# Venture Global, Inc.: Form 10-Q for the period ended Mar 31, 2025

- Company: [Venture Global, Inc.](/companies/vg.md) (CIK 2007855)
- Form: 10-Q
- Filed: 2025-05-13
- Accepted by EDGAR: May 12, 2025, 18:18 ET
- Period: 2025-03-31
- Accession: 0002007855-25-000018
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/2007855/000200785525000018/vg-20250331.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/2007855/000200785525000018/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2025-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2025-01-01 to 2025-03-31 | $2.89bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Research and development | 3 months, 2025-01-01 to 2025-03-31 | $182.0m | us-gaap:ResearchAndDevelopmentExpense |
| Operating income | 3 months, 2025-01-01 to 2025-03-31 | $1.08bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2025-01-01 to 2025-03-31 | $276.0m | us-gaap:InterestExpenseNonoperating |
| Income tax | 3 months, 2025-01-01 to 2025-03-31 | $151.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2025-01-01 to 2025-03-31 | $517.0m | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2025-01-01 to 2025-03-31 | $0.15 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2025-01-01 to 2025-03-31 | $0.17 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2025-01-01 to 2025-03-31 | 2,643,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2025-01-01 to 2025-03-31 | $1.11bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2025-01-01 to 2025-03-31 | $3.47bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2025-01-01 to 2025-03-31 | $190.0m | us-gaap:PaymentsOfDividends |
| Cash and equivalents | at 2025-03-31 | $3.60bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2025-03-31 | $4.89bn | us-gaap:AssetsCurrent |
| Total assets | at 2025-03-31 | $45.05bn | us-gaap:Assets |
| Current liabilities | at 2025-03-31 | $2.82bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2025-03-31 | $35.13bn | us-gaap:Liabilities |
| Long-term debt | at 2025-03-31 | $29.13bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2025-03-31 | $193.0m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2025-03-31 | $4.88bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 36,395 characters.

The condensed consolidated financial statements and the accompanying notes thereto, included in Item 1.—*Financial Statements* of this Form 10-Q, and discussion and analysis of our financial condition and results of operations should be read in conjunction with our 2024 Form 10-K. In addition to historical condensed consolidated financial information, this Form 10-Q contains forward-looking statements that reflect our plans, estimates, and beliefs that involve significant risks and uncertainties. Our actual results could differ materially from those discussed in the forward-looking statements. Factors that could cause or contribute to those differences include those discussed below and in the Cautionary Statement on Forward Looking Statements on this Form 10-Q and elsewhere in Item 1A.—*Risk Factors* of our 2024 Form 10-K. Except for per share, per MMBtu or volumetric amounts, or as otherwise specified, dollar amounts presented within tables are stated in millions.

### Executive Summary

**Our Financial Results.** Our income from operations for the three months ended March 31, 2025 was $1.1 billion, a $463 million increase from $617 million for the corresponding period in the prior year. This increase was primarily due to higher sales volumes at our Plaquemines Project LNG facility due to the commencement of LNG production in December 2024 and continued ramp up and higher weighted average prices of LNG, partially offset by higher cost of feed gas. Additionally, our net income for the three months ended March 31, 2025 was $517 million, a reduction of $181 million from $698 million for the corresponding period in the prior year primarily due to an unfavorable change in the fair value of our interest rate swaps of $566 million, partially offset by our increase in income from operations.

| LNG volumes exported | Three months ended March 31, 2025 | 2024 |
| --- | ---: | ---: |
| Cargos | 63 | 40 |
| TBtu | 233.6 | 144.5 |
| LNG volumes sold (TBtu) | 228.3 | 140.9 |
| Weighted average price of LNG volumes sold (per MMBtu) |  |  |
| Fixed liquefaction fee | $8.55 | $7.40 |
| Commodity fee | 4.23 | 2.59 |
| Weighted average price of LNG volumes sold | $12.78 | $9.99 |

### Our LNG Projects

***Calcasieu Project***. Production and sales of LNG from our initial LNG export facility remained ongoing, although not at full nameplate capacity levels, while we continued to address the remaining work related to commissioning, carryover completions, rectification, reliability testing, and other incomplete aspects of the facility. Notably, in March 2025, we completed certain outstanding performance tests of key equipment and facilities and commenced our facility-wide lenders' reliability test. On April 15, 2025, the Calcasieu Project declared COD and commenced the sale of LNG to its customers under its post-COD SPAs.

| LNG volumes exported | Calcasieu Project Three months ended March 31, 2025 | 2024 |
| --- | ---: | ---: |
| Cargos | 34 | 40 |
| TBtu | 125.9 | 144.5 |
| LNG volumes sold (TBtu) | 125.2 | 140.9 |
| Weighted average price of LNG volumes sold (per MMBtu) |  |  |
| Fixed liquefaction fee | $8.80 | $7.40 |
| Commodity fee | 4.23 | 2.59 |
| Weighted average price of LNG volumes sold | $13.03 | $9.99 |

***Plaquemines Project***. Production and sales of LNG from the first phase of our second LNG export facility increased during the period while physical construction and the commissioning program of the project remained underway. During the period, we incurred $1.3 billion of project costs, the majority of which were capitalized, and we placed an additional $4.4 billion of assets in service in accordance with the accounting guidance.

| LNG volumes exported | Plaquemines Project Three months ended March 31, 2025 | 2024 |
| --- | ---: | ---: |
| Cargos | 29 | — |
| TBtu | 107.7 | — |
| LNG volumes sold (TBtu) | 107.7 | — |
| Weighted average price of LNG volumes sold (per MMBtu) |  |  |
| Fixed liquefaction fee | $7.26 | $— |
| Commodity fee | 4.26 | — |
| Weighted average price of LNG volumes sold | $11.52 | $— |

***CP2 Project***. We significantly advanced the development of our third LNG export facility during the period and incurred $834 million of project costs primarily associated with equipment procurement, off-site manufacturing work, and engineering and design, $685 million of which was capitalized and $149 million was expensed. We continued to see positive change in the CP2 Project’s regulatory landscape:

- *FERC authorization*. In February 2025, FERC prepared its draft supplemental EIS, and on May 9, 2025, issued its final supplemental EIS which reaffirmed that the CP2 Project emissions impacts are “not significant.” The CP2 Project awaits its final approval and notices to proceed with on-site construction from the FERC commission, both of which are expected in mid-2025.
- *DOE non-FTA authorization*. In March 2025, the CP2 Project received conditional authorization from the DOE to export natural gas to non-FTA nations.

**Our Sources of Capital**. In January 2025, we completed our IPO, issuing 70 million shares of our Class A common stock at a public offering price of $25.00 per share for total net proceeds of $1.7 billion. In connection with the IPO, we effectuated a 4,520.3317-for-one forward stock split of our Class A common stock. In April 2025, VGPL closed on its inaugural bond offering, issuing $2.5 billion of aggregate senior secured notes, and concurrently settled a pro rata portion of its interest rate swaps for cash proceeds of $275 million. Net proceeds from this issuance and the swap breakage proceeds were used to prepay $2.7 billion of principal outstanding under the Plaquemines Construction Term Loan. Additionally, in May 2025, CP2 entered into the new CP2 Bridge Facilities totaling $3.0 billion. The net proceeds from the CP2 Bridge Facilities will be used to fund a portion of the development and construction costs, including interest, of the CP2 Project prior to closing the full project debt and equity financing.

### Results of Operations

### Three months ended March 31, 2025 compared to three months ended March 31, 2024

The following table shows a summary of our condensed consolidated results of operations for the periods indicated:

|  | Three months ended March 31, 2025 | 2024 | Change ($) | (%) |
| --- | ---: | ---: | ---: | ---: |
| **REVENUE** | $2,894 | $1,414 | $1,480 | 105% |
| **OPERATING EXPENSE** |  |  |  |  |
| Cost of sales (exclusive of depreciation and amortization shown separately below) | 1,059 | 365 | 694 | 190% |
| Operating and maintenance expense | 252 | 109 | 143 | 131% |
| General and administrative expense | 105 | 72 | 33 | 46% |
| Development expense | 182 | 181 | 1 | 1% |
| Depreciation and amortization | 216 | 70 | 146 | 209% |
| Total operating expense | 1,814 | 797 | 1,017 | 128% |
| **INCOME FROM OPERATIONS** | 1,080 | 617 | 463 | 75% |
| **OTHER INCOME (EXPENSE)** |  |  |  |  |
| Interest income | 56 | 73 | (17) | (23)% |
| Interest expense, net | (276) | (186) | (90) | 48% |
| Gain (loss) on interest rate swaps | (192) | 374 | (566) | (151)% |
| Loss on financing transactions | — | (5) | 5 | (100)% |
| Total other income (expense) | (412) | 256 | (668) | (261)% |
| **INCOME BEFORE INCOME TAX EXPENSE** | 668 | 873 | (205) | (23)% |
| Income tax expense | 151 | 175 | (24) | (14)% |
| **NET INCOME** | 517 | 698 | (181) | (26)% |
| Less: Net income attributable to redeemable stock of subsidiary | 38 | 35 | 3 | 9% |
| Less: Net income attributable to non-controlling interests | 15 | 15 | — | —% |
| Less: Dividends on VGLNG Series A Preferred Shares | 68 | — | 68 | NM |
| **NET INCOME ATTRIBUTABLE TO COMMON STOCKHOLDERS** | $396 | $648 | $(252) | (39)% |

NM Percentage not meaningful.

### Revenue

Revenue was $2.9 billion for the three months ended March 31, 2025, a $1.5 billion, or 105%, increase from $1.4 billion for the three months ended March 31, 2024. This increase was primarily due to $1.1 billion from higher LNG sales volumes at the Plaquemines Project, partially offset by lower volumes at the Calcasieu Project due to ongoing rectification work, and an increase of $380 million due to higher LNG sales prices. All of the Calcasieu Project facility assets and a portion of the Plaquemines Project facility assets were in service from an accounting perspective and generating revenue for the three months ended March 31, 2025, as compared to only the Calcasieu Project facility assets being in service from an accounting perspective and therefore generating revenue for the three months ended March 31, 2024. The proceeds attributable to test LNG sales generated prior to the Plaquemines Project facilities being in service from an accounting perspective, and therefore recognized as an adjustment to construction in progress and not as revenue, were $38 million for the three months ended March 31, 2025.

### Operating Expense

#### Cost of Sales

Cost of sales was $1.1 billion for the three months ended March 31, 2025, a $694 million, or 190%, increase from $365 million for the three months ended March 31, 2024. This increase was due to $411 million from higher LNG sales volumes at the Plaquemines Project, partially offset by lower volumes at the Calcasieu Project due to ongoing rectification work, an increase of $243 million from higher natural gas prices, and a $38 million unfavorable change in the fair value of our natural gas supply contracts. All of the Calcasieu Project facility and a portion of the Plaquemines facility assets were in service from an accounting perspective and incurring cost of sales for the three months ended March 31, 2025, as compared to only the Calcasieu Project being in service from an accounting perspective for the three months ended March 31, 2024. The costs attributable to the production of test LNG sales incurred prior to the Plaquemines Project facilities being in service from an accounting perspective, and therefore recognized as an adjustment to construction in progress and not as cost of sales, was $16 million for the three months ended March 31, 2025.

#### Operating and Maintenance Expense

Operating and maintenance expense was $252 million for the three months ended March 31, 2025, a $143 million, or 131%, increase from $109 million for the three months ended March 31, 2024. This increase was primarily due to higher operating costs of $48 million in support of LNG production at the Plaquemines Project primarily due to an increase in non-capitalizable personnel costs, commissioning work, and operational insurance costs, $49 million in operating costs primarily for our LNG tankers with no corresponding costs in 2024, and $44 million of higher operating costs at the Calcasieu Project primarily to support ongoing commissioning and remediation work and legal costs.

#### General and Administrative Expense

General and administrative expense was $105 million for the three months ended March 31, 2025, a $33 million, or 46%, increase from $72 million for the three months ended March 31, 2024. This increase was primarily due to increased personnel costs of $23 million due to an increase in employee headcount and project milestone bonuses.

#### Development Expense

Development expense was $182 million for the three months ended March 31, 2025, a $1 million, or 1%, increase from $181 million for the three months ended March 31, 2024.

#### Depreciation and Amortization

Depreciation and amortization was $216 million for the three months ended March 31, 2025, a $146 million, or 209%, increase from $70 million for the three months ended March 31, 2024. This increase was primarily due to $15.8 billion of property, plant and equipment at the Plaquemines Project being in service from an accounting perspective as of March 31, 2025, compared to no Plaquemines Project assets being in service from an accounting perspective as of March 31, 2024.

### Income from Operations

Income from operations was $1.1 billion for the three months ended March 31, 2025, a $463 million, or 75%, increase from $617 million for the three months ended March 31, 2024. This increase was primarily a result of higher sales volumes at the Plaquemines Project and higher weighted average prices of LNG partially offset by higher cost of feed gas, depreciation, and operating and maintenance expense.

### Other Income or Expense

#### Interest Income

Interest income was $56 million for the three months ended March 31, 2025, a $17 million, or 23%, decrease from $73 million for the three months ended March 31, 2024. This decrease was primarily due to lower interest rates and lower average cash balances at corporate during the three months ended March 31, 2025, compared to the three months ended March 31, 2024.

#### Interest Expense, Net

Interest expense, net was $276 million for the three months ended March 31, 2025, a $90 million, or 48%, increase from $186 million for the three months ended March 31, 2024. This increase was primarily due to higher interest costs associated with increased debt outstanding at the Plaquemines Project and corporate. These increases were partially offset by lower commitment fees at the Plaquemines Project.

#### Gain (loss) on Interest Rate Swaps

Loss on interest rate swaps was $192 million for the three months ended March 31, 2025, a $566 million, or 151%, decrease from a gain on interest rate swaps of $374 million for the three months ended March 31, 2024. This decrease was primarily due to an unfavorable change of $540 million on the Plaquemines Project interest rate swaps, due to a decrease in the forward interest rate curves, and an unfavorable change of $26 million on the Calcasieu Project interest rate swaps, due to a decrease in the forward interest rate curves over lower notional amounts for the three months ended March 31, 2025, compared to the three months ended March 31, 2024.

#### Loss on Financing Transactions

Loss on financing transactions was nil for the three months ended March 31, 2025, a $5 million decrease from $5 million for the three months ended March 31, 2024. This decrease was due to the write-off of debt issuance costs associated with the partial prepayment of the PL Holdings Credit Facility during the three months ended March 31, 2024, with no corresponding activity for the three months ended March 31, 2025.

### Income before Income Tax Expense

Income before income tax expense was $668 million for the three months ended March 31, 2025, a $205 million, or 23%, decrease from $873 million for the three months ended March 31, 2024. This decrease was primarily a result of an unfavorable change in interest rate swaps, partially offset by an increase in income from operations primarily resulting from higher sales volumes at the Plaquemines Project and higher weighted average prices of LNG, partially offset by higher cost of feed gas, depreciation, and operating and maintenance expense as discussed above.

#### Income Tax Expense

Income tax expense was $151 million for the three months ended March 31, 2025, a $24 million, or 14%, decrease from $175 million for the three months ended March 31, 2024. Our effective tax rate was 22.6% for the three months ended March 31, 2025 compared to 20.0% for the three months ended March 31, 2024. The 2025 effective tax rate was impacted by non-deductible expenses, and changes in the valuation allowance against certain deferred tax assets.

### Net Income

Net income was $517 million for the three months ended March 31, 2025, a $181 million, or 26%, decrease from $698 million for the three months ended March 31, 2024. This decrease was primarily a result of an unfavorable change in interest rate swaps, higher cost of sales, depreciation, and operating and maintenance expense partially offset by higher revenue due to increased sales volumes and prices as discussed above.

#### Net Income Attributable to Redeemable Stock of Subsidiary

Net income attributable to redeemable stock of subsidiary was $38 million for the three months ended March 31, 2025, a $3 million, or 9%, increase from $35 million for the three months ended March 31, 2024. This increase was due to 2025 paid-in-kind distributions on the CP Funding Redeemable Preferred Units.

#### Net Income Attributable to Non-controlling Interests

Net income attributable to non-controlling interests was $15 million for the three months ended March 31, 2025 and 2024.

#### Dividends on VGLNG Series A Preferred Shares

Dividends on VGLNG Series A Preferred Shares were $68 million for the three months ended March 31, 2025. This increase was due to the September 2024 issuance of the VGLNG Series A Preferred Shares and the corresponding accumulation of dividends. There was no similar activity during the three months ended March 31, 2024.

### Net Income Attributable to Common Stockholders

Net income attributable to common stockholders was $396 million for the three months ended March 31, 2025, a $252 million, or 39%, decrease from $648 million for the three months ended March 31, 2024, due to the changes discussed above.

### Segment Results of Operations

We have four reportable segments, which consist of the Calcasieu Project, the Plaquemines Project, the CP2 Project, and the DS&S business. Each LNG project includes activity of both the respective liquefaction and export terminal and the associated pipeline facilities that will supply the natural gas to that export terminal. The DS&S business is engaged in the sale and delivery of LNG to our customers and includes the operating costs associated with our fleet of LNG tankers. Activities relating to certain development stage projects, overhead costs not directly associated with our reportable segments (for example, general and administrative and marketing expenses), and inter-segment eliminations are not material and therefore are included in corporate, other and eliminations. Prior to the three months ended March 31, 2025, we had three reportable segments, which consisted of the Calcasieu Project, the Plaquemines Project and the CP2 Project. Prior period presentations have been recast to conform to the current segment reporting structure.

### Three months ended March 31, 2025 compared to three months ended March 31, 2024

The following table shows a summary of our segment income (loss) from operations for the periods indicated:

|  | Three months ended March 31, 2025 | 2024 | Change ($) | (%) |
| --- | ---: | ---: | ---: | ---: |
| Calcasieu Project | $902 | $894 | $8 | 1% |
| Plaquemines Project | 415 | (56) | 471 | NM |
| CP2 Project | (163) | (152) | (11) | 7% |
| DS&S | 32 | (5) | 37 | NM |
| Corporate, other and eliminations(1) | (106) | (64) | (42) | 66% |
| Total | $1,080 | $617 | $463 | 75% |

(1) Includes costs associated with the CP3 Project, the Delta Project, our pipeline development projects and certain corporate activities.

NM Percentage not meaningful.

#### Calcasieu Project

For the three months ended March 31, 2025, the Calcasieu Project had income from operations of $902 million, a $8 million, or 1%, increase from $894 million for the three months ended March 31, 2024.

This increase was primarily due to:

- an increase in revenue of $223 million primarily due to an increase in LNG sales prices of $380 million, partially offset by a reduction in sales volume due to ongoing commissioning and remediation work of $157 million during the three months ended March 31, 2025.

This net favorable change was partially offset by:

- an increase in cost of sales of $171 million due to an increase in the average cost of natural gas of $200 million, partially offset by a reduction in LNG sales volumes of $38 million; and
- an increase in operating and maintenance expense of $44 million, primarily due to higher operating costs to support ongoing commissioning and remediation work, and legal costs.

#### Plaquemines Project

For the three months ended March 31, 2025, the Plaquemines Project had income from operations of $415 million, a $471 million increase from a loss from operations of $56 million for the three months ended March 31, 2024.

This increase was primarily due to:

- an increase in revenue of $1.2 billion due to the sale of LNG produced by the Plaquemines Project compared to no revenue for the corresponding period in 2024.

This net favorable change was partially offset by:

- an increase in cost of sales of $540 million, due to the sale of LNG produced by the Plaquemines Project compared to no cost of sales for the comparative period in 2024;
- an increase in depreciation and amortization expense of $131 million from placing $15.8 billion of the facility's assets in service from an accounting perspective in December 2024 and the first quarter of 2025; and
- an increase in operating and maintenance expense of $48 million primarily due to higher operating costs in support of LNG production including higher non-capitalizable personnel costs, commissioning work, and operational insurance costs.

#### CP2 Project

For the three months ended March 31, 2025, the CP2 Project had a loss from operations of $163 million, an $11 million, or 7%, increase from $152 million for the three months ended March 31, 2024. This increase was primarily driven by an increase in general and administrative expense of $9 million due to higher milestone bonuses and the cost of other administrative services.

#### DS&S

For the three months ended March 31, 2025, DS&S had income from operations of $32 million, a $37 million increase from a loss from operations of $5 million for the three months ended March 31, 2024.

This increase was primarily due to:

- revenue of $481 million generated from the sale of delivered LNG produced by our Plaquemines Project and our Calcasieu Project by DS&S with no corresponding revenue in 2024.

This net favorable change was partially offset by:

- cost of sales of $392 million, primarily due to the cost of delivered LNG purchased from our Plaquemines Project and Calcasieu Project by DS&S with no corresponding cost of sales in 2024; and
- operating and maintenance expense of $49 million, primarily due to operating costs for our LNG tankers with no corresponding costs in 2024.

#### Corporate, other and eliminations

For the three months ended March 31, 2025, corporate, other and eliminations had a loss from operations of $106 million, a $42 million, or 66%, increase from $64 million for the three months ended March 31, 2024.

This increase was primarily due to:

- an increase in corporate loss from operations of $26 million primarily due to higher general and administrative expenses for increased personnel costs associated with an increase in employee headcount; and
- an increase in inter-segment eliminations of $19 million, which includes intercompany DS&S sales of LNG purchased from the Calcasieu Project and the Plaquemines Project.

### Liquidity and Capital Resources

### General

We have been generating proceeds from the sale of LNG at the Calcasieu Project since the first quarter of 2022 and at the Plaquemines Project since January 2025. We may incur significant costs as we continue to develop our existing and other potential natural gas liquefaction and export projects, pipeline infrastructure projects, and other complementary gas transportation projects and activities.

### Sources and Uses of Cash

We expect to meet our short-term cash requirements using operating cash flows and available liquidity, consisting of cash and cash equivalents, restricted cash and available borrowing capacity under our existing credit facilities. Additionally, we expect to meet our long-term cash requirements by using operating cash flows and other future potential sources of liquidity, which may include debt and equity offerings by us or our subsidiaries.

The following table provides a summary of our cash and available borrowing capacity under existing credit facilities as of March 31, 2025:

|  | March 31, 2025 |
| --- | ---: |
| Cash and cash equivalents | $3,605 |
| Restricted cash | 429 |
| Available borrowing capacity under our credit facilities(1): |  |
| Calcasieu Pass Working Capital Facility | 247 |
| Plaquemines Working Capital Facility | 485 |
| Total available borrowing capacity under our credit facilities | 732 |
| Total cash and available borrowing capacity | $4,766 |

(1) Available borrowing capacity represents total borrowing capacity less outstanding borrowings and letters of credit under each of our credit facilities as of March 31, 2025.

On April 15, 2025, the Calcasieu Project declared COD. Following COD of the Calcasieu Project and the final distribution of the net proceeds from sales under LNG Commissioning Sales Agreements, but prior to August 19, 2027, no distributions of available cash will be permitted from Calcasieu Funding to VGLNG until any accumulated accrued distributions on the CP Funding Redeemable Preferred Units have been fully settled in cash. Further, on and after August 19, 2027, no distributions of available cash will be permitted from Calcasieu Funding to VGLNG until the CP Funding Redeemable Preferred Units have been fully redeemed in cash. In this context, available cash means funds in excess of cash deemed necessary by management to fund Calcasieu Pass's operating costs, including debt service requirements, during this period. As of March 31, 2025, the CP Funding Redeemable Preferred Units had a redemption value of $1.6 billion of which $667 million was related to accrued distributions. For the risk factors related to our business, see Item 1.—*Business* and Item 1A.— *Risk Factor*s on our 2024 Form 10-K.

We commence production at our LNG projects on a sequential basis, with each liquefaction train being brought online as it is commissioned. During the three months ended March 31, 2025, the Calcasieu Project and the Plaquemines Project generated $852 million and $564 million of cash flow from operations, respectively.

### Cash Flows

### Three months ended March 31, 2025 compared to three months ended March 31, 2024

The following table shows a summary of our condensed consolidated cash flows for the periods indicated:

|  | Three months ended March 31, 2025 | 2024 | Change ($) | (%) |
| --- | ---: | ---: | ---: | ---: |
| Net cash from operating activities | $1,114 | $638 | $476 | 75% |
| Net cash used by investing activities | (3,470) | (3,140) | (330) | 11% |
| Net cash from financing activities | 1,776 | 1,718 | 58 | 3% |

#### Operating activities

Net cash from operating activities for the three months ended March 31, 2025 was $1.1 billion, a $476 million, or 75%, increase from $638 million for the three months ended March 31, 2024. The net increase in cash inflows was primarily due to:

- an increase of $1.2 billion of cash received for the sale of LNG.

This increase in net cash inflows from operating activities was partially offset by:

- an increase of $301 million of cash paid for costs of sales, primarily for the purchase of natural gas;
- an increase of $240 million of cash paid for operating expenses; and
- an increase of $129 million of cash paid for interest expense.

#### Investing activities

Net cash used by investing activities for the three months ended March 31, 2025 was $3.5 billion, a $330 million, or 11%, increase from $3.1 billion for the three months ended March 31, 2024. The net increase in cash outflows was primarily due to:

- an increase in purchases of property, plant and equipment of $468 million primarily related to:
- an increase in cash paid at corporate of $258 million, primarily for our pipeline projects;
- an increase in cash paid for construction of $127 million at the Plaquemines Project; and
- an increase in cash paid for construction of LNG tankers of $74 million for our DS&S business.

#### Financing activities

Net cash from financing activities for the three months ended March 31, 2025 was $1.8 billion, a $58 million, or 3%, increase from $1.7 billion for the three months ended March 31, 2024. The net increase in cash inflows was primarily due to:

- proceeds from the issuance of Class A Common Stock of $1.8 billion in connection with our IPO in January 2025, with no similar activity during the same period in 2024;
- a decrease in debt principal payments of $181 million primarily due to the prepayment of $184 million of the PL Holdings Credit Facility during the three months ended March 31, 2024.

These net increases to cash inflows were partially offset by:

- a decrease in proceeds from project credit facilities of $1.8 billion due to proceeds from the Plaquemines Credit Facilities of $383 million for the three months ended March 31, 2025, as compared to proceeds of $2.2 billion for the same period in 2024;
- dividend payments and distributions of $175 million in 2025 with no corresponding activity in 2024 for:
- $135 million of dividends paid on the VGLNG Series A Preferred Shares; and
- $40 million of dividends paid on the Company's outstanding common stock.

### VGLNG Information

There are no material differences between the financial information presented on this Form 10-Q and VGLNG's financial information other than (i) certain presentational differences related to the accounting for the VGLNG Series A Preferred Shares, and (ii) stockholders’ equity of Venture Global, including the Class A and Class B common stock and any dividends payable thereon.

### Key Trends and Uncertainties

During 2025 and beyond, we expect to face the following uncertainties related to our business. Management expects that, in the near term, growth from increased LNG production volumes and associated revenues, as construction and commissioning progresses at the Plaquemines Project, may lessen or offset these uncertainties. If this does not occur, or if the challenges described below or elsewhere impact us to a greater degree than we currently anticipate, it may have a material impact on our financial condition, results of operations and/or cash flows. We continue to monitor our operations and address challenges as they arise. For the risk factors related to our business, see Item 1.—*Business* and Item 1A.— *Risk Factor*s on our 2024 Form 10-K.

### Macroeconomic

General macroeconomic uncertainty may result in conditions that could exacerbate some of the risks that affect our business. This includes evolving tariff structures and any potential impact on global economic activity, potential labor shortages, heightened inflation, capital market volatility, and exchange rate and interest rate fluctuations.

*Tariffs —* The global trade landscape is currently highly volatile. Various countries have announced plans for and/or have already implemented new or modified tariffs. On April 2, 2025, the United States announced broad reciprocal tariffs on imports from all countries. This included a 10% baseline tariff and higher country-specific tariffs. This resulted in other countries announcing additional retaliatory tariffs or plans for retaliatory tariffs. Global economic uncertainty and any related reduction in economic activity or capital investment may slow growth in global GDP or lead to global recession, potentially resulting in reduced demand for LNG. Accordingly, these tariffs and any retaliatory actions from other countries could have a material impact on our financial condition, results of operations and/or cash flows through reduced demand and competitiveness for both our long term and short term contract sales in countries that may be affected by those policies, and increased project costs for future imported equipment and materials. The Company continues to monitor this dynamic situation.

*Labor market —* A recent shortage in the labor pool of skilled workers to construct LNG facilities and other major infrastructure projects could make it more difficult to attract and retain qualified personnel for future projects. In addition, competition for skilled labor from other LNG projects under development in Louisiana could exacerbate this shortage, potentially increasing labor retention costs. This could materially increase our estimated project costs, which include significant labor costs, and could have a material impact on our financial condition, results of operations and/or cash flows.

*Capital markets and interest rates —* Capital markets have experienced recent volatility and liquidity constraints due to uncertainty around the global economic impact of tariffs and inflation. Such volatility may adversely impact access to the market for corporate or project lending or lead to higher borrowing costs. Inflationary concerns could lead the Federal Reserve to raise interest rates, which could also increase our cost of borrowing. We aim to mitigate our exposure to interest rate volatility through interest rate swaps, but we will not be able to mitigate all interest rate risk.

### Geopolitical

The future geopolitical environment is uncertain. Changes in the geopolitical environment could affect the demand and market prices for our products. This includes reduced demand globally for LNG should geopolitical uncertainty result in reduced global trade and economic activity, increased competition in European markets from the potential reintroduction of Russian sourced natural gas, trade negotiations with customers in politically sensitive regions, potential selective sourcing of LNG by the People's Republic of China, and other potential implications. The Company continues to monitor the impact these trends and uncertainties could have on our financial condition, results of operations and/or cash flows.

### Regulatory

Recent shifts in U.S. environmental and energy policy have resulted in increased opportunities to continue the development of our various projects. This includes the DOE lifting its pause on new authorizations to export LNG to non-FTA nations, the DOE's conditional approval of the CP2 Project in March 2025, and continued progress of the CP2 Project with the FERC. While we cannot predict whether these trends will continue or whether our applications, approvals or permits will attract significant opposition in the permitting processes, we intend to continue to progress our projects through the various permitting and regulatory channels over their expected timelines. Any future significant changes in this trend could have a material impact on our financial condition, results of operations and/or cash flows.

### Post-COD SPAs

The Calcasieu Project is involved in disputes and arbitration proceedings with certain of its post-COD SPA customers. Such customers are asserting, among other claims, that the Calcasieu Project is delayed in achieving COD under our post-COD SPAs. The remedies sought by these customers include damages ranging between $6.7 billion and $7.4 billion (which is potentially subject to increase with the passage of time until COD occurs), rather than the termination of the post-COD SPA. These disputes are subject to the relevant seller aggregate liability cap of approximately $1.6 billion under the relevant post-COD SPAs. Certain of these customers are also disputing whether the liability limitations in the Calcasieu Project's post-COD SPAs are applicable, and therefore are claiming damages, including amounts in excess of the liability limitations. For further discussion, see Item 1A.—*Risk Factors—Risks Relating to Regulation and Litigation—If we are unsuccessful in any current or potential future arbitration proceedings with customers, the amounts that we are required to pay may be substantial or certain of our post-COD SPAs may be terminated, which may lead to an acceleration of all our debt for the relevant project* on our 2024 Form 10-K.

### Critical Accounting Estimates

### Use of Estimates

The preparation of the condensed consolidated financial statements in conformity with GAAP requires management to make estimates and assumptions that affect the amounts reported in the condensed consolidated financial statements and accompanying notes. We evaluate our assumptions on an ongoing basis. While we believe the estimates used in the preparation of the condensed consolidated financial statements are appropriate, actual results could differ from these estimates.

### Recent Accounting Pronouncements

For a summary of recent accounting pronouncements, see *Note 20 – Recent Accounting Pronouncements* in Item 1.—*Financial Statements* on this Form 10-Q.

## Controls and procedures

As filed, 996 characters.

### Evaluation of Disclosure Controls and Procedures

Our disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) are designed to ensure that information required to be disclosed by us in reports we file or submit under the Securities Exchange Act of 1934, as amended, is recorded, processed, summarized and reported within the appropriate time periods, and that such information is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely discussions regarding required disclosure.

We, under the supervision of and with participation of our management, including our Chief Executive Officer and Chief Financial Officer, have evaluated the effectiveness of our disclosure controls and procedures. Based on that evaluation, our Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures were effective as of March 31, 2025.

Filed May 13, 2025.
Source: SEC EDGAR, the filing index for accession 0002007855-25-000018. Last ingested by Listed: Nov 14, 2026, 23:30 ET. No prices; not investment advice.