# International Tower Hill Mines Ltd: Form 10-K for the period ended Dec 31, 2016

- Company: [International Tower Hill Mines Ltd](/companies/thm.md) (CIK 1134115)
- Form: 10-K
- Filed: 2017-03-15
- Accepted by EDGAR: Mar 14, 2017, 20:13 ET
- Period: 2016-12-31
- Accession: 0001279569-17-000496
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1134115/000127956917000496/v461170_10k.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1134115/000127956917000496/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2016-12-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Income tax | 12 months, 2016-01-01 to 2016-12-31 | $0 | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 12 months, 2016-01-01 to 2016-12-31 | −$7.2m | us-gaap:NetIncomeLoss |
| Diluted EPS | 12 months, 2016-01-01 to 2016-12-31 | −$0.06 | us-gaap:EarningsPerShareBasicAndDiluted |
| Cash and equivalents | at 2016-12-31 | $22.5m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2016-12-31 | $22.7m | us-gaap:AssetsCurrent |
| Total assets | at 2016-12-31 | $77.9m | us-gaap:Assets |
| Current liabilities | at 2016-12-31 | $15.1m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2016-12-31 | $15.1m | us-gaap:Liabilities |
| Shareholders' equity | at 2016-12-31 | $62.8m | us-gaap:StockholdersEquity |

## Business

As filed, 18,121 characters.

### Overview

ITH is a mineral exploration company engaged in the acquisition and exploration of mineral properties. The Company currently holds or has the right to acquire interests in an advanced stage exploration project in Alaska referred to as the “Livengood Gold Project” or the “Project”. The Company is in the process of optimizing the Livengood Gold Project as discussed below. The Company has not yet begun preparation for the extraction of mineralization from the deposit or reached commercial production. The Company controls 100% of the Livengood Gold Project, which has a current (as at August 26, 2016) mineral resource of 497 million measured tonnes at an average grade of 0.68 g/tonne (10.84 million ounces), 28 million indicated tonnes at an average grade of 0.69 g/tonne (0.62 million ounces) and 53 million inferred tonnes at an average grade of 0.66 g/tonne (1.1 million ounces). In 2016 the Company issued the results of a pre-feasibility study that was summarized in the October 2016 Study which converted a portion of the mineral resources at the Project into proven reserves of 378 million tonnes at an average grade of 0.71 g/tonne (8.62 million ounces) and probable reserves of 14 million tonnes at an average grade of 0.72 g/tonne (353,000 ounces) based on a gold price of $1,250 per ounce. All work presently planned by the Company is directed at maintaining necessary environmental baseline activities at the Livengood Gold Project and focusing efforts on Project optimization opportunities, including those identified in the October 2016 Study. A more complete description of the Livengood Gold Project and the current activities is set forth in Part II, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, of this Annual Report on Form 10-K.

Since 2006, the Company has focused primarily on the acquisition and exploration of mineral properties in Alaska and Nevada by acquiring through staking, purchase, lease or option (primarily from AngloGold Ashanti (U.S.A.) Exploration Inc. (“AngloGold”) in a transaction which closed on August 4, 2006) interests in a number of mineral properties in Alaska (Livengood Gold Project, Terra, LMS, BMP, Chisna, Coffee Dome, West Tanana, Gilles, West Pogo, Caribou, Blackshell and South Estelle) and Nevada (North Bullfrog and Painted Hills) that it believed had the potential to host large precious or base metal deposits. Some of these, such as the Painted Hills, Gilles, West Tanana, Caribou and Blackshell properties, were, in light of disappointing exploration results, dropped or returned to the respective optionors or lessors, and the associated costs written off while others, such as the South Estelle property, have been sold. Since early 2008, the Company’s primary focus has been the exploration and advancement of the Livengood Gold Project and the majority of its resources have been directed to that end. In August 2010, ITH undertook a corporate spin-out arrangement transaction whereby all of its mineral property interests other than the Project were transferred to Corvus and Corvus was spun out as an independent and separate public company. Following the completion of that transaction, the sole mineral property held by the Company is the Livengood Gold Project. Since the completion of such transaction, the Company has focused exclusively on the ongoing exploration and potential development of the Livengood Gold Project.

The head office and principal administrative address of ITH is located at Suite 2300 – 1177 West Hastings Street, Vancouver, British Columbia, Canada V6E 2K3, and its registered and records office is located at 1300 – 777 Dunsmuir Street, Vancouver, BC V7Y 1K2.

### Recent Developments

#### Livengood Gold Project Developments

During the year ended December 31, 2016 and to the date of this Annual Report on Form 10-K, the Company progressed on a number of opportunities for optimization and reducing the estimated costs of building and operating a mine at the Project. Outside consultants were retained to conduct additional metallurgical tests and engineering, including confirmation of the flow sheet and optimizing the operating costs. These inputs were used to prepare the October 2016 Study, which evaluated several scenarios, ultimately selecting a project that will process 52,600 tons per day and produce 6.8 million ounces of gold over 23 years. This improved configuration has reduced the capital costs (“CAPEX”) by 34% or $950 million to $1.84 billion, the process operating cost (“process OPEX”) by 28% or $2.97 per ton to $7.48 per ton, and the all-in costs to $1,247 per ounce, all as compared to the 100,000 tons per day project evaluated in the September 2013 Feasibility Study.

#### Financing

On December 28, 2016, the Company closed a non-brokered private placement financing through the issuance of 45,833,334 common shares issued at $0.48 per share for gross proceeds of $22.0 million. Total share issuance costs for this non-brokered private placement financing amounted to $146,735. The Company has used $14.7 million of the net proceeds for the final payment with respect to acquisition of certain mining claims and related rights in the vicinity of the Livengood Gold Project, with the balance to be used for continuation of optimization studies to further improve and de-risk the Project, required environmental baseline studies, and for general working capital purposes.

#### Management Changes

On January 23, 2017, the ITH Board approved a management transition plan, which was implemented on January 31, 2017, in which Karl Hanneman, currently the Chief Operating Officer (COO), became the Chief Executive Officer (CEO), managing both the CEO and COO responsibilities, and Tom Irwin, the previous CEO, transitioned into a part-time position of Senior Advisor prior to his being considered for nomination to the Board at the Company's May 2017 Annual General Meeting (AGM).

#### Appointment of Directors

On December 28, 2016, Marcelo Kim was appointed as an additional director of ITH, and as the Chair of the Board. Mr. Kim is a Partner at Paulson & Co. Inc., the Company’s major shareholder, where he oversees global natural resource investments. Commencing from the 2017 AGM of the Company’s shareholders, Paulson & Co. Inc. will have the right to nominate Mr. Kim and one other individual to stand for election to the Board. Steve Lang, who has served as the Board Chair since January 2014, was appointed as the lead independent director for the Company upon the appointment of Mr. Kim as Chair.

#### Other Developments

On January 12, 2017, the Company paid $14.7 million for the timely and full satisfaction of the final derivative payment due with respect to acquisition of certain mining claims and related rights in the vicinity of the Livengood Gold Project. On January 17, 2017, the Full Deed of Reconveyance releasing the Deed of Trust on the acquired property was recorded and the Company now fully owns this property and has no further liability with respect to this acquisition.

### 2017 Outlook

On January 23, 2017 the Board approved a 2017 budget of $6.3 million. The work program incorporated in this budget will seek to build upon the Project improvements announced with the October 2016 Study, focusing on improving the mineralization and alteration models used to support the resource block model, evaluating alternative block models for production schedule opportunities, and completion of several phases of metallurgical work to better define and optimize the flowsheet and recovery parameters. The 2017 work program has been specifically designed to target those aspects of the Project that could deliver the highest NPV increase for the least expenditure. Preliminary work on the block model and metallurgical recovery variability indicates a potential NPV benefit of up to $280 million and $100 million respectively (see section below 2017 Work Program Details). The engineering firm of BBA Inc. (BBA), who provided support for the 2016 Pre-feasibility Study (the “2016 PFS”), will be retained to continue work in the 2017 program. Work is also planned to advance the environmental baseline efforts needed to support future permitting.

**However, the Company cautions that, until this multi-phase metallurgical program and the updated block model are completed and the results thereof are incorporated into a revised financial model, there can be no assurance that the overall recovery increases, potential process optimizations, or block model improvements, will, in fact, be realized, or that any such increases, optimizations or improvements will have the overall effect suggested above.**

The Company remains open to a strategic alliance to help support the future development of the Project while considering all other appropriate financing options. The size of the gold resource, the favorable location, and the proven team are some of the reasons the Company would potentially attract a strategic partner with a long term development horizon who understands the Project is highly leveraged to gold prices.

### Regulatory, Environmental and Social Matters

All of the Company’s currently proposed exploration is under the jurisdiction of the State of Alaska. In Alaska, low impact, initial stage surface exploration such as stream sediment, soil and rock chip sampling does not require any permits. The State of Alaska requires an APMA (Alaska Placer Mining Application) exploration permit for all substantial surface disturbances such as trenching, road building and drilling. These permits are also reviewed by related state and federal agencies that can comment and require specific changes to the proposed work plans to minimize impacts on the environment. The permitting process for significant disturbances generally requires 30 days for processing and all work must be bonded. The Company currently has all necessary permits with respect to its currently planned exploration activities in Alaska. Although the Company has never had an issue with the timely processing of APMA permits, there can be no assurances that delays in permit approval will not occur.

ITH has created a Technical Committee, which has adopted a formal, written charter. As set out in its charter, the overall purpose of the Technical Committee is to assist the Board in fulfilling its oversight responsibilities with respect to the Company’s continuing commitment to improving the environment and ensuring that activities are carried out and facilities are operated and maintained in a safe and environmentally sound manner that reflects the ideals and principles of sustainable development. The primary function of the Technical Committee is to monitor, review and provide oversight with respect to the technical aspects of the Company’s projects as well as monitor policies, standards, accountabilities and programs relative to health, safety, community relations and environmental-related matters. The Technical Committee also advises the Board and makes recommendations for the Board’s consideration regarding health, safety, community relations and environmental-related issues.

Although not set out in a specific policy, the Company strives to be a positive influence in the local communities where its mineral projects are located, not only by contributing to the welfare of such communities through donations of money and supplies, as appropriate, but also through hiring, when appropriate, local workers to assist in ongoing exploration programs. The Company considers building and maintaining strong relationships with such communities to be fundamental to its ability to continue to operate in such regions and to assist in the eventual development (if any) of mining operations in such regions, and it attaches considerable importance to commencing and fostering such relationships from the beginning of its involvement in any particular area.

### Corporate Structure

ITH was incorporated under the *Company Act* (British Columbia) under the name “Ashnola Mining Company Ltd.” on May 26, 1978. ITH’s name was changed to “Tower Hill Mines Ltd.” on June 1, 1988, and subsequently changed to “International Tower Hill Mines Ltd.” on March 15, 1991. ITH has been transitioned under, and is now governed by, the *Business Corporations Act* (British Columbia). On November 15, 2005, the shareholders resolved to amend the Company’s Articles to increase its authorized capital from 20,000,000 common shares without par value to 500,000,000 common shares without par value. This increase became effective on April 20, 2006.

ITH has three material subsidiaries:

- Tower Hill Mines, Inc. (“TH Alaska”), a corporation incorporated in Alaska on June 27, 2006, which holds most of the Company’s Alaskan mineral properties and is 100% owned by ITH;
- Tower Hill Mines (US) LLC, a limited liability company formed in Colorado on June 27, 2006, which carries on the Company’s administrative and personnel functions and is wholly owned by TH Alaska; and
- Livengood Placers, Inc., a corporation incorporated in Nevada on June 11, 1998, which holds certain Alaskan properties and is 100% owned by TH Alaska.

The following corporate chart sets forth all of ITH’s material subsidiaries:

### Segment and Geographical Information

The Company operates in a single reportable operating segment, being the exploration and development of mineral properties. The Company’s long-lived assets are geographically distributed as shown in the following table. The Company did not have revenues from external customers in any of the years shown below.

|  | December 31, 2016 | December 31, 2015 | December 31, 2014 |
| --- | ---: | ---: | ---: |
| Canada: | $8,944 | $9,563 | $10,477 |
| United States: | 55,219,897 | 55,224,561 | 55,230,692 |
| Total: | $55,228,841 | $55,234,124 | $55,241,169 |

### Competition

ITH is an exploration stage company. The Company competes with other mineral resource exploration and development companies for financing, technical expertise and the acquisition of mineral properties. Many of the companies with whom the Company competes have greater financial and technical resources. Accordingly, these competitors may be able to spend greater amounts on the acquisition, exploration and development of mineral properties. This competition could adversely impact the Company’s ability to finance further exploration and to achieve the financing necessary for the Company to develop its mineral properties.

### Availability of Raw Materials and Skilled Employees

All aspects of the Company’s business require specialized skills and knowledge. Such skills and knowledge include the areas of geology, drilling, logistical planning, preparation of feasibility studies, permitting, construction and operation of a mine, financing and accounting. Since commencing its current operations in mid-2006, the Company has found and retained appropriate employees and consultants and believes it will continue to be able to do so.

All of the raw materials the Company requires to carry on its business are readily available through normal supply or business contracting channels in Canada and the United States. Since commencing exploration activities at the Livengood Gold Project in mid-2006, the Company has been able to secure the appropriate personnel, equipment and supplies required to conduct its contemplated programs. While it has experienced difficulty in procuring some equipment, such as drill equipment or services, experienced drillers and timely assay laboratory services in previous years, the recent overall slowdown in the mineral exploration business has resulted in more equipment and services being made available on a timely basis. As a result, the Company does not believe that it will experience any shortages of required personnel, equipment or supplies in the foreseeable future.

### Employees

At December 31, 2016, the Company had 10 full-time employees. The Company also uses consultants with specific skills to assist with various aspects of project evaluation, engineering and corporate governance.

### Seasonality

As the Company’s mineral exploration activity takes place in Alaska, its business is seasonal. Due to the northern climate, exploration work on the Livengood Gold Project can be limited due to excessive snow cover and cold temperatures. In general, surface sampling work is limited to May through September and surface drilling from March through November, although some locations afford opportunities for year-round exploration operations and others, such as road-accessible wetland areas, may only be explored while frozen in the winter.

### Available Information

ITH maintains an internet website at www.ithmines.com. The Company makes available, free of charge, through the Investors section of its website, its Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, and all amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act, as soon as reasonably practicable after such material is electronically filed with, or furnished to, the SEC and its Annual Information Form, press releases and material change reports and other reports filed on the System for Electronic Document Analysis and Retrieval (SEDAR). The Company’s SEC filings are available from the SEC’s internet website at www.sec.gov which contains reports, proxy and information statements and other information regarding issuers that file electronically. These reports, proxy statements and other information may also be inspected and copied at the SEC’s Public Reference Room at 100 F Street, NE, Washington, D.C. 20549. Please call the SEC at 1-800-SEC-0330 for further information on the operation of the Public Reference Room. The Company’s SEDAR filings are available from SEDAR’s internet website at www.sedar.com under the Company’s profile. The contents of these websites are not incorporated into this report and the references to the URLs for these websites are intended to be inactive textual references only.

## Risk factors

As filed, 53,067 characters.

*You should carefully consider the following risk factors in addition to the other information included in this Annual Report on Form 10-K. Each of these risk factors could materially and adversely affect our business, operating results and financial condition, as well as materially and adversely affect the value of an investment in our common shares. The risks described below are not the only ones facing the Company. Additional risks that we are not presently aware of, or that we currently believe are immaterial, may also adversely affect our business, operating results and financial condition. We cannot assure you that we will successfully address these risks or that other unknown risks exist that may affect our business.*

### Risks Related to Our Business

***Our success depends on the development and operation of the Livengood Gold Project, which is our only project and which, as contemplated in the October 2016 Study, is not commercially viable at current gold prices.***

Our only property at this time is our Livengood Gold Project, which is in the exploration stage. We have issued the October 2016 Study on the Livengood Gold Project which indicates that the Project generates a minimal positive return at a gold price of $1,250 per ounce. The price of gold is $1,204 per ounce as of March 13, 2017, and the Project as contemplated in the October 2016 Study is not commercially viable at current gold prices. While management is exploring opportunities identified in the October 2016 Study, for optimization and reducing Project costs, there can be no assurance that any such efforts will be successful, that any of the optimization opportunities or cost savings will in fact be realized or that the price of gold will increase sufficiently to warrant a decision to develop the Project. If the Project is not developed, or if the Project is otherwise subject to deterioration, destruction or significant delay, we may never generate revenues and our shareholders may lose most or all of their investment in our common shares.

***While we may be successful in outlining potential optimizations that might improve the economics of the Project, there can be no assurance that any such optimizations can actually be incorporated into the Project.***

While a review of the pre-feasibility test work to date on the Project indicates that there is the potential to further optimize the specific parameters of the Project, and that such optimizations may result in lower capital costs and operating costs for the Project, there can be no assurance that, even if such optimizations can be achieved and shown to have such effect, it will be possible to actually change the scope, size, scale and parameters of any revised Project configuration to actually incorporate the optimized results. Even if such optimization testwork shows that optimization will improve capital or operating costs for the Project, it may not be possible to re-scale the Project so as to take advantage of all or any part of the optimized processes and therefore it may not be possible, in fact, to derive any benefit from the optimization work or studies carried out.

***We have a history of losses and expect to continue to incur losses in the future.***

We have incurred losses and have had no revenue from operations since inception, and we expect to continue to incur losses in the future. We have not commenced commercial production on the Livengood Gold Project and we have no other mineral properties. We have no revenues from operations, and we anticipate we will have no operating revenues and will continue to incur operating losses until such time, if ever, as we place the Livengood Gold Project into production and such project generates sufficient revenues to fund continuing operations. The Project is currently in the exploration stage and, as contemplated in the October 2016 Study, is not commercially viable at current gold prices. Our activities may not result in profitable mining operations and we may not succeed in establishing mining operations or profitably producing metals at the Livengood Gold Project.

***We are an exploration stage company and have no history producing metals from our properties. Any future revenues and profits are uncertain.***

We have no history of mining or refining any mineral products or metals and the Livengood Gold Project is not currently producing. There can be no assurance that the Livengood Gold Project will be successfully placed into production, produce minerals in commercial quantities or otherwise generate operating earnings. Advancing properties from the exploration stage into development and commercial production requires significant capital and time and will be subject to further feasibility studies, permitting requirements and construction of the mine, processing plants, roads and related works and infrastructure. We will continue to incur losses until such time, if ever, as our mining activities successfully reach commercial production levels and generate sufficient revenue to fund continuing operations. There is no certainty that we will produce revenue from any source, operate profitably or provide a return on investment in the future. If we are unable to generate revenues or profits, our shareholders might not be able to realize returns on their investment in our common shares.

***We will require additional financing to fund exploration and, if warranted, development and production. Failure to obtain additional financing could have a material adverse effect on our financial condition and results of operation and could cast uncertainty on our ability to continue as a going concern.***

Advancing properties from exploration into the development stage requires significant capital and time, and successful commercial production from a property, if any, will be subject to completing feasibility studies, permitting and construction of the mine, processing plants, roads, and other related works and infrastructure. The Company does not presently have sufficient financial resources or a source of operating cash flow to undertake by itself to complete the permitting process and, if a production decision is made, the construction of a mine at the Livengood Gold Project. The completion of the permitting process, and any construction of a mine at the Livengood Gold Project following the making of a production decision, will therefore depend upon the Company’s ability to obtain financing through the sale of its equity securities, enter into a joint venture or strategic alliance relationship, secure significant debt financing or find alternative means of financing. There is no assurance that the Company will be successful in obtaining the required financing on favorable terms or at all. Even if the results of exploration are encouraging, the Company may not be able to obtain sufficient financing to conduct the further exploration that may be necessary to determine whether or not a commercially mineable deposit exists.

Our ability to obtain additional financing in the future will depend upon a number of factors, including prevailing capital market conditions, the status of the national and worldwide economy, our business performance and the price of gold and other precious metals. Capital markets worldwide have been adversely affected in recent years by substantial losses by financial institutions. Failure to obtain such additional financing on favorable terms or at all could result in delay or indefinite postponement of further mining operations or exploration and development and the possible partial or total loss of our interests in the Livengood Gold Project.

***We have not yet identified, and may never identify, commercially viable reserves that would generate revenues.***

We are considered an exploration stage company and will continue to be such until we identify commercially viable reserves on our properties and develop our properties. We have no producing properties and have never generated any revenue from our operations. We have issued the October 2016 Study using a gold price of $1,250 per ounce. Based on the October 2016 Study, the Project generates a minimal positive return; however, the Project is not commercially viable at current gold prices. The majority of exploration projects do not result in the discovery of commercially mineable deposits of ore. Further exploration and substantial expenditures are required to establish ore reserves through drilling and metallurgical and other testing techniques, determine metal content and metallurgical recovery processes to extract metal from the ore, and construct, renovate or expand mining and processing facilities. No assurance can be given that any level of recovery of ore reserves will be realized or that any identified mineral deposit will ever qualify as a commercial mineable ore body which can be legally and economically exploited. If we are not able to identify commercially viable mineral deposits or profitably extract minerals from such deposits, our business would be materially adversely affected and our shareholders could lose all or a substantial portion of their investment.

***Resource exploration is a highly speculative business, and certain inherent exploration risks could have a negative effect on our business.***

Our long-term success depends on our ability to identify mineral deposits on the Livengood Gold Project and other properties we may acquire, if any, that can then be developed into commercially viable mining operations. Resource exploration is a highly speculative business and involves a high degree of risk, including, among other things, unprofitable efforts resulting both from the failure to discover mineral deposits and from finding mineral deposits which, though present, are insufficient in size and grade at the then prevailing market conditions to return a profit from production. Substantial expenditures are required to establish proven and probable mineral reserves through drilling and analysis, to develop metallurgical processes to extract metal, and to develop the mining and processing facilities and infrastructure at any site chosen for mining. Although substantial benefits may be derived from the discovery of a major mineralized deposit, no assurance can be given that minerals will be discovered in sufficient quantities to justify commercial operations or that funds required for development can be obtained on a timely basis. The marketability of minerals which may be acquired or discovered by the Company will be affected by numerous factors beyond the control of the Company and cannot be accurately predicted. These factors include market fluctuations, the proximity and capacity of milling facilities, mineral markets and processing equipment, and government regulations, including regulations relating to prices, taxes, royalties, land use, importing and exporting of minerals and environmental protection. The exact effect of these factors cannot be accurately predicted, but the combination of these factors may result in the Company not receiving an adequate return on invested capital.

***Mineral resource estimates are based on interpretation and assumptions and could be inaccurate or yield less mineral production under actual conditions than is currently estimated. Any material changes in these estimates will affect the economic viability of placing a property into production.***

The mineral resource estimates included in our reports are estimates only and no assurance can be given that any particular level of recovery of minerals will in fact be realized or that an identified reserve or resource will ever qualify as a commercially mineable (or viable) deposit which can be legally and economically exploited. The estimating of mineral resources and mineral reserves is a subjective process and the accuracy of mineral resource and mineral reserve estimates is a function of the quantity and quality of available data, the accuracy of statistical computations, and the assumptions used and judgments made in interpreting available engineering and geological information. There is significant uncertainty in any mineral resource or mineral reserve estimate and the actual deposits encountered and the economic viability of a deposit may differ materially from the Company’s estimates. In addition, the grade of mineralization ultimately mined may differ from that indicated by drilling results and such differences could be material. Because we have not commenced actual production, mineralization estimates, including mineral resource estimates, for the Livengood Gold Project may require adjustments or downward revisions, and such adjustments or revisions may be material.

Until ore is actually mined and processed, mineral resources, mineral reserves and grades of mineralization must be considered as estimates only. The grade of ore ultimately mined, if any, may differ from that indicated by any pre-feasibility or definitive feasibility studies and drill results. There can be no assurance that minerals recovered in small scale laboratory tests will be duplicated in large scale tests under on-site conditions or in production scale operations. Extended declines in market prices for gold may render portions or all of our mineral resources uneconomic and result in reduced reported mineralization or adversely affect the commercial viability determinations reached by us. Material changes in estimates of mineralization, grades, stripping ratios, recovery rates or of our ability to extract such mineralization may affect the economic viability of projects and the value of our Livengood Gold Project. The estimated resources described in our reports should not be interpreted as assurances of mine life or of the profitability of future operations. Estimated mineral resources and mineral reserves may have to be re-estimated based on changes in applicable commodity prices, further exploration or development activity or actual production experience. This could materially and adversely affect estimates of the volume or grade of mineralization, estimated recovery rates or other important factors that influence mineral resource or mineral reserve estimates. Market price fluctuations for gold, silver or base metals, increased production costs or reduced recovery rates or other factors may render any particular reserves uneconomical or unprofitable to develop at a particular site or sites. A reduction in estimated reserves could require material write downs in investment in the affected mining property and increased amortization, reclamation and closure charges. **Mineral resources are not mineral reserves and there is no assurance that any mineral resources will ultimately be reclassified as proven or probable reserves. Mineral resources which are not mineral reserves do not have demonstrated economic viability.**

***There are differences in U.S. and Canadian practices for reporting reserves and resources.***

Our reserve and resource estimates are not directly comparable to those made in filings subject to SEC reporting and disclosure requirements, as we report reserves and resources in accordance with Canadian practices. These practices are different from the practices used to report reserve and resource estimates in reports and other materials filed with the SEC. It is Canadian practice to report measured, indicated and inferred mineral resources (and in certain circumstances, deposits that are not measured, indicated or inferred mineral resources but that are targeted for further exploration), which are generally not permitted in disclosure filed with the SEC by U.S. issuers. In the United States and in Canada, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. U.S. investors are cautioned not to assume that all or any part of measured, indicated or inferred mineral resources will ever be converted into reserves.

Further, “inferred mineral resources” have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Disclosure of “contained ounces” is permitted disclosure under Canadian regulations; however, the SEC only permits issuers to report “resources” as in place, tonnage and grade without reference to unit measures.

Accordingly, information concerning descriptions of mineralization, reserves and resources contained in our reports may not be comparable to information made public by U.S. companies subject to the reporting and disclosure requirements of the SEC.

***Increased costs could affect our ability to bring our projects into production and, once in production, our financial condition and ability to be profitable.***

Management anticipates that costs at the Livengood Gold Project will frequently be subject to variation from one year to the next due to a number of factors, such as changing ore grade, metallurgy and revisions to mine plans, if any, in response to the physical shape and location of the ore body. In addition, costs are affected by the price of commodities such as fuel, rubber and electricity. Such commodities are at times subject to volatile price movements, including increases that could make production less profitable or not profitable at all. A material increase in costs could also impact our ability to maintain operations and have a significant effect on the Company’s profitability.

***The volatility of the price of gold could adversely affect our future operations and, if warranted, our ability to develop our properties.***

Even if commercial quantities of mineral deposits are discovered by the Company, there is no guarantee that a profitable market will exist for the sale of the metals produced, if any. The Company’s long-term viability and profitability, the value of the Company’s properties, the market price of its common shares and the Company’s ability to raise funding to conduct continued exploration and development, if warranted, depend, in large part, upon the market price of gold. The decision to put a mine into production and to commit the funds necessary for that purpose must be made long before the first revenue from production would be received. A decrease in the price of gold may prevent the Company’s property from being economically mined or result in the write-off of assets whose value is impaired as a result of lower gold prices.

The price of gold has experienced significant movement over short periods of time, and is affected by numerous factors beyond the control of the Company, including economic and political conditions, expectations of inflation, currency exchange fluctuations, interest rates, global or regional demand, sale or purchase of gold by various central banks and financial institutions, speculative activities and increased production due to improved mining and production methods. The volatility of mineral prices represents a substantial risk which no amount of planning or technical expertise can fully eliminate. There can be no assurance that the price of gold will be such that any such deposits can be mined at a profit. The volatility in gold prices is illustrated by the following table, which presents the high, low and average fixed price in U.S. dollars for an ounce of gold, based on the London Bullion Market Association P.M. fix, over the past five years:

|  | High | Low | Average |
| --- | ---: | ---: | ---: |
| 2012 | $1,792 | $1,540 | $1,669 |
| 2013 | $1,694 | $1,192 | $1,410 |
| 2014 | $1,385 | $1,142 | $1,266 |
| 2015 | $1,296 | $1,049 | $1,159 |
| 2016 | $1,366 | $1,077 | $1,250 |
| January 1, 2017 to March 13, 2017 | $1,257 | $1,151 | $1,214 |

### Our results of operations could be affected by currency fluctuations.

The Livengood Gold Project is located in the United States, with most costs associated with the Project paid in U.S. dollars, and the Company maintains its accounts in Canadian and U.S. dollars, making it subject to foreign currency fluctuations. There can be significant swings in the exchange rate between the U.S. and Canadian dollar. There are no plans at this time to hedge against any exchange rate fluctuations in currencies. Adverse foreign currency fluctuations may cause losses and materially affect the Company’s financial position and results.

***Resource exploration, development and production involve a high degree of risk and we do not maintain insurance with respect to certain of these risks, which exposes us to significant risk of loss.***

Resource exploration, development and production involve a high degree of risk. Our operations are, and any future development or mining operations we may conduct will be, subject to all of the operating hazards and risks normally incident to exploring for and development of mineral properties, such as, but not limited to:

- economically insufficient mineralized material;
- fluctuation in exploration, development and production costs;
- labor disputes;
- unanticipated variations in grade and other geologic problems;
- water conditions;
- difficult surface or underground conditions;
- mechanical and equipment failure;
- failure of pit walls or dams;
- environmental hazards;
- industrial accidents;
- metallurgical and other processing problems;
- unusual or unexpected rock formations;
- personal injury, cave-ins, landslides, flooding, fire, explosions, and rock-bursts;
- metal losses;
- power outages;
- periodic interruptions due to inclement or hazardous weather conditions; and
- decrease in the value of mineralized material due to lower gold prices.

These risks could result in damage to, or destruction of, mineral properties, facilities or other property, personal injury, environmental damage, delays in operations, increased cost of operations, monetary losses and possible legal liability. Although the Company maintains or can be expected to maintain insurance within ranges of coverage consistent with industry practice, no assurance can be given that the Company will be able to obtain insurance to cover all of these risks at economically feasible premiums or at all. The Company may elect not to insure where premium costs are disproportionate to the Company’s perception of the relevant risks. The payment of such insurance premiums and of such liabilities would reduce the funds available for exploration and production activities, if warranted. Should events such as these that are not covered by insurance arise, they could reduce or eliminate our assets and shareholder equity as well as result in increased costs and a decline in the value of our assets or common shares.

***We may not be able to obtain all required permits and licenses to place any of our properties into production.***

The current and future operations of the Company require licenses and permits from various governmental authorities. There can be no assurance that the Company will be able to obtain all necessary licenses and permits that may be required to carry out exploration, development and mining operations at its projects, on reasonable terms or at all. Costs related to applying for and obtaining permits and licenses may be prohibitive and could delay our planned exploration and development activities. Failure to comply with permitting requirements may result in enforcement actions, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Delays in obtaining, or a failure to obtain, any such licenses and permits, or a failure to comply with the terms of any such licenses and permits that the Company does obtain, could delay or prevent production of the Livengood Gold Project and have a material adverse effect on the Company.

***Title to the Livengood Gold Project may be subject to defects in title or other claims, which could affect our property rights and claims.***

There are risks that title to the Livengood Gold Project may be challenged or impugned. The Livengood Gold Project is located in the State of Alaska and may be subject to prior unrecorded agreements or transfers or native land claims, and title may be affected by undetected defects. There may be valid challenges to the title of the Livengood Gold Project which, if successful, could impair development or operations. This is particularly the case in respect of those portions of our properties in which we hold our interest solely through a lease with the claim holders, as such interest is substantially based on contract and has been subject to a number of assignments (as opposed to a direct interest in the property).

Some of the mining claims at the Livengood Gold Project are U.S. federal or Alaska state “unpatented” mining claims. There is a risk that a portion of such unpatented mining claims could be determined to be invalid, in which case the Company could lose the right to mine any minerals contained within those mining claims. Unpatented mining claims are created and maintained in accordance with the applicable U.S. federal and Alaska state mining laws. Unpatented mining claims are unique property interests and are generally considered to be subject to greater title risk than other real property interests due to the validity of unpatented mining claims often being uncertain. This uncertainty arises, in part, out of the complex federal and state laws and regulations under the provisions of the U.S. *General Mining Law of 1872* (the “Mining Law”). Unpatented mining claims are always subject to possible challenges of third parties or validity contests by the United States federal government or the Alaska state government, as applicable. The validity of an unpatented mining claim, in terms of both its location and its maintenance, is dependent on strict compliance with a complex body of federal and state statutory and decisional law. Title to the unpatented mining claims may also be affected by undetected defects such as unregistered agreements or transfers and there are few public records that definitively determine the issues of validity and ownership of unpatented mining claims. The Company has not obtained full title opinions for the majority of its mineral properties. Not all the mineral properties in which the Company has an interest have been surveyed, and their actual extent and location may be in doubt. Should the federal government impose a royalty or additional tax burdens on the properties that lie within public lands, the resulting mining operations could be seriously impacted, depending upon the type and amount of the burden.

The leases and agreements pursuant to which the Company has interests, or the right to acquire interests, in a significant portion of the Livengood Gold Project provide that the Company must make a series of cash payments over certain time periods or expend certain minimum amounts on the exploration of the properties. Failure by the Company to make such payments or make such expenditures in a timely fashion may result in the Company losing its interest in such properties. There can be no assurance that the Company will have, or be able to obtain, the necessary financial resources to be able to maintain all of its property agreements in good standing, or to be able to comply with all of its obligations thereunder, which could result in the Company forfeiting its interest in one or more of its mineral properties.

***The Company may not have and may not be able to obtain surface or access rights to all or a portion of the Livengood Gold Project.***

Although the Company acquires the rights to some or all of the minerals in the ground subject to the mineral tenures that it acquires, or has a right to acquire, in most cases it does not thereby acquire any rights to, or ownership of, the surface to the areas covered by its mineral tenures. In such cases, applicable mining laws usually provide for rights of access to the surface for the purpose of carrying on mining activities, however, the enforcement of such rights through the courts can be costly and time consuming. It is necessary to negotiate surface access or to purchase the surface rights if long-term access is required. There can be no guarantee that, despite having the right at law to access the surface and carry on mining activities, the Company will be able to negotiate satisfactory agreements with any such existing landowners/occupiers for such access or purchase such surface rights, and therefore it may be unable to carry out planned exploration or mining activities. In addition, in circumstances where such access is denied, or no agreement can be reached, the Company may need to rely on the assistance of local officials or the courts in such jurisdiction the outcomes of which cannot be predicted with any certainty. The inability of the Company to secure surface access or purchase required surface rights could materially and adversely affect the timing, cost or overall ability of the Company to develop any mineral deposits it may locate.

### Our properties and operations may be subject to litigation or other claims.

From time to time our properties or operations may be subject to disputes which may result in litigation or other legal claims. We may be required to assert or defend against these claims which will divert resources and management time from operations. The costs of these claims or adverse filings may have a material effect on our business and results of operations.

***We are subject to significant governmental regulations which affect our operations and costs of conducting our business.***

Any exploration activities carried on by the Company are, and any future development or mining operations we may conduct will be, subject to extensive laws and regulations governing various matters, including:

- mineral concession acquisition, exploration, development, mining and production;
- management of natural resources;
- exports, price controls, taxes and fees;
- labor standards on occupational health and safety, including mine safety;
- post-closure reclamation;
- environmental standards, waste disposal, toxic substances, explosives, land use and environmental protection; and
- dealings with indigenous peoples and historic and cultural preservation.

Companies engaged in exploration activities often experience increased costs and delays in production and other schedules as a result of the need to comply with applicable laws, regulations and permits. Failure to comply with applicable laws, regulations and permits may result in civil or criminal fines or penalties, enforcement actions thereunder, including the forfeiture of claims, orders issued by regulatory or judicial authorities requiring operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or costly remedial actions, any of which could result in the Company incurring significant expenditures. The Company may also be required to compensate third parties suffering loss or damage as a result of our mineral exploration activities and may have civil or criminal fines or penalties imposed for violations of such laws, regulations and permits.

It is also possible that future laws and regulations could cause additional expense, capital expenditures, restrictions on or suspension of the Company’s operations and delays in the exploration and development of the Company’s properties.

***Legislation has been proposed that would significantly affect the mining industry and our business.***

In recent years, members of the United States Congress have repeatedly introduced bills which would supplant or alter the provisions of the Mining Law. If adopted, such legislation, among other things, could eliminate or greatly limit the right to a mineral patent, impose federal royalties on mineral production from unpatented mining claims located on United States federal lands (which includes certain of the mining claims at the Livengood Gold Project), result in the denial of permits to mine after the expenditure of significant funds for exploration and development, reduce estimates of mineral reserves and reduce the amount of future exploration and development activity on U.S. federal lands, all of which could have a material and adverse effect on the Company’s ability to operate and its cash flow, results of operations and financial condition.

***Our activities are subject to environmental laws and regulations that may increase our costs of doing business and restrict our operations.***

The activities of the Company are subject to environmental regulations in the jurisdictions in which we operate. Environmental legislation generally provides for restrictions and prohibitions on spills, releases or emissions into the air, discharges into water, management of waste, management of hazardous substances, protection of natural resources, antiquities and endangered species and reclamation of lands disturbed by mining operations. Certain types of operations require the submission and approval of environmental impact assessments. Environmental legislation is evolving in a manner involving stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees. Compliance with environmental laws and regulations and future changes in these laws and regulations may require significant capital outlays, cause material changes or delays in our current and planned operations and future activities and reduce the profitability of operations. It is possible that future changes in these laws or regulations could have a significant adverse impact on the Livengood Gold Project or some portion of our business, causing us to re-evaluate those activities at that time.

Examples of current U.S. federal laws which may affect our current operations and may impact future business and operations include, but are not limited to, the following:

The Comprehensive Environmental, Response, Compensation, and Liability Act (“CERCLA”), and comparable state statutes, impose strict, joint and several liability on current and former owners and operators of sites and on persons who disposed of or arranged for the disposal of hazardous substances found at such sites. It is not uncommon for the government to file claims requiring cleanup actions, demands for reimbursement for government-incurred cleanup costs, or natural resource damages, or for neighboring landowners and other third parties to file claims for personal injury and property damage allegedly caused by hazardous substances released into the environment. The Federal Resource Conservation and Recovery Act (“RCRA”), and comparable state statutes, govern the disposal of solid waste and hazardous waste and authorize the imposition of substantial fines and penalties for noncompliance, as well as requirements for corrective actions. CERCLA, RCRA and comparable state statutes can impose liability for clean-up of sites and disposal of substances found on exploration, mining and processing sites long after activities on such sites have been completed.

The Clean Air Act (“CAA”) restricts the emission of air pollutants from many sources, including mining and processing activities. Our mining operations may produce air emissions, including fugitive dust and other air pollutants from stationary equipment, storage facilities and the use of mobile sources such as trucks and heavy construction equipment, which are subject to review, monitoring or control requirements under the CAA and state air quality laws. New facilities may be required to obtain permits before work can begin, and existing facilities may be required to incur capital costs in order to remain in compliance. In addition, permitting rules may impose limitations on our production levels or result in additional capital expenditures in order to comply with the regulations.

The National Environmental Policy Act (“NEPA”) requires federal agencies to integrate environmental considerations into their decision-making processes by evaluating the environmental impacts of their proposed actions, including issuance of permits to mining facilities, and assessing alternatives to those actions. If a proposed action could significantly affect the environment, the agency must prepare a detailed statement known as an Environmental Impact Statement (“EIS”). The U.S. Environmental Protection Agency (“EPA”), other federal agencies, and any interested third parties will review and comment on the scoping of the EIS and the adequacy of and findings set forth in the draft and final EIS. We are required to undertake the NEPA process for the Livengood Gold Project permitting. The NEPA process can cause delays in issuance of required permits or result in changes to a project to mitigate its potential environmental impacts, which can in turn impact the economic feasibility of a proposed project or the ability to construct or operate the Livengood Gold Project or other properties and may make them entirely uneconomic.

The Clean Water Act (“CWA”), and comparable state statutes, impose restrictions and controls on the discharge of pollutants into waters of the United States. The discharge of pollutants into regulated waters is prohibited, except in accordance with the terms of a permit issued by the EPA or an analogous state agency. The CWA regulates storm water mining facilities and requires a storm water discharge permit for certain activities. Such a permit requires the regulated facility to monitor and sample storm water run-off from its operations. The CWA and regulations implemented thereunder also prohibit discharges of dredged and fill material in wetlands and other waters of the United States unless authorized by an appropriately issued permit. The CWA and comparable state statutes provide for civil, criminal and administrative penalties for unauthorized discharges of pollutants and impose liability on parties responsible for those discharges for the costs of cleaning up any environmental damage caused by the release and for natural resource damages resulting from the release.

The Safe Drinking Water Act (“SDWA”) and the Underground Injection Control (“UIC”) program promulgated thereunder, regulate the drilling and operation of subsurface injection wells. The EPA directly administers the UIC program in some states and in others the responsibility for the program has been delegated to the state. The program requires that a permit be obtained before drilling a disposal or injection well. Violation of these regulations or contamination of groundwater by mining related activities may result in fines, penalties, and remediation costs, among other sanctions and liabilities under the SDWA and state laws. In addition, third party claims may be filed by landowners and other parties claiming damages for alternative water supplies, property damages, and bodily injury.

***Regulations and pending legislation governing issues involving climate change could result in increased operating costs, which could have a material adverse effect on our business.***

A number of governments or governmental bodies have introduced or are contemplating regulatory changes in response to various climate change interest groups and the potential impact of climate change. Legislation and increased regulation regarding climate change could impose significant costs on us, our future partners and our suppliers, including costs related to increased energy requirements, capital equipment, environmental monitoring and reporting and other costs to comply with such regulations. Any adopted future climate change regulations could also negatively impact our ability to compete with companies situated in areas not subject to such limitations. Given the emotion, political significance and uncertainty around the impact of climate change and how it should be dealt with, we cannot predict how legislation and regulation will affect our financial condition, operating performance and ability to compete. Furthermore, even without such regulation, increased awareness and any adverse publicity in the global marketplace about potential impacts on climate change by us or other companies in our industry could harm our reputation. The potential physical impacts of climate change on our operations are highly uncertain and would be particular to the geographic circumstances in areas in which we operate. These may include changes in rainfall and storm patterns and intensities, water shortages, changing sea levels and changing temperatures. These impacts may adversely impact the cost, production and financial performance of our operations.

***Land reclamation requirements for our properties may be burdensome and expensive in the future.***

Land reclamation requirements are generally imposed on mineral exploration companies (as well as companies with mining operations) in order to minimize long term effects of land disturbance. Reclamation may include requirements to:

- control dispersion of potentially deleterious effluents;
- treat ground and surface water to drinking water standards; and
- reasonably re-establish pre-disturbance land forms and vegetation.

In order to carry out reclamation obligations imposed on us in connection with the potential development activities at the Livengood Gold Project, we must allocate financial resources that might otherwise be spent on further exploration and development programs. We plan to set up a provision for reclamation obligations on the Livengood Gold Project, as appropriate, but this provision may not be adequate. If we are required to carry out unanticipated reclamation work, our financial position could be adversely affected.

***The mining industry is intensely competitive, and we have limited financial and personnel resources with which to compete.***

The Company’s business of the acquisition, exploration and development, if warranted, of mineral properties is intensely competitive. The Company may be at a competitive disadvantage in acquiring additional mining properties because it must compete with other individuals and companies, many of which may have greater financial resources, operational experience and technical capabilities than the Company. The Company may also encounter increasing competition from other mining companies in efforts to hire experienced mining professionals. Increased competition could adversely affect the Company’s ability to attract necessary capital funding, acquire suitable producing properties or prospects for mineral exploration in the future, or attract or retain key personnel or outside technical resources.

***A shortage of equipment and supplies could adversely affect our ability to operate our business.***

We are dependent on various supplies and equipment to carry out our exploration and, if warranted, development and mining operations. The shortage of such supplies, equipment and parts could have a material adverse effect on our ability to carry out our operations and therefore limit or increase the cost of production.

***We are dependent on key personnel and the absence of any of these individuals could adversely affect our business. We may experience difficulty attracting and retaining qualified personnel.***

Our success is largely dependent on the performance and abilities of our directors, officers, employees and management and on our ability to attract and retain additional key personnel in exploration, mine development, sales, marketing, technical support and finance. In addition, the Company has relied and may continue to rely upon consultants and others for operating expertise. There is no assurance that we will be able to maintain the services of our directors, officers, employees or other qualified personnel required to operate our business. The loss of the services of these persons could have a material adverse effect on our business and prospects. Recruiting and retaining qualified personnel is critical to our success and there can be no assurance we will be able to recruit and retain such personnel. The number of persons skilled in the acquisition, exploration and development of mineral properties is limited and competition for such persons is intense. If we are not successful in attracting and retaining qualified personnel, our ability to develop our properties could be affected, which could have a material adverse effect on our business, results of operations, cash flows and financial condition. We do not maintain “key man” life insurance policies on any of our officers or employees.

***Canadian investors may not be able to enforce their civil liabilities against us.***

It may be difficult for Canadian investors to bring and enforce suits against us. As substantially all of the assets of the Company and its subsidiaries are located outside of Canada, and certain of the directors and officers of the Company are resident outside of Canada, it may be difficult or impossible for Canadian investors to enforce judgments granted by a court in Canada against the assets of the Company or the directors and officers of the Company residing outside of Canada. A shareholder should not assume that the courts of the United States (i) would enforce judgments of Canadian courts obtained in actions against us or such persons predicated upon the civil liability provisions of the Canadian securities laws or other laws of Canada, or (ii) would enforce, in original actions, liabilities against us or such persons predicated upon Canadian securities laws or other laws of Canada.

### Risks Related to Our Common Shares

***Our share price may be volatile and as a result you could lose all or part of your investment.***

In recent years, the securities markets in the United States and Canada have experienced a high level of price and volume volatility, and the market price of securities of many companies, particularly those considered exploration or development stage companies, have experienced wide fluctuations in price which have not necessarily been related to the operating performance, underlying asset values or prospects of such companies. It may be anticipated that any quoted market for our common shares will be subject to market trends and conditions generally, notwithstanding any potential success we have in creating revenues, cash flows or earnings. The price of our common shares has been subject to price and volume volatility in the past. In 2016, the price of our common shares on the Toronto Stock Exchange ranged from a low of C$0.27 to a high of C$1.76, and on the NYSE MKT ranged from a low of $0.19 to a high of $1.35. From January 1, 2017 to March 13, 2017, the price of our common shares on the TSX ranged from a low of C$0.63 to a high of $0.98, and on the NYSE MKT ranged from a low of $0.49 to a high of $0.74. There can be no assurance that significant fluctuations in the trading price of the Company’s common shares will not continue to occur, or that such fluctuations will not materially adversely impact the Company’s ability to raise equity funding without significant dilution to its existing shareholders, or at all. As a result, our shareholders may be unable to resell their shares at a desired price.

***The Toronto Stock Exchange has commenced a delisting review of the Company’s common shares.***

In connection with the non-brokered private placement (“Placement”) completed by the Company in December 2016, the Company would, under the rules of the Toronto Stock Exchange (“TSX”), normally have been required to obtain shareholder approval to the Placement as the aggregate number of common shares issued pursuant to the Placement exceeded 25% of the then issued and outstanding common shares of the Company, the number of common shares issued to insiders pursuant to the Placement exceeded 10% of the then issued and outstanding common shares of the Company and the Placement materially affected control of the Company. However, the Company applied to the TSX for a “financial hardship” exemption from the requirement to obtain shareholder approval for the Placement, which exemption was granted by the TSX.

However, as a consequence of the Company relying upon the financial hardship exemption, the TSX has commenced a remedial de-listing review, which is normal practice when a listed issuer seeks to rely on this exemption. This review is ongoing but is likely to be completed before the end of April, 2017. Although the Company believes that it will be determined to be in compliance with all of the TSX listing requirements, no assurance can be provided as to the outcome of such review and, therefore, the Company’s continued qualification for listing on the TSX. If the Company is not qualified for listing on the TSX, the Company’s common shares will be delisted and no longer trade on the TSX.

***Future sales of our securities in the public or private markets will dilute our current shareholders and could adversely affect the trading price of our common shares and our ability to continue to raise funds in new stock offerings.***

It is likely that the Company will sell common shares or securities exercisable or convertible into common shares in the future. The Company may issue securities on less than favorable terms to raise sufficient capital to fund its business plan. Any transaction involving the issuance of equity securities or securities convertible into common shares would result in dilution, possibly substantial, to present and prospective holders of common shares, could adversely affect the trading prices of our common shares, and could impair our ability to raise capital through future offerings of securities.

***We have never paid dividends on our common shares.***

We have not paid dividends on our common shares to date, and we may not be in a position to pay dividends for the foreseeable future. Our ability to pay dividends will depend on our ability to successfully develop the Livengood Gold Project and generate earnings from operations. Further, our initial earnings, if any, will likely be retained to finance our operations. Any future dividends will depend upon our earnings, our then-existing financial requirements and other factors, and will be at the discretion of the Board.

***Our business is subject to evolving corporate governance and public disclosure regulations that have increased both our compliance costs and the risk of noncompliance, which could have an adverse effect on our stock price.***

We are subject to changing rules and regulations promulgated by a number of governmental and self-regulated organizations, including the British Columbia Securities Commission, the SEC, the TSX, the NYSE MKT, and the Financial Accounting Standards Board. These rules and regulations continue to evolve in scope and complexity and many new requirements have been created in response to laws enacted by the United States Congress, making compliance more difficult and uncertain. For example, on July 21, 2010, the United States Congress passed the Dodd-Frank Wall Street Reform and Consumer Protection Act (the “Dodd-Frank Act”) with increased disclosure obligations for public companies and mining companies in the United States. Our efforts to comply with the Dodd-Frank Act and other new regulations have resulted in, and are likely to continue to result in, increased general and administrative expenses and a diversion of management time and attention from operating activities to compliance activities.

***We likely constituted a passive foreign investment company (“PFIC”) during the fiscal year ended December 31, 2016, which may result in adverse U.S. federal income tax consequences to U.S. holders.***

We believe that we were a PFIC for U.S. federal income tax purposes during the fiscal year ended December 31, 2016, and we expect that we will be a PFIC in the current year and that we may continue to be classified as a PFIC in future years. The determination of whether or not the Company is a PFIC is a factual determination dependent on a number of factors and cannot be made until the close of the applicable tax year and accordingly no assurances can be given regarding the Company’s PFIC status for the current year or any future year. If ITH is a PFIC at any time during a U.S. holder’s holding period, then certain potentially adverse tax consequences could apply to such U.S. holder’s acquisition, ownership, and disposition of common shares. For more information, please see the discussion in “Certain U.S. Federal Income Tax Considerations for U.S. Holders” below.

## Properties

As filed, 37,114 characters.

#### LIVENGOOD GOLD PROJECT, Alaska

The Company currently holds, or has rights to acquire, ownership or leasehold interests in a group of adjacent mineral properties in Alaska which are collectively referred to as the “Livengood Gold Project.” The Livengood Gold Project is located approximately 113 km (70 miles) by road northwest of Fairbanks, Alaska and approximately 65 km (40 miles) north of the boundary of the Fairbanks North Star Borough as shown in Figure 1 below. The project lies within the Tolovana Mining District in the northern part of the Tintina Gold Belt. The Company’s primary focus is to continue to advance the Livengood Gold Project with the objective of assessing its viability for commercial gold mining.

The Company is in the process of optimizing the Livengood Gold Project and does not mine, produce or sell any mineral products at this time. The Company controls 100% of the Livengood Gold Project, which has a current (as at August 26, 2016) mineral resource of 497 million measured tonnes at an average grade of 0.68 g/tonne (10.84 million ounces), 28 million indicated tonnes at an average grade of 0.69 g/tonne (0.62 million ounces) and 53 million inferred tonnes at an average grade of 0.66 g/tonne (1.1 million ounces). In 2016 the Company issued the results of a pre-feasibility study that was summarized in the October 2016 Study which converted a portion of the mineral resources at the Project into proven reserves of 378 million tonnes at an average grade of 0.71 g/tonne (8.62 million ounces) and probable reserves of 14 million tonnes at an average grade of 0.72 g/tonne (353,000 ounces) based on a gold price of $1,250 per ounce. All work presently planned by the Company is directed at maintaining necessary environmental baseline activities at the Livengood Gold Project and focusing efforts on Project optimization opportunities, including those identified in the October 2016 Study.

The Company relies upon consultants and contractors to carry on many of its activities and, in particular, to carry out drilling programs at the Livengood Gold Project and in connection with metallurgical test work, engineering and the preparation of technical reports on the Project. However, as ITH expands its activities, it may choose to hire additional employees rather than relying on consultants.

### Figure 1: Location of the Livengood Gold Project

### Accessibility, Climate, Local Resources, Infrastructure and Physiography

The Livengood Gold Project is located approximately 113 km (70 miles) by road northwest of Fairbanks, Alaska in the Tolovana Mining District within the Tintina Gold Belt. The Project area is centered on Money Knob, a local topographic high point. This feature and the adjoining ridgelines are the probable lode gold source for the Livengood placer deposits which lie in the adjacent valleys which have been actively mined since 1914 and have produced more than 500,000 ounces of gold.

The Livengood Gold Project straddles and is accessed via the Elliot Highway, a paved, all weather road linking the north slope oil fields at Prudhoe Bay to central and southern Alaska through Fairbanks. At present there are no full time residents in the former mining town of Livengood. A number of unpaved roads have been developed in the area providing excellent access. A 427m (1400-foot) runway is located 6 km (3.7 miles) to the southwest near the former Alyeska Pipeline Company Livengood Camp and is suitable for light aircraft. The Livengood Gold Project is also adjacent to the Alyeska Pipeline corridor, which transports crude oil from Prudhoe Bay south. This corridor contains a fiber optic communications cable utilized at the Livengood Gold Project.

Topography at the site is eroded hills and valleys with a general elevation difference of 200m (656 feet). The valleys generally contain active streams draining into the Tolovana River system to the west.

The site is approximately 65 km (40 miles) south of the Arctic Circle, and has a subarctic climate with long, cold winters and short, warm summers. Annual precipitation is approximately 40 cm (16 inches). Average low temperatures in winter are -21° to -28° Celsius (-6° to -18° Fahrenheit), with records reaching as low as -55° Celsius (-67° Fahrenheit). Exploration work on the Livengood Gold Project can be limited due to excessive snow cover and cold temperatures. In general, surface sampling work is limited to May through September and surface drilling from March through November. Road-accessible wetland areas may only be explored while frozen in the winter. Work to date on the site has been limited to exploration and geotechnical drilling and environmental baseline activities. The Company does not have any plant or equipment at the site, relying on contractors to perform the work.

The nearest community to Livengood Gold Project is the village of Minto, a town with a population of approximately 258 located approximately 65 km (40 miles) southwest by road. The Fairbanks metropolitan area has a population of approximately 100,000 people, and comprises the regional center with hospitals, government offices, businesses and the University of Alaska, Fairbanks. The city is linked to southern Alaska along a north-south transportation and utility corridor that includes two paved highways, a railroad to tide water, an interlinked electrical grid, and communications infrastructure. Fairbanks has an international airport serviced daily by up to three major airlines.

In preliminary, nonbinding discussions, the local utility in Fairbanks (Golden Valley Electrical Association) has indicated that 80-100 Megawatts of power could be available to the Livengood Gold Project. Livengood would be connected to the local grid by building a 82 km (50 miles) 230-kVA line along the pipeline corridor. Environmental baseline studies required for the electrical line construction started in 2011.

The October 2016 Study developed site layout plans for the infrastructure required at the Livengood Gold Project. This included evaluating mine shops; process, water and tailing management facilities; power; access roads; administration offices; and camp facilities.

### Livengood Gold Project Lands

The Livengood Gold Project covers approximately 19,546 hectares (48,300 acres), all of which is controlled by the Company through TH Alaska. The Livengood Gold Project is comprised of multiple land parcels: 100% owned patented mining claims, 100% owned State of Alaska mining claims, 100% owned federal unpatented placer claims; land leased from the Alaska Mental Health Trust (“AMHT”); land leased from holders of state and federal patented and unpatented mining and placer claims, and undivided interests in patented mining claims. The property and claims controlled through ownership, leases or agreements are summarized below.

### 100% owned patented mining claims

- U.S. Mineral Survey 2447, located on lower Livengood Creek, subject to the December 2011 land purchase agreement described below and further subject to an agreement to allow Larry Nelson, as agent for Nelson Mining Company, to operate a placer mine on MS 2447 through May 11, 2018.
- U.S. Mineral Survey 1956, located on lower Gertrude Creek, subject to a reserved royalty of 5% of gross value held by Key Trust Company on behalf of the Luther Hess Trust, and further subject to an agreement to allow Samuel Eaves and Patricia Eaves to operate a placer mine on MS 1956 through June 1, 2017.
- With respect to portions of U.S. Mineral Survey 1626, located on lower Amy Creek:

100% of No. 2 Above Discovery Any Creek,

100% of No. 3 Above Discovery Amy Creek, and

100% of Up Grade Association Bench

### 100% owned State of Alaska mining claims

- 169 state claims acquired by purchase.
- 153 state claims acquired by location.

### 100% owned federal unpatented placer claims

- 29 federal unpatented placer claims, subject to the December 2011 land purchase agreement described below.

**100% owned Livengood Placers, Inc.,** a private Nevada corporation that is 100% owned by TH Alaska. Livengood Placers, Inc. is the record owner of the following:

- 29 patented claims, subject to the December 2011 land purchase agreement described below.
- 108 federal unpatented placer claims, subject to the December 2011 land purchase agreement described below.
- 24 State of Alaska mining claims, subject to the December 2011 land purchase agreement described below.

### Leased property

- Alaska Mental Health Trust Lease. A lease of the AMHT mineral rights having a term commencing July l, 2004 and extending 19 years until June 30, 2023, subject to further extensions beyond June 30, 2023 by either commercial production or payment of an advance minimum royalty equal to 125% of the amount paid in year 19 and diligent pursuit of development. The lease requires minimum work expenditures and advance minimum royalties which escalate annually with inflation. A net smelter return (“NSR”) production royalty of between 2.5% and 5.0% (depending upon the price of gold) is payable to the lessor with respect to the lands subject to this lease. In addition, an NSR production royalty of l% is payable to the lessor with respect to the unpatented federal mining claims subject to the lease described in the Hudson/Geraghty Lease below and an NSR production royalty of between 0.5% and 1.0% (depending upon the price of gold) is payable to the lessor with respect to the lands acquired by the Company as a result of the purchase of Livengood Placers, Inc. in December 2011. As of December 31, 2016, there were 9,970 acres included in the AMHT lease.
- Hudson/Geraghty Lease. A lease of 20 federal unpatented lode mining claims having an initial term of ten years commencing on April 21, 2003 and continuing for so long thereafter as advance minimum royalties are paid and mining related activities, including exploration, continue on the property or on adjacent properties controlled by the Company. The lease requires an advance minimum royalty of $50,000 on or before each anniversary date (all of which minimum royalties are recoverable from production royalties). An NSR production royalty of between 2% and 3% (depending on the price of gold) is payable to the lessors. The Company may purchase 1% of the royalty for $1,000,000.
- Griffin Lease. A lease of three patented lode claims having an initial term of ten years commencing January 18, 2007, and continuing for so long thereafter as advance minimum royalties are paid. The lease requires an advance minimum royalty of $20,000 on or before each anniversary date through January 18, 2017 and $25,000 on or before each subsequent anniversary (all of which minimum royalties are recoverable from production royalties). An NSR production royalty of 3% is payable to the lessors. The Company may purchase all interests of the lessors in the leased property (including the production royalty) for $1,000,000 (less all minimum and production royalties paid to the date of purchase), of which $500,000 is payable in cash over four years following the closing of the purchase and the balance of $500,000 is payable by way of the 3% NSR production royalty.
- Tucker Lease. A lease of two unpatented federal lode mining claims and four federal unpatented placer claims having an initial term of ten years commencing on March 28, 2007, and continuing for so long thereafter as advance minimum royalties are paid and mining related activities, including exploration, continue on the property or on adjacent properties controlled by the Company. The lease requires an advance minimum royalty of $15,000 on or before each anniversary date (all of which minimum royalties are recoverable from production royalties). The Company is required to pay the lessor the sum of $250,000 upon making a positive production decision, payable $125,000 within 120 days of the decision and $125,000 within a year of the decision (all of which are recoverable from production royalties). An NSR production royalty of 2% is payable to the lessor. The Company may purchase all of the interest of the lessor in the leased property (including the production royalty) for $1,000,000.

### Patented claims (undivided interests less than 100%)

- An undivided 5/6th interest in that certain patented placer mining claim known as the “Kinney Bench” claim, included within U.S. Mineral Survey No. 1626 on lower Amy Creek.
- An undivided 5/9th interest in that certain patented placer mining claim known as the “Union Bench Association” claim, included within U.S. Mineral Survey No. 1626 on lower Amy Creek.
- An undivided 1/6th interest in that certain patented placer mining claim known as the “Bessie Bench” claim, included within U.S. Mineral Survey No. 1626 on lower Amy Creek.
- An undivided 1/3rd interest in those certain patented placer mining claims known as the “War Association” claim; the “Mutual Association” claim; and the “O.K. Fraction” claim, all included within U.S. Mineral Survey No. 2033 on lower Amy Creek.

On State of Alaska lands, the state holds both the surface and the subsurface rights. State of Alaska 40-acre mining claims require an annual rental payment of $35/claim to be paid to the state (by November 30th of each year), for the first five years, $70 per year for the second five years, and $170 per year thereafter. These rental rates are multiplied by 4 for each 160 acre claim. As a consequence of the annual rentals due, all Alaska State Mining Claims have an expiry date of November 30th each year. In addition, there is a minimum annual work expenditure requirement of $100 per 40-acre claim (due on or before noon on September 1 in each year) or cash-in-lieu thereof, and an affidavit evidencing that such work has been performed is required to be filed on or before November 30th in each year. Excess work can be carried forward for up to four years. If the rental is paid and the work requirements are met, the claims can be held indefinitely. The work completed by the Company during the 2016 field season was filed as assessment work, and the value of that work is sufficient to meet the assessment work requirements through September 1, 2020 on all State of Alaska mining claims.

Holders of State of Alaska mining claims are also required to pay a production royalty on all revenue received from minerals produced on state land during each calendar year. The production royalty rate is 3% of net income.

Holders of federal unpatented mining claims are required to pay an annual rental of $140 per 20 acres.

All of the foregoing agreements are in good standing and are transferable. The Company has taken reasonable steps to verify title to mineral properties in which it has an interest. Except for the patented claims, none of the properties have been surveyed.

Holders of Federal and Alaska State unpatented mining claims have the right to use the land or water included within mining claims only when necessary for mineral prospecting, development, extraction, or basic processing, or for storage of mining equipment. However, the exercise of such rights is subject to the appropriate permits being obtained.

### December 2011 Land Purchase Agreement

In December 2011, the Company completed a transaction to acquire certain mining claims and related rights in the vicinity of the Livengood Gold Project. This acquisition included both mining claims and all of the shares of Livengood Placers, Inc. These assets were purchased on December 13, 2011 for aggregate consideration of $36,600,000 allocated between cash consideration of $13,500,000 and a derivative liability of $23,100,000. The derivative liability was a contingent payment based on the five-year average daily gold price (“Average Gold Price”) from the date of the acquisition. The derivative liability equals $23,148 for every dollar that the Average Gold Price exceeds $720 per troy ounce. The obligation to make the contingent payment was secured by a Deed of Trust over the rights of the Company in the purchased claims in favor of the vendors. On January 12, 2017, the Company paid $14,694,169 for the timely and full satisfaction of the final derivative payment, and on January 17, 2017, the Full Deed of Reconveyance releasing the Deed of Trust on the acquired property was recorded. As a consequence, the Company now fully owns the subject properties and the shares of Livengood Placer, Inc. and has no further liability to the vendors with respect to this acquisition.

The subject ground was previously vacant or was used for placer gold mining. No placer mineral reserves or mineral resources have been established on the ground subject to this agreement. However, records exist for 2,370 placer drill holes that have been completed on the subject ground between 1933 and 2011. Of these, the 945 holes completed between 1933 and 1984 were primarily 6” churn drill holes. The 1,425 drill holes completed between 1984 and 2000 were 8” RC rotary drill holes utilizing a center return tri-cone bit. All lands controlled by the Company, including the lands acquired pursuant to this agreement, were evaluated as appropriate for integration into the October 2016 Study for the Livengood Gold Project.

### Geology and Mineralization

The rocks at the Livengood Gold Project are part of the Livengood Terrane, an east–west belt, approximately 240 km (149 miles) long, consisting of tectonically interleaved assemblages of various ages. These assemblages include the Amy Creek Assemblage, a sequence of latest Proterozoic and/or early Paleozoic basalt, mudstone, chert, dolomite, and limestone. An early Cambrian ophiolite sequence of mafic and ultramafic sea floor rocks was thrust over the Amy Creek Assemblage and was, in turn, overthrust by a sequence of Devonian shale, siltstone, conglomerate, volcanic, and volcaniclastic rocks, which are the dominant host to the mineralization currently under exploration at the Livengood Gold Project. The Devonian assemblage was overthrust by a second klippe of Cambrian ophiolite rocks. All of these rocks are intruded by Cretaceous multiphase monzonitic and syenitic dikes and sills. Gold mineralization is spatially and temporally associated with these intrusive rocks.

Gold mineralization occurs in association with disseminated arsenopyrite and pyrite in volcanic, sedimentary, and intrusive rocks, and in quartz veins cutting the more competent lithologies, primarily volcanic rocks, sandstones, and, to a lesser degree, ultramafic rocks. Three principal stages of alteration are currently recognized, an early biotite stage, followed by albite-quartz, and a late sericite-quartz assemblage. Carbonate appears to have been introduced with and subsequent to these stages. Arsenopyrite and pyrite were introduced primarily during the albite-quartz and sericite-quartz stages. Gold correlates strongly with arsenic and occurs primarily within and on the margins of arsenopyrite and pyrite.

Mineralization is interpreted as intrusion-related, consistent with other gold deposits of the Tintina Gold Belt, and has a similar As-Sb geochemical association. Mineralization is controlled partly by lithologic units, but thrust-fold architecture was key to providing pathways for intrusive and associated hydrothermal fluids.

Local fault and contact limits to mineralization have been identified, but overall the deposit has not been closed off in any direction. The current resource and area drilled covers the most significant portion of the area with anomalous gold in surface soil samples, but still represents only about 25% of the total gold-anomalous area.

Among deposits of the Tintina Gold Belt, mineralization at the Livengood Gold Project is most similar to the dike and sill-hosted mineralization at the Donlin Creek deposit, where gold occurs in narrow quartz veins associated with dikes and sills of similar composition. The age of the intrusions and the genetic link between the mineralization and intrusive rocks are typical of those of other nearby gold deposits of the Tintina Gold Belt, which have been characterized as intrusion-related gold systems and for these reasons the Livengood Gold Project is best classified with them.

### History and Exploration

Gold was first discovered in the gravels of Livengood Creek in 1914. Subsequently, over 500,000 ounces of placer gold were produced and the small town of Livengood was established. From 1914 through the 1970’s, the primary focus of prospecting activity was placer deposits. Historically, prospectors considered Money Knob and the associated ridgeline the source of the placer gold. Prospecting, in the form of dozer trenches, was carried out for lode type mineralization in the vicinity of Money Knob primarily in the 1950’s. However, to date no significant production has been derived from lode gold sources.

The geology and mineral potential of the Livengood District have been investigated by state and federal agencies and explored by several companies over the past 40-plus years. Modern mapping and sampling investigations were initially carried out by the U.S. Geological Survey in 1967 as part of a heavy metal assessment program. Mapping completed in the course of this program recognized the essential rock relations, thrust faulting, and mineralization associated with Devonian clastic rocks, the thrust system and intrusive rocks. Since then, the Livengood placer deposits and the surrounding geology have featured in numerous investigations and mapping programs at various scales by the U.S. Geological Survey and the Alaska State Division of Geological and Geophysical Surveys.

In addition to individuals prospecting the area, since the 1970’s several mining companies, including Homestake, AMAX, Placer Dome, Cambior and AngloGold, have investigated the potential for lode gold mineralization beneath the Livengood placers and on the adjacent hillsides, including at Money Knob. Placer Dome’s work appears to have been the most extensive, but it was focused largely on the northern flank of Money Knob and the valley of Livengood Creek.

The most recent round of exploration of the Money Knob area began when AngloGold acquired the property in 2003 and undertook an 8-hole reverse circulation (RC) program on the Hudson-Geraghty lease. The results from this program were encouraging and were followed up with an expanded soil geochemical survey which identified gold-anomalous zones over Money Knob and to the east. Based on the results of this and prior (Cambior) soil surveys, 4 diamond core holes were drilled in late 2004. Results from these two AngloGold drill programs were deemed favorable but no further work was executed due to financial constraints and a shift in corporate strategy.

The Company acquired the Livengood Gold Project in 2006 from AngloGold and has advanced the soil sampling coverage, undertook to drill surface geochemical anomalies and conducted drilling campaigns on the Livengood Gold Project since that time.

In 2006, the Company conducted a 1,227m, seven-hole program and continued to demonstrate the presence of mineralization over a broader area. The 2007 campaign consisted of 15 diamond drill holes for a total of 4,411m. These holes focused on extending and defining the volcanic-hosted mineralization first recognized by AngloGold in 2003. However, as drilling progressed, it became clear that although mineralization is strongest in the volcanic rocks, it occurs in all rock types at Money Knob.

Based on favorable results in 2007, the 2008 program consisted of 29,150m of RC and 2,187m core drilling in 109 and 9 holes, respectively. The drill program was designed to improve definition and expand the resource calculated early in 2008 based on 2007 drill data. The 2008 drill program did not identify limits to mineralization in any direction. Instead, a thicker mineralized zone (up to 200m) was identified. In addition, this campaign highlighted the fact that mineralization occurs in all rock types, not just in Devonian volcanic rocks, indicating potential more widespread mineralization than envisioned prior to the 2008 drill program.

In 2009, the Company completed 12 diamond drill holes totaling 4,572m and 195 RC holes totaling 59,757m. Six of the diamond drill holes were drilled across the NNW-trending Core Zone in order to better understand the structural controls and to test the depth continuity of the mineralization. This drilling confirmed that the Core Zone is the locus of a swarm of 0.2 - 1.0m thick southerly dipping dikes. In addition, a number of larger (+10m thick) steeply dipping NNW-trending dikes were observed, suggesting that ENE extension may have occurred at about the time of dike magmatism. The RC holes were primarily targeted at grid infill drilling to improve resource estimation of the Core Zone and a step-out program that led to discovery and delineation of the Sunshine and Tower Zones.

In 2010, the Company completed 40 diamond drill holes totaling 13,631m and 198 RC holes totaling 56,550m. These holes, filled in between the Core and Sunshine Zones, expanded the SW Zone and infilled to 50m spacing in the Core and Sunshine Zones.

Nearly all drill holes at Money Knob have been drilled in a northerly direction at an inclination of -50 degrees (RC) and -60 degrees (core) in order to best intercept the south dipping structures and mineralized zones as close to perpendicular as possible. A few holes have been drilled in other directions to test other features and aspects of mineralization. Most exploration holes have been spaced at 75m apart along lines 75m apart, subsequent infill drilling in the center of 75m squares brings the nominal drill spacing to 50m for a significant portion of the deposit. Core is recovered using triple tube techniques to ensure good recovery (\>95%) and confidence in core orientation. RC holes are bored and cased for the upper 0-30m to prevent down hole contamination and to help keep the hole open for ease of drilling at greater depths.

In 2011, the Company continued with resource definition drilling, completing 26,163m of RC drilling and 11,468m of diamond drilling. Two areas of the deposit, the Core and Sunshine crosses, were selected for 15m-spaced RC in-fill drilling on crosses with north-south and east-west legs 150m in length. A third area, Area 50 in the Sunshine Zone, measuring 195m by 240m, was drilled on a 37.5m grid with alternating core and RC drilling. Two resources were generated for each volume using ordinary kriging on samples composited to 10m lengths: the first including those portions of the 50m grid drilling within the volume; and a second using both the grid and close-spaced drilling within the same volume. On average, the effect of the increased drilling density on tonnage, grade, and contained ounces of gold was less than 1% and confirmed the integrity of the previously reported resource estimate. In 2011, the Company broadened the scope of the field program to include 2,240m of exploration drilling outside the resource area, as well as 8,932m of geotechnical drilling and 1,192m of large diameter groundwater test wells.

In May 2012, the Company commenced an 18-hole program of condemnation drilling to either sterilize or establish the presence of significant mineralization in the area surrounding the Money Knob deposit. The purpose of the condemnation drilling program was to determine appropriate areas for infrastructure development. Additionally, four of these holes are also being used for hydrological studies. The program was completed in July with 3,065m in 19 holes.

Also in May 2012, the Company commenced multi-faceted drill programs consisting of hydraulic gradient, infrastructure, borrow source identification, and large-diameter wells for pump tests. The hydraulic gradient and infrastructure drilling consisted of 5,826m in 49 holes utilizing core drilling. The geotechnical and borrow source information was obtained from 2,695m drilled in 73 holes, utilizing core, sonic, and auger drilling methods. Seven large diameter wells have been drilled for a total of 1,031m.

The drill program from February through October 2012 totaled 15,731m in 199 holes.

No drill programs were completed during 2013.

The Company did not complete any material exploration at the Project in 2014, 2015 and 2016.

### Sample Preparation, Analyses and Security

The Company samples all holes from surface to total depth, using defined procedures. For RC samples, pulverized material is passed through a cyclone to separate solids from drilling fluids, then over a spinning conical splitter. The splitter is set to collect two identical splits of sample weighing 2-5 kg (4.4-11.0 pounds) each. Representative coarse material is collected and saved in chip trays for geological description. Samples are put in pre-numbered, bar-coded bags by the drill site crew. One sample is submitted for analysis, and one sample is kept for reference. Samples are secured on site and transported to a sample preparation facility operated by ALS Chemex in Fairbanks.

Core materials are collected at the drill site and placed in core boxes. Run blocks, orientation blocks and depths are placed in the boxes at site. The core is transported to a sample management facility at the Project, where it is described, then sawn in half. Half of the core is collected for assaying and half remains for reference. Core samples are weighed before shipping.

The Company’s geologic work program at Livengood was designed and is supervised by Chris Puchner, Chief Geologist of the Company, who is a qualified person as defined by NI 43-101. Mr. Puchner is responsible for all aspects of the work, including the quality control/quality assurance program. The quality assurance/quality control program implemented by the Company meets or exceeds industry standards. A quality assurance/quality control program includes insertion of blanks and standards (1/10 samples) and duplicates (1/20 samples). Blanks help assess the presence of any contamination introduced during sample preparation and help calibrate the low end of the assay detection limits. Commercial standards are used to assess the accuracy of the analyses. Duplicates help assess the homogeneity of the sample material and the overall sample variance. The Company has undertaken rigorous protocols to assure accurate and precise results. Among other methods, weights are tracked throughout the various steps performed in the laboratory to minimize and track errors. A group of 2,096 metallic screen fire assays performed in 2011 did not indicate any bias in the matching fire assays.

On-site Project personnel photograph the core from each individual borehole prior to preparing the split core. Duplicate RC drill samples are collected with one split sent for analysis. Representative chips are retained for geological logging. On-site personnel at the Project log and track all samples prior to sealing and shipping. All sample shipments are sealed and shipped to ALS Chemex in Fairbanks, Alaska, for preparation and then on to ALS Chemex in Reno, Nevada, or Vancouver, B.C., for assay. ALS Chemex’s quality system complies with the requirements for the International Standards ISO 9001:2000 and ISO 17025:1999. Analytical accuracy and precision are monitored by the analysis of reagent blanks, reference material and replicate samples. Quality control is further assured by the use of international and in-house standards. Finally, representative blind duplicate samples are forwarded to ALS Chemex and an ISO compliant third party laboratory for additional quality control.

Data entry and database validation procedures have been checked and found to conform to industry practices. Procedures are in place to minimize data entry errors. These include pre-numbered, pre-tagged, bar-coded bags, and bar-coded data entry methods which relate all information to sample and drill interval information. Likewise, data validation checks are run on all information used in the geologic modeling and resource estimation process. Database entries for a random sample (10%) of drill holes used for the resource estimate were checked against the original assay certificates by one of the independent authors of the October 2016 Study and the error rate was found to be within acceptable limits.

Analysis of assay data from core and RC sampling has been performed to check for downhole contamination of RC and to compare the data distributions produced by the two methods. Analysis of RC data has not indicated cyclic down hole contamination. Decay analysis conducted on both core drilling and RC drilling indicates similar patterns of monotonic grade increase or decrease. Comparison of the grade distributions between core and RC data were conducted using Quantile-Quantile plots, and simulation of population means for different numbers of samples. The comparison indicated that the mean of all core data was 4% lower than RC data. Comparison of core and RC data below the water table showed similar population means, suggesting that down hole contamination was not occurring.

Core and RC check samples have been collected during each drilling campaign by independent third parties. Results from these samples, as well as blanks and standards included, are consistent with the Company’s initial results. This includes a similar increase in variance for samples at higher grades, a pattern consistent with nugget effect. No systematic high or low bias has been observed.

### October 2016 Study

In October, 2016, the Company filed the October 2016 Study with respect to the Livengood Gold Project, which indicates that the Project generates a minimal positive return at a gold price of $1,250 per ounce. At the current gold price, the Project as contemplated in the October 2016 Study is not commercially viable. Readers are encouraged to review the entire October 2016 Study on SEDAR, with particular emphasis on the sensitivity analyses contained therein. Readers are cautioned that a NI 43-101 report filed on SEDAR by the Company in September of 2013 is no longer considered current and should therefore no longer be relied upon by investors.

### Environmental Studies, Permitting and Social and Community Impacts

The Livengood Gold Project is currently operating within compliance of all environmental regulations that apply during the exploration stage of major mineral projects. The Company has received all necessary exploration permits for activities such as trenching, drill road building and drilling. These permits are also reviewed by related state and federal agencies that can comment and require specific changes to the proposed work plans to minimize impacts on the environment. The permitting process for major exploration projects generally requires 30-60 days for processing. The Company currently has all necessary permits with respect to its exploration activities in Alaska. Although the Company has never had an issue with the timely processing of exploration permits there can be no assurances that delays in permit approval will not occur. Reclamation of surface disturbance associated with exploration activities is conducted concurrently where required.

The Company has been conducting extensive, multi-disciplinary environmental baseline studies in and around the Project area since 2008 in order to understand the current environmental conditions and to allow Project design to be optimized to minimize potential environmental effects. The environmental baseline programs conducted or currently underway at the Project include:

- surface water and hydrology;
- groundwater hydrogeology;
- geohydrology;
- wetlands and vegetation;
- meteorology and air quality;
- aquatic life and resources;
- wildlife and habitat;
- cultural resources;
- rock characterization; and
- geochemical characteristics.

Based on review of the studies completed to date, The Company believes that there are no known environmental issues that are anticipated to materially impact the Company’s ability to conduct mining operations at the Project.

Looking forward to potential project development, a site-specific monitoring plan and water management plan for both operations and post mine closure will be developed in conjunction with detailed engineering and project permit planning. Development of the Livengood Gold Project will require a number of state and federal permits. Federal permits will be issued pursuant to the National Environmental Policy Act (NEPA) and Council of Environmental Quality (CEQ). In fulfillment of the NEPA requirements, the Livengood Gold Project will be required to prepare an Environmental Impact Statement. Although at this time it is unknown which department will become the lead federal agency, the State of Alaska is expected to take a cooperating role to coordinate the NEPA review with the State permit process. Actual permitting timelines are controlled by the NEPA review and U.S. Federal and State agency decisions. There are no municipal or community agreements required for the Livengood Gold Project.

## Legal proceedings

As filed, 337 characters.

We are periodically a party to or otherwise involved in legal proceedings arising in the normal course of business. Management does not believe that there is any pending or threatened proceeding against us which, if determined adversely, would have a material adverse effect on our financial position, liquidity or results of operations.

## Management's discussion and analysis

As filed, 26,885 characters.

### Current Business Activities

### General

#### Livengood Gold Project Developments

During the year ended December 31, 2016 and to the date of this Annual Report on Form 10-K, the Company progressed on a number of opportunities for optimization and reducing the costs of building and operating a mine at the Project. Outside consultants were retained to conduct additional metallurgical tests and engineering, including confirmation of the flow sheet and optimizing the operating costs. These inputs were used to prepare the October 2016 Study, which evaluated several scenarios, ultimately selecting a project that will process 52,600 tons per day and produce 6.8 million ounces of gold over 23 years. This improved configuration has reduced the capital costs (“CAPEX”) by 34% or $950 million to $1.84 billion, the process operating cost (“process OPEX”) by 28% or $2.97 per ton to $7.48 per ton, and the all-in costs to $1,247 per ounce, all as compared to the 100,000 tons per day project evaluated in the September 2013 Feasibility Study.

### 2016

#### Financing

On December 28, 2016, the Company closed a non-brokered private placement financing through the issuance of 45,833,334 common shares issued at $0.48 per share for gross proceeds of $22.0 million. Total share issuance costs for this non-brokered private placement financing amounted to $146,735. The Company has used $14.7 million of the net proceeds for the final payment with respect to acquisition of certain mining claims and related rights in the vicinity of the Livengood Gold Project, with the balance to be used for continuation of optimization studies to further improve and de-risk the Project, required environmental baseline studies, and for general working capital purposes.

#### Management Changes

On January 23, 2017, the ITH Board approved a management transition plan, which was implemented on January 31, 2017, in which Karl Hanneman, currently the Chief Operating Officer (COO), became the Chief Executive Officer (CEO), managing both the CEO and COO responsibilities, and Tom Irwin, the previous CEO, transitioned into a part-time position of Senior Advisor prior to his being considered for nomination to the Board at the Company's May 2017 Annual General Meeting (AGM).

#### Appointment of Directors

On December 28, 2016, Marcelo Kim was appointed as an additional director of ITH, and as the Chair of the Board. Mr. Kim is a Partner at Paulson & Co. Inc., the Company’s major shareholder, where he oversees global natural resource investments. Commencing from the 2017 AGM of the Company’s shareholders, Paulson & Co. Inc. will have the right to nominate Mr. Kim and one other individual to stand for election to the Board. Steve Lang, who has served as the Board Chair since January 2014, was appointed as the lead independent director for the Company upon the appointment of Mr. Kim as Chair.

#### Other Developments

On January 12, 2017, the Company paid $14.7 million for the timely and full satisfaction of the final derivative payment due with respect to acquisition of certain mining claims and related rights in the vicinity of the Livengood Gold Project. On January 17, 2017, the Full Deed of Reconveyance releasing the Deed of Trust on the acquired property was recorded and the Company now fully owns this property and has no further liability with respect to this acquisition.

### 2017 Outlook

#### 2017 Work Program Details

On January 23, 2017 the Board approved a 2017 budget of $6.3 million. The work program incorporated in this budget will seek to build upon the Project improvements announced with the October 2016 Study, focusing on improving the mineralization and alteration models used to support the resource block model, evaluating alternative block models for production schedule opportunities, and completion of several phases of metallurgical work to better define and optimize the flowsheet and recovery parameters. The 2017 work program has been specifically designed to target those aspects of the Project that could deliver the highest NPV increase for the least expenditure. Preliminary work on the block model and metallurgical recovery variability indicates a potential NPV benefit of up to $280 million and $100 million respectively (see section below 2017 Work Program Details). The engineering firm of BBA Inc. (BBA), who provided support for the 2016 Pre-feasibility Study (the “2016 PFS”), will be retained to continue work in the 2017 program. Work is also planned to advance the environmental baseline efforts needed to support future permitting.

**However, the Company cautions that, until this multi-phase metallurgical program and the updated block model are completed and the results thereof are incorporated into a revised financial model, there can be no assurance that the overall recovery increases, potential process optimizations, or block model improvements, will, in fact, be realized, or that any such increases, optimizations or improvements will have the overall effect suggested above.**

The Company remains open to a strategic alliance to help support the future development of the Project while considering all other appropriate financing options. The size of the gold resource, the favorable location, and the proven team are some of the reasons the Company would potentially attract a strategic partner with a long term development horizon who understands the Project is highly leveraged to gold prices.

The Company has sufficient funds to complete the test programs and engineering work underway.

### Results of Operations

### Summary of Quarterly Results

| Description | December 31, 2016 | September 30, 2016 | June 30, 2016 | March 31, 2016 |
| --- | ---: | ---: | ---: | ---: |
| Net loss | $(1,109,733) | $(1,524,589) | $(2,068,850) | $(2,487,456) |
| Basic and diluted net loss per common share | $(0.01) | $(0.01) | $(0.02) | $(0.02) |

|  | December 31, 2015 | September 30, 2015 | June 30, 2015 | March 31, 2015 |
| --- | ---: | ---: | ---: | ---: |
| Net loss | $(1,119,972) | $(1,007,489) | $(2,048,868) | $(636,495) |
| Basic and diluted net loss per common share | $(0.01) | $(0.01) | $(0.02) | $(0.01) |

Significant fluctuations in the Company’s quarterly net loss have mainly been the result of changes in operating costs and the valuation of the Company’s derivative liability. The fluctuation in the derivative liability was caused by changes in the price of gold during the period along with the expected price of gold through the term of the derivative liability, which was paid in January 2017. The following table presents the unrealized gain or loss on the valuation of the derivative for each quarterly period during the years ended December 31, 2016 and 2015:

| Three months ended: | 2016 Unrealized Gain/(Loss) | 2015 Unrealized Gain/(Loss) |
| --- | ---: | ---: |
| March 31 | $(700,000) | $200,000 |
| June 30 | $(100,000) | $(100,000) |
| September 30 | $(100,000) | $400,000 |
| December 31 | $105,831 | $300,000 |

41

### Year ended December 31, 2016 compared to Year ended December 31, 2015

The Company had cash and cash equivalents of $22,466,493 at December 31, 2016 compared to $6,493,486 at December 31, 2015. The Company incurred a net loss of $7,190,628 for the year ended December 31, 2016, compared to a net loss of $4,812,824 for the year ended December 31, 2015. The following discussion highlights certain selected financial information and changes in operations between the year ended December 31, 2016 and the year ended December 31, 2015.

Mineral property expenditures were $2,648,631 for the year ended December 31, 2016 compared to $2,381,868 for the year ended December 31, 2015. The increase of $266,763 is due to increased expenditures for metallurgical studies and engineering partially offset by the Company limiting field activities to the continuation of critical environmental baseline work while moving forward with a multi-phase metallurgical test work program.

Share-based payment charges were $108,526 during the year ended December 31, 2016 compared to $540,468 during the year ended December 31, 2015. The decrease in share-based payment charges during the period was mainly the result of a reduction in the fair value of options granted in 2015 as compared to 2014. The Company granted no options during the year ended December 31, 2016 compared to 2,135,200 options during the year ended December 31, 2015. At December 31, 2016 there was unrecognized compensation expense of $38,644 related to non-vested options outstanding. The cost is expected to be recognized over a weighted-average remaining period of approximately 0.21 years.

Share based payment charges were allocated as follows:

| Expense category: | Year ended December 31, 2016 | Year ended December 31, 2015 |
| --- | ---: | ---: |
| Consulting | $25,013 | $113,150 |
| Investor relations | 6,603 | 27,223 |
| Wages and benefits | 76,910 | 400,095 |
|  | $108,526 | $540,468 |

Excluding share-based payment charges of $76,910 and $400,095, respectively, wages and benefits decreased to $2,119,681 for the year ended December 31, 2016 from $2,159,515 for the year ended December 31, 2015. The closure of the Colorado office during 2015 contributed to lower wages and benefits expenses partially offset by higher healthcare premiums as a result of the base for the employee healthcare programs moving from Colorado to Alaska.

Excluding share-based payment charges of $25,013 and $113,150, respectively, consulting fees were $238,321 for the year ended December 31, 2016 compared to $305,274 for the year ended December 31, 2015. The decrease of $66,953 is primarily due to lower consulting fees paid for Chief Financial Officer services during 2016 as compared to 2015.

Excluding share-based payments, all other operating expense categories reflected only moderate changes period over period.

Other items amounted to other expense of $1,076,740 during the year ended December 31, 2016 compared to other income of $1,637,352 in the year ended December 31, 2015. Total other expense in 2016 resulted from the unrealized loss on the revaluation of the derivative liability of $794,169. This unrealized loss was caused by the increase in the price per ounce of gold during 2016 and is compared to an unrealized gain of $800,000 during 2015 which resulted from a decrease in the price of gold during 2015. In addition to the unrealized loss on the derivative liability, the Company had a foreign exchange loss of $340,551 during the year ended December 31, 2016 compared to a gain of $990,690 during the year ended December 31, 2015 as a result of the impact of exchange rates on certain of the Company’s U.S. dollar cash balances. The average exchange rate during the year ended December 31, 2016 was C$1 to US$0.7548 compared to C$1 to US$0.7820 for the year ended December 31, 2015.

Available-for-sale securities were deemed not to be impaired for the year ended December 31, 2016 compared to a loss of $219,402 related to the other than temporary impairment of certain available-for-sale securities during the year ended December 31, 2015.

### Year ended December 31, 2015 compared to Year ended December 31, 2014

The Company had cash and cash equivalents of $6,493,486 at December 31, 2015 compared to $13,521,473 at December 31, 2014. The Company incurred a net loss of $4,812,824 for the year ended December 31, 2015, compared to a net loss of $7,767,096 for the year ended December 31, 2014. The following discussion highlights certain selected financial information and changes in operations between the year ended December 31, 2015 and the year ended December 31, 2014.

Mineral property expenditures were $2,381,868 for the year ended December 31, 2015 compared to $2,631,974 for the year ended December 31, 2014. The decrease of $250,106 is due to the Company limiting field activities to the continuation of critical environmental baseline work while moving forward with a multi-phase metallurgical test work program.

Professional fees were $230,227 for the year ended December 31, 2015 compared to $389,218 for the year ended December 31, 2014. The decrease of $158,991 is primarily due to the Company negotiating lower rates in 2015 for various third party-provided professional fees such as legal and accounting fees.

Share-based payment charges were $540,468 during the year ended December 31, 2015 compared to $1,285,385 during the year ended December 31, 2014. The decrease in share-based payment charges during the period was mainly the result of more stock option granted in 2014 as compared to 2015 and a lower fair value of options in 2015. The Company granted 2,135,200 options during the year ended December 31, 2015 compared to 2,480,000 options during the year ended December 31, 2014. At December 31, 2015 there was unrecognized compensation expense of $118,980 related to non-vested options outstanding. The cost is expected to be recognized over a weighted-average remaining period of approximately 0.82 years.

Share based payment charges were allocated as follows:

| Expense category: | Year ended December 31, 2015 | Year ended December 31, 2014 |
| --- | ---: | ---: |
| Consulting | $113,150 | $91,584 |
| Investor relations | 27,223 | 67,923 |
| Wages and benefits | 400,095 | 1,125,878 |
|  | $540,468 | $1,285,385 |

Excluding share-based payment charges of $400,095 and $1,125,878, respectively, wages and benefits decreased to $2,159,515 for the year ended December 31, 2015 from $2,820,873 for the year ended December 31, 2014. A decrease in severance expense of approximately $285,000 from 2014 to 2015 along with decreased personnel as a result of the resignation of the Company’s Chief Financial Officer effective December 31, 2014 and the closure of the Colorado office during 2015 contributed to lower wages and benefits expenses.

All other operating expense categories showed moderate decreases period over period reflecting the Company’s efforts to reduce spending.

Other items amounted to other income of $1,637,352 during the year ended December 31, 2015 compared to other income of $606,192 in the year ended December 31, 2014. Total other income in 2015 resulted from the unrealized gain on the revaluation of the derivative liability of $800,000. This unrealized gain was caused by the further decrease in the price per ounce of gold during 2015 and is compared to an unrealized gain of $100,000 during 2014 which resulted from a lesser decrease in the price of gold during 2014. In addition to the unrealized gain on the derivative liability, the Company had a foreign exchange gain of $990,690 during the year ended December 31, 2015 compared to a gain of $453,161 during the year ended December 31, 2014 as a result of the impact of exchange rates on certain of the Company’s U.S. dollar cash balances. The average exchange rate during the year ended December 31, 2015 was C$1 to US$0.7820 compared to C$1 to US$0.9054 for the year ended December 31, 2014.

The increase in other income was partially offset by a loss of $219,402 related to the other than temporary impairment of certain available-for-sale securities during the year ended December 31, 2015. The available-for-sale securities were deemed to be other than temporarily impaired based on the fair market value of the securities combined with a continued lack of liquidity.

### Liquidity and Capital Resources

The Company has no revenue generating operations from which it can internally generate funds. To date, the Company’s ongoing operations have been predominantly financed through sale of its equity securities by way of private placements and the subsequent exercise of share purchase and broker warrants and options issued in connection with such private placements. However, the exercise of warrants/options is dependent primarily on the market price and overall market liquidity of the Company’s securities at or near the expiry date of such warrants/options (over which the Company has no control) and therefore there can be no guarantee that any existing warrants/options will be exercised. There are currently no warrants outstanding.

As at December 31, 2016, the Company reported cash and cash equivalents of $22,466,493 compared to $6,493,486 at December 31, 2015. Net proceeds from financing of approximately $21.9 million partially offset by expenditures on the Livengood Gold Project of approximately $6.5 million and a negative foreign currency translation impact of approximately $0.5 million resulted in an increase in cash and cash equivalents of approximately $16.0 million. The Company continues to utilize its cash resources to pursue opportunities identified in the October 2016 Study, to fund environmental activities required for preservation of baseline database and future permitting as well as to complete corporate administrative requirements.

The Company had no cash flows from investing activities during the years ended December 31, 2016 and December 31, 2015.

Financing activities during the year ended December 31, 2016 provided proceeds of $21,853,265 from the closing of a non-brokered private placement of common shares in December 2016. Total common shares issued in the financing were 45,833,334 at a price of $0.48 for gross proceeds of $22.0 million. Total share issuance costs were $146,735. The Company had no cash flows from financing activities during the year ended December 31, 2015.

As at December 31, 2016, the Company had working capital of $7,588,867 compared to working capital of $6,169,233 at December 31, 2015. The Company expects that it will operate at a loss for the foreseeable future, but believes the current cash and cash equivalents will be sufficient for it to complete its anticipated 2017 work plan at the Livengood Gold Project and satisfy its currently anticipated general and administrative costs through the 2017 fiscal year. To advance the Livengood Gold Project towards permitting and development, the Company anticipates maintaining certain essential development activities for the fiscal year ending December 31, 2017. These essential activities include maintaining environmental baseline data that in its absence could materially delay future permitting of the Livengood Gold Project.

The Company will require significant additional financing to continue its operations (including general and administrative expenses) in connection with advancing activities at the Livengood Gold Project and the development of any mine that may be determined to be built at the Livengood Gold Project, and there is no assurance that the Company will be able to obtain the additional financing required on acceptable terms, if at all. In addition, any significant delays in the issuance of required permits for the ongoing work at the Livengood Gold Project, or unexpected results in connection with the ongoing work, could result in the Company being required to raise additional funds to advance permitting efforts. The Company’s review of its financing options includes pursuing a future strategic alliance to assist in further development, permitting and future construction costs, although there can be no assurance that any such strategic alliance will, in fact, be realized.

Despite the Company’s success to date in raising significant equity financing to fund its operations, there is significant uncertainty that the Company will be able to secure any additional financing in the current or future equity markets. See “Risk Factors – We will require additional financing to fund exploration and, if warranted, development and production. Failure to obtain additional financing could have a material adverse effect on our financial condition and results of operation and could cast uncertainty on our ability to continue as a going concern.” The quantity of funds to be raised and the terms of any proposed equity financing that may be undertaken will be negotiated by management as opportunities to raise funds arise. Specific plans related to the use of proceeds will be devised once financing has been completed and management knows what funds will be available for these purposes. Due to this uncertainty, if the Company is unable to secure additional financing, it may be required to reduce all discretionary activities at the Project to preserve its working capital to fund anticipated non-discretionary expenditures beyond the 2017 fiscal year.

Other than cash held by its subsidiaries for their immediate operating needs in the United States, all of the Company’s cash reserves are on deposit with a major Canadian chartered bank. The Company does not believe that the credit, liquidity or market risks with respect thereto have increased as a result of the current market conditions.

### Contractual Obligations and Commitments

The following table discloses, as of December 31, 2016, the Company’s contractual obligations, including anticipated mineral property payments and work commitments. Under the terms of the Company’s mineral property purchase agreements, mineral leases and the terms of the unpatented mineral claims held by it, the Company is required to make certain scheduled acquisition payments, incur certain levels of expenditures, make lease or advance royalty payments, make payments to government authorities and incur assessment work expenditures as summarized in the table below in order to maintain and preserve the Company’s interests in the related mineral properties. If the Company is unable or unwilling to make any such payments or incur any such expenditures, it is likely that the Company would lose or forfeit its rights to acquire or hold the related mineral properties. The following table assumes that the Company retains the rights to all of its current mineral properties, but does not exercise any lease purchase or royalty buyout options:

|  | Payments Due by Year 2017 | 2018 | 2019 | 2020 | 2021 | 2022 and beyond | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Livengood Property Purchase(1) | $14,694,169 | $- | $- | $- | $- | $- | $14,694,169 |
| Mineral Property Leases(2) | 416,678 | 426,653 | 431,703 | 436,829 | 442,031 | 447,311 | 2,601,205 |
| Mining Claim Government Fees | 114,925 | 114,925 | 114,925 | 114,925 | 114,925 | 114,925 | 689,550 |
| Total | $15,225,772 | $541,578 | $546,628 | $551,754 | $556,956 | $562,236 | $17,984,924 |

1\. The amount payable in January 2017 of $14,694,169 represents the fair value of the Company’s derivative liability as at December 31, 2016 based on the five-year average daily gold price for the period of December 13, 2011 through December 12, 2016. On January 12, 2017, this amount was paid by the Company for the timely and full satisfaction of the final derivative payment.

2\. Does not include required work expenditures, as it is assumed that the required expenditure level is significantly below the work which will actually be carried out by the Company. Does not include potential royalties that may be payable (other than annual minimum royalty payments).

### Off-Balance Sheet Arrangements

The Company does not have any off balance sheet arrangements.

### Critical Accounting Policies

### Mineral properties and exploration and evaluation expenditures

The Company’s mineral project is currently in the exploration and evaluation phase. Mineral property acquisition costs are capitalized when incurred. Mineral property exploration costs are expensed as incurred. At such time that the Company determines that a mineral property can be economically developed, subsequent mineral property expenses will be capitalized during the development of such property.

The Company assesses interests in exploration properties for impairment when facts and circumstances suggest that the carrying amount of an asset may exceed its recoverable amount. Impairment analysis includes assessment of the following circumstances: a significant decrease in the market price of a long-lived asset or asset group; a significant adverse change in the extent or manner in which a long-lived asset or asset group is being used or in its physical condition; a significant adverse change in legal factors or in the business climate that could affect the value of a long-lived asset or asset group, including an adverse action or assessment by a regulator; an accumulation of costs significantly in excess of the amount originally expected for the acquisition or construction of a long-lived asset or asset group; a current-period operating or cash flow loss combined with a history of operating or cash flow losses or a projection or forecast that demonstrates continuing losses associated with the use of a long-lived asset or asset group; a current expectation that, more likely than not, a long-lived asset or asset group will be sold or otherwise disposed of significantly before the end of its previously estimated useful life. The term more likely than not refers to a level of likelihood that is more than 50%.

### Derivatives

Derivative financial liabilities include the Company’s future contingent payment based on the five-year average daily gold price from the date of the acquisition on December 13, 2011 through December 12, 2016. Derivatives are initially recognized at their fair value on the date the derivative contract is entered into and are subsequently re-measured at their fair value at each reporting period with changes in the fair value recognized in profit and loss. Fluctuations in the Company’s derivative liability are driven by the price of gold during the term of the liability. On January 12, 2017, the Company paid $14,694,169 for the timely and full satisfaction of the final derivative payment due with respect to the acquisition of certain mining claims and related rights in the vicinity of the Livengood Gold Project. On January 17, 2017, the Full Deed of Reconveyance releasing the Deed of Trust on the acquired property was recorded and the Company is now in full ownership and has no further liability with respect to this acquisition.

### Stock-based compensation

The Company follows the provisions of Financial Accounting Standards Board (“FASB”) Accounting Standards Codification Section 718 “Compensation - Stock Compensation”, which establishes accounting for equity based compensation awards to be accounted for using the fair value method. The Company uses the Black-Scholes option pricing model to determine the grant date fair value of the awards. Compensation expense is measured at the grant date and recognized over the requisite service period, which is generally the vesting period.

### Recently Adopted Accounting Policies

For a description of recently adopted accounting policies, please see Note 2 – *Summary Of Significant Accounting Policies* within our Notes to Consolidated Financial Statements in Item 8 of this Annual Report on Form 10-K.

## Market risk

As filed, 3,303 characters.

The Company has exposure to market risk in areas of interest rate risk, foreign currency exchange rate risk, concentration of credit risk and other price risk.

### Interest Rate Risk

Interest rate risk consists of the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates.

The Company’s cash and cash equivalents consists of cash and cash equivalents held in bank accounts in the United States and Canada and short term deposit certificates or Guaranteed Investment Certificates with a major Canadian financial institution that earn interest at variable interest rates. Future cash flows from interest income on cash and cash equivalents will be affected by interest rate fluctuations. Due to the short-term nature of these financial instruments, fluctuations in market rates do not have a significant impact on estimated fair values.

At December 31, 2016, the Company held a total of $22,466,493 in cash and cash equivalents which include interest bearing accounts and Guaranteed Investment Certificates.

The Company manages interest rate risk by maintaining an investment policy that focuses primarily on preservation of capital and liquidity. The Company’s sensitivity analysis suggests that a 0.5% change in interest rates would affect interest income by approximately $32,500.

### Foreign Currency Risk

The Company is exposed to foreign currency risk to the extent that certain monetary financial instruments and other assets are denominated in Canadian dollars. As the majority of the Company’s assets are denominated in U.S. dollars, currency risk is limited to those Canadian cash balances. The Company has not entered into any foreign currency contracts to mitigate this risk. Over the past twelve months, the U.S. to Canadian dollar exchange rate has fluctuated as much as 8%. The Company’s sensitivity analysis suggests that a consistent 8% change in the absolute rate of exchange for the Canadian dollar would affect net assets by approximately $36,000. Furthermore, depending on the amount of cash held by the Company in Canadian dollars at the end of each reporting period using the period end exchange rate, significant changes in the exchange rates could cause significant changes to the currency translation amounts recorded to accumulated other comprehensive income.

As at December 31, 2016, Canadian dollar balances were converted at a rate of C$1 to $0.7448.

### Credit Risk

Concentration of credit risk exists with respect to the Company’s cash and cash equivalents as all amounts are held at one major Canadian financial institution. Credit risk with regard to cash held in the United States at U.S. subsidiaries is mitigated as the amount held in the United States is only sufficient to cover short-term cash requirements. With respect to receivables at December 31, 2016, the Company is not exposed to significant credit risk as the receivables are principally interest accruals.

### Other Price Risk

Other price risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market prices, other than those arising from interest rate risk or foreign exchange risk. The Company’s investment in marketable securities is exposed to such risk.

## Controls and procedures

As filed, 3,908 characters.

### Disclosure Controls and Procedures

As of December 31, 2016, an evaluation was carried out under the supervision of and with the participation of the Company’s management, including the Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Exchange Act). Based on the evaluation, the Chief Executive Officer and the Chief Financial Officer have concluded that, as of December 31, 2016, the Company’s disclosure controls and procedures were effective in ensuring that: information required to be disclosed in reports filed or submitted to the SEC under the Exchange Act is (i) recorded, processed, summarized and reported within the time periods specified in applicable rules and forms and (ii) accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, in a manner that allows for timely decisions regarding required disclosures.

The effectiveness of our or any system of disclosure controls and procedures, however well designed and operated, can provide only reasonable assurance that the objectives of the system will be met and is subject to certain limitations, including the exercise of judgment in designing, implementing and evaluating controls and procedures and the assumptions used in identifying the likelihood of future events.

### Management’s Annual Report on Internal Control over Financial Reporting

Management is responsible for establishing and maintaining adequate internal control over financial reporting, as defined in Exchange Act Rule 13a-15(f). Management evaluated, with the participation of our Chief Executive Officer and Chief Financial Officer, the effectiveness of internal control over financial reporting as of December 31, 2016. In conducting this evaluation, management used the framework established by the Committee of Sponsoring Organizations of the Treadway Commission as set forth in Internal Control – Integrated Framework (2013). Based on this evaluation under the framework in Internal Control – Integrated Framework (2013), management concluded that internal control over financial reporting was effective as of December 31, 2016.

Because of its inherent limitations, a system of internal control over financial reporting may not prevent or detect misstatements. A control system, no matter how well designed and operated, can provide only reasonable, not absolute, assurance that the control system’s objectives will be met. Further, the design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that all control issues and instances of fraud, if any, have been detected. The design of any system of controls is based in part upon certain assumptions about the likelihood of future events, and there can be no assurance that any design will achieve its stated objectives under all future conditions.

This Annual Report on Form 10-K does not include an attestation report of the Company’s independent public accounting firm regarding internal control over financial reporting. Management’s report was not subject to attestation by the Company’s independent public accounting firm pursuant to rules of the Securities and Exchange Commission that permit the Company to provide only management’s report in this Annual Report on Form 10-K.

### Changes in Internal Control over Financial Reporting

There were no changes in internal controls over financial reporting during the fourth quarter ended December 31, 2016 that have materially, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

Filed Mar 15, 2017.
Source: SEC EDGAR, the filing index for accession 0001279569-17-000496. Last ingested by Listed: Nov 11, 2026, 03:17 ET. No prices; not investment advice.