# Smart Powerr Corp.: Form 10-Q for the period ended Jun 30, 2011

- Company: [Smart Powerr Corp.](/companies/creg.md) (CIK 721693)
- Form: 10-Q
- Filed: 2011-08-15
- Accepted by EDGAR: Aug 15, 2011, 16:03 ET
- Period: 2011-06-30
- Accession: 0001144204-11-046740
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/721693/000114420411046740/v231374_10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/721693/000114420411046740/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2011-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2011-04-01 to 2011-06-30 | $365.7k | us-gaap:Revenues |
| Revenue | 6 months, 2011-01-01 to 2011-06-30 | $11.9m | us-gaap:Revenues |
| Cost of revenue | 3 months, 2011-04-01 to 2011-06-30 | $68.6k | us-gaap:CostOfRevenue |
| Cost of revenue | 6 months, 2011-01-01 to 2011-06-30 | $8.5m | us-gaap:CostOfRevenue |
| Gross profit | 3 months, 2011-04-01 to 2011-06-30 | $297.0k | us-gaap:GrossProfit |
| Gross profit | 6 months, 2011-01-01 to 2011-06-30 | $3.4m | us-gaap:GrossProfit |
| Operating income | 3 months, 2011-04-01 to 2011-06-30 | $4.1m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2011-01-01 to 2011-06-30 | $10.6m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2011-04-01 to 2011-06-30 | $3.1m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2011-01-01 to 2011-06-30 | $5.6m | us-gaap:InterestExpense |
| Income tax | 3 months, 2011-04-01 to 2011-06-30 | $783.7k | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2011-01-01 to 2011-06-30 | $2.2m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2011-04-01 to 2011-06-30 | $3.7m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2011-01-01 to 2011-06-30 | $8.3m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2011-04-01 to 2011-06-30 | $0.07 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2011-01-01 to 2011-06-30 | $0.16 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2011-04-01 to 2011-06-30 | $0.09 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2011-01-01 to 2011-06-30 | $0.20 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2011-04-01 to 2011-06-30 | 55,447,423 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2011-01-01 to 2011-06-30 | 55,084,616 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2011-01-01 to 2011-06-30 | −$10.9m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months, 2011-01-01 to 2011-06-30 | $4.1k | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2011-06-30 | $10.6m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2011-06-30 | $23.1m | us-gaap:AssetsCurrent |
| Total assets | at 2011-06-30 | $184.8m | us-gaap:Assets |
| Current liabilities | at 2011-06-30 | $23.9m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2011-06-30 | $97.0m | us-gaap:Liabilities |
| Shareholders' equity | at 2011-06-30 | $83.6m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 77,040 characters.

### Note Regarding Forward-Looking Statements

*This quarterly report on Form 10-Q and other reports filed by the Company from time to time with the SEC (collectively the “Filings”) contain or may contain forward-looking statements and information that are based upon beliefs of, and information currently available to, Company’s management as well as estimates and assumptions made by Company’s management. Readers are cautioned not to place undue reliance on these forward-looking statements, which are only predictions and speak only as of the date hereof. When used in the filings, the words “anticipate”, “believe”, “estimate”, “expect”, “future”, “intend”, “plan”, or the negative of these terms and similar expressions as they relate to Company or Company’s management identify forward-looking statements. Such statements reflect the current view of Company with respect to future events and are subject to risks, uncertainties, assumptions, and other factors (including the statements in the section “results of operations” below), and any businesses that Company may acquire. Should one or more of these risks or uncertainties materialize, or should the underlying assumptions prove incorrect, actual results may differ significantly from those anticipated, believed, estimated, expected, intended, or planned.*

*Although the Company believes that the expectations reflected in the forward-looking statements are based on reasonable assumptions, the Company cannot guarantee future results, levels of activity, performance, or achievements. Except as required by applicable law, including the securities laws of the United States, the Company does not intend to update any of the forward-looking statements to conform these statements to actual results. Readers are urged to carefully review and consider the various disclosures made throughout the entirety of this report, which attempts to advise interested parties of the risks and factors that may affect our business, financial condition, results of operations, and prospects.*

*Our financial statements are prepared in US Dollars and in accordance with accounting principles generally accepted in the United States. See “Foreign Currency Translation and Comprehensive Income (Loss)” below for information concerning the exchange rates at which Renminbi (“RMB”) were translated into US Dollars (“USD”) at various pertinent dates and for pertinent periods.*

### OVERVIEW OF BUSINESS BACKGROUND

China Recycling Energy Corporation (the “Company” or “CREG”) (formerly China Digital Wireless, Inc.) was incorporated on May 8, 1980, under the laws of the State of Colorado. On September 6, 2001, the Company re-domiciled its state of incorporation from Colorado to Nevada. The Company, through its subsidiary Shanghai TCH Energy Technology Co., Ltd. (“Shanghai TCH”), is in the business of selling and leasing energy saving systems and equipment. On March 8, 2007, the Company changed its name to “China Recycling Energy Corporation”.

In September 2001, Boulder Brewing changed its state of incorporation from Colorado to Nevada and its name to Boulder Acquisitions, Inc., or Boulder Acquisitions. From the date of reincorporation until June 23, 2004, Boulder Acquisitions had no material operations or assets.

On June 23, 2004, we completed a stock exchange transaction with the stockholders of Sifang Holdings Co., Ltd. (“Sifang Holdings”). The exchange was consummated under Nevada and Cayman Islands law pursuant to the terms of a Securities Exchange Agreement, dated June 23, 2004 by and among Boulder Acquisitions, Sifang Holdings and the stockholders of Sifang Holdings. Pursuant to the Securities Exchange Agreement, we issued 13,782,636 shares of our common stock to the stockholders of Sifang Holdings, approximately 89.7% of our post-exchange issued and outstanding common stock, for 100% of the outstanding capital stock of Sifang Holdings.

Effective August 6, 2004, we changed our name from Boulder Acquisitions, Inc. to China Digital Wireless, Inc. From August 2004 to December 2006, we primarily engaged in pager and mobile phone distribution and provided value added information services to the customers in the People’s Republic of China (“PRC”). We phased out and scaled down most of the business of mobile phone distribution and provision of pager and mobile phone value-added information services, and on May 10, 2007, the Company approved and announced that it ceased and discontinued these businesses.

In December 2006, we began to conduct business in the energy saving and recycling industry, including purchasing certain equipment, devices, hardware and software for the construction and installation of TRT systems and other renewable energy products. TRT is an electricity generating system that utilizes the exhaust pressure and heat produced in the blast furnace of steel mills to generate electricity. It has commercial value for the steel mills by using waste heat and steam to produce electricity for the operation of the mills

Our current business is primarily conducted through our wholly-owned subsidiary, Sifang Holdings, its wholly-owned subsidiaries, Huahong New Energy Technology Co., Ltd. (“Huahong”) and Shanghai TCH, Shanghai TCH’s wholly-owned subsidiaries, Xi’an TCH Energy Technology Company, Ltd (“Xi’an TCH”) and Xingtai Huaxin Energy Tech Co., Ltd. (“Huaxin”), and Xi’an TCH’s subsidiary Erdos TCH Energy Saving Development Co., Ltd (“Erdos TCH”), in which 93% of the investment is from Xi’an TCH, a joint venture between Xi’an TCH and Erdos Metallurgy Co., Ltd. Shanghai TCH was established as a foreign investment enterprise in Shanghai under the laws of the PRC on May 25, 2004, currently with registered capital of $29.80 million. Xi’an TCH was incorporated in Xi’an, Shannxi Province under the laws of the PRC on November 8, 2007. Huaxin was incorporated in Xingtai, PRC in November 2007. Erdos TCH was incorporated in April 2009. Huahong was incorporated in February 2009.

On April 8, 2007, our Board of Directors approved and made effective a TRT Project Joint-Operation Agreement (“Joint-Operation Agreement”) which was conditionally entered into on February 1, 2007 between Shanghai TCH and Xi’an Yingfeng Science and Technology Co., Ltd. (“Yingfeng”). Yingfeng is a Chinese company located in Xi’an, Shaanxi Province, China, which designs, sells, installs, and operates TRT systems and other renewable energy products. Due to Yingfeng’s lack of capital in pursuing this project alone, Yingfeng sought Shanghai TCH’s cooperation. On October 31, 2007, Shanghai TCH entered an asset-transfer agreement with Yingfeng to transfer from Yingfeng to Shanghai TCH all electricity-generating related assets owned by Yingfeng. As a result, the contractual relationships between Shanghai TCH and Yingfeng under the TRT Project Joint-Operation Agreement entered on April 8, 2007 were terminated.

On April 14, 2009, the Company incorporated a joint venture (“JV”) between Xi’an TCH and Erdos Metallurgy Co., Ltd. (“Erdos”) to recycle waste heat from Erdos’ metal refining plants to generate power and steam, which will then be sold back to Erdos. The name of the JV is Inner Mongolia Erdos TCH Energy Saving Development Co., Ltd (“Erdos TCH”) with a term of 20 years. As of December 31, 2010, Erdos contributed 7% of the total investment of the project, and Xi’an TCH contributed 93% of the total investment. Xi’an TCH and Erdos will receive 80% and 20% of the profit from the JV, respectively, until Xi’an TCH has received a complete return on its investment. Xi’an TCH and Erdos will then receive 60% and 40% of the profit from the JV, respectively.

On March 15, 2011, the Company incorporated a new wholly owned subsidiary Pingshan Xi’an Shengda Energy Technology Ltd Co. (“Shengda”). Xi’an TCH contributed cash of $4,559,271(RMB 30,000,000) into Shengda as initial capital. Shengda was set up in order to undertake waste energy recycling projects from a steel and chemical company in Pingshan county as to a Recycling Economy Projects Cooperative Framework Agreement that has been developed by the parties but the final terms for the projects have not been reached and entered, and Shengda is not currently operational.

#### Hebei Xingtai Steel Group Project

On April 8, 2007, our Board of Directors approved and made effective a TRT Project Joint-Operation Agreement (“Joint-Operation Agreement”) which was conditionally entered into on February 1, 2007 between Shanghai TCH and Xi’an Yingfeng Science and Technology Co., Ltd. (“Yingfeng”). Under the Joint-Operation Agreement, Shanghai TCH and Yingfeng jointly pursued a project to design, construct, install and operate two TRT systems for Xingtai Iron and Steel Company, Ltd. (“Xingtai”). Shanghai TCH provided various forms of investments and properties into the project including cash, hardware, software, equipment, major components and devices. In return, Shanghai TCH obtained all the rights, titles, benefits and interests that Yingfeng originally had under the Project Contract, including but not limited to the regular cash payments made by Xingtai and other property rights and interests. On October 31, 2007, Shanghai TCH entered an asset-transfer agreement with Yingfeng to transfer from Yingfeng to Shanghai TCH all electricity-generating related assets owned by Yingfeng. According to the transferred contracts, Shanghai TCH installed and owns two TRT systems and leases them to Xingtai for five years, from January 25, 2007 to January 25, 2012. During the lease, Xingtai will pay Shanghai TCH monthly rent of RMB 0.9 million ($0.13 million) to use the systems. Assuming all amounts due under the lease have been paid, Shanghai TCH will transfer the title of the systems to Xingtai free of charge.

#### Shanxi Zhangzhi Steel Group Project

Under the Joint-Operation Agreement discussed above, Shanghai TCH and Yingfeng also jointly pursued a project contract, which was entered into between Yingfeng and Zhangzhi Iron and Steel Company, Ltd. (“Zhangzhi”) on June 22, 2006, to design, construct, install and operate a TRT system for Zhangzhi Iron. Shanghai TCH provided various forms of investments and properties into the project including cash, hardware, software, equipment, major components and devices. In return, Shanghai TCH obtained all the rights, titles, benefits and interests that Yingfeng originally had under the Project Contract, including but not limited to the regular cash payments made by Xingtai and other property rights and interests. On October 31, 2007, Shanghai TCH acquired this contract as part of its asset-transfer agreement with Yingfeng as discussed above. According to the transferred contracts, Shanghai TCH installed and owns a TRT system and leases it to Zhangzhi for 13 years, from July 25, 2007 to July 25, 2020. During the lease term, Zhangzhi will pay Shanghai TCH a monthly rent of RMB 1.1 million ($0.16 million). After the term is over and all due rents are paid, Shanghai TCH will transfer the title of the system to Zhangzhi free of charge.

#### Shengwei Group – Tongchuan Project

In November 2007, Shanghai TCH signed a cooperative agreement with Shengwei Group to build two sets of 12MW cement low temperature heat power generation systems for Shengwei’s two 2,500-tons-per-day cement manufacturing lines in Jin Yang and for a 5,000-tons-per-day cement manufacturing line in Tong Chuan. At the end of 2008, construction of the cement low temperature heat power generation in Tong Chuan was completed at a cost of $6,191,000 (RMB 43,000,000) and put into operation. Under the original agreement, the ownership of the cement low temperature heat power generation systems would belong to Shengwei from the date the projects were put into service. Shanghai TCH is responsible for the daily maintenance and repair of the projects, and charges Shengwei a monthly electricity fee based on the actual power generated by the projects at 0.4116 RMB per KWH for an operating period of five years with the assurance from Shengwei of a properly functioning 5,000-tons-per-day cement manufacturing line and not less than 7,440 heat hours per year for the electricity generator system. Shengwei Group collateralized the cement manufacturing line in Tong Chuan to guarantee its obligations to provide the minimum electricity income from the power generator system under the agreement during the operating period. At the end of the five-year operating period, Shanghai TCH will have no further obligations under the cooperative agreement. On May 20, 2009, Shanghai TCH entered into a supplementary agreement with Shengwei Group to amend the timing for title transfer to the end of the lease term. In addition, the supplementary agreement provided that Shanghai TCH will charge Shengwei based on actual power usage subject to a minimum of $0.31 million (RMB 2.1 million) per month during the operating period.

#### Shengwei Group – Jinyang Project

On June 29, 2009, construction of the cement low temperature heat power generation system in Jin Yang was completed at a cost of $7,318,000 (RMB 50,000,000) and put into operation. Shanghai TCH charges Shengwei a technical service fee of $336,600 (RMB 2,300,000) monthly for the sixty months of the lease term. Shengwei has the right to purchase the ownership of the cement low temperature heat power generation system for $29,000 (RMB 200,000) at the end of lease term. Shengwei is required to provide assurance of properly functioning 5,000-tons-per-day cement manufacturing lines and not less than 7,440 heat hours per year for the cement low temperature heat power generation. Shengwei Group collateralized the cement manufacturing lines in Jin Yang to guarantee its obligations to provide the minimum electricity income from the waste energy power generator system under the agreement during the operating period. Effective July 1, 2009, Shanghai TCH outsourced the operation and maintenance of the cement low temperature heat power generation systems in Tong Chuan and JinYang to a third party for $732,000 (RMB 5,000,000) per year.

#### Shenmu Project

On September 30, 2009, Xi’an TCH delivered to Shenmu County Jiujiang Trading Co., Ltd. (“Shenmu”) a set of three 6 MW capacity waste gas power generation systems pursuant to a Cooperative Contract on Coke-oven Gas Power Generation Project (including its Supplementary Agreement) and a Gas Supply Contract for Coke-oven Gas Power Generation Project. These contracts are for 10 years and provide Xi’an TCH will recycle coke furnace gas from the coke-oven plant of Shenmu to generate power, which will be supplied back to Shenmu. Shenmu agreed to supply Xi’an TCH the coke-oven gas free of charge. Under the contracts, Shenmu will pay us an annual “energy-saving service fee” of approximately $5.6 million in equal monthly installments for the life of the contracts, as well as such additional amount as may result from the supply of power to Shenmu in excess of 10.8 million kilowatt hours per month. We are responsible for operating the projects and will do so through an unrelated third party. Shenmu guarantees that monthly gas supply will not be less than 21.6 million standard cubic meters. If gas supply is less, Shenmu agrees to pay Xi’an TCH the energy-saving service fee described above for up to 10.8 million kilowatt-hours per month. Xi’an TCH maintains the ownership of the project throughout the term of the contracts, including the already completed investment, design, equipment, construction and installation as well as the operation and maintenance of the project. At the end of the 10-year term, ownership of the projects transfers to Shenmu at no charge. Shenmu gave a lien on its production line to guarantee its performance under the Contracts. Shenmu’s three major stockholders provided an unlimited joint liability guarantee to Xi’an TCH for Shenmu’s performance under the Contracts and the Yulin Huiyuan Group, an independent third party, provides a guarantee to Xi’an TCH for Shenmu’s performance under the Contracts.

#### Erdos Projects

On April 14, 2009, the Company incorporated the JV between Xi’an TCH and Erdos Metallurgy Co., Ltd. (“Erdos”) to recycle waste heat from Erdos' metal refining plants to generate power and steam, which will be sold back to Erdos. The name of the JV is Inner Mongolia Erdos TCH Energy Saving Development Co., Ltd (“Erdos TCH”) with a term of 20 years, and initial registered capital of $2,635,000 (RMB 18,000,000). As of June 30, 2011, total registered capital was increased to $17.55 million (RMB 120 million), of which $16.37 million (RMB 112 million) was contributed by Xi’an TCH and $1.18 million (RMB 8 million) was from Erdos Metallurgy. Total investment for the project is estimated at approximately $76 million (RMB 500 million) with an initial investment of $17.55 million (RMB 120,000,000). Erdos contributed 7% of the total investment of the project, and Xi’an TCH contributed 93% of the total investment. Xi’an TCH and Erdos will receive 80% and 20% of the profit from the JV, respectively, until Xi’an TCH has received a complete return on its investment. Xi’an TCH and Erdos will then receive 60% and 40% of the profit from the JV, respectively. The profits to be distributed will be computed based on Chinese generally accepted accounting principles. The principal difference between US GAAP and Chinese GAAP with regards to the Erdos TCH project is that a sales-type lease under US GAAP is treated as an operating lease under Chinese GAAP. When the term of the JV expires, Xi’an TCH will transfer its equity in the JV to Erdos at no additional cost.

At the end of 2009, Erdos TCH completed the first 9MW power station of Phase I of the project and put it into operation. At the end of March 2010, Erdos TCH completed the construction of Phase I through completion of the second 9MW power station and delivery of it for operation. Phase I includes two 9MW systems for a combined 18MW power capacity. Pursuant to the Co-operation Agreement and the supplement agreements signed between Erdos and Erdos TCH, Erdos shall purchase all the electricity and steam to be generated from the JV’s power generation systems. Erdos TCH leased the two 9 MW systems to Erdos and is responsible for their operation and maintenance. For each phase of the project, the lease term is 20 years starting from the date of completion of the phase. Erdos agreed to pay a fixed minimum of $0.22 million (RMB 1.5 million) per month for each 9MW capacity power generation system. In addition Erdos will pay the actual amount if the actual sale of the electricity generated is more than $0.22 million (RMB 1.5 million) monthly per unit. Effective January 1, 2010 and April 2010 respectively, Erdos TCH outsourced to an independent third party the operation and maintenance of the two 9MW power generation projects for $922,000 (RMB 6.27 million) each per year. After 20 years, the units will be transferred to Erdos without any charge.

During the fourth quarter of 2010, Erdos power generation system Phase II two 9MW capacity electricity power generation systems were completed and put into operation. During the first quarter of 2011, Erdos power generation system Phase II the 3rd 9MW capacity electricity power generation system was completed and put into operation through sales type lease with terms similar to the Phase I project. At June 30, 2011, the Company paid approximately $18.19 million for Phase III of the Erdos TCH power generation system projects. The Company currently expects to complete Phase III in the third quarter of 2011.

#### Biomass Project

On January 20, 2010, Xi’an TCH entered into a Technical Reconstruction Letter of Intent with Xueyi Dong (“Dong”) a natural person with Chinese citizenship for Xi’an TCH reconstructing and transforming a Thermal Power Generation Systems owned by Dong into a 12MW Biomass Power Generation Systems (“Biomass Systems” or “BMPG”) for RMB 15 million ( $2.2 million), of which, RMB 7 million ( $1.03 million) was payable to Dong, and RMB 8 million ( $1.18 million) was payable to one of the Company’s shareholders, who had previously paid that amount to Dong on behalf of the Company.

After the successful transformation of the systems, Xi’an TCH entered into a Biomass Power Generation Asset Transfer Agreement (the “Transfer Agreement”) with Dong on June 29, 2010. Under the Transfer Agreement, Dong transferred the Biomass Systems to Xi’an TCH, and Xi’an TCH will pay Dong RMB 100,000,000 ( $14,705,900) for the systems, including RMB 20,000,000 in cash and RMB 80,000,000 in shares of the Company’s common stock. The stock price will be the same as in the Company’s first public offering, expected to occur later this year or in 2012, but in no circumstance will the stock price be less than $4 per share. The exchange rate between U.S. Dollar and Chinese RMB in connection with the stock issuance is 1:6.8. As of June 30, 2011, the Company paid the cash portion in full; however, the shares to be issued in connection with this transaction, valued at $11.78 million as of June 30, 2011, have not been issued.

As of June 30, 2011, the Company has a contingent gain of $5.8 million which is the difference between the payable to Dong of $11.78 million and the fair value of the 2,945,000 minimum number of shares to be issued based on the June 30, 2011 market price of CREG’s shares.

On June 29, 2010, Xi’an TCH entered into a Biomass Power Generation Project Lease Agreement with PuCheng XinHengYuan Biomass Power Generation Co., Ltd., (“XHY”). Under this lease agreement, Xi’an TCH leased this same set of 12MW biomass power generation systems to XHY at a minimum of RMB 1,900,000 per month ($279,400) for 15 years. The leasing fee will increase proportionately with the biomass generated electricity fee in China during the term of this lease agreement.

#### Zhongbao Project

On September 30, 2010, Xi’an TCH delivered to Zhongbao Binhai Nickel Co., Ltd. (“Zhongbao”) a set of 7 megawatt capacity On September 30, 2010, Xi’an TCH delivered to Zhongbao Binhai Nickel Co., Ltd. (“Zhongbao”) a set of 7 megawatt capacity Waste Heat Power Generation (“WHPG”) systems, which are integral parts of the facilities designed to produce 80,000 tons of nickel-alloy per year according to the recovery and power generation of the waste heat agreement with Zhongbao, an agreement that was transferred from China Zhonggang Binhai Enterprise Ltd. (“Zhonggang”) in July 2009. Zhongbao is a nickel-alloy manufacturing joint venture between Zhonggang and Shanghai Baoshan Steel Group established in June 2009. Total investment in this project was approximately $7.8 million (RMB 55 million). The Contract is for 9 years and provided that Xi’an TCH will recycle waste heat from the nickel-alloy rotary kilns of Zhongbao to generate power and steam, which will be supplied back to Zhongbao, and help to reduce over 20,000 tons of carbon dioxide emissions every year. By the end of the term, the system shall be transferred to Zhongbao at RMB 1. Under the Contracts, Zhongbao will pay the Company a monthly “energy-saving service fee” based on the volume of the electricity and steam generated from the WHPG system in the prior month within the first five days of each month at a pre-agreed price, but no less than the minimum monthly payment of $224,000 (RMB 1.5 million). Zhongbao agrees to supply Xi’an TCH the nickel-alloy rotary kilns gas, water and compressed air free of charge, except salty water at RMB 6.3 per ton. Zhongbao also guarantees to continuously supply not less than 6,800 heat hours per year for the WHPG, or the operating term will be extended accordingly. Xi’an TCH outsourced its operation and maintenance works to a third party for annual payments of RMB 2.4 million ($352,000) for the whole operation period. In addition, Xi’an TCH shall be responsible for applying the Clean Development Mechanism (“CDM”) and the net proceeds from CDM will be distributed between Zhonggang and Xi’an TCH at 60% and 40%, respectively. The CDM work has not commenced as of June 30, 2011.

#### Shannxi Datong Coal Group Power Generation Projects

In February 2011, Xi’an TCH signed a contract with Shannxi Datong Coal Group Steel Ltd Co (Shannxi Datong) to recycle gas and steam from groups of blast-furnaces and converter of Shannxi Datong’s metal refining plants to generate power. According to the contract, the Company will install two 3MW TRT and one 15MW WGPG and two 1MW steam power generation systems, with a total of 23MW power capacity for an estimated total investment of $27.45 million (RMB 180 million). The lease term is 30 years. During the lease term, Shannxi Datong will be responsible for operating the projects and pay service fee to the Company. The service fee is based on an average of 8,000 electricity-generating hours per year and RMB 0.33 per kilowatt hour (“Kwh”) for the first 5 years from the completion of each power generation station. For each of the leases, at the 6th year, 11th year and 21st year thereafter, the rate will be RMB 0.3 Kwh, 0.27 Kwh and 0.25 Kwh, respectively. After 30 years, the units will be transferred to Shannxi Datong without any charge.

#### Shenqiu Yuneng Thermal Power Generation Projects

On May 25, 2011, Xi’an TCH entered into a Letter of Intent with ShenQiu YuNeng Thermal Power Ltd Co., (“ShenQiu”) for Xi’an TCH to reconstruct and transform a Thermal Power Generation System owned by ShenQiu into a 75T/H Biomass Power Generation System for approximately RMB 22.5 million (approximately $3.5 million). The project commenced in June 2011, and is expected to be completed in 90 days. Xi’an TCH will purchase the Biomass System from ShenQiu 10 days after completion of the transformation.

### Related Party Transactions

Erdos TCH sold all power generation stations through sales type leases to Erdos Metallurgy Co., Ltd., the noncontrolling interest. Total sales and interest income for this noncontrolling interest was $11.5 million and $3.25 million for the six months ended June 30, 2011, and $10.1 million and $0.9 million for the same period of 2010; $0.2 million and $1.85 for three months ended June 30, 2011, and $0 and $0.6 million for the same period of 2010, respectively.

### Critical Accounting Policies and Estimates

Our management’s discussion and analysis of our financial condition and results of operations are based on our consolidated financial statements, which were prepared in accordance with accounting principles generally accepted in the United States (“US GAAP”). The preparation of these financial statements requires us to make estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the date of the financial statements as well as the reported net sales and expenses during the reporting periods. On an ongoing basis, we evaluate our estimates and assumptions. We base our estimates on historical experience and on various other factors that we believe are reasonable under the circumstances, the results of which form the basis for making judgments about the carrying value of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates under different assumptions or conditions.

While our significant accounting policies are more fully described in Note 2 to our consolidated financial statements, we believe that the following accounting policies are the most critical to aid you in fully understanding and evaluating this management discussion and analysis.

### Basis of presentation

The accompanying consolidated financial statements were prepared in accordance with US GAAP and pursuant to the rules and regulations of the SEC for annual financial statements.

### Basis of consolidation

The consolidated financial statements include the accounts of CREG and, its subsidiary, Sifang Holdings; Sifang Holdings’ wholly owned subsidiaries, Huahong and Shanghai TCH; Shanghai TCH’s subsidiaries Xi’an TCH and Huaxin; and Xi’an TCH’s subsidiary, Shengda and Erdos TCH, in which 93% of Erdos TCH’s investment is from Xi’an TCH. Substantially all of the Company’s revenues are derived from the operations of Shanghai TCH and its subsidiaries, which represent substantially all of the Company’s consolidated assets and liabilities as of June 30, 2011 and December 31, 2010, respectively. All significant inter-company accounts and transactions were eliminated in the consolidation.

### Use of estimates

In preparing these consolidated financial statements, management makes estimates and assumptions that affect the reported amounts of assets and liabilities in the balance sheets and revenues and expenses during the year reported. Actual results may differ from these estimates.

### Concentration of Credit Risk

Cash includes cash on hand and demand deposits in accounts maintained within China. Balances at financial institutions within China are not covered by insurance. The Company has not experienced any losses in such accounts.

Certain other financial instruments, which subject the Company to concentration of credit risk, consist of accounts and other receivables. The Company does not require collateral or other security to support these receivables. The Company conducts periodic reviews of its customers’ financial condition and customer payment practices to minimize collection risk on accounts receivable.

The operations of the Company are located in the PRC. Accordingly, the Company’s business, financial condition and results of operations may be influenced by the political, economic and legal environments in the PRC, as well as by the general state of the PRC economy.

### Property and equipment

Property and equipment are stated at cost, net of accumulated depreciation. Expenditures for maintenance and repairs are expensed as incurred; additions, renewals and betterments are capitalized. When property and equipment are retired or otherwise disposed of, the related cost and accumulated depreciation are removed from the respective accounts, and any gain or loss is included in operations. Depreciation of property and equipment is provided using the straight-line method over estimated lives as follows:

|  |  |
| --- | --- |
| Building | 20 years |
| Vehicle | 2 - 5 years |
| Office and Other Equipment | 2 - 5 years |
| Software | 2 - 3 years |

### Revenue Recognition

#### Sales-type Leasing and Related Revenue Recognition

The Company constructs and then leases waste energy recycling power generating projects to its customers. The Company usually transfers ownership of the waste energy recycling power generating projects to its customers at the end of each lease. Investment in these projects is recorded as investment in sales-type leases in accordance with Statement of Financial Accounting Standards (“SFAS”) No. 13, “Accounting for Leases” (codified in Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) Topic 840) and its various amendments and interpretations. The Company manufactures and constructs the waste energy recycling power generating projects and finances its customers for the price of the projects. The sales and cost of sales are recognized at the time of sale or inception of the lease. The investment in sales-type leases consists of the sum of the total minimum lease payments receivable less unearned interest income and estimated executory cost. Unearned interest income is amortized to income over the lease term so as to produce a constant periodic rate of return on the net investment in the lease. While a portion of revenue is recognized at the inception of the lease, the cash flow from the sales-type lease occurs over the course of the lease. Revenue is net of Value Added Tax.

#### Contingent Rental Income

The Company records the income from actual electricity usage in addition to minimum lease payment of each project as contingent rental income in the period earned. Contingent rent is not part of minimum lease payments.

### Foreign Currency Translation and Comprehensive Income (Loss)

The Company’s functional currency is the Renminbi (“RMB”). For financial reporting purposes, RMB were translated into United States dollars (“USD”) as the reporting currency. Assets and liabilities are translated at the exchange rate in effect at the balance sheet date. Revenues and expenses are translated at the average rate of exchange prevailing during the reporting period. Translation adjustments arising from the use of different exchange rates from period to period are included as a component of stockholders’ equity as “Accumulated other comprehensive income”. Gains and losses from foreign currency transactions are included in income. There has been no significant fluctuation in exchange rate for the conversion of RMB to USD after the balance sheet date.

The Company uses SFAS 130 “Reporting Comprehensive Income” (codified in FASB ASC Topic 220). Comprehensive income is comprised of net income and all changes to the statements of stockholders’ equity, except those due to investments by stockholders, changes in paid-in capital and distributions to stockholders.

### Recent Accounting Pronouncements

In June 2011, FASB issued ASU 2011-05, Comprehensive Income (ASC Topic 220): Presentation of Comprehensive Income. Under the amendments in this update, an entity has the option to present the total of comprehensive income, the components of net income and the components of other comprehensive income either in a single continuous statement of comprehensive income or in two separate but consecutive statements. Under both options, an entity is required to present each component of net income along with total net income, each component of other comprehensive income along with a total for other comprehensive income and a total amount for comprehensive income. In a single continuous statement, the entity is required to present the components of net income and total net income, the components of other comprehensive income and a total for other comprehensive income, along with the total of comprehensive income in that statement. In the two-statement approach, an entity is required to present components of net income and total net income in the statement of net income. The statement of other comprehensive income should immediately follow the statement of net income and include the components of other comprehensive income and a total for other comprehensive income, along with a total for comprehensive income. In addition, the entity is required to present on the face of the financial statements reclassification adjustments for items that are reclassified from other comprehensive income to net income in the statement(s) where the components of net income and the components of other comprehensive income are presented. The amendments in this update should be applied retrospectively and are effective for fiscal years, and interim periods within those years, beginning after December 15, 2011. The guidance is not expected to have a material impact on our financial position or results of operations.

### RESULTS OF OPERATIONS

### Comparison of Three Months Ended June 30, 2011 and 2010

The following table sets forth the results of our operations for the periods indicated as a percentage of net sales:

|  | 2011 $% of Sales |  | 2010 $% of Sales |  |
| --- | ---: | ---: | ---: | ---: |
| Sales | $365,672 | 100% | $22,538,511 | 100% |
| Sales of products | 72,544 | 20% | 21,795,873 | 97% |
| Contingent rental income | 293,128 | 80% | 742,638 | 3% |
| Cost of sales | (68,640) | 19% | (16,801,915) | 75% |
| Cost of products | (68,640) | 19% | (16,801,915) | 75% |
| Gross profit | 297,032 | 81% | 5,736,596 | 25% |
| Interest income on sales-type lease | 5,488,501 | 1501% | 3,323,695 | 15% |
| Total operating income | 5,785,533 | 1582% | 9,060,291 | 40% |
| Total operating expenses | (1,678,768) | 459% | (1,386,476) | 6% |
| Income from operations | 4,106,765 | 1123% | 7,673,815 | 34% |
| Total non-operating income (expenses), net | 536,097 | 147% | (682,089) | (3)% |
| Income before income tax | 4,642,862 | 1270% | 6,991,726 | 31% |
| Income tax expense | 783,701 | 214% | 1,861,277 | 8% |
| Less: net income attributable to noncontrolling interest | 164,160 | 45% | (92,132) | (0.4)% |
| Net income attributable to China Recycling Energy Corp | $3,695,001 | 1011% | $5,038,317 | 22% |

*SALES.* Net sales of systems for the three months ended June 30, 2011 were $0.37 million while our net sales for the same period of 2010 were $22.54 million, a decrease of $22.17 million. The decrease was primarily due to the fact that there was no sale of system in the second quarter of 2011; in comparison, net sales for the same period in fiscal year 2010 reflected the completion and sale of Pucheng biomass power generation system. For the three months ended June 30, 2011, the Company received contingent rental income of $0.29 million, compared to $0.74 million for the same period in fiscal year 2010. The contingent rental income resulted from actual usage of the electricity in addition to the minimum lease payments received in the second quarter of 2011 from our Shengwei Group - Tongchuan Project, Erdos Project and Shenmu Project. For the sales-type lease, sales and cost of sales are recorded at the time of leases; the interest income from the sales-type leases is our other major revenue source in addition to sales revenue.

*COST OF SALES.* Cost of sales for the second quarter of 2011 was $68,640 while our cost of sales for the comparable period of 2010 was $16.80 million, a decrease of $16.1 million. There was no system completed and sold during the second quarter of 2011, compared to the same period of 2010, when the Company executed the sales-type lease of Pucheng biomass power generation system with a cost of $16.80 million.

*GROSS PROFIT*. Gross profit was $0.3 million for the three months ended June 30, 2011 compared to $5.74 million for the same period of 2010, a gross margin of 81% and 25% for the comparable period of 2011 and 2010, respectively. Because no system was completed and sold during the second quarter of 2011, the gross profit was derived entirely from contingent rental income, while in the second quarter of 2010, it mainly resulted from the sale of the Pucheng biomass power generation system.

*INTEREST INCOME ON SALES TYPE* LEASES. Interest income on sales-type leases for the three months ended June 30, 2011 was $5.49 million, a $2.17 million increase from $3.32 million for the comparable period of 2010. During the second quarter of 2011, interest income was derived from twelve systems: two TRT systems, two CHPG systems, one WGPG system, two waste heat power generating systems associated with our Erdos Phase I project and two systems of Erdos Phase II project, the Pucheng biomass power generation system and Zhongbao WHPG system, and the 3rd 9MW waste heat power generating system of Erdos Phase II project. During the second quarter of 2010, interest income was generated from seven systems: two TRT systems, two CHPG systems, one WGPG system, and two waste heat power generating systems associated with our Erdos Phase I project.

*OPERATING EXPENSES.* Operating expenses consisted of selling, general and administrative expenses totaling $1.68 million for the second quarter of 2011 as compared to $1.39 million for the same period of 2010, an increase of $0.29 million or 21%. The increase was due to proportional increases in our payroll, welfare, business trip and marketing expenses as a result of continuous expansion of our business; in addition, we recorded $0.34 million in compensation expense for stock options during the second quarter of 2011, compared to $0.67 million for the same period of 2010.

*NON-OPERATING INCOME (EXPENSES).* Non-operating expenses consisted of non sales-type lease interest income, interest expense, bank charges and some miscellaneous expenses. For the three months ended June 30, 2011, net non-operating income was $536,097 as compared to net non-operating expense of $682,089 for the comparable period of 2010. In the second quarter of 2011, we had $0.32 million interest expenses on loans, $1.82 million interest expense arising from the beneficial conversion feature of the convertible note from Carlyle and China Cinda, but offset by $3.60 million from changes in fair value of conversion feature liability of the convertible note from China Cinda; while in the same period of 2010, the interest expense was $0.44 million arising from beneficial conversion feature for the convertible note.

*INCOME TAX EXPENSE.* The income tax expense was $0.78 million for the second quarter of 2011, a decrease of $1.08 million from $1.86 million for the comparable period of 2010. The decrease was mainly due to the decrease of income before income tax from $7.0 million for the second quarter of 2010 to $4.64 million for the same period of 2011. The consolidated effective income tax rate for the second quarter of 2011 and 2010 was 16.9% and 26.8%, respectively. The change in the consolidated effective tax rate was mainly due to a permanent non-tax deductible interest expense resulting from amortization of a beneficial conversion feature for a convertible note and changing in fair value of conversion feature liability, 13.8% of pretax income for the second quarter of 2011 compared to 2.1% for the same quarter of 2010; non-tax deductible expenses were added back to taxable income for US income tax return purposes. The income tax rate for Shanghai TCH was 24% and 22% for 2011 and 2010, respectively. Xi’an TCH’s effective income tax rate for 2011 and 2010 is 15% as a result of its high tech enterprise status that was approved by the taxing authority. Xingtai Huaxin’s effective income tax rate for 2011 and 2010 is 25%. Huahong, Erdos TCH and Shengda’s effective income tax rate for 2011 is 25%.

*NET INCOME.* Our net income for the three months ended June 30, 2011 was $3.70 million compared to $5.04 million for the same period of 2010, a decrease of $1.34 million. This decrease in net income was mainly due to the fact that no system was completed and sold during the quarter, despite increased interest income from lease payments for energy saving systems compared with the second quarter of 2010.

### Comparison of Six Months Ended June 30, 2011 and 2010

The following table sets forth the results of our operations for the periods indicated as a percentage of net sales:

|  | 2011 $% of Sales |  | 2010 $% of Sales |  |
| --- | ---: | ---: | ---: | ---: |
| Sales | $11,928,821 | 100% | $32,663,947 | 100% |
| Sales of products | 11,343,798 | 95% | 31,921,309 | 98% |
| Contingent rental income | 585,023 | 5% | 742,638 | 2% |
| Cost of sales | (8,524,672) | 71% | (24,600,160) | 75% |
| Cost of products | (8,524,672) | 71% | (24,600,160) | 75% |
| Gross profit | 3,404,149 | 29% | 8,063,787 | 25% |
| Interest income on sales-type lease | 10,626,804 | 89% | 6,418,263 | 19% |
| Total operating income | 14,030,953 | 118% | 14,482,050 | 44% |
| Total operating expenses | (3,446,457) | 29% | (2,746,173) | 8% |
| Income from operations | 10,584,496 | 89% | 11,735,877 | 36% |
| Total non-operating income (expenses), net | 536,401 | 4% | (1,170,583) | (4)% |
| Income before income tax | 11,120,897 | 93% | 10,565,294 | 32% |
| Income tax expense | 2,179,631 | 18% | 2,898,043 | 9% |
| Less: net income attributable to noncontrolling interest | 683,298 | 6% | (486,573) | (1)% |
| Net income attributable to China Recycling Energy Corp | $8,257,968 | 69% | $7,180,678 | 22% |

*SALES.* Net sales of systems for the six months ended June 30, 2011 were $11.93 million while our net sales for the same period of 2010 were $32.66 million, a decrease of $20.74 million. The decrease was primarily due to the completion and sale of the 3rd 9MW capacity power station of Erdos Phase II project through sales-type leasing arrangements and $0.59 million from contingent rental income in the six months ended June 30, 2011; in comparison, net sales for the same period in fiscal year 2010 reflected (i) the completion and sale of the second 9MW capacity power station of Erdos Phase I project through sales-type lease in the first quarter of 2010, which included two 9MW units, the first 9MW capacity power station was completed and sold in December of 2009; (ii) the completion of transformation and sale of Pucheng Biomass Power Generation System; and (iii) contingent rental income of $0.74 million from actual usage of the electricity in addition to the minimum lease payments from our Shengwei Group - Tongchuan Project, Erdos Project and Shenmu Project. For the sales-type lease, sales and cost of sales are recorded at the time of leases; the interest income from the sales-type leases is our other major revenue source in addition to sales revenue.

*COST OF SALES.* Cost of sales for the six months ended June 30, 2011 was $8.52 million while our cost of sales for the comparable period of 2010 was $24.60 million, a decrease of $16.08 million. The 3rd 9MW capacity power station of Erdos Phase II project was the only system completed and sold during the six months ended June 30, 2011,, compared to the same period of 2010 when cost of sales consisted of the second 9MW capacity power station of Erdos Phase I project and Pucheng biomass power generation system.

*GROSS PROFIT*. Gross profit was $3.4 million for the six months ended June 30, 2011 compared to $8.06 million for the same period of 2010, a gross margin of 29% and 25% for the comparable period of 2011 and 2010, respectively.

*INTEREST INCOME ON SALES TYPE LEASES*. Interest income on sales-type leases for the six months ended June 30, 2011 was $10.63 million, a $4.21 million increase from $6.42 million for the comparable period of 2010. During the six months ended June 30, 2011, the interest income was derived from twelve systems: two TRT systems, two CHPG systems, one WGPG system, two waste heat power generating systems associated with our Erdos Phase I project and two systems of Erdos Phase II project, the Pucheng biomass power generation system and Zhongbao WHPG system, and the 3rd 9MW waste heat power generating system of Erdos Phase II project. During the six months ended June 30, 2010, interest income was generated from seven systems: two TRT systems, two CHPG systems, one WGPG system, and two waste heat power generating systems associated with our Erdos Phase I project.

*OPERATING EXPENSES.* Operating expenses consisted of selling, general and administrative expenses totaling $3.45 million for the six months ended June 30, 2011 as compared to $2.75 million for the same period of 2010, an increase of $0.7 million or 25%. The increase was due to proportional increases in our payroll, welfare, business trip and marketing expenses as a result of continuous expansion of our business; in addition, we recorded $1.45 million compensation expense for stock options during the six months ended June 30, 2011, compared to $1.41 million for the same period of 2010.

*NON-OPERATING INCOME (EXPENSES).* Non-operating expenses consisted of non sales-type lease interest income, interest expense, bank charges and some miscellaneous expenses. For the six months ended June 30, 2011, net non-operating income was $536,401 as compared to net non-operating expense of $1,170,583 for the comparable period of 2010. In the six months ended June 30, 2011 we had $1.32 million interest expense on loans and $3.34 million interest expense arising from the beneficial conversion feature of the convertible note from Carlyle and China Cinda, but offset by $6.13 million from changes in fair value of conversion feature liability of the convertible note from China Cinda; while in the same period of 2010, the interest expense was $1 million arising from the beneficial conversion feature for the convertible note.

*INCOME TAX EXPENSE.* Income tax expense was $2.18 million for the six months ended June 30, 2011, a decrease of $0.72 million from $2.9 million for the comparable period of 2010. The decrease was mainly due to non taxable interest income related to conversion feature liability but partially offset by non taxable interest expense. The consolidated effective income tax rate for the six months ended June 30, 2011 and 2010 was 16.9% and 27.4%, respectively. The change in the consolidated effective tax rate was mainly due to a permanent non-tax deductible interest expense resulting from amortization of a beneficial conversion feature for a convertible note and changing in fair value of conversion feature liability, 8.8% of pretax income for the six months ended June 30, 2011 compared to 2.8% for the same period of 2010; non-tax deductible expenses were added back to taxable income for US income tax return purposes. The income tax rate for Shanghai TCH was 24% and 22% for 2011 and 2010, respectively. Xi’an TCH’s effective income tax rate for 2011 and 2010 is 15% as a result of its high tech enterprise status that was approved by the taxing authority. Xingtai Huaxin’s effective income tax rate for 2011 and 2010 is 25%. Huahong, Erdos TCH and Shengda’s effective income tax rate for 2011 is 25%.

*NET INCOME.* Our net income for the six months ended June 30, 2011 was $8.26 million compared to $7.18 million for the same period of 2010, an increase of $1.08 million. This increase in net income was mainly due to the increased interest income from lease payments for energy saving systems compared with the same period of 2010.

### Liquidity and Capital Resources

### Comparison of Six Months Ended June 30June 30, 2011 and 2010

As of June 30, 2011, the Company had cash and cash equivalents of $10.56 million, other current assets were $12.52 million and current liabilities were $23.92 million. Working capital was a negative $0.84 million. The debt-to-equity ratio was 0.64:1 at June 30, 2011.

The following is a summary of cash provided by or used in each of the indicated types of activities during the six months ended June 30, 2011and 2010:

| Cash provided by (used in): | 2011 | 2010 |
| --- | ---: | ---: |
| Operating Activities | $(10,858,761) | $(14,399,702) |
| Investing Activities | 2,174,462 | (332,200) |
| Financing Activities | 7,890,419 | 18,688,594 |

Net cash used in operating activities was $10,858,761 during the six months ended June 30, 2011, as compared to $14,399,702 used in the comparable period of 2010. The decrease in net cash outflow was mainly from the sale of our third 9MW recycling waste heat power generation system of the Erdos Phase II project through sales-type lease for $11.34 million. This project commenced construction in 2010 and was completed in the first quarter of 2011, which resulted in cash inflow of $7.07 million from construction in progress in 2011, but was offset by payments of $12.23 million for construction related to the Shannxi Datong Coal Group Power Generation Projects and $1.72 million for the ShenQiu YuNeng Thermal Power Generation project. The construction was considered an operating activity due to the similar nature of producing inventory for sale. Cash received from collection of principal on sales type leases was $3.29 million in the six months ended June 30, 2011 compared with $1.59 million in the same period of 2010, an increase of $1.7 million.

Net cash provided by investing activities was $2.17 million in the six months ended June 30, 2011, compared to $0.33 million used in the comparable period of 2010. The increase of net cash provided by investing activities was mainly due to the release of restricted cash of $2.18 million from the bank which we previously deposited in the bank as collateral for the bank acceptances. In the same period of 2010 we deposited into bank $0.20 million as restricted cash and purchased equipment for $0.13 million.

Net cash provided by financing activities was $7.89 million for the six months ended June 30, 2011 compared to net cash provided by financing activities of $18.69 million for the comparable period in 2010. The cash inflow in the six months ended June 30, 2011 included $7.58 million in proceeds from convertible notes from China Cinda, $4.1 million in proceeds from a bank loan, offset by repayment on notes payable (bank acceptances) of $2.90 million and repayment of bank loan for $0.92 million.

On June 29, 2010, Xi’an TCH entered into a Biomass Power Generation Asset Transfer Agreement (the “Transfer Agreement”) with Dong, a natural person with Chinese citizenship. Under the Transfer Agreement, Dong transferred the Biomass Systems to Xi’an TCH, and Xi’an TCH will pay Dong RMB 100,000,000 ($14,705,900) for the systems, including RMB 20,000,000 in cash and RMB 80,000,000 with equivalent shares of the Company’s common stock. The stock price will be the same price as the Company’s public offering price in the first public offering which occurs in 2010 or 2011 but in no circumstance less than $4 per share. The exchange rate between U.S. Dollar and Chinese RMB in connection with the stock issuance is 1:6.8. As of June 30, 2011, the Company recorded shares to be issued of $11.78 million in connection with this transaction, although the shares have not yet been issued.

We believe we have sufficient cash to continue our current business through 2011 due to stable recurring receipts from sales-type leases in place. As of June 30, 2011, we have two TRT systems, two CHPG systems, one WGPG system, five recycling waste heat power generating systems from the Erdos projects, one BMPG and one WHPG of Zhongbao, currently generating net cash inflow. In addition, we have access to bank loans in case of an immediate need for working capital. We believe we have sufficient cash resources to cover our anticipated capital expenditures in 2011.

On May 25, 2011, the Company filed a Registration Statement on Form S-3 with the SEC to register an indeterminate number of shares of common stock with an aggregate initial offering price not to exceed $200,000,000. The registration statement has not gone effective, and the Company has not yet determined the size or timing of any potential future offering. We intend to use the net proceeds we receive from the sale of the shares of our common stock that may be offered for general corporate purposes, which may include, among other things, repayment of debt, repurchases of common stock, capital expenditures, the financing of possible acquisitions or business expansions, increasing our working capital and the financing of ongoing operating expenses and overhead.

We do not believe inflation has had a significant negative impact on our results of operations during 2011.

### Off-Balance Sheet Arrangements

We have not entered into any other financial guarantees or other commitments to guarantee the payment obligations of any third parties. We have not entered into any derivative contracts that are indexed to our shares and classified as stockholders’ equity or that are not reflected in our consolidated financial statements. Furthermore, we do not have any retained or contingent interest in assets transferred to an unconsolidated entity that serves as credit, liquidity or market risk support to such entity. We do not have any variable interest in any unconsolidated entity that provides financing, liquidity, market risk or credit support to us or engages in leasing, hedging or research and development services with us.

### Contractual Obligations

#### Convertible Notes Payable - Carlyle

On April 29, 2008, we issued and sold to Carlyle Asia Growth Partners III, L.P. (“CAGP”) and CAGP III Co. Investment, L.P. (together with CAGP, the “Investors”) a 5% Secured Convertible Promissory Note in the principal amount of $5,000,000. The terms for the note were amended and restated on April 29, 2009.

This note bore interest at 5% and matured on April 29, 2011. The principal amount of the note, together with any interest thereon, was convertible, at the option of the holders at any time on or after March 16, 2010 and prior to maturity, into shares of the Company’s common stock at an initial conversion price tied to the after-tax net profits of the Company for the fiscal year ending December 31, 2009. The obligation of the Company under this note is ranked senior to all other debt of the Company. The note is secured by a security interest granted to the investors pursuant to a share pledge agreement. This pledge was released during the six months ended June 30, 2011 and is of no further force or effect.

In June 2011, the Investors converted the note into 4,334,192 shares of the Company’s common stock at a conversion price of $1.154 per share. The effective date of the conversion was April 29, 2011. As of June 30, 2011, the interest accrued on the second note was fully paid, and the 4,334,192 shares of common stock were recorded as shares to be issued in the accompanying financial statements, since such shares were not issued as of June 30, 2010. As disclosed on a Form 8-K filed July 22, 2011, the Company issued 4,334,192 shares of common stock to the Investors on July 21, 2011 (4,149,599 shares of common stock to CAGP; 184,593 shares of common stock to CAGP III Co. Investment, L.P.). The unamortized portion BCF of $745,547 was fully amortized as of the conversion date. During the six months ended June 30, 2011, the Company amortized $1,368,988 BCF for the note.

On April 29, 2009, we issued an 8% Secured Convertible Promissory Note of $3 million to Carlyle Asia Growth Partners III, L.P. with a maturity date of April 29, 2012. The note holder has the right to convert all or any part of the aggregate outstanding principal amount of this note, together with interest, if any, into shares of our common stock, at any time on or after March 16, 2010 and prior to the maturity date (or such later date on which this note is paid in full), at a conversion price per share of common stock equal to $0.80, and this note was convertible in full into 3,750,000 shares of our common stock as of June 30, 2011. These conversion shares rank pari-passu with those issuable under the 5% Secured Convertible Promissory Note

#### Loan Payable – Collective Capital Trust Plan

On December 3, 2009, Beijing International Trust Co., Ltd. (“Beijing Trust”) formed a Low Carbon Fortune-Energy Recycling No. 1 Collective Capital Trust Plan (“Plan”), pursuant to the Capital Trust Loan Agreement entered into by Erdos TCH Energy Saving Development Co., Ltd and Beijing Trust dated November 19, 2009. Under the Plan, Beijing Trust raised RMB 181,880,000 ($26.75 million) through the sale of 181,880,000 total trust units at RMB 1 per unit. All amounts raised under the Plan are loaned to Erdos TCH in connection with the construction and operation of Phases II and III of the Erdos Power Generation Projects. These projects, when completed, will recycle waste heat from Erdos Metallurgy’s metal refining plants to generate electric power and steam, which will then be sold back to Erdos Metallurgy.

The Plan included 145,500,000 category A preferred trust units ($21.4 million), consisting of 12,450,000 category A1 preferred trust units ($1.8 million), 15,000,000 category A2 preferred trust units ($2.2 million), 118,050,000 category A3 preferred trust units ($17.4 million); and 36,380,000 category B secondary trust units ($5.35 million), consisting of 9,100,000 category B1 secondary trust units ($1.34 million) and 27,280,000 category B2 secondary trust units ($4.01 million). The B1 units were purchased by members of management of Erdos TCH and the B2 units were purchased by Xi’an TCH. Under the Agreement, the annual base interest rate is 9.94% for A1 preferred trust fund units with a term of two years, 11% for A2 preferred trust fund units with a term of three years, 12.05% for A3 preferred trust fund units and 8.35% for the category B secondary trust fund units, each with a term of four years.

Erdos TCH gave a lien on its equipment, assets and accounts receivable to guarantee the loans under the Agreement. Xi’an TCH and Mr. Guohua Ku, our CEO, also gave unconditional and irrevocable joint liability guarantees to Beijing Trust for Erdos TCH’s performance under the Agreement. Erdos (the minority stockholder and customer of Erdos TCH) provided a commitment letter on minimum power purchase from Erdos TCH.

On December 18, 2009, an additional RMB 25,000,000 ($3.68 million) was raised by Beijing Trust to support the Company’s Erdos Power Generation Projects. Beijing Trust sold 25,000,000 trust units at RMB 1 per unit which included 20,000,000 category A1 preferred trust units ($ 2.94 million) and 5,000,000 category B2 secondary trust units ($ 0.74 million). The B2 units were purchased by Xi’an TCH.

During December 2009, the Company sold aggregate 206,880,000 units for RMB 206,880,000 ($30.30 million), of which 9,100,000 units ($1.33 million) were purchased by the management of Erdos TCH; 32,280,000 units ($4.73 million) were purchased by Xi’an TCH; the amount of $4.73 million was considered as investment by Xi’an TCH into Erdos TCH and, accordingly, was eliminated in the Company’s consolidated financial statements.

On April 15, 2010, Beijing Trust completed the second expansion of the Plan. The second expansion of the Plan raised RMB 93,120,000 ($13.69 million) through the sale of 93,120,000 trust units at RMB 1 per unit. All amounts raised under the Second Expansion of the Plan are to be loaned to Erdos TCH. The second expansion of the Plan includes 2,800,000 category A1 preferred trust units ($0.41 million), 5,000,000 category A2 preferred trust units ($0.73 million), 66,700,000 category A3 preferred trust units ($9.81 million) and 4,650,000 category B1 preferred trust units ($0.68 million) and 13,970,000 category B2 secondary trust units ($2.05 million). The B1 units were purchased by members of management of Erdos TCH and the B2 units have been purchased by Xi’an TCH. With the completion of the second expansion of the Plan, the Low Carbon Fortune-Energy Recycling No. 1 Collective Capital Trust Plan has reached RMB 300,000,000 ($44.12 million) and completed its entire trust plan fund raising work. The net long term loan payable under this trust plan was RMB 252,150,000 ($38.5 million) at June 30, 2011. Interest expense accrued on this trust loan was $2.53 million and $4.5 million at June 30, 2011 and December 31, 2010, respectively.

In addition to the above, under the Loan Agreement, Erdos TCH must pay a management incentive benefit to Beijing Trust upon maturity of the category A3 and category B trust units in December 2013 if the ratio of Erdos TCH’s profit to its registered capital exceeds a base amount. If this criterion is met, the amount of the management incentive benefit is calculated based on a formula tied to Erdos TCH’s net profit and the average registered capital for the 2012 fiscal year. Under this formula the management incentive benefit could range between 0% and 100% of the net profit of Erdos TCH in the 2012 fiscal year.

The management incentive benefit was structured to provide an incentive to management to make the joint venture profitable. Under the Plan, Beijing Trust will distribute the entire amount of the management incentive benefit it receives to the holders of the category B trust units. As previously disclosed, the holders of the category B trust units are the management of Erdos TCH and Xi’an TCH. Category B trust units receive a lower base interest rate than the category A trust units but the economic return to the holders of category B trust units will be enhanced by any management incentive benefit.

Erdos TCH also agrees to share the benefits from the Clean Development Mechanism ("CDM") under the Kyoto Protocol equally with Beijing Trust during the term of the loan. Any benefit received from the CDM will be paid to Erdos Metallurgy first. Under the agreement with Xi’an TCH, Erdos Metallurgy agrees to deliver to Xi’an TCH 50% of the benefit Erdos Metallurgy receives. Xi’an TCH agrees to share 50% of the benefit it receives from Erdos Metallurgy with Erdos TCH. Under the Capital Trust Loan Agreement between Erdos TCH and Beijing Trust, Erdos TCH agrees that 50% of any benefit it receives will be delivered to Beijing Trust. Pursuant to the Plan, Beijing Trust will distribute 70% of the CDM benefit it receives to the holders of the category B trust units. The receipt of any CDM benefit is subject to a process of evaluation and certification of the project by the CDM Executive Board and is under the guidance of the Conference of the Parties of the United Nations Framework Convention on Climate Change. The first stages of the certification process have been completed successfully.

#### Bank Long Term Loan

The Company entered a loan agreement with Industrial Bank Co., Ltd., Xi’an Branch (the “Lender”) for a loan designed for energy saving and emission reduction projects, whereby the Lender agreed to loan RMB 30,000,000 ($4,635,639) to Xi’an TCH for three years from April 6, 2010 to April 6, 2013. The proceeds of the loan are required to be used in payment for equipment for Xi’an TCH’s energy saving and emission reduction projects. The Loan Agreement has a floating interest rate that resets at the beginning of each quarter at 110% of the national base interest rate for the same term and same level loan (currently 7.015%). Under the loan, Xi’an TCH is required to make quarterly interest payments and, beginning six months after the date of the release of the funds, to make minimum quarterly principal payments of RMB 3,000,000 ($463,564) each quarter. The Loan Agreement contains standard representations, warranties and covenants, and the loan is guaranteed by Xi’an TCH, Shaanxi Shengwei Construction Material Group and Mr. Guohua Ku. At June 30, 2011, $927,128 of the principal was repaid and $1,854,256 will be repaid within one year which was classified as a current liability.

The Company entered another loan agreement with the same Industrial Bank for energy saving and emission reduction projects, whereby the Lender agreed to loan RMB 30,000,000 ($4,635,639) to Xi’an TCH for three years from March 31, 2011 to March 30, 2014. As of June 30, 2011, the Company received RMB 27,000,000 ($4,172,075) of the loan. The proceeds of the loan are required to be used in payment for construction and equipment purchase for Xi’an TCH’s energy saving and emission reduction projects. The Loan Agreement has a floating interest rate that resets at the beginning of each quarter at 115% of the national base interest rate for the same term and same level loan (currently 7.015%). Under the loan, Xi’an TCH is required to make quarterly interest payments and, beginning six months after the date of the release of the funds, to make minimum quarterly principal payments of RMB 3,000,000 ($463,564) each quarter. The Loan Agreement contains standard representations, warranties and covenants, and the loan is guaranteed by Xi’an TCH, Mr. Guohua Ku and Ms Chaoying Zhang. At June 30, 2011, $463,564 of the principal was repaid and $1,854,256 will be repaid within one year which was classified as current liability.

#### Convertible note agreement with China Cinda

On August 18, 2010, the Company and its wholly-owned subsidiaries Sifang, Shanghai TCH and Xi’an TCH entered into a Notes Purchase Agreement (the “Note Agreement”) with China Cinda (HK) Asset Management Co., Ltd, a company organized under the laws of the Hong Kong Special Administrative Region of China (“Cinda”). Under the terms of the Note Agreement, the Company will issue to Cinda two tranches of convertible notes (the “Notes”), each having a principal amount equal to the US Dollar equivalent of RMB 50 million ($7.8 million). Also on August 18, 2010, Xi’an TCH and China Jingu International Trust Co. Ltd. (“Jingu”), an affiliate of Cinda entered into a Capital Trust Loan Agreement (“Trust Loan Agreement”), in which Jingu will raise 100 million RMB ($15.5 million) under a Jingu CREG Recycling Economy No. 1 Collective Fund Trust Plan (“Trust Plan”) and lend such amount under the Trust Plan to Xi’an TCH (the “Loans”). If the Loans under the Trust Loan Agreement do not occur, then under the Note Agreement the principal amount of the Notes to be issued in each tranche will be the US dollar equivalent of RMB 100 million ($15.5 million). All proceeds from the Notes and the Loans will be used to complete Phases IV and V of the Erdos TCH Energy Saving Development Co., Ltd. (“Erdos TCH”) project, a joint venture between Xi’an TCH and Erdos Metallurgy Co., Ltd. to recycle waste heat from Erdos Metallurgy’s refining plants to generate power and steam and sell them back to Erdos Metallurgy, as well as other working capital needs.

The term of the Loans is for three years from the date of the first draw. The interest rate for the Loans is the People’s Bank of China’s (“PBOC”) three year loan base interest rate plus two percent (2%). If the Loans are not fully exchanged for shares of the Common Stock of the Company as described below prior to maturity, Xi’an TCH will pay the difference between the interest rate described above and 18% on the outstanding amount. Under the Trust Loan Agreement and separate agreements entered by Jingu, Erdos TCH, Shanghai TCH, Xi’an TCH and Mr. Guohua Ku on August 18, 2010, Erdos TCH shall pledge the accounts receivable, equipment and assets of its Phases IV and V projects to Jingu as a guarantee to the Loans, Xi’an TCH shall pledge its 80% equity in Erdos TCH to Jingu as a guarantee to the Loans, Shanghai TCH shall provide a joint liability guarantee to Jingu for the Loans, and Mr. Guohua Ku shall provide his personal joint liability to Jingu for the Loans.

Under the Note Agreement the Notes shall be issued before August 18, 2011. The Notes have a three year maturity date from the date of the issuance of the first tranche. The exchange rate between RMB and US Dollar for each issue of Notes is the middle rate published by the PBOC for the second business day prior to each issuance. Each Note bears interest at a rate equal to that of PBOC base interest rate for the relevant interest period (the period commencing on and including January 1 of each year and ending on and including December 31 of such year) plus two percent (2%). If Cinda does not convert or fully convert the Notes to shares prior to maturity, the Company will pay the difference between the interest rate described above and 18% on the outstanding amount.

As collateral for the Notes, Mr. Guohua Ku, the CEO and a major shareholder of the Company, entered into a Share Pledge Agreement with Cinda, on August 18, 2010, to pledge 4,500,000 shares of the Company’s common stock held by him to secure the first Note. The Agreement also calls for an additional 4,500,000 shares of the Company’s common stock held by Mr. Ku to secure the second Note before its issuance. On December 30, 2010, the Company received proceeds of RMB50, 000,000 ($7,533,391) from the first tranche of the Loans. On January 30, 2011, the Company received proceeds of another RMB 50,000,000 ($7,533,391) from the first tranche convertible Note.

### Commitments

#### Erdos Phase III of Power Generation Projects

In April 2009, Erdos TCH signed a contract with Erdos Metallurgy to recycle heat from groups of furnaces of Erdos Metallurgy’s metal refining plants to generate power and steam, to be sold back to Erdos Metallurgy. According to the contract, Erdos TCH will install a group of power generation projects with a total of 70MW power capacity, which may grow up to 120MW, and 30-ton steam per hour, with an estimated total investment in excess of $76 million (RMB 500 million). The Company split the construction of the projects into three phases, two units of power generation in Phase I with a total of 18MW power capacity, three units in Phase II with a total of 27MW power capacity and one unit in Phase III with 25MW power capacity. For each phase of the project, the lease term is 20 years starting from the date of completion of the phase. During the lease term, Erdos TCH will be responsible for operating the projects and charge Erdos Metallurgy for supply of electricity and steam. Erdos Metallurgy agreed to pay a fixed minimum of $0.22 million (RMB 1.5 million) per month for each 9MW capacity power generation system.

During the first quarter of 2010, the Erdos power generation system Phase I project was completed and put into operation. During the fourth quarter of 2010 and first quarter of 2011, three 9MW power generation systems of Phase II were completed and put into operation. Erdos TCH outsourced to an independent third party the operation and maintenance of the power generation system for $922,000 (RMB 6.27 million) per year for each system. After 20 years, the systems will be transferred to Erdos without any charge.

As of June 30, 2011 the projects of Erdos Phase III are under construction. At June 30, 2011, the Company has paid $18.19 million for Phase III. The Company expects the completion of Phase III projects no later than the end of 2011.

#### Shannxi Datong Coal Group Power Generation Projects

In February 2011, Xi'an TCH signed a contract with Shannxi Datong Coal Group Steel Ltd Co (Shannxi Datong) to recycle gas and steam from groups of blast-furnaces and converter of Shannxi Datong's metal refining plants to generate power. According to the contract, the Company will install two 3MW TRT and one 15MW WGPG and two 1MW steam power generation systems, with a total of 23MW power capacity for an estimated total investment of $27.45 million (RMB 180 million). The lease term is 30 years. During the lease term, Shannxi Datong will be responsible for operating the projects and pay a service fee to the Company. The service fee is based on an average of 8,000 electricity-generating hours per year and RMB 0.33 per kilowatt hour ("Kwh") for the first 5 years from the completion of each power generation station. For each of the leases, at the 6th year, 11th year and 21st year thereafter, the rate will be RMB 0.3 Kwh, 0.27 Kwh and 0.25 Kwh, respectively. After 30 years, the units will be transferred to Shannxi Datong without any charge.

On February 28,2011, Xi’an TCH entered into an agreement with Xi’an Huaxin Energy Tech Co., Ltd (the contractor for construction) for Shannxi Datong Coal projects of two 3MW TRT and one 15 MW WGPG systems described above. The project is scheduled to complete in 12 months from construction commencement.

#### ShenQiu Thermal Power Generation Projects

On May 25, 2011, Xi’an TCH entered into a Letter of Intent with ShenQiu YuNeng Thermal Power Ltd Co., (“ShenQiu”) for Xi’an TCH to reconstruct and transform a Thermal Power Generation System owned by ShenQiu into a 75T/H Biomass Power Generation Systems for approximately RMB 22.5 million (approximately $3.5 million). The project commenced in June 2011 and will be completed in 90 days. Xi’an TCH will purchase the power station within 10 days of the completion of the transformation.

#### Financial Leasing

#### Financing Agreement- - Sale Lease-back transaction.

On June 28, 2011, Xi’an TCH, entered into a Financing Agreement (the “Agreement”) with Cinda Financial Leasing Co., Ltd. (the “Cinda Financial”), an affiliate of China Cinda (HK) Asset Management Co., Ltd. (the “Cinda HK”).

Under the Agreement, Xi’an TCH transferred its ownership of a set of 7MW steam turbine waste heat power generation system and four furnaces and ancillary apparatus (the “Assets”) to Cinda Financial for RMB 42.50 million ($6.64 million), and Cinda Financial in turn leased the Assets to Xi’an TCH for 5 years with an overall leasing fee of RMB 51.54 million ($8.05 million) based upon the transfer cost and the benchmark interest rate for five year loans by People’s Bank of China (“PBOC”) (presently 6.65%) plus 15% of that rate (which at present is 7.6475%). The interest rate will increase if the five year benchmark interest rate of PBOC increases but will remain the same if the benchmark rate decreases in the future. Xi’an TCH shall make pro rata quarterly payments to Cinda Financial for the leasing fees. Upon the completion of the leasing term and full payment of all leasing fees and other fees, Xi’an TCH can pay RMB 4,250 ($664) to reacquire the ownership of the Assets.

In addition to the leasing fees, Xi’an TCH shall pay a onetime non-refundable leasing service charge of RMB 2,550,000 ($398,438) and a refundable security deposit of RMB 2,125,000 ($332,031) to Cinda Financial.

In accordance with ASC 840-10-25-4, since CREG retains substantially all of the benefits and risks relating to the property, this transaction is a financing and will be recorded as such. The proceeds of this financing were not received prior to June 30, 2011; therefore, this transaction will be recorded in the third quarter of 2011.

## Market risk

As filed, 352 characters.

### Exchange Rate Risk

Our operations are conducted mainly in the PRC. As such, our earnings are subject to movements in foreign currency exchange rates when transactions are denominated in RMB, which is our functional currency. Accordingly, our operating results are affected by changes in the exchange rate between the U.S. dollar and those currencies

## Controls and procedures

As filed, 2,629 characters.

### Disclosure Controls and Procedures

The Company maintains disclosure controls and procedures which are designed to provide reasonable assurance that information required to be disclosed in the Company’s periodic SEC reports is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to its principal executive officer and principal financial officer, as appropriate, to allow timely decisions regarding required disclosure. The Company’s management, with the participation of the Company’s Chief Executive Officer and Chief Financial Officer, has evaluated the effectiveness of the Company’s “disclosure controls and procedures,” as such term is defined in Rules 13a – 15(e) and 15d – 15(e) of the Securities Exchange Act of 1934 (“Exchange Act”) at the end of the period covered by the report.

Based upon that evaluation, our Chief Executive Officer and Chief Financial Officer concluded that, at June 30, 2011, the Company’s disclosure controls and procedures were effective to provide reasonable assurance that (i) the information required to be disclosed by us in this Report was recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and (ii) information required to be disclosed by us in our reports that we file or submit under the Exchange Act is accumulated and communicated to our management, including our principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

### Changes in Internal Control Over Financial Reporting

With the participation of the Company’s management, including its Chief Executive Officer and Chief Financial Officer, the Company also conducted an evaluation of the Company’s internal control over financial reporting to determine whether any changes occurred during the Company’s fiscal quarter ended June 30, 2011, that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting. Based on such evaluation, management concluded that, as of the end of the period covered by this report, there have not been any changes in the Company’s internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) during the fiscal quarter to which this report relates that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

## Risk factors

As filed, 896 characters.

There have been no material changes in our risk factors from those disclosed in Part I, Item 1A, of our Annual Report on Form 10-K as of and for the year ended December 31, 2010. An investment in our common stock involves various risks. When considering an investment in our company, you should consider carefully all of the risk factors described in our most recent Form 10-K. If any of those risks, incorporated by reference in this Form 10-Q, occur, the market price of our shares of common stock could decline and investors could lose all or part of their investment. These risks and uncertainties are not the only ones facing us and there may be additional matters that we are unaware of or that we currently consider immaterial. All of these could adversely affect our business, financial condition, results of operations and cash flows and, thus, the value of an investment in our company.

Filed Aug 15, 2011.
Source: SEC EDGAR, the filing index for accession 0001144204-11-046740. Last ingested by Listed: Oct 24, 2026, 14:55 ET. No prices; not investment advice.