# Sterling Infrastructure, Inc.: Form 10-Q for the period ended Sep 30, 2015

- Company: [Sterling Infrastructure, Inc.](/companies/strl.md) (CIK 874238)
- Form: 10-Q
- Filed: 2015-11-09
- Accepted by EDGAR: Nov 9, 2015, 06:05 ET
- Period: 2015-09-30
- Accession: 0001171843-15-006116
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/874238/000117184315006116/gff10q_110915.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/874238/000117184315006116/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2015-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2015-07-01 to 2015-09-30 | $176.0m | us-gaap:Revenues |
| Revenue | 9 months, 2015-01-01 to 2015-09-30 | $471.1m | us-gaap:Revenues |
| Cost of revenue | 3 months, 2015-07-01 to 2015-09-30 | $161.5m | us-gaap:CostOfGoodsSold |
| Cost of revenue | 9 months, 2015-01-01 to 2015-09-30 | $454.4m | us-gaap:CostOfGoodsSold |
| Gross profit | 3 months, 2015-07-01 to 2015-09-30 | $14.5m | us-gaap:GrossProfit |
| Gross profit | 9 months, 2015-01-01 to 2015-09-30 | $16.7m | us-gaap:GrossProfit |
| Operating income | 3 months, 2015-07-01 to 2015-09-30 | $2.4m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2015-01-01 to 2015-09-30 | −$14.5m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2015-07-01 to 2015-09-30 | −$39.0k | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2015-01-01 to 2015-09-30 | −$8.0k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2015-07-01 to 2015-09-30 | $256.0k | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2015-01-01 to 2015-09-30 | −$19.3m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2015-07-01 to 2015-09-30 | $0.01 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2015-01-01 to 2015-09-30 | −$1.00 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2015-07-01 to 2015-09-30 | $0.01 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2015-01-01 to 2015-09-30 | −$1.00 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2015-07-01 to 2015-09-30 | 19,627,674 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2015-01-01 to 2015-09-30 | 19,269,123 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2015-01-01 to 2015-09-30 | $3.5m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 9 months, 2015-01-01 to 2015-09-30 | $7.1m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2015-09-30 | $11.5m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2015-09-30 | $157.2m | us-gaap:AssetsCurrent |
| Total assets | at 2015-09-30 | $290.7m | us-gaap:Assets |
| Current liabilities | at 2015-09-30 | $115.6m | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2015-09-30 | $30.5m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2015-09-30 | $5.2m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2015-09-30 | $115.5m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 38,239 characters.

### Cautionary Comment Regarding Forward-Looking Statements

This Report includes statements that are, or may be considered to be, “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, or the Securities Act, and Section 21E of the Securities Exchange Act of 1934, as amended, or the Exchange Act. These forward-looking statements are included throughout this Report, including in this section, “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” and relate to matters such as our industry, business strategy, goals and expectations concerning our market position, future operations, margins, profitability, capital expenditures, liquidity and capital resources and other financial and operating information. We have used the words “anticipate,” “assume,” “believe,” “budget,” “continue,” “could,” “estimate,” “expect,” “forecast,” “future,” “intend,” “may,” “plan,” “potential,” “predict,” “project,” “should,” “will,” “would” and similar terms and phrases to identify forward-looking statements in this Report.

Forward-looking statements reflect our current expectations as of the date of this Report regarding future events, results or outcomes. These expectations may or may not be realized. Some of these expectations may be based upon assumptions or judgments that prove to be incorrect. In addition, our business and operations involve numerous risks and uncertainties, many of which are beyond our control, that could result in our expectations not being realized or otherwise could materially affect our financial condition, results of operations and cash flows.

Actual events, results and outcomes may differ materially from our expectations due to a variety of factors. Although it is not possible to identify all of these factors, they include, among others, the following:

- changes in general economic conditions, including recessions, reductions in federal, state and local government funding for infrastructure services and changes in those governments’ budgets, practices, laws and regulations;
- delays or difficulties related to the completion of our projects, including additional costs, reductions in revenues or the payment of liquidated damages, or delays or difficulties related to obtaining required governmental permits and approvals;
- actions of suppliers, subcontractors, design engineers, joint venture partners, customers, competitors, banks, surety companies and others which are beyond our control, including suppliers’, subcontractors’, and joint venture partners’ failure to perform;
- factors that affect the accuracy of estimates inherent in our bidding for contracts, estimates of backlog, percentage-of-completion accounting policies, including onsite conditions that differ materially from those assumed in our original bid, contract modifications, mechanical problems with our machinery or equipment and effects of other risks discussed in this document;
- design/build contracts which subject us to the risk of design errors and omissions;
- cost escalations associated with our contracts, including changes in availability, proximity and cost of materials such as steel, cement, concrete, aggregates, oil, fuel and other construction materials, and cost escalations associated with subcontractors and labor;
- our dependence on a limited number of significant customers;
- adverse weather conditions; although we prepare our budgets and bid contracts based on historical rain and snowfall patterns, the incidence of rain, snow, hurricanes, etc., may differ materially from these expectations;
- the presence of competitors with greater financial resources or lower margin requirements than ours, and the impact of competitive bidders on our ability to obtain new backlog at reasonable margins acceptable to us;
- our ability to successfully identify, finance, complete and integrate acquisitions;
- citations issued by any governmental authority, including the Occupational Safety and Health Administration;
- federal, state and local environmental laws and regulations where non-compliance can result in penalties and/or termination of contracts as well as civil and criminal liability;
- adverse economic conditions in our markets; and
- the other factors discussed in more detail in our Annual Report on Form 10-K for the year ended December 31, 2014 (“2014 Form 10-K”) under “Item 1A. — Risk Factors.”

In reading this Report, you should consider these factors carefully in evaluating any forward-looking statements and you are cautioned not to place undue reliance on any forward-looking statements. Although we believe that our plans, intentions and expectations reflected in, or suggested by, the forward-looking statements that we make in this Report are reasonable, we can provide no assurance that they will be achieved.

*The forward-looking statements included in this Report are made only as of the date of this Report, and we undertake no obligation to update any information contained in this Report or to publicly release the results of any revisions to any forward-looking statements to reflect events or circumstances that occur, or that we become aware of after the date of this Report, except as may be required by applicable securities laws.*

### Overview

Sterling Construction Company, Inc. (“Sterling” or “the Company”), is a leading heavy civil construction company that specializes in building and reconstruction of transportation and water infrastructure projects in Texas, Utah, Nevada, Arizona, California, Hawaii, and other states in which there are profitable construction opportunities. Its transportation infrastructure projects include highways, roads, bridges, airfields and light rail. Its water infrastructure projects include water, wastewater and storm drainage systems.

Although we describe our business in this Report in terms of the services we provide, our base of customers and the geographic areas in which we operate, we have concluded that our operations consist of one reportable segment, one operating segment and one reporting unit component: heavy civil construction. In making this determination, the Company considered the discrete financial information used by our Chief Operating Decision Maker (“CODM”). Based on this approach, the Company noted that the CODM organizes, evaluates and manages the financial information around each heavy civil construction project when making operating decisions and assessing the Company’s overall performance. Furthermore, we considered that each heavy civil construction project has similar characteristics, includes similar services, has similar types of customers and is subject to similar economic and regulatory environments.

Sterling has grown its service profile and geographic reach both organically and through acquisitions. Expansions into Utah, Arizona and California were achieved with the 2009 acquisition of RLW and the 2011 acquisitions of JBC and Myers, respectively. These acquisitions also extended Sterling’s service profiles. For a more detailed discussion of the Company’s business, readers of this report are advised to review “Item 1, Business,” of the 2014 Form 10-K.

For purposes of the discussions which follow, “Current Quarter” refers to the three-month period ended September 30, 2015, “Prior Quarter” refers to the three-month period ended September 30, 2014, “Current Period” refers to the nine-month period ended September 30, 2015, and “Prior Period” refers to the nine-month period ended September 30, 2014.

### Financial Results for the Current Quarter and Current Period, Operational Issues and Outlook for 2015 Financial Results

In the Current Quarter and Current Period, we had an operating income (loss) of $2.4 million and $(14.5) million, respectively, income (loss) before income taxes and earnings attributable to noncontrolling interest owners of $1.3 million and $(16.3) million, respectively, net income (loss) attributable to Sterling common stockholders of $0.3 million and $(19.3) million, respectively, and net income (loss) per diluted share attributable to Sterling common stockholders of $0.01 and (1.00), respectively.

Revenues for the Current Quarter and the Current Period decreased 7.0% and 9.2% from the Prior Quarter and Prior Period, respectively. The decrease in the Current Quarter as compared to the Prior Quarter is primarily related to the completion of large projects in Texas which were ongoing in the Prior Quarter, slightly offset with increased revenue from projects under construction in Utah. The decrease in the Current Period as compared to the Prior Period is primarily the result of downward percent-complete revisions made to certain projects in the first quarter of 2015, largely related to construction projects in Texas, combined with the completion of certain large projects in Texas which were ongoing in the Prior Period and a $2.8 million out-of-period decrease in revenue that was recorded in the first quarter of 2015 and was the result of our first quarter review of projects.

Our gross margins increased to 8.2% in the Current Quarter as compared to 4.4% in the Prior Quarter and decreased to 3.6 % in the Current Period as compared to 5.5% in the Prior Period. The increase in gross margin during the Current Quarter as compared to the Prior Quarter was primarily the result of the Prior Quarter’s downward revision of gross profits related to three problem jobs. The decrease in the Current Period as compared to the Prior Period is a result of the downward percent-complete revisions made to certain projects in the first quarter of 2015, largely related to construction projects in Texas, along with unseasonably more rainfall during the second quarter of 2015, also in Texas, which caused declines in productivity and unanticipated delays.

Our highway and related bridge work is generally funded through federal and state authorizations. In recent years, federal and state legislation related to infrastructure spending has been slow to pass. Funding for federal highway projects primarily originates from the Highway Trust Fund where federal motor fuel taxes are the major source of income into the fund. Additional income is provided from the General Fund and certain other funds to maintain the solvency of the Highway Trust Fund, as sources of income remain a challenge. While government spending on highway and related bridge work has not significantly increased in recent years, we have won sufficient work to keep our backlog above $700 million, and total backlog was $718 million at September 30, 2015. In addition to highway and related bridge work, we continually look for projects that diversify our book of projects to obtain higher margins and to thereby relieve the continued pressure on our gross margins from new contract awards from local, state and federal authorities that are typically more competitive.

See “Item 1. Business— Our Markets, Competition and Customers” in the 2014 Form 10-K for a more detailed discussion of our markets and their funding sources.

### Results of Operations

#### Backlog at September 30, 2015

At September 30, 2015, our backlog of construction projects was $718 million, as compared to $764 million at December 31, 2014. Our contracts are typically completed in 12 to 36 months. At September 30, 2015, approximately $112 million was excluded from our consolidated backlog for projects in which we were the apparent low bidder, but had not yet been formally awarded the contract or the contract price had not been finalized. Backlog includes $11 million attributable to our share of estimated revenues related to joint ventures where we are a noncontrolling joint venture partner.

#### Results of Operations for the Current Quarter as Compared to the Prior Quarter and for the Current Period as compared to the Prior Period

|  | Three Months Ended September 30, 2015 | 2014 | % Change | Nine Months Ended September 30, 2015 | 2014 | % Change |
| --- | ---: | ---: | --- | ---: | ---: | --- |
| Revenues | $176,000 | $189,275 | (7.0)% | $471,107 | $518,618 | (9.2)% |
| Gross profit | $14,458 | $8,356 | 73.0 | $16,733 | $28,724 | (41.7) |
| General and administrative expenses | (11,119) | (9,326) | 19.2 | (32,320) | (27,316) | 18.3 |
| Other operating (expense) income, net | (958) | (603) | 58.9 | 1,128 | (4) | NM |
| Operating income (loss) | 2,381 | (1,573) | NM | (14,459) | 1,404 | NM |
| Interest income | 32 | 113 | (71.7) | 464 | 644 | (28.0) |
| Interest expense | (1,087) | (211) | NM | (2,103) | (766) | NM |
| Loss on extinguishment of debt | – | – | NM | (240) | – | NM |
| Income (loss) before taxes and earnings attributable to noncontrolling interests | 1,326 | (1,671) | NM | (16,338) | 1,282 | NM |
| Income tax benefit (expense) | 39 | (546) | NM | 8 | (573) | NM |
| Net income (loss) | 1,365 | (2,217) | NM | (16,330) | 709 | NM |
| Noncontrolling owners’ interests in earnings of subsidiaries and joint ventures | (1,109) | (1,718) | (35.4) | (2,948) | (3,238) | (9.0) |
| Net income (loss) attributable to Sterling common stockholders | $256 | $(3,935) | NM | $(19,278) | $(2,529) | NM |
| Gross margin | 8.2% | 4.4% | 86.4 | 3.6% | 5.5% | (34.5) |
| Operating margin (deficit) | 1.4% | (0.8)% | NM | (3.1)% | 0.3% | NM |

*NM – Not meaningful.*

|  | Amount as of September 30, 2015 | June 30, 2015 | December 31, 2014 |
| --- | ---: | ---: | ---: |
| Contract Backlog, end of period | $718,000 | $743,000 | $764,000 |

23

#### Revenues

Revenues decreased $13.3 million, or 7.0%, in the Current Quarter compared with the Prior Quarter and decreased $47.5 million, or 9.2%, for the Current Period compared with the Prior Period. The decrease in the Current Quarter as compared to the Prior Quarter is primarily related to the completion of large projects in Texas which were ongoing in the Prior Quarter, slightly offset with increased revenue from projects under construction in Utah. The decrease in the Current Period as compared to the Prior Period is primarily the result of downward percent-complete revisions made to certain projects in the first quarter of 2015, largely related to construction projects in Texas, combined with the completion of certain large projects in Texas which were ongoing in the Prior Period and a $2.8 million out-of-period decrease in revenue that was recorded in the first quarter of 2015 and was the result of our first quarter review of projects.

#### Gross Profit

Gross profit increased $6.1 million for the Current Quarter compared with the Prior Quarter and decreased $12.0 million for the Current Period compared with the Prior Period. Gross margins increased to 8.2% in the Current Quarter from a margin of 4.4% in the Prior Quarter and decreased to 3.6% in the Current Period from 5.5% in the Prior Period. The increase in gross margin during the Current Quarter as compared to the Prior Quarter was primarily the result of the Prior Quarter’s downward revision of gross profits related to three problem jobs. The decrease in the Current Period as compared to the Prior Period is a result of the downward percent-complete revisions made to certain projects in the first quarter of 2015, largely related to construction projects in Texas, along with unseasonably more rainfall during second quarter of 2015, also in Texas, which caused declines in productivity and unanticipated delays.

At September 30, 2015 and 2014, we had approximately 133 and 113 contracts-in-progress, respectively, which were less than 90% complete. These contracts are of various sizes, of different expected profitability and in various stages of completion. The nearer a contract progresses toward completion, the more we are able to refine our estimate of total revenues (including incentives, delay penalties and change orders), costs and gross profit. Thus, gross profit as a percent of revenues can increase or decrease from comparable and subsequent quarters due to variations among contracts and depending upon the stage of completion of contracts.

#### General and Administrative Expenses

General and administrative expenses increased $1.8 million to $11.1 million during the Current Quarter from $9.3 million in the Prior Quarter and increased $5.0 million to $32.3 million in the Current Period from $27.3 million in the Prior Period. The increase in the Current Quarter as compared to the Prior Quarter is primarily the result of certain non-recurring costs related to consulting and employee severance payments of $1.1 million and $0.5 million, respectively. The increase during the Current Period as compared to the Prior Period is primarily the result of certain non-recurring costs related to consulting and employee severance payments of $1.2 million and $2.9 million, respectively, recognized in the Current Period.

As a percent of revenues, general and administrative expenses increased 1.4% to 6.3% and 1.6% to 6.9% in the Current Quarter and Current Period, respectively, compared with 4.9% and 5.3% in the Prior Quarter and Prior Period, respectively. The increases in general and administrative expenses, as a percentage of revenue, for the Current Quarter and Current Period are primarily the result of the non-recurring consulting and employee severance costs paid in the first quarter of 2015 and the decline in revenue mentioned above. Excluding these non-recurring costs, general and administrative expenses would have been 5.4% and 6.0% for the Current Quarter and the Current Period, respectively.

#### Income Taxes

Our effective income tax rates for the Current and Prior Quarter were (2.9)% and (32.7)%, respectively. The Company is not expecting a current federal tax liability for 2015. The Company does expect a state tax liability for 2015 in states without sufficient net operating loss carry forwards. Therefore, a current tax expense has been recorded for those states for the three and nine months ended September 30, 2015. Additionally, we have recorded a current tax benefit for the increase in our state tax receivable. In the Current Quarter and Prior Quarter, the effective income tax rate varied from the statutory rate primarily as a result of the change in the valuation allowance, net income attributable to noncontrolling interest owners which is taxable to those owners rather than to the Company, state income taxes, and other permanent differences.

In order to determine that a valuation allowance was necessary, management assessed the available positive and negative evidence to estimate whether sufficient future taxable income would be generated to use the existing deferred tax assets. A significant piece of objective negative evidence evaluated was the cumulative loss incurred over the three-year period ended September 30, 2015. Such objective evidence limits the ability to consider other subjective evidence such as our projections for future growth. The ability to realize deferred tax assets and the need for a valuation allowance is evaluated and assessed quarterly. The amount of the deferred tax asset considered realizable could be adjusted if objective negative evidence or cumulative losses are no longer present, and additional weight may be given to subjective evidence such as our projections for growth. For the nine months ended September 30, 2015, there was no change in management’s assessment of the amount of deferred tax asset considered realizable from the assessment made at December 31, 2014.

#### Goodwill

During the first quarter of 2015, the Company made announcements regarding the Company’s earnings and noncompliance with one of our Prior Credit Facility covenants. On January 27, 2015, the Company announced its preliminary fourth quarter and full year 2014 results and that the Company was not in compliance with the Prior Credit Facility’s tangible net worth covenant. On March 16, 2015, the Company announced actual fourth quarter and full year 2014 results and that a waiver of the covenant breach had been obtained. As a result of these announcements, the Company’s stock price fluctuated greatly during the first quarter of 2015, dropping from a January 2nd price of $6.41 to a March 31st price of $4.52.

Due to the decrease in the stock price that resulted and our first quarter loss, the Company noted that a goodwill impairment triggering event occurred during the first quarter of 2015. Therefore, we updated our fourth quarter goodwill impairment assessment using the two methods discussed in Note 8 of the Notes to Consolidated Financial Statements in the 2014 Form 10-K. The assessment used updated first quarter information which incorporated the Company’s stock price at March 31, 2015 and reduced gross margins used in our discounted cash flow model projections. Based on this revised testing, there was no goodwill impairment and we determined that the fair value of the Company’s equity was approximately 8% above the carrying value of the Company’s equity.

During the third quarter of 2015, the Company noted that the revenue projections used in our first quarter goodwill impairment assessment were higher than our actual results for the second and third quarters of 2015; therefore, the Company determined that a goodwill impairment triggering event occurred during the third quarter of 2015. As such, we updated our first quarter goodwill impairment assessment with third quarter 2015 information which incorporated the Company’s stock price at September 30, 2015 and reduced the projected revenue used in our discounted cash flow model. The forecasted cash flows took into consideration historical and recent results, backlog and near term projects, recent developments, strategic actions and management’s outlook for the future. The forecast and growth assumptions included, among other things, improved project performance, continuation of a strong base market, and margin improvements driven by incremental margin product opportunities and pursuing work in adjacent markets. Based on this revised testing, there was no goodwill impairment and we passed by an improved margin compared to that of our first quarter’s 2015 assessment margin.

Our third quarter goodwill impairment assessment’s concluded fair value could be negatively impacted if actual future performance falls short of the collective cash flow model assumptions or if our stock price is adversely affected. If based on future assessments, our goodwill is deemed to be impaired; the impairment would result in a charge to earnings which could be material.

### Historical Cash Flows

The following tables set forth information about our cash flows and liquidity (amounts in thousands):

| Net cash provided by (used in): | Nine Months Ended September 30, 2015 | 2014 |
| --- | ---: | ---: |
| Operating activities | $3,492 | $(17,298) |
| Capital expenditures | (7,086) | (11,224) |
| Proceeds from sales of property and equipment | 5,859 | 4,874 |
| Net (repayment) drawdown on the Credit Facility | (34,602) | 26,335 |
| Equipment-based Facility | 32,080 | – |
| Restricted cash | (4,945) | – |
| Distributions to noncontrolling interest owners | (3,402) | (1,190) |
| Net proceeds from stock issued | – | 14,078 |
| Other | (2,751) | (447) |
| Total | $(11,355) | $15,128 |

|  | Amount as of September 30, 2015 | December 31, 2014 |
| --- | ---: | ---: |
| Cash and cash equivalents | $11,488 | $22,843 |
| Working capital | $41,562 | $52,324 |

#### Operating Activities

Significant non-cash items included in operating activities include depreciation and amortization expense which was $12.5 million and $13.8 million in the Current Period and Prior Period, respectively. Depreciation expense has decreased from the Prior Period to the Current Period as a result of our efforts to maintain our current fleet of equipment and supplement it as necessary with leased equipment.

Besides the net loss and net income in the Current Period and Prior Period, respectively, and the non-cash items discussed above, other significant components of cash flows from operations were:

- contracts receivable increased by $20.8 million in the Current Period and increased $28.1 million in the Prior Period while the net cash effect of billings in excess of costs and estimated earnings, and costs and estimated earnings in excess of billings increased cash by $17.5 million in the Current Period and decreased cash by $23.1 million in the Prior Period;
- other assets decreased $12.8 million in the Current Period and $1.8 million in the Prior Period; the decrease in the Current Period is primarily due to the sale of our long-term contract receivable;
- accounts payable decreased by $7.3 million in the Current Period and increased $19.5 million in the Prior Period; and
- member’s interest subject to mandatory redemption and undistributed earnings decreased by $1.1 million in the Current Period and increased by $1.2 million in the Prior Period as a result of undistributed earnings (losses).

#### Investing Activities

Capital equipment is acquired as needed to support increased levels of production activities and to replace retiring equipment. Expenditures for the replacement of certain equipment and to expand our construction fleet of equipment for the Current Period and Prior Period totaled $7.1 million and $11.2 million, respectively. Proceeds from the sale of property and equipment for the Current Period and Prior Period totaled $5.9 million and $4.9 million, respectively, with associated net gains for the Current Period and Prior Period of $1.2 million and $0.9 million, respectively. Included in the proceeds and net gains was $2.4 million and $1.4 million, respectively, for the sale of a parcel of land located in Harris County, Texas. The level of expenditures in the Current Period decreased by $4.1 million from the Prior Period as a result of management’s efforts to optimize utilization of our existing fleet of equipment based on current and projected workloads while supplementing our fleet with leased and financed equipment as needed.

#### Financing Activities

Financing activities in the Current Period consisted of the net repayments on our Prior Credit Facility of $34.6 million and cumulative drawdowns on our equipment-based revolver of $13.1 million and cash received from our equipment-based term loan of $19.0 million, both of which were used to fund our operating activities and replace our Prior Credit Facility. During the Current Period, a distribution of $3.4 million was approved to a noncontrolling interest member. In the Prior Period, we received $14.1 million from our common stock offering which was used to strengthen our balance sheet. In addition, there was a net drawdown of $26.3 million on our Prior Credit Facility which was primarily used to fund our operating activities. During the Prior Period, a distribution of $1.2 million was approved to a noncontrolling interest member.

### Liquidity and Sources of Capital

The level of working capital for our construction business varies due to fluctuations in:

- contract receivables and contract retentions;
- costs and estimated earnings in excess of billings;
- billings in excess of costs and estimated earnings;
- the size and status of contract mobilization payments and progress billings; and
- the amounts owed to suppliers and subcontractors.

Some of these fluctuations can be significant.

At September 30, 2015, we had working capital of $41.6 million, a decrease of $10.8 million from December 31, 2014. The decrease in working capital was the result of the following (amounts in thousands):

|  |  |
| --- | ---: |
| Net loss | $(16,330) |
| Depreciation and amortization | 12,479 |
| Capital expenditures | (7,086) |
| Proceeds from sales of property and equipment, net of gain | 4,654 |
| Restricted cash | (4,945) |
| Current portion of long-term debt – equipment-based term loan | (4,085) |
| Distributions to noncontrolling interest owners | (3,402) |
| Net repayment on the Prior Credit Facility | (34,602) |
| Borrowings under Equipment-based Facility | 32,080 |
| Prepaid expenses and other assets | 12,780 |
| Other | (2,305) |
| Total decrease in working capital | $(10,762) |

In addition to our available cash and cash equivalents and cash provided by operations, from time to time we use borrowings under our available credit or equipment-based facilities to finance our capital expenditures and working capital needs.

On May 29, 2015, the Company and its wholly-owned subsidiaries entered into a $40.0 million loan and security agreement with Nations, consisting of a $20.0 million Term Loan and a $20.0 million Revolving Loan (combined, the “Equipment-based Facility”), which replaced the Company’s Prior Credit Facility with Comerica. The amount of the Revolving Loan that may be borrowed from time to time is determined quarterly and may not exceed $20.0 million. In addition, the sum of the outstanding balances of the Equipment-based Facility may not exceed the lesser of $40.0 million or 65% of the appraised value of the collateral pledged for the loans. At September 30, 2015, the Company had approximately $34.3 million of borrowing base which was the result of calculating 65% of the appraised value (where appraised value equals net operating liquidated value) of the Company’s collateral. The Revolving Loan may be utilized by us to provide ongoing working capital and for other general corporate purposes. At September 30, 2015, we had the $19.0 million outstanding on the Term Loan, $13.1 million drawn on the Revolving Loan, and $2.2 million of borrowings available.

The Equipment-based Facility bears interest at an initial fixed annual rate of 12%, which is subject to (i) a decrease of up to two percentage points based on the Company's fixed charge coverage ratio for each of the most recently ended four quarters beginning with the four quarters ended June 30, 2016; and (ii) an increase of two percentage points beginning December 31, 2015 based on the fixed charge coverage ratio at the end of the following two quarters. Principal on the Term Loan is payable in 47 monthly installments (with accrued interest) with a final payment of the then outstanding principal amount on May 29, 2019. Up to $5.0 million of the Term Loan may be prepaid in any year, but subject to a pre-payment fee that declines as the Term Loan nears maturity. Outstanding Revolving Loans are payable in full thirty days before the maturity date of the Term Loan.

The Equipment-based Facility is secured by all of the Company's personal property except accounts receivable, including all of its construction equipment, which forms the basis of availability under the Revolving Loan. The Equipment-based Facility is also secured by one-half of the equipment of the Company's 50%-owned affiliates, Road and Highway Builders, LLC and Myers & Sons Construction, L.P. pursuant to a separate security agreement with those entities. If a default occurs, Nations may exercise the Company's rights in the collateral, with all of the rights of a secured party under the Uniform Commercial Code, including, among other things, the right to sell the collateral at public or private sale.

The proceeds of the Term Loan of $20.0 million and our initial draw of $14.6 million under the Revolving Loan were utilized by the Company to repay the balance outstanding and terminate the Prior Credit Facility and for other general corporate purposes. In addition, in connection with incurring this debt, we recorded $1.3 million in deferred debt issuance costs which are included in “Other assets, net” in our condensed consolidated balance sheet, which is being amortized over the term of the Equipment-based Facility. In order to extinguish the Prior Credit Facility debt, the Company incurred costs of $0.2 million which is included in the Company’s condensed consolidated statement of operations.

The Company’s Equipment-based Facility has no financial covenants; however, it contains restrictions on the Company’s ability to:

- Incur liens and encumbrances;
- Incur further indebtedness;
- Dispose of a material portion of assets or merge with a third party;
- Make acquisitions; and
- Make investments in securities.

Due to this new Equipment-based Facility agreement, the Company’s Letter of Credit, which under our Prior Credit Facility reduced the Company’s borrowing availability, is now collateralized with cash.

Average combined borrowings under the Equipment-based Facility for the Current Quarter were $33.4 million and the largest amount of borrowings was under the Equipment-based Facility of $34.2 million from July 1, 2015 through July 31, 2015. Average borrowings under the Prior Credit Facility for the Prior Quarter were $11.4 million, and the largest amount of borrowings under the Prior Credit Facility was $36.8 million on April 21, 2014.

Interest expense was $1.1 million and $2.1 million in the Current Quarter and Current Period, respectively, compared to $0.2 million and $0.8 million in the Prior Quarter and Prior Period, respectively. This increase in interest expense in the Current Quarter and Current Period was driven by the increased interest rate on the new Equipment-based Facility agreement, as described above.

Based on our average borrowings and cash on hand during the Current Period and our forecasted cash needs for the remainder of the year, we believe that we have sufficient liquid financial resources to fund our requirements for the next twelve months of operations, including our bonding requirements. However, in the event of a substantial cash constraint and were unable to secure adequate debt financing, or we continue to incur losses, our working capital could be materially and adversely affected. Refer to “Item 1A. Risk Factors” in the 2014 Form 10-K for further discussion of liquidity related risks.

The Company is continually assessing ways to increase revenues and reduce costs to improve liquidity. During the third quarter of 2015, we scrutinized our fleet of equipment in order to identify underutilized and non-core assets. We identified $3.8 million of underutilized and non-core assets that we intend to sell within the next twelve months. We expect to use the proceeds from the sale of these assets to reduce a portion of our debt and for other working capital needs.

### Inflation

Inflation generally has not had a material impact on our financial results; however, from time to time, increases in oil, fuel and steel prices have affected our cost of operations. Anticipated cost increases and reductions are considered in our bids to customers on proposed new construction projects.

In order to mitigate our exposure to increases in fuel prices, we historically engaged in a program to hedge our exposure to increases in diesel fuel prices by entering into swap contracts for diesel fuel. Due to the decline in oil and fuel prices, we have not entered into any new derivative instruments in 2015. In addition, we retired this program when our last swap contract was settled in August 2015.

Where we are the successful bidder on a project, we execute purchase orders with material suppliers and contracts with subcontractors covering the prices of most materials and services, other than oil and fuel products, thereby mitigating future price increases and supply disruptions. These purchase orders and subcontracts do not contain quantity guarantees, and we have no obligation to the suppliers or subcontractors for materials and services beyond those required to complete the contracts with our customers. There can be no assurance that increases in prices of oil and fuel used in our business will be adequately covered by the estimated escalation we have included in our bids and there can be no assurance that all of our vendors will fulfill their pricing and supply commitments under their purchase orders and contracts with the Company. We adjust our total estimated costs on our projects when we believe it is probable that we will have cost increases which will not be recovered from customers, vendors or through project re-engineering.

### Off-Balance Sheet Arrangements and Joint Ventures

As discussed further in “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operation−Off-Balance Sheet Arrangements and Joint Ventures” in the 2014 Form 10-K, we participate in various construction joint venture partnerships in order to share expertise, risk and resources for certain highly complex projects. The venture’s contract with the project owner typically requires joint and several liability among the joint venture partners. Although our agreements with our joint venture partners provide that each party will assume and fund its share of any losses resulting from a project, if one of our partners is unable to pay its share, we would be fully liable for such share under our contract with the project owner. Circumstances that could lead to a loss under these guarantee arrangements include a partner’s inability to contribute additional funds to the venture in the event that the project incurs a loss or additional costs that we could incur should the partner fail to provide the services and resources toward project completion that had been committed to in the joint venture agreement.

At September 30, 2015, there was approximately $35 million of construction work to be completed on unconsolidated construction joint venture contracts, of which $11 million represented our proportionate share. Due to the joint and several liability under our joint venture arrangements, if one of our joint venture partners fails to perform, we and the remaining joint venture partners would be responsible for completion of the outstanding work. As of September 30, 2015, we are not aware of any situation that would require us to fulfill responsibilities of our joint venture partners pursuant to the joint and several liability provisions under our contracts.

Off-balance sheet arrangements related to operating leases are discussed in “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations –Liquidity and Sources of Capital− Contractual Obligations” in the 2014 Form 10-K.

## Market risk

As filed, 1,536 characters.

Changes in interest rates are one of our sources of market risks. Outstanding indebtedness under our Prior Credit Facility incurred interest at floating rates. There were no borrowings under this facility during the Current Quarter. As the new Equipment-based Facility does not bear interest at floating rates, we are not subject to an impact on our results from operations from a change interest rate. However, our interest rate could increase by 2% based on our fixed charge coverage ratio as noted above in Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations – Liquidity and Sources of Capital.

We are exposed to market risk from changes in commodity prices. In the normal course of business, we historically entered into derivative transactions, specifically cash flow hedges, to mitigate our exposure to diesel fuel commodity price movements. We did not participate in these transactions for trading or speculative purposes. While the use of these arrangements may have limited the benefit to us of decreases in the prices of diesel fuel, it also limited the risk of adverse price movements. Due to the recent decline in oil and fuel prices, we have not entered into any new derivative instruments and we retired our hedging program when our last swap contract was settled in August 2015. As such, there are no outstanding contracts at September 30, 2015:

See “Inflation” above regarding risks associated with materials and fuel purchases required to complete our construction contracts.

## Controls and procedures

As filed, 5,852 characters.

### Evaluation of Disclosure Controls and Procedures

Disclosure controls and procedures include, but are not limited to, controls and procedures designed to ensure that information required to be disclosed by an issuer in the reports that it files or submits under the Securities Exchange Act of 1934 is accumulated and communicated to the issuer’s management, including the principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

The Company’s principal executive officer and principal financial officer reviewed and evaluated the Company’s disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934). Due to the material weakness in internal control described in the Company’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2015, and the material weakness identified during our preparation of the third quarter 2015 financial statements as described below, the Company’s principal executive officer and principal financial officer concluded that the Company’s disclosure controls and procedures were not effective at September 30, 2015 to ensure that the information required to be disclosed by the Company in this Report is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission’s rules and forms and is accumulated and communicated to the Company's management including the principal executive and principal financial officers, as appropriate to allow timely decisions regarding required disclosure.

### Reported Material Weakness

As of September 30, 2015, management identified a material weakness in internal controls over financial reporting. Specifically, the Company did not adequately review and challenge the inputs to their valuation model, including giving sufficient consideration to current experience which differed from historical assumptions. This control deficiency could have resulted in a material adjustment to goodwill and related disclosures in the condensed consolidated financial statements for the quarter ended September 30, 2015. Unless remediated, this control deficiency could result in a material misstatement of the Company’s condensed consolidated financial statements that would not be prevented or detected.

In response to the material weakness identified above, management completed the following action plan prior to filing the September 30, 2015 Form 10-Q:

- Formed a new team which included and received input from the Company’s senior operational and financial management, and its outside advisors including the Company’s recently announced new Chief Financial Officer to review and challenge the various inputs to the revised valuation model. These inputs included, among other things, historical actual results versus forecasted data, recent performance, backlog, and near term projects, recent developments, strategic actions and management’s outlook for the future. The forecast and growth assumptions included, among other things, improved project performance, continuation of a strong base market, and margin improvements driven by incremental margin product opportunities and pursuing work in adjacent markets.

The Company’s management believes that this additional and enhanced procedure and internal control is appropriate. Additionally, this additional action and control will be included as an integral component of the company’s future periodic impairment analysis.

### Previously Reported Material Weakness

In connection with preparing its financial statements for the quarter ended March 31, 2015, management identified a material weakness in internal control over financial reporting as it relates to the operation of our processes and controls to review the status of our construction projects (i.e., work-in-progress review) in terms of both job costs and revenues at our Texas subsidiary.

In order to remediate the material weakness in internal control over financial reporting, we continue to execute a plan which includes, among other things, the following actions:

- Personnel changes at our Texas subsidiary are being made to ensure an adequate number of competent project managers are on staff to increase the precision of monthly project reviews.
- New procedures are being put in place to provide a more detailed evaluation of the work-in-progress report for all on-going projects.

These remediation plans are being administered by the Chief Financial Officer and involves key leaders from across the organization. As we continue to evaluate and work to enhance internal control over financial reporting, we may determine that additional measures should be taken to address these or other control deficiencies, and/or that we should modify the remediation plan described above.

### Changes in Internal Control over Financial Reporting

Other than the description of the material weaknesses in internal control over financial reporting and our efforts to remediate such material weaknesses described above, there have been no changes in our internal control over financial reporting (as defined in Rule 13a-15(f) under the Exchange Act) during the fiscal quarter ended September 30, 2015 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

### Inherent Limitations on Effectiveness of Controls

Internal control over financial reporting may not prevent or detect all errors and all fraud. Also, projections of any evaluation of effectiveness of internal control to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

## Risk factors

As filed, 270 characters.

There have not been any material changes from the risk factors previously disclosed in Part I, Item 1A Risk Factors of the 2014 Form 10-K. You should carefully consider such risk factors, which could materially affect our business, financial condition or future results.

Filed Nov 9, 2015.
Source: SEC EDGAR, the filing index for accession 0001171843-15-006116. Last ingested by Listed: Nov 5, 2026, 14:02 ET. No prices; not investment advice.