## Figures reported in this filing

Standardized XBRL line items for the period ended 2019-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Interest expense | 3 months, 2019-01-01 to 2019-03-31 | $55.0k | us-gaap:InterestExpense |
| Interest expense | 9 months, 2018-07-01 to 2019-03-31 | $210.0k | us-gaap:InterestExpense |
| Net income | 3 months, 2019-01-01 to 2019-03-31 | −$1.5m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2018-07-01 to 2019-03-31 | −$5.7m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2019-01-01 to 2019-03-31 | $0.01 | us-gaap:EarningsPerShareBasicAndDiluted |
| Diluted EPS | 9 months, 2018-07-01 to 2019-03-31 | $0.03 | us-gaap:EarningsPerShareBasicAndDiluted |
| Operating cash flow | 9 months, 2018-07-01 to 2019-03-31 | −$3.1m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | at 2019-03-31 | $126.0k | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2019-03-31 | $888.0k | us-gaap:AssetsCurrent |
| Total assets | at 2019-03-31 | $11.5m | us-gaap:Assets |
| Current liabilities | at 2019-03-31 | $5.4m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2019-03-31 | $7.6m | us-gaap:Liabilities |
| Shareholders' equity | at 2019-03-31 | $4.0m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 52,570 characters.

*The following discussion and analysis should be read in conjunction with our unaudited condensed interim consolidated financial statements as of, and for the three and nine months ended March 31, 2019, and the related notes thereto, which have been prepared in accordance with generally accepted accounting principles in the United States (“US GAAP”). This discussion and analysis contains forward-looking statements and forward-looking information that involve risks, uncertainties, and assumptions. Our actual results may differ materially from those anticipated in these forward-looking statements and information as a result of many factors, including, but not limited to, those set forth elsewhere in this Quarterly Report on Form 10-Q. See “Note Regarding Forward-Looking Statements” below.*

*All currency amounts are stated in thousands of U.S. dollars unless noted otherwise.*

*As used in this report, unless the context otherwise indicates, references to “we,” “our,” the “Company,” “NioCorp,” and “us” refer to NioCorp Developments Ltd. and its subsidiaries, collectively.*

### Note Regarding Forward Looking Statements

This Quarterly Report on Form 10-Q and the exhibits attached hereto contain “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), and “forward-looking information” within the meaning of applicable Canadian securities legislation (collectively, “forward-looking statements”). Such forward-looking statements concern our anticipated results and developments in the operations of the Company in future periods, planned exploration activities, the adequacy of the Company’s financial resources, and other events or conditions that may occur in the future. Forward-looking statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,” “intends,” “estimates,” “potential,” “possible,” and similar expressions, or statements that events, conditions, or results “will,” “may,” “could,” or “should” (or the negative and grammatical variations of any of these terms) occur or be achieved. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect,” “is expected,” “anticipates” or “does not anticipate,” “plans,” “estimates,” or “intends,” or stating that certain actions, events, or results “may,” “could,” “would,” “might,” or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. Such forward-looking statements reflect the Company’s current views with respect to future events and are subject to certain known and unknown risks, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to be materially different from any future results, performance, or achievements that may be expressed or implied by such forward-looking statements, including, among others, risks related to the following:

- risks related to our ability to operate as a going concern;
- risks related to our requirement of significant additional capital;
- risks related to our limited operating history;
- risks related to changes in economic valuations of the Elk Creek Project, such as net present value (“NPV”) calculations, changes, or disruptions in the securities markets;
- risks related to our history of losses;
- risks related to cost increases for our exploration and, if warranted, development projects;
- risks related to feasibility study results;
- risks related to the determination of the economic viability of a deposit;
- risks related to mineral exploration and production activities;
- risks related to our lack of mineral production from our properties;
- risks related to the results of our metallurgical testing;
- risks related to the price volatility of commodities;
- risks related to estimates of mineral resources and reserves;
- risks related to changes in mineral resource and reserve estimates;
- risks related to differences in United States and Canadian reserve and resource reporting;
- risks related to our exploration activities being unsuccessful;
- risks related to our ability to obtain permits and licenses for production;
- risks related to government and environmental regulations that may increase our costs of doing business or restrict our operations;
- risks related to proposed legislation that may significantly affect the mining industry;
- risks related to land reclamation requirements;
- risks related to competition in the mining industry;
- risks related to the difficulties of handling the disposal of mine water at our Elk Creek Project;
- risks related to equipment and supply shortages;
- risks related to current and future joint ventures and partnerships;
- risks related to our ability to attract qualified management;
- risks related to the ability to enforce judgment against certain of our Directors;
- risks related to currency fluctuations;
- risks related to claims on the title to our properties;
- risks related to surface access on our properties;
- risks related to potential future litigation;
- risks related to our lack of insurance covering all our operations;
- risks related to covenants contained in agreements with our secured creditors that may affect our assets;
- risks related to the extent to which our level of indebtedness may impair our ability to obtain additional financing;
- risks related to our status as a “passive foreign investment company” under the United States Internal Revenue Code of 1986, as amended;
- risks related to the Common Shares, including price volatility, lack of dividend payments, dilution, and penny stock rules; and
- risks related to our debt.

Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described herein. This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements. Forward-looking statements are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties, and other factors, including without limitation those discussed under the heading “Risk Factors” of our Annual Report on Form 10-K for the fiscal year ended June 30, 2018, as well as other factors described elsewhere in this report and the Company’s other reports filed with the Securities and Exchange Commission (“SEC”).

The Company’s forward-looking statements contained in this Quarterly Report on Form 10-Q are based on the beliefs, expectations, and opinions of management as of the date of this report. The Company does not assume any obligation to update forward-looking statements if circumstances or management’s beliefs, expectations, or opinions should change, except as required by law. For the reasons set forth above, investors should not attribute undue certainty to, or place undue reliance on, forward-looking statements.

### National Instrument 43-101 Compliance

Mr. Jean-Francois St-Onge, P.Eng, and Mr. Glen Kuntz, P. Geo, both of whom are independent Qualified Persons as defined in NI 43-101, have reviewed and approved the mineral reserves and mineral resources, respectively, and have verified the data contained in those portions of the Elk Creek Project disclosures relevant to their area of responsibility included in this Quarterly Report on Form 10-Q related to the updated NI 43-101 Feasibility Study (the “2019 Feasibility Study”).

Scott Honan, M.Sc., SME-RM, a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”), has supervised the preparation of the scientific and technical information that forms the basis for the Elk Creek Project disclosure in this Quarterly Report on Form 10-Q and has approved the disclosure in this Quarterly Report on Form 10-Q related thereto. Mr. Honan is not independent of the Company, as he is the Vice President, Business Development. Additional information on the updated 2019 Feasibility Study is available in our April 16, 2019 press release, which is available on the Company’s website. The full NI 43-101 Technical Report, incorporating the results of the 2019 Feasibility Study, is expected to be filed on SEDAR and our corporate website by May 31, 2019.

### Company Overview

NioCorp is developing the Elk Creek Project, located in southeast Nebraska. The Elk Creek Project is an advanced Niobium (“Nb”)/Scandium (“Sc”)/Titanium (“Ti”) exploration project. Niobium is used to produce various superalloys that are extensively used in high performance aircraft and jet turbines. It also is used in High-Strength, Low-Alloy (“HSLA”) steel, a stronger steel used in automotive, bridges, structural systems, buildings, pipelines, and other applications that generally reduces the weight of those applications, which can result in environmental benefits, including reduced fuel consumption and material usage and fewer air emissions. Scandium can be combined with aluminum to make high-performance alloys with increased strength and improved corrosion resistance. Scandium also is a critical component of advanced solid oxide fuel cells, an environmentally preferred technology for high-reliability, distributed electricity generation. Titanium is a component of various superalloys and other applications that are used for aerospace applications, weapons systems, protective armor, medical implants and many others. It also is used in pigments for paper, paint, and plastics.

Our primary business strategy is to advance our Elk Creek Project to commercial production. We are focused on obtaining additional funds to carry out our near-term planned work programs associated with securing the project financing necessary to complete mine development and construction of the Elk Creek Project.

### Emerging Growth Company Status

We qualify as an “emerging growth company” as defined in Section 101 of the Jumpstart our Business Startups Act (“JOBS Act”) as we do not have more than $1.07 billion in annual gross revenue and did not have such amount as of June 30, 2018, this being the last day of our most recently completed fiscal year.

We may lose our status as an emerging growth company on the last day of our fiscal year during which (i) our annual gross revenue exceeds $1.07 billion or (ii) we issue more than $1.07 billion in non-convertible debt in a three-year period. We will lose our status as an emerging growth company if at any time we are deemed to be a large accelerated filer, as defined in Rule 405 under the Exchange Act. We will lose our status as an emerging growth company on the last day of our fiscal year following the fifth anniversary of the date of our first sale of Common Shares pursuant to an effective registration statement.

As an emerging growth company under the JOBS Act, we have elected to opt out of the extended transition period for complying with new or revised standards pursuant to Section 107(b) of the JOBS Act. The election is irrevocable.

As an emerging growth company, we are exempt from Section 404(b) of the Sarbanes-Oxley Act of 2002 and Section 14A(a) and (b) of the Exchange Act. Such sections are described below:

- Section 404(b) of the Sarbanes-Oxley Act of 2002 requires a public company’s auditor to attest to, and report on, management’s assessment of its internal controls.
- Sections 14A(a) and (b) of the Exchange Act, implemented by Section 951 of the Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010 (the “Dodd-Frank Act”) Act, require companies to hold shareholder advisory votes on executive compensation and golden parachute compensation.

As long as we qualify as an emerging growth company, we will not be required to comply with the requirements of Section 404(b) of the Sarbanes-Oxley Act of 2002 and Section 14A (a) and (b) of the Exchange Act.

### Recent Corporate Events

On April 29, 2019, the Company closed the first tranche (the “First Tranche Closing”) of a non-brokered private placement (the “April 2019 Private Placement”) of Units of the Company. In connection with the First Tranche Closing, a total of 1,666,664 Units were issued at a price per Unit of C$0.60, for total gross proceeds to the Company of approximately C$1 million. On May 9, 2019, the Company closed the second and final tranche of the April 2019 Private Placement (the “Second Tranche Closing”) and a total of 1,290,500 Units were issued at a price per Unit of C$0.60, for total gross proceeds to the Company of approximately C$0.8 million.

Each Unit issued pursuant to the April 2019 Private Placement consisted of one Common Share and one-half of one Common Share purchase Warrant. Each full Warrant entitles the holder thereof to purchase one additional Common Share at a price of C$0.72 for a period of two years from their date of issuance. Proceeds from the April 2019 Private Placement will be used for working capital and general corporate purposes.

### Elk Creek Project Update

During the first quarter of fiscal year 2019, we received a new proposed design for the underground portion of the Elk Creek Project (the “mine design”) based on detailed underground engineering conducted by the Nordmin Group of Companies (“Nordmin”). During the quarter ended March 31, 2019, we completed our review and analysis of the mine design recommendations submitted by Nordmin and on April 16, 2019, we announced the results of the updated underground mine design and supporting infrastructure, the results of an update to the Elk Creek Project’s mineral resources and mineral reserve estimate, and the 2019 Feasibility Study based on the new mine design. A full NI 43-101 Technical Report, incorporating the results of the 2019 Feasibility Study, is expected to be filed by May 31, 2019.

Primary changes reflected in the updated mine design include a longer mine life, mining at greater depths to target higher niobium grades in the early years of mining operations, utilizing artificial ground freezing methods to mitigate water inflow during shaft construction, eliminating the active dewatering system consisting of up to 15 large dewatering wells and replacing a ventilation raise system with a ventilation shaft sinking method. In addition, the new mine design contemplates treating all water produced during mining operations, and water used in ore processing, on site for use in operations and replacing a brackish water discharge system with a system that produces solid salt that would be impounded on site.

#### Summary of Key Evaluation Metrics and Projected Economic Results Included in the 2019 Feasibility Study

The 2019 Feasibility Study financial model is based upon a mine life of 36 years with an annual steady state ore throughput rate of 1,009,000 metric tonnes (“mt”). When in operation, the Elk Creek Project is expected to be the sole U.S producer of Scandium trioxide (“Sc2O3”) and a commercial version of Nb, known as Ferroniobium (“FeNb”), and one of only a handful of producers in the world of these critical and strategic materials. Overall, according to the 2019 Feasibility Study, the Elk Creek Project is estimated to generate $20.8 billion in gross life of mine (“LoM”) revenue and $370 million in averaged annual earnings before interest, taxes, depreciation, and amortization (“EBITDA”) over its operating life. The table below summarizes and compares key financial and operational metrics of the 2019 Feasibility Study findings against the results of our previously released 2017 Feasibility Study.

*Elk Creek Project Comparison of Selected Metrics and Results*

*Financial Metrics*

| Description | Feasibility Study 2017 | 2019 | Change |
| --- | ---: | ---: | ---: |
| Pre-Tax NPV (8% discount) | $2,291 | $2,564 | 12.0% |
| Pre-Tax Internal Rate of Return (“IRR”) | 24.3% | 27.3% | 12.4% |
| After-Tax NPV | $1,666 | $2,098 | 25.9% |
| After-Tax IRR | 21.7% | 25.8% | 18.9% |
| After-tax payback period from production onset (years) | 3.68 | 2.86 | (22.3)% |
| Net pre-production Capital Expenditures (“CAPEX”) | $1,008 | $879 | (12.8)% |
| Mine Life (years) | 32.0 | 36.0 | 12.5% |
| LoM Gross Revenue | $17,906 | $20,807 | 16.2% |
| Nb | $5,695 | $7,860 | 38.0% |
| Sc | $11,896 | $12,532 | 5.4% |
| Ti | $316 | $414 | 31.3% |

17

*Elk Creek Project Comparison of Selected Metrics and Results*

| Description | Feasibility Study 2017 | 2019 | Change |
| --- | ---: | ---: | ---: |
| Averaged Annual EBITDA1 over LoM | $370 | $370 | — |
| Averaged EBITDA 1 Margin (EBITDA as % of total revenue) | 69% | 67% | (3.4)% |
| LoM Operating Expenditures (“OPEX”) ($/mt) | $179.99 | $196.41 | 9.1% |
| Effective Tax Rate | 24.1% | 17.5% | (27.3)% |
| Operational Metrics |  |  |  |
| Ore Mined (kilotonnes (“kt”)) | 31,661 | 36,313 | 14.7% |
| Mining Rate (mt/day) | 2,762 | 2,764 | 0.1% |
| Niobium pentoxide (“Nb2O5”) Grade | 0.79% | 0.81% | 2.3% |
| Sc Grade (grams/mt) | 71.58 | 65.71 | (8.2)% |
| Titanium dioxide (“TiO2”) Grade | 2.81% | 2.86% | 1.9% |
| Processing Rate (kt/year) | 1,009 | 1,009 | — |
| Average Recovery Nb2O5 | 82.4% | 82.4% | — |
| Average Recovery Sc | 93.1% | 93.1% | — |
| Average Recovery TiO2 | 40.3% | 40.3% | — |
| Realized Product Prices: |  |  |  |
| Nb ($/kilogram (“kg”), Nb as FeNb) | $39.60 | $46.55 | 17.5% |
| Sc2O3 ($/kg as Sc2O3) | $3,675 | $3,676 | 0.0% |
| TiO2 ($/kg as TiO2) | $0.88 | $0.99 | 12.4% |
| Payable Metal: |  |  |  |
| Nb (mt) | 143,824 | 168,861 | 17.4% |
| Sc2O3 (mt) | 3,237 | 3,410 | 5.3% |
| TiO2 (mt) | 359,128 | 418,841 | 16.6% |

Totals may not sum due to rounding.

#### CAPEX Estimates Included in the 2019 Feasibility Study

According to the 2019 Feasibility Study, total upfront CAPEX for the Elk Creek Project is $1.14 billion, a 5.1% increase over the 2017 Feasibility Study and which reflects the following: additional and larger water treatment equipment; higher costs due to inflation between 2017 and 2019; replacing a ventilation raise system with a ventilation shaft sinking method using proven artificial ground freezing methods to mitigate water inflow risks for this requirement; and higher capital costs incurred by initially mining at greater depths where ore grades are higher. In the 2019 Feasibility Study, net pre-production CAPEX is $879 million, which includes a contingency of 10.33%2 and a pre-production net revenue credit of $265 million, which is generated during a six-month production ramp-up period (versus a three-month ramp-up in the 2017 Feasibility Study) and is net of pre-production capital and operational costs.

*Elk Creek Project Comparison of Capital Expenditure Estimates*

| Description Direct Costs | Feasibility Study 2017 | 2019 | Change |
| --- | ---: | ---: | ---: |
| Preproduction CAPEX | $71.0 | $83.0 | 16.2% |
| Mining CAPEX | 179.0 | 257.0 | 44% |
| Processing CAPEX (excluding water treatment) | 343.0 | 367.0 | 7.1% |

1 See “Non-GAAP Financial Performance Measures” below for a discussion of the use of non-GAAP financial measures.

2 Project contingency percentage is calculated on all features of the project excluding the water treatment plant, which is quoted on a design-build-operate basis and incorporates its own contingency.

*Elk Creek Project Comparison of Capital Expenditure Estimates*

| Description | Feasibility Study 2017 | 2019 | Change |
| --- | ---: | ---: | ---: |
| Water management CAPEX3 | 100.0 | 6.0 | (94)% |
| Water Treatment4 | 24.0 | 68.0 | 180% |
| Tailings | 20.2 | 21.4 | 6.1% |
| Site preparation | 30.6 | 40.6 | 2.6% |
| Indirect Expenses |  |  |  |
| Mining | 21.9 | 23.7 | 8.1% |
| Mining Engineering, Procurement and Construction (“EPC”) | 12.3 | 16.0 | 30% |
| Processing | 34.1 | 33.4 | (1.8)% |
| Processing EPC | 64.5 | 62.6 | (2.9)% |
| Site | 7.2 | 7.4 | 2.7% |
| Water management5 | 10.8 | 8.5 | (20.8)% |
| Owners Costs | 38.4 | 33.6 | (12.4)% |
| Commissioning |  |  |  |
| Mining | 0.7 | 1.4 | 102% |
| Processing | 13.0 | 13.3 | 2.7% |
| Contingency | 109.0 | 101.0 | (7.3)% |
| Sub Total | $1,088.0 | $1,143.0 | 5.1% |
| Net Pre-Production Revenue | (79.0) | (265.0) | 234% |
| TOTAL | $1,008.0 | $879.0 | (12.9)% |

Totals may not sum due to rounding.

#### OPEX Estimates Included in the 2019 Feasibility Study

The following table summarizes our expected LoM OPEX according to the 2019 Feasibility Study. The 2019 Feasibility Study OPEX is higher than the 2017 Feasibility Study OPEX as a result of several factors, including but not limited to the following: (1) under the new mine design, we intend to use a contract mining model as opposed to performing mining operations ourselves; (2) prices for some consumables used in surface processing facilities are higher than quotes received in 2017; and (3) under the new mine design, water management costs for the Elk Creek Project are higher as a result of the more intensive water treatment.

*Elk Creek Project Comparison of Operating Expenditure Estimates*

| LoM Operating Costs | Feasibility Study 2017 LoM Costs | Cost / mt (US dollars) | 2019 LoM Costs | Cost / mt (US dollars) |
| --- | ---: | ---: | ---: | ---: |
| Mining Costs | $1,244 | $39.30 | $1,563 | $43.04 |
| Processing Costs | 3,285 | 103.77 | 3,875 | 106.70 |
| Water Management & Infra | 251 | 7.92 | 609 | 16.78 |
| Tailings Management | 46 | 1.44 | 72 | 1.99 |
| Other Infrastructure | 212 | 6.68 | 199 | 5.47 |
| General and Administrative | 268 | 8.47 | 301 | 8.29 |
| Other Expenses | 136 | 4.31 | 229 | 6.30 |
| Subtotal OPEX | $5,442 | $171.89 | $6,847 | $188.56 |
| Royalties/Annual Bond Premium | 257 | 8.10 | 285 | 7.84 |
| Total All-In OPEX | $5,699 | $179.99 | $7,132 | $196.41 |

Totals may not sum due to rounding.

3 Water management CAPEX of $100 million in the 2017 Feasibility Study were primarily attributable to the cost of constructing the then-planned waterline to the Missouri River and costs associated with pre-production dewatering wells and hydrogeological investigations. For 2019, water management CAPEX encompasses hydrogeological investigations.

4 Water treatment includes direct costs of the Project’s water treatment systems.

5 Indirect expenses for water management in the 2017 Feasibility Study included hydrogeologic investigations and installation and testing of prototype water pumping wells. For 2019, these costs encompass the indirect costs of building the Project’s water treatment facility.

In the 2019 Feasibility Study, the financial performance estimation and valuation of the Elk Creek Project were conducted using a discounted cash flow methodology over its 36-year mine life and an 8% discount rate.

#### Elk Creek Project Environmental Performance under New Mine Design Included in the 2019 Feasibility Study

The new mine design further reinforces the environmental performance of the Elk Creek Project. Together with previously disclosed environmental and process innovations incorporated in the 2017 Feasibility Study, the new mine design now incorporates these following strategies and technologies designed to minimize environmental impacts of operation:

- Zero Process Liquid Discharge: The Elk Creek facility will now operate as a “Zero Process Liquid Discharge” facility, with no releases of process liquids. Instead, both naturally occurring, brackish (slightly salty) water produced during mining operations, and water used in ore processing, will be treated on site for use in operations. A solid salt will be produced from water treatment operations which will be stored on site.
- No Wastewater Discharge to the Missouri River: By treating water on site, the Elk Creek Project no longer needs to transport water for discharge into the Missouri River. This will release the Elk Creek Project from having to obtain a specific National Pollutant Discharge Elimination System water quality discharge permit from the State of Nebraska, or an additional Section 404 permit, or a Section 408 permit from the U.S. Army Corps of Engineers (“USACE”). The Section 408 permit would have required completion of an Environmental Assessment study, a process that is governed by the National Environmental Policy Act (“NEPA”) and involves review by multiple federal government agencies.
- Additional Protection of Groundwater Resources Through Artificial Ground Freezing: The Elk Creek Project’s new mine design will utilize artificial ground freezing as part of the process of sinking the production and ventilation shafts. Artificial ground freezing creates a temporary frozen barrier that helps to protect groundwater resources in the area while shaft-sinking operations are underway.
- Avoidance of Permanent Impacts to Federally Jurisdictional Waters: We designed the layout of the Elk Creek Project to minimize or avoid permanent impacts to any federally jurisdictional waters and/or wetlands on the property. This reduced the Elk Creek Project’s expected environmental impacts and allowed the Elk Creek Project to secure a Clean Water Act Section 404 permit from the USACE under the Nationwide Permit program, a much more efficient and less expensive process than an individual Section 404 permit. No other NEPA-level federal permits are now expected to be required for the Elk Creek Project.
- Recycling of Reagents Used in Mineral Processing: Metallurgical and process breakthroughs that we accomplished in 2016 and 2017 are expected to help reduce the volume of material planned for disposal in the Elk Creek Project’s tailings storage areas. As more of this material is recycled, the environmental footprint of the Elk Creek Project is reduced.
- Utilizing Tailings as Underground Mine Backfill: We plan to fill underground voids concurrently with mining operations using a paste backfill material that contains mine waste material that typically would be stored in above-ground mine tailings storage areas.

#### Mineral Resources and Mineral Reserves Estimates Included in the 2019 Feasibility Study

The 2019 Feasibility Study update included an update to the Elk Creek Project’s mineral resource and mineral reserve, as shown below.

*Elk Creek Project Mineral Resource Summary As of February 19, 2019*

| Classification | Cut-off NSR (DIL)(US$/mt) | Tonnage (x1000 mt) | Nb2O5 Grade (%) | Contained Nb2O5 (mt) | TiO2 Grade (%) | Contained TiO2 (mt) | Sc Grade (ppm) | Contained Sc (mt) |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Indicated | 180 | 183,185 | 0.54 | 981,092 | 2.15 | 3,940,419 | 57.65 | 10,562 |
| Inferred | 180 | 103,992 | 0.48 | 498,864 | 1.81 | 1,886,181 | 47.38 | 4,928 |

Source: Nordmin, 2019. All figures are rounded to reflect the relative accuracy of the estimates. Totals may not sum due to rounding.

| February 19, 2019 Mineral Resource Details Parameter | Value Unit |
| --- | ---: |
| Mining Cost | 50.0 US$/mt mined |
| Processing | 125 US$/mt mined |
| General and Administrative | 5.0 US$/mt mined |
| Total Cost | 180 US$/mt mined |
| Nb2O5 to Niobium conversion | 69.6% |
| Niobium Process Recovery | 82.36% |
| Niobium Price | 39.60 US$/kg |
| TiO2 Process Recovery | 40.31% |
| TiO2 Price | 0.88 US$/kg |
| Sc Process Recovery | 93.14% |
| Sc to Sc2O3 conversion | 153.4% |
| Sc Price | 3,675 US$/kg |
| Calculated CoG NSR diluted 6 % | 180 US$/mt |

- Mineral resources are reported inclusive of the mineral reserve. Mineral resources are not mineral reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate and have been used to derive sub-totals, totals and weighted averages. Such calculations inherently involve a degree of rounding and consequently introduce a margin of error. Where these occur, Nordmin does not consider them to be material.
- The reporting standard adopted for the reporting of the MRE uses the terminology, definitions and guidelines given in the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Standards on Mineral Resources and Mineral Reserves (May 10, 2014) as required by NI 43-101.
- CIM definition standards for mineral resources and mineral reserves (May 2014) defines a mineral resource as:
- “(A) concentration or occurrence of diamonds, natural solid inorganic material, or natural solid fossilized organic material including base and precious metals, coal, and industrial minerals in or on the Earth’s crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge”.
- Historical samples have been validated via re-assay programs, and all drilling completed by NioCorp has been subjected to QA/QC. All composites have been capped and then composited where appropriate, and estimates completed used ordinary kriging. The concession is wholly owned by and exploration is operated by NioCorp Developments Ltd.
- The project is amenable to underground longhole open stoping mining methods. Using results from metallurgical test work, suitable underground mining and processing costs, and forecast product pricing Nordmin has reported the mineral resource at an NSR cut-off of US$180/mt.
- Economic Assumptions Used to Define Mineral resource Cut-off Value:

Diluted NSR (US$) = Revenue per block Nb2O5 (diluted) + Revenue per block TiO2 (diluted) + Revenue per block Sc (diluted)

Diluted tonnes per block

- Price assumptions for FeNb, Sc2O3, and TiO2 are based upon independent market analyses for each product.
- Price and cost assumptions are based on the pricing of products at the “mine-gate”, with no additional down-stream costs required. The assumed products are a ferroniobium product (metallic alloy shots 0.65NbŸ0.35% Fe), a titanium dioxide product in powder form, and scandium trioxide in powder form.
- The “reasonable prospects for economic extraction” requirement generally implies that the quantity and grade estimates meet certain economic thresholds and that the mineral resources are reported at an appropriate Cut-off Grade (“**CoG”**), considering extraction scenarios and processing recoveries. Based on this requirement, Nordmin considers that major portions of the project are amenable for underground extraction with a processing method to recover FeNb (as the saleable product of Nb2O5), TiO2, and Sc2O3 products.
- The result of positive indications from the company’s metallurgical testing and development program, titanium (TiO2) and scandium (Sc) were added to the mineral resource Statement in February 2015. Both metals can be recovered with simple additions to the existing process flowsheet and would provide additional revenue streams that would complement the planned production of ferroniobium.
- Nordmin has provided reasonable estimates of the expected costs based on the knowledge of the style of mining (underground) and potential processing methods (by 3rd party Qualified Persons).
- Mineral Resource effective date February 19, 2019.
- Nordmin completed a site inspection of the deposit by Glen Kuntz, BSc, P.Geo., Consulting Specialist - Geology/Mining, an appropriate “independent qualified person” as this term is defined in NI 43-101.

*Elk Creek Project Mineral Reserve Summary As of February 19, 2019*

| Classification Proven | Tonnage (x1000 mt) | Nb2O5 Grade (%) | Contained Nb2O5 (mt) | Payable Nb (mt) | TiO2 Grade (%) | Contained TiO2 (mt) | Payable TiO2 (mt) | Sc Grade (ppm) | Contained Sc (mt) | Payable Sc2O3 (mt) |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Probable | 36,313 | 0.81 | 293,321 | 168,861 | 2.86 | 1,039,050 | 418,841 | 65.7 | 2,387 | 3,410 |
| Total Proven and Probable | 36,313 | 0.81 | 293,321 | 168,861 | 2.86 | 1,039,050 | 418,841 | 65.7 | 2,387 | 3,410 |

Source: Nordmin, 2019. All figures are rounded to reflect the relative accuracy of the estimates. Totals may not sum due to rounding.

| February 19, 2019 Mineral Reserve Details Parameter | Value Unit |
| --- | ---: |
| Mining Cost | 43.55 US$/mt mined |
| Processing | 108.16 US$/mt mined |
| Water Management and Infrastructure | 13.71 US$/mt mined |
| Tailings Management | 1.35 US$/mt mined |
| Other Infrastructure | 6.96 US$/mt mined |
| General and Administrative | 8.65 US$/mt mined |
| Royalties/Annual Bond Premium | 7.53 US$/mt mined |
| Total Cost | 189.91 US$/mt mined |
| Nb2O5 to Niobium conversion | 69.6% |
| Niobium Process Recovery | 82.36% |
| Niobium Price | 39.60 US$/kg |
| TiO2 Process Recovery | 40.31% |
| TiO2 Price | 0.88 US$/kg |
| Sc Process Recovery | 93.14% |
| Sc to Sc2O3 conversion | 153.4% |
| Sc Price | 3,675 US$/kg |

- Nordmin has reported the mineral reserve based on the mine design, mine plan, and cash-flow model utilizing an average cut-off grade of 0.788% NB2O5 with an NSR of $500/mt.
- Nordmin considers that the mineral reserve is amenable for underground extraction with a processing method to recover FeNb (as the saleable product of Nb2O5), TiO2, and Sc2O3 products.
- The economic assumptions used to define Mineral Reserve cut-off grade are as follows:
- Annual life of mine (LoM) production rate of ~7,220 tonnes of FeNb/annum,
- Initial elevated five-year production rate ~ 7,351 tonnes of FeNb/annum
- Mining dilution of ~6% was applied to all stopes and development, based on 3% for the primary stopes, 9% for the secondary stopes, and 5% for ore development.
- Mining recoveries of 95% were applied.
- Price assumptions for FeNb, Sc2O3, and TiO2 are based upon independent market analyses for each product.
- Price and cost assumptions are based on the pricing of products at the “mine-gate”, with no additional down-stream costs required. The assumed products are a ferroniobium product (metallic alloy shots 0.65NbŸ0.35% Fe), a titanium dioxide product in powder form, and scandium trioxide in powder form.
- The mineral reserve has an average LoM NSR of $538.63 /tonne.
- Nordmin has provided detailed estimates of the expected costs based on the knowledge of the style of mining (underground) and potential processing methods (by 3rd party Qualified Persons).
- Mineral Reserve effective date February 19, 2019. The financial model was run post-February 2019, which reflects a total cost of $196.41 versus $189.91 used in the February 19, 2019 Mineral Reserve Details Table above. Nordmin does not consider this a material change.
- Price variances for commodities is based on updated independent market studies versus earlier projected pricing. The updated independent market studies do not have a negative effect on the reserve.
- Nordmin completed a site inspection of the deposit through a subcontractor, Jean-Francois St-Onge, P.Eng, Associate Consulting Specialist - Mining, an appropriate “independent qualified person” as this term is defined in NI 43-101.

#### Other Activities

In addition to finalizing the mine design and releasing the 2019 Feasibility Study, we continued to advance other Elk Creek Project-related work during the quarter. Primary activities included:

- Continued development of an air construction permit (the “Air Permit”) application for the Nebraska Department of Environmental Quality, including the detailed engineering necessary to support the submission of the Air Permit application , which we expect to file in calendar year 2019; and
- Continued the competitive process to identify and select engineering, procurement and construction firms for surface development.

Our long-term financing efforts continued during the quarter ended March 31, 2019, and we expect to undertake the following planned activities to advance the Elk Creek Project through to the construction phase as funds become available through the Company’s fundraising efforts:

- File the updated NI-43-101 Technical Report for the Elk Creek Project on SEDAR by May 31, 2019.
- Secure project finance necessary to move the Elk Creek Project to construction and commercial operation.
- Submit a construction air permit application to the State of Nebraska, along with other permit applications that will be needed for construction.
- Make formal awards of EPC contracts.
- Continue detailed engineering for the Elk Creek Project’s mine and surface facilities.

### Financial and Operating Results

The Company continues to expense all expenditures when incurred, except for equipment, which is capitalized. The Company has no revenues from mining operations. Operating expenses incurred related primarily to performing exploration activities, as well as the activities necessary to support corporate and shareholder duties and are detailed in the following table.

| Operating expenses: | For the Three Months Ended March 31, 2019 | 2018 | For the Nine Months Ended March 31, 2019 | 2018 |
| --- | ---: | ---: | ---: | ---: |
| Employee-related costs | $552 | $410 | $1,267 | $1,809 |
| Professional fees | 71 | 150 | 216 | 543 |
| Exploration expenditures | 858 | 483 | 2,863 | 1,499 |
| Other operating expenses | 106 | 307 | 457 | 994 |
| Total operating expenses | 1,587 | 1,350 | 4,803 | 4,845 |
| Change in financial instrument fair value | - | 1,514 | 633 | 1,811 |
| Foreign exchange loss (gain) | (125) | 180 | 73 | (21) |
| Interest expense | 55 | 99 | 210 | 274 |
| (Gain) loss on available for sale securities | 2 | 3 | 4 | 10 |
| Income tax expense | - | - | - | - |
| Net Loss | $1,519 | $3,146 | $5,723 | $6,919 |

### Nine months ended March 31, 2019 compared to nine months ended March 31, 2018

Significant items affecting operating expenses are noted below:

*Employee-related costs* decreased due to decreased share-based compensation costs reflecting the timing of Option issuances and the corresponding vesting periods, as well as the number of Options granted and associated fair value calculations.

*Professional fees* include legal and accounting services. Overall, these fees decreased, reflecting the timing of legal fees associated with SEC filings and ongoing compliance efforts.

*Exploration expenditures* increased reflecting our ongoing efforts to evaluate the mine engineering design changes proposed by Nordmin and the related costs associated with developing the 2019 Feasibility Study as well as costs incurred to develop the detailed engineering necessary to support the submission of the Air Permit application.

*Other operating expenses* include investor relations, general office expenditures, equity offering and proxy expenditures and other miscellaneous costs. These costs decreased primarily due to the timing of Option issuances, the corresponding vesting periods, the number of Options granted, and associated fair value calculations for Board members, as well as the timing of financial and investor relations services.

Other significant items impacting the change in the Company’s net loss are noted below:

*Change in financial instrument fair value* represents non-cash changes in the market value of the Convertible Securities, which are carried at fair value, as well as changes in the market value of the derivative liability component of the Company’s outstanding convertible promissory notes, and the fair market value of Warrants issued in connection with the funding of the Original Convertible Security and the Subsequent Convertible Security. The 2018 loss includes the value of Warrants issued to Lind in connection with the Subsequent Convertible Security funding, as well as recognition of prepaid interest incurred on funding.

*Foreign exchange (gain) loss* is primarily due to changes in the U. S. dollar against the Canadian dollar and reflects the timing of foreign currency transactions and subsequent changes in exchange rates.

### Three months ended March 31, 2019 compared to three months ended March 31, 2018

Overall, the increase in net loss for the three months ended March 31, 2019 as compared to the same period in 2018 is the result of primarily the same factors underlying the six-month changes, as discussed above, with respect to professional fees, exploration expenditures, and foreign exchange (gain) loss. The increase in employee-related costs in 2019 as compared to 2018 is due to the timing of option amortization. The decrease in loss for changes in financial instrument fair values in 2019 as compared to 2018 relates to warrant expense associated with Lind fundings which occurred in 2018.

### Liquidity and Capital Resources

We have no revenue generating operations from which we can internally generate funds. To date, our ongoing operations have been financed by the sale of our equity securities by way of private placements, convertible securities issuances, and the exercise of incentive stock options and share purchase warrants. We believe that we will be able to secure additional private placement financings in the future, although we cannot predict the size or pricing of any such financings. In addition, we may raise funds through the sale of interests in our mineral properties, although current market conditions have substantially reduced the number of potential buyers/acquirers of any such interests.

As of March 31, 2019, the Company had cash of $0.1 million and a working capital deficit of $4.5 million, compared to cash of $0.1 million and working capital deficit of $3.4 million on June 30, 2018. Working capital deficit increased due to the timing of 2019 expenditures for the 2019 Feasibility Study work.

We expect that the Company will operate at a loss for the foreseeable future. The Company’s current planned operational needs are approximately $4.6 million until June 30, 2019 net of funds received from the recently completed April 2019 Private Placement. In addition to outstanding accounts payable and short-term liabilities, our average monthly expenditures are approximately $350 per month where approximately $270 is for corporate overhead and estimated costs related to securing financing necessary for advancement of the Elk Creek Project. Approximately $80 per month is planned for expenditures relating to the advancement of Elk Creek Project by NioCorp’s wholly-owned subsidiary, Elk Creek Resources Corp. The Company’s ability to continue operations and fund our current work plan is dependent on management’s ability to secure additional financing.

The Company anticipates that it may need to raise $7.7 million - $8.5 million to continue planned operations for the next twelve months focused on financing and detailed engineering efforts related to the Elk Creek Project. Management is actively pursuing such additional sources of debt and equity financing, and while it has been successful in doing so in the past, there can be no assurance it will be able to do so in the future.

Elk Creek property lease commitments are $16 until June 30, 2019. To maintain its currently held properties and fund its currently anticipated general and administrative costs and planned exploration and development activities at the Elk Creek Project for the fiscal year ending June 30, 2019, the Company will likely require additional financing during the current fiscal year. Should such financing not be available in that time-frame, we will be required to reduce our activities and will not be able to carry out all our presently planned activities at the Elk Creek Project.

We currently have no further funding commitments or arrangements for additional financing at this time (other than the potential exercise of Options and Warrants) and there is no assurance that we will be able to obtain additional financing on acceptable terms, if at all. On January 15, 2019, approximately 9.0 million outstanding warrants priced at C$0.75 expired unexercised. There is significant uncertainty that we will be able to secure any additional financing in the current equity or debt markets. The quantity of funds to be raised and the terms of any proposed equity or debt financing that may be undertaken will be negotiated by management as opportunities to raise funds arise. management intends to pursue funding sources of both debt and equity financing, including but not limited to the issuance of equity securities in the form of Common Shares, Warrants, subscription receipts, or any combination thereof in units of the Company pursuant to private placements to accredited investors or pursuant to equity lines of credit or public offerings in the form of underwritten/brokered offerings, at-the-market offerings, registered direct offerings, or other forms of equity financing and public or private issuances of debt securities including secured and unsecured convertible debt instruments or secured debt project financing. Management does not currently know the terms pursuant to which such financings may be completed in the future, but any such financings will be negotiated at arm’s-length. Future financings involving the issuance of equity securities or derivatives thereof will likely be completed at a discount to the then-current market price of the Company’s securities and will likely be dilutive to current shareholders.

The audit opinion and notes that accompany our financial statements for the year ended June 30, 2018 disclose a “going concern” qualification and disclosures to our ability to continue in business. The financial statements included in this Quarterly Report on Form 10-Q have been prepared under the assumption that we will continue as a going concern. We are an exploration stage company and we have incurred losses since our inception. We do not have sufficient cash to fund normal operations and meet debt obligations for the next twelve months without deferring payment on certain current liabilities and raising additional funds. We believe that the going concern condition cannot be removed with confidence until the Company has entered into a business climate where funding of its planned ongoing operating activities is secured.

We have no exposure to any asset-backed commercial paper. Other than cash held by our subsidiaries for their immediate operating needs in Colorado and Nebraska, all of our cash reserves are on deposit with major United States and Canadian chartered banks. We do not believe that the credit, liquidity, or market risks with respect thereto have increased as a result of the current market conditions. However, in order to achieve greater security for the preservation of our capital, we have, of necessity, been required to accept lower rates of interest, which has also lowered our potential interest income.

### Operating Activities

During the nine months ended March 31, 2019, the Company’s operating activities consumed $3.1 million of cash (2018: $4.6 million). The cash used in operating activities for 2019 reflects the Company’s funding of losses of $5.7 million, partially offset by share-based compensation charges and other non-cash transactions. Overall, 2019 operational outflows decreased slightly from 2018 as our expenditures related to updating underground mine engineering and developing the 2019 Feasibility Study were offset by an increase in accounts payable. Going forward, the Company’s working capital requirements are expected to increase substantially in connection the development of the Elk Creek Project.

### Financing Activities

Financing inflows were $3.2 million during the nine months ended March 31, 2019 as compared to $4.6 million during the corresponding period in 2018, primarily reflecting the timing of private placement issuances initiated during the comparative periods.

### Cash Flow Considerations

The Company has historically relied upon equity financings and, to a lesser degree, debt financings, to satisfy its capital requirements and will continue to depend heavily upon equity capital to finance its activities. The Company may pursue debt financing in the medium term if it is able to procure such financing on terms more favorable than available equity financing; however, there can be no assurance the Company will be able to obtain any required financing in the future on acceptable terms.

The Company has limited financial resources compared to its proposed expenditures, no source of operating income, and no assurance that additional funding will be available to it for current or future projects, although the Company has been successful in the past in financing its activities through the sale of equity securities.

The ability of the Company to arrange additional financing in the future will depend, in part, on the prevailing capital market conditions and its success in developing the Elk Creek Project. Any quoted market for the Common Shares may be subject to market trends generally, notwithstanding any potential success of the Company in creating revenue, cash flows, or earnings, and any depression of the trading price of the Common Shares could impact its ability to obtain equity financing on acceptable terms.

Historically, the Company has used net proceeds from issuances of Common Shares to provide sufficient funds to meet its near-term exploration and development plans and other contractual obligations when due. However, further development and construction of the Elk Creek Project will require substantial additional capital resources. This includes near-term funding and, ultimately, funding for Elk Creek Project construction and other costs. See “*Liquidity and Capital Resources”* above for the Company’s discussion of arrangements related to possible future financings.

### Contractual Obligations

There have been no material changes to our contractual obligations discussed in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” under the heading “Tabular Disclosure of Contractual Obligations” as of June 30, 2018, in our Annual Report on Form 10-K for the fiscal year ended June 30, 2018, other than the continued conversion of outstanding convertible Lind debt.

### Off Balance Sheet Arrangements

The Company has no off balance sheet arrangements.

### Critical Accounting Policies

There have been no material changes in our critical accounting policies discussed in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” under the heading “Critical Accounting Policies” as of June 30, 2018, in our Annual Report on Form 10-K for the fiscal year ended June 30, 2018.

### Certain U.S. Federal Income Tax Considerations

The Company has been a “passive foreign investment company” (“PFIC”) as defined under Section 1297 of the U.S. Internal Revenue Code of 1986, as amended, in recent years and expects to continue to be a PFIC in the future. Current and prospective United States shareholders should consult their tax advisors as to the tax consequences of PFIC classification and the U.S. federal tax treatment of PFICs. Additional information on this matter is included in the Company’s Annual Report on Form 10-K for the fiscal year ended June 30, 2018, under the heading “Risks Related to the Common Shares.”

### Non-GAAP Financial Performance Measures

Non-GAAP financial performance measures are intended to provide additional information only and do not have any standard meaning prescribed by US GAAP. These measures should not be considered in isolation or as a substitute for performance measures prepared in accordance with US GAAP.

The 2019 Feasibility Study uses non-GAAP financial performance measures, such as Averaged Annual EBITDA and Averaged EBITDA Margin, for purposes of projecting the economic results of the Elk Creek Project. We are unable to provide a reconciliation of these forward-looking non-GAAP measures to the most comparable US GAAP financial performance measures because certain information needed to reconcile those non-GAAP measures to the most comparable US GAAP financial performance measures is dependent on future events, some of which are outside the control of the Company, such as FeNb, Sc2O3 and TiO2 prices, interest rates and exchange rates. Moreover, estimating such US GAAP measures with the required precision necessary to provide a meaningful reconciliation is extremely difficult and could not be accomplished without unreasonable effort.

## Market risk

As filed, 1,247 characters.

#### Interest rate risk

The Company’s exposure to changes in market interest rates, relates primarily to the Company’s earned interest income on cash deposits and short-term investments. The Company maintains a balance between the liquidity of cash assets and the interest rate return thereon. The carrying amount of financial assets, net of any provisions for losses, represents the Company’s maximum exposure to credit risk.

#### Foreign currency exchange risk

The company incurs expenditures in both U. S. dollars and Canadian dollars. Canadian dollar expenditures are primarily related to certain Common Share-related costs and corporate professional services. As a result, currency exchange fluctuations may impact the costs of our operating activities. To reduce this risk, we maintain sufficient cash balances in Canadian dollars to fund expected near-term expenditures.

#### Commodity price risk

The Company is exposed to commodity price risk related to the elements associated with the Elk Creek Project. A significant decrease in the global demand for these elements may have a material adverse effect on our business. The Elk Creek Project is not in production, and the Company does not currently hold any commodity derivative positions.

## Controls and procedures

As filed, 2,013 characters.

### Disclosure Controls and Procedures

At the end of the period covered by this Quarterly Report on Form 10-Q for the quarter ended March 31, 2019, an evaluation was carried out under the supervision of and with the participation of our management, including the CEO and the Chief Financial Officer (“CFO”), of the effectiveness of the design and operations of our disclosure controls and procedures (as defined in Rule 13a-15(e) and Rule 15d-15(e) under the Exchange Act). Based on that evaluation, the CEO and the CFO have concluded that, as of the end of the period covered by this Quarterly Report, our disclosure controls and procedures were effective in ensuring that: (i) information required to be disclosed by us in reports that we file or submit to the SEC under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in applicable rules and forms and (ii) material information required to be disclosed in our reports filed under the Exchange Act is accumulated and communicated to management, including the CEO and the CFO, as appropriate, to allow for accurate and timely decisions regarding required disclosure.

Management does not expect that our disclosure controls and procedures will prevent all error and all fraud. The effectiveness of our or any system of disclosure controls and procedures, however well designed and operated, can provide only reasonable assurance that the objectives of the system will be met and is subject to certain limitations, including the exercise of judgment in designing, implementing and evaluating controls and procedures and the assumptions used in identifying the likelihood of future events.

### Changes in Internal Control over Financial Reporting

There have been no changes in the Company’s internal control over financial reporting during the three months ended March 31, 2019 that have materially affected, or are reasonably likely to materially affect, the Company’s internal controls over financial reporting.

## Risk factors

As filed, 164 characters.

There have been no changes to the risk factors set forth under the heading “Risk Factors” in our Annual Report on Form 10-K for the fiscal year ended June 30, 2018.