# Avista Corp: Form 10-Q for the period ended Mar 31, 2012

- Company: [Avista Corp](/companies/ava.md) (CIK 104918)
- Form: 10-Q
- Filed: 2012-05-04
- Accepted by EDGAR: May 4, 2012, 15:13 ET
- Period: 2012-03-31
- Accession: 0001193125-12-211678
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/104918/000119312512211678/d320310d10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/104918/000119312512211678/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2012-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2012-01-01 to 2012-03-31 | $452.3m | us-gaap:Revenues |
| Operating income | 3 months, 2012-01-01 to 2012-03-31 | $78.7m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2012-01-01 to 2012-03-31 | $19.1m | us-gaap:InterestExpense |
| Income tax | 3 months, 2012-01-01 to 2012-03-31 | $21.1m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2012-01-01 to 2012-03-31 | $38.4m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2012-01-01 to 2012-03-31 | $0.65 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2012-01-01 to 2012-03-31 | $0.66 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2012-01-01 to 2012-03-31 | 58,950,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2012-01-01 to 2012-03-31 | $121.3m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2012-01-01 to 2012-03-31 | $57.8m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2012-01-01 to 2012-03-31 | $17.1m | us-gaap:PaymentsOfDividends |
| Cash and equivalents | at 2012-03-31 | $72.7m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2012-03-31 | $607.2m | us-gaap:AssetsCurrent |
| Total assets | at 2012-03-31 | $4.25bn | us-gaap:Assets |
| Current liabilities | at 2012-03-31 | $605.0m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2012-03-31 | $2.99bn | us-gaap:Liabilities |
| Long-term debt | at 2012-03-31 | $1.17bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2012-03-31 | $7.4m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2012-03-31 | $1.21bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 93,642 characters.

### Business Segments

We have two reportable business segments as follows:

- **Avista Utilities –** an operating division of Avista Corp. that comprises our regulated utility operations. Avista Utilities generates, transmits and distributes electricity and distributes natural gas. The utility also engages in wholesale purchases and sales of electricity and natural gas.
- **Ecova –** an indirect subsidiary of Avista Corp. (79.2 percent owned as of March 31, 2012) provides energy efficiency and cost management programs and services for multi-site customers and utilities throughout North America. Ecova’s primary product lines include expense management services for utility and telecom needs as well as strategic energy management and efficiency services that include procurement, conservation, performance reporting, financial planning, facility optimization and continuous monitoring, and energy efficiency program management for commercial enterprises and utilities.

We have other businesses, including sheet metal fabrication, venture fund investments and real estate investments, Spokane Energy, as well as certain other operations of Avista Capital. These activities do not represent a reportable business segment and are conducted by various direct and indirect subsidiaries of Avista Corp., including AM&D, doing business as METALfx.

The following table presents net income (loss) attributable to Avista Corp. for each of our business segments (and the other businesses) for the three months ended March 31 (dollars in thousands):

|  | 2012 | 2011 |
| --- | ---: | ---: |
| Avista Utilities | $39,477 | $40,117 |
| Ecova | (826) | 1,707 |
| Other | (263) | 94 |
| Net income attributable to Avista Corporation | $38,388 | $41,918 |

### Executive Level Summary

### Overall

Net income attributable to Avista Corporation was $38.4 million for three months ended March 31, 2012, a decrease from $41.9 million for the three months ended March 31, 2011. This was due to a decrease in earnings at Ecova (primarily due to costs associated with completing and integrating recent acquisitions), Avista Utilities (primarily due to an increase in other operating expenses, and depreciation and amortization, as well as warmer weather that reduced retail loads, partially offset by the implementation of general rate increases), as well as the net loss from the other businesses.

### Avista Utilities

Avista Utilities is our most significant business segment. Our utility financial performance is dependent upon, among other things:

- weather conditions,
- regulatory decisions, allowing our utility to recover costs, including purchased power and fuel costs, on a timely basis, and to earn a reasonable return on investment,
- the price of natural gas in the wholesale market, including the effect on the price of fuel for generation,
- the price of electricity in the wholesale market, including the effects of weather conditions, natural gas prices and other factors affecting supply and demand, and
- the ability to obtain financing through the issuance of debt and/or equity securities, which can be affected by various factors including our credit ratings, interest rates and other capital market conditions.

In our utility operations, we regularly review the need for rate changes in each jurisdiction to improve the recovery of costs and capital investments in our generation, transmission and distribution systems. General rate increases went into effect in Idaho on October 1, 2011, in Washington on January 1, 2012, and in Oregon effective March 15, 2011 and June 1, 2011. On April 2, 2012, we filed general rate increase requests in Washington.

Our utility net income was $39.5 million for the three months ended March 31, 2012, a decrease from $40.1 million for the three months ended March 31, 2011. The decrease in utility earnings was primarily due to an increase in other operating expenses, and depreciation and amortization, partially offset by an increase in gross margin (operating revenues less resource costs). The increase in other operating expenses was primarily due to increased electric generation and distribution operation and maintenance costs, pensions and other postretirement benefits expense, and labor costs. The increase in gross margin was primarily due to general rate increases, partially offset by warmer weather that reduced retail loads.

We are making significant capital investments in generation, transmission and distribution systems to preserve and enhance service reliability for our customers and replace aging infrastructure. Utility capital expenditures were $57.8 million for the three months ended March 31, 2012. We expect utility capital expenditures to be about $250 million for the full year of 2012. These estimates of capital expenditures are subject to continuing review and adjustment (see discussion under “Avista Utilities Capital Expenditures”).

### Ecova

Ecova had a net loss attributable to Avista Corporation of $0.8 million for the three months ended March 31, 2012, a decrease from net income of $1.7 million for the three months ended March 31, 2011. This decrease was primarily due to $1.5 million in costs of completing the acquisitions and integrating Prenova and LPB. Depreciation and amortization increased $1.2 million due to intangibles recorded in connection with the acquisitions. In addition, Ecova’s total operating expenses increased and revenue growth, excluding the acquisitions, was slightly lower than would be expected on an annualized basis.

On November 30, 2011, Ecova acquired Prenova, an Atlanta-based energy management company. The cash paid for the acquisition of Prenova of $35.6 million was funded primarily through borrowings under Ecova’s committed credit agreement.

On January 31, 2012, Ecova acquired LPB, a Dallas-based energy management company. The cash paid for the acquisition of LPB of $50.6 million was funded by Ecova through $25.0 million of borrowings under its committed credit agreement, a $20.0 million equity infusion from existing shareholders (including Avista Capital and the other owners of Ecova), and available cash.

While we do not expect these acquisitions to have a significant impact on earnings for the full year of 2012, they increase Ecova’s market share and allow Ecova to offer its clients a broader range of services leading to potential future earnings growth.

The acquisition of Cadence Network in July 2008 was funded with the issuance of Ecova common stock. Under the transaction agreement, the previous owners of Cadence Network can exercise a right to have their shares of Ecova common stock redeemed by Ecova during July 2011 or July 2012 if Ecova is not liquidated through either an initial public offering or sale of the business to a third party. These redemption rights were not exercised in July 2011. These redemption rights expire July 31, 2012. The redemption price would be determined based on the fair market value of Ecova at the time of the redemption election as determined by certain independent parties. As of March 31, 2012, there were redeemable noncontrolling interests of $44.3 million related to these redemption rights. Should the previous owners of Cadence Network exercise their redemption rights, Ecova will seek the necessary funding through expansion of its credit facility, a capital request from existing owners, an infusion of capital from potential new investors or a combination of these sources.

We may seek to monetize all or part of our investment in Ecova in the future, regardless of whether Ecova’s minority owner redemption rights are exercised. The value of a potential monetization depends on future market conditions, growth of the business and other factors. This may provide access to public market capital and provide potential liquidity to Avista Corp. and the other owners of Ecova. There can be no assurance that such a transaction will be completed.

### Other Businesses

The net loss for these operations was $0.3 million for the three months ended March 31, 2012 compared to net income of $0.1 million for the three months ended March 31, 2011. The decline in results was primarily due to the net loss on investments in the first quarter of 2012.

### Liquidity and Capital Resources

We need to access long-term capital markets from time to time to finance capital expenditures, repay maturing long-term debt and obtain additional working capital. Our ability to access capital on reasonable terms is subject to numerous factors, many of which, including market conditions, are beyond our control. If we are unable to obtain capital on reasonable terms, it may limit or eliminate our ability to finance capital expenditures and repay maturing long-term debt. Our liquidity needs could exceed our short-term credit availability and lead to defaults on various financing arrangements. We would also likely be prohibited from paying dividends on our common stock.

We have a committed line of credit with various financial institutions in the total amount of $400.0 million with an expiration date of February 2017. As of March 31, 2012, there were $37.0 million of cash borrowings and $20.1 million in letters of credit outstanding. As of March 31, 2012, we had $342.9 million of available liquidity under this line of credit.

We expect to issue up to $100.0 million of long-term debt in 2012.

We expect to issue up to $45 million of common stock from time to time in 2012 (with the majority in the second half of the year) in order to maintain our capital structure at an appropriate level for our business. We have 0.2 million shares available to be issued under the sales agency agreement and we expect to expand this agreement. After considering the issuances of long-term debt and common stock during 2012, we expect net cash flows from operating activities, together with cash available under our $400.0 million committed line of credit agreement, to provide adequate resources to fund:

- capital expenditures,
- dividends, and
- other contractual commitments.

### Avista Utilities – Regulatory Matters

### General Rate Cases

We regularly review the need for electric and natural gas rate changes in each state in which we provide service. We will continue to file for rate adjustments to:

- provide for recovery of operating costs and capital investments, and
- provide the opportunity to improve our earned returns as allowed by regulators.

With regards to the timing and plans for future filings, the assessment of our need for rate relief and the development of rate case plans takes into consideration short-term and long-term needs, as well as specific factors that can affect the timing of rate filings. Such factors include, but are not limited to, in-service dates of major capital investments and the timing of changes in major revenue and expense items. We filed general rate cases in Washington in May 2011 (which was settled with new rates effective January 1, 2012) and in Idaho in July 2011 (which was settled with new rates effective October 1, 2011). We filed a general rate case in Washington in April 2012 and we expect to file a general rate case in Idaho in the second half of 2012.

### Washington General Rate Cases

In December 2011, the WUTC approved a settlement agreement in our electric and natural gas general rate cases filed in May 2011. As agreed to in the settlement agreement, base electric rates for our Washington customers increased by an average of 4.6 percent, which is designed to increase annual revenues by $20.0 million. Base natural gas rates for our Washington customers increased by an average of 2.4 percent, which is designed to increase annual revenues by $3.75 million. The new electric and natural gas rates became effective on January 1, 2012. No capital structure ratios or cost of capital components were specified in the settlement agreement. As part of the settlement agreement, we agreed to not file a general rate case in Washington prior to April 1, 2012.

The settlement agreement also provides for the deferral of certain generation plant maintenance costs. In order to address the variability in year-to-year maintenance costs, beginning in 2011, we are deferring changes in maintenance costs related to our Coyote Spring 2 natural gas-fired generation plant and our 15 percent ownership interest in Units 3&4 of the Colstrip generation plant. We compare actual, non-fuel, maintenance expenses for the Coyote Springs 2 and Colstrip plants with the amount of baseline maintenance expenses used to establish base retail rates, and defer the difference. The deferral will occur annually, with no carrying charge, with deferred costs being amortized over a four-year period, beginning in the year following the period costs are deferred. The amount of expense to be requested for recovery in future general rate cases would be the actual maintenance expense recorded in the test period, less any amount deferred during the test period, plus the amortization of previously deferred costs. Total net deferred costs under this mechanism in Washington were an asset of $0.1 million as of March 31, 2012 compared to a liability of $0.5 million as of December 31, 2011.

On April 2, 2012, we filed electric and natural gas general rate cases with the WUTC. We have requested an overall increase in billed electric rates of 8.8 percent (9.0 percent in base rates) and an overall increase in billed natural gas rates of 6.8 percent (7.0 percent in base rates). The filings are designed to increase annual electric revenues by $41.0 million and increase annual natural gas revenues by $10.1 million. Our requests are based on a proposed overall rate of return of 8.25 percent, with a common equity ratio of 48.4 percent and a 10.9 percent return on equity. As part of the filing, we have requested a one-year rate decrease of 2.9 percent, designed to reduce electric revenues by $13.6 million, to rebate to customers the deferred liability for the Energy Recovery Mechanism (ERM) for 2011. This rate decrease would not have any impact on Avista Corp.’s net income. The net effect of the general rate increase request of 8.8 percent coupled with the ERM rebate of 2.9 percent is an overall increase in billed electric rates of 5.9 percent. The WUTC has up to 11 months to review the filings and issue a decision.

As part of this general rate case, we have asked the WUTC to address the delay between the time costs are incurred and when customers’ rates are reviewed and approved by the WUTC. This delay is referred to as regulatory lag. We contracted with a consultant to develop an attrition study to determine the annual revenue short-fall related to regulatory lag. We proposed an attrition adjustment in this general rate case filing, based on the attrition study, which is designed to eliminate the annual revenue short-fall related to regulatory lag.

As part of the April 2, 2012 Washington general rate case filing, we have proposed certain changes to the ERM as discussed at “Power Cost Deferrals and Recovery Mechanisms.”

### Idaho General Rate Cases

In September 2011, the IPUC approved a settlement agreement in our general rate case filed in July 2011. The new electric and natural gas rates became effective on October 1, 2011. As agreed to in the settlement agreement, base electric rates for our Idaho customers increased by an average of 1.1 percent, which is designed to increase annual revenues by $2.8 million. Base natural gas rates for our Idaho customers increased by an average of 1.6 percent, which is designed to increase annual revenues by $1.1 million.

As part of the settlement agreement, we agreed not to file a general rate case seeking a change in base electric or natural gas rates effective prior to April 1, 2013. This does not preclude us from filing annual rate adjustments such as the PCA and the PGA.

The settlement agreement also provides for the deferral of certain generation plant operation and maintenance costs. In order to address the variability in year-to-year operation and maintenance costs, beginning in 2011, we are deferring changes in operation and maintenance costs related to the Coyote Spring 2 natural gas-fired generation plant and our 15 percent ownership interest in Units 3&4 of the Colstrip generation plant. We compare actual, non-fuel, operation and maintenance expenses for the Coyote Springs 2 and Colstrip plants with the amount of expenses authorized for recovery in base rates in the applicable deferral year, and defer the difference from that currently authorized. The deferral will occur annually, with no carrying charge, with deferred costs being amortized over a three-year period, beginning in the year following the period costs are deferred. The amount of expense to be requested for recovery in future general rate cases will be the actual operation and maintenance expense recorded in the test period, less any amount deferred during the test period, plus the amortization of previously deferred costs. Total net deferred costs under this mechanism in Idaho were an asset of $0.4 million as of March 31, 2012 compared to an asset of $0.1 million as of December 31, 2011.

### Oregon General Rate Cases

In March 2011, the OPUC approved an all-party settlement stipulation in our general rate case that was filed in September 2010. The settlement provides for an overall rate increase of 3.1 percent for our Oregon customers, designed to increase annual revenues by $3.0 million. Part of the rate increase became effective March 15, 2011, with the remaining increase effective June 1, 2011. An additional rate adjustment designed to increase revenues by $0.6 million is proposed to occur on June 1, 2012 to recover capital costs associated with certain reinforcement and replacement projects upon a demonstration that such projects are complete and the costs were prudently incurred.

### Proposed Electric Decoupling–Washington

In the September 2011 Washington general rate case settlement (which was approved by the WUTC in December 2011), one party, the Northwest Energy Coalition (NWEC), did not sign the agreement and is pursuing an electric decoupling mechanism in Washington. The issue of electric decoupling is being addressed through a separate procedural schedule. Decoupling would separate the link between actual kWh sales and the recovery of our fixed costs. In summary, the NWEC proposes that actual fixed cost recovery per customer be compared to authorized fixed cost recovery per customer, and that any difference be deferred for later surcharge or rebate to customers. The current schedule would provide for a decision by the WUTC in the second half of 2012. If the WUTC adopted a decoupling mechanism, this could affect future rates and our results of operations. However, there are many variables that could be incorporated into a decoupling mechanism, and we cannot currently predict the design of the mechanism, if any, the WUTC might ultimately adopt or the affect that any mechanism adopted may have on future rates or our results of operations.

### Purchased Gas Adjustments

Effective March 1, 2012, natural gas rates decreased 6.4 percent in Washington and 6.0 percent in Idaho. Effective October 1, 2011, natural gas rates increased 1.0 percent in Idaho. Effective November 1, 2011, natural gas rates increased 1.0 percent in Washington, while decreasing 0.2 percent in Oregon. In Oregon, we absorb (gain or loss) 10 percent of the difference between actual and projected gas costs for supply that is not hedged. Total net deferred natural gas costs were a liability of $15.2 million as of March 31, 2012, compared to $12.1 million as of December 31, 2011. PGAs are designed to pass through changes in natural gas costs to our customers with no change in gross margin (operating revenues less resource costs) or net income.

### Power Cost Deferrals and Recovery Mechanisms

The Energy Recovery Mechanism (ERM) is an accounting method used to track certain differences between actual power supply costs, net of the margin on wholesale sales and sales of fuel, and the amount included in base retail rates for our Washington customers. In the 2010 Washington general rate case settlement, the parties agreed that there would be no deferrals under the ERM in 2010. Deferrals under the ERM resumed in 2011. Total net deferred power costs under the ERM were a liability of $13.5 million as of March 31, 2012 compared to $12.9 million as of December 31, 2011. As part of our April 2, 2012 general rate case filing, we have requested a one-year rate decrease of 2.9 percent to rebate to customers the 2011 deferred liability for the ERM.

The difference in net power supply costs under the ERM primarily results from changes in:

- short-term wholesale market prices and sales and purchase volumes,
- the level of hydroelectric generation,
- the level of thermal generation (including changes in fuel prices), and
- retail loads.

Under the ERM, we absorb the cost or receive the benefit from the initial amount of power supply costs in excess of or below the level in retail rates, which is referred to as the deadband. The annual (calendar year) deadband amount is currently $4.0 million. We incur the cost of, or receive the benefit from, 100 percent of this initial power supply cost variance. We share annual power supply cost variances between $4.0 million and $10.0 million with customers. There is a 50 percent customers/50 percent Company sharing when actual power supply expenses are higher (surcharge to customers) than the amount included in base retail rates within this band. There is a 75 percent customers/25 percent Company sharing when actual power supply expenses are lower (rebate to customers) than the amount included in base retail rates within this band. To the extent that the annual power supply cost variance from the amount included in base rates exceeds $10.0 million, there is 90 percent customers/10 percent Company sharing of the cost variance. The following is a summary of the ERM:

| Annual Power Supply Cost Variability | Deferred for Future Surcharge or Rebate to Customers | Expense or Benefit to the Company |
| --- | ---: | ---: |
| +/- $0 - $4 million | 0% | 100% |
| + between $4 million - $10 million | 50% | 50% |
| - between $4 million - $10 million | 75% | 25% |
| +/- excess over $10 million | 90% | 10% |

Under the ERM, we make an annual filing on or before April 1 of each year to provide the opportunity for the WUTC staff and other interested parties to review the prudence of and audit the ERM deferred power cost transactions for the prior calendar year. We made our annual filing on March 29, 2012. The ERM provides for a 90-day review period for the filing; however, the period may be extended by agreement of the parties or by WUTC order.

Under the terms of a prior settlement, we were required to make a filing (no sooner than June 2011), to allow all interested parties the opportunity to review the ERM, and make recommendations to the WUTC related to the continuation, modification or elimination of the ERM.

As part of our April 2, 2012 general rate case filing we proposed a continuation and modification of the ERM. Among the proposed changes, is a proposal for the entire power supply cost variance to be shared 90 percent customers/10 percent Company, consistent with our Power Cost Adjustment (PCA) mechanism in Idaho. We have also proposed that customers’ rates be adjusted on an annual basis to provide a surcharge or rebate to customers for any deferral balance resulting from the ERM in the prior calendar year.

We have a PCA mechanism in Idaho that allows us to modify electric rates on October 1 of each year with IPUC approval. Under the PCA mechanism, we defer 90 percent of the difference between certain actual net power supply expenses and the amount included in base retail rates for our Idaho customers. The October 1 rate adjustments recover or rebate power supply costs deferred during the preceding July-June twelve-month period. Total net power supply costs deferred under the PCA mechanism were a regulatory liability of $1.4 million as of March 31, 2012 compared to $0.7 million as of December 31, 2011.

### Natural Gas Safety Regulations

On February 3, 2012, President Obama signed into law the “Pipeline Safety, Regulatory Certainty and Job Creation Act of 2011” mandating new regulations be created to address public safety concerns. Regulations include requiring automatic shut-off valves on pipeline mains, increased installation of excess flow valves on gas service piping, increased “high consequence area” boundaries as well as to provide additional scrutiny on existing emergency preparedness plans, quality assurance plans and damage prevention programs, and broader federal oversight including broader use of fines and penalties to pipeline operators. We are evaluating the Act and cannot predict the impact the Act may ultimately have on our operations.

In addition, the Pipeline and Hazardous Materials Safety Administration issued an Advisory Bulletin in January 2011 to remind operators of gas and hazardous liquid pipeline facilities of their responsibilities, under federal integrity management regulations, to perform detailed threat and risk analyses especially with regards to their pipelines’ maximum allowable operating pressures. While we believe that we operate our pipeline systems in a safe manner, we cannot predict the impact of any future regulations or inspections on our natural gas system.

### Results of Operations

The following provides an overview of changes in our Condensed Consolidated Statements of Income. More detailed explanations are provided, particularly for operating revenues and operating expenses, in the business segment discussions (Avista Utilities, Ecova and the other businesses) that follow this section.

Utility revenues decreased $32.2 million, after elimination of intracompany revenues of $27.6 million in the first quarter of 2012 and $17.0 million in the first quarter of 2011. Including intracompany revenues, electric revenues decreased $15.9 million and natural gas revenues decreased $5.7 million. Retail electric revenues decreased $3.4 million due to a decrease in volumes sold caused by warmer weather during the first three months of 2012 compared to 2011, partially offset by general rate increases. In addition, sales of fuel decreased $19.3 million (reflecting higher usage of our thermal generating plants and decreased sales of natural gas fuel not used in generation). These decreases in retail electric revenues and sales of fuel were partially offset by an increase in wholesale electric revenues of $6.0 million (due to an increase in volumes, partially offset by a decrease in wholesale prices). Retail natural gas revenues decreased $4.4 million due to a decrease in volumes caused by warmer weather, partially offset by rate increases, while wholesale natural gas revenues decreased $0.7 million.

Non-utility revenues increased $7.9 million to $46.8 million primarily as a result of Ecova’s revenues increasing due to growth in expense management and energy management services, as well as the acquisitions of Prenova effective November 30, 2011 and LPB effective January 31, 2012.

Utility resource costs decreased $37.1 million, after elimination of intracompany resource costs of $27.6 million in the first quarter of 2012 and $17.0 million in the first quarter of 2011. Including intracompany resource costs, electric resource costs decreased $19.1 million and natural gas resource costs decreased $7.4 million. The decrease in electric resource costs was primarily due to a decrease in other fuel costs (represents fuel that was purchased for generation but was later sold when conditions indicated that it was not economical to use the fuel for generation as part of the resource optimization process) and the amortization of deferred power supply costs, partially offset by an increase in fuel costs (due to higher thermal generation). The decrease in natural gas resource costs was primarily due to a decrease in natural gas purchased due to a decrease in prices, partially offset by an increase in volumes.

Utility other operating expenses increased $3.7 million primarily due to increased electric generation and distribution operation and maintenance costs, pensions and other postretirement benefits expense, and labor costs.

Utility depreciation and amortization increased $1.5 million driven by additions to utility plant.

Non-utility other operating expenses increased $12.5 million primarily due to an increase of $11.8 million for Ecova reflecting increased costs necessary for business growth and the acquisitions of Prenova and LPB, including transaction and integration costs of $1.5 million.

Non-utility depreciation and amortization increased $1.1 million primarily due to the amortization of intangibles recorded in connection with the acquisitions of Prenova and LPB.

Interest expense increased $0.7 million primarily due to the issuance of long-term debt in December 2011 that increased the balance of long-term debt outstanding.

Income taxes decreased $2.5 million and our effective tax rate was 35.6 percent for the three months ended March 31, 2012 compared to 35.8 percent for the three months ended March 31, 2011. This decrease in expense was primarily due to a decrease in income before income taxes.

### Avista Utilities

Net income for Avista Utilities was $39.5 million for the three months ended March 31, 2012, a decrease from $40.1 million for the three months ended March 31, 2011. Avista Utilities’ income from operations was $79.1 million for the three months ended March 31, 2012 compared to $79.5 million for the three months ended March 31, 2011. The decrease in net income and income from operations was primarily due to an increase in other operating expenses, and depreciation and amortization, partially offset by an increase in gross margin (operating revenues less resource costs). The decrease in net income from Avista Utilities was also due to an increase in interest expense.

The following table presents our operating revenues, resource costs and resulting gross margin for the three months ended March 31 (dollars in thousands):

|  | Electric 2012 | 2011 | Natural Gas 2012 | 2011 | Intracompany 2012 | 2011 | Total 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating revenues | $256,056 | $271,952 | $177,500 | $183,231 | $(27,646) | $(17,036) | $405,910 | $438,147 |
| Less: resource costs | 117,932 | 137,049 | 120,726 | 128,108 | (27,646) | (17,036) | 211,012 | 248,121 |
| Gross margin | $138,124 | $134,903 | $56,774 | $55,123 | $— | $— | $194,898 | $190,026 |

Avista Utilities’ operating revenues decreased $32.2 million and resource costs decreased $37.1 million, which resulted in an increase of $4.9 million in gross margin. The gross margin on electric sales increased $3.2 million and the gross margin on natural gas sales increased $1.7 million. The increase in electric and natural gas gross margin was primarily due to general rate increases, partially offset by warmer weather that reduced retail loads. For the three months ended March 31, 2012, we recognized a benefit of $4.2 million under the ERM in Washington compared to $4.9 million for the three months ended March 31, 2011.

Intracompany revenues and resource costs represent purchases and sales of natural gas between our natural gas distribution operations and our electric generation operations (as fuel for our generation plants). These transactions are eliminated in the presentation of total results for Avista Utilities and in the consolidated financial statements.

The following table presents our utility electric operating revenues and megawatt-hour (MWh) sales for the three months ended March 31 (dollars and MWhs in thousands):

|  | Electric Operating Revenues 2012 | 2011 | Electric Energy MWh sales 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| Residential | $98,768 | $103,245 | 1,120 | 1,175 |
| Commercial | 72,222 | 70,190 | 782 | 775 |
| Industrial | 28,466 | 29,449 | 497 | 514 |
| Public street and highway lighting | 1,784 | 1,758 | 6 | 7 |
| Total retail | 201,240 | 204,642 | 2,405 | 2,471 |
| Wholesale | 25,017 | 19,051 | 886 | 596 |
| Sales of fuel | 25,043 | 44,372 | — | — |
| Other | 4,756 | 3,887 | — | — |
| Total | $256,056 | $271,952 | 3,291 | 3,067 |

Retail electric revenues decreased $3.4 million due to a decrease in total MWhs sold (decreased revenues $5.5 million) primarily due to a decrease in use per customer as a result of warmer weather, partially offset by an increase in revenue per MWh (increased revenues $2.1 million). Compared to the first quarter of 2011, residential electric use per customer decreased 5 percent. The increase in revenue per MWh was primarily due to the Washington and Idaho general rate increases.

Wholesale electric revenues increased $6.0 million due to an increase in sales volumes (increased revenues $8.2 million), partially offset by a decrease in sales prices (decreased revenues $2.2 million). The increase in sales volumes was primarily due to increased wholesale power optimization and lower than expected retail sales caused by warmer weather.

When electric wholesale market prices are below the cost of operating our natural gas-fired thermal generating units, we sell the natural gas purchased for generation in the wholesale market rather than operate the generating units. The revenues from sales of fuel decreased $19.3 million due to a decrease in sales of natural gas fuel as part of thermal generation resource optimization activities and higher usage of our thermal generation plants in 2012 as compared to 2011. This was due in part to decreased hydroelectric generation. In the first quarter of 2012, $16.8 million of these sales were made to our natural gas operations and are included as intracompany revenues and resource costs. In the first quarter of 2011, $6.4 million of these sales were made to our natural gas operations.

The net margin on wholesale sales and sales of fuel is applied to reduce or increase resource costs as accounted for under the ERM, the PCA mechanism, and in general rate cases as part of base power supply costs.

The following table presents our utility natural gas operating revenues and therms delivered for the three months ended March 31 (dollars and therms in thousands):

|  | Natural Gas Operating Revenues 2012 | 2011 | Natural Gas Therms Delivered 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| Residential | $84,833 | $87,177 | 82,564 | 85,458 |
| Commercial | 42,625 | 44,585 | 48,296 | 50,332 |
| Interruptible | 750 | 829 | 1,385 | 1,458 |
| Industrial | 1,283 | 1,281 | 1,696 | 1,659 |
| Total retail | 129,491 | 133,872 | 133,941 | 138,907 |
| Wholesale | 44,340 | 45,022 | 157,936 | 114,531 |
| Transportation | 1,900 | 1,804 | 44,530 | 44,595 |
| Other | 1,769 | 2,533 | 181 | 233 |
| Total | $177,500 | $183,231 | 336,588 | 298,266 |

Retail natural gas revenues decreased $4.4 million due to a decrease in volumes (decreased revenues $4.8 million), partially offset by slightly higher retail rates (increased revenues $0.4 million). We sold less retail natural gas in the first quarter of 2012 as compared to the first quarter of 2011 primarily due to warmer weather. Compared to the first quarter of 2011, residential natural gas use per customer decreased 4 percent and commercial use per customer decreased 5 percent.

Wholesale natural gas revenues decreased $0.7 million due to a decrease in prices (decreased revenues $12.8 million), partially offset by an increase in volumes (increased revenues $12.1 million). We plan for sufficient natural gas capacity to serve our retail customers on a theoretical peak day. As such, we generally have more pipeline and storage capacity than what is needed. We engage in optimization of available interstate pipeline transportation and storage capacity through wholesale purchases and sales of natural gas to generate economic value that offsets net natural gas costs. We hedge against expected natural gas volumes with forward purchases. In some situations, customer demand is below the amount hedged and we sell natural gas in excess of load requirements. In the first quarter of 2012, $10.8 million of these sales were made to our electric generation operations and are included as intracompany revenues and resource costs. In the first quarter of 2011, $10.6 million of these sales were made to our electric generation operations. Differences between revenues and costs from sales of resources in excess of retail load requirements and from resource optimization are accounted for through the PGA mechanisms.

The following table presents our average number of electric and natural gas retail customers for the three months ended March 31:

|  | Electric Customers 2012 | 2011 | Natural Gas Customers 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| Residential | 318,586 | 317,149 | 286,862 | 285,167 |
| Commercial | 39,803 | 39,575 | 33,821 | 33,636 |
| Interruptible | — | — | 37 | 36 |
| Industrial | 1,388 | 1,367 | 259 | 249 |
| Public street and highway lighting | 457 | 454 | — | — |
| Total retail customers | 360,234 | 358,545 | 320,979 | 319,088 |

The following table presents our utility resource costs for the three months ended March 31 (dollars in thousands):

| Electric resource costs: | 2012 | 2011 |
| --- | ---: | ---: |
| Power purchased | $51,292 | $54,561 |
| Power cost amortizations, net | 1,138 | 10,759 |
| Fuel for generation | 27,977 | 15,968 |
| Other fuel costs | 28,254 | 47,212 |
| Other regulatory amortizations, net | 4,541 | 3,962 |
| Other electric resource costs | 4,730 | 4,587 |
| Total electric resource costs | 117,932 | 137,049 |
| Natural gas resource costs: |  |  |
| Natural gas purchased | 113,955 | 128,299 |
| Natural gas cost amortizations, net | 2,960 | (6,809) |
| Other regulatory amortizations, net | 3,811 | 6,618 |
| Total natural gas resource costs | 120,726 | 128,108 |
| Intracompany resource costs | (27,646) | (17,036) |
| Total resource costs | $211,012 | $248,121 |

40

Power purchased decreased $3.2 million due to a decrease in wholesale prices (decreased costs $4.5 million), partially offfset by an increase in the volume of power purchases (increased costs $1.3 million).

Net amortization of deferred power costs was $1.1 million for the first quarter of 2012 compared to $10.8 million for the first quarter of 2011. During the first quarter of 2012, we recovered (collected as revenue) $0.6 million of previously deferred power costs in Idaho through the PCA surcharge. The Washington ERM surcharge was eliminated in February 2010, since the previous balance of deferred power costs had been recovered. During the first quarter of 2012, actual power supply costs were below the amount included in base retail rates and we deferred $0.5 million in Washington for potential future rebate to customers.

Fuel for generation increased $12.0 million primarily due to an increase in thermal generation. This was due in part to a decrease in hydroelectric generation. The increase in thermal generation usage was partially offset by a decrease in natural gas fuel prices.

Other fuel costs decreased $19.0 million. This represents fuel that was purchased for generation but was later sold when conditions indicated that it was not economical to use the fuel for generation, as part of the resource optimization process. The associated revenues are reflected as sales of fuel.

The expense for natural gas purchased decreased $14.3 million due to a decrease in the price of natural gas (decreased costs $23.1 million), partially offset by an increase in total therms purchased (increased costs $8.8 million). Total therms purchased increased due to an increase in wholesale sales with the balancing of loads and resources as part of the natural gas procurement and resource optimization process. We engage in optimization of available interstate pipeline transportation and storage capacity through wholesale purchases and sales of natural gas to generate economic value that offsets net natural gas costs.

### Ecova

Ecova’s net loss attributable to Avista Corp. was $0.8 million for the three months ended March 31, 2012 compared to net income of $1.7 million for the three months ended March 31, 2011. Operating revenues increased $7.9 million and total operating expenses increased $12.9 million. The increase in operating revenues was primarily due to the acquisitions of Prenova effective November 30, 2011 and LPB effective January 31, 2012, which added $5.2 million to operating revenues for the first quarter of 2012. The increase in total operating expenses primarily reflects increased costs necessary to support ongoing and future business growth, as well as to support the increased revenue volume obtained through the acquisitions. Ecova experienced increases in employee costs, facilities costs, information technology costs and professional fees. In addition, Ecova incurred $1.5 million in transaction and integration costs, and $0.3 million paid for the early termination of an earn-out contract. Depreciation and amortization increased $1.2 million due to intangibles recorded in connection with the acquisitions. As of March 31, 2012, Ecova had 749 expense management customers representing 539,000 billed sites in North America. In the first quarter of 2012, Ecova managed bills totaling $4.4 billion, a decrease of $0.4 billion as compared to the first quarter of 2011. This decrease was due to a decrease in the average value of each bill (due in part to a decline in natural gas prices), partially offset by an increase in accounts managed.

### Other Businesses

The net loss from these operations was $0.3 million for the three months ended March 31, 2012 compared to net income of $0.1 million for the three months ended March 31, 2011. Earnings attributable to Avista Corporation from METALfx were $0.3 million for each of the first quarters of 2012 and 2011. Losses on investments were $0.4 million for the first quarter of 2012 compared to gains of $0.1 million for the first quarter of 2011.

### Critical Accounting Policies and Estimates

The preparation of our consolidated financial statements in conformity with accounting principles generally accepted in the United States of America requires us to make estimates and assumptions that affect amounts reported in the consolidated financial statements. Changes in these estimates and assumptions are considered reasonably possible and may have a material effect on our consolidated financial statements and thus actual results could differ from the amounts reported and disclosed herein. Our critical accounting policies that require the use of estimates and assumptions were discussed in detail in the 2011 Form 10-K and have not changed materially from that discussion.

### Liquidity and Capital Resources

### Review of Condensed Consolidated Cash Flow Statement

**Overall** During the three months ended March 31, 2012, positive cash flows from operating activities of $121.3 million were used to fund the majority of our cash requirements. These cash requirements included utility capital expenditures of $57.8 million and dividends of $17.1 million.

**Operating Activities** Net cash provided by operating activities was $121.3 million for the three months ended March 31, 2012 compared to $103.3 million for the three months ended March 31, 2011. Net cash provided by working capital components was $49.2 million for the three months ended March 31, 2012, compared to $23.7 million for the three months ended March 31, 2011. The net cash provided during the first quarter of 2012 primarily reflects positive cash flows from other current assets (primarily related to a decrease in income taxes receivable), net cash inflows related to accounts receivable and a seasonal decrease in natural gas stored. These positive cash flows were partially offset by net cash outflows related to accounts payable.

The net cash provided during the first quarter of 2011 primarily reflects positive cash flows from accounts receivable (representing a seasonal decrease in receivables outstanding at Avista Utilities and Ecova), a decrease in materials and supplies, fuel stock and natural gas stored, and a decrease in other current assets (primarily due to a decrease in income taxes receivable).

Contributions to our defined benefit pension plan were $14.7 million for the first quarter of 2012 compared to $8.5 million for the first quarter of 2011. Cash paid for interest was $6.7 million for the first quarter of 2012, compared to $6.4 million for the first quarter of 2011.

**Investing Activities** Net cash used in investing activities was $154.3 million for the three months ended March 31, 2012, compared to net cash provided of $0.2 million for the three months ended March 31, 2011. Utility property capital expenditures increased by $8.1 million for the first quarter of 2012 as compared to the first quarter of 2011. In the first quarter of 2012, a significant portion of Ecova’s funds held for clients were held as securities available for sale (purchases of $36.5 million and sales of $27.0 million). In the first quarter of 2011, the funds held for clients were in cash and cash equivalents, as well as money market funds. The net cash paid by subsidiaries for acquisitions in the first quarter of 2012 of $50.3 million primarily represents Ecova’s acquisition of LPB.

**Financing Activities** Net cash provided by financing activities was $31.1 million for the three months ended March 31, 2012 compared to net cash used of $111.0 million for the three months ended March 31, 2011. During the first quarter of 2012, short-term borrowings on Avista Corp.’s committed line of credit decreased $24.0 million. Borrowings on Ecova’s committed line of credit increased $25.0 million and these proceeds were used to fund the acquisition of LPB. Cash dividends paid increased to $17.1 million (or 29 cents per share) for the first quarter of 2012 from $15.8 million (or 27.5 cents per share) for the first quarter of 2011. Client fund obligations at Ecova increased $45.2 million.

During the first quarter of 2011, our short-term borrowings decreased $45.0 million. We issued $8.5 million of common stock during the first quarter of 2011, including $5.8 million under a sales agency agreement. Additionally, client fund obligations at Ecova decreased by $47.6 million.

### Overall Liquidity

Our consolidated operating cash flows are primarily derived from the operations of Avista Utilities. The primary source of operating cash flows for our utility operations is revenues from sales of electricity and natural gas. Significant uses of cash flows from our utility operations include the purchase of power, fuel and natural gas, and payment of other operating expenses, taxes and interest, with any excess being available for other corporate uses such as capital expenditures and dividends.

We design operating and capital budgets to control operating costs and to direct capital expenditures to choices that support immediate and long-term strategies, particularly for our regulated utility operations. In addition to operating expenses, we have continuing commitments for capital expenditures for construction, improvement and maintenance of utility facilities.

Over time, our operating cash flows usually do not fully support the amount required for utility capital expenditures. As such, from time to time, we need to access long-term capital markets in order to fund these needs as well as fund maturing debt. See further discussion at “Capital Resources.”

We periodically file for rate adjustments for recovery of operating costs and capital investments to provide the opportunity to improve our earned returns as allowed by regulators. See further details in the section “Avista Utilities - Regulatory Matters.”

For our utility operations, when power and natural gas costs exceed the levels currently recovered from retail customers, net cash flows are negatively affected. Factors that could cause purchased power and natural gas costs to exceed the levels currently recovered from our customers include, but are not limited to, higher prices in wholesale markets when we buy energy or an increased need to purchase power in the wholesale markets. Factors beyond our control that could result in an increased need to purchase power in the wholesale markets include, but are not limited to:

- increases in demand (either due to weather or customer growth),
- low availability of streamflows for hydroelectric generation,
- unplanned outages at generating facilities, and
- failure of third parties to deliver on energy or capacity contracts.

We monitor the potential liquidity impacts of increasing energy commodity prices and other increased operating costs for our utility operations. We believe that we have adequate liquidity to meet the increased cash needs of potentially higher energy commodity prices and increased other operating costs through our $400.0 million committed line of credit.

As of March 31, 2012, we had $342.9 million of available liquidity under our committed line of credit. With our $400.0 million credit facility that expires in February 2017, we believe that we have adequate liquidity to meet our needs for the next 12 months.

Our utility has regulatory mechanisms in place that provide for the deferral and recovery of the majority of power and natural gas supply costs. However, if prices rise above the level currently allowed in retail rates in periods when we are buying energy, deferral balances would increase, negatively affecting our cash flow and liquidity until such time as these costs, with interest, are recovered from customers.

### Credit and Nonperformance Risk

Our contracts for the purchase and sale of energy commodities can require collateral in the form of cash or letters of credit. As of March 31, 2012, we had cash deposited as collateral of $20.5 million and letters of credit of $12.5 million outstanding related to our energy derivative contracts. Price movements and/or a downgrade in our credit ratings may impact further the amount of collateral required. See “Credit Ratings” for further information. For example, in addition to limiting our ability to conduct transactions, if our credit ratings were lowered to below “investment grade”, based on our positions outstanding at March 31, 2012, we would potentially be required to post additional collateral of up to $30.3 million. The additional collateral amount is different from the amount disclosed in “Note 5 of the Notes to Condensed Consolidated Financial Statements” because this analysis includes contracts that are not considered derivatives and due to the assumptions about potential energy price changes.

Under the terms of interest rate swap agreements that we enter into periodically, we may be required to post cash or letters of credit as collateral depending on fluctuations in the fair value of the instrument. This has not historically been significant to our liquidity position. As of March 31, 2012, we had interest rate swap agreements outstanding with a notional amount totaling $160 million and we did not have any collateral posted. If our credit ratings were lowered to below “investment grade” based on our interest rate swap agreements outstanding at March 31, 2012, we would potentially be required to post additional collateral of up to $4.3 million.

### Dodd-Frank Wall Street Reform and Consumer Protection Act

The Dodd-Frank Wall Street Reform and Consumer Protection Act (Dodd-Frank Act) was enacted into law in July 2010. The Dodd-Frank Act establishes regulatory jurisdiction by the Commodity Futures Trading Commission (CFTC) and the Securities and Exchange Commission (SEC) for certain swaps (which include a variety of derivative instruments) and the users of such swaps, that previously had been largely exempted from regulation.

A variety of rules must be adopted by federal agencies (including the CFTC, SEC and the FERC) to implement the Dodd-Frank Act. These rules being developed and implemented will clarify the impact of the Dodd-Frank Act on Avista Corp., which may be significant.

Under the Dodd-Frank Act, “Swap Dealers” and “Major Swap Participants” generally will be required to collect minimum initial and variation margin from their counterparties for non-cleared swaps. However, the requirement varies with the type of counterparty and the regulator of the “Major Swap Participant” or “Swap Dealer.” Avista Corp. should be categorized as a counterparty that is a non-financial end user for the purposes of the Dodd-Frank Act, i.e., as a non-financial entity that engages in derivatives to hedge commercial risk. In April 2012, the SEC and the CFTC issued a joint final rule with respect to security-based swap dealers or security-based major swap participants. Based on the proposed definitions and the de minimis rule, we believe that Avista Corp. is unlikely to be classified as a security-based swap dealer or security-based major swap participant. However, notwithstanding levels of margin required by regulation (or the lack thereof), concern remains that swap dealer and major swap participant counterparties will pass along their increased capital and interdealer margin costs through higher prices and reductions in thresholds for posting.

The Dodd-Frank Act also requires certain swaps to be cleared and traded on exchanges or swap execution facilities. Such clearing requirements would result in a significant change from our current practice of bilaterally negotiated credit terms. An exemption to mandatory clearing is available under the Dodd-Frank Act for counterparties that are non-financial end users using swaps to hedge commercial risk. However, the cost of entering into a non-cleared swap that is available as a cleared swap may be greater and margin levels are expected to be higher.

We will continue to monitor developments including certain proposals to delay various implementation steps defined in the Act. We cannot predict the impact the Dodd-Frank Act may ultimately have on our operations.

### Capital Resources

Our consolidated capital structure, including the current portion of long-term debt and short-term borrowings, and excluding noncontrolling interests, consisted of the following as of March 31, 2012 and December 31, 2011 (dollars in thousands):

|  | March 31, 2012 Amount | Percent of total | December 31, 2011 Amount | Percent of total |
| --- | ---: | ---: | ---: | ---: |
| Current portion of long-term debt | $7,409 | 0.3% | $7,474 | 0.3% |
| Current portion of nonrecourse long-term debt | 13,984 | 0.6 | 13,668 | 0.5 |
| Short-term borrowings | 47,000 | 1.8 | 96,000 | 3.8 |
| Long-term borrowings under committed line of credit | 50,000 | 1.9 | — | — |
| Long-term debt to affiliated trusts | 51,547 | 2.0 | 51,547 | 2.0 |
| Nonrecourse long-term debt | 29,181 | 1.1 | 32,803 | 1.3 |
| Long-term debt | 1,170,175 | 45.4 | 1,169,826 | 45.7 |
| Total debt | 1,369,296 | 53.1 | 1,371,318 | 53.6 |
| Total Avista Corporation stockholders’ equity | 1,208,139 | 46.9 | 1,185,701 | 46.4 |
| Total | $2,577,435 | 100.0% | $2,557,019 | 100.0% |

We need to finance capital expenditures and acquire additional funds for operations from time to time. The cash requirements needed to service our indebtedness, both short-term and long-term, reduces the amount of cash flow available to fund capital expenditures, purchased power, fuel and natural gas costs, dividends and other requirements. Our stockholders’ equity increased $22.4 million during the first quarter of 2012 primarily due to net income, partially offset by dividends.

We generally fund capital expenditures with a combination of internally generated cash and external financing. The level of cash generated internally and the amount that is available for capital expenditures fluctuates depending on a variety of factors. Cash provided by our utility operating activities, as well as issuances of long-term debt and common stock, are expected to be the primary source of funds for operating needs, dividends and capital expenditures for 2012. Borrowings under our $400.0 million committed line of credit will supplement these funds to the extent necessary.

We are planning to issue up to $45 million of common stock from time to time in 2012 (with the majority in the second half of the year) in order to maintain our capital structure at an appropriate level for our business. As of March 31, 2012, we had 0.2 million shares available to be issued under this agreement and we expect to expand this agreement.

We expect to issue up to $100.0 million of long-term debt in 2012.

We have a committed line of credit with various financial institutions in the total amount of $400.0 million with an expiration date of February 2017.

Our committed line of credit agreement contains customary covenants and default provisions, including a covenant which does not permit our ratio of “consolidated total debt” to “consolidated total capitalization” to be greater than 65 percent at any time. As of March 31, 2012, we were in compliance with this covenant with a ratio of 53.1 percent.

Balances outstanding and interest rates of borrowings (excluding letters of credit) under our committed line of credit were as follows as of and for the three months ended March 31 (dollars in thousands):

|  | 2012 | 2011 |
| --- | ---: | ---: |
| Balance outstanding at end of period | $37,000 | $65,000 |
| Letters of credit outstanding at end of period | $20,090 | $22,123 |
| Maximum balance outstanding during the period | $63,500 | $110,000 |
| Average balance outstanding during the period | $18,341 | $85,383 |
| Average interest rate during the period | 1.24% | 1.19% |
| Average interest rate at end of period | 3.25% | 1.55% |

The decrease in the average balance outstanding was due in part to a new intercompany borrowing arrangement between Avista Corp. and Ecova. As part of its cash management practices and operations, Ecova and Avista Corp. entered into a master promissory note in January 2012, where Ecova will from time to time make unsecured short-term loans to Avista Corp. The master promissory note limits the total outstanding indebtedness to no more than $50.0 million in principal. Additionally, such loans are required to be repaid on the last business day of each quarter (March, June, September and December) and sooner upon demand by Ecova. Amounts are loaned at a rate consistent with Avista Corp.’s credit facility. The average balance outstanding was $32.1 million and the maximum balance was $50.0 million during the first quarter of 2012.

Any default on the line of credit or other financing arrangements of Avista Corp. or any of our significant subsidiaries could result in cross-defaults to other agreements of such entity, and/or to the line of credit or other financing arrangements of any other of such entities. Any defaults could also induce vendors and other counterparties to demand collateral. In the event of any such default, it would be difficult for us to obtain financing on reasonable terms to pay creditors or fund operations. We would also likely be prohibited from paying dividends on our common stock. Avista Corp. does not guarantee the indebtedness of any of its subsidiaries. As of March 31, 2012, Avista Corp. and its subsidiaries were in compliance with all of the covenants of their financing agreements and none of Avista Corp.’s subsidiaries constituted a “significant subsidiary” as defined in Avista Corp.’s committed line of credit.

### Avista Utilities Capital Expenditures

We expect utility capital expenditures to be about $250 million for each of 2012, 2013 and 2014. These estimates of capital expenditures are subject to continuing review and adjustment. Actual capital expenditures may vary from our estimates due to factors such as changes in business conditions, construction schedules and environmental requirements. Future generation resource decisions may be further impacted by legislation for restrictions on greenhouse gas (GHG) emissions and renewable energy requirements as discussed at “Environmental Issues and Other Contingencies.”

### Ecova Credit Agreement

Ecova has a $60.0 million committed line of credit agreement with a financial institution that has an expiration date of April 2014, which is scheduled to decrease to $55.0 million on September 30, 2012 and $50.0 million on December 31, 2012. Ecova is working towards expanding this facility through a multi-bank syndication in 2012. The credit agreement is secured by substantially all of Ecova’s assets. There were $60.0 million of borrowings outstanding under Ecova’s credit agreement as of March 31, 2012, with $10.0 million classified as short-term and $50.0 million classified as long-term. The proceeds from these borrowings were used to fund the acquisitions of Prenova in November 2011 and LPB in January 2012.

### Ecova Redeemable Stock

In 2007, Ecova amended its employee stock incentive plan to provide an annual window at which time holders of common stock can put their shares back to Ecova providing the shares are held for a minimum of six months. Stock is reacquired at estimated fair value at the date of reacquisition. As the repurchase feature is at the discretion of the minority shareholders and option holders, there were redeemable noncontrolling interests of $13.3 million as of March 31, 2012 for the intrinsic value of stock options outstanding, as well as outstanding redeemable stock. In 2009, the Ecova employee stock incentive plan was amended such that, on a prospective basis, not all options granted under the plan have the put right. Additionally, there were redeemable noncontrolling interests of $44.3 million related to the Cadence Network acquisition, as the previous owners can exercise a right to put their stock back to Ecova in July 2011 or July 2012 if Ecova is not liquidated through either an initial public offering or sale of the business to a third party. These redemption rights were not exercised in July 2011. These redemption rights expire July 31, 2012. Should the previous owners of Cadence Network exercise their redemption rights, Ecova will seek the necessary funding through expansion of its credit facility, a capital request from existing owners, an infusion of capital from potential new investors or a combination of these sources.

### Off-Balance Sheet Arrangements

As of March 31, 2012, we had $20.1 million in letters of credit outstanding under our $400.0 million committed line of credit, a decrease from $29.0 million as of December 31, 2011.

### Pension Plan

As of March 31, 2012, our pension plan had assets with a fair value that was less than the benefit obligation under the plan. We contributed $26 million to the pension plan in 2011. We expect to contribute a total of $176 million (or $44 million per year) to the pension plan in the period 2012 through 2015. In the first quarter of 2012, we contributed $14.7 million to the pension plan. The final determination of pension plan contributions for future periods is subject to multiple variables, most of which are beyond our control, including further changes to the fair value of pension plan assets and changes in actuarial assumptions (in particular the discount rate used in determining the benefit obligation).

### Credit Ratings

Our access to capital markets and our cost of capital are directly affected by our credit ratings. In addition, many of our contracts for the purchase and sale of energy commodities contain terms dependent upon our credit ratings. See “Credit and Nonperformance Risk” and “Note 5 of the Notes to Condensed Consolidated Financial Statements.” The following table summarizes our credit ratings as of May 4, 2012:

|  |  |  |
| --- | --- | --- |
|  | Standard & Poor’s (1) | Moody’s (2) |
| Corporate/Issuer rating | BBB | Baa2 |
| Senior secured debt | A- | A3 |
| Senior unsecured debt | BBB | Baa2 |

(1) Standard & Poor’s lowest level of “investment grade” credit rating is BBB-.

(2) Moody’s lowest level of “investment grade” credit rating is Baa3.

A security rating is not a recommendation to buy, sell or hold securities. Each security rating is subject to revision or withdrawal at any time by the assigning rating organization. Each security rating agency has its own methodology for assigning ratings, and, accordingly, each rating should be considered in the context of the applicable methodology, independent of all other ratings. The rating agencies provide ratings at the request of Avista Corporation and charge fees for their services.

### Dividends

The Board of Directors considers the level of dividends on our common stock on a regular basis, taking into account numerous factors including, without limitation:

- our results of operations, cash flows and financial condition,
- the success of our business strategies, and
- general economic and competitive conditions.

Our net income available for dividends is primarily derived from our regulated utility operations. The payment of dividends on common stock is restricted by provisions of certain covenants applicable to preferred stock (when outstanding) contained in our Restated Articles of Incorporation, as amended.

In February 2012, Avista Corp.’s Board of Directors declared a quarterly dividend of $0.29 per share on the Company’s common stock. This was an increase of $0.015 per share, or 5 percent from the previous quarterly dividend of $0.275 per share.

### Contractual Obligations

Our future contractual obligations have not changed materially from the amounts disclosed in the 2011 Form 10-K, with the following exceptions:

As of March 31, 2012, we had $37.0 million of borrowings outstanding under our committed line of credit. There were $61.0 million in borrowings outstanding as of December 31, 2011.

As of March 31, 2012, Ecova had $60.0 million of borrowings outstanding under its committed line of credit. There were $35.0 million in borrowings outstanding as of December 31, 2011.

Redeemable noncontrolling interests increased to $57.6 million as of March 31, 2012 from $51.8 million as of December 31, 2011.

### Economic Conditions and Utility Load Growth

The general economic data, on both national and local levels, contained in this section is based, in part, on independent government and industry publications, reports by market research firms or other independent sources. While we believe that these publications and other sources are reliable, we have not independently verified such data and can make no representation as to its accuracy.

We continue to experience customer growth as the regional economy recovers from the recession. We have three distinct metropolitan areas in our service area: Spokane, Washington, Coeur d’Alene, Idaho and Medford, Oregon; and we are tracking three separate economic indicators: employment change, unemployment rates and foreclosure rates. We have observed mixed results during the economic recovery. The March 2012 employment indicators are positive except for Spokane, unemployment rates are lower in all three areas and foreclosure rates have decreased compared to prior periods. Compared to the U.S. the economy in our service area is broadly weaker than the national average. In 2012, we expect economic growth in our service area to be lower as compared to the U.S.

Employment in our northern Idaho service area is exhibited moderate growth in March 2012 compared to March 2011. Job performance in eastern Washington has yet to show signs of recovery, while our southwestern Oregon service area has stabilized. Non-farm employment growth for March 2012 was 0.7 percent in Medford, Oregon with gains in manufacturing and retail trade offset by declines in local government. We observed an employment decline of 0.4 percent in the Spokane area with gains in manufacturing and business and professional services offset by losses in state government. Employment increased by 5.5 percent in Coeur d’Alene, Idaho and was broadly across all job categories with considerable strength in manufacturing. The U.S. nonfarm sector jobs grew by 1.5 percent in the same twelve-month period.

The unemployment rate went down in March 2012 from the year earlier level in Spokane, Medford, and Coeur d’Alene. In Spokane the rate was 10.6 percent in March 2011 and declined to 9.9 percent in March 2012. In Medford the rate declined from 12.9 percent to 11.7 percent while in Coeur d’Alene the rate went from 11.9 percent to 10.3 percent. The U.S. rate declined from 9.2 percent to 8.4 percent in the same period.

The housing market in our service area has improved when measured by foreclosure rates, with two of our three metropolitan areas better than the national average. The March 2012 national rate was 0.15 percent with a near national average level at 0.14 percent in Jackson County, Oregon. The Spokane housing market was 0.02 percent and Kootenai County, Idaho was 0.05 percent.

### Environmental Issues and Other Contingencies

We are subject to environmental regulation by federal, state and local authorities. The generation, transmission, distribution, service and storage facilities in which we have ownership interests are designed and operated in compliance with applicable environmental laws. Furthermore, we conduct periodic reviews and audits of pertinent facilities and operations to ensure compliance and to respond to or anticipate emerging environmental issues. The Company’s Board of Directors has a committee to oversee environmental issues.

We monitor legislative and regulatory developments at all levels of government for environmental issues, particularly those with the potential to impact the operation and productivity of our generating plants and other assets.

Environmental laws and regulations may:

- increase the operating costs of generating plants,
- increase the lead time and capital costs for the construction of new generating plants,
- require modification of our existing generating plants,
- require existing generating plant operations to be curtailed or shut down,
- reduce the amount of energy available from our generating plants,
- restrict the types of generating plants that can be built or contracted with, and
- require construction of specific types of generation plants at higher cost.

Compliance with environmental laws and regulations could result in increases to capital expenditures and operating expenses. We intend to seek recovery of any such costs through the ratemaking process.

### Climate Change and Greenhouse Gas Emission Reduction Initiatives

Concerns about long-term global climate changes could have a significant effect on our business. Our operations could also be affected by changes in laws and regulations intended to mitigate the risk of or alter global climate changes, including restrictions on the operation of our power generation resources and obligations imposed on the sale of natural gas. Changing temperatures and precipitation, including snowpack conditions, affect the availability and timing of streamflows, which impact hydroelectric generation. Extreme weather events could increase service interruptions, outages and maintenance costs. Changing temperatures could also increase or decrease customer demand.

Greenhouse gas (GHG) emission standards could result in significant compliance costs. Such standards could also preclude us from developing, operating or contracting with certain types of generating plants.

We continue to monitor and evaluate the possible adoption of international, national, regional, or state GHG emission legislation and regulations. As the U.S. Congress has not enacted any comprehensive climate change legislation, for the foreseeable future climate change regulations are expected to emerge from the EPA and from individual states. In particular, climate change legislation was passed in the state of Washington, which includes a bill establishing GHG emissions reduction targets and another requiring that regulated sources report GHG emission from facilities that emit more than 10,000 metric tons of GHGs per year.

Although we are actively monitoring developments for climate change policies and restrictions on GHG emissions, it is important to note that we have relatively low GHG emissions as compared to other investor-owned utilities in the U.S. With 60 percent of our electric generation resource mix derived from renewable sources (including hydroelectric, biomass and contracts with wind generation projects) and a majority of our thermal generation fueled with natural gas, plus a commitment to energy efficiency, we are among the lowest carbon-emitting utilities in the nation.

Our Climate Policy Council (an interdisciplinary team of management and other employees) works to:

- facilitate internal and external communications regarding climate change issues,
- analyze policy impacts, anticipate opportunities and evaluate strategies for Avista Corp., and
- develop recommendations on climate related policy positions and action plans.

### National Legislation

Climate change legislation has been proposed in the U.S. Congress; however, recent actions in the U.S. Congress indicate that climate change legislation is unlikely at this time. We continue to monitor the situation for new developments that could affect our business.

### Recent EPA Initiatives Related to Climate Change

After a public comment and review period, in December 2009, the EPA issued an “endangerment finding” regarding GHG emissions from motor vehicles under section 202(a) of the Clean Air Act (CAA). Specifically, the EPA found that the combined emissions of GHG from new motor vehicles and new motor vehicle engines contribute to the GHG pollution which threatens public health and welfare. The EPA’s findings are currently being challenged in the U.S. Court of Appeals for the District of Columbia Circuit. On April 1, 2010, the EPA and the Department of Transportation’s National Highway Safety Administration announced a joint final rule establishing GHG emission standards for mobile sources. The GHG emission standards for mobile sources became effective on January 2, 2011. The EPA has concluded that the CAA requires the agency to regulate GHG emissions from stationary sources through its preconstruction and operating permit programs on the date when EPA regulations require any source (mobile or stationary) to meet GHG emission limits. In May 2010, the EPA finalized a rule establishing an applicability threshold for regulating GHG emissions from stationary sources through the preconstruction and operating permit programs.

The EPA issued a series of rules on December 23, 2010 to narrow the CAA permitting requirement so that facilities with GHG emissions below the levels set in the tailoring rule do not need permits, as well as to give the EPA authority to issue GHG permits in states that need to revise their permitting regulations to cover GHG emissions. On January 2, 2011, rules took effect requiring that permits issued under the CAA for new large stationary sources begin to address GHG emissions, as well as require Best Available Control Technology (BACT) to control these emissions. On July 20, 2011, the EPA finalized a rule that defers, for a period of three years, the GHG permitting requirements for carbon dioxide for utilities, boilers and other industrial facilities using biomass. The EPA’s final decision to regulate GHG emissions from stationary sources and to establish applicability thresholds for GHGs has been challenged in the U.S. Court of Appeals for the District of Columbia.

The EPA is planning to issue regulations controlling GHG emissions from electric generating units. According to a previously announced schedule, the EPA was to propose standards for natural gas, oil and coal-fired electric generating units by September 30, 2011, and issue final standards by May 26, 2012. The EPA recently announced that it would not meet this schedule and has not yet provided a new schedule. The EPA had agreed to the original schedule as part of a settlement, as modified, with several states, local governments and environmental organizations that sued the EPA over its failure to update emissions standards for power plants and refineries as required by Section 111 of the CAA. Section 111 requires the EPA to issue New Source Performance Standards that set emissions limits for new facilities and, under certain circumstances, address emissions from existing facilities. These rules could significantly impact the costs of modifying existing thermal plants as well as building new thermal generation sources. We cannot determine or estimate the costs of compliance with such measures at this time.

In September 2009, the EPA finalized the Mandatory Reporting Rule (MRR) that requires facilities emitting over 25,000 metric tons of GHG a year to report their emissions to the EPA beginning in January 2011 for 2010 emissions. On March 18, 2011, the EPA issued a rule extending the deadline for reporting 2010 GHG emissions data to September 30, 2011. Based on rule applicability criteria, Colstrip, Coyote Springs 2, and the Rathdrum CT recently reported GHGs to the EPA. The rule also required that natural gas distribution system throughput be reported along with the development of a GHG Monitoring Plan. On March 22, 2010, the EPA proposed to further amend its reporting rule to include several new source categories, including reporting of GHG fugitive emissions from electric power transmission and distribution systems, fugitive emissions from natural gas distribution systems, and fugitive emissions from natural gas storage facilities. Reporting for these additional sources for 2011 emissions was required by March 31, 2012.

On March 27, 2012, the EPA proposed a Carbon Pollution Standard for new power plants. The EPA proposed that new fossil-fuel-fired power plants meet an output-based standard of 1,000 pounds of carbon dioxide per megawatt-hour. New power plants that are designed to use coal or petroleum coke would be able to incorporate technology to reduce carbon dioxide emissions to meet the standard, such as carbon capture and storage. For purposes of this rule, fossil-fuel-fired generation units include fossil-fuel-fired boilers, integrated gasification combined cycle units and stationary combined cycle turbine units that generate electricity for sale and are larger than 25 MW; simple cycle turbine units are exempt. The proposal would not apply to existing units including modifications such as changes needed to meet other air pollution standards and new power plant units that have permits and start construction within 12 months of this proposal. We are unable to determine if or to what extent the proposed standard, if adopted, would have on our thermal generating facilities at this time.

### State Activities

The states of Washington and Oregon have statutory targets to reduce GHG emissions. Washington’s targets are intended to reduce GHG emission to 1990 levels by 2020; to 25 percent below 1990 levels by 2035; and to 50 percent below 1990 levels by 2050. Oregon’s targets would reduce GHG emissions to 10 percent below 1990 levels by 2020 and 75 percent below 1990 levels by 2050. Both states enacted their targets expecting that they would be met through a combination of renewable energy standards, and assorted “complementary policies,” such as land-use policies, energy efficiency codes for buildings, renewable fuel standards and vehicle emission standards. However, neither state has yet adopted any comprehensive requirements aimed specifically at achieving these targets.

Washington State’s Department of Ecology has adopted regulations to ensure that its State Implementation Plan comports with the requirements of the EPA’s regulation of GHG emissions. We will continue to monitor actions by the Department as it may proceed to adopt additional regulations under its CAA authorities. Late in 2011, a Federal District Court ruled that the Department of Ecology must require six refineries located in the state to install reasonably available control technology (RACT) to control and reduce their greenhouse gas emissions. This decision turned, on the meaning of “air contaminate” under Washington law, the United States Supreme Court decision in Massachusetts v. EPA (549 U.S. 497 (2007)), and administrative actions were taken by the EPA. The Court’s decision could have implications for other industrial emitters of greenhouse gases in the state of Washington, in part because the decision will require the Department of Ecology to determine what measures might constitute RACT. If and how the decision might impact other industries will not be clear until the decision is finalized and any challenges to it have been exhausted.

Washington and Oregon apply a GHG emissions performance standard to electric generation facilities used to serve retail loads in their jurisdictions. The emissions performance standard prevents utilities from constructing or purchasing generation facilities, or entering into power purchase agreements of five years or longer duration to purchase energy produced by plants that have emission levels higher than 1,100 pounds of GHG per MWh. The Department of Commerce has commenced a process that is expected to result in the adoption of a lower emissions performance standard this year (2012); a new standard will be applicable until at least 2017.

Initiative Measure 937 (I-937), the Energy Independence Act, was passed into law through the 2006 General Election in Washington. I-937 requires investor-owned, cooperative, and government-owned electric utilities with over 25,000 customers to acquire qualified renewable energy resources and/or renewable energy credits in incremental amounts until those resources or credits equal 15 percent of the utility’s total retail load in 2020. I-937 also requires these utilities to meet biennial energy conservation targets, the first of which must be met in 2012. Furthermore, by January 1, 2012, electric utilities subject to I-937’s mandates were required to acquire enough qualified incremental renewable energy and/or renewable energy credits to meet 3 percent of their load. This renewable energy standard increases to 9 percent in 2016. Failure to comply with renewable energy and energy efficiency standards could result in penalties of $50 per MWh or greater being assessed against a utility for each MWh it is deficient in meeting a standard. A utility would be deemed to comply with the renewable energy standard if it invests at least 4 percent of its total annual retail revenue requirement on the incremental costs of renewable energy resources and/or renewable energy credits. As noted in the following section, we have taken the steps necessary to meet the requirements of I-937. In 2012, the Governor signed into law Senate Bill 5575, which amended I-937 to define our Kettle Falls Generating Station and certain other biomass energy facilities which commenced operation before March 31, 1999, as resources that may be used to meet the renewable energy standards beginning in 2016.

### Wind Power Purchase Agreement

In June 2011, we entered into a 30-year power purchase agreement (PPA) with Palouse Wind, LLC (Palouse Wind), an affiliate of First Wind Holdings, LLC. Under the PPA, we will acquire all of the power and renewable attributes produced by a wind project being developed by Palouse Wind in Whitman County, Washington. The wind project is expected to have a nameplate capacity of approximately 105 MW and produce approximately 40 aMW with deliveries beginning by the end of 2012. We decided to enter into this PPA due, in part, to market changes reducing the cost of renewable resource projects. This was due, in part, to tax incentives for the construction of renewable resource projects that remain in effect through 2012. We acquired the development rights for a separate wind generation site near Reardan, Washington in 2008 and continue to study that site in preparation for later development. We plan to meet the state of Washington’s renewable energy standards until 2016 with a combination of qualified upgrades at our existing hydroelectric generation plants. The power purchased from Palouse Wind will help to meet our Washington renewable energy requirements beginning in 2016, as well as provide a new energy resource to serve our system retail load requirements. Under the PPA, we have the option to purchase the wind project each year following the 10th anniversary of the commercial operation date at a price determined under the contract.

### Clean Air Act

We must comply with the requirements under the Clean Air Act (CAA) in operating our thermal generating plants. The CAA currently requires a Title V operating permit for Colstrip (which is in the process of being renewed), Coyote Springs 2 (which will expire in 2013), the Kettle Falls GS (which will be renewed in 2012), and the Rathdrum CT (which will expire in 2016). Boulder Park and the Northeast CT currently require only minor source operating permits based on their limited operation and emissions. The CAA also requires Acid Rain Program monitoring, reporting and emissions trading for Colstrip, Coyote Springs 2 and the Rathdrum CT. We continue to monitor legislative and regulatory developments for several programs within the CAA such as the National Ambient Air Quality Standards (NAAQS), New Source Performance Standards and the National Emission Standards for Hazardous Air Pollutants (NESHAPs) or Maximum Achievable Control Technology (MACT).

### Montana mercury regulation and the EPA’s Mercury Air Toxic Standards (MATS)

In 2006, the Montana Department of Environmental Quality (Montana DEQ) adopted final rules for the control of mercury emissions from coal-fired plants that impose strict emission limitations beginning in 2010. Colstrip installed and is successfully operating a mercury emission control system which meets the Montana mercury regulation.

The EPA finalized the MATS (formerly known as the Utility MACT) on December 16, 2011 to control hazardous air pollutants including mercury from coal and oil-fired power plants. The final version of the rule contains a mercury standard that is less stringent than the Montana mercury regulation; therefore, Colstrip’s existing emission control system should be sufficient to meet mercury compliance. For the remaining portion of the rule that specifically addresses Air Toxics (including metals and acid gases), the joint owners are currently evaluating what type of new emission control systems may be needed for MATS compliance in 2015. We are unable to determine to what extent or if there will be any material impacts to Colstrip at this time.

### National Ambient Air Quality Standards (NAAQS)

We continue to monitor legislative and regulatory developments at both the state and national levels for potential operating limitations that may result from updates to the NAAQS. The CAA requires regular updates which have been recently court mandated to occur in June 2013 for nitrogen dioxide, ozone and particulate matter. We have thermal power plants in Washington, Idaho, Montana and Oregon. Since the EPA has designated most of the western states in which we operate as attainment areas, we do not anticipate any material impacts on our thermal plants from the required updates of these new standards at this time.

### Regional Haze Program

The United States Congress addressed regional visibility in the 1990 CAA amendments and the EPA published the final Regional Haze regulations in 2005. The EPA’s regulations set a national goal of eliminating man-made visibility degradation in Class I areas by the year 2064. The states were expected to take actions through State Implementation Plans (SIPs) to make “reasonable progress” through 10-year plans, including application of Best Available Retrofit Technology (BART) requirements. In 2009, the EPA announced that many states had failed to submit the required SIPs by the 2007 deadline. In 2011, environmental groups sued the EPA for inaction which resulted in court ordered deadlines for a Montana Federal Implementation Plan (FIP) in July 2012.

BART is a retrofit program applied to large emission sources, including electric generating units built between 1962 and 1977. In February 2007, Colstrip was notified by the EPA that Colstrip Units 1 & 2 (of which we are not an owner) were determined to be subject to the EPA’s BART requirements. In November 2010, the EPA issued a request for additional reasonable progress information for Colstrip Units 3 & 4 (of which we are a 15 percent owner). The owners of Colstrip Units 3 & 4 have submitted the requested information and await the EPA’s upcoming FIP proposal, which will include the EPA’s determination of BART for Colstrip Units 3 & 4. On March 21, 2012, the EPA released a proposed Federal Implementation Plan (FIP) for Montana. The proposal includes emission limitations and pollution controls for Colstrip Units 1 & 2. Colstrip Units 3 & 4 are not currently affected, but would be evaluated for reasonable progress at the next review period in approximately five years. We will continue to evaluate this proposal for any material impacts to Colstrip Units 3 & 4. The FIP is expected to be finalized in July 2012.

### Coal Ash Management/Disposal

Currently, coal combustion byproducts (CCBs) are not regulated by the EPA as a hazardous waste. Under a proposed rule issued in 2010, the EPA is reconsidering the classification of CCBs under the Resource Conservation and Recovery Act (RCRA). The draft rules included two options: to require management of CCBs as a hazardous waste under Subtitle C of the RCRA; or to regulate coal ash under Subtitle D, for non-hazardous solid wastes, with possible special waste requirements. Should the EPA determine to regulate CCBs as a hazardous waste under the RCRA, such action could have a significant impact on future operations of Colstrip.

### Fisheries

A number of species of fish in the Northwest, including the Snake River sockeye salmon and fall chinook salmon, the Kootenai River white sturgeon, the upper Columbia River steelhead, the upper Columbia River spring chinook salmon and the bull trout, are listed as threatened or endangered under the Federal Endangered Species Act. Efforts to protect these and other species have not directly impacted generation levels at any of our hydroelectric facilities. We purchase power under long-term contracts with certain PUDs with hydroelectric generation projects on the Columbia River that are directly impacted by ongoing mitigation measures for salmon and steelhead. The reduction in generation at these projects is relatively minor, resulting in minimal economic impact on our operations at this time. We cannot predict the economic costs to us resulting from future mitigation measures. We received a 45-year FERC operating license for Cabinet Gorge and Noxon Rapids in March 2001 that incorporates a comprehensive settlement agreement. The restoration of native salmonid fish, including bull trout, is a key part of the agreement. The result is a collaborative native salmonid restoration program with the U.S. Fish and Wildlife Service, Native American tribes and the states of Idaho and Montana on the lower Clark Fork River, consistent with requirements of the FERC license. The U.S. Fish & Wildlife Service issued an updated Critical Habitat Designation for bull trout in 2010 that includes the lower Clark Fork River, as well as portions of the Coeur d’Alene basin within our Spokane River Project area, and is currently developing a final Bull Trout Recovery Plan under the ESA. Issues related to these activities are expected to be worked out through the ongoing collaborative effort of our Clark Fork and Spokane River FERC licenses. See “Hydroelectric Licensing” and “Fish Passage at Cabinet Gorge and Noxon Rapids” in “Note 11 of the Notes to Condensed Consolidated Financial Statements” for further information.

### Western Power Market Issues

The FERC continues to conduct proceedings and investigations related to market controls within the western United States that include proposals by certain parties to impose refunds, and some of the FERC’s decisions have been appealed in Federal Courts. Certain parties have asserted claims for significant refunds from us, which could result in liabilities for refunding revenues recognized in prior periods. We have joined other parties in opposing these proposals. We believe that we have adequate reserves established for refunds that may be ordered. The refund proceedings provide that any refunds would be offset against unpaid energy debts due to the same party. As of March 31, 2012, our accounts receivable outstanding related to defaulting parties in California were fully offset by reserves for uncollected amounts and funds collected from defaulting parties. See “California Refund Proceeding” and “Pacific Northwest Refund Proceeding” in “Note 11 of the Notes to Condensed Consolidated Financial Statements” for further information on the refund proceedings.

### Other

For other environmental issues and other contingencies see “Note 11 of the Notes to Condensed Consolidated Financial Statements.”

## Market risk

As filed, 3,518 characters.

Our primary market risk exposures are:

- Commodity prices for electric power and natural gas
- Credit related to the wholesale energy market
- Interest rates on long-term and short-term debt
- Foreign exchange rates between the U.S. dollar and the Canadian dollar

### Commodity Price Risk

Our qualitative commodity price risk disclosures have not materially changed during the three months ended March 31, 2012. Please refer to the 2011 Form 10-K. The following table presents energy commodity derivative fair values as a net asset or (liability) as of March 31, 2012 that are expected to settle in each respective year (dollars in thousands):

| Year | Purchases Electric Derivatives Physical | Financial | Gas Derivatives Physical | Financial | Sales Electric Derivatives Physical | Financial | Gas Derivatives Physical | Financial |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| 2012 | $(8,907) | $(18,658) | $(27,401) | $(5,295) | $2,650 | $5,166 | $387 | $11 |
| 2013 | (3,862) | (2,259) | (20,629) | (6,895) | 63 | 8,123 | (838) | (153) |
| 2014 | (2,506) | — | (6,986) | (3,021) | (90) | 1,025 | (904) | (6) |
| 2015 | (2,175) | — | (1,975) | (196) | (118) | — | — | — |
| 2016 | (2,245) | — | (364) | 68 | (136) | — | — | — |
| Thereafter | (5,158) | — | — | — | (573) | — | — | — |

### Credit Risk

Our credit risk has not materially changed during the three months ended March 31, 2012. Please refer to the 2011 Form 10-K.

### Risk Management for Energy Resources

We use a variety of techniques to manage risks for energy resources and wholesale energy market activities. We have an energy resources risk policy and control procedures to manage these risks, both qualitative and quantitative. Please refer to the 2011 Form 10-K for discussion of risk management policies and procedures.

### Interest Rate Risk

Our qualitative interest rate risk disclosures have not materially changed during the three months ended March 31, 2012. Please refer to the 2011 Form 10-K.

As of March 31, 2012, we had outstanding interest rate swap agreements with a total notional amount of $75.0 million and a mandatory cash settlement date of July 2012. We also have interest rate swap agreements with a notional amount of $85.0 million and a mandatory cash settlement date of June 2013.

As of March 31, 2012, we had a current derivative liability of $9.2 million and a long-term derivative asset of $5.1 million, with an offsetting regulatory asset on the Condensed Consolidated Balance Sheets in accordance with regulatory accounting practices. Upon settlement of the interest rate swaps, the regulatory asset or liability (included as part of long-term debt) will be amortized as a component of interest expense over the life of the forecasted interest payments.

### Foreign Currency Risk

Our qualitative foreign currency risk disclosures have not materially changed during the three months ended March 31, 2012. Please refer to the 2011 Form 10-K. As of March 31, 2012, we had a current derivative liability for foreign currency hedges of less than $0.1 million included in other current liabilities on the Condensed Consolidated Balance Sheet. As of March 31, 2012, we had entered into 31 Canadian currency forward contracts with a notional amount of $4.3 million ($4.2 million Canadian).

Further information for derivatives and fair values is disclosed at “Note 5 of the Notes to Condensed Consolidated Financial Statements” and “Note 9 of the Notes to Condensed Consolidated Financial Statements.”

## Controls and procedures

As filed, 1,998 characters.

The Company has disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934, as amended) to ensure that information required to be disclosed in the reports it files or submits under the Act is recorded, processed, summarized and reported on a timely basis. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by the Company in the reports that it files or submits under the Act is accumulated and communicated to the Company’s management, including its principal executive and principal financial officers as appropriate to allow timely decisions regarding required disclosure. Under the supervision and with the participation of the Company’s management, including the Company’s principal executive officer and principal financial officer, the Company has evaluated its disclosure controls and procedures as of the end of the period covered by this report. There are inherent limitations to the effectiveness of any system of disclosure controls and procedures, including the possibility of human error and the circumvention or overriding of the controls and procedures. Accordingly, even effective disclosure controls and procedures can only provide reasonable assurance of achieving their control objectives. Disclosure controls and procedures are designed to provide reasonable assurance of achieving their objectives. Based upon the Company’s evaluation, the Company’s principal executive officer and principal financial officer have concluded that the Company’s disclosure controls and procedures are effective at a reasonable assurance level as of March 31, 2012.

There have been no changes in the Company’s internal control over financial reporting that occurred during the first quarter of 2012 that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

## Risk factors

As filed, 791 characters.

Please refer to the 2011 Form 10-K for disclosure of risk factors that could have a significant impact on our results of operations, financial condition or cash flows and could cause actual results or outcomes to differ materially from those discussed in our reports filed with the Securities and Exchange Commission (including this Quarterly Report on Form 10-Q), and elsewhere. These risk factors have not materially changed from the disclosures provided in the 2011 Form 10-K. In addition to these risk factors, please also see “Forward-Looking Statements” for additional factors which could have a significant impact on our operations, results of operations, financial condition or cash flows and could cause actual results to differ materially from those anticipated in such statements.

Filed May 4, 2012.
Source: SEC EDGAR, the filing index for accession 0001193125-12-211678. Last ingested by Listed: Nov 6, 2026, 18:07 ET. No prices; not investment advice.