# Cheniere Energy Partners, L.P.: Form 10-Q for the period ended Jun 30, 2019

- Company: [Cheniere Energy Partners, L.P.](/companies/cqp.md) (CIK 1383650)
- Form: 10-Q
- Filed: 2019-08-08
- Accepted by EDGAR: Aug 7, 2019, 18:44 ET
- Period: 2019-06-30
- Accession: 0001383650-19-000027
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1383650/000138365019000027/cqp2019form10q2ndqtr.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1383650/000138365019000027/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2019-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2019-04-01 to 2019-06-30 | $1.71bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Revenue | 6 months, 2019-01-01 to 2019-06-30 | $3.45bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 3 months, 2019-04-01 to 2019-06-30 | $880.0m | us-gaap:CostOfGoodsAndServicesSold |
| Cost of revenue | 6 months, 2019-01-01 to 2019-06-30 | $1.76bn | us-gaap:CostOfGoodsAndServicesSold |
| Research and development | 3 months, 2019-04-01 to 2019-06-30 | $0 | us-gaap:ResearchAndDevelopmentExpense |
| Research and development | 6 months, 2019-01-01 to 2019-06-30 | $0 | us-gaap:ResearchAndDevelopmentExpense |
| Operating income | 3 months, 2019-04-01 to 2019-06-30 | $455.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2019-01-01 to 2019-06-30 | $1.02bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2019-04-01 to 2019-06-30 | $230.0m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2019-01-01 to 2019-06-30 | $417.0m | us-gaap:InterestExpense |
| Net income | 3 months, 2019-04-01 to 2019-06-30 | $232.0m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2019-01-01 to 2019-06-30 | $617.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2019-04-01 to 2019-06-30 | $0.44 | us-gaap:EarningsPerShareBasicAndDiluted |
| Diluted EPS | 6 months, 2019-01-01 to 2019-06-30 | $1.19 | us-gaap:EarningsPerShareBasicAndDiluted |
| Operating cash flow | 6 months, 2019-01-01 to 2019-06-30 | $640.0m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months, 2019-01-01 to 2019-06-30 | $585.0m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2019-06-30 | $1.02bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2019-06-30 | $2.44bn | us-gaap:AssetsCurrent |
| Total assets | at 2019-06-30 | $18.97bn | us-gaap:Assets |
| Current liabilities | at 2019-06-30 | $1.33bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2019-06-30 | $16.72bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2019-06-30 | $0 | us-gaap:DebtCurrent |

## Management's discussion and analysis

As filed, 49,180 characters.

### Information Regarding Forward-Looking Statements

This quarterly report contains certain statements that are, or may be deemed to be, “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). All statements, other than statements of historical or present facts or conditions, included herein or incorporated herein by reference are “forward-looking statements.” Included among “forward-looking statements” are, among other things:

- statements regarding our ability to pay distributions to our unitholders;
- statements regarding our expected receipt of cash distributions from SPLNG, SPL or CTPL;
- statements that we expect to commence or complete construction of our proposed LNG terminals, liquefaction facilities, pipeline facilities or other projects, or any expansions or portions thereof, by certain dates, or at all;
- statements regarding future levels of domestic and international natural gas production, supply or consumption or future levels of LNG imports into or exports from North America and other countries worldwide or purchases of natural gas, regardless of the source of such information, or the transportation or other infrastructure or demand for and prices related to natural gas, LNG or other hydrocarbon products;
- statements regarding any financing transactions or arrangements, or our ability to enter into such transactions;
- statements relating to the construction of our Trains, including statements concerning the engagement of any EPC contractor or other contractor and the anticipated terms and provisions of any agreement with any EPC or other contractor, and anticipated costs related thereto;
- statements regarding any SPA or other agreement to be entered into or performed substantially in the future, including any revenues anticipated to be received and the anticipated timing thereof, and statements regarding the amounts of total LNG regasification, natural gas liquefaction or storage capacities that are, or may become, subject to contracts;
- statements regarding counterparties to our commercial contracts, construction contracts, and other contracts;
- statements regarding our planned development and construction of additional Trains, including the financing of such Trains;
- statements that our Trains, when completed, will have certain characteristics, including amounts of liquefaction capacities;
- statements regarding our business strategy, our strengths, our business and operation plans or any other plans, forecasts, projections, or objectives, including anticipated revenues, capital expenditures, maintenance and operating costs and cash flows, any or all of which are subject to change;
- statements regarding legislative, governmental, regulatory, administrative or other public body actions, approvals, requirements, permits, applications, filings, investigations, proceedings or decisions; and
- any other statements that relate to non-historical or future information.

All of these types of statements, other than statements of historical or present facts or conditions, are forward-looking statements. In some cases, forward-looking statements can be identified by terminology such as “may,” “will,” “could,” “should,” “achieve,” “anticipate,” “believe,” “contemplate,” “continue,” “estimate,” “expect,” “intend,” “plan,” “potential,” “predict,” “project,” “pursue,” “target,” the negative of such terms or other comparable terminology. The forward-looking statements contained in this quarterly report are largely based on our expectations, which reflect estimates and assumptions made by our management. These estimates and assumptions reflect our best judgment based on currently known market conditions and other factors. Although we believe that such estimates are reasonable, they are inherently uncertain and involve a number of risks and uncertainties beyond our control. In addition, assumptions may prove to be inaccurate. We caution that the forward-looking statements contained in this quarterly report are not guarantees of future performance and that such statements may not be realized or the forward-looking statements or events may not occur. Actual results may differ materially from those anticipated or implied in forward-looking statements as a result of a variety of factors described in this quarterly report and in the other reports and other information that we file with the SEC, including those discussed under “Risk Factors” in our annual report on Form 10-K for the year ended December 31, 2018. All forward-looking statements attributable to us or persons acting on our behalf are expressly qualified in their entirety by these risk factors. These forward-looking statements speak only as of the date made, and other than as required by law, we undertake no obligation to update or revise any forward-looking statement or provide reasons why actual results may differ, whether as a result of new information, future events or otherwise.

### Introduction

The following discussion and analysis presents management’s view of our business, financial condition and overall performance and should be read in conjunction with our Consolidated Financial Statements and the accompanying notes. This information is intended to provide investors with an understanding of our past performance, current financial condition and outlook for the future. Our discussion and analysis includes the following subjects:

- Overview of Business
- Overview of Significant Events
- Liquidity and Capital Resources
- Results of Operations
- Off-Balance Sheet Arrangements
- Summary of Critical Accounting Estimates
- Recent Accounting Standards

### Overview of Business

We are a publicly traded Delaware limited partnership formed by Cheniere. Our vision is to provide clean, secure and affordable energy to the world, while responsibly delivering a reliable, competitive and integrated source of LNG, in a safe and rewarding work environment. The liquefaction of natural gas into LNG allows it to be shipped economically from the United States where natural gas is abundant and inexpensive to produce to our international customers in areas where natural gas demand and infrastructure exist. Through our wholly owned subsidiary, SPL, we are in various stages of constructing and operating six natural gas liquefaction facilities (the “Liquefaction Project”) at the Sabine Pass LNG terminal located in Cameron Parish, Louisiana, on the Sabine-Neches Waterway less than four miles from the Gulf Coast. Trains 1 through 5 are operational and Train 6 is under construction. Each Train is expected to have a nominal production capacity, which is prior to adjusting for planned maintenance, production reliability, potential overdesign and debottlenecking opportunities, of approximately 4.5 mtpa of LNG per Train. Through our wholly owned subsidiary, SPLNG, we own and operate regasification facilities at the Sabine Pass LNG terminal, which includes pre-existing infrastructure of five LNG storage tanks with aggregate capacity of approximately 16.9 Bcfe, two marine berths that can each accommodate vessels with nominal capacity of up to 266,000 cubic meters and vaporizers with regasification capacity of approximately 4.0 Bcf/d. We also own a 94-mile pipeline that interconnects the Sabine Pass LNG terminal with a number of large interstate pipelines through our wholly owned subsidiary, CTPL.

### Overview of Significant Events

Our significant accomplishments since January 1, 2019 and through the filing date of this Form 10-Q include the following:

#### Strategic

- In May 2019, the board of directors of our general partner made a positive final investment decision with respect to Train 6 of the Liquefaction Project and issued a full notice to proceed with construction to Bechtel Oil, Gas and Chemicals, Inc. (“Bechtel”) in June 2019.

#### Operational

- As of July 31, 2019, approximately 725 cumulative LNG cargoes have been produced, loaded and exported from the Liquefaction Project.
- In March 2019, SPL achieved substantial completion of Train 5 of the Liquefaction Project and commenced operating activities.

#### Financial

- In May 2019, we entered into five-year, $1.5 billion credit facilities (the “2019 CQP Credit Facilities”), which consist of a $750 million delayed draw term loan (“CQP Term Facility”) and a $750 million revolving credit facility (“CQP Revolving Facility”), to fund a portion of the development and construction of Train 6, a third LNG berth and supporting infrastructure at the Liquefaction Project.
- In March 2019, the date of first commercial delivery was reached under the 20-year SPA with BG Gulf Coast LNG, LLC relating to Train 4 of the Liquefaction Project.

### Liquidity and Capital Resources

The following table provides a summary of our liquidity position at June 30, 2019 and December 31, 2018 (in millions):

|  | June 30, 2019 | December 31, 2018 |
| --- | ---: | ---: |
| Cash and cash equivalents | $1,016 | $— |
| Restricted cash designated for the following purposes: |  |  |
| Liquefaction Project | 596 | 756 |
| Cash held by us and our guarantor subsidiaries | — | 785 |
| Available commitments under the following credit facilities: |  |  |
| $1.2 billion SPL Working Capital Facility (“SPL Working Capital Facility”) | 785 | 775 |
| $1.5 billion 2019 CQP Credit Facilities | 851 | — |
| $2.8 billion Credit Facilities (“2016 CQP Credit Facilities”) | — | 115 |

For additional information regarding our debt agreements, see Note 10—Debt of our Notes to Consolidated Financial Statements in this quarterly report and Note 11—Debt of our Notes to Consolidated Financial Statements in our annual report on Form 10-K for the year ended December 31, 2018.

#### CQP Senior Notes

The $1.5 billion of 5.250% Senior Notes due 2025 (the “2025 CQP Senior Notes”) and $1.1 billion of 5.625% Senior Notes due 2026 (the “2026 CQP Senior Notes”) (collectively, the “CQP Senior Notes”) are jointly and severally guaranteed by each of our subsidiaries other than SPL (the “Guarantors”) and, subject to certain conditions governing its guarantee, Sabine Pass LP. The CQP Senior Notes are governed by the same base indenture (the “CQP Base Indenture”). The 2025 CQP Senior Notes are further governed by the First Supplemental Indenture (together with the CQP Base Indenture, the “2025 CQP Notes Indenture”) and the 2026 CQP Senior Notes are further governed by the Second Supplemental Indenture (together with the CQP Base Indenture, the “2026 CQP Notes Indenture”). The 2025 CQP Notes Indenture and the 2026 CQP Notes Indenture contain customary terms and events of default and certain covenants that, among other things, limit our ability and the ability of the Guarantors to incur liens and sell assets, enter into transactions with affiliates, enter into sale-leaseback transactions and consolidate, merge or sell, lease or otherwise dispose of all or substantially all of the applicable entity’s properties or assets.

At any time prior to October 1, 2020 for the 2025 CQP Senior Notes and October 1, 2021 for the 2026 CQP Senior Notes, we may redeem all or a part of the applicable CQP Senior Notes at a redemption price equal to 100% of the aggregate principal amount of the CQP Senior Notes redeemed, plus the “applicable premium” set forth in the respective indentures governing the CQP Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. In addition, at any time prior to October 1, 2020 for the 2025 CQP Senior Notes and October 1, 2021 for the 2026 CQP Senior Notes, we may redeem up to 35% of the aggregate principal amount of the CQP Senior Notes with an amount of cash not greater than the net cash proceeds from certain equity offerings at a redemption price equal to 105.250% of the aggregate principal amount of the 2025 CQP Senior Notes and 105.625% of the aggregate principal amount of the 2026 CQP Senior Notes redeemed, plus accrued and unpaid interest, if any, to the date of redemption. We also may at any time on or after October 1, 2020 through the maturity date of October 1, 2025 for the 2025 CQP Senior Notes and October 1, 2021 through the maturity date of October 1, 2026 for the 2026 CQP Senior Notes, redeem the CQP Senior Notes, in whole or in part, at the redemption prices set forth in the respective indentures governing the CQP Senior Notes.

The CQP Senior Notes are our senior obligations, ranking equally in right of payment with our other existing and future unsubordinated debt and senior to any of our future subordinated debt. After applying the proceeds from the 2026 CQP Senior Notes, the CQP Senior Notes became unsecured. In the event that the aggregate amount of our secured indebtedness and the secured indebtedness of the Guarantors (other than the CQP Senior Notes or any other series of notes issued under the CQP Base Indenture) outstanding at any one time exceeds the greater of (1) $1.5 billion and (2) 10% of net tangible assets, the CQP Senior Notes will be secured to the same extent as such obligations under the 2019 CQP Credit Facilities. The obligations under the 2019 CQP Credit Facilities are secured on a first-priority basis (subject to permitted encumbrances) with liens on substantially all the existing and future tangible and intangible assets and our rights and the rights of the Guarantors and equity interests in the Guarantors (except, in each case, for certain excluded properties set forth in the 2019 CQP Credit Facilities). The liens securing the CQP Senior Notes, if applicable, will be shared equally and ratably (subject to permitted liens) with the holders of other senior secured obligations, which include the 2019 CQP Credit Facilities obligations and any future additional senior secured debt obligations.

#### 2016 CQP Credit Facilities

In May 2019, the remaining commitments under the 2016 CQP Credit Facilities were terminated.

#### 2019 CQP Credit Facilities

In May 2019, we entered into the 2019 CQP Credit Facilities, which consist of a $750 million term loan (“CQP Term Facility”) and a $750 million revolving credit facility (“CQP Revolving Facility”). Borrowings under the 2019 CQP Credit Facilities will be used to fund the development and construction of Train 6 of the Liquefaction Project and subject to a sublimit, for general corporate purposes. The CQP Revolving Facility is also available for the issuance of letters of credit.

Loans under the 2019 CQP Credit Facilities will accrue interest at a variable rate per annum equal to LIBOR or the base rate (equal to the highest of the prime rate, the federal funds effective rate, as published by the Federal Reserve Bank of New York, plus 0.50%, and the adjusted one-month LIBOR plus 1.0%), plus the applicable margin. Under the CQP Term Facility, the applicable margin for LIBOR loans is 1.50% per annum, and the applicable margin for base rate loans is 0.50% per annum, in each case with a 0.25% step-up beginning on May 29, 2022. Under the CQP Revolving Facility, the applicable margin for LIBOR loans is 1.25% to 2.125% per annum, and the applicable margin for base rate loans is 0.25% to 1.125% per annum, in each case depending on our then-current rating. Interest on LIBOR loans is due and payable at the end of each applicable LIBOR period (and at the end of every three-month period within the LIBOR period, if any), and interest on base rate loans is due and payable at the end of each calendar quarter.

We pay a commitment fee equal to an annual rate of 30% of the margin for LIBOR loans multiplied by the average daily amount of the undrawn commitment, payable quarterly in arrears.

The 2019 CQP Credit Facilities mature on May 29, 2024. The principal of any loans under the 2019 CQP Credit Facilities must be repaid in quarterly installments commencing on May 29, 2023 based on an amortization schedule. Any outstanding balance may be repaid, in whole or in part, at any time without premium or penalty, except for interest hedging and interest rate breakage costs. The 2019 CQP Credit Facilities contain conditions precedent for extensions of credit, as well as customary affirmative and negative covenants, and limit our ability to make restricted payments, including distributions, to once per fiscal quarter and one true-up per fiscal quarter as long as certain conditions are satisfied.

The 2019 CQP Credit Facilities are unconditionally guaranteed by each of our subsidiaries other than SPL, Sabine Pass LNG-LP, LLC and certain of our subsidiaries owning other development projects, as well as certain other specified subsidiaries and members of the foregoing entities.

### Sabine Pass LNG Terminal

#### Liquefaction Facilities

We are in various stages of constructing and operating the Liquefaction Project at the Sabine Pass LNG terminal adjacent to the existing regasification facilities. We have received authorization from the FERC to site, construct and operate Trains 1 through 6. We have achieved substantial completion of Trains 1, 2, 3, 4 and 5 of the Liquefaction Project and commenced operating activities in May 2016, September 2016, March 2017, October 2017 and March 2019, respectively. The following table summarizes the status of Train 6 of the Liquefaction Project as of June 30, 2019:

|  | Train 6 |
| --- | ---: |
| Overall project completion percentage | 32.4% |
| Completion percentage of: |  |
| Engineering | 74.1% |
| Procurement | 48.2% |
| Subcontract work | 30.7% |
| Construction | 2.1% |
| Date of expected substantial completion | 1H 2023 |

The following orders have been issued by the DOE authorizing the export of domestically produced LNG by vessel from the Sabine Pass LNG terminal:

- Trains 1 through 4—FTA countries for a 30-year term, which commenced on May 15, 2016, and non-FTA countries for a 20-year term, which commenced on June 3, 2016, in an amount up to a combined total of the equivalent of 16 mtpa (approximately 803 Bcf/yr of natural gas).
- Trains 1 through 4—FTA countries for a 25-year term and non-FTA countries for a 20-year term in an amount up to a combined total of the equivalent of approximately 203 Bcf/yr of natural gas (approximately 4 mtpa).
- Trains 5 and 6—FTA countries and non-FTA countries for a 20-year term, in an amount up to a combined total of 503.3 Bcf/yr of natural gas (approximately 10 mtpa).

In each case, the terms of these authorizations begin on the earlier of the date of first export thereunder or the date specified in the particular order, which ranges from five to 10 years from the date the order was issued. In addition, SPL received an order providing for a three-year makeup period with respect to each of the non-FTA orders for LNG volumes SPL was authorized but unable to export during any portion of the initial 20-year export period of such order.

In January 2018, the DOE issued orders authorizing SPL to export domestically produced LNG by vessel from the Sabine Pass LNG terminal to FTA countries and non-FTA countries over a two-year period commencing January 2018, in an aggregate amount up to the equivalent of 600 Bcf of natural gas (however, exports under this order, when combined with exports under the orders above, may not exceed 1,509 Bcf/yr).

#### Customers

SPL has entered into fixed price SPAs generally with terms of at least 20 years (plus extension rights) with eight third parties for Trains 1 through 6 of the Liquefaction Project, including an agreement anticipated to be assigned from Cheniere Marketing, to make available an aggregate amount of LNG that is between approximately 75% to 85% of the expected aggregate adjusted nominal production capacity from these Trains. Under these SPAs, the customers will purchase LNG from SPL for a price consisting of a fixed fee per MMBtu of LNG (a portion of which is subject to annual adjustment for inflation) plus a variable fee per MMBtu of LNG equal to approximately 115% of Henry Hub. In certain circumstances, the customers may elect to cancel or suspend deliveries of LNG cargoes, in which case the customers would still be required to pay the fixed fee with respect to the contracted volumes that are not delivered as a result of such cancellation or suspension. We refer to the fee component that is applicable regardless of a cancellation or suspension of LNG cargo deliveries under the SPAs as the fixed fee component of the price under SPL’s SPAs. We refer to the fee component that is applicable only in connection with LNG cargo deliveries as the variable fee component of the price under SPL’s SPAs. The variable fees under SPL’s SPAs were sized at the time of entry into each SPA with the intent to cover the costs of gas purchases and transportation related to, and operating and maintenance costs to produce, the LNG to be sold under each such SPA. The SPAs and contracted volumes to be made available under the SPAs are not tied to a specific Train; however, the term of each SPA generally commences upon the date of first commercial delivery of a specified Train.

In aggregate, the annual fixed fee portion to be paid by the third-party SPA customers is approximately $2.3 billion for Trains 1 through 4 and increasing to $2.9 billion upon the date of first commercial delivery of Train 5, with the applicable fixed fees starting from the date of first commercial delivery from the applicable Train, as specified in each SPA.

In addition, Cheniere Marketing has agreements with SPL to purchase up to 20 cargoes totaling approximately 70 million MMBtu scheduled for delivery between May 3 and December 31, 2019 at a price of 115% of Henry Hub plus $2.00 per MMBtu and, at Cheniere Marketing’s option, any LNG produced by SPL in excess of that required for other customers.

#### Natural Gas Transportation, Storage and Supply

To ensure SPL is able to transport adequate natural gas feedstock to the Sabine Pass LNG terminal, it has entered into transportation precedent and other agreements to secure firm pipeline transportation capacity with CTPL and third-party pipeline companies. SPL has entered into firm storage services agreements with third parties to assist in managing variability in natural gas needs for the Liquefaction Project. SPL has also entered into enabling agreements and long-term natural gas supply contracts with third parties in order to secure natural gas feedstock for the Liquefaction Project. As of June 30, 2019, SPL had secured up to approximately 3,437 TBtu of natural gas feedstock through long-term and short-term natural gas supply contracts.

#### Construction

SPL entered into lump sum turnkey contracts with Bechtel for the engineering, procurement and construction of Trains 1 through 6 of the Liquefaction Project, under which Bechtel charges a lump sum for all work performed and generally bears project cost risk unless certain specified events occur, in which case Bechtel may cause SPL to enter into a change order, or SPL agrees with Bechtel to a change order.

The total contract price of the EPC contract for Train 6 of the Liquefaction Project is approximately $2.5 billion, including estimated costs for an optional third marine berth.

#### Regasification Facilities

The Sabine Pass LNG terminal has operational regasification capacity of approximately 4.0 Bcf/d and aggregate LNG storage capacity of approximately 16.9 Bcfe. Approximately 2.0 Bcf/d of the regasification capacity at the Sabine Pass LNG terminal has been reserved under two long-term third-party TUAs, under which SPLNG’s customers are required to pay fixed monthly fees, whether or not they use the LNG terminal. Each of Total Gas & Power North America, Inc. (“Total”) and Chevron U.S.A. Inc. (“Chevron”) has reserved approximately 1.0 Bcf/d of regasification capacity and is obligated to make monthly capacity payments to SPLNG aggregating approximately $125 million annually, prior to inflation adjustments, for 20 years that commenced in 2009. Total S.A. has guaranteed Total’s obligations under its TUA up to $2.5 billion, subject to certain exceptions, and Chevron Corporation has guaranteed Chevron’s obligations under its TUA up to 80% of the fees payable by Chevron.

The remaining approximately 2.0 Bcf/d of capacity has been reserved under a TUA by SPL. SPL is obligated to make monthly capacity payments to SPLNG aggregating approximately $250 million annually, prior to inflation adjustments, continuing until at least May 2036. SPL entered into a partial TUA assignment agreement with Total, whereby upon substantial completion of Train 5 of the Liquefaction Project, SPL gained access to substantially all of Total’s capacity and other services provided under Total’s TUA with SPLNG. This agreement provides SPL with additional berthing and storage capacity at the Sabine Pass LNG terminal that may be used to provide increased flexibility in managing LNG cargo loading and unloading activity, permit SPL to more flexibly manage its LNG storage capacity and accommodate the development of Train 6. Notwithstanding any arrangements between Total and SPL, payments required to be made by Total to SPLNG will continue to be made by Total to SPLNG in accordance with its TUA. During the three months ended June 30, 2019 and 2018, SPL recorded $32 million and $7.5 million, respectively, and during the six months ended June 30, 2019 and 2018, SPL recorded $40 million and $15 million, respectively, as operating and maintenance expense under this partial TUA assignment agreement.

Under each of these TUAs, SPLNG is entitled to retain 2% of the LNG delivered to the Sabine Pass LNG terminal.

#### Capital Resources

We currently expect that SPL’s capital resources requirements with respect to the Liquefaction Project will be financed through project debt and borrowings, cash flows under the SPAs and equity contributions from us. We believe that with the net proceeds of borrowings, available commitments under the SPL Working Capital Facility, 2019 CQP Credit Facilities and cash flows from operations, we will have adequate financial resources available to meet our currently anticipated capital, operating and debt service requirements with respect to Trains 1 through 6 of the Liquefaction Project. SPL began generating cash flows from operations from the Liquefaction Project in May 2016, when Train 1 achieved substantial completion and initiated operating activities. Trains 2, 3, 4 and 5 subsequently achieved substantial completion in September 2016, March 2017, October 2017 and March 2019, respectively. We realized offsets to LNG terminal costs of $48 million in the six months ended June 30, 2019, respectively, that were related to the sale of commissioning cargoes because these amounts were earned or loaded prior to the start of commercial operations of Train 5 of the Liquefaction Project during the testing phase for its construction. We did not realize any offsets to LNG terminal costs in the three months ended June 30, 2019 and the three and six months ended June 30, 2018. Additionally, SPLNG generates cash flows from the TUAs, as discussed above.

The following table provides a summary of our capital resources from borrowings and available commitments for the Sabine Pass LNG Terminal, excluding equity contributions to our subsidiaries and cash flows from operations (as described in *Sources and Uses of Cash*), at June 30, 2019 and December 31, 2018 (in millions):

|  | June 30, 2019 | December 31, 2018 |
| --- | ---: | ---: |
| Senior notes (1) | $16,250 | $16,250 |
| Credit facilities outstanding balance (2) | 649 | — |
| Letters of credit issued (3) | 415 | 425 |
| Available commitments under credit facilities (3) | 1,636 | 775 |
| Total capital resources from borrowings and available commitments | $18,950 | $17,450 |

(1) Includes SPL’s 5.625% Senior Secured Notes due 2021, 6.25% Senior Secured Notes due 2022, 5.625% Senior Secured Notes due 2023, 5.75% Senior Secured Notes due 2024, 5.625% Senior Secured Notes due 2025, 5.875% Senior Secured Notes due 2026 (the “2026 SPL Senior Notes”), 5.00% Senior Secured Notes due 2027 (the “2027 SPL Senior Notes”), 4.200% Senior Secured Notes due 2028 (the “2028 SPL Senior Notes”) and 5.00% Senior Secured Notes due 2037 (the “2037 SPL Senior Notes”) (collectively, the “SPL Senior Notes”) and our 2025 CQP Senior Notes and 2026 CQP Senior Notes.

(2) Includes outstanding balances under the SPL Working Capital Facility and 2019 CQP Credit Facilities, inclusive of any portion of the 2019 CQP Credit Facilities that may be used for general corporate purposes.

(3) Includes SPL Working Capital Facility and 2019 CQP Credit Facilities. Balance at December 31, 2018 did not include the letters of credit issued or available commitments under the terminated 2016 CQP Credit Facilities, which were not specifically for the Sabine Pass LNG Terminal.

For additional information regarding our debt agreements related to the Sabine Pass LNG Terminal, see Note 10—Debt of our Notes to Consolidated Financial Statements in this quarterly report and Note 11—Debt of our Notes to Consolidated Financial Statements in our annual report on Form 10-K for the year ended December 31, 2018.

#### SPL Senior Notes

The SPL Senior Notes are secured on a *pari passu* first-priority basis by a security interest in all of the membership interests in SPL and substantially all of SPL’s assets.

At any time prior to three months before the respective dates of maturity for each series of the SPL Senior Notes (except for the 2026 SPL Senior Notes, 2027 SPL Senior Notes, 2028 SPL Senior Notes and 2037 SPL Senior Notes, in which case the time period is six months before the respective dates of maturity), SPL may redeem all or part of such series of the SPL Senior Notes at a redemption price equal to the “make-whole” price (except for the 2037 SPL Senior Notes, in which case the redemption price is equal to the “optional redemption” price) set forth in the respective indentures governing the SPL Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. SPL may also, at any time within three months of the respective maturity dates for each series of the SPL Senior Notes (except for the 2026 SPL Senior Notes, 2027 SPL Senior Notes, 2028 SPL Senior Notes and 2037 SPL Senior Notes, in which case the time period is within six months of the respective dates of maturity), redeem all or part of such series of the SPL Senior Notes at a redemption price equal to 100% of the principal amount of such series of the SPL Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to the date of redemption.

Both the indenture governing the 2037 SPL Senior Notes (the “2037 SPL Senior Notes Indenture”) and the common indenture governing the remainder of the SPL Senior Notes (the “SPL Indenture”) include restrictive covenants. SPL may incur additional indebtedness in the future, including by issuing additional notes, and such indebtedness could be at higher interest rates and have different maturity dates and more restrictive covenants than the current outstanding indebtedness of SPL, including the SPL Senior Notes and the SPL Working Capital Facility. Under the 2037 SPL Senior Notes Indenture and the SPL Indenture, SPL may not make any distributions until, among other requirements, deposits are made into debt service reserve accounts as required and a debt service coverage ratio test of 1.25:1.00 is satisfied. Semi-annual principal payments for the 2037 SPL Senior Notes are due on March 15 and September 15 of each year beginning September 15, 2025.

#### SPL Working Capital Facility

In September 2015, SPL entered into the SPL Working Capital Facility, which is intended to be used for loans to SPL (“Working Capital Loans”), the issuance of letters of credit on behalf of SPL, as well as for swing line loans to SPL (“Swing Line Loans”), primarily for certain working capital requirements related to developing and placing into operation the Liquefaction Project. SPL may, from time to time, request increases in the commitments under the SPL Working Capital Facility of up to $760 million and, upon the completion of the debt financing of Train 6 of the Liquefaction Project, request an incremental increase in commitments of up to an additional $390 million. As of June 30, 2019 and December 31, 2018, SPL had $785 million and $775 million of available commitments and $415 million and $425 million aggregate amount of issued letters of credit under the SPL Working Capital Facility, respectively. SPL did not have any amounts outstanding under the SPL Working Capital Facility as of both June 30, 2019 and December 31, 2018.

The SPL Working Capital Facility matures on December 31, 2020, and the outstanding balance may be repaid, in whole or in part, at any time without premium or penalty upon three business days’ notice. Loans deemed made in connection with a draw upon a letter of credit have a term of up to one year. Swing Line Loans terminate upon the earliest of (1) the maturity date or earlier termination of the SPL Working Capital Facility, (2) the date 15 days after such Swing Line Loan is made and (3) the first borrowing date for a Working Capital Loan or Swing Line Loan occurring at least three business days following the date the Swing Line Loan is made. SPL is required to reduce the aggregate outstanding principal amount of all Working Capital Loans to zero for a period of five consecutive business days at least once each year.

The SPL Working Capital Facility contains conditions precedent for extensions of credit, as well as customary affirmative and negative covenants. The obligations of SPL under the SPL Working Capital Facility are secured by substantially all of the assets of SPL as well as all of the membership interests in SPL on a *pari passu* basis with the SPL Senior Notes.

### Restrictive Debt Covenants

As of June 30, 2019, we and SPL were in compliance with all covenants related to our respective debt agreements.

### Sources and Uses of Cash

The following table summarizes the sources and uses of our cash, cash equivalents and restricted cash for the six months ended June 30, 2019 and 2018 (in millions). The table presents capital expenditures on a cash basis; therefore, these amounts differ from the amounts of capital expenditures, including accruals, which are referred to elsewhere in this report. Additional discussion of these items follows the table.

|  | Six Months Ended June 30, 2019 | 2018 |
| --- | ---: | ---: |
| Operating cash flows | $640 | $805 |
| Investing cash flows | (586) | (345) |
| Financing cash flows | 17 | (528) |
| Net increase (decrease) in cash, cash equivalents and restricted cash | 71 | (68) |
| Cash, cash equivalents and restricted cash—beginning of period | 1,541 | 1,589 |
| Cash, cash equivalents and restricted cash—end of period | $1,612 | $1,521 |

40

#### Operating Cash Flows

Our operating cash net inflows during the six months ended June 30, 2019 and 2018 were $640 million and $805 million, respectively. The $165 million decrease in operating cash inflows in 2019 compared to 2018 was primarily related to increased operating costs and expenses, partially offset by increased cash receipts from the sale of LNG cargoes, as a result of an additional Train that was operating at the Liquefaction Project in 2019. In addition to Trains 1 through 4 of the Liquefaction Project that were operational during both the six months ended June 30, 2019 and 2018, Train 5 was operational for approximately four months during the six months ended June 30, 2019.

#### Investing Cash Flows

Investing cash net outflows during the six months ended June 30, 2019 and 2018 were $586 million and $345 million, respectively, and were primarily used to fund the construction costs for the Liquefaction Project. These costs are capitalized as construction-in-process until achievement of substantial completion.

#### Financing Cash Flows

Financing cash net inflows of $17 million during the six months ended June 30, 2019 was primarily a result of $649 million of borrowings under the 2019 CQP Credit Facilities partially offset by $616 million of distributions to unitholders. Financing cash net outflows of $528 million during the six months ended June 30, 2018 was primarily a result of $527 million of distributions to unitholders.

### Cash Distributions to Unitholders

Our partnership agreement requires that, within 45 days after the end of each quarter, we distribute all of our available cash (as defined in our partnership agreement). Our available cash is our cash on hand at the end of a quarter less the amount of any reserves established by our general partner. All distributions paid to date have been made from accumulated operating surplus. The following provides a summary of distributions paid by us during the six months ended June 30, 2019 and 2018:

| Date Paid | Period Covered by Distribution | Distribution Per Common Unit | Distribution Per Subordinated Unit | Total Distribution (in millions) Common Units | Subordinated Units | General Partner Units | Incentive Distribution Rights |
| --- | --- | ---: | ---: | ---: | ---: | ---: | ---: |
| May 15, 2019 | January 1 - March 31, 2019 | $0.60 | $0.60 | $209 | $81 | $6 | $13 |
| February 14, 2019 | October 1 - December 31, 2018 | 0.59 | 0.59 | 206 | 80 | 6 | 12 |
| May 15, 2018 | January 1 - March 31, 2018 | 0.55 | 0.55 | 192 | 74 | 5 | 6 |
| February 14, 2018 | October 1 - December 31, 2017 | 0.50 | 0.50 | 174 | 68 | 5 | 1 |

On July 26, 2019, we declared a $0.61 distribution per common unit and subordinated unit and the related distribution to our general partner and incentive distribution right holders to be paid on August 14, 2019 to unitholders of record as of August 6, 2019 for the period from April 1, 2019 to June 30, 2019.

The subordinated units will receive distributions only to the extent we have available cash above the initial quarterly distributions requirement for our common unitholders and general partner along with certain reserves. Such available cash could be generated through new business development or fees received from Cheniere Marketing under an amended and restated variable capacity rights agreement pursuant to which Cheniere Marketing is obligated to pay Cheniere Investments 80% of the expected gross margin of each cargo of LNG that Cheniere Marketing arranges for delivery to the Sabine Pass LNG terminal. The ending of the subordination period and conversion of the subordinated units into common units will depend upon future business development.

### Results of Operations

Our consolidated net income was $232 million, or $0.44 per common unit (basic and diluted), in the three months ended June 30, 2019, compared to $281 million, or $0.55 per common unit (basic and diluted), in the three months ended June 30, 2018.

This $49 million decrease in net income was primarily a result of increased interest expense, net of capitalized interest, due to a decrease in the portion of total interest costs that could be capitalized as Train 5 of the Liquefaction Project completed construction in March 2019.

Our consolidated net income was $617 million, or $1.19 per common unit (basic and diluted), in the six months ended June 30, 2019, compared to $616 million, or $1.22 per common unit (basic and diluted), in the six months ended June 30, 2018. Net income was comparable between the periods primarily due to increased income from operations from an additional Train in operation in the six months ended June 30, 2019, partially offset by increased interest expense, net of capitalized interest, due to a decrease in the portion of total interest costs that could be capitalized for Train 5 of the Liquefaction Project.

We enter into derivative instruments to manage our exposure to changing interest rates and commodity-related marketing and price risk. Derivative instruments are reported at fair value on our Consolidated Financial Statements. In some cases, the underlying transactions economically hedged receive accrual accounting treatment, whereby revenues and expenses are recognized only upon delivery, receipt or realization of the underlying transaction. Because the recognition of derivative instruments at fair value has the effect of recognizing gains or losses relating to future period exposure, use of derivative instruments may increase the volatility of our results of operations based on changes in market pricing, counterparty credit risk and other relevant factors.

#### Revenues

*(in millions, except volumes)*

|  | Three Months Ended June 30, 2019 | 2018 | Change | Six Months Ended June 30, 2019 | 2018 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| LNG revenues | $1,171 | $1,155 | $16 | $2,538 | $2,170 | $368 |
| LNG revenues—affiliate | 455 | 178 | 277 | 760 | 681 | 79 |
| Regasification revenues | 67 | 65 | 2 | 133 | 130 | 3 |
| Other revenues | 12 | 9 | 3 | 23 | 19 | 4 |
| Total revenues | $1,705 | $1,407 | $298 | $3,454 | $3,000 | $454 |
| LNG volumes recognized as revenues (in TBtu) | 305 | 222 | 83 | 568 | 463 | 105 |

We begin recognizing LNG revenues from the Liquefaction Project following the substantial completion and the commencement of operating activities of the respective Trains. In addition to Trains 1 through 4 of the Liquefaction Project that were operational during both the six months ended June 30, 2019 and 2018, Train 5 of the Liquefaction Project was operational for approximately four months during the six months ended June 30, 2019. The increase in revenues for the three and six months ended June 30, 2019 from the comparable periods in 2018 was primarily attributable to the increased volumes of LNG sold following the achievement of substantial completion of Train 5 of the Liquefaction Project, partially offset by decreased revenues per MMBtu. We expect our LNG revenues to increase in the future upon Train 6 of the Liquefaction Project becoming operational.

Prior to substantial completion of a Train, amounts received from the sale of commissioning cargoes from that Train are offset against LNG terminal construction-in-process, because these amounts are earned or loaded during the testing phase for the construction of that Train. We realized offsets to LNG terminal costs of $48 million corresponding to 10 TBtu of LNG in the six months ended June 30, 2019 that related to the sale of commissioning cargoes. We did not realize any offsets to LNG terminal costs in the three months ended June 30, 2019 and the three and six months ended June 30, 2018.

Also included in LNG revenues are gains and losses from derivative instruments, which include the realized value associated with a portion of derivative instruments that settle through physical delivery and the sale of natural gas procured for the liquefaction process. During the three months ended June 30, 2019 and 2018, we realized gains of $34 million and $37 million, respectively, from these transactions and other revenues. During the six months ended June 30, 2019 and 2018, we realized gains of $79 million and $60 million, respectively, from these transactions and other revenues.

#### Operating costs and expenses

*(in millions)*

|  | Three Months Ended June 30, 2019 | 2018 | Change | Six Months Ended June 30, 2019 | 2018 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Cost of sales | $880 | $698 | $182 | $1,759 | $1,535 | $224 |
| Operating and maintenance expense | 162 | 98 | 64 | 300 | 193 | 107 |
| Operating and maintenance expense—affiliate | 37 | 30 | 7 | 66 | 56 | 10 |
| Development expense | — | 1 | (1) | — | 1 | (1) |
| General and administrative expense | 3 | 2 | 1 | 6 | 6 | — |
| General and administrative expense—affiliate | 27 | 17 | 10 | 48 | 35 | 13 |
| Depreciation and amortization expense | 138 | 106 | 32 | 252 | 211 | 41 |
| Impairment expense and loss on disposal of assets | 3 | — | 3 | 5 | — | 5 |
| Total operating costs and expenses | $1,250 | $952 | $298 | $2,436 | $2,037 | $399 |

Our total operating costs and expenses increased during the three and six months ended June 30, 2019 from the three and six months ended June 30, 2018, primarily as a result of an additional Train that was operating between each of the periods and increased third-party service and maintenance costs from additional maintenance and related activities at the Liquefaction Project.

Cost of sales includes costs incurred directly for the production and delivery of LNG from the Liquefaction Project, to the extent those costs are not utilized for the commissioning process. Cost of sales increased during the three and six months ended June 30, 2019 from the three and six months ended June 30, 2018 due to increased volumes of natural gas feedstock for our LNG sales as a result of substantial completion of Train 5 of the Liquefaction Project, partially offset by decreased pricing of natural gas feedstock between the quarterly periods. Partially offsetting the increase in cost of natural gas feedstock was an increase in fair value of the derivatives associated with hedges to secure natural gas feedstock for the Liquefaction Project, due to a favorable shift in the long-term forward prices. Cost of sales also includes variable transportation and storage costs and other costs to convert natural gas into LNG.

Operating and maintenance expense primarily includes costs associated with operating and maintaining the Liquefaction Project. The increase in operating and maintenance expense (including affiliates) during the three and six months ended June 30, 2019 from the three and six months ended June 30, 2018 was primarily related to: (1) increased cost of maintenance and related activities at the Liquefaction Project, (2) increased TUA reservation charges paid to Total from payments under the partial TUA assignment agreement and (3) increased natural gas transportation and storage capacity demand charges paid to third parties from operating Train 5 of the Liquefaction Project following its substantial completion. Operating and maintenance expense (including affiliates) also includes payroll and benefit costs of operations personnel, insurance and regulatory costs and other operating costs.

Depreciation and amortization expense increased during the three and six months ended June 30, 2019 from the three and six months ended June 30, 2018 as a result of Train 5 of the Liquefaction Project becoming operational, as the related assets began depreciating upon reaching substantial completion.

#### Other expense (income)

*(in millions)*

|  | Three Months Ended June 30, 2019 | 2018 | Change | Six Months Ended June 30, 2019 | 2018 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Interest expense, net of capitalized interest | $230 | $184 | $46 | $417 | $369 | $48 |
| Derivative gain, net | — | (3) | 3 | — | (11) | 11 |
| Other income | (7) | (7) | — | (16) | (11) | (5) |
| Total other expense | $223 | $174 | $49 | $401 | $347 | $54 |

Interest expense, net of capitalized interest, increased during the three and six months ended June 30, 2019 compared to the three and six months ended June 30, 2018, primarily as a result of a decrease in the portion of total interest costs that could be capitalized as an additional Train of the Liquefaction Project completed construction between the periods. For the three months ended June 30, 2019 and 2018, we incurred $237 million and $234 million of total interest cost, respectively, of which we capitalized $7 million and $50 million, respectively, primarily for the construction of the Liquefaction Project. For the six months ended June 30, 2019 and 2018, we incurred $472 million and $466 million of total interest cost, respectively, of which we capitalized $55 million and $97 million, respectively, primarily for the construction of the Liquefaction Project.

Derivative gain, net decreased during the three and six months ended June 30, 2019 compared to the three and six months ended June 30, 2018, as we no longer held interest rate swaps used to hedge a portion of the variable interest payments on our credit facilities, as they were terminated in October 2018.

### Off-Balance Sheet Arrangements

As of June 30, 2019, we had no transactions that met the definition of off-balance sheet arrangements that may have a current or future material effect on our consolidated financial position or operating results.

### Summary of Critical Accounting Estimates

The preparation of our Consolidated Financial Statements in conformity with GAAP requires management to make certain estimates and assumptions that affect the amounts reported in the Consolidated Financial Statements and the accompanying notes. There have been no significant changes to our critical accounting estimates from those disclosed in our annual report on Form 10-K for the year ended December 31, 2018.

### Recent Accounting Standards

For descriptions of recently issued accounting standards, see Note 1—Nature of Operations and Basis of Presentation of our Notes to Consolidated Financial Statements.

## Market risk

As filed, 695 characters.

### Marketing and Trading Commodity Price Risk

We have entered into commodity derivatives consisting of natural gas supply contracts for the commissioning and operation of the Liquefaction Project (“Liquefaction Supply Derivatives”). In order to test the sensitivity of the fair value of the Liquefaction Supply Derivatives to changes in underlying commodity prices, management modeled a 10% change in the commodity price for natural gas for each delivery location as follows (in millions):

|  | June 30, 2019 Fair Value | Change in Fair Value | December 31, 2018 Fair Value | Change in Fair Value |
| --- | ---: | ---: | ---: | ---: |
| Liquefaction Supply Derivatives | $34 | $1 | $(43) | $7 |

## Controls and procedures

As filed, 1,045 characters.

We maintain a set of disclosure controls and procedures that are designed to ensure that information required to be disclosed by us in the reports filed by us under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms. As of the end of the period covered by this report, we evaluated, under the supervision and with the participation of our general partner’s management, including our general partner’s Chief Executive Officer and Chief Financial Officer, the effectiveness of our disclosure controls and procedures pursuant to Rule 13a-15 of the Exchange Act. Based on that evaluation, our general partner’s Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures are effective.

During the most recent fiscal quarter, there have been no changes in our internal control over financial reporting that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 139 characters.

There have been no material changes from the risk factors disclosed in our annual report on Form 10-K for the year ended December 31, 2018.

Filed Aug 8, 2019.
Source: SEC EDGAR, the filing index for accession 0001383650-19-000027. Last ingested by Listed: Nov 24, 2026, 17:28 ET. No prices; not investment advice.
