# Ur-Energy Inc: Form 10-Q for the period ended Sep 30, 2024

- Company: [Ur-Energy Inc](/companies/urg.md) (CIK 1375205)
- Form: 10-Q
- Filed: 2024-11-06
- Accepted by EDGAR: Nov 6, 2024, 17:06 ET
- Period: 2024-09-30
- Accession: 0001654954-24-013836
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1375205/000165495424013836/urg_10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1375205/000165495424013836/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2024-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2024-07-01 to 2024-09-30 | $6.4m | us-gaap:Revenues |
| Revenue | 9 months, 2024-01-01 to 2024-09-30 | $11.1m | us-gaap:Revenues |
| Cost of revenue | 3 months, 2024-07-01 to 2024-09-30 | $5.6m | us-gaap:CostOfRevenue |
| Cost of revenue | 9 months, 2024-01-01 to 2024-09-30 | $10.1m | us-gaap:CostOfRevenue |
| Gross profit | 3 months, 2024-07-01 to 2024-09-30 | $787.0k | us-gaap:GrossProfit |
| Gross profit | 9 months, 2024-01-01 to 2024-09-30 | $974.0k | us-gaap:GrossProfit |
| Operating income | 3 months, 2024-07-01 to 2024-09-30 | −$11.9m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2024-01-01 to 2024-09-30 | −$39.6m | us-gaap:OperatingIncomeLoss |
| Net income | 3 months, 2024-07-01 to 2024-09-30 | −$8.0m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2024-01-01 to 2024-09-30 | −$33.1m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2024-07-01 to 2024-09-30 | −$0.02 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2024-01-01 to 2024-09-30 | −$0.11 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2024-07-01 to 2024-09-30 | −$0.02 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2024-01-01 to 2024-09-30 | −$0.11 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2024-07-01 to 2024-09-30 | 341,418,122 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2024-01-01 to 2024-09-30 | 302,077,595 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2024-01-01 to 2024-09-30 | −$32.5m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 9 months, 2024-01-01 to 2024-09-30 | $5.7m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2024-09-30 | $118.5m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2024-09-30 | $125.0m | us-gaap:AssetsCurrent |
| Total assets | at 2024-09-30 | $201.4m | us-gaap:Assets |
| Current liabilities | at 2024-09-30 | $7.5m | us-gaap:LiabilitiesCurrent |
| Current portion of debt | at 2024-09-30 | $0 | us-gaap:DebtCurrent |
| Shareholders' equity | at 2024-09-30 | $152.9m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 54,627 characters.

### Business Overview

The following discussion and analysis by management is designed to provide information that we believe is necessary for an understanding of our financial condition, changes in financial condition, and results of our operations and should be read in conjunction with the audited financial statements and MD&A contained in our Annual Report on Form 10-K for the year ended December 31, 2023.

Incorporated on March 22, 2004, Ur-Energy is an exploration stage issuer, as that term is defined by the SEC. We are engaged in uranium recovery and processing activities, including the acquisition, exploration, development, and operation of uranium mineral properties in the U.S. We are operating our first in situ recovery uranium facility at our Lost Creek Project in Wyoming. Ur-Energy is a corporation continued under the *Canada Business Corporations Act* on August 8, 2006. Our common shares are listed on the TSX under the symbol “URE” and on the NYSE American under the symbol “URG.”

Ur-Energy has one wholly owned subsidiary, Ur-Energy USA Inc., incorporated under the laws of the State of Colorado. Ur-Energy USA Inc. has three wholly-owned subsidiaries: NFU Wyoming, LLC, a limited liability company formed under the laws of the State of Wyoming which acts as our land holding and exploration entity; Lost Creek ISR, LLC, a limited liability company formed under the laws of the State of Wyoming to operate our Lost Creek Project and hold our Lost Creek properties and assets; and Pathfinder Mines Corporation, incorporated under the laws of the State of Delaware, which holds, among other assets, the Shirley Basin Project in Wyoming. Our material U.S. subsidiaries remain unchanged since the filing of our Annual Report on Form 10-K, dated March 6, 2024.

We utilize in situ recovery (“ISR”) of the uranium at our flagship project, Lost Creek, and will do so at other projects where possible. The ISR technique is employed in uranium extraction because it allows for an effective recovery of roll front uranium mineralization at a lower cost. At Lost Creek, we extract and process uranium oxide (“U3O8”) for shipping to a third-party conversion facility to be weighed, assayed and stored until sold. After sale, when further processed, the uranium we have produced fuels carbon-free, emissions-free nuclear power which is a cost-effective, safe, and reliable form of electrical power. Nuclear power provides an estimated 50% of the carbon-free electricity in the U.S.

Our Lost Creek Project is permitted and licensed for annual recovery of up to 1.2 million pounds U3O8. The processing facility at Lost Creek, which includes all circuits for the production, drying and packaging of U3O8 for delivery into sales transactions, is designed and approved under current licensing to process up to 2.2 million pounds of U3O8 annually, which provides additional capacity of up to one million pounds U3O8 to process material from other sources. The Lost Creek processing facility will be utilized to process captured U3O8 from our Shirley Basin Project for which a satellite plant will be built in 2025. However, the Shirley Basin permit and license allow for the construction of a full processing facility, providing greater construction and operating flexibility as may be dictated by future market conditions.

Our sales deliveries in 2024 are projected to be 570,000 pounds U3O8 into two of our sales agreements secured in 2022. We now have six multi-year sales agreements which together anticipate sales of approximately 5.7 million pounds U3O8 between 2024 and 2030.

22

#### Table of Contents

### Industry and Market Update

In the past several years, the nuclear markets have been favorably affected in many ways through greater acceptance of nuclear energy. Recently, technology and other industries operating data centers (in what is now simply being referred to as “big data”) have realized the opportunities which exist to maintain carbon free baseload electricity while supporting the immense electric demand generated by these centers. The Electric Power Research Institute’s May 28, 2024, White Paper titled Powering Intelligence, suggests that data centers are expected to consume as much as 9.1% of U.S. electricity generation by 2030 versus an estimated 4% today.

The International Energy Agency stated in its Electricity 2024, Analysis and Forecast to 2026 report that

*Data centres are significant drivers of growth in electricity demand in many regions. After globally consuming an estimated 460 terawatt-hours (TWh) in 2022, data centres’ total electricity consumption could reach more than 1 000 TWh in 2026. This demand is roughly equivalent to the electricity consumption of Japan.*

The use of nuclear power by big data isn’t just a projection; it is already happening in a material way. Talen has already been selling significant power to big data. During the quarter, Constellation Energy announced a power purchase agreement with Microsoft for 835 megawatts of electricity. This is the largest ever power purchase agreement for Constellation and will result in the restart of the Three Mile Island Unit 1 nuclear reactor in Pennsylvania. While contributing 835 megawatts of carbon-free electricity to the grid, this historic project will create 3,400 jobs and offset approximately 61 million metric tons of CO2 emissions over 20 years. Still others in big data, including Google and Amazon, have announced plans to utilize nuclear energy to satisfy these rapidly growing electrical needs.

Throughout 2024, utilities and other buyers continue to identify energy security as a nearly universal priority. Ongoing war and geopolitics have only strengthened the resolve of fuel purchasers to reduce dependence on Russian nuclear products. U.S. and global utilities have increasingly been seeking non-Russian supplies when negotiating uranium term sales agreements.

In the U.S., the ban on Russian imports of nuclear fuels, signed into law earlier in the year, became effective in August 2024. While allowing certain waivers until January 1, 2028, the prohibitions on imports continue through 2040. The ban will help to secure the U.S. nuclear fuel supply chain and advance domestic uranium recovery operations.

The U.S. Department of Energy (DOE) has been progressing its requests for proposals under both its high-assay, low-enriched uranium (HALEU) and low-enriched uranium (LEU) programs for which domestic uranium supply is preferred. In October 2024, the DOE announced it awarded contracts to Centrus Energy Corp., Orano SA, General Matter Inc. and Louisiana Energy Services (a URENCO company) to provide enrichment services to develop HALEU to fuel small modular nuclear reactors. The contracts for enrichment are worth up to $2.7 billion over the next ten years. These programs also reflect efforts by the U.S. to advance energy security; Russia has been the only potential source of HALEU.

### Mineral Rights and Properties

We have 12 U.S. uranium properties. Ten of our uranium properties are in the Great Divide Basin, Wyoming, including Lost Creek. Currently, we control nearly 1,800 unpatented mining claims and three State of Wyoming mineral leases for a total of more than 35,000 acres in the area of the Lost Creek Property, including the Lost Creek permit area (the “Lost Creek Project”), and certain adjoining properties referred to as LC East, LC West, LC North, LC South and EN Project areas (collectively, with the Lost Creek Project, the “Lost Creek Property”). Our Shirley Basin Project permit area, also in Wyoming, comprises nearly 1,800 acres of Company-controlled mineral acres.

### Lost Creek Property

During 2024 Q3 we captured 75,075 pounds, dried and packaged 71,804 pounds and shipped 67,488 pounds U3O8. Although not at previously anticipated rates, these figures represent increases in production numbers compared with the captured and dried figures of earlier quarters.

At quarter end, our in-process inventory was approximately 90,140 pounds, our drummed inventory at Lost Creek was 26,580 pounds, and our finished inventory at the conversion facility was 40,713 pounds U3O8. In addition to the two shipments made to the conversion facility during 2024 Q3, we made two shipments following the end of the quarter, which totaled 46,592 pounds U3O8.

As we continue to work through the challenges of ramp-up at Lost Creek, we now anticipate 2024 production will be in a range between 240,000 and 280,000 pounds U3O8 captured on IX resin.

We expect to satisfy our remaining 2024 contractual commitments to our customers with Lost Creek production and other available sources.

During the quarter, we brought Header Houses (HHs) 2-9 and 2-10 online, bringing the number of new header houses in the first three quarters of 2024 to five. HH 2-11 came online in early October. HH 2-12 is on the ground at Lost Creek, and HHs 2-13 through 2-15 are being constructed in our Casper facilities.

Throughout 2024 Q3 we increased our drill rig count at Lost Creek to 15. Two of the rigs which had been deployed to Shirley Basin returned to Lost Creek in October, such that our current rig count at Lost Creek is 17. We anticipate at least three additional drill rigs will mobilize to Lost Creek prior to the end of the year.

Our most recently completed deep disposal well, LCDW5, has been placed into operation, and with Lost Creek’s other two deep wells, is satisfying wastewater needs.

Because our incoming employees have little or no experience with uranium ISR operations, training remains a priority. As we are gaining a larger core group of staff, we continue to focus on retention as well as recruitment in efforts to stabilize our workforce.

23

#### Table of Contents

### Shirley Basin

Following our announcement in early 2024 of the “go” decision to begin buildout of our Shirley Basin in situ recovery facility in Carbon County, Wyoming we initiated several work programs for the year. These programs have complemented our initial purchasing plan for long lead-time equipment which began in 2023.

Installation of the monitor wells for the first mine unit at Shirley Basin is complete. The two drill rigs which were primarily responsible for the monitor well program have been redeployed to Lost Creek in October. We have begun to collect hydrologic data and have initiated aquifer pump testing for the first mine unit. This test program is anticipated to be completed in 2024 Q4. The hydrologic confinement at Shirley Basin is well established.

The existing south access road to the site has been upgraded to an all-season road. Power supply to the satellite plant construction area has been completed and the line is energized. We are advancing the refurbishment of the pre-existing substation that serviced historic Shirley Basin operations. The septic system is installed.

We have selected a contractor who has commenced renovation of existing site buildings which will be used for construction, maintenance and drill casing facilities. The office building layout has been approved and we are nearing completion of a construction agreement.

Engineering related to the satellite plant, including the wastewater treatment system, is at various stages of design and layout. Steel has been rolled and welded for 15 IX columns at a fabrication facility in Casper. Construction of these columns is progressing toward expected delivery in 2025 Q3. Long-lead items remain on schedule, and we are vigilant in our review of timing for additional long- and mid-lead time purchases.

We continue to expect construction at Shirley Basin to be complete in late 2025 with a pre-operation inspection by the State of Wyoming following soon after.

### Sales of U3O8 and Sales Agreements

We sold 100,000 pounds U3O8 in 2024 Q3 at an average price of $61.65 per pound for proceeds of $6.2 million.

We continue to anticipate that we will deliver and sell 570,000 pounds U3O8 in 2024. Including the revenue received during the quarter, we expect to realize revenues of $33.1 million from our 2024 U3O8 sales.

Deliveries for 2025 are committed to three of our customers for a base amount of 700,000 pounds U3O8. Under these agreements, two of the three buyers may elect to flex up or down by as much as 10% of the annual base delivery quantity. Both purchasers have elected to flex up their 2025 purchases by 10%, such that we now anticipate we will deliver 740,000 pounds U3O8 into our term sales agreements in 2025.

### Equity Financing

On July 29, 2024, the Company closed an underwritten public offering of 57,150,000 common shares at a price of $1.05 per common share. The Company also granted the underwriters a 30-day option to purchase up to 8,572,500 additional common shares on the same terms. The option was exercised in full. Including the exercised option, Ur-Energy issued a total of 65,722,500 common shares. The gross proceeds to Ur-Energy from this offering were approximately $69.0 million. After fees and expenses of $3.8 million, net proceeds to the Company were approximately $65.2 million.

24

#### Table of Contents

### Results of Operations

### Reconciliation of Non-GAAP measures with US GAAP financial statement presentation

The following tables include measures specific to U3O8 sales, product cost, product profit, pounds sold, price per pound sold, cost per pound sold, and product profit per pound sold. These measures do not have standardized meanings within US GAAP or a defined basis of calculation. These measures are used by management to assess business performance and determine production and pricing strategies. They may also be used by certain investors to evaluate performance. The following two tables provide a reconciliation of U3O8 price per pound sold and U3O8 cost per pound sold to the consolidated financial statements.

#### U3O8 Price per Pound Sold Calculation

|  | Unit | 2023 Q4 | 2024 Q1 | 2024 Q2 | 2024 Q3 | 2024 YTD |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Sales per financial statements | $000 | 5,441 | - | 4,653 | 6,400 | 11,053 |
| Disposal fees | $000 | - | - | (29) | (235) | (264) |
| U3O8 sales | $000 | 5,441 | - | 4,624 | 6,165 | 10,789 |
| U3O8 pounds sold | lb | 90,000 | - | 75,000 | 100,000 | 175,000 |
| U3O8 price per pound sold | $/lb | 60.44 | - | 61.65 | 61.65 | 61.65 |

Sales per the financial statements includes U3O8 sales and disposal fees. Disposal fees received at Pathfinder’s Shirley Basin property do not relate to the sale of U3O8 and are excluded from the U3O8 sales and U3O8 price per pound sold measures.

#### U3O8 Cost per Pound Sold Reconciliation

|  | Unit | 2023 Q4 | 2024 Q1 | 2024 Q2 | 2024 Q3 | 2024 YTD |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Cost of sales per financial statements | $000 | 5,055 | 1,139 | 3,327 | 5,613 | 10,079 |
| Lower of cost or NRV adjustment | $000 | (2,531) | (1,139) | (200) | (722) | (2,061) |
| U3O8 product cost | $000 | 2,524 | - | 3,127 | 4,891 | 8,018 |
| U3O8 pounds sold | lb | 90,000 | - | 75,000 | 100,000 | 175,000 |
| U3O8 cost per pound sold | $/lb | 28.04 | - | 41.69 | 48.91 | 45.82 |

Cost of sales per the financial statements includes U3O8 costs of sales and lower of cost or NRV adjustments. U3O8 cost of sales includes ad valorem and severance taxes related to the extraction of uranium, all costs of wellfield and plant operations including the related depreciation and amortization of capitalized assets, reclamation, and mineral property costs, plus product distribution costs. These costs are also used to value inventory. The resulting inventoried cost per pound is compared to the NRV of the product, which is based on the estimated sales price of the product, net of any necessary costs to finish the product. Any inventory value in excess of the NRV is charged to cost of sales in the financial statements. NRV adjustments, if any, relate to U3O8 inventories and do not relate to the sale of U3O8, and are excluded from the U3O8 cost of sales and U3O8 cost per pound sold measures.

25

#### Table of Contents

### U3O8 Sales

The following table provides information on our U3O8 sales.

| U3O8 Sales by Product Type U3O8 Sales | Unit | 2023 Q4 | 2024 Q1 | 2024 Q2 | 2024 Q3 | 2024 YTD |
| --- | --- | ---: | ---: | ---: | ---: | ---: |
| Produced | $000 | 5,441 | - | 4,624 | 6,165 | 10,789 |
| Purchased | $000 | - | - | - | - | - |
|  | **$000** | **5,441** | **-** | **4,624** | **6,165** | **10,789** |
| **U3O8 Pounds Sold** |  |  |  |  |  |  |
| Produced | lb | 90,000 | - | 75,000 | 100,000 | 175,000 |
| Purchased | lb | - | - | - | - | - |
|  | **lb** | **90,000** | **-** | **75,000** | **100,000** | **175,000** |
| **U3O8 Price per Pounds Sold** |  |  |  |  |  |  |
| Produced | $/lb | 60.44 | - | 61.65 | 61.65 | 61.65 |
| Purchased | $/lb | - | - | - | - | - |
|  | **$/lb** | **60.44** | **-** | **61.65** | **61.65** | **61.65** |

As previously announced, the Company made the decision to ramp up operations after securing new term contracts in 2022 with initial deliveries beginning in 2023 Q3.

We sold 175,000 pounds of U3O8 in the nine months ended September 30, 2024 at an average price per pound sold of $61.65. In the nine months ended September 30, 2023, we sold 190,000 pounds at an average price per pound sold of $62.56.

Our total sales in 2024 are projected at 570,000 pounds of U3O8 at an average price per pound sold of $58.15 and we expect to realize revenues of $33.1 million. The deliveries are under contracts negotiated in 2022, when the long-term price was between $43 and $52 per pound.

Deliveries for 2025 are committed to three customers for a base amount of 700,000 pounds of U3O8. Under our agreements, two of the three buyers may elect to flex up or down by as much as 10% of the annual base delivery quantity. We received notice from both purchasers of their election to flex up their 2025 purchases by 10%, such that we now anticipate we will deliver 740,000 pounds of U3O8 into our term sales agreements in 2025.

26

#### Table of Contents

### U3O8 Product Cost

The following table provides information on our U3O8 product cost.

| U3O8 Product Cost by Product Type U3O8 Product Cost | Unit | 2023 Q4 | 2024 Q1 | 2024 Q2 | 2024 Q3 | 2024 YTD |
| --- | --- | ---: | ---: | ---: | ---: | ---: |
| Ad valorem and severance taxes | $000 | 53 | - | 42 | 81 | 123 |
| Cash costs | $000 | 1,674 | - | 2,336 | 3,798 | 6,134 |
| Non-cash costs | $000 | 797 | - | 749 | 1,012 | 1,761 |
| Produced | $000 | 2,524 | - | 3,127 | 4,891 | 8,018 |
| Purchased | $000 | - | - | - | - | - |
|  | **$000** | **2,524** | **-** | **3,127** | **4,891** | **8,018** |
| **U3O8 Pounds Sold** |  |  |  |  |  |  |
| Produced | lb | 90,000 | - | 75,000 | 100,000 | 175,000 |
| Purchased | lb | - | - | - | - | - |
|  | **lb** | **90,000** | **-** | **75,000** | **100,000** | **175,000** |
| **U3O8 Cost per Pound Sold** |  |  |  |  |  |  |
| Ad valorem and severance taxes | $/lb | 0.59 | - | 0.56 | 0.81 | 0.70 |
| Cash costs | $/lb | 18.60 | - | 31.15 | 37.98 | 35.05 |
| Non-cash costs | $/lb | 8.85 | - | 9.98 | 10.12 | 10.07 |
| Produced | $/lb | 28.04 | - | 41.69 | 48.91 | 45.82 |
| Purchased | $/lb | - | - | - | - | - |
|  | **$/lb** | **28.04** | **-** | **41.69** | **48.91** | **45.82** |

We sold 175,000 pounds of U3O8 in the nine months ended September 30, 2024 at an average price per pound sold of $61.65. The average cost per pound sold was $45.82 for the nine months ended September 30, 2024. In the nine months ended September 30, 2023, we sold 190,000 pounds at an average price per pound sold of $62.56. The average cost per pound sold was $32.38 for the nine months ended September 30, 2023.

In 2023, the sales were made with a combination of pre-ramp up produced and purchased pounds the Company already had in its finished inventory at the conversion facility. The produced pounds were inventoried in earlier years with higher production rates and lower average costs per pound produced. As the post-ramp up production rates increase, we expect to again achieve lower average costs per pound produced.

27

#### Table of Contents

### U3O8 Product Profit

The following table provides information on our U3O8 product profit.

| Unit U3O8 Product Profit by Product Type U3O8 Sales | 2023 Q4 | 2024 Q1 | 2024 Q2 | 2024 Q3 | 2024 YTD |
| --- | ---: | ---: | ---: | ---: | ---: |
| Produced $000 | 5,441 | - | 4,624 | 6,165 | 10,789 |
| Purchased $000 | - | - | - | - | - |
| **$000** | **5,441** | **-** | **4,624** | **6,165** | **10,789** |
| **U3O8 Cost of Sales** |  |  |  |  |  |
| Produced $000 | 2,524 | - | 3,127 | 4,891 | 8,018 |
| Purchased $000 | - | - | - | - | - |
| **$000** | **2,524** | **-** | **3,127** | **4,891** | **8,018** |
| **U3O8 Product Profit** |  |  |  |  |  |
| Produced $000 | 2,917 | - | 1,497 | 1,274 | 2,771 |
| Purchased $000 | - | - | - | - | - |
| **$000** | **2,917** | **-** | **1,497** | **1,274** | **2,771** |
| **U3O8 Pounds Sold** |  |  |  |  |  |
| Produced lb | 90,000 | - | 75,000 | 100,000 | 175,000 |
| Purchased lb | - | - | - | - | - |
| **lb** | **90,000** | **-** | **75,000** | **100,000** | **175,000** |
| **U3O8 Price per Pound Sold** |  |  |  |  |  |
| Produced $/lb | 60.44 | - | 61.65 | 61.65 | 61.65 |
| Purchased $/lb | - | - | - | - | - |
| **$/lb** | **60.44** | **-** | **61.65** | **61.65** | **61.65** |
| **U3O8 Cost per Pound Sold** |  |  |  |  |  |
| Produced $/lb | 28.04 | - | 41.69 | 48.91 | 45.82 |
| Purchased $/lb | - | - | - | - | - |
| **$/lb** | **28.04** | **-** | **41.69** | **48.91** | **45.82** |
| **U3O8 Product Profit per Pound Sold** |  |  |  |  |  |
| Produced $/lb | 32.40 | - | 19.96 | 12.74 | 15.83 |
| Purchased $/lb | - | - | - | - | - |
| **$/lb** | **32.40** | **-** | **19.96** | **12.74** | **15.83** |
| **U3O8 Product Profit Margin** |  |  |  |  |  |
| Produced% | 53.6% | 0.0% | 32.4% | 20.7% | 25.7% |
| Purchased% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| **%** | **53.6%** | **0.0%** | **32.4%** | **20.7%** | **25.7%** |

28

#### Table of Contents

We sold a total of 175,000 pounds of U3O8 in the nine months ended September 30, 2024 at an average price per pound sold of $61.65. The average cost per pound sold was $45.82 for the nine months ended September 30, 2024, which resulted in an average profit per pound sold of $15.83 and an average profit margin of approximately 26%.

In the nine months ended September 30, 2023, the average price per pound sold into contracts was $62.56 and the average cost per pound sold was $32.38, which resulted in an average profit per pound sold of $30.18 and an average profit margin of approximately 48%. Higher average prices per pound and lower average costs per pound resulted in higher average profits per pound sold in 2023 as compared to 2024. As noted above, the produced pounds that were sold in 2023 had been produced in earlier years with higher production rates and lower average costs per pound produced.

### U3O8 Production and Ending Inventory

The following table provides information on our production and ending inventory of U3O8 pounds.

| U3O8 Production | Unit | 2023 Q4 | 2024 Q1 | 2024 Q2 | 2024 Q3 | 2024 YTD |
| --- | --- | ---: | ---: | ---: | ---: | ---: |
| Pounds captured | lb | 68,448 | 38,221 | 70,679 | 75,075 | 183,975 |
| Pounds drummed | lb | 6,519 | 39,229 | 64,170 | 71,804 | 175,203 |
| Pounds shipped | lb | - | 35,445 | 70,390 | 67,488 | 173,323 |
| **U3O8 Ending Inventory** |  |  |  |  |  |  |
| **Pounds** |  |  |  |  |  |  |
| In-process inventory | lb | 82,033 | 80,465 | 86,204 | 90,140 |  |
| Plant inventory | lb | 22,278 | 26,062 | 21,570 | 26,580 |  |
| Conversion inventory - produced | lb | 43,790 | 79,235 | 74,625 | 40,713 |  |
|  | **lb** | **148,101** | **185,762** | **182,399** | **157,433** |  |
| **Value** |  |  |  |  |  |  |
| In-process inventory | $000 | - | - | 447 | 427 |  |
| Plant inventory | $000 | 1,343 | 1,593 | 1,072 | 1,499 |  |
| Conversion inventory - produced | $000 | 1,228 | 3,105 | 3,555 | 2,320 |  |
|  | $000 | **2,571** | **4,698** | **5,074** | **4,246** |  |
| **Cost per Pound** |  |  |  |  |  |  |
| In-process inventory | $/lb | - | - | 5.19 | 4.74 |  |
| Plant inventory | $/lb | 60.28 | 61.12 | 49.70 | 56.40 |  |
| Conversion inventory - produced | $/lb | 28.04 | 39.19 | 47.64 | 56.98 |  |
| Conversion inventory detail |  |  |  |  |  |  |
| Ad valorem and severance tax | $/lb | 0.59 | 0.53 | 0.67 | 1.63 |  |
| Cash cost | $/lb | 18.60 | 28.47 | 36.77 | 45.26 |  |
| Non-cash cost | $/lb | 8.85 | 10.19 | 10.20 | 10.09 |  |
|  | **$/lb** | **28.04** | **39.19** | **47.64** | **56.98** |  |

29

#### Table of Contents

Wellfield production at Lost Creek resumed in 2023 Q2 and pounds captured increased in each subsequent quarter, except in 2024 Q1 when drying issues at the plant slowed our ability to capture pounds. We captured 75,075 pounds in 2024 Q3.

Plant production at Lost Creek resumed in 2023 Q3. Drying operations encountered labor and equipment issues that reduced plant throughput in 2023 Q4. The equipment issues were addressed, and pounds dried increased in each subsequent quarter. We dried 71,804 pounds in 2024 Q3. Despite the quarterly increases, drying operations have not reached targeted levels due to maintenance and manpower issues.

There were no shipments in 2023. The first shipment of U3O8 to the conversion facility since the return to commercial operations was completed in 2024 Q1, when 35,445 pounds were delivered to the conversion facility. During 2024 Q2, two shipments totaling 70,390 pounds U3O8 were shipped to the conversion facility. We shipped another two shipments totaling 67,488 pounds U3O8 in 2024 Q3. In October 2024, we made two shipments to the conversion facility totaling 46,601 pounds U3O8.

We ended the quarter with 90,140 pounds in process, 26,580 drummed pounds in the plant, and 40,713 pounds at the conversion facility.

Because production rates were low during the initial ramp up period, the cost per pound to produce inventory exceeded its NRV. The NRV adjustments decreased from $2.5 million in 2023 Q4 to $1.1 million in 2024 Q1 and decreased again to $0.2 million in 2024 Q2. The NRV adjustment increased in 2024 Q3 to $0.7 million primarily due to higher production cost during the period.

The cost per pound at the conversion facility increased during the quarter reflecting the higher cost per pound of the drummed inventory shipped to the conversion facility in 2024. As production and shipments continue to increase to targeted levels, we expect the cost per pound in ending inventory and ultimately the cost per pound sold to level off and then decrease accordingly.

30

#### Table of Contents

### Three and nine months ended September 30, 2024, compared to the three and nine months ended September 30, 2023

The following table summarizes the results of operations for the three and nine months ended September 30, 2024 and 2023 (in thousands of U.S. dollars, except per share and per pound data):

|  | Three Months Ended September 30, 2024 | 2023 | Change | Nine Months Ended September 30, 2024 | 2023 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Sales | 6,400 | 5,752 | 648 | 11,053 | 12,238 | (1,185) |
| Cost of sales | (5,613) | (4,855) | (758) | (10,079) | (14,310) | 4,231 |
| **Gross profit (loss)** | **787** | **897** | **(110)** | **974** | **(2,072)** | **3,046** |
| Operating costs | (12,650) | (11,289) | (1,361) | (40,528) | (20,373) | (20,155) |
| **Operating loss** | **(11,863)** | **(10,392)** | **(1,471)** | **(39,554)** | **(22,445)** | **(17,109)** |
| Net interest income | 1,220 | 406 | 814 | 2,288 | 1,079 | 1,209 |
| Warrant liability revaluation gain (loss) | 2,968 | (7,216) | 10,184 | 4,442 | (4,155) | 8,597 |
| Foreign exchange gain | 6 | 13 | (7) | 22 | 335 | (313) |
| Other gain (loss), net | (333) | 2 | (335) | (325) | 2 | (327) |
| **Net loss** | **(8,002)** | **(17,187)** | **9,185** | **(33,127)** | **(25,184)** | **(7,943)** |
| Foreign currency translation adjustment | (23) | 144 | (167) | 358 | (290) | 648 |
| **Comprehensive loss** | **(8,025)** | **(17,043)** | **9,018** | **(32,769)** | **(25,474)** | **(7,295)** |
| Loss per common share: |  |  |  |  |  |  |
| Basic | (0.02) | (0.07) | 0.05 | (0.11) | (0.10) | (0.01) |
| Diluted | (0.02) | (0.07) | 0.05 | (0.11) | (0.10) | (0.01) |
| U3O8 pounds sold | 100,000 | 90,000 | 10,000 | 175,000 | 190,000 | (15,000) |
| U3O8 price per pound sold | 61.65 | 60.44 | 1.21 | 61.65 | 62.56 | (0.91) |
| U3O8 cost per pound sold | 48.91 | 28.04 | 20.87 | 45.82 | 32.38 | 13.44 |
| U3O8 product profit per pound sold | 12.74 | 32.40 | (19.66) | 15.83 | 30.18 | (14.35) |

### Sales

Sales per the financial statements includes the U3O8 sales and disposal fees.

In 2024 Q3, we had one sale and delivered 100,000 pounds of U3O8 at an average price of $61.65 per pound. Through September, we have delivered a total of 175,000 pounds at an average price of $61.65. For the year, our total sales are projected at 570,000 pounds of U3O8 at an average price of $58.15 per pound and we expect to realize revenues of $33.1 million.

Due to the nature of our contracts, we have a limited number of deliveries, which do not occur consistently during the year. Sales revenues are recognized when the product is transferred to the purchaser.

31

#### Table of Contents

### Cost of Sales

Cost of sales per the financial statements includes U3O8 costs of sales and lower of cost or NRV adjustments and consists of the following (in thousands of U.S. dollars):

|  | Three Months Ended September 30, 2024 | 2023 | Change | Nine Months Ended September 30, 2024 | 2023 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| U3O8 product cost | 4,891 | 2,523 | 2,368 | 8,018 | 6,152 | 1,866 |
| Lower of cost or NRV adjustments | 722 | 2,332 | (1,610) | 2,061 | 8,158 | (6,097) |
|  | **5,613** | **4,855** | **758** | **10,079** | **14,310** | **(4,231)** |

Excluding NRV adjustments, the cost of product sales was $4.9 million and $8.0 million, and $2.5 million and $6.2 million, for the three and nine months ended September 30, 2024, and 2023, respectively. In the three months ended September 30, 2024, we sold 100,000 pounds at $61.65 as compared to 90,000 pounds at $60.44 in the comparable 2023 period. For the nine months ended September 30, 2024, the sales of 175,000 pounds in 2024 were at an average cost of $45.82 per pound. The sales of 190,000 pounds in 2023 were at an average cost of $32.38 per pound. The 2023 sales were made with a combination of pre-ramp up produced and purchased pounds the Company already had in its finished inventory at the conversion facility. The produced pounds were inventoried in earlier years with higher production rates and lower average costs per pound produced. The pounds sold in 2024 were primarily from more expensive post ramp up production.

Cost of sales for the three and nine months ended September 30, 2024 included $0.7 million and $2.1 million of NRV adjustments, respectively. Cost of sales for the three and nine months ended September 30, 2023 included NRV adjustments of $2.3 million and $8.2 million, respectively. The decrease is attributable to increased production for the respective periods. The current NRV adjustments are due to increased production costs in combination with lower than anticipated production thus far in 2024.

### Gross Profit (Loss)

Gross profit (loss) is based on sales, which includes disposal fees, and cost of sales, which includes NRV adjustments. As we had sales during the three months ended September 30, 2024 and 2023, we recognized a gross profit for each period. For the nine months ended September 30, 2024, our net profit from sales exceeded our NRV adjustments as the latter has been greatly reduced due to increases in production. For the nine months ended September 30, 2023, our initial production levels were low, which resulted in higher NRV adjustments and a gross loss for the period.

### Operating Costs

The following table summarizes the operating costs for the three and nine months ended September 30, 2024 and 2023:

| Operating Costs | Three Months Ended September 30, 2024 | 2023 | Change | Nine Months Ended September 30, 2024 | 2023 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Exploration and evaluation | 934 | 512 | 422 | 2,862 | 1,687 | 1,175 |
| Development (see below) | 10,088 | 9,339 | 749 | 31,730 | 13,577 | 18,153 |
| General and administration | 1,397 | 1,314 | 83 | 5,418 | 4,738 | 680 |
| Accretion | 231 | 124 | 107 | 518 | 371 | 147 |
|  | **12,650** | **11,289** | **1,361** | **40,528** | **20,373** | **20,155** |

32

#### Table of Contents

Total operating costs increased $1.4 million and $20.2 million in the three and nine months ended September 30, 2024 as compared to 2023, respectively. The increases were mainly due to development costs at Lost Creek as the ramp up to operations began in 2023 and has continued throughout 2024. In addition, we constructed an additional disposal well at Lost Creek and initiated drilling and site construction activities at our Shirley Basin project which we expect to complete in late 2025.

Exploration and evaluation expense consists of labor and the associated costs of the exploration, evaluation, and regulatory departments, as well as land holding and exploration costs on properties that have not reached the development or operations stage. The increases in cost of $0.4 million and $1.2 million for the three and nine months ended September 30, 2024, respectively, were driven by increases in outside service costs and labor costs for additional staffing.

The Company is considered an exploration stage issuer and expenses its pre-production development costs. As noted above, these development costs are incurred in advance of production from the related mining areas. Development expense includes costs incurred at the Lost Creek Project not directly attributable to current production activities, including wellfield construction, drilling, and development costs. It also includes costs incurred at the Shirley Basin Project not directly attributable to the construction of the capitalizable assets of the project, including the installation of the wellfield monitor well ring and other development costs. The following table summarizes the development costs included in operating costs for the three and nine months ended September 30, 2024 and 2023:

| Development Costs | Three Months Ended September 30, 2024 | 2023 | Change | Nine Months Ended September 30, 2024 | 2023 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Lost Creek mine unit development | 8,675 | 5,217 | 3,458 | 24,999 | 8,849 | 16,150 |
| Lost Creek disposal well development | 132 | 3,922 | (3,790) | 4,106 | 4,089 | 17 |
| Shirley Basin mine development | 1,281 | 139 | 1,142 | 2,548 | 503 | 2,045 |
| Other development | - | 61 | (61) | 77 | 136 | (59) |
|  | **10,088** | **9,339** | **749** | **31,730** | **13,577** | **18,153** |

Development expenses increased approximately $0.7 million and $18.2 million in the three and nine months ended September 30, 2024, respectively. The increases were driven by increased drilling activities and the related wellfield construction costs that relate to the mine unit (“MU”) two development program at Lost Creek. In addition, development costs in 2023 and 2024 also included $7.7 million in direct costs primarily related to the construction of a new disposal well at Lost Creek. At Shirley Basin, we incurred approximately $1.3 million and $2.5 million development costs in the three and nine months ended September 30, 2024, respectively. Development activities at Shirley Basin included drilling costs related to the installation of the first monitor well ring.

General and administration expenses relate to the administration, finance, investor relations, land, and legal functions, and consist principally of personnel, facility, and support costs. For the three and nine months ended September 30, 2024, the expenses increased $0.1 million and increased $0.7 million, respectively. The increases for the nine months were driven by higher labor costs, insurance costs, and stock compensation expense.

### Other Income and Expenses

Higher interest rates and cash balances have generated significant interest income in 2024. At the same time, interest expense decreased after the Company paid off the Wyoming state bond loan in March 2024.

33

#### Table of Contents

For the three months and nine months ended September 30, 2024, the warrant liability revaluation resulted in $3.0 and $4.4 million gains, compared to $7.2 and $4.2 million losses in 2023, respectively. As a part of the February 2021 and February 2023 underwritten public offerings, we issued warrants that were priced in U.S. dollars. The changes in liability are primarily related to the share price of the company’s stock which is a significant factor in the Black-Scholes computations.

### Earnings (loss) per Common Share

The basic and diluted losses per common share for the three and nine months ended September 30, 2024, were $0.02 and $0.11, respectively. For the three and nine months ended September 30, 2023 the losses were $0.07 and $0.10 per share. The diluted loss per common share is equal to the basic loss per common share due to the anti-dilutive effect of all convertible securities in periods of loss.

### Liquidity and Capital Resources

As shown in the Interim Consolidated Statements of Cash Flow, our cash, cash equivalents, and restricted cash and cash equivalents increased from the December 31, 2023 balance of $68.2 million to $129.4 million as of September 30, 2024. Cash resources consist of Canadian and U.S. dollar denominated deposit and money market accounts, and U.S. treasury fund investments. During the nine months ended September 30, 2024, we spent $32.5 million on operating activities, used $5.7 million on investing activities, and generated $99.3 million from financing activities.

Accounts payable included $1.4 million of insurance and surety bond expenses and $0.6 million in equipment purchases at September 30, 2024. Accounts payable included $0.2 million in equipment purchases at December 31, 2023. As these did not affect cash balances at the respective dates, they have been adjusted on the Statement of Cash Flow.

During the nine-month period, we sold 175,000 pounds of U3O8 for $10.8 million, received $0.3 million in disposal fees, and generated $2.4 million from interest income, net of loan interest expense of $0.1 million. We spent $9.8 million on production-related cash costs, $37.0 million on operating costs, and had a $0.8 million favorable working capital movement primarily related to increases in accounts payable and accrued liabilities.

Investing activities used $5.7 million during the nine months ended September 30, 2024. We spent $2.8 million on construction and equipment at Shirley Basin and $2.9 million for vehicles and equipment. The vehicles and equipment will be used primarily at Lost Creek.

Financing activities provided $99.3 million in the nine months ended September 30, 2024. In July, we closed an equity financing by issuing 65,722,500 shares including an 8,572,000 overallotment at $1.05 per share for net proceeds after commissions and fees of $65.2 million. We received net proceeds of $27.7 million from the sale of common shares through our At Market Facility, and $12.3 million from the exercise of warrants and stock options. We spent $5.7 million on the Wyoming bond loan, ultimately paying off the loan in March 2024, and $0.2 million on lease payments.

### Wyoming State Bond Loan

On October 23, 2013, we closed a $34.0 million Sweetwater County, State of Wyoming, Taxable Industrial Development Revenue Bond financing program loan (“State Bond Loan”). The State Bond Loan called for payments of interest at a fixed rate of 5.75% per annum on a quarterly basis, which commenced January 1, 2014. The principal was to be payable in 28 quarterly installments, which commenced January 1, 2015.

34

#### Table of Contents

During the term of the State Bond Loan, the Sweetwater County Commissioners and the State of Wyoming approved two separate deferrals of principal payments during the downturn in the uranium market and our period of reduced production operations. Following those deferrals, quarterly principal payments resumed on October 1, 2022, and were scheduled to continue until October 1, 2024.

On March 27, 2024, the remaining $4.4 million balance due on the State Bond Loan was prepaid in full. The State Bond Loan was secured by all the assets of the Lost Creek Project. All releases of collateral have been obtained following the final repayment of the facility.

### Universal Shelf Registration and At Market Facility

On May 29, 2020, we entered into an At Market Issuance Sales Agreement (the “Sales Agreement”) with B. Riley Securities, Inc. (“B. Riley Securities”), relating to our common shares. On June 7, 2021, we amended and restated the Sales Agreement to include Cantor Fitzgerald & Co. (“Cantor,” and together with B. Riley Securities, the “Agents”) as a co-agent. Under the Sales Agreement, as amended, we may, from time to time, issue and sell Common Shares at market prices on the NYSE American or other U.S. market through the agents for aggregate sales proceeds of up to $50 million. The Sales Agreement was filed in conjunction with a universal shelf registration statement on Form S-3, effective May 27, 2020, which has now expired.

On November 23, 2021, we filed a new universal shelf registration statement on Form S-3 with the SEC through which we may offer and sell, from time to time, in one or more offerings, at prices and terms to be determined, up to $100 million of our common shares, warrants to purchase our common shares, our senior and subordinated debt securities, and rights to purchase our common shares and/or senior and subordinated debt securities. The registration statement became effective December 17, 2021, for a three-year period.

On December 17, 2021, we entered into an amendment to the Sales Agreement (“Amendment No. 1” and together with the Sales Agreement, the “Amended Sales Agreement”) with the Agents to, among other things, reflect the new registration statement under which we may sell up to $50 million from time to time through or to the Agents under the Amended Sales Agreement, in addition to amounts previously sold under the Sales Agreement. In February 2023, in conjunction with our underwritten public offering, we filed a prospectus supplement by which we decreased the amount of common stock offered pursuant to the Amended Sales Agreement.

On June 28, 2023, we filed a new universal shelf registration statement on Form S-3 with the SEC through which we may offer and sell, from time to time, in one or more offerings, at prices and terms to be determined, up to $175 million of our common shares, warrants to purchase our common shares, our senior and subordinated debt securities, and rights to purchase our common shares and/or senior and subordinated debt securities. The registration statement became effective July 19, 2023, for a three-year period.

On July 19, 2023, we entered into a further amendment to the Amended Sales Agreement (“Amendment No. 2” and hereafter the “Amended Sales Agreement”) with the Agents to, among other things, reflect the new registration statement under which we may sell up to $50 million from time to time through or to the Agents under the Amended Sales Agreement, in addition to amounts previously sold under the Sales Agreement. Subsequently, we filed a new prospectus supplement in June 2024 under which we may sell up to $100 million from time to time through or to the Agents under the Amended Sales Agreement, including the common shares previously sold under the Sales Agreement.

35

#### Table of Contents

For the nine months ended September 30, 2024, we utilized the Amended Sales Agreement for gross proceeds of $28.6 million from sales of 16,939,825 common shares.

### 2023 Underwritten Public Offering

On February 21, 2023, the Company closed a $46.1 million underwritten public offering of 39,100,000 common shares and accompanying warrants to purchase up to 19,550,000 common shares, at a combined public offering price of $1.18 per common share and accompanying warrant. The gross proceeds to Ur‑Energy from this offering were approximately $46.1 million. After fees and expenses of $3.0 million, net proceeds to the Company were approximately $43.1 million.

### 2024 Underwritten Public Offering

On July 29, 2024, the Company closed an underwritten public offering of 57,150,000 common shares at a price of $1.05 per common share. The Company also granted the underwriters a 30-day option to purchase up to 8,572,500 additional common shares on the same terms. The option was exercised in full. Including the exercised option, the Company issued a total of 65,722,500 common shares. The gross proceeds to the Company from this offering were approximately $69.0 million. After fees and expenses of $3.8 million, net proceeds to the Company were approximately $65.2 million.

### Liquidity Outlook

As of October 30, 2024, our unrestricted cash position was $110.3 million.

We expect to realize revenues of $33.1 million from the sale of 570,000 pounds of U3O8 to be delivered in 2024. We had 40,713 pounds of conversion facility inventory on September 30, 2024. We delivered 100,000 pounds into sales contracts in August 2024. As of October 30, 2024, we had 87,314 pounds of U3O8 in our conversion facility inventory. We expect to deliver 395,000 pounds U3O8 in 2024 Q4 from production at Lost Creek and other available sources.

Our unrestricted cash position and expected proceeds from uranium sales are expected to cover production and development costs of the continuing ramp up of production at Lost Creek, ongoing corporate overhead, and development and construction expenditures at Shirley Basin.

We expect the planned development and construction of the Shirley Basin Project in 2025 and 2026 will be funded by operating cash flow, cash on hand, or additional financing as required. We have no immediate plans to issue additional securities or obtain funding, however, we may issue additional debt or equity securities at any time.

### Looking Ahead

With eight operational Header Houses (HHs) in MU2, we continue our ramp up toward target production levels and steady state operations at Lost Creek. To facilitate ongoing increases in production levels, we anticipate increasing our drill rig count through the end of the year to approximately 20 rigs. Fabrication of HHs 2-13 through 2-15 is in progress in our Casper construction shop and onsite construction related to these next header houses continues to advance. HH 2-15 is a newly planned production area for which we are advancing development and construction. We are also drilling in MU1 for the next phase of its production.

Because of continuing challenges of ramp-up at Lost Creek, we now anticipate 2024 production will be in a range between 240,000 and 280,000 pounds U3O8 captured on IX resin.

36

#### Table of Contents

We have commitments under contracts negotiated in 2022, when the long-term price was between $43 and $52 per pound, for deliveries of 570,000 pounds U3O8 in 2024 and expect to realize revenues of $33.1 million. We anticipate making our remaining deliveries of 395,000 pounds U3O8 during Q4 with Lost Creek production and other available alternatives.

During the quarter, uranium spot prices softened to an average of approximately $82 per pound U3O8. However, average term pricing, which has increased steadily for several years now, reached approximately $81 per pound U3O8 during the quarter.

Term pricing has been supported by continued requests for proposals (“RFPs”) in the market from utilities and other global fuel buyers. We have responded to the RFPs with prices commensurate with rising market conditions including increased demand for domestically produced uranium. Our contract book now includes agreements with six leading nuclear fuel purchasers, with commitments of approximately 5.7 million pounds U3O8 with deliveries occurring in 2024 through 2030. Sales prices are anticipated to be profitable on an all-in production cost basis and escalate annually from initial pricing, including some market-based pricing features.

We are progressing the buildout of a satellite facility at our wholly owned, fully permitted and licensed Shirley Basin Project in Carbon County, Wyoming. The buildout will nearly double our annual permitted mine production to 2.2 million pounds U3O8.

At October 30, 2024, our unrestricted cash position was $110.3 million. With this strong treasury, we are well funded for continuing construction at Shirley Basin.

Installation of the monitor wells for the first mine unit at Shirley Basin is complete. We have commenced the pump test program, which remains on schedule to be completed this year. Road construction is complete and the refurbishment of existing and installation of new electric infrastructure are all advancing. Renovation of existing buildings has begun. Major construction activities at Shirley Basin are expected to begin in 2025 and initial production is expected to commence in early 2026.

We are pleased to be one of the few publicly traded companies that is commercially recovering uranium and working to expand our production capacity to sell into a sustained stronger uranium market.

We will continue to closely monitor the uranium markets, and other developments, which may affect the uranium production industry and provide the opportunity to put in place additional off-take sales contracts.

As always, we will focus on maintaining safe and compliant operations.

### Transactions with Related Parties

There were no reportable transactions with related parties during the quarter.

37

#### Table of Contents

### Proposed Transactions

As is typical of the mineral exploration, development, and mining industry, we will consider and review potential merger, acquisition, investment and venture transactions and opportunities that could enhance shareholder value. Timely disclosure of such transactions is made as soon as reportable events arise.

### Critical Accounting Policies and Estimates

We have established the existence of uranium resources at the Lost Creek Property, but because of the unique nature of in situ recovery mines, we have not established, and have no plans to establish, the existence of proven and probable reserves at this project. Accordingly, we have adopted an accounting policy with respect to the nature of items that qualify for capitalization for in situ U3O8 mining operations to align our policy to the accounting treatment that has been established as best practice for these types of mining operations.

The development of the wellfield includes injection, production and monitor well drilling and completion, piping within the wellfield and to the processing facility and header houses used to monitor production and disposal wells associated with the operation of the mine. These costs are expensed when incurred.

#### Mineral Properties

Acquisition costs of mineral properties are capitalized. When production is attained at a property, these costs will be amortized over an estimated benefit period.

Development costs including, but not limited to, production wells, header houses, piping and power will be expensed as incurred as we have no proven and probable reserves.

#### Inventory and Cost of Sales

Our inventories are valued at the lower of cost or net realizable value based on projected revenues from the sale of that product. We are allocating all costs of operations of the Lost Creek facility to the inventory valuation at various stages of production except for wellfield and disposal well costs which are treated as development expenses when incurred. Depreciation of facility enclosures, equipment, and asset retirement obligations as well as amortization of the acquisition cost of the related property is also included in the inventory valuation.

#### Share-Based Expense and Warrant Liability

We are required to initially record all equity instruments including warrants, restricted share units and stock options at fair value in the financial statements.

Management utilizes the Black-Scholes model to calculate the fair value of the warrants and stock options at the time they are issued. In addition, the fair value of derivative warrant liability is recalculated monthly using the Black-Scholes model with any gain or loss being reflected in the net income for the period. Use of the Black-Scholes model requires management to make estimates regarding the expected volatility of the Company’s stock over the future life of the equity instrument, the estimate of the expected life of the equity instrument and the number of options that are expected to be forfeited. Determination of these estimates requires significant judgment and requires management to formulate estimates of future events based on a limited history of actual results.

The fair value of the restricted share units is based on the intrinsic method, which uses the closing price of the common shares on the trading day immediately preceding the date of the grant.

38

#### Table of Contents

#### Impairment of long-lived assets

The Company assesses the possibility of impairment in the net carrying value of its long-lived assets when events or circumstances indicate that the carrying amounts of the asset or asset group may not be recoverable. When potential impairment is indicated, management calculates the estimated undiscounted future net cash flows relating to the asset or asset group using estimated future prices, recoverable resources, operating, capital, and reclamation costs. When the carrying value of an asset exceeds the related undiscounted cash flows, the asset is written down to its estimated fair value, which is determined using discounted future net cash flows, or other measures of fair value.

### Off Balance Sheet Arrangements

We have not entered into any material off balance sheet arrangements such as guaranteed contracts, contingent interests in assets transferred to unconsolidated entities, derivative instrument obligations, or with respect to any obligations under a variable interest entity arrangement.

### Outstanding Share Data

As of October 30, 2024, we had outstanding 364,101,038 common shares and 6,695,123 options to acquire common shares.

## Market risk

As filed, 2,698 characters.

### Market risk

Market risk is the risk to the Company of adverse financial impact due to changes in the fair value or future cash flows of financial instruments because of fluctuations in interest rates and foreign currency exchange rates.

#### Credit risk

Financial instruments that potentially subject the Company to concentrations of credit risk consist of cash and cash equivalents, and restricted cash and cash equivalents. These assets include Canadian dollar and U.S. dollar denominated certificates of deposit, money market accounts, and demand deposits. These instruments are maintained at financial institutions in Canada and the U.S. Of the amount held on deposit, approximately $0.6 million is covered by the Canada Deposit Insurance Corporation, the Securities Investor Protection Corporation, or the U.S. Federal Deposit Insurance Corporation, leaving approximately $128.7 million at risk on September 30, 2024, should the financial institutions with which these amounts are invested be rendered insolvent. The Company considers any expected credit losses on its financial instruments to be nominal as of September 30, 2024.

#### Currency risk

As of September 30, 2024, we maintained a balance of approximately $2.5 million Canadian dollars. The funds will be used to pay Canadian dollar expenses and are considered to be a low currency risk to the Company.

39

#### Table of Contents

#### Liquidity risk

Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they come due. As of September 30, 2024, the Company’s financial liabilities consisted of accounts payable and accrued liabilities of $7.1 million, and the current portion of lease liability of $0.3 million. As of September 30, 2024, the Company had $118.5 million of cash and cash equivalents.

#### Interest rate risk

The Company has completed a sensitivity analysis to estimate the impact that a change in interest rates would have on the net loss and considers the change to be a low interest rate risk to the Company.

### Commodity Price Risk

The Company is subject to market risk related to the market price of uranium. Future sales would be impacted by both spot and long-term uranium price fluctuations. Historically, uranium prices have been subject to fluctuation, and the price of uranium has been and will continue to be affected by numerous factors beyond our control, including the demand for nuclear power, political and economic conditions, governmental legislation in uranium producing and consuming countries, and production levels and costs of production of other producing companies. The average spot market price was $80.38 per pound U3O8 as of October 30, 2024.

## Controls and procedures

As filed, 1,664 characters.

### (a) Evaluation of Disclosure Controls and Procedures

As of the end of the period covered by this MD&A, under the supervision of the Chief Executive Officer and the Chief Financial Officer, the Company evaluated the effectiveness of its disclosure controls and procedures, as such term is defined in Rule 13a-15(e) and Rule 15d-15(e) under the Securities Exchange Act of 1934 (the “Exchange Act”). Based on this evaluation, the Chief Executive Officer and the Chief Financial Officer have concluded that the Company’s disclosure controls and procedures are effective to ensure that information the Company is required to disclose in reports that are filed or submitted under the Exchange Act: (1) is recorded, processed and summarized effectively and reported within the time periods specified in SEC rules and forms, and (2) is accumulated and communicated to Company management, including the Chief Executive Officer and the Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure. The Company’s disclosure controls and procedures include components of internal control over financial reporting. No matter how well designed and operated, internal controls over financial reporting can provide only reasonable, but not absolute, assurance that the control system's objectives will be met.

### (b) Changes in Internal Controls over Financial Reporting

No changes in our internal control over financial reporting occurred during the three months ended September 30, 2024, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

40

#### Table of Contents

## Risk factors

As filed, 130 characters.

As of September 30, 2024, there have been no material changes from those risk factors set forth in our Annual Report on Form 10-K.

Filed Nov 6, 2024.
Source: SEC EDGAR, the filing index for accession 0001654954-24-013836. Last ingested by Listed: Nov 13, 2026, 16:40 ET. No prices; not investment advice.
