## Figures reported in this filing

Standardized XBRL line items for the period ended 2022-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2022-01-01 to 2022-03-31 | $474.0m | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 3 months, 2022-01-01 to 2022-03-31 | $405.6m | us-gaap:CostOfGoodsAndServicesSold |
| Gross profit | 3 months, 2022-01-01 to 2022-03-31 | $68.4m | us-gaap:GrossProfit |
| Selling, general and administrative | 3 months, 2022-01-01 to 2022-03-31 | $39.7m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months, 2022-01-01 to 2022-03-31 | $28.7m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2022-01-01 to 2022-03-31 | $2.3m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2022-01-01 to 2022-03-31 | $17.4m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2022-01-01 to 2022-03-31 | $0.32 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2022-01-01 to 2022-03-31 | $0.34 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2022-01-01 to 2022-03-31 | 53,636,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2022-01-01 to 2022-03-31 | −$276.1m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2022-01-01 to 2022-03-31 | $889.0k | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2022-03-31 | $68.3m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2022-03-31 | $845.2m | us-gaap:AssetsCurrent |
| Total assets | at 2022-03-31 | $2.53bn | us-gaap:Assets |
| Current liabilities | at 2022-03-31 | $395.1m | us-gaap:LiabilitiesCurrent |
| Current portion of debt | at 2022-03-31 | $80.2m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2022-03-31 | $729.9m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 37,821 characters.

*You should read the following discussion and analysis of our financial condition and results of operations together with our unaudited condensed consolidated financial statements and the related notes thereto included in Part I, Item 1 of this Quarterly Report on Form 10-Q and the audited consolidated financial statements and notes thereto and management’s discussion and analysis of financial condition and results of operations for the year ended December 31, 2021 included in our Annual Report on Form 10-K (“2021 Annual Report”) for the year ended December 31, 2021 filed on March 1, 2022 with the U.S. Securities and Exchange Commission (“SEC”). This Quarterly Report on Form 10-Q contains “forward-looking statements” within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended, (the “Exchange Act”). Forward looking statements include statements regarding our strategy, future operations, future financial position, future revenues, projected costs, prospects, plans, objectives of management, expected market growth and other characterizations of future events or circumstances. All statements, other than statements of historical fact, including statements that refer to our expectations as to the future growth of our business and associated expenses; our expectations as to revenue generation; the future availability of borrowings under our revolving credit facility; the expected future growth of the market for energy efficiency and renewable energy solutions; our backlog, awarded projects and recurring revenue and the timing of such matters; our expectations as to acquisition activity; the impact of any restructuring; the uses of future earnings; our intention to repurchase shares of our Class A common stock; the expected energy and cost savings of our projects; the expected energy production capacity of our renewable energy plants; the results of the SEC’s investigation into our revenue recognition and compensation practices in our software-as-a-service businesses; the impact of the ongoing COVID-19 pandemic and supply chain disruptions and shortage of materials; our expectations related to our agreement with SCE including the impact of any delays; the impact of the U.S. Department of Commerce’s solar panel import investigation and other characterizations of future events or circumstances are forward-looking statements. Forward looking statements are often, but not exclusively, identified by the use of words such as “may,” “will,” “expect,” “believe,” “anticipate,” “intend,” “could,” “estimate,” “target,” “project,” “predict” or “continue,” and similar expressions or variations. These forward-looking statements are based on current expectations and assumptions that are subject to risks, uncertainties and other factors that could cause actual results and the timing of certain events to differ materially and adversely from future results expressed or implied by such forward-looking statements. Risks, uncertainties and factors that could cause or contribute to such differences include, but are not limited to, those discussed in the section titled “Risk Factors,” set forth in Item 1A of our 2021 Annual Report and in Item 1A and elsewhere in this Quarterly Report on Form 10-Q. The forward-looking statements in this Quarterly Report on Form 10-Q represent our views as of the date of this Quarterly Report on Form 10-Q. Subsequent events and developments may cause our views to change. However, while we may elect to update these forward-looking statements at some point in the future, we have no current intention of doing so and undertake no obligation to do so except to the extent required by applicable law. You should, therefore, not rely on these forward-looking statements as representing our views as of any date subsequent to the date of this Quarterly Report on Form 10-Q.*

### Overview

Ameresco is a leading clean technology integrator with a comprehensive portfolio of energy efficiency and renewable energy supply solutions. We help organizations meet energy savings and energy management challenges with an integrated comprehensive approach to energy efficiency and renewable energy. Leveraging budget neutral solutions, including energy savings performance contracts (“ESPCs”) and power purchase agreements (“PPAs”), we aim to eliminate the financial barriers that traditionally hamper energy efficiency and renewable energy projects.

Drawing from decades of experience, Ameresco develops tailored energy management projects for its customers in the commercial, industrial, local, state, and federal government, K-12 education, higher education, healthcare, public housing sectors, and utilities.

We provide solutions primarily throughout North America and the U.K. and our revenues are derived principally from energy efficiency projects, which entail the design, engineering, and installation of equipment and other measures that incorporate a range of innovative technology and techniques to improve the efficiency and control the operation of a facility’s energy infrastructure; this can include designing and constructing a central plant or cogeneration system for a customer providing power, heat and/or cooling to a building, or other small-scale plant that produces electricity, gas, heat or cooling from renewable sources of energy. We also derive revenue from long-term O&M contracts, energy supply contracts for renewable energy operating assets that we own, integrated-PV, and consulting and enterprise energy management services.

In addition to organic growth, strategic acquisitions of complementary businesses and assets have been an important part of our growth enabling us to broaden our service offerings and expand our geographical reach. In December 2021, we completed the acquisition of Plug Smart, an Ohio-based energy services company that specializes in the development and implementation of budget neutral capital improvement projects including building controls and building automation systems. This acquisition allows us to expand our existing pipeline and solution offerings in the smart buildings sector. The pro forma effects of this acquisition were not material to our operations for the fiscal years presented.

### Key Factors and Trends

### The Southern California Edison (“SCE”) Agreement

In October 2021, we entered into a contract with SCE to design and build three grid scale battery energy storage systems (“BESS”) at existing substation parcels throughout SCE’s service territory in California. The engineering, procurement and construction price is approximately $892.0 million, in the aggregate, including two years of O&M revenues, subject to customary potential adjustments for changes in the work.

We are obligated under the SCE Agreement to achieve substantial completion of all facilities, subject to extension for specified force majeure events and customer-caused delays, no later than August 1, 2022 (the “Guaranteed Completion Date”). If we fail to achieve substantial completion of any of the facilities by the Guaranteed Completion Date, as such date may be extended, we are obligated to pay liquidated damages. In addition, we provided availability and capacity guarantees under the SCE Agreement, failure of which entitles the customer to liquidated damages. We expect a material portion of our revenue for 2022 will be generated from this SCE Agreement, and a material portion of the contract expenditures under this agreement have been and are being incurred during the first half of 2022. If we fail to achieve the milestone dates or fail to meet the availability and capacity guarantees, we may be required to pay liquidated damages and under certain circumstances SCE may have a right to terminate the agreement.

As previously disclosed, at the end of March 2022, our battery supplier for the SCE battery storage project indicated that the COVID-19 lockdowns in several regions around China were having an adverse impact on the supplier’s ability to deliver batteries on the agreed upon timeline. In addition, the supplier indicated that newly implemented Chinese transportation safety policies may cause delays in the shipment of a portion of the batteries. Following a review of these circumstances, we provided SCE with a force majeure notice under the SCE Agreement as we determined that these circumstances may prevent us from fully completing all three BESS projects by the August 1, 2022 Guaranteed Completion Date. Under the SCE Agreement, the occurrence of force majeure events, including certain COVID-related delays, results in extensions of required completion deadlines without liquidated damages and an increase in the contract price, subject to the party claiming a force majeure event being in compliance with its contractual obligations. We are engaged in continuing discussions with SCE regarding the applicability and scope of any force majeure relief relating to these circumstances, and are also actively working with SCE, our suppliers, and governmental agencies to mitigate delays.

### COVID-19, Supply Chain Disruptions, and Other Global Factors

We continue to monitor the impact of COVID-19 on our operations, financial results, and liquidity. The impact to our future operations and results, however, remains uncertain and will depend on a number of factors, including, but not limited to, the emergence and spread of more transmissible variants, the overall duration and severity of the pandemic, and its impact on the global economy, our customers, and business and workforce disruptions. Infection rates and regulations continue to fluctuate in various regions and there are ongoing global impacts resulting from the pandemic that may persist, including challenges and increases in costs for logistics and supply chains, such as increased port congestion, and intermittent supplier delays as well as shortage of certain components needed for our business, such as lithium-ion battery cells for our energy storage products. During the three months ended March 31, 2022, we experienced supply chain disruptions, including as a result of COVID-19, causing delays in the timely delivery of material to customer sites and delays and disruptions in the completion of certain projects, including those pursuant to the SCE Agreement. This negatively impacted our results of operations during the three months ended March 31, 2022. We expect the trends of supply challenges to continue for the remainder of this year. We continue to monitor macroeconomic conditions to remain flexible and to optimize and evolve our business as appropriate to address the challenges presented from these conditions. For example, in April 2022, we entered into a binding framework agreement term sheet with a battery manufacturer for the purchase and sale of battery energy storage (“BESS”) equipment for our BESS projects at committed amounts and agreed upon delivery dates for a period of several years. The purchase and sale commitment covers BESS equipment to be used for our BESS projects and assets. In connection with entering into the term sheet, we agreed to pay a $10 million deposit which will be credited against our future equipment purchases.

In March 2022, the US Department of Commerce announced that it is investigating if certain solar cell and panel imports from Malaysia, Vietnam, Thailand and Cambodia are circumventing anti-dumping and countervailing duty orders. We do not expect that this investigation will have a material impact on our business in the near term, as we have a stockpile of solar panels from a large purchase several years ago. However, the investigation and any resulting duties and tariffs imposed may disrupt the solar panel supply chain, increase the cost for solar cells and panels and ultimately impact the demand for clean energy solutions. We are monitoring the investigation closely.

### Climate Change and Effects of Seasonality

The global emphasis on climate change and reducing carbon emissions has created opportunities for our industry. Sustainability has been at the forefront of our business since its inception, and we are committed to staying at the leading edge of innovation taking place in the energy sector. We believe the next decade will be marked by dramatic changes in the power infrastructure with resources shifting to more distributed assets, storage, and microgrids to increase overall reliability and resiliency. The sustainability efforts are impacted by regulations, and changes in the regulatory climate may impact the demand for our products and offerings. See “Our business depends in part on federal, state, provincial and local government support for energy efficiency and renewable energy, and a decline in such support could harm our business” and “Compliance with environmental laws could adversely affect our operating results” in Item 1A, Risk Factors of our 2021 Annual Report.

Climate change also brings risks, as the impacts have caused us to experience more frequent and severe weather interferences, and this trend may continue. We are subject to seasonal fluctuations and construction cycles, particularly in climates that experience colder weather during the winter months, such as the northern United States and Canada, and climates that experience extreme weather events, such as wildfires, storms or flooding, or at educational institutions, where large projects are typically carried out during summer months when their facilities are unoccupied. In addition, government customers, many of which have fiscal years that do not coincide with ours, typically follow annual procurement cycles and appropriate funds on a fiscal-year basis even though contract performance may take more than one year. Further, government contracting cycles can be affected by the timing of, and delays in, the legislative process related to government programs and incentives that help drive demand for energy efficiency and renewable energy projects. As a result, our revenues and operating income in the third and fourth quarter are typically higher, and our revenues and operating income in the first quarter are typically lower, than in other quarters of the year, however, this may become harder to predict with the potential effects of climate change. As a result of such fluctuations, we may occasionally experience declines in revenues or earnings as compared to the immediately preceding quarter, and comparisons of our operating results on a period-to-period basis may not be meaningful.

Our annual and quarterly financial results are also subject to significant fluctuations as a result of other factors, many of which are outside our control.

### Stock-based Compensation

During the three months ended March 31, 2022, we granted 312,500 common stock options to certain employees under our 2020 Stock Incentive Plan. As a result, our unrecognized stock-based compensation expense increased from $41.1 million at December 31, 2021 to $46.3 million at March 31, 2022 and is expected to be recognized over a weighted-average period of four years. See Note 15 “Stock-based Compensation” for additional information.

### Backlog and Awarded Projects

Backlog is an important metric for us because we believe strong order backlogs indicate growing demand and a healthy business over the medium to long term, conversely, a declining backlog could imply lower demand.

The following table presents our backlog:

*(In Thousands)*

| Project Backlog | As of March 31, 2022 | 2021 |
| --- | ---: | ---: |
| Fully-contracted backlog | $1,342,150 | $787,815 |
| Awarded, not yet signed customer contracts | 1,754,050 | 1,521,160 |
| Total project backlog | $3,096,200 | $2,308,975 |
| 12-month project backlog | $1,154,400 | $607,000 |
| **O&M Backlog** |  |  |
| Fully-contracted backlog | $1,211,620 | $1,126,895 |
| 12-month O&M backlog | $73,400 | $64,360 |

Our $892 million SCE Agreement was entered into in October 2021 and significantly increased our fully-contracted backlog for the three months ended March 31, 2022 as compared to the three months ended March 31, 2021. We anticipate that the SCE Agreement will be an important driver of our results in 2022.

Total project backlog represents energy efficiency projects that are active within our sales cycle. Our sales cycle begins with the initial contact with the customer and ends, when successful, with a signed contract, also referred to as fully-contracted backlog. Our sales cycle recently has been averaging 18 to 42 months. Awarded backlog is created when a potential customer awards a project to Ameresco following a request for proposal. Once a project is awarded but not yet contracted, we typically conduct a detailed energy audit to determine the scope of the project as well as identify the savings that may be expected to be generated from upgrading the customer’s energy infrastructure. At this point, we also determine the subcontractors, what equipment will be used, and assist in arranging for third party financing, as applicable. Recently, awarded projects have been taking an average of 12 to 24 months to result in a signed contract and convert to fully-contracted backlog. It may take longer, as it depends on the size and complexity of the project. Historically, approximately 90% of our awarded backlog projects have resulted in a signed contract. After the customer and Ameresco agree to the terms of the contract and the contract is executed, the project moves to fully-contracted backlog. The contracts reflected in our fully-contracted backlog typically have a construction period of 12 to 36 months and we typically expect to recognize revenue for such contracts over the same period.

Our O&M backlog represents expected future revenues under signed multi-year customer contracts for the delivery of O&M services, primarily for energy efficiency and renewable energy construction projects completed by us for our customers.

We define our 12-month backlog as the estimated amount of revenues that we expect to recognize in the next twelve months from our fully-contracted backlog. See “We may not recognize all revenues from our backlog or receive all payments anticipated under awarded projects and customer contracts” and “In order to secure contracts for new projects, we typically face a long and variable selling cycle that requires significant resource commitments and requires a long lead time before we realize revenues” in Item 1A, Risk Factors in our 2021 Annual Report.

### Assets in Development

Assets in development, which represents the potential design/build project value of small-scale renewable energy plants that have been awarded or for which we have secured development rights, were estimated at $1.3 billion and $1.1 billion at March 31, 2022 and 2021, respectively. The portion of that total related to spending for Energy as a Service assets was approximately $60.0 million and $70.0 million at March 31, 2022 and 2021, respectively. This is another important metric because it helps us gauge our future capacity to generate electricity or deliver renewable gas fuel which contributes to our recurring revenue stream.

### Results of Operations

The following tables set forth certain financial data from the condensed consolidated statements of income for the periods indicated:

*(In Thousands)*

|  | Three Months Ended March 31, 2022 Amount | % of Revenues | 2021 Amount | % of Revenues | Year-Over-Year Change Dollar Change | % Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Revenues | $474,002 | 100.0% | $252,202 | 100.0% | $221,800 | 87.9% |
| Cost of revenues | 405,624 | 85.6% | 205,293 | 81.4% | 200,331 | 97.6% |
| Gross profit | 68,378 | 14.4% | 46,909 | 18.6% | 21,469 | 45.8% |
| Selling, general and administrative expenses | 39,692 | 8.4% | 28,601 | 11.3% | 11,091 | 38.8% |
| Operating income | 28,686 | 6.1% | 18,308 | 7.3% | 10,378 | 56.7% |
| Other expenses, net | 7,081 | 1.5% | 3,672 | 1.5% | 3,409 | 92.8% |
| Income before income taxes | 21,605 | 4.6% | 14,636 | 5.8% | 6,969 | 47.6% |
| Income tax (benefit) provision | 2,307 | 0.5% | 2,205 | 0.9% | 102 | 4.6% |
| Net income | 19,298 | 4.1% | 12,431 | 4.9% | $6,867 | 55.2% |
| Net (income) loss attributable to redeemable non-controlling interest | (1,914) | (0.4)% | (1,257) | (0.5)% | (657) | (52.3)% |
| Net income attributable to common shareholders | $17,384 | 3.7% | $11,174 | 4.4% | $6,210 | 55.6% |

All financial result comparisons made below are against the same prior year period unless otherwise noted.

Our results of operations for the three months ended March 31, 2022 are due to the following:

- ***Revenues:*** total revenues for the three months ended March 31, 2022 increased over 2021 primarily due to a $212.7 million, or 118%, increase in our project revenues primarily attributed to the timing of revenue recognized as a result of the phase of active projects versus the prior year, including our SCE battery storage project, a $5.1 million, or 15%, increase in our energy asset revenue attributed to the continued growth of our operating portfolio, strong renewable gas production, and higher pricing on renewable identification numbers (“RINs”) generated from certain non-solar distributed generation assets in operation and a $1.8 million increase in O&M revenue.
- ***Cost of Revenues and Gross Profit:*** the increase in cost of revenues is primarily due to the increase in project revenues described above. Gross profit increased due to increased revenue, however, our gross profit as a percent of revenues decreased due to the lower margin on our SCE battery storage project.
- ***Selling, General and Administrative Expenses (“SG&A”):*** SG&A expenses for the three months ended March 31, 2022 increased over 2021 primarily due to higher net salaries and benefits of $7.3 million as a result of increased headcount and an increase in non-cash stock compensation expense. The increase is also attributed to higher miscellaneous expenses related to a settlement of an outstanding legal proceeding.
- ***Other Expenses, Net:*** Other expenses, net, includes gains and losses from derivatives transactions, foreign currency transactions, interest expense, interest income, amortization of financing costs and certain government incentives. Other expenses, net for the three months ended March 31, 2022 increased over 2021 primarily due to a loss on derivatives of $1.6 million compared to a gain of $0.4 million in the prior year and higher interest expenses of $1.7 million related to an increase in amounts outstanding on our senior secured debt facility.
- ***Income before Income Taxes:*** the increase in income before income taxes is due to reasons described above.
- ***Income Tax (Benefit) Provision:*** the provision for income taxes is based on various rates set by federal, state, provincial and local authorities and is affected by permanent and temporary differences between financial accounting and tax reporting requirements. The effective tax rate was lower in 2022 as compared to 2021 primarily due to higher investments in solar projects eligible for the investment tax credit, higher availability of the Section 179D deduction on energy improvements on government owned buildings, and higher compensation deductions related to employee stock option exercises.
- ***Net Income and Earnings Per Share:*** Net income attributable to common shareholders increased due to the reasons described above. Basic earnings per share for the three months ended March 31, 2022 was $0.34, an increase of $0.11 per share compared to the same period of 2021. Diluted earnings per share for 2022 was $0.32, a decrease of $0.10 per share compared to last year.

### Business Segment Analysis

Our reportable segments for the three months ended March 31, 2022 were U.S. Regions, U.S. Federal, Canada, Non-Solar DG and All Other. On January 1, 2022, we changed the structure of our internal organization and our “All Other” segment now includes our U.S.-based enterprise energy management services previously included in our U.S Regions segment and our U.S. Regions segment now includes U.S. project revenue and associated costs previously included in our Non-Solar DG segment. As a result, previously reported amounts have been reclassified for comparative purposes. These segments do not include results of other activities, such as corporate operating expenses not specifically allocated to the segments. See Note 16 “Business Segment Information” for additional information about our segments.

### Revenues

*(In Thousands)*

|  | Three Months Ended March 31, 2022 | 2021 | Dollar Change | % Change |
| --- | ---: | ---: | ---: | ---: |
| U.S. Regions | $314,520 | $89,244 | $225,276 | 252.4% |
| U.S. Federal | 75,646 | 102,214 | (26,568) | (26.0) |
| Canada | 17,172 | 11,643 | 5,529 | 47.5 |
| Non-Solar DG | 29,261 | 25,580 | 3,681 | 14.4 |
| All Other | 37,403 | 23,521 | 13,882 | 59.0 |
| Total revenues | $474,002 | $252,202 | $221,800 | 87.9% |

All revenue comparisons made below relate to the three-month period and are against the same prior year period unless otherwise noted.

- ***U.S. Regions:*** the increase is primarily due to a $222.8 million increase in project revenue attributable to the timing of revenue recognized as a result of the phase of active projects, including our SCE battery storage projects, versus the prior year, and higher energy asset revenue attributed to the growth and performance of our solar asset portfolio.
- ***U.S. Federal:*** the decrease is primarily due to a $27.9 million decrease in project revenue due to the timing of revenue recognized as a result of the phase of active projects which were impacted by supply chain delays.
- ***Canada:*** the increase is primarily due to a $5.0 million increase in project revenues attributable to the timing of revenue recognized as a result of the phase of active projects versus the prior year.
- ***Non-Solar DG:*** the increase is primarily attributed to higher energy asset revenues of $3.5 million resulting from the continued growth of our operating portfolio, increased renewable gas production levels and higher pricing on RINs generated from certain non-solar distributed generation assets in operation.
- ***All Other:*** All other revenues increased over 2021 primarily due to a $12.8 million increase in project revenues as a result of the phase of active projects versus the prior year and a $2.2 million increase in integrated-PV revenue.

### Income before Taxes and Unallocated Corporate Activity

*(In Thousands)*

|  | Three Months Ended March 31, 2022 | 2021 | Dollar Change | % Change |
| --- | ---: | ---: | ---: | ---: |
| U.S. Regions | $18,218 | $3,239 | $14,979 | 462.5% |
| U.S. Federal | 8,886 | 12,030 | (3,144) | (26.1) |
| Canada | 279 | (85) | 364 | (428.2) |
| Non-Solar DG | 7,422 | 8,772 | (1,350) | (15.4) |
| All Other | 2,709 | 1,645 | 1,064 | 64.7 |
| Unallocated corporate activity | (15,909) | (10,965) | $(4,944) | (45.1) |
| Income before taxes | $21,605 | $14,636 | $6,969 | 47.6% |

All income before taxes and unallocated corporate activity comparisons made below relate to the three month period and are against the same prior year period unless otherwise noted.

- ***U.S. Regions:*** the increase is primarily due to the increase in revenues described above, partially offset by higher salaries and benefits and other expenses.
- ***U.S. Federal:*** the decrease is primarily due to the decrease in revenues described above.
- ***Canada:*** the increase is primarily due to the increase in revenue described above, partially offset by higher salaries and benefits.
- ***Non-Solar DG:*** the decrease is primarily due to the higher mark to market losses on derivatives and higher interest expenses.
- ***All Other:*** the increase is primarily due to the increase in revenues described above.
- Unallocated corporate activity includes all corporate level selling, general and administrative expenses and other expenses not allocated to the segments. We do not allocate any indirect expenses to the segments. Corporate activity increased primarily due to higher net salaries and benefit costs and increased professional fees, partially offset by lower interest expenses.

### Liquidity and Capital Resources

### Overview

Since inception, we have funded operations primarily through cash flow from operations, advances from Federal ESPC projects, our senior secured credit facility, and various forms of other debt. In addition, in March 2021, we completed an underwritten public offering of 2,875,000 shares of our Class A Common Stock, for total net proceeds of $120.1 million. See Note 7 “Debt and Financing Lease Liabilities” for additional information.

Working capital requirements, which can be susceptible to fluctuations during the year due to seasonal demands, generally result from revenue growth, our solar equipment purchase patterns, the timing of funding under various contracts, or advances from Federal ESPC projects, and payment terms for receivables and payables.

We expect to incur additional expenditures in connection with the following activities:

- equity investments, project asset acquisitions and business acquisitions that we may fund from time to time
- capital investment in current and future energy assets
- material, equipment, and other expenditures for our SCE battery storage project, particularly during the first half of 2022

We regularly monitor and assess our ability to meet funding requirements. We believe that cash and cash equivalents, working capital and availability under our revolving senior secured credit facility, combined with our right (subject to lender consent) to increase our revolving credit facility by $100.0 million, and our general access to credit and equity markets, will be sufficient to fund our operations through at least May 2023 and thereafter. We expect to fund significant working capital expenditures for our SCE battery storage project. However, we continue to evaluate and take action, as necessary, to preserve adequate liquidity and ensure that our business can continue to operate and that we can meet our capital requirements during these uncertain times. This may include limiting discretionary spending across the organization and re-prioritizing our capital projects amid times of political unrest, the evolution of the COVID-19 pandemic, the duration of supply challenges, and the rate and duration of the inflationary pressures.

### Sources of Liquidity

#### Senior Secured Credit Facility

On March 4, 2022, we entered into the fifth amended and restated senior secured credit facility, which increased the aggregate amount of total commitments from $245.0 million to $495.0 million. This amendment increased the aggregate amount of the revolving commitments from $180.0 million to $200.0 million, increased the existing term loan A to $75.0 million, and extended the maturity date of the revolving commitment and term loan A from June 28, 2024 to March 4, 2025. In addition, it added a delayed draw term loan A for up to $220.0 million through a September 4, 2023 maturity date, increased the total funded debt to EBITDA covenant ratio from a maximum of 3.50 to 4.50 for the quarter ended March 31, 2022; 4.25 for the quarter ending June 30, 2022, 4.00 for the quarters ending September 30, 2022 and December 31, 2022; and 3.50 thereafter. The amendment also specified the debt service coverage ratio to be less than 1.5 and increased our limit under an energy conversation project financing to $650.0 million, which provides us with flexibility to grow our federal business further. As of March 31, 2022, the balance on the senior secured term loans was $275.0 million, the balance on the senior secured revolving credit facility was $121.0 million, and we had funds available of $47.3 million.

#### Project Financing

We have entered into a number of construction and term loan agreements for the purpose of constructing and owning certain renewable energy plants. While we are required under generally accepted accounting principles (“GAAP”) to reflect these loans as liabilities on our consolidated balance sheets, they are generally non-recourse and not direct obligations of Ameresco, Inc. As of March 31, 2022, our construction and term loans outstanding were $237.2 million, and we had funds of $98.1 million available for borrowing under two of these non-recourse construction revolvers.

On April 29, 2022, a wholly-owned subsidiary of ours executed a joinder agreement to the 1.74% construction revolver, which added it as an additional borrower under the master construction loan agreement, and at closing, we borrowed $9.8 million for a solar and storage project.

We also utilize long-term financing facilities, accounted for as failed sale leasebacks, to finance our solar PV energy assets. During the three months ended March 31, 2022, we sold and leased back energy assets for $12.6 million in cash under our two long-term financing facilities and at March 31, 2022, approximately $231.9 million remained available under these lending commitments. This long-term financing facilities expire in June 30, 2022 and July 15, 2022.

### Cash Flows

The following table summarizes our cash flows from operating, investing and financing activities:

*(In Thousands)*

|  | Three Months Ended March 31, 2022 | 2021 | $ Change |
| --- | ---: | ---: | ---: |
| Cash flows from operating activities | $(276,122) | $(38,724) | $(237,398) |
| Cash flows from investing activities | (57,733) | (56,479) | (1,254) |
| Cash flows from financing activities | 355,400 | 112,383 | 243,017 |
| Effect of exchange rate changes on cash | (196) | 330 | (526) |
| Total net cash flows | $21,349 | $17,510 | $3,839 |

Our service offering also includes the development, construction, and operation of small-scale renewable energy plants. Small-scale renewable energy projects, or energy assets, can either be developed for the portfolio of assets that we own and operate or designed and built for customers. Expenditures related to projects that we own are recorded as cash outflows from investing activities. Expenditures related to projects that we build for customers are recorded as cash outflows from operating activities as cost of revenues.

#### Cash Flows from Operating Activities

Our cash flows from operating activities decreased from last year primarily due to an increase of $160.9 million in unbilled revenue (costs and estimated earnings in excess of billings) due to the timing of when certain projects are invoiced, including our SCE battery storage project, a decrease of $57.8 million in accounts payable, accrued expenses and other current liabilities, and a $56.4 million increase in accounts receivable when compared to the prior year period.

#### Cash Flows from Investing Activities

During the three months ended March 31, 2022 we invested $56.8 million in purchases of energy assets compared to $55.8 million in 2021.

We currently plan to invest approximately $170 million to $220 million in additional capital expenditures during the remainder of 2022, principally for the construction or acquisition of new renewable energy plants, the majority of which we expect to fund with project finance debt.

#### Cash Flows from Financing Activities

Our primary sources of financing for the three months ended March 31, 2022 were gross proceeds from long-term debt of $286.7 million, net proceeds from our senior secured revolver of $76.0 million, and net proceeds received from Federal ESPC projects and energy assets of $66.7 million, partially offset by payments on long-term debt of $77.4 million.

Our primary sources of financing for the three months ended March 31, 2021 were net proceeds from our equity offering of $120.2 million, net proceeds received from Federal ESPC projects and energy assets of $33.5 million, net proceeds from long-term debt financings of $30.8 million, partially offset by net payments from our senior secured credit facility of $53.1 million, and payments on long-term debt of $19.1 million.

We currently plan additional project financings of approximately $160 million to $205 million during the remainder of 2022 to fund the construction or the acquisition of new renewable energy plants as discussed above.

### Critical Accounting Policies and Estimates

Preparing our consolidated financial statements in accordance with GAAP involves us making estimates and assumptions that affect reported amounts of assets and liabilities, net sales and expenses, and related disclosures in the accompanying notes at the date of our financial statements. We base our estimates on historical experience, industry and market trends, and on various other assumptions that we believe to be reasonable under the circumstances. However, by their nature, estimates are subject to various assumptions and uncertainties, and changes in circumstances could cause actual results to differ from these estimates, sometimes materially.

### Income Taxes

We have reviewed all tax positions taken as of March 31, 2022 and there were no additional uncertain tax positions taken during the three months ended March 31, 2022. We believe our current tax reserves are adequate to cover all known tax uncertainties.

Other than as noted above, there have been no material changes in our critical accounting estimates from those disclosed in Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations of our 2021 Form 10-K. In addition, refer to Note 2 “Summary of Significant Accounting Policies” for updates to critical accounting policies.

### Recent Accounting Pronouncements

See Note 2, “Summary of Significant Accounting Policies” for a discussion of recent accounting pronouncements.

## Market risk

As filed, 202 characters.

As of March 31, 2022, there have been no significant changes in market risk exposures that materially affected the quantitative and qualitative disclosures as described in Item 7A to our 2021 Form 10-K.

## Controls and procedures

As filed, 2,018 characters.

### Evaluation of Disclosure Controls and Procedures

Our management, with the participation of our principal executive officer and principal financial officer, evaluated the effectiveness of our disclosure controls and procedures, as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act, as of the end of the period covered by this quarterly report, or the evaluation date. Disclosure controls and procedures are designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms. Our management recognizes that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving their objectives, and management necessarily applies its judgment in evaluating the cost-benefit relationship of possible controls and procedures. Our management, after evaluating the effectiveness of our disclosure controls and procedures as of the evaluation date, concluded that as of the evaluation date, our disclosure controls and procedures were effective at a reasonable assurance level.

### Changes in Internal Control over Financial Reporting

During the three months ended March 31, 2022, we implemented a new Enterprise Resource Planning (“ERP”) system. In connection with this ERP implementation, we are updating and will continue to update our internal control over financial reporting, as necessary, to accommodate modifications to our business processes and accounting procedures. We do not believe this implementation has had or will have a material adverse effect on our internal control over financial reporting.

Except as disclosed above, there were no changes in our internal control over financial reporting during our most recent fiscal quarter that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 9,880 characters.

*Our business is subject to numerous risks, a number of which are described below and under “Risk Factors” in Part I, Item 1A of our 2021 Annual Report.*

*You should carefully consider these risks together with the other information set forth in this report, which could materially affect our business, financial condition and future results. The risks described in Part I, Item 1A of our 2021 Annual Report and below are not the only risks we face. Risks and uncertainties not currently known to us or that we currently deem to be immaterial also may materially adversely affect our business, financial condition and operating results.*

***We may be impacted by macroeconomic conditions such as supply chain challenges, a shortfall of certain products needed for our business, and inflationary pressures.***

Global trade conditions that originated during the COVID-19 pandemic continue to persist and have been exacerbated by the war in Ukraine. These conditions may also have long-lasting adverse impact on us and our industries independently of the progress of the pandemic. For example, pandemic-related issues have exacerbated port congestion and intermittent supplier shutdowns and delays, resulting in additional expenses to expedite delivery of critical equipment. These conditions, combined with an increased demand for certain products needed for our business, such as lithium-ion battery cells and solar panels has created a shortfall of and increased costs for these products, which has caused challenges and delays in our projects and may impact the profitability of our projects. We cannot predict the duration or direction of current global trends or their sustained impact. If we experience unfavorable global market conditions, our business, prospects, financial condition, and operating results may be harmed.

***The loss of SCE, which is one of our most significant customers, or our failure to perform on our contract with SCE in accordance with its terms could adversely affect us.***

We expect that a material portion of our revenue for 2022 will be generated from the SCE Agreement. The SCE Agreement and related purchase orders obligate us to achieve certain substantial completion milestone dates (as they may be extended) for the facilities no later than August 1, 2022, and for at least two years thereafter meet specified availability and capacity guarantees. As a result of COVID-19 shutdowns and newly implemented Chinese transportation safety policies resulting in delays in the batteries needed for the project, we have provided a force majeure notice to SCE. Certain events, such as delays due to COVID-19 constitute force majeure events under the SCE Agreement and, subject to the party that is claiming a force majeure event being in compliance with its obligations, allows for the extension of the August 1, 2022 completion date. The SCE Agreement also requires us to expend significant capital, and if we are unable to fund such capital needs on acceptable terms, on a timely basis, or at all, this could adversely impact the construction timeline under the agreement. If we fail to satisfy certain milestone obligations, fail to come to an agreement with SCE of appropriate extensions of these milestones or fail to meet the availability and capacity guarantees, we may be subject to liquidated damages and under certain circumstances SCE may have a right to terminate the agreement. The requirement to pay liquidated damages or the loss of business from SCE could have a material adverse effect on our reputation, business or results of operations.

***Our business depends in part on federal, state, provincial, and local government support for energy efficiency and renewable energy, and a decline in such support or the imposition of additional taxes, tariffs, duties or other assessments on renewable energy or the equipment necessary to generate or deliver it, could harm our business.***

We depend in part on legislation and government policies that support energy efficiency and renewable energy projects that enhance the economic feasibility of our energy efficiency services and small-scale renewable energy projects. This support includes legislation and regulations that authorize and regulate the manner in which certain governmental entities do business with us; encourage or subsidize governmental procurement of our services; encourage or in some cases require other customers to procure power from renewable or low-emission sources, to reduce their electricity use or otherwise to procure our services; and provide us with tax and other incentives that reduce our costs or increase our revenues. In addition, the U.S. government generally has not taken action to materially burden the international supply chain, which has been important to the development of renewable energy facilities at acceptable prices. Any reductions or modifications to, or the elimination of, governmental incentives or policies that support renewable energy or the imposition of additional taxes, tariffs, duties or other assessments on renewable energy or the equipment necessary to generate or deliver it, such as antidumping and countervailing duty rates that could be put in place as a result of the U.S. Department of Commerce's investigation into an antidumping and countervailing duties circumvention claim on solar cells and panels supplied from Malaysia, Vietnam, Thailand and Cambodia could result in, among other things, the lack of a satisfactory market for the development and/or financing of renewable energy projects, or adversely impact our ability to complete projects for existing customers and obtain project commitments from new customers. Due to the uncertainty in the regulatory and legislative processes, we cannot determine the effect any such legislation and regulation may have on our products and operations

***Failure of third parties to manufacture quality products or provide reliable services in a timely manner or at prices that are acceptable to us could cause delays in the delivery of our services and completion of our projects, which could damage our reputation, have a negative impact on our relationships with our customers and adversely affect our growth.***

Our success depends on our ability to provide services and complete projects in a timely manner, which in part depends on the ability of third parties to provide us with timely and reliable products and services at acceptable prices. In providing our services and completing our projects, we rely on products that meet our design specifications and components manufactured and supplied by third parties, as well as on services performed by subcontractors. We also rely on subcontractors to perform substantially all of the construction and installation work related to our projects; and we often need to engage subcontractors with whom we have no experience for our projects. We, our subcontractors and other third parties have been impacted by the global supply chain delays as well as quarantine and other restrictions imposed because of the COVID-19 pandemic. This has resulted in and may continue to result in delays in our ability to provide our services and complete our projects in a timely manner. In addition, some of the third parties we engage for our design, construction and operation projects operate internationally and our reliance on their products and services may be impacted by economic, political, and labor conditions in those regions as well as the uncertainty caused by the evolving relations between the United States and these regions, including China.

For example, we are dependent on the continued supply of lithium-ion battery cells for our energy storage products, and we will require substantially more cells to grow our battery storage business based on our current plans. Currently, we rely on limited number of suppliers for these cells. Any disruption in the supply of battery cells from our suppliers could limit our growth for projects involving battery energy storage. In addition, the cost and mass production of battery cells, depends in part upon the prices and availability of raw materials such as lithium, nickel, cobalt and/or other metals. The prices for these materials fluctuate and their available supply may be unstable, depending on market conditions and global demand for these materials. As a result of increased global production of energy storage products and electric vehicles, suppliers of these raw materials may be unable to meet our volume or timing needs. Any reduced availability of these materials may adversely impact our access to battery cells and our growth, and any increases in their prices may reduce our profitability if we cannot recoup such costs in our project pricing. Moreover, our inability to meet demand may harm our brand, growth, prospects and operating results.

If any of our subcontractors are unable to provide services that meet or exceed our customers’ expectations or satisfy our contractual commitments, our reputation, business and operating results could be harmed. In addition, if we are unable to avail ourselves of warranty and other contractual protections with providers of products and services, we may incur liability to our customers or additional costs related to the affected products and components, which could have a material adverse effect on our business, financial condition, and operating results. Moreover, any delays, malfunctions, inefficiencies, or interruptions in these products or services could adversely affect the quality and performance of our solutions and require considerable expense to establish alternate sources for such products and services. This could cause us to experience difficulty retaining current customers and attracting new customers, and could harm our brand, reputation, growth, and operating results.

Filed May 3, 2022.
Source: SEC EDGAR, the filing index for accession 0001488139-22-000072. Last ingested by Listed: Nov 10, 2026, 04:22 ET. No prices; not investment advice.