# Boeing Co: Form 10-Q for the period ended Mar 31, 2009

- Company: [Boeing Co](/companies/ba.md) (CIK 12927)
- Form: 10-Q
- Filed: 2009-04-22
- Accepted by EDGAR: Apr 22, 2009, 12:28 ET
- Period: 2009-03-31
- Accession: 0001193125-09-084313
- Inline XBRL: no
- Main document: https://www.sec.gov/Archives/edgar/data/12927/000119312509084313/d10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/12927/000119312509084313/

## Management's discussion and analysis

As filed, 48,987 characters.

### Consolidated Operating Results

The following table summarizes key indicators of consolidated results of operations:

*(Dollars in millions, except per share data)*

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| Revenues | **$16,502** | $15,990 |
| Earnings from operations | **$1,025** | $1,799 |
| Operating margins | **6.2%** | 11.3% |
| Effective income tax rate | **34.0%** | 34.9% |
| Net earnings from continuing operations | **$615** | $1,206 |
| Diluted earnings per share | **$0.86** | $1.62 |

*(Dollars in millions)*

|  | March 31 2009 | December 31 2008 |
| --- | ---: | ---: |
| Contractual backlog | **$314,718** | $323,860 |
| Unobligated backlog | **24,734** | 28,165 |

### Revenues

The following table summarizes revenues:

*(Dollars in millions)*

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| Commercial Airplanes | **$8,554** | $8,161 |
| Integrated Defense Systems | **7,720** | 7,575 |
| Boeing Capital Corporation | **163** | 185 |
| Other | **39** | 75 |
| Unallocated items and eliminations | **26** | (6) |
| Revenues | **$16,502** | $15,990 |

Revenues for the three months ended March 31, 2009 grew $512 million, a 3% increase compared with the same period in 2008. Commercial Airplanes revenues increased by $393 million a 5% increase, due to higher new airplane deliveries partially offset by decreased commercial aviation support business. Integrated Defense Systems (IDS) revenues increased by $145 million due to increased volume in Global Services and Support (GS&S), more than offsetting decreases in Boeing Military Aircraft (BMA) and Network and Space Systems (N&SS). Boeing Capital Corporation (BCC) revenues decreased by $22 million primarily due to a decrease in the customer financing portfolio.

### Earnings from Operations

The following table summarizes earnings from operations:

*(Dollars in millions)*

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| Commercial Airplanes | **$417** | $983 |
| Integrated Defense Systems | **709** | 860 |
| Boeing Capital Corporation | **37** | 61 |
| Other | **(23)** | (50) |
| Unallocated items and eliminations | **(115)** | (55) |
| Earnings from operations | **$1,025** | $1,799 |

Operating earnings for the three months ended March 31, 2009 decreased by $774 million compared with the same period in 2008. Commercial Airplanes earnings decreased by $566 million compared with the same period in 2008 as the reach forward loss on the 747 program grew by $347 million and margins were reduced on other programs, both primarily due to lower projected delivery pricing on all programs associated with lower industry escalation indices and lower planned future production rates on several programs, somewhat offset by refined cost estimates. Increased research and development expense and higher infrastructure costs allocations related to 2008 schedule delays and strike also contributed to Commercial Airplanes earnings decrease. IDS earnings decreased by $151 million compared with the same period in 2008 primarily due to lower earnings in the BMA and N&SS segments offsetting GS&S earnings growth. BCC operating earnings decreased $24 million due to lower revenues, higher impairment expense and a provision for losses partially offset by lower interest expense.

The most significant expense items not allocated to segments are shown in the table below.

*(Dollars in millions)*

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| Pension | **$23** | $(67) |
| Postretirement | **(23)** | (20) |
| Share-based plans | **(57)** | (30) |
| Deferred compensation | **23** | 61 |
| Other unallocated items and eliminations | **(81)** | 1 |
| Total | **$(115)** | $(55) |

Other unallocated items and eliminations expense increased by $82 million in 2009 primarily due to timing of intercompany expense allocations and elimination of profit on intercompany items.

Unallocated pension and other postretirement expense represents the difference between costs recognized under Generally Accepted Accounting Principles in the consolidated financial statements and federal cost accounting standards required to be utilized by our business segments for U.S. government contracting purposes.

We recorded net periodic benefit cost related to pensions and other postretirement benefits of $454 million and $283 million for the three months ended March 31, 2009 and 2008. The increase was primarily due to higher amortization pension actuarial losses. Not all net periodic benefit cost is recognized in earnings in the period incurred because it is allocated to production as product costs and a portion remains in inventory at the end of the reporting period. A portion of pension and other postretirement expense is recorded in the business segments and the remainder is included in unallocated pension and other postretirement expense.

Earnings from operations included the following amounts allocated to business segments and Other unallocated items and eliminations.

*(Dollars in millions)*

| Three months ended March 31, | Pension 2009 | 2008 | Other Postretirement Benefits 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Net periodic benefit costs allocated to business segments | **$(242)** | $(124) | **$(134)** | $(117) |
| Net periodic benefit costs in Other unallocated items and eliminations | **23** | (67) | **(23)** | (20) |
| Net periodic benefit cost included in Earnings from operations | **$(219)** | $(191) | **$(157)** | $(137) |

### Other Earnings Items

*(Dollars in millions)*

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| **Earnings from operations** | **$1,025** | $1,799 |
| Other (loss)/income, net | **(36)** | 100 |
| Interest and debt expense | **(57)** | (46) |
| **Earnings before income taxes** | **932** | 1,853 |
| Income tax expense | **(317)** | (647) |
| **Net earnings from continuing operations** | **$615** | $1,206 |

Other income for the three months ended March 31, 2009 decreased $136 million compared with the same period in 2008 primarily driven by a reduction in investment income of approximately $100 million.

The effective tax rates were 34.0% and 34.9% for the three months ended March 31, 2009 and 2008. The first quarter 2009 tax provision reflects a projected 2009 annual tax rate of 31.0% and discrete first quarter 2009 charges of $27 million. The first quarter 2008 tax provision was based on an estimated 2008 annual tax rate of 35.2% and discrete first quarter 2008 benefits of $5 million. The decrease in the annual effective tax rate as compared with the prior year was primarily due to Research and Development tax credit benefits that exist in 2009, but did not exist in the first quarter of 2008, partially offset by a reduction in deferred tax assets resulting from lower projected state income tax rates due to legislative changes enacted in the first quarter of 2009.

For additional discussion related to Income Taxes see Note 3.

### Backlog

Contractual backlog of unfilled orders excludes purchase options, announced orders for which definitive contracts have not been executed and unobligated U.S. and non-U.S. government contract funding. The decrease in contractual backlog during the three months ended March 31, 2009 was primarily due to deliveries in excess of orders for our 737, 747, 767 and 777 programs, changes in projected revenue escalation and cancellations of 787 orders.

Unobligated backlog includes U.S. and foreign government definitive contracts for which funding has not been authorized. The decrease in unobligated backlog during the three months ended March 31, 2009 is primarily due to funding of existing multi-year contracts including the V-22, Future Combat Systems (FCS) and Chinook programs.

### Segment Results of Operations

### Commercial Airplanes

### Business Environment and Trends

The world economy grew at an average 3.5% annual rate between 2004 and 2008 compared with the long-term trend rate of 3.2%. The global economy is now forecasted to contract in 2009.

The air transport industry incurred estimated losses of $8.5 billion in 2008 and is estimated to incur $4.7 billion of losses in 2009. Given recent financial market volatility and economic impacts, the near-term profit outlook for global airlines is uncertain. Forecasted airline losses in 2009 are concentrated outside the United States. Approximately 90% of our Commercial Airplanes’ backlog is destined for non-U.S. airlines.

Air cargo traffic is currently contracting. Air cargo traffic declined approximately 20% in the fourth quarter of 2008. Early 2009 reports show this rate continuing and even accelerating for some carriers. World trade in 2009 is forecasted to decline for the first time since 1982 indicating continued near-term contraction and suggesting that air cargo will contract for the second straight year in 2009.

These conditions may cause customers to request cancellations, modifications, or rescheduling of their existing orders to meet revised fleet plans. Whether such requests will result in a material adverse impact on our earnings, cash flow or financial position depends on a number of factors including whether the request is granted, the type of aircraft, how much compensation is paid to us for costs already incurred and our ability to reschedule other orders to replace those canceled, modified, or rescheduled.

In April 2009, we announced a plan to reduce production rates on the 777 and to delay planned increases to 747 and 767 production rates in response to requests from customers. These changes are not expected to affect 2009 revenues but did reduce margins on airplane programs and increased the reach-forward loss on the 747 program. Separately, changes in escalation price indices during the three months ended March 31, 2009 also reduced margins on all programs and increased the reach-forward loss on the 747 program. The reduction in escalation indices had the effect of lowering estimated revenues for deliveries after 2009. The escalation indices are driven by commodity and other inflation price indices and could remain volatile in the current economic environment.

### Operating Results

*(Dollars in millions)*

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| Revenues | **$8,554** | $8,161 |
| Earnings from operations | **$417** | $983 |
| Operating margins | **4.9%** | 12.0% |

*(Dollars in millions)*

|  | March 31 2009 | December 31 2008 |
| --- | ---: | ---: |
| Contractual backlog | **$266,023** | $278,575 |

28

### Revenues

Year over year changes in Revenue are shown in the following table:

*(Dollars in millions)*

|  | Three months ended March 31, 2009 vs March 31, 2008 |
| --- | ---: |
| New airplane sales | $602 |
| Commercial aviation services business | (203) |
| Other | (6) |
| Total | $393 |

Revenues for the three months ended March 31, 2009 increased by $393 million compared with the same period of 2008. This increase in revenue was primarily attributable to higher new airplane deliveries. The decrease in revenues from commercial aviation services business was driven by decreased passenger to freighter conversions.

Commercial jet aircraft deliveries, including intercompany deliveries were as follows:

|  |  |  |  |  |  |
| --- | ---: | ---: | ---: | ---: | ---: |
| **Program** | **737** | **747** | **767** | **777** | **Total** |
| Cumulative deliveries as of 3/31/2009 | 2,847 | 1,414 | 972 | 771 |  |
| Deliveries during the first quarter of 2009 | 91 | 4 | 3 | 23 | 121 |
| Cumulative deliveries as of 12/31/2008 | 2,756 | 1,410 | 969 | 748 |  |
| Deliveries during the first quarter of 2008 | 87 | 4 | 3 | 21 | 115 |

### Earnings from Operations

Earnings from operations for the three months ended March 31, 2009 decreased by $566 million and operating margins decreased by 7.1 percentage points to 4.9% compared with the same period of 2008. The reach forward loss on the 747 program grew by $347 million and margins were reduced on other programs, both primarily due to lower projected delivery pricing associated with the lower industry escalation indices and lower planned future production rates on the 747, 767 and 777 programs, somewhat offset by refined cost estimates. The escalation and production rate impact, together with warranty and other expenses drove reduced earnings on other programs of $135 million. Higher infrastructure cost allocations related to the 787 and 747-8 schedule delays announced in 2008 and infrastructure costs incurred during the 2008 IAM strike reduced earnings by $115 million. Lower commercial aviation services volume primarily due to fewer passenger to freighter conversions reduced earnings by $69 million. A $78 million increase in research and development costs was primarily due to lower supplier cost sharing payments. These decreases were offset by increased earnings of $178 million from new airplane deliveries.

### Backlog

The decrease in contractual backlog during the three months ended March 31, 2009 compared with December 31, 2008 was due to deliveries in excess of orders for our 737, 747, 767 and 777 programs, changes in projected revenue escalation and cancellations of 787 orders.

A number of our customers may have contractual remedies that may be implicated by program delays. We continue to address customer claims and requests for other contractual relief as they arise. However, once orders are included in firm backlog, orders remain in backlog until canceled or fulfilled, although the value of orders is adjusted based upon changing revenue escalation assumptions and as changes to price and schedule are agreed to with customers.

### Accounting Quantity

The accounting quantities, undelivered units under firm orders and percentage of anticipated orders included in the program accounting estimates as compared with the number of cumulative firm orders were as follows:

|  | Program |  |  |  |  |
| --- | ---: | ---: | ---: | ---: | ---: |
| **As of 3/31/2009** | **737** | **747** | **767** | **777** | **787** |
| Program accounting quantities | **4,200** | **1,499** | **1,023** | **1,050** | **\*** |
| Undelivered units under firm orders1 | **2,203** | **110** | **67** | **331** | **878** |
| Cumulative firm orders2 | **5,050** | **1,524** | **1,039** | **1,102** |  |
|  | Program |  |  |  |  |
| **As of 12/31/2008** | 737 | 747 | 767 | 777 | 787 |
| Program accounting quantities | 4,200 | 1,499 | 1,023 | 1,050 | \* |
| Undelivered units under firm orders1 | 2,270 | 114 | 70 | 350 | 910 |
| Cumulative firm orders2 | 5,026 | 1,524 | 1,039 | 1,098 |  |

\* The accounting quantity for the 787 program will be determined in the year of first airplane delivery, targeted for 2010.

1 Undelivered units are not adjusted for cancellations subsequent to March 31, 2009 and December 31, 2008.

2 Cumulative firm orders represent the cumulative number of commercial jet aircraft deliveries plus undelivered firm orders.

**737 Program** There was no change in the accounting quantity for the 737 program during the three months ended March 31, 2009.

**747 Program** There was no change in the accounting quantity for the 747 program during the three months ended March 31, 2009. In the third quarter of 2008, we increased our cost estimates to incorporate the anticipated schedule delay and design changes and reduced margins on the 747 program to zero. We experienced further cost growth in the fourth quarter of 2008 and recorded a charge of $685 million to recognize a reach-forward loss. The charge was primarily related to higher than anticipated costs due to late changes to wing design which drove new load requirements into the fuselage and created other statement of work changes for our suppliers. Design and load changes also reduced commonality with the 747-400 and resulted in increased costs for components and systems. Higher pension costs, infrastructure cost shifts, delays in transitioning certain components to suppliers and higher internal production costs also increased cost estimates. During the first quarter of 2009, an additional charge of $347 million was recorded. This charge was primarily caused by a reduction in projected delivery price increases associated with escalation and production rate changes. Delivery of the first 747-8 Freighter is targeted for the third quarter of 2010. Targeted delivery of the 747-8 Intercontinental has moved from the second quarter of 2011 to the fourth quarter of 2011. A gap between when the last 747-400 is produced and the first 747-8 is delivered will contribute to lower 747 program revenues until deliveries of the 747-8 begin. We believe that the cost and revenue estimates incorporated in the financial statements are appropriate; however, this remains a development program, with the associated inherent risks.

**767 Program** There was no change in the accounting quantity for the 767 program during the three months ended March 31, 2009. In April 2009, we announced a delay in previous plans to increase production.

**777 Program** There was no change in the accounting quantity for the 777 program during the three months ended March 31, 2009. Delivery of the first 777 Freighter occurred in February 2009. In April 2009, we announced that we will lower the production rate on our 777 airplane program, affecting deliveries beginning in June 2010.

**787 Program** We are in the final stages of assembly of the initial airplanes and planning for flight test. The risks that are always inherent in the latter stages of new airplane program production remain. We continue to address challenges associated with assembly of the first few airplanes, including management of our extended global supply chain, completion and integration of traveled work, weight and systems integration. We are also continuing efforts to satisfy customer mission and performance needs in light of the anticipated weight of their respective aircraft. First flight of the 787-8 is targeted for the second quarter of 2009 with delivery in the first quarter of 2010. The schedule reflects the cumulative impacts of disruption caused by the 2008 IAM strike, the requirement to replace certain fasteners in early production airplanes, as well as the impact from the challenges mentioned above. We continue to work with our customers and suppliers to assess the specific impacts of schedule changes, including delivery delays and supplier assertions associated with such changes. A number of our customers have contractual remedies that may be implicated by our revised plan for the 787. We continue to address customer claims and requests for other contractual relief as they arise.

### Additional Considerations

In 2008, we announced delays and challenges on the 787 and 747-8 programs. In addition, we recorded reach-forward losses on the 747 program in 2008 and 2009. These events highlight the risks that are always inherent in new airplane programs and new derivative airplanes. Costs related to development of new programs and derivative airplanes are generally expensed as incurred. Costs to produce new aircraft are included in inventory and accounted for using program accounting. Airplane programs have risk for reach-forward losses if our estimated production costs exceed our estimated program revenues for the accounting quantity. Generally commercial airplanes are sold on a firm fixed-price basis with an indexed price escalation clause and are often sold several years before scheduled delivery. Each customer purchase agreement contains an escalation clause to account for the effects of economic fluctuations over the period of time from airplane sale to airplane delivery. A price escalation formula based on pre-defined factors is used to determine the final price of the airplane at the time of customer delivery. While firm fixed-price contracts allow us to benefit from cost savings, they also expose us to the risk of cost overruns. Many new airplanes and derivatives have highly complex designs and require extensive coordination and integration with supplier partners. As technical or quality issues arise, we may experience schedule delays and higher costs to complete new programs and derivative aircraft. Additionally, price escalation factors may also impact margins by reducing the estimated price of airplanes delivered in the future. Both of these factors may ultimately result in a material charge if the program has or is determined to have a reach forward loss. Changes to estimates of the program accounting quantity, production costs and rates, learning curve, costs of derivatives, customer negotiations/settlements, supplier claims and certification issues could also result in lower margins or reach-forward losses. While we believe the cost and revenue estimates incorporated in the financial statements are appropriate, the technical complexity of these programs creates financial risk as additional completion costs may become necessary or scheduled delivery dates could be extended, which could trigger termination provisions, order cancellations or other financially significant exposure.

### Integrated Defense Systems

### Business Environment and Trends

In April 2009, the U.S. Department of Defense announced changes it is recommending for inclusion in the fiscal year 2010 budget that the White House submits to Congress. These changes if included in the budget and then approved by Congress could reduce future funding for a number of our programs including C-17, FCS, and F-22 Raptor. We will continue to evaluate the defense budget as it progresses through Congress.

### IDS Realignment

Effective January 1, 2009, certain programs were realigned between IDS segments. Business segment data for all periods presented have been adjusted to reflect the realignment. See Note 13.

### Operating Results

*(Dollars in millions)*

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| Revenues | **$7,720** | $7,575 |
| Earnings from operations | **$709** | $860 |
| Operating margins | **9.2%** | 11.4% |

*(Dollars in millions)*

|  | March 31 2009 | December 31 2008 |
| --- | ---: | ---: |
| Contractual backlog | **$48,695** | $45,285 |
| Unobligated backlog | **24,312** | 27,719 |

### Revenues

IDS revenues for the three months ended March 31, 2009 increased by $145 million, a 2% increase from the same period in 2008. The increase was due to increased volume in GS&S, offset by decreases in BMA and N&SS.

### Earnings from Operations

IDS operating earnings for the three months ended March 31, 2009 decreased $151 million and operating margins decreased 2.2% to 9.2% when compared to the same period in 2008. The decreased margin was due to lower margins in all three segments.

### Backlog

IDS total backlog was $73,007 million at March 31, 2009, virtually unchanged from $73,004 million at December 31, 2008.

For further details on the changes between periods, refer to the discussions of the individual segments below.

### Additional Considerations

Our business includes a variety of development programs which have complex design and technical challenges. Many of these programs have cost-type contracting arrangements. In these cases the associated financial risks are primarily in lower profit rates or program cancellation if milestones and technical progress are not accomplished. Examples of these programs include Airborne Laser, EA-18G, Family of Beyond Line-of-Sight Terminals, FCS, Ground-based Midcourse Defense (GMD), Joint Tactical Radio System, P-8A and Proprietary programs.

Some of our development programs are contracted on a fixed-price basis. Many of these programs have highly complex designs. As technical or quality issues arise, we may experience schedule delays and cost impacts, which could increase our estimated cost to perform the work or reduce our estimated price, either of which could result in a material charge. These programs are ongoing, and while we believe the cost and fee estimates incorporated in the financial statements are appropriate, the technical complexity of these programs creates financial risk as additional completion costs may become necessary or scheduled delivery dates could be extended, which could trigger termination provisions, the loss of satellite in-orbit incentive payments, or other financially significant exposure. These programs have risk for reach-forward losses if our estimated costs exceed our estimated contract revenues. Examples of these programs include Airborne Early Warning and Control (AEW&C), International KC-767 Tanker, commercial and military satellites, Vigilare and High Frequency Modernisation.

### Boeing Military Aircraft

### Operating Results

*(Dollars in millions)*

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| Revenues | **$3,010** | $3,202 |
| Earnings from operations | **$282** | $384 |
| Operating margins | **9.4%** | 12.0% |

*(Dollars in millions)*

|  | March 31 2009 | December 31 2008 |
| --- | ---: | ---: |
| Contractual backlog | **$28,157** | $25,710 |
| Unobligated backlog | **8,274** | 10,048 |

### Revenues

BMA revenues for the three months ended March 31, 2009 decreased by $192 million, a 6% decrease compared with the same period in 2008. The decrease is due to one less International KC-767 Tanker delivery in 2009 compared to 2008, a change in delivery mix, and lower volume on several global strike aircraft and weapons programs partially offset by higher rotorcraft deliveries.

Deliveries of units for new-build production aircraft, excluding remanufactures and modifications, were as follows:

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| F/A-18 Models | **10** | 10 |
| T-45TS Goshawk | **2** | 1 |
| F-15E Eagle | **4** | 4 |
| C-17 Globemaster | **3** | 3 |
| KC-767 Tanker | **1** | 2 |
| AH-64 Apache | **5** |  |
| CH-47 Chinook |  | 2 |
| Total new-build production aircraft | **25** | 22 |

### Earnings from Operations

BMA operating earnings for the three months ended March 31, 2009 decreased by $102 million, a 27% decrease from the same period in 2008. The decrease is primarily due to lower volume and a change in delivery mix.

### Backlog

BMA total backlog was $36,431 million at March 31, 2009, an increase of 2% from December 31, 2008, primarily due to the U.S. Air Force (USAF) order for 15 C-17 aircraft.

### Additional Considerations

Items which could have a future impact on BMA operations include the following:

**AEW&C** During 2006, we recorded charges of $770 million and during the second quarter of 2008, we recorded a charge of $248 million related to revised cost and revenue estimates to complete the AEW&C programs in Australia and Turkey. The 2008 charge, primarily related to our program in Australia, was due to subsystem development issues on the electronic warfare and ground support systems and the additional time required for integration testing. These factors required a revised delivery schedule for the Australian aircraft. These delays are not expected to affect delivery schedules to our other AEW&C customers. The AEW&C development program, also known as Wedgetail in Australia, Peace Eagle in Turkey and Peace Eye in the Republic of Korea, consists of a 737-700 aircraft outfitted with a variety of command and control and advanced radar systems, some of which have never been installed on an airplane before. Wedgetail includes six aircraft and Peace Eagle and Peace Eye include four aircraft each. These are advanced and complex fixed-price development programs involving technical challenges at the individual subsystem level and in the overall integration of these subsystems into a reliable and effective operational capability. We believe that the cost and revenue estimates incorporated in the financial statements are appropriate; however, the technical complexity of the programs creates financial risk as additional completion costs may be necessary or scheduled delivery dates could be delayed.

**International KC-767 Tanker Program** During 2008 and 2007, the BMA segment recorded charges of $85 million and $152 million related to this program. The 2007 charge was partially offset at the consolidated level. The International KC-767 Tanker program includes four aircraft for the Italian Air Force and four aircraft for the Japanese Air Self Defense Force. As of March 31, 2009, we delivered three tankers to Japan. These programs are ongoing, and while we believe the revenue and cost estimates incorporated in the financial statements are appropriate, the technical complexity of the programs creates financial risk as additional completion and development costs may be necessary or remaining scheduled delivery dates could be delayed.

**C-17** As of March 31, 2009, we delivered 185 of the 205 C-17 aircraft ordered by the USAF, with final deliveries scheduled for 2010. The 205 C-17 aircraft total includes the Fiscal Year 2008 order for 15 aircraft that the USAF placed on contract in February 2009. Our backlog at March 31, 2009 also includes international orders for 2 C-17 aircraft. In April 2008, we directed key suppliers to begin work on 15 aircraft beyond the 205 to support potential Fiscal Year 2009 (FY09) orders and anticipated international orders. The National Defense Authorization Act signed into law by the previous administration authorizes the procurement of six C-17s in FY09. However, funding would need to be addressed in a future defense appropriations bill and decisions regarding the government’s need for additional C-17s beyond the 205 ordered have yet to be made. There continues to be substantial interest in purchasing additional C-17 aircraft from international customers. Inventory expenditures and potential termination liabilities to suppliers totaled approximately $180 million at March 31, 2009. Should additional orders not materialize, it is reasonably possible that we will decide in 2009 to complete production of the C-17. We are still evaluating the full financial impact of a potential production shut-down, including any recovery that would be available from the government. Such recovery from the government would not include the costs incurred by us resulting from our direction to suppliers to begin working on aircraft beyond the 205 ordered by the USAF.

### Network and Space Systems

### Operating Results

*(Dollars in millions)*

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| Revenues | **$2,678** | $2,694 |
| Earnings from operations | **$207** | $267 |
| Operating margins | **7.7%** | 9.9% |

*(Dollars in millions)*

|  | March 31 2009 | December 31 2008 |
| --- | ---: | ---: |
| Contractual backlog | **$8,907** | $8,868 |
| Unobligated backlog | **15,267** | 16,981 |

### Revenues

N&SS revenues for the three months ended March 31, 2009 decreased by $16 million, a decrease of less than 1% compared with the same period in 2008

### Earnings from Operations

N&SS operating earnings for the three months ended March 31, 2009 decreased by $60 million, a 22% decrease compared with the same period in 2008. The decrease is partially due to a favorable settlement in 2008 on a civil satellite program and lower earnings on our ULA joint venture in 2009.

### Backlog

N&SS total backlog was $24,174 million at March 31, 2009, a decrease of 6% from December 31, 2008 primarily due to revenues recognized on FCS and GMD programs.

### Additional Considerations

Items which could have a future impact on N&SS operations include the following:

**United Launch Alliance** On December 1, 2006, we completed the transaction with Lockheed Martin Corporation (Lockheed) to create a 50/50 joint venture named United Launch Alliance L.L.C. (ULA). ULA combines the production, engineering, test and launch operations associated with U.S. government launches of Boeing Delta and Lockheed Atlas rockets. In connection with the transaction, we initially contributed net assets of $914 million at December 1, 2006. The book value of our investment exceeds our proportionate share of ULA’s net assets. This difference will be expensed ratably in future years. Based on the adjusted contributions and the conformed accounting policies established by ULA, this amortization is expected to be approximately $15 million annually for the next 15 years.

In connection with the formation of ULA, we and Lockheed each committed to provide up to $25 million in additional capital contributions through June 2009 and we each have agreed to extend a line of credit to ULA of up to $200 million to support its working capital requirements during the 5 year period following December 1, 2006. We and Lockheed transferred performance responsibility for certain U.S. government contracts to ULA as of the closing date. We and Lockheed agreed to jointly guarantee the performance of those contracts to the extent required by the U.S. government. We and Lockheed have also each committed to provide ULA with up to $100 million of additional capital contributions in the event ULA does not have sufficient funds to make a required payment to us under an inventory supply agreement. See Note 4.

We agreed to indemnify ULA through December 31, 2020 against potential non-recoverability of $1,360 million of Boeing Delta inventories included in contributed assets plus $1,860 million of inventory subject to an inventory supply agreement which ends on March 31, 2021. Since inception, ULA has sold $781 million of inventories that were contributed by us. As part of its integration, ULA is continuing to assess the future of the Delta II program beyond what is currently on contract. In the event ULA is unable to sell additional Delta II inventory, earnings could be reduced by up to $90 million.

We agreed to indemnify ULA in the event ULA is unable to obtain re-pricing of certain contracts which we contributed to ULA and to which we believe ULA is entitled. We will be responsible for any shortfall and may record up to $388 million in pre-tax losses related to these contracts.

**Sea Launch** The Sea Launch venture, in which we are a 40% partner, provides ocean-based launch services to commercial satellite customers.

We issued credit guarantees to creditors of the Sea Launch venture to assist it in obtaining financing and other support. In the event we are required to perform on these guarantees, we believe we can recover a portion of the cost (estimated at $271 million) through guarantees from the other venture partners. We have also made loans directly to Sea Launch in the past. In the event that Sea Launch is unable to repay those loans, we believe we can recover a portion of the cost (estimated at $206 million) from the other venture partners. The components of this exposure are as follows:

*(Dollars in millions)*

|  | Estimated Maximum Exposure | Established Reserves | Estimated Proceeds from Recourse | Estimated Net Exposure |
| --- | ---: | ---: | ---: | ---: |
| Credit guarantees | $451 | $180 | $271 |  |
| Partner loans (principal and interest) | 516 | 310 | 206 |  |
| Trade receivable from Sea Launch | 393 | 393 |  |  |
| Subcontract termination | 10 |  |  | $10 |
| Other receivables and Inventory | 68 | 41 |  | 27 |
|  | **$1,438** | **$924** | **$477** | **$37** |

The venture has incurred losses during the quarter ended March 31, 2009, and the year ended December 31, 2008 and continues to operate in a challenging business environment. During the quarter ended March 31, 2009, an arbitration panel issued a final award of approximately $52 million to a Sea Launch customer in connection with a terminated launch contract. The terms of payment of the award are being discussed.

We made no cash capital contributions to the Sea Launch venture during the quarter ended March 31, 2009 and we are not obligated to provide any further financial support to the venture. However, in the event that we do extend additional financial support to Sea Launch in the future, we will recognize losses associated with any such financial support as appropriate. Approximately $250 million of Sea Launch’s bank loans mature during the second quarter of 2009. In connection with a possible refinancing of this amount, Boeing will likely be called upon to renew its credit guarantee to Sea Launch lenders. If Sea Launch is unable to repay this amount or obtain refinancing, Boeing may be required to perform on the existing credit guarantee. The failure to repay or refinance this amount would cause a cross default under Sea Launch’s other external debt of approximately $200 million.

In the event Sea Launch is unable to refinance its debt or meet its other obligations and we are unable to recover the estimated proceeds from recourse to the other venture partners, we could be required to pay up to $451 million under credit guarantees, which could result in charges of up to $514 million.

We continue to look at alternatives to address funding requirements for the venture.

**Satellites** See the discussions of Boeing Satellite Systems International, Inc. (BSSI) in Note 12 Legal Proceedings.

### Global Services and Support

### Operating Results

*(Dollars in millions)*

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| Revenues | **$2,032** | $1,679 |
| Earnings from operations | **$220** | $209 |
| Operating margins | **10.8%** | 12.4% |

*(Dollars in millions)*

|  | March 31 2009 | December 31 2008 |
| --- | ---: | ---: |
| Contractual backlog | **$11,631** | $10,707 |
| Unobligated backlog | **771** | 690 |

### Revenues

GS&S revenues for the three months ended March 31, 2009 increased by $353 million, a 21% increase compared with the same period in 2008. The increase was due to increased volume in the Integrated Logistics (IL), Training Systems and Services, and the Maintenance, Modifications and Upgrades divisions.

### Earnings from Operations

GS&S operating earnings for the three months ended March 31, 2009 increased $11 million when compared with the same period in 2008 reflecting higher revenues partially offset by lower operating margins. Lower operating margins on several programs in the IL division and changes in the contract mix reduced the overall GS&S margin by 1.6% to 10.8%.

### Backlog

GS&S total backlog was $12,402 million at March 31, 2009, an increase of 9% from December 31, 2008, primarily due to increases in IL and International Business Operations.

### Boeing Capital Corporation

### Operating Results

*(Dollars in millions)*

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| Revenues | **$163** | $185 |
| Earnings from operations | **$37** | $61 |
| Operating margins | **23%** | 33% |

### Revenues

BCC segment revenues consist principally of lease income from equipment under operating lease and interest from financing receivables and notes. BCC’s revenues for the three months ended March 31, 2009, decreased $22 million when compared with the same period in 2008 primarily due to lower operating lease income resulting from a smaller portfolio of equipment under operating leases.

### Operating Earnings

BCC’s operating earnings are presented net of interest expense, provision for (recovery of) losses, asset impairment expense, depreciation on leased equipment and other operating expenses. Operating earnings for the three months ended March 31, 2009 decreased by $24 million due to lower revenues, higher impairment expense and a provision for losses partially offset by lower interest expense.

### Financial Position

The following table presents selected financial data for BCC:

*(Dollars in millions)*

|  | March 31 2009 | December 31 2008 |
| --- | ---: | ---: |
| BCC customer financing and investment portfolio | **$6,014** | $6,023 |
| Valuation allowance as a % of total receivables | **2.2%** | 2.1% |
| Debt | **$3,580** | $3,652 |
| Debt-to-equity ratio | **5.0-to-1** | 5.0-to-1 |

BCC’s customer financing and investment portfolio at March 31, 2009 decreased from December 31, 2008 due to normal portfolio run-off partially offset by the origination of notes receivable. At March 31, 2009 and December 31, 2008, BCC had $584 million and $685 million of assets that were held for sale or re-lease, of which $577 million and $305 million had firm contracts to be sold or placed on lease. In March 2009, Mexicana Group committed to lease 25 717 aircraft, including two of which were placed on lease and 14 that were held for sale or re-lease at March 2009. Additionally, aircraft subject to leases with a carrying value of approximately $269 million are scheduled to be returned off lease in the next 12 months. These aircraft are being remarketed or the leases are being extended and $63 million of these aircraft were committed at March 31, 2009.

### Restructurings and Restructuring Requests

At March 31, 2009, BCC had received a number of requests from both domestic and foreign airlines to reduce lease or rental payments or to otherwise restructure obligations. Whether such requests will result in a material adverse impact on our earnings, cash flow or financial position depends on a number of factors including whether the request is granted, the type of aircraft, the collateral value and market rental rates of the returned aircraft.

### Other Segment

*(Dollars in millions)*

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| Revenues | **$39** | $75 |
| Earnings from operations | **(23)** | (50) |

Revenues for the three months ended March 31, 2009 decreased by $36 million compared with the same period of 2008 primarily due to the sale of a C-17 aircraft in 2008 held under operating lease. Other segment losses for three months ended March 31, 2009 decreased by $27 million compared with the same period of 2008 primarily due to lower unallocated costs for certain shared services.

### Liquidity and Capital Resources

### Cash Flow Summary

*(Dollars in millions)*

|  | Three months ended March 31 2009 | 2008 |
| --- | ---: | ---: |
| Net earnings | **$610** | $1,211 |
| Non-cash items | **545** | 408 |
| Changes in working capital | **(962)** | 314 |
| Net cash provided by operating activities | **193** | 1,933 |
| Net cash (used)/provided by investing activities | **(598)** | 137 |
| Net cash provided/(used) by financing activities | **1,391** | (1,433) |
| Effect of exchange rate changes on cash and cash equivalents | **(17)** | 28 |
| Net increase in cash and cash equivalents | **969** | 665 |
| Cash and cash equivalents at beginning of year | **3,268** | 7,042 |
| Cash and cash equivalents at end of period | **$4,237** | $7,707 |

**Operating Activities** Net cash provided by operating activities decreased by $1,740 million to $193 million during the three months ended March 31, 2009, primarily due to lower earnings and higher net working capital in 2009. The net working capital increase was driven by decreases in customer advances for commercial aircraft and an increase in receivables from our U.S. government customers. In the corresponding period in 2008, we contributed $506 million to our U.S. pension plans.

**Investing Activities** Cash used by investing activities totaled $598 million during the three months ended March 31, 2009 compared with $137 million provided during the same period in 2008, largely due to proceeds from our investments during the three months ended March 31, 2008.

**Financing Activities** Cash provided by financing activities totaled $1,391 million during the three months ended March 31, 2009 compared with $1,433 million used during the three months ended March 31, 2008, primarily due to a decrease in common shares repurchased of $1,108 million and proceeds from borrowings of $1,827 million in 2009. There were no debt issuances during the three months ended March 31, 2008.

During the three months ended March 31, 2009, we repaid $71 million of debt, including scheduled repayments of $66 million of debt held at BCC. The recorded balance of debt as of March 31, 2009 was $9,272 million, of which $530 million was classified as short-term. This includes $3,580 million of debt recorded at BCC, of which $498 million was classified as short-term.

During the three months ended March 31, 2009, we repurchased 1,173,152 shares at an average price of $42.94 in our open market share repurchase program and 339,132 shares in stock swaps. During the three months ended March 31, 2008, we repurchased 15,553,535 shares at an average price of $79.69 in our open market share repurchase program and 1,258 shares in stock swaps. Cash used for treasury share repurchases was $50 million for the three months ended March 31, 2009, compared with $1,158 million for the same period in 2008.

**Credit Ratings** Our credit ratings are summarized below:

|  | Fitch | Moody’s | Standard & Poor’s |
| --- | --- | --- | --- |
| Long-term: |  |  |  |
| Boeing/BCC | A+ | A2 | A+ |
| Short-term: |  |  |  |
| Boeing/BCC | F1 | P-1 | A-1 |

On January 29, 2009 Standard & Poor’s (S&P) confirmed Boeing’s and BCC’s A+ credit rating but changed its outlook from stable to negative, citing the challenging commercial aviation environment. On April 10, 2009, S&P placed Boeing’s and BCC’s A+ credit rating on credit watch with negative implications. The rating for short-term borrowing was reaffirmed at A-1. S&P indicated in its April 10, 2009 announcement that they expect any lowering of the long-term ratings in connection with the credit watch placement would likely be limited to one notch, which would be to an ‘A’ rating.

**Capital Resources** We believe we have substantial borrowing capability. We and BCC have commercial paper programs that continue to serve as significant potential sources of short-term liquidity. As of March 31, 2009, neither we nor BCC had any outstanding commercial paper issuances. Currently, we have $3,000 million ($1,500 million exclusively available for BCC) of unused borrowing on revolving credit line agreements. We anticipate that these credit lines will primarily serve as backup liquidity to support possible commercial paper borrowings in 2009. BCC has a $5,000 million shelf registration statement that was declared effective on November 12, 2008 under which it may offer debt securities.

In March 2009, our Board of Directors authorized debt financings of up to $3,000 million. Pursuant to the authorization, on March 9, 2009, we filed a public shelf registration with the U.S. Securities and Exchange Commission for the issuance of debt securities and common stock. On March 13, 2009, we issued notes totaling $1,850 million under the registration statement. The net proceeds after deducting the discount, underwriting fees and issuance costs were $1,817 million.

We believe our ability to access external capital resources should be sufficient to satisfy existing short-term and long-term commitments and plans, and also to provide adequate financial flexibility to take advantage of potential strategic business opportunities should they arise within the next year. At this point in time, our access to liquidity sources has not been materially impacted by the current credit environment, and we do not expect that it will be materially impacted in the near future. There can be no assurance, however, that the cost or availability of future borrowings, if any, under our commercial paper program, in the debt markets or our credit facilities will not be materially impacted by the ongoing capital market disruptions.

We have negative Shareholders’ equity as a result of the remeasurement of our pension assets and obligations as of December 31, 2008. We do not expect negative Shareholders’ equity to affect our ability to pay dividends or comply with debt covenants. However, additional deterioration in the funded status of our pension plans may result in additional contributions to those plans.

As of March 31, 2009, we continue to be in full compliance with all covenants contained in our debt agreements.

### Off-Balance Sheet Arrangements

We are a party to certain off-balance sheet arrangements including certain guarantees. For discussion of these arrangements, see Note 6.

### Contingent Obligations

We have significant contingent obligations that arise in the ordinary course of business, which include the following:

**Legal** Various legal proceedings, claims and investigations are pending against us. Legal contingencies are discussed in Note 12, including our contesting the default termination of the A-12 aircraft, employment and benefits litigation brought by several of our employees, and litigation/arbitration involving BSSI.

**Environmental Remediation** We are involved with various environmental remediation activities and have recorded a liability of $716 million at March 31, 2009. For additional information, see Note 5.

**Income Taxes** We have recorded a net liability of $1,413 million at March 31, 2009 for uncertain tax positions. For further discussion of income taxes, see Note 3.

## Controls and procedures

As filed, 1,166 characters.

(a) Disclosure Controls and Procedures.

Our Chief Executive Officer and Chief Financial Officer have evaluated our disclosure controls as of March 31, 2009 and have concluded that these disclosure controls and procedures are effective to ensure that information required to be disclosed by us in the reports that we file or submit under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms. These disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by us in the reports we file or submit is accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

(b) Changes in Internal Control Over Financial Reporting.

There were no changes in our internal control over financial reporting that occurred during the first quarter of 2009 that have materially affected or are reasonably likely to materially affect our internal control over financial reporting.

## Risk factors

As filed, 5,024 characters.

Certain risks described below update the risk factors in Part 1, Item 1A. Risk Factors in our 2008 Annual Report on Form 10-K for the year ended December 31, 2008.

***We depend heavily upon commercial customers, our suppliers and the worldwide market, which are subject to unique risks.***

*Market conditions have a significant impact on our ability to sell aircraft into the future.* The worldwide market for commercial jet aircraft is predominantly driven by long-term trends in airline passenger and cargo traffic. The principal factors underlying long-term traffic growth are sustained economic growth and political stability, both in developed and emerging countries. Demand for our commercial aircraft is further influenced by airline industry profitability, world trade policies, government-to-government relations, terrorism, disease outbreaks, environmental constraints imposed upon aircraft operations, technological changes, price and other competitive factors.

***We enter into fixed-price contracts, which could subject us to losses if we have cost overruns.***

Many of our contracts in IDS and most of our contracts in Commercial Airplanes are contracted on a fixed-price basis. Approximately 50% of IDS revenues are generated from fixed-price contracts. Commercial jet aircraft are normally sold on a firm fixed-price basis with an indexed price escalation clause. These escalation clauses account for the effects of economic fluctuations over the period of time from airplane sale to airplane delivery. A price escalation formula based on pre-defined factors is used to determine the final price of the airplane at the time of customer delivery. While firm fixed-price contracts allow us to benefit from cost savings, they also expose us to the risk of cost overruns and changes in escalation. If the initial estimates we use to calculate the contract price and the cost to perform the work prove to be incorrect, we could incur losses. In addition, some of our contracts have specific provisions relating to cost, schedule, and performance. If we fail to meet the terms specified in those contracts, then our cost to perform the work could increase or our price could be reduced, which would adversely affect our financial condition. These programs have risk for reach-forward losses if our estimated costs exceed our estimated price.

Fixed-price development work inherently has more uncertainty than production contracts and, therefore, more variability in estimates of the cost to complete the work. Many of these development programs have very complex designs. As technical or quality issues arise, we may experience schedule delays and higher costs to complete. Additionally, price escalation factors may also impact margins by reducing the estimated price of airplanes delivered in the future. Both of these factors may ultimately result in a material charge if the program has or is determined to have a reach forward loss. Successful performance depends on our ability to meet production specifications and delivery rates. If we are unable to perform and deliver to contract requirements, our contract price could be reduced through the incorporation of liquidated damages, termination of the contract for default, or other financially significant exposure. Management uses its best judgment to estimate the cost to perform the work, the price we will eventually be paid and, in the case of commercial programs, the number of units to include in the initial accounting quantity. While we believe the cost and price estimates incorporated in the financial statements are appropriate, future events could result in either upward or downward adjustments to those estimates. Changes to estimates of the program accounting quantity, production costs and rates, learning curve, costs of derivatives, customer negotiations/settlements, supplier claims and certification issues could also result in lower margins or reach-forward losses. For example, in 2006 and in second quarter 2008, we recorded charges of $770 million and $248 million, respectively, on our AEW&C program due to schedule delays and higher cost estimates. In 2008, we recorded a charge of $685 million for a reach-forward loss on our 747 program as a result of schedule delays and higher cost estimates associated with the development of the 747-8 freighter and passenger derivative aircraft. In the first quarter of 2009, we recorded a charge of $347 million for a reach-forward loss on our 747 program primarily caused by a reduction in projected delivery price increases associated with escalation and production rate changes. We may continue to experience technical and quality issues requiring further delays in schedule or revisions to our cost estimates. Examples of significant IDS fixed-price development contracts include International KC-767 Tankers, commercial and military satellites, Vigilare and High Frequency Modernisation. Examples of significant Commercial Airplanes development programs include the 787 and 747-8.

Filed Apr 22, 2009.