# Boeing Co: Form 10-Q for the period ended Sep 30, 2010

- Company: [Boeing Co](/companies/ba.md) (CIK 12927)
- Form: 10-Q
- Filed: 2010-10-20
- Accepted by EDGAR: Oct 20, 2010, 12:46 ET
- Period: 2010-09-30
- Accession: 0001193125-10-232425
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/12927/000119312510232425/d10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/12927/000119312510232425/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2010-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2010-07-01 to 2010-09-30 | $16.97bn | us-gaap:Revenues |
| Revenue | 9 months, 2010-01-01 to 2010-09-30 | $47.76bn | us-gaap:Revenues |
| Cost of revenue | 3 months, 2010-07-01 to 2010-09-30 | $13.75bn | us-gaap:CostOfRevenue |
| Cost of revenue | 9 months, 2010-01-01 to 2010-09-30 | $38.43bn | us-gaap:CostOfRevenue |
| Gross profit | 3 months, 2010-07-01 to 2010-09-30 | $3.22bn | us-gaap:GrossProfit |
| Gross profit | 9 months, 2010-01-01 to 2010-09-30 | $9.33bn | us-gaap:GrossProfit |
| Research and development | 3 months, 2010-07-01 to 2010-09-30 | $986.0m | us-gaap:ResearchAndDevelopmentExpense |
| Research and development | 9 months, 2010-01-01 to 2010-09-30 | $2.99bn | us-gaap:ResearchAndDevelopmentExpense |
| Operating income | 3 months, 2010-07-01 to 2010-09-30 | $1.39bn | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2010-01-01 to 2010-09-30 | $3.87bn | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2010-07-01 to 2010-09-30 | $407.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2010-01-01 to 2010-09-30 | $1.36bn | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2010-07-01 to 2010-09-30 | $837.0m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2010-01-01 to 2010-09-30 | $2.14bn | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2010-07-01 to 2010-09-30 | $1.12 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2010-01-01 to 2010-09-30 | $2.89 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2010-07-01 to 2010-09-30 | $1.13 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2010-01-01 to 2010-09-30 | $2.91 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2010-07-01 to 2010-09-30 | 744,600,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2010-01-01 to 2010-09-30 | 743,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2010-01-01 to 2010-09-30 | $1.84bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 9 months, 2010-01-01 to 2010-09-30 | $725.0m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 9 months, 2010-01-01 to 2010-09-30 | $945.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2010-09-30 | $2.86bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2010-09-30 | $39.45bn | us-gaap:AssetsCurrent |
| Total assets | at 2010-09-30 | $65.22bn | us-gaap:Assets |
| Current liabilities | at 2010-09-30 | $34.24bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2010-09-30 | $60.67bn | us-gaap:Liabilities |
| Current portion of debt | at 2010-09-30 | $953.0m | us-gaap:DebtCurrent |
| Shareholders' equity | at 2010-09-30 | $4.45bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 52,914 characters.

### Consolidated Operating Results

The following table summarizes key indicators of consolidated results of operations:

*(Dollars in millions, except per share data)*

|  | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$47,756** | $50,344 | **$16,967** | $16,688 |
| Earnings/(loss) from operations | **$3,868** | $403 | **$1,387** | $(2,151) |
| Operating margins | **8.1%** | 0.8% | **8.2%** | -12.9% |
| Effective income tax rate | **38.8%** | 71.3% | **32.7%** | 30.6% |
| Net earnings/(loss) from continuing operations | **$2,145** | $52 | **$837** | $(1,560) |
| Diluted earnings/(loss) per share | **$2.89** | $0.06 | **$1.12** | $(2.23) |

*(Dollars in millions)*

|  | September 30 2010 | December 31 2009 |
| --- | ---: | ---: |
| Contractual backlog | **$301,471** | $296,500 |
| Unobligated backlog | **19,425** | 19,058 |

### Revenues

The following table summarizes revenues:

*(Dollars in millions)*

|  | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Commercial Airplanes | **$23,650** | $24,868 | **$8,749** | $7,883 |
| Boeing Defense, Space & Security | **23,778** | 25,114 | **8,182** | 8,744 |
| Boeing Capital Corporation | **494** | 496 | **170** | 166 |
| Other segment | **107** | 125 | **27** | 51 |
| Unallocated items and eliminations | **(273)** | (259) | **(161)** | (156) |
| Total | **$47,756** | $50,344 | **$16,967** | $16,688 |

Revenues for the nine months ended September 30, 2010 decreased by $2,588 million or 5% when compared with the same period in 2009. Commercial Airplanes revenues for the nine months decreased by $1,218 million. The decrease reflects lower deliveries on the 747 program due to the planned transition from the 747-400 to the 747-8 derivative and lower 777 deliveries primarily resulting from a production rate change to 5 per month beginning in June 2010. These were partially offset by increases in commercial aviation services business. Boeing Defense, Space & Security (BDS) revenues for the nine months decreased by $1,336 million primarily due to lower revenues in the Network & Space Systems (N&SS) segment.

Revenues for the three months ended September 30, 2010 increased by $279 million or 2% when compared with the same period in 2009. Commercial Airplanes revenues for the three months increased by $866 million primarily due to higher new airplane deliveries resulting from improvements on 737 and 777 supplier production challenges related to seats and an increase in commercial aviation services business. BDS revenues for the three months decreased by $562 million, primarily due to lower revenues in the N&SS and Boeing Military Aircraft (BMA) segments.

### Earnings From Operations

The following table summarizes earnings from operations:

*(Dollars in millions)*

|  | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Commercial Airplanes | **$2,379** | $(1,603) | **$1,017** | $(2,837) |
| Boeing Defense, Space & Security | **2,059** | 2,470 | **684** | 885 |
| Boeing Capital Corporation | **146** | 112 | **45** | 39 |
| Other segment | **(254)** | (105) | **(132)** | (36) |
| Unallocated items and eliminations | **(462)** | (471) | **(227)** | (202) |
| Total | **$3,868** | $403 | **$1,387** | $(2,151) |

Operating earnings for the nine and three months ended September 30, 2010 increased by $3,465 million and $3,538 million compared with the same periods in 2009. Commercial Airplanes earnings increased by $3,982 million and $3,854 million primarily due to the absence of $2,619 million of costs related to the first three 787 flight test aircraft included in research and development expense in 2009 and the absence of the 2009 reach-forward losses on the 747 program of $1,352 million and $1,005 million during the nine and three months ended September 30, 2009. BDS earnings decreased by $411 million and $201 million compared with the same periods in 2009 due to lower earnings in the BMA and N&SS segments, partially offset by higher earnings in the Global Services & Support (GS&S) segment. Other segment earnings for the nine and three months decreased by $149 million and $96 million primarily due to an $81 million aircraft impairment charge on 717 aircraft.

The most significant expense items not allocated to segments are shown in the table below:

*(Dollars in millions)*

|  | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Share-based plans expense | **$(112)** | $(140) | **$(22)** | $(24) |
| Deferred compensation expense | **(84)** | (134) | **(47)** | (88) |
| Other unallocated items and eliminations | **(294)** | (205) | **(167)** | (97) |
| Pension | **64** | 69 | **21** | 24 |
| Postretirement | **(36)** | (61) | **(12)** | (17) |
| Total | **$(462)** | $(471) | **$(227)** | $(202) |

Deferred compensation expense for the nine and three months ended September 30, 2010 decreased by $50 million and $41 million compared with the same periods of the prior year. The year over year changes in deferred compensation expense are primarily driven by changes in our stock price and broad stock market conditions.

Unallocated pension and other postretirement expense represents the difference between costs recognized under Generally Accepted Accounting Principles in the United States of America in the consolidated financial statements and federal cost accounting standards required to be utilized by our business segments for U.S. government contracting purposes. We recorded net periodic benefit cost related to pensions and other postretirement benefits of $1,430 million and $463 million for the nine and three months ended September 30, 2010 and $1,356 million and $452 million for the nine and three months ended September 30, 2009. Not all net periodic benefit cost is recognized in earnings in the period incurred. A portion of net periodic benefit cost is allocated to production as product cost and a portion remains in inventory at the end of the reporting period.

Other unallocated items and eliminations expense for the nine and three months ended September 30, 2010 increased by $89 million and $70 million compared with the same periods in 2009, primarily due to timing of intercompany expense allocations and elimination of profit on intercompany items.

Earnings from operations included the following net periodic benefit cost allocated to business segments and Other unallocated items and eliminations:

*(Dollars in millions)*

| Pension Plans | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Allocated to business segments | **(911)** | (725) | **(301)** | (254) |
| Other unallocated items and eliminations | **64** | 69 | **21** | 24 |
| Total | **$(847)** | $(656) | **$(280)** | $(230) |

*(Dollars in millions)*

| Other Postretirement Benefit Plans | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Allocated to business segments | **(340)** | (405) | **(112)** | (146) |
| Other unallocated items and eliminations | **(36)** | (61) | **(12)** | (17) |
| Total | **$(376)** | $(466) | **$(124)** | $(163) |

### Other Earnings Items

*(Dollars in millions)*

|  | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| **Earnings/(loss) from operations** | **$3,868** | $403 | **$1,387** | $(2,151) |
| Other income/(expense), net | **20** | 7 | **(13)** | (4) |
| Interest and debt expense | **(384)** | (229) | **(130)** | (92) |
| **Earnings/(loss) before income taxes** | **3,504** | 181 | **1,244** | (2,247) |
| Income tax (expense)/benefit | **(1,359)** | (129) | **(407)** | 687 |
| **Net earnings/(loss) from continuing operations** | **$2,145** | $52 | **$837** | $(1,560) |

Interest and debt expense for the nine and three months ended September 30, 2010 increased by $155 million and $38 million compared with the same periods of the prior year due to debt issued in 2009.

The effective tax rates were 38.8% and 32.7% for the nine and three months ended September 30, 2010 and 71.3% and 30.6% for the same periods in the prior year. The decrease in the effective tax rate for the nine months as compared with the same period of the prior year was primarily due to lower pre-tax earnings in 2009. This decrease was partially offset by an income tax charge of $150 recorded during the first quarter of 2010 as a result of the Patient Protection and Affordable Care Act, as modified by the Health Care and Education Reconciliation Act of 2010 and by U.S. research tax credit benefits that existed in 2009, but do not exist in 2010.

For additional discussion related to Income Taxes, see Note 4 to our Condensed Consolidated Financial Statements.

### Backlog

Contractual backlog of unfilled orders excludes purchase options, announced orders for which definitive contracts have not been executed and unobligated U.S. and non-U.S. government contract funding. The increase in contractual backlog during the nine months ended September 30, 2010 was primarily due to a net increase in commercial airplane orders.

Unobligated backlog consists of U.S. and foreign government definitive contracts for which funding has not been authorized and appropriated. The increase in unobligated backlog during the nine months ended September 30, 2010 was primarily due to multi-year procurement contract awards on the F-18 and International Space Station programs, partially offset by funding of existing multi-year contracts including the V-22, Chinook, C-17, Brigade Combat Team Modernization (BCTM) and Proprietary programs.

### Segment Results of Operations

### Commercial Airplanes

### Business Environment and Trends

**Airline Industry Environment** The fundamental drivers of air travel growth are a combination of economic growth and the increasing propensity to travel due to increased trade, globalization and improved airline services driven by liberalization of air traffic rights between countries. The air travel industry is vulnerable to near-term exogenous developments including global economic cycles, disease outbreaks, the threat of terrorism and fuel prices.

Monthly data indicates the airline industry recovery is progressing faster than previously forecasted due to an improved near-term economic outlook. The International Air Transport Association (IATA) now forecasts 2010 global passenger traffic growth of 8%, more than offsetting the estimated 2% decline in 2009 and representing growth over previous peak levels achieved in 2008. IATA’s December 2009 forecast predicted essentially no growth over 2008 levels in 2010. There is significant variation between regions and airline business models with emerging markets and low cost carriers leading the improved passenger traffic outlook. In addition, air cargo traffic is rebounding, growing 24% in the first half of 2010 driven by Asian exports. IATA now anticipates 20% cargo traffic growth in 2010 compared to 7% growth forecast nine months ago. Air cargo is now forecast to grow over previous 2007 peak levels in 2011. As a result of the improved demand outlook, IATA’s airline financial outlook has improved to $8.9 billion from the net losses expected in early 2010. IATA now forecasts all regions except Europe posting net profits in 2010.

### Operating Results

*(Dollars in millions)*

|  | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$23,650** | $24,868 | **$8,749** | $7,883 |
| Earnings from operations | **$2,379** | $(1,603) | **$1,017** | $(2,837) |
| Operating margins | **10.1%** | -6.4% | **11.6%** | -36.0% |

*(Dollars in millions)*

|  | September 30 2010 | December 31 2009 |
| --- | ---: | ---: |
| Contractual backlog | **$255,176** | $250,476 |

32

### Revenues

Year over year changes in Revenue are shown in the following table:

*(Dollars in millions)*

|  | Nine months ended September 30, 2010 vs. September 30, 2009 | Three months ended September 30, 2010 vs. September 30, 2009 |
| --- | ---: | ---: |
| New airplane sales | $(1,667) | $648 |
| Commercial aviation services business | 510 | 244 |
| Other | (61) | (26) |
| Total | $(1,218) | $866 |

Revenues for the nine months ended September 30, 2010 decreased by $1,218 million or 5% compared with the same period of 2009. The decrease in new airplane revenues primarily reflects lower deliveries on the 747 program due to the planned transition from the 747-400 to the 747-8 derivative and lower 777 deliveries primarily resulting from a production rate change to 5 per month beginning in June 2010. The increase in revenues from commercial aviation services business was primarily due to increased sales of spares and freighter conversions.

Revenues for the three months ended September 30, 2010 increased by $866 million or 11%, compared with the same period of 2009. This increase in revenue was primarily attributable to higher new airplane deliveries and an increase in commercial aviation services business driven by sales of spares and freighter conversions. Higher new airplane deliveries were partially the result of improvements on 737 and 777 supplier production challenges related to seats.

Commercial jet aircraft deliveries, including intercompany deliveries, were as follows:

|  |  |  |  |  |  |
| --- | ---: | ---: | ---: | ---: | ---: |
| **Program** | **737** | **747** | **767** | **777** | **Total** |
| Deliveries during the first nine months of 2010 | 281 |  | 9 | 56 | 346 |
| Deliveries during the first nine months of 2009 | 280 | 6 | 10 | 63 | 359 |
| Deliveries during the third quarter of 2010 | 100 |  | 3 | 21 | 124 |
| Deliveries during the third quarter of 2009 | 90 |  | 4 | 19 | 113 |
| Cumulative deliveries as of 9/30/2010 | 3,409 | 1,418 | 991 | 892 |  |
| Cumulative deliveries as of 12/31/2009 | 3,128 | 1,418 | 982 | 836 |  |

### Earnings From Operations

Earnings from operations for the nine and three months ended September 30, 2010 increased by $3,982 million and $3,854 million. These increases were primarily due to the absence of the 2009 reclassification from inventory to research and development expense of costs related to the first three 787 flight test aircraft, and the absence of the 2009 reach forward losses on the 747 program. Costs of $2,619 million included in research and development expense for the first three flight-test 787 airplanes were a result of our determination in August 2009 that these aircraft could not be sold, and were primarily responsible for the decrease in research and development expense of $2,540 million and $2,561 million. The reach forward losses on the 747 program of $1,352 million and $1,005 million for the nine and three months ended September 30, 2009 were primarily due to increased production costs and the difficult market conditions affecting the 747-8. The remaining net increase in earnings for the nine and three months ended September 30, 2010 was primarily attributable to changes in revenue.

### Backlog

The increase in contractual backlog during the nine months ended September 30, 2010 was due to orders in excess of deliveries and changes in projected revenue escalation, partially reduced by cancellations of orders. A number of our customers may have contractual remedies that may be implicated by program delays. We continue to address customer claims and requests for other contractual relief as they arise. However, once orders are included in firm backlog, orders remain in backlog until canceled or fulfilled, although the value of orders is adjusted as changes to price and schedule are agreed to with customers.

### Accounting Quantity

The accounting quantities, undelivered units under firm orders and percentage of anticipated orders included in the program accounting estimates as compared with the number of cumulative firm orders were as follows:

|  | Program |  |  |  |  |
| --- | ---: | ---: | ---: | ---: | ---: |
| **As of 9/30/2010** | **737** | **747** | **767** | **777** | **787** |
| Program accounting quantities | **5,000** | **1,524** | **1,048** | **1,150** | **\*** |
| Undelivered units under firm orders | **2,127** | **109** | **53** | **265** | **847** |
| Cumulative firm orders1 | **5,536** | **1,527** | **1,044** | **1,157** |  |
|  | Program |  |  |  |  |
| As of 12/31/2009 | 737 | 747 | 767 | 777 | 787 |
| Program accounting quantities | 4,600 | 1,499 | 1,035 | 1,100 | \* |
| Undelivered units under firm orders | 2,076 | 108 | 59 | 281 | 851 |
| Cumulative firm orders1 | 5,204 | 1,526 | 1,041 | 1,117 |  |

\* The accounting quantity for the 787 program will be determined in the quarter of first airplane delivery, targeted for first quarter of 2011.

1 Cumulative firm orders represent the cumulative number of commercial jet aircraft deliveries plus undelivered firm orders.

**737 Program** The accounting quantity for the 737 program increased by 400 units during the second quarter of 2010 due to the program’s normal progress of obtaining additional orders and delivering aircraft. During 2010, we announced that monthly production of the 737 will increase from 31.5 to 35 airplanes per month beginning in the first quarter of 2012 and will further increase to 38 airplanes per month beginning in the second quarter of 2013.

**747 Program** The accounting quantity for the 747 program increased by 25 units during the second quarter of 2010. During 2009 and 2008, we recorded charges of $1,352 million and $685 million to recognize reach-forward losses on the 747 program. First flight of the 747-8 Freighter occurred on February 8, 2010. A fourth aircraft was added to the flight test program in July 2010 to improve flight test efficiency. On September 30, 2010, we announced that the expected first delivery of the 747-8 Freighter would move to the middle of 2011 and a fifth airplane will be added to the flight test fleet to support the new schedule. The new delivery schedule follows an assessment of the expected cumulative impact of flight test discoveries, which include a low frequency vibration in certain flight conditions and an underperforming aileron actuator. While neither issue requires structural changes to the airplane, they have led to disruptions to certification testing, which the program was unable to offset within the prior schedule. This schedule change is not expected to have a material impact on our 2010 financial results. On March 19, 2010, we announced that we will accelerate, from mid-2013 to mid-2012, a planned production rate increase from 1.5 to 2 airplanes per month. Certification and first delivery of the Intercontinental passenger derivative is expected in the fourth quarter of 2011. Schedule and other risks inherent in the demanding flight test and certification phases of program development remain. The gap between the delivery of the last 747-400, which occurred in 2009, and first deliveries of the 747-8 will result in lower 747 program revenues in 2010 and in the first half of 2011.

**767 Program** The accounting quantity for the 767 program increased by 13 units during the second quarter of 2010.

**777 Program** The accounting quantity for the 777 program increased by 50 units during the second quarter of 2010. In April 2009, we announced that monthly production of the 777 will decline from 7 to 5 airplanes per month beginning in June 2010. The lower production rate from June 2010 through mid-2011 will decrease revenues and earnings in 2010 and 2011. On March 19, 2010, we announced that we will accelerate by approximately six months, from early 2012 to mid-2011, a planned production rate increase to 7 airplanes per month.

**787 Program** On August 27, 2010, we announced that the expected date of first delivery of the 787 has been moved to mid-first quarter 2011. The schedule revision followed an assessment of the cumulative impact of a number of issues, including supplier workmanship issues related to the horizontal stabilizer, instrumentation delays and the expected availability date of an engine needed to support the final phases of flight test.

The sixth flight test aircraft entered flight testing on October 4, 2010. We continue to expect to perform a limited amount of testing on two production-configured airplanes prior to first delivery. We continue to work toward our planned increases in 787 production rates as well as the timely introduction of the 787-9 derivative. Such efforts include the construction of a second assembly line in North Charleston, South Carolina and establishing transitional surge capacity at our Everett, Washington location. On July 1, 2010, we completed firm configuration of the 787-9 airplane with first delivery scheduled for late 2013.

During 2009, we concluded that the first three flight-test 787 aircraft could not be sold as previously anticipated due to the inordinate amount of rework and unique and extensive modifications made to those aircraft. As a result, costs associated with these aircraft were included in research and development expense. We believe that the other three 787 flight test aircraft are commercially saleable and we continue to include costs related to those aircraft in program inventory at September 30, 2010. If we determine that one or more of the other flight test aircraft cannot be sold, we may incur additional charges.

We continue to monitor and address other areas of challenge associated with assembly of initial airplanes including management of our extended global supply chain, completion and integration of traveled work as well as weight and systems integration. For example, during the second quarter of 2010 we delayed some 787 component deliveries to reduce out of sequence work moving into final assembly at our Everett factory and improve supply chain efficiency.

We continue to work with our customers and suppliers to assess the specific impacts of schedule changes, including delivery delays and supplier assertions. Efforts continue to ensure we remain focused on satisfying customer mission and performance needs in light of the anticipated weight of their respective aircraft. A number of our customers have contractual remedies for schedule delays and/or performance. We continue to address customer and supplier claims and requests for other contractual relief as brought forth.

The cumulative impacts of the production challenges, schedule delays and customer and supplier impacts create significant pressure on program revenue and cost estimates. We continue to assess our mitigation plans and cost-reduction efforts to address these pressures.

### Additional Considerations

The 787 and 747-8 programs highlight the risks that are always inherent in new airplane programs and new derivative airplanes, particularly as both the 747-8 and the 787 continue the demanding flight test and certification phases of program development. Costs related to development of new programs and derivative airplanes are expensed as incurred. Costs to produce new aircraft are included in inventory and accounted for using program accounting. Airplane programs have risk for reach-forward losses if our estimated production costs exceed our estimated program revenues for the accounting quantity. Generally commercial airplanes are sold on a firm fixed-price basis with an indexed price escalation clause and are often sold several years before scheduled delivery. Each customer purchase agreement contains an escalation clause to account for the effects of economic fluctuations over the period of time from airplane sale to airplane delivery. A price escalation formula based on pre-defined factors is used to determine the final price of the airplane at the time of customer delivery. While firm fixed-price contracts allow us to benefit from cost savings, they also expose us to the risk of cost overruns. Many new airplanes and derivatives have highly complex designs, utilize exotic materials and require extensive coordination and integration with supplier partners. As technical or quality issues arise, such as issues experienced on the 787 and 747-8 programs, we may experience schedule delays and higher costs to complete new programs and derivative aircraft. Additionally, price escalation factors may also impact margins by reducing the estimated price of airplanes delivered in the future. There are other factors that could also result in lower margins or a material charge if a program has or is determined to have reach-forward losses. These include: changes to the program accounting quantity, production costs and rates, capital expenditures and other costs associated with increasing or adding new production capacity, learning curve, anticipated cost reductions, flight test and certification schedules, costs, schedule and demand for derivative airplanes and status of customer claims, supplier assertions and other contractual negotiations. While we believe the cost and revenue estimates incorporated in the financial statements are appropriate, the technical complexity of these programs creates financial risk as additional completion costs may become necessary or scheduled delivery dates could be extended, which could trigger termination provisions, order cancellations or other financially significant exposure.

### Boeing Defense, Space & Security

### Business Environment and Trends

On January 7, 2010, we announced that Integrated Defense Systems will begin operating under the name Boeing Defense, Space & Security (BDS). BDS consists of three capabilities-driven businesses: Boeing Military Aircraft (BMA), Network & Space Systems (N&SS) and Global Services & Support (GS&S). Additionally, BDS Phantom Works supports all three businesses via product development, rapid prototyping and customer engagement through experimentation and enterprise technology investment strategies.

### BDS Realignment

Effective January 1, 2010, certain programs were realigned between BDS segments. Business segment data for all periods presented have been adjusted to reflect the realignment. See Note 14 to our Condensed Consolidated Financial Statements.

### Operating Results

*(Dollars in millions)*

|  | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$23,778** | $25,114 | **$8,182** | $8,744 |
| Earnings from operations | **$2,059** | $2,470 | **$684** | $885 |
| Operating margins | **8.7%** | 9.8% | **8.4%** | 10.1% |

*(Dollars in millions)*

|  | September 30 2010 | December 31 2009 |
| --- | ---: | ---: |
| Contractual backlog | **$46,295** | $46,024 |
| Unobligated backlog | **19,269** | 18,815 |

### Revenues

BDS revenues for the nine and three months ended September 30, 2010 decreased by $1,336 million and $562 million compared with the same periods in 2009. The decreases are primarily due to lower revenues in the N&SS segment for both the nine and three months and lower revenues in the BMA segment for the three months.

### Earnings From Operations

BDS earnings for the nine and three months ended September 30, 2010 decreased by $411 million and $201 million compared with the same periods in 2009, due to lower earnings in the BMA and N&SS segments, partially offset by higher earnings in the GS&S segment. Operating margins decreased by 1.1% and 1.7% compared with the same periods in 2009, primarily due to lower margins in the BMA and N&SS segments.

### Backlog

Total backlog is comprised of contractual backlog, which represents work we are on contract to perform for which we have received funding, and unobligated backlog, which represents work we are on contract to perform for which governmental funding has not yet been authorized and appropriated. BDS total backlog increased 1% in 2010, from $64,839 million to $65,564 million, due to multi-year procurement contract awards on the F-18 and International Space Station programs, partially offset by current year deliveries and sales on multi-year contracts awarded in prior years.

For further details on the changes between periods, refer to the discussions of the individual segments below.

### Additional Considerations

Our business includes a variety of development programs which have complex design and technical challenges. Many of these programs have cost-type contracting arrangements. In these cases the associated financial risks are primarily in lower profit rates or program cancellation if milestones and technical progress are not accomplished. Examples of these programs include Family of Beyond Line-of-Sight Terminals, BCTM, Ground-based Midcourse Defense (GMD), Joint Tactical Radio System, P-8A and Proprietary programs.

Some of our development programs are contracted on a fixed-price basis. Many of these programs have highly complex designs. As technical or quality issues arise, we may experience schedule delays and cost impacts, which could increase our estimated cost to perform the work or reduce our estimated price, either of which could result in a material charge. These programs are ongoing, and while we believe the cost and fee estimates incorporated in the financial statements are appropriate, the technical complexity of these programs creates financial risk as additional completion costs may become necessary or scheduled delivery dates could be extended, which could trigger termination provisions, the loss of satellite in-orbit incentive payments, or other financially significant exposure. These programs have risk for reach-forward losses if our estimated costs exceed our estimated contract revenues. Examples of these programs include Airborne Early Warning and Control (AEW&C), International P-8, International KC-767 Tanker, and commercial and military satellites.

### Boeing Military Aircraft

### Operating Results

*(Dollars in millions)*

|  | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$10,611** | $10,499 | **$3,790** | $4,000 |
| Earnings from operations | **$935** | $1,165 | **$312** | $480 |
| Operating margins | **8.8%** | 11.1% | **8.2%** | 12.0% |

*(Dollars in millions)*

|  | September 30 2010 | December 31 2009 |
| --- | ---: | ---: |
| Contractual backlog | **$25,683** | $26,354 |
| Unobligated backlog | **10,159** | 9,297 |

### Revenues

BMA revenues for the nine and three months ended September 30, 2010 increased by $112 million and decreased by $210 million, an increase of 1% and decrease of 5% compared with the same periods in 2009. Higher revenues on the Chinook, F-18 and AEW&C programs were partially offset in the nine month period by lower C-17 and Apache revenues. Revenues decreased during the three months ended September 30, 2010 primarily due to lower C-17 revenues.

Deliveries of units for new-build production aircraft, excluding remanufactures and modifications, were as follows:

|  | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| F/A-18 Models | **39** | 36 | **15** | 13 |
| F-15E Eagle | **10** | 10 | **3** | 4 |
| C-17 Globemaster | **10** | 12 | **4** | 5 |
| AH-64 Apache | **11** | 20 | **2** | 7 |
| CH-47 Chinook | **13** | 4 | **5** | 3 |
| AEW&C | **3** |  |  |  |
| International KC-767 Tanker |  | 1 |  |  |
| T-45TS Goshawk |  | 6 |  | 2 |
| Total new-build production aircraft | **86** | 89 | **29** | 34 |

38

### Earnings From Operations

BMA operating earnings for the nine and three months ended September 30, 2010 decreased by $230 million and $168 million, a 20% and 35% decrease from the same periods in 2009. The decreases in the nine and three month periods are primarily due to lower deliveries of C-17 aircraft and less favorable pricing and mix on the C-17 program.

### Backlog

BMA total backlog was $35,842 million at September 30, 2010, a 1% increase from December 31, 2009, primarily due to a multi-year contract award on the F-18 program and a fiscal year 2009 C-17 contract award, partially offset by deliveries and sales on multi-year contracts awarded in prior years.

### Additional Considerations

Items which could have a future impact on BMA operations include the following:

**AEW&C** The AEW&C development program, also known as Wedgetail in Australia, Peace Eagle in Turkey and Peace Eye in the Republic of Korea, consists of 737-700 aircraft outfitted with a variety of command and control and advanced radar systems, some of which have never been installed on an airplane before. Wedgetail includes six aircraft and Peace Eagle and Peace Eye include four aircraft each. During the nine months ended September 30, 2010 and 2009, we recorded charges increasing the reach-forward losses on the AEW&C program in Turkey by $49 million and $8 million. The 2010 and 2009 charges primarily related to schedule delays. During the second quarter of 2010, three Wedgetail aircraft were delivered to Australia with initial customer acceptance. Wedgetail final customer acceptance is scheduled to be completed in the third quarter of 2011. These are advanced and complex fixed-price development programs involving technical challenges at the individual subsystem level and in the overall integration of these subsystems into a reliable and effective operational capability. We believe that the cost and revenue estimates incorporated in the financial statements are appropriate; however, the technical complexity of the programs creates financial risk as additional completion costs may be necessary or scheduled delivery dates could be delayed.

**International KC-767 Tanker Program** The International KC-767 Tanker program includes four aircraft for the Italian Air Force and four aircraft for the Japanese Air Self Defense Force. The final delivery to Japan was made in December 2009. During the nine months ended September 30, 2010 and 2009, we recorded charges increasing the reach-forward losses on the International KC-767 Tanker programs by $50 million and $51 million. The Italian International KC-767 program is ongoing, and while we believe the revenue and cost estimates incorporated in the financial statements are appropriate, the technical complexity of the program creates financial risk as additional completion and development costs may be necessary or remaining scheduled delivery dates could be delayed.

**C-17** See the discussion of possible decision to complete C-17 production in Note 7 to our Condensed Consolidated Financial Statements.

### Network & Space Systems

### Operating Results

*(Dollars in millions)*

|  | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$7,021** | $8,492 | **$2,344** | $2,711 |
| Earnings from operations | **$493** | $698 | **$152** | $252 |
| Operating margins | **7.0%** | 8.2% | **6.5%** | 9.3% |

*(Dollars in millions)*

|  | September 30 2010 | December 31 2009 |
| --- | ---: | ---: |
| Contractual backlog | **$8,295** | $7,746 |
| Unobligated backlog | **9,045** | 9,187 |

### Revenues

N&SS revenues for the nine and three months ended September 30, 2010 decreased by $1,471 million and $367 million or 17% and 14% compared with the same periods in 2009. The decreases in both periods are primarily due to lower volume on the BCTM and GMD programs.

### Earnings From Operations

N&SS operating earnings for the nine and three months ended September 30, 2010 decreased by $205 million and $100 million, a 29% and 40% decrease from the same period in 2009. The earnings decreases are primarily due to lower revenues.

### Backlog

N&SS total backlog was $17,340 million at September 30, 2010, an increase of 2% from December 31, 2009. The increase is primarily due to a multi-year contract award on the International Space Station program and GMD contract awards, partially offset by revenues recognized on the BCTM program.

### Additional Considerations

Items which could have a future impact on N&SS operations include the following:

**United Launch Alliance** On December 1, 2006, we and Lockheed Martin Corporation (Lockheed) created a 50/50 joint venture named United Launch Alliance L.L.C. (ULA). ULA combines the production, engineering, test and launch operations associated with U.S. government launches of Boeing Delta and Lockheed Atlas rockets. We initially contributed net assets of $914 million at December 1, 2006. The book value of our investment exceeded our proportionate share of ULA’s net assets. This difference is expensed ratably in future years. Based on the adjusted contributions and the conformed accounting policies established by ULA, this amortization is expected to be approximately $15 million annually for the next 14 years.

In connection with the formation of ULA, we and Lockheed each committed to provide up to $200 million to support its working capital requirements through December 1, 2011. We and Lockheed transferred performance responsibility for certain U.S. government contracts to ULA as of the closing date. We and Lockheed agreed to jointly guarantee the performance of those contracts to the extent required by the U.S. government. We and Lockheed have also each committed to provide ULA with up to $197 million of additional capital contributions in the event ULA does not have sufficient funds to make a required payment to us under an inventory supply agreement. See Note 5 to our Condensed Consolidated Financial Statements.

We agreed to indemnify ULA through December 31, 2020 against potential non-recoverability and non-allowability of $1,360 million of Boeing Delta launch program inventory included in contributed assets plus $1,860 million of inventory subject to an inventory supply agreement which ends on March 31, 2021. Since inception, ULA has consumed $1,195 million of inventory that was contributed by us and has made advance payments of $240 million to us under the inventory supply agreement. We recorded revenues and cost of sales of $52 million under the inventory supply agreement through September 30, 2010. As part of its integration, ULA is continuing to assess the future of the Delta II program beyond what is currently on contract. In the event ULA is unable to sell additional Delta II inventory, earnings could be reduced by up to $70 million.

We agreed to indemnify ULA against potential losses that ULA may incur in the event ULA is unable to obtain certain additional contract pricing from the U.S. Air Force (USAF) for four satellite missions. We believe ULA is entitled to additional contract pricing. In December 2008, ULA submitted a claim to the USAF to re-price the contract value for two satellite missions. In March 2009, the USAF issued a denial of that claim and in June 2009, ULA filed an appeal. During 2009, the USAF exercised its option for a third satellite mission. During the third quarter of 2010, ULA submitted a claim to the USAF to re-price the contract value of the third mission. The USAF did not exercise an option for a fourth mission prior to expiration. If ULA is unsuccessful in obtaining additional pricing, we may be responsible for a portion of the shortfall and may record up to $283 million in pre-tax losses associated with the three missions, representing up to $261 million for the indemnification payment and up to $22 million for our portion of additional contract losses incurred by ULA.

**Sea Launch** See the discussion of the Sea Launch Chapter 11 Filing in Note 7 to our Condensed Consolidated Financial Statements.

**Satellites** See the discussions of Boeing Satellite Systems International, Inc. (BSSI) in Note 13 to our Condensed Consolidated Financial Statements.

### Global Services & Support

### Operating Results

*(Dollars in millions)*

|  | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$6,146** | $6,123 | **$2,048** | $2,033 |
| Earnings from operations | **$631** | $607 | **$220** | $153 |
| Operating margins | **10.3%** | 9.9% | **10.7%** | 7.5% |

*(Dollars in millions)*

|  | September 30 2010 | December 31 2009 |
| --- | ---: | ---: |
| Contractual backlog | **$12,317** | $11,924 |
| Unobligated backlog | **65** | 331 |

41

### Revenues

GS&S revenues for the nine and three months ended September 30, 2010 increased by $23 million and $15 million compared with the same periods in the prior year. The increases are primarily due to higher revenues on several Integrated Logistics (IL) programs, partially offset by lower revenues on several Maintenance, Modifications and Upgrades (MM&U) programs.

### Earnings From Operations

GS&S operating earnings for the nine and three months ended September 30, 2010 increased by $24 million and $67 million compared with the same periods in 2009 primarily due to a third quarter 2009 unfavorable contract adjustment.

### Backlog

GS&S total backlog was $12,382 million at September 30, 2010, an increase of 1% from December 31, 2009 primarily due to increases in MM&U programs, partially offset by decreases in Training Systems and Services programs.

### Boeing Capital Corporation

### Operating Results

*(Dollars in millions)*

|  | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$494** | $496 | **$170** | $166 |
| Earnings from operations | **$146** | $112 | **$45** | $39 |
| Operating margins | **30%** | 23% | **26%** | 23% |

### Revenues

BCC segment revenues consist principally of lease income from equipment under operating lease and interest from financing receivables and notes. BCC’s revenues for the nine and three months ended September 30, 2010, decreased $2 million and increased $4 million when compared with the same periods in 2009.

### Earnings From Operations

BCC’s operating earnings are presented net of interest expense, provision for losses, asset impairment expense, depreciation on leased equipment and other operating expenses. Operating earnings for the nine and three months ended September 30, 2010 increased by $34 million and $6 million compared with the same periods in 2009 primarily due to lower interest expense, lower asset impairment expense and a lower provision for losses.

### Financial Position

The following table presents selected financial data for BCC:

*(Dollars in millions)*

|  | September 30 2010 | December 31 2009 |
| --- | ---: | ---: |
| BCC customer financing and investment portfolio | **$4,967** | $5,666 |
| Valuation allowance as a % of total receivables | **3.3%** | 2.5% |
| Debt | **$3,499** | $4,075 |
| Debt-to-equity ratio | **5.0-to-1** | 5.8-to-1 |

42

BCC’s customer financing and investment portfolio at September 30, 2010 decreased from December 31, 2009 due to normal portfolio run-off and asset pre-payments. At September 30, 2010 and December 31, 2009, BCC had $621 million and $385 million of assets that were held for sale or re-lease, of which $54 million and $345 million had either executed term sheets with deposits or firm contracts to be sold or placed on lease. The increase was primarily due to BCC’s termination of aircraft leases with Aevovias Caribe S.A. de C.V. (Click), an affiliate of Compania Mexicana de Aviacion S.A. de C.V. (Mexicana), in August 2010. Additionally, aircraft subject to leases with a carrying value of approximately $115 million are scheduled to be returned off lease in the next 12 months. These aircraft are being remarketed or we are seeking to have the leases extended.

### Bankruptcies

In August 2010, Mexicana filed for bankruptcy protection in Mexico and the United States. At the time of those filings, BCC had leased and delivered 19 717 aircraft to Click, and 6 additional 717 aircraft were scheduled for delivery to Click under executed leases. On August 27, 2010, BCC served Click a notice of termination of all 25 leases as a result of non-payment. On or about August 28, 2010, Click ceased flight operations. In September 2010, Click filed for bankruptcy protection. We are currently seeking recovery of the 19 aircraft that had been delivered to Click. We recorded an $81 million net impairment charge related to certain 717 aircraft leased to Click. This charge was primarily recorded in the Other segment due to an intercompany guarantee between us and BCC. Additional impairment charges could be recorded if we are unable to re-lease the aircraft at anticipated rental rates.

### Restructurings and Restructuring Requests

From time to time, certain customers have requested a restructuring of their transactions with BCC. As of September 30, 2010, BCC has not reached agreement on any restructuring requests that would have a material adverse effect on its earnings, cash flows and/or financial position.

### Southwest/AirTran Merger

On September 26, 2010, Southwest Airlines Co. (Southwest) and AirTran Holdings, Inc. (AirTran) entered into an Agreement and Plan of Merger, whereby Southwest will acquire, subject to certain conditions, all of the outstanding common stock of AirTran. AirTran, together with its subsidiaries, represents approximately 25% of our gross customer financing portfolio carrying value, consisting principally of 717 aircraft. AirTran is the largest customer in terms of BCC’s segment revenue and customer financing portfolio carrying value. We are evaluating the planned merger and its potential impacts on our business.

### Other Segment

*(Dollars in millions)*

|  | Nine months ended September 30 2010 | 2009 | Three months ended September 30 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | **$107** | $125 | **$27** | $51 |
| Loss from operations | **(254)** | (105) | **(132)** | (36) |

Other segment losses for nine and three months ended September 30, 2010 increased by $149 million and $96 million compared with the same periods in 2009 primarily due to the $81 million aircraft impairment charge discussed above under Bankruptcies in the BCC segment. For the nine months ended September 30, 2010 higher environmental remediation expenses also contributed to the $149 million increase.

### Liquidity and Capital Resources

### Cash Flow Summary

*(Dollars in millions)*

|  | Nine months ended September 30 2010 | 2009 |
| --- | ---: | ---: |
| Net earnings | **$2,143** | $44 |
| Non-cash items | **1,688** | 1,668 |
| Changes in working capital | **(1,995)** | 679 |
| Net cash provided by operating activities | **1,836** | 2,391 |
| Net cash used by investing activities | **(6,480)** | (2,149) |
| Net cash (used)/provided by financing activities | **(1,645)** | 2,545 |
| Effect of exchange rate changes on cash and cash equivalents | **(62)** | 40 |
| Net (decrease)/increase in cash and cash equivalents | **(6,351)** | 2,827 |
| Cash and cash equivalents at beginning of year | **9,215** | 3,268 |
| Cash and cash equivalents at end of period | **$2,864** | $6,095 |

**Operating Activities** Net cash provided by operating activities of $1,836 million during the nine months ended September 30, 2010 decreased by $555 million compared to the same period in 2009 primarily due to higher net working capital in 2010. The net working capital increase was driven by growth in inventory as we continue to build inventories prior to the anticipated delivery and production ramp-up of the 787 and 747-8 programs.

**Investing Activities** Cash used by investing activities totaled $6,480 million during the nine months ended September 30, 2010 compared with $2,149 million used during the same period in 2009, largely due to net contributions to investments, primarily time deposits, of $5,088 million during the nine months ended September 30, 2010. In August 2010, we acquired Argon ST, Inc. for $782 million, net of cash acquired. This was partially offset by $240 million of lower capital spending on property, plant and equipment additions and the receipt of economic development program funds. For the full-year 2010, we expect capital spending to be higher than 2009 due to the construction of a second 787 final assembly line in North Charleston, South Carolina.

**Financing Activities** Cash used by financing activities totaled $1,645 million during the nine months ended September 30, 2010 compared with $2,545 million provided during the nine months ended September 30, 2009, primarily due to proceeds from borrowings of $3,772 million in 2009.

During the nine months ended September 30, 2010, we repaid $655 million of debt, including repayments of $621 million of debt held at BCC. The recorded balance of debt as of September 30, 2010 was $12,419 million, of which $953 million was classified as short-term. This includes $3,499 million of debt recorded at BCC, of which $825 million was classified as short-term.

During the nine months ended September 30, 2010, we did not repurchase any shares through our open market share repurchase program and had 442,878 shares transferred to us from employees for tax withholding. During the nine months ended September 30, 2009, we repurchased 1,173,152 shares at an average price of $42.94 in our open market share repurchase program and 429,245 shares were transferred to us from employees for tax withholding. Cash used for treasury share repurchases was $50 million for the nine months ended September 30, 2009.

**Capital Resources** We have substantial borrowing capacity. Any future borrowings may affect our credit ratings and are subject to various debt covenants. We and BCC have commercial paper programs that continue to serve as significant potential sources of short-term liquidity. As of

September 30, 2010, neither we nor BCC had any commercial paper borrowings outstanding. Currently, we have $3,550 million ($1,500 million exclusively available for BCC) of unused borrowing on revolving credit line agreements. We anticipate that these credit lines will primarily serve as backup liquidity to support possible commercial paper borrowings in the future.

In the event we require additional funding to support strategic business opportunities, our commercial aircraft financing commitments, unfavorable resolution of litigation or other loss contingencies, or other business requirements, we expect to meet increased funding requirements by issuing commercial paper or term debt. We believe our ability to access external capital resources should be sufficient to satisfy existing short-term and long-term commitments and plans, and also to provide adequate financial flexibility to take advantage of potential strategic business opportunities should they arise within the next year. However, there can be no assurance of the cost or availability of future borrowings, if any, under our commercial paper program, in the debt markets or our credit facilities.

As of September 30, 2010, we continue to be in full compliance with all covenants contained in our debt agreements. The most restrictive covenants include a limitation on mortgage debt and sale and leaseback transactions as a percentage of consolidated net tangible assets (as defined in the credit agreements), and a limitation on consolidated debt as a percentage of total capital (as defined). When considering such debt covenants, we continue to have substantial borrowing capacity.

### Off-Balance Sheet Arrangements

We are a party to certain off-balance sheet arrangements including certain guarantees. For discussion of these arrangements, see Note 8 to our Condensed Consolidated Financial Statements.

### Contingent Obligations

We have significant contingent obligations that arise in the ordinary course of business, which include the following:

**Legal** Various legal proceedings, claims and investigations are pending against us. Legal contingencies are discussed in Note 13 to our Condensed Consolidated Financial Statements, including our contesting the default termination of the A-12 aircraft, employment and benefits litigation brought by several of our current or former employees, litigation/arbitration involving BSSI and civil securities litigation.

**Environmental Remediation** We are involved with various environmental remediation activities and have recorded a liability of $743 million at September 30, 2010. For additional information, see Note 7 to our Condensed Consolidated Financial Statements.

**Income Taxes** We have recorded a net liability of $1,595 million at September 30, 2010 for uncertain tax positions. For further discussion of income taxes, see Note 4 to our Condensed Consolidated Financial Statements.

## Controls and procedures

As filed, 1,018 characters.

(a) Disclosure Controls and Procedures.

Our Chief Executive Officer and Chief Financial Officer have evaluated our disclosure controls and procedures as of September 30, 2010 and have concluded that these disclosure controls and procedures are effective to ensure that information required to be disclosed by us in the reports that we file or submit under the Securities Exchange Act of 1934, as amended, is recorded, processed, summarized and reported within the time periods specified in the Commission’s rules and forms and is accumulated and communicated to our management, including the Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

(b) Changes in Internal Control Over Financial Reporting.

There were no changes in our internal control over financial reporting that occurred during the third quarter of 2010 that have materially affected or are reasonably likely to materially affect our internal control over financial reporting.

## Risk factors

As filed, 181 characters.

There have been no material changes in our risk factors from those disclosed in Part I, Item 1A. Risk Factors in our Annual Report on Form 10-K for the year ended December 31, 2009.