# Fuelcell Energy Inc: Form 10-Q for the period ended Jan 31, 2019

- Company: [Fuelcell Energy Inc](/companies/fcel.md) (CIK 886128)
- Form: 10-Q
- Filed: 2019-03-07
- Accepted by EDGAR: Mar 7, 2019, 08:36 ET
- Period: 2019-01-31
- Accession: 0001564590-19-006637
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/886128/000156459019006637/fcel-10q_20190131.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/886128/000156459019006637/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2019-01-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2018-11-01 to 2019-01-31 | $17.8m | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 3 months, 2018-11-01 to 2019-01-31 | $20.0m | us-gaap:CostOfGoodsAndServicesSold |
| Gross profit | 3 months, 2018-11-01 to 2019-01-31 | −$2.2m | us-gaap:GrossProfit |
| Research and development | 3 months, 2018-11-01 to 2019-01-31 | $6.3m | us-gaap:ResearchAndDevelopmentExpense |
| Selling, general and administrative | 3 months, 2018-11-01 to 2019-01-31 | $6.8m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months, 2018-11-01 to 2019-01-31 | −$15.2m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2018-11-01 to 2019-01-31 | $2.5m | us-gaap:InterestExpense |
| Income tax | 3 months, 2018-11-01 to 2019-01-31 | $0 | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2018-11-01 to 2019-01-31 | −$17.5m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2018-11-01 to 2019-01-31 | −$0.33 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2018-11-01 to 2019-01-31 | −$0.33 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2018-11-01 to 2019-01-31 | 99,860,421 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2018-11-01 to 2019-01-31 | −$12.0m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2018-11-01 to 2019-01-31 | $1.6m | us-gaap:PaymentsToAcquireProductiveAssets |
| Cash and equivalents | at 2019-01-31 | $27.8m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2019-01-31 | $117.1m | us-gaap:AssetsCurrent |
| Total assets | at 2019-01-31 | $346.0m | us-gaap:Assets |
| Current liabilities | at 2019-01-31 | $88.0m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2019-01-31 | $192.9m | us-gaap:Liabilities |
| Current portion of debt | at 2019-01-31 | $38.9m | us-gaap:DebtCurrent |

## Management's discussion and analysis

As filed, 86,638 characters.

### FORWARD-LOOKING STATEMENTS

This Quarterly Report on Form 10-Q (including exhibits and any information incorporated by reference herein) contains both historical and forward-looking statements that involve risks, uncertainties and assumptions. The statements contained in this report that are not purely historical are forward-looking statements that are subject to the safe harbors created under the Securities Act of 1933, as amended, and the Securities Exchange Act of 1934, as amended, including statements regarding our expectations, beliefs, intentions and strategies for the future. When used in this report, the words “expects,” “anticipates,” “estimates,” “projects,” “intends,” “plans,” “believes,” “predicts,” “should,” “will”, “could”, “would”, “may”, “forecast”, and similar expressions and variations of such words are intended to identify forward-looking statements. Such statements relate to, among other things, the following: (i) the development and commercialization by FuelCell Energy, Inc. and its subsidiaries of fuel cell technology and products and the market for such products; (ii) expected operating results such as revenue growth and earnings; (iii) our belief that we have sufficient liquidity to fund our business operations for the next 12 months; (iv) future funding under Advanced Technologies contracts; (v) future financing for projects including publicly issued bonds, equity and debt investments by investors and commercial bank financing; (vi) the expected cost competitiveness of our technology; and (vii) our ability to achieve our sales plans and cost reduction targets.

The forward-looking statements contained in this report are subject to risks and uncertainties, known and unknown, that could cause actual results to differ materially from those forward-looking statements, including the risks contained in our Annual Report on Form 10-K for the fiscal year ended October 31, 2018 in the section entitled “Item 1A. Risk Factors,” and the following: general risks associated with product development and manufacturing; general economic conditions; changes in the utility regulatory environment; changes in the utility industry and the markets for distributed generation, distributed hydrogen, and carbon capture configured fuel cell power plants; potential volatility of energy prices; availability of government subsidies and economic incentives for alternative energy technologies; our ability to remain in compliance with U.S. federal and state and foreign government laws and regulations; rapid technological change; competition; our dependence on strategic relationships; market acceptance of our products; changes in accounting policies or practices adopted voluntarily or as required by accounting principles generally accepted in the United States,; factors affecting our liquidity position and financial condition; government appropriations; the ability of the government to terminate its development contracts at any time; the ability of the government to exercise “march-in” rights with respect to certain of our patents; recent developments with POSCO Energy, which may limit our efforts to access the South Korean and Asian markets and could expose us to costs of arbitration or litigation proceedings; our ability to implement our strategy; our ability to reduce our levelized cost of energy and our cost reduction strategy generally; our ability to protect our intellectual property; litigation and other proceedings; the risk that commercialization of our products will not occur when anticipated; our need for and the availability of additional financing; our ability to generate positive cash flow from operations; our ability to service our long-term debt; our ability to increase the output and longevity of our power plants and our ability to expand our customer base and maintain relationships with our largest customers and strategic business allies.

We cannot assure you that we will be able to meet any of our development or commercialization schedules; any of our new products or technology, once developed, will be commercially successful; our existing SureSource power plants will remain commercially successful; the government will appropriate the funds anticipated by us under our government contracts; the government will not exercise its right to terminate any or all of our government contracts; or we will be able to achieve any other result anticipated in any other forward-looking statement contained herein.

Investors are cautioned that any such forward-looking statements are not guarantees of future performance and involve risks and uncertainties, many of which are beyond our ability to control, and that actual results may differ materially from those projected in the forward-looking statements as a result of various factors discussed herein.

Management’s Discussion and Analysis of Financial Condition and Results of Operations is provided as a supplement to the accompanying financial statements and footnotes to help provide an understanding of our financial condition, changes in our financial condition and results of operations. The preparation of financial statements and related disclosures requires management to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and the disclosure of contingent assets and liabilities. Actual results could differ from those estimates. Estimates are used in accounting for, among other things, revenue recognition, contract loss accruals, excess, slow-moving and obsolete inventories, product warranty accruals, loss accruals on service agreements, share-based compensation expense, allowance for doubtful accounts, depreciation and amortization, impairment of goodwill and in-process research and development intangible assets, impairment of long-lived assets (including project assets), income taxes and contingencies. Estimates and assumptions are reviewed periodically, and the effects of revisions are reflected in the consolidated financial statements in the period they are determined to be necessary. Due to the inherent uncertainty involved in making estimates, actual results in future periods may differ from those estimates. The following discussion should be read in conjunction with information included in our Annual Report on Form 10-K for the fiscal year ended October 31, 2018 filed with the SEC. Unless otherwise indicated, the terms “Company”, “FuelCell Energy”, “we”, “us”, and “our” refer to FuelCell Energy, Inc. and its subsidiaries. All tabular dollar amounts are in thousands.

### OVERVIEW AND RECENT DEVELOPMENTS

### Overview

FuelCell Energy develops and delivers efficient, affordable and clean solutions for the supply, recovery and storage of energy. We design, manufacture, undertake project development of, install, operate and maintain megawatt-scale fuel cell systems, serving utilities and industrial and large municipal power users with solutions that include both utility-scale and on-site power generation, as well as advancing development of solutions for carbon capture, local hydrogen production for transportation and industrial users, and long duration energy storage. Our plants are operating in more than 50 locations on three continents and have generated more than 8.0 million megawatt hours (MWh) of electricity.

We provide comprehensive turn-key power generation solutions to our customers, including multi-year power purchase agreements (“PPAs”), power plant installation, operations and maintenance under multi-year service agreements. We both develop projects as well as sell equipment directly to customers, providing either a complete solution of engineering, installing and servicing the fuel cell power plant, or selling the power plant equipment and providing long-term maintenance only. We offer to arrange financing structures that enable power users to benefit from the multitude of advantages of clean onsite power while avoiding an up-front capital investment. Utilizing long-term PPAs or lease structures, the end-user of the power hosts the installation and only pays for power as it is delivered. For projects that we develop, the end user of the power typically enters into a PPA, and we have the option to either identify a project investor to purchase the power plant and assume the PPA, or retain the project and recognize electricity revenue over the term of the PPA. We target large-scale power users with our megawatt-class installations. To provide a frame of reference, one megawatt is adequate to continually power approximately 1,000 average sized U.S. homes. Our customer base includes utility companies, municipalities, universities, hospitals, government entities and a variety of industrial and commercial enterprises. Our leading geographic markets are the United States and South Korea, and we are pursuing expanding opportunities in other countries around the world.

Our value proposition is to enable economic returns with clean, affordable, reliable and resilient fuel cell power plants that supply power where consumed. Our products can also be configured for carbon capture, energy recovery and storage applications. Our solutions are easy-to-site in populated areas as they are clean, operate quietly and without vibrations, and have only modest space requirements. Fuel cells use an electrochemical process to convert a fuel source into electricity and heat in a highly efficient process that emits virtually no pollutants as the fuel is not burned, generating power that is almost wholly absent of criteria pollutants such as nitrogen oxide that causes smog, sulfur oxide that contributes to acid rain, and particulate matter that can aggravate asthma. Locating power generation near the point of use reduces reliance on the transmission grid, leading to enhanced energy security and power reliability. Utilities can minimize or even avoid the cost of transmission or other infrastructure by adopting distributed generation, which saves their customers the cost of installing and maintaining transmission and also avoids the losses associated with transmitting electricity over great distances. Our power plants provide electricity priced competitively to grid-delivered electricity in certain high cost regions, and our strategy is to continue to reduce costs, which we believe will lead to wider adoption.

### Recent Developments

#### Construction Loan Agreement

On February 28, 2019, we, through our indirect wholly-owned subsidiary Groton Station Fuel Cell, LLC (“Groton Borrower”), entered into a Construction Loan Agreement (the “Construction Loan Agreement”) with Fifth Third Bank (“Fifth Third”) pursuant to which Fifth Third agreed to make available to Groton Borrower a construction loan facility in an aggregate principal amount of up to $23.0 million (the “Groton Facility”) to fund the manufacture, construction, installation, commissioning and start-up of the 7.4 megawatt fuel cell power plant for the Connecticut Municipal Electric Energy Cooperative located on the U.S. Navy submarine base in Groton, Connecticut (the “Groton Project”). Groton Borrower made an initial draw under the Groton Facility on the date of closing of $9.6 million.

Amounts borrowed under the Groton Facility bear interest at a rate equal to the sum of the one-month LIBOR Rate plus 2.25 %. Regular monthly payments are interest-only. Amounts borrowed under the Groton Facility may be prepaid at any time without penalty. The maturity date of the Groton Facility will be the earlier of (a) October 31, 2019, (b) the commercial operation date of the Groton Project, or (c) one business day after receipt of proceeds of debt financing (i.e., take out financing) in an amount sufficient to repay the outstanding indebtedness under the Groton Facility. Mandatory prepayments are required in the event of material damage or destruction to the Groton Project or a change of control of Groton Borrower.

We have agreed to guarantee Groton Borrower’s obligations under the Construction Loan Agreement. In addition, Groton Borrower’s obligations under the Construction Loan Agreement are secured by a first mortgage lien on Groton Borrower’s leasehold interest in the

Groton Project site, a security interest in the Groton Project assets, including material Groton Project related contracts such as the power purchase agreement and EPC agreement, and our equity interest in the Groton Borrower.

The Construction Loan Agreement contains customary representations and warranties, affirmative and negative covenants, and events of default that entitle Fifth Third to cause the indebtedness under the Groton Facility to become immediately due and payable.

#### Amendment to Hercules Loan and Security Agreement

On February 28, 2019, we and Hercules (and various affiliated entities) entered into the sixth amendment to the loan and security agreement (such amendment, the “Hercules Amendment”), which is effective as of February 22, 2019. Under the Hercules Amendment, we are required, at all times following February 22, 2019 through March 31, 2019, to maintain an unrestricted cash balance of at least (a) 50% of the outstanding loan balance, plus (b) the amount of accounts payable (as defined under GAAP) not paid within 90 days of the invoice date, in accounts subject to an account control agreement in favor of Hercules. Further, at all times after March 31, 2019, we are required to maintain an unrestricted cash balance of at least (a) 75% of the outstanding loan balance, plus (b) the amount of accounts payable (as defined under GAAP) not paid within 90 days of the invoice date, in accounts subject to an account control agreement in favor of Hercules. In addition, in the event of prepayment, the Hercules Amendment requires the payment of a prepayment charge equal to the following percentage of the advance amount being prepaid: (a) if such advance amounts are prepaid in any of the first twelve months following February 22, 2019, 2.00%, and (b) thereafter, 1.00%. In connection with the execution of the Hercules Amendment, we paid a $250,000 non-refundable fee to Hercules.

#### Waiver Agreement

On February 21, 2019, we entered into a waiver agreement (the “Waiver Agreement”) with the sole remaining holder of our Series C Convertible Preferred Stock (such holder, the “Series C Holder” and such stock, the “Series C Preferred Stock”). Under the Waiver Agreement, the Series C Holder waived any equity conditions failures that may have occurred under the Certificate of Designations, Preferences and Rights of the Series C Preferred Stock (the “Series C Certificate of Designations”). The Series C Holder further waived any triggering event occurring after the date of the Waiver Agreement, as well as its right to demand, require or otherwise receive cash payments under the Series C Certificate of Designations, which waiver will terminate upon the occurrence of certain key triggering events, the occurrence of a fundamental transaction, a breach of the Waiver Agreement, or the occurrence of a bankruptcy triggering event. In addition, we agreed in the Waiver Agreement, pursuant to Section 8(d) of the Series C Certificate of Designations, to adjust the conversion price of the Series C Preferred Stock in connection with future conversions, such that, when the Series C Holder converts its Series C Preferred Stock into common stock, it will receive approximately 25% more shares than it would have received upon conversion prior to the execution of the Waiver Agreement and the adjustment of the conversion price. Under the Waiver Agreement, conversions of Series C Preferred Stock may occur after the March 1, 2019 maturity date.

Additionally, the Series C Holder acknowledged in the Waiver Agreement that no anti-dilution or other adjustments under the Series C Certificate of Designations will result from the exchange of the Warrant (as defined below) for shares of, or the issuance of shares of, our common stock pursuant to the Exchange Agreement (as defined below). We further agreed to reserve specific numbers of shares for issuance to the Series C Holder and the Series D Holders (as defined below), with such reservations to remain in place until we have increased our authorized shares of common stock or effected a reverse stock split.

#### Exchange Agreement

On February 21, 2019, we also entered into an Exchange Agreement (the “Exchange Agreement”) with the holder (the “Warrant Holder”) of our Series A Warrant to Purchase Common Stock, issued on July 12, 2016 (the “Warrant”), which was exercisable for 7,680,000 shares of our common stock. Pursuant to the Exchange Agreement, we have agreed to issue to the Warrant Holder 6,000,000 shares of our common stock (subject to adjustment for stock dividends, stock splits, stock combinations, and other reclassifications) in exchange for the transfer of the Warrant back to the Company, in reliance on an exemption from registration provided by Section 3(a)(9) of the Securities Act of 1933, as amended. Following the transfer of the Warrant back to the Company, the Warrant shall be cancelled and no further shares shall be issuable pursuant to the Warrant.

#### Consent and Waiver

On February 21, 2019, we entered into a Consent and Waiver with each of the holders of our Series D Convertible Preferred Stock (such holders, the “Series D Holders” and such stock, the “Series D Preferred Stock”), pursuant to which the Series D Holders consented to the adjustments to the conversion price of the Series C Preferred Stock set forth in the Waiver Agreement and waived certain anti-dilution rights and conversion price adjustments under the Certificate of Designations, Preferences and Rights of the Series D Preferred Stock (the “Series D Certificate of Designation”) that may have resulted from the conversion price adjustments set forth in the Waiver Agreement. The Series D Holders further acknowledged that no anti-dilution or other adjustments under the Series D Certificate of Designation will result from the exchange of the Warrant for shares of, or the issuance of shares of, our common stock pursuant to the Exchange Agreement.

Additionally, the parties agreed to implement new “pre-notice” procedures in connection with the notices to be given to the Series D Holders of subsequent placements (and their participation rights therein) under the Series D Certificate of Designation, and we agreed to reserve specific numbers of shares for issuance to the Series D Holders, with such reservations to remain in place until we have increased our authorized shares of common stock or effected a reverse stock split.

### RESULTS OF OPERATIONS

Management evaluates the results of operations and cash flows using a variety of key performance indicators, including revenues compared to prior periods and internal forecasts, costs of our products and results of our cost reduction initiatives, and operating cash use. These are discussed throughout the “Results of Operations” and “Liquidity and Capital Resources” sections. Results of Operations are presented in accordance with accounting principles generally accepted in the United States (“GAAP”).

### Comparison of Three Months Ended January 31, 2019 and 2018

### Revenues and Costs of revenues

Our revenues and cost of revenues for the three months ended January 31, 2019 and 2018 were as follows:

*(dollars in thousands)*

|  | Three Months Ended January 31, 2019 | 2018 | Change $% |  |
| --- | ---: | ---: | ---: | ---: |
| Total revenues | $17,783 | $38,613 | $(20,830) | (54)% |
| Total costs of revenues | $19,988 | $33,978 | $(13,990) | (41)% |
| Gross (loss) profit | $(2,205) | $4,635 | $(6,840) | (148)% |
| Gross (loss) margin | (12.4)% | 12.0% |  |  |

Total revenues for the three months ended January 31, 2019 of $17.8 million reflects a decrease of $21.8 million from $38.6 million for the same period in the prior year. Total cost of revenues for the three months ended January 31, 2019 decreased by $14.0 million to $20.0 million from $34.0 million during the same period in the prior year. A discussion of the changes in product revenues, service and license revenues, generation revenues and Advanced Technologies contract revenues follows.

### Product revenues

Our product revenues, cost of product revenues and gross loss for the three months ended January 31, 2019 and 2018 were as follows:

*(dollars in thousands)*

|  | Three Months Ended January 31, 2019 | 2018 | Change $% |  |
| --- | ---: | ---: | ---: | ---: |
| Product revenues | $— | $29,530 | $(29,530) | (100)% |
| Cost of product revenues | 3,422 | 26,137 | (22,715) | (87)% |
| Gross (loss) profit from product revenues | $(3,422) | $3,393 | $(6,815) | (201)% |
| Product revenues gross margin | N/A | 11.5% |  |  |

Product revenues for the three months ended January 31, 2018 included $28.7 million of power plant revenue and $0.8 million of revenue related to engineering and construction services. There was no product revenue recorded for the three months ended January 31, 2019. Product revenue for the three months ended January 31, 2018 included sales to Hanyang Industrial Development Co., Ltd (“HYD”) for a 20 megawatt (“MW”) order pursuant to which we provided equipment to HYD for a fuel cell project with Korea Southern Power Co., Ltd. (“KOSPO”).

Cost of product revenues decreased $22.7 million for the three months ended January 31, 2019 to $3.4 million, compared to $26.1 million in the same period in the prior year. Overall gross loss from product revenues was $3.4 million for the three months ended January 31, 2019 compared to gross profit of $3.4 million in the comparable prior year period. Both periods were impacted by the under-absorption of fixed overhead costs due to low production volumes. Manufacturing variances, primarily related to low production volumes, totaled approximately $3.2 million for the three months ended January 31, 2019 compared to approximately $2.3 million for the three months ended January 31, 2018. For the three months ended January 31, 2019, we operated at an annualized production rate of approximately 33 MW. This is compared to the annual production rate of 25 MW in the same period in the prior year.

As of January 31, 2019, product sales backlog totaled approximately $1.0 thousand compared to $2.2 million as of January 31, 2018.

### Service and license revenues

Service and license revenues and related costs for the three months ended January 31, 2019 and 2018 were as follows:

*(dollars in thousands)*

|  | Three Months Ended January 31, 2019 | 2018 | Change $% |  |
| --- | ---: | ---: | ---: | ---: |
| Service and license revenues | $11,772 | $4,104 | $7,668 | 187% |
| Cost of service and license revenues | 12,319 | 3,406 | 8,913 | 262% |
| Gross (loss) profit from service and license revenues | $(547) | $698 | $(1,245) | (178)% |
| Service and license revenues gross (loss) margin | (4.6)% | 17.0% |  |  |

Revenues for the three months ended January 31, 2019 from service agreements and license fee and royalty agreements increased $7.7 million to $11.8 million from $4.1 million for the three months ended January 31, 2018. Service agreement revenue increased from the three months ended January 31, 2018 primarily due to higher revenue from module replacements during the three months ended January 31, 2019 compared to the same period in the prior year. We adopted Accounting Standards Update (ASU) 2014-09, “Revenue from Contracts with Customers” (Topic 606) as of November 1, 2018 which impacted service and license revenues recognition. Service revenues are now recorded based on completion cost-to-cost input method where as previously service revenues for maintenance and monitoring were recorded ratably over the term of the service agreement and revenue from module exchanges was recognized upon the module replacement event. Performance guarantees, which were previously recorded as a cost of service and license revenues, are now accounted for as variable consideration and therefore as a reduction to service and license revenues. License revenues were previously recorded over the contract term on a straight-line basis and royalty revenue was recorded as earned, however, upon adoption of Topic 606, we assessed the performance obligations within the license contract and allocated consideration between performance obligations that are satisfied at a point in time and performance obligations that are recognized over time. Revenue from the license performance obligation that is satisfied over time, royalty and material management fees was $0.7 million for the three-month period ended January 31, 2019 compared to $0.6 million for the three-month period ended January 31, 2018.

Cost of service and license revenues increased $8.9 million to $12.3 million for the three months ended January 31, 2019 from $3.4 million for the three months ended January 31, 2018. Cost of service agreements includes maintenance and operating costs and module exchanges. As further discussed above, cost of service agreements for the prior year period included charges for performance guarantees.

Overall gross loss from service and license revenues was $0.5 million for the three months ended January 31, 2019. The adoption of Topic 606 resulted in a reduction of service and license margins of $1.3 million resulting primarily from the requirement to incorporate future estimated variable consideration for performance guarantees prior to being incurred from actual plant performance. The overall gross margin loss percentage was 4.6 percent for the three months ended January 31, 2019 compared to a gross margin of 17.0 percent in the prior year period.

As of January 31, 2019, service and license backlog totaled approximately $291.2 million compared to $178.7 million as of January 31, 2018. Service and license backlog does not include future royalties. This backlog is for service agreements of up to twenty years and is expected to generate positive margins and cash flows based on current estimates.

### Generation revenues

Generation revenues and related costs for the three months ended January 31, 2019 and 2018 were as follows:

*(dollars in thousands)*

|  | Three Months Ended January 31, 2019 | 2018 | Change $% |  |
| --- | ---: | ---: | ---: | ---: |
| Generation revenues | $1,479 | $1,892 | $(413) | (22)% |
| Cost of generation revenues | 1,636 | 1,609 | 27 | 2% |
| Gross (loss) profit from generation revenues | $(157) | $283 | $(440) | (155)% |
| Generation revenues gross (loss) margin | (10.6)% | 15.0% |  |  |

Revenues for the three months ended January 31, 2019 from generation totaled $1.5 million which decreased $0.4 million from revenue recognized of $1.9 million for the three months ended January 31, 2018. Generation revenues for the three months ended January 31, 2019 and 2018 reflect revenue from electricity generated under our PPAs. Revenues declined for the three months ended January 31, 2018 compared to the prior year period due to maintenance activities causing a decrease in power output. Cost of generation revenues totaled $1.6 million in the three months ended January 31, 2019 which remained unchanged from the comparable prior year period. Cost of generation revenues included depreciation of approximately $1.0 million for the three months ended January 31, 2019 and January 31, 2018. We had 11.2 MW of operating power plants in our portfolio for both periods presented.

As of January 31, 2019, generation backlog totaled approximately $982.4 million compared to $414.5 million as of January 31, 2018.

### Advanced Technologies contract revenues

Advanced Technologies contract revenues and related costs for the three months ended January 31, 2019 and 2018 were as follows:

*(dollars in thousands)*

|  | Three Months Ended January 31, 2019 | 2018 | Change $% |  |
| --- | ---: | ---: | ---: | ---: |
| Advanced Technologies contract revenues | $4,532 | $3,087 | $1,445 | 47% |
| Cost of Advanced Technologies contract revenues | 2,611 | 2,826 | (215) | (8)% |
| Gross profit from Advanced Technologies contracts | $1,921 | $261 | $1,660 | 636% |
| Advanced Technologies contract gross margin | 42.4% | 8.5% |  |  |

Advanced Technologies contract revenue for the three months ended January 31, 2019 was $4.5 million, which reflects an increase of $1.4 million when compared to $3.1 million of revenue for the three months ended January 31, 2018. Advanced Technologies contract revenue was higher for the three months ended January 31, 2019 primarily due to the timing of activity under existing contracts. Cost of Advanced Technologies contract revenues decreased $0.2 million to $2.6 million for the three months ended January 31, 2019, compared to $2.8 million for the same period in the prior year. Advanced Technologies contracts for the three months ended January 31, 2019 generated a gross profit of $1.9 million compared to a gross profit of $0.3 million for the three months ended January 31, 2018. The increase in Advanced Technologies contract gross margin is related to the timing and mix of contracts being performed during the three months ended January 31, 2019.

As of January 31, 2019, Advanced Technologies backlog totaled approximately $37.0 million compared to $43.0 million as of January 31, 2018.

### Administrative and selling expenses

Administrative and selling expenses were $6.8 million and $6.1 million for the three months ended January 31, 2019 and 2018, respectively. The increase from the prior year period relates to the timing of professional related expenditures and sales and marketing costs due to business activities in the three months ended January 31, 2019.

### Research and development expenses

Research and development expenses increased to $6.3 million for the three months ended January 31, 2019 compared to $4.0 million during the three months ended January 31, 2018. The increase related to increased development efforts with respect to new products which includes the development and certifications related to the SureSource 4000 plant located in Danbury, CT.

### Loss from operations

Loss from operations for the three months ended January 31, 2019 was $15.2 million compared to $5.6 million for the three months ended January 31, 2018. The increase in the loss from operations was primarily a result of the gross loss recognized and higher operating expenses for the three months ended January 31, 2019.

### Interest expense

Interest expense for the three months ended January 31, 2019 and 2018 was $2.5 million and $2.1 million, respectively. Interest expense for both periods presented includes interest on the loan and security agreement with Hercules Capital, Inc. (“Hercules”), interest expense related to sale-leaseback transactions and interest for the amortization of the redeemable preferred stock of subsidiary fair value discount.

### Other income, net

Other income, net, was income of $0.2 million and $0.5 million for the three months ended January 31, 2019 and 2018, respectively. The income for both periods presented includes foreign exchange gains related to the remeasurement of the Canadian Dollar denominated preferred stock obligation of our U.S. Dollar functional currency Canadian subsidiary.

### Benefit for income taxes, net

We have not paid federal or state income taxes in several years due to our history of net operating losses, although we have paid foreign income and withholding taxes in South Korea. There was no income tax expense recorded for the three months ended January 31, 2019 compared to an income tax benefit totaling $3.0 million recorded for the three months ended January 31, 2018. The income tax benefit for the three months ended January 31, 2018 related to the Tax Cuts and Jobs Act (the “Act”) that was enacted on December 22, 2017. The Act reduced the U.S. federal corporate tax rate from 34% to 21% effective January 1, 2018, which resulted in a deferred tax benefit of $1.0 million related to a reduction of our deferred tax liability for in process research and development (“IPR&D”). The Act also established an unlimited carryforward period for the net operating loss (“NOL”) we generated in fiscal year 2018. This provision of the Act resulted in a reduction of the valuation allowance attributable to deferred tax assets at the enactment date by $2.0 million based on the indefinite life of the resulting NOL as well as the deferred tax liability for IPR&D.

### Series B preferred stock dividends

Dividends recorded on our 5% Series B Cumulative Convertible Perpetual Preferred Stock (“Series B Preferred Stock”) were $0.8 million for the three month periods ended January 31, 2019 and 2018.

### Series C preferred stock deemed dividends and redemption value adjustment

Installment conversions occurring prior to August 27, 2018 in which the conversion price was below the initial conversion price of $1.84 per share, installment conversions occurring between August 27, 2018 and December 2, 2018 in which the conversion price was below the adjusted conversion price of $1.50 per share and installment conversions occurring between January 2, 2019 and January 31, 2019 in which the conversion price was below the further adjusted conversion price of $0.43, resulted in a variable number of shares being issued to settle the installment amount and were treated as a partial redemption of the Series C Preferred Shares. Installment conversions during the three months ended January 31, 2019 and 2018 that were settled in a variable number of shares and treated as partial redemptions resulted in deemed dividends of $0.5 million and $3.5 million, respectively. The deemed dividends represent the difference between the fair value of the common shares issued to settle the installment amounts and the carrying value of the Series C Preferred Shares.

The decline in our stock price during the three months ended January 31, 2019 resulted in equity conditions failures under the Series C Certificate of Designations, which were subsequently (after quarter end) waived by the holder of the Series C Preferred Stock in that certain Waiver Agreement, dated February 21, 2019, between the Company and the holder of Series C Preferred Stock (see Note 17, “Subsequent Events” for additional information). Prior to the execution of such Waiver Agreement, the conversion price was adjusted in December 2018 and January 2019, such that the conversion price in effect as of January 31, 2019 was $0.43. This beneficial conversion feature resulted in a $6.6 million reduction in the Series C Preferred Shares carrying value. Because the equity conditions failures were continuing as of January 31, 2019 (prior to the execution of the Waiver Agreement), the Series C Preferred Shares were adjusted to 108% of stated redemption value as of January 31, 2019 with a corresponding charge to common shareholders of $8.6 million.

Under the Waiver Agreement (executed after quarter end), we were deemed to have reduced the conversion price of the Series C Preferred Shares converted between the time of the equity conditions failures and the date of the Waiver Agreement as necessary to cause the number of shares of common stock delivered upon such conversions to equal the number of shares issuable upon conversion at such times.

### Series D preferred stock deemed dividends and redemption accretion

Installment conversions where the conversion price is below the conversion price of $1.38 per share (the conversion price of the Series D Preferred Stock as of January 31, 2019) result in a variable number of shares being issued to settle the installment amount and are treated as a partial redemption of the Series D Preferred Shares. Installment conversions during the three months ended January 31, 2019 that were settled in a variable number of shares and treated as redemptions resulted in deemed dividends of $1.9 million. The deemed dividends represent the difference between the fair value of the common shares issued to settle the installment amounts and the carrying value of the Series D Preferred Shares.

The Series D Preferred Stock redemption accretion of $3.8 million for the three months ended January 31, 2019 reflects the accretion of the difference between the carrying value and the amount that would be redeemed should stockholder approval not be obtained for common stock issuance equal to 20% or more of our outstanding voting stock prior to the issuance of the Series D Preferred Stock. In the event that we are unable to obtain such stockholder approval and are therefore prohibited from issuing shares of common stock as a result of this limitation (the “Exchange Cap Shares”) to a holder of Series D Preferred Stock at any time after April 30, 2019, we shall pay cash to such holder in exchange for the redemption of such number of Series D Preferred Shares held by such holder that are not convertible into such Exchange Cap Shares at a price equal to the product of (i) such number of Exchange Cap Shares and (ii) the closing sale price on the trading day immediately preceding the date such holder delivers the applicable conversion notice with respect to such Exchange Cap Shares to us.

### Net loss attributable to common stockholders and loss per common share

Net loss attributable to common stockholders represents the net loss for the period less the preferred stock dividends on the Series B Preferred Stock, the preferred stock deemed dividends and redemption value adjustment on the Series C Preferred Stock and the Series D preferred stock deemed dividends and redemption accretion. For the three month periods ended January 31, 2019 and 2018, net loss attributable to common stockholders was $33.0 million and $8.4 million, respectively, and loss per common share was $0.33 and $0.12, respectively.

### LIQUIDITY AND CAPITAL RESOURCES

As of January 31, 2019, we believe that our cash, cash equivalents on hand, cash flows from operating activities, availability under our loan facilities and access to debt and capital markets will be sufficient to meet our working capital and capital expenditure needs for at least the next twelve months.

We expect to maintain appropriate cash and debt levels based upon our expected cash requirements for operations, capital expenditures, construction of project assets and principal, interest and dividend payments. In the future, we may also engage in additional debt or equity financings, including project specific debt financings under existing and new facilities. We believe that, when necessary, we will have adequate access to the capital markets, although the timing, size and terms of any financing will depend on multiple factors, including market conditions, future order flow and the need to adjust production capacity. There can be no assurance that we will be able to raise additional capital at the times, in the amounts, or on the terms required for the implementation of our business plan and strategy. In addition, our capital-intensive business model of building generation assets increases the risk that we will be unable to successfully implement our plans, particularly if we do not raise additional capital in the amounts required. If we are unable to raise additional capital at the times or in the amounts required, or on terms favorable to us, our growth potential may be adversely affected and we may have to modify our plans which could include restructuring, workforce reductions, change in production volumes and asset or intellectual property sales. If these strategies are not successful, we may be required to delay, reduce and/or cease our operations.

Cash and cash equivalents including restricted cash totaled $68.2 million as of January 31, 2019 compared to $80.2 million as of October 31, 2018. As of January 31, 2019:

- Unrestricted cash and cash equivalents was $27.8 million compared to $39.3 million as of October 31, 2018.
- Restricted cash and cash equivalents was $40.5 million, of which $5.6 million was classified as current and $34.9 million was classified as non-current, compared to $40.9 million of total restricted cash and cash equivalents as of October 31, 2018, of which $5.8 million was classified as current and $35.1 million was classified as non-current.

In addition to the cash and cash equivalents described above, we have $90.0 million of availability under our project finance loan agreement with Generate Lending, LLC. (“Lender” or “Generate Lending”).

On December 21, 2018, we, through our indirect wholly-owned subsidiary FuelCell Energy Finance II, LLC (“FCEF II” or “Borrower”), entered into a Construction Loan Agreement (the “Agreement” or the “Generate Lending Construction Loan Agreement”) with Generate Lending pursuant to which Generate Lending agreed (the “Commitment”) to make available to FCEF II a credit facility in an aggregate principal amount of up to $100.0 million and, subject to further Lender approval and available capital, up to $300.0 million upon our request (the “Facility”) to fund the manufacture, construction, installation, commissioning and start-up of stationary fuel cell projects to be developed by us on behalf of Borrower during the Availability Period (as defined below and in the Agreement). Fuel cell projects must meet certain conditions to be determined to be “Approved Projects” under the Facility. The Facility will be comprised of multiple loans to individual Approved Projects (each, a “Working Capital Loan”). Each Working Capital Loan will be sized to the lesser of (i) 100% of the construction budget and (ii) the invested amount that allows Lender to achieve a 10% unlevered, after-tax inefficient internal rate of return. Approved Projects will be funded on a cost incurred basis. We or FCEF II will contribute any additional equity required to construct an Approved Project on a pari-passu basis with the Working Capital Loans. The Commitment to provide Working Capital Loans will remain in place for thirty-six months from the date of the Agreement (the “Availability Period”). Working Capital Loans borrowed during the Availability Period for Approved Projects may be outstanding until the achievement of an Approved Project’s commercial operation date, to the extent that such date is after the Availability Period. Interest will accrue at 9.5% per annum, calculated on a 30/360 basis, on all outstanding principal, paid on the first business day of each month.

The initial draw amount under the Facility, funded at closing, was $10.0 million. The initial draw reflects loan advances for the first Approved Project under the Facility, the Bolthouse Farms 5 MW project in California. Additional drawdowns are expected to take place as we complete certain project milestones. We expect to use this Facility to fund the construction of our utility-scale backlog, including the three projects totaling 39.8 MW with LIPA (as defined below) and the two projects awarded pursuant to the Connecticut DEEP RFP, totaling 22.2 MW.

In addition, on February 28, 2019, we, through our indirect wholly-owned subsidiary Groton Station Fuel Cell, LLC (“Groton Borrower”), entered into a Construction Loan Agreement (the “Construction Loan Agreement”) with Fifth Third Bank (“Fifth Third”) pursuant to which Fifth Third agreed to make available to Groton Borrower a construction loan facility in an aggregate principal amount of up to $23.0 million (the “Groton Facility”) to fund the manufacture, construction, installation, commissioning and start-up of the 7.4 megawatt fuel cell power plant for the Connecticut Municipal Electric Energy Cooperative located on the U.S. Navy submarine base in Groton, Connecticut (the “Groton Project”). Groton Borrower made an initial draw under the Groton Facility on the date of closing of $9.6 million. Amounts borrowed under the Groton Facility bear interest at a rate equal to the sum of the one-month LIBOR Rate plus 2.25 %. Regular monthly payments are interest-only. Amounts borrowed under the Groton Facility may be prepaid at any time without penalty. The maturity date of the Groton Facility will be the earlier of (a) October 31, 2019, (b) the commercial operation date of the Groton Project, or (c) one business day after receipt of proceeds of debt financing (i.e., take out financing) in an amount sufficient to repay the outstanding indebtedness under the Groton Facility. Mandatory prepayments are required in the event of material damage or destruction to the Groton Project or a change of control of Groton Borrower.

As of and subsequent to January 26, 2019, Dominion Energy has the ability to terminate the membership interest purchase agreement without penalty, although we continue to work with the Connecticut Green Bank to source financing for the potential acquisition of the 14.9 MW Bridgeport fuel cell park. If we are able to secure financing and Dominion Energy agrees to sell the Bridgeport fuel cell park, the Bridgeport project would be incremental to our Generation portfolio. We are working to utilize term debt financing and would fund the balance of the $36.6 million purchase with $15 million of restricted cash on hand that is tied to the project and would be released at closing.

In June 2018, we entered into an At Market Issuance Sales Agreement (the “Sales Agreement”) with B. Riley FBR, Inc. and Oppenheimer & Co. Inc. (together, the “Agents”) to create an at the market equity program under which we, from time to time, may offer and sell shares of our common stock having an aggregate offering price of up to $50.0 million through the Agents. Under the Sales Agreement, the Agent making the sales is entitled to a commission in an amount equal to 3.0% of the gross proceeds from such sales. Since entering into the Sales Agreement, we sold 5.7 million shares of our common stock at prevailing market prices under the Sales Agreement and received gross proceeds of $8.0 million and paid $0.9 million of fees and commissions. We expect to use this sales agreement from time to time to raise proceeds for general corporate purposes.

In addition to the debt facilities and Sales Agreement described above, we have an effective shelf registration statement on file with the SEC for issuance of equity and debt securities.

Our future liquidity will be dependent on obtaining a combination of increased order and contract volumes, increased cash flows from our generation and service portfolios and cost reductions necessary to achieve profitable operations. To grow our generation portfolio, we will invest in developing and building turn-key fuel cell projects which we will own and classify as project assets on the balance sheet. This strategy requires liquidity and is expected to continue to have increasing liquidity requirements as project sizes increase. We may commence building project assets upon the award of a project or execution of a multi-year PPA with an end-user that has a strong credit profile. Project development and construction cycles, which span the time between securing a PPA and commercial operation of the plant, vary substantially and can take years. As a result of these project cycles and strategic decisions to finance the construction of certain projects, we may need to make significant up-front investments of resources in advance of the receipt of any cash from the sale or long-term financing of such projects. These up-front investments may include using our working capital, availability under our construction financing facilities or other financing arrangements. Delays in construction progress or in completing financing or the sale of our projects may impact our liquidity.

Our operating portfolio (11.2 MW as of January 31, 2019) contributes higher long-term cash flows to us than if these projects had been sold. These projects currently generate $7 - $8 million per year in annual revenue. We plan to continue to grow this portfolio while also selling projects to investors. As of January 31, 2019, we had an additional 50.7 MW under development and construction, which projects are expected to generate operating cash flows in future periods. These totals do not include the 32.4 MW Long Island Power Authority (“LIPA”) project awards, which are not yet in backlog. Including the LIPA awards, the projects in process totaled 83.1 MW as of January 31, 2019. We expect these projects, which include the LIPA awards, to generate an additional $70 - $80 million of annual recurring revenue once they become operational. Retaining long-term cash flow positive projects combined with our service fleet reduces reliance on new project sales to achieve cash flow positive operations. We have worked with financial institutions to secure long-term debt and sale-leasebacks for our project asset portfolio as well as Generate Lending, Fifth Third Bank and NRG for construction period financing. As of January 31, 2019, we have financed four projects through sale-leaseback transactions. As of January 31, 2019, total financing obligations and debt outstanding related to project assets was $63.9 million. Future required payments under these obligations total $38.3 million as of January 31, 2019. The outstanding financing obligation under the sale-leaseback transactions includes an embedded gain which will be recognized at the end of the lease term.

Our operating portfolio provides us with the full benefit of future cash flows, net of any debt service requirements.

The following table summarizes our operating portfolio as of January 31, 2019:

| Project Name | Location | Power Off-Taker | Rated Capacity (MW) | Actual Commercial Operation Date (FuelCell Energy Fiscal Quarter) | PPA Term (Years) |
| --- | --- | --- | ---: | --- | ---: |
| Central CT State University (“CCSU”) | New Britain, CT | CCSU (CT University) | 1.4 | Q2 ‘12 | 10 |
| UCI Medical Center (“UCI”) | Orange, CA | UCI (CA University Hospital) | 1.4 | Q1 '16 | 19 |
| Riverside Regional Water Quality Control Plant | Riverside, CA | City of Riverside (CA Municipality) | 1.4 | Q4 '16 | 20 |
| Pfizer, Inc. | Groton, CT | Pfizer, Inc. | 5.6 | Q4 '16 | 20 |
| Santa Rita Jail | Dublin, CA | Alameda County, California | 1.4 | Q1 '17 | 20 |
|  |  | **Total MW Operating:** | **11.2** |  |  |

The following table summarizes projects in process as of January 31, 2019:

| Project Name | Location | Power Off-Taker | Rated Capacity (MW) | Estimated Commercial Operation Date (FuelCell Energy Fiscal Quarter) | PPA Term (Years) |
| --- | --- | --- | ---: | --- | ---: |
| Triangle St | Danbury, CT | Eversource (CT Utility) | 3.7 | Q2 '19 | Tariff |
| Tulare BioMAT | Tulare, CA | Southern California Edison (CA Utility) | 2.8 | Q3 '19 | 20 |
| Bolthouse Farms | Bakersfield, CA | Bolthouse Farms (Campbell's) | 5.0 | Q4 '19 | 20 |
| Groton Sub Base | Groton, CT | CMEEC (CT Electric Co-op) | 7.4 | Q2 '20 | 20 |
| Toyota | Los Angeles, CA | Southern California Edison; Toyota | 2.2 | Q4 '21 | 20 |
| LIPA 1 | Long Island, NY | PSEG / LIPA, LI NY (Utility) | 7.4 | Q2 '20 | 20 |
| LIPA 2 | Long Island, NY | PSEG / LIPA, LI NY (Utility) | 18.5 | Q3 '21 | 20 |
| LIPA 3 | Long Island, NY | PSEG / LIPA, LI NY (Utility) | 13.9 | Q3 '22 | 20 |
| CT RFP-1 | Hartford, CT | Eversource (CT Utility) | 7.4 | Q4 '21 | 20 |
| CT RFP-2 | Derby, CT | United Illuminating (CT Utility) | 14.8 | Q4 '20 | 20 |
|  |  | **Total MW in Process:** | **83.1** |  |  |

We had a contract backlog totaling approximately $1.3 billion as of January 31, 2019. We also had project awards with respect to 32.4 MW of LIPA projects totaling an additional $636.3 million, resulting in total backlog and awards of approximately $1.9 billion as of January 31, 2019. The LIPA project PPAs are expected to be executed in the first half of fiscal year 2019.

Backlog by revenue category is as follows:

- Services and license backlog totaled $291.2 million as of January 31, 2019 compared to $178.7 million as of January 31, 2018. Services backlog includes future contracted revenue from routine maintenance and scheduled module exchanges for power plants under service agreements.
- Generation backlog totaled $982.4 million as of January 31, 2019 compared to $414.5 million as of January 31, 2018. Generation backlog represents future contracted energy sales under contracted PPAs between us and the end-user of the power.
- Product sales backlog totaled $0.1 thousand as of January 31, 2019 compared to $2.2 million as of January 31, 2018.
- Advanced Technologies contract backlog totaled $37.0 million as of January 31, 2019 compared to $43.1 million as of January 31, 2018.

Backlog represents definitive agreements executed by us and our customers. Projects with respect to which we intend to retain ownership are included in generation backlog, which represents future revenue under long-term PPAs. Projects sold to customers (and not retained by us) are included in product sales and service backlog. Project awards referenced by us are notifications that we have been selected, typically through a competitive bidding process, to enter into definitive agreements. These awards have been publicly disclosed. We are working to enter into definitive agreements with respect to these project awards and, upon execution of a definitive agreement with respect to a project award, that project award will become backlog. Project awards that were not included in backlog as of January 31, 2019 include the 32.4 MW LIPA project awards (which are expected to become generation backlog). These awards in total represent approximately $636.3 million of future revenue potential over the life of the projects, assuming we retain ownership of the projects. If we were to sell such projects, the backlog amount would be decreased (in an amount determined by the negotiated sales price at the time of sale) and would consist of product sales to be recognized over a one to two-year period and service revenue to be recognized over a twenty-year term.

Factors that may impact our liquidity in fiscal year 2019 and beyond include:

- Timing of project awards and factory production rate. We bid on large projects in diverse markets that can have long decision cycles and uncertain outcomes. We manage production rate based on expected demand and projects schedules. Changes to production rate take time to implement. In fiscal 2018, we began to increase our production rate from a level of 25 MW and as of January 31, 2019 the production run-rate was approximately 35 MW on an annualized basis.
- As project sizes evolve, project cycle times may increase. We may need to make significant up-front investments of resources in advance of the receipt of any cash from the sale of our projects. These amounts include development costs, interconnection costs, posting of letters of credit, bonding or other forms of security, and incurring engineering, permitting, legal, and other expenses.
- The amount of accounts receivable and unbilled receivables as of January 31, 2019 and October 31, 2018 was $38.1 million ($17.4 million of which is classified as “Other assets”) and $32.4 million ($9.4 million of which is classified as “Other assets”), respectively. Unbilled accounts receivable represents revenue that has been recognized in advance of billing the customer under the terms of the underlying contracts. Such costs have been funded with working capital and the unbilled amounts are expected to be billed and collected from customers once we meet the billing criteria under the contracts. Our accounts receivable balances may fluctuate as of any balance sheet date depending on the timing of individual contract milestones and progress on completion of our projects.
- The amount of total inventory as of January 31, 2019 and October 31, 2018 was $54.8 million and $53.6 million, respectively, which includes work in process inventory totaling $26.8 million and $29.1 million, respectively. Work in process inventory can generally be deployed rapidly while the balance of our inventory requires further manufacturing prior to deployment. As we continue to execute on our business plan, we must produce fuel cell modules and procure balance of plant (“BOP”) components in required volumes to support our planned construction schedules and potential customer contractual requirements. As a result, we may manufacture modules or acquire BOP in advance of receiving payment for such activities. This may result in fluctuations of inventory and use of cash as of any balance sheet date.
- The amount of total project assets as of January 31, 2019 and October 31, 2018 was $109.8 million and $99.6 million, respectively. Project assets consist of capitalized costs for fuel cell projects that are either operating and producing revenue or under construction. Project assets as of January 31, 2019 consisted of $27.2 million of completed installations currently operating and $82.6 million of projects in development. As of January 31, 2019, we had 11.2 MW of our operating project assets, which generated $7.2 million of revenue in fiscal 2018. Also, as of January 31, 2019, we had an additional 83.1 MW under development and construction, some of which is expected to generate operating cash flows in fiscal year 2019. We expect this portfolio to continue to grow.
- Under the terms of certain contracts, we will provide performance security for future contractual obligations. As of January 31, 2019, we had pledged approximately $40.5 million of our cash and cash equivalents as collateral for performance security and for letters of credit for certain banking requirements and contracts. This balance may increase with a growing backlog and installed fleet.
- For fiscal year 2019, we forecast capital expenditures in the range of $2.0 to $4.0 million compared to $10.0 million in fiscal year 2018. Over the past two years, we completed the expansion of our 65,000 square foot manufacturing facility in Torrington, Connecticut by adding approximately 102,000 square feet for a total size of 167,000 square feet. Initially, this additional space will be used to enhance and streamline logistics functions through consolidation of satellite warehouse locations and will provide the space needed to reconfigure the existing production process to improve manufacturing

efficiencies and realize cost savings. Investments in 2019 are expected to include finalizing the addition of module conditioning capacity to our Torrington facility. Commissioning is expected to be completed in the first quarter of calendar year 2019, leading to anticipated logistics, time and cost savings as modules are currently shipped to our Danbury, Connecticut facility for conditioning.

### Cash Flows

Cash and cash equivalents and restricted cash and cash equivalents totaled $68.2 million as of January 31, 2019 compared to $80.2 million as of October 31, 2018. As of January 31, 2019, restricted cash and cash equivalents was $40.5 million, of which $5.6 million was classified as current and $34.9 million was classified as non-current, compared to $40.9 million total restricted cash and cash equivalents as of October 31, 2018, of which $5.8 million was classified as current and $35.1 million was classified as non-current.

The following table summarizes our consolidated cash flows:

*(dollars in thousands)*

| Consolidated Cash Flow Data: | Three Months Ended January 31, 2019 | 2018 |
| --- | ---: | ---: |
| Net cash (used in) provided by operating activities | $(11,958) | $39,997 |
| Net cash used in investing activities | (14,224) | (7,393) |
| Net cash provided by (used in) financing activities | 14,150 | (4,654) |
| Effects on cash from changes in foreign currency rates | 7 | 33 |
| Net (decrease) increase in cash, cash equivalents and restricted cash | $(12,025) | $27,983 |

The key components of our cash inflows and outflows were as follows:

***Operating Activities –*** Net cash used in operating activities was $12.0 million during the three months ended January 31, 2019, compared to $40.0 million of net cash provided by operating activities during the three months ended January 31, 2018.

Net cash used in operating activities for the three months ended January 31, 2019 was primarily the result of the net loss of $17.5 million and decreases of $1.3 million in accounts receivable and increases in unbilled receivables of $7.8 million, deferred revenue of $5.8 million and accrued liabilities of $2.5 million and net non-cash adjustments of $5.0 million.

Net cash provided by operating activities for the three months ended January 31, 2018 was primarily the result of decreases in accounts receivable of $26.3 million and inventory of $14.8 million, increases in accrued liabilities of $3.1 million and deferred revenue of $1.9 million and non-cash adjustments of $1.8 million. Accounts receivable and inventory decreased primarily as a result of cash received and inventory delivered under the HYD contract. The amounts were offset by the net loss of $4.2 million for the three months ended January 31, 2018 and a decrease in accounts payable.

***Investing Activities –*** Net cash used in investing activities was $14.2 million for the three months ended January 31, 2019, compared to net cash used in investing activities of $7.4 million during the three months ended January 31, 2018.

Net cash used in investing activities for the three months ended January 31, 2019 included a $12.6 million investment in project assets to expand our operating portfolio and $1.6 million for capital expenditures.

The net cash used in investing activities for the three months ended January 31, 2018 included a $4.6 million investment in project assets to expand our operating portfolio and $2.8 million for capital expenditures.

***Financing Activities –*** Net cash provided by financing activities was $14.2 million during the three months ended January 31, 2019, compared to net cash used in financing activities of $4.7 million during the three months ended January 31, 2018.

Net cash provided by financing activities during the three months ended January 31, 2019 resulted from the receipt of $17.3 million of debt proceeds which included $10.0 million from the Generate Lending Working Capital Loan, $5.8 million received from the NRG Loan Agreement and $1.5 million received from the Enhanced Capital Loan Agreement offset by the debt repayment of $1.6 million and the payment of preferred dividends and the return of capital of $1.0 million.

Net cash used in financing activities during the three months ended January 31, 2018 resulted from cash payments of $6.3 million primarily relating to the repayment obligations under the Hercules loan and the payment of preferred dividends and the return of capital of $1.0 million. Cash payments were offset by cash received from warrant exercises of $2.6 million.

### Sources and Uses of Cash and Investments

In order to consistently produce positive cash flow from operations, we need to increase order flow to support higher production levels, leading to lower costs on a per unit basis. We also continue to invest in new product and market development and, as a result, we are not consistently generating positive cash flow from our operations. Our operations are funded primarily through cash generated from product sales, service contracts, generation assets and Advanced Technologies contracts as well as sales of equity and equity linked securities and issuances of corporate and project debt. Please see our Annual Report on Form 10-K for the fiscal year ended October 31, 2018 for further details.

### Commitments and Significant Contractual Obligations

A summary of our significant commitments and contractual obligations as of January 31, 2019 and the related payments by fiscal year are as follows:

*(dollars in thousands)*

|  | Payments Due by Period Total | Less than 1 Year | 1 – 3 Years | 3 – 5 Years | More than 5 Years |
| --- | ---: | ---: | ---: | ---: | ---: |
| Purchase commitments (1) | $54,398 | $52,885 | $1,491 | $22 | $— |
| Series 1 Preferred obligation (2) | 5,049 | 952 | 4,097 | — | — |
| Term loans (principal and interest) | 66,320 | 38,956 | 11,712 | 5,277 | 10,375 |
| Capital and operating lease commitments (3) | 5,638 | 1,018 | 956 | 754 | 2,910 |
| Sale-leaseback financing obligation (4) | 20,127 | 3,705 | 6,364 | 4,504 | 5,554 |
| Option fee(5) | 550 | 250 | 300 | — | — |
| Series B Preferred dividends payable (6) | — | — | — | — | — |
| **Totals** | $152,082 | $97,766 | $24,920 | $10,557 | $18,839 |

(1) Purchase commitments with suppliers for materials, supplies and services incurred in the normal course of business.

(2) The terms of the Class A Cumulative Redeemable Exchangeable Preferred Share Agreement (the “Series 1 Preferred Share Agreement”) require payments of (i) an annual amount of Cdn. $500,000 for dividends and (ii) an annual amount of Cdn. $750,000 as return of capital payments payable in cash. These payments will end on December 31, 2020. Dividends accrue at a 1.25 percent quarterly rate on the unpaid principal balance, and additional dividends will accrue on the cumulative unpaid dividends at a rate of 1.25 percent per quarter, compounded quarterly. On December 31, 2020, the amount of all accrued and unpaid dividends on the Series 1 Preferred Shares of Cdn. $21.1 million and the balance of the principal redemption price of Cdn. $4.4 million will be due to the holders of the Series 1 Preferred Shares. We have the option of making dividend payments in the form of common stock or cash under terms outlined in the Series 1 Preferred Share Agreement. For purposes of preparing the above table, the final balance of accrued and unpaid dividends due December 31, 2020 of Cdn. $21.1 million is assumed to be paid in the form of common stock and not included in this table.

(3) Future minimum lease payments on capital and operating leases.

(4) The amount represents payments due on sale-leaseback transactions of our wholly-owned subsidiaries, under their respective financing agreements with PNC. Lease payments under this facility are generally payable in fixed quarterly installments over a ten-year period.

(5) We entered into an agreement with a customer on June 29, 2016 that includes a fee for the purchase of the plants at the end of the term of the agreement. The fee is payable in installments over the term of the agreement.

(6) We pay $3.2 million in annual dividends on our Series B Preferred Stock. The $3.2 million annual dividend payment has not been included in this table as we cannot reasonably determine when or if we will be able to convert the Series B Preferred Stock into shares of our common stock. We may, at our option, convert these shares into the number of shares of our common stock that are issuable at the then prevailing conversion rate if the closing price of our common stock exceeds 150 percent of the then prevailing conversion price ($141 per share at January 31, 2019) for 20 trading days during any consecutive 30 trading day period.

In November 2016, our wholly-owned subsidiary, FuelCell Finance, entered into a membership interest purchase agreement with GW Power LLC (“GWP”) whereby FuelCell Finance purchased all of the outstanding membership interests in New Britain Renewable Energy, LLC (“NBRE”) from GWP. GWP assigned the NBRE interest to FuelCell Finance free and clear of all liens other than a pledge in favor of Webster Bank, National Association (“Webster Bank”). FuelCell Finance assumed the debt outstanding with Webster Bank in the amount of $2.3 million. The term loan interest rate is 5.0% per annum and payments due on a quarterly basis commenced in January 2017. The balance outstanding as of January 31, 2019 was $1.0 million.

In April 2016, we entered into the Hercules Agreement with Hercules for a loan with an aggregate principal amount of up to $25.0 million, subject to certain terms and conditions. We received an initial term loan advance on the date of closing of $15.0 million and an additional $5.0 million in September 2016. The loan was a 30 month secured facility. The term loan interest rate was previously 9.75% per annum and increased to 10.0% per annum during the three months ended January 31, 2018 as a result of the increase in the prime rate. In addition to interest, which is paid on a monthly basis, principal payments commenced on November 1, 2017 in equal monthly installments. The loan balance and all accrued and unpaid interest was due and payable by October 1, 2018. Under the terms of the Hercules Agreement, there was an end of term charge of $1.7 million also due and paid October 31, 2018.

The Hercules Agreement was amended on September 5, 2017, October 27, 2017, March 28, 2018, August 29, 2018 and December 19, 2018. The March 28, 2018 Amendment (the “March Amendment”) allowed us to draw a term loan advance of $13.1 million. The aggregate amount outstanding, which included the amount outstanding under the original Hercules Agreement of $11.9 million and the term loan advance under the March Amendment, was $25.0 million as of January 31, 2019. The term loan maturity date is April 1, 2020. Payments for the aggregate amount outstanding are interest only for the initial 12-month period, followed by equal monthly installments of principal and interest until the term loan maturity date. The term loan interest rate was 10.15% per annum and increased to 10.40% per annum in June 2018, 10.65% per annum in September 2018, and 10.90% per annum in December 2018 as a result of increases in the prime rate. The term loan interest rate is the greater of either (i) 9.90% plus the prime rate minus 4.50%, and (ii) 9.90%. The initial end of term charge of $1.7 million was paid on October 1, 2018. An additional end of term charge of $0.9 million will be due on April 1, 2020, subject to extension upon our achievement of certain performance milestones. The additional end of term charge is being accreted over a 30-month term.

As collateral for obligations under the Hercules Agreement, as amended, we granted Hercules a security interest in FuelCell Energy, Inc.’s existing and thereafter-acquired assets except for intellectual property and certain other excluded assets. The collateral does not include assets held by FuelCell Finance, FuelCell Energy Finance II or any project subsidiary thereof. We may continue to collateralize and finance our project subsidiaries through other lenders and partners. As of January 31, 2019, the Hercules Agreement, as amended, included a minimum cash covenant requiring us to maintain an unrestricted cash balance in accounts subject to an account control agreement in favor of Hercules of at least the greater of (a) 75% of the outstanding loan balance plus (b) the amount of accounts payable (as defined under GAAP) not paid within 90 days of the date payment was issued. The Hercules Agreement, as amended, contains customary representations and warranties, affirmative and negative covenants, and events of default that entitle Hercules to cause our indebtedness under the agreement to become immediately due and payable.

On August 29, 2018, in connection with the issuance of Series D Preferred Stock, we and Hercules (and various affiliated entities) entered into the fourth amendment to the Hercules Agreement to (i) modify the definition of “Permitted Indebtedness” to include certain redemption and/or conversion rights as set forth in the Series D Certificate of Designation, (ii) permit us, so long as no event of default has occurred and is continuing, to repurchase or redeem stock in cash pursuant to the redemption and/or conversion rights set forth in the Series D Certificate of Designation; provided that, we must make any such repurchase, redemption or payment in common stock and not in cash or other consideration unless prohibited pursuant to the terms of the Series D Certificate of Designation or otherwise prohibited by applicable law, (iii) permit us, so long as no event of default has occurred and is continuing, to pay cash dividends under the Series D Preferred Shares as required in the Series D Certificate of Designation; provided that, we must pay such dividends in common stock and not in cash or other consideration unless prohibited pursuant to the terms of the Series D Certificate of Designation or otherwise prohibited by applicable law, and (iv) add a new event of default, which occurs upon the delivery of a Triggering Event Redemption Notice (as defined under the Series D Certificate of Designation) under the Series D Certificate of Designation.

On December 19, 2018, to facilitate the Generate Lending Construction Loan Agreement described above, we and Hercules (and various affiliated entities) entered into the fifth amendment to the Hercules Agreement to (i) modify the definitions of “Permitted Investment”, “Permitted Liens”, “Project Companies”, “Project Company Indebtedness”, and “Qualified Subsidiary” to permit the creation of a new holding company, FuelCell Energy Finance II, LLC, to hold the membership interests of project companies to be funded under the Facility with Generate Lending described above and (ii) modify the definition of “Project Roundtrip Transaction” to increase the investment amount under a Project Roundtrip Transaction to $40.0 million.

On February 28, 2019, we and Hercules (and various affiliated entities) entered into the sixth amendment to the loan and security agreement (such amendment, the “Hercules Amendment”), which is effective as of February 22, 2019. Under the Hercules Amendment, we are required, at all times following February 22, 2019 through March 31, 2019, to maintain an unrestricted cash balance of at least (a) 50% of the outstanding loan balance, plus (b) the amount of accounts payable (as defined under GAAP) not paid within 90 days of the invoice date, in accounts subject to an account control agreement in favor of Hercules. Further, at all times after March 31, 2019, we are required to maintain an unrestricted cash balance of at least (a) 75% of the outstanding loan balance, plus (b) the amount of accounts payable (as defined under GAAP) not paid within 90 days of the invoice date, in accounts subject to an account control agreement in favor of Hercules. In addition, in the event of prepayment, the Hercules Amendment requires the payment of a prepayment charge equal to the following percentage of the advance amount being prepaid: (a) if such advance amounts are prepaid in any of the first twelve months following February 22, 2019, 2.00%, and (b) thereafter, 1.00%. In connection with the execution of the Hercules Amendment, we paid a $250,000 non-refundable fee to Hercules.

In November 2015, we closed on a definitive Assistance Agreement with the State of Connecticut and received a disbursement of $10.0 million which was used for the first phase of the expansion of our Torrington, Connecticut manufacturing facility. In conjunction with this financing, we entered into a $10.0 million promissory note and related security agreements securing the loan with equipment liens and a mortgage on its Danbury, Connecticut location. Under the Agreement, we were eligible for forgiveness of up to 50 percent of the loan principal if we created 165 full-time positions and retained 538 full-time positions for two consecutive years (the “Employment Obligation”) as measured on October 28, 2017 (the “Target Date”). The Agreement was subsequently amended in April 2017 to extend the Target Date by two years to October 28, 2019.

In January 2019, we entered into a Second Amendment to the Assistance Agreement (the “Second Amendment”). The Second Amendment extends the Target Date to October 31, 2022 and amends the Employment Obligation to require us to maintain 538 full-time positions for 24 consecutive months. If we meet the Employment Obligation, as modified by the Second Amendment, and create an additional 91 full-time positions, we may receive a credit in the amount of $2 million to be applied against the outstanding balance of the loan.

As discussed above, on July 30, 2014, our subsidiary, FuelCell Finance, entered into a Loan Agreement with NRG. Pursuant to the Loan Agreement, NRG extended a $40.0 million Loan Facility to FuelCell Finance for the purpose of accelerating project development by the Company and its subsidiaries. Under the Loan Agreement, FuelCell Finance and its subsidiaries were permitted to draw on the Loan Facility to finance the construction of projects through the commercial operating date of the power plants. Additionally, FuelCell Finance had the option to continue the financing term for each project after the commercial operating date for a maximum term of five years per project. The interest rate is 8.5 percent per annum for construction-period financing and 8.0 percent thereafter.

On December 13, 2018, FuelCell Finance’s wholly owned subsidiary, Central CA Fuel Cell 2, LLC, drew a construction loan advance of $5.8 million under the Loan Facility. This advance will be used to support the completion of construction of the 2.8 MW Tulare BioMAT project in California. This plant is expected to meet its commercial operations date in March 2019. In conjunction with the December 13, 2018 draw, FuelCell Finance and NRG entered into an amendment to the Loan Agreement (the “Amendment”) to revise the definitions of the terms “Maturity Date” and “Project Draw Period” under the Loan Agreement and to make other related revisions. Prior to the Amendment, FuelCell Finance and its subsidiaries were able to request draws under the Loan Facility through July 30, 2019 and the maturity date of each note under the Loan Facility was five years after the first disbursement under such note. Pursuant to the Amendment, FuelCell Finance and its subsidiaries could only request draws only through December 31, 2018 and the maturity date of each note is the earlier of (a) March 31, 2019 and (b) the commercial operation date or substantial completion date, as applicable, with respect to the fuel cell project owned by the borrower under such note. There are currently no other drawdowns or outstanding balances under the Loan Facility.

In March 2013, we closed on a long-term loan agreement with the Clean Energy Finance and Investment Authority, now known as the Connecticut Green Bank, totaling $5.9 million in support of the Bridgeport fuel cell park project. The loan agreement carries an interest rate of 5.0 percent per annum and principal repayments will commence on the eighth anniversary of the project’s provisional acceptance date which is December 20, 2021. Outstanding amounts are secured by future cash flows from the Bridgeport fuel cell park contracts. The outstanding balance on the Connecticut Green Bank Note as of January 31, 2019 was $6.1 million.

On January 9, 2019, we, through our indirect wholly-owned subsidiary TRS Fuel Cell, LLC, entered into a Loan and Security Agreement (the “Enhanced Capital Loan Agreement”) with Enhanced Capital Connecticut Fund V. LLC in the amount of $1.5 million. Interest will accrue at a rate of 6.0% per annum, calculated on a 30/360 basis, on all outstanding principal, paid on the first business day of each month. The loan maturity date is three years from the date of the Enhanced Capital Loan Agreement upon which the outstanding principal and accrued interest will be payable.

We have pledged approximately $40.5 million of our cash and cash equivalents as performance security and for letters of credit for certain banking requirements and contracts. As of January 31, 2019, outstanding letters of credit totaled $2.6 million. These expire on various dates through August 2025. Under the terms of certain contracts, we will provide performance security for future contractual obligations. The restricted cash balance as of January 31, 2019 includes $15.0 million which was placed in a Grantor’s Trust account to secure certain of our obligations under the 15-year service agreement for the Bridgeport fuel cell park project and is reflected as long-term restricted cash. The restrictions on the $15.0 million will be removed upon completion of the final module exchange at the Bridgeport fuel cell park project under the terms of the service agreement. The restricted cash balance as of January 31, 2019 also includes $17.4 million primarily to support obligations of the power purchase and service agreements related to the PNC sale-leaseback transactions.

As of October 31, 2018, we had uncertain tax positions aggregating $15.7 million and have reduced our NOL carryforwards by this amount. Because of the level of NOLs and valuation allowances, unrecognized tax benefits, even if not resolved in our favor, would not result in any cash payment or obligation and therefore have not been included in the contractual obligation table under the heading “Commitments and Significant Contractual Obligations.”

In addition to the commitments listed in the table under the heading “Commitments and Significant Contractual Obligations,” we have the following outstanding obligations:

#### Power purchase agreements

Under the terms of our PPAs, customers agree to purchase power from our fuel cell power plants at negotiated rates. Electricity rates are generally a function of the customers’ current and estimated future electricity pricing available from the grid. We are responsible for all operating costs necessary to maintain, monitor and repair our fuel cell power plants. Under certain agreements, we are also responsible for procuring fuel, generally natural gas or biogas, to run our fuel cell power plants. In addition, under certain agreements, we are required to produce minimum amounts of power under our PPAs and we have the right to terminate PPAs by giving written notice to the customer, subject to certain exit costs. As of January 31, 2019, our operating portfolio was 11.2 MW.

#### Service and warranty agreements

We warranty our products for a specific period of time against manufacturing or performance defects. Our standard U.S. warranty period is generally fifteen months after shipment or twelve months after acceptance of the product. In addition to the standard product warranty, we have contracted with certain customers to provide services to ensure the power plants meet minimum operating levels for terms of up to twenty years. Pricing for service contracts is based upon estimates of future costs, which could be materially different from actual expenses. Refer to “Critical Accounting Policies and Estimates” for additional details.

#### Advanced Technologies contracts

We have contracted with various government agencies and certain companies from private industry to conduct research and development as either a prime contractor or sub-contractor under multi-year, cost-reimbursement and/or cost-share type contracts or cooperative agreements. Cost-share terms require that participating contractors share the total cost of the project based on an agreed upon ratio. In many cases, we are reimbursed only a portion of the costs incurred or to be incurred on the contract. While government research and development contracts may extend for many years, funding is often provided incrementally on a year-by-year basis if contract terms are met and Congress authorizes the funds. As of January 31, 2019, Advanced Technologies contracts backlog totaled $37.0 million, of which $25.6 million is funded and $11.4 million is unfunded. Should funding be terminated or delayed or if business initiatives change, we may choose to devote resources to other activities, including internally funded research and development.

#### Off-Balance Sheet Arrangements

We have no off-balance sheet debt or similar obligations, other than operating leases, which are not classified as debt. We do not guarantee any third-party debt. See Note 16 “Commitments and Contingencies” to our consolidated financial statements for the three months ended January 31, 2019 included in this Quarterly Report on Form 10-Q for further information.

### CRITICAL ACCOUNTING POLICIES AND ESTIMATES

The preparation of financial statements and related disclosures requires management to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and the disclosure of contingent assets and liabilities. Actual results could differ from those estimates. Estimates are used in accounting for, among other things, revenue recognition, contract loss accruals, excess, slow-moving and obsolete inventories, product warranty accruals, loss accruals on service agreements, share-based compensation expense, allowance for doubtful accounts, depreciation and amortization, impairment of goodwill and in-process research and development intangible assets, impairment of long-lived assets (including project assets), income taxes and contingencies. Estimates and assumptions are reviewed periodically, and the effects of revisions are reflected in the consolidated financial statements in the period they are determined to be necessary.

Our critical accounting policies are those that are both most important to our financial condition and results of operations and require the most difficult, subjective or complex judgments on the part of management in their application, often as a result of the need to make estimates about the effect of matters that are inherently uncertain. For a complete description of our critical accounting policies that affect our more significant judgments and estimates used in the preparation of our condensed consolidated financial statements, refer to our Annual Report on Form 10-K for the year ended October 31, 2018 filed with the Securities and Exchange Commission.

Effective November 1, 2018, we adopted Topic 606. See “Note 3 – Revenue Recognition” included in our Notes to Consolidated Financial Statements for changes to our critical accounting policies as a result of adopting Topic 606. Other than changes to our revenue recognition policy as a result of adopting Topic 606 there have been no significant changes to the critical accounting policies disclosed in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in our 2018 Annual Report on Form 10-K.

### ACCOUNTING GUIDANCE UPDATE

See Note 2, “Recent Accounting Pronouncements,” to our Consolidated Financial Statements included in this Quarterly Report on Form 10-Q for a summary of recently adopted accounting guidance, as well as recent accounting guidance that is not yet effective.

## Market risk

As filed, 2,411 characters.

### Interest Rate Exposure

Cash is invested overnight with high credit quality financial institutions and therefore we are not exposed to market risk on our cash holdings from changing interest rates. Based on our overall interest rate exposure as of January 31, 2019, including all interest rate sensitive instruments, a change in interest rates of 1% would not have a material impact on our results of operations.

### Foreign Currency Exchange Risk

As of January 31, 2019, approximately 2% of our total cash and cash equivalents were in currencies other than U.S. dollars (primarily the Euro, Canadian dollars and South Korean Won) and we have no plans of repatriation. The Company had sales and accounts receivable denominated in foreign currencies and had outstanding accounts receivable denominated in foreign currencies as of January 31, 2019. We make purchases from certain vendors in currencies other than U.S. dollars. Although we have not experienced significant foreign exchange rate losses to date, we may in the future, especially to the extent that we do not engage in currency hedging activities. The economic impact of currency exchange rate movements on our operating results is complex because such changes are often linked to variability in real growth, inflation, interest rates, governmental actions and other factors. These changes, if material, may cause us to adjust our financing and operating strategies.

### Derivative Fair Value Exposure

#### Series 1 Preferred Shares

The conversion feature and the variable dividend obligation of FCE FuelCell Energy Ltd.’s (“FCE Ltd.”) Class A Cumulative Redeemable Exchangeable Preferred Shares (“Series 1 Preferred Shares”) are embedded derivatives that require bifurcation from the host contract. The aggregate fair value of these derivatives included within long-term debt and other liabilities as of January 31, 2019 and October 31, 2018 was $0.8 million. The fair value was based on valuation models using various assumptions, including historical stock price volatility, risk-free interest rate and a credit spread based on the yield indexes of technology high yield bonds, foreign exchange volatility as the Series 1 Preferred Shares are denominated in Canadian dollars, and the closing price of our common stock. Changes in any of these assumptions would change the underlying fair value with a corresponding charge or credit to operations.

## Controls and procedures

As filed, 2,078 characters.

The Company maintains disclosure controls and procedures, which are designed to provide reasonable assurance that information required to be disclosed in the Company’s periodic SEC reports is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to its principal executive officer and principal financial officer, as appropriate, to allow timely decisions regarding required disclosure.

We carried out an evaluation, under the supervision and with the participation of our principal executive officer and principal financial officer, of the effectiveness of the design and operation of our disclosure controls and procedures as of the end of the period covered by this report. Based on that evaluation, the Company’s principal executive officer and principal financial officer have concluded that the Company’s disclosure controls and procedures were effective to provide reasonable assurance that information required to be disclosed in the Company’s periodic SEC reports is recorded, processed, summarized, and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to its principal executive officer and principal financial officer, as appropriate, to allow timely decisions regarding required disclosure.

Effective November 1, 2018, we adopted the new revenue recognition guidance under Topic 606 using the modified retrospective method of adoption. The adoption of this guidance required the implementation of new accounting policies and processes which changed the Company’s internal controls over financial reporting for revenue recognition and related disclosures for the three months ended January 31, 2019.

Except as described above, there has been no change in our internal controls over financial reporting that occurred during the last fiscal quarter that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 89,416 characters.

You should carefully consider the following risk factors before making an investment decision. If any of the following risks actually occur, our business, financial condition, or results of operations could be materially and adversely affected. In such cases, the trading price of our common stock could decline, and you may lose all or part of your investment.

### We have incurred losses and anticipate continued losses and negative cash flow.

We have transitioned from a research and development company to a commercial products manufacturer, services provider and developer. We have not been profitable since our year ended October 31, 1997. We expect to continue to incur net losses and generate negative cash flows until we can produce sufficient revenues and margins to cover our costs. We may never become profitable. Even if we do achieve profitability, we may be unable to sustain or increase our profitability in the future. For the reasons discussed in more detail below, there are uncertainties associated with our achieving and sustaining profitability. We have, from time to time, sought financing in the public markets in order to fund operations and will continue to do so. Our future ability to obtain such financing could be impaired by a variety of factors, including, but not limited to, the price of our common stock and general market conditions.

***Our cost reduction strategy may not succeed or may be significantly delayed, which may result in our inability to deliver improved margins.***

Our cost reduction strategy is based on the assumption that increases in production will result in economies of scale. In addition, our cost reduction strategy relies on advancements in our manufacturing process, global competitive sourcing, engineering design, reducing the cost of capital and technology improvements (including stack life and projected power output). Failure to achieve our cost reduction targets could have a material adverse effect on our results of operations and financial condition.

***We have debt outstanding and may incur additional debt in the future, which may adversely affect our financial condition and future financial results.***

Our total consolidated indebtedness was $104.4 million as of January 31, 2019. This includes approximately $62.8 million of debt at our project finance subsidiaries and $41.6 million of debt at the corporate level. The majority of our debt is long-term with $38.9 million due within twelve months as of January 31, 2019. Prior to January 31, 2019, we had approximately $40 million of borrowing capacity under a revolving construction and term project financing facility under which we drew down approximately $5.8 million in December 2018, which must be repaid by the earlier of commercial operation of our 2.8 MW Tulare BioMAT project in California or March 31, 2019. Pursuant to the agreement entered into in conjunction with the December 2018 draw, no further draws on this facility are permitted and the facility expires on March 31, 2019. On December 21, 2018, we entered into a $100 million construction loan agreement with Generate Lending, LLC and made an initial draw of $10 million. Our ability to make scheduled payments of the principal and interest or to refinance our indebtedness depends on our future performance, which is subject to economic, financial, competitive and other factors beyond our control. Our business may not generate cash flow from operations in the future sufficient to service our debt and make necessary capital expenditures. If we are unable to generate such cash flow, we may be required to adopt one or more alternatives, such as selling assets, restructuring operations, restructuring debt or obtaining additional equity capital on terms that may be onerous or dilutive.

It is also possible that we may incur additional indebtedness in the future in the ordinary course of business. If new debt is added to current debt levels, the risks described above could intensify.

Our debt agreements contain customary representations and warranties, affirmative and negative covenants, and events of default that entitle the lenders to cause our indebtedness under such debt agreements to become immediately due and payable. In addition, as of January 31, 2019, the Hercules Agreement, as amended, contained a financial covenant whereby we are required to maintain an unrestricted cash balance in accounts subject to an account control agreement in favor of Hercules of 75% of the outstanding loan balance plus the amount of accounts payable not paid within 90 days of the invoice date. On February 28, 2019, the Hercules Agreement was further amended such that, at all times following February 22, 2019 through March 31, 2019, we are required to maintain an unrestricted cash balance of at least (a) 50% of the outstanding loan balance, plus (b) the amount of accounts payable (as defined under GAAP) not paid within 90 days of the invoice date, in accounts subject to an account control agreement in favor of Hercules. Further, at all times after March 31, 2019, we are required to maintain an unrestricted cash balance of at least (a) 75% of the outstanding loan balance, plus (b) the amount of accounts payable (as defined under GAAP) not paid within 90 days of the invoice date, in accounts subject to an account control agreement in favor of Hercules. As of January 31, 2019, the outstanding loan balance under the Hercules Agreement was $25.5 million, including accretion of an end-of-term payment.

***Our products compete with products using other energy sources, and if the prices of the alternative sources are lower than energy sources used by our products, sales of our products will be adversely affected.***

Our power plants can operate on a variety of fuels including natural gas, renewable biogas, directed biogas and propane. If these fuels are not readily available or if their prices increase such that electricity produced by our products costs more than electricity provided by other generation sources, our products would be less economically attractive to potential customers. In addition, we have no control over the prices of several types of competitive energy sources such as solar, wind, oil, gas or coal or local utility electricity costs. Significant decreases (or short term increases) in the price of these technologies or fuels or grid delivered prices for electricity could also have a material adverse effect on our business because other generation sources could be more economically attractive to consumers than our products.

***Financial markets worldwide have experienced heightened volatility and instability, which may have a material adverse impact on the Company, our customers and our suppliers.***

Financial market volatility can affect the debt, equity and project finance markets. This may impact the amount of financing available to all companies, including companies with substantially greater resources, better credit ratings and more successful operating histories than ours. It is impossible to predict future financial market volatility and instability and the impact on the Company, and it may have a materially adverse effect on us for a number of reasons, such as:

- The long term nature of our sales cycle can require long lead times between application design, order booking and product fulfillment. For such sales, we often require substantial cash down payments in advance of delivery. Our growth strategy assumes that financing will be available for the Company to finance working capital or for our customers to provide down payments and to pay for our products. Financial market issues may delay, cancel or restrict the construction budgets and funds available to the Company or our customers for the deployment of our products and services.
- Projects using our products are, in part, financed by equity investors interested in tax benefits as well as by the commercial and governmental debt markets. The significant volatility in the U.S. and international stock markets causes significant uncertainty and may result in an increase in the return required by investors in relation to the risk of such projects.
- If we, our customers or our suppliers cannot obtain financing under favorable terms, our business may be negatively impacted.

***Our contracted projects may not convert to revenue, and our project pipeline may not convert to contracts, which may have a material adverse effect on our revenue and cash flow.***

Some of the orders we accept from customers require certain conditions or contingencies (such as permitting, interconnection or financing) to be satisfied, some of which are outside of our control. The time periods from receipt of a contract to installation may vary widely and are determined by a number of factors, including the terms of the customer contract and the customer’s site requirements. These same or similar conditions and contingencies may be required by financiers in order to draw on financing to complete a project. This could have an adverse impact on our revenue and cash flow and our ability to complete construction of a project.

***We have signed product sales contracts, engineering, procurement and construction contracts, PPAs and long-term service agreements with customers subject to contractual, technology and operating risks as well as market conditions that may affect our operating results.***

We apply the percentage of completion revenue recognition method to certain product sales contracts which are subject to estimates. On a quarterly basis, we perform a review process to help ensure that total estimated contract costs include estimates of costs to complete that are based on the most recent available information. The percentage of completion for the customer contracts based on this cost analysis is then applied to the total customer contract values to determine the total revenue to be recognized to date.

In certain instances, we have executed PPAs with the end-user of the power or site host of the fuel cell power plant. We may then sell the PPA to a project investor or retain the project and collect revenue from the sale of power over the term of the PPA, recognizing electricity revenue as power is generated and sold.

We have contracted under long-term service agreements with certain customers to provide service on our products over terms up to 20 years. Under the provisions of these contracts, we provide services to maintain, monitor, and repair customer power plants to meet minimum operating levels. Pricing for service contracts is based upon estimates of future costs including future module replacements. While we have conducted tests to determine the overall life of our products, we have not run certain of our products over their projected useful life prior to large-scale commercialization. As a result, we cannot be sure that our products will last to their expected useful life, which could result in warranty claims, performance penalties, maintenance and module replacement costs in excess of our estimates and losses on service contracts.

Our ability to proceed with projects under development and complete construction of projects on schedule and within budget may be adversely affected by escalating costs for materials, tariffs, labor and regulatory compliance, inability to obtain necessary permits, interconnections or other approvals on acceptable terms or on schedule and by other factors. If any development project or construction is not completed, is delayed or is subject to cost overruns, we could become obligated to make delay or termination payments or become obligated for other damages under contracts, experience diminished returns or write off all or a portion of our investment in the project. Each of these events could have an adverse effect on our business, financial condition, results of operations and prospects.

***Our growing generation portfolio of operating assets exposes us to operational risks and commodity market volatility.***

We have a growing portfolio of generation assets selling power under PPAs and utility tariff programs that exposes us to operational risks and uncertainties, including, among other things, lost revenues due to prolonged outages, replacement equipment costs, risks associated with facility start-up operations, failures in the availability or acquisition of fuel, the impact of severe adverse weather conditions, natural disasters, terrorist attacks, risks of property damage or injury from energized equipment, availability of adequate water resources and ability to intake and discharge water, use of new or unproven technology, fuel commodity price risk and fluctuating market prices, and lack of alternative available fuel sources.

### We extend product warranties, which could affect our operating results.

We provide for a warranty of our products for a specific period of time against manufacturing or performance defects. We accrue for warranty costs based on historical warranty claim experience, however, actual future warranty expenses may be greater than we have assumed in our estimates. As a result, operating results could be negatively impacted should there be product manufacturing or performance defects in excess of our estimates.

***Our products are complex and could contain defects and may not operate at expected performance levels which could impact sales and market adoption of our products or result in claims against us.***

We develop complex and evolving products and we continue to advance the capabilities of our fuel cell stacks and are now producing stacks with a net rated power output of 350 kilowatts and an expected seven-year life.

We are still gaining field operating experience with respect to our products, and despite experience gained from our growing installed base and testing performed by us, our customers and our suppliers, issues may be found in existing or new products. This could result in a delay in recognition or loss of revenues, loss of market share or failure to achieve broad market acceptance. The occurrence of defects could also cause us to incur significant warranty, support and repair costs, could divert the attention of our engineering personnel from our product development efforts, and could harm our relationships with our customers. The occurrence of these problems could result in the delay or loss of market acceptance of our products and would likely harm our business. Defects or performance problems with our products could result in financial or other damages to our customers. From time to time, we have been involved in disputes regarding product warranty issues. Although we seek to limit our liability, a product liability claim brought against us, even if unsuccessful, would likely be time consuming, could be costly to defend, and may hurt our reputation in the marketplace. Our customers could also seek and obtain damages from us for their losses. We have accrued liabilities for potential damages related to performance problems, however, actual results may be different than the assumptions used in our accrual calculations.

### We currently face and will continue to face significant competition.

We compete on the basis of our products’ reliability, efficiency, environmental considerations and cost. Technological advances in alternative energy products or improvements in the electric grid or other sources of power generation, or other fuel cell technologies may negatively affect the development or sale of some or all of our products or make our products non-competitive or obsolete prior to or after commercialization. Other companies, some of which have substantially greater resources than ours, are currently engaged in the development of products and technologies that are similar to, or may be competitive with, our products and technologies.

Several companies in the U.S. are engaged in fuel cell development, although we are the only domestic company engaged in manufacturing and deployment of stationary carbonate fuel cells. Other emerging fuel cell technologies (and the companies developing them) include small or portable proton-exchange membrane (“PEM”) fuel cells (Ballard Power Systems, Plug Power, and increasing activity by numerous automotive companies including Toyota, Hyundai, Honda and GM), stationary phosphoric acid fuel cells (Doosan), stationary solid oxide fuel cells (Bloom Energy), and small residential solid oxide fuel cells (Ceres Power Holdings and Ceramic Fuel Cells Ltd.). Each of these competitors has the potential to capture market share in our target markets. There are also other potential fuel cell competitors internationally that could capture market share.

Other than fuel cell developers, we must also compete with companies that manufacture more mature combustion-based equipment, including various engines and turbines, and have well-established manufacturing, distribution, operating and cost features. Electrical efficiency of these products can be competitive with our SureSource power plants in certain applications. Significant competition may also come from gas turbine companies and large scale solar and wind technologies.

***We derive significant revenue from contracts awarded through competitive bidding processes involving substantial costs and risks. Due to this competitive pressure, we may be unable to grow revenue and achieve profitability.***

We expect a significant portion of the business that we will seek in the foreseeable future will be awarded through competitive bidding against other fuel cell technologies and other forms of power generation. The competitive bidding process involves substantial costs and a number of risks, including the significant cost and managerial time to prepare bids and proposals for contracts that may not be awarded to us and our failure to accurately estimate the resources and costs that will be required to fulfill any contract we win. In addition, following a contract award, we may encounter significant expense, delay or contract modifications as a result of our competitors protesting or challenging contracts awarded to us in competitive bidding. In addition, multi-award contracts require that we make sustained post-award efforts to obtain task orders under the contract. We may not be able to obtain task orders or recognize revenue under these multi-award contracts. Our failure to compete effectively in this procurement environment could adversely affect our revenue and/or profitability.

***Unanticipated increases or decreases in business growth may result in adverse financial consequences for us.***

If our business grows more quickly than we anticipate, our existing and planned manufacturing facilities may become inadequate and we may need to seek out new or additional space, at considerable cost to us. If our business does not grow as quickly as we expect, our existing and planned manufacturing facilities would, in part, represent excess capacity for which we may not recover the cost. In that circumstance, our revenues may be inadequate to support our committed costs and our planned growth, and our gross margins and business strategy would be adversely affected.

### Our plans are dependent on market acceptance of our products.

Our plans are dependent upon market acceptance of, as well as enhancements to, our products. Fuel cell systems represent an emerging market, and we cannot be sure that potential customers will accept fuel cells as a replacement for traditional power sources. As is typical in a rapidly evolving industry, demand and market acceptance for recently introduced products and services are subject to a high level of uncertainty and risk. Since the distributed generation market is still evolving, it is difficult to predict with certainty the size of the market and its growth rate. The development of a market for our products may be affected by many factors that are out of our control, including:

- the cost competitiveness of our fuel cell products including availability and output expectations and total cost of ownership;
- the future costs of natural gas and other fuels used by our fuel cell products;
- customer reluctance to try a new product;
- the market for distributed generation and government policies that affect that market;
- local permitting and environmental requirements;
- customer preference for non-fuel based technologies; and
- the emergence of newer, more competitive technologies and products.

If a sufficient market fails to develop or develops more slowly than we anticipate, we may be unable to recover the losses we will have incurred in the development of our products and may never achieve profitability.

As we continue to expand markets for our products, we intend to continue offering power production guarantees and other terms and conditions relating to our products that will be acceptable to the marketplace, and continue to develop a service organization that will aid in servicing our products and obtain self-regulatory certifications, if available, with respect to our products. Failure to achieve any of these objectives may also slow the development of a sufficient market for our products and, therefore, have a material adverse effect on our results of operations and financial condition.

***We are substantially dependent on a concentrated number of customers and the loss of any one of these customers could adversely affect our business, financial condition and results of operations.***

We contract with a concentrated number of customers for the sale of products and for research and development contracts. There can be no assurance that we will continue to achieve the current level of sales of our products to our largest customers. Even though our customer base is expected to increase and our revenue streams to diversify, a substantial portion of net revenues could continue to depend on sales to a limited number of customers. Our agreements with these customers may be canceled if we fail to meet certain product specifications or materially breach the agreements, or if our customers materially breach the agreements, and our customers may seek to renegotiate the terms of current agreements or renewals. The loss of, or a reduction in sales to, one or more of our larger customers could have a material adverse effect on our business, financial condition and results of operations.

***Recent developments with POSCO Energy may limit our efforts to access the South Korean and Asian markets and could expose us to costs of arbitration or litigation proceedings.***

We have historically relied on POSCO Energy to develop and grow the South Korean and Asian markets for our products and services. We entered into manufacturing and technology transfer agreements with POSCO Energy in 2007, 2009 and 2012, each of which expires on October 31, 2027. The Cell Technology Transfer Agreement (“CTTA”) provides POSCO Energy with the technology rights to manufacture SureSource power plants in South Korea and the right to sell power plants throughout Asia. The CTTA requires POSCO Energy to pay to the Company a 3.0% royalty on POSCO Energy net product sales, as well as a royalty on scheduled fuel cell module replacements under service agreements for modules that were built by POSCO Energy and installed at plants in Asia under the terms of long term service agreements between POSCO Energy and its customers. In March 2017, we entered into a memorandum of understanding (“MOU”) with POSCO Energy to permit us to directly develop the Asian fuel cell business, including the right for us to sell SureSource solutions in South Korea and the broader Asian market. In June 2018, POSCO Energy advised us in writing that it was terminating the MOU effective July 15, 2018. Pursuant to the terms of the MOU, notwithstanding its termination, we will continue to execute on sales commitments in Asia secured in writing prior to July 15, 2018. POSCO Energy has ceased communications with us.

On or about November 2, 2018, POSCO Energy served us with an arbitration demand, initiating a proceeding to resolve various outstanding amounts between the companies. Although we have made counterclaims and believe we have valid defenses, we cannot predict the outcome of this or any other proceeding.

In light of recent developments with POSCO Energy, we are evaluating all of our options with respect to our relationship and agreements with POSCO Energy. We cannot predict the outcome of any future discussions with POSCO Energy, if they occur, the future status or scope of our relationship with POSCO Energy, whether our relationship with POSCO Energy will continue in the future, or whether we will become involved in additional mediations, arbitrations, litigation or other proceedings with POSCO Energy, what the costs of any such proceedings will be or the effect of such proceedings on the market. Any such proceedings could result in significant expense to us and adversely affect our business and financial condition and reputation in the market, whether or not such proceedings are resolved in our favor. If our relationship with POSCO Energy ends, or continues on terms that are less favorable to us, or remains unresolved, our efforts to access the South Korean and Asian markets, which are complex markets, may not be successful or may be limited, hindered or delayed.

***If our goodwill and other intangible assets, long-lived assets, inventory or project assets become impaired, we may be required to record a significant charge to earnings.***

We may be required to record a significant charge to operations in our financial statements should we determine that our goodwill, IPR&D, long-lived assets (i.e., property, plant and equipment), inventory, or project assets are impaired. Such a charge might have a significant impact on our reported financial position and results of operations.

As required by accounting rules, we review our goodwill for impairment at least annually as of July 31 or more frequently if facts and circumstances indicate that it is more likely than not that the fair value of a reporting unit that has goodwill is less than its carrying value. Factors that may be considered a change in circumstances indicating that the carrying value of our goodwill might not be recoverable include a significant decline in projections of future cash flows and lower future growth rates in our industry. We review IPR&D for impairment on an annual basis as of July 31 or more frequently if facts and circumstances indicate the fair value is less than the carrying value. If the technology has been determined to be abandoned or not recoverable, we would be required to impair the asset. We review inventory, long-lived assets and project assets for impairment whenever events or changes in circumstances indicate the carrying amount may not be recoverable. We consider a project commercially viable and recoverable if it is anticipated to be sellable for a profit, or generates positive cash flows, once it is either fully developed or fully constructed. If our projects are not considered commercially viable, we would be required to impair the respective project assets.

### We have risks associated with high levels of inventory.

The amount of total inventory as of January 31, 2019 and October 31, 2018 was $54.8 million and $53.6 million, respectively, which includes work in process inventory totaling $26.8 million and $29.1 million, respectively. We previously reduced our production rate and have been operating at a lower level for a period of time in order to deploy inventory to new projects and mitigate future increases in inventory. We recently announced that we are beginning to increase our production rate to prior levels. There is no guarantee, however, that we will be successful in deploying our existing inventory or the new inventory generated by increased production. In addition, there are risks that our inventory could lose some or all of its value due to technological obsolescence, shifts in market demand or other unexpected changes in industry conditions and circumstances. If we are unable to deploy our current inventory or new inventory consistent with our business plan, we may be required to sell it at a loss, abandon it or recycle it into different products. These actions would result in a significant charge to earnings. Such a charge might have a significant impact on our financial position and results of operations.

***Our advanced technologies contracts are subject to the risk of termination by the contracting party and we may not realize the full amounts allocated under the contracts due to the lack of Congressional appropriations.***

A portion of our fuel cell revenues has been derived from long-term cooperative agreements and other contracts with the U.S. Department of Energy and other U.S. government agencies. These agreements are important to the continued development of our technology and our products. We also contract with private sector companies under certain advanced technologies contracts to develop strategically important and complementary offerings.

Generally, our government research and development contracts are subject to the risk of termination at the convenience of the contracting agency. Furthermore, these contracts, irrespective of the amounts allocated by the contracting agency, are subject to annual Congressional appropriations and the results of government or agency sponsored reviews and audits of our cost reduction projections and efforts. We can only receive funds under these contracts ultimately made available to us annually by Congress as a result of the appropriations process. Accordingly, we cannot be sure whether we will receive the full amounts awarded under our government research and development or other contracts. Failure to receive the full amounts under any of our government research and development contracts could materially and adversely affect our business prospects, results of operations and financial condition.

***A negative government audit could result in an adverse adjustment of our revenue and costs and could result in civil and criminal penalties.***

Government agencies, such as the Defense Contract Audit Agency, routinely audit and investigate government contractors. These agencies review a contractor’s performance under its contracts, cost structure, and compliance with applicable laws, regulations, and standards. If the agencies determine through these audits or reviews that we improperly allocated costs to specific contracts, they will not reimburse us for these costs. Therefore, an audit could result in adjustments to our revenue and costs.

Further, although we have internal controls in place to oversee our government contracts, no assurance can be given that these controls are sufficient to prevent isolated violations of applicable laws, regulations and standards. If the agencies determine that we or one of our subcontractors engaged in improper conduct, we may be subject to civil or criminal penalties and administrative sanctions, payments, fines, and suspension or prohibition from doing business with the government, any of which could materially affect our results of operations and financial condition.

***The U.S. government has certain rights relating to our intellectual property, including the right to restrict or take title to certain patents.***

Multiple U.S. patents that we own have resulted from government-funded research and are subject to the risk of exercise of “march-in” rights by the government. March-in rights refer to the right of the U.S. government or a government agency to exercise its non-exclusive, royalty-free, irrevocable worldwide license to any technology developed under contracts funded by the government if the contractor fails to continue to develop the technology. These “march-in” rights permit the U.S. government to take title to these patents and license the patented technology to third parties if the contractor fails to utilize the patents.

### Our future success and growth is dependent on our market strategy.

We cannot assure you that we will enter into business relationships that are consistent with, or sufficient to support, our commercialization plans and our growth strategy or that these relationships will be on terms favorable to us. Even if we enter into these types of relationships, we cannot assure you that the business associates with whom we form relationships will focus adequate resources on selling our products or will be successful in selling them. Some of these arrangements have required or will require that we grant exclusive rights to certain companies in defined territories. These exclusive arrangements could result in our being unable to enter into other arrangements at a time when the business associate with whom we form a relationship is not successful in selling our products or has reduced its commitment to marketing our products. In addition, future arrangements may also include the issuance of equity and/or warrants to purchase our equity, which may have an adverse effect on our stock price and would dilute our existing stockholders. To the extent we enter into partnerships or other business relationships, the failure of these partners or other business associates to assist us with the deployment of our products may adversely affect our results of operations and financial condition.

***We depend on third party suppliers for the development and supply of key raw materials and components for our products.***

We use various raw materials and components to construct a fuel cell module, including nickel and stainless steel which are critical to our manufacturing process. We also rely on third-party suppliers for the balance-of-plant components in our products. Suppliers must undergo a qualification process, which takes four to twelve months. We continually evaluate new suppliers, and we are currently qualifying several new suppliers. There are a limited number of suppliers for some of the key components of our products. A supplier’s failure to develop and supply components in a timely manner or to supply components that meet our quality, quantity or cost requirements or our technical specifications, or our inability to obtain alternative sources of these components on a timely basis or on terms acceptable to us could harm our ability to manufacture our SureSource products. In addition, to the extent the processes that our suppliers use to manufacture components are proprietary, we may be unable to obtain comparable components from alternative suppliers.

We do not know whether we will be able to maintain long-term supply relationships with our critical suppliers, or secure new long-term supply relationships, or whether such relationships will be on terms that will allow us to achieve our objectives. Our business prospects, results of operations and financial condition could be harmed if we fail to secure long-term relationships with entities that will supply the required components for our SureSource products.

***We depend on our intellectual property, and our failure to protect that intellectual property could adversely affect our future growth and success.***

Failure to protect our existing intellectual property rights may result in the loss of our exclusivity or the right to use our technologies. If we do not adequately ensure our freedom to use certain technology, we may have to pay others for rights to use their intellectual property, pay damages for infringement or misappropriation, or be enjoined from using such intellectual property. We rely on patent, trade secret, trademark and copyright law to protect our intellectual property. In addition, we have licensed our carbonate fuel cell manufacturing intellectual property to POSCO Energy, and we depend on POSCO Energy to also protect our intellectual property rights as licensed. As of January 31, 2019, we, excluding our subsidiaries, had 94 U.S. patents and 142 patents in other jurisdictions covering our fuel cell technology (in certain cases covering the same technology in multiple jurisdictions), with patents directed to various aspects of our SureSource technology, SOFC technology, PEM fuel cell technology and applications thereof. As of January 31, 2019, we also had 72 patent applications pending in the U.S. and 142 patent applications pending in other jurisdictions. Our U.S. patents will expire between 2019 and 2036, and the current average remaining life of our U.S. patents is approximately 8.8 years. Our subsidiary, Versa Power Systems, Ltd., as of January 31, 2019, had 35 U.S. patents and 79 international patents covering the SOFC technology (in certain cases covering the same technology in multiple jurisdictions), with an average remaining U.S. patent life of approximately 6.0 years. As of January 31, 2019, Versa Power Systems, Ltd. also had three pending U.S. patent applications and 11 patent applications pending in other jurisdictions. In addition, as January 31, 2019, our subsidiary, FuelCell Energy Solutions, GmbH, had license rights to two U.S. patents and seven patents outside the U.S. for carbonate fuel cell technology licensed from Fraunhofer IKTS.

Some of our intellectual property is not covered by any patent or patent application and includes trade secrets and other know-how that is not able to be patented, particularly as it relates to our manufacturing processes and engineering design. In addition, some of our intellectual property includes technologies and processes that may be similar to the patented technologies and processes of third parties. If we are found to be infringing third-party patents, we do not know whether we will be able to obtain licenses to use such patents on acceptable terms, if at all. Our patent position is subject to complex factual and legal issues that may give rise to uncertainty as to the validity, scope, and enforceability of a particular patent.

We cannot assure you that any of the U.S. or international patents owned by us or other patents that third parties license to us will not be invalidated, circumvented, challenged, rendered unenforceable or licensed to others, or that any of our pending or future patent applications will be issued with the breadth of claim coverage sought by us, if issued at all. In addition, effective patent, trademark, copyright and trade secret protection may be unavailable, limited or not applied for in certain foreign countries.

We also seek to protect our proprietary intellectual property, including intellectual property that may not be patented or able to be patented, in part by confidentiality agreements and, if applicable, inventors’ rights agreements with our subcontractors, vendors, suppliers, consultants, strategic business associates and employees. We cannot assure you that these agreements will not be breached, that we will have adequate remedies for any breach or that such persons or institutions will not assert rights to intellectual property arising out of these relationships. Certain of our intellectual property has been licensed to us on a non-exclusive basis from third parties that may also license such intellectual property to others, including our competitors. If our licensors are found to be infringing third-party patents, we do not know whether we will be able to obtain licenses to use the intellectual property licensed to us on acceptable terms, if at all.

If necessary or desirable, we may seek extensions of existing licenses or further licenses under the patents or other intellectual property rights of others. However, we can give no assurances that we will obtain such extensions or further licenses or that the terms of any offered licenses will be acceptable to us. The failure to obtain a license from a third party for intellectual property that we use at present could cause us to incur substantial liabilities, and to suspend the manufacture or shipment of products or our use of processes requiring the use of that intellectual property.

While we are not currently engaged in any intellectual property litigation, we could become subject to lawsuits in which it is alleged that we have infringed the intellectual property rights of others or commence lawsuits against others who we believe are infringing our rights or violating their agreements to protect our intellectual property. Our involvement in intellectual property litigation could result in significant expense to us, adversely affecting the development of sales of the challenged product or intellectual property and diverting the efforts of our technical and management personnel, whether or not that litigation is resolved in our favor.

***Our future success will depend on our ability to attract and retain qualified management, technical, and other personnel.***

Our future success is substantially dependent on the continued services and performance of our executive officers and other key management, engineering, scientific, manufacturing and operating personnel, particularly Arthur Bottone, our Chief Executive Officer. The loss of the services of any executive officer, including Mr. Bottone, or other key management, engineering, scientific, manufacturing and operating personnel, could materially adversely affect our business. Our ability to achieve our commercialization plans and to increase production at our manufacturing facility in the future will also depend on our ability to attract and retain additional qualified management, technical, manufacturing and operating personnel. Recruiting personnel for the fuel cell industry is competitive. We do not know whether we will be able to attract or retain additional qualified management, technical, manufacturing and operating personnel. Our inability to attract and retain additional qualified management, technical, manufacturing and operating personnel, or the departure of key employees, could materially and adversely affect our development, commercialization and manufacturing plans and, therefore, our business prospects, results of operations and financial condition. In addition, our inability to attract and retain sufficient management, technical, manufacturing and operating personnel to quickly increase production at our manufacturing facility when and if needed to meet increased demand may adversely impact our ability to respond rapidly to any new product, growth or revenue opportunities.

### Our management may be unable to manage rapid growth effectively.

Our fiscal year 2019 plan calls for an increase to our annual production rate. We may further rapidly expand our facilities and manufacturing capabilities, accelerate the commercialization of our products and enter a period of rapid growth, which will place a significant strain on our senior management team and our financial and other resources. Any expansion may expose us to increased competition, greater overhead, marketing and support costs and other risks associated with the commercialization of a new product. We would need to obtain sufficient backlog in order to maintain the use of the expanded capacity. Our ability to manage rapid growth effectively will require us to continue to secure adequate sources of capital and financing, improve our operations, improve our financial and management information systems and train, motivate and manage our employees. Difficulties in effectively managing issues presented by such a rapid expansion could harm our business prospects, results of operations and financial condition.

### We may be affected by environmental and other governmental regulation.

We are subject to various federal, state and local laws and regulations relating to, among other things, land use, safe working conditions, handling and disposal of hazardous and potentially hazardous substances and emissions of pollutants into the atmosphere. In addition, it is possible that industry-specific laws and regulations will be adopted covering matters such as transmission scheduling, distribution, emissions, and the characteristics and quality of our products, including installation and servicing. These regulations could limit the growth in the use of carbonate fuel cell products, decrease the acceptance of fuel cells as a commercial product and increase our costs and, therefore, the price of our products. Accordingly, compliance with existing or future laws and regulations could have a material adverse effect on our business prospects, results of operations and financial condition.

***Utility companies may resist the adoption of distributed generation and could impose customer fees or interconnection requirements on our customers that could make our products less desirable.***

Investor-owned utilities may resist adoption of distributed generation fuel cell plants as such plants are disruptive to the utility business model that primarily utilizes large central generation power plants and associated transmission and distribution. On-site distributed generation that is on the customer-side of the electric meter competes with the utility. Distributed generation on the utility-side of the meter generally has power output that is significantly less than central generation power plants and may be perceived by the utility as too small to materially impact its business, limiting its interest. Additionally, perceived technology risk may limit utility interest in stationary fuel cell power plants.

Utility companies commonly charge fees to larger, industrial customers for disconnecting from the electric grid or for having the capacity to use power from the electric grid for back up purposes. These fees could increase the cost to our customers of using our SureSource products and could make our products less desirable, thereby harming our business prospects, results of operations and financial condition.

***We could be liable for environmental damages resulting from our research, development or manufacturing operations.***

Our business exposes us to the risk of harmful substances escaping into the environment, resulting in personal injury or loss of life, damage to or destruction of property, and natural resource damage. Depending on the nature of the claim, our current insurance policies may not adequately reimburse us for costs incurred in settling environmental damage claims, and in some instances, we may not be reimbursed at all. Our business is subject to numerous federal, state, and local laws and regulations that govern environmental protection and human health and safety. We believe that our businesses are operating in compliance in all material respects with applicable environmental laws, however, these laws and regulations have changed frequently in the past and it is reasonable to expect additional and more stringent changes in the future.

Our operations may not comply with future laws and regulations and we may be required to make significant unanticipated capital and operating expenditures. If we fail to comply with applicable environmental laws and regulations, governmental authorities may seek to impose fines and penalties on us or to revoke or deny the issuance or renewal of operating permits and private parties may seek damages from us. Under those circumstances, we might be required to curtail or cease operations, conduct site remediation or other corrective action, or pay substantial damage claims.

***Our products use inherently dangerous, flammable fuels, operate at high temperatures and use corrosive carbonate material, each of which could subject our business to product liability claims.***

Our business exposes us to potential product liability claims that are inherent in products that use hydrogen. Our products utilize fuels such as natural gas and convert these fuels internally to hydrogen that is used by our products to generate electricity. The fuels we use are combustible and may be toxic. In addition, our SureSource products operate at high temperatures and use corrosive carbonate material, which could expose us to potential liability claims. Although we have incorporated a robust design and redundant safety features in our power plants, have established comprehensive safety, maintenance, and training programs, follow third-party certification protocols, codes and standards, and do not store natural gas or hydrogen at our power plants, we cannot guarantee that there will not be accidents. Any accidents involving our products or other hydrogen-using products could materially impede widespread market acceptance and demand for our products. In addition, we might be held responsible for damages beyond the scope of our insurance coverage. We also cannot predict whether we will be able to maintain adequate insurance coverage on acceptable terms.

### We are subject to risks inherent in international operations.

Since we market our products both inside and outside the U.S., our success depends in part on our ability to secure international customers and our ability to manufacture products that meet foreign regulatory and commercial requirements in target markets. Sales to customers located outside the U.S. accounts for a significant portion of our consolidated revenue. Sales to customers in South Korea represent the majority of our international sales. We have limited experience developing and manufacturing our products to comply with the commercial and legal requirements of international markets. In addition, we are subject to tariff regulations and requirements for export licenses, particularly with respect to the export of some of our technologies. We face numerous challenges in our international expansion, including unexpected changes in regulatory requirements and other geopolitical risks, fluctuations in currency exchange rates, longer accounts receivable requirements and collections, greater bonding and security requirements, difficulties in managing international operations, potentially adverse tax consequences, restrictions on repatriation of earnings and the burdens of complying with a wide variety of international laws. Any of these factors could adversely affect our results of operations and financial condition.

We source raw materials and parts for our products on a global basis, which subjects us to a number of potential risks, including the impact of export duties and quotas, trade protection measures imposed by the U.S. and other countries including tariffs, potential for labor unrest, changing global and regional economic conditions and current and changing regulatory environments. Changes to these factors may have an adverse effect on our ability to source raw materials and parts in line with our current cost structure.

Although our reporting currency is the U.S. dollar, we conduct our business and incur costs in the local currency of most countries in which we operate. As a result, we are subject to currency translation and transaction risk. Changes in exchange rates between foreign currencies and the U.S. dollar could affect our net sales and cost of sales and could result in exchange gains or losses. We cannot accurately predict the impact of future exchange rate fluctuations on our results of operations.

We could also expand our business into new and emerging markets, many of which have an uncertain regulatory environment relating to currency policy. Conducting business in such markets could cause our exposure to changes in exchange rates to increase, due to the relatively high volatility associated with emerging market currencies and potentially longer payment terms for our proceeds. Our ability to hedge foreign currency exposure is dependent on our credit profile with financial institutions that are willing and able to do business with us. Deterioration in our credit position or a significant tightening of the credit market conditions could limit our ability to hedge our foreign currency exposure; and therefore, result in exchange gains or losses.

***Exports of certain of our products are subject to various export control regulations and may require a license or permission from the U.S. Department of State, the U.S. Department of Energy or other agencies.***

As an exporter, we must comply with various laws and regulations relating to the export of products, services and technology from the U.S. and other countries having jurisdiction over our operations. We are subject to export control laws and regulations, including the International Traffic in Arms Regulation (“ITAR”), the Export Administration Regulation (“EAR”), and the Specially Designated Nationals and Blocked Persons List, which generally prohibit U.S. companies and their intermediaries from exporting certain products, importing materials or supplies, or otherwise doing business with restricted countries, businesses or individuals, and require companies to maintain certain policies and procedures to ensure compliance. We are also subject to the Foreign Corrupt Practices Act which prohibits improper payments to foreign governments and their officials by U.S. and other business entities. Under these laws and regulations, U.S. companies may be held liable for their actions and actions taken by their strategic or local partners or representatives. If we, or our intermediaries, fail to comply with the requirements of these laws and regulations, or similar laws of other countries, governmental authorities in the United States or elsewhere, as applicable, could seek to impose civil and/or criminal penalties, which could damage our reputation and have a material adverse effect on our business, financial condition and results of operations.

We are also subject to registration under the U.S. State Department’s Directorate of Defense Trade Controls (“DDTC”). Due to the nature of certain of our products and technology, we must obtain licenses or authorizations from various U.S. government agencies such as DDTC or DOE, before we are permitted to sell such products or license such technology outside of the U.S. We can give no assurance that we will continue to be successful in obtaining the necessary licenses or authorizations or that certain sales will not be prevented or delayed. Any significant impairment of our ability to sell products or license technology outside of the U.S. could negatively impact our results of operations, financial condition or liquidity.

***We depend on strategic relationships with third parties, and the terms and enforceability of many of these relationships are not certain.***

We have entered into strategic relationships with third parties for the design, product development, sale and service of our existing products and products under development, some of which may not have been documented by a definitive agreement and others of which may require renewal. The terms and conditions of many of these relationships allow for termination by the third parties. Termination or expiration of any of these relationships could adversely affect our ability to design, develop and distribute these products to the marketplace. We cannot assure you that we will be able to successfully negotiate and execute definitive agreements or renewals with any of these third parties, and failure to do so may effectively terminate the relevant relationship.

***If we fail to maintain an effective system of internal controls, we may not be able to accurately report our financial results or prevent fraud, which could harm our brand and operating results.***

Effective internal controls are necessary for us to provide reliable and accurate financial reports and effectively prevent fraud. We have devoted significant resources and time to comply with the internal control over financial reporting requirements of the Sarbanes-Oxley Act of 2002. In addition, Section 404 under the Sarbanes-Oxley Act of 2002 requires that we assess, and that our auditors attest to, the design and operating effectiveness of our controls over financial reporting. Our compliance with the annual internal control report requirement for each fiscal year will depend on the effectiveness of our financial reporting and data systems and controls. Inferior internal controls could cause investors to lose confidence in our reported financial information, which could have a negative effect on the trading price of our stock and our access to capital.

***We are increasingly dependent on information technology, and disruptions, failures or security breaches of our information technology infrastructure could have a material adverse effect on our operations. In addition, increased information technology security threats and more sophisticated computer crime pose a risk to our systems, networks, products and services.***

We rely on information technology networks and systems, including the Internet, to process, transmit and store electronic and financial information and to manage a variety of business processes and activities, including communication with power plants owned by us or our customers and production, manufacturing, financial, logistics, sales, marketing and administrative functions. Additionally, we collect and store data that is sensitive to us and to third parties. Operating these information technology networks and systems and processing and maintaining this data, in a secure manner, are critical to our business operations and strategy. We depend on our information technology infrastructure to communicate internally and externally with employees, customers, suppliers and others. We also use information technology networks and systems to comply with regulatory, legal and tax requirements and to operate our fuel cell power plants. These information technology systems, many of which are managed by third parties or used in connection with shared service centers, may be susceptible to damage, disruptions or shutdowns due to failures during the process of upgrading or replacing software, databases or components thereof, power outages, hardware failures, computer viruses, attacks by computer hackers or other cybersecurity risks, telecommunication failures, user errors, natural disasters, terrorist attacks or other catastrophic events. If any of our significant information technology systems suffer severe damage, disruption or shutdown, and our disaster recovery and business continuity plans do not effectively resolve the issues in a timely manner, our product sales, financial condition and results of operations may be materially and adversely affected, and we could experience delays in reporting our financial results, or our fuel cell power plant operations may be disrupted, exposing us to performance penalties under our contracts with customers.

In addition, information technology security threats – from user error to cybersecurity attacks designed to gain unauthorized access to our systems, networks and data – are increasing in frequency and sophistication. Cybersecurity attacks may range from random attempts to coordinated and targeted attacks, including sophisticated computer crime and advanced persistent threats. These threats pose a risk to the security of our systems and networks and the confidentiality, availability and integrity of our data. Cybersecurity attacks could also include attacks targeting customer data or the security, integrity and/or reliability of the hardware and software installed in our products. We have experienced cybersecurity attacks that have resulted in unauthorized parties gaining access to our information technology systems and networks, and we could in the future experience similar attacks. However, to date, no cybersecurity attack has had a material impact on our financial condition, results of operations or liquidity. While we actively manage information technology security risks within our control, there can be no assurance that such actions will be sufficient to mitigate all potential risks to our systems, networks and data. In addition to the direct potential financial risk as we continue to build, own and operate generation assets, other potential consequences of a material cybersecurity attack include reputational damage, litigation with third parties, disruption to systems, unauthorized release of confidential or otherwise protected information, corruption of data, diminution in the value of our investment in research, development and engineering, and increased cybersecurity protection and remediation costs, which in turn could adversely affect our competitiveness, results of operations and financial condition. The amount of insurance coverage we maintain may be inadequate to cover claims or liabilities relating to a cybersecurity attack.

***Litigation could expose us to significant costs and adversely affect our business, financial condition, and results of operations.***

We are, or may become, party to various lawsuits and claims arising in the ordinary course of business, which may include lawsuits or claims relating to commercial liability, product recalls, product liability, product claims, employment matters, environmental matters, or other aspects of our business. Litigation is inherently unpredictable, and although we may believe we have meaningful defenses in these matters, we may incur judgments or enter into settlements of claims that could have a material adverse effect on our business, financial condition, and results of operations. The costs of responding to or defending litigation may be significant and may divert the attention of management away from our strategic objectives. There may also be adverse publicity associated with litigation that may decrease customer confidence in our business, regardless of whether the allegations are valid or whether we are ultimately found liable. As a result, litigation may have a material adverse effect on our business, financial condition, and results of operations.

***Our results of operations could vary as a result of changes to our accounting policies or the methods, estimates and judgments we use in applying our accounting policies.***

The methods, estimates and judgments we use in applying our accounting policies have a significant impact on our results of operations. Such methods, estimates and judgments are, by their nature, subject to substantial risks, uncertainties and assumptions, and factors may arise over time that could lead us to reevaluate our methods, estimates and judgments.

In future periods, management will continue to reevaluate its estimates for contract margins, service agreements, loss accruals, warranty, performance guarantees, liquidated damages and inventory valuation allowances. Changes in those estimates and judgments could significantly affect our results of operations and financial condition. We will also adopt changes required by the Financial Accounting Standards Board and the Securities and Exchange Commission (“SEC”).

### Our stock price has been and could remain volatile.

The market price for our common stock has been and may continue to be volatile and subject to extreme price and volume fluctuations in response to market and other factors, including the following, some of which are beyond our control:

- failure to meet commercialization milestones;
- failure to win contracts through competitive bidding processes;
- the loss of a major customer;
- variations in our quarterly operating results from the expectations of securities analysts or investors;
- downward revisions in securities analysts’ estimates or changes in general market conditions;
- changes in the securities analysts that cover us or failure to regularly publish reports;
- announcements of technological innovations or new products or services by us or our competitors;
- announcements by us or our competitors of significant acquisitions, strategic partnerships, joint ventures or capital commitments;
- additions or departures of key personnel;
- investor perception of our industry or our prospects;
- insider selling or buying;
- demand for our common stock;
- general technological or economic trends; and
- changes in United States or foreign political environment and the passage of laws, including, tax, environmental or other laws, affecting the product development business.

In the past, following periods of volatility in the market price of their stock, many companies have been the subject of securities class action litigation. If we became involved in securities class action litigation in the future, it could result in substantial costs and diversion of management’s attention and resources and could harm our stock price, business prospects, results of operations and financial condition.

***Provisions of Delaware and Connecticut law and of our certificate of incorporation and by-laws and our outstanding securities may make a takeover more difficult.***

Provisions in our certificate of incorporation and by-laws and in Delaware and Connecticut corporate law may make it difficult and expensive for a third-party to pursue a tender offer, change in control or takeover attempt that is opposed by our management and board of directors. In addition, certain provisions of the “Series 1 Preferred Shares, our Series B Preferred Stock (such shares, the “Series B Preferred Shares”), our Series C Convertible Preferred Stock (such shares, the “Series C Preferred Shares”), and our Series D Preferred Stock (such shares, the “Series D Preferred Shares”) could make it more difficult or more expensive for a third party to acquire us. Public stockholders who might desire to participate in such a transaction may not have an opportunity to do so. These anti-takeover provisions could substantially impede the ability of public stockholders to benefit from a change in control or change in our management and board of directors.

***Our amended and restated by-laws provide that the Court of Chancery of the State of Delaware is the exclusive forum for substantially all disputes between us and our stockholders, which could limit our stockholders’ ability to obtain a judicial forum deemed favorable by the stockholder for disputes with us or our directors, officers or employees.***

Our amended and restated by-laws provide that the Court of Chancery of the State of Delaware is the exclusive forum for any derivative action or proceeding brought on our behalf, any action asserting a breach of fiduciary duty, any action asserting a claim against us arising pursuant to the Delaware General Corporation Law, our certificate of incorporation or our amended and restated by-laws, any action to interpret, apply, enforce, or determine the validity of our certificate of incorporation or amended and restated by-laws, or any action asserting a claim against us that is governed by the internal affairs doctrine. The choice of forum provision may limit a stockholder’s ability to bring a claim in a judicial forum that the stockholder finds favorable for disputes against us or our directors, officers or other employees, which may discourage such lawsuits against us and our directors, officers and other employees. Alternatively, if a court were to find the choice of forum provision contained in our amended and restated by-laws to be inapplicable or unenforceable in an action, we may incur additional costs associated with resolving such action in other jurisdictions, which could adversely affect our business and financial condition.

***The implementation of our business plan and strategy will require additional capital.***

The implementation of our business plan and strategy requires additional capital. If we are unable to raise additional capital in the amounts required, or at all, we will not be able to successfully implement our business plan and strategy. There can be no guarantee that we will be able to raise such additional capital at the times required or in the amounts required for the implementation of our business plan and strategy. In addition, the recent change to a more capital-intensive business model increases the risks of our being able to successfully implement our plans, if we do not raise additional capital in the amounts required. If we are unable to raise additional capital, our business, operations and prospects could be materially and adversely affected.

***We will need to raise additional capital, and such capital may not be available on acceptable terms, if at all. If we do raise additional capital utilizing equity, existing stockholders will suffer dilution. If we do not raise additional capital, our business could fail or be materially and adversely affected.***

We will need to raise additional funds in debt and equity financings, and these funds may not be available to us when we need them or on acceptable terms, if at all. Such additional financings could be significant. If we raise additional funds through further issuances of our common stock, or securities convertible or exchangeable into shares of our common stock, into the public market, including shares of our common stock issued upon exercise of options or warrants, you could suffer significant dilution, and any new equity securities we issue could have rights, preferences and privileges superior to those of our then-existing capital stock. Any debt financing secured by us in the future could involve restrictive covenants relating to our capital raising activities and other financial and operational matters, which may make it more difficult for us to obtain additional capital and to pursue business opportunities. If we cannot raise additional funds when we need them, our business and prospects could fail or be materially and adversely affected. In addition, if additional funds are not secured in the future, we will have to modify, reduce, defer or eliminate parts of our present and anticipated future projects.

***Future sales of substantial amounts of our common stock could affect the market price of our common stock.***

Future sales of substantial amounts of our common stock, or securities convertible or exchangeable into shares of our common stock, into the public market, including shares of our common stock issued upon exercise of options or warrants, or perceptions that those sales could occur, could adversely affect the prevailing market price of our common stock and our ability to raise capital in the future.

***We may be subject to actions for rescission or damages or other penalties in connection with certain sales of shares of our common stock in the open market.***

Between August 2005 and April 2017, we sold shares of our common stock pursuant to a series of “at-the-market” sales plans. The shares sold pursuant to these sales plans represented a portion of the shares registered by us pursuant to shelf registration statements we filed with the SEC during this time period. While we reported the actual shares sold and proceeds, net of fees, of sales made during each fiscal quarter pursuant to the sales plans in our annual and quarterly reports on Forms 10-K and 10-Q, we did not file or deliver prospectus supplements at the time of or prior to making these sales. Accordingly, these sales may not have been in compliance with applicable federal and/or state securities laws, and the purchasers of such shares may have rescission rights or claims for damages. In addition, to the extent that these sales were not in compliance with applicable federal and/or state securities laws, we may be subject to penalties imposed by the SEC and/or state securities agencies. We have reported these sales to the SEC, and in response to our report, the SEC has opened an informal investigation of these sales. If purchasers successfully seek rescission and/or damages, and/or the SEC and/or state securities agencies impose financial penalties on us which are not covered by insurance, we may not have sufficient resources to make the necessary payments, and any such claims, damages or penalties could have a material adverse effect on our stock price, business prospects, results of operations, and financial condition. Although we believe we would have defenses to such claims or actions if brought, we are unable to predict the likelihood of any claims or actions being brought against us, or the amount of any damages or financial penalties which could be sought against us, or the extent to which any such financial exposure would be covered by insurance.

***The rights of the Series 1 Preferred Shares and the Series B Preferred Stock could negatively impact our cash flows and could dilute the ownership interest of our stockholders.***

The terms of the Series 1 Preferred Shares issued by FCE Ltd. provide rights to the holder, Enbridge Inc. (“Enbridge”), which could negatively impact us.

The provisions of the Series 1 Preferred Shares require that FCE Ltd. make annual payments totaling Cdn. $1,250,000, including (i) annual dividend payments of Cdn. $500,000 and (ii) annual return of capital payments of Cdn. $750,000. These payments will end on December 31, 2020. Additional dividends accrue on cumulative unpaid dividends at a 1.25% quarterly rate, compounded quarterly, until payment thereof. On December 31, 2020, the amount of all accrued and unpaid dividends on the Series 1 Preferred Shares of Cdn. $21.1 million and the balance of the principal redemption price of Cdn. $4.4 million must be paid to the holders of the Series 1 Preferred Shares. FCE Ltd. has the option of making dividend payments in the form of common stock or cash under the terms of the Series 1 Preferred Shares.

We are also required to issue common stock to the holder of the Series 1 Preferred Shares if and when the holder exercises its conversion rights. The number of shares of common stock that we may issue upon conversion could be significant and dilutive to our existing stockholders. For example, assuming the holder of the Series 1 Preferred Shares exercises its conversion rights after July 31, 2020 and assuming our common stock price is $0.51 (our common stock closing price on January 31, 2019), and an exchange rate of U.S. $1.00 to Cdn. $1.31 (exchange rate on January 31, 2019) at the time of conversion, we would be required to issue approximately 6,983,844 shares of our common stock.

The terms of the Series B Preferred Stock also provide rights to their holders that could negatively impact us. Holders of the Series B Preferred Stock are entitled to receive cumulative dividends at the rate of $50 per share per year, payable either in cash or in shares of our common stock. To the extent the dividend is paid in shares, additional issuances could be dilutive to our existing stockholders and the sale of those shares could have a negative impact on the price of our common stock. A share of our Series B Preferred Stock may be converted at any time, at the option of the holder, into 7.0922 shares of our common stock (which is equivalent to an initial conversion price of $141 per share), plus cash in lieu of fractional shares. Furthermore, the conversion rate applicable to the Series B Preferred Stock is subject to additional adjustment upon the occurrence of certain events.

***Conversion of all of the Series D Preferred Shares is contingent upon stockholder approval.***

Pursuant to the requirements of Nasdaq Listing Rule 5635(d), the Series D Preferred Shares may not be converted or redeemed by payment of shares of our common stock if such conversion or redemption would cause us to issue a number of shares equal to 20% or more of our outstanding voting stock prior to the issuance of the Series D Preferred Shares, until our stockholders approve the issuance of the common stock underlying the Series D Preferred Shares. We have filed a proxy statement with the SEC for the purpose of having our stockholders vote on a proposal to approve such issuances. Our stockholders may reject the proposal, which would impact our ability to make payments in the form of common stock pursuant to the amortization provisions of the Series D Preferred Shares and would require us to make such payments in cash.

***We may not be able to make cash payments to redeem the Series C Preferred Shares and the Series D Preferred Shares.***

We have the obligation to make bimonthly redemption payments on the Series D Preferred Shares commencing on December 1, 2018. These mandatory redemption payments may each be made, at our option, in cash or in shares of our common stock or in a combination of cash and shares of our common stock, except that our right to make payment in shares of common stock is dependent upon our satisfying certain equity conditions, unless such conditions are waived by the holders of the Series D Preferred Shares. Among other things, these equity conditions include our continued listing on The Nasdaq Global Market or another permitted exchange and our stock maintaining certain minimum average prices and trading volumes during the applicable measurement period.

In addition, the Series D Preferred Shares may not be converted or redeemed by payment of shares of our common stock if such conversion or redemption would cause us to issue a number of shares equal to 20% or more of our outstanding voting stock prior to the issuance of the Series D Preferred Shares, until our stockholders approve the issuance of the common stock underlying the Series D Preferred Shares. If we cannot satisfy the equity conditions, or, if our stockholders do not approve the issuance of a number of shares equal to 20% or more of our outstanding voting stock as of the date of issuance of the Series D Preferred Shares, we will not be able to make or will be limited in our ability to make (as applicable) our bimonthly mandatory redemption payments in stock, and we would be forced to make such bimonthly payments in cash. We may not have sufficient cash resources at the applicable time to make those cash payments, or to make such cash payments in full. In addition, certain such cash payments may not be permitted under the terms of our existing or future indebtedness or may cause us to fail to satisfy financial maintenance covenants.

Further, any failure to pay any amounts due to the holders of the Series D Preferred Shares, as well as certain other “triggering events,” including, without limitation, our failure to timely deliver shares, our suspension of trading, our failure to keep reserved for issuance an adequate number of shares of common stock to cover conversion of the Series D Preferred Shares, and breaches of certain covenants that are not timely cured, where a cure period is permitted, would permit the holders of the Series D Preferred Shares to require us to redeem such Series D Preferred Shares, in cash at a price equal to the greater of (i) 125% of the stated value of the Series D Preferred Shares being redeemed, as the case may be, plus accrued dividends, if any, and (ii) the market value of the number of shares issuable on conversion of the Series D Preferred Shares valued at the greatest closing sales price during the period from the date immediately before the triggering event through the date we make the redemption payment. However, if we are actually delisted from The Nasdaq Global Market, without obtaining a listing on another national securities exchange, it would constitute a “triggering event” under the Series D Certificate of Designation and would also cause a failure of the equity conditions that must be satisfied in order for us to make redemptions payments in shares of our common stock. Thus, if we fail to maintain trading or listing, as applicable, or if for any other reason we are required to repurchase the Series D Preferred Shares in cash prior to maturity, no assurance can be given that we would have the cash or financial resources available to us to make such a payment (or that we would be permitted to make such a payment under the terms of our indebtedness), and such an acceleration could have a material adverse effect on our business, results of operations and financial condition.

Under the Waiver Agreement, the holder of Series C Preferred Shares has waived its right to demand, require or otherwise receive payment, in cash, of any amount due and payable under the Series C Certificate of Designations. However, such waiver terminates upon the occurrence of a breach of the Waiver Agreement (following a five trading day cure period), the occurrence of a bankruptcy triggering event or a fundamental transaction (in each case as defined in the Series C Certificate of Designations), or the occurrence of certain other triggering events, including our failure to deliver freely tradable shares of common stock upon conversion of the Series C Preferred Shares, our suspension from trading, and our failure to timely deliver shares. Upon such an event, the holders of the Series C Preferred Shares may require us to redeem the Series C Preferred Shares, in cash, at a price equal to the greater of (i) 125% of the stated value of the Series C Preferred Shares being redeemed, plus accrued dividends, if any, and (ii) the market value of the number of shares issuable on conversion of the Series C Preferred Shares valued at the greatest closing sales price during the period from the date immediately before the triggering event through the date we make the redemption payment. If we were required to redeem the Series C Preferred Shares, no assurance can be given that we would have the cash or financial resources available to us to make such a payment (or that we would be permitted to make such a payment under the terms of our indebtedness), and such a redemption could have a material adverse effect on our business, results of operations and financial condition.

***The Series B Preferred Stock, Series C Preferred Shares and Series D Preferred Shares rank senior to our common stock with respect to payments upon liquidation, dividends, and distributions.***

The rights of the holders of the Series B Preferred Stock, Series C Preferred Shares and Series D Preferred Shares rank senior to the obligations to our common stockholders. Upon our liquidation, the holders of Series B Preferred Stock are entitled to receive $1,000.00 per share plus all accumulated and unpaid dividends. Until the holders of Series B Preferred Stock receive their Liquidation Preference in full, no payment will be made on any junior shares, including our Series C Preferred Shares, our Series D Preferred Shares, and shares of our common stock. Upon our liquidation, the holders of Series C Preferred Shares are entitled to receive an amount per Series C Preferred Share equal to the greater of (A) the stated value thereof on the date of such payment, plus accrued dividends, if any and (B) the amount per share such holder would receive if such holder converted such Series C Preferred Shares into common stock immediately prior to the date of such payment. Upon our liquidation, the holders of Series D Preferred Shares are entitled to receive an amount per Series D Preferred Share equal to the greater of (A) the stated value thereof on the date of such payment, plus accrued dividends, if any and (B) the amount per share such holder would receive if such holder converted such Series D Preferred Shares into common stock immediately prior to the date of such payment. Further, the holders of Series C Preferred Shares and Series D Preferred Shares have the right to participate in any payment of dividends or other distributions made to the holders of common stock to the same extent as if they had converted such preferred shares. The existence of senior securities such as the Series B Preferred Stock, Series C Preferred Shares and Series D Preferred Shares could have an adverse effect on the value of our common stock.

***Holders of the Series C Preferred Shares and Series D Preferred Shares have rights that may restrict our ability to operate our business.***

Under the Series C Certificate of Designation and Series D Certificate of Designation, we are subject to certain covenants that limit our ability to create new series of preferred stock, other than series junior to the Series C Preferred Shares and Series D Preferred Shares with redemption occurring after the maturity date of the Series C Preferred Shares and Series D Preferred Shares, and our ability to incur certain indebtedness. Such restrictions may have an adverse effect on our ability to operate our business while the Series C Preferred Shares and Series D Preferred Shares are outstanding.

***Our common stockholders may experience significant dilution upon the issuance of common stock upon conversion of or redemption payments under the Series C Preferred Shares and Series D Preferred Shares.***

The issuance of common stock as mandatory redemption payments or upon conversion of some or all of the Series C Preferred Shares and/or Series D Preferred Shares will dilute the ownership interests of existing holders of shares of our common stock. As of January 31, 2019, the aggregate outstanding liquidation preference of the Series C Preferred Shares totaled $7.5 million. If this amount was converted into our common stock at the adjusted conversion price in effect as of January 31, 2019 of $0.43, we would have issued 17,211,968 shares of common stock upon conversion (without giving effect to any limitation on conversions). This excludes the effect of any common stock we may issue in lieu of paying bimonthly redemption amounts in cash, which may be made at a price lower than the conversion price. The conversion price of the Series C Preferred Shares is adjustable in the event we effect a stock split, combination or similar transaction, to reflect the proportionate (adjusted) trading prices of our common stock before and after the effective date, and is subject to adjustment as described in the Waiver Agreement.

As of January 31, 2019, the aggregate outstanding liquidation preference of the Series D Preferred Shares totaled $25.4 million. If this amount was converted into our common stock at its initial conversion price, we would have issued 18,424,965 shares of common stock upon conversion (without giving effect to any limitation on conversions). This excludes the effect of any common stock we may issue in lieu of paying bimonthly redemption amounts in cash, which may be made at a price lower than the initial conversion price. The initial conversion price of the Series D Preferred Shares is adjustable based on certain events, including in the event of a triggering event (as defined in the Series D Certificate of Designation), in the event we effect a stock split, combination or similar transaction, to reflect the proportionate (adjusted) trading prices of our common stock before and after the effective date, in the event we issue shares pursuant to our Sales Agreement with B. Riley FBR, Inc. and Oppenheimer & Co., Inc. dated June 13, 2018, and in the event we issue any securities that are deemed variable price securities (as defined in the Series D Certificate of Designation).

***If we do not meet the continued listing standards of The Nasdaq Global Market, our common stock could be delisted from trading, which could limit investors’ ability to make transactions in our common stock and subject us to additional trading restrictions.***

Our common stock is listed on The Nasdaq Global Market, which imposes continued listing requirements with respect to listed shares. On November 28, 2018, we received a letter from The Nasdaq Stock Market (“Nasdaq”) stating that we are not in compliance with Nasdaq Listing Rule 5450(a)(1) because the closing bid price of our common stock was below the required minimum of $1.00 per share for the previous 30 consecutive business days. In accordance with Nasdaq Listing Rules, we have a period of 180 calendar days, or until May 28, 2019, to regain compliance with the minimum bid price requirement. If at any time before May 28, 2019 the closing bid price of our common stock is at least $1.00 per share for a minimum of 10 consecutive business days, Nasdaq will provide us with written confirmation that we have regained compliance with the minimum bid price requirement and this matter will be closed. We have notified Nasdaq of our intention to regain compliance with the Nasdaq minimum bid price requirement. If we are unable to demonstrate compliance with Rule 5450(a)(1) by May 28, 2019, we can submit an application to transfer our securities to The Nasdaq Capital Market and request an additional 180-day period to regain compliance with the minimum bid price requirement.

There can be no assurance, however, that we will be able to regain compliance with the minimum bid price requirement or that we will otherwise be in compliance with other Nasdaq listing criteria. If we fail to regain and maintain compliance with the minimum bid requirement or to meet the other applicable continued listing requirements in the future and Nasdaq determines to delist our common stock, the delisting could adversely affect the market price and liquidity of our common stock, reduce our ability to raise additional capital, and result in a triggering event under the Series C Certificate of Designations and the Series D Certificate of Designation.

Filed Mar 7, 2019.