# General Dynamics Corp: Form 10-Q for the period ended Jul 1, 2012

- Company: [General Dynamics Corp](/companies/gd.md) (CIK 40533)
- Form: 10-Q
- Filed: 2012-08-01
- Accepted by EDGAR: Aug 1, 2012, 10:54 ET
- Period: 2012-07-01
- Accession: 0001193125-12-327606
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/40533/000119312512327606/d359017d10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/40533/000119312512327606/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2012-07-01.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2012-04-02 to 2012-07-01 | $7.92bn | us-gaap:Revenues |
| Revenue | 6 months, 2012-01-01 to 2012-07-01 | $15.50bn | us-gaap:Revenues |
| Cost of revenue | 3 months, 2012-04-02 to 2012-07-01 | $6.43bn | us-gaap:CostOfRevenue |
| Cost of revenue | 6 months, 2012-01-01 to 2012-07-01 | $12.61bn | us-gaap:CostOfRevenue |
| Operating income | 3 months, 2012-04-02 to 2012-07-01 | $970.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2012-01-01 to 2012-07-01 | $1.83bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2012-04-02 to 2012-07-01 | $42.0m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2012-01-01 to 2012-07-01 | $84.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2012-04-02 to 2012-07-01 | $294.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2012-01-01 to 2012-07-01 | $551.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2012-04-02 to 2012-07-01 | $634.0m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2012-01-01 to 2012-07-01 | $1.20bn | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2012-04-02 to 2012-07-01 | $1.77 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2012-01-01 to 2012-07-01 | $3.34 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2012-04-02 to 2012-07-01 | $1.79 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2012-01-01 to 2012-07-01 | $3.37 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2012-04-02 to 2012-07-01 | 357,373,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2012-01-01 to 2012-07-01 | 358,366,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2012-01-01 to 2012-07-01 | $1.20bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months, 2012-01-01 to 2012-07-01 | $176.0m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2012-04-02 to 2012-07-01 | $184.0m | us-gaap:PaymentsOfDividends |
| Dividends paid | 6 months, 2012-01-01 to 2012-07-01 | $353.0m | us-gaap:PaymentsOfDividends |
| Share repurchases | 6 months, 2012-01-01 to 2012-07-01 | $592.0m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2012-07-01 | $2.54bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2012-07-01 | $15.53bn | us-gaap:AssetsCurrent |
| Total assets | at 2012-07-01 | $35.20bn | us-gaap:Assets |
| Current liabilities | at 2012-07-01 | $12.18bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2012-07-01 | $2.90bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2012-07-01 | $1.03bn | us-gaap:DebtCurrent |
| Shareholders' equity | at 2012-07-01 | $13.66bn | us-gaap:StockholdersEquity |
| Shares outstanding | at 2012-07-01 | 352,778,253 shares | dei:EntityCommonStockSharesOutstanding |

## Management's discussion and analysis

As filed, 45,066 characters.

### BUSINESS OVERVIEW

General Dynamics offers a broad portfolio of products and services in business aviation; combat vehicles, weapons systems and munitions; military and commercial shipbuilding; and communications and information technology. We operate through four business groups: Aerospace, Combat Systems, Marine Systems and Information Systems and Technology. Our primary customers are the U.S. government, including the Department of Defense, Department of Homeland Security, the intelligence community and other civilian agencies; international governments around the world; and a diverse base of corporate and individual buyers of business jets. We operate in two primary markets, defense and business aviation, with the majority of our revenues from contracts with the U.S. government. The following discussion should be read in conjunction with our 2011 Annual Report on Form 10-K and with the unaudited Consolidated Financial Statements included in this Form 10-Q.

### DEFENSE BUSINESS ENVIRONMENT

As a defense contractor, our financial performance is impacted by the allocation and prioritization of U.S. defense spending. The Budget Control Act of 2011 has two primary parts that affect future defense spending. The first part mandates a $487 billion reduction to previously-planned defense spending over the next decade. These cuts are incorporated in the fiscal year (FY) 2013 proposed defense budget. The second part is a sequester mechanism that would impose an additional $500 billion of cuts on defense spending between FY 2013 and FY 2021 if the Congress does not identify a means to reduce the U.S. deficit by $1.2 trillion. By law, these cuts take effect at the beginning of calendar year 2013. As of August 1, 2012, the Congress has not identified the required savings. Given the uncertainty regarding how the Congress will reduce the U.S. deficit and a lack of specifics on how cuts will be implemented, we are unable to predict the impact on our programs or financial outlook, including our revenues, operating earnings and margins, cash flow, orders and backlog and long-lived assets. However, funding reductions of the magnitude imposed by the sequester mechanism as written would have material operational consequences to our employee base, facilities and suppliers.

### RESULTS OF OPERATIONS

### INTRODUCTION

We recognize the majority of our revenues using the percentage-of-completion method of accounting. The following paragraphs explain how this method is applied in recognizing revenues and operating costs in our Aerospace and defense business groups. An understanding of our practices is important to an evaluation of our operating results.

In the Aerospace group, contracts for new aircraft have two major phases: the manufacture of the “green” aircraft and the aircraft’s outfitting, which includes exterior painting and installation of customer-selected interiors. We record revenues on these contracts at the completion of these two phases: when green aircraft are delivered to and accepted by the customer, and when the customer accepts final delivery of the outfitted aircraft. Revenues in the Aerospace group’s other original equipment manufacturers (OEMs) completions and services businesses are recognized as work progresses or upon delivery of services. Changes in revenues result from the number and mix of new aircraft deliveries (green and outfitted), progress on aircraft completions and the level of aircraft service activity during the period.

The majority of the Aerospace group’s operating costs relates to new aircraft production for firm orders and consists of labor, material and overhead costs. The costs are accumulated in production lots and recognized as operating costs at green aircraft delivery based on the estimated average unit cost in a production lot. Thus, the level of operating costs reported in a given period is based largely on the number and type of aircraft delivered. To a lesser extent, the level of operating costs is impacted by changes in the estimated average unit cost for a production lot. Operating costs in the Aerospace group’s other OEMs completions and services businesses are generally recognized as incurred.

For new aircraft, operating earnings and margins are a function of the prices of our aircraft, our operational efficiency in manufacturing and outfitting the aircraft and the mix of aircraft deliveries between the higher-margin large-cabin and lower-margin mid-cabin aircraft. Additional factors affecting the group’s earnings and margins include the volume, mix and profitability of completions and services work performed, the market for pre-owned aircraft and the level of general and administrative (G&A) and research and development (R&D) costs incurred by the group.

In the defense groups, revenue on long-term government contracts is recognized as work progresses, either as products are produced or services are rendered. As a result, changes in revenues are discussed generally in terms of volume, typically measured by the level of activity on individual contracts. Year-over-year variances attributed to volume indicate increases or decreases in revenues due to changes in production or service levels and delivery schedules.

Operating costs for the defense groups consist of labor, material, subcontractor and overhead costs and are generally recognized as incurred. Variances in costs recognized from period to period primarily reflect increases and decreases in production or activity levels on individual contracts and, therefore, result largely from the same factors that drive variances in revenues.

Operating earnings and margins in the defense groups are driven by changes in volume, performance or contract mix. Performance refers to changes in profitability based on revisions to estimates at completion on individual contracts. These revisions result from increases or decreases to the estimated value of the contract or the estimated costs to complete. Therefore, changes in costs incurred in the period do not necessarily impact profitability. It is only when total estimated costs at completion change that profitability may be impacted. Contract mix refers to changes in the volume of higher- vs. lower-margin work on individual contracts and when aggregated across the contract portfolio. On an individual contract, higher or lower margins can be inherent in the contract type (e.g., fixed-price/cost-reimbursable) or type of work (e.g., development/production).

### CONSOLIDATED OVERVIEW

| Three Months Ended | July 3, 2011 | July 1, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $ 7,879 | $ 7,922 | $ 43 0.5 % |
| Operating costs and expenses | 6,930 | 6,952 | 22 0.3 % |
| Operating earnings | 949 | 970 | 21 2.2 % |
| Operating margins | 12.0% | 12.2% |  |
| Six Months Ended | July 3, 2011 | **July 1, 2012** | Variance |
| Revenues | $ 15,677 | $ 15,501 | $ (176) (1.1)% |
| Operating costs and expenses | 13,799 | 13,671 | (128) (0.9)% |
| Operating earnings | 1,878 | 1,830 | (48) (2.6)% |
| Operating margins | 12.0% | 11.8% |  |

Our revenues and operating costs were up slightly in the second quarter of 2012 compared with the prior-year period. These increases were driven primarily by the Aerospace group’s green deliveries of G650 aircraft, which commenced in the fourth quarter of 2011, but were largely offset by lower volume in the Information Systems and Technology group’s tactical communications systems business. Operating earnings and margins in the second quarter of 2012 were up due to the increased volume in the higher-margin Aerospace group, as well as favorable performance on major production programs in the Combat Systems and Marine Systems groups.

In the first half of 2012, revenues and operating costs were down as tactical communications systems volume decreases in the Information Systems and Technology group exceeded the impact of G650 aircraft revenues in the Aerospace group. Operating earnings and margins in the first half of 2012 were down due to lower volume in the Information Systems and Technology group and the shift in revenues from higher margin tactical communications products to lower margin information technology services.

### PRODUCT REVENUES AND OPERATING COSTS

| Three Months Ended | July 3, 2011 | July 1, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $ 5,055 | $ 4,987 | $ (68) (1.3)% |
| Operating costs | 4,005 | 3,936 | (69) (1.7)% |
| Six Months Ended | July 3, 2011 | **July 1, 2012** | Variance |
| Revenues | $ 10,116 | $ 9,705 | $ (411) (4.1)% |
| Operating costs | 8,014 | 7,700 | (314) (3.9)% |

30

Product revenues were lower in the second quarter and the first six months of 2012 compared with the prior-year periods. The decrease in product revenues consisted of the following:

|  | Second Quarter | Six Months |
| --- | ---: | ---: |
| Tactical communications products | $(310) | $(656) |
| Aircraft manufacturing, outfitting and completions | 249 | 494 |
| Ship construction | 47 | (73) |
| Pre-owned aircraft | (44) | (44) |
| Other, net | (10) | (132) |
| Total decrease | $(68) | $(411) |

In 2012, tactical communication products revenues decreased due to protracted customer acquisition cycles and a slower than expected transition to follow-on work on several programs. Offsetting this decrease were higher aircraft manufacturing, outfitting and completions revenues due to green deliveries of G650 aircraft, which began in the fourth quarter of 2011. While ship construction revenues increased in the second quarter due to higher DDG-1000 and DDG-51 destroyer volume, revenues were down in the first half of 2012 as the T-AKE combat-logistics ship program nears completion. The Aerospace group sold no pre-owned aircraft in 2012.

Product operating costs were lower in the second quarter and first half of 2012 compared with the prior-year periods. The decrease in product operating costs consisted of the following:

|  | Second Quarter | Six Months |
| --- | ---: | ---: |
| Tactical communication products volume | $(221) | $(502) |
| Aircraft manufacturing, outfitting and completions volume | 187 | 378 |
| Ship construction volume | 26 | (112) |
| Pre-owned aircraft volume | (43) | (43) |
| Other changes, net | (18) | (35) |
| Total decrease | $(69) | $(314) |

As the table above demonstrates, the primary driver of the changes in product operating costs in the second quarter and first six months of 2012 was volume. No other changes were material.

### SERVICE REVENUES AND OPERATING COSTS

| Three Months Ended | July 3, 2011 | July 1, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $2,824 | $2,935 | $111 3.9% |
| Operating costs | 2,420 | 2,491 | 71 2.9% |
| Six Months Ended | July 3, 2011 | **July 1, 2012** | Variance |
| Revenues | $5,561 | $5,796 | $235 4.2% |
| Operating costs | 4,771 | 4,911 | 140 2.9% |

31

Service revenues increased in the second quarter and first half of 2012 compared with the prior-year periods. The increase in service revenues consisted of the following:

|  | Second Quarter | Six Months |
| --- | ---: | ---: |
| Ship engineering and repair | $43 | $121 |
| Tactical communications support | 54 | 71 |
| Other, net | 14 | 43 |
| Total increase | $111 | $235 |

In 2012, the increase in ship engineering and repair revenues was driven by the fourth quarter 2011 acquisition of Metro Machine Corp. and higher volume on engineering work on the U.S. Navy’s next-generation ballistic-missile submarine (SSBN(X)) program. Tactical communications support revenues increased in 2012 primarily due to higher service volume on the U.K.-based Bowman communications system program, which has transitioned to maintenance and long-term support.

Service operating costs increased in the second quarter and first six months of 2012 compared with the prior-year periods. The increase in service operating costs consisted of the following:

|  | Second Quarter | Six Months |
| --- | ---: | ---: |
| Ship engineering and repair volume | $ 36 | $ 102 |
| Tactical communications support volume | 36 | 59 |
| Other changes, net | (1) | (21) |
| Total increase | $ 71 | $ 140 |

As shown above, the primary driver of the changes in service operating costs in the second quarter and first six months of 2012 was volume. No other changes were material.

### OTHER INFORMATION

### G&A Expenses

As a percentage of revenues, G&A expenses were 6.8 percent in the first half of 2012, up from 6.5 percent in the prior-year period.

### Interest Expense

Net interest expense in the first six months of 2012 was $76 compared with $65 in the same period in 2011. The increase in interest expense is largely due to the $750 million net increase in fixed-rate notes in July 2011. We expect full-year 2012 net interest expense to be approximately $155.

### Other, Net

In 2011, other income included a gain from the sale of the detection systems portion of the weapons systems business in our Combat Systems group in the second quarter. The sale resulted in a pretax gain of $38.

### Effective Tax Rate

Our effective tax rate for the first six months of 2012 was 31.5 percent compared with 30.8 percent in the same period in 2011. We anticipate a full-year 2012 effective tax rate of approximately 32 percent, compared with 31.4 percent in 2011, an increase primarily due to the expiration of the R&D tax credit that Congress has not yet extended for 2012 and less income from international operations in jurisdictions with lower tax rates. For additional discussion of tax matters, see Note I to the unaudited Consolidated Financial Statements.

### REVIEW OF BUSINESS GROUPS

Following is a discussion of operating results and outlook for each of our business groups. For the Aerospace group, results are analyzed with respect to specific lines of products and services, consistent with how the group is managed. For the defense groups, the discussion is based on the types of products and services each group offers with a supplemental discussion of specific contracts and programs when significant to the groups’ results. Information regarding our business groups also can be found in Note M to the unaudited Consolidated Financial Statements.

### AEROSPACE

| Three Months Ended | July 3, 2011 | July 1, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $ 1,376 | $ 1,592 | $ 216 15.7% |
| Operating earnings | 209 | 257 | 48 23.0% |
| Operating margin | 15.2% | 16.1% |  |
| Gulfstream aircraft deliveries (in units): |  |  |  |
| Green | 23 | 26 | 3 13.0% |
| Outfitted | 22 | 21 | (1) (4.5)% |
| Six Months Ended | July 3, 2011 | **July 1, 2012** | Variance |
| Revenues | $ 2,729 | $ 3,215 | $ 486 17.8% |
| Operating earnings | 439 | 528 | 89 20.3% |
| Operating margin | 16.1% | 16.4% |  |
| Gulfstream aircraft deliveries (in units): |  |  |  |
| Green | 47 | 54 | 7 14.9% |
| Outfitted | 46 | 40 | (6) (13.0)% |

### Operating Results

The Aerospace group’s revenues increased in the second quarter and first six months of 2012 compared with the prior-year periods. The increase consisted of the following:

|  | Second Quarter | Six Months |
| --- | ---: | ---: |
| Aircraft manufacturing, outfitting and completions | $ 249 | $ 494 |
| Aircraft services | 11 | 36 |
| Pre-owned aircraft | (44) | (44) |
| Total increase | $ 216 | $ 486 |

33

Aircraft manufacturing, outfitting and completions revenues include Gulfstream business-jet aircraft as well as completions of aircraft produced by other OEMs. Aircraft manufacturing, outfitting and completions revenues increased in 2012 primarily due to green deliveries of the new G650 aircraft, which began in the fourth quarter of 2011.

The growing global installed base of business-jet aircraft and increased demand for maintenance and repair work resulted in growth in aircraft services revenues in the second quarter and first six months of 2012 compared with the prior-year periods.

Pre-owned aircraft sales decreased in the second quarter and first six months of 2012. The Aerospace group sold no pre-owned aircraft in 2012 compared with two aircraft in the second quarter of 2011.

The group’s operating earnings increased in the second quarter and first six months of 2012 compared with 2011. The increase consisted of the following:

|  | Second Quarter | Six Months |
| --- | ---: | ---: |
| Aircraft manufacturing, outfitting and completions | $ 40 | $ 108 |
| Aircraft services | (6) | - |
| Pre-owned aircraft | (1) | (1) |
| G&A/other expenses | 15 | (18) |
| Total increase | $ 48 | $ 89 |

Aircraft manufacturing, outfitting and completions earnings increased in the second quarter and first half of 2012 compared with the prior-year periods primarily due to the additional G650 green deliveries discussed above. Earnings from Jet Aviation’s completions business also increased in 2012 as operational performance improved on narrow- and wide-body completion contracts.

Despite the increase in revenues, aircraft services earnings were down slightly in the second quarter and steady in the first six months of 2012 due to an unfavorable mix of service work and competitive market pricing.

In the first six months of 2012, G&A and other expenses were negatively impacted by higher R&D expenses. However, in the second quarter, these expenses were lower due to the timing of supplier reimbursements of R&D costs.

The group’s operating margins increased 90 and 30 basis points in the second quarter and first six months of 2012, respectively, compared with the prior year periods. The increases were driven by growth in the group’s higher-margin aircraft manufacturing business and improved operational performance in Jet Aviation’s completions business.

### Outlook

We expect an increase of approximately 15 percent in the group’s revenues in 2012 compared with 2011. The expected increase is due to additional green deliveries and initial outfitted deliveries of the G650. We expect the Aerospace group’s margins to be in the mid-15 percent range, up from 2011 due to the continued strong performance at Gulfstream and improved performance in Jet Aviation’s completions business.

### COMBAT SYSTEMS

| Three Months Ended | July 3, 2011 | July 1, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $ 2,121 | $ 2,149 | $ 28 1.3 % |
| Operating earnings | 299 | 322 | 23 7.7 % |
| Operating margins | 14.1% | 15.0% |  |
| Six Months Ended | July 3, 2011 | **July 1, 2012** | Variance |
| Revenues | $ 4,076 | $ 4,060 | $ (16) (0.4)% |
| Operating earnings | 576 | 525 | (51) (8.9)% |
| Operating margins | 14.1% | 12.9% |  |

### Operating Results

The Combat Systems group’s revenues were up in the second quarter and down slightly in the first half of 2012 compared with the prior-year periods. The change consisted of the following:

|  | Second Quarter | Six Months |
| --- | ---: | ---: |
| U.S. military vehicles | $154 | $215 |
| Weapon systems and munitions | (60) | (91) |
| European military vehicles | (66) | (140) |
| Total increase (decrease) | $28 | $(16) |

In the second quarter and first half of 2012, revenues were up in the group’s U.S. military vehicles business, primarily due to the December 2011 acquisition of Force Protection, Inc., increased export volume on the international Abrams main battle tank and light armored vehicle (LAV) programs and the start of the technology development phase of the Army’s Ground Combat Vehicle (GCV) program. These revenues were partially offset by lower volume on the domestic Stryker wheeled combat vehicle and Abrams tank programs consistent with our expectations.

Revenues were down in 2012 in the weapons systems and munitions business due to the sale of the detection systems business in the second quarter of 2011 and lower volume across several armament and munitions programs.

In the group’s European military vehicle business, revenues were down in 2012 due to lower volume on several wheeled vehicle contracts for various international customers, including final deliveries under the Piranha vehicle contract with the Belgium Army.

The Combat Systems group’s operating margins increased 90 basis points in the second quarter of 2012 due to higher profitability on the U.S. Stryker and Abrams programs. In the first half of 2012, margins were down 120 basis points compared with 2011 due to the negative impact of $67 of prior period adjustments recorded in the first quarter of 2012 at one of our subsidiaries in the European military vehicles business.

### Outlook

We expect the Combat Systems group’s revenues to approximate $8.5 billion in 2012. Lower volume in our domestic U.S. and European military vehicles businesses is expected to be mitigated by growth in international vehicle exports and revenues from the acquisition of Force Protection, Inc. Given the group’s operating results in the first half of the year, we expect the group’s full-year operating margin to approximate the mid-13 percent range.

### MARINE SYSTEMS

| Three Months Ended | July 3, 2011 | July 1, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $ 1,576 | $ 1,653 | $ 77 4.9% |
| Operating earnings | 161 | 183 | 22 13.7% |
| Operating margins | 10.2% | 11.1% |  |
| Six Months Ended | July 3, 2011 | **July 1, 2012** | Variance |
| Revenues | $ 3,252 | $ 3,258 | $ 6 0.2% |
| Operating earnings | 328 | 368 | 40 12.2% |
| Operating margins | 10.1% | 11.3% |  |

### Operating Results

Higher Marine Systems group revenues in the second quarter of 2012 drove a slight increase in the first half of 2012 revenues over the comparable 2011 periods. The increase consisted of the following:

|  | Second Quarter | Six Months |
| --- | ---: | ---: |
| Navy ship construction | $47 | $(73) |
| Navy ship engineering, repair and other services | 30 | 79 |
| Total increase | $77 | $6 |

The group’s U.S. Navy ship-construction programs include Virginia-class submarines, DDG-1000 and DDG-51 destroyers, and T-AKE combat-logistics and Mobile Landing Platform (MLP) auxiliary support ships. While Virginia-class submarine volume was steady in the second quarter, revenues were down in the first half of 2012 compared with the prior-year period due to timing as the group transitions from the Block II to the Block III contract. The ninth Virginia-class submarine, Mississippi, was delivered in the second quarter of 2012 one year ahead of schedule and more than $60 below target cost. Deliveries of the remaining nine Virginia-class submarines under contract are scheduled through 2018, and plans published by the Navy include a request for proposals in 2012 for the next nine submarines under the program.

Increased volume on the DDG-1000 and DDG-51 destroyer programs in the second quarter of 2012 drove higher revenues in the first half of 2012. Deliveries of the three DDG-1000 ships under contract are scheduled for 2014, 2015 and 2018. The final destroyer under the legacy DDG-51 multi-ship contract was delivered in the second quarter of 2012. The two destroyers awarded under the Navy’s restart of the DDG-51 program, including one awarded in the first quarter of 2012, are scheduled for delivery in 2016 and 2017, respectively. We have submitted a bid for a multi-ship, multi-year contract expected to be awarded in early 2013 for nine DDG-51 ships with an option for a tenth ship.

Volume increased on the MLP program in 2012 as the group continued construction on the first ship and began construction of the second ship. The group was awarded a construction contract for the third MLP ship in the first quarter. Delivery of one ship per year is scheduled beginning in 2013. Additionally, a fourth MLP ship was included in the FY 2013 budget request. On the group’s T-AKE program, activity was down in 2012 as the program nears completion. The 13th ship, USNS Medgar Evers, was delivered in the second quarter of 2012 and delivery of the final ship is scheduled for the fourth quarter.

Revenues were up on engineering and repair programs for the Navy in 2012. The increase in revenues was driven by the 2011 acquisition of Metro Machine Corp., a surface-ship repair operation located in Norfolk, Virginia, and higher volume on engineering work on the SSBN(X) program.

Growth in operating earnings outpaced revenues, resulting in a 90- and 120-basis point increase in operating margin in the second quarter and the first half of 2012, respectively, compared with the prior-year periods. This margin increase was primarily due to an increase in the T-AKE profit rate as the mature program continued to experience favorable cost performance.

### Outlook

We expect the Marine Systems group’s 2012 revenues to decrease slightly from 2011 as construction on new ship-construction programs mitigates the decline in revenues from the T-AKE program that will be completed this year. Given strong performance in the first half of the year, operating margins are expected to be in the low-11 percent range.

### INFORMATION SYSTEMS AND TECHNOLOGY

| Three Months Ended | July 3, 2011 | July 1, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $ 2,806 | $ 2,528 | $ (278) (9.9)% |
| Operating earnings | 299 | 226 | (73) (24.4)% |
| Operating margins | 10.7% | 8.9% |  |
| Six Months Ended | July 3, 2011 | July 1, 2012 | Variance |
| Revenues | $ 5,620 | $ 4,968 | $ (652) (11.6)% |
| Operating earnings | 575 | 444 | (131) (22.8)% |
| Operating margins | 10.2% | 8.9% |  |

### Operating Results

The Information Systems and Technology group’s revenues decreased in the second quarter and first half of 2012 compared with the prior-year periods. The decrease consisted of the following:

|  | Second Quarter | Six Months |
| --- | ---: | ---: |
| Tactical communication systems | $(256) | $(585) |
| Information technology (IT) services | 3 | 2 |
| Intelligence, surveillance and reconnaissance (ISR) systems | (25) | (69) |
| Total decrease | $(278) | $(652) |

37

The decrease in revenues in the tactical communication systems business was driven by protracted U.S. customer acquisition cycles and a slower than expected transition to follow-on work on several contracts. This resulted in lower revenues in 2012 on key programs, including Common Hardware Systems (CHS) and the Warfighter Information Network – Tactical (WIN-T), and for encryption hardware products. In addition, over 10 percent of the decline in the group’s revenues in both periods was due to lower volume on the U.K.-based Bowman communications system program, which has been successfully fielded and has now moved into maintenance and long-term support.

In the group’s IT services business, revenues were steady in the second quarter and first six months of 2012 compared with the prior-year periods as decreased volume on several completed large-scale IT infrastructure and support programs for the intelligence community and the Department of Defense, including the New Campus East program, was offset by revenues from the 2011 acquisition of Vangent, Inc.

Revenues were down in 2012 compared with the prior-year periods in the group’s ISR business due to lower volume of optical products and on several mission integration programs. Demand for optical products continues to be negatively impacted by pressured defense budgets and the economic downtown.

The decrease in the group’s 2012 operating earnings resulted in a 180-basis-point decrease in operating margins in the second quarter and a 130-basis-point decrease in the first half of 2012 compared with the prior-year periods. This decrease was driven by a shift in the mix of the group’s revenues to lower-margin IT services, which increased from 40 to 45 percent of the group’s total revenues in both periods.

### Outlook

We expect 2012 revenues in the Information Systems and Technology group to be down approximately 7 percent from 2011 due to continued award delays in our tactical communication systems business. Given the mix shift to lower-margin IT services business discussed above, the group’s operating margins are expected to be in the low-9 percent range in 2012.

### CORPORATE

Corporate results consist primarily of compensation expense for stock options. Corporate operating costs totaled $18 in the second quarter of 2012 compared with $19 in the second quarter of 2011 and $35 in the first half of 2012 compared with $40 in the 2011 period. We expect 2012 full-year Corporate operating costs of approximately $70.

### BACKLOG

Our total backlog, including funded and unfunded portions, was $52.4 billion on July 1, 2012, compared with $55.2 billion at the end of the first quarter of 2012. Our backlog does not include work expected to be awarded under unfunded indefinite delivery, indefinite quantity (IDIQ) contracts or unexercised options associated with existing firm contracts, which we refer to collectively as estimated potential contract value. The estimated potential contract value represents our estimate of the ultimate value we expect to receive under these arrangements. At the end of the second quarter of 2012, our estimate of this potential contract value was $26.2 billion, down 3 percent from the end of the first quarter.

The following table details the backlog and the total estimated contract value of each business group at the end of the first and second quarters of 2012:

|  | Funded April 1, 2012 | Unfunded | Total Backlog | Estimated Potential Contract Value | Total Estimated Contract Value |
| --- | ---: | ---: | ---: | ---: | ---: |
| Aerospace | $16,718 | $266 | $16,984 | $- | $16,984 |
| Combat Systems | 9,623 | 1,042 | 10,665 | 3,473 | 14,138 |
| Marine Systems | 12,261 | 5,754 | 18,015 | 1,199 | 19,214 |
| Information Systems and Technology | 7,649 | 1,913 | 9,562 | 22,256 | 31,818 |
| Total | $46,251 | $8,975 | $55,226 | $26,928 | $82,154 |
|  | **July 1, 2012** |  |  |  |  |
| Aerospace | $16,058 | $241 | $16,299 | $- | $16,299 |
| Combat Systems | 8,854 | 905 | 9,759 | 3,090 | 12,849 |
| Marine Systems | 11,666 | 5,339 | 17,005 | 1,377 | 18,382 |
| Information Systems and Technology | 7,348 | 1,951 | 9,299 | 21,774 | 31,073 |
| Total | $43,926 | $8,436 | $52,362 | $26,241 | $78,603 |

### AEROSPACE

Aerospace funded backlog represents aircraft orders for which we have definitive purchase contracts and deposits from customers. Funded backlog includes the group’s newest aircraft models, the G280 and the G650, which have received provisional type certification from the Federal Aviation Administration (FAA). The G280 has completed its FAA flight testing and the Aerospace group is working through the final stages of certification, expected before the end of 2012. Flight testing on the G650 is nearly complete. We remain on track for full type certification in the third quarter of 2012 although the exact date of type certification will be determined primarily by the FAA schedule. Aerospace unfunded backlog consists of agreements to provide future aircraft maintenance and support services.

The group ended the second quarter of 2012 with $16.3 billion of backlog, down from $17 billion at the end of the first quarter as we deliver on our G650 backlog. An elongated order cycle related, in part, to increased global economic uncertainty resulted in lower than expected order activity in the second quarter. We expect order activity to improve in the second half of the year as we receive orders we anticipated in the first half of 2012, including several multi-aircraft orders. However, customer defaults in the quarter were at the lowest level in nearly four years. In the group’s large-cabin segment, backlog remains well-positioned with an 18- to 24-month period between customer order and delivery of in-service aircraft and approximately five years of backlog for the G650.

Approximately 60 percent of the group’s orders in the first half of 2012 were from North American customers, with strong demand from Fortune 500 companies. While the installed base of aircraft is predominantly in North America, international customers represented nearly 60 percent of the group’s backlog at the end of the second quarter.

### DEFENSE GROUPS

The total backlog for our defense groups represents the estimated remaining sales value of work to be performed under firm contracts. The funded portion of this backlog includes items that have been authorized and appropriated by the Congress and funded by the customer, as well as commitments by international customers that are similarly approved and funded by their governments. While there is no guarantee that future budgets and appropriations will provide funding for a given program, we have included only firm contracts at the amounts we believe are likely to receive funding.

Total backlog in our defense groups was $36.1 billion on July 1, 2012, down 6 percent from the first quarter. Backlog decreased in each of our defense groups, most significantly in the Marine Systems group, which typically has significant variations in quarterly order intake and received significant DDG-51 and MLP orders in the first quarter, and the Combat Systems group, which expects several significant contract awards in the second half of 2012, including Abrams modernization and international tank export programs.

Our defense groups each received notable contract awards in the quarter.

Combat Systems awards included the following:

- $270 from the U.S. Army for the production of Hydra-70 rockets.
- $170 from the Army to upgrade Abrams tanks to the M1A2 System Enhancement Package (SEP) configuration and for continued technical support on the program.
- $115 from the Army for the double-V-hull conversion of 49 previously-delivered Stryker vehicles and contractor logistics support.

Marine Systems awards included the following:

- $125 from the U.S. Navy for Advanced Nuclear Plant Studies (ANPS) in support of development of the SSBN(X).
- $80 from the Navy for long-lead funding for the construction of the first Virginia-class submarine under Block IV of the program.
- $65 from the Navy for planning yard services for the DDG-51 guided missile destroyer and FFG-7 Oliver Hazard Perry-class frigate programs.

Information Systems and Technology awards included the following:

- $80 for support of the Trident missile D5 life-extension program, which extends the life of existing missiles by replacing and upgrading obsolete components.
- $80 for the Army’s Warfighter Field Operations Customer Support (FOCUS) program to provide support for live, virtual and constructive training operations.
- $65 from the Army for production of Prophet Enhanced tactical signals intelligence systems.
- $55 for the Battlefield Information Collection and Exploitation System (BICES) project to provide coordinated intelligence gathering among NATO and other allies.
- $30 from the Army under the Range Radar Replacement Program (RRRP) to develop modernized instrumentation radars at U.S Army test ranges.
- An award from the Centers for Medicare & Medicaid Services (CMS) to combine the Coordination of Benefits and the Medicare Secondary Payer systems. The program has a maximum potential value of $100 over 5 years.
- An IDIQ contract from the Federal Aviation Administration to deliver radios that allow air traffic control personnel to communicate with aircraft. The program has a maximum potential value of $365 over 10 years.

### FINANCIAL CONDITION, LIQUIDITY AND CAPITAL RESOURCES

We ended the second quarter of 2012 with a cash balance of $2.5 billion, down $109 from the end of 2011. Our net debt, defined as debt less cash and equivalents and marketable securities, was $1 billion at the end of the second quarter of 2012, unchanged from the end of 2011. Following is a discussion of the major components of our operating, investing and financing activities, as classified on the Consolidated Statement of Cash Flows, in the first half of 2011 and 2012.

### OPERATING ACTIVITIES

We generated cash from operating activities of $1.2 billion in the first half of 2012 compared with $1.1 billion in the same period in 2011. The primary driver of cash flows in both periods was net earnings. Cash from operating activities in the first half of 2012 also includes approximately $100 of contributions to our pension plans.

As discussed further in Note K to the unaudited Consolidated Financial Statements, litigation on the A-12 program termination has been ongoing since 1991. If, contrary to our expectations, the default termination ultimately is sustained and the government prevails on its recovery theories, we, along with The Boeing Company, could collectively be required to repay the U.S. government as much as $1.4 billion for progress payments received for the A-12 contract, plus interest, which was approximately $1.6 billion on July 1, 2012. If this were the outcome, we would owe half of the total, or approximately $1.5 billion pretax. Our after-tax cash obligation would be approximately $740. We believe we have sufficient resources, including access to capital markets, to pay such an obligation, if required.

### INVESTING ACTIVITIES

We used $506 for investing activities in the first six months of 2012 compared with $251 in the same period in 2011. The primary uses of cash for investing activities were acquisitions, capital expenditures and purchases of marketable securities.

We completed two acquisitions for $165 in the first half of 2012. We did not complete any acquisitions in the first six months of 2011. We used cash on hand to fund these acquisitions. See Note B to the unaudited Consolidated Financial Statements for further discussion of acquisition activity. We also announced the acquisition of the Ship Repair and Coatings Division of Earl Industries, an

East Coast ship repair company that supports the U.S. Navy fleet in Norfolk, Virginia, and Mayport, Florida. The acquisition closed in the third quarter of 2012.

We expect full-year capital expenditures to be approximately 2 percent of revenues, up slightly from 2011 largely due to Gulfstream’s $500 seven-year Savannah, Georgia, facilities expansion project started in 2010.

As a result of lower market interest rates that have decreased the return on our cash balances, we have continued our investment in available-for-sale and held-to-maturity securities to take advantage of additional return generated by these investments. We had net purchases of $165 in the first half of 2012 compared with $190 in the first six months of 2011.

In 2011, investing activities also included proceeds from the second quarter sale of the detections systems portion of the weapons systems business in our Combat Systems group.

### FINANCING ACTIVITIES

Net cash used for financing activities was $806 in the six-month period ended July 1, 2012, compared with $1.3 billion in the same period in 2011. Our financing activities include payment of dividends and repurchases of common stock. Net cash from financing activities also includes proceeds received from stock options exercises.

We had no commercial paper outstanding on July 1, 2012. We have $2 billion in bank credit facilities that remain available. These facilities provide backup liquidity to our commercial paper program. We also have an effective shelf registration on file with the Securities and Exchange Commission. The next material repayment of long-term debt is $1 billion of fixed-rate notes scheduled to mature in May 2013. As we approach the maturity date, we will determine whether to repay these notes with cash on hand or refinance the obligation. See Note G to the unaudited Consolidated Financial Statements for additional information regarding our debt obligations, including scheduled debt maturities.

On March 7, 2012, our board of directors declared an increased quarterly dividend of $0.51 per share – the 15th consecutive annual increase. The board had increased the quarterly dividend to $0.47 per share in March 2011.

In the first six months of 2012, we repurchased 9.1 million of our outstanding shares on the open market at an average price of $66 per share. In the first half of 2011, we repurchased 14.2 million shares at an average price of $73 per share. On July 1, 2012, approximately 10.9 million shares remain authorized by our board of directors for repurchase – about 3 percent of our total shares outstanding.

### NON-GAAP MANAGEMENT METRICS – FREE CASH FLOW

Our free cash flow from operations for the first six months of 2012 was $1 billion, or 86 percent of earnings from continuing operations, compared with $927 and 72 percent for the same period in 2011. We define free cash flow from operations as net cash provided by operating activities less capital expenditures. We believe free cash flow from operations is a useful measure for investors because it portrays our ability to generate cash from our core businesses for purposes such as repaying maturing debt, funding business acquisitions, repurchasing our common stock and paying dividends. We use free cash flow from operations to assess the quality of our earnings and as a performance measure in evaluating management of the business.

The following table reconciles the free cash flow from operations with net cash provided by operating activities, as classified on the unaudited Consolidated Statements of Cash Flows:

| Six Months Ended | July 3, 2011 | July 1, 2012 |
| --- | ---: | ---: |
| Net cash provided by operating activities | $1,079 | $1,203 |
| Capital expenditures | (152) | (176) |
| Free cash flow from operations | $927 | $1,027 |
| Cash flows as a percentage of earnings from continuing operations: |  |  |
| Net cash provided by operating activities | 84% | 100% |
| Free cash flow from operations | 72% | 86% |

We expect to continue to generate funds in excess of our short- and long-term liquidity needs. We believe we have adequate funds on hand and sufficient borrowing capacity to execute our financial and operating strategy.

### ADDITIONAL FINANCIAL INFORMATION

### ENVIRONMENTAL MATTERS AND OTHER CONTINGENCIES

For a discussion of environmental matters and other contingencies, see Note K to the unaudited Consolidated Financial Statements. We do not expect our aggregate liability with respect to these matters to have a material impact on our results of operations, financial condition or cash flows.

### APPLICATION OF CRITICAL ACCOUNTING POLICIES

Management’s Discussion and Analysis of Financial Condition and Results of Operations is based on our unaudited Consolidated Financial Statements, which have been prepared in accordance with U.S. generally accepted accounting principles (GAAP). The preparation of financial statements in accordance with GAAP requires that we make estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the date of the financial statements, as well as the reported amounts of revenues and expenses during the reporting period.

Accounting for long-term contracts and programs involves the use of various techniques to estimate total contract revenues and costs. Contract estimates are based on various assumptions that project the outcome of future events that often span several years. We review our performance monthly and update our contract estimates at least annually and often quarterly as well as when required by specific events and circumstances. We recognize changes in estimated profit on contracts under the reallocation method. Under this method, the impact of revisions in estimates is recognized prospectively over the remaining contract term. The net increase in our operating earnings (and earnings per share) from the quarterly impact of revisions in contract estimates totaled $99 ($0.19) and $186 ($0.34) for the three- and six-months periods ended July 3, 2011, including the revision in estimate on the Marine Systems’ T-AKE contract discussed in the second quarter of 2011. The net increase in our operating earnings (and earnings per share) totaled $90 ($0.17) and $158 ($0.31) for the three- and six-month periods ended July 1, 2012, respectively. No revisions on any one contract were material to our unaudited Consolidated Financial Statements in the first half of 2012.

Other significant estimates include those related to goodwill and other intangible assets, income taxes, pensions and other post-retirement benefits, workers’ compensation, warranty obligations and contingencies and litigation. We make our best estimates based on historical and current experience and on various assumptions that we believe to be reasonable under the circumstances. The results of these estimates form the basis for making judgments about the carrying values of assets and liabilities that are not readily available from other sources. Actual results may differ from these estimates. We believe that our judgment is applied consistently and produces financial information that fairly depicts the results of operations for all periods presented. For a full discussion of our critical accounting policies, see our Annual Report on Form 10-K for the year ended December 31, 2011.

## Market risk

As filed, 162 characters.

There have been no material changes with respect to this item from the disclosure included in our Annual Report on Form 10-K for the year ended December 31, 2011.

## Controls and procedures

As filed, 3,300 characters.

Our management, under the supervision and with the participation of the Chief Executive Officer and the Chief Financial Officer, evaluated the effectiveness of our disclosure controls and procedures (as defined in Rule 13a-15(e) and Rule 15d-15(e) under the Securities Exchange Act of 1934, as amended) on July 1, 2012. Based on this evaluation, the Chief Executive Officer and Chief Financial Officer concluded that, on July 1, 2012, our disclosure controls and procedures were effective.

There were no changes in our internal control over financial reporting that occurred during the quarter ended July 1, 2012, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

### FORWARD-LOOKING STATEMENTS

This quarterly report on Form 10-Q contains forward-looking statements that are based on management’s expectations, estimates, projections and assumptions. Words such as “expects,” “anticipates,” “plans,” “believes,” “scheduled,” “outlook,” “should,” “estimates” and variations of these words and similar expressions are intended to identify forward-looking statements. These include but are not limited to projections of revenues, earnings, operating margins, segment performance, cash flows, contract awards, aircraft production, deliveries and backlog. Forward-looking statements are made pursuant to the safe harbor provisions of the Private Securities Litigation Reform Act of 1995, as amended. These statements are not guarantees of future performance and involve certain risks and uncertainties that are difficult to predict. Therefore, actual future results and trends may differ materially from what is forecast in forward-looking statements due to a variety of factors, including the risk factors discussed in Item 1A of our Annual Report on Form 10-K. These factors include, without limitation:

- general U.S. and international political and economic conditions;
- decreases in U.S. government defense spending or changing priorities within the defense budget;
- termination or restructuring of government contracts due to unilateral government action;
- differences in anticipated and actual program performance, including the ability to perform under long-term fixed-price contracts within estimated costs, and performance issues with key suppliers and subcontractors;
- expected recovery on contract claims and requests for equitable adjustment;
- changing customer demand or preferences for business aircraft, including the effects of economic conditions on the business-aircraft market;
- potential for changing prices for energy and raw materials; and
- the status or outcome of legal and/or regulatory proceedings.

All forward-looking statements speak only as of the date of this report or, in the case of any document incorporated by reference, the date of that document. All subsequent written and oral forward-looking statements attributable to the company or any person acting on the company’s behalf are qualified by the cautionary statements in this section. We do not undertake any obligation to update or publicly release any revisions to forward-looking statements to reflect events, circumstances or changes in expectations after the date of this report except as expressly required to do so by law.

## Risk factors

As filed, 2,021 characters.

Other than the revision to the following risk factor concerning risks relating to the U.S. government’s defense budget, we do not believe there are any material changes to the risk factors included in our Annual Report on Form 10-K for the year ended December 31, 2011.

**We depend on the U.S. government for a significant portion of our revenues.** More than two-thirds of our revenues are from the U.S. government. U.S. defense spending has been driven by perceived threats to national security. While the country has been under an elevated threat level for the past decade, competing demands for federal funds could pressure all areas of spending. A decrease in U.S. government defense spending or changes in spending allocation could result in one or more of our programs being reduced, delayed or terminated, which would impact our financial performance.

The Budget Control Act of 2011 has two primary parts that affect future defense spending. The first part mandates a $487 billion reduction to previously-planned defense spending over the next decade. These cuts are incorporated in the fiscal year (FY) 2013 proposed defense budget. The second part is a sequester mechanism that would impose an additional $500 billion of cuts on defense spending between FY 2013 and FY 2021 if the Congress does not identify a means to reduce the U.S. deficit by $1.2 trillion. By law, these cuts take effect at the beginning of calendar year 2013. As of August 1, 2012, the Congress has not identified the required savings. Given the uncertainty regarding how the Congress will reduce the U.S. deficit and a lack of specifics on how cuts will be implemented, we are unable to predict the impact on our programs or financial outlook, including our revenues, operating earnings and margins, cash flow, orders and backlog and long-lived assets. However, funding reductions of the magnitude imposed by the sequester mechanism as written would have material operational consequences to our employee base, facilities and suppliers.

Filed Aug 1, 2012.
Source: SEC EDGAR, the filing index for accession 0001193125-12-327606. Last ingested by Listed: Nov 14, 2026, 20:26 ET. No prices; not investment advice.