# Smart Powerr Corp.: Form 10-Q for the period ended Mar 31, 2010

- Company: [Smart Powerr Corp.](/companies/creg.md) (CIK 721693)
- Form: 10-Q
- Filed: 2010-05-12
- Accepted by EDGAR: May 12, 2010, 20:03 ET
- Period: 2010-03-31
- Accession: 0001144204-10-026481
- Inline XBRL: no
- Main document: https://www.sec.gov/Archives/edgar/data/721693/000114420410026481/v184377_10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/721693/000114420410026481/

## Management's discussion and analysis

As filed, 58,427 characters.

### Note Regarding Forward-Looking Statements

*This quarterly report on Form 10-Q and other reports filed by the Company from time to time with the SEC (collectively the “Filings”) contain or may contain forward-looking statements and information that are based upon beliefs of, and information currently available to, Company’s management as well as estimates and assumptions made by Company’s management. Readers are cautioned not to place undue reliance on these forward-looking statements, which are only predictions and speak only as of the date hereof. When used in the filings, the words “anticipate”, “believe”, “estimate”, “expect”, “future”, “intend”, “plan”, or the negative of these terms and similar expressions as they relate to Company or Company’s management identify forward-looking statements. Such statements reflect the current view of Company with respect to future events and are subject to risks, uncertainties, assumptions, and other factors (including the statements in the section “results of operations” below), and any businesses that Company may acquire. Should one or more of these risks or uncertainties materialize, or should the underlying assumptions prove incorrect, actual results may differ significantly from those anticipated, believed, estimated, expected, intended, or planned.*

*Although the Company believes that the expectations reflected in the forward-looking statements are based on reasonable assumptions, the Company cannot guarantee future results, levels of activity, performance, or achievements. Except as required by applicable law, including the securities laws of the United States, the Company does not intend to update any of the forward-looking statements to conform these statements to actual results. Readers are urged to carefully review and consider the various disclosures made throughout the entirety of this annual report, which attempt to advise interested parties of the risks and factors that may affect our business, financial condition, results of operations, and prospects.*

*Our financial statements are prepared in US Dollars and in accordance with accounting principles generally accepted in the United States. See “Foreign Currency Translation and Comprehensive Income (Loss)” below for information concerning the exchange rates at which Renminbi (“RMB”) were translated into US Dollars (“USD”) at various pertinent dates and for pertinent periods.*

### OVERVIEW OF BUSINESS BACKGROUND

We originally began operations as a Colorado corporation known as Boulder Brewing Company, or Boulder Brewing. We were incorporated in Colorado on May 8, 1980 and operated as a microbrewery of various beers. Boulder Brewing was unable to become profitable within any segment of its core business, became illiquid, and was forced to divest itself of all of its assets. Boulder Brewing became dormant without any operations or assets in the second quarter of 1990.

In September 2001, Boulder Brewing changed its state of incorporation from Colorado to Nevada and changed its name to Boulder Acquisitions, Inc., or Boulder Acquisitions. From the date of reincorporation until June 23, 2004, Boulder Acquisitions had no material operations or assets.

On June 23, 2004, we completed a stock exchange transaction with the stockholders of Sifang Holdings Co., Ltd. (“Sifang Holdings”). The exchange was consummated under Nevada and Cayman Islands law pursuant to the terms of a Securities Exchange Agreement dated as of June 23, 2004 by and among Boulder Acquisitions, Sifang Holdings and the stockholders of Sifang Holdings. Pursuant to the Securities Exchange Agreement, we issued 13,782,636 shares of our common stock to the stockholders of Sifang Holdings, representing approximately 89.7% of our post-exchange issued and outstanding common stock, in exchange for 100% of the outstanding capital stock of Sifang Holdings.

Effective August 6, 2004, we changed our name from Boulder Acquisitions, Inc. to China Digital Wireless, Inc. From August 2004 to December 2006, we primarily engaged in the business of pager and mobile phone distribution and provided value added information services to the customers in the PRC. We gradually phased out and substantially scaled down most of the business of mobile phone distribution and provision of pager and mobile phone value-added information services, and on May 10, 2007, the Company approved and announced that it completely ceased and discontinued these businesses.

In December 2006, we began to engage in business activities in the energy saving and recycling industry, including purchasing certain equipment, devices, hardware and software for the construction and installation of TRT systems and other renewable energy products.

On March 8, 2007, we changed our name from China Digital Wireless, Inc. to China Recycling Energy Corporation.

Our current business is primarily conducted through our wholly-owned subsidiary, Sifang Holdings, its wholly-owned subsidiaries, Huahong New Energy Technology Co., Ltd. (“Huahong”) and Shanghai TCH, Shanghai TCH’s wholly-owned subsidiaries, Xi’an TCH Energy Technology Company, Ltd (“Xi’an TCH”) and Xingtai Huaxin Energy Tech Co., Ltd. (“Huaxin”), and Xi’an TCH’s 80% owned subsidiary Erdos TCH Energy Saving Development Co., Ltd (“Erdos TCH”), a joint venture between Xi’an TCH and Erdos Metallurgy Co., Ltd. Shanghai TCH was established as a foreign investment enterprise in Shanghai under the laws of the PRC on May 25, 2004, with registered capital of $7.2 million. Xi’an TCH was established as a foreign investment enterprise in Xi’an, Shannxi Province under the laws of the PRC on November 8, 2007. Huaxin was incorporated in Xingtai, PRC in November, 2007. Erdos TCH was incorporated in April 2009. Huahong was registered in February 13, 2009.

On April 8, 2007, our Board of Directors approved and made effective a TRT Project Joint-Operation Agreement (“Joint-Operation Agreement”) which was conditionally entered on February 1, 2007 between Shanghai TCH and Xi’an Yingfeng Science and Technology Co., Ltd. (“Yingfeng”). Yingfeng is a Chinese company that is located in Xi’an, Shaanxi Province, China, which is engaged in the business of designing, selling, installing, and operating TRT systems and other renewable energy products. Due to Yingfeng’s lack of capital in pursuing this project alone, Yingfeng sought Shanghai TCH’s cooperation. On October 31, 2007, Shanghai TCH entered an asset-transfer agreement with Yingfeng to transfer from Yingfeng to Shanghai TCH all electricity-generating related assets owned by Yingfeng. As a result, the contractual relationships between Shanghai TCH and Yingfeng under the TRT Project Joint-Operation Agreement entered on April 8, 2007 were terminated.

On April 14, 2009, the Company incorporated a joint venture (“JV”) between Xi’an TCH and Erdos Metallurgy Co., Ltd. (“Erdos”) to recycle waste heat from Erdos ‘s metal refining plants to generate power and steam, which will then be sold back to Erdos. The name of the JV is Inner Mongolia Erdos TCH Energy Saving Development Co., Ltd (“Erdos TCH”) with a term of 20 years. Erdos contributed 10% of the total investment of the project, and Xi’an TCH contributed 90% of the total investment. Xi’an TCH and Erdos will receive 80% and 20% of the profit from the JV, respectively, until Xi’an TCH has received a complete return on its investment. Xi’an TCH and Erdos will then receive 60% and 40% of the profit from the JV, respectively.

### Our Projects

#### Hebei Xingtai Steel Group Project

On April 8, 2007, our Board of Directors approved and made effective a TRT Project Joint-Operation Agreement (“Joint-Operation Agreement”) which was conditionally entered on February 1, 2007 between Shanghai TCH and Xi’an Yingfeng Science and Technology Co., Ltd. (“Yingfeng”). Under the Joint-Operation Agreement, Shanghai TCH and Yingfeng jointly pursued a project to design, construct, install and operate two TRT systems for Xingtai Iron and Steel Company, Ltd. (“Xingtai”). Shanghai TCH provided various forms of investments and properties into the project including cash, hardware, software, equipment, major components and devices. In return, Shanghai TCH obtained all the rights, titles, benefits and interests that Yingfeng originally had under the Project Contract, including but not limited to the regular cash payments made by Xingtai and other property rights and interests. On October 31, 2007, Shanghai TCH entered an asset-transfer agreement with Yingfeng to transfer from Yingfeng to Shanghai TCH all electricity-generating related assets owned by Yingfeng. According to the transferred contracts, Shanghai TCH installed and owns two TRT systems and leases them to Xingtai for a term of 5 years, from January 25, 2007 to January 25, 2012. During the lease term, Zhangzhi will pay Shanghai TCH a monthly rent of RMB 0.9 million ($0.13 million) for usage of the systems. Assuming all amounts due under the lease have been paid, Shanghai TCH will transfer the title of the systems to Xingtai free of charge.

#### Shanxi Zhangzhi Steel Group Project

Under the Joint-Operation Agreement discussed above, Shanghai TCH and Yingfeng also jointly pursued a project contract, which was entered between Yingfeng and Zhangzhi Iron and Steel Company, Ltd. (“Zhangzhi”),on June 22, 2006, to design, construct, install and operate a TRT system for Zhangzhi Iron. Shanghai TCH provided various forms of investments and properties into the project including cash, hardware, software, equipment, major components and devices. In return, Shanghai TCH obtained all the rights, titles, benefits and interests that Yingfeng originally had under the Project Contract, including but not limited to the regular cash payments made by Xingtai and other property rights and interests. On October 31, 2007, Shanghai TCH acquired this contract as part of its asset-transfer agreement with Yingfeng as discussed above. According to the transferred contracts, Shanghai TCH installed and owns a TRT system and leases it to Zhangzhi for a term of 13 years, from July 25, 2007 to July 25, 2020. During the lease term, Zhangzhi will pay Shanghai TCH a monthly rent of RMB 1.1 million ($0.16 million). After the term is over and all due rents are paid off, Shanghai TCH will transfer the title of the system to Zhangzhi free of charge.

#### Shengwei Group – Tongchuan Project

In November 2007, Shanghai TCH signed a cooperative agreement with Shengwei Group to build two sets of 12MW cement low temperature heat power generation systems for Shengwei’s two 2,500-tons-per-day cement manufacturing lines in Jin Yang and for a 5,000-tons-per-day cement manufacturing line in Tong Chuan. At the end of 2008, construction of the cement low temperature heat power generation in Tong Chuan was completed at a cost of approximately $6,191,000 (RMB 43,000,000) and put into operation. Under the original agreement, the ownership of the cement low temperature heat power generation systems would belong to Shengwei from the date the projects were put into service. Shanghai TCH is responsible for the daily maintenance and repair of the projects, and charges Shengwei a monthly electricity fee based on the actual power generated by the projects at 0.4116 RMB per KWH for an operating period of five years with the assurance from Shengwei of a properly functioning 5,000-tons-per-day cement manufacturing line and not less than 7,440 heat hours per year for the electricity generator system. Shengwei Group collateralized the cement manufacturing line in Tong Chuan to guarantee its obligations to provide the minimum electricity income from the power generator system under the agreement during the operating period. At the end of the five year operating period, Shanghai TCH will have no further obligations under the cooperative agreement. On May 20, 2009, Shanghai TCH entered into a supplementary agreement with Shengwei Group to amend the timing for title transfer to the end of the lease term. In addition, the supplementary agreement provided that Shanghai TCH will charge Shengwei based on actual power usage subject to a minimum of $0.31 million (RMB 2.1 million) per month during the operating period.

#### Binhai Project

In September 2008, we signed a contract to recycle waste gas and waste heat for China Zhonggang Binhai Enterprise Ltd. (“Zhonggang”) in Cangzhou City, Hebei Province, which subsequently transferred the contract to Zhongbao Binhai Nickel Co., Ltd. (“Zhongbao”) in July 2009, a world-class nickel-alloy manufacturing joint venture between Zhonggang and Shanghai Baoshan Steel Group established in June 2009. According to the contract, we will install a 7MW electricity-generation system, which will reduce in excess of 20,000 tons of carbon dioxide emissions every year. Total investment in this project is $7.8 million (RMB 55 million). Construction and preparation on the project began in March of 2009, but we did not incur any material expenses for the project in 2009 due to a delay in the installation of furnace cove by Zhonggang. Construction resumed in February 2010, and we now expect the project to be completed in first quarter of 2011. Zhongbao agrees to purchase all the electricity and steam to be generated from the project for the term of 9 years, at a pre-agreed price. Zhongbao also agrees to guarantee the minimum monthly payment of electricity and steam fees no less than $365,000 (RMB 2.5 million) per month after the deduction of all raw material costs of Zhongbao used by Xi’an TCH. At the end of the term, the waste energy recycling system will be transferred to Zhongbao at a nominal price of RMB 1.

#### Erdos Phase I Project

On April 14, 2009, the Company incorporated the JV between Xi’an TCH and Erdos Metallurgy Co., Ltd. (“Erdos”) to recycle waste heat from Erdos's metal refining plants to generate power and steam, which will then be sold back to Erdos. The name of the JV is Inner Mongolia Erdos TCH Energy Saving Development Co., Ltd (“Erdos TCH”) with a term of 20 years, and the initial registered capital of the JV was $2,635,000 (RMB 18,000,000). On September 30, 2009, Xi’an TCH injected additional capital of $4.03 million (RMB 27,500,000). In November of 2009, Xi’an TCH injected further capital of $5.05 million (RMB 34,500,000). As of March 31, 2010, total registered capital was $11.71 million (RMB 80,000,000), of which, $11.45 million (RMB 78,200,000) was from Xi’an TCH, and $0.26 million (RMB 1,800,000) was from Erdos. At April 15, 2010, total registered capital was raised up to $17.55 million (RMB120 million), of which, $16.37 million (RMB112 million) was contributed by Xi’an TCH and $1.18 million (RMB 8 million) was from Erdos Metallurgy. Total investment for the project is estimated at approximately $74 million (RMB 500 million) with an initial investment of $17.55 million (RMB 120,000,000). Erdos contributed 10% of the total investment of the project, and Xi’an TCH contributed 90% of the total investment. Xi’an TCH and Erdos will receive 80% and 20% of the profit from the JV, respectively, until Xi’an TCH has received a complete return on its investment. Xi’an TCH and Erdos will then receive 60% and 40% of the profit from the JV, respectively. The profits to be distributed will be computed based on Chinese generally accepted accounting principles. The principal difference between US GAAP and Chinese GAAP with regards to the Erdos TCH project is that a sales-type lease under US GAAP is treated as an operating lease under Chinese GAAP. When the term of the JV expires, Xi’an TCH will transfer its equity in the JV to Erdos at no additional cost.

At the end of 2009, Erdos TCH completed the first 9MW power station of Phase I of the project and put it into operation. At the end of March 2010, Erdos TCH completed the construction of Phase I through completion of the second 9MW power station and delivery of it for operation, Phase I includes two 9MW systems for a combined 18MW power capacity. Pursuant to the Co-operation Agreement and the supplement agreements signed between Erdos and Erdos TCH, Erdos shall purchase all the electricity and steam to be generated from the JV’s power generation systems. Erdos TCH leased the two 9 MW systems to Erdos and will be responsible for their operation and maintenance. For each phase of the project, the lease term is 20 years starting from the date of completion of the phase. Erdos agreed to pay a fixed minimum of $0.22 million (RMB 1.5 million) per month for each 9MW capacity power generation system. In addition Erdos will pay the actual amount if the actual sale of the electricity generated is more than $0.22 million (RMB 1.5 million) monthly per unit. Effective January 1, 2010, Erdos TCH outsourced to an independent third party the operation and maintenance of the first 9MW power generation project for $ 922,000 (RMB 6.72 million) per year. After 20 years, the units will be transferred to Erdos without any charge.

#### Shengwei Group – Jinyang Project

On June 29, 2009, construction of the cement low temperature heat power generation system in Jin Yang was completed at a cost of approximately $7,318,000 (RMB 50,000,000) and put into operation. Shanghai TCH charges Shengwei a technical service fee of $336,600 (RMB 2,300,000) monthly for the sixty months of the lease term. Shengwei has the right to purchase the ownership of the cement low temperature heat power generation system for $29,000 (RMB 200,000) at the end of lease term. Shengwei is required to provide assurance of properly functioning 5,000-tons-per-day cement manufacturing lines and not less than 7,440 heat hours per year for the cement low temperature heat power generation. Shengwei Group collateralized the cement manufacturing lines in Jin Yang to guarantee its obligations to provide the minimum electricity income from the waste energy power generator system under the agreement during the operating period. Effective July 1, 2009, Shanghai TCH outsourced the operation and maintenance of the cement low temperature heat power generation systems in Tong Chuan and JinYang to a third party for $732,000 (RMB 5,000,000) per year.

#### Shenmu Project

On September 30, 2009, Xi’an TCH delivered to Shenmu County Jiujiang Trading Co., Ltd. (“Shenmu”) a set of three 6 MW capacity waste gas power generation systems pursuant to a Cooperative Contract on Coke-oven Gas Power Generation Project (including its Supplementary Agreement) and a Gas Supply Contract for Coke-oven Gas Power Generation Project. These contracts are for 10 years and provide that Xi’an TCH will recycle coke furnace gas from the coke-oven plant of Shenmu to generate power, which will be supplied back to Shenmu. Shenmu agrees to supply Xi’an TCH the coke-oven gas free of charge. Under the contracts, Shenmu will pay us an annual “energy-saving service fee” of approximately $5.6 million in equal monthly installments for the life of the contracts, as well as such additional amount as may result from the supply of power to Shenmu in excess of 10.8 million kilowatt hours per month. We are responsible for operating the projects and will do so through an unrelated third party. Shenmu guarantees that monthly gas supply will not be lower than 21.6 million standard cubic meters. If gas supply is less, Shenmu agrees to pay Xi’an TCH the energy-saving service fee described above for up to 10.80 million kilowatt-hours per month. Xi’an TCH maintains the ownership of the project throughout the term of the contracts, including the already completed investment, design, equipment, construction and installation as well as the operation and maintenance of the project. At the end of the 10-year term, ownership of the projects transfers to Shenmu at no charge. Shenmu gave a lien on its production line to guarantee its performance under the Contracts. Shenmu’s three major stockholders provided an unlimited joint liability guarantee to Xi’an TCH for Shenmu’s performance under the Contracts and the Yulin Huiyuan Group, an independent third party, provides a guarantee to Xi’an TCH for Shenmu’s performance under the Contracts.

### CRITICAL ACCOUNTING POLICIES AND ESTIMATES

Our management’s discussion and analysis of our financial condition and results of operations are based on our consolidated financial statements, which have been prepared in accordance with accounting principles generally accepted in the United States (“US GAAP”). The preparation of these financial statements requires us to make estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the date of the financial statements as well as the reported net sales and expenses during the reporting periods. On an ongoing basis, we evaluate our estimates and assumptions. We base our estimates on historical experience and on various other factors that we believe are reasonable under the circumstances, the results of which form the basis for making judgments about the carrying value of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates under different assumptions or conditions.

While our significant accounting policies are more fully described in Note 2 to our consolidated financial statements, we believe that the following accounting policies are the most critical to aid you in fully understanding and evaluating this management discussion and analysis.

### Basis of presentation

These accompanying consolidated financial statements were prepared in accordance with US GAAP and pursuant to the rules and regulations of the SEC for annual financial statements.

### Basis of consolidation

The consolidated financial statements include the accounts of CREG and, its JV, Sifang Holdings, Shanghai TCH, and Shanghai TCH’s subsidiaries Xi’an TCH, Huaxin and Huahong. Xi’an TCH, Huaxin and Huahong engage in the same business as Shanghai TCH. Substantially all of the Company’s revenues are derived from the operations of Shanghai TCH and its subsidiaries, which represent substantially all of the Company’s consolidated assets and revenues. All significant inter-company accounts and transactions have been eliminated in consolidation.

### Use of estimates

In preparing these consolidated financial statements, management makes estimates and assumptions that affect the reported amounts of assets and liabilities in the balance sheets and revenues and expenses during the year reported. Actual results may differ from these estimates.

### Accounts receivable and concentration of credit risk

Accounts receivable are recorded at the invoiced amounts and do not bear interest. The Company extends unsecured credit to its customers in the ordinary course of business but mitigates the associated risks by performing credit checks and actively pursuing past due accounts. An allowance for doubtful accounts is established and determined based on managements’ assessment of known requirements, aging of receivables, payment history, the customer’s current credit worthiness and the economic environment.

Financial instruments that potentially subject the Company to credit risk primarily are accounts receivable, receivable on sales-type leases and other receivables. The Company does not require collateral or other security to support these receivables. The Company conducts periodic reviews of its clients’ financial condition and customer payment practices to minimize collection risk on accounts receivable.

The operations of the Company are located in the PRC. Accordingly, the Company’s business, financial condition, and results of operations may be influenced by the political, economic, and legal environments in the PRC, as well as by the general state of the PRC economy.

### Inventory

Inventory is valued at the lower of cost or market. Cost of work in progress and finished goods comprises direct material cost, direct production cost and an allocated portion of production overheads.

### Property and Equipment

Property and equipment are stated at cost, net of accumulated depreciation. Expenditures for maintenance and repairs are expensed as incurred; additions, renewals and betterments are capitalized. When property and equipment are retired or otherwise disposed of, the related cost and accumulated depreciation are removed from the respective accounts, and any gain or loss is included in operations. Depreciation of property and equipment is provided using the straight-line method over estimated lives as follows:

|  |  |
| --- | --- |
| Building | 20 years |
| Vehicle | 2 - 5 years |
| Office and Other Equipment | 2 - 5 years |
| Software | 2 - 3 years |

### Revenue Recognition

#### Sales-type leasing and related revenue recognition

The Company constructs and then leases waste energy recycling power generating projects to its customers. The Company usually transfers ownership of the waste energy recycling power generating projects to its customers at the end of each lease. Investment in these projects is recorded as investment in sales-type leases in accordance with Statement of Financial Accounting Standards (“SFAS”) No. 13, “Accounting for Leases” (codified in Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) Topic 840) and its various amendments and interpretations. The Company manufactures and constructs the waste energy recycling power generating projects and finances its customers for the price of the projects. The sales and cost of sales are recognized at the time of sale or inception of the lease. The investment in sales-type leases consists of the sum of the total minimum lease payments receivable less unearned interest income and estimated executory cost. Unearned interest income is amortized to income over the lease term so as to produce a constant periodic rate of return on the net investment in the lease. While a portion of revenue is recognized at the inception of the lease, the cash flow from the sales-type lease occurs over the course of the lease.

#### Operating Lease

During 2008, The Company leased two energy recycling power generation equipment systems which were then subleased to two different parties under one-year, non-cancellable leases with the rents paid in full. The leases and the subleases were not renewed when they expired in April 2009. These transactions were accounted for as operating leases. In an operating lease revenue is recognized as payments are received; the initial direct costs were deferred and amortized over the lease term on a straight-line basis, thus matching them against rental revenue.

### Foreign Currency Translation and Comprehensive Income (Loss)

The Company’s functional currency is the Renminbi (“RMB”). For financial reporting purposes, RMB were translated into United States dollars (“USD”) as the reporting currency. Assets and liabilities are translated at the exchange rate in effect at the balance sheet date. Revenues and expenses are translated at the average rate of exchange prevailing during the reporting period. Translation adjustments arising from the use of different exchange rates from period to period are included as a component of stockholders’ equity as “Accumulated other comprehensive income”. Gains and losses resulting from foreign currency transactions are included in income. There has been no significant fluctuation in exchange rate for the conversion of RMB to USD after the balance sheet date.

The Company uses SFAS 130 “Reporting Comprehensive Income”. Comprehensive income is comprised of net income and all changes to the statements of stockholders’ equity, except those due to investments by stockholders, changes in paid-in capital and distributions to stockholders.

### NEW ACCOUNTING PRONOUNCEMENTS

In October 2009, the FASB issued an Accounting Standards Update (“ASU”) regarding accounting for own-share lending arrangements in contemplation of convertible debt issuance or other financing. This ASU requires that at the date of issuance of the shares in a share-lending arrangement entered into in contemplation of a convertible debt offering or other financing, the shares issued shall be measured at fair value and be recognized as an issuance cost, with an offset to additional paid-in capital. Further, loaned shares are excluded from basic and diluted earnings per share unless default of the share-lending arrangement occurs, at which time the loaned shares would be included in the basic and diluted earnings-per-share calculation. This ASU is effective for fiscal years beginning on or after December 15, 2009, and interim periods within those fiscal years for arrangements outstanding as of the beginning of those fiscal years. The adoption of this ASU did not have a material impact on the Company’s consolidated financial statements.

In August 2009, the FASB issued an ASU regarding measuring liabilities at fair value. This ASU provides additional guidance clarifying the measurement of liabilities at fair value in circumstances in which a quoted price in an active market for the identical liability is not available; under those circumstances, a reporting entity is required to measure fair value using one or more of valuation techniques, as defined. This ASU is effective for the first reporting period, including interim periods, beginning after the issuance of this ASU. The adoption of this ASU did not have a material impact on the Company’s consolidated financial statements.

On July 1, 2009, the Company adopted ASU No. 2009-01, “Topic 105 - Generally Accepted Accounting Principles - amendments based on Statement of Financial Accounting Standards No. 168 , “The FASB Accounting Standards Codification™ and the Hierarchy of Generally Accepted Accounting Principles” (“ASU No. 2009-01”). ASU No. 2009-01 re-defines authoritative GAAP for nongovernmental entities to be only comprised of the FASB Accounting Standards Codification™ (“Codification”) and, for SEC registrants, guidance issued by the SEC. The Codification is a reorganization and compilation of all then-existing authoritative GAAP for nongovernmental entities, except for guidance issued by the SEC. The Codification is amended to effect non-SEC changes to authoritative GAAP. Adoption of ASU No. 2009-01 only changed the referencing convention of GAAP in Notes to the Consolidated Financial Statements.

In June 2009, the FASB issued SFAS No. 167, “Amendments to FASB Interpretation No. 46(R)” (“SFAS 167”), codified as FASB ASC Topic 810-10, which modifies how a company determines when an entity that is insufficiently capitalized or is not controlled through voting (or similar rights) should be consolidated. SFAS 167 clarifies that the determination of whether a company is required to consolidate an entity is based on, among other things, an entity’s purpose and design and a company’s ability to direct the activities of the entity that most significantly impact the entity’s economic performance. SFAS 167 requires an ongoing reassessment of whether a company is the primary beneficiary of a variable interest entity. SFAS 167 also requires additional disclosures about a company’s involvement in variable interest entities and any significant changes in risk exposure due to that involvement. SFAS 167 is effective for fiscal years beginning after November 15, 2009. The adoption of SFAS 167 did not have an impact on its financial condition, results of operations or cash flows.

In June 2009, the FASB issued SFAS No. 166, “Accounting for Transfers of Financial Assets — an amendment of FASB Statement No. 140” (“SFAS 166”), codified as FASB Topic ASC 860, which requires entities to provide more information regarding sales of securitized financial assets and similar transactions, particularly if the entity has continuing exposure to the risks related to transferred financial assets. SFAS 166 eliminates the concept of a “qualifying special-purpose entity,” changes the requirements for derecognizing financial assets and requires additional disclosures. SFAS 166 is effective for fiscal years beginning after November 15, 2009. The adoption of SFAS 166 did not have an impact on its financial condition, results of operations or cash flows.

In May 2009, the FASB issued SFAS No. 165, “Subsequent Events” (“SFAS 165”) codified in FASB ASC Topic 855-10-05, which provides guidance to establish general standards of accounting for and disclosures of events that occur after the balance sheet date but before financial statements are issued or are available to be issued. SFAS 165 also requires entities to disclose the date through which subsequent events were evaluated as well as the rationale for why that date was selected. SFAS 165 is effective for interim and annual periods ending after June 15, 2009, and accordingly, the Company adopted this pronouncement during the second quarter of 2009. SFAS 165 requires that public entities evaluate subsequent events through the date that the financial statements are issued.

In April 2009, the FASB issued FASB Staff Position (“FSP”) No. SFAS 107-1 and APB 28-1, “Interim Disclosures about Fair Value of Financial Instruments,” which is codified in FASB ASC Topic 825-10-50. This FSP essentially expands the disclosure about fair value of financial instruments that were previously required only annually to also be required for interim period reporting. In addition, the FSP requires certain additional disclosures regarding the methods and significant assumptions used to estimate the fair value of financial instruments. These additional disclosures were required beginning with the quarter ending June 30, 2009.

In April 2009, the FASB issued FSP No. FAS 115-2 and FAS 124-2, “Recognition and Presentation of Other-Than-Temporary Impairments,” which is codified in FASB ASC Topic 320-10. This FSP modifies the requirements for recognizing other-than-temporarily impaired debt securities and changes the existing impairment model for such securities. The FSP also requires additional disclosures for both annual and interim periods with respect to both debt and equity securities. Under the FSP, impairment of debt securities will be considered other-than-temporary if an entity (1) intends to sell the security, (2) more likely than not will be required to sell the security before recovering its cost, or (3) does not expect to recover the security’s entire amortized cost basis (even if the entity does not intend to sell). The FSP further indicates that, depending on which of the above factor(s) causes the impairment to be considered other-than-temporary, (1) the entire shortfall of the security’s fair value versus its amortized cost basis or (2) only the credit loss portion would be recognized in earnings while the remaining shortfall (if any) would be recorded in other comprehensive income. FSP 115-2 requires entities to initially apply the provisions of the standard to previously other-than-temporarily impaired debt securities existing as of the date of initial adoption by making a cumulative-effect adjustment to the opening balance of retained earnings in the period of adoption. The cumulative-effect adjustment potentially reclassifies the noncredit portion of a previously other-than-temporarily impaired debt security held as of the date of initial adoption from retained earnings to accumulate other comprehensive income. The Company adopted FSP No. SFAS 115-2 and SFAS 124-2 beginning April 1, 2009. This FSP had no material impact on the Company’s financial position, results of operations or cash flows.

In April 2009, the FASB issued FSP No. SFAS 157-4, “Determining Fair Value When the Volume and Level of Activity for the Asset or Liability Have Significantly Decreased and Identifying Transactions That Are Not Orderly” (“FSP No. SFAS 157-4”). FSP No. SFAS 157-4, which is codified in FASB ASC Topics 820-10-35-51 and 820-10-50-2, provides additional guidance for estimating fair value and emphasizes that even if there has been a significant decrease in the volume and level of activity for the asset or liability and regardless of the valuation technique(s) used, the objective of a fair value measurement remains the same. The Company adopted FSP No. SFAS 157-4 beginning April 1, 2009. This FSP had no material impact on the Company’s financial position, results of operations or cash flows.

### RESULTS OF OPERATIONS

### Comparison of Three Months Ended March 31, 2010 and 2009

The following table sets forth the results of our operations for the periods indicated as a percentage of net sales:

|  | 2010 $% of Sales |  | 2009 $% of Sales |  |
| --- | ---: | ---: | ---: | ---: |
| Sales | $10,125,436 | 100% | $4,322,893 | 100% |
| Sales of Products | 10,125,436 | 100% | - | - |
| Rental income | - | - | 4,322,893 | 100% |
| Cost of sales | (7,798,245) | 77% | (3,021,673) | 70% |
| Cost of products | (7,798,245) | 77% | - | - |
| Rental expense | - | - | (3,021,673) | 70% |
| Gross profit | 2,327,191 | 23% | 1,301,220 | 30% |
| Interest income on sales-type lease | 3,094,568 | 31% | 1,198,531 | 28% |
| Total operating income | 5,421,759 | 54% | 2,499,751 | 58% |
| Total Operating expenses | (1,359,697) | 14% | (795,438) | 18% |
| Income from operations | 4,062,062 | 40% | 1,704,313 | 39% |
| Total non-operating income (expenses) | (439,896) | (4)% | (60,313) | (1.4)% |
| Income before income tax | 3,622,166 | 36% | 1,644,000 | 38% |
| Income tax expense | 1,036,766 | 10% | 568,111 | 13% |
| Net income attributable to noncontrolling interest | (394,441) | (4 ) % | (40) | - |
| Net income | $2,190,959 | 22% | $1,075,849 | 25% |

*SALES.* Net sales for the first quarter of 2010 were $10.13 million while our net sales for the first quarter of 2009 were $4.32 million, an increase in revenues of $5.80 million. The increase was due to the completion and sale of the second 9MW capacity power station of Erdos Phase I project through sales-type lease in March of 2010, which included two 9MW units, the first 9MW capacity power station was completed and sold in December of 2009. While in the same quarter of 2009, we recorded rental income of $4.32 million from our operating lease of two power generating systems, which were not renewed when they expired in April 2009 . For the sales-type lease, sales and cost of sales are recorded at the time of leases; the interest income from the sales-type leasing is our other major revenue source in addition to sales revenue.

*COST OF SALES.* Cost of sales for the first quarter of 2010 was $7.80 million while our cost of sales for the comparable period in 2009 was $3.02 million, an increase of $4.78 million. Our cost of sales consisted of the second 9MW capacity power station of Erdos Phase I project. For the first quarter of 2009, the cost of sales was for the operating lease as we leased two power generating systems under one-year, non-cancellable leases since April of 2008, which we subleased for higher monthly rental income under a one-year, non-cancellable lease.

*GROSS PROFIT*. Gross profit was $2.33 million for the first quarter of 2010 compared to $1.30 million for the comparable period in 2009, representing a gross margin of 23% and 30% for the first quarters of 2010 and 2009, respectively. The gross profit was mainly from the selling of the Erdos Phase I second 9MW capacity power station in the first quarter of 2010, while in the first quarter of 2009, it was mainly for the operating lease business in connection with leasing out two energy recycling power generation equipment systems since April of 2008.

*OPERATING INCOME*. Operating income was $5.42 million for the first quarter of 2010 while our operating income for the comparable period in 2009 was $2.50 million, an increase of $2.92 million. The growth in operating income was mainly due to the increase in interest income from selling and leasing our energy saving systems through sales-type leasing. Interest income on sales-type leasing for the first quarter of 2010 was $3.09 million, $1.89 million increase from $1.20 million for the comparable period in 2009, this increase was mainly due to increased interest income from energy saving systems that were sold and put into operation since April of 2009. During the first quarter of 2010, the interest income was based on seven systems: two TRT systems, two CHPG systems, one WGPG system, and two waste heat power generating systems associated with our Erdos Phase I project. During the first quarter of 2009, the interest income was derived from our two TRT systems and one CHPG system.

*OPERATING EXPENSES.* Operating expenses consisted of selling, general and administrative expenses totaling $1.36 million for the first quarter of 2010 compared to $0.80 million for the comparable period in 2009, an increase of $0.56 million or 71%. The increase was due to proportional increases in our payroll, traveling and marketing expenses as a result of our increased sales and expansion of our business; in addition, we recorded $743,400 compensation expense for stock options and warrants during the three months ended March 31, 2010, compared to $389,376 for the same period in 2009.

*NET INCOME.* Our net income for the first quarter of 2010 was $2.19 million compared to $1.08 million for the comparable period in 2009, an increase of $1.11 million. This increase in net income was mainly due to the sales of the second 9MW capacity power station of Erdos Phase I project and additional interest income for energy saving systems that were sold and put into operation after April of 2009. In addition, we recorded $445,000 interest expense related to beneficial conversion feature for the convertible note that was issued April 29, 2008 with the conversion price to be tied with 2009 audited net profit for the first quarter of 2010 compared to no similar non-operating expense for the comparable period in 2009.

### LIQUIDITY AND CAPITAL RESOURCES

### Comparison of Three Months Ended March 31, 2010 and 2009

As of March 31, 2010, the Company had cash and cash equivalents of $3.24 million, other current assets were $10.14 million and current liabilities were $13.12 million. Working capital was $0.26 million. The debt-to-equity ratio was 0.93:1 at March 31, 2010.

The following is a summary of cash provided by or used in each of the indicated types of activities during three months ended March 31, 2010 and 2009:

| Cash provided by (used in): | 2010 | 2009 |
| --- | ---: | ---: |
| Operating Activities | $5,554,062 | $4,434,268 |
| Investing Activities | (5,259,145) | (1,464,751) |
| Financing Activities | 1,830,783 | - |

Net cash flow provided by operating activities was $5.55 million during the first quarter of 2010, as compared to $4.43 million provided in the comparable period of 2009. The increase in net cash inflow was mainly due to the increase in net income as well as increase in account payable and tax payable.

Net cash flow used in investing activities was $5.26 million in the first quarter of 2010, compared to $1.46 million used in the comparable period of 2009. The increase of net cash flow used in investing activities was mainly due to our gross investment receivable of $1.99 million for the second 9MW capacity power station of Erdos Phase-I recycling waste heat power generating system, and $2.91 million payment for construction in progress of Erdos Phase II and III projects and Zhongbao Binhai project, as well as restricted cash of $0.26 million to the bank as collateral for the bank acceptance.

Net cash flow provided by financing activities was $1.83 million for the quarter ended March 31, 2010 compared to net cash provided by financing activities of $0 for the comparable period in 2009. The increase was mainly due to the quick advance from related parties for $1.2 million for paying certain operating expenses of Erdos project and $0.63 million from bank acceptance.

We believe we have sufficient cash to continue our current business through March, 2011 due to stable recurring receipts from sales type leases. As of March 31, 2010, we have two TRT systems, two CHPG systems, one WGPG system and two recycling waste heat power generating systems, currently generating net cash flow. In addition, we may have access to a revolving line of credit and other forms of bank loans in case of instant need for working capital. We believe we have sufficient cash resources to cover our anticipated capital expenditures in 2010.

We do not believe that inflation has had a significant negative impact on our results of operations during 2010.

### Off-Balance Sheet Arrangements

We have not entered into any other financial guarantees or other commitments to guarantee the payment obligations of any third parties. We have not entered into any derivative contracts that are indexed to our shares and classified as stockholder’s equity or that are not reflected in our consolidated financial statements. Furthermore, we do not have any retained or contingent interest in assets transferred to an unconsolidated entity that serves as credit, liquidity or market risk support to such entity. We do not have any variable interest in any unconsolidated entity that provides financing, liquidity, market risk or credit support to us or engages in leasing, hedging or research and development services with us.

### Contractual Obligations

#### Convertible Notes Payable

On April 29, 2008, we issued and sold to Carlyle Asia Growth Partners III, L.P. and CAGP III Co-Investment, L.P. a 5% Secured Convertible Promissory Note of $5,000,000. The terms for the Note were amended and restated on April 29, 2009.

This note bears interest at 5% and matures on April 29, 2011. The principal amount of the note, together with any interest thereon, convert, at the option of the holders at any time on or after March 16, 2010 and prior to maturity, into shares of the Company’s common stock at an initial conversion price tied to the after-tax net profits of the Company for the fiscal year ending December 31, 2009. Based on our after-tax profits in 2009, the initial conversion price is $1.29 per share, and this note was convertible in full into 3,875,969 shares of our common stock as of March 31, 2010.

The obligation of the Company under this note is ranked senior to all other debt of the Company. The note is secured by a security interest granted to the investors pursuant to a share pledge agreement. The note is not considered to have an embedded beneficial conversion feature because the conversion price and convertible shares are contingent upon future net profits.

On April 29, 2009, we issued an 8% Secured Convertible Promissory Note of $3 million to Carlyle Asia Growth Partners III, L.P. with maturity on April 29, 2012. The note holder has the right to convert all or any part of the aggregate outstanding principal amount of this note, together with interest, if any, into shares of our common stock, at any time on or after March 16, 2010 and prior to the maturity date (or such later date on which this note is paid in full), at a conversion price per share of common stock equal to US $0.80, and this note was convertible in full into 3,750,000 shares of our common stock as of March 31, 2010. These shares rank pari-passu with those convertible under the 5% Secured Convertible Promissory Note.

#### Notes Payable – Bank Acceptances

We had notes payable for bank acceptances of $2,094,253 at March 31, 2010, which was collateralized by depositing the same amount of cash in the bank as restricted cash. We endorsed the bank acceptances to vendors as payment of our obligations. Most of the bank acceptances have a maturity of less than six months.

#### Loan Payable – Collective Capital Trust Plan

On December 3, 2009, Beijing International Trust Co., Ltd. (“Beijing Trust”) formed a Low Carbon Fortune-Energy Recycling No. 1 Collective Capital Trust Plan (“Plan”). Under the Plan, Beijing Trust raised RMB 181,880,000 (US$ 26.75 million) through the sale of 181,880,000 total trust units at RMB 1 per unit. All amounts raised under the Plan were loaned to Erdos TCH in connection with its waste heat power generation projects Phase II and Phase III construction and operation, pursuant to the Capital Trust Loan Agreement entered into by Erdos TCH Energy Saving Development Co., Ltd and Beijing Trust dated November 19, 2009.

The Plan included 145,500,000 category A preferred trust units ($ 21.4 million), consisting of category A1 preferred trust 12,450,000 units (US$ 1.8 million), category A2 preferred trust 15,000,000 units (US$ 2.2 million), category A3 preferred trust 118,050,000 units (US$ 17.4 million); and 36,380,000 category B secondary trust units (US$ 5.35 million), consisting of category B1 secondary trust 9,100,000 units (US$ 1.34 million) and category B2 secondary trust 27,280,000 units (US$ 4.01 million). The B1 units were purchased by members of management of Erdos TCH and the B2 units were purchased by Xi’an TCH. Under the Agreement, the annual base interest rate is 9.94% for A1 preferred trust fund units with a term of two years, 11% for A2 preferred trust fund units with a term of three years, 12.05% for A3 preferred trust fund units and 8.35% for the category B secondary trust fund units, each with a term of four years.

Erdos TCH gave a lien on its equipment, assets and accounts receivable to guarantee the loans under the Agreement. Xi’an TCH and Mr. Guohua Ku, our CEO, also gave unconditional and irrevocable joint liability guarantees to Beijing Trust for Erdos TCH’s performance under the Agreement. Erdos (the minority stockholder and customer of Erdos TCH) provided a commitment letter on minimum power purchase from Erdos TCH.

On December 18, 2009, an additional RMB 25,000,000 (US$3.68 million) was raised by Beijing Trust to support the Company’s Erdos Power Generation Projects. Beijing Trust sold 25,000,000 trust units at RMB 1 per unit which included 20,000,000 category A1 preferred trust units (US$ 2.94 million) and 5,000,000 category B2 secondary trust units (US$ 0.74 million). The B2 units were purchased by Xi’an TCH.

Besides the base interest rate, Erdos TCH must share the benefits of the Clean Development Mechanism (“CDM”) under the Kyoto Protocol equally with Beijing Trust during the term of the loan, as well as to pay a management incentive benefit to be calculated by a formula tied to Erdos TCH’s net profit and average registered capital of the fiscal year prior to the maturity date of the loan. Under the formula the management incentive benefit is paid at the end of year four and can range between 0% and 100% of the net profit of Erdos TCH in the fiscal year prior to the maturity date of the loan depending upon the amount of average contributed capital of Erdos TCH at the time of measurement.

At December 31, 2009, Beijing Trust had sold 206,880,000 units for RMB 206,880,000 ($30.3 million), of which, 9,100,000 units ($1.3 million) was purchased by the management of Erdos TCH, 32,280,000 units purchased by Xi’an TCH for $4.7 million was considered as an investment by Xi’an TCH into Erdos TCH, accordingly, was eliminated in the consolidation. The net long term loan payable under this trust plan was $25.6 million at March 31, 2010.

On April 15, 2010, Beijing Trust completed the second expansion of the Plan. The second expansion of the Plan raised RMB 93,120,000 ($13.69 million) through the sale of 93,120,000 trust units sold at RMB 1 per unit. All amounts raised under the Second Expansion of the Plan are to be loaned to Erdos TCH. The second expansion of the Plan includes 2,800,000 category A1 preferred trust units ($0.41 million), 5,000,000 category A2 preferred trust units ($0.73 million), 66,700,000 category A3 preferred trust units ($9,81 million) and 4,650,000 category B1 preferred trust units ($0,68 million), 13,970,000 category B2 secondary trust units ($2.05 million). The B1 units were purchased by members of management of Erdos TCH and the B2 units have been purchased by Xi’an TCH. With the completion of the second expansion of the Plan, the Low Carbon Fortune-Energy Recycling No. 1 Collective Capital Trust Plan has reached RMB 300,000,000 ($44.12 million) and completed all its trust plan fund raising work.

#### Revolving Financing Agreement

On October 26, 2009, Xi’an TCH and Erdos TCH entered into a one-year Non Promissory Short Term Revolving Financing Agreement (the “Citi Agreement”), dated and effective from October 12, 2009, with Citi Bank (China) Co., Ltd., Shanghai Branch (“Citi”). The maximum financing provided in the Citi Agreement is RMB 20 million ($2.9 million). The Citi Agreement allows for Xi’an TCH and Erdos TCH to borrow money to maintain current liquidity for notes receivable, such as trade notes payable to the Company, or in order to capitalize on discounts for early payment of accounts payable, such as for equipment or raw materials. The maximum maturity date for each financing is six months. The interest rate for any note discount financing will be determined by the relevant note discount documents and the interest rate for accounts payable financing will be determined by the relevant accounts payable documents.

The proceeds received under the financing arrangement are to be used for working capital and to purchase raw materials. The amounts received pursuant to the Citi Agreement are secured by an account maintained by the Company with Citi, accounts receivable of Xi’an TCH and Erdos TCH and the guarantees of Shanghai TCH and Guohua Ku, our Chairman of the Board and Chief Executive Officer.

Xi’an TCH and Erdos TCH agreed not to use the loan to pay for related party transactions without Citi’s permission. Xi’an TCH and Erdos TCH also agreed to deposit their income from sales of products and services into their accounts with Citi with a combined average monthly income amount of no less than RMB 5 million ($0.73 million). Xi’an TCH and Erdos TCH may not draw on the Citi Agreement until the monthly income amount reaches 80% of expected income amount, as set forth in the Citi Agreement for that month. Each loan of Xi’an TCH and Erdos TCH should be no more than 35% of the maximum financing limit. If the single monthly income amount for Xi’an TCH and Erdos TCH is less than 70% of the expected income amount of that month, Citi has the right to suspend, cancel or terminate the financing and accelerate the maturity date of any outstanding amount and request immediate reimbursement. As of March 31, 2010 Xi’an TCH and Erdos TCH had no amounts outstanding under the Citi Agreement

#### Commitments

### Zhonggang Binhai 7MW Capacity Electricity Generation Project

In September 2008, we signed a contract to recycle waste gas and waste heat for China Zhonggang Binhai Enterprise Ltd. (“Zhonggang”) in Cangzhou City, Hebei Province, which subsequently transferred the contract to Zhongbao Binhai Nickel Co., Ltd. (“Zhongbao”) in July 2009, a world-class nickel-alloy manufacturing joint venture between Zhonggang and Shanghai Baoshan Steel Group established in June 2009. According to the contract, we will install a 7MW electricity-generation system, which will reduce in excess of 20,000 tons of carbon dioxide emissions every year. Total investment in this project is $7.8 million (RMB 55 million). Construction and preparation on the project began in March of 2009, but we did not incur any material expenses for the project in 2009 due to a delay in the installation of furnace cove by Zhonggang. Construction resumed in February 2010 and the Company paid $1.93 million as construction in progress for this project as of March 31, 2010. We now expect the project to be completed in first quarter of 2011. Zhongbao agrees to purchase all the electricity and steam to be generated from the project for the term of 9 years, at a pre-agreed price. Zhongbao also agrees to guarantee the minimum monthly payment of electricity and steam fees no less than $365,000 (RMB 2.5 million) per month after the deduction of all raw material costs of Zhongbao used by Xi’an TCH. At the end of the term, the waste energy recycling system will be transferred to Zhongbao at a nominal price of RMB 1.

### Erdos Phase II and III of Power Generation Projects

In April 2009, Erdos TCH signed a contract with Erdos Metallurgy to recycle heat from groups of furnaces of Erdos Metallurgy’s metal refining plants to generate power and steam, which will then be sold back to Erdos Metallurgy. According to the contract, Erdos TCH will install a group of power generation projects with a total of 70MW power capacity, which may increase to 120MW , and 30-ton steam per hour, with an estimated total investment in excess of $75 million (RMB 500 million). We split the construction of the projects into three phases, two units of power generation in Phase I with a total of 18MW power capacity, three units in Phase II with a total of 27MW power capacity and one unit in Phase III with 25MW power capacity. For each phase of the project, the lease term is 20 years starting from the date of completion of the phase. During the lease term, Erdos TCH will be responsible for operating the projects and charge Erdos Metallurgy for supply of electricity and steam. Erdos Metallurgy agreed to pay a fixed minimum of $0.22 million (RMB 1.5 million) per month for each 9MW capacity power generation system. Effective January 1, 2010, Erdos TCH outsourced to an independent third party the operation and maintenance of the first 9MW power generation project for $ 922,000 (RMB 6.72 million) per year. After 20 years, the units will be transferred to Erdos without any charge.

In December 2009, Beijing Trust formed a Low Carbon Fortune-Energy Recycling No. 1 Collective Capital Trust Plan to raise up to total of RMB 300 million ($ 44.1 million) of capital to loan to Erdos TCH to support the construction of the Erdos projects. At April 15, 2010, the Company announced the completion of the Trust Plan fund raising. During the first quarter of 2010, Erdos power generation system Phase I project has been completed and put into operation while the projects of Erdos Phase II and Phase III are under construction. At March 31, 2009, the Company has paid $28.68 million for Phase II and Phase III. The Company currently expects to complete Phase II and Phase III in 2010.

## Controls and procedures

As filed, 2,759 characters.

### Evaluation of disclosure controls and procedures

We evaluated the effectiveness of the design and operation of our “disclosure controls and procedures” as defined in Rule 13a-15(e) under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) as of the end of the period covered by this report. This evaluation (the “disclosure controls evaluation”) was done under the supervision and with the participation of management, including our chief executive officer (“CEO”) and chief financial officer (“CFO”). Rules adopted by the SEC require that in this section of our Quarterly Report on Form 10-Q we present the conclusions of the CEO and the CFO about the effectiveness of our disclosure controls and procedures as of the end of the period covered by this report based on the disclosure controls evaluation.

This quarterly report does not include an attestation report of our registered public accounting firm regarding internal control over financial reporting. Management’s report was not subject to attestation by our registered public accounting firm pursuant to temporary rules of the SEC that permit us to provide only management’s report in this quarterly report.

### Objective of Controls

Our disclosure controls and procedures are designed so that information required to be disclosed in our reports filed or submitted under the Exchange Act, such as this Quarterly Report on Form 10-Q, is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms. Our disclosure controls and procedures are also intended to ensure that such information is accumulated and communicated to our management, including the CEO and CFO, as appropriate to allow timely decisions regarding disclosure controls and procedures, including the possibility of human error and the circumvention or overriding of the controls and procedures. Accordingly, even effective disclosure controls and procedures can only provide reasonable assurance of achieving their control objectives, and management necessarily is required to use its judgment in evaluating the cost-benefit relationship of possible disclosure controls and procedures.

### Conclusion

Based upon the disclosure controls evaluation, our CEO and CFO have concluded that as of the end of the period covered by this report, our disclosure controls and procedures were effective to provide reasonable assurance that the foregoing objectives have been achieved.

### Changes in Internal Control Over Financial Reporting

There has been no change in our internal control over financial reporting during the quarter ended March 31, 2010 that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

Filed May 12, 2010.
Source: SEC EDGAR, the filing index for accession 0001144204-10-026481. Last ingested by Listed: Oct 24, 2026, 14:55 ET. No prices; not investment advice.