# Public Service Enterprise Group Inc: Form 10-Q for the period ended Jun 30, 2011

- Company: [Public Service Enterprise Group Inc](/companies/peg.md) (CIK 788784)
- Form: 10-Q
- Filed: 2011-08-03
- Accepted by EDGAR: Aug 3, 2011, 19:37 ET
- Period: 2011-06-30
- Accession: 0001193125-11-208082
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/788784/000119312511208082/d10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/788784/000119312511208082/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2011-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2011-04-01 to 2011-06-30 | $2.47bn | us-gaap:Revenues |
| Revenue | 6 months, 2011-01-01 to 2011-06-30 | $5.82bn | us-gaap:Revenues |
| Operating income | 3 months, 2011-04-01 to 2011-06-30 | $621.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2011-01-01 to 2011-06-30 | $1.48bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2011-04-01 to 2011-06-30 | $117.0m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2011-01-01 to 2011-06-30 | $244.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2011-04-01 to 2011-06-30 | $227.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2011-01-01 to 2011-06-30 | $556.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2011-04-01 to 2011-06-30 | $323.0m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2011-01-01 to 2011-06-30 | $849.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2011-04-01 to 2011-06-30 | $0.63 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2011-01-01 to 2011-06-30 | $1.67 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2011-04-01 to 2011-06-30 | $0.63 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2011-01-01 to 2011-06-30 | $1.68 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2011-04-01 to 2011-06-30 | 506,761,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2011-01-01 to 2011-06-30 | 506,945,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2011-01-01 to 2011-06-30 | $1.40bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months, 2011-01-01 to 2011-06-30 | $1.00bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2011-04-01 to 2011-06-30 | $173.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Dividends paid | 6 months, 2011-01-01 to 2011-06-30 | $347.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2011-06-30 | $159.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2011-06-30 | $3.79bn | us-gaap:AssetsCurrent |
| Total assets | at 2011-06-30 | $28.79bn | us-gaap:Assets |
| Current liabilities | at 2011-06-30 | $3.53bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2011-06-30 | $7.06bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2011-06-30 | $976.0m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2011-06-30 | $298.0m | us-gaap:CommercialPaper |
| Shareholders' equity | at 2011-06-30 | $10.11bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 61,397 characters.

This combined MD&A is separately filed by PSEG, Power and PSE&G. Information contained herein relating to any individual company is filed by such company on its own behalf. Power and PSE&G each make representations only as to itself and make no representations whatsoever as to any other company.

PSEG’s business consists of three reportable segments, which are:

- **Power,** our wholesale energy supply company that integrates its generating asset operations with its wholesale energy, fuel supply, energy trading and marketing and risk management activities primarily in the Northeast and Mid Atlantic United States,
- **PSE&G,** our public utility company which provides transmission and distribution of electric energy and gas in New Jersey; implements demand response and energy efficiency programs and invests in solar generation, and
- **Energy Holdings,** which owns our energy-related leveraged leases and other investments.

Our discussion in Part I, Item 1. Business of our 2010 Annual Report on Form 10-K provides a review of the regions and markets where we operate and compete, as well as our strategy for conducting our businesses within these markets. Our risk factors section in Part II Item 1A provides information about factors that could have a material adverse impact on our businesses. The following supplements that discussion and the discussion included in the Overview of 2010 and Future Outlook provided in Item 7 in our Form 10-K by describing significant events and business developments that have occurred during 2011 and any changes to the key factors that we expect may drive our future performance. The following discussion refers to the Condensed Consolidated Financial Statements (Statements) and the Related Notes to Condensed Consolidated Financial Statements (Notes). This information should be read in conjunction with such Statements, Notes and the 2010 Annual Report on Form 10-K.

### OVERVIEW OF 2011 AND FUTURE OUTLOOK

During the first half of 2011, we continued to be impacted by lower pricing at Power. We began experiencing a greater pricing impact due to a significant decline in both PJM Reliability Pricing Model (RPM) and Basic Generation Service (BGS) rates which became effective in the second quarter. Our pricing also continues to be impacted by customer migration away from our BGS supply contracts as these volumes are replaced with lower priced spot market sales. However, the impact of migration on our results has been reduced as average BGS rates decline to a level more closely resembling current market prices so that customers also have less incentive to choose third party suppliers.

Partially offsetting this lower pricing at Power are higher distribution rates at PSE&G as a result of the base rate case settlement in mid-2010. This included an increase of $73.5 million and $26.5 million in annual electric and gas revenues, respectively, with a return on equity (ROE) of 10.3%. We have also realized an increase in transmission revenues as a result of our 2011 Formula Rate Update which provides for approximately $45 million in increased revenues in our 2011 transmission rates effective January 1, 2011.

In addition, our gas sales volumes improved for the first half of 2011 compared to the same period in 2010, due primarily to much warmer winter weather last year. Heating degree days, as a measure of winter weather in 2011, were 8% higher than in 2010. The gas weather normalization clause, which was implemented effective with the base rate case settlement last year, added $7 million to margin due to the fact that heating degree days were 2% below normal in 2011. The weather, the economy and other factors all contributed to an overall increase of approximately 4% in Power’s Basic Gas Supply Service (BGSS) sales volumes and PSE&G’s gas delivery volumes as compared to 2010.

For 2011 and beyond, the key issues our business will confront are:

- potential for sustained lower natural gas and electricity prices,
- uncertainty in the economic recovery,
- regulatory and political uncertainty, particularly around energy policy and environmental regulation, and
- pressure on competitive markets in many states, including New Jersey.

Our future success will also depend on our ability to respond to these challenges and take advantage of opportunities presented by these and other regulatory and legislative initiatives. In order to do this, we must:

- focus on controlling costs while maintaining our safety, reliability and compliance standards,
- successfully recontract open positions, and
- execute our capital investment program, including continued investments for growth that yield contemporaneous returns.

There have also been other significant regulatory and legislative developments during the year which may affect our operations in the future as new rules and regulations are adopted. For additional information on these issues, see Part II, Item 5. Other Information.

- In an attempt to stimulate the development of new generation capacity in New Jersey through a subsidized rate mechanism, in January 2011, New Jersey enacted the long-term capacity agreement pilot program Act (LCAPP) directing the New Jersey Board of Public Utilities (BPU) to conduct a process to procure and subsidize up to 2,000 megawatts of baseload or mid-merit electric power generation. This could result in artificially depressed pricing in the competitive wholesale market and thus has the potential to harm competitive markets, on both a short-term and a long-term basis. In March 2011, the BPU issued a written order approving a form of agreement and selecting three generators to build a total of 1,949 MW of new combined-cycle generating facilities located in New Jersey. Power and PSE&G appealed this order. Each of the New Jersey electric distribution companies (EDCs), including PSE&G, executed standard offer capacity agreements (SOCA) with the three generators in compliance with the BPU’s directive, but did so under protest reserving its legal rights. On April 27, 2011, the BPU approved the executed contracts and also announced its intent to convene a proceeding to consider whether current mechanisms are adequate to incent generation construction in New Jersey. The BPU has commenced such a proceeding to consider whether there is a need for additional procurements of up to 1,600 MW of new generation. Power and PSE&G are participating in this proceeding, which calls for recommendations to be made to the BPU by the end of 2011.

The SOCA requires that the generator bid in and clear the PJM RPM base residual auction in each year of the SOCA term. The SOCA provides for each New Jersey EDC to make capacity payments to, or receive capacity payments from, the generators as calculated based on the difference between the RPM clearing price for each year of the term and the price bid and accepted for that generator in the BPU process. In April 2011, the Federal Energy Regulatory Commission (FERC) issued an order making effective changes to the PJM Tariff that would require new generation to clear in the RPM at competitive prices which would mitigate the impacts of the subsidized SOCA pricing upon RPM auction prices. This order has been challenged on rehearing. In addition, FERC convened a technical conference on July 29, 2011 to consider whether resources that engage in self-supply should be exempt from such requirements.

The various court challenges which we and other parties made relating to LCAPP legislation are currently pending.

- The United States Environmental Protection Agency (EPA) published a proposed rule in April 2011 related to 316(b) Clean Water Act requirements. The proposed rule would establish a separate marine life entrainment mortality standard as well as new impingement mortality standards for certain existing cooling water intake structures. We are unable to predict the outcome of this proposed rulemaking, the final form that the proposed regulations may take or the effect, if any, that they may have on our future capital requirements, financial condition or results of operations which could be material. If the rule were to be adopted as proposed, the impact would be material since the majority of our electric generating facilities would be affected as they employ once-through cooling utilizing tidal river and tidal waters.
- On July 6, 2011, the EPA issued the Cross-State Air Pollution Rule (CSAPR). CSAPR limits power plant emissions in 27 states that contribute to the ability of downwind states to attain and/or maintain current particulate matter and ozone emission standards. Emission reductions will be governed by this rule beginning on January 1, 2012 for SO2 and “annual NOx” and May 1, 2012 for “Ozone season NOx”. Certain states will be required to make additional SO2 reductions in 2014.

We continue to evaluate the impact of this rule on us due to many of the uncertainties that still exist regarding implementation; however, considering the significant investments we have made over the past several years to lower the SO2 and NOx emissions of our fossil plants in the states affected by CSAPR (New Jersey, New York and Pennsylvania), we do not foresee the need to make any significant capital expenditures to our generation fleet to comply with the regulation. As such, we believe this rule will not have a material impact to our financial condition or operations.

- As a result of events at the Fukushima Daiichi nuclear facility in Japan following the earthquake and tsunami in March 2011, the NRC will be performing additional operational and safety reviews of nuclear facilities in the United States. These reviews and the lessons learned from the events in Japan may result in additional regulation for the nuclear industry and could impact future operations and capital requirements for our facilities. We believe that our nuclear plants meet the stringent applicable design and safety specifications of the NRC.

Separately, a petition was filed with the NRC in April 2011 seeking suspension of the operating licenses of all General Electric boiling water reactors utilizing the Mark 1 containment design in the United States, including our Hope Creek and Peach Bottom units, pending completion of the NRC review. The petition names 23 of the total 104 active commercial nuclear reactors in the United States. While we do not believe the petition will be successful, we are unable to predict the outcome of any action that the NRC may take in connection with its operational and safety reviews or any other regulatory or industry responses to the events in Japan.

In July 2011, the NRC task force submitted a report on the first 90 days of its nuclear power plant review. The report contained various recommendations to ensure plant protection, enhance accident mitigation, strengthen emergency preparedness and improve NRC program efficiency. These recommendations include proposed requirements for upgraded seismic and flooding protection, strengthening plants’ ability to deal with prolonged loss of power and development of emergency plans for events involving multiple reactors. The NRC Chairman has indicated that the NRC should provide “clear direction” within 90 days which could include interim steps on the issues identified or commencing the process for longer-term rulemakings.

We received our requested 20-year license extensions for the Salem and Hope Creek facilities in June and July 2011, respectively. Salem Units 1 and 2 are now licensed through 2036 and 2040, respectively, and Hope Creek is now licensed through 2046.

- During 2011, the SEC and the Commodity Futures Trading Commission (CFTC) are continuing efforts to implement new rules to enact stricter regulation over swaps and derivatives. CFTC has issued Notices of Proposed Rulemakings (NOPRs) on many of the key issues. We cannot assess the exact scope of the new rules until they are issued by the SEC and CFTC. We will carefully monitor these new rules as they are developed to analyze the potential impact on our swap and derivatives transactions, including any potential increase in our collateral requirements.
- In June, the BPU issued a new draft Energy Master Plan (EMP). We are currently analyzing the potential impacts of the draft EMP on our businesses. Our initial assessment is that if the EMP were finalized with the same provisions as drafted, it is generally favorable to our utility business direction, supportive of solar, nuclear power and off-shore wind development, but represents a serious threat to the PJM competitive electric wholesale market in that as a matter of policy it directs the BPU to subsidize new natural gas fired combined cycle generation in an effort to suppress wholesale market prices. The final EMP is expected to be issued later this year, following BPU hearings, in which we intend to participate.
- On July 21, 2011, the FERC issued a Final Rule which, among other things (i) directs regional planners such as PJM to modify their planning processes to “consider transmission needs driven by public policy requirements established by state or federal laws or regulations” (i.e. creating a new category of “public policy” transmission projects in addition to reliability and economic projects), (ii) directs these regional planners to remove the Right of First Refusal (ROFR)—which permits incumbent transmission owners such as PSE&G the first opportunity to construct transmission within their respective service territories—from its tariffs and agreements, subject to certain exceptions, and (iii) requires regional planners to allocate costs for transmission projects in a way that roughly matches costs with benefits, while leaving flexibility to the regions to determine precise cost allocation methodologies. We cannot predict the final outcome or impact on us, however, specific implementation of the Final Rule in the various regions, including within PSE&G’s service territory, may expose us to competition for construction of transmission, additional regulatory considerations and potential delay with respect to future transmission projects.

### Operational Excellence

Our generating stations continued to operate well in 2011. Generation volumes for the first six months of 2011 were approximately 4% lower than in the first half of 2010, primarily at our coal facilities, due to reduced demands.

In addition, we continued to demonstrate our commitment to system reliability by limiting customer outages. In February 2011, our service territory experienced winter storms that impacted the electric transmission and distribution systems due to heavy icing and salt spray and in March 2011, our northern gas service territory was impacted by two heavy rainstorms that resulted in widespread flooding. Our personnel were prepared in each case for widespread outages and, as a result, were able to minimize the length of time our customers were without electric or gas service.

### Financial Strength

Our cash from operations has remained strong. During the first six months of 2011, we made approximately $1 billion in capital expenditures, paid dividends of $347 million and made our entire planned pension contributions for the year 2011 of $415 million. Cash from operations for the year has and is expected to continue to benefit from two tax provisions enacted in 2010 which are expected to generate a total of approximately $800 million of cash benefits for us through accelerated depreciation, most of which is expected to be realized in 2011. See Note 13. Income Taxes for additional information. These funds, combined with proceeds from the sales of our Texas facilities, will be used to support our anticipated capital expenditures and dividend payments for the year.

In April 2011, PSEG, Power and PSE&G entered into new 5-year credit agreements resulting in an increase of $650 million in Power’s total credit capacity and increasing our total credit capacity to $4.3 billion.

### Disciplined Investment

We seek to invest in areas that complement our existing businesses and provide attractive risk-adjusted returns. These areas include upgrading critical energy infrastructure, responding to trends in environmental protection and providing new energy supplies in markets with growing demand. We also have several projects where we are investing to continue to improve our operational performance.

- During 2011, we reached agreements to sell our two 1,000 MW combined-cycle generating facilities in Texas in separate transactions for a total of approximately $687 million. In March 2011, we completed the sale of one plant for $352 million. The sale of the second plant closed in July 2011 for approximately $335 million. See Note 4. Discontinued Operations and Dispositions for further information.
- We are continuing to pursue obtaining the necessary regulatory approvals for the Susquehanna-Roseland transmission project but have incurred delays in obtaining environmental approvals which have resulted in a delay to the project implementation date. The estimated cost of construction is up to $750 million for this project. In October 2010, the PJM Board approved the North East Grid project, specifically a 230 kV project running from Roseland to Hudson. This project has an expected

in-service date of June 2015 with an estimated cost of construction of up to $880 million. We have also filed for BPU approval of the North-Central Reliability project, a 230 kV upgrade project located in the northern and central portions of New Jersey with an estimated cost of construction of approximately $336 million. The North-Central Reliability project has an expected in-service date of June 2014. Delays in the construction schedules of these projects could impact the timing of expected transmission revenues.

- In April 2011, we filed a petition with FERC seeking incentive rates with an effective date of June 14, 2011 for five 230 kV transmission projects. In June 2011, FERC granted incentive rates for three of these 230 kV projects, with a total capital investment of approximately $1.0 billion, representing approximately 80% of our request. The incentive rates include recovery for Construction Work in Progress and 100% recovery of prudently-incurred abandonment costs. See Item 5. Other Information, Federal Regulation, Transmission Regulation—Transmission Expansion for further information.
- Our utility has made additional investments in solar initiatives. Under our solar loan program we have provided a total of $93 million in loans for 317 projects as of June 30, 2011, representing 26 MW to date. Under our Solar 4 All program we have made total program expenditures of approximately $278 million as of June 30, 2011. Over 21 MW of solar panels have been installed on distribution poles and another 23 MW representing 15 projects have been placed into service. Additional projects are in various stages of negotiation and development. Our total anticipated expenditures to develop all approved 80 MW is approximately $465 million. The BPU has commenced a generic stakeholder proceeding, however, to examine whether utility rate-based solar programs should be modified, expanded or terminated in the future.
- We made additional expenditures under our Capital Economic Stimulus and Energy Efficiency Economic Stimulus programs. As of June 30, 2011, total capital expenditures since inception of these projects were $701 million and $118 million, respectively. In July, the BPU approved extensions to both of these programs which provide for approximately $273 million in accelerated capital investments in our electric and gas infrastructure through 2012 and $95 million of additional capital expenditures for energy efficiency programs. In conjunction with the extension of the Capital Economic Stimulus programs, we agreed to additional electric and gas “base” spending of approximately $96 million during the program.
- We continued various construction activities at Power, including a steam path retrofit and extended power uprate at Peach Bottom and construction of new gas fired peaking units at Kearny and in Connecticut (see Note 8. Commitments and Contingent Liabilities for additional information). This additional capacity at Kearny was bid into and has cleared the RPM capacity auction, and the additional capacity in Connecticut is subject to a contract with a Connecticut utility.
- We are continuing our efforts to obtain an Early Site Permit for a new nuclear generating station to be located at the current site of Salem and Hope Creek stations.

There is no guarantee that the projects described above or any future initiatives will be achieved since many issues need to be favorably resolved, such as regulatory approvals.

Our leveraged lease investments face risks with regard to the creditworthiness of the various counterparties. Relative to the assets subject to lease to Dynegy Inc. (Dynegy), our lease collateral includes a guarantee from Dynegy Holdings Incorporated (DHI), a subsidiary of Dynegy Inc. DHI holds other generation assets that we believe were intended to support DHI’s guarantee obligations to us. Recently, management of Dynegy announced a plan to reorganize and recapitalize the legal entity structure for their generation assets. Under their plan, they would transfer substantially all of their coal and natural gas-fired generation assets, other than the Roseton and Danskammer facilities, to new “bankruptcy remote” subsidiaries. Following the announcement of this plan, in July 2011, Moody’s lowered certain ratings of Dynegy and DHI.

Subsidiaries of Energy Holdings that hold our lessor interests filed a lawsuit in Delaware Chancery Court against DHI to halt DHI’s proposed transfer of assets to two bankruptcy remote entities as part of a reorganization. In our complaint, we alleged that we believe that DHI’s proposed transfers violate DHI’s obligations under its Roseton and Danskammer guarantees. Our request for a temporary restraining order was denied on July 29, 2011 and we have since sought review with the Delaware Supreme Court.

No assurances can be given regarding the outcome of this litigation against Dynegy. As of June 30, 2011, our gross investment in these leases was $264 million. A foreclosure event could result in an aggregate after tax charge between $170 million and $180 million. As part of this potential foreclosure event, PSEG could be required to pay approximately $100 million to satisfy income tax obligations. This potential cash tax obligation is fully reflected in the overall estimate of the aggregate after tax charge.

### RESULTS OF OPERATIONS

The results for PSEG, PSE&G, Power and Energy Holdings for the three months and six months ended June 30, 2011 and 2010 are presented below:

| Earnings (Losses) | Three Months Ended June 30, 2011 Millions | 2010 | Six Months Ended June 30, 2011 | 2010 |
| --- | ---: | ---: | ---: | ---: |
| Power | $205 | $202 | $502 | $573 |
| PSE&G | 105 | 3 | 268 | 121 |
| Energy Holdings | 5 | 12 | 2 | 19 |
| Other (A) | 5 | 5 | 10 | 7 |
| **PSEG Income from Continuing Operations** | 320 | 222 | 782 | 720 |
| PSEG Income (Loss) from Discontinued Operations (B) | 3 | 2 | 67 | (5) |
| **PSEG Net Income** | **$323** | **$224** | **$849** | **$715** |

| Earnings Per Share (Diluted) | Three Months Ended June 30, 2011 | 2010 | Six Months Ended June 30, 2011 | 2010 |
| --- | ---: | ---: | ---: | ---: |
| **PSEG Income from Continuing Operations** | **$0.63** | **$0.44** | **$1.54** | **$1.42** |
| Income (Loss) from Discontinued Operations | 0.00 | 0.00 | 0.13 | (0.01) |
| **PSEG Net Income** | **$0.63** | **$0.44** | **$1.67** | **$1.41** |

(A) Other primarily includes parent company interest and financing costs, donations and certain administrative and general expenses.

(B) See Note 4. Discontinued Operations and Dispositions.

Our results include the realized gains, losses and earnings on Power’s Nuclear Decommissioning Trust (NDT) funds and other related NDT activity. This includes the net realized gains, interest and dividend income and other costs related to the NDT funds which are recorded in Other Income and Deductions. This also includes credit-related impairments on certain NDT securities which are included in Other-Than-Temporary Impairments and the interest accretion expense on Power’s nuclear Asset Retirement Obligation (ARO), which is recorded in Operation and Maintenance Expense and the depreciation expense related to the ARO asset.

Our results also include the after-tax impacts of non-trading mark-to-market (MTM) activity.

The quarter-over-quarter and six month-over-six month variances in our Income from Continuing Operations include the changes related to NDT and MTM shown in the chart below:

|  | Three Months Ended June 30, 2011 Millions, after tax | 2010 | Six Months Ended June 30, 2011 | 2010 |
| --- | ---: | ---: | ---: | ---: |
| NDT Fund Income (Expense) | $15 | $10 | $42 | $20 |
| Non-Trading Mark-to-Market Gains (Losses) | $4 | $(37) | $8 | $12 |

65

In addition to the changes in NDT and MTM, our increase in Income from Continuing Operations for the three months ended June 30, 2011 was driven primarily by:

- the absence of a $122 million charge recorded in June 2010 related to our agreement to refund previous Market Transition Charge (MTC) collections,
- higher transmission and distribution rates,
- lower Operations and Maintenance costs reflecting lower pension and other postretirement employee benefit (OPEB) costs and the absence of a 2010 write-off associated with the new customer accounting system, and
- reduced losses on certain wholesale electric energy supply contracts,
- partially offset by lower volumes and pricing on our BGS contracts, and
- higher depreciation expense related to the completion of installation of back-end technology at two of our fossil plants.

Our increase in Income from Continuing Operations for the six months ended June 30, 2011 was driven primarily by:

- the absence of a $122 million charge related to our agreement to refund previous MTC collections,
- higher transmission and distribution rates, and
- lower Operations and Maintenance costs reflecting the same items discussed above for the three month period and lower storm restoration costs,
- partially offset by lower volumes and pricing on our BGS contracts, and
- higher interest costs and depreciation expense related to the completion of installation of back-end technology at two of our fossil plants.

### PSEG

Our results of operations are primarily comprised of the results of operations of our operating subsidiaries, Power, PSE&G and Energy Holdings, excluding charges related to intercompany transactions, which are eliminated in consolidation. We also include certain financing costs, charitable contributions and general and administrative costs at the parent company. For additional information on intercompany transactions, see Note 17. Related-Party Transactions. For an explanation of the variances, see the discussions for Power, PSE&G and Energy Holdings that follow the table below.

|  | Three Months Ended June 30, 2011 Millions | 2010 | Increase/ (Decrease) 2011 vs 2010 Millions% |  | Six Months Ended June 30, 2011 Millions | 2010 | Increase/ (Decrease) 2011 vs 2010 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $2,469 | $2,361 | $108 | 5 | $5,823 | $5,934 | $(111) | (2) |
| Energy Costs | 1,010 | 1,072 | (62) | (6) | 2,573 | 2,760 | (187) | (7) |
| Operation and Maintenance | 575 | 601 | (26) | (4) | 1,226 | 1,271 | (45) | (4) |
| Depreciation and Amortization | 235 | 229 | 6 | 3 | 476 | 456 | 20 | 4 |
| Income from Equity Method Investments | 4 | 5 | (1) | (20) | 7 | 8 | (1) | (13) |
| Other Income and (Deductions) | 40 | 35 | 5 | 14 | 103 | 62 | 41 | 66 |
| Other-Than-Temporary Impairments | 1 | 5 | (4) | (80) | 5 | 6 | (1) | (17) |
| Interest Expense | 117 | 120 | (3) | (3) | 244 | 236 | 8 | 3 |
| Income Tax Expense | 227 | 124 | 103 | 83 | 556 | 485 | 71 | 15 |
| Income (Loss) from Discontinued Operations | 3 | 2 | 1 | 50 | 67 | (5) | 72 | NA |

66

### Power

|  | Three Months Ended June 30, 2011 Millions | 2010 | Increase/ (Decrease) 2011 vs 2010 | Six Months Ended June 30, 2011 | 2010 | Increase/ (Decrease) 2011 vs 2010 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Income from Continuing Operations | $205 | $202 | $3 | $502 | $573 | $(71) |
| Income (Loss) from Discontinued Operations, net of tax | $3 | $2 | $1 | $67 | $(5) | $72 |
| Net Income | $208 | $204 | $4 | $569 | $568 | $1 |

For the three months ended June 30, 2011 the primary reasons for the $3 million increase in Income from Continuing Operations were

- improved results related to our MTM activity, and
- reduced losses on certain wholesale electric energy supply contracts,
- partially offset by lower average pricing and volumes for electricity sold under our BGS contracts,
- higher Operation and Maintenance expense related to outage work at certain of our fossil plants, and
- higher depreciation expense related to the completion of installation of back-end technology at two of our fossil plants.

For the six months ended June 30, 2011 the primary reasons for the $71 million decrease in Income from Continuing Operations were

- lower average pricing and volumes for electricity sold under our BGS contracts,
- higher Operation and Maintenance expense related to refurbishments at certain of our fossil plants, and
- higher interest costs and depreciation expense related to the completion of installation of back-end technology at two of our fossil plants,
- partially offset by favorable amounts related to our NDT activity.

The quarter and year-to-date details for these variances are discussed below:

|  | Three Months Ended June 30, 2011 Millions | 2010 | Increase/(Decrease) 2011 vs 2010 Millions% |  | Six Months Ended June 30, 2011 Millions | 2010 | Increase /(Decrease) 2011 vs 2010 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $1,285 | $1,264 | $21 | 2 | $3,252 | $3,460 | $(208) | (6) |
| Energy Costs | 603 | 612 | (9) | (1) | 1,738 | 1,863 | (125) | (7) |
| Operation and Maintenance | 271 | 260 | 11 | 4 | 548 | 511 | 37 | 7 |
| Depreciation and Amortization | 56 | 44 | 12 | 27 | 110 | 87 | 23 | 26 |
| Other Income (Deductions) | 35 | 30 | 5 | 17 | 93 | 55 | 38 | 69 |
| Other-Than-Temporary Impairments | 1 | 5 | (4) | (80) | 3 | 6 | (3) | (50) |
| Interest Expense | 41 | 42 | (1) | (2) | 92 | 82 | 10 | 12 |
| Income Tax Expense | 143 | 129 | 14 | 11 | 352 | 393 | (41) | (10) |
| Income (Loss) from Discontinued Operations | 3 | 2 | 1 | 50 | 67 | (5) | 72 | N/A |

67

### For the three months ended June 30, 2011 as compared to 2010

**Operating Revenues** increased $21 million due to

***Trading Revenues*** increased $15 million due primarily to lower net losses on certain electric energy supply contracts in 2011.

***Generation Revenues*** increased $8 million due primarily to

- higher net revenues of $65 million resulting principally from less unfavorable net results from financial hedging transactions in 2011 in the PJM, NY and New England (NE) power pools, partially offset by lower generation volumes sold in these power pools, and
- an increase of $40 million from new wholesale load contracts in PJM and the NE regions commencing in January 2011 and April 2011, respectively,
- partially offset by a net decrease of $81 million due to lower average pricing and lower volumes sold under our BGS contracts, and
- decreases of $11 million due to lower capacity payments from PJM resulting from lower prices and $4 million due to lower auction revenue rights rates.

***Gas Supply Revenues*** decreased $2 million due primarily to

- a net decrease of $4 million due to lower sales volumes at higher average prices to third party customers,
- partially offset by a net increase of $2 million in sales under the BGSS contract, substantially comprised of increased volumes of sales due to cooler average temperatures in April 2011, substantially offset by lower average gas sales prices in 2011.

### Operating Expenses

***Energy Costs*** represent the cost of generation, which includes fuel purchases for generation as well as purchased energy in the market, and gas purchases to meet Power’s obligation under its BGSS contract with PSE&G. Energy Costs decreased by $9 million entirely due to

- **Gas costs**, principally related to Power’s obligations under the BGSS contract, reflecting lower average gas inventory costs partially offset by higher demand due to cooler average temperatures in April 2011.

***Operation and Maintenance*** increased $11 million due primarily to

- a $7 million net increase due largely to higher outage costs at our coal-fired Keystone facility in Pennsylvania, and our gas-fired Bergen and coal-fired Mercer facilities in New Jersey as well as baghouse filter replacement costs at Mercer, and
- an increase of $4 million in materials and contract labor for refurbishment projects related to the cooling, circulation and transfer of water at our Salem nuclear facilities in 2011.

***Depreciation and Amortization*** increased $12 million due primarily to

- a $9 million increase due to completion of installation of back-end technology at the end of 2010 at our Mercer and Hudson generating facilities, and
- a $3 million increase due to higher depreciable asset bases at Nuclear and Fossil.

**Other Income and (Deductions)—**The net increase of $5 million was due primarily to higher net realized gains on the NDT funds.

**Other-Than-Temporary Impairments** decreased $4 million due to the absence in 2011 of $4 million of impairments on the NDT Funds recorded in 2010.

**Interest Expense** experienced no material change.

**Income Tax Expense** increased $14 million in 2011 due primarily to higher pre-tax income and the absence of tax benefits recorded in the second quarter of 2010 associated with manufacturer’s deductions under the American Jobs Creation Act of 2004.

### Income (Loss) from Discontinued Operations

In January 2011, we reached agreement to sell our two 1,000 MW combined-cycle generating facilities in Texas in separate transactions. In March 2011, we completed the sale of one plant for proceeds of $352 million at an after-tax gain of $54 million. In July 2011, we completed the sale of the second plant for proceeds of approximately $335 million at an after-tax gain of approximately $25 million. The sale of the second plant will be reflected in Power’s Condensed Consolidated Financial Statements for the third quarter of 2011. The results of operations for both plants are included in this category.

See Note 4. Discontinued Operations and Dispositions for additional information.

### For the six months ended June 30, 2011 as compared to 2010

**Operating Revenues** decreased $208 million due to

***Generation Revenues*** decreased $110 million due primarily to

- a net decrease of $140 million due primarily to lower average pricing and lower volumes of electricity sold under our BGS contracts,
- lower net revenues of $32 million resulting principally from less favorable results from financial hedging transactions in the various power pools and lower generation volumes sold in the PJM, NE and NY power pools, and
- decreases of $6 million due to lower capacity payments from PJM resulting from lower prices and $11 million due to lower auction revenue rights rates,
- partially offset by an increase of $80 million from new wholesale load contracts in PJM and the NE regions commencing in January 2011 and April 2011, respectively,

***Gas Supply Revenues*** decreased $86 million due primarily to

- a net decrease of $106 million in sales under the BGSS contract, substantially comprised of lower average gas sales prices partially mitigated by increased volumes of sales due to colder average temperatures during the 2011 winter heating season,
- partially offset by a net increase of $20 million due to higher sales volumes at lower average prices to third party customers.

***Trading Revenues*** decreased $12 million due primarily to higher net losses in 2011 on certain electric energy supply contracts.

### Operating Expenses

***Energy Costs*** represent the cost of generation, which includes fuel purchases for generation as well as purchased energy in the market, and gas purchases to meet Power’s obligation under its BGSS contract with PSE&G. Energy Costs decreased $125 million due to

- **Gas costs** decreased $94 million, principally related to Power’s obligations under the BGSS contract, reflecting lower average gas inventory costs partially offset by higher demand due to colder average temperatures in the winter heating season in 2011, as well as higher demand by third party customers.
- **Generation costs** decreased $31 million due primarily to $72 million of lower net fossil fuel costs, primarily reflecting the utilization of lower volumes of coal and natural gas and the lower cost of natural gas, $35 million of lower net congestion charges incurred in 2011 from PJM and a $13 million decrease due to lower impairment charges in 2011 related to excess SO2 emissions allowances. These decreases were partly offset by an increase of $80 million in spot energy purchases in 2011 in the NE and PJM power pools in order to meet higher load contract demand in 2011, a $6 million increase in nuclear fuel costs and $6 million due to higher PJM transmission expense in 2011 as a result of new PJM load and a higher BGS contract rate.

***Operation and Maintenance*** increased $37 million due primarily to

- a $29 million net increase due largely to hot gas path inspection outage costs at our gas-fired Bethlehem Energy and Linden facilities in New York and New Jersey, respectively, as well as to higher outage costs at our coal-fired Keystone facility in Pennsylvania, our gas-fired Bergen and our coal-fired Mercer facilities in New Jersey and baghouse filter replacement costs at Mercer partially offset by refunds of easement costs related to certain of our fossil plants, and
- an increase of $8 million due to refurbishment projects at our Peach Bottom and Salem nuclear facilities.

***Depreciation and Amortization*** increased $23 million due primarily to

- a $19 million increase due to completion of installation of back-end technology at the end of 2010 at our Mercer and Hudson generating facilities, and
- a $4 million increase due to higher depreciable asset bases at Nuclear and Fossil.

**Other Income and (Deductions)—**The net increase of $38 million was due primarily to $42 million of higher net realized gains on the NDT funds mainly resulting from the liquidation of an underperforming fund in March 2011 and a rebalancing to move toward our target asset allocation.

**Other-Than-Temporary Impairments** decreased $3 million due to higher impairments of $4 million on the NDT Funds in 2010 and an impairment of $1 million on the Rabbi Trust Fund in 2011.

**Interest Expense** increased $10 million due primarily to

- lower capitalized interest of $24 million resulting primarily from the installation by year-end 2010 of back-end technology at our Mercer and Hudson fossil stations,
- partially offset by lower interest expense of $12 million due to the redemption of $606 million of 7.75% Senior Notes in early April 2011 and lower amortization of long-term debt issuance costs of $3 million.

**Income Tax Expense** decreased $41 million in 2011 due primarily to lower pre-tax income.

### Income (Loss) from Discontinued Operations

As discussed above, we sold our two Texas plants in March 2011 and July 2011, respectively. The results of operations for both plants, including the after-tax gain of $54 million from the March 2011 sale, are included in this category.

See Note 4. Discontinued Operations and Dispositions for additional information.

### PSE&G

|  | Three Months Ended June 30, 2011 | 2010 | Increase/ (Decrease) 2011 vs 2010 Millions | Six Months Ended June 30, 2011 | 2010 | Increase/ (Decrease) 2011 vs 2010 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Income from Continuing Operations | $105 | $3 | $102 | $268 | $121 | $147 |
| Net Income | $105 | $3 | $102 | $268 | $121 | $147 |

For the three months ended June 30, 2011, the primary reasons for the $102 million increase in Income from Continuing Operations were

- the absence of a $122 million charge recorded in June 2010 related to the refund of previous MTC collections,
- higher annualized base rates for electric and gas delivery as well as transmission, and
- lower Operation and Maintenance expense.

For the six months ended June 30, 2011, the primary reasons for the $147 million increase in Income from Continuing Operations were

- the absence of a $122 million charge recorded in June 2010 related to the refund of previous MTC collections,
- higher annualized base rates for electric and gas delivery as well as transmission,
- higher gas delivery volumes, and
- lower Operation and Maintenance expense.

The quarter and year-to-date details for these variances are discussed below:

|  | Three Months Ended June 30, 2011 Millions | 2010 | Increase/ (Decrease) 2011 vs 2010 Millions% |  | Six Months Ended June 30, 2011 Millions | 2010 | Increase/ (Decrease) 2011 vs 2010 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $1,571 | $1,536 | $35 | 2 | $3,877 | $3,980 | $(103) | (3) |
| Energy Costs | 815 | 917 | (102) | (11) | 2,181 | 2,457 | (276) | (11) |
| Operation and Maintenance | 304 | 343 | (39) | (11) | 672 | 757 | (85) | (11) |
| Depreciation and Amortization | 172 | 177 | (5) | (3) | 351 | 354 | (3) | (1) |
| Other Income (Deductions) | 4 | 3 | 1 | 33 | 8 | 7 | 1 | 14 |
| Other-Than-Temporary Impairments | 0 | 0 | 0 | 0 | 1 | 0 | 1 | N/A |
| Interest Expense | 78 | 80 | (2) | (3) | 157 | 157 | 0 | 0 |
| Income Tax Expense (Benefit) | 73 | (9) | 82 | N/A | 184 | 71 | 113 | N/A |

### For the three months ended June 30, 2011 as compared to 2010

**Operating Revenues** increased $35 million due primarily to

***Clause Revenues*** increased $111 million due primarily to the absence of a $122 million charge recorded in June 2010 related to our agreement to refund previous MTC collections over two years and higher Societal Benefits Charge (SBC) and Margin Adjustment Clause (MAC) of $13 million, partially offset by lower Securitization Transition Charge (STC) revenues of $24 million. The changes in STC, SBC and MAC amounts were entirely offset by the amortization of related costs (Regulatory Assets) in Operation and Maintenance, Depreciation and Amortization and Interest Expense. PSE&G earns no margins on SBC, STC or MAC collections.

***Delivery Revenues*** increased $24 million due primarily to an increase in prices for electric and gas distribution and transmission.

- Gas distribution revenues were up $19 million due primarily to higher sales volumes of $10 million, higher Weather Normalization Clause revenue of $7 million and the impact of the prior year July base rate increase of $5 million, partially offset by lower capital stimulus revenue of $3 million.
- Transmission revenues were up $9 million due primarily to prior year net rate increases.
- Electric distribution revenues were down $4 million due primarily to lower sales volumes of $9 million and lower stimulus revenue of $4 million, partially offset by the impact of the prior year June base rate increases of $9 million.

***Other Operating Revenues*** increased $2 million due primarily to increased revenues from our appliance repair business and miscellaneous electric operating revenues.

***Commodity Revenue*** decreased $102 million due to lower Electric and Gas revenues. This is entirely offset as savings in Energy Costs. PSE&G earns no margin on the provision of BGS and BGSS.

- Electric revenues decreased $86 million due primarily to $139 million in lower BGS revenues, partially offset by $53 million in higher revenues from the sale of Non-Utility Generation (NUG) energy and collections of non-utility generation charges (NGC) due primarily to higher prices. BGS sales were down 18% due primarily to large customer migration to third party suppliers (TPS); in contrast delivery sales were down only 3% due to weather.
- Gas revenues decreased $16 million due to lower BGSS prices of $37 million, partially offset by higher BGSS volumes of $21 million due to weather. The average price of gas was 19% lower in 2011 than in 2010.

**Energy Costs** decreased $102 million. This is entirely offset by Commodity Revenue. Details are as follows:

- Electric costs decreased $86 million due to $113 million or 16% in lower BGS and NUG volumes due to large customer migration to TPS and NUG operations and $1 million of lower BGS and NUG prices, partially offset by $28 million for increased deferred cost recovery.
- Gas costs decreased $16 million due to $37 million or 19% in lower prices, partially offset by $21 million or 11% in higher sales volumes due primarily to weather.

**Operation and Maintenance** decreased $39 million due primarily to

- $21 million of lower net deferred expenses associated with SBC, Regional Greenhouse Gas Initiative (RGGI) and Stimulus clauses,
- a $17 million decrease in pension and OPEB expenses, and
- the absence of $16 million in expenses relating to 2010 rate case disallowances,
- partially offset by a $14 million increase in bad debt expense.

**Depreciation and Amortization** decreased $5 million due primarily to

- a decrease of $15 million for amortization of Regulatory Assets,
- partially offset by an increase of $8 million for additional plant in service, and
- an increase of $2 million in software amortization,

**Other Income and (Deductions)** experienced no material change.

**Other-Than-Temporary Impairments** experienced no change.

**Interest Expense** decreased $2 million due primarily to lower average debt balances.

**Income Tax Expense** increased $82 million due primarily to higher pre-tax income.

### For the six months ended June 30, 2011 as compared to 2010

**Operating Revenues** decreased $103 million due primarily to

***Commodity Revenue*** decreased $276 million due to lower Electric and Gas revenues. This is entirely offset as savings in Energy Costs. PSE&G earns no margin on the provision of BGS and BGSS.

- Gas revenues decreased $154 million due to lower BGSS prices of $201 million, partially offset by higher BGSS volumes of $47 million due to colder weather. The average price of gas was 20% lower in 2011 than in 2010.
- Electric revenues decreased $122 million due primarily to $194 million in lower BGS revenues, partially offset by $72 million in higher revenues from the sale of NUG energy and collections of NGC due primarily to higher prices. BGS sales were down 15% due primarily to large customer migration to TPS; in contrast delivery sales were down by only 2% due to weather.

***Clause Revenues*** increased $116 million due primarily to the absence of $122 million charge recorded in June 2010 related to our agreement to refund previous MTC collections over two years, and higher SBC and MAC of $37 million, partially offset by lower STC revenues of $43 million. The changes in STC, SBC and MAC amounts were entirely offset by the amortization of related costs (Regulatory Assets) in Operation and Maintenance, Depreciation and Amortization and Interest Expense. PSE&G earns no margins on SBC, STC or MAC collections.

***Delivery Revenues*** increased $52 million due primarily to an increase in prices for electric and gas distribution and transmission.

- Gas distribution revenues were up $35 million due primarily to higher sales volumes of $26 million, the impact of the prior year July base rate increase of $16 million and higher Weather Normalization Clause revenue of $3 million, partially offset by lower capital stimulus revenue of $10 million.
- Transmission revenues were up $16 million due primarily to net rate increases.
- Electric distribution revenues were up $1 million due primarily to the impact of the prior year June base rate increases of $18 million, partially offset by lower sales volumes of $9 million and lower stimulus revenue of $8 million.

***Other Operating Revenues*** increased $5 million due primarily to increased revenues from our appliance repair business and miscellaneous electric operating revenues.

**Energy Costs** decreased $276 million. This is entirely offset by Commodity Revenue. Details are as follows:

- Gas costs decreased $154 million due to $201 million or 20% in lower prices, partially offset by $47 million or 5% in higher sales volumes due primarily to weather.
- Electric costs decreased $122 million due to $201 million or 14% in lower BGS and NUG volumes due to large customer migration to TPS and NUG operations, partially offset by $69 million for increased deferred cost recovery and $10 million of higher BGS and NUG prices.

**Operation and Maintenance** decreased $85 million due to

- $35 million of lower net deferred expenses associated with SBC, RGGI and Stimulus clauses,
- a $30 million decrease in pension and OPEB expenses,
- the absence of $16 million in expenses relating to 2010 rate case disallowances,
- a $14 million reduction in storm restoration work, and
- a $4 million decrease in other operating expenses, primarily incentive payments,
- partially offset by a $14 million increase in bad debt expense.

**Depreciation and Amortization** decreased $3 million due primarily to

- a decrease of $23 million for amortization of Regulatory Assets,
- partially offset by an increase of $15 million for additional plant in service, and
- an increase of $4 million in software amortization.

**Other Income and (Deductions)** experienced no material change.

**Other-Than-Temporary Impairments** experienced no material change.

**Income Tax Expense** increased $113 million due primarily to higher pre-tax income.

### Energy Holdings

|  | Three Months Ended June 30, 2011 Millions | 2010 | Increase/ (Decrease) 2011 vs 2010 | Six Months Ended June 30, 2011 | 2010 | Increase/ (Decrease) 2011 vs 2010 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Income from Continuing Operations | $5 | $12 | $(7) | $2 | $19 | $(17) |
| Net Income | $5 | $12 | $(7) | $2 | $19 | $(17) |

73

For the three months and six months ended June 30, 2011, the primary reason for the $7 million and $17 million decreases in Income from Continuing Operations was the absence of tax benefits related to two projects entering service in 2010 and lower lease related gains.

### LIQUIDITY AND CAPITAL RESOURCES

The following discussion of our liquidity and capital resources is on a consolidated basis, noting the uses and contributions, where material, of our three direct operating subsidiaries.

### Operating Cash Flows

Our operating cash flows combined with cash on hand and financing activities are expected to be sufficient to fund capital expenditures and shareholder dividend payments.

For the six months ended June 30, 2011, our operating cash flow increased $875 million as compared to the same period in 2010. The net change was due primarily to net changes from Power, PSE&G and Energy Holdings, as discussed below.

### Power

Power’s operating cash flow increased $392 million from $754 million to $1,146 million for the six months ended June 30, 2011, as compared to the same period in 2010, primarily resulting from

- an increase of $335 million due to lower tax payments primarily related to the benefits of accelerated tax depreciation under new tax provisions enacted in 2010 (see Note 13. Income Taxes for additional information), and
- an increase of $180 million due to higher collections of accounts receivable,
- partially offset by a decrease of $91 million due to higher payments of counterparty payables.

### PSE&G

PSE&G’s operating cash flow increased $300 million from $(21) million to $279 million for the six months ended June 30, 2011, as compared to the same period in 2010, due primarily to higher earnings for the period combined with

- an increase of $126 million due to lower tax payments primarily related to the benefits of accelerated tax depreciation under new tax provisions enacted in 2010 (see Note 13. Income Taxes for additional information), and
- an increase of $114 million due to higher collections of customer receivables.

### Energy Holdings

Energy Holdings’ operating cash flow improved $165 million for the six months ended June 30, 2011, as compared to the same period in 2010, primarily due to lower tax payments in 2011 related to lease sale activity.

### Short-Term Liquidity

PSEG meets its short-term liquidity requirements, as well as those of Power, primarily through the issuance of commercial paper. PSE&G maintains its own separate commercial paper program to meet its short-term liquidity requirements. Both commercial paper programs are fully back-stopped by their own separate credit facilities.

The commitments under our credit facilities are provided by a diverse bank group. As of June 30, 2011, no single institution represented more than 8% of the total commitments in our credit facilities.

As of June 30, 2011, our total credit capacity was in excess of our anticipated maximum liquidity requirements through the end of 2011.

Each of our credit facilities is restricted as to availability and use to the specific companies as listed below; however, if necessary, the PSEG facilities can also be used to support our subsidiaries’ liquidity needs. Our total credit facilities and available liquidity as of June 30, 2011 were as follows:

| Company/Facility PSEG | Total Facility Millions | As of June 30, 2011 Usage |  | Available Liquidity | Expiration Date | Primary Purpose |
| --- | ---: | ---: | --- | ---: | --- | --- |
| 5-year Credit Facility (A) | $500 | $14 | (C) | $486 | Dec 2012 | Commercial Paper (CP) Support/Funding/Letters of Credit |
| 5-year Credit Facility | 500 | 0 |  | 500 | Apr 2016 | Commercial Paper (CP) Support/Funding/Letters of Credit |
| **Total PSEG** | **$1,000** | **$14** |  | **$986** |  |  |
| **Power** |  |  |  |  |  |  |
| 5-year Credit Facility (B) | $1,600 | $170 | (C) | $1,430 | Dec 2012 | Funding/Letters of Credit |
| 5-year Credit Facility | 1,000 | 0 |  | 1,000 | Apr 2016 | Funding/Letters of Credit |
| Bilateral Credit Facility | 100 | 100 | (C) | 0 | Sept 2015 | Letters of Credit |
| **Total Power** | **$2,700** | **$270** |  | **$2,430** |  |  |
| **PSE&G** |  |  |  |  |  |  |
| 5-year Credit Facility | $600 | $298 |  | $302 | Apr 2016 | Commercial Paper (CP) Support/Funding/Letters of Credit |
| **Total PSE&G** | **$600** | **$298** |  | **$302** |  |  |
| **Total** | **$4,300** |  |  | **$3,718** |  |  |

(A) In December 2011, this facility will be reduced by $23 million.

(B) In December 2011, this facility will be reduced by $75 million.

(C) Includes amounts related to letters of credit outstanding.

On April 15, 2011, PSEG, Power and PSE&G entered into new 5-year credit agreements in the amounts of $500 million, $1 billion and $600 million, respectively. These new agreements will expire in April 2016. Concurrently, PSEG reduced its existing $1 billion credit facility to $500 million, Power terminated its existing $350 million credit facility, and PSE&G terminated its existing $600 million credit facility. As a result of these changes, Power’s total credit capacity increased by $650 million which increased our total credit capacity to $4.3 billion.

### Long-Term Debt Financing

For a discussion of our long-term debt transactions during 2011, see Note 9. Changes in Capitalization.

### Common Stock Dividends

For information related to cash dividends on our common stock, see Note 15. Earnings Per Share.

We expect to continue to pay cash dividends on our common stock; however, the declaration and payment of future dividends to holders of our common stock will be at the discretion of the Board of Directors and will depend upon many factors, including our financial condition, earnings, capital requirements of our businesses, alternate investment opportunities, legal requirements, regulatory constraints, industry practice and other factors that the Board of Directors deems relevant.

### Credit Ratings

If the rating agencies lower or withdraw our credit ratings, such revisions may adversely affect the market price of our securities and serve to materially increase our cost of capital and limit access to capital. Outlooks assigned to ratings are as follows: stable, negative (Neg) or positive (Pos). There is no assurance that the ratings will continue for any given period of time or that they will not be revised by the rating agencies, if, in their respective judgments, circumstances warrant. Each rating given by an agency should be evaluated independently of the other agencies’ ratings. The ratings should not be construed as an indication to buy, hold or sell any security. In April 2011, S&P published an updated credit opinion which left the ratings for PSEG, Power and PSE&G unchanged and improved their outlooks to positive from stable. In May 2011, Moody’s affirmed its ratings for PSEG, Power and PSE&G. PSE&G’s outlook was improved to positive from stable while the outlooks at PSEG and Power remain at stable. In August 2011, Fitch affirmed its ratings for PSEG, Power and PSE&G and kept all outlooks at stable.

|  | Moody’s(A) | S&P(B) | Fitch(C) |
| --- | --- | --- | --- |
| **PSEG** |  |  |  |
| Outlook | **Stable** | **Positive** | **Stable** |
| Commercial Paper | P2 | A2 | F2 |
| **Power** |  |  |  |
| Outlook | **Stable** | **Positive** | **Stable** |
| Senior Notes | Baa1 | BBB | BBB+ |
| **PSE&G** |  |  |  |
| Outlook | **Positive** | **Positive** | **Stable** |
| Mortgage Bonds | A2 | A– | A |
| Commercial Paper | P2 | A2 | F2 |

(A) Moody’s ratings range from Aaa (highest) to C (lowest) for long-term securities and P1 (highest) to NP (lowest) for short-term securities.

(B) S&P ratings range from AAA (highest) to D (lowest) for long-term securities and A1 (highest) to D (lowest) for short-term securities.

(C) Fitch ratings range from AAA (highest) to D (lowest) for long-term securities and F1 (highest) to D (lowest) for short-term securities.

### CAPITAL REQUIREMENTS

It is expected that all of our capital requirements over the next three years will come from a combination of internally generated funds and external debt financing. Projected construction and investment amounts for the years 2011 through 2013 have been revised subsequent to the Annual Report on Form 10-K for the year ended December 31, 2010. The revised amounts reflect an increase of approximately $670 million for PSE&G, due primarily to extensions to the Capital and Energy Efficiency Capital Stimulus Programs, which were approved by the BPU in July, and revisions to our anticipated spend for various transmission projects. In addition, we have removed $530 million of discretionary expenditures for non-utility renewables from our projections. We will continue to approach non-regulated solar and other renewables investments opportunistically, seeking projects that will provide attractive risk-adjusted returns for our shareholders. The current projected construction and investment expenditures, excluding nuclear fuel purchases, are presented in the table below. These amounts are subject to change, based on various factors.

| Power: | 2011 Millions | 2012 | 2013 |
| --- | ---: | ---: | ---: |
| Baseline Maintenance | $190 | $235 | $155 |
| Environmental / Regulatory | 95 | 65 | 85 |
| Fossil Growth Opportunities | 265 | 65 | 0 |
| Nuclear Expansion | 120 | 120 | 100 |
| **Total Power** | **$670** | **$485** | **$340** |
| **PSE&G:** |  |  |  |
| Transmission |  |  |  |
| Reliability Enhancements | $565 | $765 | $1,130 |
| Facility Replacement | 120 | 180 | 145 |
| Support Facilities | 5 | 5 | 5 |
| Distribution |  |  |  |
| Support Facilities | 40 | 40 | 40 |
| New Business | 120 | 130 | 140 |
| Reliability Enhancements | 135 | 155 | 70 |
| Facility Replacement | 270 | 285 | 140 |
| Environmental / Regulatory | 35 | 50 | 35 |
| Renewables / EMP | 330 | 235 | 75 |
| **Total PSE&G** | **$1,620** | **$1,845** | **$1,780** |
| **Other** | 45 | 40 | 25 |
| **Total PSEG** | **$2,335** | **$2,370** | **$2,145** |

### Power

During the six months ended June 30, 2011, Power made $283 million of capital expenditures, including interest capitalized during construction (IDC) but excluding $40 million for nuclear fuel, primarily related to various projects at Fossil and Nuclear. For additional information regarding current projects, see Note 8. Commitments and Contingent Liabilities.

### PSE&G

During the six months ended June 30, 2011, PSE&G made $697 million of capital expenditures, including $674 million of investment in plant, primarily for reliability of transmission and distribution systems and $23 million in solar loan investments. This does not include expenditures for cost of removal, net of salvage, of $25 million, which are included in operating cash flows.

### ACCOUNTING MATTERS

For information related to recent accounting matters, see Note 2. Recent Accounting Standards.

## Market risk

As filed, 3,414 characters.

The market risk inherent in our market-risk sensitive instruments and positions is the potential loss arising from adverse changes in commodity prices, equity security prices and interest rates as discussed in the Notes to Condensed Consolidated Financial Statements. It is our policy to use derivatives to manage risk consistent with business plans and prudent practices. We have a Risk Management Committee comprised of executive officers who utilize a risk oversight function to ensure compliance with our corporate policies and risk management practices.

Additionally, we are exposed to counterparty credit losses in the event of non-performance or non-payment. We have a credit management process, which is used to assess, monitor and mitigate counterparty exposure. In the event of non-performance or non-payment by a major counterparty, there may be a material adverse impact on our financial condition, results of operations or net cash flows.

### Commodity Contracts

The availability and price of energy-related commodities are subject to fluctuations from factors such as weather, environmental policies, changes in supply and demand, state and federal regulatory policies, market rules and other events. To reduce price risk caused by market fluctuations, we enter into supply contracts and derivative contracts, including forwards, futures, swaps and options with approved counterparties. These contracts, in conjunction with physical sales and other services, help reduce risk and optimize the value of owned electric generation capacity.

### Value-at-Risk (VaR) Models

We use VaR models to assess the market risk of our commodity businesses. The portfolio VaR model includes our owned generation and physical contracts, as well as fixed price sales requirements, load requirements and financial derivative instruments. VaR represents the potential losses, under normal market conditions, for instruments or portfolios due to changes in market factors, for a specified time period and confidence level. We estimate VaR across our commodity businesses.

Non-trading MTM VaR consists of MTM derivatives that are economic hedges, some of which qualify for hedge accounting. The non-trading MTM VaR calculation does not include market risks associated with activities that are subject to accrual accounting, primarily our generating facilities and some load serving activities. The MTM derivatives that are not hedges are included in the trading VaR.

The VaR models used are variance/covariance models adjusted for the change of positions with a 95% confidence level and a one-day holding period for the MTM trading and non-trading activities. The models assume no new positions throughout the holding periods; however, we actively manage our portfolio.

As of June 30, 2011, there was no trading VaR. As of December 31, 2010, trading VaR was $1 million.

| For the Three Months Ended June 30, 2011 95% Confidence level, Loss could exceed VaR one day in 20 days | Trading VaR Millions | Non-Trading MTM VaR |
| --- | ---: | ---: |
| Period End | $0 | $11 |
| Average for the Period | $1 | $9 |
| High | $2 | $19 |
| Low | $0 | $5 |
| 99.5% Confidence level, |  |  |
| Loss could exceed VaR one day in 200 days |  |  |
| Period End | $0 | $18 |
| Average for the Period | $1 | $14 |
| High | $3 | $30 |
| Low | $0 | $8 |

See Note 10. Financial Risk Management Activities for a discussion of credit risk.

## Controls and procedures

As filed, 1,757 characters.

### Disclosure Controls and Procedures

We have established and maintain disclosure controls and procedures as defined under Rule 13a-15(e) and 15d-15(e) promulgated under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) that are designed to provide reasonable assurance that information required to be disclosed in the reports that are filed or submitted under the Exchange Act is recorded, processed, summarized and reported and is accumulated and communicated to the Chief Executive Officer and Chief Financial Officer of each respective company, as appropriate, by others within the entities to allow timely decisions regarding required disclosure. We have established a disclosure committee which includes several key management employees and which reports directly to the Chief Financial Officer and Chief Executive Officer of each respective company. The committee monitors and evaluates the effectiveness of these disclosure controls and procedures. The Chief Financial Officer and Chief Executive Officer of each company have evaluated the effectiveness of the disclosure controls and procedures and, based on this evaluation, have concluded that disclosure controls and procedures at each respective company were effective at a reasonable assurance level as of the end of the period covered by the report.

### Internal Controls

We continually review our disclosure controls and procedures and make changes, as necessary, to ensure the quality of our financial reporting. There have been no changes in internal control over financial reporting that occurred during the second quarter of 2011 that have materially affected, or are reasonably likely to materially affect, each registrant’s internal control over financial reporting.

## Risk factors

As filed, 969 characters.

The Risk Factor shown below is to be added to those disclosed in Part I Item 1A of our 2010 Annual Reports on Form 10-K and Part II Item 1A of our March 31, 2011 Quarterly Reports on Form 10-Q.

**Any inability to recover the carrying amount of our assets could result in future impairment charges which could have a material adverse impact on our financial condition and results of operations**

In accordance with accounting guidance, management evaluates long-lived assets for impairment whenever events or changes in circumstances, such as significant adverse changes in regulation, business climate or market conditions, could potentially indicate an asset’s carrying amount may not be recoverable. Significant reductions in our expected revenues or cash flows for an extended period of time resulting from such events could result in future asset impairment charges, which could have a material adverse impact on our financial condition and results of operations.

Filed Aug 3, 2011.
Source: SEC EDGAR, the filing index for accession 0001193125-11-208082. Last ingested by Listed: Nov 6, 2026, 17:31 ET. No prices; not investment advice.