# United States Antimony Corp: Form 10-K for the period ended Dec 31, 2022

- Company: [United States Antimony Corp](/companies/uamy.md) (CIK 101538)
- Form: 10-K
- Filed: 2023-07-18
- Accepted by EDGAR: Jul 18, 2023, 09:01 ET
- Period: 2022-12-31
- Accession: 0001654954-23-009305
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/101538/000165495423009305/uamy_10k.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/101538/000165495423009305/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2022-12-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 12 months, 2022-01-01 to 2022-12-31 | $11.0m | us-gaap:Revenues |
| Cost of revenue | 12 months, 2022-01-01 to 2022-12-31 | $9.0m | us-gaap:CostOfRevenue |
| Gross profit | 12 months, 2022-01-01 to 2022-12-31 | $2.0m | us-gaap:GrossProfit |
| Operating income | 12 months, 2022-01-01 to 2022-12-31 | $348.2k | us-gaap:OperatingIncomeLoss |
| Interest expense | 12 months, 2022-01-01 to 2022-12-31 | $15.1k | us-gaap:InterestExpense |
| Income tax | 12 months, 2022-01-01 to 2022-12-31 | −$16.1k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 12 months, 2022-01-01 to 2022-12-31 | $428.7k | us-gaap:NetIncomeLoss |
| Operating cash flow | 12 months, 2022-01-01 to 2022-12-31 | −$249.3k | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 12 months, 2022-01-01 to 2022-12-31 | $1.7m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Share repurchases | 12 months, 2022-01-01 to 2022-12-31 | $203.0k | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2022-12-31 | $19.1m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2022-12-31 | $21.6m | us-gaap:AssetsCurrent |
| Total assets | at 2022-12-31 | $34.7m | us-gaap:Assets |
| Current liabilities | at 2022-12-31 | $2.2m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2022-12-31 | $2.8m | us-gaap:Liabilities |
| Long-term debt | at 2022-12-31 | $312.0k | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2022-12-31 | $94.2k | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2022-12-31 | $31.9m | us-gaap:StockholdersEquity |

## Business

As filed, 26,181 characters.

### General and History

AGAU Mines, Inc., predecessor of United States Antimony Corporation (“USAC”, “U.S. Antimony” or “the Company”), was incorporated in June 1968 as a Delaware corporation to mine gold and silver. USAC was incorporated in Montana in January 1970 to process and sell antimony products. In June 1973, AGAU Mines, Inc. was merged into USAC. In December 1983, the Company suspended its antimony mining operations when it became possible to purchase antimony raw materials more economically from foreign sources.

In March 1998, we formed United States Antimony, Mexico S.A. de C.V. (“USAMSA”), to mine and smelt antimony in Mexico. Bear River Zeolite Company (“BRZ”) was incorporated in 2000, and it is mining and producing zeolite in southeastern Idaho.

During 2000, the Company formed a 75% owned subsidiary, Bear River Zeolite Company (“BRZ”), to mine and market zeolite and zeolite products from a mineral deposit in southeastern Idaho. In 2001, an operating plant was constructed at the zeolite site and zeolite extraction and sales commenced. During 2002, the Company acquired the remaining 25% of BRZ and continued to extract and sell zeolite products.

On August 19, 2005, the Company formed a 100% owned subsidiary, Antimonio de Mexico S.A. de C.V. (“AM”), to explore and develop potential antimony and silver deposits in Mexico.

During 2006, the Company acquired 100% ownership in USAMSA, which became a wholly-owned subsidiary of the Company.

In 2018, the Company acquired 100% ownership in Stibnite Holding Company US Inc. (previously Lanxess Holding Company US Inc.), Antimony Mining and Milling US LLC (previously Lanxess Laurel US LLC), a Delaware limited liability company and Lanxess Laurel de Mexico, S.A. de C.V (“Lanxess Laurel Mexico”), a Mexico corporation, both of which became a wholly-owned subsidiary of the Company.

Our principal business is the extraction, processing and sale of antimony, zeolite, silver and gold products. On May 16, 2012, we started trading on the NYSE MKT (now NYSE American) under the symbol UAMY.

As a mining company, we are subject to Subpart 1300 of Regulation S-K (“S-K 1300”), a regulation adopted by the U.S. Securities and Exchange Commission (“SEC”). Although we extract minerals from several of our properties that we later process and sell, S-K 1300 classifies each of our mining properties as an exploration stage property and our company as an exploration stage issuer because we have not prepared a technical report summary for any of our properties making a determination that the property contains proven and probable mineral reserves.

### Recent Developments

In August 2022, the Company entered into an agreement in principle with SB Wadley, S.A. de C.V. contemplating the purchase of the property, deposit, auxiliary infrastructure and equipment at a property in Mexico known as the Wadley property in exchange for an aggregate of $9 million plus tax, of which $2 million would be paid by the Company at execution of the definitive agreement and an additional $1 million would be paid by the Company on each of the first seven anniversaries of the execution of the definitive agreement. The transaction is subject to due diligence which must be completed by April 15, 2023, and definitive agreements which must be completed by April 30, 2023. During the due diligence period, the Company has the right to mine, retain sole ownership of all ore extracted from the mining claims, and conduct geological, geophysical and geochemical studies in exchange for monthly payments of $10,000 plus tax. In Feb 2023, because the owners of the Wadley had failed to provide USAC with the fiscal, corporate, and legal documentation they agreed to provide, it was agreed that the 8-month due-diligence period be extended another 8 months until October 15, 2023. This arrangement was accompanied with same monthly lease agreement and ore-rights exclusivity.

Page 5 of 91

#### Table of Contents

In August 2022, the Company’s 100% owned Mexican subsidiary, United States Antimony de Mexico S.A. de C.V. (“USAMSA”), agreed to pay Soluciones Empresariales Surmit, S.A. de C.V. (“Contractor”) up to approximately $1 million to assist USAMSA in its efforts to acquire surface rights on certain properties on which it holds mining claims \[at the Sierra Guadalupe property\]. As of June 30, 2023, USAMSA has paid the Contractor a total of $135,726 under this contract.

### Products and Segments

Our products consist of the foregoing:

- Antimony: includes antimony oxide, sodium antimonite, antimony trisulfide and antimony metal;
- Zeolite: includes coarse and fine zeolite crushed in various sizes; and
- Precious metals: includes unrefined and refined gold and silver.

In our operations in Montana, we produce antimony oxide, antimony metal, and precious metals. Antimony oxide is a fine, white powder that is used primarily in conjunction with a halogen to form a synergistic flame-retardant system for plastics, rubber, fiberglass, textile goods, paints, coatings and paper. Antimony oxide is also used as a color fastener in paint, as a catalyst for production of polyester resins and fibers and film, as a catalyst for production of polyethylene phthalate in plastic bottles, as a phosphorescent agent in fluorescent light bulbs, and as an opacifier for porcelains. The Company also sells antimony metal for use in bearings, storage batteries and ordnance.

In its operations in Idaho, the Company produces zeolite, a group of industrial minerals used in a variety of purposes including soil amendment and fertilizer. Zeolite is also used for water filtration, sewage treatment, nuclear waste and other environmental cleanup, odor control, gas separation and other miscellaneous applications.

The Company is currently organized and managed by four segments, which represent our operating units: United States antimony operations, Mexican antimony operations, precious metals recovery and United States zeolite operations.

The Puerto Blanco mill and the Madero smelter at the Company’s Mexico operation bring antimony up to an intermediate or finished stage, which may be sold directly or shipped to the United States operation for finishing at the Montana plant. The Puerto Blanco mill in Mexico is the site of our crushing and floatation plant, and a cyanide leach plant which will recover precious metals after the ore goes through the crushing and flotation cycles. A precious metals recovery plant is operated in conjunction with the antimony processing plant in Montana, where a 99% precious metals mix will be produced. Almost all of the sales of products from the United States antimony and zeolite operations are to customers in the United States, although the Company does have a sales operation in Canada.

For further information regarding our sales, see Note 16 in our consolidated audited financial statements included in this Annual Report.

### Antimony

Our Montana antimony smelter and precious metals plant is located in the Burns Mining District of Sanders County, Montana, approximately 15 miles west of Thompson Falls, Montana. We hold two patented mill sites where the plant is located. Environmental restrictions preclude mining at this site.

We rely on foreign sources for raw materials, and there are risks of interruption in procurement from these sources and/or volatile changes in world market prices for these materials that are not controllable by us. We have our own sources of antimony in Mexico, but we depend on foreign companies for raw material. We expect to receive raw materials from our owned and leased properties for 2023 and later years. We also work with suppliers in North America (including Mexico) and Central America. The acquisition of antimony ores is technically complex and a function of the country’s laws and regulations. U.S. Antimony’s policy consequently requires flexibility regarding supply agreements and is tailored on specific suppliers accordingly.

Page 6 of 91

#### Table of Contents

We currently own 100% of USAMSA, which was formed in April 1998. We currently own 100% of Antimony de Mexico SA de CV (“ADM”), which owns the San Miguel concession of the Los Juarez property. USAMSA has two divisions, (1) the Madero smelter in Coahuila, and (2) the Puerto Blanco flotation mill and oxide circuit in Guanajuato. ADM possesses the Los Juarez mineral deposit. ADM owns all of the mining concessions pertaining to the Los Juarez property except for the San Juan 3 concession, for which we have a long-term lease.

None of our antimony properties contains proven and probable mineral reserves.

We estimate (but have not independently confirmed) that our present share of the domestic market and international market for antimony oxide products is approximately 4% and less than 1%, respectively. We are the only significant U.S. producer of antimony products, while China supplies 92% of the world antimony demand. We believe we are competitive both domestically and world-wide due to the following:

- We have a reputation for quality products delivered on a timely basis.
- We have the only two operating, permitted antimony smelters in North and Central America.
- We are the only U.S. domestic producer of antimony products.
- We can ship on short notice to domestic customers.
- We are vertically integrated, with raw materials from our own mines, mills, and smelter in Mexico, along with the raw materials from exclusive supply agreements we have with numerous ore and raw material suppliers.
- Our smelter in Coahuila is the largest operating antimony smelter in Mexico or the United States with a current maximum capacity of about 32,600 pounds of feed per day and permitting for 50% to 70% expansion.

Following is a five-year schedule of our antimony sales:

| Year | Lbs. Metal Contained | Sales ($) | Average Price/Lb. |
| --- | ---: | ---: | ---: |
| 2022 | 1,394,036 | $7,631,671 | $5.47 |
| 2021 | 911,079 | $4,815,524 | $5.29 |
| 2020 | 815,310 | $2,942,628 | $3.61 |
| 2019 | 1,566,585 | $5,450,649 | $3.48 |
| 2018 | 1,486,120 | $6,113,014 | $4.11 |

#### Concentration of Sales:

During the years ended December 31, 2022 and 2021, the following sales were made to our four largest customers:

| Sales to largest customers | For the year ended December 31, 2022 | 2021 |
| --- | ---: | ---: |
| Company A | $1,882,667 | $1,141,608 |
| Company B | 1,863,958 | - |
| Company C | 827,822 | - |
| Company D | 751,328 | 518,227 |
| Company E | 737,189 | 474,738 |
| Company F | 735,194 | 850,301 |
| Company G | 226,633 | $1,728,406 |
|  | 7,024,791 | 4,713,280 |
| **% of Total Revenues** | 64% | 61% |

Page 7 of 91

#### Table of Contents

*Marketing:* We employ full-time marketing personnel and have negotiated various commission-based sales agreements with other chemical distribution companies.

*Antimony Price Fluctuations:* Our operating results have been, and will continue to be, related to the market prices of antimony metal, which have fluctuated widely in recent years. The volatility of prices is illustrated by the following table, which sets forth the average prices of antimony metal per pound, as reported by sources deemed reliable by us.

A five-year range of prices for antimony oxide and antimony metal, per pound, as reported by **Argus Metals** was as follows:

| Year | USAC SALES Metal Contained Price | Rotterdam |
| --- | ---: | ---: |
| 2022 | $5.47 | $6.01 |
| 2021 | $5.29 | $4.91 |
| 2020 | 3.61 | 2.45 |
| 2019 | 3.48 | 3.03 |
| 2018 | 4.11 | 3.74 |

Antimony metal prices are determined by a number of variables over which we have no control. These include the availability and price of imported metals, the quantity of new metal supply, and industrial demand. If metal prices decline and remain depressed, our revenues and profitability may be adversely affected.

*Suppliers*: We use various antimony raw materials to produce our products. We currently obtain antimony raw material from sources in Canada and Mexico and Central America.

### Zeolite

We own 100% of Bear River Zeolite, Inc. (“BRZ”). BRZ has a lease with Webster Farm, L.L.C. that entitles BRZ to surface mine and process zeolite on property located near Preston, Idaho, in exchange for a royalty payment. In 2010 the royalty was adjusted to $10 per ton sold. The current minimum annual royalty is $60,000. In addition, BRZ has identified more zeolite located on U.S. Bureau of Land Management land. The Company pays various royalties on the sale of zeolite products. Other royalty holders are paid a royalty that varies from $1 to $5 per ton. On a combined basis, royalties vary from 8%-13% of sales.

Shortly after inception, BRZ constructed a processing plant on the property which improved its productive capacity. Ground-breaking for an additional warehouse to store additional inventory and a shop to service equipment started in 2021 and the warehouse and shop were expected to be completed last year. A vertical-shaft-impactor crusher was replaced by a hammer mill for crushing line number 1 in 2021 for increased production rate. A replacement jaw crusher was installed and put into service in 2021. The new jaw crusher was further improved with a variable-speed apron feeder in late 2021 and subsequent and substantial improvements have been made to the jaw crusher in 2022. In 2021, the Company purchased a house in Preston Idaho for the express purpose of housing workers for its zeolite operation.

None of our zeolite properties contains any proven and probable mineral reserves.

Page 8 of 91

#### Table of Contents

“Zeolite” refers to a group of industrial minerals that consist of hydrated aluminosilicates that hold cations such as calcium, sodium, ammonium, various heavy metals, and potassium in their crystal lattice. Water is loosely held in cavities in the lattice. BRZ zeolite is regarded as one of the best zeolites in the world due to its high cation exchange capacity (“ CEC”) of approximately 180-220 meq/100 gr., its hardness and high clinoptilolite content, its absence of clay minerals, and its low sodium content. BRZ’s zeolite deposits’ characteristics which make the mineral useful for a variety of purposes including:

- Soil Amendment and Fertilizer. Zeolite has been successfully used to fertilize golf courses, sports fields, parks and common areas, and high value agricultural crops
- Water Filtration. Zeolite is used for particulate, heavy metal and ammonium removal in swimming pools, municipal water systems, fisheries, fish farms, and aquariums.
- Sewage Treatment. Zeolite is used in sewage treatment plants to remove nitrogen and as a carrier for microorganisms.
- Nuclear Waste and Other Environmental Cleanup. Zeolite has shown a strong ability to selectively remove strontium, cesium, radium, uranium, and various other radioactive isotopes from solution. Zeolite can also be used for the cleanup of soluble metals such as mercury, chromium, copper, lead, zinc, arsenic, molybdenum, nickel, cobalt, antimony, calcium, silver and uranium.
- Odor Control. A major cause of odor around cattle, hog, and poultry feed lots is the generation of the ammonium in urea and manure. The ability of zeolite to absorb ammonium prevents the formation of ammonia gas, which disperses the odor.
- Gas Separation. Zeolite has been used for some time to separate gases, to re-oxygenate downstream water from sewage plants, smelters, pulp and paper plants, and fish ponds and tanks, and to remove carbon dioxide, sulfur dioxide and hydrogen sulfide from methane generators as organic waste, sanitary landfills, municipal sewage systems, animal waste treatment facilities, and is excellent in pressure swing apparatuses.
- Animal Nutrition. According to other research, feeding up to 2% zeolite increases growth rates, decreases conversion rates, and prevents scours. BRZ does not make these claims.
- Miscellaneous Uses. Other uses include catalysts, petroleum refining, concrete, solar energy and heat exchange, desiccants, pellet binding, horse and kitty litter, floor cleaner and carriers for insecticides, pesticides and herbicides.

### Precious Metals

The Company processes antimony sources that sometimes contain precious metals. In such cases, the metallurgical techniques employed for the recovery of antimony are altered to also recover the precious metals. In 2022, the principal sources of antimony concentrates bearing precious metals came from a North American supply and to a much lesser extent, concentrates from the Los Juarez property. Financial and operational performance of precious metals for the year ended December 31, 2022 and 2021 was as follows:

| Precious metals | Year ended December 31, 2022 | 2021 | $ Change | % Change |
| --- | ---: | ---: | ---: | ---: |
| Total revenue - precious metals | $261,707 | $338,341 | (76,634) | (22.6%) |
| Gross profit precious metals | 151,167 | 231,077 | (79,910) | (34.6%) |
| Ounces sold - gold | 43.77 | 70 | (26.23) | (37.5%) |
| Ounces sold - silver | 25,122 | 27,342 | (2,220) | (8.1%) |

Page 9 of 91

#### Table of Contents

### Governmental Regulation

We are subject to the requirements of the Federal Mining Safety and Health Act of 1977, the Occupational Safety and Health Administration’s regulations, requirements of the state of Montana and the state of Idaho, federal and state health and safety statutes and Sanders County, Montana and Franklin County, Idaho health ordinances. The following is a summary of governmental regulation compliance areas which we believe are significant to our business and may have a material effect on our consolidated financial statements, earnings and/or competitive position.

### Health and Safety

We are subject to the regulations of the Mine Safety and Health Administration (“MSHA”) in the United States and the Mexico Ministry of Economy and Mining, and work with these agencies to address issues outlined in any investigations and inspections and continue to evaluate our safety practices. We strive to achieve excellent mine safety and health performance, and attempt to implement reasonable best practices with respect to mine safety and emergency preparedness. Achieving and maintaining compliance with regulations will be challenging and may increase our operating costs.

### Environmental

Our operations are subject to various environmental laws and regulations at the federal and state level. Compliance with environmental regulations, and litigation based on environmental laws and regulations, involves significant costs and can threaten existing operations or constrain expansion opportunities. Mine closure and reclamation regulations impose substantial costs on our operations and include requirements that we provide financial assurance supporting those obligations. We have over $200,000 of financial assurances, primarily in the form of surety bonds, for reclamation company-wide. We anticipate approximately $15,000 in expenditures in 2023 for idle property management and environmental permit compliance.

### Licenses, Permits and Claims/Concessions

We are required to obtain various licenses and permits to operate our mines and conduct exploration and reclamation activities. Targets at our Los Juarez exploration project in Mexico, our planned exploration at Wadley and Sierra Guadalupe can only be developed if we are successful in obtaining the necessary permits. In addition, our operations and exploration activities in Mexico are conducted pursuant to claims or concessions granted by the host government, and otherwise are subject to claims renewal and minimum work commitment requirements, which are subject to certain political risks associated with foreign operations.

### Environmental Matters

Our exploration, development and production programs conducted in the United States are subject to local, state and federal regulations regarding environmental protection. Some of our production and mining activities are conducted on public lands. We believe that our current discharge of waste materials from our processing facilities is in material compliance with environmental regulations and health and safety standards. The U.S. Forest Service extensively regulates mining operations conducted in National Forests. Department of Interior regulations cover mining operations carried out on most other public lands. All operations by us involving the exploration for or the production of minerals are subject to existing laws and regulations relating to exploration procedures, safety precautions, employee health and safety, air quality standards, pollution of water sources, waste materials, odor, noise, dust and other environmental protection requirements adopted by federal, state and local governmental authorities. We may be required to prepare and present data to these regulatory authorities pertaining to the effect or impact that any proposed exploration for, or production of, minerals may have upon the environment. Any changes to our reclamation and remediation plans, which may be required due to changes in state or federal regulations, could have an adverse effect on our operations. The range of reasonably possible loss in excess of the amounts accrued, by site, cannot be reasonably estimated at this time.

We accrue environmental liabilities when the occurrence of such liabilities is probable and the costs are reasonably estimable. The initial accruals for all our sites are based on comprehensive remediation plans approved by the various regulatory agencies in connection with permitting or bonding requirements. Our accruals are further based on presently enacted regulatory requirements and adjusted only when changes in requirements occur or when we revise our estimate of costs to comply with existing requirements. As remediation activity has physically commenced, we have been able to refine and revise our estimates of costs required to fulfill future environmental tasks based on contemporaneous cost information, operating experience, and changes in regulatory requirements. In instances where costs required to complete our remaining environmental obligations are clearly determined to be in excess of the existing accrual, we have adjusted the accrual accordingly. When regulatory agencies require additional tasks to be performed in connection with our environmental responsibilities, we evaluate the costs required to perform those tasks and adjust our accrual accordingly, as the information becomes available. In all cases, however, our accrual at year-end is based on the best information available at that time to develop estimates of environmental liabilities.

Page 10 of 91

#### Table of Contents

### Antimony Processing Site

We have environmental remediation obligations at our antimony processing site near Thompson Falls, Montana (“the Stibnite Hill Mine Site”). We are under the regulatory jurisdiction of the U.S. Forest Service and subject to the operating permit requirements of the Montana Department of Environmental Quality. At December 31, 2022 and 2021, we have accrued $100,000 to fulfill our environmental responsibilities.

### BRZ

During 2001, we recorded a reclamation accrual for our BRZ subsidiary, based on an analysis performed by us and reviewed and approved by regulatory authorities for environmental bonding purposes. The accrual of $7,500 represents our estimated costs of reclaiming, in accordance with regulatory requirements, the acreage disturbed by our zeolite operations, and remains unchanged at December 31, 2022.

### General

Reclamation activities at the Thompson Falls Antimony Plant were performed regularly under supervision of the U.S. Forest Service and Montana Department of Environmental Quality. We have complied with regulators’ requirements and do not expect the imposition of substantial additional requirements.

We have posted cash performance bonds with a bank and the U.S. Forest Service in connection with our reclamation activities.

We believe we have accrued adequate reserves to fulfill our environmental remediation responsibilities as of December 31, 2022 and 2021. We have made significant reclamation and remediation progress on all our properties over thirty years and have complied with regulatory requirements in our environmental remediation efforts.

### Competition

We compete with other mineral resource exploration and development companies for financing and for the acquisition of new mineral properties and for equipment and labor related to exploration and development of mineral properties. Many of the mineral resource exploration and development companies with whom we compete have greater financial and technical resources. Accordingly, competitors may be able to spend greater amounts on acquisitions of mineral properties of merit, on exploration of their mineral properties and on development of their mineral properties. In addition, they may be able to afford greater geological expertise in the targeting and exploration of mineral properties. This competition could result in competitors having mineral properties of greater quality and interest to prospective investors who may finance additional exploration and development. This competition could adversely impact our ability to finance further exploration and to achieve the financing necessary to develop its mineral properties.

We provide no assurance we will be able to compete in any of our business areas effectively with current or future competitors or that the competitive pressures faced by us will not have a material adverse effect on the business, financial condition and operating results.

### Employees

As of December 31, 2022, we employed 16 full-time employees in Montana. In addition, we employed 23 people at our zeolite plant and mining operation in Idaho, and 39 employees at our mining, milling and smelting operation in Mexico. The number of full-time employees may vary seasonally. None of our employees are covered by any collective bargaining agreement,

Page 11 of 91

#### Table of Contents

### Intellectual Property

We hold no material patents, licenses, franchises or concessions. However, we consider our antimony processing plants proprietary in nature.

## Risk factors

As filed, 71,625 characters.

The following risks and uncertainties, together with the other information set forth in this report, should be carefully considered by those who invest in our securities. Any of the following material risk factors could adversely affect our business, financial condition or operating results and could decrease the value of our common or preferred stock or other outstanding securities. These are not all of the risks we face, and other factors not presently known to us or that we currently believe are immaterial may also affect our business if they occur

### Financial Risks

### We have experienced losses in recent years and may continue to incur losses.

We have experienced a loss from operations and a net loss in each of the fiscal years ended December 31, 2019, 2020, and 2021. We may continue to experience losses in the future. Many of the factors affecting our operating results are beyond our control, including, but not limited to, the volatility of metals prices; smelter terms; rock and soil conditions; seismic events; availability of hydroelectric power; diesel fuel prices; interest rates; foreign exchange rates; global or regional political or economic policies; inflation; availability and cost of labor; economic developments and crises; governmental regulations; continuity of orebodies; ore grades; recoveries; performance of equipment; price speculation by certain investors; and purchases and sales by central banks and other holders and producers of gold and silver in response to these factors. We cannot assure you that we will not experience net losses in the future. Continued losses may have an adverse effect on our cash balances, require us to curtail certain activities and investments, raise additional capital or sell assets.

### Deferred or contingent payment obligations may create financial risk for our business

We are conducting due diligence pursuant to a preliminary agreement to acquire assets located in Mexico known as the Wadley property. If the transaction proceeds on the terms set out in the preliminary agreement, we will be required to make an initial payment of $2 million followed by seven annual payments of $1 million (in each case, plus tax). We cannot assure you that such efforts would be successful. As a result, our business and financial condition could be harmed.

***We may seek*** **or** ***require additional financing, which may not be available on acceptable terms, if at all.***

We may seek to source additional financing by way of private or public offerings of equity or debt or the sale of project or property interests in order to have sufficient capital to engage in acquisitions, investments and for general working capital. We can give no assurance that financing will be available to it or, if it is available, that it will be offered on acceptable terms. If additional financing is raised by the issuance of our equity securities, control of our company may change, security holders will suffer additional dilution and the price of the common stock may decrease. If additional financing is raised through the issuance of indebtedness, we will require additional financing in order to repay such indebtedness. Failure to obtain such additional financing could result in the delay or indefinite postponement of further acquisitions, investments, exploration and development, curtailment of business activities or even a loss of property interests.

Page 12 of 91

#### Table of Contents

***Metal prices are volatile. A substantial or extended decline in metals prices would have a material adverse effect on us.***

Our revenue is derived primarily from the sale of antimony and zeolite products, and to a lesser extent silver and gold products, and, as a result, our earnings are directly related to the prices of these metals and products. Antimony, zeolite, silver and gold prices fluctuate widely and are affected by numerous factors, including:

- speculative activities;
- relative exchange rates of the U.S. dollar;
- global and regional demand and production;
- political instability;
- inflation, recession or increased or reduced economic activity; and
- other political, regulatory and economic conditions.

These factors are largely beyond our control and are difficult to predict. If the market prices for these metals and products fall below our production, exploration or development costs for a sustained period of time, we will experience losses and may have to discontinue exploration, development or operations, or incur asset write-downs at one or more of our properties. See *Item 1. Business - Introduction* for information on the average price of antimony for the last five years.

***An extended decline in metals prices, an increase in operating or capital costs, mine accidents or closures, increasing regulatory obligations, or our inability to convert resources or exploration targets to reserves may cause us to record write-downs, which could negatively impact our results of operations.***

When events or changes in circumstances indicate the carrying value of our long-lived assets may not be recoverable, we review the recoverability of the carrying value by estimating the future undiscounted cash flows expected to result from the use and eventual disposition of the asset. Impairment must be recognized when the carrying value of the asset exceeds these cash flows. Recognizing impairment write-downs could negatively impact our results of operations. Metals price estimates are a key component used in the evaluation of the carrying values of our assets, as the evaluation involves comparing carrying values to the average estimated undiscounted cash flows resulting from operating plans using various metals price scenarios. Our estimates of undiscounted cash flows for our long-lived assets also include an estimate of the market value of the resources and exploration targets beyond the current operating plans.

We determined no impairments were required for 2022. If the prices of antimony or zeolite decline for an extended period of time, if we fail to control production or capital costs, if regulatory issues increase costs or decrease production, or if we do not realize the mineable ore reserves, resources or exploration targets at our mining properties, we may be required to recognize asset write-downs in the future. In addition, the perceived market value of the resources and exploration targets of our properties is dependent upon prevailing metals prices as well as our ability to discover economic ore. A decline in metals prices for an extended period of time or our inability to convert resources or exploration targets to reserves could significantly reduce our estimates of the value of the resources or exploration targets at our properties and result in asset write-downs.

### Our profitability could be affected by the prices of other commodities.

Our profitability is sensitive to the costs of commodities such as fuel, steel, and cement. While the recent prices for such commodities have been stable or in decline, prices have been historically volatile, and material increases in commodity costs could have a significant effect on our results of operations.

***We are subject to the risk of fluctuations in the relative values of the U.S. Dollar and Mexican Peso.***

We may be adversely affected by foreign currency fluctuations. Certain of our assets are located in Mexico. Our expenses relative to our Mexican assets, and in certain cases those assets themselves, may be denominated in Mexican Pesos. Fluctuations in the exchange rates between the U.S. Dollar and the Mexican Peso may therefore have a material adverse effect on the Company’s financial results. Mexico has experienced periods of significant inflation. If Mexico experiences substantial inflation in the future, the Company’s costs in peso terms will increase significantly, subject to movements in applicable exchange rates.

Page 13 of 91

#### Table of Contents

***Our liabilities for environmental reclamation may exceed the amounts accrued on our financial statements.***

Our research, development, manufacturing and production processes involve the controlled use of hazardous materials, and we are subject to various environmental and occupational safety laws and regulations governing the use, manufacture, storage, handling, and disposal of hazardous materials and some waste products. The risk of accidental contamination or injury from hazardous materials cannot be completely eliminated. In the event of an accident, we could be held liable for any damages that result and any liability could exceed our financial resources. We also have one ongoing environmental reclamation and remediation project at our current production facility in Montana. Adequate financial resources may not be available to ultimately finish the reclamation activities if changes in environmental laws and regulations occur, and these changes could adversely affect our cash flow and profitability. We expect to have environmental reclamation obligations, and may be liable for environmental contamination, on our other current and former mining properties and processing facilities. We do not have environmental liability insurance now, and we do not expect to be able to obtain insurance at a reasonable cost. If we incur liability for environmental damages while we are uninsured, it could have a harmful effect on our financial condition and results of operations. The range of reasonably possible losses from our exposure to environmental liabilities in excess of amounts accrued to date cannot be reasonably estimated at this time.

### Our accounting and other estimates may be imprecise.

Preparing consolidated financial statements requires management to make estimates and assumptions that affect the reported amounts and related disclosure of assets, liabilities, revenue and expenses at the date of the consolidated financial statements and reporting periods. The more significant areas requiring the use of management assumptions and estimates relate to:

- mineral reserves, resources, and exploration targets that are the basis for future income and cash flow estimates and units-of-production depreciation, depletion and amortization calculations;
- environmental, reclamation and closure obligations;
- permitting and other regulatory considerations;
- asset impairments;
- valuation of business combinations;
- future foreign exchange rates, inflation rates and applicable tax rates;
- reserves for contingencies and litigation; and
- deferred tax asset and liability valuation allowance.

Future estimates and actual results may differ materially from these estimates as a result of using different assumptions or conditions. For additional information, see *Critical Accounting Estimates* in *Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations, Note 2* of *Notes to Consolidated Financial Statements.”*

### Risks Related to Our Operations and the Mining Industry

***Mining is an inherently speculative business. The properties on which we have the right to mine for precious minerals are not known to have any proven and probable mineral reserves and we have proceeded to extract minerals without having completed the technical work required to declare a mineral reserve. If we are unable to extract antimony, zeolite or other minerals which can be mined at a profit, our business could fail.***

Page 14 of 91

#### Table of Contents

Natural resource mining, and precious metal mining, in particular, is a business that by its nature is speculative. We have not completed an S-K 1300 technical report summary, nor have we declared proven and probable mineral reserves on any of our properties. Where applicable, we have commenced extraction activities prior to identifying a mineral reserve. There is a strong possibility that we will not discover antimony, zeolite, or any other minerals which can be mined or extracted at a profit. Even if we do discover and mine precious metal deposits, the deposits may not be of the quality or size necessary for us or a potential purchaser of the property to make a profit from mining it. Few properties that are explored are ultimately developed into producing mines, and mines that are developed may not be profitable. Unusual or unexpected geological formations, geological formation pressures, fires, power outages, labor disruptions, flooding, explosions, cave-ins, landslides and the inability to obtain suitable or adequate machinery, equipment or labor are just some of the many risks involved in mineral exploration programs and the subsequent development of gold deposits. If we are unable to extract antimony, zeolite or other minerals which can be mined at a profit, our business could fail.

***Natural disasters, public health crises (including COVID-19), political crises, and other catastrophic events or other events outside of our control may materially and adversely affect our business or financial results.***

If any of our facilities or the facilities of our suppliers, third-party service providers, or customers is affected by natural disasters, such as earthquakes, floods, fires, power shortages or outages, public health crises (such as pandemics and epidemics), political crises (such as terrorism, war, political instability or other conflict), or other events outside of our control, our operations or financial results could suffer. Any of these events could materially and adversely impact us in a number of ways, including through decreased production, increased costs, decreased demand for our products due to reduced economic activity or other factors, or the failure by counterparties to perform under contracts or similar arrangements.

Our business could be materially and adversely affected by the risks, or the public perception of the risks, related to a pandemic or other health crisis, such as the recent outbreak of novel coronavirus (COVID-19). A significant outbreak of contagious diseases in the human population could result in a widespread health crisis that could adversely affect our planned operations. Such events could result in the complete or partial closure of our operations. In addition, it could impact economies and financial markets, resulting in an economic downturn that could impact our ability to raise capital. The pandemic that has been going on for the past two years has specifically affected our ability to obtain supplies and services to maintain our business. This ongoing health crisis has reduced the ability of the regulating agencies to process our permits on a timely basis which could delay our ability to operate at maximum efficiency. Our ability to obtain and retain qualified employees has also been adversely affected by this global health crisis.

We continue to monitor the rapidly evolving situation and guidance from federal, state, local and foreign governments and public health authorities and may take additional actions based on their recommendations. The extent of the impact of COVID-19 and any subsequent variants on our business and financial results will also depend on future developments, including the duration and spread of the outbreak within the markets in which we operate and the related impact on prices, demand, creditworthiness and other market conditions and governmental reactions, all of which are highly uncertain.

***Mining accidents or other adverse events at an operation could decrease our anticipated production or otherwise adversely affect our operations.***

Production may be reduced below our historical or estimated levels for many reasons, including, but not limited to, mining accidents; unfavorable ground or shaft conditions; work stoppages or slow-downs; lower than expected ore grades; unexpected regulatory actions; if the metallurgical characteristics of ore are less economic than anticipated; or because our equipment or facilities fail to operate properly or as expected. Our operations are subject to risks relating to ground instability, including, but not limited to, pit wall failure, crown pillar collapse, seismic events, backfill and stope failure or the breach or failure of a tailings impoundment. The occurrence of an event such as those described above could result in loss of life or temporary or permanent cessation of operations, any of which could have a material adverse effect on our financial condition and results of operations. Other closures or impacts on operations or production may occur at any of our mines at any time, whether related to accidents, changes in conditions, changes to regulatory policy, or as precautionary measures.

In addition, our operations are typically in remote locations, where conditions can be inhospitable, including with respect to weather, surface conditions, interactions with wildlife or otherwise in or near dangerous conditions. In the past we have had employees, contractors, or employees of contractors get injured, sometimes fatally, while working in such challenging locations. An accident or injury to a person at or near one of our operations could have a material adverse effect on our financial condition and results of operations.

Page 15 of 91

#### Table of Contents

***We may not be able to maintain the infrastructure necessary to conduct mining activities.***

Our mining activities depend upon adequate infrastructure. Reliable roads, bridges, power sources and water supply are important factors which affect capital and operating costs. Unusual or infrequent weather phenomena, sabotage, government or other interference in the maintenance or provision of such infrastructure could adversely affect our mining activities and financial condition.

### Our mining activities may be adversely affected by the local climate.

The local climate sometimes affects our mining activities on our properties. Earthquakes, heavy rains, snowstorms, and floods could result in serious damage to or the destruction of facilities, equipment or means of access to our property, or could occasionally prevent us temporarily from conducting mining activities on our property. \[Because of their rural location and the lack of developed infrastructure in the area, our mineral properties in Montana and Idaho are occasionally impassable during the winter season.\] During this time, it may be difficult for us to access our property, maintain production rates, make repairs, or otherwise conduct mining activities on them.

***Certain of our mining properties and smelter operations are located in Mexico and may be subject to geo-political risk.***

Certain of our mining properties and smelter operations are located in Mexico. Any political or social disruptions unique to Mexico would have a material impact on our operations, financial performance and stability. Additionally, our properties and projects are subject to the laws of Mexico, and we may be negatively impacted by the existing laws and regulations of that country, as they apply to mineral exploration, land ownership, royalty interests and taxation, and by any potential changes of such laws and regulations.

Any changes in regulations or shifts in political conditions are beyond our control or influence and may adversely affect our business, or if significant enough, may result in the impairment or loss of mineral concessions or other mineral rights, or may make it impossible to continue its mineral exploration and mining activities in such areas.

***Our operations are subject to hazards and risks normally associated with the exploration and development of mineral properties.***

Our operations are subject to hazards and risks normally associated with the exploration and development of mineral properties, any of which could cause delays in the progress of our exploration and development plans, damage or destruction of property, loss of life and/or environmental damage. Some of these risks include, but are not limited to, unexpected or unusual geological formations, rock bursts, cave-ins, flooding, fires, earthquakes; unanticipated changes in metallurgical characteristics and mineral recovery; unanticipated ground or water conditions; changes in the regulatory environment; industrial or labor disputes; hazardous weather conditions; cost overruns; land claims; and other unforeseen events. A combination of experience, knowledge and careful evaluation may not be able to overcome these risks.

The nature of these risks is such that liabilities may exceed any insurance policy coverages; the liabilities and hazards might not be insurable or the Company might not elect to insure itself against such liabilities due to excess premium costs or other factors. Such liabilities may have a material adverse effect on our financial condition and operations and could reduce or eliminate any future profitability and result in increased costs and a decline in the value of our securities.

Page 16 of 91

#### Table of Contents

***Our non-extractive properties may not be brought into a state of commercial production.***

Development of mineral properties involves a high degree of risk and few properties that are explored are ultimately developed into producing mines. The commercial viability of a mineral deposit is dependent upon a number of factors which are beyond our control, including the attributes of the deposit, commodity prices, government policies and regulation and environmental protection. Fluctuations in the market prices of minerals may render reserves and deposits containing relatively lower grades of mineralization uneconomic. The development of our non-extractive properties will require obtaining land use consents, permits and the construction and operation of mines, processing plants and related infrastructure. We are subject to all of the risks associated with establishing new mining operations, including:

- the timing and cost, which can be considerable, of the construction of mining and processing facilities and related infrastructure;
- the availability and cost of skilled labor and mining equipment;
- the availability and cost of appropriate smelting and/or refining arrangements;
- the need to obtain and maintain necessary environmental and other governmental approvals and permits, and the timing of those approvals and permits;
- in the event that the required permits are not obtained in a timely manner, mine construction and ramp-up will be delayed and the risks of government environmental authorities issuing directives or commencing enforcement proceedings to cease operations or administrative, civil and criminal sanctions being imposed on our company, directors and employees;
- delays in obtaining, or a failure to obtain, access to surface rights required for current or future operations;
- the availability of funds to finance construction and development activities;
- potential opposition from non-governmental organizations, environmental groups or local community groups which may delay or prevent development activities; and
- potential increases in construction and operating costs due to changes in the cost of fuel, power, materials and supplies and foreign exchange rates.

It is common in new mining operations to experience unexpected costs, problems and delays during development, construction and mine ramp-up. Accordingly, there are no assurances that our non-extractive properties will be brought into a state of commercial production.

***Actual capital costs, operating costs, production and economic returns may differ significantly from those we have anticipated and there are no assurances that any future development activities will result in profitable mining operations.***

The capital costs to take projects into commercial production may be significantly higher than anticipated. Capital costs, operating costs, production and economic returns and other estimates may prove to differ significantly from those used by us to decide to commence extraction, and there can be no assurance that our actual capital and operating costs will not be higher than currently anticipated. As a result of higher capital and operating costs, production and economic returns may differ significantly from those we have anticipated.

### We may face equipment shortages, access restrictions and lack of infrastructure.

Natural resource exploration, development and mining activities are dependent on the availability of mining, drilling and related equipment in the particular areas where such activities are conducted. A limited supply of such equipment or access restrictions may affect the availability of such equipment to us and may delay exploration, development or extraction activities. Certain equipment may not be immediately available or may require long lead time orders. A delay in obtaining necessary equipment for mineral exploration, including drill rigs, could have a material adverse effect on our operations and financial results.

Page 17 of 91

#### Table of Contents

Mining, processing, development and exploration activities also depend, to one degree or another, on the availability of adequate infrastructure. Reliable roads, bridges, power sources, fuel and water supply and the availability of skilled labor and other infrastructure are important determinants that affect capital and operating costs. The establishment and maintenance of infrastructure, and services are subject to a number of risks, including risks related to the availability of equipment and materials, inflation, cost overruns and delays, political or community opposition and reliance upon third parties, many of which are outside our control. The lack of availability on acceptable terms or the delay in the availability of any one or more of these items could prevent or delay development or ongoing operation of our projects.

Exploration of mineral properties is less intrusive, and generally requires fewer surface and access rights, than properties developed for mining. No assurances can be provided that we will be able to secure required surface rights on favorable terms, or at all. Any failure by us to secure surface rights could prevent or delay development of our projects.

### Insurance may not be available to us.

Mineral exploration is subject to risks of human injury, environmental and legal liability and loss of assets. We may elect not to have insurance for certain risks because of the high premiums associated with insuring those risks or, in some cases, insurance may not be available for certain risks. Occurrence of events for which we are not insured could have a material adverse effect on our financial position or results of operations.

***Our business depends on availability of skilled personnel and good relations with employees.***

We are dependent upon the ability and experience of our executive officers, managers, employees, contractors and their employees, and other personnel, and we cannot assure you that we will be able to attract or retain such employees or contractors. We may at times have insufficient executive or operational personnel, or personnel whose skills require improvement. We compete with other companies both in and outside the mining industry in recruiting and retaining qualified employees and contractors knowledgeable about the mining business. From time to time, we have encountered, and may in the future encounter, difficulty recruiting skilled mining personnel at acceptable wage and benefit levels in a competitive labor market, and may be required to utilize contractors, which can be more costly. Temporary or extended lay-offs due to mine closures may exacerbate such issues and result in vacancies or the need to hire less skilled or efficient employees or contractors. The loss of skilled employees or contractors or our inability to attract and retain additional highly skilled employees and contractors could have an adverse effect on our business and future operations.

***A significant disruption to our information technology could adversely affect our business, operating result and financial position.***

We rely on a variety of information technology and automated systems to manage and support our operations. For example, we depend on our information technology systems for financial reporting, data base management, operational and investment management and internal communications. These systems contain our proprietary business information and personally identifiable information of our employees. The proper functioning of these systems and the security of this data is critical to the efficient operation and management of our business. In addition, these systems could require upgrades as a result of technological changes or growth in our business. These changes could be costly and disruptive to our operations and could impose substantial demands on management time. Our systems and those of third-party providers, could be vulnerable to damage or disruption caused by catastrophic events, power outages, natural disasters, computer system or network failures, viruses, ransomware or malware, physical or electronic break-ins, unauthorized access, or cyber-attacks. Any security breach could compromise our networks, and the information contained there-in could be improperly accessed, disclosed, lost or stolen. Because techniques used to sabotage, obtain unauthorized access to systems or prohibit authorized access to systems change frequently and generally are not detected until successfully launched against a target, we may not be able to anticipate these attacks nor prevent them from harming our business or network. Any unauthorized activities could disrupt our operations, damage our reputation, be costly to fix or result in legal claims or proceedings, any of which could adversely affect our business, reputation or operating results.

Page 18 of 91

#### Table of Contents

### Competition from other mining companies may harm our business.

We compete with other mining companies, some of which have greater financial resources than we do or other advantages, in various areas which include:

- attracting and retaining key executives, skilled labor, and other employees;
- for the services of other skilled personnel and contractors and their specialized equipment, components and supplies, such as drill rigs, necessary for exploration and development;
- for contractors that perform mining and other activities and milling facilities which we lease or toll mill through; and
- for rights to mine properties.

### Risks Relating to Our Organization and Common Stock

***Our Articles of Incorporation allow for our board to create new series of preferred stock without further approval by our stockholders, which could adversely affect the rights of the holders of our common stock.***

Our board of directors (the “Board”) has the authority to fix and determine the relative rights and preferences of preferred stock. Our Board also has the authority to issue preferred stock without further stockholder approval. As a result, our Board could authorize the issuance of a series of preferred stock that would grant to holders the preferred right to our assets upon liquidation, the right to receive dividend payments before dividends are distributed to the holders of common stock and the right to the redemption of the shares, together with a premium, prior to the redemption of our common stock. In addition, our Board could authorize the issuance of a series of preferred stock that has greater voting power than our common stock or that is convertible into our common stock, which could decrease the relative voting power of our common stock or result in dilution to our existing stockholders.

***If we lose John Gustavsen, our Chief Executive Officer, or any of our other key personnel, we may encounter difficulty replacing their expertise, which could impair our ability to implement our business plan successfully.***

We believe that our ability to implement our business strategy and our future success depends on the continued employment of our management team, in particular our President, Russell Lawrence, and our Chief Executive Officer, John Gustavsen. Our management team, who have extensive experience in the mining industry, may be difficult to replace. The loss of the technical knowledge and mining industry expertise of these key employees could make it difficult for us to execute our business plan effectively and could cause a diversion of resources while we seek replacements.

In addition, our operations require employees, consultants, advisors and contractors with a high degree of specialized technical, management and professional skills, such as engineers, trades people, geologists and equipment operators. We compete both locally and internationally for such professionals. We may be unsuccessful in attracting and maintaining key employees. If we are unable to acquire the talents we seek, we could experience higher operating costs, poorer results and an overall lack of success in implementing our business plans.

Page 19 of 91

#### Table of Contents

***The price of our common stock has a history of volatility and could decline in the future.***

Shares of our common stock are listed on NYSE American. The market price for our common stock has been volatile, often based on:

- changes in metals prices, particularly antimony;
- our results of operations and financial condition as reflected in our public news releases or periodic filings with the SEC;
- factors unrelated to our financial performance or future prospects, such as global economic developments, market perceptions of the attractiveness of particular industries, or the reliability of metals markets;
- political and regulatory risk;
- the success of our exploration, pre-development, and capital programs;
- ability to meet production estimates;
- environmental, safety and legal risk;
- the extent and nature of analytical coverage concerning our business;
- the trading volume and general market interest in our securities; and
- delayed financial filings with the Securities Exchange Commission.

The market price of our stock at any given point in time may not accurately reflect our value, and may prevent stockholders from realizing a profit on, or recovering, their investment.

***If we were liquidated, our common stockholders could lose part, or all, of their investment.***

In the event of our dissolution, the proceeds, if any, realized from the liquidation of our assets will be distributed to our stockholders only after the satisfaction of the claims of our creditors and preferred stockholders. The ability of a purchaser of shares to recover all, or any portion, of the purchase price for the shares, in that event, will depend on the amount of funds realized and the claims to be satisfied by those funds.

***Our Series B preferred stock has a liquidation preference of $1.00 per share or $750,000.***

If we were liquidated, holders of our preferred stock would be entitled to receive approximately $750,000 (plus any accrued and unpaid dividends) from any liquidation proceeds before holders of our common stock would be entitled to receive any proceeds.

***Our Series C preferred stock has a liquidation preference of $0.55 per share or $97,847.***

If we were liquidated, holders of our preferred stock would be entitled to receive approximately $97,847 (plus any accrued and unpaid dividends) from any liquidation proceeds before holders of our common stock would be entitled to receive any proceeds, but after holders of all notes issued under the indenture governing our Senior Notes received any proceeds.

***Our Series D preferred stock has a liquidation preference of $2.50 per share or $4,231,680.***

If we were liquidated, holders of our preferred stock would be entitled to receive approximately $5,019,410 (plus any accrued and unpaid dividends) from any liquidation proceeds before holders of our common stock would be entitled to receive any proceeds, but after holders of all notes issued under the indenture governing our Senior Notes received any proceeds.

### We do not expect to pay dividends to our stockholders in the foreseeable future.

We have no plans to pay dividends in the foreseeable future. Our directors will determine if and when dividends should be declared and paid in the future based on our financial position at the relevant time.

Page 20 of 91

#### Table of Contents

***The issuance of additional equity securities in the future could adversely affect holders of common stock.***

The market price of our common stock may be influenced by any preferred or common stock or options, warrants, convertible debt or other rights to acquire any preferred or common stock we may issue. Our Board is authorized to issue additional classes or series of preferred stock without any action on the part of our stockholders. This includes the power to set the terms of any such classes or series of preferred stock that may be issued, including voting rights, dividend rights and preferences over common stock with respect to dividends or upon the liquidation, dissolution or winding up of the business and other terms. If we issue preferred stock in the future that has preference over our common stock with respect to the payment of dividends or upon liquidation, dissolution or winding up, or if we issue preferred stock with voting rights that dilute the voting power of our common stock, the rights of holders of the common stock or the market price of the common stock could be adversely affected. Our Board is also authorized to issue additional shares of common stock and rights to acquire common stock.

We cannot predict the number of additional equity securities that will be issued or the effect, if any, that future issuances and sales of the securities will have on the market price of the common stock. Any transaction involving the issuance of previously authorized but unissued equity securities would result in dilution, possibly substantial, to stockholders. Based on the need for additional capital to fund expected expenditures and growth, it is likely that we will issue securities to provide such capital. Such additional issuances may involve the issuance of a significant number of equity securities at prices less than the current market price. Sales of substantial amounts of securities, or the availability of the securities for sale, could adversely affect the prevailing market prices for the securities and dilute investors’ earnings per share. A decline in the market prices of the securities could impair our ability to raise additional capital through the sale of additional securities should we desire to do so.

***The provisions in our certificate of incorporation, our by-laws and Montana law could delay or deter tender offers or takeover attempts.***

Certain provisions in our restated certificate of incorporation, our by-laws and Montana law could make it more difficult for a third party to acquire control of us, even if that transaction could be beneficial to stockholders. These impediments include:

- the classification of our Board into three classes serving staggered three-year terms, which makes it more difficult to quickly replace board members;
- the ability of our Board to issue shares of preferred stock with rights as it deems appropriate without stockholder approval;
- a provision that special meetings of our board of directors may be called only by our chief executive officer or a majority of our Board;
- a provision that special meetings of stockholders may only be called pursuant to a resolution approved by a majority of our Board;
- a prohibition against action by written consent of our stockholders;
- a provision that our directors may only be removed for cause and by an affirmative vote of at least 80% of the outstanding voting stock;
- a provision that our stockholders comply with advance-notice provisions to bring director nominations or other matters before meetings of our stockholders;
- a prohibition against certain business combinations with an acquirer of 15% or more of our common stock for three years after such acquisition unless the stock acquisition or the business combination is approved by our Board prior to the acquisition of the 15% interest, or after such acquisition our Board and the holders of two-thirds of the other common stock approve the business combination; and
- a prohibition against our entering into certain business combinations with interested stockholders without the affirmative vote of the holders of at least 80% of the voting power of the then outstanding shares of voting stock.

In addition, amendment of most of the provisions described above requires approval of at least 80% of the outstanding voting stock.

Page 21 of 91

#### Table of Contents

### Legal, Regulatory and Compliance Risks

***As a public company, we are obligated to develop and maintain proper and effective disclosure controls and procedures and internal control over financial reporting, and if we fail to develop and maintain an effective system of disclosure controls and procedures and internal control over financial reporting, our ability to produce timely and accurate financial statements and other required disclosures and to comply with applicable laws and regulations could be impaired.***

As a public company, we are subject to the reporting requirements of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), the Sarbanes-Oxley Act of 2002 (the “Sarbanes-Oxley Act”), the Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010, the listing requirements of NYSE American, and other applicable securities rules and regulations. Compliance with these rules and regulations may be difficult, time-consuming, or costly, and compliance may increase demand on our systems and resources. The Exchange Act requires, among other things, that we file annual, quarterly, and current reports with respect to our business and operating results. The Sarbanes-Oxley Act requires, among other things, that we maintain effective disclosure controls and procedures and internal control over financial reporting and that we refrain from making any loans to our executive officers and directors.

Although we have attempted to comply with applicable regulations, we have identified several compliance problems that we are seeking to remedy. For example, in 2022, we loaned $6,500 to a former executive officer in violation of the Sarbanes-Oxley Act. Our management has concluded that as at December 31, 2022, neither our disclosure controls and procedures nor our internal control over financial reporting was effective. See Item 9A. In early 2023, we determined that a former employee, who had previously held significant financial responsibilities within our company, misappropriated approximately $21,510 of our funds in 2020 through 2023 for personal benefit. A full investigation ensued and the former employee was approached. The former employee executed a promissory note in favor of our company in the amount of $21,310 in June 2023, and has recently begun making payments due under the obligation. The note bears interest at twelve percent (12%) per annum with monthly payments of $500. To date the former employee has re-paid $700. We failed to file our Form 10-K annual report for fiscal 2022 and Form 10-Q report for the quarter ended March 31, 2023 on a timely basis.

It may require significant resources and management oversight to effectively comply with our regulatory obligations and to avoid future violations. In addition, significant resources and management oversight may also be required to maintain and, if necessary, improve our disclosure controls and procedures and internal control over financial reporting. As a result of our efforts to comply with the above rules and regulations, management’s attention may be diverted from other business concerns, which could adversely affect our business and operating results. To comply with these requirements, we may need to hire more employees in the future or engage outside consultants, which would increase our costs and expenses. We may be unable to comply despite such efforts. Any failure to comply with applicable regulations could adversely affect our ability make accurate and timely financial and other disclosures to investors, attract and maintain key personnel and investors, and use our funds for intended purposes. It may also subject us to the risk of litigation or regulatory enforcement actions against us.

***We have identified material weaknesses in our internal control over financial reporting and deficiencies in our disclosure controls and procedures, that, if not properly remediated, could adversely affect our business and results of operations.***

A material weakness is a deficiency, or a combination of deficiencies, in internal control over financial reporting such that there is a reasonable possibility that a material misstatement of our annual or interim financial statements will not be prevented or detected on a timely basis. As described in “Item 9A. Controls and Procedures,” we have concluded that our internal control over financial reporting was ineffective as of December 31, 2022 due to material weaknesses in our internal control over financial reporting. The identified material weaknesses related to lack of segregation of duties

Page 22 of 91

#### Table of Contents

We have also concluded that our disclosure controls and procedures were ineffective as of December 31, 2022, in part due to the material weaknesses in our internal control over financial reporting, and in part due to limited accounting and finance personnel, lack of segregation of duties,

As further described in “Item 9A. Controls and Procedures,” we intend to take the necessary steps to remediate these material weaknesses and deficiencies. However, we were unable to resolve these matters during our 2022 fiscal year and cannot assure you that we will be successful in implementing effective internal control over financial reporting and disclosure controls and procedures during 2023 or that, once implemented, such controls will remain effective.

Implementing any further changes to our internal and disclosure controls may distract our officers and employees and entail material costs to implement new processes and/or modify our existing processes. Moreover, these changes do not guarantee that we will be effective in maintaining the adequacy of our internal and disclosure controls, and any failure to maintain that adequacy, or consequent inability to produce accurate financial statements and other required disclosures on a timely basis, could harm our business. In addition, investors’ perceptions that our internal and disclosure controls are inadequate or that we are unable to produce accurate financial statements and other disclosures on a timely basis may harm the price of our common stock.

***We may be unable to comply with NYSE American continued listing standards and our common stock may be delisted from the NYSE American market, which would likely cause the liquidity and market price of the common stock to decline.***

Our common stock is currently listed on the NYSE American. We are subject to the continued listing criteria of the NYSE American and such exchange will consider suspending dealings in, or delisting, securities of an issuer that does not meet its continued listing standards. We may not be able to satisfy these requirements. In the past, NYSE American has notified us of certain alleged violations by our company of the NYSE American continued listing requirements. In addition, subsequent to our most recent fiscal year end, we determined that one of the members of our Board’s Audit Committee, Joseph Bardswich, did not satisfy the SEC and NYSE American independence requirements applicable to an Audit Committee member, because he was concurrently receiving compensation for serving as our geologic and investor relations consultant. We believe that we have regained compliance with the Audit Committee independence requirements by replacing Mr. Bardswich with Dr. Aguirre on the Audit Committee. However, we cannot assure you that our past deficiencies will not affect the continued listing of our common stock on the NYSE American.

In order to maintain our NYSE American listing, we must maintain certain objective standards, such as corporate governance requirements, share prices, shareholders’ equity, market capitalization and, share distribution targets. In addition to objective standards, the NYSE American may delist the securities of any issuer, among other reasons, if the issuer sells or disposes of principal operating assets, ceases to be an operating company or has discontinued a substantial portion of its operations or business for any reason or the NYSE American otherwise determines that the securities are unsuitable for continued trading. We may not be able to satisfy these standards and remain listed on the NYSE American.

A delisting of our common stock could also adversely affect our reputation, ability to raise funds through the sale of equity or securities convertible into equity and the terms of any such fundraising, the liquidity and market price our common stock and the ability of broker-dealers to purchase the common stock.

***We face substantial governmental regulation, including the Mine Safety and Health Act, various environmental laws and regulations and the 1872 Mining Law.***

Our business is subject to extensive U.S. and foreign federal, state, and local laws and regulations governing environmental protection, natural resources, prospecting, development, production, post-closure reclamation, taxes, labor standards and occupational health and safety laws and regulations, including mine safety, toxic substances and other matters. The costs associated with compliance with such laws and regulations are substantial. Possible future laws and regulations, or more restrictive interpretations of current laws and regulations by governmental authorities, could cause additional expense, capital expenditures, restrictions on or suspensions of operations and delays in the development of new properties.

Page 23 of 91

#### Table of Contents

U.S. surface and underground mines like those at our Preston Operations are inspected at least quarterly by MSHA, which inspections often lead to notices of violation under the Mine Safety and Health Act. Our facilities or mines at Preston Idaho could be subject to a temporary or extended shutdown as a result of a violation alleged by MSHA.

Some mining laws prevent mining companies that have been found to (i) have engaged in environmentally-harmful conduct or (ii) be responsible for environmentally-harmful conduct engaged in by affiliates or other third parties, including in other jurisdictions, from maintaining current or obtaining future permits until remediation or restitution has occurred. If we are found to be responsible for any such conduct, our ability to operate existing projects or develop new projects might be impaired until we satisfy costly conditions.

We cannot assure you that we will at all times be in compliance with applicable laws, regulations and permitting requirements. Failure to comply with applicable laws, regulations and permitting requirements may result in lawsuits or regulatory actions, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, which may require corrective measures including capital expenditures, installation of additional equipment or remedial actions. Any one or more of these liabilities could have a material adverse impact on our financial condition.

In addition to existing regulatory requirements, legislation and regulations may be adopted, regulatory procedures modified, or permit limits reduced at any time, any of which could result in additional exposure to liability, operating expense, capital expenditures or restrictions and delays in the mining, production or development of our properties. Mining accidents and fatalities or toxic waste releases, whether or not at our mines or related to metals mining, may increase the likelihood of additional regulation or changes in law or enhanced regulatory scrutiny. In addition, enforcement or regulatory tools and methods available to regulatory bodies such as MSHA or the U.S. Environmental Protection Agency (“EPA”), which have not been or have infrequently been used against us or the mining industry, in the future could be used against us or the industry in general.

From time to time, the U.S. Congress considers proposed amendments to the 1872 Mining Law, which governs mining claims and related activities on federal lands. The extent of any future changes is not known and the potential impact on us as a result of U.S. Congressional action is difficult to predict. Changes to the 1872 Mining Law, if adopted, could adversely affect our ability to economically develop mineral reserves on federal lands. For example, in 2021 the U.S. Congress debated imposing royalties on minerals extracted from federal lands. Although legislation was not passed as of the date of this report, it is possible that in the future royalties or taxes will be imposed on mining operations conducted on federal land, which could adversely impact our financial results.

***Our operations are subject to complex, evolving and increasingly stringent environmental laws and regulations. Compliance with environmental regulations, and litigation based on such regulations, involves significant costs and can threaten existing operations or constrain expansion opportunities.***

Our operations, both in the United States and internationally, are subject to extensive environmental laws and regulations governing wastewater discharges; remediation, restoration and reclamation of environmental contamination; the generation, storage, treatment, transportation and disposal of hazardous substances; solid waste disposal; air emissions; protection of endangered and protected species and designation of critical habitats; mine closures and reclamation; and other related matters. In addition, we must obtain regulatory permits and approvals to start, continue and expand operations. New or revised environmental regulatory requirements are frequently proposed, many of which result in substantially increased costs for our business.

Page 24 of 91

#### Table of Contents

Our U.S. operations are subject to the Clean Water Act, which requires permits for certain discharges into waters of the United States. Such permitting has been a frequent subject of litigation and enforcement activity by environmental advocacy groups and the EPA, respectively, which has resulted in declines in such permits or extensive delays in receiving them, as well as the imposition of penalties for permit violations. In 2015, the regulatory definition of “waters of the United States” that are protected by the Clean Water Act was expanded by the EPA, thereby imposing significant additional restrictions on waterway discharges and land uses. However, in 2018, implementation of the relevant rule was suspended for two years, and in December 2019 a revised definition that narrows the 2015 version was implemented. In late 2021, the EPA and US Army Corps of Engineers proposed to revise the definition again, moving it back to its more inclusive, pre-2018 definition. If this rule change were to take effect or states take action to address a perceived fall-off in protection under the Clean Water Act, litigation involving water discharge permits could increase, which may result in delays in, or in some instances preclude, the commencement or continuation of development or production operations. Enforcement actions by the EPA or other federal or state agencies could also result. Adverse outcomes in lawsuits challenging permits or failure to comply with applicable regulations or permits could result in the suspension, denial, or revocation of required permits, or the imposition of penalties, any of which could have a material adverse impact on our cash flows, results of operations, or financial condition. See *Note 12* of *Notes to Consolidated Financial Statements.*

Some of the mining wastes from our U.S. mines currently are exempt to a limited extent from the extensive set of EPA regulations governing hazardous waste under the Resource Conservation and Recovery Act (“RCRA”). If the EPA were to repeal this exemption, and designate these mining wastes as hazardous under RCRA, we would be required to expend additional amounts on the handling of such wastes and to make significant expenditures to construct hazardous waste storage or disposal facilities. In addition, if any of these wastes or other substances we release or cause to be released into the environment cause or has caused contamination in or damage to the environment at a U.S. mining facility, that facility could be designated as a “Superfund” site under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (“CERCLA”). Under CERCLA, any present owner or operator of a Superfund site or the owner or operator at the time of contamination may be held jointly and severally liable regardless of fault and may be forced to undertake extensive remedial cleanup action or to pay for the cleanup efforts. The owner or operator also may be liable to federal, state and tribal governmental entities for the cost of damages to natural resources, which could be substantial. Additional regulations or requirements also are imposed on our tailings and waste disposal areas in Alaska under the federal Clean Water Act. See *Note 12* of *Notes to Consolidated Financial Statements.*

Legislative and regulatory measures to address climate change and greenhouse gas emissions are in various phases of consideration. If adopted, such measures could increase our cost of environmental compliance and also delay or otherwise negatively affect efforts to obtain permits and other regulatory approvals with regard to existing and new facilities. Proposed measures could also result in increased cost of fuel and other consumables used at our operations.

Adoption of these or similar new environmental regulations or more stringent application of existing regulations may materially increase our costs, threaten certain operating activities and constrain our expansion opportunities.

Some of our facilities are located in or near environmentally sensitive areas such as salmon fisheries, endangered species habitats, wilderness areas, national monuments and national forests, and we may incur additional costs to mitigate potential environmental harm in such areas.

Laws in the U.S. such as CERCLA and similar state laws may expose us to joint and several liability or claims for contribution made by the government (state or federal) or private parties. Moreover, exposure to these liabilities arises not only from our existing but also from closed operations, operations sold to third parties, or operations in which we had a leasehold, joint venture, or other interest. Because liability under CERCLA is often alleged on a joint and several basis against any property owner or operator or arranger for the transport of hazardous waste, and because we have been in operation since 1969 1891, our exposure to environmental claims may be greater because of the bankruptcy or dissolution of other mining companies which may have engaged in more significant activities at a mining site than we but which are no longer available for governmental agencies or other claimants to make claims against or obtain judgments from. Similarly, there is also the potential for claims against us based on agreements entered into by certain affiliates and predecessor companies relating to the transfer of businesses or properties, which contained indemnification provisions relating to environmental matters. In each of the types of cases described in this paragraph, the government (federal or state) or private parties could seek to hold the Company liable for the actions of their subsidiaries or predecessors.

Page 25 of 91

#### Table of Contents

The laws and regulations, changes in such laws and regulations, and lawsuits and enforcement actions described in this risk factor could lead to the imposition of substantial fines, remediation costs, penalties and other civil and criminal sanctions against us. Further, substantial costs and liabilities, including for restoring the environment after the closure of mines, are inherent in our operations. There is no assurance that any such law, regulation, enforcement or private claim, or reclamation activity, would not have a material adverse effect on our financial condition, results of operations or cash flows.

We are required by U.S. federal and state laws and regulations and by laws and regulations in the foreign jurisdictions in which we operate to reclaim our mining properties. The specific requirements may change and vary among jurisdictions, but they are similar in that they aim to minimize long term effects of exploration and mining disturbance by requiring the control of possible deleterious effluents and re-establishment to some degree of pre-disturbance land forms and vegetation. In some cases, we are required to provide financial assurances as security for reclamation costs, which may exceed our estimates for such costs. Conversely, our reclamation costs may exceed the financial assurances in place and those assurances may ultimately be unavailable to us.

The EPA and other state, provincial or federal agencies may also require financial assurance for investigation and remediation actions that are required under settlements of enforcement actions under CERCLA or equivalent state regulations. Currently there are no financial assurance requirements for active mining operations under CERCLA, and a lawsuit filed by several environmental organizations which sought to require the EPA to adopt financial assurance rules for mining companies with active mining operations was dismissed by a federal court. In the future, financial assurance rules under CERCLA, if adopted, could be financially material and adverse to us.

***We are required to obtain governmental permits and other approvals in order to conduct mining operations.***

In the ordinary course of business, mining companies are required to seek governmental permits and other approvals for continuation or expansion of existing operations or for the commencement of new operations. Obtaining the necessary governmental permits is a complex, time-consuming and costly process. The duration and success of our efforts to obtain permits are contingent upon many variables not within our control. Obtaining environmental permits, including the approval of reclamation plans, may increase costs and cause delays or halt the continuation of mining operations depending on the nature of the activity to be permitted and the interpretation of applicable requirements established by the permitting authority. Interested parties, including governmental agencies and non-governmental organizations or civic groups, may seek to prevent issuance of permits and intervene in the process or pursue extensive appeal rights. Past or ongoing violations of laws or regulations involving obtaining or complying with permits could provide a basis to revoke existing permits, deny the issuance of additional permits, or commence a regulatory enforcement action, each of which could have a material adverse impact on our operations or financial condition. In addition, evolving reclamation or environmental concerns may threaten our ability to renew existing permits or obtain new permits in connection with future development, expansions and operations. We cannot assure you that all necessary approvals and permits will be obtained and, if obtained, that the costs involved will not exceed those that we previously estimated. It is possible that the costs and delays associated with the compliance with evolving standards and regulations could become such that we would not proceed with a particular development or operation.

We are often required to post surety bonds or cash collateral to secure our reclamation obligations and we may be unable to obtain the required surety bonds or may not have the resources to provide cash collateral, and the bonds or collateral may not fully cover the cost of reclamation and any such shortfall could have a material adverse impact on our financial condition. Further, when we use the services of a surety company to provide the required bond for reclamation, the surety companies often require us to post collateral with them, including letters of credit. In the event that we are unable to obtain necessary bonds or to post sufficient collateral, we may experience a material adverse effect on our operations or financial results.

***New federal and state laws, regulations and initiatives could impact our operations.***

In recent years there have been several proposed or implemented ballot initiatives that sought to directly or indirectly curtail or eliminate mining in certain states including Montana. While a water treatment initiative in Montana was defeated by voters in November 2018, in the future similar or other initiatives that could impact our operations may be on the ballot in these states or other jurisdictions (including local or international) in which we currently or may in the future operate. To the extent any such initiative was passed and became law, there could be a material adverse impact on our financial condition, results of operations or cash flows.

Page 26 of 91

#### Table of Contents

### We cannot guarantee title to all of our properties.

We cannot guarantee title to all of its properties as the properties may be subject to prior mineral rights applications with priority, prior unregistered agreements or transfers or indigenous peoples' land claims, and title may be affected by undetected defects. Certain of the mineral rights held by us are held under applications for mineral rights or are subject to renewal applications and, until final approval of such applications is received, our rights to such mineral rights may not materialize and the exact boundaries of the Company's properties may be subject to adjustment. For our operations in Mexico, we hold mining claims, mineral concession titles and mining leases that are obtained and held in accordance with the laws of the country, which provide the Company the right to exploit and explore the properties. The validity of the claims, concessions and leases could be uncertain and may be contested. Although we have conducted title reviews of our property holdings, title review does not necessarily preclude third parties (including governments) from challenging our title. In accordance with mining industry practice, we do not generally obtain title opinions until we decide to develop a property. Therefore, while we have attempted to acquire satisfactory title to our undeveloped properties, some titles may be defective. We do not maintain title insurance on our properties.

***There is uncertainty as to the termination and renewal of our mining concessions.***

Under the laws of Mexico, mineral resources belong to the state and government. Therefore, concessions are required in both countries to explore or exploit mineral reserves. In Mexico, our mineral rights derive from concessions granted, on a discretionary basis, by the Ministry of Economy, pursuant to Mexican mining law and regulations thereunder.

Mining concessions in Mexico may be terminated if the obligations of the concessioner are not satisfied. In Mexico, we are obligated, among other things, to explore or exploit the relevant concession, to pay any relevant fees, to comply with all environmental and safety standards, to provide information to the Ministry of Economy and to allow inspections by the Ministry of Economy. Any termination or unfavorable modification of the terms of one or more of our concessions, or failure to obtain renewals of such concessions subject to renewal or extensions, could have a material adverse effect on our financial condition and prospects.

***Mexican economic and political conditions, as well as drug-related violence, may have an adverse impact on our business.***

The Mexican economy is highly sensitive to economic developments in the United States, mainly because of its high level of exports to this market. Other risks in Mexico are increases in taxes on the mining sector and higher royalties, such as those enacted in 2013. As has occurred in other metal producing countries, the mining industry may be perceived as a source of additional fiscal revenue.

In addition, public safety organizations in Mexico are under significant stress, as a result of drug-related violence. This situation creates potential risks, particularly for transportation of minerals and finished products, which may affect a small portion of our production. Drug-related violence has had a limited impact on our operations, as it has tended to concentrate outside of our areas of production. The potential risks to our operations might increase if the violence spreads to our areas of production.

Because we have significant operations in Mexico, we cannot provide any assurance that political developments and economic conditions, including any changes to economic policies or the adoption of other reforms proposed by existing or future administrations in Mexico, or the advent of drug-related violence in the country, will have no material adverse effect on market conditions, the prices of our securities, our ability to obtain financing, our results of operations or our financial condition.

***Mexican inflation, restrictive exchange control policies and fluctuations in the peso exchange rate may adversely affect our financial condition and results of operations.***

Although all of our Mexican operations’ sales of metals are priced and invoiced in U.S. dollars, a substantial portion of its costs are denominated in pesos. Accordingly, when inflation in Mexico increases without a corresponding depreciation of the peso, the net income generated by our Mexican operations is adversely affected. Inflation in Mexico was 7.8% in 2022, 7.4% in 2021 and 3.2% in 2020. The value of the peso appreciated by 5.9% against the U.S. dollar in 2022 after depreciating by 3.2% and 5.9% in 2021 and 2020 respectively. The peso has been subject in the past to significant volatility, which may not have been proportionate to the inflation rate and may not be proportionate to the inflation rate in the future.

Currently, the Mexican government does not restrict the ability of Mexican companies or individuals to convert pesos into dollars or other currencies. While we do not expect the Mexican government to impose any restrictions or exchange control policies in the future, it is an area we closely monitor. We cannot assure you the Mexican government will maintain its current policies with regard to the peso or that the peso’s value will not fluctuate significantly in the future. The imposition of exchange control policies could impair our ability to obtain imported goods and to meet its U.S. dollar-denominated obligations and could have an adverse effect on our business and financial condition.

Page 27 of 91

#### Table of Contents

## Properties

As filed, 33,791 characters.

### OVERVIEW

Our material properties are:

- Our antimony smelter and precious metals plant in Montana;
- Our Los Juarez antimony mining property and the associated Madero smelter and Puerto Blanco flotation mill in Mexico; and
- Our Bear River zeolite mining property and the associated \[plant\] in Idaho.

We also have the following properties that we do not consider material:

- A house in Preston, Idaho, which is used to house workers from our zeolite operation; and
- Our corporate office located in Thompson Falls, Montana.

We have a 100% ownership or leasehold interest in each of these properties, except as noted above.

Although we extract minerals from the Los Juarez antimony property and the Bear River zeolite property that we later process and sell, S-K 1300 classifies each of our mining properties as an exploration stage property and our company as an exploration stage issuer because we have not prepared a technical report summary for any of our properties making a determination that the property contains proven and probable mineral reserves.

The aggregate annual extraction from our mining properties during the three most recently completed fiscal years was as follows:

| WADLEY MINES YEAR | DRY WEIGHT (lbs.) | ANTIMONY CONTENT (lbs.) |
| --- | ---: | ---: |
| 2020 | 885,040 | 281,653 |
| 2021 | 1,112,389 | 353,161 |
| 2022 | 1,186,294 | 301,901 |
| LOS JUAREZ PROPERTY YEAR | DRY WEIGHT (metric tons) | ANTIMONY CONTENT (metric tons) |
| 2020 | 0 | 0 |
| 2021 | 1500 | 9 |
| 2022 | 500 | 3 |
| BEAR RIVER ZEOLITE YEAR | DRY WEIGHT (metric tons) |  |
| 2020 | 12,748 |  |
| 2021 | 11,747 |  |
| 2022 | 13,047 |  |

In addition to mineralized material extracted from our properties, our processing facilities process mineralized material extracted by the Company from third party properties such as Wadley and Sierra Guadalupe, or purchased from third parties, or provided to us for toll milling.

### MATERIAL PROPERTIES

### Antimony Smelter and Precious Metals Plant, Montana

Our antimony smelter and precious metals plant is located in the Burns Mining District, Sanders County, Montana, approximately 14 miles west of Thompson Falls on Montana Highway 471, GPS coordinates 47.54735, -115.59219.\] This highway is asphalt, and the property is accessed by cars and trucks. The property includes two five-acre patented mill sites that are owned in fee-simple by us. The claims are U. S. Antimony Mill Site No. 1 (Mineral Survey 10953) and U. S. Antimony Mill Site No. 2 (Mineral Survey 10953). We also own five-acre Black Jack millsite.

Page 28 of 91

#### Table of Contents

Page 29 of 91

#### Table of Contents

The U. S. Antimony Mill Sites were used to run a flotation mill and processing plant for antimony that we mined on adjacent claims that have been sold. Presently, we run a smelter that includes furnaces of a proprietary design to produce antimony metal, antimony oxide, and various other products. We also run a precious metals plant. The facility includes 6 buildings and our main office. There are no plans to resume mining on the claims that have been sold or abandoned, although the mineral rights have been retained on many of the patented mining claims. Accordingly, we do not view the smelter and plant as a mining property for purposes of S-K 1300. It is a processing facility only. The mill site is serviced with three-phase electricity from Northwest Power, and water is pumped from a well.

We claim no reserves nor mineral resources on any of these properties.

Antimony mining and milling operations in the U.S. were curtailed during 1983 due to continued declines in the price of antimony. We are currently purchasing foreign raw antimony materials and extracting our own raw materials from our properties in Mexico. We continue to produce antimony metal, oxide, sodium antimonate, antimony trisulfide, and precious metals from our processing facility near Thompson Falls, Montana.

The facility at Thompson Falls MT is outfitted with 6 operational Small Rotary Furnaces (SRF’s) and permitted for 9 SRF’s. The SRF’s are used to roast various antimony raw material inputs and are capable of producing either finished antimony oxide or finished antimony metal in the form of ingots. The equipment is maintained to modern standards. The facility also has 2 operational electric furnaces and permitted for 4 for the purpose of the production of antimony trisulfide. These furnaces are modern and maintained. The facility also has a small laboratory and various equipment for the treatment and production of precious metal bullion. The facility houses modern quality-control equipment.

Page 30 of 91

#### Table of Contents

There are no material encumbrances

The book value of the property as of December 31, 2022 is $1,667,758.

### Mexican Properties

### Los Juarez Antimony Property, Mexico

Our Los Juarez property does not contain known mineral reserves; however, in 2019 we commenced extraction via open pit mining. However, extraction was halted in 2020 and the Company elected to conduct several rounds of geological study in addition to shipping a previously mined 2,000 metric ton test-batch to our flotation facility. Further study is ongoing and depending upon the results of these studies the Company will decide what course of action to take.

### Location

**GPS coordinates of the center of the Los Juarez property are 20.86528, -99.67590.**

Page 31 of 91

#### Table of Contents

### Transportation

The Los Juarez Property is located in the state of Queretaro Mexico and is approximately 40 kms by road from the town of Vizzaron. It is located within 4 kms of the ejido of Los Juarez situated near the top of the mountain. The property is accessible by truck by paved road except for the last 4 kms which is a dirt road made by the Company.

### Property and Ownership

### The Los Juarez property consists of:

1\. San Miguel I and II, which were purchased by a USAC subsidiary, Antimonio de Mexico, S. A. de C. V (“ADM”), for $1,480,500, which was paid in full as of December 31, 2018. The property consists of 40 hectares (100 acres); \[

2\. San Juan I and II, which are concessions owned by ADM and include 466 hectares (1,152 acres); and

3\. The San Juan III mining concession, which is held by a lease agreement by ADM in which we will pay a 10% royalty, based on the net smelter returns from another USAC Mexican subsidiary, named United States Antimony Mexico, S. A. de C. V. or USAMSA. It consists of 214 hectares (529 acres).We are leasing just the concessions for $1,000 US dollars/month.

The concessions collectively constitute 720 hectares (1,780 acres). The claims are accessed by roads that lead to highways.

The book value of the property, including the plant and smelter, as of December 31, 2022 is $6,825,404.

Page 32 of 91

#### Table of Contents

### History

Part of the USAC Mexican property, including San Miguel I, II and part of San Juan III, was originally drilled by the Penoles Company in 1970, when antimony metal prices were high. They did not proceed with the property, due to the complex metallurgy of antimony. Subsequently, the Mexican Government did additional work and reported a deposit of mineralized material in Consejo de Recursos Minerales. The report predated S-K 1300. The Company has not prepared a S-K 1300 report, nor has it declared any proven and probable mineral reserves on the property.

### Geology

The mineralized zone is a classic jasperoid-type deposit in the Cretaceous El Doctor Limestone. The mineralization is confined to silicified jasperoid pipes intruded upwards into limestone. The zone strikes north 70 degrees west. The dimension of the deposit is still conjectural. However, the strike length of the jasperoid is more than 3,500 meters.

The mineralization is typically very fine-grained stibnite with silver and gold. It is primarily sulfide in nature due to its encapsulation in silica.

### Permitting and Licensing

USAC via its subsidiaries with properties in Mexico pays Mexican mining taxes on all the mining concession it owns. The taxes average approximately 7,000 pesos per semester and are paid in a timely manner. The Company is unaware of any violations or fines regarding the retention of these mining claims nor is the Company in violation regarding permitting, timelines, or conditions.

Page 33 of 91

#### Table of Contents

### Exploration

In October 2020, a 1000-meter initial drill program was conducted on the property with a total of 25 holes. The drilling was completed November 2020 and used a reverse-circulation drill rig. Samples were sent to a certified lab in Mexico for analysis. Drill hole location, depth, and angle were selected near mined pit areas and along suspected fault zones. A summary of the drill program was published in a news release of November 30, 2020 and subsequent news releases. This initial program was performed without the aid of a geophysical study. In 2022, the Company was engaged in a formal geological, geochemical, and geophysical study to help obtain subsurface mineralization data and better understand the system with an objective of partnering with a junior mining company with expertise in exploration/drilling. The results of the geological and geochemical studies are not yet complete.

### Mining Methods

Mining of the Los Juarez has been halted pending our geological, geophysical, and geochemical studies which are ongoing and nearing completion. Additional mapping and geologic work is required to adequately evaluate the data collected thus far. If the Company should elect to reinitiate mining of the Los Juarez property, it will likely employ standard open-pit techniques and depending on the geologic results, underground methods.

### Infrastructure

There is an excavator, an older Cat D-6, a gas welder/generator, a small break shack, an explosives magazine, and these are all functional.

### USAMSA Puerto Blanco Flotation Mill, Guanajuato, Mexico

The flotation facility known as Puerto Blanco, is located approximately 15 kms north of the city of San Jose Iturbide along state highway 57 in the state of Guanjuato Mexico. It is accessible by highway to all vehicles. The GPS coordinates of Puerto Blanco are 21.07827,-100.54144 (see attached map with Mexican installations listed). Puerto Blanco is located approximately 144 kms from the Los Juarez property. The Puerto Blanco property was purchased by USAMSA in 2012 and is approximately 40 hectares in area. The flotation plant has a capacity of 100 metric tons per day. It includes a 30” x 42” jaw crusher, a 4’x 8’ double-deck screen, a 36” cone crusher, an 8’x 36” Harding type ball mill, and eight No. 24 Denver sub A type flotation machines, an 8’ disc filter, front end loaders, tools and other equipment. The flotation circuit is used for the processing of rock from Los Juarez and other properties. The crushing equipment currently in place is adequate for both flotation mills. An oxide circuit was added to the plant in 2013 and 2014 to mill oxide ores from Los Juarez and other properties. It includes a vertical shaft impactor, 3 ore bins, 8 conveyors, a 4’ x 6’ high frequency screen, jig, 8 standard concentrating tables, 5 pumps, sand screw and two buildings. The capacity of the oxide circuit is 50 tons per day. We have installed a cyanide leach circuit and settling pond that will be used to recover precious metals from our Los Juarez mine. In 2019 a cyanide leach circuit for recovery of gold was built and permits were obtained for this circuit. Test batches of Los Juarez antimony concentrates containing precious metals have been processed through the cyanide leach system and the processing of 2,000 tons of mined rock from Los Juarez is underway. One of three batches of gold-bearing carbon (the end product of the cyanide leach) have been saturated and awaits separation and analysis. Preliminary results are that the gold-recovery is acceptable.

Page 34 of 91

#### Table of Contents

Page 35 of 91

#### Table of Contents

### USAMSA Madero Smelter, Estacion Madero, Parras De La Fuente, Coahuila, Mexico

The Madero smelter is located about 7 kms north of the gas station known as Paila Coahuila. It is located less than 1 km from railroad and the ejido Estacion Madero, Coahuila. Paila is about halfway in between Torreon and Saltillo both in the state of Coahila on state highway 40 and is accessible by pickup truck. USAC, through its wholly owned subsidiary, USAMSA, owns and operates a smelting facility at Estacion Madero, in the Municipio of Parras de la Fuente, Coahuila, Mexico. The property includes 13.48 hectares (30 acres). Seventeen small rotating furnaces (“SRF’s”) and four large rotating furnaces (“LRF”) with an associated stack and scrubbers. Other equipment includes cooling ducting, dust collectors, scrubber, laboratory, warehouse, slag vault, stack, jaw crusher, screen, hammer mill, and a 3.5’ x 8’ rod mill. The plant has a feed capacity of 14-25 metric tons of direct shipping ore per day, depending on the grade of the feedstock. If the feedstock is in the range of 45% antimony or higher, the smelter could produce as much as 10MM pounds of contained antimony annually. Concentrates from our flotation plant, and hand-sorted ore from Mexico sources and other areas, are being processed. In 2019, we completed the installation of a caustic leach circuit to process concentrates from the Puerto Blanco cyanide leach plant containing precious metals from our Los Juarez Mining property. The Madero production is either sold as metal to customers directly or crude oxide shipped to our Montana plant to produce finished antimony products and precious metals. Plans to dramatically improve and update the infrastructure at the Madero Smelter include erecting a building around all the furnaces to aid in the control, consistency, and quality of product and ease of processing. Additionally, the Company is considering producing finished antimony oxide with this control and purchasing quality-control instrumentation for the option of selling all finished antimony products from Madero just as we currently do in Montana. We have used part of our 2021 capital raise for improving equipment, relining furnaces, purchase of newer forklifts, scales, and general improvement. The Company is focusing its capital expenditures for the improvement of the facilities and Preston Idaho for its zeolite operation and secondary to this priority will be the potential enclosure of our smelter at Madero in order to allow improved recovery, efficiency, and quality-control by shielding it from the weather. Access to the plant is by road and railroad. Set forth below are location maps:

Page 36 of 91

#### Table of Contents

### Other Infrastructure

Electricity is supplied by CFE, the socialized electricity provider in Mexico and provides adequate and fairly reliable power. Water is sourced from a well at the smelter that was drilled by USAC many years ago. Personnel is sourced, principally, from the local ejido, population approximately 100 people.

Page 37 of 91

#### Table of Contents

Page 38 of 91

#### Table of Contents

Page 39 of 91

#### Table of Contents

### Bear River Zeolite Property, Idaho

Our zeolite property does not contain known mineral reserves; however, we have commenced extraction via open pit mining.

### Location

This property is located in the southeast corner of Idaho, approximately seven miles east of Preston, Idaho, 34 miles north of Logan, Utah, 79 miles south of Pocatello, Idaho, and 100 miles north of Salt Lake City, Utah

The mine is located in the N ½ of section 10 and the W ½ of section 2, section 3, and the E ½ section 4, Township 15, Range 40 East of the Boise Meridian, Franklin County, Idaho. The plant and the initial pit are located on the Webster Farm, L.L.C., which is private land. The plant has GPS coordinates of 42.14419, -111.77574.

### Transportation

The property is accessed by seven miles of paved road and about l/4 mile of gravel road from Preston, Idaho. Preston is near the major north-south Interstate Highway 15 to Salt Lake City or Pocatello. Preston is a city in Franklin County, Idaho, United States. The population was 5,204 according to the 2010 United States census. The city is approximately 7 miles north of the Utah border and the nearest large city is Logan, UT which is located approximately 20 miles south of Preston.

Several Union Pacific rail sidings may be available to the mine. Bonida is approximately 25 miles west of the mine via paved roads and includes acreage out of town where bulk rock could be stored, possibly in existing silos or on the ground. Three-phase power is installed at this abandoned site. Finished goods can also be shipped from the Franklin County Grain Growers feed mill in the town of Preston on the Union Pacific Railroad.

The Burlington Northern Railroad can be accessed at Logan, Utah.

Location Map

Page 40 of 91

#### Table of Contents

### Property and Ownership

Bear River Zeolite leases 320 acres from the Webster Farm, L.L.C. The term of the lease is 15 years and it began on March 1, 2010. This includes the mill site and zeolite in the area of the open pit. The property is the NW ¼ and W ½ of the SW ¼ of section 3 and the N ½ of the W ¼ of section 10, Township 15 South, Range 40 East of the Boise Meridian, Franklin County, Idaho. The lease requires a payment of $10.00 per ton plus an additional annual payment of $10,000 on March 1st of each year. In addition, there are two other royalty holders. Nick Raymond and the estate of George Desborough each have a graduated royalty of $1.00 per ton to $5.00 per ton, depending on the sale price. Delaware LLC holds a royalty interest based on 3% of net sales (sales minus freight. In early 2021, Joe Bardswich a director and geologist, was able to renegotiate one of the royalty payments so that escalation due to the Consumer Price Index (CPI) that existed in the original contract was removed. The Consumer Price Index (CPI) is a measure of the average change over time in the prices paid by urban consumers for a market basket of consumer goods and services. Indexes are available for the U.S. and various geographic areas.

The balance of the property is on Bureau of Land Management property and includes 480 acres held by 24, 20-acre Placer claims. Should we drop our lease with Webster Farms LLC., we will retain these placer claims.

The book value of the property, including the plant, as of December 31, 2022 is $2,837,666.

### History

The plant had no prior history as it was built by founder John Lawrence and other U.S. Antimony personnel.

### Geology

The deposit is a very thick, sedimentary deposit of zeolitized volcanic ash of Tertiary age known as the Salt Lake Formation. The sedimentary interval in which the clinoptilolite occurs is more than 1,000 feet thick in the area. Thick intervals of the zeolite are separated by thin limestone and sandstone beds deposited in the freshwater lake where the volcanic ash accumulated.

The deposit includes an 800-foot mountain. Zeolite can be sampled over a vertical extent of 800 feet on more than 700 acres. The current pit covers more than 3 acres. Despite the apparent size of the deposit, we claim no reserves.

Page 41 of 91

#### Table of Contents

### Permitting and Licensing

The Company is in possession of all MSHA and operational permits and is regularly inspected and regularly performs required safety and training classes and exercises in compliance with State and Federal requirements.

### Exploration

Exploration has been limited to the examination and sampling of surface outcrops and mine faces. No exploration was performed at Bear River Zeolite during the years ended December 31, 2022 and 2021.

### Mining Methods

Depending on the location, the zeolite is overlain by 1 to 12 feet of zeolite-rich soil. On the ridges, the cover is very little, and in the draws the soil is thicker. The overburden is stripped using a tractor dozer, currently a Caterpillar D-8K. It is moved to the toe of the pit, and will eventually be dozed back over the pit for reclamation.

Although near-surface rock is easily ripped, it is more economical to drill and blast it. Breakage is generally good. Initial benches are 20 feet high, and each bench is accessed by a road.

Haulage is over approximately 4,000 feet of road on an uphill grade of 2.5% to the mill. On higher benches, the grade will eventually be downhill. Caterpillar 769 B rock trucks are being used. The trucks haul 18 to 20 tons per load, and the cycle time is approximately 30 minutes.

In 2021, we experimented with mining principally by ripping using the Caterpillar D-9. This method worked but rendered rock that sometimes had to be drilled and broken in order to fit in the jaw crusher bin at the mill. Consequently, the Company is certain that blasting is the preferred method of mining. We may elect to supplement mining extraction by updating our D-9 with a secondary ripper.

With the trucks and the other existing equipment, the mine is capable of extracting 80 tons per hour.

### Infrastructure

The plant at Bear River Zeolite, in overview, has 7 distinct and important parts: 1. Mining pit, explosives, mining equipment and hauling, 2. Primary crushing, 3. Secondary crushing, 4. Raymond mill crushing, 5. Screening/size selection, 6. Packaging, 7. Office and delivery/trucking.

The majority of equipment at the plant has been updated and/or improved and this process of updating equipment is still underway. In 2021, the Jaw crusher was replaced with a better one. In December of 2022, the cone crusher was replaced with a new, modern cone that has a number of safety features preventing or greatly reducing the likelihood of failure. The plant currently employs 25 people, 74% of whom work in packaging. Starting in 2022, extensive improvement of the plant equipment commenced including the elimination of spill points, the improvement in bins, conveyors, chutes, bibs, bearings, dust-control, screens, feed rates, control, personnel, and management.

The primary crushing circuit is a conventional closed circuit, utilizing a Stephens-Adamson 42” x 12’ apron feeder, Pioneer 30” x 42” jaw crusher, a Sepro 2.5 foot modern cone crusher, a 5’ by 12’ double deck Kohlberg screen, and has a self-cleaning dust collector. The rock is crushed to minus 1 inch and the circuit has a rated capacity of more than 50 tons per hour.

In Oct/Nov 2021 the primary jaw crusher pitman arm broke due to incorrect greasing procedures. A replacement jaw crusher was purchased, delivered, installed and began operations 1.5 months after delivery. A delivery chute was designed and fabricated along with necessary bins and skirting. The new jaw crusher was outfitted with a hydraulic hand-pump greaser for the main pitman-arm assembly and the correct grease and greasing procedure has been implemented. Plans to fix or replace the old jaw crusher exist but require a major refit. The Company was able to repair the engine on its crane, a Linkbelt 3-stage boom crane of about 50-ton nameplate capacity. The transmission is now being repaired. With this crane, the Company will pull the old jaw crusher and determine if it is salvageable. In any case, the Company has earmarked that location for an entirely new and secondary jaw crusher in the event that bulk zeolite purchase opportunities increase. In December of 2022, the old cone crusher was no longer operative and was replaced with a Sepro 2.5’ modern cone crusher outfitted with a multitude of sensors that serve to prevent failure of all primary and secondary systems. The cone’s performance and throughput was increased from 5 tons per hour to around 12 tons per hour in Q2 of 2023, afforded by the modern monitoring and control capacity of the new cone.

Page 42 of 91

#### Table of Contents

There are two lines to produce coarse products:

- Line 1 is a closed crushing circuit with a 100 HP hammer mill (that replaced the old vertical shaft impactor) and a 5 deck Midwestern Multi Vibe high frequency screen. The replacement of the Vertical Shaft Impactor (“VSI”) with the hammermill, also outfitted with a variable frequency drive, has decreased the ratio of fine-particle product to larger, higher-demand product. Two aggregate flow tests are underway that have the objective of determining if this crusher will be replaced with a different type of crusher to further optimize the efficiency/distribution of crush and production rate. A secondary concrete support form was poured under this hammermill in 2023 that aided to decrease vibration. A more efficient feed hopper was installed in March 2023 and the return conveyor rollers were replaced. Additionally, the hammers were hard-faced to increase longevity and decrease vibration by mitigating out-of-balance condition. This alteration also allowed a higher range of speeds for crushing and therefore improved throughput.
- Line 2 includes a Jeffries 30” by 24” 60 HP hammer mill that was custom-modified, in a closed circuit with two 5’ x 12’ triple deck Midwestern Multi Vibe high frequency screens. The circuits also include bucket elevators, (3) 125-ton capacity product silos, a 6-ton capacity Crust Buster blender, augers, Sweco screens, and dust collectors. Various improvements to this line were achieved in April and May of 2023 that have resulted in this line slightly out-performing Line 1. Further improvements to both lines have shown that the crushing production capacity for the entire plant has gone from around 4 tons per hour to around 12 tons per hour.

The fine products circuit is in one building and it includes two (2) 3.5’ x 10.5’ Derrick 2 deck high frequency (3,450 RPM) screens and various bucket elevators, augers, bins, and Sweco screens for handling product. Depending on the screening sizes, the plants can generate approximately 150 tons of granules and 125 tons of fines per 24-hour day.

The Raymond mill circuit includes a 6058 high-side Raymond mill with a double whizzer, dust collector, two 100-ton product silos, feed bin, conveyors, air slide, bucket elevators, and control booth. The Raymond mill has a rated capacity of more than 10 tons per hour.

Water is sourced from the land owner during the early spring and summer months. Late summer, water is generally scarcer but is obtained from same source. We use this water, along with our new water truck for dust control near the office, on the road to the mill and on the road to the mine. We have contacted 3 local well-drillers with the objective of addressing the scarcity of water during the late summer months. Electricity is provided by the local electric company and is fairly reliable. Loss of electric power is rare and all of our equipment have safety protocols as well as, in some cases, automatic safety devices in the event of loss of electrical power. Personnel is sourced, mainly from Preston, but also from North Logan and is a concern because of the availability to expand our packaging plant (74% of our labor force at Preston works in packaging). Packaging is anticipated to be our next production restriction and the Company is planning either to augment, as much as possible, its packaging with more automatic packaging equipment and is even considering the establishment of an off-site packaging plant.

### NON-MATERIAL PROPERTIES

### Soyatal

The Soyatal mining district and USAC’s interest in them has evolved since the Company’s first discovery of them. The first interest of USAC in the Soyatal properties was as an additional source of antimony. In or around the period from 2011-2019, USAC received a low amount of good-grade antimony sulfide ores that were hand-selected. However, the ore volumes were sufficiently low that around 2019-2021, the Company was ready to abdicate its purchase-agreement (the volume of ores didn’t justify the cost). In late 2021, the Company decided to initiate testing of low-grade ores from the Soyatal District for the express purpose of provision of an auxiliary source for the production of antimony trisulfide. The concentrates produced from the ores at the Soyatal District have passed the tests that specify the minimum grade and maximum contamination-content, and therefore the Company has elected to retain its interest in the Soyatal District. The District historically was a non-trivial producer of stibnite and its mining has been primarily underground. The mines are remote and near the top of mountain, making shipping of the low-grade ores one of the major concerns regarding costs. Trucking in Mexico is much more economic than in the United States and the revenue from the sale of antimony trisulfide is approximately 1.7 times per pound more than that of the sale of antimony metal. USAC’s Sierra Guadalupe property (see below) has already been approved by the United States Department of Defense (“DOD”) as a source of antimony for the production of antimony trisulfide for the U.S. military. The interest the Company has in the Soyatal is as an auxiliary source and is seeking similar approval from the DOD. The Company has earmarked the Soyatal District as a back-up source for antimony trisulfide, which is an endangered, critical mineral, used by the military and open munitions market, specifically for primers. USAC retains the mining concession claims from the Soyatal and has a contract pending for the completion of the purchase of these claims with the previous owner for $550,000 US dollars. Concurrent to this USAC continues to purchase truckloads of stibnite ore from the Soyatal that it ships to the flotation facility at Puerto Blanco where the ore is made into high-grade antimony concentrate. This concentrate is then taken to the facility in Montana for purification and sale to both the open munitions market and the DOD.

Page 43 of 91

#### Table of Contents

### Sierra Guadalupe Property

The Sierra Guadalupe property is located in the state of Zacatecas Mexico, (GPS coordinate 24.135107, -102.724499). USAC started processing dump rock from the mines at Sierra Guadalupe at its floatation plant in Puerto Blanco Guanajato approximately 10 years ago. The primary form of the geological species of antimony at these mines is very clean stibnite (no appreciable contaminants such as arsenic or lead as is common with many stibnite deposits). The initial dump rock ran about 7% antimony. The dump rock shipments halted about 2 years later when the average grade dropped below 1%. A very good (\>65% antimony) concentrate was made with the dump rock and these concentrates were then sent to Montana and processed in electric furnaces into a purified antimony trisulfide crystal form with the goal of producing antimony trisulfide for sale to the ordinance market specifically for use in primers. USAC received a grant from the Department of Defense (DOD) to work on this project. The plan was for USAC to provide the DOD with samples to be tested and to pass the requirements of the US military specifications for purity. In 2023, USAC the final sample sent to the DOD for testing was approved which constituted an official approval by the DOD to accept antimony trisulfide sourced from the Sierra Guadalupe property. The advantage of the trisulfide market is the sale price which is in the range of $(9-12)/lb. compared with much lower sale price per pound for either pure antimony metal or pure antimony trioxide

At the same time the dump rock was being shipped to Puerto Blanco, a total of about 20 tons of direct-roasting ore was sent to USAC’s smelter in Madero and was processed into antimony trioxide. The production of ore for direct smelting was limited chiefly due to mismanagement, lack of miners, lack of equipment, and poor maintenance of the principal road. However, average grade ore received at the Madero Smelter were in the neighborhood of 28% antimony and in lower quantities 45% antimony. This means that the Sierra Guadalupe may well be a significant additional source of antimony feed for the larger market of antimony and be able to provide USAC with both an approved source of antimony trisulfide as well as a source of antimony.

On August 17, 2022, the Company executed a Management and Consultancy Services Agreement (the ‘Consultancy Agreement”) whereby a contractor was engaged to render professional services consisting of management and consultancy for the acquisition of surface rights and other technical services near San Guadalupe, Mexico. The parties agreed to total consideration of $1,035,025 plus associated Value Added Tax (“VAT”). During the first quarter of 2023, the Company contacted the primary surface right holders, came to an agreement with them, and is in the process of repairing equipment, fixing the road, and negotiating with a third party for the acquisition of miners. We are also examining for grade quality additional raw materials to ship to Puerto Blanco and additional processing.

### House in Preston, Idaho

In 2021 the Company purchased a house in Preston Idaho for the purpose of attracting and retaining a full-time supervisor at its zeolite facility. The Company makes monthly payments towards the mortgage of this house. This house is occupied by the Supervisor that we obtained in 2021, Richard Lyon. As of June 30, 2023, the balance remaining on the house is $195,689 and monthly payments of $1,409 are being made.

### Corporate Office

Our corporate office is located in Thompson Falls, Montana. Mr. Gustavsen, our Chief Executive Officer, operates from this office and also works on-site at the Company’s antimony processing operation. U.S. Antimony owns the offices and all associated buildings and infrastructure at its corporate headquarters in Montana. The facility has a shop, furnace buildings, laboratory, 6 offices, and a conference room.

## Legal proceedings

As filed, 222 characters.

There is no material pending legal proceeding, other than ordinary routine litigation incidental to the business, to which we or any of our subsidiaries is a party or of which any of our or their properties is the subject.

## Management's discussion and analysis

As filed, 28,962 characters.

*The following discussion should be read in conjunction with our financial statements and related notes thereto as filed with this report.*

### SELECTED FINANCIAL DATA.

### Statement of Operations Information:

|  | For the year ended December 31, 2022 | 2021 |
| --- | ---: | ---: |
| Revenues | $11,044,707 | $7,747,506 |
| Costs of revenues | 9,048,517 | 6,908,901 |
| Gross profit | 1,996,190 | 838,605 |
| Total operating expenses | 1,647,985 | 1,498,862 |
| Income (loss) from operations | 348,205 | (660,257) |
| Other income (expense) | 96,529 | 599,788 |
| Income tax expense | (16,073) | - |
| NET INCOME (LOSS) | $428,661 | $(60,469) |
| Weighted average shares of common stock (basic) | 106,287,359 | 102,835,574 |
| Weighted average shares of common stock (diluted) | 106,287,359 | 102,835,574 |

### Balance Sheet Information:

|  | December 31, 2022 | December 31, 2021 |
| --- | ---: | ---: |
| Working capital | $19,397,489 | $21,498,138 |
| Total assets | 34,700,450 | 35,002,727 |
| Accumulated deficit | (33,070,332) | (32,711,263) |
| Stockholders’ equity | 31,869,255 | 32,368,803 |

### Overview

#### Company-wide

For the year ended December 31, 2022, the Company reported net income of $428,661 after depreciation and amortization of $909,220, compared to a net loss of $60,469 for 2021 after depreciation and amortization of $880,880.

During the year ending December 31, 2022, the most significant factors affecting our financial performance were as follows:

- A significant increase in the amount of sales of antimony, up 53% from the prior year.
- A purchase option agreement for the Wadley mines signed in June 2022 along with an 8-month mining and due diligence period providing exclusive rights to extracted mineral. Until June 2022, the Wadley mine had halted USAC’s ability to purchase ore. The purchase option agreement due diligence period has been extended to October 15, 2023.
- The continued efforts in mechanical improvements associated with sales of zeolite from Bear River Zeolite.
- Mitzi Hart’s replacement of Marilyn Sink as Plant Manager at U.S. Antimony.
- The hiring of Richard Lyon as Plant Supervisor at Bear River Zeolite along with the continued efforts in trucking coordination and sales management of Gretchen Lawrence
- Increased trucking prices and decreasing trucking availability.
- Difficulties in sourcing labor in the US and Mexico due to the Covid pandemic and government incentives resulting in a significantly smaller labor pool.
- The completion of payment and disposal for the removal of legacy slags at the smelters in Mexico and the United States.
- The sale of finished antimony ingots directly to customers from our Madero Smelting facility.
- The purchase of several large salt sheds for storage of ore at Bear River Zeolite in order to eliminate interruptions in production during winter and the wet seasons.
- The purchase of several key pieces of rolling stock equipment at Bear River Zeolite including: A Cat 235 excavator, a Cat 12H road grader, a Cat 740 articulated haul truck, a Cat D8T dozer with dual rippers.
- The purchase of a new modern 2.5-foot cone crusher to replace our older cone crusher at Bear River Zeolite.
- The construction of a 100’ by 50’ warehouse at Bear River Zeolite.

Page 46 of 91

#### Table of Contents

Our plan for 2023 is as follows:

- Continue processing the 2,000 tons of mined and shipped rock from the Los Juarez property at our Puerto Blanco flotation facility.
- Continue to process ores and concentrates at our Madero smelter facility.
- The purchase of new forklifts and scales at Madero smelter facility.
- The relining of several short rotary furnaces along with the repair of equipment at the Madero smelter facility
- The installation of two new electric furnaces at the Montana facility for increase production of antimony trisulfide.
- Additional mapping and additional geological studies at the Los Juarez property in order to ascertain more information about the mineralization indicated in our preliminary geophysical and geochemical work.
- The continued effort to source additional antimony from Honduras, Nicaragua, and especially Guatemala as well as sources in the United States, Canada, Alaska, and Mexico.
- Continuation of the mining of the Soyatal claims for the production of antimony trisulfide given that preliminary testing of the concentrates resulted in acceptable grade and acceptably low contaminants to achieve military specification.
- Continuation of the supply of sized antimony metal to Ambri in accordance with our letter of intent of 2020 and continued communication regarding potential of further cooperation.
- Continuation of the processing of Soyatal ore to produce concentrates with the goal of testing antimony grade and contaminant content for the potential of an auxiliary source of antimony trisulfide while the Sierra Guadalupe property is started into production as the primary source. If the Soyatal concentrates pass testing, the decision to retain the Soyatal claims will be made.

In addition to the processing goals stated above, the Company intends to focus on and significantly increase its production, capacity, and sales of zeolite at its subsidiary Bear River Zeolite. The addition of two more winter-storage buildings (one located between the mine and the mill and the other located near the mine) is planned. Salt sheds for these ore storage locations are planned to eliminate the necessity of the use of tarps for keeping the zeolite dry during the winter and rainy seasons. The building near the mine also allows a location for the regular service maintenance of the mine equipment in winter and rainy months. The crushing rate is anticipated to increase 2-3 times with the addition of our new cone crusher and a host of improvements to the crushing equipment and parts downstream. This includes the updating of nearly all of our screens, along with likely the replacement of one of our hammermills with a crusher better suited for a more efficient production of our main product. These decisions will be aided by several sieve and aggregate flow studies. The Company plans to increase its efficiency and volume of crushed ore by means of the use of the new mining equipment purchased in 2022 along with improved blasting techniques and determination of the best balance between blasting and ripping. The enhancement of the dust collection and dust control also is planned and should enhance our ultra-fine production.

The following are highlights of the significant changes during 2022:

### Antimony

- The sale of antimony during 2022 was 1,394,036 pounds compared to 911,079 pounds in 2021, an increase of 53.0%.
- The average sales price of antimony during 2022 was $5.47/lb. compared with $5.29/lb. in 2021, an increase of $0.18/lb. (a 3.5% increase). During the beginning of 2023, the Rotterdam price of antimony is approximately $5.15/lb. per pound.
- We are producing and buying raw materials, which will allow us to ensure a steady flow of products for sale. Our smelter at Madero, Mexico, was processing primarily ores from the Wadley mines in 2022 under a clause that accompanies a purchase option agreement. Our smelter in Montana was producing material from both Mexico and our North American sources in 2022. Raw materials from our North American supplier were reduced in 2022 due to plant maintenance, an unexpected equipment failure, the effects of Covid, labor supply shortages, and shipping difficulties across the border due to political reasons.
- We produced and sold three truckloads of ingots of antimony metal, each containing 20 metric tons, in the first half of 2022 that were shipped directly to customers in the United States from our Madero smelter. This will significantly reduce our production and shipping costs compared to finishing the ingots in Montana.
- We are proceeding with further mapping and geological work to augment our initial geophysical, geochemical, and geological survey of the Los Juarez property to better understand its potential value.

Page 47 of 91

#### Table of Contents

### Zeolite

During 2022, the Company sold 13,047 tons of zeolite compared to 11,747 tons in 2021, an increase of 1,300 tons (11.1%). Bear River Zeolite (“BRZ”) realized a gross profit of $339,907 (10.8% of zeolite sales) in 2022 compared to a gross profit of $340,806 (13.1% of sales) in 2021. Net income for the BRZ segment was $141,496 for the year ended December 31, 2022 compared to $193,674 for the year ended December 31, 2021. The increase in production but decrease in profit were attributable to outpacing of costs to increase in pricing. As an example, the price of packaging materials, diesel, labor, electricity, oil, etc. all increased substantially in 2022. To address this, the Company plans to increase its price per ton of offered zeolite and concentrate its efforts more on bulk orders that minimize the focus of labor on packaging. Additionally, the Company plans to increase production volumes at Bear River Zeolite in 2023 to address growing customer demands.

### Corporate-wide

During the year ending December 31, 2022, the following transactions had a material impact on the Company’s financial performance:

- The signing of a purchase option agreement for the exclusive rights to all extracted mineral from the Wadley mines for an 8-month period allowing the Company to acquire antimony ore and ascertain grade and tonnages in advance of a decision to purchase affording the Company to accumulate more lots of antimony at its smelting facility in Madero than have ever been accumulated.
- The hiring of Richard Lyon as Plant Supervisor at Bear River Zeolite providing far better and more consistent oversight of personnel and operations with guidance from management in conjunction with the use of funds to substantially update and improve plant infrastructure.
- The sustained and favorable increased price of antimony.
- The purchase of a new and modern cone crusher and a host of new equipment at Bear River Zeolite to improve production and performance.
- The re-initiation of payments towards the acquisition of the Sierra Guadalupe property.
- The appointment of 3 new members to the Company’s Board of Directors, Tim Hasara, John C. Gustavsen, and Gary C. Evans.

Page 48 of 91

#### Table of Contents

### Results of Operations

### Operational and financial performance

### Antimony

Financial and operational metrics of antimony for the year ended December 31, 2022 and 2021 was as follows:

| Antimony - Combined USA and Mexico | Year ended December 31, 2022 | 2021 | $ Change | % Change |
| --- | ---: | ---: | ---: | ---: |
| Total revenue -antimony | $7,532,922 | $4,815,524 | $2,717,398 | 56.4% |
| Revenue - processing | 98,748 | - | 98,748 | N/A |
| Total revenue – antimony segment | $7,631,670 | $4,815,524 | 2,816,146 | 58.5% |
| Gross profit - antimony | $1,505,116 | $266,722 | 1,238,394 | 464.3% |
| Total lbs. of antimony metal sold | 1,394,036 | 911,079 | 482,957 | 53.0% |
| Average sales price/lb. metal | $5.47 | $5.29 | $0.18 | 3.5% |
| Average cost/lb. metal | $4.39 | $4.99 | $(0.60) | (11.9%) |
| Average gross profit/lb. metal | $1.08 | $0.30 | $0.78 | 259.9% |

During the year ended December 31, 2022, the average sales price for antimony increased $0.18 per pound compared to the year ended December 31, 2021. Gross profit per pound increased $0.78 per pound over the year ended December 31, 2021.

Due to its antimony production and sales along with a favorable antimony price, the Company enjoyed its first profitable year since 2018. We cut costs by selling finished ingots directly to customers in the United States from our Mexican smelter eliminating additional shipping and processing costs at our Montana facility.

The first two quarters of 2022 each recognized more net profit than any previous year in the Company’s history. The Company experienced a decrease in production in the third quarter due to a temporary decrease in feed for two reasons. First, there was a scheduled shut-down by our North American supplier that was followed by equipment failure at their facility. In addition to this, the supplier reported having difficulties with labor supply. Second, the decrease in supply corresponded with less sourcing in Mexico during the negotiation phase regarding our purchase option agreement for the Wadley property. The delay between the reception of ore at the Mexican Smelter combined with the aforementioned delay carried over into fourth quarter of the year.

The Company processed and sold 37,485 lbs. of antimony trisulfide as part of a tolling agreement. During this period, the Company worked on and solved several problems that it was having with its processing of antimony concentrate from Mexico into antimony trisulfide crystal for sale to the munitions market and the Defense Logistics Agency (“DLA”). In addition, two more furnaces were purchased to give the Company back-up in anticipation of planned maintenance.

Mitzi Hart, who assumed the role of Plant Manager and also assistant Sales Director for antimony, has extensive previous experience in sourcing trucking. This resulted in decreasing our trucking costs considerably. Also, the Company was able to offer a discount for clients willing to source their own trucking which resulted in several clients who now provide their own freight.

### Zeolite

Financial and operational performance of zeolite for the year ended December 31, 2022 and 2021 was as follows:

| Zeolite | Year ended December 31, 2022 | 2021 | $ Change | % Change |
| --- | ---: | ---: | ---: | ---: |
| Total revenue - zeolite | $3,151,330 | $2,593,641 | 557,689 | 21.5% |
| Gross profit - zeolite | 339,907 | 340,806 | (899) | (0.3%) |
| Tons of zeolite sold | 13,047 | 11,747 | 1,300 | 11.1% |
| Average sales price/ton | $241.55 | $220.78 | $20.77 | 9.4% |
| Average cost/ton | $216.27 | $191.77 | $24.50 | 12.8% |
| Average gross profit/ton | $25.28 | $29.01 | $(3.73) | (12.9%) |

Sales volume of zeolite for the year ended December 31, 2022 increased 1,300 tons over the year ended December 31, 2021. Average sales price per ton increased $20.77 for the year ended December 31, 2022 over the comparable period ending December 31, 2021.

Page 49 of 91

#### Table of Contents

At Bear River Zeolite, between 2021 and 2022, despite an increase in sold tons, gross profit decreased slightly. This was due to the increase in costs combined with a delay in raising our prices in order to retain particular clients that had pre-existing price agreements. The strategy going forward will be to increase our sales price while significantly increasing production and sales. The overall strategy for increasing production started with the mine and mining techniques and utilizing the newly purchased rolling stock (mining and trucking equipment). The Company experimented with ripping versus blasting and concluded at first that ripping was superior. However, due to the distribution of rock size from ripping, it was concluded by the end of 2022 that ripping caused more delay in processing owing to the necessity to drill and break or blast oversized rock that would not fit in the jaw crusher. Consequently, the primary technique that yields the fastest production from the mine through the mill is blasting. Improvements to the blasting technique are scheduled for 2023. The second phase of production improvements relate to the selection of the discharge size from the new cone crusher purchased in December. Once the optimal size has been determined that corresponds to the most efficient rate of production and efficiency in product size, the plan is to work our way downstream through the secondary crushing circuit and then the screening. Finally, the efficiency and production capacity of our packaging plant vs. available labor for this plant will be addressed to match the increased zeolite production.

### Precious Metals

Financial and operational performance of precious metals for the three months ended December 31, 2022 and 2021 was as follows:

| Precious metals | Year ended December 31, 2022 | 2021 | $ Change | % Change |
| --- | ---: | ---: | ---: | ---: |
| Total revenue - precious metals | $261,707 | $338,341 | (76,634) | (22.6%) |
| Gross profit precious metals | 151,167 | 231,077 | (79,910) | (34.6%) |
| Ounces sold - gold | 43.77 | 70 | (26.23) | (37.5%) |
| Ounces sold - silver | 25,122 | 27,342 | (2,220) | (8.1%) |

### EARNINGS BEFORE INTEREST TAX DEPRECIATION AND AMORTIZATION

The Company utilizes Earnings Before Interest Taxes Depreciation and Amortization (“EBITDA”), a non-GAAP financial measurement which approximates free cash flow.

Our company-wide Earnings Before Interest Taxes Depreciation Amortization (“EBITDA”) was $1,369,095 for the year ended December 31, 2022, compared to EBITDA of $825,950 for the year ended December 31, 2021, a 65.8% increase. Increase in gross revenue of $3,297,201 and increased gross profit of $1,157,585 were the primary drivers behind the EBITDA results in 2022.

Income from operations improved from a company-wide loss of $660,257 for the year ended December 31, 2021 to income from operations of $348,205 for the year ended December 31, 2022. Primary drivers were increased antimony sales and, to a lesser extent, continued strong market prices for antimony and zeolite.

Page 50 of 91

#### Table of Contents

EBIDTA schedules by business segment for the year ended December 31, 2022 and December 31, 2021 is presented as follows.

| Antimony – Combined USA and Mexico | Year ended December 31, 2022 | Year ended December 31, 2021 | $ Change | % Change |
| --- | ---: | ---: | ---: | ---: |
| Gross antimony revenue | $7,631,670 | $4,815,524 | $2,816,146 | 58.5% |
| Cost of sales | 6,126,554 | 4,548,802 | 1,577,752 | 34.7% |
| Gross profit – antimony | 1,505,116 | 266,722 | 1,238,394 | 464.3% |
| Operating expenses | 1,482,526 | 1,355,121 | 127,405 | 9.4% |
| **Income (loss) from operations** | 22,590 | (1,088,399) | 1,110,989 | 102.1% |
| Non-operating income | 129,481 | 603,179 | (473,698) | 78.5% |
| Provision for income tax | (16,073) | - | (16,073) | N/A |
| **Net income (loss) – antimony** | 135,998 | (485,220) | 621,218 | 128.0% |
| Interest expense | 6,884 | 1,700 | 5,184 | 304.9% |
| Provision for income tax | 16,073 | - | 16,073 | N/A |
| Depreciation and amortization | 630,855 | 613,202 | 17,653 | 2.9% |
| **EBITDA – antimony** | $789,810 | $129,682 | $660,128 | 509.0% |

| Zeolite | Year ended December 31, 2022 | Year ended December 31, 2021 | $ Change | % Change |
| --- | ---: | ---: | ---: | ---: |
| Gross zeolite revenue | $3,151,330 | $2,593,641 | $557,689 | 21.5% |
| Cost of sales | 2,811,423 | 2,252,835 | 558,588 | 24.8% |
| Gross profit – zeolite | 339,907 | 340,806 | (899) | (0.3%) |
| Operating expenses | 165,459 | 143,741 | 21,718 | 15.1% |
| **Income from operations** | 174,448 | 197,065 | (22,617) | (11.5%) |
| Non-operating income (expense) | (32,952) | (3,391) | (29,561) | 871.7% |
| **Net income – zeolite** | 141,496 | 193,674 | (52,178) | (26.9%) |
| Interest expense | 8,257 | 3,839 | 4,418 | 115.1% |
| Depreciation and amortization | 167,825 | 160,414 | 7,411 | 4.6% |
| **EBITDA – zeolite** | $317,578 | $357,927 | $(40,349) | (11.3%) |

Page 51 of 91

#### Table of Contents

| Precious Metals | Year ended December 31, 2022 | 2021 | $ Change | % Change |
| --- | ---: | ---: | ---: | ---: |
| Gross revenue precious metals | $261,707 | $338,341 | $(76,634) | (22.6%) |
| Cost of sales | 110,540 | 107,264 | 3,276 | 3.1% |
| Gross profit – precious metals | 151,167 | 231,077 | (79,910) | (34.6%) |
| Operating expenses | - | - | - | N/A |
| **Income from operations** | 151,167 | 231,077 | (79,910) | (34.6%) |
| Non-operating expenses | - | - | - | N/A |
| **Net income – precious metals** | 151,167 | 231,077 | (79,910) | (34.6%) |
| Interest expense | - | - | - | N/A |
| Depreciation and amortization | 110,540 | 107,264 | 3,276 | 3.1% |
| **EBITDA – precious metals** | $261,707 | $338,341 | $(76,634) | (22.6%) |

| Company-wide | Year ended December 31, 2022 | Year ended December 31, 2021 | $ Change | % Change |
| --- | ---: | ---: | ---: | ---: |
| Gross revenue | $11,044,707 | $7,747,506 | $3,297,201 | 42.6% |
| Cost of sales | 9,048,517 | 6,908,901 | 2,139,616 | 31.0% |
| Gross profit | 1,996,190 | 838,605 | 1,157,585 | 138.0% |
| Operating expenses | 1,647,985 | 1,498,862 | 149,123 | 9.9% |
| **Income (loss) from operations** | 348,205 | (660,257) | 1,008,462 | 152.7% |
| Non-operating income | 96,529 | 599,788 | (503,259) | (83.9%) |
| Provision for income tax | (16,073) | - | (16,073) | N/A |
| **Net income (loss)** | 428,661 | (60,469) | 489,130 | 808.9% |
| Interest expense | 15,141 | 5,539 | 9,602 | 173.4% |
| Provision for income tax | 16,073 | - | 16,073 | N/A |
| Depreciation and amortization | 909,220 | 880,880 | 28,340 | 3.2% |
| **EBITDA – Company-wide** | $1,369,095 | $825,950 | $543,145 | 65.8% |

Page 52 of 91

#### Table of Contents

### LIQUIDITY AND FINANCIAL CONDITION

| WORKING CAPITAL | December 31, 2022 | December 31, 2021 |
| --- | ---: | ---: |
| Current assets | $21,617,359 | $23,568,992 |
| Current liabilities | (2,219,870) | (2,070,854) |
| Working capital | $19,397,489 | $21,498,138 |

| CASH FLOWS | For the year ended December 31, 2022 | December 31, 2021 |
| --- | ---: | ---: |
| Cash flow used by operating activities | $(249,277) | $(2,431,477) |
| Cash flow used by investing activities | (1,785,661) | (653,126) |
| Cash flow provided (used) by financing activities | (267,725) | 23,782,555 |
| Net change in cash during period | $(2,302,663) | $20,697,952 |

As of December 31, 2022, the Company had cash and cash equivalents of hand of $19,117,666 which consisted of $19,060,378 in money market funds and deposit accounts along with $57,288 of restricted cash.

Net cash used by operating activities was $249,277 for the year ending December 31, 2022, compared with cash used by operating activities of $2,431,477 during the year ended December 31, 2021. The $2,182,200 change in cash from operating activities is attributable to ongoing strong gross profit from antinomy sales.

Net cash used by investing activities of $1,785,661 included the purchase of a caterpillar for the Bear River Zeolite operation and ongoing construction of a new warehouse in Preston, ID.

Cash flow used by financing activities for the year ended December 31, 2022 was $267,725 compared to a cash flow provided by financing activities of $23,782,555 for the year ended December 31, 2021. In 2021, the Company raised $23,342,178 from the issuance of common stock and warrants and $1,790,705 from the exercise of warrants by existing shareholders. This capital raise and warrant exercise was not recurring during the year ended December 31, 2022.

For the year ending December 31, 2023, we are planning to use funds for

- Continue with substantial upgrades to the Bear River Zeolite plant, including modernizing equipment in our crushing plant to include new screens, sorting, conveying, dust-control, and crushing equipment with increased number of safety mechanisms to avoid shut-downs and insure uninterrupted production. Additionally, we plan to use funds to expand and update our packaging capacity both on-site and possibly the creation of an off-site packaging plant where we can source more labor. All use of funds for Bear River Zeolite are for the express purpose of substantially increasing production and sales of zeolite. Some of the use of funds at Bear River Zeolite will doubtlessly be applied to increasing labor costs and an increase in the number of workers.
- The continuation of payment towards the completion of the purchase of the Sierra Guadalupe mining claims and surface rights. Also, the payment towards the purchase of ore and assistance for establishing the extraction of mineral at this property for the purpose of both the synthesis of antimony trisulfide, antimony metal, and antimony trioxide.
- The payment of the remainder of the amount due for the purchase of the Soyatal mining claims and purchase of ores from those claims for the synthesis of antimony trisulfide and antimony metal.
- For the addition of a gravity separation circuit at the Madero Smelter for the upgrading of low-grade oxide ores. The updating of equipment that has either rusted, or otherwise failed due to normal wear and tear including, but not limited to, the regular re-lining of furnaces. At some point in the future, we intend to use funds to update the facility in such a way that it will be able to produce finished antimony oxide for sale directly to customers. This will require a very large building to enclose our furnaces to shield them from rain, wind, and the weather. Also, we will need to purchase some quality-control equipment for this purpose.
- In Montana, to install two more electric furnaces; to reline two more smelting furnaces, and to continue to source and pay for labor at a competitive rate and pay our limited crew what they are worth.
- At Puerto Blanco, to continue to process ore into concentrate for synthesis into antimony trisulfide product. For the regular purchase of consumables and reagents necessary to operate the flotation facility and lab.
- To hire a certified geologist to do additional mapping and geologic work at the Los Juarez property to complete the geophysical, geochemical, and previous geological work that was done in order to help ascertain the value of the property.
- To pay for taxes on all mining concessions.
- To pay for all regular permitting fees associated with our holdings in Mexico and the United States.
- To pay for new sources of potential antimony ore and continue to investigate new or alternative sources of antimony ore.

Page 53 of 91

#### Table of Contents

### Off-Balance Sheet Arrangements

The Company has no significant off-balance sheet arrangements that have or are reasonably likely to have a current or future effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that are material to its stockholders.

### Critical Accounting Estimates

We have, besides our estimates of the amount of depreciation on our assets, two critical accounting estimates. The percentage of antimony contained in our unprocessed ore in inventory is based on assays taken at the time the ore is delivered, and may vary when the ore is processed. Also, the asset recovery obligation on our balance sheet is based on an estimate of the future cost to recover and remediate our properties as required by our permits upon cessation of our operations, and may differ when we cease operations.

- The value of unprocessed ore is based on assays taken at the time the ore is delivered, and may vary when the ore is processed. We assay the ore to estimate the amount of antimony contained per metric ton, and then make a payment based on the Rotterdam price of antimony and the % of antimony contained. Our payment scale incorporates a penalty for ore with a low percentage of antimony. It is reasonably likely that the initial assay will differ from the amount of metal recovered from a given lot. If the initial assay of a lot of ore on hand at the end of a reporting period were different, it would cause a change in our reported inventory, but would not change our accounts payable, reported cost of goods sold or net income amounts. Our net income would not be affected. Direct shipping ore (DSO) purchased at our Madero smelter is paid for at a fixed amount at the time of delivery and assaying, and is not subject to accounting estimates. The amount of the accounting estimate for purchased ore at our Puerto Blanco mill is in a constant state of change because the amount of purchased ore and the percent of metal contained are constantly changing. Due to the amount of ore on hand at the end of a reporting period, as compared to the amount of total assets, liabilities, equity, and the ore processed during a reporting period, any change in the amount of estimated metal contained would likely not result in a material change to our financial condition.
- The asset retirement obligation and asset on our balance sheet is based on an estimate of the future cost to recover and remediate our properties as required by our permits upon cessation of our operations, and may differ when we cease operations. We make periodic reviews of the remaining life of the mine and other operations, and the estimated remediation costs upon closure, and adjust our account balances accordingly. At this time, we think that an adjustment in our asset recovery obligation is not required, and an adjustment in future periods would not have a material impact in the year of adjustment, but would change the amount of the annual accretion and amortization costs charged to our expenses by an undetermined amount.

## Controls and procedures

As filed, 7,865 characters.

### Evaluation of disclosure controls and procedures

As of the end of the period covered by this Annual Report on Form 10-K, an evaluation was carried out under the supervision of and with the participation of our management, including the principal executive officer and the principal financial officer of the effectiveness of the design and operations of our disclosure controls and procedures (as defined in Rule 13a – 15(e) and Rule 15d – 15(e) under the Exchange Act) as of the end of the period covered by this report. Based on that evaluation, the principal executive officer and the principal financial officer have concluded that our disclosure controls and procedures were not effective in ensuring that: (i) information required to be disclosed by the Company in reports that it files or submits to the SEC under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in applicable rules and forms, and (ii) material information required to be disclosed in our reports filed under the Exchange Act is accumulated and communicated to our management, including our principal executive officer and principal financial officer, as appropriate, to allow for accurate and timely decisions regarding required disclosure.

Disclosure controls and procedures were not effective due primarily to a material weakness in the segregation of duties in the Company’s internal control of financial reporting as discussed below.

### Internal control over financial reporting

#### Management’s annual report on internal control over financial reporting

Our management is responsible for establishing and maintaining adequate internal control over financial reporting to provide reasonable assurance regarding the reliability of our financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. Internal control over financial reporting includes those policies and procedures that (i) pertain to the maintenance of records that in reasonable detail accurately and fairly reflect the transactions and dispositions of the assets of our company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the Company are being made only in accordance with authorizations of our management and directors; and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the Company’s assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Management assessed our internal control over financial reporting as of December 31, 2022, the end of our fiscal year. Management based its assessment on criteria established in *Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013)*. Management’s assessment included evaluation of such elements as the design and operating effectiveness of key financial reporting controls, process documentation, accounting policies, and our overall control environment.

Based on our assessment, management has concluded that our internal control over financial reporting was not effective, as of the end of the fiscal year, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external reporting purposes in accordance with generally accepted accounting principles, because management identified a material weakness in the Company’s internal control over financial reporting related to the segregation of duties. This is due primarily to the limited staff and small size of the Company, although internal controls have improved over the prior year with the addition of an additional staff member in our accounting department and a consultant for financial statement preparation, resulting in increased segregation of duties.

While the Company does adhere to internal controls and processes that were designed and implemented by an experienced Chief Financial Officer, it is difficult with a very limited staff to maintain appropriate segregation of duties in the initiating and recording of transactions, thereby creating a segregation of duties weakness. Due to: (i) the significance of segregation of duties to the preparation of reliable financial statements; (ii) the significance of potential misstatement that could have resulted due to the deficient controls; and (iii) the absence of sufficient other mitigating controls, we determined that this control deficiency resulted in more than a remote likelihood that a material misstatement or lack of disclosure within the annual or interim financial statements may not be prevented or detected.

Page 79 of 91

#### Table of Contents

### Management’s Remediation Initiatives

Management has evaluated, and continues to evaluate, avenues for mitigating our internal controls weaknesses, but mitigating controls to completely mitigate internal control weaknesses have been deemed to be impractical and prohibitively costly, due to the size of our organization at the current time. Management expects to continue to use reasonable care in following and seeking improvements to effective internal control processes that have been and continue to be in use at the Company. Because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that misstatements due to error or fraud will not occur or that all control issues within the Company have been detected. These inherent limitations include the realities that judgments in decision-making can be faulty and that breakdowns can occur because of simple errors or mistakes. The design of any system of controls is based in part on certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions. Projections of any evaluation of controls effectiveness to future periods are subject to risks.

Management’s remediation initiatives include having retained the Company’s Chief Financial Officer. He is well-versed in internal control environments, having implemented, documented and tested multiple control environments over 30 years and has served as a CFO in publicly-traded companies for 13 years. The Company has also added Board members Gary C. Evans and Tim Hasara to its audit committee, both of whom have extensive background in publicly traded companies and governance.

The Company intends to implement several initiatives related to internal controls including upgrading technology and software applications designed to enhance segregation of duties, workflow authorization and payment processing. Further, the Company is evaluating cloud-based financial reporting applications which allow for increased collaboration, transparency and review of financial reporting and preparation of statutory reporting.

### Changes in Internal Control Over Financial Reporting

There were no changes in our internal control over financial reporting (as defined in Rule 15d-15(f) under the Exchange Act) that occurred during our most recent quarter ended December 31, 2022, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

Filed Jul 18, 2023.
Source: SEC EDGAR, the filing index for accession 0001654954-23-009305. Last ingested by Listed: Nov 24, 2026, 18:33 ET. No prices; not investment advice.