# Comstock Inc.: Form 10-Q for the period ended Mar 31, 2015

- Company: [Comstock Inc.](/companies/lode.md) (CIK 1120970)
- Form: 10-Q
- Filed: 2015-04-16
- Accepted by EDGAR: Apr 15, 2015, 20:25 ET
- Period: 2015-03-31
- Accession: 0001120970-15-000013
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1120970/000112097015000013/lode-2015331x10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1120970/000112097015000013/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2015-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2015-01-01 to 2015-03-31 | $6.0m | us-gaap:Revenues |
| Operating income | 3 months, 2015-01-01 to 2015-03-31 | −$1.7m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2015-01-01 to 2015-03-31 | $223.7k | us-gaap:InterestExpense |
| Income tax | 3 months, 2015-01-01 to 2015-03-31 | $0 | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2015-01-01 to 2015-03-31 | $1.3m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2015-01-01 to 2015-03-31 | $0.01 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2015-01-01 to 2015-03-31 | $0.01 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2015-01-01 to 2015-03-31 | 136,101,769 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2015-01-01 to 2015-03-31 | $209.5k | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2015-01-01 to 2015-03-31 | $3.1m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2015-03-31 | $4.2m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2015-03-31 | $8.2m | us-gaap:AssetsCurrent |
| Total assets | at 2015-03-31 | $48.2m | us-gaap:Assets |
| Current liabilities | at 2015-03-31 | $12.4m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2015-03-31 | $24.7m | us-gaap:Liabilities |
| Shareholders' equity | at 2015-03-31 | $23.6m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 35,511 characters.

The following discussion provides information that we believe is relevant to an assessment and understanding of the consolidated results of operations and financial condition of the Company. It should be read in conjunction with the condensed consolidated financial statements and accompanying notes also included in this Form 10-Q and our Annual Report on Form

10-K as of, and for the fiscal year ended December 31, 2014.

The following discussion addresses matters we consider important for an understanding of our financial condition and results of operations as of and for the three month period ended March 31, 2015, as well as our future results.

### Overview

The Company is a producing, Nevada-based, gold and silver mining company with extensive, contiguous property in the historic Comstock and Silver City mining districts (collectively, the “Comstock District”). The Comstock District is located within the western portion of the Basin and Range Province of Nevada, between Reno and Carson City. The Company began acquiring properties and developing projects in the Comstock District in 2003. Since then, the Company has consolidated a substantial portion of the Comstock District, secured and expanded permits, built an infrastructure and brought the exploration project into production.

Because of the Comstock District’s historical significance, the geology is well known and has been extensively studied by the Company, our advisors and many independent researchers. We have expanded our understanding of the geology of the project area through vigorous surface mapping, geophysical analysis, exploration drilling, drill hole logging and extensive geological cross-sectional analysis and mine planning. The volume of geologic data is immense, and thus far the reliability has been excellent, particularly in the various Lucerne Mine areas. We have amassed a large library of historic data and detailed surface mapping of Comstock District properties and continue to obtain historic information from private and public sources. We use such data in conjunction with information obtained from our current mining operations, to target geologically prospective exploration areas and plan exploratory programs, including drilling.

Our Lucerne Resource area is located in Storey County, Nevada, approximately three miles south of Virginia City and 30 miles southeast of Reno. Our Dayton Resource area is located in Lyon County, Nevada, approximately six miles south of Virginia City. Access to the properties is by State Route 342, a paved highway.

Our business plan is to deliver stockholder value by validating qualified resources (measured and indicated) and reserves (proven and probable) of at least 3,250,000 gold equivalent ounces from our first two resource areas, Lucerne and Dayton; and significantly grow the commercial development of our operations through coordinated district wide plans that are economically feasible and socially responsible. The Company has already met the first three intermediate resource objectives by validating measured and indicated resources containing more than 2,000,000 gold equivalent ounces. The Company achieved initial production and held its first pour of gold and silver on September 29, 2012. The Company produced approximately 20,815 and 22,925 gold equivalent ounces in 2013 and 2014, respectively. That is, the Company produced 17,739 ounces of gold and 186,482 ounces of silver in 2013, and 19,601 ounces of gold and 222,416 ounces of silver in 2014. The Company increased production every quarter during 2014, exiting the year at an annualized weekly rate of approximately 36,000 gold equivalent ounces per year, with December 2014, totaling 3,176 gold equivalent ounces, the highest month since production started.

We continue acquiring additional properties in the Comstock District, expanding our footprint and creating opportunities for exploration and mining. The Company now owns or controls approximately 8,332 acres of mining claims and parcels in the Comstock and Silver City Districts. The acreage is comprised of approximately 2,213 acres of patented claims (private lands) and surface parcels (private lands) and approximately 6,119 acres of unpatented mining claims, which the Bureau of Land Management (“BLM”) administers.

### Current Projects

The Company’s headquarters, mine operations and heap leach processing facility are in Storey County, Nevada, at 1200 American Flat Road, approximately three miles south of Virginia City, Nevada and 30 miles southeast of Reno, Nevada. The Company has focused development to date on the Lucerne Resource Area (including both surface and underground east-side targets within this area), the Dayton Resource Area and the Spring Valley exploration target. We also plan on focusing future exploration on the Northern Extension, Northern Targets, and Occidental Target Areas subsequent to the exploration and development of Lucerne, Dayton and Spring Valley. Production is ongoing in the Lucerne Mine.

In early February, the Nevada Department of Transportation, (NDOT), closed an approximate two-mile section of SR-342, south of Gold Hill, as a safety precaution following roadway cracking and area specific sinking during a weekend of heavy rains. The area of sinking is above a historic mine-shaft dating back to the early 1900's, and that portion of the road sits on old mine dumps and looser fill that has a history of instability and, in some cases, failure. The Company owns the land, with NDOT granted prescriptive rights to operate the state roadbed over that private land. Storey County, NDOT, the Company, and other applicable regulatory agencies evaluated several remedies for the realignment of SR-342. The route will be realigned to the east of the historic shaft, enabling safe travel, continuing operations and important reclamations, while positioning the area for future mining and development.

The realignment will occur over two phases, with Phase 1 completion taking approximately 10-12 weeks and Phase 2 requiring an additional six months. Phase 1 begins with the Company removing the unconsolidated fill that now exists above the base bedrock level and beneath the existing road, followed by construction of a bypass road upon the base bedrock. In connection with this project, the historic Silver Hill Shaft will be capped permanently.

During the construction of Phase 1, SR-342 remains closed. Through traffic continues detouring through nearby State Route 341, commonly known as the truck route. The truck route provides direct access between Virginia City and U.S. 50 in the Dayton area, with about 1.5 miles of additional travel.

Once Phase 1 is complete in June, the road will be reopened during construction of the second phase. Phase 2 includes removal of additional material on the east side of the canyon and will conclude with a tie in of the south end of the newly constructed alignment. A short closure will be necessary toward the end of Phase 2 for the tie in and completion of the realignment. The project is estimated to last through December of 2015 with an estimated cost of $3 million.

Upon completion of the bypass, NDOT’s prescriptive rights to operate the road would be transferred from the existing closed section of State Route 342 to the new roadway alignment.

#### Exploration and Development (including Underground)

In December 2014, the Company launched the 2014-2015 exploration and development drilling program (the “Program”) with four major objectives, 1) expanding the Lucerne East-side gold and silver resources, mine plan and current surface mining into the Company’s newly permitted area; 2) accelerating underground feasibility studies and developing high-grade, underground mine plans for that same newly permitted area; 3) expanding the Dayton gold and silver resources and developing a mine plan for potential future production; and 4) establishing a third major resource in the Spring Valley target area.

The drill program designed to determine the near-surface mineralized zones on the Succor and Holman mineral patents has been completed. Since reporting the initial high-grade intercepts in February 2015, based on 30 additional drill holes, the Company has further defined a zone of high-grade mineralization on these patents. The drill holes targeted near-surface vein outcrops, their down-dip extensions and certain infill objectives. All data to date suggest the Succor and Holman claims have excellent potential for economic mining and metal recovery. The next phase consists of core and reverse circulation drilling, both on the surface and underground, expanded resource estimation and extended mine plans.

The current drill program resulted in the following summary of intercepts:

Table 1: Summary of Drill Program

|  | Succor | Holman |
| --- | ---: | ---: |
| No. Holes Drilled | 80 | 39 |
| Strike Length Drilled (ft) | 700 | 575 |
| No. 10’ intervals with intercepts \>.015 Au opt. | 166 | 55 |
| No. 10’ interval with intercepts \>.100 Au opt. | 22 | 3 |
| No. drill holes with intercepts \>.100 Au opt. | 20 | 2 |

Table 2: Average Grades for Drill Intercepts Greater than .015 Au opt.

|  | Succor | Holman |
| --- | ---: | ---: |
| Avg Au opt. | 0.056 | 0.047 |
| Avg Ag opt. | 0.259 | 0.333 |

The Company commenced production in 2012, from a surface mining operation along a half-mile long segment of the Silver City branch of the lode and, in 2014, began shifting to the exploration and development of near-surface parts of the mineralized system lying within a short distance of current Lucerne operations (the Eastside operations). The Company’s current resource estimate does not include any of the results of the 2014 and 2015 drill holes.

Lucerne’s eastern exploration commenced in December 2014, with the completion of 119 drill holes in an area encompassed by the historic Succor and Holman mines. In the case of both mines, mineralization takes the form of moderately dipping quartz-calcite stock-work veining within the Miocene Alta Andesite. The primary objective of the Eastside drilling program was to accurately define the near-surface mineralization in the Succor and Holman areas because surface outcrops are limited. Drill hole spacing was also tightened, where practical, to 50 feet or less. The drilled strike lengths along the Succor and Holman zones totaled approximately 700 feet and 575 feet, respectively. The average depth of drilling was approximately 100 feet.

Due to the shallow nature of the program, the Company utilized a standard blast-hole rig. All samples were analyzed for gold and silver at the Company’s existing, on-site production assay lab utilizing standard fire assay techniques. This drill program was intended to complement previous work from 2011 and 2012 which generated significant drill intercepts up to 300 feet down-dip on a portion of the Succor mineralized system.

Additional drilling on both the Succor and the Holman is required to define the extent and continuity of mineralization below depths of 100 feet. That drilling, utilizing primarily core drilling standards, is planned for the spring of 2015. Preliminary geological and engineering evaluation, including the development of grade shells and a block model, will be conducted concurrently with the drill program. Preliminary metallurgical work has also been initiated on representative drill samples from the Succor and Holman drill program. This work includes standard bottle-roll procedures to test the mineralized materials’ amenability to existing heap-leach processes.

The Company has recently expanded its near-surface drilling and development program to include the Dayton Resource Area, south of Lucerne, in Lyon County. The first phase of Dayton drilling will mirror the sample procedures of the Succor and Holman area using an efficient blast-hole rig to define near-surface mineralization. Preliminary results are pending; however, the drilling has clearly outlined a southerly extension to one of the principle Dayton structures that hosts an expanded deposit. Once complete, further core and reverse circulation definition and infill drilling, including third-party laboratory sample analysis, will commence later this spring, followed by resource estimation and final mine planning.

#### Underground Development

The Company recently completed extensive geological development and modeling, incorporating all available data, including existing drill holes and historic underground mine maps, amongst other geological information and is preparing to develop the underground portion of the drill program.

The sectional compilation resulted in several important findings. The work confirmed that the lode is comprised of a group of northwest trending, sub-parallel mineralized structures, rather than a simple vein system confined to a single fault zone. These structural groups coalesce into a single zone in the central part of the East-side area and diverge to the north and south to create zones up to 600-feet wide. The Company also discovered dike-like masses of quartz porphyry that have intruded into the main lode and have a direct relationship to the known mineralization.

Out of this extensive geologic work a definitive underground target has emerged, specifically that part of the lode occupied by the above described mineralized mass of quartz porphyry, as well as the neighboring wall rocks. This conclusion is based on surface drill hole results, metallurgy, and proximity to the current Lucerne Mine floor, as well as past mining knowledge.

The results from the underground program will be incorporated into existing sectional data and, along with newly derived grade shells and grade models, an initial, phased internal reserve model will be created for this area. Developing a new underground access to the quartz porphyry structures and the almost adjacent Woodville Bonanza structures represents a significant opportunity for an accelerated, efficient underground mine plan in the Lucerne Area.

#### Evaluation of Existing Mine Dumps

During late summer through autumn of 2014, the geological and environmental teams undertook a systematic evaluation of historic mine dumps throughout most of the central part of the District. Quantifying and understanding the nature of legacy contaminants and identifying the extent of mineralization with potential to increase mineable resources were the two primary objectives. Overall, significant tonnages of mineralized dump materials were quantified. Most tonnages are directly to the east of the Lucerne mine and average around 0.025-0.035 opt Au. Dumps sampled for this evaluation are located within Gold Canyon, Storey County, on the east side of SR 342, and west of Silver City in Lyon County. Dumps sampled include the Silver Hills-Donovan (Eastside), Woodville, Lady Washington, Keystone, New York, and Oest. Total tonnages inventoried total over 640,000 tons.

#### Production

During 2014, the Company completed its second full year of production and transitioned from Billie the Kid and Hartford patented claims in the Lucerne West-side Mine to the higher-grade Justice and Lucerne patents, also in the Lucerne West-side Mine. The Company completed the planned mining for the Billie the Kid, Hartford and Justice patents during 2014, while continuing to mine the Lucerne patent through 2014 and 2015. The Company also expanded its activities to certain historic mine dumps in March 2015. The Company operates a heap leach based, gold and silver production system, including a zinc-precipitate based Merrill-Crowe processing plant. The Company, under the existing water pollution control permit with the State of Nevada, has the crushing and processing capacity to operate at a rate of up to 4.0 million tons of material crushed and stacked, per annum. The Merrill Crowe system facilitates that capacity with an operating fluid processing rate of over 1,000 gallons per minute. In March 2015, the Company completed construction of a ninth heap leach pad cell. The Company's nine cells continue under solution until the target gold and silver recovery rates have been achieved.

The following table presents mining operations and production for the first quarter of 2015 and 2014:

| Mining Operations | 1Q 2015 | 1Q 2014 |
| --- | ---: | ---: |
| Tons Mined | 316,199 | 947,852 |
| **Processing** |  |  |
| Tons Crushed | 157,612 | 205,686 |
| Weighted Average Grade Per Ton Au | 0.039 | 0.024 |
| Weighted Average Grade Per Ton Ag | 0.734 | 0.345 |
| Estimated Au Ounces Stacked | 6,083 | 5,016 |
| Estimated Ag Ounces Stacked | 115,689 | 70,989 |
| Estimated Au Equivalent\* Ounces Stacked | 7,669 | 6,140 |
| Au Ounces Poured and Sold | 4,695 | 4,507 |
| Ag Ounces Poured and Sold | 56,482 | 49,358 |
| Au Equivalent\* Ounces Poured | 5,470 | 5,290 |
| \* Au Equivalent ounces = Au ounces (actual) + (Ag ounces (actual) ÷ the ratio of average gold to silver prices) | 72.91 | 63.14 |

The following table presents weighted average grades of gold and silver by quarter:

|  | Weighted Average per ton Gold | Weighted Average per ton Silver |
| --- | ---: | ---: |
| Q1, 2014 | 0.024 | 0.345 |
| Q2, 2014 | 0.034 | 0.546 |
| Q3, 2014 | 0.026 | 0.564 |
| Q4, 2014 | 0.039 | 0.680 |
| **2014 YTD** | **0.030** | **0.527** |
| Q1, 2015 | 0.039 | 0.734 |

During the first quarter of 2015, the Company poured 4,695 ounces of gold and 56,482 ounces of silver, representing a 4.2% and 14.4% increase, for gold and silver, respectively, over the first quarter of 2014. The Company mined approximately 316 thousand tons of material (mineralized material and waste). Total mineralized material delivered to the leach pad was 157,612 tons.

Gold and silver grades continued improving as compared to 2014, and the weighted average for the first quarter of 2015, was 0.039 ounces per ton gold and 0.734 ounces per ton silver as compared to a weighted average for the first quarter of 2014, of 0.024 ounces per ton gold and 0.345 ounces per ton silver, representing a 63% and 113% increase, respectively.

Throughout the first three months of 2015, the Company realized an average price of $1,280.25 price per ounce of gold and a $15.94 average sales price per ounce of silver. In comparison, commodity market prices in the first three months of 2015 averaged $1,219.22 per ounce of gold and $16.72 per ounce of silver.

Our Comstock exploration activities include open pit gold and silver test mining. As defined by the Securities Exchange Commission (“SEC”) Industry Guide 7, we have not yet established any proven or probable reserves at our Comstock Lode Project.

### Operating Costs

During the first three months of 2015, actual costs applicable to mining revenue were approximately $4.6 million, $3.7 million net of silver credits as compared to $5.8 million, $4.8 million net of silver credits during the first three months of 2014. Costs applicable to mining revenue include mining and processing labor, maintenance, drilling and blasting and assaying costs, among others. Costs applicable to mining revenue for the first three months of 2015 and 2014 also include depreciation of $1.5 million and $1.3 million, respectively.

During the first quarter, the Company continued reducing costs applicable to mining revenue, targeting over $5 million in reductions this year, as compared to 2014. The Company has already realized $1.0 million of savings from reduced labor, drilling and blasting and fuel in the first quarter of 2015, as compared to the first quarter of 2014. The Company has also identified $1.5 million of potential cost reductions in all other non-mining activities, including general, administrative, land and environmental areas and has already realized $0.3 million in the first quarter of 2015, as compared to the first quarter of 2014. The Company incurred $0.4 million in severance costs during the first quarter, in mining and general and administrative expenses, associated with streamlining the organization and cost reduction activities.

### 2015 Outlook

The Company expects positive net income and positive cash flow from all operating and investing activities throughout 2015, while expanding mining activities during the third quarter, including exploration and development of an underground Lucerne mine, a second Dayton mine plan and commencing the Dayton permitting.

Through the end of 2014, the Company continued transitioning into production at higher rates and grades with lower sustainable costs. Under our current mine plan, the Company anticipates expanding operations to the east side of the Lucerne pit accessing material at lower stripping ratios and consistent and higher grades. The Company continues to focus on increasing production and expects to realize additional cost savings into 2015 by synchronizing operations, lowering strip ratios and realizing additional savings in non-mining operating expenses.

During fiscal year 2014, actual Lucerne Mine costs applicable to mining revenue were $23.3 million, or $19.1 million net of silver by-product credits as compared to $30.6 million, or $26.5 million net of silver by-product credits in 2013, a 24% reduction. The Company anticipates additional cost reductions of $5 million in 2015, expecting to reduce the $23.3 million to $18.3 million, before silver credits. The Company has also identified $1.5 million of potential cost reductions in all other non-mining activities, including general, administrative, land and environmental areas.

#### Recent Developments

On March 20, 2015, the Company entered into an agreement to lease the Gold Hill Hotel. The lease is effective April 1, 2015. The Company retains ownership to the land and Gold Hill Hotel properties while leasing the facilities to independent operators. Historically, the hospitality segment operated at a net loss but based on the current lease agreement, the Company does not expect any future net losses and more likely, prospective net lease and rental income.

### Land and Mineral Right Purchases

The Company continues to increase its footprint in the Comstock District through strategic acquisitions. The Company considers the historic Comstock District central to its growth strategy. The following acquisitions described below were completed in the first quarter of 2015.

During the first quarter, the Company completed various purchases of land and buildings totaling over 11 acres of land in Gold Hill, Nevada, including properties adjacent to the mining and processing operation, with purchase prices totaling approximately $1.7 million, including the issuance of 15,000 restricted shares of common stock as part of the purchase of one of the properties.

### Comparative Financial Information

The Company had two operating segments as of March 31, 2015; mining and hospitality. As we continue to focus on the increased productivity of our mining operations, our hospitality segment has become immaterial to our consolidated financial position, results of operation, and cash flows for the three months ended March 31, 2015.

The comparative financial information is reflected in the following table:

#### Three Months Ended:

|  | March 31, 2015 | March 31, 2014 | Change |
| --- | ---: | ---: | ---: |
| Revenue - Mining | $5,927,174 | $5,606,064 | $321,110 |
| Revenue - Hospitality | 110,243 | 157,397 | (47,154) |
| Costs applicable to mining revenue | 3,717,911 | 4,762,901 | (1,044,990) |
| Hospitality operating costs | 200,027 | 286,299 | (86,272) |
| Exploration and mine development | 603,194 | 801,218 | (198,024) |
| Mine claims and costs | 764,107 | 952,522 | (188,415) |
| Environmental and reclamation | 280,112 | 172,215 | 107,897 |
| General and administrative | 2,145,234 | 2,191,970 | (46,736) |
| Loss from operations | (1,673,168) | (3,403,664) | 1,730,496 |
| OTHER INCOME (EXPENSE) |  |  |  |
| Change in fair value of derivatives | — | (235,207) | 235,207 |
| Interest expense | (223,673) | (186,330) | (37,343) |
| Other income (expense) | 3,185,955 | 222 | 3,185,733 |
| NET INCOME (LOSS) | $1,289,114 | $(3,824,979) | $5,114,093 |

Mining revenue in the first quarter of 2015 was $5.9 million. The increase of $0.3 million, or 5.7%, from the first quarter of 2014, as compared to 2015, resulted from 4.2% more gold ounces sold, or about 188 ounces and a higher average price of $1,280.25 per ounce in the first quarter of 2015, versus an average price of $1,251.39 per ounce from the first quarter of 2014, an increase of $28.86 per ounce, or a 2.3% improvement.

Throughout the three months ended March 31, 2015, the Company realized an average price of $1,280.25 per ounce of gold and a $15.94 average sales price per ounce of silver. In comparison, commodity market prices in the first quarter of 2015 averaged $1,219.22 per ounce of gold and $16.72 per ounce of silver.

Costs applicable to mining revenue reflect a decrease of approximately $1.0 million from the first quarter of 2014 to the first quarter of 2015. The Company lowered labor, equipment and drill and blast costs, and fuel consumption, primarily due to a lower strip ratio and lower fuel prices, when compared to the first quarter of 2014. The Company also reduced its mine and support labor force by 29 employees during the first quarter of 2015.

General and administrative expenses, inclusive of professional and consulting fees, decreased by $0.1 million compared to the period ended March 31, 2014. The change is primarily the result of lower labor costs of $0.5 million, offset by severance costs of approximately $0.4 million during the quarter.

Change in fair value of derivatives decreased by $235,207 in the first quarter of 2015 as compared to the first quarter of 2014. This change is primarily the result of the release of debt derivative obligation related to a make whole provision in the agreement with The Golden Goose Mine for the purchase of the properties in the Dayton Resource Area.

Other income (expense) increased approximately $3.2 million in the first quarter of 2015 as compared to the first quarter of 2014. On October 20, 2010, the Company exchanged all of its senior secured convertible and senior indebtedness owed to members of the Winfield Group, shareholders of the Company, for newly created Series A-1 preferred stock. As part of the exchange, the Company agreed to indemnify the Winfield Group for any amounts as part of the exchange that were determined to be taxable as ordinary income to each member of the Winfield Group. As a result of this transaction, the Company recorded an accrual loss contingency provision in 2010. In September 2014, a portion of the indemnity lapsed. In March 2015, the remaining portion of the indemnity has lapsed, and accordingly, the Company recognized a reduction in the loss contingency accrual of approximately $3.2 million, which is included in other income in the condensed consolidated statements of operations.

Net income was $1.3 million for the three months ended March 31, 2015, and net loss was $3.8 million for the three months ended March 31, 2014. The change of $5.1 million is primarily the result of the elimination of the tax contingencies and additional, focused activities on costs reductions, primarily in labor, drill and blast, equipment and fuel driven by a lower strip ratio.

### Liquidity and Capital Resources

Total current assets were $8.2 million at March 31, 2015. Cash and cash equivalents on hand at March 31, 2015 totaled $4.2 million. Inventories, stockpiles, and mineralized material on leach pad totaled $2.3 million.

On March 5, 2015, the Company reached an agreement to draw on a restated $8 million revolving credit facility (the “Revolving Credit Facility”) with Auramet International, LLC (“Auramet”), pursuant to which the Company may borrow up to $8 million. The proceeds from the Revolving Credit Facility will primarily be used for an accelerated construction schedule for rerouting State Route 342, located in the Company’s Lucerne Resource Area, the first phase of which is scheduled for completion in early June 2015, and the second phase before 2015 year end. On March 6, 2015, the Company drew $5 million representing cash proceeds of approximately $4.4 million, net of prepaid interest of approximately $0.4 million, and other fees of approximately $0.2 million. The Company and Auramet agreed to re-advance under the Revolving Credit Facility evidenced by the Note and extend up to $8 million of availability thereunder for the period from and after June 30, 2015 to April 29, 2016.

Net cash generated by operating activities was a positive $0.2 million for the three months ended March 31, 2015, as compared to a use of cash of $2.4 million for the three months ended March 31, 2014. Our positive cash flow from operating activities in the first three months of 2015, was primarily from operating income associated with lower labor, blasting, fuel and equipment rental costs relative to production of mineralized material during the first quarter of 2015. Our use of cash in the first three months of 2014, was primarily from operating losses associated with higher mining costs relative to revenue due to a relatively higher ratio of waste to ore.

Net cash used in investing activities was $3.1 million for the three months ended March 31, 2015, primarily from $1.7 million for strategic land purchases and $1.1 million for the expansion of the processing facility, and approximately $0.3 million for other capital expenditures and bonding. Net cash used in investing activities for the three months ended March 31, 2014, was $1.3 million, primarily from $1.1 million for the purchase of mining vehicles, $0.3 million for increased bonding, offset by $0.2 million from proceeds from the sale of certain mining equipment.

Net cash provided by financing activities for the three months ended March 31, 2015, was $1.8 million, comprised of proceeds of $4.4 million from the revolving credit facility (the “Revolving Credit Facility”) with Auramet International, LLC, partially off-set by the pay-down of other long-term debt obligations of approximately $2.7 million. Net cash provided by financing activities for the three months ended March 31, 2014 was $3.9 million, comprised of proceeds of $4.6 million from the revolving credit facility (the “Revolving Credit Facility”) with Auramet International, LLC, partially off-set by the pay-down of other long-term debt obligations of approximately $0.8 million.

The Company was an exploration company for most of its existence and transitioned into production in the Lucerne Mine late in 2012, and accordingly, has incurred net operating losses and negative cash flows from operations in 2012, 2013 and 2014 and net operating income in the first quarter of 2015. The Company continues reducing costs applicable to mining and related costs. The Company realized annual mining, mine development and related savings of approximately $8.4 million from reduced staffing in crushing, related maintenance, mining, drilling and blasting, logistics and additional $3.3 million in administration cost reductions, totaling approximately $11.7 million, year over year savings in 2014. This positive cost savings trend continues in 2015. The Company has realized an additional $1.4 million of savings from reduced drilling and blasting, fuel, equipment rental, labor and reduced strip ratio in the first quarter of 2015, as compared to the first quarter of 2014.

The accompanying unaudited condensed consolidated financial statements have been prepared assuming the Company will continue as a going concern which considers the realization of assets and discharge of liabilities in the normal course of business and does not include any adjustments that might result from the outcome of uncertainties noted below.

The Company had net losses from operations in 2012, 2013 and 2014 and a net income from operations for the period ended March 31, 2015 and an accumulated deficit of $187.3 million at March 31, 2015. For the three month period ended March 31, 2015, the Company realized net income of $1.3 million and $0.2 million of cash provided by operations. As of March 31, 2015, the Company had cash and cash equivalents of $4.2 million, current assets of $8.2 million and current liabilities of $12.4 million, resulting in current liabilities in excess of current assets of $4.2 million.

The Company’s current capital resources include cash and cash equivalents and other working capital resources, cash generated through operations, and existing financing arrangements, including revolving credit facility (the “Revolving Credit Facility”) with Auramet International, LLC ("Auramet"), pursuant to which the Company may have borrowings up to $8 million outstanding at any given time. The Revolving Credit Facility has a maturity of February 6, 2017 and allows for re-advances on the facility up to the $8 million availability. The Company has financed its exploration, development, and start up activities principally from the sale of equity securities and, to a lesser extent, debt financing. While the Company has been successful in the past in obtaining the necessary capital to support its operations, including registered equity financings from its existing shelf registration, borrowings, or other means, there is no assurance that the Company will be able to obtain additional equity capital or other financing, if needed. The Company believes it will have sufficient funds to sustain its operations during the next 12 months as a result of the sources of funding detailed above.

Future production rates and gold prices below management’s expectations would adversely affect the Company’s results of operations, financial condition and cash flows. If the Company was unable to obtain any necessary additional funds, this could have an immediate material adverse effect on liquidity and could raise substantial doubt about the Company’s ability to continue as a going concern. In such case, the Company could be required to limit or discontinue certain business plans, activities or operations, reduce or delay certain capital expenditures or sell certain assets or businesses. There can be no assurance that the Company would be able to take any of such actions on favorable terms, in a timely manner or at all.

The Revolving Credit Facility with Auramet International, LLC, contains a covenant that requires the Company to maintain a minimum liquidity balance of $1 million (including cash and cash equivalents, plus 90% of the value of any doré that has been picked up by a secured carrier but not yet paid for, as of any date of determination). The Revolving Credit Facility additionally contains customary representations, warranties, affirmative covenants, negative covenants, and events of default, as well as conditions to borrowings. The Company is in compliance with all required covenants.

For the remainder of 2015, the Company plans on spending approximately $3.5 million in capital expenditures, primarily the road realignment project and some infrastructural development. The Company also plans to pay down an additional $6.6 million in debt obligations, including $3.4 million on the Revolving Credit Facility.

### Critical Accounting Policies And Estimates

There have not been any material changes to the critical accounting policies and estimates previously disclosed in our Annual Report on Form 10-K for the year ended December 31, 2014.

## Market risk

As filed, 938 characters.

**Metal Price –** Changes in the market price of gold may significantly affect our profitability and cash flow. Gold prices fluctuate widely due to factors such as; demand, global mine production levels, investor sentiment, central bank reserves, and the value of the U.S. dollar.

In the first quarter of 2015, Gold Bullion prices averaged approximately $1,219.22 per ounce, up from a quarterly low close of $1,147.25 on March 18, 2015. Gold has fluctuated from that low to a high of $1,295.75 during the quarter. Silver prices averaged $16.72 per ounce, also gaining from quarterly lows of $15.47 on March 18, 2015 to a high of over $18.23 per ounce during the first quarter. The outlook for these markets remains mixed, driven primarily by uncertainty over U.S. fiscal and monetary policy.

With the exception of the above, there have been no material changes in the market risks discussed in Item 7A of our Annual Report on Form 10-K.

## Controls and procedures

As filed, 2,565 characters.

### A. Disclosure

### Evaluation of Disclosure Controls and Procedures

As of the end of the period covered by this Quarterly Report on Form 10-Q, management performed, with the participation of our Principal Executive Officer and our Principal Financial Officer, an evaluation of the effectiveness of our disclosure controls and procedures as defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934 (“Exchange Act”). Our disclosure controls and procedures are designed to ensure that information required to be disclosed in the reports we file or submit under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in the Exchange Act and SEC’s rules, and that such information is accumulated and communicated to our management, including our Principal Executive Officer and Principal Financial Officer, to allow timely decisions regarding required disclosures. There are inherent limitations to the effectiveness of any system of disclosure controls and procedures, including the possibility of human error and the circumvention or overriding of the controls and procedures. Accordingly, even effective disclosure controls and procedures can only provide reasonable assurance of achieving their control objectives. Each of our Principal Executive Officer and Principal Financial Officer concluded that, as of March 31, 2015, our disclosure controls and procedures were effective.

#### Design and Evaluation of Internal Control over Financial Reporting

Our management is responsible for establishing and maintaining adequate internal control over financial reporting as defined in Exchange Act Rule 13a-15(f) and 15d-15(f). Our management assessed the effectiveness of our internal control over financial reporting as of March 31, 2015. In making this assessment, management used the criteria for effective internal control over financial reporting described in the “Internal Control-Integrated Framework” (2013) set forth by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Based on the assessment, management concluded that, as of March 31, 2015, our internal control over financial reporting was effective based on those criteria.

### B. Internal Control over Financial Reporting

No change in our internal control over financial reporting, as such term is defined in Exchange Act Rule 13(a)-15 occurred during the fiscal quarter ended March 31, 2015, that materially affected or is reasonably likely to materially affect our internal control over financial reporting.

## Risk factors

As filed, 153 characters.

There have not been any material changes to the risk factors previously disclosed in our Annual Report on Form 10-K for the year ended December 31, 2014.

Filed Apr 16, 2015.
Source: SEC EDGAR, the filing index for accession 0001120970-15-000013. Last ingested by Listed: Nov 4, 2026, 17:20 ET. No prices; not investment advice.