# CPI Aerostructures Inc: Form 10-K/A for the period ended Dec 31, 2020

- Company: [CPI Aerostructures Inc](/companies/cvu.md) (CIK 889348)
- Form: 10-K/A
- Filed: 2021-11-24
- Accepted by EDGAR: Nov 24, 2021, 17:16 ET
- Period: 2020-12-31
- Accession: 0001387131-21-011529
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/889348/000138713121011529/cvu-10ka_123120.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/889348/000138713121011529/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2020-12-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 12 months, 2020-01-01 to 2020-12-31 | $87.6m | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 12 months, 2020-01-01 to 2020-12-31 | $77.8m | us-gaap:CostOfRevenue |
| Gross profit | 12 months, 2020-01-01 to 2020-12-31 | $9.8m | us-gaap:GrossProfit |
| Selling, general and administrative | 12 months, 2020-01-01 to 2020-12-31 | $12.0m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 12 months, 2020-01-01 to 2020-12-31 | −$2.3m | us-gaap:OperatingIncomeLoss |
| Interest expense | 12 months, 2020-01-01 to 2020-12-31 | $1.4m | us-gaap:InterestExpense |
| Income tax | 12 months, 2020-01-01 to 2020-12-31 | −$53.4k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2020-10-01 to 2020-12-31 | $223.4k | us-gaap:NetIncomeLoss |
| Net income | 12 months, 2020-01-01 to 2020-12-31 | −$3.7m | us-gaap:NetIncomeLoss |
| Diluted EPS | 12 months, 2020-01-01 to 2020-12-31 | −$0.31 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 12 months, 2020-01-01 to 2020-12-31 | −$0.31 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 12 months, 2020-01-01 to 2020-12-31 | 11,884,307 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 12 months, 2020-01-01 to 2020-12-31 | −$1.6m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 12 months, 2020-01-01 to 2020-12-31 | $146.8k | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2020-12-31 | $6.0m | us-gaap:Cash |
| Current assets | at 2020-12-31 | $37.7m | us-gaap:AssetsCurrent |
| Total assets | at 2020-12-31 | $46.5m | us-gaap:Assets |
| Current liabilities | at 2020-12-31 | $30.0m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2020-12-31 | $59.5m | us-gaap:Liabilities |
| Long-term debt | at 2020-12-31 | $6.2m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2020-12-31 | $6.5m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2020-12-31 | −$13.0m | us-gaap:StockholdersEquity |

## Business

As filed, 37,562 characters.

### General

CPI Aerostructures, Inc., including its wholly owned subsidiaries (“CPI Aero”, the “Company”, “us” or “we”) is a manufacturer of structural assemblies, integrated systems, and kitted components for the international aerospace and defense (“A&D”) markets. Our products are generally used by customers in the production of fixed wing aircraft, helicopters, electronic warfare (“EW”) systems, intelligence, surveillance, and reconnaissance (“ISR”) systems, missiles, and other sophisticated A&D products. We are primarily a Tier 1 supplier to Original Equipment Manufacturers (“OEMs”). We are also a Tier 2 supplier to larger Tier 1 manufacturers and a prime contractor to the U.S. Department of Defense (“DOD”), primarily the U.S. Air Force (“USAF”). Our products are used by OEMs within both commercial aerospace and national security end markets. In addition to our assembly operations, we provide manufacturing engineering, program management, supply chain management, kitting and maintenance repair and overhaul (“MRO”) services.

Our OEM customers in the defense sector include leading prime defense contractors such as:

- **Lockheed Martin Corporation** - we provide products used in the production of Lockheed Martin Corporation’s (“Lockheed Martin”) F-35 Joint Strike Fighter and an international variant of the F-16 Falcon. We also provide structural assemblies to Sikorsky, a Lockheed Martin company (“Sikorsky”), for many of their military helicopter platforms including the UH-60 BLACK HAWK©, CH-53E, and a special purpose helicopter;
- **Raytheon Technologies Corporation** - we provide products to three business divisions of Raytheon Technologies Corporation (“Raytheon”): Intelligence and Space (the Next Generation Jammer – Mid-Band pod), Missile Systems (wing), and Integrated Defense Systems (Evolved Sea Sparrow missile launcher controller);
- **The Boeing Company** - we provide critical wing structure for The Boeing Company’s (“Boeing”) A-10 re-wing program and welded structure for the CH-47 Chinook; and
- **Northrop Grumman Corporation –** we provide structural components and kits for the Northrop Grumman Corporation (“NGC”) E-2D Advanced Hawkeye, various integrated radar and laser pod structures, and welded fluid tanks for a classified program.

80% and 72% of our revenue in 2020 and 2019, respectively, were generated by subcontracts with defense prime contractors.

We have positioned our Company to take advantage of opportunities in the military aerospace market to a broad customer base, which we believe will reduce the potential impact of industry consolidation. Our success as a subcontractor to defense prime contractors has provided us with opportunities to act as a subcontractor to prime contractors in the production of commercial aircraft structures, which we believe will also reduce our exposure to defense industry consolidation, government spending decisions, and other defense industry risks.

Our OEM customers in the civil aviation market include:

- **Embraer Executive Jets –** we provide engine inlet assemblies for the Phenom 300 business jet; and
- **Gulfstream Aircraft Company–** we provide a critical structure used to produce the wing of Gulfstream Aircraft Company’s flagship G650 large business jet and derivative models such as the G650ER.

10% and 21% of our revenue in 2020 and 2019, respectively, were generated by commercial contract sales.

CPI Aero also is a prime contractor to the DOD, primarily through contracts directly with the USAF and the Defense Logistics Agency (“DLA”). 10% and 7% of our revenue in 2020 and 2019, respectively, were generated by direct government sales.

CPI Aero has over 40 years of experience as a contractor. Our team possesses extensive technical expertise and program management and integration capabilities. Our competitive advantage lies in our ability to offer large contractor capabilities with the flexibility and responsiveness of a small company, while staying competitive in cost and delivering superior quality products.

We maintain a website located at www.cpiaero.com. Our corporate filings, including our Annual Report on Form 10-K and Form 10-K/A, our Quarterly Reports on Form 10-Q and Forms 10-Q/A, our Current Reports on Form 8-K, our proxy statements and reports filed by our officers and directors under Section 16(a) of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), and any amendments to those filings, are available, free of charge, on our website as soon as reasonably practicable after we electronically file such material with the SEC. The contents of our website are not incorporated in or otherwise to be regarded as a part of this Comprehensive Form 10-K/A.

### Significant Contracts

Some of our significant contracts are as follows:

### Military Aircraft – Subcontracts with Prime Contractors

**NGC E-2D “Advanced Hawkeye”:** The NGC E-2 Hawkeye is an all-weather, carrier-based tactical Airborne Early Warning aircraft. The twin turboprop aircraft was designed and developed in the 1950s by the Grumman Aircraft Company for the United States Navy. The United States Navy aircraft has been progressively updated with the latest variant, the E-2D, first flying in 2007. In 2008, we received an initial $7.9 million order from NGC to provide structural kits used in the production of Outer Wing Panels (“OWP”) of the E-2D. We initially valued the long-term agreement at approximately $98 million over an eight-year period, with the potential to be in excess of $195 million over the life of the aircraft program. In February of 2019, we announced a new multi-year award valued at up to approximately $47.5 million. In June 2020, we announced that we had received firm orders valued in excess of $43 million and $5 million in long-lead funding in anticipation of purchase orders for OWP structural components and kits. Since 2008, the cumulative orders we have received on this program through December 31, 2020 exceed $207 million.

In addition, in 2015 we won an award to supply structural components and kits for the Wet Outer Wing Panel (“WOWP”) on the E-2D Advanced Hawkeye airborne early warning and control (“AEW&C”) aircraft that will be manufactured for Japan. We are responsible for component source selection, supply chain management, delivery of kits, and are providing manufacturing engineering services to NGC during the integration of the components into the WOWP. In late 2019, CPI Aero received additional WOWP kit requirements increasing the total expected value of the WOWP program for Japan to be in excess of $37 million.

In February 2020, the Company’s WMI subsidiary received from NGC approximately $4 million in purchase orders to provide numerous welded structure and tubes for the E-2D Advanced Hawkeye. Under the terms of the purchase orders, WMI will manufacture more than 140 different items in support of the production of at least 25 E-2D aircraft. The period of performance is expected to be through 2022.

**ALQ-249 Next Generation Jammer – Mid-Band Pod (NGJ-MB):** The Raytheon NGJ-MB pod is an external jamming pod that will disrupt and degrade enemy aircraft and ground radar and communication systems and will replace the ALQ-99 system on the U.S. Navy's EA-6B Growler carrier-based electronic warfare aircraft. The U.S. Navy plans to install these pods on 138 EA-18G Growlers during the production phase. There are two pods per aircraft. Raytheon received a $1 billion sole source contract from the U.S. Navy in April 2016, and CPI Aero has a contract with Raytheon to assemble the pod structural housing and air management system (“AMS”). In 2019, Raytheon authorized CPI Aero to begin production of pod structures and air management system components for the System Demonstration and Test Article (“SDTA”) phase of the NGJ-MB program. All SDTA pods and AMS components are expected to ship during 2021. CPI Aero estimates the value of the NGJ-MB program through the SDTA phase to be approximately $60 million. On November 16, 2021 the Company announced it was authorized by Raytheon to start the production phase of the program. We believe that the total value of the NGJ-MB program through production will be in excess of $210 million through 2030.

**A-10 Thunderbolt II “Warthog”**: The Boeing A-10 Thunderbolt II, also known as the Warthog, is a twin-engine aircraft that provides close-air support of ground forces and employs a wide variety of conventional munitions including general-purpose bombs. The simple, effective and survivable single-seat aircraft can be used against all ground targets, including tanks and other armored vehicles. On August 21, 2019, Boeing announced an award from the USAF with a maximum contract value of $999 million to manage the production of up to 112 new wing sets and spares kits for A-10 aircraft. The USAF ordered 27 wing sets immediately at contract award. In 2019, CPI Aero announced the receipt of an Indefinite Delivery/Indefinite Quantity (IDIQ) contract with a maximum ceiling value of $48 million from Boeing for structural assemblies for the A-10. Under the terms of the IDIQ contract, CPI Aero will manufacture major structural subassemblies of the A-10 aircraft’s wing. The Company also announced that it has received initial purchase orders under the IDIQ contract valued at approximately $6 million for the production of four shipsets of assemblies and associated program start-up costs. In May 2020, CPI Aero announced the receipt of additional purchase orders totaling approximately $14 million from Boeing.

**F-35 Lightning II:** The Lockheed Martin F-35 Lightning II is a family of single-seat, single-engine, all-weather stealth multirole fighters designed to perform ground attack, aerial reconnaissance, and air defense missions. The DOD plans to acquire over 2,400 F-35's by 2034 and 11 other countries also have plans to acquire the aircraft. The Company has two significant contracts for products used on the F-35. In 2015, CPI Aero was awarded a multi-year contract to supply four different lock assemblies for the arresting gear door on the F-35A CTOL. CPI Aero made its first delivery under that contract in May 2017. In 2018, the Company received a new long-term agreement value at approximately $8 million for lock assemblies to be delivered between 2020 and 2024. In November 2017, CPI Aero was awarded an additional $15.8 million multi-year contract to manufacture canopy activation drive shaft assemblies for the F-35A, F-35B, and F-35C aircraft.

**UH-60 “BLACK HAWK”:** The Sikorsky UH-60 BLACK HAWK helicopter is the leader in multi-mission-type-aircraft. Among the mission configurations its serves are troop transport, medical evacuation, electronic warfare, attack, assault support and special operations. More than 3,000 BLACK HAWK helicopters are in use today, operating in 29 countries. CPI Aero and its WMI subsidiary manufacture several different structural assemblies, including welded structure, for the BLACK HAWK helicopter. The majority of CPI Aero’s contracts for the BLACK HAWK are as a Tier 1 supplier to Sikorsky. The Company also is a Tier 2 supplier to GKN Aerospace for ultimate use on the BLACK HAWK. In 2017, CPI Aero received an approximate $21 million long-term agreement through 2022 for the production of fuel panel assemblies, work it has performed for Sikorsky since 2010. Also in 2017, the Company received an $8 million long-term agreement through 2022 to manufacture machine gunner window assemblies, continuing work it has performed since 2010. More recently, since October 2018, CPI Aero has received multiple purchase orders totaling $22 million for Hover Infrared Suppression System (HIRSS) module assemblies for use as spares on older variants of the UH-60 BLACK HAWK helicopter. The HIRSS is a defensive countermeasures system that is integral to the survival of the UH-60 Black Hawk by reducing the opportunity for an infrared-seeking threat system to acquire, lock onto, track, and destroy the helicopter. In May 2021, the Company announced receiving a multi-year contract valued at up to $17.2 million for the overhaul and repair (O&R) of outboard stabilator assemblies in support of the Sikorsky MH-60 SEAHAWK.

**F-16V Fighting Falcon:** The Lockheed Martin F-16 is the world’s most successful, combat-proven multirole fighter. Approximately 3,000 operational F-16s are in service today in 25 countries. The F-16V is a new variant, sold exclusively to international air forces and is the most technologically advanced, fourth generation fighter in the world. In 2019, the Company announced it had been awarded a multi-year contract by Lockheed Martin to manufacture Rudder Island and Drag Chute Canister (RI/DCC) assemblies for the F-16V. The RI/DCC is a large structural sub-assembly that is installed on the tail section of the aircraft. Deliveries are expected to begin during late 2020 and continue through 2024. In June 2020, the Company announced that it had been awarded a follow-on order from Lockheed Martin to manufacture structural assemblies for new production F-16 Block 70/72 aircraft. The total value of the RI/DCC program is approximately $21 million and we have received more than $8.7 million in orders through December 31, 2020.

**CH-53K King Stallion:** The CH-53K is a heavy-lift helicopter being developed by Sikorsky for the United States Marine Corps. Flight testing began in 2018. We manufacture composite electronics racks as a Tier 2 supplier to Spirit AeroSystems, Inc., the manufacturer of the CH-53K cockpit and cabin. Through December 31, 2020, we have received orders for development and test valued at more than $2.5 million, including a $1.1 million order for rack with delivery requirements commencing in mid-2020 through 2021.

**Undisclosed Vehicle:** In 2018 the Company received an initial purchase order from Raytheon Missile Systems Company, a subsidiary of Raytheon, to manufacture structural assemblies on an undisclosed vehicle. In 2019, CPI Aero completed the initial order and in January 2021, CPI Aero announced a subsequent purchase order to manufacture additional units. The undisclosed vehicle is currently under development. Terms of the order will not be disclosed.

**Undisclosed Pod Structure:** In 2019, the Company received an initial purchase order from Raytheon to manufacture pod structures for an undisclosed application. The value of the order was approximately $2.3 million for manufacturing engineering service, development of assembly tooling and the production of the prototypes. The undisclosed pod structure is currently under development. In October 2021, the Company announced Raytheon awarded an approximate $6 million contract modification that changes the scope of work the Company would perform and increases the quantity of pods to be produced. .

### Military Aircraft – Prime Contracts with U.S. Government

**F-16 “Fighting Falcon”:** Since 2014, we have been a prime contractor to the DLA to provide structural wing components and logistical support for global F-16 aircraft MRO operations. Through December 31, 2020 we have received almost $15 million in orders on this program.

**T-38 Pacer Classic III, Phase 2:** For more than 50 years, the Northrop T-38 has been the principal supersonic jet trainer used by the USAF. The T-38C Pacer Classic III Fuselage Structural Modification Kit Integration program (“PC III”) and the Talon Repair Inspection and Maintenance (“TRIM”) programs are expected to increase the structural service life of the T-38 beyond 2030. In 2015, CPI Aero was awarded Phase 2 of PC III and has received purchase orders valued at approximately $2 million from the USAF to provide structural modification kits for the PC III aircraft structural modification program. Through December 2020, we have received $23.8 million in orders on this program.

**T-38 Pacer Classic III, Phase 3 and TRIM:** In July 2019, the Company announced a new $65.7 million IDIQ contract from the USAF for the final phase of PC III as well as TRIM. The TRIM program is a separate USAF structural modification effort that will extend the structural service life of T-38A and T-38 model types, as well as, T-38C models that were not modified during PC III. Through December 31 2020, the Company has received orders valued at approximately $15.3 million for the PC III, Phase 3 and TRIM programs. In 2021, the Company announced it had received three separate orders for additional requirements valued at $16.2 million, bringing total orders under this long term contract to approximately $31.5 million.

### Commercial Aircraft – Subcontracts with Prime Contractors

**G650/G650ER:** The Gulfstream G650 is a twin-engine business jet airplane produced by Gulfstream Aerospace that can be configured to carry from 11 to 18 passengers. Gulfstream began the G650 program in 2005 and revealed it to the public in 2008. The G650 is Gulfstream’s largest and fastest business jet. The G650ER is an extended range version of the aircraft. In 2020, Gulfstream announced the launch of a new derivative the G700. In March 2008, Spirit AeroSystems, Inc. awarded us a contract to provide fixed leading edges (FLE) for the Gulfstream G650 business jet, and derivative models, a commercial program that Spirit was supporting. In December 2014, Spirit transferred its work-scope on this program to Triumph Group. Due to the impact of the COVID-19 pandemic, in May 2020, Triumph Group cancelled nearly all open orders with the Company. On May 27, 2020, Triumph Group announced it had reached an agreement in principle to sell the G650 wing program to Gulfstream Aerospace, and on June 12, 2020, we received a joint communication from Gulfstream Aerospace and Triumph Group that stated Gulfstream’s intention at the conclusion of the transaction is to continue to purchase G650 wing components from the Company. In December 2020, we received purchase orders directly from Gulfstream for wing components for use on the G650, G650ER and/or G700 aircraft.

**Phenom 300:** The Phenom 300 is a twin-engine, executive jet produced by Brazilian aircraft company Embraer, S.A. that can carry between 6 and 10 passengers and a crew of 2. We have been producing engine inlet assemblies for Embraer under a long-term agreement we entered into in 2012. We have received approximately $36 million in orders on this program through December 31 2020. We estimate the potential value of the program to be in excess of $52 million.

### Sales and Marketing

We are recognized within the aerospace industry as a Tier 1 or Tier 2 supplier to major aircraft suppliers. Additionally, we may bid for military contracts set aside specifically for small businesses.

We are generally awarded initial contracts for our products and services through the process of competitive bidding. This process begins when we first learn, formally or otherwise, of a potential contract from a prospective customer and concludes after all negotiations are completed upon award. When preparing our response to a prospective customer for a potential contract, we evaluate the contract requirements and determine and outline the services and products we can provide to fulfill the contract at a competitive price.

Many times for our defense programs, after the initial contract, subsequent follow-on contracts are awarded on a sole-source basis, subject to cost-justification and direct negotiation with our customer and in some cases, the federal government.

Our average sales cycle, which generally commences at the time a prospective customer issues a request for proposal and ends upon delivery of the final product to the customer, varies widely.

Because of the complexities inherent in the aerospace industry, the time from the initial request for proposal to award ranges from as little as a few weeks to several years. Additionally, our contracts have ranged from six months to as long as 10 years. Also, repeat and follow-on jobs for current contracts frequently provide additional opportunities with minimal start-up costs and rapid rates to production.

### The Market

We have positioned our Company to take advantage of opportunities in the military aerospace market to a broad customer base, thereby reducing the impact of direct government contracting limitations. Our success as a subcontractor to defense prime contractors has provided us with opportunities to act as a subcontractor to prime contractors in the production of commercial aircraft structures, which also reduced our exposure to government spending decisions.

Over time, our Company has expanded in both size and capabilities, with growth in our operational and global supply chain program management. These expansions have allowed us the ability to supply more complex aerostructure assemblies and aerosystems and structures in support of our government-based programs as well as to pursue opportunities within the commercial and business jet markets. Our capabilities have also allowed us to acquire MRO and kitting contracts.

Approximately $2.9 million and $3.3 million of our revenue for the years ended December 31, 2020 and 2019, respectively, were from customers outside the U.S. All other revenue for the years ended December 31, 2020 and 2019 has been attributable to customers within the U.S. We have no assets outside the U.S.

Government-based contracts are subject to national defense budget and procurement funding decisions that, accordingly, drive demand for our business in that market. Government spending and budgeting for procurement, operations and maintenance are affected not only by military action, but also the related fiscal consequences of these actions, as well as the political process.

### Backlog

We produce custom assemblies pursuant to long-term contracts and customer purchase orders. Funded backlog consists of aggregate funded values under such contracts and purchase orders, excluding the portion previously included in operating revenues pursuant to Accounting Standards Codification Topic 606 (“ASC606”). Unfunded backlog is the estimated amount of future orders under the expected duration of the program. Substantially all of our backlog is subject to termination at will and rescheduling, without significant penalty. Funds are often appropriated for programs or contracts on a yearly or quarterly basis, even though the contract may call for performance that is expected to take a number of years. Therefore, our funded backlog does not include the full value of our contracts.

The total backlog at December 31, 2020 is primarily comprised of long-term programs with Raytheon (NGJ-MB), Northrop Grumman (E-2D), USAF (T-38), Boeing (A-10), and Embraer (Phenom 300). Funded backlog is primarily from purchase orders under long-term contracts with Northrop Grumman (E-2D), Sikorsky (BLACK HAWK), Lockheed Martin (F-16V), and the USAF (T-38). Approximately 54% of the funded backlog at December 31, 2020 is expected to be recognized as revenue during 2021.

Our total backlog as of December 31, 2020 and 2019 was as follows:

| Backlog (Total) | December 31, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Funded | $169,567,000 | $147,647,000 |
| Unfunded | 306,618,000 | 414,231,000 |
| Total | $476,185,000 | $561,878,000 |

Approximately 96% of the total amount of our backlog at December 31, 2020 was attributable to government contracts, compared to 88% at December 31, 2019. Our backlog attributable to government contracts at December 31, 2020 and 2019 was as follows:

| Backlog (Government) | December 31, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Funded | $166,156,000 | $136,932,000 |
| Unfunded | 290,632,000 | 359,770,000 |
| Total | 456,788, 000 | $496,702,000 |

Our backlog attributable to commercial contracts at December 31, 2020 and 2019 was as follows:

| Backlog (Commercial) | December 31, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Funded | $3,411,000 | $10,715,000 |
| Unfunded | 15,986,000 | 54,461,000 |
| Total | $19,397,000 | $65,176,000 |

### Material and Parts

We subcontract production of substantially all parts incorporated into our products to third-party manufacturers under firm fixed price orders. Our decision to purchase certain components generally is based upon whether the components are available to meet required specifications at a cost and with a delivery schedule consistent with customer requirements. From time to time, we are required to purchase custom made parts from sole suppliers and manufacturers in order to meet specific customer requirements.

We obtain our raw materials from several commercial sources. Although certain items are only available from limited sources of supply, we believe that the loss of any single supplier would not have a material adverse effect on our business.

### Competition

We face competition in our role as both a prime contractor to the U.S. Government and as a Tier 1 or Tier 2 subcontractor to military and commercial aircraft manufacturers. Within our aerostructures capability, we often compete against much larger Tier 1 suppliers, such as Triumph Group, Spirit AeroSystems, Kaman Aerospace, GKN, Ducommun, and LMI Aerospace. We believe that we can compete effectively with these larger companies by delivering products with the same level of quality and performance at a better value for our customer. Within our aerosystems capability, such as our portfolio of EW and ISR integrated pod structures, we find more limited competition and are not aware of competition from any of the aerostructures companies mentioned above. In these cases, we typically compete with the internal manufacturing arm of our customer. We believe our unique skills related to integrated pod structures combined with a very efficient and generally much lower cost structure creates a competitive advantage for bidding on aerosystems contracts.

For certain unrestricted contracts for the U.S. Government, we may compete against well-established prime contractors, including NGC, Lockheed Martin, and Boeing. All of these competitors possess significantly larger infrastructures, greater resources and the capabilities to respond to much larger contracts. We believe that our competitive advantage lies in our ability to offer large contractor capabilities with the flexibility and responsiveness of a small company, while staying competitive in cost and delivering superior quality products. While larger prime contractors compete for significant modification awards, they generally do not compete for awards in smaller modifications, spares and replacement parts, even for aircraft for which they are the original manufacturer. In certain instances, the large prime contractors often subcontract much of the work they win to their Tier 1 suppliers so we also may act as a subcontractor to some of these major prime contractors. Further, in some cases these companies are not permitted to bid, for example when the U.S. Government designates a contract as a Small Business Set-Aside. In these restricted contracts for the U.S. Government, CPI Aero typically competes against numerous small business competitors. We believe we compete effectively against the smaller competitors because smaller competitors generally do not have the expertise we have in responding to requests for proposals for government contracts, nor will they typically have the more than 40 years of past performance in conducting thousands of contracts for the U.S. Government.

### COVID-19 Coronavirus Pandemic Impact on Our Business

The outbreak of the COVID-19 coronavirus was declared a pandemic by the World Health Organization during our first quarter of 2020. During the latter part of our first quarter and subsequent to our quarter end, the COVID-19 pandemic grew, causing non-essential businesses to shut down and many people to observe the shelter-in-place directive from our state government. Our business and operations and the industries in which we operate have been impacted by public and private sector policies and initiatives in the U.S. to address the transmission of COVID-19, such as the imposition of travel restrictions and the adoption of remote work. The COVID-19 pandemic has contributed to a general slowdown in the global economy, has adversely impacted the businesses of certain of our customers and suppliers, and, if it continues for an extended period of time, it could adversely impact our results of operations and financial condition. In response to the COVID-19 impact on our business, we have been and continue to actively mitigate costs. We have also been taking actions to preserve capital and protect the long-term needs of our businesses, including negotiating progress payments with our customers and reducing discretionary spending. For more information on the current and potential impact of the COVID-19 pandemic on our business, see Risk Factors included in Part I, Item 1A of this Comprehensive Form 10-K/A.

### Government Regulation

#### Environmental Regulation

We are subject to regulations administered by the U.S. Environmental Protection Agency, the U.S. Occupational Safety and Health Administration, various state agencies and county and local authorities acting in cooperation with federal and state authorities. Among other things, these regulatory bodies impose restrictions to control air, soil and water pollution, to protect against occupational exposure to chemicals, including health and safety risks, and to require notification or reporting of the storage, use and release of certain hazardous chemicals and substances. The extensive regulatory framework imposes compliance burdens and risks on us. Governmental authorities have the power to enforce compliance with these regulations and to obtain injunctions or impose civil and criminal fines in the case of violations.

The Comprehensive Environmental Response, Compensation and Liability Act of 1980 (“CERCLA”) imposes strict, joint and several liability on the present and former owners and operators of facilities that release hazardous substances into the environment. The Resource Conservation and Recovery Act of 1976 (“RCRA”) regulates the generation, transportation, treatment, storage and disposal of hazardous waste. In New York State, the handling, storage and disposal of hazardous substances are governed by the Environmental Conservation Law, which contains the New York counterparts of CERCLA and RCRA. In addition, the Occupational Safety and Health Act, which requires employers to provide a place of employment that is free from recognized and preventable hazards that are likely to cause serious physical harm to employees, obligates employers to provide notice to employees regarding the presence of hazardous chemicals and to train employees in the use of such substances.

Our operations require the use of a limited amount of chemicals and other materials for painting and cleaning, including solvents and thinners, which are classified under applicable laws as hazardous chemicals and substances. We have obtained a permit from the Town of Islip, New York, Building Division in order to maintain a paint booth containing flammable liquids.

#### Federal Aviation Administration Regulation

We are subject to regulation by the Federal Aviation Administration (“FAA”) under the provisions of the Federal Aviation Act of 1958, as amended. The FAA prescribes standards and licensing requirements for aircraft and aircraft components. We are subject to inspections by the FAA and may be subjected to fines and other penalties (including orders to cease production) for noncompliance with FAA regulations. Our failure to comply with applicable regulations could result in the termination of or our disqualification from some of our contracts, which could have a material adverse effect on our operations.

### Government Contract Compliance

Our government contracts and sub-contracts are subject to the procurement rules and regulations of the U.S. Government. Many of the contract terms are dictated by these rules and regulations. Specifically, cost-based pricing is determined under the Federal Acquisition Regulation (“FAR”), which provide guidance on the types of costs that are allowable in establishing prices for goods and services under U.S. Government contracts. For example, costs such as those related to charitable contributions, advertising, interest expense, and public relations are unallowable, and therefore not recoverable through sales. During and after the fulfillment of a government contract, we may be audited in respect of the direct and allocated indirect costs attributed thereto. These audits may result in adjustments to our contract costs. Additionally, we may be subject to U.S. Government inquiries and investigations because of our participation in government procurement. Any inquiry or investigation can result in fines or limitations on our ability to continue to bid for government contracts and fulfill existing contracts. We believe that we are in compliance with all federal, state and local laws and regulations governing our operations and have obtained all material licenses and permits required for the operation of our business.

The U.S. Government generally has the ability to terminate our contracts, in whole or in part, without prior notice, for convenience or for default based on performance. If a U.S. Government contract were to be terminated for convenience, we generally would be protected by provisions covering reimbursement for costs incurred on the contract and profit on those costs, but not the anticipated profit that would have been earned had the contract been completed. In the unusual circumstance where a U.S. Government contract does not have such termination protection, we attempt to mitigate the termination risk through other means. Termination resulting from our default may expose us to liability and could have a material adverse effect on our ability to compete for other contracts. The U.S. Government also has the ability to stop work under a contract for a limited period of time for its convenience. In the event of a stop work order, we generally would be protected by provisions covering reimbursement for costs incurred on the contract to date and for costs associated with the temporary stoppage of work on the contract. However, such temporary stoppages and delays could introduce inefficiencies for which we may not be able to negotiate full recovery from the U.S. Government, and could ultimately result in termination for convenience or reduced future orders on certain contracts. Additionally, we may be required to continue to perform for some period of time on certain of our U.S. Government contracts, even if the U.S. Government is unable to make timely payments.

### Insurance

We maintain a $2 million general liability insurance policy, a $100 million products liability insurance policy, and a $5 million umbrella liability insurance policy. Additionally, we maintain $15 million of director and officers’ insurance. We believe this coverage is adequate for claims that have been and may be brought against us, and for the types of products presently marketed because of the strict inspection standards imposed on us by our customers before they take possession of our products. Additionally, the FAR generally provide that we will not be held liable for any loss of or damage to property of the U.S. Government that occurs after the U.S. Government accepts delivery of our products and that results from any defects or deficiencies in our products unless the liability results from willful misconduct or lack of good faith on the part of our managerial personnel.

### Proprietary Information

None of our current assembly processes or products is protected by patents. We rely on proprietary know-how and information and employ various methods to protect the processes, concepts, ideas and documentation associated with our products. These methods, however, may not afford complete protection and there can be no assurance that others will not independently develop such processes, concepts, ideas and documentation.

CPI Aero® is a registered trademark of the Company.

### Human Capital Management

As of December 31, 2020, we had 267 full-time employees. We employ temporary personnel with specialized disciplines on an as-needed basis. We depend on a highly educated and skilled workforce. We seek to advance a diverse, equitable and inclusive work environment for all employees. Our ability to attract, develop and retain the best talent, particularly those with technical, engineering and science backgrounds or experience, is critical for us to execute our strategy and grow our businesses. Our management, with oversight from the Compensation & Human Resources Committee of our board of directors, monitors the hiring, retention and management of our employees and regularly conducts succession planning to ensure that we continue to cultivate the pipeline of talent needed to operate our business.

In addition, we have taken measures to protect our workforce in response to the COVID-19 pandemic, including allowing employees to work from home when possible and implementing safety protocols to support our essential employees required to work onsite, such as making changes to shift work to promote social distancing among our manufacturing personnel, and providing masks and hand sanitizer.

None of our employees is a member of a union. We believe that our relations with our employees are good.

## Risk factors

As filed, 46,396 characters.

In addition to other risks and uncertainties described in this Comprehensive Form 10-K/A, the following material risk factors should be carefully considered in evaluating our business because such factors may have a significant impact on our business, operating results, liquidity and financial condition. As a result of the risk factors set forth below, actual results did and could continue to differ materially from those projected in any forward-looking statements.

### Risks Related to the Restatement of our Prior Period Consolidated Financial Statements and Material Weaknesses in our Internal Control

***We have restated our consolidated financial statements during the past three years, including the restatement included in this Comprehensive Form 10-K/A. These restatements have affected and may continue to affect investor confidence, our stock price, our ability to raise capital in the future, and our reputation with our customers, have resulted and may continue to result in stockholder litigation and may reduce customer confidence in our ability to complete new contract opportunities.***

In February 2019, we filed an amended Quarterly Report on Form 10-Q/A for the nine months ended September 30, 2018, which included a restatement of our financial statements for the period then ended. The restatement of such financial statements corrected an overstatement of revenue in such period due to the miscoding of an invoice in the Company’s records (the “Coding Error”). In August 2020, we filed an Annual Report on Form 10-K for the year ended December 31, 2019, which included a restatement of our financial statements for the year ended December 31, 2018 to correct certain errors relating to our recognition of revenue, which errors resulted from an incorrect application of U.S. GAAP (the “Revenue Recognition Error”). This Comprehensive Form 10-K/A includes a restatement of our (i) consolidated balance sheet as of December 31, 2020 and December 31, 2019, and the related consolidated statements of operations, cash flows and shareholders’ deficit for the years ended December 31, 2020 and December 31, 2019, and (ii) consolidated balance sheets and statements of shareholders’ deficit as of March 31, 2020, June 30, 2020 and September 30, 2020, the related consolidated statements of operations for the three months ended March 31, 2020, the three and six months ended June 30, 2020 and the three and nine months ended September 30, 2020, and the consolidated statements of cash flows for the three, six and nine month periods ended March 31, 2020, June 30, 2020 and September 30, 2020, respectively, and related disclosures to correct the Inventory Costing Errors and the Insufficient Reserves. The Inventory Costing Errors resulted from software processing and coding errors, inconsistent units of measure being used for quantities ordered and quantities received of certain purchased parts, incorrect accruals to accounting periods of the cost of certain goods received and the Company not having a procedure to address over or under absorbed overhead costs at the end of accounting periods. The Insufficient Reserves resulted from insufficient inventory reserves and provisions for loss contracts. The existence of the Coding Error, Revenue Recognition Error, the Inventory Costing Errors and the Insufficient Reserves, along with this restatement and the prior restatements, have had and may continue to have the effect of eroding investor confidence in the Company and our financial reporting and accounting practices and processes, have negatively impacted and may continue to negatively impact the trading price of our common stock, have resulted and may continue to result in stockholder litigation, may make it more difficult for us to raise capital on acceptable terms, if at all, and may negatively impact our reputation with our customers and cause customers to place new orders with other companies.

***We have identified material weaknesses in our internal control over financial reporting which did and could continue to adversely affect our ability to report our financial condition and results of operations in a timely and accurate manner.***

As a result of the Inventory Costing Errors and the Insufficient Reserves, we have concluded that our internal control over financial reporting was not effective as of December 31, 2019, March 31, June 30, September 30, and December 31, 2020 and we have also concluded that our disclosure controls and procedures were not effective as of December 31, 2019 March 31, June 30, September 30 and December 31, 2020 due to material weaknesses in our internal control over financial reporting. In connection with the Revenue Recognition Error, we previously determined that our internal control over financial reporting and our disclosure controls and procedures were not effective as of December 31, 2019 and December 31, 2018, and in connection with the Coding Error, we previously determined that our internal control over financial reporting and our disclosure controls and procedures were not effective as of September 30, 2018. The Revenue Recognition Error, Inventory Costing Errors and the Insufficient Reserves caused us to fail to comply with the financial covenants under our credit facility with BankUnited, N.A. and the restatement of such errors was a contributing factor in our failure to timely file periodic reports required under the Exchange Act. The Revenue Recognition Error also resulted in shareholder litigation.

As described in Item 9A of this Comprehensive Form 10-K/A, we have taken a number of steps in order to strengthen our accounting function so as to allow us to be able to provide timely and accurate financial reporting, which have remediated the internal control deficiencies that led to the Revenue Recognition Error and the internal control deficiencies that led to the Coding Error which had been previously remediated. However, such steps were not sufficient to prevent the Inventory Costing Errors and the Insufficient Reserves and we cannot assure you that these steps will be successful in preventing future errors or that additional material weaknesses in our internal control over financial reporting will not arise or be identified in the future. To the extent these steps are not successful, we could be required to incur significant additional time and expense. Moreover, because of the inherent limitations of any control system, material misstatements due to error or fraud may not be prevented or detected and corrected on a timely basis, or at all. If we are unable to provide reliable and timely financial reports in the future, our business and reputation may be further harmed.

We intend to continue our remediation activities and to continue to improve our overall control environment and our operational and financial systems and infrastructure, as well as to continue to train, retain and manage our personnel who are essential to effective internal control. In doing so, we will continue to incur expenses and expend management’s time on compliance-related issues. However, we cannot ensure that the steps that we have taken or will take will successfully remediate the errors. If we are unable to successfully complete our remediation efforts or favorably assess the effectiveness of our internal control over financial reporting, our operating results, financial position, ability to accurately report our financial results and timely file our periodic reports under the Exchange Act, and our stock price could be adversely affected.

Additionally, beginning in the fourth quarter of 2019, the Company began using inventory valuation and cost collection software associated with its non-percentage of completion orders. There can be no assurance that controls over inventory will be adequate to address all potential valuation issues that may arise in the future relating to the use of the software and additional internal controls may need to be developed.

The occurrence of any future errors, misstatements, or failures in internal control may also cause us to fail to meet reporting obligations, negatively affect investor and customer confidence in our management and the accuracy of our financial statements and disclosures, result in events of default under our banking agreements, or result in adverse publicity and concerns from investors and customers, any of which could have a negative effect on the price of our common stock, subject us to regulatory investigations and penalties or additional stockholder litigation, and have a material adverse impact on our business and financial condition.

***The restatements of our consolidated financial statements due to the Coding Error, the Revenue Recognition Error, the Inventory Costing Errors and the Insufficient Reserves have diverted, and our ongoing efforts to remediate our internal control may continue to divert management from the operation of our business. The absence of timely and accurate financial information has hindered and may in the future hinder our ability to effectively manage our business.***

The restatements of our consolidated financial statements due to the Coding Error, the Revenue Recognition Error, the Inventory Costing Errors and the Insufficient Reserves have diverted, and our ongoing efforts to remediate our internal control may continue to divert management from the operation of our business. Our board of directors, members of management, and our accounting, and other staff have spent significant time on the restatements and remediation and will continue to spend significant time on remediation of internal control over our financial reporting. These resources have been, and will likely continue to be, diverted from the strategic and day-to-day management of our business and may have an adverse effect on our ability to accomplish our strategic objectives.

#### We face litigation relating to the Revenue Recognition Error.

Our Company and certain of our current and former executive officers and directors are defendants in litigation arising out of the Revenue Recognition Error in and restatements of our financial statements for the year ended December 31, 2018, and quarters ended March 31, 2018, June 30, 2018, September 30, 2018, March 31, 2019, June 30, 2019, and September 30, 2019. Please see Part I, Item 3, “Legal Proceedings.” These proceedings may result in significant expenses and the diversion of management attention from our business. We cannot ensure that additional litigation or other claims by shareholders will not be brought in the future arising out of the same subject matter.

***We received waivers of non-compliance with certain covenants under our credit facility with BankUnited and there can be no assurance that we will not fall out of compliance with our covenants in the future.***

The Company was not in compliance with certain financial covenants under its credit facility (the “BankUnited Facility”) with BankUnited, N.A. (“BankUnited”) for the year ended December 31, 2020 and the quarter ended March 31, 2021, and financial statement submission covenants for the year ended December 31, 2020 and the quarters ended March 31, 2021 and June 30, 2021 and obtained waivers of the non-compliance, as described in more detail in Part I, Item 7, “Management’s Discussion and Analysis of Financial Condition and Results of Operations – Recent Developments”. We cannot assure you that we will be in compliance with our covenants in the future or that BankUnited will grant further waivers if we fall out of compliance. If we fall out of compliance with our banking covenants, BankUnited may declare a default under the BankUnited Facility and, among other remedies, could declare the full amount of the BankUnited Facility immediately due and payable and could foreclose against our collateral. If this were to occur, we may be unable to secure outside financing, if needed, to fund ongoing operations and for other capital needs. Any sources of financing that may be available to us could also be at higher costs and require us to satisfy more restrictive covenants, which could limit or restrict our operations, cash flows and earnings. We cannot ensure that additional financing would be available to us, or be sufficient or available on satisfactory terms.

***We are currently ineligible to file a registration statement on Form S-3 to register the offer and sale of securities, which could adversely affect our ability to raise future capital.***

We did not file our Quarterly Reports for the three months ended March 31, 2021, June 30, 2021 and September 30, 2021 within the timeframe required by the SEC. We will regain status as a current filer when we file all of such Quarterly Reports. However, we will not be considered a timely filer and will not be eligible to file a short-form registration statement on Form S-3 to register the offer and sale of our securities until twelve full calendar months from the date we regain status as a current filer. If we wish to register the offer and sale of our securities to the public prior to such time, we will be required to use the long-form registration statement, Form S-1, which may increase both our transaction costs and the amount of time required to complete the transaction. This may adversely affect our ability to raise funds, if we choose to do so.

***If our common stock is delisted from the NYSE American exchange, our business, financial condition, results of operations and stock price could be adversely affected, and the liquidity of our stock and our ability to obtain financing could be impaired.***

On May 25, 2021, we received a notice from NYSE American LLC stating that our failure to timely file our Quarterly Report on Form 10-Q for the three months ended March 31, 2021 caused us to be out of compliance with the NYSE American LLC’s continued listing standards under the timely filing criteria included in Section 1007 of the NYSE American Company Guide (“Company Guide”). Also, our failure to timely file our Quarterly Reports on Form 10-Q for the three months ended June 30, 2021 and September 30, 2021 is an additional noncompliance with the NYSE American LLC’s continued listing standards under the timely filing criteria included in Section 1007 of the Company Guide.

In accordance with Section 1007 of the Company Guide, we had six months from May 24, 2021, or until November 24, 2021, to file the Form 10-Q for the period ended March 31, 2021 with the SEC. On November 23, 2021, the Company received a notice from NYSE American LLC informing the Company that it had accepted the Company’s plan to regain compliance with its standards for continued listing of the Company’s common stock under the timely filing criteria included in the Company Guide. NYSE American has granted the Company until April 14, 2022, to regain compliance with the timely filing criteria. If the Company is unable to cure the delinquency by April 14, 2022, the Company may request an additional extension up to the maximum cure period of May 24, 2022. In addition, if the Company does not make progress consistent with the plan during the plan period or if the Company does not complete its delayed filings with the SEC by the end of the maximum 12-month cure period on May 24, 2022, NYSE American staff will initiate delisting proceedings. There can be no assurance that we will be able to file the delayed filings as required.

On September 17, 2021, we received notice from NYSE American LLC indicating that the Company does not meet the continued listing standards set forth in Part 10 of the Company Guide. The Company is not in compliance with Section 1003(a)(i) of the Company Guide since it has stockholders’ equity of less than $2.0 million and losses from continuing operations and/or net losses in two of its three most recent fiscal years and Section 1003(a)(ii) of the Company Guide since it has stockholders’ equity of less than $4.0 million and losses from continuing operations and/or net losses in three of its four most recent fiscal years. The Company has therefore become subject to the procedures and requirements of Section 1009 of the Company Guide and was required to, and timely did, submit a plan to NYSE American LLC addressing how the Company intends to regain compliance with the continued listing standards by March 17, 2023 (the “Plan”). On November 19, 2021, we received notice from NYSE American LLC that it has accepted the Plan, subject to periodic review, including quarterly monitoring, for compliance with the Plan. If the Company is not in compliance with the continued listing standards by March 17, 2023 or if the Company does not make progress consistent with the Plan during the plan period, the NYSE Regulation staff may initiate delisting proceedings.

The delisting of our common stock from the NYSE American exchange would adversely affect our ability to attract new investors, decrease the liquidity of our outstanding shares of common stock, reduce our flexibility to raise additional capital, reduce the price at which our common stock trades, and increase the transaction costs inherent in trading such shares with overall negative effects for our stockholders.

### Risks Related to COVID-19

***The impact of the coronavirus (COVID-19) pandemic on our operations, supply chain, and customers has impacted and could continue to have a material adverse effect on our business, financial position, results of operations and/or cash flows.***

It is possible that the continued spread of COVID-19 could cause disruption in our supply chain or significantly increase the costs required to meet our contractual commitments, cause delay, or limit the ability of, the U.S. Government and other customers to perform, including making timely payments to us, negotiating contracts, performing quality inspections, accepting delivery of finished products, and cause other unpredictable events. The disruption of air travel has impacted demand for the commercial air industry. Commercial aircraft manufacturers are reducing production rates due to fewer expected aircraft deliveries and, as a result, may reduce demand for our products. There have been and may continue to be changes in our government and commercial customers’ priorities and practices, as our customers confront competing budget priorities and more limited resources. These changes may impact current and future programs, procurements, and funding decisions, which in turn could impact our results of operations.

The COVID-19 pandemic could also impact our liquidity. Slower production schedules, higher company medical costs, potential inability of our customers to make timely payments to us, and similar factors could impact our cash flows. A period of generating lower cash from operations could adversely affect our financial position. We implemented several plans to mitigate such risks, including requesting and obtaining progress payments from our customers and longer payment terms with our suppliers; however, we may not be successful in the future in these efforts. The extent to which COVID-19 impacts our cash flow will determine whether we need to obtain additional funding, which could be difficult to obtain. Due to uncertainty related to COVID-19 and its impact on us and the aerospace industry, and the volatility in the capital markets in general, access to financing may be reduced and we may have difficulty obtaining financing on terms acceptable to us or at all.

The extent to which COVID-19 affects our operations will depend on future developments, which are highly uncertain, including the duration of the outbreak, new information which may emerge concerning the severity of the coronavirus and the actions to contain the coronavirus or address its impact, among others. If significant portions of our workforce or our suppliers’ workforces are unable to work effectively, including because of illness, quarantines, government actions, facility closure or other restrictions in connection with the COVID-19 pandemic, our operations will likely be impacted. For example, COVID-19 related absences during the first quarter of 2021 contributed to a delayed financial closing process for the Original Form 10-K and our Quarterly Report on Form 10-Q for the three months ended March 31, 2021. Further absences may cause us to be unable to perform fully on our contracts and our costs may increase as a result of the COVID-19 outbreak. These cost increases may not be fully recoverable or adequately covered by insurance. In addition, the impact on our accounting staff and outside advisors may hamper our efforts to comply with our filing obligations with the SEC.

We continue to monitor the situation, to assess further possible implications to our business, supply chain and customers, and to take actions in an effort to mitigate adverse consequences. We cannot at this time predict the future impact of the COVID-19 pandemic, but it could have a material adverse effect on our business, financial position, results of operations and/or cash flows.

### Risks Related to our Business

### We depend on government contracts for a significant portion of our revenues.

We are a supplier, either directly or as a subcontractor, to the U.S. Government and its agencies. We depend on government contracts for a significant portion of our business. If we are suspended or barred from contracting with the U.S. Government, if our reputation or relationship with individual federal agencies were impaired, whether due to the restatements and errors in our financial statements or otherwise, or if the U.S. Government otherwise ceased doing business with us or significantly decreased the amount of business it does with us, our business, prospects, financial condition and operating results would be materially adversely affected.

### We face risks relating to government contracts.

The funding of U.S. Government programs is subject to congressional budget authorization and appropriation processes. For many programs, the U.S. Congress appropriates funds on a fiscal year basis even though a program may extend over several fiscal years. Consequently, programs are often only partially funded initially and additional funds are committed only as Congress makes further appropriations. Appropriations are driven by numerous factors, including geopolitical events, macroeconomic conditions, the ability of the U.S. Government to enact relevant legislation, such as appropriations bills and continuing resolutions, and the threat or existence of a government shutdown. U.S. Government appropriations for our programs and for defense spending generally may be impacted or delayed by the COVID-19 pandemic as governmental priorities and finances change. We cannot predict the extent to which total funding and/or funding for individual programs will be included, increased or reduced in budgets approved by Congress or be included in the scope of separate supplemental appropriations. In the event that appropriations for any of our programs becomes unavailable, or is reduced or delayed, our contract or subcontract under such program may be terminated or adjusted by the U.S. Government, which could have a material adverse effect on our future sales under such program, and on our financial position, results of operations and cash flows.

We also cannot predict the impact of potential changes in priorities due to military transformation and planning and/or the nature of war-related activity on existing, follow-on or replacement programs. A shift of government priorities to programs in which we do not participate and/or reductions in funding for or the termination of programs in which we do participate, unless offset by other programs and opportunities, could have a material adverse effect on our financial position, results of operations and cash flows.

In addition, the U.S. Government generally has the ability to terminate contracts, completely or in part, without prior notice, for convenience or for default based on performance. In the event of termination for the U.S. Government’s convenience, contractors are generally protected by provisions covering reimbursement for costs incurred on the contracts and profit on those costs but not the anticipated profit that would have been earned had the contract been completed. Termination by the U.S. Government of a contract for convenience could also result in the cancellation of future work on that program. Termination by the U.S. Government of a contract due to our default could require us to pay for re-procurement costs in excess of the original contract price, net of the value of work accepted from the original contract. Termination of a contract due to our default may expose us to liability and could have a material adverse effect on our ability to compete for contracts. Additionally, we are a subcontractor on some U.S. Government contracts. In these arrangements, the U.S. Government could terminate the prime contract for convenience or otherwise, without regard to our performance as a subcontractor. We can give no assurance that we would be awarded new U.S. Government contracts to offset the revenues lost as a result of the termination of any of our U.S. Government contracts.

### We have risks associated with competing in the bidding process for contracts.

We obtain many of our contracts through a competitive bidding process. In the bidding process, we face the following risks:

- we must bid on programs in advance of their completion, which may result in unforeseen technological difficulties or cost overruns;
- we must devote substantial time and effort to prepare bids and proposals for competitively awarded contracts that may not be awarded to us; and
- awarded contracts may not generate sales sufficient to result in profitability.

***Further consolidation in the aerospace industry could adversely affect our business and financial results.***

The aerospace and defense industry is experiencing significant consolidation, including among our customers, competitors and suppliers. While we believe we have positioned our Company to take advantage of opportunities to market to a broad customer base, which we believe will reduce the potential impact of industry consolidation, we cannot assure you that industry consolidation will not impact our business. Consolidation among our customers may result in delays in the awarding of new contracts and losses of existing business. Consolidation among our competitors may result in larger competitors with greater resources and market share, which could adversely affect our ability to compete successfully. Consolidation among our suppliers may result in fewer sources of supply and increased cost to us.

***We are subject to strict governmental regulations relating to the environment, which could result in fines and remediation expense in the event of non-compliance.***

We are required to comply with extensive and frequently changing environmental regulations at the federal, state and local levels. Among other things, these regulatory bodies impose restrictions to control air, soil and water pollution, to protect against occupational exposure to chemicals, including health and safety risks, and to require notification or reporting of the storage, use and release of certain hazardous substances into the environment. This extensive regulatory framework imposes significant compliance burdens and risks on us. In addition, these regulations may impose liability for the cost of removal or remediation of certain hazardous substances released on or in our facilities without regard to whether we knew of, or caused, the release of such substances. Furthermore, we are required to provide a place of employment that is free from recognized and preventable hazards that are likely to cause serious physical harm to employees, provide notice to employees regarding the presence of hazardous chemicals and to train employees in the use of such substances. Our operations require the use of a limited amount of chemicals and other materials for painting and cleaning that are classified under applicable laws as hazardous chemicals and substances. If we are found not to comply with any of these rules, regulations or permits, we may be subject to fines, remediation expenses and the obligation to change our business practice, any of which could result in substantial costs that would adversely affect our business operations and financial condition.

***We may be subject to fines and disqualification for non-compliance with Federal Aviation Administration (“FAA”) regulations.***

We are subject to regulation by the FAA under the provisions of the Federal Aviation Act of 1958, as amended. The FAA prescribes standards and licensing requirements for aircraft and aircraft components. We are subject to inspections by the FAA and may be subjected to fines and other penalties (including orders to cease production) for noncompliance with FAA regulations. Our failure to comply with applicable regulations could result in the termination of or our disqualification from some of our contracts, which could have a material adverse effect on our operations and financial condition.

***If our subcontractors or suppliers fail to perform their contractual obligations, our contract performance and our ability to obtain future business and our profitability could be materially and adversely impacted.***

Most of our contracts involve subcontracts with other companies upon which we rely to perform a portion of the services that we must provide to our customers. There is a risk that we may have disputes with our subcontractors, including disputes regarding the quality and timeliness of work performed by the subcontractor, customer concerns about the subcontract, our failure to extend existing task orders or issue new task orders under a subcontract, our hiring of personnel of a subcontractor, or disputes concerning payment. A failure by one or more of our subcontractors to satisfactorily provide on a timely basis the agreed-upon supplies or perform the agreed-upon services may materially and adversely affect our ability to perform our obligations as the prime contractor. Subcontractor performance deficiencies could result in a customer eliminating our ability to progress bill or terminating our contract for default. A prohibition on progress billing may have an adverse effect upon our cash flow and profitability and a default termination could expose us to liability and have a material adverse effect on our ability to compete for future contracts and orders. In addition, a delay in our ability to obtain components and equipment parts from our suppliers may affect our ability to meet our customers’ needs and may have a material adverse effect upon our profitability. For example, the COVID-19 pandemic has impacted, and continues to impact, our supply chain, as described above.

***Due to fixed contract pricing, increasing contract costs exposes us to reduced profitability and the potential loss of future business.***

Operating margin is adversely affected when contract costs that cannot be billed to customers are incurred. This cost growth can occur if estimates to complete a contract increase due to technical challenges or if initial estimates used for calculating the contract price were incorrect. The cost estimation process requires significant judgment and expertise. Reasons for cost growth may include unavailability and productivity of labor, the nature and complexity of the work to be performed, the effect of change orders, the availability of materials, the effect of any delays in performance, availability and timing of funding from the customer, natural disasters, pandemics, and the inability to recover any claims included in the estimates to complete. A significant increase in cost estimates on one or more programs could have a material adverse effect on our financial position or results of operations.

***We use estimates when accounting for contracts. Changes in estimates may affect our profitability and our overall financial position.***

We primarily recognize revenue from our contracts over the contractual period pursuant to ASC 606. Pursuant to ASC 606, revenue and gross profit are recognized as work is performed based on the relationship between actual costs incurred and total estimated costs at the completion of the contract. Recognized revenues that will not be billed under the terms of the contract until a later date are recorded on our consolidated balance sheet as an asset captioned “Contract assets.” Contracts where billings to date have exceeded recognized revenues are recorded on our consolidated balance sheet as a liability captioned “Contract liabilities.” Changes to the original estimates may be required during the term of the contract. Estimates are reviewed quarterly and the effect of any change in the estimated gross margin percentage for a contract is reflected in the consolidated financial statements in the period the change becomes known. ASC 606 requires the use of considerable estimates in determining revenues and profits and in assigning the amounts to accounting periods. As a result, there can be a significant disparity between earnings (both for accounting and taxes) as reported and actual cash received by us during any reporting period.

We continually evaluate all of the issues related to the assumptions, risks and uncertainties inherent with the application of ASC 606; however, there is no assurance that our estimates will be accurate. If our estimates are not accurate or a contract is terminated, we will be forced to adjust revenue in later periods. Furthermore, even if our estimates are accurate, we may have a shortfall in our cash flow and we may need to borrow money to pay for costs until the reported earnings materialize to actual cash receipts.

***If the contracts associated with our backlog were terminated, our financial condition and results of operations would be adversely affected.***

The maximum contract value specified under each contract that we enter into is not necessarily indicative of the revenues that we will realize under that contract. Because we may not receive the full amount we expect under a contract, we may not accurately estimate our backlog because the earnings of revenues on programs included in backlog may never occur or may change. Cancellations of pending contracts or terminations or reductions of contracts in progress would have a material adverse effect on our business, prospects, financial condition or results of operations.

### We may be unable to attract and retain personnel who are key to our operations.

Our success, among other things, is dependent on our ability to attract and retain highly qualified senior officers and engineers. Competition for key personnel is intense. Our ability to attract and retain senior officers and experienced, top rate engineers is dependent on a number of factors, including prevailing market conditions and compensation packages offered by companies competing for the same talent and our reputation in the industry. If our reputation is adversely affected, for instance due to our handling of the COVID-19 pandemic, we may be unable to recruit, hire, and retain talented personnel. The inability to hire and retain these persons may adversely affect our production operations and other aspects of our business.

***We are subject to the cyclical nature of the commercial aerospace industry, and any future downturn in the commercial aerospace industry or general economic conditions, including related to COVID-19, could adversely impact the demand for our products.***

Our business may be affected by certain characteristics and trends of the commercial aerospace industry or general economic conditions that affect our customers, such as fluctuations in the aerospace industry’s business cycle, varying fuel and labor costs, intense price competition and regulatory scrutiny, certain trends, including a possible decrease in aviation activity and a decrease in outsourcing by aircraft manufacturers or the failure of projected market growth to materialize or continue. In the event that these characteristics and trends adversely affect customers in the commercial aerospace industry, they may reduce the overall demand for our products. For example, the COVID-19 pandemic has significantly impacted, and continues to impact, the commercial aerospace industry, as described above.

***Our working capital requirements may negatively affect our liquidity and capital resources.***

Our working capital requirements can vary significantly, depending in part on the timing of new program awards and the payment terms with our customers and suppliers. If our working capital needs exceed our cash flows from operations, we would look to our cash balances and availability for borrowings under the BankUnited Facility to satisfy those needs, as well as potential sources of additional capital, which may not be available on satisfactory terms and in adequate amounts, if at all.

### We incur risks associated with new programs.

New programs with new technologies typically carry risks associated with design changes, development of new production tools, increased capital and funding commitments, ability to meet customer specifications, delivery schedules and unique contractual requirements, supplier performance, ability of the customer to meet its contractual obligations to us, and our ability to accurately estimate costs associated with such programs. In addition, any new program may not generate sufficient demand or may experience technological problems or significant delays in the regulatory or other certification or manufacturing and delivery schedule. If we were unable to perform our obligations under new programs to the customer’s satisfaction, if we were unable to manufacture products at our estimated costs, or if a new program in which we had made a significant investment was terminated or experienced weak demand, delays or technological problems, then our business, financial condition and results of operations could be materially adversely affected. This risk includes the potential for default, quality problems, or inability to meet specifications, as well as our inability to negotiate final pricing for program changes, and could result in low margin or forward loss contracts, and the risk of having to write-off contract assets if they were deemed to be unrecoverable. In addition, beginning new work on existing programs also carries risk associated with the transfer of technology, knowledge and tooling.

In order to perform on new programs, we may be required to expend up-front costs which may not have been negotiated in our selling price. Additionally, we may have made margin assumptions related to those costs, that in the case of significant program delays and/or program cancellations, or if we are not successful in negotiating favorable margin on scope changes, could cause us to experience margin degradation which may be material, for costs that are not recoverable. Such charges and the loss of up-front costs could have a material adverse impact on our liquidity.

***We are presently classified as a small business and the loss of our small business status may adversely affect our ability to compete for government contracts.***

We are presently classified as a small business under certain of the codes under the North American Industry Classification Systems (“NAICS”) industry and product specific codes that are regulated in the United States by the Small Business Administration. We are not considered a small business under all NAICS codes. While we do not presently derive a substantial portion of our business from contracts that are set-aside for small businesses, we are able to bid on small business set-aside contracts as well as contracts that are open to non-small business entities. As the NAICS codes are periodically revised, it is possible that we may lose our status as a small business. The loss of small business status would adversely affect our eligibility for special small business programs and limit our ability to collaborate with other business entities which are seeking to team with small business entities as may be required under a specific contract.

*Cyber security attacks, internal system or service failures may adversely impact our business and operations.*

Any system or service disruptions, including those caused by projects to improve our information technology systems, if not anticipated and appropriately mitigated, could disrupt our business and impair our ability to effectively provide products and related services to our customers and could have a material adverse effect on our business. We could also be subject to systems failures, including network, software or hardware failures, whether caused by us, third-party service providers, intruders or hackers, computer viruses, natural disasters, power shortages or terrorist attacks. Cyber security threats are evolving and include, but are not limited to, malicious software, phishing and other unauthorized attempts to gain access to sensitive, confidential or otherwise protected information related to us or our products, customers or suppliers, or other acts that could lead to disruptions in our business. The COVID-19 pandemic has forced many of our non-manufacturing employees to shift to work-from-home arrangements, which increases our vulnerability to email phishing, social engineering or “hacking” through our remote networks, and similar cyber-attacks aimed at employees working remotely. Because the techniques used by cyber-attackers to access or sabotage networks change frequently and may not be recognized until launched against a target, we may be unable to anticipate these tactics. Any such failures to prevent or mitigate cyber-attacks could cause loss of data and interruptions or delays in our business, cause us to incur remediation costs or subject us to claims and damage our reputation. In addition, the failure or disruption of our communications or utilities could cause us to interrupt or suspend our operations or otherwise adversely affect our business. Although we utilize various procedures and controls to monitor and mitigate the risk of these threats, including contracting with an outside cyber security firm to provide constant monitoring of our systems, and training our employees to recognize attacks, there can be no assurance that these procedures and controls will be sufficient. Our property and business interruption insurance may be inadequate to compensate us for all losses that may occur as a result of any system or operational failure or disruption which would adversely affect our business, results of operations and financial condition. Moreover, expenditures incurred in implementing cyber security and other procedures and controls could adversely affect our results of operations and financial condition.

***Our financial results may be adversely impacted by the failure to successfully execute or integrate acquisitions and joint ventures.***

The Company may evaluate potential acquisitions or joint ventures that align with our strategic objectives. The success of such activity depends, in part, upon our ability to identify suitable sellers or business partners, perform effective assessments prior to contract execution, negotiate contract terms, and, if applicable, obtain customer and government approval. These activities may present certain financial, managerial, staffing and talent, and operational risks, including diversion of management's attention from existing core businesses, difficulties integrating or separating businesses from existing operations, and challenges presented by acquisitions or joint ventures which may not achieve sales levels and profitability that justify the investments made. If the acquisitions or joint ventures are not successfully implemented or completed, there could be a negative impact on our financial condition, results of operations and cash flows.

***Our ability to utilize our tax benefits could be substantially limited if we fail to generate sufficient income or if we experience an “ownership change.”***

As of December 31, 2020, we had approximately $92.9 million of gross net operating losses (“NOLs”) for federal tax purposes and approximately $38.4 million of post-apportionment NOLs for state tax purposes. As a result of the Tax Cuts and Jobs Act of 2017 and the Coronavirus Aid, Relief, and Economic Security Act of 2020, NOLs arising before January 1, 2018, and NOLs arising after January 1, 2018, are subject to different rules. Our pre-2018 NOLs totaled approximately $78.8 million; these NOLs will expire in varying amounts from 2030 through 2039, if not utilized, and can offset 100% of future taxable income for regular tax purposes. Our NOLs arising in 2018, 2019 and 2020 can generally be carried back five years, carried forward indefinitely and can offset 100% of future taxable income for tax years before January 1, 2021 and up to 80% of future taxable income for tax years after December 31, 2020. Any NOLs arising on or after January 1, 2021, cannot be carried back, can generally be carried forward indefinitely and can offset up to 80% of future taxable income.

Our ability to fully recognize the benefits from our NOLs is dependent upon our ability to generate sufficient income prior to their expiration. In addition, our NOL carryforwards may be limited if we experience an ownership change as defined by Section 382 of the Internal Revenue Code (“Section 382”). In general, an ownership change under Section 382 occurs if 5% shareholders increase their collective ownership of the aggregate amount of our outstanding shares by more than 50 percentage points over a relevant lookback period. For the year ended December 31, 2020 we have determined that no ownership change occurred during the relevant lookback period that would limit our ability to use our NOLs, however the sale of additional equity securities in the future may trigger an ownership change under Section 382 which could significantly limit our ability to utilize our tax benefits.

## Properties

As filed, 616 characters.

CPI Aero’s executive offices and production facilities are situated in an approximately 171,000 square foot building located at 91 Heartland Blvd., Edgewood, New York 11717. We use approximately 131,000 square feet of this building for manufacturing space and 40,000 square feet for offices and laboratories for engineering and design work. CPI Aero occupies this facility under a lease that expires on April 30, 2023. On November 10, 2021, the Company executed the second amendment to the lease agreement for its manufacturing and office space, which extends the lease agreement’s expiration date to April 30, 2026.

## Legal proceedings

As filed, 8,713 characters.

### Settlement of Working Capital Dispute

In December 2018, the Company completed the acquisition of WMI from Air Industries for a purchase price of $7.9 million, subject to a potential post-closing working capital adjustment. Of the purchase price, $2 million was placed in escrow at closing and was to be released after the completion of the working capital adjustment and for indemnification contingencies. Air Industries objected to the Company’s calculation of the post-closing working capital adjustment and rejected the determination of BDO USA, LLP (“BDO”), the independent accountant appointed by the parties to resolve the dispute. On September 27, 2019, the Company filed a notice of motion in the Supreme Court of the State of New York, County of New York, against Air Industries seeking, among other things, a judgment against Air Industries in the amount of approximately $4.1 million. In October 2019, Air Industries and the Company jointly authorized the release to the Company of approximately $619,000 from escrow, which represented the value of certain undisputed items. On October 1, 2020, the court denied the Company’s motion on procedural grounds, holding that the Company must commence a special proceeding to obtain the relief sought. The court’s decision was made without prejudice and did not resolve the working capital dispute.

The Company and Air Industries entered into a settlement agreement dated as of December 23, 2020, to resolve the post-closing working capital adjustment dispute in exchange for the release to the Company of the $1,381,000 cash remaining in escrow. Such amount was released from escrow to the Company on December 28, 2020. As part of the settlement agreement CPI Aero agreed to give up the right to pursue the additional disputed working capital amount of approximately $2.1 million.

### Class Action Lawsuit

As previously disclosed, a consolidated class action lawsuit has been filed against the Company, Douglas McCrosson, the Company’s Chief Executive Officer, Vincent Palazzolo, the Company’s former Chief Financial Officer, and the two underwriters of the Company’s October 16, 2018 offering of common stock, Canaccord Genuity LLC and B. Riley FBR. The Amended Complaint in the action asserts claims on behalf of two plaintiff classes: (i) purchasers of the Company’s common stock issued pursuant to and/or traceable to the Company’s offering conducted on or about October 16, 2018; and (ii) purchasers of the Company’s common stock between March 22, 2018 through February 14, 2020. The Amended Complaint alleges that the defendants violated Sections 11, 12(a)(2), and 15 of the Securities Act by negligently permitting false and misleading statements to be included in the registration statement and prospectus supplements issued in connection with its October 16, 2018 securities offering. The Amended Complaint also alleges that the defendants violated Sections 10(b) and 20(a) of the Exchange Act, and Rule 10b-5 promulgated by the SEC, by making false and misleading statements in the Company’s periodic reports filed between March 22, 2018 through February 14, 2020. Plaintiff seeks unspecified compensatory damages, including interest; rescission or a rescissory measure of damages; unspecified equitable or injunctive relief; and costs and expenses, including attorney’s fees and expert fees. On February 19, 2021, the Company moved to dismiss the Amended Complaint. Plaintiff submitted a brief in opposition to the motion to dismiss on April 23, 2021.

On May 20, 2021, the parties reached a settlement, subject to court approval. On July 9, 2021, Plaintiff filed an unopposed motion for preliminary approval of the settlement. After satisfaction of our $750,000 retention, of which approximately $150,000 remained as of November 15, 2021, the settlement will be covered in large part by our directors’ and officers’ insurance.

### Shareholder Derivative Action

Four shareholder derivative actions have been filed against current members of our board of directors and certain of our current and former officers.

The first action (captioned Moulton v. McCrosson, et.al., No. 20-cv-02092) was filed in the United States District Court for the Eastern District of New York, and purports to assert derivative claims against the individual defendants for violations of Section 10(b) and 21(d) of the Exchange Act and breach of fiduciary duty, unjust enrichment, and contribution, and seeks to recover on behalf of the Company for any liability the Company might incur as a result of the individual defendants’ alleged misconduct. The complaint also seeks declaratory, equitable, injunctive, and monetary relief, as well as attorneys’ fees and other costs. On October 26, 2020, the plaintiff filed an amended complaint. On January 27, 2021, the Court stayed the action pursuant to a joint stipulation filed by the parties.

The second action (captioned Woodyard v. McCrosson, et al., Index No. 613169/2020) was filed on September 17, 2020, in the Supreme Court of the State of New York (Suffolk County), and purports to assert derivative claims against the individual defendants for breach of fiduciary duty and unjust enrichment, and seeks to recover on behalf of the Company for any liability the Company might incur as a result of the individual defendants’ alleged misconduct, along with declaratory, equitable, injunctive and monetary relief, as well as attorneys’ fees and other costs. On December 22, 2020, the parties filed a joint stipulation staying the action pending further developments in the class action.

The third action (captioned Berger v. McCrosson, et al., No. 1:20-cv-05454) was filed on November 10, 2020, in the United States District Court for the Eastern District of New York, and purports to assert derivative claims against current and former members of our board of directors, and certain of our current and former officers. The complaint, which is based on the shareholder’s inspection of certain corporate books and records, purports to assert derivative claims against the individual defendants for breach of fiduciary duty and unjust enrichment, and seeks to implement reforms to the Company’s corporate governance and internal procedures and to recover on behalf of the Company an unspecified amount of monetary damages. The complaint also seeks equitable, injunctive, and monetary relief, as well as attorneys’ fees and other costs.

On March 19, 2021, the parties to the Moulton and Berger actions filed a joint stipulation consolidating the actions and staying the consolidated action pending further developments in the class action.

The fourth action (captioned Wurst v. Bazaar, et al., Index No. 605244/2021) was filed on March 24, 2021, in the Supreme Court of the State of New York (Suffolk County), and purports to assert derivative claims against the Company’s current and former executive officers, certain board members, and the Company as a nominal defendant. The complaint purports to assert derivative claims against the individual defendants for breach of fiduciary duty, unjust enrichment, and waste of corporate assets, and seeks to recover on behalf of the Company for any liability the Company might incur as a result of the individual defendants’ alleged misconduct. The complaint also seeks declaratory, equitable, injunctive, and monetary relief, as well as attorneys’ fees and other costs. On April 12, 2021, the parties filed a joint stipulation staying the action pending further developments in the class action.

Each of these derivative actions is based substantially on the same facts alleged in the class action complaint summarized above.

### SEC Investigation

On May 22, 2020, the Company received a subpoena from the Securities and Exchange Commission (the “Commission”) Division of Enforcement (the “Division”) seeking documents and information relating, among other things, to previously disclosed errors in and restatement of the Company’s financial statements, the Company’s October 16, 2018 equity offering and the recent separation of the Company’s former Chief Financial Officers. By letter dated March 12, 2021, the Division Staff notified the Company that the Division has concluded its investigation and, based on the information the Division has as of such date, it does not intend to recommend an enforcement action by the Commission against the Company. The Division’s notice was provided under the guidelines described in the final paragraph of Securities Act Release No. 5310 which states in part that the notice “must in no way be construed as indicating that the party has been exonerated or that no action may ultimately result from the staff’s investigation.”

## Management's discussion and analysis

As filed, 90,349 characters.

The following discussion and analysis of our financial condition and results of operations should be read together with our consolidated financial statements and related notes appearing elsewhere in this Comprehensive Form 10-K/A. Some of the information contained in this discussion and analysis includes forward-looking statements involving risks and uncertainties and should be read together with the “Risk Factors” section of this Comprehensive Form 10-K/A. Such risks and uncertainties could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.

### Recent Developments

#### NYSE American Delinquency Notices

On May 25, 2021, we received a notice from NYSE American LLC stating that our failure to timely file our Quarterly Report on Form 10-Q for the three months ended March 31, 2021 caused us to be out of compliance with the NYSE American LLC’s continued listing standards under the timely filing criteria included in Section 1007 of the NYSE American Company Guide (“Company Guide”). Also, our failure to timely file our Quarterly Reports on Form 10-Q for the three months ended June 30, 2021 and September 30, 2021 is an additional noncompliance with the NYSE American LLC’s continued listing standards under the timely filing criteria included in Section 1007 of the Company Guide.

In accordance with Section 1007 of the Company Guide, we had six months from May 24, 2021, or until November 24, 2021, to file the Form 10-Q for the period ended March 31, 2021 with the SEC. On November 23, 2021, the Company received a notice from NYSE American LLC informing the Company that it had accepted the Company’s plan to regain compliance with its standards for continued listing of the Company’s common stock under the timely filing criteria included in the NYSE American Company Guide. NYSE American has granted the Company until April 14, 2022, to regain compliance with the timely filing criteria. If the Company is unable to cure the delinquency by April 14, 2022, the Company may request an additional extension up to the maximum cure period of May 24, 2022. In addition, if the Company does not make progress consistent with the plan during the plan period or if the Company does not complete its delayed filings with the SEC by the end of the maximum 12-month cure period on May 24, 2022, NYSE American staff will initiate delisting proceedings. There can be no assurance that we will be able to file the delayed filings as required.

On September 17, 2021, we received notice from NYSE American LLC indicating that the Company does not meet the continued listing standards set forth in Part 10 of the Company Guide. The Company is not in compliance with Section 1003(a)(i) of the Company Guide since it has stockholders’ equity of less than $2.0 million and losses from continuing operations and/or net losses in two of its three most recent fiscal years and Section 1003(a)(ii) of the Company Guide since it has stockholders’ equity of less than $4.0 million and losses from continuing operations and/or net losses in three of its four most recent fiscal years. The Company has therefore become subject to the procedures and requirements of Section 1009 of the Company Guide and was required to, and timely did, submit a plan to NYSE American LLC addressing how the Company intends to regain compliance with the continued listing standards by March 17, 2023 (the “Plan”). On November 19, 2021, we received notice from NYSE American LLC that has accepted the Plan, subject to periodic review, including quarterly monitoring, for compliance with the Plan. If the Company is not in compliance with the continued listing standards by March 17, 2023 or if the Company does not make progress consistent with the Plan during the plan period, the NYSE Regulation staff may initiate delisting proceedings, as appropriate.

See “Risk Factors - If our common stock is delisted from the NYSE American exchange, our business, financial condition, results of operations and stock price could be adversely affected, and the liquidity of our stock and our ability to obtain financing could be impaired”.

#### Restatement due to Inventory Costing Errors and Insufficient Reserves

As previously reported, on June 4, 2021, the audit and finance committee (the “Audit and Finance Committee”) of the board of directors of CPI Aerostructures, Inc. (the “Company”), determined, based on the recommendation of management and in consultation with CohnReznick LLP (“CohnReznick”), the Company’s independent registered public accounting firm, that the Company’s financial statements which were included in its Annual Report on Form 10-K for the year ended December 31, 2020 and Quarterly Reports on Form 10-Q for the quarters ended March 31, 2020, June 30, 2020, and September 30, 2020 as filed with the Securities and Exchange Commission (the “SEC”) should no longer be relied upon due to errors in such financial statements relating to the recording and reporting of inventory costing and related internal controls (the “Inventory Costing Errors”) and that management’s reports on the effectiveness of internal control over financial reporting, press releases, and investor communications describing the Company’s financial statements for such periods should no longer be relied upon. The Company’s management identified the Inventory Costing Errors during its inventory testing procedures for the preparation of the Company’s financial statements for the quarterly period ended March 31, 2021. At the time of the June 2021 disclosure, the Company estimated and disclosed that the Inventory Costing Errors were expected to increase 2020 net loss reported on the Annual Report on Form 10-K for the year ended December 31, 2020 by $1.9 million to $2.3 million. The Company has now determined that the Inventory Costing Errors increased 2020 net loss by $2,010,084.

The correction of the Inventory Costing Errors resulted in the determination that certain contracts were in a loss position and certain inventory items required additional reserves. The Company re-evaluated the sufficiency of its provisions for loss contracts and inventory reserves that it had previously recorded and concluded that increases to these reserves were required. The insufficient reserves resulting from such reserve increases are referred to as “Additional Inventory Reserves” and “Loss Contract Reserve” and are together referred to as the “Insufficient Reserves.” It was further determined by management that the appropriate starting point for increasing the Insufficient Reserves was during the fourth quarter of 2019.

On November 16, 2021, the Audit and Finance Committee determined, based on the analysis and recommendation of management and in consultation with CohnReznick, that the Company’s financial statements as of and for the period ended December 31, 2019 which were included in the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2019 should no longer be relied upon due to errors in such financial statements relating to the recording and reporting of the Insufficient Reserves, that, similarly, management’s reports on the effectiveness of internal control over financial reporting, press releases, and investor communications describing the Company’s financial statements for such period should no longer be relied upon, and stated that the Company expected to restate its Annual Report on Form 10-K for the years ended December 31, 2020 and December 31, 2019, and its Quarterly Reports on Form 10-Q for the quarters ended March 31, 2020, June 30, 2020, and September 30, 2020 as filed with the SEC (the “Original Forms 10-Q”) by filing a comprehensive Form 10-K/A.

The Company, upon conducting an analysis of the impact of the Insufficient Reserves on previously reported financial results, determined that net loss for the years ended December 31, 2020 and 2019 is $324,231 and $2,189,728, respectively, greater than the net loss reported in the Annual Report on Form 10-K for the fiscal year ended December 31, 2020 and the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2019.

Considering both the Inventory Costing Errors and the Insufficient Reserves, the Company determined that the net loss for the years ended December 31, 2020 and 2019 is $2,334,315 and $2,300,083, respectively, greater than the net loss reported in the Annual Report on Form 10-K for the fiscal year ended December 31, 2020 and the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2019 and net loss for the quarters ended March 31, 2020 and June 30, 2020 is $544,836 and $763,730, respectively, greater than the net loss reported in the respective Quarterly Reports on Form 10-Q for such periods and the net income for the quarter ended September 30, 2020 is $24,556 more than the net income reported in the Quarterly Report for such period.

The Inventory Costing Errors resulted from software processing and coding errors, inconsistent units of measure being used for quantities ordered and quantities received of certain purchased parts, incorrect accruals to accounting periods of the cost of certain goods received and the Company not having a procedure to address over or under absorbed overhead costs at the end of accounting periods. The Inventory Costing Errors affected the income reported with respect to the Company’s product lines for which revenue is recognized when a product ships to customers, which accounted for approximately 15% of total 2020 revenue (the “Non-POC Contracts”). The Inventory Costing Errors did not affect income reported with respect to the Company’s products for which revenue is recognized over time using percentage of completion accounting (the “POC Contracts”). The Loss Contract Reserve and the Additional Inventory Reserves also only affect the income reported with respect to the Company’s Non-POC Contracts, and do not affect the income reported with respect to the Company’s POC Contracts. The Inventory Costing Errors and the Insufficient Reserves did not affect either prior reported revenue or cash flow for fiscal 2020 and 2019.

Management has considered the effect of the Inventory Costing Errors and the Insufficient Reserves on the Company’s prior conclusions of the adequacy of its internal control over financial reporting and disclosure controls and procedures as of the end of each of the applicable periods. As a result of the Inventory Costing Errors and the Insufficient Reserves, management has determined that a material weakness existed in the Company’s internal control over financial reporting as of the end of the quarterly periods ended March 31, 2020, June 30, 2020, September 30, 2020 and for the years ended December 31, 2020 and 2019. See Part II Item 9A – Controls and Procedures within this Comprehensive Form 10-K/A for a description of these matters.

As a result of the restatement included herein caused by the Inventory Costing Errors and Insufficient Reserves, the Company is reporting herein net loss for the years ended December 31, 2020 and December 31, 2019 which is $2,334,315 and $2,300,083, respectively, greater than the net loss reported in the Original Form 10-K and the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2019, net loss for the quarters ended March 31, 2020 and June 30, 2020 which is $544,836 and $763,730, respectively, greater than the net loss reported in the respective Original Forms 10-Q, and net income for the quarter ended September 30, 2020 which is $24,556 greater than the net income reported in the Original Form 10-Q. The Inventory Costing Errors and the Insufficient Reserves did not affect reported revenue or cash flows for the years ended December 31, 2020 or December 31, 2019, or for the quarters ended March 31, June 30 and September 30, 2020.

This Comprehensive Form 10-K/A contains our audited restated annual financial statements as of and for the years ended December 31, 2020 and 2019, as well as our unaudited restated quarterly financial statements as of and for the quarters ended March 31, 2020, June 30, 2020 and September 30, 2020. The restatement is discussed below and in more detail within Part II, Item 8, Note 17, “Restatement of Previously Issued Consolidated Financial Statements” in the notes to the consolidated financial statements included in this Comprehensive Form 10-K/A.

#### Amendments and Waivers to the BankUnited Facility

On May 11, 2021, we entered into a Waiver and Seventh Amendment (“Seventh Amendment”) to an Amended and Restated Credit Agreement with the Lenders named therein and BankUnited as Sole Arranger, Agent and Collateral Agent, dated as of March 24, 2016 (as amended from time to time, the “Credit Agreement”). Under the Seventh Amendment, the parties amended the Credit Agreement by (a) extending the maturity date of the Company’s existing $24 million revolving line of credit and its existing $6.36 million term loan to July 31, 2022, and (b) amended the leverage ratio covenant for the fiscal quarters ending on and after March 31, 2021, to 4.0 to 1.0, determined at the end of each fiscal quarter for the trailing four-quarter period then ended (or, in the case of the fiscal quarter ended March 31, 2021, determined on an annualized basis for the three-quarter period then ended). Additionally, under the Seventh Amendment, BankUnited waived late delivery of certain financial information.

On October 28, 2021, we entered into a Waiver and Eighth Amendment (“Eighth Amendment”) to the Credit Agreement. Under the Eighth Amendment, the parties amended the Credit Agreement by (a) extending the maturity date of the Company’s existing revolving line of credit and its existing term loan to December 31, 2022, (b) reducing the aggregate revolving line of credit from $24 million to $21 million while eliminating the requirement to maintain a minimum $3.0 million in a combination of line of credit availability and unrestricted cash, (c) providing for the repayment of an additional $750,000 of the principal balance of the term loan in three installments of $250,000 on November 30, 2021, December 31, 2021 and March 31, 2022 in addition to $200,000 regular monthly principal payments through maturity, (d) amending the minimum debt service coverage ratio covenant for the fiscal quarters ending on and after June 30, 2021 to provide for a ratio of 1.5 to 1.0, and (e) amending the maximum leverage ratio covenant as follows: for the fiscal quarter ending on March 31, 2021 - 5.0 to 1.0; for the fiscal quarter ending June 30, 2021 - 4.75 to 1.0; for the fiscal quarter ending September 30, 2021 - 4.25 to 1.0 and for the fiscal quarter ended December 31, 2021 and thereafter - 4.0 to 1.0, determined at the end of each fiscal quarter for the trailing four-quarter period then ended (or, in the case of the fiscal quarter ended March 31, 2021, determined on an annualized basis for the three-quarter period then ended). Additionally, under the Eighth Amendment, BankUnited waived certain covenant non-compliance and waived temporarily, late delivery of certain financial information.

#### Paycheck Protection Program (PPP) Loan

As previously reported, on April 10, 2020, we obtained a loan from Dime Community Bank (formerly BNB Bank) as the lender (“Dime”), in the principal amount of $4,795,000 (“PPP Loan”) pursuant to the Paycheck Protection Program under the Coronavirus Aid, Relief, and Economic Security (CARES) Act as administered by the U.S. Small Business Administration (“SBA”).

On November 2, 2020, the Company applied to the lender for full forgiveness of the PPP loan, calculated in accordance with the terms of the CARES Act, as modified by the Paycheck Protection Flexibility Act.

On July 13, 2021, the Company received notification through Dime that the PPP Loan and accrued interest thereon have been fully forgiven by the SBA and that the forgiveness payment date was July 1, 2021. The forgiveness of the PPP Loan will be recognized during the Company’s third fiscal quarter ending September 30, 2021.

#### Impact of COVID-19

The impact that the recent COVID-19 pandemic will have on our business remains uncertain.

During late 2020, we began to experience an increased rate of employees testing positive for COVID-19 and we took steps to mitigate virus transmission within the workplace. These steps included adding a second manufacturing shift to lessen employee density on the manufacturing floor and to require most non-manufacturing personnel to work from home. These measures continued into the current year. These measures continued into the current year. Despite these measures, during the first three months of 2021 we experienced a relatively high level of absenteeism directly or indirectly related to COVID-19. We believe it is possible that the impact of the COVID-19 pandemic could have an adverse effect on the results of our operations, financial position and cash flow for the year ending December 31, 2021, particularly in the first fiscal quarter. We have taken mitigating steps in an attempt to reduce the adverse effects. For example, we have curtailed discretionary spending, deferred all business travel, and taken other steps to preserve cash. We have also taken action to more closely manage the flow of materials to be more responsive to unanticipated changes in customer delivery schedules. Since May 2021, we have seen a decrease in the impact of COVID-19 and most non-manufacturing personnel have returned to their regular in-person work schedules and we have returned to a single day shift operation.

### Certain Transactions

The following transactions occurred during the periods covered by this Management's Discussion and Analysis of Financial Condition and Results of Operations:

#### Acquisition of WMI

In December 2018, the Company completed the acquisition of WMI from Air Industries for a purchase price of $7.9 million, subject to a potential post-closing working capital adjustment. Of the purchase price, $2 million was placed in escrow at closing and was to be released after the completion of the working capital adjustment and for indemnification contingencies. Air Industries objected to the Company’s calculation of the post-closing working capital adjustment and rejected the determination of BDO USA, LLP (“BDO”), the independent accountant appointed by the parties to resolve the dispute. On September 27, 2019, the Company filed a notice of motion in the Supreme Court of the State of New York, County of New York, against Air Industries seeking, among other things, a judgment against Air Industries in the amount of approximately $4.1 million. In October 2019, Air Industries and the Company jointly authorized the release to the Company of approximately $619,000 from escrow, which represented the value of certain undisputed items. The remaining escrowed amount of approximately $1,381,000 is shown as restricted cash on the consolidated balance sheet. The additional disputed amount of approximately $2.1 million is not on the Company’s consolidated balance sheet due to the uncertainty of collection.

The Company and Air Industries entered into a settlement agreement dated as of December 23, 2020, to resolve the post-closing working capital adjustment dispute in exchange for the release to the Company of the $1,381,000 cash remaining in escrow. Such amount was released from escrow to the Company on December 28, 2020. As part of the settlement agreement CPI Aero agreed to give up the right to pursue the additional disputed working capital amount of approximately $2.1 million.

#### Honda Aircraft Company, Inc. Settlement and Release Agreement

In January 2020, the Company requested a modification to the recurring sales price contained in the Master Purchase Agreement dated January 14, 2019 (“Honda MPA”) with Honda Aircraft Company, Inc. (“HACI”) for the manufacture of engine inlet assemblies for the HondaJet aircraft. HACI denied the Company’s request. HACI and the Company subsequently commenced discussions that would result in the Company exiting the program. On December 23, 2020 HACI and the Company entered into a Settlement and Release Agreement that, subject to the terms and conditions therein, terminates the Honda MPA and cancels all remaining purchase orders placed with the Company thereunder.

#### Gulfstream G650 Program

On April 29, 2020, the Company received a letter from Triumph Group stating that due to the COVID-19 pandemic, it had received a significant schedule change from its customer, Gulfstream Aerospace, and requested that we immediately stop work on the contract we have to produce certain fixed leading edge assemblies on the wing of the G650 business jet. In May 2020, Triumph Group cancelled nearly all open orders with the Company, decreasing our G650 leading edge backlog by $3.6 million. On May 27, 2020, Triumph Group announced it had reached an agreement in principle to sell the G650 wing program to Gulfstream Aerospace. On June 12, 2020, the Company received a joint communication from Gulfstream Aerospace and Triumph Group that stated Gulfstream Aerospace’s intention at the conclusion of the transaction is to continue to purchase G650 wing components from the Company. In December 2020, the Company received purchase orders from Gulfstream Aerospace for G650 wing components.

### Business Operations

We are engaged in the contract production of structural aircraft parts for fixed wing aircraft and helicopters in both the commercial and defense markets. We also have a strong and growing presence in the aerosystems segment of the market, with our production of various reconnaissance pod structures and fuel panel systems. Within the global aerostructure and aerosystem supply chain, we are either a Tier 1 supplier to aircraft OEMs or a Tier 2 subcontractor to major Tier 1 manufacturers. We also are a prime contractor to the U.S. DOD, primarily the USAF. In conjunction with our assembly operations, we provide engineering, program management, supply chain management and kitting, and MRO services.

### Critical Accounting Policies

#### Revenue Recognition

Effective January 1, 2018, the Company adopted Accounting Standards Codification Topic 606, “Revenue from Contracts with Customers” (“ASC 606”), using the modified retrospective method. In accordance with ASC 606, the Company recognizes revenue when it transfers control of a promised good or service to a customer in an amount that reflects the consideration it expects to be entitled to in exchange for the good or service. The majority of the Company’s performance obligations are satisfied over time as the Company (i) sells products with no alternative use to the Company and (ii) has an enforceable right to recover costs incurred plus a reasonable profit margin for work completed to date. Under the overtime revenue recognition model, revenue and gross profit are recognized over the contract period as work is performed based on actual costs incurred and an estimate of costs to complete and resulting total estimated costs at completion. See Part II, Item 8, Note 2 “Revenue Recognition” in the notes to the consolidated financial statements included in this Comprehensive Form 10-K/A for additional information regarding the Company's revenue recognition policy.

#### Leases

In February 2016, the Financial Accounting Standards Board (“FASB”) issued Accounting Standards Update (“ASU”) No. 2016-02, “Leases (“ASC 842”)”, which sets out the principles for the recognition, measurement, presentation and disclosure of leases for both lessees and lessors. On January 1, 2019, the Company adopted the new lease standard using the optional transition method under which comparative financial information will not be restated and continue to apply the provisions of the previous lease standard in its annual disclosures for the comparative periods. In addition, the new lease standard provides a number of optional practical expedients in transition. The Company elected the package of practical expedients. As such, the Company did not have to reassess whether expired or existing contracts are or contain a lease; did not have to reassess the lease classifications or reassess the initial direct costs associated with expired or existing leases.

ASC 842 also provides practical expedients for an entity's ongoing accounting. The Company elected the short-term lease recognition exemption under which the Company will not recognize right-of-use (“ROU”) assets or lease liabilities, and this includes not recognizing ROU assets or lease liabilities for existing short-term leases. The Company elected the practical expedient to not separate lease and non-lease components for certain classes of assets (office building).

On January 1, 2019, the Company recognized ROU assets and lease liabilities of approximately $5.3 million and $5.9 million, respectively, on its consolidated balance sheet using an estimated incremental borrowing rate of 6%. As of December 31, 2020 the Company has ROU assets and lease liabilities of approximately $4.1 million and $4.4 million, respectively, on its consolidated balance sheet.

#### Goodwill

In January 2017, the FASB issued Accounting Standards Update No. 2017-04, “Intangibles - Goodwill and Other (Topic 350): Simplifying the Test for Goodwill Impairment (“ASU-2017-04). ASU 2017-04 is intended to simplify how all entities assess goodwill for impairment. This is accomplished by removing the requirement to determine the fair value of individual assets and liabilities in order to calculate a reporting unit’s “implied” goodwill. The goodwill impairment test consists of one step comparing the fair value of a reporting unit with its carrying amount. An entity should recognize a goodwill impairment charge for the amount by which the carrying amount exceeds the reporting unit’s fair value.

An entity may still perform the optional qualitative assessment for a reporting unit to determine if it is more likely than not that goodwill is impaired. However, the ASU 2017-04 eliminates the requirement to perform a qualitative assessment for any reporting unit with zero or negative carrying amount. The Company adopted ASU-2017-4 for the year ended December 31, 2020.

### Results of Operations

The following discussion provides an analysis of our results of operations and should be read in conjunction with the accompanying consolidated financial statements and notes thereto.

### Year Ended December 31, 2020 (as restated) as Compared to the Year Ended December 31, 2019 (as restated)

***Revenue.*** Revenue for the year ended December 31, 2020 was $87,584,690 compared to $87,518,688 for the year ended December 31, 2019, representing an increase of $66,002. We experienced revenue increases on our E2-D wing panel kits, our Pacer Classic III Phase 2 program with USAF as this effort transitions to Phase 3, and our Lockheed Martin F-16 Rudder Island program. The revenue increases were partially offset by decreases on our Raytheon NGJ-MB program as we transitioned to our follow on order, and on the G650 fixed leading edge program.

Overall, revenue generated from prime government contracts for the year ended December 31, 2020 was $9,115,983 compared to $6,429,860 for the year ended December 31, 2019, an increase of $2,686,123. This increase is primarily a result of increased revenue recognized on the T-38C Pacer Classic phase 2 aircraft structural modification program which is transitioning from Phase 2 to Phase 3. CPI Aero was awarded the Phase 3 contract in 2019.

Revenue generated from government subcontracts for the year ended December 31, 2020 was $70,106,741 compared to $62,319,526 for the year ended December 31, 2019, an increase of $7,787,215. The increase in revenue related to the start of a new multi-year award for the Northrop Grumman E2D program as well as increases related to the NGC WOWP, and the F16 Rudder Island program, offset by a decrease in the Raytheon NGJ-MB program as described above.

Revenue generated from commercial contracts was $8,361,966 for the year ended December 31, 2020 compared to $18,769,302 for the year ended December 31, 2019, a decrease of $10,407,336. Most of this decrease resulted from decreased production of the Gulfstream G650 fixed leading edge assembly. We also had year-over-year revenue declines in our program with Honda as we negotiated an exit to this unprofitable program. Revenue from Embraer also declined largely due to decreased business jet demand.

***Cost of sales.*** Cost of sales for the years ended December 31, 2020 and 2019 were $77,824,732 and $80,687,080, respectively, an increase of $2,862,348 or 4%.

The components of cost of sales were as follows:

|  | Years ended December 31, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Procurement | $56,337,476 | $49,920,962 |
| Labor | 6,414,658 | 7,870,728 |
| Factory overhead | 20,803,029 | 20,745,188 |
| Other cost of sales | (5,730,431) | 2,150,202 |
| Cost of sales | $77,824,732 | $80,687,080 |

Procurement for the year ended December 31, 2020 was $56,337,476 compared to $49,920,962 for the year ended December 31, 2019, an increase of $6,416,514 or 12.9%. This increase is primarily the result of an increase in procurement for the E2D and WOWP programs.

Labor costs for the year ended December 31, 2020 were $6,414,658 compared to $7,870,728 for the year ended December 31, 2019, a decrease of $1,456,070 or 18.5%. The decrease is primarily the result of the absence in 2020 of labor associated with the NGJ pod program, which was very labor intensive, as well as lower labor on the HondaJet and G650 programs.

Factory overhead costs for the year ended December 31, 2020 were $20,803,029 compared to $20,745,188 for the year ended December 31, 2019, an increase of $57,841 or 0.3%.

Other cost of sales relates to items that can increase or decrease cost of sales such as changes in inventory levels, changes in inventory valuation, changes to inventory reserves, changes in loss contract provisions and direct charges to cost of sales. For the year ended December 31, 2020, there was a reduction of costs in the amount of ($5,730,431), primarily the result of changes in inventory levels and reductions in loss contract reserves. For the year ended December 31, 2019, there was an increase in costs of $2,150,202, primarily the result of increases to loss contract provisions and inventory reserves.

***Gross profit***. Gross profit for the year ended December 31, 2020 was $9,759,958 compared to $6,831,608 for the year ended December 31, 2019, an increase of $2,928,350 or 43%. Gross profit percentage (“gross margin”) for the year ended December 31, 2020 was 11.1% compared to 7.8% for the same period last year. The increase was primarily on our E2-D kitting programs which experienced a growth in revenue, reduction in loss contract reserves and inventory provisions, as well as exit from unprofitable programs, partially offset by a decrease in gross profit on our NGJ-MB program due to lower volumes.

### Favorable/Unfavorable Adjustments to Gross Profit

During the years ended December 31, 2020 and 2019, we made changes in estimates to various contracts. Such changes in estimates resulted in changes in total gross profit as follows:

|  | Years Ended December 31, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Favorable adjustments | $2,241,357 | $409,226 |
| Unfavorable adjustments | (3,975,745) | (3,444,850) |
| Net adjustments | $(1,734,388) | $(3,035,624) |

31

### Selling, general and administrative expenses

Selling, general and administrative expenses (“SG&A”) for the year ended December 31, 2020 were $12,046,171 compared to $11,562,781 for the year ended December 31, 2019, an increase of $483,390 or 4.2%. This increase was primarily due to increased legal and accounting expenses compared to the prior period associated with the prior restatement of our consolidated financial statements for several prior periods.

### Interest expense

Interest expense for the year ended December 31, 2020 was $1,421,955, compared to $2,104,851 for the year ended December 31, 2019, a decrease of $682,896 or 32%. The decrease in interest expense is the result of continued principal repayment on our term loan with BankUnited, lower overall interest rates and a favorable 1% interest rate on our PPP Loan with the SBA which we are accruing but not paying. If the PPP loan is forgiven, the accrual will be reversed.

### Loss from operations

We had a loss from operations for the year ended December 31, 2020 of ($3,708,167) compared to a loss from operations of ($6,746,358) for the year ended December 31, 2019. This decrease in loss was primarily the result of lower loss contract reserves and inventory reserves recorded during the year.

***Provision (Benefit) for income taxes.*** The income tax (benefit) for the year ended December 31, 2020 was ($53,414), an effective tax rate of 1.4%. The tax benefit consists of a refund received from the 2014 NOL carryback claim and state minimum taxes. In February 2019, the Company received information that the net operating loss carryback that was utilized in 2014 was under examination and could possibly be partially disallowed by the Internal Revenue Service (“IRS”). This adjustment was an issue of timing of the loss and had no income tax provision effect. In June 2020, the Company received a letter from the IRS stating that the returns will be accepted as filed. In September 2020, the Company received additional refunds related to the tax years under examination. The examination is now closed and there is no uncertain tax position recorded for this item.

### Net Loss

Net loss for the year ended December 31, 2020 was $(3,654,753) or $(0.31) per basic share, compared to a loss of $(6,750,235) or $(0.57) per basic share, for the same period last year. Diluted loss per share was $(0.31) for the year ended December 31, 2020 calculated utilizing 11,884,307 weighted average shares outstanding. Diluted loss per share was $(0.57) for the year ended December 31, 2019 calculated utilizing 11,808,052 weighted average shares outstanding. The decrease in net loss was primarily driven by the decrease in cost of sales as described above.

### Business Outlook

The statements in the “Business Outlook” section and other forward-looking statements of this Comprehensive Form 10-K/A are subject to revision during the course of the year in our quarterly earnings releases and SEC filings and at other times.

#### Liquidity and Capital Resources

***General.*** At December 31, 2020, we had working capital of $7,674,974 compared to working capital of $11,551,636 at December 31, 2019, a decrease of $3,876,660, or 33.6%. This decrease is primarily the result of an increase in accounts payable and accrued expenses, partly offset by an increase in contract assets and inventory.

***Cash Flow***. A large portion of our cash is used to pay for materials and processing costs associated with contracts that are in process and which do not provide for progress payments. Costs for which we are not able to bill on a progress basis are components of contract assets on our consolidated balance sheet and represent the aggregate costs and related earnings for uncompleted contracts for which the customer has not yet been billed. These costs and earnings are recovered upon shipment of products and presentation of billings in accordance with contract terms.

Because ASC 606 requires us to use estimates in determining revenues, costs and profits and in assigning the amounts to accounting periods, there can be a significant disparity between earnings (both for accounting and tax purposes) as reported and actual cash that we receive during any reporting period. Accordingly, it is possible that we may have a shortfall in our cash flow and may need to borrow money or take steps to defer cash outflows until the reported earnings materialize into actual cash receipts.

Several of our programs require us to expend up-front costs that may have to be amortized over a portion of production units. In the case of significant program delays and/or program cancellations, we could experience margin degradation, which may be material for costs that are not recoverable. Such charges and the loss of up-front costs could have a material impact on our liquidity and results of operations.

We continue to work to obtain better payment terms with our customers, including accelerated progress payment arrangements, as well as exploring alternative funding sources.

At December 31, 2020, our cash balance was $6,033,537 compared to $4,052,109 at December 31, 2019, an increase of $1,981,428. Our accounts receivable balance at December 31, 2020 decreased to $4,962,906 from $7,029,602 at December 31, 2019.

### BankUnited Facility

On March 24, 2016, the Company entered into the BankUnited Facility. The Credit Agreement entered into in connection with the BankUnited Facility provided for a revolving credit loan commitment of $30 million (the “Revolving Loan”) and a $10 million term loan (“Term Loan”). The Revolving Loan bears interest at a rate as defined in the Credit Agreement.

On August 24, 2020, the Company entered into a Sixth Amendment and Waiver (the “Sixth Amendment”) to the Credit Agreement. Under the Sixth Amendment, the parties amended the Credit Agreement by extending the maturity date of the Revolving Loan and Term Loan to May 2, 2022 and making conforming changes to the repayment schedule of the Term Loan, by increasing the Term Loan by $6.0 million and reducing the Revolving Loan by $6.0 million. The maturities of the Term Loan are included in the maturities of long-term debt. The BankUnited Facility, as amended by the Sixth Amendment, required us to maintain the following financial covenants: (a) maintain a Fixed Cost (Debt Service) coverage ratio of no less than 1.5 to 1.0 at December 31, 2020 and no less than 1.25 to 1.0 for the trailing four quarter period at the end of each quarter thereafter; (b) maintain a minimum net income, after taxes, of no less than $1.00; (c) effective March 31, 2021, maintain a maximum leverage ratio at the end of each quarter for the trailing four quarter period of no more than 4.0 to 1.0; (d) maintain a minimum adjusted EBITDA at the end of each quarter of no less than $1 million; and (e) maintain a minimum liquidity of $3 million at all times. As of December 31, 2020, the Company was in compliance with all of the covenants contained in the BankUnited Facility as amended by the Eighth Amendment as described below. As of December 31, 2020 and December 31, 2019, the Company had $20.7 million and $26.7 million, respectively, outstanding under the BankUnited Facility.

On May 11, 2021, the Company entered into the Seventh Amendment. Under the Seventh Amendment, the parties amended the Credit Agreement by (a) extending the maturity date of the $24 million Revolving Loan and $6.36 million Term Loan to July 31, 2022, and (b) amending the leverage ratio covenant for the fiscal quarters ending on and after March 31, 2021, to 4.0 to 1.0, determined at the end of each fiscal quarter for the trailing four-quarter period then ended (or, in the case of the fiscal quarter ended March 31, 2021, determined on an annualized basis for the three-quarter period then ended). Additionally, under the Seventh Amendment, BankUnited waived late delivery of certain financial information. See Part II, Item 8, Note 18, “Subsequent Events” in the notes to the consolidated financial statements included in this Comprehensive Form 10-K/A for a discussion of the Seventh Amendment.

On October 28, 2021, the Company entered into the Eighth Amendment. Under the Eighth Amendment, the parties amended the Credit Agreement by (a) extending the maturity date of the Revolving Loan and the Term Loan to December 31, 2022, (b) reducing the aggregate revolving line of credit from $24 million to $21 million while eliminating the requirement to maintain a minimum $3.0 million in a combination of line of credit availability and unrestricted cash, (c) providing for the repayment of an additional $750,000 of the principal balance of the term loan in three installments of $250,000 on November 30, 2021, December 31, 2021 and March 31, 2022 in addition to $200,000 regular monthly principal payments through maturity, (d) amending the minimum debt service coverage ratio covenant for the fiscal quarters ending on and after June 30, 2021 to provide for a ratio of 1.5 to 1.0, and (e) amending the maximum leverage ratio covenant as follows: for the fiscal quarter ending on March 31, 2021 - 5.0 to 1.0; for the fiscal quarter ending June 30, 2021 - 4.75 to 1.0; for the fiscal quarter ending September 30, 2021 - 4.25 to 1.0 and for the fiscal quarter ended Deccember 31, 2021 and thereafter - 4.0 to 1.0, determined at the end of each fiscal quarter for the trailing four-quarter period then ended (or, in the case of the fiscal quarter ended March 31, 2021, determined on an annualized basis for the three-quarter period then ended). Additionally, under the Eighth Amendment, BankUnited waived certain covenant non-compliance and waived temporarily, late delivery of certain financial information. See Part II, Item 8, Note 18, “Subsequent Events” in the notes to the consolidated financial statements included in this Comprehensive Form 10-K/A for a discussion of the Eighth Amendment.

### PPP Loan

On April 10, 2020, we entered into the PPP Loan with Dime as the Lender, in an aggregate principal amount of $4,795,000, pursuant to the Paycheck Protection Program under the CARES Act. The PPP Loan was evidenced by a promissory note (“Note”). Subject to the terms of the Note, the PPP Loan bore interest at a fixed rate of one percent (1%) per annum, with the first six months of interest deferred, had an initial term of two years, and was unsecured and guaranteed by the SBA. The Note provided for customary events of default including, among other things, cross-defaults on any other loan with the Lender. The PPP Loan may be accelerated upon the occurrence of an event of default.

On November 2, 2020, the Company applied to the Lender for full forgiveness of the PPP Loan as calculated in accordance with the terms of the CARES Act, as modified by the Paycheck Protection Flexibility Act. On July 13, 2021, the Company received notification through Dime that the PPP Loan and accrued interest thereon have been fully forgiven by the SBA and that the forgiveness payment date was July 1, 2021. The forgiveness of the PPP Loan will be recognized during the Company’s third fiscal quarter ending September 30, 2021.

We believe that our existing resources will be sufficient to meet our current working capital needs for at least the next 12 months from the date of issuance of our consolidated financial statements. However, our working capital requirements can vary significantly, depending in part on the timing of new program awards and the payment terms with our customers and suppliers. If our working capital needs exceed our cash flows from operations, we would look to our cash balances and availability for borrowings under our borrowing arrangement to satisfy those needs, as well as potential sources of additional capital, which may not be available on satisfactory terms and in adequate amounts, if at all.

***Contractual Obligations.*** The table below summarizes information about our contractual obligations as of December 31, 2020 and the effects these obligations are expected to have on our liquidity and cash flow in the future years:

| Contractual Obligations | Payments Due By Period Total | Less than 1 year | 1-3 years | 4-5 years | After 5 years |
| --- | ---: | ---: | ---: | ---: | ---: |
| Debt | $12,028,333 | $6,245,833 | $5,782,500 | $— | $— |
| Finance Lease Obligations | 678,428 | 255,833 | 351,614 | 70,981 | — |
| Operating Leases | 4,356,386 | 1,819,237 | 2,537,149 | — | — |
| Total Contractual Cash Obligations | $17,063,147 | $8,320,903 | $8,671,263 | $70,981 | $— |

***Inflation.*** Inflation historically has not had a material effect on our operations.

### Three and Nine Months Ended September 30, 2020 (as restated) as Compared to the Three and Nine Months Ended September 30, 2019

The following discussion should be read in conjunction with the Company’s consolidated financial statements and notes thereto contained in this report.

### Backlog

We produce custom assemblies pursuant to long-term contracts and customer purchase orders. Funded backlog consists of aggregate funded values under such contracts and purchase orders, excluding the portion previously included in operating revenues pursuant to ASC 606. Unfunded backlog is the estimated amount of future orders under the expected duration of the programs. Substantially all of our backlog is subject to termination at will and rescheduling, without significant penalty. Funds are often appropriated for programs or contracts on a yearly or quarterly basis, even though the contract may call for performance that is expected to take a number of years. Therefore, our funded backlog does not include the full value of our contracts. Our total backlog as of September 30, 2020 and December 31, 2019 was as follows:

| Backlog (Total) | September 30, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Funded | $189,600,000 | $147,647,000 |
| Unfunded | 347,300,000 | 414,231,000 |
| Total | $536,900,000 | $561,878,000 |

Approximately 89% of the total amount of our backlog at September 30, 2020 was attributable to government contracts. Our backlog attributable to government contracts at September 30, 2020 and December 31, 2019 was as follows:

| Backlog (Government) | September 30, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Funded | $183,900,000 | $136,932,000 |
| Unfunded | 296,300,000 | 359,770,000 |
| Total | $480,200,000 | $496,702,000 |

Our backlog attributable to commercial contracts at September 30, 2020 and December 31, 2019 was as follows:

| Backlog (Commercial) | September 30, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Funded | $5,700,000 | $10,715,000 |
| Unfunded | 51,000,000 | 54,461,000 |
| Total | $56,700,000 | $65,176,000 |

The total backlog at September 30, 2020 is primarily comprised of long-term programs with Raytheon (NGJ-MB), Northrop Grumman (E-2D and Wet Outer Wing Panel (“WOWP”)), U.S. Air Force (T-38), Boeing A-10, HIRRS (Hovering InfraRed Suppression System), Embraer E175, F16 Rudder Island, and Sikorsky Stabilator. Funded backlog is primarily from purchase orders under long-term contracts with Northrop Grumman (E-2D and WOWP), Raytheon (NGJ-MB), Boeing A-10, HIRRS, and U.S. Air Force (T-38).

### Results of Operations

### Revenue

Revenue for the three months ended September 30, 2020 was $25,576,718 compared to $22,689,762 for the same period last year, an increase of $2,886,956 or 12.7%. The increase was primarily related to the new multi-year award for the Northrop Grumman E2D program as well as increases related to the programs T-38 Pacer, Northrop Grumman WOWP and the F16 Rudder Island. These revenue increases were offset primarily by the Raytheon NGJ-MB program, which was essentially complete by December 31, 2019. There was also a decrease in the G650 program.

Revenue for the nine months ended September 30, 2020 was $62,175,872 compared to $64,779,858 for the same period last year, a decrease of $2,603,986 or 4%. The year to date decrease was driven by the Raytheon NGJ-MB program and the G650 program as described above. In addition, we had year to date decreases in the Sikorsky fuel panels and WPA (Weapons Pylon Assembly) programs.

Revenue from government subcontracts was $20,887,968 for the three months ended September 30, 2020 compared to $16,179,389 for the three months ended September 30, 2019, an increase of $4,708,579 or 29%. The increase in revenue related to the start of a new multi-year award for the Northrop Grumman E2D program as well as increases related to the following programs NGC WOWP, and F16 Rudder Island, and was partially offset by a decrease in the Raytheon NGJ-MB program as described above.

Revenue from government subcontracts was $47,829,529 for the nine months ended September 30, 2020 compared to $44,592,902 for the nine months ended September 30, 2019, an increase of $3,236,627 or 7.2%. The increase was primarily related to the Raytheon NGJ-MB program as described above and the Sikorsky fuel panels and WPA programs offset by increases in the following programs NGC E2D, WOWP, F16 Rudder Island, Lockheed Martin F35 and the Boeing A10.

Revenue from direct military contracts was $3,778,686 for the three months ended September 30, 2020 compared to $1,702,951 for the three months ended September 30, 2019, an increase of $2,075,735 or 121.9%. The increase in revenue is primarily driven by an increase in revenue from the Pacer Classic III program which will vary period to period due to the nature of indefinite delivery indefinite quantity (“IDIQ”) contracts.

Revenue from direct military contracts was $7,947,977 for the nine months ended September 30, 2020 compared to $5,690,080 for the nine months ended September 30, 2019, an increase of $2,257,897 or 39.7%. The increase in revenue is primarily driven by an increase in revenue from the Pacer Classic III program mentioned above offset by a decrease in WMI programs.

Revenue from commercial subcontracts was $910,064 for the three months ended September 30, 2020 compared to $4,807,422 for the three months ended September 30, 2019, a decrease of $3,897,358 or 81%. The decrease is primarily the result of lower revenue from the G650 program and lower revenue from the Embraer program.

Revenue from commercial subcontracts was $6,398,366 for the nine months ended September 30, 2020 compared to $14,496,876 for the nine months ended September 30, 2019, a decrease of $8,098,510 or 55.9%. The decrease is driven by the same programs as the quarterly decrease mentioned above.

### Cost of Sales

Cost of sales for the three months ended September 30, 2020 and 2019 was $21,369,687 and $20,757,649, respectively, an increase of $612,038 or 2.9%. The increase in this quarter is substantially less than the increase in revenue due to more margin contribution from higher margin defense programs, and decreases to the loss contract reserve.

Cost of sales for the nine months ended September 30, 2020 and 2019 was $55,999,518 and $58,120,687, respectively, a decrease of $2,121,169 or 3.6%. This decrease is due to more margin contribution from higher margin defense programs offset by changes in inventory levels.

The components of the cost of sales were as follows:

|  | Three months ended September 30, 2020 | September 30, 2019 | Nine months ended September 30, 2020 | September 30, 2019 |
| --- | ---: | ---: | ---: | ---: |
| Procurement | $17,422,838 | $11,941,699 | $39,301,649 | $37,128,787 |
| Labor | 1,670,257 | 1,967,144 | 4,919,711 | 5,876,663 |
| Factory OH | 4,715,955 | 5,164,788 | 15,032,135 | 15,088,391 |
| Inventory Change | (1,748,037) | 1,647,414 | (3,310,199) | (764,898) |
| Other costs (credit) | (691,326) | 36,604 | 56,222 | 791,744 |
| **Cost of sales** | **$21,369,687** | **$20,757,649** | **$55,999,518** | **$58,120,687** |

36

Procurement for the three months ended September 30, 2020 was $17,422,838 compared to $11,941,699 for the three months ended September 30, 2019, an increase of $5,481,139 or 45.9%. This increase is primarily the result of an increase in procurement for the E2D and WOWP programs.

Procurement for the nine months ended September 30, 2020 was $39,301,649 compared to $37,128,787 for the nine months ended September 30, 2019, an increase of $2,172,862 or 5.9%. This increase was primarily due to an increase in procurement for the E2D and WOWP programs.

Labor costs for the three months ended September 30, 2020 were $1,670,257 compared to $1,967,144 for the three months ended September 30, 2019, a decrease of $296,887 or 15.1%. The decrease is primarily the result of lower direct labor requirements on the Raytheon NGJ-MB, Honda Jet and G650 programs.

Labor costs for the nine months ended September 30, 2020 were $4,919,711 compared to $5,876,663 for the nine months ended September 30, 2019, a decrease of $956,952 or 16.3%. The decrease is primarily the result of the absence in 2020 of labor associated with the NGJ pod program, which was very labor intensive, as well as lower labor on the HondaJet and G650 programs.

Factory overhead for the three months ended September 30, 2020 was $4,715,955 compared to $5,164,788 for the three months ended September 30, 2019, a decrease of $448,833 or 8.7%. This decrease is primarily due to a decrease in factory supplies and indirect labor.

Factory overhead for the nine months ended September 30, 2020 was $15,032,135 compared to $15,088,391 for the nine months ended September 30, 2019, a decrease of $56,256 or 0.4%.

Changes in inventory for the three months ended September 30, 2020 resulted in a change to cost of sales (COS) of $(1,748,037) compared to $1,647,414 for the three months ended September 30, 2019 primarily due to changes in investment in the WMI product line.

Changes in inventory for the nine months ended September 30, 2020 resulted in a change to COS of $(3,310,199) compared to $(764,898) for the nine months ended September 30, 2019 primarily due to changes in investment in the WMI product line.

Other costs (credit), net for the three months ended September 30, 2020 were $(691,326) compared to $36,604 for the three months ended September 30, 2019 primarily the result of changes to loss contract reserves, absorption variances and other direct charges to cost of goods sold.

Other costs (credit), net for the nine months ended September 30, 2020 were $56,222 compared to $791,944 for the nine months ended September 30, 2019 primarily the result of changes to loss contract reserves, inventory reserves absorption variances and other direct charges to cost of goods sold.

### Gross Profit

Gross profit for the three months ended September 30, 2020 was $4,207,031 compared to $1,932,113 for the three months ended September 30, 2019, an increase of $2,274,918 or 117.7%. This was primarily the result of an increase in revenue on higher margin defense programs.

Gross profit for the nine months ended September 30, 2020 was $6,176,354 compared to $6,659,171 for the nine months ended September 30, 2019, a decrease of $482,817 or 7.3%, primarily driven by increases to the loss contract reserves and inventory reserves offset by a favorable mix of higher margin defense programs offset by lower revenue.

### Favorable/Unfavorable Adjustments to Gross Profit (Loss)

During the nine months ended September 30, 2020 and 2019, circumstances required that we make changes in estimates to various contracts. Such changes in estimates resulted in changes in total gross profit as follows:

|  | Nine months ended September 30, 2020 | September 30, 2019 |
| --- | ---: | ---: |
| Favorable adjustments | $1,670,388 | $1,483,225 |
| Unfavorable adjustments | (2,831,947) | (1,609,212) |
| Net adjustments | $(1,161,559) | $(125,987) |

37

### Selling, General and Administrative Expenses

Selling, general and administrative expenses for the three months ended September 30, 2020 were $3,050,644 compared to $2,806,498 for the three months ended September 30, 2019, an increase of $244,146 or 8.7%. This increase was primarily driven by an increase in professional fees related to the restatement of our prior period financial statements, conducted during the first half of 2020.

Selling, general and administrative expenses for the nine months ended September 30, 2020 were $8,958,986 compared to $8,259,945 for the nine months ended September 30, 2019, an increase of $699,041 or 8.5%. This increase was driven by an increase in professional fees related to the restatement, offset by decreases in WMI moving expenses and salaries.

### Income (Loss) Before Provision for Income Taxes

Income (loss) before provision for income taxes for the three months ended September 30, 2020 was $847,379 compared to $(1,252,580) for the same period last year, an increase in income of $2,099,959 or 167.7%. The increase was driven by a combination of an increase in gross profit as a result of an increase in revenue and a favorable program mix, an increase in SG&A expenses as a result of increased accounting and legal fees related to the restatement and a decrease in interest expense.

Income (loss) before provision for income taxes for the nine months ended September 30, 2020 was $(3,868,437) compared to $(3,065,150) for the same period last year, an increase in loss of $803,287 or 26.2%. The increase in loss is a combination of a decrease in gross profit as a result of unfavorable program mix, additional inventory reserves and increase in SG&A expenses as a result of increased accounting and legal fees related to the restatement and a decrease in interest expense.

### Provision for Income Taxes

Provision for income taxes was $9,714 for the nine months ended September 30, 2020, compared to a provision for income taxes of $5,784 for the nine months ended September 30, 2019. The tax provision relates to state minimum and franchise taxes for the year.

### Net Income (Loss)

Net income (loss) for the three months ended September 30, 2020 was $839,765 or $0.07 per basic share, compared to a loss of $(1,255,051) or $(0.11) per basic share, for the same period last year. Diluted income (loss) per share was $0.07 for the three months ended September 30, 2020 calculated utilizing 11,917,149 weighted average shares outstanding. Diluted income (loss) per share was $(0.11) for the three months ended September 30, 2019 calculated utilizing 11,838,862 weighted average shares outstanding. The decrease in net loss was primarily driven by an increase in gross profit, as well as an increase in SG&A.

Net loss for the nine months ended September 30, 2020 was $(3,878,151) or $(0.33) per basic share, compared to a loss of $(3,070,934) (restated) or $(0.26) per basic share, for the same period last year. Diluted income (loss) per share was $(0.33) for the nine months ended September 30, 2020 calculated utilizing 11,862,506 weighted average shares outstanding. Diluted loss per share was $(0.26) for the nine months ended September 30, 2019 calculated utilizing 11,796,580 weighted average shares outstanding. The decrease in net loss was primarily driven by an increase in gross profit, an increase in SG&A, offset by lower interest expense.

### Liquidity and Capital Resources

### General

At September 30, 2020, we had working capital of $8,900,938 compared to working capital of $11,551,636 at December 31, 2019, a decrease of $2,650,698 or 22.9%.

### Cash Flow

A large portion of our cash flow is used to pay for materials and processing costs associated with contracts that are in process and which do not provide for progress payments. Costs for which we are not able to bill on a progress basis are components of “Contract assets” on our consolidated balance sheets and represent the aggregate costs and related earnings for uncompleted contracts for which the customer has not yet been billed. These costs and earnings are recovered upon shipment of products and presentation of billings in accordance with contract terms.

Because ASC 606 requires us to use estimates in determining revenue, costs and profits and in assigning the amounts to accounting periods, there can be a significant disparity between earnings (both for accounting and tax purposes) as reported and actual cash that we receive during any reporting period. Accordingly, it is possible that we may have a shortfall in our cash flow and may need to borrow money, or to raise additional capital, until the reported earnings materialize into actual cash receipts.

Several of our programs require us to expend up-front costs that may have to be amortized over a portion of production units. In the case of significant program delays and/or program cancellations, we could be required to bear impairment charges, which may be material for costs that are not recoverable. Such charges and the loss of up-front costs could have a material impact on our liquidity and results of operations.

We continue to work to obtain better payment terms with our customers, including accelerated progress payment arrangements, as well as exploring alternate funding sources.

At September 30, 2020, we had a cash balance of $3,589,095 compared to $4,052,109 at December 31, 2019. The cash balance as of September 30, 2020 excluded an administratively delayed cash receipt from the U.S. Government of $2.6 million that was received October 5, 2020. Additionally, at September 30, 2020 and December 31, 2019, we had $1,380,684 of restricted cash, which is cash held in escrow pursuant to the WMI acquisition and the determination of a final working capital adjustment. As disclosed elsewhere in this Form 10-K/A, as of December 23, 2020, the Company and Air Industries entered into the Settlement Agreement, which resolves the post-closing working capital adjustment dispute in exchange for the release to the Company of the $1,381,000 cash remaining in escrow. Such amount was released from escrow to the Company on December 28, 2020. The BankUnited Facility contains a minimum liquidity covenant that requires the Company to maintain at all times a minimum amount of $3 million in either unrestricted cash or revolving credit availability or any combination thereof.

We believe that our existing resources as of September 30, 2020, which includes $3.3 million of availability under the BankUnited Facility, will be sufficient to meet our current working capital needs for at least the next 12 months from the date of issuance of our consolidated financial statements.

### Three and Six Months Ended June 30, 2020 (as restated) as Compared to the Three and Six Months Ended June 30, 2019

The following discussion should be read in conjunction with the Company’s consolidated financial statements and notes thereto contained in this report.

### Backlog

We produce custom assemblies pursuant to long-term contracts and customer purchase orders. Funded backlog consists of aggregate funded values under such contracts and purchase orders, excluding the portion previously included in operating revenues pursuant to ASC 606. Unfunded backlog is the estimated amount of future orders under the expected duration of the programs. Substantially all of our backlog is subject to termination at will and rescheduling, without significant penalty. Funds are often appropriated for programs or contracts on a yearly or quarterly basis, even though the contract may call for performance that is expected to take a number of years. Therefore, our funded backlog does not include the full value of our contracts. Our total backlog as of June 30, 2020 and December 31, 2019 was as follows:

| Backlog (Total) | June 30, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Funded | $205,176,000 | $147,647,000 |
| Unfunded | 337,439,000 | 414,231,000 |
| Total | $542,615,000 | $561,878,000 |

Approximately 90% of the total amount of our backlog at June 30, 2020 was attributable to government contracts. Our backlog attributable to government contracts at June 30, 2020 and December 31, 2019 was as follows:

| Backlog (Government) | June 30, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Funded | $201,815,000 | $136,932,000 |
| Unfunded | 285,452,000 | 359,770,000 |
| Total | $487,267,000 | $496,702,000 |

Our backlog attributable to commercial contracts at June 30, 2020 and December 31, 2019 was as follows:

| Backlog (Commercial) | June 30, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Funded | $3,361,000 | $10,715,000 |
| Unfunded | 51,987,000 | 54,461,000 |
| Total | $55,348,000 | $65,176,000 |

The total backlog at June 30, 2020 is primarily comprised of long-term programs with Raytheon (NGJ-MB), Northrop Grumman (E-2D and WOWP), USAF (T-38) and Boeing A-10. Funded backlog is primarily from purchase orders under long-term contracts with Northrop Grumman (E-2D and WOWP), Raytheon (NGJ-MB), Boeing A-10 and HIRRS (Hovering InfraRed Suppression System).

### Results of Operations

### Revenue

Revenue for the three months ended June 30, 2020 was $19,740,767 compared to $20,101,713 (restated) for the same period last year, a decrease of $360,946 or 1.8%. The decrease was primarily related to timing of the Raytheon NGJ-MB program. We had significant revenue in the year-ago period from the first development phase of the Raytheon NGJ-MB program, which was essentially complete by December 31, 2019. There was also a decrease in the G650 program which has been terminated. These revenue decreases were partially offset by an increase in revenue relating to the start of a new multi-year award for the Northrop Grumman E2D program as well as increases related to the T-38 Pacer program and the NGC WOWP program.

Revenue for the six months ended June 30, 2020 was $36,599,154 compared to $42,090,096 (restated) for the same period last year, a decrease of $5,490,942 or 13%. The year to date decrease was driven by the same programs as the quarterly decrease stated above and in addition we had year to date decreases in the Sikorsky fuel panels and WPA programs.

Revenue from government subcontracts was $14,235,552 for the three months ended June 30, 2020 compared to $13,663,551 (restated) for the three months ended June 30, 2019, an increase of $572,001 or 4.2%. The increase in revenue relating to the start of a new multi-year award for the Northrop Grumman E2D program as well as increases related to the NGC WOWP program was offset by a decrease in the Raytheon NGJ-MB program as described above.

Revenue from government subcontracts was $26,941,560 for the six months ended June 30, 2020 compared to $28,413,514 (restated) for the six months ended June 30, 2019, a decrease of $1,471,954 or 5.2%. The decrease was primarily related to the Raytheon NGJ-MB program as described above and the Sikorsky fuel panels and WPA programs offset by increases in the NGC E2D and WOWP programs.

Revenue from direct military contracts was $3,615,343 for the three months ended June 30, 2020 compared to $1,561,504 (restated) for the three months ended June 30, 2019, an increase of $2,053,839 or 131.5%. The increase in revenue is primarily driven by an increase in revenue from the Pacer Classic III program which will vary period to period due to the nature of indefinite delivery indefinite quantity (“IDIQ”) contracts.

Revenue from direct military contracts was $4,169,291 for the six months ended June 30, 2020 compared to $3,987,129 (restated) for the six months ended June 30, 2019, an increase of $182,162 or 4.6%. The increase in revenue is primarily driven by an increase in revenue from the Pacer Classic III program mentioned above offset by a decrease in WMI programs.

Revenue from commercial subcontracts was $1,889,872 for the three months ended June 30, 2020 compared to $4,876,658 (restated) for the three months ended June 30, 2019, a decrease of $2,986,786 or 61.2%. The decrease is primarily the result of lower revenue from the G650 program and lower revenue from the Embraer program.

Revenue from commercial subcontracts was $5,488,303 for the six months ended June 30, 2020 compared to $9,689,453 (restated) for the six months ended June 30, 2019, a decrease of $4,201,150 or 43.4%. The decrease is driven by the same programs as the quarterly decrease mentioned above.

### Cost of Sales

Cost of sales for the three months ended June 30, 2020 and 2019 was $17,924,428 and $17,858,070 (restated), respectively, an increase of $66,358 or 0.4%. This increase is the result of the increase in other cost factors noted below.

Cost of sales for the six months ended June 30, 2020 and 2019 was $34,629,831 and $37,363,038 (restated), respectively, a decrease of $2,733,207 or 7.3%. This decrease is the result of the comparable decrease in revenue and the specific program related factors noted below.

The components of the cost of sales were as follows:

|  | Three months ended June 30, 2020 | June 30, 2019 (restated) | Six months ended June 30, 2020 | June 30, 2019 (restated) |
| --- | ---: | ---: | ---: | ---: |
| Procurement | $11,622,405 | $12,295,771 | $21,878,811 | $25,187,087 |
| Labor | 1,731,273 | 1,929,761 | 3,351,476 | 3,909,520 |
| Factory overhead | 4,880,981 | 4,907,050 | 10,316,180 | 9,923,603 |
| Other costs (credit) | (310,231) | (1,274,512) | (916,636) | (1,657,172) |
| **Cost of sales** | **$17,924,428** | **$17,858,070** | **$34,629,831** | **$37,363,038** |

Procurement for the three months ended June 30, 2020 was $11,622,405 compared to $12,295,771 (restated) for the three months ended June 30, 2019, a decrease of $673,366 or 5.5%. This decrease is primarily the result of a push out of procurement costs based on need dates.

Procurement for the six months ended June 30, 2020 was $21,878,811 compared to $25,187,087 (restated) for the six months ended June 30, 2019, a decrease of $3,308,276 or 13.1%. This decrease is primarily the result of a decrease in procurement related to the Raytheon NGJ-MB program which was essentially complete by December 31, 2019. This decrease was partially offset by an increase in procurement for the E2D and WOWP programs.

Labor costs for the three months ended June 30, 2020 were $1,731,273 compared to $1,929,761 (restated) for the three months ended June 30, 2019, a decrease of $198,488 or 10.3%. The decrease is primarily the result of lower direct labor application due to effects of COVID-19.

Labor costs for the six months ended June 30, 2020 were $3,351,476 compared to $3,909,520 (restated) for the six months ended June 30, 2019, a decrease of $558,044 or 14.3%. The decrease is primarily the result of the absence in 2020 of labor associated with the NGJ pod program, which was very labor intensive, as well as lower labor in the G650 program.

Factory overhead for the three months ended June 30, 2020 was $4,880,981 compared to $4,907,050 (restated) for the three months ended June 30, 2019, a decrease of $26,069 or 0.5%. This decrease is primarily due to a decrease in rent and factory supplies offset by an increase in indirect labor.

Factory overhead for the six months ended June 30, 2020 was $10,316,180 compared to $9,923,603 (restated) for the six months ended June 30, 2019, an increase of $392,577 or 4.0%. This decrease is primarily a result of changes in overhead absorption.

Other costs (credit), net for the three months ended June 30, 2020 were $(310,231) compared to $(1,274,512) (restated) for the three months ended June 30, 2019, a decrease of the credit of $964,281. Other costs (credit) primarily include net changes to ending net inventory values and loss contract reserves.

Other costs (credit), net for the six months ended June 30, 2020 were $(916,636) compared to $(1,657,172) (restated) for the six months ended June 30, 2019, a decrease of the credit of $740,536. This decrease is primarily due to changes to ending net inventory values and loss contract reserves.

### Gross Profit

Gross profit for the three months ended June 30, 2020 was $1,816,339 compared to $2,243,643 (restated) for the three months ended June 30, 2019, a decrease of $427,304 or 19%, primarily the result of unfavorable program mix.

Gross profit for the six months ended June 30, 2020 was $1,969,323 compared to $4,727,058 (restated) for the six months ended June 30, 2019, a decrease of $2,757,735 or 58.3%, primarily driven by lower revenue, unfavorable program mix and additional inventory and loss contract reserves.

### Favorable/Unfavorable Adjustments to Gross Profit (Loss)

During the six months ended June 30, 2020 and 2019, circumstances required that we make changes in estimates to various contracts. Such changes in estimates resulted in changes in total gross profit as follows:

|  | Six months ended June 30, 2020 | June 30, 2019 |
| --- | ---: | ---: |
| Favorable adjustments | $1,268,033 | $1,832,378 |
| Unfavorable adjustments | (2,017,618) | (755,632) |
| Net adjustments | $(749,585) | $1,076,746 |

### Selling, General and Administrative Expenses

Selling, general and administrative expenses for the three months ended June 30, 2020 were $2,815,252 compared to $2,547,762 (restated) for the three months ended June 30, 2019, an increase of $267,490 or 10.5%. This increase was primarily driven by an increase in professional fees related to the restatement.

Selling, general and administrative expenses for the six months ended June 30, 2020 were $5,908,342 compared to $5,453,447 (restated) for the six months ended June 30, 2019, an increase of $454,895 or 8.3%. This increase was driven by an increase in professional fees related to the restatement offset by decreases in WMI moving expenses and salaries.

### Loss Before Provision for Income Taxes

Loss before provision for income taxes for the three months ended June 30, 2020 was $(1,359,039) compared to $(879,531) (restated) for the same period last year, an increase in loss of $479,508 or 54.5%. The decrease in loss was driven by a combination of a decrease in gross profit as a result of unfavorable program mix, an increase in SG&A expenses as a result of increased accounting and legal fees related to the restatement and a decrease in interest expense.

Loss before provision for income taxes for the six months ended June 30, 2020 was $(4,715,816) compared to $(1,812,570) (restated) for the same period last year, an increase in loss of $2,903,246 or 160.2%. The increase in loss is a combination of a decrease in gross profit as a result of lower revenue, unfavorable program mix, additional inventory and loss contract reserves and an increase in SG&A expenses as a result of increased accounting and legal fees related to the restatement and a decrease in interest expense.

### Provision for (Benefit from) Income Taxes

Provision for (benefit from) income taxes was $2,100 for the six months ended June 30, 2020, compared to a provision for (benefit from) income taxes of $3,313 (restated) for the six months ended June 30, 2019. The tax provision relates to state minimum and franchise taxes for the year.

### Net Loss

Net loss for the three months ended June 30, 2020 was $(1,360,561) or $(0.11) per basic share, compared to a loss of $(881,167) (restated) or $(0.07) per basic share, for the same period last year. Diluted loss per share was $(0.11) for the three months ended June 30, 2020 calculated utilizing 11,855,404 weighted average shares outstanding. Diluted loss per share was $(0.07) for the three months ended June 30, 2019 calculated utilizing 11,817,713 weighted average shares outstanding. The increase in net loss was primarily driven by a decrease in gross profit, an increase in SG&A and a decrease in interest expense as described above.

Net loss for the six months ended June 30, 2020 was $(4,717,916) or $(0.40) per basic share, compared to a loss of $(1,815,883) (restated) or $(0.15) per basic share, for the same period last year. Diluted loss per share was $(0.40) for the six months ended June 30, 2020 calculated utilizing 11,846,260 weighted average shares outstanding. Diluted loss per share was $(0.15) for the six months ended June 30, 2019 calculated utilizing 11,776,107 weighted average shares outstanding. The increase in net loss was primarily driven by the decrease in gross profit as a result of lower revenue unfavorable program mix, additional inventory and loss contract reserves as described above.

### Liquidity and Capital Resources

### General

At June 30, 2020, we had working capital of $9,092,724 compared to working capital of $11,551,636 at December 31, 2019, a decrease of $2,458,912 or 21.3%.

### Cash Flow

A large portion of our cash flow is used to pay for materials and processing costs associated with contracts that are in process and which do not provide for progress payments. Costs for which we are not able to bill on a progress basis are components of “Contract assets” on our consolidated balance sheets and represent the aggregate costs and related earnings for uncompleted contracts for which the customer has not yet been billed. These costs and earnings are recovered upon shipment of products and presentation of billings in accordance with contract terms.

Because ASC 606 requires us to use estimates in determining revenue, costs and profits and in assigning the amounts to accounting periods, there can be a significant disparity between earnings (both for accounting and tax purposes) as reported and actual cash that we receive during any reporting period. Accordingly, it is possible that we may have a shortfall in our cash flow and may need to borrow money, or to raise additional capital, until the reported earnings materialize into actual cash receipts.

Several of our programs require us to expend up-front costs that may have to be amortized over a portion of production units. In the case of significant program delays and/or program cancellations, we could be required to bear impairment charges, which may be material for costs that are not recoverable. Such charges and the loss of up-front costs could have a material impact on our liquidity and results of operations.

We continue to work to obtain better payment terms with our customers, including accelerated progress payment arrangements, as well as exploring alternative funding sources.

At June 30, 2020, we had a cash balance of $6,749,201 compared to $4,052,109 at December 31, 2019. Additionally, at June 30, 2020 and December 31, 2019, we had $1,380,684 of restricted cash, which is cash held in escrow pursuant to the WMI acquisition and the determination of a final working capital adjustment. The BankUnited Facility contains a minimum liquidity covenant that requires the Company to maintain at all times a minimum amount of $3 million in either unrestricted cash or revolving credit availability or any combination thereof.

We believe that our existing resources, together with the availability under the BankUnited Facility, will be sufficient to meet our current working capital needs for at least the next 12 months from the date of issuance of our consolidated financial statements.

### Three Months Ended March 31, 2020 (as restated) as Compared to the Three Months Ended March 31, 2019

The following discussion should be read in conjunction with the Company’s consolidated financial statements and notes thereto contained in this report.

### Backlog

We produce custom assemblies pursuant to long-term contracts and customer purchase orders. Funded backlog consists of aggregate funded values under such contracts and purchase orders, excluding the portion previously included in operating revenues pursuant to ASC 606. Unfunded backlog is the estimated amount of future orders under the expected duration of the programs. Substantially all of our backlog is subject to termination at will and rescheduling, without significant penalty. Funds are often appropriated for programs or contracts on a yearly or quarterly basis, even though the contract may call for performance that is expected to take a number of years. Therefore, our funded backlog does not include the full value of our contracts. Our total backlog as of March 31, 2020 and December 31, 2019 was as follows:

| Backlog (Total) | March 31, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Funded | $207,295,000 | $147,647,000 |
| Unfunded | 345,268,000 | 414,231,000 |
| Total | $552,563,000 | $561,878,000 |

Approximately 90% of the total amount of our total backlog at March 31, 2020 was attributable to government contracts. Our backlog attributable to government contracts at March 31, 2020 and December 31, 2019 was as follows:

| Backlog (Government) | March 31, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Funded | $202,611,000 | $136,932,000 |
| Unfunded | 292,714,000 | 359,770,000 |
| Total | $495,325,000 | $496,702,000 |

Our backlog attributable to commercial contracts at March 31, 2020 and December 31, 2019 was as follows:

| Backlog (Commercial) | March 31, 2020 | December 31, 2019 |
| --- | ---: | ---: |
| Funded | $4,684,000 | $10,715,000 |
| Unfunded | 52,554,000 | 54,461,000 |
| Total | $57,238,000 | $65,176,000 |

The total backlog at March 31, 2020 is primarily comprised of long-term programs with Raytheon (NGJ-MB), Northrop Grumman (E-2D and WOWP), Sikorsky (fuel panels), Lockheed Martin (F35), USAF (T-38), Boeing A-10 and Honda (HondaJet). Funded backlog is primarily from purchase orders under long-term contracts with Northrop Grumman (E-2D and WOWP), Raytheon (NGJ-MB), Boeing A-10 and HIRRS (Hovering InfraRed Suppression System) and the USAF (T-38).

### Results of Operations

### Revenue

Revenue for the three months ended March 31, 2020 was $16,858,386 compared to $21,988,384 (restated) for the same period last year, a decrease of $5,129,998 or 23.3%. The decrease was primarily related to timing. We had significant revenue in the year-ago period from the first development phase of the Raytheon NGJ-MB program, which was essentially complete by December 31, 2019. The revenue decrease was partially offset by an increase in revenue relating to the start of a new multi-year award for the Northrop Grumman E2D program.

Revenue from government subcontracts was $12,706,008 for the three months ended March 31, 2020 compared to $14,749,963 (restated) for the three months ended March 31, 2019, a decrease of $2,043,955 or 13.9%. The decrease in revenue is primarily the result of the substantial completion of the Raytheon NGJ-MB program by December 31, 2019, offset by an increase relating to the start of a new multi-year award for the Northrop Grumman E2D program.

Revenue from direct military contracts was $553,948 for the three months ended March 31, 2020 compared to $2,425,626 (restated) for the three months ended March 31, 2019, a decrease of $1,871,678 or 77.2%. The decrease in revenue is primarily driven by a decrease in revenue from the Pacer Classic III program which will vary period to period due to the nature of indefinite delivery indefinite quantity (“IDIQ”) contracts.

Revenue from commercial subcontracts was $3,598,430 for the three months ended March 31, 2020 compared to $4,812,795 (restated) for the three months ended March 31, 2019, a decrease of $1,214,365 or 25.2%. The decrease is primarily the result of lower revenue from Embraer and the HondaJet program, both of which have had rate reductions.

### Cost of Sales

Cost of sales for the three months ended March 31, 2020 and 2019 was $16,705,403 and $19,504,968 (restated), respectively, a decrease of $2,799,565 or 14.4%. This decrease is the result of the comparable decrease in revenue and the specific program related factors noted below.

The components of the cost of sales were as follows:

|  | Three months ended March 31, 2020 | March 31, 2019 (restated) |
| --- | ---: | ---: |
| Procurement | $10,256,406 | $12,891,316 |
| Labor | 1,736,854 | 1,979,759 |
| Factory overhead | 5,435,199 | 5,016,553 |
| Other costs (credits) | (723,056) | (382,660) |
| **Cost of Sales** | **$16,705,403** | **$19,504,968** |

Procurement for the three months ended March 31, 2020 was $10,256,406 compared to $12,891,316 (restated) for the three months ended March 31, 2019, a decrease of $2,634,910 or 20.4%. This decrease is primarily the result of a decrease in procurement related to the Raytheon NGJ-MB development program which was essentially complete by December 31, 2019.

Labor costs for the three months ended March 31, 2020 were $1,736,854 compared to $1,979,759 (restated) for the three months ended March 31, 2019, a decrease of $242,905 or 12.3%. The decrease is primarily the result of the absence in 2020 of labor associated with the NGJ-MB program, which was very labor intensive.

Factory overhead for the three months ended March 31, 2020 was $5,435,199 compared to $5,016,553 (restated) for the three months ended March 31, 2019, an increase of $418,646 or 8.3%. This increase is due to an increase in indirect labor and healthcare costs.

Other costs (credit), net for the three months ended March 31, 2020 were $(723,056) compared to $(382,660) (restated) for the three months ended March 31, 2019, an increase of the credit of $340,396. Other costs / (credits) primarily include net changes to ending net inventory values, loss contract reserves and absorption variances. The change in the three months ended March 31, 2020 is primarily due to growth in inventory and increase in the inventory reserves.

### Gross Profit

Gross profit for the three months ended March 31, 2020 was $152,983 compared to $2,483,416 (restated) for the three months ended March 31, 2019, a decrease of $2,330,433 or 93.8%, primarily the result of lower gross profit on the Raytheon NGJ-MB program due to the program’s substantial completion in December 2019 and unfavorable program mix and increases to the inventory reserve.

### Favorable/Unfavorable Adjustments to Gross Profit (Loss)

During the three months ended March 31, 2020 and 2019, circumstances required that we make changes in estimates to various contracts. Such changes in estimates resulted in decreases in total gross profit as follows:

|  | Three months ended March 31, 2020 | March 31, 2019 |
| --- | ---: | ---: |
| Favorable adjustments | $488,762 | $1,701,213 |
| Unfavorable adjustments | (1,831,566) | (407,576) |
| Net adjustments | $1,342,804 | $1,293,637 |

### Selling, General and Administrative Expenses

Selling, general and administrative expenses for the three months ended March 31, 2020 were $3,093,090 compared to $2,905,686 (restated) for the three months ended March 31, 2019, an increase of $187,404 or 6.4%. This increase was primarily driven by an increase in professional fees.

### Loss Before Provision for Income Taxes

Loss before provision for income taxes for the three months ended March 31, 2020 was $(3,356,777) compared to $(933,039) (restated) for the same period last year, an increase in loss of $2,423,738 or 259.8%. The increase in loss was primarily driven by the decrease in revenue as described above.

### Provision for (benefit from) Income Taxes

Provision for (benefit from) income taxes was $578 for the three months ended March 31, 2020, compared to a provision for income taxes of $1,677 (restated) for the three months ended March 31, 2019. In February 2019, the Company received information that the net operating loss carryback that was generated in 2014 and carried back to 2012-13 was under examination and could possibly be disallowed by the IRS. As of June 2020, the Company has received notification that the returns will be accepted as filed.

### Net Loss

Net loss for the three months ended March 31, 2020 was $(3,357,355) or $(0.29) per basic share, compared to a loss of $(934,716) (restated) or $(0.08) per basic share, for the same period last year. Diluted loss per share was $(0.29) for the three months ended March 31, 2020 calculated utilizing 11,837,014 weighted average shares outstanding. Diluted loss per share was $(0.08) for the three months ended March 31, 2019 calculated utilizing 11,736,305 weighted average shares outstanding. The increase in net loss was primarily driven by the decrease in revenue as described above.

### Liquidity and Capital Resources

### General

At March 31, 2020, we had working capital of $8,148,760 compared to working capital of $11,551,636 at December 31, 2019, a decrease of $3,402,876 or 29.5%.

### Cash Flow

A large portion of our cash flow is used to pay for materials and processing costs associated with contracts that are in process and which do not provide for progress payments. Costs for which we are not able to bill on a progress basis are components of “Contract Assets” on our consolidated balance sheets and represent the aggregate costs and related earnings for uncompleted contracts for which the customer has not yet been billed. These costs and earnings are recovered upon shipment of products and presentation of billings in accordance with contract terms.

Because ASC606 requires us to use estimates in determining revenue, costs and profits and in assigning the amounts to accounting periods, there can be a significant disparity between earnings (both for accounting and tax purposes) as reported and actual cash that we receive during any reporting period. Accordingly, it is possible that we may have a shortfall in our cash flow and may need to borrow money, or to raise additional capital, until the reported earnings materialize into actual cash receipts.

Several of our programs require us to expend up-front costs that may have to be amortized over a portion of production units. In the case of significant program delays and/or program cancellations, we could be required to bear impairment charges, which may be material for costs that are not recoverable. Such charges and the loss of up-front costs could have a material impact on our liquidity and results of operations.

We continue to work to obtain better payment terms with our customers, including accelerated progress payment arrangements, as well as exploring alternative funding sources.

At March 31, 2020, we had a cash balance of $1,998,697 compared to $4,052,109 at December 31, 2019. Additionally, at March 31, 2020 and December 31, 2019, we had $1,380,684 of restricted cash, which is cash held in escrow pursuant to the WMI acquisition and the determination of a final working capital adjustment. The BankUnited Facility contains a minimum liquidity covenant requires the Company to maintain at all times a minimum amount of $3 million in either unrestricted cash or revolving credit availability or any combination thereof.

We believe that our existing resources, together with the availability under the BankUnited Facility, will be sufficient to meet our current working capital needs for at least the next 12 months from the date of issuance of our consolidated financial statements.

## Controls and procedures

As filed, 15,305 characters.

### Evaluation of Disclosure Controls and Procedures

Our management evaluated the effectiveness of our disclosure controls and procedures as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act, as of December 31, 2020. Based on this evaluation of our disclosure controls and procedures, management has concluded that our disclosure controls and procedures were not effective due to the material weaknesses described below which resulted in reporting errors requiring the restatements of our financial statements described in this Comprehensive Form 10-K for the years ended December 31, 2020 and December 31, 2019 and for the quarters ended March 31, 2020, June 30, 2020 and September 30, 2020.

### Management’s Annual Report on Internal Control over Financial Reporting

Management is responsible for establishing and maintaining adequate internal control over financial reporting. Internal control over financial reporting, as defined in Exchange Act Rules 13a-15(f) and 15d-15(f), is a process designed by, or under the supervision of, our principal executive and principal financial officers and effected by our board of directors, management and other personnel, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with U.S. GAAP and includes those policies and procedures that:

- pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of our assets;
- provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with U.S. GAAP, and that our receipts and expenditures are being made only in accordance with authorizations of our management and directors; and
- provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of our assets that could have a material effect on our consolidated financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Management conducted an evaluation of the effectiveness of internal control over financial reporting based on criteria established in *Internal Control- Integrated Framework* (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (“COSO”). Based on this evaluation, management concluded that the Company’s internal control over financial reporting was not effective at the reasonable assurance level as of December 31, 2020 and December 31, 2019 because of the material weakness described below.

A material weakness is a deficiency, or a combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of the Company’s annual or interim consolidated financial statements will not be prevented or detected on a timely basis.

In connection with management’s evaluation of the Company’s internal control over financial reporting described above, management has identified the deficiencies described below that constitute a material weakness in our internal control over financial reporting as of December 31, 2020 and December 31, 2019. One of these deficiencies led to material errors in our previously issued consolidated financial statements, which in turn led to the restatement of those previously issued consolidated financial statements, as described in Part II, Item 8, Note 17 “Restatement of Previously Issued Consolidated Financial Statements” in the notes to the consolidated financial statements included in this Comprehensive Form 10-K/A.

#### Control Environment, Risk Assessment, Control Activities and Monitoring

We did not maintain effective internal control over financial reporting related to control environment, risk assessment, control activities and monitoring:

- There were insufficiently documented Company accounting policies and insufficiently detailed Company procedures to put policies into effective action.
- The design and implementation of internal controls related to cut-off procedures were not sufficient to ensure proper accounting for in-transit items.
- The design and implementation of internal controls related to monitoring and review of inventory costing were not sufficient to ensure proper valuation of appropriately stated inventory costs.
- The design and implementation of internal controls related to the establishment, and monitoring and review, of loss contract and excess and obsolete reserves were not sufficient to ensure proper accounting for the associated reserves.
- The information technology general controls associated with proper change management were not sufficient to ensure the accuracy and adequacy of the resulting changes.
- The design and implementation of internal controls related to preparation and review of financial statements and the related disclosures were not sufficient to ensure the completeness and accuracy of those financial statements and required disclosures.

#### Accounting for Inventory and related IT environment

During the first quarter of 2021, we identified material weaknesses from the month end closing process and INFORXA module used by the Company to maintain the perpetual inventory reporting. The following issues were identified which led to the need to restate the financial results for the twelve months ended December 31, 2020 and December 31, 2019, and the financial results for the three months ended March 31, 2020, June 30, 2020 and September 30, 2020:

- Double Labor and Overhead: The Company’s perpetual inventory system did not work as intended to ensure the correct amount of labor incurred is accounted for in inventory, and it did not include any control or reporting to detect that a reversing transaction in the coding was not occurring, which resulted in duplicate labor applied to inventory. The Company did not have a control in place to adequately review and approve the reasonableness of the entries posted to the general ledger to record differences in cost of goods sold for the differences between general ledger inventory and the perpetual inventory system’s balances.
- Unit of measure: As part of the first quarter 2021 closing process, we identified that that the perpetual inventory included some unit of measure errors which were not detected and corrected within the 2020 general ledger. Units of Measure (“UM”) were not consistent between quantities ordered and quantities received for certain classes of purchased parts. This resulted in overstatements of inventory values due to UM’s not being consistent with unit prices on purchase orders to suppliers. Errors occurred when the need for corrections to unit costs went undetected until a subsequent quarter as a result of (a) only having a detective control in place to scan for apparent UM issues that stand out when our accounting department reviews the month-end perpetual inventory reports, and (b) not having a comprehensive enough list of the commodity codes in the UM conversion tables within the perpetual inventory system.
- Average Cost: The pre-implementation testing that was performed in the test environment on an INFORXA Software Patch that was written and went live into the system in July 2020 did not detect that the system as patched would erroneously omit the reset of one field used by the system in calculating the average cost per unit correctly, thus causing the live system as patched to perform incorrect average cost calculations on some parts.
- Inventory Accrual: The monthly journal entry log used to manage the month end close process did not contain the requirement to determine and post a month end QC01 (inventory received in-house awaiting quality inspection) inventory accrual. An automated accrual for goods received, not yet in inventory does not occur until after the parts have passed QC. Until the parts pass QC, they are in the warehouse location “QC01”. Therefore, the Company needs to record an accrual to increase its purchases of inventory for those goods in QC01 at each balance sheet date since there is no automated accrual performed by the perpetual inventory system.
- Deferral of Under-Absorbed Overhead in the Balance Sheet: The monthly journal entry log used to manage the month end close process did not contain the requirement to determine and post a full absorption adjustment (under/over absorbed overhead deferral into inventory). As such, the company did not have a process to record over or under absorbed overhead at the end of each quarter.
- Loss Contract Reserve for Contracts where Revenue and Costs are Recognized on a Point-in-Time Basis (“Non-POC Contracts”): There was no evaluation of Non-POC Contracts to determine if a loss reserve should be established and maintained for Non-POC Contracts which management has reason to believe may result in losses.
- Excess and Obsolete Inventory Reserve: There was no process for evaluating and recording reserves against inventory for excess and obsolete inventory.

### Remediation efforts underway for the 2020 and First Quarter 2021 Material Weaknesses

During 2021, we have begun to implement new controls designed to remediate the 2020 material weaknesses described above under *Control Environment, Risk Assessment, Control Activities and Monitoring* and *Accounting for Inventory & related IT environment*, such as:

- The recruitment and hiring of a new Chief Financial Officer
- The recruitment and hiring of a new Controller
- Newly designed month-end accruals for in-transit inventory
- Diagnosis, design, testing and implementation of software changes to our perpetual inventory system to correct the Inventory Costing Errors
- The implementation of new operating procedures related to inventory management and costing
- The implementation of new accounting procedures related to ensure sufficient reserves are established and maintained for::
- any anticipated contract losses
- any reductions in the market values of inventory below cost
- any excess or obsolete inventory

Notwithstanding the conclusion by our management that our controls and procedures as of December 31, 2020 and December 31, 2019 were not effective, and notwithstanding the material weaknesses in our internal control over financial reporting described above, management believes that the consolidated financial statements and related financial information included in this Comprehensive Form 10-K/A fairly present in all material respects our financial position, results of operations and cash flows as of and for the dates presented, and for the periods ended on such dates, in conformity with U.S. GAAP.

### Remediation of Previously Reported 2019 Material Weakness

In connection with management’s evaluation of the Company’s internal control over financial reporting described above, management has concluded that the material weaknesses reported in its Annual Report on Form 10-K for the period ended December 31, 2019 had been remediated and that internal controls put in place to prevent future occurrences of these material weaknesses were effective as of December 31, 2020.

During the course of 2020, we have implemented measures to remediate the underlying causes that gave rise to the previously disclosed material weaknesses and material errors. These measures include the Welding Metallurgy operations as they were incorporated into CPI Aero’s operations as of December 31, 2019. As we continue to evaluate and work to improve our internal control over financial reporting, we may take additional measures to further the overall objective to design and operate internal controls that mitigate identified risks and enable an effective system of internal control over external financial reporting.

CPI Aero is a non-accelerated filer for 2020. As such, CPI Aero is not subject to the requirement to have an auditor attestation report on internal control over financial reporting in the Annual Report on Form 10-K and Comprehensive Form 10-K/A filed in 2021 for 2020. Accordingly, based upon its internal testing which is performed by a national public accounting and advisory firm, management believes that as of December 31, 2020, it has successfully remediated the internal control weaknesses which gave rise to the material errors in our prior financial statements.

- **Revenue Recognition Accounting:**

During 2020, Management, with advice from a leading global accounting and advisory firm, reviewed and updated its revenue recognition policies to be compliant with ASC Topic 606. In addition, the Company has updated its procedures and implemented new controls to remediate the identified weakness and to prevent the material error which occurred in prior periods with regards to revenue recognition wherein revenue and associated estimated margins were not constrained to firm orders received. Current procedures and controls now reconcile EAC revenue with firm funded purchase orders received from customers, which constrains revenue to firm funded orders as required by ASC Topic 606. Standardized templates have been developed to assist the evaluation process, based upon the overall updated policies and procedures including daily decision guidelines. Testing has shown that the previously identified Revenue Recognition material weakness has been remediated.

- **Accounting for Significant Non-Routine Complex Transactions:**

The Company has established a policy with regards to accounting for significant, non-routine, complex transactions which states that prior to any future requirement for accounting for significant, non-routine, complex transactions, the Company will engage experienced professionals and outline and execute a set of controls unique to each transaction to ensure that the non-routine complex transaction is recorded in a proper manner. In 2020 there were no non-routine complex transactions but the Company believes the controls and procedures implemented will allow for proper identification and accounting for those transaction.

- **Information Technology General Controls (ITGC):**

For years subsequent to 2019, the Company has implemented an improved 404 compliant ITGC testing program. The Company has identified relevant ITGCs for key financial systems relating to Change Management, Logical Security, Physical Security, and Computer Operations. We have engaged a national public accounting and advisory firm to test the design, implementation and operating effectiveness of the controls.

### Changes in Internal Control Over Financial Reporting

Other than the remediation efforts underway as referred to above, and the First Quarter 2021 Material Weaknesses referred to above, There were no changes in our internal control over financial reporting during the quarter ended December 31, 2020 that materially affected, or are reasonably likely to materially affect, our internal control over financial reporting other than as described above.

Filed Nov 24, 2021.
Source: SEC EDGAR, the filing index for accession 0001387131-21-011529. Last ingested by Listed: Nov 24, 2026, 18:23 ET. No prices; not investment advice.