# Trilogy Metals Inc.: Form 10-K for the period ended Nov 30, 2016

- Company: [Trilogy Metals Inc.](/companies/tmq.md) (CIK 1543418)
- Form: 10-K
- Filed: 2017-02-03
- Accepted by EDGAR: Feb 3, 2017, 09:01 ET
- Period: 2016-11-30
- Accession: 0001279569-17-000161
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1543418/000127956917000161/v457326_10k.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1543418/000127956917000161/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2016-11-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Income tax | 12 months, 2015-12-01 to 2016-11-30 | $0 | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 12 months, 2015-12-01 to 2016-11-30 | −$4.9m | us-gaap:NetIncomeLoss |
| Diluted EPS | 12 months, 2015-12-01 to 2016-11-30 | −$0.05 | us-gaap:EarningsPerShareBasicAndDiluted |
| Operating cash flow | 12 months, 2015-12-01 to 2016-11-30 | −$8.7m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 12 months, 2015-12-01 to 2016-11-30 | $122.0k | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2016-11-30 | $7.3m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2016-11-30 | $15.6m | us-gaap:AssetsCurrent |
| Total assets | at 2016-11-30 | $46.7m | us-gaap:Assets |
| Total liabilities | at 2016-11-30 | $593.0k | us-gaap:Liabilities |
| Shareholders' equity | at 2016-11-30 | $46.2m | us-gaap:StockholdersEquity |

## Business

As filed, 26,797 characters.

Our principal business is the exploration and development of our Upper Kobuk Mineral Projects (“Upper Kobuk Mineral Projects” or “UKMP Projects”) located in the Ambler mining district in Northwest Alaska, United States, comprising the (i) Arctic Project, which contains a high-grade polymetallic volcanogenic massive sulfide (“VMS”) deposit (“Arctic Project”); and (ii) Bornite Project, which contains a carbonate-hosted copper deposit (“Bornite Project”). Our goals include expanding mineral resources and advancing our projects through technical, engineering and feasibility studies so that production decisions can be made on those projects. Our UKMP Projects are held by a wholly-owned subsidiary, NovaCopper US Inc. (“NovaCopper US”) (dba Trilogy Metals US), registered to do business in the State of Alaska.

Name, Address and Incorporation

Trilogy Metals Inc. was incorporated on April 27, 2011 under the name NovaCopper Inc. pursuant to the terms of the *Business Corporations Act* (British Columbia) (“BCBCA”). NovaCopper Inc. changed its name to Trilogy Metals Inc. on September 1, 2016 to better reflect its diversified metals resource base. Our registered office is located at Suite 2600, Three Bentall Centre, 595 Burrard Street, Vancouver, British Columbia, Canada, and our executive office is located at Suite 1950, 777 Dunsmuir Street, Vancouver, British Columbia, Canada.

Corporate Organization Chart

The following chart depicts our corporate structure together with the jurisdiction of incorporation of our subsidiary at November 30, 2016. All ownership is 100%.

Business Cycle

Our business, at its current exploration phase, is cyclical. Exploration activities are conducted primarily during snow-free months in Alaska. The optimum field season at the Upper Kobuk Mineral Projects is from late May to late September. The length of the snow-free season at the Upper Kobuk Mineral Projects varies from about May through November at lower elevations and from July through September at higher elevations.

Trilogy’s Strategy

Our business strategy is focused on creating value for stakeholders through our ownership and advancement of the Arctic Project and exploration of the Bornite Project and through the pursuit of similarly attractive mining projects. We plan to:

- advance the Arctic Project towards development with key activities including increased definition of the NI 43-101 mineral resources, technical studies to support completion of a pre-feasibility or feasibility study, and the advancement of baseline environmental studies;
- advance exploration in the Ambler mining district and, in particular, at the Bornite Project, pursuant to the NANA Agreement (as more particularly described under “*History of Trilogy – Agreement with NANA Regional Corporation”*) through resource development and initial technical studies; and
- pursue project level or corporate transactions that are value accretive.

The Arctic Project PEA represents an early stage study and highlights certain opportunities for us to further expand upon. Prior to commencing production, further studies that demonstrate the economic viability of the Arctic Project must be completed including pre-feasibility or feasibility studies, all necessary permits must be obtained, a production decision must be made by our board of directors (the “Board”), financing for construction and development must be arranged and construction must be completed. In addition, we will be required to address certain infrastructure challenges, including a road for access, transportation of supplies and mineral concentrate, and obtain additional rights, including surface use rights and access rights. See “*Item 1A. Risk Factors.”*

Significant Developments in 2016

- On April 19, 2016, we released an updated resource estimate on the Bornite Project and on May 16, 2016 filed the NI 43-101 compliant Bornite Report (as defined herein). Shallow mineralization located in the Ruby Creek Zones, in the Upper and Lower Reefs are reported within a resource limiting pit shell. Indicated in-pit resources at the Bornite deposit at a 0.50% copper cutoff are 40.5 million tonnes at 1.02% copper grade. Inferred in-pit resources at the Bornite deposit at a 0.50% copper cutoff are 84.1 million tonnes at 0.95% copper grade. In addition to the in-pit resources, Inferred below pit resources at the Bornite deposit are reported (at an elevated 1.5% copper cutoff) as 57.8 million tonnes at 2.89% copper grade. Contained copper in Indicated Resources has increased from 334 to 913 million pounds constituting a 173% increase in contained metal. Total contained copper in Inferred Resources has decreased from 5,696 to 5,450 million pounds (1,768Mlbs in-pit and 3,683Mlbs below-pit) which constitutes a 4% decrease in contained metal due principally to moving in-pit Inferred Resources to the Indicated category. The update incorporated a new 3D lithology, alteration and structural model for the Bornite deposit, as well as results from previously un-sampled or partially sampled historical Kennecott drill core. Inferred resources have a great amount of uncertainty as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred resources will ever be upgraded to a higher category. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. See “Cautionary Note to United States Investors.”
- On August 18, 2016, we announced the sale of our wholly-owned subsidiary Sunward Investments Ltd. (“Sunward Investments”) which indirectly owns the Titiribi property, located in Antioquia Province of Colombia, to Brazil Resources Inc. (“BRI”) in exchange for 5 million common shares of BRI and 1 million warrants. Each warrant is exercisable into one common share of BRI at a price of C$3.50 per BRI common share until September 1, 2018. On September 1, 2016, the close of the transaction, the consideration was valued at $8.2 million.
- On September 8, 2016, the change of our name to Trilogy Metals Inc., which was previously approved by our shareholders, became effective and our shares began trading on the TSX and the NYSE-MKT under the new name and symbol “TMQ”. We changed our name to Trilogy to better reflect the diversity of minerals at our UKMP Projects.
- On October 27, 2016, we released the drill results from the safe and successful 2016 summer field program for the Arctic Project. We completed thirteen diamond drill holes for a total of 3,058 meters of core. The 2016 drill program was designed to collect data for geotechnical, hydrological, waste rock characterization and metallurgical studies as well as further resource definition. Three drill holes representing 822 meters drilled were designed to collect geotechnical and hydrological data within the proposed Arctic open-pit. Four drill holes representing 1,030 meters drilled were designed to collect metallurgical samples, specifically targeting material within the initial production years of the Arctic open-pit. Six drill holes representing 1,206 meters drilled were designed to evaluate vertical and lateral continuity of the high grade polymetallic copper, gold, silver, lead, and zinc mineralization, and support upgrading of Inferred resources to Measured and Indicated resource classification within the area of the proposed Arctic open-pit. We were pleased to announce that all six infill holes encountered mineralized intervals consistent with previous drilling conducted within the resource area on the property. The updated geology domains and drill data will be incorporated into an updated resource estimate that will support a future pre-feasibility study. In addition to the drill program, we conducted an aquatics survey, avian survey, habitat survey, archaeological survey, and wetlands delineation survey, and continued ongoing baseline environmental data collection and acid-base-accounting/metal leaching sampling. The LiDAR survey that was incomplete last year due to weather conditions was also completed during the summer field program.

Significant Developments in 2015

- On June 19, 2015, we announced the completion of a Plan of Arrangement (the “Arrangement”) with Sunward Resources Ltd. (“Sunward”), a publicly listed company on the TSX, resulting in the acquisition of Sunward by Trilogy. Under the terms of the Arrangement, Sunward shareholders received 0.3 of a Trilogy Common Share for each Sunward common share held resulting in the Company issuing approximately 43.1 million Common Shares to Sunward shareholders and Sunward directors holding Sunward deferred share units. Each Sunward stock option outstanding was exchanged for a fully-vested option to purchase Trilogy Common Shares (a “Sunward Arrangement Option”) for a period of 90 days, with the number of shares issuable and exercise price adjusted based on an exchange ratio of 0.3. A total of 2,505,000 Sunward Arrangement Options were issued to holders of Sunward stock options at closing.
- On October 21, 2015, we announced the drill results from our 2015 summer field program for the Arctic Project. In total, fourteen diamond drill holes were completed amounting to a total of 3,056 meters drilled. In addition to the twelve resource estimation drill holes, two drill holes, representing 631 meters drilled, were completed to support preliminary rock mechanics and geotechnical studies and a hydrogeological assessment of the proposed Arctic open-pit. All fourteen drill holes encountered mineralized intervals, defined as a minimum of 1.0 meter copper interval with average grade \>0.7% copper.
- On October 22, 2015, we announced that Alaska’s Governor has authorized AIDEA to begin the environmental impact statement (“EIS”) process on AMDIAP, formerly known as the Ambler Mining District Industrial Access Road.

Significant Developments in 2014

- On March 18, 2014, Trilogy reported an updated NI 43-101 resource estimate for the Bornite Project in a report entitled “NI 43-101 Technical Report on the Bornite Project, Northwest Alaska, USA”, dated effective April 1, 2014, which updated the resource estimate previously released on February 5, 2013. At the base case 0.5% copper cut-off grade, the Bornite Project was estimated to contain in-pit Indicated Resources of 14.1 million tonnes of 1.08% Cu or 334 million pounds of contained copper. At the base case 0.5% copper cut-off grade, the Bornite Project was estimated to contain in-pit Inferred Resources of 109.6 million tonnes of 0.94% Cu or 2,259 million pounds of contained copper. Resources were stated as potentially being economically viable in an open-pit mining scenario based on a projected metal price of $3.00 per pound copper, total site operating costs of $18.00 per tonne, 87% metallurgical recoveries and an average pit slope of 43 degrees. At the base case 1.5% copper cut-off grade, the Bornite Project was estimated to contain below-pit Inferred Resources of 55.6 million tonnes of 2.81% Cu or 3,437 million pounds of contained copper. Inferred resources were stated as potentially being economically viable in an underground mining scenario based on a projected metal price of $3.00 per pound copper, total site operating costs of $66.00 per tonne and an average metallurgical recovery of 87%. Inferred resources have a great amount of uncertainty as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred resources will ever be upgraded to a higher category. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. See “*Cautionary Note to United States Investors.”*
- On July 7, 2014, we announced the completion of a non-brokered private placement of approximately $7.5 million in units to existing shareholders. Each unit was priced at $1.15 per unit and consisted of one Common Share and one Common share purchase warrant. Each common share purchase warrant entitles the holders to purchase one Common Share at a price of $1.60 per share for a period of five years from the closing date. Net proceeds from the private placement were $7.2 million. The gross proceeds raised were allocated for the 12 months following closing to fund $2.7 million on program expenditures, $4.0 million on general and administrative expenses including costs associated with the offering, and $0.8 million on one-time expenses incurred in reducing annual general and administrative expenses.
- On August 15, 2014, we announced the departure of our Senior VP Exploration, VP Human Resources and Workforce Development, and VP Corporate Communications from our senior management team to reduce our general and administrative expenses.
- On October 28, 2014, we announced the results of our 2014 re-logging and re-sampling program at the Bornite Project. During the 2014 field season, we re-logged the geology and re-sampled approximately 13,000 meters in 37 historical drill holes, originally drilled by Kennecott on the Bornite Project between 1959 and 1976, and submitted the samples for a complete 42 element Induced Coupled Plasma analysis. Of the 37 historic drill holes sampled, 5 holes had intervals of copper grading more than 0.5% copper, and 21 holes contained mineralization grading more than 0.2% copper.

### History of Trilogy

### Spin-Out

We were formerly a wholly-owned subsidiary of NovaGold Resources Inc. (“NovaGold”). At a special meeting of securityholders of NovaGold held on March 28, 2012, the securityholders voted in favour of a special resolution approving the distribution of Common Shares of Trilogy to the shareholders of NovaGold as a return of capital through a statutory Plan of Arrangement under the *Companies Act* (Nova Scotia).

On April 30, 2012, all of the outstanding Trilogy Common Shares were distributed to shareholders of NovaGold such that each NovaGold shareholder of record at the close of business on April 27, 2012 received one Trilogy Common Share for every six common shares in the capital of NovaGold held at that time. The Trilogy Common Shares were listed and posted for trading on the TSX and on the NYSE-MKT under its previous symbol, NCQ, and former name, NovaCopper, on April 25, 2012.

### Name Change

We changed our corporate name to Trilogy Metals Inc. from NovaCopper Inc. in 2016 to better reflect the diversity of minerals at our UKMP Projects. On September 8, 2016, upon the opening of the markets our shares began trading on the TSX and the NYSE-MKT under the symbol “TMQ”.

### Agreement with NANA Regional Corporation

On October 19, 2011, NANA Regional Corporation, Inc. (“NANA”), an Alaska Native Corporation headquartered in Kotzebue, Alaska, and NovaCopper US entered an Exploration Agreement and Option Agreement, as amended (the “NANA Agreement”) for the cooperative development of NANA’s respective resource interests in the Ambler mining district of Northwest Alaska. The NANA Agreement consolidates our and NANA’s land holdings into an approximately 142,831-hectare land package and provides a framework for the exploration and any future development of this high-grade and prospective poly-metallic belt.

The NANA Agreement grants NovaCopper US the nonexclusive right to enter on, and the exclusive right to explore, the Bornite lands and the Alaska Native Claims Settlement Act (“ANCSA”) lands (each as defined in the NANA Agreement) and in connection therewith, to construct and utilize temporary access roads, camps, airstrips and other incidental works. In consideration for this right, NovaCopper US paid to NANA $4 million in cash. NovaCopper US is also required to make payments to NANA for scholarship purposes in accordance with the terms of the NANA Agreement. NovaCopper US has further agreed to use reasonable commercial efforts to train and employ NANA shareholders to perform work for NovaCopper US in connection with its operations on the Bornite lands, ANCSA lands and Ambler lands (as defined in the NANA Agreement) (collectively, the “Lands”). Under the NANA Agreement, NANA also has the right to appoint a board member to Trilogy’s Board within a five year period following our public listing on a stock exchange.

The NANA Agreement has a term of 20 years, with an option in favour of NovaCopper US to extend the term for an additional 10 years. The NANA Agreement may be terminated by mutual agreement of the parties or by NANA if NovaCopper US does not meet certain expenditure requirements on the Bornite lands and ANCSA lands.

If, following receipt of a feasibility study and the release for public comment of a related draft environmental impact statement, we decide to proceed with construction of a mine on the Lands, NovaCopper US will notify NANA in writing and NANA will have 120 days to elect to either (a) exercise a non-transferrable back-in-right to acquire an undivided ownership interest between 16% and 25% (as specified by NANA) of that specific project; or (b) not exercise its back-in-right, and instead receive a net proceeds royalty equal to 15% of the net proceeds realized by NovaCopper US from such project (following the recoupment by NovaCopper US of all costs incurred, including operating, capital and carrying costs). The cost to exercise such back-in-right is equal to the percentage interest in the project multiplied by the difference between (i) all costs incurred by NovaCopper US or its affiliates on the project, including historical costs incurred prior to the date of the NANA Agreement together with interest on the costs; and (ii) $40 million (subject to exceptions). This amount will be payable by NANA to NovaCopper US in cash at the time the parties enter into a joint venture agreement and in no event will the amount be less than zero.

In the event that NANA elects to exercise its back-in-right, the parties will as soon as reasonably practicable form a joint venture, with NANA’s interest being between 16% to 25% and NovaCopper US owning the balance of the interest in the joint venture. Upon formation of the joint venture, the joint venture will assume all of the obligations of NovaCopper US and be entitled to all the benefits of NovaCopper US under the NANA Agreement in connection with the mine to be developed and the related Lands. A party’s failure to pay its proportionate share of costs in connection with the joint venture will result in dilution of its interest. Each party will have a right of first refusal over any proposed transfer of the other party’s interest in the joint venture other than to an affiliate or for the purposes of granting security. A transfer by either party of any net proceeds royalty interest in a project other than for financing purposes will also be subject to a first right of refusal. A transfer of NANA’s net smelter return on the Lands is subject to a first right of refusal by NovaCopper US.

In connection with possible development of a mine on the Bornite lands or ANCSA lands, NovaCopper US and NANA will execute a mining lease to allow NovaCopper US or the joint venture to construct and operate a mine on the Bornite lands or ANCSA lands. These leases will provide NANA a 2% net smelter royalty as to production from the Bornite lands and a 2.5% net smelter royalty as to production from the ANCSA lands. If NovaCopper US decides to proceed with construction of a mine on the Ambler lands, NANA will enter into a surface use agreement with NovaCopper US which will afford NovaCopper US access to the Ambler lands along routes approved by NANA on the Bornite lands or ANCSA lands. In consideration for the grant of such surface use rights, NovaCopper US will grant NANA a 1% net smelter royalty on production and an annual payment of $755 per acre (as adjusted for inflation each year beginning with the second anniversary of the effective date of the NANA Agreement and for each of the first 400 acres (and $100 for each additional acre) of the lands owned by NANA and used for access which are disturbed and not reclaimed.

We have formed an oversight committee with NANA, which consists of four representatives from each of Trilogy and NANA (the “Oversight Committee”). The Oversight Committee is responsible for certain planning and oversight matters carried out by us under the NANA Agreement. The planning and oversight matters that are the subject of the NANA Agreement will be determined by majority vote. The representatives of each of Trilogy and NANA attending a meeting will have one vote in the aggregate and in the event of a tie, the Trilogy representatives jointly shall have a deciding vote on all matters other than Subsistence Matters, as that term is defined in the NANA Agreement. There shall be no deciding vote on Subsistence Matters and we may not proceed with such matters unless approved by majority vote of the Oversight Committee or with the consent of NANA, such consent not to be unreasonably withheld or delayed.

Principal Markets

We do not currently have a principal market. Our principal objective is to become a producer of copper.

Specialized Skill and Knowledge

All aspects of our business require specialized skills and knowledge. Such skills and knowledge include the areas of geology, mining and accounting. See “*Executive Officers of Trilogy”* for details as to the specific skills and knowledge of our directors and management.

### Environmental Protection

Mining is an extractive industry that impacts the environment. Our goal is to evaluate ways to minimize that impact and to develop safe, responsible and profitable operations by developing natural resources for the benefit of our employees, shareholders and communities and maintain high standards for environmental performance at our UKMP Projects. We strive to meet or exceed environmental standards at our UKMP Projects. One way we do this is through collaborations with local communities in Alaska, including Native Alaskan groups. Our environmental performance will be overseen at the Board level and environmental performance is the responsibility of the project manager.

- All new activities and operations will be managed for compliance with applicable laws and regulations. In the absence of regulation, best management practices will be applied to manage environmental risk.
- We will strive to limit releases to the air, land or water and appropriately treat and dispose of waste.

See “*Arctic Project – Environmental Considerations.”*

Employees

As of November 30, 2016, we had 7 full-time employees, all of whom were employed at our executive office in Vancouver, BC. The number of individuals employed by us fluctuates throughout the year depending on the season; however, during 2016, we had, on average, 15 employees working for us. We have entered into executive employment agreements with two individuals, the CEO and CFO.

We believe our success is dependent on the performance of our management and key employees, many of whom have specialized skills in exploration in Alaska and the base metals industry. Substantially all of our exploration site employees have been active in the Ambler mining district for the last five years and are knowledgeable as to the geology, metallurgy and infrastructure related to mining development.

### Executive Officers of Trilogy

As of November 30, 2016, we had two executive officers, namely Rick Van Nieuwenhuyse and Elaine Sanders. The following information is presented as of November 30, 2016.

| Name and Residence | Age | Held Office Since | Business Experience During Past Five Years |
| --- | ---: | --- | --- |
| Rick Van Nieuwenhuyse British Columbia, Canada Director, President and Chief Executive Officer | 61 | April 29, 2011(1) | Chief Executive Officer of Trilogy (2011 – present); Former President and Chief Executive Officer of NovaGold |

16

| Name and Residence | Age | Held Office Since | Business Experience During Past Five Years |
| --- | ---: | --- | --- |
| Elaine Sanders British Columbia, Canada VP, Chief Financial Officer and Corporate Secretary | 47 | January 30, 2012(2) | VP and Chief Financial Officer of Trilogy (2012 – present); Corporate Secretary of Trilogy (2011 – present); Vice President, Chief Financial Officer and Corporate Secretary of NovaGold (2011 – 2012); and Vice President Finance of NovaGold (2006 – 2011). |

(1) Mr. Van Nieuwenhuyse was appointed President and Chief Executive Officer on April 29, 2011. He became a full-time employee of the Company on January 9, 2012.

(2) Ms. Sanders was appointed Chief Financial Officer on January 30, 2012. She became a full-time employee of the Company on November 13, 2012.

Segment Information

The Company’s reportable segments are based on geographic region for the Company’s operations. Segment information relating to our assets is provided under the section heading “*Item 8. Financial Statements and Supplementary Data”* below.

Competitive Conditions

The mineral exploration and development industry is competitive in all phases of exploration, development and production. There is a high degree of competition faced by us in Alaska and elsewhere for skilled management employees, suitable contractors for drilling operations, technical and engineering resources, and necessary exploration and mining equipment, and many of these competitor companies have greater financial resources, operational expertise, and/or more advanced properties than us. Additionally, our operations are in a remote location where skilled resources and support services are limited. We have in place experienced management personnel and continue to evaluate the required expertise and skills to carry out our operations. As a result of this competition, we may be unable to achieve our exploration and development in the future on terms we consider acceptable or at all. See “*Item 1A. Risk Factors.”*

Available Information

We make available, free of charge, on or through our website, at www.trilogymetals.com our annual report on Form 10-K, which includes our audited financial statements, our quarterly reports on Form 10-Q, and our current reports on Form 8-K and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act. You may read and copy any materials filed with the SEC free of charge at the SEC’s Public Reference Room, 100 F Street, N.E., Washington, D.C. 20549 and you may obtain information on the operation of the Public Reference Room by calling the SEC at 1-800-SEC-0330. The SEC maintains a website that contains reports, proxy and information statements, and other information at http://www.sec.gov. Our website and the information contained therein or connected thereto are not intended to be, and are not incorporated into this annual report on Form 10-K.

## Risk factors

As filed, 49,374 characters.

Investing in our securities is speculative and involves a high degree of risk due to the nature of our business and the present stage of exploration of our mineral properties. The following risk factors, as well as risks currently unknown to us, could materially adversely affect our future business, operations and financial condition and could cause them to differ materially from the estimates described in forward-looking information relating to Trilogy, or our business, property or financial results, each of which could cause purchasers of securities to lose all or part of their investments.

We have not defined any proven or probable reserves and none of our mineral properties are in production or under development.

We have no history of commercially producing precious or base metals and all of our properties are in the exploration stage. We have not defined or delineated any measured mineral resources or proven or probable reserves on our Upper Kobuk Mineral Projects. Mineral exploration involves significant risk, since few properties that are explored contain bodies of ore that would be commercially economic to develop into producing mines. We cannot assure you that we will establish the presence of any measured resources, or proven or probable reserves at the Upper Kobuk Mineral Projects, or any other properties. The failure to establish measured mineral resources, or proven or probable reserves, would severely restrict our ability to implement our strategies for long-term growth.

We may not have sufficient funds to develop our mineral projects or to complete further exploration programs.

We have limited financial resources. We currently generate no mining operating revenue, and must primarily finance exploration activity and the development of mineral projects by other means. In the future, our ability to continue exploration, development and production activities, if any, will depend on our ability to obtain additional external financing. Any unexpected costs, problems or delays could severely impact our ability to continue exploration and development activities. The failure to meet ongoing obligations on a timely basis could result in a loss or a substantial dilution of our interests in projects.

The sources of external financing that we may use for these purposes include project or bank financing or public or private offerings of equity and debt. In addition, we may enter into one or more strategic alliances or joint ventures, decide to sell certain property interests, or utilize one or a combination of all of these alternatives. The financing alternative we choose may not be available on acceptable terms, or at all. If additional financing is not available, we may have to postpone further exploration or development of, or sell, one or more of our principal properties.

Even if one of our mineral projects is determined to be economically viable to develop into a mine, such development may not be successful.

If the development of one of our projects is found to be economically feasible and approved by our Board, such development will require obtaining permits and financing, the construction and operation of mines, processing plants and related infrastructure, including road access. As a result, we are and will continue to be subject to all of the risks associated with establishing new mining operations, including:

- the timing and cost, which can be considerable, of the construction of mining and processing facilities and related infrastructure;
- the availability and cost of skilled labor and mining equipment;
- the availability and cost of appropriate smelting and refining arrangements;
- the need to obtain necessary environmental and other governmental approvals and permits and the timing of the receipt of those approvals and permits;
- the availability of funds to finance construction and development activities;
- potential opposition from non-governmental organizations, environmental groups or local groups which may delay or prevent development activities; and
- potential increases in construction and operating costs due to changes in the cost of fuel, power, materials and supplies.

The costs, timing and complexities of developing our projects may be greater than anticipated because our property interests are not located in developed areas, and, as a result, our property interests are not currently served by appropriate road access, water and power supply and other support infrastructure. Cost estimates may increase significantly as more detailed engineering work is completed on a project. It is common in new mining operations to experience unexpected costs, problems and delays during construction, development and mine start-up. In addition, delays in the early stages of mineral production often occur. Accordingly, we cannot provide assurance that we will ever achieve, or that our activities will result in, profitable mining operations at our mineral properties.

In addition, there can be no assurance that our mineral exploration activities will result in any discoveries of new mineralization. If further mineralization is discovered there is also no assurance that the mineralization would be economical for commercial production. Discovery of mineral deposits is dependent upon a number of factors and significantly influenced by the technical skill of the exploration personnel involved. The commercial viability of a mineral deposit is also dependent upon a number of factors which are beyond our control, including the attributes of the deposit, commodity prices, government policies and regulation and environmental protection.

The Upper Kobuk Mineral Projects are located in a remote area of Alaska, and access to them is limited. Exploration and any future development or production activities may be limited and delayed by infrastructure challenges, inclement weather and a shortened exploration season.

The Upper Kobuk Mineral Projects are located in a remote area of Alaska. Access to the Upper Kobuk Mineral Projects is limited and there is currently no infrastructure in the area.

We cannot provide assurances that the proposed AMDIAP that would provide access to the Ambler mining district will be permitted or built, that it will be built in a timely manner, that the cost of accessing the proposed road will be reasonable, that it will be built in the manner contemplated, or that it will sufficiently satisfy the requirements of the Upper Kobuk Mineral Projects. In addition, successful development of the Upper Kobuk Mineral Projects will require the development of the necessary infrastructure. If adequate infrastructure is not available in a timely manner, there can be no assurance that:

- the development of the Upper Kobuk Mineral Projects will be commenced or completed on a timely basis, if at all;
- the resulting operations will achieve the anticipated production volume; or
- the construction costs and operating costs associated with the development of the Upper Kobuk Mineral Projects will not be higher than anticipated.

As the Upper Kobuk Mineral Projects are located in a remote area, exploration, development and production activities may be limited and delayed by inclement weather and a shortened exploration season.

We have no history of production and no revenue from mining operations.

We have a very limited history of operations and to date have generated no revenue from mining operations. As such, we are subject to many risks common to such enterprises, including under-capitalization, cash shortages, limitations with respect to personnel, financial and other resources and lack of significant revenues. There is no assurance that the Upper Kobuk Mineral Projects, or any other future projects will be commercially mineable, and we may never generate revenues from our mining operations.

Future sales or issuances of equity securities could decrease the value of any existing Common Shares, dilute investors’ voting power and reduce our earnings per share.

We may sell additional equity securities (including through the sale of securities convertible into Common Shares) and may issue additional equity securities to finance our operations, exploration, development, acquisitions or other projects. We are authorized to issue an unlimited number of Common Shares. We cannot predict the size of future sales and issuances of equity securities or the effect, if any, that future sales and issuances of equity securities will have on the market price of the Common Shares. Sales or issuances of a substantial number of equity securities, or the perception that such sales could occur, may adversely affect prevailing market prices for the Common Shares. With any additional sale or issuance of equity securities, investors will suffer dilution of their voting power and may experience dilution in our earnings per share.

Changes in the market price of copper, gold and other metals, which in the past have fluctuated widely, will affect our ability to finance continued exploration and development of our projects and affect our operations and financial condition.

Our long-term viability will depend, in large part, on the market price of copper, gold and other metals. The market prices for these metals are volatile and are affected by numerous factors beyond our control, including:

- global or regional consumption patterns;
- the supply of, and demand for, these metals;
- speculative activities;
- the availability and costs of metal substitutes;
- expectations for inflation; and
- political and economic conditions, including interest rates and currency values.

We cannot predict the effect of these factors on metal prices. A decrease in the market price of copper, gold and other metals could affect our ability to raise funds to finance the exploration and development of any of our mineral projects, which would have a material adverse effect on our financial condition and results of operations. The market price of copper, gold and other metals may not remain at current levels. In particular, an increase in worldwide supply, and consequent downward pressure on prices, may result over the longer term from increased copper production from mines developed or expanded as a result of current metal price levels. There is no assurance that a profitable market may exist or continue to exist.

Actual capital costs, operating costs, production and economic returns may differ significantly from those described in the PEA.

The PEA technical report for the Arctic Project is an early stage study that is preliminary in nature. There can be no assurance that the results described in the PEA will be realized. The capital costs to take our projects into production may be significantly higher than anticipated.

None of our mineral properties have an operating history upon which we can base estimates of future operating costs. Decisions about the development of the Arctic Project (or the Bornite Project) will ultimately be based upon feasibility studies. Feasibility studies derive estimates of cash operating costs based upon, among other things:

- anticipated tonnage, grades and metallurgical characteristics of the ore to be mined and processed;
- anticipated recovery rates of metals from the ore;
- cash operating costs of comparable facilities and equipment; and
- anticipated climatic conditions.

Cash operating costs, production and economic returns, and other estimates contained in studies or estimates prepared by or for us may differ significantly from those anticipated by the PEA and there can be no assurance that our actual operating costs will not be higher than currently anticipated.

We will incur losses for the foreseeable future.

We expect to incur losses unless and until such time as our mineral projects generate sufficient revenues to fund continuing operations. The exploration and development of our mineral properties will require the commitment of substantial financial resources that may not be available.

The amount and timing of expenditures will depend on a number of factors, including the progress of ongoing exploration and development, the results of consultants’ analyses and recommendations, the rate at which operating losses are incurred, the execution of any joint venture agreements with strategic partners and the acquisition of additional property interests, some of which are beyond our control. We cannot provide assurance that we will ever achieve profitability.

Mineral resource and reserve calculations are only estimates.

Any figures presented for mineral resources in this Form 10-K and in our other filings with securities regulatory authorities and those which may be presented in the future or any figures for mineral reserves that may be presented by us in the future are and will only be estimates. There is a degree of uncertainty attributable to the calculation of mineral reserves and mineral resources. Until mineral reserves or mineral resources are actually mined and processed, the quantity of metal and grades must be considered as estimates only and no assurances can be given that the indicated levels of metals will be produced. In making determinations about whether to advance any of our projects to development, we must rely upon estimated calculations as to the mineral resources and grades of mineralization on our properties.

The estimating of mineral reserves and mineral resources is a subjective process that relies on the judgment of the persons preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While we believe that the mineral resource estimates included in this Form 10-K for the Upper Kobuk Mineral Projects are well-established and reflect management’s best estimates, by their nature mineral resource estimates are imprecise and depend, to a certain extent, upon analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. There can be no assurances that actual results will meet the estimates contained in feasibility studies. As well, further studies are required.

Estimated mineral reserves or mineral resources may have to be recalculated based on changes in metal prices, further exploration or development activity or actual production experience. This could materially and adversely affect estimates of the volume or grade of mineralization, estimated recovery rates or other important factors that influence mineral reserve or mineral resource estimates. The extent to which mineral resources may ultimately be reclassified as mineral reserves is dependent upon the demonstration of their profitable recovery. Any material changes in mineral resource estimates and grades of mineralization will affect the economic viability of placing a property into production and a property’s return on capital. We cannot provide assurance that mineralization can be mined or processed profitably.

Our mineral resource estimates have been determined and valued based on assumed future metal prices, cut-off grades and operating costs that may prove to be inaccurate. Extended declines in market prices for copper, zinc, lead, gold and silver may render portions of our mineralization uneconomic and result in reduced reported mineral resources, which in turn could have a material adverse effect on our results of operations or financial condition. We cannot provide assurance that mineral recovery rates achieved in small scale tests will be duplicated in large scale tests under on-site conditions or in production scale.

A reduction in any mineral reserves that may be estimated by us in the future could have an adverse impact on our future cash flows, earnings, results of operations and financial condition. No assurances can be given that any mineral resource estimates for the Upper Kobuk Mineral Projects will ultimately be reclassified as mineral reserves. See “*Cautionary Note to United States Investors.”*

Significant uncertainty exists related to inferred mineral resources.

There is a risk that inferred mineral resources referred to in this Form 10-K cannot be converted into measured or indicated mineral resources as there may be limited ability to assess geological continuity. Due to the uncertainty that may attach to inferred mineral resources, there is no assurance that inferred mineral resources will be upgraded to resources with sufficient geological continuity to constitute proven and probable mineral reserves as a result of continued exploration. See “*Cautionary Note to United States Investors.”*

Mining is inherently risky and subject to conditions or events beyond our control.

The development and operation of a mine is inherently dangerous and involves many risks that even a combination of experience, knowledge and careful evaluation may not be able to overcome, including:

- unusual or unexpected geological formations;
- metallurgical and other processing problems;
- metal losses;
- environmental hazards;
- power outages;
- labor disruptions;
- industrial accidents;
- periodic interruptions due to inclement or hazardous weather conditions;
- flooding, explosions, fire, rockbursts, cave-ins and landslides;
- mechanical equipment and facility performance problems; and
- the availability of materials and equipment.

These risks could result in damage to, or destruction of, mineral properties, production facilities or other properties, personal injury or death, including to our employees, environmental damage, delays in mining, increased production costs, asset write downs, monetary losses and possible legal liability. We may not be able to obtain insurance to cover these risks at economically feasible premiums, or at all. Insurance against certain environmental risks, including potential liability for pollution and other hazards associated with mineral exploration and production, is not generally available to companies within the mining industry. We may suffer a material adverse effect on our business if we incur losses related to any significant events that are not covered by our insurance policies.

General economic conditions may adversely affect our growth, future profitability and ability to finance.

The unprecedented events in global financial markets in the past several years have had a profound impact on the global economy. Many industries, including the copper mining industry, are impacted by these market conditions. Some of the key impacts of the current financial market turmoil include contraction in credit markets resulting in a widening of credit risk, devaluations, high volatility in global equity, commodity, foreign exchange and precious metal markets and a lack of market liquidity. A worsening or slowdown in the financial markets or other economic conditions, including but not limited to, consumer spending, employment rates, business conditions, inflation, fuel and energy costs, consumer debt levels, lack of available credit, the state of the financial markets, interest rates and tax rates, may adversely affect our growth and ability to finance. Specifically:

- the volatility of copper, gold and other metal prices would impact our estimates of mineral resources, revenues, profits, losses and cash flow, and the feasibility of our projects;
- negative economic pressures could adversely impact demand for our future production, if any;
- construction related costs could increase and adversely affect the economics of any project;
- volatile energy, commodity and consumables prices and currency exchange rates would impact our estimated production costs; and
- the devaluation and volatility of global stock markets would impact the valuation of our equity and other securities.

We cannot provide assurance that we will successfully acquire commercially mineable mineral rights.

Exploration for and development of copper and gold properties involves significant financial risks which even a combination of careful evaluation, experience and knowledge may not eliminate. While the discovery of an ore body may result in substantial rewards, few properties which are explored are ultimately developed into producing mines. Major expenses may be required to establish reserves by drilling, constructing mining and processing facilities at a site, developing metallurgical processes and extracting metals from ore. We cannot ensure that our current exploration and development programs will result in profitable commercial mining operations.

The economic feasibility of development projects is based upon many factors, including the accuracy of mineral resource estimates; metallurgical recoveries; capital and operating costs; government regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting and environmental protection; and metal prices, which are highly volatile. Development projects are also subject to the successful completion of feasibility studies, issuance of necessary governmental permits and availability of adequate financing.

Most exploration projects do not result in the discovery of commercially mineable ore deposits, and no assurance can be given that any anticipated level of recovery of ore reserves, if any, will be realized or that any identified mineral deposit will ever qualify as a commercially mineable (or viable) ore body which can be legally and economically exploited. Estimates of mineral reserves, mineral resources, mineral deposits and production costs can also be affected by such factors as environmental permitting regulations and requirements, weather, environmental factors, unforeseen technical difficulties, the metallurgy of the mineralization forming the mineral deposit, unusual or unexpected geological formations and work interruptions. If current exploration programs do not result in the discovery of commercial ore, we may need to write-off part or all of our investment in our existing exploration stage properties, and may need to acquire additional properties.

Material changes in mineral reserves, if any, grades, stripping ratios or recovery rates may affect the economic viability of any project. Our future growth and productivity will depend, in part, on our ability to develop commercially mineable mineral rights at our existing properties or identify and acquire other commercially mineable mineral rights, and on the costs and results of continued exploration and potential development programs. Mineral exploration is highly speculative in nature and is frequently non-productive. Substantial expenditures are required to:

- establish mineral reserves through drilling and metallurgical and other testing techniques;
- determine metal content and metallurgical recovery processes to extract metal from the ore; and
- construct, renovate or expand mining and processing facilities.

In addition, if we discover ore, it would take several years from the initial phases of exploration until production is possible. During this time, the economic feasibility of production may change. As a result of these uncertainties, there can be no assurance that we will successfully acquire commercially mineable (or viable) mineral rights.

We are subject to significant governmental regulations.

Our exploration activities are subject to extensive federal, state, provincial and local laws and regulations governing various matters, including:

- environmental protection;
- the management and use of toxic substances and explosives;
- the management of natural resources;
- the exploration and development of mineral properties, including reclamation;
- exports;
- price controls;
- taxation and mining royalties;
- management of tailing and other waste generated by operations;
- labor standards and occupational health and safety, including mine safety; and
- historic and cultural preservation.

Failure to comply with applicable laws and regulations may result in civil or criminal fines or penalties or enforcement actions, including orders issued by regulatory or judicial authorities enjoining, curtailing or closing operations or requiring corrective measures, installation of additional equipment or remedial actions, any of which could result in significant expenditures. We may also be required to compensate private parties suffering loss or damage by reason of a breach of such laws, regulations or permitting requirements. It is also possible that future laws and regulations, or more stringent enforcement of current laws and regulations by governmental authorities, could cause us to incur additional expense or capital expenditure restrictions, suspensions or closing of our activities and delays in the exploration and development of our properties.

We require further permits in order to conduct current and anticipated future operations, and delays in obtaining or failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained, would adversely affect our business.

Our current and anticipated future operations, including further exploration, development and commencement of production on our mineral properties, require permits from various governmental authorities. Obtaining or renewing governmental permits is a complex and time-consuming process. The duration and success of efforts to obtain and renew permits are contingent upon many variables not within our control. Due to the preliminary stages of the Upper Kobuk Mineral Projects, it is difficult to assess what specific permitting requirements will ultimately apply.

Shortage of qualified and experienced personnel in the U.S. federal and Alaskan State agencies to coordinate a federally led joint environmental impact statement process could result in delays or inefficiencies. Backlog within the permitting agencies could affect the permitting timeline or potential of the Upper Kobuk Mineral Projects, as may negative public perception of mining projects in general due to circumstances unrelated to the Company and outside of its control. Other factors that could affect the permitting timeline include (i) the number of other large-scale projects currently in a more advanced stage of development which could slow down the review process for the Upper Kobuk Mineral Projects and (ii) significant public response regarding the Upper Kobuk Mineral Projects.

We cannot provide assurance that all permits that we require for our operations, including any for construction of mining facilities or conduct of mining, will be obtainable or renewable on reasonable terms, or at all. Delays or a failure to obtain such required permits, or the expiry, revocation or failure to comply with the terms of any such permits that we have obtained, would adversely affect our business.

Our activities are subject to environmental laws and regulations that may increase our costs and restrict our operations.

All of our exploration, potential development and production activities are subject to regulation by governmental agencies under various environmental laws. These laws address emissions into the air, discharges into water, management of waste, management of hazardous substances, protection of natural resources, antiquities and endangered species and reclamation of lands disturbed by mining operations. Environmental legislation is evolving and the general trend has been towards stricter standards and enforcement, increased fines and penalties for noncompliance, more stringent environmental assessments of proposed projects and increasing responsibility for companies and their officers, directors and employees. Compliance with environmental laws and regulations may require significant capital outlays on our behalf and may cause material changes or delays in our intended activities.

Several regulatory initiatives are currently ongoing within the State of Alaska that have the potential to influence the permitting process for the Upper Kobuk Mineral Projects. These include revisions to Alaska's Water Quality Standards regarding mixing zones regulations, which are currently under EPA review, and which revisions may be required in order to authorize a mixing zone for discharge in Subarctic Creek. Future changes in these laws or regulations could have a significant adverse impact on some portion of our business, requiring us to re-evaluate those activities at that time.

Environmental hazards may exist on our properties that are unknown to us at the present time and that have been caused by previous owners or operators or that may have occurred naturally. We may be liable for remediating such damage.

Failure to comply with applicable environmental laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities, causing operations to cease or to be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions.

Land reclamation requirements for our exploration properties may be burdensome.

Land reclamation requirements are generally imposed on mineral exploration companies (as well as companies with mining operations) in order to minimize long term effects of land disturbance. Reclamation may include requirements to:

- treat ground and surface water to drinking water standards;
- control dispersion of potentially deleterious effluents; and
- reasonably re-establish pre-disturbance land forms and vegetation.

In order to carry out reclamation obligations imposed on us in connection with exploration, potential development and production activities, we must allocate financial resources that might otherwise be spent on further exploration and development programs. In addition, regulatory changes could increase our obligations to perform reclamation and mine closing activities. If we are required to carry out unanticipated reclamation work, our financial position could be adversely affected.

Title and other rights to our properties may be subject to challenge.

We cannot provide assurance that title to our properties will not be challenged. We own mineral claims which constitute our property holdings. We may not have, or may not be able to obtain, all necessary surface rights to develop a property. Title insurance is generally not available for mineral properties and our ability to ensure that we have obtained a secure claim to individual mining properties may be severely constrained. Our mineral properties may be subject to prior unregistered agreements, transfers or claims, and title may be affected by, among other things, undetected defects. We have not conducted surveys of all of the claims in which we hold direct or indirect interests. A successful claim contesting our title to a property will cause us to lose our rights to explore and, if warranted, develop that property or undertake or continue production thereon. This could result in our not being compensated for our prior expenditures relating to the property. In addition, our ability to continue to explore and develop the property may be subject to agreements with other third parties including agreements with native corporations and first nations groups, for instance, the lands at the Upper Kobuk Mineral Projects are subject to the NANA Agreement (as more particularly described under “*History of Trilogy – Agreement with NANA Regional Corporation”).*

Risks inherent in acquisitions of new properties.

We may actively pursue the acquisition of exploration, development and production assets consistent with our acquisition and growth strategy. From time to time, we may also acquire securities of or other interests in companies with respect to which we may enter into acquisitions or other transactions. Acquisition transactions involve inherent risks, including but not limited to:

- accurately assessing the value, strengths, weaknesses, contingent and other liabilities and potential profitability of acquisition candidates;
- ability to achieve identified and anticipated operating and financial synergies;
- unanticipated costs;
- diversion of management attention from existing business;
- potential loss of our key employees or key employees of any business acquired;
- unanticipated changes in business, industry or general economic conditions that affect the assumptions underlying the acquisition;
- decline in the value of acquired properties, companies or securities;
- assimilating the operations of an acquired business or property in a timely and efficient manner;
- maintaining our financial and strategic focus while integrating the acquired business or property;
- implementing uniform standards, controls, procedures and policies at the acquired business, as appropriate; and
- to the extent that we make an acquisition outside of markets in which it has previously operated, conducting and managing operations in a new operating environment.

Acquiring additional businesses or properties could place increased pressure on our cash flow if such acquisitions involve a cash consideration. The integration of our existing operations with any acquired business will require significant expenditures of time, attention and funds. Achievement of the benefits expected from consolidation would require us to incur significant costs in connection with, among other things, implementing financial and planning systems. We may not be able to integrate the operations of a recently acquired business or restructure our previously existing business operations without encountering difficulties and delays. In addition, this integration may require significant attention from our management team, which may detract attention from our day-to-day operations. Over the short-term, difficulties associated with integration could have a material adverse effect on our business, operating results, financial condition and the price of Trilogy Shares. In addition, the acquisition of mineral properties may subject us to unforeseen liabilities, including environmental liabilities, which could have a material adverse effect on us. There can be no assurance that any future acquisitions will be successfully integrated into our existing operations.

Any one or more of these factors or other risks could cause us not to realize the anticipated benefits of an acquisition of properties or companies, and could have a material adverse effect on our financial condition.

High metal prices in past years have encouraged increased mining exploration, development and construction activity, which has increased demand for, and cost of, exploration, development and construction services and equipment.

The relative strength of metal prices in past years has encouraged increases in mining exploration, development and construction activities around the world, which has resulted in increased demand for, and cost of, exploration, development and construction services and equipment. While recent market conditions have had a moderating effect on the costs of such services and equipment, increases in such costs may continue with the resumption of an upward trend in metal prices. Increased demand for and cost of services and equipment could result in delays if services or equipment cannot be obtained in a timely manner due to inadequate availability, and may cause scheduling difficulties due to the need to coordinate the availability of services or equipment, any of which could materially increase project exploration, development and/or construction costs.

We face industry competition in the acquisition of exploration properties and the recruitment and retention of qualified personnel.

We compete with other exploration and producing companies, many of which are better capitalized, have greater financial resources, operational experience and technical capabilities or are further advanced in their development or are significantly larger and have access to greater mineral reserves, for the acquisition of mineral claims, leases and other mineral interests as well as for the recruitment and retention of qualified employees and other personnel. If we require and are unsuccessful in acquiring additional mineral properties or in recruiting and retaining qualified personnel, we will not be able to grow at the rate we desire, or at all.

We may experience difficulty attracting and retaining qualified management and technical personnel to grow our business.

We are dependent on the services of key executives and other highly skilled and experienced personnel to advance our corporate objectives as well as the identification of new opportunities for growth and funding. Mr. Van Nieuwenhuyse and Ms. Sanders are currently our only executive officers. It will be necessary for us to recruit additional skilled and experienced executives. Our inability to do so, or the loss of any of these persons or our inability to attract and retain suitable replacements for them, or additional highly skilled employees required for our activities, would have a material adverse effect on our business and financial condition.

Some of our directors and officers have conflicts of interest as a result of their involvement with other natural resource companies.

Certain of our directors and officers also serve as directors or officers, or have significant shareholdings, in other companies involved in natural resource exploration and development or mining-related activities, including, in particular, NovaGold. To the extent that such other companies may participate in ventures in which we may participate in, or in ventures which we may seek to participate in, our directors and officers may have a conflict of interest in negotiating and concluding terms respecting the extent of such participation. In all cases where our directors and officers have an interest in other companies, such other companies may also compete with us for the acquisition of mineral property investments. Any decision made by any of these directors and officers involving Trilogy will be made in accordance with their duties and obligations to deal fairly and in good faith with a view to the best interests of Trilogy and its shareholders. In addition, each of the directors is required to declare and refrain from voting on any matter in which these directors may have a conflict of interest in accordance with the procedures set forth in the *Business Corporations Act* (British Columbia) and other applicable laws. In appropriate cases, the Company will establish a special committee of independent directors to review a matter in which several directors, or management, may have a conflict. Nonetheless, as a result of these conflicts of interest, the Company may not have an opportunity to participate in certain transactions, which may have a material adverse effect on the Company’s business, financial condition, results of operation and prospects.

In the future, we may be subject to legal proceedings.

Due to the nature of our business, we may be subject to numerous regulatory investigations, claims, lawsuits and other proceedings in the ordinary course of our business. The results of these legal proceedings cannot be predicted with certainty due to the uncertainty inherent in litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges and juries and the possibility that decisions may be reversed on appeal. There can be no assurances that these matters will not have a material adverse effect on our business.

**Our largest shareholder has significant influence on us and may also affect the market price and liquidity of the securities.**

Electrum Strategic Opportunities Fund L.P. (“Electrum”) is our single largest shareholder, controlling approximately 21.3% of the outstanding voting securities. Accordingly, Electrum will have significant influence in determining the outcome of any corporate transaction or other matter submitted to the shareholders for approval, including mergers, consolidations and the sale of all or substantially all of our assets and other significant corporate actions. Unless significant participation of other shareholders takes place in such shareholder meetings, Electrum may be able to approve such matters itself. The concentration of ownership of the shares by Electrum may: (i) delay or deter a change of control of the Company; (ii) deprive shareholders of an opportunity to receive a premium for their shares as part of a sale of the Company; and (iii) affect the market price and liquidity of the shares. Without the consent of Electrum, we could be prevented from entering into transactions that are otherwise beneficial to us. The interests of Electrum may differ from or be adverse to the interests of our other shareholders. The effect of these rights and Electrum’s influence may impact the price that investors are willing to pay for securities. If Electrum sells a substantial number of shares in the public market, the market price of the shares could fall. The perception among the public that these sales will occur could also contribute to a decline in the market price of the shares.

Global climate change is an international concern, and could impact our ability to conduct future operations.

Global climate change is an international issue and receives an enormous amount of publicity. We would expect that the imposition of international treaties or U.S. or Canadian federal, state, provincial or local laws or regulations pertaining to mandatory reductions in energy consumption or emissions of greenhouse gasses could affect the feasibility of our mining projects and increase our operating costs.

Adverse publicity from non-governmental organizations could have a material adverse effect on us.

There is an increasing level of public concern relating to the effect of mining production on our surroundings, communities and environment. Non-governmental organizations (“NGOs”), some of which oppose resource development, are often vocal critics of the mining industry. While we seek to operate in a socially responsible manner, adverse publicity generated by such NGOs related to extractive industries, or our operations specifically, could have an adverse effect on our reputation and financial condition or our relationship with the communities in which we operate.

**We may fail to achieve and maintain the adequacy of our internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act.**

We are required to document and test our internal control procedures in order to satisfy the requirements of Section 404 of SOX. It requires an annual assessment by management of the effectiveness of our internal control over financial reporting. We may in the future fail to achieve and maintain the adequacy of our internal control over financial reporting, as such standards are modified, supplemented or amended from time to time, and we may not be able to ensure that we can conclude on an ongoing basis that we have effective internal control over financial reporting in accordance with Section 404 of SOX. Our failure to satisfy the requirements of Section 404 of SOX on an ongoing, timely basis could result in the loss of investor confidence in the reliability of our financial statements, which in turn could harm our business and negatively impact the trading price of our Common Shares. In addition, any failure to implement required new or improved controls, or difficulties encountered in their implementation, could harm our operating results or cause us to fail to meet our reporting obligations. Future acquisitions of companies may provide us with challenges in implementing the required processes, procedures and controls in our acquired operations. Acquired companies may not have disclosure control and procedures or internal control over financial reporting that are as thorough or effective as those required by securities laws currently applicable to us.

Our business is subject to evolving corporate governance and public disclosure regulations that have increased both our compliance costs and the risk of noncompliance, which could have an adverse effect on our stock price.

We are subject to changing rules and regulations promulgated by a number of United States and Canadian governmental and self-regulated organizations, including the SEC, the Canadian Securities Administrators, the NYSE-MKT, the TSX, and the Financial Accounting Standards Board. These rules and regulations continue to evolve in scope and complexity and many new requirements have been created in response to laws enacted by the United States Congress, making compliance more difficult and uncertain. Our efforts to comply with new rules and regulations, including those promulgated under Dodd-Frank, have resulted in, and are likely to continue to result in, increased general and administrative expenses and a diversion of management time and attention from revenue-generating activities to compliance activities.

Our Common Shares are subject to various factors that have historically made share prices volatile.

The market price of our Common Shares may be subject to large fluctuations, which may result in losses to investors. The market price of the Common Shares may increase or decrease in response to a number of events and factors, including: our operating performance and the performance of competitors and other similar companies; volatility in metal prices; the arrival or departure of key personnel; the number of Common Shares to be publicly traded after an offering; the public’s reaction to our press releases, material change reports, other public announcements and our filings with the various securities regulatory authorities; changes in earnings estimates or recommendations by research analysts who track the Common Shares or the shares of other companies in the resource sector; changes in general economic and/or political conditions; acquisitions, strategic alliances or joint ventures involving us or our competitors; and the factors listed under the heading “*Cautionary Statement Regarding Forward-Looking Information.”*

The market price of the Common Shares may be affected by many other variables which are not directly related to our success and are, therefore, not within our control, including other developments that affect the market for all resource sector securities, the breadth of the public market for the Common Shares and the attractiveness of alternative investments.

We do not intend to pay any cash dividends in the foreseeable future.

We have not declared or paid any dividends on our Common Shares. Our current business plan requires that for the foreseeable future, any future earnings be reinvested to finance the growth and development of our business. We do not intend to pay cash dividends on the Common Shares in the foreseeable future. We will not declare or pay any dividends until such time as our cash flow exceeds our capital requirements and will depend upon, among other things, conditions then existing including earnings, financial condition, restrictions in financing arrangements, business opportunities and conditions and other factors, or our Board determines that our shareholders could make better use of the cash.

We may be a “passive foreign investment company” in future periods, which may have adverse U.S. federal income tax consequences for U.S. shareholders.

U.S. investors in the Company should be aware that we believe we were not a passive foreign investment company (“PFIC”) for the years ending November 30, 2014, 2015 and 2016 but may be a PFIC in future tax years. If we are a PFIC for any year during a U.S. Holder’s (as defined below under *Certain U.S. Federal Income Tax Considerations – U.S. Holders”*) holding period, then such U.S. Holder generally will be required to treat any gain realized upon a disposition of Common Shares and any so-called “excess distribution” received on its Common Shares as ordinary income, and to pay an interest charge on a portion of such gain or distributions, unless the shareholder makes a timely and effective “QEF Election” or a “Mark-to-Market Election” (each as defined below under “*Certain U.S. Federal Income Tax Considerations – Default PFIC Rules under Section 1291 of the Code”*). A U.S. Holder who makes a QEF Election generally must report on a current basis its share of our net capital gain and ordinary earnings for any year in which we are a PFIC, whether or not we distribute any amounts to our shareholders. A U.S. Holder who makes the Mark-to-Market Election generally must include as ordinary income each year the excess of the fair market value of the Common Shares over the U.S. Holder’s tax basis therein. This paragraph is qualified in its entirety by the discussion below the heading “*Certain U.S. Federal Income Tax Considerations.”* Each U.S. shareholder should consult its own tax advisor regarding the PFIC rules and the U.S. federal income tax consequences of the acquisition, ownership, and disposition of Common Shares.

## Properties

As filed, 119,039 characters.

The following descriptions summarize selected information about our Upper Kobuk Mineral Projects, which are located in the Ambler mining district of Alaska and include the Arctic Project and the Bornite Project. All of the UKMP Projects are without known reserves, as defined under SEC Industry Guide 7, and all proposed programs for the properties are exploratory in nature.

Arctic Project, Ambler Mining District, Alaska

Arctic Project – Technical Report

Except with respect to the land size disclosure and the disclosure regarding the number of claims (which were both increased subsequent to the effective date of the PEA), and the information under the heading “*Arctic Project – Current Activities”*, or as otherwise stated, the scientific and technical information relating to the Arctic Project contained in this Form 10-K is derived from, and in some instances is an extract from, the technical report titled “Preliminary Economic Assessment Report on the Arctic Project, Ambler Mining District, Northwest Alaska” dated effective September 12, 2013 prepared by Tetra Tech and EBA, a Tetra Tech Company (and together with Tetra Tech, “Tetra Tech”). Erin Workman, P.Geo., an employee and Director, Technical Services, is a Qualified Person as defined in NI 43-101, and has approved the scientific and technical information contained herein. The information regarding the Arctic Project is based on assumptions, qualifications and procedures which are not fully described herein. Reference should be made to the full text of the PEA which has been filed with certain Canadian securities regulatory authorities pursuant to NI 43-101 and is available for review on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

Arctic Project - Property Description and Location

The Arctic Project is located in the Ambler mining district of the southern Brooks Range, in the Northwest Arctic Borough (“NWAB”) of Alaska. The Arctic Project is located 260 km east of the town of Kotzebue, 30 km north of the village of Kobuk, 260 km west of the Dalton Highway, an all-weather state maintained public road, at geographic coordinates N67.17° latitude and W156.38° longitude (Universal Transverse Mercator (UTM) North American Datum (NAD) 83, Zone 4 coordinates 7453080N, 613110E). The current size of the Ambler lands is approximately 75 km long x 6 km wide and comprises a total of 45,348 ha.

The Ambler lands comprise 45,348 ha of State of Alaska mining claims and US Federal patented mining claims in the Kotzebue Recording District. The Ambler land tenure consists of 1,358 contiguous claims, including 870 40-acre State claims, 481 160-acre State claims, 5 State claims ranging from 2-acre to 8-acre, and two Federal patented claims comprising 110 ha held in the name of NovaCopper US Inc. The Arctic Project is located near the southern edge of the centre of the claim block. The Federal patented claim corners were located by the US Geological Survey. There is no expiration date or labor requirement on the Federal patented claims. Rent for each State claim is paid annually to the Alaska Department of Natural Resources (“ADNR”). An Annual Labor Statement must be submitted annually to maintain the State claims in good standing.

In 1971, the US Congress passed the Alaska Native Claims Settlement Act which settled land and financial claims made by the Alaska Natives and provided for the establishment of 13 regional corporations to administer those claims. These are known as the Alaska Native Regional Corporations. One of these 13 regional corporations is NANA. ANCSA Lands controlled by NANA bound the southern border of the property claim block. National Park lands are within 25 km of the northern property border.

### Figure 1: Regional Location Map

### Figure 2: Upper Kobuk Mineral Projects Lands Prospect Location Map

There are no known environmental liabilities due to previous operators or from our ongoing exploration activities at the Arctic Project. There has been no mine development or production on the Ambler lands.

Multiple permits are required during the exploration phase of the Arctic Project. Permits are issued from Federal, State, and Regional agencies, including: the Environmental Protection Agency (“EPA”), the US Army Corps of Engineers (“USACE”), the Alaska Department of Environmental Conservation (“ADEC”), the Alaska Department of Fish and Game (“ADF&G”), the ADNR, and the NWAB. The State of Alaska permit for exploration on the Arctic Project, the Annual Hardrock Exploration Activity (“AHEA”) Permit, is obtained and renewed every five years through the ADNR – Division of Mining, Land and Water. Trilogy holds an AHEA exploration permit in good standing with the Alaska DNR. The Arctic Project is within the NWAB thus requiring a Title 9 Miscellaneous Land Use permit for mineral exploration, fuel storage, gravel extraction, and the operation of a landfill. NovaGold held these permits in good standing during the 2004 to 2008 seasons and renewed the permits for the 2010 exploration season to 2015. The Bornite Camp, Bornite Landfill, and Dahl Creek Camp are permitted by the ADEC.

A number of statutory reports and payments are required to maintain the claims in good standing on an annual basis. As the Arctic Project progresses, additional permits for environmental baseline and detailed engineering studies will be necessary at federal, state, and local levels.

Arctic Project - Accessibility, Climate, Local Resources, Infrastructure and Physiography

Accessibility is one of the most significant challenges of developing the Arctic Project. There is no developed surface access to the Ambler mining district.

Primary access to the Arctic Project is by air, using both fixed wing aircraft and helicopters. There are four well maintained, approximately 1,500 m-long gravel airstrips located near the Arctic Project, capable of accommodating charter fixed wing aircraft. These airstrips are located 66 km west at Ambler, 46 km southwest at Shungnak, 36 km southwest at Kobuk, and 32 km southwest at Dahl Creek. There is daily commercial air service from Kotzebue to the village of Kobuk, the closest community to the Arctic Project. During the summer months, the Dahl Creek Camp airstrip is suitable for larger aircraft, such as C-130 and DC-6. In addition to the four 1,500 m airstrips, there is a 700 m airstrip located at the Bornite Camp, approximately 25 km southwest of the Arctic Deposit, and a 400 m airstrip located approximately 10 km southwest of the Arctic Deposit. The airstrip at Bornite is suited to smaller aircraft, which support the camp with personnel and supplies. An upgraded one-lane gravel road suitable for vehicles or construction equipment links the Bornite Camp to the Dahl Creek airstrip and camp southwest of the Arctic Deposit.

The climate in the region is typical of a sub-arctic environment. Exploration is generally conducted from late May until late September. Weather conditions on the Ambler lands can vary significantly from year to year and can change suddenly. During the summer exploration season, average maximum temperatures range from 10°C to 20°C, while average lows range from -2°C to 7°C. By early October, unpredictable weather limits regular helicopter travel to the Arctic Project. During winter months, the Arctic Project can be accessed by snow machine, track vehicle, or fixed wing aircraft. Winter temperatures are routinely below -25°C and can exceed -50°C. Annual precipitation in the region averages at 395 mm with the most rainfall occurring from June through September, and the most snowfall occurring from November through January.

The Arctic Project is located along the south slope of the Brooks Range, which separates the Arctic region from the interior of Alaska. Nearby surface waters include Subarctic Creek, the Shungnak and Kogoluktuk Rivers, the Kobuk River, and numerous small lakes. The Arctic Project is located at the eastern end of Subarctic Creek, a tributary of the Shungnak River to the west, along a ridge between Subarctic Creek and the Kogoluktuk River Valley. The property area is marked by steep and rugged terrain with high topographic relief. Elevations range from 30 masl along the Kobuk River to 1,180 masl on a peak immediately north of the Arctic Project area. The divide between the Shungnak and Kogoluktuk Rivers in the Ambler Lowlands is approximately 220 masl. The Kobuk Valley is located at the transition between boreal forest and Arctic tundra. Spruce, birch, and poplar are found in portions of the valley, with a ground cover of lichens (reindeer moss). Willow and alder thickets and isolated cottonwoods follow drainages, and alpine tundra is found at higher elevations. Tussock tundra and low, heath-type vegetation covers most of the valley floor. Intermittent permafrost exists on the Arctic Project.

Wildlife in the area includes caribou, moose, Dall sheep, bears (grizzly and black), wolves, wolverines, coyotes, and foxes. Fish species include salmon, sheefish, arctic char, and arctic grayling. The Kobuk River, which briefly enters the UKMP lands on its southwest corner, is a significant salmon spawning river. Subarctic Creek, which does not contain anadromous fish, drains into the Shungnak River, which drains into the Kobuk River. The caribou on the property belong to the Western Arctic herd that migrates twice a year – south in August, from their summer range north of the Brooks Range, and north in March from their winter range along the Buckland River.

Currently, the Arctic Project does not have access to Alaska power and transportation infrastructure. Beginning in 2009, the Arctic Project has been the focus of the Ambler Mining District Access Corridor study.

The Arctic Deposit proposed access road branches off from the proposed AMDIAP, formerly known as the Ambler Mining District Access Road or AMDIAR, and ends at the Arctic Deposit. Figure 3 shows the overall road location plan showing the relationship of the proposed access road to the proposed Brooks East corridor which eventually connects to the existing Dalton Highway 320 km from the access road intersection. The proposed access road is 17 km long from the AMDIAP corridor to the Arctic Project site.

Figure 3: Proposed Access to the Arctic Project Site

The proposed Arctic Project mine site infrastructure is spread over a distance of approximately 6 km within the upper reaches of the Sub-Arctic Creek Valley. The proposed development for the Arctic Project consists of the following major infrastructure: roads and an airstrip, mill buildings and related services facilities including maintenance and truck shops, assay lab, water supply and distribution, waste management, fuel storage, on site explosive storage, power supply, tailings storage facility (“TSF”) and water management, water treatment plant, construction and permanent camp accommodation, waste rock storage facilities, and communication infrastructure.

The proposed mine-site infrastructure has been located to take advantage of local topography, minimize pumping requirements from the mill building to the TSF, minimize environmental impacts to Sub-Arctic Creek, minimize snow avalanche mitigation requirements, and to reduce the haul distance from the pit to the primary crusher and TSF.

The proposed location for an airstrip sufficient to support project activities is located in the valley approximately 21 km from the Arctic Project site. Geotechnical data is not available for the site but it is assumed that the facility will require permafrost protection to ensure year round operations. The proposed airstrip will operate as a private aerodrome and prior permission will be required for all aircraft utilizing the site. The gravel airstrip will be approximately 1,524 meters long and capable of landing a Dash 8 – Q400/Hercules C130.

The Arctic Project will require power of 15 MW of peak load for 10,000 t/d operation demand. It is proposed that power will be generated by five self-contained 3.6 MW prime diesel generators. Four units will be in service with the fifth unit reserved for maintenance. Heat will be recovered from the generators and used to heat the mill, camp and related facilities.

Arctic Project - History

During the 1940’s and 1950’s Bear Creek Mining Corporation (“BCMC”), an exploration subsidiary of Kennecott, conducted regional reconnaissance exploration in the Cosmos Hills and the southern Brooks Range. Stream silt sampling in 1963 by BCMC revealed a significant copper anomaly in Arctic Creek roughly 17 km northeast of the previously identified Bornite deposit. The area was subsequently staked and, in 1967, eight core holes were drilled at the Arctic Deposit yielding impressive massive sulphide intercepts over an almost 500-m strike length. BCMC conducted intensive exploration on the property until 1977 and then intermittently through 1998. No drilling or additional exploration was conducted on the Arctic Project between 1998 and 2004.

Arctic Project - Historical Metallurgical Testwork

Metallurgical studies during the Kennecott era included: two initial mineralogical studies undertaken by the Kennecott Research Center (“KRC”) to evaluate and identify the potential beneficiation or metallurgical treatment of concentrates of the samples from the deposit and a subsequent 1999 Lakefield Research Ltd. (Lakefield) metallurgical test program to confirm and improve upon the results from the 1970s KRC test work program. In 2012, Trilogy contracted SGS to conduct an extensive metallurgical program in support of the Artic PEA, the results of which are described and summarized below under the heading “*Arctic Project – Metallurgical Testing”.*

Arctic Project - Historical Geophysics

Prior to 1998, Kennecott conducted a series of geophysical surveys which are poorly documented or are unavailable to Trilogy. In March 1998, Kennecott initiated an extensive helicopter-supported airborne electromagnetic (“EM”) and magnetic survey covering the entire VMS belt, including the Arctic Deposit. Kennecott identified eight EM anomalies which were deemed to have significant potential for mineralization and followed-up with additional gravity lines and/or Controlled Source Audio-frequency Magneto-Telluric (“CSAMT”) lines during 1998. Kennecott conducted no further geophysical field exploration in the district after 1998.

Arctic Project - Historical Drilling

Between 1967 and July 1985, Kennecott (BCMC) completed 86 holes (including 14 large diameter metallurgical test holes) totalling 16,080 m. In 1998, Kennecott drilled an additional 6 core holes totalling 1,492 m to test for: 1) extensions of the known Arctic resource; 2) grade and thickness continuity at Arctic; and 3) a nearby airborne geophysical anomaly. Drilling for all BCMC/Kennecott campaigns in the Arctic Deposit area (1966 to 1998) totals 92 core holes for a combined 17,572 m.

No drilling was performed on the project between 1999 and 2003. NovaGold took control of the project in 2004.

Arctic Project - Historical Geochemistry

Historic geochemistry for the district, compiled in the 1998 Kennecott database, includes 2,255 soil samples, 922 stream silt samples, 363 rock samples, and 37 panned concentrate samples. Data has been sourced from several companies including Kennecott, Sunshine Mining, Resource Associates of Alaska, and NANA. Sourcing of much of the data had been poorly documented in the database. During 1998, Kennecott renewed its effort in the district, and, as a follow-up to the 1998 EM survey, undertook directed soil and rock chip sampling in and around EM anomalies generated in the geophysical targeting effort. During this period Kennecott collected 962 soils and 107 rocks and for the first time used extensive multi-element inductively coupled plasma (“ICP”) analysis.

Arctic Project - Geologic Setting

Regional Geology

The Ambler mining district occurs along the southern margin of Brooks Range within an east-west trending zone of Devonian to Jurassic age submarine volcanic and sedimentary rocks. The district covers both: 1) VMS-like deposits and prospects hosted in the Devonian age Ambler Sequence (or Ambler Schist belt), a group of metamorphosed bimodal volcanic rocks with interbedded tuffaceous, graphitic and calcareous volcaniclastic metasediments; and 2) epigenetic carbonate-hosted copper deposits occurring in Devonian age carbonate and phyllitic rocks of the Bornite Carbonate Sequence. The Ambler Sequence occurs in the upper part of the Anirak Schist, the thickest member of the Schist belt or Coldfoot subterrane. VMS-like stratabound mineralization can be found along the entire 110 km strike length of the district. Immediately south of the Schist belt in the Cosmos Hills, a time equivalent section of the Anirak Schist includes the approximately 1 km thick Bornite Carbonate Sequence. Mineralization of both the VMS-like deposits of the Schist belt and the carbonate-hosted deposits of the Cosmos Hills has been dated at 375 to 387 Ma.

In addition, the Ambler mining district is characterized by increasing metamorphic grade north perpendicular to the strike of the east-west trending units. The district shows isoclinal folding in the northern portion and thrust faulting to south (Schmidt 1983). The Devonian to Mississippian age Angayucham basalt and the Triassic to Jurassic age mafic volcanic rocks are in low-angle over thrust contact with various units of the Ambler Schist belt and Bornite Carbonate Sequence along the northern edge of the Ambler Lowlands.

Local/Property Geology

Rocks that form the Ambler Sequence consist of a lithologically diverse sequence of lower Paleozoic Devonian age carbonate and siliciclastic strata with interlayered mafic lava flows and sills and felsic tuffs. The clastic strata, derived from terrigenous continental and volcanic sources, were deposited primarily by mass-gravity flow into the sub-wavebase environment of an extending marginal basin.

Though the Ambler Sequence is exposed over 110 km of strike length, descriptions and comments herein will refer to an area between the Kogoluktuk River on the east and the Shungnak River on the west where we have focused the majority of our exploration efforts over the last decade.

The local base of the Ambler Sequence consists of variably metamorphosed carbonates historically referred to as the Gnurgle Gneiss. We interpret these strata as calc-turbidites, perhaps deposited in a sub-wavebase environment adjacent to a carbonate bank. Calcareous schists overlie the Gnurgle Gneiss and host sporadically distributed mafic sills and pillowed lavas. These fine-grained clastic strata indicate a progressively quieter depositional environment up section, and the presence of pillowed lavas indicates a rifting, basinal environment.

Overlying these basal carbonates and pillowed basalts is a section of predominantly fine-grained carbonaceous siliciclastic rocks which host a significant portion of the mineralization in the district including the Arctic Deposit. This quiescent section indicates further isolation from a terrigenous source terrain.

The section above the Arctic Deposit host stratigraphy contains voluminous reworked silicic volcanic strata with the Button Schist at its base. The Button Schist is a regionally continuous and distinctive albite porphyroblastic unit that serves as an excellent marker above the main mineralized stratigraphy. The paucity of volcanically derived strata below the Arctic Deposit host section and abundance above indicates that the basin and surrounding hinterlands underwent major tectonic reorganization during deposition of the Arctic Deposit section. Greywacke sands that we interpret as channeled high-energy turbidites occur throughout the section but concentrate high in the local stratigraphy.

Several rock units show substantial change in thickness and distribution in the vicinity of the Arctic Deposit that may have resulted from the basin architecture existing at the time of deposition. Between the Arctic Ridge, geographically above the Arctic Deposit, and the Riley Ridge to the west, several significant differences have been documented including: 1) the Gnurgle Gneiss, which is thickest in exposures along the northern extension of Arctic Ridge and appears to thin to the west; 2) mafic lavas and sills which thicken from east to west; they show thick occurrences in upper Subarctic Creek and to the west, but are sparsely distributed to the east; 3) the quartzite section, which within and above the Arctic sulphide horizon does not occur in abundance east of Arctic Ridge; it is thicker and occurs voluminously to the west; 4) the Button Schist which thickens dramatically to the west from exposures on Arctic Ridge; exposures to the east are virtually nonexistent; and 5) Greywacke sands which do not exist east of Subarctic Creek but occur in abundance as massive, channeled accumulations to the west, centered on Riley Ridge.

These data are interpreted by us to define a generally north-northwest-trending depocentre through the central Ambler mining district. Diamictite occurrences described below in concert with these formational changes suggest that the depocentre had a fault-controlled eastern margin with the basin deepening to the west. This original basin architecture appears to have controlled mineralization of the sulphide systems at Ambler and Shungnak (Dead Creek), concentrating fluid flow along structures on the eastern basin margin.

In addition to the underlying pre-deformational structural framework of the district suggested by the stratigraphic thickening of various facies around the Arctic Deposit, the Ambler Sequence is deformed by two penetrative deformational events that significantly complicate the distribution and spatial arrangement of the local stratigraphy; as described below.

F1 Deformation: the earliest penetrative deformation event is associated with greenschist metamorphism and the development of regional schistosity. True isoclinal folds are developed and fold noses typically are thickened. The most notable F1 fold is the Arctic antiform that defines the upper and lower limbs of the Arctic Deposit. The fold closes along a north-northeast- trending fold axis roughly mimicking the trace of Subarctic Creek and opening to the east. Importantly, the overturned lower limb implies that the permissive stratigraphy should be repeated on a lower synformal isocline beneath the currently explored limbs and would connect with the permissive mineralized stratigraphy to the northwest at Shungnak (Dead Creek).

F2 Deformation: the earlier F1 schistosity is in turn deformed by the F2 deformational event that resulted in the local development of an axial planar cleavage. The deformational event is well defined throughout the Schist belt and results in a series of south verging open to moderately overturned folds that define a series of east-west trending folds of similar vergence across the entire Schist belt stratigraphies. This event is likely temporarily related to the emplacement of the Devonian Angayucham volcanics, the obducted Jurassic ophiolites and Cretaceous sediments over the Schist belt stratigraphies. In addition to the earlier penetrative deformation events, a series of poorly defined non-penetrative deformation events, likely as a consequence of Cretaceous extension, are seen as a series of warps or arches across the district. The interplay between the complex local stratigraphy, the isoclinal F1 event, the overturned south verging F2 event and the series of post-penetrative deformational events makes district geological interpretation often extremely difficult at a local scale.

Recent work by us defines the Arctic Deposit as two or more discrete horizons of sulphide mineralization contained in a complexly deformed isoclinal fold with an upright upper limb and an overturned lower limb hosting the main mineral resources. Nearby drilling suggests a third limb, an upright lower limb, likely occurs beneath the currently explored stratigraphy.

Mineralization occurs as stratiform semi-massive sulphide (“SMS”) to massive sulphide (“MS”) beds within primarily graphitic chlorite schists and fine-grained quartz sandstones. The sulphide beds average four meters in thickness but vary from less than one meter up to as much as eighteen meters in thickness. The bulk of the mineralization is within six modelled zones lying along the upper and lower limbs of the Arctic isoclinal anticline. All of the zones are within an area of roughly 1 km2 with mineralization extending to a depth of approximately 250 m below the surface. Mineralization characteristically varies from MS to SMS. Unlike more typical VMS deposits, mineralization is not characterized by steep metal zonation or massive pyritic zones. Mineralization is dominantly sheet-like zones of base metal sulphides with variable pyrite and only minor zonation usually on an extremely small scale. No stockworks or stringer zones in association with the mineralization have been observed. More importantly, the mineralization in general exhibits characteristics and textures common to replacement-style mineralization. Mineralization is predominately coarse-grained sulphides consisting mainly of chalcopyrite, sphalerite, galena, tetrahedrite, arsenopyrite, pyrite and pyrrhotite. Trace amounts of electrum and enargite are also present. Gangue minerals associated with the mineralized horizons include quartz, barite, white mica, black chlorite, talc, calcite, dolomite and cymrite.

Talc and magnesium chlorite are the dominant alteration products associated with the sulphide-bearing horizons. Talc alteration grades downward and outward to mixed talc-magnesium chlorite with minor phlogopite, into zones of dominantly magnesium chlorite, then into mixed magnesium chlorite-phengite with outer phengite-albite zones of alteration. Thickness of alteration zones vary with stratigraphic interpretation, but tens of meters for the outer zones is likely, as seen in phengite-albite exposures on the east side of Arctic Ridge. Stratigraphically above the sulphide-bearing horizons significant muscovite as paragonite is developed and results in a marked shift in sodium/magnesium ratios across the sulphide bearing horizons. Of particular note are the barium (“Ba”) species including barite, cymrite (a high-pressure Ba phyllosilicate), and Ba-bearing muscovite, phlogopite and biotite. These species associated with both alteration and mineralization has also been strongly remobilized during metamorphism.

Historic interpretation of the genesis of the Ambler Schist belt deposits have called for a syngenetic VMS origin with steep thermal gradients in and around seafloor hydrothermal vents resulting in metal deposition due to the rapid cooling of chloride bound base metals. A variety of VMS types have been well documented in the literature (Franklin et al. 2005) with the Ambler Schist belt deposits most similar to deposits associated with a bimodal mafic dominant volcanism related to incipient rifting. The majority of field observations broadly support such a scenario at the Arctic Deposit and include: 1) the tectonic setting with Devonian volcanism in an evolving continental rift; 2) the geologic setting with bimodal volcanics including pillow basalts and limited felsic volcanic tuffs; 3) an alteration assemblage with well-defined magnesium-rich footwall alteration and sodium-rich hanging wall alteration; and 4) typical polymetallic base-metal mineralization with massive and semi-massive sulphides. Although the majority of field observations support a VMS genesis to the deposits of the Schist belt, a series of other observations and characteristics suggest a more direct genetic link with that of the carbonate-hosted Bornite Deposit in the Devonian Bornite Carbonate Sequence. Both deposit types have been dated at 375 to 387 Ma suggesting a clear temporal link.

The principal lithologic units captured in logging and mapping by us, in broad chronological order from oldest to youngest are as follows: greenstone, chlorite schist, talc schist, grey to black schists, metarhyolites, most notably the so-called button schist which serves as an important stratigraphic marker, quartz muscovite schists, diamictites and greywackes.

Arctic Project - Exploration

NovaGold began exploration of the Arctic Deposit and surrounding lands of the Schist belt in 2004 after optioning the property from Kennecott. Previous exploration on the Arctic Project during Kennecott’s tenure is summarized in “*Arctic Project – History”.* Field exploration was largely conducted during the period 2004 to 2007 with associated engineering and characterization studies between 2008 and 2012. Table 2 summarizes the exploration work conducted by NovaGold and us during our tenure from 2004 to 2012.

Table 2: Summary of Trilogy/NovaGold Exploration Activities Targeting VMS-style Mineralization in the Ambler Sequence Stratigraphy and the Arctic Deposit (2004 – 2012)

*Geological Mapping*

| Work Completed | Year | Details | Focus |
| --- | --- | --- | --- |
| - | 2004 | - | Arctic Deposit surface geology |
| - | 2005 | - | Ambler Sequence west of the Arctic Deposit |
| - | 2006 | - | COU, Dead Creek, Sunshine, Red |
| **Geophysical Surveys** |  |  |  |
| SWIR Spectrometry | 2004 | 2004 drill holes | Alteration characterization |
| TDEM | 2005 | 2 loops | Follow-up of Kennecott DIGHEM EM survey |
|  | 2006 | 13 loops | District targets |
|  | 2007 | 6 loops | Arctic extensions |
| Downhole EM | 2007 | 4 drill holes | Arctic Deposit |
| **Geochemistry** |  |  |  |
| - | 2005 | - | Stream silts – core area prospects |
| - | 2006 | - | Soils – core area prospects |
| - |  | - | Stream silts – core area prospects |
| - | 2007 | - | Soils – Arctic Deposit area |
| **Survey** |  |  |  |
| Collar | 2004 to 2011 | GPS | All 2004 to 2011 Trilogy drill holes |
|  | 2004, 2008 | Resurveys | Historical Kennecott drill holes |
| Photography/Topography | 2010 | - | Photography/topography |
| **Technical Studies** |  |  |  |
| Geotechnical | 2010 | BGC | Preliminary geotechnical and hazards |
| ML/ARD | 2011 | SRK | Preliminary ML and ARD |
| Metallurgy | 2012 | SGS | Preliminary mineralogy and metallurgy |
| Geotechnical and Hydrology | 2012 | BGC | Preliminary rock mechanics and hydrology |
| **Project Evaluation** |  |  |  |
| Resource Estimation | 2008 | SRK | Resource estimation |
| PEA | 2011 | SRK | PEA |
|  | 2012 | SRK | PEA update |

Note: SWIR = short wave infrared; ML = metal leaching; BGC = BGC Engineering Inc.; SRK = SRK Consulting

The results of the above exploration programs have been incorporated into the PEA results, summarized under the heading “Arctic Project – Exploration and Development”. For further details, refer to the PEA. Exploration work conducted during the 2015 and 2016 summer field programs are summarized under the heading “Arctic Project – Current Activities”.

### Arctic Project - Mineralization

In 2013, we updated the mineralization models, representing massive and semi-massive VMS-style mineralization. Geometrically, the mineralization is confined to six lenticular mineralized zones concentrated along an isoclinal fold hinge. Five of the six SMS zones contain a core of MS material. For more details regarding length, width, depth and continuity together with a description of the type, character and distribution of the mineralization see “*Local/Property Geology”* above.

Arctic Project - Drilling

Drilling at the Arctic Deposit has been ongoing since its initial discovery in 1965. Approximately 31,907 m of drilling in 135 drill holes have been completed at the deposit or on potential extensions in 23 campaigns spanning 45 years. All of the drill campaigns between 1965 and 2012 have been run under the auspices of either: 1) Kennecott and its subsidiaries, or 2) NovaGold, our predecessor company.

We and our predecessor company NovaGold, have drilled 17,983 m in 59 different drill holes targeting the Arctic Deposit and several other prospects of the Ambler Schist belt. Table 3 summarizes all of the Trilogy/NovaGold tenure drilling on the property. Drilling conducted during the 2015 and 2016 summer field programs are summarized under the heading “*Arctic Project – Current Activities”.*

Table 3: Summary of Trilogy/NovaGold Drilling (2004 – 2012)

| Year | Meters | No. of Drill Holes | Sequence | Purpose of Drilling |
| --- | ---: | ---: | --- | --- |
| 2004 | 2,996 | 11 | AR04-78 to 88 | Deposit scoping and verification |
| 2005 | 3,030 | 9 | AR05-89 to 97 | Extensions to the Arctic Deposit |
| 2006\*\*\* | 3,100 | 12 | AR06-98 to 109 | Property-wide exploration drilling |
| 2007 | 2,606 | 4 | AR07-110 to 113 | Deep extensions of the Arctic Deposit |
| 2008\* | 3,306 | 14 | AR08-114 to 126 | Grade continuity and metallurgy |
| 2011\*\* | 1,193 | 5 | AR11-127 to 131 | Geotechnical studies |
| 2012\*\*\* | 1,752 | 4 | SC12-014 to 017 | Exploration drilling – Sunshine |

Notes: \*A total of 12 of the 14 holes drilled in 2008 were utilized in the 2012 SRK resource update. Two holes were maintained in sealed frozen storage to provide additional metallurgical samples if required.

\*\* Geotechnical holes drilled in 2011 are not included in the current resource estimation contained herein.

\*\*\* Drilling in 2006 and 2012 targeted exploration targets elsewhere in the VMS belt.

Over the Arctic Project’s history, a relatively limited number of drill companies have been used by Kennecott and Trilogy/NovaGold at the Arctic Deposit. During Kennecott’s tenure on the property, Sprague and Henwood, a Pennsylvania-based drilling company was the principal contractor. Sprague and Henwood utilized company manufactured drill rigs during their tenure on the property. Many of their rigs remain at the Bornite Deposit and constitute a historical inventory of 1950s and 1960s exploration artifacts. Tonto Drilling provided services to Kennecott during Kennecott’s short return to the district in the late 1990s. We and NovaGold have utilized Boart Longyear as our only contractor. The 2004 to 2012 Trilogy/NovaGold drill programs used a single skid-mounted LF-70 core rig, drilling HQ or NQ core. Wireframes were updated in 2013 to incorporate interpretation of all drill results to date and have been included in the resource estimate.

Arctic Project - Sampling Methodology and Analysis

The data for the Arctic Deposit resource was generated over three primary drilling campaigns: 1966 to 1986 when BCMC, a subsidiary of Kennecott Copper Corporation was the primary operator, 1998 when Kennecott Minerals resumed work after a long hiatus, and 2004 to 2012 with NovaGold and now us as the operators.

Sampling of drill core prior to 1998 by BCMC focused primarily on the mineralized zones; numerous intervals of weak to moderate mineralization were not sampled during this period. During the 1998 campaign, Kennecott did sample some broad zones of alteration and weak mineralization, but much of the unaltered and unmineralized drill core was left unsampled. Little documentation on historic sampling procedures is available.

Between 2004 and 2006, NovaGold conducted a systematic drill core re-logging and re-sampling campaign of Kennecott and BCMC era drill holes AR-09 to AR-74. NovaGold either took 1 to 2 m samples every 10 m, or sampled entire lengths of previously unsampled core within a minimum of 1 m and a maximum of 3 m intervals. The objective of the sampling was to generate a full ICP geochemistry dataset for the Arctic Deposit and ensure continuous sampling throughout the deposit. Sample preparation procedures for NovaGold era work are described below.

All drill core was transported by helicopter in secure core “baskets” to either the Dahl Creek camp or the Bornite camp for logging and sampling. Sample intervals were determined by the geologist during the geological logging process. Sample intervals were labelled with white paper tags and butter (aluminum) tags which were stapled to the core box. Each tag had a unique number which corresponded to that sample interval. Sample intervals were determined by the geological relationships observed in the core and limited to a three meter maximum length and one meter minimum length. An attempt was made to terminate sample intervals at lithological and mineralization boundaries. Sampling was generally continuous from the top to the bottom of the drill hole. When the hole was in unmineralized rock, the sample length was generally three meters, whereas in mineralized units, the sample length was shortened to one to two meters. Geological and geotechnical parameters were recorded based on defined sample intervals and/or drill run intervals (defined by the placement of a wooden block at the end of a core run). Logged parameters were reviewed annually and slight modifications have been made between campaigns, but generally include rock type, mineral abundance, major structures, specific gravity (“SG”), point load testing, recovery and rock quality designation measurements. Drill logs were converted to a digital format and forwarded to the Database Manager, who imported them into the master database. Core was photographed and then brought into the saw shack where it was split in half by the rock saw, divided into sample intervals, and bagged by the core cutters. Not all drill core was oriented; however, core that had been oriented was identified to samplers by a line drawn down the core stick. If core was not competent, it was split by using a spoon to transfer half of the core into the sample bag. Once the core was sawed, half was sent to ALS Chemex Laboratories (“ALS Chemex”) in Vancouver for analysis and the other half was stored at the Dahl Creek camp, but since has been consolidated at the storage facility at the Bornite camp facilities or at our warehouse in Fairbanks. Shipment of core samples from the Dahl Creek camp occurred on a drill hole by drill hole basis. Rice bags, containing two to four poly-bagged core samples each, were marked and labelled with the ALS Chemex address, project and hole number, bag number, and sample numbers enclosed. Rice bags were secured with a pre-numbered plastic security tie and a twist wire tie and then assembled into sling loads for transport by chartered flights on a commercial airline to Fairbanks, where they were met by a contracted expeditor for delivery directly to the ALS Minerals preparation facility in Fairbanks. In addition to the core, control samples were inserted into the shipments at the approximate rate of one standard, one blank and one duplicate per 20 core samples:

- Standards: four standards were used at the Arctic Deposit. The core cutter inserted a sachet of the appropriate standard, as well as the sample tag, into the sample bag.
- Blanks: were composed of an unmineralized landscape aggregate. The core cutter inserted about 150 g of blank, as well as the sample tag, into the sample bag.
- Duplicates: the assay laboratory split the sample and ran both splits. The core cutter inserted a sample tag into an empty sample bag.

Samples were logged into a tracking system on arrival at ALS Chemex, and weighed. Samples were then crushed, dried, and a 250 g split pulverized to greater than 85% passing 75 μm.

Gold assays were determined using fire analysis followed by an atomic absorption spectroscopy finish. The lower detection limit was 0.005 ppm gold; the upper limit was 1,000 ppm gold. An additional 34-element suite was assayed by inductively coupled plasma-atomic emission spectroscopy (“ICP-AES”) methodology, following nitric acid aqua regia digestion. The copper analyses were completed by atomic absorption (“AA”), following a triple acid digest.

The accreditations of Primary and Secondary assay laboratories used during the 1966 – 1986 campaigns are not known. ALS Analytical Lab (Fairbanks, Alaska) was the Primary assay lab between 1998 – present. ALS Chemex has attained International Organization for Standardization (“ISO”) 9001:2000 registration. In addition, the ALS Chemex laboratory in Vancouver is accredited to ISO 17025 by Standards Council of Canada for a number of specific test procedures including fire assay of gold by AA, ICP and gravimetric finish, multi-element ICP and AA assays for silver, copper, lead and zinc. Trilogy has no relationship with any assay labs.

During 2013, we conducted a 26% audit of the NovaGold era assay database fields: sample interval, Au, Ag, Cu, Zn, and Pb. This audit is documented in a series of memos. Our staff did not identify and/or correct any transcription and/or coding errors in the database prior to resource estimation. We also retained independent consultant Caroline Vallat, P.Geo. of GeoSpark Consulting Inc. to: 1) re-load 100% of the historical assay certificates, 2) conduct a QA/QC review of paired historical assays and NovaGold era re-assays; 3) monitor an independent check assay program for the 2004 to 2008 and 2011 drill campaigns; and 4) generate QA/QC reports for the 2004 to 2008 and 2011 drill campaigns.

### Arctic – Security of Samples

Security measures taken during historical Kennecott and BCMC programs are unknown to NovaGold or us. We are not aware of any reason to suspect that any of these samples have been tampered with. The 2004 to 2011 samples were either in the custody of NovaGold personnel, contractors or the assay laboratories at all times as discussed above, and the chain of custody of the samples is well documented.

Arctic Project - Mineral Resource Estimate

The mineral resource estimate was prepared by Tetra Tech with an effective date of the resource estimate as of July 30, 2013. Mineral Resources are classified in accordance with the 2010 CIM Definition Standards for Mineral Resources and Mineral Reserves.

The mineral resource model prepared by Tetra Tech considers diamond drill holes drilled by different operators during the period 1965 to 2011. The majority of the assaying has been completed in recent years by us and our previous parent company NovaGold. The mineral resource for the Arctic Project is supported by 43 core holes (approximately 13,500 m) drilled by NovaGold and 92 core holes (approximately 17,600 m) drilled by previous owners Kennecott, and/or a Kennecott subsidiary. The geological and assay database used to estimate the Arctic Project mineral resources have been reviewed and audited by Tetra Tech.

Leapfrog™ software (version 2.5.1) was used to review and verify the resource estimation domains, prior to being imported into Isatis™ software (version 2012.1) to prepare assay data for geostatistical analysis, variography, block model construction, metal grade estimation and mineral resource tabulation. Mineral Resources were estimated into five MS and six SMS lenses, and then combined for an overall grade for the mineralized portion of the 10 m by 10 m by 5 m block. Extreme lead and gold assays were capped prior to compositing. Ordinary kriging and inverse distance squared estimates were run, with ordinary kriging used for resource reporting and inverse distance squared used for validation. Search parameters were constrained within each mineralized domain and required an optimum number of 15 composites, minimum number of 5 composites, minimum number of 2 drill holes, and maximum search distance range of 200 m. In general, blocks categorized as Indicated were supported by at least two drill holes within a 75 m search radii, and blocks categorized as Inferred were supported by at least 2 drill holes within a 150 m search radii. Estimated resources for the Arctic Deposit are reported in the following Table 4 and Table 5.

The Arctic Project has no known reserves.

The PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the estimates contained in the PEA will ever be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

### Table 4 Indicated Resource Estimate for the Arctic Project (NSR Cut-off of $35/t)

*Cautionary Note to United States Investors concerning estimates of Indicated Resources.* This section uses the term “indicated resources”. We advise United States investors that these terms are not recognized by the SEC. United States investors are cautioned not to assume that estimates of indicated mineral resources are economically minable, or will be upgraded into measured mineral resources. See “*Risk Factors”* and “*Cautionary Note to United States Investors.”*

| Category | Mt | Cu (%) | Zn (%) | Pb (%) | Au (g/t) | Ag (g/t) | Cu (Mlb) | Zn (Mlb) | Pb (Mlb) | Au (Moz) | Ag (Moz) |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Indicated | 23.848 | 3.26 | 4.45 | 0.76 | 0.71 | 53.2 | 1,713 | 2,338 | 400.9 | 0.55 | 40.8 |

Notes: 1. These resource estimates have been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards. Mineral resources that are not mineral reserves do not have demonstrated economic viability. *See “Risk Factors” and “Cautionary Note to United States Investors.”*

2\. Mineral Resources are reported within mineralization wireframes, contained within an Indicated pit design using an assumed copper price of $2.90/lb, zinc price of $0.85/lb, lead price of $0.90/lb, silver price of $22.70/oz, and gold price of $1,300/oz.

3\. Appropriate mining costs, processing costs, metal recoveries and inter ramp pit slope angles were used to generate the pit design.

4\. The $35.01/t milled cut-off is calculated based on a process operating cost of $19.03/t, G&A of $7.22/t and site services of $8.76/t. NSR equals payable metal values, based on the metal prices outlined in Note 2 above, less applicable treatment, smelting, refining costs, penalties, concentrate transportation costs, insurance and losses and royalties.

5\. The LOM strip ratio was estimated at 8.39.

6\. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content.

7\. Tonnage and grade measurements are in metric units. Contained copper, zinc and lead pounds are reported as imperial pounds, contained silver and gold ounces as troy ounces.

### Table 5 Inferred Resource Estimate for the Arctic Project (NSR Cut-off of $35/t)

*Cautionary Note to United States Investors concerning estimates of Inferred Resources.* This section uses the term “inferred resources”. We advise United States investors that these terms are not recognized by the SEC. The estimation of inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources. United States investors are cautioned not to assume that estimates of inferred mineral resources exist, are economically minable, or will be upgraded into measured or indicated mineral resources. See “*Risk Factors”* and “*Cautionary Note to United States Investors.”*

| Category | Mt | Cu (%) | Zn (%) | Pb (%) | Au (g/t) | Ag (g/t) | Cu (Mlb) | Zn (Mlb) | Pb (Mlb) | Au (Moz) | Ag (Moz) |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Inferred | 3.363 | 3.22 | 3.84 | 0.58 | 0.59 | 41.5 | 239 | 285 | 43.2 | 0.06 | 4.5 |

|  |  |  |
| --- | --- | --- |
| Notes: | 1. | These resource estimates have been prepared in accordance with NI 43-101 and the CIM Definition Standards. See “Risk Factors” and “Cautionary Note to United States Investors.” |
|  | 2. | Mineral Resources are reported within mineralization wireframes, contained within an Inferred pit design using an assumed copper price of $2.90/lb, zinc price of $0.85/lb, lead price of $0.90/lb, silver price of $22.70/oz, and gold price of $1,300/oz. |
|  | 3. | Appropriate mining costs, processing costs, metal recoveries and inter ramp pit slope angles were used to generate the pit design. |
|  | 4. | The $35.01/t milled cut-off is calculated based on a process operating cost of $19.03/t, G&A of $7.22/t and site services of $8.76/t. NSR equals payable metal values, based on the metal prices outlined in Note 2 above, less applicable treatment, smelting, refining costs, penalties, concentrate transportation costs, insurance and losses and royalties. |
|  | 5. | The LOM strip ratio was estimated at 8.39. |
|  | 6. | Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content. |
|  | 7. | Tonnage and grade measurements are in metric units. Contained copper, zinc and lead pounds are reported as imperial pounds, contained silver and gold ounces as troy ounces. |

Arctic Project – Mining Operations

The Arctic Project is not currently in production; for contemplated exploration or development activities see below.

Arctic Project – Exploration and Development

As noted in the summary *Arctic Project – Technical Report* above, we engaged Tetra Tech to prepare a PEA for the Arctic Project. The following summary describes the main results and assumptions of the PEA not previously discussed above. See “*Arctic Project – Current Activities”* below for a description of the Company’s current and contemplated exploration.

The PEA is based on a conventional truck-and-shovel, open-pit mine design at a single pit. The mining schedule was developed based on a maximum mill capacity of 10,000 t/d. The Arctic Project’s total mine life is 13 years, including 1 year of pre-stripping followed by 12 years of production. The pit uses four pushbacks and a minimum mining width of 40 m. Over the 13-year life, the pit is producing 35.7 Mt of mineralized material and 299.4 Mt of waste rock. The life-of-mine (“LOM”) stripping ratio is 8.39 and the stripping ratio excluding the pre-stripping waste rock is 7.94. The mining schedule does not currently consider a low-grade stockpiling option but this can be assessed in more detail in future studies.

#### Mineral Processing and Metallurgical Testing

Since 1970, metallurgical test work has been conducted to determine the flotation response of various samples extracted from the Arctic Deposit. In general, the samples tested produced similar metallurgical performances. In 2012, SGS Mineral Services (“SGS”) conducted a metallurgical test program to further study metallurgical responses of the samples produced from Zones 1, 2, 3, and 5 of the Arctic Deposit. The flotation test procedures used talc pre-flotation, conventional copper-lead bulk flotation and zinc flotation, followed by copper and lead separation. In general, the 2012 test results indicated that the samples responded well to the flowsheet tested. Below is a summary of average results of the locked cycle tests (without copper and lead separation).

- The copper recoveries to the bulk copper-lead concentrates ranged from 89 to 93% excluding the Zone 1 & 2 composite which produced a copper recovery of approximately 84%; the copper grades of the bulk concentrates were 24 to 28%.
- Approximately 92 to 94% of the lead was recovered to the bulk copper-lead concentrates containing 9 to 13% lead.
- The zinc recovery was 84.2% from Composite Zone 1 & 2, 93.0% from Composite Zone 3 and 90.5% from Composite Zone 5. On average, the zinc grades of the concentrates produced were higher than 55%, excluding the concentrate generated from Composite Zone 1 & 2, which contained only 44.5% zinc.
- Gold and silver were predominantly recovered into the bulk copper-lead concentrates. Gold recoveries to this concentrate ranged from 65 to 80%, and silver recoveries ranged from 80 to 86%.

Using an open circuit procedure, the copper and lead separation tests on the bulk copper-lead concentrate produced from the locked cycle tests generated reasonable copper and lead separation. The copper concentrates produced contained approximately 28 to 31% copper, while the grades of the lead concentrates were in the range of 41% to 67% lead. Also, it appears that most of the gold reported to the copper concentrate and on average the silver was equally recovered into the copper and lead concentrates.

The 2012 grindability test results showed that the Bond ball millwork index tests ranged from 6.5 to 11 kWh/t and abrasion index tests fluctuated from 0.017 to 0.072 g for the mineralized samples. The data indicates that the samples are neither resistant nor abrasive to ball mill grinding. The materials are considered to be soft or very soft in terms of grinding requirements.

#### Recovery Methods

A 10,000 t/d process plant has been designed to process the massive and semi-massive sulphide mineralization of the Arctic property. The main economic elements found in the deposit are copper, zinc, lead, and associated gold and silver. The process plant will operate two twelve hour shifts per day, 365 days per year with an overall plant availability of 92%. The process plant will produce three concentrates: 1) copper concentrate, 2) zinc concentrate, and 3) lead concentrate. Gold and silver are expected to be payable at a smelter and are recovered in both the copper and lead concentrates. The process plant feed will be supplied from the Arctic open pit mine.

The mill feed will be hauled from the open pit to a primary crushing facility where the material will be crushed by a jaw crusher to a particle size of 80% passing 125 mm.

The crushed material will be ground by two stages of grinding, consisting of one SAG mill and one ball mill in closed circuit with hydrocyclones (SAB circuit). The hydrocyclone overflow with a grind size of approximately 80% passing 70 µm will first undergo pre-talc flotation, and then be processed by conventional bulk flotation (to recover copper, lead, and associated gold and silver), followed by zinc flotation. The rougher bulk concentrate will be cleaned and followed by copper and lead separation to produce a lead concentrate and a copper concentrate. The final tailings from the zinc flotation circuit will be pumped to the TSF. Copper, lead, and zinc concentrates will be thickened and pressure-filtered before being transported by truck to a port and shipped to smelters.

The LOM average mill feed is expected to contain 2.28% copper, 0.53% lead, 3.13% zinc, 0.5 g/t gold, and 37 g/t silver. According to the mine plan developed for the PEA study and metallurgical test results, the LOM average metal recoveries and concentrate grades are projected below:

- copper concentrate recovery: 87.1% copper; 57.9% gold; 40.2% silver; copper grade: 29%
- lead concentrate recovery: 74.0% lead; 6.8% gold; 40.2% silver; lead grade: 50%
- zinc concentrate recovery: 86.8% zinc; zinc grade: 56%.

#### Tailings and Storage Facility

The co-disposal TSF will be a fully lined facility consisting of rockfill embankment constructed across the Sub-Arctic Creek drainage, creating an impoundment that will extend up the drainage. The rockfill embankment will be constructed to an ultimate crest elevation of 655 masl with the embankment being raised in stages to minimize the initial capital construction cost. During operations, potential acid generating (“PAG”) waste rock will be placed at the bottom and sides of the basin forming layers with consecutive disposal on tailings that will be filling the voids. The tailings has the potential to generate acid and, therefore, the tailings and the PAG waste rock will be placed under water and remain permanently submerged in order to reduce the potential for acid generation. Additional studies will be required to determine the most suitable method of co-disposal and potential requirements for acid rock drainage (“ARD”) management and mitigation programs will need to be part of the design of the TSF.

The TSF will be required to contain 110.5 Mm3 total over the 12-year LOM, with 23.8 Mm3 to accommodate the tailings at an assumed stored dry density of 1.5 t/m3 and 86.7 Mm3 of PAG waste rock at an assumed stored dry density of 1.9 t/m3. The TSF will be sited as a staged rockfill embankment with an upstream geomembrane liner. The starter embankment will have a crest elevation of 560 m and impound 1 year of mining production, which is approximately 670,000 m3 of tailings and 12.3 Mm3 of waste rock.

Arctic Project - Environmental Considerations

Environmental baseline data collection was initiated in 2007, including surface water quality sampling, wetlands mapping, stream flow monitoring, aquatic life surveys, subsistence, meteorological monitoring, and acid base accounting sampling. Additional baseline environmental data in the Ambler Lowlands, the Subarctic Creek drainage, the Shungnak River drainage and downstream receiving environments will be required to support future mine design, development of an environmental impact statement, permitting, construction and operations.

The Arctic Project has the potential to significantly improve work opportunities for local and regional residents. In October 2011, we signed an agreement with NANA which in addition to consolidating landholdings in the Ambler district has language establishing native hiring preferences and preferential use of NANA subsidiaries for contract work. Furthermore, the agreement formalized an Oversight Committee, with equal representation from NANA and us, to regularly review project plans and activities. In addition, a Subsistence Subcommittee has been formed to protect subsistence and the Iñupiaq way of life and a Workforce Development Subcommittee is also in place to address current and future employment needs. We meet monthly, during summer months, with the residents of Kobuk, Shungnak and Ambler, the three villages closest to the project area. We also meet annually with eight other NANA region villages including Noatak, Kivalina, Kotzebue, Kiana, Deering, Buckland, Selawik and Noorvik, for the purpose of updating residents on project plans and fielding their questions and concerns. We have also developed a good working relationship with the NWAB government.

The Arctic Project will be subject to a mine permitting process which will include compliance with the *National Environmental Policy Act* and will require a number of major mine permits from state and federal agencies as well as a significant number of minor permits. Although a number of federal conservation units are located in the general vicinity of the Arctic Project, including but not limited to the Gates of the Arctic National Parks, Kobuk Preserve, Selawik National Wildlife Refuge, and Kobuk Valley and Selawik Wilderness areas, there presence does not change the permitting process nor add to the number of permits required for the Arctic Project.

We will be required to develop a formal project description and detailed reclamation and closure plan to support a successful permit application strategy. The mine plan will embrace the concept of “design for closure”. In order to reduce any lasting risk of environmental impacts, the plan will minimize surface disturbances during operations and promote long-term stability of the site after closure.

No assurance can be given that new laws and regulations will not be enacted or that existing laws and regulations will not be applied in a manner that could limit or curtail the Arctic Project. Amendments to current laws, regulations, licenses and permits governing operations and activities of mining companies, or more stringent implementation thereof, could have a material adverse impact on the Arctic Project and cause increases in capital expenditures or production costs, or reduction in levels of production, or abandonment, or delays in the development of the business.

Arctic Project - Current Activities

The focus of work on the Arctic Project in 2015 was drilling, surficial field investigations and desktop studies to support pre-feasibility. Trilogy completed fourteen diamond drill holes for a total of 3,056 m of core; including twelve in-fill drill holes, representing 2,425 m, designed to evaluate vertical and lateral continuity of the high-grade polymetallic copper, gold, silver, lead and zinc mineralization, and support upgrading of inferred resources to measured and indicated resource classification within the area of the proposed Arctic open-pit as outlined in the PEA, and two drill holes, representing 631 m, specifically targeting geotechnical and hydrogeological information. Based on a cut-off grade of 1.0% copper all fourteen drill holes intersected significant intervals; defined as a minimum of 1.0 meter copper interval with average grade \>0.7% copper.

The 2015 drill program, sampling protocol and data verification were managed and overseen by qualified persons employed by Trilogy. The twelve in-fill diamond drill holes were drilled at NQ diameter drill core and the two geotechnical drill holes were drilled at HQ diameter drill core by Boart Longyear of South Jordan, Utah. Samples in mineralized core were collected using a 0.3-meter minimum length, 2.0-meter maximum length and 0.9-meter average sample length. Samples in un-mineralized core were collected using 2.0-meter minimum length, 10-meter maximum length and 4-meter average sample length. Drill core recovery averaged 94% without overburden. Three quality control samples (one blank, one standard and one duplicate) were inserted into each batch of 20 samples. The drill core was either sawn or shipped as whole core, with samples sent to ALS Minerals, Fairbanks, Alaska for sample preparation and the sample pulps forwarded to ALS’s North Vancouver facility for analysis. ALS Minerals in North Vancouver, B.C., Canada, is a facility certified as ISO 9001:2008 and accredited to ISO / IEC 17025:2005 from the Standards Council of Canada.

In addition to the drill program, Trilogy contracted SRK Consulting of Vancouver, Canada (SRK) to conduct a dedicated field investigation comprised of drill logging, mapping, laboratory test work and downhole installations. A summary report detailing a gap analysis, desktop study findings and field investigation recommendations was issued prior to the drill program. Two dual purpose drill holes were completed for geotechnical (soil and rock) and hydrogeological data acquisition. Additionally, SRK hydrogeologists re-visited previously installed vibrating wire piezometers to ensure data loggers were operational and to download pore pressure measurement data. A civil geotechnical site visit was conducted to investigate surface conditions and provide comment on potential infrastructure and waste management facilities layout. Furthermore, structural mapping of exposed rock faces along the Arctic ridge along with downhole televiewer and structural logging of newly acquired drill core were consolidated with prior work to support a 3D structural model.

Under the guidance of SRK, Trilogy initiated acid-base-accounting kinetic test work at Arctic in 2015; both on-site barrel testing and parallel laboratory humidity cells. In addition, Trilogy collected samples from the 2015 drill program to increase static testing coverage over the Arctic deposit.

Environmental baseline data collection continued in 2015, including 34,000 acres of wetlands delineation within the project area, which was completed by WHPacific of Anchorage, Alaska. Seventy percent of a LiDAR survey over the UKMP was completed by WHPacific and Quantum Spatial before weather conditions became unfavorable.

Site investigation activities continued at the UKMP Projects in 2016 and were mainly focused on advancing the Arctic project towards pre-feasibility. We completed thirteen diamond drill holes for a total of 3,058 meters of core. The 2016 drill program was designed to collect data for geotechnical, hydrological, waste rock characterization and metallurgical studies as well as further resource definition.

Three drill holes representing 822 meters drilled were designed to collect geotechnical and hydrological data within the proposed Arctic open-pit. Data collected from the geotechnical/hydrological drill program and outcrop/seeps mapping was used to update a 3D structure model, rock mass model, and hydrogeology model and these results have been integrated into a combined geotechnical model that will be used for characterization of geotechnical domains and slope stability evaluation in a future pre-feasibility study.

Four drill holes representing 1,030 meters drilled were designed to collect metallurgical samples, specifically targeting material within the initial production years of the Arctic open-pit. A metallurgical test work program is currently underway and expected to be complete in Q1-2017.

Six drill holes representing 1,206 meters drilled were designed to evaluate vertical and lateral continuity of the high grade polymetallic copper, gold, silver, lead, and zinc mineralization, and support upgrading of Inferred resources to Measured and Indicated resource classification within the area of the proposed Arctic open-pit. We are pleased to announce that all six infill holes encountered mineralized intervals consistent with previous drilling conducted within the resource area on the property. Data collected from the drill program was used to update the 3D geology model. The updated geology domains and drill data will be incorporated into an updated resource estimate that will support a future pre-feasibility study.

The drill program, sampling protocol and data verification were managed and overseen by qualified persons employed by Trilogy Metals. Thirteen diamond drill holes were drilled at HQ and NQ diameter drill core by Boart Longyear of South Jordan, Utah. Samples in mineralized core were collected using a 0.2-meter minimum length, 5.0-meter maximum length and 1.4-meter average sample length. Samples in un-mineralized core were collected using 0.2-meter minimum length, 5.0-meter maximum length and 3.2-meter average sample length. Drill core recovery averaged 94% with overburden. Three quality control samples (one blank, one standard and one duplicate) were inserted into each batch of 20 samples. The drill core was either sawn or shipped as whole core, with samples sent to ALS Minerals, Fairbanks, Alaska for sample preparation and the sample pulps forwarded to ALS's North Vancouver facility for analysis. ALS Minerals in North Vancouver, B.C., Canada, is a facility certified as ISO 9001:2008 and accredited to ISO / IEC 17025:2005 from the Standards Council of Canada.

In addition to the drill program, we conducted an aquatics survey, avian survey, habitat survey, archaeological survey, and wetlands delineation survey, and continued ongoing baseline environmental data collection in 2016.

An aquatics survey of rivers and creeks over the UKMP Projects included identification of fish species present and tissues metals testing. An avian survey over the UKMP Projects was conducted in May to identify bird nest locations, with a follow-up survey in July to measure fledging success. A habitat survey was completed in conjunction with the wetlands survey and will be used to inform future biological surveys. Approximately 2,400 acres were surveyed for archaeological resources in or around the potential Arctic open-pit and facilities locations. Approximately 2,900 acres of wetlands were delineated using techniques approved by the Army Corps of Engineers.

On-going baseline environmental data collection included maintenance of three hydrologic gauging stations and one meteorological station. Surface water quality samples were taken from sixteen surface water locations and analyzed for a full suite of parameters including total and dissolved metals.

We continue to advance the acid-base-accounting static and kinetic test work at Arctic. Continuous down-hole samples were collected from the 2016 drill program to support static testing coverage over the Arctic deposit. On-site barrel sampling was successfully completed in the spring and fall of 2016 to support the kinetics program, and in August we achieved the 40-week milestone for the parallel laboratory humidity cells; maintenance and monitoring of all kinetic tests will continue into 2017.

The LiDAR survey that was incomplete last year due to weather conditions was also completed during the summer. Final deliverables received in the fall of 2016 are being utilized to support on-going engineering design and geological modeling.

Bornite Project, Ambler District, Alaska

Bornite Project

Except for the information under the heading “*Bornite Project – Current Activities”* and except as otherwise stated, the scientific and technical information relating to the Bornite Project contained in this Form 10-K is derived from, and in some instances is an extract from, the technical report titled “NI 43-101 Technical Report on the Bornite Project, Northwest Alaska, USA” report dated effective April 19, 2016 released May 16, 2016 (the “Bornite Report”) prepared by BD Resource Consulting, Inc., SIM Geological Inc., and International Metallurgical & Environmental Inc. Erin Workman, P.Geo., an employee and Director, Technical Services, is a Qualified Person as defined in NI 43-101, and has approved the scientific and technical information contained herein. The information regarding the Bornite Project is based on assumptions, qualifications and procedures which are not fully described herein. Reference should be made to the full text of the Bornite Report which has been filed with certain Canadian securities regulatory authorities pursuant to NI 43-101 and is available for review on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

Bornite Project - Property Description and Location

The property is located in the Ambler mining district of the southern Brooks Range, in the NWAB of Alaska. The property is located in Ambler River A-2 quadrangle, Kateel River Meridian T 19N, R 9E, sections 4, 5, 8 and 9. The Bornite Project is located 248 km east of the town of Kotzebue, 19 km north of the village of Kobuk, 275 km west of the Dalton Highway, an all-weather state maintained public road, at geographic coordinates N67.07° latitude and W156.94° longitude (Universal Transverse Mercator (UTM) North American Datum (NAD) 83, Zone 4W coordinates 7440449N, 589811E).

Bornite Project - Accessibility, Climate, Local Resources, Infrastructure, and Physiography

Primary access to the Bornite Project is by air, using both fixed wing aircraft and helicopters. There are four well maintained, approximately 1,500 m-long gravel airstrips located near the property, capable of accommodating charter fixed wing aircraft. These airstrips are located 40 km west at Ambler, 23 km southwest at Shungnak, 19 km south at Kobuk, and 15 km south at Dahl Creek. There is daily commercial air service from Kotzebue to the village of Kobuk, the closest community to the property. During the summer months, the Dahl Creek Camp airstrip is suitable for larger aircraft, such as C-130 and DC-6. In addition to the four 1,500 m airstrips, there is a 700 m airstrip located at the Bornite Camp. The airstrip at Bornite is suited to smaller aircraft, which support the Bornite Camp with personnel and supplies.

There is no direct water access to the property. During spring runoff, river access is possible by barge from Kotzebue Sound to Ambler, Shungnak, and Kobuk via the Kobuk River.

A two-lane, two-wheel drive gravel road links the Bornite Project’s main camp to the 1,525 m Dahl Creek airstrip and village of Kobuk.

The climate in the region is typical of a sub-arctic environment. Exploration is generally conducted from late May until late September. Weather conditions on the Bornite Project can vary significantly from year to year and can change suddenly. During the summer exploration season, average maximum temperatures range from 10°C to 20°C, while average lows range from -2°C to 7°C. By early October, unpredictable weather limits safe helicopter travel to the property. During winter months, the property can be accessed by snow machine, track vehicle, or fixed wing aircraft. Winter temperatures are routinely below -25°C and can exceed -50°C. Annual precipitation in the region averages at 395 mm with the most rainfall occurring from June through September, and the most snowfall occurring from November through January.

Drilling and mapping programs are seasonal and have been supported out of the Main Bornite Camp and Dahl Creek Camp. The main Bornite Camp facilities are located on Ruby Creek on the northern edge of the Cosmos Hills. The camp provides office space and accommodations for the geologists, drillers, pilots, and support staff. There are four 2-person cabins installed by NANA prior to our tenure. In 2011, the main Bornite Camp was expanded to 20 sleeping tents, 3 administrative tents, 2 shower/bathroom tents, 1 medical tent, and 1 dining/cooking tent. With these additions, the camp capacity was increased to 49 beds. A 30 m by 9 m core logging facility was also built in summer of 2011. An incinerator was installed near the Bornite airstrip to manage waste created by the Bornite Project. Power for the Bornite Project is supplied by a 175 kW Caterpillar diesel generator. Water is provided by a permitted artesian well located 250 m from the Bornite Camp. In 2012, the camp was further expanded with the addition of a laundry tent, a women's shower/washroom tent, a recreation tent, several additional sleeping tents, and a 2 x enlargement of the kitchen tent. Camp capacity increased to 76 beds. The septic field was upgraded to accommodate the increase in camp population. One of the two-person cabins was winterized for use by the winter caretaker. A permitted landfill was established to allow for the continued cleanup and rehabilitation of the historic shop facilities and surroundings. The Dahl Creek camp is a leased facility used as an overflow or alternative facility to the main Bornite Camp. The Dahl Creek camp has a main cabin for dining and administrative duties, and a shower facility. Sleeping facilities include two hard-sided sleeping cabins with seven beds (primarily used for staff), one 4-person sleeping tent, and three 2-person sleeping tents for a total of 17 beds. There are support structures, including a shop and storage facilities.

The Bornite Project is located on Ruby Creek on the northern edge of the Cosmos Hills. The Cosmos Hills are part of the southern flank of the Brooks Range in Northwest Alaska. Topography in the area is moderately rugged. Maximum relief in the Cosmos Hills is approximately 1,000 masl with an average of 600 masl. Talus covers the upper portions of the hills; glacial and fluvial sediments occupy valleys. The Kobuk Valley is located at the transition between boreal forest and Arctic tundra. Spruce, birch, and poplar are found in portions of the valley, with a ground cover of lichens (reindeer moss). Willow and alder thickets and isolated cottonwoods follow drainages, and alpine tundra is found at higher elevations. Tussock tundra and low, heath-type vegetation covers most of the valley floor. Patches of permafrost exist on the property. Wildlife in the property area is typical of Arctic and Subarctic fauna. Larger animals include caribou, moose, Dall sheep, bears (grizzly and black), wolves, wolverines, coyotes, and foxes. Fish species include salmon, sheefish, arctic char, and arctic grayling. The Kobuk River, which briefly enters the Upper Kobuk Mineral Projects on its southwest corner, is a significant salmon spawning river. The caribou on the property belong to the Western Arctic herd that migrates twice a year – south in August, from their summer range north of the Brooks Range, and north in March from their winter range along the Buckland River.

Bornite Project - History

Kennecott and Bear Creek Mining Tenure

Regional exploration began in the early 1900s when gold prospectors noted copper occurrences in the hills north of Kobuk, Alaska. In 1947, local prospector Rhinehart “Rhiny” Berg along with various partners traversing in the area located outcropping mineralization along Ruby Creek (Bornite) on the north side of the Cosmos Hills. They subsequently staked claims over the Ruby Creek showings and constructed an airstrip for access. In 1957, BCMC, Kennecott's exploration subsidiary, optioned the property from Berg. Exploration drilling in 1961 and 1962 culminated in the discovery of the “No.1 Ore Body” where drill hole RC-34 cut 20 m of 24% copper (the “No.1 Ore Body” is a historic term used by BCMC that does not connote economic viability in the present context; it is convenient to continue to use the term to describe exploration work and historic resource estimation in a specific area of what is now generally known as Ruby Creek Upper Reef). The discovery of the “No.1 Ore Body” led to the development of an exploration shaft in 1966. The shaft, which reached a depth of 328 m, encountered a significant watercourse and was flooded near completion depth. The shaft was subsequently dewatered and an exploration drift was developed to provide access for sampling and mapping, and to accommodate underground drilling to further delineate mineralization. A total of 59 underground holes were drilled and, after the program, the shaft was allowed to re-flood. The discovery of the Arctic Project in 1965 prompted a hiatus in exploration at Bornite, and only limited drilling occurred up until 1976.

In the late 1990s, Kennecott resumed its evaluation of the Bornite deposit and the mineralization in the Cosmos Hills with an intensive soil, stream, and rock chip geochemical sampling program using 32 element ICP analyses. Grid soil sampling yielded 765 samples. Ridge and spur sampling resulted in an additional 850 soil samples in the following year. Skeletonized core samples (85 samples) from key historic drill holes were also analyzed using 32 element ICP analytical methods. Geochemical sampling identified multiple areas of elevated copper and zinc in the Bornite region.

Kennecott completed numerous geophysical surveys as an integral part of exploration throughout their tenure on the property. Various reports, notes, figures, and data files stored in Kennecott’s Salt Lake City exploration office indicated that geophysical work included, but was not limited to, the following:

- Airborne magnetic and EM surveys (fixed-wing INPUT) (1950s)
- Gravity, single point (“SP”), Audio-Frequency Magneto-Telluric (“AMT”), EM, borehole and surface IP/resistivity surveys (1960s)
- Gravity, airborne magnetic, and CSAMT surveys (1990s)

We have little information or documentation associated with these geophysical surveys conducted prior to the 1990s. Where data are available in these earlier surveys, the lack of details in data acquisition, coordinate systems, and data reduction procedures limit their usefulness. The only complete geophysical report available concerns down-hole IP/resistivity results. Most notable is the 1996 Bouger gravity survey from the Bornite deposit into the Ambler lowlands. The Bornite deposit itself is seen as a significant 3 milligal anomaly. Numerous 2 milligal to \> 6 milligal anomalies occur under cover in the Ambler lowlands and near the Aurora Mountain and Pardner Hill occurrences. In addition to the geophysical surveys conducted by Kennecott, the ADNR completed an aeromagnetic survey of portions of the Ambler mining district in 1974-1975.

Several studies have been undertaken reviewing the geology and geochemistry of the Bornite deposit. Most notable is Murray Hitzman’s PhD dissertation at Stanford University and Don Runnel’s PhD dissertation at Harvard University. Bernstein and Cox reported on mineralization of the “No. 1 Ore Body” in a 1986 paper in Economic Geology. In addition to the historical work, Ty Connor at the Colorado School of Mines recently completed a Master’s thesis which reported on the timing of alteration and mineralization at the Bornite deposit.

Kennecott conducted two technical reviews of the groundwater conditions and a summary of the findings related to the flooding of the exploration shaft. In 1961, Kennecott collected 32 coarse reject samples from five drill holes to support preliminary metallurgical test work at Bornite. Samples targeted high-grade (\> 10%) copper mineralization from the Upper Reef at Ruby Creek.

Bornite Project - Geological Setting and Mineralization

The Bornite Project is located within the Arctic Alaska Terrane, a sequence of mostly Paleozoic continental margin rocks that make up the Brooks Range and North Slope of Alaska. It is within the Phyllite Belt geologic subdivision, which together with the higher-grade Schist Belt, stretches almost the entire length of the Brooks Range and is considered to represent the hinterland of the Jurassic Brooks Range orogeny. The southern margin of the Phyllite Belt is marked by mélange and low angle faults associated with the Kobuk River fault zone, while the northern boundary is thought to be gradational with the higher-grade metamorphic rocks of the Schist Belt.

The geology of the Bornite resource area is composed of alternating beds of carbonate rocks (limestone and dolostone) and calcareous phyllite. Limestone transitions laterally into dolostone, which hosts the majority of the mineralization and is considered to be hydrothermal in origin. Spatial relationships and petrographic work establish dolomitization as genetically related to early stages of the copper mineralizing system.

Work by Trilogy in 2015 focused on furthering the understanding of the distribution and nature of the various lithologic units and their context in a sedimentary depositional model. The updated model, based on lithogeochemical signatures of the various units along with their historical visual logging, shows stacked debris flows composed of basal non-argillaceous channelized debris flows breccias with a fining upward sequence of increasingly argillaceous-rich breccias capped by high calcium (Ca) phyllites, confined laterally in channels between either massive or thin-bedded platform carbonates. Two stacked debris flow sequences are apparent, the Lower and Upper reefs. The Upper reef grades vertically into capping argillaceous limestones instead of discrete high Ca phyllites indicating a shallowing upward or filling of the debris flow channels. Based on this updated interpretation, a series individual debris flow cycles have been modeled. Low calcium (Ca) phyllites, such as the Anirak schist (QP) and the Beaver Creek phyllite respectively underlie and cap the local stratigraphy suggesting different sourcing than the locally derived high Ca phyllites of the debris flow dominated Bornite Carbonate sequence stratigraphy. The Beaver Creek is in structural contact with the Bornite Carbonate Sequence while the contact with the underlying Anirak schist is an unconformity. In addition to the stacked sedimentary stratigraphy, a crosscutting breccia dubbed the P-Breccia has been identified in and around the recently discovered South Reef mineralization. Though poorly defined by the overall lack of drilling in the area, the body which contains excellent copper grade lies at or near the Iron Mountain discontinuity. It remains unclear whether the P Breccia is a post-depositional structural, hydrothermal or solution-collapse induced breccia.

Structural fabrics observed on the property include bedding and two separate foliations. Bedding (S0) can be measured only rarely where phyllite and carbonate are interbedded and it is unclear to what extent it is transposed. The pervasive foliation (S1) is easily measured in phyllites and may be reflected by colour banding and/or stylolamination (flaggy habit in outcrop) of the carbonates. Core logging shows that S1 is folded gently on the 10 m scale and locally tightly folded at the decimetre scale. S2 axial planar cleavage is locally developed in decimetre scale folds of S1. Both S1 and S2 foliations are considered to be Jurassic in age. Owing to their greater strength, bodies of secondary dolostone have resisted strain and foliation development, whereas the surrounding limestone and calc-phyllite appear in places to have been attenuated during deformation. This deformation, presumably Jurassic, complicates sedimentological interpretations. Potentially the earliest and most prominent structural feature in the resource area is the northeast-trending Iron Mountain discontinuity which is still problematic in its interpretation.

Mineralization at Bornite occurs as tabular mineralized zones that coalesce into crudely stratiform bodies hosted in secondary dolomite. Two significant dolomitic horizons that host mineralization have been mapped by drilling and include: 1) the Lower Reef, a thick 100 to 300 m thick dolomitized zone lying immediately above the basal quartz phyllite unit of the Anirak Schist; and 2) the Upper Reef, a 100 to 150 m thick dolomite horizon roughly 300 m higher in section.

The Lower Reef dolomite outcrops along the southern margin of the Ruby Creek zone and is spatially extensive throughout the deposit area. It hosts a significant portion of the shallow resources in the Ruby Creek zone as well as higher grade resources down dip and to the northeast in the South Reef. The Upper Reef zone hosts relatively high-grade resources to the north in the Ruby Creek zone. The Upper reef zone appears to lie at an important NE- trending facies transition to the NW of the main drilled area and locally appears to be at least partially thrust over the Lower Reef stratigraphy to the southeast.

Drill results from 2013 show dolomitization and copper mineralization in the Upper and Lower Reefs coalescing into a single horizon along the northern limits of current exploration. The NE- trending Ruby Creek and South Reef zones also coalesce into a roughly 1000 m wide zone of \>200 m thick dolomite containing significant copper mineralization dipping north at roughly 5-10 degrees.

Bornite Project – Mineralization

Copper mineralization at Bornite is comprised of chalcopyrite, bornite, and chalcocite distributed in stacked, roughly stratiform zones exploiting favourable stratigraphy within the dolomitized limestone package. Mineralization occurs, in order of increasing grade, as disseminations, irregular and discontinuous stringer-style veining, breccia matrix replacement, and stratiform massive sulphides. The distribution of copper mineral species is zoned around the bottom-centre of each zone, with bornite-chalcocite-chalcopyrite at the core and progressing outward to chalcopyrite-pyrite. Additional volumetrically minor copper species include carrollite, digenite, tennantite-tetrahedrite, and covellite. Stringer pyrite and locally significant sphalerite occur above and around the copper zones, while locally massive pyrite and sparse pyrrhotite occur in association with siderite alteration below copper mineralization in the Lower Reef.

In addition to the copper mineralization, significant cobalt mineralization is found accompanying bornite-chalcocite mineralization. Cobalt occurs with high-grade copper as both carrollite (Co2CuS4) and as cobaltiferous rims on recrystallized pyrite grains.

Appreciable silver values are also found with bornite-rich mineralization in the South Reef and Ruby Creek zones.

Bornite Project – Exploration

Exploration in and around the Bornite Project by Kennecott from 1957 to 1998 is summarized above. In addition to the extensive drilling completed during the more than 40 year tenure of Kennecott in the district, Kennecott completed widespread surface geochemical sampling, regional and property scale mapping, and numerous geophysical surveys employing a wide variety of techniques. The majority of this data has been acquired by us and forms the basis for renewed exploration that targets Bornite-style mineralization in the Bornite carbonate sequence.

NovaGold as the precursor company to us began to actively pursue an agreement to explore the Bornite Project with NANA in 2005 resulting in an initial airborne geophysical survey in 2006. Negotiations on the consolidation and exploration of the entire Ambler district continued for the next several years culminating in the NANA Agreement in October, 2011.

With the NANA Agreement approaching completion, NovaGold initiated work in 2010 to begin to characterize the exploration potential and depositional controls by re-logging and re-analyzing select drill holes with a Niton portable x-ray fluorescence (“XRF”) to determine geochemical variability. In 2011, NovaGold began an initial drill program to verify the historical database and exploration potential and conducted additional geophysical surveys to provide better targeting tools for continued exploration in the district. In 2012, we expanded the IP geophysical coverage completing a major district-wide survey that targeted the prospective Bornite Carbonate sequence. Subsequent resource drilling between 2011 and 2013 based on the exploration targeting is discussed in the “*Bornite Project - Mineral Resource Estimates”* section below.

2006 NovaGold Exploration

In 2006, NovaGold contracted Fugro Airborne Surveys to complete a detailed helicopter DIGHEM magnetic, EM and radiometric survey of the Cosmos Hills. The survey covered a rectangular block approximately 18 km by 49 km which totaled 2,852 line kilometres. The survey was flown at 300 m line spacing with a line direction of N20E. The DIGHEM helicopter survey system produced detailed profile data of magnetics, EM responses and radiometrics (total count, uranium, thorium, and potassium) and was processed into maps of magnetics, discrete EM anomalies, EM apparent resistivity, and radiometric responses.

2010 NovaGold Exploration

In 2010, in anticipation of completing the NANA Agreement, NANA granted NovaGold permission to begin low level exploration at Bornite; this consisted of re-logging and re-analyzing select drill holes using a Niton portable XRF. In addition to the 2010 re-logging effort, NovaGold contracted a consulting geophysicist, Lou O'Connor, to compile a unified airborne magnetic map for the Ambler mining district from Kennecott, Alaska DNR, and NovaGold airborne geophysical surveys.

2011 NovaGold Exploration

In 2011, NovaGold contracted Zonge International Inc. (“Zonge”) to conduct both dipole-dipole complex resistivity induced polarization (“CRIP”) and natural source audio-magnetotelluric (“NSAMT”) surveys over the northern end of the prospect to develop tools for additional exploration targeting under cover to the north.

NSAMT data were acquired along two lines totaling 5.15 line-km, with one line oriented generally north-south through the centre of the survey area and one being the southernmost east-west line in the survey area. CRIP data were acquired on five lines: four east-west lines and one north-south line, for a total coverage of 14.1 line-km and 79 collected CRIP stations. The initial objective of the survey was to investigate geological structures and the distribution of sulphides possibly associated with copper mineralization.

Results from the paired surveys show that wide-spaced dipole-dipole resistivity is the most effective technique to directly target the mineralization package. Broad low resistivity anomalies reflecting pyrite haloes and mineralization appear to define the limits of the fluid package. Well-defined and often very strong chargeability anomalies are also present, but appear in part to be masked by phyllitic units which also have strong chargeability signatures. The NSAMT show similar resistivity features as the IP, but are less well resolved.

2012 Trilogy Exploration

In light of the success of the 2011 geophysical program, we contracted Zonge to conduct a major district-wide dipole/dipole IP survey, a down-hole IP radial array survey in the South Reef area, and an extensive physical property characterization study of the various lithologies to better interpret the existing historical geophysical data.

Zonge completed 48 line km of 200 m dipole/dipole IP during 2012, infilling and expanding on the 2011 survey, and stretching across the most prospective part of the outcropping permissive Bornite Carbonate sequence. The results show a well-defined low resistivity area associated with mineralization and variable IP signatures attributed both to mineralization and the overlying Beaver Creek phyllite. Numerous target areas occur in the immediate Bornite area with lesser targets occurring in the Aurora Mountain and Pardner Hill areas and in the far east of the survey area. During the 2012 drill program at South Reef, a single drill hole was targeted on a low resistivity area approximately 500 m to 600 m southeast of the South Reef mineralization trend. Although the drill hole intersected some dolomite alteration in the appropriate stratigraphy, no significant sulphides were encountered.

In addition to the extensive ground IP survey, Zonge also completed 9 km of down-hole radial IP using an electrode placed in drill hole RC12-0197 to further delineate the trend and potential in and around the South Reef. In addition to the 2012 ground geophysical surveys, extensive physical property data including resistivity, chargeability, specific gravity, and magnetic susceptibility were captured for use in modelling the existing ground IP and gravity surveys, and the airborne EM and magnetic surveys.

In addition to geophysical focused exploration, a district wide geologic map was compiled integrating Kennecott’s 1970’s mapping of the Cosmos Hills with selective Trilogy mapping in 2012.

### 2013 Trilogy Exploration

The emphasis of the 2013 program was to further validate and refine the 2012 geologic map of the Cosmos Hills. A deep penetrating soil and vegetation geochemical orientation survey was completed over the South Reef deposit, utilizing various partial leaches and pH methods. The initial, approximately 1 km, test lines suggest a good response for several of the partial leaches of the soils but little response in the vegetative samples; further follow-up is warranted to the north of the deposit into the Ambler lowlands.

### 2014 Trilogy Exploration

During 2014, exploration work was limited to a re-logging and re-sampling program of historical Kennecott drill core.

### 2015 Trilogy Exploration

As a follow-up to the 2013 field program, a deep penetrating soil and vegetation geochemical survey was extended north of the deposit into the Ambler lowlands. Trilogy geologists completed a lithogeochemical desktop study and a comprehensive update to the 3D lithology model; the updated domains have been utilized in the most recent resource estimation.

### Bornite Project – Drilling

A total of 183 surface core holes and 51 underground core holes, totaling 78,147 m have been drilled, targeting the Bornite deposit during 21 different annual campaigns dating from 1957 through 2013. All of the drill campaigns, with the exception of the 2011 NovaGold campaign and the 2012 and 2013 Trilogy campaigns were completed by Kennecott or their exploration subsidiary BCMC. All drill holes (except RC13-230 and RC13-232 which have been reserved for metallurgical studies) were utilized in the estimation of the current resource.

Sprague and Henwood, a Pennsylvania-based drilling company, completed all of the Kennecott drilling, with the exception of the 1997 program (three drill holes) completed by Tonto Drilling Services, Inc. (a NANA-Dynatech company). The 2011 thru 2013 NovaGold/Trilogy programs used Boart Longyear Company as the drill contractor.

In the initial years of drilling at Bornite, Kennecott relied on AX core (1.1875 in or 30.2 mm diameter), but, as drilling migrated towards deeper targets, a change to BX core (1.625 in or 41.3 mm diameter) was implemented to help limit deviation. From 1966 to 1967, drilling activity at Bornite moved underground and EX diameter core (0.845 in or 21.5 mm diameter) was implemented to define the Ruby Creek Upper Reef zone “No.1 Ore Body”. Drilling activity moved back to the surface in 1968, and, from 1968 to 1972, BX core was most commonly drilled. In later years, core size increased to NX (2.125 in or 54.0 mm diameter) and finally, in 2011, core size increased to NQ (1.874 in or 47.6 mm diameter) and HQ (2.5 in or 63.5 mm diameter). Progressively larger diameter drill rods have been continually used over the years in an attempt to minimize drill hole deviations.

There is only partial knowledge of specific drill core handling procedures used by Kennecott during their tenure at the Bornite Deposit. All of the drill data collected during the Kennecott drilling programs (1958 to 1997) was logged on paper drill logs, copies of which are stored in the Kennecott office in Salt Lake City, Utah. Electronic scanned copies of the paper logs, in PDF format, are held by Trilogy. Drill core was sawed or split with a splitter, with half core submitted to various assay labs and the remainder stored in the Kennecott core storage facility at the Bornite Deposit. In 1995, Kennecott entered the drill assay data, the geologic core logs, and the down hole collar survey data into an electronic format. In 2009, NovaGold geologists verified the geologic data from the original paper logs against the Kennecott electronic format and then merged the data into a Microsoft™ SQL database. Sampling of drill core by Kennecott and BCMC focused primarily on the moderate to high grade mineralized zones. Intervals of visible sulphide mineralization containing roughly \>0.5 to 1% copper were selected for analysis by Union Assay Office Inc. of Salt Lake City, Utah. This approach left numerous intervals containing weak to moderate copper mineralization un-sampled in the historic drill core. During the 2012 exploration program, we began sampling a portion of this remaining drill core in select holes in the South Reef area. Trilogy extended this sampling program to the Ruby Creek area in 2013 and 2014.

Throughout our tenure at Bornite, the following core handling procedures have been implemented. Core is slung by helicopter, or transported by truck or ATV, from the drill rig to the core-logging facility. Upon delivery, geologists and geotechnicians open and inspect the core boxes for any irregularities. They first mark the location of each drilling block on the core box, and then convert footages on the blocks into metric equivalents. Geotechnicians or geologists measure the intervals (or “from/to”) for each box of core and include this information, together with the drill hole ID and box number, on a metal tag stapled to the end of each box. Geotechnicians then measure the core to calculate percent recovery and rock quality designation (“RQD”). RQD is the sum of the total length of all pieces of core over 12 cm in a run. The total length of core in each run is measured and compared to the corresponding run length to determine percent recovery. Core is then logged with lithology and visual alteration features captured on observed interval breaks. Mineralization data, including total sulphide (recorded as percent), sulphide type (recorded as a relative amount), and gangue and vein mineralogy are collected for each sample interval with an average interval of approximately 2 m. Structural data is collected as point data. Geologists then mark sample intervals to capture each lithology or other geologically appropriate intervals. Sample intervals of core are typically between 1 m and 3 m in length but are not to exceed 3 m in length. Occasionally, if warranted by the need for better resolution of geology or mineralization, smaller sample intervals have been employed. Geologists staple sample tags on the core boxes at the start of each sample interval, and mark the core itself with a wax pencil to designate sample intervals. This sampling approach is considered sound and appropriate for this style of mineralization and alteration. Drill core is digitally photographed prior to sampling. Drill core is cut in half using diamond core saws. Specific attention to core orientation is maintained during core sawing to ensure that representative samples are obtained. One-half of the core is retained in the core box for storage on site, or at our Fairbanks warehouse, and the other half bagged and labeled for analysis. Samples are selected for specific gravity measurements.

In 2013, 33 historic drill holes in the Ruby Creek area, and in 2014, 37 historic drill holes in the Ruby Creek Area were re-logged, re-sampled and re-assayed as these holes had previously only been selectively sampled by Kennecott. Entire holes were re-logged utilizing Trilogy protocols discussed above. Samples were submitted either as halfcore, where previously sampled, or whole core where un-sampled (this was done to ensure that a sufficient volume of material was provided for analysis). Sample intervals were matched to historic intervals whenever possible, or selected to reflect Trilogy sampling procedures described above. The objectives of the re-assay/re-logging program were threefold: 1) to implement a QA/QC program on intervals previously sampled by Kennecott in order to confirm the validity of their results; 2) to identify additional lowergrade (0.2-0.5% copper), which was not previously sampled; and 3) to provide additional multi-element ICP data to assist in the geologic interpretation of the deposit.

Bornite Project - Sample Preparation, Analyses and Security

Sample preparation, analytical lab accreditation and security measures taken during historical Kennecott and BCMC programs are unknown to us; however, we are not aware of any reason to suspect that any of these samples have been tampered with. The 2011 to 2013 samples were either in the custody of NovaGold or Trilogy personnel or the assay laboratories at all times, and the chain of custody of the samples is well documented.

Once drill core was sawed, one half was retained for future reference and the other half was sent to ALS Minerals (formerly ALS Chemex) in Vancouver for analyses. Shipment of core samples from the Bornite camp occurred whenever backhaul capacity was available on the chartered aircraft, which was generally 5 to 6 days a week. Rice bags, containing two to four individual poly-bagged core samples, were marked and labeled with the ALS Minerals address, project name (Bornite), drill hole number, bag number, and sample numbers enclosed. Rice bags were secured with a pre-numbered plastic security tie, assembled into loads for transport by chartered flights on a commercial airline to Fairbanks, and directly delivered by a contracted expeditor to the ALS Minerals preparation facility in Fairbanks. In addition to the core samples, control samples were inserted into the shipments at the approximate rate of one standard, one blank and one duplicate per 17 core samples. Samples were logged into a tracking system on arrival at ALS Minerals, and weighed. Samples were then crushed, dried, and a 250 g split was pulverized to greater than 85% passing 75 μm.

Gold assays in 2011 and 2012 were determined using fire analysis followed by an atomic absorption spectroscopy (“AAS”) finish; gold was not analyzed in 2013 or 2014. The lower detection limit was 0.005 ppm gold; the upper limit was 10 ppm gold. An additional 48-element suite was assayed by inductively coupled plasma-mass spectrometry (“ICP-MS”) and ICP-AES methodologies, following a four acid digest. Over limit (\>1.0%) copper and zinc analyses were completed by AA, following a four acid digest.

ALS Minerals has attained International Organization for Standardization (ISO) 9001:2000 registration. In addition, the ALS Minerals laboratory in Vancouver is accredited to ISO 17025 by Standards Council of Canada for a number of specific test procedures including fire assay of gold by AA, ICP and gravimetric finish, multi-element ICP and AA assays for silver, copper, lead and zinc. Trilogy has no relationship with any primary or check assay labs utilized.

During 2012, 2013 and 2014, Trilogy staff performed continuous validation of the drill data; both while logging was in progress and after the field program was complete. Trilogy also retained independent consultant Caroline Vallat, P.Geo. of GeoSpark Consulting Inc. to: 1) import digital drill data to the master database and conduct QA/QC checks upon import, 2) conduct a QA/QC review of paired historical assays and Trilogy 2012, 2013 and 2014 re-assays; 3) monitor an independent check assay program for the 2012, 2013, and 2014 campaigns; and 4) generate a QA/QC report for the 2012, 2013, and 2014 campaigns.

Bornite Project - Mineral Resource Estimates

The mineral resource estimate has been prepared by Bruce M. Davis, FAusIMM, BD Resource Consulting, and Robert Sim, P.Geo., SIM Geological Inc., both “Independent Qualified Persons” as defined in NI 43-101. We have filed three previous NI 43-101 Technical Reports on the Bornite Project dated March 18, 2014, February 5, 2013 and July 18, 2012. The effective date of this resource is April 19, 2016.

The Bornite Project database comprises a total of 235 diamond drill (core) holes totaling 78,745 m; 174 holes target the Ruby Creek zone and 42 holes target the South Reef zone. The remaining 19 holes in the database are exploratory in nature and test for satellite mineralization proximal to the Bornite Deposit. The database contains a total of 29,262 samples that have been analyzed for copper content. During 2014, Trilogy geologists re-logged and sampled 37 Kennecott drill holes comprising approximately 13,000 meters with partial or no assays. The new resource estimate incorporates the results from the 2014 field program as well as advancements to the 3D geological model completed during 2015.

Mineralization in the Ruby Creek zone occurs as two discrete strata bound lenses: a Lower Reef which outcrops and dips approximately 10-15 degrees to the northeast; and an Upper Reef lying roughly 150+ meters above the Lower Reef stratigraphy and which includes a small high-grade zone historically referred to as the "No.1 Orebody" by Kennecott. Mineralization is hosted by a Devonian age carbonate sequence containing broad zones of dolomite alteration and associated sulfide mineralization including bornite, chalcopyrite, and chalcocite occurring as disseminations and vein stockworks as well as crackle and mosaic breccia fillings and locally massive to semi-massive replacement bodies. The geological and assay database have been reviewed and audited by BDRC and SGI. It is of the opinion of BDRC and SGI that the current drilling information is sufficiently reliable to interpret with confidence the boundaries for copper mineralization and that the assay data are sufficiently reliable to support mineral resource estimation. That estimation utilizes two-meter compositing of assays from 216 drill holes completed between 1961 and 2013. Estimated blocks were 5 x 5 x 5 meters on a side.

Sixty domains were established for the estimation, all of which were treated as hard boundaries with no mixing of data between the domains. A series of carbonate and phyllite lithology domains together with grade probability shells at 2% copper and 0.2% copper thresholds were used to constrain the estimates. Visual inspections of the probability shells show that they fit well with observed levels of bornite, chalcocite and chalcopyrite mineralization.

Based on the interpreted local high-grade nature of the mineralization, both capping and outlier restriction strategies were implemented to control the influence of high-grade mineralization in the resource model. This methodology removed approximately 3% of the contained copper in the Ruby Creek area and 7% of the contained copper in the South Reef area.

A total of 5,366 samples containing specific gravity measurements were utilized to estimate densities in the block model. Specific gravity values were estimated into model blocks using inverse distance squared moving averages using the domains described previously.

Copper grades in model blocks were estimated using ordinary kriging. A dynamic search orientation strategy was utilized, during both grade and specific gravity interpolations, which is controlled by the interpreted trends of mineralization in the Upper, Lower and South Reef zones. The block model has been validated through a combination of visual and statistical methods to ensure that the grade and density estimates are an appropriate representation of the underlying sample data.

The Bornite deposit comprises several zones of relatively continuous moderate- to high-grade copper mineralization that extends from surface to depths of more than 800 m below surface. The deposit is potentially amenable to a combination of open pit and underground extraction methods. It is important to recognize that these discussions of underground and surface mining parameters are used solely for the purpose of testing the “reasonable prospects for economic extraction,” and do not represent an attempt to estimate mineral reserves. No mineral reserves have been calculated for the Bornite Project.

Indicated Mineral Resources includes blocks in the model that are potentially amenable to open pit extraction methods and are delineated by drilling with holes spaced at a maximum distance of 75 meters, and exhibit a relatively high degree of confidence in the grade and continuity of mineralization. Resources in the Inferred category require a minimum of one drill hole within a maximum distance of 100 m and exhibit reasonable confidence in the grade and continuity of mineralization.

In the opinion of the Qualified Persons, the level of understanding of the geologic controls that influence the distribution of copper mineralization at the Bornite Deposit is relatively good. The drilling, sampling and validation practices utilized by Trilogy during the various campaigns have been conducted in a professional manner and adhere to accepted industry standards. The confidence in older, historic, drilling conducted by Kennecott has been demonstrated through a series of validation checks and, overall, the underlying database is considered sufficient for the estimation of Indicated and Inferred mineral resources. The mineral resources have been estimated in conformity with generally accepted CIM Estimation of Mineral Resources and Mineral Reserves Best Practices Guidelines and are reported in accordance with the Canadian Securities Administrators’ NI 43-101. Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resource will be converted into mineral reserve. The estimate of mineral resources for the Bornite Project are summarized in, “*Bornite Project – Mineral Resource Statement”.*

Bornite Project - Mineral Resource Statement

Mineral Resources are classified in accordance with the 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves.

The Qualified Persons for the Mineral Resource estimate are Bruce Davis and Robert Sim, both Qualified Person’s independent of us. Mineral Resources for the Bornite Project are found in Table 7 and Table 8.

### Table 7: Indicated Resource Estimate for the Bornite Project

*See “Cautionary Note to United States Investors”* This section uses the term “indicated resources”. We advise United States investors that these terms are not recognized by the SEC. United States investors are cautioned not to assume that estimates of indicated mineral resources are economically minable, or will be upgraded into measured mineral resources. See “*Risk Factors”* and “*Cautionary Note to United States Investors”.*

*Indicated*

| Type | Cut-off (Cu %) | M tonnes | Grade (Cu %) | Contained Metal (Mlbs Cu) |
| --- | ---: | ---: | ---: | ---: |
| **In-Pit(2)** | 0.5 | 40.5 | 1.02 | 913 |

|  |  |  |
| --- | --- | --- |
| Notes: | 1. | These resource estimates have been prepared in accordance with NI 43-101 and the CIM Definition Standards. Mineral resources that are not mineral reserves do not have demonstrated economic viability. See “Risk Factors” and “Cautionary Note to United States Investors.” |
|  | 2. | Resources stated as contained within a pit shell developed using a metal price of US$3.00/lb Cu, mining costs of US$2.00/tonne, milling costs of US$11/tonne, G&A cost of US$5.00/tonne, 87% metallurgical recoveries and an average pit slope of 43 degrees. |
|  | 3. | Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content. |
|  | 4. | Tonnage and grade measurements are in metric units. Contained copper are reported as imperial pounds. |
|  | 5. | All amounts are stated in U.S. dollars unless otherwise noted. |

54

### Table 8: Inferred Resource Estimate for the Bornite Project

*See “Cautionary Note to United States Investors”* This section uses the term “inferred resources”. We advise United States investors that these terms are not recognized by the SEC. The estimation of inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources. United States investors are cautioned not to assume that estimates of inferred mineral resources exist, are economically minable, or will be upgraded into measured or indicated mineral resources. See “*Risk Factors”* and “*Cautionary Note to United States Investors”.*

*Inferred*

| Type | Cut-off (Cu %) | M tonnes | Grade (Cu %) | Contained Metal (Mlbs Cu) |
| --- | ---: | ---: | ---: | ---: |
| In-Pit (2) | 0.5 | 84.1 | 0.95 | 1,768 |
| Below-Pit (3) | 1.5 | 57.8 | 2.89 | 3,683 |
| **Total Inferred** |  | **141.9** | **1.74** | **5,450** |

|  |  |  |
| --- | --- | --- |
| Notes: | 1. | These resource estimates have been prepared in accordance with NI 43-101 and the CIM Definition Standards. See “Risk Factors” and “Cautionary Note to United States Investors.” |
|  | 2. | Resources stated as contained within a pit shell developed using a metal price of US$3.00/lb Cu, mining costs of US$2.00/tonne, milling costs of US$11/tonne, G&A cost of US$5.00/tonne, 87% metallurgical recoveries and an average pit slope of 43 degrees. |
|  | 3. | Mineral resources at a 1.5% cut-off are considered as potentially economically viable in an underground mining scenario based on an assumed projected copper price of $3.00/lb, underground mining costs of $65.00 per tonne, milling costs of $11.00 per tonne, G&A of $5.00 per tonne, and an average metallurgical recovery of 87%. |
|  | 4. | Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content. |
|  | 5. | Tonnage and grade measurements are in metric units. Contained copper are reported as imperial pounds. |
|  | 6. | All amounts are stated in U.S. dollars unless otherwise noted. |

There are no known factors related to environmental, permitting, legal, title, taxation, socio-economic, marketing or political issues which could materially affect the mineral resource.

Bornite Project – Metallurgy

Metallurgical testwork to date indicates that the Bornite Project can be treated using standard grinding and flotation methods to produce copper concentrates. Initial testing indicates copper recoveries of approximately 87% resulting in concentrate grades of approximately 28% copper with very low potential penalty elements. Further metallurgical testwork is warranted to test these assumptions.

Bornite Project – Environmental Considerations

The Bornite Project area includes NANA’s Bornite and ANCSA lands, the Ruby Creek drainage (a tributary of the Shungnak River), the Shungnak River drainage, and portions of the Ambler Lowlands. Since 2007, baseline environmental data collection has occurred in the area including archaeology, aquatic life surveys, sediment sampling, wetlands mapping, surface water quality sampling, hydrology, meteorological monitoring, and subsistence. Additional baseline environmental data in NANA’s Bornite and ANCSA lands, the Ruby Creek drainage, the Shungnak River drainage, portions of the Ambler Lowlands, and downstream receiving environments will be required to support future mine design, development of an EIS, permitting, construction and operations.

Bornite Project – Mining Operations

The Bornite Project is not currently in production; for contemplated exploration or development activities see below.

Bornite Project – Exploration and Development Permitting

Development of the Bornite Project will require a significant number of permits and authorizations from state, federal, and regional organizations. Much of the groundwork to support a successful permitting effort must be undertaken prior to submission of permit applications so that issues can be identified and resolved, baseline data can be acquired, and regulators and stakeholders can become familiar with the proposed project. The comprehensive permitting process for the Bornite Project can be divided into three categories:

1\. Exploration state/regional permitting: required to obtain approval for drilling, camp operations, engineering, and environmental baseline studies.

2\. Pre-application phase: conducted in conjunction with engineering feasibility studies. This stage includes the collection of environmental baseline data and interaction with stakeholders and regulators to facilitate the development of a project that can be successfully permitted.

3\. The National Environmental Policy Act phase: formal agency review of the Federal and State requirements for public and agency participation to determine if and how the Bornite Project can be done in an acceptable manner.

The permit review process will determine the number of management plans required to address all aspects of the Project to ensure compliance with environmental design and permit criteria. Each plan will describe the appropriate environmental engineering standard and the applicable operations requirements, maintenance protocols, and response actions.

### Bornite Project – Current Activities

Following the release in the spring of 2016 of the Bornite Report, we focused field investigations and drilling activities on advancing our Arctic Project towards pre-feasibility. Field work at the Bornite Project consisted of continued environmental baseline data collection and the completion of the LiDAR survey over the greater project area initiated in 2015. We continue to evaluate geological and hydrogeological data to support internal desktop evaluations and planning of future field investigations at the Bornite project.

## Legal proceedings

As filed, 516 characters.

From time to time, we are a party to routine litigation and proceedings that are considered part of the ordinary course of business. We are not aware of any material current, pending, or threatened litigation. There are no material proceedings pursuant to which any of our directors, officers or affiliates or any owner of record or beneficial owner of more than 5% of our securities or any associate of any such director, officer or security holder is a party adverse to us or has a material interest adverse to us.

## Management's discussion and analysis

As filed, 46,121 characters.

### Management’s Discussion and Analysis

### For the Fourth Quarter and Year Ended November 30, 2016

(expressed in US dollars)

General

This Management’s Discussion and Analysis (“MD&A”) of Trilogy Metals Inc. (“Trilogy”, “the Company” or “we”) is dated February 2, 2017 and provides an analysis of our audited financial results for the year ended November 30, 2016 compared to the year ended November 30, 2015.

The following information should be read in conjunction with our November 30, 2016 audited consolidated financial statements and related notes which were prepared in accordance with United States generally accepted accounting principles (“U.S. GAAP”). A summary of the U.S. GAAP accounting policies are outlined in note 2 of the audited consolidated financial statements. All amounts are in United States dollars unless otherwise stated. References to “Canadian dollars” and “C$” and “CDN$” are to the currency of Canada, references to “U.S. dollars”, “$” or “US$” are to the currency of the United States and references to “Colombian pesos” or “COP” are to the currency of the Republic of Colombia.

Erin Workman, P.Geo., an employee and the Director, Technical Services, is a Qualified Person under National Instrument 43-101 - *Standards of Disclosure for Mineral Projects (“*NI 43-101”), and has approved the scientific and technical information in this MD&A.

Trilogy’s shares are listed on the Toronto Stock Exchange (“TSX”) and the NYSE-MKT under the symbol “TMQ”. Additional information related to Trilogy, including our annual report on Form 10-K, is available on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

Description of business

We are a base metals exploration company focused on exploring and developing our mineral holdings in the Ambler mining district located in Alaska, U.S.A. We conduct our operations through a wholly-owned subsidiary, NovaCopper US Inc. which is doing business as Trilogy Metals US (“NovaCopper US”). Our Upper Kobuk Mineral Projects, (“UKMP” or “UKMP Projects”), consist of: i) the 100% owned Ambler lands which host the Arctic copper-zinc-lead-gold-silver Project; and ii) the Bornite lands being explored under a collaborative long-term agreement with NANA Regional Corporation, Inc. (“NANA”), a regional Alaska Native Corporation, which host the Bornite carbonate-hosted copper Project.

Property review

Our principal assets, the UKMP Projects, are located in the Ambler mining district in Northwest Alaska. Our UKMP Projects comprise approximately 352,943 acres (142,831 hectares) consisting of the Ambler and Bornite lands.

Arctic Project

The Ambler lands, which host a number of deposits, including the high-grade copper-zinc-lead-gold-silver Arctic Project, and other mineralized targets within a 100 kilometer long volcanogenic massive sulfide (“VMS”) belt, are owned by NovaCopper US. The Ambler lands are located in Northwestern Alaska and consist of 112,058 acres (45,348 hectares) of Federal patented mining claims and State of Alaska mining claims, within which VMS mineralization has been found.

We have recorded the Ambler lands as a mineral property with acquisition costs capitalized and exploration costs expensed in accordance with our accounting policies. As a result of the spin-out of Trilogy from NovaGold Resources Inc. (“NovaGold”) in 2012, the consolidated financial statements have been presented under the continuity of interest basis of accounting whereby the amounts are based on the amounts originally recorded by NovaGold as if we had held the property from inception.

Bornite Project

On October 19, 2011, NovaCopper US and NANA signed a collaborative agreement to explore and develop the Ambler mining district. Under the Exploration Agreement and Option to Lease (the “NANA Agreement”), we acquired the exclusive right to explore the Bornite property and lands deeded to NANA through the Alaska Native Claims Settlement Act (“ANCSA”), located adjacent to the Arctic Project, and the non-exclusive right to access and entry onto NANA’s lands. The agreement establishes a framework for any future development of either the Bornite Project or the Arctic Project. Both projects are included as part of a larger area of interest set forth in the NANA Agreement. The agreement with NANA created a total land package incorporating our Ambler lands with the adjacent Bornite and ANCSA lands with a total area of approximately 352,900 acres (142,831 hectares).

As consideration, $4.0 million was paid to NANA upon signing the NANA agreement and we gave NANA the right to appoint a member to Trilogy’s board of directors before April 2017. NANA has not exercised their right to appoint a board member at this time. Upon the decision to proceed with development of a mine within the area of interest, NANA maintains the right to purchase an ownership interest in the mine equal to between 16%-25% or retain a 15% net proceeds royalty which is payable after we have recovered certain historical costs, including capital and cost of capital. Should NANA elect to purchase an ownership interest in the mine, consideration will be payable based on the elected percentage purchased and all the costs incurred on the properties less $40.0 million, not to be less than zero. The parties would form a joint venture and be responsible for all future costs incurred in connection with the mine, including capital costs of the mine, based on each party’s pro-rata share.

NANA would also be granted a net smelter return royalty between 1% and 2.5% upon the execution of a mining lease or a surface use agreement, the amount of which is determined by the particular area of land from which production originates.

We have accounted for the Bornite property as a mineral property with acquisition costs capitalized and exploration costs expensed in accordance with our accounting policies.

Titiribi Project

On June 19, 2015, Trilogy completed an arrangement to acquire Sunward Resources Ltd. (“Sunward”). As a result, Trilogy, through wholly-owned subsidiaries, Sunward Investments Ltd. (“Sunward Investments”), owned 100% of the Titiribi gold-copper exploration project located approximately 70 kilometers southwest of the city of Medellin, in Antioquia Department, Colombia. The Titiribi project’s principal mining title is concession 5085, which was created by the consolidation of five concessions and four exploration licenses. This concession, comprising of an area of 3,919 hectares, was registered with the National Mining Registry on April 18, 2013 and expires in 2043.

Following the announcement of the sale of Sunward Investments (see “Corporate developments – Sale of Sunward Investments Ltd.”), and its ownership of the Titiribi project, we have accounted for it as a discontinued operation. The financial results have been adjusted retrospectively for the treatment as a discontinued operation.

Corporate developments

#### Name Change

In September 2016, we changed our name to Trilogy Metals Inc. to better reflect our Company’s naturally diversified resource base. The UKMP is located in the Ambler mining district in Northwest Alaska; a region known to host deposits rich in copper, zinc, lead, gold and silver. The Company controls the mineral rights to approximately 353,000 acres of land containing two known mineral belts, the Ambler Schist Belt and the Bornite Carbonate Sequence. The Ambler Schist Belt hosts VMS type mineralization occurring as a series of high-grade polymetallic copper-lead-zinc-gold-silver deposits along the entire 100 kilometer (70 mile) long belt. The Bornite Carbonate Sequence hosts several copper replacement targets around the Aurora and Pardner Hill prospects, in addition to an established resource identified at Bornite. Mineralization at Bornite is open to further exploration. Upon opening of the markets on September 8, 2016, our shares began trading on the TSX and the NYSE-MKT under the symbol “TMQ”. Shareholders approved the name change to Trilogy at our annual and special meeting of shareholders held on May 18, 2016.

#### Sale of Sunward Investments

On September 1, 2016, Trilogy completed the sale of all of the issued and outstanding shares of Sunward Investments to Brazil Resources Inc. (“BRI”) for consideration of 5,000,000 common shares of BRI, of which 2,500,000 common shares are subject to a six month holding period, and 1,000,000 BRI warrants, with each warrant exercisable into one common share of BRI for a period of two years from the completion date at an exercise price of CDN$3.50. The total consideration was valued at approximately $8.1 million. Sunward Investments, through a subsidiary, owns 100% of the Titiribi gold-copper exploration project. On December 7, 2016 BRI changed its name to GoldMining Inc.

The Company reclassified the operations of Sunward Investments as a discontinued operation, retrospectively, and recognized a gain on the sale of $4.4 million in the fourth quarter of 2016.

#### Long-term incentives

During the year ended November 30, 2016, the Board of Directors approved the granting of 1,785,000 stock options to employees, consultants and directors with various vesting terms over two years and 600,000 restricted share units (“RSUs”) to officers vesting equally in thirds on the grant date, the first anniversary of the grant date, and the second anniversary of the grant date.

Project activities

In the spring of 2016 we announced the release of an updated resource estimate and National Instrument 43-101 Technical Report on the Bornite Project. The update incorporated a new 3D lithology, alteration and structural model for the Bornite deposit, as well as results from previously un-sampled or partially sampled historical Kennecott drill core. A positive update with contained copper in Indicated Resources increasing from 334 to 913 million pounds constituting a 173% increase in contained metal. Total contained copper in Inferred Resources decreased from 5.7 to 5.5 billion pounds (1.8Blbs in-pit and 3.7Blbs below-pit) which constitutes a 4% decrease in contained metal due principally to moving in-pit Inferred Resources to the Indicated category. We continue to evaluate geological and hydrogeological data to support internal desktop evaluations and planning of future field investigations at the Bornite project.

In fiscal 2016, we expended $5.0 million on the UKMP Projects, mainly at Arctic, consisting of $1.3 million in wages and benefits, $0.7 million in drilling, $0.7 million in engineering expenses, $1.3 million in project support expenses, $0.4 million in land maintenance and permit expenses, and $0.3 million in environmental studies. The Company completed another successful field season in 2016 advancing the Arctic deposit towards pre-feasibility. We accomplished a 3,058 meter drill program at the Arctic Project, significant baseline environmental data collection, and furthered the engineering of the project. The summer field season was completed on time and 10% under budget, with a total spend of $5.0 million in 2016. The 2016 drill program was designed to collect data for geotechnical, hydrological, waste rock characterization and metallurgical studies as well as further resource definition.

Three drill holes representing 822 meters drilled were designed to collect geotechnical and hydrological data within the proposed Arctic open-pit. Data collected from the geotechnical/hydrological drill program was used to update a 3D structure model, rock mass model, and hydrogeology model and these results have been integrated into a combined geotechnical model that will be used for characterization of geotechnical domains and slope stability evaluation in a future pre-feasibility study.

Four drill holes representing 1,030 meters drilled were designed to collect metallurgical samples, specifically targeting material within the initial production years of the Arctic open-pit. A metallurgical test work program is currently underway and expected to be complete in Q1-2017.

Six drill holes representing 1,206 meters drilled were designed to evaluate vertical and lateral continuity of the high grade polymetallic copper, gold, silver, lead, and zinc mineralization, and support upgrading of Inferred resources to Measured and Indicated resource classification within the area of the proposed Arctic open-pit. We are pleased to announce that all six infill holes encountered mineralized intervals consistent with previous drilling conducted within the resource area on the property. Data collected from the drill program was used to update the 3D geology model. The updated geology domains and drill data will be incorporated into an updated resource estimate that will support a future pre-feasibility study.

Substantial field work was also completed to support the continuation of baseline environmental data collection. During the course of the field season, data collection was completed to support an aquatic survey, an avian and large mammal habitat survey, an archaeological survey and expansion of the wetlands delineation and surface quality work. An aquatics survey of rivers and creeks over the UKMP included identification of fish species present and tissues metals testing. An avian survey over the UKMP was conducted in May to identify bird nest locations, with a follow-up survey in July to measure fledging success. A habitat survey was completed in conjunction with the wetlands survey and will be used to inform future biological surveys. Approximately 2,400 acres were surveyed for archaeological resources in or around the potential Arctic open-pit and facilities locations. Approximately 2,900 acres of wetlands were delineated using techniques approved by the Army Corps of Engineers. On-going baseline environmental data collection included maintenance of three hydrologic gauging stations and one meteorological station. Surface water quality samples were taken from sixteen surface water locations and analyzed for a full suite of parameters including total and dissolved metals.

We continue to advance the acid-base-accounting static and kinetic test work at Arctic. Continuous down-hole samples were collected from this year’s drill program to support static testing coverage over the Arctic deposit. On-site barrel sampling was successfully completed in the spring and fall of 2016 to support the kinetics program, and in August we achieved the 40-week milestone for the parallel laboratory humidity cells; maintenance and monitoring of all kinetic tests will continue into 2017.

The LiDAR survey that was incomplete last year due to weather conditions was also completed during the summer. Final deliverables were received this fall has have already proven helpful in supporting on-going engineering design and geological modeling.

We continued our efforts on supporting the Alaska Industrial Development Export Authority ("AIDEA”) throughout 2016 towards drafting an Environmental Impact Statement (“EIS”) as prescribed under the National Environmental Policy Act process to permit the Ambler Mining District Industrial Access Project (“AMDIAP”). The AMDIAP is anticipated to provide surface access to the Ambler mining district and our UKMP Projects – Arctic and Bornite. The project design is modeled on AIDEA’s successful DeLong Mountain Transportation System (“DMTS”), which includes an industrial access road from the Red Dog Mine to the DMTS port. AIDEA worked with private industry to develop the DMTS industrial access road, and the costs of road construction were paid back through tolls on road use. AMDIAP, once complete, will provide access to the Ambler Mining District through Gates of the Arctic National Preserve. This access is guaranteed in the Alaska National Interest Lands Conservation Act (“ANILCA”).

On October 21, 2015, Alaska’s Governor authorized AIDEA to begin the EIS process and shortly thereafter, the Consolidated SF299 ANILCA applications were submitted by AIDEA to the relevant federal agencies, including the National Park Service (“NPS”), the U.S. Army Corp of Engineers (“USACE”), Bureau of Land Management (“BLM”), U.S. Coast Guard (“USCG”), and the U.S. Federal Highway Administration (“FHWA”). NPS, USACE, BLM, and FHWA have accepted the application to move forward and have determined that BLM will be the lead federal agency for the EIS, along with NPS taking the lead on the Environmental and Economic Analysis (“EEA”) per ANILCA Section 201.4(d). A project kickoff meeting with State of Alaska and Federal agencies was held in early December 2016 to discuss next steps which include the scope of work for the third party EIS contractor, anticipated timing of BLM issuance of the Notice of Intent between March 2017 and May 2017, and NPS and FHWA working on the EEA. More information on the AMDIAP and the ANILCA permitting process is available on AIDEA’s website at www.ambleraccess.org, which website is not incorporated by reference.

Outlook

In 2017, we will continue to advance the development of our UKMP Projects. We are currently working on incorporating new surface mapping, a LiDAR survey, and drill hole information into an updated 3D geology model for the Arctic deposit. The new 3D geology model will update structural, lithology, mineralization and alteration domains into an integrated geology model that can support pre-feasibility level resource evaluations and mine planning. In the first quarter of 2017, we expect to complete a resource model update for the Arctic project that will include new assays collected from 2015 and 2016 drill core, specific gravity determinations collected from waste and mineralized material, and ABA static analyses collected from the hanging wall of the Arctic deposit – these data will support upgrading of Inferred resources to Measured and Indicated resource classification as well as future pre-feasibility level mine planning and open-pit design. During summer 2016, five drill holes were completed at the Arctic project to support a pre-feasibility level metallurgical test program. We retained ALS Metallurgy of Kamloops, British Columbia to complete the test work. The study will include confirmation of the metallurgical response of a Master Composite of approximately 400 kilograms, assessment of the variance in metallurgical responses across the deposit, and completion of copper-lead separation testing – work is on-going and expected to continue into the second quarter of 2017. We continue to advance our understanding of ABA/ML waste characterization at the Arctic project, in support of this task we plan to continue monthly sampling of laboratory Humidity Cell Tests through the end of 2017.

During summer 2013, two drill holes were completed in the open-pittable Ruby Creek zone of the Bornite deposit; the core was logged as per Company standard logging procedures, sampled and shipped to the Fairbanks warehouse where samples remained in cold storage pending processing. In September 2016, we retained SGS Minerals Services of Burnaby, British Columbia to perform a mineralogical and metallurgical test program for the retained samples of the open pit zone of the Bornite deposit. The study will include mineralogical characterization through quantitative analysis (QEMSCAN) and optimization of the metallurgical parameters to best recover the base and precious metal values in the mineralized material – work is on-going and expected to continue into the second quarter of 2017. In November 2016, we retained SRK Consulting of Vancouver, British Columbia to review hydrogeological conditions at the Bornite property, update the hydrogeological conceptual model and provide recommendations for future data collection – work is on-going and expected to continue into the second quarter of 2017.

In the first half of 2017, we expect to complete a number of stand-alone and district trade-off studies that will include updated information on the Arctic and Bornite projects. These trade-off studies will guide planning of future site investigations to support pre-feasibility.

We continue to work with NANA on workforce development within NANA’s region. Through the Oversight Committee and the Workforce Development sub-committee, NANA and the Company jointly work on programs to facilitate local hiring of NANA shareholders. The Company has contributed a total of $140,000 to a scholarship fund which grants awards to NANA shareholders for either (i) the recipient’s student expenses directly related to education, i.e., academic education at an accredited institution; or (ii) the recipient’s student expenses directly related to vocational or technical schooling or training at a recognized institution intended to qualify the recipient for enhanced employment opportunities. The Workforce Development sub-committee which consists of equal representation from NANA and the Company will review all applications for 2017 and will select recipients for grant awards. We are committed to training and hiring locally. We have been very successful in hiring NANA shareholders at the UKMP Projects, achieving over 50% local hire each year over the past 5 years. In 2016, our field season employees consisted of 55% NANA shareholders and in 2017, we are committed to the continuation of hiring locally at the project.

We are also working closely with AIDEA to amend the Memorandum of Understanding (“MOU”) , originally signed in 2013, as the industrial road route has been selected and permitting documents have been submitted to the relevant US federal agencies. We will work with AIDEA, as the proponent for the AMDIAP, to have a direct input into the permitting process for the road and have the ability to attend meetings with the BLM, as the lead federal agency for the EIS process.

Summary of results

#### in thousands of dollars,

#### except for per share amounts

| Selected expenses | Year ended November 30, 2016 $ | Year ended November 30, 2015 $ | Year ended November 30, 2014 $ |
| --- | ---: | ---: | ---: |
| General and administrative | 1,337 | 1,346 | 1,484 |
| Mineral properties expense | 5,037 | 4,167 | 2,512 |
| Professional fees | 442 | 1,346 | 952 |
| Salaries | 1,003 | 1,085 | 3,012 |
| Salaries – stock-based compensation | 615 | 831 | 887 |
| Loss from continued operations for the year | 8,712 | 9,134 | 9,648 |
| (Income)/loss from discontinued operations for the year | (3,850) | 398 | - |
| Loss and comprehensive loss for the year | 4,862 | 9,532 | 9,648 |
| Basic and diluted loss per common share | $0.05 | $0.12 | $0.17 |

For the year ended November 30, 2016, we reported a net loss of $4.9 million (or $0.05 basic and diluted loss per common share) compared to a net loss for the corresponding period in 2015 of $9.5 million (or $0.12 basic and diluted loss per common share) and a net loss of $9.6 million for the corresponding period in 2014 (or $0.17 basic and diluted loss per common share). This variance was primarily due to a one-time gain on the sale of Sunward Investments. Additionally, there were decreases in annual professional fees and stock-based compensation expense offset against an increase in mineral properties expenses in 2016.

The significant variance in 2016 relates to the gain recognized on the sale of Sunward Investments and the Titiribi Project of $4.4 million, pre-tax. This was a one-time event for which there is no comparable gain in prior years. Additionally, as a result of the sale, the operations of Sunward Investments were reclassified as a discontinued operation, retrospectively. Expenses of $0.6 million for the year ended November 30, 2016 and $0.4 million for the year ended November 30, 2015 related to the Sunward Investments operations were reclassified to discontinued operations. As Sunward was purchased by the Company in June 2015, there are no amounts prior to June 2015 included in the consolidated results. In addition to the gain recognized on the sale, we also realized $0.1 million in gains on the sale of investments received as consideration for the year ended November 30, 2016.

Professional fees for the year ended November 30, 2016 were $0.4 million, a reduction of $0.9 million from the $1.3 million incurred for the year ended November 30, 2015, and a reduction from the $1.0 million incurred for the year ended November 30, 2014. Expenses in 2016 were down significantly due to less corporate transaction activity as well as $0.2 million in costs related to the sale of Sunward recorded in discontinued operations. In 2015, expenses were incurred for legal and technical due diligence and regulatory approvals associated with the acquisition of Sunward and, in 2014, legal costs associated with private placement financing were incurred for which there is no comparable amount in the current year.

The variance in the mineral properties expense was primarily due to the differing magnitude of the field programs at our UKMP Project in 2016, 2015 and 2014. In 2016, we completed a similar-sized drill program consisting of 3,058 meters at the Arctic Project, however, we significantly increased the environmental baseline data collection and engineering site investigations compared to the 2015 program. In 2015, we completed fourteen diamond drill holes amounting to 3,056 meters at the Arctic Project, as well as engineering and environmental site investigations. In 2014, we completed a re-sampling and re-assaying program of approximately 13,000 meters of historical drill core from Bornite. Mineral property expenses consist of direct drilling, personnel, community, resource reporting and other exploration expenses, as well as indirect project support expenses such as fixed wing charters, helicopter support, fuel, and other camp operation costs.

The other reduction in expenses is from a charge of $0.6 million in stock-based compensation in 2016 compared to $0.8 million in 2015, and $0.9 million in 2014. The expense recognized for the current year includes $0.4 million in expense relating to stock options and $0.3 million in expense relating to RSUs and deferred share units (“DSUs”). The 2015 expense included $0.7 million in expense relating to stock options and $0.1 million in expense relating to DSUs issued to non-executive directors in lieu of cash remuneration. The expense recognized for 2014 included $0.5 million in expense relating to stock options and $0.4 million in expense relating to previously granted RSUs and DSUs.

Other important variances for the year ended November 30, 2016 compared to the same period in 2015 and 2014 are as follows: (a) $1.3 million in general and administrative expenses in 2016 and 2015 compared to $1.5 million in due to cost reduction efforts as well as a favorable foreign exchange movement; and (b) $1.0 million in salaries in 2016 compared to $1.1 million in 2015 and $3.0 million in 2014 primarily related to cost reduction initiatives implemented in the third quarter of 2014 that reduced the number of employees in the corporate office. The salaries in 2014 also included a one-time severance cost of $1.3 million paid to former employees offset by a recovery of $0.3 million due to a reversal of accrued bonuses from 2013 to employees no longer eligible to receive payment.

The comparable basic and diluted loss per common share for 2016 is lower than 2015 and 2014 due to the gain on the sale of Sunward Investments. The 2015 basic and diluted loss per common share is lower than 2014 mainly as a result of the additional shares issued during 2015 as a result of the Sunward acquisition completed in June 2015 as well as a lower loss figure.

Fourth quarter results

During the fourth quarter of 2016, we earned income of $2.0 million compared to a net loss of $2.1 million for the comparable period in 2015. The earnings in the fourth quarter of 2016 were due to the gain on sale of Sunward Investments of $4.4 million offsetting net expenses of $2.4 million. We incurred $1.4 million of mineral property expenses in the fourth quarter of 2016 compared to $0.8 million in the fourth quarter of 2015 for fairly comparable expenses including assaying costs from the summer drill program and engineering costs for the Arctic deposit. We recognized $0.2 million in foreign exchange losses in the fourth quarter of 2016 mainly due to the movement of the Canadian dollar as a result of holding the investments in BRI. As we acquired the investments in the fourth quarter of 2016, there is no comparable amount in 2015.

Selected financial data

Annual information

The following annual information is prepared in accordance with U.S. GAAP.

#### in thousands of dollars

|  | Year ended November 30, 2016 $ | Year ended November 30, 2015 $ | Year ended November 30, 2014 $ |
| --- | ---: | ---: | ---: |
| Interest income | 61 | 24 | 2 |
| Expenses | 8,918 | 9,158 | 9,650 |
| (Income)/Loss from discontinued operations for the year | (3,850) | 398 | - |
| Loss and comprehensive loss for the year | 4,862 | 9,532 | 9,648 |
| Total assets | 46,747 | 51,181 | 36,826 |
| Total liabilities | 593 | 751 | 979 |

Quarterly information

#### in thousands of dollars,

#### except per share amounts

|  | Q4 2016 11/30/16 $ | Q3 2016 08/31/16 $ | Q2 2016 05/31/16 $ | Q1 2016 02/28/16 $ | Q4 2015 11/30/15 $ | Q3 2015 08/31/15 $ | Q2 2015 05/31/15 $ | Q1 2015 02/28/15 $ |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Interest and other income | **10** | 15 | 18 | 18 | 12 | 8 | 4 | - |
| Mineral property expenses | **1,430** | 2,617 | 458 | 532 | 779 | 2,771 | 291 | 327 |
| Income (loss) from discontinued operations for the period | **4,561** | (352) | (187) | (172) | (200) | (198) | - | - |
| Earnings (loss) for the period | **2,025** | (3,544) | (1,648) | (1,695) | (2,090) | (4,162) | (1,750) | (1,530) |
| Earnings (loss) per common share – basic and diluted | **0.02** | (0.03) | (0.02) | $(0.02) | (0.02) | (0.04) | (0.03) | (0.03) |

74

Factors that can cause fluctuations in our quarterly results include the length of the exploration field season at the properties, the type of program conducted, stock option vesting, and issuance of shares. Other factors that have caused fluctuations in the quarterly results that would not be expected to re-occur include the acquisition and disposition of Sunward and financing activities.

Our loss for the first quarter ended February 28, 2015 was significantly reduced in comparison to previous first quarter periods due to the Company’s cost cutting efforts to reduce professional fees, salaries and mineral property expenses. During the first quarter of 2015, we incurred mineral property expense of $0.3 million mainly on community support and project staff salaries as our field season this year did not commence until early in the third quarter. During the second quarter of 2015, we incurred $0.3 million in mineral property expenses, the same level of activities as the first quarter of 2015. We also incurred $0.7 million in professional fees during the second quarter of 2015 mainly due to the acquisition of Sunward. During the third quarter of 2015, we incurred mineral property expenses of $2.8 million as we completed our drilling program. We also incurred $0.2 million of discontinued operation costs operating Sunward. As a result, our loss for the third quarter ended August 31, 2015 is higher compared to previous quarter losses. Our net loss for the fourth quarter of 2015 of $2.1 million consists of $0.8 million in mineral property expenses incurred for assay costs and engineering studies conducted in the fall as well as $0.2 million in discontinued operation costs from Sunward.

Our loss for the first quarter ended February 28, 2016 is slightly increased compared to the first quarter ended February 28, 2015 due to increased mineral property expenses relating to engineering studies completed in advance of the 2016 field program, as well as costs related to operating Sunward. During the second quarter of 2016, we incurred $0.5 million in mineral property expenses due to field season starting up in the last month of the second quarter and $0.2 million in discontinued operations relating to Sunward. During the third quarter of 2016, we incurred mineral property expenses of $2.6 million as we completed our drilling program. As a result, our loss for the third quarter ended August 31, 2016 is higher compared to previous third quarter losses. We recognized earnings for the fourth quarter of 2016 of $2.0 million due to the gain on the sale of Sunward. Adjusted for the discontinued operations, the fourth quarter periods are comparable.

Liquidity and capital resources

At November 30, 2016, we had $7.3 million in cash and cash equivalents. We expended $8.9 million on operating activities during the 2016 fiscal year compared with $8.4 million for operating activities for the same period in 2015, and expenditures of $8.6 million for operating activities for the same period in 2014. A majority of cash spent on operating activities during all periods was expended on mineral property expenses, professional fees, salaries and general and administrative expenses. The increase in cash spent in the year ended November 30, 2016 is mainly due to increased mineral property expenses of $0.9 million, increased discontinued operations expense of $0.2 million expended on Sunward offset by decreased professional fees of $0.9 million. As at November 30, 2016, the Company continues to manage its cash expenditures and management believes that the working capital available is sufficient to meet its operational requirements for the next year. Future financings are anticipated through equity financing, debt financing, the sale of investments, convertible debt, or other means.

During the year ended November 30, 2014, we raised $7.2 million in proceeds from the completion of a private placement in July 2014. There was no comparable amount from financing activities in 2015 or 2016.

During the year ended November 30, 2016, we raised $0.2 million in sales from investments acquired through the sale of Sunward Investments. During the year ended November 30, 2015, we generated $19.4 million from investing activities through the acquisition of Sunward. There was no comparable amount from investing activities in 2014. In 2014 and 2015, to conserve cash, our expenditures were minimal and limited to replacements that were absolutely necessary. In 2016, we spent $0.1 million purchasing vehicles and equipment to replace older vehicles.

Contractual obligations

Contractual obligated undiscounted cash flow requirements as at November 30, 2016 are as follows.

#### in thousands of dollars,

#### unless otherwise specified

|  | Total $ | \< 1 Year $ | 1–3 Years $ | 3–5 Years $ | \> 5 Years $ |
| --- | ---: | ---: | ---: | ---: | ---: |
| Accounts payable and accrued liabilities | 593 | 593 | - | - | - |
| Office lease | 75 | 75 | - | - | - |
| **Total** | **668** | **668** | **-** | **-** | - |

75

On January 25, 2013, the Company entered into a commitment to lease office space effective May 1, 2013 for a period of four years with a remaining total commitment at November 30, 2016 of $0.08 million.

Off-balance sheet arrangements

We have no material off-balance sheet arrangements. The Company has lease commitments for office spaces with a remaining total commitment of $0.08 million.

Outstanding share data

At February 2, 2017, we had 105,501,761 common shares issued and outstanding. At February 2, 2017, we had outstanding 6,521,740 warrants with an exercise price of $1.60 each, 7,562,765 stock options with a weighted-average exercise price of $0.53, 958,648 DSUs, 600,002 RSUs, 66,664 NovaGold Arrangement Options with a weighted-average exercise price of $3.91, and 20,685 NovaGold DSUs for which the holder is entitled to receive one common share for every six NovaGold shares received. For additional information on NovaGold Arrangement Options and NovaGold DSUs, please refer to note 8 in our November 30, 2016 audited consolidated financial statements. Upon exercising all of forgoing convertible securities, the Company would be required to issue an aggregate of 15,713,266 common shares.

Financial instruments

Our financial instruments consist of cash and cash equivalents, accounts receivable, deposits, investments, and accounts payable and accrued liabilities. The fair value of the financial instruments approximates their carrying value due to the short-term nature of their maturity. Our financial instruments initially measured at fair value and then held at amortized cost include cash and cash equivalents, accounts receivable, deposits, and accounts payable and accrued liabilities. Our investments are held for trading and are marked-to-market at each period end with changes in fair value recorded to the statement of loss.

(a) Currency risk

Currency risk is the risk of a fluctuation in financial asset and liability settlement amounts due to a change in foreign exchange rates. We operate in the United States, Canada, and previously operated in Colombia with some expenses incurred in Canadian dollars and Colombian pesos. Our exposure to currency risk at November 30, 2016 is limited to the Canadian dollar consisting of cash of CDN$451,000, accounts receivable of CDN$32,000, deposits amounts of CDN$146,000, investments of CDN$10,521,000 and accounts payable of CDN$528,000. Based on a 1% change in the US-Canadian exchange rate, assuming all other variables remain constant, the Company’s net loss would change by approximately $79,000.

(b) Credit risk

Credit risk is the risk of an unexpected loss if a customer or third party to a financial instrument fails to meet its contractual obligations. The Company holds cash and cash equivalents with Canadian Chartered financial institutions. The Company’s accounts receivable consist of GST receivable from the Federal Government of Canada and other receivables for recoverable expenses. The Company’s exposure to credit risk is equal to the balance of cash and cash equivalents and accounts receivable as recorded in the financial statements.

(c) Liquidity risk

Liquidity risk is the risk that we will encounter difficulties raising funds to meet our financial obligations as they fall due. The Company does not have cash inflows from operations; therefore, the Company manages liquidity risk through the management of our capital structure and financial leverage. Future financings may be obtained through debt financing, equity financing, sales of investments, convertible debt, exercise of options, or other means. Continued operations are dependent on our ability to obtain additional financing or to generate future cash flows. Our contractually obligated cash flow is disclosed under the section titled “Liquidity and capital resources.”

(d) Interest rate risk

Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates. The Company is exposed to interest rate risk with respect to interest earned on cash and cash equivalents. Based on balances as at November 30, 2016, a 1% change in interest rates would result in a change in net loss of $0.1 million, assuming all other variables remain constant.

As we are currently in the exploration phase none of our financial instruments are exposed to commodity price risk; however, our ability to obtain long-term financing and its economic viability could be affected by commodity price volatility.

New accounting pronouncements

Certain recent accounting pronouncements have been included under note 2 in our November 30, 2016 audited consolidated financial statements

Critical accounting estimates

The most critical accounting estimates upon which our financial status depends are those requiring estimates of the recoverability of our capitalized mineral properties, impairment of long-lived assets, accounting for business combinations, income taxes and valuation of stock-based compensation.

Mineral properties and development costs

All direct costs related to the acquisition of mineral property interests are capitalized. The acquisition of title to mineral properties is a complicated and uncertain process. The Company has taken steps, in accordance with industry standards, to verify the title to mineral properties in which it has an interest. Although the Company has made efforts to ensure that legal title to its mining assets is properly recorded, there can be no assurance that such title will be secured indefinitely.

Impairment of long-lived assets

Management assesses the possibility of impairment in the carrying value of its long-lived assets whenever events or circumstances indicate that the carrying amounts of the asset or asset group may not be recoverable. Significant judgments are made in assessing the possibility of impairment. Management considers several factors in considering if an indicator of impairment has occurred, including but not limited to, indications of value from external sources, significant changes in the legal, business or regulatory environment, and adverse changes in the use of physical condition of the asset. These factors are subjective and require consideration at each period end. If an indicator of impairment is determined to exist, management calculates the estimated undiscounted future net cash flows relating to the asset or asset group using estimated future prices, mineral resources, and operating, capital and reclamation costs. When the carrying value of an asset exceeds the related undiscounted cash flows, the asset is written down to its estimated fair value, which is usually determined using discounted future cash flows. Management’s estimates of mineral prices, mineral resources, foreign exchange rates, production levels and operating capital and reclamation costs are subject to risk and uncertainties that may affect the determination of the recoverability of the long-lived asset.

Income taxes

We must make estimates and judgments in determining the provision for income tax expense, deferred tax assets and liabilities, and liabilities for unrecognized tax benefits including interest and penalties. We are subject to income tax law in the United States, Canada and previously in Colombia. The evaluation of tax liabilities involving uncertainties in the application of complex tax regulation is based on factors such as changes in facts or circumstances, changes in tax law, new audit activity, and effectively settled issues. The evaluation of an uncertain tax position requires significant judgment, and a change in such recognition would result in an additional charge to the income tax expense and liability.

Stock-based compensation

Compensation expense for options granted to employees, directors and certain service providers is determined based on estimated fair values of the options at the time of grant using the Black-Scholes option pricing model, which takes into account, as of the grant date, the fair market value of the shares, expected volatility, expected life, expected forfeiture rate, expected dividend yield and the risk-free interest rate over the expected life of the option. The use of the Black-Scholes option pricing model requires input estimation of the expected life of the option, volatility, and forfeiture rate which can have a significant impact on the valuation model, and resulting expense recorded.

Disclosure controls and procedures

Disclosure controls and procedures are designed to ensure that information required to be disclosed in reports filed or submitted by the Company under U.S. and Canadian securities legislation is recorded, processed, summarized and reported within the time periods specified in those rules, including providing reasonable assurance that material information is gathered and reported to senior management, including the Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), as appropriate, to permit timely decisions regarding public disclosure. Management, including the CEO and CFO, has evaluated the effectiveness of the design and operation of the Company’s disclosure controls and procedures, as defined in Rule 13a-15(e) and 15d-15(e) of the US Exchange Act and the rules of Canadian Securities Administration, as at November 30, 2016. Based on this evaluation, the CEO and CFO have concluded that the Company’s disclosure controls and procedures were effective.

Internal control over financial reporting

Management is responsible for establishing and maintaining adequate internal control over financial reporting as defined in Rule 13a-15(f) and 15d-15(f) of the U.S. Exchange Act and National Instrument 52-109 Certification of Disclosure in Issuer’s Annual and Interim filings. Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation. Management has used the Committee of Sponsoring Organizations of the Treadway Commission in Internal Control – Integrated Framework (2013) to evaluate the effectiveness of the Company’s internal control over financial reporting. Based on this assessment, management has concluded that as at November 30, 2016, the Company’s internal control over financial reporting was effective.

Risk factors

Trilogy and its future business, operations and financial condition are subject to various risks and uncertainties due to the nature of its business and the present stage of exploration of its mineral properties. Certain of these risks and uncertainties are under the heading “Risk Factors” under Trilogy’s Form 10-K dated February 2, 2017 available on SEDAR at www.sedar.com and EDGAR at www.sec.gov and on our website at www.trilogymetals.com.

Additional information

Additional information regarding the Company, including our annual report on Form 10-K, is available on SEDAR at www.sedar.com and EDGAR at www.sec.gov and on our website at www.trilogymetals.com.

## Controls and procedures

As filed, 2,718 characters.

Disclosure Controls and Procedures

Disclosure controls and procedures are designed to ensure that information required to be disclosed in reports filed or submitted by the Company under U.S. and Canadian securities legislation is recorded, processed, summarized and reported within the time periods specified in those rules, including providing reasonable assurance that material information is gathered and reported to senior management, including the Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), as appropriate, to permit timely decisions regarding public disclosure. Management, including the CEO and CFO, has evaluated the effectiveness of the design and operation of the Company’s disclosure controls and procedures, as defined in Rule 13a-15(e) and15d-15(e) of the Exchange Act and the rules of Canadian Securities Administration, as at November 30, 2016. Based on this evaluation, the CEO and CFO have concluded that the Company’s disclosure controls and procedures were effective.

Internal Control over Financial Reporting

Management is responsible for establishing and maintaining adequate internal control over financial reporting as defined in Rule 13a-15(f) and 15d-15(f) of the Exchange Act and National Instrument 52-109 Certification of Disclosure in Issuer’s Annual and Interim filings. Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation. Management has used the Committee of Sponsoring Organizations of the Treadway Commission in Internal Control – Integrated Framework (2013) to evaluate the effectiveness of the Company’s internal control over financial reporting. Based on this assessment, management has concluded that as at November 30, 2016, the Company’s internal control over financial reporting was effective.

Attestation Report of the Registered Public Accounting Firm

This annual report does not include an attestation report of the company’s registered public accounting firm regarding internal control over financial reporting. As a smaller reporting company, management’s report was not subject to attestation by the company’s registered public accounting firm pursuant to Dodd-Frank, which exempts smaller reporting companies from complying with Section 404(b) of SOX.

Changes in Internal Controls

There has been no change in our internal control over financial reporting during the year ended November 30, 2016 that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

Filed Feb 3, 2017.
Source: SEC EDGAR, the filing index for accession 0001279569-17-000161. Last ingested by Listed: Nov 10, 2026, 16:29 ET. No prices; not investment advice.