# Boeing Co: Form 10-Q for the period ended Mar 31, 2010

- Company: [Boeing Co](/companies/ba.md) (CIK 12927)
- Form: 10-Q
- Filed: 2010-04-21
- Accepted by EDGAR: Apr 21, 2010, 12:36 ET
- Period: 2010-03-31
- Accession: 0001193125-10-088623
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/12927/000119312510088623/d10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/12927/000119312510088623/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2010-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2010-01-01 to 2010-03-31 | $15.22bn | us-gaap:Revenues |
| Cost of revenue | 3 months, 2010-01-01 to 2010-03-31 | $12.14bn | us-gaap:CostOfRevenue |
| Gross profit | 3 months, 2010-01-01 to 2010-03-31 | $3.07bn | us-gaap:GrossProfit |
| Research and development | 3 months, 2010-01-01 to 2010-03-31 | $1.00bn | us-gaap:ResearchAndDevelopmentExpense |
| Operating income | 3 months, 2010-01-01 to 2010-03-31 | $1.17bn | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2010-01-01 to 2010-03-31 | $531.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2010-01-01 to 2010-03-31 | $519.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2010-01-01 to 2010-03-31 | $0.70 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2010-01-01 to 2010-03-31 | $0.71 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2010-01-01 to 2010-03-31 | 740,100,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2010-01-01 to 2010-03-31 | −$285.0m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2010-01-01 to 2010-03-31 | $186.0m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2010-01-01 to 2010-03-31 | $318.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2010-03-31 | $4.52bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2010-03-31 | $36.80bn | us-gaap:AssetsCurrent |
| Total assets | at 2010-03-31 | $62.97bn | us-gaap:Assets |
| Current liabilities | at 2010-03-31 | $33.48bn | us-gaap:LiabilitiesCurrent |
| Current portion of debt | at 2010-03-31 | $1.48bn | us-gaap:DebtCurrent |
| Shareholders' equity | at 2010-03-31 | $2.94bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 41,863 characters.

### Consolidated Operating Results

The following table summarizes key indicators of consolidated results of operations:

*(Dollars in millions, except per share data)*

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| Revenues | **$15,216** | $16,502 |
| Earnings from operations | **$1,174** | $1,025 |
| Operating margins | **7.7%** | 6.2% |
| Effective income tax rate | **50.6%** | 34.0% |
| Net earnings from continuing operations | **$519** | $615 |
| Diluted earnings per share | **$0.70** | $0.86 |

*(Dollars in millions)*

|  | March 31 2010 | December 31 2009 |
| --- | ---: | ---: |
| Contractual backlog | **$298,855** | $296,500 |
| Unobligated backlog | **15,921** | 19,058 |

### Revenues

The following table summarizes revenues:

*(Dollars in millions)*

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| Commercial Airplanes | **$7,468** | $8,554 |
| Boeing Defense, Space & Security | **7,613** | 7,720 |
| Boeing Capital Corporation | **162** | 163 |
| Other segment | **36** | 39 |
| Unallocated items and eliminations | **(63)** | 26 |
| Total | **$15,216** | $16,502 |

Revenues for the three months ended March 31, 2010 decreased by $1,286 million or 8% compared with the same period in 2009. Commercial Airplanes revenues decreased by $1,086 million or 13%, due to lower new airplane deliveries in the first quarter of 2010 compared with the same period in the prior year, partially offset by increases in the commercial aviation services business. Boeing Defense, Space & Security (BDS) revenues decreased by $107 million due to decreased volume in Network & Space Systems (N&SS), partially offset by increases in Boeing Military Aircraft (BMA) and Global Services & Support (GS&S). Unallocated items and eliminations decreased by $89 million when compared with the same period of the prior year, primarily due to higher revenue resulting from the delivery of an International KC-767 Tanker to the customer in the first quarter of 2009.

### Earnings From Operations

The following table summarizes earnings from operations:

*(Dollars in millions)*

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| Commercial Airplanes | **$679** | $417 |
| Boeing Defense, Space & Security | **664** | 709 |
| Boeing Capital Corporation | **46** | 37 |
| Other segment | **(50)** | (23) |
| Unallocated items and eliminations | **(165)** | (115) |
| Total | **$1,174** | $1,025 |

Operating earnings for the three months ended March 31, 2010 increased by $149 million compared with the same period in 2009. Commercial Airplanes earnings increased by $262 million due to the absence of a $347 million reach forward loss on the 747 program recorded in the first quarter of 2009, partially offset by lower new airplane deliveries in the first quarter of 2010. BDS earnings decreased by $45 million primarily due to lower earnings in the N&SS and BMA segments. Unallocated items and eliminations reduced 2010 earnings by $50 million primarily due to higher deferred compensation expense.

The most significant expense items not allocated to segments are shown in the table below:

*(Dollars in millions)*

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| Share-based plans expense | **$(47)** | $(57) |
| Deferred compensation (expense)/income | **(81)** | 23 |
| Other unallocated items and eliminations | **(47)** | (81) |
| Pension | **21** | 23 |
| Postretirement | **(11)** | (23) |
| Total | **$(165)** | $(115) |

Deferred compensation expense for the three months ended March 31, 2010 increased by $104 million compared with the same period of the prior year. The year over year changes in deferred compensation expense are primarily driven by changes in our stock price and broad stock market conditions.

Unallocated pension and other postretirement expense represents the difference between costs recognized under Generally Accepted Accounting Principles in the United States of America in the consolidated financial statements and federal cost accounting standards required to be utilized by our business segments for U.S. government contracting purposes. We recorded net periodic benefit cost related to pensions and other postretirement benefits of $469 million and $454 million for the three months ended March 31, 2010 and 2009. Not all net periodic benefit cost is recognized in earnings in the period incurred. A portion of net periodic benefit cost is allocated to production as product cost and a portion remains in inventory at the end of the reporting period.

Earnings from operations included the following net periodic benefit cost allocated to business segments and Other unallocated items and eliminations:

| Three months ended March 31, | Pension 2010 | 2009 | Other Postretirement Benefits 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Allocated to business segments | **$(305)** | $(242) | **$(112)** | $(134) |
| Other unallocated items and eliminations | **21** | 23 | **(11)** | (23) |
| Total | **$(284)** | $(219) | **$(123)** | $(157) |

### Other Earnings Items

*(Dollars in millions)*

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| **Earnings from operations** | **$1,174** | $1,025 |
| Other expense, net | **(2)** | (36) |
| Interest and debt expense | **(122)** | (57) |
| **Earnings before income taxes** | **1,050** | 932 |
| Income tax expense | **(531)** | (317) |
| **Net earnings from continuing operations** | **$519** | $615 |

Interest and debt expense for the three months ended March 31, 2010 increased by $65 million compared with the same period of the prior year due to debt issued in 2009.

The effective tax rates were 50.6% and 34.0% for the three months ended March 31, 2010 and 2009. The increase in the effective tax rate as compared with the prior year was primarily due to an income tax charge of $150 million recorded during the first quarter of 2010 as a result of the Patient Protection and Affordable Care Act, as modified by the Health Care and Education Reconciliation Act of 2010. As a result of this legislation, beginning in 2013, we will no longer be able to claim an income tax deduction related to prescription drug benefits provided to retirees and reimbursed under the Medicare Part D retiree drug subsidy. The increase in the effective tax rate was also due to U.S. research tax credit benefits that existed in 2009, but do not exist in 2010. The research tax credit reduced the 2009 tax rate by 3.2% in the first quarter of 2009.

For additional discussion related to Income Taxes, see Note 3.

### Backlog

Contractual backlog of unfilled orders excludes purchase options, announced orders for which definitive contracts have not been executed and unobligated U.S. and non-U.S. government contract funding. The increase in contractual backlog during the three months ended March 31, 2010 compared with December 31, 2009 was primarily due to increases at BDS resulting from an award for an AEW&C Australia support contract and funding of existing multi-year contracts including the Chinook, Proprietary , and V-22 programs.

Unobligated backlog includes U.S. and foreign government definitive contracts for which funding has not been authorized. The decrease in unobligated backlog during the three months ended March 31, 2010 is primarily due to funding of existing multi-year contracts including the Chinook, Proprietary, and V-22 programs.

### Segment Results of Operations

### Commercial Airplanes

### Operating Results

*(Dollars in millions)*

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| Revenues | **$7,468** | $8,554 |
| Earnings from operations | **$679** | $417 |
| Operating margins | **9.1%** | 4.9% |

*(Dollars in millions)*

|  | March 31 2010 | December 31 2009 |
| --- | ---: | ---: |
| Contractual backlog | **$250,351** | $250,476 |

### Revenues

Year over year changes in Revenue are shown in the following table:

*(Dollars in millions)*

|  | March 31, 2010 vs. March 31, 2009 |
| --- | ---: |
| New airplane sales | $(1,192) |
| Commercial aviation services business | 134 |
| Other | (28) |
| Total | $(1,086) |

Revenues for the three months ended March 31, 2010 decreased by $1,086 million or 13% compared with the same period of 2009. This decrease in new airplane revenues in 2010 primarily reflects lower planned deliveries on the 747 program due to the transition from the 747-400 to the 747-8 derivative and supplier production challenges related to seats. The increase in revenues from commercial aviation services business was driven by increased sales of spares.

Commercial jet aircraft deliveries, including intercompany deliveries, were as follows:

|  |  |  |  |  |  |
| --- | ---: | ---: | ---: | ---: | ---: |
| **Program** | **737** | **747** | **767** | **777** | **Total** |
| Deliveries during the first quarter of 2010 | 86 |  | 3 | 19 | 108 |
| Deliveries during the first quarter of 2009 | 91 | 4 | 3 | 23 | 121 |
| Cumulative deliveries as of 3/31/2010 | 3,214 | 1,418 | 985 | 855 |  |
| Cumulative deliveries as of 12/31/2009 | 3,128 | 1,418 | 982 | 836 |  |

### Earnings From Operations

Earnings from operations for the three months ended March 31, 2010 increased by $262 million and operating margins increased by 4.2 percentage points to 9.1% compared with the same period of 2009. This increase was primarily due to the absence of the reach forward loss on the 747 program recorded in 2009, partially offset by lower new airplane deliveries in 2010. The increase to the 747 reach-forward loss in the first quarter of 2009 reduced earnings by $347 million and lowered operating margins by 4.0 percentage points. Lower airplane deliveries reduced 2010 earnings by $137 million which was partially offset by lower period costs.

### Backlog

Total contractual backlog as of March 31, 2010 was virtually unchanged compared with December 31, 2009. A number of our customers may have contractual remedies that may be implicated by program delays. We continue to address customer claims and requests for other contractual relief as they arise. However, once orders are included in firm backlog, orders remain in backlog until canceled or fulfilled, although the value of orders is adjusted as changes to price and schedule are agreed to with customers.

### Accounting Quantity

The accounting quantities, undelivered units under firm orders and percentage of anticipated orders included in the program accounting estimates as compared with the number of cumulative firm orders were as follows:

|  | Program |  |  |  |  |
| --- | ---: | ---: | ---: | ---: | ---: |
| **As of 3/31/2010** | **737** | **747** | **767** | **777** | **787** |
| Program accounting quantities | **4,600** | **1,499** | **1,035** | **1,100** | **\*** |
| Undelivered units under firm orders | **2,061** | **108** | **56** | **259** | **866** |
| Cumulative firm orders1 | **5,275** | **1,526** | **1,041** | **1,114** |  |
|  | Program |  |  |  |  |
| As of 12/31/2009 | 737 | 747 | 767 | 777 | 787 |
| Program accounting quantities | 4,600 | 1,499 | 1,035 | 1,100 | \* |
| Undelivered units under firm orders | 2,076 | 108 | 59 | 281 | 851 |
| Cumulative firm orders1 | 5,204 | 1,526 | 1,041 | 1,117 |  |

\* The accounting quantity for the 787 program will be determined in the quarter of first airplane delivery, targeted for fourth quarter of 2010.

1 Cumulative firm orders represent the cumulative number of commercial jet aircraft deliveries plus undelivered firm orders.

**737 Program** There was no change in the accounting quantity for the 737 program during the three months ended March 31, 2010.

**747 Program** During 2009 and 2008, we recorded charges of $1,352 million and $685 million to recognize reach-forward losses on the 747 program. There was no change in the accounting quantity for the 747 program during the three months ended March 31, 2010. On March 19, 2010, we announced that we will accelerate, from mid-2013 to mid-2012, a planned production rate increase to 2 from 1.5 airplanes per month. First flight of the 747-8 Freighter occurred on February 8, 2010. Three aircraft are currently engaged in flight testing and the schedule and other risks inherent in the demanding flight testing and certification phases of program development remain. Certification and first delivery of the 747-8 Freighter is expected in the fourth quarter of 2010. Certification and first delivery of the Intercontinental passenger derivative is expected in the fourth quarter of 2011. The gap between the delivery of the last 747-400, which occurred in 2009, and first deliveries of the 747-8 will result in lower 747 program revenues in 2010.

**767 Program** There was no change in the accounting quantity for the 767 program during the three months ended March 31, 2010.

**777 Program** There was no change in the accounting quantity for the 777 program during the three months ended March 31, 2010. In April 2009, we announced that monthly production of the 777 will decline from 7 to 5 airplanes per month beginning in June 2010. The lower production rate from June 2010 through mid-2011 will decrease revenues and earnings in 2010 and 2011. On March 19, 2010, we announced that we will accelerate by approximately six months, from early 2012 to mid-2011, a planned production rate increase.

**787 Program** Flight testing for the 787 program, which will involve six aircraft, continued during the first quarter of 2010. Four aircraft are currently engaged in flight testing. We anticipate that all six flight test aircraft will be in the air by mid-year 2010 with expected certification and first delivery of the 787-8 in the fourth quarter of 2010. We continue to work toward our planned increases in 787 production rates as well as the timely introduction of the 787-9 derivative. Such efforts include the construction of a second assembly line in North Charleston, South Carolina and the establishment of transitional surge capacity at our Everett, Washington location to facilitate the planned introduction of the 787-9.

During 2009, we concluded that the first three flight-test 787 aircraft could not be sold as previously anticipated due to the inordinate amount of rework and unique and extensive modifications made to those aircraft. We believe that the other three additional 787 flight test aircraft are commercially saleable and we continue to include costs related to those aircraft in program inventory at March 31, 2010. If we determine that one or more of the other flight test aircraft cannot be sold, we may incur additional charges.

We continue to monitor and address other areas of challenge associated with assembly of initial airplanes including management of our extended global supply chain, completion and integration of traveled work as well as weight and systems integration. Efforts continue to ensure we remain focused on satisfying customer mission and performance needs in light of the anticipated weight of their respective aircraft.

We continue to work with our customers and suppliers to assess the specific impacts of schedule changes, including delivery delays and supplier assertions. A number of our customers have contractual remedies for schedule delays and/or performance. We continue to address customer and supplier claims and requests for other contractual relief as brought forth.

The cumulative impacts of the production challenges, schedule delays and customer and supplier impacts create significant pressure on program revenue and cost estimates. We continue to assess our mitigation plans and cost reduction efforts to address these pressures.

### Additional Considerations

The 787 and 747-8 programs highlight the risks that are always inherent in new airplane programs and new derivative airplanes, particularly as both the 747-8 and the 787 continue the demanding flight test and certification phases of program development. Costs related to development of new programs and derivative airplanes are expensed as incurred. Costs to produce new aircraft are included in inventory and accounted for using program accounting. Airplane programs have risk for reach-forward losses if our estimated production costs exceed our estimated program revenues for the accounting quantity. Generally commercial airplanes are sold on a firm fixed-price basis with an indexed price escalation clause and are often sold several years before scheduled delivery. Each customer purchase agreement contains an escalation clause to account for the effects of economic fluctuations over the period of time from airplane sale to airplane delivery. A price escalation formula based on pre-defined factors is used to determine the final price of the airplane at the time of customer delivery. While firm fixed-price contracts allow us to benefit from cost savings, they also expose us to the risk of cost overruns. Many new airplanes and derivatives have highly complex designs, utilize exotic materials and require extensive coordination and integration with supplier partners. As technical or quality issues arise, such as issues experienced on the 787 and 747-8 programs, we may experience schedule delays and higher costs to complete new programs and derivative aircraft. Additionally, price escalation factors may also impact margins by reducing the estimated price of airplanes delivered in the future. There are other factors that could also result in lower margins or a material charge if a program has or is determined to have reach-forward losses. These include: changes to the program accounting quantity, production costs and rates, capital expenditures and other costs associated with increasing or adding new production capacity, learning curve, anticipated cost reductions, flight test and certification schedules, costs, schedule and demand for derivative airplanes and status of customer claims, supplier assertions and other contractual negotiations. While we believe the cost and revenue estimates incorporated in the financial statements are appropriate, the technical complexity of these programs creates financial risk as additional completion costs may become necessary or scheduled delivery dates could be extended, which could trigger termination provisions, order cancellations or other financially significant exposure.

### Boeing Defense, Space & Security

### Business Environment and Trends

On January 7, 2010, we announced that Integrated Defense Systems will begin operating under the name Boeing Defense, Space & Security (BDS). BDS consists of three capabilities-driven businesses: Boeing Military Aircraft (BMA), Network & Space Systems (N&SS) and Global Services & Support (GS&S). Additionally, BDS Phantom Works supports all three businesses via product development, rapid prototyping and customer engagement through experimentation and enterprise technology investment strategies.

### BDS Realignment

Effective January 1, 2010, certain programs were realigned between BDS segments. Business segment data for all periods presented have been adjusted to reflect the realignment. See Note 13.

### Operating Results

*(Dollars in millions)*

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| Revenues | **$7,613** | $7,720 |
| Earnings from operations | **$664** | $709 |
| Operating margins | **8.7%** | 9.2% |

*(Dollars in millions)*

|  | March 31 2010 | December 31 2009 |
| --- | ---: | ---: |
| Contractual backlog | **$48,505** | $46,024 |
| Unobligated backlog | **15,708** | 18,815 |

### Revenues

BDS revenues for the three months ended March 31, 2010 decreased by $107 million or 1% when compared with the same period in 2009. The decrease was due to lower volume in N&SS, partially offset by an increase in BMA and GS&S.

### Earnings From Operations

BDS operating earnings for the three months ended March 31, 2010 decreased $45 million and operating margins decreased 0.5% to 8.7% when compared with the same period in 2009. The decreases were primarily due to lower volume in the N&SS segment and lower margins in the BMA segment.

### Backlog

Total backlog is comprised of contractual backlog, which represents work we are on contract to perform for which we have received funding, and unobligated backlog, which represents work we are on contract to perform for which funding has not yet been authorized and appropriated. BDS total backlog decreased 1% in 2010, from $64,839 million to $64,213 million, due to current year deliveries and sales on multi-year contracts awarded in prior years, partially offset by net increases in several GS&S programs.

For further details on the changes between periods, refer to the discussions of the individual segments below.

### Additional Considerations

Our business includes a variety of development programs which have complex design and technical challenges. Many of these programs have cost-type contracting arrangements. In these cases the associated financial risks are primarily in lower profit rates or program cancellation if milestones and technical progress are not accomplished. Examples of these programs include Airborne Laser, EA-18G, Family of Beyond Line-of-Sight Terminals, Brigade Combat Team Modernization (BCTM), Ground-based Midcourse Defense (GMD), Joint Tactical Radio System, P-8A and Proprietary programs.

Some of our development programs are contracted on a fixed-price basis. Many of these programs have highly complex designs. As technical or quality issues arise, we may experience schedule delays and cost impacts, which could increase our estimated cost to perform the work or reduce our estimated price, either of which could result in a material charge. These programs are ongoing, and while we believe the cost and fee estimates incorporated in the financial statements are appropriate, the technical complexity of these programs creates financial risk as additional completion costs may become necessary or scheduled delivery dates could be extended, which could trigger termination provisions, the loss of satellite in-orbit incentive payments, or other financially significant exposure. These programs have risk for reach-forward losses if our estimated costs exceed our estimated contract revenues. Examples of these programs include Airborne Early Warning and Control (AEW&C), International KC-767 Tanker, commercial and military satellites.

### Boeing Military Aircraft

### Operating Results

*(Dollars in millions)*

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| Revenues | **$3,241** | $3,067 |
| Earnings from operations | **$267** | $288 |
| Operating margins | **8.2%** | 9.4% |

*(Dollars in millions)*

|  | March 31 2010 | December 31 2009 |
| --- | ---: | ---: |
| Contractual backlog | **$27,499** | $26,354 |
| Unobligated backlog | **7,197** | 9,297 |

34

### Revenues

BMA revenues for the three months ended March 31, 2010 increased by $174 million or 6% when compared with the same period in 2009. The increase is due to higher deliveries and volume on the F-18 and Chinook programs, partially offset by the International KC-767 Tanker and T-45 programs which had no deliveries in 2010.

Deliveries of units for new-build production aircraft, excluding remanufactures and modifications, were as follows:

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| F/A-18 Models | **13** | 10 |
| F-15E Eagle | **3** | 4 |
| C-17 Globemaster | **3** | 3 |
| AH-64 Apache | **4** | 5 |
| CH-47 Chinook | **2** |  |
| International KC-767 Tanker |  | 1 |
| T-45TS Goshawk |  | 2 |
| Total new-build production aircraft | **25** | 25 |

### Earnings From Operations

BMA operating earnings for the three months ended March 31, 2010 decreased by $21 million or 7% when compared with the same period in 2009, primarily due to lower earnings on C-17 and higher research and development expenditures, partially offset by changes in delivery mix.

### Backlog

BMA total backlog was $34,696 million at March 31, 2010, a decrease of 3% from December 31, 2009, primarily due to revenues recognized on the F-18 and C-17 programs.

### Additional Considerations

Items which could have a future impact on BMA operations include the following:

**AEW&C** During 2009 and 2008, we recorded charges increasing the reach-forward losses on the AEW&C programs in Australia and Turkey by $133 million and $308 million. The 2009 charge primarily related to delivery schedule delays. The 2008 charge, primarily related to our program in Australia, was due to subsystem development issues on the electronic warfare and ground support systems and the additional time required for integration testing. The AEW&C development program, also known as Wedgetail in Australia, Peace Eagle in Turkey and Peace Eye in the Republic of Korea, consists of 737-700 aircraft outfitted with a variety of command and control and advanced radar systems, some of which have never been installed on an airplane before. Wedgetail includes six aircraft and Peace Eagle and Peace Eye include four aircraft each. During the fourth quarter of 2009, two Wedgetail aircraft were provided to Australia for familiarization and training. Wedgetail final delivery and customer acceptance is scheduled to begin in late 2010 and extend through the second quarter of 2011. These are advanced and complex fixed-price development programs involving technical challenges at the individual subsystem level and in the overall integration of these subsystems into a reliable and effective operational capability. We believe that the cost and revenue estimates incorporated in the financial statements are appropriate; however, the technical complexity of the programs creates financial risk as additional completion costs may be necessary or scheduled delivery dates could be delayed.

**International KC-767 Tanker Program** During 2009 and 2008, we recorded charges increasing the reach-forward losses on the International KC-767 Tanker programs by $78 million and $85 million. The International KC-767 Tanker program includes four aircraft for the Italian Air Force and four aircraft for the Japanese Air Self Defense Force. The final delivery to Japan was made in December 2009. The Italian International KC-767 program is ongoing, and while we believe the revenue and cost estimates incorporated in the financial statements are appropriate, the technical complexity of the program creates financial risk as additional completion and development costs may be necessary or remaining scheduled delivery dates could be delayed.

**C-17** See the discussion of possible decision to complete C-17 production in Note 6 Liabilities, Commitments and Contingencies.

### Network & Space Systems

### Operating Results

*(Dollars in millions)*

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| Revenues | **$2,323** | $2,678 |
| Earnings from operations | **$174** | $207 |
| Operating margins | **7.5%** | 7.7% |

*(Dollars in millions)*

|  | March 31 2010 | December 31 2009 |
| --- | ---: | ---: |
| Contractual backlog | **$8,457** | $7,746 |
| Unobligated backlog | **8,074** | 9,187 |

### Revenues

N&SS revenues for the three months ended March 31, 2010 decreased by $355 million or 13% when compared with the same period in 2009. The decrease is due to lower volume on the BCTM and GMD programs, partially offset by increased volume on several satellite programs.

### Earnings From Operations

N&SS operating earnings for the three months ended March 31, 2010 decreased by $33 million or 16% when compared with the same period in 2009. The decrease in earnings is due to lower volume on the BCTM and GMD programs, partially offset by higher earnings from our investment in United Launch Alliance (ULA).

### Backlog

N&SS total backlog was $16,531 million at March 31, 2010, a decrease of 2% from December 31, 2009 primarily due to revenues recognized on multi-year contracts awarded in prior years including BCTM, satellite, Proprietary and International Space Station programs, partially offset by an award on the GMD program.

### Additional Considerations

Items which could have a future impact on N&SS operations include the following:

**United Launch Alliance** On December 1, 2006, we and Lockheed Martin Corporation (Lockheed) created a 50/50 joint venture named United Launch Alliance L.L.C. ULA combines the production, engineering, test and launch operations associated with U.S. government launches of Boeing Delta and Lockheed Atlas rockets. We initially contributed net assets of $914 million at December 1, 2006. The book value of our investment exceeded our proportionate share of ULA’s net assets. This difference is expensed ratably in future years. Based on the adjusted contributions and the conformed accounting policies established by ULA, this amortization is expected to be approximately $15 million annually for the next 14 years.

In connection with the formation of ULA, we and Lockheed each have agreed to extend a line of credit to ULA of up to $200 million to support its working capital requirements during the 5 year period following December 1, 2006. We and Lockheed transferred performance responsibility for certain U.S. government contracts to ULA as of the closing date. We and Lockheed agreed to jointly guarantee the performance of those contracts to the extent required by the U.S. government. We and Lockheed have also each committed to provide ULA with up to $147 million of additional capital contributions in the event ULA does not have sufficient funds to make a required payment to us under an inventory supply agreement. See Note 4.

We agreed to indemnify ULA through December 31, 2020 against potential non-recoverability and non-allowability of $1,360 million of Boeing Delta inventories included in contributed assets plus $1,860 million of inventory subject to an inventory supply agreement which ends on March 31, 2021. Since inception, ULA has consumed $1,165 million of inventories that were contributed by us and has made payments of $180 million to us under the inventory supply agreement. As part of its integration, ULA is continuing to assess the future of the Delta II program beyond what is currently on contract. In the event ULA is unable to sell additional Delta II inventory, earnings could be reduced by up to $70 million.

We agreed to indemnify ULA against potential losses that ULA may incur in the event ULA is unable to obtain certain additional contract pricing from the U.S. Air Force (USAF) for four satellite missions. We believe ULA is entitled to additional contract pricing. In December 2008, ULA submitted a claim to the USAF to re-price the contract value for two of the four satellite missions covered by the indemnification. In March 2009, the USAF issued a denial of that claim and in June 2009, ULA filed an appeal. During 2009, the USAF exercised its option for a third satellite mission. ULA intends to submit a claim to the USAF in 2010 to re-price the contract value of the third mission. If ULA is unsuccessful obtaining additional pricing we may be responsible for some of the shortfall and may record up to $382 million in pre-tax losses associated with the four missions.

**Sea Launch** See the discussion of Sea Launch Chapter 11 Filing in Note 6 Liabilities, Commitments and Contingencies.

**Satellites** See the discussions of Boeing Satellite Systems International, Inc. (BSSI) in Note 12 Legal Proceedings and discussion of Satellite insurance risk in Note 6 Liabilities, Commitments and Contingencies.

### Global Services & Support

### Operating Results

*(Dollars in millions)*

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| Revenues | **$2,049** | $1,975 |
| Earnings from operations | **$223** | $214 |
| Operating margins | **10.9%** | 10.8% |

*(Dollars in millions)*

|  | March 31 2010 | December 31 2009 |
| --- | ---: | ---: |
| Contractual backlog | **$12,549** | $11,924 |
| Unobligated backlog | **437** | 331 |

### Revenues

GS&S revenues for the three months ended March 31, 2010 increased by $74 million or 4% when compared with the same period in 2009. The increase was primarily due to increased volume in the Integrated Logistics (IL) division and a Maintenance, Modification and Upgrades (MM&U) program.

### Earnings From Operations

GS&S operating earnings for the three months ended March 31, 2010 increased $9 million when compared with the same period in 2009 with a slight increase in overall margins.

### Backlog

GS&S total backlog was $12,986 million at March 31, 2010, an increase of 6% from December 31, 2009, primarily due to an award for an AEW&C Australia support contract.

### Boeing Capital Corporation

### Operating Results

*(Dollars in millions)*

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| Revenues | **$162** | $163 |
| Earnings from operations | **$46** | $37 |
| Operating margins | **28%** | 23% |

### Revenues

BCC segment revenues consist principally of lease income from equipment under operating lease and interest from financing receivables and notes. BCC’s revenues for the three months ended March 31, 2010, decreased $1 million when compared with the same period in 2009 primarily due to lower operating lease income resulting from a smaller portfolio of equipment under operating leases, partially offset by gain on disposal of assets.

### Earnings From Operations

BCC’s operating earnings are presented net of interest expense, provision for losses, asset impairment expense, depreciation on leased equipment and other operating expenses. Operating earnings for the three months ended March 31, 2010 increased by $9 million primarily due to lower interest expense and a lower provision for losses partially offset by lower revenues.

### Financial Position

The following table presents selected financial data for BCC:

*(Dollars in millions)*

|  | March 31 2010 | December 31 2009 |
| --- | ---: | ---: |
| BCC customer financing and investment portfolio | **$5,383** | $5,666 |
| Valuation allowance as a % of total receivables | **2.7%** | 2.5% |
| Debt | **$4,042** | $4,075 |
| Debt-to-equity ratio | **5.6-to-1** | 5.8-to-1 |

BCC’s customer financing and investment portfolio at March 31, 2010 decreased from December 31, 2009 due to normal portfolio run-off. At March 31, 2010 and December 31, 2009, BCC had $309 million and $385 million of assets that were held for sale or re-lease, of which $244 million and $345 million had either executed term sheets with deposits or firm contracts to be sold or placed on lease. Additionally, aircraft subject to leases with a carrying value of approximately $59 million are scheduled to be returned off lease in the next 12 months. These aircraft are being remarketed or the leases are being extended.

### Restructurings and Restructuring Requests

From time to time, certain customers have requested a restructuring of their transactions with BCC. As of March 31, 2010, BCC has not reached agreement on any restructuring requests that would have a material adverse effect on its earnings, cash flows and/or financial position.

### Other Segment

*(Dollars in millions)*

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| Revenues | **$36** | $39 |
| Loss from operations | **(50)** | (23) |

Revenues for the three months ended March 31, 2010 decreased by $3 million compared with the same period of 2009. Other segment losses for three months ended March 31, 2010 increased by $27 million primarily due to higher expenses recognized in the Other segment relating to environmental remediation than compared to the same period of 2009.

### Liquidity and Capital Resources

### Cash Flow Summary

*(Dollars in millions)*

|  | Three months ended March 31 2010 | 2009 |
| --- | ---: | ---: |
| Net earnings | **$519** | $610 |
| Non-cash items | **529** | 545 |
| Changes in working capital | **(1,333)** | (962) |
| Net cash (used)/provided by operating activities | **(285)** | 193 |
| Net cash used by investing activities | **(4,041)** | (598) |
| Net cash (used)/provided by financing activities | **(347)** | 1,391 |
| Effect of exchange rate changes on cash and cash equivalents | **(25)** | (17) |
| Net (decrease)/increase in cash and cash equivalents | **(4,698)** | 969 |
| Cash and cash equivalents at beginning of year | **9,215** | 3,268 |
| Cash and cash equivalents at end of period | **$4,517** | $4,237 |

**Operating Activities** Net cash used by operating activities of $285 million during the three months ended March 31, 2010 changed by $478 million compared to the same period in 2009 primarily due to higher net working capital in 2010. The net working capital increase was driven by growth in inventory as we continue to build inventories prior to the anticipated delivery of the 787 and 747-8 airplanes.

**Investing Activities** Cash used by investing activities totaled $4,041 million during the three months ended March 31, 2010 compared with $598 million used during the same period in 2009, largely due to contributions to investments during the three months ended March 31, 2010, which consisted primarily of time deposits. This was partially offset by $256 million of lower capital spending on property, plant and equipment additions. We expect capital spending in 2010 to be higher than 2009 due to the construction of a second 787 final assembly line in North Charleston, South Carolina.

**Financing Activities** Cash used by financing activities totaled $347 million during the three months ended March 31, 2010 compared with $1,391 million provided during the three months ended March 31, 2009, primarily due to proceeds from borrowings of $1,827 million in 2009.

During the three months ended March 31, 2010, we repaid $51 million of debt, including scheduled repayments of $35 million of debt held at BCC. The recorded balance of debt as of March 31, 2010 was $12,943 million, of which $1,479 million was classified as short-term. This includes $4,042 million of debt recorded at BCC, of which $1,420 million was classified as short-term.

During the three months ended March 31, 2010, we did not repurchase any shares through our open market share repurchase program and had 260,387 shares transferred to us from employees for tax withholding. During the three months ended March 31, 2009, we repurchased 1,173,152 shares at an average price of $42.94 in our open market share repurchase program and 339,132 shares were transferred to us from employees for tax withholding. Cash used for treasury share repurchases was $50 million for the three months ended March 31, 2009.

**Credit Ratings** Our credit ratings are summarized below:

|  | Fitch | Moody’s | Standard & Poor’s |
| --- | --- | --- | --- |
| Long-term: |  |  |  |
| Boeing/BCC | A+ | A2 | A |
| Outlook | Negative | Negative | Stable |
| Short-term: |  |  |  |
| Boeing/BCC | F1 | P-1 | A-1 |

**Capital Resources** We have substantial borrowing capacity. Any future borrowings may affect our credit ratings and are subject to various debt covenants. We and BCC have commercial paper programs that continue to serve as significant potential sources of short-term liquidity. As of March 31, 2010, neither we nor BCC had any commercial paper borrowings outstanding. Currently, we have $3,525 million ($1,500 million exclusively available for BCC) of unused borrowing on revolving credit line agreements. We anticipate that these credit lines will primarily serve as backup liquidity to support possible commercial paper borrowings in 2010.

In the event we require additional funding to support strategic business opportunities, our commercial aircraft financing commitments, unfavorable resolution of loss contingencies, or other business requirements, we expect to meet increased funding requirements by issuing commercial paper or term debt. We believe our ability to access external capital resources should be sufficient to satisfy existing short-term and long-term commitments and plans, and also to provide adequate financial flexibility to take advantage of potential strategic business opportunities should they arise within the next year. However, there can be no assurance of the cost or availability of future borrowings, if any, under our commercial paper program, in the debt markets or our credit facilities.

As of March 31, 2010, we continue to be in full compliance with all covenants contained in our debt agreements. The most restrictive covenants include a limitation on mortgage debt and sale and leaseback transactions as a percentage of consolidated net tangible assets (as defined in the credit agreements), and a limitation on consolidated debt as a percentage of total capital (as defined). When considering such debt covenants, we continue to have substantial borrowing capacity.

### Off-Balance Sheet Arrangements

We are a party to certain off-balance sheet arrangements including certain guarantees. For discussion of these arrangements, see Note 7.

### Contingent Obligations

We have significant contingent obligations that arise in the ordinary course of business, which include the following:

**Legal** Various legal proceedings, claims and investigations are pending against us. Legal contingencies are discussed in Note 12, including our contesting the default termination of the A-12 aircraft, employment and benefits litigation brought by several of our current or former employees, litigation/arbitration involving BSSI and civil securities litigation.

**Environmental Remediation** We are involved with various environmental remediation activities and have recorded a liability of $716 million at March 31, 2010. For additional information, see Note 6.

**Income Taxes** We have recorded a net liability of $1,713 million at March 31, 2010 for uncertain tax positions. For further discussion of income taxes, see Note 3.

## Controls and procedures

As filed, 1,014 characters.

(a) Disclosure Controls and Procedures.

Our Chief Executive Officer and Chief Financial Officer have evaluated our disclosure controls and procedures as of March 31, 2010 and have concluded that these disclosure controls and procedures are effective to ensure that information required to be disclosed by us in the reports that we file or submit under the Securities Exchange Act of 1934, as amended, is recorded, processed, summarized and reported within the time periods specified in the Commission’s rules and forms and is accumulated and communicated to our management, including the Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

(b) Changes in Internal Control Over Financial Reporting.

There were no changes in our internal control over financial reporting that occurred during the first quarter of 2010 that have materially affected or are reasonably likely to materially affect our internal control over financial reporting.

## Risk factors

As filed, 181 characters.

There have been no material changes in our risk factors from those disclosed in Part I, Item 1A. Risk Factors in our Annual Report on Form 10-K for the year ended December 31, 2009.

Filed Apr 21, 2010.