# Fabric.AI, Inc.: Form 10-K for the period ended Apr 30, 2013

- Company: [Fabric.AI, Inc.](/companies/fabc.md) (CIK 1086745)
- Form: 10-K
- Filed: 2013-07-29
- Accepted by EDGAR: Jul 29, 2013, 16:20 ET
- Period: 2013-04-30
- Accession: 0001144204-13-041652
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1086745/000114420413041652/v350442_10k.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1086745/000114420413041652/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2013-04-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 12 months, 2012-05-01 to 2013-04-30 | $42.3m | us-gaap:Revenues |
| Cost of revenue | 12 months, 2012-05-01 to 2013-04-30 | $29.9m | us-gaap:CostOfRevenue |
| Selling, general and administrative | 12 months, 2012-05-01 to 2013-04-30 | $11.6m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 12 months, 2012-05-01 to 2013-04-30 | −$2.5m | us-gaap:OperatingIncomeLoss |
| Interest expense | 12 months, 2012-05-01 to 2013-04-30 | $2.1m | us-gaap:InterestExpense |
| Income tax | 12 months, 2012-05-01 to 2013-04-30 | $758.1k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 12 months, 2012-05-01 to 2013-04-30 | −$6.9m | us-gaap:NetIncomeLoss |
| Diluted EPS | 12 months, 2012-05-01 to 2013-04-30 | −$6.95 | us-gaap:EarningsPerShareBasicAndDiluted |
| Operating cash flow | 12 months, 2012-05-01 to 2013-04-30 | −$3.2m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | at 2013-04-30 | $1.4m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2013-04-30 | $14.6m | us-gaap:AssetsCurrent |
| Total assets | at 2013-04-30 | $18.1m | us-gaap:Assets |
| Current liabilities | at 2013-04-30 | $15.1m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2013-04-30 | $19.1m | us-gaap:Liabilities |
| Long-term debt | at 2013-04-30 | $0 | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2013-04-30 | $1.1m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2013-04-30 | $2.4m | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2013-04-30 | −$1.8m | us-gaap:StockholdersEquity |

## Business

As filed, 37,105 characters.

This Annual Report on Form 10-K (including the section regarding Management's Discussion and Analysis of Financial Condition and Results of Operations) contains forward-looking statements regarding our business, financial condition, results of operations and prospects. Words such as "expects," "anticipates," "intends," "plans," "believes," "seeks," "estimates" and similar expressions or variations of such words are intended to identify forward-looking statements, but are not deemed to represent an all-inclusive means of identifying forward-looking statements as denoted in this Annual Report on Form 10-K. Additionally, statements concerning future matters are forward-looking statements.

Although forward-looking statements in this Annual Report on Form 10-K reflect the good faith judgment of our Management, such statements can only be based on facts and factors currently known by us. Consequently, forward-looking statements are inherently subject to risks and uncertainties and actual results and outcomes may differ materially from the results and outcomes discussed in or anticipated by the forward-looking statements. Factors that could cause or contribute to such differences in results and outcomes include, without limitation, those specifically addressed under the heading "Risks Factors” below, as well as those discussed elsewhere in this Annual Report on Form 10-K. Readers are urged not to place undue reliance on these forward-looking statements, which speak only as of the date of this Annual Report on Form 10-K. We file reports with the Securities and Exchange Commission (SEC). We make available on our website under "Investor Relations/SEC Filings," free of charge, our annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and amendments to those reports as soon as reasonably practicable after we electronically file such materials with or furnish them to the SEC. Our website address is www.wpcs.com. You can also read and copy any materials we file with the SEC at the SEC's Public Reference Room at 100 F Street, NE, Washington, DC 20549. You can obtain additional information about the operation of the Public Reference Room by calling the SEC at 1-800-SEC-0330. In addition, the SEC maintains an Internet site (www.sec.gov) that contains reports, proxy and information statements, and other information regarding issuers that file electronically with the SEC, including us.

We undertake no obligation to revise or update any forward-looking statements in order to reflect any event or circumstance that may arise after the date of this Annual Report on Form 10-K. Readers are urged to carefully review and consider the various disclosures made throughout the entirety of this Annual Report, which attempt to advise interested parties of the risks and factors that may affect our business, financial condition, results of operations and prospects.

This Annual Report on Form 10-K includes the accounts of WPCS International Incorporated (WPCS) and its wholly and majority-owned subsidiaries, as follows, collectively referred to as “we”, “us” or the "Company". United States-based subsidiaries include WPCS Incorporated, WPCS International – Suisun City, Inc. (Suisun City Operations), WPCS International – Lakewood, Inc. (Lakewood Operations), WPCS International – Hartford, Inc. (Hartford Operations), WPCS International – Trenton, Inc. (Trenton Operations), WPCS International – Seattle, Inc. (Seattle Operations), and WPCS International – Portland, Inc. (Portland Operations). International operations include WPCS Asia Limited, 60% of Taian AGS Pipeline Construction Co. Ltd. (China Operations), and WPCS Australia Pty Ltd, WPCS International – Brendale, Pty Ltd., and The Pride Group (QLD) Pty Ltd. (Pride), (collectively the Australia Operations).

### Overview

We are a global provider of design-build engineering services for communications infrastructure, with approximately 250 employees in five (5) operations centers on three continents. We provide our engineering capabilities including wireless communication, specialty construction and electrical power to a diversified customer base in the public services, healthcare, energy and corporate enterprise markets worldwide.

The global economy depends on efficient voice, data and video communication. Old communication infrastructure needs to be replaced and new technology needs to be implemented. We believe we have the design-build capabilities to address the demand. For communication infrastructure projects that are significant in scope, we have the ability to offer wireless communication, specialty construction and electrical power. Because we are technology independent, we can integrate multiple products and services across a variety of communication requirements. This gives our customers the flexibility to obtain the most appropriate solution for their communication needs on a cost effective basis. In wireless communication, we can design and deploy all types of wireless systems in a variety of applications. In specialty construction, we have provided services for basic energy. On the electrical power side, we are capable of all types of commercial and industrial electrical work including the integration of advanced building communications technology for voice and data, life safety, security and HVAC.

For the fiscal year ended April 30, 2013, we generated revenues from continuing operations of approximately $42.3 million, compared to $65.5 million for the fiscal year ended April 30, 2012. Our backlog at April 30, 2013 and 2012 was approximately $26.4 million and $23.6 million, respectively.

### Recent Developments

### Executive Management Changes

#### Andrew Hidalgo Separation

On July 24, 2013, we entered into a separation agreement (the Separation Agreement) with Andrew Hidalgo (Hidalgo), our President, Chief Executive Officer and a member of the board of directors. Pursuant to the Separation Agreement, Hidalgo will resign effective at the close of business on July 30, 2013 (the Termination Date), as the President, Chief Executive Officer and a member of the board of directors of the Company and from all officer and director positions with all of our subsidiaries.

Pursuant to the Separation Agreement, Hidalgo intends to submit an offer to us to acquire our subsidiaries located in Trenton, New Jersey and Australia (the Proposed Acquisitions). Between the Termination Date and the earlier of (1) October 1, 2013 or (2) the date of closing of the Proposed Acquisitions by Hidalgo (the Severance Period), we shall continue to pay Hidalgo his current base salary of $325,000 per year through our normal payroll process. At the end of the Severance Period, Hidalgo shall be entitled to receive a severance payment equal to Hidalgo’s salary from the Termination Date through the end of the term of his employment agreement (January 31, 2018) minus any payments made to Hidalgo during the Severance Period (the Severance Payment).

Hidalgo shall be entitled to apply the Severance Payment towards the purchase price of the Proposed Acquisitions, if successful. In the event that the Proposed Acquisitions are not completed by October 1, 2013, the Company and Hidalgo shall negotiate the payment terms of the Severance Payment.

#### Sebastian Giordano Appointment

Effective August 1, 2013, Sebastian Giordano (Giordano), a member of our board of directors, will be appointed as our Interim Chief Executive Officer.

Effective August 1, 2013, we will enter into a letter agreement (the Giordano Agreement) with Giordano to serve as Interim Chief Executive Officer on a part-time basis until a permanent chief executive officer is appointed. The Giordano Agreement can be terminated by either party upon 30 days prior notice. Pursuant to the Giordano Agreement, Giordano shall receive a monthly consulting fee of $10,833. In addition, upon our approving a new stock incentive plan, Giordano shall receive a grant of 30,000 shares of our common stock and Giordano shall be entitled to receive a discretionary bonus upon successful achievement of a merger or acquisition of the Company by another entity. We will also reimburse Giordano for all reasonable expenses in connection with his services to us.

### Reverse Stock Split

Effective May 28, 2013, we amended our Certificate of Incorporation, as amended, pursuant to which we effected a one-for-seven reverse split of our issued and outstanding shares of common stock (the Reverse Stock Split) and reduced the number of authorized shares of common stock by the same ratio, from 100 million to 14,285,715, by filing a Certificate of Amendment to the Certificate of Incorporation (the Certificate of Amendment) with the Secretary of State of Delaware to effectuate such amendment. The total issued and outstanding common stock was decreased from 6,954,766 shares to 993,538 shares. All share-related and per share information in this annual report have been adjusted to give effect to the Reverse Stock Split.

The purpose of the Reverse Stock Split was to raise the per share trading price of WPCS common stock to regain compliance with the $1.00 per share minimum bid price requirement for a continued listing on the NASDAQ Capital Market. In order to maintain the WPCS listing on the NASDAQ Capital Market, on or before June 24, 2013, our common stock was required to have a minimum closing bid price of $1.00 per share for a minimum of ten prior consecutive trading days, which compliance was achieved effective June 12, 2013.

### Secured Note and Warrant Financing

On December 4, 2012, we entered into a Securities Purchase Agreement (the Purchase Agreement) with six accredited investors (the Buyers) pursuant to which, we sold an aggregate of (i) $4,000,000 principal amount of senior secured convertible notes (the Notes) and (ii) warrants (the Warrants) to purchase 2,274,796 shares of the our common stock (Common Stock), to the Buyers for aggregate gross proceeds of $4,000,000 (the Financing). The closing of the Financing was completed on December 5, 2012 (the Closing Date).

Pursuant to the terms of the Notes, we deposited the initial funds received from the Financing, minus $2,178,516, (the Initial Lending Amount) into an account (the Lockbox Account) controlled by Worldwide Stock Transfer, LLC (the Collateral Agent), as collateral agent on behalf of the Buyers. In addition, all payments of accounts receivable of the Company (and its domestic subsidiaries) shall be deposited into the Lockbox Account. We are permitted to receive from the Lockbox Account, on a daily basis, such amount of cash equal to: (A) (i) cash balance in the Lockbox Account plus (ii) 95% of available qualified accounts receivable minus (iii) $250,000 minus (B) amount of principal, accrued interest, fees, costs and expenses owed pursuant to the Notes. The Notes contain certain customary representations and warranties, affirmative and negative covenants and events of default. The principal covenant is that we shall maintain a current ratio of not less than 0.6 to 1.0 as of the last calendar day of each month. As of April 30, 2013, we are in compliance with these covenants.

On January 27, 2012, WPCS and its United States-based subsidiaries Suisun City Operations, Seattle Operations, Portland Operations, Hartford Operations, Lakewood Operations, and Trenton Operations (collectively, the Subsidiaries), entered into a loan and security agreement (the Credit Agreement) with Sovereign Bank, N.A. (Sovereign). We used the Initial Lending Amount to repay the existing loan of $2,000,000, plus $78,516 of interest accrued and fees and expenses to Sovereign, which Credit Agreement was terminated in connection with the Financing, and $100,000 for Buyer legal fees in connection with the Notes.

Pursuant to the Purchase Agreement, we agreed to use our reasonable best efforts to obtain Stockholders’ Approval at the annual stockholder meeting for the issuance of all of the securities issuable pursuant to the Purchase Agreement. Prior to Stockholder Approval, the Buyers were prohibited from converting the Notes and/or exercising the Warrants and receiving shares of our Common Stock, in the aggregate, such that the number of shares of Common Stock issued upon such conversions and/or exercises exceeds 19.9% of the issued and outstanding shares of our Common Stock as of the Closing Date.

We obtained Stockholder Approval on February 28, 2013 (the Stockholder Approval Date). In addition, we obtained stockholders’ approval to increase our authorized shares of common stock from 3,571,429 to 14,285,715 and recorded an amendment to our articles of incorporation on March 4, 2013. As a result of the amendment, we expect to have sufficient common stock to fulfill our conversion obligations under the Purchase Agreement, and the Buyers are permitted to convert the Notes and/or exercise the Warrants in excess of 19.9% of the issued and outstanding shares of our Common Stock at a price that is less than the greater of book or market value.

The Notes were initially convertible into shares of Common Stock at a conversion price of $2.6376 per share (the Conversion Price). The Conversion Price will be adjusted to 85% of the average of the closing bid prices for the five consecutive trading dates immediately prior to the following adjustment dates: (1) the earlier of the effective date of a registration statement or six months after closing (the First Adjustment); (2) the later of the date that is three months after the First Adjustment or one year after closing; and (3) on the Stockholder Approval Date.

On the Stockholder Approval Date, the Conversion Price was adjusted to $2.1539 per share. There was no adjustment to the Conversion Price on the First Adjustment date. The Warrants are exercisable for a period of five years from the Closing Date at an initial exercise price of $3.2970 per share (the Exercise Price). The Exercise Price is subject to the same adjustments as provided in the Notes as described above, and as a result, the Exercise Price was adjusted to $2.1539 per share on the Stockholder Approval Date. As of the date of this annual report, none of the Notes or Warrants have been converted or exercised, accordingly.

### Zurich Forbearance Agreement

On July 12, 2012, we executed a Surety Financing and Confession of Judgment Agreement (the Financing Agreement) with Zurich American Insurance Company (Zurich). Under the terms of the Financing Agreement, Zurich advanced us $793,927 to assist in the completion of the project contract with the Camden County Improvement Authority for work at the Cooper Medical Center of Rowan University (the Owner or Cooper Project), a $16.2 million project completed by our Trenton Operations. We were to repay Zurich the financial advances by September 2012, however we were in default under the terms of the Financing Agreement as we did not repay Zurich the $793,927, and Zurich paid certain of the our vendors pursuant to Zurich’s obligations under its payment bond on the Cooper Project. In addition, we are contingently liable to Zurich and its affiliate Fidelity and Deposit Company of Maryland (F&D) under a General Agreement of Indemnity (the Indemnity Agreement). Zurich and F&D, as surety, have issued certain performance and payment bonds on behalf of owners or customers regarding the Company’s work on various projects under the Indemnity Agreement. We agree to indemnify the surety for any payments made by Zurich on contracts of suretyship, guaranty or indemnity.

On April 17, 2013, we executed a Surety Forbearance and Confession of Judgment Agreement (the Forbearance Agreement) with Zurich, which supersedes the Financing Agreement. As of April 16, 2013, the total amount of claim losses, expenses and unpaid premiums due Zurich under the Forbearance Agreement less payments received by Zurich was $2,836,668 (the Loss Amount). Under the Forbearance Agreement, among other things, the parties have agreed to the following payments which will be credited against the Loss Amount owed to Zurich by us: (1) we shall make monthly payments to Zurich of $25,000 due upon the fifth of each month, up to and including December 5, 2013 (the Interim Liability Payments); (2) Zurich is to receive any and all amounts due under the contracts for which Zurich has issued one or more bonds (the Customer Payments); and (3) we shall assign and transfer and grant a security interest to Zurich in the proceeds of any claim against the Owner (the Claim), up to the Loss Amount as it exists at the time. As of April 30, 2013, the net Loss Amount owed Zurich under the Forbearance Agreement was $1,743,986, and is classified as Other Payable on our consolidated balance sheets. As of the date of this annual report, the Loss Amount owed to Zurich is approximately $1,634,000 following Interim Liability and Customer Payments made subsequent to April 30, 2013.

Each or any of the following shall constitute an event of default under the Forbearance Agreement: (a) failure by us to make any of the Interim Liability Payments; (b) failure by us to remit any Customer Payments received; (c) the failure by us or the Owner to remit the proceeds of the Claim to Zurich; and (d) any Loss Amount that still exists as of December 31, 2013. We are currently in compliance with the terms of the Forbearance Agreement.

We have submitted a revised Claim and request for equitable adjustment to the Owner in the amount of $2,421,425 for significant delays, disruptions and construction changes that were beyond its control and required the Company to perform additional work. We are currently in negotiations with the Owner to settle the Claim. The next step in the resolution process as set forth in the contract with the Owner is mandatory non-binding mediation through the American Arbitration Association (AAA). On April 15, 2013, we filed a Request for Mediation (the Mediation) with the AAA with regard to the Claim. We are awaiting a response from the Owner, and as such no date has been established for the Mediation. If we are successful in the settlement of this Claim we expect to use the proceeds from the Claim to repay Zurich the Loss Amount as it exists at the time. There can be no assurance that we will be successful in settling with the Owner for all or a portion of the submitted claim.

### Sale of Hartford and Lakewood Operations

On July 25, 2012, we and the Hartford and Lakewood Operations entered into an asset purchase agreement (the Asset Purchase Agreement), pursuant to which the Hartford and Lakewood Operations sold substantially all of their assets and liabilities to two newly-created subsidiaries of Kavveri Telecom Products Limited (Kavveri) for a purchase price of $5.5 million in cash, subject to adjustment and assumption of various liabilities. At closing, we received $4.9 million in cash, and the remaining $600,000 of the purchase price was to be placed into escrow pursuant to the Asset Purchase Agreement. We used the proceeds from this sale to repay the full amount outstanding under the Credit Agreement of $4,022,320 as of July 25, 2012. The difference of $877,680 was deposited in our operating cash account.

The parties agreed to place $350,000 of the purchase price into escrow pending assignment of certain contracts post-closing, with us receiving those funds upon successful assignment of the contracts. The remaining $250,000 was to be escrowed for purposes of satisfying certain adjustments to the purchase price based on a final net asset valuation to be completed after closing as well as repurchase obligations of certain delinquent accounts receivable. No later than three days after the final determination of the net asset valuation, the purchasers are required to deposit the $600,000 into escrow. To date, the Company has not reached agreement with Kavveri with regard to resolving the net asset valuation. On January 28, 2013, Kavveri submitted a revised aggregate claim for indemnification by us of approximately $1,511,000 with regard to (1) net asset valuation claim owed of approximately $698,000, which included accounts receivable deemed uncollectible of $519,000 related to a project that was completed by our former Hartford Operations and accepted by the customer on or prior to the Closing Date; and (2) delinquent account receivables to be repurchased of approximately $813,000.

On February 27, 2013, we notified Kavveri that we disputed these claims. Among other things, we dispute the amount of the delinquent receivables, and believe that after consideration of reserves for uncollectible accounts and other offsets previously considered in its calculation of the net asset valuation, the total amount of accounts receivable deemed uncollectible for repurchase to be approximately $36,000. However, we contend that Kavveri missed the deadline to notify us regarding the repurchase of delinquent receivables pursuant to the terms of the Asset Purchase Agreement regarding timing for notification to us, which would eliminate any repurchase payment owed by us to Kavveri. We also believe that the $519,000 of accounts receivable claimed for indemnification by Kavveri is without merit. Finally, we also dispute the net asset valuation claim, and believe Kavveri owes us approximately $58,000, following our evaluation of the uncollectible accounts receivable. With regard to the net asset valuation claim, if the parties disagree, and if they are unable to come to an agreement, the matter will be submitted to one or more independent, nationally-recognized accounting firms for final determination. As of the date of this annual report, no matters have been submitted to an independent accounting firm.

All operating results disclosed in this annual report only include the results from continuing operations, and exclude the results for the St. Louis and Sarasota Operations divested in September 2011, and the Hartford and Lakewood Operations asset sale, each of which are presented as discontinued operations. The Sarasota, Lakewood and Hartford Operations were previously reported in the wireless communications segment and the St. Louis Operation was reported in the specialty construction segment. We have also combined the management and operations of the Seattle and Portland Operations for efficiency.

### Industry Trends

We focus on markets such as public services, healthcare, energy and international which continue to show growth potential.

- *Public services*. We provide communications infrastructure for public services which include utilities, education, military and transportation infrastructure. We believe there is an active market for communications infrastructure in the public service sector due to the need to create cost efficiencies through the implementation of new communications technology.
- *Healthcare*. We provide communications infrastructure for hospitals and medical centers. In the healthcare market, the aging population is resulting in demands for upgraded and additional hospital infrastructure. New construction and renovations are occurring for hospitals domestically and internationally. In addition, there is a need to reduce the cost of delivering healthcare by implementing new communications technology. Our services include electrical power, structured cabling, security systems, life safety systems, environmental controls and communication systems.
- *Energy*. We provide communications infrastructure for petrochemical, natural gas and electric utility companies as well as renewable energy systems for various entities. The need to deliver basic energy more efficiently and to create new energy sources is driving the growth in energy construction. This creates opportunities to upgrade and deploy new communications technology and design and build renewable energy solutions.
- *International*. We provide communications infrastructure internationally for a variety of companies and government entities. China is spending on building its internal infrastructure and Australia is upgrading their infrastructure. Both China and Australia have experienced positive GDP growth rates. The total international revenue was approximately 30.5% and 28.1 % for the years ended April 30, 2013 and 2012, respectively.

### Business Strategy

Our goal is to become the recognized design-build engineering leader for communications infrastructure on a global scale. We believe that our geographic coverage and repeat customer base present the opportunity to grow from a revenue and earnings perspective. Specifically, we will endeavor to:

- *Provide additional services for our customers.* We seek to expand our customer relationships by making them aware of the diverse products and services we offer. We believe that providing these customers the full range of our services will lead to new revenue producing projects and increased profitability.
- *Maintain and expand our focus in strategic markets.* We have designed and deployed successful and innovative communications infrastructure solutions for multiple customers in a number of strategic markets, such as public services, healthcare, energy and corporate enterprise. We will continue to seek additional customers in these targeted markets and look for new ways in which we can design and deploy communications infrastructure for increased productivity.
- *Strengthen our relationships with technology providers.* We will continue to strengthen the relationships we have with technology providers. These companies rely on us to deploy their technology products. We have worked with these providers in testing new communications technology. Our technicians are trained and maintain certifications on a variety of leading communications technology products which exhibits our commitment in providing advanced solutions for our customers.

### Design-Build Services

Historically, we have operated in three business segments: wireless communication; specialty construction; and electrical power. As part of the divestiture transactions described above, we reclassified the reporting units within our reportable segments. As a result, wireless communications includes the Suisun City and Australia Operations, specialty construction includes the China Operations, and electrical power includes Trenton, Seattle and Portland Operations, for each of the periods presented. For the fiscal year ended April 30, 2013, wireless communication represented approximately 41.7% of our total revenue, specialty construction represented approximately 12.4% of our total revenue and electrical power represented approximately 45.9% of our revenue. For the fiscal year ended April 30, 2012, wireless communication represented approximately 35.6% of our total revenue, specialty construction represented approximately 9.3% of our total revenue and electrical power represented approximately 55.1% of our revenue.

#### Wireless Communication

Throughout the community or around the world, in remote and urban locations, wireless networks provide the connections that keep information flowing. The design and deployment of a wireless network solution requires an in-depth knowledge of radio frequency engineering so that wireless networks are free from interference with other signals and amplified sufficiently to carry data, voice or video with speed and accuracy. We have extensive experience and methodologies that are well suited to address these challenges for our customers. We are capable of designing wireless networks and providing the technology integration necessary to meet goals for enhanced communication, increased productivity and reduced costs. We have the engineering expertise to utilize all facets of wireless technology or combination of various technologies to develop a cost effective network for a customer's wireless communication requirements. This includes Wi-Fi networks, point-to-point systems, mesh networks, microwave systems, cellular networks, in-building systems and two-way communication systems.

With the divestiture of the Hartford and Lakewood Operations, we have performed less project work in the police, fire, and emergency dispatch markets. However, we will continue to provide wireless communications services through our remaining operations in markets such as utilities, education, military and transportation infrastructure, as part of the services we provide in our other operations.

#### Specialty Construction

With the development of communities and industry, pipeline services are an integral part of the infrastructure process. We have expertise in the construction and maintenance of pipelines in our China Operations for natural gas and petroleum transmission. This includes experience in transmission infrastructure, horizontal directional drilling and rock trenching. In addition, we offer trenching services for power lines, telecommunications and water lines. Our services are performed with minimal ground disruption and environmental impact.

#### Electrical Power

Electrical power transmission and distribution networks built years ago often cannot fulfill the growing technological needs of today's end users. We provide complete electrical contracting services to help commercial and industrial facilities of all types and sizes to upgrade their power systems. Our capabilities include power transmission, switchgear, underground utilities, outside plant, instrumentation and controls. We provide an integrated approach to project coordination that creates cost-effective solutions. In addition, corporations, government entities, healthcare organizations and educational institutions depend on the reliability and accuracy of voice, data and video communications. However, the potential for this new technology cannot be realized without the right electrical infrastructure to support the convergence of technology. In this regard, we create integrated building systems, including the installation of advanced structured cabling systems and electrical networks. We support the integration of renewable energy, telecommunications, life safety, security and HVAC in an environmentally safe manner and design for future growth by building in additional capacity for expansion as new capabilities are added.

### Project Characteristics

Our contracts are primarily service-based projects providing installation and engineering services, which include providing labor, materials and equipment for a complete installation. The projects are generally staffed with a project manager who manages multiple projects and a field supervisor who is responsible for an individual project. Depending on the scope of the contract, project staff size could range from two to four engineers to as high as 25 to 30 engineers. A project may also include subcontracted services along with our direct labor. The project manager coordinates the daily activities of direct labor and subcontractors and works closely with our field supervisors. Project managers are responsible for job costing, change order tracking, billing, and customer relations. Executive management monitors the performance of all projects regularly through work-in-progress reporting or percentage-of-completion, and reviews this information with each project manager. Our projects are primarily executed on a contract basis. These contracts can be awarded through a competitive bidding process, an informal bidding process, or a simple quote request. Upon award of a contract, there can be delays of several months before work begins. The active work time on our projects can range in duration from a few days up to as long as two years.

### Customers

We serve a variety of public services, healthcare, energy and corporate enterprise customers. For the fiscal years ended April 30, 2013 and 2012, there was one customer in our Trenton Operations, the Cooper Project, which accounted for 13.6% and 15.5% of our revenue, respectively.

### Sales and Marketing

We have dedicated sales and marketing resources that develop opportunities within our existing customer base, and identify new customers through our strategic market focus and our relationships with technology providers. In addition, our project managers devote a portion of their time to sales and marketing. When an opportunity is identified, we assess the opportunity to determine our level of interest in participation. After qualifying an opportunity, our sales and marketing resources work with the internal project management teams to prepare a cost estimate and contract proposal for a particular project. We keep track of bids submitted and bids that are awarded. Once a bid is awarded to us, it is assigned to a project management team and included in our backlog.

### Backlog

As of April 30, 2013, we had a backlog of unfilled orders of approximately $26.4 million compared to approximately $23.6 million at April 30, 2012. We define backlog as the value of work-in-hand to be provided for customers as of a specific date where the following conditions are met (with the exception of engineering change orders): (i) the price of the work to be done is fixed; (ii) the scope of the work to be done is fixed, both in definition and amount; and (iii) there is an executed written contract, purchase order, agreement or other documentary evidence which represents a firm commitment by the customer to pay us for the work to be performed. These backlog amounts are based on contract values and purchase orders and may not result in actual receipt of revenue in the originally anticipated period or at all. We have experienced variances in the realization of our backlog because of project delays or cancellations resulting from external market factors and economic factors beyond our control and we may experience such delays or cancellations in the future. Backlog does not include new firm commitments that may be awarded to us by our customers from time to time in future periods. These new project awards could be started and completed in this same future period. Accordingly, our backlog does not necessarily represent the total revenue that could be earned by us in future periods.

### Competition

We face competition from numerous service organizations, ranging from small independent regional firms to larger firms servicing national markets. Historically, there have been relatively few significant barriers to entry into the markets in which we operate, and, as a result, any organization that has adequate financial resources and access to technical expertise may become a competitor. At the present time, we believe that there are no dominant competitors in the communications infrastructure market, but we would classify Quanta Services, Inc. (NYSE:PWR), Dycom Industries, Inc. (NYSE:DY) and MasTec, Inc. (NYSE:MTZ) as national competitors. In Australia and China, we believe there are no dominant competitors, and our competition is primarily from regional contractors in these geographic locations. The principal competitive advantage in these markets is establishing a reputation of delivering projects on time and within budget. Other factors of importance include accountability, engineering capability, certifications, project management expertise, industry experience and financial strength. We believe that the ability to provide comprehensive communications infrastructure design-build services including wireless communication, specialty construction and electrical power gives us a competitive advantage. We maintain a trained and certified staff of engineers that have developed proven methodologies for the design and deployment of communications infrastructure, and can provide these services on an international basis. In addition, we offer both a union and non-union workforce that allow us to bid on either labor requirement, creating yet another competitive advantage. However, our ability to compete effectively also depends on a number of additional factors that are beyond our control. These factors include competitive pricing for similar services and the ability and willingness of the competition to finance projects on favorable terms.

### Employees

As of April 30, 2013, we employed 250 full time employees, of whom 178 are project engineers and technicians, 19 are project managers, 50 are in administration and sales and three are executives. Approximately 63% of the project engineers are represented by the International Brotherhood of Electrical Workers. We also have non-union employees. We believe we have excellent relations with all of our employees. We have 112 union employees who are covered by contracts that expire at various times as follows:

| Operations | # of Employees | Union Contract Expiration Date |
| --- | ---: | --- |
| Trenton | 5 | Effective until cancelled with 150 days notice |
| Seattle | 22 | May 31, 2015 |
|  | 2 | August 31, 2015 |
|  | 1 | June 30, 2015 |
|  | 27 | May 31, 2014 |
|  | 14 | July 31, 2014 |
| Suisun City | 40 | November 30, 2014 |
|  | 1 | May 31, 2014 |
| Total Union Employees | 112 |  |

9

## Risk factors

As filed, 38,054 characters.

**The report of our independent registered public accounting firm contains an emphasis paragraph that indicates there is substantial doubt concerning our ability to continue as a going concern as a result of our recurring losses from operations, working capital deficiencies and the Zurich Forbearance Agreement.**

Our audited consolidated financial statements for the fiscal years ended April 30, 2013 and 2012 were prepared on a going concern basis in accordance with GAAP. The going concern basis of presentation assumes that we will continue in operation and be able to realize our assets and discharge our liabilities and commitments in the normal course of business. In order for us to continue operations beyond the next twelve months we must be able discharge our liabilities and commitments in the normal course of business; generate operating income; reduce operating expenses; produce cash from our operating activities, repay or modify the terms of the Zurich Forbearance Agreement, settle the Claim with the Owner, and potentially raise additional funds to meet our working capital needs. We cannot guarantee that we will be able to generate operating income, reduce operating expenses, produce cash from our operating activities, repay or modify the Zurich Forbearance Agreement or obtain additional funds through either debt or equity financing transactions or settle the Claim, or that such funds, if available, will be obtainable on satisfactory terms. If we are unable to reduce operating expenses, produce cash from our operating activities, repay or modify the Zurich Forbearance Agreement, or obtain additional funds through either debt or equity financing transactions or settle the Claim, we may be unable to continue to fund our operations, provide our services or realize value from our assets and discharge our liabilities in the normal course of business. These uncertainties raise substantial doubt about our ability to continue as a going concern. If we become unable to continue as a going concern, we may have to liquidate our assets, and might realize significantly less than the values at which they are carried on our consolidated financial statements, and stockholders may lose all or part of their investment in our common stock. The accompanying financial statements do not contain any adjustments as a result of this uncertainty.

**Our Notes impose restrictions on us which may prevent us from engaging in transactions that might benefit us, including responding to changing business and economic conditions or securing additional financing, if needed.**

The terms of our indebtedness contain customary events of default and covenants that prohibit us from taking certain actions without satisfying certain financial tests or obtaining the consent of the lenders. The prohibited actions include, among other things:

- buying back shares in excess of specified amounts;
- making investments and acquisitions in excess of specified amounts;
- incurring additional indebtedness in excess of specified amounts;
- paying cash dividends;
- creating certain liens against our assets;
- prepaying subordinated indebtedness;
- engaging in certain mergers or combinations; and
- engaging in transactions that would result in a “change of control”.

**If we fail to accurately estimate costs associated with our fixed-price contracts using percentage-of-completion, our actual results may vary from our assumptions, which may reduce our profitability or impair our financial performance.**

A substantial portion of our revenue is derived from fixed price contracts. Under these contracts, we set the price of our services on an aggregate basis and assume the risk that the costs associated with our performance may be greater than we anticipated. We recognize revenue and profit on these contracts as the work on these projects progresses on a percentage-of-completion basis. Under the percentage-of-completion method, contracts in process are valued at cost plus accrued profits less earned revenues and progress payments on uncompleted contracts.

The percentage-of-completion method therefore relies on estimates of total expected contract costs. These costs may be affected by a variety of factors, such as lower than anticipated productivity, conditions at work sites differing materially from what was anticipated at the time we bid on the contract and higher costs of materials and labor. Contract revenue and total cost estimates are reviewed and revised monthly as the work progresses, such that adjustments to profit resulting from revisions are made cumulative to the date of the revision. Adjustments are reflected in contract revenue for the fiscal period affected by these revised estimates. If estimates of costs to complete long-term contracts indicate a loss, we immediately recognize the full amount of the estimated loss. Such adjustments and accrued losses could result in reduced profitability and liquidity.

For example, our Trenton Operations experienced significant adjustments to expected profits on four projects during the 2012 fiscal year, which significantly impacted our consolidated financial results for the year ended April 30, 2012. Cost estimates are reviewed regularly on a contract-by-contract basis, and are revised periodically throughout the life of the contract such that adjustments are made cumulative to the date of the revision. The cost estimates and related costs incurred for these four projects increased significantly during fiscal 2012. In particular, the most significant of these projects is an electrical project that was awarded to the Trenton Operations with a contract value of approximately $16.2 million. The total cost of this project was approximately $20.6 million. The fiscal 2012 effect of the revisions in estimated profit on this project resulted in a decrease in gross profit of approximately $6.0 million, and the decrease in gross profit on the other three projects totaled approximately $3.2 million, for an aggregate gross profit reduction of $9.2 million on these projects for the fiscal year ended April 30, 2012.

### Failure to properly manage projects may result in unanticipated costs or claims.

Our project engagements may involve large scale, highly complex projects. The quality of our performance on such projects depends in large part upon our ability to manage the relationship with our customers, and to effectively manage the project and deploy appropriate resources, including third-party contractors and our own personnel, in a timely manner. Any defects or errors or failure to meet customers’ expectations could result in claims for substantial damages against us. Our contracts generally limit our liability for damages that arise from negligent acts, errors, mistakes or omissions in rendering services to our customers. However, we cannot be sure that these contractual provisions will protect us from liability for damages in the event we are sued. In addition, in certain instances, we guarantee customers that we will complete a project by a scheduled date or that the network will achieve certain performance standards. If the project or network experiences a performance problem, we may not be able to recover the additional costs we would incur, which could exceed revenues realized from a project.

**The ongoing economic downturn and instability in the financial markets may adversely impact our customers’ future spending as well as payment for our services and, as a result, our operations and growth.**

The U.S. economy is still recovering from the recent recession, and growth in economic activity has slowed substantially. In addition, the Australia Operations has experienced a slowing in revenue growth due to uncertainties in government spending as a result of changes in political party and related economic activity. It is uncertain when these conditions will significantly improve. Stagnant or declining economic conditions have adversely impacted the demand for our services and resulted in the delay, reduction or cancellation of certain projects and may continue to adversely affect us in the future. Additionally, our customers may finance their projects through the incurrence of debt or the issuance of equity. The availability of credit remains constrained, and many of our customers’ equity values have not fully recovered from the negative impact of the recession. A reduction in cash flow or the lack of availability of debt or equity financing may continue to result in a reduction in our customers’ spending for our services and may also impact the ability of our customers to pay amounts owed to us, which could have a material adverse effect on our operations and our ability to grow at historical levels.

**An economic downturn in any of the industries we serve may lead to less demand for our services.**

Because the vast majority of our revenue is derived from a few industries, a downturn in any of those industries would adversely affect our results of operations. Specifically, an economic downturn in any industry we serve could result in the delay, reduction or cancellation of projects by our customers as well as cause our customers to outsource less work, resulting in decreased demand for our services and potentially impacting our operations and our ability to grow at historical levels. A number of other factors, including financing conditions and potential bankruptcies in the industries we serve or a prolonged economic downturn or recession, could adversely affect our customers and their ability or willingness to fund capital expenditures in the future or pay for past services. For example, our wireless communication segment has been negatively impacted since mid-2008 by the slowdown in spending for public services projects at the state and local government level, resulting in reductions, delays or postponements of these projects, and we expect this slowdown will likely continue, at least in the near-term. Consolidation, competition, capital constraints or negative economic conditions in the public services, healthcare and energy industries may also result in reduced spending by, or the loss of, one or more of our customers.

**We have a significant amount of accounts receivable and costs and estimated earnings in excess of billings assets.**

We extend credit to our customers as a result of performing work under contract prior to billing our customers for that work. At April 30, 2013, we had net accounts receivable of approximately $8.4 million and costs and estimated earnings in excess of billings of $1.1 million. We periodically assess the credit risk of our customers and continuously monitor the timeliness of payments. Slowdowns in the industries we serve may impair the financial condition of one or more of our customers and hinder their ability to pay us on a timely basis or at all. Further, bankruptcies or financial difficulties within the markets we serve could hinder the ability of our customers to pay us on a timely basis or at all, reducing our cash flows and adversely impacting our liquidity and profitability. Additionally, we could incur losses in excess of current bad debt allowances.

**The industry in which we operate has relatively low barriers to entry and increased competition could result in margin erosion, which would make profitability even more difficult to sustain.**

Other than the technical skills required in our business, the barriers to entry in our business are relatively low. We do not have any intellectual property rights to protect our business methods and business start-up costs do not pose a significant barrier to entry. The success of our business is dependent on our employees, customer relations and the successful performance of our services. If we face increased competition as a result of new entrants in our markets, we could experience reduced operating margins and loss of market share and brand recognition.

**Our business depends upon our ability to keep pace with the latest technological changes, and our failure to do so could make us less competitive in our industry.**

The market for our services is characterized by rapid change and technological improvements. Failure to respond in a timely and cost-effective way to these technological developments may result in serious harm to our business and operating results. We have derived, and we expect to continue to derive, a substantial portion of our revenues from design-build services that are based upon today’s leading technologies and that are capable of adapting to future technologies. As a result, our success will depend, in part, on our ability to develop and market service offerings that respond in a timely manner to the technological advances of our customers, evolving industry standards and changing preferences.

**Our failure to attract and retain engineering personnel or maintain appropriate staffing levels could adversely affect our business.**

Our success depends upon our attracting and retaining skilled engineering personnel. Competition for such skilled personnel in our industry is high and at times can be extremely intense, especially for engineers and project managers, and we cannot be certain that we will be able to hire sufficiently qualified personnel in adequate numbers to meet the demand for our services. We also believe that our success depends to a significant extent on the ability of our key personnel to operate effectively, both individually and as a group. Additionally, we cannot be certain that we will be able to hire the requisite number of experienced and skilled personnel when necessary in order to service a major contract, particularly if the market for related personnel is competitive. Conversely, if we maintain or increase our staffing levels in anticipation of one or more projects and the projects are delayed, reduced or terminated, we may underutilize the additional personnel, which could reduce our operating margins, reduce our earnings and possibly harm our results of operations. If we are unable to obtain major contracts or effectively complete such contracts due to staffing deficiencies, our revenues may decline and we may experience continued losses.

**Acquisitions involve risks that could result in a reduction of our operating results, cash flows and liquidity.**

We have made, and in the future may continue to make strategic acquisitions. However, we may not be able to identify suitable acquisition opportunities, or may be unable to obtain the consent of our lender and therefore, may not be able to complete such acquisition. We may pay for acquisitions with our common stock or with convertible securities, which may dilute your investment in our common stock, or we may decide to pursue acquisitions that investors may not agree with. In connection with most of our acquisitions, we have also agreed to substantial earn-out arrangements. To the extent we defer the payment of the purchase price for any acquisition through a cash earn-out arrangement, it will reduce our cash flows in subsequent periods. In addition, acquisitions may expose us to operational challenges and risks, including:

- the ability to profitably manage acquired businesses or successfully integrate the acquired business’ operations and financial reporting and accounting control systems into our business;
- increased indebtedness and contingent purchase price obligations associated with an acquisition;
- the ability to fund cash flow shortages that may occur if anticipated revenue is not realized or is delayed, whether by general economic or market conditions, or unforeseen internal difficulties;
- the availability of funding sufficient to meet increased capital needs;
- diversion of management’s attention; and
- the ability to retain or hire qualified personnel required for expanded operations.

Completing acquisitions may require significant management time and financial resources because we may need to assimilate widely dispersed operations with distinct corporate cultures. In addition, acquired companies may have liabilities that we failed, or were unable, to discover in the course of performing due diligence investigations. We cannot assure you that the indemnification granted to us by sellers of acquired companies will be sufficient in amount, scope or duration to fully offset the possible liabilities associated with businesses or properties we assume upon consummation of an acquisition. We may learn additional information about our acquired businesses that materially adversely affect us, such as unknown or contingent liabilities and liabilities related to compliance with applicable laws. Any such liabilities, individually or in the aggregate, could have a material adverse effect on our business.

Failure to successfully manage the operational challenges and risks associated with, or resulting from, acquisitions could adversely affect our results of operations, cash flows and liquidity. Borrowings or issuances of convertible securities associated with these acquisitions may also result in higher levels of indebtedness which could impact our ability to service our debt within the scheduled repayment terms.

**Amounts included in our backlog may not result in actual revenue or translate into profits.**

As of April 30, 2013, we had a backlog of unfilled orders of approximately $26.4 million. This backlog amount is based on contract values and purchase orders and may not result in actual receipt of revenue in the originally anticipated period or at all. In addition, contracts included in our backlog may not be profitable. We have experienced variances in the realization of our backlog because of project delays or cancellations resulting from external market factors and economic factors beyond our control and we may experience delays or cancellations in the future. If our backlog fails to materialize, we could experience a further reduction in revenue, profitability and liquidity.

**Our business could be affected by adverse weather conditions, resulting in variable quarterly results.**

Adverse weather conditions, particularly during the winter season, could affect our ability to perform outdoor services in certain regions of the United States. As a result, we might experience reduced revenue in the third and fourth quarters of our fiscal year. Natural catastrophes could also have a negative impact on the economy overall and on our ability to perform outdoor services in affected regions or utilize equipment and crews stationed in those regions, which in turn could significantly impact the results of any one or more of our reporting periods.

**The Company’s success depends largely on the continued service and availability of key personnel.**

Much of the Company’s future success depends on the continued availability and service of key personnel, including its executive team. The Company’s current Chairman and Chief Executive Officer (CEO), Andrew Hidalgo, who has overseen our Company since inception, will resign effective July 30, 2013 and a temporary CEO has been appointed while the Company searches for a permanent CEO and Chairman. Until such a replacement is found, the Company will rely upon its Interim CEO and existing executive team. Experienced personnel in the telecommunications industry are in high demand and competition for their talents is intense. There can be no assurance that the Company will continue to attract and retain key personnel.

**Employee strikes and other labor-related disruptions may adversely affect our operations.**

Our business is labor intensive, with certain projects requiring large numbers of engineers. As of April 30, 2013, approximately 45% of our workforce was unionized, including 63% of our project engineers. Strikes or labor disputes with our unionized employees may adversely affect our ability to conduct our business. If we are unable to reach agreement with any of our unionized work groups on future negotiations regarding the terms of their collective bargaining agreements, or if additional segments of our workforce become unionized, we may be subject to work interruptions or stoppages. Any of these events could be disruptive to our operations and could result in negative publicity, loss of contracts and a decrease in revenues.

**Our business is labor intensive and we may be unable to attract and retain qualified employees.**

Our ability to maintain our productivity and profitability is limited by our ability to employ, train and retain the skilled personnel necessary to operate our business. We cannot be certain that we will be able to maintain the skilled labor force necessary to operate efficiently and support our growth strategy. Our ability to do so depends on a number of factors such as general rates of employment, competitive demands for employees having the skills we need and the level of compensation required to hire and retain qualified employees. In addition, we cannot be certain that our labor expenses will not increase as a result of shortages in the supply of these skilled personnel. As a result, our ability to attain productivity and profitability may be affected if we are unable to hire qualified employees and manage labor costs to retain employees.

**Legislative actions and initiatives relating to electric power, renewable energy and telecommunications may fail to result in increased demand for our services.**

Demand for our services may not result from renewable energy initiatives. While many states currently have mandates in place that require specified percentages of power to be generated from renewable sources, states could reduce those mandates or make them optional, which could reduce, delay or eliminate renewable energy development in the affected states. Additionally, renewable energy is generally more expensive to produce and may require additional power generation sources as backup. The locations of renewable energy projects are often remote and are not viable unless new or expanded transmission infrastructure to transport the power to demand centers is economically feasible. Furthermore, funding for renewable energy initiatives may not be available, which has been further constrained as a result of tight credit markets. These factors have resulted in fewer renewable energy projects than anticipated and a delay in the construction of these projects and the related infrastructure, which has adversely affected the demand for our services. These factors could continue to result in delays or reductions in projects, which could further negatively impact our business.

The Federal government provides for various stimulus programs, such as grants, loan guarantees and tax incentives, relating to renewable energy, energy efficiency and electric power and telecommunications infrastructure. Some of these programs have expired, which may affect the economic feasibility of future projects. Additionally, while a significant amount of stimulus funds have been awarded, we cannot predict the timing and scope of any investments to be made under stimulus funding or whether stimulus funding will result in increased demand for our services. Investments for renewable energy, electric power infrastructure and telecommunications fiber deployment under Federal programs may not occur, may be less than anticipated or may be delayed, any of which would negatively impact demand for our services.

Other current and potential legislative or regulatory initiatives may not result in increased demand for our services. Examples include legislation or regulation to require utilities to meet reliability standards, to ease sitting and right-of-way issues for the construction of transmission lines and to encourage installation of new electric power transmission and renewable energy generation facilities. It is not certain whether existing legislation will create sufficient incentives for new projects, when or if proposed legislative initiatives, will be enacted or whether any potentially beneficial provisions will be included in the final legislation.

There are also a number of legislative and regulatory proposals to address greenhouse gas emissions, which are in various phases of discussion or implementation. The outcome of Federal and state actions to address global climate change could negatively affect the operations of our customers through costs of compliance or restraints on projects, which could reduce their demand for our services.

**Increases in our health insurance costs could adversely impact our results of operations and cash flows.**

The costs of employee health care insurance have been increasing in recent years due to rising health care costs, legislative changes, and general economic conditions. Additionally, we may incur additional costs as a result of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively, the “Health Care Reform Laws”) that were signed into law in March 2010 and recently upheld by the U.S. Supreme Court. A continued rise in health care costs or additional costs as a result of the Health Care Reform Laws could have a negative impact on our financial position and results of operations.

### Our quarterly results fluctuate and may cause our stock price to decline.

Our quarterly operating results have fluctuated in the past and will likely fluctuate in the future. As a result, we believe that period to period comparisons of our results of operations are not a good indication of our future performance. A number of factors, many of which are beyond our control, are likely to cause these fluctuations. Some of these factors include:

- the timing and size of design-build projects and technology upgrades by our customers;
- fluctuations in demand for outsourced design-build services;
- the ability of certain customers to sustain capital resources to pay their trade account balances and required changes to our allowance for doubtful accounts based on periodic assessments of the collectability of our accounts receivable balances;
- reductions in the prices of services offered by our competitors;
- our success in bidding on and winning new business; and
- our sales, marketing and administrative cost structure.

Because our operating results may vary significantly from quarter to quarter, our operating results may not meet the expectations of securities analysts and investors, and our common stock could decline significantly which may expose us to risks of securities litigation, impair our ability to attract and retain qualified individuals using equity incentives and make it more difficult to complete acquisitions using equity as consideration.

**If our common stock is delisted from The NASDAQ Stock Market, the Company would be subject to the risks relating to penny stocks.**

If our common stock were to be delisted from trading on The NASDAQ Stock Market and the trading price of the common stock were below $5.00 per share on the date the common stock were delisted, trading in our common stock would also be subject to the requirements of certain rules promulgated under the Securities Exchange Act of 1934, as amended. These rules require additional disclosure by broker-dealers in connection with any trades involving a stock defined as a "penny stock" and impose various sales practice requirements on broker-dealers who sell penny stocks to persons other than established customers and accredited investors, generally institutions. These additional requirements may discourage broker-dealers from effecting transactions in securities that are classified as penny stocks, which could severely limit the market price and liquidity of such securities and the ability of purchasers to sell such securities in the secondary market. A penny stock is defined generally as any non-exchange listed equity security that has a market price of less than $5.00 per share, subject to certain exceptions.

**Our stock price may be volatile, which may result in lawsuits against us and our officers and directors.**

The stock market in general and the stock prices of technology and telecommunications companies in particular, have experienced volatility that has often been unrelated to or disproportionate to the operating performance of those companies. The market price of our common stock has fluctuated in the past and is likely to fluctuate in the future. Between May 1, 2012 and April 30, 2013, our common stock has traded as low as $2.07 and as high as $8.05 per share, based upon information provided by the NASDAQ Capital Market. Factors, which could have a significant impact on the market price of our common stock include, but are not limited to, the following:

- quarterly variations in operating results;
- announcements of new services by us or our competitors;
- the gain or loss of significant customers;
- changes in analysts’ earnings estimates;
- rumors or dissemination of false information;
- pricing pressures;
- short selling of our common stock;
- impact of litigation;
- general conditions in the market;
- changing the exchange or quotation system on which we list our common stock for trading;
- announcements regarding acquisitions by or of our company;
- political and/or military events associated with current worldwide conflicts; and
- events affecting other companies that investors deem comparable to us.

Companies that have experienced volatility in the market price of their stock have frequently been the object of securities class action litigation. Class action and derivative lawsuits could result in substantial costs to us and a diversion of our management’s attention and resources, which could materially harm our financial condition and results of operations.

**Future changes in financial accounting standards may adversely affect our reported results of operations.**

A change in accounting standards could have a significant effect on our reported results and may even affect our reporting of transactions completed before the change is effective. New pronouncements and varying interpretations of pronouncements have occurred and may occur in the future. Changes to existing rules or the questioning of current practices may adversely affect our reported financial results or the way we conduct our business.

**Compliance with changing regulation of corporate governance and public disclosure may result in additional expenses.**

Changing laws, regulations and standards relating to corporate governance and public disclosure, including the Sarbanes-Oxley Act of 2002 (SOX), newly enacted SEC regulations and NASDAQ Stock Market rules, have created additional burdens for companies such as ours. We are committed to maintaining high standards of corporate governance and public disclosure. As a result, we intend to invest appropriate resources to comply with evolving standards. This may result in increased general and administrative costs, including potential increased audit fees for SOX compliance, and a diversion of management time and attention from revenue-generating activities to compliance activities.

**We can issue shares of preferred stock without shareholder approval, which could adversely affect the rights of common shareholders.**

Our certificate of incorporation permits us to establish the rights, privileges, preferences and restrictions, including voting rights, of future series of our preferred stock and to issue such stock without approval from our stockholders. The rights of holders of our common stock may suffer as a result of the rights granted to holders of preferred stock that we may issue in the future. In addition, we could issue preferred stock to prevent a change in control of our company, depriving common shareholders of an opportunity to sell their stock at a price in excess of the prevailing market price.

**Certain provisions of our corporate governing documents could make an acquisition of our company more difficult.**

The following provisions of our certificate of incorporation and bylaws, as currently in effect, as well as Delaware law, could discourage potential proposals to acquire us, delay or prevent a change in control of us or limit the price that investors may be willing to pay in the future for shares of our common stock:

- our certificate of incorporation permits our Board of Directors to issue “blank check” preferred stock and to adopt amendments to our bylaws;
- our bylaws contain restrictions regarding the right of stockholders to nominate directors and to submit proposals to be considered at stockholder meetings;
- our certificate of incorporation and bylaws restrict the right of stockholders to call a special meeting of stockholders and to act by written consent; and
- we are subject to provisions of Delaware law which prohibit us from engaging in any of a broad range of business transactions with an “interested stockholder” for a period of three years following the date such stockholder became classified as an interested stockholder.

**Risks associated with operating in international markets could restrict our ability to expand globally and harm our business and prospects, and we could be adversely affected by our failure to comply with the laws applicable to our foreign activities, including the U.S. Foreign Corrupt Practices Act and other similar worldwide anti-bribery laws.**

Approximately 30.5% of our revenue was derived from international markets during fiscal 2013. Our international operations are presently conducted in China and Australia. Economic conditions, including those resulting from wars, civil unrest, acts of terrorism and other conflicts or volatility in the global markets, may adversely affect our customers, their demand for our services and their ability to pay for our services. In addition, there are numerous risks inherent in conducting our business internationally, including, but not limited to, potential instability in international markets, changes in regulatory requirements applicable to international operations, foreign currency fluctuations, exchange controls and other limits on our ability to repatriate earnings, political, economic and social conditions in foreign countries and complex U.S. and foreign laws and treaties, including tax laws and the U.S. Foreign Corrupt Practices Act (the “FCPA”). These risks could restrict our ability to provide services to international customers or to operate our international business profitably, and our overall business and results of operations could be negatively affected by our foreign activities.

The FCPA and similar anti-bribery laws in other jurisdictions prohibit U.S.-based companies and their intermediaries from making improper payments for the purpose of obtaining or retaining business. We pursue opportunities in certain parts of the world that experience government corruption to some degree, and, in certain circumstances, compliance with anti-bribery laws may conflict with local customs and practices. Our policies mandate compliance with these anti-bribery laws. Further, we require our subcontractors, agents and others who work for us or on our behalf to comply with the FCPA and other anti-bribery laws. Although we have policies and procedures designed to ensure that we, our employees and our agents comply with the FCPA and other anti-bribery laws, there is no assurance that such policies or procedures will protect us against liability under the FCPA or other laws for actions taken by our agents, employees and intermediaries. If we are found to be liable for FCPA violations (either due to our own acts or our inadvertence, or due to the acts or inadvertence of others), we could suffer from severe criminal or civil penalties or other sanctions, which could have a material adverse effect on our reputation, business, results of operations or cash flows. In addition, detecting, investigating, and resolving actual or alleged FCPA violations is expensive and can consume significant time and attention of our senior management.

### Our international operations expose us to foreign currency risk.

A majority of our transactions are in U.S. dollars; however, a few foreign subsidiaries conduct businesses in various foreign currencies. Therefore, we are subject to currency exposures and volatility because of currency fluctuations, inflation changes and economic conditions in these countries. We currently have no foreign currency hedges. We attempt to minimize our exposure to foreign currency fluctuations by matching our revenues and expenses in the same currency for our contracts.

**We are subject to the risks associated with doing business in the People’s Republic of China (PRC).**

We conduct certain business in China through our China Operations, which is organized under the laws of the PRC. Our China operations are directly related to and dependent on the social, economic and political conditions in this country, all of which we have no control over, and are influenced by many factors, including:

- changes in the region’s economic, social and political conditions or government policies;
- changes in trade laws, tariffs and other trade restrictions or licenses;
- changes in foreign exchange regulation in China may limit our ability to freely convert currency to make dividends or other payments in U.S. dollars;
- fluctuations in the value of the RMB (Chinese Yuan) could adversely affect the value of our investment in China;
- adverse changes in tax laws and regulations;
- difficulties in managing or overseeing our China operations, including the need to implement appropriate systems, policies, benefits and compliance programs; and
- different liability standards and less developed legal systems that may be less predictable than those in the United States.

The occurrence or consequences of any of these conditions may restrict our ability to operate and/or decrease the profitability our operations in China.

## Properties

As filed, 1,247 characters.

Our principal executive office is located in Exton, Pennsylvania. We operate our business under office leases in the following locations:

| Location | Operations | Lease Expiration Date | Annual Rent |
| --- | --- | --- | ---: |
| Exton, Pennsylvania | WPCS | January 31, 2014 | $43,632 |
| Redmond, Washington | Seattle | December 31, 2017 | $68,999 |
| Suisun City, California | Suisun City | February 28, 2014 | $63,500 |
| Reno, Nevada | Suisun City | December 31, 2014 | $4,920 |
| Sacramento, California | Suisun City | December 31, 2014 | $35,712 |
| Jamesburg, New Jersey | Trenton | June 30, 2015 | $74,532 |
| Woombye, Queensland, Australia (1) | Australia | December 1, 2013 | $68,132 |
| Nundah, Queensland, Australia | Australia | March 30, 2015 | $31,859 |
| Toowoomba QLD, Australia | Australia | January 31, 2014 | $20,020 |

(1) We lease our Woombye, Queensland, Australia location from Pride Property Trust, of which the former shareholders of Pride are the trustees.

We believe that our existing facilities are suitable and adequate to meet our current business requirements. We intend to renew leases expiring within the next twelve months at their current locations or at similar facilities in the same geographic locations.

## Management's discussion and analysis

As filed, 82,860 characters.

*This Management's Discussion and Analysis of Financial Condition and Results of Operations includes a number of forward-looking statements that reflect Management's current views with respect to future events and financial performance. You can identify these statements by forward-looking words such as “may” “will,” “expect,” “anticipate,” “believe,” “estimate” and “continue,” or similar words. Those statements include statements regarding the intent, belief or current expectations of us and members of its management team as well as the assumptions on which such statements are based. Prospective investors are cautioned that any such forward-looking statements are not guarantees of future performance and involve risk and uncertainties, and that actual results may differ materially from those contemplated by such forward-looking statements.*

*Readers are urged to carefully review and consider the various disclosures made by us in this report and in our other reports filed with the Securities and Exchange Commission. Important factors currently known to Management could cause actual results to differ materially from those in forward-looking statements. We undertake no obligation to update or revise forward-looking statements to reflect changed assumptions, the occurrence of unanticipated events or changes in the future operating results over time. We believe that its assumptions are based upon reasonable data derived from and known about our business and operations and the business and operations of the Company. No assurances are made that actual results of operations or the results of our future activities will not differ materially from its assumptions. Factors that could cause differences include, but are not limited to, expected market demand for the Company’s services, fluctuations in pricing for materials, and competition.*

### Overview

We are a global provider of design-build engineering services for communications infrastructure, with approximately 250 employees in five operations centers on three continents. We provide our engineering capabilities including wireless communication, specialty construction and electrical power to a diversified customer base in the public services, healthcare, energy and corporate enterprise markets worldwide.

The global economy depends on efficient voice, data and video communication. Old communication infrastructure needs to be replaced and new technology needs to be implemented. We believe we have the design-build capabilities to address the demand. For communication infrastructure projects that are significant in scope, we have the ability to offer wireless communication, specialty construction and electrical power. Because we are technology independent, we can integrate multiple products and services across a variety of communication requirements. This gives our customers the flexibility to obtain the most appropriate solution for their communication needs on a cost effective basis. In wireless communication, we can design and deploy all types of wireless systems in a variety of applications. In specialty construction, we have provided services for basic energy. On the electrical power side, we are capable of all types of commercial and industrial electrical work including the integration of advanced building communications technology for voice and data, life safety, security and HVAC.

For the fiscal year ended April 30, 2013, we generated revenues from continuing operations of approximately $42.3 million, compared to $65.5 million for the fiscal year ended April 30, 2012. Our backlog at April 30, 2013 and 2012 was approximately $26.4 million and $23.6 million, respectively.

### Recent Developments

### Executive Management Changes

#### Andrew Hidalgo (Hidalgo) Separation

On July 24, 2013, we entered into the Separation Agreement with Hidalgo, our President, Chief Executive Officer and a member of the board of directors. Pursuant to the Separation Agreement, Hidalgo will resign effective with the Termination Date on July 30, 2013, as the President, Chief Executive Officer and a member of the board of directors of the Company and from all officer and director positions with all of our subsidiaries.

Pursuant to the Separation Agreement, Hidalgo intends to submit an offer to us to acquire the Proposed Acquisitions of the Trenton and Australia Operations. During the Severance Period, we shall continue to pay Hidalgo his current base salary of $325,000 per year through our normal payroll process. At the end of the Severance Period, Hidalgo shall be entitled to receive a Severance Payment equal to Hidalgo’s salary from the Termination Date through the end of the term of his employment agreement (January 31, 2018) minus any payments made to Hidalgo during the Severance Period.

Hidalgo shall be entitled to apply the Severance Payment towards the purchase price of the Proposed Acquisitions, if successful. In the event that the Proposed Acquisitions are not completed by October 1, 2013, the Company and Hidalgo shall negotiate the payment terms of the Severance Payment.

#### Sebastian Giordano (Giordano) Appointment

Effective August 1, 2013, Giordano, a member of our board of directors, will be appointed our Interim Chief Executive Officer.

Effective August 1, 2013, the Company will enter into the Giordano Agreement with Giordano to serve as Interim Chief Executive Officer on a part-time basis until a permanent chief executive officer is appointed. The Giordano Agreement can be terminated by either party upon 30 days prior notice. Pursuant to the Giordano Agreement, Giordano shall receive a monthly consulting fee of $10,833. In addition, upon our approving a new stock incentive plan, Giordano shall receive a grant of 30,000 shares of our common stock and Giordano shall be entitled to receive a discretionary bonus upon successful achievement of a merger or acquisition of the Company by another entity. We will also reimburse Giordano for all reasonable expenses in connection with his services to us.

### Reverse Stock Split

Effective May 28, 2013, we amended our Certificate of Incorporation, as amended, pursuant to which we affected a Reverse Stock Split and reduced the number of authorized shares of common stock by the same ratio, from 100 million to 14,285,715. The total issued and outstanding common stock was decreased from 6,954,766 shares to 993,538 shares. All share-related and per share information in this annual report have been adjusted to give effect to the Reverse Stock Split.

The purpose of the Reverse Stock Split was to raise the per share trading price of WPCS common stock to regain compliance with the $1.00 per share minimum bid price requirement for a continued listing on The NASDAQ Capital Market. In order to maintain the WPCS listing on the NASDAQ Capital Market, on or before June 24, 2013, our common stock was required to have a minimum closing bid price of $1.00 per share for a minimum of ten prior consecutive trading days, which compliance was achieved effective June 12, 2013.

### Secured Note and Warrant Financing

On December 4, 2012, we entered into the Purchase Agreement with the Buyers pursuant to which, we sold an aggregate of (i) $4,000,000 principal amount of Notes and (ii) Warrants to purchase 2,274,796 shares of our Common Stock to the Buyers for aggregate gross Financing proceeds of $4,000,000.

Pursuant to the terms of the Notes, we deposited the initial funds received from the Financing, minus the Initial Lending Amount of $2,178,516 into the Lockbox Account controlled by the Collateral Agent, as collateral agent on behalf of the Buyers. In addition, all payments of our accounts receivable (and our domestic subsidiaries) shall be deposited into the Lockbox Account. We are permitted to receive from the Lockbox Account, on a daily basis, such amount of cash equal to: (A) (i) cash balance in the Lockbox Account plus (ii) 95% of available qualified accounts receivable minus (iii) $250,000 minus (B) amount of principal, accrued interest, fees, costs and expenses owed pursuant to the Notes. The Notes contain certain customary representations and warranties, affirmative and negative covenants and events of default. The principal covenant is that we shall maintain a current ratio of not less than 0.6 to 1.0 as of the last calendar day of each month. As of April 30, 2013, we are in compliance with these covenants.

We used the Initial Lending Amount to repay the existing loan of $2,000,000, plus $78,516 of interest accrued and fees and expenses to Sovereign, which Credit Agreement was terminated in connection with the Financing, and $100,000 for Buyer legal fees in connection with the Notes.

Pursuant to the Purchase Agreement, we agreed to use our reasonable best efforts to obtain our Stockholders’ Approval at the next annual stockholder meeting for the issuance of all of the securities issuable pursuant to the Purchase Agreement. Prior to Stockholder Approval, the Buyers were prohibited from converting the Notes and/or exercising the Warrants and receiving shares of our Common Stock, in the aggregate, such that the number of shares of Common Stock issued upon such conversions and/or exercises exceeds 19.9% of the issued and outstanding shares of our Common Stock as of the Closing Date.

We obtained Stockholder Approval on February 28, 2013. In addition, we obtained stockholders’ approval to increase our authorized shares of common stock from 3,571,429 to 14,285,715 and recorded an amendment to our articles of incorporation on March 4, 2013. As a result of the amendment, we expect to have sufficient common stock to fulfill our conversion obligations under the Purchase Agreement, and the Buyers are permitted to convert the Notes and/or exercise the Warrants in excess of 19.9% of the issued and outstanding shares of our Common Stock at a price that is less than the greater of book or market value.

The Notes were initially convertible into shares of Common Stock at the Conversion Price of $2.6376 per share. The Conversion Price will be adjusted to 85% of the average of the closing bid prices for the five consecutive trading dates immediately prior to the following adjustment dates: (1) the earlier of the effective date of a registration statement or six months after closing (the First Adjustment); (2) the later of the date that is three months after the First Adjustment or one year after closing; and (3) on the Stockholder Approval Date.

On the Stockholder Approval Date, the Conversion Price was adjusted to $2.1539 per share. There was no adjustment to the Conversion Price on the First Adjustment date. The Warrants are exercisable for a period of five years from the Closing Date at an initial exercise price of $3.2970 per share (the Exercise Price). The Exercise Price is subject to the same adjustments as provided in the Notes as described above, and as a result, the Exercise Price was adjusted to $2.1539 per share on the Stockholder Approval Date. As of the date of this annual report, none of the Notes or Warrants have been converted or exercised, accordingly.

### Zurich Forbearance Agreement

On July 12, 2012, we executed the Financing Agreement with Zurich, to assist in the completion of the project contract with the Owner or Cooper Project. Under the terms of the Financing Agreement, Zurich advanced us $793,927 to assist in the completion of the Cooper Project, a $16.2 million project completed by our Trenton Operations. We were to repay Zurich the financial advances by September 2012, however we were in default under the terms of the Financing Agreement as we did not repay Zurich the $793,927, and Zurich paid certain of the our vendors pursuant to Zurich’s obligations under its payment bond on the Cooper Project. In addition, we are contingently liable to Zurich and its affiliate F&D under the Indemnity Agreement. Zurich and F&D, as surety, have issued certain performance and payment bonds on behalf of owners or customers regarding the Company’s work on various projects under the Indemnity Agreement. We also agree to indemnify the surety for any payments made by Zurich on contracts of suretyship, guaranty or indemnity.

On April 17, 2013, we executed the Forbearance Agreement with Zurich, which supersedes the Financing Agreement. As of April 16, 2013, the total Loss Amount due Zurich under the Forbearance Agreement less payments received by Zurich was $2,836,668. Under the Forbearance Agreement, among other things, the parties have agreed to the following payments which will be credited against the Loss Amount owed to Zurich by us: (1) the Interim Liability Payments; (2) the Customer Payments; and (3) the Claim, up to the Loss Amount as it exists at the time. As of April 30, 2013, the net Loss Amount owed Zurich under the Forbearance Agreement was $1,743,986, and is classified as Other Payable on our consolidated balance sheets. As of the date of this annual report, the Loss Amount owed to Zurich is approximately $1,634,000 following Interim Liability and Customer Payments made subsequent to April 30, 2013.

Each or any of the following shall constitute an event of default under the Forbearance Agreement: (a) failure by us to make any of the Interim Liability Payments; (b) failure by us to remit any Customer Payments received; (c) the failure by us or the Owner to remit the proceeds of the Claim to Zurich; and (d) any Loss Amount that still exists as of December 31, 2013. We are currently in compliance with the terms of the Forbearance Agreement.

We have submitted a revised Claim and request for equitable adjustment to the Owner in the amount of $2,421,425 for significant delays, disruptions and construction changes that were beyond our control and required us to perform additional work. We are currently in negotiations with the Owner to settle the Claim. The next step in the resolution process as set forth in the contract with the Owner is mandatory non-binding mediation through the AAA. On April 15, 2013, we filed the Mediation request with the AAA with regard to the Claim. We are awaiting a response from the Owner, and as such no date has been established for the Mediation. If we are successful in the settlement of this Claim we expect to use the proceeds from the Claim to repay Zurich the Loss Amount as it exists at the time. There can be no assurance that we will be successful in settling with the Owner for all or a portion of the submitted claim.

### Sale of Hartford and Lakewood Operations

On July 25, 2012, we and the Hartford and Lakewood Operations entered into the Asset Purchase Agreement, pursuant to which the Hartford and Lakewood Operations sold substantially all of their assets and liabilities to two newly-created subsidiaries of Kavveri for a purchase price of $5.5 million in cash, subject to adjustment and assumption of their various liabilities. At closing, we received $4.9 million in cash, and the remaining $600,000 of the purchase price was to be placed into escrow pursuant to the Asset Purchase Agreement. We used the proceeds from this sale to repay the full amount outstanding under a credit agreement of $4,022,320 as of July 25, 2012. The difference of $877,680 was deposited in our operating cash account.

The parties agreed to place $350,000 of the purchase price into escrow pending assignment of certain contracts post-closing, with us receiving those funds upon successful assignment of the contracts. The remaining $250,000 was to be escrowed for purposes of satisfying certain adjustments to the purchase price based on a final net asset valuation to be completed after closing as well as repurchase obligations of certain delinquent accounts receivable. No later than three days after the final determination of the net asset valuation, the purchasers are required to deposit the $600,000 into escrow. To date, we have not reached agreement with Kavveri with regard to resolving the net asset valuation. On January 28, 2013, Kavveri submitted a revised aggregate claim for indemnification by us of approximately $1,511,000 with regard to (1) net asset valuation claim owed of approximately $698,000, which includes accounts receivable deemed uncollectible of $519,000 related to a project that was completed by our former Hartford Operations and accepted by the customer on or prior to the Closing Date; and (2) delinquent account receivables to be repurchased of approximately $813,000.

On February 27, 2013, we notified Kavveri that we disputed these claims. Among other things, we dispute the amount of the delinquent receivables, and believe that after consideration of reserves for uncollectible accounts and other offsets previously considered in its calculation of the net asset valuation, the total amount of accounts receivable deemed uncollectible for repurchase to be approximately $36,000. However, we contend that Kavveri missed the deadline to notify us regarding the repurchase of delinquent receivables pursuant to the terms of the Asset Purchase Agreement regarding timing for notification to us, which would eliminate any repurchase payment owed by us to Kavveri. We also believe that the $519,000 of accounts receivable claimed for indemnification by Kavveri is without merit. Finally, we also dispute the net asset valuation claim, and believe Kavveri owes us approximately $58,000, following our evaluation of the uncollectible accounts receivable. With regard to the net asset valuation claim, if the parties disagree, and if they are unable to come to an agreement, the matter will be submitted to one or more independent, nationally-recognized accounting firms for final determination. As of the date of this annual report, no matters have been submitted to the independent accounting firm.

All operating results disclosed in this quarterly report only include the results from continuing operations, and exclude the results for the St. Louis and Sarasota Operations divested in September 2011, and the Hartford and Lakewood Operations asset sales, each of which are presented as discontinued operations. The Sarasota, Lakewood and Hartford Operations were previously reported in the wireless communications segment and the St. Louis Operation was reported in the specialty construction segment. We have also combined the management and operations of the Seattle and Portland Operations for efficiency.

### Industry Trends

We focus on markets such as public services, healthcare, energy and international which continue to show growth potential.

- *Public services.* We provide communications infrastructure for public services which include utilities, education, military and transportation infrastructure. We believe there is an active market for communications infrastructure in the public service sector due to the need to create cost efficiencies through the implementation of new communications technology.
- *Healthcare. W*e provide communications infrastructure for hospitals and medical centers. In the healthcare market, the aging population is resulting in demands for upgraded and additional hospital infrastructure. New construction and renovations are occurring for hospitals domestically and internationally. In addition, there is a need to reduce the cost of delivering healthcare by implementing new communications technology. Our services include electrical power, structured cabling, security systems, life safety systems, environmental controls and communication systems.
- *Energy*. We provide communications infrastructure for petrochemical, natural gas and electric utility companies as well as renewable energy systems for various entities. The need to deliver basic energy more efficiently and to create new energy sources is driving the growth in energy construction. This creates opportunities to upgrade and deploy new communications technology and design and build renewable energy solutions.
- *International*. We provide communications infrastructure internationally for a variety of companies and government entities. China is spending on building its internal infrastructure and Australia is upgrading their infrastructure. Both China and Australia have experienced positive GDP growth rates. The total international revenue was approximately 30.5% and 28.1 % for the years ended April 30, 2013 and 2012, respectively.

### Current Operating Trends and Financial Highlights

Management currently considers the following events, trends and uncertainties to be important in understanding our results of operations and financial condition during the current fiscal year.

In regards to our financial results for the year ended April 30, 2013, we continue to make progress in turning around our financial performance, as compared to the year ended April 30, 2012. We have employed cost reduction strategies, and made management changes by hiring experienced leadership in Suisun City, especially in the project management and estimating roles, which we believe has significantly helped this operation return to EBITDA profitability. In our Trenton Operations, we completed the Cooper Project, which was a project we incurred a loss of approximately $6 million in fiscal 2012. During fiscal 2013, we have received approximately $1.6 million of change orders, in order to recoup some of the loss that we incurred in the prior year. At the same time, we concentrated the Trenton Operation on pursuing smaller revenue projects that can be performed profitably and implemented cost reduction strategies, resulting in this operation generating EBITDA profitability in fiscal 2013. Furthermore, we have also submitted a revised claim for approximately $2.4 million to the Owner for significant cost overruns as a result of significant delays, disruptions and construction changes which were beyond our control and required us to perform additional work.

For the year ended April 30, 2013, we generated consolidated EBITDA as adjusted of approximately $818,000, as compared to an EBITDA loss as adjusted of $12.2 million for the year ended April 30, 2012. Except for the results of our Australia Operations, the remaining four operation centers performed profitably in fiscal 2013 from an EBITDA as adjusted perspective. The results for the year ended April 30, 2013 include $1,640,644 of change orders received by the Trenton Operations related to the Cooper Project. As mentioned above, the financial results for the year ended April 30, 2012 were adversely impacted by the significant increases in cost estimates and costs incurred on four projects in the Trenton Operations, the most significant of these being the Cooper Project.

EBITDA as adjusted is defined as earnings before interest, noncontrolling interest, income taxes including noncash charges for deferred tax asset valuation allowances, gain or loss from discontinued operations, change in fair value of derivative liabilities, acquisition-related contingent earn-out costs, goodwill impairment, one-time charges related to strategic alternatives and depreciation and amortization. Management uses EBITDA to assess the ongoing operating and financial performance of our Company. This financial measure is not in accordance with GAAP and may differ from non-GAAP measures used by other companies. A reconciliation of EBITDA as adjusted is as follows:

|  | Years Ended April 30, 2013 | 2012 |
| --- | ---: | ---: |
| NET LOSS ATTRIBUTABLE TO WPCS, GAAP | $(6,910,727) | $(20,547,831) |
| Plus: |  |  |
| Net income (loss) attributable to noncontrolling interest | 95,406 | (21,840) |
| Loss from discontinued operations, net of tax | 589,619 | 2,845,677 |
| Loss (gain) from disposal of discontinued operations | (1,756,586) | 1,032,737 |
| Income tax provision | 758,144 | 1,876,476 |
| Interest expense | 2,124,833 | 845,502 |
| Change in fair value of derivative liabilities | 2,703,248 | - |
| Interest income | (54,620) | (54,245) |
| Change in fair value of acquisition-related contingent consideration | - | 83,628 |
| One time strategic costs | - | (45,346) |
| Goodwill and intangible assets impairment | 1,936,059 | 20,167 |
| Depreciation and amortization | 1,332,169 | 1,775,672 |
| Consolidated EBITDA as adjusted, Non-GAAP | $817,545 | $(12,189,403) |

In regards to our financial results for the year ended April 30, 2013, we generated a net loss of approximately $6,911,000, or $6.95 per diluted common share, which includes noncash charges of approximately $1,936,000 for the impairment of goodwill related to Pride, noncash charges of approximately $4.1 million related to the amortization of Note discount and change in fair value of the derivative liabilities associated with the Notes and Warrants, and a $2.3 million noncash valuation allowance on our foreign deferred tax assets. These noncash charges have no impact on our operations or cash flows. The net loss also includes income from discontinued operations for the Hartford and Lakewood Operations of approximately $1.2 million, or $1.17 per diluted common share.

The net loss in fiscal 2013 compares to a net loss of approximately $20,548,000, or $20.68 per diluted common share, for the year ended April 30, 2012, as a result of the adverse financial performance of the Trenton Operations in fiscal 2012. The net loss in 2012 includes a $6.6 million noncash valuation allowance on our U.S. Federal and state deferred tax assets. The net loss also includes a loss from discontinued operations for the Hartford, Lakewood, Sarasota and St. Louis Operations of approximately $3.9 million, or $3.90 per diluted common share for the year ended April 30, 2012.

The markets we serve in public services, healthcare, and energy continue to afford opportunities to grow our business. Two of our most important economic indicators for measuring our future revenue producing capability and demand for our services continue to be our backlog and bid list. For comparative purposes our backlog and bid list for prior periods only includes our continuing operations. Our backlog of unfilled orders was approximately $26.4 million at April 30, 2013, compared to backlog of $27.6 million at January 31, 2013, and $23.6 million at April 30, 2012.

Our bid list, which represents project bids under proposal for new and existing customers, was approximately $60.7 million at April 30, 2013, compared to approximately $54.4 million at January 31, 2013 and $86.5 million at April 30, 2012. Our goal is to continue converting more of these bids into contract awards and to increase our backlog in the quarters ahead.

We believe our design-build engineering focus for public services, healthcare, energy and corporate enterprise infrastructure will create additional opportunities both domestically and internationally. We believe that the ability to provide comprehensive communications infrastructure services including wireless communication, specialty construction and electrical power gives us a competitive advantage. In regards to strategic development, our focus is on organic growth opportunities and we feel optimistic about the markets we serve as evidenced by our new contract awards and customers continuing to seek bids from us, due to our experience in these markets.

### Results of Operations for the Fiscal Year Ended April 30, 2013 Compared to Fiscal Year Ended April 30, 2012

Consolidated results for the years ended April 30, 2013 and 2012 were as follows.

|  | Years Ended April 30, 2013 |  | 2012 |  |
| --- | ---: | ---: | ---: | ---: |
| REVENUE | $42,328,675 | 100.0% | $65,462,157 | 100.0% |
| COSTS AND EXPENSES: |  |  |  |  |
| Cost of revenue | 29,948,760 | 70.8% | 63,504,085 | 97.0% |
| Selling, general and administrative expenses | 11,562,370 | 27.3% | 14,102,129 | 21.6% |
| Depreciation and amortization | 1,332,169 | 3.1% | 1,775,672 | 2.7% |
| Goodwill and intangible assets impairment | 1,936,059 | 4.5% | 20,167 | - |
| Change in fair value of acquisition-related contingent consideration | - | - | 83,628 | 0.1% |
| Total costs and expenses | 44,779,358 | 105.7% | 79,485,681 | 121.4% |
| OPERATING LOSS | (2,450,683) | (5.7)% | (14,023,524) | (21.4)% |
| OTHER EXPENSE (INCOME): |  |  |  |  |
| Interest expense | 2,124,833 | 5.1% | 845,502 | 1.3% |
| Change in fair value of derivative liabilities | 2,703,248 | 6.4% | - | - |
| Interest income | (54,620) | (0.1)% | (54,245) | (0.1)% |
| Loss from continuing operations before income tax provision | (7,224,144) | (17.1)% | (14,814,781) | (22.6)% |
| Income tax provision | 758,144 | 1.8% | 1,876,476 | 2.9% |
| LOSS FROM CONTINUING OPERATIONS | (7,982,288) | (18.9)% | (16,691,257) | (25.5)% |
| Discontinued operations |  |  |  |  |
| Loss from operations of discontinued operations, net of tax | (589,619) | (1.4)% | (2,845,677) | (4.3)% |
| Gain (loss) from disposal | 1,756,586 | 4.2% | (1,032,737) | (1.6)% |
| Income (loss) from discontinued operations, net of tax | 1,166,967 | 2.8% | (3,878,414) | (5.9)% |
| CONSOLIDATED NET LOSS | (6,815,321) | (16.1)% | (20,569,671) | (31.4)% |
| Net income (loss) attributable to noncontrolling interest | 95,406 | 0.2% | (21,840) | - |
| NET LOSS ATTRIBUTABLE TO WPCS | $(6,910,727) | (16.3)% | $(20,547,831) | (31.4)% |

25

### Revenue

Revenue for the year ended April 30, 2013 was approximately $42,329,000, as compared to approximately $65,462,000 for the year ended April 30, 2012. The decrease in revenue was due to two factors: (1) the planned strategic change to re-focus the Trenton Operation as a smaller revenue producing operation that returns to profitability; and (2) project delays or postponement of new project bid awards at the state and local government level due to political and economic climate, primarily in the Australia Operations. For the year ended April 30, 2013 and 2012, we had one customer, the Cooper Project, which comprised 13.6% and 15.5% of total revenue, respectively.

Wireless communication segment revenue for the years ended April 30, 2013 and 2012 was approximately $17,665,000 or 41.7% and $23,312,000 or 35.6% of total revenue, respectively. The decrease in revenue was due primarily to project delays on existing contracts and delays or postponements of new project bid awards from prior quarters at the state and local government level for public services projects, primarily in the Australia Operations, the revenue of which is expected to be recognized in future periods. The increase as a percentage of total revenue was due to a change in segment revenue mix as a result of the reduction in revenue of the electrical power segment described below.

Specialty construction segment revenue for the years ended April 30, 2013 and 2012 was approximately $5,258,000 or 12.4% and $6,094,000 or 9.3% of total revenue, respectively. The decrease in revenue was attributable to fewer projects completed for year ended April 30, 2013 as compared to the same period in the prior year for the China Operations.

Electrical power segment revenue for the years ended April 30, 2013 and 2012 was approximately $19,406,000 or 45.9% and $36,056,000 or 55.1% of total revenue, respectively. The decrease in revenue and as a percentage of revenue was due primarily to the planned strategic change to re-focus the Trenton Operation as a smaller revenue producing operation that returns to profitability. It is not expected that similar future projects will replace the Cooper Project or other larger projects that were completed in the prior period by the Trenton Operations. Therefore, it is expected that our revenue in the electrical power segment will not substantially increase in the near future, as compared to current period levels.

### Cost of Revenue

Cost of revenue consists of direct costs on contracts, materials, direct labor, third party subcontractor services, union benefits and other overhead costs. Our cost of revenue was approximately $29,949,000 or 70.8% of revenue for the year ended April 30, 2013, compared to $63,504,000 or 97.0% for the same period of the prior year. The dollar decrease in our total cost of revenue is primarily due to primarily due to two factors: (1) during the year ended April 30, 2012, we increased the cost estimates significantly on four large projects and accrued the expected losses on the projects in the Trenton Operations, which resulted in a significant increase in the cost of revenue. As these projects were completed and costs were incurred and estimated losses were recognized in the prior fiscal year, there were no significant costs incurred on these projects for the year ended April 30, 2013; and (2) the corresponding decrease in revenue for the year ended April 30, 2013. The decrease as a percentage of revenue is due to: (1) the revenue blend of project work completed during the period; and (2) the current period contained a smaller percentage of lower margin work performed by the Trenton Operations, including the Cooper Project, as compared to the same period in the prior period. The cost of revenue as a percentage of revenue was abnormally high in the year ended April 30, 2012 due to the increase in cost estimates on the four projects described above; and (3) the current period included approximately $1,641,000 of change order revenue related to the Cooper Project, the costs of which were incurred or accrued in fiscal 2012.

Wireless communication segment cost of revenue and cost of revenue as a percentage of revenue for the years ended April 30, 2013 and 2012 was approximately $12,518,000 and 70.9% and $17,023,000 and 73.0%, respectively. The dollar decrease in our cost of revenue is due primarily to the corresponding decrease in revenue for the year ended April 30, 2013. The decrease as a percentage of revenue is due to the revenue blend of project work performed during the year ended April 30, 2013.

Specialty construction segment cost of revenue and cost of revenue as a percentage of revenue for the years ended April 30, 2013 and 2012 was approximately $3,446,000 and 65.5% and $3,981,000 and 65.3%, respectively. The dollar decrease in our cost of revenue is due to the corresponding decrease in revenue for the year ended April 30, 2013 in our China Operations. The slight increase as a percentage of revenue is due to the revenue blend of project work performed.

Electrical power segment cost of revenue and cost of revenue as a percentage of revenue for the years ended April 30, 2013 and 2012 was approximately $13,984,000 and 72.1% and $42,500,000 and 117.9%, respectively. The dollar decrease in our total cost of revenue is primarily due to two factors: (1) during the year ended April 30, 2012, we increased the cost estimates significantly on four large projects and accrued the expected losses on the projects in the Trenton Operations, which resulted in a significant increase in the cost of revenue. As these projects were completed and costs were incurred and estimated losses were recognized in the prior fiscal year, there were no significant costs incurred on these projects for the year ended April 30, 2013; and (2) the corresponding decrease in revenue for the year ended April 30, 2013. The decrease as a percentage of revenue is due to: (1) during the year ended April 30, 2012, we increased the cost estimates significantly on four large projects and accrued the expected losses on the projects in the Trenton Operations, which resulted in a significant increase in the cost of revenue as a percentage of revenue. As these projects were completed and costs incurred in prior periods, there were no significant costs incurred on these projects for the year ended April 30, 2013; and (2) the current period containing a much smaller percentage of lower margin work performed by the Trenton Operations, including the Cooper Project, as compared to the same period in the prior period. The cost of revenue as a percentage of revenue was abnormally high in the year ended April 30, 2012 due to the increase in cost estimates on the four projects described above; and (3) the current period included approximately $1,641,000 of change order revenue related to the Cooper Project, the costs of which were incurred or accrued in fiscal 2012.

### Selling, General and Administrative Expenses

For the year ended April 30, 2013, total selling, general and administrative expenses were approximately $11,562,000 or 27.3% of total revenue compared to $14,102,000, or 21.5% of revenue for the same period of the prior year. Included in selling, general and administrative expenses for the year ended April 30, 2013 is $6,732,000 for salaries, commissions, payroll taxes and other employee benefits. The decrease of $1,064,000 in salaries and commissions compared to the prior period is due to lower salaries from cost reduction strategies. Professional fees were $1,151,000, which include on-going accounting, legal and investor relation fees. Insurance costs were $942,000 and rent for office facilities was $491,000. Automobile and other travel expenses were $1,278,000 and telecommunication expenses were $186,000. Other selling, general and administrative expenses totaled $782,000. The decrease in other selling, general and administrative expenses compared to the prior year is due to primarily to lower costs incurred related to bad debt expense, sales of fixed assets, recruiting and subscription expenses. For the year ended April 30, 2013, total selling, general and administrative expenses for the wireless communication, specialty construction and electrical power segments were approximately $4,979,000, $503,000 and $3,142,000, respectively, with the balance of approximately $2,938,000 pertaining to corporate expenses.

For the year ended April 30, 2012, total selling, general and administrative expenses were approximately $14,102,000, or 21.5% of total revenue. Included in selling, general and administrative expenses for the year ended April 30, 2012 is $7,796,000 for salaries, commissions, payroll taxes and other employee benefits. Net professional fees were $1,088,000 which include on-going accounting, legal and investor relation fees of $929,000, $297,000 of incremental third party investment banking and legal expenses related to the terminated strategic alternatives effort, offset by a $250,000 break-up fee paid by Multiband, Inc. (Multiband) regarding the termination of the acquisition of our company. Insurance costs were $945,000 and rent for office facilities was $570,000. Automobile and other travel expenses were $1,376,000 and telecommunication expenses were $249,000. Other selling, general and administrative expenses totaled $2,078,000, which included a $739,000 provision for bad debt expense, primarily related to our China and Australia Operations. For the year ended April 30, 2012, total selling, general and administrative expenses for the wireless communication, specialty construction and electrical power segments were approximately $5,857,000, $876,000 and $4,403,000, respectively, with the balance of approximately $2,966,000 pertaining to corporate expenses.

### Depreciation and Amortization

For the years ended April 30, 2013 and 2012, depreciation was approximately $1,200,000 and $1,617,000, respectively. The net decrease in depreciation expense is due to the retirement of certain assets offset by fixed asset additions. The amortization of customer lists and backlog for the years ended April 30, 2013 and 2012 was $133,000 and $159,000, respectively. The decrease in amortization expense compared to the same period in the prior year was due primarily to certain customer lists and backlog being fully amortized in the prior year compared to the current year. All customer lists are amortized over a period of three to nine years from the date of their acquisitions. Backlog is amortized over a period of one to three years from the date of acquisition based on the expected completion period of the related contracts.

### Goodwill and Intangible Assets Impairment

As a result of performing our annual step one testing for goodwill impairment, we determined that the carrying value of Pride, included in our Australia Operations, exceeded its fair value, thus failing the first step of the goodwill impairment test, primarily driven by current operating results and economic climate in Pride’s operations. Based on the results of the step one testing, we completed the second step of the goodwill impairment test, which included calculating an implied fair value of the goodwill of Pride, by allocating the fair values of substantially all of its individual assets, liabilities and identified intangible assets, as if this reporting unit had been acquired in a business combination, which resulted in no allocation of fair value to goodwill. As a result, we recorded a goodwill impairment charge of $1,936,000 in the fourth quarter of fiscal 2013 ended April 30, 2013. This impairment charge is a noncash charge that does not impact our consolidated cash flows or adjusted EBITDA.

At April 30, 2012, we determined that the customer lists for the Trenton reporting unit was impaired due to projected future operating performance. As a result, we recorded an impairment charge related to these customer lists of $20,167.

### Change in Fair Value of Acquisition-Related Contingent Consideration

For the years ended April 30, 2013 and 2012, the change in fair value of acquisition-related contingent consideration was approximately $0 and $84,000, respectively. The change in fair value of acquisition-related contingent consideration is due to the non-cash expense recorded in the fiscal 2012 statement of operations for the change in present value of future payments of acquisition-related contingent consideration related to the Pride acquisition. In connection with the acquisition of Pride on November 1, 2009, during fiscal 2012, we paid additional purchase price of $1,047,732 to the former Pride shareholders upon the achievement of specified earnings before interest and taxes. As a result, the settlement acquisition-related contingent consideration was completed, and no further expense was recorded.

### Interest Expense and Interest Income

For the years ended April 30, 2013 and 2012, interest expense was approximately $2,125,000 and $846,000, respectively. The increase in interest expense is due primarily to the following: (1) the recognition of the initial noncash interest expense of approximately $244,000 for the excess in the fair value of the derivatives related to the embedded conversion features of the Notes and Warrants over the debt amount as of the Closing Date; (2) noncash interest expense for the amortization of the debt discount for the Notes of $1,111,000 for the year ended April 30, 2013; (3) the amortization of the remaining Sovereign debt issuance costs of $372,000 as a result of the termination of the Credit Agreement on December 5, 2012; and (4) the amortization of debt issuance costs related to the Notes of approximately $68,000.

For the years ended April 30, 2013 and 2012, interest income was approximately $55,000 and $54,000, respectively, primarily from our Australia Operations.

### Change in Fair Value of Derivative Liabilities

We determine the fair value of the embedded conversion features of the Notes and the Warrants and record each of them as a discount to the Notes and each as a derivative liability. Accordingly, changes in the fair value of the derivatives are recognized and classified as an unrealized noncash gain or loss on the derivative financial instruments. For the year ended April 30, 2013, the loss on the fair value of the embedded conversion features of the Notes and Warrants was approximately $473,000 and $2,230,000, respectively, due primarily to the increase in the market price of our common stock from the Closing Date to April 30, 2013.

### Income Taxes

The actual income tax rate from continuing operations for the year ended April 30, 2013 was -10.5% compared to -12.7% for same period in the prior year. The difference was primarily due to no tax benefit being claimed for Federal and state losses during the year ended April 30, 2013 as well as the establishment of a tax valuation allowance against our deferred tax asset as of April 30, 2013 and 2012.

As of April 30, 2013, we had federal net operating losses of approximately $24 million.

### Income (Loss) From Discontinued Operations

As a result of the sale of the assets of the Hartford and Lakewood Operations on July 25, 2012, we recorded the financial results of these operations as discontinued operations. For the year ended April 30, 2013, we recorded income from discontinued operations of approximately $1,167,000, net of tax. Included in the income from discontinued operations is a gain from disposal of approximately $1,757,000 net of $56,000 of expenses directly related with the sale of the assets of these operations.

As a result of the sale of the assets of the Hartford and Lakewood Operations as described above, and the common stock of the St. Louis and Sarasota Operations to Multiband on September 1, 2011, we recorded the financial results of these operations as discontinued operations. For the year ended April 30, 2012, we recorded a loss from discontinued operations of approximately $3,878,000, net of tax, including the allocation of valuation allowances on deferred tax assets. Included in the loss from discontinued operations was an approximate $1,033,000 loss on disposal of the St. Louis and Sarasota Operations.

### Net Loss Attributable to WPCS

The net loss attributable to WPCS was approximately $6,911,000 for the year ended April 30, 2013. Net loss was net of Federal and state income tax provision of approximately $758,000. The net loss attributable to WPCS was approximately $20,548,000 for the year ended April 30, 2012. Net loss was net of Federal and state income tax provisions of approximately $1,876,000.

### Liquidity and Capital Resources

At April 30, 2013, we had a working capital deficiency of approximately $484,000, which consisted of current assets of approximately $14,596,000 and current liabilities of $15,080,000. This compares to a working capital deficiency of approximately $1,130,000 at April 30, 2012. The decrease in a working capital deficiency since the fiscal year ended April 30, 2012 is due primarily to EBITDA as adjusted generated in fiscal 2013, proceeds from the Notes and the sale of the assets of the Hartford and Lakewood Operations on July 25, 2012. We used the proceeds from these latter two transactions to repay the amounts then outstanding under the Credit Agreement.

Our cash and cash equivalents balance at April 30, 2013 of $1,410,000 included $495,000 of cash in our Australia Operations associated with our permanent reinvestment strategy. Subject to the working capital needs of Australia, there is approximately $997,000 of loans due from Australia that could be repaid to us in the future to help with working capital obligations.

Our working capital needs are influenced by our level of operations, and generally increase with higher levels of revenue. Our sources of cash in the last several years have come from operating activities, credit facility borrowings and sale of convertible securities. Our future operating results may be affected by a number of factors, including our success in bidding on future contracts and our continued ability to manage our controllable operating costs effectively. If we were to make acquisitions in the future that involve consideration other than stock, our cash requirements may increase. Our capital requirements depend on numerous factors, including the market for our services, the resources we devote to developing, marketing, selling and supporting our business, and the timing and extent of establishing additional markets and other factors.

Operating activities used approximately $3,182,000 of cash for the year ended April 30, 2013. The sources of cash from operating activities total approximately $9,527,000, comprised of an approximately $6,664,000 in net noncash charges, a $2,528,000 decrease in accounts receivable, a $12,000 decrease in costs and estimated earnings in excess of billings on uncompleted contracts, a $218,000 decrease in deferred contract costs, an $86,000 decrease in prepaid taxes, and a $19,000 increase in deferred revenue. The uses of cash from operating activities total approximately $12,709,000, comprised of a consolidated net loss of approximately $6,815,000 , a $1,869,000 increase in restricted cash, a $15,000 increase in inventory, a $45,000 increase in prepaid expenses and other current assets, a $55,000 increase in income taxes receivable, a $127,000 increase in other assets, a $1,870,000 decrease in accounts payable and accrued expenses, and a $1,913,000 decrease in billings in excess of costs and estimated earnings on uncompleted contracts.

Our investing activities provided cash of approximately $4,223,000 for the year ended April 30, 2013. Investing activities include proceeds of $4,547,000 from the asset sales of the Hartford and Lakewood Operations, net of approximately $56,000 of direct transaction costs, and $290,000 of liabilities paid that were not assumed by Kavveri. The net proceeds of the asset sales were used to fully repay amounts outstanding under our Credit Agreement. These proceeds were offset by the net payment of approximately $324,000 used for acquiring property and equipment during the year ended April 30, 2013.

Our financing activities used cash of approximately $439,000 for the year ended April 30, 2013. Financing activities which used cash include repayments under the Credit Agreement of approximately $4,964,000, debt issuance costs paid of $231,000, repayments to joint venture partner of approximately $2,539,000, repayments to Zurich of $25,000, and total repayments under loans payable and capital lease obligations of approximately $86,000. These financing uses of cash are offset by additional financing sources including a settlement of $222,000 relating to a Section 16(b) shareholder derivative lawsuit, gross proceeds from the Notes of $4,000,000, borrowings of short-term bank loan for the joint venture of $2,389,000 and other payable due from Zurich of $794,000.

#### Convertible Debenture Offering

On December 4, 2012, we entered into the Purchase Agreement with the Buyers pursuant to which, we sold an aggregate of (i) $4,000,000 principal amount of Notes and (ii) the Warrants to purchase 2,274,796 shares of our Common Stock, to the Buyers for aggregate Financing gross proceeds of $4,000,000. In connection with the Financing, (i) we entered into a the Registration Rights Agreement, (ii) we and our subsidiaries entered into the Security Agreement, and (iii) our subsidiaries entered into the Guaranty in favor of the collateral agent for the Buyers. The Closing Date of the Financing was December 5, 2012.

Pursuant to the terms of the Notes, we deposited the initial funds received from the Financing, minus the Initial Lending Amount of $2,178,516 into the Lockbox Account controlled by the Collateral Agent, as collateral agent on behalf of the Buyers. In addition, all our accounts receivable (and of our domestic subsidiaries) shall be deposited into the Lockbox Account. We are permitted to receive from the Lockbox Account, on a daily basis, such amount of cash equal to: (A) (i) cash balance in the Lockbox Account plus (ii) 95% of available qualified accounts receivable minus (iii) $250,000 minus (B) amount of principal, accrued interest, fees, costs and expenses owed pursuant to the Notes. The Notes contain certain customary representations and warranties, affirmative and negative covenants, and events of default. The principal covenant is that we shall maintain a current ratio of not less than 0.6 to 1.0 as of the last calendar day of each month. As of April 30, 2013, we are in compliance with these covenants.

We used the Initial Lending Amount to repay the existing loan described above of $2,000,000, plus $78,516 of interest accrued and fees and expenses to Sovereign, which Credit Agreement was terminated in connection with the Notes, and $100,000 for Buyer legal expenses in connection with the Notes. In addition, we agreed to pay a consulting fee to a consultant acceptable to the Buyers of not more than $5,000 per month during the term of the Notes.

The Notes will mature June 5, 2014 and bear interest at 4% per annum, which will be payable quarterly in arrears and may be paid, in certain conditions, through the issuance of shares, at the discretion of the Buyers.

Pursuant to the Purchase Agreement, we agreed to use our reasonable best efforts to obtain Stockholders’ Approval at the next annual stockholder meeting for the issuance of all of the securities issuable pursuant to the Purchase Agreement. Prior to Stockholder Approval, the Buyers were prohibited from converting the Notes and/or exercising the Warrants and receiving shares of our Common Stock, in the aggregate, such that the number of shares of Common Stock issued upon such conversions and/or exercises exceeds 19.9% of the issued and outstanding shares of our Common Stock as of the Closing Date.

We obtained Stockholder Approval on February 28, 2013. In addition, we obtained stockholders’ approval to increase our authorized shares of common stock from 3,571,429 to 14,285,715. As a result of the Stockholder Approval, we expect to have sufficient common stock to fulfill our conversion obligations under the Purchase Agreement, and the Buyers are permitted to convert the Notes and/or exercise the Warrants in excess of 19.9% of the issued and outstanding shares of our Common Stock at a price that is less than the greater of book or market value.

The Notes were initially convertible into shares of Common Stock at a Conversion Price of $2.6376 per share. As of April 30, 2013, there was no conversion of the Notes into shares of Common Stock. The Conversion Price will be adjusted to 85% of the average of the closing bid prices for the five consecutive trading dates immediately prior to the following adjustment dates: (1) the earlier of the effective date of a registration statement or six months after closing, (the First Adjustment); (2) the later of the date that is three months after the First Adjustment or one year after closing (the Second Adjustment); and (3) on the Stockholder Approval Date.

On the Stockholder Approval Date, the Conversion Price was adjusted to $2.1539 per share. There was no adjustment to the Conversion Price on the First Adjustment date. The Warrants are exercisable for a period of five years from the Closing Date at an initial exercise price of $3.2970 per share (the Exercise Price). The Exercise Price is subject to the same adjustments as provided in the Notes as described above and, as a result, the Exercise Price was adjusted to $2.1539 per share on the Stockholder Approval Date. As of the date of this annual report, none of the Notes or Warrants have been converted or exercised, accordingly.

If an event of default under the Notes occurs, upon the request of the holder of the Note, we will be required to redeem all or any portion of the Note (including all accrued and unpaid interest), in cash, at a price equal to the greater of (i) up to 125% of the amount being converted, depending on the nature of the default, and (ii) the product of (a) the number of shares of Common Stock issuable upon conversion of the Note, times (b) 125% of the highest closing sale price of the Common Stock during the period beginning on the date immediately preceding such event of default and ending on the trading day immediately prior to the trading day that the redemption price is paid by us.

We have the right, at any time after one year from the Closing Date, to redeem all, but not less than all, of the outstanding Notes, upon not less than 20 trading days nor more than 30 trading days prior written notice. The redemption price shall equal 120% of the amount of principal and interest being redeemed.

The Buyers agree to restrict their ability to convert the Notes and/or exercise the Warrants and receive shares of our Common Stock such that the number of shares of Common Stock held by the Buyer in the aggregate and its affiliates after such conversion or exercise does not exceed 9.99% of the then issued and outstanding shares of our Common Stock.

Pursuant to the Registration Rights Agreement, we agreed to file a registration statement with the SEC, within 30 days following receipt of a request from a Buyer (or 45 days with respect to an underwritten offering), covering such shares of common stock issuable upon conversion of the Notes or exercise of the Warrants, as requested by the Buyers, and have such registration statement declared effective by the SEC within 90 days thereafter. We also agreed to notify the Buyers if we at any time propose to register any of our securities under the Securities Act of 1933, as amended, and of such Buyers’ right to participate in such registration.

If we fail to comply with the registration statement filing, effective date or maintenance date filing requirements, we are required to pay the Buyers a registration delay payment in cash equal to 2% of the Buyer’s original principal amount stated on such Investors’ Note as of the Closing Date on the date of each failure, and on every thirty (30) day anniversary of the of the respective failures (Registration Delay Payment). Notwithstanding the foregoing, in no event shall the aggregate amount of Registration Delay Payments exceed 10% of such Investor’s original principal amount stated on the Note on the Closing Date. We account for such Registration Delay Payments as contingent liabilities as defined in ASC. Accordingly, we recognize such damages when it becomes probable that they will be incurred and amounts are reasonably estimable.

Pursuant to the Guaranty, our subsidiaries guaranteed to the collateral agent, for the benefit of the Buyers, the punctual payment, as and when due and payable, of all amounts owed by us in respect of the Purchase Agreement, the Notes and the other transaction documents executed in connection with the Purchase Agreement.

Pursuant to the Security Agreement, we and our subsidiaries granted, in favor of the collateral agent for the Buyers, a continuing security interest in all our personal property and assets, as collateral security for our and the subsidiaries under the Purchase Agreement, the Notes, the Guaranty and the other transaction documents.

#### Sovereign Bank Credit Agreement

On January 27, 2012, we entered into the Credit Agreement with Sovereign, which was amended May 3, 2012, and again on August 31, 2012. The Credit Agreement, as amended, provided for a revolving line of credit in an amount not to exceed $2,000,000 and letters of credit in an amount not to exceed $200,000. As more fully described above, on December 5, 2012, the outstanding borrowings under the Credit Agreement were repaid in full and the Credit Agreement terminated.

#### Hartford and Lakewood Operations Asset Sales

On July 25, 2012, the Company and the Hartford and Lakewood Operations entered into the Asset Purchase Agreement, pursuant to which the Hartford and Lakewood Operations sold substantially all of their assets to two newly-created subsidiaries of Kavveri for a purchase price of $5.5 million in cash, subject to adjustment, and the assumption of their various liabilities. At closing, we received $4.9 million in cash, and the remaining $600,000 of the purchase price is to be placed in escrow pursuant to the Asset Purchase Agreement. We used the proceeds from this sale to repay the full amount outstanding under the Credit Agreement of $4,022,320 as of July 25, 2012. The difference of $877,680 was deposited in our operating cash account.

The parties agreed to place $350,000 of the purchase price into escrow pending assignment of certain contracts post-closing, with us receiving those funds upon successful assignment of the contracts. The remaining $250,000 was to be escrowed for purposes of satisfying certain adjustments to the purchase price based on a final net asset valuation to be completed after closing as well as repurchase obligations of certain delinquent accounts receivable. No later than three days after the final determination of the net asset valuation, the purchasers are required to deposit the $600,000 into escrow.

To date, we have not reached agreement with Kavveri with regard to resolving the net asset valuation. On January 28, 2013, Kavveri submitted a revised aggregate claim for indemnification by us of approximately $1,511,000 with regard to (1) net asset valuation claim owed of approximately $698,000, which included accounts receivable deemed uncollectible of $519,000 related to a project that was completed by our former Hartford Operations and accepted by the customer on or prior to the Closing Date; and (2) delinquent account receivables to be repurchased of approximately $813,000.

On February 27, 2013, we notified Kavveri that we disputed these claims. Among other things, we dispute the amount of the delinquent receivables, and believe that after consideration of reserves for uncollectible accounts and other offsets previously considered in its calculation of the net asset valuation, the total amount of accounts receivable deemed uncollectible for repurchase to be approximately $36,000. However, we contend that Kavveri missed the deadline to notify us regarding the repurchase of delinquent receivables pursuant to the terms of the Asset Purchase Agreement regarding timing for notification to us, which would eliminate any repurchase payment owed by us to Kavveri. We also believe that the $519,000 of accounts receivable claimed for indemnification by Kavveri is without merit. Finally, we also dispute the net asset valuation claim, and believe Kavveri owes us approximately $58,000, following our evaluation of the uncollectible accounts receivable. With regard to the net asset valuation claim, if the parties disagree, and if they are unable to come to an agreement, the matter will be submitted to one or more independent, nationally-recognized accounting firms for final determination. As of the date of this annual report, no matters have been submitted to the independent accounting firm.

#### Short-Term Commitments with the China Operations

On August 2, 2012, the China Operations entered into a secured loan with the Bank of China (the Short-Term Bank Loan). The Short-Term Bank Loan provides for a loan in the amount of $2,432,205. The proceeds from the Short-Term Bank Loan were used to repay outstanding unsecured loans of $2,404,545 due to its joint venture partner, Taian Gas Group (TGG). The Short-Term Bank Loan has an interest rate of 7.38%, and interest is due on a quarterly basis.

#### Other Payable with Zurich

On July 12, 2012, we executed the Financing Agreement with Zurich, to assist in the completion of the project contract with the Owner or Cooper Project. Under the terms of the Financing Agreement, Zurich advanced us $793,927 to assist in the completion of the Cooper Project, a $16.2 million project completed by our Trenton Operations. We were to repay Zurich the financial advances by September 2012, however we were in default under the terms of the Financing Agreement as we did not repay Zurich the $793,927, and Zurich paid certain of the our vendors pursuant to Zurich’s obligations under its payment bond on the Cooper Project. In addition, we are contingently liable to Zurich and its affiliate F&D under the Indemnity Agreement. Zurich and F&D, as surety, have issued certain performance and payment bonds on behalf of owners or customers regarding the Company’s work on various projects under the Indemnity Agreement. The Company agrees to indemnify the surety for any payments made by Zurich on contracts of suretyship, guaranty or indemnity.

Furthermore regarding Zurich, F&D and the Indemnity Agreement, on April 17, 2013, we executed the Forbearance Agreement with Zurich, which supersedes the Financing Agreement. As of April 16, 2013, the total Loss Amount due Zurich under the Forbearance Agreement less payments received by Zurich was $2,836,668. Under the Forbearance Agreement, among other things, the parties have agreed to the following payments which will be credited against the Loss Amount owed to Zurich by us: (1) the Interim Liability Payments; (2) the Customer Payments; and (3) the Claim, up to the Loss Amount as it exists at the time. As of April 30, 2013, the net Other Payable for the Loss Amount owed Zurich under the Forbearance Agreement was $1,743,986, which includes the initial Interim Liability Payments of $25,000 per month, and $1,090,604 of additional contract accounts receivable representing future Customer Payments and $22,922 of additional accounts payable assigned to Zurich which were reclassed from consolidated accounts receivable and accounts payable, respectively. As of the date of this annual report, the Loss Amount owed to Zurich is approximately $1,634,000 following Interim Liability and Customer Payments made subsequent to April 30, 2013.

Each or any of the following shall constitute an event of default under the Forbearance Agreement: (a) failure by us to make any of the Interim Liability Payments; (b) failure by us to remit any Customer Payments received; (c) the failure by us or the Owner to remit the proceeds of the Claim to Zurich; and (d) any Loss Amount that still exists as of December 31, 2013. We are currently in compliance with the terms of the Forbearance Agreement.

We have submitted a revised Claim and request for equitable adjustment to the Owner in the amount of $2,421,425 for significant delays, disruptions and construction changes that were beyond its control and required the Company to perform additional work. We are currently in negotiations with the Owner to settle the Claim. The next step in the resolution process as set forth in the contract with the Owner is mandatory non-binding mediation through the AAA. On April 15, 2013, we filed a Mediation request with the AAA with regard to the Claim. We are awaiting a response from the Owner, and as such no date has been established for the Mediation. If we are successful in the settlement of this Claim, we expect to use the proceeds from the Claim to repay Zurich the Loss Amount as it exists at the time. There can be no assurance that we will be successful in settling with the Owner for all or a portion of the submitted claim.

#### Going Concern

Our continuation as a going concern beyond the next twelve months and our ability to discharge our liabilities and commitments in the normal course of business is ultimately dependent upon the execution of its future plans, which include the following: (1) its ability to generate future operating income, reduce operating expenses and produce cash from its operating activities, which will be affected by general economic, competitive, and other factors, many of which are beyond the Company's control (2) the repayment of, or the modification of the terms under the Zurich Forbearance Agreement; (3) the settlement of the Claim with the Owner; and (4) obtaining additional funds, either through debt or equity financing. There can be no assurance that the execution of one more of alternatives described above to repay Zurich, or waiver or modification of terms under the Zurich Forbearance Agreement will be successful to ensure the Company’s continuation as a going concern, which would have a serious adverse effect on the Company’s business, operations and future prospects.

### Backlog

As of April 30, 2013, we had a backlog of unfilled orders of approximately $26.4 million compared to approximately $23.6 million at April 30, 2012. We define backlog as the value of work-in-hand to be provided for customers as of a specific date where the following conditions are met (with the exception of engineering change orders): (i) the price of the work to be done is fixed; (ii) the scope of the work to be done is fixed, both in definition and amount; and (iii) there is an executed written contract, purchase order, agreement or other documentary evidence which represents a firm commitment by the customer to pay us for the work to be performed. These backlog amounts are based on contract values and purchase orders and may not result in actual receipt of revenue in the originally anticipated period or at all. We have experienced variances in the realization of our backlog because of project delays or cancellations resulting from external market factors and economic factors beyond our control and we may experience such delays or cancellations in the future. Backlog does not include new firm commitments which may be awarded to us by our customers from time to time in future periods. These new project awards could be started and completed in this same future period. Accordingly, our backlog does not necessarily represent the total revenue that could be earned by us in future periods.

### Off-Balance Sheet Arrangements

We have no off-balance sheet arrangements other than operating lease commitments.

### Critical Accounting Policies

Financial Reporting Release No. 60, published by the SEC, recommends that all companies include a discussion of critical accounting policies used in the preparation of their financial statements. While all these significant accounting policies impact our financial condition and results of operations, we view certain of these policies as critical. Policies determined to be critical are those policies that have the most significant impact on our consolidated financial statements and require management to use a greater degree of judgment and estimates. Actual results may differ from those estimates.

We believe that given current facts and circumstances, it is unlikely that applying any other reasonable judgments or estimate methodologies would cause a material effect on our consolidated results of operations, financial position or liquidity for the periods presented in this report.

The accounting policies identified as critical are as follows:

#### Use of Estimates

In preparing financial statements in conformity with accounting principles generally accepted in the United States of America, management is required to make estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the date of the financial statements and revenue and expenses during the reporting period. The most significant estimates relate to the calculation of percentage-of-completion on uncompleted contracts, allowance for doubtful accounts, valuation of inventory, realization of deferred tax assets, amortization method and lives of customer lists, acquisition-related contingency consideration and estimates of the fair value of reporting units and discounted cash flows used in determining whether goodwill has been impaired. Actual results could differ from those estimates.

#### Accounts Receivable

Accounts receivable are due within contractual payment terms and are stated at amounts due from customers net of an allowance for doubtful accounts. Credit is extended based on evaluation of a customer's financial condition. Accounts that are outstanding longer than the contractual payment terms are considered past due. We determine our allowance by considering a number of factors, including the length of time trade accounts receivable are past due, our previous loss history, the customer's current ability to pay its obligation to the us, and the condition of the general economy and the industry as a whole. We write off accounts receivable when they become uncollectible, and payments subsequently received on such receivables are credited to the allowance for doubtful accounts.

#### Derivative Instruments

Derivative liabilities are related to embedded conversion features of the Notes and the common stock Warrants issued in connection with the Purchase Agreement. For derivative instruments that are accounted for as liabilities, the derivative instrument is initially recorded at its fair value and is then re-valued at each reporting date, with changes in fair value recognized in earnings each reporting period. We use the binomial lattice model to value the derivative instruments at inception and subsequent valuation dates and the value is re-assessed at the end of each reporting period, in accordance with ASC 815. Derivative instrument liabilities are classified in the balance sheet as current or non-current based on whether or not the net-cash settlement of the derivative instrument could be required within twelve months of the balance sheet date.

#### Fair Value of Financial Instruments

Our material financial instruments at April 30, 2013 and for which disclosure of estimated fair value is required by certain accounting standards consisted of cash and cash equivalents, accounts receivable, account payable, Notes, common stock Warrants and loans payable. The fair values of cash and cash equivalents, accounts receivable, and account payable are equal to their carrying value because of their liquidity and short-term maturity. The fair values of the Notes and common stock Warrants are accounted for in accordance with ASC 815. We believe that the fair values of the loans payable do not differ materially from their aggregate carrying values in that substantially all the obligations bear variable interest rates that are based on market rates or interest rates that are periodically adjustable to rates that are based on market rates.

#### Goodwill and Other Long-lived Assets

We assess the impairment of long-lived assets whenever events or changes in circumstances indicate that their carrying value may not be recoverable from the estimated future cash flows expected to result from their use and eventual disposition. Our long-lived assets subject to this evaluation include property and equipment and amortizable intangible assets. We assess the impairment of goodwill annually as of April 30 and whenever events or changes in circumstances indicate that it is more likely than not that an impairment loss has been incurred. Intangible assets other than goodwill are reviewed for impairment whenever events or changes in circumstances indicate that the carrying value may not be fully recoverable. We are required to make judgments and assumptions in identifying those events or changes in circumstances that may trigger impairment. Some of the factors we consider include a significant decrease in the market value of an asset, significant changes in the extent or manner for which the asset is being used or in its physical condition, a significant change, delay or departure in our business strategy related to the asset, significant negative changes in the business climate, industry or economic condition, or current period operating losses, or negative cash flow combined with a history of similar losses or a forecast that indicates continuing losses associated with the use of an asset.

As a result of performing our annual step one testing for goodwill impairment, we determined that the carrying value of Pride, included in our Australia Operations, exceeded its fair value, thus failing the first step of the goodwill impairment test, primarily driven by current operating results and economic climate in Pride’s operations. We performed the step one goodwill impairment analysis using Level 3 measurement as defined in the ASC. The Level 3 measurements were based on significant inputs not observable in the market. These measurements included a discounted cash flow valuation technique, using an estimated discount rate of 15.6%, future short and long term revenue growth rates ranging from 2.5% to 3.0%, gross margin of 30%, and selling general and administrative expenses ranging from 25% to 29% of revenue. Based on the results of the step one testing, we completed the second step of the goodwill impairment test, which included calculating an implied fair value of the goodwill of Pride, by allocating the fair values of substantially all of its individual assets, liabilities and identified intangible assets, as if this reporting unit had been acquired in a business combination, which resulted in no allocation of fair value to goodwill. As a result, we recorded a goodwill impairment charge of $1,936,000 in the fourth quarter of fiscal 2013 ended April 30, 2013. This impairment charge is noncash charge that does not impact our consolidated cash flows or adjusted EBITDA.

At April 30, 2012, we determined that the customer lists for the Hartford and Trenton reporting units were impaired due to projected future operating performance. As a result, we recorded impairment charges regarding these customer lists of $168,604. For these impairment charges, we used a discounted cash flow valuation technique to determine that the carrying value of these customer lists exceeded the fair value. These impairment charges are noncash charges that do not impact our consolidated cash flows or adjusted EBITDA.

#### Deferred Income Taxes

We determine deferred tax liabilities and assets at the end of each period based on the future tax consequences that can be attributed to net operating loss carryovers and differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases, using the tax rate expected to be in effect when the taxes are actually paid or recovered. The recognition of deferred tax assets is reduced by a valuation allowance if it is more likely than not that the tax benefits will not be realized. The ultimate realization of deferred tax assets depends upon the generation of future taxable income during the periods in which those temporary differences become deductible.

In 2013, the valuation allowance was increased to offset the foreign net deferred tax assets as we determined it was not more likely than not that these assets would be realized. At April 30, 2013, our net deferred tax assets are fully offset by a valuation allowance. We will continue to evaluate the realization of our deferred tax assets and liabilities on a periodic basis, and will adjust such amounts in light of changing facts and circumstances.

We consider past performance, expected future taxable income and prudent and feasible tax planning strategies in assessing the amount of the valuation allowance. Our forecast of expected future taxable income is based over such future periods that we believe can be reasonably estimated. Changes in market conditions that differ materially from our current expectations and changes in future tax laws in the U.S. may cause us to change our judgments of future taxable income. These changes, if any, may require us to adjust our existing tax valuation allowance higher or lower than the amount we have recorded.

#### Revenue Recognition

We generate our revenue by providing design-build engineering services for communications infrastructure. Our engineering services report revenue pursuant to customer contracts that span varying periods of time. We report revenue from contracts when persuasive evidence of an arrangement exists, fees are fixed or determinable, and collection is reasonably assured.

We record revenue and profit from long-term contracts on a percentage-of-completion basis, measured by the percentage of contract costs incurred to date to the estimated total costs for each contract. Contracts in process are valued at cost plus accrued profits less earned revenues and progress payments on uncompleted contracts. Contract costs include direct materials, direct labor, third party subcontractor services and those indirect costs related to contract performance. Contracts are generally considered substantially complete when engineering is completed and/or site construction is completed.

We have numerous contracts that are in various stages of completion. Such contracts require estimates to determine the appropriate cost and revenue recognition. Cost estimates are reviewed monthly on a contract-by-contract basis, and are revised periodically throughout the life of the contract such that adjustments to profit resulting from revisions are made cumulative to the date of the revision. Significant management judgments and estimates, including the estimated cost to complete projects, which determines the project’s percent complete, must be made and used in connection with the revenue recognized in the accounting period. Current estimates may be revised as additional information becomes available. If estimates of costs to complete long-term contracts indicate a loss, provision is made currently for the total loss anticipated.

The length of our contracts varies. Assets and liabilities related to long-term contracts are included in current assets and current liabilities as they will be liquidated in the normal course of contract completion, although this may require more than one year.

We record revenue and profit from short-term contracts for our China Operations under the completed contract method, whereas income is recognized only when a contract is completed or substantially completed. Accordingly, during the period of performance, billings and costs are accumulated on the balance sheet, but no revenue or income is recorded before completion or substantial completion of the work. Our decision is based on the short-term nature of the work performed.

We also recognize certain revenue from short-term contracts when equipment is delivered or the services have been provided to the customer. For maintenance contracts, revenue is recognized ratably over the service period.

### Recently Issued Accounting Pronouncements

In December 2011, the Financial Accounting Standards Board (FASB) issued ASU No. 2011-11 (ASU 2011-11), Disclosures about Offsetting Assets and Liabilities where entities are required to disclose both gross information and net information about both instruments and transactions eligible for offset in the balance sheet and instruments and transactions subject to an agreement similar to a master netting arrangement. This scope would include derivatives, sale and repurchase agreements, and reverse sale and repurchase agreements, and securities borrowing and securities lending arrangements. These disclosures assist users of financial statements in evaluating the effect or potential effect of netting arrangements on a company’s financial position. We are required to apply the amendments for our annual reporting period beginning May 1, 2013. We do not expect the provisions of ASU 2011-11 to have a material impact on our consolidated financial statements.

## Controls and procedures

As filed, 2,932 characters.

#### (a) Evaluation of disclosure controls and procedures.

Our management, with the participation of our chief executive officer and chief financial officer, evaluated the effectiveness of our disclosure controls and procedures pursuant to Rule 13a-15 under the Exchange Act, as of the end of the period covered by this Annual Report on Form 10-K. In designing and evaluating the disclosure controls and procedures, management recognizes that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving the desired control objectives. In addition, the design of disclosure controls and procedures must reflect the fact that there are resource constraints and that management is required to apply its judgment in evaluating the benefits of possible controls and procedures relative to their costs.

Based on management’s evaluation, our chief executive officer and chief financial officer concluded that, as of April 30, 2013, our disclosure controls and procedures are designed at a reasonable assurance level and are effective to provide reasonable assurance that information we are required to disclose in reports that we file or submit under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in SEC rules and forms, and that such information is accumulated and communicated to our management, including our chief executive officer and chief financial officer, as appropriate, to allow timely decisions regarding required disclosure.

#### (b) Changes in internal control over financial reporting.

There were no changes in our internal control over financial reporting that occurred during the quarter ended April 30, 2013 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

#### (c) Management’s report on internal control over financial reporting.

Our management is responsible for establishing and maintaining adequate internal control over financial reporting, as defined in Exchange Act Rule 13a-15(f). Management conducted an evaluation of the effectiveness of our internal control over financial reporting based on the framework in Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this evaluation, management concluded that our internal control over financial reporting was effective as of April 30, 2013.

This annual report does not include an attestation report by CohnReznick LLP, our independent registered public accounting firm, regarding internal control over financial reporting. As a smaller reporting company, our management's report was not subject to attestation by our independent registered public accounting firm pursuant to rules of the Securities and Exchange Commission that permit us to provide only management's report in this annual report.

Filed Jul 29, 2013.
Source: SEC EDGAR, the filing index for accession 0001144204-13-041652. Last ingested by Listed: Nov 23, 2026, 05:25 ET. No prices; not investment advice.
