# Ormat Technologies, Inc.: Form 10-Q for the period ended Mar 31, 2017

- Company: [Ormat Technologies, Inc.](/companies/ora.md) (CIK 1296445)
- Form: 10-Q
- Filed: 2017-05-09
- Accepted by EDGAR: May 9, 2017, 15:03 ET
- Period: 2017-03-31
- Accession: 0001437749-17-008423
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1296445/000143774917008423/ora20170331_10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1296445/000143774917008423/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2017-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2017-01-01 to 2017-03-31 | $189.9m | us-gaap:Revenues |
| Cost of revenue | 3 months, 2017-01-01 to 2017-03-31 | $115.5m | us-gaap:CostOfGoodsAndServicesSold |
| Gross profit | 3 months, 2017-01-01 to 2017-03-31 | $74.4m | us-gaap:GrossProfit |
| Research and development | 3 months, 2017-01-01 to 2017-03-31 | $602.0k | us-gaap:ResearchAndDevelopmentExpense |
| Operating income | 3 months, 2017-01-01 to 2017-03-31 | $59.5m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2017-01-01 to 2017-03-31 | $14.9m | us-gaap:InterestExpense |
| Income tax | 3 months, 2017-01-01 to 2017-03-31 | $10.9m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2017-01-01 to 2017-03-31 | $35.3m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2017-01-01 to 2017-03-31 | $0.70 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2017-01-01 to 2017-03-31 | $0.71 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2017-01-01 to 2017-03-31 | 50,491,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2017-01-01 to 2017-03-31 | $71.5m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Dividends paid | 3 months, 2017-01-01 to 2017-03-31 | $8.4m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2017-03-31 | $174.1m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2017-03-31 | $428.7m | us-gaap:AssetsCurrent |
| Total assets | at 2017-03-31 | $2.50bn | us-gaap:Assets |
| Current liabilities | at 2017-03-31 | $207.5m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2017-03-31 | $1.30bn | us-gaap:Liabilities |
| Short-term borrowings | at 2017-03-31 | $30.0m | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2017-03-31 | $1.11bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 140,803 characters.

### Cautionary Note Regarding Forward-Looking Statements

This quarterly report on Form 10-Q includes “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical facts, included in this quarterly report that address activities, events or developments that we expect or anticipate will or may occur in the future, including such matters as our projections of annual revenues, expenses and debt service coverage with respect to our debt securities, future capital expenditures, business strategy, competitive strengths, goals, development or operation of generation assets, market and industry developments and the growth of our business and operations, are forward-looking statements. When used in this quarterly report on Form 10-Q, the words “may”, “will”, “could”, “should”, “expects”, “plans”, “anticipates”, “believes”, “estimates”, “predicts”, “projects”, “potential”, or “contemplate” or the negative of these terms or other comparable terminology are intended to identify forward-looking statements, although not all forward-looking statements contain such words or expressions. The forward-looking statements in this quarterly report are primarily located in the material set forth under the headings “Management’s Discussion and Analysis of Financial Condition and Results of Operations”, “Risk Factors”, and “Notes to Condensed Consolidated Financial Statements”, but are found in other locations as well. These forward-looking statements generally relate to our plans, objectives and expectations for future operations and are based upon management’s current estimates and projections of future results or trends. Although we believe that our plans and objectives reflected in or suggested by these forward-looking statements are reasonable, we may not achieve these plans or objectives. You should read this quarterly report on Form 10-Q completely and with the understanding that actual future results and developments may be materially different from what we expect due to a number of risks and uncertainties, many of which are beyond our control.

Specific factors that might cause actual results to differ from our expectations include, but are not limited to:

- significant considerations, risks and uncertainties discussed in this quarterly report;
- geothermal resource risk (such as the heat content, useful life and geological formation of the reservoir);
- operating risks, including equipment failures and the amounts and timing of revenues and expenses;
- financial market conditions and the results of financing efforts;
- the impact of fluctuations in oil and natural gas prices and renewable power market penetration on the energy price component under certain of our power purchase agreements (“PPAs”);
- risks and uncertainties with respect to our ability to implement strategic goals or initiatives in segments of the clean energy industry or new or additional geographic focus areas;
- environmental constraints on operations and environmental liabilities arising out of past or present operations, including the risk that we may not have, and in the future may be unable to procure, any necessary permits or other environmental authorizations;
- construction or other project delays or cancellations;
- political, legal, regulatory, governmental, administrative and economic conditions and developments in the United States and other countries in which we operate and, in particular, the impact of recent and future federal, state and local regulatory proceedings and changes, including legislative and regulatory initiatives regarding deregulation and restructuring of the electric utility industry, public policies and government incentives that support renewable energy and enhance the economic feasibility of our projects at the federal and state level in the United States and elsewhere, and carbon-related legislation;
- the enforceability of long-term PPAs for our power plants;
- contract counterparty risk;
- weather and other natural phenomena including earthquakes, volcanic eruption, drought and other natural disasters;
- changes in environmental and other laws and regulations to which our company is subject, as well as changes in the application of existing laws and regulations;
- current and future litigation;
- our ability to successfully identify, integrate and complete acquisitions;
- competition from other geothermal energy projects and new geothermal energy projects developed in the future, and from alternative electricity producing technologies;
- market or business conditions and fluctuations in demand for energy or capacity in the markets in which we operate;
- the direct or indirect impact on our company’s business of various forms of hostilities including the threat or occurrence of war, terrorist incidents or cyber-attacks or responses to such threatened or actual incidents or attacks, including the effect on the availability of and premiums on insurance;
- our new strategic plan to expand our geographic markets, customer base and product and service offerings may not be implemented as currently planned or may not achieve our goals as and when implemented;
- development and construction of solar photovoltaic (“Solar PV”) and energy storage projects, if any, may not materialize as planned;
- the effect of and changes in current and future land use and zoning regulations, residential, commercial and industrial development and urbanization in the areas in which we operate;
- the risk factors set forth in our Annual Report on Form 10-K for the year ended December 31, 2016 and any update contained herein and other risks and uncertainties detailed from time to time in our filings with the Securities and Exchange Commission (“SEC”); and
- other uncertainties which are difficult to predict or beyond our control and the risk that we may incorrectly analyze these risks and forces or that the strategies we develop to address them may be unsuccessful.

Investors are cautioned that these forward-looking statements are inherently uncertain. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results or outcomes may vary materially from those described herein. Other than as required by law, we undertake no obligation to update forward-looking statements even though our situation may change in the future. Given these risks and uncertainties, readers are cautioned not to place undue reliance on such forward-looking statements.

The following discussion and analysis of our financial condition and results of operations should be read together with our condensed consolidated financial statements and related notes included elsewhere in this report and the “Risk Factors” section of our Annual Report on Form 10-K for the year ended December 31, 2016 and any updates contained herein as well as those set forth in our reports and other filings made with the SEC.

### General

### Overview

We are a leading vertically integrated company that is currently primarily engaged in the geothermal and recovered energy power business. With the objective of becoming a leading global provider of renewable energy, we focus on several key initiatives under our new strategic plan, as described below.

We design, develop, build, sell, own, and operate clean, environmentally friendly geothermal and recovered energy-based power plants, usually using equipment that we design and manufacture.

Our geothermal power plants include both power plants that we have built and power plants that we have acquired, while we have built all of our recovered energy-based plants. We currently conduct our business activities in two business segments:

- The Electricity segment — in this segment, we develop, build, own and operate geothermal and recovered energy-based power plants in the United States and geothermal power plants in other countries around the world, and sell the electricity they generate; as well as conduct activity in the demand response and storage markets as described below; and
- The Product segment — in this segment we design, manufacture and sell equipment for geothermal and recovered energy-based electricity generation, and remote power units and provide services relating to the engineering, procurement, construction, operation and maintenance of geothermal and recovered energy-based power plants and in the future, other power generating units such as Solar PV and energy storage.

We recently expanded our operations to include the provision of services in the demand response, energy management and energy storage markets. On March 15, 2017, we completed the acquisition of substantially all of the business and assets of Viridity Energy, Inc. (“VEI”), a Philadelphia-based company with nearly a decade of expertise and leadership in demand response, energy management and storage. The acquired business and assets are owned and operated by our wholly owned subsidiary Viridity Energy Solutions Inc. (“Viridity”). The acquisition enabled us to enter the growing energy storage and demand response markets. We intend to use Viridity to accelerate long-term growth, expand our market presence, and further develop our demand response VPower™ software platform and energy storage services. We plan to continue to provide services and products to existing customers of the acquired business, while expanding into new geographies and targeting a broader potential customer base.

Both our Electricity segment and Product segment operations are conducted in the United States and the rest of the world. Our current generating portfolio includes geothermal power plants in the United States, Guatemala, Kenya and Guadeloupe, as well as recovered energy generation power plants in the United States.

For the three months ended March 31, 2017, our total revenues increased by 25.3% (from $151.6 million to $189.9 million) over the corresponding period in 2016.

For the three months ended March 31, 2017, Electricity segment revenues were $115.8 million, compared to $107.9 million for the three months ended March 31, 2016, an increase of 7.3% from the prior year period. Product segment revenues for the three months ended March 31, 2017 were $74.1 million, compared to $43.7 million during the three months ended March 31, 2016, an increase of 69.5% from the prior year period.

During the three months ended March 31, 2017 and 2016, our consolidated power plants generated 1,427,704 megawatt hours (“MWh”) and 1,396,868 MWh, respectively, an increase of 2.2%.

For the three months ended March 31, 2017, our Electricity segment generated approximately 61.0% of our total revenues, while our Product segment generated approximately 39.0% of our total revenues. For the three months ended March 31, 2016, our Electricity segment generated approximately 71.2% of our total revenues, while our Product segment generated approximately 28.8% of our total revenues.

For the three months ended March 31, 2017, approximately 87.4% of our Electricity segment revenues were derived from PPAs with fixed energy rates which are not affected by fluctuations in energy commodity prices. We have variable price PPAs in California and Hawaii, which provide for payments based on the local utilities’ avoided cost, which is the incremental cost that the power purchaser avoids by not having to generate such electrical energy itself or purchase it from others, as follows:

- the energy rates under the PPAs in California for each of the Ormesa complex, Heber 2 power plant in the Heber complex and the G2 power plant in the Mammoth complex, a total of approximately 90 MW, change primarily based on fluctuations in natural gas prices; and
- the prices paid for electricity pursuant to the 25 MW PPA for the Puna complex in Hawaii change primarily due to variations in the price of oil as well as other commodities.

We recently reduced our economic exposure to fluctuations in the price of oil and natural gas from February 2017 until December 2017, and before that we reduced our economic exposure to fluctuations in the price of natural gas from March 31, 2015 and from June 1, 2015 until December 31, 2015 and from February 3, 2016 until December 29, 2016 by entering into derivatives transactions. For the three months ended March 31, 2017, we recorded a net loss of $0.2 million under Derivatives and foreign currency transaction gains.

To comply with obligations under their respective PPAs, certain of our project subsidiaries are structured as special purpose, bankruptcy remote entities and their assets and liabilities are ring-fenced. Such assets are not generally available to pay our debt, other than debt at the respective project subsidiary level. However, these project subsidiaries are allowed to pay dividends and make distributions of cash flows generated by their assets to us, subject in some cases to restrictions in debt instruments, as described below.

Electricity segment revenues are also subject to seasonal variations and can be affected by higher-than-average ambient temperatures, as described below under “Seasonality”.

Revenues attributable to our Product segment are based on the sale of equipment, engineering, procurement and construction (“EPC”) contracts and the provision of various services to our customers. Product segment revenues may vary from period to period because of the timing of our receipt of purchase orders and the progress of our equipment manufacturing and execution of the relevant project.

Our management assesses the performance of our two operating segments differently. In the case of our Electricity segment, when making decisions about potential acquisitions or the development of new projects, management typically focuses on the internal rate of return of the relevant investment, technical and geological matters and other business considerations. Management evaluates our operating power plants based on revenues, expenses, and EBITDA, and our projects that are under development based on costs attributable to each such project. Management evaluates the performance of our Product segment based on the timely delivery of our products, performance quality of our products, revenues and costs actually incurred to complete customer orders compared to the costs originally budgeted for such orders.

### Recent Developments

The most significant developments in our company and business since January 1, 2017 are described below:

- On May 4, 2017, we announced that ORIX Corporation ("ORIX") will acquire an approximately 22% ownership stake in the Company by purchasing approximately 11 million shares of the Company's common stock from FIMI ENRG Limited Partnership, FIMI ENRG, L.P. (collectively, "FIMI"), Bronicki Investments, Ltd. ("Bronicki"), and senior members of management. The per share sale price to be paid by ORIX at closing (subject to satisfaction of customary conditions, including regulatory approvals) is $57, which was the prevailing market price at the time that ORIX, FIMI and Bronicki reached agreement on the commercial terms of their transaction. Under related agreements, ORIX will have the right to designate three persons to our board of directors, which will be expanded to nine directors, and also propose a fourth person to be mutually agreed by us and ORIX to serve as a new independent director on our board. In addition, for so long as ORIX is entitled to board representation, ORIX will be subject to certain customary standstill restrictions, including an effective 25% cap on its voting rights. ORIX will also have certain customary registration rights with respect to the shares of our common stock that it will own. Under terms of a new Commercial Cooperation Agreement between us and ORIX, we will have exclusive rights to develop, own, operate and provide equipment for ORIX geothermal energy projects in all markets outside of Japan. In addition, we will have certain rights to serve as technical partner and co-invest in ORIX geothermal energy projects in Japan. Also, ORIX will assist us in obtaining project financing for our geothermal energy projects from a variety of leading providers of renewable energy debt financing with which ORIX has relationships in Asia and around the world. We entered into the agreements with ORIX following the unanimous recommendation of a Special Committee of our board of directors that was formed to evaluate and negotiate the shareholder arrangements proposed by ORIX, with independent legal advice from Davis Polk & Wardwell LLP, and following the unanimous approval by our board of directors. We expect closing under the various agreements described above to occur in the third quarter of 2017.
- On March 15, 2017, we announced that we completed the acquisition of substantially all of the business and assets of VEI, a Philadelphia-based company with nearly a decade of expertise and leadership in demand response, energy management and storage. Pursuant to the Asset Purchase Agreement dated as of December 29, 2016, Viridity paid initial consideration of $35.3 million at closing. Additional contingent consideration will be payable in two installments upon the achievement of certain performance milestones measured at the end of fiscal years 2017 and 2020. The acquired business and assets are owned and operated by Viridity. This transaction marks our entry into the growing energy storage and demand response markets, with an established North American presence.
- On March 21, 2017, we announced that the first unit of the Sarulla geothermal power plant, one of the world's largest geothermal power plants, located in Indonesia's North Sumatra, commenced commercial operation. The approximately 110 MW power plant, which combines flash and binary technologies to provide a high efficiency power plant and 100% reinjection of the exploited geothermal fluid, is operated by Sarulla Operations Ltd. We provided the conceptual design of the geothermal combined cycle unit power plant and supplied our Ormat Energy Converter, while Toshiba supplied the geothermal steam turbines and generators for the flash systems.
- In February 2017, we began construction to expand the Olkaria III complex in Kenya by an additional 10 MW and increase the complex's generating capacity to up to 150 MW during 2018.

### Trends and Uncertainties

Different trends, factors and uncertainties may impact our operations and financial condition, including many that we do not or cannot foresee. However, we believe that our results of operations and financial condition for the foreseeable future will be primarily affected by the following trends, factors and uncertainties that are from time to time also subject to market cycles:

- There has been increased demand for energy generated from geothermal and other renewable resources in the U.S. as costs for electricity generated from renewable resources have become more competitive. Much of this is attributable to legislative and regulatory requirements and incentives, such as state renewable portfolio standards (“RPS”) and federal tax credits such as production tax credits (“PTCs”) or investment tax credits (“ITCs”) (which are discussed in more detail in the section entitled “Government Grants and Tax Benefits” below). We believe that future demand for energy generated from geothermal and other renewable resources in the U.S. will be driven mainly by further commitment and implementation of state RPS and greenhouse gas initiatives.
- We accelerated our efforts to expand business development activities in developing countries where geothermal is considered a local resource that can provide a stable and cost effective solution to increase access to power. We expect that a variety of local governmental initiatives will create new opportunities for the development of new projects, as well as create additional markets for our products. These initiatives include the award of long-term contracts to independent power generators, the creation of competitive wholesale markets for selling and trading energy, capacity and related energy products and the adoption of programs designed to encourage “clean” renewable and sustainable energy sources.
- We expect to continue to generate the majority of our revenues from our Electricity segment through the sale of electricity from our power plants. All of our current revenues from the sale of electricity are derived from payments under long-term PPAs related to fully-contracted power plants. We also intend to continue to pursue opportunities, as they arise in our recovered energy business, in the Solar PV sector, in the energy storage market and in other forms of clean energy. In addition, pursuant to our strategic plan, we acquired a business that operates in the demand response and energy storage markets and that generates revenues mainly from software license fees and the provision of services. We are also pursuing PPAs with enterprises that will increase our potential customer base.
- We have adopted a new strategic plan for the growth of our company, in terms of geographic scope, customer base, and technology platforms covered by our product and service offerings, with a focus on increasing net income from operations. Under this plan, we will continue to focus on organic growth and increasing operational efficiency of our existing business lines. In addition, we are actively pursuing acquisition opportunities, both in our existing business lines and the solar power generation and energy storage businesses targeted as part of the plan. Recent acquisitions include our acquisition of the Bouillante geothermal power plant on Guadeloupe Island and our recent acquisition of substantially all of the business and assets of VEI, which we have begun to operate in the demand response and storage markets. We will face a number of challenges and uncertainties in implementing this plan, including integration of recently acquired assets, and we may revise elements of the plan in response to market conditions or other factors as we move forward with the plan.
- In the Electricity segment, we expect intense domestic competition from the solar and wind power generation industries to continue and increase. While we believe the expected demand for renewable energy will be large enough to accommodate increased competition, any such increase in competition, including increasing amounts of renewable energy under contract as well as any further decline in natural gas prices due to increased production which can affect the market price for electricity may contribute to a reduction in electricity prices. However, despite increased competition from the solar and wind power generation industries, we believe that base load electricity, such as geothermal-based energy, will continue to be an important source of renewable energy in areas with commercially viable geothermal resources. Also, we believe that geothermal power plants can positively impact electrical grid stability and provide valuable ancillary services because of their base load nature. In the geothermal industry, due to reduced competition for geothermal leases, we have experienced a decrease in the upfront fee required to secure geothermal leases.
- In the Product segment, we have experienced increased competition from binary power plant equipment suppliers including the major steam turbine manufacturers. While we believe that we have a distinct competitive advantage based on our accumulated experience and current worldwide share of installed binary generation capacity, an increase in competition may impact our ability to secure new purchase orders from potential customers. The increased competition may also lead to further reduction in the prices that we are able to charge for our binary equipment, which in turn may reduce our profitability.
- The 38 MW Puna complex has three PPAs, one of which (the 25 MW PPA) has a monthly variable energy rate based on the local utility’s avoided costs. A decrease in the price of oil as well as in other commodities will result in a decrease in the incremental cost that the power purchaser avoids by not generating its electrical energy needs from oil, which will result in a reduction of the energy rate that we may charge under this PPA. In order to reduce our exposure to oil we signed fixed rate PPAs for the remaining 13 MW.
- The pricing under our PPAs for the Ormesa, Mammoth and Heber complexes for a total of 161 MW were variable rate based on short run avoided cost (“SRAC”) pricing that is impacted by natural gas prices. However, in 2013 and December 2015, we signed new fixed rate PPAs that reduced our current exposure to SRAC by 18 MW and 53 MW, respectively. We also recently we signed a fixed rate PPA that will reduce our exposure beginning in November 2017 by an additional 40 MW. In addition, to further reduce our exposure to natural gas prices, we enter, from time to time, into derivative transactions. In February 2016, we sold call options for total proceeds of $1.9 million at a fixed price of $2.00 per MMbtu to reduce our exposure to SRAC in the period from February 3, 2016 until December 29, 2016. In January 2017 we acquired put options at a strike price of $3 to hedge our exposure to decreasing natural gas prices to below $3 per MMbtu.
- The amounts that we are paid under our PPAs for electricity, capacity and other energy attributes vary for a number of reasons, including:
- market conditions when the PPA is signed;
- the competitive environment in the power market where the plant is located and the power and other energy attributes are sold; and
- in the case of contracts described in the prior bullets with variable pricing components, current oil and natural gas prices.

|  |  |
| --- | --- |
|  | This means, among other things, that the average price per MWh, which is one of the metrics some investors may use to evaluate power plant revenues can fluctuate from period to period. Based on total Electricity segment revenues, we earned, on average, $81.1 and $77.2 per MWh in the three months ended March 31, 2017 and 2016, respectively. Oil and natural gas prices, together with other factors that affect our Electricity segment revenues, could cause changes in our average rate per MWh in the future. |
| ● | The viability of a geothermal resource depends on various factors such as the resource temperature, the permeability of the resource (i.e., the ability to get geothermal fluids to the surface) and operational factors relating to the extraction and injection of the geothermal fluids. Such factors, together with the possibility that we may fail to find commercially viable geothermal resources in the future, represent significant uncertainties that we face in connection with our growth expectations. |

- As our power plants (including their respective well fields) age, they may require increased maintenance with a resulting decrease in their availability, potentially leading to the imposition of penalties if we are not able to meet the requirements under our PPAs as a result of any decrease in availability.
- Our foreign operations are subject to significant political, economic and financial risks which vary by country as well as hostilities that may arise in the countries we operate. As of the date of this report, those risks include security conditions in Israel, the partial privatization of the electricity sector in Guatemala and the political uncertainty currently prevailing in some of the countries in which we operate as further described in the “Risk Factors” section of our Annual Report on Form 10-K for the year ended December 31, 2016. Although we maintain among other things political risk insurance for most of our investments in foreign power plants to mitigate these risks, insurance does not provide complete coverage with respect to all such risks.
- The 330 MW Sarulla project was released for construction, and we began to recognize our first Product segment revenues under the supply contract we signed with the EPC contractor in the quarter ended September 30, 2014. In addition, due to the recent commencement of operation of the first phase of the project, we expect to generate income from our 12.75% equity investment in the Sarulla consortium. The Sarulla project’s future operations may be impacted by the status of development, various factors which we do not control given our minority position in the consortium, as well as other factors described in the “Risk Factors” section of our Annual Report on Form 10-K for the year ended December 31, 2016.
- While we do not see any immediate impact from the failed coup in Turkey and the recent vote for the constitutional amendment bill on our business and operations, we are monitoring any change in the political environment that may affect our future business and operations in the country. As a major equipment supplier in the Turkish geothermal market, we are involved in a number of projects that are currently under construction and plan to continue our marketing efforts to secure new contracts. Our revenue exposure to the Turkish market is increasing and we expect higher exposure in 2017, as we signed a significant number of new contracts in Turkey.
- A Turkish sub-contractor provides us with certain local equipment for renewable energy based generating facilities to help us meet our obligations under certain supply agreements in Turkey. The use of local equipment in renewable energy based generating facilities in Turkey entitles such facilities to certain benefits under Turkish law, provided such facilities have obtained an RER Certificate from EMRA, which requires the issuance of a local certificate. If we do not obtain the local certificate, then some of our customers under the relevant supply agreements in Turkey may not be issued an RER Certificate based on the equipment we supply to them, and we will be required to make a payment to such customers equal to the amount of the expected lost benefit. In order to assure these benefits and maintain our competetive advantage, we own an assembly shop to meet the Turkish requirements.
- FERC is allowed under PURPA to terminate, upon the request of a utility, the obligation of the utility to purchase the output of a Qualifying Facility if FERC finds that there is an accessible competitive market for energy and capacity from the Qualifying Facility. FERC has granted the California investor owned utilities a waiver of the mandatory purchase obligations from Qualifying Facilities above 20 MW. If the utilities in the regions in which our domestic power plants operate were to be relieved of the mandatory purchase obligation, they would not be required to purchase energy from us upon termination of the existing PPA, which could have an adverse effect on our revenues.
- The current administration has expressed skepticism regarding climate change. The final outcome of this administration’s policies and efforts regarding climate change and resulting effects to the geothermal industry remain uncertain.

### Revenues

We generate our revenues from the sale of electricity from our geothermal and recovered energy-based power plants; the design, manufacture and sale of equipment for electricity generation; and the construction, installation and engineering of power plant equipment.

Revenues attributable to our Electricity segment are derived from the sale of electricity from our power plants pursuant to long-term PPAs. While approximately 87.4% of our Electricity revenues for the three months ended March 31, 2017 were derived from PPAs with fixed price components, we have variable price PPAs in California and Hawaii. Our SO#4 PPAs totaling approximately 90 MWs in California are subject to the impact of fluctuations in natural gas prices whereas the prices paid for electricity pursuant to the 25 MW PPA for the Puna complex in Hawaii is impacted by the price of oil as well as other commodities. Accordingly, our revenues from those power plants may fluctuate.

Our Electricity segment revenues are also subject to seasonal variations, as more fully described in “Seasonality” below.

Our PPAs generally provide for energy payments alone, or energy and capacity payments. Generally, capacity payments are payments calculated based on the amount of time that our power plants are available to generate electricity. Some of our PPAs provide for bonus payments in the event that we are able to exceed certain target capacity levels and the potential forfeiture of payments if we fail to meet certain minimum target capacity levels. Energy payments, on the other hand, are payments calculated based on the amount of electrical energy delivered to the relevant power purchaser at a designated delivery point. The rates applicable to such payments are either fixed (subject, in certain cases, to certain adjustments) or are based on the relevant power purchaser’s avoided costs. Our more recent PPAs generally provide for energy payments alone with an obligation to compensate the off-taker for its incremental costs as a result of shortfalls in our supply.

Revenues attributable to our Product segment fluctuate between periods, mainly based on our ability to receive customer orders, the status and timing of such orders, delivery of raw materials and the completion of manufacturing. Larger customer orders for our products are typically the result of our sales efforts, our participation in, and winning of, tenders or requests for proposals issued by potential customers in connection with projects they are developing as well as returning customers. Such projects often take a significant amount of time to design and develop and are subject to various contingencies, such as the customer’s ability to raise the necessary financing for a project. Consequently, we are generally unable to predict the timing of such orders for our products and may not be able to replace existing orders that we have completed with new ones. As a result, revenues from our Product segment fluctuate (sometimes, extensively) from period to period.

The following table sets forth a breakdown of our revenues for the periods indicated:

| Revenues: | Revenue (dollars in thousands) Three Months Ended March 31, 2017 | 2016 | % of Revenue for Period Indicated Three Months Ended March 31, 2017 | 2016 |
| --- | ---: | ---: | ---: | ---: |
| Electricity | $115,776 | $107,868 | 61.0% | 71.2% |
| Product | 74,122 | 43,726 | 39.0 | 28.8 |
| Total | $189,898 | $151,594 | 100% | 100% |

29

The following table sets forth the geographic breakdown of the revenues attributable to our Electricity and Product segments for the periods indicated:

| Electricity Segment: | Revenue (dollars in thousands) Three Months Ended March 31, 2017 | 2016 | % of Revenue for Period Indicated Three Months Ended March 31, 2017 | 2016 |
| --- | ---: | ---: | ---: | ---: |
| United States | $75,896 | $73,807 | 65.6% | 68.4% |
| Foreign | 39,880 | 34,061 | 34.4 | 31.6 |
| Total | $115,776 | $107,868 | 100% | 100% |
| Product Segment: |  |  |  |  |
| United States | $675 | $5,815 | 0.9% | 13.3% |
| Foreign | 73,447 | 37,911 | 99.1 | 86.7 |
| Total | $74,122 | $43,726 | 100% | 100% |

The contribution of our domestic and foreign operations within our Electricity segment and Product segment to combined pre-tax income differ in a number of ways.

*Electricity Segment.* Our Electricity segment domestic revenues were approximately 90% and 117% higher than our Electricity segment foreign revenues for the three months ended March 31, 2017 and 2016, respectively. However, domestic operations in our Electricity segment have higher costs of revenues and expenses than the foreign operations in our Electricity segment. Our foreign power plants are located in lower-cost regions, like Kenya, Guatemala and Guadeloupe, which favorably impact payroll and maintenance expenses among other items. They are also newer than most of our domestic power plants and therefore tend to have lower maintenance costs and higher availability factors than our domestic power plants.

*Product Segment.* Our Product segment foreign revenues were approximately 99% and 87% of our total Product segment revenues for the three months ended March 31, 2017 and 2016. Our Product segment foreign activity also benefits from lower costs of revenues and expenses than Product segment domestic activity such as labor and transportation costs. Accordingly, our Product segment foreign activity contributes more than our Product segment domestic activity to our pre-tax income from operations.

*Relative Contributions.* While our combined (domestic and foreign) Electricity segment revenues exceeded our combined Product segment revenues by approximately $42 million and $64 million, respectively, for the three months ended March 31, 2017 and 2016 (primarily foreign) Product segment revenues resulted in higher pre-tax income from foreign operations for both of those periods.

### Seasonality

The prices paid for the electricity generated by some of our domestic power plants pursuant to our PPAs are subject to seasonal variations. The prices (mainly for capacity) paid for electricity under the PPAs with Southern California Edison and Pacific Gas & Electric in California for the Heber 2 power plant in the Heber complex, the Mammoth complex, the Ormesa complex, and the North Brawley power plant are higher in the months of June through September. As a result, we receive, and expect to continue to receive in the future, higher revenues from these power plants and complexes during such months. In the winter, our power plants produce more energy principally due to the lower ambient temperature, which has a favorable impact on the energy component of our Electricity revenues. The higher payments payable by Southern California Edison and Pacific Gas & Electric Company in the summer months offset the negative impact on our revenues from lower generation in the summer due to the higher ambient temperature.

### Breakdown of Cost of Revenues

#### Electricity Segment

The principal cost of revenues attributable to our operating power plants includes operation and maintenance expenses comprised of salaries and related employee benefits, equipment expenses, costs of parts and chemicals, costs related to third-party services, lease expenses, royalties, startup and auxiliary electricity purchases, property taxes, insurance and, for some of our projects, purchases of make-up water for use in our cooling towers and also depreciation and amortization. In our California power plants, our principal cost of revenues also includes transmission charges and scheduling charges. In some of our Nevada power plants, we also incur transmission and wheeling charges. Some of these expenses, such as parts, third-party services and major maintenance, are not incurred on a regular basis. This results in fluctuations in our expenses and our results of operations for individual power plants from quarter to quarter. Payments made to government agencies and private entities on account of site leases where plants are located are included in cost of revenues. Royalty payments, included in cost of revenues, are made as compensation for the right to use certain geothermal resources and are paid as a percentage of the revenues derived from the associated geothermal rights. Royalties constituted approximately 3.9% and 4.3% of Electricity segment revenues for the three months ended March 31, 2017 and March 31, 2016, respectively.

#### Product Segment

The principal cost of revenues attributable to our Product segment includes materials, salaries and related employee benefits, expenses related to subcontracting activities, and transportation expenses. Sales commissions to sales representatives are included in selling and marketing expenses. Some of the principal expenses attributable to our Product segment, such as a portion of the costs related to labor, utilities and other support services are fixed, while others, such as materials, construction, transportation and sales commissions, are variable and may fluctuate significantly depending on market conditions. As a result, the cost of revenues attributable to our Product segment, expressed as a percentage of total revenues, fluctuates. Another reason for such fluctuation is that in responding to bids for our products, we price our products and services in relation to existing competition and other prevailing market conditions, which may vary substantially from order to order.

### Cash and Cash Equivalents

Our cash and cash equivalents decreased to $174.1 million as of March 31, 2017 from $230.2 million as of December 31, 2016. This decrease was principally due to: (i) our use of $52.9 million to fund capital expenditures; (ii) $35.3 million net cash paid for the acquisition of substantially all the business and assets of VEI; (iii) a net change in in restricted cash and cash equivalents of $25.6 million; (iv) an unconsolidated investment in Sarulla of $14.9 million; (v) net repayment of $13.4 million of long-term debt; (vi) $6.8 million cash paid to non-controlling interests; and (vii) a $8.4 million cash dividend paid. This decrease was partially offset by: (i) $71.5 million derived from operating activities during the three months ended March 31, 2017; and (ii) net proceeds of $30.0 million from our revolving credit lines with commercial banks. Our corporate borrowing capacity under committed lines of credit with different commercial banks as of March 31, 2017 was $524.8 million, as described below in “Liquidity and Capital Resources”. As of March 31, 2017, we have utilized $350.6 million of our corporate borrowing capacity.

### Critical Accounting Estimates and Assumptions

A comprehensive discussion of our critical accounting estimates and assumptions is included in the “Management’s Discussion and Analysis of Financial Condition and Results of Operations” section in our Annual Report on Form 10-K for the year ended December 31, 2016.

### New Accounting Pronouncements

See Note 2 to our condensed consolidated financial statements set forth in Item 1 of this quarterly report for information regarding new accounting pronouncements.

### Results of Operations

Our historical operating results in dollars and as a percentage of total revenues are presented below. A comparison of the different periods described below may be of limited utility primarily as a result of (i) our recent construction or disposition of new power plants and enhancement of acquired power plants; and (ii) fluctuation in revenues from our Product segment.

*(Dollars in thousands, except per share data)*

| Statements of Operations Historical Data: Revenues: | Three Months Ended March 31, 2017 | 2016 |
| --- | ---: | ---: |
| Electricity | $115,776 | $107,868 |
| Product | 74,122 | 43,726 |
|  | 189,898 | 151,594 |
| **Cost of revenues:** |  |  |
| Electricity | 66,036 | 63,686 |
| Product | 49,452 | 24,035 |
|  | 115,488 | 87,721 |
| **Gross profit** |  |  |
| Electricity | 49,740 | 44,182 |
| Product | 24,670 | 19,691 |
|  | 74,410 | 63,873 |
| **Operating expenses:** |  |  |
| Research and development expenses | 602 | 349 |
| Selling and marketing expenses | 4,363 | 3,675 |
| General and administrative expenses | 9,949 | 8,749 |
| Write-off of unsuccessful exploration activities | — | 557 |
| Operating income | 59,496 | 50,543 |
| **Other income (expense):** |  |  |
| Interest income | 244 | 320 |
| Interest expense, net | (14,923) | (16,023) |
| Derivatives and foreign currency transaction gains (losses) | 1,338 | 1,962 |
| Income attributable to sale of tax benefits | 6,157 | 4,398 |
| Other non-operating income (expense), net | (92) | 191 |
| Income from continuing operations before income taxes and equity in losses of investees | 52,220 | 41,391 |
| Income tax (provision) benefit | (10,886) | (9,509) |
| Equity in losses of investees, net | (1,599) | (937) |
| Net income | 39,735 | 30,945 |
| Net income attributable to noncontrolling interest | (4,423) | (1,674) |
| Net income attributable to the Company's stockholders | $35,312 | $29,271 |
| Earnings per share attributable to the Company's stockholders: |  |  |
| Basic: |  |  |
| Net income | $0.71 | $0.60 |
| Diluted: |  |  |
| Net income | $0.70 | $0.59 |
| Weighted average number of shares used in computation of earnings per share attributable to the Company's stockholders: |  |  |
| Basic | 49,680 | 49,173 |
| Diluted | 50,491 | 49,782 |

32

| Statements of Operations Data: Revenues: | Three Months Ended March 31, 2017 | 2016 |
| --- | ---: | ---: |
| Electricity | 61.0% | 71.2% |
| Product | 39.0 | 28.8 |
|  | 100.0 | 100.0 |
| **Cost of revenues:** |  |  |
| Electricity | 57.0 | 59.0 |
| Product | 66.7 | 55.0 |
|  | 60.8 | 57.9 |
| **Gross profit** |  |  |
| Electricity | 43.0 | 41.0 |
| Product | 33.3 | 45.0 |
|  | 39.2 | 42.1 |
| **Operating expenses:** |  |  |
| Research and development expenses | 0.3 | 0.2 |
| Selling and marketing expenses | 2.3 | 2.4 |
| General and administrative expenses | 5.2 | 5.8 |
| Write-off of unsuccessful exploration activities | 0.0 | 0.4 |
| Operating income | 31.3 | 33.3 |
| **Other income (expense):** |  |  |
| Interest income | 0.1 | 0.2 |
| Interest expense, net | (7.9) | (10.6) |
| Derivatives and foreign currency transaction gains (losses) | 0.7 | 1.3 |
| Income attributable to sale of tax benefits | 3.2 | 2.9 |
| Other non-operating income (expense), net | (0.0) | 0.1 |
| and equity in losses of investees | 27.5 | 27.3 |
| Income tax provision | (5.7) | (6.3) |
| Equity in losses of investees, net | (0.8) | (0.6) |
| Net income | 20.9 | 20.4 |
| Net income attributable to noncontrolling interest | (2.3) | (1.1) |
| Net income attributable to the Company's stockholders | 18.6% | 19.3% |

33

### Comparison of the Three Months Ended March 31, 2017 and the Three Months Ended March 31, 2016

### Total Revenues

Total revenues for the three months ended March 31, 2017 were $189.9 million, compared to $151.6 million for the three months ended March 31, 2016, which represented a 25.3% increase from the prior year period. This increase was attributable to both our Electricity and Product segments, in which revenues increased by 7.3% and 69.5%, respectively, compared to the corresponding period in 2016.

#### Electricity Segment

Revenues attributable to our Electricity segment for the three months ended March 31, 2017 were $115.8 million, compared to $107.9 million for the three months ended March 31, 2016, representing a 7.3% increase from the prior period. This increase was primarily attributable to: (i) the consolidation of our Bouillante power plant in Guadeloupe, effective July 5, 2016, with revenues of $5.4 million for the three months ended March 31, 2017; and (ii) an increase in generation at our Puna power plant due to successful improvement of the resource performance.

Power generation in our power plants increased by 2.2% from 1,396,868 MWh in the three months ended March 31, 2016 to 1,427,704 MWh in the three months ended March 31, 2017 mainly due to the increase in generation at our Puna power plant due to higher performance and the consolidation of our Bouillante power plant, effective July 5, 2016, as discussed above.

#### Product Segment

Revenues attributable to our Product segment for the three months ended March 31, 2017 were $74.1 million, compared to $43.7 million for the three months ended March 31, 2016, which represented a 69.5% increase. The increase in our Product segment revenues was primarily due to the start of revenue recognition from two new geothermal projects in New Zealand and China that we started to construct in the first quarter of 2017. We recognized approximately $14.2 million and $21.5 million in revenues, respectively, from these projects in the three months ended March 31, 2017. The total contract prices for the projects are $36.6 million and $23.3 million, respectively, and they are scheduled to be completed by mid-2017 and the end of 2017, respectively. The increase in our Product segment revenues was also attributable to the start of approximately $17.0 million in revenue recognition from our new projects in Turkey, partially offset by other projects in Turkey, which were completed in the year ended December 31, 2016. The increase was also partially offset by a decrease in revenues from our geothermal project in Chile, which is close to completion, and due to timing of revenue recognition and a different product mix.

### Total Cost of Revenues

Total cost of revenues for the three months ended March 31, 2017 was $115.5 million, compared to $87.7 million for the three months ended March 31, 2016, which represented a 31.7% increase. This increase was due to an increase in cost of revenues from both our Electricity and Product segments. As a percentage of total revenues, our total cost of revenues for the three months ended March 31, 2017 increased to 60.8% from 57.9% for the three months ended March 31, 2016. This increase was attributable to an increase in cost of revenues as a percentage of total revenues in our Product segment.

#### Electricity Segment

Total cost of revenues attributable to our Electricity segment for the three months ended March 31, 2017 was $66.0 million, compared to $63.7 million for the three months ended March 31, 2016, which represented a 3.7% increase from the prior period. This slight increase was primarily due to additional cost of revenues from the consolidation of our Bouillante power plant, effective July 5, 2016. As a percentage of total Electricity revenues, our total cost of revenues attributable to our Electricity segment for the three months ended March 31, 2017 was 57.0%, compared to 59.0% for the three months ended March 31, 2016. This decrease was primarily due to higher efficiency in some of our operating power plants.

#### Product Segment

Total cost of revenues attributable to our Product segment for the three months ended March 31, 2017 was $49.5 million, compared to $24.0 million for the three months ended March 31, 2016, which represented a 105.7% increase. This increase was primarily attributable to the increase in Product segment revenues, as discussed above. As a percentage of total Product segment revenues, our total cost of revenues attributable to our Product segment for the three months ended March 31, 2017 was 66.7%, compared to 55.0% for the three months ended March 31, 2016. This increase was mainly attributable to additional costs associated with our project in Chile, as well as a different product mix and different margins in the various sales contracts we entered into for the Product segment during these periods.

### Research and Development Expenses, Net

Research and development expenses for the three months ended March 31, 2017 were $0.6 million, compared to $0.3 million for the three months ended March 31, 2016.

### Selling and Marketing Expenses

Selling and marketing expenses for the three months ended March 31, 2017 were $4.4 million compared to $3.7 million for the three months ended March 31, 2016. This increase was primarily attributable to an increase in sales commissions related to our Product segment. Selling and marketing expenses for the three months ended March 31, 2017 constituted 2.3% of total revenues for such period, compared to 2.4% for the three months ended March 31, 2016.

### General and Administrative Expenses

General and administrative expenses for the three months ended March 31, 2017 were $9.9 million, compared to $8.7 million for the three months ended March 31, 2016. The increase was mainly due to costs associated with our acquisition activities. General and administrative expenses for the three months ended March 31, 2017, constituted 5.2% of total revenues for such period, compared to 5.8% for the three months ended March 31, 2016.

### Operating Income

Operating income for the three months ended March 31, 2017 was $59.5 million, compared to $50.5 million for the three months ended March 31, 2016, which represented a 17.7% increase. The increase in operating income was principally attributable to the increase in our gross margin in both our Electricity and Product segments primarily due to the increase in revenues, as discussed above. Operating income attributable to our Electricity segment for the three months ended March 31, 2017 was $40.9 million, compared to $34.8 million for the three months ended March 31, 2016. Operating income attributable to our Product segment for the three months ended March 31, 2017 was $18.6 million, compared to $15.8 million for the three months ended March 31, 2016.

### Interest Expense, Net

Interest expense, net for the three months ended March 31, 2017 was $14.9 million, compared to $16.0 million for the three months ended March 31, 2016. This decrease was primarily due to: (i) the repayment, in September 2016, of $250 million of our senior unsecured bonds which bore interest at a fixed rate of 7% per annum, through the issuance of $67 million and $137 million, respectively, of two new series of senior unsecured bonds, which bear interest at an interest rate of 3.7% and 4.45%, respectively; (ii) lower interest expense as a result of principal payments of long term debt and revolving credit lines with banks; and (iii) a $0.8 million increase related to interest capitalized to projects, partially offset by an increase in interest related to the sale of tax benefits in connection with the Opal transaction described below.

### Derivatives and foreign Currency Transaction gains

Derivatives and foreign currency transaction gains for the three months ended March 31, 2017 were $1.3 million, compared to $2.0 million for the three months ended March 31, 2016. Derivatives and foreign currency transaction gains for the three months ended March 31, 2017 and 2016 were attributable primarily to gains from foreign currency forward contracts which were not accounted for as hedge transactions.

### Income Attributable to Sale of Tax Benefits

Income attributable to the sale of tax benefits to institutional equity investors (as described below under “OPC Transaction”, “ORTP Transaction” and “Opal Transaction”) for the three months ended March 31, 2017 was $6.2 million, compared to $4.4 million for the three months ended March 31, 2016. This income primarily represents the value of PTCs and taxable income or loss generated by Opal Geo (as defined below) and ORTP and allocated to the investors in the three months ended March 31, 2017 compared to the value of PTCs and taxable income or loss generated by ORTP and OPC and allocated to the investors in the three months ended March 31, 2016.

### Income Taxes

Income tax provision for the three months ended March 31, 2017 was $10.9 million, compared to $9.5 million for the three months ended March 31, 2016. Our effective tax rate for the three months ended March 31, 2017 and March 31, 2016, was 20.8% and 23%, respectively. Our effective tax rate is principally based upon the composition of our income in different countries and changes related to valuation allowances for certain countries. Our aggregate effective tax rate for the three months ended March 31, 2017 is lower than the 35% U.S. federal statutory tax rate as a substantial portion of our income is derived in Israel and taxed at the corporate tax rate of 16%, partially offset by taxes on earnings in Kenya which are taxed at a statutory rate of 37.5%. There is no impact on the Company’s income tax expense (benefit) related to U.S. earnings (losses) due to the offsetting impact on the provision related to the change in the valuation allowance on the Company’s U.S. net deferred tax asset position.

### Equity in losses of investees, net

Equity in losses of investees, net for the three months ended March 31, 2017 was $1.6 million, compared to $0.9 million for the three months ended March 31, 2016. Equity in losses of investees, net are derived from our 12.75% share in the losses of the Sarulla project and from profits elimination.

### Net Income

Net income for the three months ended March 31, 2017 was $39.7 million, compared to $30.9 million for the three months ended March 31, 2016, which represents an increase of $8.8 million. This increase in net income was principally attributable to the increase in operating income of $8.9 million, an increase of $1.8 million in income attributable to the sale of tax benefits, and a $1.1 million decrease in interest expense, net, all as discussed above.

### Net Income attributable to the Company’s Stockholders

Net income attributable to the Company’s stockholders for the three months ended March 31, 2017 was $35.3 million, compared to $29.3 million for the three months ended March 31, 2016, which represents an increase of $6.0 million. This increase in net income attributable to the Company’s stockholders was principally attributable to the increase in net income of $8.8 million as discussed above, partially offset by an increase of $2.7 million in net income attributable to noncontrolling interest mainly due to the closing of a follow-up sale of a 36.75% equity interest in the second phase of the Don A. Campbell power plant to Northleaf Geothermal Holdings, LLC ("Northleaf") in November 2016.

### Liquidity and Capital Resources

Our principal sources of liquidity have been derived from cash flows from operations, proceeds from third party debt in the form of borrowings under credit facilities and private offerings, issuances of notes, project financings, tax monetization transactions, short term borrowing under our lines of credit, and sales of membership interests in one or more of our projects. We have utilized this cash to develop and construct power plants, fund our acquisitions, pay down existing outstanding indebtedness, and meet our other cash and liquidity needs.

As of March 31, 2017, we had access to (i) $174.1 million in cash and cash equivalents of which $158.1 million is held by our foreign subsidiaries; and (ii) $132.6 million of unused corporate borrowing capacity under existing lines of credit with different commercial banks.

Our estimated capital needs for the remainder of 2017 include approximately $212.0 million for capital expenditures on new projects under development or construction, exploration activity, and operating projects, as well as $52.6 million for debt repayment.

We expect to finance these requirements with: (i) the sources of liquidity described above; (ii) positive cash flows from our operations; and (iii) future project financings and refinancings (including construction loans). Management believes that, based on the current stage of implementation of the new strategic plan, the sources of liquidity and capital resources described above will address our anticipated liquidity, capital expenditures, and other investment requirements.

We believe that, based on our plans to increase our operations outside of the U.S., the cash generated from our operations outside of the U.S. will be reinvested outside of the U.S. In addition, our U.S. sources of cash and liquidity are sufficient to meet our needs in the U.S. and, accordingly, we do not currently plan to repatriate the funds we have designated as being permanently invested outside the U.S. If we change our plans, we may be required to accrue and pay U.S. taxes to repatriate these funds.

### Third-Party Debt

Our third-party debt is composed of two principal categories. The first category consists of project finance debt or acquisition financing that we or our subsidiaries have incurred for the purpose of developing and constructing, refinancing or acquiring our various projects, which are described below under “Non-Recourse and Limited-Recourse Third-Party Debt”. The second category consists of debt incurred by us or our subsidiaries for general corporate purposes, which are described below under “Full-Recourse Third-Party Debt.”

### Non-Recourse and Limited-Recourse Third-Party Debt

#### OFC Senior Secured Notes — Non-Recourse

In February 2004, OFC, one of our subsidiaries, issued $190.0 million of OFC Senior Secured Notes for the purpose of refinancing the acquisition cost of the Brady, Ormesa and Steamboat 1, 1A, 2 and 3 power plants, and the financing of the acquisition cost of 50% of the Mammoth complex. The OFC Senior Secured Notes have a final maturity date of December 30, 2020. Principal and interest on the OFC Senior Secured Notes are payable semi-annually. The OFC Senior Secured Notes are collateralized by substantially all of the assets of OFC and those of its wholly owned subsidiaries and are fully and unconditionally guaranteed by all of the wholly owned subsidiaries of OFC. There are various restrictive covenants under the OFC Senior Secured Notes, which include limitations on additional indebtedness of OFC and its wholly owned subsidiaries. Failure to comply with these and other covenants will, subject to customary cure rights, constitute an event of default by OFC. In addition, there are restrictions on the ability of OFC to make distributions to its shareholders, which include a required historical and projected 12-month debt service coverage ratio of not less than 1.25 (measured semi-annually as of June 30 and December 31 of each year). If OFC fails to comply with the debt service coverage ratio, it will be prohibited from making distributions to its shareholders. We are only required to measure these covenants on a semi-annual basis and as of December 31, 2016 (the last measurement date of the covenants) the actual historical 12-month debt service coverage ratio was 1.25 and the pro-forma 12-month debt service coverage ratio was 1.38 (on a semi-annual basis and as of December 31, 2016). There was $17.0 million aggregate principal amount of OFC Senior Secured Notes outstanding as of March 31, 2017.

#### OrCal Geothermal Senior Secured Notes — Non-Recourse

In December 2005, OrCal, one of our subsidiaries, issued $165.0 million of OrCal Senior Secured Notes for the purpose of refinancing the acquisition cost of the Heber complex. The OrCal Senior Secured Notes have been rated BBB- by Fitch Ratings. The OrCal Senior Secured Notes have a final maturity date of December 30, 2020. Principal and interest on the OrCal Senior Secured Notes are payable semi-annually. The OrCal Senior Secured Notes are collateralized by substantially all of the assets of OrCal and those of its wholly owned subsidiaries and are fully and unconditionally guaranteed by all of the wholly owned subsidiaries of OrCal. There are various restrictive covenants under the OrCal Senior Secured Notes which include limitations on additional indebtedness of OrCal and its wholly owned subsidiaries. Failure to comply with these and other covenants will, subject to customary cure rights, constitute an event of default by OrCal. In addition, there are restrictions on the ability of OrCal to make distributions to its shareholders, which include a required historical and projected 12-month debt service coverage ratio of not less than 1.25 (measured semi-annually as of June 30 and December 31 of each year). If OrCal fails to comply with the debt service coverage ratio it will be prohibited from making distributions to its shareholders. We are only required to measure these covenants on a semi-annual basis and as of December 31, 2016, (the last measurement date of the covenants) the actual historical 12-month debt service coverage ratio was 1.77, and the pro-forma 12-month debt service coverage ratio was 2.57. There was $35.2 million aggregate principal amount of OrCal Senior Secured Notes outstanding as of March 31, 2017.

#### OFC 2 Senior Secured Notes — Limited Recourse

In September 2011, OFC 2, one of our subsidiaries, and its wholly owned project subsidiaries (collectively, the "OFC 2 Issuers") entered into a note purchase agreement (the "Note Purchase Agreement") with the OFC 2 Noteholder Trust, as purchaser, John Hancock, as administrative agent, and the Department of Energy (DOE), as guarantor, in connection with the offer and sale of up to $350.0 million aggregate principal amount of OFC 2 Senior Secured Notes.

Subject to the fulfillment of customary and other specified conditions precedent, the OFC 2 Senior Secured Notes may be issued in up to six distinct series associated with the phased construction (Phase I and Phase II) of the Jersey Valley, McGinness Hills and Tuscarora geothermal power plants, which are owned by the OFC 2 Issuers. The OFC 2 Senior Secured Notes will mature on December 31, 2034 and the principal amount of the OFC 2 Senior Secured Notes will be payable in equal quarterly installments and in any event not later than December 31, 2034. Each series of notes will bear interest at a rate calculated based on a spread over the U.S. Treasury yield curve that will be set at least ten business days prior to the issuance of such series of notes. Interest will be payable quarterly in arrears. The DOE guarantees payment of 80% of principal and interest on the OFC 2 Senior Secured Notes pursuant to Section 1705 of Title XVII of the Energy Policy Act of 2005, as amended. The conditions precedent to the issuance of the OFC 2 Senior Secured Notes include certain specified conditions required by the DOE in connection with its guarantee of the OFC 2 Senior Secured Notes.

In October 2011, the OFC 2 Issuers completed the sale of $151.7 million aggregate principal amount of 4.687% Series A Notes due 2032 (the Series A Notes). The net proceeds from the sale of the Series A Notes, after deducting transaction fees and expenses, were approximately $141.1 million, and were used to finance a portion of the construction costs of Phase I of the McGinness Hills and Tuscarora power plants and to fund certain reserves. Principal and interest on the Series A Notes are payable quarterly in arrears on the last day of March, June, September and December of each year.

On June 20, 2014, Phase I of the Tuscarora facility achieved project completion under the Note Purchase Agreement. In accordance with the terms of the Note Purchase Agreement, we recalibrated the original financing assumptions and as a result the loan amount was adjusted through a principal payment of $4.3 million.

On August 29, 2014, OFC 2 received a $140.0 million loan under the OFC 2 Senior Secured Notes to finance the construction of phase II of the McGinness Hills project. This draw is the last tranche (the "Series C Notes") under the Note Purchase Agreement with John Hancock Life Insurance Company (USA), and is guaranteed by the U.S Department of Energy Loan Programs Office in accordance with and subject to the Department’s Loan Guarantee Program under section 1705 of Title XVII of the Energy Policy Act of 2005. The $140.0 million loan, which matures in December 2032, carries a 4.61% coupon with principal to be repaid on a quarterly basis. The OFC 2 Senior Secured Notes, which include loans for the Tuscarora, Jersey Valley and McGinness Hills complexes, are rated “BBB” by Standard & Poor’s.

In connection with the August 13, 2014 drawdown, we entered into an on-the-run interest lock agreement with a financial institution with a termination date of August 15, 2014. This on-the-run interest lock agreement had a notional amount of $140.0 million and was designated by us to as a cash flow hedge. The objective of this cash flow hedge was to eliminate the variability in the change in the 10-year U.S. Treasury rate as that is one of the components in the annual interest rate of the OFC 2 loan that was forecasted to be fixed on August 15, 2014. As such, we hedged the variability in total proceeds attributable to changes in the 10-year U.S. Treasury rate for the forecasted issuance of fixed rate OFC 2 loan. On the settlement date of August 18, 2014, we paid $1.5 million to the counterparty to the on-the-run interest rate lock agreement. The OFC 2 Senior Secured Notes are collateralized by substantially all of the assets of OFC 2 and those of its wholly owned subsidiaries and are fully and unconditionally guaranteed by all of the wholly owned subsidiaries of OFC 2. There are various restrictive covenants under the OFC 2 Senior Secured Notes, which include limitations on additional indebtedness of OFC 2 and its wholly owned subsidiaries. Failure to comply with these and other covenants will, subject to customary cure rights, constitute an event of default by OFC 2. In addition, there are restrictions on the ability of OFC 2 to make distributions to its shareholders.

Among other things, the distribution restrictions include a historical debt service coverage ratio requirement of at least 1.2 (on a blended basis for all OFC 2 power plants), measured, at the time of any proposed distribution, over each of the two six-months periods comprised of distinct consecutive fiscal quarters immediately preceding the proposed distribution, and a projected future debt service coverage ratio requirement of at least 1.5 (on a blended basis for all OFC 2 power plants), measured, at the time of any proposed distribution, over each of the two six-months periods comprised of distinct consecutive fiscal quarters immediately following such proposed distribution. As of March 31, 2017, our historical debt service coverage ratio was 2.54 and 2.27, respectively for each of the two six-month periods, and our projected future debt service coverage ratio was 1.88 and 2.14, respectively for each of the two six-month periods.

There was $242.7 million aggregate principal amount of OFC 2 Senior Secured Notes outstanding as of March 31, 2017.

We provided a guarantee in connection with the issuance of the Series A and C Notes, which will be available to be drawn upon if certain trigger events occur. The trigger events include any loss, liability, damage, expense or cost to the Jersey Valley facility caused by the interconnection under the various interconnection related agreements of the Dixie Meadows project that we may develop in the future.

#### Olkaria III Finance Agreement with OPIC — Limited Recourse

In August 2012, OrPower 4, one of our subsidiaries, entered into a finance agreement with OPIC, an agency of the United States government, to provide limited-recourse senior secured debt financing in an aggregate principal amount of up to $310.0 million (the "OPIC Loan") for the refinancing and financing of our Olkaria III geothermal power complex in Kenya. The finance agreement was amended on November 9, 2012.

The OPIC Loan is comprised of three tranches:

- Tranche I in an aggregate principal amount of $85.0 million and a fixed interest rate of 6.34%, which was drawn in November 2012, was used to prepay approximately $20.5 million (plus associated prepayment penalty and breakage costs of $1.5 million) of the DEG Loan, as described below under “Full Recourse Third Party Debt”. The remainder of Tranche I proceeds was used for reimbursement of prior capital costs and other corporate purposes. As of March 31, 2017, Tranche I has an outstanding balance of $64.9 million and matures on December 15, 2030.
- Tranche II in an aggregate principal amount of $180.0 million and a fixed interest rate of 6.29%, was used to fund the construction and well field drilling for Plant 2 of the Olkaria III geothermal power complex. In November 2012, an amount of $135.0 million was disbursed under this Tranche II, and in February 2013 the remaining $45.0 million was disbursed under this Tranche II. As of March 31, 2017, Tranche II has an outstanding balance of $140.3 million and matures on June 15, 2030.
- Tranche III in an aggregate principal amount of $45.0 million and a fixed interest rate of 6.12%, was used to fund the construction of Plant 3 of the Olkaria III geothermal power complex and was drawn down in full in November 2013. As of March 31, 2017, Tranche III has an outstanding balance of $36.9 million and matures on December 15, 2030.

OrPower 4 has a right to make voluntary prepayments of all or a portion of the OPIC Loan subject to prior notice, minimum prepayment amounts, and a prepayment premium of 2.0% in the first two years after the Plant 2 commercial operation date, declining to 1% in the third year after the Plant 2 commercial operation date, and without premium thereafter, plus a redemption premium. In addition, the OPIC Loan is subject to customary mandatory prepayment in the event of certain reductions in generation capacity of the power plants, unless such reductions will not cause the projected ratio of cash flow to debt service to fall below 1.7.

The OPIC Loan is secured by substantially all of OrPower 4’s assets and by a pledge of all of the equity interests in OrPower 4.

The finance agreement includes customary events of default, including failure to pay any principal, interest or other amounts when due, failure to comply with covenants, breach of representations and warranties, non-payment or acceleration of other debt of OrPower 4, bankruptcy of OrPower 4 or certain of its affiliates, judgments rendered against OrPower 4, expropriation, change of control, and revocation or early termination of security documents or certain project-related agreements, subject to various exceptions and notice, cure and grace periods.

The repayment of the remaining outstanding DEG Loan (see “Full-Recourse Third-Party Debt” below) in the amount of approximately $15.8 million as of March 31, 2017, has been subordinated to the OPIC Loan.

There are various restrictive covenants under the OPIC Loan, which include a required historical and projected 12-month debt service coverage ratio of not less than 1.4 (measured as of March 15, June 15, September 15 and December 15 of each year). If OrPower 4 fails to comply with these financial ratios it will be prohibited from making distributions to its shareholders. In addition, if the debt service coverage ratio falls below 1.1, subject to certain cure rights; such failure will constitute an event of default by OrPower 4. This covenant in respect of Tranche I became effective on December 15, 2014. As of March 31, 2017, the actual historical and projected 12-month debt service coverage ratio was 2.14 and 2.99, respectively.

As of March 31, 2017, $242.1 million of the OPIC Loan was outstanding.

#### Amatitlan financing — Limited Recourse

On July 31, 2015, one of our indirect wholly-owned subsidiaries, Ortitlản, Limitada, obtained a 12-year secured term loan in the principal amount of $42.0 million for the 20 MW Amatitlàn power plant in Guatemala. Under the credit agreement with Banco Industrial S.A. and Westrust Bank (International) Limited, we can expand the Amatitlàn power plant with financing to be provided either via equity, additional debt from Banco Industrial S.A. or from other lenders, subject to certain limitations on expansion financing in the credit agreement.

The loan is payable in 48 quarterly payments commencing September 30, 2015. The loan bears interest at a rate per annum equal to of the sum of the LIBO Rate (which cannot be lower than 1.25%) plus a margin of (i) 4.35%, as long as the Company’s guaranty of the loan (as described below) is outstanding or (ii) 4.75% otherwise. Interest is payable quarterly, on March 30, June 30, September 30 and December 30 of each year, on the stated maturity date of the loan and on any prepayment or payment of the loan. The loan must be prepaid upon the occurrence of certain events, such as casualty, condemnation, certain asset sales and expansion financing not provided by the lenders under the credit agreement, among others. The loan may be voluntarily prepaid if certain conditions are satisfied, including payment of a premium (ranging from 100-50 basis points) if prepayment occurs prior to the eighth anniversary of the loan.

There are various restrictive covenants under the Amatitlàn credit agreement. These include, among others, (i) a financial covenant to maintain a Debt Service Coverage Ratio (as defined in the credit agreement) of not less than 1.15 to 1.00 as of the last day of any fiscal quarter and (ii) limitations on Restricted Payments (as defined in the credit agreement) that, among other things, would limit dividends that could be paid to us unless the historical and projected Debt Service Coverage Ratio is not less than 1.25 to 1.00 for the four fiscal quarterly periods (calculated as a single accounting period). As of March 31, 2017, the actual historical and projected 12-month Debt Service Coverage Ratio was 1.35 and 1.85, respectively. The credit agreement includes various events of default that would permit acceleration of the loan (subject in some cases to grace and cure periods). These include, among others, a Change of Control (as defined in the credit agreement) and failure to maintain certain required balances in debt service and maintenance reserve accounts. The credit agreement includes certain equity cure rights for failure to maintain the Debt Service Coverage Ratio and the minimum amounts required in the debt service and maintenance reserve accounts.

The loan is secured by substantially all the assets of the borrower and a pledge of all of the membership interests of the borrower.

The Company has guaranteed payment of all obligations under the credit agreement and related financing documents. The guaranty is limited and the Company is only required to pay the guaranteed obligations if a “trigger event” occurs. A trigger event is the occurrence and continuation of a default by Instituto Nacional de Electricidad (“INDE”) in its payment obligations under the PPA for the Amatitlàn power plant or a refusal by INDE to receive capacity and energy sold under that PPA. Our obligations under the guaranty may be terminated prior to payment in full of the guaranteed obligations under certain circumstances described in the guaranty. If our guaranty is terminated early, the interest rate payable on the loan would increase as described above.

As of March 31, 2017, $35.9 million of this loan is outstanding.

#### Don A. Campbell Senior Secured Notes — Non-Recourse

On November 29, 2016, ORNI 47 LLC (“ORNI 47”) entered into a note purchase agreement (the “ORNI 47 Note Purchase Agreement”) with MUFG Union Bank, N.A., as collateral agent, Munich Reinsurance America, Inc. and Munich American Reassurance Company (the “Purchasers”) pursuant to which ORNI 47 issued and sold to the Purchasers $92.5 million aggregate principal amount of its 4.03% Senior Secured Notes due September 27, 2033 (the “Notes”) in a private placement exempt from the registration requirements of the Securities Act of 1933, as amended. ORNI 47 is the owner of the Don A. Campbell Phase I (“DAC 1”) geothermal power plant, and part of ORPD.

The net proceeds to ORNI 47 from the sale of the Notes, after deducting certain transaction expenses and the funding of a debt service reserve account, were approximately $87.1 million. ORNI 47 used the proceeds from the sale of the Notes to refinance the development and construction costs of the DAC 1 geothermal power plant, which were originally financed using equity.

ORNI 47 will pay a scheduled amount of principal of the Notes beginning on December 27, 2016 and then quarterly, on the 27th day of each March, June, September and December, until the Notes mature.

The Notes constitute senior secured obligations of ORNI 47 and are secured by all of the assets of ORNI 47. Under the ORNI 47 Note Purchase Agreement, ORNI 47 may prepay at any time all, or from time to time any part of, the Notes in an amount equal to at least $2 million or such lesser amount as may remain outstanding under the Notes at 100% of the principal amount to be prepaid plus the applicable make-whole amount determined for the prepayment date with respect to such principal amount. Upon the occurrence of a Change of Control (as defined in the ORNI 47 Note Purchase Agreement), ORNI 47 must make an offer to each holder of Notes to repurchase all of the holder’s Notes at 101% of the aggregate principal amount of Notes to be repurchased plus accrued and unpaid interest, if any, on the Notes to be repurchased to, but not including, the date of repurchase. Each holder of Notes may accept such offer in whole or in part. In certain events, including certain asset sales outside the ordinary course of business, ORNI 47 must make mandatory prepayments of the Notes at 100% of the principal amount to be prepaid. The ORNI 47 Note Purchase Agreement requires ORNI 47 to comply with certain covenants, including, among others, restrictions on the incurrence of indebtedness or liens, amendment or modification of material project documents, the ability of ORNI 47 to merge or consolidate with another entity. The ORNI 47 Note Purchase Agreement also contains customary events of default. In addition, there are restrictions on the ability of ORNI 47 to make distributions to its shareholders, which include a required historical and projected Debt Service Coverage Ratio not less than 1.20 for the four fiscal quarterly periods. As of March 31, 2017, the projected Debt Service Coverage Ratio was 1.84.

As of March 31, 2017, $90.8 million is outstanding under the DAC 1 Loan.

### Full-Recourse Third-Party Debt

### Credit Agreements

*Union Bank*. In February 2012, Ormat Nevada, our wholly owned subsidiary, entered into an amended and restated credit agreement with Union Bank. Under the credit agreement as amended and restated through the date of this report, the credit termination date is June 30, 2017. On December 31, 2016, the aggregate amount available under the credit agreement was increased by $10 million to $60.0 million. The facility is limited to the issuance, extension, modification or amendment of letters of credit. Union Bank is currently the sole lender and issuing bank under the credit agreement, but is also designated as an administrative agent on behalf of banks that may, from time to time in the future, join the credit agreement as parties thereto. In connection with this transaction, we entered into a guarantee in favor of the administrative agent for the benefit of the banks, pursuant to which we agreed to guarantee Ormat Nevada’s obligations under the credit agreement. Ormat Nevada’s obligations under the credit agreement are otherwise unsecured.

There are various restrictive covenants under the credit agreement, including a requirement for Ormat Nevada to comply with the following financial ratios, which are measured quarterly: (i) a 12-month debt to EBITDA ratio not to exceed 4.5; (ii) a 12-month debt service coverage ratio of not less than 1.35; and (iii) a distribution leverage ratio not to exceed 2.0. As of March 31, 2017: (i) the actual 12-month debt to EBITDA ratio was 2.85; (ii) the 12-month debt service coverage ratio was 2.51; and (iii) the distribution leverage ratio was 0.86. In addition, there are restrictions on dividend distributions in the event of a payment default or noncompliance with such ratios, and subject to specified carve-outs and exceptions, a negative pledge on the assets of Ormat Nevada in favor of Union Bank.

As of March 31, 2017, letters of credit in the aggregate amount of $32.6 million remain issued and outstanding under this committed credit agreement with Union Bank.

*HSBC.* In May 2013, Ormat Nevada entered into a credit agreement with HSBC Bank USA, N.A for one year with annual renewals. The current expiration date of the facility under this credit agreement is December 31, 2017. The aggregate amount available under the credit agreement was increased by $10 million to $35.0 million. This credit line is limited to the issuance, extension, modification or amendment of letters of credit and $10.0 million out of this credit line is available to be drawn for working capital needs. HSBC is currently the sole lender and issuing bank under the credit agreement, but is also designated as an administrative agent on behalf of banks that may, from time to time in the future, join the credit agreement as parties thereto. In connection with this transaction, we entered into a guarantee in favor of the administrative agent for the benefit of the banks, pursuant to which we agreed to guarantee Ormat Nevada’s obligations under the credit agreement. Ormat Nevada’s obligations under the credit agreement are otherwise unsecured.

There are various restrictive covenants under the credit agreement, including a requirement to comply with the following financial ratios, which are measured quarterly: (i) a 12-month debt to EBITDA ratio not to exceed 4.5; (ii) a 12-month debt service coverage ratio of not less than 1.35; and (iii) a distribution leverage ratio not to exceed 2.0. As of March 31, 2017: (i) the actual 12-month debt to EBITDA ratio was 2.85; (ii) the 12-month debt service coverage ratio was 2.51; and (iii) the distribution leverage ratio was 0.86. In addition, there are restrictions on dividend distributions in the event of a payment default or noncompliance with such ratios, and subject to specified carve-outs and exceptions, a negative pledge on the assets of Ormat Nevada in favor of HSBC.

As of March 31, 2017, letters of credit in the aggregate amount of $23.2 million remain issued and outstanding under this committed credit agreement.

*Other Banks*. We also have committed credit agreements with five other commercial banks for an aggregate amount of $429.8 million. Under the terms of these credit agreements, we or our Israeli subsidiary, Ormat Systems, can request (i) extensions of credit in the form of loans and/or the issuance of one or more letters of credit in the amount of up to $215.0 million and (ii) the issuance of one or more letters of credit in the amount of up to $214.8 million. The credit agreements mature at the end of March 2017 and July 2019. Loans and draws under the credit agreements or under any letters of credit will bear interest at the respective bank’s cost of funds plus a margin. As of March 31, 2017, loan balance of $30 million was outstanding under these credit agreements.

As of March 31, 2017, letters of credit with an aggregate stated amount of $263.7 million were issued and outstanding under these credit agreements.

### Letters of Credits under the Credit Agreements

Some of our customers require our project subsidiaries to post letters of credit in order to guarantee their respective performance under relevant contracts. We are also required to post letters of credit to secure our obligations under various leases and licenses and may, from time to time, decide to post letters of credit in lieu of cash deposits in reserve accounts under certain financing arrangements. In addition, our subsidiary Ormat Systems is required from time to time to post performance letters of credit in favor of our customers with respect to orders of products.

As of March 31, 2017, committed letters of credit in the aggregate amount of $319.6 million remained issued and outstanding under the credit agreements with Union Bank, HSBC and five of the commercial banks as described under “Credit Agreements”.

*Term Loans*. We have a $20.0 million term loan with a group of institutional investors, which matures on August 1, 2017, that is payable in 12 semi-annual installments commencing February 1, 2012, and bears interest at 6-month LIBOR plus 5.0%. As of March 31, 2017, $1.7 million was outstanding under this loan.

*Senior Unsecured Bonds.* We had an aggregate principal amount of approximately $250.0 million of senior unsecured bonds issued and outstanding. We issued approximately $142.0 million aggregate principal amount of these bonds in August 2010 and an additional $107.5 million aggregate principal amount in February 2011. Subject to early redemption, the principal of the bonds was repayable in a single bullet payment upon the final maturity of the bonds on August 1, 2017. The bonds bore interest at a fixed rate of 7.00%, payable semi-annually. The bonds that we issued in February 2011 were issued at a premium which reflects an effective fixed interest rate of 6.75%.

On September 8, 2016, the Company concluded an auction tender and accepted subscriptions for $204 million aggregate principal amount of two tranches of senior unsecured bonds (approximately $67 million aggregate principal amount of “Series 2 Bonds” and approximately $137 million aggregate principal amount of “Series 3 Bonds”). The proceeds from the Series 2 Bonds and Series 3 Bonds were used on September 29, 2016 to prepay the Company’s $250 million senior unsecured bonds that were payable on August 1, 2017.

The Series 2 Bonds will mature in September 2020 and bear interest at a fixed rate of 3.7% per annum, payable semi-annually. The Series 3 Bonds will mature in September 2022 and bear interest at a fixed rate of 4.45% per annum, payable semi-annually. The Series 2 Bonds and Series 3 Bonds will be repaid at maturity in a single bullet payment, unless earlier prepaid by Ormat pursuant to the terms and conditions of the trust instrument that governs such bonds. Both tranches received a rating of ilA+ from Maloot S&P in Israel with a stable outlook.

*Loan Agreement with DEG (The Olkaria III Complex).* OrPower 4 entered into a project financing loan (the “DEG Loan”) to refinance its investment in Plant 1 of the Olkaria III complex located in Kenya with a group of European development finance institutions arranged by Deutsche Investitions-und Entwicklungsgesellschaft mbH (DEG). The DEG Loan will mature on December 15, 2018, and is payable in 19 equal semi-annual installments. Interest on the loan is variable based on 6-month LIBOR plus 4.0%. We fixed the interest rate on most of the loan at 6.90%. As of March 31, 2017, $15.8 million is outstanding under the DEG Loan (out of which $10.8 million bears interest at a fixed rate).

In October 2012, OrPower 4, DEG and the other parties thereto amended and restated the DEG loan agreement (the “DEG Loan Agreement”). The amendment became effective on November 9, 2012 upon the execution by OrPower 4 of the Tranche I and Tranche II notes under the OPIC Loan and the related disbursements of the proceeds thereof under the OPIC finance agreement (as described above under the heading “Non-Recourse and Limited–Recourse Third-Party Debt”). In connection with the amendment, we prepaid in full two loans under the DEG Loan Agreement in the total principal amount of approximately $20.5 million. The amended and restated DEG Loan Agreement provides for (i) the release and discharge of all collateral security previously provided by OrPower 4 to the secured parties under the DEG Loan Agreement and the substitution of the Company’s guarantee of OrPower 4’s payment and certain other performance obligations in lieu thereof; (ii) the establishment of a LIBOR floor of 1.25% in respect of one of the loans under the DEG Loan Agreement, (iii) the elimination of most of the affirmative and negative covenants under the DEG Loan Agreement and (iv) certain other conforming provisions as a result of OrPower 4’s execution of the OPIC finance agreement and its obligations thereunder.

On October 20, 2016, OrPower 4 entered into a new $50 million subordinated facility agreement with DEG (the “DEG 2 Loan Agreement”) and on December 21, 2016, OrPower 4 completed a drawdown of the full loan commitment amount of $50 million, which bears interest at a fixed interest rate of 6.28% for the duration of the loan (the “DEG 2 Loan”). The DEG 2 Loan, which matures on June 21, 2028, will be repaid in 20 equal semi-annual principal installments commencing December 21, 2018. Proceeds of the DEG 2 Loan were used by OrPower 4 to refinance Plant 4 of the Olkaria III Complex, which was originally financed using equity. The DEG 2 Loan is subordinated to the senior loan provided by OPIC for Plants 1-3 of the Olkaria III Complex. The DEG 2 Loan is guaranteed by the Company.

Under the DEG 2 Loan Agreement, OrPower 4 may prepay at any time all, or from time to time any part of the DEG 2 Loan in an amount equal to at least $5 million or such lesser amount as may remain outstanding under the DEG 2 Loan at 100% of the principal amount to be prepaid plus the applicable make-whole amount and certain prepayment premium amount determined for the prepayment date with respect to such principal amount. In certain events, OrPower 4 must make mandatory prepayments of the DEG 2 Loan at 100% of the principal amount to be prepaid plus the applicable make-whole amount and certain prepayment premium amount determined for the prepayment date with respect to such principal amount. The DEG 2 Loan Agreement requires OrPower 4 to comply with certain covenants, including, among others, restrictions on the incurrence of indebtedness or liens. The DEG 2 Loan Agreement also contains customary events of default.

As of March 31, 2017, $50.0 million is outstanding under the DEG 2 Loan.

### Restrictive covenants

Our obligations under the credit agreements, the loan agreements, and the trust instrument governing the bonds, described above, are unsecured, but we are subject to a negative pledge in favor of the banks and the other lenders and certain other restrictive covenants. These include, among other things, a prohibition on: (i) creating any floating charge or any permanent pledge, charge or lien over our assets without obtaining the prior written approval of the lender; (ii) guaranteeing the liabilities of any third party without obtaining the prior written approval of the lender; and (iii) selling, assigning, transferring, conveying or disposing of all or substantially all of our assets, or a change of control in our ownership structure. Some of the credit agreements, the term loan agreements, and the trust instrument contain cross-default provisions with respect to other material indebtedness owed by us to any third party. In some cases, we have agreed to maintain certain financial ratios, which are measured quarterly, such as: (i) equity of at least $600.0 million and in no event less than 25% of total assets; (ii) 12-month debt, net of cash, cash equivalents, and short-term bank deposits to Adjusted EBITDA ratio not to exceed 6.0; and (iii) dividend distributions not to exceed 35% of net income in any calendar year. As of March 31, 2017: (i) total equity was $1,196.5 million and the actual equity to total assets ratio was 48.0% and (ii) the 12-month debt, net of cash and cash equivalents, to Adjusted EBITDA ratio was 2.46. During the three months ended March 31, 2017, we distributed interim dividends in an aggregate amount of $8.4 million. The failure to perform or observe any of the covenants set forth in such agreements, subject to various cure periods, would result in the occurrence of an event of default and would enable the lenders to accelerate all amounts due under each such agreement.

As described above, we are currently in compliance with our covenants with respect to the credit agreements, the loan agreements and the trust instrument, and believe that the restrictive covenants, financial ratios and other terms of any of our (or Ormat Systems’) full-recourse bank credit agreements will not materially impact our business plan or operations.

### Future minimum payments

As of March 31, 2017, future minimum payments under long-term obligations, excluding revolving credit lines with commercial banks and lease payments under the Puna lease transaction described below, are as follows:

*(Dollars in thousands)*

| Year ending December 31: |  |
| --- | ---: |
| 2017 | $52,570 |
| 2018 | 64,813 |
| 2019 | 59,146 |
| 2020 | 126,870 |
| 2021 | 46,579 |
| Thereafter | 593,276 |
| Total | $943,254 |

### Puna Power Plant Lease Transactions

In May 2005, Puna Geothermal Venture (“PGV”), our Hawaiian subsidiary, entered into a transaction involving the original geothermal power plant of the Puna complex located on the Big Island (the “Puna Power Plant”).

Pursuant to a 31-year head lease (the "Head Lease"), PGV leased the Puna Power Plant to an unrelated lessor (the “Puna Lessor”) in return for prepaid lease payments in the total amount of $83.0 million. The carrying value of the leased assets as of March 31, 2017 amounted to $27.3 million, net of accumulated depreciation of $33.5 million. The Puna Lessor simultaneously leased back the Puna Power Plant to PGV under a 23-year lease (the Project Lease). PGV’s rent obligations under the Project Lease will be paid solely from revenues generated by the Puna Power Plant under a PPA that PGV has with HELCO. The Head Lease and the Project Lease are non-recourse lease obligations. PGV’s rights in the geothermal resource and the related PPA have not been leased to the Puna Lessor as part of the Head Lease but are part of the Puna Lessor’s security package.

The transaction was concluded with financing parties by means of a leveraged lease transaction. A secondary stage of the lease transaction relating to two new geothermal wells that PGV drilled in the second half of 2005 (for production and injection) was completed on December 30, 2005. Pursuant to a 31-year head lease, PGV leased its geothermal power plant to the abovementioned financing parties in return for payments of $83.0 million by such financing parties to PGV, which are accounted for as deferred lease income.

There are various restrictive covenants under the lease agreement, including a requirement to have certain reserve funds that need to be managed by the indenture trustee in accordance with certain balance requirements. Such reserve funds amounted to $6.3 million and $2.9 million as of March 31, 2017 and December 31, 2016, respectively, and were included in restricted cash accounts in the consolidated balance sheets and were classified as current as they were used for current payments.

### Opal Transaction

On December 16, 2016, Ormat Nevada entered into an equity contribution agreement (the “Equity Contribution Agreement”) with OrLeaf LLC (“OrLeaf”) and JPM Capital Corporation (“JPM”) with respect to Opal Geo LLC (“Opal Geo”). Also on December 16, 2016, OrLeaf, a newly formed limited liability company formed by Ormat Nevada and ORPD LLC, entered into an amended and restated limited liability company agreement of Opal Geo (the “LLC Agreement”) with JPM. The transactions contemplated by the Equity Contribution Agreement and LLC Agreement will allow the Company to monetize PTCs and certain other tax benefits relating to the operation of five geothermal power plants located in Nevada.

In connection with the transactions contemplated by the Equity Contribution Agreement and the LLC Agreement, Ormat Nevada transferred its indirect ownership interest in the McGinness Hills (Phase I and Phase II), Tuscarora, Jersey Valley and Don A. Campbell Phase 2 (“DAC 2”) geothermal power plants to Opal Geo. Prior to such transfer, Ormat Nevada held an approximately 63.25% indirect ownership interest in DAC 2 through ORPD LLC, a joint venture between Ormat Nevada and Northleaf, and held, directly or indirectly, a 100% ownership interest in the remaining geothermal power plants that were transferred to Opal Geo.

Pursuant to the Equity Contribution Agreement, JPM contributed approximately $62.1 million to Opal Geo in exchange for 100% of the Class B Membership Interests of Opal Geo. JPM also agreed to make deferred capital contributions to Opal Geo based on the amount of electricity generated by the DAC 2 and McGinness Hills Phase II power plants which are eligible for the PTC. The Company expects the aggregate amount of JPM’s deferred capital contributions to equal approximately $21 million and to be paid over time covering the period through December 31, 2022.

Under the LLC Agreement, until December 31, 2022, OrLeaf will receive distributions of 97.5% of any distributable cash generated by operation of the power plants while JPM will receive distributions of 2.5% of any distributable cash generated by operation of the power plants. Unless JPM has already achieved its target internal rate of return on its investment in Opal Geo, from December 31, 2022 until JPM has achieved its target internal rate of return, JPM will receive 100% of any distributable cash generated by operation of the power plants. Thereafter, OrLeaf will receive distributions of 97.5%, and JPM will receive 2.5%, of any distributable cash generated by operation of the power plants.

Under the LLC Agreement, all items of Opal Geo income and loss, gain, deduction and credit (including the federal PTCs relating to the operation of the two PTC eligible power plants) will be allocated, until JPM has achieved its target internal rate of return on its investment in Opal Geo (and for so long as the two PTC eligible power plants are generating PTCs), 99% to JPM and 1% to OrLeaf, or 5% to JPM and 95% to OrLeaf if PTCs are no longer available to either of the two PTC eligible power plants. Once JPM achieves its target internal rate of return, all items of Opal Geo income and loss, gain, deduction and credit will be allocated 5% to JPM and 95% to OrLeaf.

Under the LLC Agreement, OrLeaf, which owns 100% of the Class A Membership Interests in Opal Geo, will serve as the managing member of Opal Geo and control the day-to-day management of Opal Geo and its portfolio of five power plants. However, in certain limited circumstances (such as bankruptcy of Orleaf, fraud or gross negligence by OrLeaf) JPM may remove OrLeaf as the managing member of Opal Geo. JPM, as the Class B Member of Opal Geo, has consent and approval rights with respect to certain items that are designated as major decisions for Opal Geo and the five power plants. In addition, by virtue of certain provisions in OrLeaf’s own limited liability company agreement, and consistent with the ORPD LLC formation documents, Northleaf has similar consent and approval rights with respect to OrLeaf’s determination of major decisions pertaining to the DAC 2 power plant. In both cases, these major decisions are generally equivalent to customary minority protection rights. As a result, the Company’s wholly owned subsidiary, Ormat Nevada, which serves as the managing member of OrLeaf and as the managing member of ORPD LLC, will effectively retain the day-to-day control and management of Opal Geo and its portfolio of five power plants.

The LLC Agreement contains certain customary restrictions on transfer applicable to both OrLeaf and JPM with respect to their respective Membership Interests in Opal Geo, and also provides OrLeaf with a right of first offer in the event JPM desires to transfer any of its Class B Membership Interests, pursuant to which OrLeaf may purchase such Class B Membership Interests. The LLC Agreement also provides OrLeaf with the option to purchase all of the Class B Membership Interests on either December 31, 2022 or the date that is 9 years after the closing date under the Equity Contribution Agreement at a price equal to the greater of (i) the fair market value of the Class B Membership Interests as of the date of purchase (subject to certain adjustments) and (ii) $3 million.

Pursuant to the Equity Contribution Agreement, the Company has provided a guaranty for the benefit of JPM of certain of OrLeaf’s indemnification obligations to JPM under the LLC Agreement. In addition, Ormat Nevada also provided a guaranty for the benefit of JPM of all present and future payment and performance obligations of OrLeaf under the LLC Agreement and each ancillary document to which OrLeaf is a party.

JPM’s contribution of approximately $62.1 million to Opal Geo in exchange for 100% of the Class B Membership Interests of Opal Geo was recorded as a $3.7 million allocation to noncontrolling interests and a $58.5 million allocation to liabilities associated with the sale of tax benefits.

### OPC Transaction

In June 2007, Ormat Nevada entered into agreements with affiliates of Morgan Stanley & Co. Incorporated and Lehman Brothers Inc. (Morgan Stanley Geothermal LLC and Lehman-OPC LLC, respectively), under which those investors purchased, for cash, interests in a newly formed subsidiary of Ormat Nevada, OPC, entitling the investors to certain tax benefits (such as PTCs and accelerated depreciation) and distributable cash associated with four geothermal power plants in Nevada.

The first closing under the agreements occurred in 2007 and covered our Desert Peak 2, Steamboat Hills, and Galena 2 power plants. The investors paid $71.8 million at the first closing. The second closing under the agreements occurred in 2008 and covered the Galena 3 power plant. The investors paid $63.0 million at the second closing.

Ormat Nevada continues to operate and maintain the power plants. Under the agreements, Ormat Nevada initially received all of the distributable cash flow generated by the power plants, while the investors received substantially all of the PTCs and the taxable income or loss (together, the "Economic Benefits"). Once Ormat Nevada recovered the capital that it invested in the power plants, which occurred in the fourth quarter of 2010, the investors began receiving both the distributable cash flow and the Economic Benefits. Once the investors reach a target after-tax yield on their investment in OPC (the “OPC Flip Date”), Ormat Nevada will receive 95% of both distributable cash and taxable income, on a going forward basis. Following the OPC Flip Date, Ormat Nevada also has the option to purchase the investors’ remaining interest in OPC at the then-current fair market value or, if greater, the investors’ capital account balances in OPC. If Ormat Nevada were to exercise this purchase option, it would become the sole owner of the power plants again.

Our voting rights in OPC are based on a capital structure that is comprised of Class A and Class B membership units. Through Ormat Nevada, we own all of the Class A membership units, which represent 75% of the voting rights in OPC, and the investors (as described below) own all of the Class B membership units, which represent 25% of the voting rights of OPC. Other than in respect of customary protective rights, all operational decisions at OPC are decided by the vote of a majority of the membership units. Following the OPC Flip Date, Ormat Nevada’s voting rights will increase to 95% and the investors’ voting rights will decrease to 5%. Ormat Nevada has, and after the OPC Flip Date will retain, the controlling voting interest in OPC and therefore consolidates OPC. We expect the OPC Flip Date to occur in the second quarter of 2017.

The Class B membership units have a 5% residual economic interest in OPC, which commences as of the OPC Flip Date. This residual 5% interest represents a noncontrolling interest and is not subject to mandatory redemption or guaranteed payments. The Class B membership units are currently held by Morgan Stanley Geothermal LLC and JPM. On October 30, 2009, Ormat Nevada acquired from Lehman-OPC LLC all of the Class B membership units of OPC held by Lehman-OPC LLC pursuant to a right of first offer for a purchase price of $18.5 million in cash and on February 3, 2011, Ormat Nevada sold to JPM all of the Class B membership units of OPC that it had acquired for a sale price of $24.9 million in cash.

### ORTP Transaction

On January 24, 2013, Ormat Nevada entered into agreements with JPM under which JPM purchased interests in a newly formed subsidiary of Ormat Nevada, ORTP, entitling JPM to certain tax benefits (such as PTCs and accelerated depreciation) associated with certain geothermal power plants in California and Nevada.

In connection with the transaction, Ormat Nevada transferred the Heber complex, the Mammoth complex, the Ormesa complex, the Steamboat 2 and 3, Burdette (Galena 1) and Brady power plants to ORTP, and sold class B membership units in ORTP to JPM. In connection with the closing, JPM paid approximately $35.7 million to Ormat Nevada and will make additional payments to Ormat Nevada of 25% of the value of PTCs generated by the portfolio over time. The additional payments were expected to be made until December 31, 2016 and total up to a maximum amount of $11.0 million, of which we received $1.4 million, $2.0 million, $1.7 million and $2.2 million in the first quarters of 2017, 2016, 2015 and 2014, respectively.

Ormat Nevada will continue to operate and maintain the power plants. Under the agreements, Ormat Nevada will initially receive all of the distributable cash flow generated by the power plants, while JPM will receive substantially all of the Economic Benefits. JPM’s return is limited by the terms of the transaction. Once JPM reaches a target after-tax yield on its investment in ORTP (the “ORTP Flip Date”), Ormat Nevada will receive 97.5% of the distributable cash and 95.0% of the taxable income, on a going forward basis. At any time during the twelve-month period after the end of the fiscal year in which the ORTP Flip Date occurs (but no earlier than the expiration of five years following the date that the last of the power plants was placed in service for purposes of federal income taxes), Ormat Nevada also has the option to purchase JPM’s remaining interest in ORTP at the then-current fair market value. If Ormat Nevada were to exercise this purchase option, it would become the sole owner of the power plants again.

The Class B membership units entitle the holder to a 5.0% (allocation of income and loss) and 2.5% (allocation of cash) residual economic interest in ORTP. The 5.0% and 2.5% residual interests commence on achievement by JPM of a contractually stipulated return that triggers the ORTP Flip Date. The actual ORTP Flip Date occurred on March 31, 2017. This residual 5.0% and 2.5% interest represents a noncontrolling interest and is not subject to mandatory redemption or guaranteed payments. We expect to negotiate a buyout from JPM of their Class B membership units during the second quarter of 2017.

Our voting rights in ORTP are based on a capital structure that is comprised of Class A and Class B membership units. Through Ormat Nevada, we own all of the Class A membership units, which represent 75.0% of the voting rights in ORTP. JPM owns all of the Class B membership units, which represent 25.0% of the voting rights of ORTP. Other than in respect of customary protective rights, all operational decisions in ORTP are decided by the vote of a majority of the membership units. Ormat Nevada retains the controlling voting interest in ORTP both before and after the ORTP Flip Date and therefore will continue to consolidate ORTP.

### Liquidity Impact of Uncertain Tax Positions

The Company has a liability associated with unrecognized tax benefits and related interest and penalties in the amount of approximately $6.3 million as of March 31, 2017. This liability is included in long-term liabilities in our condensed consolidated balance sheet because we generally do not anticipate that settlement of the liability will require payment of cash within the next twelve months. We are not able to reasonably estimate when we will make any cash payments required to settle this liability.

### Dividends

The following are the dividends declared by us since March 31, 2015:

| Date Declared | Dividend Amount per Share | Record Date | Payment Date |
| --- | ---: | --- | --- |
| May 6, 2015 | $0.06 | May 19, 2015 | May 27, 2015 |
| August 3, 2015 | $0.06 | August 18, 2015 | September 2, 2015 |
| November 3, 2015 | $0.06 | November 18, 2015 | December 2, 2015 |
| February 23, 2016 | $0.31 | March 15, 2016 | March 29, 2016 |
| May 4, 2016 | $0.07 | May 18, 2016 | May 24, 2016 |
| August 2, 2016 | $0.07 | August 16, 2016 | August 30, 2016 |
| November 7, 2016 | $0.07 | November 21, 2016 | December 6, 2016 |
| February 28, 2017 | $0.17 | March 15, 2017 | March 29, 2017 |
| May 8, 2017 | $0.08 | May 22, 2017 | May 31, 2017 |

### Historical Cash Flows

The following table sets forth the components of our cash flows for the periods indicated:

*(Dollars in thousands)*

|  | Three Months Ended March 31, 2017 | 2016 |
| --- | ---: | ---: |
| Net cash provided by operating activities | $71,463 | $27,044 |
| Net cash used in investing activities | (128,738) | (44,620) |
| Net cash provided by (used in) financing activities | 1,199 | (19,845) |
| Net change in cash and cash equivalents | (56,076) | (37,421) |

47

#### For the Three Months Ended March 31, 2017

Net cash provided by operating activities for the three months ended March 31, 2017 was $71.5 million, compared to $27.0 million for the three months ended March 31, 2016. The net increase of $44.5 million resulted primarily from: (i) a decrease in receivables of $19.1 million in the three months ended March 31, 2017, compared to an increase of $21.9 million in the three months ended March 31, 2016, as a result of timing of collection from our customers; and (ii) an increase in accounts payable and accrued expenses of $0.7 million in the three months ended March 31, 2017, compared to a decrease of $4.8 million in the three months ended March 31, 2016, as a result of timing in payments of our payables. The increase was partially offset by a decrease in billing in excess of costs and estimated earnings on uncompleted contracts, net of $18.4 million in our Product segment in the three months ended March 31, 2017, compared to $7.8 million in the three months ended March 31, 2016, as a result of timing in billing of our customers.

Net cash used in investing activities for the three months ended March 31, 2017 was $128.7 million, compared to $44.6 million for the three months ended March 31, 2016. The principal factors that affected our net cash used in investing activities during the three months ended March 31, 2017 were: (i) capital expenditures of $52.9 million, primarily for our facilities under construction; (ii) $35.3 million net cash paid for the acquisition of substantially all of the business and assets of VEI; (iii) a net increase of $25.6 million in restricted cash and cash equivalents due to the timing of debt repayments; and (iv) an investment in an unconsolidated company of $14.9 million. The principal factors that affected our net cash used in investing activities during the three months ended March 31, 2016 were capital expenditures of $31.0 million, primarily for our facilities under construction and a net increase of $14.6 million in restricted cash and cash equivalents, due to the timing of debt repayments.

Net cash provided by financing activities for the three months ended March 31, 2017 was $1.2 million, compared to $19.8 million of net cash used in financing activities for the three months ended March 31, 2016. The principal factors that affected the net cash used in financing activities during the three months ended March 31, 2017 were: (i) the repayment of long-term debt in the amount of $13.4 million; (ii) an $8.4 million cash dividend paid; (iii) $6.8 million cash paid to non-controlling interests; and (iv) a net increase of $30.0 million against our revolving lines of credit with commercial banks. The principal factors that affected our net cash used in financing activities during the three months ended March 31, 2016 were: (i) the repayment of long-term debt in the amount of $11.6 million; (ii) a $15.5 million cash dividend paid; and (iii) $6.3 million cash paid to non-controlling interest, reduced by a net increase of $9.0 million against our revolving lines of credit with commercial banks.

### EBITDA and Adjusted EBITDA

We calculate EBITDA as net income before interest, taxes, depreciation and amortization. We calculate Adjusted EBITDA as net income before interest, taxes, depreciation and amortization, adjusted for (i) termination fees, (ii) impairment of long-lived assets, (iii) write-off of unsuccessful exploration activities, (iv) any mark-to-market gains or losses from accounting for derivatives, (v) merger and acquisition transaction costs (vi) stock-based compensation, (vii) gains or losses from extinguishment of liability, and (viii) gains or losses on sales of subsidiaries and property, plant and equipment. EBITDA and Adjusted EBITDA are not measurements of financial performance or liquidity under accounting principles generally accepted in the United States of America (“U.S. GAAP”) and should not be considered as an alternative to cash flow from operating activities or as a measure of liquidity or an alternative to net earnings as indicators of our operating performance or any other measures of performance derived in accordance with U.S. GAAP. EBITDA and Adjusted EBITDA are presented because we believe they are frequently used by securities analysts, investors and other interested parties in the evaluation of a company’s ability to service and/or incur debt. However, other companies in our industry may calculate EBITDA and Adjusted EBITDA differently than we do.

Adjusted EBITDA for the three months ended March 31, 2017 was $91.8 million, compared to $80.2 million for the three months ended March 31, 2016.

The following table reconciles net cash provided by operating activities to EBITDA and Adjusted EBITDA for the three-month periods ended March 31, 2017 and 2016:

|  | Three Months Ended March 31, 2017 | 2016 |
| --- | ---: | ---: |
| Net cash provided by operating activities | $71,463 | $27,044 |
| Adjusted for: |  |  |
| Interest expense, net (excluding amortization of deferred financing costs) | 13,405 | 14,127 |
| Interest income | (244) | (320) |
| Income tax provision | 10,886 | 9,509 |
| Minority interest in earnings of subsidiaries | - | - |
| Adjustments to reconcile net income to net cash provided by operating activities (excluding depreciation and amortization) | (4,669) | 30,082 |
| EBITDA | 90,841 | 80,442 |
| Mark-to-market gains or losses from accounting for derivatives | (1,523) | (1,746) |
| Stock-based compensation | 1,713 | 842 |
| Gain on sale of subsidiary and property, plant and equipment | - | - |
| Termination fee | - | - |
| Impairment of long-lived assets | - | - |
| Loss from extinguishment of liability | - |  |
| Merger and aquisition transaction costs | 800 | 147 |
| Settlement expenses | - | - |
| Write-off of unsuccessful exploration activities | - | 557 |
| Adjusted EBITDA | $91,831 | $80,242 |
| Net cash used in investing activities | $(128,738) | $(44,620) |
| Net cash provided by (used in) financing activities | $1,199 | $(19,845) |

49

The following table reconciles Net income to EBITDA for the three-month periods ended March 31, 2017 and 2016:

|  | Three Months Ended March 31, 2017 | 2016 |
| --- | ---: | ---: |
| Net income | $39,735 | $30,945 |
| Adjusted for: |  |  |
| Interest expense, net (excluding amortization of deferred financing costs) | 13,405 | 14,127 |
| Interest income | (244) | (320) |
| Income tax provision | 10,886 | 9,509 |
| Depreciation and amortization | 27,059 | 26,181 |
| EBITDA | $90,841 | $80,442 |

### Capital Expenditures

Our capital expenditures primarily relate to: (i) the development and construction of new power plants, (ii) the enhancement of our existing power plants; and (iii) investment in activities under our new strategic plan .

The following is an overview of projects that are fully released for construction:

*Sarulla (Indonesia).* The project is being constructed in three phases of approximately 110 MW each, utilizing both steam and brine extracted from the geothermal field to increase the power plant’s efficiency. The first phase of the power plant commenced commercial operation on March 17, 2017. For the second phase of the power plant, engineering and procurement has been substantially completed, site construction is in progress and all of the major generating units, including those to be supplied by Ormat, were delivered. For the third phase of the power plant, engineering, procurement and construction work at the site are in progress and manufacturing of equipment to be supplied by Ormat is underway as planned. Ormat sent the first shipment of equipment to be manufactured by Ormat during the first quarter of 2017. Drilling for the second and third phases of the power plant is ongoing and the project has achieved to date, based on preliminary estimates, 100% of the required injection capacity and approximately 65% of the required production capacity. The project has missed a few milestones under the loan documents, but has received waivers from the lenders and is currently in compliance with the lenders’ requirements. The project experienced delays in field development and cost overruns resulting from delays and excess drilling costs. Due to the cost overruns in drilling, the lenders requested that the sponsors commit to provide additional equity. The sponsors have agreed and the project’s financing documents were revised to reflect this request. Ormat, in its capacity as a supplier of equipment to the project, has achieved all contractual milestones under the supply agreement.

The Sarulla project will be owned and operated by the consortium members under the framework of a Joint Operating Contract (“JOC”) and Energy Sales Contract (“ESC’). Under the JOC, PT Pertamina Geothermal Energy (“PGE”), the concession holder for the project, has provided the consortium with the right to use the geothermal field, and under the ESC, PT PLN, the state electric utility, will be the off-taker at Sarulla for a period of 30 years.

Ormat holds a 12.75% equity interest in the project, corresponding to a commitment to invest approximately $60 million of equity based on the current project plan.

*Heber 1 Power Plant (California).* We are currently in the process of enhancing the Heber 1 power plant of the Heber complex located in Imperial Valley, California. We are planning to convert artesian wells to pumped wells, add a new water cooling unit and replace one of the Ormat Energy Converters (“OECs”), following which we expect the capacity of the complex to reach 92 MW. Engineering and procurement is ongoing and completion of the enhancement is expected at the end of 2017. In December 2015, we started to sell power generated by the Heber 1 power plant under a new fixed price PPA with SCPPA.

*Platanares Project (Honduras).* We are currently developing the Geotermica Platanares geothermal project in Honduras. Construction and drilling activities are ongoing and certain of the equipment is already on site. In December 2015, we concluded the drilling activity as well as extensive testing that support the decision to construct a 35 MW project, which is larger than initially estimated. We hold the assets, including the project’s wells, land, permits and PPA, under a Build, Operate, Transfer (“BOT”) structure for 15 years from the date of commercial operation. Commercial operation is expected before the end of 2017.

*Tungsten Mountain (Nevada).* We are currently developing the 24 MW Tungsten Mountain geothermal power plant in Churchill County, Nevada. Field development has been completed, while site construction is ongoing. We have also secured the interconnection agreement . The project is expected to be on-line by the end of 2017.

*Olkaria III Plant 1 Repowering (Kenya).* We are currently repowering plant 1 of the 139MW Olkaria complex in Kenya. We plan to add additional OEC unit to the existing power plant that will add approximately 10MW to the complex. The generated electricity from the new unit will be sold under Plant 1 PPA.

*Brady Power Plant (Nevada).* We are currently in the process of enhancing the Brady power plant located in Churchill County, Nevada. We are planning to replace its equipment with new OECs, following which we expect the capacity of the complex to increase to approximately 12 MW. Engineering and manufacturing is ongoing and construction has started. We expect the enhancement to be completed during 2018.

*Rabitt Hill (Texas).* We are currently jointly developing the Rabitt Hill energy storage project located in Georgetown, Texas with Alevo Group SA. (“Alevo”). We will own and fund the majority of the costs associated with the 10 MW Rabbit Hill energy storage project and, under the terms of the agreement, will provide engineering and construction services and balance of plant equipment. Alevo will provide its innovative GridBank™ inorganic lithium ion energy storage system in conjunction with the power conversion systems. The project will consist of three GridBank™ enclosures and will provide FRRS as an open market participant in the ERCOT, an independent system operator that manages the flow of electric power to Texas customers. Construction of the project is ongoing. Progress and completion is pending the supply of batteries by Alevo.

The following is an overview of projects that are in initial stages of construction:

*Dixie Meadows (Nevada).* We are currently developing the 15-20 MW Dixie Meadows geothermal power plant in Churchill County, Nevada. Drilling is ongoing. The project is expected to be on-line by the end of 2018.

*Carson Lake Project.* We plan to develop the 20 MW Carson Lake project on Bureau of Land Management (BLM) leases located in Churchill County, Nevada. We drilled one well in 2016 that did not meet our commercial criteria. However, this well provided us with more data on the resource. We are currently evaluating the next development steps for the project.

*CD 4 Project.* We plan to develop 30 MW of new capacity at the Mammoth complex on land which is comprised mainly of BLM leases. We have commenced field development and drilled one production well and one injection well. Continued drilling is subject to receipt of additional permits. As part of the process to secure a transmission line, we are participating in the Southern California Edison Wholesale Distribution Access Tariff Transition Cluster Generator Interconnection Process (the “WDAT LGIA”) to deliver energy into the Southern California Edison system at the Casa Diablo Substation. Southern California Edison completed phase I and phase II cluster studies and the WDAT LGIA is being reviewed while re-evaluation of the system upgrades is being completed due to changes in the participants in the cluster study. We are not planning to make material capital expenditures on this project in 2017.

We have estimated approximately $418.0 million in capital expenditures for construction of new projects and enhancements to our existing power plants, of which we have invested approximately $187.0 million as of March 31, 2017. We expect to invest approximately $125.0 million of such total during the remainder of 2017 and the remaining approximately $106.0 million thereafter.

In addition, we estimate approximately $72.0 million in additional capital expenditures in the remainder of 2017 to be allocated as follows: (i) $25.0 million for development of new projects; (ii) $30.0 million for maintenance capital expenditures to our operating power plants; (iii) $14.0 million for continued exploration activity under various leases for geothermal resources where we have already started exploration activity; and (iv) $3.0 million for enhancements to our production facilities. In the aggregate, we estimate our total capital expenditures for the remainder of 2017 will be approximately $197.0 million.

### Exposure to Market Risks

Based on current conditions, we believe that we have sufficient financial resources to fund our activities and execute our business plans. However, the cost of obtaining financing for our project needs may increase significantly or such financing may be difficult to obtain.

We, like other power plant operators, are exposed to electricity price volatility risk. Our exposure to such market risk is currently limited because many of oulong-term PPAs (except for the 25 MW PPA for the Puna complex and the aggregate 90 MW PPAs for the Heber 2 power plant in the Heber complex, the Ormesa complex and the G2 power plant in the Mammoth complex) have fixed or escalating rate provisions that limit our exposure to changes in electricity prices.

The energy payments under the PPAs of the Heber 2 power plant in the Heber complex, the Ormesa complex and the G2 power plant in Mammoth complex are determined by reference to the relevant power purchaser’s short run avoided costs, or SRAC. A decline in the price of natural gas or an increase in the amount of renewable power sold to relevant power purchaser or competitive market will result in a decrease in the incremental cost that the power purchaser avoids by not generating its electrical energy needs from natural gas, or by reducing the price of purchasing its electrical energy needs from natural gas power plants, which in turn will reduce the energy rates that we may charge under the relevant PPA for these power plants. In March 2014, May 2015 and February 2016, we entered into derivative transactions to reduce our exposure to the price of natural gas under these PPAs, until December 29, 2016. The Puna complex is currently benefiting from energy prices which are higher than the floor under the 25 MW PPA for the Puna complex as a result of the high fuel costs that impact HELCO’s avoided costs.

As of March 31, 2017, 91.9% of our consolidated long-term debt was fixed rate debt and therefore was not subject to interest rate volatility risk. As of such date, 8.1% of our long-term debt was floating rate debt, exposing us to interest rate risk in connection therewith. As of March 31, 2017, $79.0 million of our long-term debt remained subject to some interest rate risk.

We currently maintain our surplus cash in short-term, interest-bearing bank deposits, money market securities and commercial paper (with a minimum investment grade rating of AA by Standard & Poor’s Ratings Services.)

Our cash equivalents are subject to interest rate risk. Fixed rate securities may have their market value adversely impacted by a rise in interest rates, while floating rate securities may produce less income than expected if interest rates fall. As a result of these factors, our future investment income may fall short of expectations because of changes in interest rates or we may suffer losses in principal if we are forced to sell securities that decline in market value because of changes in interest rates.

We are also exposed to foreign currency exchange risk, in particular the fluctuation of the U.S. dollar versus the NIS and Euro. Risks attributable to fluctuations in currency exchange rates can arise when we or any of our foreign subsidiaries borrow funds or incur operating or other expenses in one type of currency but receive revenues in another. In such cases, an adverse change in exchange rates can reduce such subsidiary’s ability to meet its debt service obligations, reduce the amount of cash and income we receive from such foreign subsidiary, or increase such subsidiary’s overall expenses. Risks attributable to fluctuations in foreign currency exchange rates can also arise when the currency denomination of a particular contract is not the U.S. dollar. Substantially all of our PPAs in the international markets are either U.S. dollar-denominated or linked to the U.S. dollar except for our operation in the Island of Guadeloupe , where we own and operate the Boulliante power plant which sells its power under a Euro-denominated PPA with Électricité de France S.A. ("EDF") . Our construction contracts from time to time contemplate costs which are incurred in local currencies. The way we often mitigate such risk is to receive part of the proceeds from the contract in the currency in which the expenses are incurred. Currently, we have forward contracts in place to reduce our foreign currency exposure, and expect to continue to use currency exchange and other derivative instruments to the extent we deem such instruments to be the appropriate tool for managing such exposure. We do not believe that our exchange rate exposure has or will have a material adverse effect on our financial condition, results of operations or cash flows.

We performed a sensitivity analysis on the fair values of our put options on natural gas prices, long-term debt obligations, and foreign currency exchange forward contracts. The put options on natural gas prices and foreign currency exchange forward contracts listed below principally relate to trading activities. The sensitivity analysis involved increasing and decreasing forward rates at March 31, 2017 and December 31, 2016 by a hypothetical 10% and calculating the resulting change in the fair values.

At this time, the development of our new strategic plan has not exposed us to any additional market risk. However, as the implementation of the plan progresses, we may be exposed to additional or different market risks.

The results of the sensitivity analysis calculations as of March 31, 2017 and December 31, 2016 are presented below:

*(Dollars in thousands)*

| Risk | Assuming a 10% Increase in Rates March 31, 2017 | December 31, 2016 | Assuming a 10% Decrease in Rates March 31, 2017 |  | December 31, 2016 |  | Change in the Fair Value of |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | --- |
| Put options on natural gas price | $(158) | $- | $344 |  | $- |  | NGI futures |
| Foreign Currency | (4,419) | (4,665) | 5,402 |  | 4,632 |  | Foreign currency forward contracts |
| Interest Rate | (270) | (254) | 257 |  | 260 |  | Ormat Funding Corp. (“OFC”) |
| Interest Rate | (256) | (281) | 259 |  | 284 |  | Orcal Geothermal Inc. (“OrCal”) |
| Interest Rate | (6,973) | (7,714) | 7,281 |  | 7,496 |  | OFC 2 LLC (“OFC 2”) |
| Interest Rate | (65) | (64) | 65 |  | 65 |  | Loan from DEG |
| Interest Rate | (7,417) | (7,667) | 7,770 |  | 8,039 |  | Loan from OPIC |
| Interest Rate | (4,134) | (4,351) | 4,223 |  | 4,472 |  | Senior unsecured bonds |
| Interest Rate | (1,521) | (1,568) | 1,589 |  | 1,639 |  | New DEG (“DEG 2”) loan |
| Interest Rate | (2,684) | (2,749) | 2,820 |  | 2,890 |  | Don A. Campble (“DAC I”) Senior Secured Notes |
| Interest Rate | - (1) | - (1) | - | (1) | - | (1) | Amatitlan Loan |
| Interest Rate | (161) | (161) | 167 |  | 167 |  | Other long-term loans |

(1) The application of a 10% increase and decrease to the interest rate, did not exceed the minimum rate as set in the loan agreement.

### Effect of Inflation

We do not expect that inflation will be a significant risk in the near term, given the current global economic conditions, however, that could change in the future. To address rising inflation, some of our contracts include certain provisions that mitigate inflation risk.

In connection with the Electricity segment, inflation may directly impact an expense we incur for the operation of our projects, thereby increasing our overall operating costs. The negative impact of inflation may be partially offset by price adjustments built into some of our PPAs that could be triggered upon such occurrences. The energy payments pursuant to the PPAs for the Brady power plant, the Steamboat 2 and 3 power plants, the Steamboat Hills power plant, and the Burdette power plant increase every year through the end of the relevant terms of such agreements, though such increases are not directly linked to the CPI or any other inflationary index. Lease payments are generally fixed, while royalty payments are generally calculated as a percentage of revenues and therefore are not significantly impacted by inflation. In our Product segment, inflation may directly impact fixed and variable costs incurred in the construction of our power plants, thereby increasing our operating costs in the Product segment. We are more likely to be able to offset all or part of this inflationary impact through our project pricing. With respect to power plants that we build for our own electricity production, inflationary pricing may impact our operating costs which may be partially offset in the pricing of the new long-term PPAs that we negotiate.

### Concentration of Credit Risk

Our credit risk is currently concentrated with the following major customers: Southern California Public Power Authority, KPLC, Sierra Pacific Power Company and Nevada Power Company (subsidiaries of NV Energy). If any of these electric utilities fails to make payments under its PPAs with us, such failure would have a material adverse impact on our financial condition. Also, by implementing our new multi-year strategic plan we may be exposed, by expanding our customer base, to different credit profile customers than our current customers.

Sierra Pacific Power Company and Nevada Power Company accounted for 18.8% and 23.2% of our total revenues for the three months ended March 31, 2017 and 2016, respectively.

Southern California Public Power Authority accounted for 9.0% and 12.1% of our total revenues for the three months ended March 31, 2017 and 2016, respectively.

KPLC accounted for 14.3% and 17.4% of our total revenues for the three months ended March 31, 2017 and 2016, respectively.

Hyundai (Sarulla geothermal power project) accounted for 6% and 9% of the Company’s total revenues for the three months ended March 31, 2017 and 2016, respectively.

### Government Grants and Tax Benefits

The U.S. government encourages production of electricity from geothermal resources through certain tax subsidies. If we started construction of a new geothermal power plant in the U.S. by December 31, 2016, we are permitted to claim a tax credit against our U.S. federal income taxes equal to 30% of certain eligible costs when the project is placed in service. If we fail to meet the start of construction deadline for such a project, then the 30% credit is reduced to 10%. In lieu of the 30% tax credit (if the project qualifies), we are permitted to claim a tax credit based on the power produced from a geothermal power plant. These production-based credits, which in 2015 were 2.3 cents per kWh, are adjusted annually for inflation and may be claimed for ten years on the electricity produced by the project and sold to third parties after the project is placed in service. The owner of the power plant may not claim both the 30% tax credit and the production-based tax credit. Under current tax rules, any unused tax credit has a one-year carry back and a twenty-year carry forward. If we claim the ITC, our “tax basis” in the plant that we can recover through depreciation must be reduced by half of the ITC. If we claim the PTC, there is no reduction in the tax basis for depreciation. New solar projects that are under construction by December 2019 will qualify for a 30% investment tax credit. The credit will fall to 26% for projects starting construction in 2020 and 22% for projects starting construction in 2021. Projects that are under construction before these deadlines must be placed in service by December 2023 to qualify. The investment credit will revert to its permanent 10% level after that.

We are also permitted to depreciate, or write off, most of the cost of the plant. In those cases where we claimed the one-time 30% (or 10%) tax credit or received the Treasury cash grant, our tax basis in the plant that we can recover through depreciation is reduced by one-half of the tax credit or cash grant; if in the future we claim other tax credits, there is no reduction in the tax basis for depreciation. For projects that are placed into service after December 31, 2011 and before January 1, 2017, a depreciation “bonus” will permit us to write off 50% of the cost of that equipment in the year the power plant is placed into service. New equipment put in service in 2018 would qualify for a 40% bonus. Equipment put in service in 2019 would qualify for a 30% bonus. After applying any depreciation bonus that is available, we can write off the remainder of our tax basis in the plant, if any, over five years on an accelerated basis, meaning that more of the cost may be deducted in the first few years than during the remainder of the depreciation period.

Ormat Systems received “Benefited Enterprise” status under Israel’s Law for Encouragement of Capital Investments, 1959 (the Investment Law), with respect to two of its investment programs through 2011. In January 2011, new legislation amending the Investment Law was enacted. Under the new legislation, a uniform rate of corporate tax will apply to all qualified income of certain industrial companies, as opposed to the previous law’s incentives that are limited to income from a “Benefited Enterprise” during their benefits period. As a result, we now pay a uniform corporate tax rate of 16% with respect to that qualified income.

## Market risk

As filed, 199 characters.

The information appearing under the headings “Exposure to Market Risks” and “Concentration of Credit Risk” in Part I, Item 2 of this quarterly report on Form 10-Q is hereby incorporated by reference.

## Controls and procedures

As filed, 1,306 characters.

### a. Evaluation of disclosure controls and procedures

Our management, with the participation of our Chief Executive Officer and Chief Financial Officer, evaluated the effectiveness of our disclosure controls and procedures to ensure that the information required to be disclosed in our filings pursuant to Rule 13a-15 under the Securities and Exchange Act of 1934, as amended, is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission’s rules and forms and to ensure that such information is accumulated and communicated to management, including our Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure. Based on that evaluation, as of March 31, 2017, our Chief Executive Officer and Chief Financial Officer have concluded that our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934, as amended) were effective.

### b. Changes in internal controls over financial reporting

There were no changes in our internal controls over financial reporting in the first quarter of 2017 that have materially affected or are reasonably likely to materially affect our internal controls over financial reporting.

## Risk factors

As filed, 212 characters.

A comprehensive discussion of our other risk factors is included in the “Risk Factors” section of our annual report on Form 10-K for the year ended December 31, 2016 which was filed with the SEC on March 1, 2017.

Filed May 9, 2017.
Source: SEC EDGAR, the filing index for accession 0001437749-17-008423. Last ingested by Listed: Nov 5, 2026, 13:18 ET. No prices; not investment advice.