# USA Rare Earth, Inc.: Form 10-K for the period ended Dec 31, 2024

- Company: [USA Rare Earth, Inc.](/companies/usar.md) (CIK 1970622)
- Form: 10-K
- Filed: 2025-03-31
- Accepted by EDGAR: Mar 31, 2025, 17:28 ET
- Period: 2024-12-31
- Accession: 0001213900-25-026445
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1970622/000121390025026445/ea0236222-10k_usarare.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1970622/000121390025026445/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2024-12-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Operating income | 12 months, 2024-01-01 to 2024-12-31 | −$4.1m | us-gaap:OperatingIncomeLoss |
| Net income | 12 months, 2024-01-01 to 2024-12-31 | $7.9m | us-gaap:NetIncomeLoss |
| Operating cash flow | 12 months, 2024-01-01 to 2024-12-31 | −$1.4m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Share repurchases | 12 months, 2024-01-01 to 2024-12-31 | $246.9m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Current assets | at 2024-12-31 | $60.5k | us-gaap:AssetsCurrent |
| Total assets | at 2024-12-31 | $24.1m | us-gaap:Assets |
| Current liabilities | at 2024-12-31 | $3.9m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2024-12-31 | $17.1m | us-gaap:Liabilities |
| Shareholders' equity | at 2024-12-31 | −$17.0m | us-gaap:StockholdersEquity |

## Business

As filed, 69,889 characters.

### Overview

USARE is a company whose mission is to establish a domestic rare earth magnet supply chain that supports the future state of energy, mobility, and national security in the United States. USARE is developing a rare earth sintered neo magnet (“neo magnet”) manufacturing plant in Stillwater, Oklahoma, and intends to establish domestic rare earth and critical minerals supply, extraction, and processing capabilities to both supply its magnet manufacturing plant and market surplus materials to third-parties. Rare earth magnets are critical to various business sectors and industries, including the defense, automotive, aviation, industrial, medical and consumer electronics industries, among others. USARE is planning to take a broad approach to the industries it serves with the intention of providing high quality sintered neo magnets to a variety of industries and customers. The Company’s intention is to take a structured approach to building out its supply chain to supply feedstock to its magnet facility. While our vision is to ultimately vertically integrate our operations, we will be evaluating each stage of the magnet supply chain to find the optimal approach to maximizing value from mine to magnet. USARE controls rights to a deposit of rare earths, the Round Top Deposit (as defined below), in West Texas. While this deposit could potentially provide significant value to USARE and its operations over the long term, USARE initially will be focused on partnering with ex-China suppliers and building or buying the capabilities we need to profitably manufacture high quality neo magnets in the United States. USARE’s long-term approach — from sourcing rare earths, in addition to other critical minerals such as gallium, to producing finished neo magnets — assists in strengthening the United States’ control over critical supply chains such as the supply of rare earth minerals and magnets and thus reducing domestic reliance on foreign, particularly Chinese, imports. USARE’s focus on developing domestic rare earth production aligns with national priorities, offering the future potential of a sustainable and secure domestic supply of materials critical to key industries.

### History of USARE

USA Rare Earth, LLC, a Delaware limited liability company, was organized in Delaware in 2019. In connection with the Company’s organization a member of the Company contributed its rights related to Round Top to the Company.

In May 2021 the Company completed the acquisition of 80% of the equity interests of Round Top Mountain Development LLC (“RTMD”) pursuant to a contribution agreement with the Company, Texas Mineral Resource Corp. (“TMRC”) and RTMD whereby TMRC and the Company contributed their respective rights and interests in and to Round Top to RTMD. Concurrently, the Company, TMRC and RTMD entered into a limited liability company agreement of RTMD. As of December 31, 2024, USA Rare Earth, LLC is the owner of approximately 81% of the equity interests in RTMD.

On the Closing Date, we consummated the Business Combination and Inflection Point Acquisition Corp. II was renamed “USA Rare Earth, Inc.” As a result of the Business Combination, we are a holding company, all of whose assets are held directly or indirectly by, and all of whose operations are conducted through, USARE OpCo and whose only direct asset consists of equity ownership of USARE OpCo. As the manager of USARE OpCo, we have all management powers over, and full control of, the business of USARE OpCo, including the power to take all action we deem necessary, appropriate, advisable, incidental, or convenient to accomplish the purposes of USARE OpCo set forth in its A&R Operating Agreement

USARE OpCo is the sole owner of USARE Rare Earth Magnets, LLC, a Delaware limited liability company (“Magnet Sub”), which owns, directly or indirectly, the Company’s magnet equipment and real estate in Stillwater, Oklahoma comprising the Stillwater Facility.

### USARE’s Facilities

### Stillwater, Oklahoma Magnet Manufacturing Facility

*Magnet Production.* The Company’s magnet production facility is located in Stillwater, Oklahoma (the “Stillwater Facility”). The Stillwater Facility is an industrial facility of approximately 310,000 square feet that was built in 1984, with an addition being added in 1988. The Stillwater Facility sits on an approximately 40-acre parcel that is serviced by municipal utilities. The facility, as currently constructed, will allow for the buildout of up to 4,800 tpa nameplate capacity within the current facility. The large lot surrounding the facility can also provide the space to build on new manufacturing capacity or capabilities in the future. USARE purchased the Stillwater Facility in 2022 and has contributed significant capital into the facility to date, including initial acquisition costs, structural improvements, renovations, the purchase of magnet production equipment, and purchase and installation of lab equipment for the Company’s in-house Innovations Lab (the “Lab”).

The Stillwater Facility contains magnet production equipment, which the Company owns outright. The Company engaged a third-party team with experience utilizing the equipment as independent consultants to assist in the initial installation and testing of the equipment. The Company believes that this equipment, supported by a third-party team who has run it successfully in the past, could help the Company rapidly commission the facility once completed. The Company has ordered the remaining finishing equipment and has begun to build out the infrastructure it needs at the facility to support commercial production with the intention of commissioning the facility in 2026

In connection with the completion of the Stillwater Facility, the Company is developing its Lab to support the Company’s magnet production capabilities and accompanying required assessment of finished product for satisfaction of customer specifications and requirements. On March 31, 2025 the Company announced it has commissioned its Lab and will begin prototyping permanent neo magnets for its customers in the second quarter of 2025. The Lab will further support our objective of completing the first phase of the Stillwater Facility to allow for the initial commercial production of neo magnets in 2026. For phase 1, we are targeting 1,200 tpa of nameplate capacity, which will require significant additional expenditures. We intend to add future capacity in multiple phases over the next few years to ultimately achieve 4,800 tpa nameplate capacity. The speed of that buildout will be based on future customer demand and market conditions. Our plan to sell to a diverse set of customers across a variety of industries is expected to be a differentiator in the market. We also believe that our focus in developing strong, in-house lab capabilities to develop new intellectual property ourselves, as well as together with our customers, to potentially improve magnet technology, will provide a powerful incentive for customers to work with us in the coming years.

*Corporate Offices.* The Company’s corporate offices are also located at the Stillwater Facility at 100 W Airport Road, Stillwater, Oklahoma 74075. From this location, the Company manages its overarching business strategy, investor relations, and the development of partnerships with key stakeholders in both the public and private sectors. Oklahoma provides access to a skilled workforce and a business-friendly environment.

### Colorado Mining Research Facility

The Company’s Wheat Ridge, Colorado facility (the “Colorado Facility”) is the central hub for the Company’s research activities focused on rare earth and critical minerals extraction and separation as well as advanced processing technologies. The Colorado Facility is not a production facility, but rather develops and refines the technologies that, with success, would be applied at the Company’s Round Top Project. The current focus of the Colorado Facility’s research is the development of separation processes to minimize the use of organic solvents, intended to result in a lower waste profile as compared to alternative separation methods.

The Colorado Facility’s work is critical in creating new methods for separating and processing rare earths in a way that is both cost-effective and environmentally sustainable. These efforts have been ongoing, and the facility has successfully separated a number of rare earths, including dysprosium and terbium, among others, from its Round Top Deposit to date. These efforts support the Company’s commitment to domestic rare earth production and the long-term stability of the United States’ rare earth supply chain.

The Colorado Facility comprises two leased buildings adjacent to each other. The Company renewed its leases on both buildings in February 2025 with both leases expiring in the first quarter of 2028. As further discussed below, the Company holds a radioactive equipment registration issued for the benefit of its Colorado Facility.

### Round Top Mountain

*Overview.* USARE controls the mining rights to Round Top Mountain, which is an above-ground mineral deposit near Sierra Blanca, Texas that contains a large deposit of rare earths, including both light and heavy rare earths, such as neodymium, dysprosium, and terbium, as well as other critical minerals such as gallium, beryllium and lithium among others (such deposits, collectively, the “Round Top Deposit”, and USARE’s development there, the “Round Top Project,” and together with the Stillwater Facility, the “Projects”). One of the most significant aspects of the Round Top Deposit is its deposit of heavy rare earths, which are particularly scarce but critical for the production of high-performance neo magnets. The presence of heavy rare earths in great quantities could become a significant competitive advantage to USARE, and value creator, as heavy rare earths such as dysprosium and terbium are critical to magnet production and tend to be of much higher value in commodity markets due to their rare nature. In contrast to light rare earths, such as those found at Mountain Top in California, heavy rare earths are, in general, significantly harder to source and are primarily mined in China, underscoring the importance of establishing Round Top Deposit as a critical domestic supply of rare earth and critical mineral feedstock. In addition to rare earths, the Round Top Deposit also contains a large deposit of gallium, a critical mineral for semiconductor, computer chip and some military technologies, among others, that were recently banned for export to the United States by China. China is the source of approximately 98% of primary gallium according to a January 2023 USGS Mineral Commodity Summary on gallium. In addition, the deposit holds beryllium, which is used in a variety of technologies from x-rays and MRIs to military radar and nuclear power. Finally, the Round Top Deposit holds lithium, a critical material for battery production, making it a dual-source project that supports the electrification of vehicles, production of renewable energy technologies, and defense technologies, among other critical industries. Rare earth oxide is a necessary component in producing NdFeB alloy used to produce neo magnets.

Round Top Mountain is approximately eight miles southeast of Sierra Blanca, Texas. Sierra Blanca, the county seat of Hudspeth County, is itself approximately 85 miles southeast of El Paso, Texas. The Round Top Project’s approximate center is located at 31.2766º N, 105.4742º W. Round Top Mountain’s location allows access to nearby Interstate 10 and Ranch Road 1111, and potential access to the nearby Union Pacific Railroad which has two main branches approximately three miles from Round Top Mountain. The Company expects Interstate 10 and the Union Pacific Railroad to aid in the future distribution of rare earth and critical minerals once the Company’s Round Top Project is fully operational and producing. Although not critical to scaling up its magnet production, the Company intends for its Round Top Project to serve as a long-term additional source of feedstock for its magnet production at the Stillwater Facility, which would help the Company achieve its goals of providing domestic, virgin feedstock for its magnet production.

The Company believes that the integration of the Round Top Project’s mine into its operations would not only help it meet growing demand for both domestic rare earth magnets and battery materials, but also importantly allow it to achieve greater supply chain security, cost control, and independence from foreign suppliers.

For more information about the Round Top Project, see the section entitled “— *Description of the Round Top Project”.*

### Market Opportunity and Growth

### Science and Construction of Neo Magnets

Neo magnets are one of the most powerful types of permanent magnets commercially available, as noted in a February 2023 report by the U.S. Department of Commerce, Bureau of Industry and Security. Neo magnets exhibit strong magnetic properties due to the atomic structure of neodymium, a rare earth, which permits a dense concentration of magnetic field lines. This allows for the production of neo magnets that can produce powerful magnetic fields relative to their size and weight and may be resistant to demagnetization, making them ideal for applications that require both high efficiency and compactness, such as electric vehicle motors, wind turbines, and advanced electronics.

The production of neo magnets involves a sophisticated process that includes the alloying of neodymium with iron and boron, followed by additional processing techniques to form the desired magnetic shape and performance. The properties of the magnets can be further enhanced by adding heavy rare earths such as dysprosium and terbium through additional post-sintering processing in a process called “Grain Boundary Diffusion” which can increase the magnets’ resistance to heat — a critical factor for high-performance applications. This technological complexity, coupled with the limited availability of key rare earth materials, has made the development and production of neo magnets a highly specialized and strategically important industry.

### The Rare Earth Magnet Industry: Challenges and Growth Opportunities

The global rare earth magnet industry has experienced rapid growth over the past decade according to the 2024 Statistical Review of World Energy by the Energy Institute, driven by the rise of electric vehicles, renewable energy technologies, and advanced electronics. Neo magnets are crucial to these technologies due to their high magnetic strength and resistance to demagnetization. As nations push globally for cleaner energy solutions and decarbonization, the demand for neo magnets is expected to continue growing significantly as noted by the U.S. Department of Energy in its 2022 supply chain deep dive assessment “Rare Earth Permanent Magnets” (the “DOE Report”).

However, the industry faces notable challenges. China currently dominates the global supply chain of the world’s rare earth production. This creates supply chain vulnerability for other nations, particularly the United States, as geopolitical tensions and export restrictions (such as China’s December 2023 rare earth technology export ban) could disrupt access to these critical materials. Additionally, rare earth extraction and processing is generally environmentally challenging, requiring the development of more sustainable and efficient technologies to meet global demand while minimizing potential environmental impact.

Despite these challenges, USARE believes that both the domestic and global rare earth magnet industries are poised for substantial growth. The global shift toward electrification of transportation, the rise of wind energy, and the ongoing demand for advanced electronics create significant opportunities for manufacturers that can establish stable and sustainable supply chains. The automotive industry is a major purchaser of neo magnets, particularly in connection with the production of electric vehicles that require neo magnets for traction motors, which are crucial components to the performance and efficiency of electric cars. As countries set aggressive targets for electric vehicle adoption in an effort to combat climate change, the demand for neo magnets is expected to surge over the next decade, as noted in the DOE Report. Even in a potential scenario of slower growth for electric cars that is now possible in the United States due to the anticipated changing policies of the Trump administration, there are significant growth opportunities for domestic supply of neo magnets in the existing domestic market due to potential instability in supply of rare earth magnets from China. In addition, growth in EV sales globally outside of China and the United States remains robust. Similarly, wind turbines rely on neo magnets for their generators, which convert wind energy into electricity. As governments worldwide set ambitious targets for increasing the share of renewable energy in their power grids, the installation of new wind turbines is expected to rise, further driving the need for neo magnets as noted in the DOE Report. While the recent Trump administration executive order to stop the building of wind turbines on federal lands and offshore may slow down the growth of this industry in the United States, we believe that global growth in wind power outside of China will continue to increase, and existing infrastructure projects in the United States will need to be maintained and have their parts replaced in the coming years. In addition, the use of magnets includes a wide variety of other industries, including industries as diverse as robotics, medicine, semiconductors, computing, power tools, among others. Importantly, the defense industry is a critical consumer of neo magnets, which uses them in precision-guided munitions, radar systems, aerospace technology, and naval craft. As nations invest in not only modernizing their defense capabilities, but also in purchasing from safer domestic supply the demand for domestic neo magnets in defense technologies is expected to continue to grow as noted in the DOE Report.

The Company believes it is well-positioned to capitalize both on existing domestic demand, which is currently sourcing magnets from China, as well as on the anticipated growth in the demand for neo magnets and reduce United States reliance on foreign suppliers.

### Business Plan

### Stage I: Feedstock Relationships and Initial Neo Magnet Production

The first stage of the Company’s business plan is focused on laying the groundwork for its neo magnet production by predominantly securing essential raw material feedstock through strategic business relationships and launching initial production of neo magnets at its Stillwater Facility. While ultimately the Company intends to satisfy its feedstock needs through the future development of its Round Top Project, the Company does not believe it is critical to success and in the near term the Company intends to source its feedstock needs from third-party suppliers.

#### Feedstock Sources

The Company has established a business relationship with a supplier of feedstock to supply a portion of its raw material feedstock to USARE for use in the initial production of the Company’s neo magnets. The supplier is a vertically integrated, producer of critical metals and NdFeB alloy (also known as “strip cast”) produced from rare earth oxides, with the ability to source rare earth oxides from sources other than China. USARE has entered into a long-term Metal Sales and Tolling Framework Agreement with the supplier, whereby USARE has agreed to purchase 60% of its NdFeB feedstock for phase 1 and 2 of its magnet production capacity from the supplier. The agreement is effective through December 31, 2028, subject to earlier termination by the parties. The purchase price for the strip cast feedstock that USARE purchases from the supplier will be determined in accordance with a set schedule, which ties the purchase price to a relevant index and certain chemical specifications.

The Company intends to establish relationships with additional companies to assist in meeting its planned future feedstock requirements to continue to build out and strengthen its domestic and global supply of rare earths from third-parties until such time that the Round Top Project is able to substantially augment its current supply of light and heavy rare earths needed for production, and such activities may include rare earth oxide supply agreements once the Company is able to utilize rare earth oxide feedstock for in-house alloy production.

#### Initial Neo Magnet Production

Stage I of the Company’s business plan includes the completion of the Stillwater Facility, its magnet production facility in Stillwater, Oklahoma. Upon completion of the facility and the initial production of neo magnets, the Company expects its Stillwater Facility to be one of the first United States-based producers of neo magnets. Magnet production at the Stillwater Facility is currently planned in three phases, starting with 1,200 tpa nameplate capacity in phase 1 and potentially doubling in each subsequent phase to a total planned production of 4,800 tpa nameplate capacity. The Stillwater Facility is expected to initially have a production line with 600 tpa nameplate capacity utilizing currently owned equipment, with a goal to complete the remaining phase 1 capacity (representing a total of 1,200 tpa nameplate capacity in phase 1) in 2026. The Company believes this will make the Stillwater Facility one of the most significant sources of neo magnets outside of China, once complete. Unlike its competitors, the Company is not building its initial lines for a single customer and is instead focused on building a manufacturing facility and capability that is flexible enough) to serve a variety of customers in diverse industries. It is the Company’s belief that such an approach will allow it to reach its early revenue targets sooner than it might otherwise would be able to through due to the long qualification process with large automotive clients.

The Company is in the process of engaging potential customers for offtake agreements.

### Stage II: Scaling Magnet Production and Expanding Business Partnerships

Stage II of the Company’s business plan is focused on scaling magnet production at its Stillwater Facility and expanding the Company’s business relationships, both with feedstock suppliers and customers. The Company intends to scale magnet production at its Stillwater Facility from 1,200 tpa nameplate capacity in phase 1 through phases 2 and 3 of magnet production capacity, potentially doubling the production of the prior phase, with a target total nameplate capacity of 4,800 tpa. How rapidly the Company will scale is dependent on demand and access to the capital to do so. To support the increased production, the Company intends to (i) expand its partnerships and supply agreements with key industry players, and (ii) develop in-house metal making and strip casting capabilities to support its magnet production, to help provide for the continued and reliable flow of feedstock into the Company’s production lines at the Stillwater Facility until its Round Top Project is capable of satisfying the Company’s feedstock needs. These expanded partnerships will help the Company diversify its feedstock supply sources, reduce potential supply chain risks and assist in further securing the Company’s position in the neo magnet market.

Additionally, the Company is working to strike a balance between obtaining a sufficiently broad customer base and securing offtake that can jumpstart production, which could come from large manufacturers over time. Over time, the Company will be engaged in discussions with potential customers for offtake agreements. The Company’s target customers for offtake could include key players in the automotive, energy, and defense industries, each of which requires a reliable and long-term supply of neo magnets. By seeking to secure multi-year offtake agreements, the Company aims to lock-in demand for its products, minimize market volatility risks and provide for a consistent revenue stream.

### Stage III: Mining Development at Round Top Mountain

Stage III of the Company’s business plan represents the full realization of the Company’s longer-term strategy. In this stage, the Company intends to focus on developing the mining operations at its Round Top Project. While the Company does not believe the development of the Round Top Deposit is critical to our success in our magnet business, once operational, the Round Top Project’s mine is expected to provide a domestic source of rare earths, feeding directly into the Company’s Stillwater magnet production facility, as well as selling to the broader rare earth commodity markets. By developing the Round Top Project into an economically producing mine, the Company aims to be able to self-sustain magnet production operations without relying on external sources for rare earth feedstock. This development is expected to enable the Company to maintain cost efficiencies and quality control over the entire production process. As part of its long-term growth strategy, the Company aims to expand the production capacity of both the Round Top Project and its Stillwater Facility, solidifying the Company’s efforts as it seeks to position itself as a key player in the domestic and global rare earth markets. Through the development of the Round Top Project into an economically producing mine, the Company intends to enhance its capacity to meet the rapidly growing demand for rare earth and critical minerals, positioning itself as a leader in the transition to a more secure energy future. If successful, this stage will mark the full vertical integration of the Company’s operations from mine to magnet and is expected to open up new markets and revenue streams for the Company.

The Company acknowledges that investing in mining deposits such as Round Top holds inherent risks. It is our intention to take a structured and measured approach to the development of the mine. We are planning a five phased approach: (1) flow sheet development, (2) prefeasibility study, (3) pilot plant, (4) definitive feasibility study, and (5) detailed engineering, construction, and commissioning of the mine.

At each stage of this phased approach, investment requirements are expected to increase as we define the economic and operational basis for the future mine. Today, we are investing in research to establish a technically sound flow sheet. Once we have established an economically viable execution strategy in our prefeasibility study following this flow sheet, we intend to construct pilot facilities to validate the Round Top process and provide data for detailed engineering. By moving to a pilot phase, we can minimize investments while further reducing the execution risk inherent in the building of a full-scale producing mine. The results of each stage of this approach allow us the opportunity to pause or stop development, if results are negative, or increase our commitment if results are positive; thereby reducing our risk. This measured and focused approach will allow us to both manage cash in these early years, as well as pause or stop development if it looks like the mine may not be viable over the long term, either due to operational constraints or changes in the rare earth market itself.

### Patents, Trademarks, and Licenses

USARE has applied for a United States patent in connection with its methods for metal extraction. This patent application is currently pending. Additionally, the Company utilizes trade secret protection and non-disclosure agreements to protect its proprietary rare earth technology. USARE holds a trademark for its logo. Generally, the Company relies on a combination of trade secret protection, non-disclosure and licensing agreements, patents and trademarks to establish and protect its proprietary intellectual property rights.

### Government Programs and Grants

### Tax Incremental Financing

On June 6, 2022, USARE executed a redevelopment agreement providing for tax increment financing (the “TIF Agreement”) with the Stillwater Economic Development Authority (the “Authority”), a public trust having as its beneficiary the City of Stillwater, Oklahoma, whereby the Authority has provided upfront development financing assistance to USARE of $7.0 million for the development of the Stillwater Facility (the “Upfront Assistance”). Additionally, entry into the TIF Agreement made the Company eligible to receive a manufacturing and research and development ad valorem tax emption for a period of five years. The Company applied and received approval for the ad valorem tax exemption for the year ending December 31, 2023. After the expiration of the exemption period, the TIF Agreement requires the Authority to disburse to the Company 90% of the incremental ad valorem taxes generated by the ad valorem taxes assessed against the Stillwater Facility and paid by the Company. Under the terms of the TIF Agreement, among other things, the Company is required to complete the Stillwater Facility and in doing so to make an investment of approximately $140 million, including $9.9 million in building and land acquisition costs, $17 million in immediate building improvement construction costs and $113 million in additional building improvements and new equipment purchases, and to employ a specified number of employees at specified levels of median compensation at various stages of the development. Subject to agreed extensions, the Company agreed to commence certain phases of the development of the Stillwater Facility by no later than March 31, 2026, and complete that advanced development by no later than June 30, 2027, subject to certain exceptions. Should the Company default on its obligations under the TIF Agreement and after certain notice, cure periods and possible exceptions, the Authority may terminate the TIF Agreement and could make demand for immediate repayment in full of the Upfront Assistance.

### Governor’s Fund

On April 15, 2022, as restated on July 1, 2024, USARE entered into an agreement with the Oklahoma Department of Commerce to receive a $1.2 million award to be used for the renovation of an existing building at the Stillwater Facility (the “Governor’s Fund Agreement”), to be paid in $0.6 million increments when the Company had cumulatively spent $1.0 million and $2.0 million, respectively, in qualifying costs related to developing the Stillwater Facility by March 31, 2023, and May 31, 2023, respectively. As of December 31, 2023, the Company incurred qualifying costs that exceeded the cumulative $2.0 million threshold specified in the Governor’s Fund Agreement. The total award of $1.2 million was requested and received by the Company on April 6, 2023. Per the terms of the Governor’s Fund Agreement, the award is subject to repayment if the Company does not invest over $50 million in project, real and personal property improvements (as described in the Governor’s Fund Agreement) at the Stillwater Facility as well as comply with employment requirements of creating and fulfilling at least 100 new direct jobs at the Stillwater Facility at specified compensation levels and certain other limited circumstances. The Company is currently seeking to comply with such requirements.

### Jobs Program

In 2022, USARE was accepted for participation in the Oklahoma Quality Jobs Program (“Jobs Program”), an incentive program that provides qualifying companies quarterly cash rebates of up to 5% of the wages paid for new direct jobs created for a period of up to 10 years, with, in the case of the Company, a maximum payout of approximately $2.8 million, if it makes a qualifying claim for payment under the Jobs Program prior to January 1, 2026 and fulfills certain conditions pursuant to an agreement between Magnet Sub and the State of Oklahoma, dated December 19, 2022 (the “Jobs Program Agreement”). Under the Jobs Program Agreement, the Company must meet or exceed applicable payroll and employee headcount requirements and maintain operations in Oklahoma for a specified period. To date, the Company has not become eligible to make any claims under the Jobs Program.

### Competition

The Company faces, or is expected to face, significant competition both domestically and globally in the rare earth market, particularly in the production of sintered rare earth neo magnets. The most prominent global competitor is China, which controls a substantial majority of the world’s rare earth magnet production and has established dominance in the neo magnet supply chain and magnet production. China’s rare earth and magnet industries benefit from extensive government support, allowing Chinese companies to offer rare earths and magnets at subsidized prices, often undercutting other producers. Moreover, Chinese companies have invested heavily in improving their processing capabilities, giving them a technological and cost advantage in the global market. Since December 2023, China has banned the export of such technologies and capabilities. This dominant stronghold poses a challenge for the Company as it seeks to build a vertically integrated domestic supply chain.

Domestically, the Company competes with a small number of companies, including MP Materials Corp. which is operating the only major rare earth mine in the United States and recently began commissioning a 1,000 tpa magnet facility in Fort Worth, Texas. Additionally, there is growing competition from emerging players that are developing innovative technologies for rare earth separation and processing, as well as magnet production. As the demand for rare earth materials and neo magnets grows, the Company will need to not only navigate price competition but also innovate in separation and processing techniques while simultaneously securing long-term customer offtake agreements.

### Seasonality and Business Cycles

The Company’s operations in magnet production, and its planned future operations in mining, are both subject to certain seasonality and business cycles that can affect production output and market demand. These cycles are influenced by external factors such as weather conditions, regulatory changes, fluctuations in raw material prices whether due to changes in supply, demand, or inflation, and market demand for end products such as electric vehicles, renewable energy, and defense applications.

The demand for neo magnets can be cyclical. This demand is often driven by customer sentiment and demand, which may align with government policy changes, incentive programs, and general economic cycles. How this cyclicality may or may not affect USA Rare Earth will depend on the concentration of our customers in specific industries as we scale. With our planned strategy of serving a wide range of industries, we believe this cyclicality may be offset by a diverse set of customers in differing industries.

### Human Capital

The Company’s workforce spans multiple states, with employees located in Texas, Oklahoma, Missouri, California, Colorado, Ohio, and Florida, and encompasses a diverse range of professionals, including engineers, scientists, mining specialists, and manufacturing experts. The Company’s leadership is focused on attracting, developing, and retaining top talent across these areas to support its mission in building a vertically integrated domestic supply chain for rare earths and rare earth neo magnets. As of December 31, 2024, the Company had 29 employees. We have not experienced any work stoppages. None of our employees are represented by a labor union or are parties to a collective bargaining agreement.

A significant challenge for the Company and the broader rare earth industry is the shortage of experienced magnet production and mining professionals. The specialized nature of magnet production and rare earth mining, processing, and refining requires expertise that has been in decline, particularly in the United States, where magnet production and rare earth mining has been limited for decades. This shortage could present significant obstacles for companies like USARE that are working to establish a vertically integrated, domestic rare earth supply chain. The lack of skilled professionals with the necessary expertise can slow down project timelines, increase operational costs, and foster reliance on international talent.

### Environmental, Health and Safety Matters

The Company is, or may become, subject to numerous and extensive federal, state and local laws, regulations, permits and other legal requirements applicable to the magnet production, mining and mineral processing industries, including those pertaining to employee health and safety, air emissions, water usage, wastewater and stormwater discharges, air quality standards, greenhouse gas (“GHG”) emissions, waste management, plant and wildlife protection, handling and disposal of hazardous and radioactive substances, remediation of soil and groundwater contamination, land use, reclamation and restoration of properties, the discharge of materials into the environment and groundwater quality and availability. Such laws, regulations, permits and legal requirements have had, and will continue to have, a significant effect on our results of operations, earnings and competitive position. Environmental laws and regulations, as well as stakeholder expectations, continue to evolve, which may require us to meet stricter standards and give rise to greater enforcement, result in increased fines and penalties for non-compliance, and result in a heightened degree of responsibility for companies and their officers, directors and employees. Future laws, regulations, permits or legal requirements, as well as the interpretation or enforcement of existing requirements, may require substantial increases in capital or operating costs to achieve and maintain compliance or otherwise delay, limit or prohibit operations, or other restrictions upon, our current or future operations or result in the imposition of fines and penalties for failure to comply. Complying with this panoply of regulations is complicated and requires significant attention and resources. The Company’s employees have a significant amount of experience working with various federal, state and local authorities to address compliance with such laws, regulations and permits; however, we cannot assure you that at all times we have been or will be in compliance with such requirements.

The Company expects to continue to incur significant sums for ongoing operating environmental expenditures, including salaries, and the costs for monitoring, compliance, reporting, pollution control equipment and permitting. In addition, the Company plans to invest significant capital to maintain and upgrade certain infrastructure related to environmental sustainability and safety.

At the Stillwater Facility, the Company currently holds and is implementing a Spill Prevention and Countermeasures Control (“SPCC”) Plan. At the Round Top Project, the Company has obtained coverage under the Texas Commission on Environmental Quality (“TCEQ”) Construction Stormwater Permit TXR150000 and maintains the associated Storm Water Pollution Prevention Plan.

At one or both sites, the Company currently expects that it may need to obtain many or all of the following permits in the future to conduct its business as currently planned:

- Radioactive equipment registration
- Petroleum storage tank registration
- Industrial stormwater permit (or coverage under a general stormwater permit)
- Industrial waste registration
- Air emissions permit
- Industrial waste water on-site sewage and/or process water discharge permit
- Other building and/or construction permits

### Environmental, Health & Safety Laws and Regulations

The numerous and extensive federal, state and local environmental, health and safety laws and regulations to which the Company is or may be subject include the laws and regulations listed below. Violation of such laws and associated regulatory programs can result in civil, criminal and administrative penalties and substantial liability for the costs of correcting violations and remediating any environmental damage caused by the violations. Under certain statutes, private citizens may bring enforcement suits. We expect to maintain regular communication with regulatory bodies to stay updated on any changes or additional requirements.

*Mine Health and Safety Laws.* To fully adhere to the safety standards enforced by the Mine Safety and Health Administration (“MSHA”) under the Federal Mine Safety and Health Act of 1977, we plan to develop comprehensive mine safety and health programs in connection with the commissioning of the Round Top Project’s mine if and when such commissioning occurs including, but not limited to, regular MSHA inspections and reporting protocols, mandatory MSHA training programs (Part 46/48) for all personnel, implementation of emergency response and hazard mitigation plans, and continuous monitoring of air quality, dust, noise, and other environmental health factors.

*Surface Mining Control and Reclamation.* We may in the future, if and when the Round Top Project is a producing mine, be subject to applicable mining controls and land reclamation requirements. These controls and requirements generally establish operational, reclamation, and closure standards for surface mining operations. It is likely that we will need to meet comprehensive environmental protection and reclamation standards during the course of, and upon completion of, mining activities, and any failure to meet such standards may subject us to fines, penalties, or other sanctions.

*Endangered Species Act.* The Endangered Species Act (“ESA”) and comparable state statutes regulate activities that could have an adverse effect on threatened and endangered species, including the habitat and ecosystems upon which they depend. Compliance with ESA requirements can significantly delay, limit, or even prevent the development of projects, including the development of mining claims, and can also result in increased development costs. In addition, the ESA authorizes both civil and criminal penalties for ESA violations and authorizes citizen suits against any person alleged to be in violation of the ESA.

*National Environmental Policy Act.* The National Environmental Policy Act (“NEPA”) require agencies to integrate environmental considerations into their decision-making processes by evaluating the environmental impacts of their proposed actions, including issuance of permits to mining facilities, and assessing alternatives to those actions. If a proposed federal action could significantly affect the environment, the agency must prepare a detailed statement known as an Environmental Impact Statement (“EIS”). The United States Environmental Protection Agency (the “EPA”), other agencies, and any interested third parties may review and comment on the scoping of the EIS and the adequacy of and findings set forth in the draft and final EIS. This process can cause delays in issuance of required permits or result in changes to a project to mitigate its potential environmental impacts, which can in turn impact the economic feasibility of a proposed project.

*Clean Water Act.* The Clean Water Act (“CWA”) and comparable state statutes impose restrictions and controls on the discharge of pollutants into waters of the United States (or state waters under state laws). The CWA can regulate storm water from mining facilities and require a storm water discharge permit for certain activities. The CWA and regulations implemented thereunder also prohibit discharges of dredged and fill material in wetlands and other waters of the United States unless authorized by an appropriately issued permit. CWA regulations and controls generally have become more stringent over time, and it is possible that additional restrictions will be imposed in the future.

*Safe Drinking Water Act.* The Safe Drinking Water Act (“SDWA”) and comparable state statutes, the Underground Injection Control (“UIC”) program, and related state-administered programs regulate the drilling and operation of subsurface injection wells.

*Clean Air Act.* The Clean Air Act (“CAA”) and comparable state statutes govern the emission of air pollutants from many stationary and mobile sources, including mining, beneficiation, and processing activities. Our operations may produce air emissions, including fugitive dust and other air pollutants, from stationary equipment, storage facilities, and the use of mobile sources, such as trucks and heavy construction equipment, that are subject to review, monitoring, control requirements and emission limits under the CAA and state air quality laws. New sources, equipment or process enhancements, including with respect to the growth of our operations and Stage II optimization projects, may require additional permits, and existing sources may be required to incur capital costs to remain in compliance. In addition, permitting rules and issued permits or licenses may impose conditions or other limitations on production levels or result in additional capital or other expenditures to comply with such rules or permits.

*Comprehensive Environmental, Response, Compensation, and Liability Act (“CERCLA”).* CERCLA and comparable state laws impose strict, joint and several liability on current and former owners and operators of sites and on persons who disposed of or arranged for the disposal of hazardous substances found at such sites, regardless of the lawfulness of the original activities that led to the contamination. Moreover, current owners or operators of sites can be held liable for contamination caused by others, including former owners or operators, even if the current owners or operators did not contribute to the contamination. CERCLA authorizes the EPA and, in some cases, third parties to take actions in response to threats to public health or the environment and to seek to recover from the potentially responsible parties the costs of such actions.

*Resource Conservation and Recovery Act (“RCRA”).* RCRA and comparable state statutes govern the generation and disposal of solid waste and hazardous waste. Although certain mining, beneficiation, and mineral processing wastes currently are exempt from regulation as hazardous wastes under RCRA, EPA has limited the disposal options for certain wastes designated as hazardous wastes under RCRA. It is possible that wastes generated by our operations may in the future be designated as hazardous wastes and may therefore become subject to more rigorous and costly management, disposal, and clean-up requirements.

*Atomic Energy Act.* The Nuclear Regulatory Commission (“NRC”), pursuant to its authority under the Atomic Energy Act of 1954, as amended, oversees the regulatory framework governing the control of radioactive materials, including beneficiation and processing of rare earths that contain radioactive source materials such as uranium and thorium. The NRC is responsible for issuing licenses that govern the handling of source material involving certain concentrations of radioactive material. Our Round Top Project operations, once the Round Top Project mine is operational, including waste generation, may be subject to NRC regulations in order to receive title to, possess, use, transfer, deliver or export source and byproduct materials.

*Workers’ Compensation Laws.* Workers’ compensation laws in the states in which we operate govern our compensation of employees for work-related injuries. Agencies in those states consider changes in workers’ compensation laws from time to time. Our costs will vary based on the number and severity of accidents that may occur at our facilities and our costs of addressing these claims. We are insured under various workers’ compensation programs for our operations at our facilities.

From time to time, we may become involved in legal proceedings or be subject to claims that arise in the ordinary course of our business, the outcomes of which are subject to uncertainty. Any claims against us, whether meritorious or not, can be time-consuming, result in costly litigation, require significant management time, create a negative perception of the company with communities, stakeholders, and government agencies and result in the diversion of significant operational resources. See Item 3 — *Legal Proceedings* for information regarding legal proceedings.

### Description of the Round Top Project

*History.* The Round Top Deposit, located in Hudspeth County, Texas near the city of Sierra Blanca, Texas, was initially identified as a potential source of minerals in the mid-20th century and has long been recognized for its minerology, particularly its rare earths including heavy rare earths that are critical for a variety of advanced technologies. However, despite its potential, the Round Top Deposit remained largely untapped for many years due to the lower global demand for rare earths and the dominance of cheaper feedstock from foreign markets, particularly from China.

Interest in the Round Top Deposit resumed in the early 21st century as geopolitical concerns and technological advancements led to a renewed focus on securing domestic supplies of critical materials such as rare earths. The Round Top Deposit is considered exceptional in its geological composition, as it contains gallium, lithium, and at least 15 of the 17 rare earths, including a particularly high estimated concentration of heavy rare earths like dysprosium and terbium.

Documented exploration began in Sierra Blanca in the 1970s when W.N. McAnulty initiated trenching and limited drilling of fluorite deposits in the vicinity of Sierra Blanca, Texas. McAnulty recognized and identified beryllium mineralization associated with the massive fluorite. Adverse economic conditions for fluorite precluded development. In the 1970s, several uranium companies identified anomalous radiation and associated mineralization associated with the beryllium-fluorite deposit.

During the 1980s, Cabot Corporation (“Cabot”), a large chemical company with a beryllium fabrication division, initiated exploration at Round Top Mountain for beryllium. In 1987, Cyprus Metals Company (“Cyprus”) entered into a joint venture with Cabot and took over the project. The Cyprus exploration program drilled Sierra Blanca, Round Top Mountain and Little Round Top. Eventually, Cyprus focused on Round Top, specifically the “west end ore zone”. Extensive development drilling (82,000 feet), underground exploration drift (1,115 feet) and trial mining resulted in the completion of an internal feasibility study in June 1988 (Cyprus Sierra Blanca, Inc., 1988), which study would not be sufficient for Item 1300 purposes.

During the Cabot-Cyprus development project, the Texas Bureau of Economic Geology (“BEG”) conducted extensive research at Round Top and the surrounding area. The study identified beryllium mineralization and rare earth mineralization in the rhyolite. The research resulted in the three publications, one in 1987 on the mineralogy of the rhyolite (Rubin, et al., 1987), another in 1988 on the beryllium mineralization (Rubin et al., 1988), and another in 1990 on the detailed mineralogy and geochemistry of the rhyolite (Price et al., 1990). The 1990 Price, et al., publication, Geological Society of America Special Paper 246, is generally considered the most complete publication to date on Round Top.

In late 2007, Standard Silver Corporation, later to be renamed TRER in 2010, and then TMRC in 2013, acquired prospecting permits for Round Top from the Texas General Land Office (“GLO”).

*Accessibility.* The Round Top Project is located approximately eight miles northwest of the town of Sierra Blanca, Texas, which is the nearest town to Round Top Mountain and has a small population. The site is accessed from Interstate 10 through a series of paved and unimproved dirt roads. The property is not traversed by county roads and consists of a series of graded and primitive jeep roads. The nearest major airport is located in El Paso, Texas, 88 miles to the northwest. The site is approximately three miles north of Interstate 10. A railroad line is located near the Round Top Project and a spur line stops at a stone quarry within three miles of the Round Top Project. Skilled mining labor and support could potentially be found in the El Paso area and in the mining areas of New Mexico and Arizona.

*Ownership; Land and Water Leases.*

RTMD is a limited liability company majority owned and controlled by USARE for the purpose of developing the Round Top Deposit. TMRC (a mining exploration company) is the minority owner of RTMD. In May 2021, the Company completed the acquisition of 80% of RTMD, which controls the Company’s Round Top Project, including 100% of the mining rights to the Round Top Deposit, by entering into a Contribution Agreement and Operating Agreement with TMRC. This acquisition resulted in the consolidation of RTMD with USARE, and the recording of a “non-controlling interest” for the remaining 20%. Since May 2021, TMRC has elected to forfeit some of its ownership in RTMD in exchange for USARE meeting TMRC’s capital call obligations.

As of December 31, 2024, USARE owns 81% of the equity interests in RTMD, with TMRC owning the remaining approximately 19%. Pursuant to RTMD’s governing documents, in the event that TMRC does not fund its share of mandatory capital contributions called for by USARE as managing member, USARE is obligated to cover the shortfall by making additional capital contributions to RTMD. In the event that USARE does not cover the shortfall, the capital call will be withdrawn. If the capital call is funded by USARE, additional equity interests in RTMD will be issued to USARE and TMRC will be proportionally diluted in accordance with the amended and restated limited liability company agreement.

The Round Top Deposit is located on state property owned by the GLO. RTMD is party to a 19-year initial term, renewable Mining Lease Agreement (M-113117) with the GLO, dated September 2, 2011, and amended on January 26, 2012, March 29, 2012, and September 14, 2022. M-113117 will expire on September 1, 2030 unless extended. RTMD has also entered into an additional 19-year renewable Mining Lease Agreement (M-113629), dated November 1, 2011, with the GLO. Leases M-113117 and M-113629 (each a “Mineral Lease” and together, the “Mineral Leases”) represent approximately 860 and 90 acres, respectively, for a total of 950 leases acres in the Round Top Project area. M-113629 will expire on October 31, 2030 unless extended. The Mineral Leases provide RTMD with the use of the property identified, including certain rights with respect to the surface and subsurface, together with the corresponding rights of ingress and egress, for the purposes of mineral exploration, development, and exploitation of minerals. As the Round Top Project is still in its exploration stage, the Company is currently paying delay rental payments on an annual basis to the GLO as follows:

| M-113117 |  |
| --- | ---: |
| Anniversary Date 2024 | $134,154.90 |
| Anniversary Date 2025-2029 | $178,873.20 |

| M-113629 |  |
| --- | ---: |
| Anniversary Date 2024 | $13,500.00 |
| Anniversary Date 2025-2029 | $18,000.00 |

12

If and when the Round Top Project begins producing, the Mineral Leases would be converted into producing leases upon the satisfaction of certain conditions, which includes: (i) a minimum advance annual royalty of $500,000 for lease M-113117 and $50,000 for lease M-113629, due promptly following sales of leased minerals or the removal of leased minerals in commercial quantities from the leased premises and (ii) a production royalty equal to 8% of the market value of uranium and other fissionable minerals and 6.25% of the market value of all other leased minerals.

In addition to the Mineral Leases, the Company currently owns approximately 2037 acres of mine processing land and holds a current purchase option on 5,670 acres of which 950 acres are authorized for mining and the remainder (4,720 acres) is contemplated for future use as mine processing land (e.g., for use to assist in mine development, as leach fields, and/or as plant site) (the “Purchase Option”). Unless exercised prior, the Purchase Option will expire upon the expiration of Mining Lease M-113117 (September 2, 2030). As consideration for the Purchase Option, the Company is required to pay $10,000 to the GLO on each annual anniversary of the Effective Date of the Purchase Option (as defined in the Purchase Option) during the option term. If the Company fails to make a timely payment of the option fee, the Purchase Option will terminate. On August 26, 2022, the Company submitted to the GLO a Notice of Intent to exercise the Purchase Option. In February 2023, the GLO sent its appraisal of the value of the property associated with the Purchase Option to the Company. The Company and GLO are negotiating the exercise of the Purchase Option.

The Company is lessee under GLO Surface Lease SL2004002 (Grazing/Agricultural), which lease is for a term commencing on November 24, 2003 and expiring on November 23, 2028, for approximately 55,000 acres of surface rights in proximity to the Company’s Round Top Project (the “Surface Lease”). The Surface Lease is a pre-paid lease with a pro rata credit schedule and a “preference right agreement” to purchase all or part of the land. The Surface Lease grants the Company the right to use the leased premises for hunting, grazing, range and wildlife research, and any other purpose ancillary thereto, and allows, with GLO approval, the Company to commercially develop groundwater and to use the land for electric generation by wind power. Pursuant to the Surface Lease, the Company has the right to purchase all or part of the leased premises during the term of the lease in accordance with the terms set forth in the preference right agreement, an exhibit to the Surface Lease, provided that any purchase of tracts of land must be contiguous. The Surface Lease contains certain additional obligations, such as an obligation to maintain stated insurance coverages in certain situations, and to post certain deposits or bonds prior to commencing construction of any wind turbine, tower, buildings, or substations. The Company has the right to early terminate the lease, in which case the Company would be entitled to receive a refund of the prepayments made under the lease. There is no Company renewal option under the Surface Lease and any renewal of the Surface Lease is at the sole discretion of the GLO.

The Company is lessee under GLO Groundwater Lease SL20150003, dated August 1, 2014, as amended, for approximately 8,828 acres of water rights (the “Groundwater Lease”). The Groundwater Lease grants USARE rights in the land, including rights of ingress and egress, for the purpose of exploring, evaluating, drilling for, producing, developing, and extracting groundwater from the leased land for industrial and potable water use in connection with USARE’s Round Top Project (including, without limitation, mineral processing and metal extraction/processing). The Groundwater Lease will expire concurrently with the M-113117 Mineral Lease. The Company has not commenced water production and is currently obligated to pay annual delay rentals in the amount of $6,500 on or before each anniversary of the effective date of the Groundwater Lease. On the first anniversary of the Effective Date that immediately follows the Company’s commencement of water production from the leased premises the Company shall make a production payment equal to the greater of (1) $1,667.67 multiplied times the number of months of production of water during the 12-month period ending 60 days before the production payment is due, or (2) $0.95 per 1,000 gallons of the gross volume of water produced by the leased premises covered by the lease during the 12-month period ending 60 days before the production payment is due. On each anniversary of the effective date of the Groundwater Lease thereafter during the remaining term of the Groundwater Lease, the Company will be required to make a production payment equal to the greater of (1) $20,000, or (2) $0.95 per 1,000 gallons of the gross volume of water produced from the leased premises during the 12-month period ending 60 days before the production payment is due. There is no Company renewal option under the Groundwater Lease and any renewal of the Groundwater Lease is at the sole discretion of the GLO.

The premises leased under the Groundwater Lease has two existing water wells. Prior to commencing production of rare earth minerals at the Round Top Project, the Company will need to establish that the existing wells are functioning water wells producing enough water to support production or potentially drill additional wells, which would entail additional expense for production. If the Company determines that the groundwater supply is not suitable for the Company’s Round Top Project, then the Company has the right to terminate the Groundwater Lease. Upon expiration or earlier termination of the Groundwater Lease, the Company will be required to restore the leased premises to its original topographical condition that existed as of the Effective Date, to the extent the topographical condition has been altered.

The Company has entered into four easements with GLO that affect the Round Top Project. The first easement is Miscellaneous Easement ME20210085 (“ME20210085”), which commenced on April 1, 2021 and expires on March 31, 2031 unless extended by the Company pursuant to the terms of ME20210085. ME20210085 is a nonexclusive easement for a right of way to construct, maintain, operate, inspect and repair one roadway in a location set forth on the easement.

The second easement is Miscellaneous Easement (Pipelines) ME20210086 (“ME20210086”), which commenced on April 1, 2021 and expires on March 31, 2031 unless extended by the Company pursuant to the terms of ME20210086. ME20210086 is a nonexclusive easement for a right of way to construct, maintain, operate, inspect, repair, change the size of, and replace one 4.5-inch O.D. pipeline for the purpose of transporting fresh water in a location set forth on the easement.

The third easement is Miscellaneous Easement ME20210087 (“ME20210087”), which commenced on April 1, 2021 and expires on March 31, 2031 unless extended by the Company pursuant to the terms of ME20210087. ME20210087 is a nonexclusive easement for a right of way to construct, maintain, operate, inspect and repair one 24-kV electric line in a location set forth on the easement.

The fourth easement is Miscellaneous Easement ME20220142 (“ME20220142”), which commenced on September 1, 2022 and expires on August 31, 2032 unless extended by the Company pursuant to the terms of ME20220142. ME20220142 is a nonexclusive easement for a right of way to construct, maintain, operate, inspect and repair one roadway in a location set forth on the easement.

*Historical Non-Item 1300 Resource Estimates; Feasibility Studies.* Cyprus established certain non-reported resources in conjunction with a 1988 internal feasibility study, which historical resource estimate would not qualify as a resource by either historical 43-101 standards nor current Item 1300 of Regulation S-K (“Item 1300”) standards. In 2012, TMRC completed a PEA prepared by a mining consulting firm on the Round Top Deposit (NI 43-101 Preliminary Economic Assessment — Round Top Project, June 22, 2012). The resource model in that PEA was updated in early 2013 with additional drilling and assay data and was documented in a resource statement by a mining consulting firm (Resource Estimate and Statistical Summary — Round Top Project, September 30, 2013). The 2013 PEA was an update of the 2012 PEA and utilized the resource estimate from the September 2013 study. The 2013 PEA was then superseded in 2019 when USARE and TMRC engaged a mining consulting firm to prepare its resource statement (NI 43-101 Preliminary Economic Assessment — Round Top Project, August 16, 2019). Neither the 2012 PEA, the 2013 PEA, nor the 2019 PEA were prepared on the basis of compliance with Item 1300 and are not resource estimates of USARE under Item 1300.

The 2019 PEA provided an initial overview of the Round Top Deposit’s minerology, confirming that the site contains both heavy rare earths and lithium. While the 2019 PEA set the stage for further detailed studies, in light of the rapid global economic changes, technological changes that have occurred since 2019, and changes in economic environment and pricing, including with respect to extraction costs and economic returns, the Company is not relying on the 2019 PEA for the purpose of reporting mineral resources. The Company does not currently intend to update the 2019 PEA and is instead working toward conducting a pre-feasibility study (“PFS”). The Company intends to update the “flow sheet” used as a key input in such estimates to reflect the Company’s expected separation and processing methodologies at that time. USARE does not make any representation that any historical estimate is a current mineral resource estimate for the Round Top Project. There is no known significant production reported from previous operators.

Accordingly, following the 2019 PEA, USARE has been actively working on advancing the project through the next stages of the project, focusing on the subsequent PFS, which the Company intends to eventually progress to a Definitive Feasibility Study (“DFS”). The PFS would provide an updated and more detailed analysis of the technical and economic feasibility of the Round Top Project, including resource modeling, mine design, and processing methodologies. This step is critical in defining and refining the operational and financial plans for the Round Top Project. The final stage, the DFS, would provide the most definitive plan for the full-scale development of the mine, including final cost estimates, engineering plans, and potential environmental impacts, all necessary for securing financing and moving toward full production.

*Exploration Status.* It is the Company’s view that the Round Top Project is considered an “exploration stage property” under Item 1300, in that the Round Top Project is a property that has no mineral reserves disclosed. Mineral resources that are not mineral reserves have no demonstrated economic viability. USARE has not itself conducted any exploration activities at the Round Top Project and does not have any current determination as to a proposed program of exploration or development. However, as discussed above in the section entitled “— *History”*, various other parties have historically performed exploration activities at the site, including TMRC from whom USARE acquired its rights in the Round Top Project through the Company’s subsidiary RTMD. Between January 2010 and August 2019, TMRC conducted the following exploration activities: surface sampling, logging cuttings from historical reverse circulation drilling, aeromagnetic surveying, anaeroradiometric survey, stream sediment surveying, gravity surveying, and exploratory drilling. To date, 173 historical drill holes have been located, and, between 2011 and 2019, TMRC drilled 84 reverse circulation holes and 2 core holes and analyzed 3,081 drill samples. In early 2019, TMRC assayed previously collected RC samples to collect geochemical data for some additional elements from existing drill holes to expand the knowledge of lithium, zircon, and other elements which metallurgical test work had indicated might impact project economics.

The Round Top Project’s equipment and facilities and related infrastructure are in generally good condition and are not material to the Company’s business as currently conducted.

For information regarding current and expected future permitting requirements and associated timelines and information regarding such permits, see the section entitled “— *Permits and Approvals”.*

*Environmental Impact.* The Round Top Project has been envisioned with an emphasis on minimizing environmental impact, particularly in comparison to traditional mining operations. One of the key environmental advantages of the Round Top Project’s site is its location in an arid, sparsely populated area of Texas, which reduces the likelihood of significant impacts on local communities or ecosystems. Due to the above-ground nature of the deposit, the project is currently expected to predominantly utilize in-situ leaching for rare earth extraction, which is generally considered less environmentally disruptive than traditional mining techniques. This process involves dissolving minerals using solutions and extracting them without large-scale surface disruption, reducing the need for large open-pit mining operations that could potentially lead to undesirable environmental impacts.

Additionally, USARE endeavors to use sustainable practices by focusing on using closed-loop recycling systems to minimize waste and reduce water usage in its operations. The Company is exploring the possibility of using renewable energy sources to power its projects. However, like all mining operations, in the future, the Company will likely need to manage concerns related to chemical use, water management and contamination, and waste management.

## Risk factors

As filed, 111,026 characters.

*An investment in our securities involves a high degree of risk. You should consider carefully all of the risks described below, together with the other information contained in this Annual Report, before making a decision to invest in our securities. If any of the following events occur, our business, financial condition and operating results may be materially adversely affected. In that event, the trading price of our securities could decline, and you could lose all or part of your investment.*

### Risks Related to Our Business and Industry

***The Stillwater Facility is under development and is not yet completed, we have not commenced producing and selling neo magnets, and we have no history in commercial operations and the lack of commercial operations limits the accuracy of any forward-looking forecasts, prospects or business outlook or plans.***

We have not commenced production of neo magnets at our Stillwater Facility, and we may not be able to secure the necessary feedstock, offtake, or equipment in order to economically produce neo magnets, including from the Round Top Project. We have not realized any revenues to date from the sale of neo magnets or critical minerals, rare earth minerals, or lithium, and our operating cash flow needs have been financed through the incurrence of debt and equity raises and not through cash flows derived from our operations. As a result, we have little historical financial and operating information available to help you evaluate our performance. Any profitability in the future from our business will be dependent upon economical development of the Stillwater Facility and production of neo magnets, which is subject to numerous risk factors. Accordingly, we may not realize profits, including in the medium to long term. Additional expenditures are required to construct, complete and install additional neo magnet production equipment and our neo magnet production capabilities might not be able to fully utilize the nameplate capacity of the equipment. In addition, we have no operating history upon which to base estimates of future operating costs and capital requirements. Actual operating costs and economic returns of any and all of our Projects may materially differ from the costs and returns estimated, and accordingly our financial condition, results of operations and cash flows may be negatively affected. In the near term, our development and growth depends on our ability to: (i) successfully produce magnets at the Stillwater Facility; (ii) secure one or more reliable sources of rare earth feedstock at prices that are acceptable and attractive to us; and (iii) secure one or more neo magnet customers that are willing and able to purchase our neo magnets at prices that are expected to be profitable for us. Delays in the completion of the Stillwater Facility or the Round Top Project could have a material adverse effect on our business, results of operations and financial condition.

***We may not be able to generate positive cashflow from our expected future business operations. Our long-term success will depend on implementing the business strategy and operational plan of the Company, as well as our ability to generate revenues, achieve and maintain profitability and develop positive cash flows from our magnet production.***

Our ability to continue with our business plan to produce and sell neo magnets and our future plans regarding the Round Top Project, ultimately depends on our ability to generate revenues, achieve and maintain profitability, and generate positive cash flow from our operations. We cannot assure you that our Projects will result in achieving and maintaining profitability and developing positive cash flows. The economic viability of the Company’s future business activities has many risks and uncertainties including, but not limited to:

- a significant, prolonged decrease in the price of neo magnets;
- difficulty in marketing and/or selling neo magnets;
- significantly higher than expected capital costs to construct and commission our Projects;
- significantly higher than expected feedstock costs to support magnet production in the near term until the Round Top Project is capable of satisfying our feedstock needs;
- significant delays, reductions or stoppages of production activities;
- shortages of adequate and skilled labor or a significant increase in labor costs;
- the introduction of significantly more stringent regulatory laws and regulations and associated delays in permitting; and
- delays in the availability of necessary equipment, including construction or production equipment.

Our future business activities may change as a result of any one or more of these risks and uncertainties.

***We may experience time delays, unforeseen expenses, increased capital costs, and other complications while developing our Projects, these could delay the start of revenue-generating activities and increase development costs.***

The production of neo magnets and mineral exploration and mining by their nature involve significant risks and hazards, including environmental hazards, as well as industrial and mining accidents. These include, for example, occupational hazards, leaks, ruptures, explosions, chemical spills, seismic events, fires, cave-ins and blockages, flooding, discharges of gasses and toxic substances, contamination of water, air or soil resources, unusual and unexpected rock formation affecting mineralization or wall rock characteristics, ground or slope failures, rock bursts, wildfires, radioactivity and other accidents, incidents, or conditions resulting from mining or manufacturing activities, including, among others, blasting and the transport, storage and handling of hazardous materials. In particular, the production of neo magnets involves the use of heavy equipment and operations at high temperatures. These operations can be dangerous and safety incidents in these operations may cause damage to and loss of equipment, injury or death, monetary losses and potential legal liabilities. Any such incidents could have a material adverse effect on our business, operating results and financial condition. Furthermore, there is the risk that relevant regulators may impose fines and work stoppages for non-compliant production or mining operating procedures and activities, which could reduce or halt production or mining until lifted. The occurrence of any of these events could delay or halt production, increase production costs and result in financial and regulatory liability for us, which could have a material adverse effect on our business, results of operations and financial condition. In addition, the relevant environmental authorities have issued and may issue administrative directives and compliance notices in the future, to enforce the provisions of the relevant statutes to take specific anti-pollution measures, continue with those measures and/or to complete those measures. The authorities may also order the suspension of part, or all of, our operations if there is non-compliance with legislation. Contravention of some of these statutes may also constitute a criminal offense and an offender may be liable for a fine or imprisonment, or both, in addition to administrative penalties. As a result, the occurrence of any of these events may have a material adverse effect on our business, results of operations and financial condition.

***Until our Round Top Project is capable of satisfying our feedstock needs, if ever, our business is subject to the availability of rare earth oxide and metal feedstock, in quantities and prices that allow us to develop and commercially operate our Stillwater Facility.***

Our Round Top Project is in its exploration stage and is not currently able to satisfy the feedstock needs necessary for the development and commercial operation of our Stillwater Facility and may never be able to do so. Unless and until our Round Top Project is capable of satisfying our feedstock needs, we will be required to enter into feedstock supply agreements with third-parties. We are in the process of pursuing feedstock supply and offtake arrangements with potential counterparties in an effort to provide adequate sources of feedstock for the purchase of all or substantially all of our production from our Stillwater Facility, once operational, on terms favorable to us. As discussed elsewhere in this Annual Report, we have executed feedstock supply agreements with two counterparties. However, they may not be able to provide all of the feedstock which we may require or at economical prices. If we are unable to secure supply agreements that ensure that all of our feedstock needs are met or if we are able to secure such agreements but the counterparties fail to meet their obligations, we may not achieve our goals. If this happens, our results of operations and financial condition could be materially and adversely affected.

***We may be adversely affected by fluctuations in demand for, and prices of, neo magnets, magnet materials, and necessary feedstock.***

Because our revenue is, and will for the foreseeable future be, derived from the production and sale of neo magnets, changes in demand for, and the market price of, and taxes and other tariffs and fees imposed upon such products and their inputs could significantly affect our profitability. Our financial results may be significantly adversely affected by declines in the prices of neo magnets or increases in the prices of necessary feedstock. Neo magnet prices may fluctuate and are affected by numerous factors beyond our control such as interest rates, exchange rates, taxes, tariffs, inflation or deflation, fluctuation in the relative value of the U.S. dollar against foreign currencies on the world market, shipping and other transportation and logistics costs, global and regional supply and demand for neo magnets, potential industry trends, such as competitor consolidation or other integration methodologies, and the political and economic conditions of countries that produce and procure neo magnets. Furthermore, supply side factors have a significant influence on price volatility for critical and rare earth minerals, necessary feedstock, and neo magnet prices. Supply of rare earth minerals, necessary feedstock, and neo magnets is currently dominated by Chinese producers. The Chinese Central Government regulates production via quotas and environmental standards and has and may continue to change such production quotas and environmental standards. Periods of over supply or speculative trading of critical and rare earth minerals can lead to significant fluctuations in the market price of critical and rare earth minerals.

In contrast, extended periods of high commodity prices may create economic dislocations that may be destabilizing to critical and rare earth minerals supply and demand and ultimately to the broader markets. While some periods of high critical and rare earth mineral market prices generally are beneficial to our financial performance if we are producing rare earth minerals, if ever, or if magnet prices rise in concert with such higher mineral prices, strong critical and rare earth mineral prices however also create economic pressure to identify or create alternate technologies that ultimately could depress future long-term demand for neo magnets or increase our feedstock costs, and at the same time may incentivize development of competing mining properties.

Additionally, because the Company is heavily dependent on third parties for feedstock, changes in the demand for, the market price of, or taxes, tariffs, or other fees imposed on such feedstock may affect our ability to acquire our supply needs at an economical price. Changes in the price of feedstock could materially and adversely affect our operations and ultimate financial results.

***We may not be able to convert current commercial discussions and/or memorandums of understanding with customers for the sale of our neo magnets and other products into definitive contracts, which may have a negative effect on our business.***

We do not currently have any contractually committed customers for the planned output and delivery of neo magnets. We are actively working on completing our Stillwater Facility which will, once completed, have the capability to produce neo magnets. Our success depends on our ability to generate revenue and operate profitably, which depends in part on our ability to identify target customers and convert such contacts into meaningful orders or expand on current customer relationships. We do not currently have any revenue or definitive off-take or sales agreements with customers in place. Although we are in periodic discussions with potential customers regarding potential offtake agreements, there is no assurance that the parties will be able to reach an agreement or that we will be able to produce and deliver the required neo magnets in accordance with the customer’s required specifications and timing requirements. If we are unable to negotiate, finalize and maintain such agreements and satisfy the conditions thereto in order to enter into definitive agreements, or are only able to do so on terms that are unfavorable to us, we will not be able to generate any revenue, which would have a material adverse effect on our business, prospects, operating results and financial condition.

We anticipate that in some cases our products will be delivered to certain customers on an early trial deployment basis, where such customers have the ability to evaluate whether our products meet their performance requirements before they commit to meaningful orders of our products. If our targeted customers do not commit to making meaningful orders, or at all, it could adversely affect our business, prospects and results of operations. Our customers may require protections in the form of price reductions and similar arrangements that allow them to require us to deliver additional product or reimburse them for losses they suffer as a result of our late delivery or failure to meet agreed upon performance specification. Delays in delivery of our products, unexpected performance problems or other events could cause us to fail to meet these contractual commitments, resulting in delays in obtaining necessary materials used in our production process, defects in material or workmanship or unexpected problems in our manufacturing process, which could lead to unanticipated revenue and earnings losses and financial penalties. The occurrence of any of these events could harm our business, prospects, results of operations and financial results.

Prior to reaching expected production rates at the Stillwater Facility, we intend to enter into short- and long-term sales contracts with new customers. However, there can be no assurance that these customers will enter into sales contracts for our products. Even if we do enter into offtake and/or sales agreements, we may fail to deliver the product required by such agreements or may experience production costs in excess of the fixed price to be paid to us under such agreements. The failure to enter into such contracts may have a material adverse effect on our financial position and results of operations.

***The success of our business will depend, in part, on the growth of existing and emerging uses for neo magnets.***

Our strategy is to produce and sell neo magnets, which are used in existing and emerging technologies, such as hybrid and electric vehicles, wind turbines, robotics, medical equipment, military equipment and other high-growth, advanced motion technologies. The success of our business accordingly depends on the continued growth of these end markets and successfully commercializing neo magnets, in such markets. If the market for these existing and emerging technologies does not grow as we expect, grows more slowly than we expect, or if the demand for our products in these markets decreases, then our business, prospects, financial condition and operating results could be harmed. In addition, the market for these technologies, particularly in the automotive and wind turbine industry, tends to be cyclical, which exposes us to increased volatility, and it is uncertain as to how such macroeconomic factors will impact our business.

A prolonged or significant economic contraction in the United States or worldwide could put downward pressure on market prices of neo magnets. Protracted periods of low prices for neo magnets could significantly reduce revenues and the availability of required development funds in the future. This could cause substantial reductions to, or a suspension of, magnet production operations, impair asset values and reduce our results of operations and financial condition.

Demand for our products may be impacted by demand for downstream products incorporating neo magnets, including hybrid and electric vehicles, wind turbines, robotics, medical equipment, military equipment and other high-growth, advanced motion technologies, as well as demand in the general automotive and electronic industries. Lack of growth or changes in these markets may adversely affect the demand for our products. Any unexpected costs or delays in the commercialization of neo magnets or any of our other expected products, or less than expected demand for the critical existing and emerging technologies that use neo magnets, could have a material adverse effect on our financial condition or results of operations.

***An increase in the global supply of neo magnets or, dumping, predatory pricing and other tactics by our competitors or state actors may adversely affect our profitability.***

The pricing and demand for neo magnets is affected by a number of factors beyond our control, including growth of economic development and the global supply and demand for neo magnets. China is projected to continue to account for a substantial portion of global neo production in the near future. China dominates the manufacture of metals and neo magnets from rare earths, capabilities that are not currently materially present in the United States, and the Chinese Central Government regulates production via quotas and environmental standards. Over the past few years, there has been significant restructuring of the Chinese markets in line with China Central Government policy. Assuming that we reach anticipated production rates for neo magnets and other planned downstream products and subsequently become fully operational and integrated, increased competition may lead our competitors to engage in predatory pricing or other behaviors designed to inhibit our further downstream integration. Any increase in the amount of neo magnets or related products available in the market, including those exported from other nations would result in increased competition and may result in price reductions, reduced margins or loss of potential market share, any of which could materially adversely affect our profitability. As a result of these factors, we may not be able to compete effectively against current and future competitors.

***The Round Top Project is at the exploration stage and we have not commenced construction or commission of the mine nor related facilities, and the development of the Round Top Project into a producing mine is subject to a variety of risks, any number of which may cause the development of the Round Top Project into a producing mine to not occur, be delayed, or not result in the commercial extraction of minerals.***

We do not have declared mineral resources as defined under Item 1300 and has not yet begun to extract minerals from the Round Top Project. The Round Top Deposit might not be able to be commercially mined and our ongoing exploration programs may not result in the development of profitable commercial mining operations. Few properties or deposits that are explored are ultimately developed into producing mines. Major expenses will be required to complete the Round Top Project. We may not be able to develop the Round Top project into an operating mine and doing so may not result in the commercial extraction of mineral deposits. There are many factors that may result in the Round Top Project not reaching completion or production, including failure to obtain adequate funding, failure to successfully complete a pre- or a definitive feasibility study that the project could profitably produce rare earth minerals, failure to meet lease related timelines, failure to satisfy other operational risks regarding obtaining adequate power, water, expertise and human resources, failure to obtain and sustain the necessary permits for operations and other aspects of the business of operating the Round Top Project. We may never reach commercial or profitable production of rare earth minerals. Even if the Round Top Project is mined, we may not realize profits from our exploration or development activities in the short, medium, or long term. The actual risks that we will face in the future in connection with the Round Top Project are unknown at this time, but may include:

- The preliminary and definitive feasibility studies, when delivered, may not support the economic viability of the Round Top Project moving forward, and the assumptions used in the studies to underpin the viability of the Round Top Project (including, but not limited to, the prices of critical minerals, rare earth minerals or lithium) may not remain accurate in the future.
- We are in the process of developing a flow sheet with respect to the processing of rare earth minerals from our assets in the Round Top Project, but we may not be able to do so. If we are unable to develop a flow sheet that results in profitable production, our business and results of operations may be harmed.
- An increase in the global supply of rare earth magnets or critical and rare earth minerals and lithium related products, dumping, predatory pricing and other tactics by our competitors or state actors may adversely affect our profitability.
- When compared to many industrial and commercial operations, mining exploration and development projects are high risk and subject to uncertainties. Each mineral resource is unique and the nature of the mineralization, and the occurrence and grade of the minerals, as well as behavior of the mineral resource during mining, are unpredictable. Any mineral resource estimates may be materially different from mineral quantities we may recover, any life-of-mine estimates may prove inaccurate and market price fluctuations and changes in operating and capital costs may render mineral resources uneconomic to mine. Uncertainty and/or error in our estimates of minerals in the Round Top Deposit could result in lower-than-expected revenues and higher-than-expected costs.
- The mining and production of rare earth and critical minerals and lithium and related products is a highly competitive industry in a high demand and growth environment and additional rare earth and critical mineral and lithium manufacturing, refining and mining competitors could result in a reduction in revenue.
- The imposition of tariffs related to rare earths and other critical minerals and a resulting trade dispute could disrupt the market for our products.
- The mining and production of rare earth and critical minerals and lithium and related products is a capital-intensive business that requires the commitment of substantial resources; if we do not have sufficient capital or resources to provide for such activities, it could negatively impact our business.
- The performance of the Round Top Project will depend on its ability to reach favorable production rates for the separation of rare earths.
- The revenue generated by the Round Top Project may be negatively impacted by possible competition from substitutions for critical and rare earth minerals and lithium.
- Our continued growth depends on our ability to obtain commercial deployment of our mineral processing and purification technology, or the identification of third-party technologies or processes, and the ability of any such technology and/or processes to efficiently process and purify one or more feedstocks of mixed rare earth mineral concentrates.
- Actual capital costs, operating costs, production and economic returns may differ significantly from those we have anticipated, and future development activities may not result in profitable mining, processing or production operations.
- The Round Top Project has no operating history on which to base estimates of future operating costs and capital requirements. Before operations commence, any projections we may produce are based upon estimates and assumptions made at the time they were prepared. If these estimates or assumptions prove to be incorrect or inaccurate, our actual operating results may differ materially from any forecasted results.
- Our resource estimates, if any, may change significantly when new information or techniques become available. In addition, by their very nature, resource estimates are imprecise and depend to some extent on interpretations, which may prove to be inaccurate. As further information becomes available through additional fieldwork and analysis, our estimates, if any, are likely to change and these changes may result in a reduction in our resources. These changes may also result in alterations to our development and mining plans, which may, in turn, adversely affect our operations.
- We face opposition from organizations that oppose mining which may disrupt or delay our Round Top Project.
- We will be required to obtain and sustain governmental permits and approvals to develop and operate the Round Top Project, a process which is often costly, time-consuming and somewhat uncertain as to outcome. These permits may include permits related to disposal of radioactive mineral waste, which will depend on how we conduct our processing operations in the future as well as what thresholds (regarding whether a permit is required or not) are set by the government at that point in time. Failure to obtain or retain any necessary permits or approvals for our planned operations may negatively impact our business.
- Our mining rights are held by one of our subsidiaries, which as of December 31, 2024, is owned approximately 81% by the Company and approximately 19% by a minority member of the applicable subsidiary. If the minority member does not meet its capital contribution requirements, then we would need to raise additional funds to cover the minority member’s shortfall in connection with the Round Top Project in exchange for additional equity in the subsidiary. Additionally, if the value of the equity of the minority member increases then the rate of dilution of the minority member’s equity in the subsidiary will decrease. Further, our interests may not align at all times with such minority member and divergence of interests may negatively impact our business.
- A third-party has obtained prospecting permits from the GLO for land in close proximity to our Round Top Project, including land for which we have an active surface lease. There is a possibility for the third-party to convert such prospecting permits into mineral leases and, if converted, such mineral leases would potentially impact our ability to conduct our operations as currently planned.
- Land reclamation and mine closure may be burdensome and costly.
- Because of the dangers involved in the mining of minerals, there is a risk that we may incur liability or damages as we conduct our business.
- We and our management do not have experience operating a mine and may not have a complete or accurate understanding of the risks we may face in the future related to the Round Top Project.

***We operate in a highly competitive industry in a high demand and growth environment and additional manufacturing, refining and mining competitors could result in a reduction in revenue.***

The rare earth magnet production and critical and rare earth minerals mining and processing markets are capital intensive and competitive. Production of neo magnets, and critical and rare earth minerals is dominated by our Chinese competitors. These competitors may have greater financial resources, as well as other strategic advantages to operate, maintain, improve and possibly expand their facilities. Additionally, our Chinese competitors have historically been able to produce at relatively low costs due to domestic economic and regulatory factors, including less stringent environmental and other governmental regulations and lower labor and benefit costs. For instance, many of our Chinese competitors dispose of the waste material from beneficiation in wet tailings dams, which are significantly less expensive to operate and potentially more harmful to the environment than the dry tailings method that we would expect to employ. Even upon successful completion of our planned business stages and/or Projects, if we are not able to achieve our anticipated costs of production, then any strategic advantages that our competitors may have over us, including, without limitation, lower labor, compliance and production costs, could have a material adverse effect on our business.

Some of our competitors have made, or may make, acquisitions or enter into partnerships or other strategic relationships to achieve competitive advantages. In addition, new entrants not currently considered competitors may enter our market through acquisitions, partnerships or strategic relationships. We expect these trends to continue as demand for neo magnets and critical and rare earth materials increases. Industry consolidation may result in competitors with more compelling product offerings or greater pricing flexibility than we have, or business practices that make it more difficult for us to compete effectively, including on the basis of price, sales, technology or supply. These competitive pressures could have a material adverse effect on our business.

***Changes in China’s or the United States’ political environment and policies, including changes in export/import policy may adversely affect our business.***

Because of the current dominance of China in the critical and rare earth minerals industry, the possibility of adverse changes in trade or political relations with China, political instability in China, increases in labor or shipping costs, the occurrence of prolonged adverse weather conditions or a natural disaster such as an earthquake or typhoon, or the outbreak of another global pandemic disease like COVID-19 could severely interfere with our industry and would have a material adverse effect on our operations.

Our sales may be adversely affected by the current and future political environment in China and the policies of the China Central Government. China could oversupply our markets in the United States and elsewhere with either cheaper magnet products or rare earth minerals or feedstock. China has historically heavily subsidized its domestic rare earth producers with respect to both rare earth feedstock and magnets. The United States government has called for substantial changes to foreign trade policy with China and has from time to time raised (as well as has proposed to further raise in the future), tariffs on several Chinese goods. China has at times retaliated with increased tariffs on United States goods, or the ban of exports of rare earth technologies and feedstock to other countries such as the United States. While some impacts of Chinese trade policy may be beneficial for our business, any changes in United States trade policy could trigger retaliatory actions by affected countries, including China, resulting in trade wars which could likely result in increased volatility in the prices of rare earth and critical minerals, necessary feedstock, and neo magnets. Furthermore, unless and until these dynamic changes in favor of the increased competitiveness of domestic production, domestic production may not be economically viable in the global market place. As we are heavily dependent upon third-party feedstock unless and until our Round Top Project becomes a producing mine capable of satisfying our feedstock needs, if ever, and as China currently dominates the global supply of rare earth feedstock necessary for the production of neo magnets, any changes in United States and China relations, including through changes in policies by the Chinese government could adversely affect our financial condition and results of operations, including: changes in laws, regulations or the interpretation thereof, confiscatory taxation, governmental royalties, restrictions on currency conversion, imports or sources of supplies, or the expropriation or nationalization of private enterprises.

***The production of neo magnets is a capital-intensive business that requires the commitment of substantial resources; if we do not have sufficient capital or other resources necessary to provide for such production, it could negatively impact our business.***

Neo magnet production requires large amounts of capital, and long-term production and processing requires significant capital investment, working capital, and ongoing maintenance expenditure. We expect to materially increase our capital expenditures and working capital requirements to begin production of neo magnets and support the growth of our business and operations. We do not currently have sufficient capital to fund our anticipated capital expenditures. We will need to raise additional capital (debt or equity) to complete or fund our Projects. Our business plan is based on, among other things, expectations as to capital expenditures and if we are unable to fund those capital expenditures or the level of necessary capital expenditures increases above our current expectations, we will not achieve the targets set forth in our business plan or be able to develop currently contemplated or future capital projects or be able to continue production at cost-effective levels. We may not be able to raise additional capital (debt or equity) to complete or fund our projects. Furthermore, any such reduction in capital expenditure may cause us to forego some of the benefits of any future increases in commodity prices, as it is generally costly or impossible to resume production immediately or complete a deferred expansionary capital expenditure project once delayed, which may adversely affect our results of operations or financial condition.

***The amount of capital required for completion and build-out of our Projects may increase materially from our current estimates, and we expect to raise further funds through equity or debt financing, joint ventures, production sharing arrangements or other means. Consequently, we depend on our ability to successfully access the capital and financial markets. Any inability to access the capital or financial markets may limit our ability to fund our ongoing operations, execute our business plan or pursue investments that we may rely on for future growth.***

Until commercial production is achieved from our Projects, we will continue to incur operating and investing net cash outflows associated with including, but not limited to, build out and growth of our Stillwater Facility, maintaining and acquiring properties, undertaking ongoing activities and the funding obligations to develop the assets of our Projects. We will require additional capital to fund our ongoing operations, complete our Stillwater Facility, and — in connection with our Round Top Project — explore and define rare earth mineralization and establish any future mining or rare earth manufacturing operations. Such additional funding may not be available to us on satisfactory terms, or at all.

In order to finance our future ongoing operations and future capital needs, we will require additional funds through the issuance of additional equity or debt securities. Depending on the type and terms of any financing we pursue, shareholders’ rights and the value of their investment in our ordinary shares could be reduced. Any additional equity financing will dilute shareholdings. If the issuance of new securities results in diminished rights to holders of our ordinary shares, the market price of our ordinary shares could be negatively impacted. New or additional debt financing, if available, may involve restrictions on financing and operating activities. In addition, if we issue secured debt, the holders of the debt would have a claim to our assets that would be prior to the rights of shareholders until the debt is paid. Interest on such debt would increase costs and negatively impact operating results.

If we are unable to obtain additional financing, as needed, at competitive rates, our ability to fund our current operations and implement our business plan and strategy will be affected, and we would be required to reduce the scope of our operations and scale back our exploration, development and mining programs. There is, however, no guarantee that we will be able to secure any additional funding or be able to secure funding which will provide us with sufficient funds to meet our objectives, which may adversely affect our business and financial position. Certain market disruptions may increase our cost of borrowing or affect our ability to access one or more financial markets. Such market disruptions could result from:

- adverse economic conditions, including inflationary factors and recessionary fears;
- adverse general capital market conditions, including rising interest rates;
- poor performance and health of the neo magnets industry in general;
- bankruptcy or financial distress of neo magnet companies or marketers;
- significant decrease in the demand for neo magnets; or
- adverse regulatory actions that affect our exploration and construction plans or the use of our current and planned products generally.

If additional capital is not available in sufficient amounts or on a timely basis, the Company will experience liquidity problems, and the Company could face the need to significantly curtail current operations, change our planned business strategies and pursue other remedial measures. Any curtailment of business operations would have a material negative effect on operating results, the value of the Company’s outstanding common and preferred shares and the Company’s ability to continue as a going concern.

***Any failure by management to manage growth properly could negatively impact our business.***

Future growth may place strains on our financial, technical, operational and administrative resources and cause us to rely more on project partners and independent contractors, thus, potentially adversely affecting our financial position and results of operations. We may not be successful in upgrading our technical, operational and administrative resources or increasing our internal resources sufficiently to provide certain of our services currently provided by third parties or which will be necessary in the future. Our inability to achieve or manage growth may materially and adversely affect our business, results of operations and financial condition.

***A power or other utility disruption or shortage at our Projects could temporarily delay operations and increase costs, which may negatively impact our business.***

Our facilities currently rely on electricity and other utilities each provided by a single utility company in West Texas and North-Central Oklahoma, respectively. Instability in electrical or other utility supply could cause sporadic outages and brownouts. Any such outages or brownouts could have a negative impact on our production. As a result, our revenue could be adversely impacted and our relationships with our customers could suffer, adversely impacting our ability to generate future revenue and otherwise perform our contractual obligations. In addition, if power to any of our Projects is disrupted during certain phases of our production processes, we may incur significant expenses that may adversely affect our business.

***Increasing costs, including rising electricity and other utility costs, or limited access to raw materials may adversely affect our profitability.***

We use significant amounts of electricity and other utilities, including water, in our operations at our Projects and such usage will increase as we increase production. We also use significant amounts of raw materials, whether rare earth feedstock or other raw materials such as chemical reagents used to process rare earth oxides. We will need to purchase utilities and raw materials in the open market and as a result, we could be subject to significant volatility in cost and availability. We may not be able to pass increased prices of such utilities or raw materials through to our customers in the form of price increases. If the Round Top Project is not completed, operative, and commercial, we will be wholly reliant on third-party sources for feedstock for neo production which could be costly and damaging to results of operations. A significant increase in the price or decrease in the availability of these utilities or raw materials, could materially increase our operating costs and adversely affect our profit margins and production volumes.

***Fluctuations in transportation costs or disruptions in transportation services or damage or loss during transport could decrease our competitiveness or impair our ability to deliver products to our customers.***

We will need to transport our products to our future customers wherever they may be located. Finding affordable and dependable transportation is important because it allows us to supply customers around the world. Labor disputes, embargos, government restrictions, work stoppages, pandemics, derailments, damage or loss events, adverse weather conditions, other environmental events, changes to rail or ocean freight systems or other events and activities beyond our control could interrupt or limit available transport services, which could result in customer dissatisfaction and loss of sales potential and could materially adversely affect our results of operations.

***We will need to produce our products to exacting specifications in order to provide future customers with a consistently high-quality product. An inability to meet individual customer specifications would negatively impact our business.***

Upon commencing commercial operations at our Stillwater Facility, we need to produce neo magnets to meet customer needs and specifications and to provide customers with a consistently high-quality product and to meet ever-stricter purity requirements. An inability to perfect the neo magnet production process to the level necessary in order to meet individual customer specifications may have a material adverse effect on our financial condition or results of operations. In addition, customer needs and specifications may change with time. Any delay or failure in developing processes to meet changing customer needs and specifications may have a material adverse effect on our financial condition or results of operations. Additionally, natural disasters, could also impact the facilities of our customers, which could have a material adverse effect on our ability to deliver our product to our customers or our customer’s demand for our products.

### Diminished access to water may adversely affect our operations.

Processing of rare earth oxides requires significant amounts of water. Any disruption in the process or loss of access to adequate water sources could prompt the need for significant access to fresh water. Additionally, once we complete the Round Top Project and our Stillwater Facility, we will require an even greater amount of water for our separation and extraction operations, including additional fresh water. With respect to the Round Top Project, we maintain and operate one water supply well field, which currently contains two wells, for potable and process water and own and/or lease land and wells in another water supply well field that we may be able to operate in the future. Any disruption to our current process or decrease in available water supply may have a material adverse effect on our operations and our financial condition or results of operations. In addition, future regulation or industry best practices may require more complex water reuse and recycling processes, which may increase operating costs.

***Work stoppages or similar difficulties, breakdown in labor relations, or a shortage of skilled technicians and engineers could significantly disrupt our operations and reduce our revenues.***

A work stoppage by any of the third-parties providing services in connection with construction at our Projects could significantly delay our Projects, especially our Stillwater Facility, and disrupt our operations, reduce our revenues and materially adversely affect our results of operations. Efficient production of critical minerals and rare earth products using modern techniques and equipment requires skilled technicians and engineers. In addition, our optimization and eventual downstream efforts will significantly increase the number of skilled operators, maintenance technicians, engineers and other personnel required to successfully operate our business. In the event that we are unable to hire, train and retain the necessary number of skilled technicians, engineers and other personnel there could be an adverse impact on our labor costs and our ability to reach anticipated production levels in a timely manner, which could have a material adverse effect on our results of operations.

***We depend on key personnel for the success of our business. If we fail to retain our key personnel or if we fail to attract additional qualified personnel, we may not be able to achieve our desired level of growth and our business could suffer.***

We highly value and depend on the contributions of our senior management and key personnel, particularly our experts with respect to magnet production. Our success continues to depend largely upon the performance of key officers, employees and consultants who have advanced us to our current stage and contributed to our potential for future growth. The market for qualified talent has become increasingly competitive, with shortages of qualified talent relative to the number of available opportunities being experienced in all markets where we conduct our operations. The ability to remain competitive by offering higher compensation packages and programs for growth and development of personnel, with a view to retaining existing talent and attracting new talent, has become increasingly important to us and our operations in the current climate. We may not be able to replace our senior management or key personnel (including personnel that are key to magnet production) with persons of equivalent expertise and experience within a reasonable period of time or at all if one or more of our senior management and key personnel are not retained, and we may incur additional expenses to recruit, train and retain additional personnel. Any prolonged inability to retain key individuals, or to attract and retain new talent as we grow, could have a material adverse effect upon our growth potential and prospects. Additionally, we have not purchased any “key-man” insurance for our directors, officers or key employees.

***We are subject to certain agreements with government entities that have provided us with certain incentives and favorable financing and contain conditions and obligations, including local investment, job creation, and repayment terms, that, if not complied with, could negatively impact our business or require us to repay that financing or lose access to those incentives.***

We have been offered incentives by the State of Oklahoma, as well as the city of Stillwater, Oklahoma, to locate and operate our Projects, especially our Stillwater Facility. These incentives include cash grants, development financing at favorable terms, certain tax exemptions and rights to participate in government-subsidized jobs programs, among other things. If we do not comply with certain conditions and obligations in any such agreements, the governmental entities may terminate the respective agreement under which the incentives are to be provided, potentially resulting in the Company being required to repay certain funds and/or losing access to the applicable incentives and subsidized jobs programs. For more information on these agreements with government entities, see the section entitled “*Information About USARE — Government Programs and Grants”.*

***The holders of our preferred stock have certain approval rights over actions taken by the Company, including related to incurring debt. If we are unable to secure those approvals or do so in a timely manner, we may fail to access debt capital when otherwise necessary or advisable.***

The holders of our preferred stock have certain approval rights over actions taken by the Company, including: liquidation, dissolution or wind-up of the Company, amendment of the Company’s organizational documents, creation or issuance of the Company’s equity interests, the purchase or redemption of our preferred stock, entrance into affiliate transaction (subject to certain exceptions) or the incurrence of debt by the Company above certain specified thresholds. The approval rights remain in effect as long as certain parties specified in the Series A Preferred Stock Certificate of Designation (as defined below) own 20% or more of our Series A Preferred Stock and require the approval of a majority holders of our preferred stock. Our obligations to the holders of our preferred stock could limit our ability to obtain additional financing or increase our borrowing costs, which could have an adverse effect on the value of our equity. If we issue additional shares of preferred stock in the future, they would likely also have preference over our common stock with respect to payment of dividends or upon our liquidation, dissolution or winding up. So long as we have preferred stock outstanding, the rights of the holders of our common stock could be adversely affected, including as a result of any delay in receiving any necessary approvals from the holders of our preferred stock or as a result of our preferred stock making it more difficult for another company to acquire us.

***Our business may be adversely affected by force majeure events outside our control, including labor unrest, civil disorder, war, subversive activities or sabotage, extreme weather conditions, fires, floods, tornados, explosions or other catastrophes, epidemics or quarantine restrictions.***

We may be impacted by natural disasters, wars, health epidemics or pandemics or other events outside of our control. For example, our Stillwater Facility is located in Stillwater, Oklahoma, which is in the geographical area known as “tornado alley”. If major disasters such as tornados, earthquakes, wildfires, health epidemics or pandemics, floods or other events occur, or our information system or communications network breaks down or operates improperly, our ability to continue operations at our Projects may be seriously damaged, or we may have to stop or delay production and shipment of our products. We may incur expenses or delays relating to such events outside of our control, which could have a material adverse impact on our business, operating results and financial condition.

***Our success depends on developing and maintaining relationships with local communities and stakeholders.***

Our ongoing and future success depends on developing and maintaining productive relationships with the communities surrounding our Projects, including those people who may have rights or may assert rights to certain of our properties and other stakeholders in our operating locations. Local communities and stakeholders may be dissatisfied with our activities or the level of benefits provided, which may result in legal or administrative proceedings, civil unrest, protests, direct action or campaigns against us. Any such occurrence could materially and adversely affect our business, financial condition or results of operations, as well as our ability to commence or continue exploration or mine development activities.

***Since its inception, USARE OpCo has generated negative operating cash flows and we may experience negative cash flow from operations in the future. USARE OpCo’s consolidated financial statements have been prepared on a going concern basis.***

Since its inception, USARE OpCo has generated negative operating cash flows and we may experience negative cash flow from operations in the future. USARE OpCo’s consolidated financial statements, which were included in the Company’s Current Report on Form 8-K, which was filed with the SEC on March 19, 2025, have been prepared on a going concern basis, which contemplates the realization of assets and the discharge of liabilities in the normal course of business. USARE OpCo’s independent registered public accounting firm has included in its report for the year ended December 31, 2024 an explanatory paragraph expressing substantial doubt about our ability to continue as a going concern. New USARE’s and USARE OpCo’s ability to continue as a going concern is contingent upon, other factors, our ability to achieve our revenue forecasts and our ability to raise additional capital through sales of our securities, including this offering, and incurrence of debt, as needed to fund future growth. Our future operations are dependent upon the identification and successful completion of equity or debt financings and the continued achievement of profitable operations at an indeterminate time in the future. We may not be successful in completing equity or debt financings or in achieving profitability. The financial statements do not give effect to any adjustments relating to the carrying values and classifications of assets and liabilities that would be necessary should we be unable to continue as a going concern.

### Risks Related to Legal, Compliance, and Regulations

***Our operations at our Projects are subject, or may become subject, to extensive and costly environmental requirements; and current and future laws, regulations and permits impose or may impose significant costs, liabilities or obligations or could limit or prevent our ability to continue our current operations or to undertake new operations.***

We are subject, or may be subject in the future, to numerous and detailed, federal, state and local environmental laws, certifications, regulations and permits, including, without limitation, those pertaining to employee health and safety, air emissions, water usage, wastewater and stormwater discharges, air quality standards, GHG, emissions, water usage and pollution, waste management, plant and wildlife protection, handling and disposal of radioactive substances, remediation of soil and groundwater contamination, land use, reclamation and restoration of properties, the discharge of materials into the environment, procurement of certain materials used in our operations and groundwater quality and availability. These requirements may result in significant costs, liabilities and obligations, impose conditions that are difficult to achieve or otherwise delay, limit or prohibit current or planned operations. These requirements may in the future result in the exploration and development in connection with our Round Top Project being delayed, limited or prevented, and development operations may be curtailed. Failure to comply with these laws, regulations and permits, including as they evolve, may result in the assessment of administrative, civil and criminal penalties, the issuance of injunctions to limit or cease operations, fines, the suspension or revocation of permits and other sanctions or the loss of support from key stakeholders. Pursuant to such requirements, we may also be subject to third-party claims, including for damages to property or injury to persons arising from our operations. Moreover, environmental legislation and regulation, as well as the expectations of stakeholders, are evolving in a manner which may require stricter standards and enforcement, increased fines and penalties for non-compliance, cessation of operations, more stringent environmental assessments, and a heightened degree of responsibility for companies and their officers, directors and employees. Any changes in these laws, regulations or permits (or the interpretation or enforcement thereof) or any sanctions, damages, costs, obligations or liabilities in respect of these matters could have a material adverse effect on our business and/or the results of our operations and financial condition.

***We will be required to obtain and maintain governmental permits and approvals to develop and operate the Projects, a process which is often costly and time-consuming. Failure to obtain or retain any necessary permits or approvals for our planned operations may negatively impact our business.***

We are required to obtain and renew governmental permits and approvals for our Projects in connection with any exploration and development activities that we may in the future undertake and, prior to mining any mineralization that we discover, we may be required to obtain additional governmental permits and approvals that we do not currently possess or anticipate. Obtaining and renewing any of these governmental permits is a complex, time-consuming and uncertain process involving numerous jurisdictions, multiple government agencies, public hearings and possibly costly undertakings. The timeliness and success of permitting efforts are contingent upon many variables, some of which are not within our control, including the interpretation of approval requirements administered by the applicable governmental authority as well as the time required for, and the outcome of, any necessary environmental impact assessment.

We may not be able to obtain or renew permits or approvals that are necessary to our planned operations, or we may discover that the cost and time required to obtain or renew such permits and approvals exceeds our expectations. Any unexpected delays, costs or conditions associated with the governmental approval process could delay our planned exploration, development and mining operations, which in turn could materially adversely affect our prospects, revenues and profitability. In addition, our prospects may be adversely affected by the revocation or suspension of permits or by changes in the scope or conditions for use of any permits obtained.

For example, while many of the permits required for development of the Round Top Project come, or are expected to come, from the State of Texas, it is possible that the project will require a permit from the federal governments, such as a permit under Section 404 of the Clean Water Act. If the project requires a federal permit, the project will be subject to environmental review under the NEPA. In that circumstance, in addition to additional permitting review, NEPA also provides an additional avenue for opponents to challenge the project.

For example, in addition to the permits that we have been issued to date, we are required to obtain other permits and approvals before construction or operations related to zoning, rezoning, construction mining, mineral concentration and chemical manufacturing. To obtain certain permits, we may be required to conduct environmental studies and collect and present data to governmental authorities pertaining to the potential impact of our current and future operations upon the environment and to take steps to avoid or mitigate those impacts. The permitting rules, and interpretation thereof, are complex and have generally become more stringent over time. In some cases, the public (including environmental interest groups) has rights to comment upon, and submit objections to, permit applications and environmental impact statements prepared in connection therewith, and otherwise participate in the permitting process, including challenging the issuance of permits, validity of environmental impact statements and determinations and performance of permitted activities. Accordingly, permits required for our operations, including our Projects, may not be issued, maintained, exchanged, amended or renewed in a timely fashion or at all, or may be issued or renewed upon conditions that restrict our ability to conduct our operations economically. Any such failure to obtain, maintain, exchange, amend or renew permits, or other permitting delays or conditions, including in connection with any environmental impact analyses, could have a material adverse effect on our business, results of operations and financial condition.

Private parties, such as environmental organizations and local residents, frequently attempt to intervene in the permitting process to persuade regulators to deny necessary permits or seek to overturn permits that have been issued. These third-party actions can materially increase the costs of and cause delays in the permitting process and could cause us not to proceed with the development or operation of a property. In addition, our ability to successfully obtain key permits and approvals to explore for, develop, operate and expand operations will likely depend on our ability to undertake such activities in a manner consistent with the creation of social and economic benefits in the surrounding communities, which may or may not be required by law. Our ability to obtain permits and approvals and to successfully operate in particular communities may be adversely affected by real or perceived detrimental events associated with our activities.

***Our failure to comply with applicable anti-corruption, anti-bribery, anti-money laundering and similar laws and regulations could negatively impact our reputation and results of operations.***

The legal and regulatory framework in which we operate is complex, and our governance and compliance policies and processes may not prevent potential breaches of law or accounting or other governance practices. Our operating and ethical codes, among other standards and guidance, may not prevent instances of fraudulent behavior and dishonesty, nor guarantee compliance with legal and regulatory requirements.

We are required to comply with anti-corruption laws and regulations imposed by governments around the world with jurisdiction over our operations, which may include Australian anti-bribery and corruption legislation, as well as the laws of the other countries (for example, the U.S. Foreign Corrupt Practices Act and the UK’s Bribery Act 2010) where we do business or have a close connection. These laws and regulations may restrict our operations, trade practices, investment decisions and partnering activities. These and other applicable laws prohibit us and our officers, directors, employees and business partners acting on our behalf, including agents, from corruptly offering, promising, authorizing or providing anything of value to “foreign officials” for the purposes of influencing official decisions or obtaining or retaining business or otherwise obtaining favorable treatment. We are subject to the jurisdiction of various governments and regulatory agencies around the world, which may bring our personnel and representatives into contact with “foreign officials” responsible for issuing or renewing permits, licenses or approvals or for enforcing other governmental regulations.

Our failure to successfully comply with these laws and regulations may expose us to reputational harm, as well as significant sanctions, including criminal fines, imprisonment, civil penalties, disgorgement of profits, injunctions and debarment from government contracts, as well as other remedial measures. Investigations of alleged violations can be expensive and disruptive. Compliance, on the other hand, often adds cost and complexity to the permitting process and subsequent operations. We continuously develop and maintain policies and procedures designed to comply with applicable anti-corruption, anti-bribery, anti-money laundering and similar areas. However, there can be no guarantee that our policies and procedures will effectively prevent violations by our employees or business partners acting on our behalf, for which we may be held responsible, and any such violation could adversely affect our reputation, business, results of operations and financial condition.

***Our operations at our Projects are subject, or may become subject, to environmental, health and safety regulations, which could impose additional costs and compliance requirements, and we may face claims and liability for breaches, or alleged breaches, of such regulations and other applicable laws.***

Our operations at our Projects are subject to compliance with various environmental, health and safety laws, regulations, permitting requirements and standards.

We are subject to environmental laws, regulations and permits in the various jurisdictions in which we operate. These environmental laws, regulations, and permits present greater risks if we progress our mining operations. Such regulations would include those relating to, among other things, the removal and extraction of natural resources, the emission and discharge of materials into the environment, including plant and wildlife protection, remediation of soil and groundwater contamination, reclamation and closure of properties, including waste storage facilities, groundwater quality and availability, and the handling, storage, transport and disposal of wastes and hazardous materials. Pursuant to such requirements, we may be subject to inspections or reviews by governmental authorities. Failure to comply with these environmental requirements may expose us to litigation, fines or other sanctions, including the revocation of permits and suspension of operations. We expect to continue to incur significant capital and other compliance costs related to such requirements. These laws, regulations and permits, and the enforcement and interpretation thereof, change frequently and generally have become more stringent over time. If our noncompliance with such regulations were to result in a release of hazardous materials into the environment, such as soil or groundwater, we could be required to remediate such contamination, which could be costly. Moreover, noncompliance could subject us to private claims for property damage or personal injury based on exposure to hazardous materials or unsafe working conditions. In addition, changes in applicable requirements or stricter interpretation of existing requirements may result in costly compliance requirements or otherwise subject us to future liabilities. The occurrence of any of the foregoing, as well as any new environmental, health and safety laws and regulations applicable to our business or stricter interpretation or enforcement of existing laws and regulations, could have a material adverse effect on our business, financial condition and results of operations.

We also could be liable for any environmental contamination at, under or released from our or our predecessors’ currently or formerly owned or operated properties or third-party waste disposal sites. Certain environmental laws impose joint and several strict liability for releases of hazardous substances at such properties or sites, without regard to fault or the legality of the original conduct. A generator of waste can be held responsible for contamination resulting from the treatment or disposal of such waste at any off-site location (such as a landfill), regardless of whether the generator arranged for the treatment or disposal of the waste in compliance with applicable laws. Costs associated with liability for removal or remediation of contamination or damage to natural resources could be substantial and liability under these laws may attach without regard to whether the responsible party knew of, or was responsible for, the presence of the contaminants. Accordingly, we may be held responsible for more than our share of the contamination or other damages, up to and including the entire amount of such damages. In addition to potentially significant investigation and remediation costs, such matters can give rise to claims from governmental authorities and other third parties, including for orders, inspections, fines or penalties, natural resource damages, personal injury, property damage, toxic torts and other damages. Our costs, liabilities and obligations relating to environmental matters could have a material adverse effect on our business, financial position and results of operations.

Additionally, due to the nature of our operations, our employees and contractors are exposed to varying degrees of risk in the workplace. These risks may include exposure to dangerous situations, machinery or materials and/or health hazards and have the potential to result in disease, personal injury or death. We are subject to laws and regulations concerning the health, safety and security of our employees (including third-party personnel) working at sites and persons who are not employed by us but may be directly affected by our operations under our management and, accordingly, must implement adequate health and safety systems and procedures. Health and safety incidents can result in loss of life, losses and liabilities, work stoppages, serious damage to equipment or property or environmental damage. These risk factors can, singularly or in combination, have a material effect on our reputation, results of operations and financial condition. In the event of disease, injury or death arising out of the negligence of an employer or its employees, a risk of civil and, in certain circumstances, criminal litigation exists. In the case of a work-related fatality, an employer may be subjected to criminal charges in a court of law. Furthermore, such incidents can result in citations for violation of various health and safety laws and regulations that could have a material adverse effect on our results of operations, financial condition and/or prospects.

***The impacts of climate change may adversely affect our operations and/or result in increased costs to comply with changes in regulations.***

Climate change is an international and community concern which may directly or indirectly affect our business and current and future activities. The continuing rise in global average temperatures has created varying changes to regional climates across the world and extreme weather events have the potential to delay or hinder our exploration activities at our mineral projects, and to delay or cease operations at any future mine. This may require us to make additional expenditures to mitigate the impact of such events which may materially and adversely increase our costs and/or reduce production at a future mine. Governments at all levels are amending or enacting additional legislation to address climate change by regulating, among other things, carbon emissions and energy efficiency, or where legislation has already been enacted, regulation regarding emission levels and energy efficiency are becoming more stringent. As a significant emitter of GHG emissions, the mining industry is particularly exposed to such laws and regulations. Compliance with such legislation and regulations, including the associated costs, may have a material adverse effect on our business, financial condition, results of operations, prospects and our ability to commence or continue our exploration and future development and mining operations.

Changing climate patterns may also affect the availability of water. If the effects of climate change cause prolonged disruption in the delivery of essential commodities, then production efficiency may be reduced, which may have a material adverse effect on our business, financial condition, results of operations and prospects.

In addition, climate change is perceived as a threat to communities and governments globally and stakeholders may demand reductions in emissions or call upon companies to better manage their consumption of climate-relevant resources. A number of governments have already introduced or are moving to introduce climate change legislation and treaties at the international, national, state/provincial and local levels. Regulations relating to emission levels (such as carbon taxes) and energy efficiency are becoming more stringent. If the current regulatory trend continues, this may result in increased costs at our Round Top Project.

***We are exposed to possible litigation risks, including permit disputes (including in respect of access and/or validity of tenure), environmental claims, occupational health and safety claims and employee claims. Further, we may be involved in disputes with other parties in the future that may result in litigation. Current or future litigation or administrative proceedings could have a negative impact on our business.***

We may become involved in, named as a party to, or be the subject of, various legal proceedings, including regulatory proceedings, tax proceedings and legal actions, relating to personal injuries, property damage, property taxes, land rights, the environment and contract disputes.

The outcome of outstanding, pending or future proceedings cannot be predicted with certainty and may be determined adversely to us and as a result, could have a material adverse effect on our assets, liabilities, business, financial condition or results of operations. Even if we prevail in any such legal proceeding, the proceedings could be costly, time-consuming and may divert the attention of management and key personnel from our business operations, which could adversely affect our financial condition.

***If we take federal monies, we could become subject to federal regulations. This could delay timing and increase costs.***

To date, we have not accepted any federal grants or other monies. The acceptance of federal monies would make the Company and its operations subject to continued compliance with various federal regulations to which the Company is not currently subject. The imposition of any additional federal regulations as a result of accepting any federal monies could delay timing of the expected completion of our Projects and increase our costs. Any such delays or increased costs could harm our business and operations.

### Risks Related to Intellectual Property and Technology

***If we infringe, or are accused of infringing, the intellectual property rights of third parties, it may increase our costs or prevent us from being able to commercialize new products.***

There is a risk that we may infringe, or may be accused of infringing, the proprietary rights of third parties under patents and pending patent applications belonging to third parties that may exist in the United States and elsewhere in the world that relate to our rare earth products and processes. Because the patent application process can take several years to complete, there may be currently pending applications that may later result in issued patents that cover our products and processes. In addition, our products and processes may infringe existing patents.

Defending ourselves against third-party claims, including litigation in particular, would be costly and time consuming and would divert management’s attention from our business, which could lead to delays in the completion of our Projects and our downstream expansion plans. If third parties are successful in their claims, we might have to pay substantial damages or take other actions that are adverse to our business. As a result of intellectual property infringement claims, or to avoid potential claims, we might:

- be prohibited from, or delayed in, selling or licensing some of our products or using some of our processes unless the patent holder licenses the patent to us, which it is not required to do;
- be required to pay substantial royalties or grant a cross license to our patents to another patent holder; or
- be required to redesign a product or process so it does not infringe a third party’s patent, which may not be possible or could require substantial funds and time.

In addition, we could be subject to claims that our employees, or we, have inadvertently or otherwise used or disclosed trade secrets or other proprietary information of third parties.

If we are unable to resolve claims that may be brought against us by third parties related to their intellectual property rights on terms acceptable to us, we may be precluded from offering some of our products or using some of our processes.

***We may not be able to adequately protect our intellectual property rights. If we fail to adequately enforce or defend our intellectual property rights, our business may be harmed.***

Much of the technology used in the markets in which we compete is protected by patents and trade secrets, and our commercial success will depend in significant part on our ability to obtain and maintain patent and trade secret protection for our products and methods. To compete in these markets, we rely or may rely on a combination of trade secret protection, nondisclosure and licensing agreements, patents and trademarks to establish and protect our proprietary intellectual property rights, including our proprietary rare earth oxide and magnet production processes that are not currently patented. Our intellectual property rights may be challenged or infringed upon by third parties or we may be unable to maintain, renew or enter into new license agreements with third-party owners of intellectual property on reasonable terms. In addition, our intellectual property may be subject to infringement or other unauthorized use outside of the United States. In such case, our ability to protect our intellectual property rights by legal recourse or otherwise may be limited, particularly in countries where laws or enforcement practices are undeveloped or do not recognize or protect intellectual property rights to the same extent as the United States. Unauthorized use of our intellectual property rights or our inability to preserve existing intellectual property rights could adversely impact our competitive position and results of operations. The loss of our patents, if and once received, could reduce the value of the related products. In addition, the cost to litigate infringements of our patents (if and once received) or other intellectual property, or the cost to defend ourselves against patent or other intellectual policy infringement actions by others, could be substantial and, if incurred, could materially affect our business and financial condition.

Proprietary trade secrets and unpatented know-how are also very important to our business. We rely on trade secrets to protect certain aspects of our technology, especially where we do not believe that patent protection is appropriate or obtainable. However, trade secrets are difficult to protect. Our employees, consultants, contractors, outside scientific collaborators and other advisors may unintentionally or willfully disclose our confidential information to competitors, and confidentiality agreements may not provide an adequate remedy in the event of unauthorized disclosure of confidential or proprietary information. Enforcing a claim that a third party illegally obtained and is using our trade secrets is expensive and time consuming, and the outcome is unpredictable. Moreover, our competitors may independently develop equivalent knowledge, methods and know-how. Failure to obtain or maintain trade secret protection could adversely affect our competitive business position.

***We are dependent upon information technology systems, which are subject to cyber threats, disruption, damage and failure. Any unauthorized access to, disclosure, or theft of personal information we gather, store, or use could harm our reputation and subject us to claims or litigation. Further, a failure of our information technology and data security infrastructure could adversely affect our business and operations.***

We maintain information necessary to conduct our businesses, including confidential and proprietary information as well as personal information regarding our customers and employees, in digital form. We also use computer systems to deliver our products and services and operate our businesses. Data maintained in digital form is subject to the risk of unauthorized access, modification, exfiltration, destruction or denial of access and our computer systems are subject to cyberattacks that may result in disruptions in service. We use many third-party systems and software, which are also subject to supply chain and other cyberattacks. We attempt to develop and maintain information security programs to identify and mitigate cyber risks but the development and maintenance of these programs is costly and requires ongoing monitoring and updating as technology changes and efforts to overcome security measures become more sophisticated. Accordingly, despite our efforts, the risk of unauthorized access, modification, exfiltration, destruction or denial of access with respect to data or systems and other cybersecurity attacks cannot be eliminated entirely, and the risks associated with a potentially material incident remain. In addition, we provide some confidential, proprietary and personal information to third parties in certain cases when it is necessary to pursue business objectives. While we obtain assurances that these third parties will protect this information and, where we believe appropriate, monitor the protections employed by these third parties, there is a risk the confidentiality of data held by third parties may be compromised.

If our information or cyber security systems or data are compromised in a material way, our ability to conduct our businesses may be impaired, we may lose profitable opportunities or the value of those opportunities may be diminished and, as described above, we may lose revenue as a result of unlicensed use of our intellectual property. If personal information of our customers or employees is misappropriated, our reputation with our customers and employees may be damaged, resulting in loss of business or morale, and we may incur costs to remediate possible harm to our customers and employees or damages arising from litigation and/or to pay fines or take other action with respect to judicial or regulatory actions arising out of the incident. Insurance we obtain may not cover losses or damages associated with such attacks or events.

We rely on various information technology systems. These systems remain vulnerable to disruption, damage or failure from a variety of sources, including, but not limited to, errors by employees or contractors, computer viruses, cyberattacks, including phishing, ransomware, and similar malware, misappropriation of data by outside parties, and various other threats. Techniques used to obtain unauthorized access to or sabotage our systems are under continuous and rapid evolution, and we may be unable to detect efforts to disrupt our data and systems in advance. Breaches and unauthorized access carry the potential to cause losses of assets or production, operational delays, equipment failure that could cause other risks to be realized, inaccurate recordkeeping, or disclosure of confidential information, any of which could result in financial losses and regulatory or legal exposure, and could have a material adverse effect on our business, financial condition or results of operations. We may incur material losses relating to cyberattacks or other information security breaches in the future. Our risk and exposure to these matters cannot be fully mitigated because of, among other things, the evolving nature of these threats. As such threats continue to evolve, we may be required to expend additional resources to modify or enhance any protective measures or to investigate and remediate any security vulnerabilities.

### Risks Related to our Securities.

***The Certificate of Designation for our Series A Cumulative Convertible Preferred Stock and the Series A Preferred Investor Warrants each contain “full ratchet” anti-dilution provisions and a VWAP adjustment provision applicable to the conversion price and exercise price, respectively, which may result in a greater number of shares of Common Stock being issued upon conversions or exercises than if the conversions or exercises were effected at the conversion price or exercise price in effect currently.***

The Certificate of Designations of Preferences, Rights and Limitations of 12% Series A Cumulative Convertible Preferred Stock (the “Series A Preferred Stock Certificate of Designation”) for our Series A Cumulative Convertible Preferred Stock (the “Series A Preferred Stock”) contains “full ratchet” anti-dilution provisions applicable to the conversion prices used in voluntary conversions of Series A Preferred Stock by the holders thereof which provisions require the lowering of the applicable conversion price, as then in effect, to the purchase price of equity or equity-linked securities issued in subsequent offerings at prices less than $10.00 per share. In addition, if the 20-day volume-weighted average price of the Common Stock on the twenty-first trading day following the date that is six months after Closing Date is less than the conversion price then in effect, the conversion price will be adjusted to the greater of (i) such volume weighted average price and (ii) $7.50 (the “VWAP Adjustment”). The exercise price of the Series A Preferred Investor Warrants are initially exercisable at $12.00 per share of Common Stock, subject to the same anti-dilution and other adjustments as the Series A Preferred Stock. If the exercise price of the Series A Preferred Investor Warrants is reduced, the number of shares of Common Stock that may be purchased upon exercise of such Series A Preferred Investor Warrants will be increased proportionately, so that after such adjustment, the aggregate exercise price payable thereunder for the adjusted number of shares of Common Stock shall be the same as the aggregate exercise price in effect immediately prior to such adjustment.

If in the future, while any of our Series A Preferred Stock or Series A Preferred Investor Warrants are outstanding, we issue securities at an effective Common Stock purchase price below $10.00 that is less than the applicable conversion price of our Series A Preferred Stock or exercise price of our Series A Preferred Investor Warrants, as then in effect, we will be required, subject to certain limitations and adjustments as provided in the Series A Preferred Stock Certificate of Designation and the Series A Preferred Investor Warrants, to further reduce the relevant conversion price, which will result in a greater number of shares of Common Stock being issuable upon conversion or exercise of the Series A Preferred Stock or Series A Preferred Investor Warrants, as applicable, which in turn will have a greater dilutive effect on our stockholders. Similarly, if the VWAP Adjustment is triggered, we will be required to reduce the relevant conversion price, which will result in a greater number of shares of Common Stock being issuable upon conversion or exercise of the Series A Preferred Stock or Series A Preferred Investor Warrants, as applicable, which in turn will have a greater dilutive effect on our stockholders. Further, because the Series A Preferred Stock votes, together with the Common Stock, on an as-converted basis, a reduction in the conversion price will immediately dilute the voting interest of our Common Stock, even if the Series A Preferred Stock is not converted. The potential for such additional issuances may depress the price of our Common Stock regardless of our business performance. We may find it more difficult to raise additional equity capital while any of our Series A Preferred Stock or Series A Preferred Investor Warrants are outstanding.

Further, it is possible that we will not have a sufficient number of available shares to satisfy the conversion of the Series A Preferred Stock and exercise of the Series A Preferred Investor Warrants if the applicable conversion price or exercise price is reduced. If we do not have a sufficient number of available shares for such conversions or exercises, we will be required to increase our authorized shares, which may not be possible and will be time consuming and expensive.

***Delaware law and our certificate of incorporation and bylaws contain certain provisions, including anti-takeover provisions, that limit the ability of stockholders to take certain actions and could delay or discourage takeover attempts that stockholders may consider favorable.***

The provisions of our certificate of incorporation, our bylwas and the DGCL summarized below may have an anti-takeover effect and may delay, defer or prevent a tender offer or takeover attempt that you might consider in your best interest, including an attempt that might result in your receipt of a premium over the market price for your shares of Common Stock.

Our certificate of incorporation and bylaws contain certain provisions that are intended to enhance the likelihood of continuity and stability in the composition of our board of directors and that may have the effect of delaying, deferring or preventing a future takeover or change in control of us unless such takeover or change in control is approved by our board of directors.

These provisions include:

- *Authorized but Unissued Capital Stock*. The authorized but unissued shares of our preferred stock will be available for future issuance without stockholder approval. These additional shares may be utilized for a variety of corporate purposes, including future public offerings to raise additional capital, corporate acquisitions and employee benefit plans. The existence of authorized but unissued shares of our preferred stock could render more difficult or discourage an attempt to obtain control of a majority of Common Stock by means of a proxy contest, tender offer, merger or otherwise.
- *No Cumulative Voting for Directors*. The DGCL provides that stockholders are not entitled to cumulate votes in the election of directors unless a corporation’s certificate of incorporation provides otherwise. Our certificate of incorporation does not provide for cumulative voting. As a result, the holders of our Common Stock representing a majority of the voting power of all of the outstanding shares of our capital stock of will be able to elect all of the directors then standing for election.
- *Quorum*. Our bylaws provide that at all meetings of our board of directors, a majority of the Whole Board (as defined therein) will constitute a quorum for the transaction of business.
- *Action by Written Consent*. Any action required or permitted to be taken by our stockholders must be effected at a duly called annual or special meeting of such holders and may not be effected by any consent in lieu of a meeting of stockholders by such holders; provided, however, that any action required or permitted to be taken by the holders of our preferred stock, voting separately as a series or separately as a class with one or more other such series, may be taken without a meeting, without prior notice and without a vote, to the extent expressly so provided by the applicable certificate(s) of designation relating to such series of preferred stock.
- *Special Meetings of Stockholders*. Our certificate of incorporation provides that, except as otherwise required by law and subject to the rights of the holders of any series of our preferred stock, special meetings of stockholders of for any purpose or purposes may be called at any time only by or at the direction of the Chair of our board of directors or by a resolution adopted by the affirmative vote of a majority of the total number of directors that we would have if there were no vacancies on the our board of directors, but such special meetings may not be called by stockholders or any other person or persons.
- *Advance Notice Procedures*. Our bylaws establish an advance notice procedure for stockholder proposals to be brought before an annual meeting of the stockholders, and for stockholder nominations of persons for election to our board of directors to be brought before an annual or special meeting of stockholders. Stockholders at an annual meeting will only be able to consider proposals or nominations specified in the notice of meeting or brought before the meeting by or at the direction of our board of directors or by a stockholder who was a stockholder of record on the record date for the meeting, who is entitled to vote at the meeting and who has given our secretary timely written notice, in proper form, of the stockholder’s intention to bring that business or nomination before the meeting. Although our bylaws do not give the board of directors the power to approve or disapprove stockholder nominations of candidates or proposals regarding other business to be conducted at a special or annual meeting, as applicable, our bylaws may have the effect of precluding the conduct of certain business at a meeting if the proper procedures are not followed or may discourage or deter a potential acquirer from conducting a solicitation of proxies to elect its own slate of directors or otherwise attempting to obtain control of the company.

***The requirements of being a public company in the U.S. may strain our resources and divert management’s attention, and the increases in legal, accounting and compliance expenses that result from being a public company in the U.S. may be greater than we anticipate.***

Requirements associated with being a public company in the United States requires significant resources and management attention. We are subject to certain reporting requirements of the Exchange Act, and the other rules and regulations of the SEC, and Nasdaq. We are also subject to various other regulatory requirements, including the Sarbanes-Oxley Act. We expect these rules and regulations to increase our legal, accounting and financial compliance costs and to make some activities more time-consuming and costly. For example, these rules and regulations have made it, and may continue to make it, more difficult and more expensive for us to obtain directors’ and officers’ liability insurance, which could make it more difficult for us to attract and retain qualified members of our board of directors. In addition, as a public company we are required to provide a report from management on our internal control over financial reporting that includes an assessment of the effectiveness of these controls. Internal control over financial reporting has inherent limitations, including human error, the possibility that controls could be circumvented or become inadequate because of changed conditions and fraud. Because of these inherent limitations, internal control over financial reporting might not prevent or detect all misstatements. If we cannot provide reliable financial reports or prevent fraud and errors in our financial statements, our reputation and operating results could be materially adversely affected. We cannot predict or estimate the amount of additional costs we will incur as a public company or the timing of such costs. In addition, complying with rules and regulations and the increasingly complex laws pertaining to public companies requires substantial attention from our senior management, which could divert their attention away from the day-to-day management of our business. These cost increases and the diversion of management’s attention could materially and adversely affect our business, results of operations and financial condition. We are also hiring additional personnel to support our financial reporting function and may face challenges in doing so.

***If the benefits of the Business Combination do not meet the expectations of investors or securities analysts, the market price of our securities may decline.***

If the benefits of the Business Combination do not meet the expectations of investors or securities analysts, the market price of our securities may decline. The market values of these securities at the time of the Business Combination could have varied significantly from their prices on the date the Business Combination Agreement was executed, the date of this Annual Report, or the date on which Inflection Point’s shareholders voted on the Business Combination. Because the number of shares issued pursuant to the Business Combination Agreement were based on the per share value of the amount in Inflection Point’s trust account and was not adjusted to reflect any changes in the market price of Inflection Point’s Class A ordinary shares, the market value of shares of our and securities converted or exercised for shares of our Common Stock issued in the Business Combination could have been higher or lower than the values of these securities on earlier dates.

In addition, following the Business Combination, our shares of Common Stock do not have any redemption rights like Inflection Point’s public shares had and fluctuations in the price of shares of our Common Stock could contribute to the loss of all or part of your investment. The trading price of shares of our Common Stock following the Business Combination could be volatile and subject to wide fluctuations in response to various factors, some of which are beyond our control. Inflationary pressures, increases in interest rates and other adverse economic and market forces may contribute to potential downward pressures in market value of shares of Common Stock. Additionally, any of the risk factors discussed in this Annual Report could have a material adverse effect on your investment and shares of Common Stock may trade at prices significantly below the price you paid for them. In such circumstances, the trading price of shares of Common Stock may not recover and may experience a further decline.

Broad market and industry factors may materially harm the market price of shares of Common Stock irrespective of our operating performance. The stock market in general, and Nasdaq specifically, has experienced extreme volatility that has often been unrelated to the operating performance of particular companies. As a result of this volatility, you may not be able to sell your securities at or above the price at which they were acquired. A loss of investor confidence in the market for the stocks of other companies which investors perceive to be similar to us could depress our share price regardless of our business, prospects, financial conditions or results of operations. A decline in the market price of our securities also could adversely affect our ability to issue additional securities and our ability to obtain additional financing in the future.

***There is no guarantee that the New USARE Warrants will ever be in the money, and they may expire worthless.***

The exercise price for the New USARE Warrants is $11.50 per share of Common Stock, subject to adjustment. There is no guarantee that the New USARE Warrants will ever be in the money prior to their expiration, and as such, the New USARE Warrants may expire worthless.

***Your unexpired New USARE Warrants may be redeemed prior to their exercise at a time that is disadvantageous to you, thereby making your Warrants worthless.***

Outstanding New USARE Warrants may be redeemed at any time after they become exercisable and prior to their expiration, at a price of $0.01 per New USARE Warrant, provided that the last reported sales price of the Common Stock equals or exceeds $18.00 per share (as adjusted for stock splits, stock capitalizations, reorganizations, recapitalizations and the like) for any 20 trading days within a 30 trading-day period commencing at least 150 days after completion of the Business Combination ending on the third trading day prior to the date we send the notice of redemption to the New USARE Warrant holders. If and when the warrants become redeemable by us, we may not exercise our redemption rights if the issuance of share of Common Stock upon exercise of the New USARE Warrants is not exempt from registration or qualification under applicable state blue sky laws or we are is unable to effect such registration or qualification, subject to New USARE’s obligation in such case to use its best efforts to register or qualify the shares of Common Stock under the blue sky laws of the state of residence in those states in which the warrants were initially offered by Inflection Point in its IPO. Redemption of the outstanding New USARE Warrants could force you (a) to exercise your New USARE Warrants and pay the exercise price at a time when it may be disadvantageous for you to do so, (b) to sell your New USARE Warrants at the then-current market price when you might otherwise wish to hold your New USARE Warrants or (c) to accept the nominal redemption price which, at the time the outstanding New USARE Warrants are called for redemption, is likely to be substantially less than the market value of your New USARE Warrants.

***The New USARE Warrants and the Series A Preferred Investor Warrants may have an adverse effect on the market price of the Common Stock.***

There are an aggregate of 18,500,000 New USARE Warrants outstanding, each exercisable for $11.50 per share of Common Stock. The Company has issued Series A Preferred Investor Warrants exercisable for an aggregate of 5,279,413 shares of Common Stock, subject to adjustment, at an initial exercise price of $12.00, subject to adjustment. Such New USARE Warrants and the Series A Preferred Investor Warrants, if and when exercised, will increase the number of issued and outstanding shares and may reduce the market price of the Common Stock.

***You may only be able to exercise your New USARE Warrants on a “cashless basis” under certain circumstances, and if you do so, you will receive fewer shares of Common Stock from such exercise than if you were to exercise such New USARE Warrants for cash.***

The warrant agreement governing the New USARE Warrants, dated as of May 24, 2023 (the “Warrant Agreement”), by and between the Company and Continental Stock Transfer & Trust Company, as warrant agent, provides that in the following circumstances holders of public New USARE Warrants who seek to exercise their New USARE Warrants will not be permitted to do for cash and will, instead, be required to do so on a cashless basis in accordance with Section 3(a)(9) of the Securities Act: (i) if the shares of Common Stock issuable upon exercise of the New USARE Warrants are not registered under the Securities Act in accordance with the terms of the Warrant Agreement; (ii) if we have so elected and the shares of Common Stock are at the time of any exercise of a public New USARE Warrant not listed on a national securities exchange such that they satisfy the definition of “covered securities” under Section 18(b)(1) of the Securities Act; and (iii) if we have so elected and we call the public New USARE Warrants for redemption.

If you exercise your New USARE Warrants on a cashless basis, you would pay the warrant exercise price by surrendering the New USARE Warrants for that number of shares of Common Stock equal to the quotient obtained by dividing (x) the product of the number of shares of Common Stock underlying the New USARE Warrants, multiplied by the excess of the “fair market value” of shares of Common Stock (as defined in the next sentence) over the exercise price of the New USARE Warrants by (y) the fair market value. The “fair market value” is the average reported closing price of the shares of Common Stock for the 10 trading days ending on the third trading day prior to the date on which the notice of exercise is received by the warrant agent or on which the notice of redemption is sent to the holders of New USARE Warrants, as applicable. As a result, you would receive fewer shares of Common Stock from such exercise than if you were to exercise such New USARE Warrants for cash.

***A significant portion of our total outstanding Common Stock is restricted from immediate resale but may be sold into the market in the near future. This could cause the market price of our Common Stock to drop significantly, even if our business is doing well.***

Sales of a substantial number of shares of our Common Stock in the public market could occur at any time. These sales, or the perception in the market that the holders of a large number of shares intend to sell shares, could reduce the market price of our common stock.

We are party to a registration rights agreement with Inflection Point Holdings II LLC, the holders of Series A Preferred Stock and Series A Preferred Investor Warrants, and certain other holders of our securities.

Although former members of USARE OpCo that received more than 2% of our Common Stock in the Business Combination and the Sponsor are prohibited from transferring any of the Common Stock they held as of the Closing Date (subject to customary exceptions) until six months after the Closing Date, and are further prohibited from selling more than 50% of such holdings until one year after the Closing Date, these shares may be sold under a registration statement or pursuant to an exemption from registration after the expiration or early termination or release of the respective applicable lock-ups. The holders of Series A Preferred Stock and Series A Preferred Investor Warrants are not, in their capacities as such, subject to any contractual lock-up restrictions. As restrictions on resale end and the registration statement is available for use, the market price of Common Stock could decline if the holders of currently restricted shares sell them or are perceived by the market as intending to sell them.

***Our certificate of incorporation provides, subject to limited exceptions, that the courts of the State of Delaware are the sole and exclusive forum for certain stockholder litigation matters, which could limit our stockholders’ ability to obtain a favorable judicial forum for disputes with us or our directors, officers, employees or stockholders.***

Our certificate of incorporation requires, to the fullest extent permitted by law, that derivative actions brought in our name, actions against directors, officers and employees for breach of fiduciary duty and other similar actions be brought in the Court of Chancery of the State of Delaware or, if that court does not have jurisdiction, a state court located within the State of Delaware or the federal district court for the District of Delaware. Any person or entity purchasing or otherwise acquiring any interest in shares of our capital stock shall be deemed to have notice of and consented to the forum provisions in our certificate of incorporation. In addition, our certificate of incorporation provides that this choice of forum does not apply to any complaint asserting a cause of action under the Securities Act and the Exchange Act. Finally, our certificate of incorporation provides that federal district courts of the United States are the exclusive forum for the resolution of any complaint asserting a cause of action under the Securities Act or the Exchange Act.

While the Delaware Supreme Court has upheld provisions of the certificates of incorporation of other Delaware corporations that are similar to the exclusive forum provision in our certificate of incorporation, a court of a state other than the State of Delaware could decide that such provisions are not enforceable under the laws of that state.

The choice of forum provision may limit a stockholder’s ability to bring a claim in a judicial forum that it finds favorable for disputes with us or any of our directors, officers, other employees or stockholders, which may discourage lawsuits with respect to such claims. Alternatively, if a court were to find the choice of forum provision contained in our certificate of incorporation to be inapplicable or unenforceable in an action, we may incur additional costs associated with resolving such action in other jurisdictions, which could harm our business, operating results and financial condition.

***We may be subject to securities litigation, which is expensive and could divert management’s attention.***

The share price of our Common Stock may be volatile and, in the past, companies that have experienced volatility in the market price of their stock have been subject to securities class action litigation. We may be the target of this type of litigation in the future. Litigation of this type could result in substantial costs and diversion of management’s attention and resources, which could have a material adverse effect on its business, financial condition, results of operations and prospects. Any adverse determination in litigation could also subject us to significant liabilities.

***As an “emerging growth company,” we cannot be certain if the reduced disclosure requirements applicable to “emerging growth companies” will make our Common Stock less attractive to investors.***

As an “emerging growth company,” we may take advantage of certain exemptions from various reporting requirements that are applicable to other public companies, including not being required to obtain an assessment of the effectiveness of our internal controls over financial reporting from our independent registered public accounting firm pursuant to Section 404 of the Sarbanes-Oxley Act, reduced disclosure obligations regarding executive compensation in our periodic reports and proxy statements, and exemptions from the requirements of holding a nonbinding advisory vote on executive compensation and stockholder approval of any golden parachute payments not previously approved. In addition, the JOBS Act provides that an emerging growth company can take advantage of an extended transition period for complying with new or revised accounting standards, which we have elected to do.

We cannot predict if investors will find our Common Stock less attractive because we rely on these exemptions. If some investors find our Common Stock less attractive as a result, there may be a less active market for our Common Stock, our share price may be more volatile and the price at which our securities trade could be less than if we did not use these exemptions.

## Cybersecurity

As filed, 4,056 characters.

### Risk management and strategy

We rely on our technology network infrastructure and information systems to operate our business, interact with vendors and customers, and collect and make payments, among other functions. Our internally developed infrastructure and systems, as well as those systems and processes provided by third-party vendors, may be susceptible to damage or interruption from cybersecurity threats and incidents, which include any unauthorized access to our information systems that may result in adverse effects on the confidentiality, integrity or availability of such systems or related information.

Such attacks have become more sophisticated over time, especially as threat actors have become increasingly well-funded by or themselves include governmental actors with significant means. We expect that the sophistication of cyber-threats will continue to evolve as threat actors increase their use of AI and machine-learning technologies. The Company experiences cyber threats in the normal course of its business, and computer viruses, hackers, employee misconduct and other external hazards could expose our information systems to security breaches, cybersecurity incidents or other disruptions, any of which could materially and adversely affect our business. Refer to Item 1A. Risk Factors, for additional details on cybersecurity risks that could potentially materially affect the Company.

We manage our risks from cybersecurity threats through our overall enterprise risk management process, which is overseen by the Board. Our cybersecurity risks are considered individually as part of our enterprise risk management process alongside other risks, and priorities and discussed with our Board. The Company seeks to prioritize the management of cybersecurity risk and the protection of confidential information and systems. Under the supervision of the Chief Executive Officer (“CEO”) and VP of Business Operations and Strategy, we work to identify all computing assets including hardware, software, and network infrastructure in order to conduct a risk assessment. We consider threats that may originate from both internal and external sources and maintain technical security controls internally. We are putting in place plans for our employees to receive mandatory recurring cybersecurity training and phishing exercises.

The Company’s VP of Business Operations and Strategy reports directly to the CEO and leads the Information Technology team (collectively, the “IT Security Team”). The IT Security Team is responsible for the strategic oversight of cybersecurity risk management and strategy including the identification and assessment of cybersecurity threats and incidents. Periodically, the Company’s VP of Business Operations and Strategy is also responsible, alongside the Chief Financial Officer (“CFO”) and senior management, to keep the Audit Committee of the Board of Directors informed and briefed with respect to cybersecurity risks and risks. Our VP of Business Operations and Strategy has extensive experience of over 20 years in various IT roles across a range of cyber technologies, processes and strategies and is supported by the IT Security Team and the wider IT team, to support the Company’s cyber risk management processes, including the prevention, detection and mitigation of cybersecurity threats and incidents, and any required response to and remediation of such cybersecurity threats or incidents.

### Governance

The Audit Committee is responsible for providing governance and oversight over the Company’s operational cybersecurity program, risk management and incident response on behalf of the Board. On a periodic basis, management will report the results of any risk assessments, including the evaluation of any cybersecurity risks, and the actions that the Company has taken to mitigate these risks. This includes assessing the measures and controls in place to mitigate cybersecurity risks and providing oversight of the response of any significant cybersecurity threats and incidents.

## Properties

As filed, 229 characters.

For information regarding the properties of USARE, reference is made to the disclosure set forth above in Item 1. Business of this Annual Report under the heading “*USARE’s Facilities,”* which is incorporated herein by reference.

## Legal proceedings

As filed, 1,991 characters.

From time to time, we may become involved in legal proceedings or be subject to claims that arise in the ordinary course of our business, the outcomes of which are subject to uncertainty. Any claims against us, whether meritorious or not, can be time-consuming, result in costly litigation, require significant management time, create a negative perception of the company with communities, stakeholders, and government agencies and result in the diversion of significant operational resources.

A complaint was filed in Delaware Chancery Court by Ramco Asset Management, LLC (“Ramco”), US Trading Company Metals RE, LLC, and Dinsha Dynasty Trust (collectively, the “Plaintiffs”) on July 29, 2022 against USARE OpCo, Morzev Pty Ltd., Mordechai Gutnick ATF the Morzev Trust, Mordechai Gutnick, and Pini Althaus (collectively, the “Defendants”), captioned Ramco Asset Management, LLC v. USA Rare Earth, LLC, C.A. No. 2022-0665-SG (as amended, the “Complaint”). In connection with this matter and a disagreement regarding the number of units of USARE OpCo that were issued to the Plaintiffs in transactions during 2019, the Complaint alleged causes of action for breach of contract, breach of fiduciary duty, breach of the Corporations Act (Australia), fraud and misrepresentation, and breach of the duty of good faith and fair dealing. The Complaint seeks a variety of relief, including compensatory and punitive damages, curative equity, attorneys fees and expenses and other relief as may be granted by the court. USARE OpCo thereafter filed a motion to dismiss Plaintiffs’ claims. After motion practice and argument, the court dismissed all claims, except for Ramco’s alleged breach of contract claim and alleged breach of good faith and fair dealing as asserted against USARE OpCo. The remaining plaintiff has not quantified its alleged damages. Ramco and USARE OpCo are now engaged in discovery, with trial scheduled for November 2025. USARE OpCo intends to contest this matter vigorously.

## Management's discussion and analysis

As filed, 47,723 characters.

Unless otherwise noted or the context otherwise requires, *references to the “Company,” “Inflection Point,” “Inflection Point Acquisition Corp. II,” “our,” “us” or “we” refer to Inflection Point Acquisition Corp. II. The following discussion and analysis of the Company’s financial condition and results of operations should be read in conjunction with our audited financial statements and the notes related thereto which are included in “Item 8. Financial Statements and Supplementary Data” of this Annual Report. The term “USARE OpCo” refers to USA Rare Earth, LLC, and the term “New USARE” refers to USA Rare Earth, Inc. after the consummation of the Business Combination.*

The financial information included in this Item 7 is that of Inflection Point prior to the Business Combination because the Business Combination was consummated subsequent to the period covered by the audited financial statements included in this Annual Report.

### Overview

Until March 13, 2025, we were a special purpose acquisition company incorporated in the Cayman Islands on March 6, 2023, formed for the purpose of effecting a merger, share exchange, asset acquisition, share purchase, reorganization or other similar business combination with one or more businesses. Our intent was to effectuate a business combination, including the Business Combination, using cash derived from the proceeds of the IPO and the sale of the private placement warrants, our shares, debt or a combination of cash, our shares and debt.

We incurred significant costs in the pursuit of our acquisition plans.

### Results of Operations

We have neither engaged in any operations nor generated any revenues through December 31, 2024. Our only activities from March 6, 2023 (inception) through December 31, 2024 were organizational activities, those necessary to prepare for our IPO, described below, and subsequent to the IPO, identifying a target company for a business combination and activities in connection with the Business Combination. We did not generate any operating revenues from March 6, 2023 (inception) through December 31, 2024. We generated non-operating income in the form of interest income on cash and cash equivalents and dividend income on marketable securities held in the trust account established in connection with Inflection Point’s IPO (the “Trust Account”). We incur expenses as a result of being a public company (for legal, financial reporting, accounting and auditing compliance), as well as for due diligence expenses.

For the year ended December 31, 2024, we had net income of $7,899,035, which consists of dividend income earned on marketable securities held in the Trust Account of $12,019,932, change in fair value of Forward Purchase Agreement of $435,568 and interest income from bank of $5,755, partially offset by formation and operating costs of $4,077,377 and loss on issuance of Forward Purchase Agreements of $484,843.

For the period from March 6, 2023 (inception) through December 31, 2023, we had net income of $6,748,069, which consists of dividend income earned on marketable securities held in the Trust Account of $7,721,518 and interest income from bank of $11,763, partially offset by formation and operating costs of $985,212.

### Business Combination with USARE

On August 21, 2024 (the “Signing Date”), Inflection Point entered into that certain Business Combination Agreement by and among Inflection Point, USARE OpCo and Merger Sub (as amended on November 12, 2024 and January 30, 2025), pursuant to which, among other things and subject to the terms and conditions contained therein, Merger Sub merged with and into USARE OpCo with USARE continuing as the surviving company and a direct wholly owned subsidiary of Inflection Point. In connection with the Closing of the Business Combination, Inflection Point changed its name to “USA Rare Earth, Inc.”.

#### The Domestication

Inflection Point, after obtaining the required shareholder approvals, completed the Domestication, changing its jurisdiction of incorporation by deregistering as a Cayman Islands exempted company and continuing and domesticating as a corporation incorporated under the laws of the State of Delaware. Prior to, but on the same day as, the Domestication, Inflection Point provided its public shareholders the opportunity to redeem their public shares on the terms and conditions set forth in the Business Combination Agreement and Inflection Point’s governing documents (the “Redemption”). The Company redeemed 128,140 public shares in the Redemption.

By virtue of the Domestication and subject to the satisfaction or waiver of the conditions of the Business Combination Agreement, including approval of Inflection Point’s shareholders: (i) immediately prior to the Domestication, pursuant to the Sponsor Support Agreement (as defined below) each of the then issued and outstanding Class B ordinary shares of Inflection Point converted automatically, on a one-for-one basis, into one (1) Class A ordinary share, par value of $0.0001 per share, of Inflection Point (the “Sponsor Share Conversion”); and (ii) in connection with the Domestication, (x) each then issued and outstanding Class A ordinary share (that was not redeemed pursuant to the Redemption) converted automatically, on a one-for-one basis, into one (1) share of Common Stock; (y) each of the then issued and outstanding warrants representing the right to purchase one Class A ordinary share converted automatically into a New USARE Warrant to acquire one (1) share of Common Stock; and (z) each of the then issued and outstanding units of Inflection Point was cancelled and each holder thereof became entitled to one share of Common Stock and one-half (1/2) of one New USARE Warrant.

#### The Merger and Consideration

Subject to, and in accordance with the terms and conditions of the Business Combination Agreement, immediately prior to the effective time of the Merger (the “Effective Time”), (i) each warrant to purchase Class C convertible preferred units of USARE OpCo (the “USARE Class C Convertible Preferred Units”) or Class C-1 convertible preferred units of USARE OpCo (the “USARE Class C-1 Convertible Preferred Units”) was automatically exercised on a cashless basis in full in accordance with its terms and (ii) immediately thereafter, each then-issued and outstanding USARE Class C Convertible Preferred Unit and each then-issued and outstanding USARE Class C-1 Convertible Preferred Unit (including each USARE Class C Convertible Preferred Unit and USARE Class C-1 Convertible Preferred Unit issued upon the automatic exercise described in the preceding clause (i)) was automatically converted into such number of Class B units of USARE OpCo (the “USARE Class B Units”) into which such USARE Class C Convertible Preferred Unit or USARE Class C-1 Convertible Preferred Unit, as applicable, was convertible in connection with the Merger pursuant to USARE OpCo’s Sixth Amended and Restated Operating Agreement, as amended (the “Pre-Closing USARE OpCo OA”).

Subject to, and in accordance with the terms and conditions of the Business Combination Agreement, at the Effective Time:

(i) each unit of USARE OpCo that was owned by Inflection Point, Merger Sub or USARE OpCo (in treasury or otherwise) immediately prior to the Effective Time (each an “Excluded Unit”) was cancelled and ceased to exist and no consideration was delivered in exchange therefore;

(ii) each incentive unit (the “USARE Incentive Units”) that was issued and outstanding immediately prior to the Effective Time (other than Excluded Units), by virtue of the occurrence of the Merger, (x) to the extent the holder of such USARE Incentive Unit was continuously employed by or providing services to USARE OpCo from the Signing Date through the Effective Time, was automatically deemed to be fully vested, (y) regardless of such employment or service status, was automatically deemed exchanged or converted (on a cashless basis) into a fraction of one Class A unit of USARE OpCo (the “USARE Class A Units”) in accordance with the terms of such USARE Incentive Unit, the Pre-Closing USARE OpCo OA and the Second Amended and Restated USA Rare Earth, LLC Incentive Plan and each USARE Class A Unit issued or issuable upon such deemed exchange or conversion was treated as being issued and outstanding immediately prior to the Effective Time;

(iii) each warrant to purchase units of USARE OpCo (excluding the USARE Class A Preferred Investor Warrants (as defined below)) (the “USARE Warrants”) that was outstanding and unexercised immediately prior to the Effective Time was, by virtue of the occurrence of the Merger, automatically exercised or deemed exercised on a cashless basis in full in accordance with its terms immediately prior to the Effective Time, and each USARE Class A Unit or USARE Class B Unit issued or issuable upon such exercise was treated as being issued and outstanding immediately prior to the Effective Time;

(iv) each USARE Class A Unit that was issued and outstanding immediately prior to the Effective Time (including all USARE Class A Units outstanding or deemed outstanding (a) upon the deemed exchange or conversion of the USARE Incentive Units and (b) upon the deemed exercise of the USARE Warrants, but excluding the Excluded Units) was cancelled and converted into the right to receive a number of shares of Common Stock equal to the Exchange Ratio (as defined below) (the “Per Unit Base Consideration”) and the right to receive, subject to the vesting conditions described below, a number of shares of Common Stock equal to the Earn-out Exchange Ratio (as defined below) (the “Per Unit Earn-out Consideration”);

(v) each USARE Class B Unit that was issued and outstanding immediately prior to the Effective Time (including all USARE Class B Units outstanding or deemed outstanding upon the deemed exercise of the USARE Warrants, but excluding the Excluded Units) was cancelled and converted into the right to receive the Per Unit Base Consideration and the Per Unit Earn-out Consideration;

(vi) each Class A-1 convertible preferred unit of USARE OpCo (the “USARE Class A-1 Convertible Preferred Units”) and each Class A-2 convertible preferred unit of USARE OpCo (the “USARE Class A-2 Convertible Preferred Units,” and together with the USARE Class A-1 Convertible Preferred Units, the “USARE Class A Convertible Preferred Units”) that was issued and outstanding immediately prior to the Effective Time (other than Excluded Units) was cancelled and converted into the right to receive one share of Series A Preferred Stock (as defined below); and

(vii) each warrant to purchase USARE Class A Units at an initial exercise price of $12.00 per USARE Class A Unit, subject to adjustment, and initially issued to a holder of USARE Class A Convertible Preferred Units (each such warrant, a “USARE Class A Preferred Investor Warrant”) was cancelled and converted into the right to receive a Series A Preferred Investor Warrant (as defined below) exercisable for a number of shares of Common Stock equal to the aggregate number of USARE Class A Units that would be issued upon full exercise of such USARE Class A Preferred Investor Warrant

Pursuant to the Business Combination Agreement, the aggregate consideration paid in, or in connection with, the Merger in respect of the outstanding equity securities of USARE OpCo (excluding the USARE Class A Convertible Preferred Units and the USARE Class A Preferred Investor Warrants) was 72,747,711 shares of Common Stock (the “Aggregate Base Consideration”). The Aggregate Base Consideration was calculated as (i) the number of shares of Common Stock equal to the quotient of (a) $800,000,000 divided by (b) the redemption price of $10.99687276. The “Exchange Ratio” was equal to 0.2043578. The Exchange Ratio was calculated as the Aggregate Base Consideration divided by the sum (without duplication) of the aggregate number of (i) USARE Class A Units that were issued and outstanding immediately prior to the Effective Time, (ii) USARE Class B Units that were issued and outstanding immediately prior to the Effective Time (including all USARE Class B Units issued upon conversion of all outstanding USARE Class C Convertible Preferred Units and USARE Class C-1 Convertible Preferred Units), (iii) all USARE Class A Units and USARE Class B Units issuable upon full exercise of all issued and outstanding USARE Warrants (calculated using the treasury method of accounting on a cashless exercise basis), and (iv) all USARE Class A Units and USARE Class B Units issuable upon full exercise, exchange or conversion of all issued and outstanding USARE Incentive Units (calculated using the treasury method of accounting on a cashless exercise basis) (such sum, the “USARE Fully Diluted Capital”). At the Effective Time, the USARE Fully Diluted Capital was 355,983,292 units, consisting of (i) 207,585,648 Class A common units, (ii) 20,778,672 Class B common units, (iii) 22,274,921 common units deemed issued upon full exercise, exchange or conversion of all issued and outstanding USARE Incentive Units (calculated using the treasury method of accounting on a cashless exercise basis), (iv) 96,049,828 Class B common units deemed issued upon conversion of all outstanding USARE Class C Convertible Preferred Units and USARE Class C-1 Convertible Preferred Units, (v) 7,440,828 Class B common units deemed issued upon full exercise of all issued and outstanding Class B common warrants (calculated using the treasury method of accounting on a cashless exercise basis), and (vi) 1,853,395 Class B common units deemed issued upon full exercise of all issued and outstanding Class C common warrants and Class C-1 common warrants (calculated using the treasury method of accounting on a cashless exercise basis).

The “Earn-out Exchange Ratio” was 0.028091206. The Earn-out Exchange Ratio was calculated as 10,000,000 shares of Common Stock (the “Aggregate Earn-out Consideration”) divided by the USARE Fully Diluted Capital. 50% of the Aggregate Earn-out Consideration will vest and be issued if, during the five year period beginning on the first anniversary of the Closing Date, the closing sale price of one share of Common Stock as reported on the national securities exchange on which such shares are then listed is greater than or equal to $15.00 for a period of at least twenty out of thirty consecutive days on which shares of Common Stock are actually traded on the principal securities exchange or securities market on which shares of Common Stock are then traded (each a “Trading Day”). The remaining 50% of the Aggregate Earn-out Consideration shall vest and be issued if, during the period beginning on the first anniversary of the Closing Date and ending on the sixth anniversary of the Closing Date, the closing sale price of one share of Common Stock as reported on the national securities exchange on which such shares are then listed is greater than or equal to $20.00 for a period of at least twenty out of thirty consecutive Trading Days. The Aggregate Earn-out Consideration may also vest upon a transaction or series of transactions the result of which is (a) the acquisition by any person or “group” (as defined in the Exchange Act of 1934, as amended (the “Exchange Act”)) of persons of direct or indirect beneficial ownership of securities representing 50% or more of the combined voting power of the then outstanding securities of New USARE, (b) a merger, consolidation, reorganization or other business combination, however effected, resulting in any person or “group” (as defined in the Exchange Act) acquiring at least 50% of the combined voting power of the then outstanding securities of New USARE or the surviving person outstanding immediately after such combination; or (c) a sale of all or substantially all of the assets of New USARE (“Change of Control”), pursuant to which New USARE or its shareholders have the right to receive consideration if the implied value per share of Common Stock is equal to or above such price targets, with the amount of such consideration dependent upon the implied per share value reaching the thresholds discussed above. Should the implied value per share of Common Stock pursuant to a Change of Control be less than $15.00, then the vesting conditions discussed above shall no longer apply and no further shares of Common Stock will be issued as Aggregate Earn-out Consideration.

In connection with the Closing:

i. USARE OpCo and New USARE entered into the A&R Operating Agreement, to, among other things, admit New USARE as the manager of USARE OpCo; and

ii. Inflection Point filed with the Secretary of State of the State of Delaware a Certificate of Designations of Preferences, Rights and Limitations of 12% Series A Cumulative Convertible Preferred Stock Series A Preferred Stock (the “Series A Preferred Stock Certificate of Designation”) which sets forth the rights, preferences and privileges of the Series A Preferred Stock (as defined below).

### Series A Preferred Stock Investment

In connection with the transactions contemplated by the Business Combination Agreement, on the Signing Date, Inflection Point, USARE OpCo and Inflection Point Fund I, LP (“Inflection Point Fund”), an accredited investor that is an affiliate of Inflection Point and Inflection Point Holdings II LLC (the “Sponsor”) entered into a Securities Purchase Agreement (the “Series A SPA”). Pursuant to the Series A SPA, Inflection Point Fund agreed, among other things, to purchase, at Closing, shares of New USARE’s 12% Series A Cumulative Convertible Preferred Stock, par value $0.0001 per share, having the rights, preferences and privileges set forth in the Series A Preferred Stock Certificate of Designation (such stock the “Series A Preferred Stock”) and a warrant to purchase a number of shares of Common Stock equal to the amount of shares into which such shares of Common Stock underlying the Series A Preferred Stock are initially convertible (a “Series A Preferred Investor Warrant”), for an aggregate purchase price of $9,117,648 (the “Series A Preferred Stock Investment”). Each share of Series A Preferred Stock has a stated value of $12.00 (the “Stated Value”). Subsequently, on February 3, 2025, Inflection Point Fund pre-funded the Series A Preferred Stock Investment by purchasing an aggregate of 833,333 additional USARE Class A-2 Convertible Preferred Units and a USARE Class A Preferred Investor Warrant exercisable for an aggregate of 833,333 USARE Class A Units for an aggregate purchase price of approximately $8.5 million as part of an additional investment into USARE Class A-2 Convertible Preferred Units. Pursuant to a termination agreement, dated as of January 31, 2025, by and among Inflection Point, USARE and Inflection Point Fund (the “Series A SPA Termination Agreement”), upon the pre-funding of the Series A Preferred Stock Investment, the Series A SPA was terminated.

In addition, pursuant to a Securities Purchase Agreement, dated as of August 21, 2024, as amended on January 22, 2025, by and among Inflection Point, Michael Blitzer (the Company’s Chairman and then-Chief Executive Officer) and USARE OpCo, Inflection Point agreed to issue at Closing, a number of shares of Series A Preferred Stock equal to the number of Blitzer Conversion Preferred Shares (as defined in the Proxy Statement/Prospectus) of Series A Preferred Stock to Mr. Blitzer exchange for his forgiveness of 50% of the then-outstanding balance of the convertible promissory note issued to him by the Company on August 13, 2024 (the “Convertible Promissory Note”). This Securities Purchase was Agreement was in substantially the form of the Series A SPA, subject to appropriate changes to reflect that (i) the consideration to be paid by Mr. Blitzer was his forgiveness of 50% of the then-outstanding balance of the Convertible Promissory Note and (ii) Mr. Blitzer did not receive a Series A Preferred Investor Warrant for such forgiveness.

On March 11, 2025, Inflection Point and USARE OpCo entered into additional securities purchase agreements with Inflection Point Fund and another accredited investor, Alto Opportunity Master Fund, SPC – Segregated Master Portfolio B (together with Inflection Point Fund, the “Additional Series A Cumulative Convertible Preferred Stock Investors”), pursuant to which the Additional Series A Cumulative Convertible Preferred Stock Investors agreed to purchase an aggregate of (i) 784,314 shares of Series A Preferred Stock and (ii) Series A Preferred Investor Warrants exercisable for an aggregate of 784,314 shares of Common Stock, subject to adjustment, for an aggregate purchase price of $8.0 million. This transaction closed as part of the Business Combination on March 13, 2025.

### Sponsor Support Agreement

Concurrently with the execution of the Business Combination Agreement, the Sponsor, Inflection Point and USARE OpCo entered into a sponsor support agreement (the “Sponsor Support Agreement”), pursuant to which, among other things, the Sponsor agreed to (i) vote to adopt and approve the Business Combination Agreement and the other documents contemplated therein and the transactions contemplated therein and (ii) forfeit 60,000 New USARE Warrants for every $1,000,000 by which (x) the gross proceeds at the Closing from the Trust Account (after giving effect to the Redemption plus (y) the gross proceeds from the Class A Preferred Unit Investment (as defined in the UASRE Business Combination Agreement), the Series A Preferred Stock Investment and any PIPE Investment (as defined in the Business Combination Agreement) are below $50,000,000, up to a maximum of 1,500,000 New USARE Warrants forfeited. On January 31, 2025, the Sponsor, Inflection Point and USARE OpCo entered into an amendment to the Sponsor Support Agreement to eliminate the potential forfeiture of New USARE Warrants by the Sponsor.

### Member Support Agreement

Concurrently with the execution of the Business Combination Agreement, Inflection Point entered into a member support agreement (the “Member Support Agreement”) with USARE OpCo and certain members of USARE OpCo (the “Supporting USARE Members”) pursuant to which each such Supporting USARE Members agreed to, among other things, support and vote in favor of the Business Combination Agreement, and the transactions contemplated therein (including the Merger).

### Fee Reduction Agreement

Pursuant to that certain underwriting agreement between Inflection Point and Cantor Fitzgerald & Co., as representative of the several underwriters (“CF&CO”), dated May 24, 2023 (as it may be amended from time to time, the “Underwriting Agreement”), Inflection Point previously agreed to pay to CF&CO an aggregate cash amount of $13,100,000 as “deferred underwriting commissions” (the “Original Deferred Fee”) upon the consummation of an initial business combination, as contemplated by the final prospectus of Inflection Point, filed with the SEC (File No. 333- 271128), and dated May 24, 2024. Solely in connection with the Business Combination, Inflection Point, CF&CO and USARE OpCo entered into that certain fee reduction agreement, dated as of August 20, 2024 (the “Fee Reduction Agreement”), pursuant to which, upon consummation of the Business Combination, CF&CO accepted, in lieu of such Original Deferred Fee: (i) either (at Inflection Point’s option) (A) a cash fee of $4,000,000 or (B) (1) a cash fee of $2,000,000 plus (2) 400,000 shares of Common Stock, plus (ii) 2.0% of the amount by which the Total Capital Raised (as defined in the Fee Reduction Agreement) exceeded $50,000,000. Additionally, solely if Inflection Point elected to pay the all-cash fee discussed above, CF&CO would forfeit 1,650,000 private placement warrants. In connection with the Closing of the Business Combination, Inflection Point elected to pay, and paid the all-cash fee discussed above, and CF&CO forfeited 1,650,000 warrants.

### Amendment No. 1 to Business Combination Agreement

On November 12, 2024, Inflection Point and USARE OpCo entered into that certain Amendment No. 1 to the Business Combination Agreement (the “BCA Amendment”). The BCA Amendment:

(i) amends Section 2.02(b) and Section 2.03(b)(iii) to provide that in connection with the Business Combination, each USARE Class A Preferred Investor Warrant shall be cancelled and converted into the right to receive a Domesticated Purchaser Series A Preferred Investor Warrant (as defined in the Business Combination Agreement) exercisable for a number of shares of Common Stock of New USARE equal to the aggregate number of Class A units of USARE OpCo that would be issued upon full exercise of such USARE Class A Preferred Investor Warrant; and

(ii) amends Article X to define the term “Expiration Time” with respect to the Member Support Agreement (as defined in the Business Combination Agreement) to mean the earlier of the Closing or the termination of the Business Combination Agreement.

### Amendment No. 2 to the Business Combination Agreement

On January 30, 2025, Inflection Point and USARE OpCo entered into that certain Amendment No. 2 to the Business Combination Agreement to, among other matters, set out the directors of the New USARE, address certain other governance matters and modify certain document delivery conditions.

### Forward Purchase Agreements

On March 11, 2025, Inflection Point and USARE OpCo entered into (i) a forward purchase agreement with Harraden Circle Investors LP, Harraden Circle Special Opportunities LP and Harraden Circle Strategic Investments LP (collectively, “Harraden,” and such agreement, the “Harraden Forward Purchase Agreement”), (ii) a forward purchase agreement with Newtyn TE Partners, LP and Newtyn Partners, LP (collectively, “Newtyn,” and such agreement, the “Newtyn Forward Purchase Agreement”), and (iii) a forward purchase agreement with L1 Capital Global Opportunities Master Fund (“L1,” and such agreement, the “L1 Forward Purchase Agreement,” and together with the Harraden Forward Purchase Agreement and the Newtyn Forward Purchase Agreement, the “Forward Purchase Agreements”), each for over-the-counter Equity Prepaid Forward Transactions (each, a “Forward Purchase Transaction” and, together, the “Forward Purchase Transactions”). Each Forward Purchase Agreement amended, restated and superseded in its entirety a separate forward purchase agreements with each of the sellers, dated March 10, 2025, which had identical terms to those described herein, except that the Reset Price (as defined in the Forward Purchase Agreements) was not subject to the floor price described below. For purposes of the Forward Purchase Agreements, each of Harraden, Newtyn and L1 are referred to, individually, as a “Seller” and, collectively, as the “Sellers”). For purposes of the Forward Purchase Agreements, Inflection Point and USARE OpCo are referred to as the “Counterparty” prior to and after the Business Combination, respectively.

Pursuant to the terms of the Forward Purchase Agreements, (i) Harraden agreed to hold up to 892,825 public shares, (ii) Newtyn agreed to hold up to 700,000 public shares, and (iii) L1 agreed to hold up to 297,669 public shares in connection with the Closing. For purposes of the Forward Purchase Agreements, the public shares held by each Seller are referred to as such Seller’s “FPA Shares.” Each Seller, acting separately and solely for its own account, was permitted, if necessary, to (i) reverse its previous election to redeem its public shares in connection with the Business Combination pursuant to the redemption rights set forth in Inflection Point’s amended and restated memorandum and articles of association or (ii) purchase public shares through a broker in the open market from holders of public shares (other than Inflection Point), including from holders who previously elected to redeem their public shares in connection with the Business Combination pursuant to the redemption rights set forth in Inflection Point’s amended and restated memorandum and articles of association. The aggregate number of shares subject to each Forward Purchase Agreement (the “Number of Shares”) was the aggregate number of FPA Shares as notified to Counterparty by the applicable Seller, but in no event more than such Seller’s number of FPA Shares set forth above. Each Seller notified the Counterparty that it would subject the maximum Number of Shares to their respective Forward Purchase Agreements. The Number of Shares was subject to reduction following the full or partial optional early termination of the Forward Purchase Agreements as described below.

Each Forward Purchase Agreement provides that no later than the earlier of (a) one business day after the Closing and (b) the date any assets from Inflection Point’s trust account are disbursed in connection with the Business Combination, the Seller under such Forward Purchase Agreement was paid directly, out of the funds held in Inflection Point’s trust account, an amount (the “Prepayment Amount”) equal to the product of (i) the Number of Shares and (ii) an amount (the “Initial Price”) equal to the redemption price per share payable to investors who elected to redeem in connection with the Business Combination.

From time to time on any day the Nasdaq is open for trading following the date of the Closing (any such date, an “OET Date”), each Seller may, in its absolute discretion, elect to sell any and all FPA Shares it owns. Any such sale shall automatically terminate such Seller’s Forward Purchaser Transaction in whole or in part with respect to any such number of sold shares. Seller shall, on any day of such OET Date, give written notice to the Counterparty of such termination and specify the number of sold FPA Shares (such quantity, the “Terminated Shares”). As of each OET Date, the Counterparty shall be entitled from Seller, and the Seller shall pay to the Counterparty, an amount equal to the product of (a) the then in effect Reset Price (as defined in the Forward Purchase Agreement and subject to a floor of $4.00) and (b) the number of Terminated Shares.

Each Forward Purchase Agreement’s maturity date is the date 90 days after the Closing (the “Maturity Date”). Upon the occurrence of the Maturity Date, in exchange for delivery of the then Number of Shares under each Forward Purchase Transaction, the Counterparty shall pay each Seller an amount (the “Maturity Consideration”) equal to (i) the number of FPA Shares less the number of Terminated Shares multiplied by (ii) the Initial Price. The Seller will retain the Maturity Consideration from the Prepayment Amount paid by the Counterparty to the Seller.

Each of the Forward Purchase Agreements could be terminated by any of the parties thereto if any of the following events occur: (a) it being, or, as a consequence of a change in law, regulation or interpretation, it becomes or will become, unlawful for the Seller to perform any of its obligations contemplated by a Forward Purchase Agreement, or (b) upon the occurrence of any Material Adverse Change (as defined in the Forward Purchase Agreements) of the Counterparty. Upon any termination that occurs following the Closing due to clauses (a) or (b) above, Counterparty shall be obligated to promptly accept for redemption all of Seller’s shares in exchange for the Initial Price.

### Closing of the Business Combination

The Business Combination closed on March 13, 2025. For additional information regarding the USARE Business Combination see the Company’s Current Report on Form 8-K (File No. 001-41711) filed by New USARE on March 19, 2025, and the Proxy Statement/Prospectus.

### Liquidity, Capital Resources and Going Concern

Until the consummation of the IPO, our only source of liquidity was an initial purchase of shares of Class B ordinary shares, par value $0.0001 per share, by the Sponsor and loans from the Sponsor.

On May 30, 2023, we consummated the IPO of 25,000,000 Units, which included the partial exercise by the underwriters of their over-allotment option in the amount of 3,000,000 Units, at $10.00 per Unit, generating gross proceeds of $250,000,000. Simultaneously with the closing of the IPO, we consummated the sale of 7,650,000 private placement warrants to the Sponsor and CF&CO, the representative of the underwriters of the IPO, at a price of $1.00 per private placement warrant, generating gross proceeds of $7,650,000.

Following the IPO and the private placements, a total of $251,250,000 ($10.05 per Unit) was placed in the Trust Account. We incurred transaction costs of $18,361,877 consisting of $4,400,000 of cash underwriting discount, $13,100,000 of deferred underwriting fees, and $861,877 of other offering costs.

For the year ended December 31, 2024, cash used in operating activities was $1,398,564. Net income of $7,899,035 was affected by dividend income earned on marketable securities held in the Trust Account of $12,019,932, change in fair value of Forward Purchase Agreement of $435,568 and loss on issuance of Forward Purchase Agreements of $484,843. Changes in operating assets and liabilities used $2,673,058 of cash for operating activities.

As of December 31, 2024, we had marketable securities held in the Trust Account of $24,075,435 consisting of U.S. government treasury obligations with maturity of 185 days or less or interests in money market funds meeting certain conditions under Rule 2a-7 under the Investment Company Act, which invest only in direct U.S. government treasury obligations. We were permitted withdraw interest from the Trust Account to pay taxes, if any. We intended to use substantially all of the funds held in the Trust Account, including any amounts representing interest earned on the Trust Account (less deferred underwriting commissions and taxes payable), to complete our initial business combination.

As of December 31, 2024, we had cash of $2,101. Prior to the Business Combination, our intent was to use the funds held outside the Trust Account primarily to identify and evaluate target businesses, perform business due diligence on prospective target businesses, travel to and from the offices, plants or similar locations of prospective target businesses or their representatives or owners, review corporate documents and material agreements of prospective target businesses, structure, negotiate and complete a business combination, to pay for directors and officers liability insurance premiums and to pay an aggregate of $27,083 per month (the “Monthly Fee”) to The Venture Collective LLC (“TVC”), an affiliate of one of our directors, Nicholas Shekerdemian, for the services of Peter Ondishin, Chief Financial Officer, and Kevin Shannon, Chief of Staff. On March 28, 2024, we entered into the Amendment to the Services and Indemnification Agreement, pursuant to which, the Monthly Fee paid to TVC, effective as of January 1, 2024, was reduced from $27,083 to (i) $17,708 for the period from January 1, 2024 to January 31, 2024 and (ii) $24,091 for the period starting February 1, 2024. On August 9, 2024, the Company entered into the Amendment to the Services and Indemnification Agreement pursuant to which, the Monthly Fee paid to TVC, effective as of April 1, 2024, was reduced from $24,091 to $18,882 for the period starting April 1, 2024. The Monthly Fee was further reduced from $18,882 to $14,746 for the period starting September 1, 2024. On November 8, 2024, the Company entered into the Third Amendment to the Services and Indemnification Agreement pursuant to which, the Monthly Fee paid to TVC, effective as of November 1, 2024, was reduced from $14,746 to $7,373 for the period starting October 1, 2024. Upon completion of the Business Combination, the Company ceased paying the Monthly Fee. For the year ended December 31, 2024 and for the period from March 6, 2023 (inception) through December 31, 2023, the Company incurred $204,541 and $196,806 for these services, respectively.

In order to finance working capital or to finance transaction costs in connection with an intended initial business combination, the Sponsor or an affiliate of the Sponsor or certain of the Company’s officers and directors was permitted, but not obligated to, loan the Company funds as may be required (the “Working Capital Loans”). In the event that the initial Business Combination did not close, the Company was permitted to use a portion of the working capital held outside the Trust Account to repay the Working Capital Loans but no proceeds from the Trust Account would have been used to repay the Working Capital Loans. Up to $1,500,000 of the Working Capital Loans was convertible into private placement warrants of the post Business Combination entity at a price of $1.00 per private placement warrant at the option of the lender. Such warrants would have been identical to the private placement warrants.

On August 13, 2024, to document existing and future Working Capital Loans, the Company issued the Convertible Promissory Note to Michael Blitzer, the Company’s Chairman and then-Chief Executive Officer, pursuant to which the Company was permitted to borrow up to $2,500,000 from Mr. Blitzer, related to ongoing expenses reasonably related to the business of the Company and the consummation of an initial business combination.

All unpaid principal under the Convertible Promissory Note was due and payable in full on the earlier of (i) August 21, 2025, or such later date by which the Company must consummate a Business Combination pursuant to its governing documents (as may be amended by a shareholder vote) and (ii) the effective date of an initial business combination, unless accelerated upon the occurrence of an event of default as set forth in the Convertible Promissory Note. Mr. Blitzer had the option, at any time on or prior to the repayment of amounts owed under the Convertible Promissory Note, to convert up to $1,500,000 outstanding under the Convertible Promissory Note into warrants to purchase Class A ordinary shares at a conversion price of $1.00 per warrant, with each warrant entitling the holder to purchase one Class A ordinary share at a price of $11.50 per share, subject to the same adjustments applicable to the private placement warrants. As of December 31, 2024, we had an outstanding borrowing of $1,200,000 under the Convertible Promissory Note.

Pursuant to a Securities Purchase Agreement, dated as of August 21, 2024, as amended on January 22, 2025, by and among Inflection Point, Michael Blitzer and USARE OpCo, Inflection Point agreed to issue at Closing, a number of shares of Series A Preferred Stock equal to the number of Blitzer Conversion Preferred Shares (as defined in below) to Mr. Blitzer exchange for his forgiveness of 50% of the then-outstanding balance of the Convertible Promissory Note. In addition, pursuant to a Securities Purchase Agreement, dated as of August 21, 2024, by and between USARE OpCo and Mr. Blitzer, USARE OpCo issued 122,549 USARE Class A-2 Convertible Preferred Units and a warrant to purchase up to 31,250 USARE Class A Units in exchange for Mr. Blitzer’s promise to forgive, at the closing of the Proposed Business Combination, the other 50% of the then-outstanding balance of the Convertible Promissory Note. Such amounts were forgiven upon the Closing for the consideration described above.

As of December 31, 2024, we believed that amounts not held in trust were not sufficient to pay the costs and expenses that are payable prior to the closing of our initial business combination. Our costs were primarily expected to be incurred in connection with identifying a target business, undertaking in-depth due diligence and negotiating a business combination. As of December 31, 2024, our officers, directors and our Sponsor were permitted, but not obligated to, loan us funds as may be required. Accordingly, we may not be able to obtain additional financing. If we are unable to raise additional capital, we may be required to take additional measures to conserve liquidity, which could include, but not necessarily be limited to, curtailing operations, suspending the pursuit of a potential transaction, and reducing overhead expenses. We cannot provide any assurance that new financing will be available to us on commercially acceptable terms, if at all. These conditions raise substantial doubt about our ability to continue as a going concern for a reasonable period of time which is considered to be one year from the date of the issuance of the financial statements, or, if earlier, the date that we would have been required to cease all operations, except for the purpose of winding up, if a business combination was not consummated. The financial statements do not include any adjustments relating to the recovery of the recorded assets or the classification of the liabilities that might be necessary should we be unable to continue as a going concern.

On March 13, 2025, Inflection Point consummated the Business Combination with USARE OpCo and substantially all of the assets and the business of the combined company are held and operated by New USARE and its subsidiaries. New USARE has generated no revenues since inception, continues to incur losses from operations, and has an accumulated deficit. Following the Closing, New USARE’s ability to continue as a going concern is dependent upon its ability to raise capital, to implement its business plan, generate sufficient revenues, and to control operating expenses. As of March 28, 2025, New USARE had cash of approximately $23.4 million.

### Off-Balance Sheet Arrangements

We have no obligations, assets or liabilities, which would be considered off-balance sheet arrangements as of December 31, 2024. We do not participate in transactions that create relationships with unconsolidated entities or financial partnerships, often referred to as variable interest entities, which would have been established for the purpose of facilitating off-balance sheet arrangements. We have not entered into any off-balance sheet financing arrangements, established any special purpose entities, guaranteed any debt or commitments of other entities, or purchased any non-financial assets.

### Contractual obligations

As of December 31, 2024, we did not have any long-term debt, capital lease obligations, operating lease obligations or long-term liabilities, other than an agreement to pay an aggregate of $27,083 per month to TVC, for the services of Peter Ondishin, Chief Financial Officer, and Kevin Shannon, Chief of Staff. We began incurring such fees on May 24, 2023, and no longer incur these fees monthly as of the consummation of the Business Combination. On March 28, 2024, Inflection Point entered into the Amendment to the Services and Indemnification Agreement pursuant to which, the Monthly Fee paid to TVC, effective as of January 1, 2024, was reduced from $27,083 to (i) $17,708 for the period from January 1, 2024 to January 31, 2024 and (ii) $24,091 for the period starting February 1, 2024. On August 9, 2024, Inflection Point entered into the Amendment to the Services and Indemnification Agreement pursuant to which, the Monthly Fee paid to TVC, effective as of April 1, 2024, was reduced from $24,091 to $18,882 for the period starting April 1, 2024. The Monthly Fee was further reduced from $18,882 to $14,746 for the period starting September 1, 2024. On November 8, 2024, Inflection Point entered into the Third Amendment to the Services and Indemnification Agreement pursuant to which, the Monthly Fee paid to TVC, effective as of November 1, 2024, was reduced from $14,746 to $7,373 for the period starting October 1, 2024. Upon consummation of the Business Combination, the Company ceased paying the Monthly Fee.

The underwriters were entitled to a deferred underwriting commission of 5.0% on the base deal and an additional 7.0% on the Units sold pursuant to the underwriters’ option to purchase additional Units, or $13,100,000 in the aggregate, of the gross proceeds of the IPO held in the Trust Account upon the completion of Inflection Point’s initial business combination subject to the terms of the underwriting commission.

Pursuant to the Fee Reduction Agreement, solely in connection with the Business Combination, upon consummation of the Business Combination, CF&CO accepted, in lieu of such Original Deferred Fee: (i) either (at Inflection Point’s option) (A) a cash fee of $4,000,000 or (B) (1) a cash fee of $2,000,000 plus (2) 400,000 shares of Common Stock, plus (ii) 2.0% of the amount by which the Total Capital Raised (as defined in the Fee Reduction Agreement) exceeded $50,000,000. Additionally, solely if Inflection Point elected to pay the all-cash fee discussed above, CF&CO agreed to forfeit 1,650,000 private placement warrants. We elected to pay the all-cash fee discussed above and such payment was made and such private placement warrants were forfeited in connection with the Closing of the Business Combination.

### Critical Accounting Policies

The preparation of financial statements and related disclosures in conformity with accounting principles generally accepted in the United States of America requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, disclosure of contingent assets and liabilities at the date of the financial statements, and income and expenses during the periods reported. Actual results could materially differ from those estimates. We have identified the following critical accounting policies:

### Net Income per Share

Net income per share is computed by dividing net income by the weighted average number of ordinary shares outstanding during the period, excluding ordinary shares subject to forfeiture. Weighted average shares were reduced for the effect of an aggregate of 825,000 Class B ordinary shares that were subject to forfeiture if the over-allotment option was not exercised by the underwriters. At December 31, 2024 and 2023, Inflection Point did not have any dilutive securities and other contracts that could, potentially, be exercised or converted into ordinary shares and then share in the earnings of Inflection Point. As a result, diluted income per share is the same as basic income per share for the periods presented.

### Recent Accounting Standards

In November 2023, the FASB issued ASU 2023-07, Segment Reporting (Topic 280): Improvements to Reportable Segment Disclosures. The amendments in this ASU require disclosures, on an annual and interim basis, of significant segment expenses that are regularly provided to the chief operating officer decision maker (“CODM”), as well as the aggregate amount of other segment items included in the reported measure of segment profit or loss. The ASU requires that a public entity disclose the title and position of the CODM and an explanation of how the CODM uses the reported measure(s) of segment profit or loss in assessing segment performance and deciding how to allocate resources. Public entities will be required to provide all annual disclosures currently required by Topic 280 in interim periods, and entities with a single reportable segment are required to provide all the disclosures required by the amendments in this ASU and existing segment disclosures in Topic 280. This ASU is effective for fiscal years beginning after December 15, 2023, and interim periods within fiscal years beginning after December 15, 2024, with early adoption permitted.

Management does not believe that any recently issued, but not yet effective, accounting standards, if currently adopted, would have a material effect on Inflection Point’s financial statements.

## Market risk

As filed, 163 characters.

We are a smaller reporting company as defined by Rule 12b-2 of the Exchange Act and are not required to provide the information otherwise required under this item.

## Controls and procedures

As filed, 4,743 characters.

### Evaluation of Disclosure Controls and Procedures

Disclosure controls and procedures are designed to ensure that information required to be disclosed by us in our Exchange Act reports is recorded, processed, summarized, and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to our management, including our principal executive officer and principal financial officer or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

Our management, with the participation of our principal executive officer and principal financial officer, we conducted an evaluation of the effectiveness of Inflection Point’s disclosure controls and procedures (as defined in Rule 13a-15(e) under the Exchange Act) as of the end of the fiscal quarter ended December 31, 2024. Based on this evaluation, our principal executive officer and principal financial officer have concluded that as of December 31, 2024, Inflection Point’s disclosure controls and procedures were effective at a reasonable assurance level and, accordingly, provided reasonable assurance that the information required to be disclosed by us in reports filed under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms.

We do not expect that our disclosure controls and procedures will prevent all errors and all instances of fraud. Disclosure controls and procedures, no matter how well conceived and operated can provide only reasonable, not absolute, assurance that the objectives of the disclosure controls and procedures are met. Further, the design of disclosure controls and procedures must reflect the fact that there are resource constraints, and the benefits must be considered relative to their costs. Because of the inherent limitations in all disclosure controls and procedures, no evaluation of disclosure controls and procedure can provide absolute assurance that we have detected all our control deficiencies and instances of fraud, if any. The design of disclosure controls and procedures also is based partly on certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions.

### Management’s Report on Internal Controls Over Financial Reporting

As required by SEC rules and regulations implementing Section 404 of the Sarbanes-Oxley Act, our management is responsible for establishing and maintaining adequate internal control over financial reporting (as defined in Rules 13a-15(f) under the Exchange Act). Inflection Point’s internal control over financial reporting is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of our financial statements for external reporting purposes in accordance with GAAP. Inflection Point’s internal control over financial reporting includes those policies and procedures that:

(1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of our company,

(2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with GAAP, and that our receipts and expenditures are being made only in accordance with authorizations of our management and directors, and

(3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of our assets that could have a material effect on the financial statements.

Our management conducted an assessment of the effectiveness of our internal control over financial reporting based on the criteria set forth by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) in “Internal Control — Integrated Framework (2013).” Based on this assessment, our management concluded that our internal control over financial reporting was effective as of December 31, 2024.

### Changes in Internal Control over Financial Reporting

There were no changes in our internal control over financial reporting (as such term is defined in Rules 13a-15(f) of the Exchange Act) during the most recent fiscal quarter that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

### Attestation report of the registered public accounting firm

This Annual Report does not include an attestation report of our independent registered public accounting firm due to an exemption established by the JOBS Act for emerging growth companies.

Filed Mar 31, 2025.