# Southern Copper Corp/: Form 10-Q for the period ended Jun 30, 2014

- Company: [Southern Copper Corp/](/companies/scco.md) (CIK 1001838)
- Form: 10-Q
- Filed: 2014-08-05
- Accepted by EDGAR: Aug 5, 2014, 17:22 ET
- Period: 2014-06-30
- Accession: 0001104659-14-057009
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1001838/000110465914057009/a14-14049_110q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1001838/000110465914057009/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2014-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2014-04-01 to 2014-06-30 | $1.49bn | us-gaap:Revenues |
| Revenue | 6 months, 2014-01-01 to 2014-06-30 | $2.84bn | us-gaap:Revenues |
| Cost of revenue | 3 months, 2014-04-01 to 2014-06-30 | $726.6m | us-gaap:CostOfRevenue |
| Cost of revenue | 6 months, 2014-01-01 to 2014-06-30 | $1.37bn | us-gaap:CostOfRevenue |
| Selling, general and administrative | 3 months, 2014-04-01 to 2014-06-30 | $25.4m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Selling, general and administrative | 6 months, 2014-01-01 to 2014-06-30 | $49.9m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months, 2014-04-01 to 2014-06-30 | $597.3m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2014-01-01 to 2014-06-30 | $1.16bn | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2014-04-01 to 2014-06-30 | $225.8m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2014-01-01 to 2014-06-30 | $429.9m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2014-04-01 to 2014-06-30 | $338.4m | us-gaap:ProfitLoss |
| Net income | 6 months, 2014-01-01 to 2014-06-30 | $663.0m | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2014-04-01 to 2014-06-30 | $0.40 | us-gaap:EarningsPerShareBasicAndDiluted |
| Diluted EPS | 6 months, 2014-01-01 to 2014-06-30 | $0.79 | us-gaap:EarningsPerShareBasicAndDiluted |
| Operating cash flow | 3 months, 2014-04-01 to 2014-06-30 | $348.8m | us-gaap:NetCashProvidedByUsedInOperatingActivitiesContinuingOperations |
| Operating cash flow | 6 months, 2014-01-01 to 2014-06-30 | $683.5m | us-gaap:NetCashProvidedByUsedInOperatingActivitiesContinuingOperations |
| Capital expenditure | 3 months, 2014-04-01 to 2014-06-30 | $375.6m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Capital expenditure | 6 months, 2014-01-01 to 2014-06-30 | $699.4m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2014-04-01 to 2014-06-30 | $83.3m | us-gaap:PaymentsOfDividendsCommonStock |
| Dividends paid | 6 months, 2014-01-01 to 2014-06-30 | $183.4m | us-gaap:PaymentsOfDividendsCommonStock |
| Share repurchases | 3 months, 2014-04-01 to 2014-06-30 | $13.0m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Share repurchases | 6 months, 2014-01-01 to 2014-06-30 | $65.5m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2014-06-30 | $1.34bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2014-06-30 | $3.31bn | us-gaap:AssetsCurrent |
| Total assets | at 2014-06-30 | $11.51bn | us-gaap:Assets |
| Current liabilities | at 2014-06-30 | $1.03bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2014-06-30 | $4.01bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2014-06-30 | $200.0m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2014-06-30 | $5.95bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 72,197 characters.

*The following discussion provides information that management believes is relevant to an assessment and understanding of the condensed consolidated financial condition and results of operations of Southern Copper Corporation and its subsidiaries (collectively, “SCC” the “Company” “our” and “we”). This item should be read in conjunction with our interim unaudited Condensed Consolidated Financial Statements and the notes thereto included in this quarterly report. Additionally, the following discussion and analysis should be read in conjunction with the Management Discussion and Analysis of Financial Condition and Results of Operations and the Consolidated Financial Statements included in Part II of our annual report on Form 10-K for the year ended December 31, 2013.*

EXECUTIVE OVERVIEW

Business: Our business is primarily the production and sale of copper. In the process of producing copper, a number of valuable metallurgical by-products are recovered, which we also produce and sell. Market forces outside of our control largely determine the sale prices for our products. Our management, therefore, focuses on value creation through copper production, cost control, production enhancement and maintaining a prudent capital structure to remain profitable. We endeavor to achieve these goals through capital spending programs, exploration efforts and cost reduction programs. Our aim is to remain profitable during periods of low copper prices and to maximize financial performance in periods of high copper prices.

We are one of the world’s largest copper mining companies in terms of production and sales with our principal operations in Peru and Mexico. We also have active ongoing exploration programs in Chile, Argentina and Ecuador. In addition to copper we produce significant amounts of other metals, either as a by-product of the copper process or in a number of dedicated mining facilities in Mexico.

Outlook: Various key factors will affect our outcome. These include, but are not limited to, some of the following:

- Changes in copper and molybdenum prices: The average LME copper price was $3.14 per pound in the first half of 2014, 8.2% lower than in the first half of 2013. The average silver price in the first half of 2014 also decreased 24.5% from the average price in the first half of 2013. Meanwhile, average molybdenum and zinc prices in the first half of 2014 increased 5.9% and 5.7%, respectively, from the average prices in the first half of 2013. During the first half of 2014 per pound LME spot copper prices ranged from $2.92 to $3.37. The LME spot price for copper closed at $3.15 per pound on June 30, 2014.
- Sales structure: In the first half of 2014 approximately 76% of our revenue came from the sale of copper, 10% from molybdenum, 5% from silver, 4% from zinc and 5% from various other products, including gold, sulfuric acid and other materials.
- Copper: During the second quarter of 2014, we have seen relative softness in copper prices, which have decreased by about 4% when compared to the first quarter of this year. Simultaneously however, we have been seeing the copper market’s future fundamentals improving positively. As of July 23, 2014, inventories at the three major warehouses (LME, COMEX and Shanghai) have decreased by 221,000 tons or 46% from their position at the beginning of 2014.

As we have indicated in the past, we believe copper demand is improving due, in large part, to the synchronized economic recovery of the United States, Europe and Japan, which together represent about 54% of the world GDP and consume directly about 31% of the world’s refined copper production.

Regarding the world’s main copper consumer, China, we believe that recent Chinese Strategic Reserve purchases as well as an expected copper demand rebound of this country for the second half of this year will support global copper demand growth in 2014.

On the supply side, we think that several structural factors, such as scrap scarcity, delays in projects startups, technical problems, labor unrest and other difficulties will continue to affect supply from new projects and existing operations, as well as scrap production.

As a consequence of these factors, we think there is now a small probability of a surplus market for 2014.

Molybdenum: Our most significant by-product, represented 10% of our sales in the first half of 2014. In the second quarter we saw a growing demand for molybdenum in Europe that has supported prices 35% higher than the first quarter of 2014. This price increase seems to be contrary with the outlook of higher supply due to a 10% worldwide growth coming from our Buenavista operation, as well as from Sierra Gorda, Toromocho and Caserones, among other projects.

Even though the current scenario for molybdenum prices is not positive, it is important to note that about 50% of the supply of this metal comes from primary or dedicated molybdenum mines, which have a cash cost in the range of $9-$12 per pound. This creates a natural barrier for the molybdenum market to adjust production volume and thereby protect low cost secondary molybdenum producers such as our Company.

Silver: Represented 5% of our sales in the first half of 2014. Silver prices averaged $20.04 per ounce in the first half of 2014, 24.5% lower than its price in the first half of 2013. We believe that silver prices will have strong support due to its industrial uses as well as being perceived as a value shelter in times of economic uncertainty.

Zinc: Represented 4% of our sales in the first half of 2014. We also believe that zinc has very good long term fundamentals due to its significant industrial consumption and expected mine production shutdowns. In the last 12 months, zinc inventories have decreased significantly, improving this market´s fundamentals. We are expecting an increasing price scenario for zinc in the next few years.

- Production: For 2014, we are expecting to produce 672,400 tons of copper from our mines. The construction of the new 120,000 ton capacity SX-EW III plant at Buenavista was completed and started commercial production this June. We expect it to be at full capacity by the end of the third quarter of 2014 and contribute to our 2014 production with 53,400 tons.

We expect to produce 22,000 tons of molybdenum in 2014, 10.6% more than our 2013 production and a new Company record.

We now expect to produce and sell 15 million ounces of silver and produce 82,000 tons of zinc in 2014. This is a reduction from our previous outlook, due to lower silver and zinc grades and some temporary disruptions at our zinc mines.

- Cost: Our operating costs and expenses for the first half 2014 and 2013 were as follows ($ in millions):

|  | 2014 | 2013 | Variance $% |  |
| --- | ---: | ---: | ---: | ---: |
| Operating costs and expenses | $1,681.6 | $1,692.9 | $(11.3) | (0.7)% |

The decrease was largely due to lower cost of sales, as result of a temporary build-up of copper inventory as well as lower sales of metal purchased from third parties.

- Capital Investments. In the first six months of 2014, we spent $699.4 million on capital expenditures, which represents 106% of net income. We continue with the development of our capital expansion program which aims to increase copper production capacity by approximately 87% from 630,000 tons in 2013 to 1,175,000 tons by 2017.
- Tax changes in Peru: On July 12, 2014, the Peruvian government enacted a new law with certain tax and administrative changes in order to promote investments in Peru. The law includes several tax and environmental changes that could positively affect our Company. Changes include providing more favorable terms for tax stability agreements for both new investments and for the inclusion of major expansions in these stability agreements. In addition, these proposals cap interest accumulations on some contested assessments and penalties. Other provisions provide for more flexibility in the implementation of environmental regulations.

KEY MATTERS:

We discuss below several matters that we believe are important to understand our results of operations and financial condition. These matters include (i) our earnings, (ii) our production, (iii) our “operating cash costs” as a measure of our performance, (iv) metal prices, (v) business segments, (vi) the effect of inflation and other local currency issues, and (vii) our capital investment and exploration program.

Earnings: The table below highlights key financial and operational data for our Company for the three and six months ended June 30, 2014 and 2013 (in millions, except per share amounts):

|  | Three months ended June 30, 2014 | 2013 | Variance | Six months ended June 30, 2014 | 2013 | Variance |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Net sales | $1,487 | $1,410 | $77 | $2,842 | $3,033 | $(191) |
| Net income attributable to SCC | $337 | $373 | $(36) | $661 | $868 | $(207) |
| Earnings per share | $0.40 | $0.44 | $(0.04) | $0.79 | $1.03 | $(0.24) |
| Dividends per share | $0.10 | $0.20 | $(0.10) | $0.22 | $0.44 | $(0.22) |
| Pounds of copper sold | 354 | 331 | 23 | 684 | 675 | 9 |

Net sales and net income in the first six months of 2014 were lower than in the first six months of 2013 by $191 million and $207 million, respectively. These decreases were mainly the result of lower prices for copper and silver, partially offset by increases in molybdenum and zinc prices. Silver and zinc sales volume decreased in the first six months of 2014 by 21.8% and 1.9%, respectively, compared with the first six months of 2013, this was partially offset by higher sales volume of copper 1.2% and molybdenum 21.4%.

Production: The table below highlights mine production data for our Company for the three and six months ended June 30, 2014 and 2013:

|  | Three months ended June 30, 2014 | 2013 | Variance Volume% |  | Six months ended June 30, 2014 | 2013 | Variance Volume% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Copper (in million pounds) | 364.5 | 325.1 | 39.4 | 12.1% | 724.3 | 654.7 | 69.6 | 10.6% |
| Molybdenum (in million pounds) | 12.8 | 9.9 | 2.9 | 29.6% | 25.1 | 20.5 | 4.6 | 22.4% |
| Zinc (in million pounds) | 36.4 | 59.6 | (23.2) | (39.0)% | 82.3 | 111.4 | (29.1) | (26.1)% |
| Silver (in million ounces) | 3.2 | 3.4 | (0.2) | (4.7)% | 6.6 | 6.5 | 0.1 | 1.7% |

The table below highlights copper production data at each of our mines for the three and six months ended June 30, 2014 and 2013:

| COPPER (in million pounds) | Three Months Ended June 30, 2014 | 2013 | Variance Volume% |  | Six Months Ended June 30, 2014 | 2013 | Variance Volume% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Toquepala | 76.0 | 70.8 | 5.2 | 7.3% | 151.0 | 140.4 | 10.6 | 7.6% |
| Cuajone | 98.7 | 90.6 | 8.1 | 8.9% | 198.1 | 178.8 | 19.3 | 10.8% |
| La Caridad | 70.7 | 66.7 | 4.0 | 6.0% | 139.6 | 132.9 | 6.7 | 5.0% |
| Buenavista | 116.5 | 93.1 | 23.4 | 25.2% | 230.0 | 195.2 | 34.8 | 17.8% |
| IMMSA | 2.6 | 3.9 | (1.3) | (34.6)% | 5.6 | 7.4 | (1.8) | (24.7)% |
| Total mined copper | 364.5 | 325.1 | 39.4 | 12.1% | 724.3 | 654.7 | 69.6 | 10.6% |

Second quarter: Copper mine production in the second quarter of 2014 increased 12.1% to 364.5 million pounds compared with 325.1 million pounds in the second quarter of 2013. This increase was due to:

- Higher ore grades and recoveries at all our mines and higher production at the Buenavista mine due to the first commercial production of the new SX-EW III plant, which produced 1.7 million pounds,
- higher production at the Cuajone mine resulting from higher ore grades and the projects developed at this site,
- higher production at the Toquepala mine due to better ore grades and recoveries, and
- higher production at the La Caridad mine due to higher ore grades and recoveries, partially offset by
- lower production at IMMSA mines due to lower ore grades at each of their mines.

Molybdenum production increased 29.6% in the second quarter of 2014 compared to the second quarter of 2013 due to the contribution of 1.8 million pounds from the new Buenavista molybdenum plant and from higher production at our Peruvian mines, principally as a result of better grades.

Silver mine production decreased 4.7% in the second quarter of 2014 from the second quarter of 2013, principally as a result of lower production at our IMMSA mines, partially offset by an increase in production at the Buenavista mine and our Peruvian mines.

Zinc production decreased 39.0% in the second quarter of 2014 due to lower grades at all our IMMSA mines and lower production at the Charcas mine due to an accident that temporarily restricted production.

Six months: Copper mine production in the first six months of 2014 increased 10.6% to 724.3 million pounds compared with 654.7 million pounds in the same period of 2013. This increase was due to:

- Higher production at the Buenavista mine due to higher throughput at the concentrator and better ore grades and recoveries, as well as the first production from the new SX-EW III plant,
- higher production at the Cuajone mine resulting from higher throughput and higher ore grades from the HPGR production,
- higher production at the Toquepala mine due to better ore grades and recoveries, and
- higher production at the La Caridad mine due to better ore grades and recoveries, partially offset by
- lower production at IMMSA mines due to lower ore grades at all of their mines.

Molybdenum production increased 22.4% in the first six months of 2014 compared to the same period of 2013 due to our new Buenavista molybdenum plant´s contribution of 3.1 million pounds of molybdenum and higher production at our Peruvian mines, principally as a result of better grades.

Silver mine production had a slight increase of 1.7% in the first six months of 2014 from the same period of 2013, principally as a result of higher production at all our Peruvian mines and at the Buenavista mine, partially offset by lower production at the Charcas mine due to an incident that temporarily restricted production.

Zinc production decreased 26.1% in the first six months of 2014 due to lower grades at all our IMMSA mines and lower production at the Charcas mine due to an accident that temporarily restricted production.

Operating Cash Costs: An overall benchmark used by us and a common industry metric to measure performance is operating cash cost per pound of copper produced. Operating cash cost is a non-GAAP measure that does not have a standardized meaning and may not be comparable to similarly titled measures provided by other companies. This non-GAAP information should not be considered in isolation or as substitute for measures of performance determined in accordance with GAAP. A reconciliation of our operating cash cost per pound of copper produced to the cost of sales (exclusive of depreciation, amortization and depletion) as presented in the condensed consolidated statement of earnings is presented under the subheading “Non-GAAP Information Reconciliation” on pages 44 - 45. We disclose operating cash cost per pound of copper produced, both without and with the inclusion of by-product revenues.

We define ***operating cash cost per pound of copper produced without by-product revenues*** as cost of sales (exclusive of depreciation, amortization and depletion), plus selling, general and administrative charges, treatment and refining charges net of sales premiums; less the cost of purchased concentrates, workers’ participation and other miscellaneous charges, including royalty charges and the change in inventory levels; divided by total pounds of copper produced by our own mines.

We define ***operating cash cost per pound of copper produced with by-product revenues*** as operating cash cost per pound of copper produced, as defined in the previous paragraph, less by-product revenues and net revenue (loss) on sale of metal purchased from third parties.

In our calculation of operating cash cost per pound of copper produced, with by-product revenues, we credit against our costs the revenues from the sale of all our by-products, including, molybdenum, zinc, silver, gold, etc. and the net revenue (loss) on sale of metals purchased from third parties. We disclose this measure including the by-product revenues in this way because we consider our principal business to be the production and sale of copper. As part of our copper production process, much of our by-products are recovered. These by-products and the process of copper purchased from third parties are a marginal part of our production process and their sales value contribute to cover part of our fixed costs incurred. We believe that our Company is viewed by the investment community as a copper company, and is valued, in large part, by the investment community’s view of the copper market and our ability to produce copper at a reasonable cost.

We believe that both of these measures are useful tools for our management and our stakeholders. Our cash costs, without by-product revenues allow us to monitor our cost structure and address operating management areas of concern. The measure operating cash cost per pound of copper produced with by-product revenues is a common measure used in the copper industry and it is a useful management tool that allows us to track our performance and better allocate our resources. This measure is also used in our investment project evaluation process to determine a project’s potential contribution to our operations, its competitiveness and its relative strength in different price scenarios. The expected contribution of by-products is generally a significant factor used by the copper industry in determining whether to move forward with the development of a new mining project. As the price of our by-product commodities can have significant fluctuations from period to period, the value of its contribution to our costs can be volatile.

For further discussion please see our section of Operating cash costs in Part II, Item 7 of our Annual report on Form 10-K for the year ended December 31, 2013.

Our operating cash cost per pound of copper produced, with and without by-product revenues, is presented in the table below for the three and six months ended June 30, 2014 and 2013.

### Operating cash cost per pound of copper produced (1)

### (in millions, except cost per pound and percentages)

|  | Three Months Ended June 30, 2014 | 2013 | Variance Value% |  | Six Months Ended June 30, 2014 | 2013 | Variance Value% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Total operating cash cost without by-product revenues | $699.4 | $633.5 | $65.9 | 10.4% | $1,354.3 | $1,243.3 | $111.0 | 8.9% |
| Total by-products revenues | (374.3) | (303.9) | (70.4) | 23.2% | (671.6) | (633.8) | (37.8) | 6.0% |
| Total operating cash cost with by-products revenues | $325.1 | $329.5 | $(4.4) | (1.3)% | $682.7 | $609.5 | $73.2 | 12.0% |
| Total pounds of copper produced | 352.9 | 316.9 | 36.0 | 11.4% | 702.7 | 638.9 | 63.8 | 10.0% |
| Operating cash cost per pound without by-product revenues | $1.98 | $2.00 | $(0.02) | (1.0)% | $1.93 | $1.95 | $(0.02) | (1.0)% |
| Operating cash cost per pound with by-products revenues | $0.92 | $1.04 | $(0.12) | (11.5)% | $0.97 | $0.95 | $0.02 | 2.1% |

(1) This is a non-GAAP measure. Please see pages 44 - 45 for reconciliation to GAAP measure.

As seen on the table above, our cash cost without by-products revenues in the second quarter and the first six months of 2014 were two cents lower than in the same periods of 2013 mainly due to the diluting effect of higher production at all our open pit mines mainly from Buenavista. This increase production volume offset the cost inflation, which increased fuel, power, tires, reagents and other operating materials for our production process.

Our per pound cash cost for the three months ended June 30, 2014, when calculated with by-products revenues was 92 cents per pound compared with $1.04 per pound in the same period of 2013. The decrease was largely attributable to the increase in molybdenum sales due to the higher production from the new Buenavista molybdenum plant and higher market price which increased by 24.5% in the second quarter 2014 compared with the same period of 2013.

In addition, our per pound cash cost for the six months ended June 30, 2014 when calculated with by-products revenues was 97 cents per pound compared with 95 cents per pound in the same period of 2013. This increase of two cents per pound or 2.1% was result of lower by-products market prices except for molybdenum and zinc which partially offset the reduction together with an increase in molybdenum production.

Metal Prices: The profitability of our operations is dependent on, and our financial performance is significantly affected by, the international market prices for the products we produce, especially for copper, molybdenum, zinc and silver. Metal prices historically have been subject to wide fluctuations and are affected by numerous factors beyond our control. These factors, which affect each commodity to varying degrees, include international economic and political conditions, levels of supply and demand, the availability and cost of substitutes, inventory levels maintained by producers and others and, to a lesser degree, inventory carrying costs and currency exchange rates. In addition, the market prices of certain metals have on occasion been subject to rapid short-term changes due to economic concerns and financial investments.

We are subject to market risks arising from the volatility of copper and other metal prices. For the remaining six months of 2014, assuming that expected metal production and sales are achieved, that tax rates are unchanged, giving no effect to potential hedging programs, metal price sensitivity factors would indicate the following change in estimated net income attributable to SCC resulting from metal price changes:

|  | Copper | Molybdenum | Zinc | Silver |
| --- | ---: | ---: | ---: | ---: |
| Change in metal prices (per pound, except silver — per ounce) | $0.01 | $1.00 | $0.01 | $1.00 |
| Annual change in net income attributable to SCC (in millions) | $4.7 | $14.7 | $0.6 | $5.1 |

Business Segments: We view our Company as having three operating segments and manage on the basis of these segments. These segments are (1) our Peruvian operations, (2) our Mexican open-pit operations and (3) our Mexican underground operations, known as our IMMSA unit. Our Peruvian operations include the Toquepala and Cuajone mine complexes and the smelting and refining plants, industrial railroad and port facilities which service both mines. The Peruvian operations produce copper, with significant by-product production of molybdenum, silver and other material. Our Mexican open-pit operations include La Caridad and Buenavista mine complexes, the smelting and refining plants and support facilities which service both mines. The Mexican open-pit operations produce copper, with significant by-product production of molybdenum, silver and other material. Our IMMSA unit includes five underground mines that produce zinc, lead, copper, silver and gold, a coal mine which produces coal and coke, and several industrial processing facilities for zinc and silver.

Segment information is included in our review of “Results of Operations” and also in Note 10 - “Segment and Related Information” of our condensed consolidated financial statements.

Inflation and Exchange Rate Effect of the Peruvian Nuevo Sol and the Mexican Peso: Our functional currency is the U.S. dollar and our revenues are primarily denominated in U.S. dollars. Significant portions of our operating costs are denominated in Peruvian Nuevo sol and Mexican pesos. Accordingly, when inflation and currency devaluation/appreciation of the Peruvian currency and Mexican currency occur, our operating results can be affected. In recent years we believe such changes have not had a material effect on our results and financial position. Please see Item 3 “Quantitative and Qualitative Disclosures about Market Risk” for more detailed information.

Capital Investment Programs: We made capital investments of $375.6 million and $699.4 million for the three and six months ended June 30, 2014, compared with $385.5 million and $702.3 million in the comparable periods of 2013, respectively. In general, the capital investments and investment projects described below are intended to increase production, decrease costs or address social and environmental commitments.

Set forth below are descriptions of some of our current expected capital investment programs. We expect to meet the cash requirements for these projects from cash on hand, internally generated funds and from additional external financing, if required. All capital spending plans will continue to be reviewed and adjusted to respond to changes in the economy or market conditions.

Projects in Mexico:

Buenavista Projects: The *new copper molybdenum concentrator* has an annual production capacity of 188,000 tons of copper and 2,600 tons of molybdenum. In addition, the project will produce annually 2.3 million ounces of silver and 21,000 ounces of gold. The total capital budget of the project is $1,383.6 million and through June 30, 2014 has an 80.7% progress with an investment of $783.1 million. The project is expected to be completed in the first half of 2015. All major equipment is on site and 72.5% has been installed.

Regarding *the mine equipment acquisition* for the Buenavista expansion, through June 30, 2014 we have invested $510.8 million and have received 61 400-ton capacity trucks, seven shovels and eight drills required for the mine expansion.

The first copper cathode at our *SX-EW III* plant was produced in June. The first of three solvent extraction trains started operation, as well as 50% of our electro winning plant. Full capacity is expected to be reached by the end of the third quarter of 2014, with an annual production of 120,000 tons per year. The total capital budget for the project is $444 million of which we have invested 99% through June 30, 2014.

The *crushing, conveying and spreading system for leachable ore project (Quebalix IV)* will increase production by improving SX-EW copper recovery, reducing processing time and hauling costs. It has a crushing and conveying capacity of 80 million tons per year and is expected to be completed in the fourth quarter of 2015. The project has a 37.6% progress with an investment of $70.2 million out of the approved capital budget of $340 million. The mobile stacking conveyor and the overland conveyor contracts have been assigned.

The remaining projects to complete the $3.4 billion budgeted program include important investments in infrastructure (power lines and substations, water supply, tailings dam, mine equipment shops, internal roads and others).

Angangueo: The project is moving forward as scheduled to develop this underground polymetallic deposit in Michoacan, Mexico. With an estimated investment of $174.7 million, Angangueo includes a concentrator plant which will have an estimated average annual metal content production of 10,400 tons of copper and 7,000 tons of zinc in the first seven years. Over the life of the mine, average annual concentrate production is expected to contain 2.4 million ounces of silver and 1,500 ounces of gold. The project is scheduled to begin production in the first half of 2015. Through June 30, 2014 we have spent $22.7 million on the project. In the second quarter of 2014, we executed additional diamond drilling at the Descubridora vein in order to further define our ore reserves. In addition, we initiated the new environmental study for this project.

Projects in Peru:

Toquepala Projects: Through June 30, 2014, we have invested a total $309.8 million on Toquepala projects. These projects include the construction of a new crusher and conveyor belt system to replace current mine rail haulage, which we expect will reduce annual operating cost.

*Toquepala expansion project*. On July 1, 2014, we received the comments from the authorities and stakeholders related to the EIA of the Toquepala concentrator expansion, which we expect to answer during the third quarter of 2014. We expect to receive the EIA approval by year end and continue developing this project. The Toquepala concentrator expansion will increase annual production capacity by 100,000 tons of copper and 3,100 tons of molybdenum.

Cuajone Projects: Through June 30, 2014, we have invested $38.3 million of a budget of $45 million on the *HPGR project*, which will produce a more finely crushed material. This project continues in the ramping up stage and we expect to reach full capacity during the third quarter 2014. The project will generate cost savings, improve copper recovery and reduce power consumption in the crushing process. Through June 2014, the implementation of the HPGR project and the variable cut-off ore grade project, implemented in 2013, has produced incremental production of approximately 13,000 tons of copper. When fully operational we expect an annual increment in copper production of 22,000 tons.

The project to *improve slope stability at the south area of the Cuajone mine*, will remove approximately 148 million tons of waste material, over a three-year period, in order to improve mine design without reducing current production level. The mine equipment acquired includes one shovel, five 400-ton capacity trucks, one drill and auxiliary equipment which will be reallocated to our mine operations once the project is finished. Besides preparing the mine for the future, this investment will avoid a reduction in average ore grade. At June 30, 2014, we have invested $62.0 million of a total budget of $65.1 million.

Tia Maria project: we have responded to the comments raised by the governmental authorities and stakeholders and are waiting for the final approval of our EIA which we expect during the third quarter of 2014. Once received, we will be able to move forward with this important project. For further developments please see Note 14.

This project will represent an investment of approximately $1.4 billion and will produce 120,000 tons of copper cathodes using state of the art technology which would be compliant with the highest international environmental and sustainable development standards. The project is currently expected to generate 3,500 jobs during the construction phase. When in operation, Tia Maria would directly employ 600 workers and indirectly another 2,000. Through its expected twenty-years of life, the project related services would create significant business opportunities in the Arequipa region.

In addition, the Company intends to implement social responsibility programs in the Arequipa region similar to those established in the communities near its other operations in Peru.

Tailings disposal at Quebrada Honda: This project increases the height of the existing Quebrada Honda dam to impound future tailings from the Toquepala and Cuajone mills and will extend the expected life of this tailings facility by 25 years. The first stage and construction of the drainage system for the lateral dam is finished. We are preparing bidding documents for the second stage that includes engineering and procurement to improve and increase the dam’s embankment. The project has a total budgeted cost of $66.0 million with $51.1 million invested through June 30, 2014.

#### Potential projects

We have a number of other projects that we may develop in the future. We evaluate new projects on the basis of our long-term corporate objectives, expected return on investment, environmental concerns, required investment and estimated production, among other considerations. All capital spending plans will continue to be reviewed and adjusted to respond to changes in the economy or market conditions.

El Arco: El Arco is a world class copper deposit in the central part of the Baja California peninsula, with ore reserves over 1.5 billion tons with an ore grade of 0.416% and 0.14 grams of gold per ton. In 2010, we concluded the feasibility study and an investment of $56.4 million was approved for land acquisition required for the project. This project, when developed, is expected to produce 190,000 tons of copper and 105,000 ounces of gold annually. Through June 30, 2014 we have invested $40.8 million on studies, exploration and land acquisition for the project. In 2014, we expect to continue investing in land acquisition and exploration. In addition, we will begin an engineering study to determine the best way to optimize the investment in the project.

The above information is based on estimates only. We cannot make any assurances that we will undertake any of these projects or that the information noted is accurate.

ACCOUNTING ESTIMATES

Our discussion and analysis of financial condition and results of operations, as well as quantitative and qualitative disclosures about market risks, are based upon our condensed consolidated financial statements, which have been prepared in accordance with U.S. GAAP. Preparation of these condensed consolidated financial statements requires our management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosures of contingent assets and liabilities at the date of the financial statements, and the reported amounts of revenues and expenses during the reporting period. We make our best estimate of the ultimate outcome for these items based on historical trends and other information available when the financial statements are prepared. Changes in estimates are recognized in accordance with the accounting rules for the estimate, which is typically in the period when new information becomes available to management. Areas where the nature of the estimate makes it reasonably possible that actual results could materially differ from amounts estimated include: ore reserves, revenue recognition, estimated mine stripping ratios, leachable material and related amortization, the estimated useful lives of fixed assets, asset retirement obligations, litigation and contingencies, valuation allowances for deferred tax assets, tax positions, fair value of financial instruments and inventory obsolescence. We base our estimates on historical experience and on various other assumptions that we believe to be reasonable under the circumstances. Actual results may differ from these estimates under different assumptions or conditions.

RESULTS OF OPERATIONS

The following highlights our financial results for the three and six month periods ended June 30, 2013 and 2012 (in millions):

|  | Three Months Ended June 30, 2014 | 2013 | Variance | Six Months Ended June 30, 2014 | 2013 | Variance |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Net sales | $1,487.4 | $1,410.2 | $77.2 | $2,841.8 | $3,033.2 | $(191.4) |
| Operating costs and expenses | (890.2) | (843.8) | (46.4) | (1,681.6) | (1,692.9) | 11.3 |
| Operating income | 597.2 | 566.4 | 30.8 | 1,160.2 | 1,340.3 | (180.1) |
| Non-operating income (expense) | (38.9) | (29.6) | (9.3) | (79.3) | (75.7) | (3.6) |
| Income before income taxes | 558.3 | 536.8 | 21.5 | 1,080.9 | 1,264.6 | (183.7) |
| Income taxes | (225.8) | (167.8) | (58.0) | (429.9) | (406.8) | (23.1) |
| Equity earnings of affiliate | 5.9 | 5.1 | 0.8 | 11.9 | 13.3 | (1.4) |
| Net income attributable to non-controlling interest | (1.1) | (1.4) | 0.3 | (2.3) | (3.0) | 0.7 |
| Net income attributable to SCC | $337.3 | $372.7 | $(35.4) | $660.6 | $868.1 | $(207.5) |

#### NET SALES

Net sales for the second quarter 2014 increased by $77.2 million, compared with the second quarter of 2013. The 5.5% increase in sales was principally due to the higher copper and molybdenum sales volume and higher molybdenum and zinc prices, partially offset by lower zinc and silver sales volume and lower copper and silver prices.

Net sales in the first six months of 2014 decreased by $191.4 million compared with the first six months of 2013. The 6.3% decrease was mainly the result of lower copper and silver prices and lower silver and zinc sales volume, partially offset by higher copper and molybdenum sales volume and higher molybdenum and zinc prices.

The table below outlines the average published market metals prices for our metals for the three and six month periods ended June 30, 2014 and 2013:

|  | Three Months Ended June 30, 2014 | 2013 | % Change | Six Months Ended June 30, 2014 | 2013 | % Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Copper ($ per pound — LME) | $3.08 | $3.24 | (4.9)% | $3.14 | $3.42 | (8.2)% |
| Copper ($ per pound — COMEX) | $3.10 | $3.25 | (4.6)% | $3.17 | $3.43 | (7.6)% |
| Molybdenum ($ per pound) (1) | $13.45 | $10.80 | 24.5% | $11.69 | $11.04 | 5.9% |
| Zinc ($ per pound — LME) | $0.94 | $0.83 | 13.3% | $0.93 | $0.88 | 5.7% |
| Silver ($ per ounce —COMEX) | $19.62 | $23.10 | (15.1)% | $20.04 | $26.56 | (24.5)% |

(1) Platt´s Metals Week Dealer Oxide

The table below provides our metal sales as a percentage of our total net sales:

|  | Three Months Ended June 30, 2014 | 2013 | Six Months Ended June 30, 2014 | 2013 |
| --- | ---: | ---: | ---: | ---: |
| Copper | 75.1% | 77.6% | 76.4% | 77.4% |
| Molybdenum | 11.9% | 6.5% | 10.4% | 6.4% |
| Silver | 4.8% | 7.0% | 4.7% | 7.6% |
| Zinc | 3.5% | 3.6% | 3.7% | 3.3% |
| Other by-products | 4.7% | 5.3% | 4.8% | 5.3% |
| **Total** | 100.0% | 100.0% | 100.0% | 100.0% |

The table below provides our copper sales by type of product:

| Copper Sales (million pounds) | Three Months Ended June 30, 2014 | 2013 | Variance | Six Months Ended June 30, 2014 | 2013 | Variance |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Refined | 213.5 | 198.9 | 14.6 | 395.9 | 394.8 | 1.1 |
| SX-EW | 51.8 | 52.3 | (0.5) | 97.3 | 100.2 | (2.9) |
| Rod | 73.8 | 72.3 | 1.5 | 142.6 | 143.6 | (1.0) |
| Concentrates and other | 14.5 | 7.1 | 7.4 | 47.8 | 36.6 | 11.2 |
| **Total** | 353.6 | 330.6 | 23.0 | 683.6 | 675.2 | 8.4 |

#### OPERATING COSTS AND EXPENSES

The table below summarized the production cost structure by major components for the three and six months ended June 30, 2014 and 2013 as a percentage of total production cost:

|  | Three months ended June 30, 2014 | 2013 | Six months ended June 30, 2014 | 2013 |
| --- | ---: | ---: | ---: | ---: |
| Power | 18.0% | 19.9% | 19.0% | 20.2% |
| Labor | 14.1% | 16.5% | 14.2% | 16.1% |
| Fuel | 16.4% | 14.4% | 16.5% | 14.4% |
| Maintenance | 15.8% | 15.7% | 15.1% | 15.7% |
| Operating material | 18.6% | 17.9% | 18.7% | 18.2% |
| Other | 17.1% | 15.6% | 16.5% | 15.4% |
| Total | 100.0% | 100.0% | 100.0% | 100.0% |

Second quarter: Operating costs and expenses were $890.2 million in the second quarter of 2014, compared with $843.8 million in the comparable period of 2013. The increase of $46.4 million was primarily due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for the second quarter 2013 | $843.8 |
| Plus: |  |
| · Higher cost of sales (exclusive of depreciation, amortization and depletion), mainly due to higher fuel and power cost, partially offset by lower costs of metals purchased from third parties and lower inventory consumption, | 15.4 |
| · higher depreciation, amortization and depletion mainly at our Mexican operations as a result of the acquisition of mine equipment and the start-up of some projects, including the Quebalix III project and | 22.6 |
| · higher exploration expenses mainly at Ecuador, Argentina and at our Peruvian operations. | 10.5 |
| Less: |  |
| · Lower administrative expenses. | (2.1) |
| Operating cost and expenses for the second quarter 2014 | $890.2 |

Six months: Operating costs and expenses were $1,681.6 million in the six months ended June 30, 2014, compared with $1,692.9 million in the comparable period of 2013. The decrease of $11.3 million was primarily due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for the six months 2013 | $1,692.9 |
| Less: |  |
| · Lower cost of sales (exclusive of depreciation, amortization and depletion) mainly due to lower inventory consumption and lower cost of metals purchased from third parties, partially offset by higher production cost and | (65.5) |
| · lower administrative expenses. | (2.9) |
| Plus: |  |
| · Higher depreciation, amortization and depletion mainly at our Mexican operations as a result of the acquisition of mine equipment and the start-up of some projects, including the new molybdenum and SX-EW plants and the Quebalix III all at the Buenavista mine and | 42.4 |
| · higher exploration expenses mainly at Ecuador, Argentina and at our Peruvian operations. | 14.7 |
| Operating cost and expenses for the six months 2014 | $1,681.6 |

#### NON-OPERATING INCOME (EXPENSES)

Non-operating income and expense were an expense of $38.9 million and $79.3 million in the three and six month periods ended June 30, 2014, respectively, compared to an expense of $29.6 million and $75.7 million in the comparable periods of 2013.

Second quarter: The $9.3 million increase in non-operating expense in the second quarter of 2014 is principally due to:

- $ 6.1 million of higher other expenses mainly at our Peruvian operations and
- $ 13.5 million of higher capitalized interest, partially offset by
- $(16.5) million from the return in 2013 of funds from Coimolache expensed during the exploration stage of the Tantahuatay mine.

Six months: The increase of $3.6 million in non-operating expense in the first six months of 2014 is principally due to:

- $11.3 million of higher other expenses mainly at our Peruvian operations and
- $25.8 million of higher capitalized interest mainly at our Mexican operations due to higher capital investment at the Buenavista mine, partially offset by
- $(16.5) million from the partially return of funds in 2013 from Coimolache spent during the exploration stage of the Tantahuatay mine.

#### INCOME TAXES

|  | Six months ended June 30, 2014 | 2013 |
| --- | ---: | ---: |
| Provision for income taxes (in millions) | $429.9 | $406.8 |
| Effective income tax rate | 39.8% | 32.2% |

These provisions include income taxes for Peru, Mexico and the United States. The increase in the effective tax rate for the first half of 2014 from the same period in the prior year is primarily due to the new Mexican royalty tax instituted for 2014, which added 4.7% to the first six months effective tax rate. Other items that added to the increase in the effective tax rate are taxes allocable to dividends from Mexico which are taxed at a higher rate, the effect of capitalization of interest expense and the effect of the deduction for percentage depletion for U.S. tax purposes.

Royalty mining charge:

Peruvian operations: In 2011, the Peruvian congress approved an amendment to the mining royalty charge. The new mining royalty charge is based on operating income margins with graduated rates ranging from 1% to 12%, with a minimum royalty charge assessed at 1% of net sales. If the operating income margin is 10% or less, the royalty charge is 1% and for each 5% increment in the operating income margin, the royalty charge rate increases by 0.75%, up to a maximum of 12%. The minimum royalty charge assessed at 1% of net sales is recorded as cost of sales; those amounts assessed against operating income are included in the income tax provision. We have accrued $14.4 million and $17.7 million of royalty charge in the first six months of 2014 and 2013, respectively, of which $2.1 million and $5.0 million, respectively, were included in income taxes.

Mexican Operations: In December 2013, the Mexican government enacted a new law which, among other things, established a mining royalty charge of 7.5% on taxable EBITDA and an additional royalty charge of 0.5% on net sales value of gold, silver and platinum. These charges became effective January 2014 and we have accrued $46.6 million of royalty taxes as part of the income tax provision for the first half of 2014.

#### SEGMENT RESULT ANALYSIS

We have three segments: the Peruvian operations, the Mexican open-pit operations and the Mexican underground mining operations.

The table below presents information regarding the volume of our copper sales by segment for the three and six month periods ended June 30, 2014 and 2013:

| Copper Sales (million pounds): | Three Months Ended June 30, 2014 | 2013 | Variance Value% |  | Six Months Ended June 30, 2014 | 2013 | Variance Value% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Peruvian operations | 167.4 | 157.5 | 9.9 | 6.3% | 334.5 | 319.7 | 14.8 | 4.6% |
| Mexican open-pit | 186.2 | 173.1 | 13.1 | 7.6% | 349.1 | 355.5 | (6.4) | (1.8)% |
| Mexican IMMSA unit | 4.4 | 4.7 | (0.3) | (6.4)% | 8.5 | 9.4 | (0.9) | (9.6)% |
| Other and intersegment elimination | (4.4) | (4.7) | 0.3 | (6.4)% | (8.5) | (9.4) | 0.9 | (9.6)% |
| Total | 353.6 | 330.6 | 23.0 | 6.9% | 683.6 | 675.2 | 8.4 | 1.2% |

The table below presents information regarding the volume of sales by segment of our significant by-products for the three and six month periods ended June 30, 2014 and 2013:

| By-product Sales (in million pounds except silver – in million ounces) Peruvian operations | Three Months Ended June 30, 2014 | 2013 | Variance Value% |  | Six Months Ended June 30, 2014 | 2013 | Variance Value% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Molybdenum contained in concentrates | 4.7 | 3.8 | 0.9 | 24.8% | 9.5 | 7.2 | 2.3 | 31.9% |
| Silver | 0.9 | 0.9 | — | — | 1.6 | 1.7 | (0.1) | (4.2)% |
| Mexican open-pit |  |  |  |  |  |  |  |  |
| Molybdenum contained in concentrates | 8.1 | 6.1 | 2.0 | 32.4% | 15.5 | 13.4 | 2.1 | 15.7% |
| Silver | 2.0 | 2.7 | (0.7) | (25.9)% | 3.6 | 5.6 | (2.0) | (36.3)% |
| Mexican IMMSA unit |  |  |  |  |  |  |  |  |
| Zinc — refined and in concentrate | 51.9 | 55.9 | (4.0) | (7.9)% | 105.6 | 107.6 | (2.0) | (1.9)% |
| Silver | 1.2 | 1.3 | (0.1) | (2.6)% | 2.6 | 2.4 | 0.2 | 9.5% |
| Other and intersegment elimination |  |  |  |  |  |  |  |  |
| Silver | (0.5) | (0.5) | — | — | (1.0) | (1.0) | — | — |
| Total by-product sales |  |  |  |  |  |  |  |  |
| Molybdenum contained in concentrates | 12.8 | 9.9 | 2.9 | 29.5% | 25.0 | 20.6 | 4.4 | 21.0% |
| Zinc — refined and in concentrate | 51.9 | 55.9 | (4.0) | (7.9)% | 105.6 | 107.6 | (2.0) | (1.9)% |
| Silver | 3.6 | 4.4 | (0.8) | (16.2)% | 6.8 | 8.7 | (1.9) | (21.6)% |

Sales Value per Segment:

*(in millions)*

|  | Three Months Ended June 30, 2014 Mexican Open-pit | Mexican IMMSA Unit | Peruvian Operations | Corporate & Elimination | Consolidated |
| --- | ---: | ---: | ---: | ---: | ---: |
| Copper | $588.7 | $10.6 | $529.2 | $(10.9) | $1,117.6 |
| Molybdenum | 114.6 | — | 62.9 | — | 177.5 |
| Zinc | — | 51.6 | — | — | 51.6 |
| Silver | 39.7 | 23.1 | 17.9 | (9.1) | 71.6 |
| Other | 29.3 | 24.6 | 17.6 | (2.4) | 69.1 |
| Total | $772.3 | $109.9 | $627.6 | $(22.4) | $1,487.4 |

38

*(in millions)*

|  | Three Months Ended June 30, 2013 Mexican Open-pit | Mexican IMMSA Unit | Peruvian Operations | Corporate & Elimination | Consolidated |
| --- | ---: | ---: | ---: | ---: | ---: |
| Copper | $573.0 | $13.7 | $520.9 | $(13.7) | $1,093.9 |
| Molybdenum | 57.0 | — | 34.2 | — | 91.2 |
| Zinc | — | 50.2 | — | — | 50.2 |
| Silver | 60.4 | 27.3 | 21.1 | (9.7) | 99.1 |
| Other | 33.7 | 24.2 | 19.9 | (2.0) | 75.8 |
| Total | $724.1 | $115.4 | $596.1 | $(25.4) | $1,410.2 |

*(in millions)*

|  | Six Months Ended June 30, 2014 Mexican Open-pit | Mexican IMMSA Unit | Peruvian Operations | Corporate & Elimination | Consolidated |
| --- | ---: | ---: | ---: | ---: | ---: |
| Copper | $1,106.8 | $22.4 | $1,063.6 | $(22.7) | $2,170.1 |
| Molybdenum | 187.4 | — | 108.1 | — | 295.5 |
| Zinc | — | 104.7 | — | — | 104.7 |
| Silver | 70.7 | 49.9 | 32.1 | (18.0) | 134.7 |
| Other | 55.4 | 53.4 | 34.1 | (6.1) | 136.8 |
| Total | $1,420.3 | $230.4 | $1,237.9 | $(46.8) | $2,841.8 |

*(in millions)*

|  | Six Months Ended June 30, 2013 Mexican Open-pit | Mexican IMMSA Unit | Peruvian Operations | Corporate & Elimination | Consolidated |
| --- | ---: | ---: | ---: | ---: | ---: |
| Copper | $1,236.6 | $28.7 | $1,111.7 | $(28.7) | $2,348.3 |
| Molybdenum | 129.2 | — | 66.1 | — | 195.3 |
| Zinc | — | 100.8 | — | — | 100.8 |
| Silver | 148.8 | 60.4 | 44.4 | (24.0) | 229.6 |
| Other | 72.1 | 47.4 | 44.4 | (4.7) | 159.2 |
| Total | $1,586.7 | $237.3 | $1,266.6 | $(57.4) | $3,033.2 |

The geographic breakdown of the Company’s sales is as follows (in millions):

|  | Three Months Ended June 30, 2014 | 2013 | Six Months Ended June 30, 2014 | 2013 |
| --- | ---: | ---: | ---: | ---: |
| Mexico | $379.1 | $400.3 | $718.0 | $847.2 |
| United States | 304.1 | 297.4 | 580.9 | 643.8 |
| Asia | 233.8 | 156.0 | 494.4 | 431.8 |
| Europe | 215.3 | 252.5 | 401.6 | 470.0 |
| Chile | 136.4 | 86.2 | 228.8 | 183.1 |
| Brazil | 100.9 | 116.9 | 200.7 | 236.5 |
| Peru | 75.8 | 68.9 | 146.8 | 167.8 |
| Other countries | 42.0 | 32.0 | 70.6 | 53.0 |
| Total | **$1,487.4** | **$1,410.2** | **$2,841.8** | **$3,033.2** |

#### Peruvian Operations:

The following table sets forth net sales, operating cost and expenses and operating income for our Peruvian operations segment, for the three and six months ended June 30, 2014 and 2013 (in millions):

*(in millions)*

|  | Second Quarter 2014 | 2013 | Variance Value% |  | Six Months 2014 | 2013 | Variance Value% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Net sales | $627.6 | $596.1 | $31.5 | 5.3% | $1,237.9 | $1,266.6 | $(28.7) | (2.3)% |
| Operating costs and expenses | (412.5) | (375.5) | (37.0) | 9.9% | (795.9) | (744.5) | (51.4) | 6.9% |
| Operating income | $215.1 | $220.6 | $(5.5) | (2.5)% | $442.0 | $522.1 | $(80.1) | (15.3)% |

39

Second quarter: Net sales in the second quarter of 2014 were $627.6 million, compared with $596.1 million in the second quarter of 2013. The increase of $31.5 million was primarily the result of higher copper, molybdenum and silver sales volume, partially offset by lower prices.

Operating costs and expenses in the second quarter of 2014 increased by $37.0 million to $412.5 million from $375.5 million in the second quarter of 2013, primarily due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for the second quarter 2013 | $375.5 |
| Plus: |  |
| · Higher cost of sales (exclusive of depreciation, amortization and depletion) mainly due to higher production cost and higher inventory consumption, partially offset by lower worker´s participation, | 29.5 |
| · higher depreciation, amortization and depletion mainly due to the acquisition of mine equipment and | 6.2 |
| · higher exploration expenses. | 3.3 |
| Less: |  |
| · Lower selling, general and administrative expenses. | (2.0) |
| Operating cost and expenses for the second quarter 2014 | $412.5 |

Six months: Net sales in the first six months of 2014 were $1,237.9 million, compared with $1,266.6 million in the first six months of 2013. The decrease of $28.7 million was mainly the result of lower prices for copper and silver, partially offset by higher sales volume of copper and molybdenum. Copper sales volume increased by 14.8 million pounds and molybdenum by 2.3 million pounds.

Operating costs and expenses in the first six months of 2014 increased by $51.4 million to $795.9 million from $744.5 million in the first six months of 2013, primarily due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for the six months 2013 | $744.5 |
| Plus: |  |
| · Higher cost of sales (exclusive of depreciation, amortization and depletion) mainly due to higher production cost and higher inventory consumption partially offset by lower workers participation, | 39.5 |
| · higher depreciation, amortization and depletion due to the acquisition of mine equipment and other assets, and | 12.0 |
| · higher exploration expenses | 2.8 |
| Less: |  |
| · Lower selling, general and administrative expenses. | (2.9) |
| Operating cost and expenses for the six months 2014 | $795.9 |

#### Mexican Open-pit Operations:

The following table sets forth net sales, operating cost and expenses and operating income for our Mexican open-pit operations segment for the three and six months ended June 30, 2014 and 2013 (in millions):

*(in millions)*

|  | Second quarter 2014 | 2013 | Variance Value% |  | Six Months 2014 | 2013 | Variance Value% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Net sales | $772.3 | $724.1 | $48.2 | 6.7% | $1,420.3 | $1,586.7 | $(166.4) | (10.5)% |
| Operating costs and expenses | (376.8) | (390.0) | 13.2 | (3.4)% | (670.4) | (820.6) | 150.2 | (18.3)% |
| Operating income | $395.5 | $334.1 | $61.4 | 18.4% | $749.9 | $766.1 | $(16.2) | (2.1)% |

Second quarter: Net sales in the second quarter of 2014 were $772.3 million, compared to $724.1 million in the second quarter of 2013. The increase of $48.2 million was due to higher copper and molybdenum sales volume and higher molybdenum and zinc prices, partially offset by lower copper and silver sales prices and lower silver sales volume. Copper and molybdenum sales volume increased by 13.1 million pounds and 2.0 million pounds, respectively, while silver sales volume decreased by 0.7 million ounces.

Operating costs and expenses in the second quarter of 2014 decreased by $13.2 million from the comparable 2013 period, primarily due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for the second quarter 2013 | $390.0 |
| Less: |  |
| · Lower cost of sales (exclusive of depreciation, amortization and depletion) mainly due to lower cost of material purchased from third parties and lower inventory consumption, partially offset by, higher production cost. | (24.9) |
| Plus: |  |
| · Higher depreciation, amortization and depletion mainly due to the start-up of the molybdenum and SX-EW plants at the Buenavista mine and other equipment placed in service. | 11.7 |
| Operating cost and expenses for the second quarter 2014 | $376.8 |

Six months: Net sales in the first six months of 2014 were $1,420.3 million, compared to $1,586.7 million in the first six months of 2013. The decrease of $166.4 million was due to lower copper and silver prices and sales volume, partially offset by higher molybdenum sales volumes and prices. Copper sales volume decreased 6.4 million pounds and silver decreased 2.0 million ounces while molybdenum sales volume increased by 2.1 million pounds.

Operating costs and expenses in the first six months of 2014 decreased by $150.2 million from the comparable 2013 period, primarily due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for the six months 2013 | $820.6 |
| Less: |  |
| · Lower cost of sales (exclusive of depreciation, amortization and depletion) due to lower metal purchased from third parties and lower inventory consumption partially offset by higher production cost and higher workers participation and | (176.1) |
| · lower selling, general, administrative and exploration expenses. | (0.2) |
| Plus: |  |
| · Higher depreciation, amortization and depletion due to the start-up of the molybdenum and SX-EW plant at Buenavista and other equipment placed in service. | 26.1 |
| Operating cost and expenses for the six months 2014 | $670.4 |

#### Mexican Underground Operations (IMMSA):

The following table sets forth net sales, operating cost and expenses and operating income for our IMMSA segment, for the three and six months ended June 30, 2014 and 2013 (in millions):

*(in millions)*

|  | Second Quarter 2014 | 2013 | Variance Value% |  | Six Months 2014 | 2013 | Variance Value% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Net sales | $109.9 | $115.4 | $(5.5) | (4.8)% | $230.4 | $237.3 | $(6.9) | (2.9)% |
| Operating costs and expenses | (102.2) | (106.0) | 3.8 | (3.6)% | (203.2) | (195.7) | (7.5) | 3.8% |
| Operating income | $7.7 | $9.4 | $(1.7) | (18.1)% | $27.2 | $41.6 | $(14.4) | (34.6)% |

Second quarter: Net sales decreased by $5.5 million to $109.9 million in the second quarter of 2014 from $115.4 million in the second quarter of 2013. The decrease of 4.8% was primarily due to lower copper, zinc and silver sales volume and lower metal prices for copper and silver, partially offset by higher zinc prices.

Operating costs and expenses in the second quarter of 2014 decreased by $3.8 million from the comparable 2013 period. This decrease was primarily due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for the second quarter 2013 | $106.0 |
| Less: |  |
| · Lower cost of sales (exclusive of depreciation, amortization and depletion). | (5.3) |
| Plus: |  |
| · Higher depreciation, amortization and depletion mainly due to the acquisition of equipment and | 0.7 |
| · higher exploration expenses. | 0.8 |
| Operating cost and expenses for the second quarter 2014 | $102.2 |

41

Six months: Net sales in the first six months of 2014 were $230.4 million, compared to $237.3 million in the same period of 2013. This decrease of $6.9 million in net sales was primarily due to lower zinc and copper sales volume partially offset by higher zinc price. Zinc and copper sales volume decreased by 2.0 million and 0.9 million pounds, respectively.

Operating costs and expenses in the first six months of 2014 increased by $7.5 million from the comparable 2013 period. This increase was primarily due to:

|  |  |
| --- | ---: |
| Operating cost and expenses for the six months 2013 | $195.7 |
| Plus: |  |
| · Higher cost of sales (exclusive of depreciation, amortization and depletion) mainly due to higher cost of metal purchased from third parties and inventory consumption partially offset by, lower production cost and lower workers participation and | 6.1 |
| · higher depreciation, amortization and depletion due to the acquisition of mine equipment and other assets. | 1.8 |
| Less: |  |
| · Lower exploration expenses and | (0.3) |
| · lower selling, general and administrative expenses. | (0.1) |
| Operating cost and expenses for the six months 2014 | $203.2 |

#### Intersegment Eliminations and Adjustments:

The addition of the segments net sales, operating costs and expenses and operating income discussed above will not be directly equal to amounts in our condensed consolidated statement of earnings because the adjustments of intersegment operating revenues and expenses must be taken into account. Please see Note 10 — “Segments and related information” of the condensed consolidated financial statements.

### CASH FLOW

The following table shows the cash flow for the six months ended June 30, 2014 and 2013 (in millions):

|  | 2014 | 2013 | Variance |
| --- | ---: | ---: | ---: |
| Net cash provided from operating activities | $683.5 | $896.9 | $(213.4) |
| Net cash used in investing activities | $(776.1) | $(946.6) | $170.5 |
| Net cash used in financing activities | $(248.6) | $(441.7) | $193.1 |

### Net cash provided from operating activities:

The six months ended June 30, 2014 and 2013 change in operating activities include (in millions):

|  | 2014 | 2013 | Variance |
| --- | ---: | ---: | ---: |
| Net income | $663.0 | $871.1 | $(208.1) |
| Depreciation, amortization and depletion | 226.5 | 184.1 | 42.4 |
| Provision (benefit) for deferred income taxes | (56.8) | 10.7 | (67.5) |
| Other adjustments to net income | (12.8) | 5.6 | (18.4) |
| Operating assets and liabilities | (136.4) | (174.6) | 38.2 |
| Net cash provided from operating activities | $683.5 | $896.9 | $(213.4) |

Six months ended June 30, 2014: In the first six months of 2014 net income was $663.0 million, approximately 97.0% of the net operating cash flow. Significant items (deducted from), or added to net income, to arrive at operating cash flow included:

- $226.5 million of depreciation, amortization and depletion and
- $(56.8) million for deferred income tax benefit.

In addition, in the first six months of 2014 an increase in operating assets and liabilities reduced operating cash flow by $136.4 million and included:

- A decrease in cash of $49.9 million for an increase in accounts receivable value principally due to higher copper and molybdenum sales volume and higher molybdenum and zinc prices,
- A decrease in cash of $160.7 million from an increase in inventory primarily due to an increase of $100 million in long-term leachable material inventory, mainly at our Buenavista mine,
- An increase in cash due to higher accounts payable and accrued liabilities of $42.1 million was primarily due to higher income tax provision and
- The increase in other assets and liabilities of $32.2 million was primarily due to $26.6 million of increase in asset retirement obligations.

Six months ended June 30, 2013: In the first six months of 2013 net income was $871.1 million, approximately 97.1% of the net operating cash flow. Significant items (deducted from), or added to net income, to arrive at operating cash flow included:

- $184.1 million of depreciation, amortization and depletion,
- $10.7 million for deferred tax provision and
- $11.1 million of currency translation loss.

In addition, in the first six months of 2013 an increase in operating assets and liabilities reduced operating cash flow by $174.6 million and included:

- An increase in cash of $181.0 million from a reduction in accounts receivable, principally due to lower prices.
- A decrease in cash of $63.6 million for an increase in inventory which was primarily due to an increase in long-term leachable material inventory, mainly at our Buenavista mine,
- A decrease in cash of $187.9 million resulting from a decrease in accounts payable and accrued liabilities, primarily due to the income tax and workers’ participation payments as well as lower accrual due to the decrease in earnings and
- A decrease in cash of $104.0 million resulting from an increase in other assets and liabilities, primarily due to $53.9 million of prepaid labor costs related to the new Peruvian collective bargain agreements and $42.8 million of other prepaid expenses.

### Net cash used in investing activities:

Six months ended June 30, 2014: Net cash used for investing activities in the first six months of 2014 included $699.4 million for capital expenditures. The capital expenditures included:

- $544.0 million of investments at our Mexican operations:
- $227.3 million for the new Buenavista concentrator,
- $69.1 million for the SX-EW III project,
- $30.7 million for new projects infrastructure,
- $16.3 million for the Quebalix IV project,
- $18.3 million at our IMMSA unit, and
- $182.3 million for various other replacement expenditures.
- $155.4 million of investments at our Peruvian operations:
- $21.3 million for the Toquepala projects,
- $6.7 million for the Cuajone projects, and
- $127.4 million for various other replacement expenditures.

The first six months of 2014 investment activities included a net purchase of short-term investments of $81.6 million.

Six months ended June 30, 2013: Net cash used for investing activities in the first six months of 2013 included $702.3 million for capital expenditures. The capital expenditures included:

- $599.1 million of investments at our Mexican operations:
- $135.5 million for the Buenavista mine equipment,
- $145.3 million for the new Buenavista concentrator,
- $71.4 million for the SX-EW III project,
- $13.1 million for the new molybdenum plant at Buenavista,
- $31.4 million at our IMMSA unit, and
- $202.4 million for various other replacement expenditures
- $103.2 million of investments at our Peruvian operations:
- $25.9 million for the Toquepala projects,
- $ 6.1 million for the Cuajone projects and
- $71.2 million for various other replacement expenditures.

The first six months of 2013 investment activities also included a net purchase of short-term investments of $258.6 million and $13.3 million received from a loan to MGE.

### Net cash used in financing activities:

Net cash used for financing activities in the first six months of 2014 was $248.6 million, compared with $441.7 million in the first six months of 2013. The first six months of 2014 included a dividend distribution of $183.4 million, compared with a distribution of $372.0 million in the 2013 period. Also, the first six months of 2014 included the purchase of 2.3 million of our common shares at a cost of $65.5 million, compared with a repurchase in the 2013 period of 2.2 million shares of our common shares at a cost of $64.5 million.

LIQUIDITY AND CAPITAL RESOURCES

Dividends:

On May 8, 2014, we paid a quarterly dividend of 10 cents per share, totaling $83.3 million. On July 24, 2014, our Board of Directors authorized a quarterly dividend of 12 cents per share, expected to total $100 million, to be paid on August 28, 2014 to SCC shareholders of record at the close of business on August 15, 2014.

Capital Investment and Exploration Programs:

A discussion of our capital investment programs is an important part of understanding our liquidity and capital resources. We expect to meet the cash requirements for these capital expenditures from cash on hand, internally generated funds and from additional external financing if required. For information regarding our capital expenditure programs, please see the discussion under the caption “Capital Investment Programs” under this Item 2.

Contractual Obligations:

The following information updates our significant contractual obligations disclosed in Part II, Item 7 of our Annual report on Form 10-K for the year ended December 31, 2013 as filed with the SEC on February 27, 2014:

We have a commitment to purchase power for our Peruvian operations from Enersur through April 2017. In June 2014, we signed a power purchase agreement for 120MWh with the state company Electroperu S.A., under which Electroperu S.A. will supply energy for our Peruvian operations for twenty years starting on April 17, 2017 and ending on April 30, 2037. Also in July 2014, we signed a power purchase agreement for 120MWh with a private power generator Kallpa, under which Kallpa will supply energy for our Peruvian operations for ten years starting on April 17, 2017 and ending on April 30, 2027.

Also, we have a commitment to purchase power for our Mexican operations from MGE, a subsidiary of Grupo Mexico through 2032. See Note 13 “Commitment and Contingencies.”

As a result of the new Peruvian agreements, our contractual obligations to purchase energy increases as follows: 2017 - $511.7 million, 2018 - $454.7 million, 2019 and thereafter — $7,741.2 million. Amounts are based on our long-term estimated power costs, which are subject to change as energy generation costs change and our forecasted power requirements through the life of the agreements change.

Capital expenditure projects include committed purchase orders and executed contracts principally for our Mexican projects at the Buenavista mine.

NON-GAAP INFORMATION RECONCILIATION

#### Operating cash cost:

Following is a reconciliation of “Operating Cash Cost” (see page 31-32) to cost of sales (exclusive of depreciation, amortization and depletion) as reported in our condensed consolidated statement of earnings, in millions of dollars and dollars per pound in the table below.

|  | Three Months Ended June 30, 2014 $ million | $ per pound | Three Months Ended June 30, 2013 $ million | $ per pound | Six Months Ended June 30, 2014 $ million | $ per pound | Six Months Ended June 30, 2013 $ million | $ per pound |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Cost of sales (exclusive of depreciation, amortization and depletion) | $726.6 | $2.06 | $711.2 | $2.24 | $1,368.5 | $1.95 | $1,434.0 | $2.25 |
| Add: |  |  |  |  |  |  |  |  |
| Selling, general and administrative | 25.4 | 0.07 | 27.5 | 0.09 | 49.9 | 0.07 | 52.8 | 0.08 |
| Sales premiums, net of treatment and refining charges | (5.2) | (0.02) | (8.9) | (0.03) | (9.4) | (0.01) | (14.6) | (0.02) |
| Less: |  |  |  |  |  |  |  |  |
| Workers’ participation | (50.7) | (0.14) | (55.0) | (0.17) | (103.8) | (0.15) | (109.9) | (0.17) |
| Cost of metal purchased from third parties | (28.5) | (0.08) | (52.6) | (0.17) | (70.4) | (0.10) | (119.5) | (0.19) |
| Royalty charge and other, net | (19.2) | (0.05) | (12.8) | (0.04) | (30.7) | (0.04) | (43.5) | (0.07) |
| Inventory change | 51.0 | 0.14 | 24.1 | 0.08 | 150.2 | 0.21 | 44.0 | 0.07 |
| **Operating Cash Cost Without by-products revenues** | **$699.4** | **$1.98** | **$633.5** | **$2.00** | **$1,354.3** | **$1.93** | **$1,243.3** | **$1.95** |
| Add: |  |  |  |  |  |  |  |  |
| By-product revenues (1) | (371.0) | (1.05) | (298.7) | (0.94) | (666.0) | (0.95) | (624.2) | (0.98) |
| Net revenue on sale of metal purchased from third parties | (3.3) | (0.01) | (5.2) | (0.02) | (5.6) | (0.01) | (9.6) | (0.02) |
| Total by-product revenues | (374.3) | (1.06) | (303.9) | (0.96) | (671.6) | (0.96) | (633.8) | (1.00) |
| **Operating cash cost, with by-product revenues** | **$325.1** | **$0.92** | **$329.5** | **$1.04** | **$682.7** | **$0.97** | **$609.5** | **$0.95** |
| Total pounds of copper produced (in millions) | 352.9 |  | 316.9 |  | 702.7 |  | 638.9 |  |

(1) By-product revenues included in our presentation of operating cash cost contain the following:

|  | Three Months Ended June 30, 2014 $ million | $ per pound | Three Months Ended June 30, 2013 $ million | $ per pound | Six Months Ended June 30, 2014 $ million | $ per pound | Six Months Ended June 30, 2013 $ million | $ per pound |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Molydenum | $(187.8) | $(0.53) | $(96.6) | $(0.31) | $(312.5) | $(0.44) | $(207.8) | $(0.33) |
| Silver | (65.2) | (0.19) | (79.0) | (0.25) | (117.3) | (0.17) | (168.2) | (0.26) |
| Zinc | (51.9) | (0.15) | (50.5) | (0.16) | (104.7) | (0.15) | (101.1) | (0.16) |
| Sulfuric Acid | (32.6) | (0.09) | (36.7) | (0.12) | (64.0) | (0.09) | (76.4) | (0.12) |
| Gold and others | (33.5) | (0.09) | (35.9) | (0.10) | (67.5) | (0.10) | (70.7) | (0.11) |
| **Total** | **$(371.0)** | **$(1.05)** | **$(298.7)** | **$(0.94)** | **$(666.0)** | **$(0.95)** | **$(624.2)** | **$(0.98)** |

IMPACT OF NEW ACCOUNTING STANDARDS

On May 28, 2014, the FASB released the ASU 2014-09 “Revenue from Contracts with Customers” (Topic 606). The objective of the new revenue standard is to provide a single comprehensive revenue recognition model for all contracts with customers to improve comparability within industries, across industries and across capital markets.

The core principle of the standard is that the Company should recognize revenue to represent the transfer of promised goods or services to customers in an amount that reflects the consideration to which the Company expects to be entitled in exchange for those goods or services.

The Company should apply the following five steps to achieve the core principle:

Step 1: Identify the contract(s) with a customer.

Step 2: Identify the performance obligations (promises) in the contract.

Step 3: Determine the transaction price.

Step 4: Allocate the transaction price to the performance obligations in the contract.

Step 5: Recognize revenue when (or as) the Company satisfies a performance obligation.

The guidance also specifies the accounting for some costs to obtain or fulfill a contract with a customer. Additionally, the Company should disclose sufficient qualitative and quantitative information to enable users of financial statements to understand the nature, amount, timing, and uncertainty of revenue and cash flows arising from contracts with customers.

This revenue standard is effective for the first interim period within annual reporting periods beginning after December 15, 2016, and early adoption is not permitted. The Company should apply the amendments in this Update using either one of these two methods: retrospectively to each prior reporting period presented or retrospectively with the cumulative effect of initially applying this Update recognized at the date of initial application.

## Market risk

As filed, 7,031 characters.

### Commodity price risk:

We are subject to market risks arising from the volatility of copper and other metal prices. For the remaining six months of 2014, assuming that expected metal production and sales are achieved, that tax rates are unchanged, and giving no effects to potential hedging programs, metal price sensitivity factors would indicate the following change in estimated net income attributable to SCC resulting from metal price changes:

|  | Copper | Molybdenum | Zinc | Silver |
| --- | ---: | ---: | ---: | ---: |
| Change in metal prices (per pound except silver — per ounce) | $0.01 | $1.00 | $0.01 | $1.00 |
| Change in net earnings (in millions) | $4.7 | $14.7 | $0.6 | $5.1 |

### Foreign currency exchange rate risk:

Our functional currency is the U.S. dollar. Portions of our operating costs are denominated in Peruvian nuevos soles and Mexican pesos. Since our revenues are primarily denominated in U.S. dollars, when inflation or deflation in our Mexican or Peruvian operations is not offset by a change in the exchange rate of the nuevo sol or the peso to the dollar, our financial position, results of operations and cash flows could be affected by local cost conversion when expressed in U.S. dollars. In addition, the dollar value of our net monetary assets denominated in nuevos soles or pesos can be affected by exchange rate variances of the nuevo sol or the peso, resulting in a re-measurement loss or gain in our financial statements. Recent inflation and exchange rate variances are provided in the table below for the three and six month periods ended June 30, 2014 and 2013:

| Peru: | Three Months Ended June 30, 2014 | 2013 | Six Months Ended June 30, 2014 | 2013 |
| --- | ---: | ---: | ---: | ---: |
| Peruvian inflation rate | 0.8% | 0.7% | 2.2% | 1.7% |
| Initial exchange rate | 2.809 | 2.589 | 2.796 | 2.551 |
| Closing exchange rate | 2.796 | 2.783 | 2.796 | 2.783 |
| Appreciation/(devaluation) | 0.5% | (7.5)% | — | (9.1)% |
| Mexico: |  |  |  |  |
| Mexican inflation rate | (0.3)% | (0.3)% | 1.1% | 1.3% |
| Initial exchange rate | 13.084 | 12.355 | 13.077 | 13.010 |
| Closing exchange rate | 13.032 | 13.024 | 13.032 | 13.024 |
| Appreciation/(devaluation) | 0.4% | (5.4)% | 0.3% | (0.1)% |

### Change in monetary position:

Assuming an exchange rate variance of 10% at June 30, 2014 we estimate our net monetary position in Peruvian nuevo sol and Mexican peso would increase (decrease) our net earnings as follows:

*($ in millions)*

|  | Effect on net earnings |
| --- | ---: |
| Appreciation of 10% in U.S. dollar vs. nuevo sol | $(12.2) |
| Devaluation of 10% in U.S. dollar vs. nuevo sol | 14.9 |
| Appreciation of 10% in U.S. dollar vs. Mexican peso | (36.0) |
| Devaluation of 10% in U.S. dollar vs. Mexican peso | $44.0 |

### Open sales risk:

Our provisional copper and molybdenum sales contain an embedded derivative that is required to be separate from the host contract for accounting purposes. The host contract is the receivable from the sale of copper and molybdenum concentrates at prevailing market prices at the time of the sale. The embedded derivative, which does not qualify for hedge accounting, is marked to market through earnings each period prior to settlement.

At June 30, 2014, we have recorded provisionally priced sales of 31.3 million pounds of copper, at an average forward price of

$3.19 per pound. Also we have recorded provisionally priced sales of 8.5 million pounds of molybdenum at the June 30, 2014 market price of $13.30 per pound. These sales are subject to final pricing based on the average monthly LME or COMEX copper prices and Dealer Oxide molybdenum prices in the future month of settlement. See Note 5 to our condensed consolidated financial statements.

Provisional sales price adjustments included in accounts receivable and net sales at June 30, 2014 represented positive effects of $3.5 million for copper and $3.1 for molybdenum.

### Short-term Investment:

Short-term investments were as follows ($ in millions):

|  | At June 30, 2014 | At December 31, 2013 |
| --- | ---: | ---: |
| Trading securities | $284.4 | $202.6 |
| Weighted average interest rate | 1.80% | 3.78% |
| Available for sale | $5.5 | $5.7 |
| Weighted average interest rate | 0.41% | 0.42% |
| Total | $289.9 | $208.3 |

Trading securities: consist of bonds issued by public companies and are publicly traded. Each financial instrument is independent of the others. We have the intention to sell these bonds in the short-term.

Available for sale investments consist of securities issued by public companies. Each security is independent of the others and at June 30, 2014 and December 31, 2013, included corporate bonds and asset and mortgage backed obligations. As of June 30, 2014 and December 31, 2013, gross unrealized gains and losses on available for sale securities were not material.

Related to these investments we earned interest, which was recorded as interest income in the condensed consolidated statement of earnings. Also we redeemed some of these securities and recognized gains (losses) due to changes in fair value, which were recorded as other income (expense) in the condensed consolidated statement of earnings.

The following table summarizes the activity of these investments (in millions):

| Trading securities: | Three months ended June 30, 2014 | 2012 | Six months ended June 30, 2014 | 2012 |
| --- | ---: | ---: | ---: | ---: |
| Interest earned | $1.1 | $1.4 | $2.5 | $2.0 |
| Unrealized gain (loss) at the end of the period | $1.7 | $3.4 | $1.7 | $3.4 |
| **Available for sale:** |  |  |  |  |
| Interest earned | (\*) | (\*) | (\*) | (\*) |
| Investment redeemed | $0.2 | $0.4 | $0.2 | $0.4 |

(\*) Less than $0.1 million

Cautionary Statement:

Forward-looking statements in this report and in other Company statements include statements regarding expected commencement dates of mining or metal production operations, projected quantities of future metal production, anticipated production rates, operating efficiencies, costs and expenditures as well as projected demand or supply for the Company’s products. Actual results could differ materially depending upon factors including the risks and uncertainties relating to general U.S. and international economic and political conditions, the cyclical and volatile prices of copper, other commodities and supplies, including fuel and electricity, availability of materials, insurance coverage, equipment, required permits or approvals and financing, the occurrence of unusual weather or operating conditions, lower than expected ore grades, water and geological problems, the failure of equipment or processes to operate in accordance with specifications, failure to obtain financial assurance to meet closure and remediation obligations, labor relations, litigation and environmental risks as well as political and economic risk associated with foreign operations. Results of operations are directly affected by metal prices on commodity exchanges that can be volatile.

## Controls and procedures

As filed, 3,831 characters.

#### EVALUATION OF DISCLOSURE CONTROLS AND PROCEDURES

As of June 30, 2014, the Company conducted an evaluation under the supervision and with the participation of the Company’s Disclosure Committee and the Company’s management, including the Chief Executive Officer and Chief Financial Officer, of the effectiveness and the design and operation of the Company’s disclosure controls and procedures. Based on that evaluation, the Chief Executive Officer and the Chief Financial Officer have concluded that the Company’s disclosure controls and procedures are effective as of June 30, 2014, to ensure that information required to be disclosed in reports filed or submitted under the Exchange Act is:

1\. recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and

2\. accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

#### CHANGES IN INTERNAL CONTROLS OVER FINANCIAL REPORTING

There was no change in the Company’s internal controls over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934, as amended) that occurred during the quarter ended June 30, 2014 that has materially affected, or is reasonably likely to materially affect, the Company’s internal controls over financial reporting.

Report of Independent Registered Public Accounting Firm

To the Board of Directors and Shareholders of Southern Copper Corporation:

We have reviewed the accompanying condensed consolidated balance sheet of Southern Copper Corporation and subsidiaries (the “Company”) as of June 30, 2014, and the related condensed consolidated statements of earnings and comprehensive income for the three-month and six-month periods ended June 30, 2014 and 2013 and cash flows for the six-month periods ended June 30, 2014 and 2013. These interim financial statements are the responsibility of the Company’s management.

We conducted our review in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board (United States), the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.

Based on our reviews, we are not aware of any material modifications that should be made to the accompanying condensed consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.

We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheet of Southern Copper Corporation and subsidiaries as of December 31, 2013, and the related consolidated statements of earnings, comprehensive income, equity, and cash flows for the year then ended (not presented herein); and in our report dated February 26, 2014, we expressed an unqualified opinion on those consolidated financial statements. In our opinion, the information set forth in the accompanying condensed consolidated balance sheet as of December 31, 2013 is fairly stated, in all material respects, in relation to the consolidated balance sheet from which it has been derived.

Galaz, Yamazaki, Ruiz Urquiza S.C.

Member of Deloitte Touche Tohmatsu Limited

C.P.C. Miguel Angel Andrade Leven

Mexico City, Mexico

August 5, 2014

## Risk factors

As filed, 199 characters.

There have been no material changes to the risk factors disclosed in Part I, Item 1A of our Annual report on Form 10-K for the year ended December 31, 2013 as filed with the SEC on February 27, 2014.

Filed Aug 5, 2014.
Source: SEC EDGAR, the filing index for accession 0001104659-14-057009. Last ingested by Listed: Nov 4, 2026, 00:34 ET. No prices; not investment advice.