# Exelon Corp: Form 10-Q for the period ended Mar 31, 2013

- Company: [Exelon Corp](/companies/exc.md) (CIK 1109357)
- Form: 10-Q
- Filed: 2013-05-10
- Accepted by EDGAR: May 9, 2013, 21:48 ET
- Period: 2013-03-31
- Accession: 0001193125-13-211545
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1109357/000119312513211545/d525646d10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1109357/000119312513211545/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2013-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2013-01-01 to 2013-03-31 | $6.08bn | us-gaap:Revenues |
| Operating income | 3 months, 2013-01-01 to 2013-03-31 | $508.0m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2013-01-01 to 2013-03-31 | $617.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2013-01-01 to 2013-03-31 | $56.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2013-01-01 to 2013-03-31 | $1.0m | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2013-01-01 to 2013-03-31 | −$0.01 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2013-01-01 to 2013-03-31 | −$0.01 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2013-01-01 to 2013-03-31 | 855,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2013-01-01 to 2013-03-31 | $859.0m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2013-01-01 to 2013-03-31 | $1.45bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2013-01-01 to 2013-03-31 | $450.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2013-03-31 | $772.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2013-03-31 | $9.27bn | us-gaap:AssetsCurrent |
| Total assets | at 2013-03-31 | $78.24bn | us-gaap:Assets |
| Current liabilities | at 2013-03-31 | $8.32bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2013-03-31 | $56.83bn | us-gaap:Liabilities |
| Long-term debt | at 2013-03-31 | $16.21bn | us-gaap:LongTermDebtNoncurrent |
| Short-term borrowings | at 2013-03-31 | $233.0m | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2013-03-31 | $21.09bn | us-gaap:StockholdersEquity |
| Shares outstanding | at 2013-03-31 | 855,849,302 shares | dei:EntityCommonStockSharesOutstanding |

## Management's discussion and analysis

As filed, 168,471 characters.

(Dollars in millions except per share data, unless otherwise noted)

### EXELON CORPORATION

### General

Exelon, a utility services holding company, operates through the following principal subsidiaries:

- *Generation,* whose integrated business consists of owned, contracted and investments in electric generating facilities managed through customer supply of electric and natural gas products and services, including renewable energy products, risk management services and natural gas exploration and production activities.
- *ComEd,* whose business consists of the purchase and regulated retail sale of electricity and the provision of distribution and transmission services in northern Illinois, including the City of Chicago.
- *PECO,* whose business consists of the purchase and regulated retail sale of electricity and the provision of distribution and transmission services in southeastern Pennsylvania, including the City of Philadelphia, and the purchase and regulated retail sale of natural gas and the provision of distribution services in the Pennsylvania counties surrounding the City of Philadelphia.
- *BGE,* whose business consists of the purchase and regulated retail sale of electricity and the provision of distribution and transmission services in central Maryland, including the City of Baltimore, and the purchase and regulated retail sale of natural gas and the provision of distribution services in central Maryland, including the City of Baltimore.

Exelon has nine reportable segments consisting of Generation’s six power marketing reportable segments (Mid-Atlantic, Midwest, New England, New York, ERCOT and other regions in Generation), ComEd, PECO and BGE. See Note 19 of the Combined Notes to Consolidated Financial Statements for additional information regarding Exelon’s reportable segments.

Through its business services subsidiary BSC, Exelon provides its operating subsidiaries with a variety of support services at cost. The costs of these services are directly charged or allocated to the applicable operating segments. Additionally, the results of Exelon’s corporate operations include costs for corporate governance and interest costs and income from various investment and financing activities.

Exelon’s consolidated financial information includes the results of its four separate operating subsidiary registrants, Generation, ComEd, PECO and BGE, which, along with Exelon, are collectively referred to as the Registrants. The following combined Management’s Discussion and Analysis of Financial Condition and Results of Operations is separately filed by Exelon, Generation, ComEd, PECO and BGE. However, none of the Registrants makes any representation as to information related solely to any of the other Registrants.

### Executive Overview

***Financial Results.*** The following consolidated financial results reflect the results of Exelon for the three months ended March 31, 2013 compared to the same period in 2012. The 2012 financial results only include the operations of Constellation and BGE from the date of the merger with Constellation (the Merger), March 12, 2012, through March 31, 2012. All amounts presented below are before the impact of income taxes, except as noted.

|  | Three Months Ended March 31, 2013 Generation | ComEd | PECO | BGE | Other | Exelon | 2012 Exelon | Favorable (Unfavorable) Variance |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| **Operating revenues** | $3,533 | $1,160 | $895 | $880 | $(386) | $6,082 | $4,690 | $1,392 |
| **Purchased power and fuel** | 2,169 | 382 | 406 | 426 | (402) | 2,981 | 1,765 | (1,216) |
| **Revenue net of purchased power and fuel(a)** | 1,364 | 778 | 489 | 454 | 16 | 3,101 | 2,925 | 176 |
| **Other operating expenses** |  |  |  |  |  |  |  |  |
| Operating and maintenance | 1,112 | 328 | 188 | 143 | (7) | 1,764 | 1,968 | 204 |
| Depreciation and amortization | 214 | 167 | 57 | 93 | 12 | 543 | 382 | (161) |
| Taxes other than income | 93 | 74 | 41 | 55 | 14 | 277 | 194 | (83) |
| Total other operating expenses | 1,419 | 569 | 286 | 291 | 19 | 2,584 | 2,544 | (40) |
| **Equity in losses of unconsolidated affiliates** | (9) | — | — | — | — | (9) | (22) | 13 |
| **Operating income** | (64) | 209 | 203 | 163 | (3) | 508 | 359 | 149 |
| **Other income and (deductions)** |  |  |  |  |  |  |  |  |
| Interest expense, net | (82) | (353) | (29) | (33) | (126) | (623) | (195) | (428) |
| Other, net | 128 | 5 | 3 | 5 | 31 | 172 | 194 | (22) |
| Total other income and (deductions) | 46 | (348) | (26) | (28) | (95) | (451) | (1) | (450) |
| **Income (loss) before income taxes** | (18) | (139) | 177 | 135 | (98) | 57 | 358 | (301) |
| **Income taxes** | (1) | (58) | 55 | 55 | 5 | 56 | 158 | 102 |
| **Net income (loss)** | (17) | (81) | 122 | 80 | (103) | 1 | 200 | (199) |
| Net (loss) income attributable to noncontrolling interests, preferred security dividends and preference stock dividends | 1 | — | 1 | 3 | — | 5 | — | (5) |
| **Net income (loss) on common stock** | $(18) | $(81) | $121 | $77 | $(103) | $(4) | $200 | $(204) |

(a) The Registrants’ evaluate operating performance using the measure of revenue net of purchased power and fuel expense. The Registrants’ believe that revenue net of purchased power and fuel expense is a useful measurement because it provides information that can be used to evaluate its operational performance. Revenue net of purchased power and fuel expense is not a presentation defined under GAAP and may not be comparable to other companies’ presentations or deemed more useful than the GAAP information provided elsewhere in this report.

Exelon’s net income (loss) on common stock was $(4) million for the three months ended March 31, 2013 as compared to net income of $200 million for the three months ended March 31, 2012, and diluted earnings per average common share were $(0.01) for the three months ended March 31, 2013 as compared to $0.28 for the three months ended March 31, 2012.

Operating revenue net of purchased power and fuel expense, which is a non-GAAP measure discussed below, increased by $176 million primarily due to the addition of BGE’s and Constellation’s financial results for the full quarter in 2013. BGE’s operating revenue net of purchased power and fuel expense was $454 million for the three months ended March 31, 2013, compared to a loss of $(16) million from March 12, 2012 through March 31, 2012. Generation’s operating revenue net of purchased power and fuel expense decreased by $335 million primarily due to mark-to-market losses of $403 million in 2013 from economic hedging activities, net of intercompany eliminations, compared to $60 million in mark-to-market gains in 2012. The year-over-year results for Generation are negatively impacted by an increase in amortization expense of $52 million for the acquired energy contracts, net, recorded at fair value at the merger date. Also, revenue net of purchased power and fuel expenses decreased by $100 million in the Midwest primarily due to lower capacity revenues and increased nuclear fuels costs. Offsetting these unfavorable impacts was a net increase of $133 million in revenue net of purchased power and fuel expense in all other regions primarily due to the addition of Constellation’s operations for the full first quarter in 2013. Generation’s results were also favorably affected by $147 million of other activities, including proprietary trading, retail gas, energy efficiency, energy management and demand response, upstream natural gas and the design and construction of customer sited solar facilities.

ComEd’s operating revenues net of purchased power and fuel expense increased by $10 million primarily due to favorable weather conditions and higher electric distribution revenues, partially offset by decreased cost recovery for uncollectible accounts. PECO’s operating revenues net of purchased power and fuel expense increased by $25 million primarily due to favorable weather conditions, partially offset by lower realized prices.

Operating and maintenance expense decreased by $204 million primarily due to certain prior year transactions associated with the Merger. Exelon incurred $216 million in costs as part of the Maryland order approving the Merger and costs of $195 million associated with a settlement with the FERC in March, 2012. Also, Constellation merger and integration costs decreased by $123 million. Decreased operating and maintenance expense was partially offset by increased labor, other benefits, contracting and materials costs of $270 million and increased pension and non-pension postretirement benefit expenses of $16 million, primarily due to the addition of BGE and Constellation for the full quarter in 2013.

Depreciation and amortization expense increased by $161 million primarily due to higher plant balances resulting from the addition of BGE’s and Constellation’s plant balances for the full quarter in 2013, as well as ongoing capital expenditures across the operating companies.

Equity in losses of unconsolidated affiliates decreased by $13 million primarily due to net income generated from Exelon’s equity investment in CENG in 2013 compared to the loss recorded by CENG from March 12, 2012 through March 31, 2012. The loss recorded for this period in 2012 was due to planned nuclear fueling outage days. Partially offsetting this improvement in CENG’s earnings, Generation’s results were also affected by increased amortization of the basis difference in CENG recorded at fair value at the merger.

Interest expense increased by $428 million due to an increase in interest expense at ComEd related to the remeasurement of Exelon’s like-kind exchange tax position in the first quarter of 2013, an increase in debt obligations as a result of the Merger and an increase in debt issued at Generation in June 2012.

Exelon’s effective income tax rates for the three months ended March 31, 2013 and 2012 were 98.2% and 44.1%, respectively. See Note 11 of the Combined Notes to Consolidated Financial Statements for additional information regarding the components of the effective income tax rates.

For further detail regarding the financial results for the three months ended March 31, 2013, including explanation of the non-GAAP measure revenue net of purchased power and fuel expense, see the discussions of Results of Operations by Segment below.

***Adjusted (non-GAAP) Operating Earnings.*** Exelon’s adjusted (non-GAAP) operating earnings for the three months ended March 31, 2013 were $ 602 million, or $ 0.70 per diluted share, compared with adjusted

(non-GAAP) operating earnings of $ 603 million, or $ 0.85 per diluted share, for the same period in 2012. In addition to net income, Exelon evaluates its operating performance using the measure of adjusted (non-GAAP) operating earnings because management believes it represents earnings directly related to the ongoing operations of the business. Adjusted (non-GAAP) operating earnings exclude certain costs, expenses, gains and losses and other specified items. This information is intended to enhance an investor’s overall understanding of year-to-year operating results and provide an indication of Exelon’s baseline operating performance excluding items that are considered by management to be not directly related to the ongoing operations of the business. In addition, this information is among the primary indicators management uses as a basis for evaluating performance, allocating resources, setting incentive compensation targets and planning and forecasting of future periods. Adjusted (non-GAAP) operating earnings is not a presentation defined under GAAP and may not be comparable to other companies’ presentations or deemed more useful than the GAAP information provided elsewhere in this report.

The following table provides a reconciliation between net income as determined in accordance with GAAP and adjusted (non-GAAP) operating earnings for the three months ended March 31, 2013 as compared to the same period in 2012:

*(All amounts after tax: in millions, except per share amounts)*

|  | Three Months Ended March 31, 2013 | Earnings per Diluted Share | 2012 | Earnings per Diluted Share |
| --- | ---: | ---: | ---: | ---: |
| **Net Income (Loss) on Common Stock** | $(4) | $(0.01) | $200 | $0.28 |
| Mark-to-Market Impact of Economic Hedging Activities(a) | 235 | 0.27 | (43) | (0.06) |
| Unrealized Gains Related to NDT Fund Investments(b) | (35) | (0.04) | (36) | (0.05) |
| Plant Retirements & Divestitures(c) | (13) | (0.02) | 6 | 0.01 |
| Constellation Merger and Integration Costs(d) | 27 | 0.03 | 113 | 0.16 |
| Maryland Commitments(e) | — | — | 227 | 0.32 |
| Amortization of Commodity Contract Intangibles(f) | 117 | 0.14 | 78 | 0.11 |
| FERC Settlement(g) | — | — | 172 | 0.25 |
| Non-Cash Remeasurement of Deferred Income Taxes(h) | — | — | (117) | (0.17) |
| Other Acquisition Costs(i) | — | — | 3 | — |
| Amortization of the Fair Value of Certain Debt(j) | (3) | — | — | — |
| Remeasurement of Like-Kind Exchange Tax Position(k) | 265 | 0.31 |  |  |
| Nuclear Uprate Project Cancellation(l) | 13 | 0.02 |  |  |
| **Adjusted (non-GAAP) Operating Earnings** | $602 | $0.70 | $603 | $0.85 |

(a) Reflects the impact of losses (gains) for the three months ended March 31, 2013 and 2012, respectively, on Generation’s economic hedging activities (net of taxes of $150 million and $(28) million, respectively). See Note 9 of the Combined Notes to Consolidated Financial Statements for additional detail related to Generation’s hedging activities.

(b) Reflects the impact of unrealized gains for the three months ended March 31, 2013 and 2012 on Generation’s NDT fund investments for Non-Regulatory Agreement Units (net of taxes of $(68) million and $(83) million, respectively). See Note 12 of the Combined Notes to Consolidated Financial Statements for additional detail related to Generation’s NDT fund investments.

(c) Reflects the impacts associated with the sale or retirement of generating stations for the three months ended March 31, 2013 and 2012 (net of taxes of $5 million and $3 million, respectively). See “Results of Operations — Generation” for additional detail related to the generating station retirements.

(d) Reflects certain costs incurred for the three months ended March 31, 2013 and 2012 (net of taxes of $(6) million and $31 million, respectively) associated with the Constellation merger including transaction costs, employee-related expenses (e.g. severance, retirement, relocation and retention bonuses) integration initiatives and certain pre-acquisition contingencies, partially offset in 2013 by a one-time benefit pursuant to the BGE 2012 electric and gas distribution rate case order for the recovery of previously incurred integration costs. See Note 4 of the Combined Notes to Consolidated Financial Statements for additional information.

(e) Reflects costs incurred for the three months ended March 31, 2012 associated with the Constellation merger (net of taxes of $101 million) as part of the Maryland order approving the merger transaction. See Note 4 of the Combined Notes to Consolidated Financial Statements for additional information.

(f) Reflects the non-cash impact for the three months ended March 31, 2013 and 2012 (net of taxes of $75 million and $51 million, respectively) of the amortization of intangible assets, net, related to commodity contracts recorded at fair value at the merger date. See Note 4 of the Combined Notes to Consolidated Financial Statements for additional information.

(g) Reflects costs incurred for the three months ended March 31, 2012 (net of taxes of $23 million) as part of a settlement with the FERC to resolve a dispute related to Constellation’s pre-merger hedging and risk management transactions. See Note 17 of the Combined Notes to Consolidated Financial Statements for additional information.

(h) Reflects the non-cash impacts of the remeasurement of state deferred income taxes as a result of the merger. See Note 11 of the Combined Notes to Consolidated Financial Statements for additional information.

(i) Reflects certain costs incurred for the three months ended March 31, 2012 (net of taxes of $2 million) associated with various acquisitions.

(j) Reflects the non-cash amortization of certain debt for the three months ended March 31, 2013 (net of taxes of $2 million) recorded at fair value at the Constellation merger date expected to be retired in 2013. See Note 4 of the Combined Notes to Consolidated Financial Statements for additional information.

(k) Reflects a non-cash charge to earnings for the three months ended March 31, 2013 (net of taxes of $104 million) resulting from the first quarter 2013 remeasurement of a like-kind exchange tax position taken on ComEd’s 1999 sale of fossil generating assets. See Note 11 of the Combined Notes to Consolidated Financial Statements for additional information.

(l) Reflects a 2013 charge to earnings for the three months ended March 31, 2013 (net of taxes of $8 million) related to Generation’s cancellation of previously capitalized nuclear uprate projects.

As discussed above, Exelon has incurred and will continue to incur costs associated with the Constellation merger including, meeting the various commitments set forth by regulators and agreed-upon with other interested parties as part of the merger approval process, and integrating the former Constellation businesses into Exelon.

For the three months ended March 31, 2013 and 2012, expense has been recognized for costs incurred to achieve the merger as follows:

| Merger and Integration Costs: | Pre-tax Expense Three Months Ended March 31, 2013 Generation(a) | ComEd | PECO | BGE(a) | Exelon(a) |
| --- | ---: | ---: | ---: | ---: | ---: |
| Employee-Related(b) | 6 | — | 1 | — | 7 |
| Other(c) | 17 | — | 2 | (6 )(d) | 14 |
| Total | $23 | $— | $3 | $(6) | $21 |
|  | **Pre-tax Expense** |  |  |  |  |
|  | **Three Months Ended March 31, 2012** |  |  |  |  |
| **Merger and Integration Costs:** | **Generation(a)** | **ComEd** | **PECO** | **BGE(a)** | **Exelon(a)** |
| Transaction(e) | $— | $— | $— | $— | $50 |
| Maryland Commitments | 35 | — | — | 139 | 328 |
| Employee-Related(b) | 47 | — | 5 | — | 58 |
| Other(c) | 28 | 2 | 2 | 1 | 36 |
| Total | $110 | $2 | $7 | $140 | $472 |

(a) For Exelon, Generation and BGE, includes the operations of the acquired businesses for the three months ended March 31, 2013 and from the date of the merger, March 12, 2012, through March 31, 2012.

(b) Costs primarily for employee severance, pension and OPEB expense and retention bonuses. ComEd established regulatory assets of $1 million and $12 million during the three months ended March 31, 2013 and March 31, 2012, respectively. For ComEd, the majority of these costs are expected to be recovered over a five-year period. BGE established a regulatory asset of $16 million during the three months ended March 31, 2012, and the majority of these costs will be recovered over a five-year period. These costs are not included in the table above.

(c) Costs to integrate Constellation processes and systems into Exelon and to terminate certain Constellation debt agreements. ComEd established a regulatory asset of $3 million and $4 million during the three months ended March 31, 2013 and 2012, respectively, for certain other merger and integration costs, which are not included in the table above. BGE established a regulatory asset of $2 million during the three months ended March 31, 2013 for certain other merger integration costs, which are not included in the table above.

(d) BGE established a regulatory asset of $6 million at March 31, 2013 for certain 2012 other merger integration costs as part of the 2013 electric and gas distribution rate case order.

(e) External, third-party costs paid to advisors, consultants, lawyers and other experts to assist in the due diligence and regulatory approval processes and in the closing of the transaction.

As of March 31, 2013, Exelon projects incurring total additional merger-related expenses, primarily in 2013, of approximately $165 million.

Pursuant to the conditions set forth by the MDPSC in its approval of the merger transaction, Exelon committed to provide a package of benefits to BGE customers, and make certain investments in the City of Baltimore and the State of Maryland, resulting in an estimated direct investment in the State of Maryland of more than $1 billion. The direct investment estimate includes $95 million to $120 million for the requirement to cause construction of a headquarters building in Baltimore for Generation’s competitive energy businesses. On March 20, 2013, Generation signed a twenty year lease agreement that is contingent upon the developer obtaining financing for the construction of the building. Once the financing conditions are met, construction of the building will commence and is expected to be ready for occupancy in 2 years. The direct investment estimate also includes $625 million in expenditures relating to the development of 285-300 MW of new electric generation facilities in Maryland (expected to be completed over the next ten years).

### Exelon’s Strategy and Outlook for the remainder of 2013 and Beyond

Exelon’s value proposition and competitive advantage come from its scope and scale across the energy value chain and its core strengths of operational excellence and financial discipline.

On March 12, 2012, the Exelon and Constellation merger was completed. The merger creates incremental strategic value by matching Exelon’s clean generation fleet with Constellation’s leading customer-facing platform, as well as creating economies of scale through expansion across the energy value chain. Exelon supports customer switching to alternative electric generation suppliers and the addition of Constellation’s competitive retail operations provides another outlet for Exelon to grow its business in competitive markets.

Generation is managed as an integrated business and is located in multiple geographic regions, with multiple supply sources and provides various energy commodities through multiple distribution channels. Generation’s nuclear, fossil fuel, hydroelectric and renewables strategy is to pursue opportunities that provide generation to load matching and that diversify the generation fleet by expanding its regional and technological footprint. Generation’s customer-facing activities enhance and expand across states its existing customer platform, and develop innovative products for its customers.

Exelon’s utility strategy is to improve reliability and operations and enhance the customer experience, while ensuring ratemaking mechanisms provide the utilities fair financial returns. Exelon seeks to leverage its scale and expertise across the utilities platform by standardization and sharing of best practices to achieve improved operational and financial results.

Exelon’s financial priorities are to maintain investment grade credit metrics at each of Exelon, Generation, ComEd, PECO and BGE, and to return value to Exelon’s shareholders with a sustainable dividend throughout the energy commodity market cycle and through earnings growth from attractive investment opportunities.

In pursuing its strategies, Exelon has exposure to various market and financial risks, including the risk of price fluctuations in the power markets. Power prices are a function of supply and demand, which in turn are driven by factors such as (1) the price of fuels, in particular, the prices of natural gas and coal, which drive the market prices that Generation’s power plants can obtain for their output, (2) the rate of expansion of subsidized low carbon generation in the markets in which Generation’s output is sold, (3) the effects on energy demand of factors such as weather, economic conditions and implementation of energy efficiency and demand response programs, and (4) the impacts of increased competition in the retail channel.

### Power Markets

***Price of Fuels.*** The use of new technologies to recover natural gas from shale deposits is increasing natural gas supply and reserves, which places downward pressure on natural gas prices and, therefore, on wholesale and retail power prices, which results in a reduction in Exelon’s revenues. Since the third quarter of 2011, forward natural gas prices for 2013 and 2014 have declined significantly; in part reflecting an increase in supply due to strong natural gas production (due to shale gas development).

***Subsidized Generation.*** The rate of expansion of subsidized low carbon generation such as wind and solar energy in the markets in which Generation’s output is sold can negatively impact wholesale power prices, and in turn, Generation’s results of operations.

Various states have implemented or proposed legislation, regulations or other policies to subsidize new generation development which may result in artificially depressed wholesale energy and capacity prices. For example, on April 12, 2012, the MDPSC issued an order directing the Maryland electric utilities to enter into a 20-year contract for differences (CfD) with CPV Maryland, LLC (CPV), under which CPV will construct an approximately 700 MW combined cycle gas turbine in Waldorf, Maryland, that it projected will be in commercial operation by June 1, 2015. The CfD mandates that utilities (including BGE) pay (or receive) the difference between CPV’s contract price and the revenues it receives for capacity and energy from clearing the unit in the PJM capacity market.

Similarly, in January 2011, New Jersey passed legislation that provides guaranteed cost recovery through a CfD for the development of up to 2,000 MWs of new base load or mid-merit generation, so long as it clears in PJM’s capacity market. Three generation developers were chosen for the New Jersey CfD, for which contracts were executed in 2011 by the state’s utilities under protest. Similarly, in Illinois, legislation has been debated for over four years that passed in the Senate and is currently being considered in the House which would require consumers to subsidize the development of an Integrated Gasification Combined Cycle plant by purchasing its electricity through 30 year power purchase agreements at prices significantly above market prices. A new version was recently introduced in the current Illinois General Assembly but its prospects are unclear at this time.

Exelon and others filed a complaint in federal district court challenging the constitutionality and other aspects of the New Jersey legislation. Similarly, Exelon and others are also challenging the selection of the three generation developers in New Jersey state court proceedings and the MDPSC actions in Maryland state court.

As required under their CfDs, two of the New Jersey generator developers and one in Maryland offered and cleared in PJM’s capacity market auction held in May 2012. Given the state-required customer subsidy provided under their respective CfDs, Exelon believes that these projects may have artificially suppressed capacity prices in PJM in this auction and may continue to do so in future auctions to the detriment of Exelon’s market driven position. PJM’s capacity market rules include a Minimum Offer Pricing Rule (MOPR) that is intended to preclude sellers from artificially suppressing the competitive price signals for generation capacity. However, Exelon does not believe that the existing MOPR worked effectively with respect to the abovementioned generator developers. Accordingly, Exelon worked with other market stakeholders, PJM and PJM’s independent market monitor to develop a new MOPR that would more effectively preclude such artificial price suppression, and PJM, after extensive stakeholder consideration, filed its new MOPR seeking FERC approval in December, 2012. On February 5, 2013, FERC issued a letter finding that PJM’s new MOPR filing is deficient and requested PJM provide additional information on several aspects of PJM’s MOPR proposal. In early March 2013, PJM filed the additional information requested by the FERC. On May 3, 2013, the FERC issued its order. While the

FERC order accepted certain aspects of the proposal that Exelon supported (such as applying the MOPR to all of PJM and not just certain zones within PJM), the FERC required PJM to retain a key element of its previous MOPR structure, the unit-specific exemption, an element that Exelon had supported removing. Exelon is currently considering its options with respect to this proceeding. See Note 5 of the Combined Notes to Consolidated Financial Statements for further details of PJM’s MOPR.

A continuation of these state efforts, if successful and unabated by an effective MOPR, could continue to result in artificially depressed wholesale capacity and/or energy prices. Other states could seek to establish similar programs, which could substantially impair Exelon’s market driven position and could have a material effect on Exelon’s financial results of operations, financial position and cash flows.

***Energy Demand.*** The continued tepid economic environment and growing energy efficiency initiatives have limited the demand for electricity across the Exelon utilities. ComEd is projecting load volumes to remain essentially flat in 2013 compared to 2012, while PECO and BGE are projecting an increase (decrease) of 0.5% and (1.1%), respectively, in 2013 compared to 2012. The projected increase at PECO is a result of the oil refineries returning to full production and improved employment outlook in its service territory offset by the continued energy efficiency initiatives and the additional day in 2012 for the leap year. The projected decline at BGE is a result of the idling of a significant customer, energy efficiency initiatives and the additional day in 2012 for the leap year, partially offset by improving economic conditions. See Note 5 of the Combined Notes to Consolidated Financial Statements for further discussion of energy efficiency and demand response programs.

***Retail Competition.*** Generation’s retail operations compete for customers in a competitive environment, which affect the margins that Generation can earn and the volumes that it is able to serve. Recently, sustained low forward natural gas and power prices and low market volatility have caused retail competitors to aggressively pursue market share, and wholesale generators (including Generation) to use their retail operations to hedge generation output. These factors have adversely affected overall gross margins and profitability in Generation’s retail operations.

### Strategic Policy Alignment

Exelon routinely reviews its hedging policy, dividend policies, operating and capital costs, capital spending plans, strength of its balance sheet and credit metrics, and sufficiency of its liquidity position, by performing various stress tests with differing variables, such as commodity price movements, increases in margin-related transactions, changes in hedging practices, and the impacts of hypothetical credit downgrades.

Exelon’s Board of Directors declared the first quarter 2013 dividend of $0.525 per share, and in response to low forward energy prices and weaker financial expectations, among other factors, Exelon’s Board of Directors approved a revised dividend policy going forward. The first quarter dividend was paid on March 8, 2013 to shareholders of record on February 19, 2013 and was based on Exelon’s previous dividend of $2.10 per share on an annualized basis. The second quarter dividend will be based on Exelon’s new dividend policy of $0.31 per share quarterly dividend ($1.24 per share on an annualized basis). Consistent with past practice, all future quarterly dividends will require approval by Exelon’s Board of Directors.

Continuation of recent power price volatility and demand trends could adversely affect the Registrants’ ability to fund discretionary uses of cash such as growth projects and dividends. In addition, economic conditions may no longer support the continued operation of certain generating facilities, which could adversely affect Generation’s results of operations through increased depreciation rates, impairment charges and accelerated future decommissioning costs.

### Hedging Strategy

Exelon’s policy to hedge commodity risk on a ratable basis over three-year periods is intended to reduce the financial impact of market price volatility. Generation is exposed to commodity price risk associated with the unhedged portion of its electricity portfolio. Generation enters into non-derivative and derivative contracts, including financially settled swaps, futures contracts and swap options, and physical options and physical forward contracts, all with credit-approved counterparties, to hedge this anticipated exposure. Generation has hedges in place that significantly mitigate this risk for 2013 and 2014. However, Generation is exposed to relatively greater commodity price risk in the subsequent years with respect to which a larger portion of its electricity portfolio is currently unhedged. As of March 31, 2013, the percentage of expected generation hedged for the major reportable segments was 98%-101%, 70%-73% and 33%-36% for 2013, 2014, and 2015, respectively. The percentage of expected generation hedged is the amount of equivalent sales divided by the expected generation. Expected generation represents the amount of energy estimated to be generated or purchased through owned or contracted capacity. Equivalent sales represent all hedging products, which include economic hedges and certain non-derivative contracts, including Generation’s sales of energy to ComEd, PECO and BGE relating to their respective retail load obligations. Generation has been and will continue to be proactive in using hedging strategies to mitigate commodity price risk in subsequent years as well.

Generation procures coal, oil and natural gas through long-term and short-term contracts and spot-market purchases. Nuclear fuel is obtained predominantly through long-term uranium concentrate supply contracts, contracted conversion services, contracted enrichment services and contracted fuel fabrication services. The supply markets for uranium concentrates and certain nuclear fuel services, coal, oil and natural gas are subject to price fluctuations and availability restrictions. Supply market conditions may make Generation’s procurement contracts subject to credit risk related to the potential non-performance of counterparties to deliver the contracted commodity or service at the contracted prices. Approximately 60% of Generation’s uranium concentrate requirements from 2013 through 2017 are supplied by three producers. In the event of non-performance by these or other suppliers, Generation believes that replacement uranium concentrates can be obtained, although at prices that may be unfavorable when compared to the prices under the current supply agreements. Non-performance by these counterparties could have a material adverse impact on Exelon’s and Generation’s results of operations, cash flows and financial position. ComEd, PECO and BGE mitigate such exposure through regulatory mechanisms that allow them to recover procurement costs from retail customers.

### New Growth Opportunities

***Nuclear Uprate Program.*** Generation is engaged in individual projects as part of a planned power uprate program across its nuclear fleet. Using proven technologies, the projects take advantage of new production and measurement technologies, new materials and application of expertise gained from a half-century of nuclear power operations. The uprates are being undertaken pursuant to an organized, strategically sequenced implementation plan. The implementation effort includes a periodic review and refinement of the plan in light of changing market conditions. Decisions to implement uprates at particular nuclear plants, the amount of expenditures to implement the plan, and the actual MWs of additional capacity attributable to the uprate program will be determined on a project-by-project basis in accordance with Exelon’s normal project evaluation standards and ultimately will depend on market conditions, economic and policy considerations, and other factors.

Based on recent reviews, the nuclear uprate implementation plan was adjusted during 2013 to cancel certain projects, as a result of the cost of additional plant modifications identified during final design work which combined with current market conditions, including low natural gas prices and the continued sluggish economy, made these projects not economically viable. For these cancelled projects, Generation recorded approximately $21 million of operating and maintenance expense during the first quarter of 2013 to reverse the previously capitalized costs. In addition, the ability to implement several projects requires the successful resolution of various technical matters. The resolution of these matters may further affect the timing and amount of the power increases associated with the power uprate initiative. Following these reviews, any projects that may be undertaken are expected to be completed by the end of 2021, and may result in between 1,075 and 1,125 MWs of additional capacity at an overnight cost of approximately $3.3 billion in 2013 dollars. Overnight costs do not include financing costs or cost escalation.

Approximately 75% of the planned uprate MWs projects are either complete and in service or in the installation or design and engineering phases across seven nuclear stations including Limerick and Peach Bottom in Pennsylvania and Byron, Braidwood, Dresden, LaSalle and Quad Cities in Illinois. The remaining 25% of uprate MWs, if and when completed, would come from an extended power uprate project at Limerick currently scheduled to begin in 2017. From the program announcement in 2008 through March 31, 2013, Generation has placed in service 310 MWs of nuclear generation through the uprate program at a cost of approximately $855 million, which has been capitalized to property, plant and equipment on Exelon’s and Generation’s consolidated balance sheets. At March 31, 2013, an additional approximate $270 million has been capitalized to construction work in progress (CWIP) within property, plant and equipment on Exelon’s and Generation’s consolidated balance sheets, of which approximately $170 million (202 MWs) relates to projects currently in the installation phase. The remaining $100 million (300 MWs) in CWIP relates to projects currently in the design and engineering phase that continue to be evaluated in accordance with Exelon’s normal project evaluation standards. The completion of those projects in the design and engineering phase will ultimately depend on market conditions, economic and policy considerations, and other factors. As of March 31, 2013, Generation believes it is more likely than not that all projects in CWIP will ultimately be placed in service. If a project in the design and engineering phase is expected to not be completed as planned, previously capitalized costs would be reversed through earnings as a charge to operating and maintenance expense.

***Generation Renewable Development.*** On September 30, 2011, Exelon announced the completion of its acquisition of all of the interests in Antelope Valley, a 230-MW solar photovoltaic (PV) project under development in northern Los Angeles County, California, from First Solar, Inc., which developed and will build, operate, and maintain the project. The first portion of the project began operations in December 2012, with three additional blocks coming online in the first quarter of 2013 and an expectation of full commercial operation in December 2013. The acquisition supports the Exelon commitment to renewable energy as part of Exelon 2020. The project has a 25-year PPA, approved by the CPUC, with Pacific Gas & Electric Company for the full output of the plant. Upon completion, the facility will add 230 MWs to Generation’s renewable generation fleet. Total capitalized costs for the facility are expected to be approximately $1.1 billion. Total capitalized costs incurred through March 31, 2013 were approximately $840 million. Additionally, Generation constructed and placed into service six wind facilities in 2012, resulting in approximately 400 MWs of additional renewable generation. Total costs for the facilities were approximately $700 million.

### Smart Meter and Smart Grid Initiatives.

*ComEd’s Smart Meter and Smart Grid Investments.* On December 5, 2012, the ICC approved ComEd’s revised AMI Deployment Plan which includes the planned installation of 4 million electric smart meters. ComEd plans to invest approximately $1.3 billion on smart meters and smart grid under EIMA, including $1.0 billion through the AMI Deployment Plan.

*PECO’s Smart Meter and Smart Grid Investments.* In 2010, the PAPUC approved PECO’s Smart Meter Procurement and Installation Plan, under which PECO will install more than 1.6 million smart meters. PECO plans to spend up to a total of $595 million and $120 million on its smart meter and smart grid infrastructure, respectively, before considering the $200 million SGIG.

*BGE Smart Grid Initiative.* In August 2010, the MDPSC approved a comprehensive smart grid initiative for BGE which includes the planned installation of 2 million electric and gas smart meters at an expected total cost of approximately $480 million, before considering the $200 million SGIG for smart grid and other related initiatives.

See Note 5 of the Combined Notes to Consolidated Financial Statements for additional information on the Smart Meter and Smart Grid Initiatives.

### Liquidity

Each of the Registrants annually evaluates its financing plan, dividend practices and credit line sizing, focusing on maintaining its investment grade ratings while meeting its cash needs to fund capital requirements, retire debt, pay dividends, fund pension and other postretirement benefit obligations and invest in new and existing ventures. The Registrants expect cash flows to be sufficient to meet operating expenses, financing costs and capital expenditure requirements.

Exelon, Generation, ComEd, PECO and BGE have unsecured syndicated revolving credit facilities with aggregate bank commitments of $0.5 billion, $5.3 billion, $1.0 billion, $0.6 billion and $0.6 billion, respectively. Generation also has bilateral credit facilities with aggregate maximum availability of $0.4 billion.

***Exposure to Worldwide Financial Markets.*** Exelon has exposure to worldwide financial markets. The ongoing European debt crisis has contributed to the instability in global credit markets. Further disruptions in the European markets could reduce or restrict the Registrants’ ability to secure sufficient liquidity or secure liquidity at reasonable terms. As of March 31, 2013, approximately 30%, or $2.5 billion, of the Registrants’ aggregate total commitments were with European banks. The credit facilities include $8.4 billion in aggregate total commitments of which $6.7 billion was available as of March 31, 2013. There were no borrowings under the Registrants’ credit facilities as of March 31, 2013. See Note 10 of the Combined Notes to the Consolidated Financial Statements for additional information on the credit facilities.

### Tax Matters

Exelon has exposure related to various uncertain tax positions which Exelon manages through planning and implementation of tax planning strategies. See Note 11 of the Combined Notes to Consolidated Financial Statements for additional information.

### Environmental Legislative and Regulatory Developments.

Exelon supports the promulgation of certain environmental regulations by the U.S. EPA, including air, water and waste controls for electric generating units. See discussion below for further details. The air and waste regulations will have a disproportionate adverse impact on fossil-fuel power plants, requiring significant expenditures of capital and variable operating and maintenance expense, and will likely result in the retirement of older, marginal facilities. Due to their low emission generation portfolio, Generation and CENG will not be significantly directly affected by these regulations, representing a competitive advantage relative to electric generators that are more reliant on fossil-fuel plants. Various bills have been introduced in the U.S. Congress that would prohibit or impede the U.S. EPA’s rulemaking efforts. The timing of the consideration of such legislation is unknown.

*Air Quality.* In recent years, the U.S. EPA has been implementing a series of increasingly stringent regulations under the Clean Air Act relating to NAAQS for conventional air pollutants (e.g., NOx, SO2 and particulate matter) as well as stricter technology requirements to control HAPs (e.g., acid gases, mercury and other heavy metals) from electric generation units. The U.S. EPA continues to review and update its NAAQS with a tightened particulate matter NAAQS issued in December 2012 and a review of the current 2008 ozone NAAQS that is expected to result in a final revised ozone NAAQS sometime in 2014. These updates will potentially result in more stringent emissions limits on fossil-fuel electric generating stations. There continues to be opposition among fossil-fuel generation owners to the potential stringency and timing of these air regulations.

In July 2011, the U.S. EPA published CSAPR and in June 2012, it issued final technical corrections. CSAPR required 28 upwind states in the eastern half of the United States to significantly improve air quality by reducing power plant emissions that cross state lines and contribute to ground-level ozone and fine particle pollution in downwind states. On August 21, 2012, a three-judge panel of the D.C. Circuit Court held that the U.S. EPA had exceeded its authority in certain material aspects with respect to CSAPR and vacated the rule and remanded it to the U.S. EPA for further rulemaking consistent with its decision. The Court also ordered that CAIR remain in effect pending finalization of CSAPR on remand. Until the U.S. EPA re-issues CSAPR, Exelon cannot determine the impacts of the rule, including any that would impact power prices. In March 2013, the U.S. EPA petitioned the U.S. Supreme Court to review the D.C. Circuit Court’s CSAPR decision, and Exelon has filed in support of the U.S. EPA’s petition.

On December 16, 2011, the U.S. EPA signed a final rule to reduce emissions of toxic air pollutants from power plants and signed revisions to the NSPS for electric generating units. The final rule, known as MATS, requires coal-fired electric generation plants to achieve high removal rates of mercury, acid gases and other metals. To achieve these standards, coal units with no pollution control equipment installed (uncontrolled coal units) will have to make capital investments and incur higher operating expenses. It is expected that owners of smaller, older, uncontrolled coal units will retire the units rather than make these investments. Coal units with existing controls that do not meet the MATS rule may need to upgrade existing controls or add new controls to comply. Owners of oil units not currently meeting the proposed emission standards may choose to convert the units to light oils or natural gas, install control technologies, or retire the units. Numerous entities have challenged MATS in the D.C. Circuit Court, and Exelon has been granted permission by the Court to intervene in support of the rule. A decision by the Court is expected sometime in 2013. The outcome of the appeal, and its impact on power plant operators’ investment and retirement decisions, is uncertain.

The cumulative impact of these air regulations could be to require power plant operators to expend significant capital to install pollution control technologies, including wet flue gas desulfurization technology for SO2 and acid gases, and selective catalytic reduction technology for NOx. Exelon, along with the other co-owners of Conemaugh Generating Station are moving forward with plans to improve the existing scrubbers and install Selective Catalytic Reduction (SCR) controls to meet the mercury removal requirements of MATS by January 1, 2015. In addition, Keystone already has SCR and Flue-gas desulfurization (FGD) controls in place.

On January 15, 2013, EPA issued a final rule for New Source Performance Standards (NSPS) and National Emissions Standards for Hazardous Air Pollutants (NESHAP) for reciprocating internal combustion engines (RICE NESHAP/NSPS). The final rule allows diesel backup generators to operate for up to 100 hours annually under certain emergency circumstances without meeting emissions limitations, but requires units that operate over 15 hours to burn low sulfur fuel and report key engine information. The final rule eliminates after May 2014 the 50 hour exemption for peak shaving and other non-emergency demand response that was included in the proposed rule, and therefore, is not expected to result in additional megawatts of demand response to be bid into the PJM capacity auction.

In the absence of Federal legislation, the U.S. EPA is also moving forward with the regulation of GHG emissions under the Clean Air Act, including permitting requirements under the Prevention of Significant Deterioration (PSD) and Title V operating permit sections of the Clean Air Act for new and modified stationary sources that became effective January 2, 2011. On April 13, 2012, the U.S. EPA published proposed regulations for NSPS for GHG emissions from new fossil-fueled power plants greater than 25 MW that would require the plants to limit CO2 emissions. Under the PSD regulations, new and modified major stationary sources could be required to install best available control technology, to be determined on a case-by-case basis. The U.S. EPA is also expected to establish in 2013 GHG emission regulations for existing stationary sources under Section 111(d) of the Clean Air Act. It is not yet known what the nature and impact of the final regulations will be.

Exelon supports comprehensive climate change legislation or regulation, including a cap-and-trade program for GHG emissions, which balances the need to protect consumers, business and the economy with the urgent need to reduce national GHG emissions.

*Water Quality.* Section 316(b) of the Clean Water Act requires that cooling water intake structures at electric power plants reflect the best technology available to minimize adverse environmental impacts, and is implemented through state-level NPDES permit programs. On March 28, 2011, the U.S. EPA issued a proposed rule, and is required under a Settlement Agreement to issue a final rule by July 27, 2013. The proposed rule does not require closed cycle cooling (e.g., cooling towers) as the best technology available, and also provides some flexibility in the use of cost-benefit considerations and site-specific factors. The proposed rule affords the state permitting agency wide discretion to determine the best technology available, which, depending on the site characteristics, could include closed cycle cooling, advanced screen technology at the intake, or retention of the current technology.

It is unknown at this time whether the final regulations will require closed-cycle cooling. The economic viability of Generation’s facilities without closed-cycle cooling water systems will be called into question by any requirement to construct cooling towers. Should the final rule not require the installation of cooling towers, and retain the flexibility afforded the state permitting agencies in applying a cost – benefit test and to consider site-specific factors, the impact of the rule would be minimized even though the costs of compliance could be material to Generation.

*Hazardous and Solid Waste.* Under proposed U.S. EPA rules issued on June 21, 2010, coal combustion residuals (CCR) would be regulated for the first time under the RCRA. The U.S. EPA is considering several options, including classification of CCR either as a hazardous or non-hazardous waste, under RCRA. Under either option, the U.S. EPA’s intention is the ultimate elimination of surface impoundments as a waste treatment process. For plants affected by the proposed rules, this would result in significant capital expenditures and variable operating and maintenance expenditures to convert to dry handling and disposal systems and installation of new waste water treatment facilities. Generation’s plants that would be affected by the proposed rules are Keystone and Conemaugh in Pennsylvania, which have on-site landfills that meet the requirements of Pennsylvania solid waste regulations for non-hazardous waste disposal. However, until the final rule is adopted, the impact on these facilities is unknown. The U.S. EPA has not announced a target date for finalization of the CCR rules.

See Note 17 of the Combined Notes to Consolidated Financial Statements for further detail related to environmental matters, including the impact of environmental regulation.

### Other Regulatory and Legislative Actions

***Japan Earthquake and Tsunami and the Nuclear Industry’s Response.*** On March 11, 2011, Japan experienced a 9.0 magnitude earthquake and ensuing tsunami that seriously damaged the nuclear units at the Fukushima Daiichi Nuclear Power Station, which are operated by Tokyo Electric Power Co.

Generation believes its nuclear generating facilities do not have the same operating risks as the Fukushima Daiichi plant because they meet the NRC’s requirement that specifies all plants must be able to withstand the most severe natural phenomena historically reported for each plant’s surrounding area, with a significant margin for uncertainty. In addition, Generation’s plants are not located in significant earthquake zones or in regions where tsunamis are a threat. Generation believes its nuclear generating facilities are able to shut down safely and keep the fuel cooled through multiple redundant systems specifically designed to maintain electric power when electricity is lost from the grid. Further, Generation’s nuclear generating facilities also undergo frequent scenario drills to ensure the proper function of the redundant safety protocols.

Since the events in Japan took place, Generation has continued to work with regulators and nuclear industry organizations to understand the events in Japan and apply lessons learned. Early on, the nuclear industry took a number of specific steps to respond, including actions requested by the Institute of Nuclear Power Operations (INPO) to perform tests that verified Generation’s emergency equipment is available and functional, conduct walk-downs on its procedures related to critical safety equipment, confirm event response procedures and readiness to protect the spent fuel pool, and verify current qualifications of operators and support staff needed to implement the procedures. Generation has been addressing additional actions requested by INPO for improving and maintaining core and spent fuel pool cooling during an extended loss of power for at least 24 hours.

In April 2011, the NRC named six senior managers and staff to its task force for examining the agency’s regulatory requirements, programs, processes, and implementation in light of information from the Fukushima Daiichi site in Japan, following the March 11 earthquake and tsunami (Task Force). On July 12, 2011, the NRC Task Force issued a report of its review of the accident, including recommendations for future regulatory action by the NRC to be taken in the near and longer term. The Task Force’s report concluded that nuclear reactors in the United States are operating safely and do not present an imminent risk to public health and safety. The Task

Force’s report did not recommend any changes to the existing nuclear licensing process in the United States or changes in the storage of spent nuclear fuel within the plant’s spent nuclear fuel pools. During the fourth quarter of 2011, the NRC staff issued its recommendations for prioritizing and implementing the Task Force recommendations and an implementation schedule which was approved by the NRC subject to a number of conditions. The NRC staff confirmed the Task Force’s conclusions that none of the findings arising from the Task Force review presented an imminent risk to public health and safety.

In March 2012, the NRC authorized its staff to issue three immediately effective orders to commercial reactor licensees operating in the United States for compliance no later than December 31, 2016. In summary, the orders require licensees: (1) to provide sufficient onsite portable equipment and resources to maintain or restore cooling capabilities for the containment, core, and spent fuel pool until offsite equipment is available and have offsite equipment and resources available to sustain cooling functions indefinitely; (2) to improve the venting systems with boiling water reactor Mark I or Mark II containments (or for the Mark II plants, install new systems) that help prevent or mitigate core damage in the event of a serious accident by making the systems accessible and operable in the event of a prolonged station blackout and inadequate cooling; and (3) to install instrumentation to provide a reliable indication of water level in the spent fuel pool.

Additionally, the NRC has issued a detailed information request to every operating commercial nuclear power plant in the United States. The information requested requires: (1) use of the current NRC guidance to reevaluate current seismic and flood risk hazards against the design basis and provide a plan of actions to address vulnerabilities, including risks exceeding the design basis; (2) performance of walk downs to ensure the ability to respond to seismic and external flooding events and provide a corrective action plan to the NRC to address deficiencies; and (3) assessment of the means to provide power for communications equipment during a severe natural event and identify staffing required to implement the emergency plan for an event affecting all units with an extended loss of alternating current power and impeded access to the site. In November 2012, the NRC staff recommended to the NRC the installation of engineered containment filtered venting systems for boiling-water reactors with Mark I and Mark II containment structures. On March 19, 2013, the NRC issued a Staff Requirements Memorandum (SRM) related to venting requirements for boiling water reactor Mark I or Mark II containments. In the SRM, the Commissioners call for the NRC staff to (1) issue an enhancement to the March 2012 order within 60 days to require vents to remain functional during severe accident conditions, and (2) produce a technical evaluation to support rulemaking that considers filtering and performance-based strategies as options. The NRC staff must then develop a final rule by March 2017.

Generation has assessed the impacts of the orders and information requests and will continue monitoring the additional recommendations under review by the staff, both from an operational and a financial impact standpoint. A comprehensive review of the NRC Tier 1 orders and information requests, as well as preliminary engineering assumptions and analysis, indicate that the financial impact of compliance is expected to be approximately $350 million and $50 million of capital and operating expense, respectively, from 2013 through 2017, as previously anticipated in Generation’s planning projections. In addition, Generation estimates incremental costs of $15 to $20 million per unit at eleven Mark I and II units for the installation of filtered vents, if ultimately required by the NRC. Generation’s current assessments are specific to the Tier 1 recommendations as the NRC has not taken specific action with respect to the Tier 2 and Tier 3 recommendations. Exelon and Generation are unable to conclude at this time to what extent any actions to comply with the requirements of Tier 2 and Tier 3 will impact their future financial position, results of operations, and cash flows. Generation will continue to engage in nuclear industry assessments and actions and stakeholder input. See Item 1A. Risk Factors of the Exelon 2012 Form 10-K, for further discussion of the risk factors.

Generation will continue to monitor NRC directives and guidance that may impact the uprates and, as it has in the past, evaluate each project at the appropriate time and cancel or defer any uprate project that is not considered economical, whether due to energy prices, potential increased regulation, or other factors.

***Financial Reform Legislation.*** The Dodd-Frank Wall Street Reform and Consumer Protection Act (Dodd-Frank Act) was enacted in July 2010. While the Dodd-Frank Act is focused primarily on the regulation and oversight of financial institutions, it also provides for a new regulatory regime for over-the-counter swaps (Swaps), including mandatory clearing, exchange trading, margin requirements, and other transparency requirements. The Dodd-Frank Act, however, also preserves the ability of end users in the energy industry to hedge their risks. In April 2012, the CFTC issued its rule defining swap dealers and major swap participants. Exelon has determined that it will conduct its commercial business in a manner that does not require registration as a swap dealer or major swap participant. Notwithstanding, there are additional rulemakings that have not yet been issued, including the capital and margin rules, which will further define the scope of the regulations and provide clarity as to the impact on the Registrants’ business, as well as to potential new opportunities. Depending on these final rules, the Registrants could be subject to significant new obligations.

The proposed regulations addressing collateral and capital requirements and exchange margin cash postings, when final, could require Generation to increase collateral requirements or cash postings in lieu of letters of credit currently issued to collateralize Swaps. Exelon had previously estimated that it could be required to make up to $1 billion of additional collateral postings under its bilateral credit lines. Given the swap dealer and the major swap participant definitions will not apply to Generation, the actual amount of collateral postings that will be required may be lower than Exelon’s previous expectations due to the following factors: (a) the majority of Generation’s physical wholesale portfolio does not meet the final CFTC Swap definition; (b) there will be minimal incremental costs associated with Generation’s positions that are currently cleared and subject to exchange margin; and (c) Generation will not be a swap dealer or major swap participant and proposed capital requirements applicable to these entities will not apply to Generation.

The actual level of collateral required will depend on many factors, including but not limited to market conditions, the outcome of final margin rules for Swaps, the extent of its trading activity in Swaps, and Generation’s credit ratings. Nonetheless, Generation has adequate credit facilities and flexibility in its hedging program to meet its anticipated collateral requirements estimated based on conservative assumptions.

In addition, the new regulations will impose new and ongoing compliance and infrastructure costs on Generation, which may amount to several million dollars per year.

Exelon and Generation continue to monitor the rulemaking procedures and cannot predict the ultimate outcome that the financial reform legislation will have on their results of operations, cash flows or financial position.

ComEd, PECO and BGE could also be subject to various Dodd-Frank Act requirements to the extent they enter into Swap transactions. However, at this time, management of ComEd, PECO and BGE do not expect to be materially affected by this legislation.

***Energy Infrastructure Modernization Act.*** Since 2011, ComEd’s distribution rates are established through a performance-based rate formula, pursuant to EIMA. EIMA also provides a structure for substantial capital investment by utilities over a ten-year period to modernize Illinois’ electric utility infrastructure. In addition, as long as ComEd is subject to EIMA, ComEd will fund customer assistance programs for low-income customers, which amounts will not be recoverable through rates.

ComEd files an annual reconciliation of the revenue requirement in effect in a given year to reflect the actual costs that the ICC determines are prudently and reasonably incurred for such year. Under the terms of EIMA, ComEd’s target rate of return on common equity is subject to reduction if ComEd does not deliver the reliability and customer service benefits, as defined, it has committed to over the ten-year life of the investment program.

During March 2013, the Illinois House and Senate each passed Senate Bill 9 with supermajority votes to clarify the intent of EIMA on three major issues: average vs. year-end rate base ad capital structure, return on pension asset, and a weighted average cost of capital interest rate on the prior year reconciliation. If the legislation is enacted, ComEd projects that Senate Bill 9 would result in increased operating revenues of approximately $25 million and $65 million in 2013 and 2014, respectively. Also, if the legislation is enacted, ComEd projects that Senate Bill 9 would accelerate capital expenditures by approximately $35 million and $40 million in 2013 and 2014, respectively.

See Note 5 of the Combined Notes to Consolidated Financial Statements for additional information.

***FERC Ameren Order.*** In July 2012, FERC issued an order indicating that Ameren Corporation (Ameren) had improperly included acquisition premiums/goodwill in its transmission formula rate, particularly in its capital structure and in the application of AFUDC. FERC also directed Ameren to make refunds for the implied increase in rates in prior years. Ameren has filed for rehearing regarding the July 2012 FERC order. ComEd believes that the FERC order authorizing its transmission formula rate is distinguishable from the circumstances that led to the July 2012 FERC order in the Ameren case. However, if ComEd were required to exclude acquisition premiums/goodwill from its transmission formula rate, the impact could be material to ComEd’s results of operations and cash flows.

***FERC Order No. 1000 Compliance.*** In FERC Order No. 1000, the FERC required public utility transmission providers to enhance their transmission planning procedures and their cost allocation methods applicable to certain new regional and interregional transmission projects. As part of the changes to the transmission planning procedures, the FERC required removal from all FERC-approved tariffs and agreements a federal right of first refusal to build certain new transmission facilities. In compliance with the regional transmission planning requirements of Order No. 1000, PJM as the transmission provider submitted a compliance filing to FERC on October 25, 2012. On the same day, certain of the PJM transmission owners including ComEd, PECO and BGE (collectively, the PJM Transmission Owners) submitted a filing asserting that their contractual rights embodied in the PJM governing documents continue to justify their right of first refusal to construct new reliability (and related) transmission projects and that the FERC should not be allowed to override such rights absent a showing that it is in the public interest to do so under the FERC’s “*Mobile-Sierra”* standard of review. This is a heightened standard of review which the PJM Transmission Owners argued could not be satisfied based on the facts applicable to them. On March 22, 2013, FERC issued an order on the PJM Compliance Filing and the filing of these PJM Transmission Owners (1) rejecting the arguments of such PJM Transmission Owners that the PJM governing documents were entitled to review under the *Mobile-Sierra* standard, (2) accepting most of the PJM filing, removing the right-of-first refusal from the PJM tariffs; and (3) directing PJM to remove certain exceptions that it included in its compliance filing that FERC found did not comply with Order No. 1000. FERC’s order could enable third parties to seek to build certain regional transmission projects that had previously been reserved for the PJM Transmission Owners, potentially reducing ComEd’s, PECO’s and BGE’s financial return on new investments in energy transmission facilities.

***FERC Transmission Complaint.*** On February 27, 2013, consumer advocates and regulators from the District of Columbia, New Jersey, Delaware and Maryland, and the Delaware Electric Municipal Cooperatives (the parties), filed a complaint at FERC against BGE and the Pepco Holdings, Inc. companies relating to their respective transmission formula rates. As of March 31, 2013, BGE cannot predict the likelihood or a reasonable estimate of the amount of a change, if any, in the allowed base ROE, or a reasonable estimate of the refund period start date. While BGE cannot predict the outcome of this matter, if FERC orders a reduction of BGE’s base ROE to 8.7%, the annual impact would be a reduction in revenues of approximately $10 million.

See Note 5 of the Combined Notes to Consolidated Financial Statements for additional information.

### Critical Accounting Policies and Estimates

Management of each of the Registrants makes a number of significant estimates, assumptions and judgments in the preparation of its financial statements. See “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Critical Accounting Policies and Estimates” in the Exelon’s,

Generation’s, ComEd’s, PECO’s and BGE’s combined 2012 Form 10-K for a discussion of the estimates and judgments necessary in the Registrants’ accounting for AROs, purchase accounting, asset impairments, depreciable lives of property, plant and equipment, defined benefit pension and other postretirement benefits, regulatory accounting, derivative instruments, taxation, contingencies and revenue recognition. At March 31, 2013, the Registrants’ critical accounting policies and estimates had not changed significantly from December 31, 2012.

### Results of Operations

### Net Income (Loss) on Common Stock by Registrant

|  | Three Months Ended March 31, 2013 | 2012(a) | Favorable (Unfavorable) Variance |
| --- | ---: | ---: | ---: |
| Exelon | $(4) | $200 | $(204) |
| Generation | (18) | 168 | (186) |
| ComEd | (81) | 87 | (168) |
| PECO | 121 | 96 | 25 |
| BGE | 77 | (33) | 110 |

(a) For BGE, reflects BGE’s operations for the three months ended March 31, 2012. For Exelon and Generation, includes the operations of the acquired businesses from the date of the merger, March 12, 2012, through March 31, 2012.

### Results of Operations — Generation

|  | Three Months Ended March 31, 2013 | 2012 | Favorable (Unfavorable) Variance |
| --- | ---: | ---: | ---: |
| **Operating revenues** | $3,533 | $2,743 | $790 |
| **Purchased power and fuel** | 2,169 | 1,044 | (1,125) |
| **Revenue net of purchased power and fuel(a)** | 1,364 | 1,699 | (335) |
| **Operating other expenses** |  |  |  |
| Operating and maintenance | 1,112 | 1,179 | 67 |
| Depreciation and amortization | 214 | 153 | (61) |
| Taxes other than income | 93 | 73 | (20) |
| Total other operating expenses | 1,419 | 1,405 | (14) |
| **Equity in losses of unconsolidated affiliates** | (9) | (22) | 13 |
| **Operating income (loss)** | (64) | 272 | (336) |
| **Other income and deductions** |  |  |  |
| Interest expense | (82) | (54) | (28) |
| Other, net | 128 | 178 | (50) |
| Total other income and deductions | 46 | 124 | (78) |
| **Income before income taxes** | (18) | 396 | (414) |
| **Income taxes** | (1) | 230 | 231 |
| **Net income (loss)** | (17) | 166 | (183) |
| Net loss attributable to noncontrolling interests | 1 | (2) | (3) |
| **Net income (loss) on common stock** | $(18) | $168 | $(186) |

(a) Generation evaluates its operating performance using the measure of revenue net of purchased power and fuel expense. Generation believes that revenue net of purchased power and fuel expense is a useful measurement because it provides information that can be used to evaluate its operational performance. Revenue net of purchased power and fuel expense is not a presentation defined under GAAP and may not be comparable to other companies’ presentations or deemed more useful than the GAAP information provided elsewhere in this report.

### Net Income (loss)

Generation’s net income (loss) for the three months ended March 31, 2013 decreased compared to the same period in 2012 primarily due to lower revenue, net of purchased power and fuel, unfavorable NDT fund performance and higher depreciation expense; partially offset by lower operating and maintenance expense. The decrease in revenue, net of purchased power and fuel was primarily due to mark-to-market losses in 2013. The decrease in operating and maintenance expense was largely due to 2012 costs associated with a settlement with the FERC in March 2012 and a decrease in transaction costs and employee-related costs associated with the merger.

### Revenue Net of Purchased Power and Fuel

The foundation of Generation’s six reportable segments is based on the geographic location of its assets, and is largely representative of the footprints of an ISO / RTO and/or NERC region. Descriptions of each of Generation’s six reportable segments are as follows:

- Mid-Atlantic represents operations in the eastern half of PJM, which includes Pennsylvania, New Jersey, Maryland, Virginia, West Virginia, Delaware, the District of Columbia and parts of North Carolina.
- Midwest represents operations in the western half of PJM, which includes portions of Illinois, Indiana, Ohio, Michigan, Kentucky and Tennessee, and the entire United States footprint of MISO, which covers all or most of North Dakota, South Dakota, Nebraska, Minnesota, Iowa, Wisconsin, the remaining parts of Illinois, Indiana, Michigan and Ohio not covered by PJM, and parts of Montana, Missouri and Kentucky.
- New England represents the operations within ISO-NE covering the states of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island and Vermont.
- New York represents operations within New York ISO, which covers the state of New York in its entirety.
- ERCOT represents operations within Electric Reliability Council of Texas, covering most of the state of Texas.
- Other Regions not considered individually significant:
- South represents operations in the FRCC and the remaining portions of the SERC not included within MISO or PJM, which includes all or most of Florida, Arkansas, Louisiana, Mississippi, Alabama, Georgia, Tennessee, North Carolina, South Carolina and parts of Missouri, Kentucky and Texas. Generation’s South region also includes operations in the SPP, covering Kansas, Oklahoma, most of Nebraska and parts of New Mexico, Texas, Louisiana, Missouri, Mississippi and Arkansas.
- West represents operations in the WECC, which includes California ISO, and covers the states of California, Oregon, Washington, Arizona, Nevada, Utah, Idaho, Colorado, and parts of New Mexico, Wyoming and South Dakota.
- Canada represents operations across the entire country of Canada and includes the AESO, OIESO and the Canadian portion of MISO.

The following business activities are not allocated to a region, and are reported under Other: retail and wholesale gas, investments in natural gas exploration and production activities, proprietary trading, energy efficiency and demand response, the design, construction, and operation of renewable energy, heating, cooling, and cogeneration facilities, and home improvements, sales of electric and gas appliances, servicing of heating, air conditioning, plumbing, electrical, and indoor quality systems. Further, the following activities are not allocated to a region, and are reported in Other: compensation under the reliability-must-run rate schedule; results of operations from the Maryland Clean-Coal assets sold in the fourth quarter of 2012; unrealized mark-to-market impact of economic hedging activities; amortization of certain intangible assets relating to commodity contracts recorded at fair value as a result of the merger; and other miscellaneous revenues.

Generation evaluates the operating performance of its power marketing activities using the measure of revenue net of purchased power and fuel expense which is a non-GAAP measurement. Generation’s operating revenues include all sales to third parties and affiliated sales to ComEd, PECO and BGE. Purchased power costs include all costs associated with the procurement and supply of electricity including capacity, energy and ancillary services. Fuel expense includes the fuel costs for internally generated energy and fuel costs associated with tolling agreements.

For the three months ended March 31, 2013 and 2012, Generation’s revenue net of purchased power and fuel expense by region were as follows:

|  | Three Months Ended March 31, 2013 | 2012(a) | Variance | % Change |
| --- | ---: | ---: | ---: | --- |
| Mid-Atlantic(b) | $844 | $770 | $74 | 9.6% |
| Midwest(c) | 717 | 817 | (100) | (12.2)% |
| New England | 30 | 39 | (9) | (23.1)% |
| New York | (22) | 8 | (30) | n.m |
| ERCOT | 101 | 34 | 67 | n.m |
| Other Regions(d) | 45 | 14 | 31 | n.m. |
| Total electric revenue net of purchased power and fuel | 1,715 | 1,682 | 33 | 2.0% |
| Proprietary Trading | 9 | (4) | 13 | n.m |
| Mark-to-market gains (losses) | (403) | 60 | (463) | n.m. |
| Other(e) | 43 | (39) | 82 | n.m. |
| Total revenue net of purchased power and fuel | $1,364 | $1,699 | $(335) | (19.7)% |

(a) Includes results for Constellation beginning on March 12, 2012, the date the merger was completed.

(b) Results of transactions with PECO and BGE are included in the Mid-Atlantic region.

(c) Results of transactions with ComEd are included in the Midwest region.

(d) Other Regions includes South, West and Canada, which are not considered individually significant.

(e) Other represents activities not allocated to a region. See text above for a description of included activities. Also includes amortization of intangible assets related to commodity contracts recorded at fair value at the merger date of $174 million and $122 million, for the three months ended March 31, 2013 and 2012, respectively.

Generation’s supply sources by region are summarized below:

| Supply source in GWh Nuclear generation(b) | Three Months Ended March 31, 2013 | 2012(a) | Variance | % Change |
| --- | ---: | ---: | ---: | ---: |
| Mid-Atlantic | 12,762 | 12,064 | 698 | 5.8% |
| Midwest | 23,269 | 23,198 | 71 | 0.3% |
| Total Nuclear Generation | 36,031 | 35,262 | 769 | 2.2% |
| Fossil and Renewables(b) |  |  |  |  |
| Mid-Atlantic(b)(d) | 3,160 | 1,791 | 1,369 | 76.4% |
| Midwest | 581 | 272 | 309 | 113.6% |
| New England | 2,392 | 889 | 1,503 | n.m. |
| New York | — | — | — | 0% |
| ERCOT | 733 | 840 | (107) | (12.7)% |
| Other Regions(e) | 2,254 | 819 | 1,435 | n.m. |
| Total Fossil and Renewables | 9,120 | 4,611 | 4,509 | 97.8% |
| Purchased power |  |  |  |  |
| Mid-Atlantic(c) | 3,233 | 2,577 | 656 | 25.5% |
| Midwest | 1,700 | 2,552 | (852) | (33.4)% |
| New England | 1,507 | 1,100 | 407 | 37.0% |
| New York(c) | 3,511 | 935 | 2,576 | n.m. |
| ERCOT | 4,199 | 2,832 | 1,367 | 48.3% |
| Other Regions(e) | 3,703 | 1,769 | 1,934 | 109.3% |
| Total Purchased Power | 17,853 | 11,765 | 6,088 | 51.7% |
| Total supply/sales by region(f) |  |  |  |  |
| Mid-Atlantic(g) | 19,155 | 16,432 | 2,723 | 16.6% |
| Midwest(h) | 25,550 | 26,022 | (472) | (1.8)% |
| New England | 3,899 | 1,989 | 1,910 | 96.0% |
| New York | 3,511 | 935 | 2,576 | n.m. |
| ERCOT | 4,932 | 3,672 | 1,260 | 34.3% |
| Other Regions(e) | 5,957 | 2,588 | 3,369 | 130.2% |
| Total supply/sales by region | 63,004 | 51,638 | 11,366 | 22.0% |

(a) Includes results for Constellation beginning on March 12, 2012, the date the merger was completed.

(b) Includes the proportionate share of output where Generation has an undivided ownership interest in jointly owned generating plants and does not include ownership through equity method investments (e.g., CENG).

(c) Purchased power for the three months ended March 31, 2013 includes physical volumes of 2,588 GWh in the Mid-Atlantic and 3,213 GWh in New York as a result of the PPA with CENG. Purchased power for the three months ended March 31, 2012 includes physical volumes of 319 GWh in the Mid-Atlantic and 722 GWh in New York as a result of the PPA with CENG.

(d) Excludes 2012 activity related to generation under the reliability-must-run rate schedule and generation of Brandon Shores, H.A. Wagner, and C.P. Crane, the generating facilities divested in the fourth quarter of 2012 as a result of the Exelon and Constellation merger.

(e) Other Regions includes South, West and Canada, which are not considered individually significant.

(f) Excludes physical proprietary trading volumes of 1,572 GWh and 1,888 GWh for the three months ended March 31, 2013 and 2012, respectively.

(g) Includes sales to PECO through the competitive procurement process of 1,921 GWh and 1,629 GWh for the three months ended March 31, 2013 and 2012, respectively. Sales to BGE of 1,535 GWh and 259 GWh were included for the three months ended March 31, 2013 and 2012, respectively.

(h) Includes sales to ComEd under the RFP of 0 GWh and 2,210 GWh for the three months ended March 31, 2013 and 2012, respectively.

The following table presents electric revenue net of purchased power and fuel expense per MWh of electricity sold during the three months ended March 31, 2013 as compared to the three months ended March 31, 2012.

| $/MWh | Three Months Ended March 31, 2013 | 2012(a) | % Change |
| --- | ---: | ---: | ---: |
| Mid-Atlantic(b) | $44.04 | $46.86 | (6.0)% |
| Midwest(c) | 28.08 | 31.40 | (10.6)% |
| New England | 7.63 | 19.61 | (61.1)% |
| New York | (6.27) | 8.56 | n.m. |
| ERCOT | 20.54 | 9.26 | 121.9% |
| Other Regions(d) | 7.61 | 5.41 | 40.6% |
| Electric revenue net of purchased power and fuel expense per MWh(e)(f) | 27.23 | 32.57 | (16.4)% |

(a) Includes financial results for Constellation beginning on March 12, 2012, the date the merger was completed.

(b) Includes sales to PECO of $141 (1,921 GWh) and $111 million (1,629 GWh) for the three months ended March 31, 2013 and 2012, respectively. Sales to BGE of $113 million (1,535 GWh) and $19 million (259 GWh) were included for the three months ended March 31, 2013 and 2012, respectively. Excludes compensation under the reliability-must-run rate schedule and the financial results of Brandon Shores, H.A. Wagner, and C.P. Crane, the generating facilities divested in the fourth quarter of 2012 as a result of the merger.

(c) Includes sales to ComEd of $0 million (0 GWh) and $82 million (2,210 GWh) and settlements of the ComEd swap of $145 million and $165 million for the three months ended March 31, 2013 and 2012, respectively.

(d) Other Regions includes South, West and Canada, which are not considered individually significant.

(e) Revenue net of purchased power and fuel expense per MWh represents the average margin per MWh of electricity sold during the three months ended March 31, 2013 and 2012 and excludes the mark-to-market impact of Generation’s economic hedging activities.

(f) Excludes retail gas activity, proprietary trading portfolio activity, compensation under the reliability-must-run rate schedule and fuel sales. Also excludes results from energy efficiency, energy management and demand response, upstream natural gas and the design and construction of customer sited solar facilities. In addition, excludes the financial results of Brandon Shores, H.A. Wagner, and C.P. Crane, the generating facilities divested in the fourth quarter of 2012 as a result of the Exelon and Constellation merger. Also excludes amortization of intangible assets relating to commodity contracts recorded at fair value at the merger date of $174 million and $122 million, for the three months ended March 31, 2013 and 2012, respectively.

#### Mid-Atlantic.

*Three Months Ended March 31, 2013 Compared to Three Months Ended March 31, 2012.* The $74 million increase in revenue net of purchased power and fuel expense in the Mid-Atlantic was primarily due to the addition of Constellation, higher nuclear volume and capacity revenue, partially offset by increased nuclear fuel costs.

#### Midwest

*Three Months Ended March 31, 2013 Compared to Three Months Ended March 31, 2012.* The $100 million decrease in revenue net of purchased power and fuel expense in the Midwest was primarily due to lower capacity revenues and increased nuclear fuels costs.

#### New England

*Three Months Ended March 31, 2013 Compared to Three Months Ended March 31, 2012.* The $9 million decrease in revenue net of purchased power and fuel expense in New England was due to increased power and fuel costs, resulting in lower margins on load.

#### New York

*Three Months Ended March 31, 2013 Compared to Three Months Ended March 31, 2012.* The $30 million decrease in revenue net of purchased power and fuel expense in New York was due primarily to the addition of Constellation.

#### ERCOT

*Three Months Ended March 31, 2013 Compared to Three Months Ended March 31, 2012.* The $67 million increase in revenue net of purchased power and fuel expense in ERCOT was primarily a result of the addition of Constellation.

#### Other Regions

*Three Months Ended March 31, 2013 Compared to Three Months Ended March 31, 2012.* The $31 million increase in revenue net of purchased power and fuel expense in Other Regions was primarily as a result of the addition of Constellation.

#### Mark-to-market

*Three Months Ended March 31, 2013 Compared to Three Months Ended March 31, 2012.* Generation is exposed to market risks associated with changes in commodity prices and enters into economic hedges to mitigate exposure to these fluctuations. Mark-to-market losses on economic hedging activities were $403 million for the three months ended March 31, 2013 compared to gains of $60 million for the three months ended March 31, 2012. See Notes 8 and 9 of the Combined Notes to Consolidated Financial Statements for information on gains and losses associated with mark-to-market derivatives.

#### Other

*Three Months Ended March 31, 2013 Compared to Three Months Ended March 31, 2012.* The $82 million increase in other revenue net of purchased power and fuel was primarily due to the addition of Constellation which includes wholesale and retail gas, energy efficiency, energy management and demand response, upstream natural gas and the design and construction of renewable energy facilities. In addition, other revenue net of purchased power and fuel for 2012 includes the results of Brandon Shores, H.A. Wagner and C.P. Crane, the generating facilities divested in the fourth quarter 2012 as a result of the Exelon and Constellation merger. This increase was partially offset by a decrease in the compensation under the reliability-must-run rate schedule, in addition to amortization of the acquired energy contracts recorded at fair value at the merger date. See Note 4 of the Combined Notes to Consolidated Financial Statements for information regarding contract intangibles.

*Nuclear Fleet Capacity Factor and Production Costs.* The following table presents nuclear fleet operating data for the three months ended March 31, 2013 as compared to 2012, for the Exelon-operated plants. The nuclear fleet capacity factor presented in the table is defined as the ratio of the actual output of a plant over a period of time to its output if the plant had operated at full average annual mean capacity for that time period. Nuclear fleet production cost is defined as the costs to produce one MWh of energy, including fuel, materials, labor, contracting and other miscellaneous costs, but excludes depreciation and certain other non-production related overhead costs. Generation considers capacity factor and production costs useful measures to analyze the nuclear fleet performance between periods. Generation has included the analysis below as a complement to the financial information provided in accordance with GAAP. However, these measures are not a presentation defined under GAAP and may not be comparable to other companies’ presentations or be more useful than the GAAP information provided elsewhere in this report.

|  | Three Months Ended March 31, 2013 | 2012 |
| --- | ---: | ---: |
| Nuclear fleet capacity factor(a) | 96.4% | 93.6% |
| Nuclear fleet production cost per MWh(a) | $19.67 | $20.06 |

(a) Reflects ownership percentage of stations operated by Exelon. Excludes Salem, which is operated by PSEG Nuclear, LLC, and Exelon’s ownership in jointly owned generating plants through equity method investments (e.g. CENG).

The nuclear fleet capacity factor, which excludes Salem, increased primarily due to a lower number of unplanned outage days and planned refueling outage days, which resulted in higher generation, during the three months ended March 31, 2013 compared to the same period in 2012. For the three months ended March 31, 2013 and 2012, unplanned outage days totaled 6 and 16, respectively, and planned refueling outage days totaled 49 and 67, respectively. An increase in nuclear generation resulted in a lower production cost per MWh for the three months ended March 31, 2013 as compared to the same period in 2012.

### Operating and Maintenance

The change in operating and maintenance expense for the three months ended March 31, 2013 compared to the same period in 2012, consisted of the following:

|  | Increase (Decrease) |
| --- | ---: |
| FERC settlement(a) | $(195) |
| Constellation merger and integration costs | (53) |
| Nuclear refueling outage costs, including the co-owned Salem plant(b) | (27) |
| Labor, other benefits, contracting and materials | 158 |
| Corporate allocations(c) | 37 |
| Other | 13 |
| Decrease in operating and maintenance expense | $(67) |

(a) Reflects costs incurred as part of a March 2012 settlement with the FERC to resolve a dispute related to Constellation’s prior period hedging and risk management transactions.

(b) Reflects the impact of decreased planned refueling outage days in 2013.

(c) Reflects the impact of an increased share of corporate allocated costs due to the merger.

### Depreciation and Amortization

The increase in depreciation and amortization expense for the three months ended March 31, 2013 compared to the same period in 2012 was primarily due to higher plant balances due to the addition of Constellation facilities, capital additions and upgrades to existing facilities.

### Taxes Other Than Income

The increase in taxes other than income for the three months ended March 31, 2013 compared to the same period in 2012 was primarily due to the addition of Constellation’s financial results in March 2012.

### Equity in Losses of Unconsolidated Affiliates

Equity in losses of unconsolidated affiliates decreased by $13 million primarily due to net income generated from Exelon’s equity investment in CENG in 2013 compared to the loss recorded by CENG from March 12, 2012 through March 31, 2012. The loss recorded for this period in 2012 was due to planned nuclear fueling outage days. Partially offsetting this improvement in CENG’s earnings, Generation’s results were also affected by increased amortization of the basis difference in CENG recorded at fair value at the merger.

### Interest Expense

The increase in interest expense for the three months ended March 31, 2013 compared to the same period in 2012 was primarily due to the long-term debt assumed in connection with the merger and an increase in debt issued at Generation in June 2012.

### Other, Net

Other, net primarily reflects the change in the gain/loss position for the three months ended March 31, 2013 compared to the same period in 2012 related to the NDT funds of its Non-Regulatory Agreement Units as described in the table below. Other, net also reflects $43 million of income in 2013 compared to $64 million of income in 2012 related to the contractual elimination of income tax expenses in March 31, 2013 and 2012, respectively, associated with the NDT funds of the Regulatory Agreement Units.

The following table provides unrealized and realized gains on the NDT funds of the Non-Regulatory Agreement Units recognized in Other, net for the three months ended March 31, 2013 and 2012:

|  | Three Months Ended March 31, 2013 | 2012 |
| --- | ---: | ---: |
| Net unrealized gains on decommissioning trust funds | $64 | $65 |
| Net realized gains on sale of decommissioning trust funds | 2 | 37 |

### Effective Income Tax Rate

The effective income tax rate was 5.6% for the three months ended March 31, 2013 compared to 58.1% for the same period during 2012. See Note 11 — of the Combined Notes to Consolidated Financial Statements for further discussion of the change in effective income tax rate.

### Results of Operations — ComEd

|  | Three Months Ended Ended March 31, 2013 | 2012 | Favorable (Unfavorable) Variance |
| --- | ---: | ---: | ---: |
| **Operating revenues** | $1,160 | $1,388 | $(228) |
| **Purchased power expense** | 382 | 620 | 238 |
| **Revenue net of purchased power expense(a)** | 778 | 768 | 10 |
| **Other operating expenses** |  |  |  |
| Operating and maintenance | 328 | 318 | (10) |
| Depreciation and amortization | 167 | 149 | (18) |
| Taxes other than income | 74 | 75 | 1 |
| Total other operating expenses | 569 | 542 | (27) |
| **Operating income** | 209 | 226 | (17) |
| **Other income and deductions** |  |  |  |
| Interest expense, net | (353) | (82) | (271) |
| Other, net | 5 | 4 | 1 |
| Total other income and deductions | (348) | (78) | (270) |
| **Income (loss) before income taxes** | (139) | 148 | (287) |
| **Income taxes** | (58) | 61 | 119 |
| **Net income (loss)** | $(81) | $87 | $(168) |

(a) ComEd evaluates its operating performance using the measure of revenue net of purchased power expense. ComEd believes that revenue net of purchased power expense is a useful measurement because it provides information that can be used to evaluate its operational performance. In general, ComEd only earns margin based on the delivery and transmission of electricity. ComEd has included its discussion of revenue net of purchased power expense below as a complement to the financial information provided in accordance with GAAP. However, revenue net of purchased power expense is not a presentation defined under GAAP and may not be comparable to other companies’ presentations or deemed more useful than the GAAP information provided elsewhere in this report.

### Net Income (Loss)

ComEd’s net loss for the three months ended March 31, 2013, was primarily due to the remeasurement of Exelon’s like-kind exchange tax position in the first quarter of 2013. See Note 11 of the Combined Notes to Consolidated Financial Statements for additional information

### Operating Revenues Net of Purchased Power Expense

There are certain drivers of revenue that are fully offset by their impact on purchased power expense, such as commodity procurement costs and customer choice programs. ComEd is permitted to recover its electricity procurement costs from retail customers without mark-up. Therefore, fluctuations in electricity procurement costs have no impact on electric revenues net of purchased power expense. See Note 5 of the Combined Notes to Consolidated Financial Statements for additional information on ComEd’s electricity procurement process.

Electric revenues and purchased power expense are affected by fluctuations in customers’ purchases from competitive retail electric suppliers. All ComEd customers have the ability to purchase electricity from an alternative retail electric supplier. The customer choice of retail electric supplier does not impact the volume of deliveries, but affects revenue collected from customers related to supplied energy services. The number of retail customers purchasing electricity from alternative retail electric suppliers was 2,589,931 and 492,079 at March 31, 2013, and 2012, respectively, representing 67% and 13% of total retail customers, respectively. Retail energy purchased from alternative retail electric suppliers represented 75% and 60% of ComEd’s retail kWh sales at March 31, 2013, and 2012, respectively. During 2012, The City of Chicago and approximately 240 Illinois municipalities approved referenda regarding electric supply aggregation. This approval allowed municipal officials to identify and sign contracts with alternative retail electric suppliers. With few exceptions, approximately 170 municipalities have identified and switched to alternative retail electric suppliers by the end of December 31, 2012. City of Chicago customers switched to alternative retail electric suppliers the first quarter of 2013. All or some of the other 70 municipalities and townships are also expected to switch during the first half of 2013. As contracts with new retail electric suppliers take effect, ComEd expects the percentage of energy purchased from retail electric suppliers to continue to increase. It is anticipated that by the end of the second quarter 2013 approximately 71% of retail customers and 81% of energy sales in the ComEd region will be supplied by alternative retail electric suppliers.

The changes in ComEd’s electric revenues net of purchased power expense for the three months ended March 31, 2013, compared to the same period in 2012 consisted of the following:

|  | Increase (Decrease) |
| --- | ---: |
| Weather delivery | $18 |
| Electric distribution revenues | 12 |
| Regulatory required programs cost recovery | 3 |
| Volume delivery | (4) |
| Uncollectible accounts recovery, net | (14) |
| Other | (5) |
| Total increase | $10 |

#### Weather delivery

The demand for electricity is affected by weather conditions. Very warm weather in summer months and very cold weather in other months are referred to as “favorable weather conditions” because these weather conditions result in increased customer usage and delivery of electricity. Conversely, mild weather reduces demand. The favorable weather conditions for the three months ended March 31, 2013, resulted in an increase in revenues net of purchased power expense.

Heating and cooling degree days are quantitative indices that reflect the demand for energy needed to heat or cool a home or business. Normal weather is determined based on historical average heating and cooling degree days for a 30-year period in ComEd’s service territory. The changes in heating and cooling degree days in ComEd’s service territory for the three months ended March 31, 2013, and 2012, consisted of the following:

|  | 2013 | 2012 | Normal | % Change From 2012 | From Normal |
| --- | ---: | ---: | ---: | ---: | ---: |
| Heating Degree-Days | 3,259 | 2,384 | 3,164 | 36.7% | 3.0% |
| Cooling Degree-Days | — | 39 | — | n/a | n/a |

#### Electric distribution revenues

EIMA provides for a performance-based formula rate tariff. The legislation provides for an annual reconciliation of the revenue requirement in effect to the actual costs that the ICC determines are prudently and reasonably incurred in a given year. During the three months ended March 31, 2013, ComEd recorded a $50 million increase in revenues associated with the first quarter of the 2013 reconciliation. This increase in revenue for the three months ended March 31, 2013, as compared to the same period in 2012 was partially offset by a $28 million net reduction to revenues associated with the 2012 and 2011 reconciliations. The net increase in revenues associated with the 2013-2011 reconciliations were also partially offset by a decrease in ComEd’s annual electric distribution revenue requirement under EIMA as compared to the revenue requirement permitted in the 2010 Rate Case. See Note 5 of the Combined Notes to Consolidated Financial Statements for additional information.

#### Regulatory required programs cost recovery

Revenues related to regulatory required programs are the recoveries from customers for costs of various legislative and/or regulatory programs on a full and current basis through approved regulated rates. Programs include ComEd’s energy efficiency and demand response and purchased power administrative costs. An equal and offsetting amount has been reflected in operating and maintenance expense during the periods presented. Refer to the operating and maintenance expense discussion below for additional information on included programs.

#### Transmission

ComEd’s transmission rates are established based on a FERC-approved formula. ComEd’s most recent annual formula rate update, filed in April 2013, reflects 2012 actual costs plus forecasted 2013 capital additions. Transmission revenues net of purchased power expense vary from year to year based upon fluctuations in the underlying costs, investments being recovered and other billing determinants, such as the highest daily peak load from the previous calendar year. See Note 5 of the Combined Notes to Consolidated Financial Statements for additional information.

#### Volume delivery

Revenues net of purchased power expense decreased as a result of lower delivery volume, exclusive of the effects of weather, reflecting decreased average usage per residential customer for 2013, compared to 2012.

#### Uncollectible accounts recovery, net

Represents recoveries under ComEd’s uncollectible accounts tariff. Refer to the operating and maintenance expense discussion below for additional information on this tariff.

#### Other

Other revenues were lower during the three months ended March 31, 2013, compared to 2012. Other revenues, which can vary period to period, include rental revenues, revenues related to late payment charges, assistance provided to other utilities through mutual assistance programs, and recoveries of environmental costs associated with MGP sites.

### Operating and Maintenance Expense

|  | Three Months Ended March 31, 2013 | 2012 | Increase |
| --- | ---: | ---: | ---: |
| Operating and maintenance expense — baseline | $268 | $261 | $7 |
| Operating and maintenance expense — regulatory required programs(a) | 60 | 57 | 3 |
| Total operating and maintenance expense | 328 | 318 | 10 |

(a) Operating and maintenance expenses for regulatory required programs are costs for various legislative and/or regulatory programs that are recoverable from customers on a full and current basis through approved regulated rates. An equal and offsetting amount has been reflected in operating revenues.

The changes in operating and maintenance expense for the three months ended March 31, 2013, compared to the same period in 2012, consisted of the following:

| Baseline | Increase (Decrease) |
| --- | ---: |
| Labor, other benefits, contracting and materials | $16 |
| Pension and non-pension postretirement benefits expense | 6 |
| Uncollectible accounts expense—provision(a) | (7) |
| Uncollectible accounts expense—recovery, net(a) | (7) |
| Other | (1) |
|  | 7 |
| Regulatory required programs |  |
| Energy efficiency and demand response programs | 3 |
|  | 3 |
| Increase in operating and maintenance expense | $10 |

(a) On February 2, 2010, the ICC issued an order adopting ComEd’s proposed tariffs filed in accordance with Illinois legislation providing public utilities the ability to recover from or refund to customers the difference between the utility’s annual uncollectible accounts expense and amounts collected in rates annually through a rider mechanism starting with 2008 and prospectively.

### Depreciation and Amortization

Depreciation and amortization expense increased during the three months ended March 31, 2013, compared to the same period in 2012 primarily due to increased amortization of the regulatory assets.

### Taxes Other Than Income

Taxes other than income decreased during the three months ended March 31, 2013, compared to the same period in 2012. Taxes other than income, which can vary period to period, include municipal and state utility taxes, real estate taxes, and payroll taxes.

### Interest Expense, net

The changes in Interest Expense, net for the three months ended March 31, 2013, compared to the same period in 2012, consisted of the following:

|  | Increase (Decrease) |
| --- | ---: |
| Interest expense related to uncertain tax positions(a) | $277 |
| Interest expense on debt (including financing trusts) | (3) |
| Other | (3) |
| Increase in interest expense, net | $271 |

(a) Primarily reflects the remeasurement of Exelon’s like-kind exchange tax position in the first quarter of 2013. See Note 11 of the Combined Notes to Consolidated Financial Statements for additional information.

### Effective Income Tax Rate

The effective income tax rate was 41.7% for the three months ended March 31, 2013, compared to 41.2% for the same period during 2012. See Note 11 of the Combined Notes to Consolidated Financial Statements for additional information regarding the components of the effective income tax rates.

### ComEd Electric Operating Statistics and Revenue Detail

| Retail Deliveries to customers (in GWhs) Retail Delivery and Sales(a) | Three Months Ended March 31, 2013 | 2012 | % Change | Weather- Normal % Change |
| --- | ---: | ---: | ---: | ---: |
| Residential | 6,876 | 6,406 | 7.3% | (0.1)% |
| Small commercial & industrial | 7,873 | 7,916 | (0.5)% | (3.2)% |
| Large commercial & industrial | 6,840 | 6,703 | 2.0% | (0.4)% |
| Public authorities & electric railroads | 373 | 325 | 14.8% | 9.7% |
| Total Retail | 21,962 | 21,350 | 2.9% | (1.2)% |
|  | **As of March 31,** |  |  |  |
| **Number of Electric Customers** | **2013** | **2012** |  |  |
| Residential | 3,470,659 | 3,465,669 |  |  |
| Small commercial & industrial | 366,284 | 365,525 |  |  |
| Large commercial & industrial | 2,001 | 2,013 |  |  |
| Public authorities & electric railroads | 4,802 | 4,790 |  |  |
| Total | 3,843,746 | 3,837,997 |  |  |
|  | **Three Months Ended March 31,** |  |  |  |
| **Electric Revenue** | **2013** | **2012** | **% Change** |  |
| **Retail Delivery and Sales(a)** |  |  |  |  |
| Residential | $584 | $775 | (24.6)% |  |
| Small commercial & industrial | 308 | 348 | (11.5)% |  |
| Large commercial & industrial | 102 | 100 | 2.0% |  |
| Public authorities & electric railroads | 12 | 12 | 0.0% |  |
| Total Retail | 1,006 | 1,235 | (18.5)% |  |
| Other Revenue(b) | 154 | 153 | 0.7% |  |
| **Total Electric Revenues** | $1,160 | $1,388 | (16.4)% |  |

166

(a) Reflects delivery volumes and revenues from customers purchasing electricity directly from ComEd and customers purchasing electricity from a competitive electric generation supplier. All customers are assessed charges for delivery. For customers purchasing electricity from ComEd, revenue also reflects the cost of energy and transmission.

(b) Other revenue primarily includes transmission revenue from PJM. Other items include rental revenue, revenues related to late payment charges, assistance provided to other utilities through mutual assistance programs and recoveries of environmental remediation costs associated with MGP site.

### Results of Operations — PECO

|  | Three Months Ended March 31, 2013 | 2012 | Favorable (Unfavorable) Variance |
| --- | ---: | ---: | ---: |
| **Operating revenues** | $895 | $875 | $20 |
| **Purchased power and fuel** | 406 | 411 | 5 |
| **Revenue net of purchased power and fuel(a)** | 489 | 464 | 25 |
| **Other operating expenses** |  |  |  |
| Operating and maintenance | 188 | 203 | 15 |
| Depreciation and amortization | 57 | 53 | (4) |
| Taxes other than income | 41 | 31 | (10) |
| Total other operating expenses | 286 | 287 | 1 |
| **Operating income** | 203 | 177 | 26 |
| **Other income and (deductions)** |  |  |  |
| Interest expense, net | (29) | (31) | 2 |
| Other, net | 3 | 2 | 1 |
| Total other income and (deductions) | (26) | (29) | 3 |
| **Income before income taxes** | 177 | 148 | 29 |
| **Income taxes** | 55 | 51 | (4) |
| **Net income** | 122 | 97 | 25 |
| Preferred security dividends | 1 | 1 | — |
| **Net income on common stock** | $121 | $96 | $25 |

(a) PECO evaluates its operating performance using the measures of revenue net of purchased power expense for electric sales and revenue net of fuel expense for gas sales. PECO believes revenue net of purchased power expense and revenue net of fuel expense are useful measurements of its performance because they provide information that can be used to evaluate its net revenue from operations. PECO has included the analysis below as a complement to the financial information provided in accordance with GAAP. However, revenue net of purchased power expense and revenue net of fuel expense figures are not a presentation defined under GAAP and may not be comparable to other companies’ presentations or more useful than the GAAP information provided elsewhere in this report.

### Net Income

The increase in net income was driven primarily by higher operating revenue net of purchased power and fuel expense and a decrease in operating and maintenance expenses, partially offset by higher taxes other than income. The increase in revenue net of purchased power and fuel expense was the result of favorable weather, which was partially offset by the impact of pricing.

### Operating Revenues, Purchased Power and Fuel Expense

There are certain drivers to operating revenue that are offset by their impact on purchased power expense and fuel expense, such as commodity procurement costs and customer choice programs. Electric and gas revenues and purchased power and fuel expense are affected by fluctuations in commodity procurement costs. PECO’s electric supply and natural gas cost rates charged to customers are subject to adjustments at least quarterly that are designed to recover or refund the difference between the actual cost of electric supply and natural gas and the amount included in rates in accordance with the PAPUC’s GSA and PGC, respectively. Therefore, fluctuations in electric supply and natural gas procurement costs have no impact on electric and gas revenue net of purchased power and fuel expense.

Electric and gas revenues and purchased power and fuel expense are also affected by fluctuations in participation in the customer choice program. All PECO customers have the choice to purchase electricity and gas from competitive electric generation and natural gas suppliers, respectively. The customer’s choice of suppliers does not impact the volume of deliveries, but affects revenue collected from customers related to supplied electricity and natural gas service. Customer choice program activity has no impact on electric and gas revenue net of purchased power and fuel expense. The number of retail customers purchasing electricity from a competitive electric generation supplier was 517,000 and 416,600 at March 31, 2013 and 2012, respectively. Retail deliveries purchased from competitive electric generation suppliers represented 65% and 64% of PECO’s retail kWh sales for the three months ended March 31, 2013 and 2012, respectively. The number of retail customers purchasing natural gas from a competitive natural gas supplier was 57,600 and 34,900 at March 31, 2013 and 2012, respectively. Retail deliveries purchased from competitive natural gas suppliers represented 18% and 13% of PECO’s retail mmcf sales for the three months ended March 31, 2013 and 2012, respectively.

The changes in PECO’s operating revenues net of purchased power and fuel expense for the three months ended March 31, 2013 compared to the same period in 2012, consisted of the following:

|  | Increase (Decrease) Electric | Gas | Total |
| --- | ---: | ---: | ---: |
| Weather | $18 | $22 | $40 |
| Pricing | (8) | (3) | (11) |
| Regulatory required programs | (2) | — | (2) |
| Other | (2) | — | (2) |
| Total increase | $6 | $19 | $25 |

*Weather.* The demand for electricity and gas is affected by weather conditions. With respect to the electric business, very warm weather in summer months and, with respect to the electric and gas businesses, very cold weather in winter months are referred to as “favorable weather conditions” because these weather conditions result in increased deliveries of electricity and gas. Conversely, mild weather reduces demand. Operating revenues net of purchased power and fuel expense were higher due to the impact of favorable weather conditions during 2013 in PECO’s service territory.

Heating and cooling degree days are quantitative indices that reflect the demand for energy needed to heat or cool a home or business. Normal weather is determined based on historical average heating and cooling degree days for a 30-year period in PECO’s service territory. The changes in heating and cooling degree days in PECO’s service territory for the three months ended March 31, 2013 compared to the same period in 2012 consisted of the following:

| Heating and Cooling Degree-Days | 2013 | 2012 | Normal | % Change From 2012 | From Normal |
| --- | ---: | ---: | ---: | ---: | ---: |
| Heating Degree-Days | 2,440 | 1,914 | 2,476 | 27.5% | (1.5)% |
| Cooling Degree-Days | — | 4 | — | n/a% | n/a% |

*Pricing.* The decrease in electric revenues net of purchased power expense as a result of pricing reflected lower effective rates due to increased usage per customer across all customer classes. The decrease in gas revenue net of fuel expense as a result of pricing reflected the refund of the tax cash benefit resulting from the change in PECO’s method of accounting for gas distribution repairs in 2012. The refund was reflected on customer bills as a credit beginning January 1, 2013. The impact of the refund is completely offset by regulatory liability amortization recorded in income tax expense. See Note 5 of the Combined Notes to the Consolidated Financial Statements for further information.

*Regulatory Required Programs.* This represents the change in operating revenues collected under approved riders to recover costs incurred for regulatory programs such as smart meter, energy efficiency and the GSA. The riders are designed to provide full and current cost recovery as well as a return. The costs of these programs are included in operating and maintenance expense, depreciation and amortization expense and income taxes. Refer to the operating and maintenance expense discussion below for additional information on included programs.

*Other.* The decrease in other electric revenues net of purchased power expense for the three months ended March 31, 2013 compared to the same period in 2012 reflected a decrease in GRT revenue as a result of lower supplied energy service. There is an equal and offsetting decrease in GRT expense included in taxes other than income.

### Operating and Maintenance Expense

|  | Three Months Ended March 31, 2013 | 2012 | Increase (Decrease) |
| --- | ---: | ---: | ---: |
| Operating and Maintenance Expense — Baseline | $173 | $184 | $(11) |
| Operating and Maintenance Expense — Regulatory Required Programs(a) | 15 | 19 | (4) |
| Total Operating and Maintenance Expense | 188 | 203 | (15) |

(a) Operating and maintenance expenses for regulatory required programs are costs for various legislative and/or regulatory programs that are recoverable from customers on a full and current basis through approved regulated rates. An equal and offsetting amount has been reflected in operating revenues.

The changes in operating and maintenance expense for the three months ended March 31, 2013 compared to the same period in 2012, consisted of the following:

| Baseline | Increase (Decrease) |
| --- | ---: |
| Labor, other benefits, contracting and materials | $(4) |
| Constellation merger and integration costs | (4) |
| Pension and non-pension postretirement benefits expense | (3) |
|  | (11) |
| Regulatory Required Programs |  |
| Energy Efficiency | (4) |
|  | (4) |
| Decrease in operating and maintenance expense | $(15) |

### Depreciation and Amortization

The increase in depreciation and amortization expense for the three months ended March 31, 2013 compared to the same period in 2012 was primarily due ongoing capital expenditures.

### Taxes Other Than Income

Taxes other than income increased for the three months ended March 31, 2013 compared to the same period in 2012 primarily due to a favorable sales and use tax reserve adjustment resulting from the completion of the audit of tax years 2005 through 2010 recorded in the first quarter of 2012.

### Interest Expense, Net

The decrease in interest expense, net for the three months ended March 31, 2013 compared to the same period in 2012 was primarily due to lower interest expense as a result of refinancing debt retired in 2012 at lower interest rates during the second half of 2012.

### Other, Net

Other, net for the three months ended March 31, 2013 remained relatively level compared to the same period in 2012.

### Effective Income Tax Rate

PECO’s effective income tax rate was 31.1% for the three months ended March 31, 2013 as compared to 34.5% for the same period during 2012. See Note 11 of the Combined Notes to the Consolidated Financial Statements for further discussion of the change in effective income tax rate.

### PECO Electric Operating Statistics and Revenue Detail

PECO’s electric sales statistics and revenue detail were as follows:

| Retail Deliveries to customers (in GWhs) Retail Deliveries and Sales(a) | Three Months Ended March 31, 2013 | 2012 | % Change | Weather- Normal % Change |
| --- | ---: | ---: | ---: | ---: |
| Residential | 3,465 | 3,166 | 9.4% | 0.5% |
| Small commercial & industrial | 2,009 | 1,951 | 3.0% | (4.5)% |
| Large commercial & industrial | 3,646 | 3,637 | 0.2% | 1.5% |
| Public authorities & electric railroads | 255 | 237 | 7.6% | 7.6% |
| **Total Electric Retail** | 9,375 | 8,991 | 4.3% | —% |
|  | **As of March 31,** |  |  |  |
| **Number of Electric Customers** | **2013** | **2012** |  |  |
| Residential | 1,423,333 | 1,420,734 |  |  |
| Small commercial & industrial | 148,749 | 148,756 |  |  |
| Large commercial & industrial | 3,117 | 3,109 |  |  |
| Public authorities & electric railroads | 9,657 | 9,688 |  |  |
| Total | 1,584,856 | 1,582,287 |  |  |

170

| Electric Revenue Retail Deliveries and Sales(a) | Three Months Ended March 31, 2013 | 2012 | % Change |
| --- | ---: | ---: | ---: |
| Residential | $395 | $407 | (2.9)% |
| Small commercial & industrial | 106 | 118 | (10.2)% |
| Large commercial & industrial | 59 | 54 | 9.3% |
| Public authorities & electric railroads | 8 | 8 | —% |
| Total Electric Retail | 568 | 587 | (3.2)% |
| Other revenue(b) | 55 | 56 | (1.8)% |
| **Total Electric Revenues** | $623 | $643 | (3.1)% |

(a) Reflects delivery volumes and revenues from customers purchasing electricity directly from PECO and customers purchasing electricity directly from a competitive electric generation supplier as all customers are assessed distribution charges. For customers purchasing electricity from PECO, revenue also reflects the cost of energy and transmission.

(b) Other revenue includes transmission revenue from PJM and wholesale electric revenues.

### PECO Gas Sales Statistics and Revenue Detail

PECO’s gas sales statistics and revenue detail were as follows:

| Deliveries to customers (in mmcf) Retail Deliveries and Sales | Three Months Ended March 31, 2013 | 2012 | % Change | Weather-Normal % Change |
| --- | ---: | ---: | ---: | ---: |
| Retail sales(a) | 28,438 | 22,427 | 26.8% | (0.4)% |
| Transportation and other | 8,883 | 7,766 | 14.4% | 10.9% |
| **Total Gas Deliveries** | 37,321 | 30,193 | 23.6% | 2.0% |
|  | **As of March 31,** |  |  |  |
| **Number of Gas Customers** | **2013** | **2012** |  |  |
| Residential | 455,979 | 452,800 |  |  |
| Commercial & industrial | 41,972 | 41,577 |  |  |
| Total Retail | 497,951 | 494,377 |  |  |
| Transportation | 904 | 888 |  |  |
| Total | 498,855 | 495,265 |  |  |
|  | **Three Months Ended March 31,** |  |  |  |
| **Gas revenue** | **2013** | **2012** | **% Change** |  |
| Retail sales | $260 | $222 | 17.1% |  |
| Transportation and other | 12 | 10 | 20.0% |  |
| **Total Gas Revenue** | $272 | $232 | 17.2% |  |

(a) Reflects delivery volumes and revenues from customers purchasing natural gas directly from PECO and customers purchasing natural gas directly from a competitive natural gas supplier as all customers are assessed distribution charges. The cost of natural gas is charged to customers purchasing natural gas from PECO.

### Results of Operations — BGE

|  | Three Months Ended March 31, 2013 | 2012 | Favorable (Unfavorable) Variance |
| --- | ---: | ---: | ---: |
| **Operating revenues** | $880 | $697 | $183 |
| **Purchased power and fuel expense** | 426 | 385 | (41) |
| **Revenue net of purchased power and fuel expense(a)** | 454 | 312 | 142 |
| **Other operating expenses** |  |  |  |
| Operating and maintenance | 143 | 196 | 53 |
| Depreciation and amortization | 93 | 79 | (14) |
| Taxes other than income | 55 | 48 | (7) |
| Total other operating expenses | 291 | 323 | 32 |
| **Operating income (loss)** | 163 | (11) | 174 |
| **Other income and (deductions)** |  |  |  |
| Interest expense, net | (33) | (41) | 8 |
| Other, net | 5 | 6 | (1) |
| Total other income and (deductions) | (28) | (35) | 7 |
| **Income (Loss) before income taxes** | 135 | (46) | 181 |
| **Income taxes** | 55 | (16) | (71) |
| **Net income (loss)** | 80 | (30) | 110 |
| Preference stock dividends | 3 | 3 | — |
| **Net income (loss) on common stock** | $77 | $(33) | $110 |

(a) BGE evaluates its operating performance using the measures of revenue net of purchased power expense for electric sales and revenue net of fuel expense for gas sales. BGE believes revenue net of purchased power and fuel expense are useful measurements of its performance because they provide information that can be used to evaluate its net revenue from operations. BGE has included the analysis below as a complement to the financial information provided in accordance with GAAP. However, revenue net of purchased power and fuel expense figures are not a presentation defined under GAAP and may not be comparable to other companies’ presentations or more useful than the GAAP information provided elsewhere in this report.

### Net Income (Loss)

The increase in net income was driven primarily by decreased operating revenue net of purchased power and fuel expense in 2012 related to the accrual of the residential customer rate credit provided as a condition of the MDPSC’s approval of Exelon’s merger with Constellation. The increase in net income was also driven by increased operating and maintenance expenses in 2012, primarily related to BGE’s accrual of its portion of the charitable contributions to be provided as a condition of the MDPSC’s approval of the merger.

### Operating Revenues, Purchased Power and Fuel Expense

There are certain drivers to operating revenue that are offset by their impact on purchased power expense and fuel expense, such as commodity procurement costs and programs allowing customers to select a competitive electric or natural gas supplier. Electric and gas revenues and purchased power and fuel expense are affected by fluctuations in commodity procurement costs. BGE’s electric and natural gas rates charged to customers are subject to periodic adjustments that are designed to recover or refund the difference between the actual cost of purchased electric power and purchased natural gas and the amount included in rates in accordance with the MDPSC’s market-based SOS and gas commodity programs, respectively.

The number of customers electing to select a competitive electric supplier affects electric SOS revenues and purchased power expense. The number of customers electing to select a competitive natural gas supplier affects gas cost adjustment revenues and purchased natural gas expense. All BGE customers have the choice to purchase energy from a competitive electric supplier. This customer choice of electric suppliers does not impact the volume of deliveries, but affects revenue collected from customers related to SOS. The number of retail customers purchasing electricity from a competitive electric supplier was 375,400 and 320,800 at March 31, 2013 and 2012, respectively, representing 30% and 26% of total retail customers, respectively. Retail deliveries purchased from competitive electric suppliers represented 59% of BGE’s retail kWh sales for the three months ended March 31, 2013 and 2012. The number of retail customers purchasing natural gas from a competitive natural gas supplier was 152,800 and 118,200 at March 31, 2013 and 2012, respectively, representing 23% and 18% of total retail customers, respectively. Retail deliveries purchased from competitive natural gas suppliers represented 47% and 49% of BGE’s retail mmcf sales for the three months ended March 31, 2013 and 2012, respectively.

The changes in BGE’s operating revenues net of purchased power and fuel expense for the three months ended March 31, 2013 compared to the same period in 2012, consisted of the following:

|  | Increase (Decrease) Electric | Gas | Total |
| --- | ---: | ---: | ---: |
| Residential customer rate credit(a) | $82 | $31 | $113 |
| Regulatory required programs | 11 | 4 | 15 |
| Distribution rates increase | 6 | 3 | 9 |
| Other | 5 | — | 5 |
| Total increase | $104 | $38 | $142 |

(a) In accordance with the MDPSC order approving Exelon’s merger with Constellation, the residential customer rate credit is not recoverable from BGE’s customers. Exelon made a $66 million equity contribution to BGE in the second quarter of 2012 to fund the after-tax amount of the rate credit as directed in the MDPSC order approving the merger transaction.

*Revenue Decoupling.* The demand for electricity and gas is affected by weather and usage conditions. The MDPSC has allowed BGE to record a monthly adjustment to its electric and gas distribution revenues from all residential customers, commercial electric customers, the majority of large industrial electric customers, and all firm service gas customers to eliminate the effect of abnormal weather and usage patterns per customer on BGE’s electric and gas distribution volumes, thereby recovering a specified dollar amount of distribution revenues per customer, by customer class, regardless of changes in consumption levels. This means BGE recognizes revenues at MDPSC-approved levels per customer, regardless of what actual distribution volumes were for a billing period. Therefore, while these revenues are affected by customer growth, they will not be affected by actual weather or usage conditions. BGE bills or credits affected customers in subsequent months for the difference between approved revenue levels under revenue decoupling and actual customer billings.

*Volume.* Heating degree days are quantitative indices that reflect the demand for energy needed to heat a home or business. Normal weather is determined based on historical average heating and cooling degree days for a 30-year period in BGE’s service territory. The changes in heating degree days in BGE’s service territory for the three months ended March 31, 2013 compared to the same period in 2012 consisted of the following:

| Heating Degree-Days | 2013 | 2012 | Normal | % Change From 2012 | From Normal |
| --- | ---: | ---: | ---: | ---: | ---: |
| Heating Degree-Days | 2,451 | 1,874 | 2,384 | 30.8% | 2.8% |
| Cooling Degree-Days | 1 | 10 | — | (90.0)% | n.m. |

*Residential Customer Rate Credit.* The residential customer rate credit provided in 2012 as a result of the MDPSC’s order approving Exelon’s merger with Constellation decreased operating revenues net of purchased power and fuel expense compared to the same period in 2013.

*Regulatory Required Programs.* This represents the change in revenues collected under approved riders to recover costs incurred for the energy efficiency and demand response programs as well as administrative and commercial and industrial customer bad debt costs for SOS. The riders are designed to provide full recovery, as well as a return in certain instances. The costs of these programs are included in operating and maintenance expense, depreciation and amortization expense and taxes other than income taxes. The increase in revenues during the three months ended March 31, 2013 compared to the same period in 2012 was primarily due to the recovery of higher energy efficiency program costs.

*Distribution Rates Increase.* The MDPSC issued an order approving an increase in BGE’s annual electric and gas distribution revenue requirement. The increase in electric and gas distribution rates became effective for services rendered on or after February 23, 2013, resulting in higher revenues for the three months ended March 31, 2013 compared to the same period in 2012. See Note 5 of the Combined Notes to the Consolidated Financial Statements for additional information.

*Other.* Other revenues increased during the three months ended March 31, 2013 compared to the same period in 2012. Other revenues, which can vary from period to period, include off-system revenues and other miscellaneous revenues such as late payment charge revenues and all other base distribution revenues, which increased due to higher volumes and customer mix.

### Operating and Maintenance Expense

|  | Three Months Ended March 31, 2013 | 2012 | Increase (Decrease) |
| --- | ---: | ---: | ---: |
| Operating and Maintenance Expense — Baseline | $143 | $196 | $(53) |
| Operating and Maintenance Expense — Regulatory Required Programs(a) | — | — | — |
| Total Operating and Maintenance Expense | 143 | 196 | (53) |

(a) Operating and maintenance expenses for regulatory required programs are costs for various legislative and/or regulatory programs that are recoverable from customers on a full and current basis through approved regulated rates. An equal and offsetting amount has been reflected in operating revenues.

The changes in baseline operating and maintenance expense for the three months ended March 31, 2013 compared to the same period in 2012, consisted of the following:

| Baseline | Increase (Decrease) |
| --- | ---: |
| Charitable contributions accrual(a) | $(28) |
| Labor, other benefits, contracting and materials | (11) |
| Merger transaction costs(b) | (8) |
| Storm-related costs | 8 |
| Other | (14) |
|  | (53) |
| Regulatory Required Programs |  |
| SOS | — |
| Decrease in operating and maintenance expense | $(53) |

(a) In accordance with the MDPSC order approving Exelon’s merger with Constellation, the charitable contribution accrual is not recoverable from BGE’s customers.

(b) BGE established a regulatory asset of $6 million at March 31, 2013 for certain 2012 other merger integration costs as part of the 2013 electric and gas distribution rate case order.

### Depreciation and Amortization

The increase in depreciation and amortization expense for the three months ended March 31, 2013 compared to the same period in 2012 was primarily due to increased amortization expense related to energy efficiency and demand response programs, which is fully offset in revenues, and higher plant balances.

### Taxes Other Than Income

Taxes other than income increased for the three months ended March 31, 2013 compared to the same period in 2012 primarily due to increased gross receipts tax as a result of higher revenues.

### Interest Expense, Net

The decrease in interest expense, net for the three months ended March 31, 2013 compared to the same period in 2012 was primarily due to interest recorded in 2012 on prior year tax liabilities and more favorable interest rates in 2013 on long-term debt balances.

### Effective Income Tax Rate

BGE’s effective income tax rate was 40.7% for the three months ended March 31, 2013 as compared to 34.8% for the same period during 2012. See Note 11 of the Combined Notes to Consolidated Financial Statements for further discussion of the change in effective income tax rate.

### BGE Electric Operating Statistics and Revenue Detail

BGE’s electric sales statistics and revenue detail were as follows:

| Retail Deliveries to customers (in GWhs) Retail Deliveries and Sales(a) | Three Months Ended March 31, 2013 | 2012 | % Change | Weather-Normal % Change |
| --- | ---: | ---: | ---: | --- |
| Residential | 3,536 | 3,201 | 10.5% | n.m. |
| Small commercial & industrial | 776 | 729 | 6.4% | n.m. |
| Large commercial & industrial | 3,554 | 3,639 | (2.3)% | n.m. |
| Public authorities & electric railroads | 82 | 88 | (6.8)% | n.m. |
| **Total Electric Retail** | 7,948 | 7,657 | 3.8% | n.m. |
|  | **As of March 31,** |  |  |  |
| **Number of Electric Customers** | **2013** | **2012** |  |  |
| Residential | 1,118,824 | 1,116,201 |  |  |
| Small commercial & industrial | 113,051 | 113,177 |  |  |
| Large commercial & industrial | 11,589 | 11,492 |  |  |
| Public authorities & electric railroads | 318 | 298 |  |  |
| Total | 1,243,782 | 1,241,168 |  |  |

175

| Electric Revenue Retail Deliveries and Sales(a) | Three Months Ended March 31, 2013 | 2012 | % Change |
| --- | ---: | ---: | ---: |
| Residential | $365 | $265 | 37.7% |
| Small commercial & industrial | 64 | 63 | 1.6% |
| Large commercial & industrial | 105 | 96 | 9.4% |
| Public authorities & electric railroads | 8 | 7 | 14.3% |
| Total Electric Retail | 542 | 431 | 25.8% |
| Other revenue | 63 | 43 | 46.5% |
| **Total Electric Revenues** | $605 | $474 | 27.6% |

(a) Reflects delivery volumes and revenues from customers purchasing electricity directly from BGE and customers electing to receive electric generation service from a competitive electric generation supplier as all customers are assessed distribution charges. For customers purchasing electricity from BGE, revenue also reflects the cost of energy and transmission.

### BGE Gas Sales Statistics and Revenue Detail

BGE’s gas sales statistics and revenue detail were as follows:

| Deliveries to customers (in mmcf) | Three Months Ended March 31, 2013 2012 | % Change | Weather-Normal % Change |
| --- | ---: | ---: | --- |
| Retail sales | 40,261 33,931 | 18.7% | n.m. |
| Transportation and other | 5,651 5,440 | 3.9% | n.m. |
| **Total Gas Deliveries** | 45,912 39,371 | 16.6% | n.m. |
|  | **As of March 31,** |  |  |
| **Number of Gas Customers** | **2013** **2012** |  |  |
| Residential | 612,065 610,612 |  |  |
| Commercial & industrial | 44,308 44,170 |  |  |
| Total | 656,373 654,782 |  |  |
|  | **Three Months Ended March 31,** | **% Change** |  |
| **Gas revenue** | **2013** **2012** |  |  |
| Retail sales | $246 $188 | 30.9% |  |
| Transportation and other(b) | 29 19 | 52.6% |  |
| **Total Gas Revenue** | $275 $207 | 32.9% |  |

(b) Transportation and other gas revenue includes off-system revenue of 5,651 mmcfs ($24 million) and 5,440 mmcfs ($17 million) for the three months ended March 31, 2013 and 2012.

### Liquidity and Capital Resources

Exelon and Generation prior year activity presented below includes the activity of Constellation, and BGE in the case of Exelon, from the merger effective date of March 12, 2012 through March 31, 2012. BGE prior year activity presented below includes its activity for the three months ended March 31, 2012.

The Registrants’ operating and capital expenditures requirements are provided by internally generated cash flows from operations as well as funds from external sources in the capital markets and through bank borrowings.

The Registrants’ businesses are capital intensive and require considerable capital resources. Each Registrant’s access to external financing on reasonable terms depends on its credit ratings and current overall capital market business conditions, including that of the utility industry in general. If these conditions deteriorate to the extent that the Registrants no longer have access to the capital markets at reasonable terms, Exelon, Generation, ComEd, PECO and BGE have access to unsecured revolving credit facilities with aggregate bank commitments of $0.5 billion, $5.3 billion, $1.0 billion, $0.6 billion and $0.6 billion, respectively. The Registrants’ revolving credit facilities expire between 2017 and 2018. In addition, Generation has $0.4 billion in bilateral facilities with banks. The bilateral facilities at Generation have expirations in January 2015, December 2015 and March 2016. The Registrants utilize their credit facilities to support their commercial paper programs, provide for other short-term borrowings and issue letters of credit. See the “Credit Matters” section below for further discussion. The Registrants expect cash flows to be sufficient to meet operating expenses, financing costs and capital expenditure requirements.

The Registrants primarily use their capital resources, including cash, to fund capital requirements, including construction expenditures, retire debt, pay dividends, fund pension and other postretirement benefit obligations and invest in new and existing ventures. The Registrants spend a significant amount of cash on capital improvements and construction projects that have a long-term return on investment. Additionally, ComEd, PECO and BGE operate in rate-regulated environments in which the amount of new investment recovery may be delayed or limited and where such recovery takes place over an extended period of time. See Note 10 of the Combined Notes to Consolidated Financial Statements for further discussion of the Registrants’ debt and credit agreements.

### Cash Flows from Operating Activities

#### General

Generation’s cash flows from operating activities primarily result from the sale of electric energy and energy-related products and services to customers. Generation’s future cash flows from operating activities may be affected by future demand for and market prices of energy and its ability to continue to produce and supply power at competitive costs as well as to obtain collections from customers.

ComEd’s, PECO’s and BGE’s cash flows from operating activities primarily result from the transmission and distribution of electricity and, in the case of PECO and BGE, gas distribution services. ComEd’s, PECO’s and BGE’s distribution services are provided to an established and diverse base of retail customers. ComEd’s, PECO’s and BGE’s future cash flows may be affected by the economy, weather conditions, future legislative initiatives, future regulatory proceedings with respect to their rates or operations, competitive suppliers, and their ability to achieve operating cost reductions.

See Notes 5 and 17 of the Combined Notes to Consolidated Financial Statements for further discussion of regulatory and legal proceedings and proposed legislation.

#### Pension and Other Postretirement Benefits

Management considers various factors when making pension funding decisions, including actuarially determined minimum contribution requirements under ERISA, contributions required to avoid benefit restrictions and at-risk status as defined by the Pension Protection Act of 2006, management of the pension obligation and regulatory implications. On July 6, 2012, President Obama signed into law the Moving Ahead for Progress in the Twenty-first Century Act, which contains a pension funding provision that results in lower pension contributions in the near term while increasing the premiums pension plans pay to the Pension Benefit Guaranty Corporation. Certain provisions of the law were applied in 2012 while others take effect in 2013. The estimated impacts of the law are reflected in the projected pension contributions below.

Exelon expects to contribute $255 million to its qualified pension plans in 2013, of which Generation, ComEd, PECO and BGE will contribute $113 million, $116 million, $11 million and $0 million, respectively.

Unlike the qualified pension plans, Exelon’s non-qualified pension plans are not funded. Exelon expects to make non-qualified pension plan benefit payments of $79 million in 2013, of which Generation, ComEd, PECO, and BGE will make payments of $6 million, $1 million, $1 million, and $2 million, respectively.

To the extent interest rates continue to decline or the pension plans do not earn the expected asset return rates, annual pension contribution requirements in future years could increase and such increases could be significant, especially in years 2015 and beyond. Additionally, the contribution could change if Exelon changes its pension funding strategy.

Unlike qualified pension plans, other postretirement plans are not subject to regulatory minimum contribution requirements. Exelon’s management considers several factors in determining the level of contributions to its other postretirement benefit plans, including levels of benefit claims paid and regulatory implications (amounts deemed prudent to meet regulator expectations and best assure continued recovery). In 2013, Exelon anticipates funding its other postretirement benefit plans based on the funding considerations discussed above, with the exception of those plans previously sponsored by Constellation and AmerGen, which remain unfunded. Exelon expects to make other postretirement benefit plan contributions, including benefit payments related to unfunded plans, of approximately $292 million in 2013, of which Generation, ComEd, PECO and BGE expect to contribute $117 million, $114 million, $22 million and $18 million, respectively.

#### Tax Matters

The Registrants’ future cash flows from operating activities may be affected by the following tax matters:

- Exelon expects to receive a Federal refund of approximately $310 million between 2013 and 2014 which will be paid to (from) ComEd, PECO, BGE and Generation of approximately $320 million, $25 million, $20 million, and ($15) million, respectively.
- Given the current economic environment, state and local governments are facing increasing financial challenges, which may increase the risk of additional income tax levies, property taxes and other taxes.

The following table provides a summary of the major items affecting Exelon’s cash flows from operations for the three months ended March 31, 2013 and 2012:

|  | Three Months Ended March 31, 2013 | 2012 | Variance |
| --- | ---: | ---: | ---: |
| Net income | $1 | $200 | $(199) |
| Add (subtract): |  |  |  |
| Non-cash operating activities(a) | 960 | 1,231 | (271) |
| Pension and other postretirement benefit contributions | (267) | (55) | (212) |
| Income taxes | 632 | 178 | 454 |
| Changes in working capital and other noncurrent assets and liabilities(b) | (278) | (800) | 522 |
| Option premiums paid, net | (3) | (100) | 97 |
| Counterparty collateral received (posted), net | (186) | 340 | (526) |
| Net cash flows provided by operations | $859 | $994 | $(135) |

(a) Represents depreciation, amortization and accretion, impairment of long-lived assets, mark-to-market gains and losses on derivative transactions, deferred income taxes, provision for uncollectible accounts, pension and other postretirement benefit expense, equity in losses of unconsolidated affiliates and investments, decommissioning-related items, stock compensation expense and other non-cash charges.

(b) Changes in working capital and other noncurrent assets and liabilities exclude the changes in commercial paper, income taxes and the current portion of long-term debt.

Cash flows provided by operations for the three months ended March 31, 2013 and 2012 by Registrant were as follows:

|  | Three Months Ended March 31, 2013 | 2012 |
| --- | ---: | ---: |
| Exelon | $859 | $994 |
| Generation | 506 | 795 |
| ComEd | 58 | 291 |
| PECO | 195 | 172 |
| BGE | 185 | 258 |

Changes in Exelon’s, Generation’s, ComEd’s, PECO’s and BGE’s cash flows from operations were generally consistent with changes in each Registrant’s respective results of operations, as adjusted by changes in working capital in the normal course of business. In addition, significant operating cash flow impacts for the Registrants for the three months ended March 31, 2013 and 2012 were as follows:

#### Generation

- During the three months ended March 31, 2013 and 2012, Generation had net (payments) receipts of counterparty collateral of $(203) million and $348 million, respectively. Net (payments) receipts during the three months ended March 31, 2013 and 2012 were primarily due to market conditions that resulted in changes to Generation’s net mark-to-market position. Depending upon whether Generation is in a net mark-to-market liability or asset position, collateral may be required to be posted with or collected from its counterparties. This collateral may be in various forms, such as cash, which may be obtained through the issuance of commercial paper, or letters of credit.
- During the three months ended March 31, 2013 and 2012, Generation had net payments of approximately $(3) million and $(100) million, respectively, related to purchases and sales of options. The level of option activity in a given period may vary due to several factors, including changes in market conditions as well as changes in hedging strategy.

#### ComEd

- During the three months ended March 31, 2013 and 2012, ComEd’s net payables to Generation for energy purchases related to its supplier forward contract, ICC-approved RFP contracts and financial swap contract settlements (decreased) increased by $(11) million and $6 million, respectively. During the three months ended March 31, 2013 and 2012, ComEd’s payables to other energy suppliers for energy purchases increased (decreased) by $24 million and $(16) million, respectively.
- During the three months ended March 31, 2013 and 2012, ComEd received $17 million and posted $8 million, respectively, of incremental cash collateral from PJM. ComEd’s collateral posted with PJM has decreased due to lower PJM billings resulting from lower load being served by ComEd due to increased switching activity primarily driven by municipal aggregation. As of March 31, 2013 and 2012, ComEd had $36 million and $98 million, respectively, of collateral posted with PJM.

#### PECO

- During the three months ended March 31, 2013 and 2012, PECO’s payables to Generation for energy purchases (decreased) increased by $(56) million and $8 million, respectively, and payables to other electric and gas suppliers for energy purchases increased (decreased) by $12 million and $(30) million, respectively.

#### BGE

- During the three months ended March 31, 2013 and 2012, BGE’s payables to Generation for energy purchases increased by $5 million and increased by $3 million, respectively, and payables to other electric and gas suppliers for energy purchases increased by $17 million and $1 million, respectively.

### Cash Flows from Investing Activities

Cash flows used in investing activities for the three months ended March 31, 2013 and 2012 by Registrant were as follows:

|  | Three Months Ended March 31, 2013 | 2012 |
| --- | ---: | ---: |
| Exelon | $(1,471) | $(640) |
| Generation | (865) | (471) |
| ComEd | (336) | (280) |
| PECO | (171) | (130) |
| BGE | (154) | (146) |

Capital expenditures by Registrant for the three months ended March 31, 2013 and 2012 and projected amounts for the full year 2013 are as follows:

|  | Projected Full Year 2013(e) 2013 | Three Months Ended March 31, 2012 |  |
| --- | ---: | ---: | ---: |
| Exelon | $5,400 | $1,447 | $1,496 |
| Generation(a) | 2,725 | 841 | 1,055 |
| ComEd(b) | 1,400 | 346 | 291 |
| PECO | 575 | 122 | 96 |
| BGE(d) | 675 | 134 | 130 |
| Other(c) | 25 | 4 | 20 |

(a) Includes nuclear fuel.

(b) The projected capital expenditures include approximately $227 million of expected incremental spending. Pursuant to EIMA, ComEd has committed to invest approximately $2.6 billion over a ten year period to modernize and storm-harden its distribution system and to implement smart grid technology. ComEd filed an updated investment plan with the ICC on April 1, 2013. ComEd’s projected expenditures do not reflect the projected impact of Senate Bill 9. See “Exelon Corporation — Executive Overview,” for more information.

(c) Other primarily consists of corporate operations and BSC.

(d) The projected capital expenditures include those incurred prior to the merger on March 12, 2012.

(e) Total projected capital expenditures do not include adjustments for non-cash activity.

Projected capital expenditures and other investments are subject to periodic review and revision to reflect changes in economic conditions and other factors.

#### Generation

Approximately 37% and 21% of the projected 2013 capital expenditures at Generation are for the acquisition of nuclear fuel, and investments in renewable energy generation, including Antelope Valley construction costs, respectively, with the remaining amounts reflecting additions and upgrades to existing facilities (including material condition improvements during nuclear refueling outages). Also included in the projected 2013 capital expenditures are a portion of the costs of a series of planned power uprates across Generation’s nuclear fleet, which reflects the cancellation of certain nuclear power uprate projects in 2013. See “EXELON CORPORATION — Executive Overview,” for more information on nuclear uprates.

#### ComEd, PECO and BGE

Approximately 89%, 89% and 77% of the projected 2013 capital expenditures at ComEd, PECO and BGE, respectively, are for continuing projects to maintain and improve operations, including enhancing reliability and adding capacity to the transmission and distribution systems such as ComEd’s reliability related investments required under EIMA, and ComEd’s, PECO’s and BGE’s construction commitments under PJM’s RTEP. ComEd’s capital expenditures includes smart grid/smart meter technology required under EIMA and for PECO and BGE capital expenditures related to its smart meter program and SGIG project, net of DOE expected reimbursements. The remaining amounts are for capital additions to support new business and customer growth.

In 2010, NERC provided guidance to transmission owners that recommends ComEd, PECO and BGE perform assessments of all their transmission lines, with the highest priority lines assessed by December 31, 2011, medium priority lines by December 31, 2012, and the lowest priority lines by December 31, 2013. In compliance with this guidance, ComEd, PECO and BGE submitted their most recent bi-annual reports to NERC in January 2013. ComEd, PECO and BGE will be incurring incremental capital expenditures associated with this guidance following the completion of the assessments. Specific projects and expenditures are identified as the assessments are completed. ComEd’s, PECO’s and BGE’s forecasted 2013 capital expenditures above reflect capital spending for remediation to be completed in 2013.

ComEd, PECO and BGE anticipate that they will fund their capital expenditures with internally generated funds and borrowings, including ComEd’s capital expenditures associated with EIMA as further discussed in Note 5 of the Combined Notes to Consolidated Financial Statements.

### Cash Flows from Financing Activities

Cash flows provided by (used in) financing activities for the three months ended March 31, 2013 and 2012 by Registrant were as follows:

|  | Three Months Ended March 31, 2013 | 2012 |
| --- | ---: | ---: |
| Exelon | $(102) | $(649) |
| Generation | (87) | (601) |
| ComEd | 164 | (226) |
| PECO | (84) | (88) |
| BGE | (5) | (4) |

#### Debt

See Note 10 of the Combined Notes to Consolidated Financial Statements for further details of the Registrants’ debt issuances and retirements.

#### Dividends

Cash dividend payments and distributions during the three months ended March 31, 2013 and 2012 by Registrant were as follows:

|  | Three Months Ended March 31, 2013 | 2012 |
| --- | ---: | ---: |
| Exelon | $450 | $350 |
| Generation | 211 | 600 |
| ComEd | 55 | 75 |
| PECO | 84 | 88 |
| BGE(a) | 3 | 3 |

(a) Relates to dividends paid on BGE’s preference stock.

#### First Quarter 2013 Dividend

On February 6, 2013, the Exelon Board of Directors declared a regular quarterly dividend, paid on March 8, 2013 of $0.525 per share on Exelon’s common stock.

#### Revised Dividend Policy

On February 6, 2013, the Exelon Board of Directors approved a revised dividend policy which contemplates a regular $0.31 per share quarterly dividend on Exelon’s common stock payable beginning in the second quarter of 2013 (or $1.24 per share on an annualized basis), subject to quarterly declarations by the Exelon Board of Directors. The second quarter 2013 quarterly dividend of $0.31 per share on Exelon’s common stock was approved by the Exelon Board of Directors on April 23, 2013 and will be paid during the second quarter.

#### Short-Term Borrowings

During the three months ended March 31, 2013, ComEd issued $220 million of commercial paper and Generation issued $13 million in short-term notes payable. During the three months ended March 31, 2012, Exelon repaid $161 million of outstanding commercial paper and ComEd issued $302 million of commercial paper.

#### Contributions from Parent/Member

During the three months ended March 31, 2013 and March 31, 2012, there were no contributions from Parent/Member (Exelon).

#### Other

For the three months ended March 31, 2013, other financing activities primarily consists of expenses paid related to the replacement of the Registrants’ credit facilities. See Note 10 of the Combined Notes to Consolidated Financial Statements for additional information.

### Credit Matters

The Registrants fund liquidity needs for capital investment, working capital, energy hedging and other financial commitments through cash flows from continuing operations, public debt offerings, commercial paper markets and large, diversified credit facilities. The credit facilities include $8.4 billion in aggregate total commitments of which $6.7 billion was available as of March 31, 2013, and of which no financial institution has more than 8% of the aggregate commitments. Exelon, Generation, ComEd, PECO and BGE had access to the commercial paper market during the first quarter of 2013 to fund their short-term liquidity needs, when necessary. The Registrants routinely review the sufficiency of their liquidity position, including appropriate sizing of credit facility commitments, by performing various stress test scenarios, such as commodity price movements, increases in margin-related transactions, changes in hedging levels and the impacts of hypothetical credit downgrades. The Registrants have continued to closely monitor events in the financial markets and the financial institutions associated with the credit facilities, including monitoring credit ratings and outlooks, credit default swap levels, capital raising and merger activity. See PART I. ITEM 1A. RISK FACTORS of Exelon’s 2012 Annual Report on Form 10-K for further information regarding the effects of uncertainty in the capital and credit markets or significant bank failures.

The Registrants believe their cash flow from operating activities, access to credit markets and their credit facilities provide sufficient liquidity. If Generation lost its investment grade credit rating as of March 31, 2013, it would have been required to provide incremental collateral of $1,747 million, which is well within its current available credit facility capacities of $4.2 billion, which includes $1,747 million of collateral obligations for derivatives, non-derivatives, normal purchase normal sales contracts and applicable payables and receivables, net of the contractual right of offset under master netting agreements. If ComEd lost its investment grade credit rating as of March 31, 2013, it would have been required to provide incremental collateral of $111 million, which is well within its current available credit facility capacity of $780 million, which takes into account commercial paper borrowings as of March 31, 2013. If PECO lost its investment grade credit rating as of March 31, 2013, it would be required to provide collateral of $1 million pursuant to PJM’s credit policy and could have been required to provide collateral of $36 million related to its natural gas procurement contracts, which, in the aggregate, are well within PECO’s current available credit facility capacity of $599 million. If BGE lost its investment grade credit rating as of March 31, 2013, it would have been required to provide collateral of $3 million pursuant to PJM’s credit policy and could have been required to provide collateral of $127 million related to its natural gas procurement contracts, which, in the aggregate, are well within BGE’s current available credit facility capacity of $600 million.

### Exelon Credit Facilities

Exelon, ComEd and BGE meet their short-term liquidity requirements primarily through the issuance of commercial paper. Generation and PECO meet their short-term liquidity requirements primarily through the issuance of commercial paper and borrowings from the intercompany money pool. The Registrants may use their respective credit facilities for general corporate purposes, including meeting short-term funding requirements and the issuance of letters of credit. See Note 10 of the Combined Notes to the Consolidated Financial Statements for further information regarding the Registrants’ credit facilities.

The following table reflects the Registrants’ commercial paper programs supported by the revolving credit agreements and bilateral credit agreements at March 31, 2013:

### Commercial Paper Programs

| Commercial Paper Issuer | Maximum Program Size | Outstanding Commercial Paper at March 31, 2013 | Average Interest Rate on Commercial Paper Borrowings for the three months ended March 31, 2013 |
| --- | ---: | ---: | ---: |
| Exelon Corporate | $500 | $— | — |
| Generation | 5,600 | — | — |
| ComEd | 1,000 | 220 | 0.39% |
| PECO | 600 | — | — |
| BGE | 600 | — | — |

In order to maintain their respective commercial paper programs in the amounts indicated above, each Registrant must have credit facilities in place, at least equal to the amount of its commercial paper program. While the amount of its commercial paper outstanding does not reduce available capacity under a Registrant’s credit agreement, a Registrant does not issue commercial paper in an aggregate amount exceeding the available capacity under its credit agreement.

### Credit Agreements

| Borrower | Facility Type | Aggregate Bank Commitment(a) | Facility Draws | Outstanding Letters of Credit | Available Capacity at March 31, 2013 Actual | To Support Additional Commercial Paper |
| --- | --- | ---: | ---: | ---: | ---: | ---: |
| Exelon Corporate | Syndicated Revolver | $500 | $— | $2 | $498 | $498 |
| Generation | Syndicated Revolver | 5,300 | — | 1,124 | 4,176 | 4,176 |
| Generation | Bilaterals | 375 | — | 374 | 1 | 1 |
| ComEd | Syndicated Revolver | 1,000 | — | — | 1,000 | 780 |
| PECO | Syndicated Revolver | 600 | — | 1 | 599 | 599 |
| BGE | Syndicated Revolver | 600 | — | — | 600 | 600 |

(a) Excludes $123 million of credit facility agreements arranged with minority and community banks at Generation, ComEd, PECO and BGE. These facilities expire on October 19, 2013, and are solely utilized to issue letters of credit. See Note 10 of the Combined Notes to the Consolidated Financial Statements for further information.

On March 14, 2013, ComEd extended its unsecured revolving credit facility with aggregate bank commitments of $1.0 billion. Under this facility, ComEd may issue letters of credit in the aggregate amount of up to $500 million. The credit agreement expires on March 28, 2018, and ComEd may request another one-year extension of that term. The credit facility also allows ComEd to request increases in the aggregate commitments of up to an additional $500 million. Any such extension or increases are subject to the approval of the lenders party to the credit agreement in their sole discretion. Costs incurred to extend the facility for ComEd were not material.

Borrowings under Exelon Corporate’s, Generation’s, ComEd’s, PECO’s and BGE’s credit agreements bear interest at a rate based upon either the prime rate or a LIBOR-based rate, plus an adder based upon the registrants credit rating. Exelon Corporate, Generation, ComEd, PECO and BGE have adders of 27.5, 27.5, 27.5, 0.0 and 7.5 basis points for prime based borrowings and 127.5, 127.5, 127.5, 100.0 and 107.5 basis points for LIBOR-based borrowings. The maximum adders for prime rate borrowings and LIBOR-based rate borrowings are 65 basis points and 165 basis points, respectively. The credit agreement also requires each entity to pay a facility fee based upon the aggregate commitments under the agreement. The fee varies depending upon the respective credit ratings of each entity.

On January 23, 2013, Generation entered into a two year $75 million bilateral letter of credit facility with a bank. The credit agreement expires in January 2015. This facility will solely be utilized by Generation to issue letters of credit.

Each revolving credit agreement for Exelon, Generation, ComEd, PECO and BGE requires the affected borrower to maintain a minimum cash from operations to interest expense ratio for the twelve-month period ended on the last day of any quarter. The following table summarizes the minimum thresholds reflected in the credit agreements for the three months ended March 31, 2013:

|  | Exelon | Generation | ComEd | PECO | BGE |
| --- | --- | --- | --- | --- | --- |
| Credit agreement threshold | 2.50 to 1 | 3.00 to 1 | 2.00 to 1 | 2.00 to 1 | 2.00 to 1 |

At March 31, 2013, the interest coverage ratios at the Registrants were as follows:

|  | Exelon | Generation | ComEd | PECO | BGE |
| --- | ---: | ---: | ---: | ---: | ---: |
| Interest coverage ratio | 7.89 | 13.67 | 2.76 | 8.52 | 5.56 |

An event of default under any Registrant’s credit facility will not constitute an event of default under any of the other Registrants’ credit facilities, except that a bankruptcy or other event of default in the payment of principal, premium or indebtedness in principal amount in excess of $100 million in the aggregate by Generation under its credit facility will constitute an event of default under the Exelon corporate credit facility.

### Security Ratings

The Registrants’ access to the capital markets, including the commercial paper market, and their respective financing costs in those markets, may depend on the securities ratings of the entity that is accessing the capital markets.

The Registrants’ borrowings are not subject to default or prepayment as a result of a downgrading of securities, although such a downgrading of a Registrant’s securities could increase fees and interest charges under that Registrant’s credit agreements.

As part of the normal course of business, the Registrants enter into contracts that contain express provisions or otherwise permit the Registrants and their counterparties to demand adequate assurance of future performance when there are reasonable grounds for doing so. In accordance with the contracts and applicable contracts law, if the Registrants are downgraded by a credit rating agency, it is possible that a counterparty would attempt to rely on such a downgrade as a basis for making a demand for adequate assurance of future performance, which could include the posting of collateral. See Note 9 of the Combined Notes to Consolidated Financial Statements for additional information on collateral provisions.

### Intercompany Money Pool

To provide an additional short-term borrowing option that will generally be more favorable to the borrowing participants than the cost of external financing, Exelon operates an intercompany money pool. Maximum amounts contributed to and borrowed from the money pool by participant during the three months ended March 31, 2013, in addition to the net contribution or borrowing as of March 31, 2013, are presented in the following table:

| Contributed (borrowed) as of March 31, 2013 | Maximum Contributed | Maximum Borrowed | Contributed (Borrowed) |
| --- | ---: | ---: | ---: |
| Generation | $— | $110 | $— |
| PECO | 110 | — | 50 |
| BSC | — | 194 | (138) |
| Exelon Corporate | 194 | N/A | 88 |

### Investments in Nuclear Decommissioning Trust Funds

Exelon and Generation maintain trust funds, as required by the NRC, to fund certain costs of decommissioning Generation’s nuclear plants. The mix of securities in the trust funds is designed to provide returns to be used to fund decommissioning and to offset inflationary increases in decommissioning costs. Generation actively monitors the investment performance of the trust funds and periodically reviews asset allocations in accordance with Generation’s NDT fund investment policy. Generation’s investment policy establishes limits on the concentration of holdings in any one company and also in any one industry. See Note 12 of the Combined Notes to Consolidated Financial Statements for further information regarding the trust funds, the NRC’s minimum funding requirements and related liquidity ramifications.

### Shelf Registration Statements

On May 29, 2012, the Registrants filed a combined shelf registration statement unlimited in amount, with the SEC, which became immediately effective. As of March 31, 2013, Exelon, Generation, ComEd, PECO and BGE each had a current shelf registration statement effective with the SEC that provides for the sale of unspecified amounts of securities. The ability of each Registrant to sell securities off its shelf registration statement or to access the private placement markets will depend on a number of factors at the time of the proposed sale, including other required regulatory approvals, as applicable, the current financial condition of the Registrant, its securities ratings and market conditions.

### Regulatory Authorizations

On March 1, 2013, ComEd received $470 million in long-term debt new money authority from the ICC and on February 27, 2012, ComEd received $1.3 billion in long-term debt refinancing authority from the ICC. As of March 31, 2013, ComEd had $1.4 billion available in long-term debt refinancing authority and $576 million available in new money long-term debt financing authority from the ICC. As of March 31, 2013, PECO had $1.9 billion available in long-term debt financing authority from the PAPUC. As of March 31, 2013, BGE had $1.2 billion available in long-term financing authority from MDPSC.

As of March 31, 2013, ComEd and PECO had short-term financing authority from FERC, which expires on December 31, 2013, of $2.5 billion and $1.5 billion, respectively. BGE had short-term financing authority from FERC, which expires December 31, 2014, of $0.7 billion. Generation currently has blanket financing authority it received from FERC in connection with its market-based rate authority.

### Contractual Obligations and Off-Balance Sheet Arrangements

Contractual obligations represent cash obligations that are considered to be firm commitments and commercial commitments triggered by future events. See Note 17 of the Combined Notes to Consolidated Financial Statements for discussion of the Registrants’ commitments.

Generation, ComEd, PECO and BGE have obligations related to contracts for the purchase of power and fuel supplies, and ComEd, PECO and BGE have obligations related to their financing trusts. The power and fuel purchase contracts and the financing trusts have been considered for consolidation in the Registrants’ respective financial statements pursuant to the authoritative guidance for VIEs. See Note 1 of the Combined Notes to Consolidated Financial Statements for further information.

For an in-depth discussion of the Registrant’s contractual obligations and off-balance sheet arrangements, see “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Contractual Obligations and Off-Balance Sheet Arrangements” in the Exelon 2012 Form 10-K.

## Market risk

As filed, 32,828 characters.

The Registrants are exposed to market risks associated with adverse changes in commodity prices, counterparty credit, interest rates and equity prices. Exelon’s RMC approves risk management policies and objectives for risk assessment, control and valuation, counterparty credit approval, and the monitoring and reporting of risk exposures. The RMC is chaired by the chief risk officer and includes the chief executive officer, chief financial officer, corporate controller, general counsel, treasurer, vice president of strategy, vice president of audit services and officers representing Exelon’s business units. The RMC reports to the Risk Oversight Committee of the Exelon Board of Directors on the scope of the risk management activities. The following discussion serves as an update to ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK of the Registrants’ 2012 Annual Report on Form 10-K incorporated herein by reference.

### Commodity Price Risk (Exelon, Generation, ComEd, PECO and BGE)

Commodity price risk is associated with price movements resulting from changes in supply and demand, fuel costs, market liquidity, weather conditions, governmental regulatory and environmental policies, and other factors. To the extent the amount of energy Exelon generates differs from the amount of energy it has contracted to sell, Exelon has price risk from commodity price movements. Exelon seeks to mitigate its commodity price risk through the sale and purchase of electricity, fossil fuel, and other commodities.

### Generation

***Normal Operations and Hedging Activities.*** Electricity available from Generation’s owned or contracted generation supply in excess of Generation’s obligations to customers, including portions of ComEd’s, PECO’s and BGE’s retail load, is sold into the wholesale markets. To reduce price risk caused by market fluctuations, Generation enters into physical contracts as well as financial derivative contracts, including forwards, futures, swaps, and options, with approved counterparties to hedge anticipated exposures. Generation believes these instruments represent economic hedges that mitigate exposure to fluctuations in commodity prices. Generation expects the settlement of the majority of its economic hedges, including the ComEd financial swap contract, will occur during 2013 through 2015. Generation’s energy contracts are accounted for under the accounting guidance for derivatives as further discussed in Note 9 of the Combined Notes to Consolidated Financial Statements.

In general, increases and decreases in forward market prices have a positive and negative impact, respectively, on Generation’s owned and contracted generation positions which have not been hedged. Generation hedges commodity risk on a ratable basis over the three years leading to the spot market. As of March 31, 2013, the percentage of expected generation hedged for the major reportable segments was 98%-101%, 70%-73% and 33%-36% for 2013, 2014 and 2015, respectively. The percentage of expected generation hedged is the amount of equivalent sales divided by the expected generation. Expected generation represents the amount of energy estimated to be generated or purchased through owned or contracted capacity. Equivalent sales represent all hedging products, which include economic hedges and certain non-derivative contracts including sales to ComEd, PECO and BGE to serve their retail load.

A portion of Generation’s hedging strategy may be accomplished with fuel products based on assumed correlations between power and fuel prices, which routinely change in the market. Market price risk exposure is the risk of a change in the value of unhedged positions. The forecasted market price risk exposure for Generation’s entire non-trading portfolio associated with a $5 reduction in the annual average around-the-clock energy price based on March 31, 2013 market conditions and hedged position would be an increase in pre-tax income of approximately $20 million for 2013 and a decrease in pre-tax net income of approximately $360 million and $750 million, respectively, for 2014 and 2015. Power price sensitivities are derived by adjusting power price assumptions while keeping all other price inputs constant. Generation expects to actively manage its portfolio to mitigate market price risk exposure for its unhedged position. Actual results could differ depending on the specific timing of, and markets affected by, price changes, as well as future changes in Generation’s portfolio.

***Proprietary Trading Activities.*** Generation also enters into certain energy-related derivatives for proprietary trading purposes. Proprietary trading includes all contracts entered into with the intent of benefiting from shifts or changes in market prices as opposed to those entered into with the intent of hedging or managing risk. Proprietary trading activities are subject to limits established by Exelon’s RMC. The proprietary trading portfolio is subject to a risk management policy that includes stringent risk management limits, including volume, stop loss and Value-at-Risk (VaR) limits to manage exposure to market risk. Additionally, the Exelon risk management group and Exelon’s RMC monitor the financial risks of the proprietary trading activities. The proprietary trading activities, which included physical volumes of 1,572 GWhs and 1,757 GWhs for the three months ended March 31, 2013 and 2012, respectively, are a complement to Generation’s energy marketing portfolio, but represent a small portion of Generation’s overall revenue from energy marketing activities. Trading portfolio activity for the three months ended March 31, 2013 resulted in pre-tax gains of $9 million due to net mark-to-market gains of $2 million and realized gains of $7 million. Generation uses a 95% confidence interval, assuming standard normal distribution, one day holding period, one-tailed statistical measure in calculating its VaR. The daily VaR on proprietary trading activity averaged $1 million of exposure during the quarter. Because of the relative size of the proprietary trading portfolio in comparison to Generation’s total gross margin from continuing operations for the three months ended March 31, 2013 of $1,364 million, Generation has not segregated proprietary trading activity in the following tables.

***Fuel Procurement.*** Generation procures coal and natural gas through long-term and short-term contracts, and spot-market purchases. Nuclear fuel assemblies are obtained primarily through long-term contracts for uranium concentrates, and long-term contracts for conversion services, enrichment services and fuel fabrication services. The supply markets for coal, natural gas, uranium concentrates and certain nuclear fuel services are subject to price fluctuations and availability restrictions. Supply market conditions may make Generation’s procurement contracts subject to credit risk related to the potential non-performance of counterparties to deliver the contracted commodity or service at the contracted prices. Approximately 60% of Generation’s uranium concentrate requirements from 2013 through 2017 are supplied by three producers. In the event of non-performance by these or other suppliers, Generation believes that replacement uranium concentrates can be obtained, although at prices that may be unfavorable when compared to the prices under the current supply agreements. Non-performance by these counterparties could have a material impact on Exelon’s and Generation’s results of operations, cash flows and financial positions. See Note 17 of the Combined Notes to Consolidated Financial Statements for additional information regarding uranium and coal supply agreement matters.

### ComEd

The financial swap contract between Generation and ComEd was deemed prudent by the Illinois Settlement Legislation, thereby ensuring that ComEd will be entitled to receive full cost recovery in rates. The change in fair value each period is recorded by ComEd with an offset to a regulatory asset or liability. This financial swap contract between Generation and ComEd expires on May 31, 2013.

ComEd’s RFP contracts are deemed to be derivatives that qualify for the normal purchases and normal sales exception under derivative accounting guidance. ComEd does not enter into derivatives for speculative or trading purposes. ComEd is permitted full recovery of its RFP contracts from retail customers with no mark-up.

On December 17, 2010, ComEd entered into several 20-year floating-to-fixed energy swap contracts with unaffiliated suppliers regarding the procurement of long-term renewable energy and associated RECs. Because ComEd receives full cost recovery for energy procurement and related costs from retail customers, the change in fair value each period is recorded by ComEd as a regulatory asset or liability. See Notes 5 and 9 of the Combined Notes to Consolidated Financial Statements for additional information regarding energy procurement and derivatives.

### PECO

PECO has contracts to procure electric supply that were executed through the competitive procurement process outlined in its PAPUC-approved DSP Programs, which are further discussed in Note 5 of the Combined Notes to the Consolidated Financial Statements. PECO has certain full requirements contracts and block contracts that are considered derivatives and qualify for the normal purchases and normal sales scope exception under current derivative authoritative guidance. Under the DSP Programs, PECO is permitted to recover its electric supply procurement costs from retail customers with no mark-up.

PECO has also entered into derivative natural gas contracts, which either qualify for the normal purchases and normal sales exception or have no mark-to-market balances because the derivatives are index priced, to hedge its long-term price risk in the natural gas market. PECO’s hedging program for natural gas procurement has no direct impact on its financial position or results of operations as natural gas costs are fully recovered from customers under the PGC.

PECO does not enter into derivatives for speculative or proprietary trading purposes. For additional information on these contracts, see Note 9 of the Combined Notes to Consolidated Financial Statements.

### BGE

BGE procures electric supply for default service customers through full requirements contracts pursuant to BGE’s MDPSC-approved SOS program. BGE’s full requirements contracts that are considered derivatives qualify for the normal purchases and normal sales scope exception under current derivative authoritative guidance. Under the SOS program, BGE is permitted to recover its electricity procurement costs from retail customers, plus an administrative fee which includes a shareholder return component and an incremental cost component. However, through December 2016, BGE provides all residential electric customers a credit for the residential shareholder return component of the administrative charge.

BGE has also entered into derivative natural gas contracts, which qualify for the normal purchases and normal sales scope exception, to hedge its price risk in the natural gas market. The hedging program for natural gas procurement has no direct impact on BGE’s financial position. However, under BGE’s market-based rates incentive mechanism, BGE’s actual cost of gas is compared to a market index (a measure of the market price of gas in a given period). The difference between BGE’s actual cost and the market index is shared equally between shareholders and customers.

BGE does not enter into derivatives for speculative or proprietary trading purposes. For additional information on these contracts, see Note 9 of the Combined Notes to Consolidated Financial Statements.

***Trading and Non-Trading Marketing Activities.*** The following detailed presentation of Exelon’s, Generation’s, ComEd’s and PECO’s trading and non-trading marketing activities is included to address the recommended disclosures by the energy industry’s Committee of Chief Risk Officers (CCRO).

The following table provides detail on changes in Exelon’s, Generation’s, ComEd’s and PECO’s mark-to-market net asset or liability balance sheet position from December 31, 2012 to March 31, 2013. It indicates the drivers behind changes in the balance sheet amounts. This table incorporates the mark-to-market activities that are immediately recorded in earnings as well as the settlements from OCI to earnings and changes in fair value for the cash flow hedging activities that are recorded in accumulated OCI on the Consolidated Balance Sheets. This table excludes all normal purchase and normal sales contracts. See Note 9 of the Combined Notes to the Consolidated Financial Statements for additional information on the balance sheet classification of the mark-to-market energy contract net assets (liabilities) recorded as of March 31, 2013 and December 31, 2012.

|  | Generation | ComEd | Intercompany Eliminations(b) | Exelon |
| --- | ---: | ---: | ---: | ---: |
| Total mark-to-market energy contract net assets (liabilities) at December 31, 2012(a) | $1,505 | $(293) | $— | $1,212 |
| Total change in fair value during 2013 of contracts recorded in result of operations | (340) | — | 7 | (333) |
| Reclassification to realized at settlement of contracts recorded in results of operations | (61) | — | 10 | (51) |
| Reclassification to realized at settlement from accumulated OCI(c) | (223) | — | 124 | (99) |
| Changes in fair value — energy derivatives(d) | — | 133 | (141) | (8) |
| Changes in allocated collateral | 202 | — | — | 202 |
| Changes in net option premium paid/(received) | 3 | — | — | 3 |
| Option premium amortization(e) | (21) | — | — | (21) |
| Other balance sheet reclassifications | (2) | — | — | (2) |
| Total mark-to-market energy contract net assets (liabilities) at March 31, 2013(a) | $1,063 | $(160) | $— | $903 |

(a) Amounts are shown net of collateral paid to and received from counterparties.

(b) Amounts related to the five-year financial swap between Generation and ComEd are eliminated in consolidation.

(c) For Generation, includes $ 124 million of losses from reclassifications from accumulated OCI to recognize gains in net income related to settlement of the five-year financial swap contract with ComEd for the three months ended March 31, 2013.

(d) For ComEd, the changes in fair value are recorded as a change in regulatory assets or liabilities. As of March 31, 2013, ComEd recorded a $160 million regulatory asset related to its mark-to-market derivative liabilities with Generation and unaffiliated suppliers. As of March 31, 2013, this included $8 million of decreases in fair value and $133 million for reclassifications from regulatory asset to recognize cost in purchased power expense due to settlements of ComEd’s five-year financial swap with Generation. As of March 31, 2013, ComEd also recorded $11 million of increases in fair value and $3 million of realized losses due to settlements associated with floating-to-fixed energy swap contracts with unaffiliated suppliers.

(e) Includes $21 million of amounts reclassified to realized at the settlement of contracts recorded to results of operations related to option premiums due to the settlement of the underlying transactions for the three months ended March 31, 2013.

***Fair Values.*** The following tables present maturity and source of fair value for Exelon, Generation and ComEd mark-to-market commodity contract net assets (liabilities). The tables provide two fundamental pieces of information. First, the tables provide the source of fair value used in determining the carrying amount of the Registrants’ total mark-to-market net assets (liabilities), net of allocated collateral. Second, the tables show the maturity, by year, of the Registrants’ commodity contract net assets (liabilities), net of allocated collateral, giving an indication of when these mark-to-market amounts will settle and either generate or require cash. See Note 8 of the Combined Notes to Consolidated Financial Statements for additional information regarding fair value measurements and the fair value hierarchy.

### Exelon

| Normal Operations, Commodity derivative contracts(a)(b): | Maturities Within 2013 | 2014 | 2015 | 2016 | 2017 | 2018 and Beyond | Total Fair Value |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Actively quoted prices (Level 1) | $118 | $(28) | $(34) | $11 | $1 | $— | $68 |
| Prices provided by external sources (Level 2) | 189 | 297 | 77 | 14 | (1) | (1) | 575 |
| Prices based on model or other valuation methods (Level 3)(c) | 55 | 102 | 59 | 37 | 24 | (17) | 260 |
| Total | $362 | $371 | $102 | $62 | $24 | $(18) | $903 |

(a) Mark-to-market gains and losses on economic hedge and trading derivative contracts that are recorded in the results of operations.

(b) Amounts are shown net of collateral paid to and received from counterparties (and offset against mark-to-market assets and liabilities) of $233 million at March 31, 2013.

(c) Includes ComEd’s net assets (liabilities) associated with the floating-to-fixed energy swap contracts with unaffiliated suppliers.

### Generation

| Normal Operations, Commodity derivative contracts(a)(b): | Maturities Within 2013 | 2014 | 2015 | 2016 | 2017 | 2018 and Beyond | Total Fair Value |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Actively quoted prices (Level 1) | $118 | $(28) | $(34) | $11 | $1 | $— | $68 |
| Prices provided by external sources (Level 2) | 189 | 297 | 77 | 14 | (1) | (1) | 575 |
| Prices based on model or other valuation methods (Level 3) | 155 | 112 | 73 | 50 | 37 | (7) | 420 |
| Total | $462 | $381 | $116 | $75 | $37 | $(8) | $1,063 |

(a) Mark-to-market gains and losses on economic hedge and trading derivative contracts that are recorded in the results of operations. Amounts include an $85 million gain associated with the five-year financial swap with ComEd.

(b) Amounts are shown net of collateral paid to and received from counterparties (and offset against mark-to-market assets and liabilities) of $233 million at March 31, 2013.

### ComEd

|  | Maturities Within 2013 | 2014 | 2015 | 2016 | 2017 | 2018 and beyond | Total Fair Value |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Prices based on model or other valuation methods(a) | $(100) | $(10) | $(14) | $(13) | $(13) | $(10) | $(160) |

(a) Represents ComEd’s net liabilities associated with the five-year financial swap with Generation and the floating-to-fixed energy swap contracts with unaffiliated suppliers.

### Credit Risk, Collateral, and Contingent Related Features (Exelon, Generation, ComEd, PECO and BGE)

The Registrants would be exposed to credit-related losses in the event of non-performance by counterparties that enter into derivative instruments. The credit exposure of derivative contracts, before collateral, is represented by the fair value of contracts at the reporting date. See Note 9 of the Combined Notes to Consolidated Financial Statements for a detail discussion of credit risk, collateral, and contingent related features.

### Generation

The following tables provide information on Generation’s credit exposure for all derivative instruments, normal purchase normal sales agreements, and applicable payables and receivables, net of collateral and instruments that are subject to master netting agreements, as of March 31, 2013. The tables further delineate that exposure by credit rating of the counterparties and provide guidance on the concentration of credit risk to individual counterparties and an indication of the duration of a company’s credit risk by credit rating of the counterparties. The figures in the tables below do not include credit risk exposure from uranium procurement contracts or exposure through RTOs, ISOs, NYMEX, ICE, and Nodal commodity exchanges, which are discussed below. Additionally, the figures in the tables below do not include exposures with affiliates, including net receivables with ComEd, PECO and BGE of $44 million, $59 million and $25 million, respectively. See Note 22 of the Exelon 2012 Form 10-K for further information.

| Rating as of March 31, 2013 | Total Exposure Before Credit Collateral | Credit Collateral(a) | Net Exposure | Number of Counterparties Greater than 10% of Net Exposure | Net Exposure of Counterparties Greater than 10% of Net Exposure |
| --- | ---: | ---: | ---: | ---: | ---: |
| Investment grade | $1,459 | $184 | $1,275 | 1 | $387 |
| Non-investment grade | 49 | 29 | 20 | — | — |
| No external ratings |  |  |  |  |  |
| Internally rated — investment grade | 403 | 5 | 398 | 1 | 252 |
| Internally rated — non-investment grade | 44 | 1 | 43 | — | — |
| Total | $1,955 | $219 | $1,736 | 2 | $639 |

| Rating as of March 31, 2013 | Maturity of Credit Risk Exposure Less than 2 Years | 2-5 Years | Exposure Greater than 5 Years | Total Exposure Before Credit Collateral |
| --- | ---: | ---: | ---: | ---: |
| Investment grade | $991 | $311 | $157 | $1,459 |
| Non-investment grade | 31 | 18 | — | 49 |
| No external ratings |  |  |  |  |
| Internally rated — investment grade | 229 | 169 | 5 | 403 |
| Internally rated — non-investment grade | 41 | 2 | 1 | 44 |
| Total | $1,292 | $500 | $163 | $1,955 |

| Net Credit Exposure by Type of Counterparty | As of March 31, 2013 |
| --- | ---: |
| Investor-owned utilities, marketers and power producers | $515 |
| Energy cooperatives and municipalities | 824 |
| Financial Institutions | 352 |
| Other | 45 |
| Total | $1,736 |

(a) As of March 31, 2013, credit collateral held from counterparties where Generation had credit exposure included $172 million of cash and $47 million of letters of credit.

### ComEd

There have been no significant changes or additions to ComEd’s exposures to credit risk that are described in ITEM 1A. RISK FACTORS of Exelon’s 2012 Annual Report on Form 10-K.

See Note 9 of the Combined Notes to Consolidated Financial Statements for information regarding credit exposure to suppliers.

### PECO

There have been no significant changes or additions to PECO’s exposures to credit risk as described in ITEM 1A. RISK FACTORS of Exelon’s 2012 Annual Report on Form 10-K.

See Note 9 of the Combined Notes to Consolidated Financial Statements for information regarding credit exposure to suppliers.

### BGE

There have been no significant changes or additions to BGE’s exposures to credit risk as described in ITEM 1A. RISK FACTORS of Exelon’s 2012 Annual Report on Form 10-K.

See Note 9 of the Combined Notes to Consolidated Financial Statements for information regarding credit exposure to suppliers.

### Collateral (Exelon, Generation, ComEd, PECO and BGE)

#### Generation

As part of the normal course of business, Generation routinely enters into physical or financial contracts for the sale and purchase of electricity, fossil fuel and other commodities. These contracts either contain express provisions or otherwise permit Generation and its counterparties to demand adequate assurance of future performance when there are reasonable grounds for doing so. In accordance with the contracts and applicable law, if Generation is downgraded by a credit rating agency, especially if such downgrade is to a level below investment grade, it is possible that a counterparty would attempt to rely on such a downgrade as a basis for making a demand for adequate assurance of future performance. Depending on Generation’s net position with a counterparty, the demand could be for the posting of collateral. In the absence of expressly agreed-to provisions that specify the collateral that must be provided, collateral requested will be a function of the facts and circumstances of the situation at the time of the demand. In this case, Generation believes an amount of several months of future payments (i.e. capacity payments) rather than a calculation of fair value is the best estimate for the contingent collateral obligation, which has been factored into the disclosure below. See Note 9 of the Combined Notes to Consolidated Financial Statements for information regarding collateral requirements.

Generation sells output through bilateral contracts. The bilateral contracts are subject to credit risk, which relates to the ability of counterparties to meet their contractual payment obligations. Any failure to collect these payments from counterparties could have a material impact on Exelon’s and Generation’s results of operations, cash flows and financial position. As market prices rise above contracted price levels, Generation is required to post collateral with purchasers; as market prices fall below contracted price levels, counterparties are required to post collateral with Generation. In order to post collateral, Generation depends on access to bank credit facilities, which serve as liquidity sources to fund collateral requirements. See Note 10 of the Combined Notes to Consolidated Financial Statements for additional information.

As of March 31, 2013, Generation had $467 million cash collateral deposit payments being held by counterparties and Generation was holding $236 million of cash collateral deposits received from counterparties, of which $233 million in net cash collateral deposits was offset against mark-to-market assets and liabilities. As of March 31, 2013, $2 million of cash collateral received was not offset against net derivative positions because it was not associated with energy-related derivatives. See Note 17 of the Combined Notes to Consolidated Financial Statements for information regarding the letters of credit supporting the cash collateral.

#### ComEd

As of March 31, 2013, ComEd held immaterial amounts of cash and letters of credit for the purpose of collateral from suppliers in association with energy procurement contracts and held approximately $19 million in the form of cash and letters of credit for both annual and long-term renewable energy contracts. See Notes 5 and 9 of the Combined Notes to Consolidated Financial Statements for further information.

#### PECO

As of March 31, 2013, PECO was not required to post collateral under its energy and natural gas procurement contracts. See Note 9 of the Combined Notes to Consolidated Financial Statements for further information.

#### BGE

BGE is not required to post collateral under its electric supply contracts. As of March 31, 2013, BGE was not required to post collateral under its natural gas procurement contracts, nor was it holding collateral under its electric supply and natural gas procurement contracts. See Note 9 of the Combined Notes to Consolidated Financial Statements for further information.

### RTOs and ISOs (Exelon, Generation, ComEd, PECO and BGE)

Generation, ComEd, PECO and BGE participate in all, or some, of the established, real-time energy markets that are administered by PJM, ISO-NE, ISO-NY, CAISO, MISO, SPP, AESO, OIESO and ERCOT. In these areas, power is traded through bilateral agreements between buyers and sellers and on the spot markets that are operated by the RTOs or ISOs, as applicable. In areas where there is no spot market, electricity is purchased and sold solely through bilateral agreements. For sales into the spot markets administered by an RTO or ISO, the RTO or ISO maintains financial assurance policies that are established and enforced by those administrators. The credit policies of the RTOs and ISOs may, under certain circumstances, require that losses arising from the default of one member on spot market transactions be shared by the remaining participants. Non-performance or non-payment by a major counterparty could result in a material adverse impact on the Registrants’ results of operations, cash flows and financial positions.

### Exchange Traded Transactions (Exelon and Generation)

Generation enters into commodity transactions on NYMEX, ICE and the Nodal exchange. The NYMEX, ICE and Nodal exchange clearinghouses act as the counterparty to each trade. Transactions on the NYMEX, ICE and Nodal exchange must adhere to comprehensive collateral and margining requirements. As a result, transactions on NYMEX, ICE and Nodal exchange are significantly collateralized and have limited counterparty credit risk.

### Long-Term Leases (Exelon)

Exelon’s consolidated balance sheets, as of March 31, 2013, included a $700 million net investment in coal-fired plants in Georgia and Texas subject to long-term leases. This investment represents the estimated residual value of leased assets at the end of the respective lease terms of approximately $1.5 billion, less unearned income of $800 million. The lease agreements provide the lessees with fixed purchase options at the end of the lease terms which are set at prices above the then expected fair market value of the plants. If the lessees do not exercise the fixed purchase options, the lessees return the leasehold interests to Exelon and Exelon has the ability to require the lessees to arrange a service contract with a third party for a period following the lease term. In any event, Exelon is subject to residual value risk to the extent the fair value of the assets are less than the residual value. This risk is mitigated by the fair value of the fixed payments under the service contract. The term of the service contract, however, is less than the expected remaining useful life of the plants and, therefore, Exelon’s exposure to residual value risk will not be mitigated by payments under the service contract in this remaining period. Lessee performance under the lease agreements is supported by collateral and credit enhancement measures, including letters of credit, surety bonds and credit swaps. Management regularly evaluates the creditworthiness of Exelon’s counterparties to these long-term leases. Since 2008, the entity providing the credit enhancement for one of the lessees did not meet the credit rating requirements of the lease. Consequently, Exelon has indefinitely extended a waiver and reduction of the rating requirement, which Exelon may terminate by giving 90 days notice to the lessee. Exelon monitors the continuing credit quality of the credit enhancement party.

### Interest Rate Risk (Exelon, Generation, ComEd, PECO and BGE)

The Registrants use a combination of fixed-rate and variable-rate debt to manage interest rate exposure. The Registrants may also utilize fixed-to-floating interest rate swaps, which are typically designated as fair value hedges, as a means to manage their interest rate exposure. In addition, the Registrants may utilize interest rate derivatives to lock in rate levels in anticipation of future financings, which are typically designated as cash flow hedges. These strategies are employed to manage interest rate risks. At March 31, 2013, Exelon had $800 million of notional amounts of fixed-to-floating hedges outstanding and $394 million of notional amounts of floating-to-fixed hedges outstanding. Assuming the fair value and cash flow interest rate hedges are 100% effective, a hypothetical 50 bps increase in the interest rates associated with unhedged variable-rate debt (excluding Commercial Paper and PECO Accounts Receivables Facility) and fixed-to-floating swaps would result in less than $ 1 million decrease in Exelon Consolidated pre-tax income for the three months ended March 31, 2013. Below is a summary of the interest rate hedges as of March 31, 2013.

### Equity Price Risk (Exelon and Generation)

Exelon and Generation maintain trust funds, as required by the NRC, to fund certain costs of decommissioning Generation’s nuclear plants. As of March 31, 2013, Generation’s decommissioning trust funds are reflected at fair value on its Consolidated Balance Sheets. The mix of securities in the trust funds is designed to provide returns to be used to fund decommissioning and to compensate Generation for inflationary increases in decommissioning costs; however, the equity securities in the trust funds are exposed to price fluctuations in equity markets, and the value of fixed-rate, fixed-income securities are exposed to changes in interest rates. Generation actively monitors the investment performance of the trust funds and periodically reviews asset allocation in accordance with Generation’s NDT fund investment policy. A hypothetical 10% increase in interest rates and decrease in equity prices would result in a $417 million reduction in the fair value of the trust assets. This calculation holds all other variables constant and assumes only the discussed changes in interest rates and equity prices. See ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS for further discussion of equity price risk as a result of the current capital and credit market conditions.

## Controls and procedures

As filed, 2,120 characters.

During the first quarter of 2013, each of Exelon’s, Generation’s, ComEd’s, PECO’s and BGE’s management, including its principal executive officer and principal financial officer, evaluated its disclosure controls and procedures related to the recording, processing, summarizing and reporting of information in its periodic reports that it files with the SEC. These disclosure controls and procedures have been designed by all Registrants to ensure that (a) material information relating to that Registrant, including its consolidated subsidiaries, is accumulated and made known to Exelon’s management, including its principal executive officer and principal financial officer, by other employees of that Registrant and its subsidiaries as appropriate to allow timely decisions regarding required disclosure, and (b) this information is recorded, processed, summarized, evaluated and reported, as applicable, within the time periods specified in the SEC’s rules and forms. Due to the inherent limitations of control systems, not all misstatements may be detected. These inherent limitations include the realities that judgments in decision-making can be faulty and that breakdowns can occur because of simple error or mistake. Additionally, controls could be circumvented by the individual acts of some persons or by collusion of two or more people.

Accordingly, as of March 31, 2013, the principal executive officer and principal financial officer of each of Exelon, Generation, ComEd, PECO and BGE concluded that such Registrant’s disclosure controls and procedures were effective to accomplish its objectives. All Registrants continually strive to improve its disclosure controls and procedures to enhance the quality of its financial reporting and to maintain dynamic systems that change as conditions warrant. However, there have been no changes in internal control over financial reporting that occurred during the first quarter of 2013 that have materially affected, or are reasonably likely to materially affect, any of Exelon’s, Generation’s, ComEd’s, PECO’s and BGE’s internal control over financial reporting.

## Risk factors

As filed, 168 characters.

### Risks Related to Exelon

At March 31, 2013, the Registrants’ risk factors were consistent with the risk factors described in Exelon’s 2012 Annual Report on Form 10-K.

Filed May 10, 2013.
Source: SEC EDGAR, the filing index for accession 0001193125-13-211545. Last ingested by Listed: Nov 14, 2026, 14:06 ET. No prices; not investment advice.