# Novagold Resources Inc: Form 10-K for the period ended Nov 30, 2024

- Company: [Novagold Resources Inc](/companies/ng.md) (CIK 1173420)
- Form: 10-K
- Filed: 2025-01-23
- Accepted by EDGAR: Jan 23, 2025, 08:01 ET
- Period: 2024-11-30
- Accession: 0001171843-25-000387
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1173420/000117184325000387/ng20241130_10k.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1173420/000117184325000387/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2024-11-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 12 months, 2023-12-01 to 2024-11-30 | $0 | us-gaap:Revenues |
| Operating income | 12 months, 2023-12-01 to 2024-11-30 | −$37.9m | us-gaap:OperatingIncomeLoss |
| Income tax | 12 months, 2023-12-01 to 2024-11-30 | $724.0k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 12 months, 2023-12-01 to 2024-11-30 | −$45.6m | us-gaap:NetIncomeLoss |
| Basic EPS | 12 months, 2023-12-01 to 2024-11-30 | −$0.14 | us-gaap:EarningsPerShareBasic |
| Operating cash flow | 12 months, 2023-12-01 to 2024-11-30 | −$12.6m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | at 2024-11-30 | $42.2m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2024-11-30 | $102.8m | us-gaap:AssetsCurrent |
| Total assets | at 2024-11-30 | $109.8m | us-gaap:Assets |
| Current liabilities | at 2024-11-30 | $4.5m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2024-11-30 | $157.2m | us-gaap:Liabilities |
| Shareholders' equity | at 2024-11-30 | −$47.4m | us-gaap:StockholdersEquity |

## Business

As filed, 15,642 characters.

### Overview

We operate in the gold mining industry, primarily focused on advancing the Donlin Gold project in Alaska. The Donlin Gold project is held by Donlin Gold LLC (“Donlin Gold”), a limited liability company owned equally by wholly-owned subsidiaries of NOVAGOLD and Barrick Gold Corporation (“Barrick”).

We do not produce gold or any other minerals, and do not currently generate operating earnings. Funding to explore our mineral properties and to operate the Company was acquired primarily through previous equity financings consisting of public offerings of our common shares and warrants and through debt financing consisting of convertible notes, and the sale of assets. We expect to continue to raise capital through additional equity and/or debt financings, through the exercise of stock options, and other such means.

We were incorporated by memorandum of association on December 5, 1984, under the Companies Act (Nova Scotia) as 1562756 Nova Scotia Limited. On January 14, 1985, we changed our name to NovaCan Mining Resources (1985) Limited and on March 20, 1987, we changed our name to NOVAGOLD RESOURCES INC. On May 29, 2013, our shareholders approved the continuance of the corporation into British Columbia. Subsequently, we filed the necessary documents in Nova Scotia and British Columbia, and we continued under the Business Corporations Act (British Columbia) effective as of June 10, 2013. The current addresses, telephone and facsimile numbers of our offices are:

| Executive office | Corporate office |
| --- | --- |
| 201 South Main Street, Suite 400 | 400 Burrard Street, Suite 1860 |
| Salt Lake City, UT, USA 84111 | Vancouver, BC, Canada V6C 3A6 |
| Telephone (801) 639-0511 | Toll free (866) 669-6227 |
| Facsimile (385) 342-4620 | Facsimile (604) 669-6272 |

8

### Corporate Structure

As of November 30, 2024, we had the following material, direct and indirect, wholly-owned subsidiaries: NOVAGOLD Resources Alaska, Inc., NOVAGOLD US Holdings Inc., NOVAGOLD USA, Inc., AGC Resources Inc, NOVAGOLD (Bermuda) Alaska Limited and NOVAGOLD Resources (Bermuda) Limited. On December 1, 2024, NOVAGOLD (Bermuda) Alaska Limited, NOVAGOLD Resources (Bermuda) Limited and NOVAGOLD Argentina Inc. were amalgamated with NOVAGOLD RESOURCES INC.

The following chart depicts the corporate structure of the Company together with the jurisdiction of incorporation of each of our material subsidiaries and related holding companies as of November 30, 2024. All ownership is 100% unless otherwise indicated.

### Human Capital Resources

On November 30, 2024, we had 14 full-time employees, of which four are located in Canada and ten are located in the United States. We also use consultants with specific skills to assist with various aspects of project evaluation, engineering, and corporate governance.

#### Company Values

Our company culture is the cornerstone of all our human capital programs. Empowering every employee to be their best, affording every employee the opportunity to make a difference, and giving every employee a chance to be heard are among the Company’s values. Our values extend to the communities in which we work. We have adopted a Human Rights Policy focused on our commitment to having a positive influence in the communities where we operate which includes ensuring that we respect human rights.

#### Diversity

As of the end of fiscal year 2024, 50% of our total workforce were women. Selection of individuals for executive and other positions with the Company is guided by the Company’s policy which “prohibits discrimination in any aspect of employment based on race, color, religion, sex, national origin, disability or age.” Our board of directors (the “Board”) and management acknowledge the importance of all aspects of diversity including gender, ethnic origin, business skills and experience, because it is right to do so and because it is good for our business. When considering candidates for executive positions, the Board’s evaluation considers the broadest possible assessment of each candidate’s skills and background with the overriding objective of ensuring that we have the appropriate balance of skills, experience, and capacity that the Company needs to be successful. In the context of this overriding objective, we have determined not to set targets for the percentage of women, or other aspects of diversity, in executive officer positions.

NOVAGOLD is committed to fostering, cultivating, and preserving a culture of diversity, equity and inclusion. Our employees are one of the most valuable assets we have. The collective sum of the individual differences, life experiences, knowledge, inventiveness, innovation, self-expression, unique capabilities, and talent that our employees invest in their work represents a significant part of our culture, reputation, and NOVAGOLD’s achievements.

NOVAGOLD is dedicated to creating an inclusive work environment for everyone. We embrace and celebrate the unique experiences, perspectives, and cultural backgrounds that each employee brings to our workplace. NOVAGOLD strives to foster an environment where our employees feel respected, valued, and empowered, and our team members are at the forefront in helping us promote and sustain an inclusive workplace.

NOVAGOLD’s diversity initiatives are applicable—but not limited—to our practices and policies on recruitment and selection; compensation and benefits; professional development and training; promotions; and the ongoing development of a work environment built on the premise of gender and diversity equity. To that end, we seek out qualified diverse candidates and encourage them to apply for open positions, either from within or outside of the Company. We also seek out opportunities to develop a pipeline of qualified diverse candidates in a particular profession when we are unable to find them ourselves. For example, in 2021 the Company established and continues to fund the NOVAGOLD Mining and Geological Engineering Scholarship at the University of Alaska to help support and encourage undergraduate students seeking bachelor’s degrees in mining or geological engineering, with a focus on supporting underrepresented students.

We encourage:

- Respectful communication and cooperation among all employees.
- Teamwork and employee participation, fostering the representation of all employee perspectives.
- Work/life balance through flexible work schedules to accommodate employees’ varying needs.
- Learning about and, where appropriate, aiding the communities near NOVAGOLD’s projects to promote a greater understanding and respect for diversity in those communities.

#### Safety and Health

NOVAGOLD’s primary objective is to ensure the health and safety of its employees, partners, and contractors, and is reflected in its Health and Safety Policy. Our focus on safety is also reflected at Donlin Gold where a wide-ranging set of policies are implemented at the project site and in the Anchorage office. In 2024, neither Donlin Gold nor NOVAGOLD had any recordable injuries or lost time incidents (“LTIs”). Also see section *Item 7, “Management’s Discussion and Analysis of Financial Condition and Results of Operations”*, below

### Recent Developments

#### Donlin Gold project

Donlin Gold advanced key activities in 2024 to position the project to update technical work and cost estimates. Some of these activities wrapped up in December 2024, such as the completion of metallurgical test work (pilot plant) in Ontario, Canada to confirm proposed optimizations to the flowsheet; advanced work to update the Donlin Gold resource model; and the submittal of the preliminary design packages for Dam Safety Certification to the Alaska Department of Natural Resources (“ADNR”). Comments from the ADNR on the Dam Safety Certification preliminary design packages are anticipated in 2025.

NOVAGOLD and Barrick held a Donlin Gold workshop in Alaska in September 2024 to review the important work completed to date, as well as to discuss next steps for the Donlin Gold project and related activities for 2025. Subsequently, Donlin Gold’s board approved a path forward with a 2025 budget of $43 million on a 100% basis. Camp operations will resume in the coming months to complete grid drilling to refine mine planning assumptions. Efforts will continue to advance key workstreams and preparation for a cost update. Additional work will include project and mine planning, further advancement of the Dam Safety Certificate applications with work on the Detailed Design Packages, steadfast support of pending litigation, and ongoing community relations and government affairs activities. NOVAGOLD will continue to employ concerted and inclusive efforts to advance the Donlin Gold project for the benefit of all our shareholders and Donlin Gold stakeholders.

In 2024, Donlin Gold, Calista Corporation (“Calista”) and The Kuskokwim Corporations (“TKC”) held public open houses in three locations in Anchorage, Bethel, and Crooked Creek, the closest community to the project, as well as two Subsistence Community Advisory Committee (“SCAC”) meetings, the first in Aniak during the second quarter and the second in Anchorage in December. Donlin Gold also established three additional Shared Values Statements, for a total of 18. Donlin Gold’s numerous partnerships in the Y-K region and statewide, aimed at supporting ecological projects, education, summer youth employment programs, and cultural awareness efforts, continue to grow. Together these efforts underscore Donlin Gold’s ongoing engagement with and commitment to local communities, reinforcing existing long-term relationships and addressing specific community needs.

For further information, see section *Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations*, below.

### Reclamation

We will generally be required to mitigate long-term environmental impacts by stabilizing, contouring, re-sloping and re-vegetating various portions of a site after mining and mineral processing operations are completed. These reclamation efforts will be conducted in accordance with detailed plans, which are approved by the appropriate regulatory agencies. In addition, financial assurance acceptable to the regulatory authority with jurisdiction over reclamation must be provided in an amount and form that is determined to be sufficient by the authority to implement the approved reclamation plan in the event that the project owners fail to complete the work as provided in the plan.

### Government and Environmental Regulations

Our exploration and development activities are subject to various national, state, and local laws and regulations in the United States, which govern prospecting, development, mining, production, exports, taxes, labor standards, occupational health, waste disposal, protection of the environment, mine safety, hazardous substances, disclosure requirements and other matters. We have obtained or have pending applications for those licenses, permits or other authorizations currently required to conduct our exploration and development programs. We believe that we are in compliance in all material respects with applicable mining, health, safety and environmental statutes and regulations in the United States. There are no existing orders or directions relating to our current activities with respect to the foregoing laws and regulations. For a more detailed discussion of the various government laws and regulations applicable to our operations and potential negative effects of these laws and regulations, see section *Item 1A, Risk Factors*, below.

### Competition

We compete with other mineral resource exploration and development companies for financing, technical expertise, and the acquisition of mineral properties. Many of the companies with whom we compete have greater financial and technical resources. Accordingly, these competitors may be able to spend greater amounts on the acquisition, exploration, and development of mineral properties. This competition could adversely impact our ability to finance further exploration and to obtain the financing necessary for us to develop the Donlin Gold project.

### Availability of Raw Materials and Skilled Employees

Most aspects of our business require specialized skills and knowledge. Such skills and knowledge include the areas of geology, drilling, resource estimating, metallurgy, mine planning, logistical planning, preparation of pre-feasibility and feasibility studies, permitting, engineering, construction and operation of a mine, financing, legal, human resources, accounting, investor relations, and community relations. Historically, we have found that we can locate and retain appropriate employees and consultants and we believe we will continue to be able to do so.

The raw materials we require to carry on our business are readily available through normal supply or business contracting channels in the United States and Canada. Historically, we have been able to secure the appropriate equipment and supplies required to conduct our contemplated programs. As a result, we do not believe that we will experience any shortages of required equipment or supplies in the foreseeable future.

### Seasonality

Our business can be seasonal as our mineral exploration and development activities take place in southwestern Alaska. Due to the northern climate, work on the Donlin Gold project can be limited due to excessive snow cover and cold temperatures. In general, surface work often is limited to late spring through early fall, although work in some locations is more readily and efficiently completed during the winter months when the ground is frozen.

### Gold Price History

The price of gold is volatile and is affected by numerous factors, all of which are beyond our control, such as the sale or purchase of gold by various central banks and financial institutions, inflation, recession, fluctuation in the relative values of the U.S. dollar and foreign currencies, changes in global and regional gold demand, in addition to international and national political and economic conditions.

The following table presents the annual high, low and average daily afternoon London Bullion Market Association (“LBMA”) Gold Price over the past five calendar years on the London Bullion Market ($/ounce):

| Year | High | Low | Average |
| --- | ---: | ---: | ---: |
| 2020 | $2,067 | $1,474 | $1,770 |
| 2021 | $1,943 | $1,684 | $1,799 |
| 2022 | $2,039 | $1,628 | $1,800 |
| 2023 | $2,078 | $1,811 | $1,941 |
| 2024 | $2,784 | $1,985 | $2,387 |
| 2025 (through January 13) | $2,687 | $2,632 | $2,658 |

On January 13, 2025, the afternoon LBMA gold price was $2,670 per ounce.

Data Source: lbma.org.uk

### Available Information

We maintain a website at www.novagold.com and make available, through the Investors section of the website, our Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, Section 16 filings and all amendments to those reports, as soon as reasonably practicable after such material is electronically filed with the Securities and Exchange Commission (“SEC”). These reports are also available at the SEC website at www.sec.gov. Certain other information, including but not limited to the Company’s Corporate Governance Guidelines, the charters of key committees of its Board of Directors and its Code of Business Conduct and Ethics are also available on the website. Our website and the information contained therein or connected thereto are not intended to be, and are not incorporated into this Annual Report on Form 10-K.

## Risk factors

As filed, 55,115 characters.

*You should carefully consider the following risk factors in addition to the other information included in this Annual Report on Form 10-K. Each of these risk factors could adversely affect our business, operating results and financial condition, as well as adversely affect the value of an investment in our common shares. The risks described below are not the only ones facing the Company. Additional risks that we are not presently aware of, or that we currently believe are immaterial, may also adversely affect our business, operating results and financial condition. We cannot assure you that we will successfully address these risks and caution that other unknown risks may exist or may arise that may affect our business.*

An investment in our securities is speculative and involves a high degree of risk due to the nature of our business and the present stage of exploration and development of our mineral properties. The following risk factors, as well as risks not currently known to us, could materially adversely affect our future business, operations and financial condition and could cause them to differ materially from the estimates described in the forward-looking statements relating to us.

### Risks Related to Our Business

***We have no history of commercially producing precious metals from our mineral exploration properties and there can be no assurance that we will successfully establish mining operations or profitably produce precious metals.***

The Donlin Gold project is not in production or currently under construction, and we have no ongoing mining operations or revenue from mining operations. Mineral exploration and development has a high degree of risk and few properties that are explored are ultimately developed into producing mines. The future development of the Donlin Gold project will require obtaining permits and financing the construction and operation of mines, processing plants and related infrastructure. As a result, we are subject to all of the risks associated with establishing new mining operations and business enterprises, including:

- the need to obtain and maintain necessary environmental and other governmental approvals and permits, and the timing and conditions of those approvals and permits;
- the availability and cost of funds to finance construction and development activities;
- the timing and cost, which can be considerable, of the construction of mining and processing facilities as well as related infrastructure;
- potential opposition from NGOs, environmental groups or local groups which may delay or prevent development activities;
- potential increases in construction and operating costs due to changes in the cost of labor, fuel, power, materials and supplies, services, and foreign exchange rates;
- the availability and cost of skilled labor and mining equipment; and
- the availability and cost of appropriate smelting and/or refining arrangements.

The costs, timing and complexities of mine construction and development are increased by the remote location of our mineral properties, with additional challenges related thereto, including access, water and power supply, and other support infrastructure. Cost estimates may increase significantly as more detailed engineering work and studies are completed on a project. New mining operations commonly experience unexpected costs, problems and delays during development, construction, and mine start-up. In addition, delays in the commencement of mineral production often occur. Accordingly, there are no assurances that our activities will result in profitable mining operations, or that we will successfully establish mining operations, or profitably produce precious metals at the Donlin Gold project.

In addition, there is no assurance that our mineral exploration activities will result in any discoveries of new ore bodies. If further mineralization is discovered there is also no assurance that the mineralized material would be economical for commercial production. Discovery of mineral deposits is dependent upon a number of factors and significantly influenced by the technical skill of the exploration personnel involved. The commercial viability of a mineral deposit is also dependent upon a number of factors which are beyond our control, including the attributes of the deposit, commodity prices, government policies and regulation, and environmental protection requirements.

***We are dependent on the cooperation of a third party in the exploration and development of our Donlin Gold project.***

Our success with respect to the Donlin Gold project depends on the cooperation of a third party with whom we have an agreement; we hold a 50% interest and the remaining 50% interest is held by the third party that is not under our control or direction. We are dependent on the cooperation of a third party for the progress and development of the Donlin Gold project. The third party may have different priorities which could impact the timing and cost of development of the Donlin Gold project. If the third party defaults on its agreement with us, with or without our knowledge, it may put the mineral property and related assets at risk. The existence or occurrence of one or more of the following circumstances and events could have a material adverse impact on our ability to achieve our business plan, profitability, or the viability of our interests held with the third party, which could have a material adverse impact on our business, future cash flows, earnings, results of operations and financial condition: (i) disagreement with the third party on how to develop and operate the Donlin Gold project efficiently; (ii) inability to exert influence over certain strategic decisions made in respect of the jointly-held Donlin Gold project; (iii) inability of the third party to meet its obligations to the joint business or other parties; and (iv) litigation with the third party regarding joint business matters.

***We may choose to proceed with a feasibility study for the Donlin Gold project without the participation of the co-owner, which would require significant management time and additional capital resources.***

Although proposed by NOVAGOLD, currently the owners have not agreed to commence an updated feasibility study. The Company may choose to proceed with a feasibility study for the Donlin Gold project on its own without the participation of the co-owner, although the Company has not yet made a determination to do so. Embarking on a feasibility study is an endeavor requiring significant funding and staffing. We expect a feasibility study would take approximately two years to complete once commenced and would require significant management time and attention. In addition, if the Company ultimately decides to proceed with its own feasibility study for the Donlin Gold project, the Company will be required to raise additional capital through means such as equity and/or debt financing to successfully complete the feasibility study. There can be no assurance that the Company could raise the required capital on terms favorable to it, or at all.

***We have a history of net losses and expect losses to continue for the foreseeable future.***

The Donlin Gold project has not advanced to the commercial production stage and we have no history of earnings or cash flow from operations. We expect to continue to incur net losses unless and until such time the Donlin Gold project commences commercial production and generates sufficient revenues to fund continuing operations. The development of our mineral properties to achieve production will require the commitment of substantial financial resources. The amount and timing of expenditures will depend on a number of factors, including the progress of ongoing exploration and development, the results of consultants’ analyses and recommendations, the rate at which operating losses are incurred, the process of obtaining required government permits and approvals, the availability and cost of financing, the participation of our partners, and the execution of any sale or joint venture agreements with strategic partners. These factors, and others, are beyond our control. There is no assurance that we will be profitable in the future.

### We have a limited property portfolio.

At present, our only material mineral property is the interest that we hold in the Donlin Gold project. Unless we acquire or develop additional mineral properties, we will be solely dependent upon this property. If no additional mineral properties are acquired by us, any adverse development affecting our operations and further development at the Donlin Gold project may have a material adverse effect on our financial condition and results of operations.

***Our ability to continue the exploration, permitting, development, and construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing.***

We have limited financial resources. We will need external financing to develop and construct the Donlin Gold project. According to the S-K 1300 Report (as defined below), the total initial capital cost estimate for the Donlin Gold project is approximately $7,402 million which includes the costs related to the natural gas pipeline (100% basis). These cost estimates may change materially as our studies are updated. Our failure to obtain sufficient financing could result in the delay or indefinite postponement of exploration, development, construction, or production at the Donlin Gold project. The cost and terms of such financing may significantly reduce the expected benefits from development of the Donlin Gold project and/or render such development uneconomic. There can be no assurance that additional capital or other types of financing will be available when needed or that, if available, the terms of such financing will be favorable. Our failure to obtain financing could have a material adverse effect on our growth strategy and results of operations and financial condition.

We intend to fund our near-term business plan from working capital. Longer term, our ability to continue future exploration, permitting, development, and construction activities, if any, will depend in part on our ability to obtain suitable equity, debt, or other forms of financing. If we raise additional funding by issuing additional equity securities or other securities that are convertible into equity securities, such financing may substantially dilute the interest of existing or future shareholders. Sales or issuances of a substantial number of securities, or the perception that such sales could occur, may adversely affect the prevailing market price for our common shares. With any additional sale or issuance of equity securities, investors will suffer dilution of their voting power and may experience dilution in earnings per share.

There can be no assurance that we will commence production at the Donlin Gold project or generate sufficient revenues to meet our obligations as they become due or obtain necessary financing on acceptable terms, if at all. Our failure to meet our ongoing obligations on a timely basis could result in the loss or substantial dilution of our interests (as existing or as proposed to be acquired) in the Donlin Gold project. In addition, should we incur significant losses in future periods, we may be unable to continue as a going concern, and realization of assets and settlement of liabilities in other than the normal course of business may be at amounts materially different than our estimates.

***Actual capital costs, operating costs, production and economic returns may differ significantly from those we have anticipated and there are no assurances that any future development activities will result in profitable mining operations.***

The capital costs to take the Donlin Gold project into production may be significantly higher than anticipated. As a result of the content updates included in the 2021 Technical Report (as defined below) and S-K 1300 Report, the total initial capital cost estimate for the Donlin Gold project is $7,402 million and the total sustaining capital estimate is $1,723 million.

We do not have an operating history upon which we can base estimates of future operating costs. Decisions about the development of the Donlin Gold project will ultimately be based upon feasibility studies. Feasibility studies derive estimates of cash operating costs based upon, among other things:

- anticipated tonnage, grades and metallurgical characteristics of the ore to be mined and processed;
- anticipated recovery rates of gold and other precious metals from the ore;
- cash operating costs of comparable facilities and equipment; and
- anticipated climatic conditions.

Capital costs, operating costs, production and economic returns, and other estimates contained in studies or estimates prepared by or for us may differ significantly from those anticipated by our current or future studies and estimates, and there can be no assurance that the initial capital costs incurred to construct, and the sustaining capital and operating costs incurred in operating the Donlin Gold project will not be higher than currently anticipated.

***Changes in the market price of gold, which in the past has fluctuated widely, affect our financial condition.***

Our profitability and long-term viability will depend, in large part, upon the market price of gold that may be produced from our Donlin Gold project. The market price of gold is volatile and is impacted by numerous factors beyond our control, including:

- global or regional consumption patterns;
- expectations with respect to the rate of inflation;
- the relative strength of the U.S. dollar and certain other currencies;
- interest rates;
- global or regional political or economic conditions, including interest rates and currency values;
- supply and demand for jewelry and industrial products containing gold; and
- sales or purchases by central banks and other holders, speculators, and producers of gold in response to any of the above factors.

We cannot predict the effect of these factors on the price of gold. A decrease in the market price of gold could affect our ability to finance the development of the Donlin Gold project, which would have a material adverse effect on our financial condition and results of operations. There can be no assurance that the market price of gold will remain at current levels or that such prices will improve. An increase in worldwide supply, and consequent downward pressure on prices, may result over the longer term from increased production from the development of new or expansion of existing mines. There is no assurance that if commercial quantities of gold are discovered, that a profitable market may exist or continue to exist for a production decision to be made or for the ultimate sale of gold.

***General economic conditions may adversely affect our growth, future profitability and ability to finance.***

Some key impacts which can contribute to financial market turmoil potentially impacting the mining industry include contraction in credit markets resulting in a widening of credit risk, imposition of trade tariffs among various countries, devaluations, high volatility in global equity, commodity, foreign exchange and precious metal markets and a lack of market liquidity. The prices of gold and gold mining company equities have experienced significant volatility over the past few years.

A decrease in the price of gold or tightening of credit in the financial markets or other economic conditions, including but not limited to, consumer spending, employment rates, business conditions, inflation, fuel and energy costs, consumer debt levels, lack of available credit, the state of the financial markets, interest rates and tax rates, may adversely affect our ability to finance development and construction of the Donlin Gold project. Specifically:

- global economic conditions could make other investment sectors more attractive, thereby affecting the cost and availability of financing to us and our ability to achieve our business plan;
- the imposition of protectionist or retaliatory trade tariffs by countries may impact our ability to import materials needed to construct our projects or conduct our operations, or to export our products, at prices that are economically feasible for our operations, or at all;
- the volatility of metal prices would impact the economic viability of the Donlin Gold project and any future revenues, profits, losses and cash flow;
- negative economic pressures could adversely impact demand for future production from the Donlin Gold project;
- construction related costs could increase and adversely affect the economics of the Donlin Gold project;
- volatile energy, commodity and consumables prices and currency exchange rates would impact our future production costs; and
- the devaluation and volatility of global stock markets would impact the valuation of our equity and other securities.

***Opposition to our operations from local stakeholders or NGOs could have a material adverse effect on us.***

There is ongoing public concern relating to the effect of mining production on its surroundings, communities, and environment. Local communities and NGOs, some of which oppose resource development, are often vocal critics of the mining industry. While we seek to operate in a socially responsible manner, opposition to extractive industries or our operations specifically or adverse publicity generated by local communities or NGOs related to extractive industries, or our operations specifically, could have an adverse effect on our reputation and financial condition or our relationships with the communities in which we operate. As a result of such opposition or adverse publicity, we may be unable to obtain permits necessary for our operations or to continue our operations as planned or at all. See “Recent Developments” above.

***We require various permits to conduct our current and anticipated future operations, and delays or a failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained, could have a material adverse impact on us.***

Our current and anticipated future operations, including further exploration and development activities and commencement of production on the Donlin Gold project, require permits from various United States federal, state, and local governmental authorities. There can be no assurance that all permits that we require for the construction of mining facilities and to conduct mining operations will be obtainable on reasonable terms, or at all. Delays or a failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained, could have a material adverse impact on us.

The duration and success of efforts to obtain and renew permits are contingent upon many variables not within our control. Shortage of qualified and experienced personnel in the various levels of government could result in delays or inefficiencies. Backlog within the permitting agencies could affect the permitting timeline of the various projects. Other factors that could affect the permitting timeline include (i) the number of other large-scale projects currently in a more advanced stage of development which could slow down the review process and (ii) significant public response regarding a specific project. Also, it can be difficult to assess what specific permitting requirements will ultimately apply to the Donlin Gold project.

***The quantities for our mineral resources and mineral reserves are estimates based on interpretation and assumptions and may yield less mineral production under actual conditions than is currently estimated.***

Unless otherwise indicated, mineralization quantities presented in this Annual Report on Form 10-K and in our other filings with securities regulatory authorities, press releases and other public statements that may be made from time to time are based upon estimates made by our personnel and independent professionals. In addition, these estimates are imprecise and depend upon geologic interpretation and statistical inferences drawn from drilling and sampling analysis, which may prove to be unreliable. There can be no assurance that:

- these estimates will be accurate;
- mineral reserve, mineral resource or other mineralization figures will be accurate; or
- this mineralization could be mined, processed, or sold profitably.

Because we have not commenced commercial production at the Donlin Gold project, mineralization estimates may require adjustments, including potential downward revisions based upon further exploration or development work, actual production experience, or changes in the price of gold. In addition, the grade of ore ultimately mined, if any, may differ from that indicated by drilling results. There can be no assurance that the percentage of minerals recovered in small-scale tests will be duplicated in large-scale tests under on-site conditions or at production scale.

Mineral resource estimates for mineral properties that have not commenced production are based, in many instances, on limited and widely spaced drill hole information, which is not necessarily indicative of the conditions between and around drill holes. Accordingly, such mineral resource estimates may require revision as more drilling information becomes available or as actual production experience is gained. No assurance can be given that any part or all of our mineral resources constitute or will be converted into reserves.

The estimating of mineral reserves and mineral resources is a subjective process that relies on the judgment and experience of the persons preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. By their nature, mineral resource and reserve estimates are imprecise and depend, to a certain extent, upon analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. There can be no assurances that actual results will meet the estimates contained in studies.

Estimated mineral reserves or mineral resources may have to be recalculated based on changes in metal prices, further exploration or development activity, or actual production experience. In addition, if production costs increase, recovery rates decrease, if applicable laws and regulations are adversely changed, there is no assurance that the anticipated level of recovery will be realized or that mineral reserves or mineral resources as currently reported can be mined or processed profitably. This could materially and adversely affect estimates of the volume or grade of mineralization, estimated recovery rates or other important factors that influence mineral reserve or mineral resource estimates. The extent to which mineral resources may ultimately be reclassified as mineral reserves is dependent upon the demonstration of their profitable recovery. Any material changes in mineral resource estimates and grades of mineralization will affect the economic viability of placing a mineral property into production and a mineral property’s return on capital. We cannot provide assurance that mineralization identified at the Donlin Gold project can or will be mined or processed profitably.

The mineral resource and mineral reserve estimates contained in this Annual Report on Form 10-K have been determined and valued based on assumed future prices, cut-off grades and operating costs that may prove to be inaccurate. Extended declines in market prices for gold may render portions of our mineralization uneconomic and result in reduced reported mineralization. Any material reductions in estimates of mineralization, or of our ability to extract this mineralization, could have a material adverse effect on our ability to implement our business strategy, the results of operations or our financial condition.

We have established the presence of proven and probable mineral reserves at the Donlin Gold project in accordance with the disclosure definition and standards contained in S-K 1300 (as defined below) and in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”). There can be no assurance that additional mineral resources will ultimately be reclassified as mineral reserves. The failure to increase mineral reserves could restrict our ability to successfully implement our strategies for long-term growth and could impact future cash flows, earnings, results of operation and financial condition.

***Lack of infrastructure could delay or prevent us from developing the Donlin Gold project.***

Completion of the development of the Donlin Gold project is subject to various requirements, including the availability and timing of acceptable arrangements for power, water, transportation, access, and facilities. The lack of availability on acceptable terms or the delay in the availability of any one or more of these items could prevent or delay development of the project. There can be no assurance that adequate infrastructure, including access and power supply, will be built, that it will be built in a timely manner or that the cost of such infrastructure will be reasonable or that it will be sufficient to satisfy the requirements of the project. If adequate infrastructure is not available in a timely manner, there can be no assurance that:

- the development of the Donlin Gold project will be commenced or completed on a timely basis, if at all;
- the resulting operations will achieve the anticipated production volume; or
- the construction costs and ongoing operating costs associated with the development of the Donlin Gold project will not be higher than anticipated.

Access to the Donlin Gold project is limited and there is no infrastructure that serves the project area. An approximately 507-kilometer natural gas pipeline is needed to supply fuel to the proposed on-site generating plant to provide power for the Donlin Gold project. The proposed pipeline would traverse generally undeveloped areas in Alaska that are difficult to access. Transportation of most of the supplies needed to construct and operate the Donlin Gold project would be accomplished by barging materials on the Kuskokwim River during the annual shipping season which typically occurs from late April to mid-October. Two ports would be needed on the Kuskokwim River, the first located in Bethel, Alaska, where ocean barges would transition materials to river barges; and the second located approximately 320 kilometers upriver from Bethel. A 48-kilometer access road from the upriver port to the project site is needed to deliver the materials. Additionally, a 1,500-meter airstrip would be built to provide year-round access to the project. Terrain, geologic conditions, ground conditions, steep slopes, river levels, ice breakup, weather, climate change impacts and other natural conditions that are beyond our control along the pipeline and transportation routes present design, permitting, construction, and operational challenges for the project. Cost and schedule estimates may increase significantly as more detailed engineering work, geotechnical and geological studies are completed.

***Title and other rights to our mineral properties are subject to agreements with other parties.***

The subsurface mineral and surface rights at the Donlin Gold project are owned by Calista and TKC, respectively, two Native corporations. Donlin Gold operates on these lands pursuant to a Mining Lease with Calista (“Calista Lease”) and a Surface Use Agreement (“SUA”) with TKC. The ability of Donlin Gold to continue to explore and develop the Donlin Gold project depends upon its continued compliance with the terms and conditions of the Calista Lease and SUA. Furthermore, our ability to continue to explore and develop other mineral properties may be subject to agreements with other third parties, including agreements with Native corporations, for instance.

***Our largest shareholder has significant influence on us and may also affect the market price and liquidity of our securities.***

Electrum Strategic Resources L.P. (“Electrum”) and its affiliate GRAT Holdings LLC hold in the aggregate 25.4% of our issued and outstanding common shares as of January 13, 2025. Accordingly, Electrum and its affiliates will have significant influence in determining the outcome of any corporate transaction or other matter submitted to the shareholders for approval, including mergers, consolidations, and the sale of all or substantially all of our assets and other significant corporate actions. Unless full participation of all shareholders takes place in such shareholder meetings, Electrum and its affiliates may be able to approve such matters itself. The concentration of ownership of the common shares by Electrum and its affiliates may: (i) delay or deter a change of control of the Company; (ii) deprive shareholders of an opportunity to receive a premium for their common shares as part of a sale of the Company; and (iii) affect the market price and liquidity of the common shares. In conjunction with the January 22, 2009 financing, we provided Electrum with the right to designate an observer at all meetings of the Board and any committee thereof so long as Electrum and its affiliates hold not less than 15% of our common shares. In November 2011, Dr. Thomas S. Kaplan, was appointed Chairman of our Board. Dr. Kaplan is also the Chairman, Chief Executive Officer, and Chief Investment Officer of The Electrum Group LLC. As long as Electrum and its affiliates maintain its shareholdings in the Company, Electrum will have significant influence in determining the members of the Board. Without the consent of Electrum, we could be prevented from entering into transactions that are otherwise beneficial to us. The interests of Electrum and its affiliates may differ from or be adverse to the interests of our other shareholders. The effect of these rights and Electrum’s influence may impact the price that investors are willing to pay for our shares. If Electrum or its affiliates sell a substantial number of our common shares in the public market, the market price of the common shares could be adversely impacted. The perception among the public that these sales will occur could also contribute to a decline in the market price of our common shares.

***Some of the directors and officers have conflicts of interest as a result of their involvement with other natural resource companies.***

Certain of our directors and officers also serve as directors, or have significant shareholdings in, other companies involved in natural resource exploration and development or mining-related activities. To the extent that such other companies may participate in ventures in which we may participate in or in ventures which we may seek to participate in, the directors and officers may have a conflict of interest. In all cases where the directors or officers have an interest in other companies, such other companies may also compete with us for the acquisition of mineral property investments. Any decision made by any of these directors and officers involving the Company will be made in accordance with their duties and obligations to deal fairly and in good faith with a view to the best interests of the Company. In addition, each of the directors is required to declare and refrain from voting on any matter in which these directors may have a conflict of interest in accordance with the procedures set forth in the Business Corporations Act (British Columbia) and other applicable laws. In appropriate cases, the Company will establish a special committee of independent directors to review a matter in which several directors, or management, may have a conflict. Nonetheless, as a result of these conflicts of interest, the Company may not have an opportunity to participate in certain transactions, which may have a material adverse effect on the Company’s business, profitability, financial condition, results of operation, and prospects.

***We have ongoing reclamation on some of our mineral properties and may be required to fund additional work that could have a material adverse effect on our financial position.***

Land reclamation requirements are generally imposed on mineral exploration companies (as well as companies with mining operations) to minimize long term effects of land disturbance. Reclamation may include requirements to:

- treat ground and surface water to applicable water standards;
- control dispersion of potentially deleterious effluents;
- reasonably re-establish pre-disturbance landforms and vegetation; and
- provide adequate financial assurance to ensure required reclamation of land affected by our activities.

Exploration and other activities at the Donlin Gold project site have created disturbance that must be reclaimed. Financial resources spent on reclamation might otherwise be spent on further exploration and development programs. In addition, regulatory changes could increase our obligations to perform reclamation and mine closure activities. There can be no assurance that we will not be required to fund additional reclamation work at the site that could have a material adverse effect on our financial position.

### We are exposed to credit, liquidity, and interest rate risk.

Credit risk is the risk of an unexpected loss if a customer or third party to a financial instrument fails to meet its contractual obligations. Our cash equivalents and term deposit investments are held through large Canadian chartered banks with high investment-grade ratings. These investments mature at various dates over the current operating period. A portion of the proceeds from the sale of our Galore Creek assets include notes receivable from a subsidiary of Newmont Corporation (“Newmont”), a publicly traded company with investment-grade credit ratings. The notes receivable included a $75 million note receivable of which payment was received on July 27, 2021 and included a $25 million note receivable of which payment was received on July 27, 2023. An additional $75 million will be receivable if and when a Galore Creek project construction plan is approved by the owner(s). No value was assigned to the final $75 million contingent note receivable due to the uncertainty with regards to the approval of a Galore Creek project construction plan. The carrying amount of financial assets recorded in the financial statements, net of any allowances for losses, represents our maximum exposure to credit risk.

Liquidity risk is the risk that we will not be able to meet our financial obligations as they come due. We manage liquidity risk through regular cash flow forecasts to assess our current and future financial position as well as maintaining a prudent capital structure. Accounts payable and accrued liabilities are due within one year from the balance sheet date.

Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates. The risk that we will realize a loss as a result of a decline in the fair value of the term deposit investments is limited because these investments have an original term of less than one year and are generally held to maturity. The promissory note owed to Barrick is variable with the U.S. prime rate. Based on the amount owing on the promissory note as of November 30, 2024, and assuming all other variables remain constant, a 1% change in the U.S. prime rate would result in an increase/decrease of approximately $1.5 million in the interest accrued on the promissory note per annum. For more detail with respect to the promissory note, see section *Item 2, Properties – Donlin Gold Project, Alaska*, below.

### Risks Related to Our Industry

***Mining is inherently risky and subject to conditions or events some of which are beyond our control, and which could have a material adverse effect on our business.***

Mining involves various types of risks, including:

- environmental hazards;
- industrial accidents;
- metallurgical and other processing problems;
- unusual or unexpected geologic formations and conditions;
- structural cave-ins or slides;
- flooding;
- fires;
- power outages;
- labor disruptions;
- explosions;
- landslides and avalanches;
- mechanical equipment and facility performance problems;
- availability of materials and equipment;
- metals losses; and
- periodic interruptions due to inclement or hazardous weather conditions.

These risks could result in damage to, or destruction of, mineral properties, production facilities or other properties; personal injury or death, including to employees; environmental damage; delays in construction or mining operations; increased production costs; asset write downs; monetary losses; and possible legal liability. We may not be able to obtain insurance to cover these risks at economically feasible premiums or at all. Insurance against certain environmental risks, including potential liability for pollution or other hazards as a result of the disposal of waste products occurring from mineral production, is not generally available to us or to other companies within the mining industry. We may suffer a material adverse impact on our business if we incur losses related to any significant events that are not covered by our insurance policies.

Exploration, construction, and production activities may be limited or delayed by inclement weather and shortened exploration, construction and operating seasons. For example, Donlin Gold proposes to transport the bulk of the supplies required to operate the Donlin Gold project to the site from ports in the United States and Canada. This would require the supplies to be transported by barge on the Kuskokwim River which is free of ice and open for barge traffic for a limited period each year. Delays in the ice breakup or early freeze-up, low flow levels and water depths, or other conditions affecting the Kuskokwim River could delay or prevent Donlin Gold from transporting supplies to the site. Any such interference with the delivery of needed supplies to the Donlin Gold project could adversely affect the construction or operation of the project and/or the costs associated with these activities which, in turn, would adversely affect our business.

### We are subject to significant governmental regulation.

Our operations, exploration and development activities in the United States, are subject to extensive federal, state and local laws and regulations governing various matters, including:

- environmental protection;
- management and use of toxic substances and explosives;
- management of tailings and other wastes generated by our operations;
- management of natural resources;
- exploration and development of mines, production and post-closure reclamation;
- exports;
- price controls;
- taxation, tariffs and mining royalties;
- regulations concerning business dealings with indigenous groups;
- availability and use of water resources;
- labor standards and occupational health and safety, including mine safety; and
- preservation of historic and cultural resources.

Failure to comply with applicable laws and regulations may result in civil or criminal fines or penalties or enforcement actions, including orders issued by regulatory or judicial authorities enjoining, curtailing or closing operations or requiring corrective measures, installation of additional equipment or remedial actions, any of which could result in us incurring significant expenditures. We may also be required to compensate private parties suffering loss or damage by reason of a breach of such laws, regulations or permitting requirements. It is also possible that future laws and regulations, or a more stringent enforcement of current laws and regulations by governmental authorities, could cause additional expense, capital expenditures, restrictions on or suspensions of our operations and delays in the exploration and development of our mineral properties.

***Our activities are subject to environmental laws and regulations that may increase our costs of doing business and restrict our operations.***

Our exploration, potential development and production activities in the United States are subject to regulation by governmental agencies under various environmental laws. To the extent that we conduct exploration activities or undertake new mining activities in other foreign countries, we will also be subject to environmental laws and regulations in those jurisdictions. These laws address emissions into the air, discharges into water, management of waste, management of hazardous substances, use of water, protection of natural resources, antiquities and endangered species, and reclamation of lands disturbed by mining operations. Environmental legislation and regulations continue to evolve, and the trend has been toward stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and increasing responsibility for companies and their officers, directors and employees. Compliance with environmental laws and regulations may require significant capital outlays on our behalf and may cause material changes or delays in our intended activities. There can be no assurance that future changes in environmental regulations will not adversely affect our business, and it is possible that future changes in these laws or regulations could have a significant adverse impact on some portion of our business, causing us to re-evaluate those activities at that time.

Environmental hazards may exist on our mineral properties that are unknown to us at the present time, and that have been caused by previous owners or operators or that may have occurred naturally. We may be liable for remediating such damage.

Failure to comply with applicable environmental laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities, causing operations to cease or to be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions.

***Our insurance will not cover all of the potential risks associated with mining operations.***

Our business is subject to a number of risks and hazards generally including adverse environmental conditions, industrial accidents, labor disputes, unusual or unexpected geological conditions, ground or slope failures, cave-ins, changes in the regulatory environment and natural phenomena, such as inclement weather conditions, floods, hurricanes and earthquakes. Such occurrences could result in damage to mineral properties or production facilities, personal injury or death, environmental damage to our properties or the property of others, delays in construction or mining, monetary losses, and possible legal liability.

Although we maintain insurance to protect against certain risks in such amounts as we consider reasonable, our insurance will not cover all the potential risks associated with a mining company’s operations. We may also be unable to maintain insurance to cover these risks at economically feasible premiums. Insurance coverage may not continue to be available or may not be adequate to cover any resulting liability. Moreover, insurance against risks such as loss of title to mineral property, environmental pollution, or other hazards, as a result of exploration and production is not generally available to us or to other companies in the mining industry on acceptable terms. We might also become subject to liability for pollution or other hazards which may not be insured against or which we may elect not to insure against because of premium costs or other reasons. Losses from these events may cause us to incur significant costs that could have a material adverse effect on our financial performance and results of operations.

***Title and other rights to our mineral properties cannot be guaranteed and may be subject to prior unregistered agreements, transfers or claims and other defects.***

We cannot guarantee that title to our mineral properties will not be challenged. We may not have, or may not be able to obtain, all necessary surface rights to develop a mineral property. Title insurance is generally not available for mineral properties and our ability to ensure that we have obtained secure claim to individual mineral properties or mining concessions may be severely constrained. Our mineral properties may be subject to prior unregistered agreements, transfers or claims, and title may be affected by, among other things, undetected defects. We have not conducted surveys of all the mineral properties in which we hold direct or indirect interests. A successful challenge to the precise area and location of these mineral properties could result in us being unable to operate on our mineral properties as permitted or being unable to enforce our rights with respect to our mineral properties. This could result in us not being compensated for our prior investment relating to the mineral property.

***Rising metal prices encourage mining exploration, development, and construction activity, which in the past has increased demand for and cost of contract mining services and equipment.***

Increases in metal prices tend to encourage increases in mining exploration, development, and construction activities. During past expansions, demand for and the cost of contract exploration, development and construction services and equipment have increased as well. Increased demand for and cost of services and equipment could cause project costs to increase materially, resulting in delays if services or equipment cannot be obtained in a timely manner due to inadequate availability, and increased potential for scheduling difficulties and cost increases due to the need to coordinate the availability of services or equipment, any of which could materially increase project exploration, development, or construction costs, result in project delays, or both. There can be no assurance that increased costs may not adversely affect our development of our mineral properties in the future.

***We may experience difficulty attracting and retaining qualified management and technical personnel to meet our business objectives, and the failure to manage our business effectively could have a material adverse effect on our business and financial condition.***

We are dependent on the services of key executives including our President and Chief Executive Officer and other highly skilled and experienced executives and personnel focused on managing our interests and the advancement of the Donlin Gold project, in addition to the identification of new opportunities for growth and funding. Due to our relatively small size, the loss of these persons or our inability to attract and retain additional highly skilled employees required for the development of our activities may have a material adverse effect on our business or future operations.

### We may be subject to legal proceedings.

Due to the nature of our business, we may be subject to a variety of regulatory investigations, claims, lawsuits, and other proceedings in the ordinary course of our business. The results of these legal proceedings cannot be predicted with certainty due to the uncertainty inherent in litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges and juries and the possibility that decisions may be reversed on appeal. There can be no assurances that these matters will not have a material adverse effect on our business.

### General Risk Factors

***Global climate change is an international concern and could impact our ability to conduct future operations.***

Global climate change is an international issue and receives an enormous amount of publicity. We would expect that the imposition of international treaties or U.S. or Canadian federal, state, provincial, or local laws or regulations pertaining to mandatory reductions in energy consumption or emissions of greenhouse gasses could affect the feasibility of mining projects and increase operating costs.

The Donlin Gold project is not directly threatened by current predictions of sea level rise as it is located inland at elevations 150 meters to 640 meters above sea level. However, changes in sea levels could affect ocean and river transportation and shipping facilities, which would be used to transport supplies, equipment and personnel to the Donlin Gold project and products from the project to world markets. The Donlin Gold project proposes to deliver the vast majority of construction and operations equipment, supplies, consumables, and other required materials to the project site via the Kuskokwim River when it is ice-free. Historically, the Kuskokwim River has been ice-free from late April until mid-October and models based on historic weather and river flow records predict that there would be sufficient flow in the river to allow the transportation of the required materials to the project site annually. If climate changes alter the ice-free season or flow patterns of the Kuskokwim River, the current supply logistics plan for the project may need to be modified.

Climate changes also could affect the availability of water required to sustain operations at the Donlin Gold project. Also, management of water is an essential component of the project’s operating plans. Climate change could require modifications to the project’s water management plan, which may require additional capital investments or increase operating costs, if precipitation increases or decreases relative to historic records.

Extreme weather events (such as increased frequency or intensity of storms, increased snowpack, prolonged drought, and associated fire danger) have the potential to disrupt operations. Where appropriate the Donlin Gold project has developed contingency plans for managing extreme weather conditions; however, extended disruptions to supply lines due to extreme weather could result in interruption of activities at the project site, delay or increase the cost of construction of the project, or otherwise adversely affect our business.

***The Company is dependent upon information technology systems, which are susceptible to disruption, damage, failure, and risks associated with implementation and integration.***

The Company’s information technology systems used in its operations are subject to disruption, damage, or failure from a variety of sources, including, without limitation, computer viruses, security breaches, cyberattacks, natural disasters and defects in design. Cybersecurity incidents are evolving and include, but are not limited to, malicious software, attempts to gain unauthorized access to data or machines and equipment, and other electronic security breaches that could lead to disruptions in systems, unauthorized release of confidential or otherwise protected information, the corruption of data or the disabling, misuse or malfunction of machines and equipment. Various measures have been implemented to manage the Company’s risks related to information technology systems and network disruptions. However, given the unpredictability of the timing, nature and scope of information or operational technology disruptions, the Company could potentially be subject to the compromising of confidential or otherwise protected information, destruction or corruption of data, security breaches, other manipulation or improper use of our systems and networks or financial losses from remedial actions, any of which could have a material adverse effect on cash flows, financial condition or results of operations.

The Company could also be adversely affected by system or network disruptions if new or upgraded information technology systems are defective, not installed properly or not properly integrated into operations. Various measures have been implemented to manage the risks related to the system implementation and modification, but system modification failures could have a material adverse effect on the Company’s business, financial position, and results of operations.

***The Company believes it was a passive foreign investment company (“PFIC”) in 2024 which could have negative tax consequences for U.S. investors.***

U.S. Holders (as defined below under *Item 5. Market for Registrant’s Common Equity, Related Shareholder Matters and Issuer Purchases of Equity Securities “Certain United States Federal Income Tax Considerations for U.S. Holders – U.S. Holders”*) should be aware that the Company believes that it was a PFIC for the fiscal year ended November 30, 2024, and based on current business plans and financial expectations, may be a PFIC in the current tax year and future tax years. If the Company is a PFIC for any year during a U.S. Holder’s holding period, then such U.S. Holder generally will be required to treat any gain realized upon a disposition of common shares and any so-called “excess distribution” received on its common shares as ordinary income, and to pay an interest charge on a portion of such gain or distributions, unless the U.S. Holder makes a timely and effective QEF Election or a Mark-to-Market Election (each as defined below under *Item 5. Market for Registrant’s Common Equity, Related Shareholder Matters and Issuer Purchases of Equity Securities “Certain United States Federal Income Tax Considerations for U.S. Holders – Default PFIC Rules under Section 1291 of the Code”).* A U.S. Holder who makes a QEF Election generally must report on a current basis its share of the Company’s net capital gain and ordinary earnings for any year in which the Company is a PFIC, whether or not the Company distributes any amounts to its shareholders. A U.S. Holder who makes the Mark-to-Market Election generally must include as ordinary income each year the excess of the fair market value of the common shares over the U.S. Holder’s tax basis therein. This paragraph is qualified in its entirety by the discussion below under *Item 5. Market for Registrant’s Common Equity, Related Shareholder Matters and Issuer Purchases of Equity Securities “Certain United States Federal Income Tax Considerations for U.S. Holders.”* Each U.S. Holder should consult its own tax advisor regarding the PFIC rules and the U.S. federal income tax consequences of the acquisition, ownership, and disposition of common shares.

## Cybersecurity

As filed, 4,793 characters.

### Risk Management and Strategy

The Company utilizes a sophisticated network monitoring service as a first line of defense to identify, assess, manage, mitigate and respond to cybersecurity threats, which is supplemented by employee training to ensure rapid internal responsiveness should an incident be detected. The Company regularly assesses the threat landscape and takes a holistic view of cybersecurity risks, with a layered cybersecurity strategy based on prevention, detection and mitigation.

Recognizing the complexity and evolving nature of cybersecurity threats, we have partnered with a third-party cybersecurity company to leverage specialized knowledge and insights, ensuring our cybersecurity strategies and processes remain at the forefront of industry best practices. Our cybersecurity partner works to continuously scan and monitor our networks for threats and vulnerabilities, alert management in real-time with high-risk cybersecurity incidents, provide quarterly management updates summarizing recent cybersecurity activity and provide access to a 24/7 incident response team. This partnership is actively managed by the Chief Financial Officer (“CFO”) to ensure effective implementation.

We recognize the importance of developing, implementing, and maintaining robust cybersecurity measures to safeguard our information systems and protect the confidentiality, integrity, and availability of our data. As a result, we have integrated cybersecurity risk management into our broader risk management framework to promote a holistic approach toward assessing, identifying, and managing material risks associated with cybersecurity threats. This integration ensures that cybersecurity considerations are an integral part of the decision-making processes throughout our organization.

As of the date of this Annual Report, we have not identified risks from cybersecurity threats, including threats from any previous cybersecurity incidents, that have or are reasonably likely to materially affect us, including our operations, business strategy, results of operations, or financial condition. While we continually work to safeguard the information systems we use, and the proprietary, confidential and personal information residing therein, and mitigate potential risks, there can be no assurance that such actions will be sufficient to prevent cybersecurity incidents or mitigate all potential risks to such systems, networks and data or those of our third-party providers. For additional information, refer to Item 1A, “*Risk Factors – The Company is dependent upon information technology systems, which are susceptible to disruption, damage, failure, and risks associated with implementation and/or integration”,* above.

The Audit Committee has been delegated, by and on behalf of the Board, direct and primary oversight of the Company’s cybersecurity risk exposures and the steps taken by management to monitor, mitigate and manage/respond to cybersecurity risks and incidents. The CFO is responsible for overseeing NovaGold’s cybersecurity program and other IT activities. No less than annually, the CFO briefs the Audit Committee on the effectiveness of the Company’s cyber risk management program on a wide range of topics, including recent developments, vulnerability assessments, the threat environment, technological trends and information security considerations arising with respect to the Company. The Board and the Audit Committee receive prompt and timely information regarding any cybersecurity incident that meets the SEC, Canadian Securities Administrators and stock exchange-established reporting thresholds, as well as ongoing updates and follow-up disclosures regarding any such incident until it has been wholly addressed and remediated.

### Governance

Cybersecurity is an important part of our risk management processes and an area of focus for our Board and management team. Our Audit Committee is responsible for the Board-level oversight of risks from cybersecurity threats. Members of our Audit Committee receive updates from the CFO at least annually and more frequently if warranted, regarding Company practices, programs, and other developments related to cybersecurity, cyber threats and our cybersecurity risk management and strategy program. Our Audit Committee is comprised of Board members with diverse and relevant expertise in risk management and strategy, sufficient to oversee cybersecurity risks effectively.

We maintain a cybersecurity incident response team composed of professionals across various functions, including information technology, legal, finance, accounting, and risk. This team is trained in managing cybersecurity incidents and leverages the information technology expertise of our third-party cybersecurity partner.

## Properties

As filed, 70,535 characters.

The Company has adopted the mining disclosure standards of *Subpart 229.1300 of Regulation S-K – Disclosure by Registrants Engaged in Mining Operations (“*S-K 1300”). The Company is subject to and required to disclose mineral resources and mineral reserves in accordance with S-K 1300. While the S-K 1300 rules are similar to NI 43-101 rules in Canada, they are not identical and therefore two reports have been produced for the Donlin Gold project. The information in *Item 2, Properties,* below is common to both reports and contains pertinent information required under S-K 1300.

#### Donlin Gold Technical Report (NI 43-101)

The Company retained Wood Canada Limited (“Wood”), an unaffiliated third-party firm comprising mining experts, to update content in its previously filed “*Donlin Creek Gold Project, Alaska, USA, NI 43-101 Technical Report on the Second Updated Feasibility Study,”* effective November 18, 2011, and amended January 20, 2012 (“2011 Mining Study”). Wood’s Qualified Persons (“QPs”) completed an exercise to verify which content in the 2011 Mining Study remains current, and what was required to update the report content with the latest information. Updated content includes operating costs, capital costs, tax rates, long term gold price, and the economic analysis. Additionally, work done on the property since 2011 with respect to exploration, drilling, permitting, and minor mine design changes as a result of recent permitting activities are summarized in the updated content. A data verification exercise was completed by each Wood QP co-authoring the report. This included a September 2020 site visit by two of the report QPs; review of the geologic data, geologic model, and resource model; review of metallurgical test work; review of designs for mining, processing, and infrastructure, including minor design updates; update of capital and operating cost estimates utilizing a combination of cost indices and vendor quotations; and an updated economic analysis. Canadian NI 43-101 Definitions and CIM Definition Standards for Mineral Resources and Mineral Reserves (“CIM Definition Standards”), adopted by CIM Council on May 10, 2014 apply for this exercise.

The Wood review determined that the report updating exercise resulted in no material change to the Mineral Resources or Mineral Reserves. On August 31, 2021, the Company voluntarily filed an updated NI 43-101 technical report for the Donlin Gold project in Alaska, USA, and titled “*NI 43-101 Technical Report on the Donlin Gold Project, Alaska, USA,”* with an effective date of June 1, 2021 (“2021 Technical Report”) reflecting the results of the above exercise. The 2021 Technical Report was prepared by Wood. The 2021 Technical Report is available on the Company’s website, on EDGAR at www.sec.gov and on SEDAR+ at www.sedarplus.ca.

#### Donlin Gold Technical Report Summary (S-K 1300 Report)

The Company is a registrant with the SEC and is reporting its exploration results, Mineral Resources, and Mineral Reserves using the mining disclosure standards of S-K 1300. The Company requested that Wood prepare a Technical Report Summary of the Donlin Gold project, Alaska, USA using the standards of S-K 1300 and it is titled “*S-K 1300 Technical Report Summary on the Donlin Gold Project, Alaska, USA” (“*S-K 1300 Report”), current as of November 30, 2021, with a report date of November 30, 2021. Wood prepared the S-K 1300 Report from the 2011 Mining Study of the Donlin deposits that was completed to at least pre-feasibility level, as defined by S-K 1300, at the time of the study. Material aspects of the 2011 Mining Study were updated by Wood in 2020 and made current. As part of the update process, Wood’s subject matter experts completed an exercise to verify and update the content of the 2011 Mining Study with the latest information under the supervision of Wood’s independent QP co-authors of the S-K 1300 Report. Updated content includes operating costs, capital costs, taxes, forecast long term gold price and the economic analysis. Additionally, work done since 2011 on the property with respect to exploration, drilling, permitting and minor project design changes as a result of recent permitting activities are summarized in the S-K 1300 Report. A data verification exercise was completed by each Wood QP co-authoring the S-K 1300 Report. Wood QPs verified that the updated content of the 2011 Mining Study met at least pre-feasibility level of study as defined in S-K 1300, and it supports the disclosure of exploration results, Mineral Resources, and Mineral Reserves using S-K 1300 standards. The S-K 1300 Report is available on the Company’s website and on EDGAR at www.sec.gov.

#### Results of the Donlin Gold Technical Report (NI 43-101) and Donlin Gold Technical Report Summary (S-K 1300 Report)

Wood reviewed the geologic and resource models that supported the 2011 Mining Study, including comparing them to data from recent drilling programs, and determined that they continue to be adequate and suitable to be used for a Mineral Resource estimation. Using updated cost inputs from the first calendar quarter of 2020, a gold price of $1,500 per ounce, and the geologic and resource models utilized in support of the 2011 Mining Study, the contents within an updated optimized pit shell did not show a material change to the Mineral Resources stated in the 2011 Mining Study. Therefore, the Mineral Resources were considered current as of November 30, 2021 and are unchanged as of November 30, 2024. They continue to have an effective date of July 11, 2011.

Similarly, using updated cost inputs, a gold price of $1,200 per ounce, and the geologic and resource models utilized in support of the 2011 Mining Study with appropriate modifying factors applied for Mineral Reserve estimation, the previous Mineral Reserve ultimate pit was contained within an updated optimized pit shell. Therefore, the Mineral Reserves remained current as of November 30, 2021 and are unchanged. Because the Mineral Reserves are supported by an updated economic analysis they have an effective date of April 27, 2021.

Outside of verifying the Mineral Resource and Mineral Reserve estimates, the primary efforts in the 2021 Technical Report and the S-K 1300 Report were financial and permitting updates. This includes updates to estimated capital costs, operating costs, reclamation and closure costs, royalties, taxes, and economic analysis, as well as current status of the permits. Updated capital costs are based on first calendar quarter 2020 pricing (cost indices and current commodity pricing and equipment quotes) applied to the engineering designs and material take-offs from the 2011 Mining Study, except for minor changes made during permitting in the operations water treatment plant and the natural gas pipeline. As a result of the content updates, the total initial capital cost estimate is $7,402 million, which is an increase of 10.8% or $723 million compared to the 2011 Mining Study total initial capital cost estimate. Likewise, the total sustaining capital estimate is $1,723 million, which is an increase of 14.6% or $219 million compared to the 2011 Mining Study total sustaining capital estimate. The 2011 Mining Study operating costs were updated to first calendar quarter 2020 by updating key cost drivers like energy, labor, consumables, and freight. No material changes to project designs, schedules, or productivities were made; consequently, the manning schedules and consumables remain unchanged. The updated estimated Life of Mine (“LOM”) operating costs total $19,289 million, which is $5.90/t mined, $38.21/t processed, or $635/oz gold sold.

The economic evaluation of the Donlin Gold project in both the 2021 Technical Report and the S-K 1300 Report was updated using the following inputs:

- A production plan based on the 2011 Mining Study of 53,500 t/d open pit gold mine with ore processing by means of flotation, pressure oxidation, and cyanidation. The pit designs and Mineral Reserves were based on the Measured and Indicated Mineral Resource estimates that were verified as remaining current. Annual LOM gold production averages 1.13 million ounces per year over a production life of 27 years, including 1.46 million ounces per year for the first five full years of production.
- $1,500/oz gold price
- Current land and royalty agreements
- Initial and sustaining capital costs, and operating costs updated to first calendar quarter 2020
- Tax payments in accordance with the Tax Cuts and Jobs Act enacted in December 2017 and effective January 1, 2018
- $292 million LOM contributions for reclamation, closure, and financial assurance
- Financing has been assumed on a 100%, all equity, stand-alone basis
- Escalation/inflation has been excluded
- No salvage is assumed at the end of operations

Based on the economic evaluation, the Donlin Gold project generates positive before and after-tax economic results. Total after-tax cash flow is $13,145 million, after-tax NPV at a 5% discount rate is $3,040 million, and the after-tax internal rate of return is 9.2%. After-tax payback is achieved 7.3 years following the start of production.

The following descriptions summarize selected information about the Company’s 50% interest in the Donlin Gold project located in Alaska, USA. Except for subsequent events or as otherwise noted, the disclosure in this Annual Report on Form 10-K of a scientific or technical nature for the Donlin Gold project is based on both the 2021 Technical Report and S-K 1300 Report, as of November 30, 2021. The S-K 1300 Report meets at least a pre-feasibility level. The 2021 Technical Report and the S-K 1300 Report do not incorporate the latest Donlin Gold optimization work on the geologic modeling concepts or other optimization work since these assessments are still underway.

The 2021 Technical Report was filed on EDGAR and SEDAR+ on August 31, 2021. The S-K 1300 Report was filed on EDGAR on January 26, 2022. The 2021 Technical Report and S-K 1300 Report were prepared by Wood.

The 2021 Technical Report has been filed with securities regulatory authorities in each province of Canada and the S-K 1300 Report has been filed with the SEC. Portions of the following information are based on assumptions, qualifications and procedures that are not fully described herein. Reference should be made to the full text of the 2021 Technical Report which is available for review on SEDAR+ at www.sedarplus.ca and the S-K 1300 Report which is available for review on EDGAR at www.sec.gov.

Paul Chilson, P.E., a Qualified Person and an employee of the Company, has approved the mineral reserves and mineral resources included in this Annual Report on Form 10-K as of November 30, 2024 and reviewed the reserves and resources in the S-K 1300 Report and confirmed that the reserves and resources remain current as of November 30, 2024.

### Donlin Gold Project, Alaska, USA

The Donlin Gold project is a development-stage gold project held by Donlin Gold, a limited liability company that is owned 50% by the Company’s wholly-owned subsidiary, NOVAGOLD Resources Alaska Inc., and 50% by Barrick’s wholly-owned subsidiary, Barrick Gold U.S. Inc. The Company’s book value of its investment in the Donlin Gold project is $2.7 million as of November 30, 2024.

The Company entered into the limited liability company agreement with Barrick (“LLC Agreement”) dated December 1, 2007, which provided for the creation of Donlin Gold, that is jointly owned by the Company and Barrick on a 50/50 basis. Pursuant to the LLC Agreement, the Company agreed to reimburse Barrick out of future mine production cash flow for a portion of Barrick’s prior expenditures on the Donlin Gold project. As of November 30, 2024, the promissory note, including accrued interest, amounted to approximately $151.5 million. Funding for the project is currently shared by both parties on a 50/50 basis.

Except for events subsequent to the reports, or as otherwise stated or implied, the scientific and technical information regarding the Donlin Gold project in this Annual Report on Form 10-K is based on both the 2021 Technical Report and the S-K 1300 Report.

### Property Description and Location

The Donlin Gold deposits are situated approximately 62°North latitude and 158°West longitude, which is 450 km west of Anchorage and 250 km northeast of Bethel up the Kuskokwim River. The closest village is the community of Crooked Creek, approximately 20 km to the south, on the Kuskokwim River.

The resource areas are within T. 23 N., R. 49. W., Seward Meridian, Kuskokwim and Mt. McKinley Recording Districts, Crooked Creek Mining District, Iditarod A-5 USGS 1:63,360 topography map. The mineralization is centered on approximately 540222.50 east and 6878534.36 north, using the NAD 83 datum.

The Donlin Gold property is located in the Kuskokwim region of southwestern Alaska on private, Alaska Native-owned mineral and surface land and Alaska state mining claims. The property is under the Calista Lease for subsurface rights and some surface rights from Calista and SUA from TKC, two Alaska Native corporations. Calista is one of 13 regional Alaska Native corporations established as part of the Alaska Native Claims Settlement Act of 1971 (“ANCSA”) and under ANCSA has title to the subsurface estate and some surface rights in the region. TKC was formed in 1977 when the ANCSA village corporations of Lower Kalskag, Upper Kalskag, Aniak, Chuathbaluk, Napaimute, Crooked Creek, Red Devil, Georgetown, Sleetmute and Stony River, which are located along the middle region of the Kuskokwim River, merged. Under ANCSA, TKC has title to extensive surface estate in the region, including most of the project lands. The property hosts a gold deposit currently estimated at 33.8 million ounces of proven and probable mineral reserves averaging 2.09 grams per tonne. The Company believes that significant exploration potential remains in the Donlin Gold district, with prospects to increase mine life and/or justify future production expansions. See *Mineral Reserve and Mineral Resource Estimate*, below.

Other lands required for offsite infrastructure, such as the Jungjuk port site, the road from the port site to the mine site, and natural gas pipeline are categorized as Native, State of Alaska conveyed, or BLM lands. Rights-of-way are required from other Alaska Native corporations, the State of Alaska and BLM for the road and pipeline alignments that cross Native corporation, state, and federal lands.

### Permits

Donlin Gold obtained the necessary permits and certifications that allowed for the exploration, environmental monitoring, and Environmental Impact Study (“EIS”) baseline data collection efforts. The current status of these permits is in line with the termination of the baseline data collection effort, temporary closure of the camp in May 2015, and the seasonal reopening of the site for the geological drill program from July to November 2017, the geotechnical drill program in 2019 and 2023 for the Alaska Dam Safety certificate applications, and the latest geological drill programs in 2020, 2021, and 2022. The active permits include ADNR temporary use of water; ADNR Application for Permit to Mine in Alaska (approval for the 2020, 2021, 2022, and 2023 drill programs), the Corps individual 404 and nationwide 26 permits; Alaska Department of Environmental Conservation (“ADEC”) authorizations (landfill, septic system, multisector stormwater general permit – sector G, air permit); and Federal Aviation Administration approval. Other permits were either put on hold, closed, or allowed to expire.

On August 7, 2012, we announced that Donlin Gold commenced permitting of the project by submitting a draft Plan of Operations and Section 404 Clean Water Act (“CWA”) draft permit application to federal and state regulators. The Section 404 permit application initiated the environmental review process under the National Environmental Policy Act (“NEPA”) which involves preparation of an EIS. The Corps selected AECOM, formerly URS, an independent contractor, to prepare the EIS. The Notice of Intent for the EIS was published in the Federal Register on December 14, 2012, and the NEPA public scoping process was completed on March 29, 2013. During the remainder of 2013 and through 2014 and 2015, Donlin Gold worked to address the remaining data needs for the draft EIS. Donlin Gold also continued to provide application materials and maintained ongoing dialogue with the key permitting agencies. The Corps addressed the cooperating agency comments on the preliminary draft and filed the Notice of Availability for public release of the draft EIS in the Federal Register in November 2015. After the filing of the draft EIS, the Corps issued a schedule for public meetings on the Donlin Gold draft EIS in the Yukon-Kuskokwim (Y-K) region and Anchorage, Alaska. The Corps conducted, and at the end of May 2016 completed, a six-month public comment period for the draft EIS, including 17 public comment meetings in communities across the Y-K region and in Anchorage. The Corps received comments from federal and state agencies, local and tribal governments, Alaska Native organizations, businesses, special interest groups/NGOs, and individuals.

On April 27, 2018, the Notice of Availability of the Donlin Gold final EIS was published in the *Federal Register*. On August 13, 2018, the Corps and the BLM issued a joint Federal Record of Decision (“ROD”) for the Donlin Gold project. Along with the ROD, the Corps issued a combined permit under CWA Section 404 and Section 10 of the Rivers and Harbors Act. Additionally, the BLM issued the Offer to Lease for the ROW for those portions of the natural gas pipeline that would cross federal lands. The Pipeline and Hazardous Materials Safety Administration previously issued a special permit for the natural gas pipeline on June 5, 2018.

Several major State of Alaska permits were also issued and advanced during 2018 through 2023. After a public notice and comment period, ADEC issued a Certificate of Reasonable Assurance under CWA Section 401 on August 10, 2018, indicating that the CWA 404 permit complies with the state’s water quality standards. The Alaska Pollutant Discharge Elimination System (APDES) water discharge permit was issued by ADEC on May 24, 2018 and became effective on July 1, 2018. Donlin Gold submitted its application to ADEC for the regularly scheduled re-issuance of its APDES permit, which originally was to expire in January 2024, but has been administratively extended pending renewal. The State of Alaska Department of Fish and Game (“ADFG”) issued Title 16 Fish Habitat permits for the mine area and transportation corridor on August 30, 2018. The new air quality permit was issued by ADEC on July 1, 2023. The final approvals of the Donlin Gold Reclamation Plan and the Waste Management Permit were issued by ADNR and ADEC, respectively on January 18, 2019. On September 18, 2023, Donlin Gold submitted timely applications to ADEC and ADNR for renewal of the approval and permit. On October 17, 2023, ADEC administratively extended the Waste Management Permit pending renewal. The Reclamation Plan approval, which was also to expire in January 2024, has been administratively extended to January 2026. ADNR issued the easement, land leases, land use permits, and material site authorizations for the proposed transportation facilities, and easement for the fiber optic cable on state lands on January 2, 2020. On January 17, 2020, ADNR’s State Pipeline Coordinator Services issued the final state ROW authorization for the natural gas pipeline. On June 29, 2021, ADNR’s Division of Mining Land and Water issued 12 final Water Rights for the mine site and transportation corridor. On November 1, 2021, ADFG issued two Special Area Permits required for pipeline facilities located within the Susitna Flats State Game Refuge (“Refuge”). One permit authorizes the compressor station, and the other permit authorizes the section of the pipeline ROW in the Refuge. On November 1, 2022, ADNR finalized approval of the proposed re-location plan for public easements in the mine site and transportation facility areas.

The preliminary design packages for the Alaska Dam Safety certificate applications were submitted to the ADNR in December 2024. Issuance of the certificates is anticipated in 2026.

Thirteen of the 56 village councils in the Calista Region (Native Village of Kasigluk, ONC, Native Village of Eek, Tuluksak Native Community, Tununak Council, Native Village of Nunapitchuk, Chuloonawick Tribal Council, Native Village of Kwigillingok, Native Village of Kongiganak, Chefornak Traditional Council, Chevak Native Village, Native Village of Napakiak and Quinhagak) have adopted resolutions opposing development of the Donlin Gold project.

### Mineral Tenure

The Calista Lease between Calista and Donlin Gold, includes subsurface (mineral) rights leased from Calista. Calista also owns the corresponding surface estate on a portion of these lands, the rights to which are also included in the Calista Lease. The Calista Lease provides Donlin Gold with rights to approximately 19,988 hectares of Calista-owned land. The Calista Lease was restated on February 11, 2011, to reflect all assignments and amendments made between its original execution on May 1, 1995 and February 11, 2011. The Calista Lease was amended once again effective June 6, 2014 (the “2014 Amendment”). The 2014 Amendment did not affect the lands subject to the Calista Lease as restated on February 11, 2011.

On June 9, 2014, the Company announced that Donlin Gold and TKC reached an updated long-term SUA for the Donlin Gold project. The SUA with TKC grants non-exclusive surface use rights to Donlin Gold for mining activities. TKC owns and contributed to the SUA the corresponding surface estate over most of Calista’s subsurface estate included in the Calista Lease as well as some additional surface estate. The SUA with TKC provides Donlin Gold with rights to approximately 16,923 hectares of TKC-owned land.

Lyman Resources in Alaska, Inc. (“Lyman Resources”) has an existing placer mining lease covering approximately 1,040 hectares (partially covering six sections) within the Calista Lease area. The Lyman family also has title to approximately 5.7 hectares of surface estate within the Snow Gulch area. The Calista Lease grants priority to extraction of the lode mineralization in the event of a conflict of use between lode and placer mining operations, provided that a two-year notice period is provided to Lyman Resources. Lyman Resources, the Lyman family, and Donlin Gold executed a Surface Lease and Assignment of Mining Lease effective May 9, 2012, leasing the Lyman surface estate and assigning the Lyman placer lease within the Calista Lease area to Donlin for Project mining use (the “Lyman Lease”).

In addition to the leased land, Donlin Gold holds 493 State of Alaska mining claims comprising approximately 29,008 hectares in the Kuskokwim and Mt. McKinley Recording Districts. The mining claims abut and largely surround northern and western boundaries of the lands subject to the Calista Lease and TKC SUA. The mining claims are located on lands that are owned by the State of Alaska (409) and on state-selected lands from the BLM (84). All claims are approximately either 16.2 hectares or 64.8 hectares in size.

The terms for the Calista Lease and TKC SUA include various royalty and other payment provisions and considerations such as shareholder employment and contracting opportunities. The Lyman Lease provides for rent and certain other payments.

Royalty Terms of the Calista Lease include:

- Annual advance minimum royalty (variable) to 2030;
- All advance minimum payments are recoverable as a credit against the net smelter return royalty and net proceeds payment;
- Net smelter return of 1.5% for the earlier of the first five years following commencement of commercial production or until initial capital payback;
- Conversion to a 4.5% net smelter return after the earlier of five years or initial capital payback; and
- Net proceeds royalty of 8% of the net proceeds realized by Donlin Gold LLC commencing with the first quarter in which net proceeds are first realized.

Payment Terms of the TKC SUA include:

- Annual advance minimum payment (variable per milestones);
- All advance minimum payments are recoverable as a credit against the milled tonnage fee and net proceeds payment;
- Milled tonnage fee of $0.40 per tonne processed for the first 10 years of production;
- Conversion of the milled tonnage fee to $0.50 per tonne processed for all production after 10 years;
- Net proceeds payment of 3% of the net proceeds realized by Donlin Gold LLC commencing with the first quarter in which net proceeds are first realized.

The term of the Calista Lease is to April 30, 2031 and extends automatically year to year thereafter, so long as either mining or processing operations are carried out on or with respect to the property in good faith on a continuous basis in such year, or Donlin Gold pays to Calista an advanced minimum royalty of $3.0 million (subject to adjustment for increases in the Consumer Price Index) for such year. The TKC SUA remains in effect through April 30, 2031, and on a year-to-year basis thereafter, so long as the Calista Mining Lease remains in effect. The Lyman Lease has an initial term of 20 years but shall be extended while Donlin Gold conducts operations on the property.

Additional estimated costs associated with various landowner and lease agreements, not already covered in initial capital or G&A operating costs, average approximately $8.6 million per year during the six pre-production years and $2.5 million per year during the 27 operating years. Annual rent, labor expenditures and filings are required to maintain Alaska State mining claims on state land. Mining license tax payments may also apply.

### Accessibility and Climate

The Kuskokwim River is a regional transportation route and is serviced by commercial barge lines. A 25-kilometer winter road, designated as an Alaska State Highway route and transportation corridor, accesses the property from the barge landing at the village of Crooked Creek. The Donlin Gold project currently has an all-season, soft-sided camp. An adjacent 1,500-meter airstrip is capable of handling aircraft as large as L-100 Hercules (approximate cargo capacity of 19,050 kilograms), allowing efficient shipment of personnel, some heavy equipment, and supplies. The Donlin Gold project can be reached directly by charter air facilities out of Anchorage and Aniak, 80 kilometers to the west.

The project area is one of low topographic relief on the western flank of the Kuskokwim Mountains. Elevations range from 150 meters to 640 meters. Ridges are well rounded and easily accessible by all-terrain vehicle. Hillsides are forested with black spruce, tamarack, alder, birch and larch. Soft muskeg and discontinuous permafrost are common in poorly drained areas at lower elevations. The area has a relatively dry interior continental climate with typically less than 500 millimeters total annual precipitation. Summer temperatures are relatively warm and may exceed 30°C. Minimum temperatures may fall to well below -42°C during the cold winter months.

### Exploration History

Approximately 1,678 exploration and development drill holes totaling 367,886 meters, were completed from 1988 through 2007 in at least six separately managed campaigns. Another 108 core holes totaling 33,425 meters were added in 2008 to explore near-pit expansions and satellite deposits, and for facility-related condemnation and geotechnical studies. In 2010, six core holes totaling 2,090 meters were drilled for additional pit slope geotechnical drilling. In 2017, 16 core holes totaling 7,040 meters were drilled; in 2020, 85 core holes totaling 23,361 meters were drilled; in 2021, 79 core holes totaling 24,264 meters were drilled; and in 2022, 141 core holes totaling 42,331 meters were drilled; and in 2023, 42 core holes totaling 1,840 meters for geotechnical and permafrost studies and 13 RC holes totaling 1,279 meters were drilled for pump tests and the installation of ground water monitoring instrumentation.

Approximately 1,396 holes, totaling 339,733 meters, supported the resource model used in the 2011 Mining Study. The remaining holes were either drilled after the completion of the 2011 Mining Study (2017, 2020, 2021, and 2022 drill programs) or were utilized for other purposes, such as district exploration, carbonate resource, facilities condemnation, hydrology, geotechnical, and infrastructure engineering.

| Year | Company | Work Performed | Results |
| --- | --- | --- | --- |
| 1909 to 1956 | Various prospectors and placer miners | Gold discovered in 1909. Placer mining by hand, underground, and hydraulic methods. | Total placer gold production of approximately 30,000 ounces. |
| 1970s to 2015 | Robert Lyman and heirs | Resumed sluice mining in Donlin Gold area and placer mined Snow Gulch. | First year of mining Snow Gulch produced best results, with 800 ounces of gold recovered. Donlin Gold has obtained an agreement with the Lyman family to consolidate the land package around the proposed mine. |
| 1974, 1975 | Resource Associates of Alaska | Regional mineral potential evaluation for Calista. Soil grid and three bulldozer trenches dug in Snow Gulch area. | Soil, rock, and vein samples have anomalous gold values. Trench rock sample results range from 2 to 20 grams per tonne gold. |
| 1984 to 1987 | Calista Corporation | Minor work. Geologists from various mining companies, including Cominco and Kennecott, visit the property. |  |

31

### NOVAGOLD RESOURCES INC.

| Year | Company | Work Performed | Results |
| --- | --- | --- | --- |
| 1986 | Lyman Resources | Auger drilling for placer evaluation finds abundant gray, sulfide rich clay near Quartz Gulch. | Assays of cuttings average over 7 grams per tonne gold. Initial discovery of Far Side (“Carolyn”) prospect. |
| 1987 | Calista Corporation | Rock sampling of ridge tops and auger drill sampling of Far Side prospect. | Anomalous gold values from auger holes: best result = 9.7 grams per tonne gold. |
| 1988 to 1989 | Western Gold Exploration and Mining Co. | Airborne geophysics, geological mapping, and soil sampling over most of the project area. Total of 13,525 meters of D9 Cat trenching at all prospects. Over 15,000 soil, rock chip, and auger samples collected. Drilling included 3,106 feet of AX core drilling, 404 meters in 239 auger holes, and 10,423 meters of RC drilling (125 holes). First metallurgical tests and petrographic work. | Initial work identified eight prospects with encouraging geology (Snow, Dome, Quartz, Carolyn, Queen, Upper Lewis, Lower Lewis, and Rochelieu). Drilling at most of these prospects led to identification of the Lewis areas as having the best bulk-mineable potential. Mineral resource estimate completed. |
| 1993 | Teck Exploration Ltd. | D-9 Cat trenching (1,400 meters) and two 500-meter soil lines in the Lewis areas. Petrographic, fluid inclusion, and metallurgical work. | Identified new mineralized areas, updated Mineral resource estimate. |
| 1995 to 2000 | Placer Dome | 87,383 meters of core, 11,909 meters of RC drilling and 8,493 meters of trenching. Environmental monitoring and assessment. | Drilled the American Creek magnetic anomaly (“ACMA”), discovered the ACMA deposit. Numerous mineral resource estimation iterations. |
| 2001 to 2002 | Donlin Creek Joint Venture (Placer Dome /NOVAGOLD) | 46,495 meters of core, 38,022 meters of RC drilling, 89.5 meters of geotechnical drilling, and 268 meters of water monitoring holes. | Filed a preliminary assessment report on the project. Updated resource estimate. |
| 2003 to 2005 | Donlin Creek Joint Venture (Barrick/NOVAGOLD) | 25,448 meters of core and 5,979 meters of RC drilling. Calcium carbonate exploration drilling; IP lines for facility condemnation studies. | Infill drilled throughout the resource area. Discovered a calcium carbonate resource. Poor quality IP data. |
| 2006 | Donlin Creek Joint Venture | 92,804 meters of core drilling to support mineral resource classification conversion, slope stability, metallurgy, waste rock, carbonate exploration, facilities and port road studies. | Geological model and mineral resource update. |
| 2007 | Donlin Gold Joint Venture | Core drilling totaled 75,257 meters and included resource delineation, geotechnical and engineering, and carbonate exploration. 13 RC holes for monitor wells and pit pump tests totaled 1,043 meters. | Improved pit slope parameters, positive hydrogeological results. Carbonate exploration was negative. Updated mineral resource estimate. Completed feasibility study with positive results. |

32

### NOVAGOLD RESOURCES INC.

| Year | Company | Work Performed | Results |
| --- | --- | --- | --- |
| 2008 | Donlin Gold LLC | 108 core holes totaling 33,425 meters for exploration and facility related geotechnical and condemnation studies. Updated resource models. Metallurgical test work: flotation variability and CN leach. 54 test pits and 37 auger holes were also completed for overburden characterization. | Resource expansion indicated for East ACMA. CN leach resource potential indicated for the main resource area, Snow, and Dome prospects. Facility sites successfully condemned. Updated resource estimates utilizing applicable data through 2007. |
| 2009 | Donlin Gold LLC | 19 geotechnical core holes totaling 950 meters in facility sites and to address hydrology. |  |
| 2010 | Donlin Gold LLC | Six geotechnical core holes totaling 2,090 meters to evaluate slope stability of expanded pit. Also drilled 90 auger holes totaling 585 meters and dug 59 test pits to further evaluate overburden conditions and gravel supplies within the Tailings Storage Facility (“TSF”) area. | Pit slope stability of new pit design remained acceptable. Construction suitability of surficial materials in TSF is evaluated. |
| 2017 | Donlin Gold LLC | 16 core holes totaling 7,040 meters to test targeted mineralized zones, collect structural data related to mineralization, and collect geotechnical data. | Results not included in resource model used in the 2011 Mining Study |
| 2019 | Donlin Gold LLC | 30 geotechnical core holes totaling 1,060 meters were drilled as part of a site investigation program in support of detailed dam design. | Results not included in resource model used in the 2011 Mining Study |
| 2020 | Donlin Gold LLC | 85 core holes totaling 23,361 meters in both the ACMA and Lewis deposits to validate recent geologic modeling concepts and test for extensions of high-grade zones. | Results not included in resource model used in the 2011 Mining Study |
| 2021 | Donlin Gold LLC | 79 core holes totaling 24,264 meters in both the ACMA and Lewis deposits to validate recent geologic modeling concepts and test for extensions of high-grade zones. | Results not included in resource model used in the 2011 Mining Study |
| 2022 | Donlin Gold LLC | 141 core holes totaling 42,331 meters in both the ACMA and Lewis deposits and in the Divide domain overlapping ACMA and Lewis. | Results not included in resource model used in the 2011 Mining Study |
| 2023 | Donlin Gold LLC | 42 core holes totaling 1,840 meters and 13 RC holes totaling 1,279 meters were drilled as part of a site investigation program in support of detailed dam design and hydrogeologic studies. | Results not included in resource model used in the 2011 Mining Study |

### Geology

#### Regional Geology

The Kuskokwim region of southwestern Alaska is predominately underlain by rocks of the Upper Cretaceous Kuskokwim Group that filled a subsided northeast-trending strike-slip basin between a series of amalgamated terranes. Intermediate composition volcano-plutonic complexes intrude and overlie Kuskokwim Group rocks throughout the region.

#### Local Geology

The Donlin Gold deposits lie between two regional, northeast-trending, right lateral fault systems: the Denali-Farewell fault system to the south and the Iditarod-Nixon Fork fault system to the north. Undivided Kuskokwim Group sedimentary rocks and granite porphyry complexes are the main rock units.

#### Property Geology

Greywacke is dominant in the northern part of the area (“northern resource area” comprising Lewis, Queen, Rochelieu, and Akivik), while shale-rich units are common in the southern part of the area (“southern resource area” comprising South Lewis and ACMA).

Gold deposits are associated with an extensive Late Cretaceous–Early Tertiary gold–arsenic–antimony–mercury hydrothermal system. Gold-bearing zones exhibit strong structural and host rock control along north–northeast-trending fracture zones and are best developed where those zones intersect relatively competent host rocks. Mineralized material is most abundant in intrusive dikes and sills, but sedimentary rocks are also mineralized within strong fracture zones.

#### Geotechnical and Hydrology

A number of geotechnical and hydrological studies have been completed in support of at least pre-feasibility and environmental reports for Donlin Gold.

Rowland Engineering Consultants performed the geotechnical assessments for the engineering to support design of the port site, airstrip, plant site and interconnecting roads. BGC, Inc (“BGC”). performed geotechnical analyses for the design of the pit, waste rock facility (“WRF”), and TSF.

The site-wide surface water and groundwater models developed by BGC, are based on extensive drill data and climatic information for the area. The groundwater model is currently being updated based on the field work completed in 2023. BGC, CEMI, Hatch Ltd., and SRK, Inc. provided hydrologic studies, design criteria and associated test work for the water treatment plant requirements during construction, operations, and closure. Lorax Environmental performed water quality modeling for the post closure pit lake.

#### Exploration Potential

The mineral resource defined in the S-K 1300 Report is confined to a portion of the property. We believe there is considerable potential to increase the mineral resources at the Donlin Gold project. Numerous other targets have been identified along the 8-kilometer mineralized gold trend and are defined by surface sampling and various historical drill holes containing significant gold values.

Exploration potential in the vicinity of the open pit design in the S-K 1300 Report includes extensions along strike to the East ACMA, Lewis, and Crooked Creek areas. Mineralization remains open at depth under the current pit limits. Mineralization also remains open to the north of the planned pit and has been tested by shallow trenching and soil sampling, with limited drilling undertaken to date.

Exploration potential at the Donlin Gold project also exists outside the areas that have been the subject of the mine design in the S-K 1300 Report. Gold mineralization is associated with an overall north–northeasterly-trending high level dike/sill complex that has been outlined in the regional aero-magnetics as a magnetic low. The zone, approximately 8 kilometers long, and 4 kilometers wide, consists of a northern, dike-dominated area, and a southern, more sill-dominated area.

### Mineralization

Southeast-dipping north-northeast-oriented fracture zones are the primary control on gold-bearing vein distribution within the north-northeast mineralized corridors. Composite vein zones or mineralized corridors range up to 30 meters in width and extend for hundreds of meters along strike. Intrusive rocks and to a lesser extent competent massive greywacke are the most favored host rocks, and act as a secondary control on the mineralization. Gold distribution in the deposit closely mimics the intrusive rocks, which contain about 74% of the mineral resource identified in the S-K 1300 Report. Structural zones in competent sedimentary units account for the remaining 26%.

Gold-bearing sulfides occur in both veins and disseminated zones in mafic igneous bodies, rhyodacite dikes and sills, and sedimentary rocks. Quartz-carbonate-sulfide (pyrite, stibnite, and arsenopyrite) veins are the primary mineralized features, but gold also occurs in thin, discontinuous sulfide fracture fillings.

#### Minor Elements and Deleterious Materials

The most abundant minor elements associated with gold-bearing material are iron, arsenic, antimony, and sulfur. They are contained primarily in the mineral suite associated with hydrothermal deposition of gold, including pyrite, arsenopyrite, realgar, native arsenic, and stibnite. Minor hydrothermal pyrrhotite, marcasite and syngenetic or sedimentary pyrite, also account for some of the iron and sulfur.

Three elements that have processing significance are mercury, chlorine, and fluorine. Graphitic carbon and carbonate minerals also would negatively affect the metallurgical process.

### Metallurgy

Sufficient metallurgical test work was completed under the direction of Barrick personnel to support the S-K 1300 Report. Gold is mainly carried by arsenopyrite. Variation is observed in processing behavior between intrusive rocks and sedimentary rocks, but less so between the geographical sources.

Process testing generated development of the following conceptual flowsheet:

- conventional crushing and grinding;
- concentration by flotation;
- pressure oxidation of the concentrate in an autoclave;
- carbon-in-leach (“CIL”) cyanidation of the oxidized concentrate;
- carbon strip and regeneration circuits;
- gold electrowinning; and
- refining and production of doré bars.

This processing concept incorporates proven commercial unit operations.

### Mineral Reserve and Mineral Resource Estimates

The mineral reserves for the Donlin Gold project were classified using criteria appropriate under the mining disclosure definitions and standards of NI 43-101 and S-K 1300 with an effective date of April 27, 2021 and are current as of November 30, 2024. Paul Chilson, P.E., a Qualified Person and an employee of the Company, has reviewed the mineral reserves and mineral resources and material assumptions included in this Annual Report on Form 10-K and confirmed that they remain current as of November 30, 2024. The mineral reserves are summarized in the table below.

*Proven and Probable Mineral Reserve Estimate, Effective Date April 27, 2021 and remain current as of November 30, 2024, based on $1,200 per ounce gold price*

|  | Tonnes (thousands) |  |  | Contained Gold (thousands of ounces) |  |
| --- | ---: | ---: | ---: | ---: | ---: |
| Reserve Category | 100% | Attributable to NOVAGOLD 50% | Gold Grade (grams/tonne) | 100% | Attributable to NOVAGOLD 50% |
| Proven | 7,683 | 3,842 | 2.32 | 573 | 287 |
| Probable | 497,128 | 248,564 | 2.08 | 33,276 | 16,638 |
| Proven and probable | 504,811 | 252,406 | 2.09 | 33,849 | 16,925 |

Notes:

(1) Mineral reserves are reported within the pre-feasibility pit designs, and supported by a mine schedule, featuring variable throughput rates, stockpiling and cut-off optimization. The point of reference for Mineral Reserves estimates is where the reserves are delivered to the mill. The pit designs are contained within an optimized pit shell based on the following economic and technical parameters: Metal price for gold of $1,200 per ounce; reference mining cost of $2.16 per tonne incremented $0.0033 per tonne per meter with depth from the 220 meter elevation (equates to an average mining cost of $2.64 per tonne), fixed processing cost of $13.78/t processed; sustaining capital of $1.54/t processed; general and administrative cost of $3.66/t processed; stockpile rehandle costs of $0.24/t processed assuming that 45% of mill feed is rehandled; variable metallurgical recoveries by rock type, ranging from 86.7% in shale to 94.2% in intrusive rocks in the Akivik domain; refining and freight charges of $1.21/oz Au; royalty considerations of 4.5% NSR and $0.50/t processed; and variable pit slope angles, ranging from 23° to 43°. See “*Section 12: Mineral Reserve Estimates”* of the S-K 1300 Report.

(2) Mineral reserves are reported using an optimized block value (“BV”) based on the following equation: BV = Gold grade \* Recovery – royalties & refining costs – process operating costs – G&A cost reported in $ per tonne processed. Assuming an average gold recovery of 89.5% the marginal gold cut-off grade would be approximately 0.57 grams per tonne, or the gold grade that would equate to a $0.001 BV cut-off at these same values.

(3) The life of mine strip ratio is 5.48:1. The assumed life-of-mine throughput rate is 53,500 tonnes per day.

(4) Rounding may result in apparent summation differences between tonnes, grade and contained metal content.

(5) Mineral reserves are reported on a 100% ownership basis and a 50% ownership basis. The 50% basis is attributable to NOVAGOLD through their 50% ownership interest in the joint venture that owns the mineral rights and manages the Donlin Gold project. Tonnage and grade measurements are in metric units. Contained gold ounces are reported as troy ounces.

Mineral reserves and resources have been estimated using a life-of-mine long-term gold price assumption of $1,200 per ounce. Mineral resources are based on a Whittle™ pit optimized for all measured, indicated, and inferred blocks assuming a gold selling price of $1,200 per ounce. Operating and capital costs are estimated over the life-of-mine.

Mineral resources were classified using criteria appropriate under the mining disclosure standards of S-K 1300 by application of the NSR-based cut-off that incorporated mining and recovery parameters, and constraint of the mineral resources to a pit shell based on commodity prices. The mineral resources (exclusive of mineral reserves) are summarized in the table below.

*Mineral Resources Estimate (exclusive of reserves), Effective Date July 11, 2011 and remain current as of November 30, 2024, based on $1,200 per ounce gold price*

|  | Tonnes (thousands) |  |  | Contained Gold (thousands of ounces) |  |
| --- | ---: | ---: | ---: | ---: | ---: |
| Resource Category | 100% | Attributable to NOVAGOLD 50% | Gold Grade (grams/tonne) | 100% | Attributable to NOVAGOLD 50% |
| Measured | 869 | 435 | 2.23 | 62 | 31 |
| Indicated | 69,402 | 34,701 | 2.44 | 5,435 | 2,718 |
| Measured and indicated | 70,271 | 35,136 | 2.43 | 5,497 | 2,749 |
| Inferred | 92,216 | 46,108 | 2.02 | 5,993 | 2,997 |

Notes:

(1) Mineral resources are reported exclusive of mineral reserves. Mineral resources are reported on a 100% ownership basis and a 50% ownership basis. The 50% basis is attributable to NOVAGOLD through their 50% ownership interest in the joint venture that owns the mineral rights and manages the Donlin Gold project property.

(2) Mineral resources that are not mineral reserves do not have demonstrated economic viability.

(3) The cut-off date for the sample database used in the resource estimate is November 1, 2009. However, more recent drilling data was used to validate the resource model as remaining current.

(4) Mineral resources are reported in-place (point of reference) and contained within a conceptual measured, indicated and inferred optimized pit shell using the following assumptions: gold price of $1,200 per ounce; variable process cost based on 2.1874 \* (sulfur grade) + 10.65; administration cost of $2.29 per tonne processed; refining, freight & marketing (selling costs) of $1.85 per ounce recovered; stockpile re-handle costs of $0.20 per tonne processed assuming that 45% of mill feed is re-handled; variable royalty rate, based on royalty of 4.5% \* (Gold price – selling cost), and a variable metallurgical recovery depending on the host rock type ranging from 86 to 94%. Assuming an average recovery of 89.5% and average sulfur grade of 1.07%, the marginal gold cut-off grade is 0.47 g/t. These technical and economic parameters are those that were used in the 2011 Mining Study to establish reasonable prospects of eventual economic extraction. Based on the QP’s review of the estimate, there would be no material change to the Mineral Resources if a gold price of $1,500/oz was used and other economic parameters were updated to the 2020 parameters used in the Mineral Reserve estimate. Therefore the 2011 Mineral Resource statement is considered current and is presented unchanged. See “*Section 11: Mineral Resource Estimates”* of the S-K 1300 Report.

(5) Rounding may result in apparent summation differences between tonnes, grade and contained metal content.

(6) Tonnage and grade measurements are in metric units. Contained gold ounces are reported as troy ounces.

### Financial model parameters

The estimated mine life is 27 years based on a nominal processing rate of 53,500 tonnes per day. Annual gold production over the projected mine life averages 1.13 million ounces per year, including 1.46 million ounces per year for the first five full years of production. The total initial capital cost estimate is approximately $7,402 million. The project’s estimated after-tax net present value at a 5% discount rate (“NPV 5%”) is $3,040 million using the base case gold price of $1,500 per ounce. The internal rate of return (“IRR”) at the same gold price is 9.2%.

#### Base Case Project Sensitivity to Gold Price

| Gold price ($ per ounce) | After-tax cash flow ($ million) | After-tax NPV 5% ($ million) | After-tax IRR (%) | Payback (years) |
| ---: | ---: | ---: | ---: | ---: |
| 1,200 | 6,556 | 202 | 5.3 | 10.3 |
| 1,300 | 8,773 | 1,161 | 6.8 | 9.2 |
| 1,400 | 10,974 | 2,109 | 8.1 | 8.1 |
| **1,500** | **13,145** | **3,040** | **9.2** | **7.3** |
| 1,600 | 15,308 | 3,967 | 10.4 | 6.7 |
| 1,700 | 17,455 | 4,887 | 11.4 | 6.2 |
| 1,800 | 19,125 | 5,696 | 12.4 | 5.9 |

#### Summary of Key Evaluation Metrics (Base Case at $1,500 per ounce gold)

|  |  |
| --- | ---: |
| Total tonnes mined (million) | 3,270 |
| Ore tonnes treated (million) | 505 |
| Strip ratio (waste tonnes per ore tonne) | 5.5 to 1 |
| Gold ounces recovered (million) | 30.4 |
| Gold recovery (%) | 89.8% |
|  | $ million |
| Net revenue | 45,519 |
| Total operating costs | (19,289) |
| Operating cash flow before tax | 26,230 |
| Income and mining taxes | (3,668) |
| Operating cash flow after tax | 22,562 |
| Initial capital | (7,402) |
| Sustaining capital | (1,723) |
| Closure costs - trust fund | (292) |
| Total costs | (32,374) |
| Net after-tax cash flow | 13,145 |
| Payback period (years) | 7.3 |
| Operation life (years) | 27 |
| After-tax NPV 5% ($ million) | 3,040 |
| After-tax IRR | 9.2% |

#### Operating Cost Estimates1

|  | $ million | $ per tonne processed | $ per tonne mined | $ per gold ounce sold |
| --- | ---: | ---: | ---: | ---: |
| Mine operations | 8,430 | 16.70 | 2.59 | 278 |
| Processing operations | 6,916 | 13.70 | 2.12 | 228 |
| Administration | 1,762 | 3.49 | 0.54 | 58 |
| Land and royalty payments | 2,182 | 4.32 | 0.67 | 72 |
|  | 19,289 | 38.21 | 5.90 | 635 |

Notes:

(1) Column totals may not total correctly due to rounding.

#### Capital Cost Estimates

Initial capital costs are estimated at $7,402 million and sustaining capital costs are estimated at $1,723 million over the LOM.

#### Planned Mining Operations

The Donlin Gold project will be mined by a conventional truck-and-shovel operation. Initial pioneering and pit development will be undertaken to remove overburden, develop mine access roads suitable for large mining equipment, and “face-up” the initial pit for the large shovel and mining equipment.

Primary loading units for both bulk and selective mining in ore and waste will be large electric-hydraulic shovels, with large front-end loaders as secondary units. Large 360 tonne capacity haul trucks will be used for transporting both ore and waste out of the pit.

Blast hole drilling will be performed by medium-sized rotary and down-the-hole hammer drills with various hole diameters depending on bench height and desired mining selectivity. Reverse circulation (“RC”) drilling is planned for detailed geologic definition and grade control.

Support equipment will be used for road, bench, dump maintenance, and miscellaneous projects.

#### Planned Processing Operations

The Donlin Gold project ore will be processed by crushing and grinding, sulfide flotation concentration, concentrate treatment by pressure oxidation (“POX”) in an autoclave, CIL cyanide leaching of the oxidized concentrate, electrowinning, and refining to produce doré bars on site.

Due to gold being associated with sulfide mineralization, primarily arsenopyrite and pyrite, the ore is considered refractory and requires POX pre-treatment to liberate the gold prior to CIL leaching. Sulfide flotation concentration is required prior to POX to concentrate the sulfide content to a level sufficient to fuel the POX operation.

Concentrate is recovered from the primary rougher flotation followed by regrinding of the tailings prior to secondary rougher flotation. The secondary rougher concentrate is processed through a cleaner scavenger circuit producing a concentrate which is combined with the primary rougher concentrate for treatment by POX. The final tailings from the secondary rougher flotation tailings is thickened, and due to their neutralizing potential, is then utilized to modify the pH of the POX discharge solution prior to being transported to the TSF.

The oxidized concentrate from the POX operation would then be cyanide leached in a conventional CIL circuit to produce a pregnant (gold-bearing) solution. Gold from the solution is absorbed onto activated carbon, which is later stripped (gold desorbed from carbon) in an elution circuit. The pregnant solution after elution is fed through electrowinning (“EW”) cells, where cathodes are plated with gold-bearing materials, which are periodically removed, dried in a retort, and melted in an induction furnace to produce doré bars.

Tailings from the CIL circuit would be treated in a cyanide detoxification process using SO2/air technology prior to being recombined with the flotation tailings and transported to the TSF.

Mercury naturally occurs in the Donlin Gold project ores and mercury abatement controls will be installed in six areas of the process facilities including POX, hot cure, EW, retort, refinery furnace, and carbon regeneration kiln. In these control systems, mercury will be collected for off-site shipment and management. Chemicals will be added to tailings to limit the potential for mercury releases from the TSF.

#### Proposed Production Plan and Schedule

Based on the S-K 1300 Report, the operating mine life is estimated to be 27 years with the nominal processing rate of 53,500 tonnes per day. Commercial gold production is expected after a period of approximately 6 years for basic and detailed engineering, and construction. In addition, the Donlin Gold board must approve a construction program and budget before construction of the Donlin Gold project can begin. The timing of the initiation of the required engineering work, of the Donlin Gold board’s approval of a construction program and budget, market conditions, and receipt of all required governmental permits and approvals will determine whether and when construction of the Donlin Gold project will begin.

Preproduction covers the first 15 months of the mine plan, when mining activities will focus on providing sufficient ore exposure for plant start-up. Ore mined during preproduction will be stockpiled and rehandled to the process during operations. Average mine production increases progressively in the initial years until the peak rate of 425,000 tonnes per day is reached in Year 6.

#### Proposed Waste Rock Facility (WRF)

Waste rock from open pit mining will be placed in an ex-pit WRF in the American Creek Valley, east of the pit area, or in a backfill dump in the ACMA pit. The ultimate footprint of the WRF covers an area of approximately 9 square kilometers. Approximately 2,232 million tonnes of waste rock and overburden will be placed in the WRF, and 425 million tonnes will be placed in the ACMA pit backfill dump. Approximately 91 million tonnes of waste rock will be used for construction purposes, and 17 million tonnes of overburden will be stockpiled and used later for reclamation purposes.

The potential magnitude of flow in the American Creek drainage, as well as discharge from springs in the valley floors, warrants the construction of an engineered rock drain system below the waste rock facility, including connecting secondary rock (finger) drains in the smaller contributing drainages.

Waste rock will be characterized by its potential for acid generation and assigned reactivity categories. Non-acid-generating rock will be placed directly in the WRF, along with less reactive potentially acid-generating (“PAG”) rock, PAG5. Some of the more reactive PAG rock, PAG6, will be encapsulated in cells in the WRF to prevent water infiltration through them. The most reactive PAG rock, PAG7, will be backfilled in the ACMA pit beneath the ultimate pit lake water level.

Concurrent reclamation of the waste rock facility will be undertaken during operations.

#### Proposed Tailings Storage Facility (TSF)

The TSF in the Anaconda Creek basin will be a fully lined impoundment with a cross valley dam downstream (“main dam”) in the valley. The tailings dam will be constructed of compacted rock fill using the downstream method with a composite liner on the upstream face. The tailings impoundment footprint will be lined with a linear low-density polyethylene liner over a layer of broadly graded silty sand and gravel acting as low permeability bedding material and providing secondary containment. Material for construction will be sourced from the plant site and fuel farm during initial construction and from the open pit for the later raises during operations.

#### Water Diversion Dams

Water dams are required during the construction period and initial years of operation to protect the lined upstream face of the tailings-starter dam from a significant flood event, to provide a reliable source of fresh water during operation of the process plant, and to minimize runoff into the TSF.

#### Current and Planned On-Site Infrastructure

Current site infrastructure comprises an all-season, soft-sided camp with facilities consisting of kitchen, living quarters, equipment shop, drill shack and other buildings required for support of year-round exploration activities.

There is sufficient area within the project area to host an open pit mining operation, including the proposed open pit, waste rock facility, TSF and process facilities (primary and pebble crushers, coarse ore conveyor and coarse ore stockpile, concentrator, flotation, water treatment plants, POX, oxygen plant, boiler house, utility corridors, leach, refinery, cyanide destruct, and access walkways). Other planned site infrastructure is comprised of access roads, airstrip, accommodation camp, fuel tank farm, dual-fueled power plant, truck shop, truck wash, workshops and vehicle repair facilities, assay laboratory, administration facilities and change rooms. Donlin Gold has secured the surface rights for the areas that may host these facilities.

In nearby villages, Crooked Creek has approximately 105 residents and Aniak has a population of approximately 500. The workforce for the project would be sourced from the local area, from Alaskan regional centers and from other sources as required.

The project is a greenfield site. The on-site infrastructure for the project includes three main development sites in remote locations: the mine and plant site area (including the power plant), the permanent camp, and the airstrip. The plant site, power plant and fuel tank farm will be on a ridge above the proposed TSF. The layout of the plant site was designed to take maximum advantage of the natural topography. The layout also provides for efficient movement of equipment and material products around the site.

#### Planned Off-site Infrastructure

The off-site infrastructure for the project includes three main development sites in remote locations: the Jungjuk port site and mine access road, the natural gas pipeline, and the Bethel port facilities. The Jungjuk port site is situated upriver from Bethel on the Kuskokwim River near the mouth of Jungjuk creek. A port-to-mine access road (Jungjuk road), approximately 48 kilometers long, will traverse varied terrain from the Jungjuk port site to the mine site. A spur road, approximately 4.8 kilometers long, will serve the proposed project airstrip. The primary purpose of the Jungjuk road is to transport freight and diesel from the Jungjuk port site to the mine site, mostly by conventional highway tractors, tankers, and trailers. The natural gas pipeline is described under the “Power” heading below. The proposed Bethel port will be situated near the town of Bethel, a community of approximately 6,080 residents, that is the main existing port on the Kuskokwim River and is an administrative and transportation hub for the 56 villages in the Y-K region. The existing Bethel port is the northernmost medium-draft port in the United States and is served by ocean-going barges. The proposed port would serve as a trans-shipment point from ocean barges to river barges to supply the project during the summer ice-free period.

#### Power

Natural gas will be delivered to site by an approximately 507-kilometer, 356-millimeter diameter pipeline to supply an on-site power generation facility. The S-K 1300 Report contemplates that the electric power for the site will be generated from a dual-fueled (natural gas and diesel), reciprocating engine power plant with a steam turbine utilizing waste heat recovery from the engines. The power plant consists of two equal halves, each consisting of six reciprocating engines, and a separate steam turbine. The total generation facility is nominally rated at 182 MW initially and will increase to 215 MW after four years with the addition of two more generators (one in each half) to allow for N+2 redundancy, thus allowing planned maintenance and predicted outages without cutting back production.

Operating costs are based on importing liquefied natural gas (LNG) by ship to Anchorage and total delivery cost to site which includes regasification of the LNG and delivery from Anchorage to the Donlin Gold project via the pipeline.

The pipeline would commence at the west end of the Beluga Gas Field, approximately 48 kilometers northwest of Anchorage at a tie-in near Beluga located in the Matanuska-Susitna Borough and would run to the mine site. The pipeline would receive booster compression supplied by one compressor station. No additional compression along the pipeline route would be required. The pipeline would have capacity to transport approximately 2 million cubic meters per day of natural gas.

#### Water

Water requirements for the proposed project have been summarized in a Water Resources Management Plan, which has been subject to review by state and federal agencies. Water primarily will be sourced from the two drainages (American and Anaconda Creeks) within the mine footprint and pit dewatering. In some years, the water supply from these sources may not be able to meet the makeup water requirements for the plant. In these circumstances, additional water will be obtained primarily from a proposed reservoir in Snow Gulch.

The source of water supply for the construction camp and, later, the plant site potable water systems is an array of eight deep wells south of Omega Gulch, near Crooked Creek. Water supply will be pumped to freshwater storage tanks and will be treated prior to consumption.

#### Markets

The marketing plan is for the owners of Donlin Gold to take in-kind their respective shares of the gold production, which they can then sell for their own benefit. Under the LLC Agreement, the manager shall give the members prompt notice in advance of the delivery date upon which their respective shares of gold production will be available.

Since there are many available gold purchasers, the members should not be dependent upon the sale of gold to any one customer. Gold can be sold to various gold bullion dealers or smelters on a competitive basis at spot prices.

It is expected that selling contracts for NOVAGOLD’s share of gold production will be typical of, and consistent with, standard industry practice, and be similar to contracts for the supply of doré elsewhere in the world.

#### Taxation

The S-K 1300 Report contemplates that the following taxes may be levied on the project:

- Federal income tax – 21%.
- Alaska state income tax – 9.4% of net income.
- Alaska state mining license tax – 7% of taxable mining income. There is a tax holiday applied for the first 3.5 years from the start of production.

Income tax becomes payable after deductions for capital allowances.

#### Financial results

The total initial capital cost estimate for the Donlin Gold project is approximately $7,402 million. The project’s estimated after-tax NPV at a 5% discount rate is $3,040 million with an IRR after-tax at 9.2% using the base case gold price of $1,500 per ounce. The undiscounted break-even gold price is $930 per ounce and at a 5% discount rate is $1,180 per ounce. In the S-K 1300 Report, the overall economic viability of the project was evaluated by both discounted and undiscounted cash flow analyses, based on the engineering studies and cost estimates discussed in the S-K 1300 Report.

Assumptions in the model comprised:

- Costs prior to project Year 6, the start of basic and detailed engineering, are considered sunk. For discounted cash flow (or NPV) purposes, the model commences in Year 6. Estimates were prepared for all the individual elements of cash revenue and cash expenditures for ongoing operations.
- Estimated cash flows from revenue are based on a gold price of $1,500 per ounce. The pit has been optimized at a gold price of $1,200 per ounce.
- Gold recovery is estimated to average 89.8% over the LOM based on work and testing performed for at least pre-feasibility study purposes.
- Doré refining and shipping charges were estimated at $1.21 per ounce based on escalating to 2020 the actual refining charges for Barrick’s Goldstrike operations and a quotation for transportation and insurance costs from the Donlin Gold project site to a U.S.-based refinery utilized in 2011. In addition, 0.1% of gold produced from the mine is deducted as a cost of refining.
- The current hydrometallurgical process selection renders any contained silver into a greater refractory state, which provides less than 10% silver recovery through standard metal leaching. As a consequence, silver is not included in the Mineral Resource and Mineral Reserve estimates, and no silver credit has been applied to the Donlin Gold project.
- To fund the $1,361 million reclamation and closure costs, the Donlin Gold project provides $412 million at closure by contributing to a Trust Fund commencing in Year -5 and continuing through the end of operations with annual contributions of $7.8 million. In addition to the Trust Fund, financial assurance in the form of letters of credit and/or surety bonds is required to construct and operate the mine. Per the Donlin Gold Project Reclamation Plan Approval from ADNR, financial assurance in the amount of approximately $322 million must be submitted in a form and substance approved by ADNR. The cost to maintain this financial assurance is assumed to be 0.4% of the total assured amount, annually. This equates to approximately $1.3 million per year, paid from the start of construction through the end of operations.
- No salvage is assumed at the end of operations.

#### Current Activities

For information on current activities, see section *Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations*, below.

### Change in Mineral Resources and Reserves from 2023 to 2024

There were no changes in reported mineral resources and reserves reported for the years ended November 30, 2024 and 2023. Paul Chilson, P.E., a Qualified Person and an employee of the Company, has reviewed the mineral reserves and mineral resources and material assumptions included in this Annual Report on Form 10-K and confirmed that they remain current as of November 30, 2024.

### Mineral Resource and Reserve Internal Controls

The Company has internal controls for reviewing and documenting the information supporting the mineral resource and mineral reserve estimates, describing the methods used, and ensuring the validity of the estimates. These internal control processes were not materially impacted by the adoption of S-K 1300 in 2021. Information that is used in the mineral resource and mineral reserve estimation process was reviewed and approved by appropriate qualified persons that prepared the content of the NI 43-101 and S-K 1300 reports for the Donlin Gold project. The mineral resources and mineral reserves are subject to our internal review process on an annual basis, which includes review by NOVAGOLD’s Qualified Person based in our corporate office in Salt Lake City, Utah, USA.

Sample collection, preparation, analysis and security for all Donlin Gold core drill programs are in line with industry-standard methods for gold deposits.

- Drill programs included insertion of blank, duplicate and SRM samples.
- Quality Assurance/Quality Control program results do not indicate any problems with the analytical programs.
- Data is subject to validation, which includes checks on surveys, collar coordinates, lithology data, and assay data. The checks are appropriate, and consistent with industry standards.
- Independent data audits have been conducted and indicate that the sample collection and database entry procedures are acceptable.
- All core has been catalogued and stored in designated areas.

Mineral resources and mineral reserves are estimates that are imprecise and depend upon geologic interpretation and statistical inferences drawn from drilling and sampling analysis, which may prove to be unreliable. See *Risk Factors – “The quantities for our mineral resources and mineral reserves are estimates based on interpretation and assumptions and may yield less mineral production under actual conditions than is currently estimated.”*

## Legal proceedings

As filed, 653 characters.

Periodically, we are a party to or otherwise involved in legal proceedings arising in the normal course of business. Management does not believe that there is any pending or threatened proceeding against the Company which, if determined adversely, would have a material adverse effect on our financial position, liquidity or results of operations. There are no material proceedings pursuant to which any of our directors, officers or affiliates or any owner of record or beneficial owner of more than 5% of our securities or any associate of any such director, officer or securityholder is a party adverse to us or has a material interest adverse to us.

## Management's discussion and analysis

As filed, 27,902 characters.

The following Management’s Discussion and Analysis (“MD&A”) provides information that management believes is relevant to an assessment and understanding of the consolidated financial condition and results of operations of NOVAGOLD RESOURCES INC., incorporated in British Columbia, Canada, and its subsidiaries (collectively, “NOVAGOLD,” the “Company,” “our” and “we”). This item should be read in conjunction with our Consolidated Financial Statements and the notes thereto included in this annual report.

The following MD&A generally discusses our consolidated financial condition and results of operations for 2024 and year-over-year comparisons between 2024 and 2023. Discussions of our consolidated financial condition and results of operations for 2023 and year-over-year comparisons between 2023 and 2022 are included in Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, in the Company’s Annual Report on Form 10-K for the fiscal year ended November 30, 2023, filed with the Securities and Exchange Commission on January 24, 2024, are incorporated by reference into this MD&A.

### Overview

We operate in the gold mining industry, primarily focused on advancing the Donlin Gold project in Alaska. The Donlin Gold project is held by Donlin Gold LLC (“Donlin Gold”), a limited liability company owned equally by wholly-owned subsidiaries of NOVAGOLD and Barrick. We record our interest in the Donlin Gold project as an equity investment, which results in our 50% share of Donlin Gold’s expenses being recorded in the income statement as an operating loss. The investment amount recorded on the balance sheet primarily represents unused funds advanced to Donlin Gold.

Our corporate goals include continuing to advance the Donlin Gold project toward a construction decision; maintaining support for Donlin Gold among the project’s stakeholders; promoting a strong safety, sustainability, and environmental culture; maintaining a favorable reputation of NOVAGOLD; and preserving a healthy balance sheet. Our operations primarily relate to the delivery of project milestones, including the achievement of various technical, environmental, sustainable development, economic and legal objectives, obtaining necessary permits, completion of feasibility studies, preparation of engineering designs and the financing to fund these objectives.

### Donlin Gold project

Donlin Gold advanced key activities in 2024 to position the project to update technical work and cost estimates. Principal activities included the substantial completion of metallurgical test work at a pilot plant in Ontario, Canada to confirm proposed optimizations to the flowsheet, field and geochemical data collection to continue updating source characteristics for groundwater and surface water models for both operational and closure planning, as well as advancement of the Donlin Gold resource model. Results derived from the considerable technical work performed over these past twelve months will serve as inputs into updated feasibility work.

The Donlin Gold board must approve an updated feasibility study, construction program and budget before the Donlin Gold project can be developed. The timing of the required engineering work and the Donlin Gold board’s approval of an updated feasibility study, construction program and budget, the receipt of all required governmental permits and approvals, and the availability of financing, commodity price fluctuations, risks related to market events and general economic conditions among other factors, will affect the timing of and whether to develop the Donlin Gold project. Among other reasons, project delays could occur due to public opposition, litigation challenging permit decisions, requests for additional information or analysis, limitations in agency staff resources during regulatory review and permitting, or project changes made by Donlin Gold.

#### Stakeholder and government engagement

In collaboration with Calista and TKC, Donlin Gold actively engages stakeholders and governments in the Y-K region, Alaska and Washington, D.C. The project’s location on private lands selected under the 1971 Alaska Native Claims Settlement Act is a significant feature, setting it apart from most other mining assets in Alaska and guiding our outreach efforts. Donlin Gold’s enduring partnerships with Calista and TKC are pivotal in facilitating comprehensive outreach throughout the Y-K region.

Our outreach in Alaska, particularly in the Y-K region, and in Washington, D.C., has strengthened community engagement and reinforces the project’s social license. The Company appreciates the diligent contributions of the Donlin Gold team, partners, and stakeholders, and remains dedicated to developing the project to its full potential. In collaboration with Calista and TKC, the mineral and surface rights holders, Donlin Gold LLC has made significant strides in local community and government engagement across the Y-K region, Alaska, and Washington, D.C., including advancing the project’s development and permitting efforts. Over decades, our commitment to engaging with the 62 stakeholder communities in the Y-K region has built meaningful relationships, enhanced investment, and reinforced our social license. This longstanding dedication underscores the approach of the Donlin Gold project and its partners, Calista and TKC, to foster robust relationships with both local communities and governmental entities built on trust, transparency, respect and partnership.

To that end, Donlin Gold led numerous projects and activities in 2024. Calista, TKC, and Donlin Gold hosted public Open Houses in Anchorage, Bethel, and Crooked Creek providing Alaskans and local residents with the opportunity to learn more about the project and to engage in open and transparent discussions. Donlin Gold hosted a project site tour for a group of residents from Crooked Creek and Georgetown which are the project’s closest neighboring villages.

NOVAGOLD remains committed to stakeholder engagement and community development working closely with Tribal communities and Alaska Native Corporations to identify needs and collaboratively develop solutions that enhance and uplift communities, fostering sustainable growth and shared prosperity for future generations. To that end, NOVAGOLD representatives were on the ground in Alaska providing extensive support to the Donlin Gold team in their outreach efforts. Donlin Gold established three additional Shared Values Statements for a total of 18, which formalize Donlin Gold’s ongoing engagement with local communities, reinforce existing long-term relationships, and address specific community needs. In 2024, over 12,000 direct engagements were conducted with key stakeholders.

Donlin Gold, Calista, and TKC held two Subsistence Community Advisory Committee ("SCAC") meetings in 2024, the first in Aniak and second in Anchorage. This committee, which is composed of people from the Y-K region, reflects the ongoing commitment to establishing a structured process for communication, dialogue, problem-solving, and gathering input from the broader community on subsistence matters throughout the life of the project. The SCAC committee provides a forum for sharing information, questions and ideas from the communities in the Y-K region with Donlin Gold, Calista and TKC, as well as bringing information about the project back to their respective communities.

#### Environment and social investments

Recognizing the importance of ecological stewardship in the Y-K region, since mid-2023, Donlin Gold has intensified efforts with our Alaska Native Corporation partners to monitor, survey and engage in the dialogue on salmon fisheries in the Kuskokwim and Yukon River watersheds. In 2024, Donlin Gold launched a salmon smolt monitoring program on the George River, a tributary of the Kuskokwim River, in partnership with the Native Village of Napaimute to assess smolt health and migration patterns — an initiative that will continue into 2025. Restoration of a portion of the historic Lyman placer site, which included significant stream and pond habitat creation, including aquatic life access and use, was completed in 2024. Aquatic restoration work on a reach of Snow Gulch previously disturbed by historic mining will start in 2025.

In addition, Donlin Gold’s “In It for The Long Haul” Backhaul Program, a long-standing initiative to collect and safely dispose of hazardous household electronic waste, including appliances, from Y-K villages, recycled approximately 140,000 pounds of material in 2024, for an impressive total of approximately 803,000 pounds of hazardous materials removed from the Y-K region since the program began in 2018.

Donlin Gold’s partnership with the Crooked Creek Traditional Council has supported the Summer Youth Employment program, providing local youth with hands-on experience in various work environments while also assisting Elders. The Donlin Gold project continued sponsoring the RurAL CAP Elder Mentor Program, which connects youth with Elders to foster intergenerational knowledge and support academic engagement and school readiness across the State. Donlin Gold also shipped dictionaries to all school districts in the Y-K region for third graders as part of The Dictionary Project, a national effort to promote literacy and creative thinkers, a project they have participated in annually since 2012.

Donlin Gold has also reaffirmed its commitment to the Alaska School Activities Association, supporting high school-level athletic, academic, and fine arts programs statewide. Donlin Gold’s ongoing financial contributions highlight our steadfast dedication to enhancing educational and extracurricular opportunities for students throughout Alaska.

#### Permitting

The preliminary design packages for Dam Safety Certification were submitted to the ADNR in 2024. Comments from the ADNR on the Dam Safety Certification preliminary design packages are anticipated in 2025 with potential issuance of the Certification in 2026/2027.

The Alaska Pollutant Discharge Elimination System permit, which was originally set to expire in 2023, as well as the Waste Management Permit, which was set to expire in January 2024, are administratively extended by the Alaska Department of Environmental Conservation until renewed. The Reclamation Plan, which was also set to expire in 2024, is administratively extended until 2027.

Donlin Gold applied for and received an 18-month extension of the construction deadline on its air quality permit through July 2026.

In September 2022, thirteen tribes sent letters to the Corps and the EPA. The letter to the Corps requests that it consider requiring an EIS on the Donlin Gold project and revoke the Clean Water Act Section 404 permit (the “404 permit”) in light of what the tribes consider “new information” since the final EIS was issued in 2018. Additionally, the EPA letter requested that it initiate a Clean Water Act Section 404(c) veto process for the Donlin Gold project. In early January 2023, Donlin Gold and Calista both submitted responses to the Corps on why the requests to prepare a supplemental EIS or revoke the 404 permit should not be granted. In January 2023, Donlin Gold also provided a response to the EPA describing why the agency should not initiate a 404(c) process. To date, neither the Corps nor EPA has responded to the tribes’ letters.

#### Litigation

On June 28, 2021, Earthjustice representing Orutsararmiut Native Council (“ONC”) filed an appeal of the ADEC Commissioner’s decision upholding the ADEC’s Clean Water Act Section 401 water quality certification in Alaska Superior Court. In December 2021, at the request of the State of Alaska and Donlin Gold, the Alaska Superior Court suspended the case and remanded it to ADEC to allow for consideration of additional technical materials on mercury and temperature. After an administrative process, the Commissioner reaffirmed ADEC’s issuance of the 401 Certification on August 18, 2023. The suspension of the previously filed Alaska Superior Court case was then lifted and Earthjustice filed its opening brief with the Alaska Superior Court in January 2024. Briefing is complete and oral arguments were held on August 30, 2024. A decision is anticipated from the Alaska Superior Court in 2025.

On September 20, 2021, Earthjustice, representing ONC, Cook Inletkeeper, and three Y-K villages, filed an appeal of the State pipeline ROW authorization in Alaska Superior Court. On April 12, 2023, the Alaska Superior Court affirmed ADNR’s issuance of the ROW lease in the Earthjustice case. Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. On May 25, 2022, Earthjustice, representing ONC and five Y-K villages, filed an appeal of ADNR’s issuance of certain water rights permits to Donlin Gold in Alaska Superior Court. After briefing and oral argument, on September 1, 2023, the Alaska Superior Court affirmed ADNR’s decision on Donlin Gold’s water rights permits. On October 2, 2023, Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. Earthjustice’s opening brief was submitted to the Alaska Supreme Court on January 4, 2024. Response briefs from the State of Alaska and Donlin Gold were completed in April 2024, and Earthjustice subsequently filed their reply brief in May 2024. Briefing on Earthjustice’s appeal of the Alaska Superior Court affirmation of ADNR’s issuance of the State pipeline ROW lease to the Alaska Supreme Court was completed in February 2024. Oral arguments for both the water rights permits and the State pipeline ROW were held November 12, 2024, and a decision is anticipated in 2025.

On April 5, 2023, Earthjustice representing ONC and six Y-K villages filed suit against the U.S. government in Anchorage Federal District Court (the “Federal District Court”) asking the Federal District Court to invalidate the Donlin Gold Joint Record of Decision, which included the U.S. Army Corps’ of Engineers’ issuance of the 404 permit and the Department of Interior, Bureau of Land Management’s issuance of the ROW lease for the portions of the pipeline on Federal lands. The U.S. Department of Justice (“DOJ”) is defending the issuance of the permits by those Federal agencies. The State of Alaska, Donlin Gold, and Calista were granted intervenor status in this case. The DOJ filed their brief supporting the issuance of the JROD and the sufficiency of the environmental analysis in the Final Environmental Impact Statement on April 2, 2024. Amicus briefs supporting the project were filed by the village of Crooked Creek and the Alaska federal Congressional delegation. Oral arguments were held on June 24, 2024, and the Federal District Court issued a decision on September 30, 2024. The decision rejected the plaintiffs’ arguments on two of the three issues raised in the litigation but agreed with plaintiffs that the federal agencies took too narrow of a view in analyzing the impact of a theoretical release from the TSF. The Federal District Court requested supplemental briefing on the appropriate remedy for addressing this issue. On October 7, 2024, the plaintiffs filed a request for reconsideration on one of the issues on which the Federal District Court had ruled against the plaintiffs and, at DOJ’s request, the Federal District Court suspended the schedule for briefing on the appropriate remedy until after the Federal District Court ruled on plaintiffs’ motion for reconsideration. On December 23, 2024, the Federal District Court denied plaintiffs’ request for reconsideration. The Court reestablished the remedy briefing schedule with initial briefs from all parties now due on January 31, 2025, and response briefs from all parties due on February 14, 2025.

To date, all permits and approvals granted to Donlin Gold by federal and state agencies remain issued and in place while the legal challenges described above proceed. We recognize the importance of preparedness and organization in these matters. With the unwavering support of Donlin Gold and its owners, we will continue to back the state and federal agencies in defending their thorough and diligent permitting processes and are committed to working with the federal agencies and all stakeholders on an appropriate remedy to address the Federal District Court’s decision.

### Other remediation

During 2024, $157 in remediation expenditures were incurred for fieldwork at the historic former New Gold House property in Nome, Alaska, including re-seeding. Monitoring, sampling and maintenance work (as needed, based on monitoring results) is planned for the 2025 field season.

### Consolidated Financial Results

The details of our *Net loss* are set forth below:

|  | Years ended November 30, 2024 | 2023 | Change |
| --- | ---: | ---: | ---: |
| Net loss | $(45,621) | $(46,803) | $(1,182) |
| Net loss per common share, basic and diluted | $(0.14) | $(0.14) | $0.00 |

*Net loss* decreased by $1,182 from 2023, primarily due to lower field expenses at Donlin Gold, partially offset by higher corporate general and administrative expenses, increased interest expense on the promissory note, lower interest income on cash and term deposits and other income related to a gain in the fair market value of marketable securities and proceeds received for the 2021 sale of the Company’s interest in the San Roque mineral property. Donlin Gold expenses were lower with reduced site activity in 2024, compared to fieldwork and geotechnical drilling for the Alaska Dam Safety certificates and hydrological drilling to support mine planning and design in 2023. General and administrative costs increased primarily due to higher professional fees and employee compensation partially offset by lower stock-based compensation expense related to forfeiture of options and performance share units due to the departure of certain former employees.

Professional fees increased due to consulting fees primarily related to ongoing efforts to enhance the value of the Donlin Gold project by evaluating alternatives to further advance the project. Salaries and benefits increased primarily due to hiring of additional staff. Income tax expense relates to passive income taxable in Canada on a portion of interest income earned by U.S. subsidiaries, and for withholding taxes on the sale proceeds received during the first quarter of 2024 related to the 2021 sale of the Company’s interest in the San Roque mineral property in Argentina.

### Liquidity and Capital Resources

#### Liquidity overview

With total cash and term deposits of $101,224, the Company has sufficient working capital available to cover anticipated funding of the Donlin Gold project and corporate general and administrative costs for at least the next two years at current spending levels. Additional capital may be required to complete an updated Donlin Gold feasibility study. Considerable additional capital will be required if a decision to commence engineering and construction is reached by Donlin Gold. Future financing to fund construction is anticipated through debt and equity offerings, project specific debt, and/or other means. Our continued operations are dependent on our ability to obtain additional funding or to generate future cash flows. However, there is no assurance that we will be successful in our efforts to raise additional capital on terms favorable to us, or at all. For further information, see section *Item 1A, Risk Factors – Our ability to continue the exploration, permitting, development, and construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing.*

Our anticipated expenditures in fiscal year 2025 are approximately $37,500, including $21,500 to fund the Donlin Gold project, and $16,000 for corporate general and administrative costs.

Our financial position includes the following as of November 30, 2024:

- Cash and cash equivalents of $42,224, primarily held at three large Canadian chartered banks with investment grade credit ratings.
- Term deposits of $59,000 held at two large Canadian chartered banks with investment grade credit ratings with maturities of less than one year.
- Promissory note payable to Barrick of $151,522, including accrued interest at U.S. prime plus 2%, compounded semi-annually. The promissory note and accrued interest are payable from 85% of the Company’s share of revenue from future Donlin Gold project production or from any net proceeds resulting from a reduction of the Company’s interest in Donlin Gold. At the current interest rate of 9.5%, interest on the note in fiscal year 2025 will total approximately $14,942.

#### Cash flows

In 2024, cash and cash equivalents decreased by $3,525, mainly to fund our share of Donlin Gold, corporate administrative expenses partially offset by a net reduction of term deposits held.

Spending on operating activities in 2024 increased by $4,856 compared to the prior year primarily due to increased corporate general and administrative expenses, lower interest income on cash and term deposits and higher income tax withholding related to passive income taxable in Canada on a portion of interest income earned by U.S. subsidiaries. Cash provided from investing activities in 2024 increased by $19,683 compared to the prior year primarily due to a net reduction of term deposits held in 2024 and lower Donlin Gold funding requirements. Financing activities reflect $174 of withholding tax on PSUs (as defined below) that vested at 100% during the year and settled with the issuance of net common shares. The PSU awards that matured and vested in December 2024 at 25% of the grant amount were also settled with the issuance of net common shares.

### Outstanding share data

As of January 13, 2025, the Company had 334,646,571 common shares issued and outstanding. Also, as of January 13, 2025, the Company had: i) a total of 8,838,001 stock options outstanding; 7,816,967 of those stock options with a weighted-average exercise price of $6.21 and the remaining 1,021,034 with a weighted-average exercise price of C$7.62; and ii) 1,225,100 performance shares units (“PSUs”) and 284,378 deferred share units (“DSUs”) outstanding. Upon exercise of the foregoing convertible securities, the Company would be required to issue a maximum of 10,960,029 common shares.

### Related party transactions

As of November 30, 2024, the Company has accounts receivable from Donlin Gold of $212 (November 30, 2023: $203) included in *Other current assets* for third party study costs contracted for by the Company on behalf of Donlin Gold.

### Fourth quarter results

During the fourth quarter of 2024 we incurred a net loss of $10,860 compared to a net loss of $10,421 in the fourth quarter of 2023. The increase in net loss primarily resulted from higher corporate general and administrative expenses, increased interest on the promissory note, lower interest income, partially offset by reduced activity at Donlin Gold.

### Critical Accounting Policies

We believe the following accounting policies are critical to our financial statements due to the degree of uncertainty regarding the judgements or assumptions involved and/or the magnitude of the asset, liability, or expense being reported.

#### Contingent note receivable

A portion of the proceeds on the sale of the Company’s 50% interest in the Galore Creek project to Newmont, included a contingent note for $75,000 receivable upon the approval of a Galore Creek project construction plan by the owner(s). The Company has assigned no value to the contingent note receivable as management determined that approval of Galore Creek project construction was not probable as of the closing of the Galore Creek sale, and management’s assessment did not change as of November 30, 2024. The contingent note will be recognized only when, in management’s judgement, payment is probable, and the amount recorded will not reverse in future periods.

#### Investment in affiliates

Investments in unconsolidated ventures over which the Company can exercise significant influence, but does not control, are accounted for under the equity method and include the Company’s investment in the Donlin Gold project. Donlin Gold LLC is a non-publicly traded equity investee holding the Donlin Gold project. We identified Donlin Gold as a Variable Interest Entity (“VIE”) as the entity is dependent on funding from its owners. All funding, ownership, voting rights and power to exercise control is shared equally on a 50/50 basis between the owners of the VIE. Therefore, the Company has determined that it is not the primary beneficiary of the VIE.

The Company’s maximum exposure to loss is its investment in Donlin Gold of $2,597 as of November 30, 2024. The Company reviews and evaluates its investment in the Donlin Gold project for other than temporary impairment when events or changes in circumstances indicate that the related carrying amounts may not be recoverable. Events that could indicate impairment of an investment in an affiliate include a significant decrease in long-term expected gold price, a significant increase in expected operating or capital costs, unfavorable exploration results or technical studies, a significant decrease in reserves, a loss of significant mineral claims, or a change in the development plan or strategy for the project. Management reviewed potential impairment indicators and determined that there were none as of November 30, 2024.

#### Share-based compensation

We grant share-based compensation awards in exchange for employee services, including a stock option plan and a PSU plan. The fair value of awards granted under the plans are recognized in the *Consolidated Statements of Loss* over the related service period. The fair values of stock options are estimated at the time of each grant using a Black‐Scholes option pricing model, and the fair values of PSUs are measured at each grant date using a Monte Carlo valuation model. The fair value estimates may be impacted by certain variables including, but not limited to, stock price volatility, employee stock option exercise behaviors, additional stock option and PSU grants, estimates of forfeitures, the Company’s performance, and the Company’s performance in relation to its peers.

We grant members of the Board DSUs whereby each DSU entitles the directors to receive one common share of the Company or the market value thereof in cash, at the Company’s option, when they retire from service with the Company. The fair value of the DSUs is measured at the date of the grant in amounts ranging from 50% to 100% of directors’ annual retainers at the election of the directors. The fair value is recognized in the *Consolidated Statements of Loss* over the related service period.

In 2024, we incurred $7,237 in share-based compensation costs, a decrease of $1,494 over the prior year primarily due to the forfeiture of options and performance share units following the departure of the former Chief Financial Officer and other personnel during the year.

During 2024, we had 149,000 PSU awards that vested at 100% and 47,000 DSU awards that vested and were settled with the issuance of common shares. As of November 30, 2024, we had $2,348 of unrecognized compensation cost related to 4,361,486 non-vested stock options expected to be expensed and vest over a period of approximately two years. Also, as of November 30, 2024, we had 1,633,500 non-vested PSU awards outstanding of which 408,400 were fully expensed and vested in December 2024 at 25% of the grant amount, which were subsequently settled with the issuance of common shares. The remaining 1,225,100 non-vested PSU awards with $3,715\] of unrecognized compensation cost will be expensed over a period of approximately two years.

## Market risk

As filed, 997 characters.

Our financial instruments are exposed to certain financial risks, including credit and interest rate risks.

#### Credit risk

Concentration of credit risk exists with respect to our cash and cash equivalents, and term deposit investments. All term deposits are held at two Canadian chartered banks with investment grade credit ratings and have maturities of less than one year.

#### Interest rate risk

The interest rate on the promissory note owed to Barrick is variable with the U.S. prime rate. Based on the amount owing on the promissory note as of November 30, 2024, and assuming all other variables remain constant, a 1% change in the U.S. prime rate would result in an increase/decrease of approximately $1.5 million in the interest accrued on the promissory note per annum. The promissory note and accrued interest are payable from 85% of the Company’s share of revenue from future mine production or from any net proceeds resulting from a reduction of the Company’s interest in Donlin Gold.

## Controls and procedures

As filed, 3,117 characters.

An evaluation was performed under the supervision and with the participation of our management, including our principal executive officer and principal financial officer, of the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e)) under the Exchange Act, as of the end of the period covered by this Annual Report on Form 10-K. Based on the foregoing, our management concluded that our disclosure controls and procedures are effective to ensure that information required to be disclosed by us in reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC rules and forms, and such information is accumulated and communicated to our management, including our principal executive officer and principal financial officer, to allow timely decisions regarding required disclosure.

There was no change in our internal control over financial reporting that occurred during the year ended November 30, 2024 that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

### REPORT OF MANAGEMENT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

Our management is responsible for establishing and maintaining adequate internal control over financial reporting for the Company. Internal control over financial reporting is a process to provide reasonable assurance regarding the reliability of our financial reporting and the preparation of financial statements for external purposes in accordance with accounting principles generally accepted in the United States. Internal control over financial reporting includes maintaining records that in reasonable detail accurately and fairly reflect our transactions; providing reasonable assurance that transactions are recorded as necessary for preparation of our financial statements; providing reasonable assurance that receipts and expenditures of our assets are made in accordance with management’s authorization; and providing reasonable assurance that unauthorized acquisition, use or disposition of our assets that could have a material effect on the financial statements would be prevented or detected on a timely basis. Because of its inherent limitations, internal control over financial reporting is not intended to provide absolute assurance that a misstatement of our financial statements would be prevented or detected.

Management conducted its evaluation of the effectiveness of our internal controls over financial reporting based on criteria established in *Internal Control-Integrated Framework* (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this evaluation, management concluded that our internal control over financial reporting was effective as of November 30, 2024.

The effectiveness of our assessment of internal control over financial reporting as of November 30, 2024 has been audited by PricewaterhouseCoopers LLP, an independent registered public accounting firm, as stated in their report which appears herein.

Filed Jan 23, 2025.
Source: SEC EDGAR, the filing index for accession 0001171843-25-000387. Last ingested by Listed: Nov 11, 2026, 03:11 ET. No prices; not investment advice.