# Ameresco, Inc.: Form 10-Q for the period ended Sep 30, 2022

- Company: [Ameresco, Inc.](/companies/amrc.md) (CIK 1488139)
- Form: 10-Q
- Filed: 2022-11-01
- Accepted by EDGAR: Nov 1, 2022, 17:14 ET
- Period: 2022-09-30
- Accession: 0001488139-22-000107
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1488139/000148813922000107/amrc-20220930.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1488139/000148813922000107/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2022-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2022-07-01 to 2022-09-30 | $441.3m | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Revenue | 9 months, 2022-01-01 to 2022-09-30 | $1.49bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 3 months, 2022-07-01 to 2022-09-30 | $361.7m | us-gaap:CostOfGoodsAndServicesSold |
| Cost of revenue | 9 months, 2022-01-01 to 2022-09-30 | $1.26bn | us-gaap:CostOfGoodsAndServicesSold |
| Gross profit | 3 months, 2022-07-01 to 2022-09-30 | $79.6m | us-gaap:GrossProfit |
| Gross profit | 9 months, 2022-01-01 to 2022-09-30 | $229.2m | us-gaap:GrossProfit |
| Selling, general and administrative | 3 months, 2022-07-01 to 2022-09-30 | $40.6m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Selling, general and administrative | 9 months, 2022-01-01 to 2022-09-30 | $118.6m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months, 2022-07-01 to 2022-09-30 | $38.9m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2022-01-01 to 2022-09-30 | $110.7m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2022-07-01 to 2022-09-30 | $3.7m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2022-01-01 to 2022-09-30 | $10.9m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2022-07-01 to 2022-09-30 | $27.4m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2022-01-01 to 2022-09-30 | $77.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2022-07-01 to 2022-09-30 | $0.51 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2022-01-01 to 2022-09-30 | $1.44 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2022-07-01 to 2022-09-30 | $0.53 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2022-01-01 to 2022-09-30 | $1.48 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2022-07-01 to 2022-09-30 | 53,297,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2022-01-01 to 2022-09-30 | 53,252,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2022-01-01 to 2022-09-30 | −$273.2m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 9 months, 2022-01-01 to 2022-09-30 | $4.0m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2022-09-30 | $122.5m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2022-09-30 | $1.09bn | us-gaap:AssetsCurrent |
| Total assets | at 2022-09-30 | $3.04bn | us-gaap:Assets |
| Current liabilities | at 2022-09-30 | $860.3m | us-gaap:LiabilitiesCurrent |
| Current portion of debt | at 2022-09-30 | $301.2m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2022-09-30 | $797.7m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 48,127 characters.

*You should read the following discussion and analysis of our financial condition and results of operations together with our unaudited condensed consolidated financial statements and the related notes thereto included in Part I, Item 1 of this Quarterly Report on Form 10-Q and the audited consolidated financial statements and notes thereto and management’s discussion and analysis of financial condition and results of operations for the year ended December 31, 2021 included in our Annual Report on Form 10-K (“2021 Form 10-K”) for the year ended December 31, 2021 filed on March 1, 2022 with the U.S. Securities and Exchange Commission (“SEC”). This Quarterly Report on Form 10-Q contains “forward-looking statements” within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). Forward looking statements include statements regarding our strategy, future operations, future financial position, future revenues, projected costs, prospects, plans, objectives of management, expected market growth and other characterizations of future events or circumstances. All statements, other than statements of historical fact, including statements that refer to our expectations as to the future growth of our business and associated expenses; our expectations as to revenue generation; the future availability of borrowings under our revolving credit facility; the expected future growth of the market for energy efficiency and renewable energy solutions; our backlog, awarded projects and recurring revenue and the timing of such matters; our expectations as to acquisition activity; the impact of any restructuring; the uses of future earnings; our intention to repurchase shares of our Class A common stock; the expected energy and cost savings of our projects; the expected energy production capacity of our renewable energy plants; the impact of the ongoing COVID-19 pandemic and supply chain disruptions and shortage of materials; our expectations related to our agreement with SCE including the impact of any delays; the impact of the U.S. Department of Commerce’s solar panel import investigation and other characterizations of future events or circumstances are forward-looking statements. Forward looking statements are often, but not exclusively, identified by the use of words such as “may,” “will,” “expect,” “believe,” “anticipate,” “intend,” “could,” “estimate,” “target,” “project,” “predict” or “continue,” and similar expressions or variations. These forward-looking statements are based on current expectations and assumptions that are subject to risks, uncertainties and other factors that could cause actual results and the timing of certain events to differ materially and adversely from future results expressed or implied by such forward-looking statements. Risks, uncertainties and factors that could cause or contribute to such differences include, but are not limited to, those discussed in the section titled “Risk Factors,” set forth in Part I, Item 1A of our 2021 Form 10-K, Part II, Item 1A of our Quarterly Report on Form 10-Q for the quarter ended March 31, 2022 and elsewhere in this Quarterly Report on Form 10-Q (“Q1 2022 Form 10-Q”). Subsequent events and developments may cause our views to change. However, while we may elect to update these forward-looking statements at some point in the future, we have no current intention of doing so and undertake no obligation to do so except to the extent required by applicable law. You should, therefore, not rely on these forward-looking statements as representing our views as of any date subsequent to the date of this Quarterly Report on Form 10-Q.*

### Overview

Ameresco is a leading clean technology integrator with a comprehensive portfolio of energy efficiency and renewable energy supply solutions. We help organizations meet energy savings and energy management challenges with an integrated comprehensive approach to energy efficiency and renewable energy. Leveraging budget neutral solutions, including energy savings performance contracts (“ESPCs”) and power purchase agreements (“PPAs”), we aim to eliminate the financial barriers that traditionally hamper energy efficiency and renewable energy projects.

Drawing from decades of experience, Ameresco develops tailored energy management projects for its customers in the commercial, industrial, local, state, and federal government, K-12 education, higher education, healthcare, public housing sectors, and utilities.

We provide solutions primarily throughout North America and the U.K. and our revenues are derived principally from energy efficiency projects, which entail the design, engineering, and installation of equipment and other measures that incorporate a range of innovative technology and techniques to improve the efficiency and control the operation of a facility’s energy infrastructure; this can include designing and constructing a central plant or cogeneration system for a customer providing power, heat and/or cooling to a building, or other small-scale plant that produces electricity, gas, heat or cooling from renewable sources of energy. We also derive revenue from long-term O&M contracts, energy supply contracts for renewable energy operating assets that we own, integrated-PV, and consulting and enterprise energy management services.

In addition to organic growth, strategic acquisitions of complementary businesses and assets have been an important part of our growth enabling us to broaden our service offerings and expand our geographical reach. In December 2021, we completed the acquisition of Plug Smart, an Ohio-based energy services company that specializes in the development and implementation of budget neutral capital improvement projects including building controls and building automation systems. This acquisition allowed us to expand our existing pipeline and solution offerings in the smart buildings sector. The pro forma effects of this acquisition were not material to our operations for the fiscal periods presented.

### Key Factors and Trends

### The Southern California Edison (“SCE”) Agreement

In October 2021, we entered into a contract with SCE to design and build three grid scale battery energy storage systems (“BESS”) at three sites near existing substation parcels throughout SCE’s service territory in California with an aggregate capacity of 537.5 MW (“the SCE Agreement”). The engineering, procurement and construction price is approximately $892.0 million, in the aggregate, including two years of O&M revenues, subject to customary potential adjustments for changes in the work. The SCE Agreement requires substantial completion of all facilities, subject to extension for specified force majeure events and customer-caused delays, to be completed no later than August 1, 2022 (the “Guaranteed Completion Date”). If we fail to meet the Guaranteed Completion Date at any of the facilities, we may be required to pay liquidated damages up to an aggregate maximum of $89 million, and under certain circumstances SCE may have a right to terminate the agreement. We have also provided availability and capacity guarantees under the SCE Agreement, failure of which entitles the customer to liquidated damages. Under the SCE Agreement, the occurrence of force majeure events, including certain COVID-related delays, results in extensions of required completion deadlines without liquidated damages and an increase in the contract price, subject to the party claiming a force majeure event being in compliance with its contractual obligations. As previously disclosed, we have made force majeure claims under the agreement as battery supply delays resulting from COVID-19 lockdowns in several regions around China, newly implemented Chinese transportation safety policies and related supply chain delays impacted our ability to achieve the Guaranteed Completion Date on August 1, 2022.

Despite these delays, the SCE projects continued to progress during the quarter ended September 30, 2022, with all battery cells and containers on site and early commissioning steps underway. SCE recently instructed us to adjust the project schedule into 2023. Under the terms of the SCE Agreement, we are entitled to recover costs associated with this SCE requested change. We are working with SCE to analyze and estimate these costs. We are also continuing discussions with SCE regarding the applicability and scope of any force majeure relief based on the force majeure notices we have delivered to SCE and the impact the schedule adjustments requested by SCE may have on the overall project schedule and our force majeure claims.

Considering the schedule adjustments requested by SCE and the delays disclosed earlier, we anticipate the projects to be in service and achieve substantial completion prior to the summer of 2023. However, we expect a majority of our revenues under this contract to be recognized in 2022 based upon expected costs incurred in 2022 relative to total expected costs on this project.

### COVID-19, Supply Chain Disruptions, and Other Global Factors

We continue to monitor the impact of COVID-19 and general global economic conditions on our operations, financial results, and liquidity. The impact to our future operations and results, however, remains uncertain and will depend on a number of factors, including, but not limited to, the emergence and spread of more transmissible variants, the overall duration and severity of the pandemic, and its impact on the global economy, our customers, and business and workforce disruptions. Infection rates and regulations continue to fluctuate in various regions and there are ongoing global impacts resulting from the pandemic that may persist, including challenges and increases in costs for logistics and supply chains, such as increased port congestion, and intermittent supplier delays as well as shortage of certain components needed for our business, such as lithium-ion battery cells, semiconductors, and other components required for our clean energy solutions.

During the three and nine months ended September 30, 2022, we were impacted by supply chain disruptions and varying levels of inflation, as a result of COVID-19 and macroeconomic conditions, causing delays in the timely delivery of material to customer sites and delays and disruptions in the completion of certain projects, including those pursuant to the SCE Agreement, and increased shipping and transportation costs, as well as increased component and labor costs. This negatively impacted our results of operations during the three and nine months ended September 30, 2022. We expect the trends of supply challenges and inflationary pressures to continue for the remainder of this year and thereafter. We continue to monitor macroeconomic conditions to remain flexible and to optimize and evolve our business as appropriate to address the challenges presented from these conditions. For example, in April 2022, we entered into a framework agreement term sheet with a battery manufacturer for the purchase and sale of BESS equipment for our BESS projects at committed amounts and agreed upon delivery dates for a period of several years. The purchase and sale commitment covers BESS equipment to be used for our BESS projects and assets. In connection with entering into the term sheet, we paid a $10 million deposit which will be credited against our future equipment purchases.

On April 1, 2022, the U.S. Department of Commerce (“Commerce”) initiated an investigation to determine whether imports of crystalline silicon photovoltaic cells and modules which are manufactured in Cambodia, Thailand, Vietnam, or Malaysia using components from China are circumventing existing anti-dumping (“ADD”) and countervailing duties (“CVD”) on solar cells and modules from China. The full investigation is estimated to take 365 days. In June 2022 President Biden announced an executive action which guaranteed that any duties that could be levied as a result of this investigation, will not be imposed on imports by

U.S importers between June 2022 and June 2024. Based on this action, and as we have an existing inventory of solar panels from a large purchase several years ago, we do not expect that this investigation will have a material impact on our business in the near term. However, any resulting duties imposed may disrupt the solar panel supply chain, increase the cost for solar cells and panels, and ultimately impact the demand for clean energy solutions. We are closely monitoring the investigation and any regulations issued by Commerce.

The Inflation Reduction Act (“IRA”) was signed into law by President Biden on August 16, 2022. The bill invests nearly $369 billion in energy and climate policies. The provisions of the IRA are intended to, among other things, incentivize domestic clean energy investment, manufacturing, and deployment. The IRA incentivizes the deployment of clean energy technologies by extending and expanding federal incentives such as the Investment Tax Credit (“ITC”) and the Production Tax Credit (“PTC”). We view the enactment of the IRA as favorable for the overall business climate for the renewable energy industry, however, we are continuing to evaluate the overall impact and applicability of the IRA to our current and planned projects, and we may experience a delay in our sales cycles and new award activity as our customers consider the applicability of the IRA.

### Climate Change and Effects of Seasonality

The global energy challenges and emphasis on climate change and reducing carbon emissions has created opportunities for our industry. Sustainability has been at the forefront of our business since its inception, and we are committed to staying at the leading edge of innovation taking place in the energy sector. We believe the next decade will be marked by dramatic changes in the power infrastructure with resources shifting to more distributed assets, storage, and microgrids to increase overall reliability and resiliency. The sustainability efforts are impacted by regulations, and changes in the regulatory climate may impact the demand for our products and offerings. For example, we have taken advantage of Investment Tax Credits for certain of our projects. See “Our business depends in part on federal, state, provincial and local government support for energy efficiency and renewable energy, and a decline in such support could harm our business” in Item 1A, Risk Factors of our Q1 2022 Form 10-Q and “Compliance with environmental laws could adversely affect our operating results” in Item 1A, Risk Factors of our 2021 Form 10-K.

Climate change also brings risks, as the impacts have caused us to experience more frequent and severe weather interferences, and this trend may continue. We are subject to seasonal fluctuations and construction cycles, particularly in climates that experience colder weather during the winter months, such as the northern United States and Canada, and climates that experience extreme weather events, such as wildfires, storms or flooding, hurricanes, or at educational institutions, where large projects are typically carried out during summer months when their facilities are unoccupied. In addition, government customers, many of which have fiscal years that do not coincide with ours, typically follow annual procurement cycles and appropriate funds on a fiscal-year basis even though contract performance may take more than one year. Further, government contracting cycles can be affected by the timing of, and delays in, the legislative process related to government programs and incentives that help drive demand for energy efficiency and renewable energy projects. As a result, our revenues and operating income in the third and fourth quarter are typically higher, and our revenues and operating income in the first quarter are typically lower, than in other quarters of the year, however, this may become harder to predict with the potential effects of climate change. As a result of such fluctuations, we may occasionally experience declines in revenues or earnings as compared to the immediately preceding quarter, and comparisons of our operating results on a period-to-period basis may not be meaningful.

Our annual and quarterly financial results are also subject to significant fluctuations as a result of other factors, many of which are outside our control.

### Stock-based Compensation

During the nine months ended September 30, 2022, we granted 1,585,500 common stock options to certain employees under our 2020 Stock Incentive Plan. As a result, our unrecognized stock-based compensation expense increased from $41.1 million at December 31, 2021 to $47.9 million at September 30, 2022 and is expected to be recognized over a weighted-average period of three years. See Note 15 “Stock-based Compensation” for additional information.

### Backlog and Awarded Projects

Backlog is an important metric for us because we believe strong order backlogs indicate growing demand and a healthy business over the medium to long term, conversely, a declining backlog could imply lower demand.

The following table presents our backlog:

*(In Thousands)*

| Project Backlog | As of September 30, 2022 | 2021 |
| --- | ---: | ---: |
| Fully-contracted backlog | $933,295 | $778,320 |
| Awarded, not yet signed customer contracts | 1,693,480 | 1,585,470 |
| Total project backlog | $2,626,775 | $2,363,790 |
| 12-month project backlog | $557,830 | $551,570 |
| **O&M Backlog** |  |  |
| Fully-contracted backlog | $1,245,790 | $1,115,420 |
| 12-month O&M backlog | $79,150 | $66,250 |

Our $892 million SCE Agreement was entered into in October 2021 and increased our fully-contracted backlog at September 30, 2022 compared to September 30, 2021, however, we expect the majority of our revenues under this contract to be recognized in 2022.

Total project backlog represents energy efficiency projects that are active within our sales cycle. Our sales cycle begins with the initial contact with the customer and ends, when successful, with a signed contract, also referred to as fully-contracted backlog. Our sales cycle recently has been averaging 18 to 42 months. Awarded backlog is created when a potential customer awards a project to Ameresco following a request for proposal. Once a project is awarded but not yet contracted, we typically conduct a detailed energy audit to determine the scope of the project as well as identify the savings that may be expected to be generated from upgrading the customer’s energy infrastructure. At this point, we also determine the subcontractors, what equipment will be used, and assist in arranging for third party financing, as applicable. Recently, awarded projects have been taking an average of 12 to 24 months to result in a signed contract and convert to fully-contracted backlog. It may take longer, as it depends on the size and complexity of the project. Historically, approximately 90% of our awarded backlog projects have resulted in a signed contract. After the customer and Ameresco agree to the terms of the contract and the contract is executed, the project moves to fully-contracted backlog. The contracts reflected in our fully-contracted backlog typically have a construction period of 12 to 36 months and we typically expect to recognize revenue for such contracts over the same period.

Our O&M backlog represents expected future revenues under signed multi-year customer contracts for the delivery of O&M services, primarily for energy efficiency and renewable energy construction projects completed by us for our customers.

We define our 12-month backlog as the estimated amount of revenues that we expect to recognize in the next twelve months from our fully-contracted backlog. See “We may not recognize all revenues from our backlog or receive all payments anticipated under awarded projects and customer contracts” and “In order to secure contracts for new projects, we typically face a long and variable selling cycle that requires significant resource commitments and requires a long lead time before we realize revenues” in Item 1A, Risk Factors in our 2021 Form 10-K.

### Assets in Development

Assets in development, which represents the potential design/build project value of small-scale renewable energy plants that have been awarded or for which we have secured development rights, were estimated at $1.5 billion, which includes $79.8 million attributable to a non-controlling interest at September 30, 2022, and $1.2 billion at September 30, 2021. The portion related to spending for Energy as a Service assets was approximately $36.4 million and $69.9 million at September 30, 2022 and 2021, respectively. This is another important metric because it helps us gauge our future capacity to generate electricity or deliver renewable gas fuel which contributes to our recurring revenue stream.

### Results of Operations

All financial result comparisons made below are against the same prior year period unless otherwise noted.

The following tables set forth certain financial data from the condensed consolidated statements of income for the periods indicated:

*(In Thousands)*

|  | Three Months Ended September 30, 2022 Amount | % of Revenues | 2021 Amount | % of Revenues | Year-Over-Year Change Dollar Change | % Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Revenues | $441,296 | 100.0% | $273,682 | 100.0% | $167,614 | 61.2% |
| Cost of revenues | 361,740 | 82.0% | 214,869 | 78.5% | 146,871 | 68.4% |
| Gross profit | 79,556 | 18.0% | 58,813 | 21.5% | 20,743 | 35.3% |
| Selling, general and administrative expenses | 40,618 | 9.2% | 35,168 | 12.8% | 5,450 | 15.5% |
| Operating income | 38,938 | 8.8% | 23,645 | 8.6% | 15,293 | 64.7% |
| Other expenses, net | 7,546 | 1.7% | 4,557 | 1.7% | 2,989 | 65.6% |
| Income before income taxes | 31,392 | 7.1% | 19,088 | 7.0% | 12,304 | 64.5% |
| Income tax provision (benefit) | 3,657 | 0.8% | (1,192) | (0.4)% | 4,849 | (406.8)% |
| Net income | 27,735 | 6.3% | 20,280 | 7.4% | $7,455 | 36.8% |
| Net income attributable to redeemable non-controlling interest | (344) | (0.1)% | (2,857) | (1.0)% | $2,513 | 88.0% |
| Net income attributable to common shareholders | $27,391 | 6.2% | $17,423 | 6.4% | $9,968 | 57.2% |

Our results of operations for the three months ended September 30, 2022 are due to the following:

- ***Revenues:*** total revenues for the three months ended September 30, 2022 increased over 2021 primarily due to a $157.5 million, or 81%, increase in our project revenues attributed to the timing of revenue recognized as a result of the phase of active projects versus the prior year, including our SCE battery storage project.
- ***Cost of Revenues and Gross Profit:*** the increase in cost of revenues is primarily due to the increase in project revenues described above. Gross profit increased due to increased revenue, however, our gross profit as a percent of revenues decreased due to the higher revenue contribution from our lower margin SCE battery storage project.
- ***Selling, General and Administrative Expenses (“SG&A”):*** SG&A expenses for the three months ended September 30, 2022 increased over 2021 primarily due to higher net salaries and benefits of $5.0 million as a result of increased headcount and non-cash stock compensation expense.
- ***Other Expenses, Net:*** Other expenses, net, includes gains and losses from derivatives transactions, foreign currency transactions, interest expense, interest income, amortization of financing costs and certain government incentives. Other expenses, net for the three months ended September 30, 2022 increased over 2021 primarily due to higher interest expenses of $3.2 million related to increased amounts outstanding on our senior secured debt facility and the timing of government incentive income received. This increase was partially offset by a gain on derivatives of $0.8 million compared to a loss of $0.7 million in the prior year.
- ***Income before Income Taxes:*** the increase in income before income taxes is due to reasons described above.
- ***Income Tax (Benefit) Provision:*** the provision for income taxes is based on various rates set by federal, state, provincial and local authorities and is affected by permanent and temporary differences between financial accounting and tax reporting requirements. The effective tax rate was higher in 2022 as compared to 2021 primarily due to higher domestic income resulting in higher state taxes, lower levels of compensation deductions related to employee stock option exercises, and less favorable tax adjustments related to partnership flip transactions.
- ***Net Income and Earnings Per Share:*** Net income attributable to common shareholders increased due to the reasons described above. Basic earnings per share for the three months ended September 30, 2022 was $0.53, an increase of $0.19 per share compared to the same period of 2021. Diluted earnings per share for 2022 was $0.51, an increase of $0.18 per share compared to last year. The results for the three months ended September 30, 2022 and 2021 reflect a non-cash downward adjustment of $0.3 million and $2.9 million, respectively, related to non-controlling interest activities.

*(In Thousands)*

|  | Nine Months Ended September 30, 2022 Amount | % of Revenues | 2021 Amount | % of Revenues | Year-Over-Year Change Dollar Change | % Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Revenues | $1,492,695 | 100.0% | $799,804 | 100.0% | $692,891 | 86.6% |
| Cost of revenues | 1,263,458 | 84.6% | 640,760 | 80.1% | 622,698 | 97.2% |
| Gross profit | 229,237 | 15.4% | 159,044 | 19.9% | 70,193 | 44.1% |
| Selling, general and administrative expenses | 118,559 | 7.9% | 95,651 | 12.0% | 22,908 | 23.9% |
| Operating income | 110,678 | 7.4% | 63,393 | 7.9% | 47,285 | 74.6% |
| Other expenses, net | 19,876 | 1.3% | 13,679 | 1.7% | 6,197 | 45.3% |
| Income before income taxes | 90,802 | 6.1% | 49,714 | 6.2% | 41,088 | 82.6% |
| Income tax provision | 10,896 | 0.7% | (883) | (0.1)% | 11,779 | (1,334.0)% |
| Net income | 79,906 | 5.4% | 50,597 | 6.3% | $29,309 | 57.9% |
| Net income attributable to redeemable non-controlling interest | (2,915) | (0.2)% | (8,345) | (1.0)% | $5,430 | 65.1% |
| Net income attributable to common shareholders | $76,991 | 5.2% | $42,252 | 5.3% | $34,739 | 82.2% |

Our results of operations for the nine months ended September 30, 2022 are due to the following:

- ***Revenues:*** total revenues for the nine months ended September 30, 2022 increased over 2021 primarily due to a $663.1 million, or 116%, increase in our project revenues attributed to the timing of revenue recognized as a result of the phase of active projects versus the prior year, including our SCE battery storage project.
- ***Cost of Revenues and Gross Profit:*** the increase in cost of revenues is primarily due to the increase in project revenues described above. Gross profit increased due to increased revenue, however, our gross profit as a percent of revenues decreased due to the higher revenue contribution from our lower margin SCE battery storage project.
- ***Selling, General and Administrative Expenses (“SG&A”):*** SG&A expenses for the nine months ended September 30, 2022 increased over 2021 primarily due to higher net salaries and benefits of $16.7 million as a result of increased headcount and an increase in non-cash stock compensation expense. The increase is also attributed to higher miscellaneous expenses related to a settlement of an outstanding legal proceeding, higher software-as-a-service fees, and insurance costs.
- ***Other Expenses, Net:*** Other expenses, net, includes gains and losses from derivatives transactions, foreign currency transactions, interest expense, interest income, amortization of financing costs and certain government incentives. Other expenses, net for the nine months ended September 30, 2022 increased over 2021 primarily due to higher interest expenses of $8.2 million related to an increase in amounts outstanding on our senior secured debt facility. This was partially offset by a gain on derivatives of $0.2 million compared to a loss of $1.9 million in the prior year.
- ***Income before Income Taxes:*** the increase in income before income taxes is due to reasons described above.
- ***Income Tax (Benefit) Provision:*** the provision for income taxes is based on various rates set by federal, state, provincial and local authorities and is affected by permanent and temporary differences between financial accounting and tax reporting requirements. The effective tax rate was higher in 2022 as compared to 2021 primarily due to primarily due to higher domestic income resulting in higher state taxes, lower levels of compensation deductions related to employee stock option exercises, and less favorable tax adjustments related to partnership flip transactions.
- ***Net Income and Earnings Per Share:*** Net income attributable to common shareholders increased due to the reasons described above. Basic earnings per share for the nine months ended September 30, 2022 was $1.48, an increase of $0.65 per share compared to the same period of 2021. Diluted earnings per share for 2022 was $1.44, an increase of $0.63 per share compared to last year. The results for the nine months ended September 30, 2022 and 2021 reflect a non-cash downward adjustment of $2.9 million and $8.3 million, respectively, related to non-controlling interest activities.

### Business Segment Analysis

Our reportable segments for the three and nine months ended September 30, 2022 were U.S. Regions, U.S. Federal, Canada, Alternative Fuels (formerly Non-Solar Distributed Generation (“Non-Solar DG”)) and All Other. On January 1, 2022, we changed the structure of our internal organization and our “All Other” segment now includes our U.S.-based enterprise energy management services previously included in our U.S Regions segment and our U.S. Regions segment now includes U.S. project revenue and associated costs previously included in our former Non-Solar DG segment. As a result, previously reported amounts have been reclassified for comparative purposes. These segments do not include results of other activities, such as corporate operating expenses not specifically allocated to the segments. See Note 16 “Business Segment Information” for additional information about our segments.

All financial result comparisons made below relate to both the three and nine month periods and are against the same prior year period unless otherwise noted.

### Revenues

*(In Thousands)*

|  | Three Months Ended September 30, 2022 | 2021 | Dollar Change | % Change | Nine Months Ended September 30, 2022 | 2021 | Dollar Change | % Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| U.S. Regions | $271,206 | $107,711 | $163,495 | 151.8% | $983,111 | $314,978 | $668,133 | 212.1% |
| U.S. Federal | 99,124 | 96,656 | 2,468 | 2.6 | 276,198 | 289,068 | (12,870) | (4.5) |
| Canada | 12,366 | 11,658 | 708 | 6.1 | 43,999 | 34,176 | 9,823 | 28.7 |
| Alternative Fuels | 29,421 | 28,238 | 1,183 | 4.2 | 87,874 | 80,031 | 7,843 | 9.8 |
| All Other | 29,179 | 29,419 | (240) | (0.8) | 101,513 | 81,551 | 19,962 | 24.5 |
| Total revenues | $441,296 | $273,682 | $167,614 | 61.2% | $1,492,695 | $799,804 | $692,891 | 86.6% |

- ***U.S. Regions:*** revenues increased primarily due to higher project revenues resulting from the timing of revenue recognized based upon costs incurred to date relative to total expected costs on active projects, including our SCE battery storage projects, versus the prior year.
- ***U.S. Federal:*** the increase in revenue this quarter versus the prior year quarter is primarily due to higher O&M revenue attributed to the timing of new projects entering the O&M phase. Project revenues year to date, decreased year-over-year resulting from the timing of revenue recognized based upon costs incurred to date relative to total expected costs on active projects which were impacted by supply chain delays.
- ***Canada:*** revenues were relatively flat versus the prior year quarter as project revenues were impacted by various supply chain delays and site access restrictions. Revenues year to date increased year-over-year due to higher project revenues resulting from the timing of revenue recognized based upon costs incurred to date relative to total expected costs on active projects versus the prior year.
- ***Alternative Fuels:*** the increase in revenue is primarily attributed to higher energy asset revenues resulting from the continued growth of our operating portfolio and increased renewable gas production levels.
- ***All Other:*** All other revenues increased year-over-year primarily due to higher project revenues resulting from the timing of revenue recognized based upon costs incurred to date relative to total expected costs on active projects and higher integrated-PV revenue attributed to increased shipments resulting from stronger demand in the oil and gas market.

### Income before Taxes and Unallocated Corporate Activity

*(In Thousands)*

|  | Three Months Ended September 30, 2022 | 2021 | Dollar Change | % Change | Nine Months Ended September 30, 2022 | 2021 | Dollar Change | % Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| U.S. Regions | $26,349 | $10,499 | $15,850 | 151.0% | $77,407 | $21,456 | $55,951 | 260.8% |
| U.S. Federal | 15,726 | 15,150 | 576 | 3.8 | 36,623 | 38,262 | (1,639) | (4.3) |
| Canada | 191 | 270 | (79) | (29.3) | 1,482 | 1,005 | 477 | 47.5 |
| Alternative Fuels | 4,993 | 3,595 | 1,398 | 38.9 | 18,891 | 17,083 | 1,808 | 10.6 |
| All Other | 3,104 | 1,121 | 1,983 | 176.9 | 8,952 | 4,574 | 4,378 | 95.7 |
| Unallocated corporate activity | (18,971) | (11,547) | $(7,424) | (64.3) | (52,553) | (32,666) | (19,887) | (60.9) |
| Income before taxes | $31,392 | $19,088 | $12,304 | 64.5% | $90,802 | $49,714 | $41,088 | 82.6% |

- ***U.S. Regions:*** the increase is primarily due to the higher revenues described above, partially offset by higher salaries and benefit costs, and other expenses which included an expense recognized to increase the fair value of contingent consideration related to one of our acquisitions.
- ***U.S. Federal:*** the increase for the three months ended September 30, 2022 is primarily due to lower operating expenses which included the impact of income recognized from an equity method investment. The decrease for the nine months ended September 30, 2022 is primarily due to the decrease in revenues described above partially offset by lower operating expenses which included the impact of income from an equity method investment.
- ***Canada:*** the decrease for the three months ended September 30, 2022 is primarily due to lower gains on derivative transactions and unfavorable foreign exchange rates and the increase for the nine months ended September 30, 2022 is primarily due to the higher revenues described above partially offset by unfavorable foreign exchange rates.
- ***Alternative Fuels:*** the increase for the three months ended September 30, 2022 is primarily due to mark to market gains on our unhedged commodity gas swaps versus mark to market losses in the prior year. The increase for the nine months ended September 30, 2022 is primarily due to the higher revenues described above and lower other expenses which included an impairment charge in the prior year, partially offset by higher interest expenses.
- ***All Other:*** the increase for the three months ended September 30, 2022 is primarily due to higher gross profits driven by higher oil and gas sales and projects nearing completion and the increase for the nine months ended September 30, 2022 is primarily due to the higher revenues described above.
- Unallocated corporate activity includes all corporate level selling, general and administrative expenses and other expenses not allocated to the segments. We do not allocate any indirect expenses to the segments. Corporate activity increased primarily due to higher net salaries and benefit costs, insurance costs, software-as-a-service fees, and interest expenses.

### Liquidity and Capital Resources

### Overview

Since inception, we have funded operations primarily through cash flow from operations, advances from Federal ESPC projects, our senior secured credit facility, and various forms of other debt. In addition, in March 2021, we completed an underwritten public offering of 2,875,000 shares of our Class A Common Stock, for total net proceeds of $120.1 million. See Note 7 “Debt and Financing Lease Liabilities” for additional information.

Working capital requirements, which can be susceptible to fluctuations during the year due to seasonal demands, generally result from revenue growth, our solar equipment purchase patterns, the timing of funding under various contracts, or advances from Federal ESPC projects, and payment terms for receivables and payables.

We expect to incur additional expenditures in connection with the following activities:

- equity investments, project asset acquisitions and business acquisitions that we may fund from time to time
- capital investment in current and future energy assets
- material, equipment, and other expenditures for our SCE battery storage project

We regularly monitor and assess our ability to meet funding requirements. We believe that cash and cash equivalents, working capital and availability under our revolving senior secured credit facility, combined with our right (subject to lender consent) to increase our revolving credit facility by $100.0 million, and our general access to credit and equity markets, will be sufficient to fund our operations through at least November 2023 and thereafter. We funded a significant portion of the contract expenditures for our SCE battery storage project during the nine months ended September 30, 2022. With the schedule adjustment requested by SCE and the anticipated timeline for completing the projects, we expect to continue to incur and fund capital expenditures for the SCE battery project into the first half of 2023, net of any cash collected on amounts invoiced.

We continue to evaluate and take action, as necessary, to preserve adequate liquidity and ensure that our business can continue to operate and that we can meet our capital requirements during these uncertain times. This may include limiting discretionary spending across the organization and re-prioritizing our capital projects amid times of political unrest, the evolution of the COVID-19 pandemic, the duration of supply challenges, and the rate and duration of the inflationary pressures. For example, recent increases in inflation and interest rates have impacted overall market returns on assets. We have therefore been particularly prudent in our capital commitments over the past few quarters, ensuring that our assets in development continue to align with our hurdle rates.

### Sources of Liquidity

#### Senior Secured Credit Facility

On March 4, 2022, we entered into the fifth amended and restated senior secured credit facility, which increased the aggregate amount of total commitments from $245.0 million to $495.0 million. This amendment increased the aggregate amount of the revolving commitments from $180.0 million to $200.0 million, increased the existing term loan A to $75.0 million, and extended the maturity date of the revolving commitment and term loan A from June 28, 2024 to March 4, 2025. In addition, it added a delayed draw term loan A for up to $220.0 million through a September 4, 2023 maturity date, increased the total funded debt to EBITDA covenant ratio from a maximum of 3.50 to 4.50 for the quarter ended March 31, 2022; 4.25 for the quarter ending June 30, 2022, 4.00 for the quarters ending September 30, 2022 and December 31, 2022; and 3.50 thereafter. The amendment also specified the debt service coverage ratio to be less than 1.5 and increased our limit under an energy conversation project financing to $650.0 million, which provides us with flexibility to grow our federal business further. As of September 30, 2022, the balance on the senior secured term loans was $295.0 million, the balance on the senior secured revolving credit facility was $184.0 million, and we had funds available of $0.3 million.

On June 9, 2022, we entered into the first amendment to the fifth amended and restated senior secured credit facility, which increased the maximum indebtedness incurred under an energy conservation project financing from $650.0 million to $725.0 million from and after April 1, 2022 to and including December 30, 2022.

#### Project Financing - Non-recourse Revolvers, Loans and Financing Facilities

We have entered into a number of construction and term loan agreements for the purpose of constructing and owning certain renewable energy plants. While we are required under generally accepted accounting principles (“GAAP”) to reflect these loans as liabilities on our consolidated balance sheets, they are generally non-recourse and not direct obligations of Ameresco, Inc.

During the nine months ended September 30, 2022, we received gross proceeds from these non-recourse financings of $36.1 million. At September 30, 2022, the balance outstanding on our non-recourse debt was $350.0 million and approximately $376.9 million remained available under these lending commitments, which expire at various dates from December 2022 through July 2024. See Notes 6. “Leases” and 7. “Debt and Financing Lease Liabilities” for additional details.

On October 26, 2022 we refinanced a non-recourse credit facility with a new loan which is scheduled to mature on October 26, 2037, provides a principal amount of up to $125,000 and bears interest at a rate of 6.50% with a residual percentage of distributable cash flows payable after the maturity date of the loan, until the earlier of the lender achieving an 8.25% “IRR” on funds borrowed under the facility, or the facility discharge date on October 26, 2047. The principal and interest payments are due in quarterly installments based on an five-year amortization schedule with the principal payments being adjusted based on the distributable cash flows from the three renewable natural gas projects owned and operated by the project companies. No up-front, commitment or structuring fees were payable on the credit facility. The obligations under the loan are guaranteed by all the related subsidiaries and are secured by the subsidiaries’ assets as well as our equity interest in the signing subsidiary. Borrowings under the credit facility are otherwise non-recourse to Ameresco.

At the closing, we drew down $80,000 under this facility, approximately $26,500 of which was used to repay all amounts outstanding under the prior loan and the remainder was used to terminate swap obligations, pay transaction costs, make permitted distributions to Ameresco and for the project companies' working capital needs. The facility allows two additional draws, subject to certain conditions, up to the remaining principal amount, to be used to make distributions to Ameresco. See Note 18. “Subsequent Events” for additional information.

### Cash Flows

The following table summarizes our cash flows from operating, investing, and financing activities:

*(In Thousands)*

|  | Nine Months Ended September 30, 2022 | 2021 | $ Change |
| --- | ---: | ---: | ---: |
| Cash flows from operating activities | $(273,169) | $(116,344) | $(156,825) |
| Cash flows from investing activities | (202,664) | (150,100) | (52,564) |
| Cash flows from financing activities | 554,194 | 261,267 | 292,927 |
| Effect of exchange rate changes on cash | (1,857) | 118 | (1,975) |
| Total net cash flows | $76,504 | $(5,059) | $81,563 |

Our service offering also includes the development, construction, and operation of small-scale renewable energy plants. Small-scale renewable energy projects, or energy assets, can either be developed for the portfolio of assets that we own and operate or designed and built for customers. Expenditures related to projects that we own are recorded as cash outflows from investing activities. Expenditures related to projects that we build for customers are recorded as cash outflows from operating activities as cost of revenues.

#### Cash Flows from Operating Activities

Our cash flows from operating activities decreased from the same period last year primarily due to an increase of $302.9 million in unbilled revenue (costs and estimated earnings in excess of billings) due to the timing of when certain projects are invoiced, including our SCE battery storage project and a $75.0 million increase in accounts receivable, which were partially offset by increases of $160.7 million in accounts payable, accrued expenses and other current liabilities, and $29.3 million in net income when compared to the prior year period.

#### Cash Flows from Investing Activities

During the nine months ended September 30, 2022 we made capital investments of $182.1 million in new energy assets and $16.1 million in major maintenance of energy assets, compared to $141.3 million and $6.7 million, respectively, in 2021.

We currently plan to invest approximately $40 million to $90 million in additional capital expenditures during the remainder of 2022, principally for the construction or acquisition of new renewable energy plants, the majority of which we expect to fund with project finance debt.

#### Cash Flows from Financing Activities

Our primary sources of financing for the nine months ended September 30, 2022 were net proceeds from long-term debt of $328.2 million, net proceeds received from Federal ESPC projects and energy assets of $181.5 million, and net proceeds from our senior secured revolver of $139.0 million, partially offset by payments on long-term debt of $111.3 million.

Our primary sources of financing for the nine months ended September 30, 2021 were net proceeds from our equity offering of $120.1 million, net proceeds received from Federal ESPC projects and energy assets of $114.0 million, net proceeds from long-term debt financings of $118.2 million, partially offset by net payments from our senior secured credit facility of $38.1 million, and payments on long-term debt of $55.6 million.

We currently plan additional project financings of approximately $100 million to $140 million during the remainder of 2022 to fund the construction or the acquisition of new renewable energy plants as discussed above.

### Critical Accounting Estimates

Preparing our condensed consolidated financial statements in accordance with GAAP involves us making estimates and assumptions that affect reported amounts of assets and liabilities, net sales and expenses, and related disclosures in the accompanying notes at the date of our financial statements. We base our estimates on historical experience, industry and market trends, and on various other assumptions that we believe to be reasonable under the circumstances. However, by their nature, estimates are subject to various assumptions and uncertainties, and changes in circumstances could cause actual results to differ from these estimates, sometimes materially.

### Income Taxes

We have reviewed all tax positions taken as of September 30, 2022 and there were no additional uncertain tax positions taken during the three months ended September 30, 2022. We believe our current tax reserves are adequate to cover all known tax uncertainties.

Other than as noted above, there have been no material changes in our critical accounting estimates from those disclosed in Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations of our 2021 Form 10-K. In addition, refer to Note 2 “Summary of Significant Accounting Policies” for updates to critical accounting policies.

### Recent Accounting Pronouncements

See Note 2, “Summary of Significant Accounting Policies” for a discussion of recent accounting pronouncements.

## Market risk

As filed, 206 characters.

As of September 30, 2022, there have been no significant changes in market risk exposures that materially affected the quantitative and qualitative disclosures as described in Item 7A to our 2021 Form 10-K.

## Controls and procedures

As filed, 2,448 characters.

### Evaluation of Disclosure Controls and Procedures

Our management, with the participation of our principal executive officer and principal financial officer, evaluated the effectiveness of our disclosure controls and procedures, as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act, as of the end of the period covered by this quarterly report, or the evaluation date. Disclosure controls and procedures are designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Exchange Act is accumulated and communicated to the company’s management, including its principal executive and principal financial officers, as appropriate to allow timely decisions regarding required disclosures. Our management recognizes that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving their objectives, and management necessarily applies its judgment in evaluating the cost-benefit relationship of possible controls and procedures. Our management, after evaluating the effectiveness of our disclosure controls and procedures as of the evaluation date, concluded that as of the evaluation date, our disclosure controls and procedures were effective at a reasonable assurance level.

### Changes in Internal Control over Financial Reporting

During the nine months ended September 30, 2022, we implemented a new Enterprise Resource Planning (“ERP”) system. In connection with this ERP implementation, we are updating and will continue to update our internal control over financial reporting, as necessary, to accommodate modifications to our business processes and accounting procedures. We do not believe this implementation has had or will have a material adverse effect on our internal control over financial reporting.

Except as disclosed above, there were no changes in our internal control over financial reporting during our most recent fiscal quarter that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 767 characters.

Our business is subject to numerous risks, a number of which are described below and under “Risk Factors” in Part I, Item 1A of our 2021 Form 10-K and Part II, Item 1A. “Risk Factors” of our Q1 2022 Form 10-Q.

You should carefully consider these risks together with the other information set forth in this report, which could materially affect our business, financial condition and future results. The risks described in Part I, Item 1A of our 2021 Form 10-K as supplemented and updated in Part II, Item 1A. “Risk Factors” of our Q1 2022 Form 10-Q are not the only risks we face. Risks and uncertainties not currently known to us or that we currently deem to be immaterial also may materially adversely affect our business, financial condition and operating results.

Filed Nov 1, 2022.
Source: SEC EDGAR, the filing index for accession 0001488139-22-000107. Last ingested by Listed: Nov 10, 2026, 04:22 ET. No prices; not investment advice.