# Public Service Enterprise Group Inc: Form 10-Q for the period ended Jun 30, 2012

- Company: [Public Service Enterprise Group Inc](/companies/peg.md) (CIK 788784)
- Form: 10-Q
- Filed: 2012-08-02
- Accepted by EDGAR: Aug 2, 2012, 21:05 ET
- Period: 2012-06-30
- Accession: 0001193125-12-332159
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/788784/000119312512332159/d361520d10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/788784/000119312512332159/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2012-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2012-04-01 to 2012-06-30 | $2.10bn | us-gaap:Revenues |
| Revenue | 6 months, 2012-01-01 to 2012-06-30 | $4.97bn | us-gaap:Revenues |
| Operating income | 3 months, 2012-04-01 to 2012-06-30 | $433.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2012-01-01 to 2012-06-30 | $1.22bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2012-04-01 to 2012-06-30 | $103.0m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2012-01-01 to 2012-06-30 | $204.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2012-04-01 to 2012-06-30 | $146.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2012-01-01 to 2012-06-30 | $358.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2012-04-01 to 2012-06-30 | $211.0m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2012-01-01 to 2012-06-30 | $704.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2012-04-01 to 2012-06-30 | $0.42 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2012-01-01 to 2012-06-30 | $1.39 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2012-04-01 to 2012-06-30 | $0.42 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2012-01-01 to 2012-06-30 | $1.39 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2012-04-01 to 2012-06-30 | 506,969,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2012-01-01 to 2012-06-30 | 506,999,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2012-01-01 to 2012-06-30 | $1.38bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months, 2012-01-01 to 2012-06-30 | $1.28bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2012-04-01 to 2012-06-30 | $180.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Dividends paid | 6 months, 2012-01-01 to 2012-06-30 | $359.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2012-06-30 | $765.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2012-06-30 | $3.94bn | us-gaap:AssetsCurrent |
| Total assets | at 2012-06-30 | $30.14bn | us-gaap:Assets |
| Current liabilities | at 2012-06-30 | $2.82bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2012-06-30 | $7.34bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2012-06-30 | $751.0m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2012-06-30 | $16.0m | us-gaap:CommercialPaper |
| Shareholders' equity | at 2012-06-30 | $10.64bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 53,332 characters.

This combined MD&A is separately filed by PSEG, Power and PSE&G. Information contained herein relating to any individual company is filed by such company on its own behalf. Power and PSE&G each make representations only as to itself and make no representations whatsoever as to any other company.

PSEG’s business consists of three reportable segments, which are:

- **Power,** our wholesale energy supply company that integrates its generating asset operations with its wholesale energy, fuel supply, energy trading and marketing and risk management activities primarily in the Northeast and Mid Atlantic United States,
- **PSE&G,** our public utility company which provides transmission and distribution of electric energy and gas in New Jersey; implements demand response and energy efficiency programs and invests in solar generation, and
- **Energy Holdings,** which owns our energy-related leveraged leases and other investments.

Our business discussion in Part I, Item 1. Business of our 2011 Annual Report on 10-K (Form 10-K) provides a review of the regions and markets where we operate and compete, as well as our strategy for conducting our businesses within these markets, focusing on operational excellence, financial strength and making disciplined investments. Our risk factor discussion in Part II Item 1A of Form 10-K provides information about factors that could have a material adverse impact on our businesses. The following supplements that discussion and the discussion included in the Overview of 2011 and Future Outlook provided in Item 7 in our Form 10-K by describing significant events and business developments that have occurred during 2012 and any changes to the key factors that we expect may drive our future performance. The following discussion refers to the Condensed Consolidated Financial Statements (Statements) and the Related Notes to Condensed Consolidated Financial Statements (Notes). This discussion should be read in conjunction with such Statements, Notes, the 2011 Form 10-K and the Quarterly Report on Form 10-Q for the quarter ended March 31, 2012.

### OVERVIEW OF 2012 AND FUTURE OUTLOOK

During the first half of 2012, our results continued to be adversely impacted by lower prices for electricity and natural gas in the markets we serve. Our pricing also continues to be affected by customer migration away from our BGS supply contracts as these volumes are replaced with lower priced spot market sales. While the average BGS rates have been declining based on recent market prices, customers may still see an incentive to switch to third party suppliers. The result of such a switch may affect the price we receive on our sales, shifting from BGS rates that were established in auctions that had taken place over the past three years, to prices offered by third party suppliers which may be more representative of recent market pricing.

Partially offsetting this lower commodity pricing are higher transmission revenues as a result of our 2012 Annual Formula Rate Update with the Federal Energy Regulatory Commission (FERC), which provides for approximately $94 million in increased annual transmission revenues effective January 1, 2012.

Under the most recent auction in May 2012, for the 2015-2016 period, Power cleared approximately 9,000 MW of its generating capacity at an average price of $167 per MW-day.

Our volumes of gas sales were lower in the first half of 2012, but the decline in gas revenues was significantly mitigated by the favorable impact of a $51 million increase due to recovery of deficiency revenues through the Weather Normalization Charge (WNC). PSE&G’s WNC is a rate mechanism that allows us to increase our rates to compensate for lower revenues we receive from customers as a result of warmer-than-normal winters and to decrease our rates to make up for higher revenues we receive as a result of colder-than-normal winters.

For 2012 and beyond, the key issues we expect our business to confront include:

- the continuing potential for sustained lower natural gas and electricity prices, both at market hubs and at locations where we operate,
- uncertainty in the national and regional economic recovery, which impacts customer demand,
- regulatory and political uncertainty, particularly with regard to future energy policy, design of energy and capacity markets, transmission policy and environmental regulation, and
- challenges to competitive markets, including support for subsidized generation in many states, particularly in New Jersey.

Our future success will depend on our ability to respond to these challenges and take advantage of opportunities presented by these and other regulatory and legislative initiatives. In order to do this, we must:

- continue to focus on controlling costs while maintaining our safety, reliability and compliance standards,
- successfully recontract our open supply positions, and
- execute our capital investment program, including investments for growth that yield contemporaneous and attractive risk adjusted returns.

There have also been certain significant regulatory and legislative developments during the year which may affect our operations in the future as new rules and regulations are adopted. For additional information on these issues, see Item 5. Other Information.

- On April 12, 2012, the Maryland Public Utility Commission (PUC) issued an order requiring three of the four Maryland utility companies to enter into contracts with CPV Shore, LLC (CPV) to construct a new 661 MW natural gas-fired, combined cycle station in Maryland with an in-service date of June 2015. CPV cleared the May 2012 Reliability Pricing Model (RPM) auction. These developments in Maryland may stimulate construction of subsidized generation and impact energy and capacity prices in PJM. Power has joined other generators in challenging the constitutionality of this order in federal court. In addition, the Maryland electric distribution companies have appealed the PUC’s order in state court. Both proceedings are pending.

New Jersey’s Long-Term Capacity Agreement Pilot Program Act (LCAPP Act), Maryland’s Request for Proposal or similar activity in other states may artificially depress prices in the competitive wholesale market and have the potential to harm competitive markets and adversely impact our generation business, on both a short-term and long-term basis.

- FERC Final Rule 1000 (Order 1000), issued in July 2011, among other things directs regional planners such as PJM to (i) be more flexible in how they plan for future transmission build (ii) eliminate any Right of First Refusal, which permits incumbent transmission owners, like us, the first opportunity to construct transmission within their respective service territories, subject to certain exceptions, and (iii) allocate costs for transmission projects in a way that roughly matches costs with benefits, while leaving flexibility to the regions to determine precise cost allocation methodologies. In June 2012, PSEG appealed this Order in federal court. Other companies and state commissions have filed appeals as well. PJM is currently conducting a stakeholder process to develop implementing details regarding Order 1000. An expected outcome of this process is the construction of more transmission and the opening up of transmission construction and ownership to third-party developers and to incumbents seeking to build outside of their service territories. We cannot predict the final outcome or impact on us; however, specific implementation of Order 1000 in the various regions, including within our service territory, may expose us to competition for construction of transmission, additional regulatory considerations and potential delay with respect to future transmission projects.
- On March 30, 2012, the FERC issued an order finding that allocation of costs associated with high voltage (500 kV and higher) transmission projects in PJM to all customers in PJM is just and reasonable. This order, which has been challenged on rehearing, therefore preserves the current cost allocation for the Susquehanna-Roseland project. However, the FERC also stated in its order that other cost allocation methodologies could be just and reasonable and this may lead to the adoption of a different cost allocation methodology for transmission in PJM in the future.
- During 2012, the SEC and the Commodity Futures Trading Commission (CFTC) continued efforts to enact stricter regulation over swaps and derivatives. The CFTC has issued Notices of Proposed Rulemakings on many of the key issues and is in the process of issuing Final Rules on these issues. In May 2012, the CFTC issued a Final Rule regarding the definition of a swap dealer and, in July 2012, the CFTC voted to issue a Final Rule regarding the definition of a swap, but this rule has yet to be published. We are carefully monitoring these new rules as they are issued to analyze the potential impact on our swap and derivatives transactions, including any potential increase in our collateral requirements.

### Operational Excellence

Our nuclear and fossil facilities continued their strong operating performance through the first six months of 2012. Our nuclear units have achieved a capacity factor of 92.7% and our combined cycle units have continued to improve their forced outage rates. Overall, generation volumes for the first half of 2012 were 25.8 TWh, approximately 5% lower than in 2011 due primarily to reduced demands due to milder weather in 2012.

In the second quarter of 2012, we received the final approvals for the 10-year contract that we won in December 2011 to manage Long Island Power Authority’s electric transmission and distribution system in Long Island, New York. The contract, which commences January 1, 2014, represents an opportunity to improve returns and is recognition of our history of strong reliability and customer satisfaction.

### Financial Strength

Our cash from operations has remained strong. During the first six months of 2012, we made approximately $1.3 billion in capital expenditures, paid dividends of $359 million and made our entire planned pension and other postretirement employee benefit contributions for the year 2012 of $135 million.

In March 2012, Power’s $1.525 billion and PSEG’s $477 million credit facilities that were set to expire in December 2012 were replaced with $1.6 billion and $500 million credit facilities, respectively, expiring in March 2017. As of June 30, 2012, our total credit capacity was $4.3 billion and we had over $750 million of cash on hand.

On January 31, 2012, we entered into a specific matter closing agreement settling our dispute with the IRS over certain lease transactions. This agreement settles the international leveraged lease dispute with finality for all tax periods in which we realized tax deductions from these transactions. Also on January 31, 2012, we signed a settlement agreement covering all audit issues for tax years 1997 through 2003. On March 26, 2012, we executed a formal settlement agreement covering all audit issues for tax years 2004 through 2006. These two agreements conclude 10 years of audits for us and the leasing issue for all tax years.

### Disciplined Investment

We seek to invest in areas that complement our existing businesses and provide attractive risk-adjusted returns. These areas include upgrading critical energy infrastructure, responding to trends in environmental protection and providing new energy supplies in domestic markets with growing demand. We also have several projects where we are investing to continue to improve our operational performance. Over the past few years, we have shifted our focus to investing at the utility. Our capital expenditure forecast includes over $6.7 billion in spending over the next three years, over 75% of which is at PSE&G.

- We are continuing to pursue obtaining the necessary regulatory approvals for the Susquehanna-Roseland transmission project including approval from the National Park Service (NPS), which has resulted in a delay to the project implementation date. In March 2012, the NPS identified a “preferred alternative” for the final form of its Draft Environmental Impact Statement (EIS), under which the project would follow the route of the existing transmission line. This route was the one approved by state regulators including the BPU. The final EIS is expected to be issued in October 2012. Currently, the expected in-service date for the Eastern segment of the project is June 2014 and for the Western segment is June 2015, although further delays are possible. The cost of construction is up to an estimated $790 million for this project. As of June 30, 2012, total capital expenditures were $217 million.
- We are continuing the process of obtaining regulatory approvals for the North East Grid project, a 230 kV project running from Roseland to Hudson with an expected in-service date of June 2015 and an estimated cost of construction of $895 million. In June 2012, we obtained the major regulatory approvals for another 230 kV project, the North-Central Reliability project, located in the northern and central portions of New Jersey with an expected in-service date of June 2014 and an estimated cost of construction of up to $390 million. Construction of this project has commenced.
- We have made additional investments in solar power in New Jersey. Under our solar loan program we have provided a total of $177 million in loans for 721 projects as of June 30, 2012, representing 55 MW to date. Under our Solar 4 All program, we have made total program expenditures of approximately $401 million as of June 30, 2012. Approximately 30 MW of solar panels have been installed on distribution poles and another 36 MW representing 20 projects have been placed into service. Additional projects are in various stages of development. Our total anticipated expenditures to develop all approved 80 MW are approximately $456 million. The BPU has concluded a generic stakeholder proceeding to examine whether utility rate-based solar programs should be modified, expanded or terminated in the future, and has determined that utility rate-based solar programs should be continued under defined scope and size parameters.

On July 23, 2012, the Governor of New Jersey signed legislation that, among other things, requires energy providers, including BGS providers and third party suppliers, to increase the amount of power in their portfolios derived from solar electricity, increasing the demand for Solar Renewable Energy Credits and increasing the potential for additional utility solar generation investment.

On July 31, 2012, PSE&G filed for an extension of its Solar 4 All program. In this filing, PSE&G is seeking BPU approval for up to $690 million to develop 136 MW of utility-owned solar photovoltaic systems over a five year period starting in 2013. Consistent with the existing Solar 4 All program, PSE&G proposes to sell the energy and capacity from the solar systems in the PJM wholesale energy and capacity markets.

Also, consistent with the BPU’s generic proceeding on solar, PSE&G filed for an additional extension of our Solar Loan program (Solar Loan III) on July 31, 2012. In the filing, PSE&G is seeking BPU approval to provide financing support for the installation of 97 MW of solar systems by providing loans to qualified customers. The total investment of the proposed Solar Loan III program is anticipated to be up to $193 million once the program is fully subscribed, projects are built and loans are closed.

The estimated project costs included in the July 31, 2012 filings for extensions of our Solar 4 All and Solar Loan III programs are not included in our $6.7 billion three-year capital forecast.

- Our Capital Infrastructure Program (CIP II) provides for approximately $273 million in accelerated capital investments in our electric and gas infrastructure through 2012. As of June 30, 2012, total capital expenditures since inception of this program were $177 million.
- We made additional expenditures under our Energy Efficiency and Demand Response programs. As of June 30, 2012, total capital expenditures since inception of these projects were $147 million for Energy Efficiency Economic Stimulus (EEE), $2 million for EEE Extension and $43 million for Carbon Abatement and $23 million for Demand Response.
- We continued various construction activities at Power, including a steam path retrofit and extended power uprate at Peach Bottom and we completed construction of new gas-fired peaking units at Kearny and in Connecticut (see Note 8. Commitments and Contingent Liabilities and Part II. Item 5. Other Information for additional information). This additional capacity at Kearny was bid into and has cleared the RPM capacity auction, and the additional capacity in Connecticut is subject to a contract with a Connecticut utility.
- We are continuing our efforts to obtain an Early Site Permit for a new nuclear generating station to be located at the current site of Salem and Hope Creek stations. The Nuclear Regulatory Commission (NRC) acceptance review is complete and agency evaluation is underway. There were no petitions filed for permission to intervene. The current NRC schedule would likely result in issuance of the Early Site Permit in 2014.
- In January 2012, we acquired an additional 25 MW solar project at Energy Holdings, currently under construction in Arizona. Completion of this project is expected in 2012. All of the energy, capacity and environmental attributes generated by the project in the first 20 years are expected to be sold under a long-term power purchase agreement. The total investment for the project will be approximately $75 million.

There is no guarantee that the projects described above or any future initiatives will be achieved since many issues need to be favorably resolved, such as regulatory approvals. Delays in the construction schedules of our projects could impact the timing of expected revenues.

### RESULTS OF OPERATIONS

The results for PSEG, PSE&G, Power and Energy Holdings for the three months and six months ended June 30, 2012 and 2011 are presented below:

| Earnings (Losses) | Three Months Ended June 30, 2012 Millions | 2011 | Six Months Ended June 30, 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| Power | $104 | $205 | $357 | $502 |
| PSE&G | 101 | 105 | 298 | 268 |
| Energy Holdings | 2 | 5 | 42 | 2 |
| Other (A) | 4 | 5 | 7 | 10 |
| **PSEG Income from Continuing Operations** | 211 | 320 | 704 | 782 |
| Income (Loss) from Discontinued Operations (B) | 0 | 3 | 0 | 67 |
| **PSEG Net Income** | **$211** | **$323** | **$704** | **$849** |

| Earnings Per Share (Diluted) | Three Months Ended June 30, 2012 | 2011 | Six Months Ended June 30, 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| **PSEG Income from Continuing Operations** | **$0.42** | **$0.63** | **$1.39** | **$1.54** |
| Income (Loss) from Discontinued Operations (B) | 0.00 | 0.00 | 0.00 | 0.13 |
| **PSEG Net Income** | **$0.42** | **$0.63** | **$1.39** | **$1.67** |

(A) Other primarily includes parent company interest and financing costs, donations and certain administrative and general expenses.

(B) See Note 4. Discontinued Operations and Dispositions.

Our results include the realized gains, losses and earnings on Power’s Nuclear Decommissioning Trust (NDT) Fund and other related NDT activity. This includes the net realized gains, interest and dividend income and other costs related to the NDT Fund which are recorded in Other Income and Deductions. This also includes credit-related impairments on certain NDT securities which are included in Other-Than-Temporary Impairments and the interest accretion expense on Power’s nuclear Asset Retirement Obligation (ARO), which is recorded in Operation and Maintenance Expense and the depreciation related to the ARO asset.

Our results also include the after-tax impacts of non-trading mark-to-market (MTM) activity, which consist of the financial impact from positions with forward delivery dates.

The quarter-over-quarter and six month-over-six month variances in our Income from Continuing Operations include the changes related to NDT and MTM shown in the chart below:

|  | Three Months Ended June 30, 2012 Millions, after tax | 2011 | Six Months Ended June 30, 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| NDT Fund Income (Expense) | $4 | $15 | $9 | $42 |
| Non-Trading MTM Gains (Losses) | $(10) | $4 | $42 | $8 |

In addition to the changes in NDT and MTM, our $109 million and $78 million decreases in Income from Continuing Operations for the three months and six months ended June 30, 2012, respectively, were driven primarily by:

- lower average pricing and volumes for electricity sold under our BGS contracts,
- lower realized prices and/or lower sales volumes in the various power pools, and
- lower gas volumes and demand due to milder winter weather, partially offset by the WNC.

The decrease for the six months ended June 30, 2012 was partially offset by increased earnings from transmission and renewable investments at PSE&G and lower tax expense due to the settlement of 10 years of IRS audits.

### PSEG

Our results of operations are primarily comprised of the results of operations of our operating subsidiaries, Power, PSE&G and Energy Holdings, excluding charges related to intercompany transactions, which are eliminated in consolidation. We also include certain financing costs, charitable contributions and general and administrative costs at the parent company. For additional information on intercompany transactions, see Note 17. Related-Party Transactions. For an explanation of the variances, see the discussions for Power, PSE&G and Energy Holdings that follow the table below:

|  | Three Months Ended June 30, 2012 Millions | 2011 | Increase/ (Decrease) 2012 vs 2011 Millions% |  | Six Months Ended June 30, 2012 Millions | 2011 | Increase/ (Decrease) 2012 vs 2011 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $2,098 | $2,469 | $(371) | (15) | $4,973 | $5,823 | $(850) | (15) |
| Energy Costs | 761 | 1,010 | (249) | (25) | 1,940 | 2,573 | (633) | (25) |
| Operation and Maintenance | 629 | 575 | 54 | 9 | 1,257 | 1,226 | 31 | 3 |
| Depreciation and Amortization | 255 | 235 | 20 | 9 | 511 | 476 | 35 | 7 |
| Taxes Other than Income Taxes | 20 | 28 | (8) | (29) | 49 | 71 | (22) | (31) |
| Income from Equity Method Investments | 2 | 4 | (2) | (50) | 2 | 7 | (5) | (71) |
| Other Income and (Deductions) | 32 | 40 | (8) | (20) | 60 | 103 | (43) | (42) |
| Other-Than-Temporary Impairments | 7 | 1 | 6 | N/A | 12 | 5 | 7 | N/A |
| Interest Expense | 103 | 117 | (14) | (12) | 204 | 244 | (40) | (16) |
| Income Tax Expense | 146 | 227 | (81) | (36) | 358 | 556 | (198) | (36) |
| Income (Loss) from Discontinued Operations | 0 | 3 | (3) | N/A | 0 | 67 | (67) | N/A |

70

### Power

|  | Three Months Ended June 30, 2012 Millions | 2011 | Increase/ (Decrease) 2012 vs 2011 | Six Months Ended June 30, 2012 | 2011 | Increase/ (Decrease) 2012 vs 2011 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Income from Continuing Operations | $104 | $205 | $(101) | $357 | $502 | $(145) |
| Income (Loss) from Discontinued Operations, net of tax | 0 | 3 | (3) | 0 | 67 | (67) |
| Net Income | $104 | $208 | $(104) | $357 | $569 | $(212) |

For the three months and six months ended June 30, 2012, the primary reasons for the $101 million and $145 million decreases in Income from Continuing Operations were

- lower average prices realized on generation sold into the PJM and New York power pools,
- lower average pricing and lower volumes of electricity sold under our BGS contracts, net of lower cost to serve,
- lower volumes on wholesale load contracts in PJM, lower operating reserve, ancillary and Reliability Must Run (RMR) revenues primarily in PJM and New England,
- lower average pricing and volumes of gas sold under our BGSS contracts, net of lower cost to serve, as a result of warmer winter weather in 2012,
- higher operation and maintenance costs in 2012 at our nuclear plants, and
- lower net realized gains on the NDT Fund.

These decreases were partially offset by

- lower operation and maintenance costs in 2012 at our fossil plants, and
- lower interest expense due to the maturity of Senior Notes in December 2011.

The decrease for the three months ended June 30, 2012 was also attributable to unfavorable MTM activity. The decrease for the six months ended June 30, 2012 was partially offset by favorable MTM activity and lower interest expense due to the early redemption of Senior Notes in April 2011.

The quarter and year-to-date details for these variances are discussed below:

|  | Three Months Ended June 30, 2012 Millions | 2011 | Increase/ (Decrease) 2012 vs 2011 Millions% |  | Six Months Ended June 30, 2012 Millions | 2011 | Increase/ (Decrease) 2012 vs 2011 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $985 | $1,285 | $(300) | (23) | $2,546 | $3,252 | $(706) | (22) |
| Energy Costs | 447 | 603 | (156) | (26) | 1,269 | 1,738 | (469) | (27) |
| Operation and Maintenance | 284 | 271 | 13 | 5 | 525 | 548 | (23) | (4) |
| Depreciation and Amortization | 58 | 56 | 2 | 4 | 115 | 110 | 5 | 5 |
| Other Income (Deductions) | 20 | 35 | (15) | (43) | 35 | 93 | (58) | (62) |
| Other-Than-Temporary Impairments | 7 | 1 | 6 | N/A | 12 | 3 | 9 | N/A |
| Interest Expense | 32 | 41 | (9) | (22) | 62 | 92 | (30) | (33) |
| Income Tax Expense | 73 | 143 | (70) | (49) | 241 | 352 | (111) | (32) |
| Income (Loss) from Discontinued Operations | 0 | 3 | (3) | N/A | 0 | 67 | (67) | N/A |

71

### Three Months ended June 30, 2012 as compared to 2011

**Operating Revenues** decreased $300 million due to

***Generation Revenues*** decreased $244 million due primarily to

- lower net revenues of $113 million due primarily to lower average realized and unrealized prices for our generation sold into the PJM and New York power pools, partially offset by higher prices on generation sales in New England,
- a decrease of $75 million due primarily to lower average pricing and lower volumes of electricity sold under our BGS contracts primarily as a result of customer migration and re-contracting,
- a decrease of $42 million due to lower volumes on wholesale load contracts in the PJM and New England regions, and
- a decrease of $25 million due to lower operating reserve revenue in 2012 resulting from lower demand and lower market prices, lower ancillary revenues and lower RMR revenues in the PJM region.

***Gas Supply Revenues*** decreased $55 million due primarily to

- a decrease of $51 million in sales under the BGSS contract, substantially comprised of lower average gas prices on lower volumes of sales in 2012 due to milder winter weather during the second quarter of 2012, and
- a net decrease of $4 million due primarily to lower average gas prices on higher sales volumes to third party customers.

***Trading Revenues*** were immaterial in 2012 due to the discontinuation of trading activities in the second quarter of 2011.

### Operating Expenses

**Energy Costs** represent the cost of generation, which includes fuel costs for generation as well as purchased energy in the market, and gas purchases to meet Power’s obligation under its BGSS contract with PSE&G. Energy Costs decreased $156 million due to

- ***Generation costs*** decreased by $109 million due primarily to $83 million of lower fuel costs, primarily due to lower fossil fuel costs, reflecting the utilization of lower volumes of coal and lower natural gas prices, partially offset by the utilization of higher volumes of natural gas. The decrease was also attributable to $36 million in lower energy purchases in the PJM and New England regions as a result of lower load contract demand in 2012, and $8 million of lower CO2 emission charges. These decreases were partially offset by an increase of $18 million in congestion costs in 2012 in the PJM region.
- ***Gas costs*** decreased $47 million, principally related to obligations under the BGSS contract, reflecting lower average gas inventory costs coupled with lower sales volumes in 2012 due to milder winter weather during the second quarter of 2012.

**Operation and Maintenance** increased $13 million due primarily to higher refueling costs in 2012 for our 100%-owned Hope Creek nuclear facility as compared to our portion of refueling costs in 2011 for our 57%-owned Salem 2 nuclear unit. This increase was partially offset by lower planned fossil outage and maintenance costs in 2012, primarily at our coal-fired Mercer facility and gas-fired Linden and Bergen plants in New Jersey and our coal-fired Keystone plant in Pennsylvania.

**Depreciation and Amortization** experienced no material change.

**Other Income and (Deductions)** net decrease of $15 million was due primarily to lower net realized gains on our NDT Fund.

**Other-Than-Temporary Impairments** increased $6 million due primarily to impairments on the NDT Fund in 2012.

**Interest Expense** decreased $9 million due primarily to the early redemption of $600 million of 6.95% Senior Notes in December 2011.

**Income Tax Expense** decreased $70 million in 2012 due primarily to lower pre-tax income.

### Income (Loss) from Discontinued Operations

In 2011, we sold our two 1,000 MW combined-cycle generating facilities in Texas in separate transactions. In March 2011, we completed the sale of one plant for proceeds of $352 million at an after-tax gain of $54 million. In July 2011, we completed the sale of the second plant for proceeds of $335 million at an after-tax gain of $25 million. The sale of the second plant was reflected in Power’s Condensed Consolidated Financial Statements for the third quarter of 2011. The results of operations for both plants are included for the second quarter of 2011 in this category. See Item 8. Financial Statements and Supplementary Data—Note 4. Discontinued Operations and Dispositions for additional information.

### Six Months ended June 30, 2012 as compared to 2011

**Operating Revenues** decreased $706 million due to

***Generation Revenues*** decreased $429 million due primarily to

- lower net revenues of $144 million due primarily to lower average realized and unrealized prices for our generation sold into the PJM and New York power pools,
- a decrease of $137 million due primarily to lower average pricing and lower volumes of electricity sold under our BGS contracts primarily as a result of warmer winter weather in 2012 as well as customer migration,
- a decrease of $69 million due to lower volumes on wholesale load contracts in the PJM and New England regions, and
- a decrease of $64 million due to lower operating reserve revenue in 2012 resulting from lower demand and lower average market prices, lower ancillary revenues and lower RMR revenues in the PJM region.

***Gas Supply Revenues*** decreased $310 million due primarily to

- a net decrease of $272 million in sales under the BGSS contract, substantially comprised of lower average gas prices on lower volumes of sales in 2012 due to warmer average temperatures during the first quarter of 2012, and
- a net decrease of $38 million due primarily to lower average gas prices partially offset by higher sales volumes to third party customers.

***Trading Revenues*** increased $33 million in 2012 due to the discontinuation of trading activities in the second quarter of 2011. As a result, the increase is due primarily to the absence of losses on electric energy supply contracts recognized in 2011.

### Operating Expenses

**Energy Costs** represent the cost of generation, which includes fuel costs for generation as well as purchased energy in the market, and gas purchases to meet Power’s obligation under its BGSS contract with PSE&G. Energy Costs decreased $469 million due to

- ***Gas costs*** decreased $272 million, principally related to obligations under the BGSS contract, reflecting lower average gas inventory costs coupled with lower sales volumes in 2012 due primarily to warmer average temperatures during the first quarter of 2012.
- ***Generation costs*** decreased by $197 million due primarily to $184 million of lower fuel costs, reflecting the utilization of lower volumes of both coal and oil and lower natural gas prices, partially offset by the utilization of higher volumes of nuclear fuel at higher prices in 2012. The decrease was also attributable to $68 million in lower energy purchases in the PJM region as a result of lower load contract demand in 2012, and $13 million of lower CO2 emission charges. These decreases were partially offset by an increase of $68 million in congestion costs.

**Operation and Maintenance** decreased $23 million due primarily to lower planned outage and maintenance costs in 2012, mainly at our gas-fired Bethlehem facility in New York, Bergen and Linden gas-fired plants and Mercer coal-fired plant in New Jersey, and coal-fired Keystone plant in Pennsylvania. This decrease was partially offset by refueling costs in 2012 for our 100%-owned Hope Creek nuclear facility as compared to our portion of refueling costs in 2011 for our 57%-owned Salem 2 nuclear unit.

**Depreciation and Amortization** increased $5 million due primarily to higher depreciable asset bases at Fossil and Nuclear, largely resulting from placing a new 267 MW gas-fired peaking unit at Kearny, New Jersey and 130 MW gas-fired peaking capacity at New Haven, Connecticut into service on June 1, 2012 as well as completion of the steam path retrofit upgrade at Peach Bottom Unit 3 in October 2011.

**Other Income and (Deductions)** net decrease of $58 million was due primarily to lower net realized gains on our NDT Fund.

**Other-Than-Temporary Impairments** increased $9 million due primarily to impairments on the NDT Fund in 2012.

**Interest Expense** decreased $30 million due primarily to

- a decrease of $26 million resulting primarily from the redemption of $606 million of 7.75% Senior Notes in early April 2011 and the early redemption of $600 million of 6.95% Senior Notes in December 2011, and
- a $4 million decrease due to interest costs that we capitalized in 2012 for projects while under construction, primarily the gas-fired peaking facilities at Kearny, New Jersey and New Haven, Connecticut, both of which we began building in the second quarter of 2011.

**Income Tax Expense** decreased $111 million in 2012 due primarily to lower pre-tax income.

### Income (Loss) from Discontinued Operations

As discussed above, we sold our two Texas plants in March 2011 and July 2011, respectively. The results of operations of both plants, including the after-tax gain of $54 million from the March 2011 sale, are included in this category. See Item 8. Financial Statements and Supplementary Data—Note 4. Discontinued Operations and Dispositions for additional information.

### PSE&G

|  | Three Months Ended June 30, 2012 Millions | 2011 | Increase/ (Decrease) 2012 vs 2011 | Six Months Ended June 30, 2012 | 2011 | Increase/ (Decrease) 2012 vs 2011 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Income from Continuing Operations | $101 | $105 | $(4) | $298 | $268 | $30 |
| Net Income | $101 | $105 | $(4) | $298 | $268 | $30 |

For the three months ended June 30, 2012, the primary reasons for the $4 million decrease in Income from Continuing Operations were

- higher Operation and Maintenance costs,
- partially offset by higher transmission formula rates and
- higher Weather Normalization Charge (WNC).

For the six months ended June 30, 2012, the primary reasons for the $30 million increase in Income from Continuing Operations were

- higher WNC,
- higher transmission formula rates, and
- tax benefits related to settlement of IRS audits,
- partially offset by lower gas volumes and demands due to milder winter weather.

The quarter and year-to-date details for these variances are discussed below:

|  | Three Months Ended June 30, 2012 Millions | 2011 | Increase/ (Decrease) 2012 vs 2011 Millions% |  | Six Months Ended June 30, 2012 Millions | 2011 | Increase/ (Decrease) 2012 vs 2011 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $1,407 | $1,571 | $(164) | (10) | $3,346 | $3,877 | $(531) | (14) |
| Energy Costs | 622 | 815 | (193) | (24) | 1,624 | 2,181 | (557) | (26) |
| Operation and Maintenance | 350 | 304 | 46 | 15 | 726 | 672 | 54 | 8 |
| Depreciation and Amortization | 188 | 172 | 16 | 9 | 378 | 351 | 27 | 8 |
| Taxes Other Than Income Taxes | 20 | 28 | (8) | (29) | 49 | 71 | (22) | (31) |
| Other Income (Deductions) | 11 | 4 | 7 | N/A | 21 | 8 | 13 | N/A |
| Other-Than Temporary Impairments | 0 | 0 | 0 | 0 | 0 | 1 | (1) | N/A |
| Interest Expense | 74 | 78 | (4) | (5) | 147 | 157 | (10) | (6) |
| Income Tax Expense (Benefit) | 63 | 73 | (10) | (14) | 145 | 184 | (39) | (21) |

### Three Months ended June 30, 2012 as compared to 2011

**Operating Revenues** decreased $164 million due primarily to

***Commodity Revenue*** decreased $193 million due to lower Electric and Gas revenues. This is entirely offset as savings in Energy Costs. PSE&G earns no margin on the provision of BGS and BGSS.

- Electric revenues decreased $135 million due primarily to $107 million in lower BGS revenues and $28 million in lower revenues from the sale of Non-Utility Generation (NUG) energy and collections of Non-Utility Generation Charges (NGC) due primarily to lower prices. BGS sales decreased 15% due primarily to customer migration to third party suppliers (TPS); in contrast, delivery sales decreased only 2%.
- Gas revenues decreased $58 million due to lower BGSS prices of $42 million and lower BGSS volumes of $16 million due to weather.

***Other Operating Revenues*** decreased $1 million due primarily to lower miscellaneous electric operating revenues, partially offset by increased revenues from our appliance repair business.

***Delivery Revenues*** increased $23 million due primarily to an increase in transmission revenues.

- Transmission revenues were $20 million higher due primarily to net rate increases.
- Gas distribution revenues increased $6 million due primarily to a higher WNC and higher Capital Infrastructure Program (CIP) revenue, partially offset by lower sales volume and lower Transitional Energy Facilities Assessment (TEFA) revenue due to a lower TEFA rate and lower sales volumes.
- Electric distribution revenues decreased $3 million due primarily to lower TEFA revenue due to a lower TEFA rate and lower sales volumes, partially offset by higher Solar, Energy Efficiency and Conservation Program (Solar/EE) revenue and higher CIP revenue.

***Clause Revenues*** increased $7 million due primarily to higher Securitization Transition Charge (STC) revenues of $4 million, a higher Margin Adjustment Clause (MAC) of $2 million and higher Societal Benefit Charges (SBC) of $1 million. The changes in STC, MAC and SBC amounts were entirely offset by the amortization of related costs (Regulatory Assets) in O&M, Depreciation and Amortization and Interest Expense. PSE&G does not earn margin on SBC, MAC or STC collections.

**Energy Costs** decreased $193 million. This is entirely offset by Commodity Revenue.

- Electric costs decreased $135 million due to $69 million or 10% in lower BGS and NUG volumes due to customer migration to TPS, $62 million of lower BGS prices, and $4 million for decreased deferred cost recovery.
- Gas costs decreased $58 million due to $42 million or 24% in lower prices and $16 million or 9% in lower sales volumes due primarily to weather.

**Operation and Maintenance** increased $46 million due primarily to

- a $14 million increase in costs recognized related to SBC, Solar/EE and CIP,
- a $9 million increase in transmission related costs,
- a $6 million increase in payroll costs, and
- a $5 million increase in pension and other postretirement benefits (OPEB) expenses.

**Depreciation and Amortization** increased $16 million due primarily to

- an increase of $10 million for amortization of Regulatory Assets, and
- an increase of $6 million for additional plant in service.

**Taxes Other Than Income Taxes** decreased $8 million due to a lower TEFA rate and lower sales volumes for electric and gas.

**Other Income and (Deductions)** net increase of $7 million was due primarily to a $5 million increase in capitalized allowance for Equity Funds used during construction and a $2 million increase in Solar Loan interest income.

**Interest Expense** decreased $4 million due primarily to the $101 million redemption of securitization debts, partially offset by the interest associated with the $450 million MTN issued in May 2012. See Note 9. Changes in Capitalization for details.

**Income Tax Expense** decreased $10 million due primarily to lower pre-tax income.

### Six Months ended June 30, 2012 as compared to 2011

**Operating Revenues** decreased $531 million due primarily to

***Commodity Revenue*** decreased $557 million due to lower Electric and Gas revenues. This is entirely offset as savings in Energy Costs. PSE&G earns no margin on the provision of BGS and BGSS.

- Gas revenues decreased $298 million due to lower BGSS volumes of $163 million and lower BGSS prices of $135 million. The average price of gas was 16% lower in 2012 than in 2011.
- Electric revenues decreased $259 million due primarily to $230 million in lower BGS revenues and $29 million in lower revenues from the sale of NUG energy and collections of NGC due primarily to lower prices. BGS sales decreased 16% due primarily to customer migration to TPS; in contrast, delivery sales decreased only 3%.

***Clause Revenues*** were flat due primarily to higher STC revenues of $6 million and higher MAC of $1 million, offset by lower SBC of $7 million. The changes in STC and SBC amounts were entirely offset by the amortization of related costs (Regulatory Assets) in O&M, Depreciation and Amortization and Interest Expense. PSE&G does not earn margin on SBC, MAC or STC collections.

***Delivery Revenues*** increased $24 million due primarily to an increase in transmission revenues.

- Transmission revenues were $42 million higher due primarily to net rate increases.
- Gas distribution revenues decreased $12 million due primarily to lower sales volume, lower TEFA revenue due to a lower TEFA rate and lower Solar/EE revenue, partially offset by higher WNC and higher CIP revenue.
- Electric distribution revenues decreased $6 million due primarily to lower TEFA revenue due to a lower TEFA rate and lower sales volumes, partially offset by higher Solar/EE revenue and higher CIP revenue.

***Other Operating Revenues*** increased $2 million due primarily to increased revenues from our appliance repair business, partially offset by lower miscellaneous electric operating revenues.

**Energy Costs** decreased $557 million. This is entirely offset by Commodity Revenue.

- Gas costs decreased $298 million due to $163 million or 19% in lower sales volumes due primarily to weather and $135 million or 16% in lower prices.
- Electric costs decreased $259 million due to $135 million or 10% in lower BGS and NUG volumes due to customer migration to TPS, $97 million of lower BGS prices, and $27 million for decreased deferred cost recovery.

**Operation and Maintenance** increased $54 million due primarily to

- a $15 million increase in costs recognized related to SBC, Solar/EE and CIP,
- a $13 million increase in transmission related costs,
- a $9 million increase in payroll costs, and
- a $8 million increase in pension and OPEB expenses.

**Depreciation and Amortization** increased $27 million due primarily to

- an increase of $16 million for amortization of Regulatory Assets, and
- an increase of $12 million for additional plant in service.

**Taxes Other Than Income Taxes** decreased $22 million due to a lower TEFA rate and lower sales volumes for electric and gas.

**Other Income and (Deductions)** net increase of $13 million was due primarily to a $9 million increase in capitalized allowance for Equity Funds used during construction and a $3 million increase in Solar Loan interest income.

**Other-Than-Temporary Impairments** experienced no material change.

**Interest Expense** decreased $10 million due primarily to the $101 million redemption of securitization debts, partially offset by the interest associated with the $450 million Medium-Term Notes issued in May 2012. See Note 9. Changes in Capitalization for details.

**Income Tax Expense** decreased $39 million due primarily to tax benefits related to settlement of IRS tax audits.

### Energy Holdings

|  | Three Months Ended June 30, 2012 Millions | 2011 | Increase/ (Decrease) 2012 vs 2011 | Six Months Ended June 30, 2012 | 2011 | Increase/ (Decrease) 2012 vs 2011 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Income from Continuing Operations | $2 | $5 | $(3) | $42 | $2 | $40 |
| Net Income | $2 | $5 | $(3) | $42 | $2 | $40 |

For the six months ended June 30, 2012, the primary reason for the $40 million increase in Income from Continuing Operations was tax benefits related to the settlement of IRS tax audits.

### LIQUIDITY AND CAPITAL RESOURCES

The following discussion of our liquidity and capital resources is on a consolidated basis, noting the uses and contributions, where material, of our three direct operating subsidiaries.

### Operating Cash Flows

Our operating cash flows combined with cash on hand and financing activities are expected to be sufficient to fund capital expenditures and shareholder dividend payments.

For the six months ended June 30, 2012, our operating cash flow decreased $17 million as compared to the same period in 2011. The net change was due primarily to net changes from Power and PSE&G, as discussed below.

### Power

Power’s operating cash flow decreased $294 million from $1,146 million to $852 million for the six months ended June 30, 2012, as compared to the same period in 2011, primarily resulting from lower earnings, partially offset by a decrease of $86 million in benefit plan funding.

### PSE&G

PSE&G’s operating cash flow increased $180 million from $279 million to $459 million for the six months ended June 30, 2012 as compared to the same period in 2011, due primarily to higher earnings combined with

- a decrease of $173 million in benefit plan funding, and
- a decrease of $108 million in net prepayments,
- partially offset by a decrease of $96 million due to lower collections of customer receivables.

### Short-Term Liquidity

PSEG meets its short-term liquidity requirements, as well as those of Power, primarily through the issuance of commercial paper. PSE&G maintains its own separate commercial paper program to meet its short-term liquidity requirements. Both commercial paper programs are fully back-stopped by their own separate credit facilities.

The commitments under our credit facilities are provided by a diverse bank group. As of June 30, 2012, no single institution represented more than 8% of the total commitments in our credit facilities.

As of June 30, 2012, our total credit capacity was in excess of our anticipated maximum liquidity requirements through 2012.

Each of our credit facilities is restricted as to availability and use to the specific companies as listed below; however, if necessary, the PSEG facilities can also be used to support our subsidiaries’ liquidity needs. Our total credit facilities and available liquidity as of June 30, 2012 were as follows:

| Company/Facility PSEG | As of June 30, 2012 Total Facility Millions | Usage |  | Available Liquidity | Expiration Date | Primary Purpose |
| --- | ---: | ---: | --- | ---: | --- | --- |
| 5-year Credit Facility | $500 | $12 | (A) | $488 | Mar 2017 | Commercial Paper (CP) Support/Funding/Letters of Credit |
| 5-year Credit Facility | 500 | 0 |  | 500 | Apr 2016 | CP Support/Funding/Letters of Credit |
| **Total PSEG** | **$1,000** | **$12** |  | **$988** |  |  |
| **Power** |  |  |  |  |  |  |
| 5-year Credit Facility | $1,600 | $121 | (A) | $1,479 | Mar 2017 | Funding/Letters of Credit |
| 5-year Credit Facility | 1,000 | 0 |  | 1,000 | Apr 2016 | Funding/Letters of Credit |
| Bilateral Credit Facility | 100 | 100 | (A) | 0 | Sept 2015 | Letters of Credit |
| **Total Power** | **$2,700** | **$221** |  | **$2,479** |  |  |
| **PSE&G** |  |  |  |  |  |  |
| 5-year Credit Facility | $600 | $16 | (A) | $584 | Apr 2016 | CP Support/Funding/Letters of Credit |
| **Total PSE&G** | **$600** | **$16** |  | **$584** |  |  |
| **Total** | **$4,300** | **$249** |  | **$4,051** |  |  |

(A) Includes amounts related to letters of credit outstanding.

### Long-Term Debt Financing

PSE&G has $300 million of 5.13% Medium Term Notes maturing in September 2012. For a discussion of our long-term debt transactions during 2012, see Note 9. Changes in Capitalization.

### Common Stock Dividends

For information related to cash dividends on our common stock, see Note 15. Earnings Per Share. On July 17, 2012, The Board of Directors declared a quarterly dividend of $0.3550 per share of common stock for the third quarter of 2012. We expect to continue to pay cash dividends on our common stock; however, the declaration and payment of future dividends to holders of our common stock will be at the discretion of the Board of Directors and will depend upon many factors, including our financial condition, earnings, capital requirements of our businesses, alternate investment opportunities, legal requirements, regulatory constraints, industry practice and other factors that the Board of Directors deems relevant.

### Credit Ratings

If the rating agencies lower or withdraw our credit ratings, such revisions may adversely affect the market price of our securities and serve to materially increase our cost of capital and limit access to capital. Outlooks assigned to ratings are as follows: stable, negative (Neg) or positive (Pos). There is no assurance that the ratings will continue for any given period of time or that they will not be revised by the rating agencies, if, in their respective judgments, circumstances warrant. Each rating given by an agency should be evaluated independently of the other agencies’ ratings. The ratings should not be construed as an indication to buy, hold or sell any security. In April 2012, S&P published updated credit opinions that left the ratings and outlooks for Power and PSE&G unchanged. In May 2012, S&P published an updated credit opinion for PSEG that left its ratings and outlook unchanged. In May 2012, Moody’s published updated credit opinions on PSEG, Power and PSE&G. Moody’s upgraded PSE&G’s Mortgage Bond Rating to A1 from A2 and revised the outlook to stable from positive. PSEG’s and Power’s ratings and outlooks remained unchanged. In July 2012, Fitch published updated credit opinions on PSEG, Power and PSE&G. Fitch upgraded PSE&G’s Mortgage Bond Rating to A+ from A and its stable outlook remained unchanged. PSEG’s and Power’s ratings and outlooks remained unchanged.

|  | Moody’s(A) | S&P(B) | Fitch(C) |
| --- | --- | --- | --- |
| **PSEG** |  |  |  |
| Outlook | **Stable** | **Positive** | **Stable** |
| Commercial Paper | P2 | A2 | F2 |
| **Power** |  |  |  |
| Outlook | **Stable** | **Positive** | **Stable** |
| Senior Notes | Baa1 | BBB | BBB+ |
| **PSE&G** |  |  |  |
| Outlook | **Stable** | **Positive** | **Stable** |
| Mortgage Bonds | A1 | A– | A+ |
| Commercial Paper | P2 | A2 | F2 |

(A) Moody’s ratings range from Aaa (highest) to C (lowest) for long-term securities and P1 (highest) to NP (lowest) for short-term securities.

(B) S&P ratings range from AAA (highest) to D (lowest) for long-term securities and A1 (highest) to D (lowest) for short-term securities.

(C) Fitch ratings range from AAA (highest) to D (lowest) for long-term securities and F1 (highest) to D (lowest) for short-term securities.

### CAPITAL REQUIREMENTS

We expect that all of our capital requirements over the next three years will come from a combination of internally generated funds and external debt financing. There have been no material changes to our projected construction and investment amounts through 2014 as disclosed in our Form 10-K for the year ended December 31, 2011.

### Power

During the six months ended June 30, 2012, Power made $240 million of capital expenditures, including interest capitalized during construction (IDC) but excluding $104 million for nuclear fuel, primarily related to various projects at Fossil and Nuclear. For additional information regarding current projects, see Note 8. Commitments and Contingent Liabilities.

### PSE&G

During the six months ended June 30, 2012, PSE&G made $920 million of capital expenditures, including $870 million of investment in plant, primarily for reliability of transmission and distribution systems and $50 million in solar loan investments. This does not include expenditures for cost of removal, net of salvage, of $44 million, which is included in operating cash flows.

### ACCOUNTING MATTERS

For information related to recent accounting matters, see Note 2. Recent Accounting Standards.

## Market risk

As filed, 3,265 characters.

The market risk inherent in our market-risk sensitive instruments and positions is the potential loss arising from adverse changes in commodity prices, equity security prices and interest rates as discussed in the Notes to Condensed Consolidated Financial Statements. It is our policy to use derivatives to manage risk consistent with business plans and prudent practices. We have a Risk Management Committee comprised of executive officers who utilize a risk oversight function to ensure compliance with our corporate policies and risk management practices.

Additionally, we are exposed to counterparty credit losses in the event of non-performance or non-payment. We have a credit management process, which is used to assess, monitor and mitigate counterparty exposure. In the event of non-performance or non-payment by a major counterparty, there may be a material adverse impact on our financial condition, results of operations or net cash flows.

### Commodity Contracts

The availability and price of energy-related commodities are subject to fluctuations from factors such as weather, environmental policies, changes in supply and demand, state and federal regulatory policies, market rules and other events. To reduce price risk caused by market fluctuations, we enter into supply contracts and derivative contracts, including forwards, futures, swaps and options with approved counterparties. These contracts, in conjunction with physical sales and other services, help reduce risk and optimize the value of owned electric generation capacity.

### Value-at-Risk (VaR) Models

We use VaR models to assess the market risk of our commodity businesses. The Portfolio VaR model includes our owned generation and physical contracts, as well as fixed price sales requirements, load requirements and financial derivative instruments. VaR represents the potential losses, under normal market conditions, for instruments or portfolios due to changes in market factors, for a specified time period and confidence level. We estimate VaR across our commodity businesses.

MTM VaR consists of MTM derivatives that are economic hedges, some of which qualify for hedge accounting. The MTM VaR calculation does not include market risks associated with activities that are subject to accrual accounting, primarily our generating facilities and some load serving activities.

The VaR models used are variance/covariance models adjusted for the change of positions with 95% and 99.5% confidence levels and a one-day holding period for the MTM activities. The models assume no new positions throughout the holding periods; however, we actively manage our portfolio.

| Three Months Ended June 30, 2012 95% Confidence Level, Loss could exceed VaR one day in 20 days | MTM VaR (A) Millions |
| --- | ---: |
| Period End | $15 |
| Average for the Period | $13 |
| High | $19 |
| Low | $9 |
| 99.5% Confidence Level, |  |
| Loss could exceed VaR one day in 200 days |  |
| Period End | $24 |
| Average for the Period | $21 |
| High | $30 |
| Low | $13 |

(A) As of June 30, 2012 and December 31, 2011, there was no trading VaR since we discontinued trading activities in the second quarter of 2011.

See Note 10. Financial Risk Management Activities for a discussion of credit risk.

## Controls and procedures

As filed, 1,948 characters.

### Disclosure Controls and Procedures

We have established and maintain disclosure controls and procedures as defined under Rule 13a-15(e) and 15d-15(e) promulgated under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) that are designed to provide reasonable assurance that information required to be disclosed in the reports that are filed or submitted under the Exchange Act is recorded, processed, summarized and reported and is accumulated and communicated to the Chief Executive Officer and Chief Financial Officer of each respective company, as appropriate, by others within the entities to allow timely decisions regarding required disclosure. We have established a disclosure committee which includes several key management employees and which reports directly to the Chief Financial Officer and Chief Executive Officer of each of Public Service Enterprise Group Incorporated, PSEG Power LLC, and Public Service Electric and Gas Company. The committee monitors and evaluates the effectiveness of these disclosure controls and procedures. The Chief Financial Officer and Chief Executive Officer of each of Public Service Enterprise Group Incorporated, PSEG Power LLC, and Public Service Electric and Gas Company have evaluated the effectiveness of the disclosure controls and procedures and, based on this evaluation, have concluded that disclosure controls and procedures at each respective company were effective at a reasonable assurance level as of the end of the period covered by the report.

### Internal Controls

We continually review our disclosure controls and procedures and make changes, as necessary, to ensure the quality of our financial reporting. There have been no changes in internal control over financial reporting that occurred during the second quarter of 2012 that have materially affected, or are reasonably likely to materially affect, each registrant’s internal control over financial reporting.

## Risk factors

As filed, 1,588 characters.

The Risk Factor shown below updates a risk factor disclosed in Part I Item 1A on page 35 of our 2011 Annual Reports on Form 10-K.

**We are subject to comprehensive and evolving regulation by federal, state and local regulatory agencies that affects, or may affect, our businesses.**

We are subject to regulation by federal, state and local authorities. Changes in regulation can cause significant delays in or materially affect business planning and transactions and can materially increase our costs. Regulation affects almost every aspect of our businesses, such as our ability to:

- ***Obtain fair and timely rate relief—*** Our transmission assets are regulated by FERC and costs are recovered through rates set by FERC. Transmission formula rates, and specifically the Return on Equity (ROE) embedded in these formula rates, have recently become the target of certain state utility commissions, consumer advocates and consumer groups seeking to lower customer rates in New England. These agencies and groups have filed complaints at FERC asking the FERC to reduce the base ROE of various New England transmission owners with formula rates. They point to changes in the capital markets as justification for lowering the ROE of these companies. While we are not the subject of any of these complaints, the matter could set a precedent for FERC-regulated transmission owners with formula rates in place, such as PSE&G. Inability to obtain a fair return on our investments or to timely recover material costs not included in rates would have a material adverse effect on our business.

Filed Aug 2, 2012.
Source: SEC EDGAR, the filing index for accession 0001193125-12-332159. Last ingested by Listed: Nov 6, 2026, 17:31 ET. No prices; not investment advice.