## Management's discussion and analysis

As filed, 68,863 characters.

### Note Regarding Forward-Looking Statements

*This quarterly report on Form 10-Q and other reports filed by the Company from time to time with the SEC (collectively the “Filings”) contain or may contain forward-looking statements and information that are based upon beliefs of, and information currently available to, Company’s management as well as estimates and assumptions made by Company’s management. Readers are cautioned not to place undue reliance on these forward-looking statements, which are only predictions and speak only as of the date hereof. When used in the filings, the words “anticipate”, “believe”, “estimate”, “expect”, “future”, “intend”, “plan”, or the negative of these terms and similar expressions as they relate to Company or Company’s management identify forward-looking statements. Such statements reflect the current view of Company with respect to future events and are subject to risks, uncertainties, assumptions, and other factors (including the statements in the section “results of operations” below), and any businesses that Company may acquire. Should one or more of these risks or uncertainties materialize, or should the underlying assumptions prove incorrect, actual results may differ significantly from those anticipated, believed, estimated, expected, intended, or planned.*

*Although the Company believes that the expectations reflected in the forward-looking statements are based on reasonable assumptions, the Company cannot guarantee future results, levels of activity, performance, or achievements. Except as required by applicable law, including the securities laws of the United States, the Company does not intend to update any of the forward-looking statements to conform these statements to actual results. Readers are urged to carefully review and consider the various disclosures made throughout the entirety of this report, which attempts to advise interested parties of the risks and factors that may affect our business, financial condition, results of operations, and prospects.*

*Our financial statements are prepared in US Dollars and in accordance with accounting principles generally accepted in the United States. See “Foreign Currency Translation and Comprehensive Income (Loss)” below for information concerning the exchange rates at which Renminbi (“RMB”) were translated into US Dollars (“USD”) at various pertinent dates and for pertinent periods.*

### OVERVIEW OF BUSINESS BACKGROUND

We originally began operations as a Colorado corporation known as Boulder Brewing Company, or Boulder Brewing. We were incorporated in Colorado on May 8, 1980 and operated as a microbrewery of various beers. Boulder Brewing was unable to become profitable within any segment of its core business, became illiquid, and was forced to divest itself of all of its assets. Boulder Brewing became dormant without any operations or assets in 1990.

In September 2001, Boulder Brewing changed its state of incorporation from Colorado to Nevada and changed its name to Boulder Acquisitions, Inc., or Boulder Acquisitions. From the date of reincorporation until June 23, 2004, Boulder Acquisitions had no material operations or assets.

On June 23, 2004, we completed a stock exchange transaction with the stockholders of Sifang Holdings Co., Ltd. (“Sifang Holdings”). The exchange was consummated under Nevada and Cayman Islands law pursuant to the terms of a Securities Exchange Agreement dated as of June 23, 2004 by and among Boulder Acquisitions, Sifang Holdings and the stockholders of Sifang Holdings. Pursuant to the Securities Exchange Agreement, we issued 13,782,636 shares of our common stock to the stockholders of Sifang Holdings, representing approximately 89.7% of our post-exchange issued and outstanding common stock, for 100% of the outstanding capital stock of Sifang Holdings.

Effective August 6, 2004, we changed our name from Boulder Acquisitions, Inc. to China Digital Wireless, Inc. From August 2004 to December 2006, we primarily engaged in pager and mobile phone distribution and provided value added information services to the customers in the PRC. We phased out and scaled down most of the business of mobile phone distribution and provision of pager and mobile phone value-added information services, and on May 10, 2007, the Company approved and announced that it completely ceased and discontinued these businesses.

In December 2006, we began to engage in business activities in the energy saving and recycling industry, including purchasing certain equipment, devices, hardware and software for the construction and installation of TRT systems and other renewable energy products.

On March 8, 2007, we changed our name from China Digital Wireless, Inc. to China Recycling Energy Corporation.

Our current business is primarily conducted through our wholly-owned subsidiary, Sifang Holdings, its wholly-owned subsidiaries, Huahong New Energy Technology Co., Ltd. (“Huahong”) and Shanghai TCH, Shanghai TCH’s wholly-owned subsidiaries, Xi’an TCH Energy Technology Company, Ltd (“Xi’an TCH”) and Xingtai Huaxin Energy Tech Co., Ltd. (“Huaxin”), and Xi’an TCH’s subsidiary Erdos TCH Energy Saving Development Co., Ltd (“Erdos TCH”), in which 90% of the investment will be from Xi’an TCH, a joint venture between Xi’an TCH and Erdos Metallurgy Co., Ltd. Shanghai TCH was established as a foreign investment enterprise in Shanghai under the laws of the PRC on May 25, 2004, currently with a registered capital of $29.80 million. Xi’an TCH was established as a foreign investment enterprise in Xi’an, Shannxi Province under the laws of the PRC on November 8, 2007. Huaxin was incorporated in Xingtai, PRC in November, 2007. Erdos TCH was incorporated in April, 2009. Huahong was incorporated in February, 2009.

On April 8, 2007, our Board of Directors approved and made effective a TRT Project Joint-Operation Agreement (“Joint-Operation Agreement”) which was conditionally entered into on February 1, 2007 between Shanghai TCH and Xi’an Yingfeng Science and Technology Co., Ltd. (“Yingfeng”). Yingfeng is a Chinese company located in Xi’an, Shaanxi Province, China, which is engaged in the business of designing, selling, installing, and operating TRT systems and other renewable energy products. Due to Yingfeng’s lack of capital in pursuing this project alone, Yingfeng sought Shanghai TCH’s cooperation. On October 31, 2007, Shanghai TCH entered an asset-transfer agreement with Yingfeng to transfer from Yingfeng to Shanghai TCH all electricity-generating related assets owned by Yingfeng. As a result, the contractual relationships between Shanghai TCH and Yingfeng under the TRT Project Joint-Operation Agreement entered on April 8, 2007 were terminated.

On April 14, 2009, the Company incorporated a joint venture (“JV”) between Xi’an TCH and Erdos Metallurgy Co., Ltd. (“Erdos”) to recycle waste heat from Erdos’ metal refining plants to generate power and steam, which will then be sold back to Erdos. The name of the JV is Inner Mongolia Erdos TCH Energy Saving Development Co., Ltd (“Erdos TCH”) with a term of 20 years. As of September 30, 2010, Erdos contributed 7% of the total investment of the project, and Xi’an TCH contributed 93% of the total investment. Xi’an TCH and Erdos will receive 80% and 20% of the profit from the JV, respectively, until Xi’an TCH has received a complete return on its investment. Xi’an TCH and Erdos will then receive 60% and 40% of the profit from the JV, respectively.

### Our Projects

#### Hebei Xingtai Steel Group Project

On April 8, 2007, our Board of Directors approved and made effective a TRT Project Joint-Operation Agreement (“Joint-Operation Agreement”) which was conditionally entered into on February 1, 2007 between Shanghai TCH and Xi’an Yingfeng Science and Technology Co., Ltd. (“Yingfeng”). Under the Joint-Operation Agreement, Shanghai TCH and Yingfeng jointly pursued a project to design, construct, install and operate two TRT systems for Xingtai Iron and Steel Company, Ltd. (“Xingtai”). Shanghai TCH provided various forms of investments and properties into the project including cash, hardware, software, equipment, major components and devices. In return, Shanghai TCH obtained all the rights, titles, benefits and interests that Yingfeng originally had under the Project Contract, including but not limited to the regular cash payments made by Xingtai and other property rights and interests. On October 31, 2007, Shanghai TCH entered an asset-transfer agreement with Yingfeng to transfer from Yingfeng to Shanghai TCH all electricity-generating related assets owned by Yingfeng. According to the transferred contracts, Shanghai TCH installed and owns two TRT systems and leases them to Xingtai for five years, from January 25, 2007 to January 25, 2012. During the lease, Xingtai will pay Shanghai TCH monthly rent of RMB 0.9 million ($0.13 million) to use the systems. Assuming all amounts due under the lease have been paid, Shanghai TCH will transfer the title of the systems to Xingtai free of charge.

#### Shanxi Zhangzhi Steel Group Project

Under the Joint-Operation Agreement discussed above, Shanghai TCH and Yingfeng also jointly pursued a project contract, which was entered into between Yingfeng and Zhangzhi Iron and Steel Company, Ltd. (“Zhangzhi”) on June 22, 2006, to design, construct, install and operate a TRT system for Zhangzhi Iron. Shanghai TCH provided various forms of investments and properties into the project including cash, hardware, software, equipment, major components and devices. In return, Shanghai TCH obtained all the rights, titles, benefits and interests that Yingfeng originally had under the Project Contract, including but not limited to the regular cash payments made by Xingtai and other property rights and interests. On October 31, 2007, Shanghai TCH acquired this contract as part of its asset-transfer agreement with Yingfeng as discussed above. According to the transferred contracts, Shanghai TCH installed and owns a TRT system and leases it to Zhangzhi for a term of 13 years, from July 25, 2007 to July 25, 2020. During the lease term, Zhangzhi will pay Shanghai TCH a monthly rent of RMB 1.1 million ($0.16 million). After the term is over and all due rents are paid, Shanghai TCH will transfer the title of the system to Zhangzhi free of charge.

#### Shengwei Group – Tongchuan Project

In November 2007, Shanghai TCH signed a cooperative agreement with Shengwei Group to build two sets of 12MW cement low temperature heat power generation systems for Shengwei’s two 2,500-tons-per-day cement manufacturing lines in Jin Yang and for a 5,000-tons-per-day cement manufacturing line in Tong Chuan. At the end of 2008, construction of the cement low temperature heat power generation in Tong Chuan was completed at a cost of approximately $6,191,000 (RMB 43,000,000) and put into operation. Under the original agreement, the ownership of the cement low temperature heat power generation systems would belong to Shengwei from the date the projects were put into service. Shanghai TCH is responsible for the daily maintenance and repair of the projects, and charges Shengwei a monthly electricity fee based on the actual power generated by the projects at 0.4116 RMB per KWH for an operating period of five years with the assurance from Shengwei of a properly functioning 5,000-tons-per-day cement manufacturing line and not less than 7,440 heat hours per year for the electricity generator system. Shengwei Group collateralized the cement manufacturing line in Tong Chuan to guarantee its obligations to provide the minimum electricity income from the power generator system under the agreement during the operating period. At the end of the five year operating period, Shanghai TCH will have no further obligations under the cooperative agreement. On May 20, 2009, Shanghai TCH entered into a supplementary agreement with Shengwei Group to amend the timing for title transfer to the end of the lease term. In addition, the supplementary agreement provided that Shanghai TCH will charge Shengwei based on actual power usage subject to a minimum of $0.31 million (RMB 2.1 million) per month during the operating period.

#### Shengwei Group – Jinyang Project

On June 29, 2009, construction of the cement low temperature heat power generation system in Jin Yang was completed at a cost of approximately $7,318,000 (RMB 50,000,000) and put into operation. Shanghai TCH charges Shengwei a technical service fee of $336,600 (RMB 2,300,000) monthly for the sixty months of the lease term. Shengwei has the right to purchase the ownership of the cement low temperature heat power generation system for $29,000 (RMB 200,000) at the end of lease term. Shengwei is required to provide assurance of properly functioning 5,000-tons-per-day cement manufacturing lines and not less than 7,440 heat hours per year for the cement low temperature heat power generation. Shengwei Group collateralized the cement manufacturing lines in Jin Yang to guarantee its obligations to provide the minimum electricity income from the waste energy power generator system under the agreement during the operating period. Effective July 1, 2009, Shanghai TCH outsourced the operation and maintenance of the cement low temperature heat power generation systems in Tong Chuan and JinYang to a third party for $732,000 (RMB 5,000,000) per year.

#### Shenmu Project

On September 30, 2009, Xi’an TCH delivered to Shenmu County Jiujiang Trading Co., Ltd. (“Shenmu”) a set of three 6 MW capacity waste gas power generation systems pursuant to a Cooperative Contract on Coke-oven Gas Power Generation Project (including its Supplementary Agreement) and a Gas Supply Contract for Coke-oven Gas Power Generation Project. These contracts are for 10 years and provide that Xi’an TCH will recycle coke furnace gas from the coke-oven plant of Shenmu to generate power, which will be supplied back to Shenmu. Shenmu agrees to supply Xi’an TCH the coke-oven gas free of charge. Under the contracts, Shenmu will pay us an annual “energy-saving service fee” of approximately $5.6 million in equal monthly installments for the life of the contracts, as well as such additional amount as may result from the supply of power to Shenmu in excess of 10.8 million kilowatt hours per month. We are responsible for operating the projects and will do so through an unrelated third party. Shenmu guarantees that monthly gas supply will not be less than 21.6 million standard cubic meters. If gas supply is less, Shenmu agrees to pay Xi’an TCH the energy-saving service fee described above for up to 10.8 million kilowatt-hours per month. Xi’an TCH maintains the ownership of the project throughout the term of the contracts, including the already completed investment, design, equipment, construction and installation as well as the operation and maintenance of the project. At the end of the 10-year term, ownership of the projects transfers to Shenmu at no charge. Shenmu gave a lien on its production line to guarantee its performance under the Contracts. Shenmu’s three major stockholders provided an unlimited joint liability guarantee to Xi’an TCH for Shenmu’s performance under the Contracts and the Yulin Huiyuan Group, an independent third party, provides a guarantee to Xi’an TCH for Shenmu’s performance under the Contracts.

#### Erdos Phase I Project

On April 14, 2009, the Company incorporated the JV between Xi’an TCH and Erdos Metallurgy Co., Ltd. (“Erdos”) to recycle waste heat from Erdos' metal refining plants to generate power and steam, which will then be sold back to Erdos. The name of the JV is Inner Mongolia Erdos TCH Energy Saving Development Co., Ltd (“Erdos TCH”) with a term of 20 years, and initial registered capital of $2,635,000 (RMB 18,000,000). On September 30, 2009, Xi’an TCH injected additional capital of $4.03 million (RMB 27,500,000). In November of 2009, Xi’an TCH injected further capital of $5.05 million (RMB 34,500,000). As of March 31, 2010, total registered capital was $11.71 million (RMB 80,000,000), of which $11.45 million (RMB 78,200,000) was from Xi’an TCH and $0.26 million (RMB 1,800,000) was from Erdos. At April 15, 2010, total registered capital was increased to $17.55 million (RMB 120 million), of which $16.37 million (RMB 112 million) was contributed by Xi’an TCH and $1.18 million (RMB 8 million) was from Erdos Metallurgy. Total investment for the project is estimated at approximately $74 million (RMB 500 million) with an initial investment of $17.55 million (RMB 120,000,000). As of September 30, 2010, Erdos contributed 7% of the total investment of the project, and Xi’an TCH contributed 93% of the total investment. Xi’an TCH and Erdos will receive 80% and 20% of the profit from the JV, respectively, until Xi’an TCH has received a complete return on its investment. Xi’an TCH and Erdos will then receive 60% and 40% of the profit from the JV, respectively. The profits to be distributed will be computed based on Chinese generally accepted accounting principles. The principal difference between US GAAP and Chinese GAAP with regards to the Erdos TCH project is that a sales-type lease under US GAAP is treated as an operating lease under Chinese GAAP. When the term of the JV expires, Xi’an TCH will transfer its equity in the JV to Erdos at no additional cost.

At the end of 2009, Erdos TCH completed the first 9MW power station of Phase I of the project and put it into operation. At the end of March 2010, Erdos TCH completed the construction of Phase I through completion of the second 9MW power station and delivery of it for operation. Phase I includes two 9MW systems for a combined 18MW power capacity. Pursuant to the Co-operation Agreement and the supplement agreements signed between Erdos and Erdos TCH, Erdos shall purchase all the electricity and steam to be generated from the JV’s power generation systems. Erdos TCH leased the two 9 MW systems to Erdos and is responsible for their operation and maintenance. For each phase of the project, the lease term is 20 years starting from the date of completion of the phase. Erdos agreed to pay a fixed minimum of $0.22 million (RMB 1.5 million) per month for each 9MW capacity power generation system. In addition Erdos will pay the actual amount if the actual sale of the electricity generated is more than $0.22 million (RMB 1.5 million) monthly per unit. Effective January 1, 2010 and April, 2010 respectively, Erdos TCH outsourced to an independent third party the operation and maintenance of the two 9MW power generation projects for $922,000 (RMB 6.27 million) each per year. After 20 years, the units will be transferred to Erdos without any charge.

As of September 30, 2010 the projects of Erdos Phase II and Phase III are under construction. At September 30, 2010, the Company has paid $45.91 million for Phase II and Phase III. The Company currently expects to complete Phase II in 2010 and Phase III in the first quarter of 2011.

#### Biomass Project

On January 20, 2010, Xi’an TCH entered into a Technical Reconstruction Letter of Intent with Xueyi Dong (“Dong”) a natural person with Chinese citizenship for Xi’an TCH reconstructing and transforming a Thermal Power Generation Systems owned by Dong into a 12MW Biomass Power Generation Systems (“Biomass Systems” or “BMPG”) for approximately RMB 15 million (approximately $2.2 million), of which, RMB 7 million ( approximately $1.03 million) was payable to Dong, and RMB 8 million (approximately $1.18 million) was payable to one of the Company’s shareholders, who had previously paid that amount to Dong on behalf of the Company.

After the successful transformation of the systems, Xi’an TCH entered into a Biomass Power Generation Asset Transfer Agreement (the “Transfer Agreement”) with Dong on June 29, 2010. Under the Transfer Agreement, Dong transferred the Biomass Systems to Xi’an TCH, and Xi’an TCH will pay Dong RMB 100,000,000 (approximately $14,705,900) for the systems, including RMB 20,000,000 in cash and RMB 80,000,000 in shares of the Company’s common stock. The stock price will be the same as in the Company’s first public offering which is expected to occur in 2010 or 2011, but in no circumstance less than $4 per share. The exchange rate between U.S. Dollar and Chinese RMB in connection with the stock issuance is 1:6.8. At September 30, 2010, the Company had recorded accounts payable of RMB 10,000,000 (approximately $1.47 million) and shares to be issued of $11.78 million in connection with this transaction.

On June 29, 2010, Xi’an TCH entered into a Biomass Power Generation Project Lease Agreement with PuCheng XinHengYuan Biomass Power Generation Co., Ltd., (“XHY”). Under this lease agreement, Xi’an TCH leased this same set of 12MW biomass power generation systems to XHY at minimum RMB 1,900,000 per month (approximately $279,400) for 15 years. The leasing fee will increase proportionately with the biomass generated electricity fee in China during the term of this lease agreement.

#### Zhongbao Project

On September 30, 2010, Xi’an TCH delivered to Zhongbao Binhai Nickel Co., Ltd. (“Zhongbao”) a set of 7 megawatt capacity Waste Heat Power Generation (“WHPG”) system, which is an integral part of the facilities designed to produce 80,000 tons of nickel-alloy per year according to the recovery and power generation of waste heat agreement with Zhongbao, an agreement that was transferred from China Zhonggang Binhai Enterprise Ltd. (“Zhonggang”) in July 2009. Zhongbao is a nickel-alloy manufacturing joint venture between Zhonggang and Shanghai Baoshan Steel Group established in June 2009. Total investment in this project was approximately $7.8 million (RMB 55 million). The Contract is for 9 years and provided that Xi’an TCH will recycle waste heat from the nickel-alloy rotary kilns of Zhongbao to generate power and steam, which will be supplied back to Zhongbao, and help to reduce over 20,000 tons of carbon dioxide emissions every year. By the end of the term, the system shall be transferred to Zhongbao at RMB 1. Under the Contracts, Zhongbao will pay the Company a monthly “energy-saving service fee” based on the volume of the electricity and steam generated from the WHPG system in the prior month within the first five days of each month at a pre-agreed price, but no less than the minimum monthly payment of $224,000 (RMB 1.5 million). Zhongbao agrees to supply Xi’an TCH the nickel-alloy rotary kilns gas, water and compressed air free of charge, except salty water at RMB 6.3 per ton. Zhongbao also guarantees to continuously supply not less than 6800 heat hours per year for the WHPG, or the operating term will be extended accordingly. Xi’an TCH outsourced its operation and maintenance works to a third party for annual payments of RMB 2.4 million (approximately $352,000) for the whole operation period. In addition, Xi’an TCH shall be responsible for applying Clean Development Mechanism (“CDM”) and the net proceeds from CDM will be distributed between Zhonggang and Xi’an TCH at 60% and 40%, respectively. The CDM work has not commenced as of the report date.

### CRITICAL ACCOUNTING POLICIES AND ESTIMATES

Our management’s discussion and analysis of our financial condition and results of operations are based on our consolidated financial statements, which were prepared in accordance with accounting principles generally accepted in the United States (“US GAAP”). The preparation of these financial statements requires us to make estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the date of the financial statements as well as the reported net sales and expenses during the reporting periods. On an ongoing basis, we evaluate our estimates and assumptions. We base our estimates on historical experience and on various other factors that we believe are reasonable under the circumstances, the results of which form the basis for making judgments about the carrying value of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates under different assumptions or conditions.

While our significant accounting policies are more fully described in Note 2 to our consolidated financial statements, we believe that the following accounting policies are the most critical to aid you in fully understanding and evaluating this management discussion and analysis.

### Basis of presentation

These accompanying consolidated financial statements were prepared in accordance with US GAAP and pursuant to the rules and regulations of the SEC for annual financial statements.

### Basis of consolidation

The consolidated financial statements include the accounts of CREG and its JV, Sifang Holdings, Shanghai TCH, and Shanghai TCH’s subsidiaries Xi’an TCH, Huaxin and Huahong, and Erdos TCH in which 93% of the investment is from Xi’an TCH. Xi’an TCH, Huaxin and Huahong engage in the same business as Shanghai TCH. Substantially all of the Company’s revenues are derived from the operations of Shanghai TCH and its subsidiaries, which represent substantially all of the Company’s consolidated assets and revenues. All significant inter-company accounts and transactions were eliminated in consolidation.

### Use of estimates

In preparing these consolidated financial statements, management makes estimates and assumptions that affect the reported amounts of assets and liabilities in the balance sheets and revenues and expenses during the year reported. Actual results may differ from these estimates.

### Accounts receivable and concentration of credit risk

Accounts receivable are recorded at the invoiced amounts and do not bear interest. The Company extends unsecured credit to its customers in the ordinary course of business but mitigates the associated risks by performing credit checks and actively pursuing past due accounts. An allowance for doubtful accounts is established and determined based on managements’ assessment of known requirements, aging of receivables, payment history, the customer’s current credit worthiness and the economic environment.

Financial instruments that potentially subject the Company to credit risk primarily are accounts receivable, receivables on sales-type leases and other receivables. The Company does not require collateral or other security to support these receivables. The Company conducts periodic reviews of its clients’ financial condition and customer payment practices to minimize collection risk on accounts receivable.

The operations of the Company are located in the PRC. Accordingly, the Company’s business, financial condition, and results of operations may be influenced by the political, economic, and legal environments in the PRC, as well as by the general state of the PRC economy.

### Property and Equipment

Property and equipment are stated at cost, net of accumulated depreciation. Expenditures for maintenance and repairs are expensed as incurred; additions, renewals and betterments are capitalized. When property and equipment are retired or otherwise disposed of, the related cost and accumulated depreciation are removed from the respective accounts, and any gain or loss is included in operations. Depreciation of property and equipment is provided using the straight-line method over estimated lives as follows:

|  |  |
| --- | --- |
| Building | 20 years |
| Vehicle | 2 - 5 years |
| Office and Other Equipment | 2 - 5 years |
| Software | 2 - 3 years |

-33-

### Revenue Recognition

#### Sales-type Leasing and Related Revenue Recognition

The Company constructs and then leases waste energy recycling power generating projects to its customers. The Company usually transfers ownership of the waste energy recycling power generating projects to its customers at the end of each lease. Investment in these projects is recorded as investment in sales-type leases in accordance with Statement of Financial Accounting Standards (“SFAS”) No. 13, “Accounting for Leases” (codified in Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) Topic 840) and its various amendments and interpretations. The Company manufactures and constructs the waste energy recycling power generating projects and finances its customers for the price of the projects. The sales and cost of sales are recognized at the time of sale or inception of the lease. The investment in sales-type leases consists of the sum of the total minimum lease payments receivable less unearned interest income and estimated executory cost. Unearned interest income is amortized to income over the lease term so as to produce a constant periodic rate of return on the net investment in the lease. While a portion of revenue is recognized at the inception of the lease, the cash flow from the sales-type lease occurs over the course of the lease. Revenue is net of Value Added Tax.

#### Contingent Rental Income

The Company records the income from actual electricity usage in addition to minimum lease payment of each project as contingent rental income in the period earned. Contingent rent is not part of minimum lease payments.

#### Operating Leases

During 2008, The Company leased two energy recycling power generation equipment systems which were then subleased to two different parties under one-year, non-cancellable leases with the rents paid in full. The leases and the subleases were not renewed when they expired in April 2009. These transactions were accounted for as operating leases. In an operating lease revenue is recognized as payments are received; the initial direct costs were deferred and amortized over the lease term on a straight-line basis, thus matching them against rental revenue.

### Foreign Currency Translation and Comprehensive Income (Loss)

The Company’s functional currency is the Renminbi (“RMB”). For financial reporting purposes, RMB were translated into United States dollars (“USD”) as the reporting currency. Assets and liabilities are translated at the exchange rate in effect at the balance sheet date. Revenues and expenses are translated at the average rate of exchange prevailing during the reporting period. Translation adjustments arising from the use of different exchange rates from period to period are included as a component of stockholders’ equity as “Accumulated other comprehensive income”. Gains and losses from foreign currency transactions are included in income. There has been no significant fluctuation in exchange rate for the conversion of RMB to USD after the balance sheet date.

The Company uses SFAS 130 “Reporting Comprehensive Income”. Comprehensive income is comprised of net income and all changes to the statements of stockholders’ equity, except those due to investments by stockholders, changes in paid-in capital and distributions to stockholders.

### NEW ACCOUNTING PRONOUNCEMENTS

On July 1, 2009, the Company adopted Accounting Standards Update (“ASU”) No. 2009-01, “Topic 105 - Generally Accepted Accounting Principles - amendments based on Statement of Financial Accounting Standards No. 168, The FASB Accounting Standards Codification and the Hierarchy of Generally Accepted Accounting Principles” (“ASU No. 2009-01”). ASU No. 2009-01 re-defines authoritative GAAP for nongovernmental entities to be only comprised of the FASB Accounting Standards Codification (“Codification”) and, for SEC registrants, guidance issued by the SEC. The Codification is a reorganization and compilation of all then-existing authoritative GAAP for nongovernmental entities, except for guidance issued by the SEC. The Codification is amended to effect non-SEC changes to authoritative GAAP. Adoption of ASU No. 2009-01 only changed the referencing convention of GAAP in Notes to the Consolidated Financial Statements.

On February 25, 2010, the FASB issued ASU No. 2010-09 Subsequent Events Topic 855 “Amendments to Certain Recognition and Disclosure Requirements,” effective immediately. The amendments in the ASU remove the requirement for an SEC filer to disclose a date through which subsequent events have been evaluated in both issued and revised financial statements. Revised financial statements include financial statements revised as a result of either correction of an error or retrospective application of US GAAP. The FASB believes these amendments remove potential conflicts with the SEC’s literature. The adoption of this ASU did not have a material impact on the Company’s consolidated financial statements.

On March 5, 2010, the FASB issued ASU No. 2010-11 Derivatives and Hedging Topic 815 “Scope Exception Related to Embedded Credit Derivatives.” This ASU clarifies the guidance within the derivative literature that exempts certain credit related features from analysis as potential embedded derivatives requiring separate accounting. The ASU specifies that an embedded credit derivative feature related to the transfer of credit risk that is only in the form of subordination of one financial instrument to another is not subject to bifurcation from a host contract under ASC 815-15-25, Derivatives and Hedging — Embedded Derivatives — Recognition. All other embedded credit derivative features should be analyzed to determine whether their economic characteristics and risks are “clearly and closely related” to the economic characteristics and risks of the host contract and whether bifurcation is required. The ASU is effective for the Company on July 1, 2010. Early adoption is permitted. The adoption of this ASU did not have a material impact on the Company’s consolidated financial statements.

In April 2010, the FASB codified the consensus reached in Emerging Issues Task Force Issue No. 08-09, “Milestone Method of Revenue Recognition.” FASB ASU No. 2010-17 provides guidance on defining a milestone and determining when it may be appropriate to apply the milestone method of revenue recognition for research and development transactions. FASB ASU No. 2010-17 is effective for fiscal years beginning on or after June 15, 2010, and is effective on a prospective basis for milestones achieved after the adoption date. The Company does not expect this ASU will have a material impact on its financial position or results of operations when it adopts this update on January 1, 2011.

### RESULTS OF OPERATIONS

### Comparison of Nine Months Ended September 30, 2010 and 2009

The following table sets forth the results of our operations for the periods indicated as a percentage of net sales:

|  | 2010 $% of Sales |  | 2009 $% of Sales |  |
| --- | ---: | ---: | ---: | ---: |
| Sales | $43,783,259 | 100% | $33,885,589 | 100% |
| Sales of products | 42,477,423 | 97% | 27,938,697 | 82% |
| Contingent rental income | 1,305,836 | 3% | - | - |
| Rental income | - | - | 5,946,892 | 18% |
| Cost of sales | (32,763,130) | 75% | (25,645,744) | 76% |
| Cost of products | (32,763,130) | 75% | (21,497,172) | 63% |
| Rental expense | - | - | (4,148,572) | 13% |
| Gross profit | 11,020,129 | 25% | 8,239,845 | 24% |
| Interest income on sales-type lease | 10,371,093 | 24% | 4,117,305 | 12% |
| Total operating income | 21,391,222 | 49% | 12,357,150 | 36% |
| Total operating expenses | (4,542,859) | 10% | (2,730,971) | 8% |
| Income from operations | 16,848,363 | 39% | 9,626,179 | 28% |
| Total non-operating income (expenses), net | (1,780,580) | (4)% | (362,405) | (1)% |
| Income before income tax | 15,067,783 | 35% | 9,263,774 | 27% |
| Income tax expense | 4,250,562 | 10% | 1,166,684 | 3% |
| Less: net income (loss) attributable to noncontrolling interest | (589,819) | (1)% | 10,897 | -% |
| Net income | $10,227,402 | 24% | $8,107,987 | 24% |

*SALES.* Net sales for the nine months ended September 30, 2010 were $43.78 million while our net sales for the comparable period of 2009 were $33.89 million, an increase in revenues of $9.9 million. The increase primarily was due to (1) the completion and sale of the second 9MW capacity power station of Erdos Phase I project through sales-type lease in the first quarter of 2010, which included two 9MW units, the first 9MW capacity power station was completed and sold in December of 2009; (2) the completion of transformation and sale of Pucheng Biomass Power Generation System; (3) the completion of transformation and sale of Zhongbao Waste Heat Power Generation System; and (4) contingent rental income of $1.31 million from actual usage of the electricity in addition to the minimum lease payments from our Shengwei Group - Tongchuan Project, Erdos Project and Shenmu Project. While in the same period of 2009, we recorded sales income of $9.51 million from Shengwei Jinyang Heat Power Generation System and $18.42 million from Shenmu Waste Gas Power Generation System through sales-type lease, and rental income of $5.95 million from our operating lease of two power generating systems, which were not renewed when they expired in April 2009. For the sales-type lease, sales (net of VAT) and cost of sales are recorded at the time of leases; the interest income from the sales-type leasing is our other major revenue source in addition to sales revenue.

*COST OF SALES.* Cost of sales for the nine months ended September 30, 2010 was $32.76 million while our cost of sales for the comparable period in 2009 was $25.65 million, an increase of $7.12 million. Our cost of sales consisted of the second 9MW capacity power station of Erdos Phase I project, Pucheng biomass power generation system and Zhongbao WHPG System. For the comparable period of 2009, the cost of sales was for Shengwei Jinyang heat power generation system, Shenmu WGPG system, and the operating lease as we leased two power generating systems under one-year, non-cancellable leases since April of 2008, which we subleased for higher monthly rental income under a one-year, non-cancellable lease.

*GROSS PROFIT*. Gross profit was $11.02 million for the nine months ended September 30, 2010 compared to $8.24 million for the comparable period in 2009, representing a gross margin of 25% and 24% for the nine months ended September 30, 2010 and 2009, respectively. The gross profit was mainly from the selling of the Erdos Phase I second 9MW capacity power station in the first quarter of 2010, Pucheng Biomass power generation system in the second quarter of 2010 and Zhongbao WHPG system in the third quarter of 2010, while in 2009, it was mainly for the selling of Jinyang Shengwei heat power generation system, and Shenmu WGPG system, and the operating lease business in connection with leasing out two energy recycling power generation equipment systems since April of 2008.

*OPERATING INCOME*. Operating income was $21.39 million for the nine months ended September 30, 2010 while our operating income for the comparable period in 2009 was $12.36 million, an increase of $9.03 million. The growth in operating income was mainly due to the increase in interest income from selling and leasing our energy saving systems through sales-type leasing. Interest income on sales-type leasing for the nine months ended September 30, 2010 was $10.37 million, a $6.25 million increase from $4.12 million for the comparable period in 2009. During the nine months ended September 30, 2010, the interest income was derived from eight systems: two TRT systems, two CHPG systems, one WGPG system, two waste heat power generating systems associated with our Erdos Phase I project and the Pucheng biomass power generation system. During the comparable period of 2009, the interest income was derived from our two TRT systems and two CHPG systems.

*OPERATING EXPENSES.* Operating expenses consisted of selling, general and administrative expenses totaling $4.54 million for the nine months ended September 30, 2010 compared to $2.73 million for the comparable period in 2009, an increase of $1.81 million or 66%. The increase was due to proportional increases in our payroll, welfare and marketing expenses as a result of sales of the second 9MW capacity power station of Erdos Phase I project, Pucheng biomass power generation system, Zhongbao WHPG system and continuous expansion of our business; in addition, we recorded $1.92 million compensation expense for stock options and warrants during the nine months ended September 30, 2010, compared to $1.13 million for the same period in 2009. We also recorded $0.60 million stock based compensation resulting from a lawsuit settlement with a consulting firm.

*NON-OPERATING EXPENSES.* Non-operating expenses consisted of non sales-type lease interest income, interest expense, bank charges and some miscellaneous expenses. For the nine months ended September 30, 2010, net non-operating expenses were $1.78 million; compared to the comparable period of 2009, an increase of $1.42 million from $0.36 million, mainly due to the $1.33 million interest expense related to the beneficial conversion feature for the convertible note that was issued April 29, 2008 with the conversion price to be tied to 2009 audited net profit; there was no similar non-operating expense for the comparable period in 2009.

*INCOME TAX EXPENSE.* The income tax expense was $4.25 million for the nine months ended September 30, 2010, an increase of $3.08 million from $1.17 million for the comparable period of 2009. The increase was mainly due to the increase of income before income tax from $9.26 million during the nine months ended September 30, 2009 to $15.07 million in the comparable period of 2010. The consolidated effective income tax rate for 2010 and 2009 was 28.2% and 12.6%, respectively. The change in the consolidated effective tax rate was mainly due to increased taxable income from a permanent non-tax deductible interest expense of $1.33 million resulting from amortization of a beneficial conversion feature for a convertible note, and stock compensation expense of $602,000 resulting from stock issuance price for stock issued to a consulting firm at less than the stock price at grant date; non-tax deductible expenses were added back to taxable income for US income tax return purposes. The income tax rate for Shanghai TCH was 20% and 22% for 2009 and 2010, respectively. Xi’an TCH’s effective income tax rate for 2010 and 2009 is 15% as a result of its high tech enterprise status that was approved by the taxing authority. Xingtai Huaxin’s effective income tax rate for 2010 and 2009 is 25%. Huahong and Erdos TCH’s effective income tax rate for 2010 is 25%.

*NET INCOME.* Our net income for the nine months ended September 30, 2010 was $10.23 million compared to $8.11 million for the comparable period in 2009, an increase of $2.12 million. This increase in net income was mainly due to the sales of the second 9MW capacity power system of Erdos Phase I project, Pucheng 12MW biomass power generation system and Zhongbao 7MW capacity WHPG system, as well as increased interest income from lease payments for energy saving systems compared with comparable period of 2009.

### Comparison of Three Months Ended September 30, 2010 and 2009

The following table sets forth the results of our operations for the periods indicated as a percentage of net sales:

|  | 2010 $% of Sales |  | 2009 $% of Sales |  |
| --- | ---: | ---: | ---: | ---: |
| Sales | $11,119,312 | 100% | $18,425,620 | 100% |
| Sales of products | 10,556,114 | 95% | 18,425,620 | 100% |
| Contingent rental income | 563,198 | 5% | - | - |
| Rental income | - | - | - | -% |
| Cost of sales | (8,162,970) | 73% | (14,179,421) | 77% |
| Cost of products | (8,162,970) | 73% | (14,179,421) | 77% |
| Rental expense | - | - | - | 0% |
| Gross profit | 2,956,342 | 27% | 4,246,199 | 23% |
| Interest income on sales-type lease | 3,952,830 | 35% | 1,783,833 | 10% |
| Total operating income | 6,909,172 | 62% | 6,030,032 | 33% |
| Total operating expenses | (1,796,686) | 16% | (1,375,230) | 7% |
| Income from operations | 5,112,486 | 46% | 4,654,802 | 26% |
| Total non-operating income (expenses), net | (609,997) | (5)% | 76,516 | (0)% |
| Income before income tax | 4,502,489 | 41% | 4,731,318 | 26% |
| Income tax expense (benefit) | 1,352,519 | 12% | (941,962) | (5)% |
| Less: net income (loss) attributable to noncontrolling interest | (103,246) | (1)% | 7,739 | -% |
| Net income | $3,046,724 | 28% | $3,797,095 | 21% |

*SALES.* Net sales for the three months ended September 30, 2010 were $11.12 million while our net sales for the three months ended September 30, 2009 were $18.43 million, a decrease in revenues of $7.31 million. The sales in the third quarter of 2010 primarily was attributed to the sales of Zhongbao WHPG system and contingent rental income of $0.56 million from actual usage of electricity generated in addition to the minimum lease payments from our Shengwei Group-Tongchuan Project, Erdos Project and Shenmu Project, compared to the comparable period of 2009 in which sales for the Shenmu WGPG system occurred. We recorded sales of the Zhongbao WHPG system of $10.56 million, compared to the comparable period in 2009, when we recorded $18.43 million for Shenmu WGPG system. Sales (net of VAT) and cost of sales is recorded at the time of the leases; the interest income from the sales-type leases is our other major revenue source in addition to sales revenue.

*COST OF SALES.* Cost of sales for the three months ended September 30, 2010 was $8.16 million while our cost of sales for the comparable period in 2009 was $14.18 million, a decrease of $6.02 million. Our cost of sales for the third quarter of 2010 was for a sales-type lease of Zhongbao WHPG system with a cost of $8.16 million. In the comparable period of 2009, the cost of sales consisted of the cost of Shenmu WGPG system with a cost of $14.18 million.

*GROSS PROFIT*. Gross profit was $2.96 million for the three months ended September 30, 2010 as compared to $4.25 million for the comparable period in 2009, representing a gross margin of 27% and 23% for the third quarters of 2010 and 2009, respectively. The increase in gross profit as a percentage was mainly from the profit of the sales-type leases of Zhongbao WHPG system with a gross profit margin of about 23% and the contingent rental income which increased average profit margin by 4%, while in the comparable period of 2009, the gross profit was from the sales type lease of Shenmu WGPG system with a profit margin of 23%.

*OPERATING INCOME*. Operating income was $6.91 million for the three months ended September 30, 2010 while our operating income for the comparable period in 2009 was $6.03 million, an increase of $0.88 million. The growth in operating income was mainly due to the sales of the Zhongbao WHPG system, and increase in interest income from the sales-type lease systems, which were from two TRT systems, two CHPG systems, one WGPG system, one biomass power generation system, and two waste heat power generating systems associated with our Erdos Phase I project. The interest income for the three months ended September 30, 2010 was $3.95 million, compared to interest income of $1.78 million in the comparable period of 2009, an increase $2.17 million; the interest income was from two TRT and two CHPG systems only in the three months ending September 30, 2009.

*OPERATING EXPENSES.* Operating expenses consisted of selling, general and administrative expenses totaling $1.80 million for the three months ended September 30, 2010 as compared to $1.38 million for the comparable period in 2009, an increase of $0.42 million or 31%. This increase was mainly due to proportional increases in our payroll, welfare and marketing expenses as a result of our increased sales and expansion of our business; in addition, we recorded $0.51 million compensation expenses for stock options and warrants during the three months ended September 30, 2010, compared to $0.69 million for the comparable period in 2009. We also recorded $0.60 million stock compensation cost resulting from settlement of a lawsuit with a consulting firm during the three months ended September 30, 2010.

*NON-OPERATING EXPENSES.* Non-operating expenses consisted of non sales-type lease interest income, interest expense, bank charges and some miscellaneous expenses. For the three months ended September 30, 2010, the net of non-operating expenses was $0.61 million; compared to the comparable period of 2009, this was an increase of $0.69 million from the net of non-operating income of $76,516 during the three months ended September 30, 2009, mainly due to the $0.45 million interest expense related to the beneficial conversion feature for the convertible note that was issued April 29, 2008 with the conversion price to be tied to 2009 audited net profit, while there was no similar non-operating expense for the comparable period in 2009.

*INCOME TAX EXPENSE.* The income tax expense was $1.35 million for the three months ended September 30, 2010, an increase of $0.41 million compared to $0.94 million for the comparable period of 2009. The increase was mainly due to the increase of income before income tax from $5.50 million during three months ended September 30, 2009 to $6.47 million during the comparable period of 2010. The income tax rate for Shanghai TCH was 20% and 22% for 2009 and 2010, respectively. Xi’an TCH’s effective income tax rate for 2010 and 2009 is 15% as a result of its high tech enterprise status that was approved by the taxing authority. Xingtai Huaxin’s effective income tax rate for 2010 and 2009 is 25%. Huahong and Erdos TCH’s effective income tax rate for 2010 is 25%.

*NET INCOME.* Our net income for the three months ended September 30, 2010 was $3.05 million as compared to $3.80 million for the comparable period in 2009, a decrease of $0.75 million. This decrease in net income was mainly due to sale of the Zhongbao WHPG system at $10.56 million in the third quarter of 2010, while in the comparable period of 2009, the sale of the Shenmu WGPG system was at $18.43 million. Besides the sales of product, there was an increase in the interest income from sales-type leases of one CHPG system, one WGPG system, one biomass power generation systems and two waste heat power generating systems in the third quarter of 2010, as compared to the third quarter of 2009.

### LIQUIDITY AND CAPITAL RESOURCES

### Comparison of Nine Months Ended September 30, 2010 and 2009

As of September 30, 2010, the Company had cash and cash equivalents of $6.49 million, other current assets were $11.92 million and current liabilities were $25.91 million. Working capital was negative $7.50 million. The debt-to-equity ratio was 0.79:1 at September 30, 2010.

The following is a summary of cash provided by or used in each of the indicated types of activities during nine months ended September 30, 2010 and 2009:

| Cash provided by (used in): | 2010 | 2009 |
| --- | ---: | ---: |
| Operating Activities | $13,464,246 | $4,131,785 |
| Investing Activities | (28,290,195) | (13,909,272) |
| Financing Activities | 20,213,268 | 8,190,797 |

Net cash flow provided by operating activities was $13.46 million during the nine months ended September 30, 2010, as compared to $4.13 million provided in the comparable period of 2009. The increase in net cash inflow was mainly due to the increase in net income, as well as increase in accounts payable outstanding despite the payment of $10 million for construction in progress of Erdos Phase II and III projects, which was consider as an operating activity due to the similar nature of producing an inventory for sale.

Net cash flow used in investing activities was $28.29 million during the nine months ended September 30, 2010, compared to $13.91 million used in the comparable period of 2009. The increase of net cash flow used in investing activities during the nine months ended September 30, 2010 was mainly due to increases in our initial investment in sales type leases of $30.72 million, which consisted of $9.73 million for the second 9MW capacity power station of Erdos Phase-I recycling waste heat power generating system, $10.27 million for the Biomass Power Generation system of Pucheng and $10.47 million for the Zhongbao WHPG system, as well as an increase in restricted cash of $0.75 million to the bank as collateral for bank acceptances.

Net cash flow provided by financing activities was $20.21 million for the nine months ended September 30, 2010 compared to net cash provided by financing activities of $8.19 million for the comparable period in 2009. The increase was mainly due to the proceeds from a long term bank loan of $4.41 million and the second expansion of the Erdos trust plan of $11.39 million, the advance of $0.81 million from the minority shareholder of Erdos TCH for paying certain operating expenses of Erdos project, $2.64 million advance from one shareholder for company’s working capital needs, and $0.91 million capital contribution by the minority shareholder of Erdos TCH.

We believe we have sufficient cash to continue our current business through September 2011 due to stable recurring receipts from interest income from sales type leases in place. As of September 30, 2010, we have two TRT systems, two CHPG systems, one WGPG system, two recycling waste heat power generating systems and one BMPG, currently generating net cash inflow. In addition, we may have access to a revolving line of credit and other forms of bank loans in case of instant need for working capital. We believe we have sufficient cash resources to cover our anticipated capital expenditures in 2010.

We do not believe inflation has had a significant negative impact on our results of operations during 2010.

### Off-Balance Sheet Arrangements

We have not entered into any other financial guarantees or other commitments to guarantee the payment obligations of any third parties. We have not entered into any derivative contracts that are indexed to our shares and classified as stockholder’s equity or that are not reflected in our consolidated financial statements. Furthermore, we do not have any retained or contingent interest in assets transferred to an unconsolidated entity that serves as credit, liquidity or market risk support to such entity. We do not have any variable interest in any unconsolidated entity that provides financing, liquidity, market risk or credit support to us or engages in leasing, hedging or research and development services with us.

### Contractual Obligations

#### Convertible Notes Payable

On April 29, 2008, we issued and sold to Carlyle Asia Growth Partners III, L.P. and CAGP III Co-Investment, L.P. a 5% Secured Convertible Promissory Note of $5,000,000. The terms for the Note were amended and restated on April 29, 2009.

This note bears interest at 5% and matures on April 29, 2011. The principal amount of the note, together with any interest thereon, convert, at the option of the holders at any time on or after March 16, 2010 and prior to maturity, into shares of the Company’s common stock at an initial conversion price tied to the after-tax net profits of the Company for the fiscal year ending December 31, 2009. Based on our after-tax profits in 2009, the initial conversion price is $1.29 per share, and this note was convertible in full into 3,875,969 shares of our common stock as of September 30, 2010. The obligation of the Company under this note is ranked senior to all other debt of the Company. The note is secured by a security interest granted to the investors pursuant to a share pledge agreement.

On April 29, 2009, we issued an 8% Secured Convertible Promissory Note of $3 million to Carlyle Asia Growth Partners III, L.P. with maturity on April 29, 2012. The note holder has the right to convert all or any part of the aggregate outstanding principal amount of this note, together with interest, if any, into shares of our common stock, at any time on or after March 16, 2010 and prior to the maturity date (or such later date on which this note is paid in full), at a conversion price per share of common stock equal to US $0.80, and this note was convertible in full into 3,750,000 shares of our common stock as of September 30, 2010. These shares rank pari-passu with those issuable under the 5% Secured Convertible Promissory Note.

#### Notes Payable – Bank Acceptances

We had notes payable for bank acceptances of $3.0 million at September 30, 2010, which were collateralized by depositing cash in the bank as restricted cash. We endorsed the bank acceptances to vendors as payment of our obligations. Most of the bank acceptances have a maturity of less than six months.

#### Loan Payable – Collective Capital Trust Plan

On December 3, 2009, Beijing International Trust Co., Ltd. (“Beijing Trust”) formed a Low Carbon Fortune-Energy Recycling No. 1 Collective Capital Trust Plan (“Plan”), pursuant to the Capital Trust Loan Agreement entered into by Erdos TCH Energy Saving Development Co., Ltd and Beijing Trust dated November 19, 2009. Under the Plan, Beijing Trust raised RMB 181,880,000 ($26.75 million) through the sale of 181,880,000 total trust units at RMB 1 per unit. All amounts raised under the Plan are loaned to Erdos TCH in connection with the construction and operation of Phases II and III of the Erdos Power Generation Projects. These projects, when completed, will recycle waste heat from Erdos Metallurgy’s metal refining plants to generate electric power and steam, which will then be sold back to Erdos Metallurgy.

The Plan included 145,500,000 category A preferred trust units ($21.4 million), consisting of 12,450,000 category A1 preferred trust units ($1.8 million), 15,000,000 category A2 preferred trust units ($2.2 million), 118,050,000 category A3 preferred trust units ($17.4 million); and 36,380,000 category B secondary trust units ($5.35 million), consisting of 9,100,000 category B1 secondary trust units ($1.34 million) and 27,280,000 category B2 secondary trust units ($4.01 million). The B1 units were purchased by members of management of Erdos TCH and the B2 units were purchased by Xi’an TCH. Under the Agreement, the annual base interest rate is 9.94% for A1 preferred trust fund units with a term of two years, 11% for A2 preferred trust fund units with a term of three years, 12.05% for A3 preferred trust fund units and 8.35% for the category B secondary trust fund units, each with a term of four years.

Erdos TCH gave a lien on its equipment, assets and accounts receivable to guarantee the loans under the Agreement. Xi’an TCH and Mr. Guohua Ku, our CEO, also gave unconditional and irrevocable joint liability guarantees to Beijing Trust for Erdos TCH’s performance under the Agreement. Erdos (the minority stockholder and customer of Erdos TCH) provided a commitment letter on minimum power purchase from Erdos TCH.

On December 18, 2009, an additional RMB 25,000,000 ($3.68 million) was raised by Beijing Trust to support the Company’s Erdos Power Generation Projects. Beijing Trust sold 25,000,000 trust units at RMB 1 per unit which included 20,000,000 category A1 preferred trust units ($ 2.94 million) and 5,000,000 category B2 secondary trust units ($ 0.74 million). The B2 units were purchased by Xi’an TCH.

In December 2009, the Company sold 206,880,000 units for RMB 206,880,000 ($30.30 million), of which 9,100,000 units ($1.33 million) were purchased by the management of Erdos TCH; 32,280,000 units ($4.73 million) were purchased by Xi’an TCH; the amount of $4.73 million was considered as investment by Xi’an TCH into Erdos TCH and, accordingly, was eliminated in the Company’s consolidated financial statements. The net long term loan payable under this trust plan was $25.58 million at December 31, 2009. Interest expense accrued on this trust loan was $0 at December 31, 2009.

On April 15, 2010, Beijing Trust completed the second expansion of the Plan. The second expansion of the Plan raised RMB 93,120,000 ($13.69 million) through the sale of 93,120,000 trust units at RMB 1 per unit. All amounts raised under the Second Expansion of the Plan are to be loaned to Erdos TCH. The second expansion of the Plan includes 2,800,000 category A1 preferred trust units ($0.41 million), 5,000,000 category A2 preferred trust units ($0.73 million), 66,700,000 category A3 preferred trust units ($9.81 million) and 4,650,000 category B1 preferred trust units ($0.68 million) and 13,970,000 category B2 secondary trust units ($2.05 million). The B1 units were purchased by members of management of Erdos TCH and the B2 units have been purchased by Xi’an TCH. With the completion of the second expansion of the Plan, the Low Carbon Fortune-Energy Recycling No. 1 Collective Capital Trust Plan has reached RMB 300,000,000 ($44.12 million) and completed its entire trust plan fund raising work. The net long term loan payable under this trust plan was $37.13 million at September 30, 2010. Interest expense accrued on this trust loan was $2.51 million at September 30, 2010.

In addition to the above, under the Loan Agreement, Erdos TCH must pay a management incentive benefit to Beijing Trust upon maturity of the category A3 and category B trust units in December 2013 if the ratio of Erdos TCH’s profit to its registered capital exceeds a base amount. If this criterion is met, the amount of the management incentive benefit is calculated based on a formula tied to Erdos TCH’s net profit and the average registered capital for the 2012 fiscal year. Under this formula the management incentive benefit could range between 0% and 100% of the net profit of Erdos TCH in the 2012 fiscal year.

The management incentive benefit was structured to provide an incentive to management to make the joint venture profitable. Under the Plan, Beijing Trust will distribute the entire amount of the management incentive benefit it receives to the holders of the category B trust units. As previously disclosed, the holders of the category B trust units are the management of Erdos TCH and Xi’an TCH. Category B trust units receive a lower base interest rate than the category A trust units but the economic return to the holders of category B trust units will be enhanced by any management incentive benefit.

Erdos TCH also agrees to share the benefits from Clean Development Mechanism ("CDM") under the Kyoto Protocol equally with Beijing Trust during the term of the loan. Any benefit received from CDM will be paid to Erdos Metallurgy first. Under the agreement with Xi’an TCH, Erdos Metallurgy agrees to deliver to Xi’an TCH 50% of the benefit Erdos Metallurgy receives. Xi’an TCH agrees to share 50% of the benefit it receives from Erdos Metallurgy with Erdos TCH. Under the Capital Trust Loan Agreement between Erdos TCH and Beijing Trust, Erdos TCH agrees that 50% of any benefit it receives will be delivered to Beijing Trust. Pursuant to the Plan, Beijing Trust will distribute 70% of the CDM benefit it receives to the holders of the category B trust units. The receipt of any CDM benefit is subject to a process of evaluation and certification of the project by the CDM Executive Board and is under the guidance of the Conference of the Parties of the United Nations Framework Convention on Climate Change. The first stages of the certification process have been completed successfully.

#### Bank Long Term Loan

The Company entered a loan agreement with Industrial Bank Co., Ltd., Xi’an Branch (the “Lender”) for a loan designed for energy saving and emission reduction projects, whereby the Lender agreed to loan RMB 30,000,000 ($4,411,700) to Xi’an TCH for three years from April 6, 2010 to April 6, 2013. The proceeds of the loan are required to be used in payment for equipment for Xi’an TCH’s energy saving and emission reduction projects. The Loan Agreement has a floating interest rate that resets at the beginning of each quarter at 110% of the national base interest rate for the same term and same level loan (currently 5.4%). Under the loan, Xi’an TCH is required to make quarterly interest payments and, beginning six months after the date of the release of the funds, to make minimum quarterly principal payments of RMB 3,000,000 (approximately $441,800) each quarter. The Loan Agreement contains standard representations, warranties and covenants, and the loan is guaranteed by Xi’an TCH, Shaanxi Shengwei Construction Material Group and Mr. Guohua Ku.

#### Revolving Financing Agreement

On October 26, 2009, Xi’an TCH and Erdos TCH entered into a one-year Non Promissory Short Term Revolving Financing Agreement (the “Citi Agreement”), dated and effective from October 12, 2009, with Citi Bank (China) Co., Ltd., Shanghai Branch (“Citi”). The maximum financing provided in the Citi Agreement is RMB 20 million ($2.9 million). The Citi Agreement allows for Xi’an TCH and Erdos TCH to borrow money to maintain current liquidity for notes receivable, such as trade notes payable to the Company, or in order to capitalize on discounts for early payment of accounts payable, such as for equipment or raw materials. The maximum maturity date for each financing is six months. The interest rate for any note discount financing will be determined by the relevant note discount documents and the interest rate for accounts payable financing will be determined by the relevant accounts payable documents.

The proceeds received under the financing arrangement are to be used for working capital and to purchase raw materials. The amounts received pursuant to the Citi Agreement are secured by an account maintained by the Company with Citi, accounts receivable of Xi’an TCH and Erdos TCH and the guarantees of Shanghai TCH and Guohua Ku, our Chairman of the Board and Chief Executive Officer.

Xi’an TCH and Erdos TCH agreed not to use the loan to pay for related party transactions without Citi’s permission. Xi’an TCH and Erdos TCH also agreed to deposit their income from sales of products and services into their accounts with Citi with a combined average monthly income amount of no less than RMB 5 million ($0.73 million). Xi’an TCH and Erdos TCH may not draw on the Citi Agreement until the monthly income amount reaches 80% of expected income amount, as set forth in the Citi Agreement for that month. Each loan of Xi’an TCH and Erdos TCH should be no more than 35% of the maximum financing limit. If the single monthly income amount for Xi’an TCH and Erdos TCH is less than 70% of the expected income amount of that month, Citi has the right to suspend, cancel or terminate the financing and accelerate the maturity date of any outstanding amount and request immediate reimbursement. As of September 30, 2010, Xi’an TCH and Erdos TCH had no amounts outstanding under the Citi Agreement. The Citi Agreement expired by its terms in October 2010.

#### Commitments

### Erdos Phase II and III of Power Generation Projects

In April 2009, Erdos TCH signed a contract with Erdos Metallurgy to recycle heat from groups of furnaces of Erdos Metallurgy’s metal refining plants to generate power and steam, to be sold back to Erdos Metallurgy. According to the contract, Erdos TCH will install a group of power generation projects with a total of 70MW power capacity, which may expand up to 120MW, and 30-ton steam per hour, with an estimated total investment in excess of $74 million (RMB 500 million). The Company split the construction of the projects into three phases, two systems of power generation in Phase I with a total of 18MW power capacity, three systems in Phase II with a total of 27MW power capacity and one system in Phase III with 25MW power capacity. For each phase of the project, the lease term is 20 years starting from the date of completion of the phase. During the lease term, Erdos TCH will be responsible for operating the projects and charge Erdos Metallurgy for supply of electricity and steam. Erdos Metallurgy agreed to pay a fixed minimum of $0.22 million (RMB 1.5 million) per month for each 9MW capacity power generation system. Effective January 1, 2010, Erdos TCH outsourced to an independent third party the operation and maintenance of the first 9MW power generation project for $ 922,000 (RMB 6.27 million) per year. After 20 years, each system will be transferred to Erdos without any charge.

During the first quarter of 2010, Erdos power generation system Phase I project was completed and put into operation. Effective April 1, 2010, Erdos TCH outsourced to an independent third party the operation and maintenance of the second 9MW power generation project for $ 922,000 (RMB 6.27 million) per year.

As of September 30, 2010 the projects of Erdos Phase II and Phase III are under construction. At September 30, 2010, the Company had paid $45.91 million for Phase II and Phase III. The Company currently expects to complete Phase II in 2010 and Phase III in the first quarter of 2011.

## Controls and procedures

As filed, 2,763 characters.

### Evaluation of disclosure controls and procedures

We evaluated the effectiveness of the design and operation of our “disclosure controls and procedures” as defined in Rule 13a-15(e) under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) as of the end of the period covered by this report. This evaluation (the “disclosure controls evaluation”) was done under the supervision and with the participation of management, including our chief executive officer (“CEO”) and chief financial officer (“CFO”). Rules adopted by the SEC require that in this section of our Quarterly Report on Form 10-Q we present the conclusions of the CEO and the CFO about the effectiveness of our disclosure controls and procedures as of the end of the period covered by this report based on the disclosure controls evaluation.

This quarterly report does not include an attestation report of our registered public accounting firm regarding internal control over financial reporting. Management’s report was not subject to attestation by our registered public accounting firm pursuant to temporary rules of the SEC that permit us to provide only management’s report in this quarterly report.

### Objective of Controls

Our disclosure controls and procedures are designed so that information required to be disclosed in our reports filed or submitted under the Exchange Act, such as this Quarterly Report on Form 10-Q, is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms. Our disclosure controls and procedures are also intended to ensure that such information is accumulated and communicated to our management, including the CEO and CFO, as appropriate to allow timely decisions regarding disclosure controls and procedures, including the possibility of human error and the circumvention or overriding of the controls and procedures. Accordingly, even effective disclosure controls and procedures can only provide reasonable assurance of achieving their control objectives, and management necessarily is required to use its judgment in evaluating the cost-benefit relationship of possible disclosure controls and procedures.

### Conclusion

Based upon the disclosure controls evaluation, our CEO and CFO have concluded that as of the end of the period covered by this report, our disclosure controls and procedures were effective to provide reasonable assurance that the foregoing objectives have been achieved.

### Changes in Internal Control Over Financial Reporting

There has been no change in our internal control over financial reporting during the quarter ended September 30, 2010 that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 178 characters.

There have been no material changes in our risk factors from those disclosed in Part I, Item 1A, of our Annual Report on Form 10-K as of and for the year ended December 31, 2009.

Filed Nov 15, 2010.
Source: SEC EDGAR, the filing index for accession 0001144204-10-060102. Last ingested by Listed: Oct 24, 2026, 14:55 ET. No prices; not investment advice.