# Boeing Co: Form 10-Q for the period ended Jun 30, 2009

- Company: [Boeing Co](/companies/ba.md) (CIK 12927)
- Form: 10-Q
- Filed: 2009-07-22
- Accepted by EDGAR: Jul 22, 2009, 12:32 ET
- Period: 2009-06-30
- Accession: 0001193125-09-152905
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/12927/000119312509152905/d10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/12927/000119312509152905/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2009-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2009-04-01 to 2009-06-30 | $17.15bn | us-gaap:Revenues |
| Revenue | 6 months, 2009-01-01 to 2009-06-30 | $33.66bn | us-gaap:Revenues |
| Cost of revenue | 3 months, 2009-04-01 to 2009-06-30 | $13.81bn | us-gaap:CostOfRevenue |
| Cost of revenue | 6 months, 2009-01-01 to 2009-06-30 | $27.55bn | us-gaap:CostOfRevenue |
| Gross profit | 3 months, 2009-04-01 to 2009-06-30 | $3.35bn | us-gaap:GrossProfit |
| Gross profit | 6 months, 2009-01-01 to 2009-06-30 | $6.10bn | us-gaap:GrossProfit |
| Research and development | 3 months, 2009-04-01 to 2009-06-30 | $960.0m | us-gaap:ResearchAndDevelopmentExpense |
| Research and development | 6 months, 2009-01-01 to 2009-06-30 | $1.93bn | us-gaap:ResearchAndDevelopmentExpense |
| Operating income | 3 months, 2009-04-01 to 2009-06-30 | $1.53bn | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2009-01-01 to 2009-06-30 | $2.55bn | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2009-04-01 to 2009-06-30 | $499.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2009-01-01 to 2009-06-30 | $816.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2009-04-01 to 2009-06-30 | $998.0m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2009-01-01 to 2009-06-30 | $1.61bn | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2009-04-01 to 2009-06-30 | $1.41 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2009-01-01 to 2009-06-30 | $2.27 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2009-04-01 to 2009-06-30 | $1.42 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2009-01-01 to 2009-06-30 | $2.28 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2009-04-01 to 2009-06-30 | 707,400,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2009-01-01 to 2009-06-30 | 707,800,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2009-01-01 to 2009-06-30 | $1.19bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months, 2009-01-01 to 2009-06-30 | $736.0m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 6 months, 2009-01-01 to 2009-06-30 | $610.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Share repurchases | 6 months, 2009-01-01 to 2009-06-30 | $50.0m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2009-06-30 | $4.60bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2009-06-30 | $30.12bn | us-gaap:AssetsCurrent |
| Total assets | at 2009-06-30 | $57.71bn | us-gaap:Assets |
| Current liabilities | at 2009-06-30 | $31.27bn | us-gaap:LiabilitiesCurrent |
| Current portion of debt | at 2009-06-30 | $416.0m | us-gaap:DebtCurrent |
| Shareholders' equity | at 2009-06-30 | $180.0m | us-gaap:StockholdersEquity |
| Shares outstanding | at 2009-06-30 | 726,432,299 shares | dei:EntityCommonStockSharesOutstanding |

## Management's discussion and analysis

As filed, 56,678 characters.

### Consolidated Operating Results

The following table summarizes key indicators of consolidated results of operations:

*(Dollars in millions, except per share data)*

|  | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$33,656** | $32,952 | **$17,154** | $16,962 |
| Earnings from operations | **$2,554** | $3,046 | **$1,529** | $1,247 |
| Operating margins | **7.6%** | 9.2% | **8.9%** | 7.4% |
| Effective income tax rate | **33.6%** | 34.7% | **33.4%** | 34.5% |
| Net earnings from continuing operations | **$1,612** | $2,057 | **$997** | $851 |
| Diluted earnings per share | **$2.27** | $2.79 | **$1.41** | $1.16 |

*(Dollars in millions)*

|  | June 30 2009 | December 31 2008 |
| --- | ---: | ---: |
| Contractual backlog | **$305,272** | $323,860 |
| Unobligated backlog | **22,486** | 28,165 |

### Revenues

The following table summarizes revenues:

*(Dollars in millions)*

|  | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Commercial Airplanes | **$16,985** | $16,728 | **$8,431** | $8,567 |
| Integrated Defense Systems | **16,370** | 15,509 | **8,650** | 7,934 |
| Boeing Capital Corporation | **330** | 364 | **167** | 179 |
| Other | **74** | 227 | **35** | 152 |
| Unallocated items and eliminations | **(103)** | 124 | **(129)** | 130 |
| Revenues | **$33,656** | $32,952 | **$17,154** | $16,962 |

Revenues for the six and three months ended June 30, 2009 increased by $704 million and $192 million, a 2% and 1% increase compared with the same periods in 2008. Commercial Airplanes revenues increased by $257 million for the six month period and decreased by $136 million for the three month period reflecting higher new airplane revenues and decreases in commercial aviation services revenues. Integrated Defense Systems (IDS) revenues increased by $861 million and $716 million primarily due to higher revenues in the Network & Space Systems (N&SS) segment and the Global Services and Support (GS&S) segment. Boeing Capital Corporation (BCC) revenues decreased by $34 million during the six months due to a decrease in the customer financing portfolio. Other segment revenues decreased by $153 million and $117 million partly due to higher revenues in the prior year from the sale of a C-17 aircraft held under operating lease. Unallocated items and eliminations revenues decreased by $227 million and $259 million partly due to lower revenues in the P-8A Poseidon program (P-8A) compared with the same periods in the prior year.

### Earnings from Operations

The following table summarizes earnings from operations:

*(Dollars in millions)*

|  | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Commercial Airplanes | **$1,234** | $1,760 | **$817** | $777 |
| Integrated Defense Systems | **1,585** | 1,497 | **876** | 637 |
| Boeing Capital Corporation | **73** | 106 | **36** | 45 |
| Other | **(69)** | (185) | **(46)** | (135) |
| Unallocated items and eliminations | **(269)** | (132) | **(154)** | (77) |
| Earnings from operations | **$2,554** | $3,046 | **$1,529** | $1,247 |

Operating earnings for the six and three months ended June 30, 2009 decreased by $492 million and increased by $282 million compared with the same periods in 2008. Commercial Airplanes earnings decreased by $526 million and increased by $40 million compared with the same periods in 2008. The decrease for the six months is attributable to a reach forward loss on the 747 program which grew by $347 million and reduced margins on other programs. IDS earnings increased by $88 million and $239 million compared with the same periods in 2008 largely due to higher earnings in the Boeing Military Aircraft (BMA) segment resulting from a charge of $248 million taken on the Airborne Early Warning & Control (AEW&C) program in the second quarter of 2008. BCC operating earnings decreased $33 million and $9 million compared with the same periods in 2008 reflecting lower revenues, higher impairment expense and a provision for losses, partially offset by lower interest expense. Other segment losses decreased by $116 million and $89 million compared with the same periods in 2008 primarily due to an increase in the allowance for losses on customer financing receivables related to lower U.S. airline customer credit ratings in the three months ended June 30, 2008.

The most significant expense items not allocated to segments are shown in the table below.

*(Dollars in millions)*

|  | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Pension | **$45** | $(143) | **$22** | $(76) |
| Postretirement | **(44)** | (40) | **(21)** | (20) |
| Share-based plans | **(116)** | (45) | **(59)** | (15) |
| Deferred compensation | **(46)** | 81 | **(69)** | 20 |
| Other unallocated items and eliminations | **(108)** | 15 | **(27)** | 14 |
| Total | **$(269)** | $(132) | **$(154)** | $(77) |

Share-based plans expense in Unallocated items and eliminations is higher in the current year resulting from a decrease in the amount of intercompany allocations compared with the same periods in the prior year. The year over year changes in deferred compensation expense are primarily driven by changes in our stock price and broad stock market conditions.

Other unallocated items and eliminations expense for the six and three months ended June 30, 2009 increased by $123 million and $41 million compared with the same periods in 2008, primarily due to timing of intercompany expense allocations and elimination of profit on intercompany items.

Unallocated pension and other postretirement expense represents the difference between costs recognized under Generally Accepted Accounting Principles in the consolidated financial statements and federal cost accounting standards required to be utilized by our business segments for U.S. government contracting purposes.

We recorded net periodic benefit cost related to pensions and other postretirement benefits of $904 million and $450 million for the six and three months ended June 30, 2009 and $566 million and $283 million for the six and three months ended June 30, 2008. The increase was primarily due to higher amortization of pension actuarial losses. Not all net periodic benefit cost is recognized in earnings in the period incurred because it is allocated to production as product costs and a portion remains in inventory at the end of the reporting period. A portion of pension and other postretirement expense is recorded in the business segments and the remainder is included in unallocated pension and other postretirement expense.

Earnings from operations included the following amounts allocated to business segments and Other unallocated items and eliminations.

*(Dollars in millions)*

| Pension Plans | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Net periodic benefit cost allocated to business segments | **$(471)** | $(264) | **$(229)** | $(140) |
| Net periodic benefit cost in Other unallocated items and eliminations | **45** | (143) | **22** | (76) |
| Net periodic benefit cost included in Earnings from operations | **$(426)** | $(407) | **$(207)** | $(216) |

*(Dollars in millions)*

| Other Postretirement Benefit Plans | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Net periodic benefit cost allocated to business segments | **$(258)** | $(246) | **$(124)** | $(129) |
| Net periodic benefit cost in Other unallocated items and eliminations | **(44)** | (40) | **(21)** | (20) |
| Net periodic benefit cost included in Earnings from operations | **$(302)** | $(286) | **$(145)** | $(149) |

### Other Earnings Items

*(Dollars in millions)*

|  | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| **Earnings from operations** | **$2,554** | $3,046 | **$1,529** | $1,247 |
| Other income, net | **11** | 202 | **47** | 102 |
| Interest and debt expense | **(137)** | (96) | **(80)** | (50) |
| **Earnings before income taxes** | **2,428** | 3,152 | **1,496** | 1,299 |
| Income tax expense | **(816)** | (1,095) | **(499)** | (448) |
| **Net earnings from continuing operations** | **$1,612** | $2,057 | **$997** | $851 |

30

Other income for the six and three months ended June 30, 2009 decreased $191 million and $55 million compared with the same periods in 2008 primarily driven by a reduction in investment income as a result of lower interest rates and lower investment balances.

For a discussion related to Income Taxes see Note 3.

### Backlog

Contractual backlog of unfilled orders excludes purchase options, announced orders for which definitive contracts have not been executed and unobligated U.S. and non-U.S. government contract funding. The decrease in contractual backlog during the six months ended June 30, 2009 was primarily due to lower Commercial Airplanes backlog.

Unobligated backlog includes U.S. and foreign government definitive contracts for which funding has not been authorized. The decrease in unobligated backlog during the six months ended June 30, 2009 is primarily due to funding of existing multi-year contracts including the V-22, Future Combat Systems (FCS), Chinook and Ground-Based Midcourse Defense (GMD) programs.

### Segment Results of Operations

### Commercial Airplanes

### Business Environment and Trends

After several months of rapid deterioration, world Gross Domestic Product (GDP) growth forecasts appear to be stabilizing. These forecasts continue to project a slow global economic recovery with world real GDP contracting by over 2% in 2009 and remaining well below long-term trend growth in 2010.

The sharp economic decline is causing passenger traffic to contract. The International Civil Aviation Organization estimates passenger traffic grew 1% in 2008 with first half growth running fairly close to long-term trend. This was followed by a significant decline in the second half of 2008. There is further downward pressure on 2009 traffic growth. Current forecasts for 2009 global passenger traffic growth are for mid-single digit contraction similar to previous downturns (-3% in 2001 and 1991) followed by moderate growth in 2010.

The unprecedented decline in world trade and sharp reduction in credit availability have hit air cargo even more deeply with cargo traffic declining 27% in first quarter 2009 compared to first quarter 2008. Air cargo traffic is forecasted to contract for the second straight year in 2009 taking air cargo traffic back to 2003 levels.

Airline losses were larger than expected in first quarter 2009 as air travel demand declined more rapidly than previously forecasted. As a result of the weaker revenue environment, the International Air Transport Association increased its 2009 airline industry loss forecast to $9.0 billion from the $4.7 billion estimated in March 2009. In addition, the net loss for 2008 was increased from $8.5 billion estimated in March to $10.4 billion. Sharply lower fuel prices in 2009 are forecast to cut airline fuel expenses by $59 billion compared with 2008. However, the decline is not enough to fully offset revenue declines. All regions of the world are now forecasted to incur losses, led by Asia-Pacific and Europe.

In this challenging environment, airlines continue to adapt their operations to meet the realities of the market. Global passenger capacity is down about 3% in the first half of 2009 with further cuts expected in the second half of the year. Capacity cuts are coming through a combination of frequency and route cuts in markets that are no longer profitable, lower daily airplane utilization (flight hours per day), and parking/scrapping of older generation airplanes. Airlines are also replacing older less fuel efficient airplanes, reducing non-fuel costs and finding new ways to partner through alliances or via mergers/acquisitions.

These conditions are causing customers to request cancellations, modifications, or rescheduling of their existing orders and advance payment schedules to meet revised fleet plans or address financing and cash flow issues. Whether such requests will result in a material adverse impact on our earnings, cash flow or financial position depends on a number of factors including whether the request is granted, the type of aircraft, how much compensation is paid to us for costs already incurred and our ability to reschedule other orders to replace those canceled, modified, or rescheduled.

Beyond the near-term market uncertainties, the long-term outlook for the industry remains resilient due to the fundamental drivers of air travel growth: economic growth and the increasing propensity to travel due to increased trade, globalization and improved airline services driven by liberalization of air traffic rights between countries. Our 20-year forecast is for a long-term average growth rate of 5% per year for passenger and cargo traffic based on projected average annual worldwide real economic growth rate of 3%. Based on long-term global economic growth projections, and factoring in increased utilization of the worldwide airplane fleet and requirements to replace older airplanes, we project a $3.2 trillion market for 29,000 new airplanes over the next 20 years.

In April 2009, we announced a plan to reduce production rates on the 777 program and to delay planned increases to the production rates of the 747 and 767 programs in response to requests from customers. These changes are not expected to affect 2009 revenues but did reduce margins on airplane programs. Separately, changes in escalation price indices during the six months ended June 30, 2009 also reduced margins on all programs. The reduction in escalation indices had the effect of lowering estimated revenues for deliveries after 2009. The escalation indices are driven by commodity and other inflation price indices and could remain volatile in the current economic environment.

### Operating Results

*(Dollars in millions)*

|  | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$16,985** | $16,728 | **$8,431** | $8,567 |
| Earnings from operations | **$1,234** | $1,760 | **$817** | $777 |
| Operating margins | **7.3%** | 10.5% | **9.7%** | 9.1% |

*(Dollars in millions)*

|  | June 30 2009 | December 31 2008 |
| --- | ---: | ---: |
| Contractual backlog | **$257,443** | $278,575 |

32

### Revenues

Year over year changes in Revenue are shown in the following table:

*(Dollars in millions)*

|  | Six months ended June 30, 2009 vs. June 30, 2008 | Three months ended June 30, 2009 vs. June 30, 2008 |
| --- | ---: | ---: |
| New airplane sales | $649 | $47 |
| Commercial aviation services business | (350) | (147) |
| Other | (42) | (36) |
| Total | $257 | $(136) |

Revenues for the six months ended June 30, 2009 increased by $257 million compared with the same period of 2008. This increase in revenue was primarily attributable to higher new airplane deliveries. The decrease in revenues from commercial aviation services business was driven by lower spares volume and fewer passenger to freighter conversions.

Revenues for the three months ended June 30, 2009 decreased by $136 million compared with the same period of 2008. The decrease in revenues was primarily driven by lower spares volume from commercial aviation services business.

Commercial jet aircraft deliveries, including intercompany deliveries were as follows:

|  |  |  |  |  |  |
| --- | ---: | ---: | ---: | ---: | ---: |
| **Program** | **737** | **747** | **767** | **777** | **Total** |
| Deliveries during the first six months of 2009 | 190 | 6 | 6 | 44 | 246 |
| Deliveries during the first six months of 2008 | 187 | 9 | 6 | 39 | 241 |
| Deliveries during the second quarter of 2009 | 99 | 2 | 3 | 21 | 125 |
| Deliveries during the second quarter of 2008 | 100 | 5 | 3 | 18 | 126 |
| Cumulative deliveries as of 6/30/2009 | 2,946 | 1,416 | 975 | 792 |  |
| Cumulative deliveries as of 12/31/2008 | 2,756 | 1,410 | 969 | 748 |  |

### Earnings from Operations

Earnings from operations for the six months ended June 30, 2009 decreased by $526 million and operating margins decreased by 3.2 percentage points to 7.3% compared with the same period of 2008. The reach forward loss on the 747 program grew by $347 million and margins were reduced on other programs, both primarily due to lower projected delivery pricing associated with the lower industry escalation indices and lower planned future production rates on the 747, 767 and 777 programs, somewhat offset by refined cost estimates. The escalation and production rate impact, together with warranty and other expenses reduced earnings on other programs by $142 million. Higher infrastructure cost allocations related to the 787 and 747-8 schedule delays announced in 2008 and infrastructure costs incurred during the 2008 IAM strike reduced earnings by $145 million. Lower commercial aviation services volume reduced earnings by $168 million. These decreases were partially offset by increased earnings of $243 million from new airplane deliveries and $33 million from lower research and development costs.

Earnings from operations for the three months ended June 30, 2009 increased by $40 million and operating margins increased by 0.6 percentage points to 9.7% compared with the same period of 2008. The increase in earnings was primarily due to higher airplane revenues of $65 million and lower research and development expense of $112 million. Lower commercial aviation services volume reduced earnings by $100 million. Lower projected delivery pricing associated with the lower industry escalation indices and lower planned future production rates on the 747, 767 and 777 programs, together with warranty and other expenses, reduced earnings $7 million. Higher infrastructure cost allocations related to the 787 and 747-8 schedule delays announced in 2008 and infrastructure costs incurred during the 2008 IAM strike reduced earnings by $30 million.

### Backlog

The decrease in contractual backlog during the six months ended June 30, 2009 compared with December 31, 2008 was due to deliveries in excess of orders, changes in projected revenue escalation and cancellations of 787 orders.

A number of our customers may have contractual remedies that may be implicated by program delays. We continue to address customer claims and requests for other contractual relief as they arise. However, once orders are included in firm backlog, orders remain in backlog until canceled or fulfilled, although the value of orders is adjusted based upon changing revenue escalation assumptions and as changes to price and schedule are agreed to with customers.

### Accounting Quantity

The accounting quantities, undelivered units under firm orders and number of cumulative firm orders were as follows:

|  | Program |  |  |  |  |
| --- | ---: | ---: | ---: | ---: | ---: |
| **As of 6/30/2009** | **737** | **747** | **767** | **777** | **787** |
| Program accounting quantities | **4,400** | **1,499** | **1,023** | **1,050** | **\*** |
| Undelivered units under firm orders1 | **2,137** | **107** | **61** | **314** | **850** |
| Cumulative firm orders2 | **5,083** | **1,523** | **1,036** | **1,106** |  |
|  | Program |  |  |  |  |
| As of 3/31/2009 | 737 | 747 | 767 | 777 | 787 |
| Program accounting quantities | 4,200 | 1,499 | 1,023 | 1,050 | \* |
| Undelivered units under firm orders1 | 2,203 | 110 | 67 | 331 | 878 |
| Cumulative firm orders2 | 5,050 | 1,524 | 1,039 | 1,102 |  |
|  | Program |  |  |  |  |
| As of 12/31/2008 | 737 | 747 | 767 | 777 | 787 |
| Program accounting quantities | 4,200 | 1,499 | 1,023 | 1,050 | \* |
| Undelivered units under firm orders1 | 2,270 | 114 | 70 | 350 | 910 |
| Cumulative firm orders2 | 5,026 | 1,524 | 1,039 | 1,098 |  |

\* The accounting quantity for the 787 program will be determined in the year of first airplane delivery.

1 Undelivered units are not adjusted for cancellations subsequent to June 30, 2009, March 31, 2009 and December 31, 2008.

2 Cumulative firm orders represent the cumulative number of commercial jet aircraft deliveries plus undelivered firm orders.

**737 Program** The accounting quantity for the 737 program increased by 200 units during the three months ended June 30, 2009.

**747 Program** There was no change in the accounting quantity for the 747 program during the six months ended June 30, 2009. In the third quarter of 2008, we increased our cost estimates to incorporate the anticipated schedule delay and design changes and reduced margins on the 747 program to zero. We experienced further cost growth in the fourth quarter of 2008 and recorded a charge of $685 million to recognize a reach-forward loss. The charge was primarily related to higher than anticipated costs due to late changes to wing design which drove new load requirements into the fuselage and created other statement of work changes for our suppliers. During the first quarter of 2009, an additional charge of $347 million was recorded. This charge was primarily caused by a reduction in projected delivery price increases associated with escalation and production rate changes. Delivery of the first 747-8 Freighter is targeted for the third quarter of 2010 and the 747-8 Intercontinental is targeted to deliver in the fourth quarter of 2011. A gap between when the last 747-400 is produced and the first 747-8 is delivered will contribute to lower 747 program revenues until deliveries of the 747-8 begin. We believe that the cost and revenue estimates incorporated in the financial statements are appropriate; however, this remains a development program, with the associated inherent risks.

**767 Program** There was no change in the accounting quantity for the 767 program during the six months ended June 30, 2009. In April 2009, we announced a delay in previous plans to increase production.

**777 Program** There was no change in the accounting quantity for the 777 program during the six months ended June 30, 2009. Delivery of the first 777 Freighter occurred in February 2009. In April 2009, we announced that we will lower the production rate on our 777 airplane program, affecting deliveries beginning in June 2010.

**787 Program** On June 23, 2009, we announced that first flight of the 787 was being postponed due to a need to reinforce an area within the side of the body section of the aircraft where the wing joins the fuselage. Prior to the announcement first flight was targeted for second quarter of 2009 with first delivery targeted for the first quarter of 2010. We have now analyzed the problem and have identified a technical solution from among a number of options. We are currently evaluating alternative ways to implement that solution. Development of the aircraft modification and testing plan will follow selection of our implementation solution. Revised target dates for first flight and first delivery will be established following the final determination of the required modification and testing plan. Until we settle on such a plan, we are not in a position to determine schedule impacts. Once we finalize the impacts to schedule we will determine the resulting financial impacts of the schedule modifications. We expect these determinations to be made in the third quarter of 2009.

We continue to address other challenges associated with assembly of the first airplanes, including management of our extended global supply chain, completion and integration of traveled work, weight and systems integration. We are also continuing efforts to satisfy customer mission and performance needs in light of the anticipated weight of their respective aircraft.

The previous flight test and delivery schedule reflected the cumulative impacts of disruption caused by the 2008 IAM strike, the requirement to replace certain fasteners in early production airplanes, parts unavailability, as well as the impact from the challenges mentioned above. We continue to work with our customers and suppliers to assess the specific impacts of schedule changes, including delivery delays and supplier assertions associated with such changes. A number of our customers have contractual remedies for schedule delays and/or performance. We continue to address customer claims and requests for other contractual relief as they arise.

The cumulative impacts of the flight test delays, production challenges, schedule delays and customer and supplier impacts create significant pressure on program revenue and cost estimates. We are assessing our mitigation plans and cost reduction efforts that could address these pressures.

We expect to update revenue and cost estimates in the third quarter of 2009 to incorporate the modification and testing plan, revised production and delivery schedules as well as mitigation plans. It will not be possible until the above described plans are finalized to determine the extent or effect that these delays will have on our financial statements.

### Additional Considerations

The 787 and 747-8 programs highlight the risks that are always inherent in new airplane programs and new derivative airplanes. Costs related to development of new programs and derivative airplanes are generally expensed as incurred. Costs to produce new aircraft are included in inventory and accounted for using program accounting. Airplane programs have risk for reach-forward losses if our estimated production costs exceed our estimated program revenues for the accounting quantity. Generally commercial airplanes are sold on a firm fixed-price basis with an indexed price escalation clause and are often sold several years before scheduled delivery. Each customer purchase agreement contains an escalation clause to account for the effects of economic fluctuations over the period of time from airplane sale to airplane delivery. A price escalation formula based on pre-defined factors is used to determine the final price of the airplane at the time of customer delivery. While firm fixed-price contracts allow us to benefit from cost savings, they also expose us to the risk of cost overruns. Many new airplanes and derivatives have highly complex designs, utilize exotic materials and require extensive coordination and integration with supplier partners. As technical or quality issues arise, such as issues currently being experienced on the 787 program, we may experience schedule delays and higher costs to complete new programs and derivative aircraft. Additionally, price escalation factors may also impact margins by reducing the estimated price of airplanes delivered in the future. Both of these factors may result in a material charge if the program has or is determined to have a reach forward loss. Changes to estimates of the program accounting quantity, production costs and rates, learning curve, unanticipated airplane development issues, costs of derivatives, customer negotiations/settlements, supplier claims and certification issues could also result in lower margins or reach-forward losses. While we believe the cost and revenue estimates incorporated in the financial statements are appropriate, the technical complexity of these programs creates financial risk as additional completion costs may become necessary or scheduled delivery dates could be extended, which could trigger termination provisions, order cancellations or other financially significant exposure.

### Integrated Defense Systems

### Business Environment and Trends

In April 2009, the U.S. Department of Defense (U.S. DoD) announced recommended changes for inclusion in the fiscal year 2010 budget. The President’s budget, submitted to Congress in May 2009, incorporated many of the U.S. DoD recommendations. If these changes are approved by Congress, future funding for a number of our programs including C-17, FCS, F-22, GMD and Transformational Satellite Communications System (TSAT) could be reduced. We will continue to evaluate the defense budget as it progresses through Congress.

### IDS Realignment

Effective January 1, 2009, certain programs were realigned between IDS segments. Business segment data for all periods presented have been adjusted to reflect the realignment. See Note 14.

### Operating Results

*(Dollars in millions)*

|  | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$16,370** | $15,509 | **$8,650** | $7,934 |
| Earnings from operations | **$1,585** | $1,497 | **$876** | $637 |
| Operating margins | **9.7%** | 9.7% | **10.1%** | 8.0% |

*(Dollars in millions)*

|  | June 30 2009 | December 31 2008 |
| --- | ---: | ---: |
| Contractual backlog | **$47,830** | $45,285 |
| Unobligated backlog | **22,204** | 27,719 |

### Revenues

IDS revenues for the six and three months ended June 30, 2009 increased by $861 million and $716 million, a 6% and 9% increase from the same periods in 2008, primarily due to higher volume in the GS&S and N&SS segments during the six months and higher volume in all three segments during the three months.

### Earnings from Operations

IDS operating earnings for the six and three months ended June 30, 2009 increased by $88 million and $239 million. Operating margins were unchanged for the six months and increased 2.1% for the three months compared with the same periods in 2008. Increases were due to higher earnings in the BMA segment primarily resulting from a charge of $248 million recorded in the second quarter of 2008 on the AEW&C program.

### Backlog

IDS total backlog was $70,034 million at June 30, 2009, lower by $2,970 from $73,004 million at December 31, 2008. The decrease was primarily due to current year deliveries and sales on multi-year contracts awarded in prior years with the largest decreases in FCS, GMD and F/A-18 programs.

For further details on the changes between periods, refer to the discussions of the individual segments below.

### Additional Considerations

Our business includes a variety of development programs which have complex design and technical challenges. Many of these programs have cost-type contracting arrangements. In these cases the associated financial risks are primarily in lower profit rates or program cancellation if milestones and technical progress are not accomplished. Examples of these programs include Airborne Laser, EA-18G, Family of Beyond Line-of-Sight Terminals, FCS, GMD, Joint Tactical Radio System, P-8A and Proprietary programs.

Some of our development programs are contracted on a fixed-price basis. Many of these programs have highly complex designs. As technical or quality issues arise, we may experience schedule delays and cost impacts, which could increase our estimated cost to perform the work or reduce our estimated price, either of which could result in a material charge. These programs are ongoing, and while we believe the cost and fee estimates incorporated in the financial statements are appropriate, the technical complexity of these programs creates financial risk as additional completion costs may become necessary or scheduled delivery dates could be extended, which could trigger termination provisions, the loss of satellite in-orbit incentive payments, or other financially significant exposure. These programs have risk for reach-forward losses if our estimated costs exceed our estimated contract revenues. Examples of these programs include Airborne Early Warning and Control (AEW&C), International KC-767 Tanker, commercial and military satellites, Vigilare and High Frequency Modernisation.

### Boeing Military Aircraft

### Operating Results

*(Dollars in millions)*

|  | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$6,373** | $6,467 | **$3,363** | $3,265 |
| Earnings from operations | **$674** | $541 | **$392** | $157 |
| Operating margins | **10.6%** | 8.4% | **11.7%** | 4.8% |

*(Dollars in millions)*

|  | June 30 2009 | December 31 2008 |
| --- | ---: | ---: |
| Contractual backlog | **$28,157** | $25,710 |
| Unobligated backlog | **7,620** | 10,048 |

### Revenues

BMA revenues for the six months ended June 30, 2009 decreased $94 million primarily due to one less C-17 and International KC-767 Tanker delivery in 2009 compared to 2008, partially offset by higher deliveries and volume on several global strike and rotorcraft programs. BMA revenues for the three months ended June 30, 2009 increased by $98 million, a 3% increase compared with the same period in 2008 partially due to higher deliveries on several global strike and rotorcraft programs in 2009 partly offset by one less C-17 delivery compared with the prior year. Revenues for the six and three month periods were negatively impacted in 2009 by a change in delivery mix and lower volume on several global strike aircraft and weapons programs.

Deliveries of units for new-build production aircraft, excluding remanufactures and modifications, were as follows:

|  | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| F/A-18 Models | **23** | 21 | **13** | 11 |
| T-45TS Goshawk | **4** | 3 | **2** | 2 |
| F-15E Eagle | **6** | 4 | **2** |  |
| C-17 Globemaster | **7** | 8 | **4** | 5 |
| KC-767 Tanker | **1** | 2 |  |  |
| AH-64 Apache | **13** | 1 | **8** | 1 |
| CH-47 Chinook | **1** | 4 | **1** | 2 |
| Total new-build production aircraft | **55** | 43 | **30** | 21 |

38

### Earnings from Operations

BMA operating earnings for the six and three months ended June 30, 2009 increased by $133 million and $235 million, a 25% and 150% increase from the same periods in 2008. The increases are primarily due to a charge of $248 million recorded on the AEW&C program in the second quarter of 2008. Earnings for the six months ended June 30, 2009 were also impacted by lower volume and change in contract and delivery mix.

### Backlog

BMA total backlog was $35,777 million at June 30, 2009, virtually unchanged from December 31, 2008. Backlog increases due to current year orders for seventeen C-17 aircraft were offset by revenues recognized on contracts received in prior years.

### Additional Considerations

Items which could have a future impact on BMA operations include the following:

**AEW&C** During 2006, we recorded charges of $770 million and during the second quarter of 2008, we recorded a charge of $248 million related to revised cost and revenue estimates to complete the AEW&C programs in Australia and Turkey. The 2008 charge, primarily related to our program in Australia, was due to subsystem development issues on the electronic warfare and ground support systems and the additional time required for integration testing. These factors required a revised delivery schedule for the Australian aircraft. These delays are not expected to affect delivery schedules to our other AEW&C customers. The AEW&C development program, also known as Wedgetail in Australia, Peace Eagle in Turkey and Peace Eye in the Republic of Korea, consists of a 737-700 aircraft outfitted with a variety of command and control and advanced radar systems, some of which have never been installed on an airplane before. Wedgetail includes six aircraft and Peace Eagle and Peace Eye include four aircraft each. These are advanced and complex fixed-price development programs involving technical challenges at the individual subsystem level and in the overall integration of these subsystems into a reliable and effective operational capability. We believe that the cost and revenue estimates incorporated in the financial statements are appropriate; however, the technical complexity of the programs creates financial risk as additional completion costs may be necessary or scheduled delivery dates could be delayed.

**International KC-767 Tanker Program** During 2008 and 2007, the BMA segment recorded charges of $85 million and $152 million related to this program. The 2007 charge was partially offset at the consolidated level. The International KC-767 Tanker program includes four aircraft for the Italian Air Force and four aircraft for the Japanese Air Self Defense Force. As of June 30, 2009, we delivered three tankers to Japan. These programs are ongoing, and while we believe the revenue and cost estimates incorporated in the financial statements are appropriate, the technical complexity of the programs creates financial risk as additional completion and development costs may be necessary or remaining scheduled delivery dates could be delayed.

**C-17** See the discussion of C-17 in Note 6 Liabilities, Commitments and Contingencies.

### Network and Space Systems

### Operating Results

*(Dollars in millions)*

|  | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$5,781** | $5,498 | **$3,103** | $2,804 |
| Earnings from operations | **$446** | $504 | **$239** | $237 |
| Operating margins | **7.7%** | 9.2% | **7.7%** | 8.5% |

*(Dollars in millions)*

|  | June 30 2009 | December 31 2008 |
| --- | ---: | ---: |
| Contractual backlog | **$7,957** | $8,868 |
| Unobligated backlog | **14,048** | 16,981 |

### Revenues

N&SS revenues for the six and three months ended June 30, 2009 increased by $283 million and $299 million, increases of 5% and 11% compared with the same periods in 2008. Revenue increases in both periods were due to second quarter 2009 increased volume on several satellite programs and a Delta IV commercial launch.

### Earnings from Operations

N&SS operating earnings for the six months ended June 30, 2009 decreased by $58 million, a 12% decrease from the same period in 2008. The decrease is primarily due to charges related to the Sea Launch bankruptcy and lower earnings on our ULA joint venture. Earnings in first quarter of 2008 included a favorable settlement on a civil satellite program. Earnings for the three months ended June 30, 2009 increased $2 million over the same period in 2008. Increased earnings in the quarter on higher volume and higher ULA earnings were offset by the Sea Launch charges.

### Backlog

N&SS total backlog was $22,005 million at June 30, 2009 a decrease of 15% from December 31, 2008. The decrease is primarily due to revenues recognized on FCS GMD and Proprietary programs. On July 17, 2009, we received a partial termination for convenience order from the U.S. Army on a portion of the Manned Ground Vehicle component of the FCS system design and development contract. N&SS contractual and unobligated backlog as of June 30, 2009, does not reflect this partial termination.

### Additional Considerations

Items which could have a future impact on N&SS operations include the following:

**Business Environment and Trends** In June 2009, we received a stop-work order from the U.S. Army on the Manned Ground Vehicle portion of the FCS system design and development contract. We believe the final restructured FCS contract will negatively impact revenue and earnings in the N&SS segment going forward. In addition, we completed the TSAT risk reduction and system definition contract in July 2009 and do not anticipate a future TSAT space segment program competition. As a result of lower than anticipated FCS and TSAT revenue and earnings, we tested N&SS goodwill for impairment. No impairment was indicated by our test. Additional recommended budgetary changes, if included in the budget and approved by Congress, could further impact N&SS programs. We will monitor the defense budget as it progresses through Congress, evaluate its impact on our programs, and test for impairment as appropriate.

**United Launch Alliance** On December 1, 2006, we completed the transaction with Lockheed Martin Corporation (Lockheed) to create a 50/50 joint venture named United Launch Alliance L.L.C. (ULA). ULA combines the production, engineering, test and launch operations associated with U.S.

government launches of Boeing Delta and Lockheed Atlas rockets. In connection with the transaction, we initially contributed net assets of $914 million at December 1, 2006. The book value of our investment exceeds our proportionate share of ULA’s net assets. This difference will be expensed ratably in future years. Based on the adjusted contributions and the conformed accounting policies established by ULA, this amortization is expected to be approximately $15 million annually for the next 15 years.

In connection with the formation of ULA, we each have agreed to extend a line of credit to ULA of up to $200 million to support its working capital requirements during the 5 year period following December 1, 2006. We and Lockheed transferred performance responsibility for certain U.S. government contracts to ULA as of the closing date. We and Lockheed agreed to jointly guarantee the performance of those contracts to the extent required by the U.S. government. We and Lockheed have also each committed to provide ULA with up to $122 million of additional capital contributions in the event ULA does not have sufficient funds to make a required payment to us under an inventory supply agreement. See Note 4.

We agreed to indemnify ULA through December 31, 2020 against potential non-recoverability and non-allowability of $1,360 million of Boeing Delta inventories included in contributed assets plus $1,860 million of inventory subject to an inventory supply agreement which ends on March 31, 2021. Since inception, ULA has sold $922 million of inventories that were contributed by us. As part of its integration, ULA is continuing to assess the future of the Delta II program beyond what is currently on contract. In the event ULA is unable to sell additional Delta II inventory, earnings could be reduced by up to $90 million.

We agreed to indemnify ULA against potential losses that ULA may incur in the event ULA is unable to obtain certain additional contract pricing from the USAF for four satellite missions. We believe ULA is entitled to additional contract pricing. In December 2008, ULA submitted a claim to the USAF to re-price the contract value for two of the four satellite missions covered by the indemnification. In March 2009, the USAF issued a denial of that claim and in June 2009, ULA filed an appeal. If ULA is unsuccessful obtaining additional pricing we may be responsible for some of the shortfall and may record up to $386 million in pre-tax losses associated with the four missions.

**Sea Launch** See the discussion of Sea Launch in Note 6 Liabilities, Commitments and Contingencies.

**Satellites** See the discussions of Boeing Satellite Systems International, Inc. (BSSI) in Note 13 Legal Proceedings.

### Global Services and Support

### Operating Results

*(Dollars in millions)*

|  | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$4,216** | $3,544 | **$2,184** | $1,865 |
| Earnings from operations | **$465** | $452 | **$245** | $243 |
| Operating margins | **11.0%** | 12.8% | **11.2%** | 13.0% |

*(Dollars in millions)*

|  | June 30 2009 | December 31 2008 |
| --- | ---: | ---: |
| Contractual backlog | **$11,716** | $10,707 |
| Unobligated backlog | **536** | 690 |

41

### Revenues

GS&S revenues for the six and three months ended June 30, 2009 increased by $672 million and $319 million, an increase of 19% and 17% compared with the same periods in 2008. The increases for both periods were due to increased volume in the Integrated Logistics (IL) Training Systems and Services, and Defense and Government Services divisions.

### Earnings from Operations

GS&S operating earnings for the six and three months ended June 30, 2009 increased by $13 million and $2 million compared with the same periods in 2008. Higher performance recognition in 2008 on several IL programs and changes in the contract mix reduced the overall GS&S margin by 1.8% for both the six and three month periods ended June 30, 2009.

### Backlog

GS&S total backlog was $12,252 million at June 30, 2009, an increase of 8% from December 31, 2008. The increase was primarily due to significant growth in International Support Systems and Defense and Government Services divisions.

### Boeing Capital Corporation

### Operating Results

*(Dollars in millions)*

|  | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$330** | $364 | **$167** | $179 |
| Earnings from operations | **$73** | $106 | **$36** | $45 |
| Operating margins | **22%** | 29% | **22%** | 25% |

### Revenues

BCC segment revenues consist principally of lease income from equipment under operating lease and interest from financing receivables and notes. BCC’s revenues for the six and three months ended June 30, 2009, decreased $34 million and $12 million when compared with the same periods in 2008 primarily due to lower operating lease income resulting from a smaller portfolio of equipment under operating leases as a result of the return of aircraft and asset dispositions.

### Operating Earnings

BCC’s operating earnings are presented net of interest expense, provision for (recovery of) losses, asset impairment expense, depreciation on leased equipment and other operating expenses. Operating earnings for the six and three months ended June 30, 2009 decreased by $33 million and $9 million due to lower revenues, higher impairment expense and a provision for losses partially offset by lower interest expense.

### Financial Position

The following table presents selected financial data for BCC:

*(Dollars in millions)*

|  | June 30 2009 | December 31 2008 |
| --- | ---: | ---: |
| BCC customer financing and investment portfolio | **$6,255** | $6,023 |
| Valuation allowance as a % of total receivables | **1.9%** | 2.1% |
| Debt | **$3,636** | $3,652 |
| Debt-to-equity ratio | **5.0-to-1** | 5.0-to-1 |

BCC’s customer financing and investment portfolio at June 30, 2009 increased from December 31, 2008 due to the origination of notes receivable partially offset by normal portfolio run-off. At June 30, 2009 and December 31, 2008, BCC had $562 million and $685 million of assets that were held for sale or re-lease, of which $557 million and $305 million had either executed term sheets with deposits or firm contracts to be sold or placed on lease. In March 2009, Mexicana Group committed to lease 25 717 aircraft, including 4 of which were placed on lease and 12 that were held for sale or re-lease at June 30, 2009. The remaining 9 aircraft are currently on lease with Midwest Airlines (Midwest). In May 2009, BCC agreed to a restructuring of lease terms with Midwest under which Midwest is scheduled to return the remaining 9 aircraft by the end of the current year. We do not expect that the return of these aircraft as a result of this restructuring will have a material effect on our financial position, results of operations or cash flow. Aircraft subject to leases with a carrying value of approximately $417 million are scheduled to be returned off lease in the next 12 months. These aircraft are being remarketed or the leases are being extended and $227 million of these aircraft were committed at June 30, 2009.

### Restructurings and Restructuring Requests

As of June 30, 2009, BCC had received a number of requests from both domestic and foreign airlines to reduce lease or rental payments or to otherwise restructure obligations. Whether such requests will result in a material adverse impact on our earnings, cash flow or financial position depends on a number of factors including whether the request is granted, the type of aircraft, the collateral value and market rental rates of the returned aircraft.

### Other Segment

*(Dollars in millions)*

|  | Six months ended June 30 2009 | 2008 | Three months ended June 30 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$74** | $227 | **$35** | $152 |
| Earnings from operations | **$(69)** | $(185) | **$(46)** | $(135) |

Revenues for the six and three months ended June 30, 2009 decreased by $153 million and $117 million compared with the same periods of 2008 primarily due to the sale of a C-17 aircraft in 2008 held under operating lease. Other segment losses for the six and three months ended June 30, 2009 decreased by $116 million and $89 million compared with the same periods of 2008 primarily due to recognition of pre-tax expense of $82 million to increase the allowance for losses on customer financing receivables related to lower U.S. airline customer credit ratings in the three months ended June 30, 2008.

### Liquidity and Capital Resources

### Cash Flow Summary

*(Dollars in millions)*

|  | Six months ended June 30 2009 | 2008 |
| --- | ---: | ---: |
| Net earnings | **$1,608** | $2,063 |
| Non-cash items | **1,038** | 927 |
| Changes in working capital | **(1,452)** | (1,308) |
| Net cash provided by operating activities | **1,194** | 1,682 |
| Net cash used by investing activities | **(846)** | (401) |
| Net cash provided/(used) by financing activities | **960** | (2,733) |
| Effect of exchange rate changes on cash and cash equivalents | **23** | 29 |
| Net increase/(decrease) in cash and cash equivalents | **1,331** | (1,423) |
| Cash and cash equivalents at beginning of year | **3,268** | 7,042 |
| Cash and cash equivalents at end of period | **$4,599** | $5,619 |

**Operating Activities** Net cash provided by operating activities decreased by $488 million to $1,194 million during the six months ended June 30, 2009, primarily due to lower earnings and higher working capital investments, partially offset by lower pension contributions in 2009. The net working capital increase was driven by an increase in receivables from our U.S. government customers, continued investment in development programs, and lower advances from commercial airplane orders. In the corresponding period in 2008, we contributed $517 million to our U.S. pension plans.

**Investing Activities** Cash used by investing activities totaled $846 million during the six months ended June 30, 2009 compared with $401 million used during the same period in 2008. Cash used by investing activities was lower during the six months ended June 30, 2008 largely due to proceeds from investments, net of contributions for the reinvestment of maturities, partially offset by purchases of distribution rights.

**Financing Activities** Cash provided by financing activities totaled $960 million during the six months ended June 30, 2009 compared with $2,733 million used during the six months ended June 30, 2008, primarily due to a decrease in common shares repurchased of $2,014 million and proceeds from borrowings of $1,843 million in 2009. There were no debt issuances during the six months ended June 30, 2008.

During the six months ended June 30, 2009, we repaid $218 million of debt, including scheduled repayments of $203 million of debt held at BCC. The recorded balance of debt as of June 30, 2009 was $9,116 million, of which $416 million was classified as short-term. This includes $3,436 million of debt recorded at BCC, excluding intercompany debt, of which $389 million was classified as short-term.

During the six months ended June 30, 2009, we repurchased 1,173,152 shares at an average price of $42.94 in our open market share repurchase program and 384,150 shares transferred to us from employees in satisfaction of minimum tax withholding obligations associated with the vesting of restricted stock during the period. During the six months ended June 30, 2008, we repurchased 26,574,403 shares at an average price of $78.96 in our open market share repurchase program and 3,400 shares in stock swaps.

**Credit Ratings** Our credit ratings are summarized below:

|  | Fitch | Moody’s | Standard & Poor’s |
| --- | --- | --- | --- |
| Long-term: |  |  |  |
| Boeing/BCC | A+ | A2 | A+ |
| Short-term: |  |  |  |
| Boeing/BCC | F1 | P-1 | A-1 |

On January 29, 2009, Standard & Poor’s (S&P) affirmed Boeing’s and BCC’s A+ credit rating but changed its outlook from stable to negative, citing the challenging commercial aviation environment. On April 10, 2009, S&P placed Boeing’s and BCC’s A+ credit rating on credit watch with negative implications. The rating for short-term borrowing was reaffirmed at A-1. S&P indicated in its April 10, 2009 announcement that they expect any lowering of the long-term ratings in connection with the credit watch placement would likely be limited to one notch, which would be to an ‘A’ rating. On April 30, 2009, Fitch Ratings affirmed Boeing’s and BCC’s A+ credit rating but changed its outlook from stable to negative. On July 7, 2009, Moody’s affirmed Boeing’s A2 credit rating.

**Capital Resources** We believe we have substantial borrowing capability. We and BCC have commercial paper programs that continue to serve as significant potential sources of short-term liquidity. As of June 30, 2009, neither we nor BCC had any outstanding commercial paper issuances. Currently, we have $3,000 million ($1,500 million exclusively available for BCC) of unused borrowing on revolving credit line agreements. We anticipate that these credit lines will primarily serve as backup liquidity to support possible commercial paper borrowings in 2009. BCC has a $5,000 million shelf registration statement that was declared effective on November 12, 2008 under which it may offer debt securities. BCC has not issued any debt securities under this registration statement, and the entire $5,000 million remains available for issuance.

On March 9, 2009, we filed a public shelf registration with the U.S. Securities and Exchange Commission for the issuance of an indeterminate amount of debt securities and common stock. On March 13, 2009, we issued notes totaling $1,850 million under the registration statement. The net proceeds after deducting the discount, underwriting fees and issuance costs were $1,817 million.

We believe our ability to access external capital resources should be sufficient to satisfy existing short-term and long-term commitments and plans. In the event we require additional funding to support strategic business opportunities, commercial aircraft financing commitments, unfavorable resolution of loss contingencies, or other business requirements, we expect to meet increased funding requirements by issuing commercial paper or term debt. At this point in time, our access to liquidity sources has not been materially impacted by the current credit environment, and we do not expect that it will be materially impacted in the near future. There can be no assurance that the cost or availability of future borrowings, if any, under our commercial paper program, in the debt markets or our credit facilities will not be materially impacted by further capital market disruptions.

We had negative Shareholders’ equity as a result of the remeasurement of our pension assets and obligations at December 31, 2008. We do not expect negative Shareholders’ equity to affect our ability to pay dividends or comply with debt covenants. However, additional deterioration in the funded status of our pension plans may result in additional contributions to those plans.

As of June 30, 2009, we continue to be in full compliance with all covenants contained in our debt agreements.

### Off-Balance Sheet Arrangements

We are a party to certain off-balance sheet arrangements including certain guarantees. For discussion of these arrangements, see Note 7.

### Contingent Obligations

We have significant contingent obligations that arise in the ordinary course of business, which include the following:

**Legal** Various legal proceedings, claims and investigations are pending against us. Legal contingencies are discussed in Note 13, including our contesting the default termination of the A-12 aircraft, litigation/arbitration involving BSSI and employment and benefits litigation brought by several of our employees.

**Environmental Remediation** We are involved with various environmental remediation activities and have recorded a liability of $742 million at June 30, 2009. For additional information, see Note 6.

**Income Taxes** We have recorded a net liability of $1,495 million at June 30, 2009 for uncertain tax positions. For further discussion of income taxes, see Note 3.

## Controls and procedures

As filed, 2,909 characters.

(a) Our Annual Meeting of Shareholders was held on April 27, 2009.

(b) In an uncontested election, nine nominees of the Board of Directors were elected for one-year terms expiring on the date of the annual meeting in 2010. The votes were as follows:

|  | For | Against | Abstain |
| --- | ---: | ---: | ---: |
| John H. Biggs | 560,291,204 | 38,010,741 | 6,481,204 |
| John E. Bryson | 546,109,041 | 51,936,837 | 6,737,271 |
| Arthur D. Collins, Jr. | 565,488,044 | 32,381,752 | 6,913,353 |
| Linda Z. Cook | 551,872,988 | 46,374,578 | 6,535,583 |
| William M. Daley | 579,256,197 | 19,186,380 | 6,340,572 |
| Kenneth M. Duberstein | 554,564,218 | 43,434,819 | 6,784,112 |
| John F. McDonnell | 568,014,507 | 31,382,390 | 5,386,253 |
| W. James McNerney, Jr. | 576,253,493 | 23,033,652 | 5,496,004 |
| Mike S. Zafirovski | 554,342,928 | 43,744,510 | 6,695,711 |

(c) The results of voting on Proposals 2 through 10 (as numbered in the 2009 Proxy Statement) were as follows:

2\. Management proposal to approve an amendment to The Boeing Company 2003 Incentive Stock Plan:

|  | Number of Votes |
| --- | ---: |
| For | 309,722,229 |
| Against | 174,390,732 |
| Abstain | 5,865,129 |
| Broker non-votes | 114,805,060 |

3\. Advisory vote on appointment of Deloitte & Touche LLP as independent auditor:

|  | Number of Votes |
| --- | ---: |
| For | 564,503,022 |
| Against | 35,029,439 |
| Abstain | 5,250,688 |
| Broker non-votes | 0 |

4\. Shareholder proposal on cumulative voting:

|  | Number of Votes |
| --- | ---: |
| For | 159,908,676 |
| Against | 324,474,176 |
| Abstain | 5,608,162 |
| Broker non-votes | 114,792,135 |

48

5\. Shareholder proposal on an advisory vote on named executive officer compensation:

|  | Number of Votes |
| --- | ---: |
| For | 188,671,326 |
| Against | 288,494,486 |
| Abstain | 12,821,477 |
| Broker non-votes | 114,795,860 |

6\. Shareholder proposal on health care principles:

|  | Number of Votes |
| --- | ---: |
| For | 40,171,657 |
| Against | 380,996,151 |
| Abstain | 68,822,006 |
| Broker non-votes | 114,793,335 |

7\. Shareholder proposal on disclosure of foreign military sales:

|  | Number of Votes |
| --- | ---: |
| For | 36,305,596 |
| Against | 391,211,218 |
| Abstain | 62,473,000 |
| Broker non-votes | 114,793,335 |

8\. Shareholder proposal on independent lead director:

|  | Number of Votes |
| --- | ---: |
| For | 142,574,595 |
| Against | 340,974,121 |
| Abstain | 6,443,098 |
| Broker non-votes | 114,791,335 |

9\. Shareholder proposal on future severance arrangements:

|  | Number of Votes |
| --- | ---: |
| For | 160,665,915 |
| Against | 319,449,117 |
| Abstain | 9,866,782 |
| Broker non-votes | 114,801,335 |

10\. Shareholder proposal on disclosure of political contributions:

|  | Number of Votes |
| --- | ---: |
| For | 124,421,105 |
| Against | 313,529,732 |
| Abstain | 52,038,978 |
| Broker non-votes | 114,793,335 |

49

## Risk factors

As filed, 339 characters.

There have been no material changes in our risk factors from those disclosed in Part 1, Item 1A. Risk Factors in our 2008 Annual Report on Form 10-K for the year ended December 31, 2008, other than the risk factors updated in Part II, Item 1, Risk Factors in our Quarterly Report on Form 10-Q for the quarterly period ended March 31, 2009.

Filed Jul 22, 2009.
Source: SEC EDGAR, the filing index for accession 0001193125-09-152905. Last ingested by Listed: Nov 14, 2026, 13:59 ET. No prices; not investment advice.