# TMC the metals Co Inc.: Form 10-Q for the period ended Sep 30, 2024

- Company: [TMC the metals Co Inc.](/companies/tmc.md) (CIK 1798562)
- Form: 10-Q
- Filed: 2024-11-15
- Accepted by EDGAR: Nov 15, 2024, 06:04 ET
- Period: 2024-09-30
- Accession: 0001104659-24-119467
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1798562/000110465924119467/tmc-20240930x10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1798562/000110465924119467/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2024-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Operating income | 3 months, 2024-07-01 to 2024-09-30 | −$20.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2024-01-01 to 2024-09-30 | −$64.9m | us-gaap:OperatingIncomeLoss |
| Net income | 3 months, 2024-07-01 to 2024-09-30 | −$20.5m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2024-01-01 to 2024-09-30 | −$65.9m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2024-07-01 to 2024-09-30 | $0.06 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2024-01-01 to 2024-09-30 | $0.21 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2024-07-01 to 2024-09-30 | $0.06 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2024-01-01 to 2024-09-30 | $0.21 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2024-07-01 to 2024-09-30 | 323,663,607 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2024-01-01 to 2024-09-30 | 318,710,622 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2024-01-01 to 2024-09-30 | −$29.7m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 9 months, 2024-01-01 to 2024-09-30 | $465.0k | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2024-09-30 | $360.0k | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2024-09-30 | $2.9m | us-gaap:AssetsCurrent |
| Total assets | at 2024-09-30 | $61.3m | us-gaap:Assets |
| Current liabilities | at 2024-09-30 | $57.2m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2024-09-30 | $82.8m | us-gaap:Liabilities |
| Short-term borrowings | at 2024-09-30 | $9.2m | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2024-09-30 | −$21.5m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 70,175 characters.

*The following discussion and analysis provide information which management believes is relevant to an assessment and understanding of our condensed consolidated results of operations and financial condition. The discussion should be read in conjunction with the unaudited condensed interim consolidated financial statements and notes thereto contained in this Quarterly Report on Form 10-Q and the consolidated financial statements and notes thereto for the year ended December 31, 2023 contained in our 2023 Annual Report on Form 10-K. This discussion contains forward looking statements and involves numerous risks and uncertainties, including, but not limited to, those described in “Risk Factors” in Item 1A of Part I of the 2023 Annual Report on Form 10-K, as updated and/or supplemented in subsequent filings with the SEC. Actual results may differ materially from those contained in any forward-looking statements. Unless the context otherwise requires, references to “we”, “us”, “our”, “TMC” and “the Company” are intended to mean the business and operations of TMC the metals company Inc. and its consolidated subsidiaries. The unaudited condensed consolidated interim financial statements for the three months and nine months ended September 30, 2024 and 2023, respectively, present the financial position and results of operations of TMC the metals company Inc. and its consolidated subsidiaries.*

### Overview

We are a deep-sea minerals exploration company focused on the collection, processing and refining of polymetallic nodules found on the seafloor in international waters of the Clarion Clipperton Zone (“CCZ”), about 1,500 miles south-west of San Diego, California. The CCZ is a geological submarine fracture zone of abyssal plains and other formations in the Eastern Pacific Ocean, with a length of around 7,240 km (4,500 miles) that spans approximately 4,500,000 square kilometers (1,700,000 square miles). Polymetallic nodules are discrete rocks that sit unattached to the seafloor, occur in significant quantities in the CCZ and have high concentrations of nickel, manganese, cobalt and copper in a single rock.

These four metals contained in the polymetallic nodules are critical for the transition to low carbon energy, as well as for infrastructure and development. Our resource definition work to date shows that nodules in our contract areas represent the world’s largest estimated undeveloped source of critical battery metals. If we are able to collect polymetallic nodules from the seafloor on a commercial scale, we plan to use such nodules to produce three types of metal products: (i) feedstock for battery cathode precursors (nickel and cobalt sulfates, or intermediary nickel-copper-cobalt matte, or nickel-copper-cobalt alloy) for electric vehicles (“EV”) and renewable energy storage markets, (ii) copper cathode for EV wiring, energy transmission and other applications, and (iii) manganese silicate for manganese alloy production required for steel production. Our mission is to build a carefully managed, shared stock of metal (a “metal commons”) that can be used, recovered and reused for generations to come. Significant quantities of newly mined metal are required because existing metal stocks are insufficient to meet rapidly rising demand.

Exploration and exploitation of seafloor minerals in international waters is regulated by the International Seabed Authority (“ISA”), an intergovernmental organization established pursuant to the 1994 Agreement Relating to the Implementation of the United Nations Convention on the Law of the Sea (“UNCLOS”). The ISA grants contracts to sovereign states or to private contractors who are sponsored by a sovereign state. The ISA requires that a contractor must obtain and maintain sponsorship by a host nation that is a member of the ISA and signatory to UNCLOS, and such nation must maintain effective supervision and regulatory control over such sponsored contractor. The ISA has issued a total of 19 polymetallic nodule exploration contracts covering approximately 1.28 million square kilometers, or 0.4% of the global seafloor, 17 of which are in the CCZ. We hold exclusive exploration and commercial rights to three of the 17 polymetallic nodule contract areas in the CCZ; two based on ISA exploration contracts through our subsidiaries Nauru Ocean Resources Inc. (“NORI”) and Tonga Offshore Mining Limited (“TOML”), sponsored by the Republic of Nauru (“Nauru”) and the Kingdom of Tonga (“Tonga”), respectively, and exclusive commercial rights through our subsidiary, DeepGreen Engineering Pte. Ltd.’s (“DGE”), and its arrangement with Marawa Research and Exploration Limited (“Marawa”), a company owned and sponsored by the Republic of Kiribati (“Kiribati”).

We have key strategic alliances with (i) Allseas, a leading global offshore contractor, which developed and tested a pilot collection system, and is now working to modify it into the first commercial production system and (ii) Glencore which holds offtake rights to 50% of the NORI nickel and copper production if produced from a DGE-owned or controlled facility. In addition, we have worked with an engineering firm Hatch Ltd. (Hatch) and consultants Kingston Process Metallurgy Inc. (KPM) to develop a near-zero solid waste flowsheet. The primary processing stages of the flowsheet from nodule to Ni-Cu-Co matte intermediate were demonstrated as part of our pilot plant program at FLSmidth and XPS’ facilities. The matte refining stages are being tested at SGS Lakefield. The near-zero solid waste flowsheet provides a design that is expected to serve as the basis for our onshore processing facilities. In November 2022, we entered into a non-binding Memorandum of Understanding (“MoU”) with Pacific Metals Co Ltd (PAMCO) of Japan pursuant to which PAMCO completed prefeasibility work assessing the prospect of processing nodules using their existing facilities. In November 2023, we entered into a binding MoU with PAMCO whereby they committed to completing a feasibility study (expected to be completed in the first half of 2025) to toll treat 1.3 million tonnes of wet polymetallic nodules per year at its Hachinohe, Japan smelting facility, provided we obtain an exploitation contract from the ISA as expected. The toll treatment is intended to take place on a dedicated Rotary Kiln Electric Arc Furnace (RKEF) processing line and produce two products: nickel-copper-cobalt alloy, an intermediate product used as feedstock to produce lithium-ion battery cathodes, and a manganese silicate product used to make silico-manganese alloy, a critical input into steel manufacturing. We expect this partnership to progress to a definitive tolling agreement in 2025, subject to successful evaluation study outcomes and agreement to mutually acceptable commercial terms. There can be no assurance that we will enter into such definitive strategic alliance in a particular time period, or at all, or on terms similar to those set forth in the binding MoU, or that if such definitive tolling agreement is entered into by us or that the existing facility will be able to successfully process nodules in a particular time period, or at all.

We are currently focused on preparing our application for a plan of work to the ISA for our first exploitation contract for the NORI contract area. Given that it is unlikely that the ISA Council would consider any application for a plan of work for exploitation before its next session in March 2025 and to ensure clarity on the submission process, consideration of the Application, and timeline, the Republic of Nauru, in consultation with NORI, has formally requested that this issue be added to the agenda of the Council’s March 2025 meeting. We expect that this will allow Council to discuss and approve the process to be confirmed prior to NORI’s expected application submission date of June 27, 2025. Based on the current timeline in the consolidated draft regulations issued February 2024, the ISA application review and approval process is expected to be approximately one year from the filing date. See “*Project and Regulatory Updates - ISA Developments”* below for a further discussion on recent developments at the ISA.

To reach our objective and initiate commercial production, we are: (i) defining our resource and project economics, (ii) developing a commercial offshore nodule collection system, (iii) assessing the environmental and social impacts of offshore nodule collection, and (iv) developing onshore technology to process collected polymetallic nodules into a manganese silicate product, and an intermediate nickel-copper-cobalt alloy or matte product and/or end-products like nickel and cobalt sulfates, and copper cathode.

We are still in the exploration phase and have not yet declared mineral reserves. In addition, we do not have the applicable environmental and other permits required to build and/or operate commercial scale polymetallic nodule processing and refining plants on land.

### Developments in the Third Quarter 2024

Below are some of the major developments that occurred in the third quarter of 2024:

### TMC and PAMCO Achieve Breakthrough in Commercial-Scale Processing of Polymetallic Nodules, Successfully Producing Calcine

In September 2024, we announced that we had successfully produced high temperature material (calcine) during the first phase of a commercial-scale campaign to process a 2,000-tonne sample of deep-seafloor polymetallic nodules at our partner PAMCO’s Hachinohe Rotary Kiln Electric-Arc Furnace facility in Hachinohe, Japan. Approximately 500 tonnes of calcine were produced and, in the coming months, PAMCO intends to commence the next phase of the processing trial by transferring the calcine material to its electric arc furnace for smelting into a high-grade nickel-copper-cobalt alloy and manganese silicate product.

### TMC CEO Testifies to U.S. House of Representatives on Benefits of Nodules

In September 2024, our CEO Gerard Barron gave testimony during a meeting of the Critical Mineral Policy Working Group for the House Select Committee on the Chinese Communist Party to discuss the U.S.’ heavy reliance on Chinese imports of critical minerals and policy solutions to incentivize greater cooperation with allies to create alternative supplies. Mr Barron spoke to the potential of seafloor nodules to secure U.S. supplies of key minerals for the energy transition and defense sectors.

### Rebuttal to Publication

In July 2024, Nature Geoscience published a paper claiming that seafloor nodules produce oxygen in the absence of sunlight. Since the paper’s publication, multiple rebuttals have been submitted to Nature warning of serious flaws with the paper’s methodology and claims, prompting calls for the paper to be retracted. Researchers at the University of Tokyo and University of Gothenburg are among the experts that have submitted pre-print rebuttals to the article’s author. Our own rebuttal, published September 19, 2024, notes selective reporting of data and omission of key evidence, including experiments that show oxygen increases without nodules, directly contradicting the authors’ claims.

### Developments Subsequent to September 30, 2024

### TMC Announces Registered Direct Offering for $17.5 million:

On November 14, 2024, the Company entered into a securities purchase agreement with certain new and existing institutional investors for the sale of an aggregate of 17,500,000 common shares (the “Shares”) and accompanying Class B warrants (the “Class B Warrants”), in a registered direct offering. The offering price was $1.00 per Share, resulting in gross proceeds of $17.5 million ($16.5 million after associated fees), with each Share including an accompanying Class B Warrant to purchase 0.5 common shares. The Class B Warrants are exercisable immediately upon issuance at a price of $2.00 per share and expire five years from issuance.

The Class B Warrants include customary anti-dilution protections and a repurchase feature, permitting the Company to repurchase the warrants for $0.0001 per Common Share underlying the Class B Warrants if the volume-weighted average price of the Company’s common shares exceeds $5.00 per share for each trading day in a consecutive 30-trading-day period.

### Extension and Increase of Credit Facility with ERAS Capital LLC and Gerard Barron

On November 14, 2024, we entered into the Second Amendment to the credit facility with ERAS Capital LLC and Gerard Barron (the “2024 Lenders”), to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) and to extend the maturity of the credit facility to December 31, 2025.

### Termination of Marawa Service Agreement

On November 14, 2024, DeepGreen Engineering Pte. Ltd. (“DeepGreen”) issued a formal termination notice to Marawa Research and Exploration Limited, ending the Services Agreement dated October 1, 2013 (the “Agreement”), pursuant to DeepGreen’s right to terminate for convenience under the Agreement. The termination will take effect two months from the date of the notice, on January 14, 2025. The termination is not expected to have a material adverse effect on the Company’s financial position or operations, with non-material ongoing costs and no termination penalties applicable under the Agreement.

### Project and Regulatory Updates

### NORI Area D Project Developments

On October 6, 2024, the first feed of Calcine was transported via conveyor to the furnace to commence the first smelting campaign at PAMCO’s facility in Hachinohe, Japan. Progress continues on the Environmental Impact Statement (EIS), Pre-Feasibility Study (PFS) which is nearing completion, and Plan of Work application documentation. Key activities during the third quarter 2024 included the substantial completion of the PFS, which has now entered the review and approval process. Our EIS team continued finalizing baseline reports to support the EIS workshop with subject-matter experts. We expect to issue an S-K 1300-compliant Technical Report Summary following the completion and approval of the PFS.

### ISA Developments

As we previously disclosed, the ISA did not provisionally adopt and approve the final rules, regulations and procedures (“RRPs” or the “Mining Code”) for the exploitation of seafloor resources by the July 9, 2023 deadline. At its July 2024 session, the ISA completed a first reading of the consolidated text and requested the Secretariat produce a second consolidated text in 2024. The ISA agreed to continue the negotiations of the Mining Code with a continued view to its adoption during the 30th session of the ISA in 2025. The ISA Council has scheduled two ISA Council meetings in March and July 2025 to progress the Mining Code and has agreed to continue working inter-sessionally to advance the text.

Consistent with Nauru’s rights, as the sponsoring state of NORI, under UNCLOS and the 1994 agreement relating to the implementation of Part XI of UNCLOS, NORI reserves its right to submit a plan of work for exploitation, in the absence of the adoption of the final Mining Code pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 agreement relating to the implementation of Part XI of UNCLOS, the possibility of which was recognized in ISA Council decisions ISBA/28/C/24 and ISBA/28/C/25. There can be no assurances, however, that the ISA will provisionally approve our plan of work or that such provisional approval would lead to the issuance of an exploitation contract by the ISA.

### Exploration Contracts

We currently hold exclusive exploration rights to certain polymetallic nodule areas in the CCZ through our subsidiaries NORI and TOML, sponsored by the Republic of Nauru and the Kingdom of Tonga, respectively, and exclusive commercial rights through our subsidiary’s (DGE) arrangement with Marawa, a company owned and sponsored by the Republic of Kiribati.

*NORI.* NORI our wholly-owned subsidiary, holds exploration rights to four blocks (NORI Area A, B, C, and D, the “NORI Contract Area”) covering 74,830 square kilometers in the CCZ that were granted by the ISA in July 2011. NORI is sponsored by Nauru pursuant to a certificate of sponsorship signed by the Government of Nauru on April 11, 2011. The D block of the NORI area (“NORI Area D”) is the seafloor parcel where we have performed the most resource definition and environmental work to date. NORI commissioned AMC Consulting Ltd, a leading mining consulting firm (AMC), to undertake a preliminary economic assessment (“PEA”) of the mineral resource contained in NORI Area D and to compile a technical report compliant with Canadian National Instrument (NI 43-101), which was completed in March 2021. AMC subsequently compiled the NORI Technical Report Summary, dated March 2021, which included an initial assessment and an economic analysis of NORI Area D prepared in accordance with the SEC’s Modernization of Property Disclosures for Mining Registrants set forth in subpart 1300 of Regulation S-K (the “SEC Mining Rules”). The NORI Technical Report Summary is filed as Exhibit 96.1 in our 2023 Annual Report on Form 10-K.

*TOML.* TOML our wholly-owned subsidiary which we acquired in March 2020, holds exploration rights to an area covering 74,713 square kilometers in the CCZ that were granted by the ISA in January 2012 (the “TOML Contract Area”). On March 8, 2008, Tonga and TOML entered into a sponsorship agreement formalizing certain obligations of the parties in relation to TOML’s exploration application to the ISA (subsequently granted) for the TOML Contract Area. The sponsorship agreement was updated on September 23, 2021. TOML commissioned a Technical Report Summary by AMC, dated March 2021, which is filed as Exhibit 96.2 in our 2023 Annual Report on Form 10-K.

*Marawa.* DGE, our wholly-owned subsidiary, entered into agreements with Marawa and Kiribati which provide DGE with exclusive exploration rights to an area covering 74,990 square kilometers in the CCZ (the “Marawa Contract Area”). The exploration contract between Marawa and the ISA (the “Marawa Exploration Contract”) was signed on January 19, 2015. To date, limited offshore marine resource definition activities in the Marawa Contract Area have occurred. We are collaborating with Marawa to assess the viability of any potential project in the Marawa Contract Area, although the timing of such assessment is uncertain. Marawa has delayed certain of its efforts in the Marawa Contract Area while it determines how it will move forward with additional assessment work.

### Key Trends, Opportunities and Uncertainties

We are currently a pre-revenue company and we do not anticipate earning revenues until such time as NORI receives an exploitation contract from the ISA and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. We believe that our performance and future success pose risks and challenges, including those related to: finalization of ISA regulations to allow for commercial exploitation, approval of an application for the ISA exploitation contract, development of environmental regulations associated with our business and development of our technologies to collect and process polymetallic nodules. These risks, as well as other risks, are discussed in the section entitled “*Risk Factors”* in Item 1A of Part I of the 2023 Annual Report on Form 10-K, as further updated and/or supplemented in subsequent filings with the SEC.

### Basis of Presentation

We currently conduct our business through one operating segment. As a pre-revenue company with no commercial operations, our activities to date have been limited. Our results are reported under Generally Accepted Accounting Principles in the United States (“U.S. GAAP”) and in U.S. dollars.

### Components of Results of Operations

We are an exploration-stage company with no revenue to date and a net loss of $20.5 million and $65.9 million for the three and nine months ended September 30, 2024, respectively, compared to a net loss of $12.5 million and $40.3 million in the same periods of 2023, respectively. We have an accumulated deficit of approximately $614.8 million from inception through September 30, 2024.

Our historical results may not be indicative of our future results for reasons that may be difficult to anticipate. Accordingly, the drivers of our future financial results, as well as the components of such results, may not be comparable to our historical or projected results of operations.

### Revenue

To date, we have not generated any revenue. We expect to generate revenue once NORI receives an exploitation contract from the ISA and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. Any revenue from initial production is difficult to predict.

### Exploration and Evaluation Expenses

We expense all costs relating to exploration and development of mineral claims. Such exploration and development costs include, but are not limited to, ISA contract management, geological, geochemical and geophysical studies, environmental baseline studies, process development and payments to Allseas for the pilot mining test system (“PMTS”). Our exploration expenses are impacted by the amount of exploration work conducted during each period. The acquisition cost of ISA polymetallic nodule exploration contracts will be charged to operations as amortization expense on a unit-of-production method based on proven and probable reserves should commercial production commence in the future.

### General and Administrative Expenses

General and administrative (“G&A”) expenses consist primarily of compensation for employees, consultants and directors, including share-based compensation, consulting fees, investor relations expenses, expenses related to advertising and marketing functions, insurance costs, office and sundry expenses, professional fees (including legal, audit and tax fees), travel expenses and transfer and filing fees.

Share-based compensation costs from the issuance of stock options and restricted share units (“RSUs”) is measured at the grant date based on the fair value of the award and is recognized over the related service period. Share-based compensation costs are charged to exploration expenses and general and administrative expenses depending on the function fulfilled by the holder of the award. In instances where an award is issued for financing related services, the costs are included within equity as part of the financing costs. We recognize forfeiture of any awards as they occur.

### Interest Income

Interest income consists primarily of interest earned on our cash and cash equivalents.

### Fees and Interest on Borrowings and Credit Facilities

Fees and interest on borrowings and credit facilities represent interest charged on the Company’s short-term debt and interest and underutilization fees associated with the Company’s credit facilities.

### Foreign Exchange Gain/Loss

The foreign exchange gain or loss for the periods reported primarily relates to our cash held in Canadian dollars and to the settlement of costs incurred in foreign currencies, depending on either the strengthening or weakening of the U.S. dollar.

### Change in Fair Value of Warrants Liability

The change in fair value of warrants liability primarily consists of the change in the fair value of our 9,500,000 Private Warrants, which is re-measured at the end of each reporting period.

### Results of Operations

The following is a discussion of our results of operations for the three and nine months ended September 30, 2024 and 2023. Our accounting policies are described in Note 3 “Significant Accounting Policies” in our financial statements filed as part of the 2023 Annual Report on Form 10-K.

Additionally, the unaudited condensed consolidated interim financial statement for the nine months ended September 30, 2023 have been revised to correct prior period errors as discussed in Note 22 “Quarterly Financial Data (Unaudited) Restatement of Previously Issued Financial Statements” to the consolidated financial statement included in Part II, Item 8 of our 2023 Annual Report on Form 10-K. Accordingly, the Management’s Discussion and Analysis of Financial Condition and Results of Operations reflect the effects of the revisions.

### Comparison of the Three and Nine Months Ended September 30, 2024 and 2023

*(Dollar amounts in thousands, except as noted)*

| ​ ​ ​ | ​ ​ | ​ ​ For the Three Months Ended September 30, 2024 | ​ | ​ ​ 2023 | ​ | ​ % Change | ​ ​ ​ | ​ ​ For the Nine Months Ended September 30, 2024 | ​ ​ | ​ ​ 2023 | ​ | ​ % Change |
| --- | --- | --- | --- | ---: | --- | ---: | --- | --- | --- | ---: | --- | ---: |
| Exploration and evaluation expenses |  | $11,813 | ​ | $7,905 |  | 49% | ​ | $42,339 | ​ | $23,172 |  | 83% |
| General and administrative expenses |  | ​ 8,149 | ​ | 4,613 |  | 77% | ​ | ​ 22,600 | ​ | 15,958 |  | 42% |
| Equity-accounted investment loss |  | ​ 58 | ​ | 119 |  | (51)% | ​ | ​ 197 | ​ | 475 |  | (59)% |
| Change in fair value of warrants liability | ​ | ​ (1,054) | ​ | ​ (117) | ​ | 801% | ​ | ​ (1,103) | ​ | ​ 1,214 | ​ | (191)% |
| Foreign exchange loss (gain) |  | ​ 946 | ​ | 14 |  | 6,657% | ​ | ​ 596 | ​ | 66 |  | 803% |
| Interest income |  | ​ (7) | ​ | (319) |  | (98)% | ​ | ​ (125) | ​ | (1,092) |  | (89)% |
| Fees and interest on borrowings and credit facilities | ​ | ​ 615 | ​ | ​ 252 | ​ | 144% | ​ | ​ 1,378 | ​ | ​ 529 | ​ | 160% |
| Net Loss for the period | ​ | $20,520 | ​ | $12,467 | ​ | 65% | ​ | $65,882 | ​ | $40,322 | ​ | 63% |

### Three Months ended September 30, 2024 compared to Three Months ended September 30, 2023

We reported a net loss of approximately $20.5 million in the third quarter of 2024, compared to a net loss of $12.5 million in the same period of 2023. The following explains the major reasons for the increase in the net loss in the third quarter of 2024.

### Exploration and Evaluation Expenses

Exploration and evaluation expenses for the three months ended September 30, 2024 were $11.8 million, compared to $7.9 million for the same period in 2023. The increase of $3.9 million was primarily due to an increase in share-based compensation of $1.8 million due to the amortization of the fair value of RSUs and options granted to the directors and officers in the second quarter of 2024, increase in mining, technological and process development of $1.0 million resulting from increased engineering work by Allseas and higher personnel costs of $1.0 million.

### General and Administrative Expenses

G&A expenses for the three months ended September 30, 2024 were $8.1 million compared to $4.6 million for the same period in 2023. The increase of $3.5 million in G&A expenses was mainly due to an increase in share-based compensation of $1.8 million due to the amortization of the fair value of RSUs and options granted to the directors and officers in the second quarter of 2024, an increase in legal and consulting costs of $1.0 million and higher personnel costs of $0.5 million.

### Change in Fair Value of Warrants Liability

The change in fair value of warrants liability consists of the change in the fair value of the 9,500,000 Private Warrants. During the three months ended September 30, 2024, the fair value of warrants liability decreased reflecting the decline in both the price of the public warrants and price of the Company’s shares.

### Fees and Interest on Borrowings and Credit Facilities

The interest charged on the Company’s short-term debt borrowings was $0.1 million in the third quarter of 2024 ($nil for the same period of 2023), while interest on drawn amounts on the Company’s credit facilities was $0.1 million and underutilization fees on these same facilities was $0.5 million in the third quarter of 2024 ($nil and $0.3 million over the same periods in 2023, respectively).

### Nine Months ended September 30, 2024 compared to Nine Months ended September 30, 2023

We reported a net loss of $65.9 million in the first nine months of 2024, compared to a net loss of $40.3 million in the same period of 2023. The following explains the major reasons for the increase in the net loss in the first nine months of 2024.

### Exploration and Evaluation Expenses

Exploration and evaluation expenses for the nine months ended September 30, 2024 were $42.3 million, compared to $23.2 million for the same period in 2023. The increase of $19.1 million was primarily due to an increase in mining, technological and process development of $13.3 million resulting from increased engineering work by Allseas, as well as expenses incurred on the transportation of nodules to PAMCO’s facility in Japan, higher personnel costs of $3.2 million and an increase in share-based compensation of $3.5 million due to the amortization of the fair value of RSUs and options granted to the directors and officers in the second quarter of 2024. This was partially offset by a decrease in environmental studies as the cost for Campaign 8 which commenced in the fourth quarter of 2023 was completed in the first quarter of 2024 and was lower than the cost of the environmental work in the first nine months of 2023 following the completion of the NORI pilot nodule collection system test.

### General and Administrative Expenses

G&A expenses for the nine months ended September 30, 2024 were $22.6 million, compared to $16.0 million for the same period in 2023. The increase of $6.6 million in G&A expenses in the first nine months of 2024 was mainly the result of an increase in share-based compensation of $4.0 million due to the amortization of the fair value of RSUs and options granted to the directors and officers in the second quarter of 2024, higher personnel cost of $1.9 million and higher cost incurred on business development and advisory activities. This increase was partially offset by decreased legal and insurance costs incurred in the first half of 2024 compared to the same period in 2023.

### Change in Fair Value of Warrants Liability

The change in fair value of warrants liability consists of the change in the fair value of the 9,500,000 Private Warrants. For the nine months ended September 30, 2024, the fair value of warrants liability decreased reflecting the decline in both the price of the public warrants and price of Company’s shares.

### Fees and Interest on Borrowings and Credit Facilities

The interest charged on the Company’s short-term debt borrowings was $0.1 million in the first nine months of 2024 ($nil for the same period of 2023), while interest on drawn amounts on the Company’s credit facilities was $0.1 million and underutilization fees on these same facilities was $1.2 million in the first nine months of 2024 ($nil and $0.5 million over the same periods in 2023, respectively).

### Liquidity and Capital Resources

Our primary sources of financing have come from private placements and public offerings of Common Shares and warrants, the issuance of convertible debentures and from credit facilities. As of September 30, 2024, we had cash on hand of $0.4 million.

In light of the significant deficit in expected funding following the closing of the Business Combination in September 2021, we adopted what we call a “capital-light” strategy whereby we removed any allocation of funds to capital expenditures that were not deemed necessary to support the submission of an application for an exploitation contract for the NORI contract area, and by negotiating the settlement of program expenditures with our equity whenever possible.

We have yet to generate any revenue from our business operations. We are an exploration-stage company and the recovery of our investment in mineral exploration contracts and attainment of profitable operations is dependent upon many factors including, among other things, the development of commercial production system for collecting polymetallic nodules from the seafloor as well as the development of our processing technology for the metallurgical treatment of such nodules, the establishment of mineable reserves, the demonstration of commercial and technical feasibility of seafloor polymetallic nodule collection and processing systems, metal prices, and securing ISA exploitation contracts or provisional approvals. While we have obtained financing in the past, there is no assurance that such financing will continue to be available on favorable terms, in sufficient amounts, or at all.

We expect to incur significant expenses and operating losses for the foreseeable future, particularly as we advance towards our application to the ISA for an exploitation contract and preparation for potential commercialization. Based on our cash balance and availability of borrowing under our credit facility with a company related to Allseas, as we expect the credit facility will be amended, and credit facility with ERAS Capital LLC and Gerard Barron, when compared with our forecasted cash expenditures, we believe we will have sufficient funds to meet our obligations that become due within the next twelve months. Our estimates used in reaching this conclusion are based on information available as at the date of filing this Quarterly Report on Form 10-Q. Accordingly, actual results could differ from these estimates and resulting variances may result in our need for additional funding in an amount greater or earlier than expected, due to changes in business conditions or other developments, including, but not limited to, deferral of approvals, capital and operating cost escalation, currently unrecognized technical and development challenges, our ability to pay certain vendors or suppliers in our Common Shares or changes in external business environment.

In addition, we will however need and are seeking additional financing to fund our continued operations over time. These financings could include additional public or private equity, debt financings, equity-linked financings or other sources of financing, including through non-dilutive asset, royalty or project-based and/or asset-based financings. If these financing or other financing sources are not available, or if the terms of financing are less desirable than we expect, or if in insufficient amounts, we may be forced to delay our exploration and/or exploitation activities or further scale back our operations, which could have a material adverse impact on our business and financial prospects.

On September 16, 2022, we filed a registration statement on Form S-3 with the SEC, which the SEC declared effective on October 14, 2022, to sell up to $100 million of securities, which includes the $30 million that may be sold under the At-the-Market Equity Distribution Agreement discussed below and the Common Shares and shares underlying the Class A Warrants issued in the Registered Direct Offering. In addition, on November 30, 2023, we filed an additional registration statement on Form S-3 with the SEC, which the SEC declared effective on December 8, 2023, to sell up to an additional $100 million of securities. Securities that may be sold under the registration statements include common shares, preferred shares, debt securities, warrants and units. Any such offering, if it does occur, may happen in one or more transactions. Specific terms of any securities to be sold will be described in supplemental filings with the SEC.

On December 22, 2022, we entered into an At-the-Market Equity Distribution Agreement (the “Sales Agreement”) with Stifel, Nicolaus & Company, Incorporated (“Stifel”) and Wedbush Securities Inc., as sales agents, allowing us, from time to time, to issue and sell Common Shares with an aggregate offering price of up to $30 million. On December 21, 2023, we amended the Sales Agreement to remove Stifel as a sales agent. The offer and sales of the shares are made under our effective “shelf” registration statement on Form S-3 filed with the SEC on September 16, 2022, which the SEC declared effective on October 14, 2022. In the third quarter of 2024, we sold 1,617,000 Common Shares pursuant to the Sales Agreement at an average share price of $1.45 for net proceeds of $2.3 million, net of fees and commissions.

On March 22, 2023, we entered into a Credit Facility with Argentum Cedit Virtuti GCV, the parent of Allseas Investments S.A. and an affiliate of Allseas, which was amended on July 31, 2023 and March 22, 2024, pursuant to which, we may borrow from the Lender up to $25 million in the aggregate, from time to time, subject to certain conditions. All amounts drawn under the Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the Credit Facility. We have the right to pre-pay the entire amount outstanding under the Credit Facility at any time, before the Credit Facility’s maturity of August 31, 2025. The Credit Facility also contains customary events of default. On August 16, 2024, the Company entered into the Third Amendment to the Credit Facility, to increase the borrowing limit of the Credit Facility to $27.5 million. Under the terms of the Third Amendment, the borrowing limit will return to $25 million upon certain financing events. As of the date of this Quarterly Report on Form 10-Q, no amounts have been drawn under this Credit Facility.

On August 14, 2023, we entered into a securities purchase agreement for a Registered Direct Offering of our Common Shares and Class A Warrants, the final closing of which occurred on January 31, 2024. The purchase price for each Common Share and Class A Warrant to purchase 0.5 Common Shares was $2.00 per unit. The exercise price to purchase one Common Share under the Class A Warrants is $3.00, subject to adjustment as provided in the warrant agreement. The aggregate gross proceeds from the Registered Direct Offering were approximately $24.9 million, before deducting fees payable to financial advisors and other offering expenses payable by the Company ($23.6 million net of fees).

On March 22, 2024, we entered into an Unsecured Credit Facility with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar, pursuant to which, we may borrow from the 2024 Lenders up to $25,000,000 in the aggregate ($12,500,000 from each of the 2024 Lenders), from time to time (was initially $20,000,000 in the aggregate ($10,000,000 from each of the 2024 Lenders), subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. We have the right to pre-pay the entire amount outstanding under the 2024 Credit Facility at any time, before the 2024 Credit Facility’s maturity of December 31, 2025. The 2024 Credit Facility also contains customary events of default. The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least $50,000,000 in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement. On August 13, 2024, we entered into the First Amendment to the 2024 Credit Facility to increase the borrowing limit to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders). Under the terms of the First Amendment, the borrowing limit was due to return to the initial $20 million in the aggregate ($10 million from each of the 2024 Lenders) upon certain financing events. On November 14, 2024, we entered into the Second Amendment to the 2024 Credit Facility with ERAS Capital LLC and Gerard Barron, to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) and to extend the maturity of the 2024 Credit Facility to December 31, 2025. As of the date of this Quarterly Report on Form 10-Q, there was $4.3 million drawn under the 2024 Credit Facility, including a draw of $0.1 million subsequent to September 30, 2024.

On May 27, 2024, the Company entered into a short-term loan agreement with the Lender (Argentum Cedit Virtuti GCV), an affiliate of Allseas. In accordance with the agreement, the Lender provided a short-term loan amounting to $2 million (the “Loan”) on May 30, 2024. The Loan takes priority over the 2024 Credit Facility. The Loan matured on September 10, 2024 (maturity date) and accrued interest at a rate of 8% per annum. On the maturity date, Company repaid the entire Loan amounting to $2 million and the accrued interest amounting to $46 thousand.

On September 9, 2024, the Company entered into a working capital loan agreement (the “Working Capital Loan Agreement”) with Allseas Investments SA (the “Allseas Investments”), a company related to Allseas. In accordance with the Working Capital Loan Agreement, Allseas Investments provided a loan to the Company amounting to $5 million (the “Working Capital Loan”) on September 10, 2024, to be used towards general corporate purposes and the repayment of all outstanding amounts under the Short-Term Loan between the Company and the Lender. The Working Capital Loan is payable to the Lender on or before the earlier of (i) the occurrence of certain financing events and (ii) April 1, 2025 (the “Repayment Date”). The Working Capital Loan will bear interest based on the 6-month Secured Overnight Financing Rate, 180-day average plus a margin of 4.0% per annum and is payable in two installments on January 2, 2025, and the Repayment Date (or plus a margin of 5.0% if all interest payments are deferred to the Repayment Date, at the Company’s election). On October 18, 2024, the Company entered into the First Amendment to the Working Capital Loan Agreement with Allseas Investments, resulting in a further draw of $2.5 million by the Company and a total Working Capital Loan drawn amount of $7.5 million.

On November 14, 2024, the Company entered into a securities purchase agreement with certain new and existing institutional investors for the sale of an aggregate of 17,500,000 common shares (the “Shares”) and accompanying Class B warrants (the “Class B Warrants”), in a registered direct offering. The offering price was $1.00 per Share, with each Share including an accompanying Class B Warrant to purchase 0.5 common shares. The Class B Warrants are exercisable immediately upon issuance at a price of $2.00 per share and expire five years from issuance. The aggregate gross proceeds from the Registered Direct Offering were approximately $17.5 million, before deducting fees payable to financial advisors and other offering expenses payable by the Company ($16.5 million net of fees).

The Class B Warrants include customary anti-dilution protections and a repurchase feature, permitting the Company to repurchase the warrants for $0.0001 per Common Share underlying the Class B Warrants if the volume-weighted average price of the Company’s common shares exceeds $5.00 per share for each trading day in a consecutive 30-trading-day period.

We may receive up to approximately $281.8 million in aggregate gross proceeds from cash exercises of the Public Warrants and the Private Warrants, based on the per share exercise price of such warrants. However, the exercise price for the outstanding Public Warrants and Private Warrants is $11.50 per common share and there can be no assurance that such warrants will be in the money prior to their expiration, and as such, such warrants may expire worthless. Based on the current trading price of our Common Shares we do not expect to receive any proceeds from the exercise of the Public Warrants and Private Warrants unless there is a significant increase in the price of our Common Shares. In certain circumstances, the Public Warrants and Private Warrants may be exercised on a cashless basis and the proceeds from the exercise of such warrants will decrease. Furthermore, even if the warrants will be in the money, the holders of the warrants are not obligated to exercise their warrants, and we cannot predict whether holders of the warrants will choose to exercise all or any of their warrants. In addition, the exercise price to purchase one Common Share under the outstanding Class A Warrants is $3.00 (subject to customary adjustments). Upon the closing of the November 2024 Registered Direct Offering described above, the exercise price of the Class A Warrants will be adjusted downward pursuant to the terms of the Class A Warrants. There can be no assurance that such warrants will be exercised prior to their expiration, and as such, such warrants may expire, and we will not receive any proceeds from the excise thereof.

### Cash Flows Summary

Presented below is a summary of our operating, investing and financing cash flows:

| ​ ​ (thousands) ​ | ​ ​ | ​ ​ For the Three Months Ended September 30, 2024 | ​ | ​ ​ 2023 | ​ ​ | ​ ​ For the Nine Months Ended September 30, 2024 | ​ | ​ ​ 2023 |
| --- | --- | ---: | --- | ---: | --- | ---: | --- | ---: |
| Net cash used in operating activities | ​ | $(5,736) | ​ | $(12,505) | ​ | $(29,677) | ​ | $(44,388) |
| Net cash used in investing activities | ​ | $(50) | ​ | $(100) | ​ | $(465) | ​ | $(175) |
| Net cash provided by financing activities | ​ | $5,626 | ​ | $15,137 | ​ | $23,313 | ​ | $20,216 |
| (Decrease) Increase in cash | ​ | $(160) | ​ | $2,532 | ​ | $(6,829) | ​ | $(24,347) |

### Nine Months ended September 30, 2024 compared to Nine Months ended September 30, 2023

### Cash flows used in Operating Activities

For the nine months ended September 30, 2024, major operating activities over this period involved Campaign 8, as well as advanced work on engineering and pre-feasibility studies as we advance towards our application to the ISA for a NORI exploitation contract and prepare for potential future commercial production. Net cash used in operating activities in the first nine months of 2024, amounted to $29.7 million, and consisted mainly of $13.0 million on various environmental work, $6.1 million on personnel costs, $3.9 million on legal, advisory and consulting, $1.9 million for sponsorship, training and stakeholder engagement support, $1.7 million spent on engineering and pre-feasibility studies, $1.5 million on communication and business development expenses, and additional payments of $1.6 million for various expenses.

For the nine months ended September 30, 2023, operating activities focused mainly on the continuation of environmental work following the completion of the NORI integrated collector test, as well as progressing on engineering work and pre-feasibility studies on the project. Net cash used in operating activities in the first nine months of 2023, amounted to $44.4 million, and consisted mainly of $24.8 million on various environmental work, $7.5 million on personnel costs, $3.7 million on legal costs, $2.6 million for sponsorship, training, and stakeholder engagement support, $1.6 million spent on engineering and pre-feasibility studies, $1 million on communication and business development expenses and additional payments of $4.2 million for various expenses.

### Cash flows used in Investing Activities

Net cash provided by investing activities for the nine months ended September 30, 2024 was $0.5 million for the purchase of equipment and software development.

### Cash flows provided by Financing Activities

Net cash provided by financing activities for the nine months ended September 30, 2024 was $23.3 million, which comprised of proceeds received from the Registered Direct Offering announced in August 2023 of $9 million, proceeds from short term debt and credit facilities of $9.2 million, proceeds from shares issued from ATM of $4.9 million and proceeds from exercise of stock options and employee stock plans of $0.5 million while the 2023 first nine months results represent the cash received from the Registered Direct Offering of $14.9 million and cash received of $5 million on closing of our investment in Low Carbon Royalties.

### Contractual Obligations and Commitments

### NORI Exploration Contract

As part of the NORI Exploration Contract with the ISA, NORI submitted a periodic review report to the ISA in 2021, covering the 2017-2021 period. The periodic review report, which included a proposed work plan and estimated budget for 2022 to 2026, has been reviewed by and agreed with the ISA, and we are implementing this five-year plan. The cost of NORI’s estimated work plan for 2024 onwards is contingent on the ISA’s approval of the NORI contract area exploitation application. Should the approval of NORI’s exploitation application for the NORI contract area be delayed or rejected, NORI intends to revise its estimated future work plan in respect of its NORI Area. Work plans are reviewed annually by us, agreed with the ISA and may be subject to change depending on our progress to date.

### TOML Exploration Contract

As part of the TOML Exploration Contract, TOML submitted a periodic review report to the ISA in 2021, covering the 2017-2021 period. The periodic review report included a summary of work completed over the five-year period and a program of activities and estimated budget for the next five-year period. On December 23, 2022, the ISA accepted TOML’s proposed program of activities for the 2022-2026 five-year period, which included an estimated five-year expenditure of up to $44 million. The five-year estimated expenditure is indicative and subject to change, TOML will review the program regularly and TOML will inform the ISA of any changes through its annual reports.

### Marawa Services Agreement

In 2013, DGE entered into the Marawa Services Agreement with Marawa which granted DGE exclusive rights to manage and carry out all exploration and exploitation in the Marawa Area. Under Marawa’s Exploration Contract with the ISA, Marawa submitted a periodic review report to the ISA that included a proposed work plan and estimated budget for the 2020-2024 five-year period. The five-year estimated expenditure is indicative and subject to change, Marawa will review the program regularly and Marawa will inform the ISA of any changes through its annual reports. Marawa is scheduled to submit a new periodic review in 2024, which will include a new work plan. To date, limited offshore marine resource definition activities in the Marawa Contract Area have occurred. We are collaborating with Marawa to assess the viability of any potential project in the Marawa Contract Area, although the timing of such assessment is unclear. Marawa has delayed certain of its efforts in the Marawa Contract Area while it determines how it will move forward with additional assessment work.

### Regulatory Obligations Relating to Exploration Contracts

Both TOML and NORI require sponsorship from their host sponsoring nations, Tonga and Nauru, respectively. Each company has been registered and incorporated within the applicable host nation’s jurisdiction. The ISA requires that a contractor must obtain and maintain sponsorship by a host nation that is a member of the ISA and such state must maintain effective supervision and regulatory control over such sponsored contractor. Each of TOML and NORI is subject to the registration and incorporation requirements of these nations. In the event the sponsorship is otherwise terminated, such subsidiary will be required to obtain new sponsorship from another state that is a member of the ISA. Failure to obtain such new sponsorship would have a material impact on the operations of such subsidiary and us.

On August 20, 2024, Nauru updated its Nauru Seabed Minerals Authority Act, to prepare its regulatory regime for the transition from exploration to exploitation.

### Sponsorship Agreements

On July 5, 2017, Nauru, the Nauru Seabed Minerals Authority and NORI entered into the NORI Sponsorship Agreement formalizing certain obligations of the parties in relation to NORI’s exploration and potential exploitation of the NORI Area. Upon reaching the minimum recovery level within the exploitation contract area, NORI will pay Nauru a seabed mineral recovery payment based on the polymetallic nodules recovered from the exploitation contract area. In addition, NORI will pay an administration fee each year to Nauru for such administration and sponsorship, which is subject to review and increase in the event NORI is granted an ISA exploitation contract. NORI has begun discussions with the Government of Nauru to renegotiate the existing sponsorship agreement and has also committed to ensuring NORI pays corporate income tax within Nauru, assuming our future operations are ultimately profitable.

On March 8, 2008, Tonga and TOML entered into the TOML Sponsorship Agreement formalizing certain obligations of the parties in relation to TOML’s exploration and potential exploitation of the TOML Area. On September 23, 2021, TOML and Tonga updated the TOML Sponsorship Agreement harmonizing the terms of its agreement with those held by NORI with Nauru. TOML expects to renegotiate the existing sponsorship agreement with Tonga prior to entering into operations in the TOML Area and has committed to paying corporate income tax within Tonga, assuming our future operations are ultimately profitable.

### Allseas Agreements

On March 29, 2019, we entered into a strategic alliance with Allseas to develop a system to collect, lift and transport nodules from the seafloor to shore and agreed to enter into a nodule collection and shipping agreement whereby Allseas would provide commercial services for the collection of the first 200 million metric tonnes of polymetallic nodules on a cost plus 50% profit basis. In furtherance of this agreement, on July 8, 2019, we entered into a Pilot Mining Test Agreement with Allseas (“PMTA”), which was amended on five occasions through February 2023, to develop and deploy a PMTS, successful completion of which is a prerequisite for our application for an exploitation contract with the ISA. Under the PMTA, Allseas agreed to cover the development cost of the project in exchange for a payment from us upon successful completion of the pilot trial of the PMTS in NORI Area D.

On March 16, 2022, NORI and Allseas entered into a non-binding term sheet for the development and operation of a commercial nodule collection system. The pilot nodule collection system developed and tested by Allseas is expected to be upgraded to a commercial system with an expanded targeted production capacity of up to an estimated 3.0 million tonnes of wet nodules per year, to be delivered in stepped increments. NORI and Allseas intend to equally finance all costs related to developing and getting the first commercial system into production. Once in production, NORI is expected to pay Allseas a nodule collection and transshipment fee and, as Allseas scales up production to up to an estimated 3.0 million wet tonnes of nodules per year, it is expected that unit costs will be reduced. Following the successful completion of the NORI Area D pilot collection system trials in November 2022 and subsequent analysis of pilot data, the parties are reviewing Project Zero Offshore Nodule Collection System production targets, system design and cost estimates and enter into a binding Heads of Terms. The parties expect to further detail their relationship in a single definitive agreement using Work Planning and Budgeting procedure to allow for flexibility as the Allseas and NORI project team complete system engineering, upgrades and start commercial production. Subject to the necessary regulatory approvals, Allseas and NORI also intend to investigate acquiring a second production vessel similar to the *Hidden Gem*, another Samsung 10000, with the potential for an additional production rate of three million tonnes of wet nodules per year. There can be no assurances, however, that we will enter into a definitive agreement with Allseas contemplated by the non-binding term sheet in a particular time period, or at all, or on terms similar to those set forth in the non-binding term sheet, or that if such a definitive agreement is entered into by us that the proposed commercial systems and second production vessel will be successfully developed or operated in a particular time period, or at all.

Through September 30, 2024, we have made the following payments to Allseas under the PMTA: (a) $10 million in cash in February 2020, (b) $10 million through the issuance of 3.2 million Common Shares valued at $3.11 per share in February 2020, (c) issued Allseas a warrant to purchase 11.6 million Common Shares at a nominal exercise price per share in March 2021, (d) $10 million in cash in October 2021, following the closing of the Business Combination and meeting certain progress targets on the PMTS and (e) on February 23, 2023 issued 10.85 million Common Shares to Allseas. On August 9, 2023, 11,578,620 common shares were issued to Allseas upon the exercise of the warrant that was granted to Allseas in March 2021, and receipt of the exercise fee of $115.8 thousand. The warrant vested and became exercisable on successful completion of the PMTS in November 2022.

On November 11, 2022, our board of directors approved the successful completion and testing of the PMTS in the NORI Area D and payment of the third milestone amounting to $10 million and additional costs owed to Allseas under the PMTA by issuing 10.85 million Common Shares to Allseas priced at $1.00 per share on February 23, 2023.

On August 1, 2023, we entered into an Exclusive Vessel Use Agreement with Allseas pursuant to which Allseas will give us exclusive use of the vessel (“*Hidden Gem”*) in support of the development of the Project Zero Offshore Nodule Collection System until the system is completed or December 31, 2026, whichever is earlier. In consideration of the exclusivity term, on August 14, 2023, we issued 4.15 million Common Shares to Allseas.

### Offtake Agreement

On May 25, 2012, DGE and Glencore entered into a copper offtake agreement and a nickel offtake agreement. DGE has agreed to deliver to Glencore 50% of the annual quantity of copper and nickel produced by a DGE-owned facility from nodules derived from the NORI Area at London Metal Exchange referenced market pricing with allowances for product quality and delivery location. Either party may terminate the agreement upon a material breach or insolvency of the other party. Glencore may also terminate the agreement by giving twelve months’ notice.

### Borrowing with Company Related to Allseas

### 2023 Credit Facility

As described above, on March 22, 2023, the Company entered into the 2023 Credit Facility with Argentum Cedit Virtuti GCV, an affiliate of Allseas, under which we may borrow up to $25.0 million pursuant to the terms and conditions of the Credit Facility, as amended, which has a maturity date of August 31, 2025. On August 16, 2024, the Company entered into the Third Amendment to the Credit Facility, to increase the borrowing limit of the Credit Facility to $27.5 million. Under the terms of the Third Amendment, upon closing of the November 2024 Registered Direct Offering discussed above, the borrowing limit will return to $25 million. The Credit Facility remained undrawn as at September 30, 2024.

### 2024 Short-Term Loan and Working Capital Loan

On May 27, 2024, the Company entered into a short-term loan agreement with Argentum Cedit Virtuti GCV whereby the Company borrowed $2 million (the “Loan”) on May 30, 2024. The Loan matured on September 10, 2024 (maturity date) and accrued interest at a rate of 8% per annum. On the maturity date, Company repaid the entire Loan amounting to $2 million and the accrued interest.

On September 9, 2024, the Company entered into a working capital loan agreement (the “Working Capital Loan Agreement”) with Allseas Investments SA (the “Allseas Investments”), a company related to Allseas. In accordance with the Working Capital Loan Agreement, Allseas Investments provided a loan to the Company amounting to $5 million (the “Working Capital Loan”) on September 10, 2024, to be used towards general corporate purposes and the repayment of all outstanding amounts under the Short-Term Loan between the Company and the Lender. The Working Capital Loan is payable to the Lender on or before the earlier of (i) the occurrence of certain financing events and (ii) April 1, 2025 (the “Repayment Date”). The Working Capital Loan will bear interest based on the 6-month Secured Overnight Financing Rate, 180-day average plus a margin of 4.0% per annum and is payable in two installments on January 2, 2025, and the Repayment Date (or plus a margin of 5.0% if all interest payments are deferred to the Repayment Date, at the Company’s election). On October 18, 2024, the Company entered into the First Amendment to the Working Capital Loan Agreement with Allseas Investments, resulting in a further draw of $2.5 million by the Company and a total Working Capital Loan drawn amount of $7.5 million.

### Credit Facility with ERAS Capital LLC and Gerard Barron

On March 22, 2024, the Company entered into an Unsecured Credit Facility with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar, pursuant to which, we may borrow from the 2024 Lenders up to $25,000,000 in the aggregate ($12,500,000 from each of the 2024 Lenders), from time to time, subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. We have the right to pre-pay the entire amount outstanding under the 2024 Credit Facility at any time, before the 2024 Credit Facility’s maturity of December 31, 2025. The 2024 Credit Facility also contains customary events of default. The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least USD $50,000,000 in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement. On August 13, 2024, the Company entered into the First Amendment to the 2024 Credit Facility with the 2024 Lenders, to increase the borrowing limit of the 2024 Credit Facility to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders). On November 14, 2024, we entered into the Second Amendment to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) and to the 2024 Credit Facility with ERAS Capital LLC and Gerard Barron, to extend the maturity of the 2024 Credit Facility to December 31, 2025. In the three and nine months ended September 30, 2024, the Company drew $0.3 million and $4.2 million, respectively, from the 2024 Credit Facility.

### Off-Balance Sheet Arrangements

We are not party to any off-balance sheet arrangements.

### Critical Accounting Policies and Significant Judgments and Estimates

Our condensed consolidated interim financial statements have been prepared in accordance with U.S. GAAP. In the preparation of these financial statements, we are required to use judgment in making estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities as of the date of the financial statements, as well as the reported expenses incurred during the reporting periods. Our estimates are based on our historical experience and various other factors that we believe are reasonable under the circumstances, the results of which form the basis for making judgments about items that are not readily apparent from other sources. Actual results may differ from these estimates under different assumptions or conditions.

Except as described in Note 3 to our condensed consolidated interim financial statements included in this Quarterly Report on Form 10-Q, there have been no material changes to our critical accounting policies and estimates as compared to the critical accounting policies and estimates disclosed in our 2023 Annual Report on Form 10-K.

### Emerging Growth Company Status

Section 102(b)(1) of the Jumpstart Our Business Startups (“JOBS”) Act exempts emerging growth companies from being required to comply with new or revised financial accounting standards until private companies are required to comply with the new or revised financial accounting standards. The JOBS Act provides that a company can choose not to take advantage of the extended transition period and comply with the requirements that apply to non-emerging growth companies, and any such election to not take advantage of the extended transition period is irrevocable.

We are an “emerging growth company” as defined in Section 2(a) of the Securities Act and have elected to take advantage of the benefits of the extended transition period for new or revised financial accounting standards. Following the closing of the Business Combination, we expect to remain an emerging growth company at least through the end of the 2024 fiscal year and we expect to continue to take advantage of the benefits of the extended transition period at least through the end of the 2024 fiscal year, although we may decide to early adopt such new or revised accounting standards to the extent permitted by such standards. This may make it difficult or impossible to compare our financial results with the financial results of another public company that is either not an emerging growth company or is an emerging growth company that has chosen not to take advantage of the extended transition period exemptions because of the potential differences in accounting standards used.

### Cautionary Statements Regarding the NORI Initial Assessment and TOML Mineral Resource Statement

We have estimated the size and quality of our resource in the NORI and TOML Areas, as described below, in our SEC Regulation S-K (subpart 1300) compliant Technical Report Summary - Initial Assessment, of the NORI Property, Clarion-Clipperton Zone, Pacific Ocean dated March 17, 2021 (“NORI Initial Assessment”) and Technical Report Summary - TOML Mineral Resource, Clarion-Clipperton Zone, Pacific Ocean dated March 26, 2021 (“TOML Mineral Resource Statement”), respectively, prepared by AMC Consultants Ltd. (“AMC”). We plan to continue to estimate our resources in the NORI and TOML Areas and develop the project economics. The initial assessment included in the NORI Initial Assessment Report is a conceptual study of the potential viability of mineral resources in NORI Area D. This initial assessment indicates that development of the mineral resource in NORI Area D is potentially technically and economically viable; however, due to the preliminary nature of project planning and design, and the untested nature of the specific seafloor production systems at a commercial scale, economic viability has not yet been demonstrated.

The NORI Initial Assessment and TOML Mineral Resource Statement do not include the conversion of mineral resources to mineral reserves.

As used in this Quarterly Report on Form 10-Q or in the applicable report summary, the terms “mineral resource,” “measured mineral resource,” “indicated mineral resource” and “inferred mineral resource”, as applicable, are defined and used in accordance with the SEC Mining Rules.

You are specifically cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into mineral reserves, as defined by the SEC. You are also cautioned that mineral resources do not have demonstrated economic value. Information concerning our mineral properties in the NORI and TOML Technical Report Summaries and in this Quarterly Report on Form 10-Q includes information that has been prepared in accordance with the requirements of the SEC Mining Rules forth in subpart 1300 of Regulation S-K. Under SEC standards, mineralization, such as mineral resources, may not be classified as a “reserve” unless the determination has been made that the mineralization would be economically and legally produced or extracted at the time of the reserve determination. Inferred mineral resources have a high degree of uncertainty as to their existence and to whether they can be economically or legally commercialized. Under the SEC Mining Rules, estimates of inferred mineral resources may not form the basis of an economic analysis. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. A significant amount of exploration must be completed in order to determine whether an inferred mineral resource may be upgraded to a higher category. Therefore, you are cautioned not to assume that all or any part of an inferred mineral resource exists, that it can be economically or legally commercialized, or that it will ever be upgraded to a higher category. Approximately 97% of the NORI Area D resource is categorized as measured or indicated.

Likewise, you are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be upgraded to mineral reserves.

## Market risk

As filed, 1,992 characters.

We are exposed to a variety of markets and other risks including the effects of change in interest rates, inflation and foreign currency translation and transaction risks as well as risks to the availability of funding sources, hazard events, specific asset risks, regulatory risks, public policy risks and technology risks. We also expect to be exposed to commodity risks if and when we commence commercial production.

### Interest Rate Risk and Credit Risk

Interest rate risk is the risk that the fair value of our future cash flows and our financial instruments will fluctuate because of changes in market interest rates.

Our current practice is to invest excess cash in investment-grade short-term deposit certificates issued by reputable Canadian financial institutions with which we keep our bank accounts and management believes the risk of loss to be remote. We periodically monitor the investments we make and are satisfied with the credit ratings of our banks. Due to the current high cash need of our operating plan, we have kept our funds readily available, placed in secure, highly liquid interest-bearing investments, as at September 30, 2024.

Credit risk is a risk of loss that may arise on outstanding financial instruments should a counter party default on its obligation. Our receivables consist primarily of general sales tax due from the Federal Government of Canada and as a result, the risk of default is considered to be low. Once we commence commercial production, we expect our credit risk to rise with our increased customer base.

### Other Risks

We are exposed to a variety of markets and other risks including the effects of inflation and foreign currency translation, commodity pricing risks and transaction risks as well as risks to the availability of funding sources, hazard events specific asset risks, regulatory risks, public policy risks and technology risks. We also expect to be exposed to commodity risks if and when we commence commercial production.

## Controls and procedures

As filed, 5,790 characters.

### Evaluation of Disclosure Controls and Procedures

Under the supervision and with the participation of our management, including our Chief Executive Officer and Chief Financial Officer, we conducted an evaluation of the effectiveness of the design and operation of our disclosure controls and procedures, as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act.

Disclosure controls and procedures are controls and other procedures that are designed to ensure that information required to be disclosed in our reports filed or submitted under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms. Disclosure controls and procedures include controls and procedures designed to ensure that information required to be disclosed in our reports filed under the Exchange Act is accumulated and communicated to management, including our Chief Executive Officer and Chief Financial Officer, to allow timely decisions regarding required disclosure. Based on the evaluation of our disclosure controls and procedures, our Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures were not effective as of September 30, 2024, as a result of a material weakness in our internal control over financial reporting as described below.

### Material Weaknesses in Internal Control over Financial Reporting

As previously disclosed in our 2023 Annual Report on Form 10-K, management identified a material weakness in the operating effectiveness of our internal controls over the accounting for significant non-routine transactions that resulted from the inadequate and untimely involvement of stakeholders and technical advisors with an appropriate level of expertise to account for a non-routine, unusual and complex transaction. A material weakness is a deficiency, or a combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of our financial statements will not be prevented or detected on a timely basis.

This material weakness resulted in errors in the financial statements and related disclosures in our Quarterly Reports on Form 10-Q for the quarter ended March 31, 2023, and for the six months ended June 30, 2023 and nine months ended September 30, 2023. See Note 22 to the audited consolidated financial statements for the year ended December 31, 2023, included in our 2023 Annual Report on form 10-K for more information about these errors and our revisions to these previously issued financial statements in our financial statements as of and for the year ended December 31, 2023, as included in the 2023 Annual report on Form 10-K.

In order to remediate this material weakness, we have developed and rolled out training on processes and controls related to complex, non-routine transactions and evaluating the circumstances under which we use technical advisors in connection with evaluating complex, non-routine transactions. We are also considering engaging the assistance of additional third-party resources as deemed appropriate to assist management in its remediation efforts.

Our internal controls over significant non-routine transactions need to be in operation and tested for sufficient instances to be considered effective: such new controls will be tested with the next non-routine transaction. Consequently, the controls for non-routine transactions remain ineffective as of September 30, 2024.

Notwithstanding our material weakness, we have concluded that our unaudited condensed consolidated interim financial statements included in this Quarterly Report on Form 10-Q fairly present in all material respects our financial condition, results of operations and cash flows for the periods presented in conformity with U.S. GAAP.

### Changes in Internal Control over Financial Reporting

Except as noted above, there were no changes in our internal control over financial reporting identified in connection with the evaluation of such internal controls that occurred during the third quarter ended September 30, 2024 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

### Limitations on the Effectiveness of Disclosure Controls and Procedures

Our management, including our Chief Executive Officer and Chief Financial Officer, does not expect that our disclosure controls and procedures or internal control over financial reporting will prevent all errors and all fraud. A control system, no matter how well designed and implemented, can provide only reasonable, not absolute, assurance that the control system’s objectives will be met. Further, the design of a control system must reflect the fact that there are resource constraints and the benefits of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that all control issues within a company are detected. The inherent limitations include the realities that judgments in decision-making can be faulty and that breakdowns can occur because of simple errors or mistakes. Controls can also be circumvented by the individual acts of some persons, by collusion of two or more people, or by management override of the controls. Because of the inherent limitations in a cost-effective control system, misstatements due to error or fraud may occur and may not be detected. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions or that the degree of compliance with the policies or procedures may deteriorate.

## Risk factors

As filed, 21,253 characters.

You should carefully review and consider the information regarding certain factors that could materially affect our business, consolidated financial condition or results of operations set forth under Item 1A. Risk Factors in our 2023 Annual Report on Form 10-K. There have been no material changes from or additions to the risk factors disclosed in our 2023 Annual Report on Form 10-K other than the revised risk factors set forth below. We may disclose changes to risk factors or additional factors from time to time in our future filings with the SEC.

***Our business is subject to numerous regulatory uncertainties which, if not resolved in our favor, would have a material adverse impact on our business.***

On March 4, 2023 the United Nations finalized the UN High Seas Treaty. The treaty does not replace or amend UNCLOS, or the authority of the ISA, and must be interpreted consistently with the rights granted by the Convention.

To date, no commercial collection (also referred to as “mining,” “exploitation” or “harvesting”) of nodules has occurred on the seafloor in the area of the high seas beyond the limits of national jurisdiction (the “Area”), which includes the CCZ. Moreover, despite the release by the ISA of the Draft Regulations on Exploitation of Mineral Resources (the “Draft Regulations”), finalization of such regulations remains subject to approval and adoption by the ISA. Once adopted, these regulations will add to the legal and technical framework for exploitation of the polymetallic nodules in the NORI, TOML and Marawa contract areas.

Section 1, paragraph 15 of the 1994 Agreement Relating to the Implementation of Part XI of UNCLOS (the “1994 Agreement”) allows a member state whose national intends to apply for approval of a plan of work for exploitation to notify the ISA of such intention. This notice obliges the ISA to complete the adoption of exploitation regulations within two years of the request made by the member state.

On June 25, 2021, Nauru submitted such a notice, with an effective date of July 9, 2021, to the ISA requesting that it complete the adoption of rules, regulations and procedures (“RRPs” or the “Mining Code”) necessary to facilitate the approval of plans of work for exploitation in the Area. As a result of that notice, the ISA was required to adopt the relevant RRPs for exploitation by July 9, 2023. The ISA, however, did not adopt the RRPs for exploitation by the July 9, 2023 deadline. At its July 2023 session, the ISA released a road map for the finalization of the Mining Code, with a view to its adoption during the 30th session of the ISA in 2025. The road map included three scheduled ISA Council meetings through July 2024 to elaborate on the Mining Code. The Mining Code was not completed at the July 2024 ISA Council meetings and during these meetings, the ISA agreed to continue the negotiations of the Mining Code with a continued view to its adoption during the 30th session of the ISA in 2025. The ISA Council has scheduled two ISA Council meetings in March and July 2025 to progress the Mining Code and has agreed to continue working intersessionally to advance the text. Although we believe the ISA will adopt the Mining Code, there can be no assurances that the Mining Code will be adopted within this timeline, or at all, as a result of actions of ISA member States or otherwise. For example, at least 32 ISA member States out of the 169 ISA members have expressed reservations about the timing of commercialization of seafloor mineral resources and have called for a ban, moratorium, or precautionary pause on the commercialization of these resources. In addition, although the Draft Regulations and several supporting standards and guidelines are at an advanced stage, there remains uncertainty regarding the final form that these will take, as well as the impact that such regulations, standards and guidelines will have on our ability to meet our objectives.

As the ISA Council did not complete the adoption and elaboration of the Mining Code by the prescribed deadline of July 9, 2023, pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement, if an application for a plan of work for exploitation is now submitted to the ISA, the ISA is nonetheless required to consider and provisionally approve such a plan of work based on: (i) the provisions of the UNCLOS; (ii) any rules, regulations and procedures that the ISA may have adopted provisionally, (iii) the basis of the norms contained in the UNCLOS and (iv) the terms and principles contained in the 1994 Agreement, including the principle of non-discrimination among contractors.

NORI intends to submit an application to the ISA for an exploitation contract, which will include a plan of work for exploitation for the NORI contract area, expected to be filed on June 27, 2025. If the ISA has not adopted the final Mining Code by the time NORI submits this application, we believe that the ISA will review and provisionally approve the plan of work for exploitation included therein pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement discussed above. The ISA released its road map to finalize the Mining Code at its July 2023 session and at its July 2024 session agreed to continue the negotiations of the Mining Code with a continued view to its adoption during the 30th session of the ISA in 2025, however, it has also stated that the commercial exploitation of mineral resources in the ISA’s jurisdictional area should not be carried out in the absence of RRPs relating to exploitation. In addition, there can be no assurances that the ISA will come to a consensus as to the interpretation of Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement. Although we believe the ISA will accept and consider an application for a plan of work for exploitation in the absence of the final Mining Code, there is no consensus within the ISA as to the process to be followed for its consideration of such an application, including the involvement of the ISA’s Legal and Technical Commission (LTC) and whether and how long the ISA could delay its consideration of an application past the proscribed 60-day period. As a result, and to provide clarity on the application review process and timeline, the Republic of Nauru, in consultation with NORI, has formally requested that this issue be added to the agenda of the Council’s March 2025 meeting. We expect that this will allow Council to discuss and approve the process to be confirmed prior to NORI’s expected application submission date of June 27, 2025. In light of some ISA Member States calling for a ban, moratorium or precautionary pause on the commercialization of seafloor mineral resources, there can be no assurance that the ISA will provisionally approve our plan of work for exploitation, within one year from submission thereof, or at all, or that such provisional approval would lead to the issuance of an exploitation contract with the ISA. On August 2, 2024, the ISA Assembly elected Leticia Carvalho of Brazil as the new Secretary-General of the ISA for the period 2025-2028. There can be no assurances that the ISA’s stated target for adoption of the Mining Code of 2025 will be met or that any application for an exploitation contract will be approved before the final Mining Code is adopted.

The collection of polymetallic nodules within the CCZ, where our exploration areas are located, will require approval of an ISA Exploitation Contract (which will authorize commercial collection activities). As part of the application for an ISA Exploitation Contract, all contractors are required to complete baseline studies and an Environment and Social Impact Assessment (ESIA), culminating in an EIS, prior to collecting nodules at a commercial scale. The EIS would be accompanied by an Environmental Monitoring and Management Plan (EMMP) which is expected to specify the objectives and purpose of all monitoring requirements, the components to be monitored, frequency of monitoring, methods of monitoring, analysis required in each monitoring component, monitoring data management and reporting.

In order to move our exploration projects into commercial production, our wholly owned subsidiaries, NORI and TOML will each need to conclude an exploitation contract with the ISA, as will our partner, Marawa, in addition to obtaining related permits that may be required by our commercial partners. There can be no assurance that the ISA will approve our application for a plan of work for exploitation and issue an exploitation contract to our subsidiaries in a timely manner or at all. Even if the ISA timely evaluates such applications(s), our subsidiaries may be required to submit a supplementary EIS or perform additional studies or campaigns before obtaining approval. As such, there is a risk that an exploitation contract may not be granted by the ISA, may not be granted on a timely basis, thereby delaying our potential timeline for commercial exploitation, or may be granted on uneconomic terms.

Similarly, with respect to sponsoring State regulation, no assurance can be given that new rules and regulations will not be enacted or that existing rules and regulations will not be applied in a manner that would limit or curtail production or development by our subsidiaries. Amendments to current laws and regulations governing the operations and activities of deep-sea mineral resources companies, or changes in interpretation thereto, or the unwillingness of countries throughout the world to enforce such laws and regulations, could have a material adverse impact on our business, and could cause increases in exploration expenses, capital expenditures, production costs, or put the security of our equipment at risk to activism or piracy. Such amendments could also cause reductions in our future production, or the delay or abandonment in the development of our polymetallic mineral resource properties. There can be no certainty that actions by governmental and regulatory authorities, including changes in regulation, taxation and other fiscal regimes, will not adversely impact our projects or our business. Further, our operations depend on the continuation of the sponsorship agreements between our subsidiaries NORI and TOML and each of their host Sponsoring States, Tonga and Nauru, respectively. Each subsidiary has been registered and incorporated within such host nation and each host nation has maintained effective control, supervision, regulation, and sponsorship over the conduct of such subsidiary. While we have beneficial ownership over such subsidiaries, each subsidiary operates under the regulation and sponsorship of Nauru and Tonga. If such arrangement is challenged, or sponsorship is terminated, we may have to restructure the ownership or operations of such subsidiary to ensure continued State sponsorship. Failure to maintain sponsorship, or secure new state sponsorship, will have a material impact on such subsidiary and on our overall business and operations.

While the rates of payments are yet to be set by the ISA, the 1994 Agreement prescribes a relevant framework that the rates of payments “shall be within the range of those prevailing in respect of land-based mining of the same or similar minerals in order to avoid giving deep seabed miners an artificial competitive advantage or imposing on them a competitive disadvantage.” The ISA has held workshops with stakeholders to discuss and seek comments on the potential financial regime for the collecting of polymetallic nodules in the CCZ. There can be no assurance that the ISA will put in place a Mining Code in a timely manner or at all. Such regulations may also impose burdensome obligations or restrictions on us, and/or may contain terms that do not enable us to develop our projects.

In August 2024, as a result of a new process established by the LTC to identify contractors who may be at risk of non-compliance with obligations under their respective exploration contract, the ISA sent notifications of such potential risk of non-compliance to multiple contractors, including TOML and Marawa.

The LTC’s notification to TOML cited concerns, which relate mainly to the failure to conduct planned sampling campaigns, the need to submit digital data in the revised reporting templates, delays in surveys for environmental baseline development, and the delay in submission of its scoping report. TOML is in the process of responding to the notification and is positioned to take corrective action if necessary. The Company is confident that its response and corrective action(s) (if any) will be satisfactory to rectify the LTC’s concerns regarding TOML; however, no assurances can be given that the LTC will be fully satisfied. If the LTC deems TOML’s response insufficient or incomplete, or if TOML fails to respond, the LTC, in line with ISAB/29/LTC/5, may report TOML to Council for further consideration and action. If TOML is deemed to have not remedied all issues raised by the LTC, there is a risk of non-compliance and the ISA suspending some or all rights granted under the exploration license, which could include halting exploration activities, and in severe cases, termination of the exploration contract, which could have a material and adverse effect on our future business prospects and financial condition.

The LTC’s notification to Marawa cited concerns, which relate mainly to the lack of expedition work, absence of study activities or data submission, failure to provide a detailed exploration strategy, delays in conducting planned research cruises, and insufficient analysis of biological samples. If the LTC deems Marawa’s response insufficient or incomplete, or if Marawa fails to respond, the LTC, in line with ISAB/29/LTC/5, may report Marawa to Council for further consideration and action. If Marawa is deemed to have not remedied all issues raised by the LTC, there is a risk of non-compliance and the ISA suspending some or all rights granted under the exploration license, which could include halting exploration activities, and in severe cases, termination of the exploration contract.

***We are involved in litigation that may adversely affect us and may not be successful in our litigation related to non-performing Private Investment in Public Equity (“PIPE”) investors.***

Due to the nature of our business, we may be subject to regulatory investigations, claims, lawsuits and other proceedings in the ordinary course of our business. The results of these legal proceedings cannot be predicted with certainty due to the uncertainty inherent in litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges and juries and the possibility that decisions may be reversed on appeal. We can provide no assurances that these matters will not have a material adverse effect on our business. Following periods of volatility in the market, securities class-action litigation has often been instituted against companies. On October 28, 2021, a shareholder filed a putative class action against us and certain executives in federal district court for the Eastern District of New York, captioned Caper v. TMC The Metals Company Inc. F/K/A Sustainable Opportunities Acquisition Corp., Gerard Barron and Scott Leonard. The complaint alleges that all defendants violated Section 10(b) of the Exchange Act, and Rule 10b-5 promulgated thereunder, and Messrs. Barron and Leonard violated Section 20(a) of the Exchange Act, by making false and/or misleading statements and/or failing to disclose information about our operations and prospects during the period from March 4, 2021 to October 5, 2021. On November 15, 2021, a second complaint containing substantially the same allegations was filed, captioned Tran v. TMC the Metals Company, Inc. These cases have been consolidated. On March 6, 2022, a lead plaintiff was selected. An amended complaint was filed on May 12, 2022, reflecting substantially similar allegations, with the Plaintiff seeking to recover compensable damages caused by the alleged wrongdoings. We deny any allegations of wrongdoing and filed and served the plaintiff a motion to dismiss on July 12, 2022 and intend to defend against this lawsuit. On July 12, 2023, an oral hearing on the motion to dismiss was held. The parties are currently awaiting a ruling. On January 23, 2023, investors in the 2021 private placement from the Business Combination filed a lawsuit against us in the Commercial Division of New York Supreme Court, New York County, captioned Atalaya Special Purpose Investment Fund II LP et al. v. Sustainable Opportunities Acquisition Corp. n/k/a TMC The Metals Company Inc., Index No. 650449/2023 (N.Y. Sup. Ct.). We filed a motion to dismiss on March 31, 2023, after which the plaintiffs filed an amended complaint on June 5, 2023. The amended complaint alleges that we breached the representations and warranties in the plaintiffs’ private placement Subscription Agreements and breached the covenant of good faith and fair dealing. The Plaintiffs are seeking to recover compensable damages caused by the alleged wrongdoings. We deny any allegations of wrongdoing and filed a motion to dismiss the amended complaint on July 28, 2023. On December 7, 2023, the Court granted our motion to dismiss the claim for breach of the covenant of good faith and fair dealing and denied our motion to dismiss the breach of the Subscription Agreement claim. We filed a notice of appeal regarding the Court’s denial of our motion to dismiss the breach of the Subscription Agreement claim and the appeal was heard by the Court on November 8, 2024. The parties are currently awaiting a ruling. There is no assurance that we will be successful in our defense of this lawsuit or that insurance will be available or adequate to fund any settlement or judgment or the litigation costs of this action. Such losses or range of possible losses cannot be reliably estimated.

We expected to receive approximately $330 million of proceeds in the private placement that closed on September 9, 2021 in connection with the Closing but only received $110.3 million (net of transactions costs). On September 20, 2021, we commenced litigation in the New York Superior Court, New York County against two investors who failed to fund their commitments pursuant to subscription agreements entered into in connection with the expected financing. These actions are captioned Sustainable Opportunities Acquisition Corp. n/k/a TMC the metals company Inc. v. Ethos Fund I, LP, Ethos GP, LLC, Ethos DeepGreen PIPE, LLC, and Ethos Manager, LLC, Index No. 655527/2021 (N.Y. Sup. Ct.) and Sustainable Opportunities Acquisition Corp. n/k/a TMC the metals company Inc. v. Ramas Capital Management, LLC, Ramas Energy Opportunities I, LP, Ramas Energy Opportunities I GP, LLC, and Ganesh Betanabhatla, Index No. 655528/2021 (N.Y. Sup. Ct.). The operative complaints allege that the investors breached the relevant subscription agreement and that the investors’ affiliates tortiously interfered with the subscription agreements by causing the investor not to fund its contractual obligations. We are seeking compensatory damages (plus interest), expenses, costs, and attorneys’ fees. There can be no assurances, however, that we will be successful in our efforts against these investors.

On November 8, 2024, a shareholder filed a putative class action against us and certain executives in federal district court for the Central District of California, captioned Lin v. TMC The Metals Company Inc., Gerard Barron, and Craig Shesky. The complaint alleges that all defendants violated Section 10(b) of the Exchange Act and Rule 10b-5 promulgated thereunder, and Messrs. Barron and Shesky violated Section 20(a) of the Exchange Act, by making false and/or misleading statements and/or failing to disclose information regarding the classification of the non-financial asset received from our partnership with Low Carbon Royalties Inc. and the derecognition of the capitalized exploration contract related to NORI. The alleged misstatements and omissions pertain to our initial classification of this non-financial asst as a gain on disposition (being a sale of future revenue) and subsequent reclassification thereof as a royalty liability (and re-capitalization of the exploration contract) and the restatement of our previously issued financial statements as a result thereof for the three months ended March 31, 2023, the six months ended June 30, 2023 and the nine months ended September 30, 2023 in March 2024.

The complaint purports to represent a class of shareholders who acquired our securities between May 12, 2023, and March 25, 2024, and seeks to recover compensable damages caused by the alleged wrongdoings. We intend to defend against the lawsuit. There can be no assurance, however, that we will be successful in our defense, or that insurance will be available or adequate to fund any settlement or judgment or the litigation costs of this action. Due to the early stage of this litigation, such losses or range of possible losses cannot be reliably estimated.

Filed Nov 15, 2024.