## Management's discussion and analysis

As filed, 169,566 characters.

The following discussion updates “Management’s Discussion and Analysis of Financial Condition and Results of Operations” incorporated by reference in HEI’s and HECO’s Form 10-K for the year ended December 31, 2008 and should be read in conjunction with the annual (as of and for the year ended December 31, 2008) and the quarterly (as of and for the three months ended March 31, 2009) consolidated financial statements of HEI and HECO and accompanying notes.

### HEI Consolidated

### RESULTS OF OPERATIONS

*(in thousands, except per share amounts)*

|  | Three months ended March 31, 2009 | 2008 | % change | Primary reason(s) for significant change\* |
| --- | ---: | ---: | ---: | --- |
| Revenues | $543,797 | $729,617 | (25) | Decrease for the electric utility and the bank segments |
| Operating income | 44,658 | 70,746 | (37) | Decrease for the electric utility and the bank segments |
| Net income | 20,395 | 33,967 | (40) | Lower operating income, partly offset by higher AFUDC, lower “interest expense—other than on deposit liabilities and other bank borrowings” and lower income taxes\*\* |
| Basic earnings per common share | $0.23 | $0.41 | (44) | Lower net income and higher weighted average shares outstanding |
| Weighted-average number of common shares outstanding | 90,604 | 83,472 | 9 | Issuances of shares under a common stock offering in December 2008 and the HEI Dividend Reinvestment and Stock Purchase Plan and other Company plans |

\* Also, see segment discussions which follow.

\*\* The Company’s effective tax rates (federal and state) for the first quarters of 2009 and 2008 were 35% and 37%, respectively.

***Dividends***. The payout ratios for 2008 and the first quarter of 2009 were 116% and 135%, respectively. Excluding the $35.6 million net charge related to ASB’s balance sheet restructuring (and disregarding other adjustments to net income that would be necessary to more fully reflect the impact on net income if the restructuring had not occurred), the payout ratio for 2008 would have been 83%. HEI currently expects to maintain the dividend at its present level; however, the HEI Board of Directors evaluates the dividend quarterly and considers many factors in the evaluation, including but not limited to the Company’s results of operations, the long-term prospects for the Company, and current and expected future economic conditions.

### Economic conditions

*Note: The statistical data in this section is from public third-party sources (e.g., Department of Business, Economic Development and Tourism; University of Hawaii Economic Research Organization; Hawaii Department of Labor and Industrial Relations; Honolulu Board of Realtors; Blue Chip Financial Forecasts; Bloomberg and local newspapers).*

As a consequence of deteriorating financial conditions within the banking industry, a series of events occurred in the last four months of 2008 that resulted in unprecedented global capital market volatility and decline that continues in 2009.

The Hawaii economy continued to decline in the first quarter of 2009 due to the pressures created by volatile capital markets and the depressed national economy. State economists now expect a much deeper and longer Hawaii recession. Hawaii economic growth as measured by the change in real personal income is expected to be lower by 2.5% in 2009 compared to 2008 and by 0.2% in 2010 compared to 2009.

Weakness is most notable in one of the state’s largest industries, tourism. The closure of Aloha and ATA Airlines, departure of two Norwegian Cruise Line cruise ships from Hawaii, record-high oil prices and downturn in the national economy impacted the visitor industry in 2008. The severity of the global downturn and constraints to consumer spending are expected to cause tourism to remain at a low level through 2010, with only a gradual recovery thereafter. Visitor arrivals were down 14% for the first quarter of 2009 compared to the same quarter in 2008. Arrivals in 2009 are expected to be down from 2008 levels by approximately 5% and flat in 2010. Visitor expenditures were down 18% quarter over quarter.

Local tourism authorities continue to increase marketing efforts in Hawaii’s base market, the western U.S., to help stimulate travel to the state.

At 7.1%, seasonally-adjusted Hawaii unemployment at the end of March 2009 remains below the national average of 8.5%, but is much higher than the average annual rates of 2.6% for 2007 and 4% for 2008. Declines in tourism and in consumer spending are expected to cause job losses in 2009, with the largest job losses expected in the construction, accommodation and food services sectors. The job base is expected to contract by 2.4% in 2009 and 0.3% in 2010. The Hawaii unemployment rate is expected to be 7.0% in 2009 and 7.6% in 2010.

The Oahu housing market continued to contract in the first quarter of 2009. Home sales for the first quarter were down 35%, and the median sales price for the quarter of $570,000 was down 8.1% compared with the first quarter of 2008. Foreclosures in Hawaii are on the rise, increasing by a record 503% in March 2009 compared to March 2008. However, the State of Hawaii foreclosure ranking fell back to 30th in March 2009, compared to 27th in February 2009 and 30th in January 2009.

The global credit crisis and deepening recession have impacted the Hawaii construction industry. Commercial and resort building are hampered by financing constraints and a bleak national outlook. Residential construction is expected to decline as income and wealth losses undermine housing demand. Government spending initiatives may provide substantial support for the industry in the medium term. Construction activity, as measured by permitting activity (excluding military construction) declined 27% in the first quarter of 2009 compared with the same period in 2008.

On a national level, the Blue Chip economic consensus dated April 1, 2009 predicts real gross domestic product (GDP) to decline by 5.3% and 2.4% for the first and second quarters of 2009 compared to the immediately preceeding quarter, respectively. Recovery is expected to resume in the second half of 2009. Consumer confidence has been adversely affected and credit is tight, which in turn has and will continue to negatively impact consumer spending.

The price of a barrel of crude oil has fallen sharply, with prices dropping from a peak of $145.29 per barrel on July 3, 2008, and closing at $50.97 per barrel on April 29, 2009.

Interest rates remained low during the first quarter of 2009, including relatively low mortgage rates. The low level of interest rates continued to put downward pressure on yields on loans and investments, but also contributed to lower deposit and borrowing costs.

Overall, the Hawaii economy continues to weaken as the U.S. and Japan economies continue to weaken and relief is not expected until late 2010, or possibly late 2009 at the earliest.

***Emergency Economic Stabilization Act of 2008 and American Economic Recovery and Reinvestment Act of 2009***. The Emergency Economic Stabilization Act of 2008 (the 2008 Act) was signed into law on October 3, 2008. The principal parts of the 2008 Act are: (1) a $700 billion financial markets stabilization plan; and (2) $150 billion in tax benefits, which are partially offset by $40 billion in revenue raisers. As part of its energy and conservation related incentives, the 2008 Act allows public utility property to qualify for the energy credit for periods after February 13, 2008 and extends the credit for solar energy property, fuel cell property and microturbine property through December 31, 2016. In addition, the 2008 Act allows the credit for combined heat and power (CHP) system property as energy property for periods after October 3, 2008. Further, the 2008 Act extends the renewable production credit through December 31, 2009 for qualified wind and refined coal production facilities and through December 31, 2010 for other sources. The 2008 Act also provides for a 10-year accelerated depreciation period for smart electric meters and smart electric grid equipment for property placed in service after October 3, 2008. Finally, the 2008 Act extends the per-gallon incentives for biodiesel and alternative fuels through December 31, 2009. The tax provisions of the 2008 Act did not have a material effect on the Company’s results of operations for 2008. These tax provisions, however, may influence the Company’s decisions to invest in the various properties entitled to credits and favorable depreciation. The Company will continue to analyze the 2008 Act for its impacts on results of operations, financial condition and liquidity and for the opportunities it presents.

The American Economic Recovery and Reinvestment Act of 2009 (the 2009 Act) was signed into law on February 17, 2009 at a total cost of $787 billion. The 2009 Act, which is intended to provide a stimulus to the U.S. economy in the midst of the global financial crisis, is comprised of tax relief, spending on infrastructure, health care and alternative energy and aid to states and local governments. The 2009 Act includes more than $300 billion in tax relief, which is focused primarily on low and middle income taxpayers and small businesses. The energy provisions set in motion President Obama’s campaign promises to implement a “green’ economic recovery.

The extension through 2009 of bonus depreciation, as originally provided in the 2008 Economic Stimulus Act, has the most direct and immediate impact on the Company. Although not quantified, the additional tax depreciation deduction will increase deferred income taxes and provide positive cash flow. The energy related provisions of the 2009 Act may impact utility operations indirectly. Some of the energy incentives are as follows: (1) a 30% tax credit of up to $1,500 for the purchase of highly efficient residential air conditioners, heat pumps or furnaces, (2) $0.3 billion in rebates for purchases of efficient appliances, (3) $20 billion for “green” jobs to make wind turbines and solar panels and to improve energy efficiency in schools and federal buildings, (4) $6 billion in loan guarantees for renewable energy projects, (5) $5 billion to help low-income homeowners make energy improvements, (6) $11 billion to modernize and expand the U.S. electric power grid, (7) $2 billion for research into batteries for future electric cars and (8) the extension of existing energy incentives and the addition of a few new ones. Finally, the 2009 Act temporarily eliminates the alternative minimum tax preference item for private activity bond interest for bonds (such as special purpose revenue bonds issued by HECO and its subsidiaries) issued in 2009 and 2010. This favorable change may influence the utilities’ decision to issue such bonds before the end of 2010.

The Company will continue to analyze the 2009 Act for its impacts on results of operations, financial condition and liquidity and for the opportunities it presents.

***Retirement benefits***. For the first quarter of 2009, the Company’s defined benefit retirement plans’ assets generated a loss, including investment management fees, of 6.3%. The market value of the defined benefit retirement plans’ assets as of March 31, 2009 was $676 million compared to $726 million at December 31, 2008, a decline of approximately $50 million.

Additional guidance on funding relief for qualified defined benefit pension plans was received in March 2009 including: (1) IRS Notice 2009-22 related to the application of new asset valuation rules included in the “Worker, Retiree, and Employer Recovery Act of 2008” and (2) publication of a “Special Edition March 2009 employee plans news” related to yield curve selection for the target liability calculation. As a result, the Company estimates that the cash funding for the qualified defined benefit pension plans in 2009 and 2010 will be about $16 million and $42 million, respectively, which should fully satisfy the minimum required contribution, including requirements of the utilities pension tracking mechanisms and the Plan’s funding policy. Prior to the March 2009 funding relief measures, cash funding to satisfy the minimum required contribution in 2009 and 2010 was estimated to be $21 million and $64 million, respectively.

Other factors could cause changes to the required contribution levels. The Pension Protection Act provides that if a pension plan’s funded status falls below certain levels more conservative assumptions must be used to value obligations and restrictions on participant benefit accruals may be placed on the plans.

The credit rating agencies consider many factors when assigning their ratings. The distress in the worldwide financial market has significantly increased the unfunded status of the Company’s pension plans, and may be a factor considered by the credit rating agencies in their evaluations. The associated increase in pension plan funding requirements will negatively impact certain financial metrics utilized by the credit rating agencies in determining the Company’s credit ratings and could result in a reduction of the Company’s credit ratings from their current levels.

***Commitments and contingencies***. See Note 7 of HEI’s “Notes to Consolidated Financial Statements.”

***Recent accounting pronouncements and interpretations***. See Note 9 of HEI’s “Notes to Consolidated Financial Statements.”

### “Other” segment

*(in thousands)*

|  | Three months ended March 31, 2009 | 2008 | % change | Primary reason(s) for significant change |
| --- | ---: | ---: | --- | --- |
| Revenues | $(32) | $(116) | NM | Lower unrealized losses on venture capital investments |
| Operating loss | (3,532) | (3,600) | NM | See explanation for revenues and lower proxy costs (expected to be higher in the second quarter), partly offset by higher consulting and other administrative and general expenses |
| Net loss | (4,619) | (5,194) | NM | See explanation for operating loss and lower interest expense |

NM Not meaningful.

The “other” business segment includes results of operations of HEI and HEI Diversified, Inc. (HEIDI), holding companies; HEI Investments, Inc. (HEIII), a company previously holding investments in leveraged leases; Pacific Energy Conservation Services, Inc., a contract services company primarily providing wind farm operational and maintenance services to an affiliated electric utility; HEI Properties, Inc., a company holding passive, venture capital investments; The Old Oahu Tug Service, Inc., a maritime freight transportation company that ceased operations in 1999; and eliminations of intercompany transactions. Since HEIII sold all of its leveraged lease investments by the end of 2007, HEIII has filed articles of dissolution and is winding up its affairs.

### FINANCIAL CONDITION

### Liquidity and capital resources

Despite the recent unprecedented deterioration in the capital markets and tightening of credit, the Company believes that its ability to generate cash, both internally from electric utility and banking operations and externally from issuances of equity and debt securities, commercial paper and bank borrowings, is adequate to maintain sufficient liquidity to fund its contractual obligations and commercial commitments, its forecasted capital expenditures and investments, its expected retirement benefit plan contributions and other cash requirements in the foreseeable future.

The consolidated capital structure of HEI (excluding ASB’s deposit liabilities and other borrowings) was as follows as of the dates indicated:

*(in millions)*

|  | March 31, 2009 |  | December 31, 2008 |  |
| --- | ---: | ---: | ---: | ---: |
| Short-term borrowings—other than bank | $— | —% | $— | —% |
| Long-term debt, net—other than bank | 1,215 | 46 | 1,212 | 46 |
| Preferred stock of subsidiaries | 34 | 1 | 34 | 1 |
| Common stock equity | 1,404 | 53 | 1,389 | 53 |
|  | $2,653 | 100% | $2,635 | 100% |

45

As of May 1, 2009, the Standard & Poor’s (S&P) and Moody’s Investors Service’s (Moody’s) ratings of HEI securities were as follows:

|  | S&P | Moody’s |
| --- | --- | --- |
| Commercial paper | A-2 | P-2 |
| Senior unsecured debt | BBB | Baa2 |

The above ratings reflect only the view of the applicable rating agency at the time the ratings are issued, from whom an explanation of the significance of such ratings may be obtained. Such ratings are not recommendations to buy, sell or hold any securities; such ratings may be subject to revision or withdrawal at any time by the rating agencies; and each rating should be evaluated independently of any other rating.

HEI’s overall S&P corporate credit rating is BBB/Stable/A-2. HEI’s issuer rating by Moody’s is Baa2 and Moody’s outlook for HEI is “stable.”

The rating agencies use a combination of qualitative measures (e.g., assessment of business risk that incorporates an analysis of the qualitative factors such as management, competitive positioning, operations, markets and regulation) as well as quantitative measures (e.g., cash flow, debt, interest coverage and liquidity ratios) in determining the ratings of HEI securities. In November 2008, S&P affirmed its corporate credit ratings and “stable” outlook for HEI. S&P’s ratings outlook indicates the potential direction of a possible rating change in the coming 6 to 24 months. S&P stated:

The stable outlook reflects our expectation that, for now, HECO appears to have reasonable but not certain prospects for maintaining its existing financial profile, which is weak for the rating. Multiple near-term challenges face the company and include the uncertainties of the cost and feasibility impacts of the CEI \[Clean Energy Initiative\], the potential for a significant reduction in electric sales in 2009 (due to economic contraction, energy efficiency initiatives, and customer response to high prices), and a recent softening in leading economic indicators. These challenges suggest that a negative outlook or downward revision to the ratings could be possible over the outlook horizon, as further weakening in the financial profile will not support ratings, and near-term business risk will be elevated until the particulars of the CEI are in place and prove to be supportive. Consistent, timely rate relief will continue to be key, and could offset or mitigate the effects of a declining economic environment, but decoupling or other measures are not expected to be available to the company before late 2009 or early 2010. Given these challenges, higher ratings are not foreseen during the outlook horizon and would need to be accompanied by sustained and improved financial performance.

S&P designates business risk profiles as “excellent,” “strong,” “satisfactory,” “weak” or “vulnerable.” In November 2008, S&P designated HEI’s business profile as ‘strong’ and noted that it reflects a degree of diversification afforded by ASB’s banking business. However, S&P noted that the consolidated profile’s strengths are tempered by the reliance of both businesses on Hawaii’s economy. S&P further observed that structural shifts in HECO’s business contemplated under the Hawaii Clean Energy Initiative is the largest challenge facing HEI’s consolidated operations, along with the potential of ASB credit losses as a function of a weakening Hawaii economy.

S&P’s financial risk designations are “minimal,” “modest,” “intermediate,” “aggressive” and “highly leveraged.” In November 2008, S&P indicated that “\[t\]he consolidated financial profile is ‘aggressive,’ reflecting in part the very heavy debt imputation we apply to the three utilities for power purchase agreements (PPA).”

In September 2008, Moody’s affirmed its credit ratings and “stable” outlook for HEI. Moody’s stated, “\[t\]he rating could be downgraded should weaker than expected economic growth and regulatory support emerge at HECO which ultimately causes earnings and sustainable cash flows to suffer over an extended period.” Consequently, Moody’s indicated that a shift in its expectations regarding the company’s future sustainable levels of consolidated financial ratios such as Funds From Operations (net cash flow from operations less net changes in working capital items) to Adjusted Debt below 16% (16% as of June 30, 2008 – latest reported by Moody’s) or Funds From Operations to Adjusted Interest of less than 3.5x (3.9x as of June 30, 2008 – latest reported by Moody’s) could result in a lowering of the Company’s rating.

See the electric utilities’ and bank’s respective “Liquidity and capital resources” sections below for the ratings of HECO and ASB.

Information about the Company’s short-term borrowings and HEI’s line of credit facility was as follows:

*(in millions)*

| Short-term borrowings | Three months ended March 31, 2009 Average balance | End-of-period balance | December 31, 2008 |
| --- | ---: | ---: | ---: |
| HEI commercial paper | $— | $— | $— |
| HEI line of credit draws | — | — | — |
| HECO commercial paper | 1 | — | — |
|  | $1 | $— | $— |
| Line of credit facility (expiring March 31, 2011) 1 |  | $100 | $100 |
| Undrawn capacity under HEI’s line of credit facility 2 |  | 100 | 100 |

1 In the future, the Company may seek to enter into new lines of credit and may also seek to increase the amount of credit available under such lines as management deems appropriate. This table does not include HECO’s separate line of credit facilities.

2 At May 1, 2009, there was no outstanding commercial paper balance and the line of credit facility was undrawn.

HEI utilizes short-term debt, typically commercial paper, to support normal operations, to refinance commercial paper, to retire long-term debt and for other temporary requirements. HEI also periodically makes short-term loans to HECO to meet HECO’s cash requirements, including the funding of loans by HECO to HELCO and MECO. As of March 31, 2009, HEI had no short-term borrowings outstanding and had short-term loans to HECO of $29 million. HEI expects to sell commercial paper in the latter half of 2009. Management believes that if HEI’s commercial paper ratings were to be downgraded, or if credit markets for commercial paper with HEI’s ratings or otherwise were to further tighten, it would be more difficult and expensive to sell commercial paper or it might not be able to sell commercial paper in the future.

In November 2008, HEI filed an omnibus registration statement to register an indeterminate amount of debt, equity and hybrid securities. Under Securities and Exchange Commission (SEC) regulations, this registration statement expires on November 4, 2011. On December 2, 2008, HEI offered and priced under the registration a public offering of 5,000,000 shares of its common stock at $23 per share for gross proceeds of $115 million. HEI used the net proceeds of approximately $110 million, after deduction of underwriting discounts and commissions and estimated HEI expenses, to repay its outstanding short-term indebtedness, to make loans to HECO and for working capital and other general corporate purposes. An over-allotment option granted to the underwriters was not exercised.

For the first three months of 2009, net cash provided by operating activities of consolidated HEI was $115 million. Net cash provided by investing activities for the same period was $157 million, primarily due to net decreases in investment and mortgage-related securities and loans receivable at ASB, partly offset by HECO’s consolidated capital expenditures. Net cash used in financing activities during this period was $294 million as a result of several factors, including net decreases in deposit liabilities, retail repurchase agreements, other bank borrowings and cash overdrafts and the payment of common stock dividends, partly offset by proceeds from the issuance of common stock under HEI plans and funds from the drawdown of revenue bond proceeds.

Forecasted HEI consolidated “net cash used in investing activities” (excluding “investing” cash flows from ASB) for 2009 through 2011 consists primarily of the net capital expenditures of HECO and its subsidiaries. In addition to the funds required for the electric utilities’ construction program, approximately $150 million will be required in 2011 to repay maturing HEI medium-term notes, which are expected to be repaid with the proceeds from the issuance of commercial paper, common stock issued under Company plans and/or dividends from subsidiaries. Additional debt and/or equity financing may be utilized to pay down commercial paper or other short-term borrowings or may be required to fund uncertain or unanticipated expenditures not included in the 2009 through 2011 forecast, such as increases in the costs of or an acceleration of the construction of capital projects of the utilities, utility capital expenditures that may be required by the HCEI or new environmental laws and regulations, unbudgeted acquisitions or investments in new businesses, significant increases in retirement benefit funding requirements and higher tax payments that would result if certain tax positions taken by the Company do not prevail. In addition, existing debt may be refinanced prior to maturity (potentially at more favorable rates) with additional debt or equity financing (or both).

The Company was not required to make any contributions to the qualified pension plans to meet minimum funding requirements pursuant to ERISA for 2008, but made voluntary contributions in 2008. Contributions to the retirement benefit plans totaled $15 million in 2008 (comprised of $14 million made by the utilities, $1 million by HEI and nil by ASB) and are expected to total $32 million in 2009 ($31 million by the utilities, $1 million by HEI and nil by ASB). Depending on the performance of the assets held in the plans’ trusts and numerous other factors, additional contributions may be required in the future to meet the minimum funding requirements of ERISA or to pay benefits to plan participants. Although credit markets have tightened and may tighten further, the Company believes it will have adequate access to capital resources to support any necessary funding requirements.

### CERTAIN FACTORS THAT MAY AFFECT FUTURE RESULTS AND FINANCIAL CONDITION

The Company’s results of operations and financial condition can be affected by numerous factors, many of which are beyond the Company’s control and could cause future results of operations to differ materially from historical results. For information about certain of these factors, see pages 15 to 16, 42 to 47, and 56 to 58 of HEI’s MD&A which is incorporated into Part II, Item 7 of HEI’s 2008 Form 10-K by reference to HEI Exhibit 13 to HEI’s Current Report on Form 8-K dated February 19, 2009.

Additional factors that may affect future results and financial condition are described on pages iv and v under “Forward-Looking Statements.”

### MATERIAL ESTIMATES AND CRITICAL ACCOUNTING POLICIES

In preparing financial statements, management is required to make estimates and assumptions that affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities and the reported amounts of revenues and expenses. Actual results could differ significantly from those estimates.

In accordance with SEC Release No. 33-8040, “Cautionary Advice Regarding Disclosure About Critical Accounting Policies,” management has identified the accounting policies it believes to be the most critical to the Company’s financial statements—that is, management believes that these policies are both the most important to the portrayal of the Company’s financial condition and results of operations, and currently require management’s most difficult, subjective or complex judgments.

For information about these material estimates and critical accounting policies, see pages 16 to 17, 47 to 48, and 59 of HEI’s MD&A which is incorporated into Part II, Item 7 of HEI’s 2008 Form 10-K by reference to HEI Exhibit 13 to HEI’s Current Report on Form 8-K dated February 19, 2009.

Following are discussions of the results of operations, liquidity and capital resources of the electric utility and bank segments.

### Electric utility

### RESULTS OF OPERATIONS

*(dollars in thousands, except per barrel amounts)*

|  | Three months ended March 31, 2009 | 2008 | % change | Primary reason(s) for significant change |
| --- | ---: | ---: | ---: | --- |
| Revenues | $461,797 | $623,889 | (26) | Lower fuel oil and purchased energy fuel costs, the effects of which are generally passed on to customers ($122 million), and lower KWH sales ($49 million), partially offset by higher DSM costs recovered through a surcharge ($3 million) |
| Expenses |  |  |  |  |
| Fuel oil | 145,289 | 249,543 | (42) | Lower fuel oil costs and less KWHs generated |
| Purchased power | 114,484 | 150,795 | (24) | Lower fuel costs and less KWHs purchased |
| Other operation | 62,397 | 55,579 | 12 | See “Results – three months ended March 31, 2009” below |
| Maintenance | 26,163 | 23,613 | 11 | See “Results – three months ended March 31, 2009” below |
| Depreciation | 36,424 | 35,434 | 3 | Additions to plant in service in 2008 |
| Taxes, other than income taxes | 45,735 | 57,486 | (20) | Decrease in revenues |
| Other | 236 | 456 | (48) |  |
| Operating income | 31,069 | 50,983 | (39) | Lower sales and higher expenses |
| Net income | 14,132 | 24,585 | (43) | Lower operating income, partly offset by higher AFUDC |
| Kilowatthour sales (millions) | 2,231 | 2,409 | (7) | Slowing economy, customer conservation, cooler, less humid weather on Oahu and the effect of an additional leap year day in February 2008 |
| Cooling degree days (Oahu) | 759 | 954 | (20) |  |
| Average fuel oil cost per barrel | $60.02 | $93.89 | (36) |  |

Note: The electric utilities had an effective tax rate for the first quarters of 2009 and 2008 of 37% and 38%, respectively.

See “Economic conditions” in the “HEI Consolidated” section above.

***Results – three months ended March 31, 2009***. Operating income for the first quarter of 2009 decreased 39% from the same period in 2008 due primarily to lower sales and higher operation and maintenance (O&M) expenses. For the first quarter of 2009, kilowatthour (KWH) sales were down 7.4% compared with the same quarter of 2008. About two-thirds of the decline in sales is attributable to cooler, less humid weather and one less day of sales due to the leap year day in 2008. The soft economy and overall ongoing customer conservation account for the remainder of the first quarter sales decline.

“Other operation” expenses increased by $7 million in 2009 primarily due to higher DSM expenses (see “Demand-side management programs” below) that are generally passed on to customers through surcharges ($2.5 million), $1.8 million higher planned production and transmission and distribution operations expense to maintain reliable operations and pursue renewable initiatives; $0.9 million higher employee benefit costs and

$0.5 million higher bad debt expense. Maintenance expense increased $2.6 million primarily due to the greater scope of generating unit overhauls and higher expenses for overhead line maintenance and vegetation management.

The trend of increased O&M expenses is expected to continue as the electric utilities expect higher production expenses (primarily due to increased utilization of HECO’s generating assets commensurate with the level of demand that has occurred over the past five years), higher contract services costs, and higher transmission and distribution expenses to maintain system reliability. Also, additional expenses are expected to be incurred for the costs of CIP CT-1 after July 2009 when it is expected to commence commercial operations, for environmental compliance in response to more stringent regulatory requirements, and to execute the provisions of the Energy Agreement. Partly offsetting the anticipated increased costs are lower DSM expenses (that are generally passed on to customers through a surcharge) due to the transition of energy efficiency programs to a third-party administrator during 2009.

As a result of cumulative load growth over the past five years on Oahu and other factors, there remains an increased risk to generation reliability at least until HECO installs its planned new generating unit in the third quarter of 2009. Although peak demand moderated in 2008, generation reserve margins on Oahu continued to be strained. HECO has taken a number of steps to mitigate the risk of outages, including securing additional purchased power, adding DG at some substations and encouraging energy conservation. The costs of supplying energy to meet high demand and the maintenance costs required to sustain high availability of the aging generating units have been increasing and the trend of increased costs is not likely to ease.

***Renewable energy strategy***. The electric utilities have been taking actions intended to protect Hawaii’s island ecology and counter global warming, while continuing to provide reliable power to customers, and recently committed to a number of related actions in the Energy Agreement. A three-pronged strategy supports attainment of the requirements and goals of the State of Hawaii Renewable Portfolio Standards (RPS), the Hawaii Global Warming Solutions Act of 2007 and the HCEI by: 1) the greening of existing assets, 2) the expansion of renewable energy generation and 3) the acceleration of energy efficiency and load management programs. Major initiatives are being pursued in each category, and additional ones have been committed to in the Energy Agreement.

In its June 27, 2008 filing with the PUC, HECO reported a consolidated RPS of 16.1% in 2007. This was accomplished through a combination of municipal solid waste, geothermal, wind, biomass, hydro, photovoltaic and biodiesel renewable generation resources; renewable energy displacement technologies; and energy savings from efficiency technologies.

The electric utilities are actively exploring the use of biofuels for existing and planned company-owned generating units. HECO has committed to using 100% biofuels for its new 110 MW generating unit planned for 2009. HECO is researching the possibility of switching its steam generating units from fossil fuels to biofuels, and in the Energy Agreement has committed to do so if economically and technically feasible and if adequate biofuels are available.

In January 2007, HECO and MECO agreed to form a venture with BlueEarth Biofuels LLC (BlueEarth) to develop a biodiesel production facility on MECO property in Wa’ena on the island of Maui. BlueEarth Maui Biofuels LLC (BlueEarth Maui), a joint venture to pursue biodiesel development, was formed in early 2008 between BlueEarth and Uluwehiokama Biofuels Corp. (UBC), a non-regulated subsidiary of HECO. In February 2008, an Operating Agreement and an Investment Agreement were executed between BlueEarth and UBC, under which UBC invested $400,000 in BlueEarth Maui in exchange for a minority ownership interest. All of UBC’s profits from the project were intended to be directed into a biofuels public trust to be created for the purpose of funding biofuels development in Hawaii. MECO intended to lease to BlueEarth Maui a portion of the land owned by MECO for its future Waena generation station as the site for the biodiesel plant, with lease proceeds intended to be credited to MECO ratepayers. MECO had been negotiating with BlueEarth Maui for a fuel purchase contract for biodiesel to be used in existing diesel-fired units at MECO’s Maalaea plant. Both the land lease agreement and biodiesel fuel contract would require PUC approval. However, BlueEarth’s and MECO’s negotiations for the biodiesel supply contract stalled based on inability to reach agreement on various financial and risk allocation issues. In October 2008, BlueEarth filed an action in federal district court in Texas against MECO, HECO and others alleging claims based on the parties’ failure to have reached agreement on the biodiesel supply and land agreements. The lawsuit seeks damages and equitable relief. In April 2009, the defendants’ motions to transfer venue of the action to Hawaii were granted.

The electric utilities also support renewable energy through their solar water heating and heat pump programs, and the negotiation and execution of purchased power contracts with non-utility generators using renewable sources (e.g., refuse-fired, geothermal, hydroelectric and wind turbine generating systems). In November 2007, HECO entered into a contract to purchase energy from a photovoltaic system with a generating capacity of up to 300 kilowatts (kW) to be located at HECO’s Archer substation. The PUC approved the contract in May 2008. In October 2008, the PUC approved a power purchase contract between MECO and Lanai Sustainability Research, LLC for the purchase of 1.2 MW of electricity from a photovoltaic system owned by Lanai Sustainability Research, LLC, which was placed in service in December 2008. In December 2008, the PUC approved a power purchase contract between HELCO and Keahole Solar Power LLC (a wholly-owned subsidiary of Sopogy, Inc.) for the purchase of energy from a 500 kW concentrated solar power facility. In March 2009, HECO and HELCO filed an executed term sheet with the PUC for a power purchase contract with Hu Honua Bioenergy, LLC, which intends to refurbish a biomass plant located on the island of Hawaii.

In September 2007, HECO issued a Solicitation of Interest for its planned Renewable Energy Request for Proposals (RFP) for combined renewable energy projects up to 100 MW on Oahu. In June 2008, the PUC approved HECO’s Oahu Renewable Energy RFP and HECO issued the RFP shortly thereafter. HECO received bids representing a variety of renewable technologies and a short list of bids proceeding to the Interconnection Requirements Study phase has been identified. Included in the bids received were proposals for large scale neighbor island wind projects. In accordance with the Energy Agreement, the proposals for large scale neighbor island wind projects (Big Wind projects) were bifurcated from the Oahu Renewable Energy RFP. The utilities intend to separately negotiate purchase power agreements with two neighbor island wind projects that would produce energy to be imported to Oahu via a yet-to-be-built undersea transmission cable system.

HECO’s unregulated subsidiary, Renewable Hawaii, Inc. (RHI), was established to stimulate renewable energy initiatives by prospecting for new projects and sites and taking a passive, minority interest in selected third-party renewable energy projects. Beginning in 2003, RHI actively pursued a number of projects, particularly those utilizing wind, landfill gas, and ocean energy. While RHI has executed some memoranda of understanding and conditional investment agreements with project developers, no investments have been made to date.

The electric utilities promote research and development in the areas supporting renewable energy such as biofuels, ocean energy, battery storage, electronic shock absorber, and integration of non-firm power into the separate island electric grids.

Energy efficiency and DSM programs for commercial and industrial customers, and residential customers, including load control programs, have resulted in reducing system peak load and contribute to the achievement of the RPS. Since the inception of the energy efficiency and DSM programs in 1996 and through the end of 2008, the total system peak load has been reduced by 163 MW (143 MW at HECO, 8 MW at HELCO, and 12 MW at MECO) at the gross generation level and net of estimated reductions from participants who would have installed the DSM measure without the program and rebate.

For a description of some of the major provisions of the Energy Agreement most directly affecting HECO and its subsidiaries and their commitments relating to renewable energy and energy efficiency, see “Hawaii Clean Energy Initiative” in Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

Also, see “Renewable Portfolio Standard” under “Legislation and regulation” below.

***Competition***. Although competition in the generation sector in Hawaii has been moderated by the scarcity of generation sites, various permitting processes and lack of interconnections to other electric utilities, HECO and its subsidiaries face competition from IPPs and customer self-generation, with or without cogeneration.

In 1996, the PUC issued an order instituting a proceeding to identify and examine the issues surrounding electric competition and to determine the impact of competition on the electric utility infrastructure in Hawaii. In October 2003, the PUC opened investigative proceedings on two specific issues (competitive bidding and DG) to move toward a more competitive electric industry environment under cost-based regulation. For a description of some of the regulatory changes that will be pursued as part of the Energy Agreement, see “Hawaii Clean Energy Initiative” in Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

Competitive bidding proceeding. The stated purpose of this proceeding, commenced in 2003, was to evaluate competitive bidding as a mechanism for acquiring or building new generating capacity in Hawaii. In December 2006, the PUC issued a decision that included a final competitive bidding framework, which became effective immediately. The final framework states, among other things, that under the framework: (1) a utility is required to use competitive bidding to acquire a future generation resource or a block of generation resources unless the PUC finds bidding to be unsuitable; (2) the determination of whether to use competitive bidding for a future generation resource or a block of generation resources will be made by the PUC during its review of the utility’s IRP; (3) the framework does not apply to three pending projects, specifically identified offers to sell energy on an as-available basis or to sell firm energy and/or capacity by non-fossil fuel producers and certain other situations identified in the framework; (4) waivers from competitive bidding for certain circumstances will be considered by the PUC; (5) for each project that is subject to competitive bidding, the utility is required to submit a report on the cost of parallel planning upon the PUC’s request; (6) the utility is required to consider the effects on competitive bidding of not allowing bidders access to utility-owned or controlled sites, and to present reasons to the PUC for not allowing site access to bidders when the utility has not chosen to offer a site to a third party; (7) the utility is required to select an independent observer from a list approved by the PUC whenever the utility or its affiliate seeks to advance a project proposal (i.e., in competition with those offered by bidders); (8) the utility may consider its own self-bid proposals in response to generation needs identified in its RFP; (9) the evaluation of the utility’s bid should account for the possibility that the capital or running costs actually incurred, and recovered from ratepayers, over the plant’s lifetime, will vary from the levels assumed in the utility’s bid; and (10) for any resource to which competitive bidding does not apply (due to waiver or exemption), the utility retains its traditional obligation to offer to purchase capacity and energy from a Qualifying Facility (QF) at avoided cost upon reasonable terms and conditions approved by the PUC.

In 2007, the PUC approved the utilities’ tariffs containing procedures for interconnection and transmission upgrades, a list of qualified candidates for the Independent Observer position for future competitive bidding processes and a Code of Conduct.

In June 2008, HECO issued a RFP, which seeks proposals for the supply of up to approximately 100 MW of long-term renewable energy for the island of Oahu under a PPA. Bids were received in September 2008 and a short list of bidders was identified in December 2008. Further discussions with the short listed bidders have begun and an interconnection requirements study has commenced. The Energy Agreement recognized that the Oahu Renewable Energy RFP provides an excellent near-term opportunity to add new clean renewable energy sources on Oahu and included the anticipated up to 100 MW of renewable energy from these project proposals in its goals. See “Renewable energy strategy” above for a discussion on the bifurcation of the large-scale neighbor island wind project proposals from the other proposals received in response to the Oahu Renewable Energy RFP.

In December 2007, in response to MECO’s request for approval to proceed with a competitive bidding process to acquire two separate increments of approximately 20 MW to 25 MW of firm generating capacity on the island of Maui in the 2011 and 2015 timeframes, the PUC issued an order opening a new docket to receive filings, review approval requests, and resolve disputes, if necessary, related to MECO’s proposed RFP. The order identified MECO and the Consumer Advocate as parties to this new docket and approved MECO’s contract with the Independent Observer for the proposed RFP. The schedule for competitive bidding for the first capacity increment (now targeted for 2015) has been revised and is expected to begin in 2009 to support the issuance of a draft RFP in 2010. The schedule for the second increment is under review.

In May 2008, the PUC issued a D&O stating that PGV’s proposal to modify its existing PPA with HELCO to provide an additional 8 MW of firm capacity by expanding its existing facility is exempt from the Competitive Bidding Framework. In the third quarter of 2008, the PUC granted requests for waivers from the Competitive Bidding Framework for four projects (at HELCO—one biomass, a wind/hydroelectric and a wind/battery energy storage, and at MECO—one biomass), subject to the submittal of a fully executed term sheet within four months of the decision granting the waiver, and documentation showing the fairness of the price being included in the application for approval of a PPA. In the fourth quarter 2008, the PUC granted a request for waiver from the Competitive Bidding Framework for another biomass project on the island of Hawaii, subject to the same conditions as the four previous waivers. The waivers granted in the third quarter of 2008 expired in December 2008 and January 2009 due to the inability of the parties to reach agreement on term sheets. As an alternative to submitting fully executed term sheets for the wind/hydroelectric and wind/battery energy storage projects on the Island of Hawaii, HECO and HELCO informed the PUC that they will be proposing a competitive bidding process to acquire renewable generation on the island of Hawaii. In February 2009, HELCO submitted preliminary plans and timeline for the proposed competitive bidding process and advised the PUC that adjustments may be considered to include firm dispatchable and/or schedulable resources depending on the status of the remaining waivered biomass project. The scope of the proposed competitive bidding process is under review. In March 2009, HELCO reached agreement on a term sheet with the remaining waivered biomass project.

In September 2008, HECO submitted fully executed term sheets for the following three renewable energy projects on Oahu that were “grandfathered” from the competitive bidding process: a Honua Power steam turbine generator, a Kahuku Wind Power wind farm, and a Sea Solar Power International ocean thermal energy conversion project. In October 2008, timelines for the completion and execution of the power purchase contracts and the planned in-service dates for these three projects were submitted to the PUC.

Management cannot currently predict the ultimate effect of these developments on the ability of the utilities to acquire or build additional generating capacity in the future.

DG proceeding. In October 2003, the PUC opened a DG proceeding to determine DG’s potential benefits to and impact on Hawaii’s electric distribution systems and markets and to develop policies and a framework for DG projects deployed in Hawaii.

In January 2006, the PUC issued its D&O indicating that its policy is to promote the development of a market structure that assures DG is available at the lowest feasible cost, DG that is economical and reliable has an opportunity to come to fruition and DG that is not cost-effective does not enter the system. The D&O affirmed the ability of the utilities to procure and operate DG for utility purposes at utility sites. The PUC also indicated its desire to promote the development of a competitive market for customer-sited DG. The PUC found that the “disadvantages outweigh the advantages” of allowing a utility to provide DG services on a customer’s site. However, the PUC also found that the utility “is the most informed potential provider of DG” and it would not be in the public interest to exclude the utilities from providing DG services at this early stage of DG market development. Therefore, the D&O allows the utility to provide DG services on a customer-owned site as a regulated service when (1) the DG resolves a legitimate system need, (2) the DG is the lowest cost alternative to meet that need, and (3) it can be shown that, in an open and competitive process acceptable to the PUC, the customer operator was unable to find another entity ready and able to supply the proposed DG service at a price and quality comparable to the utility’s offering.

The January 2006 D&O also required the utilities to file tariffs and establish standby rates based on unbundled costs associated with providing each service (i.e., generation, distribution, transmission and ancillary services). The utilities filed their proposed modifications to existing DG interconnection tariffs and their proposed unbundled standby rates for PUC approval in the third quarter of 2006. The Consumer Advocate stated that it did not object to implementation of the interconnection and standby rate tariffs at that time, but reserved the right to review the reasonableness of both tariffs in rate proceedings for each of the utilities. See “Distributed generation tariff proceeding” below.

In April 2006, the PUC provided clarification to the conditions under which the utilities are allowed to provide regulated DG services (e.g., the utilities can use a portfolio perspective—a DG project aggregated with other DG systems and other supply-side and demand-side options—to support a finding that utility-owned customer-sited DG projects fulfill a legitimate system need, and the economic standard of “least cost” in the order means “lowest reasonable cost” consistent with the standard in the IRP framework), and affirmed that the electric utility has the responsibility to demonstrate that it meets all applicable criteria included in the D&O in its application for PUC approval to proceed with a specific DG project.

The utilities are developing or evaluating potential DG projects. In September 2008, HECO executed an agreement with the State of Hawaii Department of Transportation to develop a dispatchable standby generation (DSG) facility at the Honolulu Airport that will be owned by the State and operated by HECO. The D&O encouraged HECO to pursue such DG operating arrangements with customers. HECO filed an application to the PUC for approval of the agreement in December 2008 and the PUC proceeding is in progress.

HECO is also evaluating the potential to develop utility-owned DG at Oahu military bases, in a manner consistent with the D&O, in order to meet utility system needs and the energy objectives of the U.S. Department of Defense. In 2009, HECO will conduct a feasibility review of extending the use of temporary DG units that were installed at various HECO substations in 2005 to 2007 and converting them to run on biodiesel.

In February 2008, MECO received PUC approval of an agreement for the installation of a CHP system at a hotel site on the island of Lanai. The CHP system is planned to be placed in service in the third quarter of 2009.

Distributed generation tariff proceeding. In December 2006, the PUC opened a new proceeding to investigate the utilities’ proposed DG interconnection tariff modifications and standby rate tariffs. In March 2008, the parties to the proceeding filed a settlement agreement with the PUC proposing that a standby service tariff agreed to by the parties should be approved. The interconnection tariffs, with modifications made in response to the PUC’s information requests, were approved in April 2008. In May 2008, the PUC approved the settlement agreement on the standby service tariff.

In September 2008, the PUC requested that the utilities address various inconsistencies in the interconnection tariff sheets. In the fourth quarter of 2008, the utilities filed revised interconnection tariff sheets and the PUC issued an order approving the revised interconnection tariff sheets and closing the DG tariff proceeding.

Under the Energy Agreement, the utilities will conduct a review of the modified DG interconnection tariffs by June 30, 2009, to evaluate whether the tariffs are effective in supporting non-utility DG and distributed energy storage by improving the process and procedure for interconnection. If modifications are deemed necessary, a request to modify the DG interconnection tariff would be filed with the PUC later in 2009.

DG and distributed energy storage under the Energy Agreement. Under the Energy Agreement, the utilities committed to facilitate planning for distributed energy resources through a new Clean Energy Scenario Planning process. Under this process, Locational Value Maps will be developed by December 31, 2009 to identify areas where DG and DES would provide utility system benefits and can be reasonably accommodated.

The utilities also agreed to power utility-owned DG using sustainable biofuels or other renewable technologies and fuels, and to support either customer-owned or utility-owned distributed energy storage.

The parties to the Energy Agreement support reconsideration of the PUC’s restrictions on utility-owned DG where it is proven that utility ownership and dispatch clearly benefits grid reliability and ratepayer interests, and the equipment is competitively procured. The parties also support HECO’s dispatchable standby generation (DSG) units upon showing reasonable ratepayer benefits.

The utilities may contract with third parties to aggregate fleets of DG or standby generators for utility dispatch or under PPAs, or may undertake such aggregation themselves if no third parties respond to a solicitation for such services.

The Energy Agreement also provides that to the degree that transmission and distribution automation and other smart grid technology investments are needed to facilitate distributed energy resource utilization, those investments will be recovered through a Clean Energy Infrastructure Surcharge and later placed in rate base in the next rate case proceeding.

***Most recent rate requests.*** The electric utilities initiate PUC proceedings from time to time to request electric rate increases to cover rising operating costs and the cost of plant and equipment, including the cost of new capital projects to maintain and improve service reliability. The PUC may grant an interim increase within 10 to 11 months following the filing of the application, but there is no guarantee of such an interim increase or its amount and interim amounts collected are refundable, with interest, to the extent they exceed the amount approved in the PUC’s final D&O. The timing and amount of any final increase is determined at the discretion of the PUC. The adoption of revenue, expense, rate base and cost of capital amounts (including the return on average common equity (ROACE) and return on rate base (ROR)) for purposes of an interim rate increase does not commit the PUC to accept any such amounts in its final D&O.

As of May 1, 2009, the return on average common equity (ROACE) found by the PUC to be reasonable in the most recent final rate decision for each utility was 10.7% for HECO (D&O issued on May 1, 2008, based on a 2005 test year), 11.5% for HELCO (D&O issued on February 8, 2001, based on a 2000 test year) and 10.94% for MECO (amended D&O issued on April 6, 1999, based on a 1999 test year). The ROACEs used by the PUC in the interim rate increases in HECO, HELCO and MECO rate cases based on 2007, 2006 and 2007 test years issued in October, April and December 2007, respectively, were 10.7%.

For the 12 months ended March 31, 2009, the actual ROACEs (calculated under the rate-making method, which excludes the effects of items not included in determining electric utility rates, and reported to the PUC) for HECO, HELCO and MECO were 7.32%, 7.98% and 7.13%, respectively. HECO’s actual ROACE was 338 basis points lower than its authorized ROACE primarily due to lower KWH sales and increased O&M expenses, which are expected to continue. HELCO and MECO’s actual ROACEs were 272 and 357 basis points, respectively, lower than their interim D&O ROACEs due in part to lower KWH sales.

As of May 1, 2009, the return on rate base (ROR) found by the PUC to be reasonable in the most recent final rate decision for each utility was 8.66% for HECO, 9.14% for HELCO and 8.83% for MECO (D&Os noted above). The RORs used by the PUC for purposes of the interim D&Os in the HECO, HELCO and MECO rate cases based on 2007, 2006 and 2007 test years were 8.62%, 8.33% and 8.67%, respectively. For the 12 months ended March 31, 2009, the actual RORs (calculated under the rate-making method, which excludes the effects of items not included in determining electric utility rates, and reported to the PUC) for HECO, HELCO and MECO were 6.42%, 6.25% and 6.36%, respectively.

In 2007, HECO, HELCO and MECO received interim D&Os in their most recent rate cases, which included the reclassification to a regulatory asset of the charge for retirement benefits that would otherwise be recorded in accumulated other comprehensive income (AOCI).

For a description of some of the rate-making changes that the parties have agreed to pursue under the Energy Agreement, see “Hawaii Clean Energy Initiative” in Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

HECO.

*2005 test year rate case.* In November 2004, HECO filed a request with the PUC to increase base rates, based on a 2005 test year, a 9.11% ROR and an 11.5% ROACE. Disregarding an amount included in the request to transfer the cost of existing DSM programs from a surcharge line item on electric bills into base electricity charges, which issue was bifurcated for consideration in another proceeding (the EE DSM Docket), the requested base rates increase was $74 million, or 7.3%.

In September 2005, HECO, the Consumer Advocate and the federal Department of Defense (DOD) reached agreement (subject to PUC approval) on most of the issues in the rate case proceeding. The significant issue not resolved among the parties was the appropriateness of including in rate base approximately $50 million related to HECO’s prepaid pension asset, net of deferred income taxes.

Later in September 2005, the PUC issued its interim D&O, authorizing an increase of $53 million ($41 million net additional revenues). For purposes of the interim D&O, the PUC included HECO’s prepaid pension asset in rate base (with an annual rate increase impact of approximately $7 million).

On October 25, 2007, the PUC issued an amended proposed final D&O, authorizing a net increase of 2.7%, or $34 million, in annual revenues, based on a 10.7% ROACE (and an 8.66% ROR on a rate base of $1.060 billion). The amended proposed final D&O, which was issued in final form with certain modifications (as described below), reversed the portion of the interim D&O related to the inclusion of HECO’s approximately $50 million pension asset, net of deferred income taxes, in rate base, and required a refund of revenues associated with that reversal, including interest, retroactive to September 28, 2005 (the date the interim increase became effective). In the third quarter of 2007, HECO accrued $15 million for the potential customer refunds, reducing third quarter 2007 net income by $8.3 million. The potential additional refund to customers for the amounts recorded under interim rates in excess of the amount in the amended proposed final D&O from October 1, 2007 through October 21, 2007, with interest through July 19, 2008, was approximately $1.8 million, which amount was reserved for the refund and included an adjustment for the interest synchronization method adopted by the PUC (as proposed by the DOD in its filed exception to the proposed final D&O).

On May 1, 2008, the PUC issued the final D&O for HECO’s 2005 test year rate case, which was consistent with the stipulated revised results of operations filed by the parties on March 28, 2008, and authorized an increase of $45 million in annual revenues ($34 million net) based on a 10.7% ROACE (and an 8.66% ROR on a rate base of $1.060 billion). In the final D&O, the PUC accepted the parties’ position that the review of the ECAC under Act 162 (Hawaii Revised Statutes §269-16(g)) should not be required in this case, but would be made in HECO’s 2007 test year rate case. Following the issuance of the final D&O, the required refund, with interest, to customers was completed in August 2008. On October 2, 2008, HECO filed with the PUC its 2005 test year rate case refund reconciliation, which reflected that $1.4 million was over-refunded. On October 28, 2008, the PUC issued a letter stating that HECO was not authorized to collect the over-refunded amount and HECO reduced its revenues for the third quarter of 2008 by $1.4 million.

*2007 test year rate case.* On December 22, 2006, HECO filed a request with the PUC for a general rate increase of $99.6 million, or 7.1% over the electric rates currently in effect (i.e., over rates that included the interim rate increase discussed above of $53 million ($41 million net additional revenues) granted by the PUC in September 2005), based on a 2007 test year, an 8.92% ROR, an 11.25% ROACE and a $1.214 billion average rate base. This rate case excluded DSM surcharge revenues and associated incremental DSM costs because certain DSM issues, including cost recovery, were being addressed in the EE DSM Docket.

HECO’s 2006 application included a proposed new tiered rate structure for residential customers to reward customers who practice energy conservation with lower electric rates for lower monthly usage. The proposed rate increase includes costs incurred to maintain and improve reliability, such as the new Dispatch Center building and associated equipment and the Energy Management System that became operational in 2006, new substations, a new outage management system (added in 2007) and increased O&M expenses.

The application addressed the energy cost adjustment clause (ECAC) provisions of Act 162 and requested the continuation of HECO’s ECAC. On December 29, 2006, the electric utilities’ Report on Power Cost Adjustments and Hedging Fuel Risks (ECAC Report) prepared by their consultant, National Economic Research Associates, Inc., was filed with the PUC. The testimonies filed in the latest rate cases for HECO, HELCO and MECO included or incorporated the ECAC Report, which concluded that (1) the electric utilities’ ECACs are well-designed, and benefit the electric utilities and their ratepayers and (2) the ECACs comply with the statutory requirements of Act 162. With respect to hedging, the consultants concluded that (1) hedging of oil prices by HECO would not be expected to reduce fuel and purchased power costs and in fact would be expected to increase the level of such costs and (2) even if rate smoothing is a desired goal, there may be more effective means of meeting the goal, and there is no compelling reason for the electric utilities to use fuel price hedging as the means of achieving the objective of increased rate stability.

HECO’s application requested a return on HECO’s pension assets (i.e., accumulated contributions in excess of accumulated net periodic pension costs) by including such assets (net of deferred taxes) in rate base. In a separate AOCI proceeding, the electric utilities had earlier requested PUC approval to record as a regulatory asset for financial reporting purposes, the amounts that would otherwise be charged to AOCI in stockholders’ equity as a result of adopting SFAS No. 158, but that request was denied. HECO thus proposed in the 2007 test year rate case to restore to book equity for ratemaking purposes the amounts charged to AOCI as a result of adopting SFAS No. 158. The authorized ROACE found to be fair in a rate case is applied to the equity balance in determining the utility’s weighted cost of capital, which is the rate of return applied to the rate base in determining the utility’s revenue requirements. HECO’s position was that, if the reduction in equity balance resulting from the AOCI charges is not restored for ratemaking purposes, a higher ROACE will be required.

In March 2007, a public hearing on the rate case was held. In April 2007, the PUC granted the DOD’s motion to intervene.

In a June 2007 update to its direct testimonies, HECO proposed pension and OPEB tracking mechanisms, similar to the mechanisms that were agreed to by HELCO and the Consumer Advocate and approved on an interim basis by the PUC in the HELCO 2006 test year rate case (discussed below). A pension funding study (required by the PUC in the AOCI proceeding) was filed in the HECO rate case in May 2007. The conclusions in the study were consistent with the funding practice proposed with the pension tracking mechanism. For a discussion of this mechanism and related pension issues, see Note 4, “Retirement Benefits” of HECO’s “Notes to Consolidated Financial Statements.”

On September 6, 2007, HECO, the Consumer Advocate and the DOD (the parties) executed and filed an agreement on most of the issues in HECO’s 2007 test year rate case and HECO submitted a statement of probable entitlement with the PUC. The agreement was subject to approval by the PUC.

The amount of the revenue increase based on the stipulated agreement was $70 million annually, or a 4.96% increase over current effective rates at the time of the stipulation. The settlement agreement included, as a negotiated compromise of the parties’ respective positions, an ROACE of 10.7% (and an 8.62% ROR and a $1.158 billion average rate base) to determine revenue requirements in the proceeding. In the settlement agreement, the parties agreed that the final rates set in HECO’s 2005 test year rate case may impact revenues at current effective rates and at present rates, and indicated that the amount of the stipulated interim rate increase in this case would be adjusted to take into account any such changes. For purposes of the settlement, the parties agreed to a pension tracking mechanism that does not include amortization of HECO’s pension asset (comprised of accumulated contributions to its pension plan in excess of net periodic pension cost and amounting to $68 million at December 31, 2006) as part of the pension tracking mechanism in the proceeding. (This has the effect of deferring the issue of whether the pension asset should be amortized for rate making purposes to HECO’s next rate case.)

In accordance with Act 162, the PUC, by an order issued August 24, 2007, had added as an issue to be addressed in the rate case whether HECO’s ECAC complies with the requirements of Act 162. In the settlement agreement, the parties agreed that the ECAC should continue in its present form for purposes of an interim rate increase and stated that they are continuing discussions with respect to the final design of the ECAC to be proposed for approval in the final D&O. The parties agreed to file proposed findings of fact and conclusions of law on all issues in this proceeding, including the ECAC. The parties agreed that their resolution of the ECAC issue would not affect their agreement regarding revenue requirements in the proceeding.

On October 22, 2007, the PUC issued, and HECO implemented, an interim D&O granting HECO an increase of $70 million in annual revenues over rates effective at the time of the interim D&O, subject to refund with interest. The interim increase was based on the settlement agreement described above and did not include in rate base the HECO pension asset. The interim D&O also approved, on an interim basis, the adoption of the pension tracking mechanism and a tracking mechanism for OPEB. See “Interim increases” in Note 5 and Note 4, “Retirement benefits,” of HECO’s “Notes to Consolidated Financial Statements.”

On May 1, 2008, the PUC issued the final D&O for HECO’s 2005 test year rate case, which was consistent with the stipulated revised results of operations filed by the parties on March 28, 2008. Consistent with the previous settlement agreement with the parties in this case, HECO filed a motion with the PUC in May 2008 to adjust the amount of the annual interim increase in this proceeding from $70 million to $77.9 million to take into account the changes in current effective rates as a result of the final decision in the 2005 test year rate case, and to have the change be effective at the same time the tariff sheets reflecting the final decision in the 2005 rate case become effective. In June 2008, the PUC approved HECO’s motion. On September 30, 2008, HECO filed a correction with the PUC to adjust the amount of the annual interim increase for the 2007 test year rate case from $77.9 million to $77.5 million and filed tariff sheets to be effective October 1 through 31, 2008 to refund $0.1 million over-collected from June 20 to September 30, 2008.

On December 30, 2008, HECO and the Consumer Advocate filed a joint set of proposed findings of fact and conclusions of law and HECO requested that the PUC approve the final rate increase of $77.5 million.

Management cannot predict the timing, or the ultimate outcome, of a final D&O in HECO’s 2007 test year rate case.

*2009 test year rate case*. On July 3, 2008, HECO filed a request for a general rate increase of $97 million or 5.2% over the electric rates currently in effect (i.e., over rates that included the interim rate increase discussed above granted by the PUC in HECO’s 2007 test year rate case, which amount is $77 million based on the effects of the final decision in HECO’s 2005 test year rate case), based on a 2009 test year, an 8.81% ROR, an 11.25% ROACE, and a $1.408 billion rate base. HECO’s application requested an interim increase of $73 million on or before the statutory deadline for interim rate relief and a step increase of $24 million based on the return on the annualized net investment of the new CIP CT-1 and recovery of associated expenses to be effective at the in-service date of the new unit, scheduled for the end of July 2009.

The requested rate increase was based on anticipated plant additions estimated at the time of filing of $375 million in 2008 and 2009 (including $162 million for the new CIP CT-1 and related transmission line) to maintain and improve system reliability, higher operation and maintenance costs required for HECO’s electrical system, and higher depreciation expenses since the last rate case. To the extent actual project costs are higher than the estimate included in the requested rate increase (e.g., higher costs for the CIP CT-1 and transmission line), HECO plans to seek recovery in a future proceeding. As in its 2007 test year rate case, HECO requests continuation of its ECAC in its present form. The request excludes incremental DSM costs from the test year revenue requirement due to the transition of HECO’s DSM programs to a third-party program administrator in 2009 as ordered by the PUC.

In August 2008, the PUC granted the DOD’s motion to intervene in the rate case proceeding. In September 2008, the PUC held a public hearing on HECO’s rate increase application.

In the Energy Agreement, the parties agree to seek approval from the PUC to implement in the interim D&O in the 2009 HECO rate case a decoupling mechanism (see Decoupling proceeding below). HECO filed updates to its 2009 test year rate case in November and December 2008, which proposed to establish a revenue balancing account for a decoupling mechanism and a purchased power adjustment clause.

In January 2009, the PUC issued an amended stipulated procedural order for the proceeding, which includes an interim D&O by July 2, 2009, and evidentiary hearings scheduled for the week of August 10, 2009.

In March 2009, HECO agreed to remove certain costs and expenses from the rate case, including unamortized system development costs related to replacement of its customer information system due to a delay in transitioning to the new system. See Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

In April 2009, the Consumer Advocate and the DOD filed their direct testimonies in this proceeding. The Consumer Advocate recommended a revenue increase of $62.7 million based on its proposed ROR of 7.86%, an ROACE ranging between 9.5% and 10.5% and a proposed average rate base of $1.259 billion. The Consumer Advocate recommended an average rate base treatment for the CIP CT-1, which is scheduled to go into service on July 31, 2009, rather than accept the Company’s proposal for a step increase based on the annualized net cost of the CIP CT-1 which would go into effect on the in-service date of the new unit. In its recommendations, the Consumer Advocate also removed the costs and expenses identified by HECO in March 2009 relating to the replacement of HECO’s customer information system. The DOD recommended a revenue increase of $45.1 million based on its proposed ROR of 7.85%, an ROACE of 9.50% and a proposed average rate base of $1.309 billion. The DOD also recommended an average rate base treatment for the CIP CT-1 and in its recommendations has removed the costs and expenses identified by HECO in March 2009 relating to the replacement of HECO’s customer information system.

Management cannot predict the timing, or the ultimate outcome, of an interim or final D&O in this rate case.

HELCO. In May 2006, HELCO filed a request with the PUC to increase base rates by $29.9 million, or 9.24% in annual base revenues, based on a 2006 test year, an 8.65% ROR, an 11.25% ROACE and a $369 million average rate base. HELCO’s application included a proposed new tiered rate structure, which would enable most residential users to see smaller increases in the range of 3% to 8%. The tiered rate structure was designed to minimize the increase for residential customers using less electricity and is expected to encourage customers to take advantage of solar water heating programs and other energy management options. In addition, HELCO’s application proposed new time-of-use service rates for residential and commercial customers. The proposed rate increase would pay for improvements made to increase reliability, including transmission and distribution line improvements and the two generating units at the Keahole power plant (CT-4 and CT-5), and increased O&M expenses. The application requested the continuation of HELCO’s ECAC.

The PUC held public hearings on HELCO’s application in June 2006. In February 2007, the Consumer Advocate submitted its testimony in the proceeding, recommending a revenue increase of $16.6 million based on its proposed ROR of 7.95%, a ROACE ranging between 9.50% and 10.25% and a proposed average rate base of $345 million. The Consumer Advocate recommended adjustments of $21.5 million to HELCO’s rate base for a portion of CT-4 and CT-5 costs (primarily relating to HELCO’s allowance for funds used during construction (AFUDC), land use permitting costs, and related litigation expenses). In the filing, the Consumer Advocate’s consultant concluded that HELCO’s ECAC provides a fair sharing of the risks of fuel cost changes between HELCO and its ratepayers in a manner that preserves the financial integrity of HELCO without the need for frequent rate filings.

Keahole Defense Coalition (whose participation in the proceeding is limited) submitted in February 2007 a Position Statement in which it contended that the PUC should exclude from rate base a greater amount of the CT-4 and CT-5 costs than proposed by the Consumer Advocate.

In March 2007, HELCO and the Consumer Advocate reached settlement agreements on all revenue requirement issues in the HELCO 2006 rate case proceeding, which were documented in an April 5, 2007 settlement letter. Under the revenue requirement agreement, HELCO agreed to write-off a portion of CT-4 and CT-5 costs, which resulted in an after-tax charge of approximately $7 million in the first quarter of 2007.

On April 4, 2007, the PUC issued an interim D&O, which was implemented by tariff changes made effective on April 5, 2007, granting HELCO an increase of 7.58%, or $24.6 million in annual revenues, over revenues at present rates for a normalized 2006 test year. The interim increase reflects the settlement of the revenue requirement issues reached between HELCO and the Consumer Advocate and is based on an average rate base of $357 million (which reflects the write-off of a portion of CT-4 and CT-5 costs) and an ROR of 8.33% (incorporating an ROACE of 10.7%). In the interim D&O, the PUC also approved on an interim basis the adoption of pension and OPEB tracking mechanisms (see Note 4 of HECO’s “Notes to Consolidated Financial Statements”).

Pursuant to an agreed upon schedule of proceedings, Keahole Defense Coalition filed a response to HELCO’s rebuttal testimony on April 28, 2007, to which HELCO responded on May 11, 2007. On May 15, 2007, HELCO and the Consumer Advocate filed a settlement letter that reflected their agreement on the remaining rate design issues in the proceeding. HELCO and the Consumer Advocate filed their opening briefs in support of their settlement on June 4, 2007 and agreed not to file reply briefs. In April 2008, HELCO and the Consumer Advocate filed a supplement providing additional record cites and supporting information relevant to their April 2007 settlement letter. In July 2008, HELCO submitted responses to information requests from the PUC regarding the impacts of passing changes in fuel and purchased energy costs to customers through the ECAC.

Management cannot predict the timing, or the ultimate outcome, of a final D&O in this rate case.

In order to implement the decoupling mechanism committed to by the parties in the Energy Agreement, the parties agreed that HELCO would file a 2009 test year rate case. In light of a recent PUC action denying MECO’s motion for approval to use a 2009 test year (see “MECO 2009 test year rate case” below), HELCO is evaluating the timing of its rate case filing.

MECO.

*2007 test year rate case*. In February 2007, MECO filed a request with the PUC to increase base rates by $19.0 million, or 5.3% in annual base revenues, based on a 2007 test year, an 8.98% ROR, an 11.25% ROACE and a $386 million average rate base. MECO’s application included a proposed new tiered rate structure for residential customers to reward customers who practice energy conservation with lower electric rates for lower monthly usage. The proposed rate increase would pay for improvements to increase reliability, including two new generating units added since MECO’s last rate case (which was based on a 1999 test year) at its Maalaea Power plant (M19, a 20 MW CT placed in service in 2000 and M18, an 18 MW steam turbine placed in service in October 2006 to complete the installation of a second dual-train combined cycle unit), and transmission and distribution infrastructure improvements. The proposed rate structure also included continuation of MECO’s ECAC. The application requested a return on MECO’s pension assets (i.e., accumulated contributions in excess of accumulated net periodic pension costs) by including such assets (net of deferred income taxes) in rate base. The application also proposed to restore book equity (in determining the equity balance for ratemaking purposes) for the amounts that were charged against equity (i.e., to AOCI) as a result of recording a pension and other postretirement benefits liability after implementing SFAS No. 158.

In an update to its direct testimonies filed in September 2007, MECO proposed a lower increase in annual revenues of $18.3 million, or 5.1%, but its request continued to be based on an 8.98% ROR and an 11.25% ROACE. Also in the update, MECO proposed tracking mechanisms for pension and OPEB, similar to the mechanisms proposed by HECO and HELCO, and approved by the PUC on an interim basis, in their 2007 and 2006 test year rate cases, respectively. In October 2007, the Consumer Advocate filed its direct testimony which recommended a revenue increase of $8.9 million, based on a ROR of 8.29% and a ROACE of 10.0%. $4.75 million of the $9.4 million difference between MECO’s and the Consumer Advocate’s proposed increase is caused by the Consumer Advocate’s lower recommended ROR and ROACE.

On December 7, 2007, MECO and the Consumer Advocate (for purposes of this section, the “parties”) reached a settlement of all the revenue requirement issues in this rate case proceeding. For purposes of the settlement agreement, the parties agreed that MECO’s ECAC provides a fair sharing of the risks of fuel cost changes between MECO and its ratepayers and no further changes are required for MECO’s energy adjustment clause to comply with the requirements of Act 162.

On December 21, 2007, the PUC issued an interim D&O granting MECO an increase of $13.2 million in annual revenues, or a 3.7% increase, subject to refund with interest. The interim increase is based on the settlement agreement, which included as a negotiated compromise of the Parties’ respective positions, an increase of $13.2 million in annual revenue, a 10.7% ROACE, an 8.67% ROR and a rate base of $383 million (which did not include MECO’s pension asset, which amounted to $1 million as of December 31, 2007).

In the interim D&O, the PUC also approved on an interim basis the adoption of pension and OPEB tracking mechanisms (see Note 4 of HECO’s “Notes to Consolidated Financial Statements”).

On April 17, 2009, the PUC directed the parties to file by July 17, 2009 stipulated proposed findings of fact and conclusions of law or, if they are unable to stipulate, each party’s proposed findings of fact and conclusions of law.

Management cannot predict the timing, or the ultimate outcome, of a final D&O in this rate case.

*2009 test year rate case.* On March 20, 2009, MECO filed a Notice of Intent to file an application for a general rate increase on or after May 29, 2009 (but before June 30, 2009) and a motion requesting PUC approval to use a 2009 calendar year test period for this upcoming rate case. The filing of this general rate increase application is in accordance with the Energy Agreement, under which the parties agreed that MECO would file a 2009 test year rate case to implement a decoupling mechanism. On April 27, 2009, the PUC issued an order denying MECO’s motion and stating that MECO may elect to file its rate case application with either a split 2009/2010 test period or a 2010 calendar test period, pursuant to the PUC’s rules. Under the rules, MECO (and HELCO) would be allowed to file rate cases with 2010 test years on or after July 1, 2009.

***Decoupling proceeding.*** In the Energy Agreement, the parties agreed to seek approval from the PUC to implement, beginning with the 2009 HECO rate case interim decision, a decoupling mechanism, similar to that in place for several California utilities, which decouples revenue of the utilities from KWH sales and provides revenue adjustments (increases/decreases) for the differences (shortages/overages) between the amount determined in the last rate case and (a) the current cost of operating the utility as deemed reasonable and approved by the PUC, (b) the return on and return of ongoing capital investment (excluding projects included in a proposed new Clean Energy Infrastructure Surcharge), and (c) changes in tax expense due to changes in State or Federal tax rates. The decoupling mechanism would be subject to review at any time by the PUC or upon request of the utility or Consumer Advocate.

On October 24, 2008, the PUC opened an investigative proceeding to examine implementing a decoupling mechanism for the utilities. In addition to the utilities and the Consumer Advocate, there are five other parties in the proceeding. On March 30, 2009, the utilities and the Consumer Advocate filed their joint proposal and initial statement of position and the other parties filed their initial statements of position. The utilities’ and Consumer Advocate’s joint proposal is for a decoupling mechanism with two components: (1) a sales decoupling component via a revenue balancing account and a revenue escalation component via a revenue adjustment mechanism and (2) an earnings sharing mechanism. (In December 2008, HECO proposed in its 2009 test year rate case to establish a revenue balancing account to decouple sales from revenues to be effective upon the issuance of the interim decision and order in that rate case.) The remaining schedule for the proceeding includes final position statements of the parties to be submitted in May 2009 and panel hearings during June 2009.

Management cannot predict the timing, or the ultimate outcome, of a final D&O in the decoupling proceeding.

**Other regulatory matters.** In addition to the items below, also see “Hawaii Clean Energy Initiative” and “Major projects” in Note 5 of HECO’s “Notes to Consolidated Financial Statements” for a number of actions committed to in the Energy Agreement that will require PUC approval in either pending or new PUC proceedings.

Demand-side management programs. On February 13, 2007, the PUC issued its D&O in the EE DSM Docket that had been opened by the PUC to bifurcate the EE DSM issues originally raised in the HECO 2005 test year rate case. In the D&O, the PUC required that the administration of all EE DSM programs be turned over to a non-utility, third-party administrator, with the transition to the administrator, funded through a public benefits fund

(PBF) surcharge. The PUC opened a new docket to select a third-party administrator and to refine details of the new market structure in an order issued in September 2007. In the order, the PUC stated that “\[u\]pon selection of the PBF Administrator, the PUC intends, in this docket, to determine whether the electric utilities will be allowed to compete for the implementation of the Energy Efficiency DSM programs.” In July 2008, the PUC issued an Order to Initiate the Collection of Funds for the PBF Administrator of Energy Efficiency Programs, which authorized the electric utilities to expense $50,000 per quarter beginning July 1, 2008 for the initial start-up costs associated with the PBF Administrator and recover the cost in the DSM surcharge; confirmed that the load management, SolarSaver Pilot (SSP) and Residential Customer Energy Awareness programs shall remain with the electric utilities; and directed the electric utilities to continue to operate the DSM programs through June 30, 2009, after which transition period the electric utilities can compete for implementation of DSM programs as a subcontractor. The PUC issued its RFP for the PBF Administrator and proposals were received.

In December 2008, the PUC notified Science Applications International Corporation (SAIC) that it had been selected to continue negotiations with the PUC to become the PBF Administrator. The utilities had worked with SAIC to develop the PBF Administrator proposal selected by the PUC that included continued delivery of the existing energy efficiency programs by the utilities as subcontractor to SAIC. The PUC executed a PBF Administrator contract with SAIC in March 2009. HECO has since entered into discussions with SAIC on HECO’s role as a subcontractor to SAIC.

On December 15, 2008, the PUC ordered that the $50,000 collected by the utilities during the third quarter of 2008 was to be paid to the PUC. In a separate order, “Order Setting the Public Benefits Fee Surcharge for 2009” (Order), also dated December 15, 2008, the PUC established a Public Benefits Fund equal to 1% of estimated 2009 total revenues that would be used for the 2009 implementation of energy efficiency programs, of which 40% would be collected through the PBF Surcharge for use by the PBF Administrator, and 60% would be collected through the DSM Surcharge to be used by the utilities for their energy efficiency programs until those programs were transferred to the PBF Administrator. The 2009 budgets for the SSP Program and the two load management programs (Residential Direct Load Control and Commercial and Industrial Direct Load Control Programs) remained unaffected. The Order stated that the 60/40 split “roughly equates with the proportionate period of time that the commission expects the HECO Companies and the third-party administrator to provide services in 2009.” The utilities issued new PBF Surcharge and revised DSM Surcharge filings effective January 1, 2009.

The utilities filed new DSM program budgets and goals on January 20, 2009.

The Order also ended the expensing and collection of $50,000 per quarter as of January 1, 2009. The $100,000 collected in total during the third and fourth quarters of 2008, plus interest, was delivered to the PUC’s PBF fiscal agent, as instructed, on January 2, 2009. The utilities were ordered to transfer the collected PBF Surcharge revenues, less the revenue tax liabilities, to the PUC’s PBF fiscal agent beginning on March 1, 2009, and monthly thereafter.

The EE Docket D&O also provides for HECO’s recovery of DSM program costs and utility incentives. With respect to cost recovery, the PUC continues to permit recovery of reasonably-incurred DSM implementation costs, under the IRP framework. DSM utility incentives will be derived from a graduated performance-based schedule of net system benefits. In order to qualify for an incentive, the utility must meet cumulative MW and MWh reduction goals for its EE DSM programs in both the commercial and industrial sector, and the residential sector. The amount of the annual incentive is capped at $4 million for HECO, and may not exceed either 5% of the net system benefits, or utility earnings opportunities foregone by implementing DSM programs in lieu of supply-side rate based investments. Negative incentives will not be imposed for underperformance.

In 2007, HECO recorded incentives of $4 million. HELCO and MECO proposed goals for their programs, based on the goals established for HECO’s programs, but recorded no incentives in 2007. On May 21, 2007, the PUC clarified the 2007 and 2008 energy efficiency goals and the calculation of the DSM utility incentive, and granted HECO the ability to request program modifications and budget increases by letter request. Since that time, the PUC has approved budget increases and program modifications for various DSM programs. In June 2008, the PUC issued an order approving MECO’s proposed cumulative energy and demand savings goals for 2007 and 2008, but set MECO’s annual incentive cap at $320,000. Thus, in the second quarter of

2008, MECO recorded an incentive of $320,000 related to 2007. The PUC also issued an order approving HELCO’s proposed cumulative energy and demand savings goals for 2007 and 2008, and an annual incentive cap of $200,000. However, HELCO did not achieve those goals and, therefore, no incentives were earned by HELCO. The utilities’ DSM incentives for 2007 and 2008 were subject to adjustment based on the results of impact evaluation studies.

In December 2008, the results of the impact evaluation studies became available. The impact evaluation reduced actual DSM energy and demand savings for 2005 through 2007. As a result of the reduced savings, the utilities’ Lost Margin and Shareholder Incentives earned in 2005 and 2006 were reduced. In addition, MECO no longer met its 2007 goals for DSM utility incentives. As a result of these changes, the utilities accrued a refund to its customers of $1.4 million, including interest, in December 2008.

HECO and MECO surpassed their energy and demand savings goals for 2008 and earned their maximum DSM utility incentives of $4 million and $320,000, respectively. In its December 15, 2008 Order, in anticipation of the transfer of the DSM programs to the third-party administrator during 2009, the PUC decreased the maximum DSM utility incentive for HECO to $2 million for 2009 and decreased HELCO’s and MECO’s maximum incentives to $100,000 and $160,000, respectively, for 2009.

HECO filed its annual DSM Accomplishments and Surcharge Report (A&S Report) on March 31, 2009, which documents HECO’s portion of the refund for years 2005 and 2006 and its earned DSM utility incentive of $4 million. MECO filed its A&S Report on April 30, 2009, documenting its portion of the refund and its earned DSM utility incentive of $320,000.

Unlike the EE DSM programs (for which the utilities are eligible to become a subcontractor to the third-party administrator), load management DSM programs will continue to be administered by the utilities. HECO’s residential load management program includes a monthly electric bill credit for eligible customers who participate in the program, which allows HECO to disconnect the customer’s residential electric water heaters or central air conditioning systems from HECO’s system to reduce system load when deemed necessary by HECO. The commercial and industrial load management program provides an incentive on the portion of the demand load that eligible customers allow to be controlled or interrupted by HECO. This program includes small business direct load control and voluntary program elements.

In March and April 2009, HECO filed applications for three-year extensions, from 2010 through 2012, of the Commercial and Industrial Direct Load Control Program and the Residential Direct Load Control Program, respectively.

In April 2008, HECO filed an application for approval of a Dynamic Pricing Pilot Program and for recovery of the incremental costs of the program through the DSM Adjustment component of the IRP Cost Recovery Provision. Dynamic pricing is a type of demand response program that allows prices to change from normal tariff rates as system conditions change and encourages customer curtailment of load through price incentives when there is insufficient generation to meet a projected peak demand period. The proposed pilot program would run for approximately one year and test the effect of a demand response program on a sample of residential customers. The application is still pending at the PUC.

Avoided cost generic docket. In May 1992, the PUC instituted a generic investigation to examine the proxy method and formula used by the electric utilities to calculate their avoided energy costs and Schedule Q rates. In general, Schedule Q rates are available to customers with cogeneration and/or small power production facilities with a capacity of 100 kW or less who buy power from or sell power to the electric utility. The parties to the proceeding agreed that avoided fuel costs, except for Lanai and Molokai, would be determined using a computer production simulation model and agreed on certain parameters that would be used to calculate avoided costs. In March 2008, the PUC ordered that the new avoided energy cost rates and Schedule Q rates would go into effect on August 1, 2008. HECO, HELCO and MECO filed new avoided energy costs rates and Schedule Q rates, which were determined using the new differential revenue requirements “resource-in / resource-out” methodology instead of the proxy method. These rates were effective from August 1 through December 31, 2008, and the fuel component of the rates was adjusted monthly for changes in fuel prices.

On April 18, 2008, the PUC initiated a docket to examine the methodology for calculating Schedule Q electricity payment rates in the State of Hawaii. The proceeding was intended to examine new methodologies for calculating Schedule Q payment rates, with the intent of removing or reducing any linkages between the price of fossil fuels and the rate for non-fossil fuel generated electricity. The parties to the Energy Agreement agreed that all new renewable energy contracts are to be delinked from fossil fuel and that the utilities would seek to renegotiate existing PPAs with independent power producers (IPPs) that are based on fossil fuel prices to delink their energy payment rates from oil costs. Based on this understanding, the parties agreed to request that the PUC suspend the pending Schedule Q proceeding for a period of 12 months with a view to reviewing the necessity of the docket. On November 28, 2008, the PUC granted the request to suspend the Schedule Q proceeding for 12 months. On December 31, 2008, HECO, HELCO and MECO filed avoided energy costs rates and Schedule Q rates to be effective for 2009, subject to monthly adjustment of the fuel component of the rates for changes in fuel prices.

Integrated resource planning, requirements for additional generating capacity and adequacy of supply. The PUC issued an order in 1992 requiring the energy utilities in Hawaii to develop integrated resource plans (IRPs), which may be approved, rejected or modified by the PUC. The goal of integrated resource planning is the identification of demand- and supply-side resources and the integration of these resources for meeting near- and long-term consumer energy needs in an efficient and reliable manner at the lowest reasonable cost. The utilities’ proposed IRPs are planning strategies, rather than fixed courses of action, and the resources ultimately added to their systems may differ from those included in their 20-year plans. Under the PUC’s IRP framework, the utilities are required to submit annual evaluations of their plans (including a revised five-year program implementation schedule) and to submit new plans on a three-year cycle, subject to changes approved by the PUC. Prior to proceeding with the DSM programs, separate PUC approval proceedings must be completed.

The utilities were to be entitled to recover all appropriate and reasonable integrated resource planning and implementation costs, including the costs of DSM programs, either through a surcharge or through their base rates. Under procedural schedules for the IRP cost proceedings, the utilities were able to recover their incremental IRP costs in the month following the filing of their actual costs incurred for the year, subject to refund with interest pending the PUC’s final D&O approving recovery in the docket for each year’s costs. HELCO (since February 2001), HECO (since September 2005) and MECO (since December 2007) now recover IRP costs (which are included in O&M) through base rates. Previously, HECO, HELCO and MECO recovered their costs through a surcharge. The Consumer Advocate has objected to the recovery of $1.2 million (before interest) of the $4.0 million of incremental IRP costs incurred by the utilities during the 2002-2007 period, and the PUC’s decisions on the recovery of these costs are pending. Also, see Note 5 in HECO’s “Notes to Consolidated Financial Statements” and “Demand-side management programs” above.

The parties to the Energy Agreement agreed to seek to replace the IRP process with a new Clean Energy Scenario Planning (CESP) process, described in the Energy Agreement, intended to be used to determine future investments in transmission, distribution and generation that will be necessary to facilitate high levels of renewable energy production. Requests by the parties to the Energy Agreement to move to the CESP process were filed with the PUC on November 6, 2008, and the PUC acted on those requests by ordering the utilities and the Consumer Advocate to develop a joint proposal for a framework for the CESP process. On April 7, 2009, in conjunction with the Consumer Advocate, HECO, HELCO and MECO conducted public input meetings on a draft of their proposed CESP framework. The draft CESP framework revises the previous IRP framework and proposes a planning process to develop generation and transmission resource plan options for multiple 20-year planning scenarios. From these scenarios, the framework proposes the development of a 5-year Action Plan based on range of resource needs identified through the various scenarios analyzed. Furthermore, the framework proposes that the CESP include the identification of Renewable Energy Zones, or geographic areas of the islands of rich renewable energy resources in which infrastructure improvements should be focused. The framework also proposes that the CESP include the identification of any geographic areas of the distribution system in which distributed generation or demand-side management resources are of higher value. HECO and the Consumer Advocate filed a proposed CESP framework with the PUC on April 28, 2009. The parties committed to supporting reasonable and prudent investment in the ongoing maintenance and upgrade of the existing generation, transmission and distribution systems, unless the CESP process determines otherwise.

*HECO’s IRP.* On September 30, 2008, HECO filed its fourth IRP (IRP-4) covering a 20-year (2009-2028) planning horizon, subject to PUC approval. The IRP-4 preferred plan called for all future generation to be renewable. In addition, it called for conversion of a number of existing HECO-owned generating units to utilize biofuels and for continued aggressive implementation of DSM programs. In addition to CIP CT-1 scheduled for installation in mid-2009, HECO had plans to pursue the installation of a 100 MW biofueled CT at the same station in the 2011-2012 timeframe and to submit to the PUC a request for a waiver from the competitive bidding process to install this increment of additional firm capacity. The addition of two simple-cycle CTs would add to the system additional fast starting and ramping capability, which would facilitate integration of as-available generation (such as wind and solar) to the system. HECO also had plans to remove Waiau Unit 3, a 46 MW oil-fired cycling unit, from service after the second CT is in service, and would later determine whether to place the unit in emergency reserve status or to retire the unit. Subsequent to the filing of IRP-4, HECO is revisiting its plans to submit an application and waiver request for the second CT at Campbell Industrial Park given the uncertainty of future sales and peak demand.

When the necessary test biofuels are obtained, HECO plans to conduct a test on Kahe Unit 3 to evaluate the use of Low Sulfur Fuel Oil/biofuel blends in existing oil-fired steam units. Other renewable generation will be acquired via three renewable energy projects “grandfathered” from competitive bidding and from projects that are selected from proposals submitted in response to HECO’s 100 MW RFP for Non-Firm Energy (see “Competitive bidding proceeding” above).

On November 26, 2008, the PUC closed the HECO IRP-4 process and directed HECO to suspend all activities pursuant to the IRP framework to allow for resources to be diverted to the development of a CESP framework.

*HELCO’s IRP.* In May 2007, HELCO filed its third IRP. The plan included the installation of a nominal 16 MW steam turbine (ST-7) in 2009 at its Keahole Generating Station (see “Major projects” in Note 5 of HECO’s “Notes to Consolidated Financial Statements”). The plan also followed through on a commitment to have no new fossil-fired generation installed after ST-7. The plan anticipated increasing customer photovoltaic systems plus a 37 gigawatthours per year renewable energy resource in the 2014 to 2020 timeframe, a firm capacity renewable energy resource in 2022, energy efficiency (continuation of existing DSM programs) and CHP. In November 2007, HELCO and the Consumer Advocate filed a stipulated agreement which recommended that the PUC approve HELCO’s IRP-3 and in which HELCO agreed to make improvements to the IRP process and to submit evaluation reports. In January 2008, the PUC issued its D&O approving HELCO’s IRP-3 and required HELCO to submit annual evaluation reports and file its IRP-4 by May 31, 2010.

On November 26, 2008, the PUC suspended the HELCO IRP-4 process and directed HELCO to suspend all activities pursuant to the IRP Framework to allow for resources to be diverted to the development of a CESP framework.

*MECO’s IRP.* In April 2007, MECO filed its third IRP, which proposes multiple solutions to meet future energy needs on the islands of Maui, Lanai and Molokai, including renewable energy resources (such as photovoltaics, additional wind, biomass and waste-to-energy), energy efficiency (continuation of existing and addition of new DSM programs), technology (such as CHP and DG) and competitive bidding for generation or blocks of generation on Maui for 20 MW in each of 2011 and 2013 and 18 MW in 2024 which, under the utility parallel plan, could be located at its Waena site. In July 2008, the PUC approved MECO’s IRP-3 and directed MECO to submit evaluation reports, to make various improvements to the IRP process and to submit its IRP-4 by April 30, 2010.

On December 8, 2008, the PUC suspended the MECO IRP-4 process and directed MECO to suspend all activities pursuant to the IRP Framework to allow for resources to be diverted to the development of a CESP framework.

HECO’s 2009 CIP CT-1 and transmission line. See “CIP CT-1 and transmission line” in Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

Adequacy of supply.

*HECO*. HECO’s 2009 Adequacy of Supply (AOS) letter, filed in February 2009, indicated that HECO’s analysis estimates its reserve capacity shortfall to be approximately 30 MW in 2009, even with the addition of the CIP CT-1 scheduled to be installed in mid-2009, primarily because shortfalls are projected to occur before the unit is installed and will not be entirely alleviated once the unit is available for service. Generation shortfalls did not occur during the first quarter of 2009, in part because power demand was consistently less than forecasted primarily due to weather that was cooler than normal. Moreover, sustained maintenance efforts have resulted in a leveling in availability rates that had been declining since 2002, at levels that continue to be better than those for comparable units on the U.S. mainland. Barring unforeseen equipment failures, generation capacity shortfalls are not expected to occur prior to startup of CIP CT-1 later this year when reserve capacity conditions will be substantially improved.

To mitigate the projected reserve capacity shortfalls, HECO has implemented and is continuing to plan and implement mitigation measures, such as installing distributed generators at substations or other sites, implementing additional load management and other demand reduction measures, and pursuing efforts to improve the availability of generating units. HECO will operate at lower than desired reliability levels and take steps to mitigate the reserve capacity shortfall situation until the next generating unit is installed. Until sufficient generating capacity can be added to the system, HECO will experience a higher risk of generation-related customer outages.

After the scheduled mid-2009 addition of the CIP CT-1, and in recognition of the uncertainty underlying key forecasts, HECO reported in its 2009 AOS letter that it anticipates that its reserve capacity situation could range from a shortfall of 10 MW if demand is higher than expected to a surplus of 50 MW in a base case scenario for 2010, with the shortfalls higher and the surpluses lower in future years. HECO may seek, under the guidance of the Competitive Bidding Framework issued by the PUC in December 2006, a firm, dispatchable renewable resource to meet future needs, while continuing contingency planning activities. As noted under “HECO’s IRP” above, to address future needs HECO plans to pursue the installation of a second biofueled CT (100 MW) at its CIP generating station in the 2011-2012 timeframe, at which time it would remove a 46 MW oil-fired cycling unit from service (and later determine whether to place the unit in emergency reserve status or to retire the unit).

HECO’s gross peak demand was 1,327 MW in 2004, 1,273 MW in 2005, 1,315 MW in 2006, 1,261 MW in 2007 and 1,227 MW in 2008. Peak demand may vary from year to year, but over time, demand for electricity on Oahu is projected to increase. On occasions in 2004, 2005, 2006 and 2007, HECO issued public requests that its customers voluntarily conserve electricity as generating units were out for scheduled maintenance or were unexpectedly unavailable. In addition to making the requests, in 2005, 2006 and 2007, HECO on occasion remotely turned off water heaters for a number of residential customers who participate in its load-control program.

*HELCO*. HELCO’s 2009 Adequacy of Supply letter filed in January 2009 indicated that HELCO’s generation capacity for the next three years, 2009 through 2011, is sufficiently large to meet all reasonably expected demands for service and provide reasonable reserves for emergencies.

*MECO*. MECO’s 2009 Adequacy of Supply letter filed in January 2009 indicated that MECO’s generation capacity for the next three years, 2009 through 2011, is sufficient to meet the forecasted demands on the islands of Maui, Lanai and Molokai. MECO’s 2009 Adequacy of Supply letter also indicated that the date the next increment of additional firm generating capacity on Maui is needed has changed from 2014 to 2015 due primarily to a reduction in the forecast of peak demand.

The PPA between MECO and Hawaiian Commercial & Sugar Company (HC&S), which provides for 16 MW of firm capacity, continues in effect from year to year, subject to termination on written notice by either party of not less than two years. In July 2007, however, the parties agreed to not issue a notice of termination that would result in the termination of the PPA prior to the end of 2014.

On occasions in 2006 and 2007, MECO experienced lower than normal generation capacity due to the unexpected temporary losses of several of its generating units, and issued public requests that its customers voluntarily conserve electricity. No such requests were issued in 2008.

December 2008 outage. On December 26, 2008, an island-wide outage occurred on the island of Oahu that resulted in a loss of electric service to HECO customers ranging from approximately 7 to 20 hours.

On January 12, 2009, the PUC issued an order initiating an investigation of the outage to address the following preliminary issues: (1) what caused the outage; (2) if lightning strikes during the lightning storm initially caused the power outage, could HECO have reasonably prevented damaging effects of lightning strikes to prevent the power outage from initially occurring; (3) through reasonable measures, could HECO have prevented the power outage or prevented it from becoming island-wide; (4) could HECO have reasonably shortened the duration of the power outage and restored power more quickly to customers; (5) what are the necessary steps to prevent similar power outages in the future, to minimize the scope and duration of similar power outages and to improve HECO’s response to such outages in the future; and (6) what penalties, if any, should be imposed on HECO.

On March 31, 2009, HECO submitted its outage report that was prepared by its expert consultant, POWER Engineers, Inc. (POWER). The outage report concluded that the island-wide outage was triggered by lightning strikes on or near HECO’s 138 kilovolt (kV) transmission system, one of which resulted in a short-circuit over all three phases of the Kahe-Waiau 138 kV line, setting in motion a series of events that resulted in the necessary loss of customer load, loss of generation and the eventual island-wide shut down of HECO’s system. POWER found that: (1) the HECO system was in proper operating condition and was appropriately staffed at the time of the lightning storm, and (2) HECO’s restoration efforts were prudent and allowed for the restoration of power as quickly as possible under the circumstances, while also ensuring the safety and protection of HECO’s employees and customers and preventing any further or permanent damage to the electric system from attempts to bring the system back too quickly. POWER made a number of recommendations, largely technical in nature, for HECO to consider that may reduce the likelihood of the recurrence of a similar power outage or minimize the duration of an outage should one occur in the future.

The Consumer Advocate and the PUC will review the outage report and conduct their own independent reviews.

Management cannot at this time predict the outcome of the PUC’s or Consumer Advocate’s investigations or their impact on HECO.

Intra-governmental wheeling of electricity. In June 2007, the PUC initiated a docket to examine the feasibility of implementing intra-governmental wheeling of electricity in the State of Hawaii. The issues in the proceeding adopted by the PUC include (1) identifying what impact, if any, wheeling will have on Hawaii’s electric industry, (2) addressing interconnection matters, (3) identifying the costs to utilities, (4) identifying any rate design and cost allocation issues, (5) considering the financial cost and impact on non-wheeling customers, (6) identifying any power back-up issues, (7) addressing how rates would be set, (8) identifying the environmental impacts, (9) identifying and evaluating the various forms of intra-governmental wheeling and (10) identifying and evaluating the resulting impact to any and all governmental entities, including but not limited to economic, feasibility and liability impacts. Parties to this proceeding include HECO, HELCO, MECO, Kauai Island Utility Cooperative and the Consumer Advocate, as well as governmental agencies (the DOD, the Department of Business, Economic Development and Tourism, the City and County of Honolulu and the Counties of Hawaii, Maui and Kauai), an environmental group, and two renewable energy developers. Two renewable energy contractors and a renewable energy developer also have been granted more limited participant status.

In the fourth quarter of 2008, the Department of Business, Economic Development and Tourism requested (in accordance with the provisions of the Energy Agreement) that the PUC suspend the pending intra-governmental wheeling docket for a period of 12 months while the parties to the agreement evaluate the necessity of the docket in view of the other agreements of the parties. The PUC approved the request, provided that the PUC, at its option, may re-institute this docket at an earlier date.

Energy Independence and Security Act of 2007. On February 11, 2009, the PUC issued an order initiating an investigation whether to implement any of four new federal standards, as required by the Public Utility Regulatory Policies Act of 1978, as amended by the Energy Independence and Security Act of 2007. In summary, the four standards are as follows: 1) each electric utility shall integrate energy efficiency resources into utility, state and regional plans and adopt policies establishing cost-effective energy efficiency as a priority resource; 2) electric utility rates shall align utility incentives with the delivery of cost-effective energy efficiency and promote energy efficiency investments; 3) each state shall consider requiring that, prior to undertaking investments in non-advanced grid technologies, an electric utility demonstrate to the state that it considered an investment in a qualified smart grid system; and 4) all electricity purchasers shall be provided direct access to pricing, usage and power source information from their electricity provider. The PUC named HECO, HELCO, MECO, Kauai Island Utility Cooperative and the Consumer Advocate as parties in this proceeding. The PUC directed the parties to file within 90 days of the date of the order a position statement on whether the PUC should adopt, modify, or decline to adopt the standards, and procedural comments on how these issues should be considered in this docket or in a separate proceeding. Management can not predict the outcome of this proceeding.

***Collective bargaining agreements***. See “Collective bargaining agreements” in Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

***Legislation and regulation.*** Congress and the Hawaii legislature periodically consider legislation that could have positive or negative effects on the utilities and their customers. Also see “Hawaii Clean Energy Initiative” and “Environmental regulation” in Note 5 of HECO’s “Notes to Consolidated Financial Statements” and “Emergency Economic Stabilization Act of 2008 and American Economic Recovery and Reinvestment Act of 2009” above.

Renewable Portfolio Standard. Hawaii has an RPS law requiring electric utilities to meet an RPS of 8% of KWH sales by December 31, 2005, 10% by December 31, 2010, 15% by December 31, 2015, and 20% by December 31, 2020. The RPS law provides that at least 50% of the RPS targets must be met by electrical energy generated using renewable energy sources, such as wind or solar, versus from the electrical energy savings from renewable energy displacement technologies (such as solar water heating) or from energy efficiency and conservation programs. These standards may be met by the electric utilities on an aggregated basis and were met in 2005 when the electric utilities attained an RPS of 11.7%. The utilities are committed to achieving these goals, as well as the higher goals proposed in the Energy Agreement (discussed below); however, due to risks such as potential delays in IPPs being able to deliver contracted renewable energy (see risks under Forward-looking Statements on pages 2 and 3), it is possible the electric utilities may not attain the required renewable percentages in the future, and management cannot predict the future consequences of failure to do so (including potential penalties to be assessed by the PUC).

The RPS law was amended in 2006 to add provisions for penalties if the utility fails to meet its RPS requirements, to require the PUC to conduct a hearing prior to assessing penalties, and to amend the criteria for waiver of the penalties by the PUC. In January 2007, the PUC opened a new docket (RPS Docket) to examine Hawaii’s RPS law, to establish the appropriate penalties for failure to meet RPS targets and to determine the circumstances under which penalties should be levied. The issues also included the appropriate utility ratemaking structure to include in the RPS framework to provide incentives that encourage electric utilities to use cost-effective renewable energy resources found in Hawaii to meet the RPS, while allowing for deviation from the standards in the event that the standards cannot be met in a cost-effective manner, or as a result of circumstances beyond the control of the utility that could not have been reasonably anticipated or ameliorated.

In December 2007, the PUC issued a D&O approving a stipulated RPS framework to govern electric utilities’ compliance with the RPS law. In a follow up order in December 2008, the PUC approved a penalty of $20 for every MWh that an electric utility is deficient under Hawaii’s RPS law. The PUC found that a penalty, in a specific dollar per MWh amount, which the PUC may assess against a non-compliant utility, will provide clarity and transparency to the RPS Framework. The PUC noted, however, that this penalty may be reduced, in the

PUC’s discretion, due to events or circumstances that are outside an electric utility’s reasonable control, to the extent the event or circumstance could not be reasonably foreseen and ameliorated, as described in the RPS law and in the RPS Framework. In addition, the PUC ordered that: (1) any penalties assessed against HECO and its subsidiaries for failure to meet the RPS will go into the public benefits fund account used to support energy efficiency and DSM programs and services, which will be operated by a third-party administrator, unless otherwise directed; and (2) the utilities will be prohibited from recovering any RPS penalty costs through rates.

In its December 2007 D&O, the PUC deferred the RPS incentive framework to a new generic docket (Renewable Energy Infrastructure Program or REIP Docket). The parties to the REIP Docket include the electric utilities, the Consumer Advocate, an environmental organization and Hawaii Renewable Energy Alliance (HREA). Public hearings were held in May 2008.

The Renewable Energy Infrastructure Program proposed by HECO in the RPS docket consists of two components: (1) renewable energy infrastructure projects that facilitate third-party development of renewable energy resources, maintain existing renewable energy resources and/or enhance energy choices for customers, and (2) the creation and implementation of a temporary renewable energy infrastructure surcharge to recover the capital costs, deferred costs for software development and licenses, and/or other relevant costs approved by the PUC. These costs would be removed from the surcharge and included in base rates in the utility’s next rate case. In July 2008, statements of position were filed with the PUC, in which the Consumer Advocate recommended approval of, HREA supported, and the environmental organization did not oppose the REIP proposed by HECO. In October 2008, pursuant to the PUC’s request, the parties to the docket informed the PUC, among other things, that the parties (1) have reached an agreement on all of the issues in the docket, (2) agree that it is appropriate that the PUC approve the utilities’ proposed REIP and related REIP surcharge, (3) agree that the record in the proceeding is complete and ready for PUC decision-making, and (4) waive an evidentiary hearing. In February 2009, the PUC issued to the parties information requests prepared by its consultant.

The Energy Agreement includes a provision to seek legislation to revise the RPS law to require electric utilities to meet an RPS of 25% by 2020 and 40% by 2030. In addition, the Energy Agreement includes a provision to eliminate energy efficiency and conservation entirely from consideration as contributors to the RPS targets after 2014. Furthermore, the Energy Agreement includes a provision under which imported biofuel generation could not account for more than 30% of the RPS target through 2015.

In the Energy Agreement, the parties also agreed that the REIP may be modified to incorporate changes for the CEIS mechanism, provided the appropriate notices to the public regarding the changes are made.

On November 28, 2008, HECO and the Consumer Advocate filed a joint letter informing the PUC that the proposed REIP Surcharge is substantially similar to the CEIS and that the REIP Surcharge proposal satisfies the Energy Agreement commitment for the filing of an implementation procedure for the CEIS.

Management cannot predict the outcome of these proceedings and processes.

Net energy metering. Hawaii has a net energy metering law, which requires that electric utilities offer net energy metering to eligible customer generators (i.e., a customer generator may be a net user or supplier of energy and will make payment to or receive credit from the electric utility accordingly).

In 2005, the Legislature amended the net energy metering law by, among other revisions, authorizing the PUC, by rule or order, to increase the maximum size of the eligible net metered systems and to increase the total rated generating capacity available for net energy metering. In April 2006, the PUC initiated an investigative proceeding on whether the PUC should increase (1) the maximum capacity of eligible customer-generators to more than 50 kW and (2) the total rated generating capacity produced by eligible customer-generators to an amount above 0.5% of an electric utility’s system peak demand. The parties to the proceeding include HECO, HELCO, MECO, Kauai Island Utility Cooperative (KIUC), the Consumer Advocate, a renewable energy organization and a solar vendor organization. In March 2008, the PUC approved a stipulated agreement filed by the parties (except for KIUC, which has its own stipulated agreement) to increase the maximum size of the eligible customer-generators from 50 kW to 100 kW and the system cap from 0.5% to 1.0% of system peak demand, to reserve a certain percentage of the 1.0% system peak demand for generators 10 kW or less and to consider in the IRP process any further increases in the maximum capacity of customer-generators and the system cap. The PUC further required the utilities: (1) to consider specific items relating to net energy metering in their respective IRP processes, (2) to evaluate the economic effects of net energy metering in future rate case proceedings and (3) to design and propose a net energy metering pilot program for the PUC’s review and approval that will allow, on a trial basis, the use of a limited number of larger generating units (i.e., at least 100 kW to 500 kW, and may allow for larger units) for net energy metering purposes.

In April 2008, the electric utilities applied for PUC approval of a proposed four-year net energy metering pilot program to evaluate the effects on the grid of units larger than the currently approved maximum size. The program will consist of analytical investigations and field testing and is designed for a limited number of participants that own (or lease from a third party) and operate a solar, wind, biomass, or hydroelectric generator, or a hybrid system. The electric utilities propose to recover program costs through the IRP cost recovery provision.

In 2008, the net energy metering law was again amended to authorize the PUC, by rule or order, to modify the maximum size of the eligible net metered systems and evaluate on an island-by-island basis whether to exempt an island or utility grid system from the total rated generating capacity limits available for net energy metering.

In the Energy Agreement, the parties agreed to seek to remove system-wide caps on net energy metering. Instead, they plan to seek to limit DG interconnections on a per circuit basis and to replace net energy metering with an appropriate feed-in tariff and new net metered installations that incorporate time-of-use metering equipment for future full scale implementation of time-of-use metering and sale of excess energy.

On February 13, 2009, the parties to the Net Energy Metering proceeding filed a joint letter pointing out that the Energy Agreement calls for the development of a feed-in tariff that may eventually replace net energy metering and that the outcome of the feed-in tariff proceeding may influence the future direction of net energy metering. The parties proposed to provide an update on the proposed pilot program within a month after the completion of the feed-in tariff proceeding.

On December 3, 2008, HELCO, MECO and the Consumer Advocate filed stipulations to increase their net energy metering system caps from 1% to 3% of system peak demand (among other changes). On December 26, 2008, the PUC issued an order approving the proposed caps, but directed the parties to file a proposed plan to address the provisions regarding net energy metering in the Energy Agreement within 45 days. In February 2009, the utilities and the Consumer Advocate filed a joint letter requesting an extension until May 22, 2009 to submit the proposed plan and further agreed that any potential increases to the net energy metering limits be reviewed in each of the utilities’ Clean Energy Scenario Planning process.

DSM programs. See “Demand-side management programs” above.

Non-fossil fuel purchased power contracts. In 2006, a law was enacted that required that the PUC establish a methodology that removes or significantly reduces any linkage between the price paid for non-fossil-fuel-generated electricity under future power purchase contracts and the price of fossil fuel, in order to allow utility customers to receive the potential cost savings from non-fossil fuel generation (in connection with the PUC’s determination of just and reasonable rates in purchased power contracts).

Greenhouse gas emissions reduction. In July 2007, Act 234 became law, which requires a statewide reduction of greenhouse gas (GHG) emissions by January 1, 2020 to levels at or below the statewide GHG emission levels in 1990. It also establishes a task force, comprised of representatives of state government, business (including the electric utilities), the University of Hawaii and environmental groups, which is charged with preparing a work plan and regulatory approach for “implementing the maximum practically and technically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases” to achieve 1990 statewide GHG emission levels. The electric utilities are participating in the Task Force, as well as in initiatives aimed at reducing their GHG emissions, such as those to be undertaken under the Energy Agreement. Because the full scope of the Task Force report remains to be determined and regulations implementing Act 234 have not yet been promulgated, management cannot predict the impact of Act 234 on the electric utilities and the Company.

If the U.S. Environmental Protection Agency (EPA) grants a waiver to California under the Clean Air Act (CAA) to allow state government control of GHG emissions from new motor vehicles sold in California and the Hawaii legislature passes a pending bill adopting the California motor vehicle emission standards, the ability of Hawaii to meet Act 234’s GHG reduction targets should be enhanced. Although several bills addressing GHG emission reductions also have been introduced in Congress, none has yet been adopted.

On April 7, 2007, in Massachusetts v. EPA, the U.S. Supreme Court ruled that the EPA has the authority to regulate GHG emissions from motor vehicles under the Clean Air Act (CAA or the Act). The Court further ruled that the EPA must determine whether or not motor vehicle GHG emissions cause or contribute to air pollution which may be reasonably anticipated to endanger public health or welfare (known as an “endangerment finding”), or whether the science about GHGs was too uncertain to make a reasoned decision. On July 11, 2008, the EPA issued its advance notice of proposed rulemaking (ANPR) inviting public comment on the benefits and ramifications of regulating GHGs under the CAA.

On March 10, 2009, the EPA issued a proposed rule under the CAA for the monitoring and reporting of GHG emissions. The rule would apply to fossil fuel suppliers and industrial gas suppliers, as well as to direct GHG emitters, including the electric utilities. As proposed, the rule only requires that sources above certain threshold levels monitor and report GHG emissions – it would not require control of GHGs. Comments on the proposed GHG monitoring and reporting rule must be received by the EPA on or before July 9, 2009.

In response to Massachusetts v. EPA, the EPA proposed an endangerment finding that current and projected concentrations of six key GHGs in the atmosphere threaten the public health and welfare of current and future generations and that motor vehicle emissions that contain four of the six GHGs identified in the endangerment finding contribute to climate change. The EPA has scheduled two public hearings on the proposed endangerment finding. The proposed endangerment finding was published in the Federal Register on April 24, 2009, and comments are due by June 23, 2009. The proposed finding, if adopted, would not require any specific action by industry and the EPA noted that an endangerment finding under one part of the CAA would not automatically trigger regulation under other parts of the CAA. Since, however, the CAA’s language regarding endangerment findings due to motor vehicle emissions is virtually identical to its language regarding stationary source emissions, such as those emitted from the electric utilities’ facilities, there is little doubt that the EPA will make the same or similar endangerment finding regarding GHG emissions from stationary sources. In the announcement of the proposed endangerment finding, the EPA stressed that the agency and President Obama’s administration prefer comprehensive legislation to address climate change due to GHG emissions and to create a framework for a clean energy economy.

Although, the proposed GHG reporting rule and proposed endangerment finding do not require control of GHGs, they are seen as necessary prerequisites for GHG reduction requirements under the CAA. The electric utilities, therefore, are reviewing the proposals and evaluating whether to submit comments to the EPA.

Renewable energy. In 2007, a law was enacted that stated that the PUC may consider the need for increased renewable energy in rendering decisions on utility matters. Due to this measure, it is possible that, if energy from a renewable source were more expensive than energy from fossil fuel, the PUC may still approve the purchase of energy from the renewable source.

In 2008, a law was enacted to promote and encourage the use of solar thermal energy. This measure will require the installation of solar thermal water heaters in residences constructed after January 1, 2010, but allow for limited variances in cases where installation of solar water heating is deemed inappropriate. The measure will establish standards for quality and performance of such systems. Also in 2008, a law was enacted that is intended to facilitate the permitting of larger (200 MW or greater) renewable energy projects. The Energy Agreement includes several undertakings by the utilities to integrate solar energy into the electric grid.

Biofuels. In 2007, a law was enacted with the stated purpose of encouraging further production and use of biofuels in Hawaii. It established that biofuel processing facilities in Hawaii are a permitted use in designated agricultural districts and established a program with the Hawaii Department of Agriculture to encourage the production in Hawaii of energy feedstock (i.e., raw materials for biofuels).

In 2008, a law was enacted that encourages the development of biofuels by authorizing the Hawaii Board of Land and Natural Resources to lease public lands to growers or producers of plant and animal material used for the production of biofuels.

The utilities have agreed in the Energy Agreement to test the use of biofuels in their generating units and, if economically feasible, to connect them to the use of biofuels. For its part, the State agrees to support this testing and conversion by expediting all necessary approvals and permitting. The Energy Agreement recognizes that, if such conversion is possible, HECO’s requirements for biofuels would encourage the development of a local biofuels industry.

For a discussion of environmental legislation and regulations, see “Environmental regulation” in Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

At this time, it is not possible to predict with certainty the impact of the foregoing legislation or legislation that is, or may in the future be, proposed.

### Other developments

Advanced Meter Infrastructure (AMI). On December 1, 2008, the utilities filed an AMI project application with the PUC for approval to implement AMI, covering approximately 451,000 meters (293,000 on Oahu, 92,000 on the island of Hawaii and 66,000 on Maui). The application embodies the goals of the HCEI, which is further described in Note 5 of HECO’s “Notes to Consolidated Financial Statements.” The parties to the proceeding filed a proposed stipulated procedural order, which includes hearings in September 2009 and was approved in April 2009.

HECO continues to operate a Sensus Metering Systems AMI network, currently consisting of 8,000 advanced meters at both residential and commercial customer sites and completed the first phase of its investigation of Meter Data Management (MDM) software. The MDM will ultimately capture the increased data volume from advanced meters and will serve as the data warehouse and knowledge store for current and future utility applications.

AMI technology enables automated meter reading, improved field service operations, more accurate meter readings, time-of-use pricing and conservation options for HECO customers. The utilities continue to explore other utility applications such as distribution circuit monitoring and water heater and air conditioning load control for improved residential and commercial customer reliability.

***Commitments and contingencies***. See Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

***Recent accounting pronouncements and interpretations***. See Note 7 of HECO’s “Notes to Consolidated Financial Statements.”

### FINANCIAL CONDITION

### Liquidity and capital resources

Despite the recent unprecedented deterioration in the capital markets and tightening of credit, HECO believes that its ability, and that of its subsidiaries, to generate cash, both internally from operations and externally from issuances of equity and debt securities, commercial paper and lines of credit, is adequate to maintain sufficient liquidity to fund their capital expenditures and investments and to cover debt, retirement benefits and other cash requirements in the foreseeable future.

HECO’s consolidated capital structure was as follows as of the dates indicated:

*(in millions)*

|  | March 31, 2009 |  | December 31, 2008 |  |
| --- | ---: | ---: | ---: | ---: |
| Short-term borrowings | $29 | 1% | $42 | 2% |
| Long-term debt | 908 | 42 | 905 | 42 |
| Preferred stock | 34 | 2 | 34 | 1 |
| Common stock equity | 1,193 | 55 | 1,189 | 55 |
|  | $2,164 | 100% | $2,170 | 100% |

72

As of May 1, 2009, the S&P and Moody’s ratings of HECO securities were as follows:

|  | S&P |  | Moody’s |  |
| --- | --- | --- | --- | --- |
| Commercial paper | A-2 |  | P-2 |  |
| Special purpose revenue bonds |  |  |  |  |
| (principal amount noted in parentheses, senior unsecured, insured as follows): |  |  |  |  |
| Ambac Assurance Corporation ($0.2 billion) | A |  | Baa1 | \* |
| Financial Guaranty Insurance Company ($0.3 billion) | BBB | \* | Baa1 | \* |
| MBIA Insurance Corporation ($0.3 billion) | AA- | \*\* | Baa1 | \*\* |
| Syncora Guarantee Inc. (formerly XL Capital Assurance Inc.) ($0.1 billion) | BBB | \* | Baa1 | \* |
| HECO-obligated preferred securities of trust subsidiary | BB+ |  | Baa2 |  |
| Cumulative preferred stock (selected series) | Not rated |  | Baa3 |  |

The above ratings reflect only the view of the applicable rating agency at the time the ratings are issued, from whom an explanation of the significance of such ratings may be obtained. Such ratings are not recommendations to buy, sell or hold any securities; such ratings may be subject to revision or withdrawal at any time by the rating agencies; and each rating should be evaluated independently of any other rating. HECO’s overall S&P corporate credit rating is BBB/Stable/A-2. HECO’s issuer rating by Moody’s is Baa1 and Moody’s outlook for HECO is “stable.”

\* Rating corresponds to HECO’s rating (senior unsecured debt rating by S&P or issuer rating by Moody’s) because, as a result of rating agency actions to lower or withdraw the ratings of these bond insurers after the bonds were issued, HECO’s current ratings are either higher than the current rating of the applicable bond insurer or the bond insurer is not rated.

\*\* Following MBIA’s announced restructuring in February 2009, the revenue bonds issued for HECO and its subsidiaries and insured by MBIA have been reinsured by MBIA Insurance Corp. of Illinois (MBIA Illinois), whose financial strength rating by S&P is AA-. Moody’s has announced it will assign ratings to the reinsured municipal securities based on the higher of its insurance financial strength rating of MBIA Illinois or the published underlying rating. The insurance financial strength rating of MBIA Illinois by Moody’s is Baa1, which is the same as Moody’s issuer rating for HECO.

The rating agencies use a combination of qualitative measures (e.g., assessment of business risk that incorporates an analysis of the qualitative factors such as management, competitive positioning, operations, markets and regulation) as well as quantitative measures (e.g., cash flow, debt, interest coverage and liquidity ratios) in determining the ratings of HECO securities. In November 2008, S&P affirmed its corporate credit ratings and “stable” outlook for HECO. S&P’s rating outlook indicates the potential direction of a possible rating change in the coming 6 to 24 months. In November 2008, S&P stated:

The stable outlook reflects our expectation that, for now, HECO appears to have reasonable but not certain prospects for maintaining its existing financial profile, which is weak for the rating. Multiple near-term challenges face the company and include the uncertainties of the cost and feasibility impacts of the CEI \[Hawaii Clean Energy Initiative\], the potential for a significant reduction in electric sales in 2009 (due to economic contraction, energy efficiency initiatives, and customer response to high prices), and a recent softening in leading economic indicators. These challenges suggest that a negative outlook or downward revision to the ratings could be possible over the outlook horizon, as further weakening in the financial profile will not support ratings, and near-term business risk will be elevated until the particulars of the CEI are in place and prove to be supportive. Consistent, timely rate relief will continue to be key, and could offset or mitigate the effects of a declining economic environment, but decoupling or other measures are not expected to be available to the company before late 2009 or early 2010. Given these challenges, higher ratings are not foreseen during the outlook horizon and would need to be accompanied by sustained and improved financial performance.

S&P designates business risk profiles as “excellent,” “strong,” “satisfactory,” “weak” or “vulnerable.” S&P stated in November 2008 that: “HECO’s ‘strong’ business profile reflects its ownership of regulated utility assets, which serve about 95% of Hawaii’s population.”

S&P’s financial risk designations are “minimal,” “modest,” “intermediate,” “aggressive” and “highly leveraged.” In November 2008, S&P indicated that “\[t\]he consolidated financial profile is ‘aggressive,’ reflecting in part the very heavy debt imputation Standard & Poor’s Rating Services applies to HECO for its long-term power purchase agreements (PPAs).”

In September 2008, Moody’s maintained its ratings and stable outlook for HECO. Moody’s stated, “The rating could be downgraded should weaker than expected regulatory support emerge at HECO, including the continuation of regulatory lag, which ultimately causes earnings and sustainable cash flows to suffer.” To that end, if the utilities’ financial ratios declined on a permanent basis such that the Adjusted Cash Flow (net cash flow from operations less net changes in working capital items) to Adjusted Debt fell below 17% (20% as of June 30, 2008-latest reported by Moody’s) or Adjusted Cash Flow to Adjusted Interest declined to less than 3.6x (4.9x as of June 30, 2008-latest reported by Moody’s) for an extended period, the rating could be lowered.

Information about HECO’s short-term borrowings (other than from MECO), HECO’s line of credit facilities and special purpose revenue bonds authorized by the Hawaii legislature for issuance for the benefit of the utilities was as follows:

*(in millions)*

| Short-term borrowings | Three months ended March 31, 2009 Average balance | End-of-period balance | December 31, 2008 |
| --- | ---: | ---: | ---: |
| Commercial paper | $1 | $— | $— |
| Borrowings from affiliates | 23 | 29 | 42 |
| Line of credit facilities 1 |  |  |  |
| Future capacity under line of credit facility expiring March 31, 2011 2 |  | 175 | 175 |
| Undrawn capacity under line of credit facility expiring September 8, 2009 |  | 75 | 75 |
| **Special purpose revenue bonds authorized for issue** |  |  |  |
| 2005 legislative authorization (expiring June 30, 2010)-HELCO |  | $20 | $20 |
| 2007 legislative authorization (expiring June 30, 2012) |  |  |  |
| HECO |  | 260 | 260 |
| HELCO |  | 115 | 115 |
| MECO |  | 25 | 25 |
| Total special purpose revenue bonds available for issue |  | $420 | $420 |

1 At May 1, 2009, there was no outstanding commercial paper balance and the line of credit facilities were undrawn. HECO may seek to modify credit facilities in accordance with the expedited approval process approved by the PUC, including to increase the amount of credit available under an agreement, and/or to enter into new lines of credit, as management deems appropriate.

2 HECO has filed with the PUC a request for expedited approval of Amendment No. 2 (which the “Required Lenders,” as defined in the agreement, have signed) to a $175 million credit facility expiring March 31, 2011. Among other things, Amendment No. 2 eliminates from the credit agreement representations relating to the funded status of HECO’s pension plan, which are not currently correct. HECO does not anticipate needing to draw on this credit facility prior to obtaining PUC approval of the Amendment. However, if HECO needs to draw under, or issue commercial paper against, this credit facility, HECO will seek to obtain from the lenders waivers to the condition to their obligations to lend that this representation be correct at the time of each borrowing.

HECO utilizes short-term debt, principally commercial paper, to support normal operations and for other temporary requirements. HECO also borrows short-term from HEI for itself and on behalf of HELCO and MECO, and HECO may borrow from or loan to HELCO and MECO short-term. The intercompany borrowings among the utilities, but not the borrowings from HEI, are eliminated in the consolidation of HECO’s financial statements. At March 31, 2009, HECO had $29 million and $25 million of short-term borrowings from HEI and MECO, respectively, and HELCO had $67 million of short-term borrowings from HECO. HECO had an average outstanding balance of commercial paper for the first quarter of 2009 of $1 million and had no commercial paper outstanding at March 31, 2009. Management believes that, if HECO’s commercial paper ratings were to be downgraded or if credit markets were to further tighten, it would be more difficult and expensive to sell commercial paper, or HECO might not be able to sell commercial paper.

Revenue bonds are issued by the Department of Budget and Finance of the State of Hawaii to finance capital improvement projects of HECO and its subsidiaries, but the source of their repayment are the unsecured obligations of HECO and its subsidiaries under loan agreements and notes issued to the Department, including HECO’s guarantees of its subsidiaries’ obligations. The payment of principal and interest due on all revenue bonds currently outstanding are insured either by Ambac Assurance Corporation (Ambac), Financial Guaranty Insurance Company (FGIC), MBIA Insurance Corporation (MBIA) or Syncora Guarantee Inc. (Syncora) (formerly XL Capital Assurance Inc.). The currently outstanding revenue bonds were initially issued with S&P and Moody’s ratings of AAA and Aaa, respectively, based on the ratings at the time of issuance of the applicable bond insurer. Beginning in 2008, however, ratings of Ambac, MBIA, FGIC and XLCA (now Syncora) were downgraded and/or withdrawn by S&P and Moody’s resulting in a downgrade of the bond ratings of all of the bonds as shown in the ratings table above. Management believes that if HECO’s ratings were to be downgraded, or if credit markets further tighten, it could be more difficult and/or expensive to sell bonds in the future.

Operating activities provided $101 million in net cash during the first three months of 2009. Investing activities during the same period used net cash of $78 million for capital expenditures, net of contributions in aid of construction. Financing activities for the same period used net cash of $26 million, primarily due to a $12 million net decrease in short-term borrowings, the payment of $11 million of common and preferred dividends and a $6 million decrease in cash overdraft, partly offset by drawdown of $3 million of SPRB proceeds.

The PUC must approve issuances, if any, of equity and long-term debt securities by HECO, HELCO and MECO. In October 2008, HECO, HELCO and MECO filed with the PUC an application for approval of one or more special purpose revenue bond financings under the 2007 legislative authorization identified above, with the first such financing anticipated to be in 2009 if the PUC approves the application and market conditions are satisfactory. On April 20, 2009, HECO, HELCO and MECO filed with the PUC an application for the approval of the sale of each company’s common stock (HECO’s sale to HEI of up to $120 million and HELCO’s and MECO’s sales to HECO of up to $30 million and $7 million, respectively), and the purchase of the HELCO and MECO common stock by HECO, all in 2009.

### Bank

### RESULTS OF OPERATIONS

*(in thousands)*

|  | Three months ended March 31,% 2009 | 2008 | change | Primary reason(s) for significant change |
| --- | ---: | ---: | ---: | --- |
| Revenues | $82,032 | $105,844 | (22) | Lower interest income primarily due to lower earning asset balances as a result of the balance sheet restructuring in June 2008 and lower yields on earning assets due to the lower interest rate environment |
| Operating income | 17,121 | 23,363 | (27) | Higher net interest income and lower noninterest expense, more than offset by higher provision for loan losses and lower noninterest income |
| Net income | 10,882 | 14,576 | (25) | Lower operating income |

See “Economic conditions” in the “HEI Consolidated” section above.

***Net interest margin and other factors***. Earnings of ASB depend primarily on net interest income, which is the difference between interest earned on earning assets and interest paid on costing liabilities. The current interest rate environment is very volatile due to disruptions in the financial markets and these conditions may have a negative impact on ASB’s net interest margin.

Loan originations and purchases of loans and mortgage-related securities are ASB’s primary sources of earning assets. ASB’s loan volumes and yields are affected by market interest rates, competition, demand for financing, availability of funds and management’s responses to these factors. As of March 31, 2009, ASB’s loan portfolio mix, net, consisted of 70% residential loans, 13% commercial loans, 9% consumer loans and 8% commercial real estate loans. As of December 31, 2008, ASB’s loan portfolio mix, net, consisted of 70% residential loans, 14% commercial loans, 9% consumer loans and 7% commercial real estate loans.

Deposits continue to be the largest source of funds for ASB and are affected by market interest rates, competition and management’s responses to these factors. Competition for deposits and the level of short-term interest rates have made it difficult to retain deposits and control funding costs, and deposit retention and growth will remain challenges in the current environment. Advances from the FHLB of Seattle and securities sold under agreements to repurchase continue to be additional sources of funds. As of March 31, 2009, ASB’s costing liabilities consisted of 91% deposits and 9% other borrowings. As of December 31, 2008, ASB’s costing liabilities consisted of 86% deposits and 14% other borrowings.

As of March 31, 2009, the bank’s investment portfolio consisted of 50% mortgage-related securities issued by Federal National Mortgage Association (FNMA), Federal Home Loan Mortgage Corporation (FHLMC) or Government National Mortgage Association (GNMA), and 50% private-issue mortgage-related securities. As of December 31, 2008, the bank’s investment portfolio consisted of 9% federal agency obligations, 46% mortgage-related securities issued by FNMA, FHLMC or GNMA and 45% private-issue mortgage-related securities.

Principal and interest on mortgage-related securities issued by FNMA, FHLMC and GNMA are guaranteed by the issuer, and the securities carry implied AAA ratings. Private-issue mortgage-related securities carry a risk of loss due to delinquencies, foreclosures, and losses in the mortgage loans collateralizing the securities. Further deterioration in the U.S. residential housing market continues to pressure non-agency Residential Mortgage-Backed Securities (RMBS) held in the investment portfolio. The velocity of economic decline has exacerbated already weak home sales, which are impacted by borrowers unable to secure financing but also by those defaulting on current loans as a result of unemployment trends or payment shocks. The flood of inventory as a result of foreclosures has pressured prices and thus the credit of securities held in the portfolio. Those originated within the last 2-3 years have experienced the greatest pressure as borrowers purchasing homes at the peak of the market have experienced price declines that have eroded any remaining equity in their properties. As of March 31, 2009, non-agency RMBS represented 50% of the portfolio. 9% of the portfolio was rated non-investment grade by at least one of the major rating agencies. While the majority of those securities are backed by prime, fixed rate, 30 year mortgages, price declines coupled with increased economic pressure have impacted all sectors of the housing market which has impacted credit ratings of securities backed by loans issued within the last couple of years.

In the first quarter of 2009, rating agencies downgraded three securities with a combined face value of $42 million as of March 31, 2009. The first bond, backed by prime, fixed rate, 30 year mortgages, was downgraded to CC from BBB by one rating agency and to CCC from BB by another rating agency. The second bond, backed by Alt-A, fixed rate, 30 year mortgages, was downgraded to CCC from AAA by one rating agency while another rating agency maintained a BB rating. The third bond, backed by Alt-A, fixed rate, 30 year mortgages, was downgraded to BB from AAA by one rating agency while another rating agency maintained an A rating. From April 1 to 24, 2009, various rating agencies issued ratings downgrades on several securities—nine bonds with a combined face value of $88 million were downgraded (downgrades to AA, BBB, BB, Ba3, B1, B3 and CCC). While risks related to private-issue mortgage-related securities have increased, ASB believes that, based on its internal assessment of positions held in the portfolio and its ability and intent to hold these securities until a recovery of fair value, which may be at maturity, it does not consider these securities to be other-than-temporarily impaired at March 31, 2009. ASB will continue to analyze and monitor these securities.

Should market conditions and the performance of mortgage-related assets continue to deteriorate, ASB could incur a material other-than-temporary impairment on additional securities.

Interest rate risk is a significant risk of ASB’s operations and also represents a market risk factor affecting the fair value of ASB’s investment securities. Increases and decreases in prevailing interest rates generally translate into decreases and increases in fair value of those instruments. In addition, changes in credit spreads also impact the fair values of those instruments. Continued deterioration in the housing market has amplified the credit risks in ASB’s RMBS holdings. Although most of the bonds are senior securities which were underwritten to be the shortest duration instruments in the deal structure, further deterioration in the housing market may negatively impact the outstanding credit enhancement of these positions. Continued deterioration in pools supporting ASB’s securities will adversely impact their value. While current AOCI deficits are considered temporary, greater declines in the housing market may negatively impact their valuation and result in “other-than-temporary” losses that are material.

Although higher long-term interest rates or other conditions in credit markets (such as the effects of the deteriorated subprime market) could reduce the market value of available-for-sale investment and mortgage-related securities and reduce stockholder’s equity through a balance sheet charge to AOCI, this reduction in the market value of investments and mortgage-related securities would not result in a charge to net income in the absence of a sale of such securities (such as those that occurred in the balance sheet restructure) or an “other-than-temporary” impairment in the value of the securities. As of March 31, 2009 and December 31, 2008, the unrealized losses, net of tax benefits, on available-for-sale investments and mortgage-related securities (including securities pledged for repurchase agreements) in AOCI was $24 million and $33 million, respectively. See “Quantitative and qualitative disclosures about market risk.”

Average balance sheet and net interest margin. The following tables set forth average balances, together with interest and dividend income earned and accrued, and resulting yields and costs for the three months ended March 31, 2009 and 2008.

*($ in thousands)*

| Assets: | Three months ended March 31 2009 Average Balance | Interest | Average Rate (%) | 2008 Average Balance | Interest | Average Rate (%) |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Other investments 1 | $107,118 | $— | — | $137,319 | $561 | 1.62 |
| Investment and mortgage-related securities | 675,927 | 7,676 | 4.54 | 2,142,126 | 23,890 | 4.46 |
| Loans receivable 2 | 4,177,039 | 58,092 | 5.58 | 4,166,005 | 63,465 | 6.10 |
| Total interest-earning assets | 4,960,084 | 65,768 | 5.32 | 6,445,450 | 87,916 | 5.46 |
| Allowance for loan losses | (36,265) |  |  | (30,035) |  |  |
| Non-interest-earning assets | 359,244 |  |  | 428,467 |  |  |
| Total assets | $5,283,063 |  |  | $6,843,882 |  |  |
| Liabilities and Stockholder’s Equity: |  |  |  |  |  |  |
| Interest-bearing demand and savings deposits | $2,119,976 | 2,347 | 0.45 | $2,097,608 | 3,507 | 0.67 |
| Time certificates | 1,326,957 | 9,218 | 2.82 | 1,577,733 | 14,713 | 3.74 |
| Total interest-bearing deposits | 3,446,933 | 11,565 | 1.36 | 3,675,341 | 18,220 | 1.99 |
| Other borrowings | 561,166 | 3,264 | 2.33 | 1,805,994 | 19,149 | 4.25 |
| Total interest-bearing liabilities | 4,008,099 | 14,829 | 1.50 | 5,481,335 | 37,369 | 2.73 |
| Non-interest bearing liabilities: |  |  |  |  |  |  |
| Deposits | 714,499 |  |  | 655,146 |  |  |
| Other | 85,360 |  |  | 107,938 |  |  |
| Stockholder’s equity | 475,105 |  |  | 599,463 |  |  |
| Total Liabilities and Stockholder’s Equity | $5,283,063 |  |  | $6,843,882 |  |  |
| Net interest income |  | $50,939 |  |  | $50,547 |  |
| Net interest margin (%) 3 |  |  | 4.11 |  |  | 3.13 |

1 Includes federal funds sold, interest bearing deposits and stock in the FHLB of Seattle ($98 million as of March 31, 2009).

2 Includes loan fees of $1.9 million and $1.1 million for the three months ended March 31, 2009 and 2008, respectively, together with interest accrued prior to suspension of interest accrual on nonaccrual loans. Includes nonaccrual loans.

3 Defined as net interest income as a percentage of average earning assets.

***Results – three months ended March 31, 2009***. Net interest income before provision for loan losses for the three months ended March 31, 2009 increased by $0.4 million, or 1%, when compared to the same period in 2008 as lower funding costs and higher balances on loans were partially offset by lower yields on loans and lower balances of investment and mortgage-related securities. Net interest margin increased from 3.13% in the first quarter of 2008 to 4.11% in the first quarter of 2009 due to the restructuring of the balance sheet, which removed lower spread net assets (investment and mortgage-related securities and other borrowings). The increase in the average loan portfolio balance was due, in part, to growth in the home equity lines of credit and continued growth in the commercial markets loan portfolio. The decrease in average residential loan balances was due to lower demand for residential loans in 2008 and ASB’s strategic decision to sell all salable residential loan production in the current low interest rate environment. The decrease in the average investment and mortgage-related securities portfolios was primarily due to the sale of securities in the balance sheet restructure. See “Balance sheet restructure” in Note 4 to HEI’s “Notes to Consolidated Financial Statements.” Average deposit balances decreased by $169 million compared to the first quarter of 2008, and decreased by $32 million compared to the last quarter of 2008. ASB experienced outflows throughout 2008 as the downward trend in interest rates made it difficult to retain deposits. The shift in deposit mix from higher cost certificates to lower cost savings and checking accounts, along with the repricing of deposits as a result of a downward movement in the general level of interest rates, has contributed to decreased funding costs. Average other borrowings decreased by $1.2 billion primarily due to the early extinguishment of other borrowings in the balance sheet restructure.

During the first quarter of 2009, ASB recorded a provision for losses of $8.3 million due to an increase in nonperforming residential lot loans and residential mortgages and the reclassification of one commercial loan. Higher levels of delinquencies and loan loss provisions are expected through the economic downturn. During the first quarter of 2008, ASB recorded a provision for losses of $0.9 million due to loan growth as well as an increase in the classification of commercial loans.

*(in thousands)*

|  | Three months ended March 31 2009 | 2008 | Year ended December 31 2008 |
| --- | ---: | ---: | ---: |
| Allowance for loan losses, January 1 | $35,798 | $30,211 | $30,211 |
| Provision for loan losses | 8,300 | 900 | 10,334 |
| Less: net charge-offs | 2,047 | 483 | 4,747 |
| Allowance for loan losses, end of period | $42,051 | $30,628 | $35,798 |
| Ratio of allowance for loan losses, end of period, to average loans outstanding | 1.01% | 0.74% | 0.86% |
| Ratio of net charge-offs during the period to average loans outstanding | 0.20% | 0.05% | 0.11% |
| Nonaccrual loans | 54,627 | 7,451 | 19,494 |

First quarter of 2009 noninterest income decreased by $1.7 million, or 9%, when compared to the first quarter of 2008, primarily due to a gain on sale of stock in a membership organization in 2008.

Noninterest expense for the first quarter of 2009 decreased by $2.4 million, or 5%, when compared to the first quarter of 2008, primarily due to lower legal and consulting expenses, partially offset by higher compensation and employee benefits expenses.

***Legislation and regulation.*** ASB is subject to extensive regulation, principally by the Office of Thrift Supervision (OTS) and the Federal Deposit Insurance Corporation (FDIC). Depending on its level of regulatory capital and other considerations, these regulations could restrict the ability of ASB to compete with other institutions and to pay dividends to its shareholders. See the discussion below under “Liquidity and capital resources.” Also see “FDIC restoration plan” and “Deposit insurance coverage” in Note 4 of HEI’s “Notes to Consolidated Financial Statements.”

***FHLB of Seattle dividends.*** In December 2008, the FHLB of Seattle announced that it would not pay a dividend on its stock in the fourth quarter of 2008 due to a net loss reported by the FHLB of Seattle for the third quarter of 2008. The FHLB of Seattle also announced that it had a risk-based capital deficiency at December 31, 2008 and would not be able to repurchase capital stock or declare a dividend while a risk-based capital deficiency exists. ASB does not believe that the FHLB of Seattle’s risk-based capital deficiency will affect the FHLB of Seattle’s ability to meet ASB’s liquidity and funding needs. ASB received cash dividends on its $98 million of FHLB of Seattle stock of $0.1 million in 2006, $0.6 million in 2007 and $0.9 million in 2008. Periodically and as conditions warrant, ASB reviews its investment in the stock of FHLB of Seattle for impairment and adjusts the carrying value if the investment is determined to be impaired.

***Commitments and contingencies***. See Note 4 of HEI’s “Notes to Consolidated Financial Statements.”

***Recent accounting pronouncements and interpretations***. See Note 9 of HEI’s “Notes to Consolidated Financial Statements.”

### FINANCIAL CONDITION

### Liquidity and capital resources

*(in millions)*

|  | March 31, 2009 | December 31, 2008 | % change |
| --- | ---: | ---: | ---: |
| Total assets | $5,160 | $5,437 | (5) |
| Available-for-sale investment and mortgage-related securities | 600 | 658 | (9) |
| Investment in stock of FHLB of Seattle | 98 | 98 | — |
| Loans receivable, net | 4,015 | 4,206 | (5) |
| Deposit liabilities | 4,154 | 4,180 | (1) |
| Other bank borrowings | 436 | 681 | (36) |

As of March 31, 2009, ASB was one of Hawaii’s largest financial institutions based on assets of $5.2 billion and deposits of $4.2 billion.

In March 2007, Moody’s raised ASB’s counterparty credit rating to A3 from Baa3 and, in March 2009, changed the outlook to “negative” from “stable.” In April 2007, S&P raised ASB’s long-term/short-term counterparty credit ratings to BBB/A-2 from BBB-/A-3 and in May 2008 maintained the rating following its annual review of ASB. These ratings reflect only the view, at the time the ratings are issued, of the applicable rating agency, from whom an explanation of the significance of such ratings may be obtained. Such ratings are not recommendations to buy, sell or hold any securities; such ratings may be subject to revision or withdrawal at any time by the rating agencies; and each rating should be evaluated independently of any other rating.

As of March 31, 2009, ASB’s unused FHLB borrowing capacity was approximately $1.7 billion. As of March 31, 2009, ASB had commitments to borrowers for undisbursed loan funds, loan commitments and unused lines and letters of credit of $1.3 billion. Management believes ASB’s current sources of funds will enable it to meet these obligations while maintaining liquidity at satisfactory levels.

As of March 31, 2009 and December 31, 2008, ASB had $2.7 million and $1.5 million, respectively, of real estate acquired in settlement of loans.

For the first quarter of 2009, net cash provided by ASB’s operating activities was $35 million. Net cash provided during the same period by ASB’s investing activities was $235 million, primarily due to a net decrease in loans receivable of $164 million and repayments of investment and mortgage-related securities of $181 million, partly offset by purchases of investment and mortgage-related securities of $109 million. Net cash used in financing activities during this period was $287 million, primarily due to net decreases in Federal Home Loan Bank advances, deposit liabilities, securities sold under agreements to repurchase, escrow deposits and retail repurchase agreements of $238 million, $26 million, $5 million, $5 million and $2 million, respectively, and the payment of $11 million in common stock dividends.

ASB believes that a satisfactory regulatory capital position provides a basis for public confidence, affords protection to depositors, helps to ensure continued access to capital markets on favorable terms and provides a foundation for growth. FDIC regulations restrict the ability of financial institutions that are not well-capitalized to compete on the same terms as well-capitalized institutions, such as by offering interest rates on deposits that are significantly higher than the rates offered by competing institutions. As of March 31, 2009, ASB was well-capitalized (minimum ratio requirements noted in parentheses) with a leverage ratio of 9.0% (5.0%), a Tier-1 risk-based capital ratio of 12.0% (6.0%) and a total risk-based capital ratio of 13.1% (10.0%). The OTS has approved ASB’s payment of quarterly dividends through the quarter ended June 30, 2009 to the extent that payment of the dividend would not cause ASB’s Tier I leverage ratio to fall below 8% as of the end of the quarter.

## Market risk

As filed, 5,361 characters.

Credit risk for ASB is the risk that borrowers or issuers of securities will not be able to repay their obligations to the bank. Credit risk associated with ASB’s lending portfolios is controlled through its underwriting standards, loan rating of commercial and commercial real estate loans, on-going monitoring by loan officers, credit review and quality control functions in these lending areas and adequate allowance for loan losses. Credit risk associated with the securities portfolio is mitigated through investment portfolio limits, experienced staff working with analytical tools, monthly fair value analysis and on-going monitoring and reporting such as investment watch reports and loss sensitivity analysis. Credit risk for ASB has risen as a result of the pronounced slowdown in the national and Hawaii economies. In Hawaii, the unemployment rate has increased, residential loan delinquencies have trended upward and bankruptcy filings have increased, resulting in the increased provision for loan losses in 2008 and the first quarter of 2009. Further, the value of mortgage-related securities became impaired resulting in the write-down of two securities in December 2008. See “Net interest margin and other factors” and “Results—three months ended March 31, 2009” above.

The Company considers interest-rate risk (a non-trading market risk) to be a very significant market risk for ASB as it could potentially have a significant effect on the Company’s financial condition and results of operations. For additional quantitative and qualitative information about the Company’s market risks, see pages 59 to 62, HEI’s Quantitative and qualitative disclosures about market risk, which is incorporated into Part II, Item 7A of HEI’s 2008 Form 10-K by reference to HEI Exhibit 13 to HEI’s Current Report on Form 8-K dated February 19, 2009.

ASB’s interest-rate risk sensitivity measures as of March 31, 2009 and December 31, 2008 constitute “forward-looking statements” and were as follows:

| Change in interest rates (basis points) | March 31, 2009 Change in NII Gradual change | NPV ratio Instantaneous change |  | NPV ratio sensitivity \* | December 31, 2008 Change in NII Gradual change | NPV ratio Instantaneous change | NPV ratio sensitivity \* |
| --- | ---: | ---: | --- | ---: | ---: | ---: | ---: |
| +300 | (1.6) | 8.67 |  | (313) | 1.2% | 6.94% | (379) |
| +200 | (0.7) | 9.97 |  | (183) | 1.2 | 8.42 | (231) |
| +100 | (0.2) | 11.12 |  | (68) | 0.7 | 9.84 | (89) |
| Base | — | 11.80 |  |  | — | 10.73 | — |
| -100 | (1.2) | 11.47 |  | (33) | (1.6) | 10.43 | (30) |
| -200 | \* \* | \* | \* | \* \* | \* \* | \* \* | \* \* |
| -300 | \* \* | \* | \* | \* \* | \* \* | \* \* | \* \* |

\* Change from base case in basis points (bp).

\*\* For March 31, 2009 and December 31, 2008, the -200 and -300 bp scenarios were not performed because they would have resulted in negative Treasury interest rates.

ASB’s net interest income (NII) sensitivity shifted from asset to liability sensitive in the rising rate scenarios from December 31, 2008 to March 31, 2009 primarily due to the decrease in size and change in mix of the balance sheet and changes in assumptions about sensitivity to changes in rates.

ASB’s base net present value (NPV) ratio as of March 31, 2009 increased compared to December 31, 2008 primarily due to the decrease in size of the balance sheet, change in mix of the balance sheet and changes in market valuations.

ASB’s NPV ratio sensitivity measure as of March 31, 2009 is less sensitive in rising rate scenarios when compared to December 31, 2008 primarily due to changes in balance sheet mix.

The computation of the prospective effects of hypothetical interest rate changes on the NII sensitivity, NPV ratio, and NPV ratio sensitivity analyses is based on numerous assumptions, including relative levels of market interest rates, loan prepayments, balance changes and pricing strategies, and should not be relied upon as indicative of actual results (see page 60 of HEI Exhibit 13 to HEI’s Current Report on Form 8-K dated February 19, 2009 for a more detailed description of key modeling assumptions used in the NII sensitivity analysis). To the extent market conditions and other factors vary from the assumptions used in the simulation analysis, actual results may differ materially from the simulation results. Furthermore, NII sensitivity analysis measures the change in ASB’s twelve-month, pre-tax NII in alternate interest rate scenarios, and is intended to help management identify potential exposures in ASB’s current balance sheet and formulate appropriate strategies for managing interest rate risk. The simulation does not contemplate any actions that ASB management might undertake in response to changes in interest rates. Further, the changes in NII vary in the twelve-month simulation period and are not necessarily evenly distributed over the period. These analyses are for analytical purposes only and do not represent management’s views of future market movements, the level of future earnings, or the timing of any changes in earnings within the twelve month analysis horizon. The actual impact of changes in interest rates on NII will depend on the magnitude and speed with which rates change, actual changes in ASB’s balance sheet, and management’s responses to the changes in interest rates.

## Controls and procedures

As filed, 2,953 characters.

### HEI:

### Changes in Internal Control over Financial Reporting

During the first quarter of 2009, there was no change in internal control over financial reporting identified in connection with management’s evaluation of the effectiveness of the Company’s internal control over financial reporting as of March 31, 2009 that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting.

### Conclusion Regarding the Effectiveness of Disclosure Controls and Procedures

Constance H. Lau, HEI Chief Executive Officer, and James A. Ajello, HEI Chief Financial Officer, have evaluated the disclosure controls and procedures of HEI as of March 31, 2009. Based on their evaluations, as of March 31, 2009, they have concluded that the disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) were effective in ensuring that information required to be disclosed by HEI in reports HEI files or submits under the Securities Exchange Act of 1934:

(1) is recorded, processed, summarized, and reported within the time periods specified in the Securities and Exchange Commission rules and forms, and

(2) is accumulated and communicated to HEI management, including HEI’s principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

### HECO:

### Changes in Internal Control over Financial Reporting

During the first quarter of 2009, there was no change in internal control over financial reporting identified in connection with management’s evaluation of the effectiveness of HECO and its subsidiaries’ internal control over financial reporting as of March 31, 2009 that has materially affected, or is reasonably likely to materially affect, HECO and its subsidiaries’ internal control over financial reporting.

### Conclusion Regarding the Effectiveness of Disclosure Controls and Procedures

Richard M. Rosenblum, HECO Chief Executive Officer, and Tayne S. Y. Sekimura, HECO Chief Financial Officer, have evaluated the disclosure controls and procedures of HECO as of March 31, 2009. Based on their evaluations, as of March 31, 2009, they have concluded that the disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) were effective in ensuring that information required to be disclosed by HECO in reports HECO files or submits under the Securities Exchange Act of 1934:

(1) is recorded, processed, summarized, and reported within the time periods specified in the Securities and Exchange Commission rules and forms, and

(2) is accumulated and communicated to HECO management, including HECO’s principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

## Risk factors

As filed, 446 characters.

For information about Risk Factors, see pages 31 to 41 of HEI’s 2008 Form 10-K, and “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” “Quantitative and Qualitative Disclosures about Market Risk,” HEI’s Consolidated Financial Statements and HECO’s Consolidated Financial Statements herein. Also, see “Forward-Looking Statements” on pages v and vi of HEI’s 2008 Form 10-K, as updated on pages iv and v herein.

Filed May 5, 2009.