## Figures reported in this filing

Standardized XBRL line items for the period ended 2010-12-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 12 months, 2010-01-01 to 2010-12-31 | $15.20bn | us-gaap:SalesRevenueNet |
| Operating income | 12 months, 2010-01-01 to 2010-12-31 | $5.70bn | us-gaap:OperatingIncomeLoss |
| Income tax | 12 months, 2010-01-01 to 2010-12-31 | $2.06bn | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 12 months, 2010-01-01 to 2010-12-31 | $2.81bn | us-gaap:NetIncomeLoss |
| Diluted EPS | 12 months, 2010-01-01 to 2010-12-31 | $4.76 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 12 months, 2010-01-01 to 2010-12-31 | $4.77 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 12 months, 2010-01-01 to 2010-12-31 | 590,100,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 12 months, 2010-01-01 to 2010-12-31 | $1.82bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 12 months, 2010-01-01 to 2010-12-31 | $3.38bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 12 months, 2010-01-01 to 2010-12-31 | $1.08bn | us-gaap:PaymentsOfDividendsCommonStock |
| Share repurchases | 12 months, 2010-01-01 to 2010-12-31 | $900.0m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2010-12-31 | $62.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2010-12-31 | $5.40bn | us-gaap:AssetsCurrent |
| Total assets | at 2010-12-31 | $42.82bn | us-gaap:Assets |
| Current liabilities | at 2010-12-31 | $5.77bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2010-12-31 | $30.56bn | us-gaap:Liabilities |
| Long-term debt | at 2010-12-31 | $15.76bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2010-12-31 | $497.0m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2010-12-31 | $1.39bn | us-gaap:CommercialPaper |
| Shareholders' equity | at 2010-12-31 | $12.00bn | us-gaap:StockholdersEquity |

## Business

As filed, 114,988 characters.

### GENERAL

*Dominion*, headquartered in Richmond, Virginia and incorporated in Virginia in 1983, is one of the nation’s largest producers and transporters of energy. Dominion’s strategy is to be a leading provider of electricity, natural gas and related services to customers primarily in the eastern region of the U.S. Dominion’s portfolio of assets includes approximately 27,615 MW of generating capacity, 6,100 miles of electric transmission lines, 56,800 miles of electric distribution lines, 11,000 miles of natural gas transmission, gathering and storage pipeline and 21,800 miles of gas distribution pipeline, exclusive of service lines of two inches in diameter or less. Dominion also owns the nation’s largest underground natural gas storage system, operates approximately 947 bcf of storage capacity and serves retail energy customers in 14 states.

Dominion is focused on expanding its investment in regulated electric generation, transmission and distribution and regulated natural gas transmission and distribution infrastructure within and around its existing footprint. As a result, regulated capital projects will continue to receive priority treatment in its spending plans. Dominion expects this will increase its earnings contribution from regulated operations, while reducing the sensitivity of its earnings to commodity prices.

In 2010, Dominion announced plans to invest more than $10 billion over the next five years to expand and improve its regulated electric and natural gas businesses. A substantial portion of this investment will be essential to meet the anticipated increase in electricity demand in its service territory. Other drivers for the capital investment program include the need to construct infrastructure to handle the expected increase in natural gas production from the Marcellus Shale formation and upgrades to its gas distribution and electric transmission and distribution network. Dominion also announced that it may invest up to an additional $2 billion in its electric generating fleet to meet potential new environmental requirements.

Dominion’s nonregulated operations include merchant generation, energy marketing and price risk management activities and retail energy marketing operations. Dominion’s operations are conducted through various subsidiaries, including Virginia Power.

*Virginia Power*, headquartered in Richmond, Virginia and incorporated in Virginia in 1909 as a Virginia public service corporation, is a regulated public utility that generates, transmits and distributes electricity for sale in Virginia and North Carolina. In Virginia, Virginia Power conducts business under the name “Dominion Virginia Power.” In North Carolina, it conducts business under the name “Dominion North Carolina Power” and serves retail customers located in the northeastern region of the state, excluding certain municipalities. In addition, Virginia Power sells electricity at wholesale prices to rural electric cooperatives, municipalities and into wholesale electricity markets. All of Virginia Power’s common stock is owned by Dominion.

Amounts disclosed for Dominion are inclusive of Virginia Power, where applicable.

### EMPLOYEES

As of December 31, 2010, Dominion had approximately 15,800 full-time employees, of which approximately 5,900 employees are subject to collective bargaining agreements. As of December 31, 2010, Virginia Power had approximately 6,800 full-time employees, of which approximately 3,000 employees are subject to collective bargaining agreements. See Note 23 for discussion of the Companies’ workforce reduction program.

### PRINCIPAL EXECUTIVE OFFICES

Dominion and Virginia Power’s principal executive offices are located at 120 Tredegar Street, Richmond, Virginia 23219 and their telephone number is (804) 819-2000.

### WHERE YOU CAN FIND MORE INFORMATION ABOUT DOMINION AND VIRGINIA POWER

Dominion and Virginia Power file their annual, quarterly and current reports, proxy statements and other information with the SEC. Their SEC filings are available to the public over the Internet at the SEC’s website at http://www.sec.gov. You may also read and copy any document they file at the SEC’s public reference room at 100 F Street, N.E., Washington, D.C. 20549. Please call the SEC at 1-800-SEC-0330 for further information on the public reference room.

Dominion and Virginia Power make their SEC filings available, free of charge, including the annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and any amendments to those reports, through Dominion’s internet website, www.dom.com, as soon as practicable after filing or furnishing the material to the SEC. You may also request a copy of these filings, at no cost, by writing or telephoning Dominion at: Corporate Secretary, Dominion, 120 Tredegar Street, Richmond, Virginia 23219, Telephone (804) 819-2000. Information contained on Dominion’s website is not incorporated by reference in this report.

### DISPOSITIONS

Following are significant divestitures by Dominion and Virginia Power during the last five years.

### SALE OF E&P PROPERTIES

In 2010, Dominion completed the sale of substantially all of its Appalachian E&P operations, including its rights to associated Marcellus acreage, to a newly-formed subsidiary of CONSOL for approximately $3.5 billion. See Note 4 to the Consolidated Financial Statements for additional information.

In 2007, Dominion completed the sale of its non-Appalachian natural gas and oil E&P operations and assets for approximately $13.9 billion.

In 2006, Dominion received approximately $393 million of proceeds from sales of certain gas and oil properties, primarily resulting from the sale of certain properties located in Texas and New Mexico.

The historical results of the non-Appalachian E&P operations are included in the Corporate and Other segment. The historical results of the Appalachian E&P operations are included in the Dominion Energy segment.

### SALE OF PEOPLES

In February 2010, Dominion completed the sale of Peoples to PNG Companies LLC and netted after-tax proceeds of approximately $542 million. The historical results of these operations are included in the Corporate and Other segment and presented in discontinued operations. See Note 4 to the Consolidated Financial Statements for additional information.

### ASSIGNMENT OF MARCELLUS ACREAGE

In 2008, Dominion completed a transaction with Antero to assign drilling rights to approximately 117,000 acres in the Marcellus Shale formation located in West Virginia and Pennsylvania. Dominion received proceeds of approximately $347 million. Under the agreement, Dominion received a 7.5% overriding royalty interest on future natural gas production from the assigned acreage. The overriding royalty interest was transferred to CONSOL as part of the sale of substantially all of Dominion’s Appalachian E&P operations in 2010.

### SALE OF MERCHANT FACILITIES

In March 2007, Dominion sold three Peaker facilities for net cash proceeds of $254 million. The Peaker facilities included the 625 MW Armstrong facility in Shelocta, Pennsylvania; the 600 MW Troy facility in Luckey, Ohio; and the 313 MW Pleasants facility in St. Mary’s, West Virginia. The results of these operations were presented in discontinued operations.

### SALE OF DRESDEN

In September 2007, Dominion completed the sale of Dresden to AEP Generating Company for $85 million.

### SALE OF CERTAIN DCI OPERATIONS

In March 2008, Dominion reached an agreement to sell its remaining interest in the subordinated notes of a third-party CDO entity held as an investment by DCI and in April 2008 received proceeds of $54 million, including accrued interest. As discussed in Note 25 to the Consolidated Financial Statements, Dominion deconsolidated the CDO entity as of March 31, 2008.

In August 2007, Dominion completed the sale of Gichner, LLC, all of the issued and outstanding shares of the capital stock of Gichner, Inc. (an affiliate of Gichner, LLC) and Dallastown for approximately $30 million.

### OPERATING SEGMENTS

Dominion manages its daily operations through three primary operating segments: DVP, Dominion Generation and Dominion Energy. Dominion also reports a Corporate and Other segment, which includes its corporate, service company and other functions (including unallocated debt) and the net impact of Peoples and certain DCI operations, which are discussed in Notes 4 and 25 to the Consolidated Financial Statements, respectively. In addition, Corporate and Other includes specific items attributable to Dominion’s operating segments that are not included in profit

measures evaluated by executive management in assessing the segments’ performance or allocating resources among the segments.

Virginia Power manages its daily operations through two primary operating segments: DVP and Dominion Generation. It also reports a Corporate and Other segment that primarily includes specific items attributable to its operating segments that are not included in profit measures evaluated by executive management in assessing the segments’ performance or allocating resources among the segments.

While daily operations are managed through the operating segments previously discussed, assets remain wholly-owned by Dominion and Virginia Power and their respective legal subsidiaries.

A description of the operations included in the Companies’ primary operating segments is as follows:

|  |  |  |  |
| --- | --- | --- | --- |
| Primary Operating Segment | Description of Operations | Dominion | Virginia Power |
| DVP | Regulated electric distribution | **X** | **X** |
|  | Regulated electric transmission | **X** | **X** |
|  | Nonregulated retail energy marketing (electric and gas) | **X** |  |
| Dominion Generation | Regulated electric fleet | **X** | **X** |
|  | Merchant electric fleet | **X** |  |
| Dominion Energy | Gas transmission and storage | **X** |  |
|  | Gas distribution and storage | **X** |  |
|  | LNG import and storage | **X** |  |
|  | Producer services | **X** |  |

For additional financial information on operating segments, including revenues from external customers, see Note 27 to the Consolidated Financial Statements. For additional information on operating revenue related to Dominion’s and Virginia Power’s principal products and services, see Notes 2 and 5 to the Consolidated Financial Statements.

### DVP

*The DVP Operating Segment of Virginia Power* includes Virginia Power’s regulated electric transmission and distribution (including customer service) operations, which serve residential, commercial, industrial and governmental customers in Virginia and North Carolina.

In December 2010, Virginia Power announced its five-year investment plan, which includes spending approximately $4 billion to upgrade or add new transmission and distribution lines, substations and other facilities to meet growing electricity demand within its service territory and maintain reliability. The proposed electric delivery infrastructure projects are intended to address both continued population growth and increases in electricity consumption by the typical consumer.

Revenue provided by electric distribution operations is based primarily on rates established by state regulatory authorities and state law. Changes in revenue are driven primarily by changes in rates, weather, customer growth and other factors impacting consumption such as the economy and energy conservation. Variability in earnings results from changes in rates, weather, the economy, customer growth and operating and maintenance expenditures. Operationally, electric distribution continues to focus on improving service levels while striving to reduce costs and link investments to operational results. As a result, electric service reliability and customer service have improved. SAIDI, excluding major storm events, has also steadily improved. The three-year average SAIDI has improved from 135 minutes at the end of 2005 to 114 minutes at the end of 2010. Likewise, ASA has also shown significant improvement. The three-year average ASA has improved from 73 seconds at the end of 2005 to 42 seconds at the end of 2010. Customer service options are also being enhanced and expanded through the use of technology. Customers now have the ability to use the Internet for routine billing and payment transactions, connecting and disconnecting service, reporting outages and obtaining outage updates. As electric distribution moves forward, safety, electric service reliability and customer service will remain key focal areas.

Revenue provided by Virginia Power’s electric transmission operations is based primarily on rates approved by FERC. The profitability of this business is dependent on its ability, through the rates it is permitted to charge, to recover costs and earn a reasonable return on its capital investments. Variability in earnings results from changes in rates and the timing of property additions, retirements and depreciation.

Virginia Power is a member of PJM, an RTO, and its electric transmission facilities are integrated into PJM wholesale electricity markets. Consistent with the increased authority given to NERC by EPACT, Virginia Power’s electric transmission operations are committed to meeting NERC standards, modernizing their infrastructure and maintaining superior system reliability. Virginia Power’s electric transmission operations will continue to focus on safety, operational performance, NERC compliance and execution of PJM’s RTEP.

*The DVP Operating Segment of Dominion* includes all of Virginia Power’s regulated electric transmission and distribution operations as discussed above, as well as Dominion’s nonregulated retail energy marketing operations.

Dominion’s retail energy marketing operations compete in nonregulated energy markets and have continued to experience customer growth during the past few years. The retail business requires limited capital investment and currently employs approximately 160 people. The retail customer base is diversified across three product lines—natural gas, electricity and home warranty services. In natural gas, Dominion has a heavy concentration of customers in markets where utilities have a long-standing commitment to customer choice. In electricity, Dominion pursues markets where utilities have divested of generation assets and where customers are permitted and have opted to purchase from the market. Major growth drivers are customer additions, new markets, products and sales channels and supply optimization.

### COMPETITION

#### DVP Operating Segment—Dominion and Virginia Power

Within Virginia Power’s service territory in Virginia and North Carolina, there is no competition for electric distribution service. Additionally, since its electric transmission facilities are integrated into PJM, electric transmission services are administered by PJM and are not subject to competition in relation to transmission service provided to customers within the PJM region. Virginia Power is seeing continued growth in new customers in its transmission and distribution operations.

#### DVP Operating Segment—Dominion

Dominion’s retail energy marketing operations compete against incumbent utilities and other energy marketers in nonregulated energy markets for natural gas and electricity. Customers in these markets have the right to select a retail marketer and typically do so based upon price savings or price stability; however, incumbent utilities have the advantage of long-standing relationships with their customers and greater name recognition in their markets.

### REGULATION

Virginia Power’s electric retail service, including the rates it may charge to jurisdictional customers, is subject to regulation by the Virginia Commission and the North Carolina Commission. Virginia Power’s electric transmission rates, tariffs and terms of service are subject to regulation by FERC. Electric transmission siting authority remains the jurisdiction of the Virginia and North Carolina Commissions. However, EPACT provides FERC with certain backstop authority for transmission siting. See *State Regulations* and *Federal Regulations* in *Regulation* for additional information.

The Virginia General Assembly enacted legislation in April 2007 that instituted a modified cost-of-service rate model for the Virginia jurisdiction of Virginia Power’s utility operations, subject to base rate caps in effect through December 31, 2008. Pursuant to this legislation, the Virginia Commission initiated a review of Virginia Power’s base rates in 2009. A discussion of Virginia Power’s settlement of this case with the Virginia Commission is contained in *Electric Regulation in Virginia* under *Regulation.*

### PROPERTIES

Virginia Power has approximately 6,100 miles of electric transmission lines of 69 kV or more located in the states of North Carolina, Virginia and West Virginia. Portions of Virginia Power’s electric transmission lines cross national parks and forests under permits entitling the federal government to use, at specified charges, any surplus capacity that may exist in these lines. While Virginia Power owns and maintains its electric transmission facilities, they are a part of PJM, which coordinates the planning, operation, emergency assistance and exchange of capacity and energy for such facilities.

Each year, as part of PJM’s RTEP process, reliability projects are authorized. Virginia Power is involved in two of the major construction projects authorized in 2006, which are designed to improve the reliability of service to customers and the region—Meadow Brook-to-Loudoun and Carson-to-Suffolk.

In October 2008, the Virginia Commission authorized construction of the Meadow Brook-to-Loudoun line and affirmed the 65-mile route proposed for the line which is adjacent to, or within, existing transmission line rights-of-way. The Virginia Commission’s approval of the Meadow Brook-to-Loudoun line was conditioned on the respective state commission approvals of both the West Virginia and Pennsylvania portions of the transmission line. The West Virginia Commission’s approval of Trans-Allegheny Interstate Line Company’s application became effective in February 2009 and the Pennsylvania Commission granted approval in December 2008. On appeal by the ECCP, the Pennsylvania Commonwealth Court affirmed in May 2010 the Pennsylvania Commission’s approval and subsequently denied a request for reargument by the ECCP in June 2010. The Meadow

Brook-to-Loudoun line is expected to cost approximately $255 million and be completed in June 2011.

In October 2008, the Virginia Commission authorized the construction of the Carson-to-Suffolk line. This project is estimated to cost $224 million and is expected to be completed in June 2011.

As part of subsequent annual PJM RTEP processes, PJM authorized additional electric transmission upgrade projects including Hayes-to-Yorktown in December 2008 and Mt. Storm-to-Doubs in December 2010. In June 2010, the Virginia Commission authorized the construction of the Hayes-to-Yorktown line along the proposed eight-mile route utilizing existing easements and property previously acquired for the transmission line right-of-way. In accordance with the Virginia Commission’s approval, approximately 4.2 miles of the Hayes-to-Yorktown line will be constructed overhead and approximately 3.8 miles will be installed underground in order to cross under the York River. The Hayes-to-Yorktown line is expected to cost approximately $63 million and, subject to receipt of all regulatory approvals, is expected to be completed by June 2012.

After more than 44 years of operation, portions of the 99-mile Mt. Storm-to-Doubs line and certain associated facilities are approaching the end of their expected service lives and require replacement with new facilities to maintain reliable service. Virginia Power owns and has been designated by PJM to rebuild the 96 miles of the line in West Virginia and Virginia, and The Potomac Edison Company owns and has been designated by PJM to rebuild the remaining three miles of the line in Maryland. Subject to applicable state and federal regulatory approvals, Virginia Power’s portion of the rebuild project is expected to cost approximately $300 million and is expected to be completed by June 2015.

In addition, Virginia Power’s electric distribution network includes approximately 56,800 miles of distribution lines, exclusive of service level lines, in Virginia and North Carolina. The grants for most of its electric lines contain rights-of-way that have been obtained from the apparent owner of real estate, but underlying titles have not been examined. Where rights-of-way have not been obtained, they could be acquired from private owners by condemnation, if necessary. Many electric lines are on publicly-owned property, where permission to operate can be revoked.

### SOURCES OF ENERGY SUPPLY

#### DVP Operating Segment—Dominion and Virginia Power

DVP’s supply of electricity to serve Virginia Power customers is produced or procured by Dominion Generation. See *Dominion Generation* for additional information.

#### DVP Operating Segment—Dominion

The supply of electricity to serve Dominion’s retail energy marketing customers is procured through market wholesalers and RTO or ISO transactions. DVP’s supply of gas to serve its customers is procured through market wholesalers or by Dominion Energy. See *Dominion Energy* for additional information.

### SEASONALITY

#### DVP Operating Segment—Dominion and Virginia Power

DVP’s earnings vary seasonally as a result of the impact of changes in temperature and the availability of alternative sources for heating on demand by residential and commercial customers. Generally, the demand for electricity peaks during the summer and winter months to meet cooling and heating needs. An increase in heating degree-days for DVP’s electric utility related operations does not produce the same increase in revenue as an increase in cooling degree-days, due to seasonal pricing differentials and because alternative heating sources are more readily available.

#### DVP Operating Segment—Dominion

The earnings of Dominion’s retail energy marketing operations also vary seasonally. Generally, the demand for electricity peaks during the summer and winter months to meet cooling and heating needs, while the demand for gas peaks during the winter months to meet heating needs.

### Dominion Generation

*The Dominion Generation Operating Segment of Virginia Power* includes the generation operations of the Virginia Power regulated electric utility and its related energy supply operations. Virginia Power’s utility generation operations primarily serve the supply requirements for the DVP segment’s utility customers. The generation mix is diversified and includes coal, nuclear, gas, oil and renewables. The generation facilities of Virginia Power’s electric utility fleet are located in Virginia, West Virginia and North Carolina. As discussed in *Properties*, Virginia Power has plans to add additional generation capacity to satisfy future growth in its utility service area.

Earnings for the Generation operating segment of Virginia Power primarily result from the sale of electricity generated by its utility fleet. Revenue is based primarily on rates established by state regulatory authorities and state law. Approximately 80% of revenue comes from serving Virginia jurisdictional customers. Rates for the Virginia jurisdiction are set using a modified cost-of-service rate model, subject to base rate caps that were in effect through December 31, 2008. The cost of fuel and purchased power is generally collected through fuel cost-recovery mechanisms established by regulators and does not materially impact net income. Variability in earnings for Virginia Power’s generation operations results from changes in rates, the demand for services, which is primarily weather dependent, and labor and benefit costs, as well as the timing, duration and costs of scheduled and unscheduled outages. See *Regulation—State Regulations* for additional information, including a discussion of Virginia Power’s 2009 base rate case settlement with the Virginia Commission.

*The Dominion Generation Operating Segment of Dominion* includes Virginia Power’s generation facilities and its related energy supply operations described above as well as the generation operations of Dominion’s merchant fleet and energy marketing and price risk management activities for these assets. The generation facilities of Dominion’s merchant fleet are located in Connecticut, Illinois, Indiana, Massachusetts, Pennsylvania, Rhode Island, West Virginia and Wisconsin. The Generation operating segment of Dominion derives its earnings primarily from the sale of electricity generated by Virginia Power’s utility and Dominion’s merchant generation assets, as well as associated capacity from Dominion’s merchant generation assets.

Variability in earnings provided by Dominion’s merchant fleet relates to changes in market-based prices received for electricity and capacity. Market-based prices for electricity are largely dependent on commodity prices, primarily natural gas, and the demand for electricity, which is primarily dependent upon weather. Capacity prices are dependent upon resource requirements in relation to the supply available (both existing and new) in the forward capacity auctions, which are held approximately three years in advance of the associated delivery year. Dominion manages electric and capacity price volatility of its merchant fleet by hedging a substantial portion of its expected near-term sales with derivative instruments and also entering into long-term power sales agreements. However, earnings have been adversely impacted due to a sustained decline in commodity prices. Variability also results from changes in the cost of fuel consumed, labor and benefits and the timing, duration and costs of scheduled and unscheduled outages.

### COMPETITION

#### Dominion Generation Operating Segment—Dominion and Virginia Power

Virginia Power’s generation operations are not subject to significant competition as only a limited number of its Virginia jurisdictional electric utility customers have retail choice. See *Regulation—State Regulations—Electric* for more information. Currently, North Carolina does not offer retail choice to electric customers.

#### Dominion Generation Operating Segment—Dominion

Unlike Dominion Generation’s regulated generation fleet, its merchant generation fleet is dependent on its ability to operate in a competitive environment and does not have a predetermined rate structure that allows for a rate of return on its capital investments. Competition for the merchant fleet is impacted by electricity and fuel prices, new market entrants, construction by others of generating assets and transmission capacity, technological advances in power generation, the actions of environmental and other regulatory authorities and other factors. These competitive factors may negatively impact the merchant fleet’s ability to profit from the sale of electricity and related products and services.

Dominion Generation’s merchant generation fleet owns and operates several facilities in the Midwest that operate within functioning RTOs. A significant portion of the output from these facilities is sold under long-term contracts, with expiration dates ranging from December 31, 2012 to August 31, 2017, and is therefore largely unaffected by price competition during the term of these contracts. Following expiration of these contracts, earnings could be adversely impacted if prevailing prices for energy, capacity and ancillary services are lower than the levels currently received under these contracts.

Dominion Generation’s other merchant assets also operate within functioning RTOs and primarily compete on the basis of price. Competitors include other generating assets bidding to operate within the RTOs. These RTOs have clearly identified

market rules that ensure the competitive wholesale market is functioning properly. Dominion Generation’s merchant units have a variety of short- and medium-term contracts, and also compete in the spot market with other generators to sell a variety of products including energy, capacity and ancillary services. It is difficult to compare various types of generation given the wide range of fuels, fuel procurement strategies, efficiencies and operating characteristics of the fleet within any given RTO. However, Dominion applies its expertise in operations, dispatch and risk management to maximize the degree to which its merchant fleet is competitive compared to similar assets within the region.

### REGULATION

Virginia Power’s utility generation fleet and Dominion’s merchant generation fleet are subject to regulation by FERC, the NRC, the EPA, the DOE, the Army Corps of Engineers and other federal, state and local authorities. Virginia Power’s utility generation fleet is also subject to regulation by the Virginia Commission and the North Carolina Commission. See *State Regulations* and *Federal Regulations* in *Regulation* for more information.

### PROPERTIES

For a listing of Dominion’s and Virginia Power’s existing generation facilities, see Item 2. Properties.

#### Dominion Generation Operating Segment—Dominion and Virginia Power

Based on available generation capacity and current estimates of growth in customer demand in its utility service area, Virginia Power will need additional generation capacity over the next decade. Virginia Power has announced a comprehensive generation growth program, referred to as *Powering Virginia*, which involves the development, financing, construction and operation of new multi-fuel, multi-technology generation capacity to meet the anticipated growing demand in its core market in Virginia. Significant projects under construction or development include:

Ÿ Bear Garden, which, once operational, will generate about 580 MW. This intermediate, combined-cycle, natural gas-fired power station and transmission interconnection line is estimated to cost $619 million, excluding financing costs. Construction is approximately 94% complete as of January 2011, with commercial operations expected to commence in the second quarter of 2011.

Ÿ The Virginia City Hybrid Energy Center located in Wise County, Virginia, which once operational, will generate about 585 MW. The baseload facility is estimated to cost $1.8 billion, excluding financing costs. Construction is approximately 79% complete as of January 2011, and commercial operations are expected to commence in the summer of 2012.

Ÿ A power station development project in Warren County, Virginia, intended to be developed as an intermediate, combined-cycle, natural gas-fired power station. In December 2010, the Virginia Department of Environmental Quality approved an air permit to construct the project. Subject to the receipt of additional regulatory approvals, the project is expected to generate more than 1,300 MW of electricity. If the project is approved, construction would begin in 2012, with commercial operations expected to commence by late 2014 or early 2015.

In addition to the projects above, Virginia Power is considering the construction of a third nuclear unit at a site located at North Anna, which Virginia Power owns along with ODEC. Virginia Power and ODEC have obtained an Early Site Permit for the North Anna site from the NRC. In November 2007, Virginia Power, along with ODEC, filed an application with the NRC for a COL that references a specific reactor design and which would allow Virginia Power to build and operate a new nuclear unit at North Anna. In May 2010, Virginia Power announced its decision to replace the reactor design previously selected for the potential third nuclear unit with the US-APWR technology.

In June 2010, Virginia Power and ODEC amended the COL application to reflect the selection of the US-APWR technology. In January 2011, Virginia Power and the DOE terminated their cooperative agreement to share equally the cost of developing a COL. The agreement references the technology previously selected by Virginia Power. DOE funding is not available under the agreement for activities related to the US-APWR technology. During the third and fourth quarters of 2010, Virginia Power filed several applications for environmental permits that would be needed to support future construction and operation of a third nuclear unit at North Anna.

Virginia Power has not yet committed to building a new nuclear unit at North Anna. In October 2010, Virginia Power announced its decision to slow the development of the potential third reactor. Virginia Power will continue to pursue the COL, along with engineering and preliminary site development work, and will reassess a construction schedule prior to the issuance of the COL currently anticipated in 2013. In December 2010, Virginia Power and MNES reached an agreement regarding pre-construction, engineering, design and planning work in preparation for a possible new unit at North Anna. In February 2011, ODEC informed Virginia Power of its intent to no longer participate in the development of the new unit at North Anna. Virginia Power and ODEC are currently working together to finalize the terms and conditions of such withdrawal.

If Virginia Power decides to build the new unit, it must first receive a COL from the NRC, the approval of the Virginia Commission and certain environmental permits and other approvals. The NRC is required to conduct a hearing in all COL proceedings. In August 2008, the ASLB of the NRC permitted BREDL to intervene in the proceeding. All of BREDL’s previous contentions in this proceeding have been dismissed. In October 2010, BREDL submitted two new contentions that it seeks to litigate that Virginia Power has opposed. No other persons sought to intervene in the proceeding. Absent additional admitted contentions, the mandatory NRC hearing will be uncontested with respect to other issues.

In April 2008, Virginia Power announced a joint effort with BP to evaluate wind energy projects in Virginia. In December 2010, Virginia Power and BP terminated their joint development agreement for wind energy projects. As a result of the termination, Virginia Power has acquired a sole development interest in several wind energy development projects in Virginia. Virginia Power paid BP approximately $1.5 million to acquire BP’s interest in property jointly owned in Tazewell County, Virginia.

#### Dominion Generation Operating Segment—Dominion

Dominion is a 50% owner with BP of the first phase of Fowler Ridge. Phase one has generating capacity of 300 MW and is in full commercial operation. In December 2009, Dominion closed on an agreement with BP to split the 350 MW of development assets associated with the second phase of Fowler Ridge, with Dominion retaining 150 MW of these development assets. In December 2010, Dominion reached an agreement to sell its 150 MW share of the development assets of the second phase to BP. Closing is subject to the approvals of FERC and the Indiana Utility Regulatory Commission, which are expected by the second quarter of 2011. Dominion will receive approximately $6 million of proceeds from the sale.

### SOURCES OF ENERGY SUPPLY

#### Dominion Generation Operating Segment—Dominion and Virginia Power

Dominion Generation uses a variety of fuels to power its electric generation and purchases power for utility system load requirements and to satisfy physical forward sale requirements, as described below. Some of these agreements have fixed commitments and are included as contractual obligations in *Future Cash Payments for Contractual Obligations and Planned Capital Expenditures* in Item 7. MD&A.

*Nuclear Fuel—*Dominion Generation primarily utilizes long-term contracts to support its nuclear fuel requirements. Worldwide market conditions are continuously evaluated to ensure a range of supply options at reasonable prices which are dependent on the market environment. Current agreements, inventories and spot market availability are expected to support current and planned fuel supply needs. Additional fuel is purchased as required to ensure optimal cost and inventory levels.

*Fossil Fuel—*Dominion Generation primarily utilizes coal, oil and natural gas in its fossil fuel plants. Dominion Generation’s coal supply is obtained through long-term contracts and short-term spot agreements from both domestic and international suppliers.

Dominion Generation’s natural gas and oil supply is obtained from various sources including: purchases from major and independent producers in the Mid-Continent and Gulf Coast regions, purchases from local producers in the Appalachian area, purchases from gas marketers and withdrawals from underground storage fields owned by Dominion or third parties.

Dominion Generation manages a portfolio of natural gas transportation contracts (capacity) that allows flexibility in delivering natural gas to its gas turbine fleet, while minimizing costs.

*Purchased Power—*Dominion Generation purchases electricity from the PJM spot market and through power purchase agreements with other suppliers to provide for utility system load requirements.

Dominion Generation also occasionally purchases electricity from the PJM, ISO-NE and MISO spot markets to satisfy physical forward sale requirements as part of its merchant generation operations.

#### Dominion Generation Operating Segment—Virginia Power

Presented below is a summary of Virginia Power’s actual system output by energy source:

|  | 2010 Source | 2009 Source | 2008 Source |
| --- | ---: | ---: | ---: |
| Coal(1) | **31%** | 33% | 33% |
| Purchased power, net | **29** | 25 | 29 |
| Nuclear(2) | **28** | 32 | 31 |
| Natural gas | **10** | 9 | 6 |
| Other(3) | **2** | 1 | 1 |
| Total | **100%** | 100% | 100% |

*(1) Excludes ODEC’s 50.0% ownership interest in the Clover power station. The average cost of coal for 2010 Virginia in-system generation was $36.25 per MWh.*

#### (2) Excludes ODEC’s 11.6% ownership interest in North Anna.

#### (3) Includes oil, hydro and biomass.

### SEASONALITY

Sales of electricity for Dominion Generation typically vary seasonally as a result of the impact of changes in temperature and the availability of alternative sources for heating on demand by residential and commercial customers. Generally, the demand for electricity peaks during the summer and winter months to meet cooling and heating needs. An increase in heating degree-days does not produce the same increase in revenue as an increase in cooling degree-days, due to seasonal pricing differentials and because alternative heating sources are more readily available.

### NUCLEAR DECOMMISSIONING

#### Dominion Generation Operating Segment—Dominion and Virginia Power

Virginia Power has a total of four licensed, operating nuclear reactors at Surry and North Anna in Virginia.

Decommissioning involves the decontamination and removal of radioactive contaminants from a nuclear power station once operations have ceased, in accordance with standards established by the NRC. Amounts collected from ratepayers and placed into trusts have been invested to fund the expected future costs of decommissioning the Surry and North Anna units.

Virginia Power believes that the decommissioning funds and their expected earnings for the Surry and North Anna units will be sufficient to cover expected decommissioning costs, particularly when combined with future ratepayer collections and contributions to these decommissioning trusts, if such future collections and contributions are required. This reflects the long-term investment horizon, since the units will not be decommissioned for decades, and a positive long-term outlook for trust fund investment returns. Virginia Power will continue to monitor these trusts to ensure they meet the NRC’s minimum financial assurance requirement, which may include the use of parent company guarantees, surety bonding or other financial guarantees recognized by the NRC.

The total estimated cost to decommission Virginia Power’s four nuclear units is $2.2 billion in 2010 dollars and is primarily based upon site-specific studies completed in 2009. The current cost estimates assume decommissioning activities will begin shortly after cessation of operations, which will occur when the operating licenses expire. Virginia Power expects to decommission the Surry and North Anna units during the period 2032 to 2067.

#### Dominion Generation Operating Segment—Dominion

In addition to the four nuclear units discussed above, Dominion has three other licensed, operating nuclear reactors: two at Millstone in Connecticut and one at Kewaunee in Wisconsin. A third Millstone unit ceased operations before Dominion acquired the power station. As part of Dominion’s acquisition of both Millstone and Kewaunee, it acquired decommissioning funds for the related units. Any funds remaining in Kewaunee’s trust after decommissioning is completed are required to be refunded to Wisconsin ratepayers.

Dominion believes that the amounts currently available in the decommissioning trusts and their expected earnings will be sufficient to cover expected decommissioning costs for the Millstone and Kewaunee units. Dominion will continue to monitor these trusts to ensure they meet the NRC’s minimum financial assurance requirement, which may include the use of parent company guarantees, surety bonding or other financial guarantees recognized by the NRC. The total estimated cost to decommission Dominion’s eight units is $4.6 billion in 2010 dollars and is primarily based upon site-specific studies completed in 2009. For the Millstone and Kewaunee operating units, the current cost estimate assumes decommissioning activities will begin shortly after cessation of operations, which will occur when the operating licenses expire. Millstone Unit 1 is not in service and selected minor decommissioning activities are being performed. This unit will continue to be monitored until full decommissioning activities begin for the remaining Millstone operating units. Dominion expects to start minor decommissioning activities at Millstone Unit 2 in 2035, with full decommissioning of Millstone Units 1, 2 and 3 during the period 2045 to 2069.

In August 2008, Dominion filed an application with the NRC to renew the Kewaunee operating license. In February 2011, the NRC renewed the operating license, extending Kewaunee’s operation an additional 20 years through 2033. Full decommissioning of Kewaunee is expected during the period 2033 to 2065.

The estimated decommissioning costs and license expiration dates for the nuclear units owned by Dominion and Virginia Power are shown in the following table.

*(dollars in millions)*

| Surry | NRC license expiration year | Most recent cost estimate (2010 dollars) | Funds in trusts at December 31, 2010 | 2010 contributions to trusts |
| --- | --- | ---: | ---: | ---: |
| Unit 1 | **2032** | **$541** | **$373** | **$1.1** |
| Unit 2 | **2033** | **562** | **368** | **1.2** |
| North Anna |  |  |  |  |
| Unit 1(1) | **2038** | **550** | **298** | **0.8** |
| Unit 2(1) | **2040** | **564** | **280** | **0.8** |
| Total (Virginia Power) |  | **2,217** | **1,319** | **3.9** |
| Millstone |  |  |  |  |
| Unit 1(2) | **n/a** | **424** | **317** | **—** |
| Unit 2 | **2035** | **651** | **385** | **—** |
| Unit 3(3) | **2045** | **680** | **374** | **—** |
| Kewaunee |  |  |  | **—** |
| Unit 1(4) | **2013** | **658** | **502** | **—** |
| Total (Dominion) |  | **$4,630** | **$2,897** | **$3.9** |

*(1) North Anna is jointly owned by Virginia Power (88.4%) and ODEC (11.6%). However, Virginia Power is responsible for 89.26% of the decommissioning obligation. Amounts reflect 100% of the decommissioning cost for both of North Anna’s units.*

*(2) Unit 1 ceased operations in 1998, before Dominion’s acquisition of Millstone.*

*(3) Millstone Unit 3 is jointly owned by Dominion, Massachusetts Municipal Wholesale Electric Company and Central Vermont Public Service Corporation, who hold a 6.53% undivided interest in Unit 3. Amounts reflect 100% of the decommissioning cost for Millstone Unit 3.*

*(4) Kewaunee Unit 1 original license expiration year is 2013, however, the cost estimate is based on the license renewal expiration year of 2033.*

### Dominion Energy

Dominion Energy includes Dominion’s regulated natural gas distribution companies, regulated gas transmission pipeline and storage operations, natural gas gathering and by-products extraction activities and regulated LNG operations. Dominion Energy also includes producer services, which aggregates natural gas supply, engages in natural gas trading and marketing activities and natural gas supply management and provides price risk management services to Dominion affiliates.

The gas transmission pipeline and storage business serves gas distribution businesses and other customers in the Northeast, mid-Atlantic and Midwest. Included in Dominion’s gas transmission pipeline and storage business is its gas gathering and extraction activity, which sells extracted products at market rates. Revenue provided by Dominion’s regulated gas transmission and storage and LNG operations is based primarily on rates established by FERC. Dominion’s gas distribution operations serve residential, commercial and industrial gas sales and transportation customers. Revenue provided by its gas distribution operations is based primarily on rates established by the Ohio and West Virginia Commissions. The profitability of these businesses is dependent on Dominion’s ability, through the rates it is permitted to charge, to recover costs and earn a reasonable return on its capital investments. Variability in earnings results from operating and maintenance expenditures, as well as changes in rates and the

demand for services, which are dependent on weather, changes in commodity prices and the economy.

In October 2008, East Ohio implemented a rate case settlement which began a transition to a straight-fixed-variable rate design. Under this rate design, East Ohio recovers a larger portion of its fixed operating costs through a flat monthly charge accompanied by a reduced volumetric base delivery rate. Accordingly, East Ohio’s revenue is less impacted by weather-related fluctuations in natural gas consumption than under the traditional rate design.

Revenue from Dominion’s gas transportation, gas storage and LNG storage and regasification services are largely based on firm, fee-based contractual arrangements.

Earnings from Dominion Energy’s nonregulated business, producer services, are subject to variability associated with changes in commodity prices. Producer services uses physical and financial arrangements to hedge this price risk.

### COMPETITION

Dominion Energy’s gas transmission operations compete with domestic and Canadian pipeline companies. Dominion also competes with gas marketers seeking to provide or arrange transportation, storage and other services. Alternative energy sources, such as oil or coal, provide another level of competition. Although competition is based primarily on price, the array of services that can be provided to customers is also an important factor. The combination of capacity rights held on certain long-line pipelines, a large storage capability and the availability of numerous receipt and delivery points along its own pipeline system enable Dominion to tailor its services to meet the needs of individual customers.

Retail competition for gas supply exists to varying degrees in the two states in which Dominion’s gas distribution subsidiaries operate. In Ohio, there has been no legislation enacted to require supplier choice for residential and commercial natural gas consumers. However, Dominion has offered an Energy Choice program to customers, in cooperation with the Ohio Commission. West Virginia does not require customer choice in its retail natural gas markets at this time. See *Regulation—State Regulations—Gas* for additional information.

### REGULATION

Dominion Energy’s natural gas transmission pipeline, storage and LNG operations are regulated primarily by FERC. Dominion Energy’s gas distribution service, including the rates that it may charge customers, is regulated by the Ohio and West Virginia Commissions. See *State Regulations* and *Federal Regulations* in *Regulation* for more information.

### PROPERTIES

Dominion Energy’s gas distribution network is located in the states of Ohio and West Virginia. This network involves approximately 21,800 miles of pipe, exclusive of service lines of two inches in diameter or less. The rights-of-way grants for many natural gas pipelines have been obtained from the actual owner of real estate, as underlying titles have been examined. Where rights-of-way have not been obtained, they could be acquired from private owners by condemnation, if necessary. Many natural gas pipelines are on publicly-owned property, where company rights and actions are determined on a case-by-case basis, with results that range from reimbursed relocation to revocation of permission to operate.

Dominion Energy has approximately 11,000 miles of gas transmission, gathering and storage pipelines located in the states of Maryland, New York, Ohio, Pennsylvania, Virginia and West Virginia. Dominion Energy operates 20 underground gas storage fields located in New York, Ohio, Pennsylvania and West Virginia, with almost 2,000 storage wells and approximately 262,000 acres of operated leaseholds.

The total designed capacity of the underground storage fields operated by Dominion Energy is approximately 947 bcf. Certain storage fields are jointly-owned and operated by Dominion Energy. The capacity of those fields owned by Dominion’s partners totals about 242 bcf. Dominion Energy also has about 15 bcf of above-ground storage capacity at Cove Point. Dominion Energy has about 123 compressor stations with more than 768,000 installed compressor horsepower.

In July 2008, East Ohio launched the PIR program to replace approximately 20% of its 21,000-mile pipeline system. The project, which is anticipated to cost approximately $2.6 billion, primarily involves the replacement of East Ohio’s bare steel, cast iron, wrought iron and copper pipe over a 25-year period. As part of this program, East Ohio will assume ownership of curb-to-meter service lines and will be responsible for line repairs or replacement. In October 2008, the Ohio Commission approved cost recovery for an initial five-year period of the PIR program.

In 2006, FERC approved the proposed expansion of Dominion’s Cove Point terminal and DTI pipeline and the commencement of construction of the project. The expansion project included the installation of two new LNG storage tanks at Dominion’s Cove Point terminal, each capable of storing 160,000 cubic meters of LNG, pumps, gas-turbine generators, and vaporization capacity to increase the terminal send-out by 800,000 dekatherms per day. Dominion installed 48 miles of 36-inch pipeline to increase the terminal take-away capacity to approximately 1,800,000 dekatherms per day. In addition, Dominion’s DTI gas pipeline and storage system was expanded by building approximately 120 miles of pipeline, two new compressor stations in Pennsylvania and upgrades to other compressor stations in West Virginia and New York. The DTI facilities associated with the Cove Point expansion project were placed into service in December 2008, the Cove Point LNG terminal expansion was placed into service in January 2009 and the remainder of the expanded Cove Point facilities were placed into commercial service in March 2009.

In March 2010, Dominion commenced construction of the Cove Point Pier Reinforcement Project. The $50 million project is intended to upgrade, expand and modify the existing pier at the Cove Point terminal to accommodate the next generation of LNG vessels (up to 267,000 cubic meters) that are much larger than what can currently be accommodated (no larger than 148,000 cubic meters). The project commenced with the south berth being taken temporarily out of service to accommodate construction activities. In October 2010, Dominion requested and received FERC authorization to re-commence service from the south berth of the pier for vessels with cargo capacities of no greater than 148,000 cubic meters. When the south berth was returned to service, construction commenced on the north berth, which was taken out of service. In December 2010, Dominion

requested and received authorization to place the project in service on January 21, 2011.

DTI has announced the Gathering Enhancement Project, a $253 million expansion of its natural gas gathering, processing and liquids facilities in West Virginia. The project is designed to increase the efficiency and reduce high pressures in its gathering system, thus increasing the amount of natural gas local producers can move through DTI’s West Virginia system. Construction started in 2009 and is expected to be completed by the fourth quarter of 2012. The cost of the project will be paid for by rates charged to producers.

DTI has also announced the proposed development of the Keystone Connector Project, a joint venture with The Williams Companies that would transport new natural gas supplies from the Appalachian Basin to Transcontinental Gas Pipe Line Corporation’s Station 195, providing access to markets throughout the eastern U.S. DTI is currently in discussions regarding the continued development of the Keystone Connector Project. Project timing is subject to producer drilling plans in the Appalachian Basin, as well as customer demand throughout the mid-Atlantic and Northeast regions.

DTI has announced the proposed development of a gas pipeline project, known as the Appalachian Gateway Project. The project is expected to provide approximately 484,000 dekatherms per day of firm transportation services for new Appalachian gas supplies from the supply areas in the Appalachian Basin in West Virginia and southwestern Pennsylvania to an interconnection with Texas Eastern Transmission, LP at Oakford, Pennsylvania. Plans call for construction to start in 2011, with transportation services to begin by September 2012. An open season concluded in September 2008 and the project is fully subscribed under long-term binding agreements. In June 2010, DTI filed a certificate application with the FERC seeking approval for the Appalachian Gateway project. DTI estimates the cost of the Appalachian Gateway project to be approximately $634 million.

In June 2010, DTI entered into a 15-year firm transportation agreement with the gas subsidiary of CONSOL. The project, known as the Northeast Expansion Project, is expected to provide approximately 200,000 dekatherms per day of firm transportation services for CONSOL’s Marcellus Shale natural gas production from various receipt points in central and southwestern Pennsylvania to a nexus of market pipelines and storage facilities in Leidy, Pennsylvania. The $97 million project will involve the construction by DTI of new compression facilities at three existing compressor stations in central Pennsylvania, subject to the receipt of regulatory approval. In November 2010, DTI filed a certificate application with FERC seeking approval for the Northeast Expansion Project. If the project is approved, construction is expected to begin in March 2012, with a projected in-service date of November 2012.

In August 2010, DTI entered into a 10-year lease agreement with TGP for firm capacity to move Marcellus shale natural gas supplies from TGP’s 300 Line pipeline system in northern Pennsylvania to its 200 Line pipeline system in upstate New York. The $46 million project, known as the Ellisburg-to-Craigs Project, is expected to have capacity of approximately 150,000 dekatherms per day. Subject to the receipt of regulatory approvals, the project will involve the construction by DTI of additional compression facilities and a new measurement and regulating station at the

Craigs interconnect with TGP in New York. DTI filed a certificate application with FERC in November 2010. If the Ellisburg-to-Craigs Project is approved, construction is expected to begin in March 2012, with a planned in-service date of November 2012.

In January 2011, Dominion announced that DTI is developing a natural gas processing and fractionation facility near New Martinsville, West Virginia. Dominion reached an agreement with PPG Industries, Inc. to purchase 56 acres at the Natrium site where DTI plans to process natural gas and NGLs.

### SOURCES OF ENERGY SUPPLY

Dominion Energy’s natural gas supply is obtained from various sources including purchases from major and independent producers in the Mid-Continent and Gulf Coast regions, local producers in the Appalachian area and gas marketers. Dominion’s large underground natural gas storage network and the location of its pipeline system are a significant link between the country’s major interstate gas pipelines, including the Rockies Express East pipeline, and large markets in the Northeast and mid-Atlantic regions. Dominion’s pipelines are part of an interconnected gas transmission system, which provides access to supplies nationwide for local distribution companies, marketers, power generators and industrial and commercial customers.

Dominion’s underground storage facilities play an important part in balancing gas supply with consumer demand and are essential to serving the Northeast, mid-Atlantic and Midwest regions. In addition, storage capacity is an important element in the effective management of both gas supply and pipeline transmission capacity.

### SEASONALITY

Dominion Energy’s natural gas distribution business earnings vary seasonally, as a result of the impact of changes in temperature on demand by residential and commercial customers for gas to meet heating needs. Historically, the majority of these earnings have been generated during the heating season, which is generally from November to March, however implementation of the straight fixed variable rate design at East Ohio has reduced the earnings impact of weather-related fluctuations. Demand for services at Dominion’s pipeline and storage business can also be weather sensitive. Commodity prices can be impacted by seasonal weather changes, the effects of weather on operations and the economy. Dominion’s producer services business is affected by seasonal changes in the prices of commodities that it transports, stores and actively markets and trades.

### Corporate and Other

#### Corporate and Other Segment—Virginia Power

Virginia Power’s Corporate and Other segment primarily includes certain specific items attributable to its operating segments that are not included in profit measures evaluated by executive management in assessing the segments’ performance or allocating resources among the segments.

#### Corporate and Other Segment—Dominion

Dominion’s Corporate and Other segment includes its corporate, service company and other functions (including unallocated debt) and the net impact of Peoples and certain DCI operations, which

are discussed in Notes 4 and 25 to the Consolidated Financial Statements, respectively. In addition, Corporate and Other includes specific items attributable to Dominion’s operating segments that are not included in profit measures evaluated by executive management in assessing the segments’ performance or allocating resources among the segments.

### ENVIRONMENTAL STRATEGY

Dominion and Virginia Power are committed to being good environmental stewards. Their ongoing objective is to provide reliable, affordable energy for their customers while being environmentally responsible. The integrated strategy to meet this objective consists of five major elements:

Ÿ Compliance with applicable environmental laws, regulations and rules;

Ÿ Conservation and load management;

Ÿ Renewable generation development;

Ÿ Other generation development to maintain fuel diversity, including clean coal, advanced nuclear energy, and natural gas; and

Ÿ Improvements in other energy infrastructure.

See *Global Climate Change* under *Regulation—Environmental Regulations* in this item for examples of the Companies’ efforts to reduce their impact on the environment.

### Environmental Compliance

Dominion and Virginia Power remain committed to compliance with all applicable environmental laws, regulations and rules related to their operations. Additional information related to Dominion’s and Virginia Power’s environmental compliance obligations can be found in Note 23 to the Consolidated Financial Statements.

### Conservation and Load Management

Conservation plays a significant role in meeting the growing demand for electricity. The Regulation Act provides incentives for energy conservation and sets a voluntary goal to reduce electricity consumption by retail customers in 2022 by ten percent of the amount consumed in 2006 through the implementation of conservation programs. Legislation in 2009 added definitions of peak-shaving and energy efficiency programs and allowed for a margin on operating expenses and revenue reductions related to energy efficiency programs. Virginia Power’s DSM programs provide the first steps toward achieving the voluntary ten percent energy conservation goal.

Virginia Power continues to assess smart grid technologies through a demonstration designed to indicate how these technologies may enhance Virginia Power’s electric distribution system by allowing energy to be delivered more efficiently. The demonstration involves a limited deployment, within Virginia Power’s Virginia service territory, of smart meters that use digital technology to enable two-way communication between the meter and Virginia Power’s electric distribution system. Dependent upon the outcome of the demonstration and certain regulatory proceedings, Virginia Power may make a significant investment in replacing existing meters with Advanced Metering Infrastructure. The technology is intended to help customers monitor and control their energy use. It is also expected to lead to more efficient use of the power grid, which is expected to result in energy savings and lower environmental emissions.

Additionally, the conservation and load management plan includes the following DSM programs, which were approved by the Virginia Commission in March 2010:

Ÿ Residential Lighting Program—an instant, in-store discount on the purchase of qualifying compact fluorescent lights;

Ÿ Home Energy Improvement—energy audits and improvements for homes of low-income customers;

Ÿ Smart Cooling Rewards—incentives for residential customers who voluntarily enroll to allow Virginia Power to cycle their air conditioners and heat pumps during periods of peak demand;

Ÿ Commercial HVAC Upgrade Program—incentives for commercial customers to improve the energy efficiency of their heating and/or cooling units; and

Ÿ Commercial Lighting Program—incentives for commercial customers to install energy-efficient lighting.

Virginia Power has also proposed a redesigned distributed generation program which was not approved in its original form by the Virginia Commission in 2010. Virginia Power plans to seek Virginia Commission approval of the redesigned distributed generation program and several other DSM programs in 2011.

In September 2010, Virginia Power filed with the North Carolina Commission an application for approval and cost recovery of the DSM programs listed above, as well as the redesigned distributed generation program. In February 2011, the North Carolina Commission approved the five DSM programs listed above. The North Carolina Commission will make a decision regarding the appropriate rate making treatment for the programs in a separate proceeding. Virginia Power expects to launch the five DSM programs within its North Carolina service territory in the second quarter of 2011, subject to cost recovery approval by the North Carolina Commission. Virginia Power’s request for approval of the redesigned distributed generation program remains pending before the North Carolina Commission.

### Renewable Generation

Renewable energy is also an important component of a diverse and reliable energy mix. Both Virginia and North Carolina have passed legislation setting targets for renewable power. Virginia Power is committed to meeting Virginia’s goals of 12% renewable power by 2022 and 15% by 2025 and North Carolina’s RPS of 12.5% by 2021. In May 2010, the Virginia Commission approved Virginia Power’s participation in the state’s RPS program. As a participant, Virginia Power is permitted to seek recovery, through rate adjustment clauses, of costs of programs designed to meet RPS goals. Virginia Power plans to meet the respective RPS targets in Virginia and North Carolina by utilizing existing renewable facilities, as well as the Virginia City Hybrid Energy Center, which is expected to use at least 10% biomass. In addition, Virginia Power intends to purchase renewable energy certificates, as permitted by each RPS program, to meet any remaining annual requirement needs. Virginia Power continues to explore opportunities to develop new renewable facilities within its service territory, the energy attributes of which would qualify for inclusion in the RPS programs.

In June 2010, Virginia Power announced its plans to develop an integrated solar and battery storage demonstration project in

Halifax County, Virginia. The proposed facility is intended to manage, store, and optimize solar energy to regulate intermittency, enable peak shaving and increase grid reliability. In November 2010, the Virginia Tobacco Indemnification and Community Revitalization Commission approved a $5 million grant to help fund the proposed project. Other project participants are the Halifax County Industrial Development Authority, the University of Virginia and a battery storage manufacturer. Subject to approval by the Virginia Commission and final project development, the 4 MW facility is expected to be operational in 2013.

In addition, Dominion is a 50% owner of NedPower. Dominion’s share of this project produces 132 MW of renewable energy.

Dominion is also a 50% owner with BP of the first phase of Fowler Ridge, which has a generating capacity of 300 MW. Dominion has a long-term agreement with Fowler Ridge to purchase 200 MW of energy, capacity and environmental attributes from this first phase. In December 2010, Dominion reached an agreement to sell its remaining share of the development assets of the second phase of Fowler Ridge to BP.

### Other Generation Development

Virginia Power has announced a comprehensive generation growth program, referred to as *Powering Virginia*, which involves the development, financing, construction and operation of new multi-fuel, multi-technology generation capacity to meet the anticipated growth in demand in its core market of Virginia. Virginia Power expects that these investments collectively will provide the following benefits: expanded electricity production capability, increased technological and fuel diversity and a reduction in the CO2 emission intensity of its generation fleet. One component of the *Powering Virginia* program involves consideration of the extent to which Virginia Power can reduce the carbon intensity of its generation fleet by developing generation facilities with zero CO2 and low CO2 emissions, as well as economically viable facilities that can be equipped for CO2 capture and storage. There are six generally recognized GHGs including CO2, methane, nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, and perfluorocarbons. The focus is on new generation because there is no current economically viable technological solution to retro-fit existing fossil-fueled technology to capture and store GHG emissions. Given that new generation units have useful lives of up to 55 years, Virginia Power will consider CO2 and other GHG emissions when making these long-term decisions. See *Dominion Generation—Properties* for more information.

### Improvements in Other Energy Infrastructure

In December 2010, Virginia Power announced its five-year investment plan, which includes spending approximately $4 billion to upgrade or add new transmission and distribution lines, substations and other facilities to meet growing electricity demand within its service territory and maintain reliability. These enhancements are primarily aimed at meeting Virginia Power’s continued goal of providing reliable service, and are intended to address both continued population growth and increases in electricity consumption by the typical consumer. An additional benefit will be added capacity to efficiently deliver electricity from the renewable projects now being developed or to be developed in the future. See *Global Climate Change* under *Regulation—Environmental Regulations* in this item for more information.

Virginia Power is taking measures to ensure that its electrical infrastructure can support the expected demand from electric vehicles, which have significantly lower carbon intensity than conventional vehicles. Virginia Power has partnered with Ford Motor Company to help prepare Virginia for the operation of electric vehicles, in a collaboration that involves consumer outreach, educational programs and the exchange of information on vehicle charging requirements.

### REGULATION

Dominion and Virginia Power are subject to regulation by the Virginia Commission, North Carolina Commission, SEC, FERC, EPA, DOE, NRC, Army Corps of Engineers and other federal, state and local authorities.

### State Regulations

### ELECTRIC

Virginia Power’s electric utility retail service is subject to regulation by the Virginia Commission and the North Carolina Commission.

Virginia Power holds certificates of public convenience and necessity which authorize it to maintain and operate its electric facilities now in operation and to sell electricity to customers. However, Virginia Power may not construct or incur financial commitments for construction of any substantial generating facilities or large capacity transmission lines without the prior approval of various state and federal government agencies. In addition, the Virginia Commission and the North Carolina Commission regulate Virginia Power’s transactions with affiliates, transfers of certain facilities and the issuance of securities.

### Electric Regulation in Virginia

Prior to the Regulation Act, which significantly changed electricity regulation in Virginia, Virginia Power’s Virginia jurisdictional base rates were to be capped at 1999 levels until December 31, 2010, at which time Virginia was to convert to retail competition for its electric supply service. The Regulation Act ended capped rates two years early, on December 31, 2008, at which time retail competition was made available only to individual retail customers with a demand of more than 5 MW and non-residential retail customers who obtain Virginia Commission approval to aggregate their load to reach the 5 MW threshold. Individual retail customers are also permitted to purchase renewable energy from competitive suppliers if their incumbent electric utility does not offer a 100% renewable energy tariff.

The Regulation Act also authorizes stand-alone rate adjustment clauses for recovery of costs for new generation projects, FERC-approved transmission costs, environmental compliance, conservation and energy efficiency programs and renewable energy programs. The Regulation Act provides for enhanced returns on capital expenditures on specific new generation projects, including but not limited to nuclear generation, clean coal/carbon capture compatible generation and renewable generation projects. The Regulation Act also continues statutory provisions directing Virginia Power to file annual fuel cost recovery cases with the Virginia Commission.

Pursuant to the Regulation Act, the Virginia Commission entered an order in January 2009 initiating the 2009 Base Rate Review. In connection with the 2009 Base Rate Review, Virginia Power submitted base rate filings and accompanying schedules to the Virginia Commission during 2009. In February 2010, Virginia Power filed a revised Stipulation and Recommendation with the Virginia Commission, which had the support of all of the interested parties, including the Staff of the Virginia Commission. Virginia Power’s fourth quarter 2009 results included a charge of $782 million ($477 million after-tax) representing its best estimate at the time of the probable outcome of the 2009 Base Rate Review. In March 2010, the Virginia Commission issued the Virginia Settlement Approval Order that concluded the 2009 Base Rate Review and resolved open issues relating to Virginia Power’s fuel factor and Rider T. An ROE issue relating to Riders R, S, C1 and C2 was also resolved.

The Virginia Settlement Approval Order included the following provisions:

#### Credits from 2008 Revenues

Ÿ Credits to customers of $400 million from Virginia Power’s 2008 revenues to be applied against base rates and rider charges.

#### Base Rates

Ÿ No change in Virginia Power’s base rates in existence prior to September 1, 2009 until December 1, 2013 (unless emergency rate relief is warranted by statute);

Ÿ Refund increased revenues collected under the interim base rates since September 1, 2009; and

Ÿ An ROE of 11.9% (inclusive of a performance incentive of 60 basis points) for use in the Virginia Commission’s assessment in the upcoming biennial rate review of Virginia Power’s earnings.

#### FTR Credits

Ÿ Credits to customers of $129 million, inclusive of any carrying charge, relating to revenues from FTRs for the period July 1, 2007 through June 30, 2009.

#### Generation Riders R and S

Ÿ An ROE of 12.3% (inclusive of a 100 basis point statutory enhancement) for the 2010 rate year.

#### Transmission Rider T

Ÿ Waiver of recovery, effective January 1, 2011, of deferred RTO start-up and administrative costs in the amount of $197 million (including carrying charges) that were previously approved for recovery through Rider T.

#### DSM Riders C1 and C2

Ÿ An ROE of 11.3% for the 2010 rate year.

Commencing in 2011, the Virginia Commission will conduct biennial reviews of Virginia Power’s base rates, terms and conditions. In the biennial review, as in the 2009 Base Rate Review, Virginia Power’s authorized ROE can be no lower than the average of that reported by not less than a majority of comparable utilities within the Southeastern U.S., with certain limitations as described in the Regulation Act. If Virginia Power’s earnings are more than 50 basis points above the authorized level, such earnings will be shared with customers.

Virginia Power previously filed with the Virginia Commission an application for approval and cost recovery of eleven DSM programs, including one peak-shaving program and ten energy efficiency programs. Virginia Power plans to use DSM, along with its traditional and renewable supply-side resources, to meet its projected load growth over the next 15 years. The DSM programs provide the first steps toward achieving Virginia’s goal of reducing, by 2022, the electric energy consumption of Virginia Power’s retail customers by ten percent of what was consumed in 2006. In March 2010, the Virginia Commission approved the recovery of approximately $28 million for five of the DSM programs through initiation of Riders C1 and C2, effective May 1, 2010. With respect to the other six DSM programs for which approval was sought, the Virginia Commission made a finding that they were not in the public interest at that time, but allowed Virginia Power the opportunity for further evaluation of similar programs. In July 2010, Virginia Power submitted its annual update filing for Riders C1 and C2 with respect to the five approved DSM programs. The proposed revenue requirements for Riders C1 and C2 were approximately $6 million and $18 million, respectively, which together represent a decrease of approximately $5 million compared to the Riders C1 and C2 revenue requirements included in customer rates currently in effect. In February 2011, an evidentiary hearing was held by the Virginia Commission on Virginia Power’s update of Riders C1 and C2. The Virginia Commission is required to issue its order by March 30, 2011. Virginia Power plans to seek Virginia Commission approval for several DSM programs in 2011. See *Environmental Strategy* for a description of Virginia Power’s DSM programs.

In connection with the Bear Garden and Virginia City Hybrid Energy Center projects, in June 2010, Virginia Power filed annual updates for Riders R and S, respectively, with the Virginia Commission. Initially, Virginia Power proposed an approximately $86 million revenue requirement for Rider R for the April 1, 2011 to March 31, 2012 rate year. Due to the application of accelerated tax depreciation provisions in the Small Business Jobs Act of 2010, passed in September 2010, Virginia Power revised the requested revenue requirement for Rider R in November 2010 from $86 million to $78 million. The adjusted $78 million revenue requirement represents an increase of approximately $14 million over the revenue requirement associated with the Rider R customer rates currently in effect. The proposed Rider S revenue requirement, effective April 1, 2011, for the rate year ending March 31, 2012 is approximately $200 million, which represents an increase of $46 million over the revenue requirement associated with the Rider S customer rates currently in effect. The ROE included in both rider filings is 12.3%, which is consistent with the terms of the Virginia Settlement Approval Order. In July 2010, the Virginia Commission issued orders with respect to Riders R and S, which adopted a placeholder ROE of 11.3% (not including the 100 basis point statutory enhancement) for use until the ROE is determined in the context of Virginia Power’s upcoming biennial review. Evidentiary hearings were held by the Virginia Commission on Riders R and S in December and November 2010, respectively.

The Virginia Commission is required to issue its orders in these proceedings by March 30, 2011.

With respect to Virginia Power’s costs of transmission service, in June 2010, the Virginia Commission approved Virginia Power’s annual update to Rider T which was effective September 1, 2010, reflecting the revenue requirement of approximately $338 million recommended by the Virginia Commission Staff and agreed to by Virginia Power. The $338 million revenue requirement reflects an increase of approximately $118 million over the previous revenue requirement.

In April 2010, Virginia Power filed its Virginia fuel factor application with the Virginia Commission. The application requested an annual decrease in fuel expense recovery of approximately $82 million for the period July 1, 2010 through June 30, 2011. The proposed fuel factor went into effect on July 1, 2010 on an interim basis. An evidentiary hearing on Virginia Power’s application was held in September 2010, and in October 2010, the Virginia Commission issued its final order approving the reduction in Virginia Power’s fuel factor as proposed in its application.

If the Virginia Commission’s future rate decisions, including actions relating to Virginia Power’s upcoming biennial review and rate adjustment clause filings, differ materially from Virginia Power’s expectations, it could adversely affect its results of operations, financial condition and cash flows.

### North Carolina Regulation

Virginia Power’s North Carolina base rates have been subject to a five-year base rate moratorium, effective as of April 2005. Fuel rates continued to be subject to annual fuel rate adjustments, with deferred fuel accounting for over- or under-recoveries of fuel costs.

In February 2010, in preparation for the end of the five-year base rate moratorium, Virginia Power filed an application to increase its base rates and adjust its fuel rates. Virginia Power’s application included a proposal to recover proportionately more of its purchased power energy costs through fuel rates, which are adjusted annually, instead of being recovered in base rates. In August 2010, Virginia Power filed its annual application for a change in its fuel rates, which updated the fuel application of February 2010 to reflect a proposed decrease of approximately $28 million when compared to current fuel rates. Also in August 2010, Virginia Power updated its base rate application to seek a $27 million increase, instead of $29 million as originally proposed.

In September 2010, all parties to the base rate and fuel case except one, which did not oppose the settlement, filed an Agreement and Stipulation of Settlement and requested approval from the North Carolina Commission. In December 2010, the North Carolina Commission issued the North Carolina Settlement Approval Order. The North Carolina Settlement Approval Order authorizes an increase in base revenues of approximately $8 million and a one-year decrease in combined fuel revenues of approximately $32 million when compared to revenues produced from current rates. In addition, the North Carolina Settlement Approval Order permits the recovery through fuel rates of 85% of the net energy costs of power purchases from both PJM and other wholesale suppliers and from the non-utility generators subject to economic dispatch that do not provide actual cost data. The

North Carolina Settlement Approval Order authorizes an ROE of 10.7% and a capital structure composed of 49% long-term debt and 51% common equity. Virginia Power does not agree that the foregoing ROE represents its anticipated or actual cost of equity or capital structure, but accepted the resulting revenue requirement for the purpose of a global settlement of disputed issues in the proceedings. The new base and fuel rates became effective on January 1, 2011.

### GAS

Dominion’s gas distribution services are regulated by the Ohio Commission and the West Virginia Commission.

### Status of Competitive Retail Gas Services

Both of the states in which Dominion has gas distribution operations have considered legislation regarding a competitive deregulation of natural gas sales at the retail level.

*Ohio—*Ohio has not enacted legislation requiring supplier choice for residential or commercial natural gas consumers. However, in cooperation with the Ohio Commission, Dominion offers retail choice to residential and commercial customers. At December 31, 2010, approximately 1 million of Dominion’s 1.2 million Ohio customers were participating in this Energy Choice program. In October 2006, East Ohio implemented a pilot program approved by the Ohio Commission as a transitional step towards the improvement and expansion of the Energy Choice program. Under the pilot program, East Ohio entered into gas purchase contracts with selected suppliers at a fixed price above the NYMEX month-end settlement. This Standard Service Offer pricing mechanism replaced the traditional gas cost recovery rate with a monthly market price that eliminated the true-up adjustment, making it easier for customers to compare and switch to competitive suppliers if they so choose.

In June 2008, the Ohio Commission approved a settlement filed in response to East Ohio’s application seeking approval of Phase 2 of its plan to restructure its commodity service. Under that settlement, the existing Standard Service Offer program was continued through March 2009 with an update to the fixed rate adder to the NYMEX price. Starting in April 2009, East Ohio buys natural gas under the Standard Service Offer program for customers not eligible to participate in the Energy Choice program and places Energy Choice-eligible customers in a direct retail relationship with selected suppliers, which is designated on the customers’ bills. Subject to the Ohio Commission’s approval, East Ohio may eventually exit the gas merchant function in Ohio entirely and have all customers select an alternate gas supplier. East Ohio continues to be the provider of last resort in the event of default by a supplier. Large industrial customers in Ohio also source their own natural gas supplies.

*West Virginia—*At this time, West Virginia has not enacted legislation to require customer choice in the retail natural gas markets served by Hope. However, the West Virginia Commission has issued regulations to govern pooling services, one of the tools that natural gas suppliers may utilize to provide retail customer choice in the future and has issued rules requiring competitive gas service providers to be licensed in West Virginia.

### Rates

Dominion’s gas distribution subsidiaries are subject to regulation of rates and other aspects of their businesses by the states in which

they operate—Ohio and West Virginia. When necessary, Dominion’s gas distribution subsidiaries seek general base rate increases to recover increased operating costs. In addition to general rate increases, Dominion’s gas distribution subsidiaries make routine separate filings with their respective state regulatory commissions to reflect changes in the costs of purchased gas. The majority of these purchased gas costs are subject to rate recovery through a mechanism that ensures dollar for dollar recovery of prudently incurred costs. Costs that are expected to be recovered in future rates are deferred as regulatory assets. The purchased gas cost recovery filings generally cover prospective one-, three- or twelve-month periods. Approved increases or decreases in gas cost recovery rates result in increases or decreases in revenues with corresponding increases or decreases in net purchased gas cost expenses.

In the fourth quarter of 2008, the Ohio Commission approved an approximately $41 million annual base rate revenue increase and an 8.49% allowed rate of return on rate base for East Ohio, which were reflected in revised base rates commencing December 22, 2008.

In October 2008, the Ohio Commission approved cost recovery for an initial five-year period of East Ohio’s 25-year PIR program to replace approximately 20% of its 21,000-mile pipeline system. In August 2009, East Ohio filed an application with the Ohio Commission seeking approval of the first annual adjustment to the PIR cost recovery charge approved as part of East Ohio’s 2008 base rate case. The application included a revenue requirement of approximately $16 million, which was subsequently reduced to approximately $13 million by an order issued by the Ohio Commission in December 2009. East Ohio opposed the order, however, its application for rehearing of the decision was denied. In March 2010, East Ohio filed a notice of appeal with the Supreme Court of Ohio alleging that the Ohio Commission’s order in the matter was unlawful, unjust and unreasonable. Dominion cannot predict the outcome of the appeal, however, it is not expected to have a material effect on results of operations.

In August 2010, East Ohio filed its second annual application to adjust the cost recovery charge associated with its PIR program for actual costs and a return on investments made through June 30, 2010. The application reflected a revenue requirement of approximately $28 million. In November 2010, the Ohio Commission approved a settlement agreement filed by East Ohio and the Staff of the Ohio Commission reflecting a revenue requirement of approximately $27 million. Other interested parties to the case neither supported nor objected to the settlement agreement.

Under the Ohio PIPP program, eligible customers can receive energy assistance based on their ability to pay their bill. The difference between the customer’s total bill and the PIPP plan payment amount is deferred and collected under the PIPP rider in accordance with the rules of the Ohio Commission. Due to increased participation in the program and increases in gas costs in the period since the previous rider rate went into effect, unrecovered costs increased. Accordingly, in March 2010, the Ohio Commission approved a 12-month recovery of approximately $259 million of uncollected receivables associated with the PIPP program, comprised of accumulated PIPP arrearages of $163 million and projected arrearages of $96 million for the 12 months that the PIPP rider rate will be in effect. The PIPP rider rate went into effect in April 2010. The Ohio Commission directed East Ohio to file an application, with arrearages calculated on a calendar year basis, to update its PIPP rider within one year of implementation of the new PIPP rider rate and annually thereafter.

In November 2010, rule changes adopted by the Ohio Commission to the PIPP program became effective. The rule changes established a new program, PIPP Plus, which replaced PIPP. The PIPP Plus program reduces the customer’s monthly payments from 10% to 6% of household income and provides for forgiveness credits to the customer’s balance when required payments are received in full by the due date. Such credits may result in the elimination of the customer’s arrearage balance over 24 months.

East Ohio files an annual UEX Rider with the Ohio Commission, pursuant to which it seeks recovery of the bad debt expense of most customers not participating in PIPP Plus. The UEX Rider is adjusted annually to achieve dollar-for-dollar recovery of East Ohio’s actual write-offs of uncollectable amounts. In 2010, East Ohio deferred approximately $55 million of bad debt expense for recovery through the UEX Rider.

In October 2008, Hope filed a request with the West Virginia Commission for an increase in the base rates it charges for natural gas service. The requested new base rates would have increased Hope’s revenues by approximately $34 million annually. In November 2009, the West Virginia Commission authorized an approximately $9 million increase in base rates. In June 2010, the West Virginia Commission authorized an additional base rate increase of less than $1 million to correct a miscalculation of rates attached to the November 2009 order.

### Federal Regulations

### FEDERAL ENERGY REGULATORY COMMISSION

### Electric

Under the Federal Power Act, FERC regulates wholesale sales and transmission of electricity in interstate commerce by public utilities. Virginia Power purchases and sells electricity in the PJM wholesale market and Dominion’s merchant generators sell electricity in the PJM, MISO and ISO-NE wholesale markets under Dominion’s market-based sales tariffs authorized by FERC. In addition, Virginia Power has FERC approval of a tariff to sell wholesale power at capped rates based on its embedded cost of generation. This cost-based sales tariff could be used to sell to loads within or outside Virginia Power’s service territory. Any such sales would be voluntary.

In May 2005, FERC issued an order finding that PJM’s existing transmission service rate design may not be just and reasonable, and ordered an investigation and hearings on the matter. In January 2008, FERC affirmed an earlier decision that the PJM transmission rate design for existing facilities had not become unjust and unreasonable. For recovery of costs of investments of new PJM-planned transmission facilities that operate at or above 500 kV, FERC established a regional rate design where all customers pay a uniform rate based on the costs of such investment. For recovery of costs of investment in new PJM-planned transmission facilities that operate below 500 kV, FERC affirmed its earlier decision to allocate costs on a beneficiary pays approach. A notice of appeal of this decision was filed in February 2008 at the U.S. Court of Appeals for the Seventh Circuit. In August

2009, the court denied the petition for review concerning the rate design for existing facilities, but granted the petition concerning the rate design for new facilities that operate at or above 500 kV, and remanded the issue of existing facilities back to FERC for further proceedings. Although Dominion and Virginia Power cannot predict the outcome of the FERC proceedings on remand, the impact of any PJM rate design changes on the Companies’ results of operations is not expected to be material.

Dominion and Virginia Power are subject to FERC’s Standards of Conduct that govern conduct between transmission function employees of interstate gas and electricity transmission providers and the marketing function employees of their affiliates. The rule defines the scope of transmission and marketing-related functions that are covered by the standards and is designed to prevent transmission providers from giving their affiliates undue preferences.

Dominion and Virginia Power are also subject to FERC’s affiliate restrictions that (1) prohibit power sales between Virginia Power and Dominion’s merchant plants without first receiving FERC authorization, (2) require the merchant plants and Virginia Power to conduct their wholesale power sales operations separately, and (3) prohibit Virginia Power from sharing market information with merchant plant operating personnel. The rules are designed to prohibit Virginia Power from giving the merchant plants a competitive advantage.

In April 2008, FERC granted an application for Virginia Power’s electric transmission operations to establish a forward-looking formula rate mechanism that updates transmission rates on an annual basis and approved an ROE of 11.4%, effective as of January 1, 2008. The formula rate is designed to recover the expected revenue requirement for each calendar year and is updated based on actual costs. The FERC-approved formula method, which is based on projected costs, allows Virginia Power to earn a current return on its growing investment in electric transmission infrastructure.

In July 2008, Virginia Power filed an application with FERC requesting a revision to its revenue requirement to reflect an additional ROE incentive adder for eleven electric transmission enhancement projects. Under the proposal, the cost of transmission service would increase to include an ROE incentive adder for each of the eleven projects, beginning the date each project enters commercial operation (but not before January 1, 2009). Virginia Power proposed an incentive of 1.5% for four of the projects (including the Meadow Brook-to-Loudoun line and Carson-to-Suffolk line) and an incentive of 1.25% for the other seven projects. In August 2008, FERC approved the proposal, effective September 1, 2008. The total cost for all eleven projects is estimated at $877 million, and all projects are currently expected to be completed by 2012. Numerous parties sought rehearing of the FERC order in August 2008 and rehearing is pending. Although Virginia Power cannot predict the outcome of the rehearing, it is not expected to have a material effect on results of operations.

In March 2010, ODEC and NCEMC filed a complaint with FERC against Virginia Power claiming that approximately $223 million in transmission costs related to specific projects were unjust, unreasonable and unduly discriminatory or preferential and should be excluded from Virginia Power’s transmission formula rate. ODEC and NCEMC requested that FERC estab- lish procedures to determine the amount of costs for each applicable project that should be excluded from Virginia Power’s rates. In October 2010, FERC issued an order dismissing the complaint in part and established hearings and settlement procedures on the remaining part of the complaint. While Virginia Power cannot predict the outcome of this proceeding, it is not expected to have a material effect on results of operations.

In May 2008, the RPM Buyers filed a complaint with FERC claiming that PJM’s Reliability Pricing Model’s transitional auctions have produced unjust and unreasonable capacity prices. The RPM Buyers requested that a refund effective date of June 1, 2008 be established and that FERC provide appropriate relief from unjust and unreasonable capacity charges within 15 months. In September 2008, FERC dismissed the complaint. The RPM Buyers requested rehearing of the FERC order in October 2008 and rehearing was denied in June 2009. A notice of appeal was filed in August 2009 by the Maryland Public Service Commission and the New Jersey Board of Public Utilities at the U.S. Court of Appeals for the Fourth Circuit. In November 2009, the Court transferred the appeal to the Court of Appeals for the District of Columbia Circuit. In February 2011, the Court of Appeals denied the petition for review, concluding that FERC had adequately explained why the rates were just and reasonable.

EPACT included provisions to create an ERO. The ERO is required to promulgate mandatory reliability standards governing the operation of the bulk power system in the U.S. FERC has certified NERC as the ERO and also issued an initial order approving many reliability standards that went into effect in 2007. Entities that violate standards will be subject to fines of between $1 thousand and $1 million per day, and can also be assessed non-monetary penalties, depending upon the nature and severity of the violation.

Dominion and Virginia Power plan and operate their facilities in compliance with approved NERC reliability requirements. Dominion and Virginia Power employees participate on various NERC committees, track the development and implementation of standards, and maintain proper compliance registration with NERC’s regional organizations. Dominion and Virginia Power anticipate incurring additional compliance expenditures over the next several years as a result of the implementation of new cyber security programs as well as efforts to ensure appropriate facility ratings for Virginia Power’s transmission lines. In October 2010, NERC issued an industry alert identifying possible discrepancies between the design and actual field conditions of transmission facilities as a potential reliability issue. The alert recommends that entities review their current facilities rating methodology to verify that the methodology is based on actual field conditions, rather than solely on design documents, and to take corrective action if necessary. Virginia Power is evaluating its transmission facilities for any discrepancies between design and actual field conditions. In addition, NERC has requested the industry to increase the number of assets subject to NERC reliability standards that are designated as critical assets, including cyber security assets. While Dominion and Virginia Power expect to incur additional compliance costs in connection with the above NERC requirements and initiatives, such expenses are not expected to significantly affect results of operations.

### Gas

FERC regulates the transportation and sale for resale of natural gas in interstate commerce under the Natural Gas Act of 1938 and the Natural Gas Policy Act of 1978, as amended. Under the Natural Gas Act, FERC has authority over rates, terms and conditions of services performed by Dominion’s interstate natural gas company subsidiaries, including DTI, Cove Point and the Dominion South Pipeline Company, LP. FERC also has jurisdiction over siting, construction and operation of natural gas import facilities and interstate natural gas pipeline facilities.

Dominion’s interstate gas transmission and storage activities are generally conducted on an open access basis, in accordance with certificates, tariffs and service agreements on file with FERC.

Dominion is also subject to the Pipeline Safety Act of 2002, which mandates inspections of interstate and intrastate natural gas transmission and storage pipelines, particularly those located in areas of high-density population. Dominion has evaluated its natural gas transmission and storage properties, as required by the Department of Transportation regulations under this Act, and has implemented a program of identification, testing and potential remediation activities. These activities are ongoing.

In May 2005, FERC approved a comprehensive rate settlement with DTI, its customers and interested state commissions. The settlement, which became effective July 1, 2005, revised DTI’s natural gas transmission rates and reduced fuel retention levels for storage service customers. As part of the settlement, DTI and all signatory parties agreed to a rate moratorium through June 30, 2010. DTI remains subject to the terms of the tariff rates established pursuant to the settlement.

In December 2007, DTI and the IOGA entered into a settlement agreement on DTI’s gathering and processing rates, which DTI and IOGA agreed in May 2010 to extend through December 31, 2014. DTI, at its option, may elect to extend the agreement for an additional year through December 31, 2015. The settlement extension maintains the gas retainage fee structure that DTI has had since 2001. The rates are 10.5% for gathering and 0.5% for processing. Under the settlement, DTI continues to retain all revenues from its liquids sales, thus maintaining cash flow from the liquids business. DTI will file the negotiated rates associated with the agreement extension with FERC in December 2011.

Dominion is required to file a general base rate review for the FERC-jurisdictional services of Cove Point, effective no later than July 1, 2011. At that time, Cove Point’s cost of service will be reviewed by the FERC, with rates set based on analyses of Cove Point’s costs and capital structure.

### Environmental Regulations

Each of Dominion’s and Virginia Power’s operating segments faces substantial laws, regulations and compliance costs with respect to environmental matters. In addition to imposing continuing compliance obligations, these laws and regulations authorize the imposition of substantial penalties for noncompliance, including fines, injunctive relief and other sanctions. If expenditures for pollution control technologies and associated operating costs are not recoverable from customers through regulated rates (in regulated jurisdictions) or market prices (in deregulated jurisdictions), those costs could adversely affect future results of operations and cash flows. The cost of complying with appli- cable environmental laws, regulations and rules is expected to be material to the Companies. Dominion and Virginia Power have applied for or obtained the necessary environmental permits for the operation of their facilities. Many of these permits are subject to reissuance and continuing review. For a discussion of significant aspects of these matters, including current and planned capital expenditures relating to environmental compliance required to be discussed in this Item, see *Environmental Matters* in *Future Issues and Other Matters* in MD&A, which information is incorporated herein by reference. Additional information can also be found in Item 3. Legal Proceedings and Note 23 to the Consolidated Financial Statements.

### GLOBAL CLIMATE CHANGE

### General

In recent years there has been increased national and international attention to GHG emissions and their relationship to climate change, which has resulted in federal, regional and state legislative or regulatory action in this area. Dominion and Virginia Power support national climate change legislation to provide a consistent, economy-wide approach to addressing this issue and are taking action to protect the environment and address climate change while meeting the future needs of their growing service territory. Dominion’s CEO and operating segment CEOs are responsible for compliance with the laws and regulations governing environmental matters, including climate change, and Dominion’s Board of Directors receives periodic updates on these matters.

Dominion has developed a comprehensive GHG inventory for calendar year 2009. For Dominion Generation, Dominion’s and Virginia Power’s direct CO2 equivalent emissions, based on equity share (ownership), were approximately 54 million metric tonnes and 33 million metric tonnes, respectively, in 2009. For the DVP operating segment’s electric transmission and distribution operations, direct CO2 equivalent emissions were approximately 0.2 million metric tonnes. DTI’s (including Cove Point) direct CO2 equivalent emissions were approximately 2.5 million metric tonnes and East Ohio’s direct CO2 equivalent emissions were approximately 1.4 million metric tonnes. While the Companies do not have final 2010 emissions data, they do not expect a significant variance in emissions from 2009 amounts. With respect to electric generation, primary facility stack emissions of CO2 from carbon based fuel combustion are directly measured via continuous emissions monitor system methods set forth under 40 CFR Part 75 of the U.S. Electric Code of Federal Regulation. For those emission sources not covered under 40 CFR Part 75, and for methane and nitrous oxide emissions, quantification is based on fuel combustion, higher heating values, emission factors, and global warming potentials as specified in the EPA’s Mandatory Reporting of Greenhouse Gases Rule. For the DVP operating segment’s electric transmission and distribution emissions, the protocol used was *The Climate Registry*. For Dominion’s natural gas businesses, combustion related emissions were calculated using the EPA Mandatory Reporting of Greenhouse Gases Rule as described above. For DTI, the protocol used to calculate the non-combustion related emissions reported above was *Greenhouse Gas Emission Estimation Guidelines for Natural Gas Transmission and Storage, Volume 1-GHG Estimation Methodologies and Procedures-Revision 2, September 28, 2005* developed by the Interstate Natural Gas Association of America.

For East Ohio, the protocol used to calculate the non-combustion related emissions was the American Gas Association’s April 2008 Greenhouse Emissions Estimation Methodologies and Procedures for Natural Gas Distribution Operations.

### Climate Change Legislation and Regulation

See Note 23 to the Consolidated Financial Statements for information on climate change legislation and regulation.

### Dominion and Virginia Power’s Strategy for Voluntarily Reducing GHG Emissions

While Dominion and Virginia Power have not established a standalone GHG emissions reduction target or timetable, they are actively engaged in voluntary reduction efforts and are working toward achieving the standards established by existing state regulations as set forth above. The Companies have an integrated strategy for reducing GHG emission intensity that is based on maintaining a diverse fuel mix, including nuclear, coal, gas, hydro and renewable energy, investing in renewable energy projects and promoting energy conservation and efficiency efforts. See *Environmental Strategy* above for a description of Dominion and Virginia Power’s strategy for reducing GHG emission intensity. Below are some of the Companies’ efforts that have or are expected to reduce the Companies’ carbon emissions or intensity:

Ÿ In 2003, Virginia Power retired two oil-fired units at its Possum Point power station, replacing them with a new 559 MW combined-cycle natural gas unit. Virginia Power also converted two coal-fired units to cleaner burning natural gas.

Ÿ Since 2000, Dominion has added over 2,600 MW of non-emitting nuclear generation and over 3,500 MW of new lower-emitting natural gas-fired generation including nearly 1,600 MW at Virginia Power (excluding Possum Point), to its generation mix.

Ÿ Virginia Power added 83 MW of renewable biomass.

Ÿ Dominion has over 800 MW of wind energy in operation or development.

Ÿ In June 2010, Virginia Power announced its plans to develop an integrated solar and battery storage demonstration project in Halifax County, Virginia.

Ÿ Virginia Power is completing construction of the 580 MW combined-cycle natural gas-fired Bear Garden generating facility.

Ÿ Virginia Power has announced its plans to develop the Warren County power station development project, which is designed to be a 3-on-1, combined-cycle, natural gas-fired power station expected to generate more than 1,300 MW of electricity. In connection with the air permit process for the Warren County project, Virginia Power reached an agreement with the National Park Service to permanently retire the North Branch power station, a 74 MW coal fired plant located in West Virginia, once the Warren County power station begins commercial operations.

Ÿ Virginia Power and ODEC have received an Early Site Permit from the NRC for the possible addition of approximately 1,500 MW of nuclear generation in Virginia. Virginia Power has not yet committed to building a new nuclear unit.

Ÿ In May 2010, Virginia Power launched five new DSM programs within the Virginia service territory and has sought the approval of the North Carolina commission to launch six new

DSM programs in North Carolina in 2011, subject to required regulatory approvals.

Ÿ Virginia Power has initiated a demonstration of smart grid technologies, which are designed to help reduce the electric energy consumption of Virginia Power’s retail customers and therefore reduce generation requirements.

While, upon entering service, Virginia Power’s new Virginia City Hybrid Energy Center, which is currently under construction in southwest Virginia, will be a new source of GHG emissions, Virginia Power has taken steps to minimize the impact on the environment. The new plant is expected to use at least 10% biomass for fuel and is designed to be carbon-capture compatible, meaning that technology to capture CO2 can be added to the station when it becomes commercially available. Also, Virginia Power has announced plans to convert its coal units at Bremo power station to natural gas, contingent upon the Virginia City Hybrid Energy Center entering service and receipt of necessary approvals. It is currently estimated that the Virginia City Hybrid Energy Center will have the potential to emit about 4.8 million metric tonnes of direct CO2 emissions in a year assuming a 100% capacity factor and 100% coal-fired operation. Actual emissions will depend on the capacity factor of the facility and the extent to which biomass is burned. See *Dominion Generation—Properties* for more information on the projects above, as well as other projects under current development.

Since 2000, the Companies have tracked the emissions of their electric generation fleet. Their electric generation fleet employs a mix of fuel and renewable energy sources. Comparing annual year 2000 to annual year 2009, Dominion and Virginia Power’s electric generating fleet (based on ownership percentage) reduced their average CO2 emissions rate per MWh of energy produced from electric generation by about 16% and 5%, respectively. During such time period the capacity of Dominion and Virginia Power’s electric generation fleet has grown.

### Nuclear Regulatory Commission

All aspects of the operation and maintenance of Dominion’s and Virginia Powers’ nuclear power stations, which are part of the Dominion Generation segment, are regulated by the NRC. Operating licenses issued by the NRC are subject to revocation, suspension or modification, and the operation of a nuclear unit may be suspended if the NRC determines that the public interest, health or safety so requires.

From time to time, the NRC adopts new requirements for the operation and maintenance of nuclear facilities. In many cases, these new regulations require changes in the design, operation and maintenance of existing nuclear facilities. If the NRC adopts such requirements in the future, it could result in substantial increases in the cost of operating and maintaining Dominion’s and Virginia Power’s nuclear generating units.

The NRC also requires Dominion and Virginia Power to decontaminate their nuclear facilities once operations cease. This process is referred to as decommissioning, and the Companies are required by the NRC to be financially prepared. For information on decommissioning trusts, see *Dominion Generation—Nuclear Decommissioning* and Note 10 to the Consolidated Financial Statements.

### SPENT NUCLEAR FUEL

Under provisions of the Nuclear Waste Policy Act of 1982, Dominion and Virginia Power entered into contracts with the DOE for the disposal of spent nuclear fuel. The DOE failed to begin accepting the spent fuel on January 31, 1998, the date provided by the Nuclear Waste Policy Act and by the Companies’ contracts with the DOE. In January 2004, Dominion and Virginia Power filed lawsuits in the U.S. Court of Federal Claims against the DOE requesting damages in connection with its failure to commence accepting spent nuclear fuel. A trial occurred in May 2008 and post-trial briefing and argument concluded in July 2008. On October 15, 2008, the Court issued an opinion and order for Dominion in the amount of approximately $155 million, which includes approximately $112 million in damages incurred by Virginia Power for spent fuel-related costs at its Surry and North Anna power stations and approximately $43 million in damages incurred for spent nuclear fuel-related costs at Millstone through June 30, 2006. Judgment was entered by the Court on October 28, 2008. In December 2008, the government appealed the judgment to the U. S. Court of Appeals for the Federal Circuit and the appeal was docketed. In March 2009, the Federal Circuit granted the government’s request to stay the appeal. In May 2010, the stay was lifted, and the government’s initial brief in the appeal was filed in June 2010. The issues raised by the government on appeal pertain to the damages awarded to Dominion for Millstone. The government did not take issue with the damages awarded to Virginia Power for Surry or North Anna. As a result, Virginia Power recognized a receivable in the amount of $174 million, largely offset against property, plant and equipment and regulatory assets and liabilities, representing certain spent nuclear fuel-related costs incurred through June 30, 2010. Briefing on the appeal was concluded in September 2010 and oral argument took place before the Federal Circuit in January 2011. Payment of any damages will not occur until the appeal process has been resolved.

A lawsuit was also filed for Kewaunee. In August 2010, Dominion and the federal government reached a settlement resolving Dominion’s claims for damages incurred at Kewaunee through December 31, 2008. The approximately $21 million settlement payment was received in September 2010.

The Companies will continue to manage their spent fuel until it is accepted by the DOE.

Virginia Power and Kewaunee continue to recognize receivables for certain spent nuclear fuel-related costs that they believe are probable of recovery from the DOE.

## Risk factors

As filed, 28,889 characters.

Dominion’s and Virginia Power’s businesses are influenced by many factors that are difficult to predict, involve uncertainties that may materially affect actual results and are often beyond their control. A number of these factors have been identified below. For other factors that may cause actual results to differ materially from those indicated in any forward-looking statement or projection contained in this report, see *Forward-Looking Statements* in Item 7. MD&A.

**Dominion’s and Virginia Power’s results of operations can be affected by changes in the weather.** Weather conditions directly influence the demand for electricity and natural gas, and affect the price of energy commodities. In addition, severe weather, including hurricanes and winter storms, can be destructive, causing outages and property damage that require incurring additional expenses. Additionally, droughts can result in reduced water levels that could adversely affect operations at some of the Companies’ power stations. Furthermore, the Companies’ operations could be adversely affected and their physical plant placed at greater risk of damage should changes in global climate produce, among other possible conditions, unusual variations in temperature and weather patterns, resulting in more intense, frequent and extreme weather events, abnormal levels of precipitation and, for operations located on or near coastlines, a change in sea level.

**Dominion and Virginia Power are subject to complex governmental regulation that could adversely affect their results of operations.** Dominion’s and Virginia Power’s operations are subject to extensive federal, state and local regulation and require numerous permits, approvals and certificates from various governmental agencies. They must also comply with environmental legislation and associated regulations. Management believes that the necessary approvals have been obtained for existing operations and that their business is conducted in accordance with applicable laws. However, new laws or regulations, the revision or reinterpretation of existing laws or regulations, or penalties imposed for non-compliance with existing laws or regulations may result in substantial expense.

**Dominion and Virginia Power could be subject to penalties as a result of mandatory reliability standards.** As a result of EPACT, owners and operators of generation facilities and bulk electric transmission systems, including Dominion and Virginia Power, are subject to mandatory reliability standards enacted by NERC and enforced by FERC. Compliance with the mandatory reliability standards may subject the Companies to higher operating costs and may result in increased capital expenditures. If either Dominion or Virginia Power is found not to be in compliance with the mandatory reliability standards it could be subject to remediation costs, as well as sanctions, including substantial monetary penalties.

**Dominion’s and Virginia Power’s costs of compliance with environmental laws are significant. The costs of compliance with future environmental laws, including laws and regulations designed to address global climate change, air quality, coal combustion by-products, cooling water and other matters could make certain of the Companies’ generation facilities uneconomical to maintain or operate.** Dominion’s and Virginia Power’s operations are subject to extensive federal, state and local environmental statutes, rules and regulations relating to air quality, water quality, waste management, natural resources, and health and safety. Compliance with these legal requirements requires the Companies to commit significant capital toward permitting, emission fees, environmental monitoring, installation and operation of pollution control equipment and purchase of allowances and/or offsets. Additionally, the Companies could be responsible for expenses relating to remediation and containment obligations, including at sites where they have been identified by a regulatory agency as a potentially responsible party. Expenditures relating to environmental compliance have been significant in the past, and Dominion and Virginia Power expect that they will remain significant in the future.

Existing environmental laws and regulations may be revised and/or new laws may be adopted or become applicable to Domin-

ion or Virginia Power. The EPA is expected to issue additional regulations with respect to air quality under the CAA, including revised NAAQS, a replacement of the CAIR relating to NOX and SO2 emissions, and a MACT rule for coal and oil-fired electric generation plants that will likely address numerous HAPs, including mercury. Risks relating to potential regulation of GHG emissions are discussed below. Dominion and Virginia Power also expect additional federal water and waste regulations, including regulations concerning cooling water intake structures and coal combustion by-product handling and disposal practices.

Compliance costs cannot be estimated with certainty due to the inability to predict the requirements and timing of implementation of any new environmental rules or regulations related to emissions. Other factors which affect the ability to predict future environmental expenditures with certainty include the difficulty in estimating clean-up costs and quantifying liabilities under environmental laws that impose joint and several liability on all responsible parties. However, such expenditures, if excessive, could make the Companies’ generation facilities uneconomical to operate, result in the impairment of assets, or otherwise adversely affect Dominion’s or Virginia Power’s results of operations, financial performance or liquidity.

**If additional federal and/or state requirements are imposed on energy companies mandating limitations on GHG emissions, such requirements may result in compliance costs that alone or in combination could make some of Dominion’s or Virginia Power’s electric generation units uneconomical to maintain or operate.** The U.S. Congress, environmental advocacy groups, other organizations and some state and federal agencies are focusing considerable attention on GHG emissions from power generation facilities and their potential role in climate change. Dominion and Virginia Power expect that federal legislation and/or additional EPA regulation, and possibly additional state legislation and/or regulation, may pass resulting in the imposition of additional limitations on GHG emissions from fossil fuel-fired electric generating units.

There are also potential impacts on Dominion’s natural gas businesses as federal GHG legislation and regulations may require GHG emission reductions from the natural gas sector and could affect demand for natural gas. Additionally, GHG requirements could result in increased demand for energy conservation and renewable products. Several regions of the U.S. have moved forward with GHG emission regulations including regions where Dominion has operations. For example, Massachusetts has implemented regulations requiring reductions in CO2 emissions through RGGI, a cap and trade program covering CO2 emissions from power plants in the Northeast, which affects several of Dominion’s facilities.

Compliance with GHG emission reduction requirements may require increasing the energy efficiency of equipment at facilities, committing significant capital toward carbon capture and storage technology, purchase of allowances and/or offsets, fuel switching, and/or retirement of high-emitting generation facilities and potential replacement with lower emitting generation facilities. The cost of compliance with GHG emission legislation and/or regulation is subject to significant uncertainties due to the outcome of several interrelated assumptions and variables, including timing of the implementation of rules, required levels of reductions, allocation requirements of the new rules, the maturation and commercialization of carbon capture and storage technology and associated regulations, and the selected compliance alternatives. As a result, the Companies cannot estimate the effect of any such legislation on their results of operations, financial condition or their customers. However, such expenditures, if excessive, could make the Companies’ generation facilities uneconomical to operate, result in the impairment of assets, or otherwise adversely affect Dominion’s or Virginia Power’s results of operations, financial performance or liquidity.

**The base rates and rider rates of Virginia Power are subject to regulatory review.** As a result of the Regulation Act, in 2009 the Virginia Commission commenced its review of the base rates of Virginia Power under a modified cost-of-service model. That review culminated in a final order in March 2010, in which the Commission ordered that Virginia Power’s base rates be frozen at their pre-September 1, 2009 levels until December 1, 2013. In 2011, however, the Virginia Commission will commence biennial reviews of the rates and terms and conditions of Virginia Power and, in that first biennial review, may order a credit to customers for a portion of earnings more than 50 basis points above the authorized ROE.

**The rates of Virginia Power’s electric transmission operations and Dominion’s gas transmission and distribution operations are subject to regulatory review.** Revenue provided by Virginia Power’s electric transmission operations and Dominion’s gas transmission and distribution operations is based primarily on rates approved by federal and state regulatory agencies. The profitability of these businesses is dependent on their ability, through the rates that they are permitted to charge, to recover costs and earn a reasonable rate of return on their capital investment.

Virginia Power’s wholesale charges for electric transmission service are adjusted on an annual basis through operation of a FERC-approved formula rate mechanism. Through this mechanism, Virginia Power’s wholesale electric transmission cost of service is estimated and thereafter adjusted as appropriate to reflect actual costs allocated to Virginia Power by PJM. These wholesale rates are subject to FERC review and prospective adjustment in the event that customers and/or interested state commissions file a complaint with FERC and are able to demonstrate that Virginia Power’s wholesale revenue requirement is no longer just and reasonable.

Similarly, various rates and charges assessed by Dominion’s gas transmission businesses are subject to review by FERC. Dominion is required to file a general base rate review for the FERC-jurisdictional services of Cove Point, effective no later than July 31, 2011. At that time, Cove Point’s cost-of-service will be reviewed by the FERC, with rates set based on analyses of Cove Point’s costs and capital structure.

Dominion’s gas distribution businesses are subject to state regulatory review in the jurisdictions in which they operate.

**Risks arising from the reliability of electric generation, transmission and distribution equipment could result in lost revenues and increased expenses, including higher maintenance costs.** Operation of the Companies’ generation, transmission and distribution facilities involves risk, including, the risk of potential breakdown or failure of equipment or processes, due to aging infrastructure, fuel supply or transportation disruptions, accidents, labor disputes or work stoppages by employees, acts of terrorism or sabotage, construction delays or cost overruns, shortages of or delays in obtaining equipment, material and labor, operational restrictions

resulting from environmental limitations and governmental interventions, and performance below expected levels. In addition, weather-related incidents and other natural disasters can disrupt generation, transmission and distribution facilities. Because Virginia Power’s transmission facilities are interconnected with those of third parties, the operation of its facilities could be adversely affected by unexpected or uncontrollable events occurring on the systems of such third parties.

Operation of the Companies’ generation facilities below expected capacity levels could result in lost revenues and increased expenses, including higher maintenance costs. Unplanned outages of generating units and extensions of scheduled outages due to mechanical failures or other problems occur from time to time and are an inherent risk of the Companies’ business. Unplanned outages typically increase the Companies’ operation and maintenance expenses and may reduce their revenues as a result of selling less energy or may require the Companies to incur significant costs as a result of operating higher cost units or obtaining replacement energy and capacity from third parties in the open market to satisfy forward energy and capacity obligations. Moreover, if the Companies are unable to perform their contractual obligations, penalties or liability for damages could result.

**Dominion’s merchant power business is operating in a challenging market, which could adversely affect its results of operations and future growth.**

The success of Dominion’s merchant power business depends upon favorable market conditions including the ability to purchase and sell power at prices sufficient to cover its operating costs. Dominion operates in active wholesale markets that expose it to price volatility for electricity and fuel as well as the credit risk of counterparties. Dominion attempts to manage its price risk by entering into hedging transactions, including short-term and long-term fixed price sales and purchase contracts.

In these wholesale markets, the spot market price of electricity for each hour is generally determined by the cost of supplying the next unit of electricity to the market during that hour. In many cases, the next unit of electricity supplied would be provided by generating stations that consume fossil fuels, primarily natural gas. Consequently, the open market wholesale price for electricity generally reflects the cost of natural gas plus the cost to convert the fuel to electricity. Therefore, changes in the price of natural gas generally affect the open market wholesale price of electricity. To the extent Dominion does not enter into long-term power purchase agreements or otherwise hedge its output, then these changes in market prices could adversely affect its financial results.

Dominion purchases fuel under a variety of terms, including long-term and short-term contracts and spot market purchases. Dominion is exposed to fuel cost volatility for the portion of its fuel obtained through short-term contracts or on the spot market. Fuel prices can be volatile and the price that can be obtained for power produced from such fuel may not change at the same rate as fuel costs, thus adversely impacting Dominion’s financial results.

**Dominion’s merchant power business may be negatively affected by possible FERC actions that could weaken competition in the wholesale markets or affect pricing rules in the RTO markets.** Dominion’s merchant generation stations operating in PJM, MISO and ISO-NE sell capacity, energy and ancillary services into wholesale elec- tricity markets regulated by FERC. The wholesale markets allow these merchant generation stations to take advantage of market price opportunities, but also expose them to market risk. Properly functioning competitive wholesale markets in PJM, MISO and ISO-NE depend upon FERC’s continuation of clearly identified market rules. From time to time FERC may investigate and authorize PJM, MISO and ISO-NE to make changes in market design. FERC also periodically reviews Dominion’s authority to sell at market-based rates. Material changes by FERC to the design of the wholesale markets or Dominion’s authority to sell power at market-based rates could adversely impact the future results of its merchant power business.

**War, acts and threats of terrorism, natural disaster and other significant events could adversely affect Dominion’s and Virginia Power’s operations.** We cannot predict the impact that any future terrorist attacks may have on the energy industry in general, or on our business in particular. Any retaliatory military strikes or sustained military campaign may affect our operations in unpredictable ways, such as changes in insurance markets and disruptions of fuel supplies and markets. In addition, infrastructure facilities, such as electric generation, electric and gas transmission and distribution facilities could be direct targets of, or indirect casualties of, an act of terror. Furthermore, the physical or cyber security compromise of our facilities, could adversely affect our ability to manage these facilities effectively. Instability in financial markets as a result of terrorism, war, natural disasters, pandemic, credit crises, recession or other factors could result in a significant decline in the U.S. economy, and the increased cost of insurance coverage, any of which could negatively impact the Companies’ results of operations and financial condition.

**There are risks associated with the operation of nuclear facilities.** Dominion and Virginia Power operate nuclear facilities that are subject to risks, including their ability to dispose of spent nuclear fuel, the disposal of which is subject to complex federal and state regulatory constraints. These risks also include the cost of and ability to maintain adequate reserves for decommissioning, costs of replacement power, costs of plant maintenance and exposure to potential liabilities arising out of the operation of these facilities. Decommissioning trusts and external insurance coverage are maintained to mitigate the financial exposure to these risks. However, it is possible that decommissioning costs could exceed the amount in the trusts or that costs arising from claims could exceed the amount of any insurance coverage.

**The use of derivative instruments could result in financial losses and liquidity constraints.** Dominion and Virginia Power use derivative instruments, including futures, swaps, forwards, options and FTRs, to manage commodity and financial market risks. In addition, Dominion purchases and sells commodity-based contracts primarily in the natural gas market for trading purposes. The Companies could recognize financial losses on these contracts, including as a result of volatility in the market values of the underlying commodities or if a counterparty fails to perform under a contract. In the absence of actively-quoted market prices and pricing information from external sources, the valuation of these contracts involves management’s judgment or use of estimates. As a result, changes in the underlying assumptions or use of alternative valuation methods could affect the reported fair value of these contracts.

The use of derivatives to hedge future sales may limit the benefit Dominion would otherwise receive from increases in commodity prices. These hedge arrangements generally include collateral requirements that require Dominion to deposit funds or post letters of credit with counterparties to cover the fair value of covered contracts in excess of agreed upon credit limits. For instance, when commodity prices rise to levels substantially higher than the levels where it has hedged future sales, Dominion may be required to use a material portion of its available liquidity or obtain additional liquidity to cover these collateral requirements. In some circumstances, this could have a compounding effect on Dominion’s financial liquidity and results of operations.

Derivatives designated under hedge accounting, to the extent not fully offset by the hedged transaction, can result in ineffectiveness losses. These losses primarily result from differences between the location and/or specifications of the derivative hedging instrument and the hedged item and could adversely affect Dominion’s results of operations.

Dominion’s and Virginia Power’s operations in regards to these transactions are subject to multiple market risks including market liquidity, counterparty credit strength and price volatility. These market risks are beyond the Companies’ control and could adversely affect their results of operations and future growth.

The Dodd-Frank Act, which was enacted into law in July 2010, includes provisions that will require certain over-the-counter derivatives, or swaps, to be centrally cleared and executed through an exchange or other approved trading platform. Final rules for the over-the-counter derivatives-related provisions of the Dodd-Frank Act, including the clearing, exchange trading and capital and margin requirements, will be established through the CFTC’s rulemaking process, which is required to be completed by July 2011. If, as a result of the rulemaking process, Dominion’s or Virginia Power’s derivative activities are not exempted from the clearing, exchange trading or margin requirements, the Companies could be subject to higher costs for their derivative activities, including from higher margin requirements. In addition, implementation of, and compliance with, the over-the-counter derivatives provisions of the Dodd-Frank Act by the Companies’ swap counterparties could result in increased costs related to the Companies’ derivative activities.

**Dominion and Virginia Power may not complete plant construction or expansion projects that they commence, or they may complete projects on materially different terms or timing than initially anticipated and they may not be able to achieve the intended benefits of any such project, if completed.** Several plant construction and expansion projects have been announced and additional projects may be considered in the future. Management anticipates that they will be required to seek additional financing in the future to fund current and future plant construction and expansion projects and may not be able to secure such financing on favorable terms. In addition, projects may not be able to be completed on time as a result of weather conditions, delays in obtaining or failure to obtain regulatory approvals, delays in obtaining key materials, labor difficulties, difficulties with partners or potential partners, a decline in the credit strength of their counterparties or vendors, or other factors beyond their control. Even if plant construction and expansion projects are completed, the total costs of the projects may be higher than anticipated and the performance of the business of Dominion and Virginia Power following the projects may not meet expectations. Additionally, regulators may disallow recovery of some of the costs of a project if they are deemed not to be prudently incurred. Further, Dominion and Virginia Power may not be able to timely and effectively integrate the projects into their operations and such integration may result in unforeseen operating difficulties or unanticipated costs. Any of these or other factors could adversely affect their ability to realize the anticipated benefits from the plant construction and expansion projects.

**Exposure to counterparty performance may adversely affect the Companies’ financial results of operations.** Dominion and Virginia Power are exposed to credit risks of their counterparties and the risk that one or more counterparties may fail or delay the performance of their contractual obligations, including but not limited to payment for services. Such defaults by customers, suppliers or other third parties may adversely affect the Companies’ financial results.

**Energy conservation could negatively impact Dominion’s and Virginia Power’s financial results.** Certain regulatory and legislative bodies have introduced or are considering requirements and/or incentives to reduce energy consumption by a fixed date. Additionally, technological advances driven by federal laws mandating new levels of energy efficiency in end-use electric devices, including lighting and electric heat pumps, could lead to declines in per capita energy consumption. To the extent conservation resulted in reduced energy demand or significantly slowed the growth in demand, the value of the Companies’ business activities could be adversely impacted.

**An inability to access financial markets could adversely affect the execution of Dominion’s and Virginia Power’s business plans.** Dominion and Virginia Power rely on access to short-term money markets and longer-term capital markets as significant sources of funding and liquidity for capital expenditures, normal working capital and collateral requirements related to hedges of future sales and purchases of energy-related commodities. Deterioration in the Companies’ creditworthiness, as evaluated by credit rating agencies or otherwise, or market reputation, or general financial market disruptions outside of Dominion’s and Virginia Power’s control could increase their cost of borrowing or restrict their ability to access one or more financial markets. Further market disruptions could stem from delays in the current economic recovery, the bankruptcy of an unrelated company, general market disruption due to general credit market or political events, or the failure of financial institutions on which the Companies rely. Increased costs and restrictions on the Companies’ ability to access financial markets may be severe enough to affect their ability to execute their business plans as scheduled.

**Market performance and other changes may decrease the value of decommissioning trust funds and benefit plan assets or increase Dominion’s liabilities, which then could require significant additional funding.** The performance of the capital markets affects the value of the assets that are held in trusts to satisfy future obligations to decommission Dominion’s nuclear plants and under its pension and other postretirement benefit plans. Dominion has significant obligations in these areas and holds significant assets in these trusts. These assets are subject to market fluctuation and will yield uncertain returns, which may fall below expected return rates. A decline in the market value of the assets may increase the funding requirements of the obligations to decommission Dominion’s

nuclear plants and under its pension and other postretirement benefit plans. Additionally, changes in interest rates affect the liabilities under Dominion’s pension and other postretirement benefit plans; as interest rates decrease, the liabilities increase, potentially requiring additional funding. Further, changes in demographics, including increased numbers of retirements or changes in life expectancy assumptions, may also increase the funding requirements of the obligations related to the pension and other postretirement benefit plans. If the decommissioning trust funds and benefit plan assets are negatively impacted by market fluctuations, Dominion’s results of operations and financial condition could be negatively affected.

**Changing rating agency requirements could negatively affect Dominion’s and Virginia Power’s growth and business strategy.** In order to maintain appropriate credit ratings to obtain needed credit at a reasonable cost in light of existing or future rating agency requirements, Dominion and Virginia Power may find it necessary to take steps or change their business plans in ways that may adversely affect their growth and earnings. A reduction in Dominion’s credit ratings or the credit ratings of Virginia Power could result in an increase in borrowing costs, loss of access to certain markets, or both, thus adversely affecting operating results and could require Dominion to post additional collateral in connection with some of its price risk management activities.

**Potential changes in accounting practices may adversely affect Dominion’s and Virginia Power’s financial results.** Dominion and Virginia Power cannot predict the impact that future changes in accounting standards or practices may have on public companies in general, the energy industry or their operations specifically. New accounting standards could be issued that could change the way they record revenues, expenses, assets and liabilities. These changes in accounting standards could adversely affect reported earnings or could increase reported liabilities.

**Failure to retain and attract key executive officers and other skilled professional and technical employees could have an adverse effect on Dominion’s and Virginia Power’s operations.** Dominion’s and Virginia Power’s business strategy is dependent on their ability to recruit, retain and motivate employees. Competition for skilled employees in some areas is high and the inability to retain and attract these employees could adversely affect their business and future operating results.

## Properties

As filed, 6,519 characters.

As of December 31, 2010, Dominion owned its principal executive office and three other corporate offices, all located in Richmond, Virginia. Dominion also leases corporate offices in other cities in which its subsidiaries operate. Virginia Power shares its principal office in Richmond, Virginia, which is owned by Dominion. In addition, Virginia Power’s DVP and Generation segments share certain leased buildings and equipment. See Item 1. Business for additional information about each segment’s principal properties, which information is incorporated herein by reference.

Dominion’s assets consist primarily of its investments in its subsidiaries, the principal properties of which are described here and in Item 1. Business.

Substantially all of Virginia Power’s property is subject to the lien of the Indenture of Mortgage securing its First and Refunding Mortgage Bonds. There were no bonds outstanding as of December 31, 2010; however, by leaving the indenture open,

Virginia Power retains the flexibility to issue mortgage bonds in the future. Certain of Dominion’s merchant generation facilities are also subject to liens.

### POWER GENERATION

Dominion and Virginia Power generate electricity for sale on a wholesale and a retail level. The Companies supply electricity demand either from their generation facilities or through purchased power contracts. As of December 31, 2010, Dominion Generation’s total utility and merchant generating capacity was 27,615 MW.

The following tables list Dominion Generation’s utility and merchant generating units and capability, as of December 31, 2010:

### VIRGINIA POWER UTILITY GENERATION

| Plant Coal | Location | Net Summer Capability (MW) |  | Percentage Net Summer Capability |
| --- | --- | ---: | ---: | ---: |
| Mt. Storm | Mt. Storm, WV | 1,560 |  |  |
| Chesterfield | Chester, VA | 1,242 |  |  |
| Chesapeake | Chesapeake, VA | 595 |  |  |
| Clover | Clover, VA | 433 | (1) |  |
| Yorktown | Yorktown, VA | 323 |  |  |
| Bremo | Bremo Bluff, VA | 227 |  |  |
| Mecklenburg | Clarksville, VA | 138 |  |  |
| North Branch | Bayard, WV | 74 | (2) |  |
| Altavista | Altavista, VA | 63 | (2) |  |
| Polyester | Hopewell, VA | 63 |  |  |
| Southampton | Southampton, VA | 63 |  |  |
| Total Coal |  | 4,781 |  | 26% |
| **Gas** |  |  |  |  |
| Ladysmith (CT) | Ladysmith, VA | 783 |  |  |
| Remington (CT) | Remington, VA | 608 |  |  |
| Possum Point (CC) | Dumfries, VA | 559 |  |  |
| Chesterfield (CC) | Chester, VA | 397 |  |  |
| Elizabeth River (CT) | Chesapeake, VA | 348 |  |  |
| Possum Point | Dumfries, VA | 316 |  |  |
| Bellemeade (CC) | Richmond, VA | 267 |  |  |
| Gordonsville Energy (CC) | Gordonsville, VA | 218 |  |  |
| Rosemary (CC) | Roanoke Rapids, VA | 165 |  |  |
| Gravel Neck (CT) | Surry, VA | 170 |  |  |
| Darbytown (CT) | Richmond, VA | 168 |  |  |
| Total Gas |  | 3,999 |  | 22 |
| **Nuclear** |  |  |  |  |
| Surry | Surry, VA | 1,642 |  |  |
| North Anna | Mineral, VA | 1,638 | (3) |  |
| Total Nuclear |  | 3,280 |  | 18 |
| **Oil** |  |  |  |  |
| Yorktown | Yorktown, VA | 818 |  |  |
| Possum Point | Dumfries, VA | 786 |  |  |
| Gravel Neck (CT) | Surry, VA | 198 |  |  |
| Darbytown (CT) | Richmond, VA | 168 |  |  |
| Chesapeake (CT) | Chesapeake, VA | 115 |  |  |
| Possum Point (CT) | Dumfries, VA | 72 |  |  |
| Low Moor (CT) | Covington, VA | 48 |  |  |
| Northern Neck (CT) | Lively, VA | 47 |  |  |
| Kitty Hawk (CT) | Kitty Hawk, NC | 31 |  |  |
| Total Oil |  | 2,283 |  | 12 |
| **Hydro** |  |  |  |  |
| Bath County | Warm Springs, VA | 1,802 | (4) |  |
| Gaston | Roanoke Rapids, NC | 220 |  |  |
| Roanoke Rapids | Roanoke Rapids, NC | 95 |  |  |
| Other | Various | 3 |  |  |
| Total Hydro |  | 2,120 |  | 12 |
| **Biomass** |  |  |  |  |
| Pittsylvania | Hurt, VA | 83 |  | — |
| **Various** |  |  |  |  |
| Other | Various | 11 |  | — |
|  |  | 16,557 |  |  |
| Power Purchase Agreements |  | 1,861 |  | 10 |
| Total Utility Generation |  | 18,418 |  | 100% |

### 27

#### Note: (CT) denotes combustion turbine and (CC) denotes combined cycle.

#### (1) Excludes 50% undivided interest owned by ODEC.

*(2) Facility has been placed into cold reserve status, but can be restarted within a reasonably short period if necessary. North Branch will be permanently retired upon commencement of commercial operations at the proposed Warren County power station currently under development.*

#### (3) Excludes 11.6% undivided interest owned by ODEC.

*(4) Excludes 40% undivided interest owned by Allegheny Generating Company, a subsidiary of Allegheny Energy, Inc.*

### DOMINION MERCHANT GENERATION

| Plant Coal | Location | Net Summer Capability (MW) |  | Percentage Net Summer Capability |
| --- | --- | ---: | --- | ---: |
| Kincaid | Kincaid, IL | 1,158 | (1) |  |
| Brayton Point | Somerset, MA | 1,105 |  |  |
| State Line | Hammond, IN | 515 |  |  |
| Salem Harbor | Salem, MA | 314 |  |  |
| Morgantown | Morgantown, WV | 25 | (1),(2) |  |
| Total Coal |  | 3,117 |  | 34% |
| **Nuclear** |  |  |  |  |
| Millstone | Waterford, CT | 2,016 | (3) |  |
| Kewaunee | Kewaunee, WI | 556 |  |  |
| Total Nuclear |  | 2,572 |  | 28 |
| **Gas** |  |  |  |  |
| Fairless (CC) | Fairless Hills, PA | 1,196 | (4) |  |
| Elwood (CT) | Elwood, IL | 712 | (1),(5) |  |
| Manchester (CC) | Providence, RI | 432 |  |  |
| Total Gas |  | 2,340 |  | 25 |
| **Oil** |  |  |  |  |
| Salem Harbor | Salem, MA | 438 |  |  |
| Brayton Point | Somerset, MA | 440 |  |  |
| Total Oil |  | 878 |  | 10 |
| **Wind** |  |  |  |  |
| Fowler Ridge | Benton County, IN | 150 | (1),(6) |  |
| NedPower Mt. Storm | Grant County, WV | 132 | (1),(7) |  |
| Total Wind |  | 282 |  | 3 |
| **Various** |  |  |  |  |
| Other | Various | 8 |  | — |
| Total Merchant Generation |  | 9,197 |  | 100% |

#### Note: (CT) denotes combustion turbine and (CC) denotes combined cycle.

#### (1) Subject to a lien securing the facility’s debt.

*(2) Excludes 50% partnership interest owned by RCM Morgantown Power, Ltd. and Hickory Power LLC. Dominion completed the sale of its partnership interest in this facility in January 2011.*

*(3) Excludes 6.53% undivided interest in Unit 3 owned by Massachusetts Municipal Wholesale Electric Company and Central Vermont Public Service Corporation.*

#### (4) Includes generating units that Dominion operates under leasing arrangements.

#### (5) Excludes 50% membership interest owned by J. POWER Elwood, LLC.

#### (6) Excludes 50% membership interest owned by BP.

#### (7) Excludes 50% membership interest owned by Shell.

## Legal proceedings

As filed, 2,396 characters.

From time to time, Dominion and Virginia Power are alleged to be in violation or in default under orders, statutes, rules or regulations relating to the environment, compliance plans imposed upon or agreed to by them, or permits issued by various local, state and federal agencies for the construction or operation of facilities. Administrative proceedings may also be pending on these matters. In addition, in the ordinary course of business, the Companies are involved in various legal proceedings. Dominion and Virginia Power believe that the ultimate resolution of these proceedings will not have a material adverse effect on their financial position, liquidity or results of operations.

See *Regulation* in Item 1. Business, *Future Issues and Other Matters* in Item 7. MD&A, which information is incorporated herein by reference and Notes 14 and 23 to the Consolidated Financial Statements for additional information on various environmental, rate matters and other regulatory proceedings to which Dominion and Virginia Power are parties.

In February 2008, Dominion received a request for information pursuant to Section 114 of the CAA from the EPA. The request concerns historical operating changes and capital improvements undertaken at State Line and Kincaid. In April 2009, Dominion received a second request for information. Dominion provided information in response to both requests. Also in April 2009, Dominion received a Notice and Finding of Violations from the EPA claiming new source review violations, new source performance standards violations, and Title V permit program violations pursuant to the CAA and the respective State Implementation Plans. The Notice states that the EPA may issue an order requiring compliance with the relevant CAA provisions and may seek injunctive relief and/or civil penalties, all pursuant to the EPA’s enforcement authority under the CAA. Dominion cannot predict the outcome of this matter. However, an adverse resolution could have a material effect on future results of operations and/or cash flows.

In May 2010, Dominion received a request for information pursuant to Section 114 of the CAA from the EPA. The request concerns historical operating changes and capital improvements undertaken at Brayton Point and Salem Harbor. Dominion submitted its response to the request in November 2010 and cannot predict the outcome of this matter.

## Management's discussion and analysis

As filed, 105,434 characters.

MD&A discusses Dominion’s and Virginia Power’s results of operations and general financial condition. MD&A should be read in conjunction with Item 1. Business and the Consolidated Financial Statements in Item 8. Financial Statements and Supplementary Data.

### CONTENTS OF MD&A

MD&A consists of the following information:

Ÿ Forward-Looking Statements

Ÿ Accounting Matters

Ÿ Dominion

Ÿ Results of Operations

Ÿ Segment Results of Operations

Ÿ Virginia Power

Ÿ Results of Operations

Ÿ Segment Results of Operations

Ÿ Liquidity and Capital Resources

Ÿ Future Issues and Other Matters

### FORWARD-LOOKING STATEMENTS

This report contains statements concerning Dominion’s and Virginia Power’s expectations, plans, objectives, future financial performance and other statements that are not historical facts. These statements are “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. In most cases, the reader can identify these forward-looking statements by such words as “anticipate,” “estimate,” “forecast,” “expect,” “believe,” “should,” “could,” “plan,” “may,” “continue,” “target” or other similar words.

Dominion and Virginia Power make forward-looking statements with full knowledge that risks and uncertainties exist that may cause actual results to differ materially from predicted results. Factors that may cause actual results to differ are often presented with the forward-looking statements themselves. Additionally, other factors may cause actual results to differ materially from those indicated in any forward-looking statement. These factors include but are not limited to:

Ÿ Unusual weather conditions and their effect on energy sales to customers and energy commodity prices;

Ÿ Extreme weather events, including hurricanes, high winds and severe storms, that can cause outages and property damage to facilities;

Ÿ Federal, state and local legislative and regulatory developments;

Ÿ Changes to federal, state and local environmental laws and regulations, including those related to climate change, the tightening of emission or discharge limits for GHGs and other emissions, more extensive permitting requirements and the regulation of additional substances;

Ÿ Cost of environmental compliance, including those costs related to climate change;

Ÿ Risks associated with the operation of nuclear facilities;

Ÿ Unplanned outages of the Companies’ facilities;

Ÿ Fluctuations in energy-related commodity prices and the effect these could have on Dominion’s earnings and Dominion’s and Virginia Power’s liquidity position and the underlying value of their assets;

Ÿ Counterparty credit and performance risk;

Ÿ Capital market conditions, including the availability of credit and the ability to obtain financing on reasonable terms;

Ÿ Risks associated with Virginia Power’s membership and participation in PJM related to obligations created by the default of other participants;

Ÿ Price risk due to investments held in nuclear decommissioning trusts by Dominion and Virginia Power and in benefit plan trusts by Dominion;

Ÿ Fluctuations in interest rates;

Ÿ Changes in federal and state tax laws and regulations;

Ÿ Changes in rating agency requirements or credit ratings and their effect on availability and cost of capital;

Ÿ Changes in financial or regulatory accounting principles or policies imposed by governing bodies;

Ÿ Employee workforce factors including collective bargaining agreements and labor negotiations with union employees;

Ÿ The risks of operating businesses in regulated industries that are subject to changing regulatory structures;

Ÿ Receipt of approvals for and timing of closing dates for acquisitions and divestitures;

Ÿ Changes in rules for RTOs and ISOs in which Dominion and Virginia Power participate, including changes in rate designs and new and evolving capacity models;

Ÿ Political and economic conditions, including the threat of domestic terrorism, inflation and deflation;

Ÿ Industrial, commercial and residential growth or decline in the Companies’ service areas and changes in customer growth or usage patterns, including as a result of energy conservation programs;

Ÿ Additional competition in electric markets in which Dominion’s merchant generation facilities operate;

Ÿ Changes in technology, particularly with respect to new, developing or alternative sources of generation and smart grid technologies;

Ÿ Changes to regulated electric rates collected by Virginia Power and regulated gas distribution, transportation and storage rates, including LNG storage, collected by Dominion;

Ÿ Timing and receipt of regulatory approvals necessary for planned construction or expansion projects;

Ÿ The inability to complete planned construction projects within the terms and time frames initially anticipated; and

Ÿ Adverse outcomes in litigation matters.

Additionally, other risks that could cause actual results to differ from predicted results are set forth in Item 1A. Risk Factors.

### ACCOUNTING MATTERS

### Critical Accounting Policies and Estimates

Dominion and Virginia Power have identified the following accounting policies, including certain inherent estimates, that as a result of the judgments, uncertainties, uniqueness and complexities of the underlying accounting standards and operations involved, could result in material changes to their financial condition or results of operations under different conditions or using different assumptions. Dominion and Virginia Power have discussed the development, selection and disclosure of each of these policies with the Audit Committee of their Board of Directors. Virginia Power’s Board of Directors also serves as its Audit Committee.

### ACCOUNTING FOR REGULATED OPERATIONS

The accounting for Virginia Power’s regulated electric and Dominion’s regulated gas operations differs from the accounting for nonregulated operations in that they are required to reflect the effect of rate regulation in their Consolidated Financial Statements. For regulated businesses subject to federal or state cost-of-service rate regulation, regulatory practices that assign costs to accounting periods may differ from accounting methods generally applied by nonregulated companies. When it is probable that regulators will permit the recovery of current costs through future rates charged to customers, these costs are deferred as regulatory assets that otherwise would be expensed by nonregulated companies. Likewise, regulatory liabilities are recognized when it is probable that regulators will require customer refunds through future rates or when revenue is collected from customers for expenditures that have yet to be incurred. Generally, regulatory assets and liabilities are amortized into income over the period authorized by the regulator.

The Companies evaluate whether or not recovery of their regulatory assets through future rates is probable and make various assumptions in their analyses. The expectations of future recovery are generally based on orders issued by regulatory commissions or historical experience, as well as discussions with applicable regulatory authorities. If recovery of a regulatory asset is determined to be less than probable, it will be written off in the period such assessment is made. The Companies currently believe the recovery of their regulatory assets is probable. See Notes 13 and 14 to the Consolidated Financial Statements.

### ASSET RETIREMENT OBLIGATIONS

Dominion and Virginia Power recognize liabilities for the expected cost of retiring tangible long-lived assets for which a legal obligation exists. These AROs are recognized at fair value as incurred and are capitalized as part of the cost of the related long-lived assets. In the absence of quoted market prices, the Companies estimate the fair value of their AROs using present value techniques, in which they make various assumptions including estimates of the amounts and timing of future cash flows associated with retirement activities, credit-adjusted risk free rates and cost escalation rates. AROs currently reported in the Consolidated Balance Sheets were measured during a period of historically low interest rates. The impact on measurements of new AROs or remeasurements of existing AROs, using different cost escalation rates in the future, may be significant. When the Companies revise any assumptions used to calculate the fair value of existing AROs, they adjust the carrying amount of both the ARO liability and the related long-lived asset. The Companies accrete the ARO liability to reflect the passage of time.

In 2010, 2009 and 2008, Dominion recognized $85 million, $89 million and $94 million, respectively, of accretion, and expects to recognize $81 million in 2011. In 2010, 2009 and 2008, Virginia Power recognized $35 million, $35 million and $38 million, respectively, of accretion, and expects to recognize $37 million in 2011. Virginia Power records accretion and depreciation associated with utility nuclear decommissioning AROs as an adjustment to its regulatory liability for nuclear decommissioning.

A significant portion of the Companies’ AROs relates to the future decommissioning of Dominion’s merchant and Virginia

Power’s utility nuclear facilities. These nuclear decommissioning AROs are reported in the Dominion Generation segment. At December 31, 2010, Dominion’s nuclear decommissioning AROs totaled $1.4 billion, representing approximately 87% of its total AROs. At December 31, 2010, Virginia Power’s nuclear decommissioning AROs totaled $620 million, representing approximately 92% of its total AROs. Based on their significance, the following discussion of critical assumptions inherent in determining the fair value of AROs relates to those associated with the Companies’ nuclear decommissioning obligations.

The Companies obtain from third-party specialists periodic site-specific base year cost studies in order to estimate the nature, cost and timing of planned decommissioning activities for their nuclear plants. These cost studies are based on relevant information available at the time they are performed; however, estimates of future cash flows for extended periods of time are by nature highly uncertain and may vary significantly from actual results. In addition, the Companies’ cost estimates include cost escalation rates that are applied to the base year costs. The selection of these cost escalation rates is dependent on subjective factors which are considered to be a critical assumption.

The Companies determine cost escalation rates, which represent projected cost increases over time due to both general inflation and increases in the cost of specific decommissioning activities, for each nuclear facility. As a result of the updated decommissioning cost studies and applicable escalation rates obtained in 2009, Dominion recorded a decrease of $309 million in the nuclear decommissioning AROs of its units, including a $103 million ($62 million after-tax) reduction in other operations and maintenance expense due to a downward revision in the nuclear decommissioning ARO for a power station unit that is no longer in service. Virginia Power recorded a decrease of $119 million in the nuclear decommissioning AROs for its units.

### INCOME TAXES

Judgment and the use of estimates are required in developing the provision for income taxes and reporting of tax-related assets and liabilities. The interpretation of tax laws involves uncertainty, since tax authorities may interpret the laws differently. Ultimate resolution of income tax matters may result in favorable or unfavorable impacts to net income and cash flows and adjustments to tax-related assets and liabilities could be material.

Given the uncertainty and judgment involved in the determination and filing of income taxes, there are standards for recognition and measurement in financial statements of positions taken or expected to be taken by an entity in its income tax returns. Positions taken by an entity in its income tax returns that are recognized in the financial statements must satisfy a more-likely-than-not recognition threshold, assuming that the position will be examined by tax authorities with full knowledge of all relevant information. At December 31, 2010, Dominion had $307 million and Virginia Power had $117 million of unrecognized tax benefits. For a substantial amount of these unrecognized tax benefits, the ultimate deductibility is highly certain, but there is uncertainty about the timing of such deductibility.

Deferred income tax assets and liabilities are recorded representing future effects on income taxes for temporary differences between the bases of assets and liabilities for financial reporting and tax purposes. Dominion and Virginia Power evaluate quar- terly the probability of realizing deferred tax assets by reviewing a forecast of future taxable income and the availability of tax planning strategies that can be implemented, if necessary, to realize deferred tax assets. Failure to achieve forecasted taxable income or successfully implement tax planning strategies may affect the realization of deferred tax assets. The Companies establish a valuation allowance when it is more-likely-than-not that all or a portion of a deferred tax asset will not be realized. At December 31, 2010, Dominion had established $68 million of valuation allowances and Virginia Power had no valuation allowances.

### ACCOUNTING FOR DERIVATIVE CONTRACTS AND OTHER INSTRUMENTS AT FAIR VALUE

Dominion and Virginia Power use derivative contracts such as futures, swaps, forwards, options and FTRs to manage commodity and financial market risks of their business operations. Derivative contracts, with certain exceptions, are reported in the Consolidated Balance Sheets at fair value. Accounting requirements for derivatives and related hedging activities are complex and may be subject to further clarification by standard-setting bodies. The majority of investments held in Dominion’s and Virginia Power’s nuclear decommissioning and Dominion’s rabbi and benefit plan trust funds are also subject to fair value accounting. See Notes 7 and 22 to the Consolidated Financial Statements for further information on these fair value measurements.

Fair value is based on actively-quoted market prices, if available. In the absence of actively-quoted market prices, management seeks indicative price information from external sources, including broker quotes and industry publications. When evaluating pricing information provided by brokers and other pricing services, the Companies consider whether the broker is willing and able to trade at the quoted price, if the broker quotes are based on an active market or an inactive market and the extent to which brokers are utilizing a particular model if pricing is not readily available. If pricing information from external sources is not available, or if the Companies believe that observable pricing information is not indicative of fair value, judgment is required to develop the estimates of fair value. In those cases the Companies must estimate prices based on available historical and near-term future price information and use of statistical methods, including regression analysis, that reflect their market assumptions.

The Companies maximize the use of observable inputs and minimize the use of unobservable inputs when measuring fair value.

### USE OF ESTIMATES IN GOODWILL IMPAIRMENT TESTING

As of December 31, 2010, Dominion reported $3.1 billion of goodwill in its Consolidated Balance Sheet. A significant portion resulted from the acquisition of the former CNG in 2000.

In April of each year, Dominion tests its goodwill for potential impairment, and performs additional tests more frequently if an event occurs or circumstances change in the interim that would more-likely-than-not reduce the fair value of a reporting unit below its carrying amount. The 2010, 2009 and 2008 annual tests and any interim tests did not result in the recognition of any goodwill impairment.

In general, Dominion estimates the fair value of its reporting units by using a combination of discounted cash flows and other valuation techniques that use multiples of earnings for peer group companies and analyses of recent business combinations involving

peer group companies. For Dominion’s Appalachian E&P operations, Peoples and Hope and certain DCI operations, negotiated sales prices were used as fair value for the tests conducted in 2010, 2009 and 2008. Fair value estimates are dependent on subjective factors such as Dominion’s estimate of future cash flows, the selection of appropriate discount and growth rates, and the selection of peer group companies and recent transactions. These underlying assumptions and estimates are made as of a point in time; subsequent modifications, particularly changes in discount rates or growth rates inherent in Dominion’s estimates of future cash flows, could result in a future impairment of goodwill. Although Dominion has consistently applied the same methods in developing the assumptions and estimates that underlie the fair value calculations, such as estimates of future cash flows, and based those estimates on relevant information available at the time, such cash flow estimates are highly uncertain by nature and may vary significantly from actual results. If the estimates of future cash flows used in the most recent tests had been 10% lower, the resulting fair values would have still been greater than the carrying values of each of those reporting units tested, indicating that no impairment was present. See Note 12 to the Consolidated Financial Statements for additional information.

### USE OF ESTIMATES IN LONG-LIVED ASSET IMPAIRMENT TESTING

Impairment testing for an individual or group of long-lived assets or for intangible assets with definite lives is required when circumstances indicate those assets may be impaired. When an asset’s carrying amount exceeds the undiscounted estimated future cash flows associated with the asset, the asset is considered impaired to the extent that the asset’s fair value is less than its carrying amount. Performing an impairment test on long-lived assets involves judgment in areas such as identifying if circumstances indicate an impairment may exist, identifying and grouping affected assets, and developing the undiscounted and discounted estimated future cash flows (used to estimate fair value in the absence of market-based value) associated with the asset, including probability weighting such cash flows to reflect expectations about possible variations in their amounts or timing and the selection of an appropriate discount rate. Although cash flow estimates are based on relevant information available at the time the estimates are made, estimates of future cash flows are, by nature, highly uncertain and may vary significantly from actual results. For example, estimates of future cash flows would contemplate factors which may change over time, such as the expected use of the asset, including future production and sales levels, and expected fluctuations of prices of commodities sold and consumed. See Note 7 to the Consolidated Financial Statements for a discussion of impairments related to certain long-lived assets.

### EMPLOYEE BENEFIT PLANS

Dominion sponsors noncontributory defined benefit pension plans and other postretirement benefit plans for eligible active employees, retirees and qualifying dependents. The projected costs of providing benefits under these plans are dependent, in part, on historical information such as employee demographics, the level of contributions made to the plans and earnings on plan assets. Assumptions about the future, including the expected long-term rate of return on plan assets, discount rates applied to benefit obligations and the anticipated rate of increase in healthcare costs and participant compensation, also have a significant impact on employee benefit costs. The impact of changes in these factors, as well as differences between Dominion’s assumptions and actual experience, is generally recognized in the Consolidated Statements of Income over the remaining average service period of plan participants, rather than immediately.

The expected long-term rates of return on plan assets, discount rates and healthcare cost trend rates are critical assumptions. Dominion determines the expected long-term rates of return on plan assets for pension plans and other postretirement benefit plans by using a combination of:

Ÿ Historical return analysis to determine expected future risk premiums, asset volatilities and correlations;

Ÿ Forward-looking return expectations derived from the yield on long-term bonds and the price earnings ratios of major stock market indices;

Ÿ Expected inflation and risk-free interest rate assumptions; and

Ÿ Investment allocation of plan assets. The strategic target asset allocation for Dominion’s pension funds is 28% U.S. equity, 18% non-U.S. equity, 33% fixed income, 3% real estate and 18% other alternative investments, such as private equity investments.

Strategic investment policies are established for each of Dominion’s prefunded benefit plans based upon periodic asset/liability studies. Factors considered in setting the investment policy include those mentioned above such as employee demographics, liability growth rates, future discount rates, the funded status of the plans and the expected long-term rate of return on plan assets. Deviations from the plans’ strategic allocation are a function of Dominion’s assessments regarding short-term risk and reward opportunities in the capital markets and/or short-term market movements which result in the plans’ actual asset allocations varying from the strategic target asset allocations. Through periodic rebalancing, actual allocations are brought back in line with the target.

Dominion develops assumptions, which are then compared to the forecasts of other independent investment advisors to ensure reasonableness. An internal committee selects the final assumptions. Dominion calculated its pension cost using an expected long-term rate of return on plan assets assumption of 8.50% for 2010, 2009 and 2008. Dominion calculated its other postretirement benefit cost using an expected long-term rate of return on plan assets assumption of 7.75% for 2010, 2009 and 2008. The rate used in calculating other postretirement benefit cost is lower than the rate used in calculating pension cost because of differences in the relative amounts of various types of investments held as plan assets.

Dominion determines discount rates from analyses of AA/Aa rated bonds with cash flows matching the expected payments to be made under its plans. The discount rates used to calculate pension cost and other postretirement benefit cost were 6.60% in 2010 and 2009, compared to 6.60% and 6.50%, respectively, in 2008. Dominion selected a discount rate of 5.90% for determining its December 31, 2010 projected pension and other postretirement benefit obligations.

Dominion establishes the healthcare cost trend rate assumption based on analyses of various factors including the specific provisions of its medical plans, actual cost trends experienced and projected, and demographics of plan participants. Dominion’s healthcare cost trend rate assumption as of December 31, 2010 is 7.0% and is expected to gradually decrease to 4.60% by 2060 and continue at that rate for years thereafter.

The following table illustrates the effect on cost of changing the critical actuarial assumptions previously discussed, while holding all other assumptions constant:

*(millions, except percentages)*

|  | Change in Actuarial Assumption | Increase in Net Periodic Cost Pension Benefits | Other Postretirement Benefits |
| --- | ---: | ---: | ---: |
| Discount rate | **(0.25)%** | **$13** | **$5** |
| Long-term rate of return on plan assets | **(0.25)%** | **13** | **3** |
| Healthcare cost trend rate | **1.00%** | **N/A** | **23** |

In addition to the effects on cost, at December 31, 2010, a 0.25% decrease in the discount rate would increase Dominion’s projected pension benefit obligation by $138 million and its accumulated postretirement benefit obligation by $52 million, while a 1.00% increase in the healthcare cost trend rate would increase its accumulated postretirement benefit obligation by $217 million. See Note 22 to the Consolidated Financial Statements for additional information.

### REVENUE RECOGNITION—UNBILLED REVENUE

Virginia Power recognizes and records revenues when energy is delivered to the customer. The determination of sales to individual customers is based on the reading of their meters, which is performed on a systematic basis throughout the month. At the end of each month, the amounts of electric energy delivered to customers, but not yet billed, is estimated and recorded as unbilled revenue. This estimate is reversed in the following month and actual revenue is recorded based on meter readings. Virginia Power’s customer receivables included $397 million and $355 million of accrued unbilled revenue at December 31, 2010 and 2009, respectively.

The calculation of unbilled revenues is complex and includes numerous estimates and assumptions including historical usage, applicable customer rates, weather factors and total daily electric generation supplied, adjusted for line losses. Changes in generation patterns, customer usage patterns and other factors, which are the basis for the estimates of unbilled revenues, could have a significant effect on the calculation and therefore on Virginia Power’s results of operations and financial condition.

### Other

### ACCOUNTING STANDARDS AND POLICIES

During 2009 and 2008, Dominion and Virginia Power were required to adopt several new accounting standards, which are discussed in Note 3 to the Consolidated Financial Statements.

### DOMINION

### RESULTS OF OPERATIONS

Presented below is a summary of Dominion’s consolidated results:

| Year Ended December 31, (millions, except EPS) | 2010 | $ Change | 2009 | $ Change | 2008 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Net Income attributable to Dominion | **$2,808** | **$1,521** | $1,287 | $(547) | $1,834 |
| Diluted EPS | **4.76** | **2.59** | 2.17 | (0.99) | 3.16 |

### Overview

### 2010 VS. 2009

Net income attributable to Dominion increased by 118%. Favorable drivers include a gain on the sale of Dominion’s Appalachian E&P operations, lower ceiling test impairment charges related to these properties, the absence of a charge in connection with the settlement of Virginia Power’s 2009 base rate case proceedings and the impact of favorable weather on electric utility operations. Unfavorable drivers include charges related to a workforce reduction program, a loss on the sale of Peoples, lower margins from merchant generation operations and impairment charges related to certain merchant generation facilities.

### 2009 VS. 2008

Net income attributable to Dominion decreased by 30%. Unfavorable drivers include an impairment charge related to the carrying value of Dominion’s E&P properties due to declines in gas and oil prices during the first quarter of 2009 and a charge in connection with the settlement of Virginia Power’s 2009 base rate case proceedings. Favorable drivers include higher margins in Dominion’s merchant generation operations and a higher contribution from Dominion’s gas transmission operations due to the completion of the Cove Point expansion project.

### Analysis of Consolidated Operations

Presented below are selected amounts related to Dominion’s results of operations:

| Year Ended) December 31, (millions) | 2010 | $ Change | 2009 | $ Change | 2008 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Operating Revenue | **$15,197** | **$399** | $14,798 | $(1,097) | $15,895 |
| Electric fuel and other energy-related purchases | **4,150** | **(135)** | 4,285 | 262 | 4,023 |
| Purchased electric capacity | **453** | **42** | 411 | — | 411 |
| Purchased gas | **2,050** | **(150)** | 2,200 | (966) | 3,166 |
| Net Revenue | **8,544** | **642** | 7,902 | (393) | 8,295 |
| Other operations and maintenance | **3,724** | **12** | 3,712 | 428 | 3,284 |
| Depreciation, depletion and amortization | **1,055** | **(83)** | 1,138 | 104 | 1,034 |
| Other taxes | **532** | **49** | 483 | (10) | 493 |
| Gain on sale of Appalachian E&P operations | **2,467** | **2,467** | — | — | — |
| Other income (loss) | **169** | **(25)** | 194 | 236 | (42) |
| Interest and related charges | **832** | **(57)** | 889 | 60 | 829 |
| Income tax expense | **2,057** | **1,461** | 596 | (357) | 953 |
| Income (loss) from discontinued operations | **(155)** | **(181)** | 26 | (164) | 190 |

An analysis of Dominion’s results of operations follows:

### 2010 VS. 2009

**Net Revenue** increased 8%, primarily reflecting:

Ÿ A $1.1 billion increase from electric utility operations, primarily reflecting:

Ÿ The absence of a charge for the settlement of Virginia Power’s 2009 base rate case proceedings ($570 million);

Ÿ The impact of Riders C1 and C2, R, S and T ($279 million);

Ÿ An increase in sales to retail customers primarily due to an increase in cooling degree days ($248 million); and

Ÿ An increase in ancillary revenues received from PJM ($78 million), primarily reflecting an increase in the scheduled dispatch of gas and oil-fired generation units to meet higher demand; partially offset by

Ÿ A decrease primarily due to the impact of unfavorable economic conditions on customer usage and other factors ($75 million);

Ÿ A $98 million increase from regulated natural gas distribution operations primarily reflecting increased rider revenue associated with the recovery of bad debt expense ($60 million) and an increase in base rates ($40 million); and

Ÿ A $46 million increase related to natural gas transmission operations largely due to the completion of the Cove Point expansion project.

These increases were partially offset by:

Ÿ A $356 million decrease from merchant generation operations due to a decrease at certain nuclear generating facilities ($237 million) primarily due to lower realized prices, a decline in margins at certain fossil generation facilities ($70 million)

primarily due to an increase in fuel prices and the expiration of certain requirements-based power sales contracts in December 2009 ($49 million);

Ÿ A $222 million decrease reflecting the sale of substantially all of Dominion’s Appalachian E&P operations in April 2010; and

Ÿ A $40 million decrease in producer services primarily related to unfavorable price changes on economic hedging positions and lower physical margins, all associated with natural gas aggregation, marketing and trading activities.

**Other operations and maintenance** increased $12 million primarily reflecting:

Ÿ A $240 million net increase in salaries, wages and benefits primarily related to a workforce reduction program. As a result of the program, Dominion expects to avoid future annualized operations and maintenance expenses of approximately $100 million that would have otherwise been incurred;

Ÿ Impairment charges related to certain merchant generating facilities ($194 million);

Ÿ A $103 million increase due to the absence of a benefit in 2009 from a downward revision in the nuclear decommissioning ARO for a unit that is no longer in service;

Ÿ A $56 million increase in bad debt expense at regulated natural gas distribution operations, primarily related to low income assistance programs ($60 million). These expenses are recovered through rates and do not impact net income; and

Ÿ A $42 million increase in certain electric transmission-related expenditures.

These increases were partially offset by:

Ÿ A $434 million decrease in ceiling test impairment charges related to the carrying value of Dominion’s E&P properties;

Ÿ The absence of a $142 million write-off of previously deferred RTO costs in connection with the settlement of Virginia Power’s 2009 base rate case proceedings; and

Ÿ A $48 million decrease in outage costs due to a decrease in scheduled outage days primarily at certain merchant generation facilities.

**DD&A** decreased 7%, primarily due to the sale of Dominion’s Appalachian E&P operations ($45 million) and lower amortization due to decreased cost of emissions allowances consumed ($37 million).

**Other taxes** increased 10%, primarily due to additional property tax from increased investments and higher rates ($16 million), an increase in gross receipts tax due to new non-regulated retail energy customers ($14 million) and higher payroll taxes associated with a workforce reduction program ($12 million).

**Gain on sale of Appalachian E&P operations** reflects a gain on the sale of these operations, as described in Note 4 to the Consolidated Financial Statements.

**Other income** decreased 13%, primarily reflecting an increase in charitable contributions ($46 million) and a decrease in interest income ($15 million); partially offset by the absence of an impairment loss on an equity method investment ($30 million) and higher realized gains (including investment income) on nuclear decommissioning trust funds ($12 million).

**Interest and related charges** decreased 6%, primarily due to a benefit resulting from the net effect of the discontinuance of hedge accounting for certain interest rate hedges and subsequent changes in fair value of these interest rate derivatives ($73 million), partially offset by an increase in interest expense associated with the June 2009 hybrid issuance ($26 million).

**Income tax expense** increased $1.5 billion, primarily reflecting higher federal and state taxes largely due to the gain on the sale of Dominion’s Appalachian E&P business.

**Loss from discontinued operations** primarily reflects a loss on the sale of Peoples.

### 2009 VS. 2008

**Net Revenue** decreased 5%, primarily reflecting:

Ÿ A $614 million decrease in net revenue from electric utility operations primarily due to a charge for the settlement of Virginia Power’s 2009 base rate case proceedings;

Ÿ An $86 million decrease in sales of gas production from E&P operations primarily reflecting the expiration of VPP royalty interests; and

Ÿ A $21 million decrease in net gas revenue from retail energy marketing operations primarily due to lower prices ($39 million), partially offset by higher volumes ($18 million).

These decreases were partially offset by:

Ÿ A $161 million increase from merchant generation operations, primarily reflecting lower fuel expenses due to the impact of lower commodity prices ($190 million) and higher sales volumes primarily from fewer scheduled nuclear refueling outages and higher demand for natural gas generation ($143 million), partially offset by lower sales prices ($79 million) and increased fuel consumption ($93 million) at certain fossil generation facilities;

Ÿ A $158 million increase related to gas transmission operations largely due to the completion of the Cove Point expansion project; and

Ÿ A $70 million increase in net electric revenue from retail energy marketing operations primarily attributable to higher volumes ($36 million) and the acquisition of a retail energy marketing business in September 2008 ($34 million).

**Other operations and maintenance expense** increased 13%, primarily reflecting the combined effects of:

Ÿ A $455 million ceiling test impairment charge related to the carrying value of E&P properties due to declines in natural gas and oil prices;

Ÿ A $142 million write-off of previously deferred RTO costs in connection with the settlement of Virginia Power’s 2009 base rate case proceedings; and

Ÿ A $74 million increase in salaries, wages and benefits largely due to higher pension and other postretirement benefit costs.

These increases were partially offset by:

Ÿ A $103 million downward revision in the nuclear decommissioning ARO for a power station unit that is no longer in service;

Ÿ The absence of a $59 million charge related to the impairment of a DCI investment sold in 2008; and

Ÿ A $29 million decrease largely due to the deferral of electric transmission-related expenditures collectible under certain rate adjustment clauses.

**DD&A** increased 10%, principally due to higher depreciation from property additions ($100 million) and higher amortization due to increased consumption of emissions allowances ($37 million), partially offset by decreased DD&A reflecting lower gas and oil production ($19 million) and a decrease in DD&A rates ($28 million) at Dominion’s E&P properties.

**Other income (loss)** increased $236 million primarily due to the impact of net realized gains (including investment income) on merchant nuclear decommissioning trust funds in 2009 as compared to net realized losses (net of investment income) in 2008.

**Interest and related charges** increased 7%, primarily due to the impact of additional borrowings ($34 million) and the absence of a $23 million benefit related to the redemption of Virginia Power’s Callable and Puttable Enhanced Securities in 2008.

**Income tax expense** decreased by 37%, primarily reflecting lower pre-tax income in 2009.

### Outlook

In order to deliver favorable returns to investors, Dominion’s strategy is to continue focusing on its regulated businesses while maintaining upside potential in well-positioned nonregulated businesses. The goals of this strategy are to provide earnings per share growth, a growing dividend and a stable credit profile. Dominion’s 2010 results were positively impacted by the gain on the sale of substantially all of its Appalachian E&P operations. In 2011, Dominion’s operating businesses will likely experience a decrease in net income on a per share basis as compared to 2010. Dominion’s anticipated 2011 results reflect the following significant factors:

Ÿ Lower realized margins from its merchant generation operations due to lower commodity prices and an increase in planned outages at certain nuclear and fossil facilities;

Ÿ A return to normal weather in its electric utility operations; and

Ÿ The absence of earnings from Appalachian E&P operations sold in April 2010; partially offset by

Ÿ Growth in electric sales resulting from the recovering economy;

Ÿ A benefit from rate adjustment clause revenue associated with Bear Garden and Virginia City Hybrid Energy Center;

Ÿ A reduction in certain operations and maintenance expenses resulting largely from the implementation of cost-containment measures, including the workforce reduction program discussed in Note 23 to the Consolidated Financial Statements; and

Ÿ Lower outage costs at certain electric utility generating facilities.

Dominion also expects the bonus depreciation provisions of the tax legislation recently enacted by the U.S. Congress in 2010, discussed in Note 6 to the Consolidated Financial Statements, to reduce income taxes otherwise payable by $1.2 billion to $2.1 billion during 2011 through 2013. The acceleration of these tax deductions is expected to reduce the domestic production activities income tax deduction through 2012 and will also increase deferred taxes, thereby reducing rate base for regulated operations. However, Dominion plans to partially mitigate the earnings per share impact of these items by using the cash tax savings to

repurchase common stock in 2011 and reduce the amount of debt that would have otherwise been issued over the next three years. In addition, Dominion does not plan any market issuances of common stock in 2011 or 2012.

Dominion expects its operating businesses to provide five percent to six percent growth in net income on a per share basis in 2012 as compared to 2011 primarily due to its assumptions regarding construction and operation of new infrastructure in its utility operations, fewer merchant outages and an anticipated rise in commodity prices and energy demand.

### SEGMENT RESULTS OF OPERATIONS

Segment results include the impact of intersegment revenues and expenses, which may result in intersegment profit or loss. Presented below is a summary of contributions by Dominion’s operating segments to net income attributable to Dominion:

| Year Ended December 31, (millions, except EPS) | 2010 Net Income attribut- able to Dominion | Diluted EPS | 2009 Net Income (loss) attribut- able to Dominion | Diluted EPS | 2008 Net Income (loss) attribut- able to Dominion | Diluted EPS |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| DVP | **$448** | **$0.76** | $384 | $0.65 | $380 | $0.65 |
| Dominion Generation | **1,291** | **2.19** | 1,281 | 2.16 | 1,227 | 2.11 |
| Dominion Energy | **475** | **0.80** | 517 | 0.87 | 470 | 0.81 |
| Primary operating segments | **2,214** | **3.75** | 2,182 | 3.68 | 2,077 | 3.57 |
| Corporate and Other | **594** | **1.01** | (895) | (1.51) | (243) | (0.41) |
| Consolidated | **$2,808** | **$4.76** | $1,287 | $2.17 | $1,834 | $3.16 |

### DVP

Presented below are operating statistics related to DVP’s operations:

| Year Ended December 31, | 2010 | % Change | 2009 | % Change | 2008 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Electricity delivered (million MWh) | **84.5** | **4%** | 81.4 | (3)% | 84.0 |
| Degree days: |  |  |  |  |  |
| Cooling(1) | **2,090** | **42** | 1,477 | (9) | 1,621 |
| Heating(2) | **3,819** | **2** | 3,747 | 9 | 3,426 |
| Average electric distribution customer accounts (thousands)(3) | **2,422** | **1** | 2,404 | 1 | 2,386 |
| Average retail energy marketing customer accounts (thousands)(3) | **2,037** | **19** | 1,718 | 7 | 1,601 |

*(1) Cooling degree days are units measuring the extent to which the average daily temperature is greater than 65 degrees, and are calculated as the difference between 65 degrees and the average temperature for that day.*

*(2) Heating degree days are units measuring the extent to which the average daily temperature is less than 65 degrees, and are calculated as the difference between 65 degrees and the average temperature for that day.*

#### (3) Thirteen-month average.

Presented below, on an after-tax basis, are the key factors impacting DVP’s net income contribution:

### 2010 VS. 2009

| (millions, except EPS) Regulated electric sales: | Increase (Decrease) Amount | EPS |
| --- | ---: | ---: |
| Weather | **$48** | **$0.08** |
| FERC transmission revenue | **40** | **0.07** |
| Other | **(4)** | **(0.01)** |
| Depreciation and amortization | **(15)** | **(0.03)** |
| Storm damage and service restoration-distribution operations(1) | **(11)** | **(0.02)** |
| Other | **6** | **0.01** |
| Share accretion | **—** | **0.01** |
| Change in net income contribution | **$64** | **$0.11** |

*(1) Reflects an increase in storm damage and service restoration costs associated with electric distribution operations resulting from more severe weather during 2010.*

### 2009 VS. 2008

| (millions, except EPS) Regulated electric sales: | Increase (Decrease) Amount | EPS |
| --- | ---: | ---: |
| FERC transmission revenue | $28 | $0.05 |
| Customer growth | 5 | 0.01 |
| Other(1) | (14) | (0.02) |
| Storm damage and service restoration-distribution operations(2) | 5 | 0.01 |
| Depreciation and amortization | (7) | (0.01) |
| Other | (13) | (0.03) |
| Share dilution | — | (0.01) |
| Change in net income contribution | $4 | $— |

*(1) Primarily reflects the impact of unfavorable economic conditions on customer usage and other factors.*

*(2) Reflects a decrease in storm damage and service restoration costs associated with electric distribution operations resulting from less severe weather during 2009.*

### Dominion Generation

Presented below are operating statistics related to Dominion Generation’s operations:

| Year Ended December 31, Electricity supplied (million MWh): | 2010 | % Change | 2009 | % Change | 2008 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Utility | **84.5** | **4%** | 81.4 | (3)% | 84.0 |
| Merchant | **47.3** | **(1)** | 48.0 | 6 | 45.3 |
| Degree days (electric utility service area): |  |  |  |  |  |
| Cooling | **2,090** | **42** | 1,477 | (9) | 1,621 |
| Heating | **3,819** | **2** | 3,747 | 9 | 3,426 |

Presented below, on an after-tax basis, are the key factors impacting Dominion Generation’s net income contribution:

### 2010 VS. 2009

| (millions, except EPS) Regulated electric sales: | Increase (Decrease) Amount | EPS |
| --- | ---: | ---: |
| Weather | **$104** | **$0.18** |
| Rate adjustment clause revenue | **95** | **0.16** |
| Other | **(23)** | **(0.04)** |
| Outage costs | **29** | **0.05** |
| Other O&M expenses(1) | **32** | **0.05** |
| PJM ancillary services | **27** | **0.05** |
| Merchant generation margin | **(209)** | **(0.36)** |
| Income and other taxes(2) | **(44)** | **(0.08)** |
| Other | **(1)** | **—** |
| Share accretion | **—** | **0.02** |
| Change in net income contribution | **$10** | **$0.03** |

*(1) Reflects the 2010 implementation of cost containment measures including a workforce reduction program.*

*(2) Reflects the absence of 2009 investment tax credits related to Fowler Ridge and a decrease in the domestic production activities deduction, primarily due to the absence of a 2009 benefit from the remeasurement of tax uncertainties related to this deduction, as well as the 2010 impact of bonus depreciation on this deduction.*

### 2009 VS. 2008

| (millions, except EPS) | Increase (Decrease) Amount | EPS |
| --- | ---: | ---: |
| Merchant generation margin | $95 | $0.16 |
| Outage costs | 7 | 0.01 |
| Regulated electric sales: |  |  |
| Customer growth | 10 | 0.02 |
| Rate adjustment clause revenue(1) | 53 | 0.09 |
| Other(2) | (59) | (0.10) |
| Depreciation and amortization | (42) | (0.07) |
| Sales of emissions allowances | (18) | (0.03) |
| Other | 8 | 0.01 |
| Share dilution | — | (0.04) |
| Change in net income contribution | $54 | $0.05 |

#### (1) Reflects the incremental impact of Rider S.

*(2) Primarily reflects lower sales to wholesale customers, as well as the impact of unfavorable economic conditions on customer usage and other factors.*

### Dominion Energy

Presented below are selected operating statistics related to Dominion Energy’s operations. As discussed in Note 4, in April 2010 Dominion completed the sale of substantially all of its Appalachian E&P operations. As a result, production-related operating statistics for the Dominion Energy segment are no longer significant.

| Year Ended December 31, Gas distribution throughput (bcf): | 2010 | % Change | 2009 | % Change | 2008 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Sales | **31** | **(28)%** | 43 | (31)% | 62 |
| Transportation | **241** | **16** | 208 | (8) | 225 |
| Heating degree days | **5,682** | **(3)** | 5,847 | (4) | 6,065 |
| Average gas distribution customer accounts (thousands)(1): |  |  |  |  |  |
| Sales | **260** | **(19)** | 321 | (36) | 503 |
| Transportation | **1,042** | **5** | 988 | 21 | 814 |

#### (1) Thirteen-month average.

Presented below, on an after-tax basis, are the key factors impacting Dominion Energy’s net income contribution:

### 2010 VS. 2009

| (millions, except EPS) | Increase (Decrease) Amount | EPS |
| --- | ---: | ---: |
| E&P disposed operations | **$(61)** | **$(0.11)** |
| Producer services | **(27)** | **(0.05)** |
| Gas distribution margin: |  |  |
| AMR and PIR revenue(1) | **11** | **0.02** |
| Base gas sale(2) | **10** | **0.02** |
| Weather | **(2)** | **—** |
| Other | **15** | **0.03** |
| Cove Point expansion revenue | **20** | **0.03** |
| Other | **(8)** | **(0.02)** |
| Share accretion | **—** | **0.01** |
| Change in net income contribution | **$(42)** | **$(0.07)** |

*(1) Primarily reflects an allowed return on investment through the AMR and PIR programs.*

*(2) Reflects East Ohio’s sale of 3 bcf of base gas in December 2010 as the Company determined that it could operate its storage system and meet existing and anticipated contractual commitments with less base gas.*

### 2009 VS. 2008

| (millions, except EPS) | Increase (Decrease) Amount | EPS |
| --- | ---: | ---: |
| Cove Point expansion revenue | $88 | $0.15 |
| DD&A-gas and oil | 28 | 0.04 |
| Producer services | 10 | 0.02 |
| Gas and oil-production(1) | (63) | (0.11) |
| Change in state tax legislation(2) | (16) | (0.02) |
| Share dilution | — | (0.02) |
| Change in net income contribution | $47 | $0.06 |

*(1) Primarily reflects a decrease in volumes associated with VPP royalty interests that expired in February 2009.*

*(2) Reflects the absence of a 2008 benefit resulting from the reduction of deferred tax liabilities related to the enactment of West Virginia income tax rate reductions.*

### Corporate and Other

Presented below are the Corporate and Other segment’s after-tax results:

| Year Ended December 31, (millions, except EPS amounts) | 2010 | 2009 | 2008 |
| --- | ---: | ---: | ---: |
| Specific items attributable to operating segments | **$1,014** | $(688) | $(134) |
| Specific items attributable to Corporate and Other segment: |  |  |  |
| Peoples discontinued operations | **(155)** | 26 | 192 |
| Other | **(22)** | 7 | (61) |
| Total specific items | **837** | (655) | (3) |
| Other corporate operations | **(243)** | (240) | (240) |
| Total net benefit (expense) | **$594** | $(895) | $(243) |
| EPS impact | **$1.01** | $(1.51) | $(0.41) |

### TOTAL SPECIFIC ITEMS

Corporate and Other includes specific items attributable to Dominion’s primary operating segments that are not included in profit measures evaluated by executive management in assessing the segments’ performance or allocating resources among the segments. See Note 27 to the Consolidated Financial Statements for discussion of these items.

### VIRGINIA POWER

### RESULTS OF OPERATIONS

Presented below is a summary of Virginia Power’s consolidated results:

| Year Ended December 31, (millions) | 2010 | $ Change | 2009 | $ Change | 2008 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Net Income | **$852** | **$496** | $356 | $(508) | $864 |

### Overview

### 2010 VS. 2009

Net income increased by 139%, primarily reflecting the absence of a charge in connection with the settlement of the 2009 base rate case proceedings, favorable weather and a benefit from rate adjustment clauses, partially offset by charges related to a workforce reduction program.

### 2009 VS. 2008

Net income decreased 59%, primarily due to a charge in connection with the settlement of the 2009 base rate case proceedings and an increase in outage costs related to scheduled outages at certain nuclear and fossil generating facilities.

### Analysis of Consolidated Operations

Presented below are selected amounts related to Virginia Power’s results of operations:

| Year Ended December 31, (millions) | 2010 | $ Change | 2009 | $ Change | 2008 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Operating Revenue | **$7,219** | **$635** | $6,584 | $(350) | $6,934 |
| Electric fuel and other energy-related purchases | **2,495** | **(477)** | 2,972 | 265 | 2,707 |
| Purchased electric capacity | **449** | **40** | 409 | (1) | 410 |
| Net Revenue | **4,275** | **1,072** | 3,203 | (614) | 3,817 |
| Other operations and maintenance | **1,745** | **122** | 1,623 | 218 | 1,405 |
| Depreciation and amortization | **671** | **30** | 641 | 33 | 608 |
| Other taxes | **218** | **27** | 191 | 8 | 183 |
| Other income | **100** | **(4)** | 104 | 52 | 52 |
| Interest and related charges | **347** | **(2)** | 349 | 40 | 309 |
| Income tax expense | **542** | **395** | 147 | (353) | 500 |

### 41

An analysis of Virginia Power’s results of operations follows:

### 2010 VS. 2009

**Net Revenue** increased 33%, primarily reflecting:

Ÿ The absence of a charge for the settlement of the 2009 base rate case proceedings ($570 million);

Ÿ The impact of Riders C1 and C2, R, S and T ($279 million);

Ÿ An increase in sales to retail customers primarily due to an increase in cooling degree days ($248 million); and

Ÿ An increase in ancillary revenues received from PJM ($78 million), primarily reflecting an increase in the scheduled dispatch of gas and oil-fired generation units to meet higher demand.

These increases were partially offset by:

Ÿ A decrease primarily due to the impact of unfavorable economic conditions on customer usage and other factors ($75 million).

**Other operations and maintenance** increased 8%, primarily reflecting:

Ÿ A $177 million net increase in salaries, wages and benefits primarily due to a workforce reduction program. As a result of the program, Virginia Power expects to avoid future annualized operations and maintenance expenses of approximately $50 million that would have otherwise been incurred;

Ÿ A $42 million increase in certain electric transmission-related expenditures; and

Ÿ A $19 million increase in storm damage and service restoration costs.

These increases were partially offset by:

Ÿ The absence of a $130 million write-off of previously deferred RTO costs in connection with the settlement of Virginia Power’s 2009 base rate case proceedings.

**Depreciation and amortization expense** increased 5%, primarily due to property additions.

**Other taxes** increased 14%, primarily reflecting additional property tax due to increased investments and higher rates ($12 million), incremental use tax that is recoverable through a customer surcharge ($8 million) and higher payroll taxes associated with a workforce reduction program ($7 million).

**Income tax expense** increased $395 million, primarily reflecting higher pretax income in 2010.

### 2009 VS. 2008

**Net Revenue** decreased 16%, primarily due to a charge for the settlement of the 2009 base rate case proceedings.

**Other operations and maintenance expense** increased 16%, primarily reflecting:

Ÿ A $130 million write-off of previously deferred RTO costs in connection with the settlement of Virginia Power’s 2009 base rate case proceedings;

Ÿ A $64 million increase in outage costs related to scheduled outages at certain nuclear and fossil generating facilities;

Ÿ A $43 million increase resulting from higher salaries, wages and benefits largely due to higher pension and other postretirement benefit costs, and other general and administrative costs; and

Ÿ A $28 million decrease in gains from the sale of emissions allowances.

These increases were partially offset by:

Ÿ A $29 million decrease largely due to the deferral of transmission-related expenditures collectible under certain rate adjustment clauses.

**Depreciation and amortization expense** increased 5%, primarily due to property additions.

**Other income** increased by $52 million primarily due to an increase in the equity component of AFUDC as a result of construction and expansion projects.

**Interest and related charges** increased 13%, primarily due to the absence of a $23 million benefit related to the redemption of Virginia Power’s Callable and Puttable Enhanced Securities in 2008, and a $17 million impact largely due to the impact from additional borrowings.

**Income tax expense** decreased 71%, reflecting lower pre-tax income in 2009.

### Outlook

Virginia Power expects to provide growth in net income in 2011. Virginia Power’s anticipated 2011 results reflect the following significant factors:

Ÿ Growth in electric sales resulting from the recovering economy;

Ÿ A benefit from rate adjustment clause revenue associated with Bear Garden and Virginia City Hybrid Energy Center;

Ÿ A reduction in certain operations and maintenance expenses resulting largely from the implementation of cost-containment measures, including the workforce reduction program discussed in Note 23 to the Consolidated Financial Statements; and

Ÿ Lower outage costs at certain generating facilities; partially offset by

Ÿ A return to normal weather in its electric utility operations.

Virginia Power also expects the bonus depreciation provisions of the tax legislation recently enacted by the U.S. Congress in 2010, discussed in Note 6 to the Consolidated Financial Statements, to reduce income taxes otherwise payable by $600 million to $1.2 billion during 2011 through 2013. The acceleration of these tax deductions is expected to reduce the domestic production activities income tax deduction through 2012 and will also increase deferred taxes, thereby reducing the regulated rate base. However, Virginia Power plans to partially mitigate the earnings impact of these items by using the cash tax savings to reduce the amount of debt that would have otherwise been issued over the next three years.

### SEGMENT RESULTS OF OPERATIONS

Presented below is a summary of contributions by Virginia Power’s operating segments to net income:

| Year Ended December 31, (millions) | 2010 | $ Change | 2009 | $ Change | 2008 |
| --- | ---: | ---: | ---: | ---: | ---: |
| DVP | **$377** | **$64** | $313 | $6 | $307 |
| Dominion Generation | **630** | **155** | 475 | (108) | 583 |
| Primary operating segments | **1,007** | **219** | 788 | (102) | 890 |
| Corporate and Other | **(155)** | **277** | (432) | (406) | (26) |
| Consolidated | **$852** | **$496** | $356 | $(508) | $864 |

### 42

### DVP

Presented below are operating statistics related to Virginia Power’s DVP segment:

| Year Ended December 31, | 2010 | % Change | 2009 | % Change | 2008 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Electricity delivered (million MWh) | **84.5** | **4%** | 81.4 | (3)% | 84.0 |
| Degree days (electric service area): |  |  |  |  |  |
| Cooling(1) | **2,090** | **42** | 1,477 | (9) | 1,621 |
| Heating(2) | **3,819** | **2** | 3,747 | 9 | 3,426 |
| Average electric distribution customer accounts (thousands)(3) | **2,422** | **1** | 2,404 | 1 | 2,386 |

*(1) Cooling degree days are units measuring the extent to which the average daily temperature is greater than 65 degrees, and are calculated as the difference between 65 degrees and the average temperature for that day.*

*(2) Heating degree days are units measuring the extent to which the average daily temperature is less than 65 degrees, and are calculated as the difference between 65 degrees and the average temperature for that day.*

#### (3) Thirteen-month average.

Presented below, on an after-tax basis, are the key factors impacting DVP’s net income contribution:

### 2010 VS. 2009

| (millions, except EPS) Regulated electric sales: | Increase (Decrease) |
| --- | ---: |
| Weather | **$48** |
| FERC transmission revenue | **40** |
| Other | **(4)** |
| Depreciation and amortization | **(15)** |
| Storm damage and service restoration—distribution operations(1) | **(11)** |
| Other | **6** |
| Change in net income contribution | **$64** |

*(1) Reflects an increase in storm damage and service restoration costs associated with electric distribution operations resulting from more severe weather during 2010.*

### 2009 VS. 2008

| (millions) Regulated electric sales: | Increase (Decrease) |
| --- | ---: |
| FERC transmission revenue | $28 |
| Customer growth | 5 |
| Other(1) | (14) |
| Storm damage and service restoration—distribution operations(2) | 5 |
| Depreciation and amortization | (7) |
| Other | (11) |
| Change in net income contribution | $6 |

*(1) Primarily reflects the impact of unfavorable economic conditions on customer usage and other factors.*

*(2) Reflects a decrease in storm damage and service restoration costs associated with electric distribution operations resulting from less severe weather during 2009.*

### Dominion Generation

Presented below are operating statistics related to Virginia Power’s Dominion Generation segment:

| Year Ended December 31, | 2010 | % Change | 2009 | % Change | 2008 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Electricity supplied (million MWh) | **84.5** | **4%** | 81.4 | (3)% | 84.0 |
| Degree days (electric service area): |  |  |  |  |  |
| Cooling | **2,090** | **42** | 1,477 | (9) | 1,621 |
| Heating | **3,819** | **2** | 3,747 | 9 | 3,426 |

Presented below, on an after-tax basis, are the key factors impacting Dominion Generation’s net income contribution:

### 2010 VS. 2009

| (millions) Regulated electric sales: | Increase (Decrease) |
| --- | ---: |
| Weather | **$104** |
| Rate adjustment clause revenue | **95** |
| Other | **(23)** |
| PJM ancillary services | **27** |
| Income and other taxes(1) | **(24)** |
| Energy supply margin(2) | **(13)** |
| Other | **(11)** |
| Change in net income contribution | **$155** |

*(1) Reflects a decrease in the domestic production activities deduction, primarily due to the absence of a 2009 benefit from the remeasurement of tax uncertainties related to this deduction, as well as the 2010 impact of bonus depreciation on this deduction.*

*(2) Primarily reflects a reduced benefit from FTRs, due to the crediting of certain FTRs allocated to Virginia Power against Virginia jurisdictional fuel factor expenses subject to deferral accounting beginning July 1, 2009.*

### 2009 VS. 2008

| (millions) | Increase (Decrease) |
| --- | ---: |
| Outage costs | $(36) |
| PJM ancillary services | (21) |
| Sale of emissions allowances | (17) |
| Interest expense | (15) |
| Depreciation expense | (13) |
| Regulated electric sales: |  |
| Customer growth | 10 |
| Rate adjustment clause revenue(1) | 53 |
| Other(2) | (59) |
| Other | (10) |
| Change in net income contribution | $(108) |

#### (1) Reflects the incremental impact of Rider S.

*(2) Primarily reflects lower sales to wholesale customers, as well as the impact of unfavorable economic conditions on customer usage and other factors.*

### Corporate and Other

Presented below are the Corporate and Other segment’s after-tax results.

| Year Ended December 31, (millions) | 2010 | 2009 | 2008 |
| --- | ---: | ---: | ---: |
| Specific items attributable to operating segments | **$(153)** | $(430) | $(23) |
| Other corporate operations | **(2)** | (2) | (3) |
| Total net expense | **$(155)** | $(432) | $(26) |

### 43

### SPECIFIC ITEMS ATTRIBUTABLE TO OPERATING SEGMENTS

Corporate and Other primarily includes specific items attributable to Virginia Power’s primary operating segments that are not included in profit measures evaluated by executive management in assessing the segments’ performance or allocating resources among the segments. See Note 27 to the Consolidated Financial Statements for a discussion of these items.

### LIQUIDITY AND CAPITAL RESOURCES

Dominion and Virginia Power depend on both internal and external sources of liquidity to provide working capital and to fund capital requirements. Short-term cash requirements not met by cash provided by operations are generally satisfied with proceeds from short-term borrowings. Long-term cash needs are met through issuances of debt and/or equity securities.

At December 31, 2010, Dominion had $2 billion of unused capacity under its credit facilities, including $559 million of unused capacity under joint credit facilities available to Virginia Power. See additional discussion under *Credit Facilities and Short-Term Debt.*

A summary of Dominion’s cash flows is presented below:

| Year Ended December 31, (millions) | 2010 | 2009 | 2008 |
| --- | ---: | ---: | ---: |
| Cash and cash equivalents at beginning of year | **$50** | $71 | $287 |
| Cash flows provided by (used in): |  |  |  |
| Operating activities | **1,825** | 3,786 | 2,676 |
| Investing activities | **419** | (3,695) | (3,490) |
| Financing activities | **(2,232)** | (112) | 598 |
| Net increase (decrease) in cash and cash equivalents | **12** | (21) | (216) |
| Cash and cash equivalents at end of year(1) | **$62** | $50 | $71 |

*(1) 2009 and 2008 amounts include $2 million and $5 million, respectively, of cash classified as held for sale in Dominion’s Consolidated Balance Sheets.*

A summary of Virginia Power’s cash flows is presented below:

| Year Ended December 31, (millions) | 2010 | 2009 | 2008 |
| --- | ---: | ---: | ---: |
| Cash and cash equivalents at beginning of year | **$19** | $27 | $49 |
| Cash flows provided by (used in): |  |  |  |
| Operating activities | **1,409** | 1,970 | 1,235 |
| Investing activities | **(2,425)** | (2,568) | (2,003) |
| Financing activities | **1,002** | 590 | 746 |
| Net decrease in cash and cash equivalents | **(14)** | (8) | (22) |
| Cash and cash equivalents at end of year | **$5** | $19 | $27 |

### Operating Cash Flows

In 2010, net cash provided by Dominion’s operating activities decreased by approximately $2 billion, primarily due to lower deferred fuel and gas cost recoveries, contributions to Dominion’s pension plans, the absence of disposed Appalachian E&P operations, lower merchant generation margins and refunds related to the 2009 Virginia Power base rate case settlement, partially offset

by lower income tax payments, lower margin collateral requirements and the favorable impact of weather and rate adjustment clauses on electric utility operations.

In 2010, net cash provided by Virginia Power’s operating activities decreased by $561 million, primarily due to lower deferred fuel cost recoveries in its Virginia jurisdiction, refunds related to the 2009 Virginia base rate case settlement, and contributions to Dominion’s pension plans; partially offset by the favorable impact of weather and rate adjustment clauses, and cash received for income tax benefits in 2010, as compared to income taxes paid in 2009.

Dominion’s lower income tax payments and Virginia Power’s realization of income tax benefits in 2010 resulted in part from the bonus depreciation provisions of the tax legislation recently enacted by the U.S. Congress, discussed in Note 6 to the Consolidated Financial Statements.

Dominion believes that its operations provide a stable source of cash flow to contribute to planned levels of capital expenditures and maintain or grow the dividend on common shares. In 2011, Dominion’s board of directors adopted a new dividend policy that raised its target payout ratio. The Board established an annual dividend rate of $1.97 per share of common stock, a 7.7% increase over the 2010 rate. Quarterly dividends are subject to declaration by the Board. Virginia Power believes that its operations provide a stable source of cash flow to contribute to planned levels of capital expenditures and provide dividends to Dominion.

The Companies’ operations are subject to risks and uncertainties that may negatively impact the timing or amounts of operating cash flows which are discussed in Item 1A. Risk Factors.

### CREDIT RISK

Dominion’s exposure to potential concentrations of credit risk results primarily from its energy marketing and price risk management activities. Presented below is a summary of Dominion’s credit exposure as of December 31, 2010 for these activities. Gross credit exposure for each counterparty is calculated as outstanding receivables plus any unrealized on or off-balance sheet exposure, taking into account contractual netting rights.

| (millions) | Gross Credit Exposure | Credit Collateral | Net Credit Exposure |
| --- | ---: | ---: | ---: |
| Investment grade(1) | **$426** | **$26** | **$400** |
| Non-investment grade(2) | **10** | **3** | **7** |
| No external ratings: |  |  |  |
| Internally rated-investment grade(3) | **102** | **—** | **102** |
| Internally rated-non-investment grade(4) | **82** | **—** | **82** |
| Total | **$620** | **$29** | **$591** |

*(1) Designations as investment grade are based upon minimum credit ratings assigned by Moody’s and Standard & Poor’s. The five largest counterparty exposures, combined, for this category represented approximately 33% of the total net credit exposure.*

*(2) The five largest counterparty exposures, combined, for this category represented approximately 1% of the total net credit exposure.*

*(3) The five largest counterparty exposures, combined, for this category represented approximately 11% of the total net credit exposure.*

*(4) The five largest counterparty exposures, combined, for this category represented approximately 8% of the total net credit exposure.*

Virginia Power’s exposure to potential concentrations of credit risk results primarily from sales to wholesale customers and is not considered material at December 31, 2010.

### Investing Cash Flows

In 2010, net cash provided by Dominion’s investing activities was $419 million as compared to net cash used in investing activities of $3.7 billion in 2009. This change is primarily due to the proceeds received from the sale of substantially all of Dominion’s Appalachian E&P operations in April 2010 and the sale of Peoples in February 2010. While taxes and other costs of the sales are reflected in cash flow from operations, the gross proceeds from the sales are reported in cash flow from investing activities.

In 2010, net cash used in Virginia Power’s investing activities decreased by $143 million, primarily due to lower capital expenditures, partially offset by an increase in restricted cash equivalents designated to finance certain qualifying facilities.

### Financing Cash Flows and Liquidity

Dominion and Virginia Power rely on capital markets as significant sources of funding for capital requirements not satisfied by cash provided by their operations. As discussed in *Credit Ratings*, the Companies’ ability to borrow funds or issue securities and the return demanded by investors are affected by credit ratings. In addition, the raising of external capital is subject to certain regulatory requirements, including registration with the SEC for certain issuances and, in the case of Virginia Power, approval by the Virginia Commission.

Each of the Companies currently meets the definition of a well-known seasoned issuer under SEC rules governing the registration, communications and offering processes under the Securities Act of 1933. The rules provide for a streamlined shelf registration process to provide registrants with timely access to capital. This allows the Companies to use automatic shelf registration statements to register any offering of securities, other than those for business combination transactions.

In 2010, net cash used in Dominion’s financing activities increased by $2.1 billion, primarily due to net debt repayments in 2010 as compared to net debt issuances in 2009, and net repurchases of common stock in 2010 as compared to issuances of common stock in 2009. This reflects the use of proceeds from the sales of Dominion’s Appalachian E&P operations and Peoples.

In 2010, net cash provided by Virginia Power’s financing activities increased by $412 million, primarily due to higher net debt issuances in 2010 as compared to 2009, as a result of lower cash flow from operations.

### CREDIT FACILITIES AND SHORT-TERM DEBT

Dominion and Virginia Power use short-term debt to fund working capital requirements and as a bridge to long-term debt financings. The levels of borrowing may vary significantly during the course of the year, depending upon the timing and amount of cash requirements not satisfied by cash from operations. In addition, Dominion utilizes cash and letters of credit to fund collateral requirements. Collateral requirements are impacted by commodity prices, hedging levels, Dominion’s credit ratings and the credit quality of its counterparties. Dominion and Virginia Power replaced certain of their existing credit facilities in September 2010, as noted below.

In connection with commodity hedging activities, the Companies are required to provide collateral to counterparties under some circumstances. Under certain collateral arrangements, the Companies may satisfy these requirements by electing to either deposit cash, post letters of credit or, in some cases, utilize other forms of security. From time to time, the Companies vary the form of collateral provided to counterparties after weighing the costs and benefits of various factors associated with the different forms of collateral. These factors include short-term borrowing and short-term investment rates, the spread over these short-term rates at which the Companies can issue commercial paper, balance sheet impacts, the costs and fees of alternative collateral postings with these and other counterparties and overall liquidity management objectives.

### DOMINION

Commercial paper and letters of credit outstanding, as well as capacity available under credit facilities were as follows:

| At December 31, 2010 (millions) | Facility Limit | Outstanding Commercial Paper |  | Outstanding Letters of Credit | Facility Capacity Available |
| --- | ---: | ---: | ---: | ---: | ---: |
| Three-year joint revolving credit facility(1) | **$3,000** | **$1,386** |  | **$101** | **$1,513** |
| Three-year joint revolving credit facility(2) | **500** | **—** |  | **35** | **465** |
| Total | **$3,500** | **$1,386** | **(3)** | **$136** | **$1,978** |

*(1) This credit facility was entered into in September 2010 and terminates in September 2013. This credit facility can be used to support bank borrowings and the issuance of commercial paper, as well as to support up to $1.5 billion of letters of credit.*

*(2) This credit facility was entered into in September 2010 and terminates in September 2013. This credit facility can be used to support bank borrowings, commercial paper and letter of credit issuances.*

*(3) The weighted-average interest rate of the outstanding commercial paper supported by Dominion’s credit facilities was 0.41% at December 31, 2010.*

### VIRGINIA POWER

Virginia Power’s short-term financing is supported by two three-year joint revolving credit facilities with Dominion. These credit facilities are being used for working capital, as support for the combined commercial paper programs of Dominion and Virginia Power and for other general corporate purposes.

Virginia Power’s share of commercial paper and letters of credit outstanding, as well as its capacity available under its joint credit facilities with Dominion were as follows:

| At December 31, 2010 (millions) | Facility Sub-limit | Outstanding Commercial Paper |  | Outstanding Letters of Credit | Facility Capacity Available |
| --- | ---: | ---: | ---: | ---: | ---: |
| Three-year joint revolving credit facility(1) | **$1,000** | **$600** |  | **$91** | **$309** |
| Three-year joint revolving credit facility(2) | **250** | **—** |  | **—** | **250** |
| Total | **$1,250** | **$600** | **(3)** | **$91** | **$559** |

*(1) This credit facility was entered into in September 2010 and terminates in September 2013. This credit facility can be used to support bank borrowings and the issuance of commercial paper, as well as to support up to $1.5 billion (or the sub-limit, whichever is less) of letters of credit. Virginia Power’s current sub-limit under this credit facility can be increased or decreased multiple times per year.*

*(2) This credit facility was entered into in September 2010 and terminates in September 2013. This credit facility can be used to support bank borrowings, commercial paper and letter of credit issuances. Virginia Power’s current sub-limit under this credit facility can be increased or decreased multiple times per year.*

*(3) The weighted-average interest rate of the outstanding commercial paper supported by these credit facilities was 0.41% at December 31, 2010.*

In addition to the credit facility commitments mentioned above, Virginia Power also has a three-year $120 million credit facility that was entered into in September 2010. The facility, which terminates in September 2013, supports certain tax-exempt financings of Virginia Power.

### LONG-TERM DEBT

During 2010, Dominion and Virginia Power issued the following long-term debt:

| Type | Principal (millions) | Rate | Maturity | Issuing Company |
| --- | ---: | ---: | --- | --- |
| Senior notes | **$250** | **2.25%** | **2015** | **Dominion** |
| Senior notes | **300** | **3.45%** | **2022** | **Virginia Power** |
| Total notes issued | **$550** |  |  |  |

In November 2010, Virginia Power borrowed $105 million in connection with the Industrial Development Authority of Wise County Solid Waste and Sewage Disposal Revenue Bonds, Series 2010 A, which mature in 2040 and bear a coupon rate of 2.375% for the first five years, after which they will bear interest at a market rate to be determined at that time, using a remarketing process. The proceeds will be used to finance certain qualifying facilities at the Virginia City Hybrid Energy Center.

In December 2010 and September 2009, Virginia Power borrowed $100 million and $60 million, respectively, in connection with the $160 million Industrial Development Authority of Wise County Solid Waste and Sewage Disposal Revenue Bonds, Series 2009 A, which mature in 2040 and bear interest during the initial period at a variable rate. Due to unfavorable market conditions, Virginia Power acquired the bonds upon issuance with the intention of remarketing them to third parties at a later time. The proceeds will be used to finance certain qualifying facilities at the Virginia City Hybrid Energy Center. At December 31, 2010, these bonds had not been remarketed and thus are not reflected on the Consolidated Balance Sheets.

In December 2010, Virginia Power borrowed $100 million in connection with the Industrial Development Authority of Halifax County, Virginia Recovery Zone Facility Revenue Bonds, Series 2010 A, which mature in 2041 and bear interest at a variable rate for the first seven years, after which they will bear interest at a market rate to be determined at that time, using a remarketing process. The proceeds will be used to finance certain qualifying facilities in Halifax County and/or Wise County.

In December 2010, Brayton Point borrowed approximately $160 million and approximately $75 million in connection with the Massachusetts Development Finance Agency Recovery Zone Facility Bonds, Series 2010 A and the Solid Waste Disposal Revenue Bonds, Series 2010 B, respectively, which mature in 2041 and bear interest during the initial period at a variable rate. Due to unfavorable market conditions, Dominion acquired the bonds upon issuance in December 2010 with the intention of remarketing them to third parties at a later time. The proceeds

will be used to finance certain qualifying facilities at Brayton Point. At December 31, 2010, these bonds had not been remarketed and thus are not reflected on the Consolidated Balance Sheets.

During 2010, Dominion and Virginia Power repaid and repurchased $1.5 billion and $347 million, respectively, of long-term debt and notes payable.

### ISSUANCE OF COMMON STOCK

During 2010, Dominion issued 2.3 million shares of common stock for cash proceeds of $74 million. The shares issued and cash proceeds received during 2010 were through Dominion Direct®, employee savings plans and the exercise of employee stock options. Dominion does not currently plan any market issuances of common stock in 2011 or 2012.

In February 2010, Dominion began purchasing its common stock on the open market with proceeds received through Dominion Direct® and employee savings plans, rather than issuing additional new common shares.

In 2010, Virginia Power issued 33,013 shares of its common stock to Dominion for approximately $1 billion. The proceeds were used to pay down short-term demand note borrowings from Dominion.

### REPURCHASE OF COMMON STOCK

In March 2010, Dominion began repurchasing common shares in anticipation of proceeds from the sale of its Appalachian E&P operations. During 2010, Dominion purchased 21.4 million shares of its common stock for approximately $900 million.

On January 28, 2011, Dominion announced that it intends to repurchase between $400 million and $700 million of common stock with cash tax savings resulting from the extension of the bonus depreciation allowance discussed in Note 6 to the Consolidated Financial Statements. In the first quarter of 2011, Dominion began repurchasing shares on the open market under this program.

### BORROWINGS FROM PARENT

Virginia Power has the ability to borrow funds from Dominion under both short-term and long-term borrowing arrangements and at December 31, 2010, its nonregulated subsidiaries had outstanding borrowings, net of repayments, under the Dominion money pool of $24 million. Virginia Power’s short-term demand note borrowings from Dominion were $79 million at December 31, 2010. There were no long-term borrowings from Dominion at December 31, 2010.

### Credit Ratings

Credit ratings are intended to provide banks and capital market participants with a framework for comparing the credit quality of securities and are not a recommendation to buy, sell or hold securities. Dominion and Virginia Power believe that their current credit ratings provide sufficient access to the capital markets. However, disruptions in the banking and capital markets not specifically related to Dominion and Virginia Power may affect their ability to access these funding sources or cause an increase in the return required by investors. Dominion’s and Virginia Power’s credit ratings may affect their liquidity, cost of borrowing under credit facilities and collateral posting requirements under commodity contracts, as well as the rates at which they are able to offer their debt securities.

Both quantitative (financial strength) and qualitative (business or operating characteristics) factors are considered by the credit rating agencies in establishing an individual company’s credit rating. Credit ratings should be evaluated independently and are subject to revision or withdrawal at any time by the assigning rating organization. The credit ratings for Dominion and Virginia Power are most affected by each company’s financial profile, mix of regulated and nonregulated businesses and respective cash flows, changes in methodologies used by the rating agencies and event risk, if applicable, such as major acquisitions or dispositions.

In January 2010, Fitch lowered its credit ratings for Virginia Power’s preferred stock and Dominion’s junior subordinated debt securities and enhanced junior subordinated notes solely due to a revision in Fitch’s ratings methodology such that it now rates these securities two notches below its credit rating for senior unsecured debt securities. In December 2010, Moody’s raised its credit ratings for Virginia Power, reflecting sustained improvements in Virginia Power’s financial performance as measured by its credit metrics and the agency’s views of a generally supportive regulatory and political environment in Virginia Power’s service territory.

Credit ratings as of February 23, 2011 follow:

|  |  |  |  |
| --- | --- | --- | --- |
|  | Fitch | Moody’s | Standard & Poor’s |
| **Dominion** |  |  |  |
| Senior unsecured debt securities | **BBB+** | **Baa2** | **A-** |
| Junior subordinated debt securities | **BBB-** | **Baa3** | **BBB** |
| Enhanced junior subordinated notes | **BBB-** | **Baa3** | **BBB** |
| Commercial paper | **F2** | **P-2** | **A-2** |
| **Virginia Power** |  |  |  |
| Mortgage bonds | **A** | **A1** | **A** |
| Senior unsecured (including tax-exempt) debt securities | **A-** | **A3** | **A-** |
| Junior subordinated debt securities | **BBB** | **Baa1** | **BBB** |
| Preferred stock | **BBB** | **Baa2** | **BBB** |
| Commercial paper | **F2** | **P-2** | **A-2** |

As of February 23, 2011, Fitch, Moody’s and Standard & Poor’s maintained a stable outlook for their respective ratings of Dominion and Virginia Power.

A downgrade in an individual company’s credit rating would not necessarily restrict its ability to raise short-term and long-term financing as long as its credit rating remains investment grade, but it would likely increase the cost of borrowing. Dominion and Virginia Power work closely with Fitch, Moody’s and Standard & Poor’s with the objective of maintaining their current credit ratings. In order to maintain current ratings, the Companies may find it necessary to modify their business plans and such changes may adversely affect growth and EPS.

### Debt Covenants

As part of borrowing funds and issuing debt (both short-term and long-term) or preferred securities, Dominion and Virginia Power must enter into enabling agreements. These agreements contain covenants that, in the event of default, could result in the acceleration of principal and interest payments; restrictions on distributions related to capital stock, including dividends, redemptions, repurchases, liquidation payments or guarantee payments; and in some cases, the termination of credit commitments unless a waiver of such requirements is agreed to by the

lenders/security holders. These provisions are customary, with each agreement specifying which covenants apply. These provisions are not necessarily unique to Dominion and Virginia Power.

Some of the typical covenants include:

Ÿ The timely payment of principal and interest;

Ÿ Information requirements, including submitting financial reports filed with the SEC and information about changes in Dominion’s and Virginia Power’s credit ratings to lenders;

Ÿ Performance obligations, audits/inspections, continuation of the basic nature of business, restrictions on certain matters related to merger or consolidation, and restrictions on disposition of all or substantially all assets;

Ÿ Compliance with collateral minimums or requirements related to mortgage bonds; and

Ÿ Limitations on liens.

Dominion and Virginia Power are required to pay annual commitment fees to maintain their credit facilities. In addition, their credit agreements contain various terms and conditions that could affect their ability to borrow under these facilities. They include maximum debt to total capital ratios and cross-default provisions.

As of December 31, 2010, the calculated total debt to total capital ratio, pursuant to the terms of the agreements, was as follows:

| Company | Maximum Allowed Ratio | Actual Ratio(1) |
| --- | ---: | ---: |
| Dominion | **65%** | **54%** |
| Virginia Power | **65%** | **46%** |

*(1) Indebtedness as defined by the bank agreements excludes junior subordinated notes reflected as long-term debt as well as AOCI reflected as equity in the Consolidated Balance Sheets.*

These provisions apply separately to Dominion and Virginia Power. If Dominion or Virginia Power or any of either company’s material subsidiaries fails to make payment on various debt obligations in excess of $100 million, the lenders could require that company to accelerate its repayment of any outstanding borrowings under the credit facility and the lenders could terminate their commitment to lend funds to that company. Accordingly, any default by Dominion will not affect the lenders’ commitment to Virginia Power. However, any default by Virginia Power would affect the lenders’ commitment to Dominion under the joint credit agreements.

Dominion executed RCCs in connection with its issuance of the following hybrid securities:

Ÿ June 2006 hybrids;

Ÿ September 2006 hybrids; and

Ÿ June 2009 hybrids.

Under the terms of the RCCs, Dominion covenants to and for the benefit of designated covered debtholders, as may be designated from time to time, that Dominion shall not redeem, repurchase, or defease all or any part of the hybrids, and shall not cause its majority owned subsidiaries to purchase all or any part of the hybrids, on or before their applicable RCC termination date, unless, subject to certain limitations, during the 180 days prior to such activity, Dominion has received a specified amount of proceeds as set forth in the RCCs from the sale of qualifying securities that have equity-like characteristics that are the same as, or more equity-like than the applicable characteristics of the hybrids at that time, as more fully described in the RCCs. The proceeds Dominion receives from the replacement offering, adjusted by a predetermined factor, must equal or exceed the redemption or repurchase price.

At December 31, 2010, the termination dates and covered debt under the RCCs associated with Dominion’s hybrids are as follows:

| Hybrid June 2006 hybrids September 2006 hybrids | RCC Termination Date 6/30/2036 9/30/2036 |  | Designated Covered Debt Under RCC September 2006 hybrids June 2006 hybrids |
| --- | --- | ---: | --- |
| June 2009 hybrids | **6/15/2034** | **(1)** | **2008 Series B Senior Notes, 7.0% due 2038** |

*(1) Automatically extended, as set forth in the RCC, for additional quarterly periods, to the extent the maturity date is extended.*

Dominion and Virginia Power monitor the debt covenants on a regular basis in order to ensure that events of default will not occur. As of December 31, 2010, there have been no events of default under or changes to Dominion’s debt covenants.

### Dividend Restrictions

The Virginia Commission may prohibit any public service company, including Virginia Power, from declaring or paying a dividend to an affiliate if found to be detrimental to the public interest. At December 31, 2010, the Virginia Commission had not restricted the payment of dividends by Virginia Power.

Certain agreements associated with Dominion’s and Virginia Power’s credit facilities contain restrictions on the ratio of debt to total capitalization. These limitations did not restrict Dominion or Virginia Power’s ability to pay dividends or receive dividends from their subsidiaries at December 31, 2010.

See Note 18 to the Consolidated Financial Statements for a description of potential restrictions on dividend payments by Dominion in connection with the deferral of interest payments on junior subordinated notes.

### Future Cash Payments for Contractual Obligations and Planned Capital Expenditures

### CONTRACTUAL OBLIGATIONS

Dominion and Virginia Power are party to numerous contracts and arrangements obligating them to make cash payments in future years. These contracts include financing arrangements such as debt agreements and leases, as well as contracts for the purchase of goods and services and financial derivatives. Presented below is a table summarizing cash payments that may result from contracts to which Dominion and Virginia Power are parties as of December 31, 2010. For purchase obligations and other liabilities, amounts are based upon contract terms, including fixed and minimum quantities to be purchased at fixed or market-based prices. Actual cash payments will be based upon actual quantities purchased and prices paid and will likely differ from amounts presented below. The table excludes all amounts classified as current liabilities in the Consolidated Balance Sheets, other than current maturities of long-term debt, interest payable and certain derivative instruments. The majority of Dominion’s and Virginia Power’s current liabilities will be paid in cash in 2011.

| Dominion (millions) | 2011 | 2012- 2013 | 2014- 2015 | 2016 and thereafter | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Long-term debt(1) | **$497** | **$2,184** | **$1,666** | **$11,882** | **$16,229** |
| Interest payments(2) | **932** | **1,786** | **1,592** | **12,996** | **17,306** |
| Leases(3) | **184** | **312** | **108** | **193** | **797** |
| Purchase obligations(4): |  |  |  |  |  |
| Purchased electric capacity for utility operations | **342** | **698** | **696** | **779** | **2,515** |
| Fuel commitments for utility operations | **959** | **932** | **491** | **241** | **2,623** |
| Fuel commitments for nonregulated operations | **446** | **264** | **198** | **162** | **1,070** |
| Pipeline transportation and storage | **134** | **142** | **49** | **64** | **389** |
| Energy commodity purchases for resale(5) | **495** | **57** | **10** | **76** | **638** |
| Other(6) | **253** | **54** | **12** | **12** | **331** |
| Other long-term liabilities(7): |  |  |  |  |  |
| Financial derivative-commodities(5) | **28** | **49** | **12** | **2** | **91** |
| Other contractual obligations(8) | **5** | **10** | **11** | **1** | **27** |
| Total cash payments | **$4,275** | **$6,488** | **$4,845** | **$26,408** | **$42,016** |

*(1) Based on stated maturity dates rather than the earlier redemption dates that could be elected by instrument holders.*

*(2) Does not reflect Dominion’s ability to defer interest payments on junior subordinated notes.*

#### (3) Primarily consists of operating leases.

*(4) Amounts exclude open purchase orders for services that are provided on demand, the timing of which cannot be determined.*

*(5) Represents the summation of settlement amounts, by contracts, due from Dominion if all physical or financial transactions among its counterparties and Dominion were liquidated and terminated.*

#### (6) Includes capital, operations and maintenance commitments.

*(7) Excludes regulatory liabilities, AROs and employee benefit plan obligations, which are not contractually fixed as to timing and amount. See Notes 13, 15 and 22 to the Consolidated Financial Statements. Due to uncertainty about the timing and amounts that will ultimately be paid, $253 million of income taxes payable associated with unrecognized tax benefits are excluded. Deferred income taxes are also excluded since cash payments are based primarily on taxable income for each discrete fiscal year. See Note 6 to the Consolidated Financial Statements.*

#### (8) Includes interest rate swap agreements.

| Virginia Power (millions) | 2011 | 2012- 2013 | 2014- 2015 | 2016 and thereafter | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Long-term debt(1) | **$15** | **$1,034** | **$236** | **$5,436** | **$6,721** |
| Interest payments | **369** | **721** | **653** | **4,418** | **6,161** |
| Leases(2) | **36** | **45** | **26** | **23** | **130** |
| Purchase obligations(3): |  |  |  |  |  |
| Purchased electric capacity for utility operations | **342** | **698** | **696** | **779** | **2,515** |
| Fuel commitments for utility operations | **959** | **932** | **491** | **241** | **2,623** |
| Transportation and storage | **19** | **29** | **21** | **32** | **101** |
| Other | **113** | **21** | **8** | **8** | **150** |
| Total cash payments(4) | **$1,853** | **$3,480** | **$2,131** | **$10,937** | **$18,401** |

*(1) Based on stated maturity dates rather than the earlier redemption dates that could be elected by instrument holders.*

#### (2) Primarily consists of operating leases.

*(3) Amounts exclude open purchase orders for services that are provided on demand, the timing of which cannot be determined.*

*(4) Excludes regulatory liabilities, AROs and employee benefit plan contributions that are not contractually fixed as to timing and amount. See Notes 13, 15 and 22 to the Consolidated Financial Statements. Due to uncertainty about the timing and amounts that will ultimately be paid, $113 million of income taxes payable associated with unrecognized tax benefits are excluded. Deferred income taxes are also excluded since cash payments are based primarily on taxable income for each discrete fiscal year. See Note 6 to the Consolidated Financial Statements.*

### PLANNED CAPITAL EXPENDITURES

Dominion’s planned capital expenditures are expected to total approximately $3.9 billion, $4.7 billion and $4.4 billion in 2011, 2012 and 2013, respectively. Dominion’s expenditures are expected to include construction and expansion of electric generation and natural gas transmission and storage facilities, environmental upgrades, construction improvements and expansion of electric transmission and distribution assets and purchases of nuclear fuel.

Virginia Power’s planned capital expenditures are expected to total approximately $2.2 billion, $3.0 billion and $3.3 billion in 2011, 2012 and 2013, respectively. Virginia Power’s expenditures are expected to include construction and expansion of electric generation facilities, environmental upgrades, construction improvements and expansion of electric transmission and distribution assets and purchases of nuclear fuel.

Dominion and Virginia Power expect to fund their capital expenditures with cash from operations and a combination of securities issuances and short-term borrowings. Planned capital expenditures include capital projects that are subject to approval by regulators and the Board of Directors.

Based on available generation capacity and current estimates of growth in customer demand, Virginia Power will need additional generation in the future. See *Dominion Generation-Properties* in Item 1. Business for a discussion of Virginia Power’s expansion plans.

These estimates are subject to continuing review and adjustment and actual capital expenditures may vary from these estimates. The Companies may also choose to postpone or cancel certain planned capital expenditures in order to mitigate the need for future debt financings and equity issuances.

### Use of Off-Balance Sheet Arrangements

### GUARANTEES

Dominion primarily enters into guarantee arrangements on behalf of its consolidated subsidiaries. These arrangements are not subject to the provisions of FASB guidance that dictate a guarantor’s accounting and disclosure requirements for guarantees, including indirect guarantees of indebtedness of others.

At December 31, 2010, Dominion had issued $131 million of guarantees, primarily to support equity method investees. No significant amounts related to these guarantees have been recorded. As of December 31, 2010, Dominion’s exposure under these guarantees was $54 million, primarily related to certain reserve requirements associated with non-recourse financing.

### LEASING ARRANGEMENT

Dominion leases Fairless in Pennsylvania, which began commercial operations in June 2004. During construction, Dominion

acted as the construction agent for the lessor, controlled the design and construction of the facility and has since been reimbursed for all project costs ($898 million) advanced to the lessor. Dominion makes annual lease payments of $53 million. The lease expires in 2013 and at that time, Dominion may renew the lease at negotiated amounts based on original project costs and current market conditions, subject to lessor approval; purchase Fairless at its original construction cost plus 51% of any appraised value in excess of original construction cost; or sell Fairless, on behalf of the lessor, to an independent third party. If Fairless is sold and the proceeds from the sale are less than its original construction cost, Dominion would be required to make a payment to the lessor in an amount up to 70.75% of original project costs adjusted for certain other costs as specified in the lease. The lease agreement does not contain any provisions that involve credit rating or stock price trigger events.

Benefits of this arrangement include:

Ÿ Certain tax benefits as Dominion is considered the owner of the leased property for tax purposes. As a result, Dominion is entitled to tax deductions for depreciation not recognized for financial accounting purposes; and

Ÿ As an operating lease for financial accounting purposes, the asset and related borrowings used to finance the construction of the asset are not included in the Consolidated Balance Sheets. Although this improves measures of leverage calculated using amounts reported in the Consolidated Financial Statements, credit rating agencies view lease obligations as debt equivalents in evaluating Dominion’s credit profile.

### FUTURE ISSUES AND OTHER MATTERS

See Item 1. Business, Item 3. Legal Proceedings, and Notes 14 and 23 to the Consolidated Financial Statements for additional information on various environmental, regulatory, legal and other matters that may impact future results of operations and/or financial condition.

### Environmental Matters

Dominion and Virginia Power are subject to costs resulting from a number of federal, state and local laws and regulations designed to protect human health and the environment. These laws and regulations affect future planning and existing operations. They can result in increased capital, operating and other costs as a result of compliance, remediation, containment and monitoring obligations.

### ENVIRONMENTAL PROTECTION AND MONITORING EXPENDITURES

Dominion incurred approximately $228 million, $252 million and $205 million of expenses (including depreciation) during 2010, 2009, and 2008 respectively, in connection with environmental protection and monitoring activities and expects these expenses to be approximately $231 million and $251 million in 2011 and 2012, respectively. In addition, capital expenditures related to environmental controls were $351 million, $266 million, and $254 million for 2010, 2009 and 2008, respectively. These expenditures are expected to be approximately $398 million and $553 million for 2011 and 2012, respectively.

Virginia Power incurred approximately $144 million, $134 million and $125 million of expenses (including depreciation) during 2010, 2009 and 2008, respectively, in connection with environmental protection and monitoring activities and expects these expenses to be approximately $142 million and $156 million in 2011 and 2012, respectively. In addition, capital expenditures related to environmental controls were $101 million, $109 million and $116 million for 2010, 2009 and 2008, respectively. These expenditures are expected to be approximately $72 million and $341 million for 2011 and 2012, respectively.

### FUTURE ENVIRONMENTAL REGULATIONS

There have already been federal and state legislative proposals and regulatory action regarding the regulation of GHG emissions. Dominion and Virginia Power expect that there may be federal legislation and/or regulatory action regarding compliance with more stringent air emission standards, regarding coal combustion by-products, and regarding regulation of cooling water intake structures and discharges in the future. With respect to GHG emissions, in December 2010, the EPA announced a schedule for when they will propose regulations which would establish GHG performance standards for new, modified and existing fossil-fired electric generating units. Regulations are expected to be proposed by July 2011 and finalized by May 2012. This means that Dominion’s new, modified, and existing fossil-fired electric generating units will become subject to GHG performance standards, if these rules are finalized. The EPA has not provided any detail yet on what the performance standard might be or what measures facilities might have to make to reach the standard. With respect to emission reductions of SO2, NOx, mercury and HAPs (in addition to mercury), specific requirements will depend on the following:

Ÿ Final outcome of the EPA’s scheduled rulemaking for developing MACT standards for mercury and other HAPs to replace the CAMR vacated by a federal court in 2008;

Ÿ The final outcome of the EPA’s Transport Rule proposed in July 2010 in response to a federal court remand of the CAIR as well as future state regulations implementing requirements to address the EPA’s promulgation of revised NAAQS for SO2 and NO2; and

Ÿ EPA’s impending rulemaking to revise the ozone NAAQS.

With respect to cooling water intakes and discharges, the Companies expect future federal regulation on cooling water intake structures and the quality of water discharges, and more focus by the EPA and state regulatory authorities on thermal discharge issues. With respect to coal combustion by-products, Dominion and Virginia Power expect federal regulation of coal combustion by-product handling and disposal practices. If any of these new proposals are adopted, additional significant expenditures may be required.

### Dodd-Frank Act

The Dodd-Frank Act was enacted into law in July 2010 in an effort to improve regulation of financial markets. The Dodd-Frank Act includes provisions that will require certain over-the-counter derivatives, or swaps, to be centrally cleared and executed through an exchange or other approved trading platform. Non-financial entities that use swaps to hedge or mitigate commercial risk, often referred to as end users, can be exempted from these clearing and exchange trading requirements. In addi-

tion, the Dodd-Frank Act allows the CFTC and SEC to impose initial and variation margin requirements on entities who execute swaps. End users were not expressly exempt from these requirements for non-cleared swaps; however, key legislators indicated in a public letter that it was their intention to exclude commercial hedging transactions by end users from these requirements. Final rules for the over-the-counter derivative-related provisions of the Dodd-Frank Act, including the clearing, exchange trading and margin requirements, will be established through the CFTC’s and SEC’s rulemaking process, which is required to be completed by July 2011. If, as a result of the rulemaking process, Dominion’s or Virginia Power’s derivative activities are not exempted from the clearing, exchange trading or margin requirements, the Companies could be subject to higher costs for their derivative activities, including from higher margin requirements. In addition, implementation of, and compliance with, the over-the-counter derivative provisions of the Dodd-Frank Act by the Companies’ swap counterparties could result in increased costs related to the Companies’ derivative activities. Due to the ongoing rulemaking process, the Companies are currently unable to assess the potential impact of the Dodd-Frank Act’s derivative-related provisions on their financial condition, results of operations or cash flows.

## Market risk

As filed, 9,218 characters.

The matters discussed in this Item may contain “forward-looking statements” as described in the introductory paragraphs of Item 7. MD&A. The reader’s attention is directed to those paragraphs and Item 1A. Risk Factors for discussion of various risks and uncertainties that may impact Dominion and Virginia Power.

### MARKET RISK SENSITIVE INSTRUMENTS AND RISK MANAGEMENT

Dominion’s and Virginia Power’s financial instruments, commodity contracts and related financial derivative instruments are exposed to potential losses due to adverse changes in commodity prices, interest rates and equity security prices as described below. Commodity price risk is present in Dominion’s and Virginia Power’s electric operations, Dominion’s gas procurement operations, and Dominion’s energy marketing and trading operations due to the exposure to market shifts in prices received and paid for electricity, natural gas and other commodities. The Companies use commodity derivative contracts to manage price risk exposures for these operations. Interest rate risk is generally related to their outstanding debt. In addition, they are exposed to investment price risk through various portfolios of equity and debt securities.

The following sensitivity analysis estimates the potential loss of future earnings or fair value from market risk sensitive instruments over a selected time period due to a 10% unfavorable change in commodity prices or interest rates.

### Commodity Price Risk

To manage price risk, Dominion and Virginia Power primarily hold commodity-based financial derivative instruments held for non-trading purposes associated with purchases and sales of elec- tricity, natural gas and other energy-related products. As part of its strategy to market energy and to manage related risks, Dominion also holds commodity-based financial derivative instruments for trading purposes.

The derivatives used to manage commodity price risk are executed within established policies and procedures and may include instruments such as futures, forwards, swaps, options and FTRs that are sensitive to changes in the related commodity prices. For sensitivity analysis purposes, the hypothetical change in market prices of commodity-based financial derivative instruments is determined based on models that consider the market prices of commodities in future periods, the volatility of the market prices in each period, as well as the time value factors of the derivative instruments. Prices and volatility are principally determined based on observable market prices.

A hypothetical 10% unfavorable change in market prices of Dominion’s non-trading commodity-based financial derivative instruments would have resulted in a decrease in fair value of approximately $183 million and $150 million as of December 31, 2010 and 2009, respectively. A hypothetical 10% unfavorable change in commodity prices would have resulted in a decrease of approximately $5 million and $11 million in the fair value of Dominion’s commodity-based financial derivative instruments held for trading purposes as of December 31, 2010 and 2009, respectively.

A hypothetical 10% unfavorable change in commodity prices would not have resulted in a material change in the fair value of Virginia Power’s non-trading commodity-based financial derivatives as of December 31, 2010 or 2009.

The impact of a change in energy commodity prices on Dominion’s and Virginia Power’s non-trading commodity-based financial derivative instruments at a point in time is not necessarily representative of the results that will be realized when the contracts are ultimately settled. Net losses from commodity derivative instruments used for hedging purposes, to the extent realized, will generally be offset by recognition of the hedged transaction, such as revenue from physical sales of the commodity.

### Interest Rate Risk

Dominion and Virginia Power manage their interest rate risk exposure predominantly by maintaining a balance of fixed and variable rate debt. They also enter into interest rate sensitive derivatives, including interest rate swaps and interest rate lock agreements. For financial instruments designated under fair value hedging and outstanding for Dominion and Virginia Power, a hypothetical 10% increase in market interest rates would not have resulted in a material change in annual earnings at December 31, 2010 or 2009.

Dominion and Virginia Power may also use forward-starting interest rate swaps and interest rate lock agreements as anticipatory hedges. At December 31, 2009, Dominion and Virginia Power had $1.7 billion and $850 million, respectively, in aggregate notional amounts of these interest rate derivatives outstanding. At December 31, 2009, a hypothetical 10% decrease in market interest rates would have resulted in a decrease of approximately $62 million and $33 million in the fair value of these interest rate derivatives held by Dominion and Virginia Power, respectively. Subsequent to June 30, 2010, all forward-starting

interest rate swap contracts were terminated; therefore, Dominion and Virginia Power have no sensitivity to changes in interest rates related to these interest rate swaps.

The impact of a change in market interest rates on these anticipatory hedges at a point in time is not necessarily representative of the results that will be realized when such contracts are settled. Net gains and/or losses from interest rate derivatives used for anticipatory hedging purposes, to the extent realized, will generally be amortized over the life of the respective debt issuance being hedged.

### Investment Price Risk

Dominion and Virginia Power are subject to investment price risk due to securities held as investments in decommissioning and rabbi trust funds that are managed by third-party investment managers. These trust funds primarily hold marketable securities that are reported in the Consolidated Balance Sheets at fair value.

Dominion recognized net realized gains (including investment income) on nuclear decommissioning and rabbi trust investments of $95 million and $25 million in 2010 and 2009, respectively. Net realized gains and losses include gains and losses from the sale of investments as well as any other-than-temporary declines in fair value. In 2010 and 2009, Dominion recorded, in AOCI and regulatory liabilities, a net increase in unrealized gains on these investments of $182 million and $360 million, respectively.

Virginia Power recognized net realized gains (including investment income) on nuclear decommissioning trust investments of $44 million in 2010. Virginia Power recognized net realized losses (net of investment income) on nuclear decommissioning trust investments of $3 million in 2009. Net realized gains and losses include gains and losses from the sale of investments as well as any other-than-temporary declines in fair value. In 2010 and 2009, Virginia Power recorded, in AOCI and regulatory liabilities, a net increase in unrealized gains on these investments of $67 million and $149 million, respectively.

Dominion sponsors pension and other postretirement benefit plans that hold investments in trusts to fund employee benefit payments. Virginia Power employees participate in these plans. Aggregate actual returns for Dominion’s pension and other postretirement plan assets were $624 million in 2010 and $777 million in 2009, versus expected returns of $479 million and $462 million, respectively. Differences between actual and expected returns on plan assets are accumulated and amortized during future periods. As such, any investment-related declines in these trusts will result in future increases in the periodic cost recognized for employee benefit plans and will be included in the determination of the amount of cash to be contributed to the employee benefit plans. As of December 31, 2010 and 2009, a hypothetical 0.25% decrease in the assumed long-term rates of return on Dominion’s plan assets would result in an increase in net periodic cost of approximately $13 million for pension benefits and $3 million for other postretirement benefits.

### Risk Management Policies

Dominion and Virginia Power have established operating procedures with corporate management to ensure that proper internal controls are maintained. In addition, Dominion has established an independent function at the corporate level to monitor compliance with the credit and commodity risk management policies of all subsidiaries, including Virginia Power. Dominion maintains credit policies that include the evaluation of a prospective counterparty’s financial condition, collateral requirements where deemed necessary and the use of standardized agreements that facilitate the netting of cash flows associated with a single counterparty. In addition, Dominion also monitors the financial condition of existing counterparties on an ongoing basis. Based on these credit policies and Dominion’s and Virginia Power’s December 31, 2010 provision for credit losses, management believes that it is unlikely that a material adverse effect on Dominion’s or Virginia Power’s financial position, results of operations or cash flows would occur as a result of counterparty nonperformance.

## Controls and procedures

As filed, 11,686 characters.

### DOMINION

Senior management, including Dominion’s CEO and CFO, evaluated the effectiveness of Dominion’s disclosure controls and procedures as of the end of the period covered by this report. Based on this evaluation process, Dominion’s CEO and CFO have concluded that Dominion’s disclosure controls and procedures are effective. There were no changes in Dominion’s internal control over financial reporting that occurred during the last fiscal quarter that have materially affected, or are reasonably likely to materially affect, Dominion’s internal control over financial reporting.

### MANAGEMENT’S ANNUAL REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

Management of Dominion Resources, Inc. (Dominion) understands and accepts responsibility for Dominion’s financial statements and related disclosures and the effectiveness of internal control over financial reporting (internal control). Dominion continuously strives to identify opportunities to enhance the effectiveness and efficiency of internal control, just as Dominion does throughout all aspects of its business.

Dominion maintains a system of internal control designed to provide reasonable assurance, at a reasonable cost, that its assets are safeguarded against loss from unauthorized use or disposition and that transactions are executed and recorded in accordance with established procedures. This system includes written policies, an organizational structure designed to ensure appropriate segregation of responsibilities, careful selection and training of qualified personnel and internal audits.

The Audit Committee of the Board of Directors of Dominion, composed entirely of independent directors, meets periodically with the independent registered public accounting firm, the internal auditors and management to discuss auditing, internal control, and financial reporting matters of Dominion and to ensure that each is properly discharging its responsibilities. Both the independent registered public accounting firm and the internal auditors periodically meet alone with the Audit Committee and have free access to the Committee at any time.

SEC rules implementing Section 404 of the Sarbanes-Oxley Act of 2002 require Dominion’s 2010 Annual Report to contain a management’s report and a report of the independent registered public accounting firm regarding the effectiveness of internal control. As a basis for the report, Dominion tested and evaluated the design and operating effectiveness of internal controls. Based on its assessment as of December 31, 2010, Dominion makes the following assertion:

Management is responsible for establishing and maintaining effective internal control over financial reporting of Dominion.

There are inherent limitations in the effectiveness of any internal control, including the possibility of human error and the circumvention or overriding of controls. Accordingly, even effective internal controls can provide only reasonable assurance with respect to financial statement preparation. Further, because of changes in conditions, the effectiveness of internal control may vary over time.

Management evaluated Dominion’s internal control over financial reporting as of December 31, 2010. This assessment was based on criteria for effective internal control over financial reporting described in *Internal Control-Integrated Framework* issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, Management believes that Dominion maintained effective internal control over financial reporting as of December 31, 2010.

Dominion’s independent registered public accounting firm is engaged to express an opinion on Dominion’s internal control over financial reporting, as stated in their report which is included herein.

### REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholders of

Richmond, Virginia

We have audited the internal control over financial reporting of Dominion Resources, Inc. and subsidiaries (“Dominion”) as of December 31, 2010, based on criteria established in *Internal Control—Integrated Framework* issued by the Committee of Sponsoring Organizations of the Treadway Commission. Dominion’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management’s Annual Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on Dominion’s internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

A company’s internal control over financial reporting is a process designed by, or under the supervision of, the company’s principal executive and principal financial officers, or persons performing similar functions, and effected by the company’s board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes

in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, Dominion maintained, in all material respects, effective internal control over financial reporting as of December 31, 2010, based on the criteria established in *Internal Control—Integrated Framework* issued by the Committee of Sponsoring Organizations of the Treadway Commission.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated financial statements as of and for the year ended December 31, 2010 of Dominion and our report dated February 25, 2011, expressed an unqualified opinion on those financial statements.

/s/ Deloitte & Touche LLP

Richmond, Virginia

### VIRGINIA POWER

Senior management, including Virginia Power’s CEO and CFO, evaluated the effectiveness of Virginia Power’s disclosure controls and procedures as of the end of the period covered by this report. Based on this evaluation process, Virginia Power’s CEO and CFO have concluded that Virginia Power’s disclosure controls and procedures are effective. There were no changes in Virginia Power’s internal control over financial reporting that occurred during the last fiscal quarter that have materially affected, or are reasonably likely to materially affect, Virginia Power’s internal control over financial reporting.

### MANAGEMENT’S ANNUAL REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

Management of Virginia Electric and Power Company (Virginia Power) understands and accepts responsibility for Virginia Power’s financial statements and related disclosures and the effectiveness of internal control over financial reporting (internal control). Virginia Power continuously strives to identify opportunities to enhance the effectiveness and efficiency of internal control, just as it does throughout all aspects of its business.

Virginia Power maintains a system of internal control designed to provide reasonable assurance, at a reasonable cost, that its assets are safeguarded against loss from unauthorized use or disposition and that transactions are executed and recorded in accordance with established procedures. This system includes written policies, an organizational structure designed to ensure appropriate segregation of responsibilities, careful selection and training of qualified personnel and internal audits.

The Board of Directors also serves as Virginia Power’s Audit Committee and meets periodically with the independent registered public accounting firm, the internal auditors and management to discuss Virginia Power’s auditing, internal accounting control and financial reporting matters and to ensure that each is properly discharging its responsibilities.

SEC rules implementing Section 404 of the Sarbanes-Oxley Act require Virginia Power’s 2010 Annual Report to contain a management’s report regarding the effectiveness of internal control. As a basis for the report, Virginia Power tested and evaluated the design and operating effectiveness of internal controls. Based on the assessment as of December 31, 2010, Virginia Power makes the following assertion:

Management is responsible for establishing and maintaining effective internal control over financial reporting of Virginia Power.

There are inherent limitations in the effectiveness of any internal control, including the possibility of human error and the circumvention or overriding of controls. Accordingly, even effective internal controls can provide only reasonable assurance with respect to financial statement preparation. Further, because of changes in conditions, the effectiveness of internal control may vary over time.

Management evaluated Virginia Power’s internal control over financial reporting as of December 31, 2010. This assessment was based on criteria for effective internal control over financial reporting described in *Internal Control-Integrated Framework* issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, Management believes that Virginia Power maintained effective internal control over financial reporting as of December 31, 2010.

This annual report does not include an attestation report of Virginia Power’s registered public accounting firm regarding internal control over financial reporting. Management’s report is not subject to attestation by Virginia Power’s independent registered public accounting firm pursuant to a permanent exemption under the Dodd-Frank Act.

Filed Feb 28, 2011.