# Smart Powerr Corp.: Form 10-Q for the period ended Mar 31, 2013

- Company: [Smart Powerr Corp.](/companies/creg.md) (CIK 721693)
- Form: 10-Q
- Filed: 2013-05-15
- Accepted by EDGAR: May 15, 2013, 13:00 ET
- Period: 2013-03-31
- Accession: 0001144204-13-029013
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/721693/000114420413029013/v344229_10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/721693/000114420413029013/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2013-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2013-01-01 to 2013-03-31 | $14.3m | us-gaap:Revenues |
| Cost of revenue | 3 months, 2013-01-01 to 2013-03-31 | $10.9m | us-gaap:CostOfRevenue |
| Gross profit | 3 months, 2013-01-01 to 2013-03-31 | $3.4m | us-gaap:GrossProfit |
| Operating income | 3 months, 2013-01-01 to 2013-03-31 | $6.2m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2013-01-01 to 2013-03-31 | $1.5m | us-gaap:InterestExpense |
| Income tax | 3 months, 2013-01-01 to 2013-03-31 | $1.4m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2013-01-01 to 2013-03-31 | $3.3m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2013-01-01 to 2013-03-31 | $0.07 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2013-01-01 to 2013-03-31 | $0.07 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2013-01-01 to 2013-03-31 | 50,945,906 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2013-01-01 to 2013-03-31 | $575.1k | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2013-01-01 to 2013-03-31 | $4.4k | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2013-03-31 | $44.8m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2013-03-31 | $58.8m | us-gaap:AssetsCurrent |
| Total assets | at 2013-03-31 | $210.5m | us-gaap:Assets |
| Current liabilities | at 2013-03-31 | $66.2m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2013-03-31 | $87.4m | us-gaap:Liabilities |
| Long-term debt | at 2013-03-31 | $3.4m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2013-03-31 | $1.3m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2013-03-31 | $123.1m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 72,537 characters.

### Note Regarding Forward-Looking Statements

*This quarterly report on Form 10-Q and other reports filed by the Company from time to time with the SEC (collectively the “Filings”) contain or may contain forward-looking statements and information that are based upon beliefs of, and information currently available to, Company’s management as well as estimates and assumptions made by Company’s management. Readers are cautioned not to place undue reliance on these forward-looking statements, which are only predictions and speak only as of the date hereof. When used in the filings, the words “anticipate”, “believe”, “estimate”, “expect”, “future”, “intend”, “plan”, or the negative of these terms and similar expressions as they relate to Company or Company’s management identify forward-looking statements. Such statements reflect the current view of Company with respect to future events and are subject to risks, uncertainties, assumptions, and other factors (including the statements in the section “results of operations” below), and any businesses that Company may acquire. Should one or more of these risks or uncertainties materialize, or should the underlying assumptions prove incorrect, actual results may differ significantly from those anticipated, believed, estimated, expected, intended, or planned.*

*Although the Company believes the expectations reflected in the forward-looking statements are based on reasonable assumptions, the Company cannot guarantee future results, levels of activity, performance, or achievements. Except as required by applicable law, including the securities laws of the United States, the Company does not intend to update any of the forward-looking statements to conform these statements to actual results. Readers are urged to carefully review and consider the various disclosures made throughout the entirety of this report, which attempts to advise interested parties of the risks and factors that may affect our business, financial condition, results of operations, and prospects.*

*Our financial statements are prepared in US Dollars and in accordance with accounting principles generally accepted in the United States. See “Foreign Currency Translation and Comprehensive Income (Loss)” below for information concerning the exchange rates at which Renminbi (“RMB”) were translated into US Dollars (“USD”) at various pertinent dates and for pertinent periods.*

### OVERVIEW OF BUSINESS BACKGROUND

The Company was incorporated on May 8, 1980 as “Boulder Brewing,” under the laws of the State of Colorado. On September 6, 2001, the Company re-domiciled its state of incorporation from Colorado to Nevada. On March 8, 2007, the Company changed its name to “China Recycling Energy Corporation.” The Company, through its subsidiaries Shanghai TCH Energy Technology Co., Ltd. (“Shanghai TCH”) and Huahong New Energy Technology Co, Ltd, sells and leases energy saving systems and equipment to its customers.

#### Historical Overview

In September 2001, Boulder Brewing changed its state of incorporation from Colorado to Nevada and its name to Boulder Acquisitions, Inc., or Boulder Acquisitions. From the date of reincorporation until June 23, 2004, Boulder Acquisitions had no material operations or assets.

On June 23, 2004, Boulder Acquisitions completed a stock exchange with the stockholders of Sifang Holdings Co., Ltd. (“Sifang Holdings”). The exchange was consummated under Nevada and Cayman Islands law pursuant to the terms of a Securities Exchange Agreement, dated June 23, 2004 by and among Boulder Acquisitions, Sifang Holdings and the stockholders of Sifang Holdings. Pursuant to the Securities Exchange Agreement, Boulder Acquisitions issued 13,782,636 shares of its common stock to the stockholders of Sifang Holdings, 89.7% of its post-exchange issued and outstanding common stock, for 100% of the outstanding capital stock of Sifang Holdings.

Effective August 6, 2004, we changed our name from Boulder Acquisitions, Inc. to China Digital Wireless, Inc. From August 2004 to December 2006, we primarily engaged in pager and mobile phone distribution and provided value added information services to the customers in the People’s Republic of China (“PRC”). We phased out and scaled down our operations in the mobile phone distribution business and the pager and mobile phone value-added information services, and, on May 10, 2007, the Company approved and announced it discontinued these businesses.

In December 2006, we began to conduct business in the energy saving and recycling industry, including purchasing equipment, devices, hardware and software for the construction and installation of TRT systems and other renewable energy products. TRT is an electricity generating system that utilizes the exhaust pressure and heat produced in the blast furnace of steel mills to generate electricity. TRT has commercial value, because TRT allows steel mills to use waste heat and steam to produce electricity for the operation of the mills.

#### Current Business

Our current business is primarily conducted through our wholly-owned subsidiary, Sifang Holdings, its wholly-owned subsidiaries, Huahong New Energy Technology Co., Ltd. (“Huahong”) and Shanghai TCH, Shanghai TCH’s wholly-owned subsidiaries, Xi’an TCH Energy Technology Company, Ltd (“Xi’an TCH”), and Xi’an TCH’s subsidiary Erdos TCH Energy Saving Development Co., Ltd (“Erdos TCH”), in which 93% of the investment will be from Xi’an TCH, a joint venture between Xi’an TCH and Erdos Metallurgy Co., Ltd. Shanghai TCH was established as a foreign investment enterprise in Shanghai under the laws of the PRC on May 25, 2004, currently with registered capital of $29.80 million. Xi’an TCH was incorporated in Xi’an, Shaanxi Province under the laws of the PRC on November 8, 2007. Erdos TCH was incorporated in April 2009. Huahong was incorporated in February 2009.

#### Hebei Xingtai Steel Group Project

On April 8, 2007, our Board of Directors approved and made effective a TRT Project Joint-Operation Agreement (“Joint-Operation Agreement”) which was conditionally entered into on February 1, 2007 between Shanghai TCH and Xi’an Yingfeng Science and Technology Co., Ltd. (“Yingfeng”). Under the Joint-Operation Agreement, Shanghai TCH and Yingfeng jointly pursued a project to design, construct, install and operate two TRT systems for Xingtai Iron and Steel Company, Ltd. (“Xingtai”). These two projects were completed and put into operation in February and August 2007, respectively. On October 31, 2007, Shanghai TCH entered an asset-transfer agreement with Yingfeng. The terms and conditions of this agreement required the transfer of all electricity-generating related assets owned by Yingfeng to Shanghai TCH. As a result, the contractual relationship between Shanghai TCH and Yingfeng under the TRT Project Joint-Operation Agreement was terminated. Xingtai power generation system lease term ended in January 2012, and, as a result, the system was subsequently transferred to Xingtai.

#### Shanxi Zhangzhi Steel Group Project

Under the Joint-Operation Agreement discussed above, Shanghai TCH and Yingfeng also jointly pursued a project, which was entered into between Yingfeng and Zhangzhi Iron and Steel Company, Ltd. (“Zhangzhi”) on June 22, 2006, to design, construct, install and operate a TRT system for Zhangzhi. Shanghai TCH contributed various investments and properties to the project, including cash, hardware, software, equipment, major components and devices. In return, Shanghai TCH obtained all the rights, titles, benefits and interests that Yingfeng originally had under the Project Contract, including but not limited to, the regular cash payments made by Xingtai and other property rights and interests. On October 31, 2007, Shanghai TCH acquired this contract as part of its asset-transfer agreement with Yingfeng discussed above. Per the transferred contracts, Shanghai TCH installed and owns the TRT system and leases it to Zhangzhi for 13 years, from July 25, 2007 to July 25, 2020. During the term of the lease, Zhangzhi will pay Shanghai TCH a monthly rent of $0.16 million (RMB 1.1 million). After the lease expires and all rents owed are paid, Shanghai TCH will transfer the title of the system to Zhangzhi free of charge.

#### Shengwei Group – Tong Chuan

In November 2007, Shanghai TCH signed a cooperative agreement with Shengwei Group to build two sets of 12MW cement low temperature heat power generation systems for Shengwei’s two 2,500-tons-per-day cement manufacturing lines in Jing Yang and for a 5,000-tons-per-day cement manufacturing line in Tong Chuan. At the end of 2008, construction of the cement low temperature heat power generation in Tong Chuan was completed at a cost of $6,191,000 (RMB 43,000,000) and put into operation. Under the original agreement, the ownership of the cement low temperature heat power generation systems would have belonged to Shengwei starting from the date the projects were put into service. On May 20, 2009, Shanghai TCH entered into a supplementary agreement with Shengwei Group to change the timing of title transfer to Shengwei from the date the projects put into operation to the end of the lease term. Shanghai TCH is responsible for the daily maintenance and repair of the projects, and charges Shengwei a monthly electricity fee based on the actual power generated by the projects at 0.4116 RMB per kWh for an operating period of five years, from the date that the project is put in service for power generation or eleven (11) months after the agreement date whichever comes first, with assurances from Shengwei of a properly functioning 5,000-tons-per-day cement manufacturing line and not less than 7,440 heat hours per year for the electricity generator system. Shengwei Group collateralized the cement manufacturing line in Tong Chuan to guarantee its obligations to provide the minimum electricity income from the power generator system under the agreement during the operating period. At the end of the five-year operating period, Shanghai TCH will have no further obligations under the cooperative agreement. On November 11, 2008, Shanghai TCH transferred all of its rights and obligations under the agreement to Xi’an TCH. In addition, the supplementary agreement entered into on May 20, 2009 provided that Xi’an TCH will charge Shengwei based on actual power usage subject to a minimum of $0.31 million (RMB 2.1 million) per month during the operating period (lease term).

#### Shengwei Group – Jing Yang Project

On June 29, 2009, construction of the cement low temperature heat power generation system in Jing Yang was completed at a cost of $7,318,000 (RMB 50,000,000) and put into operation pursuant to a waste heat power generation cooperative agreement entered into in November 2007. Shanghai TCH charges Shengwei a monthly technical service fee of $336,600 (RMB 2,300,000) for the 60 months of the lease, starting from the date that the project is put into service for power generation or 11 months after the date of the agreement whichever comes first. Shengwei has the right to purchase the cement low temperature heat power generation system for $29,000 (RMB 200,000) at the end of the lease. Shengwei is required to provide assurances of properly functioning two 2,500-tons-per-day cement manufacturing lines and not less than 7,440 heat hours per year for the cement low temperature heat power generation. Shengwei Group collateralized the cement manufacturing lines in Jing Yang to guarantee its obligations to provide the minimum electricity income from the waste energy power generator system under the agreement during the operating period. On November 11, 2008, Shanghai TCH transferred all of its rights and obligations under the agreement to Xi’an TCH. Effective July 1, 2009, Xi’an TCH started outsourcing the operation and maintenance of the cement low temperature heat power generation systems in Tong Chuan and JingYang to a third party for $732,000 (RMB 5,000,000) per year.

#### Shenmu Project

On September 30, 2009, Xi’an TCH delivered to Shenmu County Jiujiang Trading Co., Ltd. (“Shenmu”) a set of three 6MW capacity waste gas power generation systems pursuant to a Cooperative Contract on Coke-oven Gas Power Generation Project (including its Supplementary Agreement) and a Gas Supply Contract for Coke-oven Gas Power Generation Project (the “Contracts”). The Contracts are for 10 years and state Xi’an TCH will recycle coke furnace gas from the coke-oven plant of Shenmu to generate power, which will be supplied back to Shenmu. Shenmu agreed to supply Xi’an TCH the coke-oven gas free of charge. Under the Contracts, Shenmu will pay Xi’an TCH an annual “energy-saving service fee” of approximately $5.6 million in equal monthly installments for the life of the Contracts, as well as such additional amounts as may result from the supply of power to Shenmu in excess of 10.8 million kilowatt hours per month. Xi’an TCH is responsible for operating the projects, which it does through an unrelated third party. Shenmu guarantees that monthly gas supply will not be less than 21.6 million standard cubic meters. If gas supply is less, Shenmu agrees to pay Xi’an TCH the energy-saving service fee described above for up to 10.8 million kilowatt-hours per month. Xi’an TCH maintains ownership of the project throughout the term of the contracts, including the already completed investment, design, equipment, construction and installation as well as the operation and maintenance of the project. At the end of the 10-year term, ownership of the projects will be transferred to Shenmu at no charge. Shenmu provided a lien on its production line to guarantee its performance under the Contracts. Shenmu’s three major stockholders provided an unlimited joint liability guarantee to Xi’an TCH guaranteeing Shenmu’s performance under the Contracts and the Yulin Huiyuan Group, an independent third party, provides a guarantee to Xi’an TCH for Shenmu’s performance under the Contracts.

On December 31, 2011, Xi’an TCH entered into a Repurchase Agreement for the Coke-Oven Gas Power Generation Project (the “Repurchase Agreement”) with Shenmu. Under the Repurchase Agreement, Shenmu purchased the set of 18MW capacity power generating systems (the “Systems”) from Xi’an TCH and paid outstanding energy saving service fees of $3.08 million (RMB 19.44 million) to Xi’an TCH within three working days from the date of the Repurchase Agreement. Xi’an TCH transferred the Systems to Shenmu for $18.75 million (RMB 120 million) (the “Repurchase Price”), which was paid in three installments within 180 days. In June 2012, the Company received the full payment of the outstanding energy saving service fees and system repurchase price, and, as a result, ownership of the Systems was transferred to Shenmu and the Cooperative Contract was terminated.

#### Erdos Projects

On April 14, 2009, the Company incorporated a joint venture (“JV”) with Erdos Metallurgy Co., Ltd. (“Erdos”) to recycle waste heat from Erdos' metal refining plants to generate power and steam, which will then be sold back to Erdos. The name of the JV is Inner Mongolia Erdos TCH Energy Saving Development Co., Ltd (“Erdos TCH”) with a term of 20 years, and initial registered capital of $2,635,000 (RMB 18,000,000). As of March 31, 2013, total registered capital was increased to $17.55 million (RMB 120 million), of which $16.37 million (RMB 112 million) was contributed by Xi’an TCH and $1.18 million (RMB 8 million) was from Erdos Metallurgy. Total investment for the project is estimated at $79 million (RMB 500 million) with an initial investment of $17.55 million (RMB 120,000,000). As of March 31, 2013, Erdos contributed 7% of the total investment of the project, and Xi’an TCH contributed 93%. With respect to profit distribution, Xi’an TCH and Erdos will receive 80% and 20% of the profit from the JV, respectively, until Xi’an TCH has received the complete return of its investment. Xi’an TCH and Erdos will then receive 60% and 40% of the profit from the JV, respectively. The profits to be distributed will be computed based on Chinese generally accepted accounting principles. The principal difference between US GAAP and Chinese GAAP, with regards to the Erdos TCH project, is that a sales-type lease under US GAAP is treated as an operating lease under Chinese GAAP. When the term of the JV expires, Xi’an TCH will transfer its equity in the JV to Erdos at no cost.

On April 18, 2009, Erdos TCH signed a Cooperation Agreement with Erdos to recycle heat from a variety of furnaces of Erdos Metallurgy’s metal refining plants to generate power and steam, which will then be sold back to Erdos Metallurgy. According to the contract, Erdos TCH will install a group of power generation projects with a total of 70MW power capacity, which may expand up to 120MW, and 30-ton steam per hour, with an estimated total investment in excess of $79 million (RMB 500 million). The construction of the projects was split into three phases, two power generation systems in Phase I with a total of 18MW power capacity, three power generation systems in Phase II with a total of 27MW power capacity and one power generation system in Phase III with 25MW power capacity.

At the end of 2009, Erdos TCH completed the first 9MW power station of Phase I of the project and put it into operation. At the end of March 2010, Erdos TCH completed the construction of Phase I through completion of the second 9MW power station and delivery of the units for operation. Phase I includes two 9MW systems for a combined 18MW power capacity. Pursuant to the Cooperation Agreement and the supplement agreements signed between Erdos and Erdos TCH, Erdos shall purchase all the electricity and steam to be generated from the JV’s power generation systems. Erdos TCH leased the two 9MW systems to Erdos and is responsible for their operation and maintenance. For each phase of the project, the lease term is 20 years starting from the date of completion of the phase. Erdos agreed to pay a fixed minimum of $0.24 million (RMB 1.5 million) per month for each 9MW capacity power generation system. In addition Erdos will pay the actual amount if the actual sale of the electricity generated is more than $0.24 million (RMB 1.5 million) monthly per unit. Effective January 2010 and April 2010 respectively, Erdos TCH outsourced to an independent third party the operation and maintenance of the two 9MW power generation projects for $995,000 (RMB 6.27 million) each per year. After 20 years, the units will be transferred to Erdos without charge. During the fourth quarter of 2010, Erdos power generation system Phase II, two 9MW capacity electricity power generation system, was completed and put into operation. During the first quarter of 2011, Erdos power generation system Phase II, the 3rd 9MW capacity electricity power generation system, was completed and put into operation through a sales type lease with terms similar to the Phase I project.

In September 2012, Erdos TCH, Erdos and the general contractor, Xianyang Hengfeng Energy Engineering Co., Ltd (“Hengfeng”), terminated the construction of the Phase III power generation system projects due to the fact that Erdos, as a result of a change in its business strategy, stopped construction of the refining plant. As of the termination date, Erdos TCH incurred construction costs of $19.86 million (RMB 125.44 million). Of this amount, Hengfeng returned $13.72 million (RMB 86.70 million) to Erdos TCH towards payments for construction in progress and Erdos paid $3.58 million (RMB 22.04 million) to Erdos TCH for the loss. Erdos TCH, in turn, paid $0.32 million (RMB 2.0 million) to Hengfeng for losses resulting from the project’s termination. Erdos incurred a net loss of $2.96 million (RMB 18.74 million) from the termination of this project.

#### Pucheng Biomass Project

On January 20, 2010, Xi’an TCH entered into a Technical Reconstruction Letter of Intent with Xueyi Dong (“Dong”), a natural person with Chinese citizenship, for Xi’an TCH reconstructing and transforming a Thermal Power Generation System owned by Dong into a 12MW Biomass Power Generation Systems (“Biomass Systems” or “BMPG”) for $2.2 million (RMB 15 million); of which, $1.03 million (RMB 7 million) was payable to Dong, and $1.18 million (RMB 8 million) to one of the Company’s shareholders, who had previously paid that amount to Dong on behalf of the Company.

After the successful transformation of the systems, Xi’an TCH entered into a Biomass Power Generation Asset Transfer Agreement (the “Transfer Agreement”) with Dong on June 29, 2010. Under the Transfer Agreement, Dong transferred the Biomass Systems to Xi’an TCH, and Xi’an TCH agreed to pay Dong $14,705,900 (RMB 100,000,000) for the systems, including RMB 20,000,000 in cash and RMB 80,000,000 in shares of the Company’s common stock. The Company has paid the consideration (including the cash portion) in full. On November 22, 2011, our Board of Directors approved the issuance of 2,941,176 shares of the Company’s common stock to Dong at $4 per share pursuant to the terms of the agreement. The Company recorded a gain of $8.3 million as a result of a change in fair value of liability, which was marked to market. These shares have piggy back registration rights and were subject to a one year lock-up period. The shares issued to Dong were included in a Form S-3 Registration Statement, as amended, that we initially filed with the SEC on February 22, 2012 and amended on April 12, 2012 and May 7, 2012. The resale Form S-3 Registration Statement was declared effective by the SEC on May 18, 2012.

On June 29, 2010, Xi’an TCH entered into a Biomass Power Generation Project Lease Agreement with Pucheng XinHengYuan Biomass Power Generation Co., Ltd., (“XHY”). Under this lease, Xi’an TCH leased this same set of 12MW biomass power generation systems to XHY at a minimum of $279,400 (RMB 1,900,000) per month for 15 years. The leasing fee will increase proportionately with the biomass generated electricity fee in China during the term of this lease agreement.

#### Zhongbao Project

On September 30, 2010, Xi’an TCH delivered to Zhongbao Binhai Nickel Co., Ltd. (“Zhongbao”) a set of 7MW capacity Waste Heat Power Generation (“WHPG”) systems, which are integral parts of the facilities designed to produce 80,000 tons of nickel-alloy per year according to the recovery and power generation of the waste heat agreement with Zhongbao, an agreement that was transferred from China Zhonggang Binhai Enterprise Ltd. (“Zhonggang”) in July 2009. Zhongbao is a nickel-alloy manufacturing joint venture between Zhonggang and Shanghai Baoshan Steel Group established in June 2009. Total investment in this project was approximately $7.8 million (RMB 55 million). The Contract is for nine years and states that Xi’an TCH will recycle waste heat from the nickel-alloy rotary kilns of Zhongbao to generate power and steam, which will be supplied back to Zhongbao, and help to reduce over 20,000 tons of carbon dioxide emissions every year. By the end of the term, the system shall be transferred to Zhongbao at RMB 1. Under the Contracts, Zhongbao will pay the Company a monthly “energy-saving service fee” based on the volume of the electricity and steam generated from the WHPG system in the prior month within the first five days of each month at a pre-agreed price, but no less than the minimum monthly payment of $238,000 (RMB 1.5 million). Zhongbao agreed to supply Xi’an TCH the nickel-alloy rotary kilns gas, non-salty water and compressed air free of charge and brine at $1.00 (RMB 6.3) per ton. Zhongbao also guarantees to continuously supply not less than 6,800 heat hours per year for the WHPG, or the operating term will be extended accordingly. Xi’an TCH outsources its operation and maintenance obligations to a third party for annual payments of $380,000 (RMB 2.4 million). In addition, Xi’an TCH is responsible for applying the Clean Development Mechanism (“CDM”) and the net proceeds from CDM will be distributed between Zhongbao and Xi’an TCH at 60% and 40%, respectively. As of March 31, 2013, Xi’an TCH had not yet commenced the CDM application process.

In June 2011, the ZhongBao system was sold to and leased back from Cinda Financial Leasing Co., Ltd. (the “Cinda Financial”); the Company engaged a third party guarantee company to serve as guarantor for the loan, which was approved by the Industrial Bank on July 1, 2011.

#### Shanxi Datong Coal Group Power Generation Projects

In February 2011, Xi’an TCH signed a contract with Shanxi Datong Coal Group Steel Co., Ltd (the “Shanxi Datong”) to recycle gas and steam from groups of blast-furnaces and converter of Shanxi Datong’s metal refining plants to generate power. According to the contract, Xi’an TCH will install two 3MW TRT, one 15MW WGPG and two 1MW steam power generation systems, with a total of 23MW power capacity for an estimated total investment of $28.6 million (RMB 180 million). The lease term is 30 years. During the lease term, Shanxi Datong will be responsible for operating the projects and pay service fee to Xi’an TCH. The service fee is based on an average of 8,000 electricity-generating hours per year and $0.05 (RMB 0.33) per kilowatt hour (“kWh”) for the first five years from the completion of each power generation station. For each of the leases, at the 6th year, 11th year and 21st year thereafter, the rate will be RMB 0.3 kWh, 0.27 kWh and 0.25 kWh, respectively. After 30 years, the units will be transferred to Shanxi Datong without charge.

On February 28, 2011, Xi’an TCH entered into an agreement with Xi’an Huaxin Energy Tech Co., Ltd (the contractor for construction) for Shanxi Datong Coal projects of two 3MW TRT and one 15MW WGPG systems described above.

As of March 31, 2013, the Company had paid $21.40 million for the Shanxi Datong Coal Group Power Generation project and is committed to paying an additional $7.89 million. The project was previously halted due to a business reorganization of Shanxi Datong and a renegotiation of one of the power stations with Xi’an TCH to amend certain construction plans. The construction of this project was resumed in April 2012 and the Company expects to complete the project by the middle of 2013.

#### Shenqiu Yuneng Biomass Power Generation Projects

On May 25, 2011, Xi’an TCH entered into a Letter of Intent with Shenqiu YuNeng Thermal Power Co., Ltd. (the “Shenqiu”) for Xi’an TCH to reconstruct and transform a Thermal Power Generation System owned by Shenqiu into a 75T/H Biomass Power Generation System for $3.57 million (RMB 22.5 million). The project commenced in June 2011, and was completed in the third quarter of 2011. On September 28, 2011, Xi’an TCH entered into a Biomass Power Generation Asset Transfer Agreement with Shenqiu. Per the Transfer Agreement, Shenqiu sold to Xi’an TCH a set of 12 MW biomass power generation systems, effectuation of such sale occurring after Xi’an TCH converted the system for biomass power generation purposes. As consideration for the biomass power generation system, Xi’an TCH agreed to pay Shenqiu $10,937,500 (RMB 70 million) in cash in three installments within six months upon the transfer of ownership of the system. By the end of fiscal year 2012, all of the consideration was paid in full. On September 28, 2011, Xi’an TCH and Shenqiu also entered into a Biomass Power Generation Project Lease Agreement (the “Lease Agreement”). Under the Lease Agreement, Xi’an TCH agreed to lease a set of 12MW biomass power generation systems to Shenqiu for $286,000 (RMB 1,800,000) per month for 11 years. Upon completion of the Lease Agreement, ownership of this system will be transferred from Xi’an TCH to Shenqiu at no cost. Shenqiu provided one month leasing fee as security deposit to Xi’an TCH as well as personal guarantees from its legal representative.

On October 8, 2012, Xi’an TCH entered into a Letter of Intent for Technical Reformation of Shenqiu Project Phase II with Shenqiu for technical reformation to enlarge the capacity of the Shenqiu Project Phase I. The technical reformation involved the construction of another 12MW biomass power generation system. After the reformation, the generation capacity of the power plant increased to 24MW. The project commenced on October 25, 2012 and was completed during the first quarter of 2013. During the construction period, from November 2012 to March 2013, Xi'an TCH agreed to stop charging Shenqiu Phase I rental fees. On March 30, 2013, Xi’an TCH and Shenqiu entered into a Biomass Power Generation Project Lease Agreement (the “Lease Agreement”). Under the Lease Agreement, Xi’an TCH agreed to lease the second set of 12MW biomass power generation systems to Shenqiu for $239,000 (RMB 1,500,000) per month for 9.5 years. Upon completion of the Lease Agreement, ownership of this system will be transferred from Xi’an TCH to Shenqiu at no cost.

### Related Party Transactions

Erdos TCH sold all power generation stations through sales type leases to Erdos Metallurgy Co., Ltd., the non-controlling interest holder. Total sales and interest income for this non-controlling interest was $0.2 million and $1.83 million for the three months ended March 31, 2013, and $0.1 million and $1.86 million for the three months ended March 31, 2012, respectively.

### Critical Accounting Policies and Estimates

Our management’s discussion and analysis of our financial condition and results of operations are based on our consolidated financial statements, which were prepared in accordance with US GAAP. The preparation of these financial statements requires us to make estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the date of the financial statements as well as the reported net sales and expenses during the reporting periods. On an ongoing basis, we evaluate our estimates and assumptions. We base our estimates on historical experience and on various other factors that we believe are reasonable under the circumstances, the results of which form the basis for making judgments about the carrying value of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates under different assumptions or conditions.

While our significant accounting policies are more fully described in Note 2 to our consolidated financial statements, we believe the following accounting policies are the most critical to aid you in fully understanding and evaluating this management discussion and analysis.

### Basis of Presentation

These accompanying consolidated financial statements were prepared in accordance with US GAAP and pursuant to the rules and regulations of the SEC for financial statements.

### Basis of Consolidation

The consolidated financial statements include the accounts of CREG and, its subsidiary, Sifang Holdings; Sifang Holdings’ wholly owned subsidiaries, Huahong and Shanghai TCH; Shanghai TCH’s subsidiary Xi’an TCH; and Erdos TCH, in which 93% of Erdos TCH’s investment is from Xi’an TCH. Substantially all of the Company’s revenues are derived from the operations of Shanghai TCH and its subsidiaries, which represent substantially all of the Company’s consolidated assets and liabilities as of March 31, 2013 and December 31, 2012, respectively. All significant inter-company accounts and transactions were eliminated in consolidation.

### Use of Estimates

In preparing the consolidated financial statements, management makes estimates and assumptions that affect the reported amounts of assets and liabilities in the balance sheets as well as revenues and expenses during the year reported. Actual results may differ from these estimates.

### Concentration of Credit Risk

Cash includes cash on hand and demand deposits in accounts maintained within China. Balances at financial institutions within China are not covered by insurance. The Company has not experienced any losses in such accounts.

Certain other financial instruments, which subject the Company to concentration of credit risk, consist of accounts and other receivables. The Company does not require collateral or other security to support these receivables. The Company conducts periodic reviews of its customers’ financial condition and customer payment practices to minimize collection risk on accounts receivable.

The operations of the Company are located in the PRC. Accordingly, the Company’s business, financial condition and results of operations may be influenced by the political, economic and legal environments in the PRC.

### Revenue Recognition

#### Sales-type Leasing and Related Revenue Recognition

The Company constructs and then leases waste energy recycling power generating projects to its customers. The Company usually transfers ownership of the waste energy recycling power generating projects to its customers at the end of each lease. Investment in these projects is recorded as investment in sales-type leases in accordance with Statement of Financial Accounting Standards (“SFAS”) No. 13, “Accounting for Leases” (codified in Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) Topic 840) and its various amendments and interpretations. The Company manufactures and constructs the waste energy recycling power generating projects and finances its customers for the price of the projects. The sales and cost of sales are recognized at the time of sale or inception of the lease. The investment in sales-type leases consists of the sum of the total minimum lease payments receivable less unearned interest income and estimated executory cost. Unearned interest income is amortized to income over the lease term so as to produce a constant periodic rate of return on the net investment in the lease. While a portion of revenue is recognized at the inception of the lease, the cash flow from the sales-type lease occurs over the course of the lease. Revenue is net of the Value Added Tax.

#### Contingent Rental Income

The Company records the income from actual electricity usage in addition to minimum lease payment of each project as contingent rental income in the period earned. Contingent rent is not part of minimum lease payments.

### Foreign Currency Translation and Comprehensive Income (Loss)

The Company’s functional currency is the Renminbi (“RMB”). For financial reporting purposes, RMB were translated into United States dollars (“USD”) as the reporting currency. Assets and liabilities are translated at the exchange rate in effect at the balance sheet date. Revenues and expenses are translated at the average rate of exchange prevailing during the reporting period. Translation adjustments arising from the use of different exchange rates from period to period are included as a component of stockholders’ equity as “Accumulated other comprehensive income”. Gains and losses from foreign currency transactions are included in income. There has been no significant fluctuation in exchange rate for the conversion of RMB to USD after the balance sheet date.

The Company uses SFAS 130 “Reporting Comprehensive Income.” Comprehensive income is comprised of net income and all changes to the statements of stockholders’ equity, except those due to investments by stockholders, changes in paid-in capital and distributions to stockholders.

### Recent Accounting Pronouncements

As of March 31, 2013, there were no recently issued accounting standards not yet adopted by the Company that would have a material effect on the Company’s consolidated financial statements.

### RESULTS OF OPERATIONS

### Comparison of Three Months Ended March 31, 2013 and 2012

The following table sets forth the results of our operations for the periods indicated as a percentage of net sales:

|  | 2013 $% of Sales |  | 2012 $% of Sales |
| --- | ---: | ---: | ---: |
| Sales | $14,340,571 | 100% | $147,553 100% |
| Sales of systems | 14,079,796 | 98% | -% |
| Contingent rental income | 260,775 | 2% | 147,553 100% |
| Cost of sales | 10,900,912 | 76% | - -% |
| Cost of systems | 10,900,912 | 76% | (14,383) 10% |
| Gross profit | 3,439,659 | 24% | 133,170 90% |
| Interest income on sales-type lease | 3,824,840 | 27% | 4,814,250 3263% |
| Total operating income | 7,264,499 | 51% | 4,947,420 3353% |
| Total operating expenses | (1,082,446) | (8)% | (779,555) 528% |
| Income from operations | 6,182,053 | 43% | 4,167,865 2825% |
| Total non-operating expenses, net | (1,402,888) | (10)% | (1,538,974) (1043)% |
| Income before income tax | 4,779,165 | 33% | 2,628,891 1782% |
| Income tax expense | 1,360,054 | 9% | 487,392 330% |
| Less: net income attributable to noncontrolling interest | 120,921 | 1% | 118,934 81% |
| Net income attributable to China Recycling Energy Corp | $3,298,190 | 23% | $2,022,565 1371% |

*SALES.* Total sales, including system sales and contingent rental income, for the three months ended March 31, 2013 was $14.34 million while the total sales for the comparable period of 2012 was $0.15 million, an increase of $14.19 million as a result of increases in system sales and in contingent rental income. Of the total sales, sales of systems for the three months ended March 31, 2013 was $14.08 million, as compared to $0 for the comparable period of 2012, an increase of $14.08 million. For the three months ended March 31, 2013, Shenqiu Phase II project was completed and sold. In comparison, in the same period of 2012, none of the Company’s power stations had been completed and sold. For the three months ended March 31, 2013, the Company received contingent rental income of $0.26 million from actual usage of the electricity in addition to the minimum lease payments, compared to $0.15 million for the comparable period in year 2012. For the sales-type lease, sales and cost of sales (“COS”) are recorded at the time of leases; interest income from the sales-type leases is our other major revenue source in addition to sales revenue.

*COST OF SALES.* COS for the three months ended March 31, 2013 was $10.90 million while our COS for the comparable period of 2012 was $14,383, an increase of $10.89 million which was mainly due to the fact that the Shenqiu Phase II power generation was completed and sold during the three months ended March 31, 2013, while no project was sold during the comparable period of 2012.

*GROSS PROFIT*. Gross profit was $3.44 million for the three months ended March 31, 2013 compared to $0.13 million for the comparable period of 2012, a gross margin of 24% and 90% for the comparable period of 2013 and 2012, respectively. The lower margin was the result of a power station that was completed and sold, with a 30% markup, during the three months ended Mach 31, 2013. Compared to the margin of the comparable period of 2012, contingent rental income, for the three months ended March 31, 2013, had a lower cost.

*INTEREST INCOME ON SALES TYPE LEASES*. Interest income on sales-type leases for the three months ended 2013 was $3.82 million, a $0.99 million decrease from $4.81 million for the comparable period of 2012. During the first quarter of 2013, interest income was derived from 11 systems: one TRT system, two CHPG systems, two systems with Erdos Phase I project and three systems of Erdos Phase II project, the Pucheng biomass power generation system, Shenqiu biomass power generation system and Zhongbao WHPG system. The Company sold Shenqiu Phase II project on March 30, 2013 and started collecting payments in April. In comparison, during the first quarter of 2012, interest income was derived from 11 systems: one TRT system, two CHPG systems, two systems with Erdos Phase I project and three systems of Erdos Phase II project, the Pucheng biomass power generation system, Shenqiu biomass power generation system and Zhongbao WHPG system.

*OPERATING EXPENSES.* Operating expenses consisted of selling, general and administrative expenses totaling $1.08 for the three months ended March 31, 2013 as compared to $0.78 million for the comparable period of 2012, an increase of $0.30 million or 39%. The increase was mainly due to increased legal expense of $0.2 million and increased auditing fee of $0.06 million compared to the same period of last year.

*NON-OPERATING INCOME (EXPENSES).* Non-operating expenses consisted of non sales-type lease interest income, interest expense, bank charges and some miscellaneous expenses. For the three months ended March 31, 2013, net non-operating expense was $1.40 million compared to net non-operating expense of $1.54 million for the comparable period of 2012. For the three months ended March 31, 2013, we had $1.49 million interest expense on loans, which was offset by $0.09 million interest income. For the comparable period of 2012, we had $1.78 million interest expense on loans, $0.82 million interest expense arising from the conversion feature of the convertible note from Carlyle and China Cinda, which was offset by $1.13 million from changes in fair value of conversion feature liability of the convertible note from China Cinda.

*INCOME TAX EXPENSE.* Income tax expense was $1.36 million for the three months ended March 31, 2013, an increase of $0.87 million from $0.49 million for the comparable period of 2012. The increase was mainly due to increased sales and taxable income. The consolidated effective income tax rate for the three months ended March 31, 2013 and 2012 was 28.5% and 18.5%, respectively. The income tax rate for Shanghai TCH was 25% for 2013 and 2012. Xi’an TCH’s effective income tax rate for 2013 and 2012 is 25% and 15%, respectively, as a result of its high tech enterprise status that was approved by the taxing authority in 2012, but pending in 2013 which is assessed annually. Huahong and Erdos TCH effective income tax rate for 2013 and 2012 is 25%.

*NET INCOME.* Our net income for the three months ended March 31, 2013 was $3.30 million compared to $2.02 million for the comparable period of 2012, an increase of $1.28 million. This increase in net income was mainly due to the increased total sales compared with the comparable period of 2012.

### Liquidity and Capital Resources

### Comparison of the three months ended March 31, 2013 and 2012

As of March 31, 2013, the Company had cash and cash equivalents of $44.85 million, other current assets of $13.98 million, current liabilities of $66.2 million, a working capital deficit of $(7.4) million, and a debt-to-equity ratio of 0.53:1.

The following is a summary of cash provided by or used in each of the indicated types of activities during the three months ended March 31, 2013 and 2012:

| Cash provided by (used in): | 2013 | 2012 |
| --- | ---: | ---: |
| Operating Activities | $575,072 | $10,038,621 |
| Investing Activities | 1,688,341 | (475,894) |
| Financing Activities | (2,539,312) | 1,917,406 |

Net cash provided by operating activities was $0.58 million during the three months ended March 31, 2013, as compared to $10.04 million provided by operating activities in the comparable period of 2012. The decrease in net cash inflow was mainly from increases in sales type lease receivables from the sale of Shenqiu Phase II system; however, this decrease was partially offset by the increased net income and accounts payable outstanding. The Shenqiu Phase II project commenced construction in October 2012 and was completed at the end of the first quarter of 2013, which resulted in cash inflow of $3.73 million from construction in progress in 2013, but was partially offset by payments of $2.07 million for construction related to the Shannxi Datong Coal Group Power Generation Projects. The construction was considered an operating activity due to the similar nature of producing inventory for sale.

Net cash provided by investing activities was $1.69 million for the three months ended March 31, 2013, compared to $0.48 million outflow in the comparable period of 2012. The increase of net cash provided by investing activities was mainly due to the release of $1.69 million in restricted cash. In the comparable period of 2012, the cash inflow was due to the deposit of $0.48 million into a bank as restricted cash.

Net cash used in financing activities was $2.54 million for the three months ended March 31, 2013 compared to net cash provided by financing activities of $1.92 million for the comparable period of 2012. The cash outflow in the three months ended March 31, 2013 included $6.85 million repayment of bank loans and $0.64 million increased notes receivable, which was partially offset by the $4.78 million in proceeds from bank loans. In comparison, for the comparable period of 2012, we had $4.76 million in proceeds from a bank loan, which was offset by the repayment of a bank loan of $0.95 million and $2.41 million in repayment to related parties.

We believe we have sufficient cash to continue our current business through 2013 due to recurring receipts from sales-type leases in place. As of March 31, 2013, we have one TRT system, two CHPG systems, five recycling waste heat power generating systems from the Erdos projects, three BMPG systems and one WHPG system of Zhongbao generating net cash inflow. In addition, we have access to bank loans in case of an immediate need for working capital. We believe we have sufficient cash resources to cover our anticipated capital expenditures in 2013.

On May 25, 2011, the Company filed a Registration Statement on Form S-3, as amended, with the SEC to register an indeterminate number of shares of common stock with an aggregate initial offering price not to exceed $200,000,000. The registration statement went effective on November 10, 2011; however, the Company has not yet determined the size or timing of any potential future offering. We intend to use the net proceeds we receive from the sale of shares of our common stock for general corporate purposes, which may include, among other things, repayment of debt, repurchases of common stock, capital expenditures, the financing of possible acquisitions or business expansions, increasing our working capital and/or the financing of ongoing operating expenses and overhead.

We do not believe inflation has had a significant negative impact on our results of operations in 2013.

### Transfers of Cash To and From our Subsidiaries

The Company is able to transfer cash (U.S. dollars) to its PRC subsidiaries by: (i) investment – increasing the Company’s registered capital in a PRC subsidiary or (ii) a shareholder loan. Other than as follows, to date, its PRC subsidiaries have not transferred any earnings / cash to the Company. The Company’s business is primarily conducted through its subsidiaries. The Company is a holding company and its material assets consist solely of the ownership interests held in its PRC subsidiaries. The Company relies on dividends paid by its subsidiaries for its working capital / cash needs, including: (i) the funds necessary to pay dividends/cash distributions to its shareholders, (ii) to service any debt obligations and (iii) to pay operating expenses. As a result of PRC laws and regulations (noted below) that require annual appropriations of 10% of after-tax income to be set aside in a general reserve fund prior to payment of dividends, the Company’s PRC subsidiaries are restricted to that extent, as well as the others noted below, in their ability to transfer a portion of their net assets to the Company as a dividend.

The PRC has currency and capital transfer regulations that require us to comply with regulations for the movement of capital.

With respect to transferring cash from the Company to its subsidiaries, increasing the Company’s registered capital in a PRC subsidiary requires the pre-approval of the local commerce department, and a shareholder loan requires a filing with the state administration of foreign exchange or its local bureau.

With respect to the payment of dividends:

1\. PRC regulations currently permit the payment of dividends only out of accumulated profits, as determined in accordance with accounting standards and PRC regulations (an in-depth description of the PRC regulations is set forth below);

2\. our PRC subsidiaries are required to set aside, at a minimum, 10% of their net income after taxes, based on PRC accounting standards, each year as statutory surplus reserves until the cumulative amount of such reserves reaches 50% of their registered capital;

3\. these reserves may not be distributed as cash dividends;

4\. our PRC subsidiaries may also allocate a portion of their after-tax profits to fund their staff welfare and bonus funds; except in the event of a liquidation, these funds may also not be distributed to shareholders; as disclosed in Note 18, the Company does not participate in a Common Welfare Fund; and

5\. the incurrence of debt, specifically the instruments governing such debt, may restrict a subsidiary’s ability to pay shareholder dividends or make other cash distributions; the Company is subject to covenants and consent requirements (presently, the Company has all consents necessary).

If, for the reasons noted above, our subsidiaries are unable to pay shareholder dividends and/or make other cash payments to the Company when needed, the Company’s ability to conduct operations, make investments and/or acquisitions, or undertake other activities requiring working capital may be materially and adversely affected. However, our operations and business, including investment and/or acquisitions by our subsidiaries within China, will not be affected as long as the capital is not transferred in or out of the PRC.

#### PRC Regulations

In accordance with PRC regulations on Enterprises with Foreign Investment and their articles of association, a foreign-invested enterprise (“FIE”) established in the PRC is required to provide statutory reserves, which are appropriated from net profit, as reported in the FIE’s PRC statutory accounts. FIEs are required to allocate at least 10% of its annual after-tax profit to the surplus reserve until such reserve has reached 50% of its respective registered capital (based on the FIE’s PRC statutory accounts). The aforementioned reserves may only be used for specific purposes and may not be distributed as cash dividends. In the event that the FIE’s statutory accounts are insufficient to satisfy this requirement, the FIE’s shareholders are required to contribute capital required to satisfy the registered capital requirement. Until such contribution of capital is satisfied, the FIE is not allowed to repatriate profits to its shareholders, unless approved by the State Administration of Foreign Exchange. After satisfaction of this requirement, the remaining funds may be appropriated at the discretion of the FIE’s board of directors. Our subsidiary, Shanghai TCH, qualifies as an FIE and is therefore subject to the above-mandated regulations on distributable profits.

Additionally, in accordance with PRC Company Law, a domestic enterprise is required to maintain a surplus reserve of at least 10% of its annual after-tax profit until such reserve has reached 50% of its respective registered capital based on the enterprise’s PRC statutory accounts. A domestic enterprise is also required to provide discretionary surplus reserve, at the discretion of the board of directors, from the profits determined in accordance with the enterprise’s PRC statutory accounts. The aforementioned reserves can only be used for specific purposes and may not be distributed as cash dividends. Xi’an TCH, Huahong, and Erdos TCH were established as domestic enterprises; therefore, each is subject to the above-mentioned restrictions on distributable profits.

As a result of PRC laws and regulations that require annual appropriations of 10% of after-tax income to be set aside, prior to payment of dividends, in a general reserve fund, the Company’s PRC subsidiaries are restricted in their ability to transfer a portion of their net assets to the Company as a dividend or otherwise.

#### Chart of the Company’s Statutory Reserve

Pursuant to PRC corporate law, effective on January 1, 2006, the Company is now required to maintain a statutory reserve by appropriating from its after-tax profit before declaration or payment of dividends. The statutory reserve represents restricted retained earnings. Our restricted and unrestricted retained earnings under US GAAP are set forth below:

|  | As at March 31, 2013 | December 31, 2012 |
| --- | ---: | ---: |
| Unrestricted retained earnings | $39,985,433 | $37,107,107 |
| Restricted retained earnings (surplus reserve fund) | 8,185,866 | 7,766,002 |
| Retained earnings (including surplus reserve fund) | $48,171,299 | $44,873,109 |

### Off-Balance Sheet Arrangements

We have not entered into any financial guarantees or other commitments to guarantee the payment obligations of any third parties. We have not entered into any derivative contracts that are indexed to our shares and classified as stockholders’ equity or that are not reflected in our consolidated financial statements. Furthermore, we do not have any retained or contingent interest in assets transferred to an unconsolidated entity that serves as credit, liquidity or market risk support to such entity. We do not have any variable interest in any unconsolidated entity that provides financing, liquidity, market risk or credit support to us or engages in leasing, hedging or research and development services with us.

### Contractual Obligations

#### Loan Payable – Collective Capital Trust Plan

On December 3, 2009, the Company and Beijing International Trust Co., Ltd. (“Beijing Trust”) formed a Low Carbon Fortune-Energy Recycling No. 1 Collective Capital Trust Plan (“Plan”) pursuant to the Capital Trust Loan Agreement (the “Agreement”) entered into by Erdos TCH Energy Saving Development Co., Ltd and Beijing Trust dated November 19, 2009. All amounts raised under the Plan were loaned to Erdos TCH in connection with its waste heat power generation projects Phase II and Phase III construction and operation.

Under the Agreement, the annual base interest rate was 9.94% for A1 preferred trust fund units with a term of two years, 11% for A2 preferred trust fund units with a term of three years, 12.05% for A3 preferred trust fund units and 8.35% for the category B secondary trust fund units, each with a term of four years. Erdos TCH provided a lien on its equipment, assets and accounts receivable to guarantee the loans under the Agreement. Xi’an TCH and Mr. Guohua Ku, the CEO, the Chairman of the Company’s Board of Directors and a major shareholder, provided unconditional and irrevocable joint liability guarantees to Beijing Trust for Erdos TCH’s performance under the Agreement. Erdos (the minority shareholder and customer of Erdos TCH) provided a commitment letter on minimum power purchase from Erdos TCH.

The Trust Plan raised $44.1 million (RMB 300,000,000) through a series of capital raises in 2009 and 2010, of which, 13,750,000 B1 units ($2.0 million) were purchased by the management of Erdos TCH; 1,600,000 ($235,600) A1 units and 46,250,000 B2 units ($7.4 million) were purchased by Xi’an TCH, the amount was considered as an investment by Xi’an TCH into Erdos TCH and, accordingly, was eliminated in the consolidated financial statements. Portion of category A units (RMB 35,250,000) were due and paid in full on December 3, 2011, of which, RMB 1,600,000 was purchased by Xi’an TCH. As of March 31, 2013, the net loan payable under this trust plan was $31.5 million (RMB 197,500,000) and will be due within one year.

In addition to the above, under the Loan Agreement, Erdos TCH must pay a management incentive benefit to Beijing Trust upon maturity of the category A3 and category B trust units in December 2013 if the ratio of Erdos TCH’s profit to its registered capital exceeds a base amount. If this criterion is met, the amount of the management incentive benefit is calculated based on a formula tied to Erdos TCH’s net profit and the average registered capital for the 2012 fiscal year. Under this formula the management incentive benefit could range between 0% and 100% of the net profit of Erdos TCH in the 2012 fiscal year.

The management incentive benefit was structured to provide an incentive to management to make the joint venture profitable. Under the Plan, Beijing Trust will distribute the entire management incentive benefit it receives to the holders of the category B trust units. As previously disclosed, the holders of the category B trust units are the management of Erdos TCH and Xi’an TCH. Category B trust units receive a lower base interest rate than the category A trust units but the economic return to the holders of category B trust units will be enhanced by any management incentive benefit.

For the year ended December 31, 2012, Erdos TCH incurred a net loss under both PRC GAAP and US GAAP.

Erdos TCH also will share the benefits from Clean Development Mechanism ("CDM") under the Kyoto Protocol equally with Beijing Trust during the term of the loan. Any benefit received from CDM will be paid to Erdos Metallurgy first. Under the agreement with Xi’an TCH, Erdos Metallurgy agrees to deliver to Xi’an TCH 50% of the benefit Erdos Metallurgy receives. Xi’an TCH agrees to share 50% of the benefit it receives from Erdos Metallurgy with Erdos TCH. Under the Capital Trust Loan Agreement between Erdos TCH and Beijing Trust, Erdos TCH agrees that 50% of any benefit it receives will be delivered to Beijing Trust. Pursuant to the Plan, Beijing Trust will distribute 70% of the CDM benefit it receives to the holders of the category B trust units. The receipt of any CDM benefit is subject to a process of evaluation and certification of the project by the CDM Executive Board and is under the guidance of the Conference of the Parties of the United Nations Framework Convention on Climate Change. The first stages of the certification process have been completed successfully.

#### Bank Loans – Industrial Bank

Xi’an TCH entered an agreement with Industrial Bank Co., Ltd., Xi’an Branch (the “Lender”) for a loan designed for energy saving and emission reduction projects, whereby the Lender agreed to loan $4.79 million (RMB 30,000,000) to Xi’an TCH for three years from April 6, 2010 to April 6, 2013. The proceeds of the loan were required to be used in payment for equipment for Xi’an TCH’s energy saving and emission reduction projects. The loan had a floating interest rate that resets at the beginning of each quarter at 110% of the national base interest rate for the same term and same level loan (then 6.77%). As of March 31, 2013, this loan had an outstanding balance of $0.48 million. This loan was repaid in full on the maturity date, April 6, 2013.

Xi’an TCH entered into another loan agreement with the same Industrial Bank for energy saving and emission reduction projects, whereby the Lender agreed to loan $4.79 million (RMB 30,000,000) to Xi’an TCH for three years to March 30, 2014. The proceeds of the loan were required to be used in payment for construction and equipment purchase for Xi’an TCH’s energy saving and emission reduction projects. The loan agreement had a floating interest rate that resets at the beginning of each quarter at 115% of the national base interest rate for the same term and same level loan (then 7.07%). Under the loan, Xi’an TCH is required to make quarterly interest payments and, beginning six months after the date of the release of the funds, to make minimum quarterly principal payments of $474,000 (RMB 3,000,000). The loan agreement contained standard representations, warranties and covenants, and the loan is guaranteed by Xi’an TCH, Mr. Guohua Ku and Ms. Chaoying Zhang. As of March 31, 2013, this loan had an outstanding balance of $2.39 million that is to be repaid within one year.

On November 8, 2011, Xi’an TCH entered the third loan agreement with the same Industrial Bank, for its energy saving and emission reduction projects, whereby the Lender agreed to loan $20.74 million (RMB 130,000,000) to Xi’an TCH for a term of four years, ending on November 27, 2015. The proceeds of the loan are required to be used to make payments on construction and equipment purchases relating to Xi’an TCH’s energy saving and emission reduction projects. The loan agreement has a floating interest rate that resets at the beginning of each quarter at 115% of the national base interest rate for the same term and same level loan (then 7.36%). Under the loan, Xi’an TCH is required to make quarterly interest payments and, beginning nine months after the date of the release of the funds, to make minimum quarterly principal payments of $1.59 million (RMB 10,000,000). For the first nine months, the loan was in a grace period and there were no repayment requirements. The loan is guaranteed by the accounts receivable of Xi’an TCH, Pucheng and Shenqiu BMPG systems and Mr. Guohua Ku, individually. As of March 31, 2013, this loan had outstanding balance of $15.95 million, of which, $6.38 million is to be repaid within one year, and $9.57 million is to be repaid after one year.

#### Bank Loans – Bank of Xi’an

During the first quarter of 2012, Xi’an TCH entered into an agreement with Bank of Xi’an, whereby the Lender agreed to loan $4,743,158 (RMB 30,000,000) to Xi’an TCH for one year with maturity on March 1, 2013. The proceeds of the loan were required to be used in payment for power generation equipment purchases. The monthly interest rate of the Loan is 0.60133%. The Company paid a third party $119,322 (RMB 750,000) as a re-guarantee service fee. This loan was repaid at maturity.

On March 28, 2013, Xi’an TCH entered into another agreement with Bank of Xi’an, whereby Bank of Xi’an agreed to loan $4.79 million (RMB 30,000,000) to Xi’an TCH for one year with maturity on March 27, 2014. The proceeds of the loan are required to be used in payment for power generation equipment purchases. The monthly interest rate of the Loan is 0.575%. Under the terms of the loan, Xi’an TCH is required to make monthly interest payments and the principal is to be repaid at maturity. The loan is guaranteed by a third party guarantee company and Mr. Guohua Ku. The Company paid a third party $113,483 (RMB 712,500) as a re-guarantee service fee.

#### Convertible note agreement with China Cinda and its affiliate

On August 18, 2010, the Company and its wholly-owned subsidiaries Sifang, Shanghai TCH and Xi’an TCH entered into a Notes Purchase Agreement (the “Note Agreement”) with China Cinda (HK) Asset Management Co., Ltd, a company organized under the laws of the Hong Kong Special Administrative Region of China (the “Cinda”). Under the terms of the Note Agreement, the Company issued to Cinda two tranches of convertible notes (the “Notes”), each having a principal amount equal to the US Dollar equivalent of $7.8 million (RMB 50 million). Also on August 18, 2010, Xi’an TCH and China Jingu International Trust Co. Ltd. (“Jingu”), an affiliate of Cinda, entered into a Capital Trust Loan Agreement (the “Trust Loan Agreement”), in which Jingu raised $15.5 million (RMB100 million) under a Jingu CREG Recycling Economy No. 1 Collective Fund Trust Plan (the “Trust Plan”) and lend such amount under the Trust Plan to Xi’an TCH (the “Loans”). If the Loans under the Trust Loan Agreement do not occur, then under the Note Agreement the principal amount of the Notes to be issued in each tranche will be the US dollar equivalent of $15.5 million (RMB 100 million). All proceeds from the Notes and the Loans will be used to complete Phases IV and V of the Erdos TCH Energy Saving Development Co., Ltd. (the “Erdos TCH”) project, a joint venture between Xi’an TCH and Erdos Metallurgy Co., Ltd. to recycle waste heat from Erdos Metallurgy’s refining plants to generate power and steam and sell them back to Erdos Metallurgy, as well as other working capital needs.

The term of the Loans with Jingu was for three years from the date of the first draw. The interest rate for the Loans is the People’s Bank of China’s (“PBOC”) three year loan base interest rate plus 2%. If the Loans are not exchanged for shares of the Common Stock of the Company as described below prior to maturity, Xi’an TCH will pay the difference between the interest rate described above and 18% on the outstanding amount. Under the Trust Loan Agreement and separate agreements entered by Jingu, Erdos TCH, Shanghai TCH, Xi’an TCH and Mr. Guohua Ku on August 18, 2010, Erdos TCH shall pledge the accounts receivable, equipment and assets of its Phases IV and V projects to Jingu as a guarantee to the Loans, Xi’an TCH shall pledge its 80% equity in Erdos TCH to Jingu as a guarantee to the Loans, Shanghai TCH provided a joint liability guarantee to Jingu for the Loans, and Mr. Guohua Ku provided his personal joint liability to Jingu for the Loans.

Under the Note Agreement with Cinda, the Notes were issued on or before August 18, 2011. The Notes have a three year maturity date from the date of the issuance of the first tranche. The exchange rate between RMB and US Dollar for each issue of Notes is the middle rate published by the PBOC for the second business day prior to each issuance. Each Note bears interest at a rate equal to that of PBOC base interest rate for the relevant interest period (the period commencing on and including January 1 of each year and ending on and including December 31 of such year) plus two percent (2%). If Cinda does not convert or fully convert the Notes to shares prior to maturity, the Company will pay the difference between the interest rate described above and 18% on the outstanding amount.

As collateral for the Notes, Mr. Guohua Ku, the Chairman, CEO and a major shareholder of the Company, entered into a Share Pledge Agreement with Cinda, on August 18, 2010, to pledge 4,500,000 shares of the Company’s common stock held by him to secure the first Note. The Agreement also calls for an additional 4,500,000 shares of the Company’s common stock held by Mr. Ku to secure the second Note before its issuance. On December 30, 2010, the Company received $7,533,391 (RMB 50,000,000) from the first tranche of the Jingu Loans. On January 30, 2011, the Company received another $7,533,391 (RMB 50,000,000) from the first tranche convertible Note of Cinda.

On December 9, 2011, the Company, Cinda and Mr. Guohua Ku, the Chairman, CEO and a major shareholder of the Company entered into a Supplemental Agreement (the “Supplemental Agreement”). Under the terms of the Supplemental Agreement, the Company and Cinda terminated their respective obligations to sell and purchase the second tranche of convertible note under the Note Agreement which has a principal amount equal to the US Dollar equivalent of RMB 50 million. The Company and Cinda also agreed that the Company would redeem the outstanding convertible notes at the amount equivalent to RMB 25 million each on December 30, 2011 and November 30, 2012, respectively, plus accrued interest at 18% (the "Redemption Interest Rate") up to the applicable Redemption Date, minus any interest already accrued and paid (together with the Redemption Principal Amount, the "Redemption Price"). For any default in payment of the Redemption Price, the interest rate on the Redemption Principal Amount was the Redemption Interest Rate plus an additional 5% due on demand. The interest on the Redemption Principal Amount due on November 30, 2012 (the "*Second Redemption Principal Amount"*) accrued at 18%. Half of the amount owed was paid by the Company on June 20, 2012 and the remaining half was due on November 30, 2012; however, upon request from Cinda, the November 30, 2012 date was extended to a future date. Xi’an TCH redeemed $3.97 million (RMB 25 million) and paid interest of $1.13 million (RMB 7.14 million) on December 30, 2011. As of March 31, 2013, the repayment of the Cinda loan for the remaining $3.76 million and unpaid interest of $563,112 was, upon request from Cinda and per an oral agreement, extended from November 30, 2012 to a future date.

On December 9, 2011, Mr. Ku executed a Certificate for additional collateral to pledge an additional 1.5 million shares of the common stock of the Company that he owns as collateral to Cinda to secure the unpaid note. In addition, on December 9, 2011, Xi’an TCH and China Jingu International Trust Co. Ltd. (“Jingu”), also entered into a Supplemental Agreement (the “Jingu Agreement”) to the Capital Trust Loan Agreement. Under the terms of the Jingu Agreement, Xi’an TCH agreed to repay the entire outstanding RMB 50 million loan principal amount plus interests at 18% and related fees.

#### Financial Leasing

#### Financing Agreement- - Sale Lease-back transaction

On June 28, 2011, Xi’an TCH” entered into a Financing Agreement with Cinda Financial Leasing Co., Ltd. (the “Cinda Financial”), an affiliate of China Cinda (HK) Asset Management Co., Ltd. (the “Cinda HK”).

Under the Agreement, Xi’an TCH transferred its ownership of a set of 7MW steam turbine waste heat power generation systems (the “WHPG system currently used by Zhongbao”) and four furnaces and ancillary apparatus (the “Assets”) to Cinda Financial for $6.72 million (RMB 42.50 million), and Cinda Financial, in turn, leased the Assets to Xi’an TCH for five years with an overall leasing fee of $8.15 million (RMB 51.54 million), which is based upon the transfer cost and the benchmark interest rate for a five-year loan made by the People’s Bank of China (“PBOC”) (then 6.65%) plus 15% of that rate (which was 7.6475%). The interest rate will increase if the PBOC five-year benchmark interest rate increases but will remain the same if the benchmark rate decreases in the future. Xi’an TCH shall make pro rata quarterly payments to Cinda Financial for the leasing fees. Upon the completion of the leasing term, and the full payment of all leasing fees and other fees, Xi’an TCH can pay $676 (RMB 4,250) to acquire ownership of the Assets. The quarterly minimum payment is $0.41 million (RMB 2,594,998). In addition to the leasing fees, Xi’an TCH prepaid a one-time non-refundable leasing service charge of $0.40 million (RMB 2,550,000), which was amortized over five years, and a refundable security deposit of $0.34 million (RMB 2,125,000) to Cinda Financial. As of March 31, 2013, the Company made repayments of $2,897,334 to Cinda Financial.

### Commitments

#### Shanxi Datong Coal Group Power Generation Projects

In February 2011, Xi’an TCH signed a contract with Shanxi Datong Coal Group Steel Co., Ltd (the “Shanxi Datong”) to recycle gas and steam from groups of blast-furnaces and converter of Shanxi Datong’s metal refining plants to generate power. According to the contract, Xi’an TCH will install two 3MW TRT, one 15MW WGPG and two 1MW steam power generation systems, with a total of 23MW power capacity for an estimated total investment of $27.45 million (RMB 180 million). The lease term is 30 years. During the lease, Shanxi Datong will be responsible for operating the projects and pay service fee to Xi’an TCH. The service fee is based on an average of 8,000 electricity-generating hours per year and $0.05 (RMB 0.33) per kilowatt hour (“kWh”) for the first five years from the completion of each power generation station. For each of the leases, at the 6th year, 11th year and 21st year thereafter, the rate will be RMB 0.3 kWh, 0.27 kWh and 0.25 kWh, respectively. After 30 years, the units will be transferred to Shanxi Datong without any charge.

On February 28,2011, Xi’an TCH entered into an agreement with Xi’an Huaxin Energy Tech Co., Ltd (the contractor for construction) for the Shanxi Datong Coal projects of two 3MW TRT systems and one 15 MW WGPG systems as described above. The project was scheduled to be completed 12 months after construction commencement.

As of March 31, 2013, the Company has paid $21.40 million for the Shanxi Datong Coal Group Power Generation project. The Company is committed to pay an additional $7.89 million for the Shanxi Datong Coal Group Power Generation project. This project was previously halted due to a business reorganization of Shanxi Datong and a renegotiation of the power stations with Xi’an TCH to amend certain construction plans. The construction was resumed in April 2012 and the Company expects to complete this project by the middle of 2013.

## Market risk

As filed, 353 characters.

### Exchange Rate Risk

Our operations are conducted mainly in the PRC. As such, our earnings are subject to movements in foreign currency exchange rates when transactions are denominated in RMB, which is our functional currency. Accordingly, our operating results are affected by changes in the exchange rate between the U.S. dollar and those currencies.

## Controls and procedures

As filed, 4,008 characters.

### Disclosure Controls and Procedures

The Company maintains disclosure controls and procedures which are designed to provide reasonable assurance that information required to be disclosed in the Company’s periodic SEC reports is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to its principal executive officer and principal financial officer, as appropriate, to allow timely decisions regarding required disclosure. The Company’s management, with the participation of the Company’s Chief Executive Officer and Chief Financial Officer, has evaluated the effectiveness of the Company’s “disclosure controls and procedures,” as such term is defined in Rules 13a – 15(e) and 15d – 15(e) of the Securities Exchange Act of 1934 (“Exchange Act”) at the end of the period covered by the report.

Based upon that evaluation, our Chief Executive Officer and Chief Financial Officer concluded that, as of as of March 31, 2013, the Company’s disclosure controls and procedures were effective to provide reasonable assurance that (i) the information required to be disclosed by us in this Report was recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and (ii) information required to be disclosed by us in our reports that we file or submit under the Exchange Act is accumulated and communicated to our management, including our principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

### Changes in Internal Control Over Financial Reporting

With the participation of the Company’s management, including its Chief Executive Officer and Chief Financial Officer, the Company also conducted an evaluation of the Company’s internal control over financial reporting to determine whether any changes occurred during the Company’s fiscal quarter ended as of March 31, 2013, that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting. Based on such evaluation, management concluded that, as of the end of the period covered by this report, there have not been any changes in the Company’s internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) during the fiscal quarter to which this report relates that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

### Inherent Limitations on Effectiveness of Controls

Our management, including the Chief Executive Officer and Chief Financial Officer, does not expect that our disclosure controls or our internal control over financial reporting will prevent or detect all error and all fraud. A control system, no matter how well designed and operated, can provide only reasonable, not absolute, assurance that the control system’s objectives will be met. The design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. Further, because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that misstatements due to error or fraud will not occur or that all control issues and instances of fraud, if any, have been detected. The design of any system of controls is based in part on certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions. Projections of any evaluation of the effectiveness of controls to future periods are subject to risks. Over time, controls may become inadequate because of changes in conditions or deterioration in the degree of compliance with policies or procedures.

## Risk factors

As filed, 2,028 characters.

Other than as set forth below, there have been no material changes in our risk factors from those disclosed in Part I, Item 1A, of our Annual Report on Form 10-K as of and for the year ended December 31, 2012. An investment in our common stock involves various risks. When considering an investment in our company, you should consider carefully all of the risk factors described below and in our most recent Form 10-K. If any of those risks, incorporated by reference in this Form 10-Q, occur, the market price of our shares of common stock could decline and investors could lose all or part of their investment. These risks and uncertainties are not the only ones facing us and there may be additional matters that we are unaware of or that we currently consider immaterial. All of these could adversely affect our business, financial condition, results of operations and cash flows and, thus, the value of an investment in our company.

### Risks Related to Our Business Operations

***In recent years, the economy of China has experienced unprecedented growth. As a result of the global financial crisis, this growth has slowed in the last year, and if the growth of the economy continues to slow or if the economy contracts, our financial condition may be materially and adversely affected.***

The rapid growth of the PRC economy has historically resulted in widespread growth opportunities in industries across China. As a result of the global financial crisis and the inability of enterprises to gain comparable access to the same amounts of capital available in past years, there may be an adverse effect on the business climate and growth of private enterprise in the PRC. An economic slowdown could have an adverse effect on our financial condition. Further, if economic growth slows, and if, in conjunction, inflation is allowed to proceed unchecked, our costs would likely increase, and there can be no assurance that we would be able to increase our prices to an extent that would offset the increase in our expenses.

Filed May 15, 2013.