTRATING

The copper ore with a copper grade over 0.4% from the primary crusher or the copper, zinc and lead-bearing ore from the underground mines is transported to a concentrator plant where gyratory crushers break the ore into sizes no larger than three-quarter of an inch. The ore is then sent to a mill section where it is ground to the consistency of fine powder. The finely ground ore is mixed with water and chemical reagents and pumped as a slurry to the flotation separator where it is mixed with certain chemicals. In the flotation separator, reagent solutions and air pumped into the flotation cells cause the minerals to separate from the waste rock and bubble to the surface where they are collected and dried.

If the bulk concentrated copper contains molybdenum it is first processed in a molybdenum plant as described below under “Molybdenum Production.”

#### COPPER SMELTING

Copper concentrates are transported to a smelter, where they are smelted using a furnace, converter and anode furnace to produce either blister copper (which is in the form of cakes with air pockets) or copper anodes (which are cleaned of air pockets). At the smelter, the concentrates are mixed with flux (a chemical substance intentionally included for high temperature processing) and then sent to reverberatory furnaces producing copper matte and slag (a mixture of iron and other impurities). Copper matte contains approximately 65% copper. Copper matte is then sent to the converters, where the material is oxidized in two steps: (i) the iron sulfides in the matte are oxidized with silica, producing slag that is returned to the reverberatory furnaces, and (ii) the copper contained in the matte sulfides is then oxidized to produce copper that, after casting, is called blister copper, containing approximately 98% to 99% copper, or anodes, containing approximately 99.7% copper. Most of the blister and anode production is sent to the refinery and the remainder is sold to customers.

#### COPPER REFINING

Anodes are suspended in tanks with a solution containing water, sulfuric acid and copper sulfate. A weak electrical current is passed through the anodes and chemical solution and the dissolved copper is deposited on very thin starting sheets to produce copper cathodes containing approximately 99.99% copper. During this process, silver, gold and other metals (for example, palladium, platinum and selenium), along with other impurities, settle on the bottom of the tank (anodic muds). This anodic mud is processed at a precious metal plant where selenium, silver and gold are recovered.

#### COPPER ROD PLANT

To produce copper rod, copper cathodes are first smelted in a furnace and then dosified in a casting machine. The dosified copper is then extruded and passed through a cooling system that begins solidification of copper into a 60´50 millimeter copper bar. The resulting copper bar is gradually stretched in a rolling mill to achieve the desired diameter. The rolled bar is then cooled and sprayed with wax as a preservation agent and collected into a rod coil that is compacted and sent to market.

#### SOLVENT EXTRACTION/ELECTROWINNING (SX-EW)

A complementary processing method is the leaching and SX-EW process. During the SX-EW process, low-grade sulfides ore with a copper grade and copper oxides are leached with sulfuric acid to allow copper content recovery. The acid and copper solution is then agitated with a solvent that contains chemical additives that attract copper ions. As the solvent is lighter than water, it floats to the surface carrying with it the copper content. The solvent is then separated using an acid solution, freeing the copper. The acid solution containing the copper is then moved to electrolytic extraction tanks to produce copper cathodes.

#### MOLYBDENUM PRODUCTION

Molybdenum is recovered from copper-molybdenum concentrates produced at the concentrator. The copper-molybdenum concentrate is first treated with a thickener until it becomes slurry with 60% solids. The slurry is then agitated in a chemical and water solution and pumped to the flotation separator. The separator creates a froth that carries molybdenum to the surface but not the copper mineral (which is later filtered to produce copper concentrates containing approximately 27% copper). The molybdenum froth is skimmed off, filtered and dried to produce molybdenum concentrates of approximately 58% contained molybdenum.

#### ZINC REFINING

Metallic zinc is produced through electrolysis using zinc concentrates and zinc oxides. Sulfur is eliminated from the concentrates by roasting and the zinc oxide is dissolved in sulfuric acid solution to eliminate solid impurities. The purified zinc sulfide solution is treated by electrolysis to produce refined zinc and to separate silver and gold, which are recovered as concentrates.

#### SULFURIC ACID PRODUCTION

Sulfur dioxide gases are produced in the copper smelting and zinc roasting processes. As a part of our environmental preservation program, we treat the sulfur dioxide emissions at two of our Mexican plants and at Peruvian processing facilities to produce sulfuric acid, some of which is, in turn, used for the copper leaching process, with the rest sold to mining and fertilizer companies located principally in Mexico, Peru, United States, Chile and other countries.

#### SILVER AND GOLD REFINING

Silver and gold are recovered from copper, zinc and lead concentrates in the smelters and refineries, and from slimes through electrolytic refining.

KEY PRODUCTION CAPACITY DATA:

All production facilities are owned by us. The following table sets forth as of December 31, 2013, the locations of production facilities by reportable segment, the processes used, as well as the key production and capacity data for each location:

| Facility Name PERUVIAN OPEN-PIT UNIT Mining Operations | Location | Process | Nominal Capacity (1) | 2013 Production | 2013 Capacity Use |
| --- | --- | --- | --- | ---: | ---: |
| Cuajone open-pit mine | Cuajone (Peru) | Copper ore milling and recovery, copper and molybdenum concentrate production | 87.0 ktpd — ore milled | 81.6 | 93.8% |
| Toquepala open-pit mine | Toquepala (Peru) | Copper ore milling and recovery, copper and molybdenum concentrate production | 60.0 ktpd — ore milled | 56.4 | 94.0% |
| Toquepala SX-EW plant | Toquepala (Peru) | Leaching, solvent extraction and cathode electrowinning | 56.0 ktpy — refined | 28.4 | 50.7% |
| **Processing Operations** |  |  |  |  |  |
| Ilo copper smelter | Ilo (Peru) | Copper smelting, blister, anodes production | 1,200.0 ktpy — concentrate feed | 1,072.8 | 89.4% |
| Ilo copper refinery | Ilo (Peru) | Copper refining | 280 ktpy — refined cathodes | 271.0 | 96.8% |
| Ilo acid plants | Ilo (Peru) | Sulfuric acid | 1,050 ktpy - sulfuric acid | 1,025.8 | 97.7% |
| Ilo precious metals refinery | Ilo (Peru) | Slime recovery & processing, gold & silver refining | 320 tpy | 311.6 | 97.4% |
| **MEXICAN OPEN-PIT UNIT** |  |  |  |  |  |
| **Mining Operations** |  |  |  |  |  |
| Buenavista open-pit mine | Sonora (Mexico) | Copper ore milling & recovery, copper concentrate production | 76.7 ktpd — milling | 69.3 | 90.3% |
| Buenavista SX-EW I, II plants | Sonora (Mexico) | Leaching, solvent extraction & refined cathode electrowinning | 54.8 ktpy (combined) | 66.4 | 121.2% |
| La Caridad open-pit mine | Sonora (Mexico) | Copper ore milling & recovery, copper & molybdenum concentrate production | 91.0 ktpd — milling | 92.1 | 101.2% |
| La Caridad SX-EW plant | Sonora (Mexico) | Leaching, solvent extraction & cathode electrowinning | 21.9 ktpy — refined | 23.9 | 109.1% |
| **Processing Operations** |  |  |  |  |  |
| La Caridad copper smelter | Sonora (Mexico) | Concentrate smelting, anode production | 1,000 ktpy — concentrate feed | 722.6 | 72.3% |
| La Caridad copper refinery | Sonora (Mexico) | Copper refining | 300 ktpy copper cathode | 188.0 | 62.7% |
| La Caridad copper rod plant | Sonora (Mexico) | Copper rod production | 150 ktpy copper rod | 126.8 | 84.5% |
| La Caridad precious metals refinery | Sonora (Mexico) | Slime recovery & processing, gold & silver refining | 1.8 ktpy — slime | 1.1 | 61.2% |
| La Caridad sulfuric acid plant | Sonora (Mexico) | Sulfuric acid | 1,565.5 ktpy — sulfuric acid | 719.5 | 46.0% |

27

| IMMSA UNIT Underground mines |  |  |  |  |  |
| --- | --- | --- | --- | ---: | ---: |
| Charcas | San Luis Potosi (Mexico) | Copper, zinc, lead milling, recovery & concentrate production | 1,460 ktpy — ore milled | 1,180 | 80.8% |
| San Martin (2) | Zacatecas (Mexico) | Lead, zinc, copper & silver mining, milling recovery & concentrate production | 1,606 ktpy — ore milled | — | — |
| Santa Barbara | Chihuahua (Mexico) | Lead, copper and zinc mining & concentrates production | 2,190 ktpy — ore milled | 1,595 | 72.8% |

|  |  |  |  |  |  |
| --- | --- | --- | --- | ---: | ---: |
| Santa Eulalia | Chihuahua (Mexico) | Lead & zinc mining and milling recovery & concentrate production | 547.5 ktpy - ore milled | 290 | 53.0% |
| Taxco (2) | Guerrero (Mexico) | Lead, zinc silver & gold mining recovery & concentrate production | 730 ktpy - ore milled | — | — |
| Nueva Rosita coal & | Coahuila | Clean coal production | 900 ktpy clean coal | 291.5 | 32.4% |
| coke complex(3) | (Mexico) |  | 100 ktpy coke | 93.2 | 93.2% |
| **Processing Operations** |  |  |  |  |  |
| San Luis Potosi zinc refinery | San Luis Potosi (Mexico) | Zinc concentrates refining | 105.0 ktpy zinc cathode | 97.7 | 93.0% |
| San Luis Potosi sulfuric acid plant | San Luis Potosi (Mexico) | Sulfuric acid | 180.0 ktpy sulfuric acid | 175.2 | 97.4% |

ktpd = thousands of tons per day

ktpy = thousands of tons per year

Tpy = tons per year

(1) Our estimates of actual capacity under normal operating conditions with allowance for normal downtime for repairs and maintenance and based on the average metal content for the relevant period.

(2) The Taxco and San Martin mines have been on strike since July 2007.

(3) At December 31, 2013, the coal reserves for the Nueva Rosita coal plant were 100.5 million tons with average sulfur content of 1.1% and a BTU content of 8,503 per pound.

PROPERTY BOOK VALUE

At December 31, 2013, net book values of property are as follows (in millions):

| Peruvian operations: |  |
| --- | ---: |
| Cuajone | $488.3 |
| Toquepala | 614.3 |
| Tia Maria project | 345.1 |
| Ilo and other support facilities | 560.9 |
| Construction in progress | 442.8 |
| Total | $2,451.4 |
| **Mexican open-pit operations:** |  |
| Buenavista | $2,130.5 |
| La Caridad | 874.1 |
| Construction in progress | 533.5 |
| Mexicana del Arco | 41.8 |
| Total | $3,579.9 |
| **Mexican IMMSA unit:** |  |
| San Luis Potosi | $31.8 |
| Zinc electrolytic refinery | 72.8 |
| Charcas | 41.9 |
| San Martin | 15.1 |
| Santa Barbara | 74.4 |
| Taxco | 3.8 |
| Santa Eulalia | 35.3 |
| Nueva Rosita | 20.1 |
| Construction in progress and other facilities | 83.0 |
| Total | $378.2 |
| Mexican administrative offices | $70.3 |
| Intersegment elimination | $(3.6) |
| Total Southern Copper Corporation | $6,476.2 |

29

SUMMARY OPERATING DATA

The following table sets out certain operating data underlying our financial and operating information for each of the periods indicated.

| COPPER (thousand pounds): Mined Peru open-pit | Year Ended December 31, 2013 | 2012 | 2011 | Variance 2013-2012 Volume% |  | 2012-2011 Volume% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Toquepala | 244,031 | 264,794 | 265,390 | (20,763) | (7.8)% | (596) | (0.2)% |
| Cuajone | 371,660 | 350,079 | 308,956 | 21,581 | 6.2% | 41,123 | 13.3% |
| SX-EW Toquepala | 62,611 | 70,976 | 77,872 | (8,365) | (11.8)% | (6,896) | (8.9)% |
| **Mexico open-pit** |  |  |  |  |  |  |  |
| La Caridad | 213,545 | 215,715 | 197,927 | (2,170) | (1.0)% | 17,788 | 9.0% |
| Buenavista | 255,324 | 295,345 | 242,832 | (40,021) | (13.6)% | 52,513 | 21.6% |
| SX-EW La Caridad | 52,636 | 50,284 | 52,587 | 2,352 | 4.7% | (2,303) | (4.4)% |
| SX-EW Buenavista | 146,348 | 145,734 | 137,440 | 614 | 0.4% | 8,294 | 6.0% |
| **IMMSA unit** | 14,136 | 12,915 | 12,189 | 1,221 | 9.5% | 726 | 6.0% |
| **Total Mined** | **1,360,291** | **1,405,842** | **1,295,193** | **(45,551)** | **(3.2)%** | **110,649** | **8.5%** |
| **Smelted** |  |  |  |  |  |  |  |
| **Peru open-pit** |  |  |  |  |  |  |  |
| Blister Ilo | 3,681 | 72,407 | — | (68,726) | (94.9)% | 72,407 | 100% |
| Anodes Ilo | 711,292 | 584,694 | 744,747 | 126,598 | 21.7% | (160,053) | (21.5)% |
| **Mexico open-pit** |  |  |  |  |  |  |  |
| Anodes La Caridad | 486,726 | 575,277 | 510,766 | (88,551) | (15.4)% | 64,511 | 12.6% |
| **Total Smelted** | **1,201,699** | **1,232,378** | **1,255,513** | **(30,679)** | **(2.5)%** | **(23,135)** | **(1.8)%** |
| **Refined** |  |  |  |  |  |  |  |
| **Peru Open-pit** |  |  |  |  |  |  |  |
| Cathodes Ilo | 597,353 | 475,452 | 575,391 | 121,901 | 25.6% | (99,939) | (17.4)% |
| SX-EW Toquepala | 62,611 | 70,976 | 77,872 | (8,365) | (11.8)% | (6,896) | (8.9)% |
| **Mexico Open-pit** |  |  |  |  |  |  |  |
| Cathodes La Caridad | 414,472 | 471,193 | 411,933 | (56,721) | (12.0)% | 59,260 | 14.4% |
| SX-EW La Caridad | 52,636 | 50,284 | 52,587 | 2,352 | 4.7% | (2,303) | (4.4)% |
| SX-EW Buenavista | 146,348 | 145,734 | 137,440 | 614 | 0.4% | 8,294 | 6.0% |
| **Total Refined** | **1,273,420** | **1,213,639** | **1,255,223** | **59,781** | **4.9%** | **(41,584)** | **(3.3)%** |
| **Rod Mexico Open-pit - La Caridad** | **279,546** | **266,298** | **237,933** | **13,248** | **5.0%** | **28,365** | **11.9%** |
| **SILVER (thousand ounces)** |  |  |  |  |  |  |  |
| **Mined** |  |  |  |  |  |  |  |
| **Peru Open-pit** |  |  |  |  |  |  |  |
| Toquepala | 1,402 | 1,689 | 1,707 | (287) | (17.0)% | (18) | (1.1)% |
| Cuajone | 2,190 | 2,117 | 1,918 | 73 | 3.4% | 199 | 10.4% |
| **Mexico Open-pit** |  |  |  |  |  |  |  |
| La Caridad | 1,840 | 1,891 | 1,776 | (51.0) | (2.7)% | 115 | 6.5% |
| Buenavista | 1,910 | 1,972 | 1,464 | (62.0) | (3.1)% | 508 | 34.7% |
| **IMMSA unit** | 6,170 | 5,974 | 5,866 | 196 | 3.3% | 108 | 1.8% |
| **Total Mined** | **13,512** | **13,643** | **12,731** | **(131)** | **(1.0)%** | **912** | **7.2%** |

30

| Refined | Year Ended December 31, 2013 | 2012 | 2011 | Variance 2013-2012 Volume% |  | 2012-2011 Volume% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Peru Open-pit — Ilo | 3,221 | 2,881 | 3,152 | 340 | 11.8% | (271) | (8.6)% |
| Mexico Open-pit — La Caridad | 9,343 | 8,622 | 6,913 | 721 | 8.4% | 1,709 | 24.7% |
| IMMSA unit | 3,009 | 2,365 | 2,524 | 644 | 27.2% | (159) | (6.3)% |
| **Total Refined** | **15,573** | **13,868** | **12,589** | **1,705** | **12.3%** | **1,279** | **10.2%** |
| **MOLYBDENUM (thousand pounds)** |  |  |  |  |  |  |  |
| **Mined** |  |  |  |  |  |  |  |
| Toquepala | 10,278 | 9,850 | 11,823 | 428 | 4.3% | (1,973) | (16.7)% |
| Cuajone | 6,907 | 6,307 | 6,144 | 600 | 9.5% | 163 | 2.7% |
| Buenavista | 792 | — | — | 792 | — | — | — |
| La Caridad | 25,888 | 24,181 | 22,973 | 1,707 | 7.1% | 1,208 | 5.3% |
| **Total Mined** | **43,865** | **40,338** | **40,940** | **3,527** | **8.7%** | **(602)** | **(1.5)%** |
| **ZINC (thousand pounds)** |  |  |  |  |  |  |  |
| Mined IMMSA | 219,077 | 198,160 | 184,763 | 20,917 | 10.6% | 13,397 | 7.3% |
| Refined IMMSA | 215,374 | 206,225 | 200,332 | 9,149 | 4.4% | 5,893 | 2.9% |

31

SLOPE STABILITY:

Peruvian Operations

The Toquepala and Cuajone pits are approximately 825 meters and 900 meters deep, respectively. Under the present mine plan configuration the Toquepala pit will reach a depth of 1,635 meters and the Cuajone pit will reach a depth of 1,290 meters. The deepening pits present us with a number of geotechnical challenges. Perhaps the foremost concern is the possibility of slope failure, a possibility that all open-pit mines face. In order to maintain slope stability, in the past we have decreased pit slope angles, installed additional or duplicate haul road access, and increased stripping requirements. We have also responded to hydrological conditions and removed material displaced by slope failures. To meet the geotechnical challenges relating to slope stability of the open-pit mines, we have taken the following steps:

In the late 1990s we hosted round table meetings in Vancouver, B.C. with a group of recognized slope stability and open-pit mining specialists. The agenda for these meetings was principally a review of pit design for mines with greater than 700 meter depth. The discussions included practices for monitoring, data collection and blasting processes.

Based on the concepts defined at the Vancouver meetings, we initiated slope stability studies to define the mining of reserves by optimum design. These studies were performed by outside consultants and included slope stability appraisals, evaluation of the numerical modeling, slope performance and inter-ramp angle design and evaluation of hydrological conditions.

The studies were completed in 2000 and we believe we implemented the study recommendations. One of the major changes implemented was slope angle reduction at both mines, Toquepala by an average of five degrees and Cuajone by an average of seven degrees. Although this increased the waste included in the mineable reserve calculation, it also improved the stability of the pits.

In the Toquepala mine in 2007 we installed 20 meter wide geotechnical berms every 10 benches. We believe this will further strengthen the stability of the Toquepala pit.

Since 1998, a wall depressurization program has been in place in both pits. This consists of a horizontal drilling program, which improves drainage thereby reducing saturation and increasing wall stability. Additionally, a new blasting control program was put in place, implementing vibration monitoring and blasting designs of low punctual energy. Also a new slope monitoring system was implemented using reflection prisms, deformation inclinometers and piezometers for water level control, as well as real-time robotic monitoring equipment. In February 2012, a monitoring slope radar system was put in place at the Cuajone mine. In October 2012 two interferometric radars were put in place to monitor slope stability at the Toquepala mine, and in September 2013, new full monitoring software (FMS360) was installed These systems improve the reliability of instrumentation, the information quality for assessing the behavior of the slopes and anticipates the risks of instability.

In 2013, a program of oriented geotechnical drilling, totaling 20,000 meters, was executed at the Toquepala mine. This program, which began in May 2013, is part of the slope stability upgrade study and it is being executed by the team of mining consultants, including Itasca S.A., Stacey Mining Geotechnical Ltd. and Piteau Associates. During the execution of this program additional instrumentation has been implemented, including eight vibrating wire piezometers. The study report will include slope stability appraisals, evaluation of the numerical modeling, slope performance and inter-ramp angle design and evaluation of hydrogeological conditions. Additionally, in 2013, at the Toquepala mine, 366.15 meters of geotechnical drilling was carried out to install 3 inclinometers in the instability zone of the west ramp.

At the Cuajone mine, in 2007 in order to minimize the damage to the slopes caused by production blast vibrations, blasting control using three pre-split drills was implemented. Also, the slope monitoring system with reflection prisms has been replaced by a system using slope monitoring radar. In February 2012, the first radar equipment was put in service followed in August 2013 with the second radar installation and a geotechnical surveillance camera was added. This new system improves the reliability and continuity of monitoring, improves the quality of information used to evaluate the performance of the slopes and helps better anticipate the risk of instability. The sub-surface deformation and the water level are still monitored with inclinometers and piezometers. In September 2012, we completed a program of oriented geotechnical drilling, totaling 17,938 meters, and in May 2013 we completed a program of vertical geotechnical drilling, totaling 2,814 meters, with hydraulic tests performed on rock and subsequently instrumented with inclinometers/piezometers. The geotechnical and hydraulic information obtained from the two programs will be used in the development of a geotechnical study for the new 15 year mine development plan (2015-2029). Also during 2013 we drilled 772 meters of sub-horizontal holes in order to drain the east slope of the pit. The geotechnical study for the new 15 years mine development plan, is being prepared by SRK Consulting Chile and is expected to be completed in the second half of 2014, this study will contain recommendations for improving the stability of the pit slopes.

In 2013, the Board of Directors approved a project to improve slope stability at the south area of the Cuajone mine, which will remove approximately 148 million tons of waste material in order to improve the mine design without reducing our actual production level. For further information see Item 7. Management Discussion and Analysis — Capital Investment Program.

In 2013, a mining consulting group began a study of dump stability at the Toquepala mine. This study will include an assessment of the current stability of the dumps and will develop a geotechnical campaign to obtain information to assess the stability of the future and final stages of the dumps.

To increase the possibility of mining in the event of a slide, we have provided for two ramps of extraction for each open-pit mine. While these measures cannot guarantee that a slope failure will not occur, we believe that our mining practices are sound and that the steps taken and the ongoing reviews performed are a prudent methodology for open-pit mining.

Mexican operations

In 2004, our 15-year mine plan study for the La Caridad mine was awarded to an independent consulting firm to conduct a geotechnical evaluation. The purpose of the plan was to develop a program of optimum bench design and inter-ramp slope angles for the open-pit. A number of recommendations and observations were presented by the consultants. These included a recommendation of a maximum average bench face angle of 72 degrees. Additionally, single benching was recommended for the upper sections of the west, south and east walls of the main pit. Likewise, double benching was recommended for the lower levels of the main pit and single benching for the upper slope segments that consist of either alluvial material, mine waste dumps or mineralized stockpile material. Alternatively, slopes in these types of materials, may be designed with an overall 37 degree slope. The geostructural and geotechnical parameters recommended were applied in the pit design for the new life of the mine plan for La Caridad mine prepared in 2010. This mine plan replaced the 15-year mine plan prepared in 2004. However, since final pit limits have not been yet established at La Caridad, all current pit walls are effectively working slopes. Geostructural and geotechnical data collected at the open-pit mine from cell-mapping and oriented-core drilling databases provided the basis for the geotechnical evaluation and recommendations. We continue to collect new information related to geotechnical data and other geology features in order to ensure the structural security and also to improve the geotechnical data base for future studies

At the Buenavista mine, we are following the recommendations of a geotechnical evaluation of design slope for the 15-year pit plan. This evaluation was prepared by an independent mine consulting firm. This evaluation included the determination of optimum pit slope design angles and bench design parameters for the proposed mine plan. The objective of the study was: 1) to determine optimum inter-ramp slope angles and bench design parameters for the 15-year plan and 2) to identify and analyze any potential major instability that could adversely impact mine operation. In 2012, we installed a radar system to monitor the walls of the mine.

The following recommendations were made for the Buenavista mine: inter-ramp slope design angles for the 15-year pit plan, for all of the 21 design sectors, defined on a rock-fabric-based catch bench analysis, using double bench, can range from 48° and 55°, and the inter-ramp slope angles are based on geometries that resulted from the back-break analysis using 80% reliability of achieving the required 7.5 meter catch bench width for a single bench configuration and 10.6 meter catch bench width for a double bench configuration. Preliminary observations suggest the 15-year pit walls may be relative free-draining, the back-break analysis assumed depressurized conditions of mine benches, and the inter-ramp stability analysis were performed for both, saturated and depressurized conditions.

A pit dewatering/depressurization plan for the Buenavista mine was also recommended to address the issues of open-pit drainage, dewatering plan and future slope depressurization. Phase I of the geohydrological study was completed by an independent consultant. The analysis included a preliminary assessment and work plan implementations.

In 2011, five wells for extraction and monitoring were drilled close to the mine. Also, we began a drilling program to monitor possible water filtration beyond the limits of the open-pit mine. All the information obtained from these well drilling programs has been analyzed and included in the hydrologic model. The open-pit dewatering program from the bottom benches also continued during 2012 with a drilling program of 3,797 meters in several monitoring wells in order to allow us to continue with the current mining plan.

In 2013, Buenavista continued the executive drilling program of monitoring and extraction wells in the area of Increment (Phase) 5 of the mine and beyond the current limits of the open pit mine.

During 2013, the program to dewater the Buenavista pit bottom was continued in accordance with the short and medium term mine plans. Pumping from sumps located in Increment 5, permitted mining of high grade copper blocks. Concurrent with this operational task, a geophysical study was conducted to determine the best locations for water extraction wells to control the inflow of water to the pit bottom and thus allow us to continue our mining operations. The water extracted is being used for various purposes, including road irrigation for dust mitigation. The geophysical investigation also permitted the location of underground workings and the filtration and seepage through fractures.

A total of 7,339 meters were drilled during 2013 for 30 extraction wells, three of these wells are located in the area of Increment (Phase) 5. The rest were drilled at various locations outside of the current open pit mine limit.

Various studies are now being conducted by outside specialized consultants in order to establish long-range mine water management objectives and to implement recommendations for the efficient use of this resource.

METAL PRODUCTION BY SEGMENTS

Set forth below are descriptions of the operations and other information relating to the operations included in each of our three segments.

PERUVIAN OPERATIONS

Our Peruvian segment operations include the Cuajone and Toquepala mine complexes and the smelting and refining plants, industrial railroad which links Ilo, Toquepala and Cuajone and the port facilities.

Following is a map indicating the approximate location of, and access to, our Cuajone and Toquepala mine complexes, as well as our Ilo processing facilities:

#### Cuajone

Our Cuajone operations consist of an open-pit copper mine and a concentrator located in southern Peru, 30 kilometers from the city of Moquegua and 840 kilometers from Lima. Access to the Cuajone property is by plane from Lima to Tacna (1:40 hours) and then by highway to Moquegua and Cuajone (3:30 hours). The concentrator has a milling capacity of 87,000 tons per day. Overburden removal commenced in 1970 and ore production commenced in 1976. Our Cuajone operations utilize a conventional open-pit mining method to collect copper ore for further processing at the concentrator.

The table below sets forth 2013, 2012 and 2011 production information for our Cuajone operations:

|  |  | 2013 | 2012 | 2011 |
| --- | --- | ---: | ---: | ---: |
| Mine annual operating days |  | 365 | 366 | 365 |
| Mine |  |  |  |  |
| Total ore mined | (kt) | 29,269 | 28,708 | 29,073 |
| Copper grade | (%) | 0.669 | 0.653 | 0.578 |
| Leach material mined | (kt) | 3,071 | 554 | 3,096 |
| Leach material grade | (%) | 0.467 | 0.538 | 0.551 |
| Stripping ratio | (x) | 4.92 | 4.37 | 3.82 |
| Total material mined | (kt) | 173,277 | 154,091 | 140,108 |
| Concentrator |  |  |  |  |
| Total material milled | (kt) | 29,353 | 28,732 | 28,946 |
| Copper recovery | (%) | 85.91 | 84.57 | 83.69 |
| Copper concentrate | (kt) | 659.8 | 620.7 | 542.3 |
| Copper in concentrate | (kt) | 168.6 | 158.8 | 140.1 |
| Copper concentrates average grade | (%) | 25.55 | 25.58 | 25.84 |

| Molybdenum |  | 2013 | 2012 | 2011 |
| --- | --- | ---: | ---: | ---: |
| Molybdenum grade | (%) | 0.015 | 0.014 | 0.013 |
| Molybdenum recovery | (%) | 71.53 | 71.15 | 73.90 |
| Molybdenum concentrate | (kt) | 5.8 | 5.4 | 5.2 |
| Molybdenum concentrate average grade | (%) | 53.66 | 53.42 | 53.71 |
| Molybdenum in concentrate | (kt) | 3.1 | 2.9 | 2.8 |

Key: kt = thousand tons

x = Stripping ratio obtained dividing waste plus leachable material by ore mined.

Copper and molybdenum grades are referred to as total copper grade and total molybdenum grade, respectively.

We continuously improve and renovate our equipment. Major Cuajone mine equipment includes:

- Fifteen 290-ton capacity trucks,
- thirteen 218-ton capacity trucks,
- nine 231-ton capacity trucks,
- thirteen 360-ton capacity trucks,
- three 56-cubic yard capacity shovels,
- one 73-cubic yard shovel,
- one 60-cubic yard shovel,
- one 42-cubic yard shovel,
- one 33-cubic yard capacity front loader,
- one 50-cubic yard capacity front loader,
- six electric drills, and
- three diesel drills for pre-splitting.

Auxiliary equipment includes:

- Eight wheel bulldozers,
- eleven Caterpillar bulldozers,
- one 988 CAT front loaders,
- three 966 CAT front loaders,
- one 992 CAT front loader,
- five motorgraders, and
- four 785 CAT tanks.

#### Geology

The Cuajone porphyry copper deposit is located on the western slopes of Cordillera Occidental, in the southern-most Andes Mountains of Peru. The deposit is part of a mineral district that contains two additional known deposits, Toquepala and Quellaveco. The copper mineralization at Cuajone is typical of porphyry copper deposits.

The Cuajone deposit is located approximately 28 kilometers from the Toquepala deposit and is part of the Toquepala Group dated 60 to 100 million years (Upper Cretaceous to Lower Tertiary). The Cuajone lithology includes volcanic rocks from Cretaceous to Quaternary. There are 32 rock types including, pre-mineral rocks, basaltic andesite, porphyritic rhyolite, Toquepala dolerite and intrusive rocks, including diorite, porphyritic latite, breccias and dikes. In addition, the following post-mineral rocks are present, the Huaylillas formation which appears in the south-southeast side of the deposit and has been formed by conglomerates, tuffs, traquites and agglomerates. These formations date 17 to 23 million years and are found in the Toquepala Group as discordance. The Chuntacala formation which dates 9 to 14 million years and is formed by conglomerates, flows, tuffs and agglomerates placed gradually in some cases and in discordance in others. Also Quaternary deposits are found in the rivers, creeks and hills. The mineralogy is simple with regular grade distribution and vertically funnel-shaped. Ore minerals include chalcopyrite (CuFeS2), chalcosine (Cu2S) and molybdenite (MoS2) with occasional galena, tetraedrite and enargite as non economical ore.

#### Mine exploration

Exploration activities during the drill campaign in 2013 are as follows:

| Studies | Meters | Holes | Notes |
| --- | ---: | ---: | --- |
| Infill drilling | 2,350 | 13 | To obtain additional information to improve confidence in our block model. |
| Condemnatory holes | 1,796 | 3 | Areas for dumps. |
| Geotechnical holes | 3,502 | 56 | To improve geotechnical information |
| **Total** | 7,648 | 72 |  |

#### Concentrator

Our Cuajone operations use state-of-the-art computer monitoring systems at the concentrator, the crushing plant and the flotation circuit in order to coordinate inflows and optimize operations. Material with a copper grade over 0.35% is loaded onto rail cars and sent to the milling circuit, where giant rotating crushers reduce the size of the rocks to approximately one-half of an inch. The ore is then sent to the ball mills, which grind it to the consistency of fine powder. The finely ground powder is agitated in a water and reagents solution and is then transported to flotation cells. Air is pumped into the cells to produce foam for floating the copper and molybdenum minerals, but separating waste material called tailings. This copper-molybdenum bulk concentrate is then treated by inverse flotation where molybdenum is floated and copper is depressed. The copper concentrate is shipped by rail to the smelter at Ilo and the molybdenum concentrate is packaged for shipment to customers. Sulfides under 0.35% copper are considered waste.

Tailings are sent to thickeners where water is recovered. The remaining tailings are sent to the Quebrada Honda dam, our principal tailings storage facility.

Major Cuajone concentrator plant equipment includes:

- One primary crusher,
- three secondary crushers,
- seven tertiary crushers,
- one high pressure grinding roller,
- eleven primary ball mills,
- four ball mills for re-grinding rougher concentrate,
- one vertical mill for re-grinding rougher concentrate,
- thirty 100-cubic feet cells for rougher flotation,
- four 160-cubic feet cells for rougher flotation,
- five 60-cubic feet cells for cleaner scavenger,
- six 1,350-cubic feet cells for cleaner scavenger,
- fourteen 300-cubic feet cells for cleaner scavenger,
- eight column cells,
- one Larox filter press,
- one FLS Smith filter press,
- two thickeners for copper-molybdenum and copper concentrates,
- three tailings thickeners,
- one high-rate tailings thickener, and
- six pumps for recycling reclaimed water.

A major mill expansion was completed in 1999 and the eleventh primary mill was put in operation in January 2008. In December 2013, the high pressure roller crusher was put in operation. We believe the plant’s equipment is in good physical condition and suitable for our operations.

#### Toquepala

Our Toquepala operations consist of an open-pit copper mine and a concentrator. We also refine copper at the SX-EW facility through a leaching process. Toquepala is located in southern Peru, 30 kilometers from Cuajone and 870 kilometers from Lima. Access is by plane from Lima to the city of Tacna (1:40 hours) and then by the Pan-American highway to Camiara (1:20 hours) and by road to Toquepala (1 hour). The concentrator has a milling capacity of 60,000 tons per day. The SX-EW facility has a production capacity of 56,000 tons per year of LME grade A copper cathodes. Overburden removal commenced in 1957 and ore production commenced in 1960. Our Toquepala operations utilize a conventional open-pit mining method to collect copper ore for further processing in our concentrator.

The table below sets forth 2013, 2012 and 2011 production information for our Toquepala operations:

|  |  | 2013 | 2012 | 2011 |
| --- | --- | ---: | ---: | ---: |
| Mine annual operating days |  | 365 | 366 | 365 |
| Mine |  |  |  |  |
| Total ore mined | (kt) | 19,954 | 20,072 | 21,525 |
| Copper grade | (%) | 0.611 | 0.658 | 0.619 |
| Leach material mined | (kt) | 38,847 | 37,065 | 47,142 |
| Leach material grade | (%) | 0.222 | 0.247 | 0.253 |
| Stripping ratio | (x) | 7.51 | 7.67 | 7.24 |
| Total material mined | (kt) | 169,808 | 173,927 | 177,398 |
| Concentrator |  |  |  |  |
| Total material milled | (kt) | 19,925 | 20,090 | 21,497 |
| Copper recovery | (%) | 90.92 | 90.86 | 90.46 |
| Copper concentrate | (kt) | 409.6 | 451.5 | 455.2 |
| Copper in concentrate | (kt) | 110.7 | 120.1 | 120.4 |
| Copper concentrate average grade | (%) | 27.02 | 26.60 | 26.45 |
| Molybdenum |  |  |  |  |
| Molybdenum grade | (%) | 0.033 | 0.033 | 0.035 |
| Molybdenum recovery | (%) | 71.43 | 66.64 | 70.67 |
| Molybdenum concentrate | (kt) | 8.4 | 8.2 | 9.8 |
| Molybdenum concentrate average grade | (%) | 55.46 | 54.37 | 54.69 |
| Molybdenum in concentrate | (kt) | 4.7 | 4.5 | 5.4 |
| SX-EW plant |  |  |  |  |
| Estimated leach recovery | (%) | 25.69 | 25.56 | 25.33 |
| SX-EW cathode production | (kt) | 28.4 | 32.2 | 35.3 |

Key: kt = thousand tons

x = Stripping ratio obtained dividing waste plus leachable material by ore mined.

Copper and molybdenum grades are referred to as total copper grade and total molybdenum grade, respectively.

We continuously improve and renovate our equipment. Major mine equipment at Toquepala includes:

- Twenty-eight 290-ton capacity trucks,
- thirty-six 218-ton capacity trucks,
- eight 363-ton capacity trucks,
- one 60-cubic yard capacity shovel,
- three 56 cubic-yard capacity shovels,
- three 73-cubic yard capacity shovels,
- nine electric rotary drills,
- two Down the Hole (DTH) drills for pre-split, and
- three front-end loaders with capacities of 28, 23 and 33 cubic-yards.

#### Geology

The Toquepala porphyry copper deposit is located on the western slopes of Cordillera Occidental, in the southern-most Andes Mountains of Peru. The deposit is part of a mineral district that contains two additional known deposits, Cuajone and Quellaveco.

The Toquepala deposit is in the southern region of Peru, located on the western slope of the Andes mountain range, approximately 120 kilometers from the border with Chile. This region extends into Chile and is home to many of the world’s most significant known copper deposits. The deposit is in a territory with intrusive and eruptive activities of rhyolitic and andesitic rocks which are 70 million years old (Cretaceous-Tertiary) and which created a series of volcanic lava. The lava is composed of rhyolites, andesites and volcanic agglomerates with a western dip and at an altitude of 1,500 meters. These series are known as the Toquepala Group. Subsequently, different intrusive activities occurred which broke and smelted the rocks of the Toquepala Group. These intrusive activities resulted in diorites, granodiorites and dikes of porphyric dacite. Toquepala has a simple mineralogy with regular copper grade distribution. Economic ore is found as disseminated sulfurs throughout the deposit as veinlets, replenishing empty places or as small aggregates. Ore minerals include chalcopyrite (CuFeS2), chalcosine (Cu2S) and molybdenite (MoS2). A secondary enrichment zone is also found with thicknesses between 0 and 150 meters.

#### Mine Exploration

Exploration activities during the drill campaign in 2013 are as follows:

| Studies | Meters | Holes | Notes |
| --- | ---: | ---: | --- |
| Leach and ore confirmation for phase 4 and 5 | 3,800 | 8 | To confirm the lateral continuity of the ore body. |
| Study of slopes stability | 20,000 | 39 | Upgrade of the geotechnical studies of the pit. |
| Instability-west ramp | 366 | 3 | To define the potential depth of instability. |
| **Total** | **24,166** | **50** |  |

#### Concentrator

Our Toquepala concentrator operations use state-of-the-art computer monitoring systems in order to coordinate inflows and optimize operations. Material with a copper grade over 0.40% is loaded onto rail cars and sent to the crushing circuit, where rotating crushers reduce the size of the rocks by approximately 85%, to less than one-half of an inch. The ore is then sent to the rod and ball mills, which grind it in a mix with water to the consistency of fine powder. The finely ground powder mixed with water is then transported to flotation cells. Air is pumped into the cells producing a froth, which carries the copper mineral to the surface but not the waste rock, or tailings. The bulk concentrate with sufficient molybdenum content is processed to recover molybdenum by inverse flotation. This final copper concentrate with a content of approximately 26.5% of copper is filtered in order to reduce moisture to 8.5% or less. Concentrates are then shipped by rail to the Ilo smelter.

Tailings are sent to thickeners where water is recovered. The remaining tailings are sent to the Quebrada Honda dam, our principal tailings storage facility.

Major concentrator plant equipment at Toquepala includes:

- One primary crusher,
- three secondary crushers,
- six tertiary crushers,
- eight rod mills,
- twenty-four ball mills,
- one distributed control system,
- one expert grinding system,
- forty-two collective flotation cells,
- fifteen column cells,
- seventy-two Agitair 1.13 cubic meter cells,
- two Larox pressure filters,
- five middling thickeners,
- two conventional tailings thickeners,
- three high-rate tailings thickeners,
- one tripper car,
- one track tractor, and
- one recycled water pipe line.

The expected useful life of the principal equipment is over 20 years due to our equipment maintenance programs.

#### SX-EW Plant

The SX-EW facility at Toquepala produces grade A LME electrowon copper cathodes of 99.999% purity from solutions obtained by leaching low-grade ore stored at the Toquepala and Cuajone mines. The leach plant commenced operations in 1995 with a design capacity of 35,629 tons per year of copper cathodes. In 1999, the capacity was expanded to 56,000 tons per year.

Copper oxides from Cuajone with a copper grade higher than 0.208%, with an acid solubility index higher than 43% and a cyanide solubility index higher than 25% are leached. In Toquepala, the leach material cutoff grade is 0.132% and therefore material with a total copper grade between 0.132% and 0.40% are leached.

Major equipment at the Cuajone crusher plant includes:

- One primary jaw crusher, and
- one secondary cone crusher with a capacity of 390 tons per hour.

In addition, the Toquepala plant equipment includes:

- one agglomeration mill,
- one front end loader,
- one 445E Dresser truck of 120-ton capacity, and
- two 830E Komatsu trucks of 240-ton capacity for hauling to the leach dumps.

Copper in solution produced at Cuajone is sent to Toquepala through an eight-inch pipe laid alongside the Cuajone-Toquepala railroad track.

Major equipment at the Toquepala plant includes:

- Five pregnant solution (PLS) ponds, each with its own pumping system to send the solution to the SX-EW plant.
- Three lines of SX, each with a nominal capacity of 1,068 cubic meters per hour of pregnant solution and 162 electrowinning cells.

Plant and equipment are supported by a maintenance plan and a quality management system to assure good physical condition and high availability. The SX-EW plant management quality system (including leaching operations) has been audited periodically since 2002 by an external audit company, and found to be in compliance with the requirements of the ISO 9001-2008 standard. In 2012, we obtained the certification OHSAS 18001 of our occupational health and safety system and the ISO14001-2004 for our environmental standards at the SX-EW plant.

#### Processing Facilities - Ilo

Our Ilo smelter and refinery complex is located in the southern part of Peru, 17 kilometers north of the city of Ilo, 121 kilometers from Toquepala, 147 kilometers from Cuajone, and 1,240 kilometers from the city of Lima. Access is by plane from Lima to Tacna (1:40 hours) and then by highway to the city of Ilo (2:00 hours). Additionally, we maintain a port facility in Ilo, from which we ship our product and receive supplies. Product shipped and supplies received are moved between Toquepala, Cuajone and Ilo on our industrial railroad.

#### Smelter

Our Ilo smelter produces copper anodes for the refinery we operate as part of the same facility. Copper produced by the smelter exceeds the refinery’s capacity and the excess is sold to other refineries around the world. In 2007 we completed a major modernization of the smelter. The nominal installed capacity of the smelter is 1,200,000 tons of concentrate per year.

Copper concentrates from Toquepala and Cuajone are transported by railroad to the smelter, where they are smelted using an ISASMELT furnace, converters and anode furnaces to produce copper anodes with 99.7% copper. At the smelter, the concentrates are mixed with flux and other material and sent to the ISASMELT furnace producing a mixture of copper matte and slag which is tapped through a taphole to either of two rotary holding furnaces, where these smelted phases will be separated. Copper matte contains approximately 63% copper. Copper matte is then sent to the four Pierce Smith converters, where the material is oxidized in two steps: (1) the iron sulfides in the matte are oxidized with oxygen enriched air and silica is added producing slag that is sent to the slag cleaning furnaces, and (2) the copper contained in the matte sulfides is then oxidized to produce blister copper, containing approximately 99.3% copper. The blister copper is refined in two anode furnaces by oxidation to remove sulfur with compressed air injected into the bath. Finally, the oxygen content of the molten copper is adjusted by reduction with injection of liquefied petroleum gas with steam into the bath. Anodes, containing approximately 99.7% copper are cast in two casting wheels. The smelter also can produce blister copper bars, especially when an anode furnace is in general repair.

Major equipment at the Ilo smelter includes:

- one Isasmelt furnace,
- two rotary holding furnaces,
- four Pierce-Smith converters,
- two slag cleaning furnaces,
- two anodes furnaces,
- one casting twin-wheel,
- one blister holding furnace,
- one casting blister wheel,
- one waste heat boiler,
- one superheated steam, and
- three electrostatic precipitators.

The table below sets forth 2013, 2012 and 2011 production and sales information for our Ilo smelter plant:

| Smelter |  | 2013 | 2012 | 2011 |
| --- | --- | ---: | ---: | ---: |
| Concentrate smelted | (kt) | 1,072.8 | 996.6 | 1,094.2 |
| Average copper recovery | (%) | 97.9 | 97.7 | 97.6 |
| Blister production | kt | 1.7 | 33.1 | — |
| Average blister grade | (%) | 99.35 | 99.34 | — |
| Anode production | (kt) | 323.5 | 265.9 | 338.7 |
| Average anode grade | (%) | 99.75 | 99.73 | 99.74 |
| Sulfuric acid produced | (kt) | 1,025.8 | 968.7 | 1,061.6 |
| Sales data: |  |  |  |  |
| Blister sales | (kt) | 1.67 | 32.84 | — |
| Anode sales | (kt) | 1.00 | 2.51 | 10.4 |
| Average blister sales price | ($/lb) | 3.98 | 3.48 | — |
| Average anode sales price | ($/lb) | 3.26 | 3.93 | 3.64 |
| Average sulfuric acid price | ($/ton) | 94.89 | 133.98 | 98.40 |

Key: kt = thousand tons

The off gases from the smelter are treated to recover over 92% of the incoming sulfur received in the concentrates producing 98.5% sulfuric acid. The gas stream from the smelter with 11.34% SO2 is split between two plants: The No. 1 acid plant (single absorption/single contact) and the No. 2 plant (double absorption/double contact). Approximately, 16% of the acid produced is used at our facilities with the balance sold to third parties. We anticipate that our internal usage will be over 80% when the Tia Maria project begins operation.

The smelter also has two oxygen plants. Plant No. 1, with 272 tons per day of production capacity and Plant No.2, with 1,045 tons per day of capacity.

In addition, the smelter includes:

- one seawater intake system,
- two desalinization plants to provide water for the process,
- one electric substation, and
- one centralized control using advanced computer technology.

In 2010, the Ilo smelter marine trestle started operation. This facility allows us to offload directly to offshore ships the sulfuric acid produced, avoiding hauling cargo through the city of Ilo. The 500 meter long marine trestle is the last part of the Ilo smelter modernization project. Currently all overseas shipments of sulfuric acid are being made using the marine trestle.

#### Refinery

The Ilo refinery consists of an electrolytic plant, a precious metal plant and a number of ancillary installations. The refinery is producing grade A copper cathode of 99.998% purity. The nominal capacity is 280,000 tons per year. Anodic slimes are recovered from the refining process and then sent to the precious metals facility to produce refined silver, refined gold and commercial grade selenium.

Anodes are suspended in tanks containing an aqueous solution of sulfuric acid and copper sulfate. A low voltage but high amperage electrical current is passed through the anodes, chemical solution and cathodes, in order to dissolve copper which is deposited on initially very thin starting sheets increasing its thickness to produce high grade copper cathodes. During this process, silver, gold and other metals, including palladium, platinum and selenium, along with other impurities, settle on the bottom of the tank in the form of anodic slime. This anodic slime is processed in a precious metal plant where silver, gold and selenium are recovered.

The table below sets forth 2013, 2012 and 2011 production and sales information for our Ilo refinery and precious metals plants:

| Refinery |  | 2013 | 2012 | 2011 |
| --- | --- | ---: | ---: | ---: |
| Cathodes produced | (kt) | 271.0 | 215.7 | 261.0 |
| Average copper grade | (%) | 99.971 | 99.998 | 99.998 |
| Refined silver produced | (000 Kg) | 100.2 | 89.6 | 98.1 |
| Refined gold produced | (kg) | 238.3 | 184.2 | 363.1 |
| Commercial grade selenium produced | (tons) | 51.5 | 41.5 | 53.7 |
| Sales data: |  |  |  |  |
| Average cathodes sales price | ($/lb) | 3.37 | 3.67 | 3.92 |
| Average silver sales price | ($/oz) | 24.26 | 30.76 | 35.10 |
| Average gold sales price | ($/oz) | 1,392.49 | 1,663.91 | 1,579.97 |

Key: kt = thousand tons

Major equipment at the refinery includes:

- one electrolytic plant, with 926 commercial cells,
- fifty-two starting sheet cells,
- sixteen primary liberator cells,
- twenty-four secondary liberator cells,
- one anodic slime treatment circuit (includes leaching and centrifugation), and
- one electrolytic bleeding-off system by railroad to Toquepala’s leaching plants.

Main equipment at the precious metals plant includes:

- one Wenmec selenium reactor and system to produce commercial grade selenium powder,
- one tilting Copella furnace,
- twenty-six silver electrorefining cells including an induction furnace for shots and silver ingots production, and
- one hydrometallurgical system for gold recovery.

The refinery also has these facilities:

(1) Production control: Provides sampling and sampling preparation for samples coming from the operating units, as well as SX-EW, smelter and external services.

(2) Laboratory: Provides sample analysis services throughout the Company, including the analysis of final products like copper cathodes, electrowon cathodes, copper concentrates and oil analysis.

(3) Maintenance: Responsible for maintenance of all equipment involved in the process.

(4) Auxiliary facilities: Includes one desalinization plant to produce 1,000 cubic meters per day fresh water and a Gonella boiler to produce saturated steam used in the refinery and two KMH boilers used as back up.

Other facilities in Ilo are a coquina plant with a production capacity of 200,000 tons per year of seashells and a lime plant with a capacity of 80,000 tons per year. We also operate an industrial railroad to haul production and supplies between Toquepala, Cuajone and Ilo.

The industrial railroad’s main equipment includes fifteen locomotives of different types including 4000HP EMD’s SD70, 3000HP EMD’s GP40-3, 2250HP GE U23B and others. The rolling stock has approximately 496 cars of different types and capacities, including ore concentrate cars, gondolas, flat cars, dump cars, boxcars, tank cars and others. The track runs in a single 214 kilometer standard gauge line and supports a 30-ton axle load. The total length of the track system is around 257 kilometers including main yards and sidings.

The infrastructure includes 27 kilometers of track under tunnels and one concrete bridge. The industrial railroad includes a car repair shop which is responsible for maintenance and repair of the car fleet. Annual tonnage transported is approximately 5.1 million tons.

MEXICAN OPERATIONS

Following is a map indicating the approximate locations of our Mexican mines and processing facilities:

MEXICAN OPEN-PIT SEGMENT

Our Mexican open-pit segment operations combines two units of Minera Mexico, La Caridad and Buenavista, which includes La Caridad and Buenavista mine complexes and smelting and refining plants and support facilities, which service both complexes.

Following is a map indicating the approximate location of, and access to, our Mexican open-pit mine complexes, as well as our processing facilities:

#### Buenavista

The Buenavista mining unit operates an open-pit copper mine, a concentrator and two SX-EW plants. It is located 100 air-kilometers northwest of La Caridad and 40 kilometers south of the Arizona U.S. Mexican border. It lies on the outskirts of the city of Cananea. Buenavista is connected by paved highways to the border city of Agua Prieta to the northeast, to the town of Nacozari in the southeast, and to the town of Imuris to the west. Buenavista is also connected by railway to Agua Prieta and Nogales. A municipal airport is located approximately 20 kilometers to the northeast of Buenavista.

Except for very brief periods, Buenavista was on strike from July 2007 through June 2010. Restoration of mine and plants started in the third quarter of 2010 and was completed in 2011. SX-EW production was restored to full capacity by the fourth quarter of 2010 and concentrator production reached full capacity in the second quarter of 2011. In 2013, mine operations were affected by flooding problems caused by unusual rains in the area, as a consequence we lost approximately 22,900 tons of copper production. The mine restored full operations by the end of the third quarter of 2013.

We have started a major capital investment program at Buenavista, which includes a new SX-EW plant with a planned annual capacity of 120,000 tons of copper, a concentrator expansion with an increase in production capacity of 188,000 tons per year and two molybdenum plants with a combined annual capacity of 4,600 tons. This investment program is underway and we expect to complete it in two phases. We expect to complete the first phase in 2014 and estimate an increase in annual production of 120,000 tons and to complete the second phase in 2015 with an expected further increase in annual copper production of 188,000 tons. With these investments, we expect the total production capacity at Buenavista will reach 488,000 tons of copper by 2015.

The concentrator has a nominal milling capacity of 76,700 tons per day. The SX-EW facility has a cathode production capacity of 54,750 tons per year. The Buenavista ore body is considered one of the world’s largest porphyry copper deposits. Buenavista is the oldest continuously operated copper mine in North America, with operations dating back to 1899. High grade ore deposits in the district were mined exclusively using underground methods. The Anaconda Company acquired the property in 1917. In the early 1940s Anaconda started developing the first open-pit in Buenavista. In 1990, through a public auction procedure, Minera Mexico acquired 100% of the Buenavista mining assets for $475 million. Buenavista is currently applying conventional open-pit mining methods to extract copper ore for further processing in the concentrator. Two leach ore crushers and the corresponding belt conveying systems are used to convey the leachable material to the heaps. Likewise, run-off mine leachable ore is hauled by trucks to the leach dumps.

The following table shows 2013, 2012 and 2011 production information for Buenavista:

|  |  | 2013 | 2012 | 2011 |
| --- | --- | ---: | ---: | ---: |
| Mine annual operating days |  | 365 | 366 | 365 |
| Mine: |  |  |  |  |
| Total ore mined | (kt) | 25,260 | 25,763 | 22,444 |
| Copper grade | (%) | 0.559 | 0.632 | 0.623 |
| Leach material mined (\*) | (kt) | 131,559 | 66,241 | 47,399 |
| Leach material grade | (%) | 0.238 | 0.275 | 0.299 |
| Stripping ratio | (x) | 7.18 | 4.86 | 3.38 |
| Total material mined | (kt) | 206,710 | 150,871 | 98,306 |
| Concentrator: |  |  |  |  |
| Total material milled | (kt) | 25,277 | 25,748 | 21,972 |
| Copper recovery | (%) | 81.93 | 82.30 | 80.44 |
| Copper concentrate | (kt) | 476.5 | 511.6 | 410.0 |
| Copper in concentrate | (kt) | 115.8 | 134.0 | 110.1 |
| Copper concentrate average grade | (%) | 24.31 | 26.18 | 26.86 |
| SX-EW plant |  |  |  |  |
| Estimated leach recovery | (%) | 50.11 | 53.29 | 53.39 |
| SX-EW cathode production | (kt) | 66.4 | 66.1 | 62.3 |

Key: kt = thousand tons

x = Stripping ratio obtained dividing waste plus leachable material by ore mined.

The copper grade is total grade.

(\*) The 2013 increase in leach material mined was due to the additional material mined for the new SX-EW III plant that is expected to start operations in the second quarter of 2014.

Major Buenavista mine equipment includes:

- Fifty six 400-ton-capacity trucks,
- thirteen 320-ton-capacity trucks,
- twenty 240-ton-capacity trucks,
- three 52,000 gallon-capacity tanker trucks,
- four 40,000- gallon-capacity tanker trucks,
- four 40-cubic-yard-capacity shovels,
- one 56-cubic-yard-capacity shovel,
- two 70-cubic-yard-capacity shovels, and
- seven 74-cubic-yard-capacity shovels.

Mine auxiliary equipment including:

- Eleven drillers,
- three front loaders,
- five motor graders, and
- twenty-nine tractors.

#### Geology

The Buenavista mining district lies on the southern cordilleran orogen, which extends from southern Mexico to northwestern United States. It also falls within the Basin and Range metallogenic province. Geological and structural features in the district are representative of large, disseminated type, porphyry copper deposits. A calcareous sedimentary sequence of lower Paleozoic age, lithologically correlated with a similar section in southeastern Arizona, uncomformably overlies Precambrian granite basement. The entire section was covered by volcanic rocks of Mesozoic age and later intruded by deep seated granodiorite batholith of Tertiary age, with further quartz monzonite porphyry differentiates of Laramide age.

Mineralization in the district is extensive covering a surface area of approximately 30 square kilometers. An early pegmatitic stage associated with bornite-chalcopyrite-molybdenite assemblage was followed by a widespread flooding of hydrothermal solutions with quartz- pyrite-chalcopyrite. A pervasive quartz-sericite alteration is evident throughout the district’s igneous rock fabric.

An extensive and economically important zone of supergene enrichment, with disseminated and stockworks of chalcocite (Cu2S), developed below the iron oxide capping. This zone coincides with the topography and has an average thickness of 300 meters. A mixed zone of secondary and primary sulfides underlay the chalcocite blanket. The hypogene mineralization, principally chalcopyrite, (CuFeS2), extensively underlies the ore body. Molybdenite occurs throughout the deposit and the content tends to increase with depth.

The Buenavista copper porphyry is considered world-class and unique. The deepest exploration results in the core of the deposit have confirmed significant increase in copper grades. Similar porphyry copper deposits usually contain lower grades at depth. The district is also unique for the occurrence of high-grade breccia pipes, occurring in clusters following the trend of the district.

Current dimensions of the mineralized ore body are 5x3 kilometers, and projects to more than 1 kilometer at depth. Considering the geological and economic potential of the Buenavista porphyry copper deposit, it is expected that the operation can support a sizeable increase in copper production capacity.

#### Mine Exploration

In-fill core drilling was conducted at the Buenavista zinc-copper-silver deposit, including directional drilling for geotechnical purposes. A deep drilling campaign was initiated in 2011 to explore the extent of the deposit at depth, drilling a total of 3,860 meters in 2012. For short-term mine planning, 6,652 meters were drilled to confirm copper grade and metallurgical recoveries. Also, in 2011, a condemnation drilling program was initiated to define areas for future infrastructure, as well as areas where leach and waste dumps will be deposited. A total of 28,369 meters of core drilling were completed in 2011. A geohydrology program was initiated in 2011 to explore the possibility of groundwater sources within the mine limits, and a total of 29,750 meters of diamond drilling were drilled in 2012. In addition, 3,797 meters were drilled for water monitoring wells. We did not have a drilling campaign in 2013. For 2014, 20,000 meters of drilling are planned to define reserves and to confirm copper and molybdenum grades.

#### Concentrator

Buenavista uses state-of-the-art computer monitoring systems at the concentrator, the crushing plant and the flotation circuit in order to coordinate inflows and optimize operations. Material with a copper grade over 0.38% is loaded onto trucks and sent to the milling circuit, where giant rotating crushers reduce the size of the ore to approximately one-half of an inch. The ore is then sent to the ball and bar mills, which grind it to the consistency of fine powder. The finely ground powder is agitated in a water and reagents solution and is then transported to flotation cells. Air is pumped into the cells producing a froth, which carries the copper mineral to the surface but not the waste rock, or tailings. Recovered copper, with the consistency of froth, is filtered and dried to produce copper concentrates with an average copper content of approximately 27%. Concentrates are then shipped by rail to the smelter at La Caridad.

The Buenavista concentrator plant, with a milling capacity of 76,700 tons per day, consists of:

- Two primary crushers,
- four secondary crushers,
- ten tertiary crushers,
- ten primary mills,
- one expert control system,
- five mills for re-grinding,
- 103 primary flotation cells,
- ten column cells,
- seventy scavenger flotation cells,
- seven thickeners, and
- three ceramic filters.

In addition, the facility has:

- Forty eight wells and two pumping stations for fresh water supply,
- one tailings dam, and
- one reclaimed water pumping station.

As part of the expansion program for this unit, in 2013 we completed the construction of the first molybdenum plant with an annual production capacity of 2,000 tons of molybdenum contained in concentrate. The plant was designed to process 1,500 tons of copper-molybdenum concentrates per day with a recovery of 85% and 50% of molybdenum content. The molybdenum plant consists of thickeners, homogenizer tanks, flotation cells, column cells and a holo-flite dryer.

#### SX-EW Plant

The Buenavista unit operates a leaching facility and two SX-EW plants. All copper ore with a grade lower than the mill cut-off grade of 0.38%, but higher than 0.25%, is delivered to the leach dumps. A cycle of leaching and resting occurs for approximately five years in the run-of-mine dumps and three years for the crushed leach material.

The Buenavista unit currently maintains 18.1 million cubic meters of pregnant leach solution in inventory with a concentration of approximately 1.82 grams of copper per liter.

Major equipment at the SX-EW I and II plants includes: two crushing systems (No.1 and No.2). Crushing system No. 1 has a capacity of 32,000 tons per day and includes:

- One apron feeder,
- one conveyor belt feeder,
- eight conveyor belt systems, and
- one distributing bar.

Crushing system No. 2 has a capacity of 48,000 tons per day and includes:

- One crusher,
- one conveyor belt feeder,
- four conveyor belts, and
- one distributing bar.

There are three irrigation systems for the dumps and eleven dams for the pregnant leach solution (PLS). Plant I has four solvent extraction tanks with a nominal capacity of 16,000 liters per minute of PLS and 52 electrowinning cells and has a daily production capacity of 30 tons of copper cathodes with 99.999% purity. Plant II has five trains of solvent extraction with a nominal capacity of 55,000 liters per minute of PLS and 216 cells distributed in two bays and has a daily production capacity of 120 tons of copper cathodes with 99.9% purity.

In 2014, we expect to increase the Buenavista unit’s production of copper cathodes with a new SX-EW plant, (SX-EW III) with an annual capacity of 120,000 tons. The plant would produce copper cathodes of ASTM grade 1 or LME grade A. Please see “Capital Investment Program” under Item 7 for further information.

#### La Caridad

The La Caridad complex includes an open-pit mine, concentrator, smelter, copper refinery, precious metals refinery, rod plant, SX-EW plant, lime plant and two sulfuric acid plants.

La Caridad mine and mill are located about 23 kilometers southeast of the town of Nacozari in northeastern Sonora. Nacozari is about 264 kilometers northeast of the Sonora state capital of Hermosillo and 121 kilometers south of the U.S.-Mexico border. Nacozari is connected by paved highway with Hermosillo and Agua Prieta and by rail with the international port of Guaymas, and the Mexican and United States rail systems. An airstrip with a reported runway length of 2,500 meters is located 36 kilometers north of Nacozari, less than one kilometer away from the La Caridad copper smelter and refinery. The smelter and the sulfuric acid plants, as well as the refineries and rod plant, are located approximately 24 kilometers from the mine. Access is by paved highway and by railroad.

The concentrator began operations in 1979, the molybdenum plant was added in 1982, the smelter in 1986, the first sulfuric acid plant in 1988, the SX-EW plant in 1995, the second sulfuric acid plant in 1997, the copper refinery in 1997, the rod plant in 1998, the precious metals refinery in 1999, and the dust and effluents plant in 2012.

The table below sets forth 2013, 2012 and 2011 production information for La Caridad:

|  |  | 2013 | 2012 | 2011 |
| --- | --- | ---: | ---: | ---: |
| Mine annual operating days |  | 365 | 366 | 365 |
| Mine |  |  |  |  |
| Total ore mined | (kt) | 33,570 | 33,556 | 33,185 |
| Copper grade | (%) | 0.344 | 0.344 | 0.329 |
| Leach material mined | (kt) | 30,426 | 34,848 | 32,333 |
| Leach material grade | (%) | 0.225 | 0.224 | 0.235 |
| Stripping ratio | (x) | 1.64 | 1.58 | 1.54 |
| Total material mined | (kt) | 88,595 | 86,632 | 84,266 |
| Concentrator |  |  |  |  |
| Total material milled | (kt) | 33,629 | 33,434 | 33,201 |
| Copper recovery | (%) | 83.76 | 85.06 | 82.19 |
| Copper concentrate | (kt) | 459.6 | 461.5 | 458.8 |
| Copper in concentrate | (kt) | 96.9 | 97.8 | 89.8 |
| Copper concentrate average grade | (%) | 21.08 | 21.20 | 19.57 |
| Molybdenum |  |  |  |  |
| Molybdenum grade | (%) | 0.044 | 0.043 | 0.046 |
| Molybdenum recovery | (%) | 79.81 | 76.44 | 68.81 |
| Molybdenum concentrate | (kt) | 21.8 | 20.3 | 19.5 |
| Molybdenum concentrate average grade | (%) | 53.96 | 54.09 | 53.49 |
| Molybdenum in concentrate | (kt) | 11.7 | 11.0 | 10.4 |
| SX-EW plant |  |  |  |  |
| Estimated leach recovery | (%) | 38.79 | 39.20 | 39.99 |
| SX-EW cathode production | (kt) | 23.9 | 22.8 | 23.9 |

|  |  |
| --- | --- |
| Key: | kt = thousand tons |
|  | x = Stripping ratio obtained dividing waste plus leachable material by ore mined |
|  | The copper and molybdenum grade are total grade. |

Major mine equipment includes:

- Twenty-three 240 ton-capacity trucks,
- four 360 ton-capacity trucks, and,
- six 43 cubic-yard-capacity shovels.

Loading and auxiliary equipment includes:

- Six drillers,
- five front loaders,
- three motorgraders, and
- nineteen tractors.

#### Geology

The La Caridad deposit is a typical porphyry copper and molybdenum deposit as seen also in the southwestern basin of United States. The La Caridad mine uses a conventional open-pit mining method. The ore body is at the top of a mountain, which gives La Caridad the advantage of a relative low waste-stripping ratio, natural pit drainage and relative short haul for both ore and waste. The mining method involves drilling, blasting, loading and haulage of ore mill and waste to the primary crushers and the leach materials and waste to dumps, respectively.

La Caridad deposit is located in northeastern Sonora, Mexico. The deposit is situated near the crest of the Sierra Juriquipa, about 23 kilometers southeast of the town of Nacozari, Sonora, Mexico. The Sierra Juriquipa rises to elevations of around 2,000 meters in the vicinity of La Caridad and is one of the many north-trending mountain ranges in Sonora that form a southern extension of the basin and range province.

The La Caridad porphyry copper-molybdenum deposit occurs exclusively in felsic to intermediate intrusive igneous rocks and associated breccias. Host rocks include diorite and granodiorite. These rocks are intruded by a quartz monzonite porphyry stock and by numerous breccia masses, which contain fragments of all the older rock types.

Supergene enrichment, consisting of completes to partial chalcosite (Cu2S) replacement of chalcopyrite (CuFeS2). The zone of supergene enrichment occurs as a flat and tabular blanket with an average diameter of 1,700 meters and thickness generally between 0 and 90 meters.

Economic ore is found as disseminated sulfurs within the central part of the deposit. Sulfide-filled breccia cavities are most abundant in the intrusive breccia. This breccia-cavity mineralization occurs as sulfide aggregates which have crystallized in the spaces separating breccia clasts. Near the margins of the deposit, mineralization occurs almost exclusively in veinlets. Ore minerals include chalcopyrite (CuFeS2), chalcosite (Cu2S) and molybdenite (MoS2).

#### Mine Exploration

The La Caridad ore body has been mined for over 30 years. The extent of the model area is approximately 6,000 meters by 4,000 meters with elevation ranging from 750 to 1,800 meters. Sixteen drilling campaigns have been conducted on the property since 1968. These campaigns drilled a total of 3,317 drill holes: 1,154 were diamond drill holes and 2,163 were reverse circulation. We have also drilled some hammer and percussion drill holes. A total of 634,080 meters have been drilled through December 2011.

In 2008, La Caridad finished a large exploration program of 50,000 meters. The target was to reach to the 900 level in order to reduce the drilling space and to define the copper and molybdenum mineralization continuity and also carry out metallurgical testing for the flotation and leaching processes. There was no exploration program between 2009 and 2011. In 2012, we drilled 10,000 meters and further defined the extent of the copper and molybdenum mineralization. There was no exploration program in 2013. For 2014, we plan a 5,000 meter drilling program to define a high grade ore body located in the south western edge of the pit.

#### Concentrator

La Caridad uses state-of-the-art computer monitoring systems at the concentrator, the crushing plant and the flotation circuit in order to coordinate inflows and optimize operations. The concentrator has a current capacity of 91,000 tons of ore per day.

Ore extracted from the mine with a copper grade over 0.30% is sent to the concentrator and is processed into copper concentrates and molybdenum concentrates. The copper concentrates are sent to the smelter and the molybdenum concentrate is sold to a Mexican customer. The molybdenum recovery plant has a capacity of 2,000 tons per day of copper-molybdenum concentrates. The lime plant has a capacity of 340 tons of finished product per day.

La Caridad concentrator plant equipment includes:

- Two primary crushers,
- six secondary crushers,
- twelve tertiary crushers,
- twelve ball mills,
- one master milling control system,
- 140 primary flotation cells,
- four re-grinding mills,
- ninety-six cleaning flotation cells,
- twelve thickeners, and
- eight drum filters.

#### SX-EW Plant

Approximately 693.7 million tons of leaching ore with an average grade of approximately 0.246% copper have been extracted from the La Caridad open-pit mine and deposited in leaching dumps from May 1995 to December 31, 2013. All copper ore with a grade lower than the mill cut-off grade 0.30%, but higher than 0.15% copper, is delivered to the leaching dumps. In 1995, we completed the construction of a SX-EW facility at La Caridad that has allowed processing of this ore and certain leach ore reserves that were not mined and has resulted in a reduction in our copper production costs. The SX-EW facility has an annual capacity of 21,900 tons of copper cathodes.

The La Caridad SX-EW plant has:

- Nine irrigation systems for the dumps,
- two PLS dams, and
- one container of heads that permits the combination of the solutions of both dams and which feeds the SX-EW plant with a more homogenous concentration.

The plant has three trains of solvent extraction with a nominal capacity of 2,400 cubic meters per hour and 94 electrowinning cells distributed in one single electrolytic bay. The plant has a daily production capacity of 62 tons of copper cathodes with 99.999% purity.

#### Processing Facilities — La Caridad

Our La Caridad complex includes a smelter, an electrolytic copper refinery, a precious metal refinery and a copper rod plant. The distance between this complex and the La Caridad mine is approximately 24 kilometers.

#### Smelter

Copper concentrates from Buenavista, Santa Barbara, Charcas and La Caridad are transported by rail and truck to the La Caridad smelter where they are processed and cast into copper anodes of 99.2% purity. Sulfur dioxide off-gases collected from the flash furnace, the El Teniente converter and conventional converters are processed into sulfuric acid, at two sulfuric acid plants. Approximately 2% to 3% of this acid is used by our SX-EW plants and the balance is sold to third parties.

Almost all of the anodes produced in the smelter are sent to the La Caridad copper refinery. The actual installed capacity of the smelter is 1,000,000 tons per year, a capacity that is sufficient to treat all the concentrates of La Caridad and Buenavista, and starting in 2010, the concentrates from the IMMSA mines, as we closed the San Luis Potosi smelter.

Major equipment at the smelter includes:

- One flash type concentrates drier,
- one steam drier,
- one flash furnace,
- one El Teniente modified converter furnace,
- two electric slag-cleaning furnaces,
- three Pierce-Smith converters,
- three raffinate furnaces, and
- two casting wheels.

The anode production capacity is 300,000 tons per year.

#### Refinery

La Caridad includes an electrolytic copper refinery that uses permanent cathode technology. The installed capacity of the refinery is 300,000 tons per year. The refinery consists of an anode plant with a preparation area, an electrolytic plant with an electrolytic cell house with 1,115 cells and 32 liberator cells, two cathode stripping machines, an anode washing machine, a slime treatment plant and a number of ancillary installations. The refinery is producing grade A copper cathode of 99.99% purity. Anodic slimes are recovered from the refining process and sent to the slimes treatment plant where additional copper is extracted. The slimes are then filtered, packed and shipped to the La Caridad precious metals refinery to produce silver and gold.

The operations of the precious metal refinery begin with the reception of slime from silver concentrates, which are dried in a steam dryer. After this, the dried slime is smelted and a gold and silver alloy is obtained, which is known as Dore. The precious metal refinery plant has a hydrometallurgical stage and a pyrometallurgical stage, besides a steam dryer, Dore casting system, Kaldo furnace, 20 electrolytic cells in the silver refinery, one induction furnace for fine silver, one silver ingot casting system and two reactors for obtaining fine gold. The process ends with the refining of the gold and silver alloy. We also recover commercial selenium from the gas produced by the Kaldo furnace process.

#### Copper Rod Plant

A rod plant at the La Caridad complex was completed in 1998 and reached its full annual operating capacity of 150,000 tons in 1999. The plant is producing eight millimeter copper rods with a purity of 99.99%. The rod plant equipment includes:

- One vertical furnace,
- one retention furnace,
- one molding machine,
- one laminating machine,
- one coiling machine, and
- one coil compacter.

Other facilities include:

- One lime plant with a capacity of 132,000 tons per year,
- one sulfuric acid plant with a capacity of 2,625 tons per day,
- one sulfuric acid plant with a capacity of 2,135 tons per day,
- three oxygen plants, each with a production capacity of 275 tons per day,
- one power turbo generator with a 11.5 megawatt capacity, and
- one power turbo generator with a 25 megawatt capacity.

One of the turbo generators uses residual heat from the flash furnace.

In 2012, we started operating a dust and effluent plant with a treatment capacity of 3,100 tons per year which will produce 720 tons of copper by-products and 11,000 tons of lead per year. This plant is designed to reduce dust emissions from La Caridad metallurgical complex.

The table below sets forth 2013, 2012 and 2011 production information for the La Caridad processing facilities:

| Smelter |  | 2013 | 2012 | 2011 |
| --- | --- | ---: | ---: | ---: |
| Total copper concentrate smelted | (kt) | 722.6 | 904.3 | 832.3 |
| Anode copper production | (kt) | 222.1 | 263.0 | 233.8 |
| Average copper content in anode | (%) | 99.42 | 99.22 | 99.09 |
| Average smelter recovery | (%) | 98.8 | 97.4 | 97.0 |
| Sulfuric acid production | (kt) | 719.5 | 887.8 | 819.0 |
| Refinery |  |  |  |  |
| Refined cathode production | (kt) | 188.0 | 213.7 | 186.9 |
| Refined silver production | (000 kg) | 290.6 | 268.2 | 215.0 |
| Refined gold production | (Kg) | 1,269.0 | 1,426.7 | 996.1 |
| Rod Plant |  |  |  |  |
| Copper rod production | (kt) | 126.8 | 120.8 | 107.9 |
| Sales data: |  |  |  |  |
| Average realized price copper rod | ($ per lb) | 3.45 | 3.72 | 3.98 |
| Average premium copper rod | ($ per lb) | 0.11 | 0.12 | 0.11 |
| Average realized price gold | ($ per ounce) | 1,430.85 | 1,666.66 | 1,584.71 |
| Average realized price silver | ($ per ounce) | 23.93 | 31.17 | 34.94 |
| Average realized price sulfuric acid | ($ per ton) | 79.55 | 105.40 | 90.60 |

Key: kt = thousand tons

Kg = kilograms

MEXICAN IMMSA UNIT

Our IMMSA unit (underground mining poly-metallic division) operates five underground mining complexes situated in central and northern Mexico and produces zinc, lead, copper, silver and gold, and has a coal mine. These complexes include industrial processing facilities for zinc, lead, copper and silver. All of IMMSA’s mining facilities employ exploitation systems and conventional equipment. We believe that all the plants and equipment are in satisfactory operating condition. IMMSA’s principal mining facilities include Charcas, Santa Barbara, San Martin, Santa Eulalia and Taxco.

The table below sets forth 2013, 2012 and 2011 production information for our Mexican IMMSA unit:

|  |  | 2013 | 2012 | 2011 |
| --- | --- | ---: | ---: | ---: |
| Average annual operating days(\*) |  | 307 | 299 | 318 |
| Total material mined and milled | (kt) | 3,066 | 2,907 | 2,831 |
| Zinc average ore grade | (%) | 3.58 | 3.49 | 3.59 |
| Zinc concentrate produced | (kt) | 185.3 | 167.0 | 151.5 |
| Zinc concentrate average grade | (%) | 53.64 | 53.84 | 55.32 |
| Zinc average recovery | (%) | 90.62 | 88.48 | 82.55 |
| Lead average ore grade | (%) | 0.96 | 0.86 | 0.88 |
| Lead concentrate produced | (kt) | 40.1 | 35.3 | 34.7 |
| Lead concentrate average grade | (%) | 59.69 | 56.52 | 54.20 |
| Lead average recovery | (%) | 81.63 | 79.80 | 75.43 |
| Copper average ore grade | (%) | 0.39 | 0.40 | 0.38 |
| Copper concentrate produced | (kt) | 23.9 | 19.7 | 18.2 |
| Copper concentrate average grade | (%) | 26.78 | 29.70 | 30.35 |
| Copper average recovery | (%) | 53.59 | 50.62 | 51.24 |

kt = thousand tons

(\*) Weighted average annual operating days based on total material mined and milled in the three active mines: Charcas, Santa Barbara, and Santa Eulalia.

#### Charcas

The Charcas mining complex is located 111 kilometers north of the city of San Luis Potosi in the State of San Luis Potosi, Mexico. Charcas is connected to the state capital by a paved highway of 130 kilometers. 14 kilometers from the southeast of the Charcas complex is the “Los Charcos” railroad station which connects with the Mexico-Laredo railway. Also, a paved road connects Charcas to the city of Matehuala via a federal highway and begins at the northeast of the Charcas townsite. The complex includes three underground mines (San Bartolo, Rey-Reina and La Aurora) and one flotation plant that produces zinc, lead and copper concentrates, with significant amounts of silver. The Charcas mining district was discovered in 1573 and operations in the 20th century began in 1911. The Charcas mine is characterized by low operating costs and good quality ores and is situated near the zinc refinery. The Charcas mine is now Mexico’s largest producer of zinc.

The Charcas complex’s equipment includes:

- Twenty one jumbo drilling tools,
- twenty scoop trams for mucking and loading,
- thirteen trucks,
- two locomotives for internal ore haulage, and
- three hoists.

In addition, the mill has:

- One primary crusher,
- one secondary crusher,
- two tertiary crushers,
- four mills, and
- three flotation circuits.

#### Geology

The Charcas mining district occupies the east-central part of the Mexican Central Mesa and is part of the Sierra Madre metallogenic province. Geological history starts in the Superior Triasic, where sandy clay sediments were deposited argilloarenaceous. Due to emersion in the beginning of the Jurassic Superior, the sediments suffered intense erosion, settling on continental sediments. This sequence was affected by tectonic effort, which folded and failed on this rock package. Later the positioning of intrusive rocks originated fractures, which gave way to positioning of mineral deposits. The site’s paragenesis suggests two stages of mineralization. First minerals are rich in silver, lead and zinc, with abundant calcite and small quantities of quartz chalcopyrite. Second, there is a link of copper and silver, where the characteristic minerals are chalcopyrite, lead ore with silver content, pyrite and scarce sphalerite. Economic ore is found as replacement sulfurs in carbonates host rock. The ore mineralogy is comprised predominantly of calcopyrite (CuFeS2), sphalerite (ZnS), galena (PbS) and silver minerals as diaphorite (Pb2Ag3Sb3S8).

#### Mine exploration

In 2013, 29,376 meters of surface diamond drilling were executed and 19,917 meters from underground stations were drilled, which increased our reserves by 978,211 tons. For 2014, we plan a surface program of 30,000 meters to identify additional reserves.

The table below sets forth 2013, 2012 and 2011 production information for our Charcas mine:

|  |  | 2013 | 2012 | 2011 |
| --- | --- | ---: | ---: | ---: |
| Annual operating days |  | 324 | 319 | 324 |
| Total material mined and milled | (kt) | 1,180 | 1,164 | 1,124 |
| Zinc average ore grade | (%) | 4.0 | 4.4 | 4.8 |
| Zinc concentrate produced | (kt) | 83.9 | 93.2 | 93.6 |
| Zinc concentrate average grade | (%) | 54.49 | 53.89 | 56.25 |
| Zinc average recovery | (%) | 96.65 | 97.50 | 97.01 |
| Lead average ore grade | (%) | 0.2 | 0.3 | 0.4 |
| Lead concentrate produced | (kt) | 1.8 | 3.7 | 5.4 |
| Lead concentrate average grade | (%) | 34.61 | 40.50 | 50.10 |
| Lead average recovery | (%) | 33.02 | 50.30 | 65.38 |
| Copper average ore grade | (%) | 0.32 | 0.27 | 0.24 |
| Copper concentrate produced | (kt) | 9.6 | 4.7 | 3.7 |
| Copper concentrate average grade | (%) | 22.47 | 27.54 | 29.70 |
| Copper average recovery | (%) | 56.84 | 41.57 | 40.34 |

54 kt = thousand tons

The Charcas mine uses the hydraulic cut-and-fill method and the room-and-pillar mining method with descending benches. The broken ore is hauled to the underground crusher station. The crushed ore is then hoisted to the surface for processing in the flotation plant to produce lead, zinc and copper concentrates. The capacity of the flotation plant is 4,100 tons of ore per day. The lead concentrate produced at Charcas is treated at a third party refinery in Mexico. The zinc concentrates are treated at our San Luis Potosi zinc refinery and the copper concentrates are treated at our La Caridad smelter.

#### Santa Barbara

The Santa Barbara mining complex is located approximately 26 kilometers southwest of the city of Hidalgo del Parral in southern Chihuahua, Mexico. The area can be reached via paved road from Hidalgo del Parral, a city on a federal highway. Chihuahua, the state capital is located 250 kilometers north of the Santa Barbara complex. Additionally, El Paso on the Texas border is located 600 kilometers north of Santa Barbara. Santa Barbara includes three main underground mines (San Diego, Segovedad and Tecolotes) and a flotation plant and produces lead, copper and zinc concentrates, with significant amounts of silver. Gold-bearing veins were discovered in the Santa Barbara district as early as 1536. Mining activities in the 20th century began in 1913.

The mining operations at Santa Barbara are more diverse and complex than any of the other mines in our Mexican operations, with veins that aggregate approximately 21 kilometers in length. Each of the three underground mines has several shafts and crushers. Due to the variable characteristics of the ore bodies, four types of mining methods are used: shrinkage stoping, long-hole drilled open stoping, cut-and-fill stoping and horizontal bench stoping. The ore, once crushed, is processed in the flotation plant to produce concentrates. The flotation plant has a capacity of 5,700 tons of ore per day. The lead concentrate produced is treated at a third party refinery in Mexico. The copper concentrates are treated at our La Caridad smelter and the zinc concentrates are either treated at the San Luis Potosi zinc refinery or exported.

The major mine equipment at Santa Barbara includes:

- Twenty-four jumbo drilling tools,
- one Simba drilling tool,
- forty-six scoop trams,
- fourteen trucks for internal ore haulage,
- eleven locomotives for internal ore haulage,
- four locomotives for surface haulage,
- seven trucks for external haulage, and
- six hoists.

The concentrator plant has a milling capacity of 5,800 tons of ore per day and includes the following equipment:

- Six primary jaw crushers,
- one secondary crusher,
- two tertiary crushers,
- three mills, and
- three flotation circuits.

#### Geology

The majority of the production from the district comes from quartz veins within faults and fractures. The north to northwestern trending vein is up to several kilometers long, dips steeply to the west and is 0.5 to 30 meters wide. Ore shoots up to several hundred meters in length, extends to at least 900 meters below the surface and is separated from other ore by 0.5 to 1 meter of barren quartz vein. Metal zoning occurs in some veins, with zinc and lead content generally decreasing with depth and copper increasing with depth. Three main systems of veins exist inside the district, represented by the veins Coyote, Segovedad Novedad and Coyote Seca Palmar. In addition to the main veins, there are many smaller sub-parallels to branching ore bearing veins. Economic ore minerals include sphalerite (ZnS), marmatite (ZnFeS), galena (PbS), chalcopyrite (CuFeS2) and tetrahedrite (CuFe12Sb4S13). Gangue minerals include quartz (SiO2), pyrite (FeS2), magnetite (Fe2O4), pirrotite (Fe2+S), arsenopyrite (FeAsS) and fluorite (CaF2).

The Santa Barbara district has mineralization to indicate that it will continue to be a significant producer of lead, copper and zinc for decades. The full potential of the district has not yet been defined, but the area seems to justify an increase in exploration.

#### Mine Exploration:

In 2013 we drilled 52,513 meters from the surface and 15,060 meters from underground stations, which increased reserves by 2,076,100 tons. For 2014, 46,000 meters of diamond drilling are planned to identify additional reserves.

The table below sets forth 2013, 2012 and 2011 production information for our Santa Barbara mines:

|  |  | 2013 | 2012 | 2011 |
| --- | --- | ---: | ---: | ---: |
| Annual operating days |  | 301 | 322 | 321 |
| Total material mined and milled | (kt) | 1,595 | 1,590 | 1,553 |
| Zinc average ore grade | (%) | 2.52 | 2.41 | 2.33 |
| Zinc concentrate produced | (kt) | 63.9 | 60.5 | 57.7 |
| Zinc concentrate average grade | (%) | 53.86 | 54.29 | 53.85 |
| Zinc average recovery | (%) | 85.6 | 85.7 | 85.9 |
| Lead average ore grade | (%) | 1.32 | 1.18 | 1.07 |
| Lead concentrate produced | (kt) | 29.5 | 27.6 | 24.3 |
| Lead concentrate average grade | (%) | 60.80 | 59.64 | 58.91 |
| Lead average recovery | (%) | 85.04 | 87.82 | 86.20 |
| Copper average ore grade | (%) | 0.49 | 0.52 | 0.51 |
| Copper concentrate produced | (kt) | 14.4 | 15.0 | 14.6 |
| Copper concentrate average grade | (%) | 29.65 | 30.39 | 30.51 |
| Copper average recovery | (%) | 54.51 | 55.07 | 56.13 |

kt = thousand tons

#### Santa Eulalia

The mining district of Santa Eulalia is located in the central part of the state of Chihuahua, Mexico, approximately 26 kilometers east of the city of Chihuahua. This district covers approximately 48 square kilometers and is divided into three fields: east field, central field and west field. The west field and the east field, in which the principal mines of the complex are found, are separated by six kilometers. The Buena Tierra mine is located in the west field and the San Antonio mine is located in the east field. The mining district was discovered in 1590, although exploitation did not formally begin until 1870.

The district of Santa Eulalia is connected to the city of Chihuahua by a paved road (highway no. 45), at a distance of ten kilometers there is a paved detour to Aquiles Serdan and Francisco Portillo (also known as Santo Domingo) where the Company’s offices and the Buena Tierra mine are located. Access to the Buena Tierra mine and San Antonio mine is via an 11 kilometer unpaved road.

In May 2010, the Santa Eulalia mine suspended operations due to a flooding in the area brought on by the failure of a dike caused by excess water pressure. In 2011, the rehabilitation work was interrupted by a second flooding which required us to extend the pumping work. The pumping work was completed in April 2013 allowing us to restore production.

The flotation plant, at which lead and zinc concentrates are produced, has a capacity of 1,450 tons of ore per day. The lead concentrate is treated at a third party refinery, and the zinc concentrate is treated at our San Luis Potosi refinery.

Major mine equipment at the Santa Eulalia mine includes:

- Five Jumbo drilling tools,
- eleven scoop trams for mucking and loading,
- three trucks, and
- three hoists.

The concentrator plant has a milling capacity of 1,450 tons of ore per day and includes the following equipment:

- Two underground primary crushers,
- one secondary crusher,
- one tertiary crusher,
- two screen,
- one mill, and
- two flotation circuits.

#### Geology

Santa Eulalia is the largest of a number of similar districts that lie along the intersection of the Laramide-aged Mexican Thrust Belt and the Tertiary volcanic plateau of the Sierra Madre Occidental. Deposits throughout the belt occur in a thick Jurassic-Cretaceous carbonate succession that overlies Paleozoic or older crust.

The main sedimentary rock in the Santa Eulalia district is the Lower Cretaceous Limestone. These are irregularly covered by volcanic sedimentary conglomerates that are overlaid by volcanic rocks of the tertiary and alluvial material of the Quaternary Age.

In the Santa Eulalia mining district a thickness of 500 meters of sedimentary rocks is known to exist which consists of the following formations: 1) Formation Lagrima (limestone fossils); 2) Formation Glen Rose (limestone blue and at its base a black limestone appears); and 3) Formation Cuchillo (limestone with shale). Dikes and sills of rhyolite composition and sills of diabase also exist.

In the district there are several systems of fractures and faults associated with the emplacement of felsitic and maphic intrusives. The most important controller of the ore bodies are the north-south fractures.

The mineralization corresponds in its majority to ore skarns — silicoaluminates of calcium, iron and manganese with variable quantities of lead, zinc, copper and iron sulfides, located in the planes of crossings in the interstices of the silicates. Economic ore is found as replacement in the Limestone Glen Rose in the contact with dikes and sills and replacements in diabase sills. The mineralogy is comprised predominantly of sphalerite (ZnS), galena (PbS) and small quantities of pyrargyrite (Ag3SbS3).

#### Mine Exploration

In 2013 we drilled 17,440 meters from the surface and 3,666 meters from underground stations, which increased our reserves by 373,140 tons. For 2014, an additional diamond drilling program of 20,000 meters is planned to increase reserves.

The table below sets forth 2013, 2012 and 2011 production information for our Santa Eulalia mine:

|  |  | 2013 | 2012 | 2011 |
| --- | --- | ---: | ---: | ---: |
| Annual operating days |  | 296 | 257 | 217 |
| Total material mined and milled | (kt) | 290.4 | 154.3 | 154.3 |
| Zinc average ore grade | (%) | 7.64 | 5.95 | 7.15 |
| Zinc concentrate produced | (kt) | 37.5 | 13.3 | 0.1 |
| Zinc concentrate average grade | (%) | 51.37 | 51.46 | 35.03 |
| Zinc average recovery | (%) | 86.92 | 74.63 | 0.34 |
| Lead average ore grade | (%) | 2.20 | 2.08 | 2.72 |
| Lead concentrate produced | (kt) | 8.9 | 4.0 | 5.0 |
| Lead concentrate average grade | (%) | 60.99 | 49.96 | 35.80 |
| Lead average recovery | (%) | 84.52 | 61.47 | 42.74 |

kt = thousand tons

#### San Martin

San Martin has been on strike since July 2007. Please see Note 13 “Commitments and Contingencies” to our consolidated financial statements.

The San Martin mining complex is located in the municipality of Sombrerete in the western part of the state of Zacatecas, Mexico, approximately 101 kilometers southeast of the city of Durango and nine kilometers east of the Durango State boundary. Access to the property is via a federal highway between the cities of Durango and Zacatecas. A paved six kilometer road connects the mine and town of San Martin with the highway. The city of Sombrerete is about 16 kilometers east of the property. The complex includes an underground mine and a flotation plant and produces lead, copper and zinc concentrates, with significant amounts of silver. The mining district in which the San Martin mine is located was discovered in 1555. Mining operations in the 20th century began in 1949. San Martin lies in the Mesa Central between the Sierra Madre Occidental and the Sierra Madre Oriental.

The horizontal cut-and-fill mining method is used at the San Martin mine. The broken ore is hauled to the underground crusher station. The ore is then brought to the surface and fed to the flotation plant to produce concentrates. The flotation plant has a total capacity of 4,400 tons of ore per day. The lead concentrate is treated at a third party refinery in Mexico. The copper concentrate was treated at our San Luis Potosi copper smelter and the zinc concentrate is either treated at the San Luis Potosi zinc refinery or exported.

The major mine equipment at San Martin includes:

- Eight jumbo drilling tools,
- thirteen scoop trams,
- nine trucks, and
- three hoists.

The concentrator plant has a mill capacity of 4,400 tons of ore per day and includes the following equipment:

- Two primary jaw crushers,
- two secondary crushers,
- one tertiary crusher,
- two mills, and
- three flotation circuits.

#### Geology

San Martin lies in the Central Mesa between two major geologic provinces, Sierra Madre Occidental and Sierra Madre Oriental. The main sedimentary rock-formation in the San Martin district is the Upper Cretaceous Age Cuesta del Cura limestone. The formation is an interlayered sequence of shallow marine limestone and black chert, and it is overlain by Indura formation which outcrops at the foot of the topographic heights of the Cuesta del Cura formation. It consists mainly of alternating shales and fine-grained clayed limestones in ten to thirty centimeter thick layers.

The district’s most important mineral deposits are replacement veins and bodies generated in the skarn by Cerro de la Gloria granodiorite intrusion. An extensive zone of skarn west of the intrusive hosts, the San Marcial, Ibarra and Gallo-Gallina main ore veins, which appear at the surface for distances of up to 1,000 meters, with thicknesses of 40 centimeters to four meters, paralleling the intrusive contact. In the central part of the deposit there is a horizontal zoning with respect to the contact of the intrusive with high values of silver and copper. In the top of the deposit there is mostly lead and zinc. In the northeast/east over concentric structures to the intrusive there is an increment of lead, zinc and silver in the skarn. Economic ore is found as replacement ore bodies between the main veins as massive and disseminated sulfides with widths from eight meters up to 200 meters. These bodies consist mostly of chalcopyrite (CuFeS2), sphalerite (ZnS), galena (PbS), bornite (Cu5FeS4), tetrahedrite (CuFe12Sb4S13), native silver (Ag), pyrrite (FeS), arsenopyrite (FeAsS) and stibnite (Sb2S3). Molybdenum and tungsten are found in little portions in the skarn near the contact associated with the calcite.

#### Mine Exploration

There was no mine exploration drilling in the three years ending December 31, 2013 because the San Martin mine was on strike.

There was no production at the San Martin mine in the three years ending December 31, 2013. The following table summarizes the estimated production losses at our San Martin mine due to the strike:

|  | 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Days of strike | 365 | 366 | 365 |
| Estimated strike production loss (tons): |  |  |  |
| Zinc in concentrates | 10,264 | 10,264 | 10,264 |
| Lead in concentrates | 500 | 500 | 500 |
| Copper in concentrates | 4,360 | 4,360 | 4,360 |

#### Taxco

Taxco has been on strike since July 2007. Please see Note 13 “Commitments and Contingencies” to our consolidated financial statements.

The Taxco mining complex is located on the outskirts of the city of Taxco in the northern part of the state of Guerrero, Mexico, approximately 71 kilometers from the city of Cuernavaca, Morelos, where access through the highway to the complex is possible. The complex includes several underground mines (San Antonio, Guerrero and Remedios) and a flotation plant and produces lead and zinc concentrates, with some amounts of gold and silver. The mining district in which the Taxco mines are located was discovered in 1519. Mining activities in the 20th century commenced in 1918. The Taxco district lies in the northern part of the Balsas-Mexcala basin adjacent to the Paleozoic Taxco-Zitacuaro Massif.

We employ shrinkage, cut-and-fill and the room and pillar mining methods at the Taxco mines. The flotation plant has a capacity of 2,000 tons of ore per day. The lead concentrate is treated at a third party refinery in Mexico. The zinc concentrate is either treated at the San Luis Potosi zinc refinery or exported.

The major mine equipment at the Taxco complex includes:

- Four Jumbo drilling tools,
- ten scoop trams for mucking and loading,
- five trucks for internal ore haulage,
- three locomotives for internal ore haulage, and
- three hoists.

The concentrator plant has a milling capacity of 2,000 tons of ore per day and includes the following equipment

- Two primary crushers,
- one secondary crusher,
- two tertiary crushers,
- three mills, and
- two flotation circuits.

#### Geology

The Taxco district is stratigraphically formed of rocks from Jurassic to recent periods, which are described below, with emphasis on the mineralization control characteristics. The Taxco schist is composed of a series of schists and fylites, most likely from a volcanic-sedimentary sequence of tufa and limonites. They represent a sequence of metamorphological arch and its age has been defined as Jurassic Medium. The Morelos formation from the Upper Cretaceous age (Apian-Turonian) lies on a discordant form over Taxco schist and its contact is several times marked by a clay zone (mylonites) and breccia, which implies a shifting of this unit over the schist (packs). The Mezcala formation is constituted by a sequence of shale and sandstone with some inter-stratified layers of limestone. Its base is calcarean. Its top tends to be rich in clay with thin limestone layers. The Balsas group is constituted by conglomerates and is sandy on its base, rests in discordance form on an erosioned surface from the Mexcala formation. The Tilzapotla Rhyolite is the newest rock, which emerged in the district before the alluvial deposit. It is formed of flux, breccia, tuffaceous, ignimbrites and vitrophyrre of rhyolite composition.

There are four types of ore deposits found in Taxco district. In order of importance they are as follows: fissure-filling veins, replacement veins, blanket-like replacement bodies (so called “mantos”), stock works and brecciate chimneys. The three first ones are intimately related and they were formed in the same era, although in different stages.

The veins reach up to two kilometers in length with a variable potency of thirty centimeters up to eight meters, which is the case of copper veins at the mines of Guerrero, Hueyapa and Palo Amarillo at the San Antonio mine; the Remedios mine has among other veins, El Muerto and El Cristo one kilometer long and five meters in average potency.

Economic ore is found in the deposit in veins. Ore mineral include argentiferous galena (PbS), sphalerite (ZnS), pyrargyrite (Ag3SbS3), and other sulfosalts, and replacement “mantos.” The most mineralized zones are in the vicinity of the veins with the limestone. The mineralization is more intensive in the base of the limestone and consists of sphalerite (ZnS), galena (PbS), pyrite (FeS) and magnetite (FeOFe2O3).

#### Mine Exploration

There was no mine exploration drilling in the three years ending December 31, 2013 at the Taxco mine was on strike.

There was no production at the Taxco mine in the three years ending December 31, 2013. The following table summarizes the estimated production losses at our Taxco mine due to the strike:

|  | 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Days of strike | 365 | 366 | 365 |
| Estimated strike production loss (tons): |  |  |  |
| Zinc in concentrates | 13,270 | 13,270 | 13,270 |
| Lead in concentrates | 2,225 | 2,225 | 2,225 |

#### Processing Facilities - San Luis Potosi

Our San Luis Potosi electrolytic zinc refinery is located in the city of San Luis Potosi, in the state of San Luis Potosi, Mexico. The San Luis Potosi copper smelter is adjacent to the refinery. The city of San Luis Potosi is connected to our refinery and smelter by a major highway.

#### Smelter

Our San Luis copper smelter was closed in 2010, and copper concentrates previously smelted at this plant are now sent to La Caridad for smelting. We have initiated a program for plant demolition and soil remediation with a revised budget of $62.4 million, of which we have spent $35.7 million at December 31, 2013. Plant demolition and construction of a confinement area at the south of the property were completed in 2012 and we expect to complete soil remediation and the construction of a second confinement by the end of 2014. We will deposit metallurgical and other waste material resulting from plant demolition in the confinement areas. We expect that once the site is remediated, we will decide if we will sell the property or promote an urban development to generate a net gain on the disposal of the property.

#### Zinc Refinery

The San Luis Potosi electrolytic zinc refinery was built in 1982. It was designed to produce 105,000 tons of refined zinc per year by treating up to 200,000 tons of zinc concentrate from our own mines, principally Charcas, which is located 113 kilometers from the refinery. The refinery produces special high grade zinc (99.995% zinc), high grade zinc (over 99.9% zinc) and zinc-based alloys with aluminum, lead, copper or magnesium in varying quantities and sizes depending on market demand. Refined silver and gold production is obtained from tolling services provided by a third party mining company.

The electrolytic zinc refinery’s major equipment includes:

- One roaster with 85 square meters of roasting area,
- one steam recovery boiler, and
- one acid plant.

There is a calcine processing area with five leaching stages: neutral, hot acid, intermediate acid, acid, purified fourth and jarosite, as well as two stages for solution purifying. Additionally, the equipment includes:

- One cell house with two electrowinning circuits to finally obtain metallic zinc,
- one alloy and molding area with two induction furnaces and four molding systems, two of them with chains to produce 25 kilogram ingots, and
- two casting wheels to manufacture one ton jumbo pieces.

The table below sets forth 2013, 2012 and 2011 production information for our San Luis Potosi zinc refinery:

|  |  | 2013 | 2012 | 2011 |
| --- | --- | ---: | ---: | ---: |
| Total zinc concentrate treated | (kt) | 193.7 | 173.2 | 174.8 |
| Refined zinc produced | (kt) | 97.7 | 93.5 | 90.9 |
| Sulfuric acid produced | (kt) | 175.2 | 159.1 | 158.0 |
| Refined silver produced | (kt) | 11.6 | 15.6 | 13.7 |
| Refined gold produced | (k) | 9.0 | 14.7 | 14.2 |
| Refined cadmium produced | (kt) | 0.6 | 0.6 | 0.6 |
| Average refinery recovery | (%) | 94.5 | 95.4 | 95.2 |
| Average realized price refined zinc | ($ per lb) | 92.4 | 95.0 | 1.05 |
| Average realized price zinc concentrate | ($ per lb) | 82.5 | — | — |
| Average realized price silver | ($ per oz) | 22.95 | 31.29 | 35.08 |

kt = thousand tons

#### Nueva Rosita Coal and Coke Complex

The Nueva Rosita coal and coke complex began operations in 1924 and is located in the state of Coahuila, Mexico on the outskirts of the city of Nueva Rosita near the Texas border. It includes a) an underground coal mine, which has been closed since 2006; b) an open-pit mine with a yearly capacity of approximately 350,000 tons of coal; c) a coal washing plant with a capacity of 900,000 tons per year that produces high quality clean coal; and d) a re-engineered and modernized 21 ovens coke facility capable of producing 100,000 tons of coke per year (metallurgical, nut and fine) of which, 95,000 tons are metallurgical coke. There is also a by-product plant to clean the coke gas oven in which tar, ammonium sulfate and light crude oil are recovered. There are also two boilers, which produce 80,000 pounds of steam that is used in the by-products plant. The re-engineering and modernization of 21 ovens was completed in April 2006. We believe the plant’s equipment is in good physical condition and suitable for our operations.

Coke production is sold to Penoles and other Mexican consumers in northern Mexico. We sold 76,831 tons, 69,638 tons and 82,014 tons of metallurgical coke in 2013, 2012 and 2011, respectively. We expect to sell 85,360 tons of metallurgical coke in 2014.

#### Carbon mine exploration

In Coahuila, an intensive exploration program of diamond drilling has identified two additional areas, Esperanza with a potential for more than 30 million tons of “in place” mineralized coal and Guayacan with a potential for 15 million tons of “in place” mineralized coal, that could be used for a future coal-fired power plant. In 2010 and 2011, 1,213 and 2,640 meters of diamond drilling, respectively, were completed at the Rosita pit area and as a result, 10,100 tons and 178,000 tons of coal, respectively, were added to the reserves estimates for this open-pit mine. In addition in 2012, 3,793 meters of drilling were completed at the La Conquista, Nueva Rosita and La Lavadora pits. In 2013 we drilled 2,451 meters and increased our coal reserve estimate by 39,552 tons at the La Conquista pit. For 2014, we expect to execute a 600 meter drilling program to increase the reserves in this pit.

The table below sets forth 2013, 2012 and 2011 production information for our Nueva Rosita coal and coke complex:

|  | 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Coal mined — open-pit (kt) | 291.5 | 325.3 | 238.5 |
| Average BTU content BTU/Lb | 9,485 | 9,000 | 9,400 |
| Average percent sulfur% | 1.87 | 1.50 | 1.00 |
| Clean coal produced (kt) | 141.3 | 148.2 | 103.9 |
| Coke tonnage produced (kt) | 93.2 | 91.2 | 84.4 |
| Average realized price - Coal ($ per ton) | 46.8 | 38.1 | 29.8 |
| Average realized price - Arsenic clean coal ($ per ton) | 78.33 | — | 56.14 |
| Average realized price - Coke ($ per ton) | 299.58 | 318.7 | 292.6 |

kt = thousand tons

ORE RESERVES

Ore reserves are those estimated quantities of proven and probable material that may be economically mined and processed for extraction of their mineral content, at the time of the reserve determination. “Proven” (measured) reserves are reserves for which (a) quantity is computed from dimensions revealed in outcrops, trenches, workings or drill holes; (b) grade and/or quality are computed from the results of detailed samplings; and (c) the sites for inspection, sampling and measurement are spaced so closely and the geologic character is so well defined that size, shape, depth and mineral content of reserves are well-established. “Probable” (indicated) reserves are reserves for which quantity and grade and/or quality are computed from information similar to that used for proven (measured) reserves, but the sites for inspection, sampling, and measurement are farther apart or are otherwise less adequately spaced. The degree of assurance, although lower than that for proven (measured) reserves, is high enough to assume continuity between points of observation. “Mineralized material,” on the other hand, is a mineralized body that has been delineated by appropriately spaced drilling and/or underground sampling to support the reported tonnage and average grade of metal(s). Such a deposit does not qualify as a reserve until legal and economic feasibility are concluded based upon a comprehensive evaluation of unit costs, grade, recoveries and other material factors.

Our proven and probable ore reserve estimates are based on engineering evaluations of assay values derived from the sampling of drill holes and other openings. We believe that the samplings taken are spaced at intervals sufficiently close enough and the geological characteristics of the deposits are sufficiently well defined to render the estimates reliable. The ore reserves estimates include assessments of the resource, mining and metallurgy, as well as economic, marketing, legal, environmental, governmental, social and other necessary considerations.

Our Peruvian operations, including the Toquepala and Cuajone reserves, are classified into proven (measured), probable (indicated) and possible (inferred) categories based on a RCB Index (Relative Confidence Bound Index) that measures our level of geologic knowledge and confidence in each block. The RCB index is a measure of relative confidence in the block grade estimate. This approach combines the local variability of the composites used to krig a block with the kriging variance and incorporates the use of confidence intervals in measuring uncertainty of the block estimates relative to each other. The final resource classification is then based on the distribution of these RCB values for blocks above 0.05% copper. It is the distribution that is used to find the breaks between proven/probable and probable/possible.

Our Mexican operations, including the Buenavista and La Caridad reserves, are calculated using a mathematical block model and applying the MineSight software system. The estimated grades per block are classified as proven and probable. These grades are calculated applying a three-dimensional interpolation procedure and the inverse distance squared. Likewise, the quadrant method or spherical search is implemented in order to limit the number of composites that will affect the block’s interpolated value. The composites data is derived from the geological exploration of the ore body. In order to classify the individual blocks in the model, a thorough geostatistical variogram analysis is conducted, taking into consideration the principal characteristics of the deposit. Based on this block model classification, and with the implementation of the Lerch-Grossman algorithm, and the MineSight Pit Optimizer procedure, mineable reserves are determined. The calculated proven and probable reserves include those blocks that are economically feasible to mine by open-pit method within a particular mine design.

For the IMMSA unit, the basis for reserve estimations are sampling of mining operations and drilling exploration, geographical and topographic surveys, tracking down all the foregoing in the corresponding maps, measurement, calculation and interpretation based on the maps and reports from the mines, the mills and/or smelters. Mineral reserves are mineral stock which is estimated for extraction, to exploit if necessary, to sell or utilize economically, all or in part, taking into consideration the quotations, subsidies, costs, availability of treatment plants and other conditions which we estimate will prevail in the period for which reserves are being calculated. The reserves are divided into proven (85% reliable or more according to statistical studies) and probable (70-80% reliable or more according to statistical studies) categories according to their level of reliability and availability. In order to comply with SEC regulations, proven reserves is a classification that can only be used for such mineral found on top of the last level of the mine (either mineral up to 15 meters below the last level or below the first 15 meters only with sufficient drilling (25 or 30 meters between each drill)).

Annually our engineering department reviews in detail the reserve computations. In addition, our engineering department reviews the computation when changes in assumptions occur. Changes can occur for price or cost assumptions, results in field drilling or new geotechnical parameters. We also engage third party consultants to review mine planning procedures.

Pursuant to SEC guidance, the reserves information in this report are calculated using average metals prices over the most recent three years unless otherwise stated. We refer to these three-year average metals prices as “current prices.” Our current prices for copper are calculated using prices quoted by COMEX, and our current prices for molybdenum are calculated according to Platt’s Metals Week. Unless otherwise stated, reserves estimates in this report use $3.65 per pound for copper and $12.74 per pound for molybdenum, both current prices as of December 31, 2013. The current prices for copper and molybdenum were $3.68 and $14.52 as of December 31, 2012 and $3.26 and $13.95 as of December 31, 2011, respectively.

For internal ore reserve estimation, our management uses long-term metal price assumptions for copper and molybdenum, of $2.00 per pound of copper and $12.00 per pound of molybdenum to reflect the changes in market trends. These prices continued at December 31, 2013. For other forecast and planning purposes, particularly related to merger and acquisition activities, our management considers various other price scenarios. The use of these other price assumptions does not affect the preparation of our financial statements.

For the years 2013, 2012 and 2011, we have used reserves estimates based on current average prices as of the most recent year then ended to determine amortization of mine development and intangible assets.

We periodically reevaluate estimates of our ore reserves, which represent our estimate as to the amount of unmined copper remaining in our existing mine locations that can be produced and sold at a profit. These estimates are based on engineering evaluations derived from samples of drill holes and other openings, combined with assumptions about copper market prices and production costs at each of our mines.

The persons responsible for ore reserve calculations are as follows:

Peruvian open-pit:

Cuajone mine — Edgar A. Pena Valenzuela, Superintendent Mine Engineering

Toquepala mine — Wilbert Perez, Superintendent Mine Engineering

Tia Maria project:

Jaime Arana Murriel — Leaching Manager — Investment projects

Jorge Parisuana Ccapa - Mine Engineer — Investment projects

Marvin Acosta Valdivia - Mine Engineer — Investment projects

Mexican open-pit:

La Caridad Mine - Marco A. Figueroa, Engineering and Mine Planning Superintendent

Buenavista mine — Jesus Molinares, Engineering and Mine Planning Superintendent

IMMSA unit:

Santa Barbara - Jorge M. Espinosa, Planning and Control Superintendent

Charcas — Juan J. Aguilar, Planning and Control Superintendent

Santa Eulalia — Juan M. Martinez, Planning and Control Superintendent

Taxco - Marco A. Gonzalez, Chief of Geology

San Martin - Maria I. Carrillo, Chief Engineer

El Arco project:

Fred Fest — Engineering advisor - Mintec Inc.

Angangueo project:

James E. Lonergan — Engineering advisor - Mintec Inc.

For more information regarding our reserve estimates, please see Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” — “Critical Accounting Policies and Estimates” — “Ore Reserves.”

#### Ore Reserves Estimated at Current Prices:

The table below details our estimated proven and probable copper and molybdenum reserves at December 31, 2013 based on the last three year average market prices following SEC guidance:

| Mineral Reserves Metal prices: | PERUVIAN OPEN-PIT UNIT Cuajone Mine (1) | Toquepala Mine (1) | MEXICAN OPEN-PIT UNIT Buenavista Mine (1) | La Caridad Mine (1) | TOTAL OPEN-PIT MINES | MEXICAN IMMSA UNIT (2) | DEVELOPMENT PROJECTS Tia Maria | El Arco | Angangueo |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Copper ($/lb.) | 3.654 | 3.654 | 3.654 | 3.654 | 3.654 | 3.654 | 3.654 | 3.654 | 3.654 |
| Molybdenum ($/lb.) | 12.736 | 12.736 | 12.736 | 12.736 | 12.736 |  |  | 12.736 |  |
| Cut-off grade | 0.155% | 0.185% | 0.124% | 0.120% | 0.140% |  |  | 0.128% |  |
| Proven |  |  |  |  |  |  |  |  |  |
| Sulfide ore reserves (kt) | 1,225,121 | 2,368,378 | 3,982,113 | 2,869,410 | 10,445,022 | 18,944 |  | 1,284,798 | 1,530 |
| Average grade: |  |  |  |  |  |  |  |  |  |
| Copper | 0.544% | 0.523% | 0.422% | 0.228% | 0.406% | 0.450% |  | 0.436% | 1.690% |
| Molybdenum | 0.019% | 0.030% | 0.007% | 0.028% | 0.019% |  |  | 0.007% |  |
| Lead |  |  |  |  |  | 1.110% |  |  | 0.430% |
| Zinc |  |  |  |  |  | 2.760% |  |  | 2.630% |
| Leachable material (kt) | 2,441 | 606,831 | 1,700,937 | 147,021 | 2,457,230 |  | 223,189 | 165,178 |  |
| Leachable material grade | 0.607% | 0.208% | 0.146% | 0.175% | 0.164% |  | 0.319% | 0.369% |  |
| Probable |  |  |  |  |  |  |  |  |  |
| Sulfide ore reserves (kt) | 1,017,744 | 380,904 | 1,689,770 | 1,372,493 | 4,460,911 | 29,821 |  | 806,126 | 5,106 |
| Average grade: |  |  |  |  |  |  |  |  |  |
| Copper | 0.391% | 0.318% | 0.376% | 0.207% | 0.322% | 0.510% |  | 0.362% | 1.300% |
| Molybdenum | 0.016% | 0.010% | 0.006% | 0.029% | 0.016% |  |  | 0.007% |  |
| Lead |  |  |  |  |  | 0.860% |  |  | 0.440% |
| Zinc |  |  |  |  |  | 2.960% |  |  | 2.630% |
| Leachable material (kt) | 6,636 | 1,067,685 | 643,954 | 54,360 | 1,772,635 |  | 546,856 | 67,818 |  |
| Leachable material grade | 0.574% | 0.138% | 0.126% | 0.163% | 0.136% |  | 0.355% | 0.197% |  |
| Total |  |  |  |  |  |  |  |  |  |
| Sulfide ore reserves (kt) | 2,242,865 | 2,749,282 | 5,671,883 | 4,241,903 | 14,905,933 | 48,765 |  | 2,090,924 | 6,636 |
| Average grade: |  |  |  |  |  |  |  |  |  |
| Copper | 0.475% | 0.495% | 0.408% | 0.221% | 0.381% | 0.487% |  | 0.407% | 1.390% |
| Molybdenum | 0.018% | 0.027% | 0.007% | 0.028% | 0.018% |  |  | 0.007% |  |
| Lead |  |  |  |  |  | 0.957% |  |  | 0.438% |
| Zinc |  |  |  |  |  | 2.882% |  |  | 2.630% |
| Leachable material (kt) | 9,077 | 1,674,516 | 2,344,891 | 201,381 | 4,229,865 |  | 770,045 | 232,996 |  |
| Leachable material grade | 0.583% | 0.164% | 0.141% | 0.172% | 0.152% |  | 0.345% | 0.319% |  |
| Waste (kt) | 6,264,080 | 9,387,842 | 6,729,313 | 2,608,598 | 24,989,833 |  | 701,485 | 1,878,387 |  |
| Total material (kt) | 8,516,022 | 13,811,640 | 14,746,087 | 7,051,882 | 44,125,631 | 48,765 | 1,471,530 | 4,202,307 | 6,636 |
| Stripping ratio ((W+L)/O) | 2.80 | 4.02 | 1.60 | 0.66 | 1.96 |  |  | 1.01 |  |
| Stripping ratio (W/(L+O)) | 2.78 | 2.12 | 0.84 | 0.59 | 1.31 |  | 0.91 | 0.81 |  |
| **Leachable material** |  |  |  |  |  |  |  |  |  |
| Reserves in stock (kt) | 20,403 | 1,291,638 | 956,610 | 693,743 | 2,962,394 |  |  |  |  |
| Average copper grade | 0.488% | 0.153% | 0.139% | 0.243% | 0.172% |  |  |  |  |
| In pit reserves: |  |  |  |  |  |  |  |  |  |
| Proven (kt) | 2,441 | 606,831 | 1,700,937 | 147,021 | 2,457,230 |  | 223,189 | 165,178 |  |
| Average copper grade | 0.607% | 0.208% | 0.146% | 0.175% | 0.164% |  | 0.319% | 0.369% |  |
| Probable (kt) | 6,636 | 1,067,685 | 643,954 | 54,360 | 1,772,635 |  | 546,856 | 67,818 |  |
| Average copper grade | 0.574% | 0.138% | 0.126% | 0.163% | 0.136% |  | 0.355% | 0.197% |  |
| Total leachable reserves (kt) | 29,480 | 2,966,154 | 3,301,501 | 895,124 | 7,192,259 |  | 770,045 | 232,996 |  |
| Average copper grade | 0.517% | 0.159% | 0.140% | 0.227% | 0.160% |  | 0.345% | 0.319% |  |
| **Copper contained in ore reserves in pit(kt) (3)** | 10,707 | 16,355 | 26,448 | 9,721 | 63,231 | 237 | 2,657 | 9,253 | 92 |

kt = Thousand tons

W= Waste, L= Leachable material; O= Ore.

(1) The Cuajone, Toquepala, Buenavista and La Caridad concentrator recoveries calculated for these reserves were 85.7%, 86.5%, 81.0%, and 80.7%, respectively, obtained by using recovery formulas according to the different milling capacity and geo-metallurgical zones.

(2) The IMMSA unit includes the Charcas, Santa Barbara, San Martin, Santa Eulalia and Taxco mines. Zinc and lead contained in ore reserves are as follows:

| (in thousand tons) | Proven | Probable | Total |
| --- | ---: | ---: | ---: |
| Zinc | 522.9 | 882.7 | 1,405.6 |
| Lead | 210.3 | 256.5 | 466.8 |

(3) Copper contained in ore reserves for open-pit mines is (i) the product of sulfide ore reserves and the average copper grade proven plus (ii) the product of sulfide ore reserves and the average copper grade probable plus (iii) the product of in-pit leachable reserves and the average copper grade. Copper contained in ore reserves for underground mines is the product of sulfide ore reserves and the average copper grade.

#### Metal Price Sensitivity:

In preparing the sensitivity analysis, we recalculated our reserves based on the assumption that current average metal prices were 20% higher and 20% lower, respectively, than the actual current average prices for year-end 2013. Reserve results of this sensitivity analysis are not proportional to the increase or decrease in metal price assumptions.

| Mineral Reserves Metal prices: | INCREASE — 20% Open-Pit Mines | IMMSA | Development Projects | DECREASE — 20% Open-Pit Mines | IMMSA | Development Projects |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Copper ($/lb.) | 4.384 | 4.384 | 4.384 | 2.923 | 2.923 | 2.923 |
| Molybdenum ($/lb.) | 15.283 |  | 15.283 | 10.189 |  | 10.189 |
| Cut-off grade | 0.115% |  | 0.104% | 0.173% |  | 0.166% |
| Proven |  |  |  |  |  |  |
| Sulfide ore reserves (kt) | 11,160,051 | 19,054 | 1,298,422 | 9,248,812 | 18,455 | 1,262,728 |
| Average grade: |  |  |  |  |  |  |
| Copper | 0.393% | 0.450% | 0.434% | 0.424% | 0.460% | 0.445% |
| Molybdenum | 0.018% |  | 0.007% | 0.020% |  | 0.007% |
| Lead |  | 1.100% | 0.420% |  | 1.130% | 0.440% |
| Zinc |  | 2.750% | 2.650% |  | 2.800% | 2.610% |
| Leachable material (kt) | 1,986,081 |  | 391,453 | 3,022,930 |  | 382,086 |
| Leachable material grade | 0.149% |  | 0.337% | 0.183% |  | 0.345% |
| Probable |  |  |  |  |  |  |
| Sulfide ore reserves (kt) | 4,938,654 | 30,341 | 837,333 | 3,765,164 | 28,432 | 746,348 |
| Average grade: |  |  |  |  |  |  |
| Copper | 0.310% | 0.500% | 0.359% | 0.340% | 0.520% | 0.386% |
| Molybdenum | 0.015% |  | 0.007% | 0.017% |  | 0.007% |
| Lead |  | 0.850% | 0.430% |  | 0.880% | 0.440% |
| Zinc |  | 2.930% | 2.630% |  | 2.980% | 2.610% |
| Leachable material (kt) | 1,660,198 |  | 623,706 | 1,746,871 |  | 592,733 |
| Leachable material grade | 0.122% |  | 0.332% | 0.156% |  | 0.345% |
| Total |  |  |  |  |  |  |
| Sulfide ore reserves (kt) | 16,098,705 | 49,394 | 2,135,755 | 13,013,976 | 46,887 | 2,009,076 |
| Average grade: |  |  |  |  |  |  |
| Copper | 0.367% | 0.481% | 0.405% | 0.400% | 0.496% | 0.423% |
| Molybdenum | 0.017% |  | 0.007% | 0.019% |  | 0.007% |
| Lead |  | 0.946% | 0.428% |  | 0.978% | 0.440% |
| Zinc |  | 2.861% | 2.635% |  | 2.909% | 2.610% |
| Leachable material (kt) | 3,646,279 |  | 1,015,159 | 4,769,801 |  | 974,819 |
| Leachable material grade | 0.137% |  | 0.334% | 0.173% |  | 0.345% |
| Waste (kt) | 25,980,877 |  | 2,583,925 | 22,721,816 |  | 2,245,758 |
| Total material (kt) | 45,725,861 | 49,394 | 5,734,839 | 40,505,539 | 46,887 | 5,229,653 |
| Stripping ratio ((W+L)/O) | 1.84 |  | 1.69 | 2.11 |  | 1.60 |
| Stripping ratio (W/(L+O)) | 1.32 |  | 0.82 | 1.28 |  | 0.75 |
| **Leachable material** |  |  |  |  |  |  |
| Reserves in stock (kt) | 2,962,394 |  |  | 2,962,394 |  |  |
| Average copper grade | 0.172% |  |  | 0.172% |  |  |
| In pit reserves: |  |  |  |  |  |  |
| Proven (kt) | 1,986,081 |  | 391,453 | 3,022,930 |  | 382,086 |
| Average copper grade | 0.149% |  | 0.337% | 0.183% |  | 0.345% |
| Probable (kt) | 1,660,198 |  | 623,706 | 1,746,871 |  | 592,733 |
| Average copper grade | 0.122% |  | 0.332% | 0.156% |  | 0.345% |
| Total leachable reserves (kt) | 6,608,673 |  | 1,015,159 | 7,732,195 |  | 974,819 |
| Average copper grade | 0.152% |  | 0.334% | 0.173% |  | 0.345% |
| **Copper contained in ore reserves in pit(kt) (1)** | 64,163 | 238 | 12,038 | 60,312 | 233 | 11,866 |

(1) Copper contained in ore reserves for open-pit mines is (i) the product of sulfide ore reserves and the average copper grade proven plus (ii) the product of sulfide ore reserves and the average copper grade probable plus (iii) the product of in-pit leachable reserves and the average copper grade. Copper contained in ore reserves for underground mines is the product of sulfide ore reserves and the average copper grade.

#### Internal Ore Reserves Estimates:

The table below details our proven and probable copper and molybdenum reserves as of December 31, 2013, estimated based on long-term price assumptions of $2.00 for copper and $12.00 for molybdenum. As discussed on page 63 the presentation of these internal ore reserve estimates are not compliant with SEC requirements, as the long-term price assumptions differ from the current prices used pursuant to SEC guidance. These internal ore reserve estimates do not affect the preparation of our financial statements.

| Mineral Reserves Metal prices: | PERUVIAN OPEN-PIT UNIT Cuajone Mine | Toquepala Mine | MEXICAN OPEN-PIT UNIT Buenavista Mine | La Caridad Mine | TOTAL OPEN-PIT MINES | MEXICAN IMMSA UNIT (1) | DEVELOPMENT PROJECTS Tia Maria | El Arco | Angangueo |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Copper ($/lb.) | 2.000 | 2.000 | 2.000 | 2.000 | 2.000 | 2.000 | 2.000 | 2.000 | 2.000 |
| Molybdenum ($/lb.) | 12.000 | 12.000 | 12.000 | 12.000 | 12.000 |  |  | 12.000 |  |
| Cut-off grade | 0.181% | 0.223% | 0.306% | 0.240% | 0.243% |  |  | 0.286% |  |
| Proven |  |  |  |  |  |  |  |  |  |
| Sulfide ore reserves(kt) | 1,078,934 | 2,105,230 | 1,804,311 | 2,148,709 | 7,137,184 | 15,954 |  | 1,187,465 | 1,383 |
| Average grade: |  |  |  |  |  |  |  |  |  |
| Copper | 0.559% | 0.562% | 0.597% | 0.255% | 0.478% | 0.480% |  | 0.460% | 1.850% |
| Molybdenum | 0.019% | 0.033% | 0.009% | 0.028% | 0.023% |  |  | 0.008% |  |
| Lead |  |  |  |  |  | 1.210% |  |  | 0.450% |
| Zinc |  |  |  |  |  | 3.040% |  |  | 2.520% |
| Leachable material (kt) | 1,986 | 795,473 | 2,665,667 | 485,648 | 3,948,774 |  | 200,819 | 163,921 |  |
| Leachable material grade | 0.693% | 0.208% | 0.237% | 0.152% | 0.221% |  | 0.341% | 0.371% |  |
| Probable |  |  |  |  |  |  |  |  |  |
| Sulfide ore reserves(kt) | 769,306 | 249,989 | 675,565 | 828,532 | 2,523,392 | 25,545 |  | 617,667 | 4,676 |
| Average grade: |  |  |  |  |  |  |  |  |  |
| Copper | 0.402% | 0.364% | 0.545% | 0.240% | 0.383% | 0.560% |  | 0.416% | 1.410% |
| Molybdenum | 0.017% | 0.012% | 0.008% | 0.029% | 0.018% |  |  | 0.008% |  |
| Lead |  |  |  |  |  | 0.910% |  |  | 0.450% |
| Zinc |  |  |  |  |  | 3.100% |  |  | 2.580% |
| Leachable material (kt) | 5,918 | 933,249 | 784,753 | 145,605 | 1,869,525 |  | 477,909 | 65,551 |  |
| Leachable material grade | 0.608% | 0.163% | 0.214% | 0.148% | 0.185% |  | 0.385% | 0.199% |  |
| Total |  |  |  |  |  |  |  |  |  |
| Sulfide ore reserves(kt) | 1,848,240 | 2,355,219 | 2,479,876 | 2,977,241 | 9,660,576 | 41,499 |  | 1,805,132 | 6,058 |
| Average grade: |  |  |  |  |  |  |  |  |  |
| Copper | 0.494% | 0.541% | 0.583% | 0.251% | 0.453% | 0.529% |  | 0.445% | 1.510% |
| Molybdenum | 0.018% | 0.031% | 0.009% | 0.028% | 0.022% |  |  | 0.008% |  |
| Lead |  |  |  |  |  | 1.025% |  |  | 0.450% |
| Zinc |  |  |  |  |  | 3.077% |  |  | 2.566% |
| Leachable material (kt) | 7,904 | 1,728,722 | 3,450,420 | 631,253 | 5,818,299 |  | 678,728 | 229,472 |  |
| Leachable material grade | 0.629% | 0.184% | 0.232% | 0.151% | 0.209% |  | 0.372% | 0.322% |  |
| Waste (kt) | 4,848,462 | 9,446,400 | 4,862,604 | 1,832,910 | 20,990,376 |  | 615,955 | 1,385,747 |  |
| Total material (kt) | 6,704,606 | 13,530,341 | 10,792,900 | 5,441,404 | 36,469,251 | 41,499 | 1,294,683 | 3,420,351 | 6,058 |
| Stripping ratio ((W+L)/O) | 2.63 | 4.74 | 3.35 | 0.83 | 2.78 |  |  | 0.89 |  |
| Stripping ratio (W/(L+O)) | 2.61 | 2.31 | 0.82 | 0.51 | 1.36 |  | 0.91 | 0.68 |  |
| **Leachable material** |  |  |  |  |  |  |  |  |  |
| Reserves in stock (kt) | 20,403 | 1,291,638 | 956,610 | 693,743 | 2,962,394 |  |  |  |  |
| Average copper grade | 0.488% | 0.153% | 0.139% | 0.243% | 0.172% |  |  |  |  |
| In-pit reserves: |  |  |  |  |  |  |  |  |  |
| Proven (kt) | 1,986 | 795,473 | 2,665,667 | 485,648 | 3,948,774 |  | 200,819 | 163,921 |  |
| Average copper grade | 0.693% | 0.208% | 0.237% | 0.152% | 0.221% |  | 0.341% | 0.371% |  |
| Probable(kt) | 5,918 | 933,249 | 784,753 | 145,605 | 1,869,525 |  | 477,909 | 65,551 |  |
| Average copper grade | 0.608% | 0.163% | 0.214% | 0.148% | 0.185% |  | 0.385% | 0.199% |  |
| Total leachable reserves | 28,307 | 3,020,360 | 4,407,030 | 1,324,996 | 8,780,693 |  | 678,728 | 229,472 |  |
| Average copper grade | 0.527% | 0.171% | 0.212% | 0.199% | 0.197% |  | 0.372% | 0.322% |  |
| **Copper contained in ore reserves (kt) (2)** | 9,180 | 15,923 | 22,463 | 8,426 | 55,992 | 220 | 2,525 | 8,772 | 91 |

(kt) = Thousand tons

(1) W= Waste, L= Leachable material; O= Ore.

(2) The IMMSA unit includes the Charcas, Santa Barbara, San Martin, Santa Eulalia and Taxco mines. Zinc and lead contained in ore reserves are as follows:

| (in thousand tons) | Proven | Probable | Total |
| --- | ---: | ---: | ---: |
| Zinc | 485.0 | 791.9 | 1,276.9 |
| Lead | 193.0 | 232.5 | 425.5 |

(3) Copper contained in ore reserves for open-pit mines is (i) the product of sulfide ore reserves and the average copper grade plus (ii) the product of in-pit leachable reserves and the average grade of copper. Copper contained in ore reserves for underground mines is the product of sulfide ore reserves and the average copper grade.

OVERVIEW OF BLOCK MODEL RECONCILIATION PROCESS

We apply the following block model to mill reconciliation procedure.

The following stages are identified at the Cuajone, Toquepala, Buenavista and La Caridad mines:

1\. The mine geologists gather the necessary monthly statistical data from our information system (“SRP”), which provides ore tons milled and ore grades in the concentrator.

2\. Mined areas are topographically determined and related boundaries are built.

3\. Using the “interactive planner” option in our mining software (MineSight), ore tons and grades are calculated inside mined areas over the block model. At this point the current cut-off grade is considered.

4\. In the final stage, accumulated tons mined, weighted average grade for ore material and leach is compared to data coming from our SRP system.

Tonnage and grade reconciliation for 2013 are as follows:

| Mine | Long Range Model Tons (thousands) | % Copper | Mill Tons (thousands) | % Copper | Variance Tons (thousands) | % Copper |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Cuajone | 29,097 | 0.660 | 29,269 | 0.669 | (172) | (0.009) |
| Toquepala | 20,599 | 0.567 | 19,954 | 0.611 | 645 | (0.044) |
| Buenavista | 25,233 | 0.537 | 25,260 | 0.559 | (27) | (0.022) |
| La Caridad | 33,305 | 0.340 | 33,570 | 0.344 | (265) | (0.004) |

If the estimation error appears greater than 3%, a detailed evaluation is done to review the differences, which normally could result in more in-fill drilling, in order to better understand the geological characteristics (grade, rock type, mineralization and alteration) and the spacing of drill holes which are considered in the ore body zone.

AVERAGE DRILL-HOLE SPACING

The following is the average drill-hole spacing for proven and probable sulfide reserves as of December 31, 2013:

|  | Proven (average spacing in meters) | Probable |
| --- | ---: | ---: |
| Cuajone | 77.24 | 119.68 |
| Toquepala | 78.32 | 116.31 |
| Buenavista | 53.10 | 106.24 |
| La Caridad | 46.52 | 104.71 |

## Legal proceedings

As filed, 156 characters.

Reference is made to the information under the caption “Litigation Matters” in the consolidated financial statement Note 13 “Commitments and contingencies.”

## Management's discussion and analysis

As filed, 97,128 characters.

EXECUTIVE SUMMARY

*This Management’s Discussion and Analysis of Financial Condition and Results of Operations relates to and should be read together with our Audited Consolidated Financial Statements as of and for each of the years in the three-year period ended December 31, 2013. Therefore, unless otherwise noted, the discussion below of our financial condition and results of operations is for Southern Copper Corporation and its subsidiaries (collectively, “SCC,” the” Company,” “our,” and “we”) on a consolidated basis for all periods. Our financial results may not be indicative of our future results.*

*This discussion contains forward-looking statements that are based on management’s current expectations, estimates and projections about our business and operations. Our actual results may differ materially from those currently anticipated and expressed in the forward-looking statements as a result of a number of factors. See Item 1 “Business” - “Cautionary Statement.”*

EXECUTIVE OVERVIEW

**Business:** Our business is primarily the production and sale of copper. In the process of producing copper, a number of valuable metallurgical by-products are recovered, which we also produce and sell. Market forces outside of our control largely determine the sale prices for our products. Our management, therefore, focuses on value creation through copper production, cost control, production enhancement and maintaining a prudent capital structure to remain profitable. We endeavor to achieve these goals through capital spending programs, exploration efforts and cost reduction programs. Our aim is to remain profitable during periods of low copper prices and to maximize financial performance in periods of high copper prices.

We are one of the world’s largest copper mining companies in terms of production and sales with our principal operations in Peru and Mexico. We also have an active ongoing exploration program in Chile and in 2011 we started exploration activities in Argentina and Ecuador. In addition to copper we produce significant amounts of other metals, either as a by-product of the copper process or in a number of dedicated mining facilities in Mexico.

In 2013, we invested $1,703.3 million in capital programs along with $51 million in our exploration efforts. We believe this commitment to growth will continue to benefit our Company, our investors, our neighboring communities, and the countries in which we operate.

We believe we hold the world’s largest copper reserve position. Our copper ore reserves, at December 31, 2013, totaled 67.6 million tons of contained copper, calculated at a copper price of $2.00 per pound (as of December 31, 2013, the LME and COMEX copper price was $3.35 and $3.44, respectively), as follows:

| Copper contained in ore reserves | Thousand tons |
| --- | ---: |
| Mexican open-pit | 30,889 |
| Peruvian operations | 25,103 |
| IMMSA | 220 |
| Development projects | 11,388 |
| **Total** | **67,600** |

**Outlook:** Various key factors will affect our outcome. These include, but are not limited to, some of the following:

- Changes in copper and molybdenum prices: In 2013, the average LME copper price was $3.32 per pound and the average COMEX copper price was $3.34 per pound, about 8% and 7.5% lower than in 2012, respectively. Average silver, molybdenum and zinc prices in 2013 decreased, 23.6%, 18.7% and 1.1%, respectively, compared to 2012. In 2013, per pound LME spot copper prices ranged from $3.01 to $3.74.
- Sales structure: In the last three years approximately 77.3% of our revenues came from the sale of copper, 7.1% from molybdenum, 7.1% from silver, 3.1% from zinc and 5.4% from various other products, including sulfuric acid, gold and other materials.
- Metal markets: We are cautiously optimistic about the current economic scenario. The International Monetary Fund has consistently increased its 2014 growth forecast for the world economy, expecting a 3.7% increase in global GDP growth for 2014 and 3.9% for 2015. A driver for the world economy is the synchronized growth expected for the United States, Europe and Japan, which together represent about 54% of the world GDP. These three economies consume directly about 31% of the world’s refined copper production and are an important driver of indirect demand.

Copper: During 2013, we have seen the strong fundamentals of this market coming back again to support copper prices. As of December 31, 2013, inventories at the three major warehouses (LME, COMEX and Shanghai) have decreased by 427,300 tons or 45% since their peak in June of last year. This decreasing trend has continued during 2014, with inventories of refined copper at January 31, 2014, 6% lower than 2013´s close.

We expect that the sustained recovery of the major economies, in conjunction with the year-to-year increase in Chinese copper imports of 6.5%, will reduce the chance of an oversupply, particularly of refined copper, our main product, in 2014.

On the supply side, despite some evidence of a possible market oversupply for the coming year, we think that several structural factors, such as labor stoppages, excessive taxation or governmental intervention, technical problems, scrap shortages and other issues are affecting and will continue to affect copper supply, offsetting the net impact of additional production coming from new projects and expansions.

We believe that we are well positioned to take advantage of the strong fundamentals of the copper market. We believe that our aggressive investment program of organic growth, aimed at increasing production from current capacity to approximately 1.2 million tons by 2017 will lead to further benefits in the coming years.

Silver: Represented 6.6% of our sales in 2013 and it is with molybdenum our most significant by-product. Silver prices averaged $23.82 per ounce in 2013, 23.6% lower than its 2012 price. We believe that silver prices will have strong support due to its industrial uses as well as being perceived as a value shelter in times of economic uncertainty.

Molybdenum: Represented 6.6% of our sales in 2013. In last quarter of 2013 we saw stable molybdenum demand. Regarding the supply, we are expecting a 10% worldwide growth coming from our Buenavista operation as well as Sierra Gorda, Toromocho and Caserones, among other projects.

Even though the current scenario for molybdenum prices is not positive, it is important to note that about 50% of the supply of this metal comes from primary or dedicated molybdenum mines, which have a cash cost in the range of $9-$12 per pound. This creates a natural barrier for the molybdenum market to adjust production volume and thereby protect low cost secondary molybdenum producers such our Company.

Zinc: Represented 3.4% of our sales in 2013. We also believe that zinc has very good long term fundamentals due to its significant industrial consumption and expected mine production shutdowns. In the last 12 months, zinc inventories have decreased by 30%, improving this markets fundamentals. We are expecting an increasing price scenario for zinc in the next few years.

- Production: For 2014, we are expecting to produce 672,400 tons of copper from our mines. We don’t expect to process third party copper concentrates in 2014. As we have reported, we expect that the new SX-EW III plant at Buenavista will start operations during the second quarter of 2014 and produce 53,400 tons during 2014.

We expect to produce 21,500 tons of molybdenum in 2014, 7.6% more than our 2013 production and a new Company record. This production forecast includes 1,980 tons from our molybdenum plant at Buenavista.

We also expect to produce and sell 16.3 million ounces of silver and produce 95,200 tons of zinc in 2014.

- Cost: Our operating costs and expenses for the three-year period 2011 to 2013 have generally increased in each of the years. Our comparison of costs for the three year period is as follows:

|  | 2013 | 2012(\*) | 2011 |
| --- | ---: | ---: | ---: |
| Operating costs and expenses (in millions) | $3,421 | $3,244 | $3,193 |
| Percentage increase from prior year | 5.5% | 1.6% |  |

(\*) Operating costs and expenses for 2012 does not include a one-time expense of $316.2 million, for legal fees related to a shareholder derivative lawsuit. According, operating costs and expenses for 2012 is a non-GAAP measure, please see subheading “Non-GAAP information reconciliation”, for a reconciliation of this to a GAAP measure, in this Item 7.

Operating costs and expenses increased in the three-year period due to higher depreciation, caused by the completion and placing in service of some capital assets for both our Buenavista expansion program and our maintenance programs. Cost of sales increases, during the period, were largely caused by the higher cost of fuel, power and labor. The sharp decrease in the purchase and sale of third-party metal concentrates in the 2013 and 2012 years, helped reduce cost of sales.

- Capital Expenditures: Capital expenditures reached a new record of $1,703.3 million for 2013, 105.2% of net income and 61.9% higher than in 2012. Our growth program to develop the full production potential of our Company is in full steam.

For 2014, we plan to invest $2.3 billion in capital projects, an increase of $600 million compared to 2013 and 142% of last year’s net income. As we have previously reported, our investment program aims to increase copper production capacity approximately 87% by 2017.

- World Finance recognition. In November 2013, World Finance, an international business magazine, recognized our 2012 $1.5 billion fixed-rate senior unsecured notes as the best international debt issue of the year in the mining industry. The notes were issued in two tranches, $300 million due in 2022 at an annual interest rate of 3.5% and $1.2 billion due in 2042 at an annual interest rate of 5.25%. At the time, these interest rates were the lowest obtained by any BBB rated Latin-American debt issue with maturities of 10 and 30 years.
- Mexican tax changes; In December 2013, the Mexican Congress enacted tax law changes that became effective on January 1, 2014. Among other things the new law establishes:

1\) A 7.5% mining royalty on taxable EBITDA. Assuming a copper price of $3.50 per pound, this royalty charge would have an estimated net after-tax cost of $53 million, in 2014.

2\) An additional royalty of 0.5% on the net sales value of gold, silver and platinum. We do not expect this royalty charge to have a significant impact on our results.

3\) A change in the method used to determine water rights which will increase water cost by approximately $20 million per year,

4\) A new environmental tax on the sale and importation of fossil fuels that would have an annual estimated cost of approximately $6 million.

5\) The law eliminates certain benefits of tax consolidation rules, and

6\) The law maintains the statutory income tax rate at 30%, thereby eliminating the scheduled reductions for 2014 and 2015.

Related to these changes we recognized a deferred income tax charge of $34.7 million.

KEY MATTERS

We discuss below several matters that we believe are important to understand our results of operations and financial condition. These matters include (i) earnings, (ii) production, (iii) “operating cash costs” as a measure of our performance, (iv) metal prices, (v) business segments, (vi) the effect of inflation and other local currency issues, and (vii) our capital investment and exploration program.

**Earnings:** The table below highlights key financial and operational data of our Company for the three years ended December 31, 2013 (in millions, except per share amounts):

|  | Year 2013 | 2012 | 2011 | Variance 2013-2012 | 2012-2011 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Net sales | $5,953 | $6,669 | $6,819 | $(716) | $(150) |
| Operating income | 2,532 | 3,109 | 3,625 | (577) | (516) |
| Net income attributable to SCC | $1,618 | $1,935 | $2,336 | $(317) | $(401) |
| Earnings per share | $1.92 | $2.28 | $2.73 | $(0.36) | $(0.45) |
| Dividends per share | $0.68 | $4.06 | $2.43 | $(3.38) | $1.63 |
| Pounds of copper sold | 1,382 | 1,415 | 1,320 | (33) | 95 |

Net sales decreased in the three-year period from 2011 to 2013, due to lower metal prices for copper and our principal by-products. Improved sales volumes for some of our products helped reduce the impact of the price decreases. The 2013 molybdenum sales volume increased by 9.4% and includes a new record of 25.9 million pounds at our La Caridad mine and 0.8 million pounds from the first production of the new molybdenum plant at Buenavista.

The two largest components of operating costs and expenses are cost of sales and depreciation, amortization and depletion, which increased in each of the years in the periods above. Cost of sales and depreciation, amortization and depletion increased by a little over $100 million and $70 million, respectively, in 2013. The increase in cost of sales was due to cost inflation of fuel, explosives, tires and reagents, as well as increases in labor cost, mainly at the Peruvian operations due to the new collective bargaining agreements, signed in early 2013. The increase in depreciation was mainly due to the start-up of the Quebalix III and the first molybdenum plant at Buenavista, as well as maintenance capital acquisitions at most of our operations. The 2012 operating cost, however, includes a charge of $316.2 million for legal fees related to our shareholders derivative lawsuit. This unique charge affects 2012 with no equivalent charge in the other years.

Finally, net income in 2013 was 16.3% lower mainly due to the above factors.

**Production**: The table below highlights, mine production data of our Company for the three years ended December 31, 2013:

|  | Year 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Copper (in million pounds) | 1,360 | 1,406 | 1,295 |
| Molybdenum (in million pounds) | 44 | 40 | 41 |
| Zinc (in million pounds) | 219 | 198 | 185 |
| Silver (in million ounces) | 13 | 14 | 13 |

The tables below highlights copper production data at each of our mines for the three years ended December 31, 2013:

| Copper (in million pounds): | 2013 | 2012 | 2011 | Variance 2013-2012 Volume% |  | 2012-2011 Volume% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Toquepala | 306.6 | 335.8 | 343.3 | (29.2) | (8.7)% | (7.5) | (2.2)% |
| Cuajone | 371.7 | 350.1 | 309.0 | 21.6 | 6.2% | 41.1 | 13.3% |
| La Caridad | 266.2 | 266.0 | 250.5 | 0.2 | 0.1% | 15.5 | 6.2% |
| Buenavista | 401.7 | 441.1 | 380.3 | (39.4) | (8.9)% | 60.8 | 16.0% |
| IMMSA | 14.1 | 12.9 | 12.2 | 1.2 | 9.3% | 0.7 | 5.7% |
| Total mined copper | 1,360.3 | 1,405.9 | 1,295.3 | (45.6) | (3.2)% | 110.6 | 8.5% |

#### 2013 compared to 2012:

Mined copper in 2013 decreased 45.6 million pounds, compared to 2012 production. This decrease was due to:

- Lower production at our Buenavista mine, which experienced temporary flooding problems,
- lower production at the Toquepala mine due to lower ore grades and throughput at the concentrator, and
- lower SX-EW production because of a decrease in PLS grades. Partially offset by,
- higher production at the Cuajone mine resulting from higher ore grades and recoveries.

Molybdenum production increased 3.5 million pounds in 2013, compared to 2012. Molybdenum production increased in all our mines. La Caridad mine reached a new record production of 25.9 million pounds in 2013 compared to the prior year record of 24.2 million pounds. Additionally, the new Buenavista molybdenum plant which started commercial production by the end of the third quarter 2013, produced 0.8 million pounds of molybdenum.

Zinc mine production from our IMMSA unit in Mexico, increased by 20.9 million pounds in 2013, 10.6% higher than in 2012, mainly as a result of higher recoveries and a full year of production at the Santa Eulalia mine after the flooding problems of prior years were resolved.

Our silver production decreased slightly in 2013, compared to 2012 production, due to lower production at the Toquepala, Buenavista and La Caridad mines offset somewhat by higher production at the Cuajone and IMMSA mines.

#### 2012 compared to 2011:

Mined copper in 2012 increased 110.6 million pounds, compared to 2011 production. This increase was due to higher production at our Mexican mines and includes an additional 60.8 million pounds at the Buenavista mine, which had record production in 2012, 15.5 million pounds at the La Caridad mine, and 41.1 million pounds of higher production at the Cuajone mine. These increases in production were the result of higher ore grades and recoveries, and were partially offset by lower production at the Toquepala mine, whose production decreased by 2.2% mainly due to lower PLS copper grade and volume processed at the SX-EW plant.

Molybdenum production decreased slightly in 2012, compared to 2011, due primarily to 2.0 million pounds of lower production at the Toquepala mine, as a result of lower ore grades and recoveries, offset by 1.2 million pounds and 0.2 million pounds of higher production at La Caridad mine and Cuajone mine, respectively.

Zinc mine production, which comes from our IMMSA unit in Mexico, increased by 13.4 million pounds in 2012, 7.3% higher than in 2011, mainly as a result of higher recoveries and the production recovery at the Santa Eulalia mine after the flooding problems of prior years were resolved.

Our silver production increased 7.2% in 2012, principally due to higher production at the Buenavista mine and the Cuajone mine, offset somewhat by lower production at some of our other mines.

**Operating Cash Costs:** An overall benchmark used by us and a common industry metric to measure performance is operating cash costs per pound of copper produced. Operating cash cost is a non-GAAP measure that does not have a standardized meaning and may not be comparable to similarly titled measures provided by other companies. This non-GAAP information should not be considered in isolation or as substitute for measures of performance determined in accordance with GAAP. A reconciliation of our operating cash cost per pound to the cost of sales (exclusive of depreciation, amortization and depletion) as presented in the consolidated statement of earnings is presented under the subheading, “Non-GAAP Information Reconciliation,” on page 101. We disclose operating cash cost per pound of copper produced, both without and with the inclusion of by-product revenues.

We define ***operating cash cost per pound of copper produced without by-product revenues*** as cost of sales (exclusive of depreciation, amortization and depletion), plus selling, general and administrative charges, treatment and refining charges net of sales premiums; less the cost of purchased concentrates, workers’ participation and other miscellaneous charges, including royalty charges, and the change in inventory levels; divided by total pounds of copper produced by our own mines.

In our calculation of operating cash cost per pound of copper produced, we exclude depreciation, amortization and depletion, which are considered non-cash expenses. Exploration is considered a discretionary expenditure and is also excluded. Workers’ participation provisions are determined on the basis of pre-tax earnings and are also excluded. Additionally excluded from operating cash costs are items of a non-recurring nature and the mining royalty charge as it is based on various calculations of taxable income, depending on which jurisdiction, Peru or Mexico, is imposing the charge. We believe these adjustments will allow our management and stakeholders to see a presentation of our controllable cash cost, which we consider is one of the lowest of copper producing companies of similar size.

We define ***operating cash cost per pound of copper produced with by-product revenues*** as operating cash cost per pound of copper produced, as defined above, less by-product revenues and net revenue (loss) on sale of metals purchased from third parties.

In our calculation of operating cash cost per pound of copper produced, with by-product revenues, we credit against our costs the revenues from the sale of all our by-products, including, molybdenum, zinc, silver, gold, etc. and the net revenue (loss) on sale of metals purchased from third parties. We disclose this measure including the by-product revenues in this way because we consider our principal business to be the production and sale of copper. As part of our copper production process, much of our by-products are recovered. These by-products, as well as the process of copper purchased from third parties, are a marginal part of our production process and their sales value contribute to cover part of our incurred fixed costs. We believe that our Company is viewed by the investment community as a copper company, and is valued, in large part, by the investment community’s view of the copper market and our ability to produce copper at a reasonable cost.

We believe that both of these measures are useful tools for our management and our stakeholders. Our cash costs, without by-product revenues allows us to monitor our cost structure and address with operating management areas of concern as copper is our main source of revenues.

The measure operating cash cost per pound of copper with by-product revenues is a common measure used in the copper industry and is a useful management tool that allow us to track our performance and better allocate our resources. This measure is also used in our investment project evaluation process to determine a project’s potential contribution to our operations, its competitiveness and its relative strength in different price scenarios. The expected contribution of by-products is generally a significant factor used by the copper industry in determining whether to move forward with the development of a new mining project. As the price of our by-product commodities can have significant fluctuations from period to period, the value of its contribution to our costs can be volatile.

Our operating cash cost per pound of copper produced, as defined above, is presented in the table below for the three years ended December 31, 2013:

### Operating cash cost per pound of copper produced(1)

### (In millions, except cost per pound and percentages)

|  | 2013 | 2012 | 2011 | Variance 2013-2012 Value% |  | 2012-2011 Value% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Total operating cash cost without by-product revenues | $2,565.3 | $2,382.8 | $2,139.4 | $182.5 | 7.7% | $243.4 | 11.4% |
| Total by-product revenues | (1,231.4) | (1,429.3) | (1,501.9) | (197.9) | (13.8)% | (72.6) | (4.8)% |
| Total operating cash cost with by-product revenues | $1,333.9 | $953.5 | $637.5 | $380.4 | 39.9% | $316.0 | 49.6% |
| Total pounds of copper produced | 1,338.8 | 1,377.4 | 1,259.5 | (38.6) | (2.8)% | 117.9 | 9.4% |
| Operating cash cost per pound without by-product revenues | $1.92 | $1.73 | $1.70 | $0.19 | 11.0% | $0.03 | 1.8% |
| Operating cash cost per pound with by-product revenues | $1.00 | $0.69 | $0.51 | $0.31 | 44.9% | $0.18 | 35.3% |

(1) These are non-GAAP measures, see page 101 for reconciliation to GAAP measure.

#### 2013 compared to 2012:

As seen on the chart above, operating cash cost per pound of copper without by-product revenues was $0.19 per pound higher than in 2012, an increase of 11.0%, due to higher production cost. Production cost increases were primarily, from Peruvian labor cost, as a result of the new collective bargaining agreements, and higher fuel and power costs. In addition, there were increases in some of the other operating material we use in our operations, including tires, explosives and reagents.

Our cash cost per pound for 2013 when calculated with by-product revenues was $1.00 per pound, compared to $0.69 per pound in 2012. In addition to the increase in production cost, lower sales prices of our main by-products reduced the positive contribution of by-product revenues.

#### 2012 compared to 2011:

Operating cash cost per pound of copper without by-product revenues was $0.03 per pound higher than in 2011, an increase of 1.8%, mainly due to increases in fuel and power cost, partially offset by the lowering effect on unit cost from higher production.

Our cash cost per pound for 2012 when calculated with by-product revenues was $0.69 per pound, compared to $0.51 per pound in 2011. The increase was largely as result of lower prices for our major by-products, which decreased in a range from 11% to 18% in the period.

**Metal Prices:** The profitability of our operations is dependent on, and our financial performance is significantly affected by, the international market prices for the products we produce, especially for copper, molybdenum, zinc and silver. Metal prices historically have been subject to wide fluctuations and are affected by numerous factors beyond our control. These factors, which affect each commodity to varying degrees, include international economic and political conditions, levels of supply and demand, the availability and cost of substitutes, inventory levels maintained by producers and others and, to a lesser degree, inventory carrying costs and currency exchange rates. In addition, the market prices of certain metals have on occasion been subject to rapid short-term changes due to economic concerns and financial investments.

We are subject to market risks arising from the volatility of copper and other metals prices. For 2014, assuming that expected metal production and sales are achieved, that tax rates are unchanged and giving no effect to potential hedging programs, metal price sensitivity factors would indicate the following change in estimated annual net income attributable to SCC resulting from metal price changes:

|  | Copper | Molybdenum | Zinc | Silver |
| --- | ---: | ---: | ---: | ---: |
| Change in metal prices (per pound except silver — per ounce) | $0.01 | $1.00 | $0.01 | $1.00 |
| Change in net earnings (in millions) | $8.7 | $28.0 | $1.3 | $9.6 |

**Business Segments:** We view our Company as having three operating segments and manage it on the basis of these segments. These segments are (1) our Peruvian operations, (2) our Mexican open-pit operations and (3) our Mexican underground operations, known as our IMMSA unit. Our Peruvian operations include the Toquepala and Cuajone mine complexes and the smelting and refining plants, industrial railroad and port facilities that service both mines. The Peruvian operations produce copper, with significant by-product production of molybdenum, silver and other material. Our Mexican open-pit operations include La Caridad and Buenavista mine complexes, the smelting and refining plants and support facilities, that service both mines. The Mexican open-pit operations produce copper, with significant by-product production of molybdenum, silver and other material. Our IMMSA unit includes five underground mines that produce zinc, lead, copper, silver and gold, a coal mine which produces coal and coke, and several industrial processing facilities for zinc, copper and silver.

Segment information is included in our review of “Results of Operations” in this item and also in Note 19 “Segment and Related Information” of our consolidated financial statements.

**Inflation and Exchange Rate Effect of the Peruvian Nuevo Sol and the Mexican Peso:** Our functional currency is the U.S. dollar and our revenues are primarily denominated in U.S. dollars. Significant portions of our operating costs are denominated in Peruvian Nuevo sol and Mexican pesos. Accordingly, when inflation and currency devaluation/appreciation of the Peruvian currency and Mexican currency occur our operating results can be affected. In recent years we do believe such changes have not had a material effect on our results and financial position. Please see Item 7A. “Quantitative and Qualitative Disclosures about Market Risk” for more detailed information.

**Capital Investment Program:** We made capital expenditures of $1,703.3 million, $1,051.9 million and $612.9 million in 2013, 2012 and 2011, respectively. In general, the capital expenditures and investment projects described below are intended to increase production, decrease costs or address social and environmental commitments.

The table below sets forth our capital expenditures for the three years ended December 31, 2013 (in millions):

| Peruvian projects: | 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Tia Maria — Arequipa | $41.1 | $7.8 | $1.6 |
| Toquepala projects | 56.7 | 32.7 | 76.0 |
| Cuajone mine south area slope stability program | 59.4 | — | — |
| Cuajone projects | 9.6 | 52.0 | 38.9 |
| Tailings disposal — Quebrada Honda dam | 0.9 | 1.3 | 0.7 |
| Ilo three power sub-station | 5.9 | 11.9 | 9.8 |
| Sub-total projects | 173.6 | 105.7 | 127.0 |
| Maintenance and replacement | 198.7 | 152.2 | 78.5 |
| Total Peruvian expenditures | 372.3 | 257.9 | 205.5 |

| Mexican projects: |  |  |  |
| --- | ---: | ---: | ---: |
| Buenavista mine expansion | 167.9 | 216.3 | 97.4 |
| New Buenavista concentrator | 388.3 | 149.0 | 7.7 |
| Buenavista projects infrastructure | 39.0 | 69.1 | 9.0 |
| Buenavista SX-EW plant III | 226.7 | 138.3 | 6.5 |
| Buenavista crusher and conveyors system for leach material, (Quebalix III) | 8.1 | 16.1 | 13.6 |
| Quebalix IV | 54.0 | — | — |
| Buenavista molybdenum plant | 19.0 | 17.0 | 1.2 |
| Buenavista mine and facilities rehabilitation |  | — | 96.7 |
| El Arco feasibility study, land and water rights | 1.3 | 1.5 | 9.4 |
| La Caridad Flash furnace and acid plant modernization | 39.5 | 5.9 | 1.7 |
| Santa Eulalia pumping system | 1.8 | 4.9 | 9.6 |
| Angangueo project | 9.0 | 3.6 | 6.5 |
| Sub-total projects | 954.6 | 621.7 | 259.3 |
| Maintenance and replacement | 376.4 | 172.3 | 148.1 |
| Total Mexican expenditures | 1,331.0 | 794.0 | 407.4 |
| **Total capital expenditures** | **$1,703.3** | **$1,051.9** | **$612.9** |

Capital expenditures were a record in 2013, 61.9% higher than in 2012. The increase reflects our strong commitment to the growth program to develop the full production potential of our Company. In 2014, we plan to invest $2.3 billion in capital projects. As we previously disclosed our investment program aims to increase copper production capacity approximately 87% by 2017, from 630,000 tons to 1,175,000 tons. In addition to our ongoing capital maintenance and replacement spending, our principle capital programs include the following:

### Projects in Mexico

Buenavista Projects: We continue developing our $3.4 billion investment program at this unit, which is expected to increase its copper production capacity by approximately 171%, from 180,000 tons to 488,000 tons by 2015, as well as, to increase molybdenum production. As part of the expansion program at this unit, we expect to start copper production at our 120,000 ton capacity SX-EW III plant in the second quarter of 2014 and to have a full year production at our molybdenum plant.

The *new concentrator with molybdenum circuit* project includes a concentrator with an estimated annual production capacity of 188,000 tons of copper and a second molybdenum plant with a 2,600 ton capacity. In addition, the project is expected to produce annually 2.3 million ounces of silver and 21,000 ounces of gold. The total capital budget of the project is $1,383.6 million and through December 31, 2013 it has a 62.9% progress with an investment of $544.9 million. The project is expected to be completed in the first half of 2015. Four of the six ball mills acquired for the project have been installed; we are currently in the process of installing the remaining two.

Regarding the *mine equipment acquisition*, through December 31, 2013 we have spent $481.7 million from a total budget of $504.8 million and have received 60 of 61 trucks, the seven shovels and the eight drills required.

The *SX-EW III* project is moving forward to completion with an overall progress of 81.6% at December 31, 2013. The total capital budget of the project is $444.0 million of which we have spent $373.6 million through December 31, 2013. The project production capacity is 120,000 tons of copper cathodes per year and it is expected to start operating in the second quarter of 2014.

*Quebalix IV* change in scope. As previously reported, this project will improve the SX-EW copper production by increasing recovery and reducing hauling cost, as well as processing time. Recently, we have reassessed the project’s crushing capacity and found that by increasing it from 40 to 80 million tons per year, it could eliminate the need for an additional Quebalix facility in the future and operate at a lower unit cost. On January 30, 2014, our Board of Directors approved the described change in scope, increasing the total capital budget of the project by $100 million, to $340 million. The project is expected to be completed in the first half of 2015.

The remaining projects to complete the $3.4 billion budgeted program include investments in infrastructure, land acquisition and other facilities at Buenavista.

Angangueo: The project is moving forward as scheduled to develop this underground polymetallic deposit in Michoacan, Mexico. With an estimated investment of $174.7 million, Angangueo includes a concentrator plant which will have an estimated average annual metal content production of 10,400 tons of copper and 7,000 tons of zinc in the first seven years. Over the life of the mine, average annual concentrate production is expected to contain 2.4 million ounces of silver and 1,500 ounces of gold. The project is scheduled to begin production in the first half of 2015. Through December 31, 2013 we have spent $19.0 million on the project and in 2014 we expect to begin the acquisition of the principal equipment and to start the selection process for the construction contractors.

### Projects in Peru

Tia Maria Project: In the fourth quarter we successfully held the two workshops and the public hearing required as part of the approval process for the new EIA of the project. We expect to receive approval of the EIA as well as construction permits by the end of the second quarter 2014. Considering this time line, the Tia Maria project is expected to start-up production late in 2016. The project capacity is 120,000 tons of copper per year.

Toquepala Projects: Through December 31, 2013, we have spent a total $288.5 million on Toquepala projects. These projects include the construction of a new in-pit crusher and conveyor belt system at a cost of $88.5 million to replace current mine rail haulage, which we expect will reduce annual operating cost by approximately $5.5 million.

Regarding Toquepala expansion, the project continues progressing favorably after having reached agreements with local communities. With an estimated cost of $1.0 billion, this project will increase annual production of Toquepala by 100,000 tons of copper and 3,100 tons of molybdenum.

Cuajone Projects: Through December 31, 2013, we have spent $146 million of a total budget of $157 million on two projects to increase productivity through technological improvements in this unit: (i) the Variable Cut-off Ore Grade project and (ii) the HPGR project.

A Cuajone production increment of 6.2% in 2013 shows the results of the variable cut-off ore grade project, which was completed in the first quarter 2013 at a cost of $112 million. The HPGR project, which will produce a more finely crushed material, is currently in the ramping up stage and we expect to reach full capacity during the first quarter 2014. The project will improve copper recovery and generate cost savings by reducing power consumption in the crushing process. The total project budget is $45 million of which we have spent $34 million as of December 31, 2013. We expect that both projects will be at full capacity by the first half 2014.

The project to improve slope stability at the south area of the Cuajone mine, will remove approximately 148 million tons of waste material in order to improve the mine design without reducing our actual production level. The mine equipment acquired includes one shovel, five trucks, one drill and auxiliary equipment. Besides preparing the mine for the future, this investment will avoid a reduction in average ore grade between 2014 and 2018, while maintaining current production levels. At December 31, 2013, we have spent $59.4 million of a total budget of $65.1 million.

Tailings disposal at Quebrada Honda: This project increases the height of the existing Quebrada Honda dam to impound future tailings from the Toquepala and Cuajone mills and will extend the expected life of this tailings facility by 25 years. The first stage and construction of the drainage system for the lateral dam are finished. We are preparing bidding documents for the second stage that includes engineering and procurement to improve and increase the dam’s embankment. The project has a total budgeted cost of $66.0 million with $49.9 million expended through December 31, 2013.

### Other potential projects

El Arco: El Arco is a world class copper deposit in the central part of the Baja California peninsula, with ore reserves over 1.5 billion tons with an ore grade of 0.416% and 0.14 grams of gold per ton. In 2010, we concluded the feasibility study and an investment of $56.4 million was approved for land acquisition required for the project. This project, when developed, is expected to produce 190,000 tons of copper and 105,000 ounces of gold annually. Through December 31, 2013 we have spent $40.9 million on studies, exploration and land acquisition for the project. In 2014, we expect to continue investing in land acquisition and exploration. In addition, we will begin an engineering study to determine the best way to optimize the investment in the project.

Exploration projects: We have a number of exploration projects that we may develop in the future. We are currently involved in active exploration activities in Peru, Mexico, Chile and, more recently, in Ecuador and Argentina. For more information regarding our exploration activities, please see “Exploration Activities” in part I, Item 1. Business.

We have a number of other projects that we may develop in the future. We evaluate new projects on the basis of our long-term corporate objectives, expected return on investment, environmental concerns, required investment and estimated production, among other considerations. All capital spending plans will continue to be reviewed and adjusted to respond to changes in the economy or market conditions.

We expect to meet the cash requirements for these projects from cash on hand, internally generated funds and from additional external financing, if required. All capital spending plans will continue to be reviewed and adjusted to respond to changes in the economy or market conditions.

The above information is based on estimates only. We cannot make any assurance that we will undertake any of these projects or that the information noted is accurate.

CRITICAL ACCOUNTING POLICIES AND ESTIMATES

Our significant accounting policies are discussed in Note 2 “Summary of Significant Accounting Policies”, of the Notes to Consolidated Financial Statements, included in Item 8 “Financial Statements and Supplementary Data” of this Annual Report.

Our discussion and analysis of financial condition and results of operations, as well as quantitative and qualitative disclosures about market risks, are based upon our consolidated financial statements, which have been prepared in accordance with U.S. GAAP. Preparation of these consolidated financial statements requires our management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosures of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. We make our best estimate of the ultimate outcome for these items based on historical trends and other information available when the financial statements are prepared. Changes in estimates are recognized in accordance with the accounting rules for the estimate, which is typically in the period when new information becomes available to management. Areas where the nature of the estimate makes it reasonably possible that actual results could materially differ from amounts estimated include: ore reserves, revenue recognition, estimated mine stripping ratios, leachable material and related amortization, the estimated useful lives of fixed assets, asset retirement obligations, litigation and contingencies, valuation allowances for deferred tax assets, tax positions, fair value of financial instruments, and inventory obsolescence. We base our estimates on historical experience and on various other assumptions that we believe to be reasonable under the circumstances. Actual results may differ from these estimates under different assumptions or conditions.

Ore Reserves: For internal ore reserve estimation, we use metal price assumptions of $2.00 per pound for copper and $12.00 per pound for molybdenum. These prices are intended to conservatively approximate average prices over the long term.

However, pursuant to SEC guidance, the reserve information in this report is calculated using average metals prices over the most recent three years, except as otherwise stated. We refer to these three-year average metals prices as “current average prices.” Our current average prices for copper are calculated using prices quoted by COMEX, and our current average prices for molybdenum are calculated using prices published in *Platt’s Metals Week.* Unless otherwise stated, reserves estimates in this report use the following average prices for copper and molybdenum as of December 31:

|  | 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Copper ($ per pound) | $3.65 | $3.68 | $3.26 |
| Molybdenum ($ per pound) | $12.74 | $14.52 | $13.95 |

Certain financial information is based on reserve estimates calculated on the basis of current average prices. These include amortization of intangible assets and mine development. Variations in ore reserve calculations from changes in metal price assumptions generally do not create material changes to our financial results. However, significant decreases in metal prices could adversely affect our earnings by causing, among other things, asset impairment charges, please see “Assets impairment” below. A 20% increase or decrease in three-year average copper prices, for mineral reserves estimation, which is a reasonable possibility, would not affect our statement of earnings as the amount of reserves will not change significantly. Please see Item 2- Properties - caption “Ore reserves.”

Long-term inventory - Leachable Material:

The leaching process is an integral part of the mining operations carried out at our open-pit mines. We capitalize the production cost of leachable material at our Toquepala, La Caridad and Buenavista mines recognizing it as inventory. The estimates of recoverable mineral content contained in the leaching dumps are supported by engineering studies. As the production cycle of the leaching process is significantly longer than the conventional process of concentrating, smelting and electrolytic refining, we include on our balance sheet, current leach inventory (as part of work-in-process inventories) and long-term leach inventory. The cost attributed to the produced leach material is charged to cost of sales generally over a five-year period (the average estimated recovery period based on the recovery percentages of each mine). However, a change in the five year-cycle generally would not have a material impact on our financial results as our production is largely from non-leach material.

Asset Retirement Obligation: Our mining and exploration activities are subject to various laws and regulations governing the protection of the environment. Accounting for reclamation and remediation obligations requires management to make estimates unique to each mining operation of the future costs we will incur to complete the reclamation and remediation work required to comply with existing laws and regulations. These estimates are based in part on our inflation and credit rate assumptions. Actual costs incurred in future periods could differ from amounts estimated. Additionally, future changes to environmental laws and regulations could increase the extent of reclamation and remediation work required to be performed by us. Any such increases in future costs could materially impact the amounts charged to operations for reclamation and remediation.

Asset retirement obligations are further discussed in Note 9 “Asset Retirement Obligation” to our consolidated financial statements included herein.

Revenue Recognition: For certain of our sales of copper and molybdenum products, customer contracts allow for pricing based on a month subsequent to shipping, in most cases within the following three months and in few cases perhaps a few further months. In such cases, revenue is recorded at a provisional price at the time of shipment. The provisionally priced copper sales are adjusted to reflect forward LME or COMEX copper prices at the end of each month until a final adjustment is made to the price of the shipments upon settlement with customers pursuant to the terms of the contract. In the case of molybdenum sales, for which there are no published forward prices, the provisionally priced sales are adjusted to reflect the market prices at the end of each month until a final adjustment is made to the price of the shipments upon settlement with customers pursuant to the terms of the contract. (See details in “Provisionally Priced Sales” under this Item 7).

Derivative Instruments: We utilize certain types of derivative financial instruments to enhance our ability to manage risks that exist as part of our ongoing business operations and to enhance our return on Company assets. Derivative contracts are reflected as assets or liabilities in the balance sheet at their fair value. The estimated fair value of the derivatives is based on market and/or dealer quotations and in certain cases valuation modeling. From time to time we have entered into copper and zinc swap contracts to protect a fixed copper and zinc price for portions of our metal sales, hedging contracts to fix fuel prices for a portion of our production costs, interest rate swap agreements to hedge the interest rate risk exposure on certain of our bank obligations with variable interest rates and currency swap arrangements to ensure Mexican peso/ U.S. dollar conversion rates. Realized and unrealized gains and losses related to economic hedges that do not qualify for hedge accounting are recognized in the consolidated statement of earnings as follows: copper and zinc derivatives are included in net sales, gain and losses related to fuel costs are included in cost of sales and all other are included in “Gain (loss) on derivative instruments.” Changes in the fair value of copper derivatives that are designated as cash flow hedges are deferred in accumulated other comprehensive income and are recognized in sales as the hedged copper sales occur.

Income Taxes: In preparing our consolidated financial statements, we recognize income taxes in each of the jurisdictions in which we operate. For each jurisdiction, we calculate the actual amount currently payable or receivable, as well as deferred tax assets and liabilities attributable to temporary differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases. Deferred income tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which these temporary differences are expected to be recovered or settled. The effect on deferred tax assets and liabilities of a change in rate is recognized through the income tax provision in the period that the change is enacted.

A valuation allowance is provided for those deferred tax assets for which it is more likely than not that the related benefits will not be realized. In determining the amount of the valuation allowance, we consider estimated future taxable income, as well as feasible tax planning strategies in each jurisdiction. If we determine that we will not realize all or a portion of our deferred tax assets, we will increase our valuation allowance with a charge to income tax expense. Conversely, if we determine that we will ultimately be able to realize all or a portion of the related benefits for which a valuation allowance has been provided, all or a portion of the related valuation allowance will be reduced with a credit to income tax expense.

Our Company’s operations involve dealing with uncertainties and judgments in the application of complex tax regulations in multiple jurisdictions. The final taxes paid are dependent upon many factors, including negotiations with taxing authorities in various jurisdictions and resolution of disputes arising from federal, state, and international tax audits. We recognize potential liabilities and record tax liabilities for anticipated tax audit issues in the U.S. and other tax jurisdictions based on our estimate of whether, and the extent to which, additional taxes will be due. We follow the guidance of ASC 740 “Income Taxes” to record these liabilities. (See Note 7 “Income Taxes” of the consolidated financial statements for additional information). We adjust these reserves in light of changing facts and circumstances; however, due to the complexity of some of these uncertainties, the ultimate resolution may result in a payment that is materially different from our current estimate of the tax liabilities. If our estimate of tax liabilities proves to be less than the ultimate assessment, an additional charge to expense would result. If payment of these amounts ultimately proves to be less than the recorded amounts, the reversal of the liabilities would result in tax benefits being recognized in the period when we determine the liabilities are no longer necessary. We recognize interest and penalties, if any, related to unrecognized tax benefits in income tax expense.

Asset Impairments: We evaluate our long-term assets when events or changes in economic circumstances indicate that the carrying amount of such assets may not be recoverable. Our evaluations are based on business plans that are prepared using a time horizon that is reflective of our expectations of metal prices over our business cycle. We are currently using a long-term average copper price of $3.00 per pound of copper and an average molybdenum price of $10.00 per pound, reflective of the current price environment, for our impairment tests. The results of our impairment sensitivity analysis, which included a stress test using a copper price assumption of $2.00 per pound and a molybdenum price assumption of $8.00 per pound showed projected discounted cash flows in excess of the carrying amounts of long-lived assets by margins ranging from 2.76 to 7.10 times such carrying amount.

In recent years our assumptions for long-term average prices resulted in stricter evaluations for impairment analysis than using the three year average prices for copper and molybdenum prices. Should this situation reverse in the future with three year average prices below the long-term price assumption, we would assess the need to use the three year average prices in our evaluations. We use an estimate of the future undiscounted net cash flows of the related asset or asset group over the remaining life to measure whether the assets are recoverable and measure any impairment by reference to fair value.

IMPACT OF NEW ACCOUNTING STANDARDS

In 2013 the Financial Accounting Standards Board (FASB) issued the following Accounting Standard Updates (“ASU”) to the FASB Accounting Standards Codification (the “ASC”).

ASU No. 2013-04: On February 28, 2013, the FASB issued ASU No. 2013-04 “Liabilities (Topic 405): Obligations Resulting from Joint and Several Liability Arrangements for which the Total Amount of the Obligation is Fixed at the Reporting Date.” The objective of this update is to provide guidance for the recognition, measurement, and disclosure of obligations resulting from joint and several liability arrangements for which the total amount of the obligation within the scope of this guidance (e.g. debt arrangements, other contractual obligations, and settled litigation and judicial rulings) is fixed at the reporting date, except for obligations addressed within existing guidance in U.S. GAAP.

The amendments require all entities to measure obligations resulting from joint and several liability arrangements for which the total amount of the obligation within the scope of this guidance is fixed at the reporting date, as the sum of the following:

- The amount the reporting entity agreed to pay on the basis of its arrangement among its co-obligors, and
- Any additional amount the reporting entity expects to pay on behalf of its co-obligors.

It is also required that an entity discloses the nature and amount of the obligation as well as other information about those obligations.

These changes will be effective for fiscal years, and interim periods within those years, beginning after December 15, 2013 with early adoption permitted. The Company will apply this guidance in any future arrangement.

ASU No. 2013-05: In March 2013, the FASB issued ASU 2013-05 an update of Foreign Currency Matters (Topic 830) to clarify the treatment of cumulative translation adjustments when a parent either sells a part or all of its investment in a foreign entity or no longer holds a controlling financial interest in a subsidiary or group of assets that is a business within a foreign entity. The updated guidance resolve the diversity in practice for the treatment of business combinations achieved in stages in a foreign entity.

These changes will be effective prospectively for fiscal years and interim reporting periods within those years beginning after December 15, 2013. We do not expect this guidance to have a material impact on the consolidated financial position.

ASU No. 2013-11: In July 2013 the FASB issued ASU No. 2013-11 “Presentation of an Unrecognized Tax Benefit When a Net Operating Loss Carryforward, a Similar Tax Loss, or a Tax Credit Carryforward Exists” (Topic 740 Income Taxes). The updated guidance requires an entity to net its unrecognized tax benefits against the deferred tax assets for all same jurisdiction net operating loss carry forward, a similar tax loss, or tax credit carryforwards. A gross presentation will be required only if such carryforward are not available or would not be used by the entity to settle any additional income tax resulting from disallowance of the uncertain tax position. The update is effective prospectively for fiscal year beginning January 1, 2014. We do not expect this guidance to have a material impact on the consolidated financial position.

PROVISIONALLY PRICED SALES

The following are the provisionally priced copper and molybdenum sales outstanding at December 31, 2013, 2012 and 2011:

| Provisionally Priced Sales Copper | 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Millions of pounds | 16.1 | 19.7 | 64.3 |
| Priced at average of (per pound) | $3.34 | $3.59 | $3.44 |
| Molybdenum |  |  |  |
| Millions of pounds | 10.3 | 8.8 | 10.3 |
| Priced at average of (per pound) | $9.70 | $11.60 | $13.35 |

88

Provisional sales adjustments included in accounts receivable and net sales at December 31, 2013, 2012 and 2011 were as follows:

*(in millions)*

| Provisional Sales Adjustments | 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Copper | $1.0 | $2.9 | $1.4 |
| Molybdenum | 0.6 | 3.7 | (3.4) |
| Total | $1.6 | $6.6 | $(2.0) |

Management believes that the final pricing of these sales will not have a material effect on our financial position or results of operations.

RESULTS OF OPERATIONS

The following table highlights key financial results for each of the years in the three-year period ended December 31, 2013.

*(in millions)*

| Statement of Earnings Data | 2013 | 2012 | 2011 | Variance 2013-2012 | 2012-2011 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Net sales | $5,952.9 | $6,669.3 | $6,818.7 | $(716.4) | $(149.4) |
| Cost of sales (exclusive of depreciation, amortization and depletion) | (2,871.3) | (2,769.2) | (2,763.2) | (102.1) | (6.0) |
| Selling, general and administrative | (102.6) | (101.3) | (104.5) | (1.3) | 3.2 |
| Depreciation, amortization and depletion | (395.9) | (325.8) | (288.1) | (70.1) | (37.7) |
| Exploration | (51.0) | (47.9) | (37.5) | (3.1) | (10.4) |
| Legal fees related to the SCC shareholder derivative lawsuit | — | (316.2) | — | 316.2 | (316.2) |
| Operating income | 2,532.1 | 3,108.9 | 3,625.4 | (576.8) | (516.5) |
| Interest expense, net | (196.6) | (172.4) | (186.6) | (24.2) | 14.2 |
| Interest income | 20.0 | 15.2 | 13.8 | 4.8 | 1.4 |
| Other income (expense) | 17.1 | 21.8 | (4.0) | (4.7) | 25.8 |
| Income taxes | (769.3) | (1,080.9) | (1,104.3) | 311.6 | 23.4 |
| Equity earnings of affiliate | 20.9 | 48.7 | — | (27.8) | 48.7 |
| Net income attributable to non-controlling interest | (5.7) | (6.7) | (7.9) | 1.0 | 1.2 |
| Net income attributable to SCC | $1,618.5 | $1,934.6 | $2,336.4 | $(316.1) | $(401.8) |

### NET SALES

2013-2012: Net sales in 2013 were $5,952.9 million, compared to $6,669.3 million in 2012, a decrease of $716.4 million or 10.7%. The decrease was principally the result of lower copper prices and sales volume as well as lower prices for our major by-products partially offset by higher sales volume of molybdenum, zinc and silver. Copper made up 78.2% of net sales in 2013, compared to 77.0% in 2012. Sales of by-products in 2013 totaled $1,298.1 million, compared to $1,532.4 million in 2012, a decrease of 15.3%.

2012-2011: Net sales in 2012 were $6,669.3 million, compared to a record $6,818.7 million in 2011, a decrease of $149.4 million. The decrease was principally the result of lower metal prices. Net sales in 2011 include a gain of $13.5 million on copper hedges.

The table below outlines the average published market metals prices for our metals for each of the three years in the three-year period ended December 31, 2013:

|  | 2013 | 2012 | 2011 | % Change 2012 to 2013 | 2011 to 2012 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Copper price ($ per pound - LME) | $3.32 | $3.61 | $4.00 | (8.0)% | (9.8)% |
| Copper price ($ per pound - COMEX) | $3.34 | $3.61 | $4.01 | (7.5)% | (10.0)% |
| Molybdenum price ($ per pound)(1) | $10.26 | $12.62 | $15.33 | (18.7)% | (17.7)% |
| Zinc price ($ per pound — LME) | $0.87 | $0.88 | $0.99 | (1.1)% | (11.1)% |
| Silver price ($ per ounce - COMEX) | $23.82 | $31.19 | $35.18 | (23.6)% | (11.3)% |

(1) Platt’s Metals Week Dealer Oxide.

The table below provides our metal sales as a percentage of our total net sales.

| Sales as a percentage of total net sales | Year Ended December 31, 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Copper | 78.2% | 77.0% | 76.7% |
| Molybdenum | 6.6% | 6.8% | 8.0% |
| Silver | 6.6% | 7.4% | 7.2% |
| Zinc | 3.4% | 2.9% | 3.1% |
| Other by-products | 5.2% | 5.9% | 5.0% |
| **Total** | 100.0% | 100.0% | 100.0% |

The table below provides our copper sales by type of product.

| Copper Sales (million pounds) | 2013 | 2012 | 2011 | Variance 2013-2012 | 2012-2011 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Refined | 772.7 | 719.9 | 795.8 | 52.8 | (75.9) |
| Blister | 3.7 | 72.4 | — | (68.7) | 72.4 |
| Anode | 2.2 | 5.5 | 23.0 | (3.3) | (17.5) |
| Concentrates and other | 133.9 | 132.2 | 41.7 | 1.7 | 90.5 |
| SX-EW | 190.8 | 218.9 | 218.1 | (28.1) | 0.8 |
| Rod | 279.1 | 265.7 | 242.0 | 13.4 | 23.7 |
| **Total** | 1,382.4 | 1,414.6 | 1,320.6 | (32.2) | 94.0 |

### OPERATING COSTS AND EXPENSES

The table below summarized the production cost structure by major components for the years 2013, 2012 and 2011 as a percentage of total production cost:

|  | Year ended December 31, 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Power | 19.8% | 20.9% | 23.2% |
| Labor | 15.9% | 14.9% | 14.4% |
| Fuel | 14.9% | 13.9% | 13.8% |
| Maintenance | 15.6% | 16.1% | 17.7% |
| Operating material | 18.5% | 18.0% | 15.7% |
| Other | 15.3% | 16.2% | 15.2% |
| Total | 100.0% | 100.0% | 100.0% |

90

2013-2012: Operating costs and expenses in 2013 decreased $139.5 million, compared to 2012, primarily due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for 2012 | $3,560.4 |
| Less: |  |
| · Legal fees related to SCC shareholder derivative lawsuit in 2012, | (316.2) |
| Plus: |  |
| · higher cost of sales (exclusive of depreciation, amortization and depletion), principally as a result of higher production cost (labor, fuel and power and repair material costs) and higher inventory consumption, partially offset by lower workers´ participation, mining royalties and cost of metals purchased from third parties. | 102.1 |
| · higher depreciation, amortization and depletion mainly at our Mexican operations as a result of the acquisition of mine equipment and the start-up of some projects, including the Quebalix III project. | 70.2 |
| · higher exploration expenses | 3.1 |
| · higher general and administrative expenses | 1.3 |
| Operating cost and expenses for 2013 | $3,420.9 |

2012-2011: Operating costs and expenses in 2012 increased $367.1 million, compared to 2011, primarily due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for 2011 | $3,193.3 |
| Plus: |  |
| · legal fees related to SCC shareholder derivative lawsuit in 2012, | 316.2 |
| · higher cost of sales (exclusive of depreciation, amortization and depletion), principally as a result of higher production cost (labor, fuel and power and operating and repair material costs), higher inventory consumption, higher currency translation effect primarily at our Mexican operations and higher workers´ participation; partially offset by lower cost of metals purchased from third parties, and mining royalties. | 6.1 |
| · higher depreciation, amortization and depletion mainly due to the acquisition of mine and other equipment for our Mexican and Peruvian operations, and. | 37.6 |
| · higher exploration expenses | 10.3 |
| Less: |  |
| · lower selling, general and administrative expenses | (3.1) |
| Operating cost and expenses for 2012 | $3,560.4 |

### NON-OPERATING INCOME (EXPENSE)

|  | 2013 | 2012 | 2011 | Variance 2013-2012 | 2012-2011 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Interest expense | $(265.5) | $(201.8) | $(192.3) | $(63.7) | $(9.5) |
| Capitalized interest | 68.9 | 29.4 | 5.8 | 39.5 | 23.6 |
| Other (expense) income | 17.1 | 21.8 | (4.0) | (4.7) | 25.8 |
| Interest income | 20.0 | 15.2 | 13.8 | 4.8 | 1.4 |
| Total non-operating income and expense | $(159.5) | $(135.4) | $(176.7) | $(24.1) | $41.3 |

2013-2012: Non-operating income and expense were a net expense of $159.5 million in 2013 compared to a net expense of $135.4 million in 2012. The $24.1 million increase in expenses in 2013 was due to:

- $(63.7) million of higher interest expense as a result of the $1.5 billion notes issued in November 2012,
- $(18.2) million of a 2012 gain in the sale of our shares of Compania Internacional Minera, a mining company in which we had a minority participation, partially offset by
- $39.5 million of higher capitalized interest due to increased capital expenditures principally at our Mexican operations, and
- $18.4 million received in 2013 from Coimolache as a return of funds provided during the exploration stage of the Tantahuatay mine. These funds were originally expensed on our financial statements.

2012-2011: Non-operating income and expense were a net expense of $135.4 million in 2012 compared to a net expense of $176.7 million in 2011. The $41.3 million decrease in expense in 2012 is due to:

- $23.5 million of higher capitalized interest principally due to the Buenavista capital investment program,
- $18.2 million gain on sale of our shares of Compania Internacional Minera, a Mexican mining company in which we had a minority participation,
- $10.6 million of net gain on short-term investment due to an increase in the mark to market value, partially offset by
- $(9.4) million of higher interest expense as a result of the new debt issued in November 2012.

### Income taxes

|  | 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Provision for income taxes | $769.3 | $1,080.9 | 1,104.3 |
| Effective income tax rate | 32.4% | 36.3% | 32.0% |

The income tax provision includes Peruvian, Mexican and U.S. federal and state income taxes. The higher effective income tax rate in 2012 was principally due to a $316.2 million one-time payment of legal fees related to the SCC shareholder derivative lawsuit, which is being treated as a non-deductible expense.

In 2013, the Mexican Congress enacted tax law changes that became effective on January 1, 2014. Among other things the law maintains the statutory rate at 30%, eliminating rate decreases scheduled to take effect for 2014 and 2015. In addition, the law has made the tax consolidation rules more restrictive. The impact of these changes increased our deferred income tax provision in 2013 by $34.7 million. Please see Note 7 “Income taxes” for a more complete description of the tax changes.

### Equity earnings of affiliate

In 2013 and 2012 we have recognized $20.9 million and 48.7 million of equity earnings of affiliate, from our 44.2% interest in the Tantahuatay mine.

### Net Income attributable to the non-controlling interest

Net income attributable to the non-controlling interest in 2013 was $5.7 million, compared to $6.7 million in 2012, and $7.9 million in 2011 a decrease of $1 million and $1.2 million, respectively. These decreases were the result of lower earnings at our Peruvian operations.

### Net income attributable to SCC

Our net income attributable to SCC in 2013 was $1,618.5 million, compared to $1,934.6 million in 2012 and $2,336.4 million in 2011. Net income attributable to SCC decreased mainly as a result of the decrease in metal prices and other factors described above.

### SEGMENT RESULTS ANALYSIS

We have three segments: the Peruvian operations, the Mexican open-pit operations and the Mexican underground mining operations. Please see a detail definition of them on Item 1 Business — “Business Reporting Segments.”

The following table presents the volume of sales by segment of copper and our significant by-products, for each of the years in the three year period ended December 31, 2013:

| Copper Sales (million pounds) | 2013 | 2012 | 2011 | Variance 2013-2012 | 2012-2011 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Peruvian operations | 680.1 | 703.0 | 694.5 | (22.9) | 8.5 |
| Mexican open-pit | 702.3 | 711.6 | 626.0 | (9.3) | 85.6 |
| Mexican IMMSA unit | 17.3 | 18.8 | 15.5 | (1.5) | 3.3 |
| Other and intersegment elimination | (17.3) | (18.8) | (15.5) | 1.5 | (3.3) |
| Total copper sales | 1,382.4 | 1,414.6 | 1,320.5 | (32.2) | 94.1 |

92

| By-product Sales (million pounds, except silver - million ounces) Peruvian operations: | 2013 | 2012 | 2011 | Variance 2013-2012 | 2012-2011 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Molybdenum contained in concentrate | 17.2 | 16.1 | 18.0 | 1.1 | (1.9) |
| Silver | 3.4 | 3.8 | 3.5 | (0.4) | 0.3 |
| Mexican open-pit operations: |  |  |  |  |  |
| Molybdenum contained in concentrate | 26.7 | 24.1 | 23.1 | 2.6 | 1.0 |
| Silver | 10.1 | 9.1 | 7.1 | 1.0 | 2.0 |
| IMMSA unit |  |  |  |  |  |
| Zinc-refined and in concentrate | 218.5 | 205.9 | 199.9 | 12.6 | 6.0 |
| Silver | 4.9 | 5.4 | 5.2 | (0.5) | 0.2 |
| Other and intersegment elimination |  |  |  |  |  |
| Zinc |  | — | — | — | — |
| Silver | (1.8) | (2.1) | (1.6) | 0.3 | (0.5) |
| Total by-product sales |  |  |  |  |  |
| Molybdenum contained in concentrate | 43.9 | 40.2 | 41.1 | 3.7 | (0.9) |
| Zinc-refined and in concentrate | 218.5 | 205.9 | 199.9 | 12.6 | 6.0 |
| Silver | 16.6 | 16.2 | 14.2 | 0.4 | 2.0 |

### Peruvian Open-pit Operations

|  | Twelve Months Ended December 31, 2013 | 2012 | 2011 | Variance 2013-2012 | 2012-2011 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Net sales | $2,614.6 | $2,952.3 | $3,186.5 | $(337.7) | $(234.2) |
| Operating costs and expenses | (1,606.2) | (1,603.8) | (1,644.4) | (2.4) | 40.6 |
| Operating income | $1,008.4 | $1,348.5 | $1,542.1 | $(340.1) | $(193.6) |

### Net sales:

2013-2012: Net sales in 2013 decreased $337.7 million, compared to 2012, primarily due to the decrease in market prices of our principal products and lower sales volume of copper partially offset by higher molybdenum sales volume.

2012-2011: Net sales in 2012 decreased $234.2 million, compared to 2011, primarily due to the decrease in the price of copper and the prices of our major by-products.

### Operating costs and expenses:

2013-2012: Operating costs and expenses in 2013 increased $2.4 million, compared to 2012, principally due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for 2012 | $1,603.8 |
| Plus: |  |
| · higher depreciation, amortization and depletion due to the acquisition of mine equipment, | 16.9 |
| · higher general and administrative expenses, and | 1.3 |
| · higher exploration expenses. | 6.1 |
| Less: |  |
| · lower cost of sales (exclusive of depreciation, amortization and depletion), mainly due to lower mining royalties, cost of metals purchased from third parties, inventory consumption and workers´ participation; partially offset by higher production cost (higher labor cost due to the new collective bargaining agreements and higher operating and repair costs due to cost inflation). | (21.9) |
| Operating cost and expenses for 2013 | $1,606.2 |

93

2012-2011: Operating costs and expenses in 2012 decreased $40.5 million, compared to 2011, principally due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for 2011 | $1,644.4 |
| Less: |  |
| · lower cost of sales (exclusive of depreciation, amortization and depletion), principally as a result of lower cost of metals purchased from third parties; partially offset by higher inventory consumption and production cost (labor, fuel and power and operating and repair material costs). | (60.5) |
| · lower general and administrative expenses. | (2.2) |
| Plus: |  |
| · higher depreciation, amortization and depletion, | 19.7 |
| · higher exploration expenses. | 2.4 |
| Operating cost and expenses for 2012 | $1,603.8 |

### Mexican Open-pit Operations

|  | Twelve Months Ended December 31, 2013 | 2012 | 2011 | Variance 2013-2012 | 2012-2011 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Net sales | $2,976.7 | $3,339.0 | $3,212.1 | $(362.3) | $126.9 |
| Operating costs and expenses | (1,526.4) | (1,413.4) | (1,287.0) | (113.0) | (126.4) |
| Operating income | $1,450.3 | $1,925.6 | $1,925.1 | $(475.3) | $0.5 |

### Net sales:

2013-2012: Net sales in 2013 decreased by $362.3 million, compared to 2012, due to lower metal prices and lower copper sales volume as a result of a temporary flooding problem at the Buenavista mine, partially offset by higher molybdenum and silver sales volumes. Molybdenum sales volume increased due to a new record production at La Caridad mine and the first production of the new molybdenum plant at the Buenavista mine. We estimate that approximately 50.6 million pounds of copper sales were lost as a result of the flooding problems.

2012-2011: Net sales in 2012 increased by $126.9 million, compared to 2011, largely as a result of higher copper sales volume from Buenavista, which had a production record of 441.0 million pounds of copper, partially offset by lower prices for copper and for our principal by-products.

### Operating costs and expenses:

2013-2012: Operating costs and expenses in 2013 increased $113.0 million, compared to 2012, principally due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for 2012 | $1,413.4 |
| Plus: |  |
| · higher cost of sales (exclusive of depreciation, amortization and depletion), principally as a result of higher inventory consumption and production cost (labor, fuel and power and operating and repair material costs); partially offset by lower cost of metals purchased from third parties, sales expenses and workers´participation. | 80.7 |
| · higher depreciation, amortization and depletion due to the acquisition of mine equipment, and | 33.3 |
| · higher general and administrative expenses. | 1.0 |
| Less: |  |
| · lower exploration expenses | (2.0) |
| Operating cost and expenses for 2013 | $1,526.4 |

94

2012-2011: Operating costs and expenses in 2012 increased $126.4 million, compared to 2011, principally due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for 2011 | $1,287.0 |
| Plus: |  |
| · higher cost of sales (exclusive of depreciation, amortization and depletion), principally as a result of higher production cost (labor, fuel and power and operating and repair material costs), higher workers’ participation and higher currency translation effect; partially offset by lower inventory consumption and other cost of sales. | 112.4 |
| · higher depreciation, amortization and depletion, | 12.0 |
| · higher exploration expenses, and | 1.7 |
| · higher selling, general and administrative expenses. | 0.3 |
| Operating cost and expenses for 2012 | $1,413.4 |

### IMMSA unit

|  | Twelve Months Ended December 31, 2013 | 2012 | 2011 | Variance 2013-2012 | 2012-2011 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Net sales | $458.5 | $513.0 | $546.2 | $(54.5) | $(33.2) |
| Operating costs and expenses | (394.0) | (360.4) | (370.5) | (33.6) | 10.1 |
| Operating income | $64.5 | $152.6 | $175.7 | $(88.1) | $(23.1) |

### Net sales:

2013-2012: Net sales in 2013 decreased $54.5 million, compared to 2012, mainly due to lower metal prices of zinc and silver, partially offset by higher zinc sales volume mainly from the Santa Eulalia mine which restored production after resolving its prior years flooding problems.

2012-2011: Net sales in 2012 decreased $33.2 million, compared to 2011 mainly due to lower metal prices of zinc and silver, partially offset by higher zinc sales volume mainly from the Santa Eulalia mine which partially restored production after resolving its prior years flooding problems.

### Operating costs and expenses:

2013-2012: Operating costs and expenses in 2013 increased $33.6 million, compared to 2012, principally due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for 2012 | $360.4 |
| Plus: |  |
| · higher cost of sales (exclusive of depreciation, amortization and depletion), principally as a result of higher net currency translation effect, higher cost of metals purchased from third parties, higher production cost (labor, fuel and power and operating and repair material costs); partially offset by lower inventory consumption. | 28.3 |
| · higher selling, general and administrative expenses, and | 0.5 |
| · higher depreciation, amortization and depletion. | 5.8 |
| Less: |  |
| · lower exploration expenses. | (1.0) |
| Operating cost and expenses for 2013 | $394.0 |

95

2012-2011: Operating costs and expenses in 2012 decreased $10.1 million, compared to 2011, principally due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for 2011 | $370.5 |
| Less: |  |
| · lower cost of sales (exclusive of depreciation, amortization and depletion), principally as a result of lower net currency translation effect and lower cost of metals purchased from third parties; partially offset by higher production cost, higher workers’ participation and other cost of sales. | (16.9) |
| · lower selling, general and administrative expenses | (0.1) |
| Plus: |  |
| · higher depreciation, amortization and depletion and | 0.7 |
| · higher exploration expenses | 6.2 |
| Operating cost and expenses for 2012 | $360.4 |

### Intersegment Eliminations and Adjustments

The net sales, operating costs and expenses and operating income discussed above will not be directly equal to amounts in our consolidated statement of earnings because the adjustments of intersegment operating revenues and expenses must be taken into account. Please see Note 19 “Segment and Related Information” of our consolidated financial statements.

LIQUIDITY AND CAPITAL RESOURCES

The following discussion relates to our liquidity and capital resources for each of the years in the three year period ended December 31, 2013.

### Liquidity

The following table shows the cash flow for the three year period ended December 31, 2013 (in millions):

|  | 2013 | 2012 | 2011 | Variance 2013-2012 | 2012-2011 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Net cash provided from operating activities | $1,857.2 | $2,004.0 | $2,079.9 | $(146.8) | $(75.9) |
| Net cash used for investing activities | $(1,744.9) | $(668.6) | $(1,092.9) | (1,076.4) | $424.3 |
| Net cash (used for) provided from financing activities | $(865.3) | $278.1 | $(2,375.0) | $(1,143.3) | $2,653.1 |

### Net cash provided from operating activities:

The 2013, 2012 and 2011 change in operating assets and liabilities include (in millions):

|  | 2013 | 2012 | 2011 | Variance 2013-2012 | 2012-2011 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Accounts receivable | $136.1 | $(14.7) | $(135.6) | $150.8 | $120.9 |
| Inventories | (143.6) | (180.7) | (194.5) | 37.1 | 13.8 |
| Accounts payable and accrued liabilities | (63.6) | (135.7) | (136.9) | 72.1 | 1.2 |
| Other operating assets and liabilities | 2.3 | 43.5 | 47.8 | (41.2) | (4.3) |
| Total | $(68.8) | $(287.6) | $(419.2) | $218.8 | $131.6 |

2013: In 2013, net income was $1,624.2 million, approximately 87.5% of the net operating cash flow. Significant items added to (deducted from) net income, to arrive at operating cash flow included:

- $396.0 million of depreciation, amortization and depletion,
- $ 13.1 million of currency translation loss,
- $(97.2) million of a deferred income tax benefit, and
- $(10.1) million of equity earnings of affiliate, net of dividend received.

In addition, in 2013 an increase in working capital reduced operating cash flow by $68.8 million and included:

- A decrease in accounts receivable mainly due to lower prices and lower sales volume.
- An inventory increase mainly due to an increase of $(197.5) million in leachable material partially reduced by the consumption of the metal in process.
- A decrease in accounts payable and accrued liabilities was mainly due to higher payment of income tax and workers’ participation than amounts accrued.

2012: In 2012, net income was $1,941.4 million, approximately 96.9% of the net operating cash flow. Significant items added to (deducted from) net income, to arrive at operating cash flow included:

- $325.7 million of depreciation, amortization and depletion,
- $55.8 million of a deferred income tax provision , and
- $(18.2) million of a gain on sale of investment.

In addition, in 2012 an increase in working capital decreased operating cash flow by $287.6 million, as detailed above, and included:

- The increase in inventories of $180.7 million which includes an increase of $157.0 million in capitalized leachable material and $31.8 million of higher supplies inventory.
- The decrease in accounts payable and accrued liabilities was mainly due to higher income tax payments.

2011: In 2011, net income was $2,344.3 million, approximately 112.7% of the net operating cash flow. Significant items added to (deducted from) net income, to arrive to operating cash flow included:

- $288.1 million of depreciation, amortization and depletion and

$(117.9) million of a deferred income tax benefit.

In addition, in 2011 an increase in working capital decreased operating cash flow by $419.2 million, and included:

- An increase in accounts receivable principally due to higher sales volume resulting from the restoration of the Buenavista mine production.
- An increase in inventories of $194.5 million, which includes an increase of $118.8 million in capitalized leachable material, $25.4 million in finished goods inventory, principally due to shipping delays and $43.1 million of higher work-in process inventory, principally due to the restoration of the Buenavista mine, and
- A decrease in accounts payable and accrued liabilities mainly due to payments to suppliers and income tax payments.

### Net cash used for investing activities:

**2013:** Net cash used for investing activities in 2013 included $1,703.3 million for capital expenditures. The capital expenditures included:

- $1,331.0 million of investments at our Mexican operations:
- $167.9 million for the Buenavista mine equipment,
- $388.3 million for the new Buenavista concentrator,
- $226.7 million for the SX-EW III project,
- $ 39.0 million for new projects infrastructure,
- $ 54.0 million for the Quebalix IV project,
- $ 60.6 million at our IMMSA unit, and
- $394.5 million for various other replacement expenditures.
- $372.3 million of investments at our Peruvian operations:
- $41.1 million for the Tia Maria project,
- $56.7 million for the Toquepala projects,
- $59.4 million for the improvement of slope stability at the south area of Cuajone, and
- $215.1 million for various other replacement expenditures.

The 2013 investment activities include a purchase of short-term investments of $74.0 million. The year also includes a $22.7 million loan repayment from an affiliate and the release of the escrow deposit of $5.1 million related to the final payment of the Mitsui loan.

**2012:** Net cash used for investing activities in 2012 included $1,051.9 million for capital expenditures. The capital expenditures included:

- $794.0 million of investments at our Mexican operations:
- $216.3 million for the Buenavista mine equipment,
- $149.0 million for the new Buenavista concentrator,
- $138.3 million for the SX-EW III project,
- $69.1 million for new projects infrastructure,
- $56.0 million at our IMMSA unit, and
- $165.3 million for various other replacement expenditures.
- $257.9 million of investments at our Peruvian operations:
- $ 32.7 million for the Toquepala projects,
- $ 52.0 million for the Cuajone projects, and
- $173.2 million for various other replacement expenditures.

The 2012 investment activities include $152.4 million used for the purchase of short-term investments and a $37.6 million loan made to an affiliate company, less $540.1 million of proceeds on the sales of short-term investments, $18.2 million from the sale of an investment and $15.1 million of proceeds from the sale of inactive properties.

**2011:** Net cash used for investing activities in 2011 included $612.9 million for capital expenditures. The capital expenditures included:

- $407.4 million of investments at our Mexican operations:
- $97.4 million for the Buenavista mine equipment,
- $96.7 million for the Buenavista mine rehabilitation and benefit plant,
- $7.7 million for the new Buenavista concentrator,
- $6.5 million for the SX-EW III project,
- $3.2 million for new projects infrastructure,
- $48.7 million at our IMMSA unit, and
- $147.2 million for various other replacement expenditures.
- $205.5 million of investments at our Peruvian operations:
- $76.0 million for the Toquepala projects,
- $38.9 million for the Cuajone projects, and
- $90.6 million for various other replacement expenditures.

The 2011 investment activities include $449.5 million net purchase of short-term investment, and $33.3 million for our share of the investment in the development of the Tantahuatay gold project, less $12.6 million of proceeds from the sale of inactive properties.

### Net cash used for (provided from) financing activities:

**2013:** Net cash used for financing activities in 2013 was $865.3 million and included:

- A dividend distribution of $573.8 million,
- cash used to repurchase 10.2 million of our common shares at a cost of $281.4 million,
- payment of principal of $10.0 million on the Mitsui loan, net of
- a distribution of $1.4 million to the non-controlling interest.

**2012:** Net cash provided from financing activities was $278.1 million and included:

- The issuance of new debt of $1,477.5 million,
- the payment received, related to the SCC shareholder derivative lawsuit of $2,108.2 million , reduced by
- a dividend distribution of $3,140.0 ,
- the repurchase of 4.4 million shares of our common stock at a cost of $147.3 million ,
- a debt repayment of $10 million, and
- a distribution to our non-controlling interest investors of $3.6 million.

**2011:** Net cash used for financing activities was $2,375.0 million and included:

- A dividend distribution of $2,080.4 million,
- the repurchase of 9 million shares of our common stock a cost of $273.7 million,
- a debt repayment of $15.3 million, and
- the distribution to our non-controlling interest investors of $6.9 million.

### Other Liquidity Considerations

We expect that we will meet our cash requirements for 2014 and beyond from cash on hand and internally generated funds. In addition, we believe that we will be able to access additional external financing on reasonable terms, if required.

Share repurchase program: In 2008, our Board of Directors authorized a share repurchase program, which was increased in 2013 to $2 billion. Since the inception of the program we have purchased 57.2 million shares of our common stock at a cost of $1,159.5 million. These shares will be available for general corporate purposes. We may purchase additional shares of our common stock from time to time, based on market conditions and other factors. This repurchase program has no expiration date and may be modified or discontinued at any time. For further details please see Item 5 - SCC common stock repurchase plan.

Dividend: On January 30, 2014, the Board of Directors authorized a cash dividend of $0.12 per share of common stock payable on March 4, 2014, to shareholders of record at the close of business on February 18, 2014.

SCC shareholder derivative lawsuit: On October 9, 2012, we received from AMC, our majority shareholder, $2.1 billion in satisfaction of the judgment issued pursuant to the decision of the Court of Chancery of Delaware which concluded that we paid an excessive price to AMC in the 2005 merger between the Company and Minera Mexico, S.A. de C.V. From the aforementioned sum received from AMC, we paid $316.2 million to the plaintiff’s attorneys to satisfy the award of attorneys’ fees and expenses. The effect of these transactions was recorded in our 2012 results.

FINANCING

In November 2012, we issued $1.5 billion of fixed-rate unsecured notes with a discount of $22.5 million, which is being amortized over the term of the related debt. This debt was issued in two tranches, $300 million due in 2022 at an annual interest rate of 3.5% and $1.2 billion due in 2042 at an annual interest rate of 5.25%. Net proceeds will be used for general corporate purposes, including the financing of our capital expenditure program. In 2013, World Finance, an international business magazine, recognized this debt as the best international debt issuance of the year in the mining industry.

Our total debt at December 31, 2013 was $4,204.9 million, compared to $4,213.9 million at December 31, 2012, net of the unamortized discount of notes issued under par of $46.2 million and $47.3 million at December 31, 2013 and 2012, respectively. The decrease in total debt during 2013 was due to the final payment of the Mitsui loan.

The ratio of total debt to total capitalization was 43.1% at December 31, 2013, compared to 46.8% at December 31, 2012. Also the ratio of net debt to net capitalization was 31.3% at December 31, 2013, compared to 26.8% at December 31, 2012.

We define net debt as total debt, including current maturities, minus cash and cash equivalents. We believe that net debt is useful to investors as a measure of our financial position. We define net capitalization as the sum of net debt and equity. We use the net debt to net capitalization ratio as measure of our indebtedness position and to determine how much debt can we take in addition to the use of the equity and the balance sheet in general. We define total capitalization as the sum of the carrying values of our total debt, including current maturities, and equity. A reconciliation of our net debt to net capitalization and total debt to total capitalization as included in the consolidated balance sheet is presented under the sub heading “Non-GAAP Information Reconciliation,” below.

Please see Note 10 “Financing” for a discussion about the covenants requirements related to our long-term debt.

#### Capital investment programs

A discussion of our capital investment programs is an important part of understanding our liquidity and capital resources. We expect to meet the cash requirements for these capital expenditures from cash on hand, internally generated funds and from additional external financing if required. For information regarding our capital expenditure programs, please see the discussion under the caption “Capital Investment Program” under this Item 7.

CONTRACTUAL OBLIGATIONS

The following table summarizes our significant contractual obligations as of December 31, 2013:

*(dollars in millions)*

|  | Total | Payments due by Period 2014 | 2015 | 2016 | 2017 | 2018 | 2019 and Thereafter |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Long-term debt | $4,251.1 | — | $200.0 | — | — | — | $4,051.1 |
| Interest on debt | 5,726.4 | $261.9 | 256.3 | $249.0 | $248.9 | $248.9 | 4,461.4 |
| Uncertain tax position(a) | 221.2 | — | — | — | — | — | — |
| Workers’ participation | 192.3 | 192.3 | — | — | — | — | — |
| Pension and post-retirement obligations | 32.8 | 3.1 | 2.8 | 2.9 | 3.0 | 3.1 | 17.9 |
| Asset retirement obligation | 124.8 | — | — | — | — | — | 124.8 |
| Purchase obligations: |  |  |  |  |  |  |  |
| Commitment to purchase energy | 8,551.3 | 463.2 | 546.5 | 597.6 | 433.1 | 348.6 | 6,162.3 |
| Capital expenditure projects | 1,142.2 | 910.3 | 231.9 | — | — | — | — |
| Total | $20,242.1 | $1,830.8 | $1,237.5 | $849.5 | $685.0 | $600.6 | $14,817.5 |

(a) The above table does not include any future payment related to uncertain tax position liabilities because there is often a high degree of uncertainty regarding the timing of future cash outflows. As of December 31, 2013 the liability recognized by the Company is $221.2 million and is included as non-current liability in the consolidated balance sheet.

Long-term debt payments do not include the debt discount valuation account of $46.2 million.

Interest on debt is calculated at rates in effect at December 31, 2013. As all our debt is at fixed rates, future expenditures will not change due to rate changes. Please refer to Note 10 “Financing” of our consolidated financial statements for a description of our long-term debt arrangements and credit facilities.

Workers’ participation is currently calculated based on Peruvian Branch and Mexican pre-tax earnings. In Peru, the provision for workers’ participation is calculated at 8% of pre-tax earnings. The current portion of this participation, which is accrued during the year, is based on the Peruvian Branch’s taxable income and is largely distributed to workers following determination of final results for the year. Amounts in excess of 18 times a worker’s salary is distributed to governmental bodies. In Mexico, workers’ participation is determined using the guidelines established in the Mexican income tax law at a rate of 10% of pre-tax earnings as adjusted by the tax law.

Pension and post retirement obligations include the benefits expected to be paid under our pension and post-retirement benefit plans. Please refer to Note 11 “Benefit Plans” of our consolidated financial statements.

Asset retirement obligations include the aggregate amount of the closure and remediation costs of our Peruvian mines and facilities to be paid under the mine closure plans approved by MINEM and the closure and remediation costs of our Mexican operations. See Note 9 “Asset Retirement Obligation.”

We have a commitment to purchase power for our Peruvian operations from Enersur through April 2017. Also we have a commitment to purchase power for our Mexican operations from MGE, a subsidiary of Grupo Mexico through 2032. See Note

13 “Commitment and Contingencies”. Amounts indicated on the above table are based on our long-term estimated power costs, which are subject to change as energy generation costs change and our forecasted power requirements through the life of the agreements change.

Capital expenditure projects include committed purchase orders and executed contracts principally for our Mexican projects at the Buenavista mine.

NON-GAAP INFORMATION RECONCILIATION

Operating cash cost: Following is a reconciliation of “Operating Cash Cost” (see page 80) to cost of sales (exclusive of depreciation, amortization and depletion) as reported in our consolidated statement of earnings, in millions of dollars and dollars per pound in the table below:

|  | 2013 $ million | $ per pound | 2012 $ million | $ per pound | 2011 $ million | $ per pound |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Cost of sales (exclusive of depreciation, amortization and depletion) | $2,871.3 | $2.15 | $2,769.2 | $2.01 | $2,763.2 | $2.19 |
| Add: |  |  |  |  |  |  |
| Selling, general and administrative | 102.6 | 0.08 | 101.3 | 0.07 | 104.5 | 0.08 |
| Sales premiums, net of treatment and refining charges | (12.9) | (0.01) | (8.8) | (0.01) | (16.0) | (0.01) |
| Less: |  |  |  |  |  |  |
| Workers’ participation | (226.5) | (0.17) | (268.6) | (0.19) | (245.7) | (0.19) |
| Cost of metals purchased from third parties | (203.1) | (0.15) | (241.9) | (0.18) | (560.4) | (0.44) |
| Royalty charge and other, net | (89.5) | (0.07) | (117.2) | (0.08) | (98.4) | (0.08) |
| Inventory change | 123.4 | 0.09 | 148.8 | 0.11 | 192.2 | 0.15 |
| **Operating Cash Cost without by-product revenues** | **$2,565.3** | **$1.92** | **$2,382.8** | **$1.73** | **$2,139.4** | **$1.70** |
| Add: |  |  |  |  |  |  |
| By-product revenues (1) | (1,213.5) | (0.91) | (1,410.5) | (1.02) | (1,476.9) | (1.17) |
| Net revenue on sale of metal purchased from third parties | (17.9) | (0.01) | (18.8) | (0.2) | (25.0) | (0.02) |
| Add: |  |  |  |  |  |  |
| Total by-product revenues | (1,231.4) | (0.92) | (1,429.3) | (1.04) | (1,501.9) | (1.19) |
| **Operating Cash Cost with by-product revenues** | **$1,333.9** | **$(1.00)** | **$953.5** | **$(0.69)** | **$637.5** | **$(0.51)** |
| Total pounds of copper produced (in millions) | 1,338.8 |  | 1,377.4 |  | 1,259.5 |  |

(1) By-product revenues included in our presentation of operating cash cost contain the following:

|  | 2013 $ million | $ per pound | 2012 $ million | $ per pound | 2011 $ million | $ per pound |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Molydenum | $(412.2) | (0.31) | $(474.4) | (0.34) | $(573.0) | (0.45) |
| Silver | (305.8) | (0.23) | (381.4) | (0.28) | (390.9) | (0.31) |
| Zinc | (202.3) | (0.15) | (196.1) | (0.14) | (210.0) | (0.17) |
| Sulfuric Acid | (154.5) | (0.12) | (210.9) | (0.15) | (163.6) | (0.13) |
| Gold | (51.1) | (0.04) | (60.8) | (0.04) | (40.8) | (0.03) |
| Other products | (87.6) | (0.06) | (86.9) | (0.07) | (98.6) | (0.08) |
| **Total** | **$(1,213.5)** | **(0.91)** | **$(1,410.5)** | **(1.02)** | **$(1,476.9)** | **(1.17)** |

101

Net debt to net capitalization: Net debt to net capitalization as of December 31, 2013 and 2012 is as follows:

|  | 2013 | 2012 |
| --- | ---: | ---: |
| Total debt | $4,204.9 | $4,213.9 |
| Cash and cash equivalent balance | (1,627.7) | (2,459.5) |
| Net debt | 2,532.2 | 1,754.4 |
| Net capitalization: |  |  |
| Net debt | 2,532.2 | 1,754.4 |
| Equity | 5,561.8 | 4,789.1 |
| Net capitalization | $8,094.0 | $6,543.5 |
| Net debt/net capitalization (\*) | 31.3% | 26.8% |

(\*) Represents net debt divided by net capitalization.

#### Total debt to total capitalization:

Total debt to total capitalization as of December 31, 2013 and 2012 is as follows:

|  | 2013 | 2012 |
| --- | ---: | ---: |
| Total debt | $4,204.9 | $4,213.9 |
| Capitalization |  |  |
| Debt | 4,204.9 | 4,213.9 |
| Equity | 5,561.8 | 4,789.1 |
| Total capitalization | $9,766.7 | $9,003.0 |
| Total debt/total capitalization (\*) | 43.1% | 46.8% |

(\*) Represents debt divided by total capitalization.

#### Operating costs and expenses

*(in millions)*

|  | 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Operating costs and expenses (GAAP measure) | $3,420.8 | $3,560.4 | $3,193.3 |
| Less |  |  |  |
| Legal fees related to SCC shareholder derivative lawsuit | — | 316.2 | — |
| Operating costs and expenses (Non-GAAP measure) | $3,420.8 | $3,244.2 | $3,193.3 |

102

## Market risk

As filed, 6,243 characters.

#### Commodity price risk:

We are subject to market risks arising from the volatility of copper and other metal prices. For 2014, assuming that expected metal production and sales are achieved, that tax rates are unchanged, giving no effects to potential hedging programs, metal price sensitivity factors would indicate the following change in estimated annual net income attributable to SCC resulting from metal price changes:

|  | Copper | Molybdenum | Zinc | Silver |
| --- | ---: | ---: | ---: | ---: |
| Change in metal prices (per pound except silver — per ounce) | $0.01 | $1.00 | $0.01 | $1.0 |
| Annual change in net income attributable to SCC (in millions) | $8.7 | $28.0 | $1.3 | $9.6 |

#### Open sales risk:

Our provisional copper and molybdenum sales contain an embedded derivative that is required to be separate from the host contract for accounting purposes. The host contract is the receivable from the sale of copper and molybdenum concentrates at prevailing market prices at the time of the sale. The embedded derivative, which does not qualify for hedge accounting, is marked to market through earnings each period prior to settlement.

Following are the provisionally priced copper and molybdenum sales outstanding at December 31, 2013:

|  | Sales volume (million lbs.) | Priced at (per pound) | Month of settlement |
| --- | ---: | ---: | --- |
| Copper | 16.1 | $3.34 | January through February 2014 |
| Molybdenum | 10.3 | $9.70 | January through April 2014 |

Provisional sales price adjustments included in accounts receivable and net sales at December, 31, 2013 were $1.0 million for copper and $0.6 million for molybdenum

#### Foreign currency exchange rate risk:

Our functional currency is the U.S. dollar. Portions of our operating costs are denominated in Peruvian nuevos soles and Mexican pesos. Since our revenues are primarily denominated in U.S. dollars, when inflation or deflation in our Mexican or Peruvian operations is not offset by a change in the exchange rate of the nuevo sol or the peso, to the dollar, our financial position, results of operations and cash flows could be affected by local cost conversion when expressed in U.S. dollars. In addition, the dollar value of our net monetary assets denominated in nuevos soles or pesos can be affected by exchange rate variances of the nuevo sol or the peso, resulting in a re-measurement gain or loss in our financial statements. Recent inflation and exchange rate variances are provided in the table below:

| Peru: | Years Ended December 31, 2013 | 2012 | 2011 |
| --- | ---: | ---: | ---: |
| Peruvian inflation rate | 2.9% | 2.6% | 4.8% |
| Initial exchange rate | 2.551 | 2.697 | 2.809 |
| Closing exchange rate | 2.796 | 2.551 | 2.697 |
| Appreciation/(devaluation) | (9.6)% | 5.4% | 4.0% |
| Mexico: |  |  |  |
| Mexican inflation rate | 4.0% | 3.6% | 3.8% |
| Initial exchange rate | 13.010 | 13.979 | 12.357 |
| Closing exchange rate | 13.077 | 13.010 | 13.979 |
| Appreciation/(devaluation) | (0.5)% | 6.9% | (13.1)% |

103

#### Change in monetary position:

Assuming an exchange rate variance of 10% at December 31, 2013, we estimate our net monetary position in Peruvian nuevos soles and Mexican pesos would increase (decrease) our net earnings as follows:

|  | Effect in net earnings ($ in millions) |
| --- | ---: |
| Appreciation of 10% in U.S. dollar vs. nuevo sol | $5.9 |
| Devaluation of 10% in U.S. dollar vs. nuevo sol | $(4.9) |
| Appreciation of 10% in U.S. dollar vs. Mexican peso | $37.1 |
| Devaluation of 10% in U.S. dollar vs. Mexican peso | $(30.4) |

The net monetary position is net of those assets and liabilities that are nuevo sol or peso denominated at December 31, 2013.

Copper hedges:

In 2011, we entered into copper swaps and zero cost collar derivative contracts to reduce price volatility and to protect our sales value as shown below. These transactions meet the requirements of hedge accounting. The realized gains and losses from these derivatives were recorded in net sales on the consolidated statement of earnings and included in operating activities on the consolidated statement of cash flows. At December 31, 2012 and 2013 we did not hold any copper hedge positions.

#### Short-term investments:

Short-term investments were as follows (in millions):

|  | At December 31, 2013 | 2012 |
| --- | ---: | ---: |
| Trading securities | $202.6 | $127.8 |
| Weighted average interest rate | 3.78% | 1.87% |
| Available-for- sale | $5.7 | $6.5 |
| Weighted average interest rate | 0.42% | 0.43% |
| Total | $208.3 | $134.3 |

Trading securities consist of bonds issued by public companies and are publicly traded. Each financial instrument is independent of the others. We have the intention to sell these bonds in the short-term.

Available-for-sale investments consist of securities issued by public companies. Each security is independent of the others and, as of December 31, 2013 and December 31, 2012 included corporate bonds and asset and mortgage backed obligations. As of December 31, 2013 and 2012, gross unrealized gains and losses on available-for-sale securities were not material.

Related to these investments we earned interest, which was recorded as interest income in the consolidated statement of earnings. Also, we redeemed some of these securities and recognized gains (losses) due to changes in fair value, which were recorded as other income (expense) in the consolidated statement of earnings.

The following table summarizes the activity of these investments by category (in millions):

| Trading: | Years ended December 31, 2013 | 2012 |
| --- | ---: | ---: |
| Interest earned | $5.2 | $3.1 |
| Unrealized gain (loss) at December 31, | $(1.9) | $2.4 |
| Available-for-sale: |  |  |
| Interest earned | (\*) | $0.1 |
| Investment redeemed | $0.8 | $1.9 |

(\*) Less than $0.1 million

At December 31, 2013 and 2012, contractual maturities of our available-for-sale debt securities are as follows (in millions):

|  | 2013 | 2012 |
| --- | ---: | ---: |
| One year or less | $0.4 | $0.4 |
| Maturing after one year through five years | — | — |
| Maturing after five years through ten years | 0.2 | — |
| Due after 10 years | 5.1 | 6.1 |
| Total debt securities | $5.7 | $6.5 |

105

## Controls and procedures

As filed, 7,255 characters.

As of December 31, 2013, the Company conducted an evaluation under the supervision and with the participation of the Company’s Disclosure Committee and the Company’s management, including the Chief Executive Officer and Chief Financial Officer, of the effectiveness and the design and operation of the Company’s disclosure controls and procedures. Based on that evaluation, the Chief Executive Officer and the Chief Financial Officer have concluded that the Company’s disclosure controls and procedures are effective as of December 31, 2013, to ensure that information required to be disclosed in reports filed or submitted under the Exchange Act is:

1\. recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and

2\. accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

CHANGES IN INTERNAL CONTROL OVER FINANCIAL REPORTING

There was no change in the Company’s internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934, as amended) that occurred during the quarter ended December 31, 2013 that has materially affected, or is reasonably likely to materially affect, the Company’s internal controls over financial reporting.

MANAGEMENT’S REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

Management is responsible for establishing and maintaining adequate internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the Company. Under the supervision and with the participation of management, including the Company’s principal executive officer and principal financial officer, the Company conducted an evaluation of the effectiveness of its internal control over financial reporting based on the framework in Internal Control-Integrated Framework (1992) issued by the Committee of Sponsoring Organization of the Treadway Commission. Based on the evaluation made under this framework, management concluded that as of December 31, 2013 such internal control over financial reporting is effective.

Because of its inherent limitations, internal control over financial reporting, may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness for future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with policies or procedures may deteriorate.

Our internal control over financial reporting as of December 31, 2013, has been audited by Galaz, Yamazaki, Ruiz Urquiza, S.C. Member of Deloitte Touche Tohmatsu Limited, an independent registered public accounting firm, as stated in their report which is provided below.

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM ON INTERNAL CONTROL OVER FINANCIAL REPORTING

To the Board of Directors and Stockholders of Southern Copper Corporation:

We have audited the internal control over financial reporting of Southern Copper Corporation and subsidiaries (the “Company”) as of December 31, 2013, based on criteria established in Internal Control — Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission. The Company’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying “Management’s Report on Internal Control over Financial Reporting” appearing in Item 9A. Our responsibility is to express an opinion on the Company’s internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

A company’s internal control over financial reporting is a process designed by, or under the supervision of, the company’s principal executive and principal financial officers, or persons performing similar functions, and effected by the Company’s Board of Directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2013, based on the criteria established in Internal Control — Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated financial statements and financial statement schedules as of and for the year ended December 31, 2013 of the Company and our report dated February 26, 2014 expressed an unqualified opinion on those financial statements and financial statement schedules.

Galaz, Yamazaki, Ruiz Urquiza S.C.

Member of Deloitte Touche Tohmatsu Limited

C.P.C. Miguel Angel Andrade Leven

Mexico City, Mexico

February 26, 2014

Filed Feb 27, 2014.
Source: SEC EDGAR, the filing index for accession 0001104659-14-014124. Last ingested by Listed: Nov 4, 2026, 00:34 ET. No prices; not investment advice.