# PG&E Corp: Form 10-Q for the period ended Jun 30, 2011

- Company: [PG&E Corp](/companies/pcg.md) (CIK 1004980)
- Form: 10-Q
- Filed: 2011-08-04
- Accepted by EDGAR: Aug 4, 2011, 21:25 ET
- Period: 2011-06-30
- Accession: 0001193125-11-210616
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1004980/000119312511210616/d10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1004980/000119312511210616/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2011-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2011-04-01 to 2011-06-30 | $3.68bn | us-gaap:Revenues |
| Revenue | 6 months, 2011-01-01 to 2011-06-30 | $7.28bn | us-gaap:Revenues |
| Operating income | 3 months, 2011-04-01 to 2011-06-30 | $692.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2011-01-01 to 2011-06-30 | $1.18bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2011-04-01 to 2011-06-30 | $174.0m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2011-01-01 to 2011-06-30 | $351.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2011-04-01 to 2011-06-30 | $176.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2011-01-01 to 2011-06-30 | $300.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2011-04-01 to 2011-06-30 | $366.0m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2011-01-01 to 2011-06-30 | $568.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2011-04-01 to 2011-06-30 | $0.91 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2011-01-01 to 2011-06-30 | $1.41 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2011-04-01 to 2011-06-30 | $0.91 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2011-01-01 to 2011-06-30 | $1.41 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2011-04-01 to 2011-06-30 | 400,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2011-01-01 to 2011-06-30 | 399,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2011-01-01 to 2011-06-30 | $1.91bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months, 2011-01-01 to 2011-06-30 | $1.90bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 6 months, 2011-01-01 to 2011-06-30 | $349.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2011-06-30 | $350.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2011-06-30 | $6.12bn | us-gaap:AssetsCurrent |
| Total assets | at 2011-06-30 | $47.32bn | us-gaap:Assets |
| Current liabilities | at 2011-06-30 | $7.02bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2011-06-30 | $11.47bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2011-06-30 | $50.0m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2011-06-30 | $1.21bn | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2011-06-30 | $11.79bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 132,613 characters.

### RESULTS OF OPERATIONS

### OVERVIEW

PG&E Corporation, incorporated in California in 1995, is a holding company whose primary purpose is to hold interests in energy-based businesses. PG&E Corporation conducts its business principally through Pacific Gas and Electric Company (“Utility”), a public utility operating in northern and central California. The Utility generates revenues mainly through the sale and delivery of electricity and natural gas to customers. PG&E Corporation became the holding company of the Utility and its subsidiaries on January 1, 1997. Both PG&E Corporation and the Utility are headquartered in San Francisco, California. The Utility served 5 million electricity distribution customers and 4 million natural gas distribution customers at June 30, 2011.

The Utility is regulated primarily by the California Public Utilities Commission (“CPUC”) and the Federal Energy Regulatory Commission (“FERC”). The CPUC determines the rates and terms and conditions of service for the Utility’s electric and natural gas distribution operations, electric generation, and natural gas transportation and storage. The FERC determines the rates and terms and conditions of service for the Utility’s electric transmission operations and its interstate natural gas transportation contracts. Before setting rates, the CPUC and the FERC authorize the annual amount of revenue (“revenue requirements”) that the Utility is authorized to collect from its customers to recover its reasonable operating and capital costs of providing utility services. The authorized revenue requirements also provide the Utility an opportunity to earn a return on “rate base” (i.e., the Utility’s net investment in facilities, equipment, and other property used or useful in providing utility service to its customers). The CPUC requires the Utility to maintain a certain capital structure (i.e., the relative weightings of common equity, preferred equity, and debt) when financing its rate base and authorizes a specific rate of return on each capital component. Additionally, the Nuclear Regulatory Commission (“NRC”) oversees the licensing, construction, operation, and decommissioning of the Utility’s nuclear generation facilities, including the Diablo Canyon power plant (“Diablo Canyon”).

This is a combined quarterly report of PG&E Corporation and the Utility and should be read in conjunction with each company’s separate Condensed Consolidated Financial Statements and the Notes to the Condensed Consolidated Financial Statements included in this quarterly report. In addition, this quarterly report should be read in conjunction with PG&E Corporation’s and the Utility’s combined Annual Report on Form 10-K for the year ended December 31, 2010 which incorporates by reference each company’s audited Consolidated Financial Statements, the Notes to the Consolidated Financial Statements, and other information (“2010 Annual Report”).

### Key Factors Affecting Results of Operations and Financial Condition

PG&E Corporation’s and the Utility’s results of operations and financial condition depend primarily on whether the Utility is able to operate its business within authorized revenue requirements, recover its authorized costs timely, and earn its authorized rate of return. A number of factors have had, or are expected to have, a significant impact on PG&E Corporation’s and the Utility’s results of operations and financial condition, including:

- *The Outcome of Matters Related to the Utility’s Natural Gas Pipeline System.* On September 9, 2010, an underground 30-inch natural gas transmission pipeline (Line 132) owned and operated by the Utility, ruptured in a residential area located in the City of San Bruno, California (“San Bruno accident”). The National Transportation Safety Board (“NTSB”) is continuing its investigation of the San Bruno accident, but has not made a final determination of the probable cause. Additionally, several related investigations and proceedings are pending as discussed below in “Natural Gas Pipeline Matters.” The Utility estimates that it will incur costs associated with its natural gas pipeline system ranging from $350 million to $550 million in 2011, of which $126 million has been incurred during the six months ended June 30, 2011. PG&E Corporation and the Utility are uncertain what portion of these pipeline-related costs will ultimately be recoverable through rates. The Utility has recorded a cumulative provision of $279 million for third-party claims in connection with the San Bruno accident, and estimates that it may record as much as an additional $121 million, for a total possible loss of $400 million. The Utility continues to expect that a significant portion of these costs will be recovered through its insurance and recorded $60 million for insurance recoveries during the quarter ended June 30, 2011. (See Note 10 of the Notes to the Condensed Consolidated Financial Statements.) Finally, the CPUC is considering a stipulation between the Utility and the CPUC enforcement staff that would impose a fine of $26 million on the Utility to resolve the CPUC’s investigation of a natural gas explosion and fire that occurred on December 24, 2008 in a house located in Rancho Cordova, California (the “Rancho Cordova accident”). The resolutions of these foregoing matters, including the amount of any civil or criminal fines or penalties, may have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, or cash flows.
- *The Timing and Outcome of Ratemaking and Other Regulatory Proceedings*. The majority of the Utility’s base revenue requirements are determined in various rate cases by the CPUC and the FERC. On April 14, 2011, the CPUC issued a decision in the Utility’s 2011 Gas Transmission and Storage rate case (“GT&S”) that authorized the Utility to collect increased revenue

requirements from January 1, 2011. On May 5, 2011, the CPUC issued a final decision in the Utility’s 2011 General Rate Case (“GRC”) that authorized an increase in revenue requirements from January 1, 2011. (See “Results of Operations” and “Regulatory Matters” below.) From time to time, the Utility also requests that the CPUC authorize additional base revenue requirements for specific capital expenditure projects, such as new power plants. The Utility also collects revenue requirements to recover certain costs that the CPUC has authorized the Utility to pass through to customers, such as electric procurement costs. The Utility’s recovery of these costs is often subject to compliance and audit proceedings conducted by the CPUC which may result in the disallowance of costs previously recorded for recovery. The outcome of these proceedings can be affected by many factors, including general economic conditions, the level of customer rates, regulatory policies, and political considerations. (See “Risk Factors” in the 2010 Annual Report.)

- *The Ability of the Utility to Control Operating Costs and Capital Expenditures.* The Utility’s revenue requirements are generally set by the CPUC and the FERC at a level to allow the Utility the opportunity to recover its forecasted operating expenses, to recover depreciation, tax, and interest expenses associated with forecasted capital expenditures, and to earn a return on equity (“ROE”). Actual costs may differ from forecasts, or the Utility may incur significant unanticipated costs, such as costs related to storms, outages, catastrophic events, or costs incurred to comply with regulatory orders or legislation. Differences in the amount or timing of forecasted or authorized and actual costs can affect the Utility’s ability to earn its authorized rate of return and the amount of PG&E Corporation’s income available for common shareholders.
- *Authorized Rate of Return, Capital Structure, and Financing.* The Utility’s CPUC-authorized ROE of 11.35% is scheduled to remain in effect through 2012, but is subject to change based on an annual adjustment mechanism as described in the 2010 Annual Report. The Utility’s CPUC-authorized capital structure for its electric and natural gas distribution and electric generation rate base consists of 52% common equity and 48% debt and preferred stock and is scheduled to remain in effect through 2012. PG&E Corporation contributes equity to the Utility as needed by the Utility to maintain its CPUC-authorized capital structure. The Utility’s equity needs will be affected by the level of future debt financing which will depend on various factors, including the timing and amount of its capital expenditures. The Utility’s equity needs also will be affected by the amount of costs the Utility incurs in connection with the matters discussed below under “Natural Gas Pipeline Matters” to the extent the Utility is unable to conclude that the incurred costs are probable of recovery through rates. PG&E Corporation’s and the Utility’s ability to access the capital markets may, among other factors, be affected by the outcome of the various matters involving the Utility’s natural gas pipeline system. (See “Liquidity and Financial Resources” below.)

### Summary of Changes in Earnings per Common Share and Income Available for Common Shareholders for the Three and Six Months Ended June 30, 2011

PG&E Corporation’s income available for common shareholders for the three months ended June 30, 2011 increased by $29 million, or 9%, to $362 million, compared to $333 million for the same period in 2010. For the six months ended June 30, 2011, income available for common shareholders decreased by $30 million, or 5%, to $561 million, compared to $591 million for the same period in 2010. The following table is a summary reconciliation of the key changes in income available for common shareholders and earnings per common share for the three and six months ended June 30, 2011:

*(in millions)*

|  | Three Months Ended June 30, Earnings | Earnings Per Common Share (Diluted) | Six Months Ended June 30, Earnings | Earnings Per Common Share (Diluted) |
| --- | ---: | --- | ---: | --- |
| Income Available for Common Shareholders – June 30, 2010 | $333 | $0.86 | $591 | $1.54 |
| Natural gas pipeline matters (1) |  |  |  |  |
| Pipeline-related costs | (45) | (.11) | (76) | (.19) |
| Third-party liability claims | (35) | (.09) | (35) | (.09) |
| Insurance recoveries | 36 | .09 | 36 | .09 |
| Litigation and regulatory matters (2) | (3) | (.01) | (28) | (.07) |
| Nuclear refueling outage (3) | (24) | (.06) | (26) | (.06) |
| Storm and outage expenses (4) | (5) | (.01) | (23) | (.06) |
| Gas transmission revenues (5) | (6) | (.02) | (18) | (.05) |
| Increase in rate base earnings (6) | 68 | .17 | 82 | .21 |
| 2011 GRC and GT&S expense recovery (7) | 27 | .07 | - | - |
| Statewide ballot initiative (8) | 20 | .05 | 45 | .12 |
| Federal healthcare law (9) | - | - | 20 | .05 |
| Other (10) | (4) | - | (7) | (.02) |
| Increase in shares outstanding (11) | - | (.03) | - | (.06) |
| **Income Available for Common Shareholders – June 30, 2011** | $362 | $0.91 | $561 | $1.41 |

(1) During the three and six months ended June 30, 2011, the Utility incurred costs of $44 million and $75 million, respectively, after-tax, associated with its natural gas pipeline system. This included pipeline-related costs to review records, validate operating pressures, conduct hydrostatic pressure tests, inspect pipelines, and perform other activities associated with the Utility’s natural gas pipeline system. These costs also included an increase in the provision for third-party liability claims related to the San Bruno accident, reflecting settlements and changes in estimates and assumptions regarding these claims. Costs incurred were partially offset by insurance recoveries that have been deemed probable under applicable accounting standards as of June 30, 2011.

(2) During the three and six months ended June 30, 2011, the Utility incurred costs of $3 million and $28 million, respectively, after-tax, related to litigation and regulatory matters, which included amounts related to the Rancho Cordova accident.

(3) During the three and six months ended June 30, 2011, the Utility incurred higher expenses of $24 million and $26 million, respectively, after-tax, in connection with a scheduled refueling outage at Diablo Canyon.

(4) During the three and six months ended June 30, 2011, the Utility incurred higher expenses of $5 million and $23 million, respectively, after-tax, due to more severe storms as compared to the same period in 2010.

(5) During the three and six months ended June 30, 2011, the Utility recognized lower gas transmission revenues of $6 million and $18 million, respectively, after-tax, as compared to the same periods in 2010, primarily due to a decrease in natural gas storage revenues.

(6) During the three and six months ended June 30, 2011, the Utility recognized earnings of $68 million and $82 million, respectively, after-tax, attributable to the ROE on higher authorized capital investments authorized by the CPUC’s final decisions in the 2011 GRC and GT&S rate cases.

(7) During the three months ended June 30, 2011, the Utility recognized earnings of $27 million, after-tax, that offsets the unfavorable variance that occurred during the quarter ended March 31, 2011 as the Utility incurred costs before the CPUC issued its final decisions in the 2011 GRC and GT&S rate case.

(8) During the three and six months ended June 30, 2010, PG&E Corporation incurred $20 million and $45 million, respectively, to support Proposition 16 - The Taxpayers Right to Vote Act.

(9) During the six months ended June 30, 2010, the Utility recorded a charge of $20 million, triggered by the elimination of the tax deductibility of Medicare Part D federal subsidies.

(10) During the six months ended June 30, 2011, the Utility incurred higher costs for other operating and maintenance expenses, including environmental remediation.

(11) Represents the impact of a higher number of shares outstanding at June 30, 2011, compared to the number of shares outstanding at June 30, 2010, to maintain the Utility’s capital structure and fund operations, including expenses related to natural gas pipeline matters. This has no dollar impact on earnings.

### CAUTIONARY LANGUAGE REGARDING FORWARD-LOOKING STATEMENTS

This report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. These forward-looking statements relate to, among other matters, estimated capital expenditures; estimated environmental remediation, tax, and other liabilities; estimates and assumptions used in PG&E Corporation’s and the Utility’s critical accounting policies; the anticipated outcome of various regulatory, governmental, and legal proceedings; estimated losses and insurance recoveries associated with the San Bruno accident; the estimated range of additional costs the Utility will incur related to its natural gas transmission business; estimated future cash flows; and the level of future equity or debt issuances. These statements are also identified by words such as “assume,” “expect,” “intend,” “plan,” “project,” “believe,” “estimate,” “target,” “predict,” “anticipate,” “aim,” “may,” “might,” “should,” “would,” “could,” “goal,” “potential,” and similar expressions. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results. Some of the factors that could cause future results to differ materially from those expressed or implied by the forward-looking statements, or from historical results, include, but are not limited to:

- the Utility’s ability to efficiently manage capital expenditures and its operating and maintenance expenses within authorized levels and timely recover its costs through rates;
- the outcome of pending and future regulatory, legislative, or other proceedings or investigations related to the San Bruno accident, the results of the Utility’s system-wide review of the class location designations for its natural gas transmission, and the safety of the Utility’s natural gas transmission pipelines in its northern and central California service territory; whether the CPUC approves the proposed resolution of the investigation of the Rancho Cordova accident; whether the Utility incurs civil or criminal penalties as a result of these proceedings or investigations; the ultimate amount of costs the Utility incurs in connection with its natural gas pipeline system that the Utility is unable to recover through rates or insurance; and whether the Utility incurs third-party liabilities or other costs in connection with electric or natural gas service disruptions caused by pressure reductions in the Utility’s natural gas pipeline system;
- the outcome of future investigations or proceedings relating to the Utility’s compliance with law, rules, regulations, or orders applicable to the operation, inspection, and maintenance of its electric and gas facilities;
- reputational harm that PG&E Corporation and the Utility may suffer depending on the outcome of the various regulatory proceedings and investigations of the San Bruno accident and natural gas pipeline matters including the findings of the CPUC’s independent review panel; service disruptions caused by pressure reductions in the Utility’s natural gas pipeline system, the outcome of civil litigation; and the extent to which additional regulatory, civil, or criminal proceedings may be pursued by regulatory or governmental agencies;
- the adequacy and price of electricity and natural gas supplies, the extent to which the Utility can manage and respond to the volatility of electricity and natural gas prices, and the ability of the Utility and its counterparties to post or return collateral;
- explosions, fires, accidents, mechanical breakdowns, the disruption of information technology and systems, human errors, and similar events that may occur while operating and maintaining an electric and natural gas system in a large service territory with varying geographic conditions that can cause unplanned outages, reduce generating output, damage the Utility’s assets or operations, subject the Utility to third-party claims for property damage or personal injury, or result in the imposition of civil, criminal, or regulatory fines or penalties on the Utility;
- the impact of storms, earthquakes, floods, drought, wildfires, disease, and similar natural disasters, or acts of terrorism or vandalism, that affect customer demand or that damage or disrupt the facilities, operations, or information technology and systems owned by the Utility, its customers, or third parties on which the Utility relies;
- the potential impacts of climate change on the Utility’s electricity and natural gas businesses;
- changes in customer demand for electricity (“load”) and natural gas resulting from unanticipated population growth or decline, general economic and financial market conditions, the development of alternative energy technologies including self-generation and distributed generation technologies, or other reasons;
- the occurrence of unplanned outages at the Utility’s two nuclear generating units at Diablo Canyon, the availability of nuclear fuel, and the ability of the Utility to procure replacement electricity if nuclear generation from Diablo Canyon were unavailable;
- the outcome of seismic studies the Utility is conducting that could affect the Utility’s ability to continue operating Diablo Canyon or renew the operating licenses for Diablo Canyon, the issuance of NRC orders or the adoption of new legislation or regulations to address seismic risks at nuclear facilities to avoid the type of damage sustained by nuclear facilities in Japan following the March 2011

earthquake, or to address the operations, decommissioning, storage of spent nuclear fuel, security, safety, cooling water intake, or other operational or licensing matters associated with Diablo Canyon and whether the Utility is able to comply with such new orders, legislation, or regulations;

- whether the Utility earns incentive revenues or incurs obligations under incentive ratemaking mechanisms, such as the CPUC’s incentive ratemaking mechanism relating to energy savings achieved through implementation of the utilities’ customer energy efficiency programs;
- the impact of federal or state laws or regulations, or their interpretation, on energy policy and the regulation of utilities and their holding companies;
- whether the Utility can successfully complete its program to install advanced meters for its electric and natural gas customers, allay customer concerns about the new metering technology, and integrate the new meters with its customer billing and other systems while also implementing the system design changes necessary to accommodate retail electric rates based on dynamic pricing (i.e., electric rates that can vary with the customer’s time of use and are more closely aligned with wholesale electricity prices);
- how the CPUC interprets and enforces the financial and other conditions imposed on PG&E Corporation when it became the Utility’s holding company and the extent to which the interpretation or enforcement of these conditions has a material impact on PG&E Corporation;
- the extent to which PG&E Corporation or the Utility incurs costs in connection with third-party claims or litigation, that are not recoverable through insurance, rates, or from other third parties;
- the ability of PG&E Corporation, the Utility, and counterparties to access capital markets and other sources of credit in a timely manner on acceptable terms;
- the impact of environmental laws and regulations addressing the reduction of carbon dioxide and other greenhouse gases, water, the remediation of hazardous waste, and other matters, and whether the Utility is able to recover the costs of compliance with such laws, including the cost of emission allowances and offsets that the Utility may incur under federal or state cap and trade regulations;
- the loss of customers due to various forms of bypass and competition, including municipalization of the Utility’s electric distribution facilities, increasing levels of “direct access” by which consumers procure electricity from alternative energy providers, and implementation of “community choice aggregation,” which permits cities and counties to purchase and sell electricity for their local residents and businesses; and
- the outcome of federal or state tax audits and the impact of changes in federal or state tax laws, policies, or regulations, such as The Tax Relief, Unemployment Insurance Reauthorization, and Job Creation Act of 2010 (the “Tax Relief Act”).

For more information about the significant risks that could affect the outcome of these forward-looking statements and PG&E Corporation’s and the Utility’s future financial condition and results of operations, see the section entitled “Risk Factors” in the 2010 Annual Report and Item 1.A. Risk Factors, below. PG&E Corporation and the Utility do not undertake an obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

### RESULTS OF OPERATIONS

The table below details certain items from the accompanying Condensed Consolidated Statements of Income for the three and six months ended June 30, 2011 and 2010:

*(in millions)*

| Utility | Three Months Ended June 30, 2011 | 2010 | Six Months Ended June 30, 2011 | 2010 |
| --- | ---: | ---: | ---: | ---: |
| Electric operating revenues | $2,888 | $2,515 | $5,504 | $5,025 |
| Natural gas operating revenues | 795 | 717 | 1,775 | 1,682 |
| Total operating revenues | 3,683 | 3,232 | 7,279 | 6,707 |
| Cost of electricity | 906 | 863 | 1,794 | 1,783 |
| Cost of natural gas | 258 | 247 | 766 | 742 |
| Operating and maintenance | 1,228 | 958 | 2,454 | 1,948 |
| Depreciation, amortization, and decommissioning | 592 | 468 | 1,082 | 919 |
| Total operating expenses | 2,984 | 2,536 | 6,096 | 5,392 |
| Operating Income | 699 | 696 | 1,183 | 1,315 |
| Interest income | 2 | 2 | 4 | 4 |
| Interest expense | (169) | (164) | (340) | (320) |
| Other income (expense), net | 16 | 1 | 33 | (5) |
| Income Before Income Taxes | 548 | 535 | 880 | 994 |
| Income tax provision | 189 | 196 | 320 | 391 |
| Net Income | 359 | 339 | 560 | 603 |
| Preferred stock dividend requirement | 4 | 4 | 7 | 7 |
| Income Available for Common Stock | $355 | $335 | $553 | $596 |
| **PG&E Corporation, Eliminations, and Other(1)** |  |  |  |  |
| Operating revenues | $1 | $- | $2 | $- |
| Operating expenses | 8 | 1 | 9 | 2 |
| Operating Loss | (7) | (1) | (7) | (2) |
| Interest income | 1 | - | 1 | - |
| Interest expense | (5) | (11) | (11) | (23) |
| Other income, net | 5 | 1 | 5 | 1 |
| Loss Before Income Taxes | (6) | (11) | (12) | (24) |
| Income tax benefit | (13) | (9) | (20) | (19) |
| Net Income (Loss) | $7 | $(2) | $8 | $(5) |
| Consolidated Total |  |  |  |  |
| Operating revenues | $3,684 | $3,232 | $7,281 | $6,707 |
| Operating expenses | 2,992 | 2,537 | 6,105 | 5,394 |
| Operating Income | 692 | 695 | 1,176 | 1,313 |
| Interest income | 3 | 2 | 5 | 4 |
| Interest expense | (174) | (175) | (351) | (343) |
| Other income (expense), net | 21 | 2 | 38 | (4) |
| Income Before Income Taxes | 542 | 524 | 868 | 970 |
| Income tax provision | 176 | 187 | 300 | 372 |
| Net Income | 366 | 337 | 568 | 598 |
| Preferred stock dividend requirement of subsidiary | 4 | 4 | 7 | 7 |
| Income Available for Common Shareholders | $362 | $333 | $561 | $591 |

(1) PG&E Corporation eliminates all intercompany transactions in consolidation.

### Utility

The following presents the Utility’s operating results for the three and six months ended June 30, 2011 and 2010. These operating results reflect the increase in authorized revenues from January 1, 2011 that were approved by the CPUC during the quarter ended June 30, 2011 in the 2011 GRC and the 2011 GT&S rate case, of which $126 million pertains to the three month period ended March 31, 2011. (See “Regulatory Matters” below.)

### Electric Operating Revenues

The Utility’s electric operating revenues consist of amounts charged to customers for electricity generation and for electric transmission and distribution services, as well as amounts charged to customers to recover the cost of electric procurement, public purpose, energy efficiency, and demand response programs. The Utility provides electricity to residential, industrial, agricultural, and small and large commercial customers through its own generation facilities and through power purchase agreements with third parties. In addition, a portion of the Utility’s customers’ load is satisfied by electricity provided under long-term contracts between the California Department of Water Resources (“DWR”) and various power suppliers. The costs and associated revenues to recover the costs allocated to the Utility by the DWR are not included in the Condensed Consolidated Statements of Income.

The following table provides a summary of the Utility’s total electric operating revenues:

*(in millions)*

|  | Three Months Ended June 30, 2011 | 2010 | Six Months Ended June 30, 2011 | 2010 |
| --- | ---: | ---: | ---: | ---: |
| Revenues excluding pass-through costs | $1,738 | $1,472 | $3,261 | $2,915 |
| Revenues for recovery of passed-through costs | 1,150 | 1,043 | 2,243 | 2,110 |
| **Total electric operating revenues** | $2,888 | $2,515 | $5,504 | $5,025 |

The Utility’s total electric operating revenues, including revenues intended to recover costs that are passed through to customers, increased by $373 million, or 15%, in the three months ended June 30, 2011, and by $479 million, or 10%, in the six months ended June 30, 2011, as compared to the same periods in 2010. Costs that are passed through to customers and do not impact net income increased by $107 million and $133 million in the three and six months ended June 30, 2011, respectively, as compared to the same periods in 2010, primarily due to increases in the cost of public purpose programs, pension contributions, and the cost of electricity procurement (see “Cost of Electricity” below). Electric operating revenues, excluding costs passed through to customers, increased by $266 million and $346 million in the three and six months ended June 30, 2011, respectively, as compared to the same periods in 2010. The increase for both the three and six month periods ended June 30, 2011 consists primarily of additional base revenues that were authorized by the CPUC in the 2011 GRC on May 5, 2011, of which approximately $100 million pertains to the quarter ended March 31, 2011. (See “Regulatory Matters” below.)

The Utility’s future electric operating revenues for 2012 and 2013 are expected to increase, as authorized by the CPUC in the 2011 GRC. The Utility’s electric operating revenues are also expected to be impacted by the FERC’s final decision to be issued in the transmission owner (“TO”) rate case. (See “Regulatory Matters” below.) Additionally, the Utility’s future electric operating revenues will be impacted by the cost of electricity and other costs that are passed through to customers.

### Cost of Electricity

The Utility’s cost of electricity includes costs to purchase power from third parties, certain transmission costs, the cost of fuel used in its own generation facilities, the cost of fuel supplied to other facilities under tolling agreements and realized gains and losses on price risk management activities. The volume of power the Utility purchases is driven by customer demand, the availability of the Utility’s own electricity generation, and the cost-effectiveness of each source of electricity. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements.) The Utility’s cost of electricity is passed through to customers. The Utility’s cost of electricity excludes non-fuel costs associated with operating the Utility’s own generation facilities, which are included in operating and maintenance expense in the Condensed Consolidated Statements of Income.

The following table provides a summary of the Utility’s cost of electricity and the total amount and average cost of purchased power:

*(in millions)*

|  | Three Months Ended June 30, 2011 | 2010 | Six Months Ended June 30, 2011 | 2010 |
| --- | ---: | ---: | ---: | ---: |
| Cost of purchased power | $857 | $811 | $1,678 | $1,653 |
| Fuel used in own generation facilities | 49 | 52 | 116 | 130 |
| **Total cost of electricity** | $906 | $863 | $1,794 | $1,783 |
| Average cost of purchased power per kWh (1) | $0.088 | $0.084 | $0.088 | $0.083 |
| Total purchased power (in millions of kWh) | 9,709 | 9,708 | 19,137 | 19,825 |

(1) Kilowatt-hour

The Utility’s total cost of electricity increased by $43 million, or 5%, in the three months ended June 30, 2011 and $11 million, or 1%, in the six months ended June 30, 2011 as compared to the same periods in 2010, primarily due to an increase in the price of purchased power.

Various factors will affect the Utility’s future cost of electricity, including the market prices for electricity and natural gas, the availability of Utility-owned generation, and changes in customer demand. Additionally, the cost of electricity is expected to be impacted by the higher cost of procuring renewable energy as the Utility increases the amount of its renewable energy deliveries to comply with current and future California law and regulatory requirements. The Utility’s future cost of electricity also will be affected by federal or state legislation or rules that may be adopted to regulate GHG emissions. (See “Environmental Matters” below.)

### Natural Gas Operating Revenues

The Utility sells natural gas and natural gas transportation services. The Utility transports gas throughout its service territory. The Utility uses its distribution system to deliver gas to most end-use customers. In addition, the Utility delivers gas to large end-use customers who are connected directly to the transmission system. The Utility also delivers natural gas to off-system markets, primarily in southern California.

The following table provides a summary of the Utility’s natural gas operating revenues:

*(in millions)*

|  | Three Months Ended June 30, 2011 | 2010 | Six Months Ended June 30, 2011 | 2010 |
| --- | ---: | ---: | ---: | ---: |
| Revenues excluding pass-through costs | $454 | $416 | $858 | $830 |
| Revenues for recovery of passed-through costs | 341 | 301 | 917 | 852 |
| **Total natural gas operating revenues** | $795 | $717 | $1,775 | $1,682 |

The Utility’s natural gas operating revenues, including revenues intended to recover costs that are passed through to customers, increased by $78 million, or 11%, and by $93 million, or 6%, in the three and six months ended June 30, 2011, as compared to the same periods in 2010. Costs that are passed through to customers and do not impact net income increased by $40 million and $65 million in the three and six months ended June 30, 2011, respectively, as compared to the same periods in 2010, primarily due to an increase in the costs of natural gas procurement, public purpose programs, and pension contributions. (See “Cost of Natural Gas” below.) Natural gas operating revenues, excluding costs passed through to customers, increased by $38 million and $28 million in the three and six months ended June 30, 2011, respectively. The increase for both the three and six month periods ended June 30, 2011 was primarily due to $54 million in additional base revenues, which was partially offset by a decrease in natural gas storage revenues. The additional base revenues were authorized by the CPUC in the 2011 GT&S rate case on April 14, 2011 and the GRC on May 5, 2011, and included approximately $27 million pertaining to the quarter ended March 31, 2011. (See “Regulatory Matters” below.)

The Utility’s operating revenues for natural gas transportation and storage services in 2012, 2013, and 2014 are expected to increase, as authorized by the CPUC in the 2011 GT&S rate case. Additionally, the Utility’s revenues for natural gas distribution services in 2012 and 2013 are expected to increase, as authorized by the CPUC in the 2011 GRC. The Utility’s gas operating revenues for future years also will be impacted by changes in the cost of natural gas, the Utility’s gas transportation rates, natural gas throughput volume, and other factors. (See “Regulatory Matters” below.)

### Cost of Natural Gas

The Utility’s cost of natural gas includes the purchase costs of natural gas, transportation costs on interstate pipelines, and gas storage costs, but excludes the transportation costs on intrastate pipelines for core and non-core customers, which are included in operating and maintenance expense in the Condensed Consolidated Statements of Income. The Utility’s cost of natural gas also includes realized gains and losses on price risk management activities. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements.)

The following table provides a summary of the Utility’s cost of natural gas:

*(in millions)*

|  | Three Months Ended June 30, 2011 | 2010 | Six Months Ended June 30, 2011 | 2010 |
| --- | ---: | ---: | ---: | ---: |
| Cost of natural gas sold | $213 | $204 | $674 | $654 |
| Transportation cost of natural gas sold | 45 | 43 | 92 | 88 |
| **Total cost of natural gas** | $258 | $247 | $766 | $742 |
| Average cost per Mcf of natural gas sold | $3.80 | $3.58 | $4.27 | $4.63 |
| Total natural gas sold (in millions of Mcf) (1) | 56 | 57 | 158 | 152 |

(1) One thousand cubic feet

The Utility’s total cost of natural gas increased by $11 million, or 4%, in the three months ended June 30, 2011 as compared to the same period in 2010. The increase was primarily due to an increase in the market price of natural gas, partially offset by a decrease in procurement costs associated with lower demand caused by warmer weather during the period.

The Utility’s total cost of natural gas increased by $24 million, or 3%, in the six months ended June 30, 2011 as compared to the same period in 2010. The increase was primarily due to the absence of a $49 million refund the Utility received in the first quarter of 2010 for pass through to customers as part of a litigation settlement. This was partially offset by a decrease in procurement costs resulting from a decline in the average market price of natural gas purchased during the first quarter of 2011.

The Utility’s future cost of natural gas will be affected by the market price of natural gas and changes in customer demand. In addition, the Utility’s future cost of natural gas may be affected by federal or state legislation or rules to regulate the GHG emissions from the Utility’s natural gas transportation and distribution facilities and from natural gas consumed by the Utility’s customers.

### Operating and Maintenance

Operating and maintenance expenses consist mainly of the Utility’s costs to operate and maintain its electricity and natural gas facilities, customer billing and service expenses, the cost of public purpose programs, and administrative and general expenses.

The Utility’s operating and maintenance expenses (including costs currently passed through to customers) increased by $270 million, or 28%, in the three months ended June 30, 2011, as compared to the same period in 2010. Costs that are passed through to customers and do not impact net income increased by $64 million, primarily due to the cost of public purpose programs and pension plan contributions. Excluding costs currently passed through to customers, operating and maintenance expenses increased by $206 million. This increase was attributable to a number of factors, including $69 million for labor and other maintenance-related costs, the majority of which is associated principally with the scheduled refueling outage at Diablo Canyon and more severe storms in 2011; $17 million for higher environmental remediation costs, primarily related to the Utility’s natural gas compressor site located near Hinkley, California; and increases in other expenses. Additionally, the Utility incurred costs of $74 million in connection with matters described below in “Natural Gas Pipeline Matters.” This amount included $75 million of pipeline-related costs to review records, validate operating pressures, conduct hydrostatic pressure tests, inspect pipelines, and perform other activities associated with the Utility’s natural gas pipeline system; a $59 million increase to the provision for third-party liability claims related to the San Bruno accident, reflecting the outcome of settlements and changes in estimates and assumptions regarding these claims; partially offset by $60 million for insurance recoveries related to third-party liability costs. (See Note 10 of the Notes to the Condensed Consolidated Financial Statements.)

The Utility’s operating and maintenance expenses (including costs currently passed through to customers) increased by $506 million, or 26%, in the six months ended June 30, 2011, as compared to the same period in 2010. Costs that are passed through to customers and do not impact net income increased by $134 million, primarily due to in the cost of public purpose programs and pension plan contributions. Excluding costs currently passed through to customers, operating and maintenance expenses increased by $372 million. This increase was attributable to a number of factors, including $118 million in labor and other maintenance-related costs, the majority of which is associated with the scheduled refueling outage at Diablo Canyon and more severe storms in 2011; $31 million for legal and regulatory matters, primarily related to the Rancho Cordova accident (see “CPUC Investigation Regarding Rancho Cordova Accident” below); $22 million for higher environmental remediation costs, primarily related to the Utility’s natural gas compressor site located near Hinkley, California; and increases in other expenses. Additionally, the Utility incurred costs of $125 million in connection with matters described below in “Natural Gas Pipeline Matters.” This amount included $126 million of pipeline-related costs associated with the Utility’s natural gas pipeline system as described above; a $59 million increase to the provision for third-party liability claims related to the San Bruno accident, reflecting the outcome of settlements and changes in estimates and assumptions regarding these claims; partially offset by $60 million for insurance recoveries related to third-party liability costs. (See Note 10 of the Notes to the Condensed Consolidated Financial Statements.)

The Utility currently estimates that it will incur costs associated with its natural gas pipeline system ranging from $350 million to $550 million in 2011, of which it has incurred $126 million as of June 30, 2011. The Utility estimates that it will incur costs during the remaining six months of the year, primarily to perform pressure tests and other tests on portions of its natural gas pipeline system, complete its review and validation of pipeline records, respond to regulatory proceedings and investigations, and to perform other activities related to the safety of its gas pipeline system. These cost estimates could change depending on the results of the Utility’s records review, the scope and timetable of the Utility’s implementation plan that it must file with the CPUC by August 26, 2011 (see “CPUC Rulemaking Proceeding” below), the outcome of the regulatory proceedings and investigations discussed below under “Natural Gas Pipeline Matters,” and new state or federal requirements that may be imposed on operators of natural gas transmission pipelines. PG&E Corporation and the Utility are uncertain what portion of these pipeline-related costs that the Utility may incur would be recoverable through rates and the timing of any such recovery.

Future operating and maintenance expenses also may be affected by the amount of third-party liability the Utility incurs as a result of the San Bruno accident. (See “Natural Gas Pipeline Matters” below and Note 10 of the Notes to the Condensed Consolidated Financial Statements.) Although the Utility considers it likely that a significant portion of the costs the Utility incurs for third-party claims will be recovered through insurance, it is unable to predict the amount and timing of additional insurance recoveries. Finally, the Utility may be required to pay fines or penalties as a result of the pending investigations discussed below under “Natural Gas Pipeline Matters” which may have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, or cash flows.

### Depreciation, Amortization, and Decommissioning

The Utility’s depreciation and amortization expense consists of depreciation and amortization on plant and regulatory assets, and decommissioning expenses associated with fossil fuel and nuclear plant decommissioning. The Utility’s depreciation, amortization, and decommissioning expenses increased by $124 million, or 26%, in the three months ended June 30, 2011, and $163 million, or 18%, in the six months ended June 30, 2011, as compared to the same period in 2010, primarily due to an increase in authorized capital additions and an increase in depreciation rates as authorized by the 2011 GRC and GT&S rate cases.

The Utility’s depreciation expense for future periods is expected to increase as a result of an overall increase in capital expenditures and the implementation of higher depreciation rates as authorized by the CPUC.

### Interest Income

In the three and six months ended June 30, 2011, the Utility’s interest income increased by less than $1 million, respectively, as compared to the same periods in 2010, due to fluctuations in various regulatory balancing accounts.

The Utility’s interest income in future periods will be primarily affected by changes in the balance of funds held in escrow pending resolution of the Chapter 11 disputed claims, changes in regulatory balancing accounts, and changes in interest rates. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements.)

### Interest Expense

In the three and six months ended June 30, 2011, the Utility’s interest expense increased by $5 million, or 3%, and $20 million, or 6%, respectively, as compared to the same periods in 2010. Interest costs rose as the Utility issued additional senior notes. The higher interest costs were partially offset by decreases in the outstanding balance of the energy recovery bonds. (See Note 4 of the Notes to the Condensed Consolidated Financial Statements.)

The Utility’s interest expense in future periods will be impacted by changes in interest rates, changes in the liability for Chapter 11 disputed claims, changes in regulatory balancing accounts and regulatory assets, and changes in the amount of debt outstanding as long-term debt matures and additional long-term debt is issued. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements and “Liquidity and Financial Resources” below.)

### Other Income, Net

In the three and six months ended June 30, 2011, the Utility’s other income (expense), net, increased by $15 million, and $38 million, respectively, as compared to the same periods in 2010 when the Utility incurred costs to support a California ballot initiative that appeared on the June 2010 ballot. The increases were partially offset by decreases in allowance for equity funds used during construction as the average balances of construction work in progress were lower as compared to the same periods in 2010.

### Income Tax Provision

The Utility’s income tax provision decreased by $7 million, or 4%, for the three months ended June 30, 2011, and $71 million, or 18% for the six months ended June 30, 2011, as compared to the same periods in 2010. The effective tax rates for the three months ended June 30, 2011 and 2010 were 34% and 37%, respectively. The effective tax rates for the six months ended June 30, 2011 and 2010 were 36% and 39%, respectively. The effective tax rates decreased in the three and six months ended June 30, 2011, as compared to the same periods in 2010 when the Utility incurred non tax-deductible lobbying expenses associated with a ballot initiative and reversed a deferred tax asset that had previously been recorded to reflect the future tax benefits attributable to the Medicare Part D subsidy after 2012, which was eliminated as part of the federal healthcare legislation passed during 2010.

### PG&E Corporation, Eliminations, and Other

### Operating Revenues and Expenses

PG&E Corporation’s revenues consist mainly of billings to its affiliates for services rendered, all of which are eliminated in consolidation. PG&E Corporation’s operating expenses consist mainly of employee compensation and payments to third parties for goods and services. Generally, PG&E Corporation’s operating expenses are allocated to affiliates. These allocations are made without mark-up and are eliminated in consolidation. PG&E Corporation’s interest expense relates to its 5.8% Senior Notes, and is not allocated to affiliates.

There were no material changes to PG&E Corporation’s operating income in the three and six months ended June 30, 2011, as compared to the same periods in 2010.

### LIQUIDITY AND FINANCIAL RESOURCES

### Overview

The Utility’s ability to fund operations depends on the levels of its operating cash flows and access to the capital and credit markets. The levels of the Utility’s operating cash and short-term debt fluctuate as a result of seasonal load and natural gas, volatility in energy commodity costs, collateral requirements related to price risk management activity, the timing and amount of tax payments or refunds, and the timing and effect of regulatory decisions and financings, among other factors. The Utility generally utilizes equity contributions from PG&E Corporation and long-term senior unsecured debt issuances to fund debt maturities and capital expenditures and to maintain its CPUC-authorized capital structure. The Utility relies on short-term debt, including commercial paper, to fund temporary financing needs. The CPUC authorizes the aggregate amount of long-term debt and short-term debt that the Utility may issue and authorizes the Utility to recover its related debt financing costs. The Utility has short-term borrowing authority of $4.0 billion, including $500 million that is restricted to certain contingencies.

PG&E Corporation’s ability to fund operations, make scheduled principal and interest payments, fund Utility equity contributions as needed for the Utility to maintain its CPUC-authorized capital structure, fund tax equity investments, and pay dividends primarily depends on the level of cash distributions received from the Utility and PG&E Corporation’s access to the capital and credit markets.

### Revolving Credit Facilities

The following table summarizes PG&E Corporation’s and the Utility’s revolving credit facilities at June 30, 2011:

*(in millions)*

| Termination Date | Facility Limit |  | Letters of Credit Outstanding | Cash Borrowings | Commercial Paper Backup | Availability |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| PG&E Corporation May 2016 | $300 | (1) | $- | $75 | $- | $225 |
| Utility May 2016 | 3,000 | (2) | 319 | - | 870 | 1,811 |
| **Total revolving credit facilities** | **$3,300** |  | **$319** | **$75** | **$870** | **$2,036** |

(1) Includes a $100 million sublimit for letters of credit and a $100 million commitment for “swingline” loans, defined as loans that are made available on a same-day basis and are repayable in full within 7 days.

(2) Includes a $1.0 billion sublimit for letters of credit and a $300 million commitment for swingline loans.

For the six months ended June 30, 2011, the average outstanding commercial paper balance was $838 million and the maximum outstanding balance during the quarter was $1.2 billion. In addition, for the six months ended June 30, 2011, the average outstanding borrowings on PG&E Corporation’s revolving credit facility was $32 million and the maximum outstanding balance during the quarter was $75 million. There were no cash borrowings on the Utility’s revolving credit facility in the six months ended June 30, 2011.

On May 31, 2011, PG&E Corporation entered into a $300 million revolving credit facility with a syndicate of lenders. This revolving credit facility replaced the $187 million revolving credit facility that PG&E Corporation entered into on February 26, 2007, as amended by the Amendment and Limited Consent Agreement, dated as of April 27, 2009. Also on May 31, 2011, the Utility entered into a $3.0 billion revolving credit facility with a syndicate of lenders. This revolving credit facility replaced the $1.9 billion revolving credit facility that the Utility entered into on February 26, 2007, as amended by the Amendment and Limited Consent Agreement, dated as of April 27, 2009, and the $750 million revolving credit facility that the Utility entered into on June 8, 2010. The revolving credit facilities have terms of five years and all amounts are due and payable on the facilities’ termination date, May 31, 2016. At PG&E Corporation’s and the Utility’s request and at the sole discretion of each lender, the facilities may be extended for additional periods. PG&E Corporation and the Utility have the right to replace any lender who does not agree to an extension under the respective agreements.

Subject to obtaining commitments from existing or new lenders and satisfaction of other specified conditions, PG&E Corporation and the Utility have the right to increase, in one or more requests, given not more frequently than once a year, the aggregate lenders’ commitments under the revolving credit facilities by up to $100 million and $500 million, respectively, in the aggregate for all such increases.

Borrowings under the revolving credit facilities (other than swingline loans) will bear interest based, at PG&E Corporation’s and the Utility’s election, on (1) a London Interbank Offered Rate (“LIBOR”) plus an applicable margin or (2) the base rate plus an applicable margin. The base rate will equal the higher of the following: the administrative agent’s announced base rate, 0.5% above the federal funds rate, or the one-month LIBOR plus an applicable margin. Interest is payable quarterly in arrears, or earlier for loans with shorter interest periods. PG&E Corporation and the Utility also will pay a facility fee on the total commitments of the lenders under the revolving credit facilities. The applicable margins and the facility fees will be based on PG&E Corporation’s and the Utility’s senior unsecured debt ratings issued by Standard & Poor’s Rating Services and Moody’s Investor Service. Facility fees are payable quarterly in arrears.

The revolving credit facilities include usual and customary covenants for revolving credit facilities of this type, including covenants limiting liens to those permitted under PG&E Corporation’s and the Utility’s senior note indentures, mergers, sales of all or substantially all of PG&E Corporation’s and the Utility’s assets, and other fundamental changes. In addition, the revolving credit facilities require that PG&E Corporation and the Utility maintain a ratio of total consolidated debt to total consolidated capitalization of at most 65% as of the end of each fiscal quarter. The $300 million revolving credit facility agreement also requires that PG&E Corporation must own, directly or indirectly, at least 80% of the common stock and at least 70% of the voting capital stock of the Utility. At June 30, 2011, PG&E Corporation and the Utility were in compliance with all covenants under each of the revolving credit facilities.

### 2011 Financings

On May 9, 2011, PG&E Corporation entered into an Equity Distribution Agreement pursuant to which PG&E Corporation’s sales agents may offer and sell, from time to time, PG&E Corporation common stock having an aggregate gross offering price of up to $288 million. This amount represents the approximate unissued amount of the $400 million program previously announced on November 4, 2010. Sales of the shares are made by means of ordinary brokers’ transactions on the New York Stock Exchange, or in such other transactions as agreed upon by PG&E Corporation and the sales agents and in conformance with applicable securities laws. For the six months ended June 30, 2011, PG&E Corporation issued 2,354,062 shares of common stock under the Equity Distribution Agreement for cash proceeds of $103 million, net of fees and commissions paid of $1 million. The proceeds from these issuances were used for general corporate purposes.

In addition, during the six months ended June 30, 2011, PG&E Corporation issued 3,853,288 shares of common stock upon the exercise of employee stock options and under its 401(k) plan and Dividend Reinvestment and Stock Purchase Plan, generating $154 million of cash.

### Utility

On May 13, 2011, the Utility issued $300 million principal amount of 4.25% Senior Notes due May 15, 2021. The proceeds from this issuance were used to repay a portion of outstanding commercial paper.

During the six months ended June 30, 2011, the Utility received cash contributions of $255 million from PG&E Corporation to ensure that the Utility had adequate capital to maintain the 52% common equity ratio authorized by the CPUC and to fund its capital expenditures.

### Future Financing Needs

The amount and timing of the Utility’s future debt and equity financings will depend on various factors, including:

- the amount of cash internally generated through normal business operations;
- the timing and amount of forecasted capital expenditures authorized by the CPUC;
- the timing of the resolution of the Chapter 11 disputed claims and the amount of interest on these claims that the Utility will be required to pay;
- the timing and amount of payments made to third parties in connection with the San Bruno accident, and the timing and amount of related insurance recoveries;
- the timing and amount of costs associated with the Utility’s natural gas pipeline system (see “Operating and Maintenance” above and “Natural Gas Pipeline Matters” below);
- the amount and timing of any fines or penalties imposed on the Utility in connection with the various regulatory proceedings and investigations related to the San Bruno accident and the Utility’s natural gas pipeline system;
- the amount of future tax payments (see the discussion of the Tax Relief Act under “Utility – Operating Activities” below); and
- the conditions in the capital markets, and other factors. (See Notes 9 and 10 of the Notes to the Condensed Consolidated Financial Statements.)

PG&E Corporation’s future financing needs depend primarily on the timing and amount of contributions made to the Utility to maintain the Utility’s 52% common equity ratio authorized by the CPUC. PG&E Corporation anticipates issuing equity in the future to meet the Utility’s additional equity needs as it incurs costs associated with the matters discussed below under “Natural Gas Pipeline Matters.” PG&E Corporation also may issue debt or equity in the future to fund future tax equity investments to the extent that internally generated funds are not sufficient. (See “PG&E Corporation” below.)

### Dividends

The following table summarizes PG&E Corporation’s and the Utility’s dividends paid during the six months ended June 30, 2011:

*(in millions)*

| PG&E Corporation |  |
| --- | ---: |
| Common stock dividends paid | $349 |
| **Utility** |  |
| Common stock dividends paid | $358 |
| Preferred stock dividends paid | 7 |

On June 15, 2011, the Board of Directors of PG&E Corporation declared dividends of $0.455 per share, totaling $183 million, of which $177 million was paid on July 15, 2011 to shareholders of record on June 30, 2011. The remaining $6 million was reinvested under the Dividend Reinvestment and Stock Purchase Plan.

On June 15, 2011, the Board of Directors of the Utility declared a dividend on its outstanding series of preferred stock, payable on August 15, 2011, to shareholders of record on July 29, 2011.

### Utility

### Operating Activities

The Utility’s cash flows from operating activities primarily consist of receipts from customers less payments of operating expenses, other than expenses such as depreciation that do not require the use of cash.

The Utility’s cash flows from operating activities for the six months ended June 30, 2011 and 2010 were as follows:

*(in millions)*

|  | Six months ended June 30, 2011 | 2010 |
| --- | ---: | ---: |
| Net income | $560 | $603 |
| Adjustments to reconcile net income to net cash provided by operating activities: |  |  |
| Depreciation, amortization, and decommissioning | 1,175 | 1,016 |
| Allowance for equity funds used during construction | (41) | (57) |
| Deferred income taxes and tax credits, net | 408 | (1) |
| Other | 22 | - |
| Effect of changes in operating assets and liabilities: |  |  |
| Accounts receivable | (1) | (81) |
| Inventories | 1 | (20) |
| Accounts payable | 140 | 4 |
| Income taxes receivable/payable | 66 | 475 |
| Other current assets and liabilities | (186) | (265) |
| Regulatory assets, liabilities, and balancing accounts, net | (324) | (263) |
| Other noncurrent assets and liabilities | 114 | (29) |
| **Net cash provided by operating activities** | **$1,934** | **$1,382** |

In the six months ended June 30, 2011, net cash provided by operating activities increased by $552 million compared to the same period in 2010 primarily due to a decrease of $279 million in net collateral paid by the Utility related to price risk management activities. Collateral payables and receivables are included in other noncurrent assets and liabilities and other current assets and liabilities within the Condensed Consolidated Statements of Cash Flows. The remaining changes in cash flows from operating activities consisted of fluctuations in activities within the normal course of business such as power purchases and customer billings.

On December 17, 2010, the Tax Relief Act was signed into law, which generally allows the Utility to accelerate depreciation by deducting up to 100% of the investment cost of certain qualified property placed into service during 2011 (or as late as 2012 under “phase out” or transition rules) and up to 50% of the investment cost of property placed into service in 2012 (or as late as 2013 under the phase out rules). As a result of the accelerated depreciation, the Utility expects that it will not make a federal tax payment in 2011. The Utility also expects that its 2012 federal tax payment will be reduced depending on the amount and timing of the Utility’s qualifying capital additions. (See “Regulatory Matters – CPUC Resolution Regarding the Tax Relief Act” below.)

Future cash flow from operating activities will be affected by the timing and amount of payments to be made to third parties in connection with the San Bruno accident, related insurance recoveries, any penalties that may be assessed, and costs associated with the Utility’s natural gas pipeline system. (See “Operating and Maintenance” above and “Natural Gas Pipeline Matters” below.)

### Investing Activities

The Utility’s investing activities consist of construction of new and replacement facilities necessary to deliver safe and reliable electricity and natural gas services to its customers. Cash used in investing activities depends primarily upon the amount and timing of the Utility’s capital expenditures, which can be affected by many factors, including the timing of regulatory approvals and the occurrence of storms and other events causing outages or damages to the Utility’s infrastructure. Cash used in investing activities also includes the proceeds from sales of nuclear decommissioning trust investments which are largely offset by the amount of cash used to purchase new nuclear decommissioning trust investments.

The Utility’s cash flows from investing activities for the six months ended June 30, 2011 and 2010 were as follows:

*(in millions)*

|  | Six months ended June 30, 2011 | 2010 |
| --- | ---: | ---: |
| Capital expenditures | $(1,897) | $(1,786) |
| Decrease in restricted cash | 198 | 50 |
| Proceeds from sales and maturities of nuclear decommissioning trust investments | 1,007 | 685 |
| Purchases of nuclear decommissioning trust investments | (969) | (696) |
| Other | 11 | 11 |
| **Net cash used in investing activities** | **$(1,650)** | **$(1,736)** |

Net cash used in investing activities decreased by $86 million in the six months ended June 30, 2011 compared to the same period in 2010. This decrease was primarily due to $191 million in restricted cash that was released from escrow in the six months ended June 30, 2011 for settled or withdrawn Chapter 11 disputed claims with no similar release in 2010. This decrease was partially offset by an increase in capital expenditures that was primarily due to the timing of payments.

Future cash flows used in investing activities are largely dependent on the timing and amount of capital expenditures. (See “Capital Expenditures” below for further discussion of expected spending and significant capital projects.)

### Financing Activities

The Utility’s cash flows from financing activities for the six months ended June 30, 2011 and 2010 were as follows:

*(in millions)*

|  | Six months ended June 30, 2011 | 2010 |
| --- | ---: | ---: |
| Net issuances of commercial paper, net of discount of $2 in 2011 and $1 in 2010 | $265 | $693 |
| Proceeds from issuance of long-term debt, net of discount and issuance costs of $2 in 2011 and $5 in 2010 | 298 | 295 |
| Short-term debt matured | - | (500) |
| Long-term debt matured | (500) | - |
| Energy recovery bonds matured | (191) | (182) |
| Preferred stock dividends paid | (7) | (7) |
| Common stock dividends paid | (358) | (358) |
| Equity contribution | 255 | 130 |
| Other | 13 | 9 |
| **Net cash provided by (used in) financing activities** | **$(225)** | **$80** |

In the six months ended June 30, 2011, net cash used in financing activities increased by $305 million compared to the same period in 2010. Cash provided by or used in financing activities is driven by the Utility’s financing needs, which depend on the level of cash provided by or used in operating activities and the level of cash provided by or used in investing activities. The Utility generally utilizes long-term senior unsecured debt issuances and equity contributions from PG&E Corporation to fund debt maturities and capital expenditures and to maintain its CPUC-authorized capital structure, and relies on short-term debt to fund temporary financing needs.

As of June 30, 2011, PG&E Corporation’s affiliates had entered into four tax equity agreements with two privately held companies to fund residential and commercial retail solar energy installations. Under these agreements, PG&E Corporation has agreed to provide lease payments and investment contributions of up to $398 million to these companies in exchange for the right to receive the benefits of local rebates, federal investment tax credits or grants, and a share of the customer payments made to these companies. As of June 30, 2011, PG&E Corporation had made total payments of $251 million under these tax equity agreements and received $99 million in benefits and customer payments. On April 14, 2011, PG&E Corporation borrowed $75 million under its $187 million revolving credit facility to fund the obligations under the tax equity agreements. On May 31, 2011, this borrowing was repaid and $75 million was borrowed under PG&E Corporation’s new $300 million revolving credit facility. (See Note 4 of the Notes to the Condensed Consolidated Financial Statements.) Lease payments, investment contributions, benefits, and customer payments received are included in cash flows from operating and investing activities within the Condensed Consolidated Statements of Cash Flows. PG&E Corporation’s financial exposure for these arrangements is generally limited to its lease payments and investment contributions to these companies.

In addition to the investments above, PG&E Corporation had the following material cash flows on a stand-alone basis for the six months ended June 30, 2011 and 2010: dividend payments, common stock issuances, and transactions between PG&E Corporation and the Utility.

### CONTRACTUAL COMMITMENTS

PG&E Corporation and the Utility enter into contractual commitments in connection with business activities. These future obligations primarily relate to financing arrangements (such as long-term debt, preferred stock, and certain forms of regulatory financing), purchases of electricity and natural gas for customers, purchases of transportation capacity, purchases of renewable energy, and the purchase of fuel and transportation to support the Utility’s generation activities. (Refer to the 2010 Annual Report, the “Liquidity and Financial Resources” section above and Notes 4 and 10 of the Notes to the Condensed Consolidated Financial Statements.)

### CAPITAL EXPENDITURES

Most of the Utility’s revenue requirements to recover forecasted capital expenditures are authorized in the GRC, TO rate cases, and GT&S rate cases. (See “Regulatory Matters” below.)

The Utility also collects additional revenue requirements to recover capital expenditures related to projects that have been specifically authorized by the CPUC, such as new power plants, gas or electric distribution projects, and the SmartMeterTM advanced metering infrastructure. As discussed below, the Utility could incur additional capital expenditures in the future if it acquires the Oakley Generation facility, a 586-megawatt (“MW”) generation facility being constructed in Oakley, California.

In addition, the Utility expects that it will make additional capital investments over the next 20 years related to the deployment of the “Smart Grid” in California. As required by California state law enacted in 2009, the Utility filed an application with the CPUC on June 30, 2011 requesting that the CPUC approve the Utility’s Smart Grid deployment plan. The Utility’s plan defines the Smart Grid as a modernized electric infrastructure which integrates advanced communications and control systems to create a highly automated, responsive, and resilient power delivery system that will both optimize service and empower customers to make informed energy decisions. If approved by the CPUC, the Utility’s plan will provide policy guidance for future Utility investments in Smart Grid projects and initiatives to be reviewed in future CPUC proceedings. The Utility’s application does not request approval or funding for specific Smart Grid projects or programs.

### Proposed Oakley Generation Facility

In December 2010, the CPUC approved a purchase and sale agreement between the Utility and Contra Costa Generating Station LLC for the development and construction of the Oakley Generation Facility. Under the CPUC’s decision, if the Utility acquires the facility from the developer before January 1, 2016, the Utility’s associated costs cannot be recovered through rates until after January 1, 2016. Instead, the Utility’s ability to recover its costs before January 1, 2016 would depend on the amount of electric generation revenues produced by the facility. If the Utility acquires the facility after January 1, 2016, the Utility’s associated costs would be recoverable through rates. Under the current purchase and sale agreement the Utility could be required to acquire the facility before January 1, 2016. The Utility and the developer are negotiating an amendment to the agreement to delay the acquisition until January 1, 2016 or later and to reflect the possibility that the facility may be operated before the acquisition. The Utility is uncertain whether and when the proposed amendment will be executed.

On May 20, 2011, the California Energy Commission (“CEC”) authorized the developer to construct the facility and construction began in late June. Various environmental groups have filed an appeal of the CEC’s decision with the California Supreme Court. On May 26, 2011, the CPUC denied various applications for rehearing that had been filed with respect to the CPUC’s December 2010 decision. The CPUC’s denial of the rehearing applications has been appealed to both the California Supreme Court and the California Court of Appeal. The Utility is unable to predict the outcome of these appeals.

### OFF-BALANCE SHEET ARRANGEMENTS

PG&E Corporation and the Utility do not have any other off-balance sheet arrangements that have had, or are reasonably likely to have, a current or future material effect on their financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures, or capital resources, other than those discussed in Note 2 (PG&E Corporation’s tax equity financing agreements) and Note 10 (the Utility’s commodity purchase agreements) of the Notes to the Condensed Consolidated Financial Statements.

### CONTINGENCIES

PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to Chapter 11 disputed claims, guarantees, regulatory proceedings, nuclear operations, legal matters, environmental compliance and remediation, and tax matters. (See Notes 9 and 10 of the Notes to the Condensed Consolidated Financial Statements.)

### NATURAL GAS PIPELINE MATTERS

Following the San Bruno accident on September 9, 2010, various regulatory proceedings, investigations, and civil lawsuits were commenced, as discussed in the 2010 Annual Report. The current status of these matters as well as new developments are summarized here and described more fully below:

- The NTSB began its formal investigation of the San Bruno accident on September 10, 2010. The NTSB is responsible for investigating the San Bruno accident, determining the probable cause of the pipeline rupture, and making recommendations to prevent similar accidents from occurring. The NTSB has issued several public statements and reports and held fact-finding hearings in Washington, D.C. in early March but has not made a final determination of the probable cause of the pipeline rupture. The NTSB has stated that it expects to issue its report by September 30, 2011. PG&E Corporation and the Utility are currently unable to predict the outcome of the investigation.
- The CPUC appointed an independent review panel to investigate the San Bruno accident. On June 8, 2011, the independent review panel issued its report containing the panel’s findings and recommendations to ensure such an accident is not repeated. (See “Report of CPUC’s Independent Review Panel” below.)
- In November 2010, the CPUC also began an investigation of the Rancho Cordova accident that occurred on December 24, 2008. On June 20, 2011, the Utility and the CPUC’s Consumer Protection and Safety Division (“CPSD”) requested that the CPUC approve a stipulation to resolve the investigation including a proposal that the Utility pay a $26 million penalty. (See “CPUC Investigation Regarding Rancho Cordova Accident” below.)
- On February 24, 2011, the CPUC initiated a formal investigation into the adequacy of the Utility’s gas transmission pipeline recordkeeping practices for its gas transmission system, and in particular for the pipeline involved in the San Bruno accident. During the quarter ended June 30, 2011, the Utility submitted extensive information to the CPUC about the Utility’s pipeline records. (See “CPUC Investigation Regarding Utility’s Facilities Records for its Natural Gas Pipelines” below.)
- On February 24, 2011, the CPUC also opened a rulemaking proceeding in order to develop and adopt safety-related changes to its regulation of natural gas transmission and distribution pipelines in California. On June 9, 2011, the CPUC ordered each California natural gas transmission pipeline operator to submit an implementation plan by August 26, 2011 that describes the operator’s plan to either pressure test or replace those pipeline segments that have never been pressure tested or that lack sufficient detail related to the performance of a test. (See “CPUC Rulemaking Proceeding” below.)
- On June 9, 2011, the Utility received notification that representatives from the U.S. Department of Justice, the California Attorney General’s Office, and the San Mateo County District Attorney’s Office are conducting an investigation of the San Bruno accident. (See “Criminal Investigation Regarding San Bruno Accident” below.)
- In June 2011, the CPSD informed the Utility that it had hired an independent consulting firm to conduct an audit of costs incurred by the Utility since 1996 on its natural gas transmission pipelines.
- On June 30, 2011, the Utility submitted a report to the CPUC containing the results of the Utility’s system-wide review of class location designations for its natural gas transmission pipelines. Under federal and state regulations, the class location designation of a pipeline is used to determine the pipeline’s maximum allowable operating pressure (“MAOP”) up to which it can be operated. This review of class location designations has indicated that some segments of pipe had or may have an MAOP higher than appropriate for their current class location designations. (See Part II, Item 1.A., Risk Factors, below.)
- Various civil lawsuits have been filed by residents of San Bruno in California state courts against PG&E Corporation and the Utility related to the San Bruno accident. These lawsuits seek compensation for personal injury and property damage claims and other damage claims. (See “Pending Lawsuits and Claims” below.)
- Each of the Boards of Directors of PG&E Corporation and the Utility has appointed a special review committee, composed solely of independent directors, to review the natural gas transmission and distribution practices used in the industry and by the Utility, and such other matters as the committees deem appropriate. The committees’ reviews, which commenced in late 2010, are expected to be completed by the third quarter of 2011.

The Utility currently expects that it will incur a material amount of costs associated with its natural gas pipeline system. The resolutions of these foregoing matters, including the amount of any civil or criminal fines or penalties, may have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows. (See “Impact on Operations” below.)

### Report of CPUC’s Independent Review Panel

On June 8, 2011, the CPUC’s independent review panel issued its report concluding that “the explosion of the pipeline at San Bruno was a consequence of multiple weaknesses in PG&E Corporation’s and the Utility’s management and oversight of the safety of its gas transmission system.” Among other findings, the panel found that the Utility’s natural gas pipeline integrity management program had several shortcomings and questioned whether the Utility embraced the spirit of the pipeline integrity regulations. The panel recommended that the Utility commission an independent operations and management audit of the gas transmission and gas distribution functions. It also recommended that the Utility ensure all individuals in top management, who have direct responsibility for managing the operation of the natural gas system, have thorough knowledge of gas transmission and distribution operations.

The Utility filed comments on the panel’s report stating that the Utility agreed with the panel’s overall conclusions and in principle with its 18 formal recommendations. Other parties filed comments to the panel’s report, including a suggestion that the deficiencies identified by the panel in the Utility’s management of its gas transmission system may also apply to its gas distribution system, and urged the CPUC to review the Utility’s gas distribution system as soon as possible.

There have been several recent management changes including the appointment of a new senior executive to lead the gas transmission and distribution function and the creation of a new senior executive position to lead the electric transmission and distribution function. Both of these executives report to the President of the Utility. In addition, PG&E Corporation is searching for a new chief executive officer following the retirement of Peter Darbee. (The executives who departed during the six months ended June 30, 2011 are entitled to certain payments which will not be recovered through rates.)

PG&E Corporation and the Utility are unable to predict how the CPUC will use the findings and recommendations contained in the report or whether additional investigations or proceedings will be commenced.

### CPUC Investigation Regarding Rancho Cordova Accident

The CPUC also is investigating a natural gas explosion and fire that occurred on December 24, 2008 in a house located in Rancho Cordova, California. On February 17, 2011, the Utility submitted a report to the CPUC in which the Utility stated that it agreed with the NTSB’s conclusions about the probable cause of the accident. On June 20, 2011, the Utility and the CPSD requested that the CPUC approve a stipulated resolution of the CPUC’s investigation of the Rancho Cordova accident. Under the stipulation, the Utility has admitted to violations of law and has agreed to pay a penalty of $26 million to the State General Fund within twenty days after CPUC approval. The Utility also agreed to pay the CPSD’s expenses and other costs incurred in connection with the investigation and that it will not seek to recover the penalty or the amounts paid to the CPSD from customers. On July 29, 2011, a hearing was held before a CPUC administrative law judge regarding the reasonableness of the stipulation between the Utility and the CPSD. The administrative law judge will issue a decision to approve or reject the stipulation within 60 days.

As of June 30, 2011, approximately $26 million was accrued as a liability for penalties associated with the Rancho Cordova accident in PG&E Corporation’s and the Utility’s Condensed Consolidated Balance Sheets.

### CPUC Investigation Regarding Utility’s Facilities Records for its Natural Gas Pipelines

On February 24, 2011, the CPUC issued an order instituting a formal investigation (“OII”) pertaining to safety recordkeeping for the Utility’s gas transmission pipeline (Line 132) that ruptured in the San Bruno accident, as well as for its entire gas transmission system. The CPUC stated that in deciding to issue the OII, it had relied on the NTSB’s public preliminary reports issued in connection with its investigation of the San Bruno accident, the NTSB’s January 3, 2011 urgent safety recommendations regarding the importance of accurate pipeline records in calculating maximum safe operating pressures, and other NTSB statements. After the NTSB has completed its investigation and issued a final report, the CPUC also will consider other possible violations of law, besides recordkeeping, associated with the Utility’s transmission lines and with Line 132 in particular.

The first phase of the CPUC’s investigation is limited to (1) whether the Utility’s gas transmission pipeline recordkeeping and its knowledge of its own transmission gas system (and, in particular, the San Bruno pipeline) was deficient and unsafe, and (2) whether the Utility thereby violated applicable law and safety standards. In particular, this phase will determine, among other matters, whether the San Bruno tragedy would have been preventable by the exercise of safe procedures and/or accurate and effective technical recordkeeping in compliance with the law. The CPUC will consider whether the Utility’s approach to recordkeeping stems from corporate-level management policies and practices and, if so, whether those management practices and policies contributed to recordkeeping violations that adversely affected safety. The Utility has reviewed its records dating back to 1955 and has provided extensive information to the CPUC about the regulatory history applicable to gas transmission and recordkeeping practices, the Utility’s recordkeeping policies and practices, actions the Utility has taken since 1955 to promote safety on its gas transmission pipeline system, and safety risk assessments.

If the CPUC determines that the Utility violated gas safety recordkeeping requirements, the CPUC will schedule a later phase or phases to determine whether penalties are warranted, and if so the amount of such penalties. If the CPUC determines that the Utility violated applicable requirements, the CPUC could impose penalties on the Utility of up to $20,000 per day, per violation.

PG&E Corporation and the Utility are unable to estimate a possible loss or range of loss associated with any penalties that may be imposed by the CPUC on the Utility.

### Criminal Investigation Regarding San Bruno Accident

On June 9, 2011, the Utility was notified that representatives from the U.S. Department of Justice, the California Attorney General’s Office, and the San Mateo County District Attorney’s Office, are conducting an investigation of the San Bruno accident. The Utility will cooperate fully with the investigation. The investigation is in the early stages and PG&E Corporation and the Utility are unable to estimate a possible loss or range of loss associated with any criminal fines or penalties that may be imposed on the Utility.

### CPUC Rulemaking Proceeding

On June 9, 2011, the CPUC issued an order that requires each California natural gas transmission pipeline operator to develop an implementation plan to either pressure test or replace those pipeline segments that have never been pressure tested or that lack sufficient detail related to the performance of a test. The Utility’s implementation plan will supersede the Utility’s proposed Pipeline 2020 initiatives. (See the discussion of the proposed Pipeline 2020 program in the 2010 Annual Report.) The CPUC recognizes that the implementation plans will span several years and involve significant costs. The implementation plans are required to include:

- a priority-ranked schedule for pressure testing of pipeline segments based on risk assessment and maintaining service reliability;
- interim safety enhancement measures, such as increased patrols and leak surveys or pressure reductions;
- criteria on which pipeline segments are identified for replacement instead of pressure testing; and
- consideration for retrofitting pipeline to allow for in-line inspection tools and improved shut-off valves.

Each implementation plan must include specific capital and expense estimates and anticipated rate impacts. In addition, the Utility’s plan must include a ratemaking proposal to allocate costs between ratepayers and shareholders. The Utility has filed a request in the rulemaking proceeding for permission to establish a memorandum account to track costs for potential future rate recovery. It is uncertain when the CPUC will rule on this request. Costs that the Utility incurs before the memorandum account has been established may not be recoverable through rates. The implementation plans must be filed with the CPUC by August 26, 2011. The procedural schedule calls for hearings to consider the implementation plans be held in November 2011. After the NTSB issues its report, a prehearing conference will be held to determine the schedule for the remainder of the proceeding.

Additionally, the CPUC has not yet acted on the proposed stipulation to resolve an order to show cause (“OSC”) that the CPUC issued on March 24, 2011 to require the Utility to show why it should not be penalized for failing to present evidence that it “aggressively and diligently searched” its pipeline records as previously ordered. As part of the proposed stipulation, the Utility and the CPSD had proposed a detailed compliance plan, including specific milestones, for the Utility to complete its records review and MAOP validation using an MAOP validation methodology that would supplement specific documentation with an engineering analysis, excavation and field testing, and assumptions about certain pipeline components, such as fittings and elbows, based on the material specifications at the time those materials were procured. In its June 9, 2011 order, the CPUC ordered the Utility to continue its efforts to determine the MAOP of its pipelines, as contemplated in the proposed compliance plan, while the Utility develops the more detailed implementation plan required to be submitted to the CPUC on August 26, 2011. Under the proposed stipulation the Utility would pay a penalty of $3 million. If there is an unexcused failure by the Utility to meet any of the milestones, the Utility would be required to pay additional penalties, up to $3 million, as the CPUC determines. The penalties would not be recoverable through rates. The proposed stipulation does not constitute an admission by the Utility of any fact alleged in the OSC or of any non-compliance or other violation of any order, rule, regulation or law.

### Pending Lawsuits and Other Claims

In addition to the pending investigations and proceedings discussed above, approximately 90 tort lawsuits on behalf of approximately 320 plaintiffs, including two class action lawsuits, have been filed against PG&E Corporation and the Utility in connection with the San Bruno accident. The lawsuits seek compensation for personal injury, property damage, and other relief. The Utility has a recorded a total provision of $279 million ($220 million in 2010 and $59 million in 2011) for estimated third-party claims, and has made payments of $68 million as of June 30, 2011. The Utility estimates that it may record as much as an additional $121 million for third-party claims, for a total possible loss of $400 million. As more information becomes known, including information resulting from the pending investigations and the settlement of claims, estimates and assumptions regarding the amount of third-party liability incurred in connection with the San Bruno accident may change. (See Note 10 to the Condensed Consolidated Financial Statements.)

The Utility has liability insurance from various insurers who provide coverage at different policy limits that are triggered in sequential order or “layers.” Generally, as the policy limit for a layer is exhausted the next layer of insurance becomes available. The aggregate amount of this insurance coverage is approximately $992 million in excess of a $10 million deductible. During the quarter ended June 30, 2011, the Utility submitted insurance claims to certain insurers for the lower (or “primary”) layers and recognized $60 million for insurance recoveries that have been deemed probable under applicable accounting standards. Although the Utility currently considers it likely that a significant portion of the costs incurred for third-party claims related to the San Bruno accident will ultimately be recovered through this insurance, it is unable to predict the amount and timing of additional insurance recoveries. (See Note 10 to the Condensed Consolidated Financial Statements.)

Additionally, a purported shareholder derivative lawsuit was filed following the San Bruno accident to seek recovery on behalf of PG&E Corporation and the Utility for alleged breaches of fiduciary duty by officers and directors, among other claims. The judge has ordered that the parties not take any action with respect to the derivative lawsuit until further order of the court.

In February 2011, PG&E Corporation rejected a shareholder demand that had been made following the San Bruno accident demanding that the PG&E Corporation Board of Directors (“Board”) (1) institute an independent investigation of the San Bruno accident and related alleged safety issues; (2) seek recovery of all costs associated with such issues through legal proceedings against those determined to be responsible, including board members, officers, other employees, and third parties; and (3) adopt corporate governance initiatives and safety programs. The Board authorized PG&E Corporation to reject the demand as had been recommended by the Evaluation Committee, a committee composed of independent directors that had been appointed to evaluate the demand and recommend how the Board should respond. The Board also reserved the right to commence further investigation or litigation regarding the San Bruno accident if the Board deems such investigation or litigation appropriate.

### Impact on Operations

The Utility estimates that it will incur costs associated with its natural gas pipeline system ranging from $350 million to $550 million in 2011. The Utility has incurred $75 million and $126 million for the three and six months ended June 30, 2011, and estimates that the remaining six months of the year will primarily include costs to perform pressure tests and other tests on portions of its natural gas pipeline system, complete its review and validation of pipeline records, respond to regulatory proceedings and investigations, and to perform other activities related to the safety of its gas pipeline system. These cost estimates could change depending on the scope and timetable of the final implementation plan approved by the CPUC in the rulemaking proceeding discussed above, the outcome of the regulatory proceedings and investigations discussed above, and new state or federal requirements that may be imposed on operators of natural gas transmission pipelines.

Additionally, as part of the implementation plan to be filed with the CPUC described above, the Utility is required to submit a proposal to allocate costs between shareholders and ratepayers to the CPUC to be considered in the CPUC’s rulemaking proceeding. PG&E Corporation and the Utility are uncertain what portion of the costs that the Utility incurs under the implementation plan or to respond to orders, recommendations, or new legislative requirements, would be recoverable through rates and the timing of any such recovery.

As described above, future operating and maintenance expenses also may be affected by the amount of third-party liability the Utility incurs as a result of the San Bruno accident. Although the Utility currently considers it likely that a significant portion of the costs incurred for third-party claims will ultimately be recovered through this insurance, it is unable to predict the amount and timing of additional insurance recoveries.

Finally, PG&E Corporation and the Utility may be required to pay fines or penalties which may have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, or cash flows.

### REGULATORY MATTERS

The Utility is subject to substantial regulation by the CPUC, the FERC, the NRC and other federal and state regulatory agencies. Significant regulatory developments that have occurred since the 2010 Annual Report was filed with the Securities and Exchange Commission (“SEC”) are discussed below.

### 2011 General Rate Case Application

On May 5, 2011, the CPUC issued a final decision in the 2011 GRC to authorize the Utility’s revenue requirements for 2011 through 2013 for its costs to own and operate its electric and natural gas distribution and electric generation operations. The final decision approves the unopposed October 15, 2010 settlement agreement among the Utility, the CPUC’s Division of Ratepayer Advocates, The Utility Reform Network, Aglet Consumer Alliance, and nearly all other intervening parties.

The CPUC authorized a total 2011 revenue requirement of approximately $6.0 billion, which reflects an overall increase of $450 million, or 8.1%, over the total 2010 authorized amount of $5.6 billion. The authorized increase for 2011 is comprised of $237 million for electric distribution, $47 million for gas distribution, and $166 million for electric generation. The authorized increase also includes $55 million for the recovery of financing costs and the accelerated return of capital associated with conventional meters that have been replaced by SmartMeterTM devices. PG&E Corporation’s and the Utility’s financial results for the three and six months ended June 30, 2011 reflect the additional authorized base revenues from January 1, 2011. (See “Results of Operations” above.)

The CPUC decision also authorizes attrition increases of $180 million for 2012 and $185 million for 2013. Additionally, the final decision authorizes the Utility to request incremental revenue to recover state and federal income taxes related to the accelerated depreciation of the conventional meters. On July 7, 2011, the Utility filed its request for incremental revenue of $15 million over the 2011-2013 time period and expects the CPUC to act on its request later this year.

The CPUC decision also requires the Utility to file annual reports with the CPUC containing information about the Utility’s budgeted expense and capital expenditures, its recorded expenditures, and an explanation for differences between budgeted and recorded expenditures. In the Utility’s next GRC, expected to cover the period from January 1, 2014 through

December 31, 2016, the Utility will be required to describe and justify the reprioritization of work activities and projects or the deferral of costs contemplated in the settlement agreement.

Additionally, on May 26, 2011, the CPUC adopted modifications for the electric residential service rate design portion of the Utility’s 2011 GRC proceeding. The decision changed the relative share of revenues billed and collected among lower-versus-higher usage customers, which is expected to result in lower bills and less volatility for customers in higher tiers and slightly higher bills for customer in lower tiers.

### Electric Transmission Owner Rate Cases

On April 28, 2011, the Utility requested the FERC to approve an uncontested settlement of the Utility’s electric TO rate case. The settlement, if approved, will increase the annual retail revenue requirement from $875 million to $934 million with rates effective as of March 1, 2011. The Utility has recorded adequate reserves to refund customers the difference between revenues collected at the higher as-filed rates and the rates included in the settlement since March 1, 2011. It is expected that the FERC will act on the settlement before the end of 2011.

### 2011 Gas Transmission and Storage Rate Case

On April 14, 2011, the CPUC issued a final decision that approves the settlement agreement, known as the Gas Accord V Settlement Agreement (“Gas Accord V”), entered into among the Utility and other parties to determine the rates and terms and conditions of the Utility’s gas transmission and storage services for a four-year period beginning January 1, 2011. The decision also resolves several objections raised by the other two California gas utilities.

The CPUC authorized a 2011 natural gas transmission and storage revenue requirement of $514 million, an increase of $52 million over the 2010 adopted revenue requirement. PG&E Corporation’s and the Utility’s financial results for the three and six months ended June 30, 2011 reflect the additional authorized base revenues from January 1, 2011. (See “Results of Operations” above.)

With attrition increases authorized by the decision, the Utility’s natural gas transmission and storage revenue requirements for 2012, 2013, and 2014 will be $541 million, $565 million, and $582 million, respectively. The Utility also has been authorized to recover (through natural gas transmission and storage rates) revenue requirements for other costs, such as the cost of electricity used to operate natural gas compressor stations and other costs, that are determined in the Utility’s 2011 GRC or other Utility regulatory proceedings.

The decision also requires the Utility to file a semi-annual safety report, beginning October 1, 2011, with the CPUC’s Energy Division and the CPSD to provide details about the Utility’s use of funds budgeted for pipeline safety, reliability and integrity projects and activities, including an explanation of whether the Utility has under-spent or over-spent funds. The reports will provide CPUC staff with the necessary details to: (1) monitor what storage and pipeline-related safety, reliability, and integrity capital projects and maintenance activities are being undertaken by the Utility and the amounts spent on such activities, (2) determine whether projects that have been identified by the Utility with high risk assessments are being carried out or whether other higher risk projects have been undertaken instead, (3) determine the Utility’s rationale for reprioritization of projects, and (4) monitor the status of the Utility’s compliance with federal regulations.

Finally, on July 14, 2011, the CPUC issued a decision in the “safety phase” of the GT&S rate case. The decision requires the Utility to offer maps of gas transmission facilities and provide free training to fire departments and other emergency response agencies, verify and submit inspection records to the CPUC for pipeline shutoff valves, and expand customer outreach to promote awareness of gas safety issues, among other required actions. The Utility must fund these activities with the revenues authorized in the Gas Accord V.

### Energy Efficiency Programs and Incentive Ratemaking

On June 27, 2011, the Utility requested that the CPUC approve an incentive award of $32 million based on the energy savings attributable to the Utility’s energy efficiency programs in 2009. The CPUC may issue a decision by December 2011 or early 2012.

On June 30, 2011, the California Governor signed Senate Bill 87 (“SB 87”) into law, which includes a provision that allows the transfer of up to $155 million from the statewide gas-consumption surcharge fund to the California General State Fund in fiscal 2011 and 2012. The surcharge is collected by the Utility, San Diego Gas and Electric Company, and Southern California Gas Company to help fund gas public purpose programs, including energy efficiency programs. To address the shortfall that would result if the transfer to the General Fund is made, the utilities have requested that the CPUC permit the utilities to use unspent funds from prior program years and otherwise manage 2011 and 2012 program expenditures to absorb the shortfall. PG&E Corporation and the Utility are unable to predict how or when the CPUC may act on the utilities’ request but they do not expect that the implementation of SB 87 would have a material effect on their financial condition or results of operations.

Finally, it is uncertain whether an incentive ratemaking mechanism for the 2010 through 2012 energy efficiency program cycle and future program years will continue. Although a proposed decision was issued on November 15, 2010 that recommended modifications to the mechanism for the 2010 through 2012 program cycle, the proposed decision was withdrawn from the CPUC’s consideration on April 13, 2011. On July 28, 2011, the CPUC issued a decision to extend the statutory deadline for addressing modifications to the mechanism to October 13, 2011.

### CPUC Resolution Regarding the Tax Relief Act

On April 14, 2011, the CPUC adopted a resolution establishing a one-way memorandum account for certain rate-regulated utilities, including the Utility, to record the net change in the cost of providing utility service associated with the Tax Relief Act. The CPUC adopted an amended resolution on June 23, 2011, that primarily clarified certain language in the April 14, 2011 resolution.

The Tax Relief Act generally allows the Utility to accelerate depreciation by deducting up to 100% of the investment cost of certain qualified property placed into service during 2011 (or as late as 2012 under “phase out” or transition rules) and up to 50% of the investment cost of certain qualified property placed into service in 2012 (or as late as 2013 under the phase out rules). Amounts that are not subject to 50% or 100% acceleration will be recovered under normal tax depreciation lives and methods. As a result of the accelerated depreciation, the Utility’s federal tax payments are expected to be lower. (See “Liquidity and Financial Resources” above.) The resolution authorizes the Utility to use the tax savings to invest in certain additional capital infrastructure, not otherwise funded through rates.

The memorandum account will track: (1) the reduction in revenue requirements that is due to lower rate base resulting from deferred tax liabilities related to the accelerated federal tax depreciation, (2) the increase in revenue requirements associated with incremental eligible capital investments that meet certain CPUC guidelines as described in the resolution, and (3) other applicable reductions and increases in revenue requirements as defined in the resolution. The memorandum account will be applicable to CPUC-jurisdictional assets only; however, it is expected to exclude investments that have separate ratemaking treatment such as the Utility’s program to install an advanced metering system. The net benefits of the Tax Relief Act related to those excluded investments will automatically flow to customers under existing balancing account mechanisms. The memorandum account will be in effect for capital investments (other than those related to natural gas transmission operations) until 2014, the test year of the Utility’s next GRC. The memorandum account will be in effect for capital investments related to natural gas transmission operations until 2015, the test year for the Utility’s next GT&S rate case. In each rate case, the CPUC will determine the disposition of the memorandum account.

### Deployment of SmartMeterTM Technology

The CPUC has authorized the Utility’s program to install approximately 10 million advanced electric and gas meters throughout the Utility’s service territory. As of June 30, 2011, the Utility has installed 8.2 million meters. The CPUC has authorized the Utility to recover $2.3 billion in estimated project costs. Absent CPUC authorization, costs that exceed $2.3 billion will not be recoverable through rates. As of June 30, 2011, the Utility has incurred costs of $2.1 billion. The Utility has also recorded a provision of $36 million as of June 30, 2011 and December 31, 2010, representing the current forecast of capital-related costs that are expected to exceed the CPUC-authorized cost cap and that therefore are not currently recoverable through rates. The Utility will update its forecasts as the project continues and may incur additional non-recoverable costs.

On March 24, 2011, the Utility filed an application with the CPUC seeking approval of the Utility’s proposal to provide residential customers the option to turn off the radios in their gas and electric SmartMeter™ devices to disable the radio frequency (“RF”) communications used in the wireless meters. The Utility requested that the CPUC authorize electric and gas revenue requirements totaling $84.4 million through 2013 to recover the Utility’s estimated costs to provide the “radio-off” option which would be collected through fees charged to customers who choose the radio-off option. PG&E Corporation and the Utility are unable to predict whether the CPUC will approve the Utility’s proposal.

Additionally, on April 11, 2011, the Kern County Superior Court in Bakersfield, California dismissed the pending class action complaint that had alleged that the SmartMeter™ system generated inaccurate bills and led to overcharges, among other allegations.

### Diablo Canyon

The NRC operating license for Diablo Canyon Unit 1 expires in November 2024 and the NRC operating license for Diablo Canyon Unit 2 expires in August 2025. On November 24, 2009, the Utility filed an application to request the NRC to renew each of the operating licenses for Diablo Canyon for 20 years, until November 2044 for Unit 1 and August 2045 for Unit 2. The license renewal process is expected to take several years as the NRC holds public hearings and conducts safety and environmental analyses and site audits. The Utility’s application has been challenged by local environmental and anti-nuclear power organizations and the NRC is considering whether to admit their contentions for further review in the renewal process.

Following the March 2011 earthquake and tsunami that caused significant damage to nuclear facilities in Japan, the Utility requested the NRC to delay taking final action on the Utility’s relicensing application until after the Utility completes additional seismic studies. On May 31, 2011, the NRC granted the Utility’s April 11, 2011 request to delay taking final action on the Utility’s renewal application until after the Utility completes additional seismic studies. The NRC stated that it would issue its safety evaluation report but that it would delay its environmental impact report until after the Utility completes additional seismic studies and submits a report to the NRC addressing the results of those studies. The seismic studies are expected to be completed in 2014 or 2015. In early June 2011, the NRC issued its safety evaluation report and concluded that the Utility’s safety plan and processes meet federal requirements for longer-term operation of the plant. The NRC stated that its report may change depending on the results of the seismic studies being conducted.

In addition, the NRC is considering the recommendations made by a task force the NRC appointed after the earthquake and tsunami in Japan about how to improve safety at U.S. nuclear power plants and upgrade protection against earthquakes, floods and power losses. The NRC is expected to issue a report on the recommendations by January 2012. It is possible that the NRC will adopt additional regulations or issue orders to implement some of the task force’s recommendations.

PG&E Corporation and the Utility are unable to predict how long the NRC process will be delayed, whether the NRC will approve the license renewal application, whether the NRC will suspend the license renewal process, or whether the Utility will incur additional costs to comply with new regulations or orders before the NRC will approve license renewal.

Finally, in early August 2011, the NRC issued a letter finding that a report submitted by the Utility on January 7, 2011 to provide updated seismological information did not conform to current licensing standards. The Utility will shortly submit a license amendment request to address this omission. (See Item 1A. Risk Factors, below.)

### Other Matters

In addition to the ongoing investigations and proceedings related to the Utility’s gas pipeline system (see “Natural Gas Pipeline Matters” above), the following investigations were initiated during the quarter ended June 30, 2011:

On June 10, 2011, the CPUC commenced an investigation to determine whether the Utility should be penalized for failing to comply with the CPUC’s resource adequacy requirements for March, April, and July 2010. The CPSD recommends that the Utility be fined $7 million for these violations, as calculated in accordance with the penalty provisions previously adopted by the CPUC. The Utility is reviewing the allegations and will provide a response to the CPUC.

On June 10, 2011, the CPUC also issued an order to investigate whether the Utility failed to comply with the CPUC’s November 9, 2009 decision granting the Utility’s request for a permit to construct (“PTC”) a substation when the Utility removed an almond tree orchard to prepare the site for construction. If the CPUC determines that the Utility violated applicable requirements, the CPUC could impose penalties on the Utility of up to $20,000 per day, per violation. (See Part II, Item 1, Legal Proceedings, below.)

PG&E Corporation and the Utility are unable to predict the outcome of these investigations.

Additionally, on July 1, 2011, the Utility filed a report with the CPUC regarding the inspection of underground enclosures where some of the Utility’s electric distribution equipment is located. The Utility filed the report as required by CPUC General Order 165 which sets the schedules for electric inspection cycles and reporting requirements. In its report, the Utility stated that an internal investigation of underground enclosure inspections determined that it was probable that some underground enclosures, primarily located in the San Jose division of the Utility’s service territory, had not been inspected as had been reported previously by Utility employees and contractors. The Utility expects to complete inspections of these underground enclosures by August 31, 2011.

PG&E Corporation and the Utility are unable to predict the outcome of these matters, how they will affect the other regulatory proceedings and current investigations involving the Utility, or whether additional proceedings or investigations will be commenced that could result in further regulatory orders or the imposition of fines or penalties on the Utility.

### ENVIRONMENTAL MATTERS

The Utility’s operations are subject to extensive federal, state, and local laws and permits relating to the protection of the environment and the safety and health of the Utility’s personnel and the public. (See “Risk Factors” in the 2010 Annual Report.) These laws and requirements relate to a broad range of the Utility’s activities, including the discharge of pollutants into the air, water, and soil; the transportation, handling, storage, and disposal of spent nuclear fuel; remediation of hazardous wastes; and the reporting and reduction of carbon dioxide and other GHG emissions. Significant developments that have occurred since the 2010 Annual Report was filed with the SEC are discussed below.

### Climate Change

The California Global Warming Solutions Act of 2006 (also known as Assembly Bill 32 or “AB 32”) requires the gradual reduction of GHG emissions in California to 1990 levels by 2020 on a schedule beginning in 2012. In December 2008, the California Air Resources Board (“CARB”) adopted a scoping plan that contains recommendations for achieving the maximum technologically feasible and cost-effective GHG reductions to meet the 2020 reduction target, including a proposed cap-and-trade program. After the San Francisco County Superior Court ruled that the CARB had failed to comply with the California Environmental Quality Act (“CEQA”), the CARB issued its proposed report on June 13, 2011 of its further review and analysis of alternatives to the scoping plan measures. The CARB again concluded that a cap-and-trade program continues to be the preferred alternative. While the CARB’s appeal of the Superior Court’s order is pending, the CARB released its draft amended rules in July 2011 to implement the cap-and-trade program on a delayed basis by requiring compliance with the initial emissions cap beginning on January 1, 2013 instead of 2012.

It is uncertain when the CARB’s appeal will be decided and how the final decision will affect implementation of the cap-and-trade program.

### Renewable Energy Resources

On April 12, 2011, the California Governor signed new legislation establishing a new renewable portfolio standard (“RPS”) that increases the amount of renewable energy that retail sellers of electricity, such as the Utility, must deliver to their customers from at least 20% of their total retail sales by the end of 2010, as required by the prior law, to 33% of their total retail sales by the end of 2020. The new legislation will become effective 90 days after the current special session of the California Legislature ends. In response to the enactment of the new RPS law, the CARB abandoned its regulatory efforts to establish a 33% renewable energy standard.

Under the new RPS law the amount of electricity delivered from renewable energy resources must equal an average of 20% of total retail sales in 2011, 2012, and 2013; at least 25% of total retail sales by December 31, 2016; and at least 33% of total retail sales by December 31, 2020. The CPUC is authorized to set interim procurement targets for all other intervening years to reflect reasonable progress toward the statutory goals. The CPUC must determine by no later than January 1, 2012, the total procurement requirement (expressed as a percentage of total retail sales) for each retail seller, including the Utility, in each future compliance period (i.e., 2011-2013, 2014-2016, 2017-2020, and each year thereafter). The CPUC opened a new rulemaking proceeding in May 2011 to begin the implementation of the new RPS law. The Utility expects that the CPUC’s rulemaking will more definitively establish the Utility’s RPS compliance obligations, including a cap on the Utility’s total mandated RPS compliance expenditures.

The new RPS legislation creates three distinct categories of renewable energy products and imposes minimum or maximum procurement targets for each of these product categories that must be met in each future compliance period. With certain exceptions, these categorical requirements will only apply to contracts that are entered into after June 1, 2010. The new law imposes limits on the types of tradable renewable energy credits (“REC”s) that can be used to satisfy the categorical requirements and contains new restrictions on the Utility’s ability to carry forward (or “bank”) RPS volumes from contracts with terms of less than ten years. The new legislation requires that the CPUC approve applications for utility-owned renewable generation up to a certain energy-based cap, provided that the CPUC finds that the cost of the application is reasonable and meets other conditions. The costs of utility-owned renewable generation projects will be subject to traditional cost-of-service ratemaking treatment.

Under the new RPS law, the CPUC must waive enforcement of the RPS requirements as to any particular retail seller if it finds that certain specified circumstances beyond the control of the retail seller will prevent compliance and the retail seller has met certain other conditions, including demonstrating that the retail seller has taken all reasonable actions under its control to achieve full compliance.

Until the CPUC adopts regulations to implement the new law, it is uncertain how the CPUC’s regulations and decisions issued pursuant to the former 20% RPS statute will apply to the new RPS requirements.

### Water Quality

Section 316(b) of the federal Clean Water Act requires that cooling water intake structures at electric power plants, such as the nuclear generation facilities at Diablo Canyon, reflect the best technology available to minimize adverse environmental impacts. On April 20, 2011, the U.S. Environmental Protection Agency (“EPA”) published draft regulations that propose specific reductions for impingement (which occurs when larger organisms are caught on water filter screens) and provide a case-by-case site specific assessment to establish compliance requirements for entrainment (which occurs when organisms are drawn through the cooling water system). The proposed site specific assessment allows for the consideration of a variety of factors including social costs and benefits, energy reliability, land availability, and non-water quality adverse impacts. The draft regulations are subject to public comment and final regulations are not expected until July 2012.

The California Water Resources Control Board (“Water Board”) also has adopted a policy on once-through cooling. The policy, effective October 1, 2010, generally requires the installation of cooling towers or other significant measures to reduce the impact on marine life from existing power generation facilities by at least 85%. However, with respect to the state’s nuclear power generation facilities, the policy allows other compliance measures to be taken if the costs to install cooling towers are “wholly out of proportion” to the costs considered by the Water Board in developing its policy or if the installation of cooling towers would be “wholly unreasonable” after considering non-cost factors such as engineering and permitting constraints and adverse environmental impacts. The Utility believes that the costs to install cooling towers at Diablo Canyon, which could be as much as $4.5 billion, will meet the “wholly out of proportion” test. The Utility also believes that the installation of cooling towers at Diablo Canyon would be “wholly unreasonable.” If the Water Board disagreed and if the installation of cooling towers at Diablo Canyon were not technically or economically feasible, the Utility may be forced to cease operations at Diablo Canyon and may incur a material charge. Assuming the Water Board does not require the installation of cooling towers at Diablo Canyon, the Utility could incur significant costs to comply with alternative compliance measures or to make payments to support various environmental mitigation projects. The Utility would seek to recover such costs in rates. The Utility’s Diablo Canyon operations must be in compliance with the Water Board’s policy by December 31, 2024.

### Remediation

The Utility has been, and may be, required to pay for environmental remediation costs at sites where it is identified as a potentially responsible party under federal and state environmental laws. These sites include former manufactured gas plant (“MGP”) sites, current and former power plant sites, former gas gathering and gas storage sites, sites where natural gas compressor stations are located, current and former substations, service center and general construction yard sites, and sites currently and formerly used by the Utility for the storage, recycling, or disposal of hazardous substances. Under federal and California laws, the Utility may be responsible for remediation of hazardous substances even if it did not deposit those substances on the site. (See Note 10 of the Notes to the Condensed Consolidated Financial Statements for a discussion of estimated environmental remediation liabilities and Legal Proceedings of Part II, Item 1 for discussion of related legal proceedings.)

### LEGAL MATTERS

In addition to the provision made for claims related to the San Bruno accident, PG&E Corporation’s and the Utility’s Condensed Consolidated Financial Statements also include provisions for claims and lawsuits that have arisen in the ordinary course of business, regulatory proceedings, and other legal matters. See “Legal Matters” in Note 10 of the Notes to the Condensed Consolidated Financial Statements.

### RISK MANAGEMENT ACTIVITIES

The Utility and PG&E Corporation, mainly through its ownership of the Utility, are exposed to market risk, which is the risk that changes in market conditions will adversely affect net income or cash flows. PG&E Corporation and the Utility face market risk associated with their operations; their financing arrangements; the marketplace for electricity, natural gas, electric transmission, natural gas transportation, and storage; other goods and services; and other aspects of their businesses. PG&E Corporation and the Utility categorize market risks as “price risk” and “interest rate risk.” The Utility is also exposed to “credit risk,” the risk that counterparties fail to perform their contractual obligations.

The Utility actively manages market risks through risk management programs designed to support business objectives, discourage unauthorized risk-taking, reduce commodity cost volatility, and manage cash flows. The Utility uses derivative instruments only for non-trading purposes (i.e., risk mitigation) and not for speculative purposes. The Utility’s risk management activities include the use of energy and financial instruments such as forward contracts, futures, swaps, options, and other instruments and agreements, most of which are accounted for as derivative instruments. Some contracts are accounted for as leases.

On July 21, 2010, President Obama signed into law new federal financial reform legislation, the Dodd-Frank Wall Street Reform and Consumer Protection Act. PG&E Corporation and the Utility are evaluating the new legislation, and will review future regulations to assess compliance requirements as well as potential impacts on the Utility’s procurement activities and risk management programs.

### Price Risk

The Utility is exposed to commodity price risk as a result of its electricity and natural gas procurement activities, including the procurement of natural gas and nuclear fuel necessary for electricity generation and natural gas procurement for core customers. As long as the Utility can conclude that it is probable that its reasonably incurred wholesale electricity procurement costs and natural gas costs are recoverable, fluctuations in electricity and natural gas prices will not affect earnings but may impact cash flows. The Utility’s natural gas transportation and storage costs for core customers are also fully recoverable through a ratemaking mechanism.

The Utility’s natural gas transportation and storage costs for non-core customers may not be fully recoverable. The Utility is subject to price and volumetric risk for the portion of intrastate natural gas transportation and storage capacity that has not been sold under long-term contracts providing for the recovery of all fixed costs through the collection of fixed reservation charges. The Utility sells most of its capacity based on the volume of gas that the Utility’s customers actually ship, which exposes the Utility to volumetric risk.

The Utility uses value-at-risk to measure the shareholders’ exposure to price and volumetric risks resulting from variability in the price of, and demand for, natural gas transportation and storage services that could impact revenues due to changes in market prices and customer demand. Value-at-risk measures this exposure over a rolling 12-month forward period and assumes that the contract positions are held through expiration. This calculation is based on a 95% confidence level, which means that there is a 5% probability that the impact to revenues on a pre-tax basis, over the rolling 12-month forward period, will be at least as large as the reported value-at-risk. Value-at-risk uses market data to quantify the Utility’s price exposure. When market data is not available, the Utility uses historical data or market proxies to extrapolate the required market data. Value-at-risk as a measure of portfolio risk has several limitations, including, but not limited to, inadequate indication of the exposure to extreme price movements and the use of historical data or market proxies that may not adequately capture portfolio risk.

The Utility’s value-at-risk calculated under the methodology described above was $11 million at June 30, 2011. The Utility’s high, low, and average values-at-risk during the 12 months ended June 30, 2011 were $20 million, $8 million, and $12 million, respectively. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements for further discussion of price risk management activities.)

### Interest Rate Risk

Interest rate risk sensitivity analysis is used to measure interest rate risk by computing estimated changes in cash flows as a result of assumed changes in market interest rates. At June 30, 2011, if interest rates changed by 1% for all current PG&E Corporation and the Utility variable rate and short-term debt and investments, the change would affect net income for the next 12 months by $11 million, based on net variable rate debt and other interest rate-sensitive instruments outstanding.

### Credit Risk

The Utility conducts business with counterparties mainly in the energy industry, including other California investor-owned electric utilities, municipal utilities, energy trading companies, financial institutions, and oil and natural gas production companies located in the United States and Canada. If a counterparty fails to perform on its contractual obligation to deliver electricity or gas, then the Utility may find it necessary to procure electricity or gas at current market prices, which may be higher than the contract prices.

The Utility manages credit risk associated with its counterparties by assigning credit limits based on evaluations of their financial conditions, net worth, credit ratings, and other credit criteria as deemed appropriate. Credit limits and credit quality are monitored periodically. The Utility ties many energy contracts to master commodity enabling agreements that may require security (referred to as “Credit Collateral” in the table below). Credit Collateral may be in the form of cash or letters of credit. The Utility may accept other forms of performance assurance in the form of corporate guarantees of acceptable credit quality or other eligible securities (as deemed appropriate by the Utility). Credit Collateral or performance assurance may be required from counterparties when current net receivables and replacement cost exposure exceed contractually specified limits.

The following table summarizes the Utility’s net credit risk exposure to its counterparties, as well as the Utility’s credit risk exposure to counterparties accounting for greater than 10% net credit exposure, as of June 30, 2011 and December 31, 2010:

*(in millions)*

|  | Gross Credit Exposure Before Credit Collateral (1) | Credit Collateral | Net Credit Exposure (2) | Number of Wholesale Customers or Counterparties \>10% | Net Credit Exposure to Wholesale Customers or Counterparties \>10% |
| --- | ---: | ---: | ---: | ---: | ---: |
| June 30, 2011 | $288 | $16 | $272 | 2 | $200 |
| December 31, 2010 | $269 | $17 | $252 | 2 | $187 |

(1) Gross credit exposure equals mark-to-market value on physically and financially settled contracts, notes receivable, and net receivables (payables) where netting is contractually allowed. Gross and net credit exposure amounts reported above do not include adjustments for time value or liquidity.

(2) Net credit exposure is the Gross Credit Exposure Before Credit Collateral minus Credit Collateral (cash deposits and letters of credit). For purposes of this table, parental guarantees are not included as part of the calculation.

### CRITICAL ACCOUNTING POLICIES

The preparation of Condensed Consolidated Financial Statements in accordance with U.S. generally accepted accounting principles involves the use of estimates and assumptions that affect the recorded amounts of assets and liabilities as of the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. PG&E Corporation and the Utility consider their accounting policies for regulatory assets and liabilities, loss contingencies associated with environmental remediation liabilities and legal matters, asset retirement obligations, and pension plan and other postretirement plan obligations, to be critical accounting policies, due, in part, to their complexity and because their application is relevant and material to the financial position and results of operations of PG&E Corporation and the Utility, and because these policies require the use of material judgments and estimates. These policies and their key characteristics are discussed in detail in the 2010 Annual Report. In addition, management has made significant estimates and assumptions about accruals related to the San Bruno accident. Actual results may differ materially from these estimates and assumptions.

For the six months ended June 30, 2011, there were no changes in the methodology for computing critical accounting estimates and no material changes to the important assumptions underlying the critical accounting estimates.

### ACCOUNTING STANDARDS ISSUED BUT NOT YET ADOPTED

### Amendments to Fair Value Measurement and Disclosure Requirements

In May 2011, the Financial Accounting Standards Board (“FASB”) issued an accounting standards update that will clarify certain fair value measurement requirements. In addition, the accounting standards update will permit an entity to measure the fair value of a portfolio of financial instruments based on the portfolio’s net position, provided that the portfolio has met certain criteria. Furthermore, the accounting standards update will refine when an entity should, and should not, apply certain premiums and discounts to a fair value measurement. The accounting standards update will be effective prospectively for PG&E Corporation and the Utility beginning on January 1, 2012. PG&E Corporation and the Utility are currently evaluating the impact of the accounting standards update.

### Presentation of Comprehensive Income

In June 2011, the FASB issued an accounting standards update that will require an entity to present either (1) a statement of comprehensive income or loss or (2) a statement of other comprehensive income or loss. A statement of comprehensive income or loss would be comprised of a statement of income or loss with other comprehensive income and losses, total other comprehensive income or loss, and total comprehensive income or loss appended. A statement of other comprehensive income or loss would immediately follow a statement of income or loss and would be comprised of other comprehensive income and losses, total other comprehensive income or loss, and total comprehensive income or loss. In addition, under either approach, the accounting standards update will require an entity to present reclassifications between other comprehensive income or loss and net income or loss. Furthermore, the accounting standards update will prohibit an entity from presenting other comprehensive income and losses in a statement of equity. The accounting standards update will be effective retrospectively for PG&E Corporation and the Utility beginning on January 1, 2012. PG&E Corporation and the Utility are currently evaluating how to adopt the accounting standards update.

## Market risk

As filed, 578 characters.

PG&E Corporation’s and the Utility’s primary market risk results from changes in energy prices. PG&E Corporation and the Utility engage in price risk management activities for non-trading purposes only. Both PG&E Corporation and the Utility may engage in these price risk management activities using forward contracts, futures, options, and swaps to hedge the impact of market fluctuations on energy commodity prices and interest rates (see Item 2: Management’s Discussion and Analysis of Financial Condition and Results of Operations (MD&A) “Risk Management Activities” above).

## Controls and procedures

As filed, 1,551 characters.

Based on an evaluation of PG&E Corporation’s and the Utility’s disclosure controls and procedures as of June 30, 2011, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures were effective to ensure that information required to be disclosed by PG&E Corporation and the Utility in reports that the companies file or submit under the Securities Exchange Act of 1934 (“1934 Act”) is recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms. In addition, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures were effective in ensuring that information required to be disclosed by PG&E Corporation and the Utility in the reports that PG&E Corporation and the Utility file or submit under the 1934 Act is accumulated and communicated to PG&E Corporation’s and the Utility’s management, including PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

There were no changes in internal control over financial reporting that occurred during the quarter ended June 30, 2011 that have materially affected, or are reasonably likely to materially affect, PG&E Corporation’s or the Utility’s internal control over financial reporting.

## Risk factors

As filed, 9,500 characters.

The risk factors appearing in the 2010 Annual Report are supplemented and updated as follows:

***The ultimate amount of costs, penalties, and third –party liability the Utility incurs in connection with the San Bruno accident and the natural gas transmission pipeline matters described above could have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows.***

In addition to the pending NTSB investigation of the San Bruno accident, on February 24, 2011, the CPUC initiated a formal investigation pertaining to safety recordkeeping for the Utility’s gas transmission pipeline that ruptured in San Bruno on September 9, 2010, as well as for its entire gas transmission system. If the CPUC determines that the Utility violated safety law standards with respect to its gas system recordkeeping, the CPUC may impose penalties on the Utility. If supported by the evidence, the CPUC stated that it will consider ordering daily fines for a significant period of time. (See MD&A “Natural Gas Pipeline Matters” above.)

On June 8, 2011, the independent review panel appointed by the CPUC to investigate the San Bruno accident issued its report. The panel’s report concludes that “the explosion of the pipeline at San Bruno was a consequence of multiple weaknesses in PG&E’s management and oversight of the safety of its gas transmission system.” The panel recommends that the Utility implement various organizational changes and take other steps to improve customer safety and enhance reliability. On June 9, 2011, the CPUC ordered the Utility to submit an implementation plan to validate the MAOP of its gas transmission pipelines through hydrostatic pressure tests or to replace pipelines. The plan must be filed by August 26, 2011 along with a proposal to allocate the costs between customers and the Utility’s shareholders. The Utility may be required to bear a material amount of the implementation costs. Costs may also be affected by new federal or state pipeline regulations that may be adopted. The Utility also may incur third-party liability related to service disruptions caused by pressure reductions on its natural gas transmission pipelines.

Also, on June 9, 2011, the Utility was notified that representatives from the U.S. Department of Justice, the California Attorney General’s Office, and the San Mateo County District Attorney’s Office, are conducting an investigation of the San Bruno accident. (See MD&A “Natural Gas Pipeline Matters” above.)

During the quarter ended June 30, 2011, the Utility provided extensive information to the CPUC about its natural gas transmission system including the records related to the San Bruno accident, records related to weld defects, and safety risk assessments. On June 30, 2011, the Utility submitted the results of its review of class location designations for its pipelines. Under federal and state regulations, the class location designation is used to determine the pipeline’s MAOP. This review of class location designations has indicated that some pipelines had or may have an MAOP higher than appropriate for their current class location designations.

PG&E Corporation and the Utility are unable to predict the outcome of these matters, whether the CPUC will commence additional proceedings or investigations of the Utility’s natural gas operations, and whether such additional proceedings or investigations will result in further regulatory orders or the imposition of fines or penalties on the Utility.

***The CPUC may not approve the proposed resolution of its investigation of the Rancho Cordova accident and the Utility could incur penalties that are higher than the amount included in the proposed resolution.***

The CPUC is considering a proposed resolution of its investigation into the Rancho Cordova accident that provides that the Utility will pay a penalty of $26 million within twenty days after CPUC approval. (See MD&A “Natural Gas Pipeline Matters” above.) If the CPUC does not approve the resolution, the investigation will continue and the Utility could ultimately incur a higher penalty that could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows.

***If the Utility cannot timely meet the applicable resource adequacy or renewable energy requirements, the Utility may be subject to penalties. Further, the CPUC may disallow costs incurred by the Utility under power purchase agreements it enters into to meet applicable resource adequacy and renewable energy requirements if the CPUC finds that the costs are unreasonably above-market in the future.***

On April 12, 2011, the California Governor signed new legislation that increases the amount of renewable energy that retail sellers of electricity, such as the Utility, must deliver to their customers from at least 20% of their total retail sales by the end of 2010, as required by the prior law, to 33% of their total retail sales by the end of 2020. (See MD&A “Environmental Matters – Renewable Energy Resources” above.) In May 2011, the CPUC established a rulemaking proceeding to develop and adopt regulations to implement the new law. It is uncertain how the CPUC’s regulations and decisions issued pursuant to the former 20% renewable portfolio standard (“RPS”) statute will apply to the new RPS requirements, including whether the CPUC will continue to limit penalties for noncompliance to $25 million per year as had applied under the prior RPS regulatory program. PG&E Corporation and the Utility are unable to predict how or when the CPUC may fully implement the requirements in the new law.

The CPUC also has opened an investigation into the Utility’s compliance with resource adequacy requirements for March, April, and July 2010 and stated that it may impose a penalty on the Utility. (See MD&A “Regulatory Matters – Other Matters” above.)

***The operation and decommissioning of the Utility’s nuclear power plants expose it to potentially significant liabilities and capital expenditures that it may not be able to recover from its insurance or other sources, adversely affecting its financial condition, results of operations, and cash flow.***

As a result of the earthquake and tsunami that occurred in Japan that seriously damaged nuclear generation facilities, there has been increased legislative, regulatory, and public scrutiny of the safety of nuclear power plants in the United States. The NRC appointed a senior level agency task force to conduct a systematic review of NRC processes and regulations and evaluate whether enhancements or new regulations are needed. The NRC is reviewing the task force’s recommendations published on July 13, 2011. There has been increased public concern expressed about the safety of the Utility’s Diablo Canyon nuclear generation facilities located along the coastline in San Luis Obispo, California, which is in close proximity to active earthquake fault lines. On May 31, 2011, the NRC responded to the Utility’s request to defer taking final action on the Utility’s license renewal application by agreeing to delay issuance of the environmental impact report until after the Utility completes new seismic studies and submits the results to the NRC. The seismic studies are expected to be completed in 2014 or 2015. (See MD&A “Regulatory Matters – Diablo Canyon ” above.)

The Utility may be required to incur additional capital expenditures and other expenses to address any new seismic safety requirements, backup power requirements, or other requirements that the NRC may impose following its regulatory review or following the submission of the completed seismic studies for Diablo Canyon. The NRC may order the Utility to cease its nuclear operations until any safety concerns are addressed or the NRC may determine that the safety concerns cannot be addressed and order the Utility to cease operating Diablo Canyon. Alternatively, the Utility may determine that the safety concerns cannot be remedied in a feasible and economic manner and voluntarily cease operations at Diablo Canyon. The NRC has issued a letter finding that a Utility report analyzing seismological information did not conform to current licensing standards. The Utility will shortly submit a license amendment request to address this omission. PG&E Corporation and the Utility are uncertain how this issue will be resolved. The NRC could require the Utility to take additional action to address the non-conformance including ordering an assessment of whether it is safe to continue operating Diablo Canyon. Further, depending on the results of the license renewal process, the NRC could deny the license renewal applications requiring nuclear operations to cease when the current licenses expire.

In addition, the Utility may incur significant additional expenses to comply with more stringent laws or regulations that may be adopted by the NRC regarding the storage, handling, security, and disposal of radioactive materials, including spent nuclear fuel. If the Utility determines that it cannot comply with such new laws or regulations in a feasible and economic manner it may voluntarily cease operations at Diablo Canyon.

If the Utility is unable to recover costs it incurs to respond to safety concerns or if the Utility ceased its nuclear operations, PG&E Corporation’s and the Utility’s financial condition, results of operations and cash flows could be materially affected.

Filed Aug 4, 2011.