# KBR, Inc.: Form 10-Q for the period ended Mar 31, 2019

- Company: [KBR, Inc.](/companies/kbr.md) (CIK 1357615)
- Form: 10-Q
- Filed: 2019-05-03
- Accepted by EDGAR: May 3, 2019, 14:12 ET
- Period: 2019-03-31
- Accession: 0001357615-19-000108
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1357615/000135761519000108/kbr0331201910-q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1357615/000135761519000108/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2019-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2019-01-01 to 2019-03-31 | $1.34bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 3 months, 2019-01-01 to 2019-03-31 | $1.19bn | us-gaap:CostOfGoodsAndServicesSold |
| Gross profit | 3 months, 2019-01-01 to 2019-03-31 | $153.0m | us-gaap:GrossProfit |
| Selling, general and administrative | 3 months, 2019-01-01 to 2019-03-31 | $78.0m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months, 2019-01-01 to 2019-03-31 | $78.0m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2019-01-01 to 2019-03-31 | $25.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2019-01-01 to 2019-03-31 | $16.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2019-01-01 to 2019-03-31 | $40.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2019-01-01 to 2019-03-31 | $0.28 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2019-01-01 to 2019-03-31 | $0.28 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2019-01-01 to 2019-03-31 | 141,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2019-01-01 to 2019-03-31 | $48.0m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2019-01-01 to 2019-03-31 | $2.0m | us-gaap:PaymentsToAcquireProductiveAssets |
| Dividends paid | 3 months, 2019-01-01 to 2019-03-31 | $11.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Share repurchases | 3 months, 2019-01-01 to 2019-03-31 | $3.0m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2019-03-31 | $708.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2019-03-31 | $1.97bn | us-gaap:AssetsCurrent |
| Total assets | at 2019-03-31 | $5.32bn | us-gaap:Assets |
| Current liabilities | at 2019-03-31 | $1.50bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2019-03-31 | $3.52bn | us-gaap:Liabilities |
| Long-term debt | at 2019-03-31 | $1.22bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2019-03-31 | $27.0m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2019-03-31 | $1.77bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 45,050 characters.

### Introduction

The purpose of MD&A is to disclose material changes in our financial condition since the most recent fiscal year-end and results of operations during the current fiscal period as compared to the corresponding period of the preceding fiscal year. The MD&A should be read in conjunction with the condensed consolidated financial statements, accompanying notes, and our 2018 Annual Report on Form 10-K.

### Overview

Our business is organized into three core and two non-core business segments supporting the government services and hydrocarbons markets as follows:

#### Core business segments

- Government Solutions
- Technology Solutions
- Energy Solutions

#### Non-core business segments

- Non-strategic Business
- Other

See additional information on our business segments, including detail with respect to changes to our reportable segments that became effective this quarter, in Notes 1 and 2 to our condensed consolidated financial statements.

### Business Environment and Trends

Our business portfolio includes full life-cycle professional services, project solutions and technologies delivered across two primary verticals, government and hydrocarbons, aligned with the following:

- Early Project Advisory
- Project Definition
- Project Delivery
- Operations & Maintenance

Our core business capabilities and offerings include research and development, feasibility and solutions development, specialized technical consulting, systems integration, engineering and design service, highly specialized mission and logistics support solutions, process technologies and solutions, program management, construction, commissioning and startup services, and asset operations and maintenance services. We strive to deliver high quality solutions and services to support our clients' success today and to help them strengthen their strategic position for the future.

The global outlook for government services is favorable, with increased defense and space spending budgets driven in part by political instability, military conflicts, aging platforms and infrastructure, and the need for technology upgrades. We expect continued opportunities to provide enabling solutions and technologies to high impact, mission critical work. These opportunities continue to drive best value selections and customer confidence in the enterprise that we have built through our strategic acquisitions and organic growth. Internationally, the majority of our government services work is performed through private financed initiatives with the U.K. Ministry of Defence under long-term firm contracts. These contracts are expected to provide stable, predictable earnings and cash flow over the program life, with our largest PFI extending through 2041.

We expect that a majority of the U.S. government business that we seek in the foreseeable future will be awarded through a competitive bidding process that may be impacted by delays, protests and other challenging dynamics. Additionally, our business may be affected by changes in the overall level of government spending and the alignment of our service and product offerings and capabilities with current and future budget priorities.

In the hydrocarbons sector, demand for our technologies, solutions and services is highly correlated to the level of capital and operating expenditures of our customers and prevailing market conditions. Significant volatility in commodity prices in recent years has resulted in many of our hydrocarbons customers taking steps to defer, suspend or terminate capital expenditures, resulting in delayed or reduced volumes of business across the sector. Recently, the combination of a growing global economy, technological development, and abundant sources of competitively priced feedstock are driving an increase in capital investment opportunities being evaluated and funded by our hydrocarbons customers. For example, we continue to see opportunities for midstream LNG expansion and greenfield projects to satisfy future LNG demand driven in large part by China's and Germany's environmental policies promoting a transition from coal to natural gas. Additionally, downstream projects such as petrochemicals, chemicals and fertilizers benefit from low feedstock prices and increasing global development and consumer demand. From conceptual development studies to project delivery and asset management services, we seek to collaborate with our customers to meet the demands of the growing global economy.

Overall, we believe we have a balanced portfolio of global professional services, program delivery and technologies across the government services and hydrocarbons markets. We believe our increased mix of recurring government services and hydrocarbons services offers stability and predictability that enables us to be selective and disciplined to pursue EPC projects across hydrocarbons markets.

### Three months ended March 31, 2019 compared to the three months ended March 31, 2018

### Overview of Financial Results

For the three months ended March 31, 2019, we generated revenues of $1.3 billion and net income attributable to KBR of $40 million, compared to revenues of $1.0 billion and net income attributable to KBR of $138 million for the three months ended March 31, 2018. The increase in revenues were primarily driven by organic growth on existing projects and our acquisition of SGT in second quarter 2018 in our GS business segment, organic growth in our TS business segment and new projects in our ES business segment. Net income for the three months ended March 31, 2018 included the $115 million gain on consolidation of the Aspire subcontracting entities.

Our GS business segment generated revenues of $975 million and gross profits plus equity in earnings of $96 million for the three months ended March 31, 2019, compared to revenues of $677 million and gross profits plus equity in earnings of $75 million for the three months ended March 31, 2018. The improvements were driven by strong organic growth within our logistics and engineering services business areas and $115 million in additional revenues from the acquisition of SGT in second quarter 2018 as discussed in Note 4 to our condensed consolidated financial statements.

Our TS business segment generated revenues of $92 million and gross profits of $27 million for the three months ended March 31, 2019, compared to revenues of $62 million and gross profits of $21 million for the three months ended March 31, 2018. The increase in revenue was primarily attributable to increased activity in proprietary equipment sales. Profit margins were favorably impacted by higher revenue volume and equipment mix in the three months ended March 31, 2019, resulting in higher gross profits compared to the three months ended March 31, 2018.

Our ES business segment generated revenues of $272 million and gross profit plus equity in earnings of $30 million for the three months ended March 31, 2019, compared to revenues of $299 million and gross profits plus equity in earnings of $44 million for the three months ended March 31, 2018. The decrease in revenue was primarily caused by projects that were completed or substantially completed during the last 12 months, and decreases in revenue and equity earnings also decreased as a result of the wind down of our Ichthys LNG project. See Note 9 to our condensed consolidated financial statements for more information on the Ichthys LNG project.

Our Non-strategic Business segment generated revenues of $1 million and no gross profit for the three months ended March 31, 2019, compared to no revenues and $2 million gross loss for the three months ended March 31, 2018. All Non-Strategic Business projects are substantially complete as of March 31, 2019. We continue to finalize project close-out activities and negotiate the settlement of claims and various other matters associated with these projects.

The information below is an analysis of our consolidated results for the three months ended March 31, 2019, compared to the three months ended March 31, 2018. See *Results of Operations by Business Segment* below for additional information describing the performance of each of our reportable segments.

*Dollars in millions*

| Revenues | Three Months Ended March 31, 2019 | 2018 | 2019 vs. 2018 $% |  |
| --- | ---: | ---: | ---: | ---: |
| Revenues | $1,340 | $1,038 | $302 | 29% |

The increase in consolidated revenues was primarily driven by strong organic growth within our GS logistics and engineering services business areas, an additional $115 million of revenues from the acquisition of SGT in second quarter 2018 and an increase in the TS segment. The increase was partially offset by decreased revenue in our ES segment caused by reduced activity, the completion or near completion of several projects in the U.S. and a decrease in revenue from services we provide to the Ichthys LNG project. See Note 9 to our condensed consolidated financial statements for more information on the Ichthys LNG project.

*Dollars in millions*

| Gross Profit | Three Months Ended March 31, 2019 | 2018 | 2019 vs. 2018 $% |  |
| --- | ---: | ---: | ---: | ---: |
| Gross profit | $153 | $115 | $38 | 33% |

The increase in gross profit was primarily caused by strong organic growth in our GS logistics and engineering services business areas, higher revenue volume for the TS segment, and an increase in the ES segment due to a settlement on an ammonia project in the U.S.

*Dollars in millions*

| Equity in Earnings of Unconsolidated Affiliates | Three Months Ended March 31, 2019 | 2018 | 2019 vs. 2018 $% |  |
| --- | ---: | ---: | ---: | ---: |
| Equity in earnings of unconsolidated affiliates | $— | $23 | $(23) | (100)% |

The decrease in equity in earnings of unconsolidated affiliates was primarily due to a decrease in progress on our Ichthys LNG project in our ES business segment. We also recognized an impairment charge associated with an equity method investment in Mexico. See Note 9 to our condensed consolidated financial statements for more information on the Ichthys LNG project.

*Dollars in millions*

| Selling, General and Administrative Expenses | Three Months Ended March 31, 2019 | 2018 | 2019 vs. 2018 $% |  |
| --- | ---: | ---: | ---: | ---: |
| Selling, general and administrative expenses | $(78) | $(69) | $9 | 13% |

The increase in selling, general and administrative expenses was primarily due to $3 million of SG&A expenses related to SGT which was acquired on April 25, 2018, and increased expense due to the organic growth in our GS business segment. These increases were partially offset by a decline in SG&A expenses related to our ES business segment. Selling, general and administrative expenses in the three months ended March 31, 2019 and 2018 included $25 million and $21 million, respectively, related to corporate activities and $53 million and $48 million, respectively, related to the business segments.

*Dollars in millions*

| Acquisition and Integration Related Costs | Three Months Ended March 31, 2019 | 2018 | 2019 vs. 2018 $% |  |
| --- | ---: | ---: | ---: | ---: |
| Acquisition and integration related costs | $(1) | $(3) | $(2) | (67)% |

The acquisition and integration related costs are primarily comprised of direct, incremental costs related to the acquisition of SGT.

*Dollars in millions*

| Gain on Consolidation of Aspire Entities | Three Months Ended March 31, 2019 | 2018 | 2019 vs. 2018 $% |  |
| --- | ---: | ---: | ---: | ---: |
| Gain on consolidation of Aspire entities | $— | $115 | $(115) | (100)% |

The gain on consolidation of Aspire entities was recognized upon the consolidation of the Aspire Defence subcontracting entities for the three months ended March 31, 2018. See Note 4 to our condensed consolidated financial statements for additional information.

*Dollars in millions*

| Interest Expense | Three Months Ended March 31, 2019 | 2018 | 2019 vs. 2018 $% |  |
| --- | ---: | ---: | ---: | ---: |
| Interest expense | $(25) | $(6) | $19 | 317% |

The increase in interest expense was primarily due to increased borrowings as a result of the refinancing transaction and Convertible Notes as discussed in Note 12 to our condensed consolidated financial statements.

*Dollars in millions*

| Other Non-operating Income (Loss) | Three Months Ended March 31, 2019 | 2018 | 2019 vs. 2018 $% |  |
| --- | ---: | ---: | ---: | ---: |
| Other non-operating income (loss) | $5 | $(2) | $7 | 350% |

Other non-operating income (loss) includes interest income, foreign exchange gains and losses and other non-operating income and expense items. The increase in other non-operating income was primarily due to foreign exchange gains.

*Dollars in millions*

| Provision for Income Taxes | Three Months Ended March 31, 2019 | 2018 | 2019 vs. 2018 $% |  |
| --- | ---: | ---: | ---: | ---: |
| Income before provision for income taxes and noncontrolling interests | $58 | $173 | $(115) | (66)% |
| Provision for income taxes | $(16) | $(34) | $(18) | (53)% |

Our provision for income taxes for the three months ended March 31, 2019, reflects a 27% tax rate as compared to a 20% tax rate for the three months ended March 31, 2018. The effective tax rate of 27% for the three months ended March 31, 2019 was primarily impacted by the rate differential on our foreign earnings including equity losses for which no tax benefit is available. The effective tax rate of 20% for the three months ended March 31, 2018 was impacted by a discrete tax expense as a result of obtaining control of the Aspire Defence subcontracting entities that was recorded at a lower rate than our estimated annual tax rate for 2018. See Note 13 to our condensed consolidated financial statements for further discussion on income taxes.

*Dollars in millions*

| Net Income Attributable to Noncontrolling Interests | Three Months Ended March 31, 2019 | 2018 | 2019 vs. 2018 $% |  |
| --- | ---: | ---: | ---: | ---: |
| Net income attributable to noncontrolling interests | $(2) | $(1) | $1 | 100% |

The increase in net income attributable to noncontrolling interests was primarily due to earnings from our GS and TS business segments.

### Results of Operations by Business Segment

We analyze the financial results for each of our five business segments. The business segments presented are consistent with our reportable segments discussed in Note 2 to our condensed consolidated financial statements.

*Dollars in millions*

| Revenues | Three Months Ended March 31, 2019 | 2018 |
| --- | ---: | ---: |
| Government Solutions | $975 | $677 |
| Technology Solutions | 92 | 62 |
| Energy Solutions | 272 | 299 |
| Other | — | — |
| **Subtotal** | 1,339 | 1,038 |
| Non-strategic Business | 1 | — |
| **Total** | $1,340 | $1,038 |
| **Gross profit (loss)** |  |  |
| Government Solutions | $90 | $67 |
| Technology Solutions | 27 | 21 |
| Energy Solutions | 36 | 29 |
| Other | — | — |
| **Subtotal** | 153 | 117 |
| Non-strategic Business | — | (2) |
| **Total** | $153 | $115 |
| **Equity in earnings of unconsolidated affiliates** |  |  |
| Government Solutions | $6 | $8 |
| Technology Solutions | — | — |
| Energy Solutions | (6) | 15 |
| Other | — | — |
| **Subtotal** | — | 23 |
| Non-strategic Business | — | — |
| **Total** | $— | $23 |
| **Total general and administrative expenses** | $(78) | $(69) |
| **Acquisition and integration related costs** | $(1) | $(3) |
| **Gain on disposition of assets** | $4 | $— |
| **Gain on consolidation of Aspire entities** | $— | $115 |
| **Total operating income** | $78 | $181 |

43

### Government Solutions

GS revenues increased by $298 million, or 44%, to $975 million in the three months ended March 31, 2019, compared to $677 million in the three months ended March 31, 2018. This increase was primarily due to an additional $115 million of revenues from the acquisition of SGT in second quarter 2018, increase in volume in Aspire Defence Capital Works, and strong organic growth in our logistics and engineering services business areas. See Note 4 to our condensed consolidated financial statements for more information on the consolidation of the Aspire Defence subcontracting entities and the acquisition of SGT.

GS gross profit increased by $23 million, or 34%, to $90 million in the three months ended March 31, 2019, compared to $67 million in the three months ended March 31, 2018. This increase was primarily due to $9 million of gross profit from the acquisition of SGT, and increases from organic revenue growth in our logistics and engineering services business areas.

GS equity in earnings of unconsolidated affiliates decreased by $2 million, or 25%, to $6 million in the three months ended March 31, 2019, compared to $8 million in the three months ended March 31, 2018. This decrease was primarily due to the consolidation of the Aspire Defence subcontracting entities in January 2018.

### Technology Solutions

TS revenues increased by $30 million, or 48%, to $92 million in the three months ended March 31, 2019, compared to $62 million in the three months ended March 31, 2018, primarily due to timing of proprietary equipment sales.

TS gross profit increased by $6 million, or 29%, to $27 million in the three months ended March 31, 2019, compared to $21 million in the three months ended March 31, 2018, primarily driven by the increased revenue volume from proprietary equipment sales at lower margins.

### Energy Solutions

ES revenues decreased by $27 million, or 9%, to $272 million in the three months ended March 31, 2019, compared to $299 million in the three months ended March 31, 2018. This decrease was primarily due to reduced activity, projects at or near completion of several projects in the U.S. and decrease in revenue from services we provide to the Ichthys LNG project. See Note 9 to our condensed consolidated financial statements for more information on the Ichthys LNG project.

ES gross profit increased by $7 million, or 24%, to $36 million in the three months ended March 31, 2019, compared to $29 million in the three months ended March 31, 2018. This increase was primarily due to a settlement on an ammonia project in the US.

ES equity in earnings of unconsolidated affiliates decreased by $21 million, or 140%, to a loss of $6 million in the three months ended March 31, 2019, compared to earnings of $15 million in the three months ended March 31, 2018. This decrease was primarily due to a decrease in earnings on the Ichthys LNG project. We also recognized an impairment charge associated with an equity method investment in Latin America. See Note 9 to our condensed consolidated financial statements for more information on the Ichthys LNG project.

### Non-strategic Business

Non-strategic Business earned revenues of $1 million in the three months ended March 31, 2019, compared to $0 million in the three months ended March 31, 2018. Revenues in the Non-strategic Business are primarily associated with close-out activities on completed projects as we exit the business.

Non-strategic Business incurred no profit or loss in the three months ended March 31, 2019, compared to a loss of $2 million in the three months ended March 31, 2018. This change was primarily due to close-out activities on completed projects in the three months ended March 31, 2018 as we exit the business.

### Changes in Estimates

Information relating to our changes in estimates is discussed in Note 2 to our condensed consolidated financial statements. See Note 9 to our condensed consolidated financial statements for more information on the Ichthys JV.

### Backlog of Unfilled Orders

Backlog generally represents the dollar amount of revenues we expect to realize in the future as a result of performing work on contracts and our pro-rata share of work to be performed by unconsolidated joint ventures. We generally include total expected revenues in backlog when a contract is awarded under a legally binding agreement. In many instances, arrangements included in backlog are complex, nonrepetitive and may fluctuate over the contract period due to the release of contracted work in phases by the customer. Additionally, nearly all contracts allow customers to terminate the agreement at any time for convenience. Where contract duration is indefinite and clients can terminate for convenience without compensating us for periods beyond the date of termination, backlog is limited to the estimated amount of expected revenues within the following twelve months. Certain contracts provide maximum dollar limits, with actual authorization to perform work under the contract agreed upon on a periodic basis with the customer. In these arrangements, only the amounts authorized are included in backlog. For projects where we act solely in a project management capacity, we only include the expected value of our services in backlog.

We define backlog, as it relates to U.S. government contracts, as our estimate of the remaining future revenue from existing signed contracts over the remaining base contract performance period (including customer approved option periods) for which work scope and price have been agreed with the customer. We define funded backlog as the portion of backlog for which funding currently is appropriated, less the amount of revenue we have previously recognized. We define unfunded backlog as the total backlog less the funded backlog. Our GS backlog does not include any estimate of future potential delivery orders that might be awarded under our government-wide acquisition contracts, agency-specific indefinite delivery/indefinite quantity contracts, or other multiple-award contract vehicles nor does it include option periods that have not been exercised by the customer.

Within our GS business segment, we calculate estimated backlog for long-term contracts associated with the U.K. government's PFIs based on the aggregate amount that our client would contractually be obligated to pay us over the life of the project. We update our estimates of the future work to be executed under these contracts on a quarterly basis and adjust backlog if necessary.

We have included in the table below our proportionate share of unconsolidated joint ventures' estimated backlog. Since these projects are accounted for under the equity method, only our share of future earnings from these projects will be recorded in our results of operations. Our proportionate share of backlog for projects related to unconsolidated joint ventures totaled $3.1 billion at March 31, 2019, and $3.0 billion at December 31, 2018. We consolidate joint ventures which are majority-owned and controlled or are VIEs in which we are the primary beneficiary. Our backlog included in the table below for projects related to consolidated joint ventures with noncontrolling interests includes 100% of the backlog associated with those joint ventures and totaled $5.3 billion at March 31, 2019, and December 31, 2018.

The following table summarizes our backlog by business segment for the periods ended March 31, 2019, and December 31, 2018, respectively:

*Dollars in millions*

|  | March 31, 2019 | December 31, 2018 |
| --- | ---: | ---: |
| Government Solutions | $10,775 | $11,005 |
| Technology Solutions | 547 | 594 |
| Energy Solutions | 2,278 | 1,896 |
| Subtotal | 13,600 | 13,495 |
| Non-strategic Business | 2 | 2 |
| Total backlog | $13,602 | $13,497 |

We estimate that as of March 31, 2019, 31% of our backlog will be executed within one year. Of this amount, 81% will be recognized in revenues on our condensed consolidated statement of operations and 19% will be recorded by our unconsolidated joint ventures. As of March 31, 2019, $57 million of our backlog relates to active contracts that are in a loss position.

As of March 31, 2019, 9% of our backlog was attributable to fixed-price contracts, 56% was attributable to PFIs and 35% of our backlog was attributable to cost-reimbursable contracts. For contracts that contain both fixed-price and cost-reimbursable components, we classify the individual components as either fixed-price or cost-reimbursable according to the composition of the contract; however, for smaller contracts, we characterize the entire contract based on the predominant component. As of March 31, 2019, $9.6 billion of our GS backlog was currently funded by our customers.

As of March 31, 2019, we had approximately $3.3 billion of priced option periods for U.S. government contracts that are not included in the backlog amounts presented above.

The difference between backlog of $13.6 billion and the remaining performance obligation as defined by ASC 606 of $9.8 billion is primarily due to our proportionate share of backlog related to unconsolidated joint ventures which is not included in our remaining performance obligation. See Note 3 to our condensed consolidated financial statements for discussion of the remaining performance obligation.

### Transactions with Joint Ventures

We perform many of our projects through incorporated and unincorporated joint ventures. In addition to participating as a joint venture partner, we often provide engineering, procurement, construction, operations or maintenance services to the joint venture as a subcontractor. Where we provide services to a joint venture that we control and therefore consolidate for financial reporting purposes, we eliminate intercompany revenues and expenses on such transactions. In situations where we account for our interest in the joint venture under the equity method of accounting, we do not eliminate any portion of our subcontractor revenues or expenses. We recognize the profit on our services provided to joint ventures that we consolidate and joint ventures that we record under the equity method of accounting primarily using the percentage-of-completion method. See Note 10 to our condensed consolidated financial statements in Part I, Item 1 of this Quarterly Report on Form 10-Q for more information. The information discussed therein is incorporated by reference into this Part I, Item 2.

### Legal Proceedings

Information relating to various commitments and contingencies is described in Notes 14 and 15 to our condensed consolidated financial statements in Part I, Item 1 of this Quarterly Report on Form 10-Q, and the information discussed therein is incorporated by reference into this Part I, Item 2.

### Liquidity and Capital Resources

Energy Solutions services projects generally require us to provide credit support for our performance obligations to our customers in the form of letters of credit, surety bonds or guarantees. Our ability to obtain new project awards in the future may be dependent on our ability to maintain or increase our letter of credit and surety bonding capacity, which may be further dependent on the timely release of existing letters of credit and surety bonds. As the need for credit support arises, letters of credit will be issued under our $500 million PLOC or our $500 million Revolver under our Senior Credit Facility. Letters of credit may also be arranged with our banks on a bilateral, syndicated or other basis. We believe we have adequate letter of credit capacity under our Senior Credit Facility and bilateral lines, as well as adequate surety bond capacity under our existing lines to support our operations, backlog for the next 12 months.

Cash generated from operations and the new Senior Credit Facility are our primary sources of liquidity. Our operating cash flow can vary significantly from year to year and is affected by the mix, terms, timing and percentage of completion of our hydrocarbons services projects. Certain projects may receive cash in the early phases of our larger hydrocarbons services fixed-price projects, technology projects, and those of our consolidated joint ventures in advance of incurring related costs. On reimbursable contracts, we may utilize cash on hand or availability under our Senior Credit Facility to satisfy any periodic operating cash requirements for working capital, as we frequently incur costs and subsequently invoice our customers. We believe that existing cash balances, internally generated cash flows and availability under our Senior Credit Facility are sufficient to support our day-to-day domestic and foreign business operations for at least the next 12 months.

Cash and equivalents totaled $708 million at March 31, 2019, and $739 million at December 31, 2018 and consisted of the following:

*Dollars in millions*

|  | March 31, 2019 | December 31, 2018 |
| --- | ---: | ---: |
| Domestic U.S. cash | $152 | $211 |
| International cash | 202 | 210 |
| Joint venture and Aspire project cash | 354 | 318 |
| Total | $708 | $739 |

Our cash balances are held in numerous accounts throughout the world to fund our global activities. Domestic cash relates to cash balances held by U.S. entities and is largely used to support project activities of those businesses as well as general corporate needs such as the payment of dividends to shareholders, repayment of debt and potential repurchases of our outstanding common stock.

Our international cash balances may be available for general corporate purposes but are subject to local restrictions, such as capital adequacy requirements and local obligations, including maintaining sufficient cash balances to support our underfunded U.K. pension plan and other obligations incurred in the normal course of business by those foreign entities. Repatriations of our undistributed foreign earnings are generally free of U.S. tax but may incur withholding and/or state taxes. We still must assess our future U.S. and non-U.S. cash needs such as 1) our anticipated foreign working capital requirements, including funding of our U.K. pension plan, 2) the expected growth opportunities across all geographical markets, and 3) our plans to invest in strategic growth opportunities that may include acquisitions around the world. As of March 31, 2019, we have not changed our indefinite reinvestment decision on our undistributed earnings of our foreign subsidiaries.

Joint venture cash and Aspire Defence project cash balances reflect the amounts held by joint venture entities that we consolidate for financial reporting purposes. These amounts are limited to those entities' activities and are not readily available for general corporate purposes; however, portions of such amounts may become available to us in the future should there be a distribution of dividends to the joint venture partners including us. We expect that the majority of the joint venture cash balances will be utilized for the corresponding joint venture projects.

As of March 31, 2019, substantially all of our excess cash was held in commercial bank time deposits or interest bearing short-term investment accounts with the primary objectives of preserving capital and maintaining liquidity.

### Cash Flows

*Dollars in millions*

| Cash flows activities summary | Three Months Ended March 31, 2019 | 2018 |
| --- | ---: | ---: |
| Cash flows provided by (used in) operating activities | $48 | $(130) |
| Cash flows (used in) provided by investing activities | (69) | 125 |
| Cash flows (used in) provided by financing activities | (17) | 51 |
| Effect of exchange rate changes on cash | 7 | 1 |
| (Decrease) increase in cash and equivalents | $(31) | $47 |

*Operating Activities.* Cash flows from operating activities result primarily from earnings and are affected by changes in operating assets and liabilities which consist primarily of working capital balances for projects. Working capital levels vary from year to year and are primarily affected by the Company's volume of work. These levels are also impacted by the mix, stage of completion and commercial terms of hydrocarbon services projects. Working capital requirements also vary by project depending on the type of client and location throughout the world. Most contracts require payments as the projects progress. Additionally, certain projects receive advance payments from clients. A normal trend for these projects is to have higher cash balances during the initial phases of execution which then decline to equal project earnings at the end of the construction phase. As a result, our cash position is reduced as customer advances are worked off, unless they are replaced by advances on other projects.

The primary components of our working capital accounts are accounts receivable, contract assets, accounts payable and contract liabilities. These components are impacted by the size and changes in the mix of our cost reimbursable versus fixed price projects, and as a result, fluctuations in these components are not uncommon in our business.

Cash provided by operations totaled $48 million in the first three months in 2019 as compared to net income of $42 million. The difference primarily results from net unfavorable changes of $6 million in working capital balances for projects as discussed below:

- The $48 million unfavorable cash flow impact related to accounts receivable was primarily related to increases in accounts receivable in our GS business segment.
- The $39 million favorable cash flow impact related to accounts payable was largely attributable to growth in our TS and GS business segments. This increase was partially offset by decreases in accounts payable related to our ES business segment.
- In addition, we received distributions of earnings from our unconsolidated affiliates of $7 million and contributed $9 million to our pension funds in the first three months of 2019.

Cash used in operations totaled $130 million in the first three months in 2018 primarily resulting from net unfavorable changes of $147 million in working capital balances for projects as discussed below:

- Accounts receivable unfavorable cash flow impact was primarily related to increases in accounts receivable in our GS U.S. operations and increases in accounts receivable in the consolidated Aspire entities, since the date we obtained control, partially offset by strong collections in our TS segment.
- Contract assets unfavorable cash flow impact in the first three months in 2018, primarily due to increases in contract assets related to a downstream EPC project in the U.S. and in various other U.S. government projects.
- Accounts payable favorable cash flow impact in the first three months in 2018, primarily due to the consolidated Aspire entities, since the date we obtained control. This increase was partially offset by decreases in accounts payable related to our ES and TS business segments.
- Contract liabilities unfavorable cash flow impact in the first three months in 2018, primarily due to progress associated with various projects in our GS and ES business segments.
- We received distributions of earnings from our unconsolidated affiliates of $1 million and contributed $10 million to our pension funds in the first three months in 2018.

*Investing Activities.* Cash used in investing activities totaled $69 million in the first three months in 2019 and was primarily due to investment in JKC. See Note 9 to our condensed consolidated financial statements for discussion of the Ichthys Project and our investment contributions to JKC.

Cash provided by investing activities totaled $125 million in the first three months in 2018 and was primarily due to incremental cash resulting from the consolidation of the Aspire entities, offset by an investment in JKC.

*Financing Activities.* Cash used in financing activities totaled $17 million in the first three months of 2019 was primarily due to $11 million for dividend payments to common shareholders.

Cash provided by financing activities totaled $51 million in the first three months of 2018 and includes $70 million in borrowings on our existing Credit Agreement, offset by $11 million for dividend payments to common shareholders and $6 million for the payment of cash associated with the agreement entered into in 2017 to acquire the remaining 25% noncontrolling interest in one of our joint ventures.

*Future sources of cash.* We believe that future sources of cash include cash flows from operations, cash derived from working capital management, and cash borrowings under our Senior Credit Facility.

*Future uses of cash.* We believe that future uses of cash include working capital requirements, funding of recognized project losses, joint venture capital calls, capital expenditures, dividends, pension funding obligations, repayments of borrowings under our Senior Credit Facility, share repurchases and strategic investments including acquisitions. Our capital expenditures will be focused primarily on facilities and equipment to support our businesses. In addition, we will use cash to make payments under operating leases and various other obligations, including potential litigation payments, as they arise.

### Other factors potentially affecting liquidity

*Ichthys LNG Project.* As discussed in Note 9 to our condensed consolidated financial statements, JKC has included in its project estimates-at-completion significant revenues associated with unapproved change orders and claims against the client as well as estimated recoveries of claims against suppliers and subcontractors. The client reserved their contractual rights on certain amounts previously funded to JKC and is currently seeking recoveries of those amounts. JKC continues to incur certain ongoing site services and close-out costs which it believes are reimbursable under the terms of the Ichthys LNG contract for which the client continues to withhold payment. We have funded and expect to continue funding JKC for our proportionate share of the capital requirements in the future until these matters are resolved.

In addition, JKC is incurring substantial costs to complete the power plant under the fixed price portion of the Ichthys LNG contract. JKC believes these costs are recoverable from the Consortium who abandoned their contractual obligation to complete the power plant as the original subcontractor. We have initiated arbitrations and other legal proceedings to recover these costs which may take several years to resolve. As a result, we have funded and expect to continue funding JKC for our proportionate share of the capital requirements to complete the power plant as these legal proceedings progress.

During the three months ended March 31, 2019, we made investment contributions to JKC of approximately $69 million to fund our proportionate share of the ongoing project execution activities. During 2018, we made investment contributions to JKC of approximately $344 million to fund our proportionate share of the ongoing project execution activities. Our projected total investment contributions to complete the project is approximately $500 million, thus leaving approximately $87 million to fund later in 2019. JKC's obligations to the client are guaranteed on a joint and several basis by the joint venture partners. To the extent our joint venture partners are unable to complete their obligations, we may be required to fund incremental amounts above our 30% ownership interest. Negotiations and legal proceedings with the client and the subcontractors are ongoing, the goal of which is to minimize these expected outflows.

As of March 31, 2019, we had $164 million in letters of credit outstanding in support of performance and warranty guarantees provided to the client. The performance letter of credit expires upon provisional acceptance of the facility by the client and the warranty letter of credit expires upon the end of the warranty obligation.

*U.K. pension obligation.* We recognized on our balance sheet a funding deficit of $240 million (measured as the difference between the fair value of plan assets and the projected benefit obligation) for our frozen defined benefit pension plans. The total amounts of employer pension contributions paid for the three months ended March 31, 2019 were $9 million and primarily related to our defined benefit plan in the U.K. The funding requirements for our U.K. pension plan are determined based on the U.K. Pensions Act of 1995. Annual minimum funding requirements are based on a binding agreement with the trustees of the U.K. pension plan that is negotiated on a triennial basis. The binding agreement also includes other assurances and commitments regarding the business and assets that support the U.K. pension plan. We anticipate finalizing a new triennial agreement with the trustees of the U.K. pension in 2019. In the future, such pension funding may increase or decrease depending on changes in the levels of interest rates, pension plan performance and other factors. A significant increase in our funding requirements for the U.K. pension plan could result in a material adverse impact on our financial position.

### Credit Agreement and Senior Credit Facility

Information relating to our Credit Agreement and Senior Credit Facility is described in Note 12 to our condensed consolidated financial statements in Part I, Item 1 of this Quarterly Report on Form 10-Q, and the information discussed therein is incorporated by reference into this Part I, Item 2.

### Convertible Senior Notes

Information relating to our Convertible Senior Notes is described in Note 12 to our condensed consolidated financial statements in Part I, Item 1 of this Quarterly Report on Form 10-Q, and the information discussed therein is incorporated by reference into this Part I, Item 2.

### Nonrecourse Project Debt

Information relating to our nonrecourse project debt is described in Note 12 to our condensed consolidated financial statements in Part I, Item 1 of this Quarterly Report on Form 10-Q, and the information discussed therein is incorporated by reference into this Part I, Item 2.

### Off-Balance Sheet Arrangements

In the ordinary course of business, we enter into various agreements providing performance guarantees to customers on behalf of certain unconsolidated and consolidated joint ventures. These agreements are entered into primarily to support the project execution commitments of these entities. Depending on the specific project joint venture, these performance guarantees have various expiration dates ranging from mechanical completion of the project being constructed to a period extending beyond contract completion in certain circumstances. For cost reimbursable contracts, amounts that may become payable pursuant to guarantee provisions are normally recoverable from the client for work performed under the contract. For lump-sum or fixed-price contracts, the performance guarantee amount is the cost to complete the contracted work, less amounts remaining to be billed to the client under the contract. Remaining billable amounts could be greater or less than the cost to complete. If costs exceed the remaining amounts payable under the contract, the company may have recourse to third parties, such as owners, joint venture partners, subcontractors or vendors for claims. In our joint venture arrangements, typically each joint venture partner indemnifies the other party for any liabilities incurred in excess of the liabilities the other party is obligated to bear under the respective joint venture agreement. See “Item 1A. Risk Factors” contained in Part I of our Annual Report on Form 10-K, which is incorporated herein by reference, for the year ended December 31, 2018, for information regarding our fixed-price contracts and operations through joint ventures and partnerships. Other than discussed in this report, we have not engaged in any material off-balance sheet financing arrangements through special purpose entities, and we have no material guarantees of the work or obligations of third parties.

Financial guarantees, made in the ordinary course of business in certain limited circumstances, are entered into with financial institutions and other credit grantors and generally obligate the company to make payment in the event of a default by the borrower. These arrangements generally require the borrower to pledge collateral to support the fulfillment of the borrower’s obligation.

*Letters of credit, surety bonds and guarantees.* Information relating to our nonrecourse project debt is described in Note 12 to our condensed consolidated financial statements in Part I, Item 1 of this Quarterly Report on Form 10-Q, and the information discussed therein is incorporated by reference into this Part I, Item 2.

### Critical Accounting Policies and Estimates

There have been no material changes to our discussion of critical accounting policies and estimates from those set forth in our 2018 Annual Report on Form 10-K, which is incorporated herein by reference, for the year ended December 31, 2018.

See Note 1, *Description of Company and Significant Accounting Policies,* to our condensed consolidated financial statements for a discussion of the potential impact of new accounting standards on our unaudited condensed consolidated financial statements.

## Market risk

As filed, 4,025 characters.

Cash and equivalents are deposited with major banks throughout the world. We invest excess cash and equivalents in short-term securities, primarily time deposits and money market funds, which carry a fixed rate of return. We have not incurred any credit risk losses related to deposits of our cash and equivalents.

*Foreign Currency Risk*. We are exposed to market risk associated with changes in foreign currency exchange rates primarily related to engineering and construction contracts. We attempt to limit exposure to foreign currency fluctuations in most of these contracts through provisions requiring the client to pay us in currencies corresponding to the currency in which cost is incurred. In addition to this natural hedge, we may use foreign exchange forward contracts and options to hedge material exposures when forecasted foreign currency revenues and costs are not denominated in the same currency and when efficient markets exist. These derivatives are generally designated as cash flow hedges and are carried at fair value. We do not enter into derivative financial instruments for trading purposes or make speculative investments in foreign currencies. We recorded a net gain of $3 million and a net loss of $6 million related to the impact of our hedging activities associated with our operating exposures in "Other non-operating income (expense)" on our condensed consolidated statements of operations for the three months ended March 31, 2019 and 2018, respectively.

We are exposed to and use derivative instruments, such as foreign exchange forward contracts and options to hedge foreign currency risk related to non-functional currency assets and liabilities on our balance sheet. Each period, these balance sheet hedges are marked to market through earnings and the change in their fair value is largely offset by remeasurement of the underlying assets and liabilities. The fair value of these derivatives was not material to our condensed consolidated balance sheet for the three months ended March 31, 2019. See Note 20 to our condensed consolidated financial statements and the information discussed therein is incorporated by reference into this Item 3.

*Interest Rate Risk*. We are exposed to market risk for changes in interest rates for the revolving credit facility and term loan borrowings under our Senior Credit Facility. We had no borrowings outstanding under the revolving credit facility and $984 million under the term loan portions of our Senior Credit Facility as of March 31, 2019. Borrowings under the Senior Credit Facility bear interest at variable rates as described in Note 12 to our condensed consolidated financial statements.

We manage interest rate exposure by entering into interest rate swap agreements where we agree to exchange, at specified intervals, the difference between fixed and variable interest amounts calculated on an agreed-upon notional principal amount. On October 10, 2018, we entered into interest rate swap agreements covering $500 million of notional value of our outstanding term loans. Under these swap agreements, we receive one month LIBOR rate and pay an average monthly fixed rate of 3.055% for the term of the swaps which expire in October 2022. The swap agreements were designated as a cash flow hedge at inception in accordance with ASC Topic 815 Accounting for Derivative and Hedging Transactions. The total fair value of these derivative instruments was a liability of approximately $15 million as of March 31, 2019.

At March 31, 2019, we had fixed rate debt aggregating $850 million and variable rate debt aggregating $484 million, after taking into account the effects of the interest rate swaps. Our weighted average interest rate for the three months ended March 31,

2019, was 5.16%. If interest rates were to increase by 50 basis points, pre-tax interest expense would increase by approximately $2 million in the next twelve months net of the impact from our swap agreements, based on outstanding borrowings as of March 31, 2019.

## Controls and procedures

As filed, 1,771 characters.

In accordance with Exchange Act Rules 13a-15 and 15d-15, we carried out an evaluation, under the supervision and with the participation of management, including our Chief Executive Officer and Chief Financial Officer, of the effectiveness of our disclosure controls and procedures as of the end of the period covered by this report. Based on that evaluation, our Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures were effective as of March 31, 2019, to provide reasonable assurance that information required to be disclosed in our reports filed or submitted under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms. Our disclosure controls and procedures include controls and procedures designed to ensure that information required to be disclosed in reports filed or submitted under the Exchange Act is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

Effective January 1, 2019, we adopted ASC Topic 842 as further discussed in Notes 1 and 16 to our consolidated financial statements. As a result, we implemented changes affecting our internal control over financial reporting in conjunction with the adoption of this standard. We enhanced our contracting and lease evaluation processes, and we implemented process controls to ensure the identification and reporting of lease activities are accurate and complete. Additionally, we implemented a new lease accounting system to manage our lease-related data including process and system controls to support our accounting and disclosure requirements.

## Risk factors

As filed, 207 characters.

There are no material changes from the risk factors previously disclosed in Part I, Item 1A in our Annual Report on Form 10-K, which is incorporated herein by reference, for the year ended December 31, 2018.

Filed May 3, 2019.
Source: SEC EDGAR, the filing index for accession 0001357615-19-000108. Last ingested by Listed: Nov 12, 2026, 17:43 ET. No prices; not investment advice.