## Management's discussion and analysis

As filed, 204,295 characters.

The following discussion updates “Management’s Discussion and Analysis of Financial Condition and Results of Operations” incorporated by reference in HEI’s and HECO’s Form 10-K for the year ended December 31, 2008 and should be read in conjunction with the annual (as of and for the year ended December 31, 2008) included in HEI’s and HECO’s Form 8-K dated June 9, 2009, and the quarterly (as of and for the three months ended March 31, 2009, and as of and for the three and six months ended June 30, 2009) consolidated financial statements of HEI and HECO and accompanying notes included in the Forms 10-Q for the first and second quarters of 2009.

### HEI Consolidated

### RESULTS OF OPERATIONS

*(in thousands, except per share amounts)*

|  | Three months ended June 30, 2009 | 2008 | % change | Primary reason(s) for significant change\* |
| --- | ---: | ---: | ---: | --- |
| Revenues | $525,901 | $774,055 | (32) | Decrease for the electric utility and the bank segments |
| Operating income | 35,055 | 21,602 | 62 | Increase for the bank segment (resulting from the impact of the June 2008 balance sheet restructuring), partly offset by decrease for the electric utility segment |
| Net income for common stock | 15,479 | 5,136 | 201 | Higher operating income, higher AFUDC, lower “interest expense—other than on deposit liabilities and other bank borrowings”, partly offset by higher income taxes\*\* |
| Basic earnings per common share | $0.17 | $0.06 | 183 | Higher net income, partly offset by higher weighted average shares outstanding |
| Weighted-average number of common shares outstanding | 91,384 | 84,052 | 9 | Issuances of shares through a common stock offering in December 2008 and the HEI Dividend Reinvestment and Stock Purchase Plan and other Company plans |

53

*(in thousands, except per share amounts)*

|  | Six months ended June 30 2009 | 2008 | % change | Primary reason(s) for significant change\* |
| --- | ---: | ---: | ---: | --- |
| Revenues | $1,069,698 | $1,503,672 | (29) | Decrease for the electric utility and the bank segments |
| Operating income | 79,713 | 92,348 | (14) | Decrease for the electric utility segment, partly offset by an increase for the bank segment (resulting from the impact of the June 2008 balance sheet restructuring) |
| Net income for common stock | 35,874 | 39,103 | (8) | Lower operating income, partly offset by higher AFUDC and lower “interest expense—other than on deposit liabilities and other bank borrowings” |
| Basic earnings per common share | $0.39 | $0.47 | (17) | Lower net income and higher weighted average shares outstanding |
| Weighted-average number of common shares outstanding | 90,996 | 83,762 | 9 | Issuances of shares through a common stock offering in December 2008 and the HEI Dividend Reinvestment and Stock Purchase Plan and other Company plans |

\* Also, see segment discussions which follow.

\*\* The Company’s effective tax rates (federal and state) for the second quarters of 2009 and 2008 were 31% and 13%, respectively. The effective tax rate for the second quarter of 2008 reflects the effect of utilizing state tax credits against a significantly lower income tax expense base. The Company’s effective tax rate for the first six months of 2009 and 2008 were 34%.

***Dividends.*** The payout ratios for 2008 and the first six months of 2009 were 116% and 159%, respectively. Excluding the $35.6 million net charge related to ASB’s balance sheet restructuring (and disregarding other adjustments to net income that would be necessary to more fully reflect the impact on net income if the restructuring had not occurred), the payout ratio for 2008 would have been 83%. HEI currently expects to maintain the dividend at its present level; however, the HEI Board of Directors evaluates the dividend quarterly and considers many factors in the evaluation, including but not limited to the Company’s results of operations, the long-term prospects for the Company, and current and expected future economic conditions.

### Economic conditions

*Note: The statistical data in this section is from public third-party sources (e.g., Department of Business, Economic Development and Tourism; University of Hawaii Economic Research Organization; Hawaii Department of Labor and Industrial Relations; Honolulu Board of Realtors; Kauai Board of Realtors; Realtors Association of Maui; Realty Trac; Blue Chip Financial Forecasts; and local newspapers).*

On a national level, improving economic data referred to as “green shoots” are appearing. The Blue Chip Economic Indicators survey in July 2009 reflects that a majority of the economists polled expect that, in the third quarter of 2009, the National Bureau of Economic Research will declare that the deepest recession since at least World War II is over. The Blue Chip Financial Forecast consensus dated July 1, 2009 reported real gross domestic product (GDP) decreased by 1.8% for the second quarter of 2009 but predicted GDP to increase by 0.7% and 1.8% in the third and fourth quarters of 2009, respectively. Consumer confidence at June 30, 2009 improved from March 31, 2009, but remains at the low level of 49.3 (1985=100) and consumer spending is negatively impacted by the higher savings trend.

Interest rates remained low during the second quarter of 2009, including relatively low mortgage rates. The low level of interest rates continued to put downward pressure on yields on loans and investments, but also contributed to lower deposit and borrowing costs.

While the national economy has signs of “green shoots,” the Hawaii economy continues to be weak and generally lags the U.S. economy in recovery. For the second quarter of 2009, the Hawaii economy continued to decline although stabilization is expected by the end of the year. Hawaii economic growth as measured by the change in real personal income is predicted to be lower by 2.7% in 2009 and 0.6% in 2010 before a moderate recovery begins in 2011.

The challenging economic environment has resulted in the State revising its estimate for the budget shortfall through June 2011 to $786 million, an increase of $56 million from the prior estimate of $730 million in May 2009. Governor Lingle is currently reviewing remedies to address the budget shortfall that includes layoffs, spending restrictions and/or furloughs.

At 7.4%, seasonally-adjusted Hawaii unemployment at the end of June 2009 remains well below the national average of 9.5%, but remains much higher than the average annual rates of 2.6% for 2007 and 4% for 2008. The Hawaii unemployment rate is expected to be 7.4% in 2009, 8.1% in 2010 and gradually recede beginning in 2011. Declines in tourism-related sectors and construction will result in job losses. The job base is expected to contract by 2.9% in 2009 and by 0.6% in 2010 before recovery begins.

Weakness is most notable in one of the state’s largest industries, tourism, which is affected by the health of the U.S. and key international economies, especially Japan. Total visitor arrivals declined 9.8% in the first half of 2009 compared to the same period in 2008. U.S. arrivals appear to have stabilized and Hawaii’s largest source of visitor arrivals, the Pacific coast states, experienced consecutive increases of 5.4% and 4.9% in May and June 2009, respectively, compared to the same periods in 2008. However, the H1N1 flu epidemic is expected to further reduce Japanese travel resulting in the outlook for 2009 Japanese visitor arrivals to be nearly 14% lower than their 2008 level. Total visitor arrivals in 2009 are expected to be down approximately 6.8% from 2008 levels, followed by an increase of 3.1% in 2010. The weakness in tourism is expected to impact the neighbor island economies more than Oahu because their economies rely more on tourism. Job losses for 2009 in the accommodation and food service sectors are estimated to be 6% or greater on Maui and Kauai and nearly 9% on the island of Hawaii. This compares to the estimated 2.5% decline for 2009 for Oahu. Visitor expenditures for 2009 were revised downward and are estimated to be down 10% from 2008.

Occupancy rates at Hawaii hotels are expected to average 66% in 2009 and remain below 70% until 2012. Aggressive pricing is expected to continue, resulting in an estimated 12% lower average daily room rate for 2009 compared to 2008.

The Oahu housing market continued to contract during the second quarter of 2009. Home sales for the first half of 2009 decreased 21.7% compared with the same period in 2008 with the median sales price of $570,000, down 9.4% compared with the same period last year. Local authorities note that while the housing market is still weak, there are indications that the worst may be over. Home sales rebounded slightly in June and sales speed of 45 days was the fastest in 2009. The Maui and Kauai housing markets are weaker than Oahu’s. For the first half of 2009, Maui and Kauai experienced home sales declines of 41% and 30% and price declines of 14% and 27%, respectively. The finite supply of developable land in Hawaii has been a stabilizing force although the pessimistic outlook for jobs and job growth puts downward pressure on prices and increases the risk for additional foreclosures. Foreclosures in Hawaii continue to rise. For the first half of 2009, the State of Hawaii had a foreclosure rate per housing unit of 1/141, a nearly 300% increase compared to the same period in 2008. The neighbor islands are experiencing a higher foreclosure rate than Oahu. For the first half of 2009, the foreclosure rate per housing unit was 1/81 for Kahului/Wailuku, Maui, 1/88 for Hilo, Hawaii and 1/98 for Kapaa, Kauai. While these rates are close to the U.S. average of 1/84, they are significantly higher than the 1/207 rate experienced in Honolulu.

The global tightening of credit and recession has impacted the Hawaii construction industry. Commercial and resort building are hampered by financing constraints and a weak national outlook. Residential construction is expected to decline as income and wealth losses undermine housing demand. Government spending initiatives may provide substantial support for the industry in the medium term. Construction activity, as measured by permitting activity (excluding military construction) declined 43% in the first half of 2009 compared with the same period in 2008.

Overall, the Hawaii economy remains weak but is expected to stabilize by the end of the year and there are some signs of modest recovery in the U.S. and Japan economies.

***Emergency Economic Stabilization Act of 2008 and American Economic Recovery and Reinvestment Act of 2009.*** The Emergency Economic Stabilization Act of 2008 (the 2008 Act) was signed into law on October 3, 2008. The principal parts of the 2008 Act are: (1) a $700 billion financial markets stabilization plan; and (2) $150 billion in tax benefits, which are partially offset by $40 billion in revenue raisers. As part of its energy and conservation related incentives, the 2008 Act allows public utility property to qualify for the energy credit for periods after February 13, 2008 and extends the credit for solar energy property, fuel cell property and microturbine property through December 31, 2016. In addition, the 2008 Act allows the credit for combined heat and power (CHP) system property as energy property for periods after October 3, 2008. Further, the 2008 Act extends the renewable production credit through December 31, 2009 for qualified wind and refined coal production facilities and through December 31, 2010 for other sources. The 2008 Act also provides for a 10-year accelerated depreciation period for smart electric meters and smart electric grid equipment for property placed in service after October 3, 2008. Finally, the 2008 Act extends the per-gallon incentives for biodiesel and alternative fuels through December 31, 2009. The tax provisions of the 2008 Act did not have a material effect on the Company’s results of operations for 2008. These tax provisions, however, may influence the Company’s decisions to invest in the various properties entitled to credits and favorable depreciation. The Company will continue to analyze the 2008 Act for its impacts on results of operations, financial condition and liquidity and for the opportunities it presents.

The American Economic Recovery and Reinvestment Act of 2009 (the 2009 Act) was signed into law on February 17, 2009 at a total cost of $787 billion. The 2009 Act, which is intended to provide a stimulus to the U.S. economy in the midst of the global financial crisis, is comprised of tax relief, spending on infrastructure, health care and alternative energy and aid to states and local governments. The 2009 Act includes more than $300 billion in tax relief, which is focused primarily on low and middle income taxpayers and small businesses. The energy provisions set in motion President Obama’s campaign promises to implement a “green’ economic recovery.

The extension through 2009 of bonus depreciation, as originally provided in the 2008 Economic Stimulus Act, has the most direct and immediate impact on the Company. Although not quantified, the additional tax depreciation deduction will increase deferred income taxes and provide positive cash flow. The energy related provisions of the 2009 Act may impact utility operations indirectly. Some of the energy incentives are as follows: (1) a 30% tax credit of up to $1,500 for the purchase of highly efficient residential air conditioners, heat pumps or furnaces, (2) $0.3 billion in rebates for purchases of efficient appliances, (3) $20 billion for “green” jobs to make wind turbines and solar panels and to improve energy efficiency in schools and federal buildings, (4) $6 billion in loan guarantees for renewable energy projects, (5) $5 billion to help low-income homeowners make energy improvements, (6) $11 billion to modernize and expand the U.S. electric power grid, (7) $2 billion for research into batteries for future electric cars and (8) the extension of existing energy incentives and the addition of a few new ones. Finally, the 2009 Act temporarily eliminates the alternative minimum tax preference item for private activity bond interest for bonds (such as special purpose revenue bonds issued by HECO and its subsidiaries) issued in 2009 and 2010, including the $150 million of special purpose revenue bonds issued for the benefit of HECO and HELCO on July 30, 2009. This favorable change may influence the utilities’ decision to participate in issuances of additional bonds before the end of 2010.

The Company will continue to analyze the 2009 Act for its impacts on results of operations, financial condition and liquidity and for the opportunities it presents.

***Retirement benefits.*** For the first six months of 2009, the Company’s defined benefit retirement plans’ assets generated a return, net of investment management fees, of 7.0%. The market value of the defined benefit retirement plans’ assets as of June 30, 2009 was $761 million compared to $726 million at December 31, 2008, an increase of approximately $35 million.

Additional guidance on funding relief for qualified defined benefit pension plans was received in March 2009 including: (1) IRS Notice 2009-22 related to the application of new asset valuation rules included in the “Worker, Retiree, and Employer Recovery Act of 2008” and (2) publication of a “Special Edition March 2009 employee plans news” related to yield curve selection for the target liability calculation. As a result, the Company estimates that the cash funding for the qualified defined benefit pension plans in 2009 and 2010 will be about $16 million and $48 million, respectively, which should fully satisfy the minimum required contribution, including requirements of the utilities pension tracking mechanisms and the Plan’s funding policy. Prior to the March 2009 funding relief measures, cash funding to satisfy the minimum required contribution in 2009 and 2010 was estimated to be $21 million and $64 million, respectively.

Other factors could cause changes to the required contribution levels. The Pension Protection Act provides that if a pension plan’s funded status falls below certain levels more conservative assumptions must be used to value obligations and restrictions on participant benefit accruals may be placed on the plans.

***Commitments and contingencies***. See Note 7 of HEI’s “Notes to Consolidated Financial Statements.”

***Recent accounting pronouncements and interpretations***. See Note 9 of HEI’s “Notes to Consolidated Financial Statements.”

### “Other” segment

*(in thousands)*

|  | Three months ended June 30, 2009 | 2008 | % change | Primary reason(s) for significant change |
| --- | ---: | ---: | --- | --- |
| Revenues | $(15) | $(16) | NM |  |
| Operating loss | (2,614) | (2,802) | NM | Lower expenses, including executive compensation and consulting fees |
| Net loss | (4,037) | (4,203) | NM | See explanation for operating loss |

*(in thousands)*

|  | Six months ended June 30, 2009 | 2008 | % change | Primary reason(s) for significant change |
| --- | ---: | ---: | --- | --- |
| Revenues | $(47) | $(132) | NM | Lower unrealized losses on venture capital investments |
| Operating loss | (6,146) | (6,402) | NM | See explanation for revenues and lower expenses, including proxy costs |
| Net loss | (8,656) | (9,397) | NM | See explanation for operating loss and lower interest expense |

NM Not meaningful.

The “other” business segment includes results of operations of HEI and American Savings Holdings, Inc., holding companies; HEI Investments, Inc. (HEIII), a company previously holding investments in leveraged leases; Pacific Energy Conservation Services, Inc., a contract services company primarily providing wind farm operational and maintenance services to an affiliated electric utility; HEI Properties, Inc., a company holding passive, venture capital investments; The Old Oahu Tug Service, Inc., a maritime freight transportation company that ceased operations in 1999; and eliminations of intercompany transactions. Since HEIII sold all of its leveraged lease investments by the end of 2007, HEIII has filed articles of dissolution and is winding up its affairs.

### FINANCIAL CONDITION

### Liquidity and capital resources

Despite the recent unprecedented deterioration in the capital markets and tightening of credit, the Company believes that its ability to generate cash, both internally from electric utility and banking operations and externally from issuances of equity and debt securities, commercial paper and bank borrowings, is adequate to maintain sufficient liquidity to fund its contractual obligations and commercial commitments, its forecasted capital expenditures and investments, its expected retirement benefit plan contributions and other cash requirements in the foreseeable future.

The consolidated capital structure of HEI (excluding ASB’s deposit liabilities and other borrowings) was as follows as of the dates indicated:

*(in millions)*

|  | June 30, 2009 |  | December 31, 2008 |  |
| --- | ---: | ---: | ---: | ---: |
| Short-term borrowings—other than bank | $55 | 2% | $— | —% |
| Long-term debt, net—other than bank | 1,215 | 45 | 1,212 | 46 |
| Noncontrolling interest: cumulative preferred stock of subsidiaries | 34 | 1 | 34 | 1 |
| Common stock equity | 1,402 | 52 | 1,389 | 53 |
|  | $2,706 | 100% | $2,635 | 100% |

As of August 1, 2009, the Standard & Poor’s (S&P) and Moody’s Investors Service’s (Moody’s) ratings of HEI securities were as follows:

|  | S&P | Moody’s |
| --- | --- | --- |
| Commercial paper | A-3 | P-2 |
| Senior unsecured debt | BBB | Baa2 |

The above ratings reflect only the view of the applicable rating agency at the time the ratings are issued, from whom an explanation of the significance of such ratings may be obtained. Such ratings are not recommendations to buy, sell or hold any securities; such ratings may be subject to revision or withdrawal at any time by the rating agencies; and each rating should be evaluated independently of any other rating.

HEI’s overall S&P corporate credit rating is BBB/Negative/A-3 and S&P’s outlook for HEI is “negative.” HEI’s issuer rating by Moody’s is Baa2 and Moody’s outlook for HEI is “negative.”

The rating agencies use a combination of qualitative measures (e.g., assessment of business risk that incorporates an analysis of the qualitative factors such as management, competitive positioning, operations, markets and regulation) as well as quantitative measures (e.g., cash flow, debt, interest coverage and liquidity ratios) in determining the ratings of HEI securities. In May 2009, S&P revised HEI’s outlook to negative from stable, and lowered its commercial paper rating to “A-3” from “‘A-2”’. S&P indicated the rating actions reflected its view that the next two years are likely to be challenging for HEI's electric utilities, which HEI relies on for cash flows to service its own obligations, chiefly debt repayment and common stock distributions. S&P stated that the deterioration in the Hawaii economy is likely to weaken 2009 and 2010 consolidated metrics, which it observed have been only marginally supportive of the “BBB” corporate credit ratings currently assigned to HEI.

S&P designates business risk profiles as “excellent,” “strong,” “satisfactory,” “fair,” “weak” or “vulnerable.” S&P’s financial risk designations are “minimal,” “modest,” “intermediate,” “significant,” “aggressive” and “highly leveraged.” In August 2009, S&P listed HEI’s business risk profile as “strong” and financial risk profile as “significant.”

On July 20, Moody’s issued a news release in which it indicated it had changed HEI’s rating outlook to negative from stable and affirmed HEI’s long-term and short-term (commercial paper) ratings. Moody’s indicated that the rating affirmation reflects the fact that notwithstanding the issues outlined in the release, HEI’s financial metrics are reasonably positioned in its rating category. See discussion below regarding the negative outlook.

Subsequently on August 3, 2009, Moody’s issued a credit opinion on HEI. Regarding the negative rating outlook, Moody’s indicated that “HEI’s negative rating outlook reflects the impact of a weakened economy that is affecting electric demand and electric sales resulting in weaker financial performance, which may be influencing the outcome of state regulatory decisions, the high dividend payout ratio, the existence of a negative rating outlook at ASB and the concentration risk that exists at HEI from the very high dependence on the Hawaiian economy.” Moody’s stated that “\[t\]he rating could be downgraded should weaker than expected economic growth and regulatory support emerge at HECO which ultimately causes earnings and sustainable cash flows to suffer over an extended period.” Consequently, if Moody’s expectations regarding the future sustainable levels of the Company’s consolidated financial ratios were to shift such that expectations for FFO (Funds From Operations, defined as net cash flow from operations less net changes in working capital items) to Adjusted Debt were to fall below 16% (15% last twelve months as of March 31, 2009-latest reported by Moody’s) or expectations for FFO to Adjusted Interest were less than 3.5x (3.3x last twelve months as of March 31, 2009-latest reported by Moody’s) on a sustained basis, the rating could be lowered.

See the electric utilities’ and bank’s respective “Liquidity and capital resources” sections below for the ratings of HECO and ASB.

Information about HEI’s short-term borrowings and line of credit facility was as follows:

*(in millions)*

| Short-term borrowings 1 | Six months ended June 30, 2009 Average balance | End-of-period balance | December 31, 2008 |
| --- | ---: | ---: | ---: |
| HEI commercial paper | $— | $— | $— |
| HEI line of credit draws | — | — | — |
| Line of credit facility (expiring March 31, 2011) 1 |  | $100 | $100 |
| Undrawn capacity under HEI’s line of credit facility 2 |  | 100 | 100 |

1 In the future, the Company may seek to enter into new lines of credit and may also seek to increase the amount of credit available under such lines as management deems appropriate. This table does not include HECO’s separate commercial paper issuances and line of credit facilities and draws.

2 At August 1, 2009, there was no outstanding commercial paper balance and the line of credit facility was undrawn.

HEI utilizes short-term debt, typically commercial paper, to support normal operations, to refinance commercial paper, to retire long-term debt and for other temporary requirements. HEI also periodically makes short-term loans to HECO to meet HECO’s cash requirements, including the funding of loans by HECO to HELCO and MECO. As of June 30, 2009, HEI had no short-term borrowings outstanding and had short-term loans to HECO of $46 million. HEI expects that it will require short-term borrowings in the latter half of 2009. Since HEI’s commercial paper rating has been downgraded to A-3/P-2, management believes that it will access the commercial paper market at higher prices and shorter maturities, or access may be unreliable. Such limitations could cause HEI to draw on its syndicated credit facility instead. Management believes that if HEI’s commercial paper ratings were to be further downgraded, or if credit markets for commercial paper with HEI’s ratings or otherwise were to further tighten, it would be even more difficult and expensive to sell commercial paper or it might not be able to sell commercial paper in the future.

In November 2008, HEI filed an omnibus registration statement to register an indeterminate amount of debt, equity and hybrid securities. Under Securities and Exchange Commission (SEC) regulations, this registration statement expires on November 4, 2011. On December 2, 2008, HEI offered and priced under the registration a public offering of 5,000,000 shares of its common stock at $23 per share for gross proceeds of $115 million. HEI used the net proceeds of approximately $110 million, after deduction of underwriting discounts and commissions and estimated HEI expenses, to repay its outstanding short-term indebtedness, to make loans to HECO and for working capital and other general corporate purposes. An over-allotment option granted to the underwriters was not exercised.

Starting April 16, 2009, HEI began satisfying the common stock requirements of its Dividend Reinvestment and Stock Purchase Plan and the Hawaiian Electric Industries Retirement Savings Plan through open market purchases of its common stock. Prior to April 16, 2009, issuances of common stock for these plans were a source of capital for HEI and provided new capital of $43 million in 2008 and $41 million in 2007. Management continuously evaluates the company’s capital needs in determining how long to continue open market purchases.

For the first six months of 2009, net cash provided by operating activities of consolidated HEI was $180 million. Net cash provided by investing activities for the same period was $193 million, primarily due to net decreases in loans receivable and investment and mortgage-related securities at ASB, partly offset by HECO’s consolidated capital expenditures. Net cash used in financing activities during this period was $291 million as a result of several factors, including net decreases in other bank borrowings, retail repurchase agreements and deposit liabilities and the payment of common stock dividends, partly offset by a net increase in short-term borrowings, proceeds from the issuance of common stock under HEI plans (before such plans began satisfying their requirements through open market purchases) and funds from the drawdown of SPRB proceeds.

Forecasted HEI consolidated “net cash used in investing activities” (excluding “investing” cash flows from ASB) for 2009 through 2011 consists primarily of the net capital expenditures of HECO and its subsidiaries. In addition to the funds required for the electric utilities’ construction program, approximately $150 million will be required in 2011 to repay maturing HEI medium-term notes, which are expected to be repaid with the proceeds from the issuance of commercial paper, bank borrowings, common stock issued under Company plans and/or dividends from subsidiaries. Additional debt and/or equity financing may be utilized to pay down commercial paper or other short-term borrowings or may be required to fund uncertain or unanticipated expenditures not included in the 2009 through 2011 forecast, such as increases in the costs of or an acceleration of the construction of capital projects of the utilities, utility capital expenditures that may be required by the HCEI or new environmental laws and regulations, unbudgeted acquisitions or investments in new businesses, significant increases in retirement benefit funding requirements and higher tax payments that would result if certain tax positions taken by the Company do not prevail. In addition, existing debt may be refinanced prior to maturity (potentially at more favorable rates) with additional debt or equity financing (or both).

The Company was not required to make any contributions to the qualified pension plans to meet minimum funding requirements pursuant to ERISA for 2008, but made voluntary contributions in 2008. Contributions to the retirement benefit plans totaled $15 million in 2008 (comprised of $14 million made by the utilities, $1 million by HEI and nil by ASB) and are expected to total $27 million in 2009 ($26 million by the utilities, $1 million by HEI and nil by ASB). Depending on the performance of the assets held in the plans’ trusts and numerous other factors, additional contributions may be required in the future to meet the minimum funding requirements of ERISA or to pay benefits to plan participants. Although credit markets have tightened and may tighten further, the Company believes it will have adequate access to capital resources to support any necessary funding requirements.

### CERTAIN FACTORS THAT MAY AFFECT FUTURE RESULTS AND FINANCIAL CONDITION

The Company’s results of operations and financial condition can be affected by numerous factors, many of which are beyond the Company’s control and could cause future results of operations to differ materially from historical results. For information about certain of these factors, see pages 12 to 13, 39 to 44, and 53 to 55 of HEI’s MD&A, which is filed in HEI Exhibit 99.1 to HEI’s Form 8-K dated June 9, 2009.

Additional factors that may affect future results and financial condition are described on pages iv and v under “Forward-Looking Statements.”

### MATERIAL ESTIMATES AND CRITICAL ACCOUNTING POLICIES

In preparing financial statements, management is required to make estimates and assumptions that affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities and the reported amounts of revenues and expenses. Actual results could differ significantly from those estimates.

In accordance with SEC Release No. 33-8040, “Cautionary Advice Regarding Disclosure About Critical Accounting Policies,” management has identified the accounting policies it believes to be the most critical to the Company’s financial statements—that is, management believes that these policies are both the most important to the portrayal of the Company’s financial condition and results of operations, and currently require management’s most difficult, subjective or complex judgments.

For information about these material estimates and critical accounting policies, see pages 13 to 14, 44 to 45, and 56 of HEI’s MD&A, which is filed in HEI Exhibit 99.1 to HEI’s Form 8-K dated June 9, 2009.

Following are discussions of the results of operations, liquidity and capital resources of the electric utility and bank segments.

### Electric utility

### RESULTS OF OPERATIONS

*(dollars in thousands, except per barrel amounts)*

|  | Three months ended June 30, 2009 | 2008 | % change | Primary reason(s) for significant change |
| --- | ---: | ---: | ---: | --- |
| Revenues | $450,417 | $688,121 | (35) | Lower fuel oil and purchased energy fuel costs, the effects of which are generally passed on to customers ($215 million), lower KWH sales ($21 million) and lower DSM costs recovered through a surcharge ($1 million) |
| Expenses |  |  |  |  |
| Fuel oil | 131,885 | 273,755 | (52) | Lower fuel oil costs and less KWHs generated |
| Purchased power | 115,189 | 177,226 | (35) | Lower fuel costs and less KWHs purchased |
| Other operation | 63,181 | 59,422 | 6 | See “Results – three months ended June 30, 2009” below |
| Maintenance | 29,431 | 23,990 | 23 | See “Results – three months ended June 30, 2009” below |
| Depreciation | 36,425 | 35,401 | 3 | Additions to plant in service in 2008 |
| Taxes, other than income taxes | 41,975 | 62,371 | (33) | Decrease in revenues |
| Other | 168 | 560 | (70) |  |
| Operating income | 32,163 | 55,396 | (42) | Lower sales and higher other operation and maintenance (O&M) and depreciation expenses |
| Net income for common stock | 15,495 | 27,432 | (44) | Lower operating income, partly offset by higher AFUDC |
| Kilowatthour sales (millions) | 2,400 | 2,476 | (3) | Slowing economy, customer conservation, cooler, less humid weather on Oahu and the effect of an additional leap year day in February 2008 |
| Cooling degree days (Oahu) | 1,244 | 1,295 | (4) |  |
| Average fuel oil cost per barrel | $50.69 | $104.78 | (52) |  |

61

*(dollars in thousands, except per barrel amounts)*

|  | Six months ended June 30, 2009 | 2008 | % change | Primary reason(s) for significant change |
| --- | ---: | ---: | ---: | --- |
| Revenues | $912,214 | $1,312,010 | (30) | Lower fuel oil and purchased energy fuel costs, the effects of which are generally passed on to customers ($337 million), and lower KWH sales ($71 million), partially offset by higher DSM costs recovered through a surcharge ($2 million) |
| Expenses |  |  |  |  |
| Fuel oil | 277,174 | 523,298 | (47) | Lower fuel oil costs and less KWHs generated |
| Purchased power | 229,673 | 328,021 | (30) | Lower fuel costs and less KWHs purchased |
| Other operation | 125,578 | 115,001 | 9 | See “Results – six months ended June 30, 2009” below |
| Maintenance | 55,594 | 47,603 | 17 | See “Results – six months ended June 30, 2009” below |
| Depreciation | 72,849 | 70,835 | 3 | Additions to plant in service in 2008 |
| Taxes, other than income taxes | 87,710 | 119,857 | (27) | Decrease in revenues |
| Other | 404 | 1,016 | (60) |  |
| Operating income | 63,232 | 106,379 | (41) | Lower sales and higher other O&M and depreciation expenses |
| Net income for common stock | 29,627 | 52,017 | (43) | Lower operating income, partly offset by higher AFUDC |
| Kilowatthour sales (millions) | 4,631 | 4,885 | (5) | Slowing economy, customer conservation, cooler, less humid weather on Oahu and the effect of an additional leap year day in February 2008 |
| Cooling degree days (Oahu) | 2,003 | 2,249 | (11) |  |
| Average fuel oil cost per barrel | $55.19 | $99.29 | (44) |  |

Note: The electric utilities had an effective tax rate for the second quarters of 2009 and 2008 of 36% and 38%, respectively. The electric utilities had an effective tax rate for the first six months of 2009 and 2008 of 36% and 38%, respectively.

See “Economic conditions” in the “HEI Consolidated” section above.

***Results – three months ended June 30, 2009***. Operating income for the second quarter of 2009 decreased 42% from the same period in 2008 due primarily to lower sales and higher other operation and maintenance (O&M) expenses. For the second quarter of 2009, KWH sales were down 3.1% compared with the same quarter of 2008, primarily due to the soft economy, cooler weather and ongoing customer conservation.

“Other operation” expenses for the second quarter of 2009 increased by $3.8 million over the same period in 2008, primarily due to $1.6 million higher planned production and transmission and distribution operations expenses to maintain reliable operations and pursue renewable initiatives, higher DSM expenses (see “Demand-side management programs” below) that are generally passed on to customers through surcharges ($0.9 million) and $0.9 million higher bad debt expense. Maintenance expense increased $5.4 million primarily due to the greater scope of generating unit overhauls and higher expenses for substation maintenance, vegetation management and overhead and underground line maintenance.

The trend of increased O&M expenses is expected to continue as the electric utilities expect higher production expenses (primarily due to increased utilization of HECO’s generating assets commensurate with the level of demand that has occurred over the past five years), higher contract services costs, and higher transmission and distribution expenses to maintain system reliability. Also, additional expenses are expected to be incurred for the costs of CIP CT-1, for environmental compliance in response to more stringent regulatory requirements, and to execute the provisions of the Energy Agreement. Partly offsetting the anticipated increased costs are lower DSM expenses (that are generally passed on to customers through a surcharge) due to the transition of energy efficiency programs to a third-party administrator in July 2009.

Although peak demand moderated in 2008, generation reserve margins on Oahu continued to be strained. HECO has taken a number of steps to mitigate the risk of outages, including securing additional purchased power, adding DG at some substations, completing all utility requirements for system operation for CIP CT-1 on August 3, 2009 and encouraging energy conservation. The costs of supplying energy to meet high demand and the maintenance costs required to sustain high availability of the aging generating units have been increasing and the trend of increased costs is not likely to ease.

***Results – six months ended June 30, 2009***. Operating income for the first six months of 2009 decreased 41% from the same period in 2008 due primarily to lower sales and higher operation and maintenance (O&M) expenses. For the first six months of 2009, kilowatthour (KWH) sales were down 5.2% compared to the same period in 2008. The decline in sales is attributable to cooler, less humid weather, one less day of sales due to the leap year day in 2008, the soft economy and ongoing customer conservation.

“Other operation” expenses increased by $10.6 million in the first six months of 2009 compared to the same period in 2008, primarily due to higher DSM expenses (see “Demand-side management programs” below) that are generally passed on to customers through surcharges ($3.4 million), $3.4 million higher planned production and transmission and distribution operations expense to maintain reliable operations and pursue renewable initiatives; and $1.4 million higher bad debt expense. Maintenance expense increased $8.0 million, primarily due to the greater scope and number of generating unit overhauls and higher expenses for overhead and underground line maintenance, vegetation management and substation maintenance.

***Renewable energy strategy***. The electric utilities have been taking actions intended to protect Hawaii’s island ecology and counter global warming, while continuing to provide reliable power to customers, and recently committed to a number of related actions in the Energy Agreement. A three-pronged strategy supports attainment of the requirements and goals of the State of Hawaii Renewable Portfolio Standards (RPS), the Hawaii Global Warming Solutions Act of 2007 and the HCEI by: 1) the greening of existing assets, 2) the expansion of renewable energy generation and 3) the acceleration of energy efficiency and load management programs. Major initiatives are being pursued in each category, and additional ones have been committed to in the Energy Agreement.

In its June 30, 2009 filing with the PUC, HECO reported a consolidated RPS of 18% in 2008. This was accomplished through a combination of municipal solid waste, geothermal, wind, biomass, hydro, photovoltaic and biodiesel renewable generation resources; renewable energy displacement technologies; and energy savings from efficiency technologies.

The electric utilities are actively exploring the use of biofuels for existing and planned company-owned generating units. HECO has committed to using 100% biofuels for its new 110 MW generating unit planned for 2009. HECO is researching the possibility of switching its steam generating units from fossil fuels to biofuels, and in the Energy Agreement has committed to do so if economically and technically feasible and if adequate biofuels are available. In July 2009, HECO and MECO submitted separate applications with the PUC to approve biodiesel supply contracts for their respective biodiesel demonstration projects, and to include the biodiesel fuel costs and related costs in their respective energy cost adjustment clauses. HECO’s application also requested approval of capital project costs, but MECO’s estimated capital project costs were below the threshold that required separate PUC approval.

In January 2007, HECO and MECO agreed to form a venture with BlueEarth Biofuels LLC (BlueEarth) to develop a biodiesel production facility on MECO property on the island of Maui. BlueEarth Maui Biofuels LLC (BlueEarth Maui), a joint venture to pursue biodiesel development, was formed in early 2008 between BlueEarth and Uluwehiokama Biofuels Corp. (UBC), a non-regulated subsidiary of HECO. In February 2008, an Operating Agreement and an Investment Agreement were executed between BlueEarth and UBC, under which UBC invested $400,000 in BlueEarth Maui in exchange for a minority ownership interest. MECO began negotiating with

BlueEarth Maui for a fuel purchase contract for biodiesel to be used in existing diesel-fired units at MECO’s Maalaea plant. However, negotiations for the biodiesel supply contract stalled based on an inability to reach agreement on various financial and risk allocation issues. In October 2008, BlueEarth filed a civil action in federal district court in Texas against MECO, HECO and others alleging claims based on the parties’ failure to have reached agreement on the biodiesel supply and related land agreements. The lawsuit seeks damages and equitable relief. In April 2009, the venue of the action was transferred to Hawaii. A trial date has been scheduled for June 2010. Work on the project was suspended because the litigation was filed. The Memorandum of Understanding (MOU) between HECO, MECO and BlueEarth regarding the project has also expired. Although HECO remains committed to supporting development of renewable fuels production, because of the filing of the litigation, the expiration of the MOU, and other factors, HECO and MECO now consider the project terminated.

The electric utilities also support renewable energy through their solar water heating and heat pump programs, and the negotiation and execution of purchased power contracts with non-utility generators using renewable sources (e.g., refuse-fired, geothermal, hydroelectric, photovoltaic and wind turbine generating systems). In November 2007, HECO entered into a contract with Hoku Solar, Inc. to purchase energy from a photovoltaic system with a generating capacity of up to 300 kilowatts (kW) to be located at HECO’s Archer Substation. The PUC approved the contract in May 2008, and Hoku Solar is seeking financing for the project. In October 2008, the PUC approved a power purchase contract between MECO and Lanai Sustainability Research, LLC for the purchase of up to 1.2 MW of electricity from a photovoltaic system owned by Lanai Sustainability Research, LLC, which was placed in service in December 2008. In December 2008, the PUC approved a power purchase contract between HELCO and Keahole Solar Power LLC (a wholly-owned subsidiary of Sopogy, Inc.) for the purchase of energy from a 500 kW concentrated solar power facility, which is now being installed. In March 2009, HECO and HELCO filed an executed term sheet with the PUC for a power purchase contract with Hu Honua Bioenergy, LLC, which intends to refurbish a biomass plant located on the island of Hawaii. In July 2009, HECO executed a purchase power agreement with Kahuku Wind Power, LLC, subject to PUC approval, to purchase 30 MW of electricity from a wind turbine generating system.

On April 30, 2009, HECO filed an application with the PUC for approval of a Photovoltaic (PV) Host Pilot Program. If approved, this will be a two-year pilot program whereby HECO, HELCO and MECO would lease rooftops or other space from property owners, with a focus on governmental facilities, for third-party owned photovoltaic systems. The PV developer would own, operate and maintain the system and sell the energy to the utilities at a fixed rate under a long term contract.

In September 2007, HECO issued a Solicitation of Interest for its planned Renewable Energy Request for Proposals (RFP) for combined renewable energy projects up to 100 MW on Oahu. In June 2008, the PUC approved HECO’s Oahu Renewable Energy RFP and HECO issued the RFP shortly thereafter. HECO received bids representing a variety of renewable technologies and a short list of bids proceeding to the Interconnection Requirements Study phase has been identified. Interconnection requirements studies are underway. Included in the bids received were proposals for large scale neighbor island wind projects. In accordance with the Energy Agreement, the proposals for large scale neighbor island wind projects (Big Wind projects) were bifurcated from the Oahu Renewable Energy RFP. The utilities intend to separately negotiate purchase power agreements with two neighbor island wind projects that would produce energy to be imported to Oahu via a yet-to-be-built undersea transmission cable system.

On July 17, 2009, HECO filed an application requesting approval to (1) to defer the costs of outside services incurred in 2009 and 2010 to conduct the studies and analyses necessary (a) to reliably and effectively integrate large amounts of wind-generated renewable energy potentially located on the islands of Molokai and Lanai to the Oahu electric grid, and (b) to assess the potential routes and permitting requirements for the Oahu transmission lines and facilities necessary to interconnect undersea cables delivering power from the Big Wind Projects to Oahu; and (2) to recover the expenses for these “Big Wind Implementation Studies” through a surcharge mechanism. The specific approvals requested included approvals (1) to defer the costs for outside services (estimated at $6.3 million) for the Big Wind Implementation Studies that are expected to be incurred from January 1, 2009 through 2010, and that would otherwise be expensed; and (2) to recover the revenue requirements of those deferred costs through the Renewable Energy Infrastructure Program/Clean Energy Infrastructure Surcharge (REIP/CEI Surcharge) that is pending approval or, in the alternative, through a Big Wind Project-specific surcharge (Big Wind Surcharge) mechanism that the PUC would approve in this proceeding. If the PUC does not approve recovery of the Big Wind Implementation Studies expenses through a surcharge mechanism, HECO requested PUC approval (1) to defer the Big Wind Implementation Studies costs beginning January 1, 2009 until its next rate case, (2) to amortize the deferred costs over a three-year period beginning when rates established in the next rate case that reflect the amortization become effective, (3) to include the annual amortization expense in determining the revenue requirements in that next rate case, and (4) to include the unamortized balance of the deferred costs in rate base to determine HECO’s revenue requirement.

HECO’s unregulated subsidiary, Renewable Hawaii, Inc. (RHI), was established to stimulate renewable energy initiatives by prospecting for new projects and sites and taking a passive, minority interest in selected third-party renewable energy projects. Beginning in 2003, RHI actively pursued a number of projects, particularly those utilizing wind, landfill gas, and ocean energy. While RHI has executed some memoranda of understanding and conditional investment agreements with project developers, no investments have been made to date. Due to the active renewable energy marketplace in Hawaii, RHI is not seeking new projects at this time.

The electric utilities promote research and development in the areas supporting renewable energy such as biofuels, ocean energy, battery storage, smart grids, and integration of non-firm power into the separate island electric grids.

Energy efficiency and DSM programs for commercial and industrial customers, and residential customers, including load control programs, have resulted in reducing system peak load and contribute to the achievement of the RPS. Since the inception of the energy efficiency and DSM programs in 1996 and through the end of 2008, the total system peak load has been reduced by 163 MW (143 MW at HECO, 8 MW at HELCO, and 12 MW at MECO) at the gross generation level and net of estimated reductions from participants who would have installed the DSM measure without the program and rebate.

For a description of some of the major provisions of the Energy Agreement most directly affecting HECO and its subsidiaries and their commitments relating to renewable energy and energy efficiency, see “Hawaii Clean Energy Initiative” in Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

Also, see “Renewable Portfolio Standard” under “Legislation and regulation” below.

***Competition***. Although competition in the generation sector in Hawaii has been moderated by the scarcity of generation sites, various permitting processes and lack of interconnections to other electric utilities, HECO and its subsidiaries face competition from IPPs and customer self-generation, with or without cogeneration.

In 1996, the PUC issued an order instituting a proceeding to identify and examine the issues surrounding electric competition and to determine the impact of competition on the electric utility infrastructure in Hawaii. In October 2003, the PUC opened investigative proceedings on two specific issues (competitive bidding and DG) to move toward a more competitive electric industry environment under cost-based regulation. For a description of some of the regulatory changes that will be pursued as part of the Energy Agreement, see “Hawaii Clean Energy Initiative” in Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

Competitive bidding proceeding. The stated purpose of this proceeding, commenced in 2003, was to evaluate competitive bidding as a mechanism for acquiring or building new generating capacity in Hawaii. In December 2006, the PUC issued a decision that included a final competitive bidding framework, which became effective immediately. The final framework states, among other things, that under the framework: (1) a utility is required to use competitive bidding to acquire a future generation resource or a block of generation resources unless the PUC finds bidding to be unsuitable; (2) the determination of whether to use competitive bidding for a future generation resource or a block of generation resources will be made by the PUC during its review of the utility’s IRP; (3) the framework does not apply to three pending projects, specifically identified offers to sell energy on an as-available basis or to sell firm energy and/or capacity by non-fossil fuel producers and certain other situations identified in the framework; (4) waivers from competitive bidding for certain circumstances will be considered by the PUC; (5) for each project that is subject to competitive bidding, the utility is required to submit a report on the cost of parallel planning upon the PUC’s request; (6) the utility is required to consider the effects on competitive bidding of not allowing bidders access to utility-owned or controlled sites, and to present reasons to the PUC for not allowing site access to bidders when the utility has not chosen to offer a site to a third party; (7) the utility is required to select an independent observer from a list approved by the PUC whenever the utility or its affiliate seeks to advance a project proposal (i.e., in competition with those offered by bidders); (8) the utility may consider its own self-bid proposals in response to generation needs identified in its RFP; (9) the evaluation of the utility’s bid should account for the possibility that the capital or running costs actually incurred, and recovered from ratepayers, over the plant’s lifetime, will vary from the levels assumed in the utility’s bid; and (10) for any resource to which competitive bidding does not apply (due to waiver or exemption), the utility retains its traditional obligation to offer to purchase capacity and energy from a Qualifying Facility (QF) at avoided cost upon reasonable terms and conditions approved by the PUC.

In 2007, the PUC approved the utilities’ tariffs containing procedures for interconnection and transmission upgrades, a list of qualified candidates for the Independent Observer position for future competitive bidding processes and a Code of Conduct.

In June 2008, HECO issued a RFP, which seeks proposals for the supply of up to approximately 100 MW of long-term renewable energy for the island of Oahu under a PPA. Bids were received in September 2008 and a short list of bidders was identified in December 2008. Further discussions with the short listed bidders have begun and an interconnection requirements study has commenced. The RFP schedule provides for selection of an Award Group in August 2009 and submittal of PPAs for PUC approval by December 2009. The Energy Agreement recognized that the Oahu Renewable Energy RFP provides an excellent near-term opportunity to add new clean renewable energy sources on Oahu and included the anticipated up to 100 MW of renewable energy from these project proposals in its goals. See “Renewable energy strategy” above for a discussion on the bifurcation of the large-scale neighbor island wind project proposals from the other proposals received in response to the Oahu Renewable Energy RFP.

In December 2007, in response to MECO’s request for approval to proceed with a competitive bidding process to acquire two separate increments of approximately 20 MW to 25 MW of firm generating capacity on the island of Maui in the 2011 and 2015 timeframes, the PUC opened a new docket related to MECO’s proposed RFP, identified MECO and the Consumer Advocate as parties to the docket and approved MECO’s contract with the Independent Observer for the proposed RFP. The schedule for competitive bidding for the first capacity increment (recently targeted for 2015) anticipated the issuance of a draft RFP in 2010. MECO, however, is currently evaluating the projected need date for firm capacity. As a result, the timing for the planned competitive bidding effort is currently also under review.

In May 2008, the PUC issued a D&O stating that PGV’s proposal to modify its existing PPA with HELCO to provide an additional 8 MW of firm capacity by expanding its existing facility is exempt from the Competitive Bidding Framework, and negotiations to modify that PPA are currently ongoing. In the third quarter of 2008, the PUC granted requests for waivers from the Competitive Bidding Framework for four projects (at HELCO—one biomass, a wind/hydroelectric and a wind/battery energy storage, and at MECO—one biomass), subject to the submittal of a fully executed term sheet within four months of the decision granting the waiver, and documentation showing the fairness of the price being included in the application for approval of a PPA. In the fourth quarter 2008, the PUC granted a request for waiver from the Competitive Bidding Framework for another biomass project on the island of Hawaii, subject to the same conditions as the four previous waivers. The waivers granted in the third quarter of 2008 expired in December 2008 and January 2009 due to the inability of the parties to reach agreement on term sheets. As an alternative to submitting fully executed term sheets for the wind/hydroelectric and wind/battery energy storage projects on the Island of Hawaii, HECO and HELCO informed the PUC that they will be proposing a competitive bidding process to acquire renewable generation on the island of Hawaii. In February 2009, HELCO submitted preliminary plans and timeline for the proposed competitive bidding process and advised the PUC that adjustments may be considered to include firm dispatchable and/or schedulable resources depending on the status of the remaining waivered biomass project. In March 2009, HELCO reached agreement on a term sheet with the remaining waivered biomass project. In April 2009, HELCO retained an Independent Engineering consultant to evaluate the suitability of the current generation system conditions for issuing an RFP for acquiring additional renewable resources. In June 2009, the Independent Engineer submitted a preliminary draft of their recommendations, which is currently being reviewed by HELCO.

In September 2008, HECO submitted fully executed term sheets for the following three renewable energy projects on Oahu that were “grandfathered” from the competitive bidding process: a Honua Power steam turbine generator, a Kahuku Wind Power wind farm, and a Sea Solar Power International ocean thermal energy conversion project. In October 2008, timelines for the completion and execution of the power purchase contracts and the planned in-service dates for these three projects were submitted to the PUC. In May 2009, HECO submitted to the PUC an update to the October 2008 filing on the status of negotiations with Honua Power, Kahuku Wind Power and Sea Solar Power International. HECO and Kahuku Wind Power signed a PPA in July 2009, subject to PUC approval. Certain appendices of the PPA will be revised to reflect completion and mutual acceptance of the results of the interconnection requirements study, which is ongoing. Negotiations to reach a PPA with Honua Power and Sea Solar Power International are currently ongoing.

Management cannot currently predict the ultimate effect of these developments on the ability of the utilities to acquire or build additional generating capacity in the future.

DG proceeding. In October 2003, the PUC opened a DG proceeding to determine DG’s potential benefits to and impact on Hawaii’s electric distribution systems and markets and to develop policies and a framework for DG projects deployed in Hawaii.

In January 2006, the PUC issued its D&O indicating that its policy is to promote the development of a market structure that assures DG is available at the lowest feasible cost, DG that is economical and reliable has an opportunity to come to fruition and DG that is not cost-effective does not enter the system. The D&O affirmed the ability of the utilities to procure and operate DG for utility purposes at utility sites. The PUC also indicated its desire to promote the development of a competitive market for customer-sited DG. The PUC found that the “disadvantages outweigh the advantages” of allowing a utility to provide DG services on a customer’s site. However, the PUC also found that the utility “is the most informed potential provider of DG” and it would not be in the public interest to exclude the utilities from providing DG services at this early stage of DG market development. Therefore, the D&O allows the utility to provide DG services on a customer-owned site as a regulated service when (1) the DG resolves a legitimate system need, (2) the DG is the lowest cost alternative to meet that need, and (3) it can be shown that, in an open and competitive process acceptable to the PUC, the customer operator was unable to find another entity ready and able to supply the proposed DG service at a price and quality comparable to the utility’s offering.

The January 2006 D&O also required the utilities to file tariffs and establish standby rates based on unbundled costs associated with providing each service (i.e., generation, distribution, transmission and ancillary services). The utilities filed their proposed modifications to existing DG interconnection tariffs and their proposed unbundled standby rates for PUC approval in the third quarter of 2006. The Consumer Advocate stated that it did not object to implementation of the interconnection and standby rate tariffs at that time, but reserved the right to review the reasonableness of both tariffs in rate proceedings for each of the utilities. See “Distributed generation tariff proceeding” below.

In April 2006, the PUC provided clarification to the conditions under which the utilities are allowed to provide regulated DG services (e.g., the utilities can use a portfolio perspective—a DG project aggregated with other DG systems and other supply-side and demand-side options—to support a finding that utility-owned, customer-sited DG projects fulfill a legitimate system need, and the economic standard of “least cost” in the order means “lowest reasonable cost” consistent with the standard in the IRP framework). The PUC also affirmed that the electric utility has the responsibility to demonstrate that it meets all applicable criteria included in the D&O in its application for PUC approval to proceed with a specific DG project.

The utilities are developing or evaluating potential DG projects. In September 2008, HECO executed an agreement with the State of Hawaii Department of Transportation to develop a dispatchable standby generation (DSG) facility at the Honolulu Airport that will be owned by the State and operated by HECO. The D&O encouraged HECO to pursue such DG operating arrangements with customers. HECO filed an application to the PUC for approval of the agreement in December 2008.

By a D&O issued in June 2009, the PUC approved the agreement for the DSG facility at the Honolulu International Airport. The PUC also approved HECO’s request to waive the project from the Competitive Bidding Framework and HECO’s commitment of funds. However, the PUC denied HECO’s proposed accounting and ratemaking treatment for capital and overhaul reimbursement payments to be made by HECO to the Department of Transportation under the terms of the agreement. HECO will work with the Department of Transportation to restructure the agreement to provide HECO with the ability to seek cost recovery for these expenses in accordance with the PUC D&O.

HECO is also evaluating the potential to develop utility-owned DG at Oahu military bases, in a manner consistent with the D&O, in order to meet utility system needs and the energy objectives of the DOD. In 2009, HECO will conduct a feasibility review of extending the use of temporary DG units that were installed at various HECO substations in 2005 to 2007 and converting them to run on biodiesel.

In February 2008, MECO received PUC approval of an agreement for the installation of a CHP system at a hotel site on the island of Lanai. The CHP system is being installed and is planned to be in service in the third quarter of 2009.

Distributed generation tariff proceeding. In December 2006, the PUC opened a new proceeding to investigate the utilities’ proposed DG interconnection tariff modifications and standby rate tariffs. In March 2008, the parties to the proceeding filed a settlement agreement with the PUC proposing that a standby service tariff agreed to by the parties should be approved. The interconnection tariffs, with modifications made in response to the PUC’s information requests, were approved in April 2008. In May 2008, the PUC approved the settlement agreement on the standby service tariff.

In September 2008, the PUC requested that the utilities address various inconsistencies in the interconnection tariff sheets. In the fourth quarter of 2008, the utilities filed revised interconnection tariff sheets and the PUC issued an order approving the revised interconnection tariff sheets and closing the DG tariff proceeding.

As required in the Energy Agreement, the utilities conducted a review of the modified DG interconnection tariffs to evaluate whether the tariffs are effective in supporting non-utility DG and distributed energy storage by improving the process and procedure for interconnection. HECO filed its evaluation report to the PUC in June 2009, concluding that the process has been working efficiently. Several minor modifications to clarify portions of the tariff were identified. A request to modify the DG interconnection tariff will be filed with the PUC later in 2009.

DG and distributed energy storage under the Energy Agreement. Under the Energy Agreement, the utilities committed to facilitate planning for distributed energy resources through a new Clean Energy Scenario Planning process. Under this process, Locational Value Maps will be developed by December 31, 2009 to identify areas where DG and distributed energy storage would provide utility system benefits and can be reasonably accommodated.

The utilities also agreed to power utility-owned DG using sustainable biofuels or other renewable technologies and fuels, and to support either customer-owned or utility-owned distributed energy storage.

The parties to the Energy Agreement support reconsideration of the PUC’s restrictions on utility-owned DG where it is proven that utility ownership and dispatch clearly benefits grid reliability and ratepayer interests, and the equipment is competitively procured. The parties also support HECO’s dispatchable standby generation units upon showing reasonable ratepayer benefits.

The utilities may contract with third parties to aggregate fleets of DG or standby generators for utility dispatch or under PPAs, or may undertake such aggregation themselves if no third parties respond to a solicitation for such services.

The Energy Agreement also provides that to the degree that transmission and distribution automation and other smart grid technology investments are needed to facilitate distributed energy resource utilization, those investments will be recovered through a Clean Energy Infrastructure Surcharge and later placed in rate base in the next rate case proceeding.

***Most recent rate requests***. The electric utilities initiate PUC proceedings from time to time to request electric rate increases to cover rising operating costs and the cost of plant and equipment, including the cost of new capital projects to maintain and improve service reliability. The PUC may grant an interim increase within 10 to 11 months following the filing of the application, but there is no guarantee of such an interim increase or its amount and interim amounts collected are refundable, with interest, to the extent they exceed the amount approved in the PUC’s final D&O. The timing and amount of any final increase is determined at the discretion of the PUC. The adoption of revenue, expense, rate base and cost of capital amounts (including the return on average common equity (ROACE) and return on rate base (ROR)) for purposes of an interim rate increase does not commit the PUC to accept any such amounts in its final D&O.

As of August 3, 2009, the return on average common equity (ROACE) found by the PUC to be reasonable in the most recent final rate decision for each utility was 10.7% for HECO (D&O issued on May 1, 2008, based on a 2005 test year), 11.5% for HELCO (D&O issued on February 8, 2001, based on a 2000 test year) and 10.94% for MECO (amended D&O issued on April 6, 1999, based on a 1999 test year). The ROACEs used by the PUC in the interim rate increases in HECO, HELCO and MECO rate cases based on 2009, 2006 and 2007 test years issued in August 2009, April 2007 and December 2007, were 10.5%, 10.7% and 10.7% respectively.

For the 12 months ended June 30, 2009, the actual ROACEs (calculated under the rate-making method, which excludes the effects of items not included in determining electric utility rates, and reported to the PUC) for HECO, HELCO and MECO were 6.40%, 6.77% and 5.22%, respectively. HECO’s actual ROACE was 410 basis points lower than its interim D&O ROACE primarily due to lower KWH sales and increased O&M expenses, which are expected to continue. HELCO and MECO’s actual ROACEs were 393 and 548 basis points, respectively, lower than their interim D&O ROACEs due in part to lower KWH sales.

As of August 3, 2009, the return on rate base (ROR) found by the PUC to be reasonable in the most recent final rate decision for each utility was 8.66% for HECO, 9.14% for HELCO and 8.83% for MECO (D&Os noted above). The RORs used by the PUC for purposes of the interim D&Os in the HECO, HELCO and MECO rate cases based on 2009, 2006 and 2007 test years were 8.45%, 8.33% and 8.67%, respectively. For the 12 months ended June 30, 2009, the actual RORs (calculated under the rate-making method, which excludes the effects of items not included in determining electric utility rates, and reported to the PUC) for HECO, HELCO and MECO were 5.61%, 4.87% and 5.21%, respectively.

In 2009, HECO, and in 2007, HELCO and MECO received interim D&Os, which included the reclassification to a regulatory asset of the charge for retirement benefits that would otherwise be recorded in accumulated other comprehensive income (AOCI).

For a description of some of the rate-making changes that the parties have agreed to pursue under the Energy Agreement, see “Hawaii Clean Energy Initiative” in Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

HECO.

*2005 test year rate case.* In November 2004, HECO filed a request with the PUC to increase base rates, based on a 2005 test year, a 9.11% ROR and an 11.5% ROACE. Disregarding an amount included in the request to transfer the cost of existing DSM programs from a surcharge line item on electric bills into base electricity charges, which issue was bifurcated for consideration in another proceeding, the requested base rates increase was $74 million, or 7.3%.

In September 2005, HECO, the Consumer Advocate and the DOD reached agreement (subject to PUC approval) on most of the issues in the rate case proceeding. The significant issue not resolved among the parties was the appropriateness of including in rate base approximately $50 million related to HECO’s prepaid pension asset, net of deferred income taxes.

Later in September 2005, the PUC issued its interim D&O, authorizing an increase of $53 million ($41 million net additional revenues). For purposes of the interim D&O, the PUC included HECO’s prepaid pension asset in rate base (with an annual rate increase impact of approximately $7 million).

On October 25, 2007, the PUC issued an amended proposed final D&O, authorizing a net increase of 2.7%, or $34 million, in annual revenues, based on a 10.7% ROACE (and an 8.66% ROR on a rate base of $1.060 billion). The amended proposed final D&O, which was issued in final form with certain modifications (as described below), reversed the portion of the interim D&O related to the inclusion of HECO’s approximately $50 million pension asset, net of deferred income taxes, in rate base, and required a refund of revenues associated with that reversal, including interest, retroactive to September 28, 2005 (the date the interim increase became effective).

On May 1, 2008, the PUC issued the final D&O for HECO’s 2005 test year rate case, which was consistent with a stipulated revised results of operations filed by the parties on March 28, 2008, and authorized an increase of $45 million in annual revenues ($34 million net) based on a 10.7% ROACE (and an 8.66% ROR on a rate base of $1.060 billion). In the final D&O, the PUC accepted the parties’ position that the review of the ECAC under Act 162 (Hawaii Revised Statutes §269-16(g)) should not be required in this case, but would be made in HECO’s 2007 test year rate case.

Following the issuance of the final D&O, the required refund, with interest, to customers was completed in August 2008. On October 2, 2008, HECO filed with the PUC its 2005 test year rate case refund reconciliation, which reflected that $1.4 million was over-refunded. On October 28, 2008, the PUC issued a letter stating that HECO was not authorized to collect the over-refunded amount and HECO reduced its revenues for the third quarter of 2008 by $1.4 million.

*2007 test year rate case.* On December 22, 2006, HECO filed a request with the PUC for a general rate increase of $99.6 million, or 7.1% over the electric rates currently in effect (i.e., over rates that included the interim rate increase discussed above of $53 million ($41 million net additional revenues) granted by the PUC in September 2005), based on a 2007 test year, an 8.92% ROR, an 11.25% ROACE and a $1.214 billion average rate base. This rate case excluded DSM surcharge revenues and associated incremental DSM costs because certain DSM issues, including cost recovery, were being addressed in another proceeding.

HECO’s 2006 application included a proposed new tiered rate structure for residential customers to reward customers who practice energy conservation with lower electric rates for lower monthly usage. The proposed rate increase includes costs incurred to maintain and improve reliability, such as the new Dispatch Center building and associated equipment and the Energy Management System that became operational in 2006, new substations, a new outage management system (added in 2007) and increased O&M expenses.

The application addressed the energy cost adjustment clause (ECAC) provisions of Act 162 and requested the continuation of HECO’s ECAC. On December 29, 2006, the electric utilities’ Report on Power Cost Adjustments and Hedging Fuel Risks (ECAC Report) prepared by their consultant, National Economic Research Associates, Inc., was filed with the PUC. The testimonies filed in the latest rate cases for HECO, HELCO and MECO included or incorporated the ECAC Report, which concluded that (1) the electric utilities’ ECACs are well-designed, and benefit the electric utilities and their ratepayers and (2) the ECACs comply with the statutory requirements of Act 162. With respect to hedging, the consultants concluded that (1) hedging of oil prices by HECO would not be expected to reduce fuel and purchased power costs and in fact would be expected to increase the level of such costs and (2) even if rate smoothing is a desired goal, there may be more effective means of meeting the goal, and there is no compelling reason for the electric utilities to use fuel price hedging as the means of achieving the objective of increased rate stability.

HECO’s application requested a return on HECO’s pension assets (i.e., accumulated contributions in excess of accumulated net periodic pension costs) by including such assets (net of deferred taxes) in rate base. In a separate AOCI proceeding, the electric utilities had earlier requested PUC approval to record as a regulatory asset for financial reporting purposes, the amounts that would otherwise be charged to AOCI in stockholders’ equity as a result of adopting SFAS No. 158, but that request was denied. HECO thus proposed in the 2007 test year rate case to restore to book equity for ratemaking purposes the amounts charged to AOCI as a result of adopting SFAS No. 158. The authorized ROACE found to be fair in a rate case is applied to the equity balance in determining the utility’s weighted cost of capital, which is the rate of return applied to the rate base in determining the utility’s revenue requirements. HECO’s position was that, if the reduction in equity balance resulting from the AOCI charges is not restored for ratemaking purposes, a higher ROACE will be required.

In March 2007, a public hearing on the rate case was held. In April 2007, the PUC granted the DOD’s motion to intervene.

In a June 2007 update to its direct testimonies, HECO proposed pension and OPEB tracking mechanisms, similar to the mechanisms that were agreed to by HELCO and the Consumer Advocate and approved on an interim basis by the PUC in the HELCO 2006 test year rate case (discussed below). A pension funding study (required by the PUC in the AOCI proceeding) was filed in the HECO rate case in May 2007. The conclusions in the study were consistent with the funding practice proposed with the pension tracking mechanism. For a discussion of this mechanism and related pension issues, see Note 4, “Retirement Benefits” of HECO’s “Notes to Consolidated Financial Statements.”

On September 6, 2007, HECO, the Consumer Advocate and the DOD (the parties) executed and filed an agreement on most of the issues in HECO’s 2007 test year rate case and HECO submitted a statement of probable entitlement with the PUC. The agreement was subject to approval by the PUC.

The amount of the revenue increase based on the stipulated agreement was $70 million annually, or a 4.96% increase over current effective rates at the time of the stipulation. The settlement agreement included, as a negotiated compromise of the parties’ respective positions, an ROACE of 10.7% (and an 8.62% ROR and a $1.158 billion average rate base) to determine revenue requirements in the proceeding. In the settlement agreement, the parties agreed that the final rates set in HECO’s 2005 test year rate case may impact revenues at current effective rates and at present rates, and indicated that the amount of the stipulated interim rate increase in this case would be adjusted to take into account any such changes. For purposes of the settlement, the parties agreed to a pension tracking mechanism that does not include amortization of HECO’s pension asset (comprised of accumulated contributions to its pension plan in excess of net periodic pension cost and amounting to $68 million at December 31, 2006) as part of the pension tracking mechanism in the proceeding. (This has the effect of deferring the issue of whether the pension asset should be amortized for rate making purposes to HECO’s next rate case.)

In accordance with Act 162, the PUC, by an order issued August 24, 2007, had added as an issue to be addressed in the rate case whether HECO’s ECAC complies with the requirements of Act 162. In the settlement agreement, the parties agreed that the ECAC should continue in its present form for purposes of an interim rate increase and stated that they are continuing discussions with respect to the final design of the ECAC to be proposed for approval in the final D&O. The parties agreed to file proposed findings of fact and conclusions of law on all issues in this proceeding, including the ECAC. The parties agreed that their resolution of the ECAC issue would not affect their agreement regarding revenue requirements in the proceeding.

On October 22, 2007, the PUC issued, and HECO implemented, an interim D&O granting HECO an increase of $70 million in annual revenues over rates effective at the time of the interim D&O, subject to refund with interest. The interim increase was based on the settlement agreement described above and did not include in rate base the HECO pension asset. The interim D&O also approved, on an interim basis, the adoption of the pension tracking mechanism and a tracking mechanism for OPEB. See “Interim increases” in Note 5 and Note 4, “Retirement benefits,” of HECO’s “Notes to Consolidated Financial Statements.”

On May 1, 2008, the PUC issued the final D&O for HECO’s 2005 test year rate case, which was consistent with the stipulated revised results of operations filed by the parties on March 28, 2008. Consistent with the previous settlement agreement with the parties in this case, HECO filed a motion with the PUC in May 2008 to adjust the amount of the annual interim increase in this proceeding from $70 million to $77.9 million to take into account the changes in current effective rates as a result of the final decision in the 2005 test year rate case, and to have the change be effective at the same time the tariff sheets reflecting the final decision in the 2005 rate case become effective. In June 2008, the PUC approved HECO’s motion. On September 30, 2008, HECO filed a correction with the PUC to adjust the amount of the annual interim increase for the 2007 test year rate case from $77.9 million to $77.5 million and filed tariff sheets to be effective October 1 through 31, 2008 to refund $0.1 million over-collected from June 20 to September 30, 2008.

On December 30, 2008, HECO and the Consumer Advocate filed a joint set of proposed findings of fact and conclusions of law and HECO requested that the PUC approve the final rate increase of $77.5 million.

Management cannot predict the timing, or the ultimate outcome, of a final D&O in HECO’s 2007 test year rate case.

*2009 test year rate case.* On July 3, 2008, HECO filed a request for a general rate increase of $97 million or 5.2% over the electric rates currently in effect (i.e., over rates that included the interim rate increase discussed above granted by the PUC in HECO’s 2007 test year rate case, which amount is $77 million based on the effects of the final decision in HECO’s 2005 test year rate case), based on a 2009 test year, an 8.81% ROR, an 11.25% ROACE, and a $1.408 billion rate base. HECO’s application requested an interim increase of $73 million on or before the statutory deadline for interim rate relief and a step increase of $24 million based on the return on the annualized net investment of the new CIP CT-1 and recovery of associated expenses to be effective at the in-service date of the new unit.

The requested rate increase was based on anticipated plant additions estimated at the time of filing of $375 million in 2008 and 2009 (including the new CIP CT-1 and related transmission line) to maintain and improve system reliability, higher operation and maintenance costs required for HECO’s electrical system, and higher depreciation expenses since the last rate case. To the extent actual project costs are higher than the estimate included in the requested rate increase (e.g., higher costs for the CIP CT-1 and transmission line), HECO plans to seek recovery in a future proceeding. As in its 2007 test year rate case, HECO requests continuation of its ECAC in its present form. The request excludes incremental DSM costs from the test year revenue requirement due to the transition of HECO’s DSM programs to a third-party program administrator in 2009 as ordered by the PUC.

In August 2008, the PUC granted the DOD’s motion to intervene in the rate case proceeding. In September 2008, the PUC held a public hearing on HECO’s rate increase application.

In the Energy Agreement, the parties agree to seek approval from the PUC to implement in the interim D&O in the 2009 HECO rate case a decoupling mechanism (see Decoupling proceeding below). HECO filed updates to its 2009 test year rate case in November and December 2008, which proposed to establish a revenue balancing account for a decoupling mechanism and a purchased power adjustment clause. As discussed below, the PUC in its interim D&O did not approve the proposal to establish an RBA to be effective as of the date of the interim D&O, pending the outcome of the decoupling proceeding. Also, the PUC asked for more information on the power purchase adjustment clause and HECO provided additional support for the reasonableness of the surcharge in the supplemental testimonies filed on July 20, 2009.

In March 2009, HECO agreed to remove certain costs and expenses from the rate case, including unamortized system development costs related to replacement of its customer information system due to a delay in transitioning to the new system. See Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

In April 2009, the Consumer Advocate and the DOD filed their direct testimonies in this proceeding. The Consumer Advocate recommended a revenue increase of $62.7 million based on its proposed ROR of 7.86%, an ROACE ranging between 9.5% and 10.5% and a proposed average rate base of $1.259 billion. The Consumer Advocate recommended an average rate base treatment for the CIP CT-1, rather than accept the Company’s proposal for a step increase based on the annualized net cost of the CIP CT-1 which would go into effect on the in-service date of the new unit. In its recommendations, the Consumer Advocate also removed the costs and expenses identified by HECO in March 2009 relating to the replacement of HECO’s customer information system. The DOD recommended a revenue increase of $45.1 million based on its proposed ROR of 7.85%, an ROACE of 9.50% and a proposed average rate base of $1.309 billion. The DOD also recommended an average rate base treatment for the CIP CT-1 and in its recommendations has removed the costs and expenses identified by HECO in March 2009 relating to the replacement of HECO’s customer information system.

On May 15, 2009, HECO, the Consumer Advocate and the DOD (the parties) executed and filed an agreement on most of the issues in HECO’s 2009 test year rate case proceeding. The settlement agreement included an interim increase amounting to $79.8 million annually, or a 6.2% increase. The settlement agreement represented a negotiated compromise of the parties’ respective positions and was approximately 18% lower than HECO’s original request for a $97 million increase in revenues. For purposes of the interim decision only, the parties agreed upon a ROACE of 10.50%. The settlement agreement reflected the average rate base treatment for the CIP CT-1 rather than HECO’s proposal for a step increase based on the annualized net cost of CIP CT-1. As part of the settlement, the parties also agreed that the PUC should allow HECO to establish an RBA, which would remove the linkage between electric revenues and KWH sales, to be effective on the date of the interim D&O. If approved, the RBA would have provided a mechanism to adjust revenues (increases/decreases) subsequent to the interim D&O for the differences (shortages/overages) between the actual revenues and the revenues determined in the interim D&O.

The remaining issues among the parties impacting the amount of the increase for the proceeding related to the appropriate test year expense amount for informational advertising, and the appropriate ROACE for the test year. HECO believes its test year estimate for informational advertising and a ROACE of 11%, assuming the approval of a revenue adjustment mechanism, is reasonable. If HECO prevails on the remaining issues, the additional annual revenue increase would be approximately $7 million more than agreed upon in the settlement agreement.

On May 19, 2009, based on the understandings reached in the settlement agreement, HECO submitted its statement of probable entitlement, requesting an interim increase of $79.8 million, based on an 8.45% return on average rate base of $1.253 billion.

On July 2, 2009, the PUC issued an interim D&O in HECO’s 2009 test year rate case proceeding. The interim D&O approved a rate increase for interim purposes, but directed that adjustments be made to reduce the increase reflected in HECO’s statement of probable entitlement for several items, including certain labor expenses, and the costs related to CIP CT-1. Part of the labor expense reduction relates to new positions established to carry out initiatives included in the HCEI. The PUC removed certain costs related to HCEI, because those initiatives are still the subject of pending PUC proceedings and have not yet been approved. The PUC removed the costs related to CIP CT-1 from rate base indicating that the record did not yet demonstrate that the CIP CT-1 unit would be in service by the end of the 2009 test year. The PUC did not approve the proposal to establish an RBA to be effective as of the date of the interim D&O, pending the outcome of the decoupling proceeding.

Based on the adjustments, HECO calculated the interim increase amount at $61.1 million annually or a 4.7% increase (compared to $79.8 million, or a 6.2% increase, agreed to by the parties under the settlement agreement) and submitted the information to the PUC on July 8, 2009. The interim increase amount is based on a return on average common equity of 10.50% agreed to by the parties for purposes of the interim decision only, and an 8.45% return on average rate base of $1.169 billion (compared to the average rate base of $1.253 billion agreed to by the parties in their settlement agreement).

On July 15, 2009, in responding to HECO’s calculations, the Consumer Advocate stated that HECO’s proposed adjustments were conservatively prepared, that HECO’s revised schedules were in general compliance with the PUC’s interim D&O, and that it did not object to HECO’s filing. The Consumer Advocate also identified Hawaii Clean Energy Initiative (HCEI)-related costs of $1.5 million that were included in the settlement agreement and HECO’s statement of probable entitlement that it believed could be subject to interpretation as to whether they should be included in the interim rate relief under the D&O. HECO filed a response providing an explanation supporting the inclusion of these costs in its original interim increase calculations. The DOD did not file any comments on HECO’s interim increase calculations. The interim decision was implemented on August 3, 2009. If the amounts collected pursuant to an interim decision exceed the amount of the increase ultimately approved in the final D&O, then the excess would have to be refunded to HECO’s customers, with interest.

In the interim D&O, the PUC indicated the parties are allowed to provide additional testimonies regarding the items excluded from the statement of probable entitlement and requested additional testimonies on certain issues by July 20, 2009. HECO, the Consumer Advocate and the DOD provided testimonies on those issues on July 20, 2009. On July 17, 2009, the PUC rescheduled the evidentiary hearing that was originally scheduled to begin the week of August 10, 2009 to instead begin the week of October 26, 2009. As the PUC did not accept the material terms of the settlement agreement, any (and all) of the parties may withdraw from the agreement and pursue their respective positions at the hearing, but none of the parties have indicated an intention to do so.

Management cannot predict the timing, or ultimate outcome, of a final D&O in this rate case.

HELCO.

*2006 test year rate case.* In May 2006, HELCO filed a request with the PUC to increase base rates by $29.9 million, or 9.24% in annual base revenues, based on a 2006 test year, an 8.65% ROR, an 11.25% ROACE and a $369 million average rate base. HELCO’s application included a proposed new tiered rate structure, which would enable most residential users to see smaller increases in the range of 3% to 8%. The tiered rate structure was designed to minimize the increase for residential customers using less electricity and is expected to encourage customers to take advantage of solar water heating programs and other energy management options. In addition, HELCO’s application proposed new time-of-use service rates for residential and commercial customers. The proposed rate increase would pay for improvements made to increase reliability, including transmission and distribution line improvements and the two generating units at the Keahole power plant (CT-4 and CT-5), and increased O&M expenses. The application requested the continuation of HELCO’s ECAC.

The PUC held public hearings on HELCO’s application in June 2006. In February 2007, the Consumer Advocate submitted its testimony in the proceeding, recommending a revenue increase of $16.6 million based on its proposed ROR of 7.95%, a ROACE ranging between 9.50% and 10.25% and a proposed average rate base of $345 million. The Consumer Advocate recommended adjustments of $21.5 million to HELCO’s rate base for a portion of CT-4 and CT-5 costs (primarily relating to HELCO’s allowance for funds used during construction (AFUDC), land use permitting costs, and related litigation expenses). In the filing, the Consumer Advocate’s consultant concluded that HELCO’s ECAC provides a fair sharing of the risks of fuel cost changes between HELCO and its ratepayers in a manner that preserves the financial integrity of HELCO without the need for frequent rate filings.

Keahole Defense Coalition (whose participation in the proceeding is limited) submitted in February 2007 a Position Statement in which it contended that the PUC should exclude from rate base a greater amount of the CT-4 and CT-5 costs than proposed by the Consumer Advocate.

In March 2007, HELCO and the Consumer Advocate reached settlement agreements on all revenue requirement issues in the HELCO 2006 rate case proceeding, which were documented in an April 5, 2007 settlement letter. Under the revenue requirement agreement, HELCO agreed to write-off a portion of CT-4 and CT-5 costs, which resulted in an after-tax charge of approximately $7 million in the first quarter of 2007.

On April 4, 2007, the PUC issued an interim D&O, which was implemented by tariff changes made effective on April 5, 2007, granting HELCO an increase of 7.58%, or $24.6 million in annual revenues, over revenues at present rates for a normalized 2006 test year. The interim increase reflects the settlement of the revenue requirement issues reached between HELCO and the Consumer Advocate and is based on an average rate base of $357 million (which reflects the write-off of a portion of CT-4 and CT-5 costs) and an ROR of 8.33% (incorporating an ROACE of 10.7%). In the interim D&O, the PUC also approved on an interim basis the adoption of pension and OPEB tracking mechanisms (see Note 4 of HECO’s “Notes to Consolidated Financial Statements”).

Pursuant to an agreed upon schedule of proceedings, Keahole Defense Coalition filed a response to HELCO’s rebuttal testimony on April 28, 2007, to which HELCO responded on May 11, 2007. On May 15, 2007, HELCO and the Consumer Advocate filed a settlement letter that reflected their agreement on the remaining rate design issues in the proceeding. HELCO and the Consumer Advocate filed their opening briefs in support of their settlement on June 4, 2007 and agreed not to file reply briefs. In April 2008, HELCO and the Consumer Advocate filed a supplement providing additional record cites and supporting information relevant to their April 2007 settlement letter. In July 2008, HELCO submitted responses to information requests from the PUC regarding the impacts of passing changes in fuel and purchased energy costs to customers through the ECAC.

Management cannot predict the timing, or the ultimate outcome, of a final D&O in this rate case.

*2010 test year rate case.* On July 17, 2009, HELCO filed a Notice of Intent to file an application for a general rate increase on or after November 25, 2009 (but before January 1, 2010).

MECO.

*2007 test year rate case.* In February 2007, MECO filed a request with the PUC to increase base rates by $19.0 million, or 5.3% in annual base revenues, based on a 2007 test year, an 8.98% ROR, an 11.25% ROACE and a $386 million average rate base. MECO’s application included a proposed new tiered rate structure for residential customers to reward customers who practice energy conservation with lower electric rates for lower monthly usage. The proposed rate increase would pay for improvements to increase reliability, including two new generating units added since MECO’s last rate case (which was based on a 1999 test year) at its Maalaea Power plant (M19, a 20 MW CT placed in service in 2000 and M18, an 18 MW steam turbine placed in service in October 2006 to complete the installation of a second dual-train combined cycle unit), and transmission and distribution infrastructure improvements. The proposed rate structure also included continuation of MECO’s ECAC. The application requested a return on MECO’s pension assets (i.e., accumulated contributions in excess of accumulated net periodic pension costs) by including such assets (net of deferred income taxes) in rate base. The application also proposed to restore book equity (in determining the equity balance for ratemaking purposes) for the amounts that were charged against equity (i.e., to AOCI) as a result of recording a pension and other postretirement benefits liability after implementing SFAS No. 158.

In an update to its direct testimonies filed in September 2007, MECO proposed a lower increase in annual revenues of $18.3 million, or 5.1%, but its request continued to be based on an 8.98% ROR and an 11.25% ROACE. Also in the update, MECO proposed tracking mechanisms for pension and OPEB, similar to the mechanisms proposed by HECO and HELCO, and approved by the PUC on an interim basis, in their 2007 and 2006 test year rate cases, respectively. In October 2007, the Consumer Advocate filed its direct testimony which recommended a revenue increase of $8.9 million, based on a ROR of 8.29% and a ROACE of 10.0%. $4.75 million of the $9.4 million difference between MECO’s and the Consumer Advocate’s proposed increase is caused by the Consumer Advocate’s lower recommended ROR and ROACE.

On December 7, 2007, MECO and the Consumer Advocate (for purposes of this section, the “parties”) reached a settlement of all the revenue requirement issues in this rate case proceeding. For purposes of the settlement agreement, the parties agreed that MECO’s ECAC provides a fair sharing of the risks of fuel cost changes between MECO and its ratepayers and no further changes are required for MECO’s energy adjustment clause to comply with the requirements of Act 162.

On December 21, 2007, the PUC issued an interim D&O granting MECO an increase of $13.2 million in annual revenues, or a 3.7% increase, subject to refund with interest. The interim increase is based on the settlement agreement, which included as a negotiated compromise of the Parties’ respective positions, an increase of $13.2 million in annual revenue, a 10.7% ROACE, an 8.67% ROR and a rate base of $383 million (which did not include MECO’s pension asset, which amounted to $1 million as of December 31, 2007).

In the interim D&O, the PUC also approved on an interim basis the adoption of pension and OPEB tracking mechanisms (see Note 4 of HECO’s “Notes to Consolidated Financial Statements”).

On July 17, 2009, the parties filed joint proposed findings of fact and conclusions of law.

Management cannot predict the timing, or the ultimate outcome, of a final D&O in this rate case.

*2010 test year rate case.* On July 17, 2009, MECO filed a Notice of Intent to file an application for a general rate increase on or after September 30, 2009 but before January 1, 2010.

***Decoupling proceeding***. In the Energy Agreement, the parties agreed to seek approval from the PUC to implement, beginning with the 2009 HECO rate case interim decision, a decoupling mechanism, similar to that in place for several California utilities, which decouples revenue of the utilities from KWH sales and provides revenue adjustments (increases/decreases) for the differences (shortages/overages) between the amount determined in the last rate case and (a) the current cost of operating the utility as deemed reasonable and approved by the PUC, (b) the return on and return of ongoing capital investment (excluding projects included in a proposed new Clean Energy Infrastructure Surcharge), and (c) changes in tax expense due to changes in State or Federal tax rates. The decoupling mechanism would be subject to review at any time by the PUC or upon request of the utility or Consumer Advocate.

On October 24, 2008, the PUC opened an investigative proceeding to examine implementing a decoupling mechanism for the utilities. In addition to the utilities and the Consumer Advocate, there are five other parties in the proceeding. On May 11, 2009, the utilities and the Consumer Advocate filed their joint final statement of position and the other parties filed their final statements of position. The utilities’ and Consumer Advocate’s joint proposal is for a decoupling mechanism with two components: (1) a sales decoupling component via a revenue balancing account and a revenue escalation component via a revenue adjustment mechanism and (2) an earnings sharing mechanism. Panel hearings at the PUC were completed on July 1, 2009 and the PUC has requested additional information from the parties, to which HECO is responding. Briefing by the parties is scheduled to be completed in September 2009.

Management cannot predict the timing, or the ultimate outcome, of a final D&O in the decoupling proceeding.

**Other regulatory matters.** In addition to the items below, also see “Hawaii Clean Energy Initiative” and “Major projects” in Note 5 of HECO’s “Notes to Consolidated Financial Statements” for a number of actions committed to in the Energy Agreement that will require PUC approval in either pending or new PUC proceedings.

Demand-side management programs. On February 13, 2007, the PUC issued its D&O in the Energy Efficiency Demand-Side Management (EE DSM) Docket that had been opened by the PUC to bifurcate the EE DSM issues originally raised in the HECO 2005 test year rate case. In the D&O, the PUC required that the administration of all EE DSM programs be turned over to a non-utility, third-party administrator, with the transition to the administrator, funded through a public benefits fund (PBF) surcharge. The PUC opened a new docket to select a third-party administrator and to refine details of the new market structure in an order issued in September 2007. In the order, the PUC stated that “\[u\]pon selection of the PBF Administrator, the PUC intends, in this docket, to determine whether the electric utilities will be allowed to compete for the implementation of the Energy Efficiency DSM programs.” In July 2008, the PUC issued an Order to Initiate the Collection of Funds for the PBF Administrator of Energy Efficiency Programs, which authorized the electric utilities to expense $50,000 per quarter beginning July 1, 2008 for the initial start-up costs associated with the PBF Administrator and recover the cost in the DSM surcharge; confirmed that the load management, SolarSaver Pilot (SSP) and Residential Customer Energy Awareness programs shall remain with the electric utilities; and directed the electric utilities to continue to operate the DSM programs through June 30, 2009, after which transition period the electric utilities can compete for implementation of DSM programs as a subcontractor. The PUC issued its RFP for the PBF Administrator and proposals were received.

In December 2008, the PUC notified Science Applications International Corporation (SAIC) that it had been selected to continue negotiations with the PUC to become the PBF Administrator. The utilities had worked with SAIC to develop the PBF Administrator proposal selected by the PUC that included continued delivery of the existing energy efficiency programs by the utilities as subcontractor to SAIC. The PUC executed a PBF Administrator contract with SAIC in March 2009. HECO subsequently entered into discussions with SAIC on HECO’s role as a subcontractor to SAIC.

On December 15, 2008, the PUC ordered that the $50,000 collected by the utilities during the third quarter of 2008 was to be paid to the PUC. In a separate order, “Order Setting the Public Benefits Fee Surcharge for 2009” (Order), also dated December 15, 2008, the PUC established a Public Benefits Fund equal to 1% of estimated 2009 total revenues that would be used for the 2009 implementation of energy efficiency programs, of which 40% would be collected through the PBF Surcharge for use by the PBF Administrator, and 60% would be collected through the DSM Surcharge to be used by the utilities for their energy efficiency programs until those programs were transferred to the PBF Administrator. The 2009 budgets for the SSP Program and the two load management programs (Residential Direct Load Control and Commercial and Industrial Direct Load Control Programs) remained unaffected. The Order stated that the 60/40 split “roughly equates with the proportionate period of time that the commission expects the HECO Companies and the third-party administrator to provide services in 2009.” The utilities issued new PBF Surcharge and revised DSM Surcharge filings effective January 1, 2009.

The utilities filed new DSM program budgets and goals on January 20, 2009.

The Order also ended the expensing and collection of $50,000 per quarter as of January 1, 2009. The $100,000 collected in total during the third and fourth quarters of 2008, plus interest, was delivered to the PUC’s PBF fiscal agent, as instructed, on January 2, 2009. The utilities were ordered to transfer the collected PBF Surcharge revenues, less the revenue tax liabilities, to the PUC’s PBF fiscal agent beginning on March 1, 2009, and monthly thereafter.

On May 13, 2009, having been unable to negotiate an acceptable agreement to be a subcontractor to SAIC, HECO ended negotiations and began to focus on implementing the transition of the energy efficiency programs to the PBF Administrator. On July 1, 2009, SAIC began administering the energy efficiency DSM programs.

The EE DSM Docket D&O also provides for HECO’s recovery of DSM program costs and utility incentives. With respect to cost recovery, the PUC continues to permit recovery of reasonably-incurred DSM implementation costs, under the IRP framework. On June 29, 2009, HECO filed with the PUC a request to increase its residential DSM programs budget by a net $1.4 million primarily to pay customer incentives related to DSM program applications that will have been completed and approved through June 30, 2009. The payments to customers of these incentives had been postponed in order for HECO to remain within the monthly program budgets. In June 2009, HECO accrued and expensed the net $1.4 million of incentives. The PUC required that HECO confirm that all required payments of customer incentives (related to undisputed program applications completed and approved through June 30, 2009 for the Residential Efficient Water Heating and Residential New Construction Programs) have been made, and HECO made the required incentive payments and provided the required confirmation in July 2009. HECO is awaiting a determination from the PUC on its request to increase its program budget.

DSM utility incentives will be derived from a graduated performance-based schedule of net system benefits. In order to qualify for an incentive, the utility must meet cumulative MW and MWh reduction goals for its EE DSM programs in both the commercial and industrial sector, and the residential sector. The amount of the annual incentive is capped at $4 million for HECO, and may not exceed either 5% of the net system benefits, or utility earnings opportunities foregone by implementing DSM programs in lieu of supply-side rate based investments. Negative incentives will not be imposed for underperformance.

In 2007, HECO recorded incentives of $4 million. HELCO and MECO proposed goals for their programs, based on the goals established for HECO’s programs, but recorded no incentives in 2007. On May 21, 2007, the PUC clarified the 2007 and 2008 energy efficiency goals and the calculation of the DSM utility incentive, and granted HECO the ability to request program modifications and budget increases by letter request. Since that time, the PUC has approved budget increases and program modifications for various DSM programs. In June 2008, the PUC issued an order approving MECO’s proposed cumulative energy and demand savings goals for 2007 and 2008, but set MECO’s annual incentive cap at $320,000. Thus, in the second quarter of 2008, MECO recorded an incentive of $320,000 related to 2007. The PUC also issued an order approving HELCO’s proposed cumulative energy and demand savings goals for 2007 and 2008, and an annual incentive cap of $200,000. However, HELCO did not achieve those goals and, therefore, no incentives were earned by HELCO. The utilities’ DSM incentives for 2007 and 2008 were subject to adjustment based on the results of impact evaluation studies.

In December 2008, the results of the impact evaluation studies became available. The impact evaluation reduced actual DSM energy and demand savings for 2005 through 2007. As a result of the reduced savings, the utilities’ Lost Margin and Shareholder Incentives earned in 2005 and 2006 were reduced. In addition, MECO no longer met its 2007 goals for DSM utility incentives. As a result of these changes, the utilities accrued a refund to its customers of $1.4 million, including interest, in December 2008.

HECO and MECO surpassed their energy and demand savings goals for 2008 and earned their maximum DSM utility incentives of $4 million and $320,000, respectively. In its December 15, 2008 Order, in anticipation of the transfer of the DSM programs to the third-party administrator during 2009, the PUC decreased the maximum DSM utility incentive for HECO to $2 million for 2009 and decreased HELCO’s and MECO’s maximum incentives to $100,000 and $160,000, respectively, for 2009.

HECO filed its annual DSM Accomplishments and Surcharge Report (A&S Report) on March 31, 2009, which documents HECO’s portion of the refund for years 2005 and 2006 and its earned DSM utility incentive of $4 million. MECO filed its A&S Report on April 30, 2009, documenting its portion of the refund and its earned DSM utility incentive of $320,000.

Unlike the EE DSM programs, load management DSM programs will continue to be administered by the utilities. HECO’s residential load management program includes a monthly electric bill credit for eligible customers who participate in the program, which allows HECO to disconnect the customer’s residential electric water heaters or central air conditioning systems from HECO’s system to reduce system load when deemed necessary by HECO. The commercial and industrial load management program provides an incentive on the portion of the demand load that eligible customers allow to be controlled or interrupted by HECO. This program includes small business direct load control and voluntary program elements.

In March and April 2009, HECO filed applications for three-year extensions, from 2010 through 2012, of the Commercial and Industrial Direct Load Control Program and the Residential Direct Load Control Program, respectively.

In April 2008, HECO filed an application for approval of a Dynamic Pricing Pilot (DPP) Program and for recovery of the incremental costs of the program through the DSM Adjustment component of the IRP Cost Recovery Provision. Dynamic pricing is a type of demand response program that allows prices to change from normal tariff rates as system conditions change and encourages customer curtailment of load through price incentives when there is insufficient generation to meet a projected peak demand period. The proposed pilot program would run for approximately one year and test the effect of a demand response program on a sample of residential customers. In its February 18, 2009 Statement of Position (SOP), the Consumer Advocate did not object to the PUC’s approval of the proposed pilot program, with certain qualifications. On June 8, 2009, the PUC, in its “Order Directing HECO to Modify its Dynamic Pricing Pilot Program,” directed HECO to “modify the DPP Program to address the recommendations and concerns outlined in the Consumer Advocate’s SOP”, or alternatively, “HECO and the Consumer Advocate may file a stipulated proposed DPP Program.” HECO plans to meet with the Consumer Advocate to discuss its recommendations and concerns in order to respond to the PUC’s order. The contents of HECO’s response and its filing date are dependant on the outcome of discussions with the Consumer Advocate.

Avoided cost generic docket. In May 1992, the PUC instituted a generic investigation to examine the proxy method and formula used by the electric utilities to calculate their avoided energy costs and Schedule Q rates. In general, Schedule Q rates are available to customers with cogeneration and/or small power production facilities with a capacity of 100 kW or less who buy power from or sell power to the electric utility. The parties to the proceeding agreed that avoided fuel costs, except for Lanai and Molokai, would be determined using a computer production simulation model and agreed on certain parameters that would be used to calculate avoided costs. In March 2008, the PUC ordered that the new avoided energy cost rates and Schedule Q rates would go into effect on August 1, 2008. HECO, HELCO and MECO filed new avoided energy costs rates and Schedule Q rates, which were determined using the new differential revenue requirements “resource-in/resource-out” methodology instead of the proxy method. These rates were effective from August 1 through December 31, 2008, and the fuel component of the rates was adjusted monthly for changes in fuel prices.

On April 18, 2008, the PUC initiated a docket to examine the methodology for calculating Schedule Q electricity payment rates in the State of Hawaii. The proceeding was intended to examine new methodologies for calculating Schedule Q payment rates, with the intent of removing or reducing any linkages between the price of fossil fuels and the rate for non-fossil fuel generated electricity. The parties to the Energy Agreement agreed that all new renewable energy contracts are to be delinked from fossil fuel and that the utilities would seek to renegotiate existing PPAs with independent power producers (IPPs) that are based on fossil fuel prices to delink their energy payment rates from oil costs. Based on this understanding, the parties agreed to request that the PUC suspend the pending Schedule Q proceeding for a period of 12 months with a view to reviewing the necessity of the docket. On November 28, 2008, the PUC granted the request to suspend the Schedule Q proceeding for 12 months. On December 31, 2008, HECO, HELCO and MECO filed avoided energy costs rates and Schedule Q rates to be effective for 2009, subject to monthly adjustment of the fuel component of the rates for changes in fuel prices.

Integrated resource planning, requirements for additional generating capacity and adequacy of supply. The PUC issued an order in 1992 requiring the energy utilities in Hawaii to develop integrated resource plans (IRPs), which may be approved, rejected or modified by the PUC. The goal of integrated resource planning is the identification of demand- and supply-side resources and the integration of these resources for meeting near- and long-term consumer energy needs in an efficient and reliable manner at the lowest reasonable cost. The utilities’ proposed IRPs are planning strategies, rather than fixed courses of action, and the resources ultimately added to their systems may differ from those included in their 20-year plans. Under the PUC’s IRP framework, the utilities are required to submit annual evaluations of their plans (including a revised five-year program implementation schedule) and to submit new plans on a three-year cycle, subject to changes approved by the PUC. Prior to proceeding with the DSM programs, separate PUC approval proceedings must be completed.

The utilities were to be entitled to recover all appropriate and reasonable integrated resource planning and implementation costs, including the costs of DSM programs, either through a surcharge or through their base rates. Under procedural schedules for the IRP cost proceedings, the utilities were able to recover their incremental IRP costs in the month following the filing of their actual costs incurred for the year, subject to refund with interest pending the PUC’s final D&O approving recovery in the docket for each year’s costs. HELCO (since February 2001), HECO (since September 2005) and MECO (since December 2007) now recover IRP costs (which are included in O&M) through base rates. Previously, HECO, HELCO and MECO recovered their costs through a surcharge. The Consumer Advocate has objected to the recovery of $1.2 million (before interest) of the $4.0 million of incremental IRP costs incurred by the utilities during the 2002-2007 period, and the PUC’s decisions on the recovery of these costs are pending. Also, see Note 5 in HECO’s “Notes to Consolidated Financial Statements” and “Demand-side management programs” above.

The parties to the Energy Agreement agreed to seek to replace the IRP process with a new Clean Energy Scenario Planning (CESP) process, described in the Energy Agreement, intended to be used to determine future investments in transmission, distribution and generation that will be necessary to facilitate high levels of renewable energy production. Requests by the parties to the Energy Agreement to move to the CESP process were filed with the PUC on November 6, 2008, and the PUC acted on those requests by ordering the utilities and the Consumer Advocate to develop a joint proposal for a framework for the CESP process. HECO and the Consumer Advocate filed a proposed CESP framework with the PUC on April 28, 2009. The proposed CESP framework revises the previous IRP framework and proposes a planning process to develop generation and transmission resource plan options for multiple 20-year planning scenarios. From these scenarios, the framework proposes the development of a 5-year Action Plan based on range of resource needs identified through the various scenarios analyzed. Furthermore, the framework proposes that the CESP include the identification of Renewable Energy Zones, or geographic areas of the islands of rich renewable energy resources in which infrastructure improvements should be focused. The framework also proposes that the CESP include the identification of any geographic areas of the distribution system in which distributed generation or DSM resources are of higher value. The parties committed to supporting reasonable and prudent investment in the ongoing maintenance and upgrade of the existing generation, transmission and distribution systems, unless the CESP process determines otherwise. On May 14, 2009, the PUC opened an investigative proceeding to examine the proposed CESP framework. In addition to HECO, HELCO, Kauai Island Utility Cooperative (KIUC) and the Consumer Advocate, eleven parties have been allowed as intervenors in the proceeding.

*HECO’s IRP.* On September 30, 2008, HECO filed its fourth IRP (IRP-4) covering a 20-year (2009-2028) planning horizon, subject to PUC approval. The IRP-4 preferred plan called for all future generation to be renewable. In addition, it called for conversion of a number of existing HECO-owned generating units to utilize biofuels and for continued aggressive implementation of DSM programs. In addition to CIP CT-1, HECO had plans to pursue the installation of a 100 MW biofueled CT at the same station in the 2011-2012 timeframe and to submit to the PUC a request for a waiver from the competitive bidding process to install this increment of additional firm capacity. The addition of two simple-cycle CTs would add to the system additional fast starting and ramping capability, which would facilitate integration of as-available generation (such as wind and solar) to the system. HECO also had plans to remove Waiau Unit 3, a 46 MW oil-fired cycling unit, from service after the second CT is in service, and would later determine whether to place the unit in emergency reserve status or to retire the unit. Subsequent to the filing of IRP-4, HECO is revisiting its plans to submit an application and waiver request for the second CT at Campbell Industrial Park given the uncertainty of future sales and peak demand.

When the necessary test biofuels are obtained, HECO plans to conduct a test on Kahe Unit 3 to evaluate the use of Low Sulfur Fuel Oil/biofuel blends in existing oil-fired steam units. Other renewable generation will be acquired via three renewable energy projects “grandfathered” from competitive bidding and from projects that are selected from proposals submitted in response to HECO’s 100 MW RFP for Non-Firm Energy (see “Competitive bidding proceeding” above).

On November 26, 2008, the PUC closed the HECO IRP-4 process and directed HECO to suspend all activities pursuant to the IRP framework to allow for resources to be diverted to the development of a CESP framework.

*HELCO’s IRP.* In May 2007, HELCO filed its third IRP. The plan included the installation of a nominal 16 MW steam turbine (ST-7) in 2009 at its Keahole Generating Station (see “Major projects” in Note 5 of HECO’s “Notes to Consolidated Financial Statements”). The plan also followed through on a commitment to have no new fossil-fired generation installed after ST-7. The plan anticipated increasing customer photovoltaic systems plus a 37 gigawatthours per year renewable energy resource in the 2014 to 2020 timeframe, a firm capacity renewable energy resource in 2022, energy efficiency (continuation of existing DSM programs) and CHP. In November 2007, HELCO and the Consumer Advocate filed a stipulated agreement which recommended that the PUC approve HELCO’s IRP-3 and in which HELCO agreed to make improvements to the IRP process and to submit evaluation reports. In January 2008, the PUC issued its D&O approving HELCO’s IRP-3 and required HELCO to submit annual evaluation reports and file its IRP-4 by May 31, 2010.

On November 26, 2008, the PUC suspended the HELCO IRP-4 process and directed HELCO to suspend all activities pursuant to the IRP Framework to allow for resources to be diverted to the development of a CESP framework.

*MECO’s IRP.* In April 2007, MECO filed its third IRP, which proposes multiple solutions to meet future energy needs on the islands of Maui, Lanai and Molokai, including renewable energy resources (such as photovoltaics, additional wind, biomass and waste-to-energy), energy efficiency (continuation of existing and addition of new DSM programs), technology (such as CHP and DG) and competitive bidding for generation or blocks of generation on Maui for 20 MW in each of 2011 and 2013 and 18 MW in 2024 which, under the utility parallel plan, could be located at its Waena site. In July 2008, the PUC approved MECO’s IRP-3 and directed MECO to submit evaluation reports, to make various improvements to the IRP process and to submit its IRP-4 by April 30, 2010.

On December 8, 2008, the PUC suspended the MECO IRP-4 process and directed MECO to suspend all activities pursuant to the IRP Framework to allow for resources to be diverted to the development of a CESP framework.

HECO’s 2009 CIP CT-1 and transmission line. See “CIP CT-1 and transmission line” in Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

Adequacy of supply.

*HECO.* HECO’s 2009 Adequacy of Supply (AOS) letter, filed in February 2009, indicated that HECO’s analysis estimates its reserve capacity shortfall to be approximately 30 MW in 2009, even with the addition of the CIP CT-1, primarily because shortfalls are projected to occur before the unit is installed and will not be entirely alleviated once the unit is available for service. Generation shortfalls did not occur during the first half of 2009, in part because power demand was consistently less than forecasted primarily due to weather that was cooler than normal. Moreover, sustained maintenance efforts have resulted in a leveling in availability rates that had been declining since 2002, at levels that continue to be better than those for comparable units on the U.S. mainland. Barring unforeseen equipment failures, generation capacity shortfalls were not expected to occur prior to startup of CIP CT-1 when reserve capacity conditions were substantially improved.

To mitigate the projected reserve capacity shortfalls, HECO has implemented and is continuing to plan and implement mitigation measures, such as installing distributed generators at substations or other sites, implementing additional load management and other demand reduction measures, and pursuing efforts to improve the availability of generating units. HECO will operate at lower than desired reliability levels and take steps to mitigate the reserve capacity shortfall situation until the next generating unit is installed. Until sufficient generating capacity can be added to the system, HECO will experience a higher risk of generation-related customer outages.

HECO reported in its 2009 AOS letter that, after the scheduled mid-2009 addition of the CIP CT-1, and in recognition of the uncertainty underlying key forecasts, it anticipates that its reserve capacity situation could range from a shortfall of 10 MW if demand is higher than expected to a surplus of 50 MW in a base case scenario for

2010, with the shortfalls higher and the surpluses lower in future years. However, in May 2009, HECO prepared a new sales and peak forecast in which HECO projects peak demand to be lower than previously forecast. The impact of this lower peak demand forecast on HECO’s reserve capacity needs is currently being evaluated. As noted under “HECO’s IRP” above, HECO is revisiting its plans to submit an application and waiver request to pursue the installation of a second biofueled CT (100 MW) at its CIP generating station in the 2011-2012 timeframe given its projection of future sales and peak demand. HECO may seek, under the guidance of the Competitive Bidding Framework issued by the PUC in December 2006, a firm, dispatchable renewable resource to meet future needs, while continuing contingency planning activities.

HECO’s gross peak demand was 1,327 MW in 2004, 1,273 MW in 2005, 1,315 MW in 2006, 1,261 MW in 2007 and 1,227 MW in 2008. Peak demand may vary from year to year, but over time, demand for electricity on Oahu is projected to increase. On occasions in 2004 through 2007, HECO issued public requests that its customers voluntarily conserve electricity as generating units were out for scheduled maintenance or were unexpectedly unavailable. In addition to making the requests, in 2005 through 2007, HECO on occasion remotely turned off water heaters for a number of residential customers who participate in its load-control program. No such requests were made or actions taken in 2008 or thus far in 2009.

*HELCO.* HELCO’s 2009 Adequacy of Supply letter filed in January 2009 indicated that HELCO’s generation capacity for the next three years, 2009 through 2011, is sufficiently large to meet all reasonably expected demands for service and provide reasonable reserves for emergencies.

*MECO.* MECO’s 2009 Adequacy of Supply letter filed in January 2009 indicated that MECO’s generation capacity for the next three years, 2009 through 2011, is sufficient to meet the forecasted demands on the islands of Maui, Lanai and Molokai. MECO’s 2009 Adequacy of Supply letter also indicated that the date the next increment of additional firm generating capacity on Maui is needed has changed from 2014 to 2015 due primarily to a reduction in the forecast of peak demand.

The PPA between MECO and Hawaiian Commercial & Sugar Company (HC&S), which provides for 16 MW of firm capacity, continues in effect from year to year, subject to termination on written notice by either party of not less than two years. In July 2007, however, the parties agreed to not issue a notice of termination that would result in the termination of the PPA prior to the end of 2014.

December 2008 outage. On December 26, 2008, an island-wide outage occurred on the island of Oahu that resulted in a loss of electric service to HECO customers ranging from approximately 7 to 20 hours.

On January 12, 2009, the PUC issued an order initiating an investigation of the outage to address the following preliminary issues: (1) what caused the outage; (2) if lightning strikes during the lightning storm initially caused the power outage, could HECO have reasonably prevented damaging effects of lightning strikes to prevent the power outage from initially occurring; (3) through reasonable measures, could HECO have prevented the power outage or prevented it from becoming island-wide; (4) could HECO have reasonably shortened the duration of the power outage and restored power more quickly to customers; (5) what are the necessary steps to prevent similar power outages in the future, to minimize the scope and duration of similar power outages and to improve HECO’s response to such outages in the future; and (6) what penalties, if any, should be imposed on HECO.

On March 31, 2009, HECO submitted its outage report that was prepared by its expert consultant, POWER Engineers, Inc. (POWER). The outage report concluded that the island-wide outage was triggered by lightning strikes on or near HECO’s 138 kilovolt (kV) transmission system, one of which resulted in a short-circuit over all three phases of the Kahe-Waiau 138 kV line, setting in motion a series of events that resulted in the necessary loss of customer load, loss of generation and the eventual island-wide shut down of HECO’s system. POWER found that: (1) the HECO system was in proper operating condition and was appropriately staffed at the time of the lightning storm, and (2) HECO’s restoration efforts were prudent and allowed for the restoration of power as quickly as possible under the circumstances, while also ensuring the safety and protection of HECO’s employees and customers and preventing any further or permanent damage to the electric system from attempts to bring the system back too quickly. POWER made a number of recommendations, largely technical in nature, for HECO to consider that may reduce the likelihood of the recurrence of a similar power outage or minimize the duration of an outage should one occur in the future.

The Consumer Advocate and the PUC will review the outage report and conduct their own independent reviews.

Management cannot at this time predict the outcome of the PUC’s or Consumer Advocate’s investigations or their impact on HECO.

Intra-governmental wheeling of electricity. In June 2007, the PUC initiated a docket to examine the feasibility of implementing intra-governmental wheeling of electricity in the State of Hawaii. In the fourth quarter of 2008, the Department of Business, Economic Development and Tourism requested (in accordance with the provisions of the Energy Agreement) that the PUC suspend the pending intra-governmental wheeling docket for a period of 12 months while the parties to the agreement evaluate the necessity of the docket in view of the other agreements of the parties. The PUC approved the request, provided that the PUC, at its option, may re-institute this docket at an earlier date.

Energy Independence and Security Act of 2007. On February 11, 2009, the PUC issued an order initiating an investigation whether to implement any of four new federal standards, as required by the Public Utility Regulatory Policies Act of 1978, as amended by the Energy Independence and Security Act of 2007. In summary, the four standards are as follows: (1) each electric utility shall integrate energy efficiency resources into utility, state and regional plans and adopt policies establishing cost-effective energy efficiency as a priority resource; (2) electric utility rates shall align utility incentives with the delivery of cost-effective energy efficiency and promote energy efficiency investments; (3) each state shall consider requiring that, prior to undertaking investments in non-advanced grid technologies, an electric utility demonstrate to the state that it considered an investment in a qualified smart grid system; and (4) all electricity purchasers shall be provided direct access to pricing, usage and power source information from their electricity provider. The PUC named HECO, HELCO, MECO, Kauai Island Utility Cooperative and the Consumer Advocate as parties in this proceeding. In May 2009, HECO, HELCO and MECO filed a joint position statement recommending that the PUC decline to adopt the four new federal standards, as there are already existing processes and proceedings before the PUC to consider Hawaii-specific standards. Management cannot predict the outcome of this proceeding.

***Collective bargaining agreements***. See “Collective bargaining agreements” in Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

***Legislation and regulation.*** Congress and the Hawaii legislature periodically consider legislation that could have positive or negative effects on the utilities and their customers. Also see “Hawaii Clean Energy Initiative” and “Environmental regulation” in Note 5 of HECO’s “Notes to Consolidated Financial Statements” and “Emergency Economic Stabilization Act of 2008 and American Economic Recovery and Reinvestment Act of 2009” above.

Renewable Portfolio Standard. Act 155, passed by the 2009 Hawaii legislature and signed into law by the Governor, has amended Hawaii’s RPS law to require electric utilities to meet an RPS of 10% by December 31, 2010, 15% by December 31, 2015, 25% by December 31, 2020, and 40% by December 31, 2030. The revised RPS law is consistent with the commitment the utilities agreed to in the Energy Agreement signed as part of the HCEI and provides that beginning January 1, 2015, electrical energy savings from renewable energy displacement technologies (such as solar water heating) or from energy efficiency and conservation programs shall not count toward the RPS. The amended RPS law includes a requirement for the PUC to evaluate the standard every five years, beginning in 2013, to determine whether the standards remain effective and achievable and whether the standards should be revised in light of their findings. The standard under the law prior to the amendment (8% of KWH sales by December 31, 2005) was met in 2005 when the electric utilities attained an RPS of 11.7%. The utilities are committed to achieving these goals; however, due to risks such as potential delays in IPPs being able to deliver contracted renewable energy (see risks under Forward-looking Statements), it is possible the electric utilities may not attain the required renewable percentages in the future, and management cannot predict the future consequences of failure to do so (including potential penalties to be assessed by the PUC).

The RPS law was amended in 2006 to add provisions for penalties if the utility fails to meet its RPS requirements, to require the PUC to conduct a hearing prior to assessing penalties, and to amend the criteria for waiver of the penalties by the PUC. In January 2007, the PUC opened a new docket (RPS Docket) to examine Hawaii’s RPS law, to establish the appropriate penalties for failure to meet RPS targets and to determine the circumstances under which penalties should be levied. The issues also included the appropriate utility ratemaking structure to include in the RPS framework to provide incentives that encourage electric utilities to use cost-effective renewable energy resources found in Hawaii to meet the RPS, while allowing for deviation from the standards in the event that the standards cannot be met in a cost-effective manner, or as a result of circumstances beyond the control of the utility that could not have been reasonably anticipated or ameliorated.

In December 2007, the PUC issued a D&O approving a stipulated RPS framework to govern electric utilities’ compliance with the RPS law. In a follow up order in December 2008, the PUC approved a penalty of $20 for every MWh that an electric utility is deficient under Hawaii’s RPS law. See “Hawaii Clean Energy Initiative” in Note 5 of HECO’s “Notes to Consolidated Financial Statements” for a further discussion of the penalty.

In its December 2007 D&O, the PUC deferred the RPS incentive framework to a new generic docket (Renewable Energy Infrastructure Program or REIP Docket). The parties to the REIP Docket include the electric utilities, the Consumer Advocate, an environmental organization and Hawaii Renewable Energy Alliance (HREA). Public hearings were held in May 2008.

The Renewable Energy Infrastructure Program proposed by HECO in the RPS docket consists of two components: (1) renewable energy infrastructure projects that facilitate third-party development of renewable energy resources, maintain existing renewable energy resources and/or enhance energy choices for customers, and (2) the creation and implementation of a temporary renewable energy infrastructure surcharge to recover the capital costs, deferred costs for software development and licenses, and/or other relevant costs approved by the PUC. These costs would be removed from the surcharge and included in base rates in the utility’s next rate case. In July 2008, statements of position were filed with the PUC, in which the Consumer Advocate recommended approval of, HREA supported, and the environmental organization did not oppose the REIP proposed by HECO. In October 2008, pursuant to the PUC’s request, the parties to the docket informed the PUC, among other things, that the parties (1) have reached an agreement on all of the issues in the docket, (2) agree that it is appropriate that the PUC approve the utilities’ proposed REIP and related REIP surcharge, (3) agree that the record in the proceeding is complete and ready for PUC decision-making, and (4) waive an evidentiary hearing. In the first quarter of 2009, the parties responded to information requests prepared by the PUC’s consultant, and in July 2009, the utilities and the Consumer Advocate submitted separate legal briefs, which responded to the PUC’s questions on legal issues.

In the Energy Agreement, the parties also agreed that the REIP may be modified to incorporate changes for the CEIS mechanism, provided the appropriate notices to the public regarding the changes are made.

On November 28, 2008, HECO and the Consumer Advocate filed a joint letter informing the PUC that the proposed REIP Surcharge is substantially similar to the CEIS and that the REIP Surcharge proposal satisfies the Energy Agreement commitment for the filing of an implementation procedure for the CEIS.

Management cannot predict the outcome of these proceedings and processes.

Net energy metering. Hawaii has a net energy metering law, which requires that electric utilities offer net energy metering to eligible customer generators (i.e., a customer generator may be a net user or supplier of energy and will make payment to or receive credit from the electric utility accordingly).

In 2005, the Legislature amended the net energy metering law by, among other revisions, authorizing the PUC, by rule or order, to increase the maximum size of the eligible net metered systems and to increase the total rated generating capacity available for net energy metering. In April 2006, the PUC initiated an investigative proceeding on whether the PUC should increase (1) the maximum capacity of eligible customer-generators to more than 50 kW and (2) the total rated generating capacity produced by eligible customer-generators to an amount above 0.5% of an electric utility’s system peak demand. The parties to the proceeding include HECO, HELCO, MECO, Kauai Island Utility Cooperative (KIUC), the Consumer Advocate, a renewable energy organization and a solar vendor organization. In March 2008, the PUC approved a stipulated agreement filed by the parties (except for KIUC, which has its own stipulated agreement) to increase the maximum size of the eligible customer-generators from 50 kW to 100 kW and the system cap from 0.5% to 1.0% of system peak demand, to reserve a certain percentage of the 1.0% system peak demand for generators 10 kW or less and to consider in the IRP process any further increases in the maximum capacity of customer-generators and the system cap. The PUC further required the utilities: (1) to consider specific items relating to net energy metering in their respective IRP processes, (2) to evaluate the economic effects of net energy metering in future rate case proceedings and (3) to design and propose a net energy metering pilot program for the PUC’s review and approval that will allow, on a trial basis, the use of a limited number of larger generating units (i.e., at least 100 kW to 500 kW, and may allow for larger units) for net energy metering purposes.

In April 2008, the electric utilities applied for PUC approval of a proposed four-year net energy metering pilot program to evaluate the effects on the grid of units larger than the currently approved maximum size. The program will consist of analytical investigations and field testing and is designed for a limited number of participants that own (or lease from a third party) and operate a solar, wind, biomass, or hydroelectric generator, or a hybrid system. The electric utilities propose to recover program costs through the IRP cost recovery provision.

In 2008, the net energy metering law was again amended to authorize the PUC, by rule or order, to modify the maximum size of the eligible net metered systems and evaluate on an island-by-island basis whether to exempt an island or utility grid system from the total rated generating capacity limits available for net energy metering.

In the Energy Agreement, the parties agreed to seek to remove system-wide caps on net energy metering. Instead, they plan to seek to limit DG interconnections on a per circuit basis and to replace net energy metering with an appropriate feed-in tariff and new net metered installations that incorporate time-of-use metering equipment for future full scale implementation of time-of-use metering and sale of excess energy.

On February 13, 2009, the parties to the Net Energy Metering proceeding filed a joint letter pointing out that the Energy Agreement calls for the development of a feed-in tariff that may eventually replace net energy metering and that the outcome of the feed-in tariff proceeding may influence the future direction of net energy metering. The parties proposed to provide an update on the proposed pilot program within a month after the completion of the feed-in tariff proceeding.

On December 3, 2008, HELCO, MECO and the Consumer Advocate filed stipulations to increase their net energy metering system caps from 1% to 3% of system peak demand (among other changes). On December 26, 2008, the PUC issued an order approving the proposed caps, but directed the parties to file a proposed plan to address the provisions regarding net energy metering in the Energy Agreement. The parties are required to file their proposed plans by August 14, 2009. The parties, however, will be allowed to amend their plans based on the decision in the FIT proceeding.

DSM programs. See “Demand-side management programs” above.

Non-fossil fuel purchased power contracts. In 2006, a law was enacted that required that the PUC establish a methodology that removes or significantly reduces any linkage between the price paid for non-fossil-fuel-generated electricity under future power purchase contracts and the price of fossil fuel, in order to allow utility customers to receive the potential cost savings from non-fossil fuel generation (in connection with the PUC’s determination of just and reasonable rates in purchased power contracts).

Greenhouse gas emissions reduction. In July 2007, Act 234 became law, which requires a statewide reduction of greenhouse gas (GHG) emissions by January 1, 2020 to levels at or below the statewide GHG emission levels in 1990. It also establishes a task force, comprised of representatives of state government, business (including the electric utilities), the University of Hawaii and environmental groups, which is charged with preparing a work plan and regulatory approach for “implementing the maximum practically and technically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases” to achieve 1990 statewide GHG emission levels. The electric utilities are participating in the Task Force, as well as in initiatives aimed at reducing their GHG emissions, such as those to be undertaken under the Energy Agreement. Because the full scope of the Task Force report remains to be determined and regulations implementing Act 234 have not yet been promulgated, management cannot predict the impact of Act 234 on the electric utilities and the Company.

If the U.S. Environmental Protection Agency (EPA) grants a waiver to California under the Clean Air Act (CAA) to allow state government control of GHG emissions from new motor vehicles sold in California and the Hawaii legislature passes a pending bill adopting the California motor vehicle emission standards, the ability of Hawaii to meet Act 234’s GHG reduction targets should be enhanced. Although several bills addressing GHG emission reductions also have been introduced in Congress, none has yet been adopted.

On April 7, 2007, in Massachusetts v. EPA, the U.S. Supreme Court ruled that the EPA has the authority to regulate GHG emissions from motor vehicles under the Clean Air Act (CAA or the Act). The Court further ruled that the EPA must determine whether or not motor vehicle GHG emissions cause or contribute to air pollution which may be reasonably anticipated to endanger public health or welfare (known as an “endangerment finding”), or whether the science about GHGs was too uncertain to make a reasoned decision. On July 11, 2008, the EPA issued its advance notice of proposed rulemaking (ANPR) inviting public comment on the benefits and ramifications of regulating GHGs under the CAA.

On March 10, 2009, the EPA issued a proposed rule under the CAA for the monitoring and reporting of GHG emissions. The rule would apply to fossil fuel suppliers and industrial gas suppliers, as well as to direct GHG emitters, including the electric utilities. As proposed, the rule only requires that sources above certain threshold levels monitor and report GHG emissions – it would not require control of GHGs.

In response to Massachusetts v. EPA, the EPA proposed an endangerment finding that current and projected concentrations of six key GHGs in the atmosphere threaten the public health and welfare of current and future generations and that motor vehicle emissions that contain four of the six GHGs identified in the endangerment finding contribute to climate change. The proposed endangerment finding was published in the Federal Register on April 24, 2009. The proposed finding, if adopted, would not require any specific action by industry and the EPA noted that an endangerment finding under one part of the CAA would not automatically trigger regulation under other parts of the CAA. Since, however, the CAA’s language regarding endangerment findings due to motor vehicle emissions is virtually identical to its language regarding stationary source emissions, such as those emitted from the electric utilities’ facilities, there is little doubt that the EPA will make the same or similar endangerment finding regarding GHG emissions from stationary sources. In the announcement of the proposed endangerment finding, the EPA stressed that the agency and President Obama’s administration prefer comprehensive legislation to address climate change due to GHG emissions and to create a framework for a clean energy economy.

Although, the proposed GHG reporting rule and proposed endangerment finding do not require control of GHGs, they are seen as necessary prerequisites for GHG reduction requirements under the CAA. The electric utilities, therefore, are reviewing the proposals.

Renewable energy. In 2007, a law was enacted that stated that the PUC may consider the need for increased renewable energy in rendering decisions on utility matters. Due to this measure, it is possible that, if energy from a renewable source were more expensive than energy from fossil fuel, the PUC may still approve the purchase of energy from the renewable source.

In 2008, a law was enacted to promote and encourage the use of solar thermal energy. This measure will require the installation of solar thermal water heaters in residences constructed after January 1, 2010, but allow for limited variances in cases where installation of solar water heating is deemed inappropriate. The measure will establish standards for quality and performance of such systems. Also in 2008, a law was enacted that is intended to facilitate the permitting of larger (200 MW or greater) renewable energy projects. The Energy Agreement includes several undertakings by the utilities to integrate solar energy into the electric grid.

Biofuels. In 2007, a law was enacted with the stated purpose of encouraging further production and use of biofuels in Hawaii. It established that biofuel processing facilities in Hawaii are a permitted use in designated agricultural districts and established a program with the Hawaii Department of Agriculture to encourage the production in Hawaii of energy feedstock (i.e., raw materials for biofuels).

In 2008, a law was enacted that encourages the development of biofuels by authorizing the Hawaii Board of Land and Natural Resources to lease public lands to growers or producers of plant and animal material used for the production of biofuels.

The utilities have agreed in the Energy Agreement to test the use of biofuels in their generating units and, if economically feasible, to connect them to the use of biofuels. For its part, the State agrees to support this testing and conversion by expediting all necessary approvals and permitting. The Energy Agreement recognizes that, if such conversion is possible, HECO’s requirements for biofuels would encourage the development of a local biofuels industry.

Suspension of Hawaii capital goods excise tax credit. Act 178, which became law on July 15, 2009, temporarily suspended the Hawaii capital goods excise tax credit for property placed in service between May 1 and December 31, 2009. This credit is a 4% investment credit on depreciable tangible personal property placed into service in Hawaii. This suspension of the credit could increase HECO’s consolidated current income tax liability by as much as $6 million, depending on the property placed in service during the suspension period. Since these tax credits are deferred and amortized over the expected lives of the properties, the annual net income impact of losing these credits would be significantly lower and is estimated to be $0.2 million per year for the next 30 years.

For a discussion of environmental legislation and regulations, see “Environmental regulation” in Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

At this time, it is not possible to predict with certainty the impact of the foregoing legislation or legislation that is, or may in the future be, proposed.

### Other developments

Advanced Meter Infrastructure (AMI). On December 1, 2008, the utilities filed an AMI project application with the PUC for approval to implement AMI, covering approximately 451,000 meters (293,000 on Oahu, 92,000 on the island of Hawaii and 66,000 on Maui). The application embodies the goals of the HCEI, which is further described in Note 5 of HECO’s “Notes to Consolidated Financial Statements.” The parties to the proceeding filed a proposed stipulated procedural order, which includes hearings in September 2009 and was approved in April 2009.

The AMI project application includes a request to approve a contract between Sensus Meter Systems, Inc. and HECO under which HECO, MECO and HELCO would purchase smart meters and pay Sensus to provide and maintain an AMI system to operate the smart meters. By its terms, either party may declare the contract null and void if it is not approved by a PUC D&O issued by November 30, 2009. Currently, the PUC procedural schedule for review of the application indicates that the PUC may not issue a D&O on the application by November 30, 2009.

HECO continues to operate a Sensus AMI network, currently consisting of 8,000 advanced meters at both residential and commercial customer sites on Oahu, and gathered additional data regarding commercially-available Meter Data Management (MDM) software. The utilities plan to issue an RFP for MDM software by the end of 2009. The MDM will ultimately capture the increased data volume from advanced meters and will serve as the data warehouse and knowledge store for current and future utility applications, and integrate with the utilities’ Customer Information System.

AMI technology enables automated meter reading, improved field service operations, more accurate meter readings, time-of-use pricing and conservation options for HECO customers. The utilities are developing a Smart Grid roadmap and are exploring other utility applications such as distribution circuit monitoring and water heater and air conditioning load control for improved residential and commercial customer reliability and renewables support. AMI technology is rapidly evolving and has become an integral part of the utilities’ Smart Grid planning.

***Commitments and contingencies***. See Note 5 of HECO’s “Notes to Consolidated Financial Statements.”

***Recent accounting pronouncements and interpretations***. See Note 7 of HECO’s “Notes to Consolidated Financial Statements.”

### FINANCIAL CONDITION

### Liquidity and capital resources

Despite the recent unprecedented deterioration in the capital markets and tightening of credit, HECO believes that its ability, and that of its subsidiaries, to generate cash, both internally from operations and externally from issuances of equity and debt securities, commercial paper and lines of credit, is adequate to maintain sufficient liquidity to fund their capital expenditures and investments and to cover debt, retirement benefits and other cash requirements in the foreseeable future.

HECO’s consolidated capital structure was as follows as of the dates indicated:

*(in millions)*

|  | June 30, 2009 |  | December 31, 2008 |  |
| --- | ---: | ---: | ---: | ---: |
| Short-term borrowings | $101 | 5% | $42 | 2% |
| Long-term debt | 908 | 41 | 905 | 42 |
| Cumulative preferred stock | 22 | 1 | 22 | 1 |
| Noncontrolling interest – cumulative preferred stock of subsidiaries | 12 | — | 12 | — |
| Common stock equity | 1,197 | 53 | 1,189 | 55 |
|  | $2,240 | 100% | $2,170 | 100% |

As of August 1, 2009, the S&P and Moody’s ratings of HECO securities were as follows:

|  | S&P |  | Moody’s |  |
| --- | --- | --- | --- | --- |
| Commercial paper | A-3 |  | P-2 |  |
| Special purpose revenue bonds-insured |  |  |  |  |
| (principal amount noted in parentheses, senior unsecured, insured as follows): |  |  |  |  |
| Ambac Assurance Corporation ($0.2 billion) | BBB | \* | Baa1 | \* |
| Financial Guaranty Insurance Company ($0.3 billion) | BBB | \* | Baa1 | \* |
| MBIA Insurance Corporation ($0.3 billion) | A | \*\* | Baa1 | \*\* |
| Syncora Guarantee Inc. (formerly XL Capital Assurance Inc.) ($0.1 billion) | BBB | \* | Baa1 | \* |
| Special purpose revenue bonds – uninsured ($150 million) | BBB |  | Baa1 |  |
| HECO-obligated preferred securities of trust subsidiary | BB+ |  | Baa2 |  |
| Cumulative preferred stock (selected series) | Not rated |  | Baa3 |  |

The above ratings reflect only the view of the applicable rating agency at the time the ratings are issued, from whom an explanation of the significance of such ratings may be obtained. Such ratings are not recommendations to buy, sell or hold any securities; such ratings may be subject to revision or withdrawal at any time by the rating agencies; and each rating should be evaluated independently of any other rating. HECO’s overall S&P corporate credit rating is BBB/Negative/A-3. HECO’s issuer rating by Moody’s is Baa1 and Moody’s outlook for HECO is “negative.”

\* Rating corresponds to HECO’s rating (senior unsecured debt rating by S&P or issuer rating by Moody’s) because, as a result of rating agency actions to lower or withdraw the ratings of these bond insurers after the bonds were issued, HECO’s current ratings are either higher than the current rating of the applicable bond insurer or the bond insurer is not rated.

\*\* Following MBIA’s announced restructuring in February 2009, the revenue bonds issued for HECO and its subsidiaries and insured by MBIA have been reinsured by MBIA Insurance Corp. of Illinois (MBIA Illinois), whose name was subsequently changed to National Public Finance Guarantee Corp. (National). The financial strength rating of National by S&P is A. Moody’s ratings on securities that are guaranteed or “wrapped” by a financial guarantor are generally maintained at a level equal to the higher of the rating of the guarantor (if rated at the investment grade level) or the published underlying rating. The insurance financial strength rating of National by Moody’s is Baa1, which is the same as Moody’s issuer rating for HECO.

The rating agencies use a combination of qualitative measures (e.g., assessment of business risk that incorporates an analysis of the qualitative factors such as management, competitive positioning, operations, markets and regulation) as well as quantitative measures (e.g., cash flow, debt, interest coverage and liquidity ratios) in determining the ratings of HECO securities. In May 2009, S&P revised HECO’s outlook to negative from stable, and lowered HECO’s short-term rating to “A-3” from “A-2.” S&P indicated the rating actions reflected its view that the next two years are likely to be challenging for HEI’s electric utilities. S&P stated that the deterioration in the Hawaii economy is likely to weaken 2009 and 2010 consolidated metrics, which it observed have been only marginally supportive of the “BBB” corporate credit ratings currently assigned to HECO. In July 2009, S&P issued a bulletin which stated “the interim ruling July 2 in Hawaiian Electric Co. Inc.’s (HECO; BBB/Negative/A-3) rate case and a recently announced delay in the company’s rate case hearings is adverse for credit quality but is adequately captured in the negative outlook assigned to the ratings last month.”

S&P designates business risk profiles as “excellent,” “strong,” “satisfactory,” “fair,” “weak” or “vulnerable.” S&P’s financial risk designations are “minimal,” “modest,” “intermediate,” “significant,” “aggressive” and “highly leveraged.” In August 2009, S&P listed HECO’s business risk profile as “strong” and financial risk profile as “significant.”

On July 20, 2009, Moody’s issued a news release in which it indicated it had changed HECO’s rating outlook to negative from stable, affirmed HECO’s long-term and short-term (commercial paper) ratings, and assigned a Baa1 rating to the $150 million senior unsecured SPRBs due 2039 that were subsequently issued on July 30, 2009 by the Department of Budget and Finance of the State of Hawaii (DBF) for the benefit of HECO and HELCO. See discussion below regarding the negative outlook and rating affirmation.

Subsequently on August 3, 2009, Moody’s issued a credit opinion on HECO. Moody’s indicated that the rating affirmation reflects the fact that notwithstanding the issues outlined in the credit opinion, the utilities’ financial metrics are reasonably positioned in its rating category. Regarding the negative rating outlook, Moody’s indicated that “HECO’s negative rating outlook reflects the impact of a weakened economy that is affecting electric demand and electric sales resulting in weaker financial performance, which may be influencing the outcome of state regulatory decisions, at a time when the company’s capital investment program is substantial.” Moody’s stated that “\[t\]he rating could be downgraded should weaker than expected regulatory support emerge at HECO or if the economy worsens materially more than anticipated causing earnings and sustainable cash flows to suffer.” Consequently, if the utilities’ financial ratios declined on a permanent basis such that FFO (Funds From Operations defined as net cash flow from operations less net changes in working capital items) to Adjusted Debt falls below 17% (17% last twelve months as of March 31, 2009-latest reported by Moody’s) or FFO to Adjusted Interest declines to less than 3.5x (3.6x last twelve months as of March 31, 2009-latest reported by Moody’s) for an extended period, the rating could be lowered.

Information about HECO’s short-term borrowings (other than from MECO), HECO’s line of credit facilities and special purpose revenue bonds authorized by the Hawaii legislature for issuance for the benefit of the utilities was as follows:

*(in millions)*

| Short-term borrowings | Six months ended June 30, 2009 Average balance | End-of-period balance |  | December 31, 2008 |
| --- | ---: | ---: | ---: | ---: |
| Commercial paper | $1 | $— |  | $— |
| Line of credit draws | 6 | 55 |  | — |
| Borrowings from affiliates | 31 | 46 |  | 42 |
| Line of credit facilities 1 |  |  |  |  |
| Undrawn capacity under line of credit facility expiring March 31, 2011 2 |  | 120 |  | 175 |
| Undrawn capacity under line of credit facility expiring September 8, 2009 3 |  | 75 |  | 75 |
| **Special purpose revenue bonds authorized for issue** |  |  |  |  |
| 2005 legislative authorization (expiring June 30, 2010)-HELCO |  | $20 |  | $20 |
| 2007 legislative authorization (expiring June 30, 2012) |  |  |  |  |
| HECO |  | 260 | 4 | 260 |
| HELCO |  | 115 | 4 | 115 |
| MECO |  | 25 |  | 25 |
| Total special purpose revenue bonds available for issue |  | $420 |  | $420 |

1 At August 1, 2009, there was no outstanding commercial paper balance and outstanding short-term borrowings under the credit facility expiring on March 31, 2011 totaled $80 million. HECO may seek to modify the credit facility expiring March 31, 2011 in accordance with the expedited approval process approved by the PUC, including to increase the amount of credit available under an agreement, and/or to enter into new lines of credit, as management deems appropriate.

2 In April 2009, HECO filed with the PUC a request for expedited approval of Amendment No. 2 (which the “Required Lenders,” as defined in the agreement, signed) to the $175 million credit facility. Among other things, Amendment No. 2 eliminates from the credit agreement representations relating to the funded status of HECO’s pension plan, which were not correct. On May 26, 2009, the PUC approved the Amendment No. 2.

3 On August 4, 2009, the $75 million credit facility terminated in accordance with its terms based on the completion on July 30, 2009 of the $150 million SPRB offering for the benefit of HECO and HELCO.

4 Authorization amounts for HECO and HELCO are reduced to $170 million and $55 million, respectively, as a result of the issuance of $150 million of Series 2009 SPRBs on July 30, 2009 by the Department of Budget and Finance of the State of Hawaii for the benefit of HECO ($90 million) and HELCO ($60 million).

HECO utilizes short-term debt, typically commercial paper, to support normal operations and for other temporary requirements. In June 2009, HECO began drawing on the credit facility expiring March 31, 2011, rather than issuing commercial paper. HECO also borrows short-term from HEI for itself and on behalf of HELCO and MECO, and HECO may borrow from or loan to HELCO and MECO short-term. The intercompany borrowings among the utilities, but not the borrowings from HEI, are eliminated in the consolidation of HECO’s financial statements. At June 30, 2009, HECO had $46 million and $19 million of short-term borrowings from HEI and MECO, respectively, and HELCO had $79 million of short-term borrowings from HECO. HECO had an average outstanding balance of commercial paper for the first six months of 2009 of $1 million and had no commercial paper outstanding at June 30, 2009. Due to market conditions since September 2008 which resulted in a tightening of the commercial paper (CP) market, escalating CP rates and limitations on maturity options as well as a result of S&P’s recent downgrade of HECO’s short-term borrowing rating to A-3 from A-2, HECO began drawing on its $175 million syndicated line of credit facility in June 2009, rather than issuing commercial paper. Management believes that, if HECO’s commercial paper ratings were to be further downgraded or if credit markets were to further tighten, it would be even more difficult and expensive to sell commercial paper or make other short-term borrowings.

Revenue bonds are issued by the DBF to finance capital improvement projects of HECO and its subsidiaries, but the source of their repayment are the unsecured obligations of HECO and its subsidiaries under loan agreements and notes issued to the DBF, including HECO’s guarantees of its subsidiaries’ obligations. The payment of principal and interest due on all revenue bonds outstanding as of June 30, 2009 are insured either by Ambac Assurance Corporation (Ambac), Financial Guaranty Insurance Company (FGIC), MBIA Insurance Corporation (MBIA) or Syncora Guarantee Inc. (Syncora) (formerly XL Capital Assurance Inc.). The insured outstanding revenue bonds were initially issued with S&P and Moody’s ratings of AAA and Aaa, respectively, based on the ratings at the time of issuance of the applicable bond insurer. Beginning in 2008, however, ratings of Ambac, MBIA, FGIC and XLCA (now Syncora) were downgraded and/or withdrawn by S&P and Moody’s resulting in a downgrade of the bond ratings of all of the bonds as shown in the ratings table above. The $150 million of SPRBs sold by the DBF for the benefit of HECO and HELCO on July 30, 2009, were sold without bond insurance. Management believes that if HECO’s long-term credit ratings were to be downgraded, or if credit markets further tighten, it could be even more difficult and/or expensive to sell bonds in the future.

Operating activities provided $127 million in net cash during the first six months of 2009. Investing activities during the same period used net cash of $170 million for capital expenditures, net of contributions in aid of construction. Financing activities for the same period provided net cash of $39 million, primarily due to a $59 million net increase in short-term borrowings and drawdown of $3 million of SPRB proceeds, partly offset by the payment of $22 million of common and preferred dividends and a $1 million decrease in cash overdraft.

The PUC must approve issuances, if any, of equity and long-term debt securities by HECO, HELCO and MECO. In October 2008, HECO, HELCO and MECO filed an application with the PUC for approval of one or more SPRB financings under the 2007 legislative authorization identified in the table above (up to $260 million for HECO, up to $115 million for HELCO, and up to $25 million for MECO). On June 29, 2009, the PUC granted the approvals necessary to permit the electric utilities to borrow the proceeds from the issuance of the SPRBs in the amounts requested. On July 30, 2009, the DBF issued (pursuant to the 2007 legislative authorization), at par, Series 2009 SPRBs in the aggregate principal amount of $150 million, which bonds are uninsured, with a maturity of July 1, 2039 and a fixed coupon interest rate of 6.50%, and loaned the proceeds to HECO ($90 million) and HELCO ($60 million). As of June 30, 2009, HECO’s consolidated current liabilities exceeded current assets by $138 million, but the proceeds from the recently-issued SPRBs were used to reimburse the electric utilities for their previously incurred capital expenditures and, in turn, are expected to be used principally to repay short-term borrowings and thus help to improve HECO’s working capital position. On April 20, 2009, HECO, HELCO and MECO filed with the PUC an application for the approval of the sale of each company’s common stock (HECO’s sale to HEI of up to $120 million and HELCO’s and MECO’s sales to HECO of up to $30 million and $7 million, respectively), and the purchase of the HELCO and MECO common stock by HECO, all in 2009.

HECO’s consolidated 2009 gross capital expenditures are now estimated to be approximately $380 million, reflecting a $37 million increase from the 2009 gross capital expenditures included in the previous five-year (2009-2013) consolidated utility forecast of $1.6 billion. The increase primarily reflects the higher cost estimate for CIP CT-1.

### Bank

### RESULTS OF OPERATIONS

*(in thousands)*

|  | Three months ended June 30,% 2009 | 2008 | change | Primary reason(s) for significant change |
| --- | ---: | ---: | --- | --- |
| Revenues | $75,499 | $85,950 | (12) | Lower interest income primarily due to lower earning asset balances as a result of the balance sheet restructuring in June 2008 and lower yields on earning assets due to the lower interest rate environment, partly offset by higher noninterest income due to prior year losses on the sale of investment and mortgage-related securities resulting from the balance sheet restructuring |
| Operating income | 5,506 | (30,992) | NM | Higher noninterest income due to losses in 2008 on the sale of investment and mortgage-related securities resulting from the balance sheet restructuring and lower noninterest expense due to the loss on early extinguishment of debt from the balance sheet restructuring, partly offset by higher provision for loan losses and lower net interest income in 2009 |
| Net income | 4,021 | (18,093) | NM | Higher operating income due to charges for the balance sheet restructure in 2008 |

*(in thousands)*

|  | Six months ended June 30,% 2009 | 2008 | change | Primary reason(s) for significant change |
| --- | ---: | ---: | --- | --- |
| Revenues | $157,531 | $191,794 | (18) | Lower interest income primarily due to lower earning asset balances as a result of the balance sheet restructuring in June 2008 and lower yields on earning assets due to the lower interest rate environment, partly offset by higher noninterest income due to prior year losses on the sale of investment and mortgage-related securities resulting from the balance sheet restructuring |
| Operating income | 22,627 | (7,629) | NM | Higher noninterest income due to losses in 2008 on the sale of investment and mortgage-related securities resulting from the balance sheet restructuring and lower noninterest expense due to the loss on early extinguishment of debt from the balance sheet restructuring, partly offset by higher provision for loan losses and lower net interest income in 2009 |
| Net income | 14,903 | (3,517) | NM | Higher operating income due to charges for the balance sheet restructure in 2008 |

See “Economic conditions” in the “HEI Consolidated” section above.

***Average balance sheet and net interest margin.*** The following tables set forth average balances, together with interest and dividend income earned and accrued, and resulting yields and costs for the three and six months ended June 30, 2009 and 2008. The average balances for investment and mortgage-related securities and other borrowings were lower due to the balance sheet restructuring in June 2008. The average rate for other borrowings was also impacted by the balance sheet restructure.

*($ in thousands)*

| Assets: | Three months ended June 30 2009 Average Balance Interest Average Rate (%) | 2008 Average Balance Interest Average Rate (%) |
| --- | ---: | ---: |
| Other investments 1 | $228,623 $55 0.09 | $146,822 $585 1.59 |
| Investment and mortgage-related securities | 643,152 7,088 4.41 | 1,940,258 22,144 4.57 |
| Loans receivable 2 | 3,979,321 55,363 5.57 | 4,167,696 61,747 5.93 |
| Total interest-earning assets | 4,851,096 62,506 5.16 | 6,254,776 84,476 5.40 |
| Allowance for loan losses | (43,617) | (30,034) |
| Non-interest-earning assets | 330,398 | 405,505 |
| Total assets | $5,137,877 | $6,630,247 |
| Liabilities and Stockholder’s Equity: |  |  |
| Interest-bearing demand and savings deposits | $2,200,413 1,798 0.33 | $2,110,933 2,810 0.53 |
| Time certificates | 1,236,328 8,104 2.63 | 1,496,224 12,809 3.43 |
| Total interest-bearing deposits | 3,436,741 9,902 1.16 | 3,607,157 15,619 1.74 |
| Other borrowings | 404,521 2,241 2.20 | 1,643,441 16,265 3.96 |
| Total interest-bearing liabilities | 3,841,262 12,143 1.27 | 5,250,598 31,884 2.43 |
| Non-interest bearing liabilities: |  |  |
| Deposits | 737,219 | 687,168 |
| Other | 88,192 | 105,268 |
| Stockholder’s equity | 471,204 | 587,213 |
| Total Liabilities and Stockholder’s Equity | $5,137,877 | $6,630,247 |
| Net interest income | $50,363 | $52,592 |
| Net interest margin (%) 3 | 4.16 | 3.36 |
|  | **Six months ended June 30** |  |
|  | **2009** | **2008** |
| **($ in thousands)** | **Average Balance** **Interest** **Average Rate (%)** | **Average Balance** **Interest** **Average Rate (%)** |
| Assets: |  |  |
| Other investments 1 | $168,206 $55 0.06 | $142,070 $1,146 1.61 |
| Investment and mortgage-related securities | 659,449 14,764 4.48 | 2,041,192 46,034 4.51 |
| Loans receivable 2 | 4,077,634 113,455 5.58 | 4,166,851 125,212 6.01 |
| Total interest-earning assets | 4,905,289 128,274 5.24 | 6,350,113 172,392 5.43 |
| Allowance for loan losses | (39,961) | (30,035) |
| Non-interest-earning assets | 344,741 | 416,986 |
| Total assets | $5,210,069 | $6,737,064 |
| Liabilities and Stockholder’s Equity: |  |  |
| Interest-bearing demand and savings deposits | $2,160,417 4,145 0.39 | $2,104,271 6,317 0.60 |
| Time certificates | 1,281,392 17,322 2.73 | 1,536,978 27,522 3.59 |
| Total interest-bearing deposits | 3,441,809 21,467 1.26 | 3,641,249 33,839 1.86 |
| Other borrowings | 482,411 5,505 2.27 | 1,724,717 35,414 4.11 |
| Total interest-bearing liabilities | 3,924,220 26,972 1.38 | 5,365,966 69,253 2.59 |
| Non-interest bearing liabilities: |  |  |
| Deposits | 725,922 | 671,157 |
| Other | 86,783 | 106,603 |
| Stockholder’s equity | 473,144 | 593,338 |
| Total Liabilities and Stockholder’s Equity | $5,210,069 | $6,737,064 |
| Net interest income | $101,302 | $103,139 |
| Net interest margin (%) 3 | 4.13 | 3.25 |

1 Includes federal funds sold, interest bearing deposits and stock in the FHLB of Seattle ($98 million as of June 30, 2009).

2 Includes loan fees of $1.9 million and $1.3 million for the three months ended June 30, 2009 and 2008, respectively, $3.8 million and $2.4 million for the six months ended June 30, 2009 and 2008, respectively together with interest accrued prior to suspension of interest accrual on nonaccrual loans. Includes nonaccrual loans.

3 Defined as net interest income as a percentage of average earning assets.

***Earning assets, costing liabilities and other factors.*** Earnings of ASB depend primarily on net interest income, which is the difference between interest earned on earning assets and interest paid on costing liabilities. The current interest rate environment is very volatile due to disruptions in the financial markets and these conditions may have a negative impact on ASB’s net interest margin.

Loan originations and purchases of loans and mortgage-related securities are ASB’s primary sources of earning assets.

*Loan portfolio*. ASB’s loan volumes and yields are affected by market interest rates, competition, demand for financing, availability of funds and management’s responses to these factors. The following table sets forth the composition of ASB’s loan portfolio as of the dates indicated:

*(dollars in thousands)*

| Real estate loans: | June 30, 2009 Balance | % of total | December 31, 2008 Balance | % of total |
| --- | ---: | ---: | ---: | ---: |
| Residential 1-4 family | $2,482,820 | 63.7 | $2,808,611 | 66.2 |
| Commercial real estate | 261,000 | 6.7 | 242,952 | 5.7 |
| Home equity line of credit | 300,966 | 7.7 | 272,505 | 6.4 |
| Residential land | 115,638 | 3.0 | 126,963 | 3.0 |
| Commercial construction | 54,720 | 1.4 | 71,518 | 1.7 |
| Residential construction | 29,164 | 0.8 | 34,458 | 0.8 |
| Total real estate loans, net | 3,244,308 | 83.3 | 3,557,007 | 83.8 |
| Commercial | 580,478 | 14.9 | 594,677 | 14.0 |
| Consumer | 70,341 | 1.8 | 90,606 | 2.2 |
|  | 3,895,127 | 100.0 | 4,242,290 | 100.0 |
| Less: Allowance for loan losses | 42,522 |  | 35,798 |  |
| Total loans, net | $3,852,605 |  | $4,206,492 |  |

The decrease in the total loan portfolio during the first six month of 2009 was primarily due to ASB’s strategic decision to sell all salable residential loans in the current low interest rate environment.

*Loan portfolio risk elements*. When a borrower fails to make a required payment on a loan and does not cure the delinquency promptly, the loan is classified as delinquent. If delinquencies are not cured promptly, ASB normally commences a collection action, including foreclosure proceedings in the case of secured loans. In a foreclosure action, the property securing the delinquent debt is sold at a public auction in which ASB may participate as a bidder to protect its interest. If ASB is the successful bidder, the property is classified as real estate owned until it is sold.

The following table sets forth certain information with respect to nonperforming assets as of the dates indicated:

*(dollars in thousands)*

| Real estate loans: | June 30, 2009 | December 31, 2008 |
| --- | ---: | ---: |
| Residential 1-4 family | $23,927 | $7,335 |
| Commercial real estate | 284 | — |
| Home equity line of credit | 2,218 | 716 |
| Residential land | 18,658 | 7,458 |
| Commercial construction | — | — |
| Residential construction | — | 189 |
|  | 45,087 | 15,698 |
| Commercial | 11,957 | 2,801 |
| Consumer | 493 | 488 |
| Total nonperforming loans | 57,537 | 18,987 |
| Real estate owned: |  |  |
| Residential 1-4 family | 533 | — |
| Residential land | 2,420 | 1,492 |
| Total real estate owned loans | 2,953 | 1,492 |
| Total nonperforming assets | $60,490 | $20,479 |
| Nonperforming assets to total loans and REO | 1.55% | 0.48% |

The increase in nonperforming loans was primarily due to higher amounts of residential first mortgage and land loans and commercial loans that are 90 days or more past due.

*Allowance for loan losses*. The following table sets forth the allocation of ASB’s allowance for loan losses and the percentage of loans in each category to total loans as of the dates indicated:

*(dollars in thousands)*

| Real estate loans: | June 30, 2009 Balance | % of total | December 31, 2008 Balance | % of total |
| --- | ---: | ---: | ---: | ---: |
| Residential 1-4 family | $8,949 | 63.7 | $4,024 | 66.2 |
| Commercial real estate | 3,500 | 8.1 | 3,977 | 7.4 |
| Home equity line of credit | 2,680 | 7.7 | 548 | 6.4 |
| Residential land | 5,783 | 3.0 | 1,953 | 3.0 |
| Residential construction | 269 | 0.8 | 88 | 0.8 |
| Total real estate loans, net | 21,181 | 83.3 | 10,590 | 83.8 |
| Commercial | 18,188 | 14.9 | 22,294 | 14.0 |
| Consumer | 2,525 | 1.8 | 2,190 | 2.2 |
|  | 41,894 | 100.0 | 35,074 | 100.0 |
| Unallocated | 628 |  | 724 |  |
| Total allowance for loan losses | $42,522 |  | $35,798 |  |

The increase in the allowance for loan losses was primarily due to higher residential first mortgage and land loans and home equity lines of credit delinquencies, offset by the partial charge-off of a commercial credit.

*Investment and mortgage-related securities*. As of June 30, 2009, the bank’s investment portfolio consisted of 52% mortgage-related securities issued by Federal National Mortgage Association (FNMA), Federal Home Loan Mortgage Corporation (FHLMC) or Government National Mortgage Association (GNMA), 42% private-issue mortgage-related securities, 5% federal agency obligations and 1% municipal bonds. As of December 31, 2008, the bank’s investment portfolio consisted of 9% federal agency obligations, 46% mortgage-related securities issued by FNMA, FHLMC or GNMA and 45% private-issue mortgage-related securities.

Principal and interest on mortgage-related securities issued by FNMA, FHLMC and GNMA are guaranteed by the issuer, and the securities carry implied AAA ratings. Private-issue mortgage-related securities carry a risk of loss due to delinquencies, foreclosures, and losses in the mortgage loans collateralizing the securities. Further deterioration in the U.S. residential housing market continues to pressure the private-issue mortgage-related securities held in the investment portfolio. The velocity of economic decline has exacerbated already weak home sales, which are impacted by borrowers unable to secure financing but also by those defaulting on current loans as a result of unemployment trends or payment shocks. The flood of inventory as a result of foreclosures has pressured prices and thus the credit of securities held in the portfolio. Those originated within the last 2-3 years have experienced the greatest pressure as borrowers purchasing homes at the peak of the market have experienced price declines that have eroded any remaining equity in their properties. As of June 30, 2009, private-issue mortgage-related securities represented 42% of the portfolio. 20% of the portfolio was rated non-investment grade by at least one of the major rating agencies. While the majority of those securities are backed by prime, fixed rate, 30 year mortgages, price declines coupled with increased economic pressure have impacted all sectors of the housing market which has impacted credit ratings of securities backed by loans issued within the last couple of years.

The table below summarizes the private-issue mortgage-related securities by credit rating and year of issuance.

*(in thousands)*

| June 30, 2009 Private-issue mortgage-related securities 1 Prime – year of issuance: | Book value AAA/Aaa | AA+/AA/ AA- | A+/A/A- | BBB/Baa | BB+/BB/ BB- | B/B- | CCC+/ CCC |  | CC/Ca |  | Total | Net unrealized loss |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| 2003 and earlier | $41,068 | $261 | $2,553 | $— | $63 | $— | $— |  | $— |  | $43,945 | $(2,377) |
| 2004 | 34,925 | — | — | — | — | — | — |  | — |  | 34,925 | (806) |
| 2005 | 36,600 | — | 10,497 | 8,544 | 12,955 | 13,404 | — |  | — |  | 82,000 | (8,571) |
| 2006 | — | — | — | 7,328 | 6,404 | 11,734 | 33,398 |  | 12,019 | 2 | 70,883 | (16,118) |
| 2007 | — | — | — | — | — | — | 13,374 | 3 | — |  | 13,374 | (832) |
| Total prime | 112,593 | 261 | 13,050 | 15,872 | 19,422 | 25,138 | 46,772 |  | 12,019 |  | 245,127 | (28,704) |
| Alt-A – year of issuance: |  |  |  |  |  |  |  |  |  |  |  |  |
| 2005 | — | — | — | — | 12,132 | — | — |  | — |  | 12,132 | (3,144) |
| 2006 | — | — | — | — | — | — | 13,775 | 4 | — |  | 13,775 | (6,047) |
| Total Alt-A | — | — | — | — | 12,132 | — | 13,775 |  | — |  | 25,907 | (9,191) |
| Sub-prime – year of issuance: |  |  |  |  |  |  |  |  |  |  |  |  |
| 1999 and earlier | — | — | 1,496 | — | 2,488 | — | — |  | — |  | 3,984 | (2,108) |
| Total sub-prime | — | — | 1,496 | — | 2,488 | — | — |  | — |  | 3,984 | (2,108) |
|  | $112,593 | $261 | $14,546 | $15,872 | $34,042 | $25,138 | $60,547 |  | $12,019 |  | $275,018 | $(40,003) |

1 All issues categorized by lowest available rating by Nationally Recognized Statistical Rating Organizations.

2 Includes one issue rated “Ca” by Moody’s, with a realized OTTI credit loss of $2.1 million.

3 Includes one issue rated “CCC” by Fitch, with a realized OTTI credit loss of $3.4 million.

4 Includes one issue rated “Caa1” by Moody’s, with a realized OTTI credit loss of $0.1 million.

*December 31, 2008*

*(in thousands)*

| Private-issue mortgage-related securities 1 Prime – year of issuance: | Book value AAA/Aaa | AA/Aa |  | A | BBB/Baa | BB+/Ba | B |  | Total | Net unrealized loss |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| 2003 and earlier | $54,062 | $300 | 2 | $2,732 | $66 | $— | $— |  | $57,160 | $(3,737) |
| 2004 | 62,356 | — |  | — | — | — | — |  | 62,356 | (4,089) |
| 2005 | 100,061 | — |  | — | — | — | — |  | 100,061 | (14,950) |
| 2006 | — | — |  | 22,415 | 45,334 | 4,321 | 15,682 |  | 87,752 | (25,429) |
| 2007 | — | — |  | — | — | — | 12,042 | 3 | 12,042 | — |
| Total prime | 216,479 | 300 |  | 25,147 | 45,400 | 4,321 | 27,724 |  | 319,371 | (48,205) |
| Alt-A – year of issuance: |  |  |  |  |  |  |  |  |  |  |
| 2005 | — | — |  | 13,722 | — | — | — |  | 13,722 | (3,315) |
| 2006 | — | — |  | — | — | 14,300 | — |  | 14,300 | (5,921) |
| Total Alt-A | — | — |  | 13,722 | — | 14,300 | — |  | 28,022 | (9,236) |
| Sub-prime – year of issuance: |  |  |  |  |  |  |  |  |  |  |
| 1999 and earlier | — | — |  | 1,623 | — | 2,488 | — |  | 4,111 | (1,753) |
| Total sub-prime | — | — |  | 1,623 | — | 2,488 | — |  | 4,111 | (1,753) |
|  | $216,479 | $300 |  | $40,492 | $45,400 | $21,109 | $27,724 |  | $351,504 | $(59,194) |

1 All issues categorized by lowest available rating by Nationally Recognized Statistical Rating Organizations.

2 Includes one issue rated “Aa2” by Moody’s, with a realized OTTI loss of $0.2 million.

3 Includes one issue rated “B” by S&P, with a realized OTTI loss of $7.6 million.

Should market conditions and the performance of mortgage-related assets continue to deteriorate, ASB could incur additional material OTTI charges.

*Deposits and other borrowings*. Deposits continue to be the largest source of funds for ASB and are affected by market interest rates, competition and management’s responses to these factors. Deposit retention and growth will remain challenges in the current environment due to competition for deposits and the level of short-term interest rates. Advances from the FHLB of Seattle and securities sold under agreements to repurchase continue to be additional sources of funds. As of June 30, 2009, ASB’s costing liabilities consisted of 91% deposits and 9% other borrowings. As of December 31, 2008, ASB’s costing liabilities consisted of 86% deposits and 14% other borrowings.

*Other factors*. Interest rate risk is a significant risk of ASB’s operations and also represents a market risk factor affecting the fair value of ASB’s investment securities. Increases and decreases in prevailing interest rates generally translate into decreases and increases in fair value of those instruments. In addition, changes in credit spreads also impact the fair values of those instruments. Continued deterioration in the housing market has amplified the credit risks in ASB’s private-issue mortgage-related securities holdings. Although most of the bonds are senior securities which were underwritten to be the shortest duration instruments in the deal structure, further deterioration in the housing market may negatively impact the outstanding credit enhancement of these positions. Continued deterioration in pools supporting ASB’s securities will adversely impact their value. While current AOCI deficits are considered temporary, greater declines in the housing market may negatively impact their valuation and result in “other-than-temporary” losses that are material.

Although higher long-term interest rates or other conditions in credit markets (such as the effects of the deteriorated subprime market) could reduce the market value of available-for-sale investment and mortgage-related securities and reduce stockholder’s equity through a balance sheet charge to AOCI, this reduction in the market value of investments and mortgage-related securities would not result in a charge to net income in the absence of a sale of such securities (such as those that occurred in the balance sheet restructure) or an “other-than-temporary” impairment in the value of the securities. As of June 30, 2009 and December 31, 2008, the unrealized losses, net of tax benefits, on available-for-sale investments and mortgage-related securities (including securities pledged for repurchase agreements) in AOCI was $20 million and $33 million, respectively. See “Quantitative and qualitative disclosures about market risk.”

***Results – three months ended June 30, 2009***. Net interest income before provision for loan losses for the second quarter of 2009 decreased by $2.2 million, or 4%, when compared to the same period in 2008 due to lower balances and yields on earning asset balances, partially offset by lower funding costs. Net interest margin increased from 3.36% in the second quarter of 2008 to 4.16% in the second quarter of 2009 due to the restructuring of the balance sheet, which removed lower spread net assets (investment and mortgage-related securities and other borrowings). The decrease in the average loan portfolio balance was due to a decrease in the average residential loan portfolio of $350 million as ASB continued to sell all salable residential loan production in the current low interest rate environment. Offsetting the decrease in the residential portfolio was growth in the home equity lines of credit and commercial markets loan portfolios. The decrease in the average investment and mortgage-related securities portfolios was primarily due to the sale of securities in the balance sheet restructure and repayments in the portfolio. See “Balance sheet restructure” in Note 4 to HEI’s “Notes to Consolidated Financial Statements.” Average deposit balances decreased by $120 million compared to the second quarter of 2008, and increased by $13 million compared to the first quarter of 2009. ASB experienced outflows throughout 2008 as the downward trend in interest rates made it difficult to retain deposits. The shift in deposit mix from higher cost certificates to lower cost savings and checking accounts, along with the repricing of deposits as a result of a downward movement in the general level of interest rates, has contributed to decreased funding costs. Average other borrowings decreased by $1.2 billion primarily due to the early extinguishment of other borrowings in the balance sheet restructure.

During the second quarter of 2009, ASB recorded a provision for losses of $13.5 million due to the partial charge-off of a commercial loan, higher nonperforming residential lot loans and higher delinquencies in residential and consumer loans. Higher levels of delinquencies and loan loss provisions are expected through the economic downturn. During the second quarter of 2008, ASB recorded a provision for losses of $1.2 million due to an increase in the classification of commercial loans.

Second quarter of 2009 noninterest income increased by $11.5 million when compared to the second quarter of 2008, primarily due to the loss on sale of mortgage-related securities and agency notes from the balance sheet restructuring in June 2008, partially offset by a charge for OTTI on three mortgage-related securities in the second quarter of 2009. Noninterest income for the second quarter of 2008 also included insurance recoveries on legal and litigation matters of $4.3 million and a $1.0 million gain on sale of stock in a membership organization.

Noninterest expense for the second quarter of 2009 decreased by $39.6 million when compared to the second quarter of 2008, primarily due to losses on the early extinguishment of certain borrowings from the balance sheet restructuring. Excluding the losses from the balance sheet restructuring in the second quarter of 2008, noninterest expense for the second quarter of 2009 increased by $0.2 million.

In the second quarter of 2009, ASB signed an agreement with Fiserv Inc. to use its technology to consolidate ASB’s disparate manual processes using a single, integrated approach. The change to the Fiserv Inc. bank platform system is projected to reduce service bureau expenses by an estimated $6 million annually, beginning in June 2010. To convert its existing systems to the Fiserv Inc. technology, ASB expects to incur conversion costs totaling approximately $3 million (to be incurred in the remainder of 2009 and the first half of 2010).

***Results – six months ended June 30, 2009***. Net interest income before provision for loan losses for the first six months of 2009 decreased by $1.8 million, or 2%, when compared to the same period in 2008 as lower funding costs were more than offset by lower balances and yields on loans and investment and mortgage-related securities. Net interest margin increased from 3.25% in the first six months of 2008 to 4.13% in the first six months of 2009 due to the restructuring of the balance sheet, which removed lower spread net assets (investment and mortgage-related securities and other borrowings). The decrease in the average loan portfolio balance was due to a decrease in the average residential loan portfolio of $277 million as ASB continued to sell all salable residential loan production in the current low interest rate environment. Offsetting the decrease in the residential portfolio was growth in the home equity lines of credit and commercial markets loan portfolios. The decrease in the average investment and mortgage-related securities portfolios was primarily due to the sale of securities in the balance sheet restructuring and paydowns in the portfolio. See “Balance sheet restructure” in Note 4 to HEI’s “Notes to Consolidated Financial Statements.” Average deposit balances decreased by $145 million compared to the first six months of 2008. ASB experienced outflows throughout 2008 as the downward trend in interest rates made it difficult to retain deposits. The shift in deposit mix from higher cost certificates to lower cost savings and checking accounts, along with the repricing of deposits as a result of a downward movement in the general level of interest rates, has contributed to decreased funding costs. Average other borrowings decreased by $1.2 billion primarily due to the early extinguishment of other borrowings in the balance sheet restructure.

During the first six months of 2009, ASB recorded a provision for losses of $21.8 million due to the classification and partial charge-off of a commercial credit, higher nonperforming residential lot loans and higher residential and consumer loan delinquencies. The increase in net charge-offs for the first six months of 2009 compared to the same period in 2008 was primarily due to the partial charge-off of the commercial credit and higher residential, consumer and small business loan charge-offs. Higher levels of delinquencies and loan loss provisions are expected through the economic downturn. During the first six months of 2008, ASB recorded a provision for losses of $2.1 million due to loan growth as well as an increase in the classification of commercial loans.

*(in thousands)*

|  | Six months ended June 30 2009 | 2008 | Year ended December 31 2008 |
| --- | ---: | ---: | ---: |
| Allowance for loan losses, January 1 | $35,798 | $30,211 | $30,211 |
| Provision for loan losses | 21,800 | 2,055 | 10,334 |
| Less: net charge-offs | 15,076 | 1,883 | 4,747 |
| Allowance for loan losses, end of period | $42,522 | $30,383 | $35,798 |
| Ratio of allowance for loan losses, end of period, to average loans outstanding | 1.04% | 0.73% | 0.86% |
| Ratio of net charge-offs during the period to average loans outstanding (annualized) | 0.74% | 0.09% | 0.11% |
| Nonaccrual loans | $60,773 | $8,232 | $19,494 |

The first six months of 2009 noninterest income increased by $9.9 million when compared to the first six months of 2008, primarily due to the loss on sale of mortgage-related securities and agency notes from the balance sheet restructuring in June 2008, partially offset by a charge for OTTI on three mortgage-related securities in the second quarter of 2009. Noninterest income for the first half of 2008 also included insurance recoveries on legal and litigation matters of $4.3 million and a $1.9 million gain on sale of stock in a membership organizations.

Noninterest expense for the six months ended June 30, 2009 decreased by $42.0 million when compared to the same period of 2008, primarily due to losses on the early extinguishment of certain borrowings from the balance sheet restructuring in the second quarter of 2008. Excluding the losses from the balance sheet restructuring, noninterest expense for the first six months of 2009 decreased by $2.1 million primarily due to lower legal and consulting expenses.

***Legislation and regulation.*** ASB is subject to extensive regulation, principally by the Office of Thrift Supervision (OTS) and the Federal Deposit Insurance Corporation (FDIC). Depending on its level of regulatory capital and other considerations, these regulations could restrict the ability of ASB to compete with other institutions and to pay dividends to its shareholders. See the discussion below under “Liquidity and capital resources.” Also see “FDIC restoration plan” and “Deposit insurance coverage” in Note 4 of HEI’s “Notes to Consolidated Financial Statements.”

On June 17, 2009, The Treasury Department released its financial regulatory reform proposal. The proposal, if adopted in its current form would eliminate the Office of Thrift Supervision (OTS) and the thrift charter. The proposal also identifies a number of so-called “loopholes” in the current regulatory framework that have allowed certain types of companies to control insured depository institutions without being subject to comprehensive holding company regulation by the Federal Reserve. Among these “loopholes” is the grandfathering treatment for certain companies that owned thrifts prior to 1999. HEI relies on this grandfathering treatment to conduct both electric utility and banking activities. The proposal states: “\[A\]lthough \[bank holding companies\] generally are prohibited from engaging in commercial activities, many thrift holding companies established before the GLB \[Gramm-Leach-Bliley\] Act in 1999 qualify as unitary thrift holding companies and are permitted to engage freely in commercial activities. Under our plan, all thrift holding companies would become \[bank holding companies\] and would be fully regulated on a consolidated basis.” The proposal indicates that such firms would be given five years to conform to the activity limits of the Bank Holding Company Act, such as by divesting their commercial affiliates. Currently, there is substantial uncertainty on the timing and final contents of regulatory reform, but management will continue to follow the proposal closely.

***FHLB of Seattle dividends.*** In December 2008, the FHLB of Seattle announced that it would not pay a dividend on its stock in the fourth quarter of 2008 due to a net loss reported by the FHLB of Seattle for the third quarter of 2008. The FHLB of Seattle also announced that it had a risk-based capital deficiency at December 31, 2008 and would not be able to repurchase capital stock or declare a dividend while a risk-based capital deficiency exists. In May 2009, the FHLB of Seattle reported a net loss for the first quarter of 2009 and continued to have a risk-based capital deficiency. ASB does not believe that the FHLB of Seattle’s risk-based capital deficiency will affect the FHLB of Seattle’s ability to meet ASB’s liquidity and funding needs. ASB received cash dividends on its $98 million of FHLB of Seattle stock of $0.1 million in 2006, $0.6 million in 2007 and $0.9 million in 2008.

Periodically and as conditions warrant, ASB reviews its investment in the stock of FHLB of Seattle for impairment. ASB evaluated its investment in FHLB stock for OTTI as of June 30, 2009, consistent with its accounting policy. Based on ASB’s evaluation of the underlying investment, including the long-term nature of the investment, the liquidity position of the FHLB of Seattle, the actions being taken by the FHLB of Seattle to address its regulatory capital situation and ASB’s intent and ability to hold the investment for a period of time sufficient to recover the par value, ASB did not recognize an OTTI loss during the six-months ended June 30, 2009. Continued deterioration in the FHLB of Seattle’s financial position may result in future impairment losses.

***Commitments and contingencies***. See Note 4 of HEI’s “Notes to Consolidated Financial Statements.”

***Recent accounting pronouncements and interpretations***. See Note 9 of HEI’s “Notes to Consolidated Financial Statements.”

### FINANCIAL CONDITION

### Liquidity and capital resources

*(in millions)*

|  | June 30, 2009 | December 31, 2008 | % change |
| --- | ---: | ---: | ---: |
| Total assets | $5,120 | $5,437 | (6) |
| Available-for-sale investment and mortgage-related securities | 622 | 658 | (5) |
| Investment in stock of FHLB of Seattle | 98 | 98 | — |
| Loans receivable, net | 3,853 | 4,206 | (8) |
| Deposit liabilities | 4,169 | 4,180 | — |
| Other bank borrowings | 389 | 681 | (43) |

As of June 30, 2009, ASB was one of Hawaii’s largest financial institutions based on assets of $5.1 billion and deposits of $4.2 billion.

In March 2007, Moody’s raised ASB’s counterparty credit rating to A3 from Baa3 and, in March 2009, changed ASB’s outlook to “negative” from “stable.” In April 2007, S&P raised ASB’s long-term/short-term counterparty credit ratings to BBB/A-2 from BBB-/A-3 and in May 2009 maintained the rating following its annual review of ASB. These ratings reflect only the view, at the time the ratings are issued, of the applicable rating agency, from whom an explanation of the significance of such ratings may be obtained. Such ratings are not recommendations to buy, sell or hold any securities; such ratings may be subject to revision or withdrawal at any time by the rating agencies; and each rating should be evaluated independently of any other rating.

As of June 30, 2009, ASB’s unused FHLB borrowing capacity was approximately $1.6 billion. As of June 30, 2009, ASB had commitments to borrowers for undisbursed loan funds, loan commitments and unused lines and letters of credit of $1.2 billion. Management believes ASB’s current sources of funds will enable it to meet these obligations while maintaining liquidity at satisfactory levels.

As of June 30, 2009 and December 31, 2008, ASB had $3.0 million and $1.5 million, respectively, of real estate acquired in settlement of loans.

For the first six months of 2009, net cash provided by ASB’s operating activities was $62 million. Net cash provided during the same period by ASB’s investing activities was $363 million, primarily due to a net decrease in loans receivable of $305 million and repayments of investment and mortgage-related securities of $248 million, partly offset by purchases of investment and mortgage-related securities of $190 million. Net cash used in financing activities during this period was $340 million, primarily due to net decreases in Federal Home Loan Bank advances, retail repurchase agreements, deposit liabilities and securities sold under agreements to repurchase of $263 million, $25 million, $11 million and $5 million, respectively, and the payment of $35 million in common stock dividends.

ASB believes that a satisfactory regulatory capital position provides a basis for public confidence, affords protection to depositors, helps to ensure continued access to capital markets on favorable terms and provides a foundation for growth. FDIC regulations restrict the ability of financial institutions that are not well-capitalized to compete on the same terms as well-capitalized institutions, such as by offering interest rates on deposits that are significantly higher than the rates offered by competing institutions. As of June 30, 2009, ASB was well-capitalized (minimum ratio requirements noted in parentheses) with a leverage ratio of 8.7% (5.0%), a Tier-1 risk-based capital ratio of 11.6% (6.0%) and a total risk-based capital ratio of 12.6% (10.0%). The OTS has approved ASB’s payment of quarterly dividends through the quarter ended June 30, 2009 to the extent that payment of the dividend would not cause ASB’s Tier I leverage ratio to fall below 8% as of the end of the quarter.

## Market risk

As filed, 5,324 characters.

Credit risk for ASB is the risk that borrowers or issuers of securities will not be able to repay their obligations to the bank. Credit risk associated with ASB’s lending portfolios is controlled through its underwriting standards, loan rating of commercial and commercial real estate loans, on-going monitoring by loan officers, credit review and quality control functions in these lending areas and adequate allowance for loan losses. Credit risk associated with the securities portfolio is mitigated through investment portfolio limits, experienced staff working with analytical tools, monthly fair value analysis and on-going monitoring and reporting such as investment watch reports and loss sensitivity analysis. Credit risk for ASB has risen as a result of the pronounced slowdown in the national and Hawaii economies and real estate markets. In Hawaii, the unemployment rate has increased, residential loan delinquencies have trended upward and bankruptcy filings have increased, resulting in the increased provision for loan losses in 2008 and the first half of 2009. Further, mortgage-related securities values have fallen, and ASB has taken OTTI charges in December 2008 and June 2009. See “Net interest margin and other factors” and “Results—six months ended June 30, 2009” above.

The Company considers interest-rate risk (a non-trading market risk) to be a very significant market risk for ASB as it could potentially have a significant effect on the Company’s financial condition and results of operations. For additional quantitative and qualitative information about the Company’s market risks, see pages 59 to 62, HEI’s Quantitative and qualitative disclosures about market risk, which is incorporated into Part II, Item 7A of HEI’s 2008 Form 10-K by reference to HEI Exhibit 13 to HEI’s Current Report on Form 8-K dated February 19, 2009.

ASB’s interest-rate risk sensitivity measures as of June 30, 2009 and December 31, 2008 constitute “forward-looking statements” and were as follows:

| Change in interest rates (basis points) | June 30, 2009 Change in NII Gradual change | NPV ratio Instantaneous change |  | NPV ratio sensitivity \* | December 31, 2008 Change in NII Gradual change | NPV ratio Instantaneous change | NPV ratio sensitivity \* |
| --- | ---: | ---: | --- | ---: | ---: | ---: | ---: |
| +300 | (0.2) | 8.55 |  | (313) | 1.2% | 6.94% | (379) |
| +200 | 0.1 | 9.70 |  | (198) | 1.2 | 8.42 | (231) |
| +100 | 0.2 | 10.83 |  | (85) | 0.7 | 9.84 | (89) |
| Base | — | 11.68 |  |  | — | 10.73 | — |
| -100 | (1.3) | 11.73 |  | 5 | (1.6) | 10.43 | (30) |
| -200 | \* \* | \* | \* | \* \* | \* \* | \* \* | \* \* |
| -300 | \* \* | \* | \* | \* \* | \* \* | \* \* | \* \* |

\* Change from base case in basis points (bp).

\*\* For June 30, 2009 and December 31, 2008, the -200 and -300 bp scenarios were not performed because they would have resulted in negative Treasury interest rates.

ASB’s net interest income (NII) sensitivity is less sensitive in the rising rate scenarios from December 31, 2008 to June 30, 2009 primarily due to the decrease in size and change in mix of the balance sheet and changes in assumptions about sensitivity to changes in rates.

ASB’s base net present value (NPV) ratio as of June 30, 2009 increased compared to December 31, 2008 primarily due to the decrease in size and change in mix of the balance sheet and changes in the level of interest rates.

ASB’s NPV ratio sensitivity measure as of June 30, 2009 is less sensitive in rising rate scenarios when compared to December 31, 2008 primarily due to changes in balance sheet mix.

The computation of the prospective effects of hypothetical interest rate changes on the NII sensitivity, NPV ratio, and NPV ratio sensitivity analyses is based on numerous assumptions, including relative levels of market interest rates, loan prepayments, balance changes and pricing strategies, and should not be relied upon as indicative of actual results (see page 60 of HEI Exhibit 13 to HEI’s Current Report on Form 8-K dated February 19, 2009 for a more detailed description of key modeling assumptions used in the NII sensitivity analysis). To the extent market conditions and other factors vary from the assumptions used in the simulation analysis, actual results may differ materially from the simulation results. Furthermore, NII sensitivity analysis measures the change in ASB’s twelve-month, pre-tax NII in alternate interest rate scenarios, and is intended to help management identify potential exposures in ASB’s current balance sheet and formulate appropriate strategies for managing interest rate risk. The simulation does not contemplate any actions that ASB management might undertake in response to changes in interest rates. Further, the changes in NII vary in the twelve-month simulation period and are not necessarily evenly distributed over the period. These analyses are for analytical purposes only and do not represent management’s views of future market movements, the level of future earnings, or the timing of any changes in earnings within the twelve month analysis horizon. The actual impact of changes in interest rates on NII will depend on the magnitude and speed with which rates change, actual changes in ASB’s balance sheet, and management’s responses to the changes in interest rates.

## Controls and procedures

As filed, 2,949 characters.

### HEI:

### Changes in Internal Control over Financial Reporting

During the second quarter of 2009, there was no change in internal control over financial reporting identified in connection with management’s evaluation of the effectiveness of the Company’s internal control over financial reporting as of June 30, 2009 that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting.

### Conclusion Regarding the Effectiveness of Disclosure Controls and Procedures

Constance H. Lau, HEI Chief Executive Officer, and James A. Ajello, HEI Chief Financial Officer, have evaluated the disclosure controls and procedures of HEI as of June 30, 2009. Based on their evaluations, as of June 30, 2009, they have concluded that the disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) were effective in ensuring that information required to be disclosed by HEI in reports HEI files or submits under the Securities Exchange Act of 1934:

(1) is recorded, processed, summarized, and reported within the time periods specified in the Securities and Exchange Commission rules and forms, and

(2) is accumulated and communicated to HEI management, including HEI’s principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

### HECO:

### Changes in Internal Control over Financial Reporting

During the second quarter of 2009, there was no change in internal control over financial reporting identified in connection with management’s evaluation of the effectiveness of HECO and its subsidiaries’ internal control over financial reporting as of June 30, 2009 that has materially affected, or is reasonably likely to materially affect, HECO and its subsidiaries’ internal control over financial reporting.

### Conclusion Regarding the Effectiveness of Disclosure Controls and Procedures

Richard M. Rosenblum, HECO Chief Executive Officer, and Tayne S. Y. Sekimura, HECO Chief Financial Officer, have evaluated the disclosure controls and procedures of HECO as of June 30, 2009. Based on their evaluations, as of June 30, 2009, they have concluded that the disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) were effective in ensuring that information required to be disclosed by HECO in reports HECO files or submits under the Securities Exchange Act of 1934:

(1) is recorded, processed, summarized, and reported within the time periods specified in the Securities and Exchange Commission rules and forms, and

(2) is accumulated and communicated to HECO management, including HECO’s principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

## Risk factors

As filed, 446 characters.

For information about Risk Factors, see pages 31 to 41 of HEI’s 2008 Form 10-K, and “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” “Quantitative and Qualitative Disclosures about Market Risk,” HEI’s Consolidated Financial Statements and HECO’s Consolidated Financial Statements herein. Also, see “Forward-Looking Statements” on pages v and vi of HEI’s 2008 Form 10-K, as updated on pages iv and v herein.

Filed Aug 7, 2009.
Source: SEC EDGAR, the filing index for accession 0001193125-09-167959. Last ingested by Listed: Nov 14, 2026, 17:21 ET. No prices; not investment advice.