# Coeur Mining, Inc.: Form 10-Q for the period ended Sep 30, 2011

- Company: [Coeur Mining, Inc.](/companies/cde.md) (CIK 215466)
- Form: 10-Q
- Filed: 2011-11-07
- Accepted by EDGAR: Nov 7, 2011, 07:33 ET
- Period: 2011-09-30
- Accession: 0001193125-11-298648
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/215466/000119312511298648/d245931d10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/215466/000119312511298648/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2011-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2011-07-01 to 2011-09-30 | $343.6m | us-gaap:SalesRevenueGoodsNet |
| Revenue | 9 months, 2011-01-01 to 2011-09-30 | $774.3m | us-gaap:SalesRevenueGoodsNet |
| Cost of revenue | 3 months, 2011-07-01 to 2011-09-30 | $141.3m | us-gaap:CostOfGoodsSold |
| Cost of revenue | 9 months, 2011-01-01 to 2011-09-30 | $310.8m | us-gaap:CostOfGoodsSold |
| Gross profit | 3 months, 2011-07-01 to 2011-09-30 | $143.7m | us-gaap:GrossProfit |
| Gross profit | 9 months, 2011-01-01 to 2011-09-30 | $297.1m | us-gaap:GrossProfit |
| Operating income | 3 months, 2011-07-01 to 2011-09-30 | $127.4m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2011-01-01 to 2011-09-30 | $245.3m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2011-07-01 to 2011-09-30 | $8.0m | us-gaap:InterestExpense |
| Interest expense | 9 months, 2011-01-01 to 2011-09-30 | $26.6m | us-gaap:InterestExpense |
| Income tax | 3 months, 2011-07-01 to 2011-09-30 | $27.6m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2011-01-01 to 2011-09-30 | $61.9m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2011-07-01 to 2011-09-30 | $31.1m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2011-01-01 to 2011-09-30 | $82.1m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2011-07-01 to 2011-09-30 | $0.35 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2011-01-01 to 2011-09-30 | $0.92 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2011-07-01 to 2011-09-30 | $0.35 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2011-01-01 to 2011-09-30 | $0.92 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2011-07-01 to 2011-09-30 | 89,739,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2011-01-01 to 2011-09-30 | 89,702,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2011-07-01 to 2011-09-30 | $181.9m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Operating cash flow | 9 months, 2011-01-01 to 2011-09-30 | $328.8m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2011-07-01 to 2011-09-30 | $38.1m | us-gaap:PaymentsToAcquireProductiveAssets |
| Capital expenditure | 9 months, 2011-01-01 to 2011-09-30 | $79.8m | us-gaap:PaymentsToAcquireProductiveAssets |
| Cash and equivalents | at 2011-09-30 | $207.9m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2011-09-30 | $454.0m | us-gaap:AssetsCurrent |
| Total assets | at 2011-09-30 | $3.27bn | us-gaap:Assets |
| Current liabilities | at 2011-09-30 | $276.4m | us-gaap:LiabilitiesCurrent |
| Current portion of debt | at 2011-09-30 | $51.6m | us-gaap:DebtCurrent |
| Short-term borrowings | at 2011-09-30 | $0 | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2011-09-30 | $2.12bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 73,539 characters.

Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) is designed to provide the reader of our financial statements with a narrative from management’s perspective on our financial condition, results of operations, liquidity and other factors that may affect our future results. We believe it is important to read our MD&A in conjunction with our Annual Report on Form 10-K for the year ended December 31, 2010, as well as other publicly available information.

This report contains numerous forward-looking statements relating to the Company’s gold and silver mining business, including estimated production data, expected operating schedules, expected capital costs and other operating data and permit and other regulatory approvals. Such forward-looking statements are identified by the use of words such as “believes,” “intends,” “expects,” “hopes,” “may,” “should,” “will,” “plan,” “projected,” “contemplates,” “anticipates” or similar words. Actual production, operating schedules, results of operations, ore reserves and resources could differ materially from those projected in the forward-looking statements. The important factors that could cause actual results to differ materially from those in the forward-looking statements include: (i) the risk factors set forth below under Part II, Item 1A including the risk factors set forth under Item 1A (“Risk Factors”) of the Company’s Annual Report on Form 10-K for the year ended December 31, 2010 and the risk factors set forth under Item 1A (“Risk Factors”) of the Company’s Quarterly Report on Form 10-Q for the quarterly periods ended March 31, 2011 and June 30, 2011; (ii) risks and hazards inherent in the mining business (including environmental hazards, industrial accidents, weather and geologically related conditions); (iii) changes in the market prices of gold and silver; (iv) uncertainties inherent in the Company’s production, exploratory and developmental activities, including risks relating to permitting and regulatory delays; (v) any future labor disputes or work stoppages; (vi) uncertainties inherent in the estimation of gold and silver ore reserves; (vii) changes resulting from the Company’s future acquisition of new mining properties or businesses; (viii) reliance on third parties to operate certain mines where the Company owns silver production and reserves; (ix) the loss of any third-party smelter to which the Company markets silver and gold; (x) effects of environmental and other governmental regulations; (xi) risks inherent in the ownership or operation of or investment in mining properties or businesses in foreign countries; (xii) the worldwide economic downturn and difficult conditions in the global capital and credit markets; and (xiii) the Company’s possible inability to raise additional financing necessary to conduct its business, make payments or refinance its debt. Readers are cautioned not to put undue reliance on forward-looking statements. The Company disclaims any intent or obligation to update publicly these forward-looking statements, whether as a result of new information, future events or otherwise.

MD&A includes references to total cash operating costs and cash costs per ounce of silver and gold produced, both on an individual mine basis and on a consolidated basis. Total cash operating costs per ounce and cash costs per ounce are measurements that management uses to monitor and evaluate the performance of its mining operations and are not measurements calculated under U.S. GAAP. A reconciliation of total cash operating costs and cash costs per ounce to production expenses, which is calculated under U.S. GAAP, is provided in the section titled “Operating Statistics” herein and should be referred to when reading the total cash costs per ounce measurement.

#### Introduction to the Company

The Company is a large primary silver producer with growing gold production and has assets located in the United States, Mexico, Bolivia, Argentina and Australia. The Palmarejo mine, San Bartolomé mine, Kensington mine, Rochester mine and Martha mine, each of which is operated by the Company, and the Endeavor mine, which is operated by a non-affiliated party, constituted the Company’s principal sources of mining revenues during the first nine months of 2011. Coeur is an Idaho corporation incorporated in 1928.

The Company’s business strategy is to discover, acquire, develop and operate low-cost silver and gold operations that it expects to produce long-term cash flow, provide opportunities for growth through continued exploration, and generate superior and sustainable returns for shareholders. The Company’s management focuses on maximizing cash flow from its existing operations, the main elements of which are silver and gold prices, cash costs of production and capital expenditures. The Company also focuses on reducing its non-operating costs in order to maximize cash flow.

The results of the Company’s operations are significantly affected by the prices of silver and gold, which may fluctuate widely and are affected by numerous factors beyond the Company’s control, including interest rates, expectations regarding inflation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional political and economic conditions and other factors. In addition, the Company faces challenges including raising capital, increasing production and managing social, political and environmental issues. Operating costs at its mines are subject to variation due to a number of factors such as changing commodity prices, ore grades, metallurgy, revisions to mine plans and changes in accounting principles. At foreign locations, operating costs are also influenced by currency fluctuations that may affect the Company’s U.S. dollar costs.

### Overview of Performance

### Production

In the third quarter of 2011, the Company’s total silver production increased 13.3% to 4.9 million ounces as compared to 4.3 million ounces in the comparable period in 2010. The increase is primarily due to higher production from Palmarejo and San Bartolomé compared to the same time period in 2010. The Company’s total gold production in the third quarter of 2011 increased 9,538 ounces, or 20.1%, to 57,052 ounces, as compared to 47,514 ounces in the comparable period in 2010. The increase was primarily driven by the Kensington mine, which operated at full capacity during the third quarter of 2011.

### Sales of Metal

Sales of metal increased $225.0 million, or 189.8%, to $343.6 million in the third quarter of 2011, compared to $118.6 million in the third quarter of 2010, primarily due to production from the Kensington and Palmarejo mines and from substantially higher average realized silver and gold prices. The Company’s average realized silver and gold prices during the third quarter were $38.28 per ounce and $1,681 per ounce, respectively, representing increases of 102.9% and 36.9% respectively, over last year’s third quarter. Silver production contributed 68.0% of the Company’s total metal sales during the third quarter of 2011, compared to 61.8% during the third quarter of 2010.

### Earnings

The Company reported net income of $31.1 million, or $0.35 per share, and a net loss of $22.6 million, or $0.25 per share, for the three months ended September 30, 2011 and 2010, respectively. The Company reported net income of $82.1 million, or $0.92 per share, and a net loss of $86.2 million, or $1.00 per share, for the nine months ended September 30, 2011 and 2010, respectively. The earnings reflect non-cash fair value adjustments that decreased net income by $53.4 million and $19.1 million in the three months ended September 30, 2011 and 2010, respectively, and $71.1 million and $65.9 million in the nine months ended September 30, 2011 and 2010, respectively. These fair value adjustments are driven primarily by higher gold prices which increased the estimated future liabilities related to the Franco-Nevada royalty obligation, gold lease facility and put and call options.

Interest expense decreased $2.0 million during the three months ended September 30, 2011 as compared to the same period in 2010, primarily due to a decrease in total debt compared to the same time period last year.

### Other Highlights

In addition to the matters discussed above regarding the key elements of the Company’s business strategy, the matters management considers most important in evaluating the Company’s financial condition and results of operations include:

- Effective October 1, 2011, the Company’s Board of Directors had appointed Frank L. Hanagarne Jr., 53, to the office of Senior Vice President and Chief Financial Officer. Previous to his appointment as Senior Vice President and Chief Financial Officer, Mr. Hanagarne served from September 2006 to December 2010 as Director of Corporate Development at Newmont Mining Corporation, a gold producer, and from January 2011 to September 2011 as Chief Operating Officer of Valcambi SA, a precious metal refiner in which Newmont has an equity interest. Over a 17-year career at Newmont, Mr. Hanagarne also served as Mill Project Superintendent from September 2004 to September 2006 and as Advisor in Corporate Health and Safety and Loss Prevention from July 2001 to September 2004. His years of service at Newmont included positions of increasing responsibility within key areas of Newmont’s operations and business functions as well as environmental, health and safety. Mr. Hanagarne has a total 29 years of industry experience in the finance, operations, and business development areas. Mr. Hanagarne holds a Master’s degree in Business Administration from the University of Nevada, Reno, and a Bachelor of Metallurgical Engineering degree from the New Mexico Institute of Mining and Technology.
- The average price of silver (Handy & Harman) and gold (London Gold PM) for the three months ended September 30, 2011 was $38.96 and $1,702 per ounce, respectively, compared to $19.01 and $1,227 per ounce, respectively, for the three months ended September 30, 2010. The average price of silver (Handy & Harman) and gold (London Gold PM) for the nine months ended September 30, 2011 was $36.49 and $1,534 per ounce, respectively, compared to $18.12 and $1,178 per ounce, respectively, for the nine months ended September 30, 2010. The market price of silver and gold on November 4, 2011 was $34.16 per ounce and $1,749 per ounce, respectively.
- The Company produced a total of 4.9 million ounces of silver during the third quarter of 2011, which was a 13.3% increase over the third quarter of 2010. The Company produced a total of 57,052 ounces of gold during the third quarter of 2011, which was a 20.1% increase over the third quarter of 2010. The Company produced a total of 13.8 million ounces of silver during the nine months ended September 30, 2011 which was a 15.4% increase over the nine months ended September 30, 2010. The Company produced a total of 170,838 ounces of gold during the nine months ended September 30, 2011, which was a 77.2% increase over the nine months ended September 30, 2010.
- Net cash provided by operating activities for the third quarter of 2011 was $181.9 million, compared to $12.9 million during the third quarter of 2010. Net cash provided by operating activities for the first nine months of 2011 was $328.8 million, compared to $36.2 million during the first nine months of 2010.
- The Company spent $38.1 million on capital expenditures in the third quarter of 2011, which is slightly higher than the same time period last year. The Company spent $79.8 million on capital expenditures during the first nine months of 2011, compared to $129.4 million spent in the first nine months of 2010, which represents a 38.4% decrease. The majority of the capital expenditures during 2011 were at Rochester ($19.4 million), Palmarejo ($24.9 million), and Kensington ($22.0 million). Rochester expenditures related to the stage 3 leach pad. Palmarejo expenditures were for the final tailings dam. Kensington’s capital expenditures were for the paste backfill plant.
- During the third quarter of 2011, the Company purchased equity securities of publicly traded silver exploration and development companies for approximately $6.8 million.
- The Company’s ratio of current assets to current liabilities was 1.64 to 1 at September 30, 2011, which is a significant increase from .98 to 1.0 at December 31, 2010.
- There was a significant decrease in accrued liabilities and other as a result of the Company’s decision to sell metal on a spot basis as opposed to pre-selling, which it had done during the fourth quarter of last year and the repayment of the Mitsubishi gold lease position.

### Operating Highlights and Statistics

### Palmarejo Mine:

Production during the third quarter of 2011 was 2.3 million ounces of silver, which represented a 49.4% increase compared to the third quarter of 2010. Gold production was 29,815 ounces which was consistent with the third quarter of 2010. Production for the nine months ending September 30, 2011was 6.4 million ounces of silver and 90,963 ounces of gold, representing increases of 63.8% and 25.7%, respectively, compared to the same time period of 2010. The increase in production levels are due to a 37.7% increase in silver ore grades, combined with an increase in recovery rates on silver. Cash operating costs and total cash costs during the third quarter decreased to ($1.16) per ounce compared to $0.15 for the third quarter of 2010. Cash operating costs and total cash costs during the nine months ended September 30, 2011 decreased to ($0.47) per ounce compared to $4.85 for the same time period during 2010. Production costs applicable to sales for the three months ended September 30, 2011 increased by 104.6% compared to the same time period in 2010 due to an increase in production. Production costs applicable to sales increased 51.2% for the nine months ended September 30, 2011 compared to the same time period in 2010.

### San Bartolomé Mine:

Silver production for the third quarter of 2011 increased 14.3% to 2.1 million ounces of silver compared to 1.8 million ounces of silver in the third quarter of 2010. Silver production for the nine months ended September 30, 2011 increased 17.2% to 5.5 million ounces of silver, compared to 4.7 million ounces of silver during the same time period in 2010. Production costs applicable to sales increased by 133.2% during the third quarter of 2011 as compared to the third quarter of 2010. Production costs applicable to sales increased 54.9% during the nine months ended September 30, 2011 as compared to the same period in 2010. Total cash operating costs per ounce during the third quarter of 2011 were $9.32 and total cash costs per ounce, including royalties and taxes, were $10.89, compared to $7.05 and $7.83, respectively, in the third quarter of 2010. Total cash operating costs per ounce during the nine months ended September 30, 2011 were $9.07 and total cash costs per ounce, including royalties and taxes, were $10.58, compared to $7.99 and $8.69 for the same time period in 2010. Tons milled increased to 428,978 from 360,605 in the third quarter of 2010. Tons milled increased to 1,195,286 in the nine months ended September 30, 2011, from 1,100,619 for the same time period in 2010. Silver ore grades decreased 5.3% in the third quarter of 2011 as compared to the third quarter of 2010. Silver ore grades increased 6.5% in the nine months ended September 30, 2011 as compared to the nine months ended September 30, 2010.

On October 14, 2009, the Bolivian state-owned mining organization, COMIBOL, announced by resolution that it was temporarily suspending mining activities above the elevation of 4,400 meters above sea level while stability studies of Cerro Rico mountain are undertaken. The Company holds rights to mine above this elevation under valid contracts backed by Supreme Decree with COMIBOL as well as contracts with local mining cooperatives who hold their rights through COMIBOL. The Company temporarily adjusted its mine plan to confine mining activities to the ore deposits below 4,400 meters above sea level and timely notified COMIBOL of the need to lift the restriction. The mine plan has been temporarily adjusted and mining continues on the remainder of the property. In March 2010, San Bartolomé began mining operations above the 4,400 meter level in high grade material located in the Huacajchi deposit, which was confirmed to be excluded from the October 2009 resolution, under an agreement with the cooperatives. Access to the Huacajchi deposit and its higher grade material is having a beneficial effect on production and cost at the mine. Other mining areas above the 4,400 meter level continue to be suspended. The Company does not use explosives in its surface-only mining activities and is sensitive to the preservation of the mountain under its contracts with the state-owned mining entity and the local cooperatives.

### Kensington Mine:

The Kensington mine is an underground gold mine that commenced commercial production on July 3, 2010. Production for the third quarter of 2011 was 25,687 ounces of gold, as compared to 15,155 ounces of gold for the same time period of 2010. Production for the nine months ended September 30, 2011 was 75,121 ounces of gold, as compared to 15,155 ounces of gold for the same time period of 2010. Total cash operating costs per ounce in the third quarter of 2011 were $973.28 as compared to $1,199.20 for the same time period during 2010. Total cash operating costs per ounce in the nine months ended September 30, 2011 were $961.10, as compared to $1,199.20 for the same time period in 2010. In order to complete several initiatives designed to improve operational efficiency, Kensington will reduce its processing rates for the next six months to approximately 700 tons per day.

### Rochester Mine:

Production was 0.4 million ounces of silver and 1,435 ounces of gold during the third quarter of 2011 compared to 0.4 million ounces of silver and 1,935 ounces of gold in the third quarter of 2010. Production was 1.0 million ounces of silver and 4,283 ounces of gold during the nine months ended September 30, 2011 compared to 1.5 million ounces of silver and 7,241 ounces of gold during the same time period of 2010. Production was lower due to continued leach down of the ore on the existing leach pad. Production costs applicable to sales increased by 310.0% during the third quarter of 2011 and increased 69.9% during the nine months ended September 30, 2011, primarily due to the cost of ore being placed on the new leach pad in August and September, however production from the new leach pad is not expected to start until the fourth quarter of 2011. Total cash operating costs per ounce in the third quarter of 2011 were $36.71 and total cash costs per ounce, including production taxes, were $39.80 in the third quarter of 2011 as compared to total cash operating costs per ounce of $5.10 and total cash costs per ounce of $5.82 in the third quarter of 2010. Total cash operating costs per ounce in the first nine months of 2011 were $17.46 and total cash costs per ounce, including production taxes, were $19.87 in the first nine months of 2011 as compared to total cash operation costs per ounce of $2.93 and total cash costs per ounce of $3.55 for the same time period in 2010. The increase in total cash cost per ounce was primarily due to ore being placed on the new leach pad during August and September, while production from the new leach pad is not expected to begin until the fourth quarter.

In 2008, the Company commenced studies to investigate the potential to recommence mining and leaching of new material and in 2009 and 2010 completed feasibility studies demonstrating the viability of an expansion of mining and leaching operations at its Rochester mine through 2017. The Company prepared an Amended Plan of Operations for resumption of mining within the existing and permitted Rochester pit and construction of an additional heap leach pad, all within the currently permitted mine boundary. The Bureau of Land Management (BLM) deemed this plan complete in August 2009 under federal regulations and initiated the National Environmental Policy Act process. The BLM issued a positive Decision Record (DR) for the mine to extend silver and gold mining operations by several years with new production ounces expected to begin being recovered in the fourth quarter of 2011.

### Martha Mine:

Silver production at the Martha mine decreased 76.8% to 0.1 million ounces in the third quarter of 2011 compared to 0.5 million ounces in the third quarter of 2010. Silver production decreased 72.0% to 0.4 million ounces during the nine months ended September 30, 2011 as compared to 1.4 million ounces for the same time period in 2010. Production costs applicable to sales increased by 54.1% during the quarter due to a decrease in ore grade. Production costs applicable to sales decreased 31.3% during the nine months ended September 30, 2011 due to the significant decrease in production. Total cash operating costs per ounce in the third quarter of 2011 were $39.31 and total cash costs per ounce, including royalties and taxes, were $41.29, as compared to $9.86 and $11.04, respectively, during the third quarter of 2010. Total cash operating costs per ounce in the nine months ended September 30, 2011 were $32.48 and total cash costs per ounce, including royalties and taxes, were $33.95, as compared to $10.96 and $11.74, respectively, for the same time period during 2010. The decrease in silver production for the quarter was primarily due to an 87.4% decrease in ore grade as the mine transitions from primarily processing remnant ore and tailings to higher grade areas that are in development during the fourth quarter.

### Endeavor Mine:

Silver production at the Endeavor mine in the third quarter of 2011 was 0.1 million ounces compared to 0.1 million ounces in the third quarter of 2010. Silver production at the Endeavor mine in the nine months ended September 30, 2011 was 0.5 million ounces compared to 0.4 million ounces during the same time period in 2010. Production costs applicable to sales increased 368.6% during the quarter due to an increased operating cost contribution as a result of higher silver prices. Production costs applicable to sales increased 178.1% during the nine months ended September 30, 2011. Total cash costs per ounce of silver produced were $22.26 in the third quarter of 2011 compared to $10.32 in the third quarter of 2010. Total cash costs per ounce of silver produced were $19.79 during the nine months ended September 30, 2011, compared to $8.56 during the same time period in 2010. The increase in total cash cost per ounce was primarily due to the price participation component terms of the silver purchase agreement with CBH Resources Ltd. Under the terms of the price participation component, CDE Australia Pty. Ltd a subsidiary of the Company, pays an additional operating cost contribution of 50% of the amount by which the silver price exceeds $7.00 per ounce.

As of September 30, 2011, CDE Australia Pty Ltd had recovered approximately 77.5% of the transaction consideration consisting of 3.5 million payable ounces, or 17.4% of the 20.0 million maximum payable silver ounces to which CDE Australia Pty Ltd is entitled under the terms of the silver sale and purchase agreement.

### Operating Statistics from Continuing Operations

The following table presents information by mine and consolidated sales information for the three and nine month periods ended September 30, 2011 and 2010:

| Silver Operations: Palmarejo | Three months ended September 30, 2011 | 2010 | Nine months ended September 30, 2011 | 2010 |
| --- | ---: | ---: | ---: | ---: |
| Tons milled | 403,978 | 405,742 | 1,217,437 | 1,321,017 |
| Ore grade/Ag oz | 7.34 | 5.33 | 6.88 | 4.11 |
| Ore grade/Au oz | 0.08 | 0.08 | 0.08 | 0.06 |
| Recovery/Ag oz | 75.9% | 69.6% | 75.8% | 71.4% |
| Recovery/Au oz | 93.6% | 94.4% | 92.2% | 91.4% |
| Silver production ounces | 2,250,818 | 1,506,742 | 6,351,120 | 3,877,972 |
| Gold production ounces | 29,815 | 29,823 | 90,963 | 72,350 |
| Cash operating cost/oz | $(1.16) | $0.15 | $(0.47) | $4.85 |
| Cash cost/oz | $(1.16) | $0.15 | $(0.47) | $4.85 |
| Total production cost/oz | $17.33 | $15.08 | $18.07 | $21.24 |
| **San Bartolomé** |  |  |  |  |
| Tons milled | 428,978 | 360,605 | 1,195,286 | 1,100,619 |
| Ore grade/Ag oz | 5.40 | 5.70 | 5.21 | 4.89 |
| Recovery/Ag oz | 88.6% | 87.2% | 88.3% | 87.2% |
| Silver production ounces | 2,051,426 | 1,794,617 | 5,503,951 | 4,697,685 |
| Cash operating cost/oz | $9.32 | $7.05 | $9.07 | $7.99 |
| Cash cost/oz | $10.89 | $7.83 | $10.58 | $8.69 |
| Total production cost/oz | $13.90 | $10.58 | $13.61 | $11.70 |
| **Martha** |  |  |  |  |
| Tons milled | 24,086 | 12,790 | 64,025 | 42,786 |
| Ore grade/Ag oz | 5.33 | 42.42 | 7.24 | 37.36 |
| Ore grade/Au oz | 0.01 | 0.05 | 0.01 | 0.04 |
| Recovery/Ag oz | 92.3% | 96.3% | 86.2% | 89.9% |
| Recovery/Au oz | 72.9% | 93.6% | 74.0% | 88.0% |
| Silver production ounces | 118,523 | 510,685 | 399,630 | 1,425,796 |
| Gold production ounces | 115 | 601 | 471 | 1,675 |
| Cash operating cost/oz | $39.31 | $9.86 | $32.48 | $10.96 |
| Cash cost/oz | $41.29 | $11.04 | $33.95 | $11.74 |
| Total production cost/oz | $45.73 | $16.98 | $35.31 | $17.24 |
| Rochester (A) |  |  |  |  |
| Tons milled | 607,031 | — | 607,031 | — |
| Silver production ounces | 351,717 | 419,433 | 1,018,844 | 1,474,686 |
| Gold production ounces | 1,435 | 1,935 | 4,283 | 7,241 |
| Cash operating cost/oz | $36.71 | $5.10 | $17.46 | $2.93 |
| Cash cost/oz | $39.80 | $5.82 | $19.87 | $3.55 |
| Total production cost/oz | $41.72 | $7.01 | $21.75 | $4.62 |
| **Endeavor** |  |  |  |  |
| Tons milled | 182,226 | 188,198 | 556,901 | 464,379 |
| Ore grade/Ag oz | 1.43 | 1.45 | 1.97 | 2.14 |
| Recovery/Ag oz | 53.0% | 37.3% | 45.8% | 44.9% |
| Silver production ounces | 137,843 | 102,053 | 501,638 | 445,752 |
| Cash operating cost/oz | $22.26 | $10.32 | $19.79 | $8.56 |
| Cash cost/oz | $22.26 | $10.32 | $19.79 | $8.56 |
| Total production cost/oz | $28.88 | $13.55 | $24.57 | $11.79 |

39

| Gold Operation: Kensington(B) | Three months ended September 30, 2011 | 2010 | Nine months ended September 30, 2011 | 2010 |
| --- | ---: | ---: | ---: | ---: |
| Tons milled | 116,255 | 90,254 | 343,640 | 90,254 |
| Ore grade/Au oz | 0.24 | 0.19 | 0.24 | 0.19 |
| Recovery/Au oz | 91.7% | 87.7% | 92.3% | 87.7% |
| Gold production ounces | 25,687 | 15,155 | 75,121 | 15,155 |
| Cash operating cost/oz | $973.28 | $1,199.20 | $961.10 | $1,199.20 |
| Cash cost/oz | $973.28 | $1,199.20 | $961.10 | $1,199.20 |
| Total production cost/oz | $1,345.76 | $1,675.56 | $1,345.04 | $1,675.56 |
| **CONSOLIDATED PRODUCTION TOTALS (C)** |  |  |  |  |
| Total silver ounces | 4,910,326 | 4,333,530 | 13,755,183 | 11,921,891 |
| Total gold ounces | 57,052 | 47,514 | 170,838 | 96,421 |
| **Silver Operations:(D)** |  |  |  |  |
| Cash operating cost per oz - silver | $7.57 | $4.87 | $6.36 | $6.72 |
| Cash cost per oz - silver | $8.49 | $5.40 | $7.18 | $7.17 |
| Total production cost oz - silver | $18.65 | $12.62 | $17.30 | $14.59 |
| **Gold Operation:(E)** |  |  |  |  |
| Cash operating cost per oz - gold | $973.28 | $1,199.20 | $961.10 | $1,199.20 |
| Cash cost per oz - gold | $973.28 | $1,199.20 | $961.10 | $1,199.20 |
| Total production cost per oz - gold | $1,345.76 | $1,675.56 | $1,345.04 | $1,675.56 |
| CONSOLIDATED SALES TOTALS (F) |  |  |  |  |
| Silver ounces sold | 6,200,397 | 3,861,696 | 13,922,833 | 11,547,775 |
| Gold ounces sold | 67,391 | 37,507 | 183,243 | 86,890 |
| Realized price per silver ounce | $38.28 | $18.87 | $36.69 | $18.12 |
| Realized price per gold ounce | $1,681.42 | $1,228.51 | $1,522.65 | $1,177.31 |

(A) The Rochester mine has commenced to place ore on the new leach pad and production is expected in the fourth quarter of 2011. The leach cycle at Rochester requires five to ten years to recover gold and silver contained in the ore. The Company estimates the ultimate recovery to be approximately 61% for silver and 92% for gold. However, ultimate recoveries will not be known until leaching operations cease, which is currently estimated for 2014 for the current leach pad. Current recovery may vary significantly from ultimate recovery. See Critical Accounting Policies and Estimates – Ore on Leach Pad in the Company’s Form 10-K for the year ended December 31, 2010.

(B) Kensington achieved commercial production on July 3, 2010.

(C) Current production ounces and recoveries reflect final metal settlements of previously reported production ounces.

(D) Amount includes by-product gold credits deducted in computing cash costs per ounce.

(E) Amounts reflect Kensington per ounce statistics only.

(F) Units sold at realized metal prices will not match reported metal sales due primarily to the effects on revenues of mark-to-market adjustments on embedded derivatives in the Company’s provisionally priced sales contracts.

“Operating Costs per Ounce” and “Cash Costs per Ounce” are calculated by dividing the operating cash costs and cash costs computed for each of the Company’s mining properties for a specified period by the amount of gold ounces or silver ounces produced by that property during that same period. Management uses cash operating costs per ounce and cash costs per ounce as key indicators of the profitability of each of its mining properties. Gold and silver are sold and priced in the world financial markets on a U.S. dollar per ounce basis.

“Cash Operating Costs” and “Cash Costs” are costs directly related to the physical activities of producing silver and gold, and include mining, processing and other plant costs, third-party refining and smelting costs, marketing expenses, on-site general and administrative costs, royalties, in-mine drilling expenditures related to production and other direct costs. Sales of by-product metals are deducted from the above in computing cash costs. Cash costs exclude depreciation, depletion and amortization, accretion, corporate general and administrative expenses, exploration, interest, and pre-feasibility costs. Cash operating costs include all cash costs except production taxes and royalties, if applicable. Cash costs are calculated and presented using the “Gold Institute Production Cost Standard” applied consistently for all periods presented.

Total operating costs and cash costs per ounce are non-U.S. GAAP measures and investors are cautioned not to place undue reliance on them and are urged to read all U.S. GAAP accounting disclosures presented in the consolidated financial statements and accompanying footnotes. In addition, see the reconciliation of “cash costs” to production costs under “Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs” set forth below.

The following tables present a reconciliation between non-U.S. GAAP cash operating costs per ounce and cash costs per ounce to production costs applicable to sales including depreciation, depletion and amortization, which are calculated in accordance with U.S. GAAP:

### Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs

### Three months ended

### September 30, 2011

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Production of silver (ounces) | 2,250,818 | 2,051,426 | — | 351,717 | 118,523 | 137,843 | 4,910,327 |
| Production of gold (ounces) | — | — | 25,687 | — | — | — | 25,687 |
| Cash operating cost per Ag ounce | $(1.16) | $9.32 | $— | $36.71 | $39.31 | $22.26 | $7.57 |
| Cash costs per Ag ounce | $(1.16) | $10.89 | $— | $39.80 | $41.29 | $22.26 | $8.49 |
| Cash operating cost per Au ounce | $— | $— | $973.28 | $— | $— | $— | $973.28 |
| Cash cost per Au ounce | $— | $— | $973.28 | $— | $— | $— | $973.28 |
| Total Cash Operating Cost (Non-U.S. GAAP) | $(2,607) | $19,120 | $25,000 | $12,912 | $4,660 | $3,068 | $62,153 |
| Royalties | — | 3,217 | — | 827 | 234 | — | 4,278 |
| Production taxes | — | — | — | 260 | — | — | 260 |
| Total Cash Costs (Non-U.S. GAAP) | (2,607) | 22,337 | 25,000 | 13,999 | 4,893 | 3,068 | 66,691 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | — | — | (3,096) | — | (566) | (808) | (4,470) |
| By-product credit | 51,185 | — | — | 2,433 | 198 | — | 53,816 |
| Other adjustments | 435 | 111 | — | 117 | 290 | — | 953 |
| Change in inventory | 15,099 | 7,637 | 2,443 | (5,193) | 3,328 | 949 | 24,263 |
| Depreciation, depletion and amortization | 41,174 | 6,062 | 9,568 | 556 | 237 | 914 | 58,511 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $105,286 | $36,147 | $33,915 | $11,912 | $8,380 | $4,123 | $199,764 |

### Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs

### Nine months ended

### September 30, 2011

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Production of silver (ounces) | 6,351,120 | 5,503,951 | — | 1,018,844 | 399,630 | 501,638 | 13,775,183 |
| Production of gold (ounces) | — | — | 75,121 | — | — | — | 75,121 |
| Cash operating cost per Ag ounce | $(0.47) | $9.07 | $— | $17.46 | $32.48 | $19.79 | $6.36 |
| Cash costs per Ag ounce | $(0.47) | $10.58 | $— | $19.87 | $33.95 | $19.79 | $7.18 |
| Cash operating cost per Au ounce | $— | $— | $961.10 | $— | $— | $— | $961.10 |
| Cash cost per Au ounce | $— | $— | $961.10 | $— | $— | $— | $961.10 |
| Total Cash Operating Cost (Non-U.S. GAAP) | $(3,014) | $49,946 | $72,199 | $17,787 | $12,981 | $9,926 | $159,825 |
| Royalties | — | 8,281 | — | 1,734 | 587 | — | 10,602 |
| Production taxes | — | — | — | 728 | — | — | 728 |
| Total Cash Costs (Non-U.S. GAAP) | (3,014) | 58,227 | 72,199 | 20,249 | 13,568 | 9,926 | 171,155 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | — | — | (9,122) | — | (2,366) | (2,390) | (13,878) |
| By-product credit | 139,842 | — | — | 6,554 | 706 | — | 147,102 |
| Other adjustments | 1,208 | 298 | 19 | 256 | 462 | — | 2,243 |
| Change in inventory | 1,216 | (196) | 7,015 | (3,005) | (869) | 45 | 4,206 |
| Depreciation, depletion and amortization | 116,584 | 16,387 | 28,823 | 1,655 | 81 | 2,398 | 165,928 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $255,836 | $74,716 | $98,934 | $25,709 | $11,582 | $9,979 | $476,756 |

42

### Three months ended

### September 30, 2010

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Production of silver (ounces) | 1,506,742 | 1,794,617 | — | 419,433 | 510,685 | 102,053 | 4,333,530 |
| Production of gold (ounces) | — | — | 15,155 | — | — | — | 15,155 |
| Cash operating cost per Ag ounce | $0.15 | $7.05 | $— | $5.10 | $9.86 | $10.32 | $4.87 |
| Cash costs per Ag ounce | $0.15 | $7.83 | $— | $5.82 | $11.04 | $10.32 | $5.40 |
| Cash operating cost per Au ounce | $— | $— | $1,199.20 | $— | $— | $— | $1,199.20 |
| Cash costs per Au ounce | $— | $— | $1,199.20 | $— | $— | $— | $1,199.20 |
| Total Operating Cost (Non-U.S. GAAP) | $227 | $12,651 | $18,174 | $2,140 | $5,039 | $1,053 | $39,284 |
| Royalties | — | 1,396 | — | — | 601 | — | 1,997 |
| Production taxes | — | — | — | 304 | — | — | 304 |
| Total Cash Costs (Non-U.S. GAAP) | 227 | 14,047 | 18,174 | 2,444 | 5,640 | 1,053 | 41,585 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | — | — | (1,618) | — | (995) | (354) | (2,967) |
| By-product credit | 36,538 | — | — | 2,361 | 734 | — | 39,633 |
| Other adjustments | — | — | — | 53 | 914 | — | 967 |
| Change in inventory | (5,423) | (1,146) | (9,135) | (2,088) | (1,009) | (15) | (18,816) |
| Depreciation, depletion and amortization | 22,491 | 4,943 | 7,219 | 446 | 2,119 | 330 | 37,548 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $53,833 | $17,844 | $14,640 | $3,216 | $7,403 | $1,014 | $97,950 |

### Nine months ended

### September 30, 2010

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Production of silver (ounces) | 3,877,972 | 4,697,685 | — | 1,474,686 | 1,425,796 | 445,752 | 11,921,891 |
| Production of gold (ounces) | — | — | $15,155 | — | — | — | 15,155 |
| Cash operating cost per Ag ounce | $4.85 | $7.99 | $— | $2.93 | $10.96 | $8.56 | $6.72 |
| Cash costs per Ag ounce | $4.85 | $8.69 | $— | $3.55 | $11.74 | $8.56 | $7.17 |
| Cash operating cost per Au ounce | $— | $— | $1,199.20 | $— | $— | $— | $1,199.20 |
| Cash costs per Au ounce | $— | $— | $1,199.20 | $— | $— | $— | $1,199.20 |
| Total Operating Cost (Non-U.S. GAAP) | $18,799 | $37,520 | 18,174 | $4,315 | $15,624 | $3,817 | $98,249 |
| Royalties | — | 3,287 | — | — | 1,107 | — | 4,394 |
| Production taxes | — | — | — | 912 | — | — | 912 |
| Total Cash Costs (Non-U.S. GAAP) | 18,799 | 40,807 | 18,174 | 5,227 | 16,731 | 3,817 | 103,555 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | — | — | (1,618) | — | (2,821) | (964) | (5,403) |
| By-product credit | 85,429 | — | — | 8,480 | 1,971 | — | 95,880 |
| Other adjustments | — | — | — | 216 | 1,173 | — | 1,389 |
| Change in inventory | (12,120) | (3,162) | (9,135) | 230 | (312) | (127) | (24,626) |
| Depreciation, depletion and amortization | 63,574 | 14,152 | 7,219 | 1,368 | 6,673 | 1,440 | 94,426 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $155,682 | $51,797 | $14,640 | $15,521 | $23,415 | $4,166 | $265,221 |

43

### Exploration Activity

During the three months ending September 30, 2011, the Company completed over 39,600 meters (130,000 feet) of new core and reverse circulation drilling in its global exploration. The majority of this drilling was devoted to the Company’s Palmarejo property followed by Rochester, Joaquin and Kensington. During the quarter the company increased its exploration budget to over $23.5 million to allow it to accelerate drilling at all of its current properties. The Company expects to continue this increased level of exploration in the fourth quarter of 2011 and into 2012.

### Palmarejo (Mexico)

The Company completed over 21,500 meters (70,550 feet) in the third quarter in the Palmarejo District. This exploration drilling was split between targets around the current Palmarejo mine from both surface and underground drill platforms, specifically the Rosario, Tucson and Chapotillo zones, and at Guadalupe and La Patria deposits. This past quarter’s drilling at La Patria continued on exploration and definition of the northern zone. Highlights include the following assay data from La Patria:

Hole LPDH 147: 7.1 meters true width, 3.01 grams per tonne Au, 84 grams per tonne Ag

Hole LPDH 149: 6.8 meters true width, 26.21 grams per tonne Au, 291 grams per tonne Ag

Hole LPDH 152: 3.0 meters true width, 4.26 grams per tonne Au, 75 grams per tonne Ag

Hole LPDH 165: 15.2 meters true width, 3.81 grams per tonne Au, 89 grams per tonne Ag

Hole LPDH 170: 10.7 meters true width, 6.05 grams per tonne Au, 369 grams per tonne Ag

The Company is very encouraged by its initial drilling results from La Patria and has commenced a program of surface trenching to help define the continuity of the known vein structures in support of continued drilling.

### Rochester (USA)

Drilling at Rochester accelerated in the third quarter of the year. A total of 12,800 meters (42,000 feet) of reverse circulation drilling were completed at the Nevada Packard and Rochester silver and gold deposits. Nevada Packard is situated approximately 2.3 kilometers (1.4 miles) south of the current Rochester mine; drilling in the second quarter focused on expanding the deposit to the west. At Rochester, drilling was focused on the NWR zone at the north side of the mine. Highlights include the following assaying data from Nevada Packard and Rochester;

#### Nevada Packard

Hole NP11-017: 76.2 feet true width, 0.002 ounces per ton Au, 1.44 ounces per ton Ag

Hole NP11-064: 50.0 feet true width, 0.017 ounces per ton Au, 2.65 ounces per ton Ag

#### Northwest Rochester

Hole NWR11-003: 140.0 feet true width, 0.001 ounces per ton Au, 2.03 ounces per ton Ag

Hole NWR11-018: 69.2 feet true width, 0.003 ounces per ton Au, 2.31 ounces per ton Ag

Both deposits remain open for expansion. Drilling is expected to continue into the fourth quarter and into 2012.

### Martha and Joaquin (Argentina)

Over 3,600 meters (12,200 feet) of core drilling was completed on all targets in the Santa Cruz Province of southern Argentina in the third quarter of 2011. At Joaquin, drilling recommenced late in the quarter at the La Negra zone. The company plans to continue to drill to define the mineral resources at Joaquin and to work towards completion of a feasibility study, which would increase the Company’s managing and participating interest in the Joaquin project from 51% to 61%. Subject to certain conditions the company has an option to increase its interest further. The Joaquin project is located approximately 100 kilometers (62 miles) by road north of the Martha mine. Other targets drilled in the quarter were Betty and Wendy at Martha and Satélite, an early-stage prospect in eastern Santa Cruz.

### Kensington (USA)

Exploration at Kensington consisted of just over 1,000 meters (3,300 feet) of core drilling in the quarter, nearly all of which was devoted to the Raven vein zone which is located approximately 685 meters (2,250 feet) due west of the Kensington ore body. Raven is one of several gold-bearing vein structures, occurring within a 300- to 450-meter wide (1,000 to 1,500 feet) corridor, extending over 3,000 meters (9,800 feet) southward toward the Jualin deposit, near the mill facility. Late in the quarter initial drilling commenced on a new target termed Kensington South.

### San Bartolomé (Bolivia)

The new program of trenching and sampling, which commenced late in the first quarter, continued into the third quarter of 2011 at San Bartolomé. For the quarter ending September 30, 2011, 51 new backhoe trenches were completed and sampled, resulting in 339 new samples collected from one-meter vertical intervals. All of this work was centered on the Santa Rita and Diablo areas. For the nine months ended September 30, 2011, 1010 new samples have been collected from 164 trenches intended to expand and upgrade mineral resources.

### Critical Accounting Policies and Estimates

**Use of Estimates:** The preparation of the Company’s consolidated financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the amounts reported in their consolidated financial statements and accompanying notes. The areas requiring significant management estimates and assumptions relate to: recoverable ounces from proven and probable reserves that are the basis of future cash flow estimates and units-of-production depreciation and amortization calculations; useful lives utilized for depreciation, depletion and amortization; estimates of future cash flows for long-lived assets; estimates of recoverable gold and silver ounces in ore on leach pad; amount and timing of reclamation and remediation costs; valuation allowance for deferred tax assets; assessment of valuation allowance for value added tax receivables; and other employee benefit liabilities.

**Reclassifications:** Certain reclassifications of prior year balances have been made to conform to the current year presentation. The most significant reclassifications were to reclassify the Cerro Bayo statements of operations from historical presentation to income (loss) from discontinued operations in the consolidated statements of operations for all periods presented.

**Correction of an Immaterial Error:** In the fourth quarter of 2010, the Company identified an error in the amount of income tax benefit recognized in 2009. The Company assessed the materiality of this error in accordance with Staff Accounting Bulletin No. 108 and determined that the error was immaterial to previously reported amounts contained in its periodic reports and the Company intends to correct this error through subsequent periodic filings. See Note D – Correction of an Immaterial Error in the Company’s Form 10K for the year ended December 31, 2010.

Please see Note C – Summary of Significant Accounting Policies in the Company’s Form 10-K for the year ended December 31, 2010 for additional critical accounting policies and estimates.

### RESULTS OF OPERATIONS

### Three Months Ended September 30, 2011 Compared to Three Months Ended September 30, 2010

Sales of metal from continuing operations in the third quarter of 2011 increased by 189.8% to $343.6 million from $118.6 million in the third quarter of 2010. The increase in sales of metal was due to a 49.4% increase in the quantity of silver ounces produced at the Palmarejo silver and gold mine and a 14.3% increase in silver production at the San Bartolomé mine. In the third quarter of 2011, the Company sold 6.2 million ounces of silver and 67,391 ounces of gold compared to 3.9 million ounces of silver and 37,507 ounces of gold for the same period in 2010. Realized silver and gold prices in the third quarter of 2011 increased 102.9% and 36.9%, respectively, over the third quarter 2010. Realized silver and gold prices were $38.28 and $1,681.42 per ounce, respectively, in the third quarter of 2011, compared to $18.87 and $1,228.51 per ounce, respectively, in the comparable quarter of 2010.

Included in sales of metals are the by-product sales derived from the sale of gold by our silver mines. Total gold sales for the periods ending September 30, 2011 and 2010 were $109.9 million and $45.3 million, respectively. Of those totals, by-product metal sales were $65.7 million compared to $36.8 million, respectively. The Company believes that presentation of these metal sales as a by-product from its silver operations will continue to be appropriate in the future. The increases in by-product sales were primarily due to the increase in gold prices.

In the third quarter of 2011, the Company produced a total of 4.9 million ounces of silver and 57,052 ounces of gold, compared to 4.3 million ounces of silver and 47,514 ounces of gold in the third quarter of 2010. The increase is primarily due to higher production from Palmarejo and San Bartolomé compared with the same time period in 2010.

While quarterly sales of metal rose 189.8%, production costs applicable to sales of metal in the third quarter of 2011 increased only 133.9% from $60.4 million in the third quarter of 2010 to $141.3 million in the third quarter of 2011. This increase in sales is primarily due to the significant increases in metal prices. The increase in production costs is primarily due to the increase in production.

Depreciation and depletion increased by $20.9 million, from $37.8 million to $58.7 million, compared to the third quarter of 2010. The increase is due to depreciation and depletion expense from the Kensington mine, which commenced commercial production in the third quarter of 2010.

#### Costs and Expenses

Administrative and general expenses increased by $2.2 million, from $6.0 million to $8.2 million, as compared to the third quarter of 2010. The increase is primarily related to severance related expenses connected to the resignation of the Company’s former CEO.

Exploration expenses increased to $4.8 million in the third quarter of 2011 compared to $3.8 million in the same period of 2010 primarily due to increased exploration activity at the Palmarejo location.

#### Other Income and Expenses

The Company recognized $0.8 million of losses on debt extinguishments during the third quarter of 2011 related to payments on the Senior Term Notes due 2012 compared to a loss of $0.8 million during the third quarter of 2010 also relating to payments on the Senior Term Notes due 2012.

Non-cash fair value adjustments, net in the three months ended September 30, 2011 were a loss of $53.4 million compared to a loss of $19.1 million in the third quarter of 2010. The majority of the increase in the loss was due to Franco-Nevada derivative adjustments during the quarter.

The loss from interest income and other in the third quarter of 2011 increased by $6.0 million to a loss of $6.6 million compared with a loss of $0.6 million in the third quarter of 2010. The increase in the loss was primarily due to foreign currency transactions in Mexico.

Interest expense, net of capitalized interest, decreased to $8.0 million in the third quarter of 2011 from $10.0 million in the third quarter of 2010. The decrease in interest expense was primarily due to a decrease in total debt and capital leases outstanding during the quarter.

#### Income Taxes

For the three months ended September 30, 2011, the Company reported an income tax provision of approximately $27.6 million compared to an income tax provision of $3.2 million in the third quarter of 2010. The following table summarizes the components of the Company’s income tax provision for the three months ended September 30, 2011 and 2010 (in thousands):

| Current: | Three months ended September 30, 2011 | 2010 |
| --- | ---: | ---: |
| United States - Alternative minimum tax | $93 | $(3) |
| United States - Foreign withholding | (157) | (490) |
| Argentina | (23) | (3,505) |
| Australia | (1,164) | (82) |
| Mexico | (504) | (40) |
| Bolivia | (22,741) | (6,973) |
| Deferred: |  |  |
| United States | 1,364 | 1,918 |
| Australia | 306 | 228 |
| Mexico | (2,459) | 5,201 |
| Bolivia | (2,321) | 513 |
| Income tax benefit (provision) | $(27,606) | $(3,233) |

During the three months ended September 30, 2011, the Company recognized a current provision in Bolivia, Mexico, and Australia primarily related to higher metal prices and inflation adjustments on non-monetary assets. Further, the Company accrued foreign withholding taxes of approximately $0.2 million on inter-company transactions between the U.S. parent and subsidiaries operating in Argentina and Australia. In addition, the Company recognized a net $3.1 million deferred tax provision for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in Bolivia and Mexico).

During the three months ended September 30, 2010, the Company recognized a current provision in Bolivia and Argentina primarily related to higher metal prices and inflationary adjustments on non-monetary assets. Further, the Company accrued foreign withholding taxes of approximately $0.5 million on inter-company transactions between the U.S. parent and subsidiaries operating in Mexico, Argentina and Australia. Finally, the Company recognized a net $7.9 million deferred tax benefit for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in Mexico).

#### Results of Discontinued Operations

In August 2010, the Company closed the sale of its interest in the Cerro Bayo mine. Cerro Bayo has been reported in discontinued operations for the three month period ended September 30, 2010. The gain from discontinued operations (net of taxes) for the three month period ended September 30, 2010 was $0.6 million.

The following is a summary of the Company’s discontinued operations included in the consolidated statements of operations for the three months ended September 30, 2010 (in thousands):

|  | Three months ended September 30, 2010 |
| --- | ---: |
| Sales of metals | $— |
| Depreciation and depletion | (112) |
| Care and maintenance expense | (472) |
| Other operating expenses | (3) |
| Interest and other income | 336 |
| Income tax (expense) | — |
| Loss on sale of discontinued assets | 882 |
| Income (loss) from discontinued operations | $631 |

### Nine Months Ended September 30, 2011 Compared to Nine Months Ended September 30, 2010

Sales of metal from continuing operations in the nine months ended September 30, 2011 increased by 151.5% to $774.3 million from $307.9 million in the same time period in 2010. The increase in sales of metal was due to an increase in the quantity of gold and silver ounces sold, combined with an increase in metal prices. In the nine months ended September 30, 2011, the Company sold 14.0 million ounces of silver and 183,243 ounces of gold compared to 11.5 million ounces of silver and 86,890 ounces of gold for the same period in 2010. Realized silver and gold prices in the nine months ended September 30, 2011 increased 102.5% and 29.3%, respectively, over the same time period in 2010. Realized silver and gold prices were $36.69 and $1,522.65 per ounce, respectively, in nine months ended September 30, 2011, compared to $18.12 and $1,177.31 per ounce, respectively, in the comparable time period of 2010.

Included in sales of metals are the by-product sales derived from the sale of gold by our silver mines. Total gold sales for the nine months ending September 30, 2011 and 2010 were $269.3 million and $101.3 million, respectively. Of those totals, by-product metal sales were $151.0 million compared to $92.8 million, respectively. The Company believes that presentation of these metal sales as a by-product from its silver operations will continue to be appropriate in the future.

In the nine months ended September 30, 2011, the Company produced a total of 13.8 million ounces of silver and 170,838 ounces of gold, compared to 11.9 million ounces of silver and 96,421 ounces of gold in the nine months ended September 30, 2010. The increase is primarily due to higher production from Palmarejo and San Bartolomé relative to the same time period in 2010. The Company’s total gold production in the nine months ended September 30, 2011 increased 74,417 ounces or 77.2% as compared to the same period in 2010. The increase was primarily driven by the Kensington mine, which operated at full capacity beginning in the second quarter of 2011.

In the nine months ended September 30, 2011, sales of metal rose 151.5%, while production costs applicable to sales of metal in the same time period increased only 82.0% from $170.8 million to $310.8 million. This increase in sales is primarily due to significant increases in metal prices.

Depreciation and depletion increased by $70.8 million, from $95.5 million to $166.3 million, compared to the same time period in 2010. The increase is due to depreciation and depletion expense from the Kensington mine, which commenced commercial production in the third quarter of 2010.

#### Costs and Expenses

Administrative and general expenses increased to $22.3 million in the nine months ended September 30, 2011 from $19.8 million in the nine months ended September 30, 2010, primarily due to severance related expenses connected to the departure of the Company’s former CEO.

Exploration expenses increased to $11.6 million in the nine months ended September 30, 2011 compared to $9.5 million in the same period of 2010 due to increased exploration activity.

#### Other Income and Expenses

The Company recognized $1.6 million of losses on debt extinguishments during the nine months ended September 30, 2011 related to payments on the Senior Term Notes due 2012 compared to a loss of $12.7 million during the nine months ended September 30, 2010, due to the exchange of a portion of the 3.25% Convertible Senior Notes due 2028 and the 1.25% Convertible Senior Notes due 2024 for shares of common stock.

Non-cash fair value adjustments, net in the nine months ended September 30, 2011 was a loss of $71.1 million compared to a loss of $65.9 million in the same time period of 2010. The majority of the adjustments were related to the Franco Nevada derivatives and Alaska options.

The loss from interest and other income in the nine months ended September 30, 2011 decreased by $0.8 million to a loss of $1.9 million compared to a loss of $2.7 million in the same time period of 2010.

Interest expense, net of capitalized interest, increased to $26.6 million in the nine months ended September 30, 2011 from $21.4 million in the same time period of 2010. The increase in interest expense was primarily due to a decrease in capitalized interest related to the Kensington mine, which was placed into service on July 3, 2010.

#### Income Taxes

For the nine months ended September 30, 2011, the Company reported an income tax provision of approximately $61.9 million compared to an income tax benefit of $13.1 million in the same time period of 2010. The following table summarizes the components of the Company’s income tax benefit (provision) for the nine months ended September 30, 2011 and 2010 (in thousands):

| Current: | Nine months ended September 30, 2011 | 2010 |
| --- | ---: | ---: |
| United States - Alternative minimum tax | $2,031 | $(3) |
| United States - Foreign withholding | (648) | (1,605) |
| Argentina | 60 | (5,646) |
| Australia | (1,823) | (139) |
| Mexico | (644) | (123) |
| Bolivia | (47,746) | (9,863) |
| Deferred: |  |  |
| United States | (1,041) | 16,404 |
| Australia | (153) | (354) |
| Mexico | (12,521) | 15,564 |
| Bolivia | 538 | (1,098) |
| Income tax benefit (provision) | $(61,947) | $13,137 |

During the nine months ended September 30, 2011, the Company recognized a current provision in Bolivia, Mexico, and Australia primarily related to higher metal prices and inflation adjustments on non-monetary assets. Further, the Company accrued foreign withholding taxes of approximately $0.6 million on inter-company transactions between the U.S. parent and subsidiaries operating in Argentina and Australia, and a $2.0 million benefit for anticipated operating losses in the U.S. In addition, the

Company recognized a net $13.2 million deferred tax provision for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in the U.S. and Mexico).

During the nine months ended September 30, 2010, the Company recognized a current provision in Bolivia and Argentina primarily related to higher metal prices and inflationary adjustments on non-monetary assets. Further, the Company accrued foreign withholding taxes of approximately $1.6 million on inter-company transactions between the U.S. parent and subsidiaries operating in Mexico, Argentina and Australia. Finally, the Company recognized a net $30.5 million deferred tax benefit for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in the U.S. and Mexico).

#### Results of Discontinued Operations

In August 2010, the Company closed the sale of its interest in the Cerro Bayo mine. Cerro Bayo has been reported in discontinued operations for the nine month period ended September 30, 2010. There was no gain (loss) from discontinued operations for the nine month period ended September 30, 2011. The loss from discontinued operations (net of taxes) for the nine month period ended September 30, 2010 was $8.1 million.

The following is a summary of the Company’s discontinued operations included in the consolidated statements of operations for the nine months ended September 30, 2010 (in thousands):

|  | Nine months ended September 30, 2010 |
| --- | ---: |
| Sales of metals | $— |
| Depreciation and depletion | (2,194) |
| Care and maintenance expense | (2,350) |
| Other operating expenses | (19) |
| Interest and other income | (145) |
| Income tax (expense) | (1,321) |
| Loss on sale of discontinued assets | (2,095) |
| Income (loss) from discontinued operations | $(8,124) |

#### LIQUIDITY AND CAPITAL RESOURCES

### Liquidity

#### Working Capital; Cash and Cash Equivalents

As of September 30, 2011, the Company’s cash, equivalents and short-term investments totaled $209.0 million compared to $66.1 million as of December 31, 2010. The increase was primarily attributed to increases in cash provided by operating activities, offset by cash used for investing and financing activities. See “Cash Provided by Operating Activities.”

The Company’s working capital increased by $182.2 million between December 31, 2010 and September 30, 2011 to $177.7 million, compared to a deficit of $4.5 million at December 31, 2010. The ratio of current assets to current liabilities was 1.64 to 1 at September 30, 2011 and was 0.98 to 1 at December 31, 2010. The increase was primarily attributable to an increase in cash provided by operating activities.

The Company intends to indefinitely reinvest a portion of its earnings from its Palmarejo operations in Mexico. Accordingly, U.S. and non-U.S. income and withholding taxes for which deferred taxes might otherwise be required, have not been provided on a cumulative amount of temporary differences (including, for this purpose, any difference between the tax basis in the stock of a consolidated subsidiary and the amount of the subsidiary’s net equity determined for financial reporting purposes) related to investments in foreign subsidiaries of approximately $170 million for the nine months ended September 30, 2011 and the year ended December 31, 2010. The additional U.S. and non-U.S. income and withholding tax that would arise on the reversal of the temporary differences could be offset in part, by tax credits. Because the determination of the amount of available tax credits and the limitations imposed on the annual utilization of such credits are subject to a highly complex series of calculations and expense allocations, it is impractical to estimate the amount of net income and withholding tax that might be payable if a reversal of temporary differences occurred. The Company does not believe that the amounts permanently reinvested will have a material impact on liquidity.

### Cash Provided by Operating Activities

Net cash provided by operating activities in the three months ended September 30, 2011 was $181.9 million, compared with $12.9 million for the same time period in 2010. Net cash provided by operating activities in the nine months ended September 30, 2011 was $328.8 million, compared with $36.2 million for the same time period in 2010. The significant increase is primarily the result of increased sales driven by higher metal prices. Excluding changes in operating assets and liabilities, the Company’s operating cash flow consisted of the following:

*(In thousands)*

|  | Nine months ended September 30, 2011 | 2010 |
| --- | ---: | ---: |
| CASH (USED IN) PROVIDED BY OPERATING ACTIVITIES | $328,761 | $36,166 |
| Changes in operating assets and liabilities: |  |  |
| Receivables and other current assets | 30,854 | 12,136 |
| Inventories | 12,834 | 27,888 |
| Accounts payable and accrued liabilities | (15,538) | 8,298 |
| Operating cash flow | $356,911 | $84,488 |

### Cash Used in Investing Activities

Net cash used in investing activities in the nine months ended September 30, 2011 was $96.2 million, compared to $111.0 million used in investing activities in the nine months ended September 30, 2010. The decrease is primarily due to lower capital investment activity at the Kensington mine.

The Company spent $38.1 million on capital expenditures in the third quarter of 2011, compared with $36.8 million during the same time period last year. During the nine months ended September 30, 2011, capital expenditures totaled $79.8 million compared to $129.4 million for the first nine months of 2010. The majority of the capital expenditures for the first nine months of 2011 were at Palmarejo, Rochester, and Kensington. The majority of the capital expenditures for the first nine months of 2010 were at Kensington, which began commercial production in July 2010.

During the three months ended September 30, 2011, the Company used cash of $45.0 million for capital expenditures and to purchase investments, including approximately $6.8 million to purchase equity securities in development stage mining companies, and generated cash of $0.5 million by selling investments.

### Cash Used in Financing Activities

Net cash used in financing activities during the three months ended September 30, 2011 was $35.8 million compared to $7.9 million for the same time period last year. During the three months ended September 30, 2011, the Company paid $35.9 million to reduce existing debt. During the three months ended September 30, 2010, the Company borrowed $22.7 million and paid $30.8 million to reduce existing debt.

The Company’s financing activities used $90.8 million of cash during the nine months ended September 30, 2011 compared to cash provided by financing activity of $79.8 million during the nine months ended September 30, 2010. The company made significant debt repayments during the first nine months of 2011.

#### Debt and Capital Resources

### 3.25% Convertible Senior Notes due 2028

As of September 30, 2011, the outstanding balance of the 3.25% Convertible Senior Notes was $48.7 million, or $44.9 million net of debt discount.

The carrying value of the equity component representing the embedded conversion option at September 30, 2011 and December 31, 2010 was $10.9 million and $10.9 million, respectively.

Each holder of the notes may require that the Company repurchase some or all of the holder’s notes on March 15, 2013, March 15, 2015, March 15, 2018 and March 15, 2023 at a repurchase price equal to 100% of the principal amount of the notes to be repurchased, plus accrued and unpaid interest, in cash, shares of common stock or a combination of cash and shares of common stock, at the Company’s election. Holders will also have the right, following certain fundamental change transactions, to require the Company to repurchase all or any part of their notes for cash at a repurchase price equal to 100% of the principal amount of the notes to be repurchased plus accrued and unpaid interest. The Company may redeem the notes for cash in whole or in part at any time on or after March 22, 2015 at 100% of the principal amount of the notes to be redeemed plus accrued and unpaid interest.

The notes provide for “net share settlement” of any conversions. Pursuant to this feature, upon conversion of the notes, the Company (1) will pay the note holder an amount in cash equal to the lesser of the conversion obligation or the principal amount of the notes and (2) will settle any excess of the conversion obligation above the notes’ principal amount in the Company’s common stock, cash or a combination thereof, at the Company’s election.

The notes are convertible under certain circumstances, as defined in the indenture agreement, at the holder’s option, at an initial conversion rate of 17.60254 shares of the Company’s common stock per $1,000 principal amount of notes, which is equivalent to an initial conversion price of approximately $56.81 per share, subject to adjustment in certain circumstances.

### 1.25% Convertible Senior Notes due 2024

As of September 30, 2011, the Company had no outstanding 1.25% Convertible Senior Notes.

On January 18, 2011, the Company repurchased $945,000 in aggregate principal amount of the notes pursuant to a Tender Offer Statement filed on December 10, 2010. The Company repurchased the remaining $914,000 in aggregate principal amount of the notes outstanding on January 21, 2011.

### Senior Term Notes due December 31, 2012

As of September 30, 2011 the balance of the Senior Term Notes was $18.8 million.

For the three and nine months ended September 30, 2011 the Company paid in cash, $3.8 million and $11.3 million in principal and $0.4 million and $1.3 million in interest, respectively, in connection with the quarterly payments due under the notes. In addition, $0.8 million and $1.6 million were paid and recognized as a loss in connection with quarterly debt payments as a result of the Company’s election to make the required principal and interest payment entirely in cash.

The Company elected to pay the June 30, 2010 payment on the notes with a combination of 50% cash and 50% common stock. The March 31, 2010 payment was paid entirely with common stock. For the three and nine months ended September 30, 2010 the Company issued nil shares and 1,060,413 shares, respectively, of the Company’s stock. In addition, $0.8 million and $2.4 million were paid and recognized as a loss in connection with quarterly debt payments. The loss is recorded in debt extinguishments.

### Kensington Term Facility

As of September 30, 2011 the balance of the Kensington term facility was $82.8 million.

As a condition to the Kensington term facility with Credit Suisse, the Company agreed to enter into a gold hedging program which protects a minimum of 243,750 ounces of gold production over the life of the facility against the risk associated with fluctuations in the market price of gold. This program consists of a series of zero cost collars which consist of a floor price and a ceiling price of gold. Collars protecting 182,500 ounces of gold call options were outstanding at September 30, 2011. The weighted average call feature of each collar was $1,889.05. Collars protecting 205,000 ounces of gold put options were outstanding at September 30, 2011. The weighted average put feature of each collar was $947.19.

### Gold Lease Facility

As of September 30, 2011, the Company had no gold leased from Mitsubishi International Corporation (“MIC”). At December 31, 2010, the Company had 10,000 ounces of gold leased from MIC, which it delivered to MIC on March 22, 2011. The Company accounted for the gold lease facility as a derivative instrument, which is recorded in accrued liabilities and other in the balance sheet.

As of December 31, 2010, based on the current futures metals prices for each of the delivery dates and using a 3.1% discount rate, the fair value of the instrument was a liability of $14.1 million. The pre-credit risk adjusted fair value of the net derivative liability as of December 31, 2010 was $14.2 million. A credit risk adjustment of $0.1 million to the fair value of the derivative reduced the reported amount of the net derivative liability on the Company’s consolidated balance sheet to $14.1 million.

### Capital Leases

As of September 30, 2011, Coeur Mexicana SA de CV (“Coeur Mexicana”), a wholly owned subsidiary of the Company, had outstanding balances on capital leases of $21.0 million.

Other capital leases for equipment and facilities leases totaling $8.5 million were outstanding at September 30, 2011 with monthly payments through May 31, 2016.

### Other

On July 6, 2010, the Company entered into a short-term financing agreement with AFCO Credit Corporation of $2.4 million bearing interest at 2.9% to finance insurance premiums. Installments of $0.2 million are paid monthly with the final payment to be made on June 1, 2011. As of September 30, 2011, and December 31, 2010, the outstanding balance was nil, and $1.1 million, respectively.

On July 15, 2009, to fund equipment purchases, Coeur Mexicana entered into an equipment financing agreement bearing interest at 8.26% with Atlas Copco. This agreement is secured by certain machinery and equipment. The loans call for twenty-four monthly installments with the final payment due on January 31, 2012. As of September 30, 2011, and December 31, 2010, the outstanding balance was $0.2 million and $1.2 million, respectively.

On November 27, 2009, Empresa Minera Manquiri borrowed $5.0 million pursuant to a bank loan from Banco Bisa bearing an interest rate of 6.5% to fund working capital requirements. As of September 30, 2011 and December 31, 2010, the outstanding balance was nil and $2.5 million, respectively.

### Palmarejo Gold Production Royalty Obligation

The Company recognized accretion expense on the Palmarejo gold production royalty obligation of $5.4 million and $5.4 million for the three months ended September 30, 2011 and 2010, respectively, and $16.4 million and $15.4 million for the nine months ended September 30, 2011 and 2010, respectively. As of September 30, 2011 and December 31, 2010, the remaining minimum obligation under the royalty agreement was $74.2 million and $80.3 million, respectively.

### Capitalized Interest

The Company capitalizes interest incurred on its various debt instruments as a cost of properties under development. For the three months ended September 30, 2011, and 2010 the Company capitalized interest of $0.9 million and $0.7 million, respectively, and for the nine months ended September 30, 2011 and 2010, $1.3 million and $9.1 million, respectively.

### Litigation and Other Events

For a discussion of litigation and other events, see Note 19 to the Company’s Consolidated Financial Statements, Litigation and Other Events.

## Market risk

As filed, 11,291 characters.

### Risk Mitigation Overview

The Company is exposed to various market risks as a part of its operations. In an effort to mitigate losses associated with these risks, the Company may, at times, enter into derivative financial instruments. These may take the form of forward sales contracts, foreign currency exchange contracts and interest rate swaps. The Company does not actively engage in the practice of trading derivative instruments for profit. This discussion of the Company’s market risk assessments contains “forward looking statements” that are subject to risks and uncertainties. Actual results and actions could differ materially from those discussed below.

The Company’s operating results are substantially dependent upon the world market prices of silver and gold. The Company has no control over silver and gold prices, which can fluctuate widely and are affected by numerous factors, such as supply and demand and investor sentiment. From time to time, in order to mitigate some of the risk associated with these fluctuations, the Company may enter into forward sale contracts. The Company continually evaluates the potential benefits of engaging in these strategies based on current market conditions. The Company may be exposed to nonperformance risk by counterparties as a result of its hedging activities. This exposure would be limited to the amount that the spot price of the metal falls short of the contract price. The Company enters into contracts and other arrangements from time to time in an effort to reduce the negative effect of price changes on its cashflows. These arrangements typically consist of managing the Company’s exposure to foreign currency exchange rates and market prices associated with changes in gold and silver commodity prices. The Company also may manage price risk by purchasing put options.

### Concentrate Sales Contracts

The Company enters into concentrate sales contracts with third-party smelters. The contracts, in general, provide for a provisional payment based upon provisional assays and quoted metal prices. The provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative, which is the final settlement price based on a future price, does not qualify for hedge accounting. These embedded derivatives are recorded as derivative assets (in Prepaid expenses and other) or derivative liabilities (in Accrued liabilities and other) on the balance sheet and are adjusted to fair value through earnings each period until the date of final settlement. At September 30, 2011, the Company had outstanding provisionally priced sales of $30.1 million, consisting 414,767 ounces of silver and 7,679 ounces of gold, which had a fair value of $27.4 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $4,000; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $7,700. At December 31, 2010, the Company had outstanding provisionally priced sales of $35.7 million consisting of 647,711 ounces of silver and 12,758 ounces of gold, which had a fair value of approximately $37.4 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $6,000 and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $12,800.

### Foreign Currency Contracts

The Company operates, or has mining interests, in several foreign countries, specifically Argentina, Australia, Bolivia, and Mexico, which exposes the Company to risks associated with fluctuations in the exchange rates of the currencies involved. From time to time, as part of its program to manage foreign currency risk, the Company may enter into foreign currency forward exchange contracts. These contracts enable the Company to purchase a fixed amount of foreign currencies at pre-established exchange rates. Gains and losses on foreign exchange contracts that are related to firm commitments are designated and effective as hedges and are deferred and recognized in the same period as the related transaction. All other contracts that do not qualify as hedges are marked to market and the resulting gains or losses are recorded in income. The Company continually evaluates the potential benefits of entering into these contracts to mitigate foreign currency risk and proceeds when it believes that the exchange rates are most beneficial.

The Company periodically enters into forward foreign currency contracts to reduce the foreign exchange risk associated with forecasted Mexican peso (“MXP”) operating costs at its Palmarejo mine. At September 30, 2011, the Company had MXP foreign exchange contracts of $24.6 million in U.S. dollars. These contracts require the Company to exchange U.S. dollars for MXP at a weighted average exchange rate of 11.95 MXP to each U.S. dollar and had a fair value of ($3.8) million at September 30, 2011. The Company recorded mark-to-market losses of $4.1 million and $3.8 million for the three and nine months ended September 30, 2011, respectively, and $0.3 million and $(0.9) million for the three and nine months ended September 30, 2010, respectively, which is reflected in fair value adjustments, net. The Company recorded realized gains (losses) of ($0.1) million and $1.0 million in Production costs applicable to sales during the three and nine months ended September 30, 2011, respectively, and $0.4 million and $0.9 million during the three and nine months ended September 30, 2010, respectively.

### Gold Lease Facility

As of September 30, 2011, the Company had no gold leased from Mitsubishi International Corporation (“MIC”). At December 31, 2010, the Company had 10,000 ounces of gold leased from MIC, which it delivered to MIC on March 22, 2011. The Company accounts for the gold lease facility as a derivative instrument, which is recorded in accrued liabilities and other in the balance sheet.

On December 12, 2008, the Company entered into a gold lease facility with MIC. Pursuant to this facility, the Company may lease amounts of gold from MIC and is obligated to deliver the same amounts back to MIC and to pay specified lease fees to MIC that are equivalent to interest at current market rates on the value of the gold leased. Pursuant to a Second Amended and Restated Collateral Agreement, the Company’s obligations under the facility are secured by certain collateral. The collateral agreement specifies the maximum amount of gold the Company may lease from MIC, as well as the amount and type of collateral.

As of December 31, 2010, based on the current futures metals prices for each of the delivery dates and using a 3.1% discount rate, the fair value of the instrument was a liability of $14.1 million. The pre-credit risk adjusted fair value of the net derivative liability as of December 31, 2010 was $14.2 million. A credit risk adjustment of $0.1 million to the fair value of the derivative reduced the reported amount of the net derivative liability on the Company’s consolidated balance sheet to $14.1 million.

### Palmarejo Gold Production Royalty

On January 21, 2009, the Company entered into the gold production royalty transaction with Franco-Nevada Corporation described in Note 10 to the Company’s Consolidated Financial Statements, Debt and Capital Lease Obligations, Palmarejo Gold Production Royalty Obligation. The minimum royalty obligation ends when payments have been made on a total of 400,000 ounces of gold. As of September 30, 2011, a total of 272,973 ounces of gold remain outstanding under the minimum royalty obligation. The price volatility associated with the minimum royalty obligation is considered an embedded derivative financial instrument under U.S. GAAP. The fair value of the embedded derivative at September 30, 2011 and December 31, 2010 was a liability of $179.4 million and $162.0 million, respectively. During the three and nine months ended September 30, 2011, mark-to-market adjustments for this embedded derivative amounted to a loss of $14.5 million and $17.4 million, respectively. During the three and nine months ended September 30, 2010, mark-to-market adjustments for this embedded derivative and warrant amounted to a loss of $15.2 million and a gain of $1.1 million, respectively. For the three months ended September 30, 2011 and 2010, realized losses on settlement of the liabilities were $11.9 million and $4.8 million, respectively, and for the nine months ended September 30, 2011 and 2010, realized losses on settlement of the liabilities were $29.1 million and $11.6 million, respectively. The mark-to-market adjustments and realized losses are included in fair value adjustments, net in the consolidated statement of operations.

For each $1.00 increase in the price of gold, the fair value of the net derivative liability on September 30, 2011 would have increased by approximately $0.2 million. For each $1.00 decrease in the price of gold, the fair value of the net derivative liability on September 30, 2011 would have decreased by approximately $0.2 million.

### Gold Forward Contracts

The Company purchases gold contracts to reduce the risk associated with potential decreases in the market price of gold. At December 31, 2010, the Company had one outstanding forward gold contract of 10,000 ounces at a fixed price of $1,380.00, which was settled on March 22, 2011 for a gain of $0.5 million.

### Kensington Term Facility

On September 30, 2011, in connection with the Kensington term facility described in Note 10 to the Company’s Consolidated Financial Statements, Debt and Capital Lease Obligations, Kensington term facility, the Company had outstanding call options requiring it to deliver 182,500 ounces of gold at a weighted average strike price of $1,889.05 per ounce if the market price of gold exceeds the strike price. At September 30, 2011, the Company had outstanding put options allowing it to sell 205,000 ounces of gold at a weighted average strike price of $947.19 per ounce if the market price of gold were to fall below the strike price. The contracts will expire over the next five years. As of September 30, 2011 the fair market value of these contracts was a net liability of $32.9 million. During the nine months ended September 30, 2011, 32,500 ounces of gold call options at a weighted average strike price of $1,755.42 per ounce expired resulting in a realized loss of $1.9 million and 38,750 ounces of gold put options at a weighted average strike price of $886.23 per ounce expired resulting in a realized loss of $2.3 million. In addition, 28,750 ounces of gold call options were settled in September, 2011 and the Company recorded a realized loss of $2.4 million related to the transaction.

Additional information about the Company’s derivative financial instruments may be found in Note 15 to the Company’s Consolidated Financial Statements, Derivative Financial Instruments and Fair Value of Financial Instruments.

## Controls and procedures

As filed, 1,977 characters.

### (a) Disclosure Controls and Procedures

As of the end of the period covered by this quarterly report, the Company carried out an evaluation, under the supervision and with the participation of the Company’s management, including its Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934 (the Exchange Act), and management necessarily applied its judgment in assessing the costs and benefits of such controls and procedures, which by their nature, can provide only reasonable assurance regarding management’s control objectives. The design of any system of controls is based in part upon certain assumptions about the likelihood of future events. Based upon the foregoing, the Company’s Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective and operating to provide reasonable assurance that information required to be disclosed by it in the reports it files or submits under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and to provide reasonable assurance that such information is accumulated and communicated to the Company’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

### (b) Changes in Internal Control over Financial Reporting

Based on an evaluation by the Company’s Chief Executive Officer and Chief Financial Officer, such officers concluded that there was no change in the Company’s internal control over financial reporting during the quarter ending September 30, 2011 that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting.

## Risk factors

As filed, 3,012 characters.

Item 1A (“Risk Factors”) of the Company’s Annual Report on Form 10-K for the year ended December 31, 2010 sets forth information relating to important risks and uncertainties that could materially adversely affect the Company’s business, financial condition or operating results. Those risk factors, as modified and supplemented by the risk factors in our Forms 10-Q for the quarters ended March 31, 2011 and June 30, 2011, continue to be relevant to an understanding of the Company’s business, financial condition and operating results. In addition, those risk factors have been supplemented and updated in this Form 10-Q as set forth below. References to “we,” “our” and “us” in these risk factors refer to the Company. Additional risks and uncertainties that we do not presently know or that we currently deem immaterial also may impair our business operations.

***The Company is subject to significant governmental regulations, including under the Federal Mine Safety and Health Act, and related costs and delays may negatively affect its business.***

Mining activities are subject to extensive federal, state, local and foreign laws and regulations governing environmental protection, natural resources, prospecting, development, production, post-closure reclamation, taxes, labor standards and occupational health and safety laws and regulations, including mine safety, toxic substances and other matters. The costs associated with compliance with such laws and regulations are substantial. Possible future laws and regulations, or more restrictive interpretations of current laws and regulations by governmental authorities, could cause additional expense, capital expenditures, restrictions on or suspensions of operations and delays in the development of new properties.

U.S. surface and underground mines like the Kensington and Rochester mines are continuously inspected by the U.S. Mine Safety and Health Administration (MSHA), which inspections often lead to notices of violation. Recently, the MSHA has been conducting more frequent and more comprehensive inspections.

Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, which may require corrective measures including capital expenditures, installation of additional equipment or remedial actions. In addition, any of our U.S. mines could be subject to a temporary or extended shut down as a result of a violation alleged by the MSHA. Parties engaged in mining operations or in the exploration or development of mineral properties may be required to compensate those suffering loss or damage by reason of the mining activities and may be subject to civil or criminal fines or penalties imposed for violations of applicable laws or regulations. Any such penalties, fines, sanctions or shutdowns could have a material adverse effect on our business and results of operations.

Filed Nov 7, 2011.