# Argan Inc: Form 10-Q for the period ended Apr 30, 2023

- Company: [Argan Inc](/companies/agx.md) (CIK 100591)
- Form: 10-Q
- Filed: 2023-06-08
- Accepted by EDGAR: Jun 8, 2023, 16:25 ET
- Period: 2023-04-30
- Accession: 0001558370-23-010910
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/100591/000155837023010910/agx-20230430x10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/100591/000155837023010910/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2023-04-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2023-02-01 to 2023-04-30 | $103.7m | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 3 months, 2023-02-01 to 2023-04-30 | $89.5m | us-gaap:CostOfRevenue |
| Gross profit | 3 months, 2023-02-01 to 2023-04-30 | $14.2m | us-gaap:GrossProfit |
| Selling, general and administrative | 3 months, 2023-02-01 to 2023-04-30 | $10.6m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months, 2023-02-01 to 2023-04-30 | $3.6m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2023-02-01 to 2023-04-30 | $895.0k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2023-02-01 to 2023-04-30 | $2.1m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2023-02-01 to 2023-04-30 | $0.16 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2023-02-01 to 2023-04-30 | $0.16 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2023-02-01 to 2023-04-30 | 13,546,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2023-02-01 to 2023-04-30 | −$1.2m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2023-02-01 to 2023-04-30 | $645.0k | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2023-02-01 to 2023-04-30 | $3.4m | us-gaap:PaymentsOfDividendsCommonStock |
| Share repurchases | 3 months, 2023-02-01 to 2023-04-30 | $3.7m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2023-04-30 | $195.9m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2023-04-30 | $425.0m | us-gaap:AssetsCurrent |
| Total assets | at 2023-04-30 | $475.7m | us-gaap:Assets |
| Current liabilities | at 2023-04-30 | $192.4m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2023-04-30 | $197.7m | us-gaap:Liabilities |
| Shareholders' equity | at 2023-04-30 | $277.9m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 68,802 characters.

The following discussion summarizes the financial position of Argan, Inc. and its subsidiaries as of April 30, 2023, and the results of their operations for the three month periods ended April 30, 2023 and 2022, and should be read in conjunction with (i) the unaudited condensed consolidated financial statements and notes thereto included elsewhere in this Quarterly Report on Form 10-Q and (ii) the consolidated financial statements and accompanying notes included in our Annual Report on Form 10-K for Fiscal 2023 that was filed with the SEC on April 17, 2023 (the “Annual Report”).

### Cautionary Statement Regarding Forward Looking Statements

The Private Securities Litigation Reform Act of 1995 provides a “safe harbor” for certain forward-looking statements. We have made statements in this Item 2 and elsewhere in this Quarterly Report on Form 10-Q that may constitute “forward-looking statements.” The words “believe,” “expect,” “anticipate,” “plan,” “intend,” “estimate,” “foresee,” “should,” “would,” “could,” or other similar expressions are intended to identify forward-looking statements.

Our forward-looking statements, financial position and results of operations, are based on our current expectations and beliefs concerning future developments and their potential effects on us. There can be no assurance that future developments affecting us will be those that we anticipate. All comments concerning our expectations for future revenues and operating results are based on our forecasts for existing operations and do not include the potential impact of any future acquisitions.

Our forward-looking statements, by their nature, involve significant risks and uncertainties (some of which are beyond our control) and assumptions. They are subject to change based upon various factors including, but not limited to, the risks and uncertainties described in this Quarterly Report on Form 10-Q and our Annual Report. Should one or more of these risks or uncertainties materialize, or should any of our assumptions prove to be incorrect, actual results may vary in material respects from those projected in the forward-looking statements. We undertake no obligation to publicly update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

### Business Description

The Company is primarily a construction firm that conducts operations through its wholly-owned subsidiaries, GPS, APC, TRC and SMC. Through GPS and APC, we provide a full range of engineering, procurement, construction, commissioning, maintenance, project development and technical consulting services to the power generation market, including the renewable energy sector, for a wide range of customers, including independent power project owners, public utilities, power plant heavy equipment suppliers and other commercial firms with significant power requirements. GPS and APC represent our power industry services reportable segment. Through TRC, the industrial fabrication and field services reportable segment provides primarily on-site services that support new plant construction and additions, maintenance turnarounds, shutdowns and emergency mobilizations for industrial plants primarily located in the Southeast region of the U.S. and that may include the fabrication, delivery and installation of steel components such as piping systems and pressure vessels. Through SMC, which conducts business as SMC Infrastructure Solutions, the telecommunications infrastructure services segment provides project management, construction, installation and maintenance services to commercial, local government and federal government customers primarily in the Mid-Atlantic region of the U.S.

We may make additional opportunistic acquisitions and/or investments by identifying companies with significant potential for profitable growth and realizable synergies with one or more of our existing businesses. However, we may have more than one industrial focus depending on the opportunity and/or needs of our customers. Significant acquired companies will be operated in a manner that we believe will best provide long-term and enduring value for our stockholders.

### Overview

### Operating Results

Consolidated revenues for the three months ended April 30, 2023 were $103.7 million, which represented an increase of $3.4 million, or 3.4%, from consolidated revenues of $100.3 million reported for the three months ended April 30, 2022.

The revenues of the power industry services segment decreased by $3.8 million to $70.2 million for the three months ended April 30, 2023, from $73.9 million reported for the three months ended April 30, 2022. The revenues of this reportable segment of our business represented 67.7% and 73.7% of corresponding consolidated revenues for the three months ended April 30, 2023 and 2022, respectively. The industrial services business reported revenues of $30.3 million for the three months ended April 30, 2023. This amount represented an increase of $7.8 million, or 34.7%, from revenues of $22.5 million reported by TRC for the three months ended April 30, 2022. Revenues provided by this reportable business segment represented 29.2% and 22.4% of corresponding consolidated revenues for the three months ended April 30, 2023 and 2022, respectively.

Consolidated gross profit for the three-month period ended April 30, 2023 was $14.2 million, or approximately 13.7% of the corresponding consolidated revenues, which reflected positive contributions from all three reportable business segments. For the three-month period ended April 30, 2022, the consolidated gross profit was $19.7 million, which represented approximately 19.7% of the corresponding amount of consolidated revenues.

Selling, general and administrative expenses for the three months ended April 30, 2023 and 2022 was $10.6 million for each period.

Other loss, net, for the three months ended April 30, 2023 was $0.6 million, which reflected the wire-transfer fraud loss that occurred on March 7, 2023 and related professional fees (see Note 15 to the accompanying condensed consolidated financial statements), offset partially by income earned during the period on funds invested in a money market fund, CDs and U.S. Treasury notes.

For the three months ended April 30, 2023, income tax expense was $0.9 million which represented an estimated annual effective income tax rate of 25.3%. For the three months ended April 30, 2022, income tax expense was $2.3 million which represented an estimated annual effective income tax rate of 23.7% for the period.

For the three months ended April 30, 2023, our overall operating profit performance resulted in net income in the amount of $2.1 million, or $0.16 per diluted share. For the comparable period last year, we reported net income in the amount of $7.5 million, or $0.50 per dilutive share.

### Project Backlog

At April 30, 2023, our consolidated project backlog amount of $0.8 billion consisted substantially of the projects of the power industry services reporting segment. The comparable backlog amount as of January 31, 2023 was also $0.8 billion. Our reported amount of project backlog at a point in time represents the total value of projects awarded to us that we consider to be firm as of that date less the amounts of revenues recognized to date on the corresponding projects.

Typically, we include the total value of EPC services and other major construction contracts in project backlog when we receive a corresponding notice to proceed from the project owner. However, we may include the value of an EPC services contract prior to the receipt of a notice to proceed if we believe that it is probable that the project will commence within a reasonable timeframe, among other factors. Projects that are awarded to us may remain included in our backlog for extended periods of time as customers experience project delays. However, cancellations or reductions may occur that would reduce project backlog and that could adversely affect our expected future revenues.

We are committed to the construction of state-of-the-art, natural gas-fired power plants, which represents our core business, as important elements of our country’s electricity-generation mix in the future. In addition, we have been directing certain business development efforts to winning projects for the erection of utility-scale wind farms and solar fields and for the construction of hydrogen-based energy and other industrial projects in order to diversify the sources of revenues. We have successfully completed renewable energy projects in the past and we have renewed efforts to obtain new work in other sectors of the power market that will complement our natural gas-fired EPC services projects going forward.

During the first quarter ended April 30, 2023, we achieved the substantial completion milestone for the Guernsey Power Station, which is located in Cambridge, Ohio, pursuant to an EPC services contract with Caithness Energy, L.L.C. This 1,875 MW, combined cycle power plant remains the largest single-phase, gas-fired, electricity-generation plant in the U.S. A small portion of our consolidated project backlog at April 30, 2023 relates to this project as GPS completes the commissioning process for this project, including all punch-list items, other commissioning tasks and demobilization efforts, as well as the closeout of open contract variations. Final completion of this project is currently expected to occur during the third quarter of Fiscal 2024.

We are also nearing completion of efforts under an EPC services contract with CPV Maple Hill Solar, LLC, an affiliate of Competitive Power Ventures, Inc., to construct the Maple Hill Solar facility, which we believe will be among the largest solar-powered energy plants in Pennsylvania. Project completion is currently scheduled to occur during the second half of Fiscal 2024. The unique Maple Hill Solar project, which is located in Cambria County, is being constructed using over 235,000 photovoltaic modules to generate approximately 100 MW of electrical power.

In October 2022, GPS added the EPC services contract value of the Trumbull Energy Center, a 950 MW natural gas-fired power plant to be built in Lordstown, Ohio. We received the full notice to proceed with the project from the owner, Clean Energy Future-Trumbull, LLC, in November 2022. We have since commenced activities for the project. This combined cycle power station will consist of two Siemens Energy SGT6-8000H gas fired, high efficiency, combustion turbines with two heat recovery steam generators and a single steam turbine. Project completion is scheduled for late in the year ending January 31, 2026.

Together, the Trumbull Energy Center, the Guernsey Power Station, the Maple Hill Solar facility represent nearly 3.0 gigawatts of potential electrical power. Additionally, the technical, project support and project management teams of GPS continue to team with APC on a new project in Ireland and assist APC with certain other current projects and business development efforts.

The business development efforts conducted by our APC operations have resulted in a significant increase in the project backlog of this business, which amounted to approximately $145 million as of April 30, 2023. A significant award occurred in October 2021 as APC entered into an engineering and construction services contract with EPUKI London, U.K., to construct a 2 x 330 MW natural gas-fired power plant in Carrickfergus that is near Belfast, Northern Ireland, in a structure that was initially designed to enclose coal-fired units. Our project, referred to as the “Kilroot” project, is being developed by EPNI Energy Limited. Full project activities are underway; however, there have been a number of unanticipated challenges related to this job impacting the contract, costs and schedule. Even with these difficulties, the overall completion of this project is expected to occur in the latter half of Fiscal 2024.

In May 2022, APC entered into engineering and construction services contracts with Ireland’s Electricity Supply Board (“ESB”) to construct three 65 MW aero-derivative gas turbine flexible generation power plants in and around the city of Dublin, Ireland. Two of the power plants, the Poolbeg and Ringsend FlexGen Power Plants, will be located on the Poolbeg Peninsula, and the Corduff FlexGen Power Plant will be built in nearby Goddamendy. All three projects cleared the applicable capacity auction in Fiscal 2023 and are expected to operate intermittently during peak periods of electricity demand and as back-up supply options when renewable electricity generation is limited. A full notice to proceed has been received and project activities have commenced. The completion of each power facility is expected to occur near the end of Fiscal 2024.

Additionally, APC was provided with limited notices to proceed with EPC project activities for an open-cycle gas turbine power facility in central Ireland that will have the capacity to generate approximately 264 MW of temporary emergency electrical power. GPS is teaming with APC in performance of this contract.

The project backlog of TRC has been increased by over 180% since April 30, 2022 to approximately $151 million as of April 30, 2023, reflecting a business development emphasis on the award of larger industrial field service construction projects from continuing and new customers. The recent emphasis on construction opportunities influenced the strategic decision to consolidate the pipe and vessel fabrication facilities to reduce fixed costs, streamline operations and better support a growing and scalable business model.

It is important to note that the start of new projects is primarily controlled by project owners and that delays may occur that are beyond our control. However, we continue to pursue natural gas-fired power plant, renewable energy plant and industrial construction opportunities in the U.S., Ireland and the U.K. Our vision is to safely contribute to the construction of the energy infrastructure and state-of-the-art industrial facilities that are essential to future economic prosperity in the areas where we operate. We intend to realize this vision with motivated, creative, high-energy and customer-driven teams that are committed to delivering the best possible project results each and every time.

### Market Outlook

The overall growth of our power business has been substantially based on the number of combined cycle gas-fired power plants built by us, as many coal-fired plants have been shut down. In 2010, coal-fired power plants accounted for about 45% of net electricity generation in the U.S. For 2022, coal fueled approximately 20% of net electricity generation. It has been reported that the average age of the active plants in the coal-fired fleet approximates 45 years old with an average life span of 50 years; the last coal-fired power plant built in the U.S. was constructed in 2015. On the other hand, natural-gas fired power plants provided approximately 39% of the electricity generated by utility-scale power plants in the U.S. in 2022, representing an increase of 69% from the amount of electrical power generated by natural gas-fired power plants in 2010, which provided approximately 24% of net electricity generation for 2010. The average age of utility-scale natural gas-fired power plants in the U.S. is approximately 22 years old with an average life span of 30 years.

Major advances in the safe combination of horizontal drilling techniques and hydraulic fracturing led to the boom in natural gas supplies which have been available generally at consistently low and stable prices. However, reductions in production levels during the pandemic and an increase in the amount of liquid natural gas exports, among other factors including the Russian invasion of Ukraine, strained domestic natural gas supplies and forced prices upwards. As a result, the price of natural gas in the U.S. increased meaningfully during the 2022 calendar year. However, spot prices have declined during the early months of 2023 and are forecasted to continue to lessen through the remainder of 2023 before rising again in calendar year 2024. When sudden power needs emerge and natural gas prices are relatively high, power producers often choose to increase coal-fired power to satisfy the short term demands for electricity.

In the reference case of its Annual Energy Outlook 2023, the Energy Information Administration (“EIA”) projects that economic growth paired with increasing electrification in end-user sectors will result in the stable growth of electricity demand in the U.S. through 2050. Declining capital costs for solar panels, wind turbines and battery storage, as well as government subsidies like those included in the IRA will result in renewables becoming increasingly cost effective compared with the alternatives when the costs of building new power capacity are considered. Renewables are increasingly meeting power demand through 2050 as they outcompete natural gas, coal and nuclear power. Uncertainty in natural gas prices leads to different unfavorable projections for combined cycle units in the short term, but in the long term, natural gas demand from the electric power sector stabilizes. As a result of the renewables growth, U.S. coal-fired generation capacity will decline sharply to about 54% of current levels by 2030, with a gradual decline thereafter.

The historic decline in the use of coal as a power source in the U.S. was caused, to a significant extent, by the plentiful supply of domestic and generally inexpensive natural gas which made it the fuel of choice for power plant developers over this period. The pace of the historic increase in the preference for natural gas as an electricity generating fuel source also was energized, in part, by environmental activism and restrictive regulations targeting coal-fired power plants. However, the environmentalist opposition against coal-fired power generation has expanded meaningfully to target all fossil fuel energy projects, including both power plants and pipelines, and has evolved into powerful support for renewable energy sources.

Protests against fossil-fuel related energy projects garner media attention and stir public skepticism about new projects which have resulted in delays due to onsite protest demonstrations, indecision by local officials and lawsuits. Various cities, counties and states have adopted clean energy and carbon-free goals or objectives with achievement expected by a certain future date, typically 10 to 30 years out. These aspirational goals may increase the risk of a new power plant becoming a stranded asset long before the end of its otherwise useful economic life, which is a risk that potential equity capital providers may be unwilling to take. The difficulty in obtaining project equity financing and the other factors identified above, may be adversely impacting the planning and initial phases for the construction of new natural gas-fired power plants. Lenders, who have become more wary of funding fossil-fuel ventures as environmental, social and governance ideals influence investment decisions, may be generally unwilling to provide capital for energy projects to increase the domestic production and transmission of oil and natural gas. In addition, an announcement by Chubb Insurance may signal new difficulties for certain oil and gas projects. In particular, the insurance underwriter will require oil and gas industry clients to implement plans to reduce methane emissions, that are among the most severe greenhouse gases, and will not provide insurance coverage for oil and gas projects in government-protected conservation areas that do not allow for sustainable use.

We believe that significant uncertainty relates to the policies of the current U.S. Presidential administration. President Biden proposes to make the electricity production in the U.S. carbon free by 2035 and to put the country on the path to achieve net zero carbon emissions by 2050. These policy stances continued during the invasion of Ukraine and the concurrent rise in oil prices as the administration made appeals to other countries to increase oil production while domestic production is challenged by supply chain and labor issues and the maintenance of restrictive regulations. Meanwhile, delays continue for the construction of pipelines needed to transport natural gas to liquid natural gas export facilities for shipment to Western Europe.

In August 2022, President Biden signed the IRA, a climate and healthcare bill that imposes new taxes on corporations with net profits for financial reporting in excess of $1.0 billion, spends billions of dollars over a decade on new workers and technology at the IRS, and funds hundreds of billions of dollars in tax subsidies intended to combat climate change among other measures. According to certain commentary, the legislation will cause investment in technologies needed for leaner production and the use of fuel types, including hydrogen, nuclear, renewables and fossil fuels. However, it appears that receipt of the majority of the tax subsidies will be conditioned on the extent that taxpayers “buy American” and/or pay prevailing wages, among other requirements. Existing supply chains may lack the capacity to meet the demand that the incentives are intended to create. Therefore, the subsidies may not provide the intended economic incentives to renewable and other energy project owners. It is not clear that the legislation, for which the rules and regulations have not yet been finalized, will provide assistance to current and future project owners of fossil-fuel power projects as intended.

In fact, in May 2023, the Biden administration proposed new rules for the Environmental Protection Agency (the “EPA”) that are intended to drastically reduce greenhouse gases from coal- and gas-fired power plants that officials admit will cost such plants billions of dollars to comply fully by 2042. The new EPA rules would give owners of energy plants, that are providing base load power, flexibility in choosing the means to achieve the emission targets. Alternatives could include the installation of carbon-capture systems that remove carbon dioxide from flue gases that are the byproduct of fossil-fuel combustion or the blending of cleaner fuels such as hydrogen. The rules are undergoing a two-month public comment period.

Most recently, the debt ceiling bill signed by President Biden on June 3, 2023, includes reforms for certain elements of the permitting process for energy projects. The bill imposes certain timelines for federal agencies to review and approve major energy projects and includes provisions designating a single agency to take the lead on the environmental review process. Such streamlining of the current permitting process for energy generating facilities could ease certain constraints on the power industry.

Regarding emissions, it is important to note that in its 2023 reference case, EIA projects that U.S. energy-related carbon dioxide emissions will decline by a little over 30% below the 2005 emissions level by 2030. We believe that a significant portion of the reduction related to the shift from coal-fired to natural gas-fired power generation has already occurred as described above. It appears that from 2005 to 2022, the energy-related emissions declined by approximately 20%. The EIA credits the impacts of the IRA, updates to technology costs and performance across the energy system and changes in the macroeconomic outlook with maintaining the reduction percentage versus the 2005 level of emissions at approximately 30% through 2050. In addition, the EIA indicates that further emissions reductions are limited by longer-term growth in U.S. transportation and industrial activity. The EIA in its report does not include emissions from the power industry among the reasons for the lack of further emission reductions from 2030 through 2050.

The net amount of electricity generation in the U.S. provided by utility-scale wind and solar photovoltaic facilities continues to rise. Together, such power facilities provided approximately 12%, 13% and 15% of the net amount of electricity generated by utility-scale power facilities in 2020, 2021 and 2022, respectively. EIA projects that new wind and photovoltaic solar capacity will continue to be added to the utility-scale power fleet in the U.S. at a brisk pace substantially attributable to declines in the amount of renewable power plant component and power storage costs, an increase in the scale of energy storage capacity (i.e., battery farms and other energy storage technologies), the availability of valuable tax credits and the overall political commitment to renewable energy.

Most of our recently completed and awarded EPC service contracts relate to the construction of natural gas-fired power plants located within the Mid-Atlantic geographic footprint of PJM Interconnection (“PJM”), which operates a capacity market to ensure long-term grid reliability by securing the appropriate amount of power supply resources needed to meet predicted future energy demands in the Mid-Atlantic region of the U.S. Capacity payments represent meaningful portions of the revenue streams of qualifying power plants. The capacity auction for a particular delivery year was usually held during the month of May, three years prior to the actual delivery year. However, the 2023/2024 auction, rescheduled to December 2021, was delayed until January 2022 and then was postponed again until June 2022. The auction results included increased capacity powered by nuclear, solar and natural gas energy sources, and decreased capacity provided by coal and wind energy sources. However, prices for the 2023/2024 and 2024/2025 delivery years were significantly lower than each previous auction. Capacity auction prices are scheduled to be posted for 2025-2026 in June 2023. However, PJM recently informed stakeholders that it will seek to delay this auction, which would require the approval of the Federal Energy Regulatory Commission (“FERC”), so that market design rule changes proposed by stakeholders might be implemented for all future auctions.

Uncertainty in this market, including the difficulties experienced by PJM in perfecting a capacity auction design that all of its stakeholders consider to be fair, the repeated capacity auction delays, and the shrinking annual capacity auction prices, may discourage potential power plant owners from commencing the development of new power plants in this area thereby reducing potential new business opportunities for us.

In February 2023, PJM released a position paper that supported the growing concern that the reliability of power grids is being eroded by the rush to renewable power. While acknowledging the reality of the power transition in the PJM system, it warned that its research highlighted four trends that present increasing reliability risks during the transition due to a potential timing mismatch between load growth, resource retirements and the pace of new electricity generating plant additions.

The paper indicates that the growth rate of electricity demand in the PJM footprint is likely to increase from electrification (i.e., shifts to electric-powered automobiles, electric appliances, etc.) coupled with the proliferation of high-demand data centers in the region. Coal-fired and old gas-fired power generation facilities are retiring at a rapid pace due to government and private sector policies as well as economics. The risk is that these retirements may outpace the construction of new power-generating facilities as PJM’s interconnection queue includes primarily intermittent and limited-duration renewable energy resources. Given the operating characteristics of these types of facilities, PJM will need multiple megawatts of renewable power and accompanying battery storage to replace a single megawatt of thermal generation.

In May 2023, the North American Reliability Corporation (“NERC”) issued its Summary Energy Market and Electric Reliability Assessment that does inform FERC that all regions have sufficient capacity power to meet summer demands under normal weather conditions, which is an improved situation as compared to last year. However, the report warns that most of the western U.S., as well as a few other areas of North America, could face capacity power shortfalls during the upcoming summer during extreme conditions like severe heatwaves. The reaction from at least one FERC Commissioner was a statement that the report bodes poorly for the ability of the grid to meet future energy needs, as intermittent renewable power sources continue to replace fossil-fuel plant retirements. The statement continued with an assertion that the U.S. is losing dispatchable electricity generation at a pace that is unsustainable and that will result in negative consequences in the future.

In summary, throughout the U.S., the risk of electricity shortages is real as traditional power plants are being retired more quickly than they can be replaced by renewable energy and battery storage. Power grids are feeling the strain as the U.S. makes the historic transition from conventional power plants fueled by coal and natural gas to cleaner forms of energy such as wind and solar power, and aging nuclear plants are slated for retirement. Electric-grid operators are warning that power-generating capacity is struggling to keep up with demand, a gap that could lead to additional rolling blackouts during heat waves or other peak power periods.

In the U.S., local electricity grids are connected to form larger networks and to improve reliability and economic efficiency and are known as Regional Transmission Operators (“RTOs”) and Independent System Operators (“ISOs”). They are members of three main interconnections, the Eastern Interconnection, the Western Interconnection and the Electric Reliability Council of Texas. These interconnectors cover wide swaths of the U.S. Although the three interconnections operate independently of each other and have very limited transfers of power between them, the operation of interconnections is conducted by balancing authorities, which ensures that power supply and demand are balanced to maintain the reliability of applicable power system. All RTOs, including PJM, and ISOs in the U.S. are balancing authorities. Consequently, reliability threats to individual RTOs and ISOs represent threats to entire interconnection organizations.

The challenge is that wind and solar farms do not produce electricity at all times and they need large batteries to store their output for later use. While large battery storage capacity is under development, regional grid operators have warned that the pace may not be fast enough to offset the closures of traditional power plants that can work around the clock.

Accelerating the build-out of renewable energy sources and batteries has become an especially difficult proposition amid supply-chain challenges and inflation. For example, during Fiscal 2023, the highly publicized probe by the U.S. Commerce Department into whether Chinese solar manufacturers were circumventing trade tariffs on solar panels had the effect of halting imports of key components needed to build new solar farms and effectively brought most of the U.S. solar industry to a temporary standstill.

Additionally, solar and wind energy plant developers continue to confront the problems caused by grid congestion, often unsuccessfully. Many of these projects have been canceled because renewable plants need to be sited where the resources are optimal, often in remote locations where the transmission systems are not robust as power is consumed substantially in urban areas. The costs associated with the necessary grid upgrades may be prohibitive.

U.S. offshore wind projects progress inconsistently, facing challenges in the areas of environmental and fishery impacts, grid connection complexities, transmission planning and federal permitting processes. Further, U.S. projects are confronted by shipping regulations that may limit the ability of developers to replicate successful European erection models. Proponents of clean energy also face political challenges from constituencies who oppose the impacts to wildlife and the environment that may be caused by clean energy infrastructure projects.

Electricity generation from commercial nuclear power plants in the U.S. began in 1958. At the end of 2021, the U.S. had 93 operating commercial nuclear reactors at 55 nuclear power plants in 28 states. The average age of these nuclear reactors is about 40 years old with most plants authorized to operate for another 20 years. The newest reactor in the fleet entered service in 2016, which was twenty years after the previous one began operation. There are two new reactors under construction in the U.S., Vogtle Units 3 and 4. The completion of these two units is many years behind schedule and the units are billions of dollars in excess of their initial estimated cost.

Renewed interest in nuclear power could result in the construction of new nuclear powered, carbon-free, electricity generation stations in the U.S. that would use smaller and more economical nuclear reactors. The deployment of small modular reactors could mean lower construction and electricity costs through the use of simpler power plant designs, standardized components and passive safety measures. Such plants could be built in less time than larger plants, utilize less space and represent a viable choice for reliable power to offset the intermittencies of renewable power sources. The increase by the U.S. in its use of nuclear power for electricity generation could have unfavorable effects on the demand for new natural gas-fired and additional renewable energy facilities in the future.

Nevertheless, we believe that the lower operating costs of natural gas-fired power plants, the higher energy generating efficiencies of modern gas turbines, and the requirements for grid resiliency should sustain the demand for modern combined cycle and simple cycle gas-fired power plants in the future. Natural gas is relatively clean burning, generally cost-effective, reliable and abundant. New gas-fired power plants incorporate major advances in gas-fired turbine technologies that have provided increased power plant efficiencies while providing the quick starting capabilities and the reliability that are necessary to balance the inherent intermittencies of wind and solar power plants.

We believe that the benefits of natural gas as a source of power are compelling, especially as a complement to the deployment of wind and solar powered energy sources, and that the future long-term prospects for natural gas-fired power plant construction remain generally favorable as natural gas continues to be the primary source for power generation in our country. The future availability of less carbon-intense and higher efficiency natural gas in the U.S. should be a significant factor in the economic assessment of future power generation capacity additions, although the pace of new opportunities emerging may be restrained and the starts of awarded EPC projects may be delayed or cancelled due to the challenges described above.

We also believe that it is also important to note that the plans for certain natural gas-fired power plant projects include the integration of hydrogen-burning capabilities. While the plants will initially burn natural gas alone, it is planned by the respective project owners that the plants will eventually burn a mixture of natural gas and green hydrogen, thereby establishing power-generation flexibility for these plants. We believe this is a winning combination that provides inexpensive and efficient power, enhances grid reliability and addresses clean-air concerns. The building of state-of-the-art power plants with flex-fuel capability replaces coal-fired power plants in the short term with relatively clean gas-fired electricity generation. Further, such additions to the power generation fleet provide the potential for the plants to burn 100% green hydrogen gas, which would provide both base load power and long duration backup power, when the sun is not shining or the wind is not blowing, for extended periods of time and without certain harmful air emissions.

It has been stated that the current scramble for electricity, regardless of source, caused by the Russian invasion of Ukraine has clarified that the 100% transition to renewable energy is in the distant future and has prompted, in part, renewed interest in not only carbon capture techniques, but carbon removal technologies as well. Carbon capture processes grab carbon from smokestacks and other sources of dense greenhouse gases, thereby reducing harmful emissions. Carbon-removal technologies are more demanding as they remove carbon out of the more diffuse open air in order to store it for centuries. Governments, including the U.S., are taking initial steps to boost this industry. The success of this industry could reduce the climate-change fear associated with natural gas-fired power plants.

The business footprint for TRC encompasses the Southeast region of the U.S. where there are many business-friendly local and state governments that welcome industrial production facilities. It is notable that significant events like the COVID-19 pandemic and the commitment to renewable energy in the U.S. are resulting in meaningful new business opportunities for TRC in its region. The national focus on infrastructure improvements, biotechnology advancements and energy storage have resulted in firms that are focused on these trends recently choosing TRC to participate in major construction projects in the region.

The foregoing discussion in this “Market Outlook” does focus on the state of the domestic power market as the EPC services business of GPS provides the predominant amount of our revenues. However, overseas power markets provide important new power construction opportunities for us especially across Ireland and the U.K.

While both of these countries are committed to the increase in energy consumption sourced from wind and the sun on the pathway to net zero emissions, there is a recognition that these sources of electrical power are inherently variable. Other technologies will be required to support these power sources and to provide electricity when power demands exceed the amount of electricity supplied by these renewables. The existence of the necessary power reserve will require conventional generation sources, typically natural gas-fired power plants but including nuclear power in the U.K. APC was awarded the significant Kilroot project late in Fiscal 2022 to build a clean burning natural gas-fired power plant in Northern Ireland so that existing coal-fired power sources there can be replaced.

The U.K. usually holds auctions for power capacity about four years in advance of the delivery date and another auction for a smaller amount of capacity around a year before delivery. Evidence of the power production realities in the U.K. are reflected in the results for Britain’s auction to ensure enough electricity capacity for 2022/2023 that were released in 2022. Capacity cleared at a record high price unlike the results for the most recent PJM capacity auctions. A total of nearly 5 gigawatts of capacity was procured in this auction, with nearly 70% of the power associated with gas-fired plants.

The Irish government has issued a policy statement on the security of the electricity supply in Ireland which confirms the requirement for the development of new support technologies to deliver on its commitment to have 80% of the country’s electricity generated from renewables by 2030. The report emphasizes that this will require a combination of conventional generation (typically powered by natural gas), interconnection to other jurisdictions, demand flexibility and other technologies such as battery storage and generation from renewable gases. The Irish government has approved that the development of new conventional generation (including gas-fired and gasoil distillate-fired generation) is a national priority and should be permitted and supported in order to ensure the security of electricity supply while supporting the growth of renewable electricity generation. In tandem with this strategic approach by the Irish government, a significant emphasis has been placed on the development of a green hydrogen policy to expand its role in the overall energy mix required. The work underway for the security of supply review of Ireland’s electricity and natural gas systems will be done in parallel with the development of the hydrogen strategy to ensure that long-term security needs take account of future hydrogen technologies. The investment in the production of green hydrogen correlates strongly with the rapidly developing Irish offshore wind sector and significant bankability signals under the wider European energy policy.

As noted above, APC entered into engineering and construction services contracts during Fiscal 2023 with the ESB to construct three 65 MW aero-derivative gas turbine flexible generation power plants around the city of Dublin, Ireland. All three projects are expected to operate intermittently during peak periods of electricity demand and as back-up supply options when renewable electricity generation is limited. Full construction activities are underway and the plants are scheduled to be completed by the end of Fiscal 2024.

Further, the Irish government recognized that the successful development of data centers in the country is a key aspect in promoting Ireland as a digital economy hot-spot in Europe. The stewards of the electricity supply in Ireland recognize that the large increase in electricity demand presented by the growth of the data center industry represents an evolving, significant risk to the security of the supply. Accordingly, guidelines have been published with the intent to protect both electricity consumers and the security of supply while continuing to allow data centers to connect to the electricity system. Assessment criteria for applications of data centers to obtain grid connections include, among other items, the ability of data center applicants to bring onsite dispatchable power generation (and/or storage) equivalent to or greater than their demand in order to support the security of supply. It is expected that any dispatchable on-site generation developed by data center operators will use natural gas as the primary fuel source combined with renewable technologies such as batteries and solar. The creation of these “energy parks” are seen as a key attraction to the continued investment into Ireland by both the data center providers and their tenants. APC recently completed a project to install natural gas-fired power generation for a major data center in the Dublin area.

APC is actively pursuing other new business opportunities in both the renewable and support sectors of power generation with its existing and new clients. The governments of Ireland and the U.K. have already made funds available to develop and support specific energy projects. APC is also in dialogue with several data center providers in relation to the development of on-site energy parks. The engineering and construction teams of APC are engaged in continuous discussions with particular stakeholders in certain of these other projects and APC’s management believes that it will be part of their eventual execution.

Over the past few years, GPS has provided top management guidance and project management expertise to APC as it completed its subcontract efforts for a biomass-burning power plant and won the awards of the projects to build new gas-fired power plant units near Belfast and Dublin. APC has provided manpower to GPS on several of its EPC services contracts. These recent experiences have demonstrated that the two companies can combine resources effectively. We believe that GPS and APC working together is a competitive advantage as we pursue emerging new business opportunities in Ireland and the U.K., based on the strength of the reputation of GPS for successfully completing large gas-fired power plant projects in the U.S. and the growing recognition in the power community in Ireland and the U.K. that APC is positioned and has the capability to build complex power facilities. Most recently, APC was provided with limited notices to proceed with EPC contract activities for an open-cycle gas turbine power facility to be built in central Ireland that will have the capacity to generate approximately 264 MW of temporary emergency electrical power. GPS is teaming with APC in the performance of this contract.

We are committed to the rational pursuit of new construction projects, including those with overseas locations and unique deployments of power-generation turbines, and the future growth of our revenues. This may result in additional decisions to make investments in the development and/or ownership of new projects. Because we believe in the strength of our balance sheet, we are willing to consider certain opportunities that include reasonable and manageable risks in order to assure the award of the related EPC or equipment installation services contracts to us.

The competitive landscape for our core EPC services business related to natural gas-fired power plants in the U.S. remains dynamic, although there are fewer competitors for new gas-fired power plant EPC services project opportunities. Several major competitors have exited the market for a variety of reasons or have been acquired. Others have announced intentions to avoid entering into fixed-price contracts. Nonetheless, the competition for new utility-scale gas-fired power plant construction opportunities is fierce and still includes multiple global firms. We believe that the Company has a reputation as an accomplished, dependable and cost-effective provider of EPC and other large project construction contracting services. With the proven ability to deliver completed power facilities, particularly combined cycle, natural gas-fired power plants, we are focused on expanding our position in the power markets of the U.S., Ireland and the U.K. where we expect investments to be made based on forecasts of electricity demand covering decades into the future. We believe that our expectations are valid and that our plans for the future continue to be based on reasonable assumptions.

### Comparison of the Results of Operations for the Three Months Ended April 30, 2023 and 2022

We reported net income of $2.1 million, or $0.16 per diluted share, for the three months ended April 30, 2023. For the comparable period of the prior year, we reported net income of $7.5 million, or $0.50 per diluted share.

The following schedule compares our operating results for the three months ended April 30, 2023 and 2022 (dollars in thousands):

| ​ ​ ​ REVENUES | ​ ​ | ​ ​ Three Months Ended April 30, 2023 ​ | ​ | ​ ​ 2022 ​ | ​ | ​ ​ $ Change ​ | ​ | ​ ​ ​ % Change ​ ​ |
| --- | --- | ---: | --- | ---: | --- | ---: | --- | ---: |
| Power industry services | ​ | $70,176 | ​ | $73,949 | ​ | $(3,773) |  | (5.1)% |
| Industrial fabrication and field services | ​ | 30,307 | ​ | 22,501 | ​ | 7,806 |  | 34.7 ​ |
| Telecommunications infrastructure services | ​ | 3,192 | ​ | 3,827 | ​ | (635) |  | (16.6) ​ |
| Revenues | ​ | 103,675 | ​ | 100,277 | ​ | 3,398 |  | 3.4 ​ |
| **COST OF REVENUES** | ​ |  | ​ |  | ​ |  |  | ​ |
| Power industry services | ​ | 60,335 | ​ | 59,035 | ​ | 1,300 |  | 2.2 ​ |
| Industrial fabrication and field services | ​ | 26,562 | ​ | 18,680 | ​ | 7,882 |  | 42.2 ​ |
| Telecommunications infrastructure services | ​ | 2,554 | ​ | 2,824 | ​ | (270) |  | (9.6) ​ |
| Cost of revenues | ​ | 89,451 | ​ | 80,539 | ​ | 8,912 |  | 11.1 ​ |
| **GROSS PROFIT** | ​ | 14,224 | ​ | 19,738 | ​ | (5,514) |  | (27.9) ​ |
| Selling, general and administrative expenses | ​ | 10,591 | ​ | 10,575 | ​ | 16 |  | 0.2 ​ |
| **INCOME FROM OPERATIONS** | ​ | 3,633 | ​ | 9,163 | ​ | (5,530) |  | (60.4) ​ |
| Other (loss) income, net | ​ | (629) | ​ | 595 | ​ | (1,224) |  | NM ​ |
| **INCOME BEFORE INCOME TAXES** | ​ | 3,004 | ​ | 9,758 | ​ | (6,754) |  | (69.2) ​ |
| Income tax expense | ​ | 895 | ​ | 2,273 | ​ | (1,378) |  | (60.6) ​ |
| **NET INCOME** | ​ | $2,109 | ​ | $7,485 | ​ | $(5,376) | ​ | (71.8)% |

### Revenues

### Power Industry Services

The revenues of the power industry services segment, representing the businesses of GPS and APC, decreased by 5.1%, or $3.8 million, to $70.2 million for the three months ended April 30, 2023 compared with revenues of $73.9 million for the three months ended April 30, 2022 as the quarterly construction activities associated with the Guernsey Power Station project, Maple Hill Solar energy facility and Equinix data center project are generally near or at completion. The reduction in revenues between the quarters was partially offset by increasing revenues at several projects including the Trumbull Energy Center, the ESB FlexGen peaker plants, the Kilroot Power Station and the initial phases of another power plant project in Ireland. The revenues of this business segment represented approximately 67.7% of consolidated revenues for the quarter ended April 30, 2023 and 73.7% of consolidated revenues for the corresponding prior year quarter.

The primary driver for the revenues of this segment for the three months ended April 30, 2022 were the revenues associated with the construction of the Guernsey Power Station as the construction activities on this project were at peak levels.

### Industrial Fabrication and Field Services

The revenues of our industrial fabrication and field services segment, representing the business of TRC, increased by $7.8 million, or 34.7%, to $30.3 million for the three months ended April 30, 2023 compared to revenues of $22.5 million for the three months ended April 30, 2022 as the amounts of field services and vessel fabrication work increased between periods. For the three months ended April 30, 2023 and 2022, the revenues of this segment represented 29.2% and 22.4% of consolidated revenues for the corresponding periods.

The major customers of TRC include some of North America’s largest fertilizer producers, as well as other chemical, mining, forest products, construction and energy companies with plants, facilities and other sites located primarily in the Southeast region of the U.S.

### Telecommunications Infrastructure Services

The revenue results of this business segment, which represent the business of SMC, were $3.2 million for the three-month period ended April 30, 2023, a decrease of $0.6 million, or 16.6%, from the amount of revenues earned during the three months ended April 30, 2022.

### Cost of Revenues

With the increase in consolidated revenues for the three months April 30, 2023 compared with last year’s first quarter ended April 30, 2022, the consolidated cost of revenues also increased between the quarters. These costs were $89.5 million and $80.5 million for the three-month periods ended April 30, 2023 and 2022, respectively, representing an increase of approximately 11.1%.

For the three-month period ended April 30, 2023, we reported a consolidated gross profit of approximately $14.2 million which represented a gross profit percentage of approximately 13.7% of corresponding consolidated revenues, a decrease from the three-month period ended April 30, 2022 primarily due to changes in our revenue mix, the reversal of previously recorded profit on a project by APC and a loss incurred by TRC on one of its projects. The gross profit percentages of corresponding revenues for the power industry services, industrial fabrication and field services and the telecommunications infrastructure services segments were 14.0%, 12.4% and 20.0%, respectively, for the quarter ended April 30, 2023.

Our consolidated gross profit reported for the three-month period ended April 30, 2022 was $19.7 million, which represented a gross profit percentage of approximately 19.7% of corresponding consolidated revenues. The gross profit percentages of corresponding revenues for the power industry services, industrial fabrication and field services and the telecommunications infrastructure services segments were 20.2%, 17.0% and 26.2%, respectively, for the quarter ended April 30, 2022.

### Selling, General and Administrative Expenses

These costs remained stable at $10.6 million during each of the three months ended April 30, 2023 and 2022, and represented 10.2% and 10.5% of corresponding consolidated revenues, respectively.

### Other (Loss) Income, Net

Other loss, net, for the three months ended April 30, 2023 was $0.6 million, which reflected the wire-transfer fraud loss that occurred on March 7, 2023 in the amount of $3.0 million and the related legal, audit and other professional fees in the amount of $0.2 million that were incurred in the investigation and reporting of this event, and the conduct of loss-recovery efforts (see Note 15 to the accompanying condensed consolidated financial statements). The total amount of $3.2 million was offset partially by income earned during the period on funds invested in money market accounts, CDs and U.S. Treasury notes in the total amount of approximately $2.4 million, as investment returns are meaningfully higher this year.

We reported other income, net, in the amount of $0.6 million for the three months ended April 30, 2022, which included primarily earnings associated with our solar fund investments.

### Income Taxes

We incurred income tax expense for the three months ended April 30, 2023 in the amount of approximately $0.9 million, which reflects a currently estimated annual effective income tax rate of 25.3%. This estimated tax rate differs from the statutory federal tax rate of 21% due primarily to the unfavorable estimated effects of state income taxes and permanent differences, including certain nondeductible executive compensation and an increased amount of global intangible low taxed income (“GILTI”) for the current year. For the three months ended April 30, 2022, we reported income tax expense in the amount of approximately $2.3 million, which reflected an estimated annual effective income tax rate of 23.7% for the period.

### Liquidity and Capital Resources as of April 30, 2023

At April 30 and January 31, 2023, our balances of cash and cash equivalents were $195.9 million and $173.9 million, respectively, which represented an increase of $22.0 million.

The net amount of cash used in operating activities for the three months ended April 30, 2023 was $1.2 million. Our net income for the three months ended April 30, 2023, adjusted favorably by the net amount of non-cash income and expense items, represented a source of cash in the total amount of $5.4 million. The reduction in the balance of contract assets of $19.9 million, represented a source of cash and was primarily due to project retentions being moved to contract receivables as the Guernsey Power Station reached substantial completion during the period. The $10.6 million increase in contract receivables during the period represented a use of cash, primarily due to GPS and TRC project billings and, as previously mentioned, the reclassification of project retentions related to the Guernsey Power Station. The increase in contract liabilities of $15.0 million represented a source of cash, primarily due to the net effect of the early phase of construction activities on a GPS project and post peak phase of certain APC projects. However, reductions in the combined level of accounts payables and accrued expenses in the amount of $26.9 million and the increase of other assets of $4.1 million, represented uses of cash during the period.

During the three months ended April 30, 2023, our primary source of cash from investing activities was the net maturities of our short-term investments, which consist entirely of CDs issued by the Bank, in the amount of $59.8 million. We used $30.4 million of these proceeds to invest in available-for-sale securities of U.S. Treasury notes. We also used $0.6 million to make capital expenditures.

For the three months ended April 30, 2023, we used $6.5 million cash in financing activities, including $3.7 million used to repurchase shares of common stock and $3.4 million used for the payment of regular cash dividends. We received proceeds from the exercise of stock options in the amount of $0.5 million, which represented a source of cash. As of April 30, 2023, there were no restrictions with respect to intercompany payments between the holding company, GPS, TRC, APC and SMC.

During the three months ended April 30, 2022, our balance of cash and cash equivalents decreased by a net amount of $158.2 million and our working capital decreased by $22.9 million to $261.3 million as of April 30, 2022. The net amount of cash used in operating activities for the three months ended April 30, 2022 was $39.7 million. Our net income for the period, adjusted favorably by the net amount of non-cash income and expense items, represented a source of cash in the total amount of $9.8 million. However, reductions in the balance of contract liabilities and the combined level of accounts payable and accrued expenses in the amounts of $20.9 million and $15.2 million, respectively, represented uses of cash. Both of these reductions related primarily to the decline in the construction activity of the Guernsey Power Station project. Likewise, the increases in the amounts of accounts receivable, contract assets, prepaid expenses and other assets, in the total of $13.3 million, represented uses of cash during the period.

During the three months ended April 30, 2022, we also used cash to increase the level of our short-term investments, which consisted entirely of CDs issued by the Bank, by $85.0 million. We also used $30.7 million cash in financing activities during the three months ended April 30, 2022, including $27.1 million used to repurchase shares of our common stock, and $3.7 million used for the payment of regular cash dividends.

At April 30, 2023, a portion of our balance of cash and cash equivalents was invested in certificates of deposit and money market funds with most of its net assets invested in cash, U.S. Treasury obligations and repurchase agreements secured by U.S. government obligations. The major portion of our domestic operating bank account balances are maintained with the Bank. We do maintain certain Euro-based bank accounts in Ireland and certain pound sterling-based bank accounts in the U.K. in support of the operations of APC.

In order to monitor the actual and necessary levels of liquidity for our business, we focus on net liquidity, or working capital, in addition to our cash balances. During the three months ended April 30, 2023, our net liquidity decreased by $3.6 million to $232.6 million as of April 30, 2023 from $236.2 million as of January 31, 2023, due primarily to common stock repurchases and the payment of cash dividends, partially offset by our net income for the period. As we have no debt service, as our fixed asset acquisitions in a reporting period are typically low, and as our net liquidity includes our short-term investments and available-for-sale U.S. Treasury notes, our levels of working capital are not subjected to the volatility that affects our levels of cash and cash equivalents.

During April 2021, we amended our Credit Agreement with the Bank which extended the expiration date of the Credit Agreement to May 31, 2024 and reduced the borrowing rate. On March 6, 2023, we entered into the Second Amendment to the Credit Agreement. The Second Amendment modified the Credit Agreement to, primarily, replace the interest pricing with a rate of SOFR plus 1.6% and add SOFR successor rate language. The Credit Agreement, as amended, includes the following features, among others: a lending commitment of $50.0 million including a revolving loan and an accordion feature which allows for an additional commitment amount of $10.0 million, subject to certain conditions. Additionally, the Credit Agreement, as amended, continues to include customary terms, covenants and events of default for a credit facility of its size and nature.

We may also use the borrowing ability to cover other credit instruments issued by the Bank for our use in the ordinary course of business as defined by the Bank. At April 30, 2023, we had no outstanding borrowings. However, the Bank has issued letters of credit in the total outstanding amount of $11.5 million in support of the activities of APC under new customer contracts.

We have pledged the majority of our assets to secure the financing arrangements. The Bank’s consent is not required for acquisitions, divestitures, cash dividends or significant investments as long as certain conditions are met. The Credit Agreement, as amended, requires that we comply with certain financial covenants at our fiscal year-end and at each fiscal quarter-end, and includes other terms, covenants and events of default that are customary for a credit facility of its size and nature, including a requirement to achieve positive adjusted earnings before interest, taxes, depreciation and amortization, as defined, over each rolling twelve-month measurement period. At April 30, 2023, we were compliant with the covenants of the Credit Agreement, as amended.

In the normal course of business and for certain major projects, we may be required to obtain surety or performance bonding, to provide parent company guarantees, or to cause the issuance of letters of credit (or some combination thereof) in order to provide performance assurances to clients on behalf of one of our subsidiaries.

If our services under a guaranteed project would not be completed or would be determined to have resulted in a material defect or other material deficiency, then we could be responsible for monetary damages or other legal remedies. As is typically required by any surety bond, we would be obligated to reimburse the issuer of any surety bond provided on behalf of a subsidiary for any cash payments made thereunder. The commitments under performance bonds generally end concurrently with the expiration of the related contractual obligation. Not all of our projects require bonding.

As of April 30, 2023 and January 31, 2023, the estimated amounts of the Company’s unsatisfied bonded performance obligations, covering all of its subsidiaries, were approximately $0.5 billion and $0.6 billion, respectively. As of April 30, 2023 and January 31, 2023, the outstanding amounts of bonds covering other risks, including warranty obligations related to completed activities, were not material. Not all of our projects require bonding.

We have also provided a financial guarantee in the amount of $3.6 million to support certain project developmental efforts. A liability was established for the estimated loss related to this guarantee during Fiscal 2022.

When sufficient information about claims related to performance on projects would be available and monetary damages or other costs or losses would be determined to be probable, we would record such losses. As our subsidiaries are wholly-owned, any actual liability related to contract performance is ordinarily reflected in the financial statement account balances determined pursuant to the Company’s accounting for contracts with customers. Any amounts that we may be required to pay in excess of the estimated costs to complete contracts in progress as of April 30, 2023 are not estimable.

The Company made prior year investments of approximately $6.3 million in limited liability companies that make equity investments in solar energy projects that are eligible to receive energy tax credits. It is likely that we will evaluate opportunities to make other solar energy investments of this type in the future.

We believe that cash on hand, our cash equivalents, cash that will be provided from the maturities of short-term investments and sales of debt securities and cash generated from our future operations, with or without funds available under our Credit Agreement, as amended, will be adequate to meet our general business needs in the foreseeable future. In general, we maintain significant liquid capital in our consolidated balance sheet to ensure the maintenance of our bonding capacity and to provide parent company performance guarantees for EPC and other construction projects.

However, any significant future acquisition, investment or other unplanned cost or cash requirement, may require us to raise additional funds through the issuance of debt and/or equity securities. There can be no assurance that such financing will be available on terms acceptable to us, or at all.

### Earnings before Interest, Taxes, Depreciation and Amortization (“EBITDA”)

The table following immediately below presents the determinations of EBITDA for the three months ended April 30, 2023 and 2022, respectively (amounts in thousands).

| ​ ​ ​ ​ | ​ ​ ​ | ​ ​ Three Months Ended April 30, 2023 | ​ | ​ ​ 2022 |
| --- | --- | ---: | --- | ---: |
| Net income, as reported | ​ | $2,109 | ​ | $7,485 |
| Income tax expense | ​ | 895 | ​ | 2,273 |
| Depreciation | ​ | 547 | ​ | 809 |
| Amortization of intangible assets | ​ | 98 | ​ | 166 |
| EBITDA | ​ | $3,649 | ​ | $10,733 |

We believe that EBITDA is a meaningful presentation that enables us to assess and compare our operating performance on a consistent basis by removing from our operating results the impacts of our capital structure, the effects of the accounting methods used to compute depreciation and amortization and the effects of operating in different income tax jurisdictions. Further, we believe that EBITDA is widely used by investors and analysts as a measure of performance.

However, as EBITDA is not a measure of performance calculated in accordance with U.S. GAAP, we do not believe that this measure should be considered in isolation from, or as a substitute for, the results of our operations presented in accordance with U.S. GAAP that are included in our condensed consolidated financial statements. In addition, our EBITDA does not necessarily represent funds available for discretionary use and is not necessarily a measure of our ability to fund our cash needs.

### Critical Accounting Policies

Critical accounting policies are those related to the areas where we have made what we consider to be particularly subjective or complex judgments in arriving at estimates and where these estimates can significantly impact our financial results under different assumptions and conditions.

These estimates, judgments, and assumptions affect the reported amounts of assets, liabilities and equity, the disclosure of contingent assets and liabilities at the date of financial statements and the reported amounts of revenues and expenses during the reporting periods. We base our estimates on historical experience and various other assumptions that we believe are reasonable under the circumstances, the results of which form the basis for making judgments about the carrying value of assets, liabilities and equity that are not readily apparent from other sources. Actual results and outcomes could differ from these estimates and assumptions. We do periodically review these critical accounting policies and estimates with the audit committee of our board of directors.

We consider the accounting policies related to revenue recognition on long-term construction contracts; income tax reporting; and the financial reporting associated with any significant claims or legal matters to be most critical to the understanding of our financial position and results of operations. An expanded discussion of our critical accounting policies is included in Item 7 of Part II of our Annual Report. During the three months ended April 30, 2023, there have been no material changes in the way we apply the critical accounting policies described therein.

### Recently Issued Accounting Pronouncements

Other than ASU 2023-02 that is related to the accounting for investment tax credits and that is discussed in Note 1 to the accompanying condensed consolidated financial statements, there are no recently issued accounting pronouncements that have not yet been adopted that we believe may be material to our consolidated financial statements.

## Market risk

As filed, 5,068 characters.

In the normal course of business, our results of operations may be subject to risks related to fluctuations in interest rates. As of April 30, 2023, we had no outstanding borrowings under our financing arrangements with the Bank (see Note 6 to the accompanying condensed consolidated financial statements), which provide a revolving loan with a maximum borrowing amount of $50.0 million that is available until May 31, 2024 with interest at SOFR plus 1.6%. During the three months ended April 30, 2023 and 2022, we did not enter into any material derivative financial instruments for trading, speculation or other purposes that would expose us to market risk.

We maintain a substantial amount of our temporarily investable cash in certificates of deposit, a money market fund and U.S. Treasury notes (see Note 3 of the accompanying condensed consolidated financial statements). As of April 30, 2023, the weighted average number of days remaining until maturity for the certificates of deposit, money market funds and U.S Treasury notes was 388 days. The weighted average annual interest rate of our certificates of deposit of $100.0 million, the money market funds balance of $112.5 million, and the U.S. Treasury notes face value of $30.0 million was 4.89%. To illustrate the potential impact of changes in the overall interest rate associated with our investable cash balance at April 30, 2023 on our annual results of operations, we present the following hypothetical analysis. It assumes that our condensed consolidated balance sheet as of April 30, 2023 remains constant, and no further actions are taken to alter our existing interest rate sensitivity, including reinvestments (dollars in thousands).

| ​ ​ Basis Point Change | ​ ​ | ​ ​ Increase (Decrease) in Interest Income | ​ ​ | ​ ​ Increase (Decrease) in Interest Expense | ​ ​ | ​ ​ Net Increase (Decrease) in Income (Pre-Tax) |
| --- | --- | ---: | --- | ---: | --- | ---: |
| Up 300 basis points | ​ | $7,731 | ​ | $— | ​ | $7,731 |
| Up 200 basis points | ​ | ​ 5,154 | ​ | ​ — | ​ | ​ 5,154 |
| Up 100 basis points | ​ | 2,577 | ​ | — | ​ | 2,577 |
| Down 100 basis points | ​ | ​ (2,577) | ​ | ​ — | ​ | ​ (2,577) |
| Down 200 basis points | ​ | ​ (5,154) | ​ | ​ — | ​ | ​ (5,154) |
| Down 300 basis points | ​ | (7,731) | ​ | — | ​ | (7,731) |

With the consolidation of APC, we are subject to the effects of translating the financial statements of APC from its functional currency (Euros) into our reporting currency (U.S. dollars). The effects of translation are recognized in accumulated other comprehensive loss, which is net of tax when applicable. APC remeasures transactions and subsidiary financial statements denominated in local currencies to Euros. Gains and losses on the remeasurements are recorded in the other (loss) income line of our condensed consolidated statement of earnings.

In the “Risk Factors” section of our Annual Report, we included discussion of the risks to our fixed price contracts if actual contract costs rise above the estimated amounts of such costs that support corresponding contract prices. Identified as factors that could cause contract cost overruns, project delays or other unfavorable effects on our contracts, among other circumstances and events, are delays in the scheduled deliveries of machinery and equipment ordered by us or project owners, unforeseen increases in the costs of labor, warranties, raw materials, components or equipment or the failure or inability to obtain resources when needed.

We are subject to fluctuations in prices for commodities including steel products, copper, concrete and fuel. Although we attempt to secure firm quotes from our suppliers, we generally do not hedge against increases in prices for these commodities. Commodity price risks may have an impact on our results of operations due to the fixed-price nature of many of our contracts. We attempt to include the anticipated amounts of price increases or decreases in the costs of our bids. In times of increased supply cost volatility, we may take other steps to reduce our risks. For example, we may hold quotes related to materials in our industrial fabrication and field services segment for very short periods. For major fixed price contracts in our power industry services segment, we may mitigate material cost risks by procuring the majority of the equipment and construction supplies during the early phases of a project. The profitability of our active jobs has not suffered meaningfully from the periodic global surges in non-residential construction material costs.

Our operations have been challenged by the well-publicized global supply chain disruptions. While management of the risks associated with the inability to obtain machinery, equipment and other materials when needed continues to require our best efforts, we are concerned that the supply chain uncertainties may be impacting project owners’ confidence in commencing new work which may adversely affect our expected levels of revenues until the supply chain disruptions dissipate.

## Controls and procedures

As filed, 1,715 characters.

**Evaluation of disclosure controls and procedures.** Our management, with the participation of our chief executive officer and chief financial officer, evaluated the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934 (the “Exchange Act”)) as of April 30, 2023.

Management recognizes that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving their objectives, and management necessarily applies its judgment in evaluating the cost-benefit relationship of possible controls and procedures. Based on the evaluation of our disclosure controls and procedures as of April 30, 2023, our chief executive officer and chief financial officer concluded that, as of such date, our disclosure controls and procedures were effective to provide reasonable assurance that information required to be disclosed in our Exchange Act reports is recorded, processed, summarized, and reported within the time periods specified by the SEC, and the material information related to the Company and its consolidated subsidiaries is made known to management, including the chief executive officer and chief financial officer, to allow timely decisions regarding required disclosure in the reports.

**Changes in internal controls over financial reporting.** There have been no significant changes in our internal control over financial reporting (as defined in Rules 13a-15 and 15d-15 under the Exchange Act) during the fiscal quarter ended April 30, 2023 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

Filed Jun 8, 2023.