# Comstock Inc.: Form 10-Q for the period ended Sep 30, 2015

- Company: [Comstock Inc.](/companies/lode.md) (CIK 1120970)
- Form: 10-Q
- Filed: 2015-10-23
- Accepted by EDGAR: Oct 23, 2015, 17:07 ET
- Period: 2015-09-30
- Accession: 0001120970-15-000048
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1120970/000112097015000048/lode-2015930x10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1120970/000112097015000048/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2015-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2015-07-01 to 2015-09-30 | $4.3m | us-gaap:Revenues |
| Revenue | 9 months, 2015-01-01 to 2015-09-30 | $15.9m | us-gaap:Revenues |
| Operating income | 3 months, 2015-07-01 to 2015-09-30 | −$4.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2015-01-01 to 2015-09-30 | −$6.8m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2015-07-01 to 2015-09-30 | $337.7k | us-gaap:InterestExpense |
| Interest expense | 9 months, 2015-01-01 to 2015-09-30 | $891.8k | us-gaap:InterestExpense |
| Income tax | 3 months, 2015-07-01 to 2015-09-30 | $0 | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2015-01-01 to 2015-09-30 | $0 | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2015-07-01 to 2015-09-30 | −$4.3m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2015-01-01 to 2015-09-30 | −$4.5m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2015-07-01 to 2015-09-30 | −$0.07 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2015-01-01 to 2015-09-30 | −$0.11 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2015-07-01 to 2015-09-30 | −$0.07 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2015-01-01 to 2015-09-30 | −$0.11 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2015-07-01 to 2015-09-30 | 112,133,768 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2015-01-01 to 2015-09-30 | 94,036,959 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2015-01-01 to 2015-09-30 | $428.8k | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2015-07-01 to 2015-09-30 | $3.9m | us-gaap:PaymentsToAcquireProductiveAssets |
| Capital expenditure | 9 months, 2015-01-01 to 2015-09-30 | $4.9m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2015-09-30 | $2.5m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2015-09-30 | $5.1m | us-gaap:AssetsCurrent |
| Total assets | at 2015-09-30 | $45.1m | us-gaap:Assets |
| Current liabilities | at 2015-09-30 | $12.8m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2015-09-30 | $26.3m | us-gaap:Liabilities |
| Shareholders' equity | at 2015-09-30 | $18.8m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 58,409 characters.

The following discussion provides information that we believe is relevant to an assessment and understanding of the consolidated results of operations and financial condition of the Company as of and for the three and nine month periods ended September 30, 2015, as well as our future results. It should be read in conjunction with the condensed consolidated financial statements and accompanying notes also included in this Form 10-Q and our Annual Report on Form 10-K as of, and for the fiscal year ended December 31, 2014.

### Overview

The Company is a producing, Nevada-based, gold and silver mining company with extensive, contiguous property in the historic Comstock and Silver City mining districts (collectively, the “Comstock District”) and is an emerging leader in sustainable, responsible mining, including concurrent and accelerated reclamations, soil sampling, voluntary air monitoring, cultural asset protection and historical restorations. The Company began acquiring properties in the Comstock District in 2003. Since then, the Company has consolidated a significant portion of the Comstock District, re-zoned its properties consistent with mining uses, built an infrastructure, and brought an exploration project into production. The Company continues acquiring additional properties in the district, expanding its footprint and creating opportunities for further exploration, development and mining. The near term goal of our business plan is to deliver stockholder value by validating qualified reserves (proven and probable) from our first two resource areas, Lucerne and Dayton, and significantly grow the commercial development of our operations through extended, long-lived mine plans that are economically feasible and socially responsible.

The Comstock District is located within the western portion of the Basin and Range Province of Nevada, between Reno and Carson City. Because of the Comstock District’s historical significance, the geology is well known and has been extensively studied by the Company, our advisors and many independent researchers. We have expanded our understanding of the geology of the project area through vigorous surface mapping, geophysical analysis, exploration drilling, drill hole logging and extensive mine development and planning, including geological level plans and cross-sectional analysis. The volume of geologic data is immense, and thus far the reliability has been excellent, particularly in the various Lucerne Mine areas. We have amassed a large library of historic data and detailed surface mapping of Comstock District properties and continue to obtain historic information from private and public sources. We use such data in conjunction with information obtained from our current mining operations, to target geologically prospective exploration areas and plan exploratory programs, including expanded surface and underground drilling.

Our Lucerne Resource area is located in Storey County, Nevada, approximately three miles south of Virginia City and 30 miles southeast of Reno. Our Dayton Resource area is located in Lyon County, Nevada, approximately six miles south of Virginia City. Access to the properties is by State Route 342, a paved route.

The Company achieved initial production and held its first pour of gold and silver on September 29, 2012. The Company produced approximately 20,815 and 22,925 gold equivalent ounces in 2013 and 2014, respectively. That is, the Company produced 17,739 ounces of gold and 186,482 ounces of silver in 2013, and 19,601 ounces of gold and 222,416 ounces of silver in 2014. During the first nine months of 2015, the Company poured 13,117 ounces of gold and 179,074 ounces of silver. The Company reduced its strip ratio from a 2014 average of 4.83 to less than 1.0. Grade remained strong at 0.031 ounces of gold per ton and 0.663 ounces of silver per ton or higher, continuing the grade improvement trend started in 2014. The recovery rate for gold has sustained at 81%.

We continue expanding our property footprint and creating opportunities for exploration and mining. The Company now owns or controls approximately 8,546 acres of mining claims and parcels in the Comstock and Silver City Districts. The acreage is comprised of approximately 2,245 acres of patented claims (private lands) and surface parcels (private lands) and approximately 6,301 acres of unpatented mining claims, which the Bureau of Land Management (“BLM”) administers.

### Current Projects

The Company’s headquarters, mine operations and heap leach processing facility are in Storey County, Nevada, at 1200 American Flat Road, approximately three miles south of Virginia City, Nevada and 30 miles southeast of Reno, Nevada. The Company has focused development to date on the Lucerne Resource Area (including both surface and underground east-side targets), the Dayton Resource Area and the Spring Valley exploration target. We also plan on focusing longer term, future explorations on the Northern Extension, Northern Targets, and Occidental Target Areas subsequent to the exploration and development of Lucerne, Dayton and Spring Valley. Production has been ongoing in the Lucerne Mine since 2012, and this year, the Company is nearing completion of the first phase surface mining activities, the SR 342 road realignment and the final extraction of existing mine dumps. On September 5, 2015, the Company also began construction of an underground exploration portal and drift at the north end of the floor in the existing Lucerne Surface Mine. On September 24, 2015 the Company announced that the drift had reached a linear distance of approximately 200 feet and that the first drill platform had been constructed and the underground drilling of the previously discovered, dike-like masses of quartz porphyry (PQ), had commenced. As of October 20, 2015, the drift had reached a linear distance of approximately 450 feet.

#### SR-342 Realignment and Extraction of Existing Mine Dumps

In early February, the Nevada Department of Transportation, (NDOT), closed an approximate two-mile section of SR-342, south of Gold Hill, as a safety precaution following roadway cracking and area specific sinking during a weekend of heavy rains. The area of sinking is above a historic mine-shaft dating back to the early 1900's, and that portion of the road sits on old mine dumps and looser fill that has a history of instability and, in some cases, failure. The Company owns the land, with NDOT granted prescriptive rights to operate the state roadbed over that private land. Storey County, NDOT, the Company, and other applicable regulatory agencies evaluated several remedies for the realignment of SR-342. The route is being realigned to the east of the historic shaft, enabling safe travel and continued mining, while positioning the area for future mining and development.

In addition, during the latter part of 2014, the geological and environmental teams undertook a systematic evaluation of historic mine dumps throughout most of the central part of the District. Quantifying and understanding the nature of possible legacy contaminants and identifying the extent of mineralization with the potential to increase mineable resources were the two primary objectives. Overall, we identified approximately 640,000 tons of mineralized dump materials. Of that total, approximately 450,000 tons were located underneath and to the east of State Route 342, with an average grade between 0.025-0.035 opt Au. These tons are being extracted as part of the SR-342 re-alignment, and stacked onto the leach pad for processing providing a significant environmental remediation and a meaningful contribution to operations and production schedule.

The realignment occurs over two major phases. Phase 1 of the project was completed about one week ahead of the original schedule. The project effectively and safely realigns a portion of the state route away from the items that caused the instability in that portion of the road, namely the early 1900’s historic Silver Hill Shaft and the loose dump fill that was extracted. The historic shaft was also permanently capped.

Phase 2 includes removal of additional loose dump fill and related material on the east side of the canyon and will conclude with a tie in of the south end of the newly constructed (Phase 1) alignment. A final, approximately seven-week closure commenced on September 29, 2015. This was required for the final tie in and completion of the realignment. The latter part of Phase 2 also includes plans for a restoration and stabilized storm water flow, post construction. This consists of excavating historic waste rock and contaminated material from a section of Gold Canyon Creek. The excavated portion of Gold Canyon Creek will be realigned and restored to allow for stabilized storm water flow and allow for areas of re-vegetation and site enhancement. The Company received authorization under Nationwide Permit Number 27 on July 10, 2015, and is proceeding with these activities. Other applicable (from the State of Nevada) permits; including a "401 Water Quality Certification" and a "Temporary Permit for Working in Waterways" were obtained in the first quarter of 2015. The project is scheduled for early completion in November 2015, with an estimated remaining cost of approximately $1 million.

Upon completion of the bypass, NDOT’s prescriptive rights to operate the road will be transferred from the existing closed section of State Route 342 to the new roadway alignment.

#### Dayton Drill Program

Surface drilling on the Company’s Dayton property, located in the southern part of the Comstock district, commenced in the first quarter of 2015 The program consisted of 408 holes totaling 30,818 feet of drilling that was completed in late September of 2015. See Dayton Property: Figure 1 below. The Company used an extremely efficient percussion drill rig, with total program costs of about $200,000, or about $6.50 per foot.

The Company also completed underground mapping and sampling from a number of historic mine tunnels. This work, together with the drilling, resulted in several important discoveries, including defining multiple, previously undefined mineralized zones and additional dike-like masses of quartz porphyry, similar to Lucerne.

The main objective of the program was to pinpoint the major surface structures (faults) and then explore these structures for mineralization. This then enabled efficient infill drilling that further refined and resolved areas of structural complexity in the geologic models. The program was successful in both defining and expanding the near-surface mineralization. The Company will update its geologic model based on the results of this drilling program and increase the gold and silver resource estimate. The Company is now finalizing a comprehensive drill program designed to deliver a mine plan, economic reserves and mine life.

Of the 408 holes drilled, 245 contained intercepts of 10 feet or more in length with gold grades exceeding or equal to 0.015 ounces per ton (opt.), and with an overall weighted average grade of 0.035 opt Au and 0.323 opt Ag. Out of those same 245 holes, a total of 32 contained intercepts of 10 feet or more in length with an average Au grade exceeding or equal to 0.100 opt Au., and with an overall average weighted grade of 0.148 opt Au and 0.694 opt Ag (Table 1).

TABLE 1 - Drill hole intercepts of 10 feet or greater in length with gold (Au) grades equal to or exceeding 0.100 opt.:

| Hole ID | Interval Depth | Intercept Length | Au grade (opt). | Ag grade (opt.) |
| --- | --- | --- | ---: | ---: |
| DA-037 | 20-30’ | 10 feet | 0.183 | 0.533 |
| DA-099 | 60-70’ | 10 feet | 0.129 | 0.566 |
| DA-100 | 60-70’ | 10 feet | 0.237 | 0.790 |
| DA-117 | 20-30’ | 10 feet | 0.100 | 0.557 |
| DA-119 | 10-30’ | 20 feet | 0.139 | 0.626 |
| DA-127 | 10-20’ | 10 feet | 0.112 | 1.898 |
| DA-188 | 70-82’ | 12 feet | 0.128 | 0.186 |
| DA-193 | 60-70’ | 10 feet | 0.164 | 0.700 |
| DA-197 | 10-20’ | 10 feet | 0.180 | 1.090 |
| DA-199 | 40-54’ | 14 feet | 0.113 | 1.063 |
| DA-200 | 70-82’ | 12 feet | 0.252 | 1.266 |
| DA-208 | 0-10’ | 10 feet | 0.143 | 0.899 |
| DA-209 | 30-36’ | 6 feet | 0.114 | 1.550 |
| DA-212 | 10-20’ | 10 feet | 0.167 | 0.279 |
| DA-215 | 0-10’ | 10 feet | 0.105 | 0.909 |
| DA-228 | 50-60’ | 10 feet | 0.219 | 0.485 |
| DA-237 | 10-20’ | 10 feet | 0.131 | 1.440 |
| DA-260 | 30-35’ | 5 feet | 0.256 | 1.274 |
| DA-273 | 50-60’ | 10 feet | 0.161 | 0.071 |
| DA-279 | 0-10’ | 10 feet | 0.143 | 0.538 |
| DA-289 | 10-20’ | 10 feet | 0.142 | 0.148 |
| DA-290 | 20-30’ | 10 feet | 0.100 | 0.246 |
| DA-294 | 50-60’ | 10 feet | 0.122 | 0.397 |
| DA-295 | 10-20’ | 10 feet | 0.107 | 0.603 |
| DA-316 | 30-40’ | 10 feet | 0.184 | 0.238 |
| DA-318 | 0-10’ | 10 feet | 0.123 | 0.232 |
| DA-333 | 50-60’ | 10 feet | 0.292 | 0.731 |
| DA-344 | 0-10’ | 10 feet | 0.161 | 2.155 |
| DA-367 | 70-82’ | 12 feet | 0.266 | 0.437 |
| DA-369 | 10-20’ | 10 feet | 0.115 | 0.116 |
| DA-395 | 40-60’ | 20 feet | 0.160 | 0.678 |
| DA-397 | 40-50’ | 10 feet | 0.108 | 1.158 |
| DA-403 | 20-30’ | 10 feet | 0.100 | 1.050 |
| DA-404 | 60-70’ | 10 feet | 0.108 | 1.103 |

22

The underground mapping and sampling effort, together with the drilling, resulted in several important discoveries. The most significant was defining mineralization along a previously undrilled, 600-foot segment of the Grizzly Hill Fault and additional mineralization at an intersection of the Grizzly Hill and Alhambra Faults with the Silver City fault. The Company also discovered additional dike-like masses of quartz porphyry, similar to Lucerne, that generally host significant mineralization. Finally, the drilling also helped to define extended mineralization along a 550-foot segment of the Mill Fault.

The Company also commenced metallurgical test-work on representative samples of mineralized rock types. The Company also commenced standard column tests on five surface-generated samples and one underground sample. These tests are ongoing. All samples, both from drilling and underground, were analyzed for gold and silver at the Company’s existing, on-site, industry standard, production assay lab.

The Dayton property includes the Dayton (Marble), Alhambra, Kossuth, Metropolitan and Gennessee patents representing a structurally controlled mineralized system hosted in tertiary volcanic rocks that, in terms of the overall geologic setting, is similar to the Company's Lucerne property. The properties are separated by approximately one mile along the Silver City branch of the Comstock Lode.

#### Lucerne Exploration and Underground Development

The Company completed extensive geological development and modeling, utilizing its previously collected drill hole data, historic underground mine maps and current mining data, among other geological information. This resulted in highly detailed geologic level plans and cross sectional analysis for the Lucerne East-side. The sectional compilation resulted in several important findings. The work confirmed that the lode is comprised of a group of northwest trending, sub-parallel, higher-grade, mineralized structures, rather than a simple vein system confined to a single fault zone. These structural groups coalesce into a single zone in the central part of the East-side area and diverge to the north and south to create zones up to 600-feet wide. The Company also discovered dike-like masses of quartz porphyry (PQ) that have intruded into the main lode and have a direct relationship to the known mineralization.

The first phase of the tunnel development, with a planned investment of $3 million, is expected to be approximately 800 feet, running parallel to the PQ target. This phase includes approximately 20,000 feet of diamond-core definition drilling and is scheduled for completion before year-end. Previously disclosed drill data from the PQ includes 46 intercepts of at least 10 feet that grade, on average, over 0.23 ounces of gold per ton and over 1.71 ounces of silver per ton. The construction of the underground exploration portal (“Harris Portal”) and development of the exploration drift (“tunnel”) in the existing Lucerne Surface Mine commenced on September 5, 2015 and is progressing on schedule, reaching a linear distance of approximately 300 feet at September 30, 2015. On September 24, 2015, construction of the first drill platform was completed and the underground drilling of the previously discovered, dike-like masses of quartz porphyry (PQ), commenced.

Out of this extensive geologic work, a definitive underground development target has emerged, specifically that part of the lode occupied by the mineralized mass of PQ, as well as the neighboring wall rocks. This conclusion is based on surface drill hole results, metallurgy, and proximity to the current Lucerne Mine floor, as well as past mining data.

In addition to the mineralized mass of PQ, we developed and defined the nearby Woodville Bonanza structures with the same diligent level plan and cross sectional development. These geologic definitions include the same detail and historical mappings plus over 116 intercepts of at least 10 feet grading over 0.22 ounces per ton gold and 1.59 ounces of silver per ton.

The PQ and Woodville structures represent the most significant opportunity for immediately exploring and progressing the development of an accelerated underground mine plan in the Lucerne Area.

The Company partnered with American Mine and Tunneling LLC, and American Drilling Corp, LLC

, based on their superior expertise and quality services to the mining industry, ranging from beginning stage drilling and exploration to initial drift and tunneling, to commence developing a new underground access to the PQ structures and the almost adjacent Woodville Bonanza structures.

#### Permitting for Expansions

On July 8, 2015 Storey County Board of Commissioners confirmed that the major modifications to the Company’s operating plan conform to the conditions of the existing Special Use Permit No. 2000-222-A-5 (‘SUP’) and unanimously approved that plan. The modified operating plan outlines the Company’s plan to develop a portal and underground tunnel (a “drift”) alongside a highly mineralized series of high-grade structures. The Company then plans to efficiently drill and develop those structures into an expanded resource and, based upon the final economic feasibility analysis, expanded mine plans. The existing permit allows the Company to begin construction activities of an underground mine portal for exploration and development of known Lucerne resources, ultimately with the objective of establishing gold and silver reserves. The Company plans to invest approximately $3 million for the first phase, including the underground portal, primarily core drilling and certain related infrastructure for the Lucerne underground exploration and development project.

The Company filed a Pre-Construction Notification application with the U.S. Army Corps of Engineers for the Gold Canyon Creek Restoration Project. The project consists of excavating historic waste rock and contaminated material from a section of Gold Canyon Creek. The excavated portion of Gold Canyon Creek will be realigned and restored to allow for stabilized storm water flow and allow for areas of re-vegetation and site enhancement. The Company received authorization under Nationwide Permit Number 27 on July 10, 2015, enabling the ongoing realignment and remediation of SR-342.

On August 25, 2015, the Company announced that the Nevada Division of Environmental Protection Bureau of Mining Regulation and Reclamation (NDEP-BMRR) issued a Notice of Decision (NOD) approving an Engineering Design Change to the Company's Water Pollution Control Plan for Underground Exploration. NDEP-BMRR also approved a major modification to the Company's Reclamation Permit and Surety Decision for the proposed Underground Development of the Lucerne Mine. These modified permits allow the construction of an underground exploration portal and drift at the north end of the floor in the existing Lucerne Surface Mine. The exploration project is situated on previously-disturbed private land.

The Company also filed a modified water pollution control permit for the expansion of an additional heap leach pad cell (Cell 10), with approval anticipated in the fourth quarter of 2015.

#### Production

During 2014, the Company completed its second full year of production and transitioned from the Billie the Kid and Hartford patented claims in the Lucerne West-side Mine to the higher-grade Justice and Lucerne patents, also in the Lucerne West-side Mine. The Company completed the planned mining for the Billie the Kid, Hartford and Justice patents during 2014, while continuing to mine the Lucerne patent through 2014 and 2015. During the second and third quarters of 2015, the Company further expanded its activities to include a more significant amount of extraction from the historic mine dumps adjacent to and underneath the existing portion of SR-342, into the daily production schedule. Substantially all of the operations for the second half of 2015 are focused on surface activity, including the extraction of the mineralized material contained in those remaining mine dumps while also completing the realignment of SR-342, establishing a drift into the higher-grade PQ and Woodville targets, and developing those targets towards the establishment of reserves for potential future mining.

The Company operates a heap leach based, gold and silver production system, including a zinc-precipitate based Merrill-Crowe processing plant. The Company, under the existing water pollution control permit with the State of Nevada, has the crushing and processing capacity to operate at a rate of up to 4.0 million tons of material crushed and stacked, per annum. The Merrill-Crowe system facilitates that capacity with an operating fluid processing rate of over 1,000 gallons per minute. In March 2015, the Company completed construction of a ninth heap leach pad cell. The Company's nine cells continue under solution until the target gold and silver recovery rates have been achieved.

The following table presents mining operations and production for the each of the first three quarters of 2015 and 2014 and for the nine month period ended September 30, 2015 and 2014:

| Mining Operations | 3Q 2015 | 2Q 2015 | 1Q 2015 | YTD 2015 | 3Q 2014 | 2Q 2014 | 1Q 2014 | YTD 2014 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Tons Mined | 140,415 | 254,856 | 316,199 | 711,470 | 1,131,985 | 944,166 | 947,852 | 3,024,003 |
| **Processing** |  |  |  |  |  |  |  |  |
| Tons Crushed | 104,286 | 211,942 | 157,612 | 473,840 | 191,013 | 122,026 | 205,686 | 518,725 |
| Weighted Average Grade Per Ton Au | 0.021 | 0.030 | 0.039 | 0.031 | 0.026 | 0.034 | 0.024 | 0.027 |
| Weighted Average Grade Per Ton Ag | 0.573 | 0.654 | 0.734 | 0.663 | 0.564 | 0.546 | 0.345 | 0.473 |
| Estimated Au Ounces Stacked | 2,240 | 6,438 | 6,083 | 14,761 | 4,926 | 4,191 | 5,016 | 14,133 |
| Estimated Ag Ounces Stacked | 59,717 | 138,639 | 115,689 | 314,045 | 107,822 | 66,607 | 70,989 | 245,418 |
| Estimated Au Equivalent\* Ounces Stacked | 3,034 | 8,344 | 7,669 | 19,047 | 6,584 | 5,205 | 6,140 | 17,929 |
| Au Ounces Poured and Sold | 3,847 | 4,575 | 4,695 | 13,117 | 5,002 | 4,763 | 4,507 | 14,272 |
| Ag Ounces Poured and Sold | 62,480 | 60,112 | 56,482 | 179,074 | 61,096 | 48,626 | 49,358 | 159,080 |
| Au Equivalent\* Ounces Poured | 4,678 | 5,400 | 5,470 | 15,548 | 5,936 | 5,499 | 5,290 | 16,725 |
| \* Au Equivalent ounces = Au ounces (actual) + (Ag ounces (actual) ÷ the ratio of average gold to silver prices) | 75.27 | 72.73 | 72.91 | 73.63 | 65.03 | 65.69 | 63.14 | 64.62 |

The following table presents weighted average grades of gold and silver by quarter:

|  | Weighted Average per ton Gold | Weighted Average per ton Silver |
| --- | ---: | ---: |
| Q1, 2014 | 0.024 | 0.345 |
| Q2, 2014 | 0.034 | 0.546 |
| Q3, 2014 | 0.026 | 0.564 |
| Q4, 2014 | 0.039 | 0.680 |
| **2014 YTD** | **0.030** | **0.527** |
| Q1, 2015 | 0.039 | 0.734 |
| Q2, 2015 | 0.030 | 0.654 |
| Q3, 2015 | 0.021 | 0.573 |
| **2015 YTD** | **0.031** | **0.663** |

During the third quarter of 2015, the Company poured 3,847 ounces of gold and 62,480 ounces of silver. The Company mined approximately 140,000 tons of material (mineralized material and waste). Total mineralized material delivered to the leach pad was 104,000 tons.

Gold and silver grades improved as compared to 2014, and the weighted average for the nine months ended September 30, 2015, was 0.031 ounces per ton gold and 0.663 ounces per ton silver as compared to a weighted average for the nine months ended September 30, 2014, of 0.027 ounces per ton of gold and 0.473 ounces per ton of silver, representing a 15% and 40% increase, respectively.

Throughout the first nine months of 2015, the Company realized an average price of $1,212.03 price per ounce of gold and a $15.96 average sales price per ounce of silver. In comparison, commodity market prices in the first nine months of 2015 averaged $1,178.69 per ounce of gold and $16.02 per ounce of silver.

Our Comstock exploration activities include open pit gold and silver test mining. As defined by the Securities Exchange Commission (“SEC”) Industry Guide 7, we have not yet established any proven or probable reserves at our Comstock Lode Project.

### Operating Costs

During the first nine months of 2015, actual costs applicable to mining revenue were approximately $13.2 million, $10.4 million net of silver credits as compared to $17.8 million, $14.6 million net of silver credits during the first nine months of 2014, representing a 25% reduction of net costs applicable to mining revenue. Costs applicable to mining revenue include mining and processing labor, maintenance, drilling and blasting and assaying costs, among others. Costs applicable to mining revenue for the first nine months of 2015 and 2014 also include depreciation of $4.6 million and $3.9 million, respectively.

During the first nine months of 2015, the Company continued reducing costs applicable to mining revenue, targeting $7 million in reductions this year as compared to 2014. The Company has already realized $4.2 million of savings from reduced labor, drilling, and blasting and fuel and $0.9 million of cost reductions in non-mining activities in the first nine months of 2015, as compared to the same period in 2014. The Company has also identified $3.0 million of potential cost reductions in all other non-mining activities, including general, administrative, and environmental areas. The Company incurred approximately $0.7 million in severance costs during the first nine months of 2015, in mining and general and administrative expenses, associated with organizational cost reductions. The Company is on track to achieve or exceed its stated costs savings target.

### Outlook

The Company has been cash flow positive from operations for the first nine months of 2015, and expects to generate cash from mining operations in the fourth quarter, notwithstanding weaker revenues in fourth quarter as the Company transitions from the final phase of surface mining in Lucerne to the expansion into an underground portal and drift development in Lucerne. The Company is concurrently completing the road realignment during fourth quarter.

The Company commenced the underground drift-mining and drilling, associated with the first underground exploration phase of a quartz porphyry geological target (“PQ target”), in September 2015, and expects to complete drift-sampling, drilling and ongoing metallurgical test work of the PQ target by December 2015. The second major phase of drift-mining and drilling, currently planned for the Woodville target, is expected to be completed by April 2016.

The Company's goals for this year included minimizing operating and capital costs, including the elimination of legacy royalties and dividends, restructuring and simplifying our capital structure, eliminating and reducing certain liabilities, completing the SR-342 realignment project, currently scheduled for completion in November 2015, expanding the Lucerne exploration and development activities, primarily through the underground portal and drift development and commencing the final development phase of the Dayton Resource Area.

During the first nine months of 2015, the Company continued reducing costs applicable to mining revenue and increased its expectation of savings from costs applicable to mining to $7 million (from a previous target of $5 million), when comparing 2015 to 2014. The Company has also doubled its expectation of savings from all other non-mining activities, including general, administrative, hospitality, mine claims and costs and environmental and other areas, to $3 million (from a previous target of $1.5 million), when comparing 2015 to 2014. These increases raise our total costs savings targets to $10 million, from $6.5 million, when comparing 2015 to 2014. In both categories, the Company is on track to achieve or exceed its stated costs savings target.

#### Recent Developments

On October 19 2015, the Company issued 10,169,492 shares of common stock to investors at a price per share of $0.59. As a result of the offering, the Company received net cash proceeds of approximately $5.9 million.

As announced on August 27, 2015, the Company successfully completed a restructuring of certain components of its capital structure, primarily associated with all series of its issued and outstanding Convertible Preferred Stock and certain obligations associated with the Northern Comstock joint venture associated with some its most important land holdings. The Company successfully converted all of its preferred stock to common stock, eliminating the preferred stock, eliminating the special rights of the preferred stock holders, including extra voting rights, and eliminating future dividends associated with those instruments. The Company also materially reduced future capital and royalty obligations associated with some of its highest prospective mineralized land claims contained in the Northern Comstock joint venture.

In addition, on August 27, 2015, the Company announced that it entered into the first amendment of its operating agreement (the "First Amendment") with the other members of its Northern Comstock LLC joint venture. The First Amendment permanently reduced capital contribution obligations of the Company from $31.05 million down to $9.75 million (now payable at $812,500 per year for twelve years) and permitted such capital contributions, to be made in the form of cash, or in certain circumstances at the Company’s option, with the Company’s common stock. The First Amendment also provides for a one-time acceleration of $1,625,000 of the capital contributions payable when the cash and cash equivalents of the Company exceed $12,500,000 and an addition provision for accelerating scheduled payments, but not ever increasing the overall payments, based on a percentage (that is, 3%) of active production revenue generated by the properties subject to the Northern Comstock LLC joint venture. On September 28, 2015, the Company entered into the second amendment of its operating agreement (the "Second Amendment") with the other members of its Northern Comstock LLC joint venture. Pursuant to the Second Amendment, the Company's annual contributions of $812,500 per year were divided into eleven monthly cash capital contributions of $30,000 with a single annual capital contribution of $482,500 payable in cash unless the Company has cash and cash equivalents of less than $10,500,000 on the date of such payments, wherein the Company then has the option to pay that annual contribution in common stock or cash, at its option. The Second Amendment also provides for a one-time acceleration of $812,500 of the capital contributions payable when the Company receives net cash proceeds from sources other than operations that exceed $6,250,000. The agreement also includes an ongoing acceleration of the Company's capital contribution obligations equal to 3% of the net smelter returns generated by the properties subject to the Northern Comstock LLC joint venture. The Second Amendment also provides that if the Company defaults in its obligation to make the scheduled capital contributions, then the remaining capital contribution obligations may be converted into the principal amount of a 6% per annum promissory note payable by the Company on the same schedule as the capital contributions, secured by a mortgage on the properties subject to the Northern Comstock LLC joint venture.

On September 28, 2015, the Company announced that the Board of Directors of the Company received and accepted the resignation of John V. Winfield as Chairman of the Board. Upon receipt of such resignation, the Board appointed Corrado De Gasperis as Executive Chairman of the Board and Robert C. Kopple as Lead Independent Director and Vice Chairman of the Board.

### Land and Mineral Right Purchases

The Company continues to increase its footprint in the Comstock District through strategic acquisitions. The Company considers the historic Comstock District central to its growth strategy.

During the first nine months of 2015, the Company completed various purchases of land and buildings totaling over 897 acres of land in Gold Hill, Nevada, including properties adjacent to the mining and processing operation, with purchase prices totaling approximately $5.6 million, including the issuance of 1,553,462 restricted shares of common stock as part of the purchase of two of the properties.

### Comparative Financial Information

The Company had two operating segments as of September 30, 2015, mining, and hospitality and lease. As we continue to focus on the increased productivity of our mining operations, our hospitality and lease segment has become insignificant to our consolidated financial position, results of operation, and cash flows for the three and nine months ended September 30, 2015.

The comparative financial information is reflected in the following table:

#### Three Months Ended:

|  | September 30, 2015 | September 30, 2014 | Change |
| --- | ---: | ---: | ---: |
| Revenue - Mining | $4,301,169 | $6,513,348 | $(2,212,179) |
| Revenue - Hospitality and lease | 43,904 | 274,201 | (230,297) |
| Costs applicable to mining revenue | 3,450,311 | 4,377,791 | (927,480) |
| Hospitality and lease operating costs | 42,549 | 331,613 | (289,064) |
| Exploration and mine development | 1,505,492 | 767,552 | 737,940 |
| Mine claims and costs | 691,444 | 1,064,519 | (373,075) |
| Environmental and reclamation | 169,148 | 167,194 | 1,954 |
| Land and Road Development | 818,474 | — | 818,474 |
| General and administrative | 1,637,313 | 1,509,494 | 127,819 |
| Loss from operations | (3,969,658) | (1,430,614) | (2,539,044) |
| OTHER INCOME (EXPENSE) |  |  |  |
| Change in fair value of derivatives | — | (366,011) | 366,011 |
| Interest expense | (337,700) | (264,323) | (73,377) |
| Interest and other income | — | 1,012,190 | (1,012,190) |
| NET INCOME (LOSS) | $(4,307,358) | $(1,048,758) | $(3,258,600) |

Mining revenue in the three months ended September 30, 2015 was $4.3 million. The decrease of $2.2 million, or 34%, resulted from lower production and lower average price per ounce of gold realized of $1,116.44 versus $1,262.91 for the three months ended September 30, 2015 and 2014, respectively. The Company produced 3,847 ounces of gold (and 62,480 ounces of silver), during the three-month period of 2015, as compared to 5,002 ounces of gold (and 61,096 ounces of silver) in the three-month period of 2014. The Company crushed and stacked 104,286 dry tons of mineralized material, delivering 2,240 estimated ounces of recoverable gold (and 59,717 estimated ounces of recoverable silver) to the leach pads with weighted average gold grades of 0.021 ounces per ton (and silver grades of 0.573 ounces per ton).

Throughout the three months ended September 30, 2015, the Company realized an average price of $1,116.44 per ounce of gold and a $14.83 average sales price per ounce of silver. In comparison, commodity market prices in the third quarter of 2015 averaged $1,124.01 per ounce of gold and $14.93 per ounce of silver.

Hospitality and lease revenue decreased $0.2 million in the third quarter of 2015, as compared to third quarter of 2014. Hospitality and lease operating costs decrease $0.3 million in the third quarter of 2015, as compared to third quarter of 2014. Effective April 1, 2015, the Company entered into an agreement to lease the Gold Hill Hotel to independent operators. The Company retains ownership to the land and Gold Hill Hotel properties while leasing the facilities and business to independent operators.

Costs applicable to mining revenue were $3.5 million for the three months September 30, 2015, including $0.9 million of silver credits, as compared to $4.4 million for the three months September 30, 2014, including $1.2 million of silver credits. The reduction of $0.9 million, or 21%, of net costs applicable to mining revenue resulted from lower fuel usage, lower equipment and drill and blast costs, enabled by improved grades, yields and a lower strip ratio, and the reduction of 14 mining and related staff.

Exploration and mine development costs increased by approximately $0.7 million during the three months ended September 30, 2015, as compared to the same period ended September 30, 2014. The increase is a result of approximately $0.5 million in exploration activities, including contract service fees associated with the commencement of the underground drift-mining and drilling for the first underground exploration phase of a quartz porphyry geological target (“PQ target”) and approximately $0.2 million for the completion of a near surface drilling program at the Dayton Resource Area.

Mine claims and costs decreased by $0.4 million during the three months ended September 30, 2015, as compared to the same period ended September 30, 2014. Mine claim costs consist of annual claim filing fees and annual payments related to the Northern Comstock joint venture. The operating agreement of Northern Comstock LLC was amended in the third quarter of 2015.

Land and road development costs were $0.8 million in the third quarter of 2015, due to a collaboration with Storey County, the Nevada Department of Transportation (NDOT) and other applicable regulatory agencies, to complete the first phase and commence the second phase of a project to realign SR-342. This project started in 2015.

Interest and other income and expense decreased approximately $1.0 million as a result of the lapse of tax indemnification in the third quarter of 2014. There was no similar income from the lapse of tax indemnification in 2015.

Change in fair value of derivatives decreased by $0.4 million in the nine months ended September 30, 2015, as compared to the same period ended September 30, 2014. This change is primarily the result of the elimination of a debt derivative obligation related to a prior provision in the agreement with The Golden Goose Mine for the purchase of the properties in the Dayton Resource Area.

Net loss was $4.3 million for the three months ended September 30, 2015, as compared to a net loss of $1.0 million for the three months ended September 30, 2014. The $3.3 million increase in net loss resulted from a $2.4 million decrease in revenue and a $0.7 million decrease in net other income and expense, plus an increase of costs of $1.5 million resulting from $0.8 million of expense for land and road development costs associated with the SR-342 realignment and $0.7 million increase in costs associated with the first underground exploration phase and the Dayton exploration and development costs, offset by cost reductions of $1.5 million resulting primarily from a $0.4 million reduction in mine claim and costs, $0.9 million in reductions from lower labor, drill and blast, equipment and fuel usage, driven by a lower strip ratio, and lower fuel prices and $0.2 million reduction in general administrative and hospitality expenses.

#### Nine Months Ended:

|  | September 30, 2015 | September 30, 2014 | Change |
| --- | ---: | ---: | ---: |
| Revenue - Mining | $15,670,371 | $18,098,395 | $(2,428,024) |
| Revenue - Hospitality and lease | 200,411 | 668,530 | (468,119) |
| Costs applicable to mining revenue | 10,388,054 | 14,607,454 | (4,219,400) |
| Hospitality and lease operating costs | 303,843 | 922,758 | (618,915) |
| Exploration and mine development | 2,639,346 | 2,262,329 | 377,017 |
| Mine claims and costs | 2,112,806 | 2,981,441 | (868,635) |
| Environmental and reclamation | 473,958 | 750,190 | (276,232) |
| Land and Road Development | 1,680,720 | — | 1,680,720 |
| General and administrative | 5,095,306 | 5,177,802 | (82,496) |
| Loss from operations | (6,823,251) | (7,935,049) | 1,111,798 |
| OTHER INCOME (EXPENSE) |  |  |  |
| Change in fair value of derivatives | — | (582,845) | 582,845 |
| Interest expense | (891,824) | (757,857) | (133,967) |
| Interest and other income | 3,187,385 | 1,013,426 | 2,173,959 |
| NET INCOME (LOSS) | $(4,527,690) | $(8,262,325) | $3,734,635 |

Mining revenue in the nine months ended September 30, 2015, was $15.7 million. The decrease of $2.4 million or 13%, resulted from lower production and lower average price per ounce of gold realized of $1,212.03 versus $1,267.47 for the nine months ended September 30, 2015 and 2014, respectively. The Company produced 13,117 ounces of gold (and 179,074 ounces of silver), during the nine-month period of 2015, as compared to 14,272 ounces of gold (and 159,080 ounces of silver) in the nine-month period of 2014. The Company crushed and stacked 473,840 dry tons of mineralized material, delivering 14,761 estimated ounces of recoverable gold (and 314,045 estimated ounces of recoverable silver) to the leach pads with weighted average gold grades of 0.031 ounces per ton.

For the nine-month period ended September 30, 2015, the Company realized an average sales price of $1,212.03 per ounce of gold and $15.96 per ounce of silver. In comparison, commodity market prices for the nine-month period ended September 30, 2015, averaged $1,178.69 per ounce of gold and $16.02 per ounce of silver.

Hospitality and lease revenue decreased $0.5 million in the nine months ended September 30, 2015, as compared to the same period in 2014. Hospitality and lease costs decreased $0.6 million in the nine months ended September 30, 2015, as compared to the same period in 2014. Effective April 1, 2015, the Company entered into an agreement to lease the Gold Hill Hotel. The Company retains ownership to the land and Gold Hill Hotel properties while leasing the facilities to independent operators.

During the nine months ended September 30, 2015, actual costs applicable to mining revenue were approximately $10.4 million, including $2.9 million of silver credits, as compared to $14.6 million, including $3.1 million of silver credits. The 29% reduction of net costs applicable to mining revenue is the result of lowered labor, equipment and drill and blast costs, primarily due to a lower strip ratio and lower fuel costs, from both lower consumption and lower fuel prices. The lower labor resulted from a reduction in the mine and support labor force by 43 employees during nine months ended September 30, 2015.

Exploration and mine development expenses increased by $0.4 million during the nine months ended September 30, 2015, as compared to the same period ended September 30, 2014. The increase in costs is a result of contract service fees to commence the underground drift-mining and drilling, associated with the first underground exploration phase of a quartz porphyry geological target (“PQ target”), offset by lower third party expenses associated with engineering services and mine planning.

Mine claims and costs decreased by $0.9 million during the nine months ended September 30, 2015, as compared to the same period ended September 30, 2014. Mine claim costs consist of annual claim filing fees and annual payments related to the Northern Comstock joint venture. The operating agreement of Northern Comstock LLC was amended in the third quarter.

Land and road development costs were $1.7 million in the nine months ended September 30, 2015, due to collaboration with Storey County, the Nevada Department of Transportation (NDOT) and other applicable regulatory agencies, to complete the first phase and commence the second phase of a project to realign SR-342. This project started in 2015.

Change in fair value of derivatives decreased by $582,845 in the nine months ended September 30, 2015, as compared to the same period ended September 30, 2014. This change is primarily the result of the release of debt derivative obligation related to a make whole provision in the agreement with The Golden Goose Mine for the purchase of the properties in the Dayton Resource Area.

Other income (expense) increased approximately $2.2 million in the nine months ended September 30, 2015, as compared to the same period ended September 30, 2014. On October 20, 2010, the Company exchanged all of its senior secured convertible and senior indebtedness owed to members of the Winfield Group, shareholders of the Company, for newly created Series A-1 preferred stock. As part of the exchange, the Company agreed to indemnify the Winfield Group for any amounts as part of the exchange that were determined to be taxable as ordinary income to each member of the Winfield Group. As a result of this transaction, the Company recorded an accrual loss contingency provision in 2010. In September 2014, a portion of the indemnity lapsed. In nine months ended September 30, 2015, the remaining portion of the indemnity has lapsed, and accordingly, the Company recognized a reduction in the loss contingency accrual of approximately $3.2 million, which is included in other income in the condensed consolidated statements of operations.

Net loss was $4.5 million for the nine months ended September 30, 2015, as compared to $8.3 million for the same period ended September 30, 2014. The improvement of $3.7 million primarily results from $5.1 million cost reductions associated with mining and all other non-mining costs and $3.2 million reduction in the loss contingency in the first nine months of 2015, as compared to the first nine months of 2014, primarily offset by an increase of $1.7 million of expense for land and road development costs associated with the SR-342 realignment and a $2.9 million decrease in revenue.

### Liquidity and Capital Resources

Total current assets were $5.1 million at September 30, 2015, including cash and cash equivalents of $2.5 million. Inventories, stockpiles, and mineralized material on leach pad totaled $1.0 million.

On March 6, 2015, the Company reached an agreement to draw on a restated $8 million revolving credit facility (the “Revolving Credit Facility”) with Auramet International, LLC (“Auramet”), pursuant to which the Company may borrow up to $8 million, subject to satisfying certain conditions and obtaining certain consents. The proceeds from the Revolving Credit Facility will primarily be used for an accelerated construction schedule for rerouting State Route 342, located in the Company’s Lucerne Resource Area, the first phase of which was completed in early June 2015, and the second phase before 2015 year end. On March 6, 2015, the Company drew $5 million representing cash proceeds of approximately $4.4 million, net of prepaid interest of approximately $0.4 million, and other fees of approximately $0.2 million. The Company and Auramet agreed to re-advance under the Revolving Credit Facility evidenced by the Note and extend up to $8 million of availability thereunder for the period from and after June 30, 2015 to April 29, 2016.

On May 12, 2015, the Company entered into a master lease agreement with Varilease Finance Inc. in which the Company obtained capital financing under a sale-leaseback transaction in the amount of $5 million. Due to certain types of continuing involvement, the Company was precluded from applying sale leaseback accounting and has accounted for the transaction under the financing method. The Company's obligations under the Varilease agreement are secured by an interest in the Company's mining equipment in exchange for 24 monthly payments of $228,820 totaling the cash proceeds of $5,000,000 and applicable interest.

Net cash generated by operating activities was $0.4 million for the nine months ended September 30, 2015, including a use of $1.7 million spent on the first and second phase of the SR-342 road realignment, as compared to a use of cash of $2.6 million for the nine months ended September 30, 2014. The Company's positive cash flow from operating activities in the first nine months of 2015, was primarily driven by reduced operating costs associated with lower labor, blasting, fuel and equipment rental and maintenance costs relative to production of mineralized material. The use of cash in the first nine months of 2014, was primarily from operating losses associated with higher mining costs relative to revenue due to a relatively higher ratio of waste to ore and pay down of $1.2 million of accounts payables balance.

Net cash used in investing activities was $4.8 million for the nine months ended September 30, 2015, primarily from $2.8 million for strategic land purchases and $1.9 million for the design and construction of the heap leach expansion and related infrastructure. Net cash used in investing activities for the nine months ended September 30, 2014, was $2.5 million, primarily as the result of $1.9 million purchase of land and mining vehicles, and bond increases of $0.8 million, offset by $0.2 million of proceeds from the sale of equipment previously used in our mining activities.

Net cash provided by financing activities for the nine months ended September 30, 2015, was $1.6 million, comprised of proceeds of $4.4 million from the Revolving Credit Facility and $5.0 million from the Varilease equipment lease agreement, offset by the pay-down of other long-term debt obligations of approximately $7.8 million. Net cash provided by financing activities for the nine months ended September 30, 2014 was $11.9 million, comprised of net proceeds of $11 million from sale of securities and proceeds of $4.6 million from the Revolving Credit Facility, partially offset by the pay-down of the Company's long-term debt obligations of approximately $3.7 million.

The Company was an exploration company for most of its existence and transitioned into production in the Lucerne Mine late in 2012, and accordingly, has incurred net operating losses since 2012. The Company generated cash from operations from the three quarters ended March 31, 2015, June 30, 2015, and September 30, 2015, after spending of $1.7 million for the SR-342 road realignment. During the first nine months of 2015, the Company continued reducing costs applicable to mining revenue, now targeting over $7 million in reductions this year as compared to 2014. The Company has already realized $4.2 million of savings from reduced labor, drilling, and blasting and fuel in the first nine months of 2015, as compared to the same period in 2014. The Company has also now identified $3 million of potential cost reductions in all other non-mining activities, including general, administrative, land and environmental areas and has already realized $0.9 million in the period ended September 30, 2015, as compared to the same period in 2014. The Company incurred approximately $0.7 million in severance costs during the first nine months of 2015, in mining and general and administrative expenses, associated with organizational cost reductions.

The accompanying unaudited condensed consolidated financial statements have been prepared assuming the Company will continue as a going concern which considers the realization of assets and discharge of liabilities in the normal course of business and does not include any adjustments that might result from the outcome of uncertainties noted below.

The Company had net losses from operations since 2012, and an accumulated deficit of $193.1 million at September 30, 2015. For the three month period ended September 30, 2015 the Company realized net loss of $4.3 million and generated $0.4 million of cash provided by operations. As of September 30, 2015, the Company had current assets of $5.1 million (including cash and cash equivalents of $2.5 million) and current liabilities of $12.8 million.

The Company's success depends on its ability to recover precious metals, process them, and successfully sell them for more than the cost of production. The Company has limited control over its costs and has no ability to control the market prices. The costs of exploration and production may fluctuate as a result of a number of factors, such as the changing composition of ore grade or mineralized material production, and metallurgy and exploration activities in response to the physical shape and location of the ore body or deposit. In addition, costs are affected by the price of commodities, such as fuel and electricity. Such commodities are at times subject to volatile price movements, including increases that could make production unprofitable. A material increase in production costs or a decrease in the price of gold or other minerals could materially affect the Company's ability to generate cash flow.

Mineral exploration, particularly for gold and other precious metals, is highly speculative in nature, involves many risks, and frequently is nonproductive. If gold mineralization is discovered, it may take a number of years from the initial phases of drilling until production is possible, if ever, during which time the economic feasibility of production may change. Substantial expenditures are required to establish ore reserves through drilling and analysis, to develop metallurgical processes to extract metal from the ore, and in the case of new properties, to develop the processing facilities and infrastructure at any site chosen for mineral exploration. There can be no assurance that any gold reserves or mineralized material that may be discovered or acquired in the future, if any, will be in sufficient quantities or of adequate grade to justify commercial operations or that the funds required for mineral production operation can be obtained on a timely or reasonable basis, if at all. In addition, any mineralized material or reserves that may be identified, if any, will be depleted by production.

The capital expenditures and time required to develop and explore our properties are considerable and changes in costs, construction schedules, delays in such construction or both, can adversely affect project economics and expected production and profitability.

The Company’s current capital resources include cash and cash equivalents and other working capital resources, cash generated through operations, and existing financing arrangements, including a lease financing agreement and a revolving credit facility (the “Revolving Credit Facility”) with Auramet International, LLC ("Auramet"). Under the Revolving Credit Facility, the Company may have borrowings up to $8 million outstanding at any given time, subject to satisfying certain conditions and obtaining certain consents. The Revolving Credit Facility has a maturity of February 6, 2017 and allows for re-advances on the facility up to the $8 million availability. The Company has financed its exploration, development, and start up activities principally from the sale of equity securities and, to a lesser extent, debt financing. While the Company has been successful in the past in obtaining the necessary capital to support its operations, including registered equity financings from its existing shelf registration, borrowings, or other means, there is no assurance that the Company will be able to obtain additional equity capital or other financing, if needed. The Company believes it will have sufficient funds to sustain its operations during the next 12 months as a result of the sources of funding detailed above.

Future production rates and gold prices below management’s expectations would adversely affect the Company’s results of operations, financial condition and cash flows. If the Company was unable to obtain any necessary additional funds, this could have an immediate material effect on liquidity and could raise substantial doubt about the Company’s ability to continue as a going concern. In such case, the Company could be required to limit or discontinue certain business plans, activities or operations, reduce or delay certain capital expenditures or sell certain assets or businesses. There can be no assurance that the Company would be able to take any of such actions on favorable terms, in a timely manner or at all.

The Revolving Credit Facility contains a covenant that requires the Company to maintain a minimum liquidity balance of $1 million (including cash and cash equivalents, plus 90% of the value of any doré that has been picked up by a secured carrier but not yet paid for, as of any date of determination). The Revolving Credit Facility additionally contains customary representations, warranties, affirmative covenants, negative covenants, and events of default, as well as conditions to borrowings. The Company is in compliance with all required covenants.

For the remainder of 2015, the Company plans on spending approximately $1.0 million in road and capital expenditures and approximately $1.4 million on the underground drift, drilling and some infrastructural development for the Lucerne underground mine plan development advancement. The Company also plans to pay down an additional $3.0 million in debt obligations, including $1.2 million on the Revolving Credit Facility.

### Critical Accounting Policies and Estimates

There have not been any material changes to the critical accounting policies and estimates previously disclosed in our Annual Report on Form 10-K for the year ended December 31, 2014.

## Market risk

As filed, 939 characters.

**Metal Price –** Changes in the market price of gold may significantly affect our profitability and cash flow. Gold prices fluctuate widely due to factors such as; demand, global mine production levels, investor sentiment, central bank reserves, and the value of the U.S. dollar.

In the third quarter of 2015, Gold Bullion prices averaged approximately $1,124.01 per ounce, up from a quarterly low close of $1,080.80 on July 24, 2015. Gold has fluctuated from that low to a high of $1,168.00 during the quarter. Silver prices averaged $14.93 per ounce, also gaining from a quarterly low of $14.27 on August 27, 2015 to a high of over $15.64 per ounce during the third quarter. The outlook for these markets remains mixed, driven primarily by uncertainty over U.S. fiscal and monetary policy.

With the exception of the above, there have been no material changes in the market risks discussed in Item 7A of our Annual Report on Form 10-K.

## Controls and procedures

As filed, 2,581 characters.

### A. Disclosure

### Evaluation of Disclosure Controls and Procedures

As of the end of the period covered by this Quarterly Report on Form 10-Q, management performed, with the participation of our Principal Executive Officer and our Principal Financial Officer, an evaluation of the effectiveness of our disclosure controls and procedures as defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934 (“Exchange Act”). Our disclosure controls and procedures are designed to ensure that information required to be disclosed in the reports we file or submit under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in the Exchange Act and SEC’s rules, and that such information is accumulated and communicated to our management, including our Principal Executive Officer and Principal Financial Officer, to allow timely decisions regarding required disclosures. There are inherent limitations to the effectiveness of any system of disclosure controls and procedures, including the possibility of human error and the circumvention or overriding of the controls and procedures. Accordingly, even effective disclosure controls and procedures can only provide reasonable assurance of achieving their control objectives. Each of our Principal Executive Officer and Principal Financial Officer concluded that, as of September 30, 2015, our disclosure controls and procedures were effective.

#### Design and Evaluation of Internal Control over Financial Reporting

Our management is responsible for establishing and maintaining adequate internal control over financial reporting as defined in Exchange Act Rule 13a-15(f) and 15d-15(f). Our management assessed the effectiveness of our internal control over financial reporting as of September 30, 2015. In making this assessment, management used the criteria for effective internal control over financial reporting described in the “Internal Control-Integrated Framework” (2013) set forth by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Based on the assessment, management concluded that, as of September 30, 2015, our internal control over financial reporting was effective based on those criteria.

### B. Internal Control over Financial Reporting

No change in our internal control over financial reporting, as such term is defined in Exchange Act Rule 13(a)-15 occurred during the fiscal quarter ended September 30, 2015, that materially affected or is reasonably likely to materially affect our internal control over financial reporting.

## Risk factors

As filed, 153 characters.

There have not been any material changes to the risk factors previously disclosed in our Annual Report on Form 10-K for the year ended December 31, 2014.

Filed Oct 23, 2015.
Source: SEC EDGAR, the filing index for accession 0001120970-15-000048. Last ingested by Listed: Nov 4, 2026, 17:20 ET. No prices; not investment advice.