# Sterling Infrastructure, Inc.: Form 10-Q for the period ended Mar 31, 2017

- Company: [Sterling Infrastructure, Inc.](/companies/strl.md) (CIK 874238)
- Form: 10-Q
- Filed: 2017-05-03
- Accepted by EDGAR: May 3, 2017, 09:06 ET
- Period: 2017-03-31
- Accession: 0001171843-17-002553
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/874238/000117184317002553/f10q_050317p.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/874238/000117184317002553/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2017-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Cost of revenue | 3 months, 2017-01-01 to 2017-03-31 | $144.1m | us-gaap:CostOfGoodsSold |
| Gross profit | 3 months, 2017-01-01 to 2017-03-31 | $9.3m | us-gaap:GrossProfit |
| Operating income | 3 months, 2017-01-01 to 2017-03-31 | −$1.8m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2017-01-01 to 2017-03-31 | $27.0k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2017-01-01 to 2017-03-31 | −$1.9m | us-gaap:ProfitLoss |
| Diluted shares (weighted) | 3 months, 2017-01-01 to 2017-03-31 | 25,022,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Capital expenditure | 3 months, 2017-01-01 to 2017-03-31 | $1.8m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2017-03-31 | $37.1m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2017-03-31 | $181.0m | us-gaap:AssetsCurrent |
| Total assets | at 2017-03-31 | $304.6m | us-gaap:Assets |
| Current liabilities | at 2017-03-31 | $151.8m | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2017-03-31 | $1.4m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2017-03-31 | $2.9m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2017-03-31 | $105.8m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 35,136 characters.

### Cautionary Comment Regarding Forward-Looking Statements

This Report includes statements that are, or may be considered to be, “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, or the Securities Act and Section 21E of the Securities Exchange Act of 1934, as amended, or the Exchange Act. These forward-looking statements are included throughout this Report, including in this section, “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” and relate to matters such as our industry, business strategy, goals and expectations concerning our market position, future operations, margins, profitability, capital expenditures, liquidity and capital resources and other financial and operating information. We have used the words “anticipate,” “assume,” “believe,” “budget,” “continue,” “could,” “estimate,” “expect,” “forecast,” “future,” “intend,” “may,” “plan,” “potential,” “predict,” “project,” “should,” “will,” “would” and similar terms and phrases to identify forward-looking statements in this Report.

Forward-looking statements reflect our current expectations as of the date of this Report regarding future events, results or outcomes. These expectations may or may not be realized. Some of these expectations may be based upon assumptions or judgments that prove to be incorrect. In addition, our business and operations involve numerous risks and uncertainties, many of which are beyond our control, that could result in our expectations not being realized or otherwise could materially affect our financial condition, results of operations and cash flows.

Actual events, results and outcomes may differ materially from our expectations due to a variety of factors. Although it is not possible to identify all of these factors, they include, among others, the following:

- changes in general economic conditions, including recessions, reductions in federal, state and local government funding for infrastructure services and changes in those governments’ budgets, practices, laws and regulations;
- delays or difficulties related to the completion of our projects, including additional costs, reductions in revenues or the payment of liquidated damages, or delays or difficulties related to obtaining required governmental permits and approvals;
- actions of suppliers, subcontractors, design engineers, joint venture partners, customers, competitors, banks, surety companies and others which are beyond our control, including suppliers’, subcontractors’ and joint venture partners’ failure to perform;
- factors that affect the accuracy of estimates inherent in our bidding for contracts, estimates of backlog, percentage-of-completion accounting policies, including onsite conditions that differ materially from those assumed in our original bid, contract modifications, mechanical problems with our machinery or equipment and effects of other risks discussed in this document;
- design/build contracts which subject us to the risk of design errors and omissions;
- cost escalations associated with our contracts, including changes in availability, proximity and cost of materials such as steel, cement, concrete, aggregates, oil, fuel and other construction materials and cost escalations associated with subcontractors and labor;
- our dependence on a limited number of significant customers;
- adverse weather conditions; although we prepare our budgets and bid contracts based on historical rain and snowfall patterns, the incidence of rain, snow, hurricanes, etc., may differ materially from these expectations;
- the presence of competitors with greater financial resources or lower margin requirements than ours and the impact of competitive bidders on our ability to obtain new backlog at reasonable margins acceptable to us;
- our ability to successfully identify, finance, complete and integrate acquisitions;
- citations issued by any governmental authority, including the Occupational Safety and Health Administration;
- federal, state and local environmental laws and regulations where non-compliance can result in penalties and/or termination of contracts as well as civil and criminal liability;
- adverse economic conditions in our markets; and
- the other factors discussed in more detail in our Annual Report on Form 10-K for the year ended December 31, 2016 (“2016 Form 10-K”) under “Item 1A. — Risk Factors.”

In reading this Report, you should consider these factors carefully in evaluating any forward-looking statements and you are cautioned not to place undue reliance on any forward-looking statements. Although we believe that our plans, intentions and expectations reflected in, or suggested by, the forward-looking statements that we make in this Report are reasonable, we can provide no assurance that they will be achieved.

*The forward-looking statements included in this Report are made only as of the date of this Report and we undertake no obligation to update any information contained in this Report or to publicly release the results of any revisions to any forward-looking statements to reflect events or circumstances that occur, or that we become aware of after the date of this Report, except as may be required by applicable securities laws.*

### Overview

Sterling Construction Company, Inc. (“Sterling” or “the Company”), is a leading heavy civil construction company that specializes in building and reconstruction of transportation infrastructure, water infrastructure, and residential and commercial concrete projects in Texas, Utah, Nevada, Colorado, Arizona, California, Hawaii, and other states where there are construction opportunities. Its transportation infrastructure projects include highways, roads, bridges, airfields, ports and light rail. Its water infrastructure projects include water, wastewater and storm drainage systems. Its residential and commercial concrete projects include concrete foundations for single-family and multi-family homes, commercial projects and parking structures.

Although we describe our business in this Report in terms of the services we provide, our base of customers and the geographic areas in which we operate, we have concluded that through March 31, 2017, our operations consisted of one reportable segment, one operating segment and one reporting unit component: heavy civil construction. In making this determination, the Company considered the discrete financial information used by our Chief Operating Decision Maker (“CODM”). Based on this approach, the Company noted that the CODM organizes, evaluates and manages the financial information around each heavy civil construction project when making operating decisions and assessing the Company’s overall performance. Furthermore, we considered that each heavy civil construction project has similar characteristics, includes similar services, has similar types of customers and is subject to similar economic and regulatory environments.

On April 3, 2017, the Company consummated the acquisition of 100% of the outstanding stock of Tealstone Residential Concrete, Inc. and Tealstone Commercial, Inc. (collectively, “*Tealstone”*) and entered into a Loan and Security Agreement providing for a term loan of $85,000,000 with a maturity date of April 4, 2022, which replaced the then existing debt facility. The Company is reviewing the impact which the acquisition will have on its segment reporting beginning with the quarter ending June 30, 2017. Preliminarily, the Company believes that the residential concrete portion of Tealstone will be an additional reportable segment. Refer to Note 12 regarding subsequent events for additional information.

### Market Outlook and Trends

Market outlook: Our core business, through March 31, 2017, was primarily driven by Federal and state funding. The 2015 passage of the federally funded five-year $305 billion surface transportation bill will increase the annual federal highway investment by 15.1% over the five-year period from 2016 to 2020. In addition to the Federal program, several of the states in our key markets have instituted actions to further increase annual spending. In Texas, two constitutional amendments were passed, which will increase the annual funds allocated to transportation projects by $4.0 billion to $4.5 billion per year. In Utah, a 20% gas tax increase was put into effect January 1, 2016, which is the first state gas tax increase there in 18 years. In addition, a 1-cent sales tax increase was approved in Los Angeles, California in 2016 which will provide $3 billion a year for local road, bridge and transit projects. See “Item 1. Business—Our Markets, Competition and Customers” in our 2016 Form 10-K for a more detailed discussion of our markets and their funding sources.

Bid discipline and project execution: To ensure that we take full advantage of the improved market conditions and maximize profitability, we have completed an extensive evaluation of our projects’ historical success based on project size, end customer, product delivered and geography. The knowledge gained has now been incorporated into a more formal and rigorous bid evaluation and approval process, which along with the institution of common processes, we believe will enable us to focus our resources on the most beneficial projects and significantly reduce our risk. In addition, in order to strengthen these processes and capitalize further on the improved market conditions, we appointed a Chief Operating Officer in the first quarter of 2016.

Backlog, expected backlog gross margin trends:

*(Dollar amounts in thousands)*

|  | Backlog | Gross Margin in Backlog |
| --- | ---: | ---: |
| First quarter of 2017 | $925,000 | 8.4% |
| Fourth quarter of 2016 | $823,000 | 8.2% |
| Third quarter of 2016 | $820,000 | 8.0% |
| Second quarter of 2016 | $810,000 | 7.8% |
| First quarter of 2016 | $854,000 | 7.7% |

20

Our gross margin in backlog has increased approximately 70 basis points, from 7.7% at March 31, 2016 to 8.4% at March 31, 2017. The increases noted above are primarily the result of the improving market conditions and actions that we have taken to improve bid discipline and the completion of legacy low margin projects.

For purposes of the discussions which follow, “Current Quarter” refers to the three-month period ended March 31, 2017 and “Prior Quarter” refers to the three-month period ended March 31, 2016.

### Summary of Financial Results for the Current Quarter

In the Current Quarter, we had an operating loss of $1.8 million, loss before income taxes and earnings attributable to noncontrolling interest owners of $1.9 million, loss attributable to Sterling common stockholders of $2.3 million and net loss per diluted share attributable to Sterling common stockholders of $0.09.

### Results of Operations

#### Backlog at March 31, 2017

At March 31, 2017, our backlog of construction projects was $925 million, as compared to $823 million at December 31, 2016. Our heavy civil construction contracts are typically completed in 12 to 36 months. At March 31, 2017 and December 31, 2016, approximately $55 million and $226 million, respectively, was excluded from our consolidated backlog for projects in which we were the apparent low bidder, but had not yet been formally awarded the contract or the contract price had not been finalized (“Unsigned Low-bid Awards”). Total backlog, including Unsigned Low-bid Awards, at March 31, 2017 and December 31, 2016, was $980 million and $1,049 million, respectively. Backlog includes $47 million and $53 million at March 31, 2017 and December 31, 2016, respectively, attributable to our share of estimated revenues related to joint ventures where we are a noncontrolling joint venture partner.

#### Results of Operations for the Current Quarter as compared to the Prior Quarter

*(dollar amounts in thousands)*

|  | Three Months Ended March 31, 2017 | 2016 | % Change |
| --- | ---: | ---: | ---: |
| Revenues | $153,416 | $126,567 | 21.2% |
| Gross profit | $9,287 | $3,548 | NM |
| General and administrative expenses | (10,604) | (10,085) | 5.1 |
| Other operating (expense) income, net | (471) | 71 | NM |
| Operating loss | (1,788) | (6,466) | (72.3) |
| Interest income | 41 | 3 | NM |
| Interest expense | (112) | (873) | (87.2) |
| Loss before taxes and earnings attributable to noncontrolling interests | (1,859) | (7,336) | (74.7) |
| Income tax expense | (27) | -- | NM |
| Net loss | (1,886) | (7,336) | (74.3) |
| Noncontrolling owners’ interests in earnings of subsidiaries and joint ventures | (371) | 8 | NM |
| Net loss attributable to Sterling common stockholders | $(2,257) | $(7,328) | (69.2) |
| Gross margin | 6.1% | 2.8% | NM |
| Operating margin (deficit) | (1.2)% | (5.1)% | (76.5) |

#### NM – Not meaningful.

|  | Amount as of March 31, 2017 | December 31, 2016 |
| --- | ---: | ---: |
| Contract Backlog, end of period | $925,000 | $823,000 |

#### Revenues

Revenues increased $26.8 million, or 21.2%, in the Current Quarter compared with the Prior Quarter. As our markets continue to improve, so has the trend of increasing backlog which increased $62 million from December 31, 2015 to $823 million at December 31, 2016 and increased an additional $102 million from December 31, 2016 to March 31, 2017. This trend has contributed to the increased execution of projects and has favorably affected revenues in the first quarter of 2017. Specifically, the $26.8 million increase is attributable to a total increase of approximately $31 million primarily due to the ramp up of large Utah projects constructed by our majority-owned joint ventures and construction on large projects in Texas as well as in Utah. The Texas increase was also aided by improved weather conditions during the Current Quarter. This increase was offset by approximately $4 million of decreased project activity primarily in California due to the winding down of a large project in California.

#### Gross profit

Gross profit increased $5.7 million for the Current Quarter compared with the Prior Quarter. Gross margins increased to 6.1% from 2.8% in the Prior Quarter. The increase in gross margin during the Current Quarter as compared to the Prior Quarter was primarily a result of improved project execution and higher backlog margins which have positively affected profitability in the first quarter of 2017.

The first quarter of our fiscal year incurs the greatest declines related to seasonality in both revenues and gross profit. Seasonality declines related to revenues are the result of heavy winter weather which in some cases results in work ceasing in the winter months, hinders productivity, or causes delays, on our projects in progress mainly in the northern or mountainous parts of our markets. Seasonality declines related to gross profits are the result of under-absorbed overhead due to the lower revenue volumes. Overhead rates are set for equipment usage hours and labor hours performed on projects based on expected total hours of equipment usage or expected total hours of work to be performed for the full year. In a period with low volume, the under-absorbed overhead amounts have an unfavorable effect on gross profit. Typically, a portion of this first quarter under-absorbed overhead is recovered in subsequent quarters when the activity levels are higher. During the Current Quarter, under-absorbed overhead, which we believe will be recovered by higher levels of activity for the balance of the year, was approximately $1.5 million.

At March 31, 2017 and 2016, we had approximately 126 and 121 contracts-in-progress, respectively, which were less than 90% complete. These contracts are of various sizes, of different expected profitability and in various stages of completion. The nearer a contract progresses toward completion, the more we are able to refine our estimate of total revenues (including incentives, delay penalties and change orders), costs and gross profit. Thus, gross profit as a percent of revenues can increase or decrease from comparable and subsequent quarters due to variations among contracts and depending upon the stage of completion of contracts.

#### General and administrative expenses

General and administrative expenses increased $0.5 million to $10.6 million during the Current Quarter from $10.1 million in the Prior Quarter. The increase in the Current Quarter as compared to the Prior Quarter is primarily the result of higher salary and wage costs due to increased hiring to perform work on a greater number of projects in the Current Quarter.

As a percent of revenues, general and administrative expenses decreased 1.1% to 6.9% in the Current Quarter compared with 8.0% in the Prior Quarter. The decrease in general and administrative expenses, as a percentage of revenue, for the Current Quarter is primarily the result of the leverage generated from generally fixed costs and increases in revenues.

#### Other operating income, net

Other operating income, net, includes 50% of earnings and losses related to members’ interests and other miscellaneous operating income or expense. Members’ interest earnings are treated as an expense while losses are treated as income, as earnings would increase the amount in our liability account “Members’ interest subject to mandatory redemption and undistributed earnings,” and losses would decrease this liability. The change in other operating (expense) income, net of $0.5 million was primarily due to consulting and legal costs of $0.3 million related to our acquisition of Tealstone.

### Liquidity and Sources of Capital

The following table sets forth information about our cash flows and liquidity (amounts in thousands):

| Net cash (used in) provided by: | Three Months Ended March 31, 2017 | 2016 |
| --- | ---: | ---: |
| Operating activities | $(3,062) | $490 |
| Investing activities | (1,237) | (1,753) |
| Financing activities | (1,339) | 11,756 |
| Total (decrease) increase in cash and cash equivalents | $(5,638) | $10,493 |

|  | March 31, 2017 | December 31, 2016 |
| --- | ---: | ---: |
| Cash and cash equivalents | $37,147 | $42,785 |
| Working capital | $29,189 | $29,316 |

23

#### Operating Activities.

During the Current Quarter, net cash used in operating activities was $3.1million compared to net cash provided of $0.5 million in the Prior Quarter. The drivers of operating activities cash flows were primarily the result of our net loss noted in our Results of Operations above, non-cash items, the change in our accounts receivable, inventory, net contracts in progress and accounts payable balances (collectively, “Contract Capital”) as discussed below.

The significant non-cash items reconciled to operating activities include depreciation and amortization expense, which were $4.1 million in the Current Quarter and $4.2 million in the Prior Quarter. Depreciation expense has decreased slightly from the Prior Quarter to the Current Quarter as a result of our efforts to maintain our current fleet of equipment and supplement it as necessary with more economical project specific leased equipment.

The need for working capital for our business varies due to fluctuations in operating activities and investments in our Contract Capital. The Components of Contract Capital at March 31, 2017 and March 31, 2016 and changes during the Current Quarter and Prior Quarter were as follows (amounts in thousands):

|  | Quarterly Changes in Components of Contract Capital for the Period Ended March 31, 2017 | March 31, 2016 | Variance |
| --- | ---: | ---: | ---: |
| Costs and estimated earnings in excess of billings on uncompleted contracts | $(1,770) | $(1,283) | $(487) |
| Billings in excess of costs and estimated earnings on uncompleted contracts | (1,444) | 8,527 | (9,971) |
| Contracts in progress, net | (3,214) | 7,244 | (10,458) |
| Contracts receivable, including retainage | (6,957) | (12,646) | 5,689 |
| Receivables from and equity in construction joint ventures | (760) | 4,614 | (5,374) |
| Inventories | (49) | (395) | 346 |
| Accounts payable | 4,351 | 4,429 | (78) |
| Contract Capital, net | $(6,629) | $3,246 | $(9,875) |

During the Current Quarter, Contract Capital decreased liquidity by $9.9 million. Fluctuations in our Contract Capital balance and its components are not unusual in our business and are impacted by the size of our projects and changing type and mix of projects in our backlog. Our Contract Capital is particularly impacted by the timing of new awards and related payments of performing work and the contract billings to the customer as we complete our projects. Contract Capital is also impacted at period-end by the timing of accounts receivable collections and accounts payable payments for our projects.

#### Investing Activities.

During the Current Quarter, net cash used in investing activities was $1.2 million compared to net cash used of $1.8 million in the Prior Quarter. The driver of investing activities cash flows were investments in capital equipment as discussed below.

Capital equipment is acquired as needed to support changing levels of production activities and to replace retiring equipment. Expenditures for the replacement of certain equipment and to expand our construction fleet totaled $1.8 million for the Current Quarter. Proceeds from the sale of property and equipment totaled $0.6 million for the Current Quarter with an associated net gain of $0.4 million. For the Prior Quarter, expenditures totaled $2.8 million, while proceeds from the sale of property and equipment totaled $1.1 million with an associated net gain of $0.2 million. The level of expenditures in the Current Quarter decreased by $1.0 million compared to the Prior Quarter. The decrease is a result of management’s efforts to optimize utilization of our existing fleet of equipment based on current and projected workloads while supplementing our fleet with leased and financed equipment as needed.

#### Financing Activities.

During the Current Quarter, net cash used in financing activities was $1.3 million compared to cash provided of $11.8 million in the Prior Quarter. The increase in cash used by financing activities was a result of typical scheduled principal payment for our Equipment-based Facility and notes payable, compared to a net drawdown of $13.1 million of our Revolving Loan in the Prior Quarter.

#### Cash and Working Capital.

Cash at March 31, 2017, was $37.1 million, which decreased based on the items mentioned above. Cash includes $1.5 million that was held by our VIE and $18.4 million belonging to our majority-owned joint ventures. Our working capital largely remained flat with a decrease of $0.1 million to $29.2 million at March 31, 2017 from $29.3 million at December 31, 2016.

#### Credit Facility, Other Sources of Capital and Acquisition

In addition to our available cash, cash equivalents and cash provided by operations, from time to time, we have used borrowings under our Equipment-based Facility to finance our capital expenditures and working capital needs.

At March 31, 2017, the Company had a borrowing base of $24.4 million, which was the result of calculating 65% of the appraised value (where appraised value equals net operating liquidated value) of the Company’s collateral. However, we had reached our revolver $20.0 million cap, and therefore only $20.0 million of borrowings were available at March 31, 2017. The Company had no amounts drawn on the revolving loan and $2.5 million of its term loan outstanding at March 31, 2017. Refer to Note 12 regarding the subsequent event related to our Equipment-based Facility.

Average borrowings under our Equipment-based Facility for the Current Quarter were $3.2 million and the largest amount of borrowings was $3.5 million in January 2017. Average borrowings under the Equipment-based Facility for the 2016 fiscal year were $18.1 million, and the largest amount of borrowings under the Equipment-based Facility was $31.6 million in January 2016.

Based on our average borrowings for 2016 and our 2017 forecasted cash needs, we continue to believe that the Company has sufficient liquid financial resources to fund our requirements for the next twelve months of operations, including our bonding requirements. Furthermore, the Company is continually assessing ways to increase revenues and reduce costs to improve liquidity. However, in the event of a substantial cash constraint and if we were unable to secure adequate debt financing, or we incurred losses, our working capital could be materially and adversely affected. Refer to “Item 1A. Risk Factors” in the 2016 Form 10-K for further discussion of liquidity related risks.

We will continue to explore additional capital alternatives to further strengthen our financial position in order to take advantage of this improving transportation infrastructure market. This could include the potential sale of assets, businesses or equity, the favorable resolution of outstanding contract claims, or a combination thereof. We expect to use proceeds from these initiatives to invest in projects meeting our gross margin, overall profitability and other requirements, as well as pursuing projects or investments in adjacent markets.

#### Purchase of Tealstone

On April 3, 2017, the Company consummated the acquisition of 100% of the outstanding stock of Tealstone Residential Concrete, Inc. and Tealstone Commercial, Inc. (collectively, “*Tealstone”*) from the stockholders thereof (the “Sellers”) for consideration consisting of $55,000,000 in cash (less debt outstanding on the closing date and costs incurred by the Sellers and Tealstone in connection with the transaction), 1,882,058 shares of the Company’s common stock (the “*Placement Shares”*), and $5,000,000 of promissory notes issued to the Sellers. In addition, the Company will make $2,500,000 and $7,500,000 of deferred cash payments on the second and third anniversaries of the closing date, respectively, and up to an aggregate of $15,000,000 in earn-out payments may be made on the first, second, third and fourth anniversaries of the closing date to continuing Tealstone management or their affiliates if specified financial performance levels are achieved. Tealstone focuses on concrete construction of residential foundations, parking structures, elevated slabs and other concrete work for leading homebuilders, multi-family developers and general contractors in both residential and commercial markets.

The preliminary acquisition-date fair value of the consideration transferred totaled $83.7 million, which consisted of the following:

Fair value of consideration transferred (amounts in thousands):

|  |  |
| --- | ---: |
| Cash | $55,000 |
| Common stock (1,882,058 shares) | 17,100 |
| Promissory notes | 4,400 |
| Deferred payments | 7,200 |
| Total | $83,700 |

The fair value of the 1,882,058 common shares issued was determined based on the average market price of the Company’s common shares on the acquisition date.

The promissory notes and deferred payments have been discounted using a preliminary 12% fair value discount rate. The earn-out arrangement requires the Company to pay up to an aggregate of $15,000,000 in earn-out payments on the first, second, third and fourth anniversaries of the closing date to continuing Tealstone management or their affiliates if specified financial performance levels are achieved. The Company’s preliminary analysis indicates that the compensation is tied to the continuing employment of certain key employees and executives of Tealstone and will be treated as additional compensation and not as additional contingent consideration.

The Company is in the process of estimating the fair values of the assets acquired and liabilities assumed at the acquisition date and obtaining third-party valuations of certain intangible assets. Additionally, the Company is in the process of compiling the pro forma financial information required.

#### Loan Agreement

On April 3, 2017, the Company, as borrower, and certain of its subsidiaries, as guarantors, entered into a Loan and Security Agreement with Wilmington Trust, National Association, as agent, and the lenders party thereto (the “*Loan Agreement”*), providing for a term loan of $85,000,000 (the “*Loan”*) with a maturity date of April 4, 2022, which replaced the then existing debt facility. The Loan is secured by substantially all of the assets of the Company and its subsidiaries.

Interest on the Loan is equal to the one-, two-, three- or six-month London interbank rate, or LIBOR, plus 8.75% per annum on the unpaid principal amount of the Loan, subject to adjustment under certain circumstances. Interest on the Loan is generally payable monthly. There are no amortized principal payments; however, the Company is required to prepay the Loan, and in certain cases pay a prepayment premium thereon, with proceeds received from the issuances of debt or equity, transfers, events of loss and extraordinary receipts. The Company is required to make an offer quarterly to the lenders to prepay the Loan in an amount equal to 75% of its excess cash flow, plus accrued and unpaid interest thereon and a prepayment premium.

The Loan Agreement contains various covenants that limit, among other things, the Company’s ability and certain of its subsidiaries’ ability to incur certain indebtedness, grant certain liens, merge or consolidate, sell assets, make certain loans, enter into acquisitions, incur capital expenditures, make investments, and pay dividends. In addition, the Company is required to maintain the following financial covenants:

- a ratio of secured indebtedness to EBITDA of not more than 3.10 to 1.00 beginning with the four consecutive quarters ending June 30, 2017, reducing to 1.80 to 1.00 by the four consecutive quarters ending September 30, 2019;
- daily cash collateral of not less than $10,000,000 commencing on June 30, 2017, increasing to $15,000,000 on October 1, 2017, and potentially further increasing to $18,000,000 beginning on April 4, 2018;
- a rolling four quarter gross margin in contract backlog of not less than $60,000,000 commencing June 30, 2017, increasing to $70,000,000 by March 31, 2019;
- the incurrence of net capital expenditures during each four consecutive fiscal quarters shall not exceed $15,000,000;
- bonding capacity shall be maintained at all times in an amount not less than $1,000,000,000; and
- the EBITDA of Tealstone Residential Concrete, Inc. shall not be less than $12,000,000 during each four consecutive fiscal quarters, commencing June 30, 2017.

The Loan Agreement also includes customary events of default, including events of default relating to non-payment of principal or interest, inaccuracy of representations and warranties, breaches of covenants, cross-defaults, bankruptcy and insolvency events, certain unsatisfied judgments, loan documents not being valid, calls under the Company’s bonds, failure of specified individuals to remain employed by the Company, and a change of control. If an event of default occurs, the lenders will be able to accelerate the maturity of the Loan Agreement and exercise other rights and remedies.

#### Warrants

On April 3, 2017, the Company issued Warrants (the “*Warrants”*) to the lenders under the Loan Agreement (the “*Holders”*) pursuant to which the Holders have the right to purchase, for a period of five years from the date of issuance, up to an aggregate of 1,000,000 shares of the Company’s common stock (the “*Warrant Shares”*) at an initial exercise price of $10.25 per share, subject to adjustment for stock splits, combinations and similar recapitalization events and weighted-average antidilution upon the issuance by the Company of shares of common stock or rights, options or convertible securities exercisable for common stock in the future at a price below the exercise price of the Warrants.

### Inflation

Inflation generally has not had a material impact on our financial results; however, from time to time, increases in oil, fuel and steel prices have affected our cost of operations. Anticipated cost increases and reductions are considered in our bids to customers on proposed new construction projects.

Where we are the successful bidder on a project, we execute purchase orders with material suppliers and contracts with subcontractors covering the prices of most materials and services, other than oil and fuel products, thereby mitigating future price increases and supply disruptions. These purchase orders and contracts do not contain quantity guarantees, and we have no obligation for materials and services beyond those required to complete the contracts with our customers. There can be no assurance that increases in prices of oil and fuel used in our business will be adequately covered by the estimated escalation we have included in our bids, and there can be no assurance that all of our vendors will fulfill their pricing and supply commitments under their purchase orders and contracts with the Company. We adjust our total estimated costs on our projects when we believe it is probable that we will have cost increases which will not be recovered from customers, vendors or re-engineering.

### Off-Balance Sheet Arrangements and Joint Ventures

We participate in various construction joint ventures in order to share expertise, risk and resources for certain highly complex projects. The venture’s contract with the project owner typically requires joint and several liability among the joint venture partners. Although our agreements with our joint venture partners provide that each party will assume and fund its share of any losses resulting from a project, if one of our partners is unable to pay its share, we would be fully liable for such share under our contract with the project owner. Circumstances that could lead to a loss under these guarantee arrangements include a partner’s inability to contribute additional funds to the venture in the event that the project incurs a loss or additional costs that we could incur should the partner fail to provide the services and resources toward project completion that had been committed to in the joint venture agreement.

At March 31, 2017, there was approximately $93 million of construction work to be completed on unconsolidated construction joint venture contracts, of which $47 million represented our proportionate share. Due to the joint and several liability under our joint venture arrangements, if one of our joint venture partners fails to perform, we and the remaining joint venture partners would be responsible for completion of the outstanding work. As of March 31, 2017, we are not aware of any situation that would require us to fulfill responsibilities of our joint venture partners pursuant to the joint and several liability provisions under our contracts.

Off-balance sheet arrangements related to operating leases are discussed in “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations –Liquidity and Sources of Capital− Contractual Obligations” in our 2016 Form 10-K.

## Market risk

As filed, 471 characters.

Changes in interest rates are one of our sources of market risks. Outstanding indebtedness under our Equipment-based Facility does not bear interest at floating rates, so our results from operations are not impacted from a change in interest rates. However, our interest rate could increase by 2% based on our fixed charge coverage ratio.

See “Inflation” above regarding risks associated with materials and fuel purchases required to complete our construction contracts.

## Controls and procedures

As filed, 2,186 characters.

### Evaluation of Disclosure Controls and Procedures

Disclosure controls and procedures include, but are not limited to, controls and procedures designed to ensure that information required to be disclosed by an issuer in the reports that it files or submits under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) is accumulated and communicated to the issuer’s management, including the principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

The Company’s principal executive officer and principal financial officer reviewed and evaluated the Company’s disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act). Based on that evaluation, the Company’s principal executive officer and principal financial officer concluded that the Company’s disclosure controls and procedures were effective at March 31, 2017 to ensure that the information required to be disclosed by the Company in this Report is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission’s rules and forms and is accumulated and communicated to the Company's management including the principal executive and principal financial officers, as appropriate to allow timely decisions regarding required disclosure.

### Changes in Internal Control over Financial Reporting

There have been no changes in our internal control over financial reporting (as defined in Rule 13a-15(f) under the Exchange Act) during the quarter ended March 31, 2017 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

### Inherent Limitations on Effectiveness of Controls

Internal control over financial reporting may not prevent or detect all errors and all fraud. Also, projections of any evaluation of effectiveness of internal control to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

## Risk factors

As filed, 1,330 characters.

***The homebuilding industry is cyclical which could affect our residential concrete projects, including foundations for single-family and multi-family homes. Deterioration in the homebuilding industry conditions or downward changes in general economic or other business conditions could materially adversely affect our results of operations.***

The residential homebuilding industry is sensitive to changes in economic conditions and other factors, such as the level of employment, consumer confidence, consumer income, availability of financing, and interest rate levels. Adverse changes in any of these conditions generally, or in the markets where we operate, could decrease demand and pricing for new homes in these areas or result in customer cancellations of pending contracts, which could adversely affect the number of concrete projects we construct or reduce the prices we can charge for these projects, either of which could result in a decrease in our revenues and earnings that could materially adversely affect our results of operations.

There have not been any material changes from the other risk factors previously disclosed in Part I, Item 1A Risk Factors of our 2016 Form 10-K. You should carefully consider such risk factors, which could materially affect our business, financial condition or future results.

Filed May 3, 2017.
Source: SEC EDGAR, the filing index for accession 0001171843-17-002553. Last ingested by Listed: Nov 5, 2026, 14:02 ET. No prices; not investment advice.