# Energy Services of America CORP: Form 10-K for the period ended Sep 30, 2013

- Company: [Energy Services of America CORP](/companies/esoa.md) (CIK 1357971)
- Form: 10-K
- Filed: 2013-12-20
- Accepted by EDGAR: Dec 20, 2013, 10:54 ET
- Period: 2013-09-30
- Accession: 0001188112-13-003589
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1357971/000118811213003589/t77962_10k.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1357971/000118811213003589/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2013-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2013-07-01 to 2013-09-30 | $30.3m | us-gaap:SalesRevenueNet |
| Revenue | 12 months, 2012-10-01 to 2013-09-30 | $108.8m | us-gaap:SalesRevenueNet |
| Cost of revenue | 12 months, 2012-10-01 to 2013-09-30 | $98.8m | us-gaap:CostOfRevenue |
| Gross profit | 12 months, 2012-10-01 to 2013-09-30 | $10.0m | us-gaap:GrossProfit |
| Selling, general and administrative | 12 months, 2012-10-01 to 2013-09-30 | $8.0m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months, 2013-07-01 to 2013-09-30 | $1.3m | us-gaap:OperatingIncomeLoss |
| Operating income | 12 months, 2012-10-01 to 2013-09-30 | $2.0m | us-gaap:OperatingIncomeLoss |
| Interest expense | 12 months, 2012-10-01 to 2013-09-30 | $1.7m | us-gaap:InterestExpense |
| Income tax | 12 months, 2012-10-01 to 2013-09-30 | −$1.3m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2013-07-01 to 2013-09-30 | $2.4m | us-gaap:NetIncomeLoss |
| Net income | 12 months, 2012-10-01 to 2013-09-30 | $3.6m | us-gaap:NetIncomeLoss |
| Diluted EPS | 12 months, 2012-10-01 to 2013-09-30 | $0.24 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 12 months, 2012-10-01 to 2013-09-30 | $0.25 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 12 months, 2012-10-01 to 2013-09-30 | 14,923,255 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 12 months, 2012-10-01 to 2013-09-30 | $6.1m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 12 months, 2012-10-01 to 2013-09-30 | $902.2k | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Share repurchases | 12 months, 2012-10-01 to 2013-09-30 | $30 | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2013-09-30 | $6.2m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2013-09-30 | $40.9m | us-gaap:AssetsCurrent |
| Total assets | at 2013-09-30 | $50.7m | us-gaap:Assets |
| Current liabilities | at 2013-09-30 | $30.7m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2013-09-30 | $35.8m | us-gaap:Liabilities |
| Long-term debt | at 2013-09-30 | $1.1m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2013-09-30 | $5.3m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2013-09-30 | $14.9m | us-gaap:StockholdersEquity |

## Business

As filed, 23,704 characters.

### Overview

Until August 15, 2008, Energy Services of America (ESA) operated as a blank check company. On August 15, 2008, the Company completed the acquisitions of S.T. Pipeline, Inc. and C.J. Hughes Construction Company, Inc. Each of S.T. Pipeline and C.J. Hughes are held as separate subsidiaries of ESA.

Energy Services is a provider of contracting services to America’s energy providers, primarily the gas and electricity providers. The Company’s services include:

- The installation, replacement and repairs of pipelines for the oil and natural gas industries.
- General electrical services for both power companies and various other industrial applications.
- The installation of water and sewer lines for various governmental agencies.
- Various other ancillary services related to the other services.

The Company’s consolidated revenues for the year ended September 30, 2013 were $110.9 million, of which 53% was attributable to gas work, 37% to electrical services, and 10% to water and sewer installations and other ancillary services. Our consolidated revenues for the year ended September 30, 2012 were $157.7 million, of which 72% was attributable to gas work, 19% to electrical services, and 9% to water and sewer installations and other ancillary services.

Energy Services operates primarily in the Mid-Atlantic region of the United States. The work includes a combination of both interstate and intrastate pipelines that move natural gas from the producing regions to consumption regions. The Company does not own or is not directly involved in the exploration, transportation or refinement of oil and natural gas nor any of the facilities used for transporting electricity. The Company has established relationships with numerous customers, which include many of the leading companies in the industries we serve.

Representative Customer list:

Spectra Energy

Dominion Resources

Columbia Gas Transmission

Columbia Gas of Ohio and Pennsylvania

Nisource

Marathon Ashland Petroleum LLC

American Electric Power

Toyota

Hitachi

Kentucky American Water

Equitable Resources

Markwest Energy

Range Resources

Various State, county and municipal public service districts.

Energy Services’ sales force consists of industry professionals with significant relevant sales experience, who utilize industry contacts and available public data to determine how to most appropriately market ESA’s line of products. We rely on direct contact between our sales force and our customers’ engineering and contracting departments in order to obtain new business. Due to the occurrence of inclement weather during the winter months, certain parts of the Company business, i.e., the construction of pipelines, is somewhat seasonal in that most of the work is performed during the non-winter months.

C.J. Hughes Construction Company, Inc. (C.J. Hughes) is a general contractor primarily engaged in pipeline construction for utility companies. C.J. Hughes operates primarily in the mid-Atlantic region of the United States. Nitro Electric Company, Inc., a wholly owned subsidiary of C. J. Hughes, is involved in electrical contracting providing its services to the power and refining industries. Nitro Electric operates primarily in the mid-Atlantic region of the United States. Contractors Rental Corporation, Inc. a wholly owned subsidiary of C.J. Hughes is involved in main line pipeline installation and repairs in the mid-Atlantic region of the country as well. All of the C.J. Hughes, Nitro Electric, and Contractors Rental production personnel are union members of various related construction trade unions and are subject to collective bargaining agreements that expire at varying time intervals.

S.T. Pipeline, Inc. (S.T.) was incorporated in May 1990 under the laws of the State of West Virginia. S.T. engaged in the construction of natural gas pipelines for utility companies in various states, mostly in the mid-Atlantic area of the country. The financial position and results of operations of S.T. Pipeline, Inc. have been presented as discontinued operations in the accompanying financial statements for all presented periods. On May 14, 2013, the Company liquidated the operation of S.T. and realized $1.9 million from the sale.

A goodwill impairment charge was recorded in the fourth fiscal quarter of 2012 in the amount of $36.9 million, representing all of the goodwill on our balance sheet. Based on our continued operating losses and management’s forecasts of future cash flows our goodwill impairment test indicated that the goodwill of the Company had no value. See Note 4 of the Consolidated Financial Statements.

In connection with their audit of our 2013 financial statements, Arnett Foster Toothman, our independent public auditing firm as part of its audit report on our financial statements expressed substantial doubt about the ability of the Company to continue as a “going concern”. The financial difficulties giving rise to Arnett Foster Toothman’s conclusion include the significant and sustained losses that the Company has incurred over recent years as well as our inability to secure loans and lines of credit to fund our business in a manner deemed adequate to conduct our business. Although pursuant to the terms of the Forbearance Agreement we are exploring all avenues to return to profitability, there can be no assurance that we will be able to successfully resolve the factors that gave rise to Arnett Foster Toothman’s decision to render its “going concern” opinion.

On September 28, 2011, we completed an exchange offer pursuant to which we exchanged 8 ½ warrants for one share of common stock. Following the completion of the exchange offer any warrants which were not exchanged expired on October 12, 2011. On November 14, 2011, we delisted from the NYSE AMEX the warrants and units. Following the completion of the exchange offer and expiration of the warrants that were not tendered, we had 14,446,836 shares of common stock issued and outstanding and no warrants or units outstanding.

The Company’s stock trades under the symbol “ESOA” and transactions in the stock are reported on the Over-the-Counter market.

On November 28, 2012, the Company entered into a Forbearance Agreement with our lender related to our revolving line of credit and term debt as reported in the Company’s November 29, 2012 Form 8-K filing. The Forbearance Agreement, among other things, required the Company to close the S. T. Pipeline subsidiary and dispose of its assets. The Company was also required to prepare recommendations relating to the on-going operations of Nitro Electric Company, Inc, C.J. Hughes Construction Company, and Contractors Rental Corporation, including refinancing, sale or liquidation of the companies by May 31, 2013. Under the terms of the agreement we cannot make additional draws on the revolving line of credit. Although the Company can request the establishment of a forbearance line of credit, the lender is under no obligation to approve it. The limitations on our working capital could have a severe impact on our ability to obtain and perform additional work. The Forbearance Agreement may be terminated upon certain events. See “Risk Factors” and Note 11 of the Consolidated Financial Statements.

On December 18, 2012, the Company committed to the closing and subsequent disposition of the assets of S .T. Pipeline under the terms of the Forbearance Agreement and the Company’s restructuring plan.

A liquidation sale of the assets of S.T. Pipeline occurred on May 14, 2013. Results relating to S.T. Pipeline up to the date of the liquidation sale of assets are as follows:

|  |  |
| --- | ---: |
| Gross proceeds | $8,105,230 |
| Commission | (709,208) |
| Other auction expenses | (162,109) |
| Net proceeds | $7,233,913 |
| Book value of equipment | 5,325,916 |
| Gain on sale | $1,907,997 |

The Forbearance Agreement, which was originally set to expire on May 31, 2013, was extended to May 31, 2014 as reported in the Company’s May 6, 2013 Form 8-K filing. The agreement requires the Company to recapitalize the Company through the sale of Preferred Stock in an amount not less than $6.0 million. As of September 30, 2013 we have received $5.0 million in order to satisfy this requirement. Of this amount $1.0 million has been used to repay a portion of the outstanding line of credit balance and the remainder will be used as operating capital by the Company.

In addition, on August 6, 2013, the Company issued 56 shares of Series A Preferred Stock to Marshall T. Reynolds, the Chairman of the Board of Directors of the Company, in exchange for Mr. Reynolds’ agreement to cancel and forgive the Company’s obligation under a promissory note held by Mr. Reynolds in the aggregate amount of $1.4 million (including principal and accrued but unpaid interest). Mr. Reynolds did not receive any shares of common stock in connection with the exchange of the promissory note. This was reported in Company’s August 8, 2013 Form 8-K filing.

On September 6, 2013, the Company entered into an amendment to the Forbearance Agreement which extends the period under which the Company must raise funds and establishes tranches in which the capital and cash components of the capital raise must be undertaken. The amendment also requires the Company to pay the greater of $1.0 million or 50% of the amount collected on a claim the Company is pursuing against a third party, with which, the Company reached a settlement agreement on December 5, 2013. See below for further details. The amendment states that the amount of debt held by Mr. Reynolds and converted into equity shall be counted toward the $1.5 million in equity to be raised by August 31, 2013. The agreement also requires the Company to raise $1.5 million cash equity by September 30, 2013 and $1.4 million cash equity by December 31, 2013. This was reported in the Company’s September 9, 2013 Form 8-K filing.

On September 9, 2013, the Company entered into an agreement with Centrus which supercedes its prior agreement. Pursuant to the new agreement Centrus’ role as Chief Restructuring Agent had ended and Centrus will now act as Financial Advisor to the Company. This was reported in the Company’s September 11, 2013 Form 8-K filing.

On October 1, 2013, the Company entered into an amendment to the Forbearance Agreement which extends the period under which the Company must raise $1.025 million in cash equity previously due to be raised by September 30, 2013 until October 31, 2013. This was reported in the Company’s October 4, 2013 Form 8-K filing. The Company had raised $475,000 towards the September 30, 2013 deadline before the extension and the requirement to raise an additional $1.4 million cash equity by December 31, 2013 remained unchanged.

On December 5, 2013, the Company entered into a settlement agreement for its claim against a third party. The agreement calls for the Company to receive $2,350,000 within 10 days of the execution of the agreement. The Company recorded $2,200,000 in revenue on this claim as of September 30, 2013.

On December 12, 2013, the Company entered into an amendment to the Forbearance Agreement which extends the period under which the Company must raise $1.025 million in cash equity previously due to be raised by October 31, 2013 until December 31, 2013. This was reported in the Company’s December 13, 2013 Form 8-K filing. The requirement to raise an additional $1.4 million cash equity by December 31, 2013 remained unchanged.

### Backlog/New Business

Our Company’s backlog represents contracts for services that have been entered into but which have not yet been completed. At September 30, 2013, Energy Services had a backlog of $52.6 million on work to be completed on existing contracts. At September 30, 2012, the Company had a backlog of $57.4 million. Due to the timing of ESA’s construction contracts and the long-term nature of some of our projects, portions of our backlog may not be completed in the current fiscal year. Most of the Company’s projects can be completed in a short period of time, typically two to five months. Larger projects usually take seven to eighteen months to be completed. As a general rule, work starts shortly after the signing of the contract. Our backlog and our ability to obtain and perform work in the future will be affected by the constraints of the Forbearance Agreement between the Company and our lender. See “Risk Factors” and Note 11 of the Notes to Consolidated Financial Statements.

### Types of Contracts

Energy Services’ contracts are usually awarded on a competitive and negotiated basis. While contracts may be of a lump sum for a project or one that is based upon time and materials, most of the work is bid based upon unit prices for various portions of the work with a total agreed-upon price based on estimated units. The actual revenues produced from the project will be dependent upon how accurate the customer estimates are as to the units of the various items.

### Raw Materials and Suppliers

The principal raw materials that the Company uses are metal plate, structural steel, pipe, wire, fittings and selected engineering equipment such as pumps, valves and compressors. For the most part, the largest portion of these materials are supplied by the customer. The materials that ESA purchases would predominately be those of a consumable nature on the job, such as small tools and environmental supplies. We anticipate being able to obtain these materials for the foreseeable future.

### Industry Factors

Energy Services’ revenues, cash flows and earnings are substantially dependent upon, and affected by, the level of natural gas exploration development activity and the levels of work on existing pipelines as well as the level of demand for our electrical services. Such activity and the resulting level of demand for pipeline construction and related services and electrical services are directly influenced by many factors over which the Company has no control. Such factors include the market prices of natural gas and electricity, market expectations about future prices, the volatility of such prices, the cost of producing and delivering natural gas and electricity, government regulations and trade restrictions, local and international political and economic conditions, the development of alternate energy sources, changes in the tax code that affect the energy industry, and the long-term effects of worldwide energy conservation measures. Substantial uncertainty exists as to the future level of natural gas exploration and development activity as well as the demand for our electrical services.

Energy Services cannot predict the future level of demand for its construction services, future conditions in the pipeline or electrical construction industry or future pipeline and electrical construction rates.

Energy Services maintains a banking relationship with a regional bank and has lines of credit and borrowing facilities with this institution. The Company is currently operating under the terms of the Forbearance Agreement with our lender. Under the terms of the agreement we cannot make additional draws on our revolving line of credit. We can apply for a separate forbearance line of credit, but the lender is not obligated to approve it. The Forbearance Agreement may be terminated upon certain events and in any case on May 31, 2014. The limits on our ability to obtain funds for working capital will severely impact our ability to obtain and perform future services.

### Competition

The pipeline construction industry is a highly competitive business characterized by high capital and maintenance costs. Pipeline contracts are usually awarded through a competitive bid process and, while the Company believes that operators consider factors such as quality of service, type and location of equipment, or the ability to provide ancillary services, price and the ability to complete the project in a timely manner are the primary factors in determining which contractor is awarded a job. There are a number of regional and national competitors that offer services similar to Energy Services. Certain of the Company’s competitors have greater financial and human resources than Energy Services, which may enable them to compete more efficiently on the basis of price and technology. The Company’s largest competitors are Otis Eastern, Miller Pipeline, Brown Electric, Summit Electric and Apex Pipeline.

### Operating Hazards and Insurance

Energy Services’ operations are subject to many hazards inherent in the pipeline construction business, including, for example, operating equipment in mountainous terrain, people working in deep trenches and people working in close proximity to large equipment. These hazards could cause personal injury or death, serious damage to or destruction of property and equipment, suspension of drilling operations, or substantial damage to the environment, including damage to producing formations and surrounding areas. Energy Services seeks protection against certain of these risks through insurance, including property casualty insurance on its equipment, commercial general liability and commercial contract indemnity, commercial umbrella and workers’ compensation insurance.

The Company’s insurance coverage for property damage to its equipment is based on estimates of the cost of comparable used equipment to replace the insured property. There is a deductible per occurrence on rigs and equipment of $2,500 and $2,500 for damage to miscellaneous tools. The Company also maintains third party liability insurance and a commercial umbrella policy. Energy Services believes that it is adequately insured for public liability and property damage to others with respect to its operations. However, such insurance may not be sufficient to protect Energy Services against liability for all consequences of well disasters, extensive fire damage or damage to the environment.

### Government Regulation and Environmental Matters

***General.*** Energy Services’ operations are affected from time to time in varying degrees by political developments and federal, state and local laws and regulations. In particular, natural gas production, operations and the profitability of the gas industry are or have been affected by price controls, taxes and other laws relating to the natural gas industry, by changes in such laws and by changes in administrative regulations. Although significant capital expenditures may be required to comply with such laws and regulations, to date, such compliance costs have not had a material adverse effect on the earnings or competitive position of Energy Services. In addition, Energy Services’ operations are vulnerable to risks arising from the numerous laws and regulations governing the discharge of materials into the environment or otherwise relating to environmental protection.

***Environmental Regulation.*** Energy Services’ activities are subject to existing federal, state and local laws and regulations governing environmental quality, pollution control and the preservation of natural resources. Such laws and regulatory concerns, among other things, the containment, disposal and recycling of waste materials, and reporting of the storage, use or release of certain chemicals or hazardous substances. Numerous federal and state environmental laws regulate drilling activities and impose liability for discharges of waste or spills, including those in coastal areas. The Company has conducted pipeline construction in or near ecologically sensitive areas, such as wetlands and coastal environments, which are subject to additional regulatory requirements. State and federal legislation also provide special protections to animal and marine life that could be affected by the Company’s activities. In general, under various applicable environmental programs. The Company may potentially be subject to regulatory enforcement action in the form of injunctions, cease and desist orders and administrative, civil and criminal penalties for violations of environmental laws. Energy Services may also be subject to liability for natural resource damages and other civil claims arising out of a pollution event. The Company would be responsible for any pollution event that was determined to be caused by its actions. It has insurance that it believes is adequate to cover any such occurrences.

Environmental regulations that affect Energy Services’ customers also have an indirect impact on Energy Services. Increasingly stringent environmental regulation of the natural gas industry has led to higher drilling costs and a more difficult and lengthy well permitting process.

The primary environmental statutory and regulatory programs that affect Energy Services’ operations include the following: Department of Transportation regulations, regulations set forth by agencies such as the Federal Energy Regulatory Commission and various environmental agencies including state, federal and local government.

***Health and Safety Matters.*** Energy Services’ facilities and operations are also governed by various other laws and regulations, including the federal Occupational Safety and Health Act, relating to worker health and workplace safety. As an example, the Occupational Safety and Health Administration has issued the Hazard Communication Standard. This standard applies to all private-sector employers, including the natural gas exploration and producing industry. The Hazard Communication Standard requires that employers assess their chemical hazards, obtain and maintain certain written descriptions of these hazards, develop a hazard communication program and train employees to work safely with the chemicals on site. Failure to comply with the requirements of the standard may result in administrative, civil and criminal penalties. Energy Services believes that appropriate precautions are taken to protect employees and others from harmful exposure to materials handled and managed at its facilities and that it operates in substantial compliance with all Occupational Safety and Health Act regulations. While it is not anticipated that Energy Services will be required to make material expenditures by reason of such health and safety laws and regulations, Energy Services is unable to predict the ultimate cost of compliance with these changing regulations.

### Research and Development/Intellectual Property

Energy Services has not made any material expenditure for research and development. Energy Services does not own any patents, trademarks or licenses.

### Legal Proceedings

Energy Services is not a party to any legal proceedings, other than in the ordinary course of business, that if decided in a manner adverse to the Company would be materially adverse to Energy Services’ financial condition or results of operations. At September 30, 2013, the Company was not involved in any material legal proceedings, the outcome of which would have a material adverse effect on its financial condition or results of operations.

### Facilities and Other Property

The Company and its subsidiaries own the property where its subsidiary C J Hughes and the Company’s headquarters are located. All other facilities are leased. The total amount of the lease payments for the various locations is $11,751 per month. The Company’s management believes that its properties are adequate for the business it conducts.

### Employees

As of September 30, 2013, the Company had approximately 610 employees including management. A number of the Company’s employees are represented by trade unions represented by various collective bargaining units.

## Risk factors

As filed, 13,121 characters.

Our business is subject to a variety of risks and uncertainties, including, but not limited to, the risk and uncertainties described below. The risks and uncertainties described below are not the only ones we may face. Additional risks and uncertainties not known to us or not described below also may impair our business operations. If any of the following risks actually occur, our business financial condition and results of operations could be harmed and we may not be able to achieve our expectations, projections, intentions or beliefs about future events that are intended as “forward-looking statements” under Private Securities Litigation Reform Act of 1995 and should be read in conjunction with the section entitled “Forward looking statements”.

***Our Independent Registered Auditing Firm has expressed substantial doubt as to our ability to continue as a going concern.***

In connection with their audit of our 2013 financial statements, Arnett Foster Toothman, our independent public auditing firm as part of its audit report on our financial statements expressed substantial doubt about the ability of the Company to continue as a “going concern”. The financial difficulties giving rise to Arnett Foster Toothman’s conclusion include the significant and sustained losses that the Company has incurred over recent years as well as our inability to secure loans and lines of credit to fund our business in a manner deemed adequate to conduct our business. Although pursuant to the terms of the Forbearance Agreement we are exploring all avenues to return to profitability, there can be no assurance that we will be able to successfully resolve the factors that gave rise to Arnett Foster Toothman’s decision to render its “going concern” opinion. See Note 3 and Note 11 of Notes to the Consolidated Financial Statements.

### Our operating results may vary significantly from quarter to quarter.

We typically experience lower volumes and lower margins during the winter months due to lower demand for our pipeline services and more difficult operating conditions. Also, other items that can materially affect our quarterly results include:

Adverse weather

Variations in the mix of our work in any particular quarter

Unfavorable regional, national or global economic and market conditions

A reduction in the demand for our services

Changes in customer spending patterns

Unanticipated increases in construction and design costs

Timing and volume of work we perform

Termination of existing agreements

Losses experienced not covered by insurance

Payment risks associated with customer financial condition

Changes in bonding requirements of agreements

Interest rate variations

Changes in accounting pronouncements

Acquisitions and the integration of them and the costs associated with such integration.

### Credit facilities to fund our operations and growth might not be available.

Our business relies heavily on having lines of credit in place to fund the various projects we are working on. Should acceptable funding not be available, it could severely curtail our operations and the ability to generate profits. We are currently subject to a Forbearance Agreement with our lender covering our revolving line of credit and term debt. Under the terms of the agreement we are currently unable to make additional draws on the line of credit. Unless we are able to find alternative financing and / or raise capital through an equity offering, we will be severely constrained in our ability to obtain and perform future work.

***We have sold Units, each consisting of one share of 6.0% Convertible Perpetual Preferred Stock, Series A and 2,500 shares of Common Stock. If the Preferred Stock is converted to Common Stock you may experience dilution of you ownership interest.***

As of September 30, 2013 the Company sold 140 units in a private placement to accredited investors. As a result of the private placement, an additional 350,000 shares of common stock were outstanding as of September 30, 2013. The Company also repurchased 300,000 shares of common stock that was previously outstanding at par value. The Company also issued 56 shares of Preferred Stock to Marshall Reynolds, Chairman of the Board of Directors, in exchange for a debt forgiveness of $1.4 million. Mr. Reynolds did not receive any shares of Common Stock in this transaction. In addition, if the Company elects to allow the holders of the Preferred Stock to choose to convert their Preferred Stock into shares of common stock we would have an additional 3,266,667 shares of Common Stock outstanding. The private placement and potential issuance of 3,316,667 shares, including shares repurchased, will result in shareholders experiencing a dilution in their ownership interest.

***An economic downturn in the industries we serve could lead to less demand for our services.***

In addition to the effects of an economic recession there could be industry specific reductions in the industries that we serve. If the demand for natural gas should drop dramatically, or the demand for electrical services drop dramatically, these would in turn result in less demand for our services.

***Project delays or cancellations may result in additional costs to us, reductions in revenues or the payment of liquidated damages.***

In certain circumstances, we guarantee project completion by a scheduled acceptance date or have achievement of certain acceptance and performance testing levels. Failure to meet any of these requirements could result in additional costs or penalties which could exceed the expected project profits.

### We may be unsuccessful at generating internal growth.

Our ability to generate internal growth will be affected by our ability to:

Attract new customers

Expand our relationships with existing customers

Hire and maintain qualified employees

Expand geographically

Adjust quickly to changes in our industry

The weak recovery could significantly limit the number and size of projects that we have the opportunity to bid on. Many of the factors that could limit our internal growth are beyond our control.

### Our industry is highly competitive.

Our industry has been and remains competitive with competitors ranging from small owner operated companies to large public companies. Within that group there may be companies with lower overhead who may be able to price their services at lower levels than we can. Accordingly, if that occurs, our business opportunities could be severely limited.

### The type of contracts we obtain could adversely affect our profitability.

We enter into various types of contracts, some fixed price, some variable pricing. On fixed price contracts our profits could be curtailed or eliminated by unanticipated pricing increases associated with the contract.

***Changes by the government in laws regulating the industries we serve could reduce our volumes.***

If the government enacts legislation that has a serious impact on the industries we serve, it could lead to the curtailment of capital projects in those industries and therefore lead to lower volumes for our Company.

***Many of our contracts can be cancelled or delayed or may not be renewed upon completion.***

If our customers should cancel or delay many projects, our revenues could be reduced if we are unable to replace these contracts with others. Also, we have contracts that expire and are rebid periodically. If we are unsuccessful in rebidding those contracts, that could reduce our revenue as well.

***Our business requires a skilled labor force and if we are unable to attract and retain qualified employees, our ability to maintain our productivity could be impaired.***

Our productivity depends upon our ability to employ and maintain skilled personnel to meet our requirements. Should some of our key managers leave us, it could limit our productivity. Also, many of our labor personnel are trade union members. Should we encounter problems associated with our union employees or if we are unable to employ sufficient available operators, welders, or other skilled labor, our production could be significantly curtailed.

### Our backlog may not be realized.

Our backlog could be reduced due to cancellation of projects by customers and/or reductions in scope of the projects. Should this occur, our anticipated revenues would be reduced unless we were able to replace those contracts. Additionally, we are currently limited in the working capital available to us under the terms of the Forbearance Agreement with our lender, and this could affect our ability to perform the contracts under our current backlog.

***We extend credit to customers for purchases of our services and therefore have risk that they may not be able to pay us.***

While we have not had any significant problems with collections of accounts receivables historically, should there be an economic downturn our customers’ inability to pay us would be compromised, and this may curtail our operations and ability to operate profitably.

***We may incur liabilities or suffer negative financial or reputational impacts relating to occupational health and safety matters.***

Our operations are subject to extensive laws and regulations relating to the maintenance of safe conditions in the workplace. While we are constantly monitoring our health and safety programs, our industry involves a high degree of operating risk and there can be no assurance given that we will avoid significant liability exposure and/or be precluded from working for various customers due to high incident rates.

***Our dependence on suppliers, subcontractors and equipment manufacturers could expose us to risk of loss in our operations.***

On certain projects, we rely on suppliers to obtain the necessary materials and subcontractors to perform portions of our services. We also rely on equipment manufacturers to provide us with the equipment needed to conduct our operations. Any limitation on the availability of materials or equipment or failure to complete work on a timely basis by subcontractors in a quality fashion, could lead to added costs and therefore lower profitability for the Company.

***During the ordinary course of business, we may become subject to lawsuits or indemnity claims, which could materially and adversely affect our business and results of operations.***

From time to time, we may in the ordinary course of business be named as a defendant in lawsuits, claims and other legal proceedings. These actions may seek, among other things, compensation for alleged personal injury, worker’s compensation, employment discrimination, breach of contract, property damages, civil penalties and other losses of injunctive or declaratory relief. Also, we often indemnify our customers for claims related to the services we provide and actions we take under our contracts with them. Because our services in certain instances may be integral to the operation and performance of our customers’ infrastructure, we may become subject to lawsuits or claims for any failure of the systems we work on. While we insure against such claims, the outcomes of any of the lawsuits, claims or legal proceedings could result in significant costs and diversion of management’s attention to the business. Payments of significant amounts, even if reserved, could adversely affect our reputation, liquidity and results of operations.

***A portion of our business depends on our ability to provide surety bonds. We may be unable to compete on certain projects if we are not able to obtain the necessary surety bonds.***

Current or future market conditions, including losses in the construction industry or as a result of large corporate bankruptcies, as well as changes in our sureties’ assessment of our operating and financial risk, could cause our surety providers to decline to issue or renew, or substantially reduce the amount of bonds for our work or could increase our bonding costs. These actions could be taken on short notice. Since a growing number of our customers require such bonding, should our surety providers limit or eliminate our access to bonding, our performance could be negatively impacted if we are unable to replace the bonded business with work that does not require bonding or if we are unable to provide other means of securing the jobs performance such as with letters of credit or cash.

***Our failure to comply with environmental laws could result in significant liabilities.***

Our operations are subject to various environmental laws and regulations, including those dealing with the handling and disposal of waste products, PCB’s, fuel storage, etc. We also work around and under bodies of water. We spend a great deal of time and money to make sure that we are compliant with the appropriate laws and regulations. However, if we should inadvertently cause contamination of waters or soils, liabilities for our Company relating to cleanup and remediation could be substantial and could exceed any insurance coverage we might have and result in a negative impact to the company’s ability to operate.

## Legal proceedings

As filed, 161 characters.

At September 30, 2013, we were not involved in any legal proceedings, the outcome of which would be material to our financial condition or results of operations.

## Management's discussion and analysis

As filed, 56,316 characters.

*You should read the following discussion of the financial condition and results of operations of Energy Services in conjunction with the historical financial statements and related notes contained elsewhere herein. Among other things, those historical consolidated financial statements include more detailed information regarding the basis of presentation for the following information.*

### Forward Looking Statements

Within Energy Services’ consolidated financial statements and this discussion and analysis of the financial condition and results of operations, there are included statements reflecting assumptions, expectations, projections, intentions or beliefs about future events that are intended as “forward-looking statements” under the Private Securities Litigation Reform Act of 1995. You can identify these statements by the fact that they do not relate strictly to historical or current facts. They use words such as “anticipate,” “estimate,” “project,” “forecast,” “may,” “will,” “should,” “could,” “expect,” “believe,” “intend” and other words of similar meaning.

These forward-looking statements are not guarantees of future performance and involve or rely on a number of risks, uncertainties, and assumptions that are difficult to predict or beyond Energy Services’ control. Energy Services has based its forward-looking statements on management’s beliefs and assumptions based on information available to management at the time the statements are made. Actual outcomes and results may differ materially from what is expressed, implied and forecasted by forward-looking statements and that any or all of Energy Services’ forward-looking statements may turn out to be wrong. They can be affected by inaccurate assumptions and by known or unknown risks and uncertainties.

All of the forward-looking statements, whether written or oral, are expressly qualified by these cautionary statements and any other cautionary statements that may accompany such forward-looking statements or that are otherwise included in this report. In addition, Energy Services does not undertake and expressly disclaims any obligation to update or revise any forward-looking statements to reflect events or circumstances after the date of this report or otherwise.

### Overview

Until August 15, 2008, Energy Services of America (ESA) operated as a blank check company. On August 15, 2008, the Company completed the acquisitions of S.T. Pipeline, Inc. and C.J. Hughes Construction Company, Inc. Each of S.T. Pipeline and C.J. Hughes are held as separate subsidiaries of ESA.

Energy Services is engaged in providing contracting services for energy related companies. Currently Energy Services primarily services the Gas, Oil and Electrical industries though it does some other incidental work. For the Gas industry, the Company is primarily engaged in the construction, replacement and repair of natural gas pipelines and storage facilities for utility companies and private natural gas companies. Energy Services is involved in the construction of both interstate and intrastate pipelines, with an emphasis on the latter. For the Oil industry the Company provides a variety of services relating to pipeline, storage facilities and plant work. For the Electrical industry, the Company provides a full range of electrical installations and repairs including substation and switchyard services, site preparation, packaged buildings, transformers and other ancillary work with regards thereto. Energy Services’ other services include liquid pipeline construction, pump station construction, production facility construction, water and sewer pipeline installations, various maintenance and repair services and other services related to pipeline construction. The majority of the Company’s customers are located in West Virginia, Virginia, Ohio, Pennsylvania, Kentucky and North Carolina. The Company builds, but does not own, natural gas pipelines for its customers that are part of both interstate and intrastate pipeline systems that move natural gas from producing regions to consumption regions as well as building and replacing gas line services to individual customers of the various utility companies. Our consolidated operating revenues for the year ended September 30, 2013 were $110.9 million which 53% was attributable to gas contract work, 37% to electrical contract services and 10% to water and sewer contract installations and other ancillary services. The Company had consolidated operating revenues of $157.7 million for the year ended September 30, 2012 of which 72% was attributable to gas contract work, 19% to electrical contract services customers, and 9% for water and sewer contract installation and other ancillary services.

Energy Services’ customers include many of the leading companies in the industries it serves, including Marathon Petroleum LLC, Columbia Gas, Equitable Resources, Toyota and Dow Chemical. The Company enters into various types of contracts, including competitive unit price, cost-plus (or time and materials basis) and fixed price (lump sum) contracts. The terms of the contracts will vary from job to job and customer to customer though most contracts are on the basis of either unit pricing in which the Company agrees to do the work for a price per unit of work performed or for a fixed amount for the entire project. Most of the Company’s projects are completed within one year of the start of the work. On occasion, the Company’s customers will require the posting of performance and/or payment bonds upon execution of the contract, depending upon the nature of the work performed.

The Company generally recognizes revenue on unit price and cost-plus contracts when units are completed or services are performed. Fixed price contracts usually results in recording revenues as work on the contract progresses on a percentage of completion basis. Under this accounting method, revenue is recognized based on the percentage of total costs incurred to date in proportion to total estimated costs at completion. Many contracts also include retainage provisions under which a percentage of the contract price is withheld until the project is complete and has been accepted by the customer.

A goodwill impairment charge was recorded in the fourth fiscal quarter of 2012 in the amount of $36.9 million, representing all of the goodwill on our balance sheet. Based on our continued operating losses and management’s forecasts of future cash flows our goodwill impairment test indicated that the goodwill of the Company had no value. See Note 4 of the Consolidated Financial Statements.

In connection with their audit of our 2013 financial statements, Arnett Foster Toothman, our independent public auditing firm as part of its audit report on our financial statements expressed substantial doubt about the ability of the Company to continue as a “going concern”. The financial difficulties giving rise to Arnett Foster Toothman’s conclusion include the significant and sustained losses that the Company has incurred over recent years as well as our inability to secure loans and lines of credit to fund our business in a manner deemed adequate to conduct our business. Although pursuant to the terms of the Forbearance Agreement we are exploring all avenues to return to profitability, there can be no assurance that we will be able to successfully resolve the factors that gave rise to Arnett Foster Toothman’s decision to render its “going concern” opinion.

On September 28, 2011, we completed an exchange offer pursuant to which we exchanged 8 ½ warrants for one share of common stock. Following the completion of the exchange offer any warrants which were not exchanged expired on October 12, 2011. On November 14, 2011, we delisted from the NYSE AMEX the warrants and units. Following the completion of the exchange offer and expiration of the warrants that were not tendered, we had 14,446,836 shares of common stock issued and outstanding and no warrants or units outstanding.

On November 6, 2012 the New York Stock Exchange advised the Company that it had failed to satisfy certain NYSE continuing listing standards and would be subject to immediate delisting proceedings. The Company’s stock trades under the symbol “ESOA” and transactions in the stock are reported on the Over-the-Counter market.

On November 28, 2012, the Company entered into a Forbearance Agreement with our lender related to our revolving line of credit and term debt. The Forbearance Agreement has subsequently been amended. Under the terms of the Forbearance Agreement, the Company has restructured its operations, which included the liquidation of S.T. Pipeline among other things. Also, under the terms of the agreement we cannot make additional draws on the revolving line of credit. Although the Company can request the establishment of a forbearance line of credit, the lender is under no obligation to approve it. The limitations on our working capital had a severe impact on our ability to obtain and perform additional work. The Forbearance Agreement may be terminated upon certain events. See "Risk Factors" and Note 11 of the Consolidated Financial Statements.

A liquidation sale of the assets of S.T. Pipeline occurred on May 14, 2013. Results relating to S.T. Pipeline up to the date of the liquidation sale of assets are as follows:

|  |  |
| --- | ---: |
| Gross proceeds | $8,105,230 |
| Commission | (709,208) |
| Other auction expenses | (162,109) |
| Net proceeds | $7,233,913 |
| Book value of equipment | 5,325,916 |
| Gain on sale | $1,907,997 |

The Forbearance Agreement, which was originally set to expire on May 31, 2013, was extended to May 31, 2014 as reported in the Company’s May 6, 2013 Form 8-K filing. The agreement requires the Company to recapitalize the Company through the sale of Preferred Stock in an amount not less than $6.0 million. As of September 30, 2013 we have received $5.0 million in order to satisfy this requirement. Of this amount $1.0 million has been used to repay a portion of the outstanding line of credit balance and the remainder will be used as operating capital by the Company.

In addition, on August 6, 2013, the Company issued 56 shares of Series A Preferred Stock to Marshall T. Reynolds, the Chairman of the Board of Directors of the Company, in exchange for Mr. Reynolds’ agreement to cancel and forgive the Company’s obligation under a promissory note held by Mr. Reynolds in the aggregate amount of $1.4 million (including principal and accrued but unpaid interest). Mr. Reynolds did not receive any shares of common stock in connection with the exchange of the promissory note. This was reported in the Company’s August 8, 2013 Form 8-K filing.

On September 6, 2013, the Company entered into an amendment to the Forbearance Agreement which extends the period under which the Company must raise funds and establishes tranches in which the capital and cash components of the capital raise must be undertaken. The amendment also requires the Company to pay the greater of $1.0 million or 50% of the amount collected on a claim the Company is pursuing against a third party, with which, the Company reached a settlement agreement on December 5, 2013. See below for further details. The amendment states that the amount of debt held by Mr. Reynolds and converted into equity shall be counted toward the $1.5 million in equity to be raised by August 31, 2013. The agreement also requires the Company to raise $1.5 million cash equity by September 30, 2013 and $1.4 million cash equity by December 31, 2013. This was reported in the Company’s September 9, 2013 Form 8-K filing.

On September 9, 2013, the Company entered into an agreement with Centrus which supercedes its prior agreement. Pursuant to the new agreement Centrus’ role as Chief Restructuring Agent had ended and Centrus will now act as Financial Advisor to the Company. This was reported in the Company’s September 11, 2013 Form 8-K filing.

On October 1, 2013, the Company entered into an amendment to the Forbearance Agreement which extends the period under which the Company must raise $1.025 million in cash equity previously due to be raised by September 30, 2013 until October 31, 2013. This was reported in the Company’s October 4, 2013 Form 8-K filing. The Company had raised $475,000 towards the September 30, 2013 deadline before the extension and the requirement to raise an additional $1.4 million cash equity by December 31, 2013 remained unchanged.

On December 5, 2013, the Company entered into a settlement agreement for its claim against a third party. The agreement calls for the Company to receive $2,350,000 within 10 days of the execution of the agreement. The Company recorded $2,200,000 in revenue on this claim as of September 30, 2013.

On December 12, 2013, the Company entered into an amendment to the Forbearance Agreement which extends the period under which the Company must raise $1.025 million in cash equity previously due to be raised by October 31, 2013 until December 31, 2013. This was reported in the Company’s December 13, 2013 Form 8-K filing. The requirement to raise an additional $1.4 million cash equity by December 31, 2013 remained unchanged.

### Seasonality: Fluctuation of Results

Our revenues and results of operations can and usually are subject to seasonal variations. These variations are the result of weather, customer spending patterns, bidding seasons and holidays. The first quarter of the calendar year is typically the slowest in terms of revenues because inclement weather conditions causes delays in production and customers usually do not plan large projects during that time. While usually better than the first quarter, the second quarter often has some inclement weather which can cause delays in production, reducing the revenues the Company receives and/or increasing the production costs. The third quarter usually is least impacted by weather and usually has the largest number of projects underway. The fourth quarter is usually lower than the third due to the various holidays. Many projects are completed in the fourth quarter and revenues are often impacted by customers seeking to either spend their capital budget for the year or scale back projects due to capital budget overruns.

In addition to the fluctuations discussed above, the pipeline industry can be highly cyclical, reflecting variances in capital expenditures in proportion to energy price fluctuations. As a result, our volume of business may be adversely affected by where our customers are in the cycle and thereby their financial condition as to their capital needs and access to capital to finance those needs.

Accordingly, our operating results in any particular quarter or year may not be indicative of the results that can be expected for any other quarter or any other year. You should read “*Understanding Gross Margins”* and “*Outlook”* below for discussions of trends and challenges that may affect our financial condition and results of operations.

### Understanding Gross Margins

Our gross margin is gross profit expressed as a percentage of revenues. Cost of revenues consists primarily of salaries, wages and some benefits to employees, depreciation, fuel and other equipment costs, equipment rentals, subcontracted services, portions of insurance, facilities expense, materials and parts and supplies. Various factors, some controllable, some not impact our gross margin on a quarterly or annual basis.

***Seasonal.*** As discussed above, seasonal patterns can have a significant impact on gross margins. Usually, business is slower in the winter months versus the warmer months.

***Weather.*** Adverse or favorable weather conditions can impact gross margin in a given period. Periods of wet weather, snow or rainfall, as well as severe temperature extremes can severely impact production and therefore negatively impact revenues and margins. Conversely, periods of dry weather with moderate temperatures can positively impact revenues and margins due to the opportunity for increased production and efficiencies.

***Revenue Mix.*** The mix of revenues between customer types and types of work for various customers will impact gross margins. Some projects will have greater margins while others that are extremely competitive in bidding may have narrower margins.

***Service and Maintenance versus installation.*** In general, installation work has a higher gross margin than maintenance work. This is due to the fact that installation work usually is more of a fixed price nature and therefore has higher risks involved. Accordingly, a higher portion of the revenue mix from installation work typically will result in higher margins.

***Subcontract work.*** Work that is subcontracted to other service providers generally has lower gross margins. Increases in subcontract work as a percentage of total revenues in a given period may contribute to a decrease in gross margin.

***Materials versus Labor.*** Typically materials supplied on projects have lower margins than labor. Accordingly, projects with a higher material cost in relation to the entire job will have a lower overall margin.

***Depreciation.*** Depreciation is included in our cost of revenue. This is a common practice in our industry, but can make comparability to other companies difficult.

***Margin risk.*** Failure to properly execute a job including failure to properly manage and supervise a job could decrease the profit margin.

### Selling, General and Administrative Expenses

Selling, general and administrative expenses consist primarily of compensation and related benefits to management, administrative salaries and benefits, marketing, communications, office and utility costs, professional fees, bad debt expense, letter of credit fees, general liability insurance and miscellaneous other expenses.

### Results of Operations

The following table sets forth the Consolidated Statement of Operations for the years ended September 30, 2013 and 2012.

*(In Thousands)*

*(In Thousands)*

|  | Year Ended September 30, 2013 Amount | 2012 Amount |
| --- | ---: | ---: |
| Revenues | $108,820 | $109,020 |
| Cost of revenues | 98,804 | 104,375 |
| Gross profit | 10,016 | 4,645 |
| Selling, general and administrative expenses | 8,048 | 9,856 |
| Asset impairment | - | 32,737 |
| Income (loss) from operations before taxes | 1,968 | (37,948) |
| Interest income | 1 | 3 |
| Interest expense | (1,740) | (1,927) |
| Gain on sale of assets | 531 | 25 |
| Other income (expense) | (12) | 3 |
| Income (loss) from continuing operations before income taxes | 748 | (39,844) |
| Income tax expense (benefit) | (1,319) | 1,551 |
| Net income (loss) from continuing operations | 2,067 | (41,395) |
| Income (loss) from discontinued operations, net of tax benefit | 1,503 | (7,127) |
| Net income (loss) | $3,570 | $(48,522) |
| Weighted average shares outstanding-basic | 14,461,383 | 14,448,336 |
| Weighted average shares outstanding-diluted | 14,923,255 | 14,448,336 |
| Earnings (loss) per share from continuing operations-basic | $0.143 | $(2.865) |
| Earnings (loss) per share from continuing operations-diluted | $0.139 | $(2.865) |
| Earnings (loss) per share | $0.247 | $(3.358) |
| Earnings (loss) per share | $0.239 | $(3.358) |

Due to organizational changes and operating losses incurred in fiscal year 2012, the Company decided to discontinue the operations of the wholly owned subsidiary S.T. Pipeline, Inc. The Company liquidated the assets of S.T. Pipeline on May 14, 2013. The net proceeds of $7,233,913 went to a designated bank group to reduce the balance on the Company’s Line of Credit (LOC) and term note balances.

The operating results for S.T. Pipeline, Inc. for September 30, 2013 and 2012 are as follows:

*(In Thousands)*

*(In Thousands)*

|  | Year Ended September 30, 2013 Amount | 2012 Amount |
| --- | ---: | ---: |
| Revenues | $2,103 | $48,719 |
| Cost of revenues | 3,252 | 51,681 |
| Gross loss | (1,149) | (2,962) |
| Selling, general and administrative expenses | 942 | 2,228 |
| Asset impairment | - | 4,177 |
| Loss from operations before taxes | (2,091) | (9,367) |
| Interest income | - | 1 |
| Interest expense | (1) | (5) |
| Gain on sale of assets | 2,149 | 20 |
| Other income (expense) | - | 136 |
| Income (loss) from discontinued operations before income taxes | 57 | (9,215) |
| Income tax benefit | (1,446 ) - | (2,088) |
| Net income (loss) from discontinued operations | $1,503 | $(7,127) |

19

### 2013 compared to 2012

***Revenues.*** Revenue decreased by $200,000 or 0.18% to $108.8 million on continuing operations for the year ended September 30, 2013. Revenue decreased by $46.6 million on discontinued operations due to the closure of S.T. Pipeline.

***Costs of Revenues.*** Cost of revenues decreased by $5.6 million or 5.3% to $98.8 million on continuing operations for the year ended September 30, 2013. The decrease in costs was due to losses on major jobs in fiscal year 2012 that did not reoccur in fiscal year 2013. Please see the second project listed below for details. Costs of revenues decreased by $48.4 million on discontinued operations due to the closure of S.T. Pipeline. Please see the first project listed below for details of a major project loss from fiscal year 2012.

***Gross Profit.*** Gross profits increased by $5.4 million or 115.7% to $10.0 million on continuing operations for the year ended September 30, 2013. The increase was due to the items mentioned above. Gross loss on discontinued operations decreased by $1.8 million to $1.1 million for the year ended September 30, 2013. The decrease was due to the items mentioned above.

***Selling, general and administrative expenses.*** Selling, general and administrative expenses decreased by $1.8 million or 32.6% to $8.0 million on continuing operations for the year ended September 30, 2013. The decrease was primarily driven by a significant reduction in administrative and executive personnel. Selling, general and administrative expenses decreased by $1.3 million to $942,000 on discontinued operations for the year ended September 30, 2013. The decrease reflects the closure of S.T. Pipeline.

***Asset Impairment.*** In the fourth fiscal quarter of 2012, the Company recorded a goodwill impairment charge of $36.9 million, which represented the entire amount of goodwill carried on the Company’s balance sheet. See Note 4 of the Notes to Consolidated Financial Statements. Asset impairment on continuing operations was $32.7 million for the year ended September 30, 2012. Asset impairment on discontinued operations was $4.2 million for the year ended September 30, 2012.

***Income (loss) from operations.*** Income from operations on continuing operations increased by $39.9 million to a profit of $2.0 million for the year ended September 30, 2013. The increase in income from continuing operations was primarily due to the $32.7 million write down of impaired goodwill in fiscal year 2012 as well as the effects of the items mentioned above. See Note 4 of the Consolidated Financial Statements. Loss from discontinued operations decreased by $7.3 million to $2.1 million for the year ended September 30, 2013. The decrease in loss from discontinued operations was primarily due to a $4.7 million write down of impaired goodwill in fiscal year 2012 as well as the effects of the items mentioned above. See Note 4 of the Consolidated Financial Statements.

***Interest Expense.*** Interest expense decreased by $188,000 or 9.7% to $1.7 million for the year ended September 30, 2013. The decrease was primarily due to the proceeds from the sale of S.T. Pipeline equipment being applied to reduce the outstanding debt owed to the bank group.

***Income Taxes.*** Income tax benefit on continuing operations for the period ending September 30, 2013 was $1.3 million as compared to income tax expense of $1.6 million for the period ending September 30, 2012. Income tax benefit on discontinued operations was $1.4 million for the period ending September 30, 2013 as compared to income tax benefit of $2.1 million for the period ending September 30, 2012. The Company’s effective tax rate (benefit) was (343.0)% for the period ending September 30, 2013 and (1.09)% for the period ending September 30, 2012. The 2012 effective tax rate was driven by the Company establishing a valuation allowance against its deferred tax assets to offset a significant portion of the Company’s federal and state tax benefits that were not expected to be used in future years. Due to a higher than expected taxable income resulting from operations and the sale of fixed assets in 2013, the Company recognized tax benefits from the reduction of net operating loss (NOL) carry forwards and the related valuation allowance. Furthermore, the Company projects the federal NOL carry forwards will be used over the next several years, and thus reduced the NOL valuation and increased the tax benefit by an additional $1.5 million for the period ended September 30, 2013. The Company currently has a tax asset related to NOL carry forwards of $5.0 million and a valuation allowance of $3.5 million for a net NOL asset of $1.5 million.

***Net Income (Loss).*** The net income for the year ended September 30, 2013 was $3.6 million, with $2.1 million resulting from continuing operations and $1.5 million resulting from proceeds from discontinued operations. The net loss incurred for the year ended September 30, 2012 was $48.5 million, with $41.4 million resulting from continuing operations and $7.1 million from discontinued operations.

As previously disclosed, the Company incurred substantial losses in 2012 related to two major projects. Below is the detail related to those losses:

|  | 12,000 ft 6” replacement and 14,000 ft 12” replacement 9/30/2011 | 12/31/2011 | At Quarter Ended 3/31/2012 | 6/30/2012 | 9/30/2012 | 12/31/2012 Completed |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Contract amount | $8,612,000 | $8,612,000 | $9,100,000 | $9,377,720 | $9,647,650 | $9,653,550 |
| Cost to date | 3,212,060 | 7,566,120 | 11,699,590 | 14,047,950 | 14,606,290 | 14,650,160 |
| Est. costs to complete | 4,060,500 | 1,200,000 | 2,250,000 | 250,000 | 63,000 | - |
| Est. costs at completion | 7,272,560 | 8,766,120 | 13,949,590 | 14,297,950 | 14,669,290 | 14,650,160 |
| Est. profit (loss) | $1,339,440 | $(154,120) | $(4,849,590) | $(4,920,230) | $(5,021,640) | $(4,996,610) |
| Percent complete | 44.2% | 86.3% | 83.9% | 98.3% | 99.6% | 100% |

|  | 9/30/2011 | 12/31/2011 | For Quarter Ended 3/31/2012 | 6/30/2012 | 9/30/2012 | 12/31/2012 Completed |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Earned revenue | $3,803,648 | $3,608,351 | $(562,000) | $2,277,720 | $456,930 | $68,900 |
| Costs of revenue | 3,212,060 | 4,354,060 | 4,133,470 | 2,348,360 | 558,340 | 43,870 |
| Gross profit (loss) | $591,588 | $(745,709) | $(4,695,470) | $(70,640) | $(101,410) | $25,030 |

This was a unit price project for the replacement of approximately 12,000 feet of six inch pipe and 14,000 feet of twelve inch pipe in McDowell County, West Virginia. The project began during the fourth quarter of fiscal year 2011 and was completed during the first quarter of fiscal year 2013. The contract began with an estimated value of $8,612,000 and through contract additions and extra work increased by $1,041,550 to a final contract price of $9,653,550. The project was billed every two weeks after actual quantities installed were agreed upon by a Company field supervisor and a customer inspector.

Earned revenue for each quarter was calculated using the percent complete method of revenue recognition. Total costs to date were compared to total forecasted costs at completion as provided by the project’s management team. The resulting percentage of costs completed was used to determine how much of the contract value to recognize as revenue. When the estimated costs at completion moved the project to a loss position, the full amount of the expected loss was recorded in that quarter.

The Company recognized $592,000 of profit on the project for the quarter ended September 30, 2011. However, the project began to experience difficulties in the quarter ended December 31, 2011 due to weather based project delays. At this time, the Company recognized a $746,000 loss for the quarter, and a loss of $154,000 for the project to date.

The project experienced more than anticipated weather delays and presented more challenging conditions, slowing the anticipated progress during the quarter ended March 31, 2012, at which time the Company recorded an additional $4.7 million loss. The major components of costs overruns during this period were labor, benefits, and equipment rental, all of which were greatly impacted due to lost time and inefficient production caused by the factors mentioned above. Union contracts negotiated with the various unions involved with the projects call for rain out and/or show up time to be paid even if work is stopped due to weather conditions. Total labor and benefit costs for the quarter was $3.0 million. In addition to the impact on labor costs, weather conditions also extend the amount of time outside equipment rentals are required to complete the project. Total outside equipment rental for the quarter was $560,000.

The project was completed during the first quarter of fiscal 2013 and finished with total revenue of $9,653,550, costs of $14,650,160 and a total project loss of $4,996,610. The Company does not anticipate any additional losses on this project.

|  | 12/31/2011 | 49,400 ft of 24” pipe At Quarter Ended 3/31/2012 | 6/30/2012 | 9/30/2012 | 12/31/2012 Completed |
| --- | ---: | ---: | ---: | ---: | ---: |
| Contract amount | $13,388,670 | $18,946,437 | $20,162,561 | $21,174,380 | $21,197,818 |
| Cost to date | 876,092 | 11,066,099 | 21,715,318 | 24,730,308 | 24,805,555 |
| Est. costs to complete | 11,977,031 | 7,673,385 | 926,944 | 25,000 | - |
| Est. costs at completion | 12,853,123 | 18,739,484 | 22,642,262 | 24,755,308 | 24,805,555 |
| Est. profit (loss) | $535,547 | $206,953 | $(2,479,701) | $(3,580,928) | $(3,607,737) |
| Percent complete | 6.8% | 59.1% | 95.9% | 99.9% | 100% |

|  | 12/31/2011 | For Quarter Ended 3/31/2012 | 6/30/2012 | 9/30/2012 | 12/31/2012 Completed |
| --- | ---: | ---: | ---: | ---: | ---: |
| Earned revenue | $912,596 | $10,275,714 | $8,047,307 | $1,913,764 | $48,438 |
| Costs of revenue | 876,092 | 10,190,007 | 10,649,219 | 3,014,990 | 75,247 |
| Gross profit (loss) | $36,504 | $85,707 | $(2,601,912) | $(1,101,226) | $(26,809) |

This was a unit price project for the replacement of approximately 49,400 feet of twenty four inch pipe in Wetzel County, West Virginia. The project began during the first quarter of fiscal year 2012 and was completed during the first quarter of fiscal year 2013. The contract began with an estimated value of $13,388,670 and through contract additions and extra work increased by $7,809,148 to a final contract price of $21,197,818. The project was billed every two weeks after actual quantities installed were agreed upon by a Company field supervisor and a customer inspector.

Earned revenue for each quarter was calculated using the percent complete method of revenue recognition. Total costs to date were compared to total forecasted costs at completion as provided by the project’s management team. The resulting percentage of costs completed was used to determine how much of the contract value to recognize as revenue. When the estimated costs at completion moved the project to a loss position, the full amount of the expected loss was recorded in that quarter.

The Company recognized $743,000 of profit on the project through the second quarter ended March 31, 2012. However, the project began to experience difficulties in the quarter ended June 30, 2012 due to weather based project delays and inefficient production. At this time, the Company recognized a $2.5 million loss for the quarter, and a loss of $1.7 million for the project to date. It was during this quarter that the Company fell behind schedule on the project and made an attempt to make up for the lost and inefficient production by maintaining a higher labor force and outside equipment rentals than was originally estimated. Major components of costs of revenues for the quarter were labor and burden of $7.1 million and outside equipment rental of $935,000.

The Company recognized another $1.1 million loss on the project during the quarter ended September 30, 2012. Costs for the quarter exceeded the estimated costs to complete as of June 30, 2012 by $2.1 million. Partially offsetting these higher costs, the estimated contract payments increased by $1.0 million. Major components of costs for the quarter were labor and burden of $1.4 million and outside equipment rentals of $500,000.

The project was completed during the quarter ended December 31, 2012 and finished with a total loss of $3.6 million. The Company does not anticipate any additional losses on this project.

The Company is not engaged in any major projects at this time where material losses are expected.

### Comparison of Financial Condition

The Company had total assets of $50.7 million at September 30, 2013, a decrease of $9.1 million from the prior fiscal year end balance. Some primary components of the balance sheet were accounts receivable which totaled $16.8 million, an increase of $1.1 million from the prior year end balance, retainages receivable of $2.7 million, an increase of $952,000 and estimated earnings in excess of billings of $9.0 million, a decrease of $1.8 million from the prior year end. Other major categories of assets at September 30, 2013 included cash of $6.2 million, an increase of $4.8 million from the prior year balance as well as net fixed assets of $9.8 million, a decrease of $9.3 million from prior year balance.

Liabilities totaled $35.8 million, a decrease of $17.6 million from the prior year balance. Current maturities of long-term debt decreased by $4.8 million. Line of credit and short term borrowings decreased by $8.4 million. In total, short-term debt decreased by $13.2 million primarily reflecting the use of net proceeds from equipment sold to pay down debt. Long –term debt decreased by $1.8 million. The decrease was primarily due to the $1.4 million debt forgiveness by Chairman of the Board, Marshall Reynolds in exchange for 56 shares of Preferred Stock. Overall, the long-term and short-term debt of the Company decreased by $15.0 million during the year. Accounts payable and accrued expenses decreased by $1.5 million. Stockholders’ equity was $13.4 million, an increase of $8.5 million from the prior year due to the $3.6 million in net income generated by the Company in 2013 and $4.9 million in new equity raised through the Company’s private placement.

### Liquidity and Capital Resources

### Cash Requirements

On November 28, 2012 we entered into a Forbearance Agreement with our lender. The Forbearance Agreement, among other things, does not allow for additional draws on our revolving line of credit. We can apply for a separate forbearance line of credit, but approval by our lender is at their discretion. We prepare weekly cash forecasts for our own benefit and for submission to our lender. We anticipate that our current cash and the cash to be generated from collection of our receivables will be adequate for our cash needs.

### Sources and Uses of Cash

As of September 30, 2013, we had $6.2 million in cash, and working capital of $10.3 million, due in part to the $4.9 million equity raised in the Preferred Stock issuance. The maturities of the total long term debt are as follows:

|  |  |
| --- | ---: |
| 2014 | $15,413,225 |
| 2015 | 512,556 |
| 2016 | 250,085 |
| 2017 | 226,043 |
| 2018 | 56,165 |
| Thereafter | 13,871 |
| Total | $16,471,945 |

### Line of Credit

The Company has established an eighteen million ($18,000,000) Line of Credit agreement with a regional bank. The line of credit is subject to the terms of the Forbearance Agreement discussed above. Interest during the forbearance period is 6.5%, which expires May 31, 2014. Cash available under the line is calculated based on a percentage of the Company’s accounts receivable with certain exclusions. Major items excluded from calculation are certain percentages of receivables from bonded jobs and retainage as well as items greater than one hundred twenty (120) days old. At September 30, 2013 the Company had outstanding borrowings $9.9 million on the line of credit.

The debt covenants, under the line of credit, with respect to the Company’s current ratio and debt to tangible net worth have been waived under the Forbearance Agreement. The Company is in compliance with the remaining debt covenants at September 30, 2013.

In accordance with the terms of the Forbearance Agreement, the lender has agreed to forbear from exercising and enforcing its default-related rights under the notes.

### Off-Balance Sheet transactions

Due to the nature of our industry, we often enter into certain off-balance sheet arrangements in the ordinary course of business that result in risks not directly reflected in our balance sheets. Though for the most part not material in nature, some of these are:

### Leases

Our work often requires us to lease various facilities, equipment and vehicles. These leases usually are short term in nature, one year or less though at times we may enter into longer term leases when warranted. By leasing equipment, vehicles and facilities, we are able to reduce our capital outlay requirements for equipment vehicles and facilities that we may only need for short periods of time. The Company rented one piece of real estate from stockholders-directors of the Company under a long-term lease agreement. This agreement was for the Company’s headquarter offices and was rented from a corporation in which two of the Company’s directors are shareholders. The agreement, which called for $7,500 monthly rental payments, began November 1, 2008 and runs through October 31, 2013. The Company elected not to renew this lease but to instead combine the corporate headquarters with C.J. Hughes’ office in Huntington, WV. The Company also rents office and shop space from other independent lessors. The office space rental is $6,000 per month and extends to May 2014. The shop rental is $5,800 monthly and extends to May 2014.

### Letters of Credit

Certain of our customers or vendors may require letters of credit to secure payments that the vendors are making on our behalf or to secure payments to subcontractors, vendors, etc. on various customer projects. At September 30, 2013, the Company had one letter of credit outstanding in the amount of $953,340.

### Performance Bonds

Some customers, particularly new ones or governmental agencies, require us to post bid bonds, performance bonds and payment bonds. These bonds are obtained through insurance carriers and guarantee to the customer that we will perform under the terms of a contract and that we will pay subcontractors and vendors. If we fail to perform under a contract or to pay subcontractors and vendors, the customer may demand that the insurer make payments or provide services under the bond. We must reimburse the insurer for any expenses or outlays it is required to make. Effective October 19, 2012, the Company’s bonding company discontinued issuing the Company any new bonds until further notice. The Company is actively searching for a new bonding company, but has not found one as of September 30, 2013.

Depending upon the size and conditions of a particular contract, we may be required to post letters of credit or other collateral in favor of the insurer. Posting of these letters or other collateral will reduce our borrowing capabilities. Historically, the Company has never had a payment made by an insurer under these circumstances and does not anticipate any claims in the foreseeable future. At September 30, 2013, we had $16.7 million in performance bonds issued by the insurer outstanding.

### Concentration of Credit Risk

In the ordinary course of business the Company grants credit under normal payment terms, generally without collateral, to our customers, which include natural gas and oil companies, general contractors, and various commercial and industrial customers located within the United States. Consequently, we are subject to potential credit risk related to business and economic factors that would affect these companies. However, we generally have certain statutory lien rights with respect to services provided. Under certain circumstances such as foreclosure, we may take title to the underlying assets in lieu of cash in settlement of receivables. The Company had only two customers that exceeded ten percent of revenues or receivables for the year ended September 30, 2013. One customer represented 29.1% of revenues and 43.1% of accounts receivable. The other represented 11.2% of revenue and 8.4% of accounts receivable at September 30, 2013.

### Litigation

The Company is a party from time to time to various lawsuits, claims and other legal proceedings that arise in the ordinary course of business. These actions typically seek, among other things, compensation for alleged personal injury, breach of contract and/or property damages, punitive damages, civil penalties or other losses, or injunctive or declaratory relief. With respect to all such lawsuits, claims, and proceedings, we record reserves when it is probable that a liability has been incurred and the amount of loss can be reasonably estimated. We do not believe that any of these proceedings, separately or in aggregate, would be expected to have a material adverse effect on our financial position, results of operations or cash flows.

### Related Party Transactions

In the normal course of business, we enter into transactions from time to time with related parties. These transactions typically would not be material in nature and would usually relate to real estate, vehicle or equipment rentals.

### Inflation

Due to relatively low levels of inflation during the years ended September 30, 2013 and 2012, inflation did not have a significant effect on our results.

### New Accounting Pronouncements

In July 2012, the FASB issued Accounting Standards Update (ASU) No. 2012-02, *Intangibles--Goodwill and Other (Topic 350): Testing Indefinite-Lived Intangible Assets for Impairment.* This ASU states that an entity has the option first to assess qualitative factors to determine whether the existence of events and circumstances indicates that it is more likely than not that the indefinite-lived intangible asset is impaired. If, after assessing the totality of events and circumstances, an entity concludes that it is not more likely than not that the indefinite-lived intangible asset is impaired, then the entity is not required to take further action. However, if an entity concludes otherwise, then it is required to determine the fair value of the indefinite-lived intangible asset and perform the quantitative impairment test by comparing the fair value with the carrying amount in accordance with Codification Subtopic 350-30, *Intangibles--Goodwill and Other, General Intangibles Other than Goodwill.*

Under the guidance in this ASU, an entity also has the option to bypass the qualitative assessment for any indefinite-lived intangible asset in any period and proceed directly to performing the quantitative impairment test. An entity will be able to resume performing the qualitative assessment in any subsequent period. The amendments in this ASU are effective for annual and interim impairment tests performed for fiscal years beginning after September 15, 2012. Adoption of the new guidance, in itself, will not have an impact on the Company’s statements of income and financial position.

In February 2013, the FASB issued ASU 2013-02 “Comprehensive Income: Reporting of Amounts Reclassified Out of Accumulated Other Comprehensive Income.” This amendment does not change the current requirements for reporting net income or other comprehensive income in Financial Statements. These amendments require an entity to provide information about the amounts reclassified out of accumulated other comprehensive income by component. In addition, an entity is required to present, either on the face of the statement where net income is presented or in the notes, significant amounts reclassified out of accumulated other comprehensive income by the respective line items of net income but only if the amount reclassified is required under U.S. GAAP to be reclassified to net income in its entirety in the same reporting period. For other amounts that are not required under U.S. GAAP to be reclassified in their entirety to net income, an entity is required to cross reference to other disclosures required under U.S. GAAP that provide additional details about those amounts. We expect to adopt the new guidance beginning on October 1, 2014, and the adoption of the new guidance is not expected to impact our financial position, results of operations, comprehensive income or cash flows, other than the related disclosures to the extent applicable.

In April 2013, the FASB issued ASU 2013-07, “Presentation of Financial Statements: Topic Liquidation Basis of Accounting” (“ASU 2013-07”). ASU 2013-07 requires an entity to prepare its financial statements using the liquidation basis of accounting when liquidation is imminent. Liquidation is considered imminent when the likelihood is remote that the organization will return from liquidation and either: (a) a plan for liquidation is approved by the person or persons with the authority to make such a plan effective and the likelihood is remote that the execution of the plan will be blocked by other parties; or (b) a plan for liquidation is being imposed by other forces. ASU 2013-07 will be effective for the Company beginning on November 1, 2014. The Company expects that the adoption of ASU 2013-07 will not have a material impact on its financial statements or disclosure.

### Critical Accounting Policies

The discussion and analysis of the Company’s financial condition and results of operations are based on our consolidated financial statements, which have been prepared in accordance with accounting principles generally accepted in the United States. The preparation of these consolidated financial statements requires us to make estimates and assumptions that affect the reported amounts of assets and liabilities, disclosures of contingent assets and liabilities known to exist at the date of the consolidated financial statements and reported amounts of revenues and expenses during the reporting period. We evaluate our estimates on an ongoing basis, based on historical experience and on various other assumptions that are believed to be reasonable under the circumstances. There can be no assurance that actual results will not differ from those estimates. Management believes the following accounting policies affect our more significant judgments and estimates used in the preparation of our consolidated financial statements.

### Income Taxes

The Company and all subsidiaries file a consolidated federal and various state income tax returns on a fiscal year basis. With few exceptions, the Company is no longer subject to U.S. federal, state, or local income tax examinations for years ending prior to September 30, 2008.

The Company follows the liability method of accounting for income taxes in accordance with the Income Taxes topic of the FASB ASC. Under this method, deferred tax assets and liabilities are recorded for future tax consequences of temporary differences between financial reporting and tax bases of assets and liabilities, and are measured using the enacted tax rates and laws that are expected to be in effect when the underlying assets or liabilities are recovered or settled. A valuation allowance is established to reduce deferred tax assets if it is more likely than not that a portion of the deferred tax asset will not be realized. GAAP prescribes a comprehensive model for how companies should recognize, measure, present and disclose in their financial statements uncertain tax positions taken or to be taken on a tax return.

At September 30, 2013 the Company has a tax asset related to NOL carry forwards of $5.0 million and a valuation allowance against the NOL of $3.5 million. The net deferred tax asset on the Company’s balance sheet is $3.9 million. The amount considered more likely than not to be realized is based on management’s projection of future taxable income, including projected tax basis gain on the sale of the assets of S T Pipeline.

### Goodwill

The Company has selected July 1 as the date of the annual goodwill impairment evaluation, which is the first day of our fourth fiscal quarter. Goodwill was assigned to the operating units at the time of acquisition. The reporting units to which goodwill was assigned are CJ Hughes (“CJ”), Contractors Rental Corp (a subsidiary of CJ Hughes-“CRC”), Nitro Electric (a subsidiary of CJ Hughes-“Nitro”) and to ST Pipeline. The assignment to CJ consolidated and ST Pipeline was based on the purchase price of each company. Both purchases were supported by fairness opinions. The allocation of the goodwill arising from the purchase of CJ was allocated between CJ/CRC and Nitro based on an internally prepared analysis of the relative fair values of each unit.

There have been no material operational changes to any reporting units since the date of acquisition. Although the Company uses a centralized management approach, the reporting units have continued to perform similar services to those performed prior to the acquisition. There have been no sales of equipment, other than in the ordinary course of business, or dispositions of lines of business by any of the operating units.

A discounted cash flow model requires estimates and judgments about such factors as the projected free cash flows, weighted average cost of capital (WACC) and terminal value assumptions. Projected free cash flows require assumptions about projected revenues, profitability and capital expenditures. Significant assumptions relating to the pricing multiple or market approach to value include multiples of price and enterprise value to various metrics including earnings and cash flows. These estimates and judgments about the future can be difficult to predict with certainty, and changes in these assumptions may result in a different conclusion of fair value.

In the fourth fiscal quarter of 2012, the Company recorded a goodwill impairment charge of $36.9 million, which represented the entire amount of goodwill carried on the Company’s balance sheet. Step 2 of the goodwill impairment test indicated that there was no residual goodwill of the Company. The Company has determined that its operating units meet the criteria for aggregation and can be deemed a single reporting unit because of their similar economic characteristics. Therefore the goodwill impairment test was conducted at the Company level. See Note 4 of the Notes to the Consolidated Financial Statements.

### Revenue Recognition

Revenues from fixed price contracts are recognized using the percentage-of-completion method, measured by the percentage of costs incurred to date to total estimated costs at completion. These contracts provide for a fixed amount of revenues for the entire project. Such contracts provide that the customer accept completion of progress to date and compensate us the services rendered, measured in terms of units installed, hours expended or some other measure of progress. Contract costs include all direct material, labor and subcontract costs and those indirect costs related to contract performance, such as indirect labor, tools and expendables. The cost estimates are based on the professional knowledge and experience of the Company’s engineers, project managers and financial professionals. Changes in job performance, job conditions, and others all affect the total estimated costs at completion. The effects of these changes are recognized in the period in which they occur. Provisions for the total estimated losses on uncompleted contracts are made in the period in which such losses are determined. The current asset “Costs and estimated earnings in excess of billings on uncompleted contracts” represents revenues recognized in excess of amounts billed for fixed price contracts. The current liability “Billings in excess of costs and estimated earnings on uncompleted contracts” represents billings in excess of revenues recognized for fixed price contracts.

Revenue on all costs plus and time and material contracts are recognized when services are performed or when units are completed.

### Claims

Claims are amounts in excess of the agreed contract price that a contractor seeks to collect from customers or others for customer-caused delays, errors in specifications and designs, contract terminations, change orders in dispute or unapproved as to both scope and price, or other causes of unanticipated additional costs. The Company records revenue on claims that have a high probability of success. Revenue from a claim is recorded only to the extent that contract costs relating to the claim have been incurred.

### Self Insurance

The Company has its workers’ compensation, general liability and auto insurance through a captive insurance company. While the Company believes that this arrangement has been very beneficial in reducing and stabilizing insurance costs the Company does have to maintain a restricted cash account to guarantee payments of premiums. That restricted account had a balance of $1.4 million as of September 30, 2013. Should the captive experience severe losses over an extended period, it could have a detrimental effect on the Company.

### Current and Non-Current Accounts Receivable and Provision for Doubtful Accounts

The Company provides an allowance for doubtful accounts when collection of an account is considered doubtful. Inherent in the assessment of the allowance for doubtful accounts are certain judgments and estimates relating to, among others, our customer’s access to capital, our customer’s willingness or ability to pay, general economic conditions and the ongoing relationship with the customer. While most of our customers are large well capitalized companies, should they experience material changes in their revenues and cash flows or incur other difficulties and not be able to pay the amounts owed, this could cause reduced cash flows and losses in excess of our current reserves. At September 30, 2013, the management review deemed that the allowance for doubtful accounts was adequate.

### Outlook

The following statements are based on current expectations. These statements are forward looking, and actual results may differ materially.

Prior to the general economic crisis that severely impacted demand in 2009, our customers were experiencing high demands for their products, particularly natural gas. Currently, we are seeing the increased demand for our services and accordingly, we would expect to see projected spending for our customers on their transmission and distribution systems increasing dramatically over the next few years. However, with the current uncertainty in the economy the demand for the customer’s project could wane and also their ability to fund planned projects could be reduced. The Company’s backlog at September 30, 2013 was $52.6 million and while adding additional business projects appears likely, no assurances can be given that the Company will be successful in bidding on projects that become available. Moreover, even if the Company obtains contracts, there can be no guarantee that the projects will go forward.

The Company’s ability to complete the existing backlog and to obtain and perform additional work will be dependent on the Company complying with the terms of the Forbearance Agreement with our lender and finding alternative funding, possibly including an infusion of equity capital. See the “Liquidity and Capital Resources” section for further discussion.

## Market risk

As filed, 391 characters.

We are exposed to market risks, primarily related to increases in fuel prices and adverse changes in interest rates.

***Interest Rate***. Our exposure to market rate risk for changes in interest rates relates to our borrowings from banks. Some of our loans have variable interest rates. Accordingly, as rates rise, our interest cost would rise. We do not feel that this risk is significant.

## Controls and procedures

As filed, 4,340 characters.

### (a) Evaluation of Disclosure Controls and Procedures

Under the supervision and with the participation of our management, including our Chief Executive Officer and Chief Financial Officer, we evaluated the effectiveness of the design and operation of our disclosure controls and procedures (as defined in Rule 13a-15(e) under the Securities Exchange Act of 1934) as of the end of the period covered by this report. Based upon that evaluation, the Chief Executive Officer and Chief Financial Officer concluded that, as of the end of the period covered by this report, our disclosure controls and procedures were effective to ensure that information required to be disclosed in the reports that Energy Services of America Corporation files or submits under the Securities Exchange Act of 1934, is recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms.

### (b) Management’s Report on Internal Control over Financial Reporting

Management is responsible for establishing and maintaining adequate internal control over financial reporting for the Company. Internal control over financial reporting refers to the process designed by, or under the supervision of, our Chief Executive Officer and Chief Financial Officer, and effected by our Board of Directors, management and other personnel, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles, and includes those policies and procedures that:

(1) Pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the Company;

(2) Provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the Company are being made only in accordance with authorizations of management and directors of the Company; and

(3) Provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the Company’s assets that could have a material effect on the Company’s financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Management has used the framework set forth in the report entitled “Internal Control – Integrated Framework” published by the Committee of Sponsoring Organizations of the Treadway Commission to evaluate the effectiveness of the Company’s internal control over financial reporting. Management has not indentified any material weakness in the Company’s internal control over financial reporting. Management has concluded that the Company’s internal control over financial reporting was effective as of the end of the most recent fiscal year.

This Annual Report does not include an attestation report of the Company’s registered public accounting firm regarding internal control over financial reporting. Management’s report was not subject to attestation by the Company’s registered public accounting firm pursuant to rules of the SEC that permit the Company to provide only Management’s report in this Annual Report.

/s/ Douglas V. Reynolds

Douglas V. Reynolds

Chief Executive Officer

/s/ Charles P. Crimmel

Charles P. Crimmel

Chief Financial Officer

The report set forth under this Item 9A (b) shall not have been deemed filed for the purposes of Section 18 of the Exchange Act or otherwise subject to the liabilities of Section 18.

### (c) Changes in Internal Controls over Financial Reporting

There has been no change in Energy Services of America Corp.’s internal control over financial reporting during Energy Services of America Corporation’s fourth quarter of fiscal year 2013 that has materially affected, or is reasonably likely to materially affect, Energy Services of America Corporation’s internal control over financial reporting.