# Blue Dolphin Energy Co: Form 10-Q for the period ended Mar 31, 2014

- Company: [Blue Dolphin Energy Co](/companies/bdco.md) (CIK 793306)
- Form: 10-Q
- Filed: 2014-05-15
- Accepted by EDGAR: May 15, 2014, 14:05 ET
- Period: 2014-03-31
- Accession: 0001354488-14-002640
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/793306/000135448814002640/bdco_10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/793306/000135448814002640/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2014-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2014-01-01 to 2014-03-31 | $120.4m | us-gaap:Revenues |
| Operating income | 3 months, 2014-01-01 to 2014-03-31 | $6.2m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2014-01-01 to 2014-03-31 | $253.8k | us-gaap:InterestExpense |
| Income tax | 3 months, 2014-01-01 to 2014-03-31 | −$202.4k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2014-01-01 to 2014-03-31 | $6.2m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2014-01-01 to 2014-03-31 | $0.59 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2014-01-01 to 2014-03-31 | $0.59 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2014-01-01 to 2014-03-31 | 10,430,973 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2014-01-01 to 2014-03-31 | $5.2m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | at 2014-03-31 | $295.9k | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2014-03-31 | $16.5m | us-gaap:AssetsCurrent |
| Total assets | at 2014-03-31 | $54.5m | us-gaap:Assets |
| Current liabilities | at 2014-03-31 | $22.6m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2014-03-31 | $36.2m | us-gaap:Liabilities |
| Long-term debt | at 2014-03-31 | $9.8m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2014-03-31 | $9.8m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2014-03-31 | $18.3m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 53,126 characters.

*The following discussion of our financial condition and results of operations should be read in conjunction with the risk factors, unaudited consolidated financial statements and notes included hereto, as well as the audited consolidated financial statements and notes thereto included in our previously filed Annual Report on Form 10-K for the year ended December 31, 2013 (the “Annual Report”). In this document, the words “Blue Dolphin,” “we,” “us” and “our” refer to Blue Dolphin Energy Company and its subsidiaries.*

### Forward Looking Statements

As provided by the safe harbor provisions of the Private Securities Litigation Reform Act of 1995, certain statements included throughout this Quarterly Report on Form 10-Q, and in particular under the sections entitled “Part I, Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations” and “Part II, Item 1A. Risk Factors” are forward-looking statements that represent management’s beliefs and assumptions based on currently available information. Forward-looking statements relate to matters such as our industry, business strategy, goals and expectations concerning our market position, future operations, margins, profitability, capital expenditures, liquidity and capital resources and other financial and operating information. We have used the words “anticipate,” “assume,” “believe,” “budget,” “continue,” “could,” “estimate,” “expect,” “intend,” “may,” “plan,” “potential,” “predict,” “project,” “will,” “future” and similar terms and phrases to identify forward-looking statements.

Forward-looking statements reflect our current expectations regarding future events, results or outcomes. These expectations may or may not be realized. Some of these expectations may be based upon assumptions or judgments that prove to be incorrect. In addition, our business and operations involve numerous risks and uncertainties, many of which are beyond our control, which could result in our expectations not being realized, or materially affect our financial condition, results of operations and cash flows.

Actual events, results and outcomes may differ materially from our expectations due to a variety of factors. Although it is not possible to identify all of these factors, they include, among others, the following:

- changes in the general economic conditions;
- changes in the underlying demand for our products;
- fluctuations of crude oil inventory costs and refined petroleum products inventory prices and their effect on our refining margins;
- our dependence on Genesis Energy, LLC (“Genesis”) and its affiliates for continued financing, sourcing of crude oil inventory and marketing of our refined petroleum products;
- the early termination of our agreements with Genesis and its affiliates;
- our dependence on Lazarus Energy Holdings, LLC (“LEH”) for continued financing and management of all of our subsidiaries and the operation of all of our assets, including the Nixon Facility, pursuant to the Management Agreement;
- our ability to generate sufficient funds from operations or obtain financing from other sources;
- failure to comply with certain financial covenants related to certain of our long-term indebtedness;
- regulatory changes that reduce the allowable sulfur content for commercially sold diesel in the United States, which will require us to incur significant capital upgrades and could have a material adverse effect on our results of operations, financial condition and cash flows;
- availability and cost of renewable fuels for blending and Renewable Identification Numbers (“RINs”) to meet Renewable Fuel Standards ("RFS") obligations;
- strict laws and regulations regarding employee and business process safety to which we are subject, the compliance failure of which could have a material adverse effect on our results of operations and financial condition;
- potential increased indebtedness, which may reduce our financial flexibility;
- regulatory restrictions on greenhouse gas emissions, which could force us to incur increased capital and operating costs and could have a material adverse effect on our results of operations and financial condition;
- access to less than desired levels of crude oil for processing at the Nixon Facility;
- our dependence on a small number of customers for a large percentage of our revenues;
- accidents, interruptions in transportation, inclement weather or other events that can cause unscheduled shutdowns or otherwise adversely affect our operations;

26

- potential downtime of the Nixon Facility, which could result in lost margin opportunity, increased maintenance expense, increased inventory, and a reduction in cash available for payment of our obligations;
- the geographic concentration of the Nixon Facility, which creates a significant exposure risk to the regional economy;
- competition from larger companies;
- infrastructure limitations;
- dangers inherent in our operations, such as fires and explosions, which could cause disruptions and expose us to potentially significant losses, costs and liabilities and significantly reduce our liquidity;
- the effects of Genesis’ hedging of our refined petroleum products and crude oil inventory and exposure to the risks associated with volatile crude oil prices;
- retention of key personnel;
- insurance coverage that may be inadequate or expensive;
- our potential reorganization from a publicly traded “C” corporation to a publicly traded master limited partnership;
- performance of third-party operators for our oil and gas properties;
- costs and collateral associated with abandonment of our pipelines and oil and gas properties; and
- changes in and compliance with taxes, which could adversely affect our performance.

Any one of these factors or a combination of these factors could materially affect our future results of operations and could influence whether any forward-looking statements ultimately prove to be accurate. Our forward-looking statements are not guarantees of future performance, and actual results and future performance may differ materially from those suggested in any forward-looking statements. We do not intend to update these statements unless we are required by the securities laws to do so.

### Company Overview

Blue Dolphin Energy Company (www.blue-dolphin-energy.com), a Delaware corporation (referred to herein, with its predecessors and subsidiaries, as “Blue Dolphin,” “BDEC,” “we,” “us” and “our”) was formed in 1986 as a holding company. We conduct substantially all of our operations through our wholly-owned subsidiaries. We are primarily an independent refiner and marketer of petroleum products. Our primary asset is a 56-acre crude oil and condensate processing facility, which is located in Nixon, Wilson County, Texas (the “Nixon Facility”). Operations at the Nixon Facility also involve the storage and terminaling of petroleum under third-party lease agreements. We also own and operate pipeline assets and have leasehold interests in oil and gas properties, which are considered non-core to our business.

### Refinery Operations

Our primary business is the refining of crude oil and condensate into marketable finished and intermediate products at the Nixon Facility, which has a current operating capacity of approximately 15,000 barrels (“bbls”) per day (“bpd”). The Nixon Facility consists of a distillation unit, naphtha stabilizer unit, depropanizer unit, jet fuel treater, approximately 120,000 bbls of crude oil storage capacity, approximately 148,000 bbls of refined product storage capacity and related loading and unloading facilities and utilities.

The Nixon Facility is operated as a “topping unit,” processing light crude oil and condensate primarily from the Eagle Ford Shale formation in South Texas. We purchase the light crude oil and condensate for the Nixon Facility under an exclusive supply agreement with GEL TEX Marketing, LLC (“GEL”), an affiliate of Genesis. The light crude oil and condensate is refined into finished products such as diesel and jet fuel and intermediate products such as naphtha, liquefied petroleum gas (“LPG”) and atmospheric gas oil. Finished products are sold in nearby markets and intermediate products are sold to wholesalers and nearby refineries for further blending and processing. Crude oil and condensate is currently received at the Nixon Facility by truck, however, the facility has the ability to receive feedstock by pipeline. Our refined products are sold and delivered primarily by truck.

### Pipeline Transportation

Our pipeline transportation operations involve the gathering and transportation of oil and natural gas for producers/shippers operating offshore in the vicinity of our pipelines in the U.S. Gulf of Mexico. Producers and shippers are charged a fee based on anticipated throughput volumes. Our pipeline transportation operations represented less than 1% of total revenue for the three months ended March 31, 2014 and 2013.

### Oil and Gas Exploration and Production

Our oil and gas exploration and production assets, which include leasehold interests in properties in the U.S. Gulf of Mexico, were uneconomic for the three months ended March 31, 2014 and 2013 as a result of leases being relinquished and fields being shut-in by operators. Our oil and gas exploration and production operations represented less than 1% of total revenue for the three months ended March 31, 2014 and 2013.

### Owned and Leased Assets

We own, lease, and have leasehold interests in the properties listed below:

| Property | Business Segment(s) | Acres | Owned / Leased | Location |
| --- | --- | ---: | --- | --- |
| Nixon Facility | Refinery Operations | 56 | Owned | Nixon, Wilson County, Texas |
| Freeport Facility | Pipeline Transportation | 193 | Owned | Freeport, Brazoria County, Texas |
| Offshore Pipelines | Pipeline Transportation | -- | Owned | U.S. Gulf of Mexico |
| Oil and Gas Properties | Exploration and Production | -- | Leasehold Interest | U.S. Gulf of Mexico |
| Corporate Headquarters | Corporate and Other | -- | Lease | Houston, Harris County, Texas |

LEH manages and operates all of our properties and is reimbursed for their management and operation under the Management Agreement. We believe that our properties are generally adequate for our operations and are maintained in a good state of repair in the ordinary course of business.

### Options to Purchase Assets

*LTRI Option –* In June 2012, we purchased an exclusive option from LEH to acquire all of the issued and outstanding membership interests of Lazarus Texas Refinery I, LLC (“LTRI”), a Delaware limited liability company and a wholly-owned subsidiary of LEH. LTRI’s assets include a refinery, located on a 104 acre site in Ingleside, San Patricio County, Texas (the “Ingleside Refinery”). The Ingleside Refinery consists of crude oil and condensate processing equipment, pipeline connections, trucking terminals and related storage, storage tanks, a barge dock and receiving facility, pipelines, equipment, related loading and unloading facilities and utilities. The LTRI Option expired on December 31, 2013, and the deposit we paid was applied to the outstanding balance of accounts payable, related party. The parties have endeavored to negotiate a transaction that is fair and in the best interest of our stockholders. However, there can be no assurance that the parties will reach agreeable terms or finalize a transaction for the acquisition of LTRI.

- *LED Option –* In connection with the LE Acquisition, we purchased an exclusive option from LEH to acquire all of the issued and outstanding membership interests of Lazarus Energy Development, LLC (“LED”), a Delaware limited liability company and a wholly-owned subsidiary of LEH. LED owns approximately 46 acres of real property, which is located adjacent to the Nixon Facility in Nixon, Wilson County, Texas. The LED Option expired on December 31, 2013, and the deposit we paid was applied to the outstanding balance of accounts payable, related party. The parties have endeavored to negotiate a transaction that is fair and in the best interest of our stockholders. However, there can be no assurance that the parties will reach agreeable terms or finalize a transaction for the acquisition of LED.

Remainder of Page Intentionally Left Blank

### Key Operating Statistics

Key operational statistics for our core business segment, refinery operations, were as follows:

| Nixon Facility | Three Months Ended March 31, 2014 | 2013 |
| --- | ---: | ---: |
| Operating days | 90 | 85 |
| Total refinery throughput(1) |  |  |
| bbls | 1,092,007 | 978,805 |
| bpd | 12,133 | 11,515 |
| Capacity utilization rate | 81% | 77% |
| Total refinery production |  |  |
| bbls | 1,073,638 | 958,306 |
| bpd | 11,929 | 11,274 |
| Capacity utilization rate | 80% | 75% |

(1) Total refinery throughput includes crude oil and condensate and other feedstocks.

### Major Influences on Results of Operations

The safe, efficient and reliable operation of the Nixon Facility is critical to our financial performance. Any adverse financial impact of a maintenance turnaround or significant capital improvement project is mitigated through a diligent planning process that considers expectations for product availability, seasonality, margin environment and the availability of resources to perform the required work. Periodic maintenance and repairs are generally performed annually, depending on the processing units involved.

Earnings and cash flow from our refining operations are primarily affected by the difference between refined product prices and the prices for crude oil and other feedstocks. The cost to acquire crude oil and other feedstocks and the price of the refined petroleum products we ultimately sell depend on numerous factors beyond our control, including the supply of, and demand for, crude oil, gasoline and other refined petroleum products, which, in turn, depend on, among other factors, changes in domestic and foreign economies, weather conditions, domestic and foreign political affairs, production levels, availability of imports, marketing of competitive fuels and government regulation.

We monitor our per barrel refinery operating margins in order to measure our operating performance. We calculate the per barrel operating margin for the Nixon Facility by dividing the refinery’s gross margin by its throughput volumes. Gross margin is the difference between net sales and cost of sales (excluding any substantial unrealized hedge positions and certain inventory adjustments).

The Nixon Facility is capable of processing substantial volumes of low-sulfur crude oil (sweet crude) and condensate to produce a high percentage of light, higher valued refined petroleum products. Sweet crude and condensate derived from surrounding Eagle Ford Shale production currently comprises 100% of the Nixon Facility’s input.

The nature of our business requires us to maintain access to substantial quantities of crude oil and refined product inventories. Crude oil and refined petroleum products are essentially commodities, and we have no control over the changing market value of these inventories. We utilize an inventory risk management policy in which derivative instruments may be used as economic hedges to reduce our crude oil and refined petroleum products inventory commodity price risk.

### Relationship with Genesis

We continue to be dependent on our relationship with Genesis and its affiliates. Our relationship with Genesis is governed by three agreements:

- the Crude Oil Supply and Throughput Services Agreement by and between GEL and LE dated August 12, 2011 (the “Crude Supply Agreement”);
- the Construction and Funding Contract by and between LE and Milam, an affiliate of Genesis, dated August 12, 2011 (the “Construction and Funding Agreement”); and
- the Joint Marketing Agreement by and between GEL and LE dated August 12, 2011 (as subsequently amended, the “Joint Marketing Agreement”).

Below is a discussion of the material terms and conditions of each of our agreements with Genesis.

- Crude Supply Agreement. Pursuant to the Crude Supply Agreement, GEL, an affiliate of Genesis, is the exclusive supplier of crude oil to the Nixon Facility. We are not permitted to buy crude oil from any other source without GEL’s express written consent. GEL supplies crude oil to LE at cost plus freight expense and any costs associated with GEL’s hedging. All crude oil supplied to LE pursuant to the Crude Supply Agreement is paid for pursuant to the terms of the Joint Marketing Agreement as described below. In addition, GEL has a first right of refusal to use three storage tanks at the Nixon Facility during the term of the Crude Supply Agreement. Subject to certain termination rights, the Crude Supply Agreement has an initial term of three years, expiring on August 12, 2014. In accordance with the terms of the October 2013 Letter Agreement, LE agreed not to terminate the Crude Supply Agreement and GEL agreed to automatically renew the Crude Supply Agreement at the end of the initial term for successive one year periods until August 12, 2019 unless sooner terminated by GEL with 180 days prior written notice.
- Construction and Funding Agreement. Pursuant to the Construction and Funding Agreement, LE engaged Milam to provide construction services on a turnkey basis in connection with the construction, installation and refurbishment of certain equipment at the Nixon Facility (the “Project”). Milam has continued to make advances in excess of their obligation, for certain construction and operating costs at the Nixon Facility. All amounts advanced to LE pursuant to the terms of the Construction and Funding Agreement bear interest at a rate of 6% per annum. In March 2012 (the month after initial operation of the Nixon Facility occurred), LE began paying Milam, in accordance with the provisions of the Joint Marketing Agreement, a minimum monthly payment of $150,000 (the “Base Construction Payment”) as repayment of interest and amounts advanced to LE under the Construction and Funding Agreement. If, however, the Gross Profits of LE (as defined below) in any given month (calculated as the revenue from the sale of products from the Nixon Facility minus the cost of crude oil) are insufficient to make this payment, then there is a deficit amount, which shall accrue interest (the “Deficit Amount”). If there is a Deficit Amount, then 100% of the gross profits in subsequent calendar months will be paid to Milam until the Deficit Amount has been satisfied in full and all previous $150,000 monthly payments have been made. The Construction and Funding Agreement places restrictions on LE, which prohibit LE from: (i) incurring any debt (except debt that is subordinated to amounts owed to Milam or GEL); (ii) selling, discounting or factoring its accounts receivable or its negotiable instruments outside the ordinary course of business while no default exists; (iii) suffering any change of control or merging with or into another entity; and (iv) certain other conditions listed therein. As of the date hereof, Milam can terminate the Construction and Funding Agreement by written notice at any time. If Milam terminates the Construction and Funding Agreement, then Milam and LE are required to execute a forbearance agreement, the form of which has previously been agreed to as Exhibit J of the Construction and Funding Agreement. In accordance with the terms of the October 2013 Letter Agreement, GEL agreed to advance to LE monies not to exceed approximately $186,934 to pay for certain equipment and services at the Nixon Facility. All amounts advanced or paid by GEL or its affiliates pursuant to the October 2013 Letter Agreement will constitute Obligations, as defined in the Construction and Funding Agreement, by LE to Milam under the Construction and Funding Agreement.
- Joint Marketing Agreement. The Joint Marketing Agreement sets forth the terms of the agreement between LE and GEL pursuant to which the parties will market and sell the output produced at the Nixon Facility and share the Gross Profits (as defined below) from such sales. Pursuant to the Joint Marketing Agreement, GEL is responsible for all product transportation scheduling. LE is responsible for entering into contracts with customers for the purchase and sale of output produced at the Nixon Facility and handling all billing and invoicing relating to the same. However, all payments for the sale of output produced at the Nixon Facility will be made directly to GEL as collection agent and all customers must satisfy GEL’s customer credit approval process. Subject to certain amendments and clarifications (as described below), the Joint Marketing Agreement also provides for the sharing of “Gross Profits” (defined as the total revenue from the sale of output from the Nixon Facility minus the cost of crude oil pursuant to the Crude Supply Agreement) as follows:

(a) First, prior to the date on which Milam has recouped all amounts advanced to LE under the Construction and Funding Agreement (the “Investment Threshold Date”), the Base Construction Payment of $150,000 shall be paid to GEL (for remittance to Milam) each calendar month to satisfy amounts owed under the Construction and Funding Agreement, with a catch-up in subsequent months if there is a Deficit Amount until such Deficit Amount has been satisfied in full.

(b) Second, prior to and as of the Investment Threshold Date, LE is entitled to receive weekly payments to cover direct expenses in operating the Nixon Facility (the “Operations Payments”) in an amount not to exceed $750,000 per month plus the amount of any Accounting Fees. If Gross Profits are less than $900,000, then LE’s Operations Payments shall be reduced to equal to the difference between the Gross Profits for such monthly period and the proceeds discussed in (a) above; if Gross Profits are negative, then LE does not get an Operations Payment and the negative balance becomes a Deficit Amount which is added to the total due and owing under the Construction Funding Agreement and such Deficit Amount must be satisfied before any allocation of Gross Profit in the future may be made to LE.

(c) Third, prior to the Investment Threshold Date and subject to the payment of the Base Construction Payment by LE and the Operations Payments by GEL, pursuant to (a) and (b) above, an amount shall be paid to GEL from Gross Profits equal to transportation costs, tank storage fees (if applicable), financial statement preparation fees (collectively, the “GEL Expense Items”), after which GEL shall be paid 80% of the remaining Gross Profits (any percentage of Gross Profits distributed to GEL, the “GEL Profit Share”) and LE shall be paid 20% of the remaining Gross Profits (any percentage of Gross Profits distributed to LE, the “LE Profit Share”); provided, however, that in the event that there is a forbearance payment of Gross Profits required by LE under a forbearance agreement with a bank, then 50% of the LE Profit Share shall be directly remitted by GEL to the bank on LE’s behalf until such forbearance amount is paid in full; and provided further that, if there is a Deficit Amount due under the Construction and Funding Agreement and a forbearance payment of Gross Profits that would otherwise be due and payable to the bank for such period, then GEL shall receive 80% of the Gross Profit and 10% shall be payable to the bank and LE shall not receive any of the LE Profit Share until such time as the Deficit Amount is reduced to zero.

(d) Fourth, after the Investment Threshold Date and after the payment to GEL of the GEL Expense Items, 30% of the remaining Gross Profit up to $600,000 (the “Threshold Amount”) shall be paid to GEL as the GEL Profit Share and LE shall be paid 70% of the remaining Gross Profit as the LE Profit Share. Any amount of remaining Gross Profit that exceeds the Threshold Amount for such calendar month shall be paid to GEL and LE in the following manner: (i) GEL shall be paid 20% of the remaining Gross Profits over the Threshold Amount as the GEL Profit Share and (ii) LE shall be paid 80% of the remaining Gross Profits over the Threshold Amount as the LE Profit Share.

(e) After the Investment Threshold Date, if GEL sustains losses, it can recoup those losses by a special allocation of 80% of Gross Profits until such losses are covered in full, after which the prevailing Gross Profits allocation shall be reinstated.

The Joint Marketing Agreement contains negative covenants that restrict LE’s actions under certain circumstances. For example, LE is prohibited from making any modifications to the Nixon Facility or entering into any contracts with third-parties that would materially affect or impair GEL’s or its affiliates’ rights under the agreements set forth above. The Joint Marketing Agreement has an initial term of three years expiring on August 12, 2014. In accordance with the terms of the October 2013 Letter Agreement, LE agreed not to terminate the Joint Marketing Agreement and GEL agreed to automatically renew the Joint Marketing Agreement at the end of the initial term for successive one year periods until August 12, 2019 unless sooner terminated by GEL with 180 days prior written notice.

- Amendments and Clarifications to the Joint Marketing Agreement. The Joint Marketing Agreement was amended and clarified to allow GEL to provide LE with Operations Payments during months in which LE incurred Deficit Amounts.

(a) In July and August 2012, we entered into amendments to the Joint Marketing Agreement whereby GEL and Milam agreed that Deficit Amounts would be added to our obligation amount under the Construction and Funding Agreement. In addition, the parties agreed to amend the priority of payments to reflect that, to the extent that there are available funds in a particular month, AFNB shall be paid one-tenth of such funds, provided that we will not participate in available funds until Deficit Amounts added to the Construction and Funding Agreement are paid in full.

(b) In December 2012, GEL made Operations Payments and other payments to or on behalf of LE in which the aggregate amount exceeded the amount payable to LE in the month of December 2012 under the Joint Marketing Agreement (the “Overpayment Amount”). In December 2012, we entered into an amendment to the Joint Marketing Agreement whereby GEL and Milam agreed that Gross Profits payable to LE would be redirected to GEL as payment for the Overpayment Amount until such Overpayment Amount has been satisfied in full. Such redistributions shall not reduce the distributions of Gross Profit that GEL or Milam are otherwise entitled to under the Joint Marketing Agreement.

(c) In February 2013, Milam paid a vendor $64,358 (the “Settlement Payment”), which represented amounts outstanding by LE for services rendered at the Nixon Facility plus the vendor’s legal fees. In addition, Milam and GEL incurred legal fees and expenses related to settling the matter. In a letter agreement between LE, GEL and Milam dated February 21, 2013, the parties agreed to modify the Joint Marketing Agreement such that, from and after January 1, 2013, the Gross Profit shall be distributed first to GEL, prior to any other distributions or payments to the parties to the Joint Marketing Agreement until GEL has received aggregate distributions as provided in the December 2012 Letter Agreement plus the Settlement Payment and Milam and GEL incurred legal fees and expenses.

(d) In February 2013, GEL agreed to advance to LE the funds necessary to pay for the actual costs incurred for the scheduled maintenance turnaround at the Nixon Facility and capital expenditures relating to an electronic product meter, lab equipment and certain piping in an amount equal to the actual costs of the refinery turnaround and capital expenditures, not to exceed $840,000 in the aggregate. In a letter agreement between LE, GEL and Milam dated February 21, 2013, the parties agreed that all amounts advanced by GEL or its affiliates to LE pursuant to the letter agreement shall constitute obligations under the Construction and Funding Agreement.

As of March 31, 2014, total advances under the Construction and Funding Agreement, including Deficit Amounts, were $579,259. As of March 31, 2014, pursuant to amendments and clarifications to the Joint Marketing Agreement, the net Deficit Amount included in our obligation amount under the Construction and Funding Agreement was $0.

### Results of Operations

Three Months Ended March 31, 2014 (the "Current Period") Compared to Three Months Ended March 31, 2013 (the "Prior Period").

The Nixon Facility, which was refurbished and began operations in February 2012, has been operating for approximately two years. The Nixon Facility operated for a total of 90 days at 81% of operating capacity during the Current Period. The Nixon Facility operated for a total of 85 days at 77% of operating capacity during the Prior Period.

*Summary*. For the Current Period, we reported net income of $6,194,273, or an income of $0.59 per share, compared to a net loss of $763,331, or a loss of $0.07 per share, for the Prior Period. The net income in the Current Period was primarily attributable to improved product mix related to jet fuel production and favorable refining margins. The Nixon Facility operated for 5 more days and had an increase in both total refinery production and total refinery throughput of approximately 12% in the Current Period compared to the Prior Period.

The safe and reliable operation of the Nixon Facility is key to our financial performance and results of operations. Downtime may result in lost margin opportunity, increased maintenance expense, increased inventory, and a reduction in cash available for payment of our obligations. The Nixon Facility experienced no calendar days of downtime in the Current Period compared to 5 calendar days of downtime in the Prior Period for a scheduled maintenance turnaround.

*Total Revenue from Operations*. For the Current Period, we had total revenue from operations of $120,430,182 compared to total revenue from operations of $109,244,655 for the Prior Period. The approximate 10% increase in total revenue from operations was primarily the result of increased total refinery throughput of approximately 12% in the Current Period compared to the Prior Period. Substantially all of our revenue in the Current Period came from refined product sales, which generated revenue of $120,376,151, or more than 99% of total revenue from operations, compared to $109,171,507, or more than 99% of total revenue from operations, in the Prior Period.

*Cost of Refined Products Sold*. Cost of refined petroleum products sold was $110,415,607 for the Current Period compared to $106,322,661 for the Prior Period. The nearly 4% increase in cost of refined products sold was primarily the result of an increase in the volume of refined products sold.

*Refinery Operating Expenses*. We recorded refinery operating expenses of $2,955,019 in the Current Period, all of which were for services provided to us by LEH to manage and operate Blue Dolphin’s assets pursuant to the Management Agreement with LEH. For the Prior Period, we recorded refinery operating expenses of $2,745,209. The more than 7% increase in refinery operating expenses in the Current Period compared to the Prior Period was primarily the result of a 12% increase in total refinery production. See “Part I, Item 1. Financial Statements - Note (9), Accounts Payable, Related Party” and “Note (24) Subsequent Events” of this report for additional disclosures related to the Management Agreement.

*General and Administrative Expenses*. We incurred general and administrative expenses of $369,484 in the Current Period compared to $484,564 in the Prior Period. The nearly 24% decrease in general and administrative expenses in the Current Period compared to the Prior Period was primarily related to lower consulting, legal and audit expenses.

*Depletion, Depreciation and Amortization.* We recorded depletion, depreciation and amortization expenses of $390,605 in the Current Period compared to $328,788 in the Prior Period. The approximate 19% increase in depletion, depreciation and amortization expenses for the Current Period compared to the Prior Period primarily related to depreciable refinery assets placed in service.

*Abandonment Expense*. We recognized no abandonment expense in the Current Period compared to $27,451 in the Prior Period. Abandonment expense in the Prior Period primarily related to plugging and abandonment costs associated with our High Island A-7 oil and gas property. We will record additional plugging and abandonment costs for oil and gas properties as information becomes available from operators to substantiate actual and/or probable costs.

*Other Income*. We recognized $407,516 in net tank rental and easement revenue in the Current Period compared to $278,350 in the Prior Period. The more than 46% increase in net tank rental and easement revenue in the Current Period compared to the Prior Period was primarily a result of fees received from FLNG Land, II, Inc., a Delaware corporation (“FLNG”), pursuant to a Master Easement Agreement whereby BDPL is providing FLNG with free and uninterrupted pedestrian and vehicular ingress and egress to and from State Highway 332, across the certain property of BDPL to certain property of FLNG.

Remainder of Page Intentionally Left Blank

### Earnings Before Interest, Income Taxes and Depreciation (“EBITDA”)

We have two reportable business segments: (i) “Refinery Operations” and (ii) “Pipeline Transportation.” Business activities related to our “Refinery Operations” business segment are conducted at the Nixon Facility. Business activities related to our “Pipeline Transportation” business segment are primarily conducted in the U.S. Gulf of Mexico through our Pipeline Assets and leasehold interests in oil and gas properties. We have reclassified certain prior year amounts to conform to our 2014 presentation.

Management uses EBITDA, a non-GAAP financial measure, to assess the operating results and effectiveness of our business segments, which consist of our consolidated businesses and investments. We believe EBITDA is useful to our investors because it allows them to evaluate our operating performance using the same performance measure analyzed internally by management. EBITDA is adjusted for: (i) items that do not impact our income or loss from continuing operations, such as the impact of accounting changes, (ii) income taxes and (iii) interest income (expense), depreciation and amortization. We exclude interest expense (or income) and other expenses or income not pertaining to the operations of our segments from this measure so that investors may evaluate our current operating results without regard to our financing methods or capital structure. We understand that EBITDA may not be comparable to measurements used by other companies. Additionally, EBITDA should be considered in conjunction with net income (loss) and other performance measures such as operating cash flows.

Following is a reconciliation of EBITDA by business segment for the three months ended March 31, 2014 (and at March 31, 2014) and the three months ended March 31, 2013 (and at March 31, 2013):

|  | Three Months Ended March 31, 2014 Segment Refinery Operations | Pipeline Transportation | Corporate and Other | Total |
| --- | ---: | ---: | ---: | ---: |
| Revenue | $120,376,151 | $54,031 | $- | $120,430,182 |
| Operation cost(1)(2)(3) | (113,368,578) | (122,510) | (334,729) | (113,825,817) |
| Other non-interest income | 282,516 | 152,697 | - | 435,213 |
| EBITDA | $7,290,089 | $84,218 | $(334,729) | $7,039,578 |
| Depletion, depreciation and |  |  |  |  |
| amortization |  |  |  | (390,605) |
| Other expense, net |  |  |  | (252,277) |
| Income before income taxes |  |  |  | $6,396,696 |
| Capital expenditures | $59,178 | $- | $- | $59,178 |
| Identifiable assets(4) | $50,797,212 | $3,201,220 | $813,789 | $54,812,221 |

(1) “Refinery Operations” and “Pipeline Transportation” include an allocation of general and administrative expenses based on respective revenue.

(2) “Refinery Operations” includes the effect of economic hedges on our refined petroleum products and crude oil inventory, which are executed by Genesis. Cost of refined products sold within operation cost includes a realized loss of $54,469 and an unrealized loss of $127,100.

(3) “Corporate and Other” includes general and administrative expenses associated with corporate maintenance costs, such as director fees and legal expense.

(4) Identifiable assets contain related legal obligations of each business segment including cash, accounts receivable and recorded net assets.

35

|  | Three Months Ended March 31, 2013 Segment Refinery Operations | Pipeline Transportation | Corporate and Other | Total |
| --- | ---: | ---: | ---: | ---: |
| Revenue | $109,171,507 | $73,148 | $- | $109,244,655 |
| Operation cost(1)(2)(3) | (109,063,677) | (154,498) | (459,145) | (109,677,320) |
| Other non-interest income | 278,350 | - | - | 278,350 |
| EBITDA | $386,180 | $(81,350) | $(459,145) | $(154,315) |
| Depletion, depreciation and |  |  |  |  |
| amortization |  |  |  | (328,788) |
| Other expense, net |  |  |  | (280,228) |
| Loss before income taxes |  |  |  | $(763,331) |
| Capital expenditures | $530,226 | $- | $- | $530,226 |
| Identifiable assets(4) | $50,131,322 | $1,662,384 | $967,906 | $52,761,612 |

(1) “Refinery Operations” and “Pipeline Transportation” include an allocation of general and administrative expenses based on respective revenue.

(2) “Refinery Operations” includes the effect of economic hedges on our refined petroleum products and crude oil inventory, which are executed by Genesis. Cost of refined products sold within operation cost includes a realized loss of $36,440 and an unrealized loss of $52,050.

(3) “Corporate and Other” includes general and administrative expenses associated with corporate maintenance costs, such as director fees and legal expense.

(4) Identifiable assets contain related legal obligations of each business segment including cash, accounts receivable and recorded net assets.

Remainder of Page Intentionally Left Blank

### Critical Accounting Policies

Long Lived Assets.

*Refinery and Facilities*. Additions to refinery and facilities are capitalized. Expenditures for repairs and maintenance, including maintenance turnarounds, are expensed as incurred and included in the Management Agreement and covered by LEH (see “Part I, Item 1. Financial Statements – Note (9) Accounts Payable, Related Party” and “Note (24) Subsequent Events” of this report for additional disclosures related to the Management Agreement). Management expects to continue making improvements to the Nixon Facility based on technological advances.

Refinery and facilities are carried at cost. Adjustment of the asset and the related accumulated depreciation accounts are made for refinery and facilities’ retirements and disposals, with the resulting gain or loss included in the statements of operations.

For financial reporting purposes, depreciation of refinery and facilities is computed using the straight-line method using an estimated useful life of 25 years beginning when the refinery and facilities are placed in service.

Management has evaluated the FASB ASC guidance related to asset retirement obligations (“AROs”) for our refinery and facilities. Management has concluded that there is no legal or contractual obligation to dismantle or remove the refinery and facilities. Further, management believes that these assets have indeterminate lives under FASB ASC guidance for estimating AROs because dates or ranges of dates upon which we would retire these assets cannot reasonably be estimated at this time. When a date or range of dates can reasonably be estimated for the retirement of these assets, we will estimate the cost of performing the retirement activities and record a liability for the fair value of that cost using present value techniques. We did not record any impairment of our refinery and facilities for the three months ended March 31, 2014 and 2013.

*Oil and Gas Properties*. We account for our oil and gas properties using the full-cost method of accounting, whereby all costs associated with acquisition, exploration and development of oil and gas properties, including directly related internal costs, are capitalized on a cost center basis. Amortization of such costs and estimated future development costs are determined using the unit-of-production method. Our U.S. Gulf of Mexico oil and gas properties were uneconomical for the three months ended March 31, 2014 and 2013 due to leases expiring and wells being shut-in by operators.

*Pipelines and Facilities Assets*. Pipelines and facilities assets have historically been recorded at cost. We record pipelines and facilities assets at the lower of cost or net realizable value. Depreciation is computed using the straight-line method over estimated useful lives ranging from 10 to 22 years. In accordance with FASB ASC guidance on accounting for the impairment or disposal of long-lived assets, assets are grouped and evaluated for impairment based on the ability to identify separate cash flows generated therefrom.

*Construction in Progress*. Construction in progress expenditures related to refurbishment activities at the Nixon Facility are capitalized as incurred. Depreciation begins once the asset is placed in service.

Other Intangible Assets. We recognized trade name in connection with our reverse merger with LE in 2012. We have determined our trade name to have an indefinite useful life. We account for other intangible assets under FASB ASC guidance related to intangibles, goodwill and other. Under the guidance, intangible assets with indefinite lives are tested annually for impairment. Management performed its regular annual impairment testing of trade name in the fourth quarter of 2013 following FASB ASC guidance for determining impairment. Upon completion of that testing, we determined that no impairment was necessary as of December 31, 2013.

Revenue Recognition. We sell various refined petroleum products including jet fuel, naphtha, distillates and atmospheric gas oil. Revenue from refined product sales is recognized when title passes. Title passage occurs when refined petroleum products are sold or delivered in accordance with the terms of the respective sales agreements. Revenue is recognized when sales prices are fixed or determinable and collectability is reasonably assured.

Customers assume the risk of loss when title is transferred. Transportation, shipping and handling costs incurred are included in cost of refined petroleum products sold. Excise and other taxes that are collected from customers and remitted to governmental authorities are not included in revenue.

Revenue from tank storage rental and land easement agreements are recorded monthly in accordance with the terms of the related lease agreement and included as other income. The lessee is invoiced monthly for the amount of rent due for the related period.

Asset Retirement Obligations. FASB ASC guidance related to AROs requires that a liability for the discounted fair value of an ARO be recorded in the period in which it is incurred and the corresponding cost capitalized by increasing the carrying amount of the related long-lived asset. The liability is accreted towards its future value each period, and the capitalized cost is depreciated over the useful life of the related asset. If the liability is settled for an amount other than the recorded amount, a gain or loss is recognized.

Management has concluded that there is no legal or contractual obligation to dismantle or remove the refinery and facilities. Further, management believes that these assets have indeterminate lives under FASB ASC guidance for estimating AROs because dates or ranges of dates upon which we would retire these assets cannot reasonably be estimated at this time. When a date or range of dates can reasonably be estimated for the retirement of these assets, we will estimate the cost of performing the retirement activities and record a liability for the fair value of that cost using present value techniques.

We recorded an ARO liability related to future asset retirement costs associated with dismantling, relocating or disposing of our offshore platform, pipeline systems and related onshore facilities, as well as plugging and abandonment of wells and land and sea bed restoration costs. We develop these cost estimates for each of our assets based upon regulatory requirements, platform structure, water depth, reservoir characteristics, reservoir depth, equipment market demand, current procedures and construction and engineering consultations. Because these costs typically extend many years into the future, estimating these future costs are difficult and require management to make judgments that are subject to future revisions based upon numerous factors, including changing technology, political and regulatory environments. We review our assumptions and estimates of future abandonment costs on an annual basis.

Income Taxes. We account for income taxes under FASB ASC guidance related to income taxes, which requires recognition of income taxes based on amounts payable with respect to the current year and the effects of deferred taxes for the expected future tax consequences of events that have been included in our financial statements or tax returns. Under this method, deferred tax assets and liabilities are determined based on the differences between the financial accounting and tax basis of assets and liabilities, as well as for operating losses and tax credit carryforwards using enacted tax rates in effect for the year in which the differences are expected to reverse. Valuation allowances are recorded to reduce deferred tax assets when it is more likely than not that a tax benefit will not be realized.

The guidance also prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken in a tax return, as well as guidance on derecognition, classification, interest and penalties, accounting in interim periods, disclosures and transition.

In assessing the realizability of deferred tax assets, management considers whether it is more likely than not that some portion or all of the deferred tax assets will be realized. The ultimate realization of deferred tax assets is dependent upon the generation of future taxable income prior to the expiration of any net operating loss carryforwards.

### Recently Adopted Accounting Guidance

The guidance issued by the FASB during the three months ended March 31, 2014 is not expected to have a material effect on our consolidated financial statements.

Remainder of Page Intentionally Left Blank

### Liquidity and Capital Resources

Sources and Uses of Cash.

| Cash flow from operations | For Three Months Ended March 31, 2014 | 2013 |
| --- | ---: | ---: |
| Adjusted income (loss) from continuing operations | $6,771,230 | $(261,966) |
| Change in assets and current liabilities | (1,571,892) | 515,671 |
| Total cash flow from operations | 5,199,338 | 253,705 |
| Cash inflows (outflows) |  |  |
| Payments on long term debt | (5,267,116) | (60,876) |
| Capital expenditures | (59,178) | (530,226) |
| Proceeds from notes payable | - | 15,032 |
| Payments on note payble | (11,884) | (10,472) |
| Total cash outflows | (5,338,178) | (586,542) |
| Total change in cash flows | $(138,840) | $(332,837) |

At March 31, 2014, our available cash was $295,877. We are currently relying on our profit share, GEL and LEH to fund our working capital requirements. During months in which we receive no profit share distribution, GEL and/or LEH may, but are not required to, fund our operating losses. At March 31, 2014, the Deficit Amount financed by GEL was $0 and the working capital amount funded by LEH was $3,620,647. For months in which GEL finances Deficit Amounts, LE does not receive any of its profit share until the Deficit Amounts have been repaid.

We are dedicated to maintaining safe, efficient and reliable refinery operations, improving liquidity and profitability, and focusing on safety and environmental stewardship. In 2014, we plan to: (i) improve process safety management (“PSM”) standards and develop a PSM program at the Nixon Facility, which is designed to address all aspects of OSHA guidelines for developing and maintaining a comprehensive PSM program, (ii) significantly increase our production of jet fuel, and (iii) continue with refurbishment of key components of the Nixon Facility, including the naphtha stabilizer and depropanizer units, which we anticipate will improve the overall quality of the naphtha that we produce, allow higher recovery of lighter products that can be sold as a liquefied petroleum gas (“LPG”) mix, and increase the amount of throughput that can be processed by the Nixon Facility.

We believe that our operational strategy will be sufficient to support our operations over the next 12 months. However, our efforts depend on several factors, including our future performance, levels of accounts receivable, inventories, accounts payable, capital expenditures, adequate access to credit and financial flexibility to attract long-term capital on satisfactory terms. These factors may be impacted by general economic, political, financial, competitive and other factors beyond our control. There can be no assurance that our operational strategy will achieve the anticipated outcomes, or that GEL and/or LEH will continue to fund our working capital requirements during months in which we have operational losses. In the event our operational strategy is not successful, or our working capital requirements are not funded by our profit share, GEL, or LEH, we may experience a significant and material adverse effect on our operations, liquidity, and financial condition. See “Part I, Item 1A. Risk Factors” in our Annual Report for risk factors related to working capital, liquidity and Nixon Facility downtime.

For the Current Period, we experienced positive cash flow from operations of $5,199,338. For the Prior Period, we experienced positive cash flow from operations of $253,705. This represented an increase in cash flow from operations of $4,945,633 for the Current Period compared to the Prior Period, which was primarily due to profitability.

Payments on long-term debt in the Current Period and Prior Period totaled $5,267,116 and $60,876, respectively, which represented an increase in long-term debt payments of $5,206,240 for the comparable periods.

Capital expenditures in the Current Period and Prior Period totaled $59,178 and $530,226, respectively, which primarily related to investments in the Nixon Facility. We expect to fund additional capital expenditures at the Nixon Facility primarily through the Construction and Funding Agreement, cash from operations or other borrowings. The principal balance owed to Milam under the Construction and Funding Agreement was $579,259 and $5,747,330, including Deficit Amounts, at March 31, 2014 and December 31, 2013, respectively.

We continue to work with our vendors to bring our outstanding accounts payable current as expeditiously as possible. In the event that our efforts are not successful, we will experience a significant and material adverse effect on our continuing operations, liquidity and financial condition.

Our U.S. Gulf of Mexico oil and gas properties were uneconomic for the three months ended March 31, 2014 and 2013 as a result of leases expiring and wells being shut-in by operators. We recognized no abandonment expense in the Current Period compared to $27,451 in the Prior Period. Abandonment expense in the Prior Period primarily related to plugging and abandonment costs associated with our High Island A-7 oil and gas property. We will record additional plugging and abandonment costs for oil and gas properties as information becomes available from operators to substantiate actual and/or probable costs.

The principal balance outstanding on the Refinery Note was $8,958,892 and $9,057,937 at March 31, 2014 and December 31, 2013, respectively. On June 1, 2013, AFNB and LE agreed to amend the Refinery Note (the “Note Modification Agreement”). Pursuant to the Note Modification Agreement, the monthly principal and interest payment due under the Refinery Note is $75,310.

The principal balance outstanding on the Notre Dame Debt was $1,300,000 at March 31, 2014 and December 31, 2013. There are no financial covenants associated with this debt.

See “Part I, Item 1. Financial Statements - Note (13) Long-Term Debt” of this report for additional disclosures related to our long-term debt obligations.

## Market risk

As filed, 2,175 characters.

Commodity Price Risk. We are exposed to market price risk related to our refined petroleum products and crude oil inventory. The spread between crude oil and refined product prices is the primary factor affecting our operations, liquidity and financial condition. Our crude acquisition costs and refined petroleum products sales prices depend on numerous factors beyond our control. These factors include the supply of and demand for crude oil, gasoline, and other refined petroleum products. Supply and demand for these products depend, among other things, on changes in domestic and foreign economies; weather conditions; domestic and foreign political affairs; production levels; availability of imports and exports; marketing of competitive fuels; and government regulation.

In May 2012, we implemented an inventory risk management policy under which Genesis may, but is not required to, use derivative instruments as certain refined product inventories exceed maximum thresholds in an effort to reduce our refined petroleum products and crude oil inventory commodity price risk. However, Genesis’ execution of the inventory risk management plan is outside of our control. Accordingly, there could be situations in which Genesis fails to execute on the plan or executes on the plan in a manner that causes significant losses to us, all of which are beyond our control. In the event that our inventory risk management system fails and/or is implemented poorly or not at all, we could experience a material and negative adverse effect on our operations, liquidity and financial condition.

Interest Rate Risk. We are exposed to interest rate volatility with regard to existing variable rate debt tied to movements in the U.S. prime rate. At March 31, 2014, we had $8,958,892 of variable interest debt with a weighted average interest rate of approximately 5.50%. At March 31, 2014, we performed a sensitivity analysis to determine the impact of an increase in interest rates. Based on this sensitivity analysis, we determined that an increase of 1% in our average floating interest rates at March 31, 2014 would increase interest expense by approximately $89,586 per year.

## Controls and procedures

As filed, 2,503 characters.

### Disclosure Controls and Procedures

As of the end of the period covered by this report, we carried out an evaluation under the supervision and with the participation of our management, including our Principal Executive Officer and Principal Financial Officer, of the effectiveness of the design and operation of our disclosure controls and procedures as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934 (the “Exchange Act”). We have inadequate personnel resources to handle complex accounting transactions and ensure complete segregation of duties within the accounting function. Additionally, we lack formally documented accounting policies and procedures. The combination of these control deficiencies resulted in a material weakness in our internal control over financial reporting.

Based on that evaluation, our Chief Executive Officer (principal executive officer) and interim Chief Financial Officer (principal financial officer) concluded that our disclosure controls and procedures were ineffective as of March 31, 2014. Our disclosure controls and procedures, as defined in Exchange Act Rules 13a-15(e) and 15d-15(e), require us to provide reasonable assurance that information required to be disclosed by us in the reports we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission’s rules and forms and information required to be disclosed by us in the reports we file or submit under the Exchange Act is accumulated and communicated to our management, including our Chief Executive Officer and interim Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosures.

The effectiveness of any system of controls and procedures is subject to certain limitations, and, as a result, there can be no assurance that our controls and procedures will detect all errors or fraud. A control system, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system will be attained.

### Changes in Internal Control over Financial Reporting

There have been no changes in our internal control over financial reporting as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act during the three months ended March 31, 2014 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 1,844 characters.

In addition to the other information set forth in this report, careful consideration should be given to the factors discussed under “Part I, Item 1A. Risk Factors” and elsewhere in our Annual Report on Form 10-K for the year ended December 31, 2013 (the “Annual Report”). These risks and uncertainties could materially and adversely affect our business, financial condition and results of operations. Our operations could also be affected by additional factors that are not presently known to us or by factors that we currently consider immaterial to our business. Except for the addition below, there have been no material changes in our assessment of our risk factors from those set forth in our Annual Report.

*We may be required to post additional collateral in order to satisfy the collateral requirements related to the surety bonds that secure our plugging and abandonment obligations for our pipelines.*

We are currently subject to the bonding or security requirements of BOEM for plugging and abandonment obligations for certain of our pipeline segments in federal waters in the U.S. Gulf of Mexico. Failure to post the requisite bonds or otherwise satisfy the BOEM’s security requirements could have an adverse effect on our ability to operate in the U.S. Gulf of Mexico. We engage a number of surety companies to post the requisite bonds. Pursuant to the terms of our agreements with these surety companies, we are required to post collateral or post collateral on demand, the amount of which can be increased at the surety companies’ discretion. If these surety companies increase the amount of required collateral, or the BOEM increases the amount of the required surety bond, our available liquidity could be adversely affected. We cannot assure that we will be able to satisfy any additional collateral or bonding requirements.

Filed May 15, 2014.
Source: SEC EDGAR, the filing index for accession 0001354488-14-002640. Last ingested by Listed: Nov 24, 2026, 17:01 ET. No prices; not investment advice.